WorldWideScience

Sample records for secondary part procureability

  1. Spare parts classification and procurement program

    International Nuclear Information System (INIS)

    Adlon, K.L.; Hassaballa, M.M.

    1986-01-01

    The cost benefits have been demonstrated for an integrated program, which is currently being implemented for two PWR stations with two 1100-MW units each. The component classification efforts reduced the number of safety-related components in several systems. Furthermore, the knowledge of the component specific function has contributed to the reduction of many safety-related parts per component, in addition to ensuring the procurement of parts to the correct safety level. The use of qualified commercial grade parts and components with their lower cost and reasonable procurement lead time compared to their 10 CFR 21 counterparts has a pronounced economic effect on the utility balance sheets

  2. Optimal repairable spare-parts procurement policy under total business volume discount environment

    International Nuclear Information System (INIS)

    Pascual, Rodrigo; Santelices, Gabriel; Lüer-Villagra, Armin; Vera, Jorge; Cawley, Alejandro Mac

    2017-01-01

    In asset intensive fields, where components are expensive and high system availability is required, spare parts procurement is often a critical issue. To gain competitiveness and market share is common for vendors to offer Total Business Volume Discounts (TBVD). Accordingly, companies must define the procurement and stocking policy of their spare parts in order to reduce procurement costs and increase asset availability. In response to those needs, this work presents an optimization model that maximizes the availability of the equipment under a TBVD environment, subject to a budget constraint. The model uses a single-echelon structure where parts can be repaired. It determines the optimal number of repairable spare parts to be stocked, giving emphasis on asset availability, procurement costs and service levels as the main decision criteria. A heuristic procedure that achieves high quality solutions in a fast and time-consistent way was implemented to improve the time required to obtain the model solution. Results show that using an optimal procurement policy of spare parts and accounting for TBVD produces better overall results and yields a better availability performance. - Highlights: • We propose a model for procurement of repairable components in single-echelon and business volume discount environments. • We used a mathematical model to develop a competitive heuristic that provides high quality solutions in very short times. • Our model places emphasis on using system availability, procurement costs and service levels as leading decision criteria. • The model can be used as an engine for a multi-criteria Decision Support System.

  3. Procurement and control of spare and replacement parts - a regulatory perspective

    International Nuclear Information System (INIS)

    Baker, E.T.; Grimes, B.K.; Merschoff, E.W.

    1987-01-01

    As the nuclear industry shifts from a construction to an operations orientation, a number of fundamental changes have occurred in the type of safety-related procurements and the manner in which the utilities accomplish these procurements. Specifically, procurements have shifted from the purchase of large systems and components by architect-engineers, and nuclear steam supply system (NSSS) suppliers to the procurement by utilities of subassemblies, individual pieces of equipment (e.g., breakers, relays), and small parts for repairing individual pieces of equipment. To ensure that equipment will continue to perform its intended function and to satisfy regulatory requirements utilities must consider several things: (1) does the equipment perform a safety function; (2) does the replacement part affect the safety function; and (3) does the replacement part affect the seismic or environmental qualification. If the answer to any of these questions is yes, the purchaser has two alternatives. He may procure the item as safety-related and require the supplier or manufacturer to comply with all the applicable technical and quality requirements or he may purchase the item commercial grade and perform the necessary inspections and tests to ensure the item meets the requirements, i.e., dedicate the item

  4. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    evolves from a simple establishment of a contractual relationship to a central and strategic part of construction. The authors relate to cultural, ethical and social and behavioural sciences as the fundamental basis for analysis and understanding of the complexity and dynamics of the procurement system......‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which...

  5. Infrastructure procurement skills gap amongst procurement personnel in Nigeria’s public sector

    OpenAIRE

    Mahamadu, A.-M. ed; Manu, P.; Booth, C.; Olomolaiye, P.; Coker, A.; Ibrahim, A. ed; Lamond, J.

    2018-01-01

    Purpose - Procurement of public infrastructure that is fit for purpose partly depends on the competencies of procurement personnel. In many developing countries in Sub-Saharan Africa, including Nigeria, there is a deficit in the quantity and quality of infrastructure and their procurement is further riddled with deficiencies in the capacity of public procuring entities. It is, however, unclear from the extant literature, what are the critical skills development needs of public personnel invol...

  6. PROCUREMENT INSOURCING VS. PROCUREMENT OUTSOURCING: EVIDENCE FROM SERBIA

    Directory of Open Access Journals (Sweden)

    Slobodan Acimovic

    2016-11-01

    Full Text Available One of the most important strategic decisions of a company is to choose whether to insource or outsource a particular group of activities or a business function. The trend of outsourcing those activities which do not form a part of the company core competences is becoming more and more present in business practice. The aim of the analysis within this paper is to review the mentioned trend from the position of organizing the company procurement activities. The analysis shows that there is no unique trend concerning outsourcing all logistics activities, which do not form a part of the company core competences. Unlike the majority of other logistics activities, which as non-basic, tend to be outsourced, procurement dominantly stays insourced. Finally, based on the empirical evidence obtained from a survey carried out among 52 companies in Serbia, it is concluded that even if procurement is outsourced, this trend is more present among service than production companies.

  7. Using TRIZ to Improve the Procurement Process of Spare Parts in the Taiwan Navy

    Directory of Open Access Journals (Sweden)

    Chia-Nan Wang

    2017-10-01

    Full Text Available Abstract: The Naval Maintenance and Repair Command Acquisition Management Unit (NMRC-AMU of the Taiwan Navy suffered from poor stock control of spare parts and inadequate modification of requested items and manufacturer/part codes during recent years. Therefore, the purpose of this study is to investigate core categorization, coordination, and procurement (CCP problems, to formulate feasible solutions and then to improve the CCP performances of spare parts in NMRC-AMU. The Teoriya Resheniya Izobreatatelskih Zadatch (TRIZ method was applied to solve this issue. A problem hierarchy analysis (PHA was first used to identify the core problems. Then, the 40 principles were used to determine the ideal improvement solution and formulate a solution strategy that simultaneously simplified CCP processed and enhanced the correctness of procurement tasks, thereby elevating CCP efficiency, supporting the Taiwan Navy repair missions, and satisfying fleet maintenance and servicing demands. The results indicated that total 6925 requests for coordination and procurement were submitted. Of these requests, 4366 requests had been completed (with total 102 cases, and the CCP efficiency is 63.0%. After improvement by this study, a total of 4529 items were submitted and 3592 executed items were completed (with a total of 172 cases, and the CCP efficiency is 79.3%. The improvement percentage of the CCP efficiency and completed cases are 30.6% and 68.6%, respectively. The performances are good and the TRIZ could be applied for other military forces.

  8. Technical Parts For Application E-Procurement in the Republic of Kosovo

    Directory of Open Access Journals (Sweden)

    Besnik HAJDARI

    2018-04-01

    Full Text Available Electronic procurement in the Republic of Kosovo has begun in 2012, had it not been for the accomplishment goals and development and implementation of electronic procurement in the Republic of Kosovo fully realized. e-Procurement is not only the publication of procurement results, but is a reflection of a defined legal process on procurement. The Internet are presented records of all claims, also via the Internet can be sent to all offers. Research: Through management system throughout the procurement process electronically will enable the preservation of technical and financial evaluation of bids. Thus, the presentation of this process in a transparent manner increases the reliability and efficiency. Method: Also through the management system of this process, according to the rights defined by law, each party can see the appeal process and remotely via the Internet. Implementation of e-procurement will enable the removal of barriers that were presented earlier, increasing the confidence of all parties involved. Access will be granted to all interested parties by allowing the approaches to the law, while in the case of restrictions should use electronic identification (e-ID. Result: The categorization of approaches will be for each separately, including contracting authority, contractors, bidders, complainers, the proxies of budgetary units, auditors and other categories defined under applicable laws. Security of information in e-procurement will be the maximum. As with any other service access to e-procurement will be provided through the state portal.

  9. Evolution in public procurement and the impact of e-procurement platforms: A case study

    OpenAIRE

    Leal, Pedro Manuel Mariano

    2010-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics The aim of this project is to understand the evolution that occurred in the public procurement due to the new Public Contracts Code that changed the procurement procedures and forced public entities to use electronic procurement platforms. This work is a contribution to the understanding of the main procurement changes with this ...

  10. Procurement engineering - the productivity factor

    Energy Technology Data Exchange (ETDEWEB)

    Bargerstock, S.B. (TENERA, L.P., Chattanooga, TN (United States))

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment. Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.

  11. Procurement engineering - the productivity factor

    International Nuclear Information System (INIS)

    Bargerstock, S.B.

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O ampersand M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment. Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O ampersand M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station

  12. 32 CFR 37.1330 - Procurement contract.

    Science.gov (United States)

    2010-07-01

    ... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1330 Procurement contract. A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 37.1330 Section 37.1330...

  13. 7 CFR 225.17 - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ...) Procurements by public sponsors comply with applicable State or local laws and the standards set forth in 7 CFR part 3016; and (2) Procurements by private nonprofit sponsors comply with standards set forth in 7 CFR... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement standards. 225.17 Section 225.17...

  14. 10 CFR 603.1300 - Procurement contract.

    Science.gov (United States)

    2010-01-01

    ... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...

  15. Critical elements of supplier development in the Malaysian automobile industry : Parts and components procurement and supplier development Practice at Proton【Article】

    OpenAIRE

    Abdullah, Rashid; Maharjan, Keshav Lall

    2003-01-01

    Supplier development is defined as any effort of a buying firm with regard to its supplier to increasethe performance and/or capabilities of the supplier to meet the buying firm's supply needs. The procure-ment practice of the buyer is critical and acts as a window to nurture the supplier development effort, itis also crucial in determining the type of relationship that the company has with its suppliers. This paperexamines the procurement practice at PROTON for parts and component inputs at ...

  16. Procurement management in scientific research and production project

    International Nuclear Information System (INIS)

    Wan Yi

    2008-01-01

    To meet the requirement of development trend of scientific research and production, it is necessary to incorporate the modern procurement management theory in the whole procurement process for the items used in scientific research and production.This paper provided some suggestions to improve the procurement management by introducing the experiences in the application of the modern procurement management methods in the procurement of parts production. (author)

  17. Public Procurement of Innovation in Sweden

    DEFF Research Database (Denmark)

    Rolfstam, Max; Ågren, Robert

    2014-01-01

    Sweden is often thought of as a country with a strong tradition for using public procurement as a means to stimulate innovation. Early on, Sweden recognized and developed procedures for using public procurement as a technologydevelopment tool. After a period where emphasis was put on this aspect ...... government authorities to engage in public procurement for innovation, and by issuing guidance on the topic.......Sweden is often thought of as a country with a strong tradition for using public procurement as a means to stimulate innovation. Early on, Sweden recognized and developed procedures for using public procurement as a technologydevelopment tool. After a period where emphasis was put on this aspect...... of public procurement Sweden dropped many policy initiatives within this field. This was in part due to neo-liberal movements during the 1980s which in interaction with a distributed institutional setup led to the removal of incentives for a procuring authority to engage in public procurement of innovation...

  18. 7 CFR 248.21 - Procurement and property management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management. 248.21 Section... Provisions § 248.21 Procurement and property management. (a) Requirements. State agencies shall comply with the requirements of 7 CFR part 3016 for procurement of supplies, equipment and other services with...

  19. Risk Management in Public Procurement Process

    Directory of Open Access Journals (Sweden)

    Ioana Manea

    2010-12-01

    Full Text Available Public procurement represents an important part of the current economy reality. Throughout the procurement process, due to the effect of the interaction among the components of the public procurement system, certain actions with significant negative effects on its optimal operation may occur. Risks may turn into certainty either because of a simple error in the development and administration of the procurement process, or because of a deliberate deviation from the existing legal provisions. Therefore, there is an imperative for the implementation of certain risk-avoiding measures, as well as of measures aiming to reduce their negative effects in case of their occurrence.

  20. 7 CFR 235.9 - Procurement and property management standards.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management standards. 235.9... Procurement and property management standards. (a) Requirements. State agencies shall comply with the requirements of 7 CFR part 3016 concerning the procurement of supplies, equipment and other services with State...

  1. Procurement Engineering Process for Commercial Grade Item Dedication

    International Nuclear Information System (INIS)

    Park, Jong-Hyuck; Park, Jong-Eun; Kwak, Tack-Hun; Yoo, Keun-Bae; Lee, Sang-Guk; Hong, Sung-Yull

    2006-01-01

    Procurement Engineering Process for commercial grade item dedication plays an increasingly important role in operation management of Korea Nuclear Power Plants. The purpose of the Procurement Engineering Process is the provision and assurance of a high quality and quantity of spare, replacement, retrofit and new parts and equipment while maximizing plant availability, minimizing downtime due to parts unavailability and providing reasonable overall program and inventory cost. In this paper, we will review the overview requirements, responsibilities and the process for demonstrating with reasonable assurance that a procured item for potential nuclear safety related services or other essential plant service is adequate with reasonable assurance for its application. This paper does not cover the details of technical evaluation, selecting critical characteristics, selecting acceptance methods, performing failure modes and effects analysis, performing source surveillance, performing quality surveys, performing special tests and inspections, and the other aspects of effective Procurement Engineering and Commercial Grade Item Dedication. The main contribution of this paper is to provide the provision of an overview of Procurement Engineering Process for commercial grade item

  2. Procurement of medical equipment in Sweden

    Directory of Open Access Journals (Sweden)

    Heikki Terio

    2010-02-01

    Full Text Available In many hospitals in Sweden the importance of technology management is already accepted and accepted since the hospital managements have recognised that technology is an integral part of all major policy and planning decisions. Today’s medical devices are technically complex and sometimes a system of interacting devices is required to achieve the desired clinical function. If the hospitals want to use the latest, modern technology, then they need to make substantial investments in both equipment and competence. Complex technology, large investments and need of highly qualii ed personnel to handle the medical devices are factors that indicate a need of well-dei ned procurement process as an essential part of the total health technology management system that should be used in a hospital. In such a procurement process, carefully prepared planning of technology investments can reduce the running costs and costs for maintenance substantially. In addition, a well-dei ned procurement process contributes to increase the patient safety. In Karolinska University Hospital goods and services are purchased for more than 20% of the hospital’s €1.2 billion turnover. It is therefore very important that the procurement is carried out ef ectively.

  3. Potential fraudulent behaviors in e-procurement implementation in Indonesia

    Science.gov (United States)

    Huda, S. N.; Setiani, N.; Pulungan, R.; Winarko, E.

    2017-03-01

    Corruptions in public procurement have occurred in various parts of the world, especially in developing countries. Implementation of SPSE (electronic procurement system) as the e-procurement system in Indonesia is based on the government’s intentions towards clean and good governance by fighting corruption, collusion, and nepotism. Procurement in Indonesia is carried out through SPSE, which is developed by LKPP (Government Policy on Procurement of Goods/Services). Although this system has brought many positive effects, there are still found many practices of fraud occurring in the implementation of the system. In this paper, we try to identify these practices and then to systematically categorize and analyze them.

  4. 76 FR 67370 - Federal Property Management Regulation (FPMR); Procurement Sources and Programs

    Science.gov (United States)

    2011-11-01

    ... to agency management and personnel. List of Subjects in 41 CFR Part 101-26 Procurement sources and... MANAGEMENT REGULATIONS PART 101-26--PROCUREMENT SOURCES AND PROGRAMS 0 1. The authority for 41 CFR part 101...; Docket Number 2011-017; Sequence 1] RIN 3090-AJ19 Federal Property Management Regulation (FPMR...

  5. 'Procurement quality engineering': A measurement driven system to assure quality at each step in the procurement process

    International Nuclear Information System (INIS)

    Rinderman, R.R.

    1993-01-01

    The 'Procurement Quality Function' is an element of the Body of Knowledge of Quality Engineering, as defined by the American Society for Quality Control (ASQC). This paper describes the Procurement Quality function which has been installed as an integral part of the Quality Engineering group of the Technical and Management Support Services (T ampersand MSS) contractor to the United States Department of Energy (DOE) Yucca Mountain Site Characterization Project. Each of the elements of the T ampersand MSS Procurement Quality Engineering (PQE) system is discussed along with the measurements obtained. With the installation and development of the PQE system we have attained more meaningful evaluation of supplier capability, reduction of procurement document review reject ratios from 31% to less than 2% per quarter, more effective measurement and control of supplier performance, and the ability to enter into a meaningful teaming effort with T ampersand MSS suppliers

  6. 76 FR 51916 - Procurement of Commodities and Services Financed by USAID

    Science.gov (United States)

    2011-08-19

    ... procurements with donated funds received under USAID's gift authority, Section 635(d), Foreign Assistance Act... AGENCY FOR INTERNATIONAL DEVELOPMENT 22 CFR Part 228 [Aid Reg. 228] RIN 0412-AA70 Procurement of... of 1961, as amended (FAA), be used for procurement in the United States (U.S.), the recipient country...

  7. Nuclear power equipment procurement management under EPC mode

    International Nuclear Information System (INIS)

    Shuai Yuezhi

    2014-01-01

    Nuclear power equipment procurement is one of the major constraints and management difficulties in the process of domestic nuclear power project construction for a long time. The construction of Hainan Changjiang Project can not meet the milestones due to the major equipment supply delay. Through the introduction to the organization and features of Changjiang project equipment procurement under EPC mode, and the main problems in the procurement process and its reason analysis, the purpose of this paper is to put forward ideas and suggestions of these items, i.e. selection of equipment suppliers, equipment localization, mass material design and procurement, complete system equipment supply, spare parts delivery and storage, owner process management, providing reference for follow-up projects. (author)

  8. Considerations regarding procurement activities in institutions of local authority

    OpenAIRE

    Mãdãlina ALBU

    2013-01-01

    Objectives which they propose a public authority requires, among others, providing the necessary resources, including the material occupy a large proportion. This is done through the public procurement system. The procurement is part of the legal and economic reality of the Romanian society and covers all rules and actions on public spending and the application launched by public bodies meets the proposed offer of an operator. This paper presents an analysis of the public procurement system i...

  9. Towards a successful centralization of municipal procurement: A case of KwaZulu-Natal province

    Directory of Open Access Journals (Sweden)

    Zwelihle Wiseman Nzuza

    2015-12-01

    Full Text Available Centralization of municipal procurement in the KwaZulu-Natal Province is faced with several challenges. There were two aims for this study: to identify factors influencing municipal procurement and to design a model of the factors influencing municipal procurement, in an attempt to improve the understanding of municipal procurement. The proposed model is based on sound theoretical frameworks like knowledge management theory and the application of theory and practice ethics as well as the secondary data. The study found that the biographic factors as well as internal and external factors have strong influences on the success or failure of municipal procurement. The significance of these factors formed the basis for a proposed model and is subject to further experiments by other scholars.

  10. ANALYSIS OF THE FOREIGN GOVERNMENT AND CORPORATE PROCUREMENT MANAGEMENT EXPERIENCE

    Directory of Open Access Journals (Sweden)

    Vladimir Vladimirovich Savchenko

    2016-01-01

    Full Text Available This article presents a synthesis of the experience of foreign government and corporate procurement management. Set out key aspects of the organization of procurement for government and corporate needs, disclosed issues of centralization and decentralization of procurement, as well as given clarifi cation of the concept of "procurement management system" and structured the main elements that make up this system. The purpose / goal. The purpose of the work is to study the nature and characteristics of the functioning of government and corporate experience in procurement management, identifying problems and prospects of its development. Methodology. To perform this work were used legal, comparative and statistical analysis methods. Results. As part of the presentation of the present article the author has examined the nature, objectives and stages of public and corporate procurement management.

  11. Small Business Set-asides in Procurement Auctions: An Empirical Analysis

    OpenAIRE

    Jun Nakabayashi

    2010-01-01

    As part of public procurement, many governments adopt small business programs to pro- vide contract opportunities for businesses often with preferences for firms operated by mem- bers of groups designated as disadvantaged. The redistribution arising from such programs, however, can introduce significant added costs to government procurement budgets. In this paper, the extent to which small business set-asides increase government procurement costs is examined. The estimates employ data on Japa...

  12. PROCUREMENT IN THE SUPPLY CHAIN: AN ELEMENT OF HOTEL PRODUCT COMPETITIVENESS

    Directory of Open Access Journals (Sweden)

    Edna Mrnjavac

    2016-12-01

    organization is essential for the application of the supply-chain principles, but it can also have the opposite effect. The principles of supply chain organization and management are present in all investigated hotels, but to varying degrees. While obtaining the lowest price is singled out as the primary goal of procurement, the need to take into account other elements, such as the quality of procurement, products and services, is also emphasized because this makes it possible to create a hotel product that guests will be satisfied with. Conclusion: The presence of supply-chain elements in hotel procurement correlates with the size of the hotel enterprise, but not with the type of hotel or its location (type of tourist destination. The organizational basis of stand-alone hotels is better suited for the development of supply chains. Their less-formal business organization and decentralized procurement provide a suitable environment for focusing on and effectively managing the business process to enhance product quality. In contrast, centralized procurement embedded in the more rigid organization of hotel enterprises contains a number of barriers that go against the supply chain concept. Partly for this reason, the primary goal of hotel enterprises is price, while quality is only a secondary goal. Networked supply-chain structures are present in both cases, and high on the list of procurement goals is the importance of building sound relationships with prominent suppliers. Also important is that procurement organized in this way focuses on the long term; the supplier market and procurement terms are analyzed periodically and, if necessary, changes are made regarding suppliers and supplier relationships.

  13. Factors influencing global antiretroviral procurement prices.

    Science.gov (United States)

    Wirtz, Veronika J; Forsythe, Steven; Valencia-Mendoza, Atanacio; Bautista-Arredondo, Sergio

    2009-11-18

    Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this.

  14. Public Procurement and the Development of the Swedish Telecommunications Market

    OpenAIRE

    Lindskog, Helena

    2008-01-01

    This thesis describes and analyses public procurement and its processes in general against the framework of industrial marketing and purchasing. In particular, it focuses on the public procurement of telecommunications (“telecom”) and its effects on the de-monopolization and development of the Swedish telecom market based on empirical material from three case studies, interviews and publicly available written sources. Public procurement is a significant part of any country’s economy. There is...

  15. The impact of e-Procurement practice in Indonesia government: A Preliminary Study (The case of Electronic Procurement Service at Bekasi District)

    Science.gov (United States)

    Candra, S.; E Gunawan, F.

    2017-01-01

    In digital economy, government of Indonesia uses the internet to deliver services and to communicate with citizens and organizations. One of applications are e-Procurement and LPSE is a unit to hold the service system of e-Procurement. Procurement of goods and services electronically in addition will increase transparency and accountability, improve market access and healthy competition, as well as improving the efficiency of the procurement process. Based on the background and specific objectives to be achieved, then the research will be viewed from e-Marketplace participation, Trust and its impact on the performance of existing procurement within the institution. Methods of data analysis used in this research is by using analysis of Structural Equation Modelling (SEM) by using the program Partial Least Square (PLS) to examine the relationship between variables. The population used in this study is an enterprise as well as other clients using the system LPSE Bekasi District. There are three part in this study population, namely the provision of a company, customer, and supplier of LPSE users amounted to 60 users. From data analysis, there are one hypothesis that rejected. The implication of this study are implementation of e-procurement and e-marketplace participation giving impact to procurement performance.

  16. Advancing Respect for Labour Rights Globally through Public Procurement

    Directory of Open Access Journals (Sweden)

    Olga Martin-Ortega

    2017-12-01

    Full Text Available Governments are mega-consumers of many manufactured products and services. As such they should in principle be able to influence workers’ rights abroad via the terms of purchase contracts. Yet to date little attention has been paid to the potential of public procurement to promote respect for labour rights globally besides the international trade law framework. Building on a limited emerging scholarship and policy developments, this article addresses this gap. Section 2 considers legal definitions of public procurement and distinguishes primary and secondary aims of procurement under key international and regional procurement regimes. This highlights that, although historically used to advance labour rights domestically, these regimes have restricted public buyers’ scope to advance labour rights beyond national borders. Section 3 explores new international policy frameworks on responsible global value chains and supply chains which by contrast appear to augur the greater use of public procurement to promote labour rights globally in future. Section 4 argues, supported by analysis of the limited examples available, that public buying has the potential to positively influence enjoyment of labour rights in practice. Concluding, Section 5 reflects on what the more specific impacts of public procurement in this context may be, and how public buying should complement other mechanisms for improving labour conditions across supply chains, such as social clauses in trade agreements. Finally, we outline issues for further research and the future policy agenda.

  17. Procuring load curtailment from local customers under uncertainty.

    Science.gov (United States)

    Mijatović, Aleksandar; Moriarty, John; Vogrinc, Jure

    2017-08-13

    Demand side response (DSR) provides a flexible approach to managing constrained power network assets. This is valuable if future asset utilization is uncertain. However there may be uncertainty over the process of procurement of DSR from customers. In this context we combine probabilistic modelling, simulation and optimization to identify economically optimal procurement policies from heterogeneous customers local to the asset, under chance constraints on the adequacy of the procured DSR. Mathematically this gives rise to a search over permutations, and we provide an illustrative example implementation and case study.This article is part of the themed issue 'Energy management: flexibility, risk and optimization'. © 2017 The Author(s).

  18. Computerized engineering logic for procurement and dedication processes

    International Nuclear Information System (INIS)

    Tulay, M.P.

    1996-01-01

    This paper summarizes the work performed for designing the system and especially for calculating on-line expected performance and gives some significant results. In an attempt to better meet the needs of operations and maintenance organizations, many nuclear utility procurement engineering groups have simplified their procedures, developed on-line tools for performing the specification of replacement items, and developed relational databases containing part-level information necessary to automate the procurement process. Although these improvements have helped to reduce the engineering necessary to properly specify and accept/dedicate items for nuclear safety-related applications, a number of utilities have recognized that additional long-term savings can be realized by integrating a computerized logic to assist technical procurement engineering personnel

  19. Organ procurement: Spanish transplant procurement management.

    Science.gov (United States)

    Manyalich, Martí; Mestres, Carlos A; Ballesté, Chloë; Páez, Gloria; Valero, Ricard; Gómez, María Paula

    2011-06-01

    Transplantation is an accepted therapeutic option to save or improve the quality of life when organ failure occurs or tissue replacements are needed. However, the lack of organs is the major limitation. The deceased organ procurement organization and professionals provide the solution to this international problem. In this review, we identify the elements involved in the organ procurement management process to analyze the possibility of implementation of deceased organ procurement for a transplantation program. While the donation rates are subject to several negative factors including religious, economic, cultural, and legal issues, the existence of well-trained professionals may considerably increase them. Professional training in organ donation along with the establishment of a solid organizational system has been identified as the crucial factor in developing efficient organ donation and transplantation programs.

  20. How is service procurement different from goods procurement? Exploring ex ante costs and ex post problems in IT procurement

    NARCIS (Netherlands)

    Wynstra, Finn; Rooks, Gerrit; Snijders, Chris

    2018-01-01

    Several studies suggest that, in practice, service procurement is more challenging than goods procurement. The underlying but largely implicit argument is that the procurement process for services involves higher buyer uncertainty and therefore requires extra efforts to mitigate this uncertainty.

  1. Indonesia - Country Procurement Assessment Report : Reforming the Public Procurement System

    OpenAIRE

    World Bank

    2001-01-01

    The main objectives of the Country Procurement Assessment Review (CPAR) are to diagnose the public procurement system in Indonesia, assess actual compliance with the country's procurement laws and regulations on the ground, and identify reforms to improve the existing system in line with internationally accepted principles. Section 1 gives an overview. Section 2 describes Indonesia's exist...

  2. An investigation into the effectiveness of public entities’ procurement practices

    Directory of Open Access Journals (Sweden)

    Moitswadi Mofokeng

    2014-11-01

    Full Text Available The delivery of services through the procurement of goods and services requires proper strategic leadership and management processes. Inappropriate planning, under-spending of budgets and ineffective procurement form part of the root causes of poor service delivery, as this restricts the movement of resources to the right places. This study identified the leading procurement practices as: procurement strategy and leadership, the procurement process, human resource management, procurement information systems, supplier management and procurement performance management. These practices were then tested in public entities, mainly in Gauteng Province, South Africa, to determine the extent to which they are applied. The study found that there is a major divide between the perception of the level of application of the leading practices and actual implementation. Processes, skills, performance management, information technology (IT systems and supplier management are applied inadequately or inappropriately. Most entities thus show a poor understanding of customer needs and there seems to be a general lack of customer focus. The study highlighted the best practice areas in which public entities are able to focus their efforts to better achieve excellent customer service and thus service delivery.

  3. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laiho, Aki; Laine, Jari

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, Procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... is presented and results of a first case study discussed. The findings highlight the importance of taking a contingency perspective on Procurement organization, understanding the internal and internal contingency factors. From a theoretical perspective, it opens up insights that can be furthermore leveraged...... in future studies in the fields of hybrid procurement organizations, global sourcing organizations as well as international procurement offices (IPOs). From a practical standpoint, an assessment of external and internal contingencies provides the opportunity to consciously match organization to its...

  4. Procurement in the Nuclear Industry, Quality, Safety and Decision Making

    International Nuclear Information System (INIS)

    Jakobsson, Marianne; Svenson, Ola; Salo, Ilkka

    2010-03-01

    The major purpose of the present study is partly to map and partly to make an analysis of the decision processes in the procurement routines in the nuclear industry in order to provide a basis for: 1. further development of safety inspections about procurements for Swedish Radiation Safety Authority 2. improvements of safety management in connection with procurement within a nuclear-power plant, 3 improvements of procurement routines in general in a nuclear power plant. The procurement processes at a nuclear power plant were analyzed from a decision theoretic perspective. Key staff at the plant was interviewed and written instructions as well as digitalized processes were used in the analysis. The results illustrate the most important moments during the procurement process with descriptions from interviews and documents. The staff at the nuclear power plant used a multi-attribute utility decision theory MAUT-inspired model in evaluation of alternatives and both compensatory (in which negative aspects can be compensated by positive aspects) and non-compensatory (in which certain 'pass' levels of attributes have to be exceeded for a choice) decision rules were used in the procurement process. Not surprising, nuclear safety was evaluated in a non-compensatory manner following regulatory criteria while costs were evaluated in trade-off compensatory rules, which means that a weakness in one consideration might be compensated by strength in another consideration. Thus, nuclear safety above the regulator's and law requirements are not integrated in a compensatory manner when procurement alternatives are evaluated. The nuclear plant assessed an organization's safety culture at an early stage of the purchasing process. A successful and a less successful procurement case were reported with the lessons learned from them. We find that the existing written instructions for purchase were well elaborated and adequate. There is a lack of personal resources when procurement teams

  5. 78 FR 40727 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-07-08

    ... for addition to the Procurement List for production by the nonprofit agencies listed: Products Towel.... 12/BX Cleaner, Brake Parts NSN: 6850-01-167-0678--17 oz. NPA: The Lighthouse for the Blind, St. Louis...

  6. The EU Public Procurement Regime. Does It Work?

    DEFF Research Database (Denmark)

    Hansen, Lars Gottlieb; Nielsen, Jørgen Ulff-Møller

    1999-01-01

    This article presents alternative theoretical approaches to analysing the EU liberalisation of the public procurement market and an empirical analysis based on the unit values, metric tons, and market shares of the intra-EU trade with 43 selected product groups in the combined nomenclature....... According to the analysis, it can not be ruled out that the liberalisation of the EU public procurement rules has manifested itself in parts of the market with the possibility that the effects will become increasingly evident in the longer term....

  7. How does procurement capability maturity affect e-Procurement adoption and leverage purchasing in supply chain

    Directory of Open Access Journals (Sweden)

    Pongpanga Pongsuwan

    2016-11-01

    Full Text Available This study refers to the research model of Batenburg (2008 which defined procurement functions to six maturity dimensions; strategy, processes, control, organization, information, e-Technology as the starting point and indicates twenty two items to support capability maturity measurement which is called “Procurement Competitive Capability Maturity”(PCCM. This model is used for a company to assess current practices of procurement function and perceives the level of its capabilities. The data collection is from a survey of fifty-two selected procurement organizations in Southeast Asia (SEA countries; from Thailand, Vietnam, Philippines, Indonesia, Malaysia and Singapore. The objective of this study is to demonstrate the significant value of industry type, size of spending and centralized/decentralized procurement that affect procurement capability maturity. The results show that the industry has no relation to the capability maturity; the size of procurement spend has a positive relation to the capability maturity; and the centralized procurement has higher capability maturity than the decentralized. Moreover, this study extends the knowledge of e-Procurement and digital context to leverage procurement processes and visible procurement integration in an organization and across the supply chain.

  8. Vaccine procurement and self-sufficiency in developing countries.

    Science.gov (United States)

    Woodle, D

    2000-06-01

    This paper discusses the movement toward self-sufficiency in vaccine supply in developing countries (and countries in transition to new economic and political systems) and explains special supply concerns about vaccine as a product class. It traces some history of donor support and programmes aimed at self-financing, then continues with a discussion about self-sufficiency in terms of institutional capacity building. A number of deficiencies commonly found in vaccine procurement and supply in low- and middle-income countries are characterized, and institutional strengthening with procurement technical assistance is described. The paper also provides information about a vaccine procurement manual being developed by the United States Agency for International Development (USAID) and the World Health Organization (WHO) for use in this environment. Two brief case studies are included to illustrate the spectrum of existing capabilities and different approaches to technical assistance aimed at developing or improving vaccine procurement capability. In conclusion, the paper discusses the special nature of vaccine and issues surrounding potential integration and decentralization of vaccine supply systems as part of health sector reform.

  9. Bulk material engineering and procurement management of NPS

    International Nuclear Information System (INIS)

    Fu Sanhong; Fan Kai

    2005-01-01

    In a nuclear power project, bulk material is often not in an outstanding position, compared to equipment, yet bulk material is one of most difficult part in engineering and procurement management. If the schedule is not in good control, it will seriously hamper the progress of the whole project. The article explores bulk material engineering and procurement management of NPS, illustrated with tables and graphs. First, major difficult aspects of bulk material procurement are described. On one hand, bulk material is really bulky in kind. We must have detail information of manufacturers, manufacture duration, and take good control of bidding schedule. On the other hand, when an order is placed, we need to make clear everything in the procurement package, such as material types, delivery batches, quantity of each batch and delivery schedule, which is a tremendous work. Then, a schedule conflict is analyzed: when an order is placed, the detail type and quantity cannot be defined (since the construction design is not finished yet). To settle this conflict, the concept 'Requirement Schedule Curve' is brought forward, along with the calculation method. To get this curve, we need to make use of the technical data of the reference power station, along with the site construction schedule, to produce a site quantity requirement curve varying from time, for each type of material. Last, based on the 'Requirement Schedule Curve', we are able to build a unified database to control the engineering, procurement, manufacturing and delivery schedule, so as to procure precisely, manufacture on time, and optimize the storage. In this way, the accurate control of bulk material engineering and procurement schedule can be achieved. (authors)

  10. 76 FR 14588 - Defense Federal Acquisition Regulation Supplement; Nonavailability Exception for Procurement of...

    Science.gov (United States)

    2011-03-17

    ... Federal Acquisition Regulation Supplement; Nonavailability Exception for Procurement of Hand or Measuring... Subjects in 48 CFR Part 225 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition... requirement at 10 U.S.C. 2533a (Berry Amendment) to acquire only domestic hand or measuring tools. DATES...

  11. Fighting corruption in tactical procurement

    NARCIS (Netherlands)

    Obanda Wanyama, Peter

    2010-01-01

    Vast amount of public resources are spent on procurement. Effective public procurement yields additional budget space, hence it ought to be conducted with due diligence. However, public procurement most especially tactical procurement in local governments in Uganda is vulnerable to corruption. In

  12. Public Procurement of Innovation Policy

    DEFF Research Database (Denmark)

    Rolfstam, Max; Petersen, Ole Helby

    2014-01-01

    Until recently, Danish policy interest in public procurement has mainly been driven by efficiency and cost-effectiveness concerns. Public-procurement policies have in general focused on the utilisation of economies of scale as a Means of achieving lower prices on goods and services. Attempts...... to develop mandatory procurement systems have also been gradually developing, while the focus on innovation has been relatively modest in Danish procurement policies until recently. This picture is currently changing, as several initiatives emphasising public procurement as a means of stimulating innovation...... have been launched. Whether this gradual change of focus in Danish procurement policies will make a deep and lasting impact on the role of public procurement as a driver for innovationis, however, yet an open question....

  13. Services procurement under the WTO’s agreement on government procurement: whither market access?

    OpenAIRE

    Shingal, Anirudh

    2010-01-01

    This paper studies the government procurement of services from foreign suppliers by conducting a statistical analysis of data submitted by Japan and Switzerland to the WTO's Committee on Government Procurement. Using several metrics, the paper examines if the WTO’s Agreement on Government Procurement (GPA) has led to greater market access for foreign suppliers in services procurement. Our results indicate that despite the GPA, the proportions of services contracts awarded to foreigners have d...

  14. Fighting corruption in tactical procurement

    OpenAIRE

    Obanda Wanyama, Peter

    2010-01-01

    Vast amount of public resources are spent on procurement. Effective public procurement yields additional budget space, hence it ought to be conducted with due diligence. However, public procurement most especially tactical procurement in local governments in Uganda is vulnerable to corruption. In this thesis we analyze how tactical procurement can be managed to fight corruption and promote integrity in the decentralized context in local governments in Uganda. Specifically, we identify the mos...

  15. Public procurement process

    African Journals Online (AJOL)

    NESG Policy Brief: April 2017. Public ... transparency in public procurement; and greater concerns about efficiency, fairness, and equity. ... government enacted the Public Procurement Act (2007) [1] which provides legislative framework for.

  16. Procurement Career Management Handbook.

    Science.gov (United States)

    Department of the Treasury, Washington, DC.

    This handbook is the result of the Treasury Department's efforts to increase professionalism among its procurement employees nationwide through its Procurement Career Management Program. First, the scope and objectives of the Procurement Career Management Program are discussed. The remaining sections of the handbook deal with the following program…

  17. Public Procurement and Innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    be understood as a special case of innovation, where social processes – and consequently the institutions governing these social processes – need to be considered. This book contributes to our understanding with a detailed institutional analysis of the public procurement of innovation.......Max Rolfstam examines the increasing emphasis on public procurement as a means to stimulate innovation and the theoretical implications of this policy development. While ‘regular’ public procurement may be regarded as the outcome of anonymous market processes, public procurement of innovation must...

  18. Monitoring What Governments “Give for” and “Spend on” Vaccine Procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline

    OpenAIRE

    Nelson, E. A. S.; Bloom, David E.; Mahoney, Richard T.

    2014-01-01

    BACKGROUND: The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of...

  19. Ukraine : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2001-01-01

    The main objectives of the country procurement assessment are to diagnose the public procurement system in Ukraine, assess compatibility of the country's laws, policies and procedures with international best practices, review compliance with the procurement laws and regulations and identify areas for improvement of the procurement system in Ukraine. With due recognition of the considerable...

  20. Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress

    Science.gov (United States)

    2016-07-25

    purposes of convenience. 2 For more on these three funding approaches, see CRS Report RL31404, Defense Procurement : Full Funding Policy— Background... procurement authorities. Section 1023 of H.R. 4909 as reported states (see part in bold): SEC. 1023. National Sea- Based Deterrence Fund. (a... procurement of critical contractor-furnished and Government-furnished components for national sea- based deterrence vessels. The authority under this

  1. Policy Brief: Engagement with Sustainability Concerns in Public Procurement in India: Why and How

    Energy Technology Data Exchange (ETDEWEB)

    Goswami, Anandajit; Diljun, Gaurang Meher; Scrivastava, Nidhi

    2013-08-15

    A major part of the Indian GDP is spent on public procurement. Owing to large spending on procurement, Indian public sector can push towards a process of sustainable production and consumption through sustainable public procurement. Once such a process is implemented with specific contexts, it can create social, economic and environmental benefits. With this background, the policy brief explores why there is a need to promote sustainable public procurement within India. Further, it highlights how such a procurement process can be implemented within India by drawing from international experiences. This policy brief charts out an action plan to implement the procurement process with an analysis of roles and responsibilities of different agencies involved in the implementation. While laying down this action plan, the brief also indicates about the existing status of sustainable public procurement in India. Therefore, this policy brief creates a way forward for public sector agencies, policy and decision makers to implement sustainable public procurement within India by understanding the current context of the issue within the nation and abroad.

  2. Sustainable Procurement in Practice: Explaining the Degree of Sustainable Procurement from an Organisational Perspective

    NARCIS (Netherlands)

    J. Grandia (Jolien); S.M. Groeneveld (Sandra); B.S. Kuipers (Ben); A.J. Steijn (Bram)

    2013-01-01

    textabstractSustainable procurement is often used to reduce negative environmental impacts related to production and consumption. Several studies in the sustainable procurement literature have identified potential drivers of and barriers to sustainable procurement, which are often organisational in

  3. Procurement of novel microanalysis equipment for construction materials.

    Science.gov (United States)

    2012-02-01

    The equipment procured (i.e. an Orbis micro X-ray Fluorescence (MXRF) and an APSEX personal Scanning Electron Microscope (PSEM)) is part of the next generation of micro analytical equipment. These tools have the ability to make large volumes of...

  4. Croatia : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2005-01-01

    Based on the CPAR's analysis of the legislative framework, procurement practices, institutional capacity and the opportunity for corruption, the assessment found that the environment for conducting public procurement in Croatia is average. This report makes a series of recommendations designed to strengthen the public procurement environment of Croatia, including legislative reform, improving procurement procedures and practices, institutional reform, capacity building, and the development of...

  5. Procurement of alcohol and underage drinking among adolescents in Ontario.

    Science.gov (United States)

    Smart, R G; Adlaf, E M; Walsh, G W

    1996-07-01

    The purpose of this article is to examine the procurement of alcohol among underage drinkers. The data are based on a survey of 3,571 students in Ontario schools. Underage drinkers were those younger than 19 years of age. Data were gathered with an anonymous questionnaire administered in classrooms in 1992. The data include descriptive analysis of underage procurement and a cluster analysis of underage drinker types (n = 1,125: 566 female). Most students found alcohol easy to obtain, with the most common access being from parents' supplies or older friends. Four types of underage drinkers were identified: bar drinkers (5%), frequent purchasers (10%), frequent obtainers (3%) and infrequent obtainers (83%). Frequent self purchasers and infrequent secondary purchasers have the highest levels of consumption and problems. However, most underage drinkers report no problems.

  6. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    Science.gov (United States)

    Nelson, E A S; Bloom, David E; Mahoney, Richard T

    2014-01-01

    The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. To determine realistic targets for VPA and VPB. Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs.

  7. Concern for older parts

    International Nuclear Information System (INIS)

    Titus, E.; Spink, T.; Cookson, B.; Tenera, L.P.

    1992-01-01

    For the last half decade, regulatory expectations of the procurement process for nuclear commercial-grade safety-related materials have increase. The changes have been driven by concern for fraudulent or misrepresented parts and the loss of original equipment manufacturers. The industry responded to these concerns by developing improved procurement programs that changed how parts were specified and received and provided for verification of attributes that were critical to the successful performance of safety functions(s). Like its counterparts, Duquesne Light Company (DLCo), Beaver Valley power station began applying these enhanced requirements to procurements initiated after January 1, 1990, in response to the Nuclear Management and Resources Council initiative on dedication. Procurements prior to this data were not subject to the new requirements

  8. Part-time post for qualified teacher of secondary Mathematics in English

    CERN Multimedia

    2011-01-01

    The English National Programme, which is part of the Lycee International de Ferney-Voltaire, is looking for an English mother-tongue teacher of secondary Mathematics, able to teach up to GCSE Statistics and Mathematics. This is a part-time post (4-6 contact hours per week) from September 2011. Please note that a relevant secondary Mathematics teaching qualification is required. For full details and information on how to apply, refer to the Programme's website. The page is: http://www.enpferney.org/enpv2/index.php?option=com_content&view=article&id=169:secondary-maths-posts&catid=21:staff-vacancies&Itemid=41 Enquiries to: Peter Woodburn, Head of Programme / hop@enpferney.org

  9. 40 CFR 35.6565 - Procurement methods.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  10. THE BARRIERS OF IMPLEMENTING E-PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Corina Pop Sitar

    2011-01-01

    Full Text Available The concept of e-procurement has many different meanings ranging from shopping on theinternet (through reverse auction to collaborative initiatives taking place in virtualmeetings. There are many forms of e-procurement that can be found in the literature. In thispaper we define the most important forms of e-procurement. Next, we present the mainbarriers of implementing an e-procurement found in the literature. Furthermore, we presenta matrix with the main barriers of e-procurement classified in four main categories. Finally,we elaborated for managers some guidelines in order to overcome the barriers ofimplementing e-procurement.

  11. The International Experience in Public Procurement

    Directory of Open Access Journals (Sweden)

    Pysmenna Mariia S.

    2017-11-01

    Full Text Available The article is aimed at generalizing the foreign experience of implementing public procurement, analyzing peculiarities of organizational, normative and procedural provision of public procurement in the Member States of the European Union. The relevance of the research topic is due to the need to harmonize the procurement policy of the Government of Ukraine with the international legal framework and with broad political objectives within the European integration strategy. The organizational framework and principles of implementing public procurement in the EU Member States were analyzed. Special attention was paid to normative provision of public procurement by the EU Member States; peculiarities of the use of national or harmonized rules of public procurement in accordance with the amount of the procurement contract; restrictions and conditions for public authorities in the selection of applicants for bidding. Five types of public procurement procedures used in the EU have been characterized, namely: open procedure, limited procedure, negotiation procedure, competitive dialog, electronic auctions. The need to address the social and legal aspects of public procurement in international practice has been substantiated and the possibilities for resolving these problems have been presented.

  12. PUBLIC PROCUREMENT IN GHANA: THE IMPLEMENTATION CHALLENGES TO THE PUBLIC PROCUREMENT LAW 2003 (ACT 663

    Directory of Open Access Journals (Sweden)

    Ameyaw, Collins

    2012-08-01

    Full Text Available The purpose of this study was to identify various implementation bottlenecks to the Ghana Public Procurement Law 2003 (Act 663. The study adopted multiple research approaches, including; review of relevant literature, interviews and questionnaire survey of 49 District Assemblies and Metropolitan and Municipal Assemblies in the Ashanti and Brong Ahafo Regions of Ghana. The study identified low capacity of procurement professionals, low interaction between procurement entities and Public Procurement Authority (PPA, deliberate controlling of competition, non-compliance with provisions of the law, splitting of contracts into smaller lots, lack of funds and non-cooperativeness of suppliers, as the major challenges militating against the implementation of the Public Procurement Law.

  13. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    Directory of Open Access Journals (Sweden)

    E A S Nelson

    Full Text Available BACKGROUND: The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA and Vaccine Procurement Baseline (VPB are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP that governments spend on their own vaccine procurement. OBJECTIVE: To determine realistic targets for VPA and VPB. METHODS: Organization for Economic Co-Operation and Development (OECD and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC countries disbursed (as % of GDP in current US$ for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. FINDINGS: In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013% and United Kingdom (0.0085% disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024% and Canada (0.008% made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. CONCLUSIONS: Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a vaccine procurement; and b immunization programs.

  14. Procurement Tracking System (PTS)

    Data.gov (United States)

    Office of Personnel Management — The Procurement Tracking System (PTS) is used solely by the procurement staff of the Office of the Inspector General (OIG) at the U.S. Office of Personnel Management...

  15. Brexit and government procurement

    OpenAIRE

    Dawar, Kamala

    2017-01-01

    This briefing paper looks at some of the legal issues that will affect the UK’s public procurement laws and policies following Brexit. For, once the UK revokes the European Communities Act 1972, it will no longer be obligated to follow the EU Procurement Directives, nor will it be subject to the commitments the EU has signed up to on behalf of the UK in the WTO Government Procurement Agreement (GPA) and in Preferential Trade Agreements (PTAs). Additionally, under the Devolution Settlement of ...

  16. The World Bank Group and Public Procurement--An Independent Evaluation : Volume 1. Building Procurement Capacity and Systems

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  17. Tanzania : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2003-01-01

    This Country Procurement Assessment Report (CPAR)intends to determine the compatibility of national procurement law, and practices, with the principles of economy, and with international procurement practices. This CPAR, the second of its kind in Tanzania, looks at the legislative framework, the performance of regulatory functions, the enforcement regime, and the capacity of public sector ...

  18. Industry activities to resolve utility procurement issues

    International Nuclear Information System (INIS)

    Rosch, F.

    1993-01-01

    There are several industry organizations which are active in assisting the utilities in their equipment procurement enhancement. They include the Nuclear Management Resources Council (NUMARC), the Electric Power Research Institute (EPRI), and the Nuclear Procurement Issues Committee (NUPIC). The products include the NUMARC Procurement Initiatives, EPRI procurement related guidelines and databases, and NUPIC joint audits and commercial grade surveys. The industry procurement activities and products are reviewed, and their use by utilities to enhance their procurement process is related. 1 fig

  19. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  20. Organ procurement in Israel: Lessons for South Africa

    Directory of Open Access Journals (Sweden)

    Bonnie Venter

    2015-11-01

    Full Text Available Modern medicine makes it possible to transplant not only kidneys but any solid organs from one human body to another. Although it is the ideal to harvest organs from a brain-dead person, a kidney or a part of the liver or lung can be transplanted from a living donor to a patient. The majority of countries where organ transplants are performed have a dire need for transplantable organs as the current systems of organ procurement are not obtaining a sufficient amount of transplantable organs. Today’s cruel reality is that many patients are dying while waiting for a transplant. Few nations are able to meet the organ demand through their domestic transplant systems and there is a constant debate about ethical ways of procuring organs for transplantation purposes. This article will scrutinise the Israeli system of organ procurement and it will be compared with the current system of organ donation in South Africa (SA in order to indicate whether SA could possibly, or should, follow the example of Israel to improve its acute donor organ shortage.

  1. Instructions included? Make safety training part of medical device procurement process.

    Science.gov (United States)

    Keller, James P

    2010-04-01

    Before hospitals embrace new technologies, it's important that medical personnel agree on how best to use them. Likewise, hospitals must provide the support to operate these sophisticated devices safely. With this in mind, it's wise for hospitals to include medical device training in the procurement process. Moreover, purchasing professionals can play a key role in helping to increase the amount of user training for medical devices and systems. What steps should you take to help ensure that new medical devices are implemented safely? Here are some tips.

  2. Discriminatory public procurement policies

    NARCIS (Netherlands)

    Ssennoga, Francis

    2010-01-01

    To achieve social economic objectives, governments usually institute discriminatory practices in their country’s public procurement framework. Discriminatory procurement is the practice by governments to favour their own domestic suppliers over foreign firms for advertised contracts. Favouring

  3. Slovakia : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2001-01-01

    This update of the 1995 CPAR is based on the September 1999 PPA and the findings of the Bank CPAR mission to Slovakia in November 1999. The 1999 Public Procurement Act (PPA) is an improvement upon the previous PPAs in some respects, including the creation of an OPP, more detailed and clear procurement procedures, accreditation of procurement professionals, introduction of the Public Procu...

  4. Performance-based procurement for low disturbance brdige construction projects

    NARCIS (Netherlands)

    Sebastian, R.; Claeson-Jonsson, C.; Di Giulio, R.

    2013-01-01

    Purpose – This paper aims to introduce a method of performance-based procurement, based on the most economically advantageous tender (MEAT), for low-disturbance bridge construction projects in urban environment. Design/methodology/approach – The first part of this paper reviews the key performance

  5. ONLINE PROCUREMENT IN SME`s

    Directory of Open Access Journals (Sweden)

    Daniela ICHIM

    2017-12-01

    Full Text Available E-Marketplaces are new business places for buying, selling products and services in many industries to support customers. The emergence of business-to-business (B2B in the online environment has opened up opportunities for effective online transactions between businesses. Research in this area is not enough to offer only fragmented perspectives in this area. Therefore, the targeted research problem was designed to investigate how business performance of online B2B purchases can be analyzed. The proposed study focuses on the online procurement in. Specifically, they try to answer questions such as: Does site, product, and vendor characteristics affect the online procurement in? Does online buying experience influence online procurement by? Participants are that use the Internet to procure products or services. Study respondents were SME managers who believe that online procurement will save time, money and effort, reducing costs.

  6. GSA On-Line Procurement Programs Lack Documentation and Reliability Testing

    National Research Council Canada - National Science Library

    Perry, Stephen

    2001-01-01

    .... For example, as part of an effort to improve the functioning of the government and achieve efficiencies of operations, the President has requested agencies to expand their use of on-line procurement in fiscal year 2OO2...

  7. Procurement with specialized firms

    NARCIS (Netherlands)

    Boone, Jan; Schottmuller, C.

    2016-01-01

    We analyze optimal procurement mechanisms when firms are specialized. The procurement agency has incomplete information concerning the firms' cost functions and values high quality as well as low price. Lower type firms are cheaper (more expensive) than higher type firms when providing low (high)

  8. Conflicts in Public Procurement

    Directory of Open Access Journals (Sweden)

    Helena Lindskog

    2013-01-01

    Full Text Available During the last couple of years, there has been a tendency to include more and more political goals into public procurements, such as environmental and societal considerations. This can result in higher prices paid by the public sector compared with similar procurements in the private sector. The decision makers at local level are elected and should represent the interest of their communities and voters, which includes promoting regional/local companies and economic development. This task can sometimes get into conflict with public procurement law or the political goals of a central government. (original abstract

  9. Public Procurement of Innovation as Endogenous

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Public procurement used as an innovation policy instrument has attracted attention the last decade. It has been argued that public procurement can be used to stimulate innovation from the demand-side. This paper problematizes ‘demand’ understood as a problem defined by a public procurer given...... to potential suppliers to solve. By drawing on a cross-case analysis of two similar projects the paper attempts to explicate an understanding of the role of public procurement of innovation not primarily as a ‘demand-side innovation instrument’, as such thinking might run the risk of ignoring important...... underlying mechanisms critical for success. Instead the paper views public procurement of innovation as an instrument of endogenous- exogenous knowledge conversion....

  10. 22 CFR 226.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement records. 226.46 Section 226.46 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.46 Procurement records...

  11. 10 CFR 21.31 - Procurement documents.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Procurement documents. 21.31 Section 21.31 Energy NUCLEAR REGULATORY COMMISSION REPORTING OF DEFECTS AND NONCOMPLIANCE Procurement Documents § 21.31 Procurement documents. Each individual, corporation, partnership, dedicating entity, or other entity subject to the...

  12. 10 CFR 436.43 - Procurement planning.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...

  13. 7 CFR 1780.72 - Procurement methods.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  14. Procurement with Specialized Firms

    NARCIS (Netherlands)

    Boone, J.; Schottmuller, C.

    2011-01-01

    This paper analyzes optimal procurement mechanisms in a setting where the procurement agency has incomplete information concerning the firms’ cost functions and cares about quality as well as price. Low type firms are cheaper than high type firms in providing low quality but more expensive when

  15. 76 FR 43988 - Procurement List; Additions

    Science.gov (United States)

    2011-07-22

    ... this work, based on applicable experience. Finally, the purpose of the JWOD Act and the responsibility... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...

  16. Monitoring What Governments “Give for” and “Spend on” Vaccine Procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline

    Science.gov (United States)

    Nelson, E. A. S.; Bloom, David E.; Mahoney, Richard T.

    2014-01-01

    Background The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments – both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. Objective To determine realistic targets for VPA and VPB. Methods Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. Findings In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Conclusions Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs. PMID:24586899

  17. Forward Commitment Procurement : A practical methodology that helps to manage risk in procuring innovative goods and services

    NARCIS (Netherlands)

    Whyles, G.; Meerveld, H. van; Nauta, N.J.

    2015-01-01

    The Forward Commitment Procurement (FCP) is a Public Procurement of Innovation (PPI) methodology. It was specifically designed to both provide a practical methodology for procurers to follow and to manage the perceived risk of the customer and supplier in innovation investments. The paper describes

  18. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    Development (OECD) sees public procurement ―as a strategic policy lever to advance ... financial markets and provision of advisory services to businesses and government. ... Procurement established by the Section 3 of the Act. The BPP is the ... present annual reports to the Minister on the public procurement processes;.

  19. CORRELATES OF PROCUREMENT PERFORMANCE OF ...

    African Journals Online (AJOL)

    Osondu

    2013-02-22

    Feb 22, 2013 ... Purpose of this study is to investigate if procurement challenges, contractual procedures, designer's experience ... Design and Build, Project Management, Direct. Labour and ..... Government Procurement Performance in.

  20. 78 FR 37525 - Procurement List; Deletions

    Science.gov (United States)

    2013-06-21

    .... Contracting Activity: Dept of the Air Force, FA7014 AFDW A7KI, Andrews AFB, MD. Service Type/Location: Laundry... Procurement List. SUMMARY: This action deletes products and services from the Procurement List that were... products and services listed below are no longer suitable for procurement by the Federal Government under...

  1. Energy Performance Indicators in the Swedish Building Procurement Process

    Directory of Open Access Journals (Sweden)

    Ingrid Allard

    2017-10-01

    Full Text Available In Sweden, all new buildings need to comply with the National Board of Housing, Building and Planning’s requirement on specific purchased energy (kWh/m2. Accordingly, this indicator is often used to set design criteria in the building procurement process. However, when energy use is measured in finished buildings, the measurements often deviate significantly from the design calculations. The measured specific purchased energy does not necessarily reflect the responsibility of the building contractor, as it is influenced by the building operation, user behavior and climate. Therefore, Swedish building practitioners may prefer other indicators for setting design criteria in the building procurement process. The aim of this study was twofold: (i to understand the Swedish building practitioners’ perspectives and opinions on seven building energy performance indicators (envelope air leakage, U-values for different building parts, average U-value, specific heat loss, heat loss coefficient, specific net energy, and specific purchased energy; and (ii to understand the consequences for the energy performance of multi-family buildings of using the studied indicators to set criteria in the procurement process. The study involved a Delphi approach and simulations of a multi-family case study building. The studied indicators were discussed in terms of how they may meet the needs of the building practitioners when used to set building energy performance criteria in the procurement process.

  2. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2011-01-01

    A major study of facilities management best practice covering 36 cases from the Nordic countries in Europe shows, that the most outstanding examples of innovation in FM are initiated from the demand side and involves new forms of procurement with long term contracts. This paper considers in depth......-called operational partnerships with private providers concerning all municipal buildings and sports facilities in parts of a city. Each of the case studies has involved both the client and the provider side of the collaboration. The cases show that an essential element in a successful procurement and partnership...... is that the client allows the providers freedom to plan their activities. Thereby the providers can optimize the use of their productive capacity and utilize their competences with incentives to profit from such improvements. A major challenge is to balance the risks between the client and provider and to create...

  3. The organization of organ procurement.

    Science.gov (United States)

    Prottas, J M

    1989-01-01

    The American organ procurement system has improved and matured in the last five years. At the same time, the basic challenges facing it have remained substantially the same because the moral and legal framework of the system has not changed. Success at organ procurement continues to depend on the voluntary cooperation of medical professionals and the families of potential organ donors. The generosity of the American public is so great that the primary challenge facing organ procurement agencies is obtaining cooperation from hospitals and medical professionals. This calls for a "marketing" orientation aimed at those hospitals and professionals who are most likely to treat potential donors. The last five years have seen a more general acceptance of this appreciation of the central task of organ procurement. As a result, the overall effectiveness of the system has improved, as measured by the number of organs procured on a per capita basis and by the number of multiorgan donors obtained. Much of this improvement can be attributed to the diffusion of organizational techniques and approaches, and this diffusion has been encouraged by the involvement of national organizations and public bodies in the organ procurement community. The system remains uneven in its effectiveness and further improvement is possible. It is also possible that the next general round of improvement will result from the application of businesslike information management and marketing techniques.

  4. 48 CFR 752.225-71 - Local procurement.

    Science.gov (United States)

    2010-10-01

    ... 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods... currency of the cooperating country. (b) All locally-financed procurements must be covered by source/origin...

  5. Quality assurance in the procurement of items and services for nuclear power plants

    International Nuclear Information System (INIS)

    1979-01-01

    This Safety Guide was prepared as part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to nuclear power plants. It supplements the Agency's Code of Practice on Quality Assurance for Safety in Nuclear Power Plants (Safety Series No.50-C-QA), which states requirements for the control of procurement of items and services which are important to the safety of nuclear power plants, for the purpose of achieving quality. The establishment and implementation of controls over the procurement process provide a basis for establishing an appropriate level of confidence that the activities undertaken during procurement of items and services have been performed in accordance with the principles of quality assurance expressed in the Code, and that the required quality of items and services has been achieved. The purchaser, in establishing control over procurement, shall ensure that the quality criteria, quality level, and other quality requirements specified for the particular item or service are taken into account

  6. One-on-one care management and procurement of Naloxone for ambulatory use.

    Science.gov (United States)

    Whittington, Richard; Whittington, Kathleen; Whittington, John; Porter, Joel; Zimmermann, Karla; Case, Holly; Berg, Stacey

    2018-02-16

    Morbidity and mortality from prescription opioids has reached unprecedented levels. Opioids remain part of chronic pain treatment in primary care. This study was designed to determine whether one-on-one care management increases procurement of Naloxone, an opioid antagonist shown to reduce morbidity and mortality in opioid overdoses. Participants included all patients ≥18 years enrolled in a primary care-based chronic pain management program and who were prescribed a daily dose of opioids for treatment of chronic pain. In total, 153 patients chose to participate. Each had a 1 h one-on-one education meeting with a registered nurse. Among the enrolled, eight patients (5.2%) had procured Naloxone prior to intervention. Overall, 31 additional patients (20.2%) procured Naloxone after intervention, a 288% relative improvement in the attainment of Naloxone (P procured Naloxone, 69.3% believed it was unnecessary, 20% forgot about Naloxone, 8% said it was cost prohibitive, 3.5% had access concerns and 0.9% had concerns about side effects. Direct one-on-one nurse care management sessions were associated with an increased procurement of Naloxone in a primary care-based pain management program. A significant number of patients believed Naloxone was unnecessary after the intervention.

  7. Multicriteria analysis in public procurement

    Directory of Open Access Journals (Sweden)

    Dejan T. Tošev

    2012-07-01

    Full Text Available The public procurement is one of the most important processes in modern company daily business. The quality of that process and its realization affect the overall company success and reputation. For that purpose, the management is obliged to prepare and carry out the procurement process carefully. The process is based on multicriteria tendering and the purpose of this paper is to present the analytical and hierarchical procurement methods in order to minimize failing in the selection and decision making process.

  8. Utilization of peat procurement network for purchase of energy wood. Subproject

    International Nuclear Information System (INIS)

    Kiukaanniemi, E.; Tervo, M.

    1998-01-01

    The objective of the project is to investigate and develop the energy wood procurement to the mire-terminals for production of mixed fuels, carried out by the peat contractors and forest machine entrepreneurs. The investigation of the costs of the chips produced for mixed fuels, the deviation of them and the possibilities to reduce them form the main part of the project. The duration of the project is two years, and it started in the summer 1997. Procurement of energy wood, carried out by forest machine and peat entrepreneurs, to the bog terminals for production of mixed fuels by the side of peat, will be studied in the project both experimentally and calculationally. The utilization of peat procurement network for energy wood procurement will mainly be studied. Costs and the harvesting logistics will be estimated using the software developed in the research. The project is divided into five sub-tasks: (1) survey on the contractor and machine needs of the experimental work; (2) selection of entrepreneurs and the harvesting sites; (3) practical harvesting experiments; (4) development of the cost calculation software; (5) analysis and reporting of the results

  9. Ethics and regulation in organ procurement research.

    Science.gov (United States)

    Ackerman, Terrence F; Winsett, Rebecca P

    2002-12-01

    This article explores the role of ethics and regulation in human research conducted by organ procurement agencies; basic ethical principles for human research are outlined. Organ procurement agencies are not required to observe federal regulations; however, voluntary adherence will ensure that procurement research is conducted according to current standards of ethical practice. Although most organ procurement research will qualify for exempt status, this determination should be made by an institutional review board. Even if studies qualify for exempt status, there is a moral presumption that informed consent should be sought, unless certain narrow conditions for waiver of consent are satisfied. Finally, when future research utilizing organ procurement records is anticipated, procurement coordinators should provide sufficiently detailed information to families about such plans to permit their advance informed consent to research activities.

  10. Economic analysis of the influence of milk market concentration on procurement efficiency in the defense system

    Directory of Open Access Journals (Sweden)

    Mihajlović Milan

    2016-01-01

    Full Text Available Increasing efficiency during realization of procurements in the defence system imposes the requirement to analyze the market, in order to detect all of its characteristics and to make conclusions which would benefit during planning of budgetary assets by one comprehensive process. Procuring milk and milk products represents a significant part of defence system's procurements which represents that a significant segment of the consumer standard of the Serbian Army, which implies the interest of authors to point to the significance of the concentration of the supply branch on the realization of procurements on the example of this market. The aim of this paper is to display the state and actual trends on the market of production and processing of milk, define methodological framework and point to the intensity and terms of competition and their influence on procurement criteria, especially price in the defence system of the Republic of Serbia.

  11. Challenges of public procurement in EU funded projects

    Directory of Open Access Journals (Sweden)

    Marko Šostar

    2017-01-01

    Full Text Available Membership in the European Union implies adjustment of EU projects to the rules of Structural Funds, but also adoption of legal regulations, thus influencing the process of implementation of the public procurement in EU funded projects. Each successful applicant who expressed the need for procurement of goods, services and works of a certain value, must respect the principles of public procurement. Irregularities in the procurement process can lead to the failure of returning the EU funds even several years after the end of the project. Therefore, the knowledge and proper implementation of public procurement is the main precondition for the correct implementation of each project. In order to obtain information about the current absorption capacity of the public procurement liable parties, and to identify key obstacles that stakeholders face in procurement procedures, the research was conducted by surveying 30 entities that are subject of public procurement in Croatia. Research results imply the poor quality of public procurement in the implemented projects, which often results in financial corrections, disapproving project reports, etc.

  12. The Work Sample Verification and the Calculation of the Statistical, Mathematical and Economical Probability for the Risks of the Direct Procurement

    Directory of Open Access Journals (Sweden)

    Lazăr Cristiana Daniela

    2017-01-01

    Full Text Available Each organization has among its multiple secondary endpoints subordinated to a centralobjective that one of avoiding the contingencies. The direct procurement is carried out on themarket in SEAP (Electronic System of Public Procurement, and a performing management in apublic institution has as sub-base and risk management. The risks may be investigated byeconometric simulation, which is calculated by the use of calculus of probability and the sample fordetermining the relevance of these probabilities.

  13. 75 FR 49481 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2010-08-13

    ... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...

  14. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laine, Jari; Mugurusi, Godfrey

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... and external contingency factors and having a more detailed look at the structural dimensions chosen, beyond the well-known characteristics of centralization, formalization, participation, specialization, standardization and size. From a theoretical perspective, it opens up insights that can be leveraged...

  15. What Is the Status of Indonesian E-Procurement?

    OpenAIRE

    Achmad Nurmandi

    2013-01-01

    E-procurement is an important intrument to prevent corruption in goods and services procurement budget. Indonesia has been implementing the e-procurement project since 2008 based on Presidential Decree. President has stipulating annual order (presidential instruction) has to be obey by all ministries and local governments to procure their budget through r-procurement mechanism. However, untill 2012 fiscal year, this research found that only around 10.26% of central government institution proc...

  16. 77 FR 33269 - Designation of Product Categories for Federal Procurement

    Science.gov (United States)

    2012-06-05

    ... procurement program (one part of the BioPreferred Program) is available on the Internet at http://www... program includes the following three statutory preference programs for designated products: the Bio... including the National Industries for the Blind (NIB) and NISH offer products and services for preferred...

  17. 78 FR 21916 - Procurement List; Addition And Deletions

    Science.gov (United States)

    2013-04-12

    ..., the following service is added to the Procurement List: Service Service Type/Location: Laundry Service...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  18. PROMIS (Procurement Management Information System)

    Science.gov (United States)

    1987-01-01

    The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

  19. Collaborative procurement for developing a sustainable campus

    Science.gov (United States)

    Nifa, Faizatul Akmar Abdul; Rahim, Syukran Abdul; Rani, Wan Nurul Mardiah Wan Mohd; Ismail, Mohd. Noorizhar

    2016-08-01

    It is particularly challenging to achieve sustainability in campus universities, where a high volume of users and activities has made it more imperative to promote green buildings that reduce energy and water consumption while having a minimal carbon footprint. At present, the frameworks for sustainable campus have seldom focused on the project procurement method which would improve construction team integration in developing the physical aspect of campus development. Therefore, in response to that challenge, this paper investigates how the delivery team, responsible for the design and construction of a project, can be integrated to work together more efficiently and more using the collaborative procurement method known as partnering. This paper reports part of a previous research and sets the base for ongoing research on the critical factors in partnering for sustainable campus development. The outcome or result of this study will meet and support the requirement for construction, maintenance, and operation process for universities towards sustainable building/campus in the future.

  20. Towards the procurement of the ITER divertor

    International Nuclear Information System (INIS)

    Merola, M.; Tivey, R.; Martin, A.; Pick, M.

    2006-01-01

    The procurement of the ITER divertor is planned to start in 2009. On the basis of the present common understanding of the sharing of the ITER components, the Japanese Participating Team (JAPT) will supply the outer vertical target, the Russian Federation (RF) PT the dome liner and will perform the high heat flux testing, the EU PT will supply the inner vertical targets and the cassette bodies, including final assembly of the divertor plasma-facing components (PFCs). The manufacturing of the PFCs of the ITER divertor represents a challenging endeavor due to the high technologies which are involved, and due to the unprecedented series production. To mitigate the associated risks, special arrangements need to be put in place prior to and during procurement to ensure quality and to keep to the time schedule. Before procurement can start, an ITER review of the qualification and production capability of each candidate PT is planned. Well in advance of the assumed start of the procurement, each PT which would like to contribute to the divertor PFC procurement, should first demonstrate its technical qualification to carry out the procurement with the required quality, and in an efficient and timely manner. Appropriate precautions, like subdivision of the procurement into stages, are also to be adopted during the procurement phase to mitigate the consequences of possible unexpected manufacturing problems. In preparation for writing the procurement specification for the vertical targets, the topic of setting acceptance criteria is also being addressed. This activity has the objective of defining workable acceptance criteria for the PFC armour joints. A complete set of analyses is also in progress to assess the latest design modifications against the design requirements. This task includes neutronic, shielding, thermo-mechanical and electromagnetic analyses. More than half of the ITER plasma parameters that must be measured and the related diagnostics are located in the

  1. Influence of control algorithms parameters on an electromechanical converter with a secondary discrete part

    Directory of Open Access Journals (Sweden)

    Kuimov Denis

    2017-01-01

    Full Text Available An alternative configuration of a device with a secondary discrete part using a magnetic system of a similar multi-phase inductor machine and concentrated windings without an internal rotor is proposed. An algorithm of sensorless control of a motion process of a secondary discrete part is proposed. The analysis of the distribution nature of the magnetic field for various switching algorithms is carried out to reduce negative influence of the “dead” zones of the first and second order. The features of the movement process of the secondary discrete part in the working chamber of the device are considered. The results of in the electromagnetic force change affecting a ferromagnetic working element are presented, and recommendations for the application of switching algorithms are given.

  2. Analysis of Critical Parts and Materials

    Science.gov (United States)

    1980-12-01

    1 1 1% 1% 1% 1% Large Orders Manual Ordering of Some Critical Parts Order Spares with Original Order Incentives Belter Capital Investment...demand 23 Large orders 24 Long lead procurement funding (including raw materials, facility funding) 25 Manpower analysis and training 26 Manual ... ordering of some critical parts 27 More active role in schedule negotiation 28 Multiple source procurements 29 Multi-year program funding 30 Order

  3. 76 FR 26279 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-05-06

    ...-service area; clean and sanitize food service equipment, utensil cleaning, and dishwashing; clean pots... additions to the Procurement List. SUMMARY: The Committee is proposing to add services to the Procurement... in this notice will be required to procure the services listed below from nonprofit agencies...

  4. The Institutionalised and Non-Institutionalised Exemptions from EU Public Procurement Law: Towards a More Coherent Approach?

    Directory of Open Access Journals (Sweden)

    Willem A. Janssen

    2014-12-01

    Full Text Available From a EU public procurement law perspective, contracting authorities have a discretionary power to decide upon who is allowed and best suited to provide public services to the public. When public authorities deem the in-house performance of a service to be the most suitable, the Court of Justice of the EU has allowed these authorities to rely on the institutionalised and non-institutionalised exemptions, which exempt a possible duty to contract out a public contract. The first part of this contribution discusses the recent codification of these exemptions in Article 12 Directive 2014/24/EU on public procurement. It concludes that this codification creates some legal certainty, but it mostly expands the scope of these exemptions from public procurement law. The second part of this contribution proposes a more coherent approach for these exemptions by discussing the challenges of regulating and enforcing the pre-procurement phase (the make-or-buy decision in which a public authority decides to favour the internal or external performance of a service. It concludes by providing legal perspectives to regulate and enforce this decision-making phase.

  5. Parts, Materials, and Processes Control Program for Expendable Launch Vehicles

    Science.gov (United States)

    2015-05-21

    cycle cost ; and 4. Improve procurement and test of small quantities of parts and materials that meet system requirements. This document supersedes...the reliability of program PMP to reduce PMP failures at all levels of assembly and test 3. Reduce program lifecycle cost 4. Improve procurement and...part shall be procured in single lots directly from the manufacturer or its authorized franchised distributor. The contractor shall be able to

  6. Transformation of fraud activities in procurement system in Indonesia

    Science.gov (United States)

    Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.

    2017-03-01

    E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.

  7. Procurement Options for New Renewable Electricity Supply

    Energy Technology Data Exchange (ETDEWEB)

    Kreycik, C. E.; Couture, T. D.; Cory, K. S.

    2011-12-01

    State renewable portfolio standard (RPS) policies require utilities and load-serving entities (LSEs) to procure renewable energy generation. Utility procurement options may be a function of state policy and regulatory preferences, and in some cases, may be dictated by legislative authority. Utilities and LSEs commonly use competitive solicitations or bilateral contracting to procure renewable energy supply to meet RPS mandates. However, policymakers and regulators in several states are beginning to explore the use of alternatives, namely feed-in tariffs (FITs) and auctions to procure renewable energy supply. This report evaluates four procurement strategies (competitive solicitations, bilateral contracting, FITs, and auctions) against four main criteria: (1) pricing; (2) complexity and efficiency of the procurement process; (3) impacts on developers access to markets; and (4) ability to complement utility decision-making processes. These criteria were chosen because they take into account the perspective of each group of stakeholders: ratepayers, regulators, utilities, investors, and developers.

  8. Mexico - The Federal Procurement System : Challenges and Opportunities

    OpenAIRE

    World Bank

    2007-01-01

    The World Bank carried out the first country procurement assessment review (CPAR) jointly with the Government in 2001, focusing on the features and performance of the federal procurement system. Based on the action plan included in the 2001 CPAR, the government reformed federal procurement laws and regulations in 2005 and furthered the development of Government Procurement Electronic Syste...

  9. Interactivity of marketing and procurement

    Directory of Open Access Journals (Sweden)

    Lazarević Dragan

    2007-01-01

    Full Text Available General conclusions regarding the close links between marketing and procurement side of the marketing process would be expressed as follows: Interactive link between marketing and procurement is just proportionate to a level of company's market orientation. Establishment of an interactive link between marketing and procurement fields would reflect on pricing. Besides price competition, establishment of an integral approach through comprehensive understanding of market relations, will set up conditions for company to meet customers' needs in the most optimal way. Therefore the total result will be advanced and a company with this kind of orientation can become a market leader.

  10. E-procurement and automatic identification: enhancing supply chain management in the healthcare industry.

    Science.gov (United States)

    Smith, Alan D; Flanegin, Frank R

    2004-01-01

    The concepts of automated e-procurement, or electronic B2B (business-to-business) trade, are grounded in the strategic leveraging of both tangible/intangible assets for successful implementation and execution of electronic trade, resulting in significant financial benefits for firms. Some of the major reasons for this growth include significant process savings from automation, compliance, and purchasing advantage; and reduced costs that organisations can experience by conducting transactions electronically. Although these are the basic benefits associated with generic e-commerce strategies, a majority of these B2B transactions have focused on the purchase of indirect materials (especially office products and travel services). In fact, more than 93% of medical supplies on hospital shelves appear to have universal product numbers on them--at least while still in their boxes and there is a great potential for huge savings in e-procurement in the healthcare field. However, other types of supply chain-related purchases, including maintenance, repair, and operating and replacement parts, and direct material purchases, are becoming more important operational management considerations. In addition, several other key considerations are: existing procurement strategy, the vendor, technology, suppliers, and total costs of ownership. Companies need to analyse their current procurement strategy before developing an e-procurement plan.

  11. Decentralized Procurement in Light of Strategic Inventories

    DEFF Research Database (Denmark)

    Frimor, Hans; Arya, Anil; Mittendorf, Brian

    2015-01-01

    The centralization versus decentralization choice is perhaps the quintessential organizational structure decision. In the operations realm, this choice is particularly critical when it comes to the procurement function. Why firms may opt to decentralize procurement has been often studied and conf......The centralization versus decentralization choice is perhaps the quintessential organizational structure decision. In the operations realm, this choice is particularly critical when it comes to the procurement function. Why firms may opt to decentralize procurement has been often studied...... and confirmed to be a multifaceted choice. This paper complements existing studies by detailing the trade-offs in the centralization versus decentralization decision in light of firm's decision to cede procurement choices to its individual devisions can help moderate inventory levels and provide a natural salve...

  12. The World Bank Group and Public Procurement--An Independent Evaluation : Volume 2: Achieving Development Effectiveness through Procurement in Bank Financial Assistance

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  13. Legal assistance on the application of public procurement rules in the waste sector

    DEFF Research Database (Denmark)

    Andrecka, Marta

    2016-01-01

    The report presents the results of a study investigating the application of public procurement rules in the municipal waste sector across the European Union conducted by Ramboll Management Consulting for the European Commission (DG GROW). The study is part of a process launched by the European...... Commission to analyse the application of public procurement rules in different market sectors. The scope of the study was set by the definition of municipal [solid] waste as presented in the Waste Framework Directive.1 The geographical scope of data collection was focused on seven Member States: Germany...

  14. 7 CFR 210.21 - Procurement.

    Science.gov (United States)

    2010-01-01

    ... Responsibilities § 210.21 Procurement. (a) General. State agencies and school food authorities shall comply with... violation of law are to be referred to the local, State, or Federal authority that has proper jurisdiction... title are followed. A school food authority may use its own procurement procedures which reflect...

  15. Measuring effects of public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Underway for quite some time now has been the discussion on using public procurement as a means to stimulate innovation. However - with some exceptions this has been mainly a conceptual discussion vastly surpassed a corresponding development of appropriate monitoring tools. Also, even if both...... qualitative and quantitative studies have been made, they tend to lack connection to the underlying mechanisms envisaged in the conceptual and/or case based literature. A challenge in this endeavour prevails in the nature of how public procurement of innovation works. Some of the effects rendered may...... about the usefulness of public procurement of innovation are at all realistic and feasible in practice. After reviewing different currently available means to measure both public procurement of innovation measures, as well as public procurement of innovation, the paper outlines a case-based approach...

  16. The Informing Needs of Procurement Officers in Israel

    Directory of Open Access Journals (Sweden)

    Yahel Giat

    2017-06-01

    Full Text Available Aim/Purpose: To develop and introduce a questionnaire that investigates the informing needs, information-seeking behavior, and supplier selection of procurement officers in Israel. The questionnaire’s internal consistency reliability is given. Additionally, we describe the demographic description of the procurement officers in Israel. Background: Procurement science is an important field that affects firms’ profits in the private sector and is significant to growth, innovation, sustainability, and welfare in the public sector. There is little research about the informing needs of procurement officers in general and particularly in Israel. Methodology: A quantitative questionnaire that is sent to all the procurement officers in Israel’s procuring association. Contribution: The questionnaire that is developed in this paper may be used by other researchers and practitioners to evaluate the information needs of procurement officers. Findings: The typical procurement officer is male, with a bachelor degree and is digitally proficient. Recommendations for Practitioners: The procuring side can use the questionnaire to develop better tools for obtaining information efficiently. The supplying side can use this knowledge to improve its exposure to potential customers and address its customer’s needs better. Recommendation for Researchers: The questionnaire can address theoretical questions such as how digital literacy affects the procuring process and provide empirical findings about active research areas such as supplier selection and information-seeking behavior. Future Research: Future research will examine the relationship between the various variables and demographic features to understand why specific information needs and information-seeking behaviors arise.

  17. Competition policy and public procurement in developing countries

    OpenAIRE

    Falvey, Rod; La Chimia, Annamaria; Morrissey, Oliver; Zgovu, Evious

    2008-01-01

    Measures to support Competition Policy and enhance the efficiency of Public Procurement can enhance the impact of regional integration agreements. The first part addresses Competition Policy - measures employed by government to ensure a fair competitive market environment. Competition policy aims to ensure that markets remain competitive (through anti-trust or anti-cartel enforcement) or become competitive (through liberalisation). For a variety of reasons, competition is often restricted in ...

  18. Public perspectives on biospecimen procurement: what biorepositories should consider.

    Science.gov (United States)

    L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M

    2013-06-01

    Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.

  19. EIA and green procurement: Opportunities for strengthening their coordination

    International Nuclear Information System (INIS)

    Uttam, Kedar; Faith-Ell, Charlotta; Balfors, Berit

    2012-01-01

    EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: ► This paper identifies opportunities to link EIA and green procurement. ► Pre-decision phase of EIA could be appropriate for planning green procurement. ► Future research should investigate the mechanism for establishing the link.

  20. EIA and green procurement: Opportunities for strengthening their coordination

    Energy Technology Data Exchange (ETDEWEB)

    Uttam, Kedar, E-mail: kedar@kth.se [Department of Land and Water Resources Engineering, Royal Institute of Technology, Stockholm (Sweden); Faith-Ell, Charlotta, E-mail: charlotta.faith-ell@WSPGroup.se [WSP Sweden (Sweden); Balfors, Berit, E-mail: balfors@kth.se [Department of Land and Water Resources Engineering, Royal Institute of Technology, Stockholm (Sweden)

    2012-02-15

    EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: Black-Right-Pointing-Pointer This paper identifies opportunities to link EIA and green procurement. Black-Right-Pointing-Pointer Pre-decision phase of EIA could be appropriate for planning green procurement. Black-Right-Pointing-Pointer Future research should investigate the mechanism for establishing the link.

  1. Tanzania : Country Procurement Assessment Report, Executive Summary

    OpenAIRE

    World Bank

    2004-01-01

    This Country Procurement Assessment Report (CPAR)intends to determine the compatibility of national procurement law, and practices, with the principles of economy, and with international procurement practices. This CPAR, the second of its kind in Tanzania, looks at the legislative framework, the performance of regulatory functions, the enforcement regime, and the capacity of public sector ...

  2. 22 CFR 201.23 - Procurement under private sector procedures.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...

  3. An evaluation of transit procurement training.

    Science.gov (United States)

    Noland, Robert B; Weiner, Marc D; Klein, Nicholas J; Puniello, Orin D

    2017-04-01

    We evaluated a training course called "Orientation to Transit Procurement", designed and conducted by the National Transit Institute. This course is designed to provide Federal Transit Administration (FTA) grantees an overview of regulations and best practices related to the procurement process. Our objective in conducting the evaluation was to understand how transit agency staff made changes in procurement practices in response to the course training. The evaluation was mixed mode: an Internet survey followed by in-depth interviews with a small group of respondents. Survey respondents were also provided with an open-ended question providing us with additional context for our evaluation. Results show that the training is substantially successful at meeting the goal of improving procurement practices at transit agencies; indeed, most respondents report making changes at their agencies as the proximate result of the training. This was at odds with our exploration of knowledge of procurement topics, as most respondents gave inaccurate answers on multiple-choice "knowledge questions". This may have been due to question structure or, more likely, the nature of online surveys. Suitable training on the procurement of information technology was also a main concern. The lack of training in this area is indicative of the broader challenge facing public transit agencies in how to incorporate new forms of technology into their existing practices and bureaucratic structures. Copyright © 2016 Elsevier Ltd. All rights reserved.

  4. The Malaysian Public Procurement's Prevalent System and its Weaknesses

    OpenAIRE

    Rohana Othman; Husein Zakaria; Norlaili Nordin; Zamzam Shahidan; Kamaruzaman Jusoff

    2010-01-01

    Problem statement: This study examined the public procurement system as prevalent in the Malaysian government system of administration. Various aspects of public procurement are outlined including types and the processes that entail public procurement. This study also highlighted the weaknesses in the manual public procurement processes that are opened to potential abuse and mismanagement resulting in corruption. This study places the Malaysian Government public procurement system under the s...

  5. Healthy food procurement and nutrition standards in public facilities: evidence synthesis and consensus policy recommendations

    Directory of Open Access Journals (Sweden)

    Kim D. Raine

    2018-01-01

    Full Text Available Introduction: Unhealthy foods are widely available in public settings across Canada, contributing to diet-related chronic diseases, such as obesity. This is a concern given that public facilities often provide a significant amount of food for consumption by vulnerable groups, including children and seniors. Healthy food procurement policies, which support procuring, distributing, selling, and/or serving healthier foods, have recently emerged as a promising strategy to counter this public health issue by increasing access to healthier foods. Although numerous Canadian health and scientific organizations have recommended such policies, they have not yet been broadly implemented in Canada. Methods: To inform further policy action on healthy food procurement in a Canadian context, we: (1 conducted an evidence synthesis to assess the impact of healthy food procurement policies on health outcomes and sales, intake, and availability of healthier food, and (2 hosted a consensus conference in September 2014. The consensus conference invited experts with public health/nutrition policy research expertise, as well as health services and food services practitioner experience, to review evidence, share experiences, and develop a consensus statement/recommendations on healthy food procurement in Canada. Results: Findings from the evidence synthesis and consensus recommendations for healthy food procurement in Canada are described. Specifically, we outline recommendations for governments, publicly funded institutions, decision-makers and professionals, citizens, and researchers. Conclusion: Implementation of healthy food procurement policies can increase Canadians’ access to healthier foods as part of a broader vision for food policy in Canada.

  6. Healthy food procurement and nutrition standards in public facilities: evidence synthesis and consensus policy recommendations

    Science.gov (United States)

    Kim D., Raine; Kayla, Atkey; Dana Lee, Dana Lee; Alexa R., Ferdinands; Dominique, Beaulieu; Susan, Buhler; Norm, Campbell; Brian, Cook; Mary, L’Abbé; Ashley, Lederer; David, Mowat; Joshna, Maharaj; Candace, Nykiforuk; Jacob, Shelley; Jacqueline, Street

    2018-01-01

    Abstract Introduction: Unhealthy foods are widely available in public settings across Canada, contributing to diet-related chronic diseases, such as obesity. This is a concern given that public facilities often provide a significant amount of food for consumption by vulnerable groups, including children and seniors. Healthy food procurement policies, which support procuring, distributing, selling, and/or serving healthier foods, have recently emerged as a promising strategy to counter this public health issue by increasing access to healthier foods. Although numerous Canadian health and scientific organizations have recommended such policies, they have not yet been broadly implemented in Canada. Methods: To inform further policy action on healthy food procurement in a Canadian context, we: (1) conducted an evidence synthesis to assess the impact of healthy food procurement policies on health outcomes and sales, intake, and availability of healthier food, and (2) hosted a consensus conference in September 2014. The consensus conference invited experts with public health/nutrition policy research expertise, as well as health services and food services practitioner experience, to review evidence, share experiences, and develop a consensus statement/recommendations on healthy food procurement in Canada. Results: Findings from the evidence synthesis and consensus recommendations for healthy food procurement in Canada are described. Specifically, we outline recommendations for governments, publicly funded institutions, decision-makers and professionals, citizens, and researchers. Conclusion: Implementation of healthy food procurement policies can increase Canadians’ access to healthier foods as part of a broader vision for food policy in Canada. PMID:29323862

  7. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  8. International public procurement: From scant facts to hard data

    OpenAIRE

    Cernat, Lucian; Kutlina-Dimitrova, Zornitsa

    2015-01-01

    Public procurement is a negotiating area gaining in importance at multilateral and bilateral level, as evidenced by a brief review of procurement provisions in existing trade agreements. The size of procurement spending stands in most developed economies at double-digit percentage points of GDP. However, despite the size and importance of these markets, the factual information available to trade negotiators remains scarce. Although public procurement patterns (e.g. size of procurement markets...

  9. Risk Factors Influencing Construction Procurement Performance in Nigeria

    Directory of Open Access Journals (Sweden)

    Alhassan Dahiru

    2015-08-01

    Full Text Available One of the challenges facing construction procurement performance is the failure to determine the risk related factors limiting its success. These risk factors can cause a significant increase in the procurement cost leading to an increase in the overall project cost. The purpose of this study is to identify and evaluate the risk factors influencing construction procurement performance with a view to achieve the overall project performance. The objectives are to establish a relative significance index score for the most important risk factors limiting the procurement performance of the projects. A self administered questionnaire was employed to the construction industry professionals for responses. A total of 78 questionnaires were distributed to these professionals (architects, quantity surveyors, engineers, and contractors but 62 were returned and analyzed using influential index and later ranked in order of importance. Results of the analysis indicate a disparity in terms of ranking of the factors influencing construction procurement performance. Corruption related risk, conflict of interest, ineffective project technical feasibility, and lack of commitment to transparency were found to be the most significant factors limiting construction procurement performance. Communication barriers and unconfidential tender evaluation process were found to be the low weighted risk factors. The findings can serve as a supportive mechanism for risks management in public construction procurement management. Therefore, construction procurement personnel at all levels of government may find this study relevant, while improving construction procurement performance in the country. It is recommended that construction procurement system should be focused on risks related to corruption, conflict of interest, and effective technical feasibility for improving the overall project performance.

  10. Postmortem sperm procurement: a legal perspective.

    Science.gov (United States)

    Kahan, S E; Seftel, A D; Resnick, M I

    1999-06-01

    Postmortem sperm procurement with subsequent artificial insemination has become a technically feasible method for posthumous conception. A variety of legal questions exist involving the rights and relationships of the deceased, his family and his issue. We addressed these questions and designed a workable protocol for postmortem sperm procurement. MEDLINE, WESTLAW and LEXIS medical literature, and case law searches were conducted. United States and international case law, United States (federal and state) statutes, Uniform Law Commissions Acts, and law review commentaries and articles were reviewed. While postmortem sperm procurement is being requested throughout the United States, no standard protocol or procedural guidelines have been established by federal or state statute. Furthermore, the courts have not yet addressed this specific scenario in reported case law. Statutes and case law do address related factual scenarios and issues, including property rights in human bodies, rules governing transplantation of human organs/body parts, rights of parties in in vivo sperm bank donations and responsibilities of parents to the conceptus of artificial insemination. A workable protocol can be established by analyzing case law and statutes addressing factually similar scenarios. Urologists must focus on the express intent of the decedent and limit any postmortem sperm retrieval to the specific requests made by the decedent. Decedent requests should be documented in writing. The decedent must be competent and of majority age. In the absence of decedent expressed affirmative directive calling for sperm retrieval, no other relative or guardian may authorize this retrieval. Issues regarding the legitimacy and inheritance rights of the conceptus will most consistently be addressed when explicitly provided for in the will of the decedent.

  11. Regional trade agreements & procurement rules : facilitators or hindrances?

    OpenAIRE

    ANDERSON, Robert D.; MÜLLER, Anna Caroline; PELLETIER, Philippe

    2015-01-01

    This Working Paper considers the significance of government procurement chapters in regional trade agreements (RTAs), both in their own right and vis-à-vis the WTO Agreement on Government Procurement (GPA). The paper finds, inter alia, that: (i) a strong complementarity exists between government procurement trade commitments and general goods and services trade commitments, making integration of procurement commitments in a more general system such as the WTO Agreements desirable; (ii) govern...

  12. Sustainable Bridge Infrastructure Procurement

    DEFF Research Database (Denmark)

    Safi, Mohammed; Du, Guangli; Simonsson, Peter

    2016-01-01

    The lack of a flexible but systematic approach for integrating lifecycle aspects into bridge investment decisions is a major obstacle hindering the procurement of sustainable bridge infrastructures. This paper addresses this obstacle by introducing a holistic approach that agencies could use...... to procure the most “sustainable” (lifecycle-efficient) bridge through a fair design-build (D-B) tendering process, considering all the main aspects: life-cycle cost (LCC), service life-span, aesthetic demands and environmental impacts (LCA)....

  13. Small Business Procurement Event

    Science.gov (United States)

    2014-08-13

    Small Business Procurement Event 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of the Navy,Office of Small Business Programs,720 Kennon...distribution unlimited 13. SUPPLEMENTARY NOTES NDIA 27th Navy Gold Coast Small Business Procurement Event, 12-13 Aug 2014, San Diego, CA. 14. ABSTRACT

  14. Project specific quality assurance plan for Project W-178, 219-S secondary containment

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design, procurement and construction of the 219-S Secondary Containment Upgrade. The reviews and verifications will be on activities associated with design, procurement, and construction of the Secondary Containment Upgrade which includes, but is not limited to demolition, removal, new tank installation, tank 103 isolation, tank cell refurbishment, electrical, instrumentation, piping/tubing including supports, pump and valves, and special coatings. The full project scope is defined in the project Functional Design Criteria (FDC), SD-W178-FDC-001, and all activities must be in compliance with this FDC and related design documentation

  15. Uzbekistan : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2003-01-01

    Uzbekistan inherited the Soviet system for the procurement of goods, works and services for State needs. This system was suitable for a command economy but lacks the essential elements of competitiveness, transparency and accountability, which are the hallmarks of a market-based approach to government contracting. This Country Procurement Assessment Report (CPAR) comes at a time when a num...

  16. Procurement in the Nuclear Industry, Quality, Safety and Decision Making; Upphandling inom kaernkraftsindustrin, kvalitet, saekerhet och beslutsfattande

    Energy Technology Data Exchange (ETDEWEB)

    Jakobsson, Marianne; Svenson, Ola; Salo, Ilkka (PSA Psykologi och beslutsfattande, Stockholm (Sweden))

    2010-03-15

    The major purpose of the present study is partly to map and partly to make an analysis of the decision processes in the procurement routines in the nuclear industry in order to provide a basis for: 1. further development of safety inspections about procurements for Swedish Radiation Safety Authority 2. improvements of safety management in connection with procurement within a nuclear-power plant, 3 improvements of procurement routines in general in a nuclear power plant. The procurement processes at a nuclear power plant were analyzed from a decision theoretic perspective. Key staff at the plant was interviewed and written instructions as well as digitalized processes were used in the analysis. The results illustrate the most important moments during the procurement process with descriptions from interviews and documents. The staff at the nuclear power plant used a multi-attribute utility decision theory MAUT-inspired model in evaluation of alternatives and both compensatory (in which negative aspects can be compensated by positive aspects) and non-compensatory (in which certain 'pass' levels of attributes have to be exceeded for a choice) decision rules were used in the procurement process. Not surprising, nuclear safety was evaluated in a non-compensatory manner following regulatory criteria while costs were evaluated in trade-off compensatory rules, which means that a weakness in one consideration might be compensated by strength in another consideration. Thus, nuclear safety above the regulator's and law requirements are not integrated in a compensatory manner when procurement alternatives are evaluated. The nuclear plant assessed an organization's safety culture at an early stage of the purchasing process. A successful and a less successful procurement case were reported with the lessons learned from them. We find that the existing written instructions for purchase were well elaborated and adequate. There is a lack of personal resources when

  17. 22 CFR 226.44 - Procurement procedures.

    Science.gov (United States)

    2010-04-01

    ... Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.44 Procurement procedures. (a... and assistance, as appropriate, of such organizations as the Small Business Administration and the...

  18. International Research Study of Public Procurement

    NARCIS (Netherlands)

    Telgen, Jan; Harland, C.; Callender, G.; Harland, C.; Nassimbeni, G.; Schneller, E.

    2012-01-01

    In this chapter we examine the specific issue of public procurement, its importance to local, regional, national, and international economies as evidenced in a unique international comparative research study – the International Research Study of Public Procurement (IRSPP). First the public

  19. Drug procurement and management.

    Science.gov (United States)

    Salhotra, V S

    2003-03-01

    A strong drug procurement and management system under the RNTCP is critical to programme success. Significant improvements in manufacturing, inspection, supply, storage and quality control practices and procedures have been achieved due to an intensive RNTCP network. Drugs used in RNTCP are rifampicin, isoniazid, ethambutol, pyrazinamide and streptomycin. Patients of TB are categorised into I, II and III and each category has a different standarised treatment. Procurement, distribution system and quality assurance of drugs are narrated in brief in this article.

  20. 40 CFR Appendix I to Subpart S of... - Vehicle Procurement Methodology

    Science.gov (United States)

    2010-07-01

    ... I to Subpart S of Part 86—Vehicle Procurement Methodology I. Test Sampling: The master owner list... randomized master owner list. The manufacturer or their representative shall perform the following steps: (a... order of their appearance on a randomized master owner list until the required number of vehicles are...

  1. 76 FR 78248 - Procurement List; Addition and Deletions

    Science.gov (United States)

    2011-12-16

    .... Service Type/Location: Laundry Service, Stratton Medical Center, 113 Holland Ave, Albany, NY. [[Page 78249...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  2. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  3. 32 CFR 22.205 - Distinguishing assistance from procurement.

    Science.gov (United States)

    2010-07-01

    ... procurement contract, is the appropriate instrument, based on the following: (a) Purpose. (1) The grants... purpose is acquisition, then the grants officer shall judge that a procurement contract is the appropriate... 32 National Defense 1 2010-07-01 2010-07-01 false Distinguishing assistance from procurement. 22...

  4. Networking for knowledge capacity building of procurement professionals in Ghana

    Directory of Open Access Journals (Sweden)

    Kissi Ernest

    2016-12-01

    Full Text Available The role of public procurement professionals in achieving value for money in public procurement activities is widely acknowledged around the globe. This has inspired the organisation of training programmes and workshops for procurement professionals, particularly those in developing countries in order to hone their knowledge and skills for proper management of government projects. This paper sought to explore the opportunities in networking for knowledge capacity building of procurement professionals in Ghana. The study adopted quantitative research methods for both data collection and analysis. The paper revealed that professional networking can offer procurement professionals the opportunity to acquire new knowledge from external professionals, know global trends about procurement practice, and obtain new information from other institutions about procurement. It is recommended that a platform that can support a network of procurement professionals in Ghana should be developed in order to ensure effective interaction and communication among procurement professionals for their capacity building.

  5. Procurement Service launches new eLearning module

    CERN Multimedia

    2015-01-01

    The Procurement Service has launched a training module covering “Procurement of supplies at CERN up to 200,000 CHF” in the form of an eLearning, accessible to all users involved in the procurement process. A long version (30 minutes) and a short version (10 minutes) are now available via this link.   The objectives of this eLearning module are as follows: To improve users' knowledge of the Procurement Rules to facilitate the successful completion of a DAI. This will ensure their DAI is processed as quickly as possible; To decrease the number of single tender requests and to avoid non compliant procurement practices such as the fragmentation of requirements into smaller orders. The eLearning module in its short version covers a range of topics, including the role of the technical officer, estimation of order amount (and the subsequent procedure to follow) and preparation and completion of the DAI form. The longer version also includes useful informati...

  6. Organ procurement after euthanasia: Belgian experience.

    Science.gov (United States)

    Ysebaert, D; Van Beeumen, G; De Greef, K; Squifflet, J P; Detry, O; De Roover, A; Delbouille, M-H; Van Donink, W; Roeyen, G; Chapelle, T; Bosmans, J-L; Van Raemdonck, D; Faymonville, M E; Laureys, S; Lamy, M; Cras, P

    2009-03-01

    Euthanasia was legalized in Belgium in 2002 for adults under strict conditions. The patient must be in a medically futile condition and of constant and unbearable physical or mental suffering that cannot be alleviated, resulting from a serious and incurable disorder caused by illness or accident. Between 2005 and 2007, 4 patients (3 in Antwerp and 1 in Liège) expressed their will for organ donation after their request for euthanasia was granted. Patients were aged 43 to 50 years and had a debilitating neurologic disease, either after severe cerebrovascular accident or primary progressive multiple sclerosis. Ethical boards requested complete written scenario with informed consent of donor and relatives, clear separation between euthanasia and organ procurement procedure, and all procedures to be performed by senior staff members and nursing staff on a voluntary basis. The euthanasia procedure was performed by three independent physicians in the operating room. After clinical diagnosis of cardiac death, organ procurement was performed by femoral vessel cannulation or quick laparotomy. In 2 patients, the liver, both kidneys, and pancreatic islets (one case) were procured and transplanted; in the other 2 patients, there was additional lung procurement and transplantation. Transplant centers were informed of the nature of the case and the elements of organ procurement. There was primary function of all organs. The involved physicians and transplant teams had the well-discussed opinion that this strong request for organ donation after euthanasia could not be waived. A clear separation between the euthanasia request, the euthanasia procedure, and the organ procurement procedure is necessary.

  7. 75 FR 22745 - Procurement List Additions

    Science.gov (United States)

    2010-04-30

    ... General Services Administration. Services Service Type/Location: Laundry Services, Alaska VA Healthcare... Procurement List. SUMMARY: This action adds to the Procurement List products and services to be furnished by... concerning capability of qualified nonprofit agencies to provide the products and services and impact of the...

  8. 77 FR 27736 - Procurement List Additions

    Science.gov (United States)

    2012-05-11

    ... Research Laboratory, Washington, DC. Service Type/Location: Laundry, Refurbishment, and Warehouse Services... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be... products and services and impact of the additions on the current or most recent contractors, the Committee...

  9. E-PROCUREMENT: IMPORTANCIA Y APLICACIÓN

    Directory of Open Access Journals (Sweden)

    Isabel Fernández Quesada

    2003-04-01

    Full Text Available En el trabajo se aborda uno de los aspectos externos del e-business: el e-procurement. Se valora la importancia de la utilización de la red en general y en la función logística y de compras, en particular. Partiendo de las actividades tradicionales de compras, se explicitan las ventajas que supone respecto a ellas el e-procurement y la importancia estratégica de su aplicación. Asimismo, se profundiza en el propio concepto de e-procurement y en su arquitectura desde el punto de vista de su implantación empresarial.

  10. IEA Task 24 Solar procurement 2000

    International Nuclear Information System (INIS)

    Ellehauge, K.; Oestergaard, I.; Gramkow, L.

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  11. Sustainable Procurement

    DEFF Research Database (Denmark)

    Telles, Pedro; Ølykke, Grith Skovgaard

    2017-01-01

    and within it how sustainable requirements have increased the level of compliance required, particularly regulatory compliance. Compliance was already present in previous EU public procurement frameworks, but its extent on Directive 2014/24/EU leads the authors to consider the current legal framework...

  12. THE EFFECTIVENESS OF BUDGET ALLOCATION IN PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Irina Yu. Fedorova

    2015-01-01

    Full Text Available This article deals with the problem of budget allocation in the state order inRussia. Assesses the effectiveness of the financial mechanism of the public procurement business entities, purchasing activities are regulated by Federal Law №44-FZ and №223-FZ. The dynamics of financing the procurement process and reveal its features by using the most common methods of procurement through competitive bidding and without bidding. Identifies the causes of inefficient spending budget as a result of the non-competitive procurement methods by certain categories of business entities. 

  13. Playing the game of public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Given the emergence and diffusion of policies aiming at promoting the utilisation of public procurement as an innovation policy instrument, it is remarkable that very little scholarly attention has been given to the teaching of public procurement of innovation. This paper sets out to contribute...... towards mending this gap, by discussing some considerations made in the context of the development and set up of a university course in public procurement of innovation. A major challenge for such an endeavour is how to bring the complexities of real-life public procurement into a university class...

  14. Innovation public procurement in Russia: problems of institutional arrangements

    Directory of Open Access Journals (Sweden)

    Korytcev Maxim, A.

    2015-12-01

    Full Text Available The paper explores the problems of public procurement in innovation sphere in Russia, its institutional organization. In international practice, some strategies of innovation stimulation (by public procurement are developing. There is necessity to use more elements of these strategies in Russian National Procurement System. The active National Public Procurement System has no enough effective methods and instruments for stimulating innovation development now.

  15. Indonesia - Procurement Modernization

    Data.gov (United States)

    Millennium Challenge Corporation — The evaluation seeks to establish evidence on the possible effects of an intervention designed to modernize public procurement: effects on cost savings, performance...

  16. Government Procurement Agreements and Telecommunications Business

    Directory of Open Access Journals (Sweden)

    Shin-Won Kang

    2001-12-01

    Full Text Available The opening of the telecommunications market is acceleration due to the world trends of deregulation and privatization under the WTO basic telecommunications agreements. Diversification of services and fast and efficient equipment procurement are becoming necessary conditions for the survival of telecommunications operators. However, the issue here is that telecommunications operators are still bound by the GPA (Government Procurement Agreement based on conditions of monopoly even though the procurement market in Korean is open substantially since 1997. Under such conditions, the continued application of the GPA on telecommunications operator who is highly competitive may result in a negative impact on the telecommunications business and quality of telecommunications service by undermining the autonomy of operator and decreasing operator’s procurement competitiveness. Therefore, this study examines the GPA and the issues raised by the agreement, and also attempts to suggest revisions or means of abrogating the unfair GPA with regards to the development and deregulation of the telecommunications business.

  17. NASA Procurement Career Development Program

    Science.gov (United States)

    1987-01-01

    The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.

  18. Data feature: Fuel procurement

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This document is a review of the effect of fuel costs on the procurement strategies of a utility and a conjecture that the same strategies may have an effect on the price of fuel. Factors affecting fuel costs are reviewed, and a number of procurement strategies taken to trim fuel costs are reviewed. The major trend is away from long-term enrichment contracts and into such strategies as: (1) Spot market purchases, (2) Inventory reduction, (3) Purchase of CIS material, and (4) Market-related contracts instead of base-escalated contracts

  19. Study on Comparative Efficiencies in Vaccine Procurement Mechanisms

    OpenAIRE

    Bumpas, Janet

    2008-01-01

    Vaccinations are amongst the most cost-effective public health interventions. Vaccine procurement is a complex issue that interweaves the domains of public health, commodity security, ethics, and procurement. Its cross-disciplinary nature means that neither a straightforward analysis stemming from just one discipline nor a cookie-cutter application of World Bank procurement principles of e...

  20. Factors influencing e-Procurement adoption in the Nigerian building industry

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2016-12-01

    Full Text Available Against the backdrop of increasing adoption of e-Procurement in supply chain management, there is a need for adequate knowledge of the factors that influence the decision by organizations in the building industry to use e-Procurement. This study aims to fill the knowledge gap through investigating the factors influencing e-Procurement adoption based on the data sourced in a questionnaire survey involving 213 organizations in the building industry. The survey was conducted between June and November 2015 in Nigeria. Descriptive statistics, factor and categorical regression analyses were used to analyze the data. The results show that the three most important factors influencing the adoption of e-Procurement amongst the participants, in order of importance, were: the benefits of e-Procurement in enhancing efficiency in project delivery; eliminating geographic barriers and effective communication among project team members. The 29 factors were investigated in seven different dimensions - the benefits of e-Procurement use; level of awareness on e-Procurement in construction; and the availability and cost of e-Procurement applications emerged as the three most significant predictors of e-Procurement adoption in the survey. The study concludes by identifying strategies that should be engaged in increasing the uptake and maximizing the benefits of e-Procurement in the Nigerian building industry.

  1. 76 FR 80345 - Procurement List; Additions

    Science.gov (United States)

    2011-12-23

    ... ARMY, W6QL ECC MIAMI DIV, MIAMI, FL. Service Type/Location: Industrial Laundry Service, Bureau of... Procurement List. SUMMARY: This action adds services to the Procurement List that will be provided by... concerning capability of qualified nonprofit agencies to provide the services and impact of the additions on...

  2. 75 FR 47550 - Procurement List; Additions

    Science.gov (United States)

    2010-08-06

    ...--Macintosh Apple NSN: MR 473--Fresh Linen NPA: Industries for the Blind, Inc., West Allis, WI Contracting... Service, 5777 S. Aviation Blvd., N. Charleston, SC NPA: Goodwill Industries of Lower South Carolina, Inc... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...

  3. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    (2003: 2), ―strong procurement management in the public sector is a tool for achieving political, economic and social goals‖. Thus .... professionalism in the public sector procurement system (Section 4, PPA, 2007). The functions and powers of the ..... K., Bose, N. and Haque, M.E. (2004). Public Expenditures, Bureaucratic.

  4. 78 FR 45183 - Procurement List Additions

    Science.gov (United States)

    2013-07-26

    ... Requirement as aggregated by the General Services Administration. NSN: 7920-00-NIB-0564--Towel, Cleaning, Non... Procurement List. SUMMARY: This action adds a products and services to the Procurement List that will be... presented to it concerning capability of qualified nonprofit agencies to provide the products and services...

  5. Nepal : Electronic Government Procurement Readiness Assessment and Roadmap

    OpenAIRE

    World Bank

    2007-01-01

    The assessment focused on the degree of readiness of Government of Nepal's (GoN's) current public procurement environment for making a transition from a traditional paper-based, manual procurement transaction processing and communication to electronic government procurement (e-GP). Some 20 public and private sector organizations, involved in a wide range of functions that relate to public...

  6. Maldives : Electronic Government Procurement Readiness Assessment and Roadmap

    OpenAIRE

    World Bank

    2007-01-01

    The assessment focuses on the degree of readiness of Government of The Maldives's (GoTM's) current public procurement environment for making a transition from traditional paper-based, manual methods of procurement transaction processing and communication to electronic government procurement (e-GP). The e-GP Assessment was discussed individually with informed respondents in the public and p...

  7. 42 CFR 457.940 - Procurement standards.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Procurement standards. 457.940 Section 457.940... Integrity § 457.940 Procurement standards. (a) A State must submit to CMS a written assurance that title XXI... public or private payment rates for comparable services for comparable populations, consistent with...

  8. 7 CFR 220.16 - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ... nature. Matters concerning violation of law are to be referred to the local, State or Federal authority... § 3016.60(b) and (c) of this title are followed. The school food authority may use its own procurement procedures which reflect applicable State and local laws and regulations, provided that procurements made...

  9. An Identification of Problems Relating to Federal Procurement of Library Materials Prepared for Commission on Government Procurement.

    Science.gov (United States)

    Federal Library Committee, Washington, DC.

    The Federal Library Committee through the Task Force on Procurement Procedures in Federal Libraries is examining all problems and is recommending policies, procedures, and practices which will maximize the efficient procurement of library materials. It is suggested that the vehicle for this investigation be the appropriate Commission on Government…

  10. Procurement and participation opportunities

    International Nuclear Information System (INIS)

    Lovatt, D.

    1998-01-01

    The elements which drive the Sable Offshore Energy Project and its procurement processes were described. The project is privately financed, hence business practices must adhere to strict principles to be able to compete with alternative energy sources and to ensure success for all stakeholders including owners, contractors, suppliers and the business community. One of the objectives of the project is to adhere to the requirements of applicable legislation and not to compromise health, safety and environmental standards. To ensure this compliance by all concerned, the regulatory requirements are embedded in the contracting and procurement procedures. Details of the procurement cycle are described. A list of some of the successes that Nova Scotian companies have had in getting work on the project was provided as an illustration of the ingenuity and foresight of these companies to develop appropriate quality assurance and health, safety and environmental procedures, and to bring in the needed capacity and technology through the formation of joint ventures and alliances. The list of contracts represents more than 100 million dollars worth of work to date. 3 figs

  11. IEA Task 24 Solar procurement 2000

    Energy Technology Data Exchange (ETDEWEB)

    Ellehauge, K.; Oestergaard, I. [Teknologisk Institut, Taastrup. SolEnergiCentret (Denmark); Gramkow, L. [Esbensen, Copenhagen (Denmark)

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  12. Turning the Kaleidoscope: Five Perspectives on Procurement

    DEFF Research Database (Denmark)

    Munkgaard Møller, Morten; Vammen, Søren

    Purpose of this paper The purpose of the paper is to provide a conceptual foundation to enhance the body of knowledge related to procurement and sourcing through a framework consisting of five perspectives. The perspectives are: (1) Strategic, (2) Organizational, (3) Capability, (4) Supplier......, and a (5) Customer Perspectives. The aim is to develop a holistic perspective of procurement by applying these five essential, but very different perspectives in order to achieve a holistic picture of the function. Design/methodology/approach The foundation is derived from various well-established theories...... within the five perspectives. Specifically, procurement was viewed from the perspective of organizational theory, network theory, resource/knowledge based views of the firm, transaction cost theory and various theories within the strategic field of research Findings By viewing procurement through...

  13. 75 FR 14576 - Procurement List Additions

    Science.gov (United States)

    2010-03-26

    ... Inspection Service, Minneapolis, MN. M.R. Laundry Products NSN: MR 1103--Heavy Duty Laundry Bag. NSN: MR 1104... procurement list. SUMMARY: This action adds to the Procurement List products and services to be furnished by... products and services and impact of the additions on the current or most recent contractors, the Committee...

  14. Applying e-procurement system in the healthcare: the EPOS paradigm

    Science.gov (United States)

    Ketikidis, Panayiotis H.; Kontogeorgis, Apostolos; Stalidis, George; Kaggelides, Kostis

    2010-03-01

    One of the goals of procurement is to establish a competitive price, while e-procurement utilises electronic commerce to identify potential sources of supply, to purchase goods and services, to exchange contractual information and to interact with suppliers. Extensive academic work has been extensively devoted to e-procurement in diverse industries. However, applying e-procurement in the healthcare sector remains unexplored. It lacks an efficient e-procurement mechanism that will enable hospitals and healthcare suppliers to electronically exchange contractual information, aided by the technologies of optimisation and business rules. The development and deployment of e-procurement requires a major effort in the coordination of complex interorganisational business process. This article presents an e-procurement optimised system (EPOS) for the healthcare marketplace, a complete methodological approach for deploying and operating such system, as piloted in public and private hospitals in three European countries (Greece, Spain and Belgium) and suppliers of healthcare items in the fourth country (Italy). The efficient e-procurement mechanism that EPOS suggests enables hospitals and pharmaceutical and medical equipment suppliers to electronically exchange contractual information.

  15. Critical factors for sustainable food procurement in zoological collections.

    Science.gov (United States)

    Hanson, Jonathan H

    2015-01-01

    Food procurement can play an important role in sustainable food supply chain management by zoos, linking organizational operations to the biodiversity conservation and sustainability mission of zoological collections. This study therefore examines the critical factors that shape sustainable food procurement in zoo and aquariums. Using a web-based survey data was collected from 41 members of the British and Irish Association of Zoos and Aquariums (BIAZA). This included information on the sustainable food procurement practices of these institutions for both their human and animal food supply chains, as well as profile information and data on the factors contributing to and inhibiting sustainable procurement practices. Zoological collections operated by charities, and those with a certified sustainability standard, were found to have significantly higher levels of sustainable food procurement. Zoos and aquariums whose human food operations were not contracted to an external party were also found to have significantly higher levels of sustainable food procurement in their human food supply chain. The most important drivers of sustainable food procurement were cost savings, adequate financial support and improved product quality. The highest ranking barriers were higher costs, other issues taking priority and a lack of alternative suppliers. The results suggest that a number of critical factors shape sustainable food procurement in zoological collections in the British Isles. Financial factors, such as cost savings, were important considerations. The significance of mission-related factors, such as charity status, indicated that core values held by zoos and aquariums can also influence their food procurement practices. © 2015 Wiley Periodicals, Inc.

  16. 41 CFR 101-26.501-5 - Procurement time schedules.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...

  17. Diversification of the possible sources of financing public secondary ...

    African Journals Online (AJOL)

    Education is the most imponant factor of development. The success of public secondary school education is hinged on adequate financing. It is with funds that physical facilities are set up and maintained, equipment procured, goods and services provided and manpower employed and maintained. It is clear that the funding ...

  18. Evaluation of tendered prices of natural mineral water, juice and non-alcoholic beer (public procurement research

    Directory of Open Access Journals (Sweden)

    Nataša Pomazalová

    2011-01-01

    Full Text Available The purpose of this paper is to evaluate tender prices of chosen beverages according to public procurement based on secondary data analysis. The empirical results of analysis (t-test and F-test show that average annual prices of these beverages are different and collected data are not included in the same sample. Tender prices are different in each year of observed years, although are based on public tender. Important evidence is that for the public tenders in the abroad is obligatory use of the Czech public procurement law. According to this act the base evaluation criterion is the lowest offered price. Data were collected during the years 2005–2009. This study deals with empirical approach, variability of prices of chosen beverages based on public tenders between the Czech Republic (Ministry of Defence and local suppliers in Kosovo. Results show low variability of prices, which are based on public tender and legal approach, regulated public procurement. The research conclusion is the fact, that tender prices for piece of non-alcoholic beverage are less than 10 % from annual mean (pcs./CZK of tendered prices.

  19. A Study on Strategic Planning and Procurement of Medicals in Uganda's Regional Referral Hospitals.

    Science.gov (United States)

    Masembe, Ishak Kamaradi

    2016-12-31

    This study was an analysis of the effect of strategic planning on procurement of medicals in Uganda's regional referral hospitals (RRH's). Medicals were defined as essential medicines, medical devices and medical equipment. The Ministry of Health (MOH) has been carrying out strategic planning for the last 15 years via the Health Sector Strategic Plans. Their assumption was that strategic planning would translate to strategic procurement and consequently, availability of medicals in the RRH's. However, despite the existence of these plans, there have been many complaints about expired drugs and shortages in RRH's. For this purpose, a third variable was important because it served the role of mediation. A questionnaire was used to obtain information on perceptions of 206 respondents who were selected using simple random sampling. 8 key informant interviews were held, 2 in each RRH. 4 Focus Group Discussions were held, 1 for each RRH, and between 5 and 8 staff took part as discussants for approximately three hours. The findings suggested that strategic planning was affected by funding to approximately 34% while the relationship between funding and procurement was 35%. The direct relationship between strategic planning and procurement was 18%. However when the total causal effect was computed it turned out that strategic planning and the related variable of funding contributed 77% to procurement of medicals under the current hierarchical model where MOH is charged with development of strategic plans for the entire health sector. Since even with this contribution there were complaints, the study proposed a new model called CALF which according to a simulation, if adopted by MOH, strategic planning would contribute 87% to effectiveness in procurement of medicals.

  20. 41 CFR 101-26.507-2 - Procurement time schedule.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...

  1. Business alignment in the procurement domain: a study of antecedents and determinants of supply chain performance

    Directory of Open Access Journals (Sweden)

    Patrick Mikalef

    2014-01-01

    Full Text Available With organizations now placing an increasing amount on attention on the management of their supply chain activities, the role of Information Technology (IT in supporting these operations has been put in the spotlight. In spite of extensive research examining how IT can be employed in various activities of supply chain management, the majority of studies are limited in identifying enablers and inhibitors of adoption. Empirical studies examining post-adoption conditions that facilitate performance improvement still remain scarce. In this study we focus on procurement as part of the supply chain management activities. We apply the business-IT alignment perspective to the domain of procurement, and examine how certain organizational factors impact the attainment of this state. Additionally, we research the effect that procurement alignment has on supply chain management performance. In order to do so, we apply Partial Least Squares (PLS analysis on a sample of 172 European companies. We find that firms that opt for a centralized governance structure, as well as larger firms, are more likely to attain a state of procurement alignment. Furthermore, our results empirically support the statement that procurement alignment is positively correlated with operational efficiency and competitive performance of the supply chain.

  2. 76 FR 53113 - Guidelines for Designating Biobased Products for Federal Procurement

    Science.gov (United States)

    2011-08-25

    ... Designating Biobased Products for Federal Procurement AGENCY: Office of Procurement and Property Management... that the Department of Agriculture, Office of Procurement and Property Management, is hereby requesting... comments to: Ron Buckhalt, USDA, Office of Procurement and Property Management, Room 361, Reporters...

  3. Improving the effectiveness of public entities procurement practices

    OpenAIRE

    2013-01-01

    M. Com. (Business Management) The media and the Auditor General have extensively reported on the ineffective and unethical conduct of public sector employees regarding the procurement of goods and services. The Auditor General’s report demonstrates that there is evidence that public sector procurement processes are less than adequate to achieve constitutional procurement goals, which are to conduct processes that are fair, equitable, transparent, competitive and cost-effective The delivery...

  4. 41 CFR 101-26.000 - Scope of part.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of part. 101-26.000 Section 101-26.000 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM § 101-26...

  5. 41 CFR 101-26.602-4 - Procurement of coal.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  6. Loose part trapping device in the secondary circuit of a steam generator

    International Nuclear Information System (INIS)

    Poussin, C.; Ayme, H.

    1993-01-01

    The trap is principally formed from mesh filter placed across the annular section of the secondary circuit. The maximum mesh size is less than the distance separating the tubes so that the loose parts cannot caught between the tubular bundle tubes. 6 figs

  7. Lithic raw material procurement for projectiles points in the prehistory of Uruguay

    Directory of Open Access Journals (Sweden)

    José María López Mazz

    2015-03-01

    Full Text Available This paper focuses on current research on early colonisation of the Atlantic coast of South America during the early Holocene. We present advances in the investigation of raw material procurement at the Rincón de los Indios site, located in the eastern part of Uruguay. The technological studies suggest that some aspects of different styles of projectile points are related with environmental adaptation processes, experienced by the first American people in the New World. The occupation of new spaces and new forms of exploitation of resources changes the organisation of lithic technology. The distance to good quality rocks were critical for the opportunities and economic organisation of hunting groups. The study of changes in lithic procurement strategies for projectile points helps us develop a more comprehensive knowledge of this important social adaptation process which occurred during this period. These patterns started to become stabilised in the latter part of the early Holocene across the extended territory and confirm the efficient land occupation associated an intensive hunter-gatherer economies.

  8. 78 FR 48656 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-08-09

    ... Oceanic and Atmospheric Administration, Boulder, CO. Service Type/Location: Laundry Service, US Coast... Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... required to procure the products and services listed below from nonprofit agencies employing persons who...

  9. Measuring the effect of Sustainable Public Procurement

    NARCIS (Netherlands)

    Zijp MC; Kok L; Valk E de; DMG; M&V; M&V

    2018-01-01

    Many purchasing services of the Dutch local and central governments, aim to include the effects of products and services on human health and the environment in the procurement process. Sustainable procurement (SP) encompasses more than just price and quality considerations. SP can result, for

  10. 7 CFR 215.14a - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ... to the local, State or Federal authority that has proper jurisdiction. (c) Procedures. The State... food authority or child care institution may use its own procurement procedures which reflect applicable State or local laws and regulations, provided that procurements made with nonprofit school food...

  11. Optimizing Eco-Efficiency Across the Procurement Portfolio.

    Science.gov (United States)

    Pelton, Rylie E O; Li, Mo; Smith, Timothy M; Lyon, Thomas P

    2016-06-07

    Manufacturing organizations' environmental impacts are often attributable to processes in the firm's upstream supply chain. Environmentally preferable procurement (EPP) and the establishment of environmental purchasing criteria can potentially reduce these indirect impacts. Life-cycle assessment (LCA) can help identify the purchasing criteria that are most effective in reducing environmental impacts. However, the high costs of LCA and the problems associated with the comparability of results have limited efforts to integrate procurement performance with quantitative organizational environmental performance targets. Moreover, environmental purchasing criteria, when implemented, are often established on a product-by-product basis without consideration of other products in the procurement portfolio. We develop an approach that utilizes streamlined LCA methods, together with linear programming, to determine optimal portfolios of product impact-reduction opportunities under budget constraints. The approach is illustrated through a simulated breakfast cereal manufacturing firm procuring grain, containerboard boxes, plastic packaging, electricity, and industrial cleaning solutions. Results suggest that extending EPP decisions and resources to the portfolio level, recently made feasible through the methods illustrated herein, can provide substantially greater CO2e and water-depletion reductions per dollar spend than a product-by-product approach, creating opportunities for procurement organizations to participate in firm-wide environmental impact reduction targets.

  12. Greening Non-Product-Related Procurement

    DEFF Research Database (Denmark)

    Mosgaard, Mette; Riisgaard, Henrik; Huulgaard, Rikke Dorothea

    2013-01-01

    link to the strategy for greening private consumption, as similarities exist and the purchasers lean on their private experiences when purchasing non-product related items; and finally, 3) Intensify the efforts in product categories in which strict normative legislation makes management more motivated....... environmental benefits of millions of procurement decisions do add up to large environmental improvement potentials. Thus, non-product-related procurement focuses on the similarities in the purchases made across different sectors. Explorative interviews with purchasers in Danish companies form the basis...

  13. Does Pharmaceutical Pricing Transparency Matter? Examining Brazil's Public Procurement System.

    Science.gov (United States)

    Kohler, Jillian Clare; Mitsakakis, Nicholas; Saadat, Faridah; Byng, Danalyn; Martinez, Martha Gabriela

    2015-08-04

    We review procurement and pricing transparency practices for pharmaceutical products. We specifically focus on Brazil and examine its approach to increasing pricing transparency, with the aim of determining the level of effectiveness in lower prices using a tool (Banco de Preços em Saúde, BPS) that only reveals purchase prices as compared to other tools (in other countries) that establish a greater degree of price transparency. A general report of Preços em Saúde (BPS) and Sistema Integrado de Administração de Serviços Gerais (SIASG) pricing data was created for 25 drugs that met specific criteria. To explore the linear time trend of each of the drugs, separate regression models were fitted for each drug, resulting in a total of 19 models. Each model controlled for the state variable and the interaction between state and time, in order to accommodate expected heterogeneity in the data. Additionally, the models controlled for procurement quantities and the effect they have on the unit price. Secondary analysis using mixed effects models was also carried out to account for the impact that institutions and suppliers may have upon the unit price. Adjusting for these predictor variables (procurement quantities, supplier, purchasing institution) was important to determine the sole effect that time has had on unit prices. A total of 2 x 19 = 38 models were estimated to explore the overall effect of time on changes in unit price. All statistical analyses were performed using the R statistical software, while the linear mixed effects models were fitted using the lme4 R package. The findings from our analysis suggest that there is no pattern of consistent price decreases within the two Brazilian states during the five-year period for which the prices were analyzed. While the BPS does allow for an increase in transparency and information on drug purchase prices in Brazil, it has not shown to lead to consistent reductions in drug purchase prices for some of the most

  14. Utility procurement policies in the USA

    International Nuclear Information System (INIS)

    Lurf, G.; Nikazmerad, N.M.

    1983-01-01

    The subject is discussed under the headings: introduction; market history (historical uranium demand and production in the USA); recent long-term contract activity (expected US reactor demand and uranium production; expected US reactor demand and contracted uranium supplies); utility procurement attitudes; impact of inventories on procurement; current regulatory environment (spot-market price vs average long-term contract price); embargo and imports; conclusion. (U.K.)

  15. The problems of accountable and analytical procuring of enterprise management

    Directory of Open Access Journals (Sweden)

    Kovalova Tatiana Volodymyrivna

    2016-02-01

    Full Text Available This article investigated main aspects of accountable and analytical procuring of enterprise management. It was found essence of accountable and analytical procuring of enterprise management, purpose, functions and tasks. It was determined main elements and essence of accountable and analytical information taking into consideration needs of modern management. In the article are exposed structural elements of accountable and analytical procuring. It was formed conceptual approaches of building accountable and analytical procuring of enterprise management. It was analyzed main problems of improving accountable and analytical informational procuring of taking managerial decisions with the aim of solving economic problems due to current situation of national economy.

  16. Monitoring and evaluation of green public procurement programs

    Energy Technology Data Exchange (ETDEWEB)

    Adell, Aure [Ecoinstitut, Barcelona (Spain); Schaefer, Bettina [Ecoinstitut, Barcelona (Spain); Ravi, Kavita [US Department of Energy, Washington, DC (United States); Corry, Jenny [Collaborative Labeling and Appliance Standards Program (United States)

    2013-10-15

    Effective procurement policies can help governments save considerable amounts of money while also reducing energy consumption. Additionally, private sector companies which purchase large numbers of energy-consuming devices can benefit from procurement policies that minimize life-cycle energy costs. Both public and private procurement programs offer opportunities to generate market-transforming demand for energy efficient appliances and lighting fixtures. In recent years, several governments have implemented policies to procure energy efficient products and services. When deploying these policies, efforts have focused on developing resources for implementation (guidelines, energy efficiency specifications for tenders, life cycle costing tools, training, etc.) rather than defining monitoring systems to track progress against the set objectives. Implementation resources are necessary to make effective policies; however, developing Monitoring and Evaluation (M and E) mechanisms are critical to ensure that the policies are effective. The purpose of this article is to provide policy makers and procurement officials with a preliminary map of existing approaches and key components to monitor Energy Efficient Procurement (EEP) programs in order to contribute to the improvement of their own systems. Case studies are used throughout the paper to illustrate promising approaches to improve the M and E of EEP programs, from the definition of the system or data collection to complementary instruments to improve both the monitoring response and program results.

  17. 77 FR 29596 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-05-18

    .../Location: Laundry Service, Veterans Administration Medical Center (VAMC), (offsite: 1809 W 2nd Avenue... Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... identified in this notice will be required to procure the products and services listed below from nonprofit...

  18. A Study on Strategic Planning and Procurement of Medicals in Uganda’s Regional Referral Hospitals

    Science.gov (United States)

    2016-01-01

    This study was an analysis of the effect of strategic planning on procurement of medicals in Uganda’s regional referral hospitals (RRH’s). Medicals were defined as essential medicines, medical devices and medical equipment. The Ministry of Health (MOH) has been carrying out strategic planning for the last 15 years via the Health Sector Strategic Plans. Their assumption was that strategic planning would translate to strategic procurement and consequently, availability of medicals in the RRH’s. However, despite the existence of these plans, there have been many complaints about expired drugs and shortages in RRH’s. For this purpose, a third variable was important because it served the role of mediation. A questionnaire was used to obtain information on perceptions of 206 respondents who were selected using simple random sampling. 8 key informant interviews were held, 2 in each RRH. 4 Focus Group Discussions were held, 1 for each RRH, and between 5 and 8 staff took part as discussants for approximately three hours. The findings suggested that strategic planning was affected by funding to approximately 34% while the relationship between funding and procurement was 35%. The direct relationship between strategic planning and procurement was 18%. However when the total causal effect was computed it turned out that strategic planning and the related variable of funding contributed 77% to procurement of medicals under the current hierarchical model where MOH is charged with development of strategic plans for the entire health sector. Since even with this contribution there were complaints, the study proposed a new model called CALF which according to a simulation, if adopted by MOH, strategic planning would contribute 87% to effectiveness in procurement of medicals. PMID:28299158

  19. Management of Contracts for F110 Engine Procurements

    National Research Council Canada - National Science Library

    Granetto, Paul

    2001-01-01

    This audit was performed in response to an allegation to the Defense Hotline that the Wright-Patterson Air Force Base Procurement Contracting Office made poor procurement decisions on F110 aircraft engine contracts...

  20. Optimal Coordinated Strategy Analysis for the Procurement Logistics of a Steel Group

    Directory of Open Access Journals (Sweden)

    Lianbo Deng

    2014-01-01

    Full Text Available This paper focuses on the optimization of an internal coordinated procurement logistics system in a steel group and the decision on the coordinated procurement strategy by minimizing the logistics costs. Considering the coordinated procurement strategy and the procurement logistics costs, the aim of the optimization model was to maximize the degree of quality satisfaction and to minimize the procurement logistics costs. The model was transformed into a single-objective model and solved using a simulated annealing algorithm. In the algorithm, the supplier of each subsidiary was selected according to the evaluation result for independent procurement. Finally, the effect of different parameters on the coordinated procurement strategy was analysed. The results showed that the coordinated strategy can clearly save procurement costs; that the strategy appears to be more cooperative when the quality requirement is not stricter; and that the coordinated costs have a strong effect on the coordinated procurement strategy.

  1. Public procurement as a tool to drive innovation in South Africa ...

    African Journals Online (AJOL)

    This article is an analysis of the use of public procurement as a tool to drive innovation. It explores the meaning of innovative procurement or public procurement of innovation, as well as the rationale for using public procurement to drive innovation. It then focuses on South Africa and evaluates whether there is scope within ...

  2. E-government and e-business integration model in public procurement

    OpenAIRE

    Junevičius, Algis; Ereminaitė, Simona

    2011-01-01

    Public procurement is one of the most actual problems of economics and potential instrument of successful public policy, which can control money flows and manipulate the appearance of corruption opportunities. By 2010, all EU countries should have been installed electronic public procurement systems and at least 50 percent public procurement should have been made by this way. Thus for a membership of different countries' procurers is essential for EU and domestic economy of the Republic of Li...

  3. URGENSI STUDI TENTANG PROCUREMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Yohanes Sogar Simamora

    2006-01-01

    Full Text Available Contractualization is kind of goverment activity in acquiring goods, services and infrastructure as well. Procurement contract has several important function especially in enhancing economic development in a state. In Indonesia, this kind of contract also has function in empowering micro economic scale. Since the aim of procurement study is to provide equal protection between public fund interest in one hand and privat sector in the other hand, general principle of contract law must be taken into consideration together with transparency as the most important principle in government contract.

  4. Innovation and Public Procurement: Terminology, Concepts, and Applications

    DEFF Research Database (Denmark)

    Obwegeser, Nikolaus; Müller, Sune Dueholm

    2018-01-01

    as well as research gaps and opportunities for future research are identified. Based on analysis of existing research, the proposed framework provides an overview of state- of-the-art knowledge, a unified terminology, and a holistic understanding of innovation in public procurement. The framework is both...... review of the literature on innovation in public procurement. From categorizing publications based on innovation drivers, concepts, and research approaches, the emerging structure of the field is described and synthesized into a framework of innovation in public procurement. The proposed framework......The growing awareness of public procurement as an innovation policy tool has recently sparked the interest of both policy makers and researchers. While an increasing number of studies is being published every year, an overview of the field is missing. Researchers, practitioners, and policy makers...

  5. Best Value Procurement - The Practical Approach

    OpenAIRE

    Storteboom, Arnoud

    2017-01-01

    Traditional procurement methods leave much room for improving risk management and value creation. However, Best Value Procurement (BVP) is designed to increase project value by mitigating risks and increasing the transparency by underscoring the pre-award phase. This shift in paradigm is reached by following a sequence of elements with the principles of transparency, performance information measuring and contractor clarification. The BVP philosophy is developed in the USA. Following is ...

  6. Procurement maturity, alignment and performance: a Dutch hospital case comparison.

    NARCIS (Netherlands)

    Plomp, M.; Batenburg, R.

    2009-01-01

    Procurement is an important supporting business function, with which competitive advantage can potentially be achieved. In this paper, the relation between maturity and alignment in procurement on the one hand, and procurement performance on the other, is investigated in the case study setting of

  7. Procurement Maturity, Alignment and Performance: a Dutch Hospital Case Comparison

    NARCIS (Netherlands)

    Plomp, M.G.A.; Batenburg, R.S.

    2009-01-01

    Procurement is an important supporting business function, with which competitive advantage can potentially be achieved. In this paper, the relation between maturity and alignment in procurement on the one hand, and procurement performance on the other, is investigated in the case study setting of

  8. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Science.gov (United States)

    2010-04-01

    ... ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System Standards § 900.49 What procurement standards apply to subcontracts? Each subcontract entered into under the... 25 Indians 2 2010-04-01 2010-04-01 false What procurement standards apply to subcontracts? 900.49...

  9. Antiretroviral procurement and supply chain management.

    Science.gov (United States)

    Ripin, David J; Jamieson, David; Meyers, Amy; Warty, Umesh; Dain, Mary; Khamsi, Cyril

    2014-01-01

    Procurement, the country-level process of ordering antiretrovirals (ARVs), and supply chain management, the mechanism by which they are delivered to health-care facilities, are critical processes required to move ARVs from manufacturers to patients. To provide a glimpse into the ARV procurement and supply chain, the following pages provide an overview of the primary stakeholders, principal operating models, and policies and regulations involved in ARV procurement. Also presented are key challenges that need to be addressed to ensure that the supply chain is not a barrier to the goal of universal coverage. This article will cover the steps necessary to order and distribute ARVs, including different models of delivery, key stakeholders involved, strategic considerations that vary depending on context and policies affecting them. The single drug examples given illustrate the complications inherent in fragmented supply and demand-driven models of procurement and supply chain management, and suggest tools for navigating these hurdles that will ultimately result in more secure and reliable ARV provision. Understanding the dynamics of ARV supply chain is important for the global health community, both to ensure full and efficient treatment of persons living with HIV as well as to inform the supply chain decisions for other public health products.

  10. Energy-efficient Public Procurement: Best Practice in Program Delivery

    Energy Technology Data Exchange (ETDEWEB)

    Payne, Christopher [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Weber, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Semple, Abby [Public Procurement Analysis, London (United Kingdom)

    2013-02-15

    This document illustrates the key issues and considerations involved in implementing energy-efficient public procurement. Our primary sources of information have been our partners in the Super Efficient Equipment and Appliance Deployment (SEAD) Initiative Procurement Working Group. Where applicable, we have highlighted specific ways in which working group participants have successfully overcome barriers to delivering effective programs. The following key points emerge from this analysis of programs for energy-efficient public procurement. Lessons for both developed and developing programs are highlighted throughout the guide. 1. Policy: Policy provides the initiative to begin a transition from first cost to life-cycle cost based purchasing methods and culture. Effective policy is well-communicated, establishes accountability from top to bottom of organizations and simplifies the processes necessary to comply. Flexibility and responsiveness are essential in policy development and implementation. Mandatory and voluntary policies may complement one another. 2. Procurement Criteria: Procurement staff must be confident that energy-efficient procurement criteria offer the best long-term value for their organization’s money and represent real environmental gains. Involving multiple stakeholders at the early stages of the criteria creation process can result in greater levels of cooperation from private industry. Criteria should make comparison of products easy for purchasers and require minimal additional calculations. Criteria will need to be regularly updated to reflect market developments. 3. Training: Resources for the creation of training programs are usually very limited, but well-targeted training is necessary in order for a program to be effective. Training must emphasize a process that is efficient for purchasers and simplifies compliance. Purchaser resources and policy must be well designed for training to be effective. Training program development is an

  11. Pro short-term procurement - U.S. utility

    International Nuclear Information System (INIS)

    Thompson, R.D.

    1990-01-01

    The author expresses the opinion that rather than focusing market discussions around short-term versus long-term procurement strategies, the parties need to be focusing on how long it is going to take to get to a predominantly market-based price both in uranium and enrichment. Long-term contracts are going to be around and will always be an important part of buyers' and sellers' strategies. It is evident that the annual term contract price renegotiations around the world are resulting in continually lower prices. When these price negotiations finally arrive in the range of the market price, a commodity market that resembles other energy commodity markets can be obtained

  12. OAS :: Accountability :: Procurement

    Science.gov (United States)

    OAS, including its organizational structure, each organizational unit's staffing, vacant posts, and a list of procurement notices for formal bids, links to the performance contract and travel control Performance Contract reports from January 2013 to June 2017 may be found.) Travel Information and Control

  13. Critical analysis of procurement techniques in construction management sectors

    Science.gov (United States)

    Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad

    2018-04-01

    Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.

  14. Greening Operations Management: An Online Sustainable Procurement Course for Practitioners

    Science.gov (United States)

    Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian

    2009-01-01

    In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…

  15. Strengthening Procurement Systems in Latin America and the ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... and the development of MSMEs and electronic commerce. Information and Communication Technologies (ICTs) are key to modernizing public administration systems in general and public procurement in particular. In 2002, national government procurement bodies established the Inter-American Network for Government ...

  16. 2015 Status Report on Major Defence Equipment Procurements

    Directory of Open Access Journals (Sweden)

    David Perry

    2015-12-01

    Full Text Available Federal elections may be good for democracy, but the campaigns — particularly the lengthy one recently held in Canada — can be crippling for plans to better arm our military. Just before the election was called, there were public signs of important progress being made in what has long been a frustratingly slow and bureaucratically complex procurement process. But then the campaign left the Department of National Defence and other federal departments unable to secure approvals from either a defence minister or the Treasury Board, until the election ended and the new prime minister appointed the current cabinet. There had already been upheaval prior to that: In the first seven months of 2015, the three senior leaders at the Canadian Forces and the Defence Department (including the minister had been replaced, along with many other people critical to the procurement process. In addition, there had been changes in the Public Works Department and the Defence Procurement Strategy Secretariat. Frustrating and disappointing delays have long been a matter of course in Canada’s defence procurement process. In 2014/15, the number of ministerial or Treasury Board approvals to allow projects to proceed was half of that in 2009/10. Yet the demand for approvals has not abated. In addition to the turnover of key figures involved in the procurement and approval process, delays have come from a number of major steps added to the process, making an already lengthy and complex system even more so. To be sure, these steps were added in the pursuit of improved financial management and project management, with the aim of addressing longstanding problems. But it will take years to see if those objectives have been realized. An irony here is that the budget for military procurement has increased. Between 2004 and 2009, the Defence Department’s procurement budget nearly doubled. But the funding was never matched by the capacity to manage it. In 2003, the Material

  17. Audit the effectiveness of the electronic system of public (state) procurement

    OpenAIRE

    Pysmenna, М.

    2017-01-01

    The study deals with the methodology of the audit the effectiveness of e-environment for public procurement. The purpose of this paper is deepening theoretical and methodological framework for auditing electronic systems for public (government) procurement. Research methods included analysis of legislation in the area of procurement, monitoring of individual transactions of public (state) procurement, interview with the responsible persons of budgetary funds on the assessment of the effective...

  18. 76 FR 5142 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2011-01-28

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement.... Contracting Activity: Department of Transportation, Federal Aviation Administration, Jamaica, NY. Deletion On...

  19. The EU Public Procurement regime - Does It Work?

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Ulff-Møller; Hansen, Lars Gottlieb

    2001-01-01

    Has the Single Market for public procurement had the expected effects after six years in progress? The following article attempts to answer this question by first presenting alternative theoretical approaches to analysing the EU liberalisation of the public procurement market and then confronting...

  20. Opportunities for public procurement procedures efficiency and optimization improvement

    OpenAIRE

    Junevičius, Algis; Ereminaitė, Simona

    2010-01-01

    Public procurement is one of the most actual problems of economics and a potential instrument of successful public policy, which can control money flows and manipulate the appearance of corruption opportunities. Procurement practices are relatively new in the public sector, but everyone knows the complicated regulation and coordination of this process. Despite the fact that society often discus about public procurement problems, the regulation of this process requires an in-depth evaluation b...

  1. Strategic contracting practices to improve procurement of health commodities.

    Science.gov (United States)

    Arney, Leslie; Yadav, Prashant; Miller, Roger; Wilkerson, Taylor

    2014-08-01

    Public-sector entities responsible for procurement of essential medicines and health commodities in developing countries often lack the technical capacity to efficiently ensure supply security. Under strict public scrutiny and pressures to be transparent, many agencies continue to use archaic procurement methods and to depend on inflexible forecasts and cumbersome tendering processes. On the basis of semi-structured literature reviews and interviews, we identified framework agreements as a strategic procurement practice used by the U.S. federal government that may also be suitable for global health supply chains. Framework agreements are long-term contracts that provide the terms and conditions under which smaller repeat purchasing orders may be issued for a defined period of time. Such agreements are common in U.S. and United Nations procurement systems and in other developed countries and multilateral organizations. In contrast, framework agreements appear to be seldom used in procurement of health commodities in countries of sub-Saharan Africa. The current practice of floating tenders multiple times a year contributes to long lead times and stock-outs, and it hampers the manufacturer's or supplier's ability to plan and respond to the government's needs. To date, government's use of strategic contracting practices in public procurement of health commodities has not received much attention in most developing countries. It may present an opportunity for substantial improvements in procurement efficiency and commodity availability. Enabling legislation and strengthened technical capacity to develop and manage long-term contracts could facilitate the use of framework contracts in sub-Saharan Africa, with improved supply security and cost savings likely to result.

  2. Traditional Procurement is too Slow

    Directory of Open Access Journals (Sweden)

    Ann Kong

    2012-11-01

    Full Text Available This paper reports on an exploratory interview survey of construction project participants aimed at identifying the reasons for the decrease in use of the traditional, lump-sum, procurement system in Malaysia. The results show that most people believe it is too slow. This appears to be in part due to the contiguous nature of the various phase and stages of the process and especially the separation of the design and construction phases. The delays caused by disputes between the various parties are also seen as a contributory factor - the most prominent cause being the frequency of variations, with design and scope changes being a particular source of discontent. It is concluded that an up scaling of the whole of the time related reward/penalty system may be the most appropriate measure for the practice in future.

  3. Procurement of green electricity. Guideline for a Europe-wide tender of the supply of green electricity in an open procedure; Beschaffung von Oekostrom. Arbeitshilfe fuer eine europaweite Ausschreibung der Lieferung von Oekostrom im offenen Verfahren

    Energy Technology Data Exchange (ETDEWEB)

    Buchmueller, Christian; Schnutenhaus, Joern [Schnutenhaus und Kollegen, Berlin (Germany)

    2013-05-02

    The power generation from fossil fuels causes high emissions of greenhouse gases. The reduction of the power consumption and the purchase of green power pertain to the politically effective climate protection measures. These emissions can be reduced immediately by means of the purchase of green power. The brochure under consideration details the procurement law and technical foundations of this concept for the procurement of green electricity. Part I of this brochure presents the procurement legal framework and the key points of the concept. In part II concrete assistance for the purchase of green power is given. In Part III, further links are compiled.

  4. Extinction of Chained Instrumental Behaviors: Effects of Procurement Extinction on Consumption Responding

    Science.gov (United States)

    Thrailkill, Eric A.; Bouton, Mark E.

    2015-01-01

    Instrumental behavior often consists of sequences or chains of responses that minimally include procurement behaviors that enable subsequent consumption behaviors. In such chains, behavioral units are linked by access to one another and eventually to a primary reinforcer, such as food or a drug. The present experiments examined the effects of extinguishing procurement responding on consumption responding after training of a discriminated heterogeneous instrumental chain. Rats learned to make a procurement response (e.g., pressing a lever) in the presence of a distinctive discriminative stimulus; making that response led to the presentation of a second discriminative stimulus that set the occasion for a consumption response (e.g., pulling a chain), which then produced a food-pellet reinforcer. Experiment 1 showed that extinction of either the full procurement-consumption chain or procurement alone weakened the consumption response tested in isolation. Experiment 2 replicated the procurement extinction effect and further demonstrated that the opportunity to make the procurement response, as opposed to simple exposure to the procurement stimulus alone, was required. In Experiment 3, rats learned 2 distinct discriminated heterogeneous chains; extinction of 1 procurement response specifically weakened the consumption response that had been associated with it. The results suggest that learning to inhibit the procurement response may produce extinction of consumption responding through mediated extinction. The experiments suggest the importance of an associative analysis of instrumental behavior chains. PMID:25915751

  5. 75 FR 41449 - Procurement List Additions and Deletion

    Science.gov (United States)

    2010-07-16

    ... Customs and Border Protection, Office of Procurement, Washington, DC Service Type/Locations: Laundry.../Locations: Laundry Service, Naval Hospital System, 2800 Child Street, Jacksonville, FL NPA: GINFL Services...: Additions to and deletion from the Procurement List. SUMMARY: This action adds products and services to the...

  6. 22 CFR 226.40 - Purpose of procurement standards.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Purpose of procurement standards. 226.40 Section 226.40 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.40 Purpose...

  7. Develop risk-based procurement management tools for SMEs

    NARCIS (Netherlands)

    Staal, Anne; Hagelaar, Geoffrey; Walhof, Gert; Holman, Richard

    2016-01-01

    This paper provides guidance for developing risk-based management tools to improve the procurement (purchasing) performance of SMEs. Extant academic literature only offers little support on developing such tools and does not consider the wide variety of SMEs. The paper defines a procurement tool for

  8. Corruption in Public Procurement: Finding the Right Indicators

    NARCIS (Netherlands)

    Ferwerda, J.; Deleanu, I.S.; Unger, B.

    2017-01-01

    Red flags are widely used to minimize the risk of various forms of economic misconduct, among which corruption in public procurement. Drawing on criminal investigations, the literature has developed several indicators of corruption in public procurements and has put them forward as viable risk

  9. Corruption in Public Procurement : Finding the Right Indicators

    NARCIS (Netherlands)

    Ferwerda, Joras; Deleanu, Ioana; Unger, Brigitte

    2017-01-01

    Red flags are widely used to minimize the risk of various forms of economic misconduct, among which corruption in public procurement. Drawing on criminal investigations, the literature has developed several indicators of corruption in public procurements and has put them forward as viable risk

  10. Implementing Sustainable Public Procurement : an organisational change perspective

    NARCIS (Netherlands)

    J. Grandia (Jolien)

    2015-01-01

    markdownabstractFor the execution of policies, as well as for its own operations, governments procure goods and services, ranging from paper and pencils to fighter planes, cleaning services and public road works. In the European Union public procurement represents 16% of the gross domestic product.

  11. Diagnostics of Procurement Activity of Industrial Enterprise

    OpenAIRE

    Veretennikova Anna B.

    2012-01-01

    The importance of procurement activity of industrial enterprise is substantiated in the article. The results of the critical analysis of the existing approaches to procurement effectiveness evaluating are presented. The main directions of diagnostics of procurement activity of industrial enterprise such as the quality of the organization and the resources, the effectiveness and efficiency, security of logistics operations.В статье обоснована актуальность диагностирования закупочной деятельнос...

  12. A Framework for Usability Evaluation in EHR Procurement.

    Science.gov (United States)

    Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja

    2018-01-01

    Usability should be considered already by the procuring organizations when selecting future systems. In this paper, we present a framework for usability evaluation during electronic health record (EHR) system procurement. We describe the objectives of the evaluation, the procedure, selected usability attributes and the evaluation methods to measure them. We also present the emphasis usability had in the selection process. We do not elaborate on the details of the results, the application of methods or gathering of data. Instead we focus on the components of the framework to inform and give an example to other similar procurement projects.

  13. QA in the procurement of items and services

    International Nuclear Information System (INIS)

    Wilhelm, H.

    1980-01-01

    Procurement of items and services is one of the important elements during the design and construction of Nuclear Power Plants. The purchaser has to establish and implement controls over the procurement process to ensure that the quality criteria, quality level and other quality requirements specified for the particuliar item or service are taken into account. The effect on safety of an error in service or the malfunction of an item is the most important factor to be considered in determining the extent of quality assurance efforts. A typical example of a procurement process will be demonstrated for safety related mechanical components. (orig./RW)

  14. It is not easy being green: increasing sustainable public procurement behaviour

    NARCIS (Netherlands)

    Grandia, J.; Steijn, A.J.; Kuipers, B.S.

    2015-01-01

    To achieve greater sustainability, governments need to continuously adapt their purchasing activities to innovations in the market. Sustainable procurement is a decision-making process in which the decisions of procurers determine if the full potential of sustainable procurement is used. The

  15. It is not easy being green: increasing sustainable public procurement behaviour

    NARCIS (Netherlands)

    J. Grandia (Jolien); A.J. Steijn (Bram); B.S. Kuipers (Ben)

    2015-01-01

    markdownabstractTo achieve greater sustainability, governments need to continuously adapt their purchasing activities to innovations in the market. Sustainable procurement is a decision-making process in which the decisions of procurers determine if the full potential of sustainable procurement is

  16. Sustainable Public Procurement : a new policy paradigm in France ?

    OpenAIRE

    Le Velly, Ronan

    2010-01-01

    The purpose of this paper is to explore the “new paradigm” of sustainable public procurement in France, that is, its cognitive and normative frameworks. Firstly, the author shows that the newness of this paradigm has to do with the identification of sustainable procurement as a stake in its own right. Next, he shows that the good practices associated with sustainable procurement are also new (close relationships with suppliers, systematic thought about what is needed, innovative methods of co...

  17. 76 FR 37069 - Procurement List; Proposed Additions and Deletion

    Science.gov (United States)

    2011-06-24

    ... Certification The following products and service are proposed for addition to Procurement List for production by... following product is proposed for deletion from the Procurement List: Product Detergent, Laundry NSN: 7930...

  18. Multidimensional procurement auctions with unknown weights

    DEFF Research Database (Denmark)

    Greve, Thomas

    This paper studies the consequences of holding a procurement auction when the principal chooses not to show its preferences. My paper extends the procurement auction model of Che (1993) to a situation where both the principal and the agents have private information. Thus, unknown parameters of bo...... gives rise to an analysis of a principal that can not fully commit to the outcome induced by the scoring rule. Therefore, my result apply to contract theory and it’s problems with imperfect commitment....

  19. 77 FR 51957 - Defense Federal Acquisition Regulation Supplement: Clarification of “F” Orders in the Procurement...

    Science.gov (United States)

    2012-08-28

    ... multi-agency contracts, or basic ordering agreements. The proposed text also directs that a... agreements, or blanket purchase agreements. As a result of the proposed rule, new awards under the AbilityOne... Part 204 Government procurement. Manuel Quinones, Editor, Defense Acquisition Regulations System...

  20. Topical legal aspects of corruption counteraction in public procurement

    Directory of Open Access Journals (Sweden)

    Aleksandr Igorevich Zemlin

    2015-03-01

    Full Text Available Objective to analyze the current developments in the Russian legislation on corruption counteraction and the legislation on public procurement system on this basis to study legal conflicts and gaps and to develop proposals under the provisions of the National AntiCorruption Plan for 2014ndash2015. Methods historical formallegal logical and systemicfunctional structural and contextual approach to the study of law and theoretical propositions concerning the definition nature and characteristics of legal relations arising in the process of and relating to the corruption counteraction in the public procurement system. Results аn aggregate of theoretical conclusions and proposals aimed at perfection of anticorruption legislation and legislation on the contractual public procurement system is presented. Scientific novelty the results of the author39s interpretation of changes in the Russian anticorruption legislation and legislation on the contractual public procurement system existing legal conflicts and gaps. Practical significance developing proposals for improving the standards of anticorruption legislation and legislation on public procurement system under the provisions of the National AntiCorruption Plan for 2014ndash2015. nbsp

  1. Preventing Maladministration in Indonesian Public Procurement : A Good Public Procurement Law Approach and Comparison with the Netherlands and the United Kingdom

    NARCIS (Netherlands)

    Wibowo, R.A.

    2017-01-01

    The aim of this book is to make recommendations concerning the improvement of public procurement law in Indonesia. The author identifies five fundamental problems commonly arising in the pre-contractual phase in Indonesia: the procurement document may be prepared in a way that favours certain

  2. Survey of U.S. Organ Procurement Organizations Regarding Pediatric Organ Donor Management.

    Science.gov (United States)

    Ream, Robert S; Armbrecht, Eric S

    2016-10-01

    To describe the current practice of pediatric organ donor management in the United States for donors declared dead based upon neurologic criteria. The study directs particular attention to how pediatric donors are defined, the use of donor management guidelines, the use of donor management goals, and the involvement of pediatric critical care or transplantation expertise. Cross-sectional observational study using a web-based survey and follow-up telephone interview with respondents from U.S. organ procurement organizations. The study also incorporated organ procurement organization-specific data on organ yield for the 4-year period (2010-2013) preceding the study. The 58 U.S. organ procurement organizations. Respondents chosen by each organ procurement organization. None. All 58 U.S. organ procurement organizations participated in the study. Fifty-two respondents (90%) indicated that their organ procurement organization distinguished pediatric from adult donors resulting in 28 unique pediatric definitions. Thirty-nine organ procurement organizations utilized some form of written pediatric management guidelines, and 27 (47%) maintained pediatric donor management goals; compliance was infrequently monitored for both guidelines (28%) and goals (33%). A pediatric intensivist was always or usually involved in pediatric donor management at 47 organ procurement organizations (81%); transplant/organ recovery surgeons were always or usually involved at 12 organ procurement organizations (21%). There was an increase in the number of organs transplanted per donor among donors 11-17 years old for organ procurement organizations that used donor management goals for the duration of the period studied (p procurement organizations that always or usually consulted a transplant/organ recovery surgeon (p = 0.02) although this did not reach our threshold for statistical significance.. There is little consensus among organ procurement organizations regarding the definition of

  3. 76 FR 14942 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2011-03-18

    ... DFAC. Service Type/Location: Laundry & Dry Cleaning Service, F.E. Warren, AFB, WY. NPA: Goodwill... Service Type/Location: Laundry Service, Atlanta VA Medical Center, Decatur, GA. NPA: GINFL Services, Inc...: Additions to and deletions from the Procurement List. SUMMARY: This action adds services to the Procurement...

  4. 78 FR 53733 - Procurement List Additions and Deletions

    Science.gov (United States)

    2013-08-30

    .../Location: Industrial Laundry Service, Bureau of Engraving and Printing, 9000 Blue Mound Road, Fort Worth...: Additions to and Deletions from the Procurement List. SUMMARY: This action adds products and services to the... severe disabilities, and deletes services from the Procurement List previously provided by such agencies...

  5. 20 CFR 638.806 - Property management and procurement.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Property management and procurement. 638.806 Section 638.806 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS... management and procurement. The Job Corps Director shall develop procedures to establish and maintain a...

  6. Photovoltaic procurement strategies: an assessment of supply issues

    Energy Technology Data Exchange (ETDEWEB)

    Posner, D.; Costello, D.

    1980-02-01

    This review report presents the results of an analysis of alternative approaches to the design of a federal photovoltaics procurement program. Advantages and disadvantages of large purchases at fixed prices and smaller purchases for testing and demonstrating the technology are presented. The objectives and possible impacts of these purchase programs on the photovoltaic industry are described. The reactions of the industry to alternative purchase programs were assessed using personal interviews with selected companies currently active in photovoltaics. The report begins with a review of the impacts of federal procurements on other innovations, including the electronics industry, and suggests the relation of these procurements to photovoltaics. The methodology for conducting the interviews is presented next. The results of the interviews are summarized into possible scenarios of future developments in the industry and into discussions of key issues in the design of a procurement program. An appendix on the current structure of the photovoltaic industry is provided.

  7. Handbook for preparation of Individual Procurement Action Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The Procurement and Assistance Data System (PADS) provides a mechanism for collecting, assembling, organizing, and presenting acquisition and assistance data for the Department of Energy (DOE). This handbook and associated documents establish a uniform system to report acquisition/assistance data to PADS for the collection, processing, and dissemination of official statistical data on the Department`s acquisition and assistance actions. The data provides, based on information available at the time of request, a basis for any recurring and special reports to the senior procurement executive, Congress, General Accounting Office (GAO), Federal executive agencies, Office of management and Budget (OMB), and the general public. It provides information for measuring and assessing the extent to which small business firms and small disadvantages business enterprises are sharing in DOE placement, and for other acquisition and assistance policy and management control purposes. The Handbook for the Preparation of the Individual Procurement Action Report (IPAR) has been designed in two sections; Procurement and Financial Assistance to support the individual forms.

  8. United Kingdom: Procurement Related Nuclear Experience (Operating Experience)

    International Nuclear Information System (INIS)

    2016-01-01

    Procurement of nuclear facilities in the United Kingdom is subject to nuclear site licence conditions issued by the Government through the Office for Nuclear Regulation (ONR). Each nuclear facility in the United Kingdom must have a nuclear site licence and must comply with the 36 general conditions that are set out in the Licence Condition Handbook (October 2014). In addition, the ONR has published a technical assessment guide for the procurement of nuclear safety related items or services; a guide on intelligent customers and a guide on records management also apply to the procurement phase, and ONR interventions look across all three of these documents. Procurement governance arrangements need to be developed (including a policy, manual, procedures and template documents) and approved within the utility company. The ONR monitors the arrangements via interventions and deems the arrangements to be ‘adequate’. Some procurement contracts become lifetime records for nuclear safety related systems and need to be retained while the plant is in place. A formal record retention schedule needs to be created and managed by the procurement organization. The utility company may elect to set hold points during the various procurement stages and, importantly, obtain approval for the contract and its content from all technical stakeholders (with particular emphasis on the engineering, project management and design authority quality functions before contract award). For contracts with high nuclear safety significance, the ONR may enforce additional hold points before and/or after contract award. There is a general requirement that the utility puts in place adequate arrangements to ensure that suitably qualified and experienced personnel are employed to implement adequate management arrangements and to act as an intelligent customer. This includes being able to demonstrate that any contractor or supplier is suitable, capable and experienced, and has the necessary processes and

  9. FORMATION OF THE PUBLIC PROCUREMENT SYSTEM IN THE EURASIAN ECONOMIC UNION

    Directory of Open Access Journals (Sweden)

    Vladimir Vladimirovich Savchenko

    2016-01-01

    Full Text Available The study revealed aspects of the organization of public procurement in the Eurasian Economic Union, outlines approaches to the study of the role of procurement management system in the formation of industrial capabilities to carry out competition in the market activity. The article assesses the eff ectiveness of the fi nancial mechanism in the public procurement system and discusses the dynamics of the procurement process and its features by using the most common competitive methods of procurement. The purpose / goal. The aim of the article is to identify further ways to optimize public procurement system in the Eurasian Economic Union. Tasks article. Develop an acceptable doctrinal foundations for today system of organization of public procurement in the Eurasian Economic Union. Methodology. The author began his research with the setting and the formation of the research objectives. The author defi ned the subject of the study, prepared by the empirical basis of the study. In terms of methodology, this work is an analytical and historical overview of the economic and socio-political processes taking place at the level of individual countries, regions of the world, and the world economy as a whole. Results. This article provides practical recommendations that can be used to create an eff ective integrated system of public procurement in the Eurasian Economic Union.

  10. 78 FR 75912 - Procurement List; Addition and Deletion

    Science.gov (United States)

    2013-12-13

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Addition to and deletion from the Procurement List. SUMMARY: This action adds a service to the Procurement...: General Services Administration, Fort Worth, TX Deletion On 11/1/2013 (78 FR 65618), the Committee for...

  11. 7 CFR 246.24 - Procurement and property management.

    Science.gov (United States)

    2010-01-01

    ... concerning violation of law are to be referred to such local, State or Federal authority as may have proper jurisdiction. (c) State regulations. The State or local agency may use its own procurement regulations which reflect applicable State and local regulations, provided that procurements made with Program funds adhere...

  12. 7 CFR 249.21 - Procurement and property management.

    Science.gov (United States)

    2010-01-01

    ... to such local, State or Federal authority as may have proper jurisdiction. (c) State regulations. The... applicable State and local regulations; and (2) Any procurements made with SFMNP funds adhere to the... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management. 249.21 Section...

  13. 19 CFR 162.11 - Authority to procure warrants.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Authority to procure warrants. 162.11 Section 162.11 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) INSPECTION, SEARCH, AND SEIZURE Search Warrants § 162.11 Authority to procure...

  14. Sequential improvements in organ procurement increase the organ donation rate.

    Science.gov (United States)

    Billeter, Adrian T; Sklare, Seth; Franklin, Glen A; Wright, Jerry; Morgan, Gary; O'Flynn, Paul E; Polk, Hiram C

    2012-11-01

    Organ demand exceeds availability of transplantable organs. Organ procurement continues to suffer from failures to identify potential donors, inability to obtain consent for donation, as well as failures to retrieve certain organs as donor demographics change. The purpose of this article is to propose how sequentially introduced measures can increase organ donation rates as well as improve organ procurement. We analysed the effect of stepwise improvements in the organ procurement process patients in a university-based surgical intensive care unit over a 20-year period. We related newly introduced measures in the organ retrieval process with changes in donation rates. We specifically targeted these three main steps in the donation process: donor identification, conversion of potential donors to actual donors, and organ protection during the procurement process. Finally, we assessed the effect of the same measures on organ procurement after introduction in other hospitals of the same organ procurement region. Introduction of quality improvement steps increased all of the observed parameters. The number of organ donors was stabilised due to a better identification of potential donors, a major increase in conversion from potential to actual donors, and an increase in extended criteria donor. Improvements in organ protection led to higher rates of organs transplanted per donor and increased recovery of lungs and hearts despite increasing donor age. The same measures were introduced successfully in other hospitals in our organ procurement region. Sequential improvements in organ procurement can increase the yield of retrieved organs. The same measures can be applied to other hospitals and lead to comparable improvements in organ donation. Published by Elsevier Ltd.

  15. The role of specification in public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    A taken for granted assertion in the literature discussing how public procurement can be used as a way of stimulating innovation is that functional specification should be applied. Unlike technical specification, where the exact details of the item to be procured is defined, it is assumed that......, by specifying only the function or envisaged performance of the item to be procured, this would allow the submission of bids involving innovative technology and solutions previously unknown to the procurer. The starting point for the article is the perception that these views are commonly held assertions which...... have received limited systematic scholarly attention. The article therefore analyzes specification in relation to buying situations, as knowledge conversion, in terms of resource requirements in relation to different specification levels. The generic conclusion the paper arrives...

  16. Determinants of procurement strategy for construction works: quantity surveyors’ perspectives

    Directory of Open Access Journals (Sweden)

    Olanrewaju AbdulLateef

    2016-01-01

    Full Text Available The selection of the ‘appropriate’ procurement strategy is a prerequisite to the success or failure of a construction project. This paper investigates the factors determining the selection of appropriate procurement strategy for construction works in Nigeria. Data for the study was collected through an online survey questionnaire. The survey administration involves only quantity surveyors. Quantity surveyors were targeted because they advise clients and other stakeholders on procurement and contractual issues on construction works. A total of 33 usable responses were received and analysed for this study. On the basis of the results, it is concluded that the selection of procurement strategies for construction depend on complex interrelated factors. The study could not detect a particular factor or few factors responsible for a procurement strategy selection. The findings of this study is useful because it argues that the construction sector needs to broaden its considerations on the procurement strategy’s determinants rather than focusing solely on the client’s type and nature of projects as is often cited. Future research could segment these factors in terms of class of construction works or increase the sample size, which might lead to different findings.

  17. Current Administrative court practice in the procedure of Public Procurement

    Directory of Open Access Journals (Sweden)

    Silvio Čović

    2017-01-01

    Full Text Available Under the current conditions of complex and difficult economic and social circumstances and given the comparative possibilities and economic effects, the system of public procurement which is firstly at a legal level regulated by the Public Procurement Act 8 (Zakon o javnoj nabavi of 2011 (further referred to as: PPA (ZN, is of particular importance for the entire legal, political and economic system of the Republic of Croatia. Public procurement in essence represents contracting the procurement of goods, works or services. The specifities of that system are comprised, above all, of regulation of entering contractual relations between the public and private sector. Therefore, this system in principle must be formal in order to protect equality of competitors in the public procurement procedure and also in the general interest. Appreciating the legal tradition and indigenous particularities, the author’s fundamental aims consisted of providing and analysing administrative court practice in the context of international legal acquis communautaire showing some legal regulation in practice of disputable aspects of the system of public procurement in Croatia and the doubts emerging from current administrative court practice.

  18. An Empirical Evaluation Of The Potential Of Public E-Procurement To Reduce Corruption

    Directory of Open Access Journals (Sweden)

    Arjun Neupane

    2014-06-01

    Full Text Available One of the significant potential benefits of e-procurement technology is reducing opportunities for corruption in public procurement processes. The authors identified anti-corruption capabilities of e-procurement through an extensive literature review and a theoretical model representing the impact of three latent variables: monopoly of power, information asymmetry, and transparency and accountability upon the dependent variable, the intent-to-adopt e-procurement. This research was guided by the Principal-Agent theory and collected the perceptions of 46 government officers of the potential of public e-procurement to reduce corruption in public procurement processes. Results were analysed using the Partial Least Squares Structural Equation Modeling (PLS-SEM approach. The findings suggest that the intent-to-adopt e-procurement has a positive and significant relationship with the independent variables that might inform developing countries in strategies to combat corruption in public procurement.

  19. Transplant Procurement Management Model Training: Marked Improvement in the Mindset of In-Hospital Procurement Coordinators at Hyogo Prefecture, Japan.

    Science.gov (United States)

    Yoshikawa, M; Yoshinaga, K; Imamura, Y; Hayashi, T; Osako, T; Takahashi, K; Kaneko, M; Fujisawa, M; Kamidono, S

    2016-09-01

    The organ donation rate in Japan is much lower than that in other developed countries for several reasons. An advanced educational program for in-hospital procurement coordinators is a possible solution for this. We introduced a Transplant Procurement Management (TPM) educational program at Hyogo Prefecture, Japan. Ten healthcare professionals at Hyogo Prefecture participated in the Advanced International TPM course to educate themselves on TPM and held 2 TPM Model Organ Procurement Training Workshops at Hyogo Prefecture for in-hospital procurement coordinators. Furthermore, we held 2 workshops outside Hyogo Prefecture and at the same time undertook a pre-workshop questionnaire survey to evaluate the ability and motivation with respect to organ donation. To evaluate the effectiveness of the workshops, we conducted post-workshop and 3-months-after workshop questionnaire surveys. The results of the pre-workshop survey revealed that in-hospital procurement coordinators lacked the knowledge regarding the entire organ donation process, the current status of organ donation in Japan, and the definition of brain death. Moreover, they did not completely understand the meaning of "organ donation." The results of the post-workshop questionnaire survey showed that the educational program was effective to improve the knowledge and skills of organ donation and motivated behavioral changes among the participants. The survey results showed that our TPM model educational program offered sufficient knowledge and skills to increase organ donation at Hyogo Prefecture. We will continue this program and make an effort to further contribute to the Japanese organ donation activities. Copyright © 2016 Elsevier Inc. All rights reserved.

  20. Economic risks of the system of state and municipal procurement

    Directory of Open Access Journals (Sweden)

    Belokrylova Olga, S.

    2015-12-01

    Full Text Available In the paper the audit of economic risks at all stages of procurement for state and municipal needs from both customers and bidders is carried out on the basis of the implementation of the integrated approach . Stages in the procurement under a single contract system, which is characterized by the high economic risks are planning, supplier selection, conclusion and execution of the contract. A number of the measures according to the localization of economic risks are offered, in particular the implementation of compliance programs, which institutionalize the compliance by the organization, anti-corruption legislation; increasing qualification of specialists in public procurement and increased control through centralization of procurement.

  1. Procurement guideline for oil recovery boats; Oeljyntorjuntaveneen hankintaohje

    Energy Technology Data Exchange (ETDEWEB)

    Pajala, J.

    2011-12-15

    These guidelines have been compiled to assist in the procurement of oil recovery boats, with the intention of ensuring that new boats meet the future needs of oil spill response operations and that procurement will be carried out in a manner that is economically sound and technologically well-founded. Furthermore, the guidelines are intended to encourage the development and adoption of new solutions for oil recovery boats. The issues covered by these guidelines include: Multiple uses of boats, classification of boats and class-specific requirements, the principle of sustainable development and the boats' lifecycle, qualification to be set for the crews, procurement timeline, regulations and guidelines, inspections and approvals. (orig.)

  2. 78 FR 27369 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2013-05-10

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and Deletion from the Procurement List. SUMMARY: This action adds products to the Procurement..., Philadelphia, PA. Deletion On 4/5/2013 (78 FR 20622-20623), the Committee for Purchase From People Who Are...

  3. Routines and Communities of Practice in Public Environmental Procurement Processes

    OpenAIRE

    Larsen, Katarina; Svane, Örjan

    2005-01-01

    Environmental procurement has received increasing attention as a policy tool promoting change towards sustainable consumption and production. The successful implementation of public environmental procurement policy requires the establishment of new routines for user-producer-supplier relationships that enable the integration of environmental aspects. The aim of the study is to analyse the roles of different communities of practice and learning patterns in environmental procurement processes. ...

  4. Achievements and Challenges: Implementing a 1:1 Program in a Secondary School

    Science.gov (United States)

    Keane, Therese; Keane, William

    2017-01-01

    This longitudinal study explores one secondary school's approach towards implementing a one computer to one student (1:1) program, which commenced in 2011. Prior to 2011, the school was not very technologically advanced, mainly due to financial constraints which impacted on infrastructure, procurement of hardware and software, the availability of…

  5. Design of reactive power procurement in deregulated electricity market

    African Journals Online (AJOL)

    user

    novel reactive power procurement model is proposed, which ensure secure and ..... The simulation is performed in the Matlab. .... focus of this paper is a reactive procurement market model, which is a basically two-step optimization process.

  6. A Conjecture on Institutional Rationalities and Property Rights in Public Procurement of Innovation

    DEFF Research Database (Denmark)

    Ågren, Robert; Rolfstam, Max

    2013-01-01

    The increased interest in using public procurement as a policy tool for innovation has renewed a need for understanding the procurement process. A conjecture on institutional rationalities and property rights is offered to explain the hurdles present for conducting successful procurement projects....... If an efficient negotiation solution is to be achieved participants in procurement projects need to be aware of the other participants’ institutional rationalities and actively consider these while concluding the terms of procurement projects. Consequently, future policy efforts towards increased innovation have...... to be targeting the process of public procurement of innovation, rather than focusing on regulatory issues....

  7. War Reserve Analysis and Secondary Item Procureability Assessment of the AMCOM Supported Weapon Systems

    National Research Council Canada - National Science Library

    Maddux, Gary

    2000-01-01

    .... IOD evaluates the impacts of nonavailability of secondary items on the life cycle supportability of AMCOM weapon systems and evaluates the producibility of secondary items for war reserve requirements...

  8. Corporate Social Responsibility and Sustainability in Danish Public Procurement

    DEFF Research Database (Denmark)

    Andrecka, Marta

    2017-01-01

    understand the continuously developing concepts of SPP, as well as to identify the drivers and barriers that promote or hinder its further implementation. This article firstly deals with the relationship between the concepts of sustainability, Corporate Social Responsibility (CSR) and public procurement....... Secondly, as Denmark has been known as a pioneer in sustainable development, including implementation of it in public purchasing this article focuses on recent developments in the areas of CSR and sustainable public procurement in Denmark, and analyses relevant Danish Public Procurement Complaints Board...

  9. Future Capacity Procurements Under Unknown Demand and Increasing Costs

    OpenAIRE

    Apostolos Burnetas; Stephen Gilbert

    2001-01-01

    In this paper we study a situation in which a broker must manage the procurement of a short-life-cycle product. As the broker observes demand for the item, she learns about the demand process. However, as is often the case in practice, it becomes either more difficult or more expensive to procure the item as the selling season advances. Thus, the broker must trade off higher procurement costs against the benefit of making ordering decisions with better information about demand. Problems of th...

  10. The Investigation and Elimination of Public Procurement Fraud in Government Sectors (A Case Study in Indonesia’s Procurement System: Cases from 2006 to 2012)

    OpenAIRE

    Maulidi, Ach

    2017-01-01

    This paper offers insights to enhance our understanding of public procurement fraud through analyzing current 173 cases during 2006 to 2012 in Indonesia’s procurement system using various points of view. These insights are synthesized from current research findings and contemporary thinking elaborated by practical knowledge and skills, the aim of which is to produce accurate analysis. The main aim of this paper is to participate in terms of combating procurement fraud by suggesting plausible ...

  11. Procuring complex performance:case: public infrastructure projects

    OpenAIRE

    Leppänen, T. (Tero)

    2015-01-01

    Abstract This research studies procuring complex performance (PCP) in the case of public infrastructure projects. Focus of the research is on the interface between public clients and private sector contractors. Purpose of this research is to find out what are the main challenges of different project delivery methods according to literature (RQ1) and what are the practical challenges of public procurement (RQ2). As an end re...

  12. Price competition in procurement

    International Nuclear Information System (INIS)

    Keisler, J.M.; Buehring, W.A.

    1996-07-01

    When creating a private market to provide a public good, government agencies can influence the market's competitive characteristics. Markets have predictable, but often counterintuitive, behaviors. To succeed in applying available controls, and thereby reduce future costs, agencies must understand the behavior of the market. A model has been constructed to examine some issues in establishing competition for a structure in which there are economies of scale and government is obligated to purchase a fixed total quantity of a good. This model is used to demonstrate a way to estimate the cost savings from several alternative plans for a buyer exploring competitive procurement. The results are not and cannot be accurate for budgeting purposes; rather, they indicate the approximate magnitude of changes in cost that would be associated with changes in the market structure within which procurement occurs

  13. Challenges facing procurement professionals in developing economies: Unlocking value through professional international purchasing

    Directory of Open Access Journals (Sweden)

    Marian Tukuta

    2015-04-01

    Objectives: The purpose of this article was to examine the critical role played by the procurement function in business and to reveal the challenges faced by procurement professionals in developing economies as well as to suggest solutions to these challenges. Method: A sequential literary analysis was used, complemented by cross-country qualitative data gathered from one hundred diverse procurement practitioners from Botswana, Namibia and Zimbabwe. These were primarily participants in a series of procurement workshops run by the researchers from January to June 2014. Results: Findings suggested that limited recognition, increasing unethical behaviour, poor supplier service delivery, poor regulatory environment, varying supplier standards and poor corporate governance are the main challenges faced by the procurement profession in these countries. Conclusion: The study’s findings imply that there is limited understanding regarding the role procurement plays in both government and non-government institutions in developing economies. The article suggests solutions which procurement professionals and organisations can implement in order to unlock the potential value in the procurement function.

  14. Sustainable Procurement in the United Nations

    DEFF Research Database (Denmark)

    Lund-Thomsen, Peter; Costa, Nives

    2011-01-01

    are highly contested among UN procurement officers and member states. However, so far the debate has mostly been based on assumptions about how the implementation of SP might affect developing country stakeholders. In fact, very few academic studies have been made of the economic, social and environmental......This paper deals with the integration of economic, social and environmental criteria into the purchasing practices of the United Nations (UN) system--also known as the UN engagement in sustainable procurement (SP). We argue that the debates about the pros and cons of the UN engaging in SP...

  15. The role and duties of client in public procurement management

    Directory of Open Access Journals (Sweden)

    Joković Radomir V.

    2015-01-01

    Full Text Available Public procurement is given great importance in all developed countries. The subject of this paper is to present the application of basic concepts of project management from the standpoint of public procurement in the higher education institution. Previous research, by examining the literature of domestic and foreign authors, and analysis of project performance management model is defined by the public procurement in the higher education institution whose application can improve overall process performance lrojekta and contribute to economic and efficient implementation of planned activities and time for reaching the goals. One of the objectives of model application of project management procurement at a higher education institution is to identify and determine the type and quantity of goods, uspuga, works, studies of conditions that influence their purchase, as well as finding ways of ensuring that goods, services, papers are available on the project in due time. This paper presents a model of project management public procurement in the higher education institution.

  16. Good Governance in Public Procurement: A South African Case Study

    Directory of Open Access Journals (Sweden)

    R Roos

    2008-08-01

    Full Text Available In this article good governance in public procurement, with particular reference to accountability is discussed. The principle of providing adequate remedies in public procurement is put under the spotlight. This is done with reference to the decision in Steenkamp NO v Provincial Tender Board, Eastern Cape. In this case the Constitutional Court had to consider whether an initially successful tenderer could lodge a delictual claim for damages to compensate for expenses incurred after conclusion of a contract, which was subsequently rendered void on an application for review of the tender award. The applicable principles of good governance and the applicable provisions of the UNCITRAL Model Law on Public Procurement and the WTO plurilateral Government Procurement Agreement are analysed. This is done to enable an evaluation of the decision by the Constitutional Court in the above case. It is concluded that the South African public procurement system does in this instance comply with the basic principles of good governance with regard to accountability.

  17. 13 CFR 121.407 - What are the size procedures for multiple item procurements?

    Science.gov (United States)

    2010-01-01

    ... Requirements for Government Procurement § 121.407 What are the size procedures for multiple item procurements? If a procurement calls for two or more specific end items or types of services with different size... multiple item procurements? 121.407 Section 121.407 Business Credit and Assistance SMALL BUSINESS...

  18. Organ procurement from executed prisoners in China.

    Science.gov (United States)

    Sharif, A; Singh, M Fiatarone; Trey, T; Lavee, J

    2014-10-01

    Organ procurement from executed prisoners in China is internationally condemned, yet this practice continues unabated in 2014. This is despite repeated announcements from Chinese authorities that constructive measures have been undertaken to conform to accepted ethical standards. While there is unanimous agreement on the unethical nature of using organs from executed prisoners, due to its limitations on voluntary and informed consent, there is insufficient coverage of forced organ procurement from prisoners of conscience without consent. Strategies to influence positive change in China over the last few decades have failed to bring this practice to an end. While organ donation and transplantation services in China have undergone considerable structural changes in the last few years, fundamental attempts to shift practice to ethically sourced organs have floundered. In this article, we discuss the organ trade in China, reflect upon organ procurement from executed prisoners (including both capital prisoners and prisoners of conscience) and provide an overview of contradictory Chinese efforts to halt forced organ procurement from executed prisoners. Finally, we highlight current actions being taken to address this issue and offer comprehensive recommendations to bring this ethically indefensible practice to an immediate end. © Copyright 2014 The American Society of Transplantation and the American Society of Transplant Surgeons.

  19. United Kingdom's defence procurement: a period of smart enlightenment or halting culture

    OpenAIRE

    O Callaghan, D. M.

    2001-01-01

    The aim of this thesis is to map predominant cultures and examine their compatibility with the Smart Procurement Initiative. An initiative that was identified in the Strategic Defence Review to address the limitations of UK's defence procurement process that had previously failed to deliver defence equipment to cost, time and specification. The introduction reviews those factors, which influenced procurement since World War 11. The background to UK's current procurement process...

  20. 78 FR 21348 - Procurement List; Additions and Deletions; Recissions

    Science.gov (United States)

    2013-04-10

    ... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions and Deletions; Recissions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Rescission of Previous Procurement List Decision. SUMMARY: The Committee for Purchase...

  1. Strategic FM Procurement: an issue of aligning services to business needs

    DEFF Research Database (Denmark)

    Katchamart, Akarapong; Shiem-shin, Danny Then

    2014-01-01

    Purpose – To illustrate the interdependence between business need and strategic decision on facilities management (FM) procurement model. This interdependence underpins the reason behind strategic decision on FM procurement. It would assist decision makers on FM services procurement that fulfills...... business needs and enriches business outcomes. Design/methodology/approach – By a systematic review of FM-related literature, this research structures and investigates on three aspects of this interdependence between business delivery and FM services: 1. What characteristics of core business impact on FM...... service and provision? 2. What are the interconnections between business support and FM procurement decisions? and 3. What are the available FM services procurement options? Findings – There are four types of core business characteristics that impacts on FM services and provision based on the degree...

  2. (DeCentralization of Public Procurement at the Local Level in the EU

    Directory of Open Access Journals (Sweden)

    Boštjan BREZOVNIK

    2015-10-01

    Full Text Available The so-called decentralization of public procurement in EU Member States is accepted as the most suitable design of the public procurement system, often justifi ed by greater economic effi ciency and by the possibility of boosting the development of small and medium-sized enterprises, which act on the public procurement market as providers of goods, services and works. Despite the existence of highly decentralized public procurement systems which refl ect the decentralization of administrative systems, especially after the recession, there is a stronger tendency for centralization of public procurement in the EU. The so-called aggregation of demand by contracting authorities can be done in order to achieve economies of scale, including lower prices and transaction costs as well as to improve and professionalize the management of procurement procedures (as highlighted in the Directive 2014/24/EU by the European Parliament and the EU Council. However, even in the context of public procurement centralization, local contracting authorities (i.e., public administration authorities and organizations in Member States should be provided with a suffi ciently wide range of possible (centralized organizational structures and contractual (vertical and horizontal public-public partnerships which will allow them to select the most suitable and most economically effective organizational structure for the execution of public procurement.

  3. Energy wood procurement in connection with conventional wood procurement; Energiapuun hankinnan organisointi muun puunhankinnan yhteydessae - PUUT02

    Energy Technology Data Exchange (ETDEWEB)

    Maekinen, P. [Finnish Forest Research Institute, Vantaa (Finland)

    2001-07-01

    The research consisted of two sub-projects. The present role of forestry associations in procurement of energy wood was investigated in the first sub- project. The possibilities and willingness of them to increase the energy wood procurement were also studied. The role of forest machine and forestry service entrepreneurs in procurement of energy wood was investigated in the second sub-project. The effects of energy wood procurement on the operation of the forest machine companies in general were also studied in this sub-project. The sub-project three studied the requirements of the customer companies for the energy wood suppliers. All the material of the sub-projects was collected by personal inquiries. According to the executive directors of the forestry associations the role of the forestry associations in energy wood procurement varied between a by-stander and active participant. Active forestry associations announced the companies for stands available for cutting. They told also that they directed the harvesting to correct sites and deliver stems at the roadside. The role of the forestry association was emphasised especially when the associations on the basis of a letter of attorney carried out the timber trade. It was estimated that in the near future the operation of forest machine entrepreneurs in harvesting of energy wood would increase significantly. From the employment and turnover point of view the role of harvesting of energy wood was not seen as a significant matter. On the other hand, that harvesting of energy wood impede the harvesting of commercial timber was seen as a more significant matter. In the future the end-users of energy wood would like to have more competition in the energy wood markets. However, the energy wood suppliers were desired to be relative large so that the reliability of deliveries could be ensured. Simultaneously as the end-users wanted to decrease the price of forest chips, the machine entrepreneurs estimated the price to

  4. Tanzania : Country Procurement Assessment Report, Volume 2. Main Report and Annexes

    OpenAIRE

    World Bank

    2003-01-01

    This Country Procurement Assessment Report (CPAR)intends to determine the compatibility of national procurement law, and practices, with the principles of economy, and with international procurement practices. This CPAR, the second of its kind in Tanzania, looks at the legislative framework, the performance of regulatory functions, the enforcement regime, and the capacity of public sector ...

  5. International Government-Procurement Obligations of the United States: An Overview

    National Research Council Canada - National Science Library

    Tatelman, Todd B

    2005-01-01

    .... The most notable agreements are contained in the World Trade Organization (WTO) Agreement on Government Procurement and the procurement chapter of the North American Free Trade Agreement (NAFTA...

  6. (De)Centralization of Public Procurement at the Local Level in the EU

    OpenAIRE

    Boštjan BREZOVNIK; Žan Jan OPLOTNIK; Borut VOJINOVIĆ

    2015-01-01

    The so-called decentralization of public procurement in EU Member States is accepted as the most suitable design of the public procurement system, often justifi ed by greater economic effi ciency and by the possibility of boosting the development of small and medium-sized enterprises, which act on the public procurement market as providers of goods, services and works. Despite the existence of highly decentralized public procurement systems which refl ect the decentralization of administrativ...

  7. 48 CFR 2901.603-72 - Administrative procurement management reviews.

    Science.gov (United States)

    2010-10-01

    ... Authority, and Responsibilities 2901.603-72 Administrative procurement management reviews. (a) The Senior... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Administrative procurement management reviews. 2901.603-72 Section 2901.603-72 Federal Acquisition Regulations System DEPARTMENT OF...

  8. [Posthumous sperm procurement and use--ethical and legal dilemmas].

    Science.gov (United States)

    Crha, I; Dostál, J; Ventruba, P; Kudela, M; Záková, J

    2004-07-01

    To present a review of bioethical discussion and recommendations concerning posthumous sperm procurement and postmortem parenthood. Review article. Department of Obstetrics and Gynecology, Masaryk University, Brno, Department of Obstetrics and Gynecology, Palacky University, Olomouc. Literature search in Database of Abstracts of Reviews of the Evidence (DARE) and MEDLINEplus. Posthumous sperm procurement and cryopreservation must be performed within 36 hours after death. To established appropriate medical practice, it is important to consider all stakeholders in the decision-making process: the deceased, the requesting party, the child, the physician and the society. There are only few legislative measures concerning postmortem parenthood and posthumous sperm procurement. The essential elements for postmortem reproduction are: judicial order, ethics committee approval, bereavement period of at least 6 month before use. Posthumous sperm procurement is fraught with ethical and legal implications. All stakeholder should be considered. Society for reproductive medicine should prepare acceptable standard protocol.

  9. 24 CFR 943.148 - What procurement standards apply to PHAs selecting partners for a joint venture?

    Science.gov (United States)

    2010-04-01

    ... PHAs selecting partners for a joint venture? 943.148 Section 943.148 Housing and Urban Development... VENTURES Subsidiaries, Affiliates, Joint Ventures in Public Housing § 943.148 What procurement standards apply to PHAs selecting partners for a joint venture? (a) The requirements of part 85 of this title are...

  10. PROCUREMENT AND CONTRACT MANAGEMENT

    CERN Multimedia

    Training & Development Group; Linda Orr-Easo; Tel. 72460; Nathalie Dumeaux; Tel. 78144

    2001-01-01

    We are pleased to announce the launch of a new training on: Procurement and Contract Management (This seminar will be run by CERN experts in French or in English) Level 1 The aim is to raise awareness of the key issues involved. Date : 8 June 2001 This level is open to everyone. Participants should register via our Web page as soon as possible. Level 2 To develop the skills needed to effectively manage contracts, from the Technical, Commercial and Legal aspects. Dates : Three days, Autumn 2001 This Level is open to those who are/will be more directly responsible for procurement and contract management. Participants should have followed Level 1. For a description of the seminar, please consult:   Level 1: http://training.web.cern.ch/Training/MANCO/P9798/9-cm_e.htm Level 2: http://training.web.cern.ch/Training/MANCO/P9798/9-cm2_e.htm

  11. The impact of preferential procurement in South African construction ...

    African Journals Online (AJOL)

    The impact of preferential procurement in South African construction industry. ... The outcome of this study shows that there are problems in the implementation of PPPFA during tendering and procurement processes and procedures for achieving success in government projects. Key words: HDIs, PPPFA, Policies, ...

  12. Sustainable promotion nuclear power enterprise procurement bidding risk management

    International Nuclear Information System (INIS)

    Wu Yimin

    2014-01-01

    Nuclear power enterprise procurement bidding work faced with certain risk in recent years, the domestic nuclear power enterprises in the bidding work never stop research and explore the effective ways to guard against legal risks, and has made considerable progress, the eighteenth big country advocates the safety and efficiency of nuclear power development policy, in the face of the subsequent nuclear power construction projects have started, nuclear power enterprise bidding risk management work shoulder heavy responsibilities article through nuclear power enterprise procurement bidding risk management present situation, proposed the sustainable promotion nuclear power enterprise procurement bidding risk management countermeasures. (author)

  13. Analysis of Market Concentration in Selected Sectors of Public Procurement

    Directory of Open Access Journals (Sweden)

    Petr Svoboda

    2016-01-01

    Full Text Available The goal of this article is the analysis of influence of market concentration in selected areas of public procurement on chosen parameters of public procurement in years 2007 and 2011. Five concentration ratios and five parameters of contracts are calculated for each of five chosen areas of public tenders in 2007 and 2011. After this task, the correlation analysis between concentration ratios and parameters of contracts is done for finding out mutual relation between these two variables. Correlation analysis is then compared with four created hypotheses about the relationship between market concentration and parameters of public procurement The results of the analysis are surprising, because in most cases, the stated hypotheses were rejected, meaning that the correlations between the parameters of public procurement and market concentration were different than this study predicted based on economic theory. The possible reasons for this result, discussed in the article, are corruption and also poor quality of data from Information system of public procurement administered by the Ministry for Regional Development of Czech Republic.

  14. GPP Webinar: Solar Procurement Templates and Tools for Higher Education

    Science.gov (United States)

    Green Power Partnership webinar on solar procurement for Higher Education which features various tools and templates that schools can use to shape and manage the solar procurement process to a successful outcome.

  15. Integration of a nationally procured electronic health record system into user work practices

    Directory of Open Access Journals (Sweden)

    Cresswell Kathrin M

    2012-03-01

    Full Text Available Abstract Background Evidence suggests that many small- and medium-scale Electronic Health Record (EHR implementations encounter problems, these often stemming from users' difficulties in accommodating the new technology into their work practices. There is the possibility that these challenges may be exacerbated in the context of the larger-scale, more standardised, implementation strategies now being pursued as part of major national modernisation initiatives. We sought to understand how England's centrally procured and delivered EHR software was integrated within the work practices of users in selected secondary and specialist care settings. Methods We conducted a qualitative longitudinal case study-based investigation drawing on sociotechnical theory in three purposefully selected sites implementing early functionality of a nationally procured EHR system. The complete dataset comprised semi-structured interview data from a total of 66 different participants, 38.5 hours of non-participant observation of use of the software in context, accompanying researcher field notes, and hospital documents (including project initiation and lessons learnt reports. Transcribed data were analysed thematically using a combination of deductive and inductive approaches, and drawing on NVivo8 software to facilitate coding. Results The nationally led "top-down" implementation and the associated focus on interoperability limited the opportunity to customise software to local needs. Lack of system usability led users to employ a range of workarounds unanticipated by management to compensate for the perceived shortcomings of the system. These had a number of knock-on effects relating to the nature of collaborative work, patterns of communication, the timeliness and availability of records (including paper and the ability for hospital management to monitor organisational performance. Conclusions This work has highlighted the importance of addressing potentially adverse

  16. 76 FR 66913 - Procurement List Proposed Additions and Deletions

    Science.gov (United States)

    2011-10-28

    ...&M, Philadelphia, PA. Service Service Type/Location: Industrial Laundry Service, Bureau of Engraving... proposing to add products and service to the Procurement List that will be furnished by nonprofit agencies... identified in this notice will be required to procure the products and service listed below from nonprofit...

  17. 48 CFR 1323.404-70 - DOC affirmative procurement program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOC affirmative procurement program. 1323.404-70 Section 1323.404-70 Federal Acquisition Regulations System DEPARTMENT OF..., OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials 1323.404-70 DOC affirmative procurement...

  18. Procurement strategy formation : (re-)designing rail infrastructure project alliances

    NARCIS (Netherlands)

    Plantinga, Henrico; Dorée, André

    2016-01-01

    Purpose – The purpose of this paper is to provide insights into the reasoning behind the development of new procurement approaches by public sector clients. Design/methodology/approach – A case study approach focuses on a procurement development process by a public sector client. It investigates the

  19. Sustainable Public Procurement: Realization of the Social Aspect in Republic of Lithuania

    Directory of Open Access Journals (Sweden)

    Virginijus Kanapinskas

    2014-12-01

    Full Text Available Public procurement concentrates large public sector’s purchasing power, and has a significant impact on each country’s economic development. The purpose of public procurement procedure is transparency, non-discrimination and accordance to the principles of fair competition in acquisition of goods, services and works necessary for the smooth functioning of the public administration. Besides, public procurement can be one of the most important instruments for sustainable development and other purposes useful to the whole society and the economy of the country. This article briefly discusses the concept of sustainable public procurement, reveals its main ideas and applications. One of them, the social sphere, was chosen the main object of the research. The possibility to decrease unemployment, to increase an integration of socially vulnerable group, and to achieve other socially-oriented goals through an effective implementation of the social aspect of sustainable public procurement has been illustrated. Thus, the article analyses the concept of social procurement, assesses the current situation in Lithuania, overviews the good practice of other countries and provides recommendations for measures to extend the application of socially oriented procurement.

  20. University Procurement Officers’ Use of Technology When Seeking Information

    Directory of Open Access Journals (Sweden)

    Yahel Giat

    2016-05-01

    Full Text Available The transition from printed to electronic sources of information has resulted in a profound change to the way procurement officers seek information. Furthermore, in the past decade there have been additional technological revolutions that are expected to further affect the procurement process. In this paper, we conduct a survey among forty nine university procurement officers in Israel to examine to what extent procurement officers have adapted to smartphones and tablets by testing how frequently officers use notebooks, smartphones, and tablets for work-related and leisure purposes. We find that while officers prefer electronic sources of information over printed sources of information, officers have not yet adapted to the later technological advances (i.e., smartphones and tablets. Notebooks are more frequently used than either smartphones or tablets for work-related and leisure purposes. One explanation behind this result is that officers are not skilled in using smartphone and tablets applications. This implies that training officers in the use of these devices may improve their performance.

  1. 41 CFR 101-26.602-1 - Procurement of lubricating oils, greases, and gear lubricants.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of... Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.6-Procurement Sources Other Than GSA § 101...

  2. Entering the United States Federal Procurement Market: success factors and barriers for foreign firms.

    NARCIS (Netherlands)

    Vehof, Tim; Telgen, Jan; Ruel, Hubertus Johannes Maria; Ruel, H.J.M.

    2012-01-01

    The US federal procurement market is the largest procurement market in the world. Therefore, it is an attractive market for foreign companies to enter. Existing literature indicates the success factors and barriers for public procurement market entry in general, however not for the US procurement

  3. Rethinking health sector procurement as developmental linkages in East Africa.

    Science.gov (United States)

    Mackintosh, Maureen; Tibandebage, Paula; Karimi Njeru, Mercy; Kariuki Kungu, Joan; Israel, Caroline; Mujinja, Phares G M

    2018-03-01

    Health care forms a large economic sector in all countries, and procurement of medicines and other essential commodities necessarily creates economic linkages between a country's health sector and local and international industrial development. These procurement processes may be positive or negative in their effects on populations' access to appropriate treatment and on local industrial development, yet procurement in low and middle income countries (LMICs) remains under-studied: generally analysed, when addressed at all, as a public sector technical and organisational challenge rather than a social and economic element of health system governance shaping its links to the wider economy. This article uses fieldwork in Tanzania and Kenya in 2012-15 to analyse procurement of essential medicines and supplies as a governance process for the health system and its industrial links, drawing on aspects of global value chain theory. We describe procurement work processes as experienced by front line staff in public, faith-based and private sectors, linking these experiences to wholesale funding sources and purchasing practices, and examining their implications for medicines access and for local industrial development within these East African countries. We show that in a context of poor access to reliable medicines, extensive reliance on private medicines purchase, and increasing globalisation of procurement systems, domestic linkages between health and industrial sectors have been weakened, especially in Tanzania. We argue in consequence for a more developmental perspective on health sector procurement design, including closer policy attention to strengthening vertical and horizontal relational working within local health-industry value chains, in the interests of both wider access to treatment and improved industrial development in Africa. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.

  4. Procurement Under The UNCITRAL Model Law: A Southern Africa Perspective

    Directory of Open Access Journals (Sweden)

    Stephen De La Harpe

    2015-12-01

    Full Text Available In Africa, economic integration, realised through regional integration, is seen as one of the driving factors that will improve the lives of its people. To enable regionalisation, economic growth and to unlock the potential of Africa its infrastructure will have to be improved. Infrastructure will on the whole be realised through public procurement. The stages for opening up procurement markets, referred to by Yukins and Schooner, is discussed and it is concluded that the states in SADC is still in the initial stages of opening its public procurement markets for regional competition. Although COMESA is not yet in full compliance with all four the stages great strides have been made and have elements of all stages been addressed. Because of the influence the Model Law has already played in COMESA, and the rest of Africa, it would be contra productive should SADC not take the same route as COMESA. If regard is had to the four categories of procurement rules that serves as barriers to national procurement markets, as set out by Arrowsmith it is clear that all of these are present in most SADC member states. Also in the case of COMESA these barriers still exist albeit to a lesser extent. What is necessary is a phased approach to address all of these barriers. This will be possible under the UNCITRAL Model Law as the 2011 Model Law does provide for the possibility of complying with international obligations and for states to allow for socio economic objectives in their procurement regimes. There can be little doubt that the 1994 Model Law has already had a marked influence on public procurement regulation in Africa and that the 2011 Model Law will in future continue to do so. Public procurement is essential for economic development and is the integration and harmonisation thereof on a regional basis the first step In this regard SADC, and especially South Africa, has an important role to play.

  5. Evaluating the practice of the Design-Build procurement method in South Africa

    Directory of Open Access Journals (Sweden)

    Babsola Olubunmi Ilori

    2017-12-01

    Full Text Available A well implemented good practice of Design-Build procurement method brings different disciplines and aspects of construction process together, which in turn minimizes the incidents of constructors having to repeat work, and thus, result in cost and time savings. This type of procurement method increases the probability of a successful project that meets the expectations of all stakeholders. A bad practice of Design–Build procurement method increases the probability that the project’s performance will be compromised and that some or all of the stakeholders disappointed. The aim of this research is to determine whether Design-build procurement method is rightly practiced in South Africa. Data were collected from consultants and contractors using a structured questionnaire via personal contact and email. The collected data were subjected to descriptive statistical analyses. This paper argues that design-build procurement is not correctly practiced in South Africa. This may be due to the late introduction and the level of understanding of the procurement method.

  6. Procurement Policy for Armored Vehicles

    National Research Council Canada - National Science Library

    Jolliffe, Richard B; Burton, Bruce A; Carros, Deborah L; Schaefer, Beth K; Truong, Linh; Palmer, Kevin A; Chun, Judy M; Smith, Jessica M; Abraham, Amanda M; Peters, Anthony R

    2007-01-01

    Congresswoman Louise M. Slaughter requested that the Inspector General (IG), DoD review the DoD procurement history for body armor and armored vehicles and determine whether officials properly followed contracting policies...

  7. Empirical Analysis of Competition in Procurement Auctions

    OpenAIRE

    Tukiainen, Janne

    2008-01-01

    A vast amount of public services and goods are contracted through procurement auctions. Therefore it is very important to design these auctions in an optimal way. Typically, we are interested in two different objectives. The first objective is efficiency. Efficiency means that the contract is awarded to the bidder that values it the most, which in the procurement setting means the bidder that has the lowest cost of providing a service with a given quality. The second objective is to maximize ...

  8. NASA's Electronic Procurement System and the Impact on Small Business

    Science.gov (United States)

    Dozier, Ken

    1998-01-01

    Three workshops, held in Lancaster, Orange County and Compton, were produced by the Los Angeles Regional Technology Alliance (LARTA) and NASA Far West Technology Transfer Center (FWRTTC). The workshops were held on December 12, 1997, February 5, 1998, and March 30, 1998, respectively. The purpose behind these workshops was to spread information regarding NASA procurement opportunities to small businesses in the region. This was accomplished by inviting economic and business development organizations to the three workshops, presenting NASA procurement resources to them, and asking them to distribute this information to the small businesses in their communities. With the assistance of LARTA, marketing and publicity in the form of direct mail, telemarketing, and promotion via a web site was implemented to publicize the workshops. These methods were remarkably effective because they enabled the workshops to attain its full capacity. Further publicity was provided by Wendy Reed of Valley Focus Magazine, an Antelope Valley Magazine aimed at business people. Her article entitled, "Doing Business with the Government" recapped the Lancaster workshop that she had attended and made references to several presentations. In the article, she discussed selling to the government via electronic commerce, and specifically mentioned Robert Medina, the NASA Dryden Small Business Specialist, as a contact person for those interested in pursuing procurement opportunities. The feedback provided by the participants is illustrated by the enclosed graphs and charts. These figures represent the number of participants who have frequented web sites presented at workshops, specifically the NASA procurement resources, and how extensive information dissemination was. Input from participants was favorable and encouraged more NASA Dryden workshops directly to the small business communities. There was an overwhelming response to the benefit of the NASA procurement opportunities presented at the

  9. 40 CFR Appendix P to Part 50 - Interpretation of the Primary and Secondary National Ambient Air Quality Standards for Ozone

    Science.gov (United States)

    2010-07-01

    ... the data handling procedures for the reported data). 2.3Comparisons with the Primary and Secondary... Secondary National Ambient Air Quality Standards for Ozone P Appendix P to Part 50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS NATIONAL PRIMARY AND SECONDARY AMBIENT AIR QUALITY...

  10. 75 FR 36363 - Procurement List: Proposed Additions and Deletions

    Science.gov (United States)

    2010-06-25

    ... Homeland Security, U.S. Coast Guard, Washington, DC Service Type/Location: Laundry Service, USDA National... proposing to add products and services to the Procurement List that will be furnished by nonprofit agencies... Government identified in this notice will be required to procure the products and services listed below from...

  11. 76 FR 76808 - Procurement Thresholds for Implementation of the Trade Agreements Act of 1979

    Science.gov (United States)

    2011-12-08

    ... Organization (WTO) Agreement on Government Procurement, Chapter 15 of the United States-Australia Free Trade... out U.S. trade agreement obligations under the WTO Agreement on Government Procurement, Chapter 15 of... Agreement on Government Procurement A. Central Government Entities Listed in U.S. Annex 1 (1) Procurement of...

  12. Social protection of marginal part-time, self-employment and secondary jobs in the Netherlands

    NARCIS (Netherlands)

    Vonk, Gijsbert; Jansen, Annette

    In many European countries, marginal part-time, (solo-) self-employment and secondary jobs has been increasing since the last decades. The question about the provision of social protection and labour legislation for these types of employment is the starting point for a project entitled “Hybrid

  13. Chemistry related to the procurement of vanadium alloys

    International Nuclear Information System (INIS)

    Smith, H.M.; Chung H.M.; Tsai, H.C.

    1997-01-01

    Evaluation of trace element concentrations in vanadium alloys is important to characterize the low-activation characteristics and possible effects of trace elements on the properties. Detailed chemical analysis of several vanadium and vanadium alloy heats procured for the Argonne vanadium alloy development program were analyzed by Johnson-Matthey (UK) as part of a joint activity to evaluate trace element effects on the performance characteristics. These heats were produced by normal production practices for high grade vanadium. The analyses include approximately 60 elements analyzed in most cases by glow-discharge mass spectrometry. Values for molybdenum and niobium, which are critical for low-activation alloys, ranged from 0.4 to 60 wppm for the nine heats

  14. Chemistry related to the procurement of vanadium alloys

    Energy Technology Data Exchange (ETDEWEB)

    Smith, H.M.; Chung H.M.; Tsai, H.C. [Argonne National Lab., IL (United States)

    1997-08-01

    Evaluation of trace element concentrations in vanadium alloys is important to characterize the low-activation characteristics and possible effects of trace elements on the properties. Detailed chemical analysis of several vanadium and vanadium alloy heats procured for the Argonne vanadium alloy development program were analyzed by Johnson-Matthey (UK) as part of a joint activity to evaluate trace element effects on the performance characteristics. These heats were produced by normal production practices for high grade vanadium. The analyses include approximately 60 elements analyzed in most cases by glow-discharge mass spectrometry. Values for molybdenum and niobium, which are critical for low-activation alloys, ranged from 0.4 to 60 wppm for the nine heats.

  15. Controlled procurement for nuclear power plants

    International Nuclear Information System (INIS)

    MacFarlane, I.S.

    1985-01-01

    A method is presented for establishing a controlled materials management system that facilitates materials procurement at nuclear power plants. This method is based on the determination of informational data requirements, appropriate input and approvals, and extent of administrative controls. Implementation of the techniques described herein will ensure that the accuracy of important procurement information is not compromised by unauthorized initial input or changes and/or failure to maintain the information. Needed material can thus be ordered through the materials management system with a high degree of confidence that the correct items are ordered, with minimal internal lead time and minimum delays during the receiving process

  16. Human rights violations in organ procurement practice in China.

    Science.gov (United States)

    Paul, Norbert W; Caplan, Arthur; Shapiro, Michael E; Els, Charl; Allison, Kirk C; Li, Huige

    2017-02-08

    Over 90% of the organs transplanted in China before 2010 were procured from prisoners. Although Chinese officials announced in December 2014 that the country would completely cease using organs harvested from prisoners, no regulatory adjustments or changes in China's organ donation laws followed. As a result, the use of prisoner organs remains legal in China if consent is obtained. We have collected and analysed available evidence on human rights violations in the organ procurement practice in China. We demonstrate that the practice not only violates international ethics standards, it is also associated with a large scale neglect of fundamental human rights. This includes organ procurement without consent from prisoners or their families as well as procurement of organs from incompletely executed, still-living prisoners. The human rights critique of these practices will also address the specific situatedness of prisoners, often conditioned and traumatized by a cascade of human rights abuses in judicial structures. To end the unethical practice and the abuse associated with it, we suggest to inextricably bind the use of human organs procured in the Chinese transplant system to enacting Chinese legislation prohibiting the use of organs from executed prisoners and making explicit rules for law enforcement. Other than that, the international community must cease to abet the continuation of the present system by demanding an authoritative ban on the use of organs from executed Chinese prisoners.

  17. Opto-mechanical assembly procurement for the National Ignition Facility

    International Nuclear Information System (INIS)

    House, W.; Simon, T.

    1999-01-01

    A large number of the small optics procurements for the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) will be in the form of completely assembled, tested, and cleaned subsystems. These subsystems will be integrated into the NIF at LLNL. To accomplish this task, the procurement packages will include, optical and mechanical drawings, acceptance test and cleanliness requirements. In January 1999, the first such integrated opto-mechanical assembly was received and evaluated at LLNL. With the successful completion of this important trial procurement, we were able to establish the viability of purchasing clean, ready to install, opto-mechanical assemblies from vendors within the optics industry. 32 vendors were chosen from our supplier database for quote, then five were chosen to purchase from. These five vendors represented a cross section of the optics industry. From a ''value'' catalog supplier (that did the whole job internally) to a partnership between three specialty companies, these vendors demonstrated they have the ingenuity and capability to deliver cost competitive, NIF-ready, opto- mechanical assemblies. This paper describes the vendor selection for this procurement, technical requirements including packaging, fabrication, coating, and cleanliness specifications, then testing and verification. It also gives real test results gathered from inspections performed at LLNL that show how our vendors scored on the various requirements. Keywords: Opto-Mechanical, assembly, NIF, packaging, shipping, specifications, procurement, MIL-STD-1246C, surface cleanliness

  18. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2010-01-01

    strong requirements on the management style and company culture. Limitations of the research: The research is only based on two case studies, which obviously limits the possibility to generalize the results. Practical applications: The research presents two specific examples of innovative procurement......Aim: The aim of the paper is to present, analyse and identify learning from two case studies of innovative procurement in Facilities Management (FM) concerning the establishments of partnerships between clients and providers. Approach and methodology: A major study of FM best practice covering 36...

  19. Government procurement, preferences and international trading rules : the South African case

    OpenAIRE

    DUBE, Memory; JOHANNES, Liezemarie; LEWIS, David

    2015-01-01

    This paper reviews the South African government procurement regime and asks whether adherence to international trading instruments and rules, and in particular the World Trade Organisation’s Government Procurement Agreement, would, and should, permit the maintenance of national policy criteria in the decision making matrix for procurement, whilst simultaneously enabling it to realise the efficiency gains of trade liberalisation. It also examines the likely impact, if any, that adherence to th...

  20. EU contribution to the procurement of the ITER blanket first wall

    International Nuclear Information System (INIS)

    Lorenzetto, Patrick; Banetta, Stefano; Bellin, Boris; Boireau, Bruno; Bucci, Philippe; Cicero, Tindaro; Conchon, Denis; Dellopoulos, Georges; Hardaker, Stephen; Marshall, Paul; Nogué, Patrice; Pérez, Marcos; Gutierrez, Leticia Ruiz; Samaniego, Fernando; Sherlock, Paul; Zacchia, Francesco

    2016-01-01

    Highlights: • Presentation of the blanket first wall design concept to be procured by Europe. • Presentation of the main outcome of the R&D programme with the resulting FW fabrication route. • Presentation of the ITER first wall pre-qualification programme with the results achieved so far. • Presentation of the on-going irradiation experiments. • Presentation of the EU procurement strategy. - Abstract: Fusion for Energy (F4E), the European Union’s Domestic Agency for ITER, is responsible for the procurement of about 50% of the ITER blanket first wall (FW), called normal heat flux FW. A procurement strategy has been implemented by the In-Vessel Project Team at F4E aimed at mitigating technical and commercial risks for the procurement of ITER blanket FW panels, promoting as far as possible competition among industrial partners. This procurement strategy has been supported by an extensive Research and Development (R&D) programme, implemented over more than 15 years in Europe, to develop various fabrication technologies. It includes in particular the manufacture and testing of small-scale, medium-scale mock-ups and full-scale prototypes of blanket FW panels. In this R&D programme, significant efforts have been devoted to the development of a reliable materials joining technique. Hot Isostatic Pressing was selected for the manufacture of the FW panels made from beryllium, copper–chromium–zirconium alloy and 316L(N)-IG austenitic stainless steel. This paper presents the main outcome of the on-going R&D programme, the latest results of the FW qualification programme together with the procurement strategy implemented by F4E for the supply of the European contribution to the procurement of the ITER blanket FW.

  1. EU contribution to the procurement of the ITER blanket first wall

    Energy Technology Data Exchange (ETDEWEB)

    Lorenzetto, Patrick, E-mail: Patrick.Lorenzetto@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Banetta, Stefano; Bellin, Boris [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Boireau, Bruno [AREVA NP, Centre Technique, 71200 Le Creusot (France); Bucci, Philippe [Atmostat, rue René Hamon 31, 94815 Villejuif Cedex (France); Cicero, Tindaro [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Conchon, Denis [Atmostat, rue René Hamon 31, 94815 Villejuif Cedex (France); Dellopoulos, Georges [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Hardaker, Stephen [Amec Foster Wheeler plc, Booths Park, Chelford Road, Knutsford WA16 8QZ (United Kingdom); Marshall, Paul [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Nogué, Patrice [AREVA NP, Centre Technique, 71200 Le Creusot (France); Pérez, Marcos [Leading Enterprises SL, Pasaje de La Agüera, 39409 San Felices de Buelna (Spain); Gutierrez, Leticia Ruiz [Iberdrola Ingeniería y Construcción S.A.U., Avenida Manoteras 20, 28050 Madrid (Spain); Samaniego, Fernando [Leading Enterprises SL, Pasaje de La Agüera, 39409 San Felices de Buelna (Spain); Sherlock, Paul [Amec Foster Wheeler plc, Booths Park, Chelford Road, Knutsford WA16 8QZ (United Kingdom); Zacchia, Francesco [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain)

    2016-11-01

    Highlights: • Presentation of the blanket first wall design concept to be procured by Europe. • Presentation of the main outcome of the R&D programme with the resulting FW fabrication route. • Presentation of the ITER first wall pre-qualification programme with the results achieved so far. • Presentation of the on-going irradiation experiments. • Presentation of the EU procurement strategy. - Abstract: Fusion for Energy (F4E), the European Union’s Domestic Agency for ITER, is responsible for the procurement of about 50% of the ITER blanket first wall (FW), called normal heat flux FW. A procurement strategy has been implemented by the In-Vessel Project Team at F4E aimed at mitigating technical and commercial risks for the procurement of ITER blanket FW panels, promoting as far as possible competition among industrial partners. This procurement strategy has been supported by an extensive Research and Development (R&D) programme, implemented over more than 15 years in Europe, to develop various fabrication technologies. It includes in particular the manufacture and testing of small-scale, medium-scale mock-ups and full-scale prototypes of blanket FW panels. In this R&D programme, significant efforts have been devoted to the development of a reliable materials joining technique. Hot Isostatic Pressing was selected for the manufacture of the FW panels made from beryllium, copper–chromium–zirconium alloy and 316L(N)-IG austenitic stainless steel. This paper presents the main outcome of the on-going R&D programme, the latest results of the FW qualification programme together with the procurement strategy implemented by F4E for the supply of the European contribution to the procurement of the ITER blanket FW.

  2. PVUSA procurement, acceptance, and rating practices for photovoltaic power plants

    Energy Technology Data Exchange (ETDEWEB)

    Dows, R.N.; Gough, E.J.

    1995-09-01

    This report is one in a series of PVUSA reports on PVUSA experiences and lessons learned at the demonstration sites in Davis and Kerman, California, and from participating utility host sites. During the course of approximately 7 years (1988--1994), 10 PV systems have been installed ranging from 20 kW to 500 kW. Six 20-kW emerging module technology arrays, five on universal project-provided structures and one turnkey concentrator, and four turnkey utility-scale systems (200 to 500 kW) were installed. PVUSA took a very proactive approach in the procurement of these systems. In the absence of established procurement documents, the project team developed a comprehensive set of technical and commercial documents. These have been updated with each successive procurement. Working closely with vendors after the award in a two-way exchange provided designs better suited for utility applications. This report discusses the PVUSA procurement process through testing and acceptance, and rating of PV turnkey systems. Special emphasis is placed on the acceptance testing and rating methodology which completes the procurement process by verifying that PV systems meet contract requirements. Lessons learned and recommendations are provided based on PVUSA experience.

  3. Regulations in the German countries in the field of green public procurement

    Energy Technology Data Exchange (ETDEWEB)

    Hermann, Andreas; Acker, Hendrik [Oeko-Institut e.V. - Institut fuer Angewandte Oekologie e.V., Freiburg im Breisgau (Germany)

    2011-12-15

    The task of the Oeko-Institut e.V. (Freiburg, Federal Republic of Germany) consisted in creating an overview of the regulations currently in force at country level concerning the promotion of green public procurement. The investigation focused on legally binding targets contributing to the green public procurement of goods and services. Of particular interest to the investigation was the question of whether the countries have in the intervening period heeded the call of the Federal government on the procurement of energy-intensive products and services or the joint instruction on the procurement of wood products. The aim of the investigation under consideration was to use the overview to make a contribution to the description of the status quo in green public procurement in Germany and, where applicate, to identify examples of best practice.

  4. West Bank and Gaza : Country Procurement Issues Paper

    OpenAIRE

    World Bank

    2008-01-01

    The main aim of the CPIP is to assess the current state of pubic procurement in West Bank and Gaza in the form of a ''snap shot'' and accordingly, to provide a partial assessment, broadly along the lines of the OPCS paper that would address the following objectives. First, to assess the latest progress with regard to the procurement reform recommended by the 2004 CPAR and the commitment of...

  5. Strategic and Operational Benefits of Electronic Integration in B2B Procurement Processes

    OpenAIRE

    Tridas Mukhopadhyay; Sunder Kekre

    2002-01-01

    Our goal is to assess the strategic and operational benefits of electronic integration for industrial procurement. We conduct a field study with an industrial supplier and examine the drivers of performance of the procurement process. Our research quantifies both the operational and strategic impacts of electronic integration in a B2B procurement environment for a supplier. Additionally, we show that the customer also obtains substantial benefits from efficient procurement transaction process...

  6. Efektivitas Pengadaan Barang dan Jasa secara Elektronik (E-procurement) pada Lpse Kota Pekanbaru

    OpenAIRE

    Swadesi, Utari; Sadad, Abdul

    2017-01-01

    This research is based on the phenomenon is still often the occurrence of corruption, collusion and nepotism (KKN) practices of goods and services by the government. So that e-procurement can be an instrument to prevent and reduce corruption, collusion and nepotism (KKN) because through e-procurement program, procurement of goods and services can further improve transparency and accountability, increase market access and fair business competition, Improve the efficiency of the procurement pro...

  7. A Planning Framework for the Deployment of Innovative Information and Communication Technologies in Procurement

    Science.gov (United States)

    Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg

    The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.

  8. E-invoicing in EU public procurement as a tool for cross border trade barriers elimination

    Directory of Open Access Journals (Sweden)

    Oleksandr TSARUK

    2015-12-01

    Full Text Available Public Procurement of goods and services always was one of the principal element of e-procurements because it effects economic growth, describes governments' public services and national competitiveness, level of human capital growth in a long run. Furthermore, researching EU policy on e-procurements demands to observe legislature essence and technological models of e-procurement solutions because none of which has not been developed as the universal one yet. Basic European agreements on public procurements and trade, combining with the currently used public procurement models, force to develop a commonly used framework for all EU countries. Monitoring of EU e-procurement system as model for implementation at Eastern partnerships countries was also suggested.

  9. Procurement Sustainable Building Practice

    NARCIS (Netherlands)

    Schmid, P.

    1998-01-01

    Two aspects will be stressed in the frame of this topic: The Procurement Aspects and the Aspects of Conflict and Dispute Resolution. The Right for Environment - to introduce the following aspects - is not only the consequence of care-taking for Nature as an admirable phenomenon, but also as a source

  10. The World Bank Group and Public Procurement--An Independent Evaluation : Appendixes to Volume 1

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  11. Vascularized Composite Allografts: Procurement, Allocation, and Implementation.

    Science.gov (United States)

    Rahmel, Axel

    Vascularized composite allotransplantation is a continuously evolving area of modern transplant medicine. Recently, vascularized composite allografts (VCAs) have been formally classified as 'organs'. In this review, key aspects of VCA procurement are discussed, with a special focus on interaction with the procurement of classical solid organs. In addition, options for a matching and allocation system that ensures VCA donor organs are allocated to the best-suited recipients are looked at. Finally, the different steps needed to promote VCA transplantation in society in general and in the medical community in particular are highlighted.

  12. Controlling fuel costs: Procurement strategies and regulatory standards

    International Nuclear Information System (INIS)

    Einhorn, H.A.; Levi, B.I.

    1992-01-01

    Since the oil price shocks and inflation of the 1970s, regulatory authorities and utilities have devoted considerable attention to controlling energy costs while maintaining reliable service. Although much of this concern has been directed towards capital cost containment, increasing scrutiny has been applied to a broad range of variable costs, especially to fuel procurement expenditures. With some 40% to 65% of the electric utility industry's annual operation and maintenance expenses paid to secure fuel supplies, even a small difference in fuel costs could have a substantial impact on costs to ratepayers. This increased attention to fuel cost containment can be expected to intensify as implementation of the 1990 amendments to the Clean Air Act affects fuel purchase decisions. To assure that fuel is purchased in a responsible and cost-effective manner, some state jurisdictions have initiated periodic reviews (audits) of the procurement practices that electric utilities follow when purchasing fuel. While a utility must demonstrate how it purchases fuel, there is wide variation in interest and scope of audits among jurisdictions. In this paper, the authors review: (1) the regulatory environment within which fuel procurement and audits occur, and (2) some particularly controversial issues that will receive increasing attention as the practice of conducting fuel procurement audits spreads

  13. Navy Ship Procurement: Alternative Funding Approaches - Background and Options for Congress

    National Research Council Canada - National Science Library

    O'Rourke, Ronald

    2005-01-01

    Some observers have proposed procuring Navy ships using incremental funding or advance appropriations rather than the traditional full funding approach that has been used to procure most Navy ships...

  14. Navy Ship Procurement: Alternative Funding Approaches - Background and Options for Congress

    National Research Council Canada - National Science Library

    O'Rourke, Ronald

    2006-01-01

    Some observers have proposed procuring Navy ships using incremental funding or advance appropriations rather than the traditional full funding approach that has been used to procure most Navy ships...

  15. Extra-Judicial Complaints Review: First Experiences of the Dutch Public Procurement Experts Committee

    NARCIS (Netherlands)

    Jansen, C.E.C.; Janssen, J.G.J.; Muntz-Beekhuis, J.S.

    2014-01-01

    Article 4.27 of the Dutch Public Procurement Act 2012 (‘Aanbestedingswet’) provides for a statutory basis for extra-judicial public procurement complaints review by an independent body: The Public Procurement Experts Committee (‘Commissie van Aanbestedingsexperts’), hereinafter referred to as: ‘the

  16. Experience of public procurement of Open Compute servers

    Science.gov (United States)

    Bärring, Olof; Guerri, Marco; Bonfillou, Eric; Valsan, Liviu; Grigore, Alexandru; Dore, Vincent; Gentit, Alain; Clement, Benoît; Grossir, Anthony

    2015-12-01

    The Open Compute Project. OCP (http://www.opencompute.org/). was launched by Facebook in 2011 with the objective of building efficient computing infrastructures at the lowest possible cost. The technologies are released as open hardware. with the goal to develop servers and data centres following the model traditionally associated with open source software projects. In 2013 CERN acquired a few OCP servers in order to compare performance and power consumption with standard hardware. The conclusions were that there are sufficient savings to motivate an attempt to procure a large scale installation. One objective is to evaluate if the OCP market is sufficiently mature and broad enough to meet the constraints of a public procurement. This paper summarizes this procurement. which started in September 2014 and involved the Request for information (RFI) to qualify bidders and Request for Tender (RFT).

  17. Public procurement of innovation in construction : A design science approach

    NARCIS (Netherlands)

    Lenderink, B.; Halman, J. I.M.; Voordijk, J.T.

    2016-01-01

    The inclusion of innovation as a policy objective in public procurement has increased significantly at public organizations over the last years. However, public organizations often struggle with how they should stimulate innovation through public procurement as there are many different ways possible

  18. Interlopers at the Fringes of Empire: The Procurators of the Propaganda Fide Papal Congregation in Canton and Macao, 1700-1823

    Directory of Open Access Journals (Sweden)

    Eugenio Menegon

    2017-12-01

    Full Text Available The office of the procurator of the papal Sacred Congregation for the Propagation of the Faith (Sacra Congregatio de Propaganda Fide offers a unique case study of noncommercial interloping in the long eighteenth century in the Pearl River Delta, and reveals the complexity and fluidity of life at the intersection of Asian and European maritime environments in that special human ecosystem. The oceanic infrastructure of the Age of Sail and the Sino-Western trade system in Canton sustained the Catholic missionary enterprise in Asia, and the professional figure of the procurator represented its economic and political linchpin. Procurators were agents connected with both European and Qing imperial formations, yet not directly at their service. They utilized existing maritime trade networks to their own advantage without being integral parts of those networks’ economic mechanisms. All the while, they subverted Qing prohibitions against Christianity. Using sources preserved in Rome, this article offers new insights into the global mechanisms of trade, communication, and religious exchange embodied by the procurators-interlopers and their networks, with significant implications for the history of the Sino-Western trade system, Qing policies toward the West and Christianity, and the history of Asian Catholic missions.

  19. Malawi : Country Procurement Assessment Report, Volume 3. Executive Summary

    OpenAIRE

    World Bank

    2004-01-01

    The Malawi Country Procurement Assessment Report is a joint undertaking between the Malawi Government and the World Bank to analyze the country procurement system and recommend appropriate actions to improve the efficiency, economy and transparency of the system. This report is divided into (a) an Executive Summary, (b) Main Report on Findings and Recommendations, and (c) Annexes. Since th...

  20. Technology-neutral green procurement in practice - an example from Swedish waste management.

    Science.gov (United States)

    Arvidsson, Anders; Stage, Jesper

    2012-05-01

    Green public procurement has been criticized for its excessive reliance on detailed technology specifications, which can distort incentives in the short term and discourage innovation in the longer term. Economists therefore tend to prefer technology-neutral procurement, which rewards outcomes rather than technologies. However, technology-neutral procurement can also be problematic in practice. The present study investigated green public procurement of waste management, a rapidly growing field. In one of the most sophisticated models for technology-neutral procurement applied in Sweden in recent years, different environmental impacts were assigned weights, but no weight was given to the particular technology employed. Even here, however, potential inefficiencies were found where the scoring rule could have led to arbitrary, and presumably unwanted, outcomes. Explicitly assigning monetary surcharges to desirable and undesirable environmental effects may be a better way to reach environmental targets.

  1. Roles of sex and ethnicity in procurement coordinator--family communication during the organ donation discussion.

    Science.gov (United States)

    Baughn, Daniel; Auerbach, Stephen M; Siminoff, Laura A

    2010-09-01

    Interpersonal relations with health care providers influence families' decisions to consent to solid-organ donation. However, previous research has been based on retrospective interviews with donation-eligible families and has not directly examined the interpersonal interactions between families and organ procurement coordinators. To increase understanding of the interpersonal interaction between procurement coordinators and families during the organ donation discussion, with special attention to the influence of the sex and race of the procurement coordinator and the race of the potential donor's family. A descriptive study in which standardized patients portrayed family members interacting with actual procurement coordinators in simulated donation request scenarios. Thirty-three videotaped interactions between standardized patients and 17 procurement coordinators involving 2 different scenarios depicting deceased donation were evaluated. Video recordings were rated by independent coders. Coders completed the Impact Message Inventory-Form C, the Participatory Style of Physician Scale, and the Siminoff Communication and Content and Affect Program-Global Observer Ratings scale. African American procurement coordinators, particularly African American women, were rated as more controlling and work-oriented than white procurement coordinators. Male procurement coordinators were more affiliative with the white family than the African American family, whereas female procurement coordinators were slightly less affiliative with the white family. African American procurement coordinators expressed more positive affect when interacting with the African American family than the white family, whereas the opposite was true for white procurement coordinators. Research is needed to cross-validate these exploratory findings and further examine cultural mistrust between procurement coordinators and families of ethnic minorities, especially given the negative attitudes of many

  2. Lives and choices, give and take: Altruism and organ procurement.

    Science.gov (United States)

    Thornton, Vicky

    2017-01-01

    In 2015, Wales introduced a deemed consent: soft opt-out system for organ procurement in order to address the chronic shortage of organs for transplant. Early statistical evidence suggests that this has had a positive impact on cadaveric organ donation. Such a system for procurement has previously been dismissed by the Organ Donation Taskforce, who suggested that opting out could potentially undermine the concept of donated organs as gifts and this could then negatively impact the number of organs offered for transplant. Considerable weight was placed upon the need to retain the altruistic gift element associated with an opt-in system. This article will consider the role of altruism in an organ procurement policy. A broad utilitarian approach will be taken when putting forward the arguments in favour of adopting a weak altruism position in a soft opt-out system for procurement with a combined registry.

  3. The Committed Changes Within Public Procurement Law in Turkey (2003-2014)

    OpenAIRE

    Mehmet Nar

    2015-01-01

    It is aimed to reach international standards at procurement of goods or services and works by the state with the law no. 4734 constituted for preventing mismanagement, waste and corruption in public procurements. However, activities and payments which are carried out within this extent are open fields for corruption. Thus, this situation enables law provisions and also the power of Public Procurement Authority (PPA) to be rearranged for the purposes of interest groups when necessary. So, our ...

  4. Procurement performance measurement system in the health care industry.

    Science.gov (United States)

    Kumar, Arun; Ozdamar, Linet; Ng, Chai Peng

    2005-01-01

    The rising operating cost of providing healthcare is of concern to health care providers. As such, measurement of procurement performance will enable competitive advantage and provide a framework for continuous improvement. The objective of this paper is to develop a procurement performance measurement system. The paper reviews the existing literature in procurement performance measurement to identify the key areas of purchasing performance. By studying the three components in the supply chain collectively with the resources, procedures and output, a model is been developed. Additionally, a balanced scorecard is proposed by establishing a set of generic measures and six perspectives. A case study conducted at the Singapore Hospital applies the conceptual model to describe the purchasing department and the activities within and outside the department. The results indicate that the material management department has already made a good start in measuring the procurement process through the implementation of the balanced scorecard. There are many data that are collected but not properly collated and utilized. Areas lacking measurement include cycle time of delivery, order processing time, effectiveness, efficiency and reliability. Though a lot of hard work was involved, the advantages of establishing a measurement system outweigh the costs and efforts involved in its implementation. Results of balanced scorecard measurements provide decision-makers with critical information on efficiency and effectiveness of the purchasing department's work. The measurement model developed could be used for any hospital procurement system.

  5. Green related practices for construction procurement

    Science.gov (United States)

    Bidin, Z. A.; Bohari, A. A. M.; Rais, S. L. A.; Saferi, M. M.

    2018-04-01

    Environment degradation issue has been a worldwide problem and various efforts have been done to minimise the problem. Construction sectors are pointed as one of the major contributors to its construction activities. Green-oriented procurement [GP] is considered as an environmental strategy to integrate the environmental practices into the construction delivery. Thus, this paper reviews the concept of GP and the practices related to it. The outcome of this research findings provides a basis for understanding the concept of GP and the further development of GP. The listed GP practices identified from this paper can serve as guidelines for industry practitioners to design, implement, and benchmarking the green practices in their procurement delivery.

  6. Buying green! A handbook on green energy procurement. 2nd edition

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-11-10

    Over 2 trillion Euros is spent on public contracts on a yearly basis in the EU, translating to 19 percent of its GDP. ICLEI has been working with the European Commission to produce guidance on green public procurement (GPP) which will help public authorities to reduce their environmental impact, while complying with the procurement rules. The result is the new edition of the Buying Green! handbook. The handbook identifies strategies for GPP, and explains in detail how these can be implemented at each stage of the procurement process. It is intended for public sector procurers but is also a useful reference for policy makers and businesses who are either implementing their own green purchasing or responding to tenders. In addition to explaining how GPP can be implemented under the EU procurement rules, the handbook includes examples of green contracts from across the EU-27. The resource has been fully updated from the previous 2004 edition and includes expanded sections on life-cycle costing (LCC) and the construction, timber, electricity and food and drink sectors.

  7. Use of commercial grade item dedication to reduce procurement costs

    International Nuclear Information System (INIS)

    Rosch, F.

    1995-01-01

    In the mid-1980s, the Nuclear Regulatory Industry (NRC) began inspecting utility practices of procuring and dedicating commercial grade items intended for plant safety-related applications. As a result of the industry efforts to address NRC concerns, nuclear utilities have enhanced existing programs and procedures for dedication of commercial grade items. Though these programs were originally enhanced to meet NRC concerns, utilities have discovered that the dedication of commercial grade items can also reduce overall procurement costs. This paper will discuss the enhancement of utility dedication programs and demonstrates how utilities have utilized them to reduce procurement costs

  8. Innovation, Procurement and Construction Industry Development

    Directory of Open Access Journals (Sweden)

    Geard de Valence

    2010-12-01

    Full Text Available The implications for analysis of innovation in construction of theoretical developments in industrial organisation are considered in this research, as an attempt to outline a new approach to construction innovation incorporating the ideas found in knowledge based, technology centred models. The paper firstly summarises characteristics of the construction industry, focusing on their effects on innovation, before surveying some of the ideas about the sources of innovation and the expansion and application of knowledge. Construction can be seen as an industry with limited scope for knowledge externalities, where the procurement methods used by the industry’s clients do not pay for innovation. The following discussion uses recent developments in the research on the economics of innovation and industrial organization theory, such as research intensity and the endogenous sunk costs in competitive, fragmented, low research intensity industries. The effects on R&D of procurement methods and on industry structure are discussed, with a focus on the appropriability of innovations and the role of the client on the Heathrow Terminal 5 project. The paper concludes that the procurement methods used for building and construction projects appears to be a determining factor in the level of innovation in the construction industry

  9. Promises and Pitfalls of Using Social Media in Public E-procurement: an Appraisal

    Directory of Open Access Journals (Sweden)

    Sharif As-Saber

    2014-11-01

    Full Text Available Social Media (SM, in recent years, is emerging as a common platform for low cost information exchange, and has attracted a critical mass of users both at corporate and retail levels. Theoretically, SM can thus be used as a tool to strengthen e-procurement in the public sector. Towards this end, we have prepared a conceptual model drawing on literature reviews and some examples while identifying a set of expected benefits and challenges within four stages of e-procurement. Using the framework, a case study has been conducted involving Australian public procurement initiatives and 15 federal government senior officials engaged in e-procurement. They have been interviewed to shed light on the possibilities and challenges of using SM in the public e-procurement context. The findings of the study suggest a limited scope for SM usage in the Australian public sector e-procurement process. The implications of the findings are discussed and some recommendations offered.

  10. Defense Primer: Procurement

    Science.gov (United States)

    2017-02-10

    Usually, incremental funding is used to mitigate peaks and valleys in annual budgets caused by the cost of one item significantly changing the...base defense budget . DOD uses these funds to buy several different types of materiel, including  new items easily recognizable as military...pursues a policy of full funding for procurement, meaning that the total estimated cost of each unit must be funded in the year it is budgeted . In a

  11. The Notice on the Notion of State Aid and Public Procurement Law

    DEFF Research Database (Denmark)

    Ølykke, Grith Skovgaard

    2016-01-01

    uncertainty. Then the elaborations made in the Notice on the notion of aid concerning the relation between the two areas of law are analysed and discussed, in particular, first, the question whether adhering to the procurement procedures laid down in the public procurement directives will eliminate the risk......The Commission Notice on the notion of State aid includes elaboration on the relationship between State aid law and public procurement law. To begin with, the article examines some of the reasons why the relationship between State aid law and public procurement law is surrounded by legal...... of granting State aid and, second, the issues rising from State aid control of in-house situations. It is concluded that even though the Notice on the notion of aid brings some needed clarity that fosters coherence between State aid law and public procurement law, the existing legal uncertainty is not even...

  12. Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress

    Science.gov (United States)

    2017-03-16

    approaches, see CRS Report RL31404, Defense Procurement: Full Funding Policy— Background, Issues, and Options for Congress, by Ronald O’Rourke and Stephen ...proposing  a multiyear procurement contract for FY2017-FY2021 for procuring UH-60M Black Hawk helicopters; and  a multiyear contract for FY2017-FY2021...as reported states: SEC. 112. Multiyear procurement authority for UH–60M and HH–60M Black Hawk helicopters. (a) Authority for multiyear procurement

  13. Ghana : Country Procurement Assessment Report, Volume 2. Main Report

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  14. Ghana : Country Procurement Assessment Report, Volume 5. Annex 9

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  15. Ghana : Country Procurement Assessment Report, Volume 1. Executive Summary

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  16. Ghana : Country Procurement Assessment Report, Volume 4. Annex 8

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  17. A procurement decision model for a video rental store — A case study

    African Journals Online (AJOL)

    predetermined budget. The procurement decision model is evaluated by means of predicting the expected turnover using the procurement decision model solution, and then comparing it to the turnover achieved using the procurement strategy followed by the store owner. The model is not prescriptive — the decision maker ...

  18. Exponential and power laws in public procurement markets

    Czech Academy of Sciences Publication Activity Database

    Krištoufek, Ladislav; Skuhrovec, J.

    2012-01-01

    Roč. 99, č. 2 (2012), 28005-1-28005-6 ISSN 0295-5075 R&D Projects: GA ČR GA402/09/0965 Grant - others:GA UK(CZ) 118310; SVV(CZ) 265 504; GA TA ČR(CZ) TD010133 Institutional support: RVO:67985556 Keywords : Public procurement * Scaling * Power law Subject RIV: AH - Economics Impact factor: 2.260, year: 2012 http://library.utia.cas.cz/separaty/2012/E/kristoufek-exponential and power laws in public procurement markets.pdf

  19. The government procurement agreement: Implications of economic theory

    OpenAIRE

    Mattoo, Aaditya

    1996-01-01

    This paper analyzes the provisions of the new Agreement on Government Procurement (GPA), drawing insights from trade theory and recent developments in the economics of information and law. A central conclusion is that in a world where imperfectly informed procurers purchase from imperfectly competitive firms on behalf of imperfectly informed tax-payers, it is not easy to devise rules which would be optimal in all situations. Nevertheless, the non-discriminatory provisions of the GPA seem to a...

  20. Sustainability requirements in EU public and private procurement – a right or an obligation

    DEFF Research Database (Denmark)

    Andrecka, Marta; Peterkova, Katerina

    2017-01-01

    procurement. This is true both for the public and private sectors. However, there is only limited legal regulation of sustainable procurement, which causes many uncertainties in respect to the possibility to include sustainability concerns into procurement processes as well as consequences of (not) doing so...... and private procurement and similarities and differences between the sectors are identified. We find that in both sectors sustainability topics (i) are increasingly considered and implemented into contracts; (ii) deal with similar issues in both contexts; (iii) cover issues that are linked to the subject....... Still, it is found that while there is a right to include sustainability considerations into both public and private procurement processes, there are only contours of the legal obligation to do so. In respect to private procurement, the right to give considerations to sustainability issues...

  1. Corruption and innovation in the Albanian public procurement system

    Directory of Open Access Journals (Sweden)

    Reida Kashta

    2014-07-01

    The question marks that this paper raises are: what are the means used in the war against corruption in the public procurement field in Albania? Did they had any real impact or they just reshaped the ways of doing corruption? The main finding of this paper is that introduction of e-procurement system was one of the most appropriate means to fight corruption in Albania, because this system fixed one of the biggest problems of the Albanian Public Procurement system; lack of transparency. The electronic system is transparent, since it provides the increasing of information passing through it, and the most important, it enhances the responsibility in relations between the contracting authorities and economic operators, enabling a more effective and efficient use of the tax payers’ money.

  2. Mechanism Design for Task Procurement with Flexible Quality of Service

    Science.gov (United States)

    Gerding, Enrico H.; Larson, Kate; Rogers, Alex; Jennings, Nicholas R.

    In this paper, we consider the problem where an agent wishes to complete a single computational task, but lacks the required resources. Instead, it must contract self-interested service providers, who are able to flexibly manipulate the quality of service they deliver, in order to maximise their own utility. We extend an existing model to allow for multiple such service providers to be contracted for the same task, and derive optimal task procurement mechanisms in the setting where the agent has full knowledge of the cost functions of these service providers (considering both simultaneous and sequential procurement). We then extend these results to the incomplete information setting where the agent must elicit cost information from the service providers, and we characterise a family of incentive-compatible and individually-rational mechanisms. We show empirically that sequential procurement always generates greater utility for the agent compared to simultaneous procurement, and that over a range of settings, contracting multiple providers is preferable to contracting just one.

  3. Controlling the quality of replacement parts in nuclear station, class 1E equipment

    International Nuclear Information System (INIS)

    Pierson, R.K.; Clemons, R.W.

    1984-01-01

    Nuclear station owners have traditionally purchased replacement parts for Class 1E equipment from the original supplier of the equipment. By this method, part and equipment quality could be maintained. In recent years, however, this traditional source of parts has continuously declined as an increasing number of original equipment suppliers stop producing Class 1E equipment or no longer stock parts for older equipment. When replacement parts for Class 1E equipment are not obtainable from the original suppliers, equipment owners have created a variety of methods for assuring the quality of parts obtained from other sources. A standard that provides direction and guidance for maintaining the quality of Class 1E equipment when repaired with parts from alternate sources is, therefore, needed to assure the methods in use are satisfactory and to alert the equipment owners to additional acceptable methods. The standard has now been proposed. IEEE Standard P934 (June, 1983 Draft): ''Requirements for Replacement Parts for Class 1E Equipment in Nuclear Power Generating Stations'' (Ref-3) consist of an introductory section followed by sections on part selection, procurement, replacement (including inspections and tests), non-conforming conditions and records. The proposed standard also includes a non-mandatory appendix on acceptable procurement methods and a summary intended to assist the user in selecting a proper procurement method

  4. Federal Procurement Data System - FPDS API

    Data.gov (United States)

    General Services Administration — The Federal Procurement Data System (FPDS) Next Generation has been re-engineered as a real-time federal enterprise information system. Web services based on SOAP...

  5. 78 FR 38953 - Procurement List Additions

    Science.gov (United States)

    2013-06-28

    ... Blind or Severely Disabled published notices of proposed additions to the Procurement List. After... Punch, Paper, Desktop, 3-Hole, Adjustable, 11 sheet capacity, Metallic Base, Black Grip. Coverage: A...

  6. 78 FR 12295 - Procurement List; Additions

    Science.gov (United States)

    2013-02-22

    ... published notices of proposed additions to the Procurement List. After consideration of the material..., 508 Compliant, 12 Digit, Portable, Desktop, Battery Operated NPA: MidWest Enterprises for the Blind...

  7. 48 CFR 504.602-71 - Federal Procurement Data System-Public access to data.

    Science.gov (United States)

    2010-10-01

    ... Government procurement to the public. (b) Fee for direct hook-up. To the extent that a member of the public... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Federal Procurement Data... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration...

  8. Lung Focused Resuscitation at a Specialized Donor Care Facility Improves Lung Procurement Rates.

    Science.gov (United States)

    Chang, Stephanie H; Kreisel, Daniel; Marklin, Gary F; Cook, Lindsey; Hachem, Ramsey; Kozower, Benjamin D; Balsara, Keki R; Bell, Jennifer M; Frederiksen, Christine; Meyers, Bryan F; Patterson, G Alexander; Puri, Varun

    2018-05-01

    Lung procurement for transplantation occurs in approximately 20% of brain dead donors and is a major impediment to wider application of lung transplantation. We investigated the effect of lung protective management at a specialized donor care facility on lung procurement rates from brain dead donors. Our local organ procurement organization instituted a protocol of lung protective management at a freestanding specialized donor care facility in 2008. Brain dead donors from 2001 to 2007 (early period) were compared with those from 2009 to 2016 (current period) for lung procurement rates and other solid-organ procurement rates using a prospectively maintained database. An overall increase occurred in the number of brain dead donors during the study period (early group, 791; late group, 1,333; p procurement rate (lung donors/all brain dead donors) improved markedly after the introduction of lung protective management (early group, 157 of 791 [19.8%]; current group, 452 of 1,333 [33.9%]; p procurement rate (total number of organs procured/donor) also increased during the study period (early group, 3.5 organs/donor; current group, 3.8 organs/donor; p = 0.006). Lung protective management in brain dead donors at a specialized donor care facility is associated with higher lung utilization rates compared with conventional management. This strategy does not adversely affect the utilization of other organs in a multiorgan donor. Copyright © 2018 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  9. 32 CFR 507.17 - Procurement and wear of heraldic items.

    Science.gov (United States)

    2010-07-01

    ... controlled heraldic items, when authorized by local procurement procedures, may forward a sample insignia to... 32 National Defense 3 2010-07-01 2010-07-01 true Procurement and wear of heraldic items. 507.17... AUTHORITIES AND PUBLIC RELATIONS MANUFACTURE AND SALE OF DECORATIONS, MEDALS, BADGES, INSIGNIA, COMMERCIAL USE...

  10. Integration of public procurement data using linked data

    Directory of Open Access Journals (Sweden)

    Jindrich Mynarz

    2014-10-01

    Full Text Available Linked data is frequently casted as a technology for performing integration of distributed datasets on the Web. In this paper, we propose a generic workflow for data integration based on linked data and semantic web technologies. The workflow comes out of an analysis of the application of linked data to integration of public procurement data. It organizes common data integration tasks, including schema alignment, data translation, entity reconciliation, and data fusion, into a sequence of repeatable steps towards achieving a unified view of the combined datasets. We propose this workflow with the main goal of improving the usability of data and its value for data analyses. Specifically, we target the domain of public procurement and its characteristic challenges this application area poses to data integration. As the paper progresses through the individual steps of the integration workflow, it highlights the key concerns and proposes solutions based on linked data to address these concerns. The discussed data integration methods are illustrated and evaluated on a running example describing integration of public procurement data from the Czech Republic. Using a motivating example of an analytical query on public procurement data we demonstrate how data integration enables to reveal a likely case of clientelism between a contracting authority and its supplier, which is validated by previous coverage in the media.

  11. Public Procurement as One of the Institutions of New Industrial Policy

    OpenAIRE

    Elena F. Gutselyuk

    2018-01-01

    The article shows the role of public procurement in the formation of the new economic policy. It is proved that the public procurement market is a source of in-vestment in the economy. Analyzed the role of certain prohibitions and restrictions on a policy of import substitution. The application of national treatment to limit the turnover of foreign products was used in the 19th century and is widely used in modern industrial policy, especially in the procurement of goods through the state and...

  12. 40 CFR 30.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... competition when competitive bids or offers are not obtained; and basis for award cost or price. ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 30.46...

  13. Sustainable Public Procurement: Realization of the Social Aspect in Republic of Lithuania

    OpenAIRE

    Tvaronavičienė, Agnė; Kanapinskas, Virginijus; Plytnikas, Žydrūnas

    2014-01-01

    Public procurement concentrates large public sector’s purchasing power, and has a significant impact on each country’s economic development. The purpose of public procurement procedure is transparency, non-discrimination and accordance to the principles of fair competition in acquisition of goods, services and works necessary for the smooth functioning of the public administration. Besides, public procurement can be one of the most important instruments for sustainable development and other p...

  14. Effects of procurement on project performance:a survey of Swedish construction clients

    OpenAIRE

    Eriksson, Per-Erik; Vennström, Anders

    2009-01-01

    In order to increase the efficiency of the construction industry development and improvement of procurement procedures is vital. The purpose of this investigation is to increase the understanding of how procurement procedures affect project performance. A procurement model including eight hypotheses is first developed on the basis of a literature review and then tested through multivariate statistical techniques based on empirical data collected through a survey investigation of 106 Swedish c...

  15. Donor conversion and procurement failure: the fate of our potential organ donors.

    Science.gov (United States)

    Branco, Bernardino C; Inaba, Kenji; Lam, Lydia; Salim, Ali; Barmparas, Galinos; Teixeira, Pedro G R; Talving, Peep; Demetriades, Demetrios

    2011-02-01

    Donor availability remains the primary limiting factor for organ transplantation today. The purpose of this study was to examine the causes of procurement failure amongst potential organ donors. After Institutional Review Board approval, all surgical intensive care unit (SICU) patients admitted to the LAC+USC Medical Center from 01/2006 to 12/2008 who became potential organ donors were identified. Demographics, clinical data, and procurement data were abstracted. In non-donors, the causes of procurement failure were documented. During the 3-year study period, a total of 254 patients were evaluated for organ donation. Mean age was 44.8±18.7 years; 191 (75.2%) were male, 136 (53.5%) were Hispanic, and 148 (58.3%) were trauma patients. Of the 254 patients, 116 (45.7%) were not eligible for donation: 34 had multi-system organ failure, 24 did not progress to brain death and had support withdrawn, 18 had uncontrolled sepsis, 15 had malignancy, 6 had human immunodeficiency virus or hepatitis B or C, and 19 patients had other contraindications to organ donation. Of the remaining 138 eligible patients, 83 (60.2%) did not donate: 56 because the family denied consent, 9 by their own choice. In six, next of kin could not be located, five died because of hemodynamic instability before organ procurement was possible, four had organs that could not be placed, and three had their organs declined by the organ procurement organization. The overall consent rate was 57.5% (n=67). From the 55 donors, 255 organs were procured (yield 4.6 organs/donor). Of all patients screened for organ donation, only a fifth actually donated. Denial of consent was the major potentially preventable cause of procurement failure, whereas hemodynamic instability accounted for only a small percentage of donor losses. With such low conversion rates, the preventable causes of procurement failure warrant further study.

  16. 41 CFR 101-27.206 - Procurement of shelf-life materials.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of shelf-life materials. 101-27.206 Section 101-27.206 Public Contracts and Property Management Federal Property... MANAGEMENT 27.2-Management of Shelf-Life Materials § 101-27.206 Procurement of shelf-life materials. ...

  17. 48 CFR 225.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Science.gov (United States)

    2010-10-01

    ... Government Procurement Agreement and Free Trade Agreements. 225.403 Section 225.403 Federal Acquisition... FOREIGN ACQUISITION Trade Agreements 225.403 World Trade Organization Government Procurement Agreement and... Government Procurement Agreement, acquire only U.S.-made, qualifying country, or designated country end...

  18. 14 CFR 1260.146 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.146... of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  19. 7 CFR 3019.46 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ...) Justification for lack of competition bids or offers are not obtained, and (c) Basis for award cost or price. ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement...

  20. FAKTOR-FAKTOR YANG MEMENGARUHI PROCUREMENT FRAUD: SEBUAH KAJIAN DARI PERSPEKTIF PERSEPSIAN AUDITOR EKSTERNAL

    Directory of Open Access Journals (Sweden)

    Zulaikha Zulaikha

    2016-12-01

    Full Text Available This study examines factors affecting fraud in the procurement of government’s goods and services from the independent auditor’s point of view. Based on fraud triangles and theory of planned behavior, this study proposes seven hypotheses which were tested using structural equation model (SEM-partial least square. This study used primary data gathered by survey to auditors of Audit Board of the Republic of Indonesia in its head office and several selected representative offices. Respondents were asked to provide their answer/perception for questions in questionnaire regarding factors influencing the procurement fraud of government’s goods and services. The results show that the procurement frauds are significantly influenced by weaknesses in procurement system, lack of procurement committee's quality, and the intention to engage fraud. Furthermore, the intention to engage fraud are influenced by attitude, subjective norms, and the perceived behavioral control. These findings suggest that procurement frauds are associated with individual factors as rationalization and opportunities. These factors could be considered when designing internal control structure to restrain fraud behavior.

  1. Competitive Procurement and Asset Specificity

    NARCIS (Netherlands)

    Sorana, V.

    2003-01-01

    This paper studies the effects of asset specificity on the performance of procurement auctions with subcontracting and asset sales.The analysis highlights the role of several asset features like transfer costs, type of alternative uses and maintenance requirements.It is argued that, if bargaining

  2. 20 CFR 627.420 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... sources, unless it is demonstrated that the JTPA-funded alternative services or facilities would be more...) Each State and subrecipient shall conduct procurements in a manner which provides full and open... pricing practices between firms or organizations or between affiliated companies or organizations; (iv...

  3. 45 CFR 2541.360 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... foster greater economy and efficiency, grantees and subgrantees are encouraged to enter into State and... procured, and when necessary, shall set forth those minimum essential characteristics and standards to... grantee or subgrantee desires to have the review accomplished after a solicitation has been developed, the...

  4. Procurement selection criteria for projects in the public sector: evidence from Nigeria

    Directory of Open Access Journals (Sweden)

    Richard Ajayi Jimoh

    2016-12-01

    Full Text Available The selection of suitable procurement practice for construction projects is a very complex and demanding tasks for stakeholders in the construction industry. In spite of the overabundance of techniques and tools accessible to the stakeholders in selecting an appropriate procurement method, clients are faced with the decision as to which of the selection criteria can be adopted for a given construction project to achieve project goals and objectives. This paper focused on evaluating the existing procurement methods being practised in the Nigerian construction industry with a view to identifying and establishing the parameters for selection that will improve contract delivery systems. In this research, quantitative approach was used to collect data from 420 contractors, consultants and clients based in the Federal Capital Territory, Abuja where large numbers of building projects are being procured. The findings revealed six most commonly considered criteria and deduced that, the quality, cost and duration of the project determines the type of procurement method to adopt. It is therefore stated that in selecting any particular procurement method for building construction projects, the complexity of such project should be clearly defined and the other performance indicators be given adequate consideration for a successful project delivery that will enhance the achievement of the client’s goal.

  5. What Canada could learn from U.S. defence procurement: Issues, best practices and recommendations

    Directory of Open Access Journals (Sweden)

    Anessa L. Kimball

    2015-04-01

    Full Text Available Despite differences in scale, Canada and the U.S. face common challenges in military procurement and there is much Canada can learn as both countries pursue reforms. The U.S. employs a system of systems approach, based on requirements, resource allocation and acquisition. The process begins with the Joint Capabilities and Development System, focused on identifying and prioritizing needs and assessing alternatives. This is followed by the Planning, Programming, Budgeting and Execution System, which leads to the creation of a budget and provides guidance for the project’s execution. The third and final step is the Defense Acquisition System, which oversees the development and purchase of the new equipment. While deceptively simple in summary, U.S. defence procurement is dogged by problems — particularly cost overruns, a surfeit of key players and delayed schedules which degrade troops’ performance in the field. Additionally, the defence products market is restricted, inevitably limiting competition, encouraging misbehaviour on the part of business and driving up prices. The DoD is in the midst of consultations with contractors and Congress is undertaking an effort to rewrite acquisition laws. But the most pressing questions remain: Does a best procurement practice exist? If so, what criteria define it? In light of Canada’s new Defence Procurement Strategy (DPS, some lessons are clear. Further analysis is needed to figure out whether reforms can succeed in so narrow a marketplace. More attention must be paid to shaping contracts and clarifying expectations about sticking to schedules. And Ottawa must think carefully about the military’s needs, as it pushes ahead with the DPS. In surveying change at the DoD, this brief draws pointed conclusions to which Canada’s defence planners must pay heed, if they’re to leave the military stronger than they found it.

  6. Industry Analysis for Body Armor Procurement

    National Research Council Canada - National Science Library

    Foust, Coleen; Jenson, Christopher

    2006-01-01

    .... In addition, the Office of Management and Budget has required that each agency create strategic sourcing initiatives, monitor the cost savings and report the results to the Office of Federal Procurement Policy...

  7. MONITORING OF THE ACTIVITY OF PUBLIC PROCUREMENT SYSTEM IN COUNTRIES OF EUROPEAN UNION AND UKRAINE

    Directory of Open Access Journals (Sweden)

    Iryna Ksonzhyk

    2017-12-01

    Full Text Available The research objective is to study and summarize the experience of the European Union countries in the field of public procurement monitoring; to study the activities that form its mechanism; to analyse forms of monitoring. Also, the current state, problems and prospects of creation and implementation of the mechanism for public procurement monitoring in Ukraine are studied; administrative and corruption risks are revealed. Methodology. Theoretical and methodological backgrounds of the research are formed on the basis of the provisions, categories, and concepts of economic theory, national and world economy, strategic development of public procurement, modelling. Laws and regulations that are regulators of the public procurement system and its monitoring, the works of domestic and foreign scientists on investigated issues were of greater importance. The system-structural analysis and synthesis, general scientific methods and methods of economic research are used to analyse and evaluate the phenomena and processes that accompany the functioning of the public procurement market and the mechanism for its monitoring. In particular, historical and dialectical methods (when studying the development of public procurement system in Western countries, the definition of stages and trends in its formation, the development and adoption of treaties for the regulation of public procurement within the European Union; method of expert assessments (for assessing the regulatory and legal support for public procurement monitoring; abstractlogical method (when establishing the factors for the formation of a monitoring mechanism in the field of public procurement in Ukraine, in particular, the institutional and organizational-economic features of its implementation, when assessing the criteria and performance indicators for the functioning of the monitoring system and its impact on the public procurement market, for theoretical generalization and conclusions

  8. 78 FR 76700 - Procurement Thresholds for Implementation of the Trade Agreements Act of 1979

    Science.gov (United States)

    2013-12-18

    ... International Procurement Policy, Office of the United States Trade Representative, (202) 395-9646 or scott... the World Trade Organization (WTO) Agreement on Government Procurement, Chapter 15 of the United... OFFICE OF THE UNITED STATES TRADE REPRESENTATIVE Procurement Thresholds for Implementation of the...

  9. Legal Guarantees of Economic Competition in the European Union Public Procurement Regulation

    Directory of Open Access Journals (Sweden)

    E. Kosiński

    2017-01-01

    Full Text Available Purpose: the purpose of this publication is to assess legal guaranties of competition (free competition between contractors in broadly perceived process of granting public procurement, which means not only entering into a contract subject to the specific legal regime, concluded by a public purchaser, or possible private purchaser subordinated to that legal regime, with a contractor (contractors in order to satisfy its demand for certain goods or services, but also a due course of the whole process of granting public procurement, perceived as a sequence of factual and legal actions beginning with the moment of public announcement of a procurement, sending an invitation for submitting offers or sending invitation to negotiate for selection of an offer of a given contractor, up till final fulfilment of all obligations of the parties under the public procurement contract. Methods: the major research method is the dogmatic-legal method, namely an analysis of legal text of different laws. Moreover, there is a critical analysis of scholar literature. The most important in this context is to indicate mutual co-relations between competition and fair competition in area of public procurement system and to point other major principles of the public procurement process, such as non-discrimination rule, transparency, impartiality and objectiveness rule, legality rule, openness, rule of written form, primate of using tender mode (competitive mode, in another words it is a rule of extraordinary application of non-competitive modes or primate of granting public procurement in a tender mode. All of those rules constitute together components of the guarantee of genuine competition within the whole process of granting a public procurement. It must be stressed that the literature in the area of research in not really rich. This is accurate in terms of Polish literature and EU literature, too. Results. Conclusions and relevance: results of the research are such

  10. Institutional and Organizational Structure of the Federal Procurement System of the United States

    Directory of Open Access Journals (Sweden)

    Vovchenko Natalya Gennadyevna

    2015-09-01

    Full Text Available The paper deals with the role of the Federal procurement system of the United States as a regulatory tool of the U.S. economy. The scope of research is focused on organizational and institutional aspects of forming and developing the U.S. Federal procurement system. The main purpose of the paper is to study up-to-date mechanism of government acquisition in the United States and to consider all its structural elements taken in conjunction with each other, such as the President, the Office of Management and Budget (OMB, the Office of Federal Procurement Policy (OFPP, the General Services Administration (GSA, other executive and regulatory agencies. The methodological background of the research is based on normative, system-wide, statistical and complex approaches to the study of structural elements of the U.S. Federal procurement system. The theoretical and practical material of the present research can be used in teaching and learning activities at economic faculties, for instance, in the course of lectures on government contacting and public procurement management. It also can be used in training and advanced training of specialists who draft public procurement regulations in the Russian Federation. The statutory regulation of the U.S. Federal procurement system constitutes an organizational framework of executive agencies, their functions and responsibilities, specifics of government control over contract performance, competition requirements and contracting methods. The paper considered interrelated components of the U.S. Federal procurement system, which operates in furtherance of efficient utilization of Federal budget.

  11. Procurement Practices for the Composite Armored Vehicle and Composite Affordability Initiative Programs

    National Research Council Canada - National Science Library

    Granetto, Paul

    1999-01-01

    The audit objective was to determine whether violations of procurement regulations occurred regarding procurement of selected components of the Army Crusader vehicle and the Joint Strike Fighter aircraft...

  12. Persepsi Pengguna Layanan Pengadaan Barang dan Jasa pada Pemerintah Kota Yogyakarta terhadap Implementasi Sistem E Procurement

    Directory of Open Access Journals (Sweden)

    Ita Akyuna Nightisabha

    2011-03-01

    Full Text Available This study aims to evaluate the implementation of electronic procurement of goods and services by the Government City of Yogyakarta, as an effort to create good governance especially in terms of procurement. This study compares the perceptions of user that consist of procurement committee and the providers of goods and services. Research location is in Layanan Pengadaan Secara Elektronik (LPSE of Government City of Yogyakarta as a system developer with the sample of the procurement committee and partner of goods and services that are spread in Yogyakarta and surrounding areas. This research uses t-test by using a reference measurement system on the success of end-user computing satisfaction developed by Torzadeh and Doll (1991. The results show a difference of perception between the committee and the procurement of goods and services providers to the implementation of e-proc system. There is difference in perception between users of e-procurement supplier of goods / services and the procurement committee. Implementation of e-procurement system is being run by the Government City of Yogyakarta is currently has not been relatively applied, because the technology gap that has led to the differences in perception between the committee and the procurement of goods and services providers.Keywords: good governance, e-procurement, perception

  13. A procurement decision support mechanism on multi-attribute fuzzy-interval auctions

    DEFF Research Database (Denmark)

    Franco de los Ríos, Camilo; Hougaard, Jens Leth; Nielsen, Kurt

    2016-01-01

    Procurement systems are the basis for assuring efficiency and fairness in organizations. Consequently, the development of procurement systems faces an ongoing challenge in designing trading systems that facilitate transparent competition on both price and multiple attributes, as well as ensuring...

  14. 7 CFR 2.93 - Director, Office of Procurement and Property Management.

    Science.gov (United States)

    2010-01-01

    ... acquisition and procurement, real and personal property management, waste prevention and resource recycling... Leadership in Environmental Management. (v) Coordinate USDA waste prevention, recycling, and procurement... equipment of the Department for the purpose of distribution to cities, towns, or local government entities...

  15. Woodfuel procurement strategies of district heating plants

    International Nuclear Information System (INIS)

    Roos, A.; Bohlin, F.; Hektor, B.; Hillring, B.

    2003-01-01

    Woodfuel use in the Swedish district heating sector increased significantly from 1985 to 1999. This study analysed strategies and considerations concerning woodfuel procurement in district heating plants. Priorities and concerns in the industry involved an increased woodfuel share, ambitions to create an environmental image, cost minimisation, awareness about the role of energy policies for fuel choice, improvement of woodfuel quality and the ambition to maintain a competitive woodfuel market with several suppliers. Factor analysis yielded five dimensions in the woodfuel procurement strategies among the district heating companies: (1) increased woodfuel use; (2) import; (3) spot market woodfuel purchases; (4) focus on refined woodfuels; and (5) using price only when deciding whether to use woodfuels or other fuels. Five clusters were defined along the three strategy dimensions (1)-(3). The clusters differed concerning size, experiences from the introduction of woodfuels, perceptions about woodfuels and strategies employed to date. This paper describes different strategies that the district heating companies apply on the woodfuel market. The conclusion is that policies should consider this diversity in procurement strategies, mitigate their negative side-effects and assist to make them cost-effective. (author)

  16. Efisiensi Sistem E-procurement dalam Pelelangan Umum Pengadaan Barang dan Jasa (Studi Kasus: Dinas Pekerjaan Umum Provinsi Bali)

    OpenAIRE

    Claudy, Fransiskus; Noak, Piers Andreas; Winaya, I Ketut

    2017-01-01

    E-procurement system in the procurement of government goods / services is essential to improve the efficiency of the procurement process, this is the purpose and principles of procurement process government goods / services, including the Public Works Department of Bali Province as one SKPD Bali Province who have used the e-procurement system in the procurement process. The purpose of this study was to determine the efficiency as well as the constraints of e-procurement system in the procurem...

  17. Flexible Procurement of Services with Uncertain Durations using Redundancy

    OpenAIRE

    Stein, S; Gerding, E; Rogers, A; Larson, K; Jennings, NR

    2009-01-01

    Emerging service-oriented technologies allow software agents to automatically procure distributed services to complete complex tasks. However, in many application scenarios, service providers demand financial remuneration, execution times are uncertain and consumers have deadlines for their tasks. In this paper, we address these issues by developing a novel approach that dynamically procures multiple, redundant services over time, in order to ensure success by the deadline. Specifically, we f...

  18. 36 CFR 1210.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards...) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  19. 2 CFR 215.46 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... NON-PROFIT ORGANIZATIONS (OMB CIRCULAR A-110) Post Award Requirements Procurement Standards § 215.46... of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  20. 48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Science.gov (United States)

    2010-10-01

    ... Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition... 25.403 World Trade Organization Government Procurement Agreement and Free Trade Agreements. (a... in 25.402(a)(1). The WTO GPA and FTAs specify procurement procedures designed to ensure fairness (see...

  1. Level of satisfaction and issues with procurement systems used in the Malaysian public sector

    Directory of Open Access Journals (Sweden)

    Mastura Jaafar

    2013-03-01

    Full Text Available Since the declaration of Malaysian independence, the public sector has significantly contributed to the country’s development. In the 1990s, a new procurement system was developed due to CIBD various changes in the construction industry. Since that period, the poor quality of public sector projects has started to attract public attention. This paper describes a study that was conducted to identify the dominant public procurement systems in place, the problems associated with these systems, and the satisfaction level of the industry players in the Malaysian construction industry. The results were drawn from 84 survey responses and interviews with industry players. The public sector is using a traditional system inherited from the British, with an intention to adopt new procurement systems. Aside from the disputes that are present in most systems, the public sector seems to encounter particular problems in relation to capabilities, time, and cost of the major procurement systems used. Traditional work culture and the industry environment influence public sector practice, which accounts for the modifications of each procurement system used. Thus, the full advantages of using an alternative procurement system may not be realised in public sector organizations. This produces an average level of satisfaction gained from the procurement system adopted. As a developing country, Malaysia needs to exert significant efforts to improve the public procurement system. 

  2. Level of satisfaction and issues with procurement systems used in the Malaysian public sector

    Directory of Open Access Journals (Sweden)

    Mastura Jaafar

    2013-03-01

    Full Text Available Since the declaration of Malaysian independence, the public sector has significantly contributed to the country’s development. In the 1990s, a new procurement system was developed due to CIBD various changes in the construction industry. Since that period, the poor quality of public sector projects has started to attract public attention. This paper describes a study that was conducted to identify the dominant public procurement systems in place, the problems associated with these systems, and the satisfaction level of the industry players in the Malaysian construction industry. The results were drawn from 84 survey responses and interviews with industry players. The public sector is using a traditional system inherited from the British, with an intention to adopt new procurement systems. Aside from the disputes that are present in most systems, the public sector seems to encounter particular problems in relation to capabilities, time, and cost of the major procurement systems used. Traditional work culture and the industry environment influence public sector practice, which accounts for the modifications of each procurement system used. Thus, the full advantages of using an alternative procurement system may not be realised in public sector organizations. This produces an average level of satisfaction gained from the procurement system adopted. As a developing country, Malaysia needs to exert significant efforts to improve the public procurement system.

  3. 20 CFR 437.36 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... greater economy and efficiency, grantees and subgrantees are encouraged to enter into State and local... procured, and when necessary, must set forth those minimum essential characteristics and standards to which... desires to have the review accomplished after a solicitation has been developed, SSA may still review the...

  4. The Determinants of the Compliance to Public Procurement Policy Requirements among Public Enterprises in Zimbabwe

    Directory of Open Access Journals (Sweden)

    Maxwell Sandada

    2016-09-01

    Full Text Available Many public entities in Zimbabwe are operating in a very volatile environment characterised by public procurement systems open to abuse. Zimbabwe is one of the first countries in Africa to have a Procurement Act however non-compliance issues are still a challenge. Public procurement scandals have been a hot topic with the media and also with the Report of the Auditor General for the financial year ended December 31, 2014 having picked on a lot of issues relating to non-compliance with procurement regulations in a number of public enterprises. The purpose of the study was to assess the influence selected factors (enforcement, professionalism, political interferences, familiarity with Procurement Act regulations and ethics on compliance to procurement regulations within the public entities. A quantitative survey research approach was used to collect data from 144 public procurement professionals in public entities in Harare, Zimbabwe. SPSS software version 21 was used to process the data that were later analysed through correlation and regression analyses. Familiarity with procurement regulations, enforcement and political interference were found to be statistically significant predictors of compliance. The managerial implications and direction for future research are provided.

  5. Procurement Sustainability Tensions

    DEFF Research Database (Denmark)

    Fayezi, Sajad; Zomorrodi, Maryam; Bals, Lydia

    2018-01-01

    as stakeholder and institutional theory. Design/methodology/approach: The authors use a multiple case study approach. Data are collected through multiple interviews and archival data from eight case companies in Australia. Findings: The authors identify supply chain and company procurement sustainability...... of institutional distance, can characterize the manifestation of PSTs. Practical implications: The findings are instrumental for managers to make informed decisions when dealing with PSTs, and they pave the way for paradoxical leadership given the increasing importance of simultaneous development and balancing...

  6. Contractual stability and its relationship with the political process of law-making: An analysis of Peru’s public procurement and the principles of the Agreement on Government Procurement with the World Trade Organization

    OpenAIRE

    Zegarra Pinto, José; Peche Loayza, Luwing

    2017-01-01

    This paper develops an analysis of the impacts of the Agreement on Government Procurement (GPA) Principles and Rules on the Peruvian Public Procurement regulation, and Peruvian participation in the process of international standardisation of public procurement through signing different kinds of free trade agreements (FTAs).

  7. 32 CFR 32.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 32.46... for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  8. 22 CFR 145.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... for lack of competition when competitive bids or offers are not obtained, and (c) basis for award cost or price. ...

  9. 24 CFR 84.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  10. Medicine procurement in hospital pharmacies of Nepal: A qualitative study based on the Basel Statements

    Science.gov (United States)

    Ranjit, Eurek

    2018-01-01

    Background Accessibility and affordability of evidence-based medicines are issues of global concern. For low-income countries like Nepal, it is crucial to have easy and reliable access to affordable, good-quality, evidence-based medicines, especially in the aftermath of natural or manmade disasters. Availability of affordable and evidence-based high quality medicines depends on the medicine procurement procedure, which makes it an important aspect of healthcare delivery. In this study, we aimed to investigate medicine procurement practices in hospital pharmacies of Nepal within the framework of International Pharmaceutical Federation [FIP] hospital pharmacy guidelines “the Basel Statements”. Method We conducted semi-structured interviews with hospital pharmacists or procurement officers in hospital pharmacies of four major regions in Nepal to explore procurement practices. Data were collected until saturation of themes, analysed using the framework approach, and organised around the statements within the procurement theme of the Basel Statements. Results Interviews conducted with 53 participants revealed that the procurement guidelines of the Basel Statements were adopted to a certain extent in hospital pharmacies of Nepal. It was found that the majority of hospital pharmacies in Nepal reported using an expensive direct-procurement model for purchasing medicines. Most had no formulary and procured medicines solely based on doctors’ prescriptions, which were heavily influenced by pharmaceutical companies’ marketing strategies. Whilst most procured only registered medicines, a minority reported purchasing unregistered medicines through unauthorised supply-chains. And although the majority of hospital pharmacies had some contingency plans for managing medicine shortages, a few had none. Conclusions Procurement guidelines of the Basel Statements were thus found to be partially adopted; however, there is room for improvement in current procurement practices in

  11. Medicine procurement in hospital pharmacies of Nepal: A qualitative study based on the Basel Statements.

    Science.gov (United States)

    Shrestha, Mina; Moles, Rebekah; Ranjit, Eurek; Chaar, Betty

    2018-01-01

    Accessibility and affordability of evidence-based medicines are issues of global concern. For low-income countries like Nepal, it is crucial to have easy and reliable access to affordable, good-quality, evidence-based medicines, especially in the aftermath of natural or manmade disasters. Availability of affordable and evidence-based high quality medicines depends on the medicine procurement procedure, which makes it an important aspect of healthcare delivery. In this study, we aimed to investigate medicine procurement practices in hospital pharmacies of Nepal within the framework of International Pharmaceutical Federation [FIP] hospital pharmacy guidelines "the Basel Statements". We conducted semi-structured interviews with hospital pharmacists or procurement officers in hospital pharmacies of four major regions in Nepal to explore procurement practices. Data were collected until saturation of themes, analysed using the framework approach, and organised around the statements within the procurement theme of the Basel Statements. Interviews conducted with 53 participants revealed that the procurement guidelines of the Basel Statements were adopted to a certain extent in hospital pharmacies of Nepal. It was found that the majority of hospital pharmacies in Nepal reported using an expensive direct-procurement model for purchasing medicines. Most had no formulary and procured medicines solely based on doctors' prescriptions, which were heavily influenced by pharmaceutical companies' marketing strategies. Whilst most procured only registered medicines, a minority reported purchasing unregistered medicines through unauthorised supply-chains. And although the majority of hospital pharmacies had some contingency plans for managing medicine shortages, a few had none. Procurement guidelines of the Basel Statements were thus found to be partially adopted; however, there is room for improvement in current procurement practices in hospital pharmacies of Nepal. Adoption and

  12. Medicine procurement in hospital pharmacies of Nepal: A qualitative study based on the Basel Statements.

    Directory of Open Access Journals (Sweden)

    Mina Shrestha

    Full Text Available Accessibility and affordability of evidence-based medicines are issues of global concern. For low-income countries like Nepal, it is crucial to have easy and reliable access to affordable, good-quality, evidence-based medicines, especially in the aftermath of natural or manmade disasters. Availability of affordable and evidence-based high quality medicines depends on the medicine procurement procedure, which makes it an important aspect of healthcare delivery. In this study, we aimed to investigate medicine procurement practices in hospital pharmacies of Nepal within the framework of International Pharmaceutical Federation [FIP] hospital pharmacy guidelines "the Basel Statements".We conducted semi-structured interviews with hospital pharmacists or procurement officers in hospital pharmacies of four major regions in Nepal to explore procurement practices. Data were collected until saturation of themes, analysed using the framework approach, and organised around the statements within the procurement theme of the Basel Statements.Interviews conducted with 53 participants revealed that the procurement guidelines of the Basel Statements were adopted to a certain extent in hospital pharmacies of Nepal. It was found that the majority of hospital pharmacies in Nepal reported using an expensive direct-procurement model for purchasing medicines. Most had no formulary and procured medicines solely based on doctors' prescriptions, which were heavily influenced by pharmaceutical companies' marketing strategies. Whilst most procured only registered medicines, a minority reported purchasing unregistered medicines through unauthorised supply-chains. And although the majority of hospital pharmacies had some contingency plans for managing medicine shortages, a few had none.Procurement guidelines of the Basel Statements were thus found to be partially adopted; however, there is room for improvement in current procurement practices in hospital pharmacies of Nepal

  13. Electricity procurement for large consumers based on Information Gap Decision Theory

    International Nuclear Information System (INIS)

    Zare, Kazem; Moghaddam, Mohsen Parsa; Sheikh El Eslami, Mohammad Kazem

    2010-01-01

    In the competitive electricity market, consumers seek strategies to meet their electricity needs at minimum cost and risk. This paper provides a technique based on Information Gap Decision Theory (IGDT) to assess different procurement strategies for large consumers. Supply sources include bilateral contracts, a limited self-generating facility, and the pool. It is considered that the pool price is uncertain and its volatility around the estimated value is modeled using an IGDT model. The proposed method does not minimize the procurement cost but assesses the risk aversion or risk-taking nature of some procurement strategies with regard to the minimum cost. Using this method, the robustness of experiencing costs higher than the expected one is optimized and the related strategy is determined. The proposed method deals with optimizing the opportunities to take advantage of low procurement costs or low pool prices. A case study is used to illustrate the proposed technique.

  14. Legal aspects of Joint Pre-Commercial Procurements: from modeling to implementation

    CERN Document Server

    CERN. Geneva

    2015-01-01

    The delivery of Information and Communication Technology (ICT) services is changing fundamentally. Cloud-based services are replacing traditional local - or on-premises - software and infrastructure installations for many public sector organisations. This applies to government but also to public research organisations, including libraries, which currently deal with the outburst of big data and the need for additional computing capacity. While technology service options continue to evolve, procurement processes and policies have remained firmly rooted in historical practices that are no longer effective. In order for public research organisations of all sizes to take advantage of the best solutions the market has to offer nowadays, a more flexible and agile procurement process must be created and implemented. The objective of this presentation is to review strategies and tips in order to help procurers implement and publish a Joint Pre-Commercial Procurement tender; including: General legal framework of PC...

  15. Statistical Studies of Non-price Competition in the Structure of Public Procurement in the Russian Federation

    OpenAIRE

    Svetlana Aleksandrovna Sergeeva; Alexander Alexandrovich Arionchik

    2016-01-01

    The principle of securing competition is one of the basic principles of the contract system in public procurement in the Russian Federation. The law on the contract system in procurement stipulates that the contract system in procurement is aimed at creating equal conditions to ensure competition between the parties to procurement. An important aspect is that the competition for procurement should be based on compliance with the principle of fair price and non-price competition. The purpose o...

  16. Cost containment through pharmaceutical procurement: a Caribbean case study.

    Science.gov (United States)

    Huff-Rousselle, M; Burnett, F

    1996-01-01

    This article discusses the potential for health sector cost containment in developing countries through improved pharmaceutical procurement. By describing the specific example of the Eastern Caribbean Drug Service (ECDS), which provides a pooled procurement service to nine ministries of health in the small island nations of the Caribbean, it examines the elements of the procurement operation that allowed ECDS to reduce unit costs for pharmaceuticals by over 50 per cent during its first procurement cycle. The analysis of ECDS considers: (1) political will, institutional alliances, and the creation of a public sector monopsony; (2) pooling demand; (3) restricted international tendering and the pharmaceutical industry; (4) estimating demand and supplier guarantees; (5) reducing variety and increasing volume through standardizing pack sizes, dosage forms and strengths; (6) generic bidding and therapeutic alternative bidding; (7) mode of transport from foreign suppliers; (8) financing mechanisms, including choice of currency, foreign exchange, and terms of payment; (9) market conditions and crafting and enforcing supplier contracts; and, (10) the adjudication process, including consideration of suppliers' past performance, precision requirements in the manufacturing process, number of products awarded to suppliers, and issues of judgment. The authors consider the relevance of this agency's experience to other developing countries by providing a blueprint that can be adopted or modified to suit other situations.

  17. [Critical appraisal of organ procurement under Maastricht 3 condition].

    Science.gov (United States)

    Puybasset, L; Bazin, J-E; Beloucif, S; Bizouarn, P; Crozier, S; Devalois, B; Eon, B; Fieux, F; Gisquet, E; Guibet-Lafaye, C; Kentish, N; Lienhart, A; Nicolas-Robin, A; Otero Lopez, M; Pelluchon, C; Roussin, F; Beydon, L

    2012-05-01

    The ethics committee of the French Society of Anesthesia and Intensive Care (Sfar) has been requested by the French Biomedical Agency to consider the issue of organ donation in patients after a decision of withdrawing life supporting therapies has been taken. This category of organ donation is performed in the USA, Canada, United Kingdom, the Netherlands and Belgium. The three former countries have published recommendations, which formalize procedures and operations. The Sfar ethics committee has considered this issue and envisioned the different aspects of the whole process. Consequently, it sounds a note of caution regarding the applicability of this type of organ procurement in unselected patient following a decision to withdraw life supporting therapies. According to the French regulation concerning organ procurement in brain dead patients, the committee stresses the need to restrict this specific way of procurement to severely brain injured patients, once confirmatory investigations predicting a catastrophic prognosis have been performed. It suggests that the nature of the confirmatory investigation required should be formalized by the French Biomedical Agency on behalf of the French parliamentarians. This should help preserving population trust regarding organ procurement and provide a framework to medical decision. This text has been endorsed by the Sfar. Copyright © 2012. Published by Elsevier SAS.

  18. 40 CFR Appendix I to Part 50 - Interpretation of the 8-Hour Primary and Secondary National Ambient Air Quality Standards for Ozone

    Science.gov (United States)

    2010-07-01

    ... Secondary National Ambient Air Quality Standards for Ozone 1. General. This appendix explains the data.... Primary and Secondary Ambient Air Quality Standards for Ozone. 2.1 Data Reporting and Handling Conventions... and Secondary National Ambient Air Quality Standards for Ozone I Appendix I to Part 50 Protection of...

  19. Malawi : Country Procurement Assessment Report, Volume 2. Details and Annexes

    OpenAIRE

    World Bank

    2004-01-01

    The Malawi Country Procurement Assessment Report is a joint undertaking between the Malawi Government and the World Bank to analyze the country procurement system and recommend appropriate actions to improve the efficiency, economy and transparency of the system. This report is divided into (a) an Executive Summary, (b) Main Report on Findings and Recommendations, and (c) Annexes. Since th...

  20. Public-Private Partnership in the EU Public Procurement Regime

    DEFF Research Database (Denmark)

    Andrecka, Marta

    , poses legal challenges for the procurement of PPP contracts. The overall research objective of my doctoral thesis is to analyse, clarify and discuss potential legal challenges resulting from European Union public procurement law - provided in Directive 2004/18/EC – which a public authority is obliged......My PhD research focuses on the relationship between the formation and operation of a Public-Private Partnership (PPP) and public procurement law as a legal framework for the award of the PPP contract. The complex nature of PPP projects including long term high value contracts, long award process...... to apply when awarding a Public-Private Partnership contract, as well as to analyse if a deregulation of PPP’s award framework could potentially resolve these potential legal challenges. The latter consideration of deregulation of PPP award framework is based on comparison of highly regulated European...

  1. Computational Experiment Approach to Controlled Evolution of Procurement Pattern in Cluster Supply Chain

    Directory of Open Access Journals (Sweden)

    Xiao Xue

    2015-01-01

    Full Text Available Companies have been aware of the benefits of developing Cluster Supply Chains (CSCs, and they are spending a great deal of time and money attempting to develop the new business pattern. Yet, the traditional techniques for identifying CSCs have strong theoretical antecedents, but seem to have little traction in the field. We believe this is because the standard techniques fail to capture evolution over time, nor provide useful intervention measures to reach goals. To address these problems, we introduce an agent-based modeling approach to evaluate CSCs. Taking collaborative procurement as research object, our approach is composed of three parts: model construction, model instantiation, and computational experiment. We use the approach to explore the service charging policy problem in collaborative procurement. Three kinds of service charging polices are compared in the same experiment environment. Finally, “Fixed Cost” is identified as the optimal policy under the stable market environment. The case study can help us to understand the workflow of applying the approach, and provide valuable decision support applications to industry.

  2. Sustainability, Public Procurement and SMEs - Challenges and opportunities

    DEFF Research Database (Denmark)

    Andrecka, Marta

    The global value of public procurement spending is enormous. Each year, approximately 19% of the EU GDP is spent by over 250,000 public authorities purchasing services, works and supplies. The sheer scale of public procurement spending and supplier selection decisions can literally create and shape...... supplies or services but, rather, it is understood as a process whereby organizations meet their needs in a way that achieves value for money on a lifetime basis and delivers aspects beyond savings. This includes doing business responsibly, taking a leadership position in the community and ensuring...

  3. Pre-commercial procurement : regulatory effectiveness?

    NARCIS (Netherlands)

    Apostol, Anca Ramona

    2014-01-01

    Is public procurement of research and development (‘R&D’) services the key to European Union (‘EU’)’s sustainable welfare? Is it being regulated in accordance with economic prescripts for effectiveness? Is the regulatory and policy setting clear and comprehensive in order to stimulate a widespread

  4. Evolution of the policy of legal regulation on public procurement in Lithuania

    OpenAIRE

    Ambrazevičienė, Rima

    2004-01-01

    This article aims to present in overview of the evolution of the policy of legal regulations on public procurement in Lithuania in 1990-2004. The public procurement policy in this article is understood as the concept, principles and main aims of legal regulation on this sphere. According to some scientific researchers there are two major paradigm shifts of public procurement policy in the world - a shift from internal processes to value adding benefits and a shift to opening up of public purc...

  5. Understanding public drug procurement in India: a comparative qualitative study of five Indian states.

    Science.gov (United States)

    Singh, Prabal Vikram; Tatambhotla, Anand; Kalvakuntla, Rohini; Chokshi, Maulik

    2013-01-01

    To perform an initial qualitative comparison of the different procurement models in India to frame questions for future research in this area; to capture the finer differences between the state models through 53 process and price parameters to determine their functional efficiencies. Qualitative analysis is performed for the study. Five states: Tamil Nadu, Kerala, Odisha, Punjab and Maharashtra were chosen to ensure heterogeneity in a number of factors such as procurement type (centralised, decentralised or mixed); autonomy of the procurement organisation; state of public health infrastructure; geography and availability of data through Right to Information Act (RTI). Data on procurement processes were collected through key informant analysis by way of semistructured interviews with leadership teams of procuring organisations. These process data were validated through interviews with field staff (stakeholders of district hospitals, taluk hospitals, community health centres and primary health centres) in each state. A total of 30 actors were interviewed in all five states. The data collected are analysed against 52 process and price parameters to determine the functional efficiency of the model. The analysis indicated that autonomous procurement organisations were more efficient in relation to payments to suppliers, had relatively lower drug procurement prices and managed their inventory more scientifically. The authors highlight critical success factors that significantly influence the outcome of any procurement model. In a way, this study raises more questions and seeks the need for further research in this arena to aid policy makers.

  6. Effect of the International Agreement on Government Procurement and the Government Procurement Chapter of the North American Free Trade Agreement on public contracting opportunities

    OpenAIRE

    Heldreth, Steven E.

    1994-01-01

    Approved for public release, distribution unlimited This paper explores the specific legal content of the 1979 and 1993 Agreements on Government Procurement as well as the North American Free Trade Agreement's Chapter Ten (Government Procurement). One chapter addresses the use of free trade agreements, associated problems, and how the agreements have been applied to the public sector. The content of each of the primary documents is an...

  7. Components and renewal parts in the nuclear power industry

    International Nuclear Information System (INIS)

    Clark, T.F. Jr.

    1986-01-01

    This paper indicates that the nuclear parts industry has been forced to make major investments in time, personnel and financial resources in order to solve short term/emergency procurement problems. What is required, as was previously indicated, is a coordinated industry-wide effort toward long range planning and implementation of a program that addresses these issues. The industry is developing programs directed toward inventory optimization and ''innovative-creative'' financing of manufacturing inventory/work-in-process in an effort to significantly reduce delivery lead times. Product transition, utilization of cancelled plant equipment, equipment qualification programs, and dedication of commercially manufactured/procured parts and components for safety related application continue to be major elements of our program to support current utility requirements

  8. Selection of procurement systems in the South African construction industry: An exploratory study

    Directory of Open Access Journals (Sweden)

    W. D. Thwala

    2012-12-01

    Full Text Available Purpose of this paper: Procurement systems are vital in ensuring the successful implementation of construction projects precisely in all the phases of any particular project. Therefore, this paper aims to investigate in a systematic manner the factors that influence the selection of a procurement system in the South African construction industry. Research methodology: An extensive theory and literature review of procurement systems was conducted. The literature reviewed included a sample of case studies of procurement systems successfully implemented in completed building and civil engineering projects in South Africa. A questionnaire using a four-round Delphi survey method was used to conduct the empirical study in order to obtain participants' opinions about factors influencing the selection of procurement systems as well as the utility value of various procurement systems on each factor as identified. Finally, data analysis of both qualitative and quantitative techniques was performed using the Statistical Package for Social Sciences (SPSS. Findings: After qualitative analysis, findings of the literature reviewed suggest that factors that influence the selection of procurement systems cut across all the phases of the project as identified in this paper. Therefore, these factors are categorically classified into internal and external factors. Factors from the internal environment were further classified into client characteristics and project characteristics, with client characteristics comprising of variables such as clients' level of knowledge and control, political and social consideration, familiarity of procurement systems, competition, funding arrangement, government public/private sector projects and risk allocation whereas project characteristics comprise of factors (variables such as size and technical complexity of the project, influence of the project life cycle, expedited project delivery, time, quality and price certainty. Factors

  9. 21 CFR 1403.36 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... be a selection criteria provided its application leaves an appropriate number of qualified firms... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Procurement. 1403.36 Section 1403.36 Food and.... No employee, officer or agent of the grantee or subgrantee shall participate in selection, or in the...

  10. 36 CFR 1207.36 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Procurement. 1207.36 Section 1207.36 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... resonableness can be established on the basis of a catalog or market price of a commercial product sold in...

  11. Electricity procurement for large consumers based on Information Gap Decision Theory

    Energy Technology Data Exchange (ETDEWEB)

    Zare, Kazem; Moghaddam, Mohsen Parsa; Sheikh El Eslami, Mohammad Kazem [Tarbiat Modares University, P.O. Box 14115-111, Tehran (Iran)

    2010-01-15

    In the competitive electricity market, consumers seek strategies to meet their electricity needs at minimum cost and risk. This paper provides a technique based on Information Gap Decision Theory (IGDT) to assess different procurement strategies for large consumers. Supply sources include bilateral contracts, a limited self-generating facility, and the pool. It is considered that the pool price is uncertain and its volatility around the estimated value is modeled using an IGDT model. The proposed method does not minimize the procurement cost but assesses the risk aversion or risk-taking nature of some procurement strategies with regard to the minimum cost. Using this method, the robustness of experiencing costs higher than the expected one is optimized and the related strategy is determined. The proposed method deals with optimizing the opportunities to take advantage of low procurement costs or low pool prices. A case study is used to illustrate the proposed technique. (author)

  12. An Appraisal of Project Procurement Methods in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Ujaddughe I.C.

    2010-01-01

    Full Text Available The aim of every client at the beginning of any project is to have at the end of the day a quality structure delivered on time and within budget. However, researches have shown that in most cases this aim is not met. The aim of the study that formed the basis for this paper was to identify and assess procurement methods in use in the Nigerian construction industry and identify the factors that affect the choice of the variants under the traditional and the non-conventional procurement methods. Data were collected using well-structured questionnaires administered to professionals in Lagos metropolis. Data collected were analyzed using descriptive and inferential statistics. The study reveals that the variants of traditional method of contract procurement are the most adopted in project execution in Nigeria. In making choice of procurement method, the study reveals that project completion at estimated time ranks as the highest factor considered for traditional method, while quality assurance ranks highest with non-conventional method.

  13. ASSESSMENT OF PROCUREMENT METHODS USED FOR ...

    African Journals Online (AJOL)

    Osondu

    2012-10-08

    Oct 8, 2012 ... client/or representatives so as to arrive at a tender figure and other ... client have a great influence on maintenance procurement. ... satisfaction and project success and the ... Construction Industries, and Hotels) top the list.

  14. Ghana : Country Procurement Assessment Report, Volume 3. Annexes 1-7

    OpenAIRE

    World Bank

    2004-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  15. E-Procurement and the U.S. Military

    National Research Council Canada - National Science Library

    Doe, David

    2002-01-01

    .... Meanwhile, companies worldwide are undergoing transformation as they harness the power of Internet-enabled tools, One significant aspect of industry's transformation is electronic or e-procurement...

  16. Ethical criteria for procuring and distributing organs for transplantation.

    Science.gov (United States)

    Childress, J F

    1989-01-01

    This article provides an ethical analysis and assessment of various actual and proposed policies of organ procurement and distribution in light of moral principles already embedded in U.S. institutions, laws, policies, and practices. Evaluating different methods of acquisition of human body parts--donation (express and presumed), sales, abandonment, and expropriation--the author argues for laws and policies, including required request, to maintain and facilitate express donation of organs by individuals and their families. Such laws and policies need adequate time for a determination of their effectiveness before society moves to other major alternatives, such as a market. In organ allocation and distribution, which have close moral connections with organ procurement, the author defends the judgment of the federal Task Force on Organ Transplantation that the community should have dispositional authority over donated organs, that professionals should be viewed as trustees and stewards of donated organs, and that the public should be heavily involved in the formation of policies of allocation and distribution. Concentrating on policies being developed in the United Network for Organ Sharing, the author examines the point system for cadaveric kidneys, the access of foreign nationals to organs donated in the U.S., and the multiple listings of patients seeking transplants. He concludes by identifying two major problems of equitable access to donated organs that will have to be addressed by social institutions other than UNOS: access to the waiting list for donated organs and the role of ability to pay in extrarenal transplants.

  17. Incentivizing secondary raw material markets for sustainable waste management.

    Science.gov (United States)

    Schreck, Maximilian; Wagner, Jeffrey

    2017-09-01

    Notwithstanding several policy initiatives in many countries over a number of years, there remains a general sense that too much municipal solid waste is generated and that too much of the waste that is generated is landfilled. There is an emerging consensus that a sustainable approach to waste management requires further development of secondary raw material markets. The purpose of this paper is to propose a theoretical economic model that focuses upon this stage of a sustainable waste management program and explores policy options that could motivate efficiency in secondary raw material markets. In particular, we show how firm profit and social welfare optimizing objectives can be reconciled in a two-product market of waste management processes: landfilling and material reclamation. Our results provide theoretical support for building out recent Circular Economy initiatives as well as for the relatively recent emergence of landfill mining as a means for procuring secondary raw materials. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. Endoscopic versus transcranial procurement of allograft tympano-ossicular systems: a prospective double-blind randomized controlled audit.

    Science.gov (United States)

    Caremans, Jeroen; Hamans, Evert; Muylle, Ludo; Van de Heyning, Paul; Van Rompaey, Vincent

    2016-06-01

    Allograft tympano-ossicular systems (ATOS) have proven their use over many decades in tympanoplasty and reconstruction after resection of cholesteatoma. The transcranial bone plug technique has been used in the past 50 years to procure en bloc ATOS (tympanic membrane with malleus, incus and stapes attached). Recently, our group reported the feasibility of the endoscopic procurement technique. The aim of this study was to assess whether clinical outcome is equivalent in ATOS acquired by using the endoscopic procurement technique compared to ATOS acquired by using the transcranial technique. A double-blind randomized controlled audit was performed in a tertiary referral center in patients that underwent allograft tympanoplasty because of chronic otitis media with and without cholesteatoma. Allograft epithelialisation was evaluated at the short-term postoperative visit by microscopic examination. Failures were reported if reperforation was observed. Fifty patients underwent allograft tympanoplasty: 34 received endoscopically procured ATOS and 16 received transcranially procured ATOS. One failed case was observed, in the endoscopic procurement group. We did not observe a statistically significant difference between the two groups in failure rate. This study demonstrates equivalence of the clinical outcome of allograft tympanoplasty using either endoscopic or transcranial procured ATOS and therefore indicates that the endoscopic technique can be considered the new standard procurement technique. Especially because the endoscopic procurement technique has several advantages compared to the former transcranial procurement technique: it avoids risk of prion transmission and it is faster while lacking any noticeable incision.

  19. Environmental Criteria in the Spanish Public Works Procurement Process

    OpenAIRE

    José Luis Fuentes-Bargues; Mª Carmen González-Cruz; Cristina González-Gaya

    2017-01-01

    Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group ...

  20. Which role for public procurement in Italy. A premise

    OpenAIRE

    Traù Fabrizio

    2009-01-01

    This is a premise to a series of papers aimed at stressing the role that public procurement may play (and actually plays within specific industrial systems) as to the development and diffusion of innovative practices within manufacturing industry. The issue is addressed from the point of view of the guidelines for industrial policy recently set by National Authorities in the Italian experience. Among the papers a survey of the activity of the Italian Agency for public procurement (Consip) is ...

  1. Technology transfer and technological learning through CERN's procurement activity

    CERN Document Server

    Autio, Erkko; Hameri, Ari-Pekka; CERN. Geneva

    2003-01-01

    This report analyses the technological learning and innovation benefits derived from CERN's procurement activity during the period 1997-2001. The base population of our study, the technology-intensive suppliers to CERN, consisted of 629 companies out of 6806 companies during the same period, representing 1197 MCHF in procurement. The main findings from the study can be summarized as follows: the various learning and innovation benefits (e.g., technological learning, organizational capability development, market learning) tend to occur together. Learning and innovation benefits appear to be regulated by the quality of the supplier's relationship with CERN: the greater the amount of social capital built into the relationship, the greater the learning and innovation benefits. Regardless of relationship quality, virtually all suppliers derived significant marketing reference benefits from CERN. Many corollary benefits are associated with procurement activity. As an example, as many as 38% of the respondents devel...

  2. Information Technology Procurement Authorization (ITPA) Tracking System

    Data.gov (United States)

    Office of Personnel Management — Information Technology Procurement Authorization (ITPA) Tracking System is used for gathering consistent data from U.S. Office of Personnel Management (OPM) program...

  3. 41 CFR 101-26.602-5 - Procurement of natural gas from the wellhead and other supply sources.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of natural... Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.6-Procurement Sources Other Than GSA § 101...

  4. Lessons learnt from the use of relationship-based procurement methods in Australia: clients’ perspectives

    Directory of Open Access Journals (Sweden)

    Farshid Rahmani

    2016-06-01

    Full Text Available This paper aims to review the use of various construction procurement systems and present the development of Relationship-Based Procurement (RBP Methods currently in use within the Australian construction industry. Therefore, this paper provides the historical development of procurement briefly and then focuses on the adoption of Relationship-Based Procurement (RBP approaches in the Australian construction industry to investigate the future direction of the collaborative project procurement arrangements. Semi-structured interviews with high-level managers in the Australian state government organizations have been conducted to answer the research question. A discussion has been presented about the potential future tendency of the industry in adopting a RBP. The findings suggest that even though relationship based procurement systems offer significant benefits; they are not popular among the public sector decision makers because of inability to demonstrate Value for Money (VfM propositions for public projects. Other reasons which may cause a move away from using RBPs in the future include the need for managers to fully engage throughout the project, and the lack of collaborative environment within the construction industry in general.

  5. Healthy Food Procurement Policies and Their Impact

    Science.gov (United States)

    Niebylski, Mark L.; Lu, Tammy; Campbell, Norm R. C.; Arcand, Joanne; Schermel, Alyssa; Hua, Diane; Yeates, Karen E.; Tobe, Sheldon W.; Twohig, Patrick A.; L’Abbé, Mary R.; Liu, Peter P.

    2014-01-01

    Unhealthy eating is the leading risk for death and disability globally. As a result, the World Health Organization (WHO) has called for population health interventions. One of the proposed interventions is to ensure healthy foods are available by implementing healthy food procurement policies. The objective of this systematic review was to evaluate the evidence base assessing the impact of such policies. A comprehensive review was conducted by searching PubMed and Medline for policies that had been implemented and evaluated the impact of food purchases, food consumption, and behaviors towards healthy foods. Thirty-four studies were identified and found to be effective at increasing the availability and purchases of healthy food and decreasing purchases of unhealthy food. Most policies also had other components such as education, price reductions, and health interventions. The multiple gaps in research identified by this review suggest that additional research and ongoing evaluation of food procurement programs is required. Implementation of healthy food procurement policies in schools, worksites, hospitals, care homes, correctional facilities, government institutions, and remote communities increase markers of healthy eating. Prior or simultaneous implementation of ancillary education about healthy eating, and rationale for the policy may be critical success factors and additional research is needed. PMID:24595213

  6. Pakistan : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2000-01-01

    This report analyzes Pakistan's procurement system, and presents an extensive set of recommendations for strengthening same. It reviews the legal, and regulatory framework, as well as the mandatory registration and/or pre-qualification of suppliers, and contractors, and negotiation practices, and, analyzes bidding document issues for recommendation. Human resources development, auditing pr...

  7. Federal procurement of unlicensed medicines in Brazil; findings and implications.

    Science.gov (United States)

    Teodoro, Cristiane Roberta Dos Santos; Caetano, Rosângela; Godman, Brian; Dos Reis, André Luís Almeida; Maia, Aurélio de Araújo; Ramos, Mariana de Carvalho Barbosa; Osorio-de-Castro, Claudia Garcia Serpa

    2017-12-01

    There are safety concerns with using unlicensed medicines across countries including Brazil. Consequently this needs to be evaluated and concerns address if pertinent. Investigate such purchases by the Brazilian Federal Government from 2004 to 2013. Procurement data from a public-access databank that contains procurement information of the Brazilian Federal Government. Each procured item was cross-referenced to its active drug approval status in the Brazilian National Register (DOU). Exploratory analysis and trend measures were performed for the variables for mapping and characterizing the purchases of non-market approved drugs. 614 (0.14%) purchases in ten years corresponding to 64 unlicensed medicines - some of which had orphan drug status - and 48 different active substances; with a growing trend in recent years. Medicines in 51% of purchases were procured before obtaining marketing approval - with eventual refusals occurring in 17.8% and cancellation due to lack of efficacy and/or safety concerns in 1.1%. Health litigation accounted for 81.9% of purchases and growing in recent years. Overall a low rate of unlicensed medicine use. However there are concerns given the current regulations in Brazil and the recent increase in the use of unlicensed medicines with increased litigation.

  8. Development of a Procurement Management Framework in Ghana: A New Paradigm for Interdisciplinary Postgraduate Education

    Science.gov (United States)

    Owusu-Manu, D.; Badu, E.; Edwards, D. J.

    2011-01-01

    Procurement in the corporate world is increasingly complex, multi-faceted and interdisciplinary. This paper explores existing knowledge specifications relating to procurement management competencies and proposes a new procurement management competency framework (PMCF) and a competency-based postgraduate programme for postgraduate students in…

  9. Providing Social Enterprises with Better Access to Public Procurement : The Development of Supportive Legal Frameworks

    NARCIS (Netherlands)

    Argyrou, A.

    2017-01-01

    This article discusses the issue of social enterprises gaining access to public procurement processes and contracts at the EU and national level. It primarily examines the opportunities for social enterprises to access public procurement contracts provided for in the Public Procurement Directive

  10. 41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.

    Science.gov (United States)

    2010-07-01

    ... from local purchase sources, when local purchase authority and capability exists, or by submitting... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of gasoline... REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.6-Procurement Sources Other Than GSA...

  11. SPP Toolbox: Supporting Sustainable Public Procurement in the Context of Socio-Technical Transitions

    Directory of Open Access Journals (Sweden)

    Paula Cayolla Trindade

    2017-12-01

    Full Text Available Public procurement can shape production and consumption trends and represents a stimulus for both innovation and diversification in products and services, through a direct increase in demand. In recent years, the interest in demand-side policies has grown and several approaches have emerged, such as Green Public Procurement (GPP, Sustainable Public Procurement (SPP and Public Procurement of Innovation (PPI, representing strategic goals to be achieved through public procurement. In this context, there is a need to guide and support public organizations in the uptake of GPP, SPP and PPI practices. To respond to the challenges raised by the operationalization of such strategies, this paper proposes a new tool—the SPP Toolbox—for guiding public organizations as they re-think the procurement process, raising their ambitions and broadening their vision, thus changing the organizational approach towards culture, strategies, structures and practices. This toolbox integrates insights from GPP, SPP and PPI objectives and practices, in the context of the emergence of socio-technical transitions. The toolbox coherently links GPP, SPP and PPI, allowing flexibility in terms of goals, yet promoting an increasing complexity of institutionalized practices and skills—from GPP to SPP and then from SPP to PPI, organized in a framework fully integrated into the organizational strategy.

  12. Contracting Out Government Procurement Functions: An Analysis

    National Research Council Canada - National Science Library

    Lamm, David; Yoder, Cory

    2008-01-01

    ...)), asked the Naval Postgraduate School (NPS) to analyze the contracting out of procurement functions currently being accomplished by Navy, Marine Corps, and other Department of Defense (DOD) Activities...

  13. Economic theory and the application of incentive contracts to procure operating reserves

    International Nuclear Information System (INIS)

    Wang, L.; Yu, C.W.; Wen, F.S.

    2007-01-01

    The ancillary services market plays an important role in the operation of an electricity market, especially for achieving a high level of reliability. Among all ancillary services, operating reserve is an important research focus, with the attention mainly on the optional procurement and pricing methods. These methods differ in many aspects, including the objective, allocation of risks, and feasibility. In this paper, a new approach is proposed to analyze the users' reserve procurement problem and a novel reserve trade mechanism is developed between electricity users and the retailer of the market. First, the differences between the procurement of operating reserve in decentralized and centralized ways are analyzed. The comparison of the equilibrium solutions reveals that the centralized procurement that results in a systemic optimal solution is better than the decentralized procurement that results in a Nash equilibrium solution. Furthermore, an incentive contract based on a Principal-agent model, that is able to induce a systemic optimality as well as a Pareto equilibrium and manage risks at the same time is designed. The proposed model is equitable and beneficial to all participants. An example is served to illustrate the features of the model and the methodology. (author)

  14. European defence industry consolidation and domestic procurement bias

    DEFF Research Database (Denmark)

    Kluth, Michael Friederich

    2017-01-01

    How have European cross-border defence industrial mergers and acquisitions affected domestic procurement bias among the major EU powers? This article departs from the findings of Andrew Moravcsik more than two decades ago suggesting that major West European states had no ingrained preferences...... for defence industrial autarchy. When cross-national armament projects were derailed, this could be attributed to political efforts of national defence industrial champions favouring purely domestic projects. As former national champions join pan-European defence groups, their preferences are likely modified......-border defence industry consolidation will be analysed. Procurement bias is assessed in two industry segments characterised by pervasive consolidation....

  15. Navy Acquisition Executive's Management Oversight and Procurement Authority Category I and II Programs

    National Research Council Canada - National Science Library

    2007-01-01

    .... This report discusses the management oversight and procurement authority within the Navy. Two other reports discussed the management oversight and procurement authority within the Army and Air Force...

  16. 38 CFR 49.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 49.46... of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. (Authority: Pub. L. 104-156; 110 Stat. 1396) ...

  17. A critical view of the German procurement process in the sector

    Directory of Open Access Journals (Sweden)

    Alexander Hofacker

    Full Text Available This paper makes a critical analysis of the German procurement process in the public sector, based on a case study carried out at Karlsruhe University. The research protocol for the field study was developed in three phases: direct dialogue with the head of the department, document analysis, and semi-structured interviews. Data collection was concerned with both the analysis of the organization as well as with the mapping of project activities. A detailed study was carried out on a single construction project in order to enable the development of a value stream map of the procurement macro processes. Based on the data, the authors present a set of proposals for a radical improvement in the German procurement process, focusing on shortening the cycle time, increasing transparency and improving value generation. The study reinforces the need for more research focused on lean production concepts and principles in the public sector. By identifying radical improvement opportunities in the German procurement process, it may be possible to convince politicians and decision makers to change structures of responsibilities and to apply lean principles in public administration. The paper appears to be one of the first studies to apply lean principles into the procurement process of governmental organizations, in order to simplify processes, reduce waste and better allocate resources in order to add more value for the end-users.

  18. Potential Accession to the WTO Government Procurement Agreement: A Case-Study on India

    OpenAIRE

    Sangeeta Khorana; Sujitha Subramanian

    2012-01-01

    The World Trade Organization (WTO) Government Procurement Agreement (GPA) is a voluntary plurilateral agreement applicable to WTO members that choose to be Parties to the Agreement. Most developing countries, including India, are not members of the GPA. This case study presents an insight into India's current procurement framework, evaluates the prospects for, and comments on the principal constraints and challenges to India's GPA accession. The findings suggest that, though the Indian procur...

  19. Problems affecting the operational procurement process: A study of the Zimbabwean public sector

    Directory of Open Access Journals (Sweden)

    Abel Dzuke

    2017-02-01

    Full Text Available Background: The public sector occupies a key role in the economy comprising the appropriation of state revenue to purchase goods and to render services productively, while ensuring the optimum utilisation of available funds and resources to benefit the inhabitants of the country. Problems in the Zimbabwean public procurement sector that detract from service delivery are key contemporary issues. This is evident from the numerous complaints of poor service delivery received by the public that can be attributed to public procurement. Objective: The purpose of this article was to report on a study that investigated problems in the different stages of the operational procurement process in the Zimbabwean public sector that detract from service delivery, the extent of these problems and how the public procurement process can be improved to enhance service delivery. Method: This descriptive and exploratory study followed a quantitative approach. Data were collected by means of a questionnaire administered to all public entities in Zimbabwe. Data were analysed using SPSS. Results: The majority of the identified problems in the public procurement sector that detract from service delivery are found in the advertising, bid evaluation and contract stages. Conclusion: As only a few studies on this topic have been conducted in Zimbabwe, the findings of this research add a significant perspective to the existing body of knowledge and can assist stakeholders with regard to how the public procurement process can be improved in order to enhance service delivery through public procurement process reform and restructuring.

  20. Corruption and innovation in the Albanian public procurement system

    OpenAIRE

    Reida Kashta

    2014-01-01

    This paper examines the measures and means used to fight against corruption in public procurement in Albania. Because public procurement is one of the key areas where the public sector and the private sector interact financially and this interaction is based on public money, it is a prime candidate for corrupt activity, cronyism and favoritism as well as outright bribery. The question marks that this paper raises are: what are the means used in the war against corruption in the public ...

  1. Cosima B2B - Sales Automation for E-Procurement

    OpenAIRE

    Kießling, Werner (Prof. Dr.); Fischer, Stefan; Döring, Sven

    2006-01-01

    E-procurement is one of the fastest growing application areas for e-commerce. Though B2B transaction costs could be reduced recently by establishing XML based standards for electronic product catalogs and data interchange, B2B sales costs are still high due to the amount of human interaction. For the first time we present a fully automated electronic sales agent for e-procurement portals. The key technologies for this breakthrough are based on preferences modeled as strict partial orders, ena...

  2. Environmental criteria in the Spanish Public Works Procurement Process

    OpenAIRE

    Fuentes Bargues, José Luis; González-Cruz, María-Carmen; González-Gaya, Cristina

    2017-01-01

    [EN] Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain g...

  3. 13 CFR 124.507 - What procedures apply to competitive 8(a) procurements?

    Science.gov (United States)

    2010-01-01

    ... boundaries are eligible to submit offers. (3) Competition for all non-construction requirements. Except for... procedures. Procuring activities will conduct competitions among and evaluate offers received from... the Participant submitted its initial offer which includes price. (5) If the procuring activity...

  4. Scoping Aerospace: Tracking Federal Procurement and R&D Spending in the Aerospace Sector

    National Research Council Canada - National Science Library

    Hogan, Thor; Fossum, Donna; Johnson, Dana J; Painter, Lawrence S

    2005-01-01

    .... The study provides a detailed examination of the Federal Procurement Data System (FPDS), with the specific purpose of tracking all government aerospace procurement and research and development (R AND D...

  5. 78 FR 35874 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-06-14

    ... proposed for addition to the Procurement List for production by the nonprofit agencies listed: Products... Cleaner NPA: Winston-Salem Industries for the Blind, Inc., Winston-Salem, NC Contracting Activity: Defense...

  6. What a public procurer of innovation should know and be able to do

    DEFF Research Database (Denmark)

    Rolfstam, Max; Ågren, Robert

    Taking as the starting point the increasing interest for utilizing public procurement as a means to stimulate innovation, this paper explores some considerations for curriculum development for teaching public procurement of innovation. A basic understanding of what is a curriculum was used...... as a foundation for the development of a master level course in public procurement of innovation in a university setting. The course is outlined together with some examples of teaching activities included in the curriculum....

  7. Playing the game of public procurement of innovation:Experiences from a University Course

    OpenAIRE

    Rolfstam, Max

    2014-01-01

    Given the emergence and diffusion of policies aiming at promoting the utilisation of public procurement as an innovation policy instrument, it is remarkable that very little scholarly attention has been given to the teaching of public procurement of innovation. This paper sets out to contribute towards mending this gap, by discussing some considerations made in the context of the development and set up of a university course in public procurement of innovation. A major challenge for such an e...

  8. Designing flexible procurement systems

    OpenAIRE

    Hughes, Will

    1990-01-01

    The systems used for the procurement of buildings are organizational systems. They involve people in a series of strategic decisions, and a pattern of roles, responsibilities and relationships that combine to form the organizational structure of the project. To ensure effectiveness of the building team, this organizational structure needs to be contingent upon the environment within which the construction project takes place. In addition, a changing environment means that the organizational s...

  9. Organ procurement: let's presume consent

    OpenAIRE

    Moustarah, F

    1998-01-01

    IN WINNING FIRST PRIZE in the Logie Medical Ethics Essay Contest in 1997, Dr. Fady Moustarah made a strong and compelling argument in favour of presumed consent in the procurement of donor organs. He stressed that a major education campaign will be needed when such a policy is adopted lest some people begin to regard physicians as "organ vultures."

  10. Procurement of complex performance in public infrastructure: a process perspective

    OpenAIRE

    Hartmann, Andreas; Roehrich, Jens; Davies, Andrew; Frederiksen, Lars; Davies, J.; Harrington, T.; Kirkwood, D.; Holweg, M.

    2011-01-01

    The paper analyzes the process of transitioning from procuring single products and services to procuring complex performance in public infrastructure. The aim is to examine the change in the interactions between buyer and supplier, the emergence of value co-creation and the capability development during the transition process. Based on a multiple, longitudinal case study the paper proposes three generic transition stages towards increased performance and infrastructural complexity. These stag...

  11. The measurement and role of government procurement in macroeconomic statistics

    OpenAIRE

    Sumit Dey-Chowdhury; Geoff Tily

    2007-01-01

    Details the measurement and role of government procurement in the UK National Accounts, including existing data methodcollections, and identifies specific initiatives.This article details the measurement and role of government procurement in the UK National Accounts. The needfor an accurate estimate has increased following both internal and external users’ analytical requirements, in particularthe development of measures of market sector gross value added, emphasis on government productivit...

  12. Scientific, legal, and ethical challenges of end-of-life organ procurement in emergency medicine.

    Science.gov (United States)

    Rady, Mohamed Y; Verheijde, Joseph L; McGregor, Joan L

    2010-09-01

    We review (1) scientific evidence questioning the validity of declaring death and procuring organs in heart-beating (i.e., neurological standard of death) and non-heart-beating (i.e., circulatory-respiratory standard of death) donation; (2) consequences of collaborative programs realigning hospital policies to maximize access of procurement coordinators to critically and terminally ill patients as potential donors on arrival in emergency departments; and (3) ethical and legal ramifications of current practices of organ procurement on patients and their families. Relevant publications in peer-reviewed journals and government websites. Scientific evidence undermines the biological criteria of death that underpin the definition of death in heart-beating (i.e., neurological standard) and non-heart-beating (i.e., circulatory-respiratory standard) donation. Philosophical reinterpretation of the neurological and circulatory-respiratory standards in the death statute, to avoid the appearance of organ procurement as an active life-ending intervention, lacks public and medical consensus. Collaborative programs bundle procurement coordinators together with hospital staff for a team-huddle and implement a quality improvement tool for a Rapid Assessment of Hospital Procurement Barriers in Donation. Procurement coordinators have access to critically ill patients during the course of medical treatment with no donation consent and with family or surrogates unaware of their roles. How these programs affect the medical care of these patients has not been studied. Policies enforcing end-of-life organ procurement can have unintended consequences: (1) erosion of care in the patient's best interests, (2) lack of transparency, and (3) ethical and legal ramifications of flawed standards of declaring death. Copyright 2010 Elsevier Ireland Ltd. All rights reserved.

  13. E-Procurement, from Project to Practice: Empirical Evidence from the French Public Sector

    Science.gov (United States)

    Beauvallet, Godefroy; Boughzala, Younès; Assar, Saïd

    Public procurement constitutes a significant portion of national PIB in all countries and electronic platforms for supporting public transactions are an important application of e-government. In France, new regulations since 2005 are pushing public and private actors to adopt electronic means for handling all steps of the purchase process in public organisations. Based on quantitative and qualitative surveys made between 2005 and 2008, this chapter presents the general topic of e-procurement and specifically discusses the problem of e-procurement adoption in public institutions in France. The conclusions of these investigations spanning a three years period, are that public e-procurement is constantly progressing, although difficulties related to insufficient technical skills and the complexity of the juridical context hinder seriously its full adoption. They also show that a digital and an organisational divide is appearing between big administrations which have the adequate resources and skills to fully adopt e-procurement, and small administration (i.e. local authorities) which are still reluctant or unable to conduct a purchase in a digital manner.

  14. Introduction of the commercial grade dedication into Nuclear Power Plant Krsko (NEK) procurement process

    International Nuclear Information System (INIS)

    Heruc, Z.; Gajsak, Z.; Nikpalj, R.

    1996-01-01

    NEK management has undertaken a set of actions to improve the ability to provide equipment, spare parts and material needed to support operation and maintenance of the Krsko plant. These actions are necessary due primarily to the fact that NEK is more and more confronted (increasing trend) with the issue that suppliers of safety-related equipment and spare parts have decided not to pursue the nuclear portion of their business, incl. specific QA systems and qualifications. The purchase orders imposing these requirements are no longer accepted. In order to continue to obtain the necessary materials at the required quality level, a 'Commercial Grade Item' (CGI) procurement and dedication program has been developed based on similar practices in USA. (author)

  15. Spare parts management for nuclear research reactors [Paper No.: I-14

    International Nuclear Information System (INIS)

    Kini, M.P.

    1981-01-01

    Most of the equipment installed at CIRUS and other reactors are imported units. CIRUS reactor is 20 years old and with present problems for obtaining spare parts for this equipment, indigenous effort in procurement has become imperative. In the absence of specifications and drawings for most of the components, the task of indigenous procurement has become quite demanding. The efforts put by Reactor Operations Division of the Bhabha Atomic Research Centre, Bombay in locating local manufacturers who are willing to fabricate in small quantities of spare parts to specifications and the difficulties involved is the theme of this paper. The paper also covers the efforts on equipment replacement, its success and failures. (author)

  16. Malawi : Country Procurement Assessment Report, Volume 1. Main Findings and Recommendations

    OpenAIRE

    World Bank

    2004-01-01

    The Malawi Country Procurement Assessment Report is a joint undertaking between the Malawi Government and the World Bank to analyze the country procurement system and recommend appropriate actions to improve the efficiency, economy and transparency of the system. This report is divided into (a) an Executive Summary, (b) Main Report on Findings and Recommendations, and (c) Annexes. Since th...

  17. Assessment of procurement methods used for executing ...

    African Journals Online (AJOL)

    Assessment of procurement methods used for executing maintenance works in Lagos state. ... Ethiopian Journal of Environmental Studies and Management ... Others are risk allocation, price competition and flexibility of contract. Finally, better ...

  18. 78 FR 59658 - Procurement List; Additions

    Science.gov (United States)

    2013-09-27

    ... Accordingly, the following products and services are added to the Procurement List: Products Laundry Net... ADMINISTRATION, BOULDER, CO. Service Type/Location: Laundry Service, US Coast Guard Base, Portsmouth, VA. NPA... GUARD, BASE PORTSMOUTH, PORTSMOUTH, VA Service Type/Location: Laundry Service, Federal Bureau of Prisons...

  19. Procurement Officer | IDRC - International Development Research ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... efficient, and ethical and provide the best possible value to the IDRC; supporting the ... procurement processes are perceived by suppliers as fair, open and ethical; ... while ensuring to protect confidential information;; analyses, negotiates and ... and knowledge, and interpret, assess and communicate current IDRC policy, ...

  20. 77 FR 60969 - Procurement List; Additions

    Science.gov (United States)

    2012-10-05

    ... Are Blind or Severely Disabled published a notice for additions to the Procurement List with the... Committee for Purchase From People Who Are Blind or Severely Disabled published notices of proposed..., Phoenix, AZ. Service Type/Location: Custodial and Grounds Maintenance Services, Austin Courthouse, 501...