WorldWideScience

Sample records for service area licenses

  1. 47 CFR 22.228 - Cellular rural service area licenses subject to competitive bidding.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Cellular rural service area licenses subject to... Procedures § 22.228 Cellular rural service area licenses subject to competitive bidding. Mutually exclusive initial applications for Cellular Rural Service Area licenses are subject to competitive bidding. The...

  2. 47 CFR 22.960 - Cellular unserved area radiotelephone licenses subject to competitive bidding.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Cellular unserved area radiotelephone licenses... (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Cellular Radiotelephone Service § 22.960 Cellular... applications for cellular unserved area Phase I and Phase II licenses filed after July 26, 1993 are subject to...

  3. Technology Licensing Strategy for Network Product in a Service Industry

    Directory of Open Access Journals (Sweden)

    Xianpei Hong

    2015-01-01

    Full Text Available Technology licensing has gained significant attention in literature and practice as a rapid and effective way to improve firm’s capability of technology innovation. In this paper, we investigate a duopolistic service provider competition market, where service providers develop and sell a kind of network product. In this setting, we analyze the innovating service provider’s four licensing strategies: no licensing, fixed fee licensing, royalty licensing, and two-part tariff licensing. The literature suggests that when the network products can be completely substituted, two-part tariff licensing is the optimal strategy of the innovating service provider. We find that when the network products cannot be completely substituted, two-part tariff licensing is not always optimal. The degree of the product differentiation, the intensity of the network effects, and the R&D cost of the potential licensee play a key role in determining the innovating service provider’s optimal licensing strategies.

  4. 47 CFR 27.1208 - BTA service areas.

    Science.gov (United States)

    2010-10-01

    .... Except for incumbent BRS licenses, BRS service areas are Basic Trading Areas (BTAs) or additional service... in places where Rand McNally has not defined BTAs: American Samoa; Guam; Gulf of Mexico Zone A; Gulf of Mexico Zone B; Gulf of Mexico Zone C; Northern Mariana Islands; Mayaguez/Aguadilla-Ponce, Puerto...

  5. Application of IC Card License for Road Transportation in Commercial Vehicles Supervision and Service

    Directory of Open Access Journals (Sweden)

    Li Weiwei

    2016-01-01

    Full Text Available IC card electronic license for road transport includes the IC card commercial vehicle’s certificate and IC card practitioner’s qualification certificate. In China, the IC card electronic license for road transport is the electronic ID card which must be carried by each commercial vehicles and practitioners. This paper briefly introduces the basic situation, data format and security keys architecture of IC card electronic license for road transportation of China. In order to strengthen the supervision and service of commercial vehicles, this paper puts forward the overall application framework of IC card electronic license for road transport. The application examples of IC card license in the supervision of passenger station, dangerous goods transport management, governance overload and logistics park and port area management are discussed. The practical application results show that the application of IC card electronic license for road transport is an important technical means to improve the supervision ability and service quality of the road transportation industry.

  6. 77 FR 15665 - Cellular Service, Including Changes in Licensing of Unserved Area; Interim Restrictions and...

    Science.gov (United States)

    2012-03-16

    ... groups and women are given the opportunity to participate in the provision of spectrum-based services... members of minority groups and women.'' One of the principal means by which the Commission fulfills these... definitions for auctions of these licenses. We seek comment on whether we should define an entrepreneur as an...

  7. Spatial service delivery system for smart licensing & enforcement management

    Science.gov (United States)

    Wahap, N. A.; Ismail, N. M.; Nor, N. M.; Ahmad, N.; Omar, M. F.; Termizi, A. A. A.; Zainal, D.; Noordin, N. M.; Mansor, S.

    2016-06-01

    Spatial information has introduced a new sense of urgency for a better understanding of the public needs in term of what, when and where they need services and through which devices, platform or physical locations they need them. The objective of this project is to value- add existing license management process for business premises which comes under the responsibility of Local Authority (PBT). Manipulation of geospatial and tracing technology via mobile platform allows enforcement officers to work in real-time, use a standardized system, improve service delivery, and optimize operation management. This paper will augment the scope and capabilities of proposed concept namely, Smart Licensing/Enforcement Management (SLEm). It will review the current licensing and enforcement practice of selected PBT in comparison to the enhanced method. As a result, the new enhanced system is expected to offer a total solution for licensing/enforcement management whilst increasing efficiency and transparency for smart city management and governance.

  8. 47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing provisions for the Direct Broadcast Satellite Service. 25.148 Section 25.148 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148...

  9. 47 CFR 25.142 - Licensing provisions for the non-voice, non-geostationary mobile-satellite service.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing provisions for the non-voice, non-geostationary mobile-satellite service. 25.142 Section 25.142 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space...

  10. 76 FR 11523 - Atomic Safety and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility...

    Science.gov (United States)

    2011-03-02

    ... and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility); Notice of... Governmental Entities Regarding Environmental Portion of Enrichment Facility Licensing Proceeding February 24.... White. In this 10 CFR part 70 proceeding regarding the request of applicant AREVA Enrichment Services...

  11. The Performance of Forestry Human Resources in Licensing Forest Utilization, The Lease of Forest Area, and The Release of Forest Area

    Directory of Open Access Journals (Sweden)

    Nurtjahjawilasa

    2015-08-01

    Full Text Available Performance assesment includes the quantity and quality measurements of individual or group works within organization in carrying out duties and functions. It is based on norms, standard operational procedure (SOP, and specified criteria in an organization. Factors affecting quality and quantity of individual performance in an organization are skills, experience, ability, competence, willingness, energy, technology, leadership, compensation, clarity of purpose, and security. This study aims to identify and analyze the performance of forestry human resources (HR related to licensing forest utilization, releasing forest area, and leasing forest area. The results of the study are: (1 the performance of forestry HR in licensing forest utilization was relatively still poor; (2 the structure (rules, norms, cultural cognitive of forestry HR was unclear and is not well developed; and (3 the culture of learning organization, including personal mastery, mental models, shared vision, team learning, and system thinking is still insufficient and needs to be developed at the ministerial, provincial, and district/city levels. Some suggestions for improving the performance of forestry HR are: (1 establishing an appraisal team/task force of forestry HR performance; (2 developing commitment for high quality service at the bureaucratic elites and their highest level networks; and (3 considering the development of one stop licensing supported by online system to promote transparency and public accountability.

  12. 47 CFR 25.144 - Licensing provisions for the 2.3 GHz satellite digital audio radio service.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing provisions for the 2.3 GHz satellite digital audio radio service. 25.144 Section 25.144 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25...

  13. MARSSIM guidelines for non-impacted area identification in support of partial site release prior to license termination

    International Nuclear Information System (INIS)

    Parish, D.

    1999-01-01

    Regulations are in place which allow plants undergoing decommissioning to remove obsolete requirements from their licenses. Large buffer areas to the site boundary, needed for emergency planning purposes during power operation, are not required for permanently defueled facilities. It is important that non-impacted areas be removed from license restrictions as soon as possible post shutdown to allow rapid asset recovery and return the large environmental resources these areas represent to beneficial use. License termination surveys are not required for non-impacted areas in accordance with the guidance of US Nuclear Regulatory Commission (NRC) NUREG-1575 (MARSSIM), and NRC Draft Regulatory Guide DG-4006. Thus, such areas do not fall under the license termination requirements of 10CFR50.82 (US Code of Federal Regulations). This report describes methods of classifying areas as non-impacted in accordance with MARRSIM and other NRC guidance, and the licensing options for release of non-impacted areas prior to license termination. The status of Big Rock Point's efforts toward early release of non-impacted areas also is provided. (author)

  14. 47 CFR 22.949 - Unserved area licensing process.

    Science.gov (United States)

    2010-10-01

    ..., the licensee in the adjacent market (on the requested channel block) has the right to enter into such... sets forth the process for licensing unserved areas in cellular markets on channel blocks for which the... file competing applications for authority to operate a new cellular system in or to expand an existing...

  15. 47 CFR 25.145 - Licensing conditions for the Fixed-Satellite Service in the 20/30 GHz bands.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing conditions for the Fixed-Satellite Service in the 20/30 GHz bands. 25.145 Section 25.145 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25...

  16. Reactor coolant pump service life evaluation for current life cycle optimization and license renewal

    International Nuclear Information System (INIS)

    Doroshuk, B.W.; Berto, D.S.; Robles, M.

    1990-01-01

    This paper reports that as part of the plant life cycle management and license renewal program, Baltimore Gas and Electric Company (BG and E) has completed a service life evaluation of their reactor coolant pumps, funded jointly by EPRI and performed by ABB Combustion Engineering Nuclear Power. Two of the goals of the BG and E plant life cycle management and license renewal program, and of this current evaluation, are to identify actions which would optimize current plant operation, and ensure that license renewal remains a viable option. The reactor coolant pumps (RCPs) at BG and E's Calvert Cliffs Units 1 and 2 are Byron Jackson pumps with a diffuser and a single suction. This pump design is also used in many other nuclear plants. The RCP service life evaluation assessed the effect of all plausible age-related degradation mechanisms (ARDMs) on the RCP components. Cyclic fatigue and thermal embrittlement were two ARDMs identified as having a high potential to limit the service life of the pump case. The pump case is a primary pressure boundary component. Hence, ensuring its continued structural integrity is important

  17. Water Service Areas - Public Water Supplier's (PWS) Service Areas

    Data.gov (United States)

    NSGIC Education | GIS Inventory — Boundaries of current public water supplier's (PWS) service areas. This data set contains the present service area boundary of the water system and does not contain...

  18. 75 FR 16869 - Areva Enrichment Services, LLC; Establishment of Atomic Safety and Licensing Board

    Science.gov (United States)

    2010-04-02

    ... Enrichment Services, LLC; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by the... following proceeding: Areva Enrichment Services, LLC (Eagle Rock Enrichment Facility) This Board is being established pursuant to a Notice of Hearing and Commission Order regarding the application of Areva Enrichment...

  19. The developing one door licensing service system based on RESTful oriented services and MVC framework

    Science.gov (United States)

    Widiyanto, Sigit; Setyawan, Aris Budi; Tarigan, Avinanta; Sussanto, Herry

    2016-02-01

    The increase of the number of business impact on the increasing service requirements for companies and Small Medium Enterprises (SMEs) in submitting their license request. The service system that is needed must be able to accommodate a large number of documents, various institutions, and time limitations of applicant. In addition, it is also required distributed applications which is able to be integrated each other. Service oriented application fits perfectly developed along client-server application which has been developed by the Government to digitalize submitted data. RESTful architecture and MVC framework are embedded in developing application. As a result, the application proves its capability in solving security, transaction speed, and data accuracy issues.

  20. 47 CFR 25.143 - Licensing provisions for the 1.6/2.4 GHz mobile-satellite service and 2 GHz mobile-satellite...

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing provisions for the 1.6/2.4 GHz mobile-satellite service and 2 GHz mobile-satellite service. 25.143 Section 25.143 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses...

  1. 22 CFR 96.30 - State licensing.

    Science.gov (United States)

    2010-04-01

    ... Licensing and Corporate Governance § 96.30 State licensing. (a) The agency or person is properly licensed or... person follows applicable State licensing and regulatory requirements in all jurisdictions in which it provides adoption services. (c) If it provides adoption services in a State in which it is not itself...

  2. 42 CFR 431.710 - Provisional licenses.

    Science.gov (United States)

    2010-10-01

    ... Licensing Nursing Home Administrators § 431.710 Provisional licenses. To fill a position of nursing home... 42 Public Health 4 2010-10-01 2010-10-01 false Provisional licenses. 431.710 Section 431.710 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  3. 78 FR 1166 - Service Rules for the Advanced Wireless Services in the H Block-Implementing Section 6401 of the...

    Science.gov (United States)

    2013-01-08

    .... We see no reason to diverge from the reasoning in the AWS Sixth Report and Order. Accordingly, we... alternative proposal. 2. Service Area 19. Geographic Area Licensing: We propose to adopt a geographic area... would likely be deployed in these bands. Additionally, geographic-area licensing is consistent with the...

  4. Radiopharmaceutical licensing

    International Nuclear Information System (INIS)

    Mather, S.J.

    1992-01-01

    Recent health service legislation, and especially the loss of crown immunity has once again focussed attention on the arrangements for licensing of radiopharmaceuticals. The aim of the article is to describe in general terms the UK licensing system and in particular to provide guidance to those responsible for the supply of radiopharmaceuticals in hospitals. (author)

  5. 76 FR 53492 - South Carolina Public Service Authority (Also Referred to as Santee Cooper); Combined Licenses...

    Science.gov (United States)

    2011-08-26

    ... Carolina Public Service Authority (Also Referred to as Santee Cooper); Combined Licenses for Virgil C... as Santee Cooper), for two Title 10 of the Code of Federal Regulations (10 CFR) part 52 combined... Service Authority (Also Referred to as Santee Cooper) Application for the Virgil C. Summer Nuclear Station...

  6. Water Service Areas - MDC_WaterServiceArea

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — The Water and Sewer Service Area layer was derived from the original paper based sketches which contained both water and sewer utility boundary information. This...

  7. Sewerage Service Areas - MDC_SewerServiceArea

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — The Water and Sewer Service Area layer was derived from the original paper based sketches which contained both water and sewer utility boundary information. This...

  8. OUTSOURCING IN HOTEL ENTERPRİSES: AN EVALUATION ON AREAS OUTSOURCED IN LICENSED HOTEL ENTERPRİSES IN ÇEŞME

    Directory of Open Access Journals (Sweden)

    ADNAN TÜRKSOY

    2013-06-01

    Full Text Available This study aims at researching into practical applications of the approach, outsourcing, in hospitality industry,which has gradually become widespread nowadays in most hotel enterprises. The outsourcing approach is defined as the supply of the products and services by external firms and professional people rather than providing them within the company. This study aims at the determination of the areas that are outsourced in hotel enterprises. In this study, firstly, the definition of “outsourcing” has been explained. Secondly, the factors leading firms to outsourcing have been examined. Thirdly, the areas that are  outsourced have been evaluated. Lastly, the findings of the study showing how outsourcing have been applied in licensed tourism establishments in Çeşme have been explained.

  9. 76 FR 55711 - Confirmatory Order Modifying License No. SNM-2001 for the Shallow Land Disposal Area, Parks...

    Science.gov (United States)

    2011-09-08

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-8907; NRC-2011-0193] Confirmatory Order Modifying License No. SNM-2001 for the Shallow Land Disposal Area, Parks Township, Armstrong County, PA; Notice of... (SNM), pursuant to the terms and conditions of the aforementioned License, at the Shallow Land Disposal...

  10. 76 FR 7847 - Glenn A. Baxter, Application To Renew License for Amateur Radio Service Station K1MAN

    Science.gov (United States)

    2011-02-11

    ... Renew License for Amateur Radio Service Station K1MAN AGENCY: Federal Communications Commission. ACTION... Service Station K1MAN filed by Glenn A. Baxter should be granted. DATES: The document was mailed to the... Amateur Radio Station K1MAN should be granted. As discussed below, the record before us indicates that...

  11. 47 CFR 80.53 - Application for a portable ship station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable ship station license... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.53 Application for a portable ship station license. The Commission may grant a license permitting operation of a...

  12. 76 FR 387 - Atomic Safety and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility)

    Science.gov (United States)

    2011-01-04

    ... and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility) December 17, 2010... construction and operation of a gas centrifuge uranium enrichment facility--denoted as the Eagle Rock... site at http://www.nrc.gov/materials/fuel-cycle-fac/arevanc.html . These and other documents relating...

  13. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  14. 78 FR 6325 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-01-30

    .... Application Type: New NVO & OFF License. Naca Logistics (USA), Inc. dba Brennan International Transport, dba...). Application Type: New NVO & OFF License. Miami Freight & Logistics Services, Inc. (NVO & OFF), 3630 NW 76th... World Shipping, dba OWS, dba Ocean Express, dba Oceanexpress Vanguard Logistics Services, dba Vanguard...

  15. 75 FR 8703 - Auction of Lower and Upper Paging Bands Licenses Scheduled for May 25, 2010; Notice and Filing...

    Science.gov (United States)

    2010-02-25

    ... of such geographic area licensees to use certain portions of the electromagnetic spectrum or provide... of the electromagnetic spectrum or provide service to certain areas in their geographic license areas...: Wireless Telecommunications Bureau, Auctions and Spectrum Access Division: For legal questions: Scott...

  16. Challenges in the Licensing of New Nuclear Power Plant, Service Life Extension of Operating Ones (Safeguards-Safety-Security Aspects)

    International Nuclear Information System (INIS)

    Horvath, K.

    2016-01-01

    The Hungarian Atomic Energy Authority (HAEA), as the Hungarian nuclear regulator is faced with dual challenges meant by the licensing of the planned construction of two AES-2006 type nuclear power plant units and the licensing of the service life extension of the existing units that have been operating for more than 30 years. The HAEA has full regulatory competence; its mission is to oversee the safety and security of all the peaceful applications of atomic energy. Accordingly, the licensing scope covers safeguards, safety as well as security. The paper shows the current status of the Hungarian nuclear programme and the future plans, as well as summarizes the regulatory approach followed by HAEA. (author)

  17. Public Satisfaction And Quality Of Service Corner Driving License Forming Image Police

    Directory of Open Access Journals (Sweden)

    Asmara Indahingwati

    2017-03-01

    Full Text Available 46 sampling research taking care of people who are driving license (SIM in the police force aims to examine the relationship between service quality and satisfaction with the public image of the police institution. Data were collected through questionnaires and analyzed using the Likert model of multiple regression techniques. Results of hypothesis testing showed R = 0.619; F = 44.422; and p = 0.000 (p <0.05 showed that the quality of services and satisfaction of the people together influenced the image of the police. The coefficient of determination explains that the simultaneous quality of services and satisfaction of the people were able to contribute effectively to the image of the police amounted to 38.3%. The results of partial analysis shows that the relationship between service quality and image of the police has a value of p = 0.000 (p <5%, and r = 0.361, which means the quality of service to the image of the police institution is low. Partial assay analysis results between people's satisfaction with the image of the police obtained value of p = 0.000 (p <0.05; r = 0.322, which means people's satisfaction with the image of the police institutions have a significant positive correlation with the level of relationships is low

  18. 47 CFR 87.47 - Application for a portable aircraft station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable aircraft station... SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.47 Application for a portable aircraft station license. A person may apply for a portable aircraft radio station license if the need...

  19. CVP Service Area

    Data.gov (United States)

    California Natural Resource Agency — Federal Water Contract Service Area boundaries are incorporated boundaries of districts having contracts with the U.S. Bureau of Reclamation (Reclamation), within...

  20. 77 FR 59193 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-09-26

    ... Type: New OFF License. Bring Logistics US, Inc. (NVO & OFF), 4500 N. Sam Houston Parkway W., 130...: New NVO & OFF License. Contract Logistics, LLC (NVO & OFF), 4911 N. Portland Avenue, Suite 200.... Roush, Manager, Application Type: New NVO & OFF License. Crescent Line Inc. dba Globe Express Services...

  1. Health Service Areas (HSAs) - Small Area Estimates

    Science.gov (United States)

    Health Service Areas (HSAs) are a compromise between the 3000 counties and the 50 states. An HSA may be thought of as an area that is relatively self-contained with respect to hospital care and may cross over state boundries.

  2. 48 CFR 1352.239-70 - Software license addendum.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Software license addendum... Software license addendum. As prescribed in 48 CFR 1339.107, insert the following clause: Software License....S.C. Section 516). (h) Renewal of Support after Expiration of this Award: Service will not...

  3. 76 FR 70145 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-11-10

    ...). Application Type: New NVO License. Alomar Transport, Inc. (NVO & OFF), 150-30 132nd Avenue, Suite 303, Jamaica... & OFF License. Forward System Logistics Inc. (NVO), 144-54 156th Street, Jamaica, NY 11434. Officers... NVO License. Green Line Shipping & Logistics Services Inc. (NVO & OFF), 16230 Lake View Lane, Apple...

  4. The SLOWPOKE licensing model

    Energy Technology Data Exchange (ETDEWEB)

    Snell, V. G.; Takats, F.; Szivos, K.

    1989-08-15

    The SLOWPOKE Energy System (SES-10) is a 10 MW heating reactor that has been developed in Canada. It will be capable of running without a licensed operator in continuous attendance, and will be sited in urban areas. It has forgiving safety characteristics, including transient time-scales of the order of hours. A process called `up-front` licensing has been evolved in Canada to identify, and resolve, regulatory concerns early in the process. Because of the potential market in Hungary for nuclear district heating, a licensing plan has been developed that incorporates Canadian licensing experience, identifies specific Hungarian requirements, and reduces the risk of licensing delays by seeking agreement of all parties at an early stage in the program.

  5. 47 CFR 22.969 - Cellular RSA licenses subject to competitive bidding.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Cellular RSA licenses subject to competitive bidding. 22.969 Section 22.969 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Cellular Radiotelephone Service § 22.969 Cellular RSA licenses...

  6. Distribution of nuclear medicine service in Brazil

    International Nuclear Information System (INIS)

    Silva, Ana Carolina Costa da; Duarte, Alessandro; Santos, Bianca Maciel dos

    2011-01-01

    The Brazil does not posses a good distribution of nuclear medicine service por all his territory. This paper shows the difference among country regions as far the number of clinics of nuclear medicine as is concerning, and also doctors licensed in the area and radioprotection supervisors, both licensed by the Brazilian Nuclear Energy Commission (CNEN)

  7. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  8. 36 CFR 264.3 - Licensing for commercial use.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Licensing for commercial use... PROPERTY MANAGEMENT Official Forest Service Insignia § 264.3 Licensing for commercial use. (a) Each commercial license granted for the use of the insignia or likeness thereof shall contain the following terms...

  9. Estimates of population distributions and tailings areas around licensed uranium mill sites. Final report

    International Nuclear Information System (INIS)

    Hans, J.M.; Hall, J.B.; Moore, W.E.

    1986-08-01

    Population distributions and tailings areas were estimated from aerial photography for each of 21 licensed uranium millsites. Approximately 11,600 persons live within 5 kilometers of the tailings impoundments at the millsites. About 82% of these persons live near five of the millsites. No persons were found living within 5 kilometers of six of the millsites. Tailings area measurements include the surface area of tailings in impoundments, heap-leached ore, and carryover tailings in evaporation ponds. Approximately 4,000 acres of tailings surfaces were measured for the 21 millsites. About 55% of the tailings surfaces were dry, 11% wet, and the remainder ponded. The average tailings surface area for the millsites is about 200 acres and ranges from 7 to 813 acres

  10. 47 CFR 54.207 - Service areas.

    Science.gov (United States)

    2010-10-01

    ... company to be other than such company's study area, the Commission will consider that proposed definition... definition of a service area served by a rural telephone company. (2) The Commission shall issue a Public... to consider a definition of a service area served by a rural telephone company that is different from...

  11. 13 CFR 130.310 - Area of service.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Area of service. 130.310 Section 130.310 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS DEVELOPMENT CENTERS § 130.310 Area of service. The AA/SBDC shall designate in writing the Area of Service of each...

  12. Site Specific Vendor's License

    Data.gov (United States)

    Montgomery County of Maryland — This dataset contains information of a site-specific vendor's license which is required if an individual sells or offers to sell goods or services from a stationary...

  13. Cogeneration. Section 2: Products and services

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This is a directory of suppliers of products and services in the area of cogeneration. The subheadings of this directory include developers and owner operators, system packagers, manufacturers of prime movers, equipment manufacturers, instruments and controls manufacturing, consulting services, appraisal and valuation, computer services, environmental services, feasibility services, hydrology, marketing, measurements, meteorology, regulatory and licensing, research, testing, training and personnel, engineering and construction, operations and maintenance, and insurance, financial and legal services

  14. 20 CFR 628.405 - Service delivery areas.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Service delivery areas. 628.405 Section 628... TITLE II OF THE JOB TRAINING PARTNERSHIP ACT Local Service Delivery System § 628.405 Service delivery... evaluate the degree to which a proposed service delivery area meets criteria established by the Governor...

  15. 77 FR 43600 - Ocean Transportation Intermediary License Reissuances

    Science.gov (United States)

    2012-07-25

    .... License No.: 017267NF. Name: Just In Time Services, Inc. Address: 11380 NW 34th Street, Suite 100, Doral... to section 40901 of the Shipping Act of 1984 (46 U.S.C. 40101). License No.: 016201N. Name: Delta...

  16. 47 CFR 25.117 - Modification of station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Modification of station license. 25.117 Section 25.117 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses General Application Filing Requirements § 25.117...

  17. 21 CFR 515.20 - Approval of medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Approval of medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.20 Approval of medicated feed mill license applications. Within 90 days after an...

  18. 21 CFR 515.23 - Voluntary revocation of medicated feed mill license.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Voluntary revocation of medicated feed mill... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.23 Voluntary revocation of medicated feed mill license. A license issued under...

  19. 45 CFR 1321.75 - Licenses and safety.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Licenses and safety. 1321.75 Section 1321.75... AND COMMUNITY PROGRAMS ON AGING Service Requirements § 1321.75 Licenses and safety. The State shall... that the facility complies with all applicable State and local health, fire, safety, building, zoning...

  20. 76 FR 10594 - Ocean Transportation Intermediary License Revocation

    Science.gov (United States)

    2011-02-25

    ... 515, effective on the corresponding date shown below: License Number: 2739NF. Name: Alison Transport... to maintain valid bonds. License Number: 2763F. Name: Logistics & Transportation Services Inc... Mohawk Global Logistics (ROC). Address: 52 Marway Circle, Suite 1, Rochester, NY 14624. Date Revoked...

  1. 21 CFR 515.11 - Supplemental medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Supplemental medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.11 Supplemental medicated feed mill license applications. (a) After approval of a medicated feed...

  2. 76 FR 44330 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-07-25

    .... Nguyen, Secretary/CFO, Application Type: New NVO & OFF License. Atlas Logistics LLC (NVO & OFF), 2801 NW...), Application Type: New NVO & OFF License. Bulk Cargo Services & Logistics Inc. (OFF), 15400 N.E. 103rd Drive..., Member/Chief Executive Manager, (Qualifying Individual), Stina Storr, Member/ Managing Member...

  3. 78 FR 56229 - Ocean Transportation Intermediary License Revocations and Terminations

    Science.gov (United States)

    2013-09-12

    .... 40101) effective on the date shown. License No.: 004306N. Name: International Transport Services, Inc.... License No.: 020272NF. Name: CCT Corporation dba CCT Marine dba CCT Global Logistics. Address: 11250 NW... maintain valid bonds. License No.: 024023F. Name: OES Logistics, Inc Address: 10900 E. 183rd Street, 130...

  4. 42 CFR 136a.15 - Health Service Delivery Areas.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Health Service Delivery Areas. 136a.15 Section 136a... Receive Care? § 136a.15 Health Service Delivery Areas. (a) The Indian Health Service will designate and... Federal Indian reservations and areas surrounding those reservations as Health Service Delivery Areas. (b...

  5. 47 CFR 25.113 - Station licenses and launch authority.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Station licenses and launch authority. 25.113 Section 25.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses General Application Filing Requirements § 25.113 Station...

  6. 21 CFR 515.21 - Refusal to approve a medicated feed mill license application.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Refusal to approve a medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.21 Refusal to approve a medicated feed mill license application. (a) The...

  7. 21 CFR 515.24 - Notice of revocation of a medicated feed mill license.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Notice of revocation of a medicated feed mill... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.24 Notice of revocation of a medicated feed mill license. When a license...

  8. 77 FR 30530 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-05-23

    ... Individual), Application Type: New NVO License. Global Wine Logistics, Inc. (NVO & OFF), 197 Route 19 South... Hextall, President/CEO, Application Type: Add NVO Service/Trade Name Change. M & D Global Logistics, Inc... Service. Metro Freight Services, Inc. dba Maritime Express Lines (M.E.L.) (NVO & OFF), 1225 W. St. George...

  9. Environmental license process complexity in natural protected areas: case of OSBAT pipeline operated by TRANSPETRO in the state of Sao Paulo; Complexidade do licenciamento ambiental em areas naturais protegidas: caso do duto OSBAT operado pela TRANSPETRO no estado de Sao Paulo

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Anibal Jose Constantino; Raul, Vanderlei Lourenco; Martini, Andrea Dietrich; Campos, Cleber Lucio dos Santos; Ozorio, Tarcisio Faria; Melo Neto, Joao Evangelista de; Lima, Silvia Ferreira de [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    It presents the environmental license process enforced to obtain the Implementation License (LI) of the OSBAT pipeway part substitution, in the Sao Sebastiao city, State of Sao Paulo, with the analyses centered on the several public power instances and on the many special legal protection aspects around the natural area scenarios of the project interference. The license process had the duration of seventeen months, since the LI protocol and its emission. The process had the involvement of several organisms, the main part from the Sistema Nacional de Meio Ambiente - SISNAMA, and represented an interesting experience that can contribute to the agility of other license process of infrastructure works on protected natural areas, which has the incidence of an extensive legislation and activities restriction. (author)

  10. AVC/H.264 patent portfolio license

    Science.gov (United States)

    Skandalis, Dean A.

    2006-08-01

    MPEG LA, LLC offers a joint patent license for the AVC (a/k/a H.264) Standard (ISO/IEC IS 14496-10:2004). Like MPEG LA's other licenses, the AVC Patent Portfolio License is offered for the convenience of the marketplace as an alternative enabling users to access essential intellectual property owned by many patent holders under a single license rather than negotiating licenses with each of them individually. The AVC Patent Portfolio License includes essential patents owned by DAEWOO Electronics Corporation; Electronics and Telecommunications Research Institute (ETRI); France Telecom, societe anonyme; Fujitsu Limited; Hitachi, Ltd.; Koninklijke Philips Electronics N.V.; LG Electronics Inc.; Matsushita Electric Industrial Co., Ltd.; Microsoft Corporation; Mitsubishi Electric Corporation; Robert Bosch GmbH; Samsung Electronics Co., Ltd.; Sedna Patent Services, LLC; Sharp Kabushiki Kaisha; Siemens AG; Sony Corporation; The Trustees of Columbia University in the City of New York; Toshiba Corporation; UB Video Inc.; and Victor Company of Japan, Limited. Another is expected also to join as of August 1, 2006. MPEG LA's objective is to provide worldwide access to as much AVC essential intellectual property as possible for the benefit of AVC users. Therefore, any party that believes it has essential patents is welcome to submit them for evaluation of their essentiality and inclusion in the License if found essential.

  11. The Application Study in Solar Energy Technology for Highway Service Area: A Case Study of West Lushan Highway Low-Carbon Service Area in China

    Directory of Open Access Journals (Sweden)

    Xiaochun Qin

    2015-01-01

    Full Text Available A lot of research works have been made concerning highway service area or solar technology and acquired great achievements. However, unfortunately, few works have been made combining the two topics together of highway service areas and solar energy saving to make a systemic research on solar technology application for highway service area. In this paper, taking West Lushan highway low-carbon service area in Jiangxi Province of China as the case study, the advantages, technical principles, and application methods of solar energy technology for highway service area including solar photoelectric technology and solar water heating technology were discussed based on the analysis of characteristics of highway low-carbon service area; the system types, operation mode, and installing tilt angle of the two kinds of solar systems suitable for highway service areas were confirmed. It was proved that the reduction of the cost by electricity savings of solar system was huge. Taking the investment of the solar systems into account, the payback period of solar photoelectric systems and solar water heating systems was calculated. The economic effect of the solar systems in West Lushan highway service area during the effective operation periods was also calculated and proved very considerable.

  12. Areas control of a nuclear medicine service

    International Nuclear Information System (INIS)

    Silva, Islane C.S.; Silva, Iasmim M.S.; Júnior, Cláudio L.R.; Silva, Isvânia S.; Gonzalez, Kethyllém M.; Melo, Francisca A.; Lima, Fernando R.A.

    2017-01-01

    The measurement of the exposure rate of the sectors of a nuclear medicine service (NMS), with the purpose of establishing safety to the service workers and the public, classifying the areas according to the monitoring is presented. Following the studies on the classifications of the areas of a Nuclear Medicine service provided by the category regulatory standard, 3.05 CNEN-NN, measures were taken in all sectors of the NMS in order to classify the areas in: Free, controlled and supervised according to with the exposure level. As a measurement instrument, a Geiger-Muller counter of the digital type was used. The results obtained show a correlation with the Brazilian norm satisfactorily, referring to the exposure rate of the studied SMN sectors

  13. 78 FR 18592 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-03-27

    ...), Veronica Alcestte, Manager, Application Type: New NVO & OFF License Worldcraft Logistics LLC (NVO & OFF.... Salvat, Vice President, Application Type: Add NVO Service Bayshore Logistics & Services, LLC (NVO & OFF), 909 Westfield Avenue, Elizabeth, NJ 07208, Officers: Raquel Velez, Operating Manager (QI), Jose Moreno...

  14. 78 FR 50054 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-16

    ...), Ross V. Stemmler, President, Application Type: QI Change. Dawson Logistics, Inc. (OFF), 2220 South... (QI), Chad Earwood, President, Application Type: Add NVO Service. Fesco Integrated Transport North...), Ugochukwu O. Ene, President, Application Type: New NVO & OFF License. Icon Logistics Services LLC (OFF...

  15. The Application Study in Solar Energy Technology for Highway Service Area: A Case Study of West Lushan Highway Low-Carbon Service Area in China

    OpenAIRE

    Qin, Xiaochun; Shen, Yi; Shao, Shegang

    2015-01-01

    A lot of research works have been made concerning highway service area or solar technology and acquired great achievements. However, unfortunately, few works have been made combining the two topics together of highway service areas and solar energy saving to make a systemic research on solar technology application for highway service area. In this paper, taking West Lushan highway low-carbon service area in Jiangxi Province of China as the case study, the advantages, technical principles, and...

  16. A Real-time License Plate Detection System for Parking Access

    Directory of Open Access Journals (Sweden)

    Roenadi Koesdijarto

    2010-08-01

    Full Text Available The automatic and real-time license plate detection system can be used as an access control entry of vehicles into the parking area. The problem is how to recognize the vehicles that will go into the parking lot and how to recognize various types of license plates in various light conditions quickly and accurately. In this research, the prototype was developed with a detection system to recognize the vehicles that will enter the parking area, and a license plate recognition system. In the license plate recognition system, the Fourier transform and Hidden Markov model method have proposed to detect location of license plate and as characters segmentation to recognize Indonesia license plates. The research results have shown that the developed prototype system has successfully recognized all Indonesia license plates in several of light condition and camera position. The percentage of plate recognition in the real-time experiment is 84.38%, and the average execution time for all recognition process is 5.834 second.

  17. 7 CFR 46.3 - License required.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE MARKETING OF PERISHABLE AGRICULTURAL COMMODITIES REGULATIONS (OTHER... considered to result in separate firms and, therefore, do not require separate licenses. ...

  18. 7 CFR 46.6 - License fees.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE MARKETING OF PERISHABLE AGRICULTURAL COMMODITIES REGULATIONS (OTHER... commission merchants, brokers, and dealers (other than grocery wholesalers and retailers) the annual license...

  19. 7 CFR 1780.11 - Service area requirements.

    Science.gov (United States)

    2010-01-01

    ..., maintenance, debt service, and reserve requirements. Such guarantees from developers will meet the... 7 Agriculture 12 2010-01-01 2010-01-01 false Service area requirements. 1780.11 Section 1780.11... AGRICULTURE (CONTINUED) WATER AND WASTE LOANS AND GRANTS General Policies and Requirements § 1780.11 Service...

  20. EMPIRICAL STUDY OF CAR LICENSE PLATES RECOGNITION

    Directory of Open Access Journals (Sweden)

    Nasa Zata Dina

    2015-01-01

    Full Text Available The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms have been proposed by many researchers. License plate recognition requires license plate detection, segmentation, and charac-ters recognition. The algorithm detects the position of a license plate and extracts the characters. Various license plate recognition algorithms have been implemented, and each algorithm has its strengths and weaknesses. In this research, I implement three algorithms for detecting license plates, three algorithms for segmenting license plates, and two algorithms for recognizing license plate characters. I evaluate each of these algorithms on the same two datasets, one from Greece and one from Thailand. For detecting li-cense plates, the best result is obtained by a Haar cascade algorithm. After the best result of license plate detection is obtained, for the segmentation part a Laplacian based method has the highest accuracy. Last, the license plate recognition experiment shows that a neural network has better accuracy than other algo-rithm. I summarize and analyze the overall performance of each method for comparison.

  1. 77 FR 38288 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-06-27

    ..., President. Application Type: QI Change. Freight Logistics Services USA Forwarding Ltd (OFF), 15955 W. Hardy... Individual). Application Type: Add OFF Service. Pudong Prime Int'l Logistics, Inc. (NVO), 9660 Flair Drive... License. Benchmark Worldwide Logistics, Inc. dba Star Ocean Lines (NVO & OFF), 24900 South Route 53...

  2. 76 FR 33757 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-06-09

    ... NVO & OFF License. The Ultimate Logistics Service Corporation (NVO & OFF), 3 Birch Place, Pine Brook... Logistics, Corp. (NVO), 4713 Deeboyar, Lakewood, CA 90712. Officer: Tan Sek, Pres/VP/Sec/Treasurer...), Application Type: Add OFF Service. Oceanic Link USA LLC (NVO & OFF), 5430 Jimmy Carter Blvd., Suite 216...

  3. Empirical Study of Car License Plates Recognition

    OpenAIRE

    Dina, Nasa Zata; Dailey, Matthew

    2015-01-01

    The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms ...

  4. The USNCR license renewal process

    International Nuclear Information System (INIS)

    Kuo, Pao-Tsin

    2002-01-01

    The US Congress promulgated a law in 1954, entitled 'Atomic Energy Act'. This Act states that operating licenses for commercial nuclear power plants are limited to a fixed term of 40 years, but they may be renewed for a period not to exceed 20 years. The terms were established mainly for economic considerations, not based on technical limitations. The U.S. Nuclear Regulatory Commission (USNRC) published the license renewal rule, Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), in December, 1991. The rule has since been amended in May, 1995. The underlying principle of the rule is that the regulatory process is adequate for ensuring safety of operating plants. The regulatory process includes NRC's issuance of Orders, Bulletins, Generic Letters, and Information Notices, as well as a number of special inspections in addition to the continuous oversight and routine inspection activities performed by on-site inspectors. Because of this comprehensive regulatory process, compilation of the current license basis or re-verification of the current licensing basis is not considered necessary for a license renewal review. The USNRC also determined on the basis of the findings of its research programs that active structures and components are well maintained by the existing programs. Therefore, the focus of the license renewal review is on passive, long-lived structures and components and on time-limited ageing analyses. The time-limited ageing analyses are for those structures and components which were originally designed to a 40 year service life

  5. Violence prevention and municipal licensing of indoor sex work venues in the Greater Vancouver Area: narratives of migrant sex workers, managers and business owners.

    Science.gov (United States)

    Anderson, Solanna; Jia, Jessica Xi; Liu, Vivian; Chattier, Jill; Krüsi, Andrea; Allan, Sarah; Maher, Lisa; Shannon, Kate

    2015-01-01

    Using a socio-ecological, structural determinants framework, this study assesses the impact of municipal licensing policies and related policing practices across the Greater Vancouver Area (Canada) on the risk of violence within indoor sex work venues. Qualitative interviews were conducted with 46 migrant/immigrant sex workers, managers and owners of licensed indoor sex work establishments and micro-brothels. Findings indicate that policing practices and licensing requirements increase sex workers' risk of violence and conflict with clients and result in heightened stress, an inability to rely on police support, lost income and the displacement of sex workers to more hidden informal work venues. Prohibitive licensing and policing practices prevent sex workers, managers and owners from adopting safer workplace measures and exacerbate health and safety risks for sex workers. This study provides critical evidence of the negative public health implications of prohibitive municipal licensing in the context of a criminalised and enforcement-based approach to sex work. Workplace safety recommendations include the decriminalisation of sex work and the elimination of disproportionately high fees for licences, criminal record restrictions, door lock restrictions, employee registration requirements and the use of police as licensing inspectors.

  6. 42 CFR 418.62 - Condition of participation: Licensed professional services.

    Science.gov (United States)

    2010-10-01

    ... assessments, developing and evaluating the plan of care, and contributing to patient and family counseling and education; and (c) Licensed professionals must participate in the hospice's quality assessment and...

  7. 77 FR 39707 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-07-05

    ..., Application Type: New OFF License. Best Global Logistics USA, Inc dba Siam Intercargo Services (NVO & OFF... International Transport, LLC (NVO), 6048 Lido Lane, Long Beach, CA 90803, Officer: Charles Brennan, Member...: Add NVO Service. Sinai Logistics LLC (NVO & OFF), 11419 NW. 112th Street, Medley, FL 33178, Officer...

  8. 77 FR 3773 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-01-25

    .... Hartwig Gdynia dba C. Hartwig Transport (NVO), 7, Derdowskiego Street, 81-369 Gdynia, Poland. Officers...: New OFF License. Cheryl G. Wilson dba JC Logistics (NVO & OFF), 28612 Redondo Beach Drive South, Des...: Add NVO Service. CR & J Logistics, Inc. dba Brightwater Shipping Services (NVO & OFF), 8401 Lake Worth...

  9. 75 FR 20997 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-04-22

    ... 77354. Officers: Thomas C. Gaze, President, Qualifying Individual). Lori L. Gaze, Secretary/Treasurer... Services, (Qualifying Individual). George T. Cook, President/Treasurer, Application Type: New OFF License...

  10. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  11. The road to MYRRHA. The pre-licensing phase and FEED

    International Nuclear Information System (INIS)

    2014-01-01

    The article discusses the study phase of the future research reactor MYRRHA. This study phase covers three major areas: Research and Development, licensing and engineering. In 2013, substantial progress was made in the licensing and engineering processes: licensing is currently in the pre-licensing phase, while, for engineering, the Front-end Engineering and Design (FEED) contract was signed for the construction of the non-nuclear parts of MYRRHA. The article highlights work associated with the the pre-licensing phase and the FEED.

  12. Mandatory Class 1 Federal Areas Web Service

    Data.gov (United States)

    U.S. Environmental Protection Agency — This web service contains the following layers: Mandatory Class 1 Federal Area polygons and Mandatory Class 1 Federal Area labels in the United States. The polygon...

  13. Conditions for licensing workers exposed to ionizing radiation

    International Nuclear Information System (INIS)

    2007-01-01

    This entrance speaking on conditions of license workers in the areas of employment ionizing radiation addresses two aspects, the first aspect: industrial applications: speak for the workers in this area by a supervisor to portray industrial and industrial photographer and a supervisor sounding wells and a Nuclear Gauges Supervisor and the previous and subsequent Practices of the law The second aspect: about the medical applications and describes the general conditions of the licenses in this area and those working in this area of professional diagnostic radiology and nuclear medicine technician and technician treatment of radiotherapy and radiation protection officers at large and small institutions

  14. Electrical substation service-area estimation using Cellular Automata: An initial report

    Energy Technology Data Exchange (ETDEWEB)

    Fenwick, J.W.; Dowell, L.J.

    1998-07-01

    The service areas for electric power substations can be estimated using a Cellular Automata (CA) model. The CA model is a discrete, iterative process whereby substations acquire service area by claiming neighboring cells. The service area expands from a substation until a neighboring substation service area is met or the substation`s total capacity or other constraints are reached. The CA-model output is dependent on the rule set that defines cell interactions. The rule set is based on a hierarchy of quantitative metrics that represent real-world factors such as land use and population density. Together, the metrics determine the rate of cell acquisition and the upper bound for service area size. Assessing the CA-model accuracy requires comparisons to actual service areas. These actual service areas can be extracted from distribution maps. Quantitative assessment of the CA-model accuracy can be accomplished by a number of methods. Some are as simple as finding the percentage of cells predicted correctly, while others assess a penalty based on the distance from an incorrectly predicted cell to its correct service area. This is an initial report of a work in progress.

  15. 7 CFR 46.9 - Termination, suspension, revocation, cancellation of licenses; notices; renewal.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE MARKETING OF PERISHABLE AGRICULTURAL COMMODITIES REGULATIONS (OTHER THAN RULES OF PRACTICE) UNDER THE..., within four years from the date of the issuance of the license, the license shall be automatically...

  16. Identifying priority areas for ecosystem service management in South African grasslands.

    Science.gov (United States)

    Egoh, Benis N; Reyers, Belinda; Rouget, Mathieu; Richardson, David M

    2011-06-01

    Grasslands provide many ecosystem services required to support human well-being and are home to a diverse fauna and flora. Degradation of grasslands due to agriculture and other forms of land use threaten biodiversity and ecosystem services. Various efforts are underway around the world to stem these declines. The Grassland Programme in South Africa is one such initiative and is aimed at safeguarding both biodiversity and ecosystem services. As part of this developing programme, we identified spatial priority areas for ecosystem services, tested the effect of different target levels of ecosystem services used to identify priority areas, and evaluated whether biodiversity priority areas can be aligned with those for ecosystem services. We mapped five ecosystem services (below ground carbon storage, surface water supply, water flow regulation, soil accumulation and soil retention) and identified priority areas for individual ecosystem services and for all five services at the scale of quaternary catchments. Planning for individual ecosystem services showed that, depending on the ecosystem service of interest, between 4% and 13% of the grassland biome was required to conserve at least 40% of the soil and water services. Thirty-four percent of the biome was needed to conserve 40% of the carbon service in the grassland. Priority areas identified for five ecosystem services under three target levels (20%, 40%, 60% of the total amount) showed that between 17% and 56% of the grassland biome was needed to conserve these ecosystem services. There was moderate to high overlap between priority areas selected for ecosystem services and already-identified terrestrial and freshwater biodiversity priority areas. This level of overlap coupled with low irreplaceability values obtained when planning for individual ecosystem services makes it possible to combine biodiversity and ecosystem services in one plan using systematic conservation planning. Copyright © 2011 Elsevier Ltd. All

  17. 21 CFR 515.22 - Suspension and/or revocation of approval of a medicated feed mill license.

    Science.gov (United States)

    2010-04-01

    ... medicated feed mill license. 515.22 Section 515.22 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT... MILL LICENSE Administrative Actions on Licenses § 515.22 Suspension and/or revocation of approval of a medicated feed mill license. (a) The Secretary of Health and Human Services may suspend a medicated feed...

  18. 7 CFR 27.11 - Area Director, Marketing Services Office; responsibility.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Area Director, Marketing Services Office... MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE COMMODITY... Regulations Administration § 27.11 Area Director, Marketing Services Office; responsibility. Subject to this...

  19. The Texas concurrent characterization, licensing, and development process

    Energy Technology Data Exchange (ETDEWEB)

    Avant, R.V. Jr. [Texas Low-Level Radioactive Waste Disposal Authority, Austin, TX (United States)

    1993-03-01

    The 72nd Texas Legislature specifically delineated a 400-square-mile area in southeast Hudspeth County where siting activities would be limited. The Authority was given unprecedented powers of property access and eminent domain and expanded budget authority to conduct site selection, characterization, and licensing. In the summer of 1991, the Authority identified five general siting areas in the prescribed region, and in the fall of 1991, the Authority narrowed the siting area to one large ranch composed of about 16,000 acres--called the Faskin Ranch. Site characterization began in 1991 and will be complete by September 1993. In September 1991, Authority staff began preparing the license application and included all available information on the Faskin Ranch. At its February meeting, the Authority`s board directed staff to submit the license application to the Texas Water Commission (the new Texas radiation control agency). The license application was submitted on March 2, 1992, and on April 15, 1992, the Commission determined that the application was sufficiently complete to begin review. Discrete technical packages such as groundwater hydrology, surface water hydrology, design, etc., will be submitted to the agency for review on the completion of each package. A schedule has been developed to allow the regulators the maximum time possible to review critical technical areas while minimizing the total review period.

  20. Why trash don't pass? pharmaceutical licensing and safety performance of drugs.

    Science.gov (United States)

    Banerjee, Tannista; Nayak, Arnab

    2017-01-01

    This paper examines how asymmetric information in pharmaceutical licensing affects the safety standards of licensed drugs. Pharmaceutical companies often license potential drug molecules at different stages of drug development from other pharmaceutical or biotechnology companies and complete the remaining of research stages before submitting the new drug application(NDA) to the food and drug administration. The asymmetric information associated with the quality of licensed molecules might result in the molecules which are less likely to succeed to be licensed out, while those with greater potential of success being held internally for development. We identify the NDAs submitted between 1993 and 2004 where new molecular entities were acquired through licensing. Controlling for other drug area specific and applicant firm specific factors, we investigate whether drugs developed with licensed molecules face higher probability of safety based recall and ultimate withdrawal from the market than drugs developed internally. Results suggest the opposite of Akerlof's (Q J Econ 84:488-500, 1970) lemons problem. Licensed molecules rather have less probability of facing safety based recalls and ultimate withdrawal from the market comparing to internally developed drug molecules. This suggests that biotechnology and small pharmaceutical firms specializing in pharmaceutical research are more efficient in developing good potential molecules because of their concentrated research. Biotechnology firms license out good potential molecules because it increases their market value and reputation. In addition, results suggest that both the number of previous approved drugs in the disease area, and also the applicant firms' total number of previous approvals in all disease areas reduce the probability that an additional approved drug in the same drug area will potentially be harmful.

  1. 75 FR 25257 - Ocean Transportation Intermediary License Revocation

    Science.gov (United States)

    2010-05-07

    ... to maintain a valid bond. License Number: 3330F. Name: ABM International Corporation dba... System dba Cargo Alliance Service. Address: 1071 Sneath Lane, San Bruno, CA 94066. Date Revoked: March 14...

  2. 78 FR 57633 - Ocean Transportation Intermediary License Reissuances

    Science.gov (United States)

    2013-09-19

    ...: International Transport Services, Inc. Address: 19987 Commerce Parkway, Cleveland, OH 44130. Date Reissued...: July 4, 2013. License No.: 024023N. Name: OES Logistics, Inc. Address: 10900 E. 183rd Street, 130...

  3. Commitment of Licensed Social Workers to Aging Practice

    Science.gov (United States)

    Simons, Kelsey; Bonifas, Robin; Gammonley, Denise

    2011-01-01

    This study sought to identify client, professional, and employment characteristics that enhance licensed social workers' commitment to aging practice. A series of binary logistic regressions were performed using data from 181 licensed, full-time social workers who reported aging as their primary specialty area as part of the 2004 NASW's national…

  4. Use of geographical information systems for delimiting health service areas in China

    Directory of Open Access Journals (Sweden)

    Xuechen Xiong

    2017-05-01

    Full Text Available With the objective of choosing a practical and valid method to delimit health service areas of regional health service centres to build a regional basic health service network, we first drew lessons from traditional geographic methods of delimiting trade areas and then applied two methods to delimit health service areas, i.e. the proximal method and the gravity method. We verified the effectiveness of these methods by an index of similarity with the aid of real in-patient data. Calculation of the similarity indices shows that health service areas delimited by the proximal method has an 87.3% similarity to the real health service area, while the gravity method gives 88.6%. Our conclusion is that both methods are suitable for delimiting health service areas at regional health service centres, but find that the proximal method is more practicable in operational terms for delimiting health service areas in region health planning.

  5. Dynamic Spectrum Access for Internet of Things Service in Cognitive Radio-Enabled LPWANs.

    Science.gov (United States)

    Moon, Bongkyo

    2017-12-05

    In this paper, we focus on a dynamic spectrum access strategy for Internet of Things (IoT) applications in two types of radio systems: cellular networks and cognitive radio-enabled low power wide area networks (CR-LPWANs). The spectrum channel contention between the licensed cellular networks and the unlicensed CR-LPWANs, which work with them, only takes place within the cellular radio spectrum range. Our aim is to maximize the spectrum capacity for the unlicensed users while ensuring that it never interferes with the licensed network. Therefore, in this paper we propose a dynamic spectrum access strategy for CR-LPWANs operating in both licensed and unlicensed bands. The simulation and the numerical analysis by using a matrix geometric approach for the strategy are presented. Finally, we obtain the blocking probability of the licensed users, the mean dwell time of the unlicensed user, and the total carried traffic and combined service quality for the licensed and unlicensed users. The results show that the proposed strategy can maximize the spectrum capacity for the unlicensed users using IoT applications as well as keep the service quality of the licensed users independent of them.

  6. Inspection of the brazilian nuclear regulatory body in the area of radiotherapy. A critical analysis; Inspecao do orgao regulador nuclear brasileiro na area de radioterapia. Uma analise critica

    Energy Technology Data Exchange (ETDEWEB)

    Brito, Ricardo Roberto de Azevedo

    2005-07-01

    The National Commission of Nuclear Energy (CNEN) is responsible in Brazil for the activities of licensing and control of radioactive installations in the radiotherapy medical area. The majority of these activities are developed by CNEN Co-ordination of Radioactive Installations (CORAD). One of the necessary stages for the development of licensing and control activities is the inspection of radiotherapy services (clinics and hospitals). Almost all of these inspections are carried out by CNEN Inst. of Radiation Protection and Dosimetry (IRD), through its Service of Medical Physics in Radiotherapy and Nuclear Medicine (SEFME). This work makes a survey of the main nonconformities found during ten years of inspections in radiotherapy services (1995 - 2004) and analyses the efficiency of these inspections in making the radiotherapy services develop their activities according to the norms in vigour in the country and adopt corrective actions against, at least, the nonconformities evidenced by CNEN inspectors. Additionally, it analyses the possibility of improvement and / or the optimisation of the process, through a procedure able to be unified and controlled, aiming a prompt communication to those involved in the licensing process (SEFME and CORAD) about the attendance by the radiotherapy services to the non-conformity items observed during the inspection. (author)

  7. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  8. License application approach for the California LLRW disposal facility

    International Nuclear Information System (INIS)

    Gaynor, R.K.; Romano, S.A.; Hanrahan, T.P.

    1990-01-01

    US Ecology, Inc. is the State of California's license designee to site, develop and operate a low-level radioactive waste (LLRW) disposal facility to serve member states of the Southwestern Compact. US Ecology identified a proposed site in the Ward Valley of southeastern California in March 1988. Following proposed site selection, US Ecology undertook studies required to prepare a license application. US Ecology's license application for this desert site was deemed complete for detailed regulatory review by the California Department of Health Services (DHS) in December 1989. By mutual agreement, disposal of mixed waste is not proposed pending the State of California's decision on appropriate management of this small LLRW subset

  9. Selecting cost-effective areas for restoration of ecosystem services.

    Science.gov (United States)

    Adame, M F; Hermoso, V; Perhans, K; Lovelock, C E; Herrera-Silveira, J A

    2015-04-01

    Selection of areas for restoration should be based on cost-effectiveness analysis to attain the maximum benefit with a limited budget and overcome the traditional ad hoc allocation of funds for restoration projects. Restoration projects need to be planned on the basis of ecological knowledge and economic and social constraints. We devised a novel approach for selecting cost-effective areas for restoration on the basis of biodiversity and potential provision of 3 ecosystem services: carbon storage, water depuration, and coastal protection. We used Marxan, a spatial prioritization tool, to balance the provision of ecosystem services against the cost of restoration. We tested this approach in a mangrove ecosystem in the Caribbean. Our approach efficiently selected restoration areas that at low cost were compatible with biodiversity targets and that maximized the provision of one or more ecosystem services. Choosing areas for restoration of mangroves on the basis carbon storage potential, largely guaranteed the restoration of biodiversity and other ecosystem services. © 2014 Society for Conservation Biology.

  10. 78 FR 78309 - Mechanical and Digital Phonorecord Delivery Compulsory License

    Science.gov (United States)

    2013-12-26

    ... time since the issuance of the NPRM, marketplace developments and changes in business models may be... and Digital Phonorecord Delivery Compulsory License AGENCY: U.S. Copyright Office, Library of Congress... locker services and purchased content locker services. Mechanical and Digital Phonorecord Delivery...

  11. 47 CFR 74.787 - Digital licensing.

    Science.gov (United States)

    2010-10-01

    ..., AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBUTIONAL SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.787 Digital licensing. (a) Applications for digital low power television and... channels may be filed at any time. Such applications shall be filed on FCC Form 346 and will be treated as...

  12. Licensing of simple digital devices

    International Nuclear Information System (INIS)

    Jackson, T. W.

    2008-01-01

    The inability to guarantee error-free software gave rise to the potential for common-cause failure of digital safety systems in nuclear power plants. To address this vulnerability, the U. S. Nuclear Regulatory Commission (NRC) required a quality software development process and a defense-in-depth and diversity analysis for digital safety systems. As a result of recent interim [NRC] staff guidance in the digital instrumentation and control (I and C) area, licensing of simple digital devices decreases some regulatory burden with respect to demonstrating a quality software development process and defense-in-depth and diversity analysis. This paper defines simple digital devices and addresses the interim staff guidance that applies to such devices. The paper also highlights the technical aspects that affect the licensing of such devices and incorporates licensing experience in the U.S. to date. (authors)

  13. THE ECONOMIC APPROACH OF ECOSYSTEM SERVICES PROVIDED BY PROTECTED AREAS

    Directory of Open Access Journals (Sweden)

    Cirnu Maria

    2015-07-01

    Full Text Available As practice shows us, at the present time ecosystem services are recognized by humanity, but unfortunately are undervalued compared to their full potential. Most of planet's ecosystems are degradated by anthropic activity of humankind. It is almost impossible to say that there are no areas affected by human activity, however, the Protected Areas are a good opportunity, so the assessing of ecosystem services in Protected Areas can be a solution to the problem of economic growth. At present, there are few consistent informations on economic value of ecosystem services in Romania, on the basis of which can be adopted some sustainable financing policies of activities in Protected Areas. The premise from which we start is that a proper management of natural capital will allow biodiversity conservation and human well-being if it find appropriate economic instruments. For this reason, studies of economic research on the contribution of those ecosystem services to the communities welfare may constitute credible means for decision-makers, demonstrating the Protected Areas importance. This paper, based on the study of international and national literature, examines the state of knowledge on the economic and environmental valences of ecosystem services. The growing interest of researchers regarding the economic valuation of ecosystem services related to Protected Areas is visible through the many studies carried out at international level. Although national scientific research relating to ecosystem services is at the beginning, concerns researchers economists and ecologists have been directed toward this recess, of ecosystem services. The reason for we should assign an economic value to ecosystem services is to ensure that their value is included actively in decision-making and is not ignored because "is still available". Briefly, the paper start with an overview of the main definition of ecosystem services. From the point of economic value view, the paper

  14. Public licenses and public domain as alternatives to copyright

    OpenAIRE

    Köppel, Petr

    2012-01-01

    The work first introduces the area of public licenses as a space between the copyright law and public domain. After that, consecutively for proprietary software, free and open source software, open hardware and open content, it maps particular types of public licenses and the accompanying social and cultural movements, puts them in mutual as well as historical context, examines their characteristics and compares them to each other, shows how the public licenses are defined by various accompan...

  15. 47 CFR 90.751 - Minor modifications of Phase I, non-nationwide licenses.

    Science.gov (United States)

    2010-10-01

    ... SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Regulations Governing Licensing and Use of... relocate their initially authorized base station, i.e., locate their base station at a site other than its...

  16. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  17. [Burnout syndrome in licensed nurses. Approaches for a debate].

    Science.gov (United States)

    de los Ríos-Castillo, José Lauro; Barrios-Santiago, Pedro; Ocampo-Mancilla, Mariano; Avila-Rojas, Teresa Luzeldy

    2007-01-01

    The burnout syndrome (BS) is characterized by emotional fatigue, loss of personal identity and loss of personal realization feelings. BS is frequent among professionals that assist people (health care workers) and among those that have interpersonal contact; the occupational characteristics are among BS contributing factors. The objective was to ascertain BS prevalence among nurses affiliated to the San Luis Potosí General Hospital. A cross-sectional survey was carried out with a groups of nurses who gave their informed consent to participate. The Brief Questionnaire of Burnout version standardized for Mexico was used to collect the information. This version explores the following areas: emotional fatigue, loss of personal identity and personal realization. Also, participants answered three questionnaires about their socio-demographic characteristics, occupational satisfaction, family variables and emotional dysfunction. 70 licensed nurses participated. The BS was common among participants. Some variables related to BS were: age older than 30 years, being female, being married, housekeeping work, absenteeism due to illness, serious depression and occupational dissatisfaction. Nurses working at the emergency room and in critical care services had BS more often. The burnout syndrome has a high prevalence among licensed nurses. Interventions to decrease and to avert BS are needed.

  18. The licensing of nuclear power plants in Brazil

    International Nuclear Information System (INIS)

    Lederman, L.

    1980-01-01

    In Brazil the governmental organization responsible for the licensing of NPPs is the Comissao Nacional de Energia Nuclear (CNEN), the Brazilian Regulatory Body. A description of CNEN's organization, responsabilities and working methods, as well as the present situation of the Brazilian NPPs undergoing licensing, has recently been presented. In this paper the experience gained by CNEN in the course of licensing Brazilian NPPs Units I and II is discussed. CNEN's present day technical competence and its future trends are analysed with regard to in-house capacity, foreign consultants and research contracts with Brazilian Universities. Finally, the immediate need for a Safety research programm in support of licensing is discussed. Manpower needs and major areas for such a programm are also indicated. (orig./RW)

  19. Future of Nuclear Power: NRC emergency preparedness licensing activities agenda

    International Nuclear Information System (INIS)

    Essig, T.H.

    1995-01-01

    This talk summary addresses the issue of how future policies of the NRC will affect nuclear power in areas such as construction, emergency preparedness, and licensing. Specific topics covered include the following: Emergent EP licensing issues for operating nuclear Power Plants; 10CFR Part 52 and the process for licensing of Advanced Light Water Reactors (ALWRs); and potential revisions to emergency preparedness programs for future nuclear power plants

  20. 37 CFR 370.2 - Notice of use of sound recordings under statutory license.

    Science.gov (United States)

    2010-07-01

    ... BOARD, LIBRARY OF CONGRESS NOTICE AND RECORDKEEPING REQUIREMENTS FOR STATUTORY LICENSES NOTICE AND... gain access to the online Web site or homepage of the Service, or where information may be posted under... obtained from the Copyright Office or to: Library of Congress, Copyright Office, Licensing Division, 101...

  1. IRIS pre-application licensing

    International Nuclear Information System (INIS)

    Carelli, Mario D.; Kling, Charles L.; Ritterbusch, Stanley E.

    2003-01-01

    This paper presents the approach to pre-application licensing by the International Reactor Innovative and Secure (IRIS), and advanced, integral reactor design with a thermal power of 1000 MW. The rationale for the pre-application licensing is discussed. Since IRIS technology is based on proven LWR experience, the project will rely on AP600/AP1000 precedent and will focus during the pre-application on long lead and novel items. A discussion of the evolution of the project to significantly reduce licensing issues is provided, followed by a summary of the IRIS safety-by-design which provides a formidable first step in the Defense in Depth approach. The effects of the safety-by-design, as well as of passive systems, on the IRIS safety will be investigated in a proposed testing program that will be reviewed by NRC during the pre-application. Documentation to be provided to NRC is discussed. Early design analyses indicate that the benefits of the IRIS safety-by-design approach are so significant that the basic premise of current emergency planning regulations (i.e., likelihood of core damage) will be reduced to the extent that special emergency response planning beyond the exclusion area boundary may not be needed. How this very significant outcome can be effected through a highly risk-informed licensing is discussed. (author)

  2. Business Development Management and Services Area

    International Nuclear Information System (INIS)

    2006-01-01

    The creation in ENSA of the new Business Development Management is meant to leverage ENSA's activities by taking advantage of the previous experience gained by the services area to have a much more active presence than before in both the national and international market for goods and services of the nuclear industry. The Management's activities go beyond the traditional, mature activity of large nuclear components manufacturing developed in ENSA since it was founded. This article details the activities of this new Management and its future projection. (Author)

  3. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  4. 76 FR 22104 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-04-20

    ...), Application Type: Business Structure Change Foothills Logistics, Inc. (NVO), 2045 John Crosland Jr. Way... Individual), Daniel Gelpi, President, Application Type: Add NVO Service ADM Logistics, Inc. (NVO & OFF), 4666... (Qualifying Individual), Application Type: New NVO & OFF License ATC Logistics, Inc. (NVO & OFF), 14350...

  5. A Malaysian Vehicle License Plate Localization and Recognition System

    Directory of Open Access Journals (Sweden)

    Ganapathy Velappa

    2008-02-01

    Full Text Available Technological intelligence is a highly sought after commodity even in traffic-based systems. These intelligent systems do not only help in traffic monitoring but also in commuter safety, law enforcement and commercial applications. In this paper, a license plate localization and recognition system for vehicles in Malaysia is proposed. This system is developed based on digital images and can be easily applied to commercial car park systems for the use of documenting access of parking services, secure usage of parking houses and also to prevent car theft issues. The proposed license plate localization algorithm is based on a combination of morphological processes with a modified Hough Transform approach and the recognition of the license plates is achieved by the implementation of the feed-forward backpropagation artificial neural network. Experimental results show an average of 95% successful license plate localization and recognition in a total of 589 images captured from a complex outdoor environment.

  6. 7 CFR 400.207 - Representative licensing and certification.

    Science.gov (United States)

    2010-01-01

    ... insurance; (5) Liability insurance; or (6) Fire insurance and allied lines. The Contractor must submit... INSURANCE CORPORATION, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE REGULATIONS Agency Sales and Service... policies are issued, which license authorizes the sales of insurance in any one or more of the following...

  7. 77 FR 40882 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-07-11

    ..., Director, Application Type: License Transfer & QI Change. Gulf Premier Logistics LLC (NVO & OFF), 340 N... & OFF), 1163 Fairway Drive, 106, City of Industry, CA 91789, Officer: XiuJi Zhang, President, (Qualifying Individual), Application Type: Add NVO Service. Simple Logistics Inc. (NVO), 147-35 Farmers...

  8. 76 FR 16420 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-03-23

    ...), Andrew P. Bottomley, Managing Partner, Application Type: QI Change and Add OFF Service. All Transport... Type: New NVO & OFF License. Andrea Bigi dba AB Global Logistics Consulting (OFF), 1010 19th Street, 10.... Officers: Joanne Kirkpatrick, International Logistics Officer (Qualifying Individual), Jack R. Lentz, CEO...

  9. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Loa, W.W.; Chen, S.; Yu, W.C.; Peng, C.M.; Huang, C.L.; Lin, C.

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal fo High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated because too many factors must be taken into consideration. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper the authors will discuss the development of the radioactive waste management licensing review assistant

  10. 47 CFR 80.13 - Station license required.

    Science.gov (United States)

    2010-10-01

    ... signals using a marine radio operating in the 156-162 MHz band, any type of AIS, any type of EPIRB, and any type of radar installation. All other transmissions must be authorized under a ship station... paragraph (c) of this section, stations in the maritime service must be licensed by the FCC either...

  11. Inspection of the brazilian nuclear regulatory body in the area of radiotherapy. A critical analysis

    International Nuclear Information System (INIS)

    Brito, Ricardo Roberto de Azevedo

    2005-01-01

    The National Commission of Nuclear Energy (CNEN) is responsible in Brazil for the activities of licensing and control of radioactive installations in the radiotherapy medical area. The majority of these activities are developed by CNEN Co-ordination of Radioactive Installations (CORAD). One of the necessary stages for the development of licensing and control activities is the inspection of radiotherapy services (clinics and hospitals). Almost all of these inspections are carried out by CNEN Inst. of Radiation Protection and Dosimetry (IRD), through its Service of Medical Physics in Radiotherapy and Nuclear Medicine (SEFME). This work makes a survey of the main nonconformities found during ten years of inspections in radiotherapy services (1995 - 2004) and analyses the efficiency of these inspections in making the radiotherapy services develop their activities according to the norms in vigour in the country and adopt corrective actions against, at least, the nonconformities evidenced by CNEN inspectors. Additionally, it analyses the possibility of improvement and / or the optimisation of the process, through a procedure able to be unified and controlled, aiming a prompt communication to those involved in the licensing process (SEFME and CORAD) about the attendance by the radiotherapy services to the non-conformity items observed during the inspection. (author)

  12. Access all areas? An area-level analysis of accessibility to general practice and community pharmacy services in England by urbanity and social deprivation.

    Science.gov (United States)

    Todd, Adam; Copeland, Alison; Husband, Andy; Kasim, Adetayo; Bambra, Clare

    2015-05-08

    (1) To determine the percentage of the population in England that has access to a general practitioner (GP) premises within a 20 min walk (the accessibility); (2) explore the relationship between the walking distance to a GP premises and urbanity and social deprivation and (3) compare accessibility of a GP premises to that of a community pharmacy--and how this may vary by urbanity and social deprivation. This area-level analysis spatial study used postcodes for all GP premises and community pharmacies in England. Each postcode was assigned to a population lookup table and Lower Super Output Area (LSOA). The LSOA was then matched to urbanity (urban, town and fringe, or village, hamlet and isolated dwellings) and deprivation decile (using the Index of Multiple Deprivation score 2010). Living within a 20 min walk of a GP premises. Overall, 84.8% of the population is estimated to live within a 20 min walk of a GP premises: 81.2% in the most affluent areas, 98.2% in the most deprived areas, 94.2% in urban and 19.4% in rural areas. This is consistently lower when compared with the population living within a 20 min walk of a community pharmacy. Our study shows that the vast majority of the population live within a 20 min walk of a GP premises, with higher proportions in the most deprived areas--a positive primary care law. However, more people live within a 20 min walk of a community pharmacy compared with a GP premises, and this potentially has implications for the commissioning of future services from these healthcare providers in England. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  13. Fuel Receiving and Storage Station. License application, amendment 7

    International Nuclear Information System (INIS)

    1976-02-01

    Amendment No. 7 to Allied-General Nuclear Services application for licensing of the Fuel Receiving and Storage Station consists of revised pages for: Amendment No. 7 to AG-L 105, ''Technical Description in Support of Application for FRSS Operation''; Amendment No. 1 to AG-L 105A, ''Early Operation of the Service Concentrator''; and Amendment No. 2 to AG-L 110, ''FRSS Summary Preoperational Report.''

  14. 78 FR 71611 - Ocean Transportation Intermediary License Revocations and Terminations

    Science.gov (United States)

    2013-11-29

    .... Name: New York Logistic Services, Inc. Address: 1308 Merrywood Drive, Edison, NJ 08817. Date Revoked... maintain valid bonds. ;License No.: 022367N. Name: Blue Ocean Logistics Corporation dba B.O. Logistic Corp...

  15. 78 FR 75345 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-12-11

    .... Romero, President (QI). Application Type: New NVO & OFF License. F.H.L. Logistics, Inc. (NVO & OFF), 1354.... Officers: Arif H. Butt, General Manager (QI), Unni Krishnan Nair, President. Application Type: New NVO...: Stephen F. Crooks, Vice President (QI), Scott Kelly, President. Application Type: Adding NVO Service...

  16. 31 CFR 515.548 - Services rendered by Cuba to United States aircraft.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Services rendered by Cuba to United... REGULATIONS Licenses, Authorizations, and Statements of Licensing Policy § 515.548 Services rendered by Cuba to United States aircraft. Specific licenses are issued for payment to Cuba of charges for services...

  17. 47 CFR 24.709 - Eligibility for licenses for frequency Blocks C or F.

    Science.gov (United States)

    2010-10-01

    ..., revenue from operations or other investments, business development, or expanded service shall not be... block licenses (1895-1900 MHz paired with 1975-1980 MHz); (B) For Tier 2 BTAs, two of the 10 MHz C block licenses (1895-1900 MHz paired with 1975-1980 MHz; 1900-1905 MHz paired with 1980-1985 MHz) and all 15 MHz...

  18. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Wei-Whua Loa; Suan Chen; Wei-Chu Yu

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal of High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated, because too many factors must be taken into consideration. For the time being, licensing review is as much an art as it is a science. The authority usually faces three major problems; (1) the availability of domain expert, (2) maintaining of high quality and consistent reviews, and (3) the documentation of the review process. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper we will discuss the development of the radioactive waste management licensing review assistant

  19. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  20. 78 FR 55698 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-09-11

    ...), Karla Costilla, Member/Manager, Application Type: New NVO & OFF License. ICAT Logistics, Inc. (OFF..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . Abaco Logistics Corporation..., CFO, Application Type: QI Change & Add OFF Service. American General Logistics, Inc. (NVO), 626 N...

  1. 75 FR 57797 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2010-09-22

    .... Knott dba DAK Logistics Services. Address: 1010 Bluejay Drive, Suisun City, CA 94585. Date Revoked...: August 21, 2010. Reason: Failed to maintain a valid bond. License Number: 021431N. Name: ARC Logistics... Number: 022033N. Name: General Logistics, Inc. Address: 1400 NW 159th Street, 105, Miami Gardens, FL...

  2. The prospects for ecosystem services provision in fragile states’ urban areas

    OpenAIRE

    Bogadi, Antonija

    2018-01-01

    In fragile states context of climate change vulnerability, poverty and lack of infrastructure, the ability of ecosystem services to provide for numerous human needs is indispensable. The focus of this paper is describing the prospects for ecosystem services provision in fragile states’ urban areas. This paper presents a distinct approach by analyzing actors with capacity to provide ecosystem services in urban areas: government, international partners and citizens. Using infrastructure investm...

  3. Coopetitive Business Models in Future Mobile Broadband with Licensed Shared Access (LSA)

    OpenAIRE

    P. Ahokangas; M. Matinmikko; I. Atkova; L.F. Minervini; S. Yrjölä; M. Mustonen

    2016-01-01

    Spectrum scarcity forces mobile network operators (MNOs) providing mobile broadband services to develop new business models that address spectrum sharing. It engages MNOs into coopetitive relationship with incumbents. Licensed Shared Access (LSA) concept complements traditional licensing and helps MNOs to access new spectrum bands on a shared basis. This paper discusses spectrum sharing with LSA from business perspective. It describes how coopetition and business model are linked conceptually...

  4. 77 FR 64992 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2012-10-24

    ...: Logistics, Inc. Address: 313 West Arundel Road, Baltimore, MD 21225. Date Revoked: September 21, 2012....: 019327N. Name: David A. Knott dba Dak Logistics Services. Address: 131-E Sunset Avenue, Suite 210, Suisun City, CA 94585. Date Revoked: September 28, 2012. Reason: Failed to maintain a valid bond. License No...

  5. 76 FR 72409 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-11-23

    ... NVO Service. Pink City Logistics USA LLC (NVO & OFF), 7 Emily Road, Manalapan, NJ 07726; Officers... at (202) 523-5843 or by email at [email protected] . AE Eagle Logistics Inc. (NVO & OFF), 765 Route 83... License. Daybreak Logistics, Inc. (NVO & OFF), 2804 N. Cannon Blvd., Kannapolis, NC 28083; Officers...

  6. 76 FR 67730 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-11-02

    ..., President, Application Type: Name Change/Trade Name Change Lion Transport, Inc. dba Amex Logistics (NVO... Individual), Caetano R. Lopes, Vice President, Application Type: Add NVO Service Eztrans Logistics Ltd. (NVO... Type: New OFF License LF Freight USA LLC dba LF Logistics dba LF Freight dba IDS Logistics USA, dba IDS...

  7. 47 CFR 22.911 - Cellular geographic service area.

    Science.gov (United States)

    2010-10-01

    ... Cellular Geographic Service Area (CGSA) of a cellular system is the geographic area considered by the FCC... application for modification of the CGSA using FCC Form 601, a depiction of what the carrier believes the CGSA... location and the locus of points where the predicted or measured median field strength finally drops to 32...

  8. QUALITY OF PUBLIC TRANSPORTATION SERVICES IN URBAN AREA OF ORADEA

    Directory of Open Access Journals (Sweden)

    Silaghi Simona

    2010-12-01

    Full Text Available Intensification of public transport in urban areas due to increased mobility at regional and national levels, discrepancies among urban areas with same population and lack of statistical data related to performance and quality of public transport services are the main determinants of this paper. A separation line must be drawn between quality of services and performance indicators of public transport system. Service quality is a multi subjective outcome of an array of intangible variables. Service quality can be approached from four directions: consumer, vehicle performance (including the human operator, specialized company in passenger transport, and the Government (local Councils. Availability, comfort and convenience are the two main indicators that must be evaluated by citizens as being with high grades for a good quality of urban transport services. The instrument used to gather data is the preference survey.

  9. More than a House of Cards: Developing a Firm Foundation for Streaming Media and Consumer-Licensed Content in the Library

    Directory of Open Access Journals (Sweden)

    William Cross

    2016-09-01

    Full Text Available This article will introduce traditional library practice for licensing multimedia content and discuss the way that consumer-licensing and streaming services disrupt that practice. Sections II and III describe the statutory copyright regime designed by Congress to facilitate the socially-valuable work done by libraries and the impact of the move from ownership to licensed content. Collecting multimedia materials has always presented special legal challenges for libraries, particularly as licensed content has replaced the traditional practice of purchasing and circulation based on the first sale doctrine. These issues have grown even more complex as streaming services like Netflix and Amazon and video game downloads through services like Steam have come to dominate the landscape. Section IV will describe the way that consumer-licensed materials, which not only remove the ownership that undergirds library practice, but also the ability to negotiate for library use, imperil the congressionally-designed balance. Section V will present a path forward for libraries to develop robust, cutting-edge collections that reflect a sophisticated understanding of the contractual and copyright issues at play.

  10. Set of rules SOR 2 licensing of nuclear reactors

    International Nuclear Information System (INIS)

    1976-05-01

    This is the set of rules promulgated by the Israel Atomic Energy Commission pursuant to the Supervision of Supplies and Services Law 5718-1957, Order regarding Supervision of Nuclear Reactors (1974) Chapter 3: Permits, to provide for the Licensing of Nuclear Reactors. (B.G.)

  11. To License or Not to License Remanufacturing Business?

    Directory of Open Access Journals (Sweden)

    Zu-Jun Ma

    2018-01-01

    Full Text Available Many original equipment manufacturers (OEMs face the choice of whether to license an independent remanufacturer (IR to remanufacture their used products. In this paper, we develop closed-loop supply chain models with licensed and unlicensed remanufacturing operations to analyze the competition and cooperation between an OEM and an IR. The OEM sells new products and collects used products through trade-ins, while the IR intercepts the OEM’s cores to produce remanufactured products and sell them in the same market. We derive optimal decisions for each of the two types of firms in licensed and unlicensed remanufacturing scenarios and identify conditions under which the OEM and the IR would be most likely to cooperate with each other in implementing remanufacturing. The results show although it is beneficial for an OEM to license an IR to remanufacture its cores, it is not always necessary for an IR to accept OEM’s authorization. Moreover, we contrast the result for licensed remanufacturing scenario in the decentralized system with that in the centrally coordinated system to quantify potential inefficiency resulting from decentralization of decision making.

  12. Technology licensing in China

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason; Chen, Jin

    2015-01-01

    We explore the landscape of technology licensing among Chinese entities in the period 2000–12, using a unique database on technological licensing from the State Intellectual Property Office of China. We find that: first, among Chinese licensee organizations, firms have dominated in terms...... of the number of licensed technologies; second, the geographical distribution of licensed technologies among the provinces has gradually reached a new quantitative balance; third, utility models are the most popular technologies to be licensed and the majority of technology licensing in China has been between...... Chinese entities, and most transactions have been local within provinces; and finally, Chinese firms have gradually in-licensed newer and newer technologies, but the technologies in-licensed from foreign sources are by no means state-of-the-art. We make several suggestions for innovation policy...

  13. Transition to e-government in Developing countries: The Case of Driver and Vehicle Licensing Authority (DVLA) e-Service Smart City Initiatives in Ghana

    DEFF Research Database (Denmark)

    Kofi Wireko, Joseph; Skouby, Knud Erik

    2016-01-01

    Most developing countries, especially in Africa are fighting corruption as a major barrier to development, and e-government is seen as a new way of addressing it. Besides generally being recognized as cost-efficient, e-government is thought to reduce corruption through increased transparency......, better accountability and, the disappearance of the “middle-man” in the acquisition of public services by the citizenry. This paper discusses the extent to which this has been achieved in Ghana by analyzing the implementation of e-government service of the Driver and Vehicle Licensing Authority (DVLA......) of Ghana using the “stages of growth” mode from a sociotechnical perspective. The outcome of the analysis suggests that the e-government service implementation by DVLA is still at its basic and rudimentary stage (Catalogue stage) and continuous presence of the “middle-man,” high level of corruption, lack...

  14. Foundation for the adequacy of the licensing bases

    International Nuclear Information System (INIS)

    1991-12-01

    The objective of this report is to describe the regulatory processes that assures that any plant-specific licensing bases will provide reasonable assurance that the operation of nuclear power plants will not be inimical to the public health and safety to the end of the renewal period. It is on the adequacy of this process that the Commission has determined that a formal renewal licensing review against the full range of current safety requirements would not add significantly to safety and is not needed to assure that continued operation throughout the renewal term is not inimical to the public health and safety or common defense and security. This document illustrates in general terms how the regulatory process has evolved in major safety issue areas. It also provides examples illustrating why it is unnecessary to re-review an operating plant's basis, except for age-related degradation unique to license renewal, at the time of license renewal. The report is a supplement to the Statement of Considerations for the Nuclear Regulatory Commission's rule (10 CFR Part 54) that established the criteria and standards governing nuclear power plant license renewal

  15. Access to eye health services among indigenous Australians: an area level analysis

    Directory of Open Access Journals (Sweden)

    Kelaher Margaret

    2012-09-01

    Full Text Available Abstract Background This project is a community-level study of equity of access to eye health services for Indigenous Australians. Methods The project used data on eye health services from multiple sources including Medicare Australia, inpatient and outpatient data and the National Indigenous Eye Health Survey. The analysis focused on the extent to which access to eye health services varied at an area level according to the proportion of the population that was Indigenous (very low = 0-1.0%, low = 1.1-3.0%, low medium = 3.1-6.0%, high medium = 6.1-10.0%, high = 10.1-20.0%, very high = 20 + %. The analysis of health service utilisation also took into account age, remoteness and the Socioeconomic Indices for Areas (SEIFA. Results The rate of eye exams provided in areas with very high Indigenous populations was two-thirds of the rate of eye exams for areas with very low indigenous populations. The cataract surgery rates in areas with high medium to very high Indigenous populations were less than half that reference areas. In over a third of communities with very high Indigenous populations the cataract surgery rate fell below the World Health Organization (WHO guidelines compared to a cataract surgery rate of 3% in areas with very low Indigenous populations. Conclusions There remain serious disparities in access to eye health service in areas with high Indigenous populations. Addressing disparities requires a co-ordinated approach to improving Indigenous people’s access to eye health services. More extensive take-up of existing Medicare provisions is an important step in this process. Along with improving access to health services, community education concerning the importance of eye health and the effectiveness of treatment might reduce reluctance to seek help.

  16. Ecosystem Services Modeling as a Tool for Defining Priority Areas for Conservation.

    Directory of Open Access Journals (Sweden)

    Gabriela Teixeira Duarte

    Full Text Available Conservationists often have difficulty obtaining financial and social support for protected areas that do not demonstrate their benefits for society. Therefore, ecosystem services have gained importance in conservation science in the last decade, as these services provide further justification for appropriate management and conservation of natural systems. We used InVEST software and a set of GIS procedures to quantify, spatialize and evaluated the overlap between ecosystem services-carbon stock and sediment retention-and a biodiversity proxy-habitat quality. In addition, we proposed a method that serves as an initial approach of a priority areas selection process. The method considers the synergism between ecosystem services and biodiversity conservation. Our study region is the Iron Quadrangle, an important Brazilian mining province and a conservation priority area located in the interface of two biodiversity hotspots, the Cerrado and Atlantic Forest biomes. The resultant priority area for the maintenance of the highest values of ecosystem services and habitat quality was about 13% of the study area. Among those priority areas, 30% are already within established strictly protected areas, and 12% are in sustainable use protected areas. Following the transparent and highly replicable method we proposed in this study, conservation planners can better determine which areas fulfill multiple goals and can locate the trade-offs in the landscape. We also gave a step towards the improvement of the habitat quality model with a topography parameter. In areas of very rugged topography, we have to consider geomorfometric barriers for anthropogenic impacts and for species movement and we must think beyond the linear distances. Moreover, we used a model that considers the tree mortality caused by edge effects in the estimation of carbon stock. We found low spatial congruence among the modeled services, mostly because of the pattern of sediment retention

  17. Ecosystem Services Modeling as a Tool for Defining Priority Areas for Conservation.

    Science.gov (United States)

    Duarte, Gabriela Teixeira; Ribeiro, Milton Cezar; Paglia, Adriano Pereira

    2016-01-01

    Conservationists often have difficulty obtaining financial and social support for protected areas that do not demonstrate their benefits for society. Therefore, ecosystem services have gained importance in conservation science in the last decade, as these services provide further justification for appropriate management and conservation of natural systems. We used InVEST software and a set of GIS procedures to quantify, spatialize and evaluated the overlap between ecosystem services-carbon stock and sediment retention-and a biodiversity proxy-habitat quality. In addition, we proposed a method that serves as an initial approach of a priority areas selection process. The method considers the synergism between ecosystem services and biodiversity conservation. Our study region is the Iron Quadrangle, an important Brazilian mining province and a conservation priority area located in the interface of two biodiversity hotspots, the Cerrado and Atlantic Forest biomes. The resultant priority area for the maintenance of the highest values of ecosystem services and habitat quality was about 13% of the study area. Among those priority areas, 30% are already within established strictly protected areas, and 12% are in sustainable use protected areas. Following the transparent and highly replicable method we proposed in this study, conservation planners can better determine which areas fulfill multiple goals and can locate the trade-offs in the landscape. We also gave a step towards the improvement of the habitat quality model with a topography parameter. In areas of very rugged topography, we have to consider geomorfometric barriers for anthropogenic impacts and for species movement and we must think beyond the linear distances. Moreover, we used a model that considers the tree mortality caused by edge effects in the estimation of carbon stock. We found low spatial congruence among the modeled services, mostly because of the pattern of sediment retention distribution.

  18. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  19. Inter-library Service Brokerage in LicenseScript

    NARCIS (Netherlands)

    Chong, C.N.; Etalle, Sandro; Hartel, Pieter H.; Joosten, Rieks; Kleinhuis, Geert

    Inter-library loan involves interaction among a dynamic number of digital libraries and users. Therefore, inter-library service management is complex. We need to handle different and conflicting requirements of services from the digital libraries and users. To resolve this problem, we present the

  20. Spatial Accessibility to Health Care Services: Identifying under-Serviced Neighbourhoods in Canadian Urban Areas.

    Directory of Open Access Journals (Sweden)

    Tayyab Ikram Shah

    Full Text Available Urban environments can influence many aspects of health and well-being and access to health care is one of them. Access to primary health care (PHC in urban settings is a pressing research and policy issue in Canada. Most research on access to healthcare is focused on national and provincial levels in Canada; there is a need to advance current understanding to local scales such as neighbourhoods.This study examines spatial accessibility to family physicians using the Three-Step Floating Catchment Area (3SFCA method to identify neighbourhoods with poor geographical access to PHC services and their spatial patterning across 14 Canadian urban settings. An index of spatial access to PHC services, representing an accessibility score (physicians-per-1000 population, was calculated for neighborhoods using a 3km road network distance. Information about primary health care providers (this definition does not include mobile services such as health buses or nurse practitioners or less distributed services such as emergency rooms used in this research was gathered from publicly available and routinely updated sources (i.e. provincial colleges of physicians and surgeons. An integrated geocoding approach was used to establish PHC locations.The results found that the three methods, Simple Ratio, Neighbourhood Simple Ratio, and 3SFCA that produce City level access scores are positively correlated with each other. Comparative analyses were performed both within and across urban settings to examine disparities in distributions of PHC services. It is found that neighbourhoods with poor accessibility scores in the main urban settings across Canada have further disadvantages in relation to population high health care needs.The results of this study show substantial variations in geographical accessibility to PHC services both within and among urban areas. This research enhances our understanding of spatial accessibility to health care services at the neighbourhood

  1. The U.S. Nuclear Regulatory Commission's antitrust review of nuclear power plants: the conditioning of licenses

    International Nuclear Information System (INIS)

    Penn, D.W.; Delaney, J.B.; Honeycutt, T.C.

    1976-04-01

    The 1970 amendments to Section 105 of the Atomic Energy Act require the Nuclear Regulatory Commission to conduct a prelicensing antitrust review of applications for licenses to construct and operate nuclear power plants. The Commission must make a finding as to whether the granting of a license 'would create or maintain a situation inconsistent with the antitrust laws,' and it has the authority to issue or continue a license, to refuse to issue a license, to rescind or amend a license, and to issue a license with conditions that it deems appropriate. This report provides information about the antitrust license conditions that have resulted from the NRC's antitrust review process. The process itself is described and a catalog of the applications requiring antitrust license conditions is presented. For each application, the license conditions are put into the general categories of unit access, transmission services, coordination, and contractual provisions. For completeness, the report also catalogs applications requiring no antitrust license conditions, and lists applications that were exempted from the 1970 amendments, are the subject of litigation, or have been withdrawn

  2. Utilization of Mental Health Services by Veterans Living in Rural Areas.

    Science.gov (United States)

    Teich, Judith; Ali, Mir M; Lynch, Sean; Mutter, Ryan

    2017-06-01

    There is concern that veterans living in rural areas may not be receiving the mental health (MH) treatment they need. This study uses recent national survey data to examine the utilization of MH treatment among military veterans with a MH condition living in rural areas, providing comparisons with estimates of veterans living in urban areas. Multivariable logistic regression is utilized to examine differences in MH service use by urban/rural residence, controlling for other factors. Rates of utilization of inpatient and outpatient treatment, psychotropic medication, any MH treatment, and perceived unmet need for MH care are examined. There were significant differences in MH treatment utilization among veterans by rural/urban residence. Multivariate estimates indicate that compared to veterans with a MH condition living in urban areas, veterans in rural areas had 70% lower odds of receiving any MH treatment. Veterans with a MH condition in rural areas have approximately 52% and 64% lower odds of receiving outpatient treatment and prescription medications, respectively, compared to those living in urban areas. Differences in perceived unmet need for mental health treatment were not statistically significant. While research indicates that recent efforts to improve MH service delivery have resulted in improved access to services, this study found that veterans' rates of MH treatment are lower in rural areas, compared to urban areas. Continued efforts to support the provision of behavioral health services to rural veterans are needed. Telemedicine, using rural providers to their maximum potential, and engagement with community stakeholder groups are promising approaches. © 2016 National Rural Health Association.

  3. 47 CFR 25.147 - Licensing provision for NGSO MSS feeder downlinks in the band 6700-6875 MHz.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing provision for NGSO MSS feeder downlinks in the band 6700-6875 MHz. 25.147 Section 25.147 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space...

  4. 75 FR 66108 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-10-27

    ...; Availability for Licensing AGENCY: National Institutes of Health, Public Health Service, HHS. ACTION: Notice... immunological response to bacterial antigens in the gut microflora is thought to be involved. Present treatments... previous work, scientists at NIAID and FDA have shown that an Il-13 chimeric fusion protein linked to an...

  5. 77 FR 26294 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2012-05-03

    ...; Availability for Licensing AGENCY: National Institutes of Health, Public Health Service, HHS. ACTION: Notice.... Multiple myeloma is a malignancy of plasma cells. It is almost always incurable. A CAR is a fusion protein... mammalian cells. The toxicity thought to be a result of inhibition of multiple essential mammalian...

  6. Libraries and licensing

    Directory of Open Access Journals (Sweden)

    Maja Žumer

    2001-01-01

    Full Text Available In the mid 90s, the abundance of various electronic publications exposed libraries to the problems of licensing electronic content. Various licensing principles have been prepared recently to help libraries in the process; it can be said that in general, the knowledge of licensing issues has improved in libraries of all types. Libraries form consortia in order to gain stronger negotiating positions and obtain better conditions.In the article, new licensing principles are presented in more detail, as well as some domestic and foreign experiences with consortia forming.

  7. Retailer licensing and tobacco display compliance: are some retailers more likely to flout regulations?

    Science.gov (United States)

    Fry, Rae; Burton, Suzan; Williams, Kelly; Walsberger, Scott; Tang, Anita; Chapman, Kathy; Egger, Sam

    2017-03-01

    To assess retailer compliance with a licensing scheme requiring tobacco retailers to list their business details with the government, to examine whether listed retailers are more likely to comply with a point-of-sale (POS) display ban and other in-store retailing laws and to explore variations in compliance between different retailer types and locations. An audit of 1739 retailers in New South Wales, Australia, was used to assess compliance with tobacco retailing legislation. Auditors actively searched for and audited unlisted retailers and all listed retailers in 122 metropolitan and regional postcodes. Multivariate generalised linear regression models were used to examine associations between compliance and retailer type, remoteness and demographic characteristics (socioeconomic level, proportion of population under 18 years and proportion born in Australia). One unlisted tobacco retailer was identified for every 12.6 listed tobacco retailers. Unlisted retailers were significantly more likely than listed retailers to breach in-store retailing laws (plaws was only 73.4%. Retailers in socioeconomically disadvantaged areas had lower compliance than those in high socioeconomic areas. Some tobacco retailers did not list their business details with the government as required, even though there was no financial cost to do so. Unlisted retailers were more likely to violate in-store regulations. The results suggest licensing schemes can be useful for providing a list of retailers, thus facilitating enforcement, but require a system to search for, and respond to, unlisted/unlicensed retailers. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  8. CITY HOTSPOT: LINKAGES BETWEEN ECOSYSTEM SERVICES AND BIODIVERSITY OF URBAN GREEN AREAS

    Directory of Open Access Journals (Sweden)

    Špela Železnikar

    2017-01-01

    Full Text Available Green areas in cities and their ecosystem services (ES offer residents various benefits. The range of services depends on biodiversity of a green space. The aim was to determine the relationship between biodiversity in different categories of green areas in the city and the ecosystem services, which appear in it. We made 108 relevés in the autumn and spring time, within nine categories of green areas in the Municipality of Ljubljana. In each category the range of ES was assessed based on field analysis and compared with literature assessed ecosystem services. Results showed that the category of forests differ from others. Other categories were similar to each other, in particular grassland categories. Also, a positive relationship linkage was found - more plant species mean more assessed ecosystem services in a specific green infrastructure category.

  9. 76 FR 72713 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2011-11-25

    ...; Availability for Licensing AGENCY: National Institutes of Health, Public Health Service, HHS. ACTION: Notice... are thought to play a central role in this process. The subject invention is a novel method of... (CTLA4IgG) fusion protein to salivary glands. The system effectively blocks CTLA4 ligand interactions with...

  10. 9 CFR 2.11 - Denial of initial license application.

    Science.gov (United States)

    2010-01-01

    ... have violated any Federal, State, or local laws or regulations pertaining to animal cruelty within 1... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Denial of initial license application. 2.11 Section 2.11 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT...

  11. Why operators fail licensing examinations

    International Nuclear Information System (INIS)

    Roth, D.R.; Zerbo, J.N.

    1975-01-01

    A survey was conducted among nuclear utility operators who have taken NRC licensing examinations to determine which factors they considered important in their success or failure. The operators also compared the actual NRC examination with their expectations prior to taking the examination. The results of the survey supplement NRC statistics with regard to failure rates. Over 350 operators and 20 utilities participated in the survey and a good cross section of the nuclear community is represented. Reactor theory and emergency procedures are important areas in which operators found NRC emphasis to be different than expected. Observation Training and Design Lecture Series are two training segments which appear to require improvement. Recommendations are made for the use of data collected through this survey and for continuation of the effort to give operators a mechanism of supplying feedback to the training and licensing process

  12. Representation of Ecosystem Services by Terrestrial Protected Areas: Chile as a Case Study

    Science.gov (United States)

    Durán, América P.; Casalegno, Stefano; Marquet, Pablo A.; Gaston, Kevin J.

    2013-01-01

    Protected areas are increasingly considered to play a key role in the global maintenance of ecosystem processes and the ecosystem services they provide. It is thus vital to assess the extent to which existing protected area systems represent those services. Here, for the first time, we document the effectiveness of the current Chilean protected area system and its planned extensions in representing both ecosystem services (plant productivity, carbon storage and agricultural production) and biodiversity. Additionally, we evaluate the effectiveness of protected areas based on their respective management objectives. Our results show that existing protected areas in Chile do not contain an unusually high proportion of carbon storage (14.9%), agricultural production (0.2%) or biodiversity (11.8%), and also represent a low level of plant productivity (Normalized Difference Vegetation Index of 0.38). Proposed additional priority sites enhance the representation of ecosystem services and biodiversity, but not sufficiently to attain levels of representation higher than would be expected for their area of coverage. Moreover, when the species groups were assessed separately, amphibians was the only one well represented. Suggested priority sites for biodiversity conservation, without formal protection yet, was the only protected area category that over-represents carbon storage, agricultural production and biodiversity. The low representation of ecosystem services and species’ distribution ranges by the current protected area system is because these protected areas are heavily biased toward southern Chile, and contain large extents of ice and bare rock. The designation and management of proposed priority sites needs to be addressed in order to increase the representation of ecosystem services within the Chilean protected area system. PMID:24376559

  13. Practical issues in structuring seismic licensing and acquisition agreements

    International Nuclear Information System (INIS)

    Lawrence, M.A.

    1999-01-01

    Some issues facing the geophysical industry in the area of licensing and acquisition agreements are discussed, focusing on a very large business segment of the industry called 'non-exclusive' seismic data (commonly referred to as SPEC data). A historical perspective of the industry in the Gulf of Mexico is presented, highlighting some important aspects of data licenses. The benefits of licensing three-dimensional data to the exploration industry include: (1) economy of scale, (2) 3-D is more affordable, (3) reduced barriers to entry by independents, and (4) improved success rates and reduced risk. A list of 'SPEC' companies in the Gulf of Mexico is provided and the data licensing process is outlined. There are two basic types of seismic data use licenses. The first is for a single, one-time transaction, and the other (which is more prevalent), covers multiple use licenses contemplated over a period of time. This paper briefly outlined the meaning of some important terms usually found in a license agreement, among them ownership, rights of licensee, term, disclosure to third parties, and transfer. International 'SPEC' programs and the requirements for a successful 'SPEC' program are described. The requirements include: a stable host government, reliable, competitive system of concession offerings, long term scheduled offerings, clear, consistent, and acceptable concession terms to oil and gas companies, and consistent, fair and timely method of evaluating bids and awarding concessions. 001CA9901758

  14. Reactor licensing

    International Nuclear Information System (INIS)

    Harvie, J.D.

    2002-01-01

    This presentation discusses reactor licensing and includes the legislative basis for licensing, other relevant legislation , the purpose of the Nuclear Safety and Control Act, important regulations, regulatory document, policies, and standards. It also discusses the role of the CNSC, its mandate and safety philosophy

  15. 76 FR 60801 - Assessment of Fees for Dairy Import Licenses for the 2012 Tariff-Rate Import Quota Year

    Science.gov (United States)

    2011-09-30

    ... for the 2012 calendar year. Notice: The total cost to USDA of administering the licensing system for... administering the licensing system, and $125,280 represents other miscellaneous costs, including travel, postage... DEPARTMENT OF AGRICULTURE Foreign Agricultural Service Assessment of Fees for Dairy Import...

  16. Nuclear knowledge portal for supporting licensing and controlling nuclear activities in the Brazilian Nuclear Energy Commission

    International Nuclear Information System (INIS)

    Gomes, E.; Braga, F.

    2005-01-01

    The knowledge economy is pivotal for moving the wealth and development of traditional industrial sectors - abundant in manual labour, raw materials and capital - to areas whose products, processes and services are rich in technology and knowledge. Even in research areas such as nuclear energy, where goods are based on high technology, the ability to transform information into knowledge, and knowledge into decisions and actions, is extremely important. Therefore, the value of products from these areas depends more and more on the degree of innovation, technology and intelligence incorporated by them. Thus, it has become increasingly important and relevant to acquire strategic knowledge and make it available to the organisation. Therefore, the objective of this paper is to present the construction of a Nuclear Knowledge Portal for aiding and streamlining the Licensing and Management activities of the CNEN. (author)

  17. Nuclear knowledge portal to support licensing and control nuclear activities in the Brazilian Nuclear Energy Commission

    International Nuclear Information System (INIS)

    Gomes, M.E.; Braga, M.F.

    2004-01-01

    The Knowledge Economy is pivotal for moving the wealth and development of traditional industrial sectors - abundant in manual labor, raw materials and capital - to areas whose products, processes and services are rich in technology and knowledge. Even in research areas such as nuclear energy, where goods are based on high technology, the ability to transform information into knowledge, and knowledge into decisions and actions, is extremely important. Therefore, the value of products from these areas depends more and more on the degree of innovation, technology and intelligence incorporated by them. Thus, it has become increasingly important and relevant to acquire strategic knowledge and make it available to the organization. Therefore, the objective of this article is to present the construction of a Nuclear Knowledge Portal for aiding and streamlining the Licensing and Management activities of the CNEN. (author)

  18. Summary report on safety and licensing strategy support for the ABR prototype

    International Nuclear Information System (INIS)

    Cahalan, J. E.; Nuclear Engineering Division

    2007-01-01

    Argonne National Laboratory is providing support to the US Department of Energy in the Global Nuclear Energy Partnership (GNEP) in certification of an advanced, sodium-cooled fast reactor. The reactor is to be constructed as a prototype for future commercial power reactors that will produce electricity while consuming actinides recovered from light water reactor spent fuel. This prototype reactor has been called the Advanced Burner Reactor, or ABR, and is now often referred to as the advanced recycle reactor. As part of its activities, Argonne is providing technical services to assist definition of a safety and licensing strategy for the ABR prototype, and to further implementation of the strategy. In FY06, an organizational meeting was held for DOE and its laboratory contractors to discuss licensing alternatives and review previous licensing experience for the Fast Flux Test Facility (FFTF) and the Clinch River Breeder Reactor Plant (CRBRP). Near the end of FY06, a report summarizing the discussions and conclusions was written. One of the top-level conclusions recorded in the report was a recommendation to follow a licensing strategy that included the US Nuclear Regulatory Commission (NRC) as the regulatory review and licensing authority. In FY07, activities ar Argonne to support safety and licensing progress have continued. These activities have focused on further evaluation of licensing alternatives; assessment of design, analysis, and documentation implications of licensing paths; and initial technical interactions with the Nuclear Regulatory Commission. This report summarizes FY07 activities

  19. NRC licensing of uranium enrichment plants

    International Nuclear Information System (INIS)

    Moran, B.W.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) is preparing a rule making that establishes the licensing requirements for low-enriched uranium enrichment plants. Although implementation of this rule making is timed to correspond with receipt of a license application for the Louisiana Energy Services centrifuge enrichment plant, the rule making is applicable to all uranium enrichment technologies. If ownership of the US gaseous diffusion plants and/or atomic vapor laser isotope separation is transferred to a private or government corporation, these plants also would be licensable under the new rule making. The Safeguards Studies Department was tasked by the NRC to provide technical assistance in support of the rule making and guidance preparation process. The initial and primary effort of this task involved the characterization of the potential safeguards concerns associated with a commercial enrichment plant, and the licensing issues associated with these concerns. The primary safeguards considerations were identified as detection of the loss of special nuclear material, detection of unauthorized production of material of low strategic significance, and detection of production of uranium enriched to >10% 235 U. The primary safeguards concerns identified were (1) large absolute limit of error associated with the material balance closing, (2) the inability to shutdown some technologies to perform a cleanout inventory of the process system, and (3) the flexibility of some technologies to produce higher enrichments. Unauthorized production scenarios were identified for some technologies that could prevent conventional material control and accounting programs from detecting the production and removal of 5 kg 235 U as highly enriched uranium. Safeguards techniques were identified to mitigate these concerns

  20. Ecosystem services-based SWOT analysis of protected areas for conservation strategies.

    Science.gov (United States)

    Scolozzi, Rocco; Schirpke, Uta; Morri, Elisa; D'Amato, Dalia; Santolini, Riccardo

    2014-12-15

    An ecosystem services-based SWOT analysis is proposed in order to identify and quantify internal and external factors supporting or threatening the conservation effectiveness of protected areas. The proposed approach concerns both the ecological and the social perspective. Strengths and weaknesses, opportunities and threats were evaluated based on 12 selected environmental and socio-economic indicators for all terrestrial Italian protected areas, belonging to the Natura 2000 network, and for their 5-km buffer area. The indicators, used as criteria within a multi-criteria assessment, include: core area, cost-distance between protected areas, changes in ecosystem services values, intensification of land use, and urbanization. The results were aggregated for three biogeographical regions, Alpine, Continental, and Mediterranean, indicating that Alpine sites have more opportunities and strengths than Continental and Mediterranean sites. The results call attention to where connectivity and land-use changes may have stronger influence on protected areas, in particular, whereas urbanization or intensification of agriculture may hamper conservation goals of protected areas. The proposed SWOT analysis provides helpful information for a multiple scale perspective and for identifying conservation priorities and for defining management strategies to assure biodiversity conservation and ecosystem services provision. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. Investment issues in nuclear plant license renewal

    International Nuclear Information System (INIS)

    Eynon, R.T.

    1999-01-01

    A method that determines the operating lives for existing nuclear power plants is discussed. These assumptions are the basis for projections of electricity supply through 2020 reported in the Energy Information Administration's (EIA's) Annual Energy Outlook 1999. To determine if plants will seek license renewal, one must first determine if they will be operating to the end of their current licenses. This determination is based on an economic test that assumes an investment of $150/kW will be required after 30 yr of operation for plants with older designs. This expenditure is intended to be equivalent to the cost that would be associated with any of several needs such as a one0time investment to replace aging equipment (steam generators), a series of investments to fix age-related degradation, increases in operating costs, or costs associated with decreased performance. This investment is compared with the cost of building and operating the lowest-cost new plant over the same 10-yr period. If a plant fails this test, it is assumed to be retired after 30 yr of service. All other plants are then considered candidates for license renewal. The method used to determine if it is economic to apply for license renewal and operate plants for an additional 20 yr is to assume that plants face an investment of $250 million after 40 yr of operation to refurbish aging components. This investment is compared with the lowest-cost new plant alternative evaluated over the same 20 yr that the nuclear plant would operate. If the nuclear plant is the lowest cost option, it is projected to continue to operate. EIA projects that it would be economic to extend the operating licenses for 3.7 GW of capacity (6 units)

  2. 76 FR 40677 - Notice of Intent To Grant Exclusive License

    Science.gov (United States)

    2011-07-11

    ... Research Service, intends to grant to P & M Plastics, Inc. of Mountainair, New Mexico, an exclusive license..., 2011. ADDRESSES: Send comments to: USDA, ARS, Office of Technology Transfer, 5601 Sunnyside Avenue, Rm... of Technology Transfer at the Beltsville address given above; telephone: 301-504-5989. SUPPLEMENTARY...

  3. 76 FR 38108 - Notice of Intent to Grant Exclusive License

    Science.gov (United States)

    2011-06-29

    ... Research Service, intends to grant to P & M Signs, Inc. of Mountainair, New Mexico, an exclusive license to... July 29, 2011. ADDRESSES: Send comments to: USDA, ARS, Office of Technology Transfer, 5601 Sunnyside... Office of Technology Transfer at the Beltsville address given above; telephone: 301-504-5989...

  4. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  5. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  6. Licensing in an international triopoly

    Science.gov (United States)

    Ferreira, Fernanda A.; Ferreira, Flávio

    2011-12-01

    We study the effects of entry of two foreign firms on domestic welfare in the presence of licensing, when the incumbent is technologically superior to the entrants. We consider two different situations: (i) the cost-reducing innovation is licensed to both entrants; (ii) the cost-reducing innovation is licensed to just one of the entrants. We analyse three kind of license: (lump-sum) fixed-fee; (per-unit) royalty; and two-part tariff, that is a combination of a fixed-fee and a royalty. We prove that a two part tariff is never an optimal licensing scheme for the incumbent. Moreover, (i) when the technology is licensed to the two entrants, the optimal contract consists of a licensing with only output royalty; and (ii) when the technology is licensed to just one of the entrants, the optimal contract consists of a licensing with only a fixed-fee.

  7. Functional approach in estimation of cultural ecosystem services of recreational areas

    Science.gov (United States)

    Sautkin, I. S.; Rogova, T. V.

    2018-01-01

    The article is devoted to the identification and analysis of cultural ecosystem services of recreational areas from the different forest plant functional groups in the suburbs of Kazan. The study explored two cultural ecosystem services supplied by forest plants by linking these services to different plant functional traits. Information on the functional traits of 76 plants occurring in the forest ecosystems of the investigated area was collected from reference books on the biological characteristics of plant species. Analysis of these species and traits with the Ward clustering method yielded four functional groups with different potentials for delivering ecosystem services. The results show that the contribution of species diversity to services can be characterized through the functional traits of plants. This proves that there is a stable relationship between biodiversity and the quality and quantity of ecosystem services. The proposed method can be extended to other types of services (regulating and supporting). The analysis can be used in the socio-economic assessment of natural ecosystems for recreation and other uses.

  8. The strategy of experimental power reactor licensing in Indonesia

    International Nuclear Information System (INIS)

    Moch Djoko Birmano

    2015-01-01

    Currently, BATAN has being planned to develop Experimental Power Reactor (EPR), that is the research nuclear reactor that can generate power (electricity or heat). The EPR is planned will be built in the National Center for Research of Science and Technology (Puspiptek) area at Serpong, South Tangerang, Banten Province, with the choice of reactor types is HTGR with the power size of 10 MWth. As stated in the Act No. 10 year 1997 on Nuclear Power, that every construction and operation of nuclear reactors and other nuclear installations and decommissioning of nuclear reactors required to have a permit. Furthermore, the its implementation arrangements is regulated in Government Regulation (GR) No. 2 year 2014 on Licensing of Nuclear Installations and Nuclear Material Utilization, which contains the requirements and procedures for the licensing process since site, construction, commissioning, operation, and decommissioning, it means licensing is implemented during the activity of construction, operation and decommissioning of NPPs.While, for the more detailed licensing arrangements available in the guidelines of BAPETEN Chairman Regulation (BCR). This study was conducted to understand the legal and institutional aspects, types and stages, and the licensing process of RDE, and identify licensing strategy so that timely as planned. Methodologies used include the literature study, consultation with experts in BAPETEN, discussions in the national seminar including FGD. (author)

  9. 47 CFR 25.135 - Licensing provisions for earth station networks in the non-voice, non-geostationary mobile...

    Science.gov (United States)

    2010-10-01

    ... in the non-voice, non-geostationary mobile-satellite service. 25.135 Section 25.135 Telecommunication...-voice, non-geostationary mobile-satellite service. (a) Each applicant for a blanket earth station license in the non-voice, non-geostationary mobile-satellite service shall demonstrate that transceiver...

  10. Identification of the core ecosystem services and their spatial heterogeneity in Poyang Lake area

    Institute of Scientific and Technical Information of China (English)

    Nana SHI; Jinyan ZHAN; Feng WU; Jifu DU

    2009-01-01

    According to the ecosystem assessment framework developed by the Millennium Ecosystem Assessment (MA), this paper designs an evaluation system of ecosystem services in Poyang Lake area. On the basis of relevant variables disaggregated to 1 km grid using the gridded 1 km, this paper employs factor analysis to extract a number of factors which characterize the ecosystem services of Poyang Lake area. The extracted principal component are then represented onto 1 km ×1 km grids by spatial clustering analysis to recognize and identify the minimal but consistent mapping units for ecosystem services which can be used to delimit the boundaries of ecological service zones. The research identifies ten ecosystem service zones in Poyang Lake area according to the consistent principle of core ecosystem service unit.Four kinds of core ecosystem services including supporting function, provisioning function, regulating function and cultural function are identified and represented. The research results could provide both spatially and temporally valuable decision-making information for sustainable ecosystem management in the targeted area.

  11. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... Conditions § 431.73 Continuing accuracy of license application; application for modification of license. (a...

  12. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  13. Licensed Healthcare Facilities

    Data.gov (United States)

    California Natural Resource Agency — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  14. Regulatory Approach To and Lessons Learned with Licensing of Service Life Extension at PAKS NPP

    International Nuclear Information System (INIS)

    Petofi, G.

    2012-01-01

    Paks Nuclear Power Plant of Hungary decided to extend the original design lifetime of the plant by 20 years, which expires on December 31, 2012 concerning unit 1. The Hungarian Atomic Energy Authority established the legal environments in order to license the extension using an approach similar to that followed in the United States. The regulation specifies the pre-conditions for the extension, defines the scoping and screening process for the passive and long lived systems, structures and components to be involved in the licensing and the respective methods of treatment and also determines how the active components shall be dealt with during the extended lifetime. The regulatory procedure is a two-step process including the oversight of the preparatory programme of the operator for the extension that started 4 years before the expiry of the lifetime and the licensing process itself, which is currently under way for unit 1 after the submittal of the licensee's application at the end of 2011. The first experiences with the regulatory assessment of the application are available yet and presented in this paper. (author)

  15. 2015 Business Licenses

    Data.gov (United States)

    City of Jackson, Mississippi — This data displays all business license information for the year of 2015. This information details license classifications and status. This information will updated...

  16. The impact of reliability centered maintenance on plant prospects for license renewal

    International Nuclear Information System (INIS)

    Elliott, J.O.; Nakahara, Y.

    1991-01-01

    Much attention has been directed in recent years to means of extending nuclear power plant life. As many plants enter their third decade of service, the questions loom large of how to keep aging plants reliable, as well as how to assure reliability and safety to an extent sufficient to warrant license renewal at the end of the current licensing term. Concurrently the nuclear industry has seen a growing interest in reducing the cost and complexity of maintenance activities while at the same time improving plant reliability and availability. Attainment of these seemingly contradictory aims is being aided by the introduction of a maintenance philosophy developed originally by the airline industry and subsequently applied with great success both in that industry and the U.S. military services. Reliability Centered Maintenance (RCM), in its basic form, may be described as a consideration of reliability and maintenance problems from a systems level approach, allowing a focus on preservation of system functions as the aim of a maintenance program optimized for both safety and economics. It is this systematic view of plant maintenance, with the emphasis on preservation of overall functions rather than individual parts and components which sets RCM apart from past nuclear plant maintenance philosophies. It is also the factor which makes application of RCM an ideal first step in development of strategies for life extension and license renewal, both for aging plants, and for plants just beginning their first license term

  17. Teenagers' licensing decisions and their views of licensing policies: a national survey.

    Science.gov (United States)

    Williams, Allan F

    2011-08-01

    One objective was to determine teenage licensing rates on a national basis, interest in early licensure, and reasons for delay. A second objective was to learn teenagers' opinions about licensing policies, important in states considering ways to upgrade their current licensing systems. One thousand three hundred eighty-three 15- to 18-year-olds completed an online survey in November 2010. They were drawn from a nationally representative panel of US households recruited using probability-based sampling. The panel included cell phone-only households, and Internet access was provided to those without it. Weighting procedures were applied so that the study population represented the national US population of 15- to 18-year-olds. Most teens said that they were interested in getting a license as soon as legally possible, but many had not started the process. At 16, teens were about equally divided among those who had not started, those in the learner stage, and those with a restricted or full license. At 18, 62 percent had full licenses; 22 percent had not started. For those old enough to start, lack of a car, costs, parent availability, ability to get around without a car, and being busy with other activities were leading reasons for delay. The majority of teens were not in favor of higher licensing ages. Forty-six percent thought the minimum learner age should be 16; 30 percent thought the full license age should be 18 or older. The majority approved of night (78%) and passenger (57%) restrictions, and 85 and 93 percent endorsed cell phone and texting bans, respectively. When these policies were packaged together in a single law that included an age 16 start, night, passenger, cell phone and texting bans, and a full license at age 18, 74 percent of teens were in favor. Teenagers are not as supportive of strong licensing policies as parents of teens, but there is evidence that they will support comprehensive policies likely to lead to further reductions in teen crash

  18. AMS: Area Message Service for SLC

    International Nuclear Information System (INIS)

    Crane, M.; Mackenzie, R.; Millsom, D.; Zelazny, M.

    1993-04-01

    The Area Message Service (AMS) is a TCP/IP based messaging service currently in use at SLAC. A number of projects under development here at SLAC require and application level interface to the 4.3BSD UNIX socket level communications functions using TCP/IP over ethernet. AMS provides connection management, solicited message transfer, unsolicited message transfer, and asynchronous notification of pending messages. AMS is written completely in ANSI 'C' and is currently portable over three hardware/operating system/network manager platforms, VAX/VMS/Multinet, PC/MS-DOS/Pathworks, VME 68K/pSOS/pNA. The basic architecture is a client-server connection where either end of the interface may be the server. This allows for connections and data flow to be initiated from either end of the interface. Included in the paper are details concerning the connection management, the handling of the multi-platform code, and the implementation process

  19. Quality Assessment of Compressed Video for Automatic License Plate Recognition

    DEFF Research Database (Denmark)

    Ukhanova, Ann; Støttrup-Andersen, Jesper; Forchhammer, Søren

    2014-01-01

    Definition of video quality requirements for video surveillance poses new questions in the area of quality assessment. This paper presents a quality assessment experiment for an automatic license plate recognition scenario. We explore the influence of the compression by H.264/AVC and H.265/HEVC s...... recognition in our study has a behavior similar to human recognition, allowing the use of the same mathematical models. We furthermore propose an application of one of the models for video surveillance systems......Definition of video quality requirements for video surveillance poses new questions in the area of quality assessment. This paper presents a quality assessment experiment for an automatic license plate recognition scenario. We explore the influence of the compression by H.264/AVC and H.265/HEVC...... standards on the recognition performance. We compare logarithmic and logistic functions for quality modeling. Our results show that a logistic function can better describe the dependence of recognition performance on the quality for both compression standards. We observe that automatic license plate...

  20. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1993-11-01

    This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards

  1. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  2. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  3. 42 CFR Appendix G to Part 75 - Standards for Licensing Dental Hygienists and Dental Assistants in Dental Radiography

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Standards for Licensing Dental Hygienists and Dental Assistants in Dental Radiography G Appendix G to Part 75 Public Health PUBLIC HEALTH SERVICE...—Standards for Licensing Dental Hygienists and Dental Assistants in Dental Radiography The following section...

  4. License to build

    International Nuclear Information System (INIS)

    Huntelaar, Mark; Vos, Renate de; Roobol, Lars

    2007-01-01

    Full text: A new license under the nuclear power act is applied for at the Dutch Government for the building of a High Active Repackaging Unit (HAVA-VU in Dutch) at NRG in Petten, The Netherlands. This new building is necessary to comply with our nuclear license to dispose of high active nuclear waste at Petten to the intermediate storage facility (COVRA). In the first part of this paper attention is given to the formal procedure followed by the Government, what type of documents are to be submitted, what time frames are followed, how citizen participation is organized, and as final result a new license. In the second part more detailed information is given about the present license renewal needed for the High Active Repackaging Unit

  5. License renewal demonstration program: NRC observations and lessons learned

    International Nuclear Information System (INIS)

    Prato, R.J.; Kuo, P.T.; Newberry, S.F.

    1996-12-01

    This report summarizes the Nuclear Regulatory Commission staff's observations and lessons learned from the five License Renewal Demonstration Program (LRDP) site visits performed by the staff from March 25, 1996, through August 16, 1996. The LRDP was a Nuclear Energy Institute (NEI) program intended to assess the effectiveness of the guidance provided by NEI 95-10, Revision 0, open-quotes Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule,close quotes to implement the requirements of Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), open-quotes Requirements for Renewal of Operating Licenses for Nuclear Power Plants.close quotes In general, NEI 95-10 appeared to contain the basic guidance needed for scoping, screening, identifying aging effects, developing aging management programs, and performing time-limited aging analyses. However, inconsistent implementation of this guidance in some areas was an indication that clarification of existing guidance and/or the inclusion-of some new guidance may be needed for applicants to develop a license renewal program that is consistent with the intent of the rule

  6. 7 CFR 51.52 - Licensing and identification of certain official devices.

    Science.gov (United States)

    2010-01-01

    ... MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 FRESH FRUITS, VEGETABLES AND OTHER PRODUCTS 1,2... similar aid under such terms and conditions as may be specified by the Administrator. Licenses shall be...

  7. 76 FR 59682 - Desert Southwest Customer Service Region-Western Area Lower Colorado Balancing Authority-Rate...

    Science.gov (United States)

    2011-09-27

    ... DEPARTMENT OF ENERGY Western Area Power Administration Desert Southwest Customer Service Region... CONTACT: Mr. Jack Murray, Rates Manager, Desert Southwest Customer Service Region, Western Area Power... Customer Service Region Network Integration Transmission Service Rate Schedules PD-NTS3 and INT-NTS3 for P...

  8. Evaluation of Terminated Nuclear Material Licenses

    International Nuclear Information System (INIS)

    Spencer, K.M.; Zeighami, E.A.

    1999-01-01

    This report presents the results of a six-year project that reviewed material licenses that had been terminated during the period from inception of licensing until approximately late-1994. The material licenses covered in the review project were Part 30, byproduct material licenses; Part 40, source material licenses; and Part 70, special nuclear material licenses. This report describes the methodology developed for the project, summarizes the findings of the license file inventory process, and describes the findings of the reviews or evaluations of the license files. The evaluation identified nuclear material use sites that need review of the licensing material or more direct follow-up of some type. The review process also identified licenses authorized to possess sealed sources for which there was incomplete or missing documentation of the fate of the sources

  9. Nuclear regulation. License renewal questions for nuclear plants need to be resolved

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Kruslicky, Mary Ann; McDowell, William D. Jr.; Coleman, Robert L.

    1989-04-01

    A December 1986 pipe rupture at Virginia Power's Surry unit 2 nuclear power plant injured eight workers; four later died. As a result of this accident, Representative Edward J. Markey requested GAO to examine the Surry accident and assess the problems confronting aging nuclear plants. In March 1988 we reported our findings concerning the accident and a July 1987 incident at the Trojan nuclear plant in Oregon. This report addresses problems confronting aging nuclear plants by examining the Nuclear Regulatory Commission's (NRC) program to develop a license renewal policy and accompanying regulations, and the initiatives underway by the Department of Energy (DOE) and the electric utility industry to extend the operating lives of these plants. Nuclear power has become second only to coal as the largest producer of electricity in the United States. The 110 nuclear plants currently in service are operated by 54 utilities, provide about 20 percent of the nation's electricity, and represent a capital investment of over $200 billion. The Atomic Energy Act authorizes NRC to issue nuclear plant operating licenses for up to 40 years and provides for license extensions beyond the initial operating period. The act does not, however, stipulate the criteria for evaluating a utility request to operate a nuclear plant longer than 40 years. The oldest operating license currently in effect will expire in the year 2000. According to NRC, about one-half of the existing operating licenses will terminate by the year 2015, and most licenses will expire by about 2030. Many utilities will have to decide in the early 1990s whether to continue operating older nuclear plants or to construct new generating capacity. A clear understanding of the terms and conditions governing the license renewal process will be a key element in deciding how to meet future electricity demand. Although NRC has developed 3 possible license renewal policy options and identified 15 areas of regulatory uncertainty that

  10. 75 FR 32773 - Auction of 218-219 MHz Service and Phase II 220 MHz Service Licenses Scheduled for December 7...

    Science.gov (United States)

    2010-06-09

    ..., depending upon the bidding activity for the license. Equations and examples are shown in Attachment B of the.... Balancing the potential need for bidders to use withdrawals to avoid winning incomplete combinations of...

  11. Contestable Licensing

    OpenAIRE

    Zvika Neeman; Gerhard O. Orosel

    2000-01-01

    We analyze a model of repeated franchise bidding for natural monopoly with contestable licensing - a franchisee halds an (exclusive) license to operate a franchise until another rm offers to pay more for it. In a world where quality is observable but not veri able, the simple regulatory scheme we describe combines market-like incentives with regulatory oversight to generate efficient outcomes.

  12. AMS: Area Message Service for SLC

    International Nuclear Information System (INIS)

    Crane, M.; Mackenzie, R.; Millsom, D.; Zelazny, M.

    1993-01-01

    The Area Message Service (AMS) is a TCP/IP based messaging service currently in use at SLAC. A number of projects under development here at SLAC require an application level interface to the 4.3BSD UNIX socket level communications functions using TCP/IP over ethernet. AMS provides connection management, solicited message transfer, unsolicited message transfer, and asynchronous notification of pending messages. AMS is written completely in ANSI open-quote C close-quote and is currently portable over three hardware/operating system/network manager platforms, VAX/VMS/Multinet, PC/MS-DOS/Pathworks, VME 68K/pSOS/pNA. The basic architecture is a client-server connection where either end of the interface may be the server. This allows for connections and data flow to be initiated from either end of the interface. Included in the paper are details concerning the connection management, the handling of the multi-platform code, and the implementation process

  13. Mapping optimal areas of ecosystem services potential in Vilnius (Lithuania)

    Science.gov (United States)

    Pereira, Paulo; Depellegrin, Daniel; Misiune, Ieva; Cerda, Artemi

    2016-04-01

    Maps are fundamental to understand the spatial pattern of natural and human impacts on the landscape (Brevik et al., 2016; Lavado Contador et al., 2009; Pereira et al., 2010a,b). Urban areas are subjected to an intense human pressure (Beniston et al., 2015), contributing to the degradation of the ecosystems, reducing their capacity to provide services in quality and quantity (Requier-Desjardins et al., 2011; Zhang et al., 2011). Environments that can provide a high number and quality of ecosystem services (ES) must be identified and managed correctly, since are spaces that can mitigate the impacts of human settlements and improve their quality. thus is of major importance have identify the areas that can provide better ES (Deppelegrin and Pereira, 2015). The aim of this work is to identify areas with high ES potential in Vilnius city. Here, we identified a total of 4 different land uses, agricultural areas (32.48%), water bodies (1.46%), forest and semi-natural (31.91%) areas and artificial surfaces (34.16%). CORINE land cover 2006 was used as base information to classify ES potential. The assessment of each land cover potential was carried out using expert assessment. Each land use type was ranked from 0 (no potential) to 5 (High potential). In this work the sum of total regulating, providing and cultural ES were assessed. The areas with optimal ES were the ones with the sum of all ranks equal or higher than the 3rd Quartil of each distribution. After identifying these areas, data was mapped using ArcGIS software. The results showed that on average Vilnius city has a higher potential for regulating services (20.35±15.92), followed by cultural (14.43±8.81) and providing (14.26±8.87). There was a significant correlation among the different type of services. Regulating vs cultural (0.92, p<0.001), regulating vs providing (0.72, p<0.001) and providing vs cultural (0.65, p<0.001). The results of Morans I autocorrelation index showed that regulating (Z-score: 10

  14. High-voltage shared-service line in the Stuttgart area

    Energy Technology Data Exchange (ETDEWEB)

    Goerler, W; Benz, A [Technische Werke der Stadt Stuttgart A.G. (F.R. Germany)

    1976-01-01

    In congested areas the line construction engineer has to cope with a great variety of difficulties - amenity problems, line crossings, and road crossings. The authors describe the prerequisites for and the construction of a HV shared-service line of approx. 25 km in the congested area of Stuttgart, where several three-phase and single- phase a.c. systems are run on one set of pylons.

  15. Renewing the licenses of US nuclear plants: An assessment of the socioeconomic impacts

    International Nuclear Information System (INIS)

    Schweitzer, M.; Saulsbury, J.W.; Schexnayder, S.M.

    1993-01-01

    In recent years, increased national attention has been focused on the potential effects of renewing, or not renewing, the licenses of nuclear power plants as the oldest of them approach the end of the 40-year operating period allowed by their original licenses. As part of a larger study for the US Nuclear Regulatory commission (NRC), the authors conducted an assessment of the potential socioeconomic impacts to those communities throughout the country in which nuclear power plants are located and which, therefore, are most directly affected by renewal of nuclear power plant licenses. This paper focuses on six key issues that are traditionally considered essential in the assessment of social impacts: Population; housing; tax payments; local public services; land use and development; and economic structure

  16. Completion of decommissioning: Monitoring for site release and license termination

    International Nuclear Information System (INIS)

    Boing, L.E.

    1997-01-01

    To request termination of a license upon completion of dismantling or decommissioning activities, documenting any residual radioactivity to show that the levels are environmentally acceptable will be necessary. When the regulators approve the decommissioning plan, they establish what the release criteria for the decommissioned site will be at the time of the site release and license termination. The criteria are numeric guidelines for direct radiation in soils and on surfaces. If the regulatory body finds that the measured on-site values are below the guidelines, the site will be acceptable for unrestricted release (no radiological controls or future use). If areas are found above those values, more decontamination or cleanup of these areas may be required unless the regulatory body grants an exemption

  17. 76 FR 56489 - Request for a License To Export Radioactive Waste

    Science.gov (United States)

    2011-09-13

    ... NUCLEAR REGULATORY COMMISSION Request for a License To Export Radioactive Waste Pursuant to 10 CFR... quantity End use country Duratek Services, Inc., August Class A radioactive Radionuclide Non-conforming Canada. 17, 2011, August 18, 2011, waste in the form reallocation: materials XW010/02, 11005620. of...

  18. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  19. Radiation control through licensing and intensive training

    International Nuclear Information System (INIS)

    Cheng, C.-H.; Yang, Y.-C.; Wu, T.-Y.; Weng, P.-S.

    1982-01-01

    Various types of intensive training courses to suit radiation workers in different fields were sponsored by both the Atomic Energy Council of Executive Yuan and the National Health Administration of Executive Yuan, Republic of China during the past seven years. During the years 1974-79, the number of radiation workers attending each training course, their age, sex and educational background are presented in detail. The typical course contents for both medical and non-medical radiation workers are given. A summary of the percentage of passes and failures of the final examination given at the end of each training course is also given. The present status of licensing for radiation facilities and workers is described, and its results are indicated. The successful control of ionizing radiation through this kind of intensive training and licensing is evidenced in the film badge records given by a centralized service laboratory located at the National Tsing Hua University. (author)

  20. Determination of ABOS 1-3+ system components belonging to the scope of license application of Paks Nuclear Power Plant Unit 1 for extension of service life, designated for the review, and verification of completeness of the scope

    International Nuclear Information System (INIS)

    Biro, Agnes Janosine; Tanits, Katalin Baumann-ne; Gosi, Peter; Kovacs, Andras; Ratkai, Sandor

    2012-01-01

    It is one major requirement of licensing the extension of design service life to determine the systems, structures and components that belong to the scope of licensing. According to the domestic regulatory requirements the ABOS 1-3 safety class components, the non safety system components of seismic safety class 3 and those non safety class components whose failure would occur due to its unmanaged ageing process and which may jeopardize safety class components with the released medium shall be involved into the scope of licensing of service life extension (SLE). In the task the components for the scope of SLE licensing of Unit 1 was determined using and, if necessary, further developing the tools provided by and exploiting, verifying and, as appropriate, supplementing the data included in the central technical database (IMR/MDM) of the NPP. As basis for determination of the scope the systems, structures and individual components categorized into safety class in the Final Safety Report were taken. Digitalized mechanical technological schemes were also used in determining the components of the systems fulfilling safety functions and in verifying the completeness. In order to assign the components belonging to the fulfillment of the function of the systems and to review the scope, the digitalization of the ABOS 2-3 electric and the ABOS 2 I and C circuit diagrams and distributor single-line diagrams and the processing and analysis of the digitalized data was performed. The ABOS + scope components were verified by walkdown. The completed component lists were compared to the components of the SLE licensing scope of the IMR/MDM database and the necessary supplementation, correction of the IMR/MDM data was also performed. In order to identify the components requiring review during licensing, also the active/passive safety function fulfillment modes were determined for every component of the licensing scope for Unit 1, which is now regarded as complete. As the results of

  1. 7 CFR 56.10 - Who may be licensed and authorized.

    Science.gov (United States)

    2010-01-01

    ... person to act as a “quality assurance inspector” in the packaging and grade labeling of products. No... (CONTINUED) VOLUNTARY GRADING OF SHELL EGGS Grading of Shell Eggs Licensed and Authorized Graders § 56.10 Who... determined by an examination for competency and who is to perform grading service under this part, may be...

  2. 31 CFR 596.306 - License.

    Science.gov (United States)

    2010-07-01

    ... ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.306 License. Except as otherwise specified, the term license means any license or...

  3. Understanding Licensing Behavior

    DEFF Research Database (Denmark)

    Cabaleiro, Goretti; Moreira, Solon; Reichstein, Toke

    The potential for rent dissipation has been argued to be the main cause of firms? licensing out behavior being stifled.However, this aspect has been scarcely studied empirically. We draw on rent dissipation arguments, and hypothesize that firms suffering from the not-invented-here (NIH) syndrome......, firms in competitive product markets, and firms that have incurred substantial sunk cost are associated with lower rates of technology out-licensing. We also posit that sunk costs negatively moderate the relationship between competition in the licensor?s product market, and licensing rate. We test our...

  4. Safeguards at NRC licensed facilities: Are we doing enough

    International Nuclear Information System (INIS)

    Asselstine, J.K.

    1986-01-01

    The Nuclear Regulatory Commission is pursuing a number of initiatives in the safeguards area. The Commission is conducting a reassessment of its safeguards design basis threat statements to consider the possible implications of an explosive-laden vehicle for U.S. nuclear safeguards and to examine the comparability of safeguards features at NRC-licensed and DOE facilities. The Commission is also completing action on measures to protect against the sabotage threat from an insider at NRC-licensed facilities, and is examining the potential safety implications of safeguards measures. Finally, the NRC has developed measures to reduce the theft potential for high-enriched uranium

  5. 75 FR 27842 - Request for a License to Export Radioactive Waste

    Science.gov (United States)

    2010-05-18

    ... NUCLEAR REGULATORY COMMISSION Request for a License to Export Radioactive Waste Pursuant to 10 CFR... Duratek Services, Inc. (a Class A Approximately 680 Storage or Canada. subsidiary of radioactive pounds (53 cubic disposal by the EnergySolutions), April 19, waste in the feet) of dry original 2010, April...

  6. Engaging Mission: Applying the Catholic Social Tradition to Investing and Licensing

    Science.gov (United States)

    Purcell, Bill; Rose, Margarita

    2018-01-01

    Faced with economic and demographic challenges, Catholic colleges and universities use endowment and licensing revenues to supplement tuition income in order to serve their missions of educating students of all socio-economic classes to promote the common good through their professional careers and service to the community. Licensees sometimes…

  7. An examination of the perceived teaching competencies of novice alternatively licensed and traditionally licensed high school science teachers

    Science.gov (United States)

    Shea, Kathleen A.

    In most states, there are two routes to teacher licensure; traditional and alternative. The alternative route provides an accelerated entry into the classroom, often without the individual engaging in education coursework or a practicum. No matter the route, teaching skills continue to be learned by novice teachers while in the classroom with the guidance of a school-based mentor. In this study, the perceptions of mentor teachers of traditionally and alternatively licensed high school science teachers were compared with respect to mentees' science teaching competency. Further, the study explored the novice teachers' self-perception of their teaching competency. A survey, consisting of 56 Likert-type questions, was completed by mentors (N = 79) and novice high school science teachers (N = 83) in six northeastern states. The results revealed a statistically significant difference in the perceptions of the mentors of traditionally and alternatively licensed novice high school science teachers in the areas of general pedagogical knowledge, pedagogical content knowledge and professional growth, with more favorable perceptions recorded by mentors of traditionally licensed science teachers. There were no differences in the perceptions of the mentors with respect to novice high school teachers' content knowledge. There was no statistical difference in the self-perceptions of competency of the novice teachers. While alternative routes to licensure in science may be a necessity, the results of this study indicate that the lack of professional preparation may need to be addressed at the school level through the agency of the mentor. This study indicates that mentors must be prepared to provide alternatively licensed novice teachers with different assistance to that given to traditionally licensed novice teachers. School districts are urged to develop mentoring programs designed to develop the teaching competency of all novice teachers regardless of the route that led them

  8. SSM's licensing review of a spent nuclear fuel repository in Sweden

    International Nuclear Information System (INIS)

    Dverstorpand, Bjoern; Stroemberg, Bo

    2014-01-01

    On 16 March 2011 the Swedish Nuclear Fuel and Waste Management Co. (SKB) submitted license applications for a general license to construct, possess and operate a KBS-3 type spent nuclear fuel repository at the Forsmark site, in Oesthammar municipality, and an encapsulation plant in Oskarshamn municipality. The KBS-3 method, which has been developed by SKB over a period of more than 30 years, entails disposing of the spent fuel in copper canisters, surrounded by a swelling bentonite clay, at about 500 m depth in crystalline basement rock. SKB's applications are being evaluated in parallel by the Swedish Radiation Safety Authority (SSM) according to the Act on Nuclear Activities and by the Land and Environmental Court according to the Environmental Code. During the review SSM will act as an expert review body to the Land and Environmental Court in the areas of radiation protection, safety and security/non-proliferation. Both SSM and the court will produce a statement with a recommendation regarding a licensing decision and licensing conditions to the government. The government will make the final decision after consulting the municipalities concerned by SKB's facilities (municipal veto applies). The current licensing decision is just one of several licensing decisions that will be required for the repository. However it is arguably the most important one, because it is the last licensing stage with a broad societal involvement including an environmental impact assessment (EIA) process, national consultations and municipal veto for the concerned municipalities. The licensing steps to follow, should SKB be granted a license by the government, only require approval by SSM. These steps include application for start of actual construction work, test operation and routine operation. (authors)

  9. FOSS License Selection and Code Management

    OpenAIRE

    Vescuso, Peter

    2011-01-01

    With nearly 2,000 free and open source software (FLOSS) licenses, software license proliferation¿ can be a major headache for software development organizations trying to speed development through software component reuse, as well as companies redistributing software packages as components of their products. Scope is one problem: from the Free Beer license to the GPL family of licenses to platform-specific licenses such as Apache and Eclipse, the number and variety of licenses make it difficu...

  10. 78 FR 78398 - Notice and Request for Comments: LSC merger of the migrant service areas in Texas, Arkansas...

    Science.gov (United States)

    2013-12-26

    ... LEGAL SERVICES CORPORATION Notice and Request for Comments: LSC merger of the migrant service... Services Corporation. ACTION: Notice and Request for Comments--LSC merger of the migrant service areas in... Alabama migrant service areas. Grants for these individual service areas have been awarded to Texas Rio...

  11. Primary care perceptions of neurology and neurology services.

    Science.gov (United States)

    Loftus, Angela M; Wade, Carrie; McCarron, Mark O

    2016-06-01

    Neurophobia (fear of neural sciences) and evaluation of independent sector contracts in neurology have seldom been examined among general practitioners (GPs). A questionnaire determined GPs' perceptions of neurology compared with other medical specialties. GP experiences of neurology services with independent sector companies and the local National Health Service (NHS) were compared. Areas of potential improvement in NHS neurology services were recorded from thematic analyses. Among 76 GPs neurology was perceived to be as interesting as other medical specialties. GPs reported less knowledge, more difficulty and less confidence in neurology compared with other medical specialties. There was a preference for a local NHS neurology service (pneurology services provided better patient satisfaction. GPs prefer local NHS neurology services to independent sector contracts. GPs' evaluations should inform commissioning of neurology services. Combating neurophobia should be an integral part of responsive commissioning. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  12. Learning-by-Licensing: How Chinese Firms Benefit From Licensing-In Technologies

    DEFF Research Database (Denmark)

    Wang, Yuandi; Roijakkers, N.; Vanhaverbeke, W.

    2012-01-01

    This paper explores how interfirm variations in their in-licensed technology portfolios influence subsequent innovation performance. Existing studies mainly assume licensed technologies are homogeneously accessible to firms, and a prevailing explanation as to why firms vary in their innovation pe...

  13. 47 CFR 22.912 - Service area boundary extensions.

    Science.gov (United States)

    2010-10-01

    ... cellular market or in the Gulf of Mexico Coastal Zone (GMCZ), to allow one or more SAB extensions into the... of the cellular market boundary, but within the service area as calculated using the methods of § 22... section, SABs may be extended into adjacent cellular markets if such extensions are de minimis, are...

  14. Benefits of restoring ecosystem services in urban areas

    Science.gov (United States)

    T. Elmqvist; H. Setala; S.N. Handel; S. van der Ploeg; J. Aronson; J.N. Blignaut; E. Gomez-Baggethun; D.J. Nowak; J. Kronenberg; R. de Groot

    2015-01-01

    Cities are a key nexus of the relationship between people and nature and are huge centers of demand for ecosystem services and also generate extremely large environmental impacts. Current projections of rapid expansion of urban areas present fundamental challenges and also opportunities to design more livable, healthy and resilient cities (e.g. adaptation to climate...

  15. Extending Service Area of IEEE 802.11 Ad Hoc Networks

    Science.gov (United States)

    Choi, Woo-Yong

    2012-06-01

    According to the current IEEE 802.11 wireless LAN standards, IEEE 802.11 ad hoc networks have the limitation that all STAs (Stations) are in the one-hop transmission range of each other. In this paper, to alleviate the limitation of IEEE 802.11 ad hoc networks we propose the efficient method for selecting the most appropriate pseudo AP (Access Point) from among the set of ad hoc STAs and extending the service area of IEEE 802.11 ad hoc networks by the pseudo AP's relaying the internal traffic of IEEE 802.11 ad hoc networks. Numerical examples show that the proposed method significantly extends the service area of IEEE 802.11 ad hoc networks.

  16. 78 FR 9747 - Request To Amend A License To Import; Radioactive Waste

    Science.gov (United States)

    2013-02-11

    ... NUCLEAR REGULATORY COMMISSION Request To Amend A License To Import; Radioactive Waste Pursuant to... Country from application no.; docket no. Diversified Scientific Class A radioactive Up to 378,000 Volume reduction...... Canada Services, Inc.; January 10, mixed waste kilograms. Amend to: (1) add four 2013...

  17. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  18. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  19. Trends in nuclear licensing

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, N W [Council for Nuclear Safety, Hennopsmeer, Pretoria (South Africa)

    1990-06-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  20. Trends in nuclear licensing

    International Nuclear Information System (INIS)

    Dalton, N.W.

    1990-01-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  1. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  2. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  3. Interim licensing criteria for physical protection of certain storage of spent fuel

    International Nuclear Information System (INIS)

    Dwyer, P.A.

    1994-11-01

    This document presents interim criteria to be used in the physical protection licensing of certain spent fuel storage installations. Installations that will be reviewed under this criteria are those that store power reactor spent fuel at decommissioned power reactor sites; independent spent fuel storage installations located outside of the owner controlled area of operating nuclear power reactors; monitored retrievable storage installations owned by the Department of Energy, designed and constructed specifically for the storage, of spent fuel; the proposed geologic repository operations area; or permanently shutdown power reactors still holding a Part 50 license. This criteria applies to both dry cask and pool storage. However, the criteria in this document does not apply to the storage of spent fuel within the owner-controlled area of operating nuclear power reactors

  4. Westinghouse AP1000 licensing maturity

    International Nuclear Information System (INIS)

    Schulz, T.; Vijuk, R.P.

    2005-01-01

    The Westinghouse AP1000 Program is aimed at making available a nuclear power plant that is economical in the U.S deregulated electrical power industry in the near-term. The AP1000 is two-loop 1000 MWe pressurizer water reactor (PWR). It is an up rated version of the AP600. The AP1000 uses passive safety systems to provide significant and measurable improvements in plant simplification, safety, reliability, investment protection and plant costs. The AP1000 uses proven technology, which builds on over 35 years of operating PWR experience. The AP1000 received Final Design Approval by the United States Nuclear Regulatory Commission (U.S. NRC) in September 2004. The AP1000 meets the US utility requirements. The AP1000 and its sister plant the AP600 have gone through a very through and complete licensing review. This paper describes the U.S. NRC review efforts of both the AP600 and the AP1000. The detail of the review and the independent calculations, evaluations and testing is discussed. The AP600 licensing documentation was submitted in 1992. The U.S. NRC granted Final Design Approval in 1999. During the intervening 7 years, the U.S. NRC asked thousands of questions, performed independent safety analysis, audited Westinghouse calculations and analysis, and performed independent testing. The more significant areas of discussion will be described. For the AP1000 Westinghouse first engaged the U.S. NRC in pre-certification discussions to define the extent of the review required, since the design is so similar to the AP600. The AP1000 licensing documentation was submitted in March 2002. The U.S. NRC granted Final Design Approval in September 2004. During the intervening 2 1/2 years, the U.S. NRC asked hundreds of questions, performed independent safety analysis, audited Westinghouse calculations and analysis, and performed independent testing. The more significant areas of discussion will be described. The implications of this review and approval on AP1000 applications in

  5. Radioisotope thermoelectric generator licensed hardware package and certification tests

    International Nuclear Information System (INIS)

    Goldmann, L.H.; Averette, H.S.

    1994-01-01

    This paper presents the Licensed Hardware package and the Certification Test portions of the Radioisotope Thermoelectric Generator Transportation System. This package has been designed to meet those portions of the Code of Federal Regulations (10 CFR 71) relating to ''Type B'' shipments of radioactive materials. The detailed information for the anticipated license is presented in the safety analysis report for packaging, which is now in process and undergoing necessary reviews. As part of the licensing process, a full-size Certification Test Article unit, which has modifications slightly different than the Licensed Hardware or production shipping units, is used for testing. Dimensional checks of the Certification Test Article were made at the manufacturing facility. Leak testing and drop testing were done at the 300 Area of the US Department of Energy's Hanford Site near Richland, Washington. The hardware includes independent double containments to prevent the environmental spread of 238 Pu, impact limiting devices to protect portions of the package from impacts, and thermal insulation to protect the seal areas from excess heat during accident conditions. The package also features electronic feed-throughs to monitor the Radioisotope Thermoelectric Generator's temperature inside the containment during the shipment cycle. This package is designed to safely dissipate the typical 4500 thermal watts produced in the largest Radioisotope Thermoelectric Generators. The package also contains provisions to ensure leak tightness when radioactive materials, such as a Radioisotope Thermoelectric Generator for the Cassini Mission, planned for 1997 by the National Aeronautics and Space Administration, are being prepared for shipment. These provisions include test ports used in conjunction with helium mass spectrometers to determine seal leakage rates of each containment during the assembly process

  6. Licensing issues associated with the use of computers in the nuclear industry

    International Nuclear Information System (INIS)

    Ehrenberger, W.D.; Bloomfield, R.E.

    1987-01-01

    Computers are increasingly important to ensuring the safety of nuclear power stations. They have been proposed or introduced into operator information systems, operational control systems, as well as into systems for core protection and plant protection. Although the developments in the individual countries are not at the same pace, they do tend to render similar results. Particular licensing problems arise because of the increasing complexity of computer systems and the software involved. In the past licensing has been closely connected with the mental understanding of the systems to be licensed. This understanding is endangered with greater complexity of the systems. Although several ''manual'' methods of licensing exist, the problem of cost effective licensing is still more or less unsolved. For the future it is expected that tools will reduce the licensing efforts leaving the licenser and assessor free to concentrate on the most important issues. Such tools will probably make use of artificial intelligence techniques. They will enable the inclusion of more complex functions into safety systems and thereby increase the number of safety criteria and the number of echelons od defense. Another important use of artificial intelligence techniques will be the area of operator information systems and maintenance, including computer hardware maintenance. They will provide early detection of problems in the plant and thereby largely enhance plant availability and safety. Further studies are being proposed in the fields of software licensing tools, artificial intelligence, fail-safe and fault-tolerant software architectures, test procedures and system specification

  7. Sustainable sewerage servicing options for peri-urban areas with failing septic systems.

    Science.gov (United States)

    Sharma, A K; Tjandraatmadja, G; Grant, A L; Grant, T; Pamminger, F

    2010-01-01

    The provision of water and wastewater services to peri-urban areas faces very different challenges to providing services to cities. Sustainable solutions for such areas are increasingly being sought, in order to solve the environmental and health risks posed by failing septic systems. These solutions should have the capability to reduce potable water demand, provide fit for purpose reuse options, and minimise impacts on the local and global environment. A methodology for the selection of sustainable sewerage servicing systems and technologies is presented in this paper. This paper describes the outcomes of applying this methodology to a case study in rural community near Melbourne, Australia, and describes the economic and environmental implications of various sewerage servicing options. Applying this methodology has found that it is possible to deliver environmental improvements at a lower community cost, by choosing servicing configurations not historically used by urban water utilities. The selected solution is currently being implemented, with the aim being to generate further transferable learnings for the water industry.

  8. Metropolitian area network services comprised of virtual local area networks running over hybrid fiber-coax and asynchronous transfer mode technologies

    Science.gov (United States)

    Biedron, William S.

    1995-11-01

    Since 1990 there has been a rapid increase in the demand for communication services, especially local and wide area network (LAN/WAN) oriented services. With the introduction of the DFB laser transmitter, hybrid-fiber-coax (HFC) cable plant designs, ATM transport technologies and rf modems, new LAN/WAN services can now be defined and marketed to residential and business customers over existing cable TV systems. The term metropolitan area network (MAN) can be used to describe this overall network. This paper discusses the technical components needed to provision these services as well as provides some perspectives on integration issues. Architecture at the headend and in the backbone is discussed, as well as specific service definitions and the technology issues associated with each. The TCP/IP protocol is suggested as a primary protocol to be used throughout the MAN.

  9. Licensing considerations in converting NRC-licensed non-power reactors from high-enriched to low-enriched uranium fuels

    International Nuclear Information System (INIS)

    Carter, R.E.

    1985-01-01

    During the mid-1970s, there was increasing concern with the possibility that highly enriched uranium (HEU), widely used in non-power reactors around the world, might be diverted from its intended peaceful uses. In 1982 the U.S. Nuclear Regulatory Commission (NRC) issued a policy statement that was intended to conform with the perceived international thinking, and that addressed the two relevant areas in which NRC has statutory responsibility, namely, export of special nuclear materials for non-USA non-power reactors, and the licensing of USA-based non-power reactors not owned by the Federal government. To further address the second area, NRC issued a proposed rule for public comment that would require all NRC-licensed non-power reactors using HEU to convert to low enriched uranium (LEU) fuel, unless they could demonstrate a unique purpose. Currently the NRC staff is revising the proposed rule. An underlying principle guiding the staff is that as long as a change in enrichment does not lead to safety-related reactor modifications, and does not involve an unreviewed safety question, the licensee could convert the core without prior NRC approval. At the time of writing this paper, a regulatory method of achieving this principle has not been finalized. (author)

  10. Licensing considerations in converting NRC-licensed non-power reactors from high-enriched to low-enriched uranium fuels

    Energy Technology Data Exchange (ETDEWEB)

    Carter, R E

    1985-07-01

    During the mid-1970s, there was increasing concern with the possibility that highly enriched uranium (HEU), widely used in non-power reactors around the world, might be diverted from its intended peaceful uses. In 1982 the U.S. Nuclear Regulatory Commission (NRC) issued a policy statement that was intended to conform with the perceived international thinking, and that addressed the two relevant areas in which NRC has statutory responsibility, namely, export of special nuclear materials for non-USA non-power reactors, and the licensing of USA-based non-power reactors not owned by the Federal government. To further address the second area, NRC issued a proposed rule for public comment that would require all NRC-licensed non-power reactors using HEU to convert to low enriched uranium (LEU) fuel, unless they could demonstrate a unique purpose. Currently the NRC staff is revising the proposed rule. An underlying principle guiding the staff is that as long as a change in enrichment does not lead to safety-related reactor modifications, and does not involve an unreviewed safety question, the licensee could convert the core without prior NRC approval. At the time of writing this paper, a regulatory method of achieving this principle has not been finalized. (author)

  11. Consolidated progress report for 1976 on nuclear data activities in the NDS service area

    International Nuclear Information System (INIS)

    1977-10-01

    A consolidated progress report for 1976 prepared for countries in the NDS service area. It is intended to encourage a closer relationship between Member States and provide for a wider circulation of unpublished progress reports from countries within the Nuclear Data Section service area

  12. Report on the service quality incentive regulations for gas network operators and ERDF. 2009-2010 Report Synthesis

    International Nuclear Information System (INIS)

    2010-11-01

    The latest natural gas transmission network tariffs, called 'ATRT4', and the tariffs for natural gas distribution network, 'ATRD3', as well as the 3. tariffs for using the public electricity networks, 'TURPE 3', constitute a regulatory framework offering incentives to gas transmission and distribution operators, as well as the electricity distributor ERDF, to control their costs and improve the quality of service provided for network users. For gas and electricity distribution system operators (DSO), the incentive-based regulation for quality of service implemented through the tariffs is complementary to the supervision powers of the licensing authorities. It operates by means of concession contracts which imply that the concessionaire has to deliver activity reports and that the licensing authorities have to publish monitoring reports of the concessionaire's activity. The licensing authorities act on the local level, whereas the incentive regulation is of national scope. The actions of the licensing authorities and of the Energy Regulatory Commission (CRE) contribute together to assess and enhance the quality of service of the DSO. As the service quality monitoring exercises are conducted successively, the analysis will become more refined as a greater data history is acquired. The quality of service from the gas network operators (GrDF, GRTgaz and TIGF) and the electricity distributor (ERDF) has been improving gradually over the period of the monitoring, or has stabilised at a satisfactory level for the areas that are most important for the correct functioning of the market. Some objectives set by the tariffs have been met or even exceeded, which earns financial bonuses for the operators in question. This second service quality monitoring report on the gas network operators and ERDF is going to be used by the CRE, in consultation with all the market players, to refine the incentive mechanisms already in place. Contents: 1

  13. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  14. Nuclear safety requirements for operation licensing of Egyptian research reactors

    International Nuclear Information System (INIS)

    Ahmed, E.E.M.; Rahman, F.A.

    2000-01-01

    From the view of responsibility for health and nuclear safety, this work creates a framework for the application of nuclear regulatory rules to ensure safe operation for the sake of obtaining or maintaining operation licensing for nuclear research reactors. It has been performed according to the recommendations of the IAEA for research reactor safety regulations which clearly states that the scope of the application should include all research reactors being designed, constructed, commissioned, operated, modified or decommissioned. From that concept, the present work establishes a model structure and a computer logic program for a regulatory licensing system (RLS code). It applies both the regulatory inspection and enforcement regulatory rules on the different licensing process stages. The present established RLS code is then applied to the Egyptian Research Reactors, namely; the first ET-RR-1, which was constructed and still operating since 1961, and the second MPR research reactor (ET-RR-2) which is now in the preliminary operation stage. The results showed that for the ET-RR-1 reactor, all operational activities, including maintenance, in-service inspection, renewal, modification and experiments should meet the appropriate regulatory compliance action program. Also, the results showed that for the new MPR research reactor (ET-RR-2), all commissioning and operational stages should also meet the regulatory inspection and enforcement action program of the operational licensing safety requirements. (author)

  15. Graduated driver licensing and differential deterrence: The effect of license type on intentions to violate road rules.

    Science.gov (United States)

    Poirier, Brigitte; Blais, Etienne; Faubert, Camille

    2018-01-01

    In keeping with the differential deterrence theory, this article assesses the moderating effect of license type on the relationship between social control and intention to violate road rules. More precisely, the article has two objectives: (1) to assess the effect of license type on intentions to infringe road rules; and (2) to pinpoint mechanisms of social control affecting intentions to violate road rules based on one's type of driver license (a restricted license or a full license). This effect is examined among a sample of 392 young drivers in the province of Quebec, Canada. Drivers taking part in the Graduated Driver Licensing (GDL) program have limited demerit points and there is zero tolerance for drinking-and-driving. Propensity score matching techniques were used to assess the effect of the license type on intentions to violate road rules and on various mechanisms of social control. Regression analyses were then conducted to estimate the moderating effect of license type. Average treatment effects from propensity score matching analyses indicate that respondents with a restricted license have lower levels of intention to infringe road rules. While moral commitment and, to a lesser extent, the perceived risk of arrest are both negatively associated with intentions to violate road rules, the license type moderates the relationship between delinquent peers and intentions to violate road rules. The effect of delinquent peers is reduced among respondents with a restricted driver license. Finally, a diminished capability to resist peer pressure could explain the increased crash risk in months following full licensing. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. 78 FR 26813 - Request To Amend a License To Import Radioactive Waste

    Science.gov (United States)

    2013-05-08

    ... NUCLEAR REGULATORY COMMISSION Request To Amend a License To Import Radioactive Waste Pursuant to..., 2013, April 23, material (Class to a maximum the licensee name 2013, IW022/03, 11005700. A radioactive total of 5,500 from ``Perma-Fix waste). tons of low- Environmental level waste). Services, Inc.'' to...

  17. Customer satisfaction with mobile operators’ services in Lithuanian rural areas

    OpenAIRE

    Pilelienė, Lina; Grigaliūnaitė, Viktorija

    2017-01-01

    In tough competitive conditions of Lithuanian mobile services market, customer satisfaction becomes one of the most important factors for customer retention and attraction. Lithuanian mobile market can be described as being in a maturity stage of its life-cycle: the prices and services of different mobile operators are quite similar. However, the network coverage and signal strength differs – main differences can be observed in rural areas of the country. Therefore, the scientific...

  18. Establishing a safety and licensing basis for generation IV advanced reactors. License by test

    International Nuclear Information System (INIS)

    Kadak, Andrew C.

    2001-01-01

    The license by test approach to licensing is a novel method of licensing reactors. It provides an opportunity to deal with innovative non-water reactors in a direct way on a time scale that could permit early certification based on tests of a demonstration reactor. The uncertainties in the design and significant contributors to risk would be identified in the PRA during the design. Deterministic analysis computer codes could be tested on a real reactor. Scaling effects and associated uncertainties would be minimized. License by test is an approach that has sufficient merit to be developed and tested

  19. Advanced CANDU reactor pre-licensing progress

    International Nuclear Information System (INIS)

    Popov, N.K.; West, J.; Snell, V.G.; Ion, R.; Archinoff, G.; Xu, C.

    2005-01-01

    The Advanced CANDU Reactor (ACR) is an evolutionary advancement of the current CANDU 6 reactor, aimed at producing electrical power for a capital cost and at a unit-energy cost significantly less than that of the current reactor designs. The Canadian Nuclear Safety Commission (CNSC) staff are currently reviewing the ACR design to determine whether, in their opinion, there are any fundamental barriers that would prevent the licensing of the design in Canada. This CNSC licensability review will not constitute a licence, but is expected to reduce regulatory risk. The CNSC pre-licensing review started in September 2003, and was focused on identifying topics and issues for ACR-700 that will require a more detailed review. CNSC staff reviewed about 120 reports, and issued to AECL 65 packages of questions and comments. Currently CNSC staff is reviewing AECL responses to all packages of comments. AECL has recently refocused the design efforts to the ACR-1000, which is a larger version of the ACR design. During the remainder of the pre-licensing review, the CNSC review will be focused on the ACR-1000. AECL Technologies Inc. (AECLT), a wholly-owned US subsidiary of AECL, is engaged in a pre-application process for the ACR-700 with the US Nuclear Regulatory Commission (USNRC) to identify and resolve major issues prior to entering a formal process to obtain standard design certification. To date, the USNRC has produced a Pre-Application Safety Assessment Report (PASAR), which contains their reviews of key focus topics. During the remainder of the pre-application phase, AECLT will address the issues identified in the PASAR. Pursuant to the bilateral agreement between AECL and the Chinese nuclear regulator, the National Nuclear Safety Administration (NNSA) and its Nuclear Safety Center (NSC), NNSA/NSC are reviewing the ACR in seven focus areas. The review started in September 2004, and will take three years. The main objective of the review is to determine how the ACR complies

  20. Electric Service Areas, Electric Servic Area - given to us from GA power and Planters Electric - distributed by the EMA Director, Val Ashcraft, Published in 2008, 1:2400 (1in=200ft) scale, Effingham County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Electric Service Areas dataset current as of 2008. Electric Servic Area - given to us from GA power and Planters Electric - distributed by the EMA Director, Val...

  1. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  2. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  3. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  4. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  5. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  6. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  7. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  8. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  9. History of the medical licensing examination (uieop in Korea’s Goryeo Dynasty (918-1392

    Directory of Open Access Journals (Sweden)

    Kyung-Lock Lee

    2015-05-01

    Full Text Available This article aims to describe the training and medical licensing system (uieop for becoming a physician officer (uigwan during Korea’s Goryeo Dynasty (918-1392. In the Goryeo Dynasty, although no license was necessary to provide medical services to the common people, there was a licensing examination to become a physician officer. No other national licensing system for healthcare professionals existed in Korea at that time. The medical licensing examination was administered beginning in 958. Physician officers who passed the medical licensing examination worked in two main healthcare institutions: the Government Hospital (Taeuigam and Pharmacy for the King (Sangyakguk. The promotion and expansion of medical education differed depending on the historical period. Until the reign of King Munjong (1046-1083, medical education as a path to licensure was encouraged in order to increase the number of physician officers qualifying for licensure by examination; thus, the number of applicants sitting for the examination increased. However, in the late Goryeo Dynasty, after the officer class of the local authorities (hyangri showed a tendency to monopolize the examination, the Goryeo government limited the examination applications by this group. The medical licensing examination was divided into two parts: medicine and ‘feeling the pulse and acupuncture’ (jugeumeop. The Goryeo Dynasty followed the Chinese Dang Dynasty’s medical system while also taking a strong interest in the Chinese Song Dynasty’s ideas about medicine.

  10. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  11. Cost and risk reduction using upfront licensing in Canada. Annex 15

    International Nuclear Information System (INIS)

    Snell, V.G.

    2002-01-01

    The paper summarizes the use of 'up-front' licensing in Canada - how licensing requirements are defined, and met - in advance of a project commitment. The approach to licensing in Canada has allowed flexibility in development of new designs. Since licensing was originally risk-based, and current regulatory policy allows cost-benefit considerations as part of the decision making, risk can be and should be used in novel circumstances as a licensing tool. Since the licensing framework is non-prescriptive, innovative approaches to design can be introduced and dispositioned without changing the legal structure. This flexibility has been used in several up-front licensing reviews: a small urban heating reactor, repeat CANDU 6 generating station units, and the single unit CANDU 9 generating station. In the future we expect to apply it to advanced designs, as an essential part of risk reduction and customer confidence in the product. The important lessons learned in Canada include: Up-front licensing is essential to reduce the risk of licensing-related delays once a project has been committed. It requires a significant investment in time and effort from both the designer and the regulator; The most effective scope for up-front licensing is for the regulator to thoroughly assess novel concepts, test the design against changed domestic requirements, and follow-up on known difficult areas; and for the designer to ensure foreign requirements are incorporated. There is little benefit in certifying the design in detail; Although it would be satisfying to have legally-binding certification, in the end there can be no legal obligation on the regulator, and agreement is pursued on the basis of good faith that the regulator will not make arbitrary decisions and that the designer will meet agreed targets or requirements; In almost all circumstances, issues will arise that are beyond the current 'rules', however expressed. Rather than rushing to create new rules, one reaches a

  12. Licensing in an International Market

    Science.gov (United States)

    Ferreira, Fernanda A.

    2008-09-01

    We study the effects of entry of a foreign firm on domestic welfare in the presence of licensing, when the entrant is technologically superior to the incumbent. We show that foreign entry increases domestic welfare for sufficiently large technological differences between the firms under both fixed-fee licensing and royalty licensing.

  13. 22 CFR 120.20 - License.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false License. 120.20 Section 120.20 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.20 License. License means a document bearing the word “license” issued by the Directorate of Defense Trade...

  14. Technological evaluation for the extension of the operation license to the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Arganis J, C. R.; Medina A, A. L.

    2010-01-01

    At the present time one of the tendencies in the nuclear industry is the renovation of operation licenses of the nuclear power plants, with the purpose of prolonging their operation 20 years more than the time settled down in their original license, which is of 30 years for the case of the nuclear power plant of Laguna Verde. This allows the electric power generation for a major period of time and to a relatively low price, giving this way a bigger competitiveness to the power stations of nuclear power. However, to request the license extension of the nuclear power plant requires to get ready the documentation and necessary studies for: to maintain a high level of security, to optimize the operation, maintenance and service life of the structures, systems and components, to maintain an acceptable level of performance, to maximize the recovery of the investment about the service of the nuclear power plant and to preserve the sure conditions for a major operation period at the license time. This paper describes the studies conducted by the Materials Technology Department of the Instituto Nacional de Investigaciones Nucleares (ININ) to substantiate the required documentation for obtaining the extension of operating license of the nuclear power plant. These studies are focused mainly in the reactor pressure vessels of both units, as well as in the deposit of noble metals and the influence of the sludges (crud s) in this deposit. (Author)

  15. 48 CFR 227.7203-4 - License rights.

    Science.gov (United States)

    2010-10-01

    ... Software and Computer Software Documentation 227.7203-4 License rights. (a) Grant of license. The... license, under an irrevocable license granted or obtained by the contractor which developed the software... granted to the Government. The scope of a computer software license is generally determined by the source...

  16. Current status of construction license of PEFP

    International Nuclear Information System (INIS)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T.

    2012-01-01

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically

  17. Current status of construction license of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically.

  18. Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    acquisition. The findings indicate that technology licensing is positively related to the number of inventions produced by the licensee in the years subsequent to the licensing deal. Subsequently, I investigate the moderating effect that organizational slack and myopia have on this main relationship....... The findings also suggest that high levels of Organizational Slack (available financial resources) strengthen the positive effect of licensing on innovation. However, higher levels of Organizational Myopia (the extent to which a firm draws on its own knowledge) can decrease the main effect of licensing....

  19. Serviceability criteria for buildings in mine subsidence area -- Adjustment to Eurocodes

    International Nuclear Information System (INIS)

    Kawulok, M.; Sulimowski, Z.

    1994-01-01

    Due to ground deformations caused by underground mining, building structures in mining areas are frequently subjected to considerable deformations and damage to the finishing and structural elements. As a consequence, serviceable values of such structures are distinctly diminished, and in extreme cases, seriously damaged structures may be exempted from further service. These problems are not duly represented in the existing building standard codes. It is also important to determine relationship between damage stage and value of the building, and hence the strategy for reconstruction or renovation works. The paper presents proposals concerning serviceability criteria of building structures in mining areas, in terms of basic standard requirements valid in building in Poland, as well as proposals of Eurocodes. Building structures under consideration have been divided into structures designed to resist mining influences and existing structures, not adapted to conform to these influences at the design and erection stages

  20. 31 CFR 596.309 - Specific license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.309 Specific license. The term specific license means any license or...

  1. Online driver's license renewal.

    Science.gov (United States)

    2015-09-01

    The Kentucky Department of Vehicle Regulation is exploring the possibility of developing and implementing online : drivers license renewal. The objective of this project was to: 1) evaluate online drivers license and REAL ID renewal : programs ...

  2. The need for legislative framework (licensing)

    International Nuclear Information System (INIS)

    Krech, H.

    1977-01-01

    For reasons of public acceptance the basis of a licensing system should be laid down in a law, details can be fixed in regulations below the law-level. The competence for licensing nuclear installations should be attributed to one body, which is not a the same time charged with the promotion of nuclear energy. The licensing authority has to be provided with sufficient technical advice, given by experts organized in advisory bodies. Normally a licensing procedure is split into several steps (site approval, construction permit, operation licence), each step can be subdivided. Some general aspects of licensing conditions (personal, technical and financial) as well as of the licensing procedure are outlined. The participation of the public is of particular importance but also involves most intricate problems. The paper concludes with some critical remarks on the role of administrative courts with respect to the licensing of nuclear power plants. (orig.) [de

  3. 31 CFR 596.305 - General license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.305 General license. The term general license means any license or authorization...

  4. New nuclear plant design and licensing process

    International Nuclear Information System (INIS)

    Luangdilok, W.

    1996-01-01

    This paper describes latest developments in the nuclear power reactor technology with emphasis on three areas: (1) the US technology of advanced passive light water reactors (AP600 and S BWR), (2) regulatory processes that certify their safety, and (3) current engineering concerns. The goal is to provide and insight of how the government's regulatory agency guarantees public safety by looking into how new passive safety features were designed and tested by vendors and how they were re-evaluated and retested by the US NRC. The paper then discusses the US 1989 nuclear licensing reform (10 CFR Part 52) whose objectives are to promote the standardization of nuclear power plants and provide for the early and definitive resolution of site and design issues before plants are built. The new licensing process avoids the unpredictability nd escalated construction cost under the old licensing process. Finally, the paper summarizes engineering concerns found in current light water reactors that may not go away in the new design. The concerns are related the material and water chemistry technology in dealing with corrosion problems in water-cooled nuclear reactor systems (PWRs and BWRs). These engineering concerns include core shroud cracking (BWRs), jet pump hold-down beam cracking (BWRs), steam generator tube stress corrosion cracking (PWR)

  5. 76 FR 56482 - Notice and Request For Comments: LSC Elimination of the West Virginia Migrant Service Area...

    Science.gov (United States)

    2011-09-13

    ... Migrant Service Area Beginning January 1, 2012 AGENCY: Legal Services Corporation. ACTION: Notice and Request for Comments. SUMMARY: The Legal Services Corporation will eliminate the West Virginia migrant service area, i.e., MWV effective January 1, 2012, because any eligible migrant population in West...

  6. 77 FR 59941 - Prospective Grant of Exclusive License: Terahertz Scanning Systems for Cancer Pathology

    Science.gov (United States)

    2012-10-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Prospective Grant of Exclusive License: Terahertz Scanning Systems for Cancer Pathology AGENCY: National Institutes of Health... field of use limited to terahertz scanning systems for cancer pathology. Upon the expiration or...

  7. Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues

    International Nuclear Information System (INIS)

    Silverman, D.J.; Bauser, M.A.; Baird, R.D.

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application

  8. Safeguards at NRC licensed facilities: Are we doing enough

    International Nuclear Information System (INIS)

    Asselstine, J.K.

    1986-01-01

    Safeguards at the Nuclear Regulatory Commission (NRC) facilities are discussed in this paper. The NRC is pursuing a number of initiatives in the safeguards area. The Commission is conducting a reassessment of its safeguards design basis threat statements to consider the possible implications of an explosive-laden vehicle for U.S. nuclear safeguards and to examine the comparability of safeguards features at NRC-licensed and DOE facilities. The Commission is also completing action on measures to protect against the sabotage threat from an insider at NRC-licensed facilities, and is examining the potential safety implications of safeguards measures. Finally, the NRC has developed measures to reduce the theft potential for high-enriched uranium

  9. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  10. Wide-area service water information management system; Koiki suido joho kanri system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-10

    A wide-area service water system is required to be more resistant to emergency situations, e.g., drought and hazards, and meet consumers' diversifying needs in each area, while stably supplying water at ordinary times by utilizing purification plants located in places within its system and piping networks in the water area. Fuji Electric is providing information management systems for wide-area service water systems, developed based on the company's abundant system know-hows accumulated for a long time and latest techniques. They are characterized by (1) Web monitoring, aided by an intranet system, (2) high-speed data transmission by a digital transmission system, (3) open network environments, and (4) emergency calling of the staff, and management of stock materials. The system allows to monitor operating conditions within the area on real time, needless to say, and business administration with civil minimum taken into consideration, e.g., stabilizing water quality by coordinating the purification plants within the system. (translated by NEDO)

  11. A multi-indicator framework for mapping cultural ecosystem services: The case of freshwater recreational fishing

    Science.gov (United States)

    Villamagna, Amy M.; Mogollón, Beatriz; Angermeier, Paul

    2014-01-01

    Despite recent interest, ecosystem services are not yet fully incorporated into private and public decisions about natural resource management. Cultural ecosystem services (CES) are among the most challenging of services to include because they comprise complex ecological and social properties and processes that make them difficult to measure, map or monetize. Like others, CES are vulnerable to landscape changes and unsustainable use. To date, the sustainability of services has not been adequately addressed and few studies have considered measures of service capacity and demand simultaneously. To facilitate sustainability assessments and management of CES, our study objectives were to (1) develop a spatially explicit framework for mapping the capacity of ecosystems to provide freshwater recreational fishing, an important cultural service, (2) map societal demand for freshwater recreational fishing based on license data and identify areas of potential overuse, and (3) demonstrate how maps of relative capacity and relative demand could be interfaced to estimate sustainability of a CES. We mapped freshwater recreational fishing capacity at the 12-digit hydrologic unit-scale in North Carolina and Virginia using a multi-indicator service framework incorporating biophysical and social landscape metrics and mapped demand based on fishing license data. Mapping of capacity revealed a gradual decrease in capacity eastward from the mountains to the coastal plain and that fishing demand was greatest in urban areas. When comparing standardized relative measures of capacity and demand for freshwater recreational fishing, we found that ranks of capacity exceeded ranks of demand in most hydrologic units, except in 17% of North Carolina and 5% of Virginia. Our GIS-based approach to view freshwater recreational fishing through an ecosystem service lens will enable scientists and managers to examine (1) biophysical and social factors that foster or diminish cultural ecosystem

  12. Licensing aspects regarding the RBMN project

    International Nuclear Information System (INIS)

    Cuccia, Valeria; Sacramento, Arivaldo M.; Aleixo, Bruna L.; Ferreira, Vinicius V.M.

    2013-01-01

    The licensing process of a waste disposal facility is a complex and demanding undertaking. It proceeds in phases, starting with the site selection and ending many decades later, when the radionuclides decayed and no longer offer possible hazard. That is one of the reasons why the licensing process for the Brazilian repository for low and intermediate level radioactive waste (RBMN Project) is a challenge for all the technicians involved. Besides that, the only national experience associated to this subject arose after a radiological accident in the State of Goias, in 1987. Two different institutions are involved in this licensing process: IBAMA, for environmental licensing, and CNEN, for nuclear licensing. Both of them will evaluate the possible impacts caused by the waste disposal, so it is essential to avoid conflicts and duplications of activities. The RBMN project has different teams for each main activity, and one of them is the Licensing group. This team has been planning the licensing activities for the repository, studying the legal framework and estimating costs and execution time for each step. This paper presents the status of the licensing activities regarding to the RBMN project done by the CNEN staff. (author)

  13. 42 CFR 440.10 - Inpatient hospital services, other than services in an institution for mental diseases.

    Science.gov (United States)

    2010-10-01

    ... an institution for mental diseases. 440.10 Section 440.10 Public Health CENTERS FOR MEDICARE... for mental diseases. (a) Inpatient hospital services means services that— (1) Are ordinarily furnished... and treatment of patients with disorders other than mental diseases; (ii) Is licensed or formally...

  14. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Rønde, Thomas; Fosfuri, Andrea

    the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend upon product market performance. If licensing is decentralized, the business unit forgoes valuable...... licensing opportunities since the rewards for licensing are (optimally) weaker than those for product market profits. This distortion is stronger when production-based incentives are more powerful, making centralization more attractive. Growth of technology markets favors centralization and drives higher...

  15. Department of Energy licensing strategy

    International Nuclear Information System (INIS)

    Frei, M.W.

    1984-01-01

    The Department of Energy (DOE) is authorized by the Nuclear Waste Policy Act of 1982 (Act) to site, design, construct, and operate mined geologic repositories for high-level radioactive wastes and is required to obtain licenses from the Nuclear Regulatory Commission (NRC) to achieve that mandate. To this end the DOE has developed a licensing approach which defines program strategies and which will facilitate and ease the licensing process. This paper will discuss the regulatory framework within which the repository program is conducted, the DOE licensing strategy, and the interactions between DOE and NRC in implementing the strategy. A licensing strategy is made necessary by the unique technical nature of the repository. Such a facility has never before been licensed; furthermore, the duration of isolation of waste demanded by the proposed EPA standard will require a degree of reliance on probabilistic performance assessment as proof of compliance that is a first of a kind for any industry. The licensing strategy is also made necessary by the complex interrelationships among the many involved governmental agencies and even within DOE itself, and because these relationships will change with time. Program activities which recognize these relationships are essential for implementing the Act. The guiding principle in this strategy is an overriding commitment to safeguarding public health and safety and to protecting the environment

  16. 36 CFR 1011.17 - Will a debtor who owes a debt be ineligible for Presidio Trust licenses, permits, leases...

    Science.gov (United States)

    2010-07-01

    ..., permits, leases, privileges or services? Unless prohibited by law, the Presidio Trust may terminate... be ineligible for Presidio Trust licenses, permits, leases, privileges or services? 1011.17 Section 1011.17 Parks, Forests, and Public Property PRESIDIO TRUST DEBT COLLECTION Procedures To Collect...

  17. Software licenses: Good fences make good neighbors

    International Nuclear Information System (INIS)

    McCreary, J.G.; Woodyard, A.

    1995-01-01

    The basis for a good contract is that it is beneficial to both parties. A good foundation will cement the responsibilities and obligations of the parties after areas of agreement have been negotiated. Unfortunately, software licenses do not always reflect what is best for all. Some clauses are definitely for the benefit of the vendor, while others are required by a prudent client. The resulting contract is then a matter of reasonable compromise to achieve a good business relationship. Major issues of warranty, liability, training, support, and payment may be in conflict. Such topics as maintenance, testing, patents, extent of use, and return of software are often overlooked or addressed unevenly. This paper addresses these subjects and provides guidelines for software licenses. An understanding of legal phrases is of value. A better understanding of the viewpoints of both the vendor and the client results in a better working relationship

  18. Application of up-front licensing

    Energy Technology Data Exchange (ETDEWEB)

    Grant, S D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada); Snell, V G [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    AECL has been pioneering `up-front` licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs.

  19. Application of up-front licensing

    International Nuclear Information System (INIS)

    Grant, S.D.; Snell, V.G.

    1995-01-01

    AECL has been pioneering 'up-front' licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs

  20. 76 FR 15826 - Fisheries of the Exclusive Economic Zone Off Alaska; Gulf of Alaska License Limitation Program

    Science.gov (United States)

    2011-03-22

    ... Islands (AI); Southeast Outside District (SEO); Central Gulf of Alaska (CG), which includes the West... LLP licenses could resume fishing under the licenses in the future and thereby adversely affect active... BS or AI regulatory areas because a Pacific cod endorsement requirement has already been established...

  1. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  2. License renewal in the United States

    International Nuclear Information System (INIS)

    Brons, Jack

    2002-01-01

    Full text: Nuclear plants in the United States are licensed for 40 years, a length specified in the Atomic Energy Act of 1954, which laid out much of the regulatory basis for the commercial nuclear industry. The Act, however, made provision for license renewal. The original 40-year license period was chosen arbitrarily by the U.S. Congress because it was the typical period over which utilities recovered their investment in electricity generating plants. Nuclear plants, however, are subject to a rigorous program of Nuclear Regulatory Commission oversight, maintenance and equipment replacement. In effect, they must be in the same operating condition on the last day of their licenses as they were on the first. As the industry matured, it became apparent that there was no physical limitation on the continued operation of nuclear plants past 40 years. The industry turned its attention toward license renewal. When the issue was first raised, the NRC considered stringent process equivalent to seeking a new operating license for each plant. The complexity, length and cost of the process made it unlikely that many nuclear plants would seek license renewal. The nuclear industry worked successfully with NRC on the application of generic principles to license renewal, however, and in 1995, the NRC issued an efficient, tightly-focused rule that made license renewal a safe, viable option. To extend the operating license for a reactor, a company must demonstrate to the NRC that aging effects will be adequately managed during the renewal terms, thus ensuring equipment functionality. The rule allows licensees to apply for extensions of up to 20 years. The first license renewal application was filed in 1998 by the owner of the two-unit Calvert Cliffs plant. Shortly thereafter, an application was filed for the three-unit Oconee Nuclear Station. The NRC renewed the licenses for all five units in 2000, and since then, five more licenses have been renewed. The NRC has received 37

  3. Organization and practices on regulatory review in the licensing process of nuclear power plants in Spain

    International Nuclear Information System (INIS)

    Trueba, P.

    1979-01-01

    The actual organisation, practices and experience of the JEN Nuclear Safety Department on the regulatory review in the licensing process of nuclear power plants in Spain, are presented. Topics to be covered are: The structure, organisation, staff and principal functional areas of the NSD, the academic qualifications and work experience of the NSD personnel, recruiting and training, the conduct of the regulatory review during the licensing process and working procedures, the manpower and coverage of the different technical areas, the principal problems and conclusions. (author)

  4. Development and licensing of a melting plant for Chernobyl scrap

    International Nuclear Information System (INIS)

    Sappok, M.; Zunk, H.; Fashevsky, K.A.

    1998-01-01

    One decade after the accident at unit 4 of the Chernobyl nuclear power station, a melting plant for radioactively contaminated metallic materials, the so-called SURF facility, is being planned and licensed for erection in the direct neighbourhood of the NPP area. Main goal is the recycling of the material largely decontaminated by the melting process, by means of manufacturing of casks and containers for waste disposal and of shielding equipment. The melting plant will be part of the Ukrainian waste handling centre (CPPRO). The technology is based on the long-term experience gained at Siempelkamp's CARLA plant in Krefeld. Within 1995 and 1996 the licensing conditions were defined, the licensing documents prepared and the formal procedure initiated. The complex is scheduled to start operation in 2001, in case the necessary financing is allocated. To this end the proposed site of the facility has undergone the state assessment. The technical documentation for construction is at the stage of development. (author)

  5. Changes in the 'medical research' licensing procedure under the German Radiation Protection Ordinance

    International Nuclear Information System (INIS)

    Habeck, M.; Minkov, V.; Griebel, J.; Brix, G.; Epsch, R.; Langer, M.

    2012-01-01

    This publication outlines the 'medical research' licensing procedure as specified in the amendment of the German Radiation Protection Ordinance of November 1, 2011. The general licensing requirements for the use of radiation have not been changed by the amendment. Three so-called use restrictions (i.e., dose limits of 10 mSv and 20 mSv, age limit of 50 years) have been modified. They will only apply to healthy volunteers in the future. In addition, there are considerable simplifications with respect to applications and licensing procedures of the Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz, BfS) regarding the use of radiation in the newly introduced 'accompanying diagnostics' ('Begleitdiagnostik') case group. The newly established, independent panel of experts at the German Radiological Society (Deutsche Roentgengesellschaft, DRG) may provide essential support to principal investigators, qualified physicians and sponsors for differentiating between 'medical research' and 'health care', the latter not being subject to licensing. An expert statement will be issued by the DRG within four weeks of an inquiry. This consulting service is subject to confidentiality, and is free of charge for inquirers and without any commitment. (orig.)

  6. CHOOSING THE RIGHT FORM OF LICENSING A BUSINESS IN ROMANIA

    Directory of Open Access Journals (Sweden)

    ROIBAN Roxana Nadina

    2012-12-01

    Full Text Available Choosing the most appropriate form of licensing a business is an important decision not easy to be made by an entrepreneur and it should be taken only after he has the required skills and abilities to do so. The business idea should harmonize with the business environment and its future trends, with the existing opportunities and the future products or services that the company will provide and not least the entrepreneur has to make sure that he has sufficient resources to get started. We consider that every business has a number of features that make certain forms of licensing to be more suitable than others. This paper aims to present a multitude of items to be reviewed by an entrepreneur at the start-up in order to choose the most appropriate licensing type for his business. Given that our country's law allows entrepreneurs to license their businesses in several forms, the decision to choose between many existing possibilities is a very important one for the future good of the business. Currently in our country there are two major laws governing the licensing of a business. The first one is the republished and subsequently amended Company Law number 31/1990 and the second, the Government Emergency Ordinance number 44/2008 regarding the economic activities of the Sole traders, Individual enterprises and Family enterprises. The Company Law number 31/1990 allows companies to choose between one of the five types of business entities that can operate in Romania: General partnership (in Romanian SNC, Limited partnership (in Romanian SCS, Limited partnerships by shares (in Romanian SCA, Joint stock company (in Romanian S.A. and Limited liability company (in Romanian S.R.L.. GEO number 44/2008 on economic activities of the Sole traders, Individual enterprises and Family enterprises regulates the licensing and the activity of a Sole traders, Individual enterprises and Family enterprises.

  7. A Malaysian Vehicle License Plate Localization and Recognition System

    OpenAIRE

    Ganapathy Velappa; Dennis LUI Wen Lik

    2008-01-01

    Technological intelligence is a highly sought after commodity even in traffic-based systems. These intelligent systems do not only help in traffic monitoring but also in commuter safety, law enforcement and commercial applications. In this paper, a license plate localization and recognition system for vehicles in Malaysia is proposed. This system is developed based on digital images and can be easily applied to commercial car park systems for the use of documenting access of parking services,...

  8. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  9. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    OpenAIRE

    Marco Ciurcina

    2017-01-01

    This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  10. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Fosfuri, Andrea; Rønde, Thomas

    2013-01-01

    , we find that interdependency across business units may result in more, not less, decentralization. Furthermore, even though centralization results in less information, centralized licensing deals are larger. Our model conforms to the existing evidence that reports heterogeneity across firms in both......Technology licensing is an important means for companies to extract more value from their intellectual assets. We build a model that helps understand how licensing activity should be organized within large corporations. More specifically, we compare decentralization—where the business unit using...... the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend on product market performance. If licensing is decentralized, the business unit forgoes valuable...

  11. 77 FR 22333 - Prospective Grant of Exclusive License: Development of Oncolytic Viral Cancer Therapies

    Science.gov (United States)

    2012-04-13

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Prospective Grant of Exclusive License: Development of Oncolytic Viral Cancer Therapies AGENCY: National Institutes of Health... administration of the recombinant virus to a human or animal subject, the foreign gene is expressed in vivo to...

  12. 7 CFR 6.28 - Transfer of license.

    Science.gov (United States)

    2010-01-01

    ... Licensing Authority will transfer to such other person the historical, nonhistorical or designated license... escrow with the sole condition for return of escrow being that the Licensing Authority determines that... to whom the historical licenses were issued during the quota year in which the sale or conveyance...

  13. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    Directory of Open Access Journals (Sweden)

    Marco Ciurcina

    2017-06-01

    Full Text Available This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  14. BioServices: a common Python package to access biological Web Services programmatically.

    Science.gov (United States)

    Cokelaer, Thomas; Pultz, Dennis; Harder, Lea M; Serra-Musach, Jordi; Saez-Rodriguez, Julio

    2013-12-15

    Web interfaces provide access to numerous biological databases. Many can be accessed to in a programmatic way thanks to Web Services. Building applications that combine several of them would benefit from a single framework. BioServices is a comprehensive Python framework that provides programmatic access to major bioinformatics Web Services (e.g. KEGG, UniProt, BioModels, ChEMBLdb). Wrapping additional Web Services based either on Representational State Transfer or Simple Object Access Protocol/Web Services Description Language technologies is eased by the usage of object-oriented programming. BioServices releases and documentation are available at http://pypi.python.org/pypi/bioservices under a GPL-v3 license.

  15. Research and development tasks of the basalt waste isolation program, and their relationship to the licensing process

    International Nuclear Information System (INIS)

    Kunkel, W.P.

    1978-06-01

    This document presents a preliminary licensing program and outlines the research and development strategy by which a license will be obtained for the repository. It addresses the base data covering the major areas of investigation and technology which will provide input to the licensing process. Basically, each facet of the program, as described in the plan, will be used as part of the documentation required for the Preliminary and Final Safety Analysis Report (PSAR and FSAR), as well as the Environmental Report

  16. Support services for new nuclear power plant projects

    International Nuclear Information System (INIS)

    Manrique, Alberto B.; Cazorla, Francisco

    2009-01-01

    TECNATOM is a spanish engineering company with more than 50 years of experience working for the nuclear industry all over the world. TECNATOM has worked in over 30 countries in activities related to the Operation and Maintenance of Nuclear Power Plants. It started to work in the design of new Nuclear Power Plants in the early 90s and since then has continued collaborating with different suppliers in the design and licensing of new reactors specially in the areas of plant systems design, Man-Machine Interface design, Main Control Room simulators building, training, qualification of equipment and PSI/ISI engineering services. (author)

  17. Service design: a review of methods and techniques inthe point of view of service operations management area

    Directory of Open Access Journals (Sweden)

    Noel Torres Júnior

    2013-11-01

    Full Text Available As in many developing countries, the service sector in Brazil is responsible for generating income and employment for a significant portion of the population. Due to this economic relevance, service organizations are faced with an increasingly demanding and competitive market. This demand greater innovation and business planning. Despite this, the process of service development remains a relatively unexplored subject in the literature. Several issues regarding the planning and management remain without clear ideas or propositions that guide their appropriate treatment. The result of this situation, the methods and techniques that help design the services are not properly disseminated. These are scattered through the literature of operations management services. Given this framework, the light of a review of the literature and concerning the elements that compose the service project according to the works of Machuca, Zamora-Gonzalez and Aguilar-Escobar (2007 and Edvardsson (1997, the present work points and examine the methods and techniques suggested by many authors and works on the area of Service Operations. It was found that the knowledge about the methods and techniques is diffuse. This knowledge is concentrated on the design process and determining the location of services.

  18. Licensing Teachers: Lessons from Other Professions.

    Science.gov (United States)

    Haberman, Martin

    1986-01-01

    The licensing of teachers should be modeled against professions similar to teaching rather than professions like medicine and architecture that are vastly different. Applying similar licensing practices can raise the status of teaching. Ignoring these licensing practices will prevent teachers from functioning as professionals. (MD)

  19. Quality of community basic medical service utilization in urban and suburban areas in Shanghai from 2009 to 2014

    Science.gov (United States)

    Ma, Jun; Li, Shujun; Cai, Yuyang; Sun, Wei; Liu, Qiaohong

    2018-01-01

    Urban areas usually display better health care services than rural areas, but data about suburban areas in China are lacking. Hence, this cross-sectional study compared the utilization of community basic medical services in Shanghai urban and suburban areas between 2009 and 2014. These data were used to improve the efficiency of community health service utilization and to provide a reference for solving the main health problems of the residents in urban and suburban areas of Shanghai. Using a two-stage random sampling method, questionnaires were completed by 73 community health service centers that were randomly selected from six districts that were also randomly selected from 17 counties in Shanghai. Descriptive statistics, principal component analysis, and forecast analysis were used to complete a gap analysis of basic health services utilization quality between urban and suburban areas. During the 6-year study period, there was an increasing trend toward greater efficiency of basic medical service provision, benefits of basic medical service provision, effectiveness of common chronic disease management, overall satisfaction of community residents, and two-way referral effects. In addition to the implementation effect of hypertension management and two-way referral, the remaining indicators showed a superior effect in urban areas compared with the suburbs (Pservice utilization. Comprehensive satisfaction clearly improved as well. Nevertheless, there was an imbalance in health service utilization between urban and suburban areas. There is a need for the health administrative department to address this imbalance between urban and suburban institutions and to provide the required support to underdeveloped areas to improve resident satisfaction. PMID:29791470

  20. Quality of community basic medical service utilization in urban and suburban areas in Shanghai from 2009 to 2014.

    Science.gov (United States)

    Guo, Lijun; Bao, Yong; Ma, Jun; Li, Shujun; Cai, Yuyang; Sun, Wei; Liu, Qiaohong

    2018-01-01

    Urban areas usually display better health care services than rural areas, but data about suburban areas in China are lacking. Hence, this cross-sectional study compared the utilization of community basic medical services in Shanghai urban and suburban areas between 2009 and 2014. These data were used to improve the efficiency of community health service utilization and to provide a reference for solving the main health problems of the residents in urban and suburban areas of Shanghai. Using a two-stage random sampling method, questionnaires were completed by 73 community health service centers that were randomly selected from six districts that were also randomly selected from 17 counties in Shanghai. Descriptive statistics, principal component analysis, and forecast analysis were used to complete a gap analysis of basic health services utilization quality between urban and suburban areas. During the 6-year study period, there was an increasing trend toward greater efficiency of basic medical service provision, benefits of basic medical service provision, effectiveness of common chronic disease management, overall satisfaction of community residents, and two-way referral effects. In addition to the implementation effect of hypertension management and two-way referral, the remaining indicators showed a superior effect in urban areas compared with the suburbs (Pservice utilization. Comprehensive satisfaction clearly improved as well. Nevertheless, there was an imbalance in health service utilization between urban and suburban areas. There is a need for the health administrative department to address this imbalance between urban and suburban institutions and to provide the required support to underdeveloped areas to improve resident satisfaction.

  1. Licensing of nuclear and radioactive installations in Peru

    International Nuclear Information System (INIS)

    Medina Gironzini, E.

    1987-01-01

    In Peru, the Regulation for Ionizing Radiation Sources is applied, which establishes the norms and procedures to follow in the nuclear and radioactive installations of the country in order to assure their correct operation as concerns to the nuclear safety and radiological protection, allowing the emission of the respective licenses. As for the nuclear facilities, this authorization includes the Previous License, the Construction License and the Operation License (provisional and definitive) and for radioactive facilities and equipment generating ionizing radiations: the Construction License and the Operation License. The personnel also require a license that can be an operator license (as for nuclear reactors) or a supervisor license (for nuclear and radioactive facilities). In spite of the above mentioned regulation and its long enforcement period, less than 10% of radioactive facilities in this country are licensed, due to different problems which will be solved in the medium term. (Author)

  2. The licensing processes influence on nuclear market

    International Nuclear Information System (INIS)

    Locatelli, Giorgio; Mancini, Mauro; Sainati, Tristano; Sallinen, Liisa

    2011-01-01

    The paper deals with the licensing nuclear power plants; it focuses primarily on the licensing process implications into the international nuclear market. Nowadays there are twenty-six countries that are planning to build new nuclear facilities, and thirty-seven where nuclear reactors are proposed; on the other hand, there are mainly ten international reactor vendors. At international level, there are few vendors that have sufficient resources, capabilities and experience to carry out the design and delivering of a nuclear power plant in the international market; On the other hand, the licensing processes are strictly dependent on national law frameworks, and on the nuclear policies. The paper proposes a comparison of six licensing processes (the ones established in Finland, France, Italy, South Korea, USA and UK), and analyzes its main features and implications; the IAEA licensing process is taken as reference point. The objective of the paper is to propose a systemic approach for considering the licensing procedures. The framework proposed enables facilitating the licensing management and inferring the main features of licensing contexts. The paper concludes with a forecast of the nuclear licensing context, especially with respect to the fourth generation of nuclear reactors. (author)

  3. Whom to Choose as License Partner?

    DEFF Research Database (Denmark)

    Laursen, Keld; Reichstein, Toke; Trombini, Giulia

    2013-01-01

    between technology and market forces: if partners are market distant, the likelihood of technology license contractual partnership decreases with partners’ technological distance. Using data on the formation of license partnerships in the global biopharmaceutical industry over the period 1994......This paper investigates the matching of firms on the market for technology. The paper forwards two dimensions along which license formation occurs: technology and product-market. Both sides of the market search for a partner representing potential for high technology synergies to maximize licensing...

  4. Exporting the Canadian licensing program

    International Nuclear Information System (INIS)

    Whelan, D.J.

    1981-06-01

    This paper deals with the problems of an overseas regulatory agency in licensing a Canadian-supplied nuclear plant which is referenced to a plant in Canada. Firstly, the general problems associated with the use of a reference plant are discussed. This is followed by a discussion of specific problems which arise from the licensing practices in Canada. The paper concludes with recommendations to simplify the task of demonstrating the licensability of an overseas CANDU plant

  5. 7 CFR 6.32 - Globalization of licenses.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Globalization of licenses. 6.32 Section 6.32 Agriculture Office of the Secretary of Agriculture IMPORT QUOTAS AND FEES Dairy Tariff-Rate Import Quota Licensing § 6.32 Globalization of licenses. If the Licensing Authority determines that entries of an article...

  6. New Reactor Siting, Licensing and Construction Experience. Proceedings of the 2. CNRA International Workshop on 'New Reactor Siting, Licensing and Construction Experience'

    International Nuclear Information System (INIS)

    2013-01-01

    This report documents the proceedings from the 2. Workshop on New Reactor Siting, Licensing and Construction Experience. A total of 45 specialists from 16 countries and international organisations attended. The meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the US Nuclear Regulatory Commission (U.S.NRC). The objectives of the workshop were to provide a forum to exchange information on lessons learned from siting, licensing and constructing new nuclear power plants around the world. Key focus areas included siting practices and regulatory positions that have been enhanced as a result of the Fukushima accident; lessons learned from licensing and design review approaches and challenges, construction experience and recommendations for regulatory oversight; and regulatory cooperation on generic and design specific issues through the MDEP specific working groups. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to regulatory cooperation on generic and design specific issues, MDEP working groups (EPR, AP1000), vendor inspection co-operation, digital I and C, and codes and standards. The second technical session was intended to discuss and share regulatory positions on siting practices and enhancements as a result of lessons learned from Fukushima accident. The third technical session addressed the construction experience and regulatory oversight of new reactor construction activities. And the fourth technical session included presentations on the lessons learned from regulatory licensing reviews of new reactor designs

  7. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  8. Identifying areas of need relative to liver disease: geographic clustering within a health service district.

    Science.gov (United States)

    El-Atem, Nathan; Irvine, Katharine M; Valery, Patricia C; Wojcik, Kyle; Horsfall, Leigh; Johnson, Tracey; Janda, Monika; McPhail, Steven M; Powell, Elizabeth E

    2017-08-01

    Background Many people with chronic liver disease (CLD) are not detected until they present to hospital with advanced disease, when opportunities for intervention are reduced and morbidity is high. In order to build capacity and liver expertise in the community, it is important to focus liver healthcare resources in high-prevalence disease areas and specific populations with an identified need. The aim of the present study was to examine the geographic location of people seen in a tertiary hospital hepatology clinic, as well as ethnic and sociodemographic characteristics of these geographic areas. Methods The geographic locations of hepatology out-patients were identified via the out-patient scheduling database and grouped into statistical area (SA) regions for demographic analysis using data compiled by the Australian Bureau of Statistics. Results During the 3-month study period, 943 individuals from 71 SA Level 3 regions attended clinic. Nine SA Level 3 regions accounted for 55% of the entire patient cohort. Geographic clustering was seen especially for people living with chronic hepatitis B virus. There was a wide spectrum of socioeconomic advantage and disadvantage in areas with high liver disease prevalence. Conclusions The geographic area from which people living with CLD travel to access liver health care is extensive. However, the greatest demand for tertiary liver disease speciality care is clustered within specific geographic areas. Outreach programs targeted to these areas may enhance liver disease-specific health service resourcing. What is known about the topic? The demand for tertiary hospital clinical services in CLD is rising. However, there is limited knowledge about the geographic areas from which people living with CLD travel to access liver services, or the ethnic, socioeconomic and education characteristics of these areas. What does this paper add? The present study demonstrates that a substantial proportion of people living with CLD and

  9. Role of library's subscription licenses in promoting open access to scientific research

    KAUST Repository

    Buck, Stephen

    2018-01-01

    This presentation, based on KAUST’’s experience to date, will attempt to explain the different ways of bringing Open Access models to scientific Publisher’s licenses. Our dual approach with offset pricing is to redirect subscription money to publishing money and embed green open access deposition terms in understandable language in our license agreements. Resolving the inherent complexities in open access publishing, repository depositions and offsetting models will save libraries money and also time wasted on tedious and unnecessary administration work. Researchers will also save their time with overall clarity and transparency. This will enable trust and, where mistakes are made, and there inevitably will be with untried models, we can learn from these mistakes and make better, more robust services with auto deposition of our articles to our repository fed by Publishers’ themselves. The plan is to cover all Publishers with OA license terms for KAUST author’s right while continuing our subscription to them. There are marketing campaigns, awareness sessions are planned, in addition to establishing Libguides to help researchers, in addition to manage offset pricing models.

  10. Role of library's subscription licenses in promoting open access to scientific research

    KAUST Repository

    Buck, Stephen

    2018-04-30

    This presentation, based on KAUST’’s experience to date, will attempt to explain the different ways of bringing Open Access models to scientific Publisher’s licenses. Our dual approach with offset pricing is to redirect subscription money to publishing money and embed green open access deposition terms in understandable language in our license agreements. Resolving the inherent complexities in open access publishing, repository depositions and offsetting models will save libraries money and also time wasted on tedious and unnecessary administration work. Researchers will also save their time with overall clarity and transparency. This will enable trust and, where mistakes are made, and there inevitably will be with untried models, we can learn from these mistakes and make better, more robust services with auto deposition of our articles to our repository fed by Publishers’ themselves. The plan is to cover all Publishers with OA license terms for KAUST author’s right while continuing our subscription to them. There are marketing campaigns, awareness sessions are planned, in addition to establishing Libguides to help researchers, in addition to manage offset pricing models.

  11. NPP service life management

    International Nuclear Information System (INIS)

    Elagin, Yu.P.

    2001-01-01

    Problems of NPP service life management and service life prolongation are reviewed. Methods for the prolongation of the French NPP service life are discussed, priority directions of nuclear block service life management in regard to aging in the context of the European program of investigation into the materials aging are identified. Questions of the provision of the 60 years service life of the Mihama 1 block (Japan) and decision of the problem of the control equipment aging in Great Britain are discussed. Situation with the prolongation of licenses on the NPP operation in the USA and Spain is considered [ru

  12. 78 FR 32945 - Amendments to Regulations Governing Ocean Transportation Intermediary Licensing and Financial...

    Science.gov (United States)

    2013-05-31

    ... may employ to carry on its business. The absence of a definition for ``principal'' where it refers to... services.'' 46 CFR Sec. 515.2(h)(5). The definition of ``advertisement'' is new along with a related new... their OTI principals) must include the OTI's name, license or registration number on all advertisements...

  13. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  14. An exploratory study of services marketing in global markets: major areas of inquiry for the health care services industry.

    Science.gov (United States)

    Young, S; Erdem, S A

    1996-01-01

    It has been stated that one of the major challenges for the international marketer is the design of an efficient strategy for marketing services to international markets. This paper reviews some of the issues associated with services marketing in global markets along with the basic variables of service industries. An exploratory assessment of the health care services industry results in a list composed of several inquiry areas which should be examined by multinational companies. It is hoped that the review of the issues raised in this paper provides a basis for decision making and further research.

  15. Nuclear facilities licensing

    International Nuclear Information System (INIS)

    Carvalho, A.J.M. de.

    1978-01-01

    The need for the adoption of a legal and normative system, defining objectives, pescriptions and the process of nuclear licensing and building of nuclear power plants in Brazil is enphasized. General rules for the development of this system are presented. The Brazilian rules on the matter are discussed. A general view of the German legal system for nuclear power plant licensing and the IAEA recommendations on the subject are finally presented. (A.L.S.L.) [pt

  16. To License or Not to License: An Examination of State Statutes Regarding Private Investigators and Digital Examiners

    Directory of Open Access Journals (Sweden)

    Thomas Lonardo

    2008-09-01

    Full Text Available In this paper the authors examine statutes that regulate, license, and enforce investigative functions in each US state. After identification and review of Private Investigator licensing requirements, the authors find that very few state statutes explicitly differentiate between Private Investigators and Digital Examiners. After contacting all state agencies the authors present a distinct grouping organizing state approaches to professional Digital Examiner licensing. The authors conclude that states must differentiate between Private Investigator and Digital Examiner licensing requirements and oversight.

  17. Free preconceptual screening examination service in rural areas of Hubei Province, China in 2012.

    Science.gov (United States)

    Li, Cui-ling; Zhao, Kai; Li, Hui; Farah, Omar Ibrahim; Wang, Jiao-jiao; Sun, Rong-ze; Zhang, Hui-ping

    2014-01-01

    This work aims to collect and summarize the outcomes on free preconceptual screening examination in rural areas of Hubei Province in 2012. Moreover, this review promotes further understanding of the status of this activity to provide the Family Planning Commission valid scientific data upon which to construct effective policies. Couples, who complied with the family planning policy and were the residents in agricultural areas or lived in a local rural area for more than six months, were encouraged to participate in the free preconceptual screening examination service provided by the Hubei Provincial Population and Family Planning Commission. This service included 19 screening tests. All the data, including forms, manuals, and test results, were collected from 1 January 2012 to 31 December 2012 in rural areas in Hubei Province. A total of 497,860 individuals participated in the free preconceptual screening examination service, with a coverage rate of 97.1%. 4.0% and 4.8% of the participants exhibited with abnormal blood levels of ALT and creatinine, respectively; 0.36% of the participants tested positive for syphilis; 0.44% and 3.6% of the female participants tested positive for Neisseria gonorrhoeae and Chlamydia trachomatis, respectively; and 0.84% and 1.8% of the female participants tested positive for cytomegalovirus (IgM) and Toxoplasma gondii (IgM), respectively. After risk assessment, 59,935 participants might have high-risk of adverse pregnancy outcomes. In 2012, the prevalence of birth defects among the parturient who participated in the preconceptual screening examination service was 0.04%, while the prevalence was 0.08% among those who did not participate in the service. Preconceptual screening examination service may help to address the risk factors that can lead to adverse pregnancy outcome. More studies on the relationship between preconceptual screening examination service and prevalence of birth defect or other adverse pregnancy outcomes should be

  18. Quality of community basic medical service utilization in urban and suburban areas in Shanghai from 2009 to 2014.

    Directory of Open Access Journals (Sweden)

    Lijun Guo

    Full Text Available Urban areas usually display better health care services than rural areas, but data about suburban areas in China are lacking. Hence, this cross-sectional study compared the utilization of community basic medical services in Shanghai urban and suburban areas between 2009 and 2014. These data were used to improve the efficiency of community health service utilization and to provide a reference for solving the main health problems of the residents in urban and suburban areas of Shanghai. Using a two-stage random sampling method, questionnaires were completed by 73 community health service centers that were randomly selected from six districts that were also randomly selected from 17 counties in Shanghai. Descriptive statistics, principal component analysis, and forecast analysis were used to complete a gap analysis of basic health services utilization quality between urban and suburban areas. During the 6-year study period, there was an increasing trend toward greater efficiency of basic medical service provision, benefits of basic medical service provision, effectiveness of common chronic disease management, overall satisfaction of community residents, and two-way referral effects. In addition to the implementation effect of hypertension management and two-way referral, the remaining indicators showed a superior effect in urban areas compared with the suburbs (P<0.001. In addition, among the seven principal components, four principal component scores were better in urban areas than in suburban areas (P = <0.001, 0.004, 0.036, and 0.022. The urban comprehensive score also exceeded that of the suburbs (P<0.001. In summary, over the 6-year period, there was a rapidly increasing trend in basic medical service utilization. Comprehensive satisfaction clearly improved as well. Nevertheless, there was an imbalance in health service utilization between urban and suburban areas. There is a need for the health administrative department to address this

  19. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  20. 77 FR 71404 - Notice of Intent to License Government-Owned Inventions; Intent to License on a Partially...

    Science.gov (United States)

    2012-11-30

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent to License Government-Owned Inventions; Intent to License on a Partially-Exclusive Basis AGENCY: Department of the Army, DoD. ACTION... by the Secretary of the Army. The US Army Edgewood Chemical Biological Center intends to license...

  1. Use of demand for and spatial flow of ecosystem services to identify priority areas

    NARCIS (Netherlands)

    Verhagen, Willem; Kukkala, Aija S.; Moilanen, Atte; van Teeffelen, Astrid J.A.; Verburg, Peter H.

    2017-01-01

    Policies and research increasingly focus on the protection of ecosystem services (ESs) through priority-area conservation. Priority areas for ESs should be identified based on ES capacity and ES demand and account for the connections between areas of ES capacity and demand (flow) resulting in areas

  2. Licensing of ''grandfather's'' facilities: Ukrainian experience

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Bogdan, L.; Steinberg, N.

    1995-01-01

    In the former USSR, unlike most countries, radioactive waste management activities including waste disposal needed no license. But after the USSR breakdown the Ukrainian Parliament -- Verkhovna Rada -- invoked the revised Law on Business activities. According to Article 4 of the Law, in order to treat or to dispose radioactive waste every enterprise has to get a special permission or license. In compliance with the Law, the Cabinet of Ministers by its Ordinance of January 13, 1993, authorized the Ukrainian State Committee for Nuclear and Radiation Safety (UkrSCNRS) to issue special permissions or licenses for waste treatment and disposal. And that requirement was valid not only for future activities but also for existing facilities in operation. Taking into account the undergoing legislative process, SCNRS began to develop its licensing process without waiting for the special nuclear laws to be passed. On the basis of the legislation already in effect, first of all the Law on Enterprises (full responsibility of enterprises for their activities) and Law on Business activities (requirement to have a license for special types of activities), the newly formed national regulatory body had to identify all the enterprises that needed to be licensed, to establish relevant procedures, to develop related regulatory documents, to implement these procedures and documents at operating enterprises, and for each case to make a decision concerning feasibility of issuing a license, period of validity and license conditions

  3. Review process for license renewal applications

    International Nuclear Information System (INIS)

    Craig, John W.; Kuo, P.T.

    1991-01-01

    In preparation for license renewal reviews, the Nuclear Regulatory Commission has recently published for public review and comment a proposed rule for license renewal and a draft Standard Review Plan as well as a draft Regulatory Guide relating to the implementation of the proposed rule. In support of future license renewal applications, the nuclear industry has also submitted 11 industry reports for NRC review and approval. This paper briefly describe how these parallel regulatory and industry activities will be factored into the NRC review process for license renewal. (author)

  4. 10 CFR 781.51 - Nonexclusive licenses.

    Science.gov (United States)

    2010-01-01

    ... corporate structure of which licensee is a part, if any. However, the license shall not be assignable or... license upon the policies of the United States Government; (3) The effect of the license upon domestic and... extent of U.S. Government contribution to the development of the invention; (iv) The degree of...

  5. 7 CFR 6.33 - License fee.

    Science.gov (United States)

    2010-01-01

    ... certified mail, return receipt requested, advising the licensee that if payment is not mailed in accordance.... Where the license at issue is a historical license, this will result, pursuant to § 6.23(b), in the person's loss of historical eligibility for such license. (d) Licensees may elect not to accept certain...

  6. Financial incentives for return of service in underserved areas: a systematic review

    Directory of Open Access Journals (Sweden)

    Bärnighausen Till

    2009-05-01

    Full Text Available Abstract Background In many geographic regions, both in developing and in developed countries, the number of health workers is insufficient to achieve population health goals. Financial incentives for return of service are intended to alleviate health worker shortages: A (future health worker enters into a contract to work for a number of years in an underserved area in exchange for a financial pay-off. Methods We carried out systematic literature searches of PubMed, the Excerpta Medica database, the Cumulative Index to Nursing and Allied Health Literature, and the National Health Services Economic Evaluation Database for studies evaluating outcomes of financial-incentive programs published up to February 2009. To identify articles for review, we combined three search themes (health workers or students, underserved areas, and financial incentives. In the initial search, we identified 10,495 unique articles, 10,302 of which were excluded based on their titles or abstracts. We conducted full-text reviews of the remaining 193 articles and of 26 additional articles identified in reference lists or by colleagues. Forty-three articles were included in the final review. We extracted from these articles information on the financial-incentive programs (name, location, period of operation, objectives, target groups, definition of underserved area, financial incentives and obligation and information on the individual studies (authors, publication dates, types of study outcomes, study design, sample criteria and sample size, data sources, outcome measures and study findings, conclusions, and methodological limitations. We reviewed program results (descriptions of recruitment, retention, and participant satisfaction, program effects (effectiveness in influencing health workers to provide care, to remain, and to be satisfied with work and personal life in underserved areas, and program impacts (effectiveness in influencing health systems and health outcomes

  7. 42 CFR 440.50 - Physicians' services and medical and surgical services of a dentist.

    Science.gov (United States)

    2010-10-01

    ... or osteopathy as defined by State law; and (2) By or under the personal supervision of an individual licensed under State law to practice medicine or osteopathy. (b) “Medical and surgical services of a...

  8. 25 CFR 11.601 - Marriage licenses.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Marriage licenses. 11.601 Section 11.601 Indians BUREAU... ORDER CODE Domestic Relations § 11.601 Marriage licenses. A marriage license shall be issued by the clerk of the court in the absence of any showing that the proposed marriage would be invalid under any...

  9. 47 CFR 25.217 - Default service rules.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Default service rules. 25.217 Section 25.217 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS... licenses to operate a satellite system in a frequency band granted after a domestic frequency allocation...

  10. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1991-04-01

    The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC [Nuclear Regulatory Commission] licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor

  11. 47 CFR 25.222 - Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 10.95-11.2 GHz...

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Blanket Licensing provisions for Earth Stations...) frequency band, operating with Geostationary Orbit (GSO) Satellites in the Fixed-Satellite Service. 25.222 Section 25.222 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES...

  12. Decay heat removal plan of the SNR-300: a licensed concept

    International Nuclear Information System (INIS)

    Morgenstern, F.H.; Gyr, W.; Stoetzel, H.; Vossebrecker, H.

    1976-01-01

    The report describes how the decay heat removal plan of the SNR-300 has been established in 3 essential licensing steps, thus giving a very significant example for the slow but steady progress in the overall licensing process of the plant. (1) Introduction of an ECCS in addition to the 3 main heat transfer chains as a back-up for rather unlikely and undefined occurrences, 1970; (2) Experimental and computational demonstration of a reliable functioning of the in-vessel natural convection of the fluid flow, 1974; and (3) Proof of fulfilling the general safety and specific reliability criteria for the overall decay heat removal plan; i.e., the 3 main heat transfer chains with specific installations on the steam/water system side and the ECCS, 1976. Some special problem areas, for instance the cavity concept provided for the pipe fracture accident, have still to be licensed, but they do not contribute considerably to the overall risk

  13. The optimal licensing contract in a differentiated Stackelberg model.

    Science.gov (United States)

    Hong, Xianpei; Yang, Lijun; Zhang, Huaige; Zhao, Dan

    2014-01-01

    This paper extends the work of Wang (2002) by considering a differentiated Stackelberg model, when the leader firm is an inside innovator and licenses its new technology by three options, that is, fixed-fee licensing, royalty licensing, and two-part tariff licensing. The main contributions and conclusions of this paper are threefold. First of all, this paper derives a very different result from Wang (2002). We show that, with a nondrastic innovation, royalty licensing is always better than fixed-fee licensing for the innovator; with a drastic innovation, royalty licensing is superior to fixed-fee licensing for small values of substitution coefficient d; however when d becomes closer to 1, neither fee nor royalty licensing will occur. Secondly, this paper shows that the innovator is always better off in case of two-part tariff licensing than fixed-fee licensing no matter what the innovation size is. Thirdly, the innovator always prefers to license its nondrastic innovation by means of a two-part tariff instead of licensing by means of a royalty; however, with a drastic innovation, the optimal licensing strategy can be either a two-part tariff or a royalty, depending upon the differentiation of the goods.

  14. Nuclear proliferation and civilian nuclear power. Report of the Nonproliferation Alternative Systems Assessment Program. Volume VI. Safety and environmental considerations for licensing

    International Nuclear Information System (INIS)

    1980-06-01

    This volume of the Nonproliferation Alternative Systems Assessment Program report addresses safety and environmental considerations in licensing the principal alternative nuclear reactors and fuel cycles in the United States for large-scale commercial nuclear power plants. In addition, this volume examines the safety and environmental considerations for licensing fuel service centers. These centers, which have been proposed for controlling sensitive fuel-cycle facilities and special nuclear materials, would contain a combination of such facilities as reprocessing plants, fabrication plants, and reactors. For this analysis, two fuel service center concepts were selected - one with power - generating capability and one without

  15. Licensing procedures according to the Federal Act Protection Against Nuisances

    International Nuclear Information System (INIS)

    Schaefer, K.

    1977-01-01

    On March 1st, 1977 the 9th decree of the Protection Against Nuisances came into force, which, as the first comprehensive and state-uniform regulation contains the principles of the licensing procedure supplementary to legal provisions. The legal provision is based on numerous recent regulations of procedure from which in the meantime an essential stock of regulations relating to the licensing procedure has emerged. In general, two aims are to be achieved by this new regulation: The acceleration and simplification of the licensing procedure as will as the imperative guaranteeing in this procedure of the rights of the neighbouring areas, and of the society in general by a constitutional state. The legal provision provides in part new legal instruments for this. Examples on which the legal provisions are based are presented in the introduction. Subsequent explanations of provisions of the decree are to assist the application of the new act. Relevant regulations of the Federal Act for Protection Against Nuisances, as well as further supplementary provisions are given in the supplement. (orig.) [de

  16. The work of the OECD Nuclear Energy Agency on safety and licensing of nuclear installations

    International Nuclear Information System (INIS)

    Strohl, P.

    1975-01-01

    The acceleration of nuclear power programmes in OECD Member countries is reflected in the emphasis given by OECD/NEA to its activities in nuclear safety and regulatory matters. Particular effort is devoted to work on radiation protection and radioactive waste management, safety of nuclear installations and nuclear law development. A Committee on the Safety of Nuclear Installations reviews the state of the art and identifies areas for research and co-ordination of national programmes. A Sub-Committee on Licensing collates information and data on licensing standards and practices of different countries with a view to considering problems of common interest. Comparative studies of various licensing systems and discussions between licensing authorities should help to improve regulatory control of nuclear installations for which there appears to be a need for internationally accepted standards in the long run. (author)

  17. Climate Change Impacts on Ecosystem Services in High Mountain Areas: A Literature Review

    Directory of Open Access Journals (Sweden)

    Ignacio Palomo

    2017-05-01

    Full Text Available High mountain areas are experiencing some of the earliest and greatest impacts of climate change. However, knowledge on how climate change impacts multiple ecosystem services that benefit different stakeholder groups remains scattered in the literature. This article presents a review of the literature on climate change impacts on ecosystem services benefiting local communities and tourists in high mountain areas. Results show a lack of studies focused on the global South, especially where there are tropical glaciers, which are likely to be the first to disappear. Climate change impacts can be classified as impacts on food and feed, water availability, natural hazards regulation, spirituality and cultural identity, aesthetics, and recreation. In turn, climate change impacts on infrastructure and accessibility also affect ecosystem services. Several of these impacts are a direct threat to the lives of mountain peoples, their livelihoods and their culture. Mountain tourism is experiencing abrupt changes too. The magnitude of impacts make it necessary to strengthen measures to adapt to climate change in high mountain areas.

  18. Ecosystem services in European protected areas: Ambiguity in the views of scientists and managers?

    Directory of Open Access Journals (Sweden)

    Christiaan Hummel

    Full Text Available Protected Areas are a key component of nature conservation. They can play an important role in counterbalancing the impacts of ecosystem degradation. For an optimal protection of a Protected Area it is essential to account for the variables underlying the major Ecosystem Services an area delivers, and the threats upon them. Here we show that the perception of these important variables differs markedly between scientists and managers of Protected Areas in mountains and transitional waters. Scientists emphasise variables of abiotic and biotic nature, whereas managers highlight socio-economic, cultural and anthropogenic variables. This indicates fundamental differences in perception. To be able to better protect an area it would be advisable to bring the perception of scientists and managers closer together. Intensified and harmonised communication across disciplinary and professional boundaries will be needed to implement and improve Ecosystem Service oriented management strategies in current and future Protected Areas.

  19. Ecosystem services in European protected areas: Ambiguity in the views of scientists and managers?

    Science.gov (United States)

    Provenzale, Antonello; van der Meer, Jaap; Wijnhoven, Sander; Nolte, Arno; Poursanidis, Dimitris; Janss, Guyonne; Jurek, Matthias; Andresen, Magnus; Poulin, Brigitte; Kobler, Johannes; Beierkuhnlein, Carl; Honrado, João; Razinkovas, Arturas; Stritih, Ana; Bargmann, Tessa; Ziemba, Alex; Bonet-García, Francisco; Adamescu, Mihai Cristian; Janssen, Gerard; Hummel, Herman

    2017-01-01

    Protected Areas are a key component of nature conservation. They can play an important role in counterbalancing the impacts of ecosystem degradation. For an optimal protection of a Protected Area it is essential to account for the variables underlying the major Ecosystem Services an area delivers, and the threats upon them. Here we show that the perception of these important variables differs markedly between scientists and managers of Protected Areas in mountains and transitional waters. Scientists emphasise variables of abiotic and biotic nature, whereas managers highlight socio-economic, cultural and anthropogenic variables. This indicates fundamental differences in perception. To be able to better protect an area it would be advisable to bring the perception of scientists and managers closer together. Intensified and harmonised communication across disciplinary and professional boundaries will be needed to implement and improve Ecosystem Service oriented management strategies in current and future Protected Areas. PMID:29140983

  20. Ecosystem services in European protected areas: Ambiguity in the views of scientists and managers?

    Science.gov (United States)

    Hummel, Christiaan; Provenzale, Antonello; van der Meer, Jaap; Wijnhoven, Sander; Nolte, Arno; Poursanidis, Dimitris; Janss, Guyonne; Jurek, Matthias; Andresen, Magnus; Poulin, Brigitte; Kobler, Johannes; Beierkuhnlein, Carl; Honrado, João; Razinkovas, Arturas; Stritih, Ana; Bargmann, Tessa; Ziemba, Alex; Bonet-García, Francisco; Adamescu, Mihai Cristian; Janssen, Gerard; Hummel, Herman

    2017-01-01

    Protected Areas are a key component of nature conservation. They can play an important role in counterbalancing the impacts of ecosystem degradation. For an optimal protection of a Protected Area it is essential to account for the variables underlying the major Ecosystem Services an area delivers, and the threats upon them. Here we show that the perception of these important variables differs markedly between scientists and managers of Protected Areas in mountains and transitional waters. Scientists emphasise variables of abiotic and biotic nature, whereas managers highlight socio-economic, cultural and anthropogenic variables. This indicates fundamental differences in perception. To be able to better protect an area it would be advisable to bring the perception of scientists and managers closer together. Intensified and harmonised communication across disciplinary and professional boundaries will be needed to implement and improve Ecosystem Service oriented management strategies in current and future Protected Areas.

  1. Spatial planning for a green economy: National-level hydrologic ecosystem services priority areas for Gabon.

    Science.gov (United States)

    Goldstein, Joshua Howard; Tallis, Heather; Cole, Aaron; Schill, Steven; Martin, Erik; Heiner, Michael; Paiz, Marie-Claire; Aldous, Allison; Apse, Colin; Nickel, Barry

    2017-01-01

    Rapidly developing countries contain both the bulk of intact natural areas and biodiversity, and the greatest untapped natural resource stocks, placing them at the forefront of "green" economic development opportunities. However, most lack scientific tools to create development plans that account for biodiversity and ecosystem services, diminishing the real potential to be sustainable. Existing methods focus on biodiversity and carbon priority areas across large geographies (e.g., countries, states/provinces), leaving out essential services associated with water supplies, among others. These hydrologic ecosystem services (HES) are especially absent from methods applied at large geographies and in data-limited contexts. Here, we present a novel, spatially explicit, and relatively simple methodology to identify countrywide HES priority areas. We applied our methodology to the Gabonese Republic, a country undergoing a major economic transformation under a governmental commitment to balance conservation and development goals. We present the first national-scale maps of HES priority areas across Gabon for erosion control, nutrient retention, and groundwater recharge. Priority sub-watersheds covered 44% of the country's extent. Only 3% of the country was identified as a priority area for all HES simultaneously, highlighting the need to conserve different areas for each different hydrologic service. While spatial tradeoffs occur amongst HES, we identified synergies with two other conservation values, given that 66% of HES priority areas intersect regions of above average area-weighted (by sub-watersheds) total forest carbon stocks and 38% intersect with terrestrial national parks. Considering implications for development, we identified HES priority areas overlapping current or proposed major roads, forestry concessions, and active mining concessions, highlighting the need for proactive planning for avoidance areas and compensatory offsets to mitigate potential conflicts

  2. Spatial planning for a green economy: National-level hydrologic ecosystem services priority areas for Gabon.

    Directory of Open Access Journals (Sweden)

    Joshua Howard Goldstein

    Full Text Available Rapidly developing countries contain both the bulk of intact natural areas and biodiversity, and the greatest untapped natural resource stocks, placing them at the forefront of "green" economic development opportunities. However, most lack scientific tools to create development plans that account for biodiversity and ecosystem services, diminishing the real potential to be sustainable. Existing methods focus on biodiversity and carbon priority areas across large geographies (e.g., countries, states/provinces, leaving out essential services associated with water supplies, among others. These hydrologic ecosystem services (HES are especially absent from methods applied at large geographies and in data-limited contexts. Here, we present a novel, spatially explicit, and relatively simple methodology to identify countrywide HES priority areas. We applied our methodology to the Gabonese Republic, a country undergoing a major economic transformation under a governmental commitment to balance conservation and development goals. We present the first national-scale maps of HES priority areas across Gabon for erosion control, nutrient retention, and groundwater recharge. Priority sub-watersheds covered 44% of the country's extent. Only 3% of the country was identified as a priority area for all HES simultaneously, highlighting the need to conserve different areas for each different hydrologic service. While spatial tradeoffs occur amongst HES, we identified synergies with two other conservation values, given that 66% of HES priority areas intersect regions of above average area-weighted (by sub-watersheds total forest carbon stocks and 38% intersect with terrestrial national parks. Considering implications for development, we identified HES priority areas overlapping current or proposed major roads, forestry concessions, and active mining concessions, highlighting the need for proactive planning for avoidance areas and compensatory offsets to mitigate

  3. Licensing procedures and registration of medical doctors in the European Union.

    Science.gov (United States)

    Kovacs, Eszter; Schmidt, Andrea E; Szocska, Gabor; Busse, Reinhard; McKee, Martin; Legido-Quigley, Helena

    2014-06-01

    The current proposals to update the European Union (EU) directive on professional qualifications will have potentially important implications for health professions. Yet those discussing it will struggle to find basic information on key issues such as licensing and registration of physicians in different countries. A survey was conducted among national experts in 14 EU member states, supplemented by literature and independent expert review. The questionnaire covered five components of licensing and registration: (1) definitions, (2) regulatory basis, (3) governance, (4) the process of registration and (5) flow and quantity of applications. We identify seven areas of concern: (1) the meaning of terminology, which is inconsistent; (2) the role of language assessments and the responsibility for them; (3) whether approval to practise should be lifelong or time limited, subject to periodic assessment; (4) the need for improved systems to identify those deemed no longer fit to practise in one member state; (5) the complexity of processes for graduates from non-EU/European Economic Area (EAA) countries; (6) public access to registers; and (7) transparency of systems of governance. The systems of licensing and registration of doctors in Europe have developed within specific national contexts and vary widely. This creates inevitable problems in the context of free movement of professionals and increasing mobility. © 2014 Royal College of Physicians.

  4. Ecosystem services in a peri-urban protected area in Cyprus: a rapid appraisal

    Directory of Open Access Journals (Sweden)

    Paraskevi Manolaki

    2017-10-01

    Full Text Available Protected areas around the world are increasingly being recognized for their potential to protect various ecosystem services in addition to biodiversity. We carried out an ecosystem services (ES assessment at the Rizoelia National Forest Park, a biodiversity hotspot in Cyprus. For ES assessment we used TESSA v.1.1 and an ES matrix-approach to map the capacity of habitat types in the area. According to TESSA the most important ES provided by the study area are aesthetic benefits, recreation/ tourism, biodiversity, global climate regulation, and environmental education. Total Carbon stock was estimated to 14247.327 tonnes and the total number of annual visits was 14471. There were no statistically significant differences in the number of visits among visitation periods but there were statistically significant differences among National Holidays, Weekends and Weekdays. We identified that plantations had the highest capacity for most groups of services particularly where their understory comprises semi-natural habitat types rich in biodiversity. This is the first study in Cyprus which provides a preliminary quantification of ES in a protected area context using widely employed tools. The paper discusses how these findings can help decision-makers to plan direct future restoration and management actions to the benefit of a wide range of stakeholders.

  5. DOPA, a Digital Observatory for Protected Areas including Monitoring and Forecasting Services

    Science.gov (United States)

    Dubois, Gregoire; Hartley, Andrew; Peedell, Stephen; de Jesus, Jorge; Ó Tuama, Éamonn; Cottam, Andrew; May, Ian; Fisher, Ian; Nativi, Stefano; Bertrand, Francis

    2010-05-01

    The Digital Observatory for Protected Areas (DOPA) is a biodiversity information system currently developed as an interoperable web service at the Joint Research Centre of the European Commission in collaboration with other international organizations, including GBIF, UNEP-WCMC, Birdlife International and RSPB. DOPA is designed to assess the state and pressure of Protected Areas (PAs) and to prioritize them accordingly, in order to support decision making and fund allocation processes. To become an operational web service allowing the automatic monitoring of protected areas, DOPA needs to be able to capture the dynamics of spatio-temporal changes in habitats and anthropogenic pressure on PAs as well as the changes in the species distributions. Because some of the most valuable natural ecosystems and species on the planet cover large areas making field monitoring methods very difficult for a large scale assessment, the automatic collection and processing of remote sensing data are processes at the heart of the problem. To further be able to forecast changes due to climate change, DOPA has to rely on an architecture that enables it to communicate with the appropriate modeling web services. The purpose of this presentation is to present the architecture of the DOPA with special attention to e-Habitat, its web processing service designed for assessing the irreplaceability of habitats as well as for the modeling of habitats under different climate change scenarios. The use of open standards for spatial data and of open source programming languages for the development of the core functionalities of the system are expected to encourage the participation of the scientific community beyond the current partnerships and to favour the sharing of such an observatory which could be installed at any other location. Acknowledgement: Part of this work is funded under the 7th Framework Programme by the EuroGEOSS (www.eurogeoss.eu) project of the European Commission. The views

  6. The Optimal Licensing Contract in a Differentiated Stackelberg Model

    Directory of Open Access Journals (Sweden)

    Xianpei Hong

    2014-01-01

    Full Text Available This paper extends the work of Wang (2002 by considering a differentiated Stackelberg model, when the leader firm is an inside innovator and licenses its new technology by three options, that is, fixed-fee licensing, royalty licensing, and two-part tariff licensing. The main contributions and conclusions of this paper are threefold. First of all, this paper derives a very different result from Wang (2002. We show that, with a nondrastic innovation, royalty licensing is always better than fixed-fee licensing for the innovator; with a drastic innovation, royalty licensing is superior to fixed-fee licensing for small values of substitution coefficient d; however when d becomes closer to 1, neither fee nor royalty licensing will occur. Secondly, this paper shows that the innovator is always better off in case of two-part tariff licensing than fixed-fee licensing no matter what the innovation size is. Thirdly, the innovator always prefers to license its nondrastic innovation by means of a two-part tariff instead of licensing by means of a royalty; however, with a drastic innovation, the optimal licensing strategy can be either a two-part tariff or a royalty, depending upon the differentiation of the goods.

  7. Licensing and advanced fuel designs

    International Nuclear Information System (INIS)

    Davidson, S.L.; Novendstern, E.H.

    1991-01-01

    For the past 15 years, Westinghouse has been actively involved in the development and licensing of fuel designs that contain major advanced features. These designs include the optimized fuel assembly, The VANTAGE 5 fuel assembly, the VANTAGE 5H, and most recently the VANTAGE+ fuel assembly. Each of these designs was supported by extensive experimental data, safety evaluations, and design efforts and required intensive interaction with the US Nuclear Regulatory Commission (NRC) during the review and approval process. This paper presents a description of the licensing approach and how it was utilized by the utilities to facilitate the licensing applications of the advanced fuel designs for their plants. The licensing approach described in this paper has been successfully applied to four major advanced fuel design changes ∼40 plant-specific applications, and >350 cycle-specific reloads in the past 15 years

  8. Nuclear licensing in Slovenia

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.; Vojnovic, D.; Pristavec, M.

    1998-01-01

    The article presents the approach to nuclear licensing in Slovenia. The paper describes, the initialization, internal authorization and review process in the Krsko NPP. The overall process includes preparation, internal independent evaluation, the Krsko Operating Committee and the Krsko Safety Committee review and internal approval. In addition, the continuation of the licensing process is discussed which includes independent evaluation by an authorized institution and a regulatory body approval process. This regulatory body approval process includes official hearing of the licensee, communication with the licensee, and final issuance of a license amendment. The internal evaluation, which follows the methodology of US NRC (defined in 10 CFR 50.59 and NUMARC 125) is described. This concept is partially implemented in domestic legislation.(author)

  9. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  10. Perspectives of self-direction: a systematic review of key areas contributing to service users' engagement and choice-making in self-directed disability services and supports.

    Science.gov (United States)

    Lakhani, Ali; McDonald, Donna; Zeeman, Heidi

    2018-05-01

    Self-directed disability support policies aim to encourage greater choice and control for service users in terms of the health and social care they receive. The proliferation of self-directed disability support policies throughout the developed world has resulted in a growing amount of research exploring the outcomes for service users, and their families and carers. Our understanding of the issues faced by people with disabilities, particularly how they make health and social care decisions and the key areas that determine their engagement with service providers within a self-directed environment is limited. A synthesis of research is timely and can provide knowledge for service users and health and social care support providers to ensure their successful participation. A systematic review guided by the PRISMA approach explored (i) the key areas determining service users' engagement with self-directed disability services and supports, and (ii) how service users make informed decisions about providers. In October 2014 and April 2016, three databases - MEDLINE, CINAHL and Web of Science - were searched for research and review articles. Eighteen sources met the search criteria. Findings were mapped into either: key areas determining service user engagement, or service users' informed decision-making. Findings concerning key areas determining engagement fell into three themes - personal responsibility for budgeting, personalised approaches, and a cultural shift in practice and delivery among service providers. Findings about decision-making yielded two themes - supporting informed decision-making and inhibiting informed decision-making. Literature suggests that self-directed models of care may provide service users with increased control over the services that they receive. Increased control for some service users and their families requires independent external decision-making support, particularly around the domains of budgeting, planning and hiring. Future research

  11. Nuclear proliferation and civilian nuclear power: report of the Nonproliferation Alternative Systems Assessment Program. Volume VI. Safety and environmental considerations for licensing

    International Nuclear Information System (INIS)

    1979-12-01

    Volume 6 of the Nonproliferation Alternative Systems Assessment Program report addresses safety and environmental considerations in licensing the principal alternative nuclear reactors and fuel cycles in the United States for large-scale commercial nuclear power plants. In addition, this volume examines the safety and environmental considerations for licensing fuel service centers. These centers, which have been proposed for controlling sensitive fuel-cycle facilities and special nuclear materials, would contain a combination of such facilities as reprocessing plants, fabrication plants, and reactors. For this analysis, two fuel service center concepts were selected - one with power-generating capability and one without. This volume also provides estimates of the time required for development of large-scale commercial reactor systems to reach the construction permit application stage and for fuel-cycle facilities to reach the operating license application stage, which is a measure of the relative technical status of alternative nuclear systems

  12. Periodic and in-service inspection programs

    International Nuclear Information System (INIS)

    Dinu, M.

    2000-01-01

    Periodic and in-service inspection programs for Cernavoda NPP consists of periodic inspections of CANDU NPP components CSAN N-285.4 and CSAN N-285.4, in-service inspections and repair and modifications general inspection. Periodic inspection program document (PIPD) determines the systems and components subject to inspection, the category of the inspection, techniques, areas and other details.The current status of the inspection programs is presented, including containment , erosion/corrosion, pressure vessel support and snubbers, main steam lines inspection programs. Qualification program in Cernavoda NPP involves equipment qualification in the on-site laboratory, yearly certification, special equipment qualification in the National Institute of Metrology. All procedures are approved by the ISCIR (regulatory body for pressure vessel and lifting equipment) and CNCAN (National Commission on Nuclear Activities Control). Qualification of the personnel is performed according to the ISCIR Technical prescription CR 11/82 for up to 3 year period. Final qualification and licensing is performed by CNCAN

  13. Development model to public hearing for environmental licensing of nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Vasques, Luciana Gomes; Aquino, Afonso Rodrigues de, E-mail: lu_vasques@usp.br, E-mail: araquino@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    The use of nuclear technology has always been a matter of concern from an environmental point of view. Although disputed, the generation of electricity in nuclear reactors was considered a source of clean emission in relation to emission of gases responsible for the greenhouse effect. In Brazil, nuclear activities are regulated and supervised by the Brazilian Commission of Nuclear Energy - CNEN. Environmental issues associated with nuclear activities are described by CONAMA, and the developments in this area are licensed by IBAMA, regardless of obtaining nuclear licenses issued by CNEN. Obtaining environmental licenses (prior, installation and operation) depends initially on preparing the Environmental Impact Study - EIS and the Environmental Impact Report - EIR, consisting of a presentation of EIS in language accessible to all. EIR is forwarded to bodies and entities with some connection to the enterprise, to be manifested with IBAMA about the relevance of its content. This information serves as a resource for Public Hearings, which are meetings organized by entrepreneurs, conducted by IBAMA, and rely on public participation, can be considered as a licensing step. Public Hearings are subject to subjectivity, and the model proposed in this research becomes more objective ill-defined, difficult to understand actions for the entrepreneur. (author)

  14. Development model to public hearing for environmental licensing of nuclear facilities

    International Nuclear Information System (INIS)

    Vasques, Luciana Gomes; Aquino, Afonso Rodrigues de

    2015-01-01

    The use of nuclear technology has always been a matter of concern from an environmental point of view. Although disputed, the generation of electricity in nuclear reactors was considered a source of clean emission in relation to emission of gases responsible for the greenhouse effect. In Brazil, nuclear activities are regulated and supervised by the Brazilian Commission of Nuclear Energy - CNEN. Environmental issues associated with nuclear activities are described by CONAMA, and the developments in this area are licensed by IBAMA, regardless of obtaining nuclear licenses issued by CNEN. Obtaining environmental licenses (prior, installation and operation) depends initially on preparing the Environmental Impact Study - EIS and the Environmental Impact Report - EIR, consisting of a presentation of EIS in language accessible to all. EIR is forwarded to bodies and entities with some connection to the enterprise, to be manifested with IBAMA about the relevance of its content. This information serves as a resource for Public Hearings, which are meetings organized by entrepreneurs, conducted by IBAMA, and rely on public participation, can be considered as a licensing step. Public Hearings are subject to subjectivity, and the model proposed in this research becomes more objective ill-defined, difficult to understand actions for the entrepreneur. (author)

  15. The Brazilian Audit Tribunal's role in improving the federal environmental licensing process

    International Nuclear Information System (INIS)

    Lima, Luiz Henrique; Magrini, Alessandra

    2010-01-01

    This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Audit Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.

  16. 47 CFR 25.262 - Licensing and domestic coordination requirements for 17/24 GHz BSS space stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing and domestic coordination requirements for 17/24 GHz BSS space stations. 25.262 Section 25.262 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Technical Standards § 25.262...

  17. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  18. A study for the review of export license through the NSG denial notification

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Sun Do; Yang, Seung Hyo [Korea Institute of Nuclear Nonproliferation and Control, Daejeon (Korea, Republic of)

    2012-10-15

    All NSG participating members that have rejected applications of export licenses for nuclear export control items within their respective countries must give notice of this to the point of contact at NSG. This is referred to as the Denial Notification, and each of the participating members must respect the denial notifications of the other member nations. When participating members seek to obtain approval for an export license that is essentially identical to the denial notification of other member nations, they must necessarily go through the process of prior discussion with the nation that gave the denial notification. Also, it is regulated that the export license must not be approved without the sufficient exchange of information. Thus, these records of denial notifications must be constantly checked and maintained as the latest updated information and these records must be utilized in related approval examinations. This study analyzes the denial notifications that have been recorded in the past 20 years and it describes the areas that must be mainly examined at the export and import licensing.

  19. Ecosystem services in European protected areas: Ambiguity in the views of scientists and managers?

    NARCIS (Netherlands)

    Hummel, C.; Provenzale, A.; Van der Meer, J.; Wijnhoven, S.; Nolte, A.; Poursanidis, D.; Janss, G.; Jurek, M.; Andresen, M.; Poulin, B.; Kobler, J.; Beierkuhnlein, C.; Honrado, J.; Razinkovas, A.; Stritih, A.; Bargmann, T.; Ziemba, A.; Bonet-García, F.; Adamescu, M.C.; Janssen, G.; Hummel, H.

    2017-01-01

    Protected Areas are a key component of nature conservation. They can play an important role in counterbalancing the impacts of ecosystem degradation. For an optimal protection of a Protected Area it is essential to account for the variables underlying the major Ecosystem Services an area delivers,

  20. Free preconceptual screening examination service in rural areas of Hubei Province, China in 2012.

    Directory of Open Access Journals (Sweden)

    Cui-ling Li

    Full Text Available OBJECTIVE: This work aims to collect and summarize the outcomes on free preconceptual screening examination in rural areas of Hubei Province in 2012. Moreover, this review promotes further understanding of the status of this activity to provide the Family Planning Commission valid scientific data upon which to construct effective policies. METHODS: Couples, who complied with the family planning policy and were the residents in agricultural areas or lived in a local rural area for more than six months, were encouraged to participate in the free preconceptual screening examination service provided by the Hubei Provincial Population and Family Planning Commission. This service included 19 screening tests. All the data, including forms, manuals, and test results, were collected from 1 January 2012 to 31 December 2012 in rural areas in Hubei Province. RESULTS: A total of 497,860 individuals participated in the free preconceptual screening examination service, with a coverage rate of 97.1%. 4.0% and 4.8% of the participants exhibited with abnormal blood levels of ALT and creatinine, respectively; 0.36% of the participants tested positive for syphilis; 0.44% and 3.6% of the female participants tested positive for Neisseria gonorrhoeae and Chlamydia trachomatis, respectively; and 0.84% and 1.8% of the female participants tested positive for cytomegalovirus (IgM and Toxoplasma gondii (IgM, respectively. After risk assessment, 59,935 participants might have high-risk of adverse pregnancy outcomes. In 2012, the prevalence of birth defects among the parturient who participated in the preconceptual screening examination service was 0.04%, while the prevalence was 0.08% among those who did not participate in the service. CONCLUSION: Preconceptual screening examination service may help to address the risk factors that can lead to adverse pregnancy outcome. More studies on the relationship between preconceptual screening examination service and prevalence of

  1. Savannah River Plant engineering and design history. Volume 4: 300/700 Areas & general services and facilities

    Energy Technology Data Exchange (ETDEWEB)

    1957-01-01

    The primary function of the 300 Area is the production and preparation of the fuel and target elements required for the 100 Area production reactors. Uranium slugs and lithium-aluminium alloy control and blanket rods are prepared in separate structures. Other facilities include a test pile, a physics assembly laboratory, an office and change house, an electrical substation, and various service facilities such as rail lines, roads, sewers, steam and water distribution lines, etc. The 700 Area contains housing and facilities for plant management, general plant services, and certain technical activities. The technical buildings include the Main Technical Laboratory, the Waste Concentration Building, the Health Physics Headquarters, and the Health Physics Calibration building. Sections of this report describe the following: development of the 300-M Area; selection and description of process; design of main facilities of the 300 Area; development of the 700-A Area; design of the main facilities of the 700 Area; and general services and facilities, including transportation, plant protection, waste disposal and drainage, site work, pilot plants, storage, and furniture and fixtures.

  2. Changing mobility patterns and road mortality among pre-license teens in a late licensing country : an epidemiological study.

    NARCIS (Netherlands)

    Twisk, D.A.M. Bos, N.M. Shope, J.T. & Kok, G.

    2013-01-01

    Whereas the safety of teens in early licensing countries has been extensively studied, little is known about the safety of pre-license teens in late licensing countries, where these teens also may be at risk. This risk exists because of the combination of a) increasing use of travel modes with a

  3. 78 FR 17450 - Notice of Issuance of Materials License Renewal, Operating License SUA-1341, Uranium One USA, Inc...

    Science.gov (United States)

    2013-03-21

    ... License Renewal, Operating License SUA-1341, Uranium One USA, Inc., Willow Creek Uranium In Situ Recovery.... SUA- 1341 to Uranium One USA, Inc. (Uranium One) for its Willow Creek Uranium In Situ Recovery (ISR... Commission License No. SUA-1341 For Uranium One USA, Inc., Irigaray and Christensen Ranch Projects (Willow...

  4. 78 FR 5840 - Notice of License Termination for University of Illinois Advanced TRIGA Reactor, License No. R-115

    Science.gov (United States)

    2013-01-28

    ... University of Illinois Advanced TRIGA Reactor, License No. R-115 The U.S. Nuclear Regulatory Commission (NRC) is noticing the termination of Facility Operating License No. R-115, for the University of Illinois... Operating License No. R-115 is terminated. The above referenced documents may be examined, and/or copied for...

  5. The role of service areas in the optimization of FSS orbital and frequency assignments

    Science.gov (United States)

    Levis, C. A.; Wang, C.-W.; Yamamura, Y.; Reilly, C. H.; Gonsalvez, D. J.

    1986-01-01

    An implicit relationship is derived which relates the topocentric separation of two satellites required for a given level of single-entry protection to the separation and orientation of their service areas. The results are presented explicitly for circular beams and topocentric angles. A computational approach is given for elliptical beams and for use with longitude and latitude variables. It is found that the geocentric separation depends primarily on the service area separation, secondarily on a parameter which characterizes the electrical design, and only slightly on the mean orbital position of the satellites. Both linear programming and mixed integer programming algorithms are implemented. Possible objective function choices are discussed, and explicit formulations are presented for the choice of the sum of the absolute deviations of the orbital locations from some prescribed 'ideal' location set. A test problem involving six service areas is examined with results that are encouraging with respect to applying the linear programming procedure to larger scenarios.

  6. Dry spent fuel storage licensing

    International Nuclear Information System (INIS)

    Sturz, F.C.

    1995-01-01

    In the US, at-reactor-site dry spent fuel storage in independent spent fuel storage installations (ISFSI) has become the principal option for utilities needing storage capacity outside of the reactor spent fuel pools. Delays in the geologic repository operational date at or beyond 2010, and the increasing uncertainty of the US Department of Energy's (DOE) being able to site and license a Monitored Retrievable Storage (MRS) facility by 1998 make at-reactor-site dry storage of spent nuclear fuel increasingly desirable to utilities and DOE to meet the need for additional spent fuel storage capacity until disposal, in a repository, is available. The past year has been another busy year for dry spent fuel storage licensing. The licensing staff has been reviewing 7 applications and 12 amendment requests, as well as participating in inspection-related activities. The authors have licensed, on a site-specific basis, a variety of dry technologies (cask, module, and vault). By using certified designs, site-specific licensing is no longer required. Another new cask has been certified. They have received one new application for cask certification and two amendments to a certified cask design. As they stand on the brink of receiving multiple applications from DOE for the MPC, they are preparing to meet the needs of this national program. With the range of technical and licensing options available to utilities, the authors believe that utilities can meet their need for additional spent fuel storage capacity for essentially all reactor sites through the next decade

  7. A meta-analytic review of moral licensing.

    Science.gov (United States)

    Blanken, Irene; van de Ven, Niels; Zeelenberg, Marcel

    2015-04-01

    Moral licensing refers to the effect that when people initially behave in a moral way, they are later more likely to display behaviors that are immoral, unethical, or otherwise problematic. We provide a state-of-the-art overview of moral licensing by conducting a meta-analysis of 91 studies (7,397 participants) that compare a licensing condition with a control condition. Based on this analysis, the magnitude of the moral licensing effect is estimated to be a Cohen's d of 0.31. We tested potential moderators and found that published studies tend to have larger moral licensing effects than unpublished studies. We found no empirical evidence for other moderators that were theorized to be of importance. The effect size estimate implies that studies require many more participants to draw solid conclusions about moral licensing and its possible moderators. © 2015 by the Society for Personality and Social Psychology, Inc.

  8. U.S. licensing process and ABWR certification

    International Nuclear Information System (INIS)

    Quirk, J.F.; Williams, W.A.

    1996-01-01

    Part 50 of Title 10 of the Code of Federal Regulation (CFR) establishes a two-step licensing process by which the U.S. Nuclear Regulatory Committee (NRC) authorizes nuclear reactor plant construction through issuance of a construction permit and authorizes operation by issuance of an operating license. At each stage, the NRC Staff conducts technical reviews and there is potential for public hearings. In 1989, the NRC issued a new, simplified licensing process: Part 52. The purpose of the Part 52 licensing process is to provide a regulatory framework that brings about earlier resolution of licensing issues. Because issues are not resolved early in the Part 50 licensing process, approval of an operating license is not assured until after a significant investment has been made in the plant. Part 52 increases the stability and certainty of the licensing process by providing for the early resolution of safety and environmental issues. The Part 52 licensing process features (1) early site permits, (2) design certification, and (3) combined construction permit and operating licenses. As part of the U.S. Advanced Light Water Reactor (ALWR) Program to revitalize the nuclear option through the integration of government/utility/industry efforts, GE undertook the role of applying for certification for its latest product line, the Advanced Boiling Water Reactor (ABWR), under the U.S. ABWR certification program. The ABWR design is an essentially complete plant. Initial application for design certification was in 1987 under Part 50. GE reapplied in late 1991 under the newly promulgated Part 52. Following seven years of intensive interactions with the NRC and ACRS, GE was awarded the first Final Design Approval (FDA) under Part 52. The Commission initiated rulemaking by publishing the proposed ABWR Certification Rule in the Federal Register in early 1995. Certification is anticipated mid-1996. (J.P.N.)

  9. PBMR-SA licensing project organization

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Metcalf, P.E.; Mysen, A.

    2001-01-01

    The South African nuclear regulatory authority, the Council for Nuclear Safety (CNS), is beginning the safety review of the Pebble Bed Modular Reactor (PBMR) design under development by the South African National Electrical Utility, Eskom. This paper describes the CNS licensing process, including the establishment of basic licensing criteria, general design criteria, and specific design rules, as well the safety assessment to be conducted in accordance with the established structure. It also summarises the CNS PBMR review project activities, including the overall organisational arrangements, licensing basis, safety and risk assessment, general operating rules and plant design engineering, and pre-operational testing. (author)

  10. Traveler information services in rural tourism areas : appendix A, tourist intercept surveys

    Science.gov (United States)

    2000-06-30

    This document presents documentation regarding tourist intercept surveys for traveler information services in rural areas. It documents data collection functions and information dissemination functions, and provides an interpretive description of tra...

  11. Licensing reform in the USA

    International Nuclear Information System (INIS)

    1991-01-01

    The licensing process for nuclear power plants in the USA is currently in two distinct stages: the issuance of a construction permit followed later by the issuance of an operation license. The ''two-step'' process has come under heavy criticism from the U.S. nuclear industry on the grounds that it causes uncertainty and delays and therefore inhibits new commitments to nuclear power plants. In 1989 the NRC published new regulations for the licensing of nuclear power plants which provide for the issuance of early site permits, safety certifications of standard designs, and combined construction permits and operating licences. The new rule was challenged by intervenors representing antinuclear groups who filed a legal challenge seeking to have the rule set aside on the grounds that it violates the Atomic Energy Act which they allege makes two-step licensing mandatory. In November 1990 the US Court of Appeals upheld the NRC's authority to issue combined licenses. An appeal for a rehearing has been filed. The paper analyses the events and the possible consequences of an adverse court decision. It reviews the options open to the NRC and industry if the court decision is upheld. The possibility of congressional action to amend the Atomic Energy Act is discussed. (author)

  12. An introduction to intellectual property licensing for technology companies

    Science.gov (United States)

    Meier, Lawrence H.

    2001-05-01

    Intellectual property licensing is an important issue facing all technology companies. Before entering into license agreements a number of issues need to be addressed, including invention ownership, obtaining and identifying licensable subject matter, and developing a licensing strategy. There are a number of important provisions that are included in most intellectual property license agreements. These provisions include definitions, the license grant, consideration, audit rights confidentiality, warranties, indemnification, and limitation of liability. Special licensing considerations exist relative to each type of intellectual property, and when the other party is a foreign company or a university.

  13. 75 FR 55799 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-09-14

    ... licensing. Licensing Contact: Patrick P. McCue, PhD, (301) 435-5560; [email protected] . Collaborative... Reference No. E-051-2010/0-US-01). Licensing Status: Available for licensing. Licensing Contact: Patrick P... for the brain tumors or brain cancers indentified as gliomas, glioblastomas, or astrocytomas. This...

  14. Current status of the PBMR licensing project

    International Nuclear Information System (INIS)

    Mysen, A.; Clapisson, G.A.; Metcalf, P.E.

    2000-01-01

    The CNS is currently reviewing the PBMR conceptual design from a licensibility point of view. The PBMR concept is based on a High Temperature Gas Cooled Reactor - pebble bed reactor type. It is anticipated that the PBMR design will rely on inherent safety characteristics to contain fission products within fuel over the full range of design basis events. This feature combined with the high temperature integrity of the fuel and structural graphite, allows the safe use of a high coolant temperature, which allows consideration of the future development of this reactor for non-electrical applications of nuclear heat for industrial use. The CNS licensing approach requires that the licensing and design basis of the plant should respect prevailing international norms and practices and that a quantitative risk assessment should demonstrate compliance with the CNS fundamental safety standards. The first stage of the licensing process is now ongoing; this is a pre-application phase, which will result in a statement on licensibility being issued. Identification of the specific documentation requirements and information needed is required across every step of the licensing process. Top level regulatory requirements have been established for the PBMR. They include the CNS fundamental safety standard and basic licensing criteria, which describes requirements on licensees of nuclear installations regarding risk assessment and compliance with the safety criteria and define classification of licensing basis events. (author)

  15. 77 FR 47393 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2012-08-08

    ...: Voluntary surrender of license. License No.: 12454N. Name: Federation Exports-Imports Inc. Address: 747...: Natco International Transports USA, L.L.C. Address: 12415 SW 136th Avenue, Bay 4, Miami, FL 33186 Date...: Voluntary surrender of license. License No.: 022773F. Name: WLI (USA) Inc. Address: 175-01 Rockaway Blvd...

  16. Gender Inequality in University Administration and Services

    OpenAIRE

    Estelles Miguel, Sofia; NAVARRO GARCÍA, ANTONIO; Palmer Gato, Marta Elena; Albarracín Guillem, José Miguel

    2014-01-01

    This work is licensed under a Creative Commons Attribution 3.0 License. This article addresses inequalities between men and women at work. Inequalities in job access and career progression are addressed. The article reviews literature on equal opportunities at work. A case study of administrative and services staff at a public university in Valencia (Spain) is then presented. The case study assesses the current reality of gender inequality in Spanish public institutions. Spanish public uni...

  17. License renewal - an idea whose time has come. Hatch nuclear plant license renewal program: an actual example of application of the license renewal rule to the Intake Structure

    International Nuclear Information System (INIS)

    Chandiwala, F.; Evans, W.P.

    1999-01-01

    After the NRC issued a revised license renewal rule in May 1995, the nuclear industry focussed on developing generic industry for implementing the rule and testing the guidance through various demonstration programs and work products in conjunction with the NRC. In addition, plant-specific programs also proceeded forward. These activities show that implementation issues continue to exist. Since the issuance of the rule, the NRC has issued a draft standard review plan for license renewal (SRP-LR), working draft, September 1997. Southern Nuclear Operating Company (SNC) has begun development work on a license renewal application for Plant Hatch Units 1 and 2. Plant Hatch Units 1 and 2 are BWR 4, Mark I plants whose operating licenses expire in 2014 and 2018, respectively. The Plant Hatch initiative also involves teaming with other boiling water reactors (BWRs) to develop the license renewal technology within the BWR fleet, and to support Plant Hatch by providing an oversight role for the application process. The teaming effort involved two other utilities, each being assigned to prepare a common report on a mechanical system or a structure. The common report could be presented to the NRC with modifications to suit the individual plants, thereby saving time and money, and hopefully resulting in quicker approval by the NRC. The desired license renewal process end result is a renewed license with up to a 20 year extension (10CFR 54.31(b)). (orig.)

  18. Utilization of health care services in rural and urban areas: a ...

    African Journals Online (AJOL)

    2014-06-02

    Jun 2, 2014 ... related problem, being consumer-oriented with diverse dimensions ... The order of importance of the factors is need, enabling, predisposing and health services. 11 variables .... influence utilization behavior, they have the advantage of reminding .... area and also from the researcher's personal knowledge.

  19. Licensing procedure for nuclear power in Sweden. An international look with lessons for Sweden

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2011-02-01

    In this study we present an in-depth analysis of the existing licensing procedure for nuclear power in Sweden, and the related processes towards different public authorities. In order to put the existing legislation into context we also analyze the legal and political prerequisites for the establishment of nuclear reactors during the 1970s. The purpose of this report is thus to: (a) analyze the legal and political conditions under which the existing nuclear power plants in Sweden were built; and (b) review and analyze the existing licensing procedure for nuclear power in the country. Four main statutes (and several subordinated regulations) apply in connection with the establishment of a new nuclear plant in Sweden, including the adoption of physical plans, a principal governmental decision on the permissibility of the plant and at least five major licenses. Physical planning according to the Planning and Building Act is primarily a municipal responsibility. A plan has to meet certain environmental requirements; not least the 'provisions on efficient management of natural resources' in the Environmental Code, indicating how different kinds of land and water areas should be used and thereby direct the location of different installations. The Swedish rules are complex and vague in many respects, and may therefore imply major uncertainties for a prospective investor. The legal protection is less unclear if an area is of national interest for a specific purpose, such as nature conservation, where it normally would not be possible to locate, say, a nuclear power plant. An area may also be of national interest for nuclear plants, which of course significantly alters the preconditions in favour of the plant project. The physical planning procedure comprises an 'environmental consideration' of the plan, including an 'environmental impact assessment' (EIA), provided the plan is likely to have significant effects on the environment. This 'programmatic EIA' does however not

  20. 14 CFR 1245.108 - License to contractor.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  1. License protection with a tamper-resistant token

    NARCIS (Netherlands)

    Chong, C.N.; Ren, Bin; Doumen, J.M.; Etalle, Sandro; Hartel, Pieter H.; Corin, R.J.; Lim, Chae Hoon; Yung, Moti

    Content protection mechanisms are intended to enforce the usage rights on the content. These usage rights are carried by a license. Sometimes, a license even carries the key that is used to unlock the protected content. Unfortunately, license protection is difficult, yet it is important for digital

  2. Availability and Utilization of Anganwadi Services in an Adopted Urban Area of Wardha

    Directory of Open Access Journals (Sweden)

    Bhagat VM

    2016-01-01

    Full Text Available Background - The ICDS is world’s largest community-based child nutrition and development programme aimed at holistic development of children (0-6 years, expectant and nursing mothers through the Anganwadi centers (AWC. Improvement in nutritional and health status of their beneficiaries to prevent morbidities and mortalities due to malnutrition is one of the important objectives of ICDS. Objectives: To determine the availability and extent of utilization of AWC services by the beneficiaries, and to study factors influencing utilization and reasons for non/under utilization. Methodology: A community based cross-sectional study conducted in three well defined adopted urban field practice areas of a rural tertiary health care facility in Wardha, Maharashtra. A cluster comprising of 40 households was identified in each area to provide 140 study participants. Epi-info-3.7.1 for univariate and SYSTAT-12 used for multivariate analysis. Results: Overall 89.29% of beneficiaries utilized one or more services of AWC. Working women and those with lower socio-economic status had significantly and independently lower/non utilization of AWC services. Conclusions: Most of the study participants were aware and utilized the services of AWC. Among the women not utilizing the services; the reasons for non-utilization need to be addressed for optimal utilization of AWCs.

  3. Welfare service in rural areas

    DEFF Research Database (Denmark)

    Nørgaard, Helle

    Many rural municipalities are challenged due to overall population decline and demographic changes and thus need to make adjustment to municipal services. Demographic profiles are central for assessing both needs, place bound resources and development potential of individual localities.Assessment......Many rural municipalities are challenged due to overall population decline and demographic changes and thus need to make adjustment to municipal services. Demographic profiles are central for assessing both needs, place bound resources and development potential of individual localities.......Assessment of development potential for individual localities using a place-based approach is in line with EU policies for rural development thereby setting a competitive framework for local development. This paper addresses place bound approaches in relation to service adjustment and discusses how local resources...... and place bound potentials are identified and how they are addressed in plans for future development. The paper draws on a study on service adjustments in rural municipalities in Denmark examining how service adjustments e.g. closing of local schools are decided, how they are managed by rural communities...

  4. Trends in CANDU licensing

    International Nuclear Information System (INIS)

    Snell, V.G.; Grant, S.D.

    1997-01-01

    Modern utilities view nuclear power more and more as a commodity - it must compete 'today' with current alternatives to attract their investment. With its long construction times and large capital investment, nuclear plants are vulnerable to delays once they have been committed. There are two related issues. Where the purchaser and the regulator are experienced in CANDU, the thrust is a very practical one: to identify and resolve major licensing risks at a very early stage in the project. Thus for a Canadian project, the designer (AECL) and the prospective purchaser would deal directly with the AECB. However CANDU has also been successfully licensed in other countries, including Korea, Romania, Argentina, India and Pakistan. Each of these countries has its own regulatory agency responsible for licensing the plant. In addition, however, the foreign customer and regulator may seek input from the AECB, up to and including a statement of licensability in Canada; this is not normally needed for a ''repeat'' plant and/or if the customer is experienced in CANDU, but can be requested if the plant configuration has been modified significantly from an already-operating CANDU. It is thus the responsibility of the designer to initiate early discussions with the AECB so the foreign CANDU meets the expectations of its customers

  5. 47 CFR 97.5 - Station license required.

    Science.gov (United States)

    2010-10-01

    .... (3) A military recreation station license grant. A military recreation station license grant may be... States military recreational premises where the station is situated. The person must not be a... the balance of the license term and the suspension is still in effect, suspended for the balance of...

  6. 24 CFR 3286.203 - Installation license required.

    Science.gov (United States)

    2010-04-01

    ... performance of the installation work in compliance with the requirements of this part. (3) A license is not required for individuals working as direct employees of a licensed installer or for the company that... and competent performance of all employees working under the licensed installer's supervision and for...

  7. Non-Power Reactor Operator Licensing Examiner Standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR Part 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, this standard will be revised periodically to accommodate comments and reflect new information or experience

  8. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power license renewal in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. (author)

  9. 76 FR 31307 - Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively

    Science.gov (United States)

    2011-05-31

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively AGENCY: Department of the Army, DoD. ACTION: Notice. SUMMARY: The... Army. The US Army Edgewood Chemical Biological Center and the US Army Research Laboratory intend to...

  10. Decommissioning of the nuclear licensed facilities at the Fontenay aux Roses CEA Center; cleanup of nuclear licensed facility 57 and monitoring of operations and operating feedback

    International Nuclear Information System (INIS)

    Estivie, D.; Bohar, M.P.; Jeanjacques, M.; Binet, C.; Bremond, M.P.; Poyau, C.; Mandard, L.; Boissonneau, J.F.; Fouquereau, A.; Pichereau, E.

    2008-01-01

    This is a summary of the program for the decommissioning of all the CEA Licensed Nuclear Facilities in Fontenay aux Roses. The particularity of this center is now it is located in a built-up area. It is presented like example the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. It was developed a method applied to establish the multi-annual budget, monitor the progress of operations and integrate, as work continues, the operating feedback. (author)

  11. USDA Forest Service Roadless Areas: Potential Biodiversity Conservation Reserves

    Directory of Open Access Journals (Sweden)

    Colby Loucks

    2003-12-01

    Full Text Available In January 2001, approximately 23 x 106 ha of land in the U.S. National Forest System were slated to remain roadless and protected from timber extraction under the Final Roadless Conservation Rule. We examined the potential contributions of these areas to the conservation of biodiversity. Using GIS, we analyzed the concordance of inventoried roadless areas (IRAs with ecoregion-scale biological importance and endangered and imperiled species distributions on a scale of 1:24,000. We found that more than 25% of IRAs are located in globally or regionally outstanding ecoregions and that 77% of inventoried roadless areas have the potential to conserve threatened, endangered, or imperiled species. IRAs would increase the conservation reserve network containing these species by 156%. We further illustrate the conservation potential of IRAs by highlighting their contribution to the conservation of the grizzly bear (Ursos arctos, a wide-ranging carnivore. The area created by the addition of IRAs to the existing system of conservation reserves shows a strong concordance with grizzly bear recovery zones and habitat range. Based on these findings, we conclude that IRAs belonging to the U.S. Forest Service are one of the most important biotic areas in the nation, and that their status as roadless areas could have lasting and far-reaching effects for biodiversity conservation.

  12. 47 CFR 25.136 - Licensing provisions for user transceivers in the 1.6/2.4 GHz, 1.5/1.6 GHz, and 2 GHz Mobile...

    Science.gov (United States)

    2010-10-01

    ...) Incorporation of ancillary terrestrial component base station into an L-band mobile-satellite service system... ancillary terrestrial component (ATC) base stations as defined in § 25.201 at its own risk and subject to... Applications and Licenses Earth Stations § 25.136 Licensing provisions for user transceivers in the 1.6/2.4 GHz...

  13. 45 CFR 61.7 - Reporting licensure actions taken by Federal or State licensing and certification agencies.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Reporting licensure actions taken by Federal or State licensing and certification agencies. 61.7 Section 61.7 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION HEALTHCARE INTEGRITY AND PROTECTION DATA BANK FOR FINAL ADVERSE...

  14. 9 CFR 2.6 - Annual license fees.

    Science.gov (United States)

    2010-01-01

    ... method used to calculate the license fee. All initial license and changed class of license fees must be... research facilities, dealers, exhibitors, retail pet stores, and persons for use as pets, directly or through an auction sale, by the dealer or applicant during his or her preceding business year (calendar or...

  15. May compact storage facilities be licensed

    International Nuclear Information System (INIS)

    Gleim, A.; Winter, G.

    1980-01-01

    The authors examine as potential statements fo fact for licensing so-called compact storage facilities for spent fuel elements Sec. 6 to 9c of the German Atomic Energy Act and Sec. 4 of the German Radiation Protection Ordinance. They find that none of these provisions were applicable to compact stroage facilities. In particular, the storage of spent fuel elements was no storage of nuclear fuels licensable under Sec. 6 of the Atomic Energy Act, because Sec. 6 did not cover spent fuel elements. Also in the other wording of the Atomic Energy Act there was no provision, which could be used as a statement of fact for licensing compact storage facilities. Such facilities could not be licensed and, for that reason, were not permitted. (IVR) [de

  16. Environmental law in Brazil: analysis of environmental licensing of wind power plants in permanently preserved areas; Direito ambiental no Brasil: analise do licenciamento ambiental de usinas eolicas de preservacao permante

    Energy Technology Data Exchange (ETDEWEB)

    Amaral, Cristiano Abijaode; Pedreira, Adriana Coli; Bleil, Julia Rechia [Associacao Brasileira dos Investidores em Autoproducao de Energia (ABIAPE), Brasilia, DF (Brazil)], E-mails: cristiano@abiape.com.br, adriana@abiape.com.br, julia@abiape.com.br

    2011-04-15

    The Brazilian electric energy matrix is mostly renewable. According to the Generation Information Base (BIG) of the Brazilian Electricity Regulatory Agency (ANEEL), hydroelectricity is responsible for 67.31% of the country's energy. The additional generation comes mostly from fossil fuels, whose use is questioned when it comes to environmental quality and climate change. Despite its abundance, hydroelectric power generation has physical, socioeconomic and environmental limitations. Thus, it is essential to develop alternative technologies, providing security in the supply of electric energy and the maintenance of a clean matrix. Among the alternative technologies available, wind power is the one that has been gaining prominence, domestically and internationally speaking. In the last auction of renewable sources held in August 2010 in Brazil, the energy produced by the plants of sugarcane bagasse (biomass) was traded at an average of R$ 144.20 MWh; wind energy, which was the cheapest, was traded at R$ 130.86, and the energy from small hydropower plants (PCH), at R$ 141.93 MWh. The wind power plants accounted for 70% of the auction, which resulted in a plan for increasing its installed capacity by fivefold, by the year 2013. Brazil has great potential to be explored (estimated 143,000 MW), yet despite being appealing, wind energy still face some challenges. One of them is due to the fact that most potential areas for such energy are found in permanently preservation areas and areas considered national assets, subject to special protection measures. This study aims to investigate whether the regulatory, legal and environmental issues are considered an obstacle to an effective inclusion of wind power generation in Brazil. The study examines the process of environmental licensing of wind power plants, especially those established in permanently preservation areas (APPs) and Coastal Areas. The research methodology consisted of normative framework, judicial decisions

  17. 47 CFR 25.226 - Blanket licensing provisions for domestic, U.S. Vehicle-Mounted Earth Stations (VMESs) receiving...

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Blanket licensing provisions for domestic, U.S... GHz (Earth-to-space) frequency band, operating with Geostationary Satellites in the Fixed-Satellite Service. 25.226 Section 25.226 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON...

  18. License Auctions with Royalty Contracts for (Winners and) Losers

    OpenAIRE

    Wolfstetter, Elmar; Giebe, Thomas

    2007-01-01

    This paper revisits the licensing of a non–drastic process innovation by an outside innovator to a Cournot oligopoly. We propose a new mechanism that combines a restrictive license auction with royalty licensing. This mechanism is more profitable than standard license auctions, auctioning royalty contracts, fixed–fee licensing, pure royalty licensing, and two-part tariffs. The key features are that royalty contracts are auctioned and that losers of the auction are granted the option to si...

  19. 76 FR 17840 - Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively

    Science.gov (United States)

    2011-03-31

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively AGENCY: Department of the Army, DoD. ACTION: Notice. SUMMARY: The... McGill telephone: 410-436-8467, [email protected]us.army.mil , U.S. Army Edgewood Chemical Biological Center...

  20. RM - ODP to express nuclear licensing

    International Nuclear Information System (INIS)

    Barbosa, E.A.; Martucci, M. Jr.

    2002-01-01

    The scope of CNEN (Comissao Nacional de Energia Nuclear) is established by standards and procedures, which allow one context where several activities for nuclear licensing are realized by persons, machines and other entities of real world and by software systems. The CNEN objectives for licensing nuclear installations can be specified and they define how the systems are consisted, its nature, and which important elements were considered relevant for its constitution. The behavior, where the software will be operated, was likely defined in this paper through all aspects of its business process, which means from its licensing context. The concepts and definition showed here defined one specifics business domain, through ODP context. The functionalities of nuclear licensing process, the relationship scope and the rules of interaction that contributed for to specify the nuclear licensing process were defined, too. Therefore, the definition of the domain follows the orientation of architecture concepts and allows to implement the reflection model, where, with the auxiliary from IDEF0 (Integration Definition for Function Modeling) diagrams, the interactions between extern domains were mapped

  1. License - Gclust Server | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Gclust Server License License to Use This Database Last updated : 2009/09/14 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  2. Sodium Fast Reactor Safety and Licensing Research Plan

    International Nuclear Information System (INIS)

    Denman, M.; Lachance, J.; Sofu, T.; Bari, R.; Flanagon, G.; Wigeland, R.

    2015-01-01

    This paper summarizes potential research priorities for the US Department of Energy (DOE) with the intent of improving the licensability of the sodium cooled fast reactor (SFR). In support of this project, five panels were tasked with identifying potential safety related gaps in the available information, data and models needed to support the licensing of an SFR. The areas examined were sodium technology; accident sequences and initiators; source term characterization, codes and methods; and fuels and materials. It is the intent of this paper to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the applied technology access control designation from old documents. The second cross-cutting gap is the need for a robust knowledge management and preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with applied technology and knowledge management. (author)

  3. Assessment of the Ecosystem Services Capacity in Natural Protected Areas for Biodiversity Conservation

    Science.gov (United States)

    Ronchi, Silvia; Salata, Stefano

    2017-10-01

    Recently, in Italy, a legislative proposal has been set to reform the role and the functions of natural protected areas promoting their aggregation (or the abolition) pursuing a better efficiency for their administration and economic saving. The system of natural protected areas is composed of different conservation levels: there are the Natural parks, established in the ‘80 by national or regional institution for the safeguard of natural elements, the Natura 2000 -Habitat 92/43/CEE promoted by European Union, with conservation measures for maintaining or restoring habitats and species of Communitarian interest, and the local parks of supra-municipal interest (namely PLIS) created by single municipalities or their aggregation aimed at limiting the soil sealing process. The hierarchical level of protection has determined differences in the management of the areas which leads to various approaches and strategies for biodiversity conservation and integrity. In order to assess strengths and weaknesses of the legislative initiative, the new management framework should be designed, considering the ecosystem characteristics of each natural protected area to define the future opportunities and critics, rather than, in the extreme case, remove the level of protection due to the absence of valuable ecosystem conditions. The paper provides an operative support to better apply the legislative proposal investigating the dynamics that affect all protected areas using the land take process as a major threat to biodiversity conservation in natural zones. The land take process is explored using the Land Use Change analysis (LUCa) as a possible way to determine the impact and the environmental effects of land transitions. LUCa is also useful to determine the loss of protected zones capacity to support Ecosystem Services. Finally, the assessment of the Ecosystem Services Capacity (ESC) index expresses the ability of each LULC to provide ES and, in particular, the Ecological

  4. Estimation and Evaluation of Future Demand and Supply of Healthcare Services Based on a Patient Access Area Model

    Directory of Open Access Journals (Sweden)

    Shunsuke Doi

    2017-11-01

    Full Text Available Accessibility to healthcare service providers, the quantity, and the quality of them are important for national health. In this study, we focused on geographic accessibility to estimate and evaluate future demand and supply of healthcare services. We constructed a simulation model called the patient access area model (PAAM, which simulates patients’ access time to healthcare service institutions using a geographic information system (GIS. Using this model, to evaluate the balance of future healthcare services demand and supply in small areas, we estimated the number of inpatients every five years in each area and compared it with the number of hospital beds within a one-hour drive from each area. In an experiment with the Tokyo metropolitan area as a target area, when we assumed hospital bed availability to be 80%, it was predicted that over 78,000 inpatients would not receive inpatient care in 2030. However, this number would decrease if we lowered the rate of inpatient care by 10% and the average length of the hospital stay. Using this model, recommendations can be made regarding what action should be undertaken and by when to prevent a dramatic increase in healthcare demand. This method can help plan the geographical resource allocation in healthcare services for healthcare policy.

  5. Assessment of pharmacists' delivery of public health services in rural and urban areas in Iowa and North Dakota.

    Science.gov (United States)

    Scott, David M; Strand, Mark; Undem, Teri; Anderson, Gabrielle; Clarens, Andrea; Liu, Xiyuan

    2016-01-01

    The profession of pharmacy is expanding its involvement in public health, but few studies have examined pharmacists' delivery of public health services. To assess Iowa and North Dakota pharmacists' practices, frequency of public health service delivery, level of involvement in achieving the essential services of public health, and barriers to expansion of public health services in rural and urban areas. This study implemented an on-line survey sent to all pharmacists currently practicing pharmacy in Iowa and North Dakota. Overall, 602 valid responses were analyzed, 297 in rural areas and 305 in urban areas. Three practice settings (chain stores [169, 28.2%], independent community pharmacies [162, 27.0%], and hospital pharmacies [156, 26.0%]) comprised 81.2% of the sample. Both chain and independent community pharmacists were more commonly located in rural areas than in urban areas (PDakota. These findings should be interpreted to be primarily due to differences in the role of the rural pharmacist and the quest for certain opportunities that rural pharmacists are seeking.

  6. International assistance. Licensing assistance project

    International Nuclear Information System (INIS)

    Aleev, A.

    1999-01-01

    Description of licensing assistance project for VATESI is presented. In licensing of unit No.1 of INPP VATESI is supported by many western countries. Experts from regulatory bodies or scientific organizations of those countries assist VATESI staff in reviewing documentation presented by INPP. Among bilateral cooperation support is provided by European Commission through Phare programme

  7. [Organization of occupational therapeutic service, dynamics and structure of occupational morbidity in Krasnoyarsk area].

    Science.gov (United States)

    Tereshchenko, Iu A; Zakharinskaia, O N

    2010-01-01

    The authors present organizational and functional structure of occupational therapeutic service in Krasnoyarsk area, major functional divisions of the territorial occupational therapeutic center and their activities. The article covers analysis of changes in levels and structure of occupational morbidity, defines main ways to optimize occupational therapeutic service for the territorial workers.

  8. Technical issues in licensing low-level radioactive waste facilities

    Energy Technology Data Exchange (ETDEWEB)

    Junkert, R. [California Dept. of Health Services, CA (United States)

    1993-03-01

    The California Department of Health Service spent two years in the review of an application for a low-level radioactive waste disposal facility in California. During this review period a variety of technical issues had to be evaluated and resolved. One of the first issues was the applicability and use of NRC guidance documents for the development of LLW disposal facilities. Other technical issues that required intensive evaluations included surface water hydrology, seismic investigation, field and numerical analysis of the unsaturated zone, including a water infiltration test. Source term verification became an issue because of one specific isotope that comprised more than 90% of the curies projected for disposal during the operational period. The use of trench liners and the proposed monitoring of the unsaturated zone were reviewed by a highly select panel of experts to provide guidance on the need for liners and to ensure that the monitoring system was capable of monitoring sufficient representative areas for radionuclides in the soil, soil gas, and soil moisture. Finally, concerns about the quality of the preoperational environmental monitoring program, including data, sample collection procedures, laboratory analysis, data review and interpretation and duration of monitoring caused a significant delay in completing the licensing review.

  9. 77 FR 9678 - Prospective Grant of Exclusive License: The Development of Human Anti-CD22 Monoclonal Antibodies...

    Science.gov (United States)

    2012-02-17

    .../patent applications for the technology family, to Sanomab, Ltd. The patent rights in these inventions... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Prospective Grant of Exclusive License: The Development of Human Anti-CD22 Monoclonal Antibodies for the Treatment of Human...

  10. 77 FR 41792 - Prospective Grant of Co-Exclusive License: The Development of Human Anti-CD22 Monoclonal...

    Science.gov (United States)

    2012-07-16

    ... applications for the technology family, to Customized Therapeutics. The patent rights in these inventions have... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Prospective Grant of Co-Exclusive License: The Development of Human Anti-CD22 Monoclonal Antibodies for the Treatment of Human...

  11. NRC licensing requirements: DOD options

    International Nuclear Information System (INIS)

    Pike, W.J.; O'Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with 90 Sr or 238 Pu; radioisotopic dynamic electric generators with 90 Sr or 238 Pu; and applications of radioisotopes for luminous sources (lights) with 3 H, 85 Kr, or 147 Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process

  12. Overview of the Yucca Mountain Licensing Process

    International Nuclear Information System (INIS)

    M. Wisenburg

    2004-01-01

    This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process

  13. 47 CFR 25.134 - Licensing provisions of Very Small Aperture Terminal (VSAT) and C-band Small Aperture Terminal...

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing provisions of Very Small Aperture Terminal (VSAT) and C-band Small Aperture Terminal (CSAT) networks. 25.134 Section 25.134 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS...

  14. Cyclotron facilities in Brazil: Current status and licensing aspects

    International Nuclear Information System (INIS)

    Facure, A.; Carvalho, S.M.; Di Prinzio, R.; Silveira, C.S.; Gasparian, P.B.R.; Franca, W.F.

    2017-01-01

    Positron Emission Tomography (PET) is a highly sensitive and accurate nuclear medicine imaging technology but the major problem of this technique is the use of radioisotopes with short half-life, less than two hours. The production and selling of short half-life radioisotopes used to be monopoly of the Brazilian Government. In 2006, a Constitutional Amendment revoked the state monopoly due to the need for the use of short half-life radioisotopes in nuclear medicine centers very far from the government production facilities. The aim of this study is to describe the current status of short half-life radioisotopes production in Brazil and discuss some licensing process. In Brazil, as has been occurring worldwide, the number of nuclear medicine centers is increasing. Currently there are 123 services performing PET scans in Brazil. There are 14 cyclotrons operating in Brazil. The type of licensing process conducted in Brazil does not take into account the population density of each state, with a free competition model being adopted. Because of this there is a lot of equipment concentrated in the Southeast and no cyclotrons operating in the Northern part of the country. One of the biggest obstacles during the licensing process is the designation of qualified personnel as operation workers and radiation safety officers. The number of cyclotron accelerators and PET/CT equipment increased in recent years. However, a number of external factors such as the distance from the nuclear medicine centers, and qualified personnel have proved crucial for the economic viability of this type of facility. (author)

  15. Cyclotron facilities in Brazil: Current status and licensing aspects

    Energy Technology Data Exchange (ETDEWEB)

    Facure, A.; Carvalho, S.M.; Di Prinzio, R.; Silveira, C.S.; Gasparian, P.B.R.; Franca, W.F., E-mail: facure@cnen.gov.br [Comissao Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil)

    2017-09-01

    Positron Emission Tomography (PET) is a highly sensitive and accurate nuclear medicine imaging technology but the major problem of this technique is the use of radioisotopes with short half-life, less than two hours. The production and selling of short half-life radioisotopes used to be monopoly of the Brazilian Government. In 2006, a Constitutional Amendment revoked the state monopoly due to the need for the use of short half-life radioisotopes in nuclear medicine centers very far from the government production facilities. The aim of this study is to describe the current status of short half-life radioisotopes production in Brazil and discuss some licensing process. In Brazil, as has been occurring worldwide, the number of nuclear medicine centers is increasing. Currently there are 123 services performing PET scans in Brazil. There are 14 cyclotrons operating in Brazil. The type of licensing process conducted in Brazil does not take into account the population density of each state, with a free competition model being adopted. Because of this there is a lot of equipment concentrated in the Southeast and no cyclotrons operating in the Northern part of the country. One of the biggest obstacles during the licensing process is the designation of qualified personnel as operation workers and radiation safety officers. The number of cyclotron accelerators and PET/CT equipment increased in recent years. However, a number of external factors such as the distance from the nuclear medicine centers, and qualified personnel have proved crucial for the economic viability of this type of facility. (author)

  16. Area-socioeconomic disparities in mental health service use among children involved in the child welfare system.

    Science.gov (United States)

    Kim, Minseop; Garcia, Antonio R; Yang, Shuyan; Jung, Nahri

    2018-06-01

    Relying on data from a nationally representative sample of youth involved in the child welfare system (CWS) in 1999-2000 (the National Survey of Child and Adolescent Well-Being, Cohort 1) and 2008-2009 (Cohort 2), this study implemented a diverse set of disparity indicators to estimate area-socioeconomic disparities in mental health (MH) services use and changes in area-socioeconomic disparities between the two cohorts. Our study found that there are area-socioeconomic disparities in MH service use, indicating that the rates of MH service use among youth referred to the CWS differ by area-socioeconomic positions defined by county-level poverty rates. We also found that area-socioeconomic disparities increased over time. However, the magnitude of the increase varied widely across disparity measures, suggesting that there are different conclusions about the trend and magnitude of area-socioeconomic disparities, depending upon which disparity measures are implemented. A greater understanding of the methodological differences among disparity measures is warranted, which will in turn impact how interventions are designed to reduce socioeconomic disparities among children in the CWS. Copyright © 2018. Published by Elsevier Ltd.

  17. Teacher License Reciprocity. 50-State Review

    Science.gov (United States)

    Aragon, Stephanie

    2017-01-01

    This policy report defines and provides a 50-state review of teacher license reciprocity, explores how state-specific licensing requirements impact the teacher labor market, and includes examples of national and state efforts to facilitate reciprocity.

  18. Clustering Vehicle Temporal and Spatial Travel Behavior Using License Plate Recognition Data

    OpenAIRE

    Huiyu Chen; Chao Yang; Xiangdong Xu

    2017-01-01

    Understanding travel patterns of vehicle can support the planning and design of better services. In addition, vehicle clustering can improve management efficiency through more targeted access to groups of interest and facilitate planning by more specific survey design. This paper clustered 854,712 vehicles in a week using K-means clustering algorithm based on license plate recognition (LPR) data obtained in Shenzhen, China. Firstly, several travel characteristics related to temporal and spati...

  19. SAFSTOR and License Renewal: Making Them Coexist

    International Nuclear Information System (INIS)

    Henries, William PE

    2008-01-01

    The Indian Point Energy Center is located on the eastern shore of the Hudson River in the town of Buchanan, New York. It lies approximately thirty miles north of New York City, and thus, holds the distinction of being the closest nuclear facility to a major metropolitan area. Units 1 and 2 were constructed and operated by Consolidated Edison and Unit 3 was owned and operated by the New York State Power Authority. All three units are now owned and operated by Entergy Nuclear- Northeast. Indian Point Unit 1 was powered by a pressurized water reactor which operated with an authorized maximum steady state power level of 615 thermal megawatts until October 31, 1974. On June 19, 1980, the Commission issued an order revoking authority to operate the facility. Although 244 spent fuel assemblies were successfully shipped offsite to a spent fuel reprocessing facility, 160 assemblies remain in the Unit 1 spent fuel pool awaiting relocation to dry cask storage. Units 2 and 3 are also pressurized water reactors which each produce slightly in excess of 1,000 MWe. Since 1974, Unit 1 has been maintained in a Safe Store Mode (SAFSTOR). For the purposes of this document, the term 'SAFSTOR' is intended to mean 'Custodial SAFSTOR' as described in section 2.4.3 of NUREG 0586 (Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities (GEIS) as follows: 'Custodial SAFSTOR requires a minimum cleanup and decontamination effort initially, followed by a period of continuing care with the active protection systems (principally the ventilation system) kept in service throughout the storage period. Full-time onsite surveillance by operating and security forces is required to carry out radiation monitoring, to maintain the equipment, and to prevent accidental or deliberate intrusion into the facility and the subsequent exposure to radiation or the disposal of radioactivity beyond the confines of the facility'. The decision to enter SAFSTOR was based upon the immediate

  20. Female health workers at the doorstep: a pilot of community-based maternal, newborn, and child health service delivery in northern Nigeria.

    Science.gov (United States)

    Uzondu, Charles A; Doctor, Henry V; Findley, Sally E; Afenyadu, Godwin Y; Ager, Alastair

    2015-03-01

    Nigeria has one of the highest maternal mortality ratios in the world. Poor health outcomes are linked to weak health infrastructure, barriers to service access, and consequent low rates of service utilization. In the northern state of Jigawa, a pilot study was conducted to explore the feasibility of deploying resident female Community Health Extension Workers (CHEWs) to rural areas to provide essential maternal, newborn, and child health services. Between February and August 2011, a quasi-experimental design compared service utilization in the pilot community of Kadawawa, which deployed female resident CHEWs to provide health post services, 24/7 emergency access, and home visits, with the control community of Kafin Baka. In addition, we analyzed data from the preceding year in Kadawawa, and also compared service utilization data in Kadawawa from 2008-2010 (before introduction of the pilot) with data from 2011-2013 (during and after the pilot) to gauge sustainability of the model. Following deployment of female CHEWs to Kadawawa in 2011, there was more than a 500% increase in rates of health post visits compared with 2010, from about 1.5 monthly visits per 100 population to about 8 monthly visits per 100. Health post visit rates were between 1.4 and 5.5 times higher in the intervention community than in the control community. Monthly antenatal care coverage in Kadawawa during the pilot period ranged from 11.9% to 21.3%, up from 0.9% to 5.8% in the preceding year. Coverage in Kafin Baka ranged from 0% to 3%. Facility-based deliveries by a skilled birth attendant more than doubled in Kadawawa compared with the preceding year (105 vs. 43 deliveries total, respectively). There was evidence of sustainability of these changes over the 2 subsequent years. Community-based service delivery through a resident female community health worker can increase health service utilization in rural, hard-to-reach areas. © Uzondu et al. This is an open-access article distributed under

  1. Traveler information services in rural tourism areas : appendix C, observations at tourist interactions with kiosks

    Science.gov (United States)

    2000-06-30

    This report presents a series of observations of tourists' experiences with kiosks providing traveler information services at rural tourism areas. The kiosks were assessed in five areas: reliability visibility, usability, usefulness, and adaptability...

  2. Personal dosimetry service of VF, a.s. company

    International Nuclear Information System (INIS)

    Prasek, P.

    2009-01-01

    The VF, a.s. Company will extend its services in the area of personal dosimetry at the end of 2008, which is fully in compliance with the requirements of the Atomic Act, section 9 paragraph (1) letter r) and Decree on Radiation Protection, section 59 paragraph (1) letter a). Optically stimulated luminescence was selected in VF .a.s. as the most advantageous and the most advanced technology for the integral personal dosimetry. Optically stimulated luminescence (OSL) has been using in dosimetry for more than ten years. Although it is relatively new technology , its indisputable advantages predetermine that technology has significantly benefited in personal dosimetry services within a short time all over the advanced world. The VF, a.s. personal dosimetry service is based on the licensed products of LANDAUER, the US company, which is the world leader in OSL dosimetry. Crystalline Al 2 O 3 :C was selected as the detection material. All equipment of personal dosimetry service is installed in the VF Centre of Technology in Cerna Hora. The personal dosimetry service is incorporated in the International LANDAUER Dosimetry Service Network, and in the European Union, it is directly linked to the LANDAUER European Headquarters with its office in Paris. As a part of the OSL technology licence, the VF personal dosimetry service was included in the inter-laboratory comparison programme of the LANDAUER syndicate. (author)

  3. Personal dosimetry service of VF, a.s. company

    International Nuclear Information System (INIS)

    Prasek, P.

    2008-01-01

    The VF, a.s. Company will extend its services in the area of personal dosimetry at the end of 2008, which is fully in compliance with the requirements of the Atomic Act, section 9 paragraph (1) letter r) and Decree on Radiation Protection, section 59 paragraph (1) letter a). Optically stimulated luminescence was selected in VF .a.s. as the most advantageous and the most advanced technology for the integral personal dosimetry . Optically stimulated luminescence (OSL) has been using in dosimetry for more than ten years. Although it is relatively new technology , its indisputable advantages predetermine that technology has significantly benefited in personal dosimetry services within a short time all over the advanced world. The VF, a.s. personal dosimetry service is based on the licensed products of LANDAUER, the US company, which is the world leader in OSL dosimetry. Crystalline Al 2 O 3 :C was selected as the detection material. All equipment of personal dosimetry service is installed in the VF Centre of Technology in Cerna Hora. The personal dosimetry service is incorporated in the International LANDAUER Dosimetry Service Network, and in the European Union, it is directly linked to the LANDAUER European Headquarters with its office in Paris. As a part of the OSL technology licence, the VF personal dosimetry service was included in the inter-laboratory comparison programme of the LANDAUER syndicate. (author)

  4. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal (LR) for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power LR in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. The reactor LRGDs referenced in this poster can all be accessed at http://www.nrc.gov/reactors/operating/licensing/renewal/guidance.html (author)

  5. Four Essays on Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    &D strategies. On the supply side, the existing literature has been focused on understanding how technology licensing can be used by firms as a mechanism to recover investments in innovative activities and to foster learning opportunities. On the demand side, it has been shown that licensing is an important...... source that firms can tap into to feed their internal needs for innovative knowledge. While several studies have examined technology licensing through the lens of the licensor, research on how firms rely on licensing contracts to acquire knowledge and improve their innovation performance still leaves......Licensing contracts represent one of the most widely used mechanisms to exchange technologies and transfer know-how between firms. Due to the opportunities that licensing creates for firms operating on both sides of the markets for technology, it has increasingly become an integral part of firms’ R...

  6. Analysis of the quality of wastewater from the service stations located in the operative area of Helsinki Region Environmental Services Authority

    OpenAIRE

    Dahal, Karna

    2012-01-01

    The objective of this thesis was to analyse the data of pollutant parameters for waste water from the service stations situated in the operative area of the Viikinmäki and Suomenoja WWTPs in the Helsinki Region Environmental Services Authority (HSY). The main reason for this analysis was that HSY wanted to know about the quality of waste water discharged from the service stations into the influent of its WWTPs. The number of cars used in Finland is increasing day by day; hence, au...

  7. A review of tritium licensing requirements

    International Nuclear Information System (INIS)

    Meikle, A.B.

    1982-12-01

    Present Canadian regulations and anticipated changes to these regulations relevant to the utilization of tritium in fusion facilities and in commercial applications have been reviewed. It is concluded that there are no serious licensing obstacles, but there are a number of requirements which must be met. A license will be required from Atomic Energy Control Board if Ontario Hydro tritium is to be applied by other users. A license is required from the Federal Government to export or import tritium. A licensed container will be required for the storage and shipping of tritium. The containers being designed by AECL and Ontario Hydro and which are currently being tested will adequately store and ship all of the Ontario Hydro tritium but are unnecessarily large for the small quantities required by the commercial tritium users. Also, some users may prefer to receive tritium in gaseous form. An additional, smaller container should be considered. The licensing of overseas fusion facilities for the use of tritium is seen as a major undertaking offering opportunities to Canadian Fusion Fuels Technology Project to undertake health, safety and environmental analysis on behalf of these facilities

  8. Treatment of wastewater from service areas at motorways

    Directory of Open Access Journals (Sweden)

    Makowska Małgorzata

    2016-12-01

    Full Text Available This paper deals with wastewater treatment systems placed in motorway service areas (MSAs. In the years 2008-2009 eight of such facilities installed on the stretch of the A2 motorway between Poznań and Nowy Tomyśl were examined and analyzed. The system consists of a septic tank, a submerged aerated biofilter and an outflow filter. The volume of traffic on the highway was analyzed, the amount of water use was measured and peak factors were calculated. On this basis it was concluded that the inflows to the wastewater treatment systems in many cases exceeded the nominal design values.

  9. Software licenses: Stay honest!

    CERN Multimedia

    Computer Security Team

    2012-01-01

    Do you recall our article about copyright violation in the last issue of the CERN Bulletin, “Music, videos and the risk for CERN”? Now let’s be more precise. “Violating copyright” not only means the illegal download of music and videos, it also applies to software packages and applications.   Users must respect proprietary rights in compliance with the CERN Computing Rules (OC5). Not having legitimately obtained a program or the required licenses to run that software is not a minor offense. It violates CERN rules and puts the Organization at risk! Vendors deserve credit and compensation. Therefore, make sure that you have the right to use their software. In other words, you have bought the software via legitimate channels and use a valid and honestly obtained license. This also applies to “Shareware” and software under open licenses, which might also come with a cost. Usually, only “Freeware” is complete...

  10. Effectiveness of Oregon's teen licensing program : final report.

    Science.gov (United States)

    2008-06-01

    Significant changes in Oregons teen licensing laws went into effect on March 1, 2000. The new laws expanded the provisional driving license program which had been in effect since October 1989 and established a graduated driver licensing (GDL) prog...

  11. Assessment of the licensing aspects of HTGR in Yugoslavia

    International Nuclear Information System (INIS)

    Varazdinec, Z.

    1990-01-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  12. Assessment of the licensing aspects of HTGR in Yugoslavia

    Energy Technology Data Exchange (ETDEWEB)

    Varazdinec, Z [Institut za Elektroprivredu-Zagreb, Zagreb (Yugoslavia)

    1990-07-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  13. 10 CFR 34.13 - Specific license for industrial radiography.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Specific license for industrial radiography. 34.13 Section 34.13 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY... industrial radiography. An application for a specific license for the use of licensed material in industrial...

  14. An ontology based trust verification of software license agreement

    Science.gov (United States)

    Lu, Wenhuan; Li, Xiaoqing; Gan, Zengqin; Wei, Jianguo

    2017-08-01

    When we install software or download software, there will show up so big mass document to state the rights and obligations, for which lots of person are not patient to read it or understand it. That would may make users feel distrust for the software. In this paper, we propose an ontology based verification for Software License Agreement. First of all, this work proposed an ontology model for domain of Software License Agreement. The domain ontology is constructed by proposed methodology according to copyright laws and 30 software license agreements. The License Ontology can act as a part of generalized copyright law knowledge model, and also can work as visualization of software licenses. Based on this proposed ontology, a software license oriented text summarization approach is proposed which performances showing that it can improve the accuracy of software licenses summarizing. Based on the summarization, the underline purpose of the software license can be explicitly explored for trust verification.

  15. 78 FR 4467 - UniStar Nuclear Energy, Combined License Application for Calvert Cliffs Power Plant, Unit 3...

    Science.gov (United States)

    2013-01-22

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 52-016; NRC-2008-0250] UniStar Nuclear Energy, Combined License Application for Calvert Cliffs Power Plant, Unit 3, Exemption 1.0 Background UniStar Nuclear Energy (UNE), on behalf of Calvert Cliffs Nuclear Project, LLC and UniStar Nuclear Operating Services...

  16. 77 FR 51751 - Assessment of Fees for Dairy Import Licenses for the 2013 Tariff-Rate Import Quota Year

    Science.gov (United States)

    2012-08-27

    ... Agriculture's costs of administering the licensing system under this regulation. The regulation at 7 CFR 6.33... system, and $125,280.00 represents other miscellaneous costs, including travel, postage, publications... DEPARTMENT OF AGRICULTURE Foreign Agricultural Service Assessment of Fees for Dairy Import...

  17. 15 CFR 740.10 - Servicing and replacement of parts and equipment (RPL).

    Science.gov (United States)

    2010-01-01

    ... REGULATIONS LICENSE EXCEPTIONS § 740.10 Servicing and replacement of parts and equipment (RPL). This License... replacement of equipment. (a) Parts—(1) Scope. The provisions of this paragraph (a) authorize the export and reexport of one-for-one replacement parts for previously exported equipment. (2) One-for-one replacement of...

  18. 48 CFR 252.227-7007 - License term-running royalty.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false License term-running... of Provisions And Clauses 252.227-7007 License term—running royalty. As prescribed at 227.7009-4(b), insert the following clause in patent releases, license agreements, and assignments: License Term—Running...

  19. 21 CFR 515.10 - Medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Medicated feed mill license applications. 515.10... (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.10 Medicated feed mill license applications. (a) Medicated feed mill license applications (Forms FDA 3448) may...

  20. License - AcEST | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us AcEST License to Use This Database Last updated : 2010/02/15 You may use this database in co...he Standard License specifies the license terms regarding the use of this database and the requirements you ...must follow in using this database. The Additional License specifies those items ... License The Standard License for this database is the license specified in the Creative Commons Attribution...-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database

  1. Status of safety issues at licensed power plants

    International Nuclear Information System (INIS)

    1991-03-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program has been established whereby an annual NUREG series report will be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirement areas. The data contained in this report are a product of the NRC's Safety Issues Management System database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by personnel in the NRC regions. This report has been prepared in order to provide a comprehensive description of the implementation and verification status of all the TMI Action Plan requirements at licensed reactors, and to make this information available to other interested parties, including the public. A corollary purpose of this report is for it to serve as a follow-on to NUREG-0933, ''A Prioritization of Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed facilities

  2. Cask development, testing, and licensing

    International Nuclear Information System (INIS)

    Quinn, G.J.; Haelsig, R.T.; Warrant, M.M.

    1986-01-01

    The NuPac 125-B Rail Cask was developed to provide a safe means of transporting the damaged core of Three Mile Island Unit 2 from the TMI site at Middletown, PA, to the Idaho National Engineering laboratory (INEL) at Idaho Falls, ID. The development of the NuPac 125-B Rail Cask posed two engineering and technical management challenges; Licensing Strategy - The NuPac 125-B Rail Cask represented the first irradiated fuel rail cask developed within the United States in the past decade, a decade characterized by changing nuclear regulations, and Accelerated Schedule - The TMI-2 defueling schedule demanded a cask development schedule one-third as long as normally required. These challenges governed the overall development and licensing process for the cask. First, a high degree of conservation was incorporated into the design to allow quick, simplified demonstrations of adequacy to regulatory staff. Second, redundant design techniques were employed in all areas of uncertainty. The testing program eliminated performance uncertainties and validated predictions and predictive models. Drop tests of a quarter-scale model of the cask were conducted, and results were correlated with analytic predictions to verify structural and mechanical performance of the cask. Full-scale tests of the canisters were conducted to verify structural behavior of canister internals which provide criticality control. This paper describes the testing program for the NuPac 125-B Rail Cask, presents results therefrom, and correlates findings with Regulation 10 CFR 71 of the U.S. Nuclear Regulatory Commission

  3. Traveler information services in rural tourism areas : appendix D, system/historical data analysis

    Science.gov (United States)

    2000-06-30

    This document presents information regarding data collection and dissemination functions for traveler information services in rural areas. It documents data collection functions and information dissemination functions, and provides an interpretive de...

  4. Mapping ecosystem service indicators in a Great Lakes estuarine Area of Concern

    Science.gov (United States)

    Estuaries provide multiple ecosystem services from which humans benefit. Currently, thirty-six Great Lakes estuaries in the United States and Canada are designated as Areas of Concern (AOCs) due to a legacy of chemical contamination, degraded habitat, and non-point-source polluti...

  5. Assessment of pharmacists’ delivery of public health services in rural and urban areas in Iowa and North Dakota

    Science.gov (United States)

    Scott, David M.; Strand, Mark; Undem, Teri; Anderson, Gabrielle; Clarens, Andrea; Liu, Xiyuan

    2016-01-01

    Background: The profession of pharmacy is expanding its involvement in public health, but few studies have examined pharmacists’ delivery of public health services. Objective: To assess Iowa and North Dakota pharmacists’ practices, frequency of public health service delivery, level of involvement in achieving the essential services of public health, and barriers to expansion of public health services in rural and urban areas. Methods: This study implemented an on-line survey sent to all pharmacists currently practicing pharmacy in Iowa and North Dakota. Results: Overall, 602 valid responses were analyzed, 297 in rural areas and 305 in urban areas. Three practice settings (chain stores [169, 28.2%], independent community pharmacies [162, 27.0%], and hospital pharmacies [156, 26.0%]) comprised 81.2% of the sample. Both chain and independent community pharmacists were more commonly located in rural areas than in urban areas (PDakota. These findings should be interpreted to be primarily due to differences in the role of the rural pharmacist and the quest for certain opportunities that rural pharmacists are seeking. PMID:28042356

  6. Correlations between radiological technology graduates academic achievement and their obtainment of a license

    International Nuclear Information System (INIS)

    Park, Myeong Hwan; Kwon, Deok Moon; Seo, Soo Kyo

    2006-01-01

    The study analyzed the correlations between variables like characteristics related to admission, academic achievement, obtainment of a radiological technology license. A majority of participants were from Daegu and academic high schools. Many participants were accepted by general admission selection, and their reason to apply to Daegu Health College was high graduate employment. Their selection for the academic program was made by their parents and themselves. Those who took the same course twice held 35.1%, and those who got an academic warning took 8.5%. The degree of participants' academic achievement showed somewhat low, and they had difficulty in taking their major courses. The average grade for admission was lower in a following selection order: college graduates, general, special, and rural areas. The admission selections and taking science courses in high school showed little significant correlations with obtainment of a radiological technology license. However, the obtainment of the license had significant correlations with retaking the same course, getting an academic warning, and the degree of academic achievement. The results also revealed that the obtainment of the license had little significant correlations with a part-time job experience, having a boy/girlfriend, and student club participation, but it had significant correlations with accommodations and study club participation. In conclusion, it is important to point out that radiological technology graduates' obtainment of a license is closely related with the degree of their academic achievement and their college life

  7. 10 CFR 71.5 - Transportation of licensed material.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Transportation of licensed material. 71.5 Section 71.5 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PACKAGING AND TRANSPORTATION OF RADIOACTIVE MATERIAL General Provisions § 71.5 Transportation of licensed material. (a) Each licensee who transports licensed...

  8. Administrative Strategies of School Management Effectiveness, Buriram Office of Primary Educational Service Area 4

    Directory of Open Access Journals (Sweden)

    Khanintipparat Prommaraj

    2017-09-01

    Full Text Available The objectives of this research were 1 to study the current and the expected Conditions of school management effectiveness, Buriram Office of Primary Educational Service Area 4 and 2 to construct administrative strategies of such schools. Eighty of directors, board chairpersons, teachers and parents were sampled. The instruments for data collection were 5-level rating scale questionnaires with the IOC value between 0.60–1.00 and the reliability value of 0.88 and in-depth interview forms. Quantitative data were analyzed by computer and qualitative data were inductively analyzed. The findings were as follows: 1. The current conditions school management effectiveness, Buriram Office of Primary Educational Service Area 4 was moderate while the expected conditions was high. By means of expected condition can be listed from high to low were atmosphere and environment management, administration, learning management and participation. 2. Strategies for effective management of schools under the Office of Educational Service Area 4 consists of four elementary Bachelor’s strategy is the first strategic development, management efficiency. 2 learners develop strategies to meet educational standards. Strategy 3: create an atmosphere and environment conducive to development. Strategy 4 and the joint cooperation of network.

  9. Introduction to Technology Export License of Nuclear Facility

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Hana; Lee, Chansuh; Shin, Donghoon [Korea Institute of Nuclear Nonproliferation and Control, Daejeon (Korea, Republic of)

    2014-05-15

    In this regime, the Nuclear Safety and Security Commission (NSSC) has authority on final decision making. And the Korea Institute of Nuclear nonproliferation and Control (KINAC) has missions to review the classification and export licensing technically. In principle, classification and export licensing are applied and reviewed individually. However, the number of application for classification and licensing has increased geometrically in the last three years. This is largely a due to the contract that the Republic of Korea (ROK) has finalized to build the UAE Barakah Nuclear Power Plant (BNPP) and Jordan Research and Training Reactor (JRTR). This circumstance brought an administrative burden for the government and related institutes as well as stakeholders. This article introduces the law related to the 'Technology Export License of Nuclear Facility' which was developed and legislated to improve the efficiency and effectiveness of commodities classification and export licensing. This system could significantly reduce the licensing burden for transferring the technologies. However, the classification and license on this system are still requested when transferring the goods. Therefore, KINAC will continue to figure out the needs for the stakeholders and keep searching for solutions to problems inherent in the industry.

  10. Introduction to Technology Export License of Nuclear Facility

    International Nuclear Information System (INIS)

    Seo, Hana; Lee, Chansuh; Shin, Donghoon

    2014-01-01

    In this regime, the Nuclear Safety and Security Commission (NSSC) has authority on final decision making. And the Korea Institute of Nuclear nonproliferation and Control (KINAC) has missions to review the classification and export licensing technically. In principle, classification and export licensing are applied and reviewed individually. However, the number of application for classification and licensing has increased geometrically in the last three years. This is largely a due to the contract that the Republic of Korea (ROK) has finalized to build the UAE Barakah Nuclear Power Plant (BNPP) and Jordan Research and Training Reactor (JRTR). This circumstance brought an administrative burden for the government and related institutes as well as stakeholders. This article introduces the law related to the 'Technology Export License of Nuclear Facility' which was developed and legislated to improve the efficiency and effectiveness of commodities classification and export licensing. This system could significantly reduce the licensing burden for transferring the technologies. However, the classification and license on this system are still requested when transferring the goods. Therefore, KINAC will continue to figure out the needs for the stakeholders and keep searching for solutions to problems inherent in the industry

  11. Benchmark for license plate character segmentation

    Science.gov (United States)

    Gonçalves, Gabriel Resende; da Silva, Sirlene Pio Gomes; Menotti, David; Shwartz, William Robson

    2016-09-01

    Automatic license plate recognition (ALPR) has been the focus of many researches in the past years. In general, ALPR is divided into the following problems: detection of on-track vehicles, license plate detection, segmentation of license plate characters, and optical character recognition (OCR). Even though commercial solutions are available for controlled acquisition conditions, e.g., the entrance of a parking lot, ALPR is still an open problem when dealing with data acquired from uncontrolled environments, such as roads and highways when relying only on imaging sensors. Due to the multiple orientations and scales of the license plates captured by the camera, a very challenging task of the ALPR is the license plate character segmentation (LPCS) step, because its effectiveness is required to be (near) optimal to achieve a high recognition rate by the OCR. To tackle the LPCS problem, this work proposes a benchmark composed of a dataset designed to focus specifically on the character segmentation step of the ALPR within an evaluation protocol. Furthermore, we propose the Jaccard-centroid coefficient, an evaluation measure more suitable than the Jaccard coefficient regarding the location of the bounding box within the ground-truth annotation. The dataset is composed of 2000 Brazilian license plates consisting of 14000 alphanumeric symbols and their corresponding bounding box annotations. We also present a straightforward approach to perform LPCS efficiently. Finally, we provide an experimental evaluation for the dataset based on five LPCS approaches and demonstrate the importance of character segmentation for achieving an accurate OCR.

  12. The United States nuclear regulatory commission license renewal process

    International Nuclear Information System (INIS)

    Holian, B.E.

    2009-01-01

    The United States (U.S.) Nuclear Regulatory Commission (NRC) license renewal process establishes the technical and administrative requirements for the renewal of operating power plant licenses. Reactor ope-rating licenses were originally issued for 40 years and are allowed to be renewed. The review process for license renewal applications (L.R.A.) provides continued assurance that the level of safety provided by an applicant's current licensing basis is maintained for the period of extended operation. The license renewal review focuses on passive, long-lived structures and components of the plant that are subject to the effects of aging. The applicant must demonstrate that programs are in place to manage those aging effects. The review also verifies that analyses based on the current operating term have been evaluated and shown to be valid for the period of extended operation. The NRC has renewed the licenses for 52 reactors at 30 plant sites. Each applicant requested, and was granted, an extension of 20 years. Applications to renew the licenses of 20 additional reactors at 13 plant sites are under review. As license renewal is voluntary, the decision to seek license renewal and the timing of the application is made by the licensee. However, the NRC expects that, over time, essentially all U.S. operating reactors will request license renewal. In 2009, the U.S. has 4 plants that enter their 41. year of ope-ration. The U.S. Nuclear Industry has expressed interest in 'life beyond 60', that is, requesting approval of a second renewal period. U.S. regulations allow for subsequent license renewals. The NRC is working with the U.S. Department of Energy (DOE) on research related to light water reactor sustainability. (author)

  13. Licensing safety critical software

    International Nuclear Information System (INIS)

    Archinoff, G.H.; Brown, R.A.

    1990-01-01

    Licensing difficulties with the shutdown system software at the Darlington Nuclear Generating Station contributed to delays in starting up the station. Even though the station has now been given approval by the Atomic Energy Control Board (AECB) to operate, the software issue has not disappeared - Ontario Hydro has been instructed by the AECB to redesign the software. This article attempts to explain why software based shutdown systems were chosen for Darlington, why there was so much difficulty licensing them, and what the implications are for other safety related software based applications

  14. DOE Patents Available for Licensing

    International Nuclear Information System (INIS)

    Stuber, C.

    1981-01-01

    DOE Patents Available for Licensing (DOE PAL) provides abstracting and indexing coverage of the DOE patent literature, including patent applications, that concerns any apsect of energy production, conservation, and utilization. The citations are arranged by subject category. DOE is prepared to grant exclusive or nonexclusive, revocable licenses under DOE-owned US patents and patent applications in accordance with the provisions of 10CFR781

  15. 25 CFR 558.4 - Granting a gaming license.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Granting a gaming license. 558.4 Section 558.4 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR GAMING LICENSES AND BACKGROUND INVESTIGATIONS FOR KEY EMPLOYEES AND PRIMARY MANAGEMENT OFFICIALS GAMING LICENSES FOR KEY EMPLOYEES AND PRIMARY...

  16. 75 FR 72824 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-26

    ... & OFF License. Everglory Logistics, Inc. (NVO & OFF), 440 McClellan Highway, 105F2, East Boston, MA..., Application Type: New NVO & OFF License. Hawaii Intermodal Tank Transport, LLC (NVO & OFF), 2350 S. Dock... Tran, Manager, Application Type: New NVO & OFF License. ITL USA Inc. dba International Transport...

  17. 78 FR 20107 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2013-04-03

    ... to maintain a valid bond. License No.: 016816F. Name: Green Integrated Logistics, Inc. Address: 16210... bond. License No.: 017054NF. Name: Asian Logistics, Inc. Address: 2079 South Atlantic Blvd., Suite D.... License No.: 020715N. Name: HI Trading International Corp. dba HI Transport International dba Shine...

  18. 32 CFR 643.126 - Transportation licenses.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Transportation licenses. 643.126 Section 643.126... ESTATE Additional Authority of Commanders § 643.126 Transportation licenses. Installation commanders are... free competitive proposals of all available companies or individuals. (b) DD Form 694 (Transportation...

  19. A comparison of licensed and un-licensed artisanal and small-scale gold miners (ASGM) in terms of socio-demographics, work profiles, and injury rates.

    Science.gov (United States)

    Calys-Tagoe, Benedict N L; Clarke, Edith; Robins, Thomas; Basu, Niladri

    2017-11-06

    Artisanal and small-scale gold mining (ASGM) represents one of the most hazardous work environments. While formalization of this sector has been suggested (e.g., Minamata Convention) as a means to improve working conditions, we are unaware of empirical evidence that supports this notion. This study aimed to compare sociodemographic profiles, work profiles, and injury rates among miners working in licensed versus un-licensed ASGM sites. In the Tarkwa mining region of Ghana, 404 small-scale miners were recruited in 2014 and interviewed regarding their occupational injury experiences over the preceding 10 years. Workers were drawn from 9 mining sites, of which 5 were licensed and 4 were not licensed. Sociodemographic characteristics of miners from the two groups were relatively similar. Those currently working in an un-licensed mine have spent more time in the ASGM sector than those currently working in a licensed mine (94 vs. 70 months). Miners working in an un-licensed site tended to experience more injury episodes (e.g., 26% vs. 8% had 3 or more injury events) and not use personal protective equipment during the time of an injury (92% indicated to not using vs. 73%) when compared to miners working in a licensed site. A total of 121 injury episodes were recorded for 2245 person years of ASGM work. The injury rate for those working in un-licensed mines was 5.9 per 100 person years (59 injuries in 995 person years) versus 5.0 (62 injuries in 1250 person-years) in the licensed mines. When focusing on the male miners, there was a significant difference in injury rates between those working in a licensed mine (4.2 per 100 person years) versus an un-licensed mine (6.1 per 100 person years). These findings advance our understanding of injuries amongst ASGM workers, and help identify important differences in socio-demographics, work profiles, and injury rates between miners working in a licensed versus and un-licensed site. The findings suggest that certain working

  20. EPOS Seismology services and their users

    Science.gov (United States)

    Haslinger, Florian; Dupont, Aurelien; Michelini, Alberto; Rietbrock, Andreas; Sleeman, Reinoud; Wiemer, Stefan; Basili, Roberto; Bossu, Rémy; Cakti, Eser; Cotton, Fabrice; Crawford, Wayne; Crowley, Helen; Danciu, Laurentiu; Diaz, Jordi; Garth, Tom; Locati, Mario; Luzi, Lucia; Pitilakis, Kyriazis; Roumelioti, Zafeiria; Strollo, Angelo

    2017-04-01

    The construction of seismological community services for the European Plate Observing System Research Infrastructure (EPOS) is by now well under way. A significant number of services are already operational, largely based on those existing at established institutions or collaborations like ORFEUS, EMSC, AHEAD and EFEHR, and more are being added to be ready for internal validation by late 2017. In this presentation we focus on a number of issues related to the interaction of the community of users with the services provided by the seismological part of the EPOS research infrastructure. How users interact with a service (and how satisfied they are with this interaction) is viewed as one important component of the validation of a service within EPOS, and certainly is key to the uptake of a service and from that also it's attributed value. Within EPOS Seismology, the following aspects of user interaction have already surfaced: - user identification (and potential tracking) versus ease-of-access and openness Requesting users to identify themselves when accessing a service provides various advantages to providers and users (e.g. quantifying & qualifying the service use, customization of services and interfaces, handling access rights and quotas), but may impact the ease of access and also shy away users who don't wish to be identified for whatever reason. - service availability versus cost There is a clear and prominent connection between the availability of a service, both regarding uptime and capacity, and its operational cost (IT systems and personnel), and it is often not clear where to draw the line (and based on which considerations). In connection to that, how to best utilize third-party IT infrastructures (either commercial or public), and what the long-term cost implications of that might be, is equally open. - licensing and attribution The issue of intellectual property and associated licensing policies for data, products and services is only recently gaining

  1. 31 CFR 545.519 - Payments and transfers authorized for goods and services exported to the territory of Afghanistan...

    Science.gov (United States)

    2010-07-01

    ...) SANCTIONS REGULATIONS Licenses, Authorizations and Statements of Licensing Policy § 545.519 Payments and... Taliban prior to the effective date. (a) Specific licenses may be issued on a case-by-case basis to permit... for the benefit of a person with respect to goods, software, technology, or services exported prior to...

  2. Methodology to identify, review, and evaluate components for license renewal

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gregor, F.E.; Walker, R.S.

    1988-01-01

    A methodology has been developed to systematically identify, review, and evaluate plant equipment for license renewal. The method builds upon the existing licensing basis, operating history, and accepted deterministic and probabilistic techniques. Use of these approaches provides a focus for license renewal upon those safety-significant systems and components that are not routinely replaced, refurbished, or subject to detailed inspection as part of the plant's existing test, maintenance, and surveillance programs. Application of the method identified the PWR and BWR systems that should be subjected to detailed license renewal review. Detailed examination of two example systems demonstrates the approach. The review and evaluation of plant equipment for license renewal differ from the initial licensing of the plant. A substantial operating history has been established, the licensing basis has evolved from the original one, and plant equipment has been subject to periodic maintenance and surveillance throughout its life. In consideration of these differences, a basis for license renewal is needed. License renewal should be based upon continuation of the existing licensing basis and recognition of existing programs and operating history

  3. Nuclear relevant installations licensing methodology in the Argentine Republic

    International Nuclear Information System (INIS)

    Paganini, C.E.

    1986-01-01

    A review of the requeriments of the Nuclear Installations Advisory Committee on Licensing (CALIN) from the nuclear security point of view, is presented. The methodology applied by the CALIN for the licensing in the Argentine Republic is included as well as codes, standards of applications and the interaction between the licensing Authority and the Responsible Entity during the whole process. Finally, the Atucha II nuclear power plant's licensing, in construction at present, is explained and the standard, of the licensing schedule, is presented graphically. (author) [es

  4. Material control system design: Test Bed Nitrate Storage Area (TBNSA)

    International Nuclear Information System (INIS)

    Clark, G.A.; Da Roza, R.A.; Dunn, D.R.; Sacks, I.J.; Harrison, W.; Huebel, J.G.; Ross, W.N.; Salisbury, J.D.; Sanborn, R.H.; Weissenberger, S.

    1978-05-01

    This report provides an example of a hypothetical Special Nuclear Material (SNM) Safeguard Material Control and Accounting (MC and A) System which will be used as a subject for the demonstration of the Lawrence Livermore Laboratory MC and A System Evaluation Methodology in January 1978. This methodology is to become a tool in the NRC evaluation of license applicant submittals for Nuclear Fuel Cycle facilities. The starting point for this test bed design was the Allied-General Nuclear Services--Barnwell Nuclear Fuel Plant Reprocessing plant as described in the Final Safety Analysis Report (FSAR), of August 1975. The test bed design effort was limited to providing an SNM safeguard system for the plutonium nitrate storage area of this facility

  5. Gas Reactor International Cooperative Program. Interim report. Safety and licensing evaluaion of German Pebble Bed Reactor concepts

    International Nuclear Information System (INIS)

    1978-09-01

    The Pebble Bed Gas Cooled Reactor, as developed in the Federal Republic of Germany, was reviewed from a United States Safety and Licensing perspective. The primary concepts considered were the steam cycle electric generating pebble bed (HTR-K) and the process heat pebble bed (PNP), although generic consideration of the direct cycle gas turbine pebble bed (HHT) was included. The study examines potential U.S. licensing issues and offers some suggestions as to required development areas

  6. 76 FR 3635 - Ocean Transportation Intermediary License Revocation

    Science.gov (United States)

    2011-01-20

    ... to maintain a valid bond. License Number: 004094F. Name: All Transport, Inc. Address: 8369 NW. 66th.... License Number: 020410F. Name: MBA Logistics, LLC. Address: 11455 Narin Drive, Brighton, MI 48114. Date... valid bonds. License Number: 021204NF. Name: United Logistics Corp. Address: 3650 Mansell Road, Suite...

  7. 76 FR 22106 - Ocean Transportation Intermediary License Revocation

    Science.gov (United States)

    2011-04-20

    ...: Failed to maintain a valid bond. License Number: 018088N. Name: ILS-International Logistics Solutions... maintain a valid bond. License Number: 019369N. Name: Independent Transport Line, LLC dba ITL. Address... bond. License Number: 022322N. Name: O.T.S. Logistics, Inc. Address: 18726 South Western Avenue, Suite...

  8. License Compliance Issues For Biopharmaceuticals: Special Challenges For Negotiations Between Companies And Non-Profit Research Institutions

    Science.gov (United States)

    Ponzio, Todd A.; Feindt, Hans; Ferguson, Steven

    2011-01-01

    monitor the licensee’s diligence and progress; most exclusive licenses include a commercial development plan, with penalties, financial or even revocation of the license, if the plan is not followed, e.g., the license falls too far behind. This study examines whether developmental milestone schedules based on a small molecule drug development model are useful and realistic in setting expectations for biopharmaceutical product development. We reviewed the monitoring records of all exclusive Public Health Service (PHS) commercial development license agreements for small molecule drugs or therapeutics based on biotechnology (biopharmaceuticals) executed by the National Institutes of Health (NIH) Office of Technology Transfer (OTT) between 2003 and 2009. We found that most biopharmaceutical development license agreements required amending because developmental milestones in the negotiated schedule could not be met by the licensee. This was in stark contrast with license agreements for small molecule chemical compounds which rarely needed changes to their developmental milestone schedules. As commercial development licenses for biopharmaceuticals make up the vast majority of NIH’s exclusive license agreements, there is clearly a need to: 1) more closely examine how these benchmark schedules are formed, 2) try to understand the particular risk factors contributing to benchmark schedule non-compliance, and 3) devise alternatives to the current license benchmark schedule structural model. Schedules that properly weigh the most relevant risk factors such as technology classification (e.g., vaccine vs recombinant antibody vs gene therapy), likelihood of unforeseen regulatory issues, and company size/structure may help assure compliance with original license benchmark schedules. This understanding, coupled with a modified approach to the license negotiation process that makes use of a clear and comprehensive term sheet to minimize ambiguities should result in a more realistic

  9. License Compliance Issues For Biopharmaceuticals: Special Challenges For Negotiations Between Companies And Non-Profit Research Institutions.

    Science.gov (United States)

    Ponzio, Todd A; Feindt, Hans; Ferguson, Steven

    2011-09-01

    the licensee's diligence and progress; most exclusive licenses include a commercial development plan, with penalties, financial or even revocation of the license, if the plan is not followed, e.g., the license falls too far behind.This study examines whether developmental milestone schedules based on a small molecule drug development model are useful and realistic in setting expectations for biopharmaceutical product development. We reviewed the monitoring records of all exclusive Public Health Service (PHS) commercial development license agreements for small molecule drugs or therapeutics based on biotechnology (biopharmaceuticals) executed by the National Institutes of Health (NIH) Office of Technology Transfer (OTT) between 2003 and 2009. We found that most biopharmaceutical development license agreements required amending because developmental milestones in the negotiated schedule could not be met by the licensee. This was in stark contrast with license agreements for small molecule chemical compounds which rarely needed changes to their developmental milestone schedules. As commercial development licenses for biopharmaceuticals make up the vast majority of NIH's exclusive license agreements, there is clearly a need to: 1) more closely examine how these benchmark schedules are formed, 2) try to understand the particular risk factors contributing to benchmark schedule non-compliance, and 3) devise alternatives to the current license benchmark schedule structural model. Schedules that properly weigh the most relevant risk factors such as technology classification (e.g., vaccine vs recombinant antibody vs gene therapy), likelihood of unforeseen regulatory issues, and company size/structure may help assure compliance with original license benchmark schedules. This understanding, coupled with a modified approach to the license negotiation process that makes use of a clear and comprehensive term sheet to minimize ambiguities should result in a more realistic benchmark

  10. License - Open TG-GATEs | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Open TG-GATEs License License to Use This Database Last updated : 2012/05/24 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  11. U.S. regulatory requirements for nuclear plant license renewal: The B and W Owners Group License Renewal Program

    International Nuclear Information System (INIS)

    Staudinger, Deborah K.

    2004-01-01

    This paper discusses the current U.S. Regulatory Requirements for License Renewal and describes the Babcock and Wilcox Owners Group (B and WOG) Generic License Renewal Program (GLRP). The B and W owners, recognizing the need to obtain the maximum life for their nuclear generating units, embarked on a program to renew the licenses of the seven reactors in accordance with the requirements of the Atomic Energy Act of 1954 and further defined by Title 10 of the Code of Federal Regulation Part 54 (10 CFR 54). These reactors, owned by five separate utilities, are Pressurized Water Reactors (PWR) ranging in net rated capacity from approximately 800 to 900 MW. The plants, predominately constructed in the 70s, have USNRC Operating Licenses that expire between 2013 to 2017. (author)

  12. Optimal Licensing Strategy: Royalty or Fixed Fee?

    OpenAIRE

    Andrea Fosfuri; Esther Roca

    2004-01-01

    Licensing a cost-reducing innovation through a royalty has been shown to be superior to licensing by means of a fixed fee for an incumbent licensor. This note shows that this result relies crucially on the assumption that the incumbent licensor can sell its cost-reducing inno-vation to all industry players. If, for any reason, only some competitors could be reached through a licensing contract, then a fixed fee might be optimally chosen.

  13. Postulated licensing schedule for an independent spent-fuel-storage installation

    International Nuclear Information System (INIS)

    Ludwick, J.D.

    1982-11-01

    A review of licensing requirements, processes, and anticipated actions for independent spent fuel storage installations (ISFSIs) was conducted in order to develop an estimated schedule and sequence of events for licensing a new ISFSI. This estimate will be useful to potential ISFSI owners in planning for the licensing of their facilities. It is concluded that, although many uncertainties exist with respect to such things as legal appeals, about 29 months are estimated to elapse between license application and license issuance for an ISFSI. This estimate is in reasonable agreement with a previous time estimate for licensing an ISFSI, and, taking into account the special circumstances involved, with the actual licensing schedule for the GE-Morris ISFSI. However, individual portions of the licensing schedule from each case studied sometimes vary significantly

  14. License - TMFunction | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TMFunction License License to Use This Database Last updated : 2017/01/23 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...ion-Share Alike 4.0 International is found here . With regard to this database, you are licensed to: freely

  15. The case against a smoker's license.

    Directory of Open Access Journals (Sweden)

    Jeff Collin

    Full Text Available Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  16. The case for a smoker's license.

    Directory of Open Access Journals (Sweden)

    Simon Chapman

    Full Text Available BACKGROUND TO THE DEBATE: Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  17. The case for a smoker's license.

    Science.gov (United States)

    Chapman, Simon

    2012-01-01

    Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  18. The case against a smoker's license.

    Science.gov (United States)

    Collin, Jeff

    2012-01-01

    Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  19. Overview of Activities in U.S. Related to Continued Service of Nuclear Power Plant Concrete Structures

    International Nuclear Information System (INIS)

    Naus, Dan J.

    2011-01-01

    Safety-related nuclear power plant concrete structures are described and commentary on continued service assessments of these structures is provided. In-service inspection and testing requirements in the U.S. are summarized. The license renewal process in the U.S. is outlined and its current status noted. A summary of operating experience related to U.S. nuclear power plant concrete structures is presented. Several candidate areas are identified where additional research would be of benefit to aging management of NPP concrete structures. Finally current ORNL activities related to aging-management of concrete structures are outlined: development of operating experience database, application of structural reliability theory, and compilation of elevated temperature concrete material property data and information.

  20. House passes energy bill with one-step plant licensing

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The US House of Representatives which has traditionally been wary of measures that would allow nuclear power to expand, came down strongly on the side of nuclear when it approved a much-amended omnibus energy bill on May 27 by a vote of 381 to 37. The key for the nuclear industry is the presence in the bill (H.R. 776) of language on one-step power plant licensing that was taken directly from the Senate energy bill (S. 2166) that passed in February. This means that when the House and Senate work out a compromise version of the legislation, one-step licensing is almost certain to be carried through--and become law once the final bill is signed by President George Bush, which is expected later this year. The House's endorsement of nuclear power--both as it exists now, and as it could be with the introduction of new plant designs and an end to the long hiatus in plant orders by utilities--went beyond one-step licensing. Debate on the House floor prior to Memorial Day totally transformed the nuclear-related part of the energy bill. H.R. 776 was reported to the floor by the Rules Committee with language by the Interior and Insular Affairs Committee that would have created a nominal one-step system, with a full evidentiary hearing prior to plant construction but also allowing an intervenor who later presents new information on the plant to get another full evidentiary hearing after construction but before operation. This would effectively duplicate the two-step process that existed for all plants now in service, and which utilities no longer want to endure