WorldWideScience

Sample records for scidac fusiongrid project a

  1. SciDAC Fusiongrid Project--A National Collaboratory to Advance the Science of High Temperature Plasma Physics for Magnetic Fusion

    Energy Technology Data Exchange (ETDEWEB)

    SCHISSEL, D.P.; ABLA, G.; BURRUSS, J.R.; FEIBUSH, E.; FREDIAN, T.W.; GOODE, M.M.; GREENWALD, M.J.; KEAHEY, K.; LEGGETT, T.; LI, K.; McCUNE, D.C.; PAPKA, M.E.; RANDERSON, L.; SANDERSON, A.; STILLERMAN, J.; THOMPSON, M.R.; URAM, T.; WALLACE, G.

    2006-08-31

    This report summarizes the work of the National Fusion Collaboratory (NFC) Project funded by the United States Department of Energy (DOE) under the Scientific Discovery through Advanced Computing Program (SciDAC) to develop a persistent infrastructure to enable scientific collaboration for magnetic fusion research. A five year project that was initiated in 2001, it built on the past collaborative work performed within the U.S. fusion community and added the component of computer science research done with the USDOE Office of Science, Office of Advanced Scientific Computer Research. The project was a collaboration itself uniting fusion scientists from General Atomics, MIT, and PPPL and computer scientists from ANL, LBNL, Princeton University, and the University of Utah to form a coordinated team. The group leveraged existing computer science technology where possible and extended or created new capabilities where required. Developing a reliable energy system that is economically and environmentally sustainable is the long-term goal of Fusion Energy Science (FES) research. In the U.S., FES experimental research is centered at three large facilities with a replacement value of over $1B. As these experiments have increased in size and complexity, there has been a concurrent growth in the number and importance of collaborations among large groups at the experimental sites and smaller groups located nationwide. Teaming with the experimental community is a theoretical and simulation community whose efforts range from applied analysis of experimental data to fundamental theory (e.g., realistic nonlinear 3D plasma models) that run on massively parallel computers. Looking toward the future, the large-scale experiments needed for FES research are staffed by correspondingly large, globally dispersed teams. The fusion program will be increasingly oriented toward the International Thermonuclear Experimental Reactor (ITER) where even now, a decade before operation begins, a large

  2. Building a Universal Nuclear Energy Density Functional (UNEDF). SciDAC-2 Project

    Energy Technology Data Exchange (ETDEWEB)

    Vary, James P. [Iowa State University, Ames, IA (United States); Carlson, Joe; Furnstahl, Dick; Horoi, Mihai; Lusk, Rusty; Nazarewicz, Witek; Ng, Esmond; Thompson, Ian

    2012-09-29

    An understanding of the properties of atomic nuclei is crucial for a complete nuclear theory, for element formation, for properties of stars, and for present and future energy and defense applications. During the period of Dec. 1 2006 – Jun. 30, 2012, the UNEDF collaboration carried out a comprehensive study of all nuclei, based on the most accurate knowledge of the strong nuclear interaction, the most reliable theoretical approaches, the most advanced algorithms, and extensive computational resources, with a view towards scaling to the petaflop platforms and beyond. Until recently such an undertaking was hard to imagine, and even at the present time such an ambitious endeavor would be far beyond what a single researcher or a traditional research group could carry out. The UNEDF SciDAC project has developed several key computational codes and algorithms for reaching the goal of solving the nuclear quantum many-body problem throughout the chart of nuclei. Without such developments, scientific progress would not be possible. In addition the UNEDF SciDAC successfully applied these developments to solve many forefront research problems.

  3. Building a Universal Nuclear Energy Density Functional (UNEDF): SciDAC-2 Project

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Joe; Furnstahl, Dick; Lusk, Rusty; Nazarewicz, Witek; Ng, Esmond; Thompson, Ian; Vary, James

    2012-06-30

    An understanding of the properties of atomic nuclei is crucial for a complete nuclear theory, for element formation, for properties of stars, and for present and future energy and defense applications. During the period of Dec. 1, 2006 - Jun. 30, 2012, the UNEDF collaboration carried out a comprehensive study of all nuclei based on the most accurate knowledge of the strong nuclear interaction, the most reliable theoretical approaches, the most advanced algorithms, and extensive computational resources, with a view towards scaling to the petaflop platforms and beyond. The long-term vision initiated with UNEDF is to arrive at a comprehensive, quantitative, and unified description of nuclei and their reactions, grounded in the fundamental interactions between the constituent nucleons. We seek to replace current phenomenological models of nuclear structure and reactions with a well-founded microscopic theory that delivers maximum predictive power with well-quantified uncertainties. Specifically, the mission of this project has been three-fold: first, to find an optimal energy density functional (EDF) using all our knowledge of the nucleonic Hamiltonian and basic nuclear properties; second, to apply the EDF theory and its extensions to validate the functional using all the available relevant nuclear structure and reaction data; and third, to apply the validated theory to properties of interest that cannot be measured, in particular the properties needed for reaction theory.

  4. Building the US National Fusion Grid: results from the National Fusion Collaboratory Project

    International Nuclear Information System (INIS)

    Schissel, D.P.; Burruss, J.R.; Finkelstein, A.; Flanagan, S.M.; Foster, I.T.; Fredian, T.W.; Greenwald, M.J.; Johnson, C.R.; Keahey, K.; Klasky, S.A.; Li, K.; McCune, D.C.; Papka, M.; Peng, Q.; Randerson, L.; Sanderson, A.; Stillerman, J.; Stevens, R.; Thompson, M.R.; Wallace, G.

    2004-01-01

    The US National Fusion Collaboratory Project is developing a persistent infrastructure to enable scientific collaboration for all aspects of magnetic fusion research. The project is creating a robust, user-friendly collaborative software environment and making it available to more than 1000 fusion scientists in 40 institutions who perform magnetic fusion research in the United States. In particular, the project is developing and deploying a national Fusion Energy Sciences Grid (FusionGrid) that is a system for secure sharing of computation, visualization, and data resources over the Internet. The FusionGrid goal is to allow scientists at remote sites to fully participate in experimental and computational activities as if they were working at a common site thereby creating a virtual organization of the US fusion community. The project is funded by the USDOE Office of Science, Scientific Discovery through Advanced Computing (SciDAC) Program and unites fusion and computer science researchers to directly address these challenges

  5. Final Report for DOE Project: Portal Web Services: Support of DOE SciDAC Collaboratories

    Energy Technology Data Exchange (ETDEWEB)

    Mary Thomas, PI; Geoffrey Fox, Co-PI; Gannon, D; Pierce, M; Moore, R; Schissel, D; Boisseau, J

    2007-10-01

    Grid portals provide the scientific community with familiar and simplified interfaces to the Grid and Grid services, and it is important to deploy grid portals onto the SciDAC grids and collaboratories. The goal of this project is the research, development and deployment of interoperable portal and web services that can be used on SciDAC National Collaboratory grids. This project has four primary task areas: development of portal systems; management of data collections; DOE science application integration; and development of web and grid services in support of the above activities.

  6. The impact of SciDAC on US climate change research and the IPCC AR4

    International Nuclear Information System (INIS)

    Wehner, Michael

    2005-01-01

    SciDAC has invested heavily in climate change research. We offer a candid opinion as to the impact of the DOE laboratories' SciDAC projects on the upcoming Fourth Assessment Report of the Intergovernmental Panel on Climate Change

  7. Preface: SciDAC 2009

    Science.gov (United States)

    Simon, Horst

    2009-07-01

    By almost any measure, the SciDAC community has come a long way since DOE launched the SciDAC program back in 2001. At the time, we were grappling with how to efficiently run applications on terascale systems (the November 2001 TOP500 list was led by DOE's ASCI White IBM system at Lawrence Livermore achieving 7.2 teraflop/s). And the results stemming from the first round of SciDAC projects were summed up in two-page reports. The scientific results were presented at annual meetings, which were by invitation only and typically were attended by about 75 researchers. Fast forward to 2009 and we now have SciDAC Review, a quarterly magazine showcasing the scientific computing contributions of SciDAC projects and related programs, all focused on presenting a comprehensive look at Scientific Discovery through Advanced Computing. That is also the motivation behind the annual SciDAC conference that in 2009 was held from June 14-18 in San Diego. The annual conference, which can also be described as a celebration of all things SciDAC, grew out those meetings organized in the early days of the program. In 2005, the meeting was held in San Francisco and attendance was opened up to all members of the SciDAC community. The schedule was also expanded to include a keynote address, plenary speakers and other features found in a conference format. This year marks the fifth such SciDAC conference, which now comprises four days of computational science presentations, multiple poster sessions and, since last year, an evening event showcasing simulations and modeling runs resulting from SciDAC projects. The fifth annual SciDAC conference was remarkable on several levels. The primary purpose, of course, is to showcase the research accomplishments resulting from SciDAC programs in particular and computational science in general. It is these accomplishments, represented in 38 papers and 52 posters, that comprise this set of conference proceedings. These proceedings can stand alone as

  8. Preface: SciDAC 2007

    Science.gov (United States)

    Keyes, David E.

    2007-09-01

    archive reflects the philosophy of the SciDAC program, which was introduced as a collaboration of all of the program offices in the Office of Science of the U.S. Department of Energy (DOE) in Fall 2001 and was renewed for a second period of five years in Fall 2006, with additional support in certain areas from the DOE's National Nuclear Security Administration (NNSA) and the U.S. National Science Foundation (NSF). All of the projects in the SciDAC portfolio were represented at the conference and most are captured in this volume. In addition, the Organizing Committee incorporated into the technical program a number of computational science highlights from outside of SciDAC, and, indeed, from outside of the United States. As implied by the title, scientific discovery is the driving deliverable of the SciDAC program, spanning the full range of the DOE Office of Science: accelerator design, astrophysics, chemistry and materials science, climate science, combustion, life science, nuclear physics, plasma physics, and subsurface physics. As articulated in the eponymous report that launched SciDAC, the computational challenges of these diverse areas are remarkably common. Each is profoundly multiscale in space and time and therefore continues to benefit at any margin from access to the largest and fastest computers available. Optimality of representation and execution requires adaptive, scalable mathematical algorithms in both continuous (geometrically complex domain) and discrete (mesh and graph) aspects. Programmability and performance optimality require software environments that both manage the intricate details of the underlying hardware and abstract them for scientific users. Running effectively on remote specialized hardware requires transparent workflow systems. Comprehending the petascale data sets generated in such simulations requires automated tools for data exploration and visualization. Archiving and sharing access to this data within the inevitably distributed

  9. SciDAC advances and applications in computational beam dynamics

    International Nuclear Information System (INIS)

    Ryne, R; Abell, D; Adelmann, A; Amundson, J; Bohn, C; Cary, J; Colella, P; Dechow, D; Decyk, V; Dragt, A; Gerber, R; Habib, S; Higdon, D; Katsouleas, T; Ma, K-L; McCorquodale, P; Mihalcea, D; Mitchell, C; Mori, W; Mottershead, C T; Neri, F; Pogorelov, I; Qiang, J; Samulyak, R; Serafini, D; Shalf, J; Siegerist, C; Spentzouris, P; Stoltz, P; Terzic, B; Venturini, M; Walstrom, P

    2005-01-01

    SciDAC has had a major impact on computational beam dynamics and the design of particle accelerators. Particle accelerators-which account for half of the facilities in the DOE Office of Science Facilities for the Future of Science 20 Year Outlook-are crucial for US scientific, industrial, and economic competitiveness. Thanks to SciDAC, accelerator design calculations that were once thought impossible are now carried routinely, and new challenging and important calculations are within reach. SciDAC accelerator modeling codes are being used to get the most science out of existing facilities, to produce optimal designs for future facilities, and to explore advanced accelerator concepts that may hold the key to qualitatively new ways of accelerating charged particle beams. In this paper we present highlights from the SciDAC Accelerator Science and Technology (AST) project Beam Dynamics focus area in regard to algorithm development, software development, and applications

  10. SciDAC Advances and Applications in Computational Beam Dynamics

    International Nuclear Information System (INIS)

    Ryne, R.; Abell, D.; Adelmann, A.; Amundson, J.; Bohn, C.; Cary, J.; Colella, P.; Dechow, D.; Decyk, V.; Dragt, A.; Gerber, R.; Habib, S.; Higdon, D.; Katsouleas, T.; Ma, K.-L.; McCorquodale, P.; Mihalcea, D.; Mitchell, C.; Mori, W.; Mottershead, C.T.; Neri, F.; Pogorelov, I.; Qiang, J.; Samulyak, R.; Serafini, D.; Shalf, J.; Siegerist, C.; Spentzouris, P.; Stoltz, P.; Terzic, B.; Venturini, M.; Walstrom, P.

    2005-01-01

    SciDAC has had a major impact on computational beam dynamics and the design of particle accelerators. Particle accelerators--which account for half of the facilities in the DOE Office of Science Facilities for the Future of Science 20 Year Outlook--are crucial for US scientific, industrial, and economic competitiveness. Thanks to SciDAC, accelerator design calculations that were once thought impossible are now carried routinely, and new challenging and important calculations are within reach. SciDAC accelerator modeling codes are being used to get the most science out of existing facilities, to produce optimal designs for future facilities, and to explore advanced accelerator concepts that may hold the key to qualitatively new ways of accelerating charged particle beams. In this poster we present highlights from the SciDAC Accelerator Science and Technology (AST) project Beam Dynamics focus area in regard to algorithm development, software development, and applications

  11. Preface: SciDAC 2008

    Science.gov (United States)

    Stevens, Rick

    2008-07-01

    far exceeded available systems; and in 2003, the Office of Science identified increasing computing capability by a factor of 100 as the second priority on its Facilities of the Future list. The goal was to establish leadership-class computing resources to support open science. As a result of a peer reviewed competition, the first leadership computing facility was established at Oak Ridge National Laboratory in 2004. A second leadership computing facility was established at Argonne National Laboratory in 2006. This expansion of computational resources led to a corresponding expansion of the INCITE program. In 2008, Argonne, Lawrence Berkeley, Oak Ridge, and Pacific Northwest national laboratories all provided resources for INCITE. By awarding large blocks of computer time on the DOE leadership computing facilities, the INCITE program enables the largest-scale computations to be pursued. In 2009, INCITE will award over half a billion node-hours of time. The SciDAC conference celebrates progress in advancing science through large-scale modeling and simulation. Over 350 participants attended this year's talks, poster sessions, and tutorials, spanning the disciplines supported by DOE. While the principal focus was on SciDAC accomplishments, this year's conference also included invited presentations and posters from DOE INCITE awardees. Another new feature in the SciDAC conference series was an electronic theater and video poster session, which provided an opportunity for the community to see over 50 scientific visualizations in a venue equipped with many high-resolution large-format displays. To highlight the growing international interest in petascale computing, this year's SciDAC conference included a keynote presentation by Herman Lederer from the Max Planck Institut, one of the leaders of DEISA (Distributed European Infrastructure for Supercomputing Applications) project and a member of the PRACE consortium, Europe's main petascale project. We also heard excellent

  12. Scientific Discovery through Advanced Computing (SciDAC-3) Partnership Project Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, Forest M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bochev, Pavel B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Cameron-Smith, Philip J.. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Easter, Richard C [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Elliott, Scott M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Ghan, Steven J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Liu, Xiaohong [Univ. of Wyoming, Laramie, WY (United States); Lowrie, Robert B. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Lucas, Donald D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ma, Po-lun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sacks, William J. [National Center for Atmospheric Research (NCAR), Boulder, CO (United States); Shrivastava, Manish [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Singh, Balwinder [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tautges, Timothy J. [Argonne National Lab. (ANL), Argonne, IL (United States); Taylor, Mark A. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Vertenstein, Mariana [National Center for Atmospheric Research (NCAR), Boulder, CO (United States); Worley, Patrick H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2014-01-15

    The Applying Computationally Efficient Schemes for BioGeochemical Cycles ACES4BGC Project is advancing the predictive capabilities of Earth System Models (ESMs) by reducing two of the largest sources of uncertainty, aerosols and biospheric feedbacks, with a highly efficient computational approach. In particular, this project is implementing and optimizing new computationally efficient tracer advection algorithms for large numbers of tracer species; adding important biogeochemical interactions between the atmosphere, land, and ocean models; and applying uncertainty quanti cation (UQ) techniques to constrain process parameters and evaluate uncertainties in feedbacks between biogeochemical cycles and the climate system.

  13. Results of the PERI survey of SciDAC applications

    International Nuclear Information System (INIS)

    Supinski, Bronis R de; Hollingworth, Jeffrey K; Moore, Shirley; Worley, Patrick H

    2007-01-01

    The Performance Engineering Research Institute (PERI) project focuses on achieving superior performance for Scientific Discovery through Advanced Computing (SciDAC) applications on leadership class machines through cutting-edge research in performance modeling and automated performance tuning. This focus requires coordinated activities to engage SciDAC application teams. The initial application engagement activity was a survey of these teams to determine their performance goals, the criticality of those goals, current performance of their applications, application characteristics relevant to performance and their plans for future optimization. Using a web-based questionnaire, PERI researchers have worked with application developers to provide this information for over twenty-five applications. This paper describes the initial analysis of the application characteristics and performance goals, as well as current and future application engagement activities driven by these results. While the survey was conducted primarily to meet PERI needs, the results represent a snapshot of the state of SciDAC code development and may be of use to the DOE community at large. Overall, the results show that SciDAC application teams are engaged in significant new code development, which will require flexible performance optimization techniques that can improve performance as the applications evolve

  14. Preface: SciDAC 2006

    Science.gov (United States)

    Tang, William M., Dr.

    2006-01-01

    The second annual Scientific Discovery through Advanced Computing (SciDAC) Conference was held from June 25-29, 2006 at the new Hyatt Regency Hotel in Denver, Colorado. This conference showcased outstanding SciDAC-sponsored computational science results achieved during the past year across many scientific domains, with an emphasis on science at scale. Exciting computational science that has been accomplished outside of the SciDAC program both nationally and internationally was also featured to help foster communication between SciDAC computational scientists and those funded by other agencies. This was illustrated by many compelling examples of how domain scientists collaborated productively with applied mathematicians and computer scientists to effectively take advantage of terascale computers (capable of performing trillions of calculations per second) not only to accelerate progress in scientific discovery in a variety of fields but also to show great promise for being able to utilize the exciting petascale capabilities in the near future. The SciDAC program was originally conceived as an interdisciplinary computational science program based on the guiding principle that strong collaborative alliances between domain scientists, applied mathematicians, and computer scientists are vital to accelerated progress and associated discovery on the world's most challenging scientific problems. Associated verification and validation are essential in this successful program, which was funded by the US Department of Energy Office of Science (DOE OS) five years ago. As is made clear in many of the papers in these proceedings, SciDAC has fundamentally changed the way that computational science is now carried out in response to the exciting challenge of making the best use of the rapid progress in the emergence of more and more powerful computational platforms. In this regard, Dr. Raymond Orbach, Energy Undersecretary for Science at the DOE and Director of the OS has stated

  15. Opening Comments: SciDAC 2008

    Science.gov (United States)

    Strayer, Michael

    2008-07-01

    teraflop/s center at NERSC and that had to be shared with the programmatic side supporting research across DOE. At the time, ESnet was just slightly over half a gig per sec of bandwidth; and the science being addressed was accelerator science, climate, chemistry, fusion, astrophysics, materials science, and QCD. We built out the national collaboratories from the ASCR office, and in addition we built Integrated Software Infrastructure Centers (ISICs). Of these, three were in applied mathematics, four in computer science (including a performance evaluation research center), and four were collaboratories or Grid projects having to do with data management. For science, there were remarkable breakthroughs in simulation, such as full 3D laboratory scale flame simulation. There were also significant improvements in application codes - from factors of almost 3 to more than 100 - and code improvement as people began to realize they had to integrate mathematics tools and computer science tools into their codes to take advantage of the parallelism of the day. The SciDAC data-mining tool, Sapphire, received a 2006 R&D 100 award. And the community as a whole worked well together and began building a publication record that was substantial. In 2006, we recompeted the program with similar goals - SciDAC-1 was very successful, and we wanted to continue that success and extend what was happening under SciDAC to the broader science community. We opened up the partnership to all of the Offices of Science and the NSF and the NNSA. The goal was to create comprehensive scientific computing software and the infrastructure for the software to enable scientific discovery in the physical, biological, and environmental sciences and take the simulations to an extreme scale, in this case petascale. We would also build out a new generation of data management tools. What we observed during SciDAC-1 was that the data and the data communities - both experimental data from large experimental facilities and

  16. Preface: SciDAC 2005

    Science.gov (United States)

    Mezzacappa, Anthony

    2005-01-01

    On 26-30 June 2005 at the Grand Hyatt on Union Square in San Francisco several hundred computational scientists from around the world came together for what can certainly be described as a celebration of computational science. Scientists from the SciDAC Program and scientists from other agencies and nations were joined by applied mathematicians and computer scientists to highlight the many successes in the past year where computation has led to scientific discovery in a variety of fields: lattice quantum chromodynamics, accelerator modeling, chemistry, biology, materials science, Earth and climate science, astrophysics, and combustion and fusion energy science. Also highlighted were the advances in numerical methods and computer science, and the multidisciplinary collaboration cutting across science, mathematics, and computer science that enabled these discoveries. The SciDAC Program was conceived and funded by the US Department of Energy Office of Science. It is the Office of Science's premier computational science program founded on what is arguably the perfect formula: the priority and focus is science and scientific discovery, with the understanding that the full arsenal of `enabling technologies' in applied mathematics and computer science must be brought to bear if we are to have any hope of attacking and ultimately solving today's computational Grand Challenge problems. The SciDAC Program has been in existence for four years, and many of the computational scientists funded by this program will tell you that the program has given them the hope of addressing their scientific problems in full realism for the very first time. Many of these scientists will also tell you that SciDAC has also fundamentally changed the way they do computational science. We begin this volume with one of DOE's great traditions, and core missions: energy research. As we will see, computation has been seminal to the critical advances that have been made in this arena. Of course, to

  17. A NATIONAL COLLABORATORY TO ADVANCE THE SCIENCE OF HIGH TEMPERATURE PLASMA PHYSICS FOR MAGNETIC FUSION

    Energy Technology Data Exchange (ETDEWEB)

    Allen R. Sanderson; Christopher R. Johnson

    2006-08-01

    This report summarizes the work of the University of Utah, which was a member of the National Fusion Collaboratory (NFC) Project funded by the United States Department of Energy (DOE) under the Scientific Discovery through Advanced Computing Program (SciDAC) to develop a persistent infrastructure to enable scientific collaboration for magnetic fusion research. A five year project that was initiated in 2001, it the NFC built on the past collaborative work performed within the U.S. fusion community and added the component of computer science research done with the USDOE Office of Science, Office of Advanced Scientific Computer Research. The project was itself a collaboration, itself uniting fusion scientists from General Atomics, MIT, and PPPL and computer scientists from ANL, LBNL, and Princeton University, and the University of Utah to form a coordinated team. The group leveraged existing computer science technology where possible and extended or created new capabilities where required. The complete finial report is attached as an addendum. The In the collaboration, the primary technical responsibility of the University of Utah in the collaboration was to develop and deploy an advanced scientific visualization service. To achieve this goal, the SCIRun Problem Solving Environment (PSE) is used on FusionGrid for an advanced scientific visualization service. SCIRun is open source software that gives the user the ability to create complex 3D visualizations and 2D graphics. This capability allows for the exploration of complex simulation results and the comparison of simulation and experimental data. SCIRun on FusionGrid gives the scientist a no-license-cost visualization capability that rivals present day commercial visualization packages. To accelerate the usage of SCIRun within the fusion community, a stand-alone application built on top of SCIRun was developed and deployed. This application, FusionViewer, allows users who are unfamiliar with SCIRun to quickly create

  18. A National Collaboratory To Advance The Science Of High Temperature Plasma Physics For Magnetic Fusion

    International Nuclear Information System (INIS)

    Sanderson, Allen R.; Johnson, Christopher R.

    2006-01-01

    This report summarizes the work of the University of Utah, which was a member of the National Fusion Collaboratory (NFC) Project funded by the United States Department of Energy (DOE) under the Scientific Discovery through Advanced Computing Program (SciDAC) to develop a persistent infrastructure to enable scientific collaboration for magnetic fusion research. A five year project that was initiated in 2001, it the NFC built on the past collaborative work performed within the U.S. fusion community and added the component of computer science research done with the USDOE Office of Science, Office of Advanced Scientific Computer Research. The project was itself a collaboration, itself uniting fusion scientists from General Atomics, MIT, and PPPL and computer scientists from ANL, LBNL, and Princeton University, and the University of Utah to form a coordinated team. The group leveraged existing computer science technology where possible and extended or created new capabilities where required. The complete finial report is attached as an addendum. The In the collaboration, the primary technical responsibility of the University of Utah in the collaboration was to develop and deploy an advanced scientific visualization service. To achieve this goal, the SCIRun Problem Solving Environment (PSE) is used on FusionGrid for an advanced scientific visualization service. SCIRun is open source software that gives the user the ability to create complex 3D visualizations and 2D graphics. This capability allows for the exploration of complex simulation results and the comparison of simulation and experimental data. SCIRun on FusionGrid gives the scientist a no-license-cost visualization capability that rivals present day commercial visualization packages. To accelerate the usage of SCIRun within the fusion community, a stand-alone application built on top of SCIRun was developed and deployed. This application, FusionViewer, allows users who are unfamiliar with SCIRun to quickly create

  19. OPENING REMARKS: SciDAC: Scientific Discovery through Advanced Computing

    Science.gov (United States)

    Strayer, Michael

    2005-01-01

    with industry and virtual prototyping. New instruments of collaboration will include institutes and centers while summer schools, workshops and outreach will invite new talent and expertise. Computational science adds new dimensions to science and its practice. Disciplines of fusion, accelerator science, and combustion are poised to blur the boundaries between pure and applied science. As we open the door into FY2006 we shall see a landscape of new scientific challenges: in biology, chemistry, materials, and astrophysics to name a few. The enabling technologies of SciDAC have been transformational as drivers of change. Planning for major new software systems assumes a base line employing Common Component Architectures and this has become a household word for new software projects. While grid algorithms and mesh refinement software have transformed applications software, data management and visualization have transformed our understanding of science from data. The Gordon Bell prize now seems to be dominated by computational science and solvers developed by TOPS ISIC. The priorities of the Office of Science in the Department of Energy are clear. The 20 year facilities plan is driven by new science. High performance computing is placed amongst the two highest priorities. Moore's law says that by the end of the next cycle of SciDAC we shall have peta-flop computers. The challenges of petascale computing are enormous. These and the associated computational science are the highest priorities for computing within the Office of Science. Our effort in Leadership Class computing is just a first step towards this goal. Clearly, computational science at this scale will face enormous challenges and possibilities. Performance evaluation and prediction will be critical to unraveling the needed software technologies. We must not lose sight of our overarching goal—that of scientific discovery. Science does not stand still and the landscape of science discovery and computing holds

  20. Opening Remarks: SciDAC 2007

    Science.gov (United States)

    Strayer, Michael

    2007-09-01

    Good morning. Welcome to Boston, the home of the Red Sox, Celtics and Bruins, baked beans, tea parties, Robert Parker, and SciDAC 2007. A year ago I stood before you to share the legacy of the first SciDAC program and identify the challenges that we must address on the road to petascale computing—a road E E Cummins described as `. . . never traveled, gladly beyond any experience.' Today, I want to explore the preparations for the rapidly approaching extreme scale (X-scale) generation. These preparations are the first step propelling us along the road of burgeoning scientific discovery enabled by the application of X- scale computing. We look to petascale computing and beyond to open up a world of discovery that cuts across scientific fields and leads us to a greater understanding of not only our world, but our universe. As part of the President's America Competitiveness Initiative, the ASCR Office has been preparing a ten year vision for computing. As part of this planning the LBNL together with ORNL and ANL hosted three town hall meetings on Simulation and Modeling at the Exascale for Energy, Ecological Sustainability and Global Security (E3). The proposed E3 initiative is organized around four programmatic themes: Engaging our top scientists, engineers, computer scientists and applied mathematicians; investing in pioneering large-scale science; developing scalable analysis algorithms, and storage architectures to accelerate discovery; and accelerating the build-out and future development of the DOE open computing facilities. It is clear that we have only just started down the path to extreme scale computing. Plan to attend Thursday's session on the out-briefing and discussion of these meetings. The road to the petascale has been at best rocky. In FY07, the continuing resolution provided 12% less money for Advanced Scientific Computing than either the President, the Senate, or the House. As a consequence, many of you had to absorb a no cost extension for your

  1. SciDAC Center for Gyrokinetic Particle Simulation of Turbulent Transport in Burning Plasmas

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Zhihong [Univ. of California, Irvine, CA (United States)

    2013-12-18

    During the first year of the SciDAC gyrokinetic particle simulation (GPS) project, the GPS team (Zhihong Lin, Liu Chen, Yasutaro Nishimura, and Igor Holod) at the University of California, Irvine (UCI) studied the tokamak electron transport driven by electron temperature gradient (ETG) turbulence, and by trapped electron mode (TEM) turbulence and ion temperature gradient (ITG) turbulence with kinetic electron effects, extended our studies of ITG turbulence spreading to core-edge coupling. We have developed and optimized an elliptic solver using finite element method (FEM), which enables the implementation of advanced kinetic electron models (split-weight scheme and hybrid model) in the SciDAC GPS production code GTC. The GTC code has been ported and optimized on both scalar and vector parallel computer architectures, and is being transformed into objected-oriented style to facilitate collaborative code development. During this period, the UCI team members presented 11 invited talks at major national and international conferences, published 22 papers in peer-reviewed journals and 10 papers in conference proceedings. The UCI hosted the annual SciDAC Workshop on Plasma Turbulence sponsored by the GPS Center, 2005-2007. The workshop was attended by about fifties US and foreign researchers and financially sponsored several gradual students from MIT, Princeton University, Germany, Switzerland, and Finland. A new SciDAC postdoc, Igor Holod, has arrived at UCI to initiate global particle simulation of magnetohydrodynamics turbulence driven by energetic particle modes. The PI, Z. Lin, has been promoted to the Associate Professor with tenure at UCI.

  2. A National Collaboratory to Advance the Science of High Temperature Plasma Physics for Magnetic Fusion

    International Nuclear Information System (INIS)

    Schissel, D.P.; Abla, G.; Burruss, J.R.; Feibush, E.; Fredian, T.W.; Goode, M.M.; Greenwald, M.J.; Keahey, K.; Leggett, T.; Li, K.; McCune, D.C.; Papka, M.E.; Randerson, L.; Sanderson, A.; Stillerman, J.; Thompson, M.R.; Uram, T.; Wallace, G.

    2006-01-01

    This report summarizes the work of the National Fusion Collaboratory (NFC) Project funded by the United States Department of Energy (DOE) under the Scientific Discovery through Advanced Computing Program (SciDAC) to develop a persistent infrastructure to enable scientific collaboration for magnetic fusion research. A five year project that was initiated in 2001, it built on the past collaborative work performed within the U.S. fusion community and added the component of computer science research done with the USDOE Office of Science, Office of Advanced Scientific Computer Research. The project was a collaboration itself uniting fusion scientists from General Atomics, MIT, and PPPL and computer scientists from ANL, LBNL, Princeton University, and the University of Utah to form a coordinated team. The group leveraged existing computer science technology where possible and extended or created new capabilities where required. Developing a reliable energy system that is economically and environmentally sustainable is the long-term goal of Fusion Energy Science (FES) research. In the U.S., FES experimental research is centered at three large facilities with a replacement value of over $1B. As these experiments have increased in size and complexity, there has been a concurrent growth in the number and importance of collaborations among large groups at the experimental sites and smaller groups located nationwide. Teaming with the experimental community is a theoretical and simulation community whose efforts range from applied analysis of experimental data to fundamental theory (e.g., realistic nonlinear 3D plasma models) that run on massively parallel computers. Looking toward the future, the large-scale experiments needed for FES research are staffed by correspondingly large, globally dispersed teams. The fusion program will be increasingly oriented toward the International Thermonuclear Experimental Reactor (ITER) where even now, a decade before operation begins, a large

  3. Opening Comments: SciDAC 2009

    Science.gov (United States)

    Strayer, Michael

    2009-07-01

    Welcome to San Diego and the 2009 SciDAC conference. Over the next four days, I would like to present an assessment of the SciDAC program. We will look at where we've been, how we got to where we are and where we are going in the future. Our vision is to be first in computational science, to be best in class in modeling and simulation. When Ray Orbach asked me what I would do, in my job interview for the SciDAC Director position, I said we would achieve that vision. And with our collective dedicated efforts, we have managed to achieve this vision. In the last year, we have now the most powerful supercomputer for open science, Jaguar, the Cray XT system at the Oak Ridge Leadership Computing Facility (OLCF). We also have NERSC, probably the best-in-the-world program for productivity in science that the Office of Science so depends on. And the Argonne Leadership Computing Facility offers architectural diversity with its IBM Blue Gene/P system as a counterbalance to Oak Ridge. There is also ESnet, which is often understated—the 40 gigabit per second dual backbone ring that connects all the labs and many DOE sites. In the President's Recovery Act funding, there is exciting news that ESnet is going to build out to a 100 gigabit per second network using new optical technologies. This is very exciting news for simulations and large-scale scientific facilities. But as one noted SciDAC luminary said, it's not all about the computers—it's also about the science—and we are also achieving our vision in this area. Together with having the fastest supercomputer for science, at the SC08 conference, SciDAC researchers won two ACM Gordon Bell Prizes for the outstanding performance of their applications. The DCA++ code, which solves some very interesting problems in materials, achieved a sustained performance of 1.3 petaflops, an astounding result and a mark I suspect will last for some time. The LS3DF application for studying nanomaterials also required the development of a

  4. Final Report- "An Algorithmic and Software Framework for Applied Partial Differential Equations (APDEC): A DOE SciDAC Integrated Software Infrastructure Center (ISIC)

    Energy Technology Data Exchange (ETDEWEB)

    Elbridge Gerry Puckett

    2008-05-13

    this he had been a Deputy Section Head at the National Center for Atmospheric Research in Colorado. My understanding is that Chris Algieri is the first person that Bill hired after coming to LBNL. The plan is that Chris Algieri will finish his PhD thesis while employed as a staff scientist in Bill's group. Both Sarah and Chris were supported in part with funds from DE-FC02-01ER25473. In Sarah's case she received support both while at U.C. Davis (UCD) taking classes and writing an MS thesis and during some of the time she was living in Berkeley, working at LBNL and finishing her PhD thesis. In Chris' case he was at U.C. Davis during the entire time he received support from DE-FC02-01ER25473. More specific details of their work are included in the report below. Finally my own research conducted under the auspices of DE-FC02-01ER25473 either involved direct collaboration with researchers at LBNL - Phil Colella and Peter Schwartz who is a member of Phil's Applied Numerical Algorithms Group - or was on problems that are closely related to research that has been and continues to be conducted by researchers at LBNL. Specific details of this work can be found below. Finally, I would like to note that the work conducted by my students and me under the auspices of this contract is closely related to work that I have performed with funding from my DOE MICS contract DE-FC02-03ER25579 'Development of High-Order Accurate Interface Tracking Algorithms and Improved Constitutive Models for Problems in Continuum Mechanics with Applications to Jetting' and with my CoPI on that grant Professor Greg Miller of the Department of Applied Science at UCD. In theory I tried to use funds from the SciDAC grant DE-FC02-01ER25473 to support work that directly involved implementing algorithms developed by my research group at U.C. Davis in software that was developed and is maintained by my SciDAC CoPI's at LBNL.

  5. Extraordinary tools for extraordinary science: the impact of SciDAC on accelerator science and technology

    Science.gov (United States)

    Ryne, Robert D.

    2006-09-01

    Particle accelerators are among the most complex and versatile instruments of scientific exploration. They have enabled remarkable scientific discoveries and important technological advances that span all programs within the DOE Office of Science (DOE/SC). The importance of accelerators to the DOE/SC mission is evident from an examination of the DOE document, ''Facilities for the Future of Science: A Twenty-Year Outlook.'' Of the 28 facilities listed, 13 involve accelerators. Thanks to SciDAC, a powerful suite of parallel simulation tools has been developed that represent a paradigm shift in computational accelerator science. Simulations that used to take weeks or more now take hours, and simulations that were once thought impossible are now performed routinely. These codes have been applied to many important projects of DOE/SC including existing facilities (the Tevatron complex, the Relativistic Heavy Ion Collider), facilities under construction (the Large Hadron Collider, the Spallation Neutron Source, the Linac Coherent Light Source), and to future facilities (the International Linear Collider, the Rare Isotope Accelerator). The new codes have also been used to explore innovative approaches to charged particle acceleration. These approaches, based on the extremely intense fields that can be present in lasers and plasmas, may one day provide a path to the outermost reaches of the energy frontier. Furthermore, they could lead to compact, high-gradient accelerators that would have huge consequences for US science and technology, industry, and medicine. In this talk I will describe the new accelerator modeling capabilities developed under SciDAC, the essential role of multi-disciplinary collaboration with applied mathematicians, computer scientists, and other IT experts in developing these capabilities, and provide examples of how the codes have been used to support DOE/SC accelerator projects.

  6. Extraordinary tools for extraordinary science: the impact of SciDAC on accelerator science and technology

    International Nuclear Information System (INIS)

    Ryne, Robert D

    2006-01-01

    Particle accelerators are among the most complex and versatile instruments of scientific exploration. They have enabled remarkable scientific discoveries and important technological advances that span all programs within the DOE Office of Science (DOE/SC). The importance of accelerators to the DOE/SC mission is evident from an examination of the DOE document, 'Facilities for the Future of Science: A Twenty-Year Outlook'. Of the 28 facilities listed, 13 involve accelerators. Thanks to SciDAC, a powerful suite of parallel simulation tools has been developed that represent a paradigm shift in computational accelerator science. Simulations that used to take weeks or more now take hours, and simulations that were once thought impossible are now performed routinely. These codes have been applied to many important projects of DOE/SC including existing facilities (the Tevatron complex, the Relativistic Heavy Ion Collider), facilities under construction (the Large Hadron Collider, the Spallation Neutron Source, the Linac Coherent Light Source), and to future facilities (the International Linear Collider, the Rare Isotope Accelerator). The new codes have also been used to explore innovative approaches to charged particle acceleration. These approaches, based on the extremely intense fields that can be present in lasers and plasmas, may one day provide a path to the outermost reaches of the energy frontier. Furthermore, they could lead to compact, high-gradient accelerators that would have huge consequences for US science and technology, industry, and medicine. In this talk I will describe the new accelerator modeling capabilities developed under SciDAC, the essential role of multi-disciplinary collaboration with applied mathematicians, computer scientists, and other IT experts in developing these capabilities, and provide examples of how the codes have been used to support DOE/SC accelerator projects

  7. Extraordinary Tools for Extraordinary Science: The Impact of SciDAC on Accelerator Science and Technology

    International Nuclear Information System (INIS)

    Ryne, Robert D.

    2006-01-01

    Particle accelerators are among the most complex and versatile instruments of scientific exploration. They have enabled remarkable scientific discoveries and important technological advances that span all programs within the DOE Office of Science (DOE/SC). The importance of accelerators to the DOE/SC mission is evident from an examination of the DOE document, ''Facilities for the Future of Science: A Twenty-Year Outlook''. Of the 28 facilities listed, 13 involve accelerators. Thanks to SciDAC, a powerful suite of parallel simulation tools has been developed that represent a paradigm shift in computational accelerator science. Simulations that used to take weeks or more now take hours, and simulations that were once thought impossible are now performed routinely. These codes have been applied to many important projects of DOE/SC including existing facilities (the Tevatron complex, the Relativistic Heavy Ion Collider), facilities under construction (the Large Hadron Collider, the Spallation Neutron Source, the Linac Coherent Light Source), and to future facilities (the International Linear Collider, the Rare Isotope Accelerator). The new codes have also been used to explore innovative approaches to charged particle acceleration. These approaches, based on the extremely intense fields that can be present in lasers and plasmas, may one day provide a path to the outermost reaches of the energy frontier. Furthermore, they could lead to compact, high-gradient accelerators that would have huge consequences for US science and technology, industry, and medicine. In this talk I will describe the new accelerator modeling capabilities developed under SciDAC, the essential role of multi-disciplinary collaboration with applied mathematicians, computer scientists, and other IT experts in developing these capabilities, and provide examples of how the codes have been used to support DOE/SC accelerator projects

  8. A National Collaboratory to Advance the Science of High Temperature Plasma Physics for Magnetic Fusion

    Energy Technology Data Exchange (ETDEWEB)

    Schissel, David P. [Princeton Plasma Physics Lab., NJ (United States); Abla, G. [Princeton Plasma Physics Lab., NJ (United States); Burruss, J. R. [Princeton Plasma Physics Lab., NJ (United States); Feibush, E. [Princeton Plasma Physics Lab., NJ (United States); Fredian, T. W. [Massachusetts Institute of Technology, Cambridge, MA (United States); Goode, M. M. [Lawrence Berkeley National Lab., CA (United States); Greenwald, M. J. [Massachusetts Institute of Technology, Cambridge, MA (United States); Keahey, K. [Argonne National Lab., IL (United States); Leggett, T. [Argonne National Lab., IL (United States); Li, K. [Princeton Univ., NJ (United States); McCune, D. C. [Princeton Plasma Physics Lab., NJ (United States); Papka, M. E. [Argonne National Lab., IL (United States); Randerson, L. [Princeton Plasma Physics Lab., NJ (United States); Sanderson, A. [Univ. of Utah, Salt Lake City, UT (United States); Stillerman, J. [Massachusetts Institute of Technology, Cambridge, MA (United States); Thompson, M. R. [Lawrence Berkeley National Lab., CA (United States); Uram, T. [Argonne National Lab., IL (United States); Wallace, G. [Princeton Univ., NJ (United States)

    2012-12-20

    This report summarizes the work of the National Fusion Collaboratory (NFC) Project to develop a persistent infrastructure to enable scientific collaboration for magnetic fusion research. The original objective of the NFC project was to develop and deploy a national FES Grid (FusionGrid) that would be a system for secure sharing of computation, visualization, and data resources over the Internet. The goal of FusionGrid was to allow scientists at remote sites to participate as fully in experiments and computational activities as if they were working on site thereby creating a unified virtual organization of the geographically dispersed U.S. fusion community. The vision for FusionGrid was that experimental and simulation data, computer codes, analysis routines, visualization tools, and remote collaboration tools are to be thought of as network services. In this model, an application service provider (ASP provides and maintains software resources as well as the necessary hardware resources. The project would create a robust, user-friendly collaborative software environment and make it available to the US FES community. This Grid's resources would be protected by a shared security infrastructure including strong authentication to identify users and authorization to allow stakeholders to control their own resources. In this environment, access to services is stressed rather than data or software portability.

  9. SECAD-- a Schema-based Environment for Configuring, Analyzing and Documenting Integrated Fusion Simulations. Final report

    International Nuclear Information System (INIS)

    Shasharina, Svetlana

    2012-01-01

    SECAD is a project that developed a GUI for running integrated fusion simulations as implemented in FACETS and SWIM SciDAC projects. Using the GUI users can submit simulations locally and remotely and visualize the simulation results

  10. Sustaining and Extending the Open Science Grid: Science Innovation on a PetaScale Nationwide Facility (DE-FC02-06ER41436) SciDAC-2 Closeout Report

    Energy Technology Data Exchange (ETDEWEB)

    Livny, Miron [Univ. of Wisconsin, Madison, WI (United States); Shank, James [Boston Univ., MA (United States); Ernst, Michael [Brookhaven National Lab. (BNL), Upton, NY (United States); Blackburn, Kent [California Inst. of Technology (CalTech), Pasadena, CA (United States); Goasguen, Sebastien [Clemson Univ., SC (United States); Tuts, Michael [Columbia Univ., New York, NY (United States); Gibbons, Lawrence [Cornell Univ., Ithaca, NY (United States); Pordes, Ruth [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Sliz, Piotr [Harvard Medical School, Boston, MA (United States); Deelman, Ewa [Univ. of Southern California, Los Angeles, CA (United States). Information Sciences Inst.; Barnett, William [Indiana Univ., Bloomington, IN (United States); Olson, Doug [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); McGee, John [Univ. of North Carolina, Chapel Hill, NC (United States). Renaissance Computing Inst.; Cowles, Robert [SLAC National Accelerator Lab., Menlo Park, CA (United States); Wuerthwein, Frank [Univ. of California, San Diego, CA (United States); Gardner, Robert [Univ. of Chicago, IL (United States); Avery, Paul [Univ. of Florida, Gainesville, FL (United States); Wang, Shaowen [Univ. of Illinois, Champaign, IL (United States); Univ. of Iowa, Iowa City, IA (United States); Lincoln, David Swanson [Univ. of Nebraska, Lincoln, NE (United States)

    2015-02-11

    Under this SciDAC-2 grant the project’s goal w a s t o stimulate new discoveries by providing scientists with effective and dependable access to an unprecedented national distributed computational facility: the Open Science Grid (OSG). We proposed to achieve this through the work of the Open Science Grid Consortium: a unique hands-on multi-disciplinary collaboration of scientists, software developers and providers of computing resources. Together the stakeholders in this consortium sustain and use a shared distributed computing environment that transforms simulation and experimental science in the US. The OSG consortium is an open collaboration that actively engages new research communities. We operate an open facility that brings together a broad spectrum of compute, storage, and networking resources and interfaces to other cyberinfrastructures, including the US XSEDE (previously TeraGrid), the European Grids for ESciencE (EGEE), as well as campus and regional grids. We leverage middleware provided by computer science groups, facility IT support organizations, and computing programs of application communities for the benefit of consortium members and the US national CI.

  11. SciDAC GSEP: Gyrokinetic Simulation of Energetic Particle Turbulence and Transport

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Zhihong [Univ. of California, Irvine, CA (United States)

    2017-12-30

    Energetic particle (EP) confinement is a key physics issue for burning plasma experiment ITER, the crucial next step in the quest for clean and abundant energy, since ignition relies on self-heating by energetic fusion products (α-particles). Due to the strong coupling of EP with burning thermal plasmas, plasma confinement property in the ignition regime is one of the most uncertain factors when extrapolating from existing fusion devices to the ITER tokamak. EP population in current tokamaks are mostly produced by auxiliary heating such as neutral beam injection (NBI) and radio frequency (RF) heating. Remarkable progress in developing comprehensive EP simulation codes and understanding basic EP physics has been made by two concurrent SciDAC EP projects GSEP funded by the Department of Energy (DOE) Office of Fusion Energy Science (OFES), which have successfully established gyrokinetic turbulence simulation as a necessary paradigm shift for studying the EP confinement in burning plasmas. Verification and validation have rapidly advanced through close collaborations between simulation, theory, and experiment. Furthermore, productive collaborations with computational scientists have enabled EP simulation codes to effectively utilize current petascale computers and emerging exascale computers. We review here key physics progress in the GSEP projects regarding verification and validation of gyrokinetic simulations, nonlinear EP physics, EP coupling with thermal plasmas, and reduced EP transport models. Advances in high performance computing through collaborations with computational scientists that enable these large scale electromagnetic simulations are also highlighted. These results have been widely disseminated in numerous peer-reviewed publications including many Phys. Rev. Lett. papers and many invited presentations at prominent fusion conferences such as the biennial International Atomic Energy Agency (IAEA) Fusion Energy Conference and the annual meeting of the

  12. Performance Engineering Research Institute SciDAC-2 Enabling Technologies Institute Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Mary [University of Utah

    2014-09-19

    Enhancing the performance of SciDAC applications on petascale systems has high priority within DOE SC. As we look to the future, achieving expected levels of performance on high-end com-puting (HEC) systems is growing ever more challenging due to enormous scale, increasing archi-tectural complexity, and increasing application complexity. To address these challenges, PERI has implemented a unified, tripartite research plan encompassing: (1) performance modeling and prediction; (2) automatic performance tuning; and (3) performance engineering of high profile applications. The PERI performance modeling and prediction activity is developing and refining performance models, significantly reducing the cost of collecting the data upon which the models are based, and increasing model fidelity, speed and generality. Our primary research activity is automatic tuning (autotuning) of scientific software. This activity is spurred by the strong user preference for automatic tools and is based on previous successful activities such as ATLAS, which has automatically tuned components of the LAPACK linear algebra library, and other re-cent work on autotuning domain-specific libraries. Our third major component is application en-gagement, to which we are devoting approximately 30% of our effort to work directly with Sci-DAC-2 applications. This last activity not only helps DOE scientists meet their near-term per-formance goals, but also helps keep PERI research focused on the real challenges facing DOE computational scientists as they enter the Petascale Era.

  13. A National Collaboratory to Advance the Science of High Temperature Plasma Physics for Magnetic Fusion

    International Nuclear Information System (INIS)

    Schissel, David P.; Abla, G.; Burruss, J. R.; Feibush, E.; Fredian, T. W.; Goode, M. M.; Greenwald, M. J.; Keahey, K.; Leggett, T.; Li, K.; McCune, D. C.; Papka, M. E.; Randerson, L.; Sanderson, A.; Stillerman, J.; Thompson, M. R.; Uram, T.; Wallace, G.

    2012-01-01

    This report summarizes the work of the National Fusion Collaboratory (NFC) Project to develop a persistent infrastructure to enable scientific collaboration for magnetic fusion research. The original objective of the NFC project was to develop and deploy a national FES Grid(FusionGrid) that would be a system for secure sharing of computation, visualization, and data resources over the Internet. The goal of FusionGrid was to allow scientists at remote sites to participate as fully in experiments and computational activities as if they were working on site thereby creating a unified virtual organization of the geographically dispersed U.S. fusion community. The vision for FusionGrid was that experimental and simulation data, computer codes, analysis routines, visualization tools, and remote collaboration tools are to be thought of as network services. In this model, an application service provider (ASP) provides and maintains software resources as well as the necessary hardware resources. The project would create a robust, user-friendly collaborative software environment and make it available to the US FES community. This Grid's resources would be protected by a shared security infrastructure including strong authentication to identify users and authorization to allow stakeholders to control their own resources. In this environment, access to services is stressed rather than data or software portability.

  14. PMEL contributions to the collaboration: SCALING THE EARTH SYSTEM GRID TO PETASCALE DATA for the DOE SciDACs Earth System Grid Center for Enabling Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Hankin, Steve

    2012-06-01

    Drawing to a close after five years of funding from DOE's ASCR and BER program offices, the SciDAC-2 project called the Earth System Grid (ESG) Center for Enabling Technologies has successfully established a new capability for serving data from distributed centers. The system enables users to access, analyze, and visualize data using a globally federated collection of networks, computers and software. The ESG software now known as the Earth System Grid Federation (ESGF) has attracted a broad developer base and has been widely adopted so that it is now being utilized in serving the most comprehensive multi-model climate data sets in the world. The system is used to support international climate model intercomparison activities as well as high profile U.S. DOE, NOAA, NASA, and NSF projects. It currently provides more than 25,000 users access to more than half a petabyte of climate data (from models and from observations) and has enabled over a 1,000 scientific publications.

  15. Lambda Station: Alternate network path forwarding for production SciDAC applications

    International Nuclear Information System (INIS)

    Grigoriev, Maxim; Bobyshev, Andrey; Crawford, Matt; DeMar, Phil; Grigaliunas, Vyto; Moibenko, Alexander; Petravick, Don; Newman, Harvey; Steenberg, Conrad; Thomas, Michael

    2007-01-01

    The LHC era will start very soon, creating immense data volumes capable of demanding allocation of an entire network circuit for task-driven applications. Circuit-based alternate network paths are one solution to meeting the LHC high bandwidth network requirements. The Lambda Station project is aimed at addressing growing requirements for dynamic allocation of alternate network paths. Lambda Station facilitates the rerouting of designated traffic through site LAN infrastructure onto so-called 'high-impact' wide-area networks. The prototype Lambda Station developed with Service Oriented Architecture (SOA) approach in mind will be presented. Lambda Station has been successfully integrated into the production version of the Storage Resource Manager (SRM), and deployed at US CMS Tier1 center at Fermilab, as well as at US-CMS Tier-2 site at Caltech. This paper will discuss experiences using the prototype system with production SciDAC applications for data movement between Fermilab and Caltech. The architecture and design principles of the production version Lambda Station software, currently being implemented as Java based web services, will also be presented in this paper

  16. Building a universal nuclear energy density functional

    International Nuclear Information System (INIS)

    Bertsch, G F

    2007-01-01

    This talk describes a new project in SciDAC II in the area of low-energy nuclear physics. The motivation and goals of the SciDAC are presented as well as an outline of the theoretical and computational methodology that will be employed. An important motivation is to have more accurate and reliable predictions of nuclear properties including their binding energies and low-energy reaction rates. The theoretical basis is provided by density functional theory, which the only available theory that can be systematically applied to all nuclei. However, other methodologies based on wave function methods are needed to refine the functionals and to make applications to dynamic processes

  17. Final Technical Report - SciDAC Cooperative Agreement: Center for Wave Interactions with Magnetohydrodynamics

    International Nuclear Information System (INIS)

    Schnack, Dalton D.

    2012-01-01

    Final technical report for research performed by Dr. Thomas G. Jenkins in collaboration with Professor Dalton D. Schnack on SciDAC Cooperative Agreement: Center for Wave Interactions with Magnetohydrodyanics, DE-FC02-06ER54899, for the period of 8/15/06 - 8/14/11. This report centers on the Slow MHD physics campaign work performed by Dr. Jenkins while at UW-Madison and then at Tech-X Corporation. To make progress on the problem of RF induced currents affect magnetic island evolution in toroidal plasmas, a set of research approaches are outlined. Three approaches can be addressed in parallel. These are: (1) Analytically prescribed additional term in Ohm's law to model the effect of localized ECCD current drive; (2) Introduce an additional evolution equation for the Ohm's law source term. Establish a RF source 'box' where information from the RF code couples to the fluid evolution; and (3) Carry out a more rigorous analytic calculation treating the additional RF terms in a closure problem. These approaches rely on the necessity of reinvigorating the computation modeling efforts of resistive and neoclassical tearing modes with present day versions of the numerical tools. For the RF community, the relevant action item is - RF ray tracing codes need to be modified so that general three-dimensional spatial information can be obtained. Further, interface efforts between the two codes require work as well as an assessment as to the numerical stability properties of the procedures to be used.

  18. COMPASS, the COMmunity Petascale project for Accelerator Science and Simulation, a board computational accelerator physics initiative

    International Nuclear Information System (INIS)

    Cary, J.R.; Spentzouris, P.; Amundson, J.; McInnes, L.; Borland, M.; Mustapha, B.; Ostroumov, P.; Wang, Y.; Fischer, W.; Fedotov, A.; Ben-Zvi, I.; Ryne, R.; Esarey, E.; Geddes, C.; Qiang, J.; Ng, E.; Li, S.; Ng, C.; Lee, R.; Merminga, L.; Wang, H.; Bruhwiler, D.L.; Dechow, D.; Mullowney, P.; Messmer, P.; Nieter, C.; Ovtchinnikov, S.; Paul, K.; Stoltz, P.; Wade-Stein, D.; Mori, W.B.; Decyk, V.; Huang, C.K.; Lu, W.; Tzoufras, M.; Tsung, F.; Zhou, M.; Werner, G.R.; Antonsen, T.; Katsouleas, T.; Morris, B.

    2007-01-01

    Accelerators are the largest and most costly scientific instruments of the Department of Energy, with uses across a broad range of science, including colliders for particle physics and nuclear science and light sources and neutron sources for materials studies. COMPASS, the Community Petascale Project for Accelerator Science and Simulation, is a broad, four-office (HEP, NP, BES, ASCR) effort to develop computational tools for the prediction and performance enhancement of accelerators. The tools being developed can be used to predict the dynamics of beams in the presence of optical elements and space charge forces, the calculation of electromagnetic modes and wake fields of cavities, the cooling induced by comoving beams, and the acceleration of beams by intense fields in plasmas generated by beams or lasers. In SciDAC-1, the computational tools had multiple successes in predicting the dynamics of beams and beam generation. In SciDAC-2 these tools will be petascale enabled to allow the inclusion of an unprecedented level of physics for detailed prediction

  19. Anisotropic diffusion in a toroidal geometry

    International Nuclear Information System (INIS)

    Fischer, Paul F

    2005-01-01

    As part of the Department of Energy's applications oriented SciDAC project, three model problems have been proposed by the Center for Extended Magnetohydrodynamics Modeling to test the potential of numerical algorithms for challenging magnetohydrodynamics (MHD) problems that are required for future fusion development. The first of these, anisotropic diffusion in a toroidal geometry, is considered in this note

  20. Final Technical Report - SciDAC Cooperative Agreement: Center for Extended Magnetohydrodynamic Modeling/ Transport and Dynamics in Torodial Fusion System

    International Nuclear Information System (INIS)

    Schanck, Dalton D.

    2010-01-01

    Final technical report for research performed by Professor Dalton D. Schnack on SciDAC Cooperative Agreement: Center for Extended MHD Modeling, DE-FC02-06ER54870, for the period 7/1/06 to 2/15/08. Principal results for this period are: 1. Development of a model for computational modeling for the primitive form of the extended MMD equations. This was reported as Phys. Plasmas 13, 058103 (2006). 2. Comparison between the NIMROD and M3D codes for simulation of the nonlinear sawtooth crash in the CDXU tokamak. This was reported in Phys. Plasmas 14, 056105 (2006). 3. Demonstration of 2-fluid and gyroviscous stabilization of interchange modes using computational extended MHD models. This was reported in Phys. Rev. Letters 101, 085005 (2008). Each of these publications is attached as an Appendix of this report. They should be consulted for technical details.

  1. DOE's SciDAC Visualization and Analytics Center for EnablingTechnologies -- Strategy for Petascale Visual Data Analysis Success

    Energy Technology Data Exchange (ETDEWEB)

    Bethel, E Wes; Johnson, Chris; Aragon, Cecilia; Rubel, Oliver; Weber, Gunther; Pascucci, Valerio; Childs, Hank; Bremer, Peer-Timo; Whitlock, Brad; Ahern, Sean; Meredith, Jeremey; Ostrouchov, George; Joy, Ken; Hamann, Bernd; Garth, Christoph; Cole, Martin; Hansen, Charles; Parker, Steven; Sanderson, Allen; Silva, Claudio; Tricoche, Xavier

    2007-10-01

    The focus of this article is on how one group of researchersthe DOE SciDAC Visualization and Analytics Center for EnablingTechnologies (VACET) is tackling the daunting task of enabling knowledgediscovery through visualization and analytics on some of the world slargest and most complex datasets and on some of the world's largestcomputational platforms. As a Center for Enabling Technology, VACET smission is the creation of usable, production-quality visualization andknowledge discovery software infrastructure that runs on large, parallelcomputer systems at DOE's Open Computing facilities and that providessolutions to challenging visual data exploration and knowledge discoveryneeds of modern science, particularly the DOE sciencecommunity.

  2. Scidac-Data: Enabling Data Driven Modeling of Exascale Computing

    Science.gov (United States)

    Mubarak, Misbah; Ding, Pengfei; Aliaga, Leo; Tsaris, Aristeidis; Norman, Andrew; Lyon, Adam; Ross, Robert

    2017-10-01

    The SciDAC-Data project is a DOE-funded initiative to analyze and exploit two decades of information and analytics that have been collected by the Fermilab data center on the organization, movement, and consumption of high energy physics (HEP) data. The project analyzes the analysis patterns and data organization that have been used by NOvA, MicroBooNE, MINERvA, CDF, D0, and other experiments to develop realistic models of HEP analysis workflows and data processing. The SciDAC-Data project aims to provide both realistic input vectors and corresponding output data that can be used to optimize and validate simulations of HEP analysis. These simulations are designed to address questions of data handling, cache optimization, and workflow structures that are the prerequisites for modern HEP analysis chains to be mapped and optimized to run on the next generation of leadership-class exascale computing facilities. We present the use of a subset of the SciDAC-Data distributions, acquired from analysis of approximately 71,000 HEP workflows run on the Fermilab data center and corresponding to over 9 million individual analysis jobs, as the input to detailed queuing simulations that model the expected data consumption and caching behaviors of the work running in high performance computing (HPC) and high throughput computing (HTC) environments. In particular we describe how the Sequential Access via Metadata (SAM) data-handling system in combination with the dCache/Enstore-based data archive facilities has been used to develop radically different models for analyzing the HEP data. We also show how the simulations may be used to assess the impact of design choices in archive facilities.

  3. SciDAC Visualization and Analytics Center for Enabling Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Joy, Kenneth I. [Univ. of California, Davis, CA (United States)

    2014-09-14

    This project focuses on leveraging scientific visualization and analytics software technology as an enabling technology for increasing scientific productivity and insight. Advances in computational technology have resulted in an "information big bang," which in turn has created a significant data understanding challenge. This challenge is widely acknowledged to be one of the primary bottlenecks in contemporary science. The vision for our Center is to respond directly to that challenge by adapting, extending, creating when necessary and deploying visualization and data understanding technologies for our science stakeholders. Using an organizational model as a Visualization and Analytics Center for Enabling Technologies (VACET), we are well positioned to be responsive to the needs of a diverse set of scientific stakeholders in a coordinated fashion using a range of visualization, mathematics, statistics, computer and computational science and data management technologies.

  4. Community petascale project for accelerator science and simulation: Advancing computational science for future accelerators and accelerator technologies

    International Nuclear Information System (INIS)

    Spentzouris, P.; Cary, J.; McInnes, L.C.; Mori, W.; Ng, C.; Ng, E.; Ryne, R.

    2008-01-01

    The design and performance optimization of particle accelerators are essential for the success of the DOE scientific program in the next decade. Particle accelerators are very complex systems whose accurate description involves a large number of degrees of freedom and requires the inclusion of many physics processes. Building on the success of the SciDAC-1 Accelerator Science and Technology project, the SciDAC-2 Community Petascale Project for Accelerator Science and Simulation (ComPASS) is developing a comprehensive set of interoperable components for beam dynamics, electromagnetics, electron cooling, and laser/plasma acceleration modelling. ComPASS is providing accelerator scientists the tools required to enable the necessary accelerator simulation paradigm shift from high-fidelity single physics process modeling (covered under SciDAC1) to high-fidelity multiphysics modeling. Our computational frameworks have been used to model the behavior of a large number of accelerators and accelerator R and D experiments, assisting both their design and performance optimization. As parallel computational applications, the ComPASS codes have been shown to make effective use of thousands of processors.

  5. SciDAC visualization and analytics center for enabling technology

    International Nuclear Information System (INIS)

    Bethel, E Wes; Johnson, Chris; Joy, Ken; Ahern, Sean; Pascucci, Valerio; Childs, Hank; Cohen, Jonathan; Duchaineau, Mark; Hamann, Bernd; Hansen, Charles; Laney, Dan; Lindstrom, Peter; Meredith, Jeremy; Ostrouchov, George; Parker, Steven; Silva, Claudio; Sanderson, Allen; Tricoche, Xavier

    2007-01-01

    The Visualization and Analytics Center for Enabling Technologies (VACET) focuses on leveraging scientific visualization and analytics software technology as an enabling technology for increasing scientific productivity and insight. Advances in computational technology have resulted in an 'information big bang,' which in turn has created a significant data understanding challenge. This challenge is widely acknowledged to be one of the primary bottlenecks in contemporary science. The vision of VACET is to adapt, extend, create when necessary, and deploy visual data analysis solutions that are responsive to the needs of DOE's computational and experimental scientists. Our center is engineered to be directly responsive to those needs and to deliver solutions for use in DOE's large open computing facilities. The research and development directly target data understanding problems provided by our scientific application stakeholders. VACET draws from a diverse set of visualization technology ranging from production quality applications and application frameworks to state-of-the-art algorithms for visualization, analysis, analytics, data manipulation, and data management

  6. The QCDOC Project

    International Nuclear Information System (INIS)

    Boyle, P.; Chen, D.; Christ, N.; Clark, M.; Cohen, S.; Cristian, C.; Dong, Z.; Gara, A.; Joo, B.; Jung, C.; Kim, C.; Levkova, L.; Liao, X.; Liu, G.; Li, S.; Lin, H.; Mawhinney, R.; Ohta, S.; Petrov, K.; Wettig, T.; Yamaguchi, A.

    2005-01-01

    The QCDOC project has developed a supercomputer optimised for the needs of Lattice QCD simulations. It provides a very competitive price to sustained performance ratio of around $1 USD per sustained Megaflop/s in combination with outstanding scalability. Thus very large systems delivering over 5 TFlop/s of performance on the evolution of a single lattice is possible. Large prototypes have been built and are functioning correctly. The software environment raises the state of the art in such custom supercomputers. It is based on a lean custom node operating system that eliminates many unnecessary overheads that plague other systems. Despite the custom nature, the operating system implements a standards compliant UNIX-like programming environment easing the porting of software from other systems. The SciDAC QMP interface adds internode communication in a fashion that provides a uniform cross-platform programming environment

  7. US SciDAC Program on Integrated Simulation of Edge Transport in Fusion Plasmas, and its Progress

    International Nuclear Information System (INIS)

    Chang, C.S.

    2007-01-01

    The multi-institutional collaborative center for plasma edge simulation (CPES) has been launched in the USA under the SciDAC (Scientific Discovery through Advanced Computing) Fusion Simulation Program. This is a multi-disciplinary effort among physicists, applied mathematicians, and computer scientists from 15 national laboratories and universities. Its goal is to perform first principles simulations on plasma transport in the edge region from the top of the pedestal to the scrape off/divertor regions bounded by a material wall, and to predict L-H transition, pedestal buildup, ELM crashes, scrape-off transport and divertor heat load. As a major part of the effort, a PIC gyrokinetic edge code XGC is constructed. The gyrokinetic edge code XGC is coupled to a nonlinear edge MHD/2fluid code (M3D and NIMROD) to predict the cycle of pedestal buildup and ELM crash. The magnetic geometry includes the realistic separatrix, X-point, open field lines and material wall. In the first phase of this effort, the electrostatic version of the PIC gyrokinetic code XGC-1 has been built, to be extended into an electromagnetic version soon in the next phase. XGC-1 includes the gyrokinetic ions, electrons, and Monte Carlo neutrals with wall recycling. Since the ions have non-Maxwellian distribution function in the edge, as demonstrated in XGC, a full-f ion technique is used. Electrons are, though, handled with a mixed-f technique: the full-f technique for neoclassical and adiabatic or delta-f split-weight techniques for turbulence physics. The mixed-f electron approach used in XGC is new, successfully integrating the neoclassical and turbulence physics. Recent progress and results on neoclassical and electrostatic turbulence transports will be reported, which includes the pedestal buildup by neutral ionization, density pedestal width scaling, electrostatic potential and plasma flow distributions in the pedestal and scrape-off, and other important physical effects in the pedestal

  8. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  9. National Computational Infrastructure for Lattice Gauge Theory SciDAC-2 Closeout Report

    Energy Technology Data Exchange (ETDEWEB)

    Sun, Xian-He

    2013-08-01

    As part of this project work, researchers from Vanderbilt University, Fermi National Laboratory and Illinois Institute of technology developed a real-time cluster fault-tolerant cluster monitoring framework. This framework is open source and is available for download upon request. This work has also been used at Fermi Laboratory, Vanderbilt University and Mississippi State University across projects other than LQCD. The goal for the scientific workflow project is to investigate and develop domain-specific workflow tools for LQCD to help effectively orchestrate, in parallel, computational campaigns consisting of many loosely-coupled batch processing jobs. Major requirements for an LQCD workflow system include: a system to manage input metadata, e.g. physics parameters such as masses, a system to manage and permit the reuse of templates describing workflows, a system to capture data provenance information, a systems to manage produced data, a means of monitoring workflow progress and status, a means of resuming or extending a stopped workflow, fault tolerance features to enhance the reliability of running workflows. Requirements for an LQCD workflow system are available in documentation.

  10. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  11. National Computational Infrastructure for LatticeGauge Theory SciDAC-2 Closeout Report

    Energy Technology Data Exchange (ETDEWEB)

    Bapty, Theodore; Dubey, Abhishek

    2013-07-18

    As part of the reliability project work, researchers from Vanderbilt University, Fermi National Laboratory and Illinois Institute of technology developed a real-time cluster fault-tolerant cluster monitoring framework. The goal for the scientific workflow project is to investigate and develop domain-specific workflow tools for LQCD to help effectively orchestrate, in parallel, computational campaigns consisting of many loosely-coupled batch processing jobs. Major requirements for an LQCD workflow system include: a system to manage input metadata, e.g. physics parameters such as masses, a system to manage and permit the reuse of templates describing workflows, a system to capture data provenance information, a systems to manage produced data, a means of monitoring workflow progress and status, a means of resuming or extending a stopped workflow, fault tolerance features to enhance the reliability of running workflows. In summary, these achievements are reported: • Implemented a software system to manage parameters. This includes a parameter set language based on a superset of the JSON data-interchange format, parsers in multiple languages (C++, Python, Ruby), and a web-based interface tool. It also includes a templating system that can produce input text for LQCD applications like MILC. • Implemented a monitoring sensor framework in software that is in production on the Fermilab USQCD facility. This includes equipment health, process accounting, MPI/QMP process tracking, and batch system (Torque) job monitoring. All sensor data are available from databases, and various query tools can be used to extract common data patterns and perform ad hoc searches. Common batch system queries such as job status are available in command line tools and are used in actual workflow-based production by a subset of Fermilab users. • Developed a formal state machine model for scientific workflow and reliability systems. This includes the use of Vanderbilt’s Generic Modeling

  12. VACET: Proposed SciDAC2 Visualization and Analytics Center for Enabling Technologies

    International Nuclear Information System (INIS)

    Bethel, W; Johnson, C; Hansen, C; Parker, S; Sanderson, A; Silva, C; Tricoche, X; Pascucci, V; Childs, H; Cohen, J; Duchaineau, M; Laney, D; Lindstrom, P; Ahern, S; Meredith, J; Ostrouchov, G; Joy, K; Hamann, B

    2006-01-01

    This project focuses on leveraging scientific visualization and analytics software technology as an enabling technology for increasing scientific productivity and insight. Advances in computational technology have resulted in an 'information big bang',' which in turn has created a significant data understanding challenge. This challenge is widely acknowledged to be one of the primary bottlenecks in contemporary science. The vision for our Center is to respond directly to that challenge by adapting, extending, creating when necessary and deploying visualization and data understanding technologies for our science stakeholders. Using an organizational model as a Visualization and Analytics Center for Enabling Technologies (VACET), we are well positioned to be responsive to the needs of a diverse set of scientific stakeholders in a coordinated fashion using a range of visualization, mathematics, statistics, computer and computational science and data management technologies

  13. projecting pARTicles, a STEAM project

    CERN Document Server

    Goldfarb, Steven; The ATLAS collaboration

    2016-01-01

    Agnes Chavez is a media artist based in the US (New Mexico) and involved in STEM Art Labs. An informal partnership initiated with some ATLAS physicists will develop further in 2016 through a series of workshops where Virtual Visits, Master Class material and the presence of a physicist will be gradually integrated. The project can be seen as an illustration of constructive and long term collaboration between artists, students and scientists.

  14. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  15. SCIDAC Center for simulation of wave particle interactions CompX participation

    Energy Technology Data Exchange (ETDEWEB)

    Harvey, R.W. [CompX, Del Mar, CA (United States)

    2017-11-14

    Harnessing the energy that is released in fusion reactions would provide a safe and abundant source of power to meet the growing energy needs of the world population. The next step toward the development of fusion as a practical energy source is the construction of ITER, a device capable of producing and controlling the high performance plasma required for self-sustaining fusion reactions, or “burning” plasma. The input power required to drive the ITER plasma into the burning regime will be supplied primarily with a combination of external power from radio frequency waves in the ion cyclotron range of frequencies and energetic ions from neutral beam injection sources, in addition to internally generated Ohmic heating from the induced plasma current that also serves to create the magnetic equilibrium for the discharge. The ITER project is a large multi-billion dollar international project in which the US participates. The success of the ITER project depends critically on the ability to create and maintain burning plasma conditions, it is absolutely necessary to have physics-based models that can accurately simulate the RF processes that affect the dynamical evolution of the ITER discharge. The Center for Simulation of WavePlasma Interactions (CSWPI), also known as RF-SciDAC, is a multi-institutional collaboration that has conducted ongoing research aimed at developing: (1) Coupled core-to-edge simulations that will lead to an increased understanding of parasitic losses of the applied RF power in the boundary plasma between the RF antenna and the core plasma; (2) Development of models for core interactions of RF waves with energetic electrons and ions (including fusion alpha particles and fast neutral beam ions) that include a more accurate representation of the particle dynamics in the combined equilibrium and wave fields; and (3) Development of improved algorithms that will take advantage of massively parallel computing platforms at the petascale level and

  16. Data security on the national fusion grid

    International Nuclear Information System (INIS)

    Burruss, Justine R.; Fredian, Tom W.; Thompson, Mary R.

    2005-01-01

    The National Fusion Collaboratory project is developing and deploying new distributed computing and remote collaboration technologies with the goal of advancing magnetic fusion energy research. This work has led to the development of the US Fusion Grid (FusionGrid), a computational grid composed of collaborative, compute, and data resources from the three large US fusion research facilities and with users both in the US and in Europe. Critical to the development of FusionGrid was the creation and deployment of technologies to ensure security in a heterogeneous environment. These solutions to the problems of authentication, authorization, data transfer, and secure data storage, as well as the lessons learned during the development of these solutions, may be applied outside of FusionGrid and scale to future computing infrastructures such as those for next-generation devices like ITER

  17. Security on the US Fusion Grid

    International Nuclear Information System (INIS)

    Burruss, Justin R.; Fredian, Tom W.; Thompson, Mary R.

    2005-01-01

    The National Fusion Collaboratory project is developing and deploying new distributed computing and remote collaboration technologies with the goal of advancing magnetic fusion energy research. This work has led to the development of the US Fusion Grid (FusionGrid), a computational grid composed of collaborative, compute, and data resources from the three large US fusion research facilities and with users both in the US and in Europe. Critical to the development of FusionGrid was the creation and deployment of technologies to ensure security in a heterogeneous environment. These solutions to the problems of authentication, authorization, data transfer, and secure data storage, as well as the lessons learned during the development of these solutions, may be applied outside of FusionGrid and scale to future computing infrastructures such as those for next-generation devices like ITER

  18. Security on the US Fusion Grid

    Energy Technology Data Exchange (ETDEWEB)

    Burruss, Justin R.; Fredian, Tom W.; Thompson, Mary R.

    2005-06-01

    The National Fusion Collaboratory project is developing and deploying new distributed computing and remote collaboration technologies with the goal of advancing magnetic fusion energy research. This work has led to the development of the US Fusion Grid (FusionGrid), a computational grid composed of collaborative, compute, and data resources from the three large US fusion research facilities and with users both in the US and in Europe. Critical to the development of FusionGrid was the creation and deployment of technologies to ensure security in a heterogeneous environment. These solutions to the problems of authentication, authorization, data transfer, and secure data storage, as well as the lessons learned during the development of these solutions, may be applied outside of FusionGrid and scale to future computing infrastructures such as those for next-generation devices like ITER.

  19. Data security on the national fusion grid

    Energy Technology Data Exchange (ETDEWEB)

    Burruss, Justine R.; Fredian, Tom W.; Thompson, Mary R.

    2005-06-01

    The National Fusion Collaboratory project is developing and deploying new distributed computing and remote collaboration technologies with the goal of advancing magnetic fusion energy research. This work has led to the development of the US Fusion Grid (FusionGrid), a computational grid composed of collaborative, compute, and data resources from the three large US fusion research facilities and with users both in the US and in Europe. Critical to the development of FusionGrid was the creation and deployment of technologies to ensure security in a heterogeneous environment. These solutions to the problems of authentication, authorization, data transfer, and secure data storage, as well as the lessons learned during the development of these solutions, may be applied outside of FusionGrid and scale to future computing infrastructures such as those for next-generation devices like ITER.

  20. Security on the US fusion grid

    International Nuclear Information System (INIS)

    Burruss, J.R.; Fredian, T.W.; Thompson, M.R.

    2006-01-01

    The National Fusion Collaboratory project is developing and deploying new distributed computing and remote collaboration technologies with the goal of advancing magnetic fusion energy research. This has led to the development of the U.S. fusion grid (FusionGrid), a computational grid composed of collaborative, compute, and data resources from the three large U.S. fusion research facilities and with users both in the U.S. and in Europe. Critical to the development of FusionGrid was the creation and deployment of technologies to ensure security in a heterogeneous environment. These solutions to the problems of authentication, authorization, data transfer, and secure data storage, as well as the lessons learned during the development of these solutions, may be applied outside of FusionGrid and scale to future computing infrastructures such as those for next-generation devices like ITER

  1. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  2. A global cleanout project

    International Nuclear Information System (INIS)

    Edlow, J.; Gruber, G.

    2004-01-01

    Once upon a time there was a great dream of a atomic age for mankind. The technically advanced nations of the world promised amazing opportunities for all and promoted their materials and equipment often by supplying them throughout the world in the race to gain market share. For a time, the dream was fulfilled, as many countries embraced the new technologies initially for research and later for medical, power and even transport opportunities. In due course, the demand subsided and in some countries has even been reversed with plans to terminate outdated or unneeded facilities. This brings up the issue of nuclear waste disposal. It was not until post 'Sept 11', that the US and other countries and NGOs began to seriously think about the larger implications of terrorist use of 'Dirty Bombs'. This has led to the potential of a wider program aimed at the possible return of a larger amount of 'abandoned' materials. Thus the 'GLOBAL CLEANOUT PROJECT' was borne. Many in the nuclear fuel cycle will have a stake in this and can play a role in an international community to deal with the issue and it has to be started now. (author)

  3. Community Petascale Project for Accelerator Science and Simulation: Advancing Computational Science for Future Accelerators and Accelerator Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Spentzouris, P.; /Fermilab; Cary, J.; /Tech-X, Boulder; McInnes, L.C.; /Argonne; Mori, W.; /UCLA; Ng, C.; /SLAC; Ng, E.; Ryne, R.; /LBL, Berkeley

    2011-11-14

    The design and performance optimization of particle accelerators are essential for the success of the DOE scientific program in the next decade. Particle accelerators are very complex systems whose accurate description involves a large number of degrees of freedom and requires the inclusion of many physics processes. Building on the success of the SciDAC-1 Accelerator Science and Technology project, the SciDAC-2 Community Petascale Project for Accelerator Science and Simulation (ComPASS) is developing a comprehensive set of interoperable components for beam dynamics, electromagnetics, electron cooling, and laser/plasma acceleration modelling. ComPASS is providing accelerator scientists the tools required to enable the necessary accelerator simulation paradigm shift from high-fidelity single physics process modeling (covered under SciDAC1) to high-fidelity multiphysics modeling. Our computational frameworks have been used to model the behavior of a large number of accelerators and accelerator R&D experiments, assisting both their design and performance optimization. As parallel computational applications, the ComPASS codes have been shown to make effective use of thousands of processors. ComPASS is in the first year of executing its plan to develop the next-generation HPC accelerator modeling tools. ComPASS aims to develop an integrated simulation environment that will utilize existing and new accelerator physics modules with petascale capabilities, by employing modern computing and solver technologies. The ComPASS vision is to deliver to accelerator scientists a virtual accelerator and virtual prototyping modeling environment, with the necessary multiphysics, multiscale capabilities. The plan for this development includes delivering accelerator modeling applications appropriate for each stage of the ComPASS software evolution. Such applications are already being used to address challenging problems in accelerator design and optimization. The ComPASS organization

  4. Nucleus: A pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Finnell, Joshua Eugene [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Klein, Martin [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Cain, Brian J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-09

    The proposal is to provide institutional infrastructure that facilitates management of research projects, research collaboration, and management, preservation, and discovery of data. Deploying such infrastructure will amplify the effectiveness, efficiency, and impact of research, as well as assist researchers in regards to compliance with both data management mandates and LANL security policy. This will facilitate discoverability of LANL research both within the lab and external to LANL.

  5. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  6. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  7. A successful integrated project.

    Science.gov (United States)

    Zheng, P

    1994-10-01

    The experiences of the Juxian County Family Planning Committee of Shandong Province, China, were discussed in terms of the integration of family planning with income generation activities in rural areas. The integrated program was initiated in 1988 with pilot programs established by the Qiaoshan Family Planning Association to develop marketable skills in carpet weaving and grass braiding in Xiazhuang Town and Qiaoshan Township. The program gave priority of admission to women with only children and those who practiced family planning. 1400 women were recruited in these factories. Other income generation programs were developed for silkworm breeding and silk reeling, woolen embroidery, and printing. High ranking officials of the China Family Planning Association commended the work in income generation and family planning in Juxian County. This recognition spurred the second phase of development by the county family planning association: the establishment of village operated factories and mills for native products. By the end of 1991, there were 26 such projects in the county and per capita income to women increased by RMB 678 yuan. In the third stage of 1992, the number of association enterprises increased to 196 with recruitment of over 18,000 reproductive age women. The programs were initiated with collective funds from farmers and villages. The 170 projects in 1992 were developed with an investment of 9.6 million yuan, of which 2.26 million yuan was from individuals (23.5%). Emphasis was placed on self-reliance and recruitment of women with one child, women with 2 daughters and tubal ligations, and family planning motivators. The consequences of the integrated program were weakening traditional customs of marriage and childbearing, improvement in socioeconomic status of women, and effective service delivery of family planning and maternal and child health care services.

  8. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  9. Projecting Images on a Sphere

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A system for projecting images on an object with a reflective surface. A plurality of image projectors are spaced around the object and synchronized such that each...

  10. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  11. Project management at a university

    Science.gov (United States)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  12. A Practical Recycling Project . . .

    Science.gov (United States)

    Durant, Raymond H.; Mikuska, James M.

    1973-01-01

    Descirbes a school district's recycling program of aluminum lunch trays that are collected after their use. The trays are used as scrap metal in industrial education workshop and used for sand castings. (PS)

  13. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  14. Structuring a mega-project

    Energy Technology Data Exchange (ETDEWEB)

    Kutryk, T. [Husky Oil Operations Ltd., Calgary, AB (Canada)

    2004-07-01

    This paper presented an overview of mega-project management. Issues concerning scope, cost and schedule were discussed, with reference to the idea that a choice must be made from the outset as to which of the 3 is a main priority. The importance of preparation and the development of a fully resourced plan was emphasized. The use of the parametric 4-D model was discussed. Lessons that the construction industry may learn from manufacturers were presented along with issues of contract development and the role and importance of the project manager. Issues concerning performance measurement were reviewed, including lagging indicators. Project division factors were also discussed, with reference to data lags, naturally concurrent processes and over the fence units. A case study of Walmart was presented. Project design packages and long lead time items were discussed, as were issues concerning human resources. Functional units were examined in relation to zones of influence and unit integration. Various combinations of zones of influence were presented. Issues concerning span of control and varying relationships within a project were discussed. It was emphasized that great deeds can be accomplished by attracting the best people. tabs., figs.

  15. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  16. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  17. Shippingport: A relevant decommissioning project

    International Nuclear Information System (INIS)

    Crimi, F.P.

    1988-01-01

    Because of Shippingport's low electrical power rating (72 MWe), there has been some misunderstanding on the relevancy of the Shippingport Station Decommissioning Project (SSDP) to a modern 1175 MWe commercial pressurized water reactor (PWR) power station. This paper provides a comparison of the major components of the reactor plant of the 72 MWe Shippingport Atomic Power Station and an 1175 MWe nuclear plant and the relevancy of the Shippingport decommissioning as a demonstration project for the nuclear industry. For the purpose of this comparison, Portland General Electric Company's 1175 MWe Trojan Nuclear Plant at Rainier, Oregon, has been used as the reference nuclear power plant. 2 refs., 2 figs., 1 tab

  18. How to write a project

    DEFF Research Database (Denmark)

    Juul, Nina; Schröder, Sascha Thorsten

    2013-01-01

    This is a short introduction to the content of a good project report. Not all paragraphs are applicable in all situations. Furthermore, this is meant as a guideline, not an exhaustive list of subjects to include. Only open reports are included, hence, do not follow this guideline for specific ass...

  19. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  20. A Decade of Project 2061

    Science.gov (United States)

    Lagowski, J. J.

    1996-04-01

    Ten years ago the American Association for the Advancement of Science (AAAS) launched Project 2061, the first of the truly systemic projects focused on reform in K--12 science education. Project 2061 addresses science literacy for all people rather than only those in the more narrowly construed basic science disciplines; it includes the natural and social sciences, mathematics, and technology. Because it deals with the influence of science on all people's lives, Project 2061 is irrefutably systemic. The general strategy of Project 2061 was to forge a consensus on learning goals as the basis for all other changes to the system of science education. Up front, the designers of Project 2061 announced that it would require at least 25 years to achieve its goals. The fact that the project has survived its tenth year is a tribute to the funding agencies and their confidence in the 2061 concept and its designers. The original supporters--the Carnegie Corporation and the Andrew W. Mellon Foundation--continue to support Project 2061. From the start, Project 2061 emphasized the importance of science as one of the great human activities, much like the visual arts, literature, and music. The basic premise of the project was that the excitement in science should be made available to all students if they are to become science literate. The project's first major report, Science for All Americans, traced the lack of science literacy to problems derived from administrative and curricular issues like the crushing workloads of teachers; antiquated support systems; poor training; textbooks and methods of instruction that impede inquiry, critical thought, and recognition of connections among ideas; and an overstuffed curriculum that offered some topics in needless detail while overlooking ideas and skills critical to science literacy. The chief intent of Science for All Americans, was to provide a fresh, critical look at what science was most worth learning. Put another way, the

  1. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  2. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    GRAPĂ ADELINA-ROXANA

    2014-05-01

    Full Text Available Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. This problem raises questions about the value and effectiveness of Project Management and Project Management systems. Programs and projects are considered as strategic assets for the majority of businesses, therefore, the trend of these organizations is to embrace a management by projects culture. The main objective of Project Management nowadays is to ensure programs and projects aligned to a certain strategy and also to provide for every member of an organization the ability to take proactive actions creating additional benefits.

  3. YUCCA MOUNTAIN PROJECT - A BRIEFING -

    International Nuclear Information System (INIS)

    2003-01-01

    This report has the following articles: Nuclear waste--a long-term national problem; Spent nuclear fuel; High-level radioactive waste; Radioactivity and the environment; Current storage methods; Disposal options; U.S. policy on nuclear waste; The focus on Yucca Mountain; The purpose and scope of the Yucca Mountain Project; The approach for permanently disposing of waste; The scientific studies at Yucca Mountain; The proposed design for a repository at Yucca Mountain; Natural and engineered barriers would work together to isolate waste; Meticulous science and technology to protect people and the environment; Licensing a repository; Transporting waste to a permanent repository; The Environmental Impact Statement for a repository; Current status of the Yucca Mountain Project; and Further information available on the Internet

  4. Temporary Residences: a becoming project

    Directory of Open Access Journals (Sweden)

    Luisa Ingaramo

    2012-04-01

    Full Text Available Among the experimental actions fostered so far by the Compagnia di San Paolo through its Housing Program, committed in handling the complex and fragmented housing discomfort issue, the Temporary Dwellings initiative represents a unique and innovative experience, as it actually offers the chance to activate a proper managerial direction around and about the real estate development processes. In particular, the Temporary Dwellings action is marked by two key aspects: a structured co-planning vision and projects selected through a requests for proposal system. The process in the whole aims on the one hand at reaching an high transparent level of decision making , while, on the other hand, at developing a continuous and mutual monitoring and matching activity between the Housing Program and the group of cross-curricular experts teamed up in the project: technicians, designers, managers, psychologists, contractors, and the other local stakeholders.

  5. Definition of a dismantling project

    International Nuclear Information System (INIS)

    Meyers, H.; Claes, J.; Geens, L.

    1988-01-01

    The shutdown of the fuel reprocessing plant of Eurochemic having been decided, a study for defining the facilities to be dismantled and how to do it, was conducted by Belgoprocess. The cost of the operation was estimated by an accurate investigation and by a pilot project on the dismantling of the wastes storage building. The work carried out up to now and the problems to be solved are summarized [fr

  6. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    OpenAIRE

    GRAPA ADELINA-ROXANA; SOARE ALICE-MAGDALENA

    2014-01-01

    Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. T...

  7. Capital effectiveness in a capital intensive project

    Energy Technology Data Exchange (ETDEWEB)

    Yarossi, M.E. (IPA Institute, The Hague (Netherlands))

    2009-07-01

    The technical difficulty of incorporating new technology in capital intensive projects has been underestimated. Bio-refineries projects are no exemption. These projects in many occasions have assigned inadequate project resources, such as lean project teams and overly optimistic contingencies. Furthermore, project developers have set unrealistic expectations; for example: aggressive schedule duration, low cost targets and optimistic operability targets. These project drivers set before project's authorization compromise the project's outcome. In many cases, this translates into lower return on investment, higher costs, and lower operability. In order to counteract these outcomes, it is critical for capital intensive projects, like bio-refineries, to have a well define project which will enable to increase its chance of success. IPA's research has shown that bio-refineries projects have poor project performance due to poor project practices, lack of owner project controls and inadequate change management. An adequate risk analysis during definition is a critical component of a project's success, especially when there is new technology, like biomass conversion. It is of outmost importance to asses this technology and set realistic expectations. parallel to this, there is a need to have a well established execution strategy, which should be maintained throughout the execution of the project. In conclusion, IPA's research has indicated that bio-refineries, as any other capital intensive project, need to assign adequate resources at an early state of project development, by making sure there is and adequate team in place, reasonable schedule, technical difficulties evaluation, and keeping control during execution. Although these elements might be seen as common practices that should be taken into account when developing a project, many projects being their execution without having a proper foundation, and thus affecting the project

  8. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  9. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  10. Project W.A.T.E.R.

    Science.gov (United States)

    EnviroTeach, 1992

    1992-01-01

    Introduces networking projects for studying rivers and water quality. Describes two projects in South Africa (Project W.A.T.E.R and SWAP) associated with the international network, Global Rivers Environmental Education Network. Discusses water test kits and educational material developed through Project W.A.T.E.R. (Water Awareness through…

  11. A Model of Project and Organisational Dynamics

    OpenAIRE

    Jenny Leonard

    2012-01-01

    The strategic, transformational nature of many information systems projects is now widely understood. Large-scale implementations of systems are known to require significant management of organisational change in order to be successful. Moreover, projects are rarely executed in isolation – most organisations have a large programme of projects being implemented at any one time. However, project and value management methodologies provide ad hoc definitions of the relationship between a project ...

  12. The TackSHS project - a collaborative H2020 project

    Directory of Open Access Journals (Sweden)

    Esteve Fernandez

    2016-03-01

    Full Text Available TackSHS is a new research project funded by the European Union’s Horizon 2020 Research and Innovation Programme. It aims to improve our understanding of second-hand tobacco smoke and e-cigarette emissions and find ways of tackling the health burden caused by exposure to them. Within a fast changing environment, the project will try to elucidate the comprehensive impact that SHS and e-cigarette aerosols have on respiratory health of the European population and how health impacts vary according to socio-economic parameters with particular emphasis on specific vulnerable groups such as patients suffering from chronic lung diseases.

  13. Practical experience with a data collection project: the OREDA project

    International Nuclear Information System (INIS)

    Sandtorv, Helge A.; Hokstad, Per; Thompson, David W.

    1996-01-01

    Experience data on the reliability of equipment has become vital to many types of engineering and maintenance analyses. The consequences of incorrect design or poor maintenance may adversely affect: safety, the environment or cost in most categories of process industries, and, in particular, offshore exploration and production industries. The OREDA project is a data collection programme for the offshore industry which has been operating since the early 80's. A high level of knowledge has been gained from this programme on: specification of data, data collection methods and the utilization of data. Some of the results and the knowledge gained from this project are presented in this paper

  14. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  15. Project Rulison: a preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, M Jr; Bray, B G; Mann, R L

    1970-01-01

    Project Rulison was designed to use underground nuclear technology to determine the potential of this technique for commercial development of the deep, thick, lenticular, low permeability, Mesaverde Formation of the Tuli Rulison field in Garfield County, Colorado. A feasibility study completed in July 1966 indicated that nuclear explosives were a potentially economic method of stimulating recovery of natural gas from the reservoir. The gas-in-place, estimated to be between 90 to 125 billion cu ft per 640 acres from earlier wells, was confirmed from information obtained on 2 conventional wells completed in 1966. The Project Rulison exploratory well, R-EX, was completed in May 1968. Detailed testing of this well provided data on geology, hydrology and reservoir characteristics. The data obtained from the testing have been used to determine the flow capacity of the Mesaverde reservoir. The reservoir characteristics were then used as input data to make predictions of post-shot reservoir performance in the nuclear stimulated well, using a radial, unsteady state gas-flow computer model. (20 refs.)

  16. Project Rulison: A preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, Miles Jr [Austral Oil Company Incorporated, Houston, TX (United States); Bray, Bruce G; Mann, Robert L [CER Geonuclear Corporation, Las Vegas, NV (United States)

    1970-05-01

    Project Rulison was designed to use underground nuclear technology to determine the potential of this technique for commercial development of the deep, thick, lenticular, low permeability, Mesaverde Formation of the Rulison Field in Garfield County, Colorado. Since discovery in 1952, this reservoir has been tested by nine widely-spaced conventionally completed wells. A method of stimulation, far greater in magnitude and efficiency than conventional hydraulic fracturing, is needed to recover this gas at economic rates. A feasibility study completed in July 1966 indicated that nuclear explosives were a potentially economic method of stimulating recovery of natural gas from the reservoir. The gas-in-place, estimated to be between 90-125 billion cubic feet per 640 acres from earlier wells, was confirmed from information obtained on two conventional wells completed in 1966. The Project Rulison exploratory well, R-EX, was completed in May 1968. Detailed testing of this well provided data on geology, hydrology and reservoir characteristics. The data obtained from the testing have been used to determine the flow capacity of the Mesaverde reservoir. The reservoir characteristics were then used as input data to make predictions of post-shot reservoir performance in the nuclear stimulated well, using a radial, unsteady state gas flow computer model. A nuclear explosive with a design yield of 40 kilotons was emplaced in a 10-3/4 inch hole at a depth of 8426 feet below ground surface and detonated on September 10, 1969. A preliminary appraisal of the data taken at shot time indicate that the explosive behaved as predicted. The explosion was completely contained underground as predicted and no major seismic damage occurred. The post-shot drilling program, to reenter the chimney, will congruence in March 1970, approximately six months after detonation. A test program will be initiated at that time to determine the degree of reservoir stimulation achieved. (author)

  17. A visual tristimulus projection colorimeter.

    Science.gov (United States)

    Valberg, A

    1971-01-01

    Based on the optical principle of a slide projector, a visual tristimulus projection colorimeter has been developed. The calorimeter operates with easily interchangeable sets of primary color filters placed in a frame at the objective. The apparatus has proved to be fairly accurate. The reproduction of the color matches as measured by the standard deviation is equal to the visual sensitivity to color differences for each observer. Examples of deviations in the matches among individuals as well as deviations compared with the CIE 1931 Standard Observer are given. These deviations are demonstrated to be solely due to individual differences in the perception of metameric colors. Thus, taking advantage of an objective observation (allowing all adjustments to be judged by a group of impartial observers), the colorimeter provides an excellent aid in the study of discrimination, metamerism, and related effects which are of considerable interest in current research in colorimetry and in the study of color vision tests.

  18. A product of three projections

    Czech Academy of Sciences Publication Activity Database

    Kopecká, E.; Müller, Vladimír

    2014-01-01

    Roč. 223, č. 2 (2014), s. 175-186 ISSN 0039-3223 R&D Projects: GA ČR(CZ) GA14-07880S Institutional support: RVO:67985840 Keywords : Hilbert space * projection * extension Subject RIV: BA - General Mathematics Impact factor: 0.610, year: 2014 http://journals.impan.pl/cgi-bin/doi?sm223-2-4

  19. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  20. Managing Challenges in a Multi Contractor Project

    Science.gov (United States)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  1. Criteria for Developing a Successful Privatization Project

    Science.gov (United States)

    1989-05-01

    conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for

  2. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  3. A critical Social Work project

    Directory of Open Access Journals (Sweden)

    Carlos Montaño

    2006-04-01

    Full Text Available Contemporary social transformations, operated by the neoliberal program under the command of financial capital, bring new challenges to the group of citizens and men and women who live by the sale of their labor power. Social workers, individually and collectively, are not separate from this reality. The profession was characterized by its confrontation with these challenges and its questioning and analysis of its role in society, in its attempt to assume more critical profiles and commitments to the interests of workers and the subaltern sectors. An example of this is the “Reconceptualization Movement” and the later attempt to define na “Alternative Social Service” concerned with the meaning of its practice, with the process of critical knowledge, with a criticism of capitalism and its situations of social injustice. The current challenges include overcoming earlier weaknesses, collectively constructing an ethicalpolitical professional project that can competently and committedly confront, at the heart of progressive social forces, the conditions in which workers live (with or without employment as well as other subaltern populations.

  4. A Framework for Categorizing Important Project Variables

    Science.gov (United States)

    Parsons, Vickie S.

    2003-01-01

    While substantial research has led to theories concerning the variables that affect project success, no universal set of such variables has been acknowledged as the standard. The identification of a specific set of controllable variables is needed to minimize project failure. Much has been hypothesized about the need to match project controls and management processes to individual projects in order to increase the chance for success. However, an accepted taxonomy for facilitating this matching process does not exist. This paper surveyed existing literature on classification of project variables. After an analysis of those proposals, a simplified categorization is offered to encourage further research.

  5. Female Project Managers' Workplace Problems: a Survey

    Science.gov (United States)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  6. Project monitoring package (PMP) : A package for project activity monitoring

    International Nuclear Information System (INIS)

    Vyas, K.N.; Kannan, A.; Susandhi, R.; Basu, S.

    1987-01-01

    A package for preparing PERT/CPM network diagrams has been written for PDP-11/34. The program uses PLOT-10 library calls for device interfacing. The package is essentially non-interactive in nature, and reads input data in the form of activity description and duration. It calculates the critical path time and performs time scaling of the events. The report gives a brief outline of the logic used, a sample plot and tabular output for reference. An additional facility for performing project activity monitoring has also been implemented. Activity monitoring generally requires various reports such as feed back reports from various group co-ordinators, information report for project co-ordinator and brief periodical reports for management. A package 'DATATRIEVE' (DTR) on PDP-11/34 system is utilized for generating the above mentioned reports. As DTR can also use normal sequential files, an interfacing program has been written which reformats the files accepted by PERT program acceptable to DTR. Various types of reports as generated by DTR are included. However this part of the package is not transportable and can be implemented only on systems having DTR. 6 figures. (author)

  7. A Model of Project and Organisational Dynamics

    Directory of Open Access Journals (Sweden)

    Jenny Leonard

    2012-04-01

    Full Text Available The strategic, transformational nature of many information systems projects is now widely understood. Large-scale implementations of systems are known to require significant management of organisational change in order to be successful. Moreover, projects are rarely executed in isolation – most organisations have a large programme of projects being implemented at any one time. However, project and value management methodologies provide ad hoc definitions of the relationship between a project and its environment. This limits the ability of an organisation to manage the larger dynamics between projects and organisations, over time, and between projects. The contribution of this paper, therefore, is to use literature on organisational theory to provide a more systematic understanding of this area. The organisational facilitators required to obtain value from a project are categorised, and the processes required to develop those facilitators are defined. This formalisation facilitates generalisation between projects and highlights any time and path dependencies required in developing organisational facilitators. The model therefore has the potential to contribute to the development of IS project management theory within dynamic organisational contexts. Six cases illustrate how this model could be used.

  8. Project communication in a strategic internal perspective

    DEFF Research Database (Denmark)

    Ramsing, Line B.

    2008-01-01

    Purpose - The purpose of this paper is to discus the concept of project communication. What is currently understood by project communication? How and to what degree is it being discussed within the field of corporate communication and project management? And finally, what is the potential of inte...... the concept by defining the aspect of interpersonal project communication and its potential in creating synthesis between the research fields corporate communication and project management....... of interpersonal project communication? Design/methodology/approach - Based on a literature review of the two above mentioned fields of research the discussion of the potential of interpersonal project communication is put in relation to concepts of power relations in an organisation, use of networks...... communication there is no mentioning of project communication. Despite the acknowledged need to focus on communication as a whole in projects there is no indication in the literature that any collaboration exists between the field of corporate communication and the field of project management - creating a gap...

  9. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  10. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  11. Beyond theory : Towards a probabilistic causation model to support project governance in infrastructure projects

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Voordijk, Johannes T.; Dewulf, Geert

    2017-01-01

    A new project governance model for infrastructure projects is described in this paper. This model contains causal mechanisms that relate a number of project governance variables to project performance. Our proposed model includes relevant variables for measuring project governance in construction

  12. Software project management in a changing world

    CERN Document Server

    Ruhe, Günther

    2014-01-01

    By bringing together various current direc­tions, Software Project Management in a Changing World focuses on how people and organizations can make their processes more change-adaptive. The selected chapters closely correspond to the project management knowledge areas introduced by the Project Management Body of Knowledge, including its extension for managing software projects. The contributions are grouped into four parts, preceded by a general introduction. Part I "Fundamentals" provides in-depth insights into fundamental topics including resource allocation, cost estimation and risk manage

  13. Early warnings : a phenomenon in project management

    OpenAIRE

    Nikander, Ilmari O.

    2002-01-01

    The emergence of Concurrent Engineering has caused growing demands on project management. The classic project management methods are often slow: problems may already exist when those methods are applied. The objective of the present study is to improve the opportunities of those responsible for a project's operational management to receive advance information about potential problems and final results through early warnings typical of the theory of weak signals by Igor Ansoff. The researc...

  14. A note on root projection and labelling*

    African Journals Online (AJOL)

    Kate H

    Abstract. This paper identifies a problem with a hypothesis put forward in Chomsky (2013) in relation to his labelling algorithm. Chomsky suggests that category-neutral roots do not qualify as labels and cannot project. However, I provide evidence that the derivation of particle verbs involves the projection of a ...

  15. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  16. A review of software project testing

    Directory of Open Access Journals (Sweden)

    Jose Calvo-Manzano Villalón

    2016-03-01

    Full Text Available In this article a review of software projects based on a taxonomy project is established, allowing the development team or testing personnel to identify the tests to which the project must be subjected for validation. The taxonomy is focused on identifying software projects according to their technology. To establish the taxonomy, a development method comprised of 5 phases was applied. The developed taxonomy is comprised of 10 categories and 35 subcategories and was validated by a group of information technology (IT managers and professionals in the field of IT through the use of a survey. The results obtained from the survey are subjected to the Mann-Whitney U test, which indicates that the taxonomy is validated. The taxonomy can be implemented in development organizations with or without a testing team that provides a classification for technology projects.

  17. A Real-World Project for a Desktop Publishing Course.

    Science.gov (United States)

    Marsden, James D.

    1994-01-01

    Describes a project in a desktop publishing course in which students work with nonprofit and campus organizations to design brochures that fulfill important needs. Discusses specific tools students use. Describes the brochure project, project criteria, clients, text and graphics for the project, how to evaluate the project, and guidelines for…

  18. Enquiring Minds: A "Radical" Curriculum Project?

    Science.gov (United States)

    Morgan, John

    2011-01-01

    This article focuses on Enquiring Minds, a three-year curriculum development project funded by Microsoft as part of its Partners in Learning programme and run by Futurelab. The article suggests that the project is best understood as an example of a new type of "curriculum entrepreneurialism" that is impatient with the traditional…

  19. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... a conceptual framework that addresses three aspects of a projection installation: the contentassociated with the object, the digital content, and the relation between the two. We conclude the paper with a set of strategies commonly used in projection installations: Enhancing or emphasizing physical aspects......; Transforming materiality; Adding virtual objects; 3D effects; Complex content on simple objects or simple content on complex; Strong versus loose connections between the physical object and the digital content. This paper is based on four cases, two of which concern cultural heritage installations, the others...

  20. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  1. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  2. CAUSE AND EFFECT IN PROMOTING A PROJECT

    Directory of Open Access Journals (Sweden)

    SEVERIAN-VLĂDUȚ IACOB

    2013-12-01

    Full Text Available For a project to be considered successful it is necessary, besides a proper coordination, to be also done a good and wide promotion. In view of communication, promotion and maintenance ensures the organization's image. Disturbances occurring in any type of project, as a result of poor promotion, affect the image of the team and highlight the weaknesses in its management. Therefore, the promotion should be permanently monitored and evaluated. Cause-effect analysis is one of the ways we can identify some of nonconformities of the promotion process within a project.

  3. Cascade Error Projection: A New Learning Algorithm

    Science.gov (United States)

    Duong, T. A.; Stubberud, A. R.; Daud, T.; Thakoor, A. P.

    1995-01-01

    A new neural network architecture and a hardware implementable learning algorithm is proposed. The algorithm, called cascade error projection (CEP), handles lack of precision and circuit noise better than existing algorithms.

  4. Subharmonic projections for a quantum Markov semigroup

    International Nuclear Information System (INIS)

    Fagnola, Franco; Rebolledo, Rolando

    2002-01-01

    This article introduces a concept of subharmonic projections for a quantum Markov semigroup, in view of characterizing the support projection of a stationary state in terms of the semigroup generator. These results, together with those of our previous article [J. Math. Phys. 42, 1296 (2001)], lead to a method for proving the existence of faithful stationary states. This is often crucial in the analysis of ergodic properties of quantum Markov semigroups. The method is illustrated by applications to physical models

  5. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  6. COORDINATES OF A RISK MANAGEMENT PROJECT

    OpenAIRE

    ALEXANDRU OLTEANU; MĂDĂLINA ANTOANETA RĂDOI

    2013-01-01

    High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by movi...

  7. A Proposal for a Mindset of a Project Manager

    DEFF Research Database (Denmark)

    Eriksson, Joakim; Hansen, Claus Thorp

    2008-01-01

    and clarification of decision situations and consequences is rarely used in practice and structured reasoning about project and product performance when making decisions is also rare. In order to enhance the project managers’ understanding of decision-making in product development projects, the objective......A company’s product strategy and its management of the product development process have been found to be key factors for a product’s success on the market [1]. Project managers of development projects need support to make process decisions and defining goals that are consistent with the business....... In product development projects it is desirable to reduce the level of uncertainty in order to make decisions without having to redo them later in the project resulting in longer lead time and higher costs. It is the project manager’s responsibility to manage this uncertainty in a complex ever...

  8. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    Science.gov (United States)

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  9. only: A Case Study In Projective Meaning

    OpenAIRE

    Craige Roberts

    2010-01-01

    I offer an integrated theory of the meaning of only in which the prejacent, while not presupposed, is both entailed and backgrounded, hence tends to project (following a general proposal about projection due to Simons et al. 2010). Moreover, I argue, contra Beaver & Brady (2008), that only is not conventionally associated with focus, the focus effects arising instead pragmatically. But I do adopt aspects of their semantics for only, including the presupposition of a pre-order over the ele...

  10. The ALPHA project: A progress report

    International Nuclear Information System (INIS)

    Yadigaroglu, G.

    1995-01-01

    A review of the ALPHA project is presented, including a summary of progress and current status. The project comprises the experimental and analytical investigation of the long-term decay heat removal phenomena from the containment of the next generation of passive Advanced Light Water Reactors. In its present phase, the project is directed to the investigation of the Simplified Boiling Water Reactor (SBWR) Passive Containment Cooling system. The project includes separate-effects tests of containment phenomena (the LINX program). The effects of aerosols that may result from hypothetical severe accidents are also considered (the AIDA program). The construction and commissioning of the major ALPHA experimental facilities, PANDA, LINX-2 and AIDA is complete and the first series of tests are underway. Scaling studies have guided their design. Several small-scale experiments and studies have already produced valuable results

  11. Tidd PFBC Demonstration Project, A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2001-08-31

    The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded technology development effort to demonstrate a new generation of innovative coal utilization processes. One goal of the program is to furnish the energy marketplace with a variety of energy efficient, environmentally superior coal-based technologies. Demonstration projects seek to establish the commercial feasibility of the most promising coal technologies that have proceeded beyond the proof-of-concept stage. This report is a post-project assessment of the DOE CCT Demonstration Program, the Tidd PFBC Demonstration Project. A major objective of the CCT Program is to provide the technical data necessary for the private sector to proceed confidently with the commercial replication of the demonstrated technologies. An essential element of meeting this goal is the dissemination of results from the demonstration projects. This post-project assessment (PPA) report is an independent DOE appraisal of the successes that the completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology, as well as an analysis of the commercial market.

  12. NORWAY: a nuclear demonstration project?

    CERN Multimedia

    Clery, Daniel

    2007-01-01

    "Egil Lillestøl is a man with a rather unusual mission: he wants his homeland of Norway to take the lead in developement of of a new form of nuclear power. Norway is Europe's largest petroleum exporter, from its North Sea oil and gas fields, and Lillestøl, a physicist at the University of Bergen, believes the country needs to do something about its carbon emissions.

  13. Results of a demonstration project

    International Nuclear Information System (INIS)

    Poli, F. De

    1992-01-01

    A consortial (cooperative) plant for the treatment of pig wastes was built in The Marsciano area (Perugia, Italy). The system was designed to recover all the available resources, both in terms of energy and in terms of materials. It is composed of an anaerobic digestion system (CSTR reactor, 15,000 m 3 working volume), producing over 20,000 m 3 of biogas/day, and a number of biogas operating devices (generators of electricity and heat, hay and crop dryer, tobacco dryer, greenhouses), that make all the biogas to be utilized with profit. The solid fraction of digested effluent is sold as fertilizer, the liquid is stored in lagoons for 9 months, and utilized during summer for fertilizing irrigation. The environmental problems of the area, both water pollution and odour emission, were completely solved with a low cost for the farmers, and the Municipality is likely to allow the realization of new pig farms. (au)

  14. DBMS as a Tool for Project Management

    Science.gov (United States)

    Linder, H.

    1984-01-01

    Scientific objectives of crustal dynamics are listed as well as the contents of the centralized data information system for the crustal dynamics project. The system provides for project observation schedules, gives project configuration control information and project site information.

  15. Advanced Selling: A Comprehensive Course Sales Project

    Science.gov (United States)

    Yarrington-Young, Susan; Castleberry, Stephen B.; Coleman, Joshua T.

    2016-01-01

    A comprehensive project for the Advanced Selling course that has been tested at three universities is introduced. After selecting an industry and a company, students engage in a complete industry analysis, a company sales analysis, a sales-specific SWOT analysis, complete a ride day with a salesperson in that firm, then present their findings in a…

  16. A constructivist approach to communication and projection

    DEFF Research Database (Denmark)

    Skytte, Hans

    In connection with a study on relationships between food producers and retail chains a new theory on communication and projection was developed. To position the new theory the paper first gives a short presentation of the traditional communication theory. Then there is a short presentation...... of the paradigm including the research strategy used for the development of the new theory. Following that you will find a section concerning the conceptual framework used for the analysis of the companies. This section is followed by a discussion of the main results and the new communication and projection...

  17. Healy Clean Coal Project: A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2003-09-01

    The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) Program is to provide the energy marketplace with advanced, more efficient, and environmentally responsible coal utilization options by conducting demonstrations of new technologies. These demonstration projects are intended to establish the commercial feasibility of promising advanced coal technologies that have been developed to a level at which they are ready for demonstration testing under commercial conditions. This document serves as a DOE post-project assessment (PPA) of the Healy Clean Coal Project (HCCP), selected under Round III of the CCT Program, and described in a Report to Congress (U.S. Department of Energy, 1991). The desire to demonstrate an innovative power plant that integrates an advanced slagging combustor, a heat recovery system, and both high- and low-temperature emissions control processes prompted the Alaska Industrial Development and Export Authority (AIDEA) to submit a proposal for this project. In April 1991, AIDEA entered into a cooperative agreement with DOE to conduct this project. Other team members included Golden Valley Electric Association (GVEA), host and operator; Usibelli Coal Mine, Inc., coal supplier; TRW, Inc., Space & Technology Division, combustor technology provider; Stone & Webster Engineering Corp. (S&W), engineer; Babcock & Wilcox Company (which acquired the assets of Joy Environmental Technologies, Inc.), supplier of the spray dryer absorber technology; and Steigers Corporation, provider of environmental and permitting support. Foster Wheeler Energy Corporation supplied the boiler. GVEA provided oversight of the design and provided operators during demonstration testing. The project was sited adjacent to GVEA's Healy Unit No. 1 in Healy, Alaska. The objective of this CCT project was to demonstrate the ability of the TRW Clean Coal Combustion System to operate on a blend of run-of-mine (ROM) coal and waste coal, while meeting strict

  18. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  19. Ballistic tongue projection in a miniaturized salamander.

    Science.gov (United States)

    Deban, Stephen M; Bloom, Segall V

    2018-05-20

    Miniaturization of body size is often accompanied by peculiarities in morphology that can have functional consequences. We examined the feeding behavior and morphology of the miniaturized plethodontid salamander Thorius, one of the smallest vertebrates, to determine if its performance and biomechanics differ from those of its larger relatives. High-speed imaging and dynamics analysis of feeding at a range of temperatures show that tongue projection in Thorius macdougalli is ballistic and achieves accelerations of up to 600 G with low thermal sensitivity, indicating that tongue projection is powered by an elastic-recoil mechanism. Preceding ballistic projection is an unusual preparatory phase of tongue protrusion, which, like tongue retraction, shows lower performance and higher thermal sensitivity that are indicative of movement being powered directly by muscle shortening. The variability of tongue-projection kinematics and dynamics is comparable to larger ballistic-tongued plethodontids and reveals that Thorius is capable of modulating its tongue movements in response to prey distance. Morphological examination revealed that T. macdougalli possesses a reduced number of myofibers in the tongue muscles, a large projector muscle mass relative to tongue mass, and an unusual folding of the tongue skeleton, compared with larger relatives. Nonetheless, T. macdougalli retains the elaborated collagen aponeuroses in the projector muscle that store elastic energy and a tongue skeleton that is free of direct myofiber insertion, two features that appear to be essential for ballistic tongue projection in salamanders. © 2018 Wiley Periodicals, Inc.

  20. European projects: a new wave of success

    CERN Document Server

    2011-01-01

    Since the beginning of this year, no fewer than six new EU projects at CERN have been launched. These are just a third of the projects selected by the European Commission for funding during the course of 2010, bringing in some 23 M€ over a period of two to five years. This makes last year our most successful yet in securing EU support, and places CERN among the top 50 out of more than 10,000 participants in the EU’s seventh Framework Programme.   The success rate of our proposals has been very good ever since the beginning of FP7 in 2007, particularly for projects coordinated by CERN. There has been a clear evolution of CERN’s involvement in EU projects over the last 10 years. In the early days, we tended to target the Marie Curie actions and the e-Infrastructures Programme. The former help us to fulfil our mission to train young people, while the latter supported the development of the European Grid, mainly through the EGEE projects. Later, the Organization became a...

  1. A Knotworking Guideline for Building Projects

    DEFF Research Database (Denmark)

    Rasmussen, Mai; Gade, Anne Nørkjær; Jensen, Rasmus Lund

    2017-01-01

    to collaborate occurs. The Finnish method, Knotworking AEC, emphasizes both collaboration and structure of building projects, which accommodates the lack of collaboration in the practices of the AEC sector. However, the recent development of Knotworking AEC implies a lack of written articles on Knotworking AEC...... experiments were analysed by practice theoretical methods. The result of this research is a Knotworking Guideline for Building Projects indicating both the phases, the participants and the tasks of each phase. The contribution of the resultlies in the conduction of a Knotworking session from both a practical...

  2. A dilepton spectrometer project for SIS

    International Nuclear Information System (INIS)

    Meritet, L.

    1991-01-01

    An experimental project is presented to study e + e - pairs production in nucleus-nucleus collisions at GSI. Dileptons appear to be a clean probe to investigate in medium properties of nuclear form factors, baryon excitations (Δ) and mesons (π-dispersion relation; ρ-form factor) at high nuclear matter densities. The design of the detector system will be based on the experience obtained with the DLS-spectrometer at LBL and other dilepton detector systems in operation at high energy facilities. The project includes a fast electron trigger provided by a ring imaging Cherenkov detector with a segmented photomultiplier array. (author) 14 refs., 5 figs

  3. A critical evaluation of the strategy project

    International Nuclear Information System (INIS)

    Howard, B. J.; Liland, A.; Beresford, N. A.; Andersson, K. G.; Cox, G.; Gil, J. M.; Hunt, J.; Nisbet, A.; Oughton, D. H.; Voigt, G.

    2004-01-01

    The STRATEGY project (sustainable restoration and long-term management of contaminated rural, urban and industrial ecosystems; www.strategy-ec.org.uk) addressed the need for a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management of contaminated areas in Western Europe. The project considered both technical and social aspects of implementing restoration strategies for urban and rural environments. The importance of considering socially relevant objectives in addition to the dose reduction was emphasised. A critical evaluation was carried out on 101 selected countermeasures, (including rural waste disposal options), a model was developed to aid optimising countermeasure strategies and a method of carrying out participatory decision-making suggested. The outputs of the project are described and critically evaluated. (authors)

  4. A critical evaluation of the STRATEGY project

    DEFF Research Database (Denmark)

    Howard, B.J.; Liland, A.; Beresford, N.A.

    2004-01-01

    The STRATEGY project (sustainable restoration and long-term management of contaminated rural, urban and industrial ecosystems; www.strategy-ec.org.uk) addressed the need for a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management...... of contaminated areas in Western Europe. The project considered both technical and social aspects of implementing restoration strategies for urban and rural environments. The importance of considering socially relevant objectives in addition to the dose reduction was emphasised. A critical evaluation was carried...... out on 101 selected countermeasures, (including rural waste disposal options), a model was developed to aid optimising countermeasure strategies and a method of carrying out participatory decision-making suggested. The outputs of the project are described and critically evaluated....

  5. Collaborative Project: Building improved optimized parameter estimation algorithms to improve methane and nitrogen fluxes in a climate model

    Energy Technology Data Exchange (ETDEWEB)

    Mahowald, Natalie [Cornell Univ., Ithaca, NY (United States)

    2016-11-29

    Soils in natural and managed ecosystems and wetlands are well known sources of methane, nitrous oxides, and reactive nitrogen gases, but the magnitudes of gas flux to the atmosphere are still poorly constrained. Thus, the reasons for the large increases in atmospheric concentrations of methane and nitrous oxide since the preindustrial time period are not well understood. The low atmospheric concentrations of methane and nitrous oxide, despite being more potent greenhouse gases than carbon dioxide, complicate empirical studies to provide explanations. In addition to climate concerns, the emissions of reactive nitrogen gases from soils are important to the changing nitrogen balance in the earth system, subject to human management, and may change substantially in the future. Thus improved modeling of the emission fluxes of these species from the land surface is important. Currently, there are emission modules for methane and some nitrogen species in the Community Earth System Model’s Community Land Model (CLM-ME/N); however, there are large uncertainties and problems in the simulations, resulting in coarse estimates. In this proposal, we seek to improve these emission modules by combining state-of-the-art process modules for emissions, available data, and new optimization methods. In earth science problems, we often have substantial data and knowledge of processes in disparate systems, and thus we need to combine data and a general process level understanding into a model for projections of future climate that are as accurate as possible. The best methodologies for optimization of parameters in earth system models are still being developed. In this proposal we will develop and apply surrogate algorithms that a) were especially developed for computationally expensive simulations like CLM-ME/N models; b) were (in the earlier surrogate optimization Stochastic RBF) demonstrated to perform very well on computationally expensive complex partial differential equations in

  6. A comparison of electric vehicle integration projects

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Garcia-Valle, Rodrigo; Kempton, Willett

    2012-01-01

    .g. utilization of electric vehicles for ancillary services. To arrive at standardized solutions, it is helpful to analyze the market integration and utilization concepts, architectures and technologies used in a set of state-of-the art electric vehicle demonstration projects. The goal of this paper......It is widely agreed that an intelligent integration of electric vehicles can yield benefits for electric vehicle owner, power grid, and the society as a whole. Numerous electric vehicle utilization concepts have been investigated ranging from the simple e.g. delayed charging to the more advanced e...... is to highlight different approaches to electric vehicle integration in three such projects and describe the underlying technical components which should be harmonized to support interoperability and a broad set of utilization concepts. The projects investigated are the American University of Delaware's V2G...

  7. Michigan: Healthy Homes-Healthy Business Project (A Former EPA CARE Project)

    Science.gov (United States)

    The Healthy Homes-Healthy Business project is a recipient of a Level II CARE cooperative agreement. The communities of focus for this CARE level II project are the adjacent neighborhoods of Southwest Detroit and South Dearborn.

  8. Project for a renewable energy research centre

    Directory of Open Access Journals (Sweden)

    Andrea Giachetta

    2011-04-01

    Full Text Available In Liguria, where sustainable approaches to the design, construction and management of buildings enjoy scant currency, the idea of a company from Milan (FERA s.r.l. setting up a research centre for studies into renewable energy resources, could well open up very interesting development opportunities.The project includes: environmental rehabilitation (restoration projects; strategies for the protection of water resources and waste management systems; passive and active solar systems (solar thermal and experiments with thermodynamic solar energy; hyperinsulation systems, passive cooling of buildings; use of natural materials; bio-climatic use of vegetation. The author describes the project content within the context of the multidisciplinary work that has gone into it.

  9. Project Longshot: A mission to Alpha Centauri

    Science.gov (United States)

    West, Curtis; Chamberlain, Sally; Pagan, Neftali; Stevens, Robert

    1989-01-01

    Project Longshot, an exercise in the Advanced Design Program for Space, had as its destination Alpha Centauri, the closest star system to our own solar system. Alpha Centauri, a trinary star system, is 4.34 light years from earth. Although Project Longshot is impossible based on existing technologies, areas that require further investigation in order to make this feat possible are identified. Three areas where advances in technology are needed are propulsion, data processing for autonomous command and control functions, and reliability. Propulsion, possibly by antimatter annihilation; navigation and navigation aids; reliable hardware and instruments; artificial intelligence to eliminate the need for command telemetry; laser communication; and a reliable, compact, and lightweight power system that converts energy efficiently and reliably present major challenges. Project Longshot promises exciting advances in science and technology and new information concerning the universe.

  10. The Canada Goose Project: A First Project with Children under 3

    Science.gov (United States)

    Brewer, Ruth A.

    2010-01-01

    This project report describes how five children (an infant, three toddlers, and a preschooler) enrolled at a private day care home engaged in their first journey into project work through a study of Canada geese living on a nearby body of water. Prior to the experience described in this paper, the author had used the Project Approach only with…

  11. Streamline Your Project: A Lifecycle Model.

    Science.gov (United States)

    Viren, John

    2000-01-01

    Discusses one approach to project organization providing a baseline lifecycle model for multimedia/CBT development. This variation of the standard four-phase model of Analysis, Design, Development, and Implementation includes a Pre-Analysis phase, called Definition, and a Post-Implementation phase, known as Maintenance. Each phase is described.…

  12. The Digital Humanities as a Humanities Project

    Science.gov (United States)

    Svensson, Patrik

    2012-01-01

    This article argues that the digital humanities can be seen as a humanities project in a time of significant change in the academy. The background is a number of scholarly, educational and technical challenges, the multiple epistemic traditions linked to the digital humanities, the potential reach of the field across and outside the humanities,…

  13. Endangered Species & Biodiversity: A Classroom Project & Theme

    Science.gov (United States)

    Lauro, Brook

    2012-01-01

    Students discover the factors contributing to species losses worldwide by conducting a project about endangered species as a component of a larger classroom theme of biodiversity. Groups conduct research using online endangered- species databases and present results to the class using PowerPoint. Students will improve computer research abilities…

  14. Student Projects as a Funding Source

    Science.gov (United States)

    Henson, Kerry L.

    2010-01-01

    Prompted by restricted funding for a lab which supported student software development work on real-world projects, a contribution program was established to facilitate monetary support from the external clients. The paper explores the relationships between instructor, students and client and how a funding component can affect these ties.…

  15. The Communication Audit as a Class Project.

    Science.gov (United States)

    Conaway, Roger N.

    1994-01-01

    Describes a class project in which students conduct a "communication audit" or assessment of an off-campus organization, providing students with opportunities to explore, examine, monitor, and evaluate communication in a practical way. Discusses grading, beginning the class, contacting clients, instrumentation and procedures, costs, and…

  16. A Communications Approach to Teaching Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2012-01-01

    in the Bachelor of Marketing and Management Communication at Aarhus University is examined and analyzed. The presence of the three Design Science Research Cycles combined with both process and product, highlights the critical role of communication in both understanding Project Management and applying Design...... to both frame the learners’ audience for Project Management Writing assignments, and to provide a concrete organizational context to aid in communication practices such as stakeholder analysis, and the development of a critical internal monitor for quality in the learner’s mind. The relevance of Design...

  17. Re-designing project management : Steps towards a project management curriculum for a sustainable built environment

    NARCIS (Netherlands)

    Heintz, J.L.; Lousberg, L.H.M.J.; Prins, M.

    2015-01-01

    Sustainability concerns add a wide range of both stakeholders and performance expectations to building projects. The transition of a circular economy will also have a significant impact on the way in which building projects are carried out. This in addition to an already established escalation of

  18. Mrica Hydroelectric Project: a study in partnering

    International Nuclear Information System (INIS)

    Loraine, R.K.; Bannmark, O.

    1993-01-01

    This paper describes the contractual and financial aspects of the Mrica Project. Of particular interest is the high degree of cooperation that developed between the various parties, and the effect this had on the progress and completion of the project. This relationship had its origin in the need to make the best use of the relatively scarce funds available. It was vitally important that problems were solved jointly and that costs did not escalate as a result of confrontation between the parties. In this respect, the project was an early manifestation of the contractual relationship now called partnering, and the procedures adopted at Mrica are very similar to those now widely used in partnering contracts. The paper is therefore structured to identify and analyse the key elements of co-operation, and their impact on both the negotiation of the contracts and the completion of the works. (Author)

  19. Spiral and Project-Based Learning with Peer Assessment in a Computer Science Project Management Course

    Science.gov (United States)

    Jaime, Arturo; Blanco, José Miguel; Domínguez, César; Sánchez, Ana; Heras, Jónathan; Usandizaga, Imanol

    2016-01-01

    Different learning methods such as project-based learning, spiral learning and peer assessment have been implemented in science disciplines with different outcomes. This paper presents a proposal for a project management course in the context of a computer science degree. Our proposal combines three well-known methods: project-based learning,…

  20. Multi-Role Project (MRP): A New Project-Based Learning Method for STEM

    Science.gov (United States)

    Warin, Bruno; Talbi, Omar; Kolski, Christophe; Hoogstoel, Frédéric

    2016-01-01

    This paper presents the "Multi-Role Project" method (MRP), a broadly applicable project-based learning method, and describes its implementation and evaluation in the context of a Science, Technology, Engineering, and Mathematics (STEM) course. The MRP method is designed around a meta-principle that considers the project learning activity…

  1. Project Investment and Project Financing: A study on Business Case and Financing Models

    OpenAIRE

    Wang, Simiao

    2012-01-01

    Uncertainty is a very significant factor that must be taken into consideration in project front-end phase management. By taking into uncertainty, the planners can to a great extent make sure that the business case could be accurate between specific intervals, hence business case can be based on to make decision. In a highly uncertain environment; the project sponsors should prefer other means to finance the project rather than using debt. Risk management is extremely important in project fina...

  2. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  3. Towards a Taxonomy for Project Management Competences

    NARCIS (Netherlands)

    Nijhuis, S.A.; Vrijhoef, R.; Kessels, Joseph

    2015-01-01

    Recent research on project management competences did not use a standard set of competences. Twenty-five publications, published in or after 2000, show little agreement on their competences: of the 353 only twelve percent is named more than once. Of the 353, 31 are linked to communication, but a

  4. Siyazama Entrepreneurial Development Project: Challenges of a ...

    African Journals Online (AJOL)

    Calls for global relevance and accountability are prevalent in private-public partnerships. Current community engagement projects in higher educational institutions reflect this focus. The academic partner can play a boundary spanning (bridge building) role in a community–university partnership. The university partner often ...

  5. Project THEMIS: A Center for Remote Sensing.

    Science.gov (United States)

    This report summarizes the technical work accomplished under Project THEMIS, A Center for Remote Sensing at the University of Kansas during the...period 16 September 1967 through 15 September 1973. The highlights of the four major areas forming the remote sensing system are presented. A detailed description of the latest radar spectrometer results is presented.

  6. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  7. Cartographic science: a compendium of map projections, with derivations

    National Research Council Canada - National Science Library

    Fenna, Donald

    2007-01-01

    "From basic projecting to advanced transformations, Cartographic Science: A Compendium of Map Projections, with Derivations comprehensively explores the depiction of a curved world on a flat surface...

  8. South Carolina: Charleston County Area Project Impact Environmental Education Program (A Former EPA CARE Project)

    Science.gov (United States)

    The Charleston County Area Project Impact is the recipient of a Level II CARE cooperative agreement. The project is under the direction of the Charleston County Building Services Department, in Charleston, S.C.

  9. Clustering ERP implementation project activities: a foundation for project size definition

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Sadiq, A.; Reichert, M.; Schultz, K.; Trienekens, J.J.M.; Moller, C.; Kusters, R.J.

    2007-01-01

    The size of an ERP project can be a useful measurement for predicting the effort needed to complete an ERP implementation project. Because this measurement does not exist, research is needed to find a set of variables which can define the size of an ERP implementation project. This paper shows 21

  10. Impossible Geometric Constructions: A Calculus Writing Project

    Science.gov (United States)

    Awtrey, Chad

    2013-01-01

    This article discusses a writing project that offers students the opportunity to solve one of the most famous geometric problems of Greek antiquity; namely, the impossibility of trisecting the angle [pi]/3. Along the way, students study the history of Greek geometry problems as well as the life and achievements of Carl Friedrich Gauss. Included is…

  11. A Non-Traditional Interim Project.

    Science.gov (United States)

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  12. A Model of and for Virtual Projects

    NARCIS (Netherlands)

    Garud, R.; Kumaraswamy, A.; Tuertscher, P.R.; Cattani, G.; Ferriani, S.; Frederiksen, L.; Täube, F.

    2011-01-01

    We examine how digital technologies enable distributed actors to collaborate asynchronously on virtual projects. We use Wikipedia and associated wiki digital technology as the research site for our exploration. Our probe of the emergence of Wikipedia articles highlights a distinctive property of

  13. The integrated project as a learning experience

    Directory of Open Access Journals (Sweden)

    Maria Angeles Antequera

    2012-03-01

    Full Text Available Florida is a higher education centre specialising in technical and business training. Postgraduate programs, university qualifications, vocational training, secondary education, further education, occupational training and languages are taught at Florida. An educational model in accordance with the demands of the European Higher Education Area has been designed, focussing on teaching for professional competencies. We have chosen to use a methodology which promotes the development of skills and abilities, it promotes participation and it is student-centric as s/he must look for knowledge him/herself thus connecting the educational and the real world. In the different university degrees taught in our centre, each year the student carries out a project set in a real context which integrates specific competencies from the course subject and develops transversal competencies associated with the project which are the purpose of planning and progressive learning: team work, effective communication, conflict resolution, leadership skills, innovation and creativity. The IP counts for 25% of each course in terms of objectives, scheduling and final evaluation. The project grade is an individual grade for each student and is the same for all subjects which form part of the project.

  14. A description of the PISC project

    International Nuclear Information System (INIS)

    1979-01-01

    This report, written as an historical review of the Plate Inspection Steering Committee project, records the background of the project and refers in general to the reasons why decisions were made during the four years the project has been running. Details are given in further reports, of which the full list, issued by the Commission of the European Communities, is as follows: Report no.1 - A description of the PISC project. Report no.2 - Ultrasonic examination of the PVRC plates nos. 50/52, 51/53 and 204. Report no.3 - Destructive examination of the PVRC plates nos. 50/52, 51/53 and 204. Report no.4 - Analysis scheme of the PISC trials results. Report no.5 - Evaluation of the PISC trials results. A list of all participants is given. Data and results of the test programme are detailed in the other reports above, but to maintain confidentiality of data the individual teams have been allocated a code number known only to the team and the PISC management. Data are only identified against code numbers. A report on conclusions and recommendations of the whole PISC programme will be published by the OECD-Committee on the Safety of Nuclear Installations (CSNI) and presented at its annual meeting 1979

  15. Pushing the Limit: A Class Project

    Science.gov (United States)

    Odafe, Victor U.

    2012-01-01

    Instructors are constantly struggling to help students understand mathematical concepts as well as the relevance of mathematics to the real world. In calculus, students possess misconceptions of the limit concept. "Pushing the Limit" refers to a semester-long calculus class project that required students to read about, interview calculus…

  16. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  17. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  18. APPLICATION OF PROJECT MANAGEMENT APPROACHES AT A SMALL BUSINESSES ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Sergey V. Rajewski

    2016-01-01

    Full Text Available This article discusses the types of organizational structures of project management and their application in project management in small and medium-sized enterprises. Among the approaches and methods to organize projects emphasizing project management as part of the existing functional structure of the enterprise. Analyzed the most relevant organizational tools of project management in small business: a network schedule; matrix distribution of administrative and management tasks of the project; schedule of the project plan; information and technological methods and models used in the process of project management; software applications for project management, used in the sphere of small business.

  19. Knowledge Management in a Project Environment: Organisational CT and Project Influences

    OpenAIRE

    Polyaninova, Taya

    2011-01-01

    During a project implementation various forms of information and experience are generated within the organization. If this accumulated knowledge is not recorded and shared amongst other projects, this knowledge will be lost and no longer be available to assist future projects. This may lead to increased future projects costs as resources, time and money will be wasted on redefining the knowledge that once existed within the company. By not capturing and redeploying this knowledge, the quality...

  20. A Statistical Project Control Tool for Engineering Managers

    Science.gov (United States)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  1. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Yoder, John; Bessler, Nancy J.

    1988-01-01

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  2. A Framework for Effective Software Monitoring in Project Management

    African Journals Online (AJOL)

    A Framework for Effective Software Monitoring in Project Management. ... is shown to provide meaningful interpretation of collected metric data by embedding certain quality function. Key words: Project Management, Feedback, project control, metrics, process model, quantitative validity ... AJOL African Journals Online.

  3. When Serious Project Management is a Critical Business Requirement

    Science.gov (United States)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  4. Transforming an idea into a scholarly project.

    Science.gov (United States)

    Ng, Lillian; Cullum, Sarah; Cheung, Gary; Friedman, Susan Hatters

    2018-04-01

    This article describes components of a workshop designed to orientate psychiatric trainees to the task of conducting a scholarly project. The aims are: to promote an approach that incorporates principles of adult learning to guide trainees who are undertaking research; to allow trainees to transform their ideas into more tangible research questions; and to enable supervisors to reflect on delivering similar content in scholarly project workshops. The workshop comprised: creating a safe space to explore ideas; discussing the process of posing a question or hypothesis; using group interactions to generate concepts; and considering personal values that influence the choice of research methodology to answer a question. Examples are provided from the workshop. The process enabled trainees to generate and distil ideas into more concrete questions and methods in three phases: introductory, exploratory and tangible. Adult learning principles may assist trainees to develop their ideas for a scholarly project into research questions that are relevant to clinical practice. Harnessing the creative potential of a peer collective may encourage deeper inquiry, shifts to a tangible output and a sustained interest in research.

  5. How to Begin a Quality Improvement Project.

    Science.gov (United States)

    Silver, Samuel A; Harel, Ziv; McQuillan, Rory; Weizman, Adam V; Thomas, Alison; Chertow, Glenn M; Nesrallah, Gihad; Bell, Chaim M; Chan, Christopher T

    2016-05-06

    Quality improvement involves a combined effort among health care staff and stakeholders to diagnose and treat problems in the health care system. However, health care professionals often lack training in quality improvement methods, which makes it challenging to participate in improvement efforts. This article familiarizes health care professionals with how to begin a quality improvement project. The initial steps involve forming an improvement team that possesses expertise in the quality of care problem, leadership, and change management. Stakeholder mapping and analysis are useful tools at this stage, and these are reviewed to help identify individuals who might have a vested interest in the project. Physician engagement is a particularly important component of project success, and the knowledge that patients/caregivers can offer as members of a quality improvement team should not be overlooked. After a team is formed, an improvement framework helps to organize the scientific process of system change. Common quality improvement frameworks include Six Sigma, Lean, and the Model for Improvement. These models are contrasted, with a focus on the Model for Improvement, because it is widely used and applicable to a variety of quality of care problems without advanced training. It involves three steps: setting aims to focus improvement, choosing a balanced set of measures to determine if improvement occurs, and testing new ideas to change the current process. These new ideas are evaluated using Plan-Do-Study-Act cycles, where knowledge is gained by testing changes and reflecting on their effect. To show the real world utility of the quality improvement methods discussed, they are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). This provides an example that kidney health care professionals can use to begin their own quality improvement projects. Copyright © 2016 by the American

  6. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  7. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  8. Quantum canonical ensemble: A projection operator approach

    Science.gov (United States)

    Magnus, Wim; Lemmens, Lucien; Brosens, Fons

    2017-09-01

    Knowing the exact number of particles N, and taking this knowledge into account, the quantum canonical ensemble imposes a constraint on the occupation number operators. The constraint particularly hampers the systematic calculation of the partition function and any relevant thermodynamic expectation value for arbitrary but fixed N. On the other hand, fixing only the average number of particles, one may remove the above constraint and simply factorize the traces in Fock space into traces over single-particle states. As is well known, that would be the strategy of the grand-canonical ensemble which, however, comes with an additional Lagrange multiplier to impose the average number of particles. The appearance of this multiplier can be avoided by invoking a projection operator that enables a constraint-free computation of the partition function and its derived quantities in the canonical ensemble, at the price of an angular or contour integration. Introduced in the recent past to handle various issues related to particle-number projected statistics, the projection operator approach proves beneficial to a wide variety of problems in condensed matter physics for which the canonical ensemble offers a natural and appropriate environment. In this light, we present a systematic treatment of the canonical ensemble that embeds the projection operator into the formalism of second quantization while explicitly fixing N, the very number of particles rather than the average. Being applicable to both bosonic and fermionic systems in arbitrary dimensions, transparent integral representations are provided for the partition function ZN and the Helmholtz free energy FN as well as for two- and four-point correlation functions. The chemical potential is not a Lagrange multiplier regulating the average particle number but can be extracted from FN+1 -FN, as illustrated for a two-dimensional fermion gas.

  9. Distributing Resources in a Construction Project

    DEFF Research Database (Denmark)

    Axel, Erik

    2015-01-01

    In the present paper the status of theories are discussed. It will be based on the fact that our understanding comes out of our common activity, and we will take point of departure in some empirical material from a construction project. We shall explore a conception of conflictual cooperation, wh...... that accordingly theories must change with the process, that they are dissolving in praxis. Keywords: arrangement, common cause, concept, conflictual cooperation, contradictions, design of square, praxis, procedure, resources, theory....

  10. Project management: a new service delivery paradigm

    Directory of Open Access Journals (Sweden)

    G. van der Walt

    2007-07-01

    Full Text Available In line with international trends in governance, the South African Government’s initial focus on the development of policy frameworks, structures and systems in order to give effect to the values and principles of the Constitution, shifted to the most critical issue, namely service delivery. The Government became increasingly aware that a significant expansion in the scope and quality of service provision was not possible with traditional delivery settings and approaches. There is growing evidence that there is a need for a significant departure from conventional approaches and that a leap into a new service delivery paradigm is necessary. Increasingly this new paradigm highlights the need to further develop the government’s project management skills and applications with a view to achieving improved delivery capability. In this article the focus will be placed on the changing service delivery paradigm – from an “old” traditional model through the transition to a “new” paradigm. This paradigm is shaped by international and national trends and events in government. The contribution and advantages of project management applications for effective governance are highlighted and the article concludes with an explanation of project management organisational arrangements necessary to support the new paradigm.

  11. Integrative Bioethics: A Conceptually Inconsistent Project.

    Science.gov (United States)

    Ivanković, Viktor; Savić, Lovro

    2016-06-01

    This article provides a critical evaluation of the central components of Integrative Bioethics, a project aiming at a bioethical framework reconceptualization. Its proponents claim that this new system of thought has developed a better bioethical methodology than mainstream Western bioethics, a claim that we criticize here. We deal especially with the buzz words of Integrative Bioethics - pluriperspectivism, integrativity, orientational knowledge, as well as with its underlying theory of moral truth. The first part of the paper looks at what the claims of a superior methodology consist in. The second reveals pluriperspectivism and integrativity to be underdeveloped, hazy terms, but which seem to be underpinned by two theses - the incommensurability and the inclusiveness theses. These theses we critically scrutinize. We then consider strategies the project's proponents might apply to curb these theses in order to acquire minimal consistency for their framework. This part of the article also deals with the conception of moral truth that drives the theory, a position equally burdened with inconsistencies. In the last part of the article, we observe the concept of orientational knowledge, and develop two interpretations of its possible meaning. We claim that, following the first interpretation, Integrative Bioethics is completely descriptive, in which case it is informative and important, but hardly bioethics; if it is normative, following the second interpretation, it is bioethics as we already know it, but merely clad in rhetorical embellishments. We conclude that there is nothing new about this project, and that its inconsistencies are reason enough for its abandonment. © 2015 John Wiley & Sons Ltd.

  12. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  13. The Ranger project - a case study

    International Nuclear Information System (INIS)

    Young, R.I.

    1983-01-01

    Ranger Uranium Mines Pty. Ltd. operates an open pit mine and ore treatment plant in the Northern Territory designed to produce 3000 tonne/yr of U 3 O 8 from 3500 tonne/day of mill feed. The construction of the project was completed in 1981. Wright-Davy were the project managers and designers of the $270 million ore treatment plant and associated infrastructure. Details of project cost, staffing, project design and project systems are given

  14. Correcting a Persistent Manhattan Project Statistical Error

    Science.gov (United States)

    Reed, Cameron

    2011-04-01

    In his 1987 autobiography, Major-General Kenneth Nichols, who served as the Manhattan Project's ``District Engineer'' under General Leslie Groves, related that when the Clinton Engineer Works at Oak Ridge, TN, was completed it was consuming nearly one-seventh (~ 14%) of the electric power being generated in the United States. This statement has been reiterated in several editions of a Department of Energy publication on the Manhattan Project. This remarkable claim has been checked against power generation and consumption figures available in Manhattan Engineer District documents, Tennessee Valley Authority records, and historical editions of the Statistical Abstract of the United States. The correct figure is closer to 0.9% of national generation. A speculation will be made as to the origin of Nichols' erroneous one-seventh figure.

  15. The Narssaq-project - a geochemical, ecological environmental research project

    International Nuclear Information System (INIS)

    Soerensen, H.; Rose-Hansen, J.

    1978-01-01

    Two types of mineral occurrences near the town of Narssaq in South Greenland are recorded to be worth mining in the near future: the uranium occurrences at Kvanefjeld in the northern part of the Ilimaussaq intrusion and the zirconium occurrences in the southern part on the south coast of the Kangerdluarssuk fjord. Consideration of the environment plays a large part in discussions regarding the exploitation of these minerals. A report is given of the geochemical, ecological environmental investigations carried out at Narssaq since 1974. (BP)

  16. Bomber Deployments: A New Power Projection Strategy

    Science.gov (United States)

    2016-08-21

    AIR COMMAND AND STAFF COLLEGE DISTANCE LEARNING AIR UNIVERSITY BOMBER DEPLOYMENTS: A NEW POWER PROJECTION STRATEGY by...operating base (FOB), main operating base ( MOB ) and intermediate staging base (ISB).10 Each type of base requires certain actions to make it suitable for...closure of many main operating bases ( MOB ) overseas and the reluctance of many nations to permit permanent military bases on their soil.”15 This

  17. A project manager's primer on data validation

    International Nuclear Information System (INIS)

    Ramos, S.J.

    1991-01-01

    While carrying out their central responsibility of conducting an environmental investigation in a high- quality, timely, and cost-effective manner, project managers also face a significant challenge due to the many inherent uncertainties associated with characterizing and remediating sites. From all aspects and considerations (health and financial risks; and technical, professional, and legal defensibility/credibility), the project manager must minimize the uncertainty associated with making decisions based on environmental data. A key objective for every project manager is to produce sufficient data of known and acceptable quality. In simple terms, the level of confidence in the gathered data directly relates to: (1) the upfront determination of the types and uses of the data needed (which drives the required quality of the data); (2) the ongoing verification that the prescribed methods by which the data are to be obtained and analyzed are being followed; and (3) the validation of the verified data to determine whether the preestablished data quality objectives have been met, therefore making the data adequate for their intended use(s). This paper focuses on the third clement of the equation for data quality, therefore implying that the first two elements (planning and verification) have been accomplished. The open-quotes Who,close quotes open-quotes What,close quotes open-quotes Why,close quotes open-quotes Whenclose quotes and open-quotes Howclose quotes of data validation are discussed in general terms

  18. National Storage Laboratory: a collaborative research project

    Science.gov (United States)

    Coyne, Robert A.; Hulen, Harry; Watson, Richard W.

    1993-01-01

    The grand challenges of science and industry that are driving computing and communications have created corresponding challenges in information storage and retrieval. An industry-led collaborative project has been organized to investigate technology for storage systems that will be the future repositories of national information assets. Industry participants are IBM Federal Systems Company, Ampex Recording Systems Corporation, General Atomics DISCOS Division, IBM ADSTAR, Maximum Strategy Corporation, Network Systems Corporation, and Zitel Corporation. Industry members of the collaborative project are funding their own participation. Lawrence Livermore National Laboratory through its National Energy Research Supercomputer Center (NERSC) will participate in the project as the operational site and provider of applications. The expected result is the creation of a National Storage Laboratory to serve as a prototype and demonstration facility. It is expected that this prototype will represent a significant advance in the technology for distributed storage systems capable of handling gigabyte-class files at gigabit-per-second data rates. Specifically, the collaboration expects to make significant advances in hardware, software, and systems technology in four areas of need, (1) network-attached high performance storage; (2) multiple, dynamic, distributed storage hierarchies; (3) layered access to storage system services; and (4) storage system management.

  19. Focus on energy conservation: a project list

    Energy Technology Data Exchange (ETDEWEB)

    1978-04-01

    The Urban Land Institute (ULI) has prepared the following list of outstanding energy conserving projects for the US Department of Energy. As requested by the Department, the list includes descriptions of land developments and individual buildings suggested by members of ULI and by other sources. The projects have been selected to exemplify the major energy saving techniques in use today, with emphasis on those strategies most significant for people engaged in the business of land development. To make the list a useful reference for developers and public officials, ULI has attempted to cover energy conservation in the broadest sense from overall site planning to the functioning of individual building components. Focusing too closely on the myriad types of hardware available has been avoided and examples of the basic considerations important to energy-conscious planning and design are provided. Details on some heating, ventilation and air conditioning systems are provided in order to acquaint readers with major innovations in the field.

  20. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  1. Management of Multi-projects In a Process oriented Organization

    OpenAIRE

    Macheridis, Nikos; Nilsson, Carl-Henrik

    2006-01-01

    When projects are used as an organisational platform to conduct business, a project can be the only project in the organisation or one amongst several others. The latter case is called multi-project organisation. Usually an organization with a multi-project environment has a base organisation, which can be functional, matrix structure or another. The purpose of this article is to develop a model based on a process oriented organization as a complement to functional or matrix organizational st...

  2. Maximum entropy PDF projection: A review

    Science.gov (United States)

    Baggenstoss, Paul M.

    2017-06-01

    We review maximum entropy (MaxEnt) PDF projection, a method with wide potential applications in statistical inference. The method constructs a sampling distribution for a high-dimensional vector x based on knowing the sampling distribution p(z) of a lower-dimensional feature z = T (x). Under mild conditions, the distribution p(x) having highest possible entropy among all distributions consistent with p(z) may be readily found. Furthermore, the MaxEnt p(x) may be sampled, making the approach useful in Monte Carlo methods. We review the theorem and present a case study in model order selection and classification for handwritten character recognition.

  3. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-15

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.

  4. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included

  5. Managing Complex Distance Education Projects in a Telework Environment

    Science.gov (United States)

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  6. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    Science.gov (United States)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  7. Brokerage by a Project Manager across a New Product Development Project

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Jepsen, Anna Lund; Dietrich, Perttu

    2012-01-01

    between three subtypes of brokerage: Brokerage connecting actors from the project team with actors from the various departments within the same organization (intra-organizational brokerage), brokerage connecting employees at the NPD organization with someone working in another organization (inter...... as a hub between possible suppliers for the project. We had also expected that the PM would be more involved in coordination of, to and from the project team than what we found in this study. Based on the study, it seems that some of the connections that we, based on existing knowledge, would expect...... that the management of the project in terms of linking the stakeholders takes off in the solution development phase rather than in the concept development phase which is the phase in focus in large parts of the research that has taken place in this field. Further, contrary to expectations based on existing knowledge...

  8. The Citizenship Safety Project: a pilot study.

    Science.gov (United States)

    Frederick, K; Barlow, J

    2006-02-01

    The Government White Paper Saving Lives: Our Healthier Nation (1999) provides a clear indication that accidents are a serious public health problem and have been targeted by the Department of Health as a key area for prevention over the next 10 years. School-based injury prevention programmes have been identified as one of the key settings for the implementation of the White Paper's heath promotion strategies. The Citizen Safety Project (CSP) is a peer-delivered injury prevention programme for Year 10 students (14-15 years) and Year 2 pupils (6-7 years). This paper summarizes the findings of a pilot study that assessed the feasibility of implementing the CSP in schools and of conducting a larger study. Working as part of their Personal Social Health Education lessons, 11 pairs (n = 22) of Year 10 students developed a project to take one accident prevention theme of their choice into a primary school to teach small groups of five or six Year 2 pupils (n = 55). A formative evaluation was conducted, based on interviews with Year 2 and Year 10 teachers (n = 2), and the diaries of Year 10 students. Knowledge of accident prevention and risk awareness was measured in Year 2 pupils using the Draw and Write technique, and impact on Year 10 students was measured using self-esteem and locus of control inventories. Using both statistical and thematic analysis the study concludes that the CSP is well accepted, improves knowledge in Year 2 pupils and boosts confidence in Year 10 students, while concurrently achieving key stage attainment targets. Implications of the study are discussed in terms of future research, as are recommendations with regard to modifications to the project.

  9. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  10. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study)

    OpenAIRE

    Hatem Khaleefah Al-Ageeli; Abdul Salam J. Ali Alzobaee

    2016-01-01

    The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A select...

  11. The Astronomy Genealogy Project: A Progress Report

    Science.gov (United States)

    Tenn, Joseph S.

    2016-01-01

    Although it is not yet visible, much progress has been made on the Astronomy Genealogy Project (AstroGen) since it was accepted as a project of the Historical Astronomy Division (HAD) three years ago. AstroGen will list the world's astronomers with information about their highest degrees and advisors. (In academic genealogy, your thesis advisor is your parent.) A small group (the AstroGen Team) has compiled a database of approximately 12,000 individuals who have earned doctorates with theses (dissertations) on topics in astronomy, astrophysics, cosmology, or planetary science. These include nearly all those submitted in Australia, Canada, the Netherlands, and New Zealand, and most of those in the United States (all through 2014 for most universities and all through 1990 for all). We are compiling more information than is maintained by the Mathematics Genealogy Project (MGP). In addition to name, degree, university, year of degree, and thesis advisor(s), all provided by MGP as well, we are including years of birth and death when available, mentors in addition to advisors, and links to the thesis when it is online and to the person's web page or obituary, when we can find it. We are still struggling with some questions, such as the boundaries of inclusion and whether or not to include subfields of astronomy. We believe that AstroGen will be a valuable resource for historians of science as well as a source of entertainment for those who like to look up their academic family trees. A dedicated researcher following links from AstroGen will be able to learn quite a lot about the careers of astronomy graduates of a particular university, country, or era. We are still seeking volunteers to enter the graduates of one or more universities.

  12. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  13. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    With the growth of complex projects, stakeholder involvement, and advancements in visual-based technology, metrics and KPIs (key performance indicators) are key factors in evaluating project performance. Dashboard reporting systems provide accessible project performance data, and sharing this vital data in a concise and consistent manner is a key communication responsibility of all project managers. This 3rd edition of Kerzner’s groundbreaking work includes the following updates: new sections on processing dashboard information, portfolio management PMO and metrics, and BI tool flexibility. PPT decks by chapter and a test bank will be available for use in seminar presentations and courses.

  14. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  15. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  16. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  17. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  18. A comparison of project participants and extension officers ...

    African Journals Online (AJOL)

    The study examined the perception of project participants and extension officers regarding marketing of agricultural produce in agricultural projects in the North West Province. The objective of the study was primarily to compare the perceptions of project participants and extension officers. When establishing a project, ...

  19. A pilot project on non-conventional learning

    OpenAIRE

    Fernandes, Sara; Cerone, Antonio; Barbosa, L. S.

    2013-01-01

    This poster presents a pilot project on non-conventional learning strategies based on students’ active participation in real-life FLOSS projects. The aim of the project is to validate the hypothesis that the peer-production model, which underlies most FLOSS projects, can enhance the learning-teaching process based on extensive and systematic collaborative practices.

  20. Consonance in Information System Projects: A Relationship Marketing Perspective

    Science.gov (United States)

    Lin, Pei-Ying

    2010-01-01

    Different stakeholders in the information system project usually have different perceptions and expectations of the projects. There is seldom consistency in the stakeholders' evaluations of the project outcome. Thus the outcomes of information system projects are usually disappointing to one or more stakeholders. Consonance is a process that can…

  1. Project safety as a sustainable competitive advantage.

    Science.gov (United States)

    Rechenthin, David

    2004-01-01

    To be consistently profitable, a construction company must complete projects in scope, on schedule, and on budget. At the same time, the nature of the often high-risk work performed by construction companies can result in high accident rates. Clients and other stakeholders are placing increasing pressure on companies to decrease those accident rates. Clients routinely demand copies of safety plans and evidence of past results at the "pre-qualification" or "request for proposal" stages of the procurement process. Are high accident rates and the associated costs just a part of business? Companies that deliver on scope, schedule, and budget have a competitive advantage. Is it possible for projects with low accident rates to use it as a competitive advantage? Is the value added by safety just a temporary or parity issue, or does a successful safety program offer significant advantage to the company and the client? This article concludes that in the case of a high-risk industry, such as the construction industry, an organization with a successful safety program can promote safety performance as a sustainable competitive advantage. It is a choice the company can make.

  2. Hot gas cleaning, a targeted project

    Energy Technology Data Exchange (ETDEWEB)

    Romey, I. [University of Essen, Essen (Germany)

    1998-11-01

    Advanced hot gas cleaning systems will play a key role in future integrated combined cycle technologies. IGCC demonstration plants in operation or under construction are at present equipped with conventional wet gas scrubbing and cleaning systems. Feasibility studies for those IGCC plants have shown that the total efficiency of the processes can be improved using hot gas cleaning systems. However, this technology has not been developed and tested at a technical scale. Six well-known European industrial companies and research centres jointly worked together since January 1996 on a Targeted Project `Hot Gas Cleaning` to investigate and develop new hot gas cleaning systems for advanced clean coal power generation processes. In addition project work on chemical analysis and modelling was carried out in universities in England and Germany. The latest main findings were presented at the workshop. The main project aims are summarised as follows: to increase efficiency of advanced power generation processes; to obtain a reduction of alkalis and environmental emissions e.g. SO{sub 2}, NO{sub x}, CO{sub 2} and dust; and to develop the design basis for future industrial plants based on long-term operation of laboratory, pilot and demo-plants. To cover a range of possible process routes for future hot gas cleaning systems the following research programme is under investigation: removal of trace elements by different commercial and self developed sorbents; gas separation by membranes; separation of gas turbine relevant pollutants by hot filter dust and; H{sub 2}S removal and gas dedusting at high temperatures. 13 figs.

  3. A retrospective on the LBNL PEM project

    International Nuclear Information System (INIS)

    Huber, J.S.; Moses, W.W.; Wang, G.C.; Derenzo, S.E.; Huesman, R.H.; Qi, J.; Virador, P.; Choong, W.S.; Mandelli, E.; Beuville, E.; Pedrali-Noy, M.; Krieger, B.; Meddeler, G.

    2004-01-01

    We present a retrospective on the LBNL Positron Emission Mammography (PEM) project, looking back on our design and experiences. The LBNL PEM camera utilizes detector modules that are capable of measuring depth of interaction (DOI) and places them into 4 detector banks in a rectangular geometry. In order to build this camera, we had to develop the DOI detector module, LSO etching, Lumirror-epoxy reflector for the LSO array (to achieve optimal DOI), photodiode array, custom IC, rigid-flex readout board, packaging, DOI calibration and reconstruction algorithms for the rectangular camera geometry. We will discuss the highlights (good and bad) of these developments

  4. Sismosima: A pioneer project for earthquake detection

    International Nuclear Information System (INIS)

    Echague, C. de

    2015-01-01

    Currently you can only study how earthquakes occur and minimizing their consequences, but in Sismosima are studied earthquakes for if possible issue a pre-alert. Geological and Mining Institute of Spain (IGME) launched this project that has already achieved in test the caves in which you installed meters an increase of carbon dioxide (CO 2 ) that match the shot earthquake. Now, it remains check if gas emission occurs simultaneously, before or after. If were before, a couple of minutes would be enough to give an early warning with which save lives and ensure facilities. (Author)

  5. A New Tool for Effective and Efficient Project Management

    Energy Technology Data Exchange (ETDEWEB)

    Willett, Jesse A [Washington State Univ., Pullman, WA (United States)

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  6. Introduction to the Halden project and a short overview of the MMS activities at the project

    International Nuclear Information System (INIS)

    Owre, F.

    2005-01-01

    This presentation discusses the Man Machine System (MMS) research within the Halden Reactor Project located in Norway. This project is an International collaboration and the mission of this project is to improve safety at operating nuclear plants. The research activities include human reliability, knowledge management, design and evaluation of human system interfaces and control rooms, virtual reality for design, planning and training, operation and maintenance in a competitive electricity market as well as digital system safety research

  7. A technical description of the FlexHouse Project Testbed

    DEFF Research Database (Denmark)

    Sørensen, Jens Otto

    2000-01-01

    This paper describes the FlexHouse project testbed; a server dedicated to experiments within the FlexHouse project. The FlexHouse project is a project originating from The Business Computing Research Group at The Aarhus School of Business. The purpose of the project is to identify and develop...... methods that satisfy the following three requirements. Flexibility with respect to evolving data sources. Flexibility with respect to change of information needs. Efficiency with respect to view management....

  8. Description of a project management system software tool (Sugar)

    International Nuclear Information System (INIS)

    Saito, T.

    2000-01-01

    Toshiba has developed a project management tool that can be applied to large-scale and complicated projects such as the outage of a nuclear power station. The project management tool (Sugar) which Toshiba developed is excellent in operative visibility and extendibility, and has been developed from the beginning for use in nuclear periodic-inspection project control. Here, the development circumstances of this project management tool (Sugar) and the feature are described, and an easy demonstration is provided as an example. (author)

  9. Initiating a Human Variome Project Country Node.

    Science.gov (United States)

    AlAama, Jumana; Smith, Timothy D; Lo, Alan; Howard, Heather; Kline, Alexandria A; Lange, Matthew; Kaput, Jim; Cotton, Richard G H

    2011-05-01

    Genetic diseases are a pressing global health problem that requires comprehensive access to basic clinical and genetic data to counter. The creation of regional and international databases that can be easily accessed by clinicians and diagnostic labs will greatly improve our ability to accurately diagnose and treat patients with genetic disorders. The Human Variome Project is currently working in conjunction with human genetics societies to achieve this by establishing systems to collect every mutation reported by a diagnostic laboratory, clinic, or research laboratory in a country and store these within a national repository, or HVP Country Node. Nodes have already been initiated in Australia, Belgium, China, Egypt, Malaysia, and Kuwait. Each is examining how to systematically collect and share genetic, clinical, and biochemical information in a country-specific manner that is sensitive to local ethical and cultural issues. This article gathers cases of genetic data collection within countries and takes recommendations from the global community to develop a procedure for countries wishing to establish their own collection system as part of the Human Variome Project. We hope this may lead to standard practices to facilitate global collection of data and allow efficient use in clinical practice, research and therapy. © 2011 Wiley-Liss, Inc.

  10. The Lunar Phases Project: A Mental Model-Based Observational Project for Undergraduate Nonscience Majors

    Science.gov (United States)

    Meyer, Angela Osterman; Mon, Manuel J.; Hibbard, Susan T.

    2011-01-01

    We present our Lunar Phases Project, an ongoing effort utilizing students' actual observations within a mental model building framework to improve student understanding of the causes and process of the lunar phases. We implement this project with a sample of undergraduate, nonscience major students enrolled in a midsized public university located…

  11. Applying a life cycle approach to project management methods

    OpenAIRE

    Biggins, David; Trollsund, F.; Høiby, A.L.

    2016-01-01

    Project management is increasingly important to organisations because projects are the method\\ud by which organisations respond to their environment. A key element within project management\\ud is the standards and methods that are used to control and conduct projects, collectively known as\\ud project management methods (PMMs) and exemplified by PRINCE2, the Project Management\\ud Institute’s and the Association for Project Management’s Bodies of Knowledge (PMBOK and\\ud APMBOK. The purpose of t...

  12. Project Neil Bone: a great success!

    Science.gov (United States)

    Miles, R.

    2010-08-01

    Last October, the ARPS initiated a new observing project to make photometric observations of asteroids which reach a phase angle of 0.2° or less at opposition. The stimulus for this followed the naming last year of asteroid (7102) in honour of Neil Bone, our former Meteor Section Director, who sadly died last year. It turned out that (7102) would reach opposition on January 18 this year at an unusually low phase angle - just 0.03°. This is so small an angle that if you were standing on the asteroid on this date, you would be able to see the Earth transiting across the face of the Sun! The probability that (7102) would attain such a low phase angle is about once in several hundred years. So our project was set up with a view to observing its namesake along with a selection of thirteen other asteroids, which also happened to pass through very low phase angle at their opposition during the period 2009 October-2010 March.

  13. APPLICATION OF PROJECT MANAGEMENT APPROACHES AT A SMALL BUSINESSES ENTERPRISES

    OpenAIRE

    Sergey V. Rajewski

    2016-01-01

    This article discusses the types of organizational structures of project management and their application in project management in small and medium-sized enterprises. Among the approaches and methods to organize projects emphasizing project management as part of the existing functional structure of the enterprise. Analyzed the most relevant organizational tools of project management in small business: a network schedule; matrix distribution of administrative and management tasks of the projec...

  14. Post-project market review as a tool for stimulating commercialisation of knowledge creation projects

    NARCIS (Netherlands)

    Bout, L.Y.; Lombaers, J.H.M.; Constantinides, E.; Weerd-Nederhof, P.C. de

    2009-01-01

    Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, the concept of post-project review can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von

  15. Post-Project Market Review as a Tool for Stimulating Commercialisation of Knowledge Creation Projects

    NARCIS (Netherlands)

    Bout, Y.; Lombaers, Jaap H.M.; Constantinides, Efthymios; Fisscher, O.A.M.; de Weerd-Nederhof, Petronella C.; Oakey, R.; Groen, A.; Cook, G.; van der Sijde, P.

    2009-01-01

    Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, post-project reviews can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von Zedtwitz,

  16. Location Independent Professional Project: A Pilot Study

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, J.A.; Long, J.P.; Miller, M.M.

    1999-02-01

    This pilot study project explored the problem of providing access to the nomadic worker who desires to connect a computer through network access points at a number of different locations within the SNL/NM campus as well as outside the campus. The design and prototype development gathered knowledge that may allow a design to be developed that could be extended to a larger number of SNL/NM network drop boxes. The focus was to provide a capability for a worker to access the SNL IRN from a network drop box (e.g. in a conference room) as easily as when accessing the computer network from the office normally used by the worker. Additional study was done on new methods to authenticate the off campus worker, and protect and control access to data.

  17. Initiating a nuclear power project - client's viewpoint

    International Nuclear Information System (INIS)

    Rieh, C.H.

    1985-01-01

    Based upon our experience in Korea, for any country that wants to effectively introduce nuclear plants, the authors recommend the following preparation for accepting the advanced nuclear technology prior to its implementation: training personnel, organizing domestic industries for the technology transfer, and establishing laws, regulations and licensing procedures related to nuclear development. Technical self-sufficiency in nuclear power plant construction and operation must be achieved step by step under a long term master plan. Localization, or internal self-sufficiency, is enhanced by repetitive construction of the same reactor type using a non-turnkey construction method. The project owner should, most of all, improve his management capability for the success of the project along with economic effectiveness. International cooperation among the developing countries who are introducing or planning to introduce nuclear power plant, is expected to play an important role in resolving unique problems which may commonly exist in their nuclear program. In this regard, Korea is prepared to share its accumulated experiences with other developing countries

  18. Advertising a "Healthy Lifestyle:" A Cypriot Health Education Project

    Science.gov (United States)

    Ioannou, Soula

    2006-01-01

    This paper describes a health education program entitled "Young Consumer" project, financed by the European Union and implemented by the Cyprus Consumer Association between March and June 2004. The aim of the project was to promote a healthy lifestyle among a group of Cypriot primary school pupils (11-12 years old). Participants were…

  19. A ProCoS II Project Final Report: ESPRIT Basic Research project 707

    DEFF Research Database (Denmark)

    Bowen, J. P.; Hoare, C. A. R.; Langmaack, Hans

    1996-01-01

    An overview of the research and associated activities of the Europeancollaborative ESPRIT Basic Research ProCoS II project (no. 7071) on``Provably Correct Systems'' which ran from 1992 to 1995 is presented.This was a follow-on project to ProCoS (no. 3104) and ran inparallel with the ProCoS Working...

  20. JPL Year 2000 Project. A Project Manager's Observations: Y2k

    Science.gov (United States)

    Mathison, Richard P. (Technical Monitor)

    1999-01-01

    This paper presents observations from a project manager on the Y2K problem. The topics include: 1) Agenda: 2) Scope; 3) Project Organization; 4) The Fixes; 5) The Toughest Part; 6) Validation versus Time; and 7) Information Sources. This paper is in viewgraph form.

  1. BEESMART – A CROWDSOURCING PROJECT WITH SMARTPHONES

    Directory of Open Access Journals (Sweden)

    E. Gülch

    2016-06-01

    Full Text Available The project Beesmart aims at the derivation of a geolocation yield catalogue for honey bees by using a crowd-sourcing approach with the help of smartphones. A central issue are thus the design of an application (App2bee for smartphones and the design of a software for flower recognition, which uses sensor information of the smart phone and information about blooming times to recognize and localise flowers. The implemented flower recognition is based on the approach “Minimal-bag-of-visual-Words“. A classification accuracy of about 60-70% can be reached, which is of course affected by the big variety of flowers, by the way on how images are taken and how the image quality and resolution actually are. The classification results are further improved by applying apriori a simple manual segmentation on the touch screen to put the focus in the image on the flower in question. The design and the functionality of the App2Bee are presented followed by details on the communication, database and Web-portal components. In a second part of the project the classification of larger areas of flowers important for honey bees are investigate using a fixed-wing UAV system with two different types of cameras, a RGB digital camera and a NIR digital camera. It is certainly not possible to recognize single flowers, but it could be shown, that larger fields of the same flower, like e.g. Red Clover, can be classified with this approach. With the data available it was also possible to classify bare-ground, roads, low pasture, high pasture as well as mixed pasture. For the high pasture it was possible to automatically identify clusters of flowers, like Yarrow.

  2. Evolution of project management research: a bibliometric study of International Journal of Project Management

    Directory of Open Access Journals (Sweden)

    Fábio Cocchi da Silva Eiras

    2017-03-01

    Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.

  3. European project for a multinational macrosectoral model

    Energy Technology Data Exchange (ETDEWEB)

    d' Alcantara, G; Italianer, A

    1984-01-01

    This paper describes the HERMES project, a multinational macrosectoral European econometric modelling effort, sponsored by the Directorates General II (Economic and Financial Affairs), XII (Science, Research and Development), XVII (Energy) and the SOEC. The set-up of the model is sketched against the background of problems of growth, unemployment, inflation, trade balances, government balances and energy policy. Although the definitions of the variables and a complete specification of the model are given in the Appendix, the major features of the model are described extensively in the text. These include private and collective consumption (incl. a consumer demand system), the putty-clay production process, price and wage formation, sectoral bilateral trade flows and integrated energy economy modelling.

  4. The Chlamydomonas genome project: a decade on

    Science.gov (United States)

    Blaby, Ian K.; Blaby-Haas, Crysten; Tourasse, Nicolas; Hom, Erik F. Y.; Lopez, David; Aksoy, Munevver; Grossman, Arthur; Umen, James; Dutcher, Susan; Porter, Mary; King, Stephen; Witman, George; Stanke, Mario; Harris, Elizabeth H.; Goodstein, David; Grimwood, Jane; Schmutz, Jeremy; Vallon, Olivier; Merchant, Sabeeha S.; Prochnik, Simon

    2014-01-01

    The green alga Chlamydomonas reinhardtii is a popular unicellular organism for studying photosynthesis, cilia biogenesis and micronutrient homeostasis. Ten years since its genome project was initiated, an iterative process of improvements to the genome and gene predictions has propelled this organism to the forefront of the “omics” era. Housed at Phytozome, the Joint Genome Institute’s (JGI) plant genomics portal, the most up-to-date genomic data include a genome arranged on chromosomes and high-quality gene models with alternative splice forms supported by an abundance of RNA-Seq data. Here, we present the past, present and future of Chlamydomonas genomics. Specifically, we detail progress on genome assembly and gene model refinement, discuss resources for gene annotations, functional predictions and locus ID mapping between versions and, importantly, outline a standardized framework for naming genes. PMID:24950814

  5. Knowledge Utilization in Projectsa Practice-based

    DEFF Research Database (Denmark)

    Thuesen, Christian

    Drawing upon Practice-based theorizing in general and Actor Network Theory and theories of Communities of Practices in particular the paper develops an analytical strategy for understanding “life” in projects. The analytical strategy is applied on empirical material from an 18-month ethnographic...... study of a construction project. The project is interpreted as constellation of networked practices, which always is in the making. Participation in this project is a learning process where existing practices are reproduced and developed. This understanding of “life” in the project, frames a concluding...... analysis and discussion of the utilization of knowledge in the project....

  6. A Pilot Astronomy Outreach Project in Bangladesh

    Science.gov (United States)

    Bhattacharya, Dipen; Mridha, Shahjahan; Afroz, Maqsuda

    2015-08-01

    In its strategic planning for the "Astronomy for Development Project," the International Astronomical Union (IAU) has ecognized, among other important missions, the role of astronomy in understanding the far-reaching possibilities for promoting global tolerance and citizenship. Furthermore, astronomy is deemed inspirational for careers in science and technology. The "Pilot Astronomy Outreach Project in Bangladesh"--the first of its kind in the country--aspires to fulfill these missions. As Bangladesh lacks resources to promote astronomy education in universities and schools, the role of disseminating astronomy education to the greater community falls on citizen science organizations. One such group, Anushandhitshu Chokro (AChokro) Science Organization, has been carrying out a successful public outreach program since 1975. Among its documented public events, AChokro organized a total solar eclipse campaign in Bangladesh in 2009, at which 15,000 people were assembled in a single open venue for the eclipse observation. The organization has actively pursued astronomy outreach to dispel public misconceptions about astronomical phenomena and to promote science. AChokro is currently working to build an observatory and Science Outreach Center around a recently-acquired 14-inch Scmidt-Cassegrain telescope and a soon-to-be-acquired new 16-inch reflector, all funded by private donations. The telescopes will be fitted with photometers, spectrometers, and digital and CCD cameras to pursue observations that would include sun spot and solar magnetic fields, planetary surfaces, asteroid search, variable stars and supernovae. The Center will be integrated with schools, colleges, and community groups for regular observation and small-scale research. Special educational and observing sessions for adults will also be organized. Updates on the development of the Center, which is expected to be functioning by the end of 2015, will be shared and feedback invited on the fostering of

  7. Project and construction of a digital chronoanalyser

    International Nuclear Information System (INIS)

    Cavalcante, M.A.

    1983-01-01

    The project, the construction and the operation tests of a new electronic system for measuring half-lives of nuclear excited states in the range from 10 -7 to 10 -5 seconds are presented. The proposed method uses logic circuits of the TTL family. The time scale is obtained from a phase locked-loop quartz oscillator; the formation instant of excited state of interest is obtained by JK flip-flop through its negative transition edge. This system uses ten channels of frequency counters, controlled by logic gates, to measure successively gamma rays emitted between the instant of birth of an excited state and its de excitation time. The performance of system was verified by gamma ray decay from 137 Cs and 60 Co. (Author) [pt

  8. Teaching Small Group Communication: A Do Good Project

    Directory of Open Access Journals (Sweden)

    Elizabeth M. Minei, PhD

    2016-08-01

    Full Text Available This paper focuses on the parameters of a semester-long project called the “Do Good” project, geared towards developing small group communication skills in undergraduate students. This project highlights participation in a social engagement project that allows students to bridge concepts learned in small group communication lectures (e.g., team dynamics, project management, conflict resolution, decision making, leadership with community outreach. Included are an overview of the project, and examples for how each component both challenges students’ ability to communicate in groups and provides motivation that foster students’ ability to link in-class knowledge with practical, real world application.

  9. Design of a projection display screen with vanishing color shift for rear-projection HDTV

    Science.gov (United States)

    Liu, Xiu; Zhu, Jin-lin

    1996-09-01

    Using bi-convex cylinder lens with matrix structure, the transmissive projection display screen with high contrast and wider viewing angle has been widely used in large rear projection TV and video projectors, it obtained a inhere color shift and puzzled the designer of display screen for RGB projection tube in-line adjustment. Based on the method of light beam racing, the general software of designing projection display screen has been developed and the computer model of vanishing color shift for rear projection HDTV has bee completed. This paper discussed the practical designing method to vanish the defect of color shift and mentioned the relations between the primary optical parameters of display screen and relative geometry sizes of lens' surface. The distributions of optical gain to viewing angle and the influences on engineering design are briefly analyzed.

  10. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  11. Adopt-a-Nonprofit: A Project in Persuasion and Collaboration.

    Science.gov (United States)

    Spears, Lee A.

    1996-01-01

    Describes a project for professional writing classes that teaches effective persuasive writing, as teams of students research local nonprofit or campus service organizations, design projects to address their groups' main needs, and write solicitation letters for donations or volunteers. Discusses potential problems and how students benefit. (SR)

  12. Combining AHP and DEA Methods for Selecting a Project Manager

    Directory of Open Access Journals (Sweden)

    Baruch Keren

    2014-07-01

    Full Text Available A project manager has a major influence on the success or failure of the project. A good project manager can match between the strategy and objectives of the organization and the goals of the project. Therefore, the selection of the appropriate project manager is a key factor for the success of the project. A potential project manager is judged by his or her proven performance and personal qualifications. This paper proposes a method to calculate the weighted scores and the full rank of candidates for managing a project, and to select the best of those candidates. The proposed method combines specific methodologies: the Data Envelopment Analysis (DEA and the Analytical Hierarchical Process (AHP and uses DEA Ranking Methods to enhance selection.

  13. Building an Experiential Learning Model for a Project Management Course

    Science.gov (United States)

    Chen, Kuan C.; Chuang, Keh-Wen

    2009-01-01

    Teaching students to become project management professionals requires a real world experience. Incorporating live clients into student projects, instead of using case studies or mock companies, adds a dimension that exposes students to the realities of project management. This paper will describe a structured methodology used in a project…

  14. Case study B. Architectural design management using a project web

    NARCIS (Netherlands)

    DeClerck, F.; Pels, H.J.; Otter, den A.F.H.J.; Emmitt, S.; Prins, M.; Otter, den A.F.

    2009-01-01

    In this chapter the use and organization of use of a project website is described in the design and realization of a construction project. The case concerns a complicated project with a high number of different parties involved, managed by an architectural office and having an internationally

  15. A clinical molecular scanner: the Melanie project.

    Science.gov (United States)

    Hochstrasser, D F; Appel, R D; Vargas, R; Perrier, R; Vurlod, J F; Ravier, F; Pasquali, C; Funk, M; Pellegrini, C; Muller, A F

    1991-01-01

    We developed an expert system to analyze and interpret protein maps. This system, Melanie (medical electrophoresis analysis interactive expert), can distinguish between normal and cirrhotic liver and identify various types of cancer on the basis of protein patterns in biopsy specimens. Our findings suggest that some diseases associated with toxic compounds or modifications of the human genome can be diagnosed by expert systems that analyze protein maps. The combination of protein mapping and computer analysis could result in a clinically useful "molecular scanner". The massive amount of information analyzed and stored in such studies requires new strategies, including centralized databases and image transmission over networks. Increased understanding of protein expression and regulation will enhance the importance of the human genome project in medicine and biology.

  16. The DIALOGUE project: The right decision? A sociological evaluation of the project

    International Nuclear Information System (INIS)

    Sundqvist, G.

    1993-11-01

    The DIALOGUE project has been conducted by the Swedish Nuclear Power Inspectorate (SKI) since 1990. The aim of the project was to stimulate a dialogue between different interest groups within Sweden. The purpose of this dialogue was to establish a licensing process, prior to a future licensing of a repository for spent nuclear waste, in which several of the parties involved are reasonably confident. The DIALOGUE project was carried out with the participation of other government agencies, municipalities and environmental groups and was headed by the former chairman of the National Licensing Board for Environmental Protection

  17. Project Redirection: making and measuring a difference.

    Science.gov (United States)

    Quint, J C

    1990-01-01

    Between 1980-86, a comprehensive program for disadvantaged adolescent mothers =or 17 years old, designed to increase their self-esteem and skills leading to use of available social services and ultimately self-sufficiency, operated in community agencies in Boston, Massachusetts; Harlem in New York City; Phoenix, Arizona; and Riverside, California. Services were workshops, group and individual counseling, recreational activities, transportation assistance, child care, and activities with community women who acted as confidants and mentors. Topics of the workshops and counseling sessions included employability development, health, education, and life management. Each participant, her community woman, and program staff outlined an Individual Participant Plan based on her strengths and needs. The project did not duplicate services already existing in the community and referred the young mothers too those services as needed. The impact analysis showed the participants exhibited continuity and change over time. After 5 years, they were more likely to be economically self-sufficient (mean weekly earnings, $68 vs. $45, p.1; Aid to Families with Dependent Children recipients, 49% vs. 59%) and had better parenting skills (mean home environment score 44 vs. 40, p.001) than nonparticipants. According to the Behavior Problem Index, children of participants exhibited much better behavior than those of nonparticipants (score 50 vs. 20, p.001). On the other hand, the project did not result in better educational attainment. Participants had the same percentage of young women who had a diploma or GED after 5 years as did nonparticipants (48%). In addition, 73% experienced at least 1 subsequent birth within the 5 years after participation. Participants had more children than nonparticipants (2.4 vs. 2, p.01) mainly because they chose not to terminate their pregnancies. Perhaps this occurred because they received immediate emotional rewards from parenting. 66% of participants were not

  18. The Difficulty in Following Project Schedule as a Key Project Management Challenge: Family Firm Perspective

    Directory of Open Access Journals (Sweden)

    Joanna SADKOWSKA

    2016-12-01

    Full Text Available The problem of how to manage projects successfully has been gaining growing interest for the last decades. The aforementioned is mainly caused by the fact that project management offers a wide range of methods and tools which, when properly used, can stimulate long-term growth of businesses. As a consequence it offers a particular development opportunity for family enterprises which, due to their specificity, have to overcome many difficulties. The primary objective of this paper is to examine whether family enterprises perceive, and to what extent, the factor of following project schedule as a difficulty in the area of project management. 154 Polish family firms representing different sectors were surveyed. The results of regression analysis show that family firms with global range of business activities, on the contrary to those with local or regional ones, do not find the factor of following project schedule as a difficulty. This results manly from the tools employed and the maturity level they have reached in project management. The findings support the current discussion on the specificity and uniqueness of family businesses in relationship to the knowledge area of project management. It also contributes to filling the gap on understanding the functioning of family firms in the emerging economies of Eastern Europe.

  19. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  20. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  1. A Multi-Class, Interdisciplinary Project Using Elementary Statistics

    Science.gov (United States)

    Reese, Margaret

    2012-01-01

    This article describes a multi-class project that employs statistical computing and writing in a statistics class. Three courses, General Ecology, Meteorology, and Introductory Statistics, cooperated on a project for the EPA's Student Design Competition. The continuing investigation has also spawned several undergraduate research projects in…

  2. Modelling in Evaluating a Working Life Project in Higher Education

    Science.gov (United States)

    Sarja, Anneli; Janhonen, Sirpa; Havukainen, Pirjo; Vesterinen, Anne

    2012-01-01

    This article describes an evaluation method based on collaboration between the higher education, a care home and university, in a R&D project. The aim of the project was to elaborate modelling as a tool of developmental evaluation for innovation and competence in project cooperation. The approach was based on activity theory. Modelling enabled a…

  3. A critical evaluation of the strategy project

    International Nuclear Information System (INIS)

    Howard, B.J.; Liland, A.

    2003-01-01

    Full text: Experience after the Chernobyl accident has shown that remediation strategies need to consider a wide range of different issues to ensure the long-term sustainability of radioactively contaminated areas. The STRATEGY project (Sustainable Restoration And Long-Term Management Of Contaminated Rural, Urban And Industrial Ecosystems (www.strategy-ec.org.uk) had the overall objective of establishing a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management of contaminated areas in Western Europe. The project carried out a critical evaluation of a series of countermeasures and waste disposal options including a consideration of their technical feasibility and practicality and whether they (i) incur considerable direct or side-effect costs; (ii) have significant environmental side effects; and (iii) are acceptable to society. A main output was a comprehensive, documented evaluation of more than 100 countermeasures (in the form of standardized templates) that would be relevant for off-site nuclear emergency management in the mid to long term. Stakeholder participation is an important mechanism to explore these additional benefits or disadvantages to the use of countermeasures, and is an essential step in developing a decision framework which avoids problems previously experienced in emergency management. Close liaison with the FARMING stakeholder network facilitated evaluation of countermeasure templates for rural ecosystems. Stakeholder opinion suggested that some countermeasures were as likely to be rejected an socio-ethical grounds as technical and economic grounds. Rejection of specific countermeasures would be expected to show site, context and national differences. Suitable approaches for successfully communicating with a wide range of stakeholders were explored. The way in which countermeasure evaluation and selection is carried out is particularly relevant for ethical evaluation of remediation

  4. A PERSPECTIVE ON PRIORITIZATION IN PROJECT PORTFOLIO ENVIRONMENT

    OpenAIRE

    Eberhardt, Henrik; Lindblom, David

    2011-01-01

    The overbridging aspect of this interpretative master thesis is the implementation of a project prioritizing strategy. The concept is subdivided into three processes and entities, which could be seen as tools; project management office(PMO), project evaluation and project selection, which in turn are discussed separately. The thesis investigates how the tools impact the prioritizing strategy and why a company must follow a certain prioritizing strategy. The primary focus has been an IS/IT dep...

  5. A framework to improve performance measurement in engineering projects

    OpenAIRE

    Zheng , Li; Baron , Claude; Esteban , Philippe; Xue , Rui; Zhang , Qiang

    2017-01-01

    International audience; A wide range of methods and good practices have been developed for the measurement of projects performance. They help project managers to effectively monitor the project progress and evaluate results. However, from a literature review, we noticed several remaining critical issues in measuring projects performance, such as an unbalanced development of Key Performance Indicators types between lagging and leading indicators. On the other hand, systems engineering measurem...

  6. A transportation-scheduling system for managing silvicultural projects

    Science.gov (United States)

    Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald

    2005-01-01

    A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...

  7. IT Project Management from a Systems Thinking Perspective

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    Purpose: We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. Systems Thinking is a holistic problem solving method in which system behaviour emerges from the interaction of system components.

  8. Weaving Social Media into a Business Proposal Project

    Science.gov (United States)

    Li, Xiaoli

    2012-01-01

    Given that students are enthusiastic about social media or even have expertise in some social media tools, the author decided to design a class project in her Writing for Careers (Business Communication) class that integrates social media in terms of content and project management. This article intends to describe such a class project design as…

  9. Project SAIL: A Summer Program Brings History Alive for Students.

    Science.gov (United States)

    Hollingsworth, Patricia

    2001-01-01

    This project describes Project SAIL (Schools for Active Interdisciplinary Learning), a federally funded project providing in-depth staff development during a 3-week summer program for teachers, parents, and their gifted/talented economically disadvantaged students. The program theme, "Searching for Patterns in History," has been used with students…

  10. Egg Yolk Lecithin: A Biochemical Laboratory Project

    Science.gov (United States)

    White, Bernard J.; And Others

    1974-01-01

    Describes an undergraduate laboratory project involving lecithin which integrates two general aspects of lipid methodology: chromatographic techniques and use of enzymes specificity to obtain structural information. (Author/SLH)

  11. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  12. A European Project SysPAQ

    OpenAIRE

    Muller , Birgit; Dahms , Arne; Muller , Dirk; Knudsen , Henrik; Afshari , Alireza; Wargocki , Pawel; Olesen , Bjarne; Berglund , Brigitta; Ramalho , Olivier; Goschnick , Joachim; Jann , Oliver; Horn , Wolfgang; Nesa , Daniel; Chanier , Eric; Ruponen , Mika

    2007-01-01

    International audience; The European research project Innovative Sensor System for Measuring Perceived Air Quality and Brand Specific Odours (SysPAQ) is started under the VIth framework programme under the work programme "New and Emerging Science and Technology" (NEST PATHFINDER "Measuring the Impossible"). The Kick-of of the project was on the first of September 2006. Ten partners (3 Companies, 3 Universities, 4 research Institutes) from 5 countries are involved. The main goal of this projec...

  13. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  14. A policy for development of project management. Projektijuhtimise arendamise poliitika

    Directory of Open Access Journals (Sweden)

    Arvi Kuura

    2013-01-01

    Full Text Available The share of temporary tasks and activities organised through projects and/or programmes is increasing in modern societies and also in businesses, non-profit and public organisations. To manage an increasing load of projects and programmes, the majority of organisations employ more skilled project management professionals and develop their project management capabilities. Against that background, most governments globally have not paid much attention to the development of project management. In other words, the project management capability (or maturity has not been a macro-level or policy concern. The article explores the importance of project management capabilities and the need for suitable policies, and outlines a policy for the development of project management

  15. Mark 4A project training evaluation

    Science.gov (United States)

    Stephenson, S. N.

    1985-11-01

    A participant evaluation of a Deep Space Network (DSN) is described. The Mark IVA project is an implementation to upgrade the tracking and data acquisition systems of the dSN. Approximately six hundred DSN operations and engineering maintenance personnel were surveyed. The survey obtained a convenience sample including trained people within the population in order to learn what training had taken place and to what effect. The survey questionnaire used modifications of standard rating scales to evaluate over one hundred items in four training dimensions. The scope of the evaluation included Mark IVA vendor training, a systems familiarization training seminar, engineering training classes, a on-the-job training. Measures of central tendency were made from participant rating responses. Chi square tests of statistical significance were performed on the data. The evaluation results indicated that the effects of different Mark INA training methods could be measured according to certain ratings of technical training effectiveness, and that the Mark IVA technical training has exhibited positive effects on the abilities of DSN personnel to operate and maintain new Mark IVA equipment systems.

  16. Mark 4A project training evaluation

    Science.gov (United States)

    Stephenson, S. N.

    1985-01-01

    A participant evaluation of a Deep Space Network (DSN) is described. The Mark IVA project is an implementation to upgrade the tracking and data acquisition systems of the dSN. Approximately six hundred DSN operations and engineering maintenance personnel were surveyed. The survey obtained a convenience sample including trained people within the population in order to learn what training had taken place and to what effect. The survey questionnaire used modifications of standard rating scales to evaluate over one hundred items in four training dimensions. The scope of the evaluation included Mark IVA vendor training, a systems familiarization training seminar, engineering training classes, a on-the-job training. Measures of central tendency were made from participant rating responses. Chi square tests of statistical significance were performed on the data. The evaluation results indicated that the effects of different Mark INA training methods could be measured according to certain ratings of technical training effectiveness, and that the Mark IVA technical training has exhibited positive effects on the abilities of DSN personnel to operate and maintain new Mark IVA equipment systems.

  17. Learning from project experiences using a legacy-based approach

    Science.gov (United States)

    Cooper, Lynne P.; Majchrzak, Ann; Faraj, Samer

    2005-01-01

    As project teams become used more widely, the question of how to capitalize on the knowledge learned in project teams remains an open issue. Using previous research on shared cognition in groups, an approach to promoting post-project learning was developed. This Legacy Review concept was tested on four in tact project teams. The results from those test sessions were used to develop a model of team learning via group cognitive processes. The model and supporting propositions are presented.

  18. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  19. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  20. Creating a Realistic Context for Team Projects in HCI

    NARCIS (Netherlands)

    Koppelman, Herman; van Dijk, Betsy

    2006-01-01

    Team projects are nowadays common practice in HCI education. This paper focuses on the role of clients and users in team projects in introductory HCI courses. In order to provide projects with a realistic context we invite people from industry to serve as clients for the student teams. Some of them

  1. The CTQ flowdown as a conceptual model of project objectives

    NARCIS (Netherlands)

    de Koning, H.; de Mast, J.

    2007-01-01

    The purpose of this article is to describe and clarify a tool that is at the core of the definition phase of most quality improvement projects. This tool is called the critical to quality (CTQ) flowdown. It relates high-level strategic focal points to project objectives. In their turn project

  2. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Leus, R.; Wullink, Gerhard; Hans, Elias W.; Herroelen, W.

    2004-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. A positioning framework is proposed to distinguish between different types of project-driven organisations, which is meant to aid project management in the choice between the

  3. Focusing innovation projects on promoting well-being: A toolkit

    NARCIS (Netherlands)

    Steen, M.G.D.; Luiten, H.

    2014-01-01

    Increasingly, private and public organizations are organizing innovation projects that aim to promote people’s wellbeing. In order to better focus such projects on this goal, we developed a (prototype) tool, based on the Capability Approach (CA). It is intended to help people in innovation projects

  4. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Hans, Elias W.; Herroelen, W.; Wullink, Gerhard; Leus, R.

    2007-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. Based on these viewpoints we propose a positioning framework to distinguish between different types of project-driven organisations. This framework is meant to aid project

  5. Tools for Monitoring Social Media: A Marketing Research Project

    Science.gov (United States)

    Veeck, Ann; Hoger, Beth

    2014-01-01

    Knowledge of how to effectively monitor social media is an increasingly valued marketing research skill. This study tests an approach for adding social media content to an undergraduate marketing research class team project. The revised project maintains the expected objectives and parameters of a traditional research project, while integrating…

  6. Mt. Apo geothermal project : a learning experience in sustainable development

    International Nuclear Information System (INIS)

    Ote, Leonardo M.; De Jesus, Agnes C.

    1997-01-01

    The Mt. Apo geothermal project, a critical component of the Philippine energy program met stiff opposition from 1988-1991. Seemingly unresolvable legal, environmental and cultural issues between the government developer, the Philippine National Oil Company-Energy Development Corporation (PNOC-EDC) and various affected sectors delayed the project for two years. The paper discusses the efforts undertaken by the developer to resolve these conflicts through a series of initiatives that transformed the project into a legally, environmentally and socially acceptable project. Lastly, the PNOC-EDC experience has evolved a new set of procedures for the environmental evaluation of development project in the Philippines. (author)

  7. A low complexity reweighted proportionate affine projection algorithm with memory and row action projection

    Science.gov (United States)

    Liu, Jianming; Grant, Steven L.; Benesty, Jacob

    2015-12-01

    A new reweighted proportionate affine projection algorithm (RPAPA) with memory and row action projection (MRAP) is proposed in this paper. The reweighted PAPA is derived from a family of sparseness measures, which demonstrate performance similar to mu-law and the l 0 norm PAPA but with lower computational complexity. The sparseness of the channel is taken into account to improve the performance for dispersive system identification. Meanwhile, the memory of the filter's coefficients is combined with row action projections (RAP) to significantly reduce computational complexity. Simulation results demonstrate that the proposed RPAPA MRAP algorithm outperforms both the affine projection algorithm (APA) and PAPA, and has performance similar to l 0 PAPA and mu-law PAPA, in terms of convergence speed and tracking ability. Meanwhile, the proposed RPAPA MRAP has much lower computational complexity than PAPA, mu-law PAPA, and l 0 PAPA, etc., which makes it very appealing for real-time implementation.

  8. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of

  9. only: A Case Study In Projective Meaning

    Directory of Open Access Journals (Sweden)

    Craige Roberts

    2010-12-01

    Full Text Available I offer an integrated theory of the meaning of only in which the prejacent, while not presupposed, is both entailed and backgrounded, hence tends to project (following a general proposal about projection due to Simons et al. 2010. Moreover, I argue, contra Beaver & Brady (2008, that only is not conventionally associated with focus, the focus effects arising instead pragmatically. But I do adopt aspects of their semantics for only, including the presupposition of a pre-order over the elements of its domain.ReferencesAbbott, B. 2000. ‘Presuppositions as non-assertions’. Journal of Pragmatics 32: 1419–37.http://dx.doi.org/10.1016/S0378-2166(9900108-3Abbott, B. 2008. ‘Presuppositions and common ground’. Linguistics and Philosophy 31: 523–538.http://dx.doi.org/10.1007/s10988-008-9048-8Amaral, P. 2010. ‘Entailment, assertion, and textual coherence: the case of almost and barely’. Linguistics 48, no. 3: 525–545.http://dx.doi.org/10.1515/LING.2010.016Amaral, P., Roberts, C. & Allyn Smith, E. 2008. ‘Review of The Logic of Conventional Implicature by Chris Potts’. Linguistics and Philosophy 30: 707–749.http://dx.doi.org/10.1007/s10988-008-9025-2Atlas, J. D. 1993. ‘The importance of being “only”: testing the neo-Gricean versus neoentailment paradigms’. Journal of Semantics 10: 301–18.http://dx.doi.org/10.1093/jos/10.4.301Beaver, D. 2001. Presupposition and Assertion in Dynamic Semantics. CSLI Publications, Stanford, CA.Beaver, D. 2010. ‘Handout from a talk on projective meaning’. Stuttgart, Germany.Beaver, D. & Brady, C. 2003. ‘Always and Only: Why not all focus sensitive operators are alike’. Natural Language Semantics 11: 323–62.http://dx.doi.org/10.1023/A:1025542629721Beaver, D. & Brady, C. 2008. Sense and Sensitivity. Blackwell.http://dx.doi.org/10.1002/9781444304176Beckman, M. E. & Ayers, G. M. 1994. ‘Guidelines for ToBI labeling guide, ver. 2.0’. On-line at The Ohio State University: www

  10. Projecting surgeon supply using a dynamic model.

    Science.gov (United States)

    Fraher, Erin P; Knapton, Andy; Sheldon, George F; Meyer, Anthony; Ricketts, Thomas C

    2013-05-01

    To develop a projection model to forecast the head count and full-time equivalent supply of surgeons by age, sex, and specialty in the United States from 2009 to 2028. The search for the optimal number and specialty mix of surgeons to care for the United States population has taken on increased urgency under health care reform. Expanded insurance coverage and an aging population will increase demand for surgical and other medical services. Accurate forecasts of surgical service capacity are crucial to inform the federal government, training institutions, professional associations, and others charged with improving access to health care. The study uses a dynamic stock and flow model that simulates future changes in numbers and specialty type by factoring in changes in surgeon demographics and policy factors. : Forecasts show that overall surgeon supply will decrease 18% during the period form 2009 to 2028 with declines in all specialties except colorectal, pediatric, neurological surgery, and vascular surgery. Model simulations suggest that none of the proposed changes to increase graduate medical education currently under consideration will be sufficient to offset declines. The length of time it takes to train surgeons, the anticipated decrease in hours worked by surgeons in younger generations, and the potential decreases in graduate medical education funding suggest that there may be an insufficient surgeon workforce to meet population needs. Existing maldistribution patterns are likely to be exacerbated, leading to delayed or lost access to time-sensitive surgical procedures, particularly in rural areas.

  11. Harry Minti- a project for a book

    Science.gov (United States)

    Gaina, Alex

    2011-08-01

    A short biography and an account of scientific research of the Associated Professor of the Hebrew University in Jerusalem (Israel), Dr. Harry Minti (b. 1938, Bucharest) is given. His activity as translator was also mentioned.

  12. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  13. Basic infrastructure for a nuclear power project

    International Nuclear Information System (INIS)

    2006-06-01

    There are several stages in the process of introducing nuclear power in a country. These include development of nuclear policies and regulations, feasibility studies, public consultations, technology evaluation, requests for proposals and evaluations, contracts and financing, supply, construction, commissioning, operation and finally decommissioning. This publication addresses the 'basic' infrastructure needs, which are adequate until the issue of the construction license. It is obvious that a fully developed nuclear infrastructure will be required for the further implementation stages of a nuclear power reactor. The officials and experts in each country will undertake the transition from a basic infrastructure to a fully developed infrastructure that covers the stages of construction, commissioning, operation and decommissioning. The publication is directed to provide guidance for assessing the basic infrastructure necessary for: - A host country to consider when engaging in the implementation of nuclear power, and - A supplier country to consider when assessing whether the recipient country is in an acceptable condition to begin the implementation of a nuclear power project. The target users are decision makers, advisers and senior managers in the governmental organizations, utilities, industrial organizations and regulatory bodies in the countries adopting nuclear power programmes or exporting supplies for these programmes. The governmental organizations that may find this publication useful include: Ministries of Economy, Energy, Foreign Affairs, Finance, Mining, Internal Affairs, Academic Institutions, Nuclear Energy Agencies and Environmental Agencies. This publication was produced within the IAEA programme directed to increase the capability of Member States to plan and implement nuclear power programmes and to establish and enhance national nuclear infrastructure. This publication should be used in conjunction with the IAEA Safety Standards Series and other

  14. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  15. Building a Uranium Heap Leach Project

    International Nuclear Information System (INIS)

    Schnell, Henry

    2014-01-01

    Despite all these we have seen many HL successes and many interesting projects coming down the pipe. • Previous experience in Uranium with previous ROM projects in France (Bessines, Langone), Niger (Somair), Canada (Agnew Lake) and other locations had provided some basic background. • Heap leach based on copper experience with crushed ore has operated for many years in Brazil (Caetite). • Many gold operations for many decades in all climates and continents. • Copper at +20% of production, many in Chile, but also now in many other countries. • Uranium with agglomerated crushed ores is now becoming more prominent – Somair, Imouraren, Trekkopje. • Work also ongoing for Ranger, Rossing, and in consideration for other projects. • Other notable work in Nickel, and multi-metal such as Talvivaara

  16. Development of a major hydroelectric project in the Pacific Rim

    International Nuclear Information System (INIS)

    Afshar, Y.; Kwiatkowski, R.W.

    1990-01-01

    Developing a major international energy project requires the assembly and close coordination of various factors. Some of the specific factors include identification of the client, specific project identification, establishing the need for the project, identifying the pros and cons of the project, technical and financial feasibility of the project, identifying sources of financing, identifying the competitions, studying possible teaming arrangements, involvement of local firms and representatives, and developing a strategy that will lead to the successful negotiation of the contract. This paper briefly addresses each of the factors

  17. Architect Critical Challenges as a Project Manager in Construction Projects: A Case Study

    Directory of Open Access Journals (Sweden)

    Mohammadreza Yadollahi

    2014-01-01

    Full Text Available All construction professionals such as civil, mechanical, and electrical engineers, quantity surveyors, and architects have important roles in the construction process. Among these, architects are frequently appointed as a project manager (PM. The role of a PM will drive the success of the projects implementation. Therefore, the capability of an architect as a PM (ArPM is critical in reducing challenges encountered. Accordingly, the identification of these challenges is an important task in selecting an appropriate ArPM. The aim of this study is to identify the most critical challenges faced by an ArPM for construction projects. The data were collected through questionnaires and interviews with architects and professionals in the Malaysian construction industry. Because of the fuzziness and uncertainty of subjective responses, Fuzzy Set Ttheory is applied to identify critical challenges. A total of 65 questionnaires were distributed and 36 questionnaires were returned. The results revealed that the critical challenges faced by an ArPM are “poor planning,” “unfamiliar technology,” “unfamiliarity with green buildings and materials,” “inappropriate scheduling,” and “poor workmanship.” All critical challenges were then categorized into six main groups including technical, managerial, personal skills, contractual, psychological, and financial.

  18. Expansion program is a challenging project

    International Nuclear Information System (INIS)

    Walker, G.L.

    1992-01-01

    This paper reports that construction is set to begin on the $1.5 billion PGT-PG and E Pipeline Expansion Project. It will consist of 691 miles of 42-in pipeline and 110 miles of 36-in. pipeline, to be built over 2 years. The project, which will transport additional supplies of natural gas to US West Coast markets, has its US regulatory approval in hand. On Oct. 16, 1991, the Federal Energy Regulatory Commission authorized Pacific Gas Transmission Co. to construct its Pacific Northwest segment of the expansion. Pacific Gas and Electric Co. received approval to build its California segment in late 1990 from the California Public Utilities Commission

  19. [How do Prevention Projects Reach their Target Groups? Results of a Survey with Prevention Projects].

    Science.gov (United States)

    Brand, T; Böttcher, S; Jahn, I

    2015-12-01

     The aim of this study was to assess methods used to access target groups in prevention projects funded within the prevention research framework by the German Federal Ministry of Education and Research.  A survey with prevention projects was conducted. Access strategies, communication channels, incentives, programme reach, and successful practical recruitment strategies were explored.  38 out of 60 projects took part in the survey. Most projects accessed their target group within structured settings (e. g., child day-care centers, schools, workplaces). Multiple communication channels and incentives were used, with written information and monetary incentives being used most frequently. Only few projects were able to report their programme reach adequately; programme reach was highest for programmes accessing the target groups in structured settings. The respondents viewed active recruitment via personal communication with the target group and key persons in the settings as the most successful strategy.  The paper provides an overview on recruitment strategies used in current preven-tion projects. More systematic research on programme reach is necessary. © Georg Thieme Verlag KG Stuttgart · New York.

  20. Software-based annunciator replacement: a tale of two projects

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, G.T., E-mail: simmongt@westinghouse.com [Westinghouse Electric Company LLC, Cranberry Township, PA (United States)

    2015-07-01

    Annunciator upgrade projects are often included as parts of operating plant life extension projects as the systems are old and replacement parts are difficult to source. This paper contains case studies of the software-based annunciator replacement projects at the Westinghouse SNUPPS training simulator in Pennsylvania and the Axpo Beznau nuclear power plant in Switzerland. Software-based annunciator systems can offer a number of feature enhancements including improved readability and operator awareness, easy configuration, alarm suppression features, and alarm management at operator workstations. This paper provides an overview of each project and discusses advantages, challenges, and lessons learned from both annunciator-replacement projects. (author)

  1. Software-based annunciator replacement: a tale of two projects

    International Nuclear Information System (INIS)

    Simmons, G.T.

    2015-01-01

    Annunciator upgrade projects are often included as parts of operating plant life extension projects as the systems are old and replacement parts are difficult to source. This paper contains case studies of the software-based annunciator replacement projects at the Westinghouse SNUPPS training simulator in Pennsylvania and the Axpo Beznau nuclear power plant in Switzerland. Software-based annunciator systems can offer a number of feature enhancements including improved readability and operator awareness, easy configuration, alarm suppression features, and alarm management at operator workstations. This paper provides an overview of each project and discusses advantages, challenges, and lessons learned from both annunciator-replacement projects. (author)

  2. Valorization of a repository in an added value project

    International Nuclear Information System (INIS)

    Van Hove, E.

    2004-01-01

    Professor of Sociology (retired), spoke of the valorization of a repository in an added value project. He pointed out that though local stakeholders may lack technical expertise, they consider their personal interests very carefully and projects affecting such interests are taken quite personally. This provides caution but also opportunity for such projects to be conducted in ways that can help, though not guarantee, better acceptance by local stakeholders. Professor Van Hove mentioned three attributes. First, while engineering projects tend to be thought of as mono-functional (e.g. dispose of waste), building flexibility into the project to reflect the interests of the local stakeholders can measurably improve Stakeholder satisfaction. What the implementer may see as a single-purpose project may indeed provide additional, desirable capabilities to a creative local population. Second, while engineering projects, particularly waste management projects are often designed and built in uninteresting, utilitarian ways, a more creative design and implementation can add a sense of enjoyment and pride on the part of the local stakeholders. And third, while engineering projects are often conducted a manner closed to their environment, a more transparent, inclusive process may draw local stakeholders more intimately into the project. All of these features can help by providing inviting borders, by valuing the beauty and aesthetic dimension of the project and by building the project so that it has an appropriate place in the memory of society. Professor Van Hove emphasised that people show great ingenuity in adapting uses and functions beyond those originally intended. The extent to which local stakeholders can help provide the vision and then the reality of such waste management projects can significantly improve their sense of ownership of the project and their ultimate acceptance. (author)

  3. The Millennium Villages Project: a retrospective, observational, endline evaluation.

    Science.gov (United States)

    Mitchell, Shira; Gelman, Andrew; Ross, Rebecca; Chen, Joyce; Bari, Sehrish; Huynh, Uyen Kim; Harris, Matthew W; Sachs, Sonia Ehrlich; Stuart, Elizabeth A; Feller, Avi; Makela, Susanna; Zaslavsky, Alan M; McClellan, Lucy; Ohemeng-Dapaah, Seth; Namakula, Patricia; Palm, Cheryl A; Sachs, Jeffrey D

    2018-05-01

    The Millennium Villages Project (MVP) was a 10 year, multisector, rural development project, initiated in 2005, operating across ten sites in ten sub-Saharan African countries to achieve the Millennium Development Goals (MDGs). In this study, we aimed to estimate the project's impact, target attainment, and on-site spending. In this endline evaluation of the MVP, we retrospectively selected comparison villages that best matched the project villages on possible confounding variables. Cross-sectional survey data on 40 outcomes of interest were collected from both the project and the comparison villages in 2015. Using these data, as well as on-site spending data collected during the project, we estimated project impacts as differences in outcomes between the project and comparison villages; target attainment as differences between project outcomes and prespecified targets; and on-site spending as expenditures reported by communities, donors, governments, and the project. Spending data were not collected in the comparison villages. Averaged across the ten project sites, we found that impact estimates for 30 of 40 outcomes were significant (95% uncertainty intervals [UIs] for these outcomes excluded zero) and favoured the project villages. In particular, substantial effects were seen in agriculture and health, in which some outcomes were roughly one SD better in the project villages than in the comparison villages. The project was estimated to have no significant impact on the consumption-based measures of poverty, but a significant favourable impact on an index of asset ownership. Impacts on nutrition and education outcomes were often inconclusive (95% UIs included zero). Averaging across outcomes within categories, the project had significant favourable impacts on agriculture, nutrition, education, child health, maternal health, HIV and malaria, and water and sanitation. A third of the targets were met in the project sites. Total on-site spending decreased from US$132

  4. The Millennium Villages Project: a retrospective, observational, endline evaluation

    Directory of Open Access Journals (Sweden)

    Shira Mitchell, PhD

    2018-05-01

    Full Text Available Summary: Background: The Millennium Villages Project (MVP was a 10 year, multisector, rural development project, initiated in 2005, operating across ten sites in ten sub-Saharan African countries to achieve the Millennium Development Goals (MDGs. In this study, we aimed to estimate the project's impact, target attainment, and on-site spending. Methods: In this endline evaluation of the MVP, we retrospectively selected comparison villages that best matched the project villages on possible confounding variables. Cross-sectional survey data on 40 outcomes of interest were collected from both the project and the comparison villages in 2015. Using these data, as well as on-site spending data collected during the project, we estimated project impacts as differences in outcomes between the project and comparison villages; target attainment as differences between project outcomes and prespecified targets; and on-site spending as expenditures reported by communities, donors, governments, and the project. Spending data were not collected in the comparison villages. Findings: Averaged across the ten project sites, we found that impact estimates for 30 of 40 outcomes were significant (95% uncertainty intervals [UIs] for these outcomes excluded zero and favoured the project villages. In particular, substantial effects were seen in agriculture and health, in which some outcomes were roughly one SD better in the project villages than in the comparison villages. The project was estimated to have no significant impact on the consumption-based measures of poverty, but a significant favourable impact on an index of asset ownership. Impacts on nutrition and education outcomes were often inconclusive (95% UIs included zero. Averaging across outcomes within categories, the project had significant favourable impacts on agriculture, nutrition, education, child health, maternal health, HIV and malaria, and water and sanitation. A third of the targets were met in the

  5. Feasibility of a joint nuclear project

    International Nuclear Information System (INIS)

    Leung, C.T.

    1980-01-01

    To meet the growing power demand in the late eighties, the People's Republic of China will cooperate with Hong Kong to develop nuclear power. In this paper, the energy policy of China and her nuclear capabilities are reviewed, and some of the foreseeable problems of the China and Hong Kong joint nuclear project are discussed. (author)

  6. Usability: A Teaching and School Service Project

    Science.gov (United States)

    Snyder, Johnny

    2009-01-01

    Your next usability project could be waiting for you in the college library, registration office, or online admissions process that your college or university utilizes in their daily transactions. As an added bonus, these exercises supplement the IS2002 curriculum model, benefit the instructor's institution, build inter-departmental collaboration,…

  7. A critical view on singular therapeutic projects

    Directory of Open Access Journals (Sweden)

    Fernando Sfair Kinker

    2016-04-01

    Full Text Available This article discusses the issue of unique therapeutic projects within the mental health services built in the Brazilian psychiatric reform process. Starting from the concepts that have gained strength in both the psychiatric reform as in the collective health, this study proposes that current notions of the therapeutic project still are influenced by biological, psychological or social paradigms that simplify the complexity of the experience suffered by the subjects. Despite therapeutic projects are an essential achievement for the qualification of mental health care, it is still necessary to produce an epistemological rupture in the relationship with mental suffering so that they can achieve the greatest potential for transformation. Therefore, the article suggests that the practice of therapeutic projects should hold discussions with the reality of users life of and their relationships in the territories of existence, to transform the relations of power and knowledge that reproduce the subjects annulment. Thus, it is possible to dialogue with the complexity of the mental suffering experience, producing changes in the scenes that produce it.

  8. A projective approach to a language of landscape design

    Directory of Open Access Journals (Sweden)

    Catherine Ward Thompson

    1997-10-01

    Full Text Available Building on the work of Kelly (1955 in personal construct psychology, and Peled (1976, I990 in ecoanalysis, this paper develops projective techniques-which use concepts of personal and phenomenological space-as a means for articulating approaches to landscape design. The projective approach involves two stages. In stage one, projective techniques are used to elicit personal constructs (which may be held at a pre-conscious or sub-conscious level, allowing the holistic experience of landscape to be explored. In stage two, using a 'projection location task' derived from the way we experience and construe the regions of our own bodies, elements of these constructs can then be articulated so as to inform the way we interact and engage with the space around us. This gives insight into the meaning of spatial layouts, which can then be translated into a design language for the structural ordering of space. The author draws on original research conducted with children as well as adults, using projective techniques to draw out their desires and needs in relation to designing their landscape environment. The paper discusses the value of such methods for landscape designers and their clients, and outlines some ongoing research to test the validity of the projection location task.

  9. Lunar scout: A Project Artemis proposal

    Science.gov (United States)

    The results of a student project to design a lunar lander in the context of a specifically defined mission are presented. The Lunar Scout will be launched from Cape Canaveral, Florida onboard a Delta II launch vehicle. The Delta II will carry the lander and its payload to a 1367 km orbit. Once it reaches that altitude, a STAR 48A solid rocket motor will kick the spacecraft into a lunar trajectory. After burnout of the lunar insertion motor, it will be jettisoned from the spacecraft. The flight from the earth to the moon will take approximately 106.4 hours. During this time the battery, which was fully charged prior to launch, will provide all power to the spacecraft. Every hour, the spacecraft will use its sun sensors and star trackers to update its position, maintain some stabilization and relay it back to earth using the dipole antennas. At the start of its lunar trajectory, the spacecraft will fire one of its 1.5 N thrusters to spin in at a very small rate. The main reason for this is to prevent one side of the spacecraft from overheating in the sun. When the spacecraft nears the moon, it will orient itself for the main retro burn. At an altitude of 200 km, a 4400 N bipropellant liquid thruster will ignite to slow the spacecraft. During the burn, the radar altimeter will be turned on to guide the spacecraft. The main retro rocket will slow the lander to 10 m/s at an approximate altitude of 40 km above the moon. From there, the space craft will use four 4.5 N hydrazine vertical thrusters and 1.5 N horizontal thrusters to guide the spacecraft to a soft landing. Once on the ground, the lander will shutoff the radar and attitude control systems. After the debris from the impact has settled, the six solar panels will be deployed to begin recharging the batteries and to power up the payload. The feedhorn antenna will then rotate to fix itself on the earth.

  10. Development and implementation of a residency project advisory board.

    Science.gov (United States)

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  11. A Coastal Citizen Science Project - How to run an international Citizen Science Project?

    Science.gov (United States)

    Kruse, K.; Knickmeier, K.; Thiel, M.; Gatta, M.

    2016-02-01

    "Searching for plastic garbage" is an international Citizen Science project that aims to participate school students in the public discussion on the topic "plastic pollution in the ocean". For this, young people apply various research methods, evaluate their data, communicate and publish their results and investigate solutions solving this problem. The project will be carried out in Chile and Germany at the same time, which allows the participating students to share and compare their results and discuss their ideas with an international partner. This takes place on the website www.save-ocean.org. The project promotes intercultural and scientific skills of the students. They get insights into scientific research, get into another culture and experiences plastic pollution as an important global problem. Since May 2015, 450 pupils aged 10 to 15 years and 20 teachers in Germany and Chile have explored the plastic garbage on beaches. Where are the largest plastic garbage deposits? Which items of plastic are mostly found in Germany and Chile? Or where does this garbage comes from? These and other research questions are being answered by an international network between students, teachers and scientists. After completing the first Citizen Science pilot study successfully in summer 2015, the entire German and Chilean coast will be explored in spring 2016 by around 2500 participating school students. The project "Searching for plastic garbage" is the first international Citizen Science project that is a cooperation between the ocean:lab of Kiel Science Factory and the "Cientificos de la Basura", a project of the department of marine biology at University Catolica del Norte in Coquimbo, Chile. The project is supported by the Cluster of Excellence "The Future Ocean", the Leibniz Institute for Science Education and Mathematics (IPN), the Ministry of School and Professional Education of Land Schleswig-Holstein and the University Catolica del Norte in Coquimbo, Chile

  12. Key aspects to perform a project on energy management

    International Nuclear Information System (INIS)

    Bachini, R.

    1993-01-01

    A general overview on elements and organisms playing a key role to launch a new industrial project is given, taking as base case an energy management project. Likewise the problematic of training personnel involved in the project is analyzed. Energy management becomes crucial in industries where energy costs represent a big portion of the whole production cost. Main aspects to be analyzed are: - Adequate production procedures to be competitive - Environment protection regarding waste management - Maximization of safety at production installations. (Author)

  13. A prospective radiological risk assessment for a phosphate industry project

    Energy Technology Data Exchange (ETDEWEB)

    Lauria, Dejanira C.; Reis, Rocio G., E-mail: dejanira@ird.gov.br, E-mail: rocio@ird.gov.br

    2012-07-01

    The Santa Quiteria Project is the major Brazilian uranium mine project, nowadays. A peculiarity of this project is the association of uranium with phosphate and the mining and processing of both by two different enterprises. A private company will be responsible for the production of phosphoric acid and a state owned company will be responsible for the production of yellow cake. At full capacity, the facility will generate 10% of Brazil's total annual phosphoric acid production and 1,500 tons of yellow cake per year. The processing by which phosphoric acid is produced generates phosphogypsum (PG) as a by-product. The ratio of phosphogypsum to phosphoric acid is around 5 to 1. After all the phosphate has been extracted and processed, it is expected that some 37 million tons of phosphogypsum with 13 Bq/g of {sup 226}Ra will be produced. A prospective generic assessment was carried out for evaluating the potential radioactive impact of this PG stack on the workers and surrounding inhabitants. Two hypothetical farmer scenarios were designed to estimate the potential dose out of the project boundary and over the stack piles, after the shutdown of the project. The annual exposure dose of workers was also evaluated. As a result, the potential public and worker doses exceeded the adopted level of doses of 1mSv.y{sup -1} and 6 mSv.y{sup -1}, respectively. The simulation spotlighted the importance of the rainfall erosion index, and consequently the stack shape for the environmental contamination. The importance of planning the decommissioning of the facility still in the planning phase of the project to give support for the feasibility studies was also highlighter. Although quite conservative, the prospective assessing of dose herein is useful to aware and guide the decision makers on information and data survey and taking avoiding action to protect the health, by changing the project in some way. (author)

  14. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-26

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects.

  15. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Ageeli

    2016-03-01

    Full Text Available The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twelve critical success factors, the most important factors of it were ("contractor financial efficiency ", " security ,political , economic stability ", "the project manager competence" and " Integration and clarity of contract documents " , thirteen critical failure factors, the most important factors of it were ("corruption " , " external circumstances ", "Financial difficulties of owner", and ten success criteria , the most important criteria of it were ("within allocated budget" , " within time period" , "Quality" .

  16. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects

  17. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  18. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  19. City of Austin: Green habitat learning project. A green builder model home project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The purpose of the Year 14 UCETF project was to design and construct a residential structure that could serve as a demonstration facility, training site, and testing and monitoring laboratory for issues related to the implementation of sustainable building practices and materials. The Model Home Project builds on the previous and existing efforts, partially funded by the UCETF, of the City of Austin Green Builder Program to incorporate sustainable building practices into mainstream building activities. The Green Builder Program uses the term {open_quotes}green{close_quotes} as a synonym for sustainability. In the research and analysis that was completed for our earlier reports in Years 12 and 13, we characterized specific elements that we associate with sustainability and, thus, green building. In general, we refer to a modified life cycle assessment to ascertain if {open_quotes}green{close_quotes} building options reflect similar positive cyclical patterns found in nature (i.e. recyclability, recycled content, renewable resources, etc.). We additionally consider economic, human health and synergistic ecological impacts associated with our building choices and characterize the best choices as {open_quotes}green.{close_quotes} Our ultimate goal is to identify and use those {open_quotes}green{close_quotes} materials and processes that provide well for us now and do not compromise similar benefits for future generations. The original partnership developed for this project shifted during the year from a project stressing advanced (many prototypical) {open_quotes}green{close_quotes} building materials and techniques in a research and demonstration context, to off-the-shelf but underutilized {open_quotes}green{close_quotes} materials in the practical social context of using {open_quotes}green{close_quotes} technologies for low income housing. That project, discussed in this report, is called the Green Habitat Learning Project.

  20. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  1. The life cycle of a genome project: perspectives and guidelines inspired by insect genome projects.

    Science.gov (United States)

    Papanicolaou, Alexie

    2016-01-01

    Many research programs on non-model species biology have been empowered by genomics. In turn, genomics is underpinned by a reference sequence and ancillary information created by so-called "genome projects". The most reliable genome projects are the ones created as part of an active research program and designed to address specific questions but their life extends past publication. In this opinion paper I outline four key insights that have facilitated maintaining genomic communities: the key role of computational capability, the iterative process of building genomic resources, the value of community participation and the importance of manual curation. Taken together, these ideas can and do ensure the longevity of genome projects and the growing non-model species community can use them to focus a discussion with regards to its future genomic infrastructure.

  2. The ATLAS project: The effects of a constructionist digital laboratory project on undergraduate laboratory performance.

    Science.gov (United States)

    Shoepe, Todd C; Cavedon, Dana K; Derian, Joseph M; Levy, Celine S; Morales, Amy

    2015-01-01

    Anatomical education is a dynamic field where developments in the implementation of constructive, situated-learning show promise in improving student achievement. The purpose of this study was to examine the effectiveness of an individualized, technology heavy project in promoting student performance in a combined anatomy and physiology laboratory course. Mixed-methods research was used to compare two cohorts of anatomy laboratories separated by the adoption of a new laboratory atlas project, which were defined as preceding (PRE) and following the adoption of the Anatomical Teaching and Learning Assessment Study (ATLAS; POST). The ATLAS project required the creation of a student-generated, photographic atlas via acquisition of specimen images taken with tablet technology and digital microscope cameras throughout the semester. Images were transferred to laptops, digitally labeled and photo edited weekly, and compiled into a digital book using Internet publishing freeware for final project submission. An analysis of covariance confirmed that student final examination scores were improved (P project (PRE, n = 75; POST, n = 90; means ± SE; 74.9 ± 0.9 versus 78.1 ± 0.8, respectively) after controlling for cumulative student grade point average. Analysis of questionnaires collected (n = 68) from the post group suggested students identified with atlas objectives, appreciated the comprehensive value in final examination preparation, and the constructionism involved, but recommended alterations in assignment logistics and the format of the final version. Constructionist, comprehensive term-projects utilizing student-preferred technologies could be used to improve performance toward student learning outcomes. © 2014 American Association of Anatomists.

  3. THE QUALITY IMPORTANCE IN A PROJECT MANAGEMENT COMPLEXITY ENVIRONMENT

    OpenAIRE

    Adrian UNGUREANU; Anca VARGA

    2009-01-01

    A project is a temporary endeaver undertaken to creat a unique product, service or result. The temporary nature of project indicates a definite beginning and end. The end is reached when the project’s objectives have been achieved or when the project is terminated becouse its objectives will not or cannot be met, when the need for the project no longer exist. Temporary does not necessarily mean short in duration. Temporary does not generally apply to the product, service, or result created by...

  4. Financing considerations for international coalbed methane projects - a case history

    International Nuclear Information System (INIS)

    Mize, J.S.

    1990-01-01

    This presentation on financing of international, coalbed methane fueled Cogen projects is intended to provide the reader with some insight into the key steps and issues involved in financing an outside-the-USA project. No claim is made as to whether the strategy employed for the China projects will be suitable for other projects. The presentation is made from the perspective of an entrepreneur seeking a workable financial structure to address the concerns of risk, return, technology transfer to a third world country, and stage-wise development from prefeasibility assessment through complete resource development and gas utilization. The China projects referred to in this paper are not yet fully financed. Final project approvals for financing awaiting a request by the USA group for China to confirm that their 50% funding is available, and that initial funds have been transferred to the USA group's bank account

  5. Incentive Structure of Financing a Project: An Islamic Finance Approach

    OpenAIRE

    Lone, Fayaz Ahmad; Quadir, Abdul

    2017-01-01

    Financing is an important component in any project. Without finance, it is impossible to run any project as it is considered the lifeblood of the business. But due to the presence of predetermined rate of interest, economists have provided alternative approach for financing the project. In this paper a model using Profit and Loss Sharing (PLS) system and comparison of it with the conventional financing model is developed. Thrust in this paper is towards establishing a new theoretical reasonin...

  6. Marketing mix - project of a textbook for business academies

    OpenAIRE

    Zatloukalová, Zuzana

    2010-01-01

    The thesis deals with project of a textbook for business academies. The theme of the chapter of the textbook is marketing mix. The project is made in such a way the students get total information on these problems. The extant of the theme is intended for students of higher classes. The project consists of theoretical part (textbook, exercise book) and practical part (teaching at business academy).

  7. A new major SETI project based on Project SERENDIP data and 100,000 personal computers

    Science.gov (United States)

    Sullivan, Woodruff T., III; Werthimer, Dan; Bowyer, Stuart; Cobb, Jeff; Gedye, David; Anderson, David

    1997-01-01

    We are now developing an innovative SETI project involving massively parallel computation on desktop computers scattered around the world. The public will be uniquely involved in a real scientific project. Individuals will download a screensaver program that will not only provide the usual attractive graphics when their computer is idle, but will also perform sophisticated analysis of SETI data using the host computer. The data are tapped off Project SERENDIP IV's receiver and SETI survey operating on the 305-m-diameter Arecibo radio telescope. We make a continuous tape-recording of a 2-MHz bandwidth signal centered on the 21-cm H I line. The data on these tapes are then preliminarily screened and parceled out by a server that supplies small chunks of data over the Internet to clients possessing the screen-saver software. After the client computer has automatically analyzed a complete chunk of data a report on the best candidate signals is sent back to the server, whereupon a new chunk of data is sent out. If 50,000-100,000 customers can be achieved, the computing power will be equivalent to a substantial fraction of atypical supercomputer, and the project will cover a volume of parameter space comparable to that of SERENDIP IV.

  8. A Survey of Technologies Supporting Virtual Project Based Learning

    DEFF Research Database (Denmark)

    Dirckinck-Holmfeld, Lone

    2002-01-01

    This paper describes a survey of technologies and to what extent they support virtual project based learning. The paper argues that a survey of learning technologies should be related to concrete learning tasks and processes. Problem oriented project pedagogy (POPP) is discussed, and a framework...... for evaluation is proposed where negotiation of meaning, coordination and resource management are identified as the key concepts in virtual project based learning. Three e-learning systems are selected for the survey, Virtual-U, Lotus Learningspace and Lotus Quickplace, as each system offers different strategies...... for e-learning. The paper concludes that virtual project based learning may benefit from facilities of all these systems....

  9. LEADERSHIP AS A FACTOR FOR BUILDING A PROJECT TEAM

    Directory of Open Access Journals (Sweden)

    Marina Grynchenko

    2018-03-01

    Full Text Available The subject matter of the article is to determine the role of leadership for building a project team as the team quality and the professionalism of the team participants play a key role in ensuring the proper work performance that is specified by the tasks of the project. The goal of the article is to reveal the significance of the capability of a leader to build a project team and to develop in it a favorable psychological climate, common values and ideals and show the place of this capability in the general system of the leader’s behavioural competences, that is to justify the importance of this skill and its application to increase the effectiveness of the impact of leadership on the project team. The objectives of the study involve  - identifying a project team as a complex social organism where highly qualified people perform a specific set of functions; - emphasizing the fact that different individual features and qualities of participants greatly complicate the process of building a project team as well as  coordinating the goals, aspirations and interests of team participants. Besides, the students who study Project Management should be familiarized with the methods of acquiring the knowledge and developing skills necessary for building a team. The methods of the study involve the analysis of the role of motivation in the process of team building since while building a team the leader has to solve many problems and the issues of motivation are among them. Second, the character of relations among the participants and the rational organization of their efficient teamwork should be analyzed. Third, the analysis of the leader’s capability to foster the professional and personal development of the participants in the teamwork is of great importance. Fourth, the effective method of cultivating in leaders the skills of building a team is increasing the level of teaching behavioural competences using innovative pedagogical techniques

  10. Using Project Portfolio Management in a Junior Enterprise Technology

    Directory of Open Access Journals (Sweden)

    RIBEIRO, D. M.

    2011-06-01

    Full Text Available Junior Enterprises have their own particularities in managing of their projects. Scarcity of resources and lack of experience of its members are critics and typical factors in the daily life of these companies. However, these and other variables such as the time for return on investment, project complexity and runtime of the project, must be taken into consideration in the prioritization of the outstanding portfolio projects to maximize desired outcomes. The Portfolio Management aims to provide the company a better allocation of resources in an environment with multiple projects going simultaneously. The model proposed here seeks a link between projects and organizational strategy. In this Paper also are presented the results of applying the model on Upe consultoria JR.

  11. The role of project manager in benefits realization management as a project constraint/driver

    Directory of Open Access Journals (Sweden)

    Amr Mossalam

    2016-12-01

    In summary, the results of this paper can be used to: enlarging the project manager responsibilities to acquire the benefits realization, giving a high level 6-step process for benefits management, suggesting a mechanism for managing these benefits through benefits register, benefits realization plan, measures and KPIs and closure business case.

  12. The Medieval Dublin Project: A Case Study

    Directory of Open Access Journals (Sweden)

    Niall O'hOisin

    2010-04-01

    Full Text Available This paper provides an overview of the Medieval Dublin Project. It covers the development and release of the DVD ‘Medieval Dublin: From Vikings to Tudors (Schools Edition,’ and outlines the major virtual and interactive features developed for that release. The paper also covers the collaboration that took place between the DVD development team and the academic community and discusses the ways in which 3D visualisations, timelines, interactivity and character-based storytelling were used to present Dublin’s archaeological heritage in an engaging and interesting way

  13. The MAJORANA Project: a status report

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, Steven Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-06-09

    This series of slides presents the topic under the following aspects: ββ sensitivity, underground laboratory, shield, monoliths, strings, detectors, electroformed small parts, and background. Assembly and construction are proceeding at Sanford Davis Campus laboratory. Based on assays, material backgrounds are projected to meet cleanliness goals. Module 1 is complete. Electroformed copper has just been completed at SURF and PNNL. The shield is nearly complete. Successful reduction and refinement of enrGe has taken place with 98% yield. AMTEK (ORTEC) has produced 27 kg within 32 detectors from the reduced/refined enrGe; 30 of these are underground at SURF being assembled into strings.

  14. Technology Uncertainty and Project Managers' Information Sharing - A comparative case study of two new product development projects

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Dietrich, Perttu

    2014-01-01

    uncertainty during various phases of new product development (NPD) projects. In this study, we compare two longitudinal NPD sub-projects that differ in uncertainty within the same large NPD project, in which the data source is the complete email exchange between a project manager and various actors...... (consisting of 3979 emails). The results show high levels of information sharing with the customer in both the early and late phases of high uncertainty. Interestingly, in the low uncertainty project, information sharing with the production department and the supplier is higher during the late phase...... of the NPD project. Unexpectedly, in both sub-projects, the project manager shares information with a wider range of both intra- and inter-organization actors in the early phases of the projects than in the late phases....

  15. Diversity in research projects - A key to success?

    Science.gov (United States)

    Henkel, Daniela; Eisenhauer, Anton; Taubner, Isabelle

    2017-04-01

    According to demographers, psychologists, sociologists and economists diverse groups, which are groups of different race, ethnicity, gender and sexual orientation, are more innovative than homogeneous groups. This is also true for groups working together in research collaborations and international cooperation involving a culturally and functionally diverse mix of individuals who have to be integrated into an effective unit - a project team. If the goal is scientific excellence, diversity should be an essential ingredient to conduct science on high level productivity, quality and innovation. Effective teamwork is a key to project success and prime responsibilities of the project manager. Therefore, the project manager has to take into consideration different characteristics such as cultures, languages, and different values related to individual project partners. Here we show how diversity can affect the performance of a research project. Furthermore, the presentation indicates skills and abilities which are required for the management in order to deal also with the challenges of diversity in research projects. The presentation is based on insights experienced in the context of an Innovative Training Network (ITN) project within Marie Skłodowska-Curie Actions of the European HORIZON 2020 program and TRION a Collaborative Research Project in the Framework of the Trilateral Program of the German Research Foundation.

  16. A Systematic Approach to Modelling Change Processes in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available Modelling change processes within construction projects isessential to implement changes efficiently. Incomplete informationon the project variables at the early stages of projects leads toinadequate knowledge of future states and imprecision arisingfrom ambiguity in project parameters. This lack of knowledge isconsidered among the main source of changes in construction.Change identification and evaluation, in addition to predictingits impacts on project parameters, can help in minimising thedisruptive effects of changes. This paper presents a systematicapproach to modelling change process within construction projectsthat helps improve change identification and evaluation. Theapproach represents the key decisions required to implementchanges. The requirements of an effective change processare presented first. The variables defined for efficient changeassessment and diagnosis are then presented. Assessmentof construction changes requires an analysis for the projectcharacteristics that lead to change and also analysis of therelationship between the change causes and effects. The paperconcludes that, at the early stages of a project, projects with a highlikelihood of change occurrence should have a control mechanismover the project characteristics that have high influence on theproject. It also concludes, for the relationship between changecauses and effects, the multiple causes of change should bemodelled in a way to enable evaluating the change effects moreaccurately. The proposed approach is the framework for tacklingsuch conclusions and can be used for evaluating change casesdepending on the available information at the early stages ofconstruction projects.

  17. A Guide to Bundling Small-scale CDM Projects

    International Nuclear Information System (INIS)

    Mariyappan, J.; Bhardwaj, N.; De Coninck, H.; Van der Linden, N.

    2005-07-01

    Small-scale renewable energy and energy efficiency projects that fit the development needs of many developing countries, can potentially be supported via the Clean Development Mechanism (CDM), one of the Kyoto Protocol's flexible mechanisms for tackling climate change. However, there is concern that due to high transaction costs, as well as many existing barriers, very few investments will be made in small-scale projects, which are often the most suitable development option in countries such as India. In view of this, the 'bundling' together of appropriate small-scale projects on a regional basis has been proposed as a way in which funding can be leveraged from international sources and transaction costs reduced. IT Power, IT Power India and the Energy research Centre of the Netherlands (ECN) are carrying out a 2-year project to establish the capacity within India to enable individual small scale projects to be bundled as a single CDM project. Overall objectives are to develop the necessary institutional capabilities to formulate and implement small scale CDM projects in India; to provide a guide on how to bundle small scale projects under the CDM in developing countries; and to raise the awareness of the potential for investment in small scale energy projects which can gain funding through the CDM

  18. Computing the maximum volume inscribed ellipsoid of a polytopic projection

    NARCIS (Netherlands)

    Zhen, Jianzhe; den Hertog, Dick

    We introduce a novel scheme based on a blending of Fourier-Motzkin elimination (FME) and adjustable robust optimization techniques to compute the maximum volume inscribed ellipsoid (MVE) in a polytopic projection. It is well-known that deriving an explicit description of a projected polytope is

  19. Computing the Maximum Volume Inscribed Ellipsoid of a Polytopic Projection

    NARCIS (Netherlands)

    Zhen, J.; den Hertog, D.

    2015-01-01

    We introduce a novel scheme based on a blending of Fourier-Motzkin elimination (FME) and adjustable robust optimization techniques to compute the maximum volume inscribed ellipsoid (MVE) in a polytopic projection. It is well-known that deriving an explicit description of a projected polytope is

  20. The Fernald wet records recovery project: A case history

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, H.J.; Devir, B.R.; Hawley, R.A. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Freesmeyer, M.T. [USDOE Ohio Field Office (United States)

    1995-06-22

    This paper discusses a project performed to recover wet records discovered in January 1995 at the Fernald Environmental Management Project (FEMP). This paper discusses the emergency and record recovery phases of the project, the technical options considered for records recovery, and special measures which were required due to radiological contamination of the records. Also, the root causes and lessons learned from the incident, and path forward for future records management operations at Fernald, are discussed.

  1. Managing IT Projects in Public Companies: A Case Study

    Directory of Open Access Journals (Sweden)

    Bouras, A.

    2014-07-01

    Full Text Available As part of its public sector modernization effort, a North African government has put a lot of effort and allocated significant budgets since 1997 to modernize one of its main public sector companies. Consequently, this company, that mainly offers postal services, initiated many IT-based projects to computerize all paper-based ongoing services offered through its branches and to present new products to customers. This company was aiming to improve service quality and to diversify the range of its services. However, some of these IT-based projects inevitably faced problems. Some projects were either not completed successfully, cancelled, over-budget or taking more time than scheduled. As a result, many employees and customers of this company were dissatisfied and complained about bad planning, slowness and significant disruptions in these projects, an event that affected adversely the quality of service. This study aims at determining the causes of these project disruptions, failures or delays. To achieve this aim, 30 experienced project developers and engineers working in that company’s IT department volunteered to respond to a detailed questionnaire specifically developed for this purpose. The questionnaire included questions about project vision clarity, time/cost management, project quality assurance, risk management and human resources management. Results show that the main reasons for disruptions, failure or delays in IT projects are lack of business plan and poor documentation during and after finishing projects, lack of clear quality assurance criteria, standards and reviews, and poor project risk management practices. Ramifications of such results in terms of improving IT project management practices in the public service sector are finally presented.

  2. The Fernald wet records recovery project: A case history

    International Nuclear Information System (INIS)

    Sterling, H.J.; Devir, B.R.; Hawley, R.A.; Freesmeyer, M.T.

    1995-01-01

    This paper discusses a project performed to recover wet records discovered in January 1995 at the Fernald Environmental Management Project (FEMP). This paper discusses the emergency and record recovery phases of the project, the technical options considered for records recovery, and special measures which were required due to radiological contamination of the records. Also, the root causes and lessons learned from the incident, and path forward for future records management operations at Fernald, are discussed

  3. Evolution of project planning tools in a matrix organization

    Energy Technology Data Exchange (ETDEWEB)

    Furaus, J.P.; Figueroa-McInteer, C.; McKeever, P.S.; Wisler, D.B. [Sandia National Labs., Albuquerque, NM (United States); Zavadil, J.T. [Infomatrix (United States)

    1996-10-01

    Until recently, the Corporate Construction Program at Sandia was experiencing difficulties in managing projects: poor planning and cost estimating caused schedule and budget problems. The first step taken was a Microsoft {reg_sign} Project schedule that provides a standard template for scheduling individual construction projects. It is broken down according to the life cycle of the project and prevents the project team from leaving out an important item. A WBS (work breakdown structure) dictionary was also developed that describes how capital and operating funds are used to develop, design, construct, equip, and manage projects. We also developed a matrix chart that maps the planning guide against the major types of construction projects at Sandia. The guide, dictionary, and matrix chart offer enough flexibility that the project manager can make choices about how to structure work, yet ensure that all work rolls up to the cost categories and key DOE WBS elements. As requirements change, the tools can be updated; they also serve as training tools for new project team members.

  4. THE FORMATION OF A CAPITAL INVESTMENT PROJECT INDUSTRIAL ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Y. S. Potashnik

    2015-01-01

    Full Text Available The article specifies the main sources of financing of investment projects of industrial enterprises, among which are proposed to distinguish between belonging to the participants (shareholders of the company and others. Shows the sequence and content of the steps in building the industrial enterprises of a specific capital investment project. The main requirements for the capital structure of the investment project. As such invited to consider the requirements for the financial feasibility of the project, minimize the cost of capital of the project, the need for additional investments and changes of property shares members of the company, and not exceeding the maximum level of the probability of occurrence of insolvency of the enterprise. The approach allowing to assess the adequacy of the probability of occurrence of insolvency of the enterprise in one way or another the capital structure of the project the maximum allowable (limit level. The methodical examples of basic calculations.

  5. Phase II Final Project Report SBIR Project: "A High Efficiency PV to Hydrogen Energy System"

    Energy Technology Data Exchange (ETDEWEB)

    Slade, A; Turner, J; Stone, K; McConnell, R

    2008-09-02

    The innovative research conducted for this project contributed greatly to the understanding of generating low-cost hydrogen from solar energy. The project’s research identified two highly leveraging and complementary pathways. The first pathway is to dramatically increase the efficiency of converting sunlight into electricity. Improving solar electric conversion efficiency directly increases hydrogen production. This project produced a world record efficiency for silicon solar cells and contributed to another world record efficiency for a solar concentrator module using multijunction solar cells. The project’s literature review identified a second pathway in which wasted heat from the solar concentration process augments the electrolysis process generating hydrogen. One way to do this is to use a “heat mirror” that reflects the heat-producing infrared and transmits the visible spectrum to the solar cells; this also increases solar cell conversion efficiency. An economic analysis of this concept confirms that, if long-term concentrator photovoltaic (CPV) and solid-oxide electrolyzer cost goals can be achieved, hydrogen will be produced from solar energy cheaper than the cost of gasoline. The potential public benefits from this project are significant. The project has identified a potential energy source for the nation’s future electricity and transportation needs that is entirely “home grown” and carbon free. As CPV enter the nation’s utility markets, the opportunity for this approach to be successful is greatly increased. Amonix strongly recommends further exploration of this project’s findings.

  6. First-of-A-Kind Control Room Modernization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-02-01

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

  7. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million

  8. On the Sense of Ownership of a Community Integration Project ...

    African Journals Online (AJOL)

    On the Sense of Ownership of a Community Integration Project: Phenomenology as Praxis in the Transfer of Project Ownership from Third-Party Facilitators to a Community after Conflict Resolution. ... Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader.

  9. The Woodworker's Website: A Project Management Case Study

    Science.gov (United States)

    Jance, Marsha

    2014-01-01

    A case study that focuses on building a website for a woodworking business is discussed. Project management and linear programming techniques can be used to determine the time required to complete the website project discussed in the case. This case can be assigned to students in an undergraduate or graduate decision modeling or management science…

  10. Project Circuits in a Basic Electric Circuits Course

    Science.gov (United States)

    Becker, James P.; Plumb, Carolyn; Revia, Richard A.

    2014-01-01

    The use of project circuits (a photoplethysmograph circuit and a simple audio amplifier), introduced in a sophomore-level electric circuits course utilizing active learning and inquiry-based methods, is described. The development of the project circuits was initiated to promote enhanced engagement and deeper understanding of course content among…

  11. Using Pamphlets to Teach Biochemistry: A Service-Learning Project

    Science.gov (United States)

    Harrison, Melinda A.; Dunbar, David; Lopatto, David

    2013-01-01

    A service-learning project appropriate for a biochemistry or advanced biochemistry course was designed and implemented. The project involved students partnering with a homeless shelter to design informational pamphlets to be displayed at the shelter for the clients' use. The pamphlet topics were based on diseases studied within the course.…

  12. A Project-based Learning approach for teaching Robotics to ...

    African Journals Online (AJOL)

    In this research we used a project-based learning approach to teach robotics basics to undergraduate business computing students. The course coverage includes basic electronics, robot construction and programming using arduino. Students developed and tested a robot prototype. The project was evaluated using a ...

  13. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  14. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  15. Projective Test Use among School Psychologists: A Survey and Critique

    Science.gov (United States)

    Hojnoski, Robin L.; Morrison, Rhonda; Brown, Melissa; Matthews, William J.

    2006-01-01

    The use of projective techniques by school psychologists has been a point of interest and debate, with a number of survey studies documenting usage. The purpose of this study is to update the status of projective use among school psychologists, with a specific focus on their use in the social emotional assessment of children in schools. In…

  16. A note on root projection and labelling | Zeller | Stellenbosch Papers ...

    African Journals Online (AJOL)

    This paper identifies a problem with a hypothesis put forward in Chomsky (2013) in relation to his labelling algorithm. Chomsky suggests that category-neutral roots do not qualify as labels and cannot project. However, I provide evidence that the derivation of particle verbs involves the projection of a category-neutral root, ...

  17. Rescue the problem project: a complete guide to identifying, preventing, and recovering from project failure

    National Research Council Canada - National Science Library

    Williams, Todd C

    2011-01-01

    ... vii American Management Association www.amanet.orgviii Contents Creating the Assignment's Statement of Work Defining the Responsibilities by Phase in the SOW Establishing the Recovery Manager's Authority Accepting the Role as a Recovery Manager Creating an Outline of the Recovery Chapter Takeaway 24 25 28 28 29 30 PART II Auditing the Project: Unde...

  18. Applying Project Management Strategies in a Large Curriculum Conversion Project in Higher Education

    Science.gov (United States)

    Gardner, Joel; Bennett, Patrick A.; Hyatt, Niccole; Stoker, Kevin

    2017-01-01

    Higher education is undergoing great changes that require universities to adapt quickly, and making these changes can be difficult. One discipline that can aid in executing change is project management, which has developed a set of clear processes and strategies for completing initiatives quickly and effectively. Several authors have identified…

  19. "XANSONS for COD": a new small BOINC project in crystallography

    Science.gov (United States)

    Neverov, Vladislav S.; Khrapov, Nikolay P.

    2018-04-01

    "XANSONS for COD" (http://xansons4cod.com) is a new BOINC project aimed at creating the open-access database of simulated x-ray and neutron powder diffraction patterns for nanocrystalline phase of materials from the collection of the Crystallography Open Database (COD). The project uses original open-source software XaNSoNS to simulate diffraction patterns on CPU and GPU. This paper describes the scientific problem this project solves, the project's internal structure, its operation principles and organization of the final database.

  20. A real CDIO mechanical engineering project in 4th semester

    DEFF Research Database (Denmark)

    Lauritsen, Aage Birkkjær

    In the past 6 years at the mechanical engineering study at the Engineering College of Aarhus we have been practicing project work on 4th Semester in the design of energy technology systems. In my presentation, I will give a description of the project, and the thoughts behind; pedagogic......-6 students, and will partly support the general theory being taught in the courses, but will also provide students with skills in teamwork, project work and system building. The pedagogical considerations behind the development of the project are quite simply that students learn best through active work...

  1. A review of the possible future HEP Accelerator Projects

    CERN Multimedia

    CERN. Geneva

    2010-01-01

    The review, as already invited for presentation at the recent International Conference on High Energy Physics (ICHEP2010), covers all accelerator projects presently envisaged for HEP in the near and mid-term future. After a brief description of the major motivation, issues and necessary R&D of each project, it specially emphasizes the synergies between the different projects and their R&D issues, pointing out their complementarities and the efficient collaborative approach to address them. It finally summarizes the relative schedule of the various projects in their different phases, pointing out their global interdependence.

  2. Sunray project - A long-term, nationwide educational process

    International Nuclear Information System (INIS)

    Nikula, Anneli

    2000-01-01

    The Sunray project is a nationwide educational process coordinated by the Economic Information Bureau (TaT Group) for ninth graders in Finnish comprehensive schools. The project aims at giving thorough and versatile information on radiation within the framework of various subjects (physics, biology, domestic science, history, European languages, mother tongue, health education etc.). The Sunray project covers all ninth graders of the existing 600 Finnish comprehensive schools; in all involving some 65 000 pupils. The project, which has been repeated five times, was initiated as part of the European Science and Technology week in 1995. During the first two years it was strongly linked with the science week as natural sciences were seen as a good framework for the chosen perspective. Since 1997, the project has been run as an event in its own right. The project has applied the method of processing integrated groups of themes, which is an objective of the comprehensive school system and the experimental method of science. As schools make their own decisions about the educational programmes to be adopted every semester, the project has been marketed to schools at the beginning of May. The TaT Group has arranged marketing events in some 10 localities in Finland. The Economic Information Bureau of Finland coordinates the project and in 1995-2000 the Radiation and Nuclear Safety Authority (STUK), the Finnish Energy Industries' Federation, the Finnish Electricity Association, Fortum Oyj and Teollisuuden Voima Oy have participated in the project

  3. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    International Nuclear Information System (INIS)

    Fenham, J.

    2003-01-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO 2 , CH 4 , N 2 O, HFCs, PFCs and SF 6 . The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF 6 -emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from solvent use and other sources is included

  4. The Wiluna Uranium Project, Western Australia: Bringing a new project to the market

    International Nuclear Information System (INIS)

    Guthrie, V.

    2014-01-01

    The Wiluna Uranium Project is the first uranium mine in Western Australia to receive Government environmental approval since government policy was changed in 2008 to allow uranium mining in Western Australia. Located 960 km northeast of Perth in remote central Western Australia, the Wiluna Project comprises 76.5 million pounds U_3O_8 [~29,000 tU] in six shallow, calcrete-hosted carnotite uranium deposits. Mining is planned at a rate of 1.3 million tonnes annually to produce 2 million pounds U_3O_8 [~770 tU] production using an alkali leach process. The Project requires initial capital investment of AUD$315M and has an operating cost of US$29-31 per pound [~75-~80 USD/kgU]. During the four years it has taken to gain environmental approval, Toro also progressed technical studies to validate the economic and technical viability of the Project. These included the initial Preliminary Feasibility (PFS) to define the processing train; mining optimisation studies, a Resource Evaluation Pit (REP) and a commercial scale Pilot Plant to verify the mining and processing technologies; and finally, Phase 1 of the Definitive Feasibility Study (DFS) which focussed on the processing plant design. (author)

  5. Web-based communication tools in a European research project: the example of the TRACE project

    Directory of Open Access Journals (Sweden)

    Baeten V.

    2009-01-01

    Full Text Available The multi-disciplinary and international nature of large European projects requires powerful managerial and communicative tools to ensure the transmission of information to the end-users. One such project is TRACE entitled “Tracing Food Commodities in Europe”. One of its objectives is to provide a communication system dedicated to be the central source of information on food authenticity and traceability in Europe. This paper explores the web tools used and communication vehicles offered to scientists involved in the TRACE project to communicate internally as well as to the public. Two main tools have been built: an Intranet and a public website. The TRACE website can be accessed at http://www.trace.eu.org. A particular emphasis was placed on the efficiency, the relevance and the accessibility of the information, the publicity of the website as well as the use of the collaborative utilities. The rationale of web space design as well as integration of proprietary software solutions are presented. Perspectives on the using of web tools in the research projects are discussed.

  6. A Guide to Running a Recycling Project, Second Edition.

    Science.gov (United States)

    Oregon Recycling Information and Organizing Network, Portland.

    Today's increasing awareness of shortages has prompted people to reevaluate their consumption patterns of natural resources. In a time when there is no "away" location to throw wastes, many recycling centers have been organized. This guide contains information needed to organize and operate a recycling project. Suggestions for collection sites,…

  7. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  8. Project families: A new concept for student thesis activities

    DEFF Research Database (Denmark)

    Goltermann, Per; Ottosen, Lisbeth M.; Schmidt, Jacob Wittrup

    2017-01-01

    The students’ activities during their final thesis work have been organised in project families, i.e. a group of individual student project organized in a shared learning environment. The aim is more efficient supervision and support, simultaneously to improved learning. DTU Byg have now tested...

  9. SAGE as a Source for Undergraduate Research Projects

    Science.gov (United States)

    Hutz, Benjamin

    2017-01-01

    This article examines the use of the computer algebra system SAGE for undergraduate student research projects. After reading this article, the reader should understand the benefits of using SAGE as a source of research projects and how to commence working with SAGE. The author proposes a tiered working group model to allow maximum benefit to the…

  10. Intercultural Education in Primary School: A Collaborative Project

    Science.gov (United States)

    Santos, Marta; Araújo e Sá, Maria Helena; Simões, Ana Raquel

    2014-01-01

    In this article, we present and discuss a collaborative project on intercultural education developed by a group of educational partners. The group was made up of 12 people representing different institutions in the community, namely primary schools, cultural and social associations and the local council. The project takes an intercultural approach…

  11. Statistical Process Control. A Summary. FEU/PICKUP Project Report.

    Science.gov (United States)

    Owen, M.; Clark, I.

    A project was conducted to develop a curriculum and training materials to be used in training industrial operatives in statistical process control (SPC) techniques. During the first phase of the project, questionnaires were sent to 685 companies (215 of which responded) to determine where SPC was being used, what type of SPC firms needed, and how…

  12. Projective invariants in a conformal finsler space - I

    International Nuclear Information System (INIS)

    Mishra, C.K.; Singh, M.P.

    1989-12-01

    The projective invariants in a conformal Finsler space have been studied in regard to certain tensor and scalar which are invariant under projective transformation in a Finsler space. They have been the subject of further investigation by the present authors. (author). 8 refs

  13. Sixth-Form Projects in Biology: A Case History.

    Science.gov (United States)

    Robinson, P. M.; Parker, R. E.

    1981-01-01

    Some of the problems encountered in devising sixth-form projects are discussed and a detailed account given of one project in which a study was made of the effect of onion bulb volatiles on the germination of lettuce seed. (Author)

  14. A User's Guide to the Federal Theater Project.

    Science.gov (United States)

    Sheridan, Frank; Leslie, Linda

    1997-01-01

    Presents a lesson plan constructed around materials found in the User's Guide to the Federal Project. The Federal Theater Project produced radical and populist plays during the Great Depression before being de-funded by a conservative Congress. The lessons include activities and discussion built around the original plays. (MJP)

  15. VirtualTable: a projection augmented reality game

    DEFF Research Database (Denmark)

    Dal Corso, Alessandro; Olsen, Mikkel Damgaard; Steenstrup, Kasper Hornbak

    2015-01-01

    VirtualTable is a projection augmented reality installation where users are engaged in an interactive tower defense game. The installation runs continuously and is designed to attract people to a table, which the game is projected onto. Any number of players can join the game for an optional period...

  16. Project SAIL: An Evaluation of a Dropout Prevention Program.

    Science.gov (United States)

    Thompson, John L.; And Others

    Project SAIL (Student Advocates Inspire Learning) is a Title IV-C Project located in Hopkins, Minnesota, designed to prevent students from dropping out of school by keeping them successfully involved in the mainstream environment. This study presents a review of other dropout prevention approaches, describes the intervention strategies involved in…

  17. A Project Management Approach to M&A Deals and their Post-Integration Projects : A Case Study

    OpenAIRE

    Habibbeigi, Pooria

    2010-01-01

    Mergers and acquisitions (M&A) projects have long been considered as a strategy for organizational growth and gain of market share. Top management teams of companies take M&As into consideration since it is faster and less costly compare to internal growth and development programs. M&A project has variety of benefits such as growth in market share, increase in shareholder wealth, access to new markets, technological advantages and so on and so forth. Another benefit of such projec...

  18. A fuzzy hybrid approach for project manager selection

    Directory of Open Access Journals (Sweden)

    Ahmad Jafarnejad Chaghooshi

    2016-09-01

    Full Text Available Suitable project manager has a significant impact on successful accomplishment of the project. Managers should possess such skills in order to effectively cope with the competition. In this respect, selecting managers based on their skills can lead to a competitive advantage towards the achievement of organizational goals. selection of the suitable project manager can be viewed as a multi-criteria decision making (MCDM problem and an extensive evaluation of criteria, such as Technical skills, experience skills, Personal qualities and the related criteria must be considered in the selection process of project manager. The fuzzy set theory and MCDM methods appears as an essential tools to provide a decision framework that incorporates imprecise judgments and multi criteria nature of project manager selection process inherent in this process. This paper proposes the joint use of the Fuzzy DEMATEL (FDEMATEL and Fuzzy VIKOR methods for the decision-making process of selecting the most suitable managers for projects. First, with the opinions of the senior managers based on project management competency model (ICB-IPMA, all the criteria required for the selection are gathered. Then the FDEMATEL method is used to prioritize the importance of various criteria and FVIKOR used to rank the alternatives in a preferred order to select the best project managers from a number of alternatives. Next, a real case study used to illustrate the process of the proposed method. Finally, some conclusions are discussed at the end of this study.

  19. Planning a change project in mental health nursing.

    Science.gov (United States)

    Thorpe, Rebecca

    2015-09-02

    This article outlines a plan for a change project to improve the quality of physical health care on mental health wards. The plan was designed to improve the monitoring and recording of respiratory rates on mental health wards, through the implementation of a training programme for staff. A root cause analysis was used to explore the reasons for the low incidence of respiratory rate measurement on mental health wards, and the results of this establish the basis of the proposed change project and its aims and objectives. The article describes how the project could be implemented using a change management model, as well as how its effects could be measured and evaluated. Potential barriers to the planned change project are discussed, including the human dimensions of change. The article suggests methods to overcome such barriers, discusses the value of leadership as an important factor, and examines the principles of clinical governance in the context of the planned change project.

  20. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    Science.gov (United States)

    Romeli, Norsyakilah; Muhamad Halil, Faridah; Ismail, Faridah; Sufian Hasim, Muhammad

    2018-03-01

    As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  1. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    Directory of Open Access Journals (Sweden)

    Romeli Norsyakilah

    2018-01-01

    Full Text Available As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  2. The C.A.R.M.A. project in 2006

    International Nuclear Information System (INIS)

    Arnaud, M.

    2007-01-01

    The C.A.R.M.A. project has for objective the instrumentation of the outlet of the Rhone river with the aim of the consequences evaluation of the floods and storms on the feature evolution of the coast and on the supply in particulates materials of the Gulf of Lion. The societal applications of this project are multiple:development and conservation of the coast, the protection of the shell-fish breeding installations, evolution of fisheries, management of the water quality, as shows the various sources of given co financing (Regions Midi Pyrenees and P.A.C.A., Water Agency Rhone Mediterranean Sea Corsica and European fund of regional development (F.E.D.E.R.). One of the key points of the project is in the synergy between the land measures acquisition and the modelling. This report reports activities of the first phase of the project, its acceptance in the implementation of the instrumentation in Rhone and in its mouth. (N.C.)

  3. Lessons Learned from a Third World Water and Sanitation Project.

    Science.gov (United States)

    Jenkins-McLean, Terri

    1991-01-01

    The seven-step project cycle used in a water sanitation project in Belize from 1986-89 is described. The direct involvement of community organizations, village councils, family gatherings, parent-teacher organizations, political groups, Village Health Committees, and volunteer organizations is emphasized. (CW)

  4. Project Management using Critical Path Method (CPM): A Pragmatic ...

    African Journals Online (AJOL)

    Traditional techniques of decision-making have hindered the technical efficiency of most professionals and executors of the public project in many developing countries such as Nigeria. The use of Gantt chart in project planning has continued to increase as a source of last resort in spite of its severe limitations for ineffective ...

  5. BALCOFISH - a BONUS+ project in the Baltic Sea

    DEFF Research Database (Denmark)

    Strand, Jakob

    The project BALCOFISH, acronym for "Integration of pollutant gene responses and fish ecology in Baltic coastal fisheries and management" is a newly started 3-years BONUS+-project funded by Baltic Organisations Network for Funding Science EEIG (www.bonusportal.org) with focus on contaminants...

  6. Building a Creative Ecosystem: The Young Designers on Location Project

    Science.gov (United States)

    Davies, Dan; Howe, Alan; Haywood, Susan

    2004-01-01

    This article reports on findings from a research project designed to explore ways in which creativity can be fostered through interactions between selected children, particular environments, materials, techniques and key adults. The Young Designers on Location (YDoL) project was funded by the National Endowment for Science, Technology and the Arts…

  7. Myoglobin Structure and Function: A Multiweek Biochemistry Laboratory Project

    Science.gov (United States)

    Silverstein, Todd P.; Kirk, Sarah R.; Meyer, Scott C.; Holman, Karen L. McFarlane

    2015-01-01

    We have developed a multiweek laboratory project in which students isolate myoglobin and characterize its structure, function, and redox state. The important laboratory techniques covered in this project include size-exclusion chromatography, electrophoresis, spectrophotometric titration, and FTIR spectroscopy. Regarding protein structure,…

  8. Prioritising transport infrastructure projects: Towards a multi-criterion ...

    African Journals Online (AJOL)

    Southern African Business Review ... systematic framework for the appraisal of transport infrastructure projects of the type 'budget cycle projects with local ... Cost/benefit analysis, when applied in a classic sense, is not suitable for this purpose, given its ... (optimal allocation of resources), equity (impact distribution aspects),

  9. Pad A Treatability Study long-range project plan

    International Nuclear Information System (INIS)

    Mousseau, J.D.

    1991-08-01

    The purpose of the Pad A Treatability Study Project is to identify and demonstrate through lab- and pilot-scale testing, technologies for treating plutonium-contaminated salt waste. This document presents proposed objectives and schedules, scope of work and breakdown structure, cost elements, deployment, benefits, and change controls for the project

  10. Adoption and Use of Interorganizational ICT in a Construction Project

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    The objective of this research is to explain why actors are not using interorganizational information and communication technology (ICT) in construction projects in the intended way, by determining the mechanisms that influence the way actors use this ICT over time during a construction project.

  11. A Role for Soft Systems Methodology in ELT Projects.

    Science.gov (United States)

    Holliday, Adrian

    1990-01-01

    Discusses the uses for soft systems methodology (SSM) in English language training (ELT) projects. It is suggested that ethnographic techniques may help in achieving the understanding needed to start an ELT project while SSM may provide a useful means for structuring ethnographic findings. (Author/VWL)

  12. Managing uncertainty during r&d projects: a case study

    NARCIS (Netherlands)

    Wouters, Marc; Roorda, Berend; Gal, Ruud

    2011-01-01

    Firms make signifi cant investments in R&D projects, yet the economic return is often diffi cult to predict because of signifi cant technological and commercial uncertainty. We present an innovative and practical method for managing R&D projects, and we discuss its application to a large R&D

  13. Project Oasis : A Case Study in Jamaican Development Administration

    NARCIS (Netherlands)

    Gayle, Dennis J.; Drori, Israel D.

    1984-01-01

    This paper is concerned with development administration in practice, at the level of a particular project which was implemented in the Caribbean island of Jamaica in 1979. We are essentially concerned with the problem of the degree of fit between operational project objectives and the management of

  14. A Manhattan Project in Educational Technology, Part II.

    Science.gov (United States)

    Roberts, Wesley K.

    The initial four phases of the Training Extension Course (TEC), a project to remedy deficiencies in training programs for armed forces recruits, employed systematic instructional development and extensive audiovisual resources. The project required subcontracting for lesson production and modifications in personnel and budgeting. Posttest evidence…

  15. A Contest-Oriented Project for Learning Intelligent Mobile Robots

    Science.gov (United States)

    Huang, Hsin-Hsiung; Su, Juing-Huei; Lee, Chyi-Shyong

    2013-01-01

    A contest-oriented project for undergraduate students to learn implementation skills and theories related to intelligent mobile robots is presented in this paper. The project, related to Micromouse, Robotrace (Robotrace is the title of Taiwanese and Japanese robot races), and line-maze contests was developed by the embedded control system research…

  16. Educational integrating projects as a method of interactive learning

    Directory of Open Access Journals (Sweden)

    Иван Николаевич Куринин

    2013-12-01

    Full Text Available The article describes a method of interactive learning based on educational integrating projects. Some examples of content of such projects for the disciplines related to the study of information and Internet technologies and their application in management are presented.

  17. Project-Based Learning in Electronic Technology: A Case Study

    Science.gov (United States)

    Li, Li

    2015-01-01

    A case study of project-based learning (PBL) implemented in Tianjin University of Technology and Education is presented. This multidiscipline project is innovated to meet the novel requirements of industry while keeping its traditional effectiveness in driving students to apply knowledge to practice and problem-solving. The implementation of PBL…

  18. Selection of a portfolio of R & D projects

    NARCIS (Netherlands)

    Casault, Sébastien; Groen, Arend J.; Linton, J.D.; Linton, Jonathan; Link, A.N.; Vonortas, N.S.

    2013-01-01

    While portfolios of research are increasingly discussed, a portfolio perspective is infrequently taken when selecting two or more projects. Consequently, this chapter considers the current state of knowledge in project and portfolio selection, identifies why we can and cannot apply knowledge from

  19. Assessment of Project-Based Learning in a MECHATRONICS Context

    Science.gov (United States)

    Doppelt, Yaron

    2005-01-01

    Project-based learning (PBL) that has authenticity in the pupils' world enables the teaching of science and technology to pupils from a variety of backgrounds. PBL has the potential to enable pupils to research, plan, design, and reflect on the creation of technological projects (Doppelt, 2000). Engineering education, which is common in Israel,…

  20. Understanding new product project performance : A meta-analysis

    NARCIS (Netherlands)

    Commandeur, H.R.; Pattikawa, L.H.; Verwaal, E.

    2006-01-01

    Purpose: The purpose of this paper is to summarize the accumulated body of knowledge on the performance of new product projects and provide directions for further research. Design/methodology/approach: Using a refined classification of antecedents of new product project performance the research

  1. Project Chrysalis: The Evolution of a Community School.

    Science.gov (United States)

    Garrett, K.

    1996-01-01

    Describes the creation and operation of Project Chrysalis, a community, service-learning school transformed from row houses, where children can learn, work, and gain inspiration from artists and social entrepreneurs involved with Houston's Project Row Houses. Personal narratives of two teachers highlight the school's and students' accomplishments…

  2. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  3. A Quantitative Examination of Critical Success Factors Comparing Agile and Waterfall Project Management Methodologies

    Science.gov (United States)

    Pedersen, Mitra

    2013-01-01

    This study investigated the rate of success for IT projects using agile and standard project management methodologies. Any successful project requires use of project methodology. Specifically, large projects require formal project management methodologies or models, which establish a blueprint of processes and project planning activities. This…

  4. A Summary of NORA Project Results Related to Reactivity Measurements

    International Nuclear Information System (INIS)

    Berg, J.O.; Døderlein, J-M-; Haugset, K

    1969-01-01

    The NORA Project has been an international undertaking within the field of reactor physics, resulting from an agreement signed by the International Atomic Energy Agency and the Norwegian Government in April 1961, and subsequently renewed for three years in 1964 and one year in 1967. A summary of the research performed in the period 1961-1964 has been published in IAEA Technical Report Series no. 67. The Project work carried out through the years 1964-1968 will be covered in a forthcoming IAEA Technical Report. The main experimental facility used in the Project has been the zero-power reactor NORA Reactor kinetics, both experimental end theoretical, has been a major item of research in the NORA Project. The present report will briefly summarize results and conclusions considered relevant to the topic discussed by this Panel. Extensive referencing will be made to the final NORA Project Report

  5. Financing Renewable Energy Projects in Developing Countries: A Critical Review

    Science.gov (United States)

    Donastorg, A.; Renukappa, S.; Suresh, S.

    2017-08-01

    Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.

  6. Applying a Hybrid MCDM Model for Six Sigma Project Selection

    Directory of Open Access Journals (Sweden)

    Fu-Kwun Wang

    2014-01-01

    Full Text Available Six Sigma is a project-driven methodology; the projects that provide the maximum financial benefits and other impacts to the organization must be prioritized. Project selection (PS is a type of multiple criteria decision making (MCDM problem. In this study, we present a hybrid MCDM model combining the decision-making trial and evaluation laboratory (DEMATEL technique, analytic network process (ANP, and the VIKOR method to evaluate and improve Six Sigma projects for reducing performance gaps in each criterion and dimension. We consider the film printing industry of Taiwan as an empirical case. The results show that our study not only can use the best project selection, but can also be used to analyze the gaps between existing performance values and aspiration levels for improving the gaps in each dimension and criterion based on the influential network relation map.

  7. CooMan - a global collaborative project management system

    International Nuclear Information System (INIS)

    Souza, J.M. de; Palma, S.

    1994-01-01

    Project Coordination and Management have long been recognized as an area with growing problems and unsatisfactory solutions. Conciliating flexibility with target achievements is historically the main problem to face. The difficulties have been growing at more than linear ratio with the size and complexity of the Projects being developed in the present days. The HEP communities suffer additional challenges because of the distributed nature of the collaborations, the novelty of each project; and the less authoritarian form of leadership and management of team and individual. This prevents the adoption of more centralized focus on decision. CooMan intends to be a Global Collaborative Project Management System. This paper discusses the basic aspects of the concepts involved, outlining how task coordination, acts of speech, and World-Wide hyper media can be used to support project management activities. A distributed tool to implement such proposition is described, and a first prototype is presented

  8. The sustainable project management: A review and future possibilities

    Directory of Open Access Journals (Sweden)

    V.K. Chawla

    2018-06-01

    Full Text Available Sustainability in project operations such as financial, social and environmental sustainability is one of the most prominent issues of the present times to address. The increased focus on sus-tainable business operations has changed the viewpoint of researchers and corporate community towards the project management. Today sustainability in business operations along with sustain-ability of natural and environmental resources are of paramount significance which has further caused a huge impact on conception, planning, scheduling and execution of the project manage-ment activities. In this paper, a literature review between 1987 and 2018 on different issues af-fecting the sustainability in project management is carried out. The present study also identifies and discusses the future possibilities to apply computational procedures in order to estimate and optimize the sustainability issues in the management of projects, for example the computational evolutionary algorithms can be applied to formulate the multi-objective decision-making problem after considering critical factors of sustainability in the projects and then yielding optimized solu-tions for the formulated problem to achieve sustainability in the projects. A new integrated framework with the inclusion of feedback function for assessment of each decision and actions taken towards the sustainability of the projects is also identified and presented.

  9. Bruce A units 1 and 2 restart project

    International Nuclear Information System (INIS)

    Routledge, K.

    2006-01-01

    This presentation provides an overview of the Bruce A Units 1 and 2 Restart project from the vantage point of the Project Management Contractor (PMC). The presentation will highlight the unique structure of the project, which has been designed to maximize project efficiencies while minimizing the impact to the Bruce Power operational reactors. Efficiency improvements covered in the presentation includes: support services provided to the direct work contractors, radiation protection, worker protection, engineering, field execution, maintenance and facilities. The presentation focusses on the roles of the PMC in helping to ensure the successful outcome of this ambitious reactor refurbishment project. In addition, the Construction Island concept that has been implemented on the project will be presented, with some of the innovative thinking that has gone into its creation. The organization of the PMC and an overview of the project schedule is also presented. AMEC NCL is a privately held consultancy in the Canadian nuclear industry which provides experienced and flexible multi-disciplined resources to support full project management, engineering solutions and safety consultancy services throughout the life cycle of nuclear facilities in Canada, and for customers in related markets in North America and overseas. AMEC NCL is a wholly-owned subsidiary of AMEC plc

  10. A Project Team: a Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Kateřina

    2014-06-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part discusses a team and a group with regards to its definition, classification and basic distinction, brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work is to verify the validity of the assumptions that the analyzed team represents a very disparate group as for its composition from the perspective of personality types, types of motivation, team roles and interpersonal relations in terms of the willingness of cooperation and communication. A separate output shall focus on sociometric investigation of those team members where willingness to work together and communicate is based on the authors’ assumption of tight interdependence.

  11. A distributed execution environment for large data visualization

    International Nuclear Information System (INIS)

    Huang Jian; Liu Huadong; Beck, Micah; Gao Jinzhu; Moore, Terry

    2006-01-01

    Over the years, homogeneous computer cluster have been the most popular, and, in some sense, the only viable, platform for use in parallel visualization. In this work, we designed an execution environment for data-intensive visualization that is suitable to handle SciDAC scale datasets. This environment is solely based on computers distributed across the Internet that are owned and operated by independent institutions, while being openly shared for free. Those Internet computers are inherently of heterogeneous hardware configuration and running a variety of operating systems. Using 100 processors of such kind, we have been able to obtain the same level of performance offered by a 64-node cluster of 2.2 GHz P4 processors, while processing a 75GBs subset of TSI simulation data. Due to its inherently shared nature, this execution environment for data-intensive visualization could provide a viable means of collaboration among geographically separated SciDAC scientists

  12. From concept to construction: a 15 MW small hydro project

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, S.; Neegan, K.

    1995-12-31

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for `Mother Earth` in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project.

  13. From concept to construction: a 15 MW small hydro project

    International Nuclear Information System (INIS)

    Stephens, S.; Neegan, K.

    1995-01-01

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for 'Mother Earth' in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project

  14. ANALYSIS OF TIME MANAGEMENT APPLIED TO A PROJECT OF OIL

    Directory of Open Access Journals (Sweden)

    Arielle Meireles Moreira

    2011-05-01

    Full Text Available Project management (PM efficient results in increased probability of success of activities and its completion as time, cost and scope planned. Since this triad (time, cost and scope is connected, any changes will affect within the scope and increase the cost of the project. This was a case study in a large company exploiting oil and gas. The research is focused on time management (TM in an oil project in order to examine the schedule of activities according to the time tool, the Gantt Chart in MS Project 2003 software. The study design was selected due to its long delay in implementation and lack of planning and managing this. By analyzing the Gantt Chart, activities were identified late. With this, the problems that caused delays were surveyed (the project documents and their parents questioned. Thus, it was proposed improvements to an effective control of time on the problems encountered.

  15. A Project Team: A Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Katerina Hrazdilova Bockova

    2013-11-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part which discusses a team and a group with regards to its definition, classification and basic distinction brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work was to determine whether the existing team is not by its nature rather a working group that contributes to the generally perceived stagnation of that field.

  16. A portfolio evaluation framework for air transportation improvement projects

    Science.gov (United States)

    Baik, Hyeoncheol

    This thesis explores the application of portfolio theory to the Air Transportation System (ATS) improvement. The ATS relies on complexly related resources and different stakeholder groups. Moreover, demand for air travel is significantly increasing relative to capacity of air transportation. In this environment, improving the ATS is challenging. Many projects, which are defined as technologies or initiatives, for improvement have been proposed and some have been demonstrated in practice. However, there is no clear understanding of how well these projects work in different conditions nor of how they interact with each other or with existing systems. These limitations make it difficult to develop good project combinations, or portfolios that maximize improvement. To help address this gap, a framework for identifying good portfolios is proposed. The framework can be applied to individual projects or portfolios of projects. Projects or portfolios are evaluated using four different groups of factors (effectiveness, time-to-implement, scope of applicability, and stakeholder impacts). Portfolios are also evaluated in terms of interaction-determining factors (prerequisites, co-requisites, limiting factors, and amplifying factors) because, while a given project might work well in isolation, interdependencies between projects or with existing systems could result in lower overall performance in combination. Ways to communicate a portfolio to decision makers are also introduced. The framework is unique because (1) it allows using a variety of available data, and (2) it covers diverse benefit metrics. For demonstrating the framework, an application to ground delay management projects serves as a case study. The portfolio evaluation approach introduced in this thesis can aid decision makers and researchers at universities and aviation agencies such as Federal Aviation Administration (FAA), National Aeronautics and Space Administration (NASA), and Department of Defense (DoD), in

  17. A Strategic Project Appraisal framework for ecologically sustainable urban infrastructure

    International Nuclear Information System (INIS)

    Morrissey, John; Iyer-Raniga, Usha; McLaughlin, Patricia; Mills, Anthony

    2012-01-01

    Actors in the built environment are progressively considering environmental and social issues alongside functional and economic aspects of development projects. Infrastructure projects represent major investment and construction initiatives with attendant environmental, economic and societal impacts across multiple scales. To date, while sustainability strategies and frameworks have focused on wider national aspirations and strategic objectives, they are noticeably weak in addressing micro-level integrated decision making in the built environment, particularly for infrastructure projects. The proposed approach of this paper is based on the principal that early intervention is the most cost-effective and efficient means of mitigating the environmental effects of development projects, particularly macro infrastructure developments. A strategic overview of the various project alternatives, taking account for stakeholder and expert input, could effectively reduce project impacts/risks at low cost to the project developers but provide significant benefit to wider communities, including communities of future stakeholders. This paper is the first exploratory step in developing a more systematic framework for evaluating strategic alternatives for major metropolitan infrastructure projects, based on key sustainability principles. The developed Strategic Project Appraisal (SPA) framework, grounded in the theory of Strategic Environmental Assessment (SEA), provides a means of practically appraising project impacts and alternatives in terms of quantified ecological limits; addresses the neglected topic of metropolitan infrastructure as a means of delivering sustainability outcomes in the urban context and more broadly, seeks to open a debate on the potential for SEA methodology to be more extensively applied to address sustainability challenges in the built environment. Practically applied and timed appropriately, the SPA framework can enable better decision-making and more

  18. A Conceptual Grey Analysis Method for Construction Projects

    Directory of Open Access Journals (Sweden)

    Maria Mikela Chatzimichailidou

    2015-05-01

    Full Text Available Concerning engineers, project management is a crucial field of research and development. Projects of high uncertainty and scale are characterized by risk, primarily related to their completion time. Thus, safe duration estimations, throughout the planning of a project, are a key objective for project managers. However, traditional linear approaches fail to include and sufficiently serve the dynamic nature of activities duration. On this ground, attention should be paid to designing and implementing methodologies that approximate the duration of the activities during the phase of planning and scheduling too. The grey analysis mathematical modeling seems to gain grounds, since it gradually becomes a well-adapted and up-to-date technique for numerous scientific sectors. This paper examines the contribution of the logic behind the aforementioned analysis, aiming to predict possible future divergences of task durations in big construction projects. Based on time observations of critical instances, a conceptual method is developed for making duration estimations and communicating deviations from the original schedule, in a way that approximations will fit reality better. The whole procedure endeavors to investigate the decrease of uncertainty, regarding project completion time and reduce, up to a scale, a possible inaccurate estimation of a project manager. The utmost effort is about exploiting the gained experience and eliminating the “hedgehog syndrome”. This is attainable by designing a reliable, easily updated, and readable information system. An enlightening example is to be found in the last section.

  19. The Sphagnome Project: enabling ecological and evolutionary insights through a genus-level sequencing project.

    Science.gov (United States)

    Weston, David J; Turetsky, Merritt R; Johnson, Matthew G; Granath, Gustaf; Lindo, Zoë; Belyea, Lisa R; Rice, Steven K; Hanson, David T; Engelhardt, Katharina A M; Schmutz, Jeremy; Dorrepaal, Ellen; Euskirchen, Eugénie S; Stenøien, Hans K; Szövényi, Péter; Jackson, Michelle; Piatkowski, Bryan T; Muchero, Wellington; Norby, Richard J; Kostka, Joel E; Glass, Jennifer B; Rydin, Håkan; Limpens, Juul; Tuittila, Eeva-Stiina; Ullrich, Kristian K; Carrell, Alyssa; Benscoter, Brian W; Chen, Jin-Gui; Oke, Tobi A; Nilsson, Mats B; Ranjan, Priya; Jacobson, Daniel; Lilleskov, Erik A; Clymo, R S; Shaw, A Jonathan

    2018-01-01

    Considerable progress has been made in ecological and evolutionary genetics with studies demonstrating how genes underlying plant and microbial traits can influence adaptation and even 'extend' to influence community structure and ecosystem level processes. Progress in this area is limited to model systems with deep genetic and genomic resources that often have negligible ecological impact or interest. Thus, important linkages between genetic adaptations and their consequences at organismal and ecological scales are often lacking. Here we introduce the Sphagnome Project, which incorporates genomics into a long-running history of Sphagnum research that has documented unparalleled contributions to peatland ecology, carbon sequestration, biogeochemistry, microbiome research, niche construction, and ecosystem engineering. The Sphagnome Project encompasses a genus-level sequencing effort that represents a new type of model system driven not only by genetic tractability, but by ecologically relevant questions and hypotheses. © 2017 UT-Battelle New Phytologist © 2017 New Phytologist Trust.

  20. Simple Tools to Facilitate Project Management of a Nursing Research Project.

    Science.gov (United States)

    Aycock, Dawn M; Clark, Patricia C; Thomas-Seaton, LaTeshia; Lee, Shih-Yu; Moloney, Margaret

    2016-07-01

    Highly organized project management facilitates rigorous study implementation. Research involves gathering large amounts of information that can be overwhelming when organizational strategies are not used. We describe a variety of project management and organizational tools used in different studies that may be particularly useful for novice researchers. The studies were a multisite study of caregivers of stroke survivors, an Internet-based diary study of women with migraines, and a pilot study testing a sleep intervention in mothers of low-birth-weight infants. Project management tools were used to facilitate enrollment, data collection, and access to results. The tools included protocol and eligibility checklists, event calendars, screening and enrollment logs, instrument scoring tables, and data summary sheets. These tools created efficiency, promoted a positive image, minimized errors, and provided researchers with a sense of control. For the studies described, there were no protocol violations, there were minimal missing data, and the integrity of data collection was maintained. © The Author(s) 2016.

  1. Exercise Countermeasures Demonstration Project During the Lunar-Mars Life Support Test Project Phase 2A

    Science.gov (United States)

    Lee, Stuart M. C.; Guilliams, Mark E.; Moore, Alan D., Jr.; Williams, W. Jon; Greenisen, M. C.; Fortney, S. M.

    1998-01-01

    This demonstration project assessed the crew members' compliance to a portion of the exercise countermeasures planned for use onboard the International Space Station (ISS) and the outcomes of their performing these countermeasures. Although these countermeasures have been used separately in other projects and investigations, this was the first time they'd been used together for an extended period (60 days) in an investigation of this nature. Crew members exercised every day for six days, alternating every other day between aerobic and resistive exercise, and rested on the seventh day. On the aerobic exercise days, subjects exercised on an electronically braked cycle ergometer using a protocol that has been previously shown to maintain aerobic capacity in subjects exposed to a space flight analogue. On the resistive exercise days, crew members performed five major multijoint resistive exercises in a concentric mode, targeting those muscle groups and bones we believe are most severely affected by space flight. The subjects favorably tolerated both exercise protocols, with a 98% compliance to aerobic exercise prescription and a 91% adherence to the resistive exercise protocol. After 60 days, the crew members improved their peak aerobic capacity by an average 7%, and strength gains were noted in all subjects. These results suggest that these exercise protocols can be performed during ISS, lunar, and Mars missions, although we anticipate more frequent bouts with both protocols for long-duration spaceflight. Future projects should investigate the impact of increased exercise duration and frequency on subject compliance, and the efficacy of such exercise prescriptions.

  2. Project-Management Tools for Libraries: A Planning and Implementation Model Using Microsoft Project 2000

    OpenAIRE

    Ying Zhang; Corinne Bishop

    2005-01-01

    This paper discusses how Microsoft Project 2000 was utilized at the University of Central Florida Libraries to manage an e-reference implementation project. As libraries today adopt more information technologies, efficiently managing projects can be challenging. The authors’ experience in the implementation of QuestionPoint e-reference software in October 2003 is described. Their conclusion illustrates that project-management tools, such as Microsoft Project 2000, offer practical workflow-man...

  3. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  4. Managing projects in a digital government | Onyemaobi | Journal of ...

    African Journals Online (AJOL)

    The process of developing a new system in a Digital Government is a kind of planned ... management ensures the application of information technology knowledge, ... Keywords: Digital Government, System Development, Project Management, ...

  5. A Translation Dictionary of Phrasal Verbs: An Ongoing Project ...

    African Journals Online (AJOL)

    A Translation Dictionary of Phrasal Verbs: An Ongoing Project. ... Abstract. The paper centres on a plan for an English-Arabic phrasal verb dictionary for Arab trainee translators. Such a dictionary ... AJOL African Journals Online. HOW TO USE ...

  6. Scaling the quality of clinical audit projects: a pilot study.

    Science.gov (United States)

    Millard, A D

    1999-06-01

    To pilot the development of a scale measuring the quality of audit projects through audit project reports. Statements about clinical audit projects were selected from existing instruments, assessing the quality of clinical audit projects, to form a Likert scale. The audit facilitators were based in Scottish health boards and trusts. The participants were audit facilitators known to have over 2 years experience of supporting clinical audit. The response at first test was 11 out of 14 and at the second test it was 27 out of 46. The draft scale was tested by 27 audit facilitators who expressed their strength of agreement or disagreement with each statement for three reports. Validity was assessed by test-re-test, item-total, and total-global indicator correlations. Of the 20 statements, 15 had satisfactory correlations with scale totals. Scale totals had good correlations with global indicators. Test-re-test correlation was modest. The wide range of responses means further research is needed to measure the consistency of audit facilitators' interpretations, perhaps comparing a trained group with an untrained group. There may be a need for a separate scale for reaudits. Educational impact is distinct from project impact generally. It may be more meaningful to treat the selection of projects and aims, methodology and impact separately as subscales and take a project profiling approach rather than attempting to produce a global quality index.

  7. Designing an Academic Project Management Program: A Collaboration between a University and a PMI Chapter

    Science.gov (United States)

    Poston, Robin S.; Richardson, Sandra M.

    2011-01-01

    The demand for project management skills in industry is increasing resulting in a higher demand for project management educational programs. Universities are addressing industry demand by developing project management courses, degree offerings and certificate programs that focus on both technical and general project management skills. While…

  8. Conception of personal career as a self-realization project

    OpenAIRE

    Tarasova, Julija

    2017-01-01

    SUMMARY Conception of personal career as a self-realization project. Bachelor work. Relevance: Nowadays career is an important aspect in an individual’s life where the main author of the script, the director and creator is the person who takes responsibility for his/her own life. Modern career management is a life long process, which is more like a self monitored project based on self realisation. A successful career in project management is not only about an individual’s personal qualities, ...

  9. Expansive Learning in Construction Projects - a Contradiction in terms?

    DEFF Research Database (Denmark)

    Klitgaard, Anne; Nissen, Søren Bülow; Beck, Frederikke

    2016-01-01

    This research is a preliminary study performed as part of a primary research into expansive learning in interorganizational network set up to solve a construction project. The construction industry has long had issues about productivity, which can be an indication of lack of learning. A case study...... acquisition and participation but not by expansive learning. The construction industry needs to accept that the learning generated from projects will be limited to learning by acquisition and participation. The interorganizational network cannot facilitate expansive learning while working on object......-fixed projects. Research in construction management fails to generate and document knowledge because of the limitations of case studies....

  10. A web-based repository of surgical simulator projects.

    Science.gov (United States)

    Leskovský, Peter; Harders, Matthias; Székely, Gábor

    2006-01-01

    The use of computer-based surgical simulators for training of prospective surgeons has been a topic of research for more than a decade. As a result, a large number of academic projects have been carried out, and a growing number of commercial products are available on the market. Keeping track of all these endeavors for established groups as well as for newly started projects can be quite arduous. Gathering information on existing methods, already traveled research paths, and problems encountered is a time consuming task. To alleviate this situation, we have established a modifiable online repository of existing projects. It contains detailed information about a large number of simulator projects gathered from web pages, papers and personal communication. The database is modifiable (with password protected sections) and also allows for a simple statistical analysis of the collected data. For further information, the surgical repository web page can be found at www.virtualsurgery.vision.ee.ethz.ch.

  11. Hygiena 3, a Forgotten Project for Electrolytic Water Treatment

    Directory of Open Access Journals (Sweden)

    Kryštof Drnek

    2012-01-01

    Full Text Available In the interwar period, the city of Prague had to resolve the problem of treating the polluted water produced by its citizens. From 1933 - 1936 an ambitious competition was held. The idea behind the competition was to bring in new ideas and projects for a new water treatment station.Hygiena 3 was one of the projects that was submitted. It proposed a treatment procedure based on electrolytic consolidation of contaminants in water into flocks. The project was found to be inventive and interesting but too expensive and not effective. Nevertheless it was evaluated as a well developed proposal and received an award from the city.

  12. The Stripa project in a Swedish waste management perspective

    International Nuclear Information System (INIS)

    Bjurstroem, S.

    1994-01-01

    This publication deals with the Swedish nuclear waste management program till the 60s; it also consists of a presentation of the Stripa Project, that played a important role in the research development work in Sweden. This project was carried out in collaboration with the United States, and an international participation was organized. The primary goals of this project were to develop scientific techniques to characterize a granite rock. The issues of such studies were of common concern to many countries that had research and development programs on the disposal of high-level radioactive wastes. (TEC)

  13. A Function-Based Framework for Stream Assessment & Restoration Projects

    Science.gov (United States)

    This report lays out a framework for approaching stream assessment and restoration projects that focuses on understanding the suite of stream functions at a site in the context of what is happening in the watershed.

  14. Generalized projective synchronization of a unified chaotic system

    International Nuclear Information System (INIS)

    Yan Jianping; Li Changpin

    2005-01-01

    In the present paper, a simple but efficient control technique of the generalized projective synchronization is applied to a unified chaotic system. Numerical simulations show that this method works very well, which can also be applied to other chaotic systems

  15. Evaluation of the Treatment of Diabetic Retinopathy A Research Project

    Science.gov (United States)

    Kupfer, Carl

    1973-01-01

    Evaluated is the treatment of diabetic retinopathy (blindness due to ruptured vessels of the retina as a side effect of diabetes), and described is a research project comparing two types of photocoagulation treatment. (DB)

  16. Project scheduling method with time using MRP system – A case study: Construction project in Libya

    Directory of Open Access Journals (Sweden)

    Abdallah Ali Imetieg

    2015-04-01

    Full Text Available Materials Requirements and Planning (MRP is a system of production planning and inventory control, which is used to manage manufacturing processes. Most MRP systems are software-based and are used to ensure that the materials are available for production, that the products are available for delivery to customers, that the lowest possible material and product level is maintained in store, as well as to plan delivery schedules and purchasing activities. Upon completion of scheduling, begins the process of follow-up, which includes the achievement of the project goals in terms of quantity, quality and costs in accordance with deadlines. MRP system was applied to project of 5000 housing units in Solug area, which is close to Benghazi city, Libya, with the aim to provide necessary cash flow to pay dues on time without delay to all involved project sub-contractors and material suppliers, to ensure the smooth flow of operations, as well as to diminish costs by reduction of temporary storages and rented areas. There is a correlation between time and cost of each activity. If the required time is shorter than the scheduled time of the certain activity, it would demand more resources, which further leads to the increase in direct costs of the given activity. Therefore, the output of MRP is important since commands are issued through planning in order to launch the suggested orders with the required quantities and within the limited time period.

  17. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  18. EXPLORING PROJECT-RELATED FACTORS THAT INFLUENCE LEADERSHIP STYLES AND THEIR EFFECT ON PROJECT PERFORMANCE: A CONCEPTUAL FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Suzaan Pretorius

    2017-12-01

    Full Text Available It is widely accepted that project leaders should adapt their behaviour to meet the unique leadership demands of a variety of situations. Recently, vertical, shared, and horizontal styles of leadership have gained prominence, especially in the project management literature. Several factors are believed to play a role in determining an appropriate balance between these leadership styles. This theoretical study explores the influence of project types, the stage in the project life cycle, organisational project management maturity, and the level of trust and collaboration between project team members on the appropriate balance of leadership styles in projects. This paper presents a conceptual framework of these factors, while empirical results will be reported on in the sequel to this paper.

  19. Integrating public information activities on a technical project

    International Nuclear Information System (INIS)

    Little, Sh. K.; Vecchiola, S.F.

    1984-01-01

    Through gradual evolution and successful performance, the WIPP Communications group has gained respect and recognition as a dual service organization that offers numerous benefits to a technical project. Westinghouse assembled a team that has successfully coordinated and encouraged an exchange of information not only with the public information realm but also as a project service and function. WIPP has combined educational services, external and employee communication and public information into one unit called ''Communications''

  20. Grant Project Information via a Shared Data Base

    Directory of Open Access Journals (Sweden)

    Justine Roberts

    1973-09-01

    Full Text Available A quarterly keyword index to campus grant projects is provided by the Health Science Library at the University of California, San Francisco, using a data base created and maintained by the campus' Contracts & Grants Office. The index is printed in KWOC format, using the chief investigator's name as the key to a section of project summaries. A third section is also included, listing the summaries under the name of the sponsoring department.

  1. A root cause analysis project in a medication safety course.

    Science.gov (United States)

    Schafer, Jason J

    2012-08-10

    To develop, implement, and evaluate team-based root cause analysis projects as part of a required medication safety course for second-year pharmacy students. Lectures, in-class activities, and out-of-class reading assignments were used to develop students' medication safety skills and introduce them to the culture of medication safety. Students applied these skills within teams by evaluating cases of medication errors using root cause analyses. Teams also developed error prevention strategies and formally presented their findings. Student performance was assessed using a medication errors evaluation rubric. Of the 211 students who completed the course, the majority performed well on root cause analysis assignments and rated them favorably on course evaluations. Medication error evaluation and prevention was successfully introduced in a medication safety course using team-based root cause analysis projects.

  2. Implementing a Zero Energy Ready Home Multifamily Project

    Energy Technology Data Exchange (ETDEWEB)

    Springer, David [Alliance for Residential Building Innovation, Davis, CA (United States); German, Alea [Alliance for Residential Building Innovation, Davis, CA (United States)

    2015-08-01

    An objective of this project was to gain a highly visible foothold for residential buildings built to the U.S. Department of Energy's Zero Energy Ready Home (ZERH) specification that can be used to encourage participation by other California builders. This report briefly describes two single family homes that were ZERH-certified, and focuses on the experience of working with developer Mutual Housing on a 62 unit multi-family community at the Spring Lake subdivision in Woodland, CA. The Spring Lake project is expected to be the first ZERH certified multi-family project nationwide. This report discusses challenges encountered, lessons learned, and how obstacles were overcome.

  3. A method multi criterio to evaluate projects of rural electrification

    International Nuclear Information System (INIS)

    Gonzalez Posse, E.

    1994-01-01

    In this document about the problem of the evaluation projects methodologies in rural electrification.The low analysis problem is of complex nature, because each project is evaluation object and an economic agent. One of these agents identifies different benefits and cost, and also has a different approaches for value them.In consequence, the form in that it is carried out the evaluation of the one project for each one of this agents that it is usually solved for mechanisms linked to the capacity of incidence or of determination of each one of them, this does not assures a satisfactory results for the general interest

  4. Evaluation model of project complexity for large-scale construction projects in Iran - A Fuzzy ANP approach

    Directory of Open Access Journals (Sweden)

    Aliyeh Kazemi

    2016-09-01

    Full Text Available Construction projects have always been complex. By growing trend of this complexity, implementations of large-scale constructions become harder. Hence, evaluating and understanding these complexities are critical. Correct evaluation of a project complication can provide executives and managers with good source to use. Fuzzy analytic network process (ANP is a logical and systematic approach toward defining, evaluation, and grading. This method allows for analyzing complex systems, and determining complexity of them. In this study, by taking advantage of fuzzy ANP, effective indexes for development of complications in large-scale construction projects in Iran have been determined and prioritized. The results show socio-political, project system interdependencies, and technological complexity indexes ranked top to three. Furthermore, in comparison of three main huge projects: commercial-administrative, hospital, and skyscrapers, the hospital project had been evaluated as the most complicated. This model is beneficial for professionals in managing large-scale projects.

  5. A basic framework for managing time of nuclear plant projects

    International Nuclear Information System (INIS)

    Beck, J.R.

    1987-01-01

    One of the crucial problems that faces managers of nuclear power plant projects is how to obtain more effective and efficient utilization of their company's resources. Analysis of this problem showed that improvement was necessary in the time management area. Time management is one of the primary functions of project groups. Much has been written about planning and scheduling, and there are many modern techniques (CPM, PERT, etc.) available to a project group to manage time. So, why is time management still a problem? One reason is that nuclear projects are generally very complex and involve many organizations requiring the same resources. It is the intent of this paper to present a comprehensive and basic framework on which to either build a time management system or use as a basis to assess an existing system

  6. L2 Quality as a Competitive Edge - Project Presentation

    DEFF Research Database (Denmark)

    Ditlevsen, Marianne Grove; Kastberg, Peter

    2000-01-01

    In our paper we would like to present an interdisciplinary project "L2 as a Competitive Edge". We'll be doing this by first giving you a project overview in section 0. The overview will then in the section 1 and 2 be followed by a presentation of two of the most interesting themes, serving as point...... of departure for further discussion. The two themes are "The evaluation of language quality" and "Method - an Integrated Approach"....

  7. Lessons learnt from a primary care asthma improvement project.

    Science.gov (United States)

    Lenney, Warren; Clayton, Sadie; Gilchrist, Francis J; Price, David; Small, Iain; Smith, Judy; Sutton, Emma J

    2016-01-07

    Asthma is a very common disease that can occur at any age. In the UK and in many other countries it is mainly managed in primary care. The published evidence suggests that the key to improving diagnosis and management lies in better training and education rather than in the discovery of new medications. An asthma improvement project managed through the British Lung Foundation is attempting to do this. The project has three pilot sites: two in England supported by the Department of Health and one in Scotland supported by the Scottish Government. If the project is successful it will be rolled out to other health areas within the UK. The results of this project are not yet available. This article highlights the challenges encountered in setting up the project and may well be applicable to other areas in the UK and to other countries where similar healthcare systems exist. The encountered challenges reflect the complex nature of healthcare systems and electronic data capture in primary care. We discuss the differences between general practices in their ability and willingness to support the project, the training and education of their staff on asthma management, governance issues in relation to information technology systems, and the quality of data capture. Virtually all the challenges have now been overcome, but discussing them should ensure that others become aware of them at an early stage should they wish to undertake similar projects in the future.

  8. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...

  9. Cacao Intensification in Sulawesi: A Green Prosperity Model Project

    Energy Technology Data Exchange (ETDEWEB)

    Moriarty, K.; Elchinger, M.; Hill, G.; Katz, J.; Barnett, J.

    2014-09-01

    NREL conducted eight model projects for Millennium Challenge Corporation's (MCC) Compact with Indonesia. Green Prosperity, the largest project of the Compact, seeks to address critical constraints to economic growth while supporting the Government of Indonesia's commitment to a more sustainable, less carbon-intensive future. This study evaluates techniques to improve cacao farming in Sulawesi Indonesia with an emphasis on Farmer Field Schools and Cocoa Development Centers to educate farmers and for train the trainer programs. The study estimates the economic viability of cacao farming if smallholder implement techniques to increase yield as well as social and environmental impacts of the project.

  10. Process competencies in a problem and project based learning environment

    DEFF Research Database (Denmark)

    Du, Xiangyun; Kolmos, Anette

    2006-01-01

    with the expected professional competencies. Based on the educational practice of PBL Aalborg Model, which is characterized by problem-orientation, project-organization and team work, this paper examines the process of developing process competencies through studying engineering in a PBL environment from...... process competencies through doing problem and project based work in teams? 2) How do students perceive their achievement of these process competencies?......Future engineers are not only required to master technological competencies concerning solving problems, producing and innovating technology, they are also expected to have capabilities of cooperation, communication, and project management in diverse social context, which are referred to as process...

  11. A European Project on Vacuum Tube Amplifiers for THz Amplification

    DEFF Research Database (Denmark)

    Paoloni, Claudio; Di Carlo, Aldo; Brunetti, Francesca

    2012-01-01

    The OPTHER (Optically Driven THz amplifier) project supported by the European Commission within the Seventh Framework Program (FP7) represents the first joint European attempt to realize vacuum electron devices in THz range. The target of the project was to design and realize the first 1 THz vacuum...... tube amplifier. The challenges of the presented task and the innovative solutions adopted established a new level of knowledge in the field. The main aspects of the OPTHER project are described, focusing on challenges and adopted innovative solutions....

  12. The Human Genome Project (HGP): dividends and challenges: a ...

    African Journals Online (AJOL)

    The Human Genome Project (HGP): dividends and challenges: a review. ... Genomic studies have given profound insights into the genetic organization of ... with it will be an essential part of modern medicine and biology for years to come.

  13. New Jersey: Clean Air Communities (A Former EPA CARE Project)

    Science.gov (United States)

    Clean Air Communities (CAC) is the recipient of a Level II CARE cooperative agreement to implement recommendations by the state’s Environmental Justice Task Force and the Air Toxics Pilot Project to reduce environmental risks.

  14. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  15. Particulate Air Contamination in Puerto Rico: A Student Involvement Project.

    Science.gov (United States)

    Eckert, Richard R.

    1979-01-01

    Describes a research project undertaken by physics undergraduate students to monitor particulate air contamination in Ponce, Puerto Rico, and to determine the meteorological factors which contribute to it. (GA)

  16. Pad A treatability study long-range project plan

    International Nuclear Information System (INIS)

    Mousseau, J.D.

    1991-06-01

    This plan addresses the work to be accomplished by the Pad A Treatability Study Project. The purpose of this project is to investigate potential treatment and separation technologies, identify the best technologies, and to demonstrate by both lab- and pilot-scale demonstration, the most applicable remedial technologies for treating plutonium-contaminated salts at the Pad A site located at the Subsurface Disposal Area (SDA) at the Radioactive Waste Management Complex (RWMC) a the Idaho National Engineering Laboratory (INEL). The conduct of this project will be supported by other DOE laboratories, universities, and private industries, who will provide support for near-term demonstrations of treatment and separation technologies. The purpose of this long-range planning document is to present the detailed plan for the implementation of the Pad A Treatability Study Project

  17. Impact of a quality improvement project to strengthen infection ...

    African Journals Online (AJOL)

    Impact of a quality improvement project to strengthen infection prevention and control training at rural healthcare facilities. ... African Journal of Health Professions Education. Journal Home · ABOUT THIS JOURNAL · Advanced Search ...

  18. A Project Manager's Personal Attributes as Predictors for Success

    National Research Council Canada - National Science Library

    Valencia, Vhance V

    2007-01-01

    ...) possess that lead them to project management success. Numerous attributes are identified in the literature through a variety of methods, but very few studies relate specific qualities to success...

  19. Modernising patient clothing: a Florence Nightingale Foundation project.

    Science.gov (United States)

    Fitzgerald, Christine

    2017-04-27

    Christine Fitzgerald, Matron at The Hillingdon Hospitals NHS Foundation Trust (currently on secondment) discusses a project to boost patient self-esteem and dignity through the clothing provided for them to wear.

  20. Lambdastation: a forwarding and admission control service to interface production network facilities with advanced research network paths

    Energy Technology Data Exchange (ETDEWEB)

    DeMar, Philip; Petravick, Don; /Fermilab

    2004-12-01

    Over the past several years, there has been a great deal of research effort and funding put into the deployment of optical-based, advanced technology wide-area networks. Fermilab and CalTech have initiated a project to enable our production network facilities to exploit these advanced research network facilities. Our objective is to forward designated data transfers across these advanced wide area networks on a per-flow basis, making use our capacious production-use storage systems connected to the local campus network. To accomplish this, we intend to develop a dynamically provisioned forwarding service that would provide alternate path forwarding onto available wide area advanced research networks. The service would dynamically reconfigure forwarding of specific flows within our local production-use network facilities, as well as provide an interface to enable applications to utilize the service. We call this service LambdaStation. If one envisions wide area optical network paths as high bandwidth data railways, then LambdaStation would functionally be the railroad terminal that regulates which flows at the local site get directed onto the high bandwidth data railways. LambdaStation is a DOE-funded SciDac research project in its very early stage of development.

  1. A project management focused framework for assuring quality work processes

    Energy Technology Data Exchange (ETDEWEB)

    Gamsby, S.O.; Mize, J.D. [Allied Signal, Inc., Albuquerque, NM (United States). Federal Mfg. and Technologies; Reid, R.A. [New Mexico Univ., Albuquerque, NM (United States)

    1996-10-01

    Federal Manufacturing & Technologies/New Mexico (FM&T/NM) of AlliedSignal is an organization of approximately 300 associates providing operations support, engineering, and other technical services for DOE, New Mexico`s National Laboratories, etc. Work performed is primarily project-oriented and ranges from executing a major long-term contract for retrofitting and maintaining a large fleet of escort vehicles to creating a single, small, prototype electronic device for measuring radiation in a unique environment. FM&T/NM is functionally organized and operates in a classic matrix format with functional departments providing personnel with technical expertise, necessary physical resources, and administrative support to several project-based groups. Like most matrix-based organizations that provide support to diverse customers, FM&T/NM has encountered problems that occur when a group of project managers is expected to work together in using and scheduling a shared set of limited resources for the good of the organization as a whole. The framework for managing projects that we present focuses on developing, understanding, and managing the relationships between the functional organization structure, the system of work processes, and the management of projects. FM&T/NM retains its functional structure which primarily assigns personnel to work processes. The evolving role of the process leader focuses primarily on designing, managing, and improving the process, and the interactions among the subprocesses. The project manager is responsible for (1) translating customer requirements into product specifications, (2) determining the sequence of activities needed to meet project goals, (3) scheduling the required work processes, (4) monitoring project progress, (5) providing liaison between the customer and process leaders, and (6) having the desired product and/or service delivered to a satisfied customer in a timely manner.

  2. A comprehensive crop genome research project: the Superhybrid Rice Genome Project in China.

    Science.gov (United States)

    Yu, Jun; Wong, Gane Ka-Shu; Liu, Siqi; Wang, Jian; Yang, Huanming

    2007-06-29

    In May 2000, the Beijing Institute of Genomics formally announced the launch of a comprehensive crop genome research project on rice genomics, the Chinese Superhybrid Rice Genome Project. SRGP is not simply a sequencing project targeted to a single rice (Oryza sativa L.) genome, but a full-swing research effort with an ultimate goal of providing inclusive basic genomic information and molecular tools not only to understand biology of the rice, both as an important crop species and a model organism of cereals, but also to focus on a popular superhybrid rice landrace, LYP9. We have completed the first phase of SRGP and provide the rice research community with a finished genome sequence of an indica variety, 93-11 (the paternal cultivar of LYP9), together with ample data on subspecific (between subspecies) polymorphisms, transcriptomes and proteomes, useful for within-species comparative studies. In the second phase, we have acquired the genome sequence of the maternal cultivar, PA64S, together with the detailed catalogues of genes uniquely expressed in the parental cultivars and the hybrid as well as allele-specific markers that distinguish parental alleles. Although SRGP in China is not an open-ended research programme, it has been designed to pave a way for future plant genomics research and application, such as to interrogate fundamentals of plant biology, including genome duplication, polyploidy and hybrid vigour, as well as to provide genetic tools for crop breeding and to carry along a social burden-leading a fight against the world's hunger. It began with genomics, the newly developed and industry-scale research field, and from the world's most populous country. In this review, we summarize our scientific goals and noteworthy discoveries that exploit new territories of systematic investigations on basic and applied biology of rice and other major cereal crops.

  3. Advertising Citizen Science: A Trailer for the Citizen Sky Project

    Science.gov (United States)

    Wyatt, Ryan; Price, A.

    2012-01-01

    Citizen Sky is a multi-year, NSF funded citizen science project involving the bright and mysterious variable star epsilon Aurigae. The project was conceived by the IYA 2009 working group on Research Experiences for Students, Teachers, and Citizen-Scientists. Citizen Sky goes beyond simple observing to include a major data analysis component, introducing participants to the full scientific process from background research to paper writing for a peer-reviewed journal. As a means of generating interest in the project, the California Academy of Sciences produced a six-minute "trailer” formatted for both traditional and fulldome planetariums as well as HD and web applications. This talk will review the production process for the trailer as well as the methods of distribution via planetariums, social media, and other venues_along with an update on the Citizen Sky Project as a whole. We will show how to use a small, professionally-produced planetarium trailer to help spread word on a citizen science project. We will also show preliminary results on a study about how participation level/type in the project affects science learning.

  4. A Test of the Validity of Projective and Quasi-Projective Measures of Interpersonal Distance.

    Science.gov (United States)

    Jones, Stanley E.; Aiello, John R.

    1979-01-01

    Discusses research supporting the conclusion that projective and quasi-projective measures of interpersonal distance do not measure the same phenomena as interactional measures. It is possible that they are more indicative of psychological rather than physical distance. (JMF)

  5. Defining and implementing a model for pharmacy resident research projects

    Directory of Open Access Journals (Sweden)

    Dick TB

    2015-09-01

    Full Text Available Objective: To describe a standard approach to provide a support structure for pharmacy resident research that emphasizes self-identification of a residency research project. Methods: A subcommittee of the residency advisory committee was formed at our institution. The committee was initially comprised of 2 clinical pharmacy specialists, 1 drug information pharmacist, and 2 pharmacy administrators. The committee developed research guidelines that are distributed to residents prior to the residency start that detail the research process, important deadlines, and available resources. Instructions for institutional review board (IRB training and deadlines for various assignments and presentations throughout the residency year are clearly defined. Residents conceive their own research project and emphasis is placed on completing assignments early in the residency year. Results: In the 4 years this research process has been in place, 15 of 16 (94% residents successfully identified their own research question. All 15 residents submitted a complete research protocol to the IRB by the August deadline. Four residents have presented the results of their research at multi-disciplinary national professional meetings and 1 has published a manuscript. Feedback from outgoing residents has been positive overall and their perceptions of their research projects and the process are positive. Conclusion: Pharmacy residents selecting their own research projects for their residency year is a feasible alternative to assigning or providing lists of research projects from which to select a project.

  6. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2013-01-01

    Today, with the growth of complex projects, stakeholder involvement in projects, advances in computer technology for dashboard designs, metrics, and key performance indicators for project management have become an important focus. This Second Edition of the bestselling book walks readers through everything from the basics of project management metrics and key performance indicators to establishing targets and using dashboards to monitor performance. The content is aligned with PMI's PMBOK Guide and stresses "value" as the main focal point.

  7. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  8. Introducing Principles of Land Surveying by Assigning a Practical Project

    OpenAIRE

    Introducing Principles of Land Surveying by Assigning a Practical Project

    2016-01-01

    A practical project is used in an engineering surveying course to expose sophomore and junior civil engineering students to several important issues related to the use of basic principles of land surveying. The project, which is the design of a two-lane rural highway to connect between two arbitrary points, requires students to draw the profile of the proposed highway along with the existing ground level. Areas of all cross-sections are then computed to enable quantity computations between th...

  9. A bi-projection method for Bingham type flows

    OpenAIRE

    Chupin , Laurent; Dubois , Thierry

    2015-01-01

    We propose and study a new numerical scheme to compute the isothermal and unsteady flow of an incompressible viscoplastic Bingham medium.The main difficulty, for both theoretical and numerical approaches, is due to the non-differentiability of the plastic part of stress tensor in regionswhere the rate-of-strain tensor vanishes. This is handled by reformulating the definition of the plastic stress tensor in terms ofa projection.A new time scheme, based on the classical incremental projection m...

  10. COMPUTER GRAPHICAL REPRESENTATION, IN TREBLE ORTHOGONAL PROJECTION, OF A POINT

    Directory of Open Access Journals (Sweden)

    SLONOVSCHI Andrei

    2017-05-01

    Full Text Available In the stages of understanding and study, by students, of descriptive geometry, the treble orthogonal projection of a point, creates problems in the situations in that one or more descriptive coordinates are zero. Starting from these considerations the authors have created an original computer program which offers to the students the possibility to easily understanding of the way in which a point is represented, in draught, in the treble orthogonal projection whatever which are its values of the descriptive coordinates.

  11. Quality Management System at Construction Project: A Questionnaire Survey

    OpenAIRE

    P.P.Mane; J.R.Patil

    2015-01-01

    The best quality, time and cost are the important aspects of successful construction project which fulfills the main goal of construction industry. The quality management has to provide the environment within which related tools, techniques and procedures can be deployed effectively leading to operational success for a construction project. The role of quality management for a construction company is not an isolated activity, but intertwined with all the operational and managerial...

  12. SESAME as a Model Project for Other Regions

    Science.gov (United States)

    Winick, Herman

    2013-03-01

    UNESCO became the umbrella organization for SESAME at its Executive Board 164th session, May 2002. The following comments about SESAME were made by this board: ``a quintessential UNESCO project combining capacity building with vital peace-building through science'' and ``a model project for other regions.'' Now that SESAME is well underway, other regions (e.g.; Africa and Central Asia) should be made aware of this progress, and they should be welcomed to join SESAME as a first step in developing similar projects in their region. Students and scientists from other regions should be encouraged to attend SESAME Users' meeting, schools, workshops, etc. where they can learn about synchrotron radiation sources, beamlines, and science. They should be invited to join SESAME scientists in designing and commissioning accelerators and beamlines, gaining relevant experience for their own projects and helping SESAME in the process. Work supported by DOE Office of Basic Energy Sciences

  13. JPL Project Information Management: A Continuum Back to the Future

    Science.gov (United States)

    Reiz, Julie M.

    2009-01-01

    This slide presentation reviews the practices and architecture that support information management at JPL. This practice has allowed concurrent use and reuse of information by primary and secondary users. The use of this practice is illustrated in the evolution of the Mars Rovers from the Mars Pathfinder to the development of the Mars Science Laboratory. The recognition of the importance of information management during all phases of a project life cycle has resulted in the design of an information system that includes metadata, has reduced the risk of information loss through the use of an in-process appraisal, shaping of project's appreciation for capturing and managing the information on one project for re-use by future projects as a natural outgrowth of the process. This process has also assisted in connection of geographically disbursed partners into a team through sharing information, common tools and collaboration.

  14. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Science.gov (United States)

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  15. Creating a Project-Based Learning Environment to Improve Project Management Skills of Graduate Students

    Science.gov (United States)

    Arantes do Amaral, Joao Alberto; Gonçalves, Paulo; Hess, Aurélio

    2015-01-01

    This article describes the project-based learning environment created to support project management graduate courses. The paper will focus on the learning context and procedures followed for 13 years, in 47 project-based learning MBA courses, involving approximately 1,400 students and 34 community partners.

  16. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    Science.gov (United States)

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  17. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  18. 34 CFR 472.34 - Under what circumstances may a project continue if a partner withdraws?

    Science.gov (United States)

    2010-07-01

    ... project continue if a partner withdraws? (a) A project may continue despite the withdrawal of a partner... the grant agreement by the partner that is withdrawing without a change in the project's scope or... 34 Education 3 2010-07-01 2010-07-01 false Under what circumstances may a project continue if a...

  19. Data management for community research projects: A JGOFS case study

    Science.gov (United States)

    Lowry, Roy K.

    1992-01-01

    Since the mid 1980s, much of the marine science research effort in the United Kingdom has been focused into large scale collaborative projects involving public sector laboratories and university departments, termed Community Research Projects. Two of these, the Biogeochemical Ocean Flux Study (BOFS) and the North Sea Project incorporated large scale data collection to underpin multidisciplinary modeling efforts. The challenge of providing project data sets to support the science was met by a small team within the British Oceanographic Data Centre (BODC) operating as a topical data center. The role of the data center was to both work up the data from the ship's sensors and to combine these data with sample measurements into online databases. The working up of the data was achieved by a unique symbiosis between data center staff and project scientists. The project management, programming and data processing skills of the data center were combined with the oceanographic experience of the project communities to develop a system which has produced quality controlled, calibrated data sets from 49 research cruises in 3.5 years of operation. The data center resources required to achieve this were modest and far outweighed by the time liberated in the scientific community by the removal of the data processing burden. Two online project databases have been assembled containing a very high proportion of the data collected. As these are under the control of BODC their long term availability as part of the UK national data archive is assured. The success of the topical data center model for UK Community Research Project data management has been founded upon the strong working relationships forged between the data center and project scientists. These can only be established by frequent personal contact and hence the relatively small size of the UK has been a critical factor. However, projects covering a larger, even international scale could be successfully supported by a

  20. Increasing the Value of Research: A Comparison of the Literature on Critical Success Factors for Projects, IT Projects and Enterprise Resource Planning Projects

    Directory of Open Access Journals (Sweden)

    Annie Maddison Warren

    2016-11-01

    Full Text Available Since the beginning of modern project management in the 1960s, academic researchers have sought to identify a definitive list of Critical Success Factors (CSFs, the key things that project managers must get right in order to deliver a successful product. With the advent of Information Technology (IT projects and, more recently, projects to deliver Enterprise Resource Planning (ERP systems, attention has turned to identifying definitive lists of CSFs for these more specific project types. The purpose of this paper is to take stock of this research effort by examining how thinking about each type of project has evolved over time, before producing a consolidated list of CSFs for each as a basis for comparison. This process reveals a high degree of similarity, leading to the conclusion that the goal of identifying a generic list of CSFs for project management has been achieved. Therefore, rather than continuing to describe lists of CSFs, researchers could increase the value of their contribution by taking a step forward and focusing on why, despite this apparent knowledge of how to ensure their success, ERP projects continue to fail.

  1. The Cordoba and Wolsung projects: a progress report

    International Nuclear Information System (INIS)

    Brooks, G.L.

    1977-06-01

    The Cordoba and Wolsung projects mark the entry into the international sales arena of the standardized Canadian 600 MWe CANDU-PHW reactor design. The Cordoba station experienced a setback in the early stages when severe inflation in Argentina led to a renegotiation of the contract. However, following this, good progress has been made and the current forecast completion date in 1980 is expected to be achieved. The Wolsung project experienced difficulties early in the project due to site conditions, so that site work commenced some 9-10 months later than originally planned. These difficulties had predictable effects upon the progress of site-related engineering and it is expected that the project completion date will be somewhat delayed

  2. Making project documentation a positive tool for management

    International Nuclear Information System (INIS)

    Shirley, C.G.

    1985-01-01

    Since 1980, Sandia National Laboratory has been designing and constructing Particle Beam Fusion Accelerator II. One managerial challenge of a large project is the problem of handling information. The scope of the PBFA-II projet may be gauged by its cost: $19.4 million for the accelerator itself, $9.5 million for buildings and standard utilities, and $9.6 million for specialized utilities and support systems. The first need of the project at its outset, then, was communication, and this remains a chief function of the CPO. If the nature or magnitude of the risk changes in any one area, the entire project team must know. If a design is changed, persons working on interdependent efforts must know. Some of this communication takes place naturally and informally. But project procedures must guarantee that all important communication is received by all necessary people, that the communication creates accountability, and that management receives timely, accurate reports. To put it another way, important communication requires project documentation. Documentation is both a record of the project and a tool for management

  3. Facebook Used in a German Film Project

    Science.gov (United States)

    Leier, Vera

    2011-01-01

    Looking for a way to make German language study more relevant and to step out of the conventional classroom setting, I introduced Facebook (FB) as a learning platform to my intermediate German students at the University of Canterbury, New Zealand. The students took part in a film competition. A FB group was created and the films were uploaded. The…

  4. Canister Cleaning System Final Design Report - Project A.2.A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    2000-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit

  5. Practical statistics a handbook for business projects

    CERN Document Server

    Buglear, John

    2013-01-01

    Practical Statistics is a hands-on guide to statistics, progressing by complexity of data (univariate, bivariate, multivariate) and analysis (portray, summarise, generalise) in order to give the reader a solid understanding of the fundamentals and how to apply them.

  6. Project accent: graphite irradiated creep in a materials test reactor

    International Nuclear Information System (INIS)

    Brooking, M.

    2014-01-01

    Atkins manages a pioneering programme of irradiation experiments for EDF Energy. One of these projects is Project ACCENT, designed to obtain evidence of a beneficial physical property of the graphite, which may extend the life of the Advanced Gas-cooled Reactors (AGRs). The project team combines the in-house experience of EDF Energy with two supplier organisations (providing the material test reactors and testing facilities) and supporting consultancies (Atkins and an independent technical expert). This paper describes: - Brief summary of the Project; - Discussion of the challenges faced by the Project; and - Conclusion elaborating on the aims of the Project. These challenging experiments use bespoke technology and both un-irradiated (virgin) and irradiated AGR graphite. The results will help to better understand graphite irradiation-induced creep (or stress modified dimensional change) properties and therefore more accurately determine lifetime and safe operating envelopes of the AGRs. The first round of irradiation has been completed, with a second round about to commence. This is a key step to realising the full lifetime ambition for AGRs, demonstrating the relaxation of stresses within the graphite bricks. (authors)

  7. Peanut allergy as a family project

    DEFF Research Database (Denmark)

    Stensgaard, A; Bindslev-Jensen, C; Nielsen, Dorthe

    2017-01-01

    -containing food and the risk of anaphylaxis. Adolescence is a period of increasing separation from parents and has the highest risk of food fatalities. DESIGN: A qualitative interview study taking a phenomenological-hermeneutic approach. METHODS: Data were generated through semi-structured individual interviews...

  8. Towards a taxonomy for project management competences

    NARCIS (Netherlands)

    Dr Ruben Vrijhoef; Steven Nijhuis; J. Kessels

    2016-01-01

    Presented at Conference: IPMA World Conference 2014, At Rotterdam, The Netherlands, Volume: 28 A taxonomy is used for classifying things in general. For the purpose of this paper it is a systematic classification of competences into hierarchical groups where each sublevel constitutes a breakdown of

  9. Performance of a time-projection chamber

    Energy Technology Data Exchange (ETDEWEB)

    Fancher, D; Hilke, H J; Loken, S; Martin, P; Marx, J N; Nygren, D R; Robrish, P; Shapiro, G; Urban, M; Wenzel, W [California Univ., Berkeley (USA). Lawrence Berkeley Lab.

    1979-05-15

    The design and operation of a position sensitive three-dimensional drift chamber with the capability of ionization sampling is reported. This detector allows simultaneous measurements of the momentum and the mass of charged particles. The device is a prototype for a large detector system to be built at the PEP storage ring facility.

  10. Feature Project--A Bookmaking Party.

    Science.gov (United States)

    Drury, Lori; And Others

    1984-01-01

    The teaching activities presented in this article focus on a bookmaking party, which gives children a format in which they can publish and share their activities in a formal way, provides them with books for recording their writing, and involves students, parents, and the community with children's writing. The paper describes the steps for…

  11. Music and Consciousness: A Continuing Project

    Science.gov (United States)

    Clarke, David; Clarke, Eric

    2014-01-01

    If there is a topic on which the humanities might make a distinctive claim, it is that of consciousness--an essential aspect of human being. And within the humanities, music might make its own claims in relation to both consciousness and being human. To investigate this connection, David Clarke and Eric Clarke brought together a wide variety of…

  12. Torres Strait: A channel clearing project

    Energy Technology Data Exchange (ETDEWEB)

    Bankert, Stanley [Department of Applied Science, University of California - Davis (United States)

    1970-05-15

    The Torres Strait is a reef-laden stretch of water lying south of New Guinea and north of the tip of the Cape York Peninsula of northeastern Australia. Because of its location and geologic structure it is particularly hazardous to shipping, and limits passage through the area. It was suggested that nuclear explosives might be used to create a safe shipping channel through the strait, and in this paper that possibility will be explored. While the construction of the Torres Strait Channel appears feasible from both a technical and an economic point of view, a great deal of further research will have to be done in a number of areas. The Channel would be a great economic boost to northwestern Australia and to trade between southeast Asia and Australia, but its effect on the Great Barrier Reef and the people of the region will require serious consideration.

  13. Torres Strait: A channel clearing project

    International Nuclear Information System (INIS)

    Bankert, Stanley

    1970-01-01

    The Torres Strait is a reef-laden stretch of water lying south of New Guinea and north of the tip of the Cape York Peninsula of northeastern Australia. Because of its location and geologic structure it is particularly hazardous to shipping, and limits passage through the area. It was suggested that nuclear explosives might be used to create a safe shipping channel through the strait, and in this paper that possibility will be explored. While the construction of the Torres Strait Channel appears feasible from both a technical and an economic point of view, a great deal of further research will have to be done in a number of areas. The Channel would be a great economic boost to northwestern Australia and to trade between southeast Asia and Australia, but its effect on the Great Barrier Reef and the people of the region will require serious consideration

  14. The Italian project for a hadrontherapy centre

    Energy Technology Data Exchange (ETDEWEB)

    Amaldi, U. [European Organization for Nuclear Research, Geneva (Switzerland)]|[Universita di Milano, Como Seat, Via Lucini 3, 22100 Como (Italy); Arduini, G. [ASP, Villa Gualino, Via Settimio Severo 65, 10133 Torino (Italy); Badano, L. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Cambria, R. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Campi, D. [European Organization for Nuclear Research, Geneva (Switzerland); Gerardi, F. [Fondazione Italiana Ricerca sul Cancro, Via F. Corridoni 7, 20122 Milano (Italy); Gramatica, F. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Leone, R. [Fondazione Italiana Ricerca sul Cancro, Via F. Corridoni 7, 20122 Milano (Italy); Manfredi, G. [Consiglio Nazionale delle Ricerche, ITBA, Via Ampere 56, 20131 Milano (Italy); Nonis, M. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Pullia, M. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Rossi, S. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy); Sangaletti, L. [Fondazione Italiana Ricerca sul Cancro, Via F. Corridoni 7, 20122 Milano (Italy); Silari, M. [Consiglio Nazionale delle Ricerche, ITBA, Via Ampere 56, 20131 Milano (Italy); Tosi, G. [Fondazione per Adroterapia Oncologica, Via Puccini 11, 28100 Novara (Italy)]|[Istituto Europeo di Oncologia, Via Ripamonti 435, 22100 Milano (Italy)

    1995-06-01

    A feasibility study has just been completed for a hospital-based hadrontherapy facility to be built in Italy. This facility aims at the treatment of 1000 patients/year in 5 treatment rooms served by a H{sup -}/light ion synchrotron producing proton beams with energies ranging from 60 to 250 MeV. Generation of neutron beams for boron neutron capture therapy and production of positron emitting radionuclides for PET diagnostics is also foreseen. After an account of the rationale for the use of hadron beams in radiation therapy, a brief overview is given of both the technical components and the facility layout. Two of the treatment rooms will be equipped with a rotating isocentric irradiation unit. The design foresees the possibility of implementing, as a future development, acceleration of fully stripped light ions up to {sup 16}O to energies in the 120-400 MeV/u range. (orig.).

  15. Feasibility Study for a Hopi Utility-Scale Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Kendrick Lomayestewa

    2011-05-31

    The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. Wind resource assessments were conducted at two study sites on Hopi fee simple lands located south of the city of Winslow. Reports from the study were recently completed and have not been compared to any existing historical wind data nor have they been processed under any wind assessment models to determine the output performance and the project economics of turbines at the wind study sites. Ongoing analysis of the wind data and project modeling will determine the feasibility of a tribal utility-scale wind energy generation.

  16. Projective cohomology over a chain complex

    International Nuclear Information System (INIS)

    Abd El-Sattar, A. Dabbour; Salama, T.M.

    1989-07-01

    In the present work we study some topics of spectrums with morphisms and then define a cohomology construction for compact Hausdorff spaces over a chain complex as the coefficient group. It is proved that this construction is δ-functor. (author). 16 refs

  17. Tourism through Travel Club: A Database Project

    Science.gov (United States)

    Pratt, Renée M. E.; Smatt, Cindi T.; Wynn, Donald E.

    2017-01-01

    This applied database exercise utilizes a scenario-based case study to teach the basics of Microsoft Access and database management in introduction to information systems and introduction to database course. The case includes background information on a start-up business (i.e., Carol's Travel Club), description of functional business requirements,…

  18. Witness: The Movie. A Material Development Project.

    Science.gov (United States)

    Conlon, Susan Henderson

    A teaching guide and series of exercises for high-intermediate or advanced English-as-a-Second-Language (ESL) instruction based on the movie "Witness" are presented. The materials are designed primarily to develop English listening and speaking skills and enhance awareness of American culture and the criminal justice system. The teaching…

  19. A partial account of presupposition projection

    NARCIS (Netherlands)

    Beaver, D.; Krahmer, E.J.

    2001-01-01

    In this paper it is shown how a partial semantics for presuppositions can be given which is empirically more satisfactory than its predecessors, and how this semantics can be integrated with a technically sound, compositional grammar in the Montagovian fashion. Additionally, it is argued that the

  20. A Survey of Statistical Capstone Projects

    Science.gov (United States)

    Martonosi, Susan E.; Williams, Talithia D.

    2016-01-01

    In this article, we highlight the advantages of incorporating a statistical capstone experience in the undergraduate curriculum, where students perform an in-depth analysis of real-world data. Capstone experiences develop statistical thinking by allowing students to engage in a consulting-like experience that requires skills outside the scope of…