WorldWideScience

Sample records for schools project power

  1. Wind for Schools: A Wind Powering America Project

    Science.gov (United States)

    US Department of Energy, 2007

    2007-01-01

    The U.S. Department of Energy's (DOE's) Wind Powering America program (based at the National Renewable Energy Laboratory) sponsors the Wind for Schools Project to raise awareness in rural America about the benefits of wind energy while simultaneously educating college seniors regarding wind energy applications. The three primary project goals of…

  2. Wind Powering America's Wind for Schools Project: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.; Newcomb, C.

    2012-06-01

    This report provides an overview of the U.S. Department of Energy, Wind Powering America, Wind for Schools project. It outlines teacher-training activities and curriculum development; discusses the affiliate program that allows school districts and states to replicate the program; and contains reports that provide an update on activities and progress in the 11 states in which the Wind for Schools project operates.

  3. Venezuela's Bolivarian Schools Project.

    Science.gov (United States)

    Diaz, Maria Magnolia Santamaria

    2002-01-01

    Discusses efforts by the Venezuelan government to improve the nation's school infrastructure through the Bolivarian Schools Project administered by the Ministry of Education, Culture and Sport. The project set educational principles which are guiding current school building efforts. (EV)

  4. The Power Plant Mapping Student Project: Bringing Citizen Science to Schools

    Science.gov (United States)

    Tayne, K.; Oda, T.; Gurney, K. R.; O'Keeffe, D.; Petron, G.; Tans, P. P.; Frost, G. J.

    2014-12-01

    An emission inventory (EI) is a conventional tool to quantify and monitor anthropogenic emissions of greenhouse gases and air pollutants into the atmosphere. Gridded EI can visually show geographical patterns of emissions and their changes over time. These patterns, when available, are often determined using location data collected by regional governments, industries, and researchers. Datasets such as Carbon Monitoring and Action (CARMA, www.carma.org) are particularly useful for mapping emissions from large point sources and have been widely used in the EI community. The EI community is aware of potentially significant errors in the geographical locations of point sources, including power plants. The big challenge, however, is to review tens of thousands of power plant locations around the world and correct them where needed. The Power Plant Mapping Student Project (PPMSP) is a platform designed for students in 4th through 12th grade to improve the geographical location of power plants indicated in existing datasets to benefit international EI research. In PPMSP, we use VENTUS, a web-based platform (http://ventus.project.asu.edu/) that invites citizens to contribute power plant location data. Using VENTUS, students view scenes in the vicinity of reported power plant coordinates on Google Maps. Students either verify the location of a power plant or search for it within a designated radius using various indicators, an e-guide, and a power plant photo gallery for assistance. If the power plant cannot be found, students mark the plant as unverified. To assure quality for research use, the project contains multiple checkpoints and levels of review. While participating in meaningful research that directly benefits the EI research community, students are engaged in relevant science curricula designed to meet each grade level's Next Generation Science Standards. Students study energy, climate change, the atmosphere, and geographical information systems. The curricula is

  5. AAEC nuclear power projections

    International Nuclear Information System (INIS)

    Khoe, G.; Fredsall, J.; Scurr, I.; Plotnikoff, W.

    1981-01-01

    The nuclear power capacity projections developed in the May-June period of 1981 by the AAEC are presented. There have been downward revisions for nearly all countries with centrally planned economies. Projections for the year 2000 for the Western World have decreased in aggregate by 4.7% (27Gw) compared to those of 1980. However, this reduction is less than the previous estimate reduction and there appears to have been a stabilisation in the projection

  6. Science in Schools Project

    Science.gov (United States)

    Waugh, Mike

    As part of a program to increase learning and engagement in science classes 124 Victorian schools are trialing a best practice teaching model. The Science in Schools Research Project is a DEET funded project under the Science in Schools Strategy, developed in response to recent research and policy decisions at national and state levels through which literacy, numeracy and science have been identified as key priorities for learning. This major science research project aims to identify, develop and trial best practice in Science teaching and learning. The Department will then be able to provide clear advice to Victoria's schools that can be adopted and sustained to: * enhance teaching and learning of Science * enhance student learning outcomes in Science at all year levels * increase student access to, and participation in Science learning from Prep through to Year 10, and hence in the VCE as well. The nature of the SiS program will be detailed with specific reference to the innovative programs in solar model cars, robotics and environmental science developed at Forest Hill College in response to this project.

  7. Project governance: "Schools of thought"

    Directory of Open Access Journals (Sweden)

    Michiel Christiaan Bekker

    2014-02-01

    Full Text Available The terminology, definition and context of project governance have become a focal subject for research and discussions in project management literature. This article reviews literature on the subject of project governance and categorise the arguments into three schools of thought namely the single-firm school, multi-firm school and large capital school. The single-firm school is concerned with governance principles related to internal organisational projects and practice these principles at a technical level. The multi-firm school address the governance principles concerned with two of more organisations participating on a contractual basis on the same project and focus their governance efforts at the technical and strategic level. The large capital school consider projects as temporary organisations, forming their own entity and establishing governance principles at an institutional level. From these schools of thought it can be concluded that the definition of project governance is dependent on the type of project and hierarchical positioning in the organisation. It is also evident that further research is required to incorporate other governance variables and mechanisms such as transaction theory, social networks and agency theory. The development of project governance frameworks should also consider the complexity of projects spanning across international companies, across country borders and incorporating different value systems, legal systems, corporate governance guidelines, religions and business practices.

  8. Economics of nuclear power projects

    International Nuclear Information System (INIS)

    Chu, I.H.

    1985-01-01

    Nuclear power development in Taiwan was initiated in 1956. Now Taipower has five nuclear units in smooth operation, one unit under construction, two units under planning. The relatively short construction period, low construction costs and twin unit approach had led to the significant economical advantage of our nuclear power generation. Moreover betterment programmes have further improved the availability and reliability factors of our nuclear power plants. In Taipower, the generation cost of nuclear power was even less than half of that of oil-fired thermal power in the past years ever since the nuclear power was commissioned. This made Taipower have more earnings and power rates was even dropped down in March 1983. As Taiwan is short of energy sources and nuclear power is so well-demonstrated nuclear power will be logically the best choice for Taipower future projects

  9. TEP Power Partners Project [Tucson Electric Power

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2014-02-06

    The Arizona Governor’s Office of Energy Policy, in partnership with Tucson Electric Power (TEP), Tendril, and Next Phase Energy (NPE), formed the TEP Power Partners pilot project to demonstrate how residential customers could access their energy usage data and third party applications using data obtained from an Automatic Meter Reading (AMR) network. The project applied for and was awarded a Smart Grid Data Access grant through the U.S. Department of Energy. The project participants’ goal for Phase I is to actively engage 1,700 residential customers to demonstrate sustained participation, reduction in energy usage (kWh) and cost ($), and measure related aspects of customer satisfaction. This Demonstration report presents a summary of the findings, effectiveness, and customer satisfaction with the 15-month TEP Power Partners pilot project. The objective of the program is to provide residential customers with energy consumption data from AMR metering and empower these participants to better manage their electricity use. The pilot recruitment goals included migrating 700 existing customers from the completed Power Partners Demand Response Load Control Project (DRLC), and enrolling 1,000 new participants. Upon conclusion of the project on November 19, 2013; 1,390 Home Area Networks (HANs) were registered; 797 new participants installed a HAN; Survey respondents’ are satisfied with the program and found value with a variety of specific program components; Survey respondents report feeling greater control over their energy usage and report taking energy savings actions in their homes after participating in the program; On average, 43 % of the participants returned to the web portal monthly and 15% returned weekly; and An impact evaluation was completed by Opinion Dynamics and found average participant savings for the treatment period1 to be 2.3% of their household use during this period.2 In total, the program saved 163 MWh in the treatment period of 2013.

  10. The Fulton School Recycling Project.

    Science.gov (United States)

    Lindsay, Jean

    1994-01-01

    Outlines a school recycling project that started as a newspaper collection for library funds and evolved into a community service. Discusses problems that were overcome, strategies for implementation of the project, and related cross-curricular studies and activities. Contains two curriculum mind maps. (LZ)

  11. Atomic power project, Kakrapar, Gujarat

    International Nuclear Information System (INIS)

    Varadarajan, G.

    1992-01-01

    The atomic power project at Kakrapar, comprising of two units of 235 MW each, went critical very recently in September 1992. The work consisted of construction of reactor and turbine buildings, outer and inner containment walls, calandria vault, natural draught cooling tower, etc. Nearly 152,000m 3 of normal aggregate concrete and 3,500m 3 of heavy aggregate concrete were produced and poured. The paper describes salient innovative construction features of the project. Incidentally, the project received a Certificate of Merit in the Excellence in Concrete competition held by the Maharashtra India Chapter of the American Concrete Institute. (author). 7 figs

  12. Supplement analysis, Southpoint power project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-16

    The Calpine Corporation applied to interconnect its proposed power plant with the Western Area Power Administration`s (Western) Parker-Davis project in western Arizona. Western, as a major electric transmission system owner is required by existing policies and regulations, to provide access to its transmission system, when requested by an eligible organization. The proposed interconnection would integrate a major source of new generation into the Parker-Davis system which would allow Calpine to supply its power to the electric wholesale market. Based on this application, Western`s proposed action is to enter into an interconnection agreement with Calpine.

  13. Nuclear power: Financing big projects

    International Nuclear Information System (INIS)

    Raabe, G.

    1992-01-01

    Since the early seventies, the Dresdner Bank AG has been intensively engaged in financing nuclear power plants, e.g., the Muelheim-Kaerlich Nuclear Power Station currently down because of legal technicaltities. The bank has also been involved in other large-scale projects in the energy sector and, in addition, has conceptually accompanied the stages of the nuclear fuel cycle, such as enrichment, fuel element fabrication, and reprocessing. However, for political reasons it has not been possible to carry out these projects and finance them in the Federal Republic. With appropriate modifications, these financial models can also be transferred to international projects; after all, the enrichment sector has always been characterized by trilateral ventures. (orig.) [de

  14. The Ocean State Power Project

    International Nuclear Information System (INIS)

    Makowski, J.

    1987-01-01

    Ocean State Power is an independent partnership in the form of utility companies and private developers who have joined forces to build a gas-fired, combined cycle generating plant in Burrillville, Rhode Island. The initial capacity of the plant is expected to be approximately 250 MW, with a provision to double the size. Unit I will be on-line 2989/2990 with unit II shortly thereafter. The OSP equity group includes TransCanada PipeLines, Easter Utilities Associates, New England Electric System, Newport Electric and J. Makowski Associates. The author describes the project's major features and turns to a brief status report on the contracts and licenses. Ocean State Power came about because of; the rapid growth in demand for capacity in new England; the availability of a long-term supply of natural gas from Canada which has recently revised export policies and the inherent efficiency and reliability of combined cycle power generation

  15. Nuclear Power Project in Thailand

    International Nuclear Information System (INIS)

    Namwong, Ratanachai

    2011-01-01

    The Electricity Generating Authority of Thailand (EGAT), the main power producer in Thailand, was first interested in nuclear power as an electricity option in 1967 when the electricity demand increased considerably for the first time as a result of the economic and industrial growth. Its viability had been assessed several times during the early seventies in relation to the changing factors. Finally in the late 1970s, the proceeding with nuclear option was suspended for a variety of reasons, for instance, public opposition, economic repercussion and the uncovering of the indigenous petroleum resources. Nonetheless, EGAT continued to maintain a core of nuclear expertise. During 1980s, faced with dwindling indigenous fossil fuel resources and restrictions on the use of further hydro as an energy source, EGAT had essentially reconsidered introducing nuclear power plants to provide a significant fraction to the long term future electricity demand. The studies on feasibility, siting and environmental impacts were conducted. However, the project was never implemented due to economics crisis in 1999 and strong opposition by environmentalists and activists groups. The 1986 Chernobyl disaster was an important cause. After a long dormant period, the nuclear power is now reviewed as one part of the solution for future energy supply in the country. Thailand currently relies on natural gas for 70 percent of its electricity, with the rest coming from oil, coal and hydro-power. One-third of the natural gas consumed in Thailand is imported, mainly from neighbouring Myanmar. According to Power Development Plan (PDP) 2007 rev.2, the total installed electricity capacity will increase from 28,530.3 MW in 2007 to 44,281 MW by the end of plan in 2021. Significantly increasing energy demand, concerns over climate change and dependence on overseas supplies of fossil fuels, all turn out in a favor of nuclear power. Under the current PDP (as revised in 2009), two 1,000- megawatt nuclear

  16. Dispatchable Solar Power Plant Project

    Energy Technology Data Exchange (ETDEWEB)

    Price, Henry [Solar Dynamics LLC, Broomfield, CO (United States)

    2018-01-31

    As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines

  17. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  18. 25 CFR 169.27 - Power projects.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Power projects. 169.27 Section 169.27 Indians BUREAU OF... projects. (a) The Act of March 4, 1911 (36 Stat. 1253), as amended by the Act of May 27, 1952 (66 Stat. 95... on any project for the generation of electric power, or the transmission or distribution of...

  19. Schools water efficiency and awareness project

    African Journals Online (AJOL)

    driniev

    2002-04-23

    Apr 23, 2002 ... Schools Water Efficiency Project in February 2003, which supports several of the City's Water Demand ... of automatic flushing urinals (AFUs) alone in schools can save up .... to go back into the bag as the cistern is filling.

  20. Democracy Project: Building Citizenship through Schools | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Citizenship education in schools is a powerful tool to build people's ability to demand recognition of their ... and foster debate on strengthening democracy and citizenship through school education. ... Inclusive growth: Buzzword or innovation?

  1. Solar power generation test project at Sakata Nursery School (Oizumi town, Gunma prefecture); Sakata hoikuen taiyoko hatsuden field test jigyo (Gunmaken Oizumimachi)

    Energy Technology Data Exchange (ETDEWEB)

    Nakamoto, M.

    1997-05-30

    The solar power generation system was installed in fiscal 1996 on a south-facing roof of the Sakata Nursery School`s building. It has a capacity of 10kW, is used as the power source for illumination and air-conditioning, and for driving computers for children and office devices. It will demonstrate applicability and reliability of the solar system, and is expected to promote expanded application of solar systems in the local district. It is a single-crystalline modular system, operated at -20 to 40degC and connected to the low-voltage power transmission line with reverse power flow. It consists of 70 modules, with an array configuration of 5 series, 5 parallel and 2 lines, and 5 series, 4 parallel and 1 line, directed to the due south at the angle of incidence of 20deg. The cell is 103 by 103mm in size, and 96 cells are connected in series. It has a conversion efficiency of 12.7%. The optimum working voltage and current are 45.6V and 3.29A, and the maximum output is 150W. 5 figs., 3 tabs.

  2. Recent experiences with independent power projects

    International Nuclear Information System (INIS)

    Kline, R.H.; Fitzowitch, J.R.; Dalla-Longa, L.

    1999-01-01

    New opportunities are making it possible to develop independent power projects involving partnerships with the electric power industry, and the petroleum and natural gas industry . This paper described those opportunities, the impediments and the risks involved. Mercury Electric Corp. has been involved in power projects at remote gas field and oil field sites where they use of a turbogenerator which runs on flare gas to generate electricity. TransCanada Power's involvement in independent power projects includes the supply and transport of gas and their ability to provide gas fired combined cycle technology. They are involved in a project at Hermiston, Oregon and also in a cogeneration project in Medicine Hat, Alberta. The CanCarb City of Medicine Hat project makes use of waste heat at an industrial facility. 11 figs

  3. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  4. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  5. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  6. The NASA CSTI High Capacity Power Project

    International Nuclear Information System (INIS)

    Winter, J.; Dudenhoefer, J.; Juhasz, A.; Schwarze, G.; Patterson, R.; Ferguson, D.; Schmitz, P.; Vandersande, J.

    1992-01-01

    This paper describes the elements of NASA's CSTI High Capacity Power Project which include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timeliness recently developed

  7. Financing power projects in emerging markets

    International Nuclear Information System (INIS)

    Matsumoto, G.T.

    1996-01-01

    Financing for power generation projects in the developing countries of the world has been provided by the United States Export-Import Bank. The loans provided by its new Project Finance Division, totalling $8.3 billion are described. The future of project financing for the power generation industry should, it is argued, rest not with government financing agencies, but with private sector financial markets. (UK)

  8. Increasing Epilepsy Awareness in Schools: A Seizure Smart Schools Project

    Science.gov (United States)

    Brook, Heather A.; Hiltz, Cynthia M.; Kopplin, Vicki L.; Lindeke, Linda L.

    2015-01-01

    A high prevalence of epilepsy diagnoses and seizure events among students was identified at a large Midwestern school district. In partnership with the Epilepsy Foundation of Minnesota (EFMN), a quality improvement project was conducted to provide education and resources to staff caring for school children with seizures. School nurses (N = 26)…

  9. The Power of Influence: School Nurse Stories.

    Science.gov (United States)

    Mazyck, Donna; Cellucci, Margaret; Largent, Piper

    2015-07-01

    School nurses have influence, and this influence is ignited with school nurse stories. School nurses must tell school staff, leaders, families, and students what they do to help students access their education. School boards, city councils, and legislators need to know the knowledge, skills, and judgment school nurses use daily. NASN understands that school nurses benefit from a "how to" kit and has developed tools to empower school nurses in advocating for their important role in supporting the health and learning of students. This article provides an overview this newly developed electronic toolkit while at the same time reinforcing the power of influence when sharing your stories. © 2015 The Author(s).

  10. Wind power project at Pasni

    International Nuclear Information System (INIS)

    Masud, Jamil

    1998-01-01

    Major power generation capacity additions have recently been achieved in Pakistan as a result of policy initiatives taken in response to widespread power shortages in the eighties. These additions are based mainly on residual fuel oil and natural gas as fuel, resulting in a marked shift in favor of thermal generation and away from the traditionally dominant hydel sources. In recent decades, the supply of electricity to less developed areas has also been accorded high priority in Pakistan, although economic considerations in grid expansion have largely limited an otherwise aggressive rural electrification program to areas easily accessible from the national grid. These factors, coupled with relatively high system losses, have contributed to an unprecedented increase in emissions of greenhouse gases from the power generation industry in the country. An option which merits serious consideration in Pakistan is wind power. Wind power provides an opportunity to reduce dependence on imported fossil fuels and, at the same time, expand the power supply capacity to remote locations where grid expansion is not practical. Preliminary analysis of wind data in selected coastal locations in the Balochistan province indicates that a potential exists for harvesting wind energy using currently available technologies. (author)

  11. Independent power project finance rating criteria

    International Nuclear Information System (INIS)

    Goldsmith, D.; Chew W.; Moulton, C.

    1992-01-01

    Continuing growth of project financing for non-utility generators in the US and abroad has led to growing focus on their credit strength. In general, the financings remain relatively risky and would likely be rated below investment grade, because of various factors: loose power purchase arrangements, poor match between power pricing and fuel costs, aggressive leverage, troubled operating performance. But S and P believes some projects have the credit strength to support investment grade ratings. As traditional financing markets for these projects --- bank lending and private placements with highly specialized institutional investors --- have contracted, project sponsors and developers are considering broader markets. These include institutional investors without specialized focus on power project finance. In these markets, distinctions among projects may lead to greater liquidity and efficiency in developing the pricing and terms under which projects can be financed. This paper reports that ratings are most appropriate for projects seeking permanent financing as they enter commercial operations. They also may be useful for projects which have been operating for some time and for some very strong projects which are raising construction financing. To guide both project developers and investors in project financing, S and P has developed the following approach for rating these types of financings

  12. Portsmouth Atmospheric Science School (PASS) Project

    Science.gov (United States)

    Coleman, Clarence D.; Hathaway, Roger (Technical Monitor)

    2002-01-01

    The Portsmouth Atmospheric Science School Project (PASS) Project was granted a one-year no cost extension for 2001-2002. In year three of the project, objectives and strategies were modified based on the previous year-end evaluation. The recommendations were incorporated and the program was replicated within most of the remaining elementary schools in Portsmouth, Virginia and continued in the four middle schools. The Portsmouth Atmospheric Science School Project is a partnership, which includes Norfolk State University, Cooperating Hampton Roads Organizations for Minorities in Engineering (CHROME), NASA Langley Research Center, and the City of Portsmouth, Virginia Public Schools. The project seeks to strengthen the knowledge of Portsmouth Public Schools students in the field of atmospheric sciences and enhance teacher awareness of hands on activities in the atmospheric sciences. The project specifically seeks to: 1) increase the interest and participation of elementary and middle school students in science and mathematics; 2) strengthen existing science programs; and 3) facilitate greater achievement in core subjects, which are necessary for math, science, and technical careers. Emphasis was placed on providing training activities, materials and resources for elementary students (grades 3 - 5) and middle school students (grades 6 - 8), and teachers through a CHROME club structure. The first year of the project focused on introducing elementary students to concepts and activities in atmospheric science. Year two of the project built on the first year's activities and utilizes advanced topics and activities appropriate for middle school students. During the third year of the project, in addition to the approaches used in years one and two, emphasis was placed on activities that enhanced the Virginia Standards of Learning (SOL).

  13. Wave Power Demonstration Project at Reedsport, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    Mekhiche, Mike [Principal Investigator; Downie, Bruce [Project Manager

    2013-10-21

    Ocean wave power can be a significant source of large‐scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high‐voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon‐based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take‐off subsystem are complete; additionally the power take‐off subsystem has been successfully integrated into the spar.

  14. Wind power project; Proyecto eolico

    Energy Technology Data Exchange (ETDEWEB)

    Borja D, Marco A. [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2003-07-01

    In the international scope, nowadays it is recognized that the wind power generation is an innovating activity of high technology that has been integrated to the electrical systems in order to diversify the power generation and to foment the sustainable development. In several industrialized countries no one discusses any longer if wind power generation is a viable alternative or not, because in the last ten years the facts have widely demonstrated their technical viability and environmental advantage with respect to the conventional generation schemes. [Spanish] En el ambito internacional, hoy en dia se reconoce que la generacion eoloelectrica es una actividad innovadora de alta tecnologia que se ha integrado a los sistemas electricos con el proposito de diversificar la generacion de electricidad y fomentar el desarrollo sustentable. En varios paises industrializados ya no se discute si la generacion eoloelectrica es una alternativa viable o no, pues en los ultimos diez anos los hechos han demostrado ampliamente su viabilidad tecnica y ventaja ambiental respecto a la generacion convencional.

  15. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  16. Project management skills for nuclear power plants

    International Nuclear Information System (INIS)

    Bhatikar, R.J.

    2002-01-01

    Full text: The E and C Division of L and T has executed several power projects in India and abroad and thus possesses the requisite wherewithal to execute nuclear power projects on a fast track basis. To achieve this L and T has set up a separate Strategic Business Unit (SBU) to have a focused attention to the nuclear power industry in the country. All the four important and necessary hallmarks for successful implementation of any project namely (i) engineering capabilities, (ii) sophisticated project management tools, (iii) ability to mobilize resources, and (iv) skilled personnel to execute the project have been adequately addressed. These could be realized either by establishing fruitful collaborations with other specialist Companies and/or creating powerful and multitasking software tools for effective implementation. The execution of nuclear power projects on a fast track basis could be implemented by following the EPC route and by minimizing the number of packages. Details of this scheme for project implementation will be highlighted during the talk

  17. Nuclear power. Volume 2: nuclear power project management

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The following topics are discussed: review of nuclear power plants; licensing procedures; safety analysis; project professional services; quality assurance and project organization; construction, scheduling and operation; construction, scheduling and operation; nuclear fuel handling and fuel management; and plant cost management. 116 references, 115 figures, 33 tables

  18. Assessment and financing of electric power projects

    International Nuclear Information System (INIS)

    Moscote, R.A.

    1976-01-01

    The aim of the appraisal of a project is to examine the economic need which a project is designed to meet, to judge whether the project is likely to meet this need in an efficient way, and to conclude what conditions should be attached to eventual Bank financing. Bank involvement continues throughout the life of the project helping to ensure that each project is carried out at the least possible cost and that it makes the expected contribution to the country's development. This paper gives an idea about the origin, nature and functions of the World Bank Group, describes the criteria used by the Bank in its power project appraisals, discusses the Bank's views on nuclear power, and concludes with a review of past lending and probable future sources of financing of electrical expansion in the less developed countries. (orig./UA) [de

  19. Appraisal and financing of electric power projects

    International Nuclear Information System (INIS)

    Sheehan, R.H.

    1975-01-01

    This paper starts with the origin, nature and functions of the World Bank Group, reviews the past lending, describes the criteria used by the Bank in its power project appraisals, discusses the Bank's views on nuclear power, and concludes with a look at the probable future sources of financing of electrical expansion in the less developed countries. (orig./UA) [de

  20. Democracy Project: Building Citizenship through Schools | CRDI ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    , and ... materials and teachers' training modules on citizenship education. ... and the political class, frail government institutions, high social unrest, corruption, and ... Citizenship education in schools is a powerful tool to build people's ability to ...

  1. An ABC analysis for power generation project

    OpenAIRE

    Batool Hasani; Younos Vakilalroaia

    2013-01-01

    One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC m...

  2. [Administration of the "Healthy School" project].

    Science.gov (United States)

    Bjegović, V; Zivković, M; Marinković, J; Vuković, D; Legetić, B

    1996-01-01

    The term of project management is commonly used to describe the work of a team that is handling a special program. In this type of management, a form of leadership which creates environment, enables fast movement of participants through different work phases achieving the common aims, is used [1-4]. The "Healthy School" Project, launched in almost all European countries, has been taking place in Yugoslavia since the end of 1991 [5]. The project developed within the country designed as a health promotion-education intervention study in primary schools. The network of 13 schools on 11 locations representing typical economic, cultural and social environments, was established to cover the country. Although the proposed methodological approach from WHO was followed [6], the specific situation in the country (economic crisis, break down of Yugoslav Federation, the war and international blockade) distated the particular modification. The management of the Healthy School Project in general, and in Yugoslavia particularly, is based upon project management structure (Scheme 1). The objective of this research was to assess the Healthy School project management in Yugoslavia, by measuring causal, intervening and output variables. In the process of assessing the management in general, three groups of criteria are commonly used: (a) causal (those that influence the course of developments in the Project), (b) intervening (representing the current condition of the internal state of the Project), and (c) output (that reflect the Project achievements). (a) For the purpose of this study the causal criteria were measured by analyzing the overall management strategy and the level of agreement in objectives of the Project itself, the Project Coordinators and main participants in the Project. (b) The intervening criteria used in this assessment were: the time spent on different project activities, the estimate of the severity of the problems in different aspects of project management

  3. Managing the first nuclear power plant project

    International Nuclear Information System (INIS)

    2007-05-01

    Energy is essential for national development. Nearly every aspect of development - from reducing poverty and raising living standards to improving health care, industrial and agricultural productivity - requires reliable access to modern energy resources. States may have different reasons for considering starting a nuclear power project to achieve their national energy needs, such as: lack of available indigenous energy resources, the desire to reduce dependence upon imported energy, the need to increase the diversity of energy resources and/or mitigation of carbon emission increases. The start of a nuclear power plant project involves several complex and interrelated activities with long duration. Experience shows that the time between the initial policy decision by a State to consider nuclear power up to the start of operation of its first nuclear power plant is about 10 to 15 years and that before specific project management can proceed, several key infrastructure issues have to be in place. The proper management of the wide scope of activities to be planned and implemented during this period represents a major challenge for the involved governmental, utility, regulatory, supplier and other supportive organizations. The main focus is to ensure that the project is implemented successfully from a commercial point of view while remaining in accordance with the appropriate engineering and quality requirements, safety standards and security guides. This publication is aimed at providing guidance on the practical management of a first nuclear power project in a country. There are many other issues, related to ensuring that the infrastructure in the country has been prepared adequately to ensure that the project will be able to be completed, that are only briefly addressed in this publication. The construction of the first nuclear power plant is a major undertaking for any country developing a nuclear power programme. Worldwide experience gained in the last 50 years

  4. Nuclear power. Volume 2. Nuclear power project management

    International Nuclear Information System (INIS)

    Pedersen, E.S.

    1978-01-01

    NUCLEAR POWER PLANT DESIGN is intended to be used as a working reference book for management, engineers and designers, and as a graduate-level text for engineering students. The book is designed to combine theory with practical nuclear power engineering and design experience, and to give the reader an up-to-date view of the status of nuclear power and a basic understanding of how nuclear power plants function. Volume 2 contains the following chapters: (1) review of nuclear power plants; (2) licensing procedures; (3) safety analysis; (4) project professional services; (5) quality assurance and project organization; (6) construction, scheduling, and operation; (7) nuclear fuel handling and fuel management; (8) plant cost management; and (9) conclusion

  5. Management of delayed nuclear power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  6. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  7. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    2005-01-01

    The IAEA assists the management of organizations responsible for Nuclear Power Plant Projects with significant delays with respect to the originally scheduled commercial operation. Several Member States have Nuclear Power Plant Projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules shows large variations due to several issues, including financial, economic and public opinion factors. Solving the special difficulties related with a delayed NPP project is problematic and dependent on the particular country situation. However it is not regarded as an isolated national problem but as a significant issue with a number of difficulties shared by several Member States. The IAEA collects information and supports the management of delayed NPP projects by identifying main common issues, gathering available experience and addressing specific needs. On this background the IAEA is in the position to provide unique impartial assistance based upon best international practices. This enables Member States to maintain readiness for resuming the project construction when the conditions permit and to strengthen management's abilities for the completion of the project. The IAEA's service is tailored to the needs and requirements of the requesting organization, implemented on-site by international experts and addresses areas such as project control measures, human resources, updating to technological and regulatory requirements, project data, nuclear safety review, physical protection and nuclear security and preparation to resume project construction and operation

  8. The Chancellor's Model School Project (CMSP)

    Science.gov (United States)

    Lopez, Gil

    1999-01-01

    What does it take to create and implement a 7th to 8th grade middle school program where the great majority of students achieve at high academic levels regardless of their previous elementary school backgrounds? This was the major question that guided the research and development of a 7-year long project effort entitled the Chancellor's Model School Project (CMSP) from September 1991 to August 1998. The CMSP effort conducted largely in two New York City public schools was aimed at creating and testing a prototype 7th and 8th grade model program that was organized and test-implemented in two distinct project phases: Phase I of the CMSP effort was conducted from 1991 to 1995 as a 7th to 8th grade extension of an existing K-6 elementary school, and Phase II was conducted from 1995 to 1998 as a 7th to 8th grade middle school program that became an integral part of a newly established 7-12th grade high school. In Phase I, the CMSP demonstrated that with a highly structured curriculum coupled with strong academic support and increased learning time, students participating in the CMSP were able to develop a strong foundation for rigorous high school coursework within the space of 2 years (at the 7th and 8th grades). Mathematics and Reading test score data during Phase I of the project, clearly indicated that significant academic gains were obtained by almost all students -- at both the high and low ends of the spectrum -- regardless of their previous academic performance in the K-6 elementary school experience. The CMSP effort expanded in Phase II to include a fully operating 7-12 high school model. Achievement gains at the 7th and 8th grade levels in Phase II were tempered by the fact that incoming 7th grade students' academic background at the CMSP High School was significantly lower than students participating in Phase 1. Student performance in Phase II was also affected by the broadening of the CMSP effort from a 7-8th grade program to a fully functioning 7-12 high

  9. Critical success factors for BOT electric power projects in China: Thermal power versus wind power

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, Zhen-Yu. [School of Business Administration, North China Electric Power University, Beijing 102206 (China); Zuo, Jian; Zillante, George [School of Natural and Built Environments, University of South Australia, Adelaide 5001 (Australia); Wang, Xin-Wei [Shandong Nuclear Power Equipment Manufacturing Co. Ltd, Haiyang, Shandong 265118 (China)

    2010-06-15

    Chinese electric power industry has adopted Build-Operate-Transfer (BOT) approach in a number of projects to alleviate the pressure of sole state-owned investment. The Chinese government has taken enormous efforts to create an environment to facilitate the application of BOT approach in electric power projects. Moreover, the growing attention on the sustainability issues puts the traditional major source of electricity - thermal power project under more strict scrutiny. As a result, various renewable energy projects, particularly the wind power projects have involved private sector funds. Both thermal power and wind power projects via BOT approach have met with a varying degree of success. Therefore, it is imperative to understand the factors contributing towards the success of both types of BOT power projects. Using an extensive literature survey, this paper identifies 31 success factors under 5 categories for Chinese BOT electric power projects. This is followed by a questionnaire survey to exam relative significance of these factors. The results reveal the different levels of significance of success factors for BOT thermal power projects versus wind power projects. Finally, survey results were analyzed to explore the underlying construction and distributions among the identified success factors. This study provides a valuable reference for all involved parties that are interested in developing BOT electric power projects in China. (author)

  10. The solar two power tower project

    International Nuclear Information System (INIS)

    Chavez, J.M.; Klimas, P.C.; Laquil, P. de III; Skowronski, M.

    1993-01-01

    A consortium of United States utility concerns led by Southern California Edison Company (SCE) has begun a cooperative project with the U.S. Department of Energy (DOE) and industry to convert the 10-MWe Solar One Tower Pilot Plant to molten nitrate salt technology. Successful operation of the convert plant to be called Solar Two, will reduce the economic risks in building the initial commercial power tower projects and accelerate the commercial acceptance of this promising renewable energy technology. In a molten salt power tower plant, sunlight is concentrated by a field of sun-tracking mirrors, called heliostats, onto a centrally located receiver, atop a tower. Molten salt is heated in the receiver and stored until it is needed to generate steam to power a conventional turbine generator. Joining the SCE and DOE in sponsoring in sponsoring this project are the following organizations: Los Alamos department of Water Power, Idaho Power Company, PacifiCorp, Pacific Gas and Electric Company, Sacramento Municipal Utility District, Arizona Public Service Company, Salt River Project, City of Pasadena, California Energy Commission, Electric Power Research Institute, South Coast Air Quality Commission, Electric Power research Institute, South Coast Air Quality Management District, and Bechtel Corporation. The Solar Two project will convert the Solar One heat transfer system from a water/steam type to molten nitrate salt by replacing the water/steam receiver and oil/rock thermal storage system with a nitrate salt receiver, salt thermal storage, and steam generator. The estimate cost of Solar Two, including 3-year test period, is 48.5 millions. The plant will be on line in early 1995. (authors)

  11. Concentrating Solar Power Projects - Dish/Engine Projects | Concentrating

    Science.gov (United States)

    Solar Power | NREL Dish/Engine Projects Photo of several flat, octagonal panels arranged together to form a dish-shaped structure. The receiver is supported above the panels by an arm-like of the panels. These dish/Stirling units are being tested at Sandia National Laboratories in

  12. The Power of Community Schools

    Science.gov (United States)

    Capers, Natasha; Shah, Shital C.

    2015-01-01

    In this article, Shital Shah, who supports community schools as assistant director for educational issues at the American Federation of Teachers, and Natasha Capers, a coordinator for the New York City Coalition for Educational Justice (CEJ), a parent-led collaborative of unions and community organizations, discuss the community schools movement…

  13. Belene Nuclear Power Plant project status

    International Nuclear Information System (INIS)

    Nikolov

    2008-01-01

    The status of the Belene project with the following main features is described: Reactor type - PWR, Russian Design Plant supplier - ASE, AREVA NP/Siemens Reactor thermal power - 2 x 3012 MW Electric output -2 x 1060 MW Net efficiency - 35 % Capacity factor - 90 % Design Life Time - 60 years

  14. International power projections and capital requirements

    International Nuclear Information System (INIS)

    Ann, H.

    1989-01-01

    This work is related to the international power projections and capital requirements of all kinds of energy and the share of electricity. It is also related to the so-called greenhouse effect carbon dioxide concentration in atmosphere. (A.C.A.S.)

  15. Elementary and middle school science improvement project

    Science.gov (United States)

    Mcguire, Saundra Y.

    1989-01-01

    The Alabama A and M University Elementary and Middle School Science Improvement Project (Project SIP) was instituted to improve the science knowledge of elementary and middle school teachers using the experimental or hands-on approach. Summer workshops were conducted during the summers of 1986, 1987, and 1988 in the areas of biology, chemistry, physics, and electricity, and magnetism. Additionally, a manual containing 43 lessons which included background information, experiments and activities for classroom and home use was provided to each teacher. During the course of the project activities, the teachers interacted with various university faculty members, scientists, and NASA staff. The administrative aspects of the program, the delivery of the services to participating teachers, and the project outcome are addressed.

  16. Financing strategy for Indonesian Nuclear Power Project

    International Nuclear Information System (INIS)

    Subki, I.M.; Arbie, B.; Adiwardojo; Seotrisnanto, A.Y.

    1998-01-01

    In anticipation of the introduction in the early 2000s of a nuclear power plant, the Government of Indonesia (GOI), through the National Atomic Energy Agency (BATAN) , has formulated a Bid Invitation Specification (BIS) in parallel with the completion of the NPP Feasibility Study. This BIS formulation assumed an open international tender for the first unit of the NPP with project financing as a conventional loan. The GOI's recent policy is to minimize government financial support for power development. This paper summarizes a financing strategy for the Indonesian NPP project to make the NPP economically viable, and provides a general discussion on project financing using a conventional approach, Build--Own-Operate (BOO) and a counter-purchase approach. Innovative approaches for financing are still being pursued in order to obtain an optimum solution for investors and owners, to fulfill the Indonesian government's requirements. (author)

  17. Measures to improve nuclear power project management

    International Nuclear Information System (INIS)

    Ma Xinchao

    2012-01-01

    Focusing on correct application of ability level principle in setting organizational structure, the effective management system has been established, and 8 practical management regimes have been developed. Personnel training and management work shall be well done and enhanced. Experience feedback in construction management shall be well done for all systems. Exchange of construction and management techniques shall be actively carried out. All staff shall participate in safety management. KPI system is adopted for assessing stakeholders' project management method, and PDCA cycle is adopted for continued improved. Management level upgrading measures are proposed to ensure the smooth construction of nuclear power project. Setting forth and popularizing management theory can provide reference for and promote the smooth progress of various nuclear power projects. (author)

  18. The trillion dollar power project jackpot

    International Nuclear Information System (INIS)

    Roseman, E.J.

    1994-01-01

    International power needs, if not insatiable, are certainly of a magnitude beyond anything heretofore imagined. The international opportunities for independent power development are huge: Power Plants -- $700 to $800 billion worth of the new facilities will be needed by the year 2000; Transmission and Distribution -- Expansion of services will require an additional $300 to $400 billion; and Repowering and Improving Existing Plants -- The estimate is $40-$60 billion. RCG/Hagler, Bailly tracks the international power project development activities of over a hundred developers, and monitors the emerging private power market in Europe, Asia, and Latin America. On behalf of private clients and multi-lateral institutions, the authors have worked in more than three dozen countries in the past two years. There are far-reaching global implications involved in this massive movement toward independent power projects. New levels of international economic growth depend on it. Far greater energy efficiencies must accompany it. Environmental problems which will arise must be recognized and solved. The results from the trillion dollars that are to be invested will be far-reaching, dramatic, and vastly beneficial

  19. An ABC analysis for power generation project

    Directory of Open Access Journals (Sweden)

    Batool Hasani

    2013-07-01

    Full Text Available One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC method helps reduce some of the unnecessary overhead cost items and increase on some other cost components. This helps increase the relative efficiency of the system by reducing total cost of project.

  20. The Western Primary School 'Quiet Room' Project.

    Science.gov (United States)

    King, Angus; Chantler, Zara

    2002-01-01

    This article describes a "Quiet Room" project for students with social, emotional, and behavioral problems at a British primary school. The Quiet Room was designed to provide a nurturing environment away from the classroom in which a child's emotional needs can be explored on a one-to-one basis. Benefits for children, parents, and…

  1. The NASA Advanced Space Power Systems Project

    Science.gov (United States)

    Mercer, Carolyn R.; Hoberecht, Mark A.; Bennett, William R.; Lvovich, Vadim F.; Bugga, Ratnakumar

    2015-01-01

    The goal of the NASA Advanced Space Power Systems Project is to develop advanced, game changing technologies that will provide future NASA space exploration missions with safe, reliable, light weight and compact power generation and energy storage systems. The development effort is focused on maturing the technologies from a technology readiness level of approximately 23 to approximately 56 as defined in the NASA Procedural Requirement 7123.1B. Currently, the project is working on two critical technology areas: High specific energy batteries, and regenerative fuel cell systems with passive fluid management. Examples of target applications for these technologies are: extending the duration of extravehicular activities (EVA) with high specific energy and energy density batteries; providing reliable, long-life power for rovers with passive fuel cell and regenerative fuel cell systems that enable reduced system complexity. Recent results from the high energy battery and regenerative fuel cell technology development efforts will be presented. The technical approach, the key performance parameters and the technical results achieved to date in each of these new elements will be included. The Advanced Space Power Systems Project is part of the Game Changing Development Program under NASAs Space Technology Mission Directorate.

  2. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  3. Bomber Deployments: A New Power Projection Strategy

    Science.gov (United States)

    2016-08-21

    AIR COMMAND AND STAFF COLLEGE DISTANCE LEARNING AIR UNIVERSITY BOMBER DEPLOYMENTS: A NEW POWER PROJECTION STRATEGY by...operating base (FOB), main operating base ( MOB ) and intermediate staging base (ISB).10 Each type of base requires certain actions to make it suitable for...closure of many main operating bases ( MOB ) overseas and the reluctance of many nations to permit permanent military bases on their soil.”15 This

  4. Past nuclear power project experiences of Turkey

    International Nuclear Information System (INIS)

    Kutukcuoglu, A.

    1994-01-01

    In this paper, developments in the world for utilization of nuclear energy and, in parallel to these developments, works undertaken in Turkey are summarized. Besides this, future prospects in the field of nuclear energy in the world and in Turkey, and our opinion about the action to be taken in our county, in the light of past experiences of nuclear power projects that could not be succeeded, are presented

  5. Powerful Learning Environments: The Critical Link between School and Classroom Cultures.

    Science.gov (United States)

    Finnan, Christine; Schnepel, Katherine C.; Anderson, Lorin W.

    2003-01-01

    Evaluated classrooms within four Accelerated Schools Project (ASP) schools, operationalizing the ASP principles, values, and concepts of a "powerful learning environment" (PLE), examining how similarly PLE was implemented in different classrooms and schools, and analyzing the relation between degree of implementation and differences in…

  6. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  7. Financial analysis of wind power projects

    International Nuclear Information System (INIS)

    Juanico, Luis E.; Bergallo, Juan E.

    1999-01-01

    In this work a financial assessment of the economic competitiveness of wind power projects in Argentina compared with other no CO 2 emission sources, such as nuclear, was developed. Argentina has a market driven electrical grid system, and no greenhouse gas emissions penalty taxes, together with a very low natural gas cost and a sustained nuclear development program. For the financial analysis an average wind velocity source of 8 m/s, on several wind farms (from 2 machines to 60) built with new technology wind generators (750 kilowatts power, 900 dollar/kilowatt cost) operating over 20 years, was considered. The leveled cost obtained is decreasing while the number of machines is increasing, from 0,130 dollar/kilowatt-hour to 0,090 dollar/kilowatts-hour. This poor performance can be partially explained considering the higher interest rates in the argentine financial market (15%) than the ones in developed countries

  8. Power Production Management of Three Gorges Project

    Institute of Scientific and Technical Information of China (English)

    Zhang Cheng

    2010-01-01

    @@ The Three Gorges Hydropower Plant is the one with the largest installed capacity in the world today and has a decisive and important influence upon the security of the national power grids. It has been operated stably and supplied the East China, Central China, South China,Sichuan and Chongqing with clean renewable energy. This paper presents the management of the project's dispatch, operation and maintenance and puts forward new ideas and new methods for the plant management, which may provide valuable references for the operation of oversized hydropower plants.

  9. Success Factors in Wind Power Projects

    International Nuclear Information System (INIS)

    Cabal, H.; Varela, M.; Lago, C.; Saez, R. M.

    2002-01-01

    The Spanish wind energy market has experienced an average annual increase over 60% in recent years. With more than 4.1 GW of power at the end of 2002, this market has became the second in Europe and the third in the world. With the objective of obtaining the origin of this success, an analysis of technical and economic features of selected wind projects has been undertaken to draw the outstanding factors that any new independent promoter/developer should take into account within this market. (Author) 16 refs

  10. Basic infrastructure for a nuclear power project

    International Nuclear Information System (INIS)

    2006-06-01

    There are several stages in the process of introducing nuclear power in a country. These include development of nuclear policies and regulations, feasibility studies, public consultations, technology evaluation, requests for proposals and evaluations, contracts and financing, supply, construction, commissioning, operation and finally decommissioning. This publication addresses the 'basic' infrastructure needs, which are adequate until the issue of the construction license. It is obvious that a fully developed nuclear infrastructure will be required for the further implementation stages of a nuclear power reactor. The officials and experts in each country will undertake the transition from a basic infrastructure to a fully developed infrastructure that covers the stages of construction, commissioning, operation and decommissioning. The publication is directed to provide guidance for assessing the basic infrastructure necessary for: - A host country to consider when engaging in the implementation of nuclear power, and - A supplier country to consider when assessing whether the recipient country is in an acceptable condition to begin the implementation of a nuclear power project. The target users are decision makers, advisers and senior managers in the governmental organizations, utilities, industrial organizations and regulatory bodies in the countries adopting nuclear power programmes or exporting supplies for these programmes. The governmental organizations that may find this publication useful include: Ministries of Economy, Energy, Foreign Affairs, Finance, Mining, Internal Affairs, Academic Institutions, Nuclear Energy Agencies and Environmental Agencies. This publication was produced within the IAEA programme directed to increase the capability of Member States to plan and implement nuclear power programmes and to establish and enhance national nuclear infrastructure. This publication should be used in conjunction with the IAEA Safety Standards Series and other

  11. CAS - CERN Accelerator School: Power Converters

    CERN Document Server

    2015-01-01

    These proceedings collate lectures given at the twenty-eighth specialized course organised by the CERN Accelerator School (CAS). The course was held at the Hotel du Parc, Baden, Switzerland from 7 - 14 May 2014, in collaboration with the Paul Scherrer Institute. Following introductory lectures on accelerators and the requirements on power converters, the course covered components and topologies of the different types of power converters needed for particle accelerators. Issues of design, control and exploitation in a sometimes-hostile environment were addressed. Site visits to ABB and PSI provided an insight into state-of-the-art power converter production and operation, while topical seminars completed the programme.

  12. Concentrating Solar Power Projects - Khi Solar One | Concentrating Solar

    Science.gov (United States)

    Power | NREL Khi Solar One This page provides information on Khi Solar One, a concentrating solar power (CSP) project, with data organized by background, parcipants and power plant configuration . Status Date: February 8, 2016 Project Overview Project Name: Khi Solar One Country: South Africa Location

  13. School Astronomy Club: from Project to Knowledge

    Science.gov (United States)

    Folhas, Alvaro

    2016-04-01

    Prepare a generation of young people for the challenges of the future is a task which forces us to rethink the school, not just for being difficult, but also because students feel that the school has very little to offer, especially something that interests them. Thus, the school is dysfunctional, is ill, and needs prompt treatment. School have to adjust to the new times, and this does not mean changing the old blackboards by advanced interactive whiteboards. The school has to find the way to the students with something that seduce them: the Challenge. The Astronomy Club that I lead in my school is essentially a Project space. Students who voluntarily joined the club, organize themselves according to their interests around projects whose outcome is not defined from the beginning, which requires them to do, undo and redo. Which obliges them to feel the need to ask for help to mathematics or physics to achieve answers, to feel the passion to study with a genuine purpose of learning. Some examples of the work: The younger students are challenged to reproduce the historical astronomical experiments that have opened the doors of knowledge such as the Eratosthenes experiment to determine the perimeter of the Earth (on equinox), or by using congruent triangles, determine the diameter the sun. These students are driven to establish distance scales in the solar system, which, to their astonishment, allows them to clear misconceptions that arise from some pictures of books and allows them to have a scientifically correct idea of the planetary orbit and distance separating the planets of the Solar System. For students from 15 to 18 years, I have to raise the level of the challenges and use the natural tendency of this age bracket to assert making new and exciting things. To this purpose, I am fortunate to have the support of large organizations like NUCLIO, ESA, CERN, and Go-Lab Project, Inspiring Science Education, Open Discovery Space and Global Hands on Universe. Through

  14. Initiating a nuclear power project - client's viewpoint

    International Nuclear Information System (INIS)

    Rieh, C.H.

    1985-01-01

    Based upon our experience in Korea, for any country that wants to effectively introduce nuclear plants, the authors recommend the following preparation for accepting the advanced nuclear technology prior to its implementation: training personnel, organizing domestic industries for the technology transfer, and establishing laws, regulations and licensing procedures related to nuclear development. Technical self-sufficiency in nuclear power plant construction and operation must be achieved step by step under a long term master plan. Localization, or internal self-sufficiency, is enhanced by repetitive construction of the same reactor type using a non-turnkey construction method. The project owner should, most of all, improve his management capability for the success of the project along with economic effectiveness. International cooperation among the developing countries who are introducing or planning to introduce nuclear power plant, is expected to play an important role in resolving unique problems which may commonly exist in their nuclear program. In this regard, Korea is prepared to share its accumulated experiences with other developing countries

  15. Decommissioning project of commercial nuclear power plant

    International Nuclear Information System (INIS)

    Karigome, S.

    2008-01-01

    Decommissioning project of commercial nuclear power plant in Japan was outlined. It is expected that the land, after the decommissioning of commercial nuclear power plants, will serve as sites for new plants. Steps will be taken to reduce the amount of wastes generated and to recycle/reuse them. Wastes with a radioactivity concentration below the 'clearance level' need not be dealt with as radioactive material, and may be handled in the same way as conventional wastes. The Tokai-1 power station, a 166 MWe carbon dioxide cooled reactor which closed down in 1998, is being decommissioned and the first ten years as 'safe storage' to allow radioactivity to decay. Non-reactor grade components such as turbines were already removed, heat exchanger dismantling started and the reactor will be dismantled, the buildings demolished and the site left ready for reuse. All radioactive wastes will be classified as low-level wastes in three categories and will be buried under the ground. The total cost will be 88.5 billion yen -34.7 billion for dismantling and 53.8 billion for waste treatment including the graphite moderator. (T. Tanaka)

  16. Role of participants in nuclear power projects

    International Nuclear Information System (INIS)

    Polliart, A.J.

    1977-01-01

    In this article staffing requirements for nuclear projects (Turnkey Contract) and the owner's staff requirements, project planning, project implementation, and plant construction and commissioning are treated. (HK) [de

  17. Daedalus Project's Light Eagle - Human powered aircraft

    Science.gov (United States)

    1987-01-01

    The Michelob Light Eagle is seen here in flight over Rogers Dry Lake at the NASA Dryden Flight Research Center, Edwards, California. The Light Eagle and Daedalus human powered aircraft were testbeds for flight research conducted at Dryden between January 1987 and March 1988. These unique aircraft were designed and constructed by a group of students, professors, and alumni of the Massachusetts Institute of Technology within the context of the Daedalus project. The construction of the Light Eagle and Daedalus aircraft was funded primarily by the Anheuser Busch and United Technologies Corporations, respectively, with additional support from the Smithsonian Air and Space Museum, MIT, and a number of other sponsors. To celebrate the Greek myth of Daedalus, the man who constructed wings of wax and feathers to escape King Minos, the Daedalus project began with the goal of designing, building and testing a human-powered aircraft that could fly the mythical distance, 115 km. To achieve this goal, three aircraft were constructed. The Light Eagle was the prototype aircraft, weighing 92 pounds. On January 22, 1987, it set a closed course distance record of 59 km, which still stands. Also in January of 1987, the Light Eagle was powered by Lois McCallin to set the straight distance, the distance around a closed circuit, and the duration world records for the female division in human powered vehicles. Following this success, two more aircraft were built, the Daedalus 87 and Daedalus 88. Each aircraft weighed approximately 69 pounds. The Daedalus 88 aircraft was the ship that flew the 199 km from the Iraklion Air Force Base on Crete in the Mediterranean Sea, to the island of Santorini in 3 hours, 54 minutes. In the process, the aircraft set new records in distance and endurance for a human powered aircraft. The specific areas of flight research conducted at Dryden included characterizing the rigid body and flexible dynamics of the Light Eagle, investigating sensors for an

  18. Projective Test Use among School Psychologists: A Survey and Critique

    Science.gov (United States)

    Hojnoski, Robin L.; Morrison, Rhonda; Brown, Melissa; Matthews, William J.

    2006-01-01

    The use of projective techniques by school psychologists has been a point of interest and debate, with a number of survey studies documenting usage. The purpose of this study is to update the status of projective use among school psychologists, with a specific focus on their use in the social emotional assessment of children in schools. In…

  19. Wind power projects and Aboriginal consultation

    Energy Technology Data Exchange (ETDEWEB)

    Isaac, T. [McCarthy Tetrault LLP, Vancouver, BC (Canada)

    2006-07-01

    This presentation outlined some of the legal aspects related to Aboriginal involvement in wind power development consultation processes and disputes. Aboriginal rights are rights held by Aboriginal people that are an element of a practice, custom, or tradition integral to the culture of groups claiming such rights. Wind power developers should understand that Aboriginal rights claims may include fishing; whaling; transportation; and cultural and spiritual activities. Aboriginal title is a subcategory of Aboriginal rights, and is a right to land itself, and an encumbrance on the Crown's underlying title to land. Weak Aboriginal claims where potential infringement by energy developers is minor may only require notice and information. Strong prima facie cases for Aboriginal rights and title where the potential for infringement is of high significance may result in more extensive consultation involving interim solutions; formal Aboriginal participation in decision-making processes; and written responses demonstrating how Aboriginal concerns have been considered. There are a number of circumstances requiring a case-by-case approach, and the Crown may make decisions in the face of Aboriginal disagreement. However, energy developers should ensure that consultation processes are fair and reasonable. Conflicting interests can often be successfully resolved through consultation, and accommodation to Aboriginal rights may include mitigation, avoiding interference, and agreeing to as little infringement as possible. Aboriginal title may attach to private land but only to the Crown's underlying title. The Crown has no duty to consult respecting Aboriginal title on private land because title has already been infringed. In these cases, duty to consult and accommodate may be discharged through other regulatory processes such as environmental impact assessments. It was concluded that wind power project proponents should build a relationship with the Crown, as avoiding

  20. 77 FR 67813 - Sam Rayburn Dam Project Power Rate

    Science.gov (United States)

    2012-11-14

    ... DEPARTMENT OF ENERGY Southwestern Power Administration Sam Rayburn Dam Project Power Rate AGENCY: Southwestern Power Administration, DOE. ACTION: Notice of Rate Order Approving an Extension of Power Rate on an.... James K. McDonald, Assistant Administrator, Southwestern Power Administration, Department of Energy...

  1. Code of Conduct for wind-power projects - Phase 3

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-11-01

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  2. Astronomy Education Project for Guangdong High Schools F. P. Pi ...

    Indian Academy of Sciences (India)

    School of Physics and Electronic Engineering, Guangzhou University, ... an astronomy education project for high school teachers and students was initiated ... ipality, universities and research institutes, professional and amateur astronomical.

  3. Great expectations. Projections of nuclear power around the world

    International Nuclear Information System (INIS)

    McDonald, Alan; Rogner, Hans-Holger; Gritsevskyi, Andrii

    2009-01-01

    In its 2008 edition of Energy, Electricity and Nuclear Power Estimates for the Period to 2030, the International Atomic Energy Agency (IAEA) has again revised its projections for nuclear power upwards. Every year since 1981 the IAEA has published 2 updated projections for the world's nuclear power generating capacity, a low projection and a high projection. The low projection is a down to earth, business-as-usual projection. The high projection takes into account government and corporate announcements about longer-term plans for nuclear investments as well as potential new national policies, e.g., to combat climate change. The results for the 2008 projections are presented. In the low projection, the projected nuclear power capacity in 2030 is 473 GW(e), some 27% higher than today's 372 GW(e). In the high projection, nuclear capacity in 2030 is 748 GW(e), double today's capacity. But while projections for nuclear power's future rose, its share of the world's electricity generation today dropped from 15% in 2006 to 14% in 2007. The main reason is that while total global electricity generation rose 4.8% from 2007 to 2008, nuclear electricity actually dropped slightly. The overall message from the IAEA's 2008 edition of Energy, Electricity and Nuclear Power Estimates for the Period to 2030 is that global electricity use will grow significantly, that nuclear power will have to expand more rapidly than it has done recently in order to maintain its share, and that nuclear power can meet the challenge. (orig.)

  4. The Role of Research in School Project Work and Teacher Development: Results from Project "Schools Ethics Technology."

    Science.gov (United States)

    Wellensiek, Anneliese; Lembens, Anja; Schallies, Michael

    "Schools Ethics Technology" was a German interdisciplinary research project with the Centre of Ethics in the Sciences at the University of Tubingen. The project highlighted the new topic of biotechnology and genetic engineering, involving the formation of active project groups within schools. This study examined teaching activities…

  5. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  6. Financing arrangements for nuclear power projects in developing countries

    International Nuclear Information System (INIS)

    1993-01-01

    This reference book reviews the main features and problems or difficulties involved in the financing of nuclear power projects with special reference to developing countries. It provides basic information and advice to developing countries interested in nuclear power projects as part of their power sector planning. The book outlines the general characteristics of financing a nuclear power project and presents innovative approaches for power generation financing. It discusses the special conditions and requirements of nuclear power projects and their financing complexities. The focus is on the practical issues that need to be dealt with in order to successfully finance these power projects, as well as the constraints faced by most developing countries. Possible ways and means of dealing with these constraints are presented. 58 refs, figs and tabs

  7. Qinshan Phase III (CANDU) nuclear power project quality assurance

    International Nuclear Information System (INIS)

    Wang Lingen; Du Jinxiang

    2001-01-01

    The completion and implementation of quality assurance system of Qinshan Phase III (CANDU) nuclear power project are presented. Some comments and understanding with consideration of the project characteristics are put forward

  8. Technical management of difference in CEPR nuclear power project

    International Nuclear Information System (INIS)

    Guo Ruiting

    2014-01-01

    The Thesis dissertate the application of technical management of difference in CEPR Nuclear Power Project from EPR technical bases, condition of a nuclear power plant site, engineering and procurement, construction, quality management, schedule management and experience feedback aspects. (author)

  9. ERP project implementation and risk management of nuclear power enterprise

    International Nuclear Information System (INIS)

    Wang Fei

    2008-01-01

    According to the characteristic and development trend of nuclear power enterprise informatization, combined with the general ERP implementation experience, the method is proposed to ensure the successful implementation and risk management of ERP project in nuclear power enterprise. (authors)

  10. Critical path analysis in early stage of nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2009-01-01

    The technical program and contract model as well as project management system and preliminary design defined in the early stage of nuclear power project are the key condition impact on the quality, schedule and cost of the nuclear power project. This paper, taking the CPR1000 coastal nuclear power station as an example, analyzes the critical path in the early stage of nuclear power project for five fields, i.e. licensing, design and procurement, site preparation, tender of construction contracts and construction preparation, and organization. (authors)

  11. Financing of nuclear power projects in developing countries

    International Nuclear Information System (INIS)

    1991-06-01

    This document is a summary of the ''Topical Seminar on Financing of Nuclear Power Projects in Developing Countries, held in Jakarta between 4-7 September, 1990. The seminar presentations were divided into the following sessions: Keynote session (3 papers), Perspective of Nuclear and Fossil-fired Generation Costs (9 papers), Assessment of Problems and Constraints for the Financing of Large Power Projects, with particular Attention to Nuclear Power Projects (9 papers), Mechanisms for Financing Nuclear Power Projects in Developing Countries (11 papers). A separate abstract was prepared for each of these papers. Refs, figs, tabs and charts

  12. CERN SUMMER SCHOOL 2015 PROJECT REPORT

    CERN Document Server

    Jin, Zizhuo Tony

    2015-01-01

    The context of this internship is the CERN summer student program for the year 2015. As a member of the CERN summer school, I have been assigned, in addition to the classes I attended in the morning, a scientific project within the BE-ABP-HSC section. This work was done under the directions of Benoit Salvant and Nicolo Biancacci whom I thank greatly for their help, patience and teaching. The project consisted in observing the effects generated by the beam passing through various devices. We focused mainly on the electromagnetic waves generated by beams of particles travelling along two of the accelerator's devices: A wire scanner and the TDI (LHC injection beam stopper). These Simulations are of importance to estimate the effect of the beam onto the surrounding apparatus and ensuring both that the latter doesn't get damaged and that the beam doesn't lose too much energy. All the models and simulations were done using c CST STUDIO SUITE software developed by the c CST company.

  13. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  14. Energy analysis and projecting of power plants

    International Nuclear Information System (INIS)

    Jirlow, K.

    1975-01-01

    Energy analysis aims at a better explanation of energy flow and energy exchange at different production processes. In this report the energy budget is analysed for separate nuclear power plants and for expanding systems of power plants. A mathematical model is developed for linear and exponential expanding of nuclear power. The profitableness for nuclear power plants in Sweden is considered to be good. (K.K.)

  15. Legislation on school governors' power to appoint educators: friend ...

    African Journals Online (AJOL)

    The establishment of school governing bodies represents a significant decentralisation of power in the South African school system. The South African Schools Act (Act 84 of 1996) plays an important role in encouraging the principle of partnership in and mutual responsibility for education. With the institution of school ...

  16. Project Chrysalis: The Evolution of a Community School.

    Science.gov (United States)

    Garrett, K.

    1996-01-01

    Describes the creation and operation of Project Chrysalis, a community, service-learning school transformed from row houses, where children can learn, work, and gain inspiration from artists and social entrepreneurs involved with Houston's Project Row Houses. Personal narratives of two teachers highlight the school's and students' accomplishments…

  17. Project management for the Virginia power spent fuel storage project

    International Nuclear Information System (INIS)

    Smith, M.

    1992-01-01

    Like Duke Power, Virginia Power has been involved in spent fuel storage expansion studies for a long time - possibly a little longer than Duke Power. Virginia Power's initial studies date back to the late 70s and into the early 80s. Large variety of storage techniques are reviewed including reracking and transshipment. Virginia Power also considered construction a new spent fuel pool. This was one of the options that was considered early on since Virginia Power started this process before any dry storage techniques had been proven. Consolidation of spent fuel is something that was also studied. Finally, construction of dry storage facility was determined to be the technology of choice. They looked a large variety of dry storage technologies and eventually selected dry storage in metal casks at Surry. There are many of reasons why a utility may choose one technology over another. In Virginia Power's situation, additional storage was needed at Surry much earlier than at other utilities. Virginia Power was confronted with selecting a storage technique and having to be a leader in that it was the first U.S. utility to implement a dry storage system

  18. Considerations for successful minority investments in independent power projects

    International Nuclear Information System (INIS)

    Bleveans, Lincoln

    1998-01-01

    This article considers the role of lead developers and lead investors, and minority investors in power projects. The risks involved in minority investment without control is examined, and minority investor issues, the 'due diligence' of the minority investor, the need for timely information, and the importance of minority investors to the power project are discussed. (UK)

  19. Experience in independent power production: Two projects that closed

    Energy Technology Data Exchange (ETDEWEB)

    Kappaz, M.H.

    1994-12-31

    K and M Engineering and Consulting Corporation`s experience in independent power production is outlined. The following topics are discussed: the KMR Power Corporation, K and M strengths and strategy, key success factors, project experience, selected projects, and capital structure.

  20. Safe Routes to School Local School Project: A health evaluation at 10 low-income schools

    OpenAIRE

    Cooper, Jill F MSW; McMillan, Tracy MPH, PHD

    2010-01-01

    fe Routes to School National Partnership (Partnership) founded the Local School Project (Project) in 2008 to assist ten schools in lowincome communities to: 1) develop and evaluate a school-based SRTS program, 2) build local capacity to apply for state or federal SRTS funding, and 3) increase safe walking and bicycling to and from the school and in the community. The Centers for Disease Control and Prevention, Kaiser Permanente, and the Robert Wood Johnson Foundation provided funding for the ...

  1. Construction of special structures for nuclear power projects

    International Nuclear Information System (INIS)

    Raghavan, N.

    2003-01-01

    Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)

  2. Purchasing management experience of Haiyang nuclear power project construction period

    International Nuclear Information System (INIS)

    Ma Yuqin

    2013-01-01

    Purchasing is one of the important aspects to ensure the safety and quality of the nuclear power plant. This paper, combining the purchasing peculiarity and purchasing process of Haiyang nuclear power project, summarizes experiences of Haiyang nuclear power project in promoting its purchasing management level in aspects of purchasing method choosing, purchasing plan management, purchasing process optimization, purchasing contract implementation and purchasing surveillance, etc. (author)

  3. Development of human factors engineering guide for nuclear power project

    International Nuclear Information System (INIS)

    Wu Dangshi; Sheng Jufang

    1997-01-01

    'THE PRACTICAL GUIDE FOR APPLICATION OF HUMAN FACTORS ENGINEERING TO NUCLEAR POWER PROJECT (First Draft, in Chinese)', which was developed under a research program sponsored by National Nuclear Safety Administration (NNSA) is described briefly. It is hoped that more conscious, more systematical and more comprehensive application of Human Factors Engineering to the nuclear power projects from the preliminary feasibility studies up to the commercial operation will benefit the safe, efficient and economical operations of nuclear power plants in China

  4. Concentrating Solar Power Projects - Nevada Solar One | Concentrating Solar

    Science.gov (United States)

    Power | NREL Nevada Solar One This page provides information on Nevada Solar One, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. Acciona Energy's Nevada Solar One is the third largest CSP plant in the world and the first plant

  5. PowerMatching City : A unique smart grid project

    NARCIS (Netherlands)

    dr. C.J. Wiekens

    2014-01-01

    In this presentation, the smart grid project 'PowerMatching City' is introduced. PowerMatching City is a living lab demonstration of the future energy system. In PowerMatching City the connected households are equipped with a mix of decentralized energy sources, hybrid heat pumps, smart appliances,

  6. The Sydney playground project: popping the bubblewrap--unleashing the power of play: a cluster randomized controlled trial of a primary school playground-based intervention aiming to increase children's physical activity and social skills.

    Science.gov (United States)

    Bundy, Anita C; Naughton, Geraldine; Tranter, Paul; Wyver, Shirley; Baur, Louise; Schiller, Wendy; Bauman, Adrian; Engelen, Lina; Ragen, Jo; Luckett, Tim; Niehues, Anita; Stewart, Gabrielle; Jessup, Glenda; Brentnall, Jennie

    2011-09-01

    In the Westernised world, numerous children are overweight and have problems with bullying and mental health. One of the underlying causes for all three is postulated to be a decrease in outdoor free play. The aim of the Sydney Playground Project is to demonstrate the effectiveness of two simple interventions aimed to increase children's physical activity and social skills. This study protocol describes the design of a 3-year cluster randomised controlled trial (CRCT), in which schools are the clusters. The study consists of a 13-week intervention and 1 week each of pre-and post-testing. We are recruiting 12 schools (6 control; 6 intervention), with 18 randomly chosen participants aged 5 to 7 years in each school. The two intervention strategies are: (1) Child-based intervention: Unstructured materials with no obvious play value introduced to the playground; and (2) Adult-based intervention: Risk reframing sessions held with parents and teachers with the aim of exploring the benefits of allowing children to engage in activities with uncertain outcomes. The primary outcome of the study, physical activity as measured by accelerometer counts, is assessed at baseline and post-intervention. Additional assessments include social skills and interactions, self-concept, after school time use and anthropometric data. Qualitative data (i.e., transcriptions of audio recordings from the risk reframing sessions and of interviews with selected teacher and parent volunteers) are analysed to understand their perceptions of risk in play. The control schools have recess as usual. In addition to outcome evaluation, regular process evaluation sessions are held to monitor fidelity to the treatment. These simple interventions, which could be adopted in every primary school, have the potential of initiating a self-sustaining cycle of prevention for childhood obesity, bullying and mental ill health. Australian and New Zealand Clinical Trials Registration Number ACTRN12611000089932.

  7. The sydney playground project: popping the bubblewrap - unleashing the power of play: a cluster randomized controlled trial of a primary school playground-based intervention aiming to increase children's physical activity and social skills

    Science.gov (United States)

    2011-01-01

    Background In the Westernised world, numerous children are overweight and have problems with bullying and mental health. One of the underlying causes for all three is postulated to be a decrease in outdoor free play. The aim of the Sydney Playground Project is to demonstrate the effectiveness of two simple interventions aimed to increase children's physical activity and social skills. Methods/Design This study protocol describes the design of a 3-year cluster randomised controlled trial (CRCT), in which schools are the clusters. The study consists of a 13-week intervention and 1 week each of pre-and post-testing. We are recruiting 12 schools (6 control; 6 intervention), with 18 randomly chosen participants aged 5 to 7 years in each school. The two intervention strategies are: (1) Child-based intervention: Unstructured materials with no obvious play value introduced to the playground; and (2) Adult-based intervention: Risk reframing sessions held with parents and teachers with the aim of exploring the benefits of allowing children to engage in activities with uncertain outcomes. The primary outcome of the study, physical activity as measured by accelerometer counts, is assessed at baseline and post-intervention. Additional assessments include social skills and interactions, self-concept, after school time use and anthropometric data. Qualitative data (i.e., transcriptions of audio recordings from the risk reframing sessions and of interviews with selected teacher and parent volunteers) are analysed to understand their perceptions of risk in play. The control schools have recess as usual. In addition to outcome evaluation, regular process evaluation sessions are held to monitor fidelity to the treatment. Discussion These simple interventions, which could be adopted in every primary school, have the potential of initiating a self-sustaining cycle of prevention for childhood obesity, bullying and mental ill health. Trial registration Australian and New Zealand Clinical

  8. The sydney playground project: popping the bubblewrap - unleashing the power of play: a cluster randomized controlled trial of a primary school playground-based intervention aiming to increase children's physical activity and social skills

    Directory of Open Access Journals (Sweden)

    Luckett Tim

    2011-09-01

    Full Text Available Abstract Background In the Westernised world, numerous children are overweight and have problems with bullying and mental health. One of the underlying causes for all three is postulated to be a decrease in outdoor free play. The aim of the Sydney Playground Project is to demonstrate the effectiveness of two simple interventions aimed to increase children's physical activity and social skills. Methods/Design This study protocol describes the design of a 3-year cluster randomised controlled trial (CRCT, in which schools are the clusters. The study consists of a 13-week intervention and 1 week each of pre-and post-testing. We are recruiting 12 schools (6 control; 6 intervention, with 18 randomly chosen participants aged 5 to 7 years in each school. The two intervention strategies are: (1 Child-based intervention: Unstructured materials with no obvious play value introduced to the playground; and (2 Adult-based intervention: Risk reframing sessions held with parents and teachers with the aim of exploring the benefits of allowing children to engage in activities with uncertain outcomes. The primary outcome of the study, physical activity as measured by accelerometer counts, is assessed at baseline and post-intervention. Additional assessments include social skills and interactions, self-concept, after school time use and anthropometric data. Qualitative data (i.e., transcriptions of audio recordings from the risk reframing sessions and of interviews with selected teacher and parent volunteers are analysed to understand their perceptions of risk in play. The control schools have recess as usual. In addition to outcome evaluation, regular process evaluation sessions are held to monitor fidelity to the treatment. Discussion These simple interventions, which could be adopted in every primary school, have the potential of initiating a self-sustaining cycle of prevention for childhood obesity, bullying and mental ill health. Trial registration Australian

  9. Training readers at school: the educational project, the school library and the mediation

    Directory of Open Access Journals (Sweden)

    Rovilson José da Silva

    2015-09-01

    Full Text Available Introduction: Discusses the formation of readers in the first years of elementary school and proposes the integration between the school pedagogical project, teachers, reading practices and the school library. Objective: To analyze the basic assumptions to train readers in school. Methods: Bibliographic research based on a literature review on the subject. Results: Initial elements that may be used to structure readers-training projects at any schools are presented. Conclusion: Training readers at school consists in having procedures and pedagogical actions performed in combination with guided and free usage of the library, borrowing books and time to hear stories and talk about them.

  10. International environmental issues and requirements for new power projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, J.R. [Golder Associates Inc., Gainesville, FL (United States); Maltby, J.H. [Golder Associates Inc., Washington, DC (United States)

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  11. Eco-Schools campaign. The European projects

    International Nuclear Information System (INIS)

    Blanchini, P.; Marino, G.

    1999-01-01

    The Foundation for Environmental Education in Europe (FEEE) was established in 1981; since then it was been actively promoting and delivering education through a series of successful internationals programmes launched in 21 different European nations. The Eco-School Campaign aims to raise students' awareness of environment issues through classroom study, and provide an integrated system for environmental management of schools based on EMAS (with waste, water and energy management as priority areas). As a process of facilitating sustainable developpement at a local level, pupils are encouraged to take an active role in mental impact of the schools. The Eco-Schools Green Flag, awarded to schools with high achievement in their Programme, is a recognised and respected eco-label for environmental education and performance. In Italy the National Eco-Schools operator was asked to set up a ten-schools pilot programme in the region Friuli Venezia Giulia: these are very first national schools that are likely to become 'Eco-Schools'

  12. Promoting the Role of Occupational Therapy in School-Based Collaboration: Outcome Project

    Science.gov (United States)

    Christner, Andrea

    2015-01-01

    This evidence-based project provided a professional development opportunity for educators to enhance the awareness of school-based occupational therapy and promote a collaborative approach when supporting student participation in daily learning tasks. Through asynchronous web-based delivery, participants viewed five narrated PowerPoint…

  13. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  14. Reading and Writing Gains for Maori Students in Mainstream Schools: Effective Partnerships in the Rotorua Home and School Literacy Project.

    Science.gov (United States)

    Glynn, Ted; Berryman, Mere; Glynn, Vin

    The Rotorua Energy Charitable Trust with support from the Ministry of Education funded a home and school literacy project in nine Rotorua primary schools. The project funded each school to train a home-school liaison worker (either a school staff member or a community person) to assist schools in developing a working partnership with the students'…

  15. Concentrating Solar Power Projects - Saguaro Power Plant | Concentrating

    Science.gov (United States)

    States Location: Red Rock, Arizona (Southwest USA) Owner(s): Arizona Public Service (100%) Technology Status: Currently Non-Operational Country: United States City: Red Rock State: Arizona County: Pinal : Organic Rankine Power Cycle Pressure: 323.0 psi Cooling Method: Wet cooling Turbine Efficiency: 20.7

  16. Downplaying model power in IT project work

    DEFF Research Database (Denmark)

    Richter, Anne; Buhl, Henrik

    2004-01-01

    in the research, presented in this article, conducted in a Danish manufacturing company, is how an IT system could be configured to support shopfloor teamwork and enhance the quality of work. The approach is based on participatory design and the concept of "model power". This concept facilitates an understanding...

  17. Structuring and financing power projects in Asia

    International Nuclear Information System (INIS)

    Tay, Paul

    1993-01-01

    The contractual arrangements for the financing and construction of three 660 MW coal fired power plants in Hong Kong are summarized in the form of headings and a diagram. These cover the joint venture arrangement, construction and equipment supply, the operation and offtake contract, coal supply and the financial structure with respect to commercial risk. (UK)

  18. Green Applications for Space Power Project

    Science.gov (United States)

    Robinson, Joel (Principal Investigator)

    2014-01-01

    Spacecraft propulsion and power for many decades has relied on Hydrazine monopropellant technology for auxiliary power units (APU), orbital circularization, orbit raising/lowering and attitude control. However, Hydrazine is toxic and therefore requires special ground handling procedures to ensure launch crew safety. The Swedish Company ECAPS has developed a technology based upon the propellant Ammonium Dinitramide (ADN) that offers higher performance, higher density and reduced ground handling support than Hydrazine. This blended propellant is called LMP-103S. Currently, the United States Air Force (USAF) is pursuing a technology based on Hydroxyl Ammonium Nitrate (HAN, otherwise known as AF-M315E) with industry partners Aerojet and Moog. Based on the advantages offered by these propellants, MSFC should explore powering APU's with these propellants. Due to the availability of space hardware, the principal investigator has found a collection of USAF hardware, that will act as a surrogate, which operates on a Hydrazine derivative. The F-16 fighter jet uses H-70 or 30% diluted Hydrazine for an Emergency Power Unit (EPU) which supplies power to the plane. The PI has acquired two EPU's from planes slated for destruction at the Davis Monthan AFB. This CIF will include a partnership with 2 other NASA Centers who are individually seeking seed funds from their respective organizations: Kennedy Space Center (KSC) and Dryden Flight Research Center (DFRC). KSC is preparing for future flights from their launch pads that will utilize green propellants and desire a low-cost testbed in which to test and calibrate new leak detection sensors. DFRC has access to F-16's which can be used by MSFC & KSC to perform a ground test that demonstrates emergency power supplied to the jet. Neither of the green propellant alternatives have been considered nor evaluated for an APU application. Work has already been accomplished to characterize and obtain the properties of these 2 propellants

  19. Progress Report of the Schools Television Research Project--III

    Science.gov (United States)

    Kemelfield, Graeme

    1969-01-01

    "This concluding article provides the first published account of a series of psychological experiments which are presently being undertaken by the Schools Television Research Project, examining presentation factors in instructional television. (Editor)

  20. [Outcomes evaluation of the school staff health promotion project].

    Science.gov (United States)

    Woynarowska-Sołdan, Magdalena

    This article presents selected outcomes of a 3-year project "Health promotion of school staff in health-promoting schools," as well as the achievements and difficulties in its implementation. The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62-93%) and the physical and social environment of the school (50-92%). Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2):187-200. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  1. Outcomes evaluation of the school staff health promotion project

    Directory of Open Access Journals (Sweden)

    Magdalena Woynarowska-Sołdan

    2016-04-01

    Full Text Available Background: This article presents selected outcomes of a 3-year project “Health promotion of school staff in health-promoting schools,” as well as the achievements and difficulties in its implementation. Material and Methods: The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Results: Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62–93% and the physical and social environment of the school (50–92%. Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. Conclusions: The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2:187–200

  2. Coolidge solar powered irrigation pumping project

    Science.gov (United States)

    Larson, D. L.

    1980-01-01

    A 150 kW solar thermal electric power plant which includes over 2100 square meters of parabolic trough type collectors and an organic Rankine cycle turbine engine was constructed on an irrigated farm. The plant is interconnected with the electrical utility grid. Operation is providing an evaluation of equipment performance and operating and maintenance requirements as well as the desirability of an on farm location.

  3. FGD Franchising Pilot Project of Thermal Power Plants

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At...

  4. Schools water efficiency and awareness project | Wilson | Water SA

    African Journals Online (AJOL)

    The City of Cape Town's Water Demand Management (WDM) department has been involved in school projects for several years, although these have generally been restricted to educational activities during Water Week and school competitions, due mainly to limited resources. Cape Town is a water scarce area, and ...

  5. Financing School Capital Projects in New York State.

    Science.gov (United States)

    Howe, Edward T.

    1990-01-01

    Financing school capital projects in New York State is a responsibility involving both local school districts and the state government. State building aid is provided through an aid ratio and approved expenditure formula. This formula has an equalizing effect among districts by explicitly providing an aid amount inversely proportional to property…

  6. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  7. Power Production Management of Three Gorges Project

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    The Three Gorges Hydropower Plant is the one with the largest installed capacity in the world today and has a decisive and important influence upon the security of the national power grids. It has been operated stably and supplied the East China, Central China, South China, Sichuan and Chongqing with clean renewable energy. This paper presents the management of the project’s dispatch, operation and maintenance and puts forward new ideas and new methods for the plant management, which may provide valuable re...

  8. White Pine Co. Public School System Biomass Conversion Heating Project

    Energy Technology Data Exchange (ETDEWEB)

    Paul Johnson

    2005-11-01

    The White Pine County School District and the Nevada Division of Forestry agreed to develop a pilot project for Nevada using wood chips to heat the David E. Norman Elementary School in Ely, Nevada. Consideration of the project was triggered by a ''Fuels for Schools'' grant that was brought to the attention of the School District. The biomass project that was part of a district-wide energy retrofit, called for the installation of a biomass heating system for the school, while the current fuel oil system remained as back-up. Woody biomass from forest fuel reduction programs will be the main source of fuel. The heating system as planned and completed consists of a biomass steam boiler, storage facility, and an area for unloading and handling equipment necessary to deliver and load fuel. This was the first project of it's kind in Nevada. The purpose of the DOE funded project was to accomplish the following goals: (1) Fuel Efficiency: Purchase and install a fuel efficient biomass heating system. (2) Demonstration Project: Demonstrate the project and gather data to assist with further research and development of biomass technology; and (3) Education: Educate the White Pine community and others about biomass and other non-fossil fuels.

  9. Management of difference in a nuclear power project

    International Nuclear Information System (INIS)

    Guo Ruiting

    2012-01-01

    The Thesis dissertate the application of Management of Difference in a Nuclear Power Project from nuclear safety regulation requirement, selection of a nuclear power plant site, engineering and procurement, construction, operation and maintenance, quality management, schedule management and experience feedback aspects. (author)

  10. Present status and future development of Qinshan nuclear power project

    International Nuclear Information System (INIS)

    Ouyang Yu

    1987-01-01

    Qinshan 300 MWe Nuclear power Project is the first domestically designed and constructed nuclear power plant in China. Here is a brief description of its progress in design work, equipment manufacture and site construction since the first structural concrete in March 1985. In Qinshan area four units of 600 MWe each are planned to be built with collaboration of proper foreign partners. (author)

  11. A Model of Successful School Leadership from the International Successful School Principalship Project

    Directory of Open Access Journals (Sweden)

    David Gurr

    2015-03-01

    Full Text Available The International Successful School Principalship Project (ISSPP has been actively conducting research about the work of successful principals since 2001. Findings from four project books and eight models derived from this project are synthesised into a model of successful school leadership. Building on Gurr, Drysdale and Mulford’s earlier model, the work of school leaders is described as engaging within the school context to influence student and school outcomes through interventions in teaching and learning, school capacity building, and the wider context. The qualities a leader brings to their role, a portfolio approach to using leadership ideas, constructing networks, collaborations and partnerships, and utilising accountability and evaluation for evidence-informed improvement, are important additional elements. The model is applicable to all in leadership roles in schools.

  12. Building a partnership to evaluate school-linked health services: the Cincinnati School Health Demonstration Project.

    Science.gov (United States)

    Rose, Barbara L; Mansour, Mona; Kohake, Kelli

    2005-12-01

    The Cincinnati School Health Demonstration Project was a 3-year collaboration that evaluated school-linked health services in 6 urban elementary (kindergarten to eighth grade) schools. Partners from the Cincinnati Health Department, Cincinnati Public Schools, Cincinnati Children's Hospital Medical Center, and The Health Foundation of Greater Cincinnati wanted to determine if levels of school-linked care made a difference in student quality of life, school connectedness, attendance, emergency department use, and volume of referrals to health care specialists. School nurses, principals and school staff, parents and students, upper-level managers, and health service researchers worked together over a 2.5-year period to learn about and use new technology to collect information on student health, well-being, and outcome measures. Varying levels of school health care intervention models were instituted and evaluated. A standard model of care was compared with 2 models of enhanced care and service. The information collected from students, parents, nurses, and the school system provided a rich database on the health of urban children. School facilities, staffing, and computer technology, relationship building among stakeholders, extensive communication, and high student mobility were factors that influenced success and findings of the project. Funding for district-wide computerization and addition of school health staff was not secured by the end of the demonstration project; however, relationships among the partners endured and paved the way for future collaborations designed to better serve urban school children in Cincinnati.

  13. Environmental impact assessment of Kachchh tidal power project

    International Nuclear Information System (INIS)

    Yadav, Ramanand; Lal, B.B.

    1995-01-01

    The Kachchh tidal power development project is a single-basin, single -effect and ebb generation development by construction of a tidal power barrage of about 3.25 km length across Hansthal creek. The project may disturb the ecosystem of the region. The paper deals in detail the environmental impacts of the project on climate, water velocity, flow and sedimentation pattern, water quality, flora and fauna, fishery, tourism and recreation, wild life, public health and socio-economic conditions. (author). 4 refs., 1 fig., 2 tabs

  14. Intercultural Education in Primary School: A Collaborative Project

    Science.gov (United States)

    Santos, Marta; Araújo e Sá, Maria Helena; Simões, Ana Raquel

    2014-01-01

    In this article, we present and discuss a collaborative project on intercultural education developed by a group of educational partners. The group was made up of 12 people representing different institutions in the community, namely primary schools, cultural and social associations and the local council. The project takes an intercultural approach…

  15. School Building Projects: Managing Insurance and Contracts during Construction

    Science.gov (United States)

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  16. Portland Public Schools Project Chrysalis: Year 2 Evaluation Report.

    Science.gov (United States)

    Mitchell, Stephanie J.; Gabriel, Roy M.; Hahn, Karen J.; Laws, Katherine E.

    In 1994, the Chrysalis Project in Portland Public Schools received funding to prevent or delay the onset of substance abuse among a special target population: high-risk, female adolescents with a history of childhood abuse. Findings from the evaluation of the project's second year of providing assistance to these students are reported here. During…

  17. Making Research Fly in Schools: "Drosophila" as a Powerful Modern Tool for Teaching Biology

    Science.gov (United States)

    Harbottle, Jennifer; Strangward, Patrick; Alnuamaani, Catherine; Lawes, Surita; Patel, Sanjai; Prokop, Andreas

    2016-01-01

    The "droso4schools" project aims to introduce the fruit fly "Drosophila" as a powerful modern teaching tool to convey curriculum-relevant specifications in biology lessons. Flies are easy and cheap to breed and have been at the forefront of biology research for a century, providing unique conceptual understanding of biology and…

  18. The droso4schools project: Long-term scientist-teacher collaborations to promote science communication and education in schools.

    Science.gov (United States)

    Patel, Sanjai; DeMaine, Sophie; Heafield, Joshua; Bianchi, Lynne; Prokop, Andreas

    2017-10-01

    Science communication is becoming an increasingly important part of a scientist's remit, and engaging with primary and secondary schools is one frequently chosen strategy. Here we argue that science communication in schools will be more effective if based on good understanding of the realities of school life, which can be achieved through structured participation and/or collaboration with teachers. For example, the Manchester Fly Facility advocates the use of the fruit fly Drosophila as an important research strategy for the discovery processes in the biomedical sciences. To communicate this concept also in schools, we developed the 'droso4schools' project as a refined form of scientist-teacher collaboration that embraces the expertise and interests of teachers. Within this project, we place university students as teaching assistants in university partner schools to collaborate with teachers and develop biology lessons with adjunct support materials. These lessons teach curriculum-relevant biology topics by making use of the profound conceptual understanding existing in Drosophila combined with parallel examples taken from human biology. By performing easy to implement experiments with flies, we bring living organisms into these lessons, thus endeavouring to further enhance the pupil's learning experience. In this way, we do not talk about flies but rather work with flies as powerful teaching tools to convey mainstream curriculum biology content, whilst also bringing across the relevance of Drosophila research. Through making these lessons freely available online, they have the potential to reach out to teachers and scientists worldwide. In this paper, we share our experiences and strategies to provide ideas for scientists engaging with schools, including the application of the droso4schools project as a paradigm for long-term school engagement which can be adapted also to other areas of science. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All

  19. Employment impacts of CDM projects in China's power sector

    International Nuclear Information System (INIS)

    Wang, Can; Zhang, Weishi; Cai, Wenjia; Xie, Xi

    2013-01-01

    There are continuous debates around the question of whether CDM really contributes to sustainable development (SD) in host countries. Employment impact is an essential indicator of SD. Based on an input-out approach this research builds a quantitative assessment model to evaluate the employment impacts of CDM. Both direct and indirect jobs creation and job losses of CDM projects in the power sector registered by the end of 2011 are calculated by project types and power grids where the project is located. Results of this study show that, although the above mentioned CDM projects causes about 99,000 net direct job losses, they also create about 3.08 million indirect jobs, resulting in the gross employment of CDM to be about 2.98 million. Thereof, hydro projects induce both direct and indirect job losses, which comes to approximately 0.89 million. Solar projects have the most potential since they own the highest indirect jobs created by one GWh generation, about 104 jobs/GWh. - Highlights: • An input–output model was built for assessment of CDM projects' employment impact; • CDM projects create direct and indirect jobs while cause some losses in short. • Significant indirect job gains of CDM projects were found; • Solar projects cause 104 jobs/GWh in average, ranking as the highest contributor

  20. Powering Africa - Projected costs and emissions

    Science.gov (United States)

    Pappis, Ioannis; Taliotis, Constantinos; Howells, Mark; Lindblad, Nicolina

    2017-04-01

    Energy is a fundamental driver of economic growth. Several Sub-Saharan African countries are amongst the least developing economies in the world. A large proportion of the population in the region also lacks access to electricity and other modern energy services, while the individuals who have access are faced with frequent outages. This paper presents scenarios in which universal electricity access across the African continent is achieved by 2030 at a range of electricity consumption levels. A cost-optimization model is used to identify the least-cost generation mix in each country individually so as to meet the projected demand. Several generation options are allowed in each nation, while cross-border electricity trade is enabled at existing and future planned levels, so as to allow exploitation of untapped energy resources in remote regions of the continent. The results indicate that with a higher electricity consumption, CO2 emissions in generation increase considerably. This is due to coal rising as one of the dominant fuels in the supply of centralized electricity, and is of particular importance in climate change negotiations.

  1. Current issues in nuclear power projects decision making

    International Nuclear Information System (INIS)

    Yanev, Y.; Rogner, H.

    2011-01-01

    Concluding Comments: Firm government commitment and support - imminent; New financing approaches/models are emerging, repackaging existing methods and combination of project finance/co-operative mode; Global financial crisis will make financing for investors very challenging, especially for large scale infrastructure projects like NNP –financial regulators to impose tougher rules (Basel III, UK bank levy, US Financial Regulatory Bill, etc; Pure project finance is still challenging for nuclear projects - the availability of finance for new NPPs will depend on the initial government support. This presentation presents a “free market” view on investment in nuclear power projects; If the public sector (governments) wishes to invest in nuclear power as part of its socioeconomic development priorities, finance is not a real obstacle; It becomes an issue in the presence of other equally important development needs and private sector participation is sought

  2. Major projects for the use of high power linacs

    International Nuclear Information System (INIS)

    Prome, M.

    1996-01-01

    A review of the major projects for high power linacs is given. The field covers the projects aiming at the transmutation of nuclear waste or the production of tritium, as well as the production of neutrons for hybrid reactors or basic research with neutron sources. The technologies which arc common to all the projects are discussed. Comments are made on the technical difficulties encountered by all the projects, and the special problems of the pulsed linacs are mentioned. Elements for a comparison of normal conducting linacs versus superconducting ones are given. Finally the technical developments being made in various laboratories are reviewed. (author)

  3. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  4. Know Nukes: A Nuclear Power Issues Curriculum Project.

    Science.gov (United States)

    Butterfield, Charlie; McCandless, Marjorie

    Classroom activities are presented to help teachers introduce general controversial issues and specific issues on nuclear power in their high school science, social studies, and English classes. Objectives are to help students understand the various techniques of persuasion; the relationship between bias, persuasion, and fact; how these techniques…

  5. Economic impact analysis of independent power projects in British Columbia

    International Nuclear Information System (INIS)

    2009-12-01

    Independent power producer (IPP) projects have been active in British Columbia's (BC) regulated electricity market since the late 1980s. The 49 IPP projects developed in the province currently account for approximately 10 per cent of BC's electricity generation, and IPP development continues to expand in nearly every region. This study presented an economic impact analysis of IPP projects in BC. The economic impacts of IPP projects were divided into 2 categories: (1) existing IPP projects, and (2) potential IPP projects. The study showed that the total power potential supplied by BC IPP projects would increase from a current level of 5940 annual GWh to approximately 14,149 GWh. BC could also be generating a further 21,321 GWh of annual output to service demand domestically in addition to exporting to the United States. The value of capital investment in existing IPPs across BC was estimated at $2.8 billion. Capital investment in potential IPPs was estimated at $26.1 billion in 2009 constant dollars. Government revenues generated through the construction phase of potential IPP projects were estimated at $1.6 billion. IPP projects are expected to have a significant impact on First Nations groups, contribute to provincial energy self-sufficiency, and have little to no greenhouse gas (GHG) emissions. 25 refs., 19 tabs., 24 figs.

  6. Examining Thai high school students' developing STEM projects

    Science.gov (United States)

    Teenoi, Kultida; Siripun, Kulpatsorn; Yuenyong, Chokchai

    2018-01-01

    Like others, Thailand education strongly focused on STEM education. This paper aimed to examine existing Thai high school students' integrated knowledge about science, technology, engineering, and mathematics (STEM) in their developing science project. The participants included 49 high school students were studying the subject of individual study (IS) in Khon Kaen wittayayon school, Khon Kaen, Thailand. The IS was provided to gradually enhance students to know how to do science project starting from getting start to do science projects, They enrolled to study the individual study of science project for three year in roll. Methodology was qualitative research. Views of students' integrated knowledge about STEM were interpreted through participant observation, interview, and students' science projects. The first author as participant observation has taught this group of students for 3 years. It found that 16 science projects were developed. Views of students' integrated knowledge about STEM could be categorized into three categories. These included (1) completely indicated integration of knowledge about science, technology, engineering, and mathematics, (2) partial indicated integration of knowledge about science, technology, engineering, and mathematics, and (3) no integration. The findings revealed that majority of science projects could be categorized as completely indicated integration of knowledge about science, technology, engineering, and mathematics. The paper suggested some ideas of enhancing students to applying STEM for developing science projects.

  7. Motives and Power of School Board Members: Implications for School Board-Superintendent Relationships

    Science.gov (United States)

    Mountford, Meredith

    2004-01-01

    The qualitative study presented in this article explores motivations for school board membership and conceptions of power held by school board members. The findings of the study suggest a relationship exists between the way board members define power and the type of motivation board members have for service. The implications of these findings for…

  8. Putting Foucault to Work: Understanding Power in a Rural School

    Science.gov (United States)

    Freie, Carrie; Eppley, Karen

    2014-01-01

    This case study uses the work of Michel Foucault to challenge the normalization of the principal's role and to examine the complex power relations of a rural school and community in the midst of a closure/consolidation and subsequent reopening as a charter school. In so doing, we move beyond analysis of best practices and toward a more theoretical…

  9. High School Principals as Leaders: Styles and Sources of Power

    Science.gov (United States)

    Brinia, Vasiliki; Papantoniou, Eva

    2016-01-01

    Purpose: The purpose of this paper is to present the characteristics of leadership (style adopted, sources of power exercised and factors affecting leadership) of high school principals in Greece. Design/Methodology/Approach: In total, 235 school principals were surveyed using questionnaires. These questionnaires assessed how often they adopted…

  10. Application study of the project management on the nuclear power projects in China Institute of Atomic Energy

    International Nuclear Information System (INIS)

    Ji Cunxing

    2012-01-01

    The article introduced the actions of foreign and domestic nuclear power technical services in China Institute of Atomic Energy, the project management theory is applied to the organization, implementation and control of the nuclear power projects. It is analyzed the quality, schedule , investment etc of nuclear power projects, the improving measures and suggestions are bring forward on the project management organization, quality assurance, reduce cost etc. It will raise its nuclear power project management level in China Institute of Atomic Energy. (author)

  11. Usability: A Teaching and School Service Project

    Science.gov (United States)

    Snyder, Johnny

    2009-01-01

    Your next usability project could be waiting for you in the college library, registration office, or online admissions process that your college or university utilizes in their daily transactions. As an added bonus, these exercises supplement the IS2002 curriculum model, benefit the instructor's institution, build inter-departmental collaboration,…

  12. Comparison of power spectra for tomosynthesis projections and reconstructed images

    International Nuclear Information System (INIS)

    Engstrom, Emma; Reiser, Ingrid; Nishikawa, Robert

    2009-01-01

    Burgess et al. [Med. Phys. 28, 419-437 (2001)] showed that the power spectrum of mammographic breast background follows a power law and that lesion detectability is affected by the power-law exponent β which measures the amount of structure in the background. Following the study of Burgess et al., the authors measured and compared the power-law exponent of mammographic backgrounds in tomosynthesis projections and reconstructed slices to investigate the effect of tomosynthesis imaging on background structure. Our data set consisted of 55 patient cases. For each case, regions of interest (ROIs) were extracted from both projection images and reconstructed slices. The periodogram of each ROI was computed by taking the squared modulus of the Fourier transform of the ROI. The power-law exponent was determined for each periodogram and averaged across all ROIs extracted from all projections or reconstructed slices for each patient data set. For the projections, the mean β averaged across the 55 cases was 3.06 (standard deviation of 0.21), while it was 2.87 (0.24) for the corresponding reconstructions. The difference in β for a given patient between the projection ROIs and the reconstructed ROIs averaged across the 55 cases was 0.194, which was statistically significant (p<0.001). The 95% CI for the difference between the mean value of β for the projections and reconstructions was [0.170, 0.218]. The results are consistent with the observation that the amount of breast structure in the tomosynthesis slice is reduced compared to projection mammography and that this may lead to improved lesion detectability.

  13. Power control for wind turbines in weak grids: Project summary

    DEFF Research Database (Denmark)

    Bindner, H.

    1999-01-01

    . The two case studies (Madeira, Portugal and Co. Donegal, Ireland) revealed that sometimes theleast cost and most attractive option is change in the operating strategy of the power system. This allowed that further wind energy can be integrated at competitive cost in the Madeira power system. In Co....... Donegal the options for pumped storage are goodcombined with good wind resources. Unfortunately the grid is weak. The least cost option for the feeder studied is either grid reinforcement or a power control system based on pumped storage if rather large amounts of wind energy are to be absorbed...... by thepower system. The cost estimates for the two options are in the same range. The current report is a summary of the work done in the project 'Power Control for Wind Turbines in Weak Grids'. The project has been partly funded by EU under contractJOR3-CT95-0067....

  14. Topical and working papers on nuclear power capacity projections

    International Nuclear Information System (INIS)

    As a part of the overall work programme of WG. 1, Sub-Group 1A/2A was formed jointly with WG. 2 and given the responsibility for estimating the growth of nuclear power up to the year 2025 and the associated demands for nuclear fuels, heavy water, enrichment and other fuel cycle services. In carrying out the first part of its task, the estimation of nuclear power capacity growth, sub-Group 1A/2A prepared 6 working papers which contain the following information: A critique of recent world energy demand forecasts; world energy demand and installed capacity to the year 2025; nuclear power growth projections 1977-2000 for developing countries; long range world nuclear power growth projections; INFCE forecasts of nuclear generating capacity 1985-2025

  15. Bats and bat habitats : guidelines for wind power projects

    International Nuclear Information System (INIS)

    2010-03-01

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  16. Bats and bat habitats : guidelines for wind power projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-03-15

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  17. A review of Studsvik's international power ramp test projects

    International Nuclear Information System (INIS)

    Mogard, H.; Kjaer-Pedersen, N.

    1985-11-01

    Since 1975 a series of internationally sponsored fuel irradiation research projects have been and are being conducted at Studsvik, Sweden, under the management of Studsvik Energiteknik AB. The sponsoring parties comprise fuel vendors, nuclear power utilities, national research organizations and, in some cases, safety authorities. Geographically the parties represent organizations in Europe, Japan, and the USA. The main research topic of the Studsvik projects is the Pellet Clad Interaction (PCI) induced Stress Corrosion Cracking (SCC) failure occurrence in LWR fuel under power ramping conditions. The research is conducted in the 50 MW R2 test reactor and the associated hot cell laboratory. Prior to the experiments the test fuel is base irradiated, normally in commercially operated light water reactors. Results have been published for the INTER-RAMP, OVER-RAMP, DEMO-RAMP I, DEMO-RAMP II and SUPER-RAMP projects. The release of the TRANS-RAMP I results is imminent. There are two ongoing projects, i.e. SUPER-RAMP EXTENSION and TRANS-RAMP II. The paper presents an overview of the objectives and main results of the various projects. An attempt is made to summarize the more important observations on PCI failure performance in the perspective of design parameters, fuel burnup levels, power histories, power ramp rates, etc. With 14 refs. (Author)

  18. Power project financing in the People's Republic of China

    International Nuclear Information System (INIS)

    Gomm, R.

    1998-01-01

    The current state of financing and security issues which in the past have constrained the amount of foreign investment and project financing in the electric power market in the Peoples Republic of China (PRC) are reviewed. Past impediments to foreign investment and financing of power projects revolved around the rate of return on investment, the difficulties of obtaining project approvals, conflict of interest issues wherein the Chinese power bureau could act in its interest as a contracted party rather than for the joint venture as an equity investor, and currency convertibility. Recent developments such as the new security law, the new electricity law, and new project financing regulations represent major improvements, but foreign investment and financing is still much less than originally anticipated, the potential of the PRC power market for foreign investments notwithstanding. (For example, in 1997, 13,500 MW of new generation capacity was added to the Chinese grid system. This increased the total installed capacity to 250,000 MW, making China the second largest installed capacity in the world.) Recent trends in the market and the likely future of foreign investment in the PRC are also discussed, the conclusion being that although the size of the IPP and project finance market in China is probably smaller than originally hoped, a sufficient proportion of new generation capacity has been allocated to foreign investors to ensure a steady stream of investment opportunities

  19. Engineering for new-built nuclear power plant projects

    International Nuclear Information System (INIS)

    Gonzalez Lopez, A.

    2012-01-01

    This article reviews the opportunities existing in the market (electrical utilities and reactor vendors) for an engineering company with the profile of Empresarios Agrupados (EA) in new-built nuclear power plant projects. To do this, reference is made to some representative examples of projects in which EA has been participating recently. the article concludes sharing with the reader some lessons learned from this participation. (Author)

  20. PROJECTS EDUCATION RESEARCH: PRACTICAL EXPERIENCED IN A SCHOOL IN / FIELD

    Directory of Open Access Journals (Sweden)

    Rosenilde Nogueira Paniago

    2014-12-01

    Full Text Available This study discusses an investigation done with teachers of a public school, located on countryside, city of Água Boa, Mato Grosso, with a view to looking for new alternatives to the teaching practice on school, by means of using the collaborative realization of projects and researches as pedagogical alternatives. As qualitative approach, the investigation has developed by means of the study of benchmarks, that discuss the research on teaching formation, on teaching practice, education on/of the countryside and, of the projects’ realization of teaching and research with and by teachers. The work enabled to get closer relationship between school and community, to articulate the theoretical knowledge, studied on school, and the life of countryside students, showing the necessity of theoretico-methodological formation with collective engagement of teachers and public politics that propitiate the emergence of conditions to the new practices of teaching on school on/of the countryside by the bias of search.

  1. Austin Children`s Museum ``Go Power`` project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    Go Power, was conceived as an interactive exhibit and related set of activities designed to promote in children and families an understanding and appreciation of energy concepts. Planned in 1990, the project culminated its first phase of activities with colorful, interactive exhibit about the pathways and transformations of energy, on display at the Austin Children`s Museum between February 5th and June 6th, 1993. The project was supported by the US Department of Energy, the National Science Foundation, the Lower Colorado River Authority and various local foundations and businesses. This report describes the process, product and outcomes of this project.

  2. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  3. Cancellation of the Kaiseraugst nuclear power plant project

    International Nuclear Information System (INIS)

    Blocher, C.; Schoenenberger, J.; Stucky, G.

    1988-01-01

    The nuclear power plant project at Kaiseraugst has been worked on for over 20 years. In 1985 the Swiss Parliament decided to license the plant. The cost of the work to date is about 1.2 x10 6 Swiss Franks. Continuation of the project is only sensible if it can be realized within a foreseeable space of time. It is probable that the discussions concerning future energy, environment and safety will continue for a long time. If this is clear that the Kaiseraugst project will not be realized during the next five to ten years for social, civic and political reasons. A continuation of the project is not justifiable. Kernkraftwerk Kaiseraugst AG must be adequately compensated. A motion has been presented to Parliament which charges the Government to negotiate with Kernkraftwerk Kaiseraugst AG for cancellation of the project

  4. Wind Power Project Repowering: History, Economics, and Demand (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.

    2015-01-01

    This presentation summarizes a related NREL technical report and seeks to capture the current status of wind power project repowering in the U.S. and globally, analyze the economic and financial decision drivers that surround repowering, and to quantify the level and timing of demand for new turbine equipment to supply the repowering market.

  5. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  6. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  7. Research notes : solar powered navigational lighting system demonstration project.

    Science.gov (United States)

    2011-04-01

    ODOT will be installing a solar powered navigational lighting system on the AstoriaMegler Bridge as part of a pilot project approved by the Federal Highways Administration (FHWA). The coastal bridge is the connection across the Columbia River on U.S....

  8. Low Friction Cryostat for HTS Power Cable of Dutch Project

    NARCIS (Netherlands)

    Chevtchenko, O.; Zuijderduin, R.; Smit, J.; Willen, D.; Lentge, H.; Thidemann, C.; Traeholt, C.

    2012-01-01

    Particulars of 6 km long HTS AC power cable for Amsterdam project are: a cable has to fit in an annulus of 160 mm, with only two cooling stations at the cable ends [1]. Application of existing solutions for HTS cables would result in excessively high coolant pressure drop in the cable, possibly

  9. Internal structure of reactor building for Madras Atomic Power Project

    International Nuclear Information System (INIS)

    Pandit, D.P.

    1975-01-01

    The structural configuration and analysis of structural elements of the internal structure of reactor building for the Madras Atomic Power Project has been presented. Two methods of analysis of the internal structure, viz. Equivalent Plane Frame and Finite Element Method, are explained and compared with the use of bending moments obtained. (author)

  10. Feasibility study of Pridneprovskaya Thermal Power Plant reconstruction project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With objectives of saving energy and reducing greenhouse gas emission at the Pridneprovskaya power plant in Ukraine, a scrap and build project has been discussed. This project will abolish the unit No.12 among the eight units in the existing coal burning power generation facilities, and install a natural gas burning combined cycle plant comprising of three units each with an output of 100 MW. The new plant facilities will consist of gas turbines, steam turbines, HRSG and auxiliary devices, and an air-cooled synchronous power generator with a capacity of 119 MVA. Use of natural gas as fuel reduces generation of soot, sulfur oxides, nitrogen oxides, and CO. In addition, the hot effluent and waste liquor effluent will decrease from those at the present plant. The required fund will be 30,107 million yen. The energy saving effect of this project is reduction of about 7.5 million tons of crude oil equivalent as a total in 40 years. The greenhouse effect gas will decrease by about 39 million tons as a total in 40 years. The profitability estimation calls for the number of investment recovery year of 16 years, and internal profit rate of 7.32%, wherein the implementation of the project cannot be expected as a project to be carried out by private funds. (NEDO)

  11. Feasibility study on Bobovdol thermal power plant upgrading project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A survey has been made in relation with the improvement project intended of energy conservation, and reduction of global warming gas emission at the Bobovdol thermal power plant located in the suburb of Sofia, the capital of the Republic of Bulgaria. The existing Bobovdol power plant having a total capacity of 630 MW with three generators is a coal burning thermal power plant having been used already for 23 to 27 years, hence over-aged. The survey has discussed an improvement project of scrap-and-build type to make the plant a high-efficiency gas combined cycle power plant using gas turbines. The project calls for building 210-MW gas combined power generation facilities having 70-MW gas turbines, one each in three stages in 2007, 2012 and 2017. As a result of the discussions, the fuel consumption reducing rate was found to reach 37.99%, whereas the cumulative energy saving quantity in 41 years will reach 16.37 million tons of fuel oil equivalent. In addition, the reduction rate of global warming gas emission is 57.75%, and the cumulative reduction quantity in 41 years is 105.18 million tons. (NEDO)

  12. Analysis of debt leveraging in private power projects

    International Nuclear Information System (INIS)

    Kahn, E.P.; Meal, M.; Doerrer, S.; Morse, S.

    1992-08-01

    As private power (non-utility generation) has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital, and that this leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not home by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs

  13. Analysis of debt leveraging in private power projects

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.P. (Lawrence Berkeley Lab., CA (United States)); Meal, M.; Doerrer, S.; Morse, S. (Morse, Richard, Weisenmiller Associates, Inc., Oakland, CA (United States))

    1992-08-01

    As private power has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital. This leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not borne by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs.

  14. Project organization for automating an industrial power plant

    International Nuclear Information System (INIS)

    Williams, D.R.; McCowen, R.R.

    1988-01-01

    This paper reports on the controls for three boilers and three turbine generators at the power plant at the John Deere Waterloo Works that have been retrofit with a microprocessor based monitoring, control, and optimization system. The factors driving the project in the 15 mW, 500,000 lb/hr, 35 year old plant were reduced electricity costs due to peak shaving, energy conservation, labor savings, reduced maintenance costs and improved reliability. A turnkey design/build arrangement was sought after a preliminary study indicated an attractive return on investment Control system vendors and design/build contractors were evaluated using a group decision making method. A design/build contractor was chosen to do an in-depth study and write specifications for the control system were negotiated with the contractor The project was managed by the Power Plant and Energy Management Department, rather than by the staff department normally responsible for capital projects

  15. Schooling Teachers: Professionalism or Disciplinary Power?

    Science.gov (United States)

    Bourke, Terri; Lidstone, John; Ryan, Mary

    2015-01-01

    Since public schooling was introduced in the nineteenth century, teachers in many western countries have endeavoured to achieve professional recognition. For a short period in the latter part of the twentieth century, professionalism was seen as a discourse of resistance or the "enemy" of economic rationalism and performativity. However,…

  16. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  17. Solar Wind Monitor--A School Geophysics Project

    Science.gov (United States)

    Robinson, Ian

    2018-01-01

    Described is an established geophysics project to construct a solar wind monitor based on a nT resolution fluxgate magnetometer. Low-cost and appropriate from school to university level it incorporates elements of astrophysics, geophysics, electronics, programming, computer networking and signal processing. The system monitors the earth's field in…

  18. Application of Markovian model to school enrolment projection ...

    African Journals Online (AJOL)

    Application of Markovian model to school enrolment projection process. VU Ekhosuehi, AA Osagiede. Abstract. No Abstract. Global Journal of Mathematical Sciences Vol. 5(1) 2006: 9-16. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT.

  19. Effect of project work on secondary school students science process ...

    African Journals Online (AJOL)

    The study investigated the effect of students' project work on secondary school science process skills acquisition in Biology. The study was carried out in Owerri North Local Government Area of Imo State. Three research questions guided the study and three null hypotheses were postulated and tested at 0.05 level of ...

  20. Health. Nevada Competency-Based Adult High School Diploma Project.

    Science.gov (United States)

    Nevada Univ., Las Vegas. Coll. of Education.

    This document is one of ten curriculum guides developed by the Nevada Competency-Based Adult High School Diploma (CBAHSD) Project. This curriculum guide on health is divided into ten topics. The topics included are Nutrition, Reproduction, Menstruation, Contraception, Alcohol Abuse, Tobacco, Immunization, Disease, Accident Prevention, and…

  1. Sarah J. Hale High School-Project SABER.

    Science.gov (United States)

    Rosenblatt, Harold

    Project SABER, which operated in Sarah J. Hale High School in South Brooklyn, New York, consisted of bilingual instructional and supportive services to 9th and 10th grade Spanish language students. Students received bilingual instruction in social studies, science, math, and Spanish. All the SABER students received English as a second language…

  2. Music, Synergies and Interculturality: "MUSSI at School" Project

    Science.gov (United States)

    Corte-Real, Maria De Sao Jose

    2008-01-01

    MUSSI is the name of a she-cat from an imaginary story invented and told by children from two elementary schools through different performing modalities. It is also the name of a pilot project of Applied Ethnomusicology funded by a major Portuguese Company, SONAE Sierra, through the local Loures Shopping Centre, which paid for the musical…

  3. The Roland Maze Project - school-based extensive air shower network

    International Nuclear Information System (INIS)

    Feder, J.; Jedrzejczak, K.; Karczmarczyk, J.; Lewandowski, R.; Swarzynski, J.; Szabelska, B.; Szabelski, J.; Wibig, T.

    2006-01-01

    We plan to construct the large area network of extensive air shower detectors placed on the roofs of high school buildings in the city of Lodz. Detection points will be connected by INTERNET to the central server and their work will be synchronized by GPS. The main scientific goal of the project are studies of ultra high energy cosmic rays. Using existing town infrastructure (INTERNET, power supply, etc.) will significantly reduce the cost of the experiment. Engaging high school students in the research program should significantly increase their knowledge of science and modern technologies, and can be a very efficient way of science popularisation. We performed simulations of the projected network capabilities of registering Extensive Air Showers and reconstructing energies of primary particles. Results of the simulations and the current status of project realisation will be presented

  4. Experience of international projects implementation at Leningrad Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Zavialov, L.A. [Leningrad Nuclear Power Plant ' Rosenergoatom' , Leningrad Region, 188540, Sosnovy Bor (Russian Federation)

    2008-07-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  5. Experience of international projects implementation at Leningrad Nuclear Power Plant

    International Nuclear Information System (INIS)

    Zavialov, L.A.

    2008-01-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  6. Data base on nuclear power plant dose reduction research projects

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated.

  7. Data base on nuclear power plant dose reduction research projects

    International Nuclear Information System (INIS)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated

  8. Space technology and robotics in school projects

    Science.gov (United States)

    Villias, Georgios

    2016-04-01

    Space-related educational activities is a very inspiring and attractive way to involve students into science courses, present them the variety of STEM careers that they can follow, while giving them at the same time the opportunity to develop various practical and communication skills necessary for their future professional development. As part of a large scale extracurricular course in Space Science, Space Technology and Robotics that has been introduced in our school, our students, divided in smaller groups of 3-4 students in each, try to understand the challenges that current and future space exploration is facing. Following a mixture of an inquiry-based learning methodology and hands-on practical activities related with constructions and experiments, students get a glimpse of the pre-mentioned fields. Our main goal is to gain practical knowledge and inspiration from the exciting field of Space, to attain an adequate level of team spirit and effective cooperation, while developing technical and research data-mining skills. We use the following two approaches: 1. Constructive (Technical) approach Designing and constructing various customized robotic machines, that will simulate the future space exploration vehicles and satellites needed to study the atmosphere, surface and subsurface of planets, moons or other planetary bodies of our solar system that have shown some promising indications for the existence of life, taking seriously into account their special characteristics and known existing conditions (like Mars, Titan, Europa & Enceladus). The STEM tools we use are the following: - LEGO Mindstorms: to construct rovers for surface exploration. - Hydrobots: an MIT's SeaPerch program for the construction of submarine semi-autonomous robots. - CanSats: Arduino-based microsatellites able to receive, record & transmit data. - Space balloons: appropriate for high altitude atmospheric measurements & photography. 2. Scientific approach Conducting interesting physics

  9. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    Energy Technology Data Exchange (ETDEWEB)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage

  10. Economical aspects of a nuclear power plant project

    International Nuclear Information System (INIS)

    Meldonian, N.L.; Santos, E.M. dos

    1992-01-01

    This work describes different aspects and parameters that should be regarded as guidelines for economic evaluation of small and medium power plant projects. The main objective of an economic evaluation is to establish the plant's unitary cost and its economic figure of merit. To achieve that, a number of studies must be undertaken to compare the global competitiveness of a nuclear power plant with other energetic alternatives. These studies involve macro economy, energy generation, electricity transmission and global feasibility of the enterprise. It is concluded that the economic evaluation of a nuclear power plant should be considered as the culmination of a long process of planning at a national level. The main reasons are the investments involved, the technological developments required and political implications of the utilization of nuclear power energy. (author)

  11. Performance Analysis of XCPC Powered Solar Cooling Demonstration Project

    Science.gov (United States)

    Widyolar, Bennett K.

    A solar thermal cooling system using novel non-tracking External Compound Parabolic Concentrators (XCPC) has been built at the University of California, Merced and operated for two cooling seasons. Its performance in providing power for space cooling has been analyzed. This solar cooling system is comprised of 53.3 m2 of XCPC trough collectors which are used to power a 23 kW double effect (LiBr) absorption chiller. This is the first system that combines both XCPC and absorption chilling technologies. Performance of the system was measured in both sunny and cloudy conditions, with both clean and dirty collectors. It was found that these collectors are well suited at providing thermal power to drive absorption cooling systems and that both the coinciding of available thermal power with cooling demand and the simplicity of the XCPC collectors compared to other solar thermal collectors makes them a highly attractive candidate for cooling projects.

  12. Information management for nuclear power stations: project description

    International Nuclear Information System (INIS)

    Halpin, D.W.

    1978-03-01

    A study of the information management structure required to support nuclear power plant construction was performed by a joint university-industry group under the sponsorship of the Department of Energy (DOE), formerly the Energy Research and Development Administration (ERDA). The purpose of this study was (1) to study methods for the control of information during the construction and start-up of nuclear power plants, and (2) identify those data elements intrinsic to nuclear power plants which must be maintained in a structured format for quick access and retrieval. Maintenance of the massive amount of data needed for control of a nuclear project during design, procurement, construction, start-up/testing, and operational phases requires a structuring which allows immediate update and retrieval based on a wide variety of access criteria. The objective of the research described has been to identify design concepts which support the development of an information control system responsive to these requirements. A conceptual design of a Management Information Data Base System which can meet the project control and information exchange needs of today's large nuclear power plant construction projects has been completed and an approach recommended for development and implementation of a complete operational system

  13. Papers of Scientific Conference Summer School of Nuclear Power

    International Nuclear Information System (INIS)

    2001-01-01

    Despite of the present negative approaches of societies to nuclear power it will be in future one of mine sources of energy in world, also in Poland. Limited resources of effective organic fuels such as petroleum and gas, political and social instability in the regions of oil and gas source and requirements - especially in Europe - of environment protection will prefer nuclear sources of energy. In this situation there is a necessary to give information to society about this source of energy: about advantages and threats resulting from uses of nuclear power, about directions and perspectives of development of nuclear sources of energy. For this purpose the Summer School of Nuclear Power was organized. it should be give the knowledge in the field of present status and perspective of nuclear power, the role of nuclear power in the fuel and energy balance, the radiological impact of nuclear facilities on environment and problems of radioactive waste and spent fuel management. Presented lectures are intended for power workers, workers of scientific institutes, workers and students of colleges, ecologists, specialists of environment protection and for teachers of middle schools should bring near to environment present image and perspectives of nuclear sources of energy development and their utilizations. Presented lectures embrace following problems: resources of power raw materials; problems of economics of nuclear power; ecological aspects of energy production; present state of nuclear power facilities design; development perspective of nuclear power plants; nuclear safety and radiological protection; management of spent fuel and radioactive waste. (author)

  14. Cash flow forecasting model for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Guo Jilin

    2002-01-01

    Cash flow forecasting is very important for owners and contractors of nuclear power projects to arrange the capital and to decrease the capital cost. The factors related to contractor cash flow forecasting are analyzed and a cash flow forecasting model is presented which is suitable for both contractors and owners. The model is efficiently solved using a cost-schedule data integration scheme described. A program is developed based on the model and verified with real project data. The result indicates that the model is efficient and effective

  15. Simulation-based valuation of project finance investments. Crucial aspects of power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    Pietz, Matthaeus

    2010-12-15

    The liberalization of electricity markets transformed a regulated and stable market to a market with former unknown price volatility. This results in a high uncertainty which is mainly due to the, from an economic point of view, lack of storability of the commodity electricity. Thus investments in power plants are highly risky. This dissertation analyzes crucial aspects within the valuation of a power plant financed via project finance, a popular financing method for projects with high capital requirements. Starting with the development of a valuation model based on stochastic modelling of the future cash flows the focus of the analysis is on the impact of model complexity and electricity prices. (orig.)

  16. Power issues at school; Energie macht Schule

    Energy Technology Data Exchange (ETDEWEB)

    Heup, Juergen

    2011-09-15

    Energy and power are not only current issues in politics and society but also subjects for the classroom. In these time of short budgets, energy consultants are able to offer free teaching materials. However, this is a controversial issue as they may take the opportunity to advertise themselves.

  17. High power RF systems for the BNL ERL project

    Energy Technology Data Exchange (ETDEWEB)

    Zaltsman, A.; Lambiase, R.

    2011-03-28

    The Energy Recovery Linac (ERL) project, now under construction at Brookhaven National Laboratory, requires two high power RF systems. The first RF system is for the 703.75 MHz superconducting electron gun. The RF power from this system is used to drive nearly half an Ampere of beam current to 2 MeV. There is no provision to recover any of this energy so the minimum amplifier power is 1 MW. It consists of 1 MW CW klystron, transmitter and power supplies, 1 MW circulator, 1 MW dummy load and a two-way power splitter. The second RF system is for the 703.75 MHz superconducting cavity. The system accelerates the beam to 54.7 MeV and recovers this energy. It will provide up to 50 kW of CW RF power to the cavity. It consists of 50 kW transmitter, circulator, and dummy load. This paper describes the two high power RF systems and presents the test data for both.

  18. A Renewably Powered Hydrogen Generation and Fueling Station Community Project

    Science.gov (United States)

    Lyons, Valerie J.; Sekura, Linda S.; Prokopius, Paul; Theirl, Susan

    2009-01-01

    The proposed project goal is to encourage the use of renewable energy and clean fuel technologies for transportation and other applications while generating economic development. This can be done by creating an incubator for collaborators, and creating a manufacturing hub for the energy economy of the future by training both white- and blue-collar workers for the new energy economy. Hydrogen electrolyzer fueling stations could be mass-produced, shipped and installed in collaboration with renewable energy power stations, or installed connected to the grid with renewable power added later.

  19. Relations of power in public schools: a case study

    Directory of Open Access Journals (Sweden)

    Maria Custódia Jorge Rocha

    2014-04-01

    Full Text Available In this paper, based on a few authors who see power as a substantive element – instituted power – and others who consider it as an action verb – instituting power (ROCHA, 2007 –, highlighting some types of power relevant in sociological and organizational research on schools, we present empirical data and institutional discourses, enabled by a case study of qualitative nature. Thus, we can say that relations of power in schools both allow the strengthening of hierarchical and asymmetrical relations of power that exist between institutional players and enable the creation of new “circles of power” that can be promptly activated or can be object of a modernization process held in a more or less generalized manner. This may be reinforced and introduced to players/students, our main target of study, as the most legitimate object, superseding all others but not canceling them. The key objective is to present school organization as a highly complex environment, especially when considered in the light of the multiple and cumulative relations of power that emerge and are materialized.

  20. Power demand operation - environment and potential. Proposals for main project

    International Nuclear Information System (INIS)

    Wathne, M.

    1995-01-01

    This report discusses proposals for a main project on environmental and other problems arising when hydroelectric power stations supply energy at gigawatt levels. The project aims in particular to identify environmental problems where too little is known today for proper planning of this type of operation. The proposals emphasize the consequences which cannot be adequately analysed in terms of current techniques. These techniques presuppose steady state conditions. One proposal concerns market terms for power sales. Other proposals deal with hydrological data and uncertainty, capacity of watercourses, ice and temperature, aquatic eco-systems, erosion, supersaturation of water with air, flooding and dam breaks, impact on climate, inflow of fresh water in fjords and impact on algae. 33 refs., 4 tabs

  1. Backgrounder : 1998 historic resources overview assessment, Churchill River power project

    International Nuclear Information System (INIS)

    1999-01-01

    A survey was conducted to gather information regarding the history of land-use of the Innu Nation of Labrador. The survey was made possible through research into land use and documentary sources plus the analysis of geomorphologic features and air photos. The areas of the survey included portions of the Strait of Belle Isle, Churchill Valley, proposed transmission routes of the Churchill Power Project, and survey lines at Atikonak Lake. Over 65 historical and traditional land-use sites were recorded, including two major Hudson Bay Company fur-trading posts in the Churchill Valley. This survey will be important in helping to ensure that important sites are not destroyed as a result of the proposed Churchill Power Project

  2. Point Lepreau nuclear project unlocks power future of New Brunswick

    Energy Technology Data Exchange (ETDEWEB)

    Burgess, E J [New Brunswick Electric Power Commission, Fredericton (Canada)

    1976-08-01

    Projects under development will increase the generating capacity of New Brunswick Electric Power Commission from 1.47 to 3.14 GW. Of these projects, the most significant is the 0.63 GW Point Lepreau CANDU reactor. Progress in the construction of the power reactor is summarized. The concrete reactor building was slipformed in April 1976. A second nuclear unit at Point Lepreau is being considered. Information is also provided on the new oil-fired station at Coleson Cove, a new oil- or coal-fired unit at Dalhousie and further hydro units at Mactaquac. A 0.16 GW pumped storage hydro unit at Green River is being considered. Information on transmission (Including the HVDC system), substations, and connection with Hydro Quebec is included.

  3. Solar photovoltaic projects in the mainstream power market

    CERN Document Server

    Wolfe, Philip

    2012-01-01

    Develop large-scale solar photovoltaic projects with this book, to feed power into a grid. Contains case studies of the Waldpolenz Energy Park, Germany, Lopburi Solar Plant in Thailand and what will be the world's largest PV plant, the Topaz Solar Farm in California. Also included are interviews from leading figures in the PV industry.Contents cover:planning and structuring projectssiting, planning and connection issuesbuilding and operating projectstechnology basicseconomies of PVhistory and business of PVfinancing and regulationtechnical aspects of system design.Supported by figures and photographs, this is for anyone wanting to master the commercial, professional, financial, engineering or political aspects of developing mega-watt solar PV projects in a mainstream power market.

  4. Code of Conduct for wind-power projects - Feasibility study

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2009-02-01

    This final report deals with the results of a feasibility study concerning the development of a Code of Conduct for wind-power projects. The aim is to strengthen the acceptance of wind-power by the general public. The necessity of new, voluntary market instruments is discussed. The urgency of development in this area is quoted as being high, and the authors consider the feasibility of the definition of a code of conduct as being proven. The code of conduct can, according to the authors, be of use at various levels but primarily in project development. Further free-enterprise instruments are also suggested that should help support socially compatible and successful market development. It is noted that the predominant portion of those questioned are prepared to co-operate in further work on the subject

  5. South Ukraine Nuclear Power Plant. Advanced Computer Information System Project

    International Nuclear Information System (INIS)

    Hord, J.; Afanasiev, N.; Smith, C.; Kudinov, Yu.

    1997-01-01

    The South Ukraine upgrade is the first of many that will take place in the former eastern bloc countries over the next several years. Westron is currently developing a similar system for the Zaporozhe nuclear power plant. In addition, there are eleven other WWER type units in operation in the Ukraine, as well as twenty seven others in operation throughout Eastern and Central Europe and Russia - all potential upgrade projects. (author)

  6. Quality management in an international nuclear power plant project

    International Nuclear Information System (INIS)

    Brion, J.; Crustin, J.

    1975-01-01

    SNR (Schneller Natriumgekuehlter Reaktor) is the fast reactor power plant being erected at Kalkar, Federal German Republic. Quality management in this project is a contractual obligation. Quality management is subdivided into quality engineering, set of actions performed before manufacturing, and quality control, set of material controls performed during fabrication. The two successive phases of the quality management are presented. The difficulties and improvment possibilities are discussed [fr

  7. The role of instrumentation and control systems in power uprating projects for nuclear power plants

    International Nuclear Information System (INIS)

    2008-01-01

    The IAEA's activities in nuclear power plant operating performance and life cycle management are aimed at increasing Member State capabilities in utilizing good engineering and management practices developed and transferred by the IAEA. In particular, the IAEA supports activities focusing on the improvement of nuclear power plant (NPP) performance, plant life management, training, power uprating, operational licence renewal, and the modernization of instrumentation and control (I and C) systems of NPPs in Member States. The subject of the I and C systems' role in power uprating projects in NPPs was suggested by the Technical Working Group on Nuclear Power Plant Control and Instrumentation in 2003. The subject was then approved by the IAEA and included in the programmes for 2004-2007. The increasing importance of power uprating projects can be attributed to the general worldwide tendency to the deregulation of the electricity market. The greater demand for electricity and the available capacity and safety margins, as well as the pressure from several operating NPPs resulted in requests for licence modification to enable operation at a higher power level, beyond the original licence provisions. A number of nuclear utilities have already gone through the uprating process for their nuclear reactors, and many more are planning to go through this modification process. In addition to mechanical and process equipment changes, parts of the electrical and I and C systems and components may also need to be altered to accommodate the new operating conditions and safety limits. This report addresses the role of I and C systems in NPP power uprating projects. The objective of the report is to provide guidance to utilities, safety analysts, regulators and others involved in the preparation, implementation and licensing of power uprating projects, with particular emphasis on the I and C aspects of these projects. As the average age of NPPs is increasing, it is becoming common for

  8. Long-term allocation of power from the Snettisham Project

    International Nuclear Information System (INIS)

    1993-01-01

    The Alaska Power Administration (APA) has prepared an Environmental Assessment (EA) (DOE/EA-0839) evaluating the Final Marketing Plan for the Snettisham Project that establishes long-term allocation and sales of power. The proposed long-term sales contract will replace a 20-year sales agreement that expires at the end of December, 1993. The EA evaluates the proposed alternative and the no action alternative. The proposed alternative replaces the expiring contract with a new 20-year contract with the same terms, conditions and allocation as the previous long-term contract. No other alternatives were developed, as there is only one utility in the Juneau area. The divestiture of this Federal project is expected to be approved by Congress; the present contractor would then assume the ownership and operation of the Snettisham Project. The EA identified no actions associated with the proposal that will cause significant environmental or socioeconomic impacts. The Final Marketing Plan for the Snettisham Project deals with the replacement of an expiring contract. The Final Marketing Plan does not include the addition of any major new resources, service to discrete major new loads, or major changes in operating parameters. No changes in rates are proposed in the Final Marketing Plan

  9. Prevention of homicidal violence in schools in Germany: the Berlin Leaking Project and the Networks Against School Shootings Project (NETWASS).

    Science.gov (United States)

    Leuschner, Vincenz; Bondü, Rebecca; Schroer-Hippel, Miriam; Panno, Jennifer; Neumetzler, Katharina; Fisch, Sarah; Scholl, Johanna; Scheithauer, Herbert

    2011-01-01

    Since 1999, Germany has experienced at least twelve serious cases of targeted school violence. This article describes two projects designed to fill the gap between universal prevention and emergency response in preventing severe forms of school violence in Germany. The Berlin Leaking Project examined the viability of preventive efforts based on early identification of leaking behavior that often precedes targeted school attacks. Leaking refers to any behavior or communication that indicates a student is preparing to carry out a violent attack. This would include explicit or implied threats of violence, apparent fascination with prior acts of violence such as Columbine, and any evidence of planning or preparation to carry out an attack. The NETWASS project will test a training program and intervention strategy based on those findings, examining the usefulness of a threat assessment approach to prevent violence by training teachers to recognize leaking behavior by students. This approach is extended by training teachers on a larger scale to identify leaking and then having a school-based team evaluate the student and initiate appropriate interventions, such as mental health services, and in some cases, law enforcement action. Copyright © 2011 Wiley Periodicals, Inc., A Wiley Company.

  10. Tecnatom support to new nuclear power plant projects

    International Nuclear Information System (INIS)

    Manrique, A. B.

    2009-10-01

    Tecnatom is a Spanish engineering company with more than 50 years of experience working for the nuclear industry all over the world. It has worked in over 30 countries in activities related to the operation and maintenance of nuclear power plants. Along this half century of history. Tecnatom has been providing its services to nuclear utilities, regulators, NPP vendors, NPP owners / operators and nuclear fuel manufacturers not only in Spain but also abroad. It started to work in the design of new nuclear power plants in the early 90 s and since then has continued collaborating with different suppliers in the design and licensing of new reactors especially in the areas of plant systems design, man-machine interface design, main control room simulators building, training, qualification of equipment and PSI/ISI engineering services. Some challenges to the reactivation of nuclear power plants construction are common worldwide, including: regulatory processes, workforce availability, construction project management, etc. Being some keys to success the following: apply qualified resources, enough resources for early planning, project leadership, organization and integration, establish a strong integrated management team. The goal of this paper is to inform regarding the capabilities of Tecnatom in the construction of new power plants. (Author)

  11. Bid Preparation and Evaluation for Nuclear Power Plant Project Management

    International Nuclear Information System (INIS)

    Mohd Idris Taib, Mohd Khairulezwan Abdul Manan and Nur Farizan Amadzun

    2011-01-01

    Bid preparation and evaluation is one of the main activities in Nuclear Power Plant Project management. International Atomic Energy Agency guide and Korean experience was studied for Malaysian requirement in realization of first Nuclear Power Plant. Several aspects shall be taken into consideration such as political scenario, financial capabilities, sitting, human resource, technologies, fuel supplies and decommissioning for long term exceeded hundred years. Bidding process and activities is proposed for our country requirement. The main activities included but unlimited to Bid Invitation Specification, Bid Evaluation Process, Technical Evaluation, Economic Bid Evaluation and Contracting. On the end of day, Malaysia need safe and reliable Nuclear Power Plant. Malaysian Economic Transformation Programme also get benefit from spin-off localization products and services as well as Technology Transfer Programme. (author)

  12. The THESEUS project -- 50 MWe solar thermal power for Crete

    Energy Technology Data Exchange (ETDEWEB)

    Schillig, F.; Geyer, M.; Kistner, R.; Aringhoff, R.; Nava, P.; Brakmann, G.

    1998-07-01

    A consortium of European industry, utilities and research institutions from Greece, Germany, Spain and Italy attempts to implement a 52 MWe solar thermal power plant with parabolic trough technology on the Greek island of Crete sponsored by the EU' s THERMIE program. The increased demand for electricity on the island, a consequence of the growing allurement of the island as a tourist resort, makes it necessary to expand the installed capacity on Crete during the next years. According to the capacity expansion plans of Greek' s utility PPC a 160 MWe heavy fuel-fired power plant complex--two 30 MWe diesel units and two 50 MWe steam turbine units--is foreseen to be built by the year 2002. In this paper a description of the technical, economical and environmental aspects of the THESEUS project is provided. Moreover a market entry strategy for solar thermal power generation is discussed.

  13. University-Level Research Projects for High School Students

    Science.gov (United States)

    McConnell, Mark L.

    2000-01-01

    The goal of this project was to provide an opportunity for high school students to participate in university-level research projects. In this case, students from Pinkerton Academy (Derry, New Hampshire) were invited to participate in efforts to catalog data from the COMPTEL experiment on NASA's Compton Gamma-Ray Observatory (CGRO). These activities were part of a senior level honors course at Pinkerton. Although the success of this particular program was rather limited, we feel that the general concept is a sound one. In principle, the concept of partnerships between local schools and university researchers is one that could be especially attractive to soft money researchers. Programs can be carefully designed to benefit both the students and the research program.

  14. Your School's Web Site-A Powerful Tool for Marketing.

    Science.gov (United States)

    Say, Michael W.; Collier, Karen J.; Hoya, Charlotte, G.

    2001-01-01

    A successful marketing plan requires a conceptual framework, the ability to target an audience effectively, and the strategy for positioning the school organization appropriately. A website can be a powerful marketing tool if it focuses on what users want and provides it in an organized, accessible fashion. (MLH)

  15. Bullies, Bullying and Power in the Contexts of Schooling

    Science.gov (United States)

    Bansel, Peter; Davies, Bronwyn; Laws, Cath; Linnell, Sheridan

    2009-01-01

    In this paper the four authors explore the experience of school bullying, drawing on stories of bullying generated in a collective biography workshop and on fictional accounts of bullying. They counter the current trend of reading bullying as individual or family pathology with a post-structuralist analysis of subjectification and power.

  16. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  17. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  18. Environmental studies and clearance compliance of Kudankulam Atomic Power Project

    International Nuclear Information System (INIS)

    Agarwal, S.K.; Singh, Jitendra

    2002-01-01

    Full text: Nuclear industry has played a leading role in evolving proper and effective environmental management impact from development practices right form inception thus minimizing the environmental impact from developmental activities of man. In the engineering design of nuclear power plant, safety is further enhanced considerably by providing double back-upped engineered safety systems. Besides the engineered safety, the other factors considered for ensuring environmental impact minimization are siting criteria, conservative rad-waste management, effluent treatment, application of stringent environmental protection standards for limiting waste discharges, an elaborate environmental surveillance program and an on site and off site emergency preparedness plan. Recently, nuclear power industry has taken a drive to develop and implement Environmental Management System (EMS) to all its operating stations in line with ISO-14001 standards. For Kudankulam atomic power project, a number of studies specifically for environmental protection are carried out to meet the requirements of Russian Federation, new guidelines of Ministry of environment and Forests (MOEF) and Atomic Energy Regulatory Board (AERB). In the present paper an attempt has been made to present the environmental management plan and clearance compliance status of the project

  19. Completion of Belene Nuclear Power Plant: Project perspectives

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2006-01-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  20. Completion of Belene Nuclear Power Plant: Project perspectives

    Energy Technology Data Exchange (ETDEWEB)

    Bogdanov, D. [Risk Engineering Ltd., CREFID, 34 Totleben Blvd., Sofia 1606 (Bulgaria)]. E-mail: bogdanov@riskeng.bg

    2006-07-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  1. Project approach study for nuclear power plants in the Netherlands

    International Nuclear Information System (INIS)

    1985-11-01

    The new nuclear program in the Netherlands comprises the construction of two to four nuclear power plants up to the year 2000. The main objective pursued with the implementation of the nuclear program is the supply of low-cost electricity in the future. In order to prepare the program and to provide a basis for further decisions, the Ministry of Economic Affairs has entrusted Motor-Columbus Consulting Engineers Inc., Baden, Switzerland, with a study to determine the most suitable project approach option(s) for the implementation of the future nuclear program in the Netherlands. In carrying out this study, Motor-Columbus investigated the following main project approach options: 1. turnkey contract approach; 2. split-package contract approach; 3. multi-contract approach. It is concluded that if applied in the appropriate way, the normal turnkey contract approach represents the most suitable approach under the prevailing situation in the Netherlands. (orig.)

  2. Kenya geothermal private power project: A prefeasibility study

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    Twenty-eight geothermal areas in Kenya were evaluated and prioritized for development. The prioritization was based on the potential size, resource temperature, level of exploration risk, location, and exploration/development costs for each geothermal area. Suswa, Eburru and Arus are found to offer the best short-term prospects for successful private power development. It was found that cost per kill developed are significantly lower for the larger (50MW) than for smaller-sized (10 or 20 NW) projects. In addition to plant size, the cost per kill developed is seen to be a function of resource temperature, generation mode (binary or flash cycle) and transmission distance.

  3. The Empowering Schools Project: Identifying the Classroom and School Characteristics That Lead to Student Empowerment

    Science.gov (United States)

    Kirk, Chris Michael; Lewis, Rhonda K.; Brown, Kyrah; Karibo, Brittany; Scott, Angela; Park, Elle

    2017-01-01

    In an education system marred by inequity, urban schools in the United States are faced with the challenge of helping students from marginalized groups succeed. While many strategies have been tried, most are built on deficit-based models that blame students and teachers for a lack of achievement and ignore the role of power within the school…

  4. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  5. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  6. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  7. Financing Nuclear Power Plant Projects. A New Paradigm?

    International Nuclear Information System (INIS)

    Pehuet Lucet, Fabienne

    2015-05-01

    There are currently 435 operable nuclear power reactors around the world, with a further 71 under construction. Two main proven financing models were applied to nuclear plants in the past: the national model, and the corporate model. The historical model of financing is the national model. It allowed for the most efficient risk allocation model in then-regulated national electricity markets: government or state-owned utilities with government guarantee assumed the risks of building nuclear power plants locally. The national model has proven to be efficient in France, Russia and the USA where it was modified to support private business initiatives. It was then replicated in Japan, Korea and China where significant nuclear programs were developed. In the corporate business model, the owner of the plant assumes most of the risk, but various schemes are used to mitigate the owner's risk by transmitting large areas of risks to others: vendors for construction risk as in Finland, government through loans guarantees etc. As projects became international, a set of common principles were approved by OECD countries concerning financing and the role of Export Credit Agencies. The objective was to provide competition rules whereby exporters compete on the basis of the price and quality of their products rather than the financial terms provided. Various combinations of these models were and still are implemented. Pure Project Finance was not implemented for nuclear power plants, but the model nurtures reflections about new financing models. The context in which nuclear power projects are now decided and financed changed drastically: it is a new paradigm. Risk allocation and financial conditions are at the forefront of competition to win new nuclear projects' tenders insofar as reducing uncertainties is a decisive competition edge. In a context of electricity market deregulation and high construction risks, investors and lenders require more and more securities to

  8. Concentrating Solar Power Projects - KaXu Solar One | Concentrating Solar

    Science.gov (United States)

    Power | NREL KaXu Solar One This page provides information on KaXu Solar One, a concentrating solar power (CSP) project, with data organized by background, parcipants and power plant configuration . Status Date: April 14, 2015 Project Overview Project Name: KaXu Solar One Country: South Africa Location

  9. Power-Efficient Computing: Experiences from the COSA Project

    Directory of Open Access Journals (Sweden)

    Daniele Cesini

    2017-01-01

    Full Text Available Energy consumption is today one of the most relevant issues in operating HPC systems for scientific applications. The use of unconventional computing systems is therefore of great interest for several scientific communities looking for a better tradeoff between time-to-solution and energy-to-solution. In this context, the performance assessment of processors with a high ratio of performance per watt is necessary to understand how to realize energy-efficient computing systems for scientific applications, using this class of processors. Computing On SOC Architecture (COSA is a three-year project (2015–2017 funded by the Scientific Commission V of the Italian Institute for Nuclear Physics (INFN, which aims to investigate the performance and the total cost of ownership offered by computing systems based on commodity low-power Systems on Chip (SoCs and high energy-efficient systems based on GP-GPUs. In this work, we present the results of the project analyzing the performance of several scientific applications on several GPU- and SoC-based systems. We also describe the methodology we have used to measure energy performance and the tools we have implemented to monitor the power drained by applications while running.

  10. Distributed power in Afghanistan: The Padisaw micro-hydro project

    International Nuclear Information System (INIS)

    Hallett, Michael

    2009-01-01

    The provision of electricity is a vital need in reconstruction and development situations, like that in Afghanistan. Indeed, according to the Afghan government's Afghan National Development Strategy (ANDS) the need for electricity featured in 80% of the Provincial Development Plans as a top priority. With the help of the International Community, the government of Afghanistan is attempting to develop a new market oriented approach to the nationwide provision of electrical power. Although the bulk of the electrification effort is directed toward large scale construction of a national grid, the ANDS explicitly mentions a role for 'micro-hydro, solar, waste and small scale diesel power and energy generating sources'. This article will describe a micro-hydro project in Padisaw village, in the Nurgaram district of Nuristan province located in Northeastern Afghanistan and the role Provincial Reconstruction Team played in working with the local community through the project planning and building processes and offer some observation on how, as the Afghan National Development Strategy is executed, the private sector can play an increasingly significant role in the Afghan distributed energy arena. (author)

  11. Birds and bird habitats: guidelines for wind power projects

    International Nuclear Information System (INIS)

    2010-10-01

    Established in 2009, the Green Energy Act aims to increase the use of renewable energy sources including wind, water, solar and bioenergy in Ontario. The development of these resources is a major component of the province's plan, which aims to mitigate the contribution to climate change and to involve the Ontario's economy in the improvement of the quality of the environment. The Green Energy Act also considers as important the implementation of a coordinated provincial approval process, suggesting the integration of all Ministry requirements into a unique process during the evaluation of newly proposed renewable energy projects. The Ministry of the Environment's Renewable Energy Approval Regulation details the requirements for wind power projects involving significant natural features. Birds are an important part of Ontario's biodiversity and, according to the Ministry of Natural Resources, their habitats are considered as significant wildlife habitat (SWH). The Renewable Energy Approval Regulation and this guideline are meant to provide elements and guidance in order to protect bird SWH during the selection of a location of wind power facilities. . 27 refs., 1 tab., 2 figs.

  12. Feasibility study for Tashkent Heat and Power Plant Modernizing Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    An investigational study was carried out of the project for energy conservation and greenhouse effect gas emission reduction by introducing the newest and most powerful gas turbine cogeneration facilities to the Tashkent cogeneration plant in Uzbekistan. At the Tashkent cogeneration plant, each of the facilities is being superannuated, which leads to lowering of operational reliability and increase in cost of repairs. In the project, studied was the introduction of the newest and most powerful gas turbine cogeneration facilities with heat output of 100 Gcal/h equivalent to that of one can of the existing hot water boiler and with generated output of 80MW. As a result of the study, obtained were the energy conservation amount of 83.9 ktoe/y and the greenhouse effect gas reduction amount of 179.7 kt-CO2/y. The initial investment amount was 10.003 billion yen. Expenses vs. effects were 8.39 toe/y-million yen in energy conservation amount and 18.0 t-CO2/y-million yen in greenhouse effect gas reduction amount. In the study of profitability, the internal earning rate was 9.24% after tax, the return yield of capital was 41.26%, and the period of ROI was 16.9 years. (NEDO)

  13. Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools

    Energy Technology Data Exchange (ETDEWEB)

    Coughlin, J.; Kandt, A.

    2011-10-01

    This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

  14. Electric Power Saving Awareness System at School Using ICT

    Directory of Open Access Journals (Sweden)

    Kuzume Koichi

    2016-01-01

    Full Text Available Nowadays, education on energy saving at schools attracts attention to reduce energy consumption. In this paper we proposed a novel system to promote energy conservation activity at schools using a sensor network. The system consisted of a wall-type clock embedded with several kinds of sensors for temperature and light in the classroom, and wireless devices to connect to a cloud computer network. The system had the following superiorities: offered various services for energy conservation activity, needless of CT (Current Transformer sensor, low price, ease of installation and extension, and visualization of power consumption in conjunction with school timetable in real time. We presented the system and a user study conducted to evaluate its usefulness.

  15. Pinon Pine power project nears start-up

    Energy Technology Data Exchange (ETDEWEB)

    Tatar, G.A. [Sierra Pacific Power Co., Reno, NV (United States); Gonzalez, M. [Foster Wheeler USA Corp., Clinton, NJ (United States); Mathur, G.K. [M.W. Kellogg Co., Houston, TX (United States)

    1997-12-31

    The IGCC facility being built by Sierra Pacific Power Company (SPPCo) at their Tracy Station in Nevada is one of three IGCC facilities being cost-shared by the US Department of Energy (DOE) under their Clean Coal Technology Program. The specific technology to be demonstrated in SPPCo`s Round Four Project, known as the Pinon Pine IGCC Project, includes the KRW air blown pressurized fluidized bed gasification process with hot gas cleanup coupled with a combined cycle facility based on a new GE 6FA gas turbine. Construction of the 100 MW IGCC facility began in February 1995 and the first firing of the gas turbine occurred as scheduled on August 15, 1996 with natural gas. Mechanical completion of the gasifier and other outstanding work is due in January 1997. Following the startup of the plant, the project will enter a 42 month operating and testing period during which low sulfur western and high sulfur eastern or midwestern coals will be processed.

  16. Solar wind monitor—a school geophysics project

    Science.gov (United States)

    Robinson, Ian

    2018-05-01

    Described is an established geophysics project to construct a solar wind monitor based on a nT resolution fluxgate magnetometer. Low-cost and appropriate from school to university level it incorporates elements of astrophysics, geophysics, electronics, programming, computer networking and signal processing. The system monitors the earth’s field in real-time uploading data and graphs to a website every few minutes. Modular design encourages construction and testing by teams of students as well as expansion and refinement. The system has been tested running unattended for months at a time. Both the hardware design and software is published as open-source [1, 10].

  17. Application of ABWR construction database to nuclear power plant project

    International Nuclear Information System (INIS)

    Takashima, Atsushi; Katsube, Yasuhiko

    1999-01-01

    Tokyo Electric Power Company (TEPCO) completed the construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and No. 7 (K-6/7) as the first advanced boiling water reactors (ABWR) in the world successfully. K-6 and K-7 started their commercial operations in November, 1996 and in July, 1997 respectively. We consider ABWR as a standard BWR in the world as well as in Japan because ABWR is highly reputed. However, because the interval of our nuclear power plant construction is going to be longer, our engineering level on plant construction will be declining. Hence it is necessary for us to maintain our engineering level. In addition to this circumstance, we are planning to wide application of separated purchase orders for further cost reduction. Also there is an expectation for our contribution to ABWR plant constructions overseas. As facing these circumstances, we have developed a construction database based on our experience for ABWR construction. As the first step of developing the database for these use, we analyzed our own activities in the previous ABWR construction. Through this analysis, we could define activity units of which the project consists. As the second step, we clarified the data which are treated in each activity unit and the interface among them. By taking these steps, we could develop our database efficiently. (author)

  18. Data base on nuclear power plant dose reduction research projects

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Baum, J.W.

    1986-10-01

    Staff at the ALARA Center of Brookhaven National Laboratory have established a data base of information about current research that is likely to result in lower radiation doses to workers. The data base, concerned primarily with nuclear power generation, is part of a project that the ALARA Center is carrying out for the Nuclear Regulatory Commission. This report describes its current status. A substantial amount of research on reducing occupational exposure is being done in the US and abroad. This research is beginning to have an impact on the collective dose expenditures at nuclear power plants. The collective radiation doses in Europe, Japan, and North America all show downward trends. A large part of the research in the US is either sponsored by the nuclear industry through joint industry organizations such as EPRI and ESEERCO or is done by individual corporations. There is also significant participation by smaller companies. The main emphasis of the research on dose reduction is on engineering approaches aimed at reducing radiation fields or keeping people out of high-exposure areas by using robotics. Effective ALARA programs are also underway at a large number of nuclear plants. Additional attention should be given to non-engineering approaches to dose reduction, which are potentially very useful and cost effective but require quantitative study and analysis based on data from nuclear power plants. 9 refs., 1 fig.

  19. Nevada Renewable Energy Training Project: Geothermal Power Plant Operators

    Energy Technology Data Exchange (ETDEWEB)

    Jim, Nichols [Truckee Meadows Community College, Reno, NV (United States)

    2014-04-29

    The purpose of this project was to develop and institute a training program for certified geothermal power plant operators (GPO). An advisory board consisting of subject matter experts from the geothermal energy industry and academia identified the critical skill sets required for this profession. A 34-credit Certificate of Achievement (COA), Geothermal Power Plant Operator, was developed using eight existing courses and developing five new courses. Approval from the Nevada System of Higher Education Board of Regents was obtained. A 2,400 sq. ft. geothermal/fluid mechanics laboratory and a 3,000 sq. ft. outdoor demonstration laboratory were constructed for hands-on training. Students also participated in field trips to geothermal power plants in the region. The majority of students were able to complete the program in 2-3 semesters, depending on their level of math proficiency. Additionally the COA allowed students to continue to an Associate of Applied Science (AAS), Energy Technologies with an emphasis in Geothermal Energy (26 additional credits), if they desired. The COA and AAS are stackable degrees, which provide students with an ongoing career pathway. Articulation agreements with other NSHE institutions provide students with additional opportunities to pursue a Bachelor of Applied Science in Management or Instrumentation. Job placement for COA graduates has been excellent.

  20. The SISIFO project: Seismic Safety at High Schools

    Science.gov (United States)

    Peruzza, Laura; Barnaba, Carla; Bragato, Pier Luigi; Dusi, Alberto; Grimaz, Stefano; Malisan, Petra; Saraò, Angela; Mucciarelli, Marco

    2014-05-01

    For many years, the Italian scientific community has faced the problem of the reduction of earthquake risk using innovative educational techniques. Recent earthquakes in Italy and around the world have clearly demonstrated that seismic codes alone are not able to guarantee an effective mitigation of risk. After the tragic events of San Giuliano di Puglia (2002), where an earthquake killed 26 school children, special attention was paid in Italy to the seismic safety of schools, but mainly with respect to structural aspects. Little attention has been devoted to the possible and even significant damage to non-structural elements (collapse of ceilings, tipping of cabinets and shelving, obstruction of escape routes, etc..). Students and teachers trained on these aspects may lead to a very effective preventive vigilance. Since 2002, the project EDURISK (www.edurisk.it) proposed educational tools and training programs for schools, at primary and middle levels. More recently, a nationwide campaign aimed to adults (www.iononrischio.it) was launched with the extensive support of civil protection volounteers. There was a gap for high schools, and Project SISIFO was designed to fill this void and in particular for those schools with technical/scientific curricula. SISIFO (https://sites.google.com/site/ogssisifo/) is a multidisciplinary initiative, aimed at the diffusion of scientific culture for achieving seismic safety in schools, replicable and can be structured in training the next several years. The students, helped by their teachers and by experts from scientific institutions, followed a course on specialized training on earthquake safety. The trial began in North-East Italy, with a combination of hands-on activities for the measurement of earthquakes with low-cost instruments and lectures with experts in various disciplines, accompanied by specifically designed teaching materials, both on paper and digital format. We intend to raise teachers and students knowledge of the

  1. 47 CFR 74.785 - Low power TV digital data service pilot project.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV digital data service pilot project... Power TV, TV Translator, and TV Booster Stations § 74.785 Low power TV digital data service pilot project. Low power TV stations authorized pursuant to the LPTV Digital Data Services Act (Public Law 106...

  2. Projected role of nuclear power in Egypt and problems encountered in implementing the first nuclear plant

    International Nuclear Information System (INIS)

    Effat, K.E.A.; Sirry, H.; El-Fouly, M.F.; El-Sharkawy, E.; El-Saiedi, A.F.

    1977-01-01

    This paper reviews the present and projected power demands in Egypt and the factors behind the decision to introduce a nuclear power generation program. Different problems encountered and anticipated in introducing the first nuclear power plant are also discussed

  3. Vermont EPSCoR Streams Project: Engaging High School and Undergraduate Students in Watershed Research

    Science.gov (United States)

    Ray, E.; McCabe, D.; Sheldon, S.; Jankowski, K.; Haselton, L.; Luck, M.; van Houten, J.

    2009-12-01

    The Vermont EPSCoR Streams Project engages a diverse group of undergraduates, high school students, and their teachers in hands-on water quality research and exposes them to the process of science. The project aims to (1) recruit students to science careers and (2) create a water quality database comprised of high-quality data collected by undergraduates and high school groups. The project is the training and outreach mechanism of the Complex Systems Modeling for Environmental Problem Solving research program, an NSF-funded program at the University of Vermont (UVM) that provides computational strategies and fresh approaches for understanding how natural and built environments interact. The Streams Project trains participants to collect and analyze data from streams throughout Vermont and at limited sites in Connecticut, New York, and Puerto Rico. Participants contribute their data to an online database and use it to complete individual research projects that focus on the effect of land use and precipitation patterns on selected measures of stream water quality. All undergraduates and some high school groups are paired with a mentor, who is either a graduate student or a faculty member at UVM or other college. Each year, undergraduate students and high school groups are trained to (1) collect water and macroinvertebrate samples from streams, (2) analyze water samples for total phosphorus, bacteria, and total suspended solids in an analytical laboratory, and/or (3) use geographic information systems (GIS) to assess landscape-level data for their watersheds. After training, high school groups collect samples from stream sites on a twice-monthly basis while undergraduates conduct semi-autonomous field and laboratory research. High school groups monitor sites in two watersheds with contrasting land uses. Undergraduate projects are shaped by the interests of students and their mentors. Contribution to a common database provides students with the option to expand the

  4. Thermal Energy Corporation Combined Heat and Power Project

    Energy Technology Data Exchange (ETDEWEB)

    Turner, E. Bruce [Thermal Energy Corporation, Houston, TX (United States); Brown, Tim [Thermal Energy Corporation, Houston, TX (United States); Mardiat, Ed [Burns and McDonnell Engineering Company, Inc., Kansas City, MI (United States)

    2011-12-31

    To meet the planned heating and cooling load growth at the Texas Medical Center (TMC), Thermal Energy Corporation (TECO) implemented Phase 1 of a Master Plan to install an additional 32,000 tons of chilled water capacity, a 75,000 ton-hour (8.8 million gallon) Thermal Energy Storage (TES) tank, and a 48 MW Combined Heat and Power (CHP) system. The Department of Energy selected TMC for a $10 million grant award as part of the Financial Assistance Funding Opportunity Announcement, U.S. Department of Energy National Energy Technology, Recovery Act: Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficiency Industrial Equipment Funding Opportunity Number: DE-FOA-0000044 to support the installation of a new 48 MW CHP system at the TMC located just outside downtown Houston. As the largest medical center in the world, TMC is home to many of the nation's best hospitals, physicians, researchers, educational institutions, and health care providers. TMC provides care to approximately six million patients each year, and medical instruction to over 71,000 students. A medical center the size of TMC has enormous electricity and thermal energy demands to help it carry out its mission. Reliable, high-quality steam and chilled water are of utmost importance to the operations of its many facilities. For example, advanced medical equipment, laboratories, laundry facilities, space heating and cooling all rely on the generation of heat and power. As result of this project TECO provides this mission critical heating and cooling to TMC utilizing a system that is both energy-efficient and reliable since it provides the capability to run on power independent of the already strained regional electric grid. This allows the medical center to focus on its primary mission providing top quality medical care and instruction without worrying about excessive energy costs or the loss of heating and cooling due to the risk of power

  5. Boundary Crossing in R&D Projects in Schools: Learning through Cross-Professional Collaboration

    Science.gov (United States)

    Schenke, Wouter; van Driel, Jan; Geijsel, Femke P.; Volman, Monique L. L.

    2017-01-01

    Background/Context: School leaders, teachers, and researchers are increasingly involved in collaborative research and development (R&D) projects in schools, which encourage crossing boundaries between the fields of school and research. It is not clear, however, what and how professionals in these projects learn through cross-professional…

  6. Pilot project "The zoo goes to school", enriching the classroom

    Directory of Open Access Journals (Sweden)

    Michel Mendes

    2014-12-01

    Full Text Available Environmental education does not only occur in formal institutions, and yes has been widely disseminated among non formal spaces of education, which complements its ecological and social nature. Zoos are the institutions that play an important role in environmental education, raising awareness and preparing citizens to act in the critically and ethical society, committed to the environment. The objective of this study was to evaluate the environmental perception of students in 7th grade of elementary school in Municipal Elementary School Jardelino Ramos, in partnership with the Zoo, University of Caxias do Sul. Twenty-four questionnaires were applied in order to diagnose the environmental perception of students through four questions regarding activities at the zoo. After it was contextualized and discussed on the topics: zoos and their history, function, animals and their enclosures, technical education and environmental enrichment. To complement the enrichment technique discussed in class, the students sewed materials that were later added to the precincts of animals chosen for themselves. A week after the project is completed was held again the questionnaire to verify the results obtained from the project. These were analyzed, discussed and compared through graphs, which show that the objectives were achieved and the didactics used was efficient, as described in the article.

  7. Money and age in schools: Bullying and power imbalances.

    Science.gov (United States)

    Chaux, Enrique; Castellanos, Melisa

    2015-05-01

    School bullying continues to be a serious problem around the world. Thus, it seems crucial to clearly identify the risk factors associated with being a victim or a bully. The current study focused in particular on the role that age and socio-economic differences between classmates could play on bullying. Logistic and multilevel analyses were conducted using data from 53,316 5th and 9th grade students from a representative sample of public and private Colombian schools. Higher age and better family socio-economic conditions than classmates were risk factors associated with being a bully, while younger age and poorer socio-economic conditions than classmates were associated with being a victim of bullying. Coming from authoritarian families or violent neighborhoods, and supporting beliefs legitimizing aggression, were also associated with bullying and victimization. Empathy was negatively associated with being a bully, and in some cases positively associated with being a victim. The results highlight the need to take into account possible sources of power imbalances, such as age and socio-economic differences among classmates, when seeking to prevent bullying. In particular, interventions focused on peer group dynamics might contribute to avoid power imbalances or to prevent power imbalances from becoming power abuse. Aggr. Behav. 41:280-293, 2015. © 2014 Wiley Periodicals, Inc. © 2014 Wiley Periodicals, Inc.

  8. Collaborative School Innovation Project as a Pivot for Teachers' Professional Development: The Case of Acharnes' Second Chance School in Greece

    Science.gov (United States)

    Katsarou, Eleni; Tsafos, Vassilis

    2008-01-01

    A collaborative school innovation project is explored as a pivot for the professional development of the teachers involved. The Second Chance School (SCS) of Acharnes in Greece constitutes such a collaborative innovative project, regarding the underlying theory of multiliteracies, its decentralised character, respect for student individuality, and…

  9. Aggression in Primary Schools: The Predictive Power of the School and Home Environment

    Science.gov (United States)

    Kozina, Ana

    2015-01-01

    In this study, we analyse the predictive power of home and school environment-related factors for determining pupils' aggression. The multiple regression analyses are performed for fourth- and eighth-grade pupils based on the Trends in Mathematics and Science Study (TIMSS) 2007 (N = 8394) and TIMSS 2011 (N = 9415) databases for Slovenia. At the…

  10. I Don't Do School: Correlations of School Culture, Power, Fairness, and Behaviour Perceptions

    Science.gov (United States)

    Robinson, Derrick; Watson, Marcia; Adams, Tempestt

    2015-01-01

    Student perceptions of fairness shape behavioural responses that impact the climate of a school. However, prevailing literature on student perceptions fails to critically explore culture, power, and self-concept. This study bridges these gaps through connecting student perception and self-concept as a collective and individual experience of…

  11. Design interface management system for nuclear power plant project

    International Nuclear Information System (INIS)

    Wang Jun

    2012-01-01

    Design interfaces exist between different participants and during the whole course of a nuclear power project, and include different disciplinary requirements. The purpose of interface management is to establish a procedure, which can be efficiently used to control the complex design interfaces and ensure its compliance with NPP design requirements. To this end, a complete work procedures and relationship will be defined and classified, so as to set up the structure of interface management system. The system consists of three levels, i.e. working procedure level, management tool level and technical document level. Two management routes, i.e. administration route and technical route, are adopted so as to conduct management efficiently. (author)

  12. Completion of Mochovce 1 and 2 nuclear power plant project

    International Nuclear Information System (INIS)

    Valach, J.

    2000-01-01

    Commissioning of the Mochovce Nuclear Power Plant unit 2 fully completed the Mochovce unit 1 and 2 project. The power plant construction passed through a complicated evolution since early 80's. The genesis started with the change of the plant location due to a seismic resistance requirement raised by the former Czechoslovak Atomic Energy Commission, change of the design and contractor of the Instrumentation and Control system in early 90's, halt of construction in 1993 till 1996 due to a lack of funding, as well as a series of international reviews of safety aspects. All the obstacles had been overcome in the end, and completion works were re-started in 1996. Looking back to the unit 1 and 2 completion project, I would like to highlight some aspects of the project, particularly the level of safety, technical and organisational conditions, and terms of funding. The most important argument for completion of the plant was that VVER 440/213 reactor units were distinguished with very high level of passive safety, even overcoming Western-type PWR's in some aspects. The replacement of the original I and C system was another important contribution to the initial level of safety. International safety reviews performed at Mochovce NPP between 1990 and 1995 (Siemens, EdF, IAEA, RlSKAUDIT) confirmed the high level of safety of VVER 440/213 reactors, however, pointed out at some safety issues which had not been dealt with in the design. Those included e.g. the 'external risks', primary-to-secondary leaks, qualification of pressurizer safety valves, and others. It is necessary to stress that the Safety Improvement Programme defined for Mochovce NPP to comply with international standards did not become the most important part of the completion project due to external pressures, but based on natural requirements on nuclear power plant safety level generally accepted in 90's. The good example could be the seismic resistance of the plant which, though designed as seismic resistant

  13. Technical Description Lillgrund Wind Power Plant. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Jeppsson, Joakim; Larsen, Poul Erik; Larsson, Aake [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2008-09-15

    Lillgrund offshore wind power plant comprises 48 wind turbines, each rated at 2.3 MW, bringing the total wind farm capacity to 110 MW. The Lillgrund offshore wind power plant is located in a shallow area of Oeresund, 7 km off the coast of Sweden and 7 km south from the Oeresund Bridge connecting Sweden and Denmark. An average wind speed of around 8,5 m/s at hub height, combined with a relatively low water depth of 4 to 8 meters makes it economically feasible to build here. Vattenfall Vindkraft AB is the owner and operator of Lillgrund offshore wind power plant. Lillgrund is a Swedish pilot project supported by the Swedish Energy Agency. The bidding process was completed during 2005 and the offshore power plant was constructed in the period 2006 to 2007. The wind farm was constructed on time and has now been successfully operational since December 2007. There is, however, always potential for improvement and the aim of this report has been to determine and highlight these areas. It is worth noting out that only the electrical system and the foundations are tailor made at offshore wind power plants. The wind turbines are more or less standard products with none or very limited possibilities for project specific design changes. Geotechnical investigations are expensive and it can be difficult to balance the risks as well as the benefits of this expense in the early phases of a large infrastructure project. As a whole, the geotechnical surveys at Lillgrund proved to be useful. They identified potential issues, such as the fact that extra excavation was required for two of the foundations. It also revealed the location of a small number of boulders that would have to be removed. Vattenfall requested a complete study of the electrical system for Lillgrund to be delivered with the bids. That request was not met. Instead Siemens Wind Power began a complete electrical system study after being awarded the Contract. The electrical system study was completed during the

  14. Evaluation of authentic science projects on climate change in secondary schools : a focus on gender differences

    NARCIS (Netherlands)

    Dijkstra, Elma; Goedhart, Martin

    2011-01-01

    Background and purpose: This study examines secondary-school students' opinions on participating in authentic science projects, which are part of an international EU project on climate change research in seven countries. Partnerships between schools and research institutes result in student projects

  15. Evaluation of Authentic Science Projects on Climate Change in Secondary Schools: A Focus on Gender Differences

    Science.gov (United States)

    Dijkstra, Elma; Goedhart, Martin

    2011-01-01

    Background and purpose: This study examines secondary-school students' opinions on participating in authentic science projects which are part of an international EU project on climate change research in seven countries. Partnerships between schools and research institutes result in student projects, in which students work with and learn from…

  16. DETERMINANTS AFFECTING THE SUCCESS OF DISTRIBUTION GRID PROJECTS IN BINH THUAN POWER COMPANY, VIETNAM

    OpenAIRE

    Pham Van Tai* & Le Duc Thu

    2017-01-01

    The research identified the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company, clarify the mutual relationship between the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company and recommended and rated the solution to enhance the success of the distribution grid project in Binh Thuan Power Company. The research had found fours critical factors: External factors of project, Controlling and coordina...

  17. Assessment and Evaluation Report on a Pilot Project on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    In 2002, efforts started on formulating a maintenance policy for schools and other social service facilities in Eritrea. Since then, an appropriate policy and related implementation strategies have been further developed. In 2003, a specific pilot project was designed covering a number of schools...... of a school based approach to school maintenance are presented in the report....

  18. Educating for Freedom and Responsibility: Lessons From the First Amendment Schools Project

    Science.gov (United States)

    Mitchell, Cynthia

    2016-01-01

    The First Amendment Schools project holds rich lessons in how to change school cultures into "laboratories of democracy"--as well as in how to increase the odds of success for any school reform effort. School reform programs of any sort need to make sure to build in sustainability, to provide ways to spread their lessons beyond the…

  19. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  20. Development Project of Supercritical-water Cooled Power Reactor

    International Nuclear Information System (INIS)

    Kataoka, K.; Shiga, S.; Moriya, K.; Oka, Y.; Yoshida, S.; Takahashi, H.

    2002-01-01

    A Supercritical-water Cooled Power Reactor (SCPR) development project (Feb. 2001- Mar. 2005) is being performed by a joint team consisting of Japanese universities and nuclear venders with a national fund. The main objective of this project is to provide technical information essential to demonstration of SCPR technologies through concentrating three sub-themes: 'plant conceptual design', 'thermohydraulics', and 'material and water chemistry'. The target of the 'plant conceptual design sub-theme' is simplify the whole plant systems compared with the conventional LWRs while achieving high thermal efficiency of more than 40 % without sacrificing the level of safety. Under the 'thermohydraulics sub-theme', heat transfer characteristics of supercritical-water as a coolant of the SCPR are examined experimentally and analytically focusing on 'heat transfer deterioration'. The experiments are being performed using fron-22 for water at a fossil boiler test facility. The experimental results are being incorporated in LWR analytical tools together with an extended steam/R22 table. Under the 'material and water chemistry sub-theme', material candidates for fuel claddings and internals of the SCPR are being screened mainly through mechanical tests, corrosion tests, and simulated irradiation tests under the SCPR condition considering water chemistry. In particular, stress corrosion cracking sensitivity is being investigated as well as uniform corrosion and swelling characteristics. Influences of water chemistry on the corrosion product characteristics are also being examined to find preferable water condition as well as to develop rational water chemistry controlling methods. (authors)

  1. Power is in the Process: The ACCORD project

    Directory of Open Access Journals (Sweden)

    Mhairi Maxwell

    2017-06-01

    Full Text Available The ACCORD (Archaeology Community Co-Production of Research Data project worked together with communities to create 3D digital visualisations of heritage. Communities across Scotland chose monuments and sites that were of particular interest to them and then participated in the whole process of creating 3D visualisations of those places (from data-capture, to processing, to archiving together with researchers and heritage professionals. In the main we used consumer-level technology and relatively easy to pick up techniques of photogrammetry and Reflectance Transformation Imaging, while occasionally also using the specialist technique of laser-scanning I was the Post-Doctoral- Research-Assistant on the ACCORD project for 12 months from March 2014 through to 2015 and this article will reflect on my experience of participating in the making of 3D digital visualisations together with ACCORD communities. It argues that there exists in the field of digital heritage an uneasy tension between the current motivation to produce objective computerised visualisations and the actual desire of heritage community groups to connect to the past on a more emotional level. The article revels in the participatory process of making 3D digital visualisations of heritage; its power as a medium for inclusion, exploration and expression. This article should be read with reference to the archive.

  2. The Japan Power Demonstration Reactor dismantling project. Radiation control

    International Nuclear Information System (INIS)

    Tomii, Hiroyuki; Seiki, Yoshihiro

    1996-01-01

    In the Japan Power Demonstration Reactor (JPDR) dismantling project, radiation control was performed properly with routine and special monitoring to keep the occupational safety and to collect data necessary for future dismantling of nuclear facilities. This report describes a summary of radiation control in the dismantling activities and some results of parametric analysis on dose equivalent evaluation, and introduces the following knowledge on radiological protection effectiveness of the dismantling systems applied in the project. a) Use of remote dismantling systems was effective in reducing equivalent workplace exposure. b) Utilization of existing facilities as radiation shield or radioactivity containment was effective in reducing workplace exposure, and also in increasing work efficiency. c) Use of underwater cutting systems was useful to minimize air contamination, and to reduce the dose equivalent rate in the working area. d) In the planning of dismantling, it is necessary to optimize the radiation protection by analyzing dismantling work procedures and evaluating radiological features of the dismantling systems applied, including additional work which the systems require brought from such activities. (author)

  3. Summer transport patterns affecting the Mohave Power Project emission

    Energy Technology Data Exchange (ETDEWEB)

    Farber, R.J.; Hoffer, T.E.; Green, M.C.; Walsh, P.A. [Southern California Edison, Rosemead, CA (United States)

    1997-03-01

    The Mohave Power Project (MPP) is an isolated 1580-MW coal-fired electric generating plant located in Laughlin, NV. Laughlin is a small desert gambling town situated in the lower Colorado River Valley near the junction of three states: Nevada, California, and Arizona. The location of the MPP is approximately 155 km southwest of the western end of the Grand Canyon National Park and about 240 km southwest from the Grand Canyon Village. This paper describes the summer transport patterns of the MPP emittants using illustrated examples from the Project MOHAVE (measurements of Haze and Visual Effects) 1992 summer intensive study. The intensive study lasted 50 days from mid-July through August and encompassed the major meteorological patterns associated with southwestern US summer meteorology. The MPP emittants were transported towards the Grand Canyon (north to the northeast) during more than 80% of the total hours. Airflow as from the south most of the time due to a combination of the semi-permanent thermal low, differential heating between the Gulf of California and lower Colorado River Valley, and upslope heating of the southern and western slopes of the nearby Colorado Plateau. 14 refs., 12 figs., 2 tabs.

  4. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1996-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  5. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1997-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  6. Compiling Utility Requirements For New Nuclear Power Plant Project

    International Nuclear Information System (INIS)

    Patrakka, Eero

    2002-01-01

    Teollisuuden Voima Oy (TVO) submitted in November 2000 to the Finnish Government an application for a Decision-in-Principle concerning the construction of a new nuclear power plant in Finland. The actual investment decision can be made first after a positive decision has been made by the Government and the Parliament. Parallel to the licensing process, technical preparedness has been upheld so that the procurement process can be commenced without delay, when needed. This includes the definition of requirements for the plant and preliminary preparation of bid inquiry specifications. The core of the technical requirements corresponds to the specifications presented in the European Utility Requirement (EUR) document, compiled by major European electricity producers. Quite naturally, an amount of modifications to the EUR document are needed that take into account the country- and site-specific conditions as well as the experiences gained in the operation of the existing NPP units. Along with the EUR-related requirements concerning the nuclear island and power generation plant, requirements are specified for scope of supply as well as for a variety of issues related to project implementation. (author)

  7. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  8. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  9. Healthier snacks in school vending machines: a pilot project in four Ontario high schools.

    Science.gov (United States)

    Callaghan, Christine; Mandich, Gillian; He, Meizi

    2010-01-01

    The Healthy Vending Machine Pilot Project (HVMPP) was a public health initiative intended to create a healthier school nutrition environment by making healthier snacks available in vending machines, while maintaining a profit margin. The HVMPP was evaluated using quantitative and qualitative measures. Vending machines were stocked with healthier choices and conventional vending products at a 50:50 ratio. The HVMPP was implemented from February to May 2007 in four Ontario secondary schools in Middlesex-London, Elgin, and Oxford counties. Product sales were tracked, and focus groups were conducted to obtain students' opinions about healthy eating and vending choices. "Healthier choice" sales ranged from 14% to 17%. In all schools, vending revenues declined from 0.7% to 66%. A majority of participants had substantial knowledge of healthy eating and were in favour of healthier choices in vending machines; however, price, value, and taste were barriers that led them to purchase these products rarely. Students preferred to have "real" healthy snacks, such as yogurt, fruit, and vegetables, available in schools. Replacing 50% of vending stock with healthier snacks resulted in a decline in vending revenues. Future health programs in schools need to provide "real" healthy snacks, such as low-fat dairy products, fruits, and vegetables.

  10. Project quality management under EPC mode by the owner of nuclear power plant

    International Nuclear Information System (INIS)

    Xu Hui; Hu Miao

    2014-01-01

    As the first completely independent nuclear power project in China, Fangjiashan nuclear power project is constructed under EPC mode of general project contracting. This paper, taking the project as an example, aims to explore how the project owners carry out quality management for the installation project during the construction of the nuclear power plant based on EPC mode. It has certain reference value for the management of following nuclear power projects which adopting the EPC construction mode. It will play a positive role in improving China's overall self-management abilities in the nuclear power construction, and lay a solid foundation for follow-up nuclear power construction in China. (authors)

  11. Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model

    Science.gov (United States)

    Zhao, Erdong; Li, Shangqi

    2017-08-01

    As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.

  12. 76 FR 9340 - Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13995-000] Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 4, 2011, Mill Town Power Project filed an application for a...

  13. Study on the maturity model of nuclear power project management in China

    International Nuclear Information System (INIS)

    Chen Changbing; Li Huiqiang; Zheng Yanguo

    2009-01-01

    Based on the general project management maturity model, this paper discussed the establishment of nuclear power engineering project management maturity model in China, and proposed a basic framework in order to provide a way for improving and evaluating the ability of nuclear power project management in China. (authors)

  14. Superstorm Sandy and the Verdant Power RITE Project

    Science.gov (United States)

    Corren, D.; Colby, J.; Adonizio, M.

    2013-12-01

    On October 29, 2012 Superstorm Sandy (formerly Hurricane Sandy) made landfall in New Jersey. One of the deadliest, and second-costliest hurricane in US history, Sandy was the largest Atlantic hurricane on record, with a diameter of 1,800 km. It was this unprecedented size, extreme central low pressure, and full-moon timing that created a storm surge which inundated New York City with record-breaking water levels, resulting in tremendous destruction of buildings and infrastructure. At its RITE (Roosevelt Island Tidal Energy) Project in New York City's East River, Verdant Power has been installing demonstration and commercial turbine systems since 2005, along with performing related environmental monitoring and measurements. The RITE site is located in the East Channel of the East River, on the east side of Roosevelt Island. All along the East River, large areas of the adjacent boroughs were impacted by Sandy, including flooding of the subway tunnels under the river. When Sandy struck, Verdant had recently concluded a two-week in-water test at RITE of a new rotor for its Gen5 KHPS (Kinetic Hydropower System) turbine, with funding assistance by partners NYSERDA and the US Department of Energy. While the turbine had already been removed from its mounting in the river bottom in September, Verdant continued to operate two water measurement instruments in the river. These acoustic Doppler current profilers (ADCPs) measure the 3-D water velocity at various heights in the water column, and are also equipped to provide water level data. Verdant is interested in the effects such an extreme storm could have on turbines and other equipment installed in this river reach, as is planned by Verdant under a 10-year commercial pilot project licensed by the Federal Energy Regulatory Commission (FERC) for up to 30 turbines. Associated equipment includes navigational aids (buoys and signage), which Verdant is required to maintain to exclude vessels from the project boundaries. The East

  15. UNH Project SMART 2017: Space Science for High School Students

    Science.gov (United States)

    Smith, C. W.; Broad, L.; Goelzer, S.; Levergood, R.; Lugaz, N.; Moebius, E.

    2017-12-01

    Every summer for the past 26 years the University of New Hampshire (UNH) has run a month-long, residential outreach program for high school students considering careers in mathematics, science, or engineering. Space science is one of the modules. Students work directly with UNH faculty performing original work with real spacecraft data and hardware and present the results of that effort at the end of the program. This year the student research projects used data from the Messenger, STEREO, and Triana missions. In addition, the students build and fly a high-altitude balloon payload with instruments of their own construction. Students learn circuit design and construction, microcontroller programming, and core atmospheric and space science along with fundamental concepts in space physics and engineering. Our payload design has evolved significantly since the first flight of a simple rectangular box and now involves a stable descent vehicle that does not require a parachute. Our flight hardware includes an on-board flight control computer, in-flight autonomous control and data acquisition of multiple student-built instruments, and real-time camera images sent to ground. This year we developed, built and flew a successful line cutter based on GPS location information that prevents our payload from falling into the ocean while also separating the payload from the balloon remains for a cleaner descent. We will describe that new line cutter design and implementation along with the shielded Geiger counters that we flew as part of our cosmic ray air shower experiment. This is a program that can be used as a model for other schools to follow and that high schools can initiate. More information can be found at .

  16. Game Development as Students’ Engagement Project in High School Mathematics

    Directory of Open Access Journals (Sweden)

    Ryan V. Dio

    2015-12-01

    Full Text Available The general expectancies of the enhanced basic education curriculum in the Philippines focuses on the performance standards which can be expressed when students are able to produce products as evidence that they can transfer or use their learning in real-life situations. One way to assess students achievement is through an engaging activities that would require them apply the knowledge and skills acquired in the subject as the outcome of their learning. This descriptive method of research employed content analysis procedures and survey in describing and assessing the significant feature of the mathematical games as potential learning devices developed by the high school students through an engaging task assignment. It utilized purposive sampling techniques in the selection of the respondents and the submitted write-ups of mathematical games for analysis as typical sample in this study. The study revealed that the high school students developed mathematical board games with different objectives and mechanics as inspired by their learning, experiences, hobbies, and interest. Mathematical concepts and processes along numbers and number sense, measurements, algebra, geometry, and probability and statistics were integrated in the game through question card and mechanics of the game itself. The groups of students and teachers have high level of agreement as to the workmanship and usability, mechanics and organization, relevance to instruction/learning, and fun and enjoyment of the game as revealed by their assessment from very satisfactory to excellent level. Results implied that teachers in any subject area may use students’ engagement project as teaching strategy to produce products and performance that would provide evidence of students’ learning. The school curriculum makers may consider the students’ output as subjects of research for further improvements, exhibits, and classroom utilization.

  17. Evaluating the High School Lunar Research Projects Program

    Science.gov (United States)

    Shaner, A. J.; Shupla, C.; Shipp, S.; Allen, J.; Kring, D. A.

    2013-01-01

    The Center for Lunar Science and Exploration (CLSE), a collaboration between the Lunar and Planetary Institute and NASA s Johnson Space Center, is one of seven member teams of the NASA Lunar Science Institute (NLSI). In addition to research and exploration activities, the CLSE team is deeply invested in education and outreach. In support of NASA s and NLSI s objective to train the next generation of scientists, CLSE s High School Lunar Research Projects program is a conduit through which high school students can actively participate in lunar science and learn about pathways into scientific careers. The objectives of the program are to enhance 1) student views of the nature of science; 2) student attitudes toward science and science careers; and 3) student knowledge of lunar science. In its first three years, approximately 168 students and 28 teachers from across the United States have participated in the program. Before beginning their research, students undertake Moon 101, a guided-inquiry activity designed to familiarize them with lunar science and exploration. Following Moon 101, and guided by a lunar scientist mentor, teams choose a research topic, ask their own research question, and design their own research approach to direct their investigation. At the conclusion of their research, teams present their results to a panel of lunar scientists. This panel selects four posters to be presented at the annual Lunar Science Forum held at NASA Ames. The top scoring team travels to the forum to present their research in person.

  18. Angra 1 nuclear power plant full scope simulator development project

    Energy Technology Data Exchange (ETDEWEB)

    Selvatici, Edmundo; Castanheira, Luiz Carlos C.; Silva Junior, Nilo Garcia da, E-mail: edsel@eletronuclear.gov.br, E-mail: lccast@eletronuclear.gov.br, E-mail: nilogar@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (SCO/ELETRONUCLEAR), Angra dos Reis, RJ (Brazil). Superintendencia de Coordenacao da Operacao; Zazo, Francisco Javier Lopez; Ruiz, Jose Antonio, E-mail: jlopez@tecnatom.es, E-mail: jaruiz@tecnatom.es [Tecnatom S.A., San Sebastian de los Reyes, Madrid (Spain)

    2015-07-01

    Specific Full Scope Simulators are an essential tool for training NPP control room operators, in the formation phase as well as for maintaining their qualifications. In the last years availability of a Plant specific simulator has also become a Regulator requirement for Nuclear Power Plant operation. By providing real-time practical training for the operators, the use of a simulator allows improving the operator's performance, reducing the number of unplanned shutdowns and more effective response to abnormal and emergency operating conditions. It can also be used, among other uses, to validate procedures, test proposed plant modifications, perform engineering studies and to provide operation training for the technical support staff of the plant. The NPP site, in Angra dos Reis-RJ, Brazil, comprises the two units in operation, Unit 1, 640 MWe, Westinghouse PWR and Unit 2, 1350 MWe, KWU/Areva PWR and one unit in construction, Unit 3, 1405 MWe, KWU/Areva PWR, of the same design of Angra 2. Angra 2 has had its full scope simulator from the beginning, however this was not the case of Angra 1, that had to train its operators abroad, due to lack of a specific simulator. Eletronuclear participated in all the phases of the project, from data supply to commissioning and validation. The Angra 1 full scope simulator encompasses more than 80 systems of the plant including the Primary system, reactor core and associated auxiliary systems, the secondary system and turbo generator as well as all the Plant operational and safety I and C. The Angra 1 Main Control Room panels were reproduced in the simulator control room as well as the remote shutdown panels that are outside the control room. This paper describes the project for development of the Angra 1 NPP Full Scope Simulator, supplied by Tecnatom S.A., in the period of Feb.2012 to Feb.2015. (author)

  19. Angra 1 nuclear power plant full scope simulator development project

    International Nuclear Information System (INIS)

    Selvatici, Edmundo; Castanheira, Luiz Carlos C.; Silva Junior, Nilo Garcia da

    2015-01-01

    Specific Full Scope Simulators are an essential tool for training NPP control room operators, in the formation phase as well as for maintaining their qualifications. In the last years availability of a Plant specific simulator has also become a Regulator requirement for Nuclear Power Plant operation. By providing real-time practical training for the operators, the use of a simulator allows improving the operator's performance, reducing the number of unplanned shutdowns and more effective response to abnormal and emergency operating conditions. It can also be used, among other uses, to validate procedures, test proposed plant modifications, perform engineering studies and to provide operation training for the technical support staff of the plant. The NPP site, in Angra dos Reis-RJ, Brazil, comprises the two units in operation, Unit 1, 640 MWe, Westinghouse PWR and Unit 2, 1350 MWe, KWU/Areva PWR and one unit in construction, Unit 3, 1405 MWe, KWU/Areva PWR, of the same design of Angra 2. Angra 2 has had its full scope simulator from the beginning, however this was not the case of Angra 1, that had to train its operators abroad, due to lack of a specific simulator. Eletronuclear participated in all the phases of the project, from data supply to commissioning and validation. The Angra 1 full scope simulator encompasses more than 80 systems of the plant including the Primary system, reactor core and associated auxiliary systems, the secondary system and turbo generator as well as all the Plant operational and safety I and C. The Angra 1 Main Control Room panels were reproduced in the simulator control room as well as the remote shutdown panels that are outside the control room. This paper describes the project for development of the Angra 1 NPP Full Scope Simulator, supplied by Tecnatom S.A., in the period of Feb.2012 to Feb.2015. (author)

  20. Teens, Power Tools, and Green Schools: Education for Sustainability through a University Environmental Design Program and Middle School Partnership

    Science.gov (United States)

    Derr, Victoria

    2017-01-01

    This article explores the role of green schools in promoting education for sustainability by reflecting on a university-middle school partnership focused on sustainable design. Undergraduates and middle school students met weekly for a semester to learn about sustainability through simple design projects and activities that focused on…

  1. Teacher Views on School Administrators' Organizational Power Sources and Their Change Management Behaviours

    Science.gov (United States)

    Argon, Türkan; Dilekçi, Ümit

    2016-01-01

    This study aimed to determine school administrators' organizational power sources and change management behaviours based on Bolu central district primary and secondary school teachers' views. The study conducted with relational screening model reached 286 teachers. School Administrators' Organizational Power Sources Scale and Change Management…

  2. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  3. Hydro power projects in Pakistan- who pays the price

    International Nuclear Information System (INIS)

    Baig, N.

    2005-01-01

    In this paper an attempt has been made to trace the procedures that have been adopted to arrive at the market value of the assets lost in the construction of Ghazi Barotha Hydro Power Project. There is nothing secret or mysterious about the value of land. It is a commodity commonly dealt with and like every other commodity it. has a price, which can be ascertained within certain limits. This price, however, constantly varies according to the variations of the supply and demand and it is impossible to fix it at any given time with mathematical accuracy. The question of fair compensation is not an algebraic problem, which would be solved by an abstract formula. Compensation must be determined by reference to the price, which a willing vendor might reasonably expect to obtain from a willing purchaser. Although market value cannot be calculated with mathematical precision and a certain amount of conjecture is inevitable, but in valuing one should be careful not to go too far in this direction. (author)

  4. Small and medium power reactors: project initiation study, Phase 1

    International Nuclear Information System (INIS)

    1985-07-01

    In conformity with the Agency's promotional role in the peaceful uses of nuclear energy, IAEA has provided, over the past 20 years, assistance to Member States, particularly developing countries, in planning for the introduction of nuclear power plants in the Small and Medium range (SMPR). However these efforts did not produce any significant results in the market introduction of these reactors, due to various factors. In 1983 the Agency launched a new SMPR Project Initiation Study with the objective of surveying the available designs, examining the major factors influencing the decision-making processes in Developing Countries and thereby arriving at an estimate of the potential market. Two questionnaires were used to obtain information from possible suppliers and prospective buyers. The Nuclear Energy Agency of OECD assisted in making a study of the potential market in industrialized countries. The information gained during the study and discussed during a Technical Committee Meeting on SMPRs held in Vienna in March 1985, along with the contribution by OECD-NEA is embodied in the present report

  5. Effectiveness of the Solar Panels in the Castro Valley Unified School District Based on Projected Amount of Energy to be Produced

    Science.gov (United States)

    Sparks, J. R.; Palmer, T. C.; Siegel, A. P.

    2014-12-01

    In recent years Americans have warmed to the idea of installing solar panels to their homes and businesses. These panels help reduce the cost of receiving energy from power plants that lose a lot of energy in transportation. These power plants provide energy by burning gas or coal producing emissions that add to the growing problem of pollution and global warming. In 2010 the Castro Valley Unified School District decided to add solar panels to Canyon Middle School, Castro Valley High School, and Castro Valley Adult School. We researched whether the solar panels reached their projected amount of energy (74%) for the sites where the panels were placed. The solar panels at all three sites were found to exceed these projected amounts. The solar panels at each site produce a little over 74% for the each school.

  6. Concentrating Solar Power Projects - Planta Solar 20 | Concentrating Solar

    Science.gov (United States)

    Power | NREL 20 This page provides information on Planta Solar 20, a concentrating solar power Solar's Planta Solar 20 (PS20) is a 20-megawatt power tower plant being constructed next to the PS10 tower and increasing incident solar radiation capture will increase net electrical power output by 10

  7. Investigating shadows: a pedagogical intervention project with primary school children

    Science.gov (United States)

    Noversa, Silvana; Abreu, Cátia; Varela, Paulo; Costa, Manuel F. M.

    2014-07-01

    This communication results from a pedagogical intervention project, carried out at a primary school in the district of Braga - Portugal. The intervention took place in a class of the 3rd year, composed of 16 students, and it incorporated the practice of inquiry-based science teaching addressing the theme "Light Experiments", which is part of the "Environmental Studies" curricular area. Various class activities were planned and implemented concerning some of the factors that influence the shadow of an object, in order to find answers to the following three questions: a) will 3rd year students, aged 7/8 years, be able to construct and execute an investigation strategy that involves manipulating and controlling variables? b) what are the main difficulties experienced by students in the designing and execution of such a strategy? c) how will students, in interaction with the teacher and with their peers, gradually design and execute their investigation strategy in order to respond to the problem formulated? The project adopted an action research methodology. A careful record was kept of the events most relevant to the questions under study in each class. This data was used to prepare the class diaries - descriptive and reflective narratives prepared based on recorded audio and field notes made during participant observation in the context of the classroom. A content analysis of the diaries has identified a few elements that provide answers to the research questions raised. In order to plan and implement a research project with children in the 7/8 years old range require a high level of scaffolding to allow students to gradually build a coherent strategy to tackle the research problem. Teacher's role is crucial. The teacher, by questioning and inducing reasoning and discussion, promotes encourages and regulates the cognitive activity of students. Some level of autonomy should be given to the students in large group collaborative work.

  8. Colorado School of Mines Fusion Gamma Ray Project

    International Nuclear Information System (INIS)

    Cecil, F.E.

    1990-01-01

    This report summarizes the activities and accomplishments of the CSM Fusion Gamma Ray Project for the calendar year 1989. As reported in last year's Technical Progress Report, the initial objective of the project was the design and bench testing of an eight channel, very high count rate gamma ray spectrometer. The next objective of the project was the installation and field testing of a comparable fifteen channel spectrometer on TFTR. This objective has been accomplished over the past year and the system has been operated successfully at count rates approaching 10 MHz during neutral beam injected (NBI) deuterium plasmas with injected beam powers in excess of 20 MW. The MFE computer network link between CSM and TFTR has been most valuable in the accomplishment of the year's objectives and should serve as a model for future collaborations of outside researchers with experiments on TFTR and CIT. The coming year's work includes the spectrometry of high energy fusion gamma rays during 3 He minority ICRH heating of deuterium plasmas and hydrogen minority ICRH heating during Lithium pellet injection as diagnostics of energetic alpha particle production. We include in this report selected results from our parallel grant from the DOE Office of High Energy and Nuclear Physics as they pertain to the present APP grant. These results include experimentally derived thermonuclear reactivities of various light ion fusion plasmas for temperatures up to 40 keV. We would emphasize that our APP project is highly collaborative in nature and that Sid Medley and other members of the TFTR staff deserve much of the credit and bore much of the cost for many of the important accomplishments summarized in this report

  9. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  10. Brownfields City of Houston Solar Project: Solar Power Analysis and Design Specifications

    Science.gov (United States)

    This document details the scope of work elements completed in support of this project, as well as recommendations for next steps towards solar project development and power purchase agreement negotiation and finalization.

  11. Development and Validation of a Project Package for Junior Secondary School Basic Science

    Science.gov (United States)

    Udofia, Nsikak-Abasi

    2014-01-01

    This was a Research and Developmental study designed to develop and validate projects for Junior Secondary School Basic Science instruction and evaluation. The projects were developed using the project blueprint and sent for validation by experts in science education and measurement and evaluation; using a project validation scale. They were to…

  12. Brief introduction to project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Chen Jie

    1996-01-01

    The key points in development and engineering project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit are briefly introduced. The Gantt chart, some project management methods and experience are presented. The key points analysis along with the project procedure will be useful to the similar project

  13. Practice and innovation on safety management of Haiyang Nuclear Power Project

    International Nuclear Information System (INIS)

    Wei Guohu

    2011-01-01

    From the perspective of owner, this article has introduced the safety management model and practice of Haiyang Nuclear Power Project, one of AP1000 Self-reliance Program supporting projects of China. And the article has summarized characteristics of the safety management of Haiyang Project for reference and communication with nuclear or other projects. (author)

  14. Chiyoda Thoroughbred CT-121 clean coal project at Georgia Power`s Plant Yates

    Energy Technology Data Exchange (ETDEWEB)

    Burford, D.P. [Southern Company Services, Inc., Birmingham, AL (United States)

    1997-12-31

    The Chiyoda Thoroughbred CT-121 flue gas desulfurization (FGD) process at Georgia Power`s Plant Yates completed a two year demonstration of its capabilities in late 1994 under both high- and low-particulate loading conditions. This $43 million demonstration was co-funded by Southern Company, the Electric Power Research Institute and the DOE under the auspices of the US Department of Energy`s Round II Innovative Clean Coal Technology (ICCT) program. The focus of the Yates Project was to demonstrate several cost-saving modifications to Chiyoda`s already efficient CT-121 process. These modifications included: the extensive use of fiberglass reinforced plastics (FRP) in the construction of the scrubber vessel and other associated vessels, the elimination of flue gas reheat through the use of an FRP wet chimney, and reliable operation without a spare absorber module. This paper focuses on the testing results from the last trimester of the second phase of testing (high-ash loading). Specifically, operation under elevated ash loading conditions, the effects of low- and high-sulfur coal, air toxics verification testing results and unexpected improvements in byproduct gypsum quality are discussed.

  15. Development and application of project management computer system in nuclear power station

    International Nuclear Information System (INIS)

    Chen Junpu

    2000-01-01

    According to the experiences in the construction of Daya Bay and Lingao nuclear power plants presents, the necessity to use the computers for management and their application in the nuclear power engineering project are explained

  16. The appliction of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Tang Zhengrong; Zhang Zhixiong

    2001-01-01

    Concept, history, characteristics of the project management is introduced. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers our study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  17. The application of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Zhang Zhixiong; Tang Zhengrong

    2000-01-01

    The author first presents a brief introduction of the concept, history, characteristics of project management. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers authors' study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  18. Code of Conduct for wind-power projects - Phases 1 and 2

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-08-01

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  19. Pilot project wind power - Large scale wind power in northern Sweden; Pilotprojekt vindkraft - Storskalig vindkraft i norra Sverige

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Swedish Energy Agency granted 2009-04-20 Svevind AB financial aid to implement {sup P}ilot project wind power- Large scale wind power in northern Sweden{sup .} The purpose of the aid is to implement pilot sub-projects in wind power, to to increase knowledge for the larger establishments. The Energy Agency said in its decision that the projects Dragaliden and Gabriel Mountain is of 'great importance for future large-scale development of wind power in Sweden'. The special conditions prevailing in the project, forest environment and cold climate, gives the possibility of studies of wind turbines on birds, reindeer herding and hunting and the more technical aspects, such as de-icing and obstacle lighting. The objectives of the project, in addition to the construction and operation of 32 wind turbines, has been to include evaluating the permit process, studying the social effects around the wind power, to study the impact on small game hunting, perform tests of the de-icing system, investigate impacts on reindeer herding and explain the outcome of the project-generated rural funds. Some of the above sub-projects have been completed, which are reported in this report. For the sub-projects still in progress, the report presents the results to date, until the completion.

  20. Preliminary project concerning the straw-fueled combined power-heat plant to be constructed at Glamsbjerg

    International Nuclear Information System (INIS)

    Gabriel, S.; Koch, T.

    1994-06-01

    Power and heat generation based on biomass gasification is of great importance due to its beneficial environmental effects and good economy. This report concerns a preliminary project on feasibility and problems of implementing a dual-purpose power plant, supplying both power and district heating to several schools, swimming pools and other public facilities at Glamsbjerg (Funen). The plant is to be based on thermal gasification (pyrolysis) of straw and use of the gas in a diesel engine. The diesels operate the power generator, and their waste heat should be utilized in the local district heating network. In order to establish a stable and flexible straw supply to the plant an evaluation of resources in the area has been carried out. Apart from straw-derived fuel the plant is planned to use natural gas for start and maintenance of the process. The prices of the combined plant and of the fuel processing are estimated in the report. (EG)

  1. The Maui's Dolphin Challenge: Lessons from a School-Based Litter Reduction Project

    Science.gov (United States)

    Townrow, Carly S.; Laurence, Nick; Blythe, Charlotte; Long, Jenny; Harré, Niki

    2016-01-01

    The Maui's Dolphin Challenge was a litter reduction project that was run twice at a secondary school in Aotearoa New Zealand. The project drew on a theoretical framework encompassing four psycho-social principles: values, embodied learning, efficacy, and perceived social norms. It challenged students to reduce the litter at the school by offering…

  2. Pathway to Graduation: A Pilot Reading Project for Middle School Students during the Summer Months

    Science.gov (United States)

    Hilsmier, Amanda Strong; Wood, Patricia F.; Wirt, Susan; McTamney, Diane; Malone, Mary Beth; Milstead, Becky

    2014-01-01

    The purpose of this article is to outline the implementation of a summer reading project targeted at middle school students with identified reading deficits and behavioral concerns called Pathway to Graduation (PTG). The project was a collaborative process between a school district, local university, and department of mental health. The students…

  3. A Study on the Evaluation of Science Projects of Primary School Students Based on Scientific Criteria

    Science.gov (United States)

    Gungor, Sema Nur; Ozer, Dilek Zeren; Ozkan, Muhlis

    2013-01-01

    This study re-evaluated 454 science projects that were prepared by primary school students between 2007 and 2011 within the scope of Science Projects Event for Primary School Students. Also, submitted to TUBITAK BIDEB Bursa regional science board by MNE regional work groups in accordance with scientific research methods and techniques, including…

  4. Evaluation of the Family/School Partnership Project, Year III, 1996-97.

    Science.gov (United States)

    Kester, Donald L.; Plakos, John; Santos, Will

    The report details the third-year evaluation of a transitional bilingual education project at Chester W. Nimitz Middle School in Huntington Park, California. The Family/School Partnership Project is designed to assist limited English proficient students in mastering English skills to transition to regular classroom activities by integrating…

  5. Project on School Staff Health Promotion in Poland: The First Experiences

    Science.gov (United States)

    Woynarowska-Soldan, Magdalena

    2015-01-01

    Purpose: The purpose of this paper is to present the concept, methods of implementation, results and experiences from the first stage of the three-year project on school staff health promotion carried out within the framework of the health-promoting school (HPS) network in Poland. Design/methodology/approach: The project was implemented in 2012 in…

  6. Stakeholders' Opinions on "Let the Schools Become Life" Project in Scope of Lifelong Learning Activities

    Science.gov (United States)

    Karatas, Süleyman

    2015-01-01

    The objective of this study is to find out the opinions of school administrators, teachers, staff, benefiting students and parents and other stakeholders of "Let the Schools Become Life" project being carried out in order to reveal the effectiveness and efficiency of the project. Data in this qualitative research was gathered by…

  7. Implementation of a Project-Based Engineering School: Increasing Student Motivation and Relevant Learning

    Science.gov (United States)

    Terrón-López, María-José; García-García, María-José; Velasco-Quintana, Paloma-Julia; Ocampo, Jared; Vigil Montaño, María-Reyes; Gaya-López, María-Cruz

    2017-01-01

    The School of Engineering at Universidad Europea de Madrid (UEM) implemented, starting in the 2012-2013 period, a unified academic model based on project-based learning as the methodology used throughout the entire School. This model expects that every year, in each grade, all the students should participate in a capstone project integrating the…

  8. Students' Perceptions of Life Skill Development in Project-Based Learning Schools

    Science.gov (United States)

    Meyer, Kimberly; Wurdinger, Scott

    2016-01-01

    This research aimed to examine students' perceptions of their life skills while attending project-based learning (PBL) schools. The study focused on three questions including: (1) What are students' perceptions of their development of life skills in project-based learning schools?; (2) In what ways, if any, do students perceive an increase in…

  9. An Agile Constructionist Mentoring Methodology for Software Projects in the High School

    Science.gov (United States)

    Meerbaum-Salant, Orni; Hazzan, Orit

    2010-01-01

    This article describes the construction process and evaluation of the Agile Constructionist Mentoring Methodology (ACMM), a mentoring method for guiding software development projects in the high school. The need for such a methodology has arisen due to the complexity of mentoring software project development in the high school. We introduce the…

  10. A World of Learning: Practical Manual. Enhancing the Multiplier Effect of the Associated Schools Project.

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    This manual presents the major lessons learned about how national authorities, individual institutions, and individual educators can work to increase the impact of the Associated Schools Project (ASP) schools and spread it to other parts of the educational system. ASP is a project of the United Nations Educational, Scientific and Cultural…

  11. Evaluation Tool for the Application of Discovery Teaching Method in the Greek Environmental School Projects

    Science.gov (United States)

    Kalathaki, Maria

    2015-01-01

    Greek school community emphasizes on the discovery direction of teaching methodology in the school Environmental Education (EE) in order to promote Education for the Sustainable Development (ESD). In ESD school projects the used methodology is experiential teamwork for inquiry based learning. The proposed tool checks whether and how a school…

  12. Fuel supply strategy for power projects in Asia

    International Nuclear Information System (INIS)

    Boyd, D.

    1997-01-01

    Electricity generation is forecast to grow in Asia over the next twenty years. This will bring with it a significant growth in demand for energy resources. Major Asian utility coal procurement strategy to date has aimed at securing a balance between two conflicting needs - security of supply and low cost of supply. Despite the oversupply of coal in the eighties, the two countries experiencing significant growth in demand, Japan and Korea, planned their fuel strategies to ensure security of supply. The supply shortage over the past two years has justified their forward thinking in keeping long term coal contracts in place. Changes are already happening. Recent developments are seeing a move towards the positive attributes of low ash/low sulphur coals appropriately focusing suppliers thoughts on the need in the future to develop and concentrate on environmentally attractive coals to achieve greater returns. Indeed, generally there is a trend in North Asia to demand coal with lower sulphur, and lower ash. The aim now should be to persuade consumers to amend the narrow benchmark view in favour of one that considers the value in use of a particular coal to the customer. The method of pricing thermal coals is also likely to be influenced by the liberalization of the electricity market itself. The introduction of competition amongst generators and the appearance and growth of the Independent Power Producers could well see further pressure on the current simplistic benchmark system. Those financing such projects will seek to reduce risk by every means possible and, in particular, will want to be confident of the long term security of coal supplies

  13. BACA Project: geothermal demonstration power plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  14. Economic-financial analysis of 'Angra 3 Nuclear Power Plant' project

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2005-01-01

    This paper presents an economic-financial evaluation of 'Angra 3 Nuclear Power Plant' project and estimates the lowest power tariff value at which power potentially made available may be commercialized and yet ensure the project a profitability level agreeable to the interests of economic agents and shareholders. According to the 'project evaluation' practice, Angra 3 power generation was considered separately from ELETRONUCLEAR's operating plants (Angra 1 and Angra 2), thus preventing result distortions bound to occur if the economic-financial variables of the new project were analyzed associated with financial commitments and commercialization conditions resulting from the project implementation process and the generated power commercialization conditions, respectively. For this evaluation different technical and economic scenarios were devised, and the theory of Capital Asset Pricing Model for Own Capital cost and that of Weighted Average Cost of Capital were used in addition to the forecast of the Statement of Results and Free Cash flow of Shareholders throughout the power plant life, which is the estimate basis for the lowest power tariff value and the Internal Return Rate of the project. The evaluation conclusion is that Angra 3 project is technically and economically feasible and competitive as compared to the new large power generation projects planned for power supply in Brazil in the next decade, mainly in the Southeast. (author)

  15. High School Geography Project. Legacy for the Seventies. An Analysis of the High School Geography Project in Relation to New Developments in Geographic Education Worldwide.

    Science.gov (United States)

    Gunn, Angus M., Ed.

    Nine articles by geographers and educators analyze the High School Geography Project (HSGP). A project overview by Angus Gunn presents essential ideas and content of six units and several preliminary reactions. The question of "HSGP exportability" to France and Germany is examined in articles by Maurice Saint-Yves and Robert Geipel…

  16. The Philippine nuclear power project, its past, present and future

    International Nuclear Information System (INIS)

    Jovellanos, J.U.

    1993-01-01

    The article discussed the historical background of the nuclear power plants; how it operates; the government opinion on the operation of the nuclear power plant; the application of power resources to industry; the implementation of PNPP-1 particularly the economic aspects of energy in the near future. (IMA)

  17. Charting a Path to Graduation. The Effect of Project GRAD on Elementary School Student Outcomes in Four Urban School Districts

    Science.gov (United States)

    Snipes, Jason C.; Holton, Glee Ivory; Doolittle, Fred

    2006-01-01

    In the past decade, school districts around the country have sought to improve struggling urban high schools, where high dropout rates, poor student achievement, and low rates of graduation and college-going remain all too prevalent. In a field crowded with reform initiatives, Project Graduation Really Achieves Dreams (GRAD) stands out as…

  18. High School Principals and School Reform: Lessons Learned from a Statewide Study of Project Re:Learning.

    Science.gov (United States)

    Anderson, Lorin W.; Shirley, J. Robert

    1995-01-01

    Summarizes a study examining the high school principal's role in providing the leadership needed to explore and implement Project Re:Learning. The 4-phase study initially included 15 schools and involved questionnaires, interviews, and shadowing. Identifies six types of administrators: the absent administrator, the pawn, the pragmatic principal,…

  19. Project considerations and design of systems for wheeling cogenerated power

    Energy Technology Data Exchange (ETDEWEB)

    Tessmer, R.G. Jr.; Boyle, J.R.; Fish, J.H. III; Martin, W.A.

    1994-08-01

    Wheeling electric power, the transmission of electricity not owned by an electric utility over its transmission lines, is a term not generally recognized outside the electric utility industry. Investigation of the term`s origin is intriguing. For centuries, wheel has been used to describe an entire machine, not just individual wheels within a machine. Thus we have waterwheel, spinning wheel, potter`s wheel and, for an automobile, wheels. Wheel as a verb connotes transmission or modification of forces and motion in machinery. With the advent of an understanding of electricity, use of the word wheel was extended to be transmission of electric power as well as mechanical power. Today, use of the term wheeling electric power is restricted to utility transmission of power that it doesn`t own. Cogeneration refers to simultaneous production of electric and thermal power from an energy source. This is more efficient than separate production of electricity and thermal power and, in many instances, less expensive.

  20. Project finance and photovoltaic power plants : a theoretical and practical perspective

    OpenAIRE

    Aasgaard, Anne Kristine

    2010-01-01

    Project finance is a defined structure for developing new activity which involves establishing the project as a separate unit. The review of literature exhibits the distinctive characteristics of project finance and provides a rationale of this form of financing. Project finance entails financial modelling, risk management, legal aspects and the creation of a financial structure. The thesis explores practical use of project finance in a case study of a photovoltaic power plant and presents a ...

  1. CAS CERN Accelerator School: Power converters for particle accelerators

    International Nuclear Information System (INIS)

    Turner, S.

    1990-01-01

    This volume presents the proceedings of the fifth specialized course organized by the CERN Accelerator School, the subject on this occasion being power converters for particle accelerators. The course started with lectures on the classification and topologies of converters and on the guidelines for achieving high performance. It then went on to cover the more detailed aspects of feedback theory, simulation, measurements, components, remote control, fault diagnosis and equipment protection as well as systems and grid-related problems. The important topics of converter specification, procurement contract management and the likely future developments in semiconductor components were also covered. Although the course was principally directed towards DC and slow-pulsed supplies, lectures were added on fast converters and resonant excitation. Finally the programme was rounded off with three seminars on the related fields of Tokamak converters, battery energy storage for electric vehicles, and the control of shaft generators in ships. (orig.)

  2. Streaking into middle school science: The Dell Streak pilot project

    Science.gov (United States)

    Austin, Susan Eudy

    A case study is conducted implementing the Dell Streak seven-inch android device into eighth grade science classes of one teacher in a rural middle school in the Piedmont region of North Carolina. The purpose of the study is to determine if the use of the Dell Streaks would increase student achievement on standardized subject testing, if the Streak could be used as an effective instructional tool, and if it could be considered an effective instructional resource for reviewing and preparing for the science assessments. A mixed method research design was used for the study to analyze both quantitative and qualitative results to determine if the Dell Streaks' utilization could achieve the following: 1. instructional strategies would change, 2. it would be an effective instructional tool, and 3. a comparison of the students' test scores and benchmark assessments' scores would provide statistically significant difference. Through the use of an ANOVA it was determined a statistically significant difference had occurred. A Post Hoc analysis was conducted to identify where the difference occurred. Finally a T-test determined was there was no statistically significance difference between the mean End-of-Grade tests and four quarterly benchmark scores of the control and the experimental groups. Qualitative research methods were used to gather results to determine if the Streaks were an effective instructional tool. Classroom observations identified that the teacher's teaching styles and new instructional strategies were implemented throughout the pilot project. Students had an opportunity to complete a questionnaire three times during the pilot project. Results revealed what the students liked about using the devices and the challenges they were facing. The teacher completed a reflective questionnaire throughout the pilot project and offered valuable reflections about the use of the devices in an educational setting. The reflection data supporting the case study was drawn

  3. Evaluating the High School Lunar Research Projects Program

    Science.gov (United States)

    Shaner, A. J.; Shipp, S. S.; Allen, J.; Kring, D. A.

    2012-12-01

    The Center for Lunar Science and Exploration (CLSE), a collaboration between the Lunar and Planetary Institute and NASA's Johnson Space Center, is one of seven member teams of the NASA Lunar Science Institute (NLSI). In addition to research and exploration activities, the CLSE team is deeply invested in education and outreach. In support of NASA's and NLSI's objective to train the next generation of scientists, CLSE's High School Lunar Research Projects program is a conduit through which high school students can actively participate in lunar science and learn about pathways into scientific careers. The objectives of the program are to enhance 1) student views of the nature of science; 2) student attitudes toward science and science careers; and 3) student knowledge of lunar science. In its first three years, approximately 140 students and 28 teachers from across the United States have participated in the program. Before beginning their research, students undertake Moon 101, a guided-inquiry activity designed to familiarize them with lunar science and exploration. Following Moon 101, and guided by a lunar scientist mentor, teams choose a research topic, ask their own research question, and design their own research approach to direct their investigation. At the conclusion of their research, teams present their results to a panel of lunar scientists. This panel selects four posters to be presented at the annual Lunar Science Forum held at NASA Ames. The top scoring team travels to the forum to present their research. Three instruments have been developed or modified to evaluate the extent to which the High School Lunar Research Projects meets its objectives. These three instruments measure changes in student views of the nature of science, attitudes towards science and science careers, and knowledge of lunar science. Exit surveys for teachers, students, and mentors were also developed to elicit general feedback about the program and its impact. The nature of science

  4. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  5. Siting and early-stage project management of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Kai; Li Guojin

    2013-01-01

    In this paper, difficulties and challenges facing in siting of nuclear power plant after Fukushima nuclear accident is introduced. The key points for siting are analyzed. The site characteristics related to nuclear safety and the evaluated methods are discussed. From project management perspective, main procedures and key points for the early-stage of a nuclear power project are described. (authors)

  6. Research on quality assurance classification methodology for domestic AP1000 nuclear power projects

    International Nuclear Information System (INIS)

    Bai Jinhua; Jiang Huijie; Li Jingyan

    2012-01-01

    To meet the quality assurance classification requirements of domestic nuclear safety codes and standards, this paper analyzes the quality assurance classification methodology of domestic AP1000 nuclear power projects at present, and proposes the quality assurance classification methodology for subsequent AP1000 nuclear power projects. (authors)

  7. Bulk material management mode of general contractors in nuclear power project

    International Nuclear Information System (INIS)

    Zhang Jinyong; Zhao Xiaobo

    2011-01-01

    The paper introduces the characteristics of bulk material management mode in construction project, and the advantages and disadvantages of bulk material management mode of general contractors in nuclear power project. In combination with the bulk material management mode of China Nuclear Power Engineering Co., Ltd, some improvement measures have been put forward as well. (authors)

  8. Power and contexts – some societal conditions for participatory projects

    DEFF Research Database (Denmark)

    Bloch-Poulsen, Jørgen; Kristiansen, Marianne

    2014-01-01

    Based on action research co-operation with a team of teachers at a Social and Healthcare College in Denmark 2012-2013, the article raises the question: What are the conditions for organisational action research projects in a neoliberal context? The article has three purposes. Firstly, we want...... to show that mapping and delimitating relevant contexts are critical in an organisational AR project, because it is always arbitrary what you delimit as your field of inquiry, initially. The consequences of ignoring this in the project described were fatal. Secondly, the article draws attention to clashes...... with immediate and additional stakeholders questioning, among others, if the action research project is practicable at all....

  9. "KiDS and Diabetes in Schools" project: Experience with an international educational intervention among parents and school professionals.

    Science.gov (United States)

    Bechara, Glaucia Margonari; Castelo Branco, Fernanda; Rodrigues, Avelino Luiz; Chinnici, Daniela; Chaney, David; Calliari, Luis Eduardo P; Franco, Denise Reis

    2018-06-01

    Although it is known that school care is a major challenge in diabetes treatment, there is still no published international initiative. The aims of this study were to introduce an international educational intervention tool, the International Diabetes Federation (IDF) KiDS and Diabetes in Schools project (KiDS project), and to describe its impact on diabetes knowledge and behavior of caregivers and school professionals. The KiDS project was developed with the support of IDF and the International Society for Pediatric and Adolescent Diabetes and provides online free material in 10 languages, directed to caregivers and school personnel. A pilot evaluation of the KiDS intervention was performed in Brazil. An educational intervention was conducted in 5 primary schools, with 42 parents and school staff, followed by 2 individual interviews after 1 and 3 months. The results were evaluated in a qualitative study with a descriptive design based on content analysis. School staff acquired new knowledge on diabetes and its treatment. They felt more confident when helping students with diabetes and said the educational intervention promoted a positive impact on the teacher-student relationship, on the caring for health, and on school infrastructure. Family members of children with diabetes stated that the educational intervention gave them an opportunity to strengthen and update information on treatment and improve their knowledge. The KiDS project is the first international tool directed to foster a safe and supportive environment and a better understanding of diabetes in schools. In this pilot evaluation, it achieved the goal of informing and changing the behavior of parents and school staff, thus improving the care provided to children with diabetes in schools. © 2018 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  10. SRT project: tele-robotics maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Gomez-Santamaria, J.; Calleja, J.M.; Carmena, P.; Avello, A.; Rubio, Y.A.

    2001-01-01

    The main aim of the SRT project was to develop a family of robots to help in the operation of nuclear power plants. Four robotic systems were developed and this paper focuses on three of them: ANAES -a steam leak detector through noise analysis-, MALIBA -a master-slave tele-operation system with force feedback- and ROBICEN -a compact pneumatic wall climbing robot-. ANAES (the Spanish acronym of spectrum analysis) consists of a set of sensor heads attached to a computer. Each head has two microphones and a video camera installed on it, and a DC motor that rotates the head. The heads are shielded with lead and boron steel, especially near the video camera. The noise generated by the plant is recorded every day at the same time and the software compares the recorded noise with the mean values of past records. The system can discern whether the noise has remarkably changed and, through phase analysis of the sound recorded by both microphones, identifies the direction of arrival (DOA) of the new noise, probably a steam leak. Using several heads, the new noise source can be identified. The video camera can be used to ease the location of the steam leaks. The stationariness of the measured noise has been tested in C.N. Cofrentes -a Spanish BWR-6 reactor-. A finished system with six heads has recently been installed in the MSR (moisture separator reheater) of the same plant. MALIBA is a master-slave tele-operated system with force feedback. It consists of two robots: a Stewart platform used as master robot and an open chain robot used as slave. The slave robot follows faithfully the movements of the master, and the master robot can reflect a force proportional to the force exerted by the slave on the environment. Three tools have been developed for the slave robot: a robot hand that includes a small video camera, a pneumatic drill and a rectifier. The results obtained have shown its effectiveness for the designed operations. ROBICEN is a lightweight pneumatic robot

  11. SRT project: tele-robotics maintenance of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Gomez-Santamaria, J. [Iberdrola SA, Madrid (Spain); Calleja, J.M.; Carmena, P. [Endesa, Madrid (Spain); Avello, A.; Rubio, Y.A. [CEIT-Centro de Estudias e Investigaciones Tecnicas de Guipuzcoa, San Sebastian (Spain)

    2001-07-01

    The main aim of the SRT project was to develop a family of robots to help in the operation of nuclear power plants. Four robotic systems were developed and this paper focuses on three of them: ANAES -a steam leak detector through noise analysis-, MALIBA -a master-slave tele-operation system with force feedback- and ROBICEN -a compact pneumatic wall climbing robot-. ANAES (the Spanish acronym of spectrum analysis) consists of a set of sensor heads attached to a computer. Each head has two microphones and a video camera installed on it, and a DC motor that rotates the head. The heads are shielded with lead and boron steel, especially near the video camera. The noise generated by the plant is recorded every day at the same time and the software compares the recorded noise with the mean values of past records. The system can discern whether the noise has remarkably changed and, through phase analysis of the sound recorded by both microphones, identifies the direction of arrival (DOA) of the new noise, probably a steam leak. Using several heads, the new noise source can be identified. The video camera can be used to ease the location of the steam leaks. The stationariness of the measured noise has been tested in C.N. Cofrentes -a Spanish BWR-6 reactor-. A finished system with six heads has recently been installed in the MSR (moisture separator reheater) of the same plant. MALIBA is a master-slave tele-operated system with force feedback. It consists of two robots: a Stewart platform used as master robot and an open chain robot used as slave. The slave robot follows faithfully the movements of the master, and the master robot can reflect a force proportional to the force exerted by the slave on the environment. Three tools have been developed for the slave robot: a robot hand that includes a small video camera, a pneumatic drill and a rectifier. The results obtained have shown its effectiveness for the designed operations. ROBICEN is a lightweight pneumatic robot

  12. UCH-II, private power project, Dera Murad Jamali, Pakistan. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    Energy Resources International and Power Development Company of Pakistan in association with General Electric Corporation, Inc. offers to build, finance, own and operate a 500+ MW combined cycle natural gas electric power plant, near Dera Murad Jamali, Pakistan. The basis for the undertaking is a carefully balanced and integrated series of contracts for fuel, power purchase, and implementation of the proposed project. The contracts would be established between the Government of Pakistan (GOP), its agencies and instrumentalities, Energy Resources International with Power Development Company and its associates, and a Project Company organized specifically for the undertaking. The report describes the project.

  13. Status of the project of Novosibirsk high power FEL

    Energy Technology Data Exchange (ETDEWEB)

    Pinayev, I.V.; Erg, G.I.; Gavrilov, N.G. [Budker Institute of Nuclear Physics, Novosibirsk (Russian Federation)] [and others

    1995-12-31

    The project of IR FEL for the Siberian Center of photochemical researches is described. The distinguished features of this project are the use of the race-track microtron-recuperator and the {open_quotes}electron output of radiation{close_quotes}. The building for the machine is under reconstruction now. About half of hardware has been manufactured. The assembly of installation began.

  14. The Study on quality control of nuclear power installation project

    International Nuclear Information System (INIS)

    Wu Jie

    2008-01-01

    The quality planning, quality assurance and quality control are discussed by applying the quality control (QC) theory and combining the real situation of the Qinshan II project. This paper is practical and plays an active role in instruction of project quality control by applying the above QC theory and control techniques. (authors)

  15. Educational project for the nuclear power and nuclear waste public acceptance fostering

    International Nuclear Information System (INIS)

    Constantin, M.; Diaconu, Daniela

    2005-01-01

    Full text: Until now, public acceptance of nuclear power in Romania can be assessed as good. The main motivations could be: the primacy effect of the information, the poverty, the absence of the interest, the relative low informing level. However we expect important changes in the near future: more active NGOs with anti-nuclear opinion, the public's awareness will be more important, serious opposition against the continuation of the nuclear development may appear followed by a reformulation of the Romanian ecologists ideas. The problem of radioactive nuclear wastes (RNW) is the most sensitive and, related to the public opinion, we expect it will become crucial in 10-15 years. The main assumption of our project is that children who are now in schools will be tomorrow's decision makers on 'nuclear energy and RNW. Thus, we intend to prepare the young generation for the future participation in the decision making process related to RNW. The paper shows the main ideas (initial conditions obtained by actual knowledge level measurements, constraints, methods, information contents, evaluation methods and produced outputs) of the educational proposed programme. The work is part of the Romanian contribution to COWAM FP6 project. (authors)

  16. The Planning, Implementation and Evaluation of a Character-Based School Culture Project in Taiwan

    Science.gov (United States)

    Lee, Chi-Ming

    2009-01-01

    This study focused on the planning, implementation and evaluation of a character-based school culture (CBSC) project in Taiwan. The project integrated the principles of justice, caring and developmental discipline and was influenced by several well-known American models of character education programmes. The CBSC project was conducted in a…

  17. Urban High School Student Engagement through CincySTEM iTEST Projects

    Science.gov (United States)

    Beckett, Gulbahar H.; Hemmings, Annette; Maltbie, Catherine; Wright, Kathy; Sherman, Melissa; Sersion, Brian

    2016-01-01

    This paper focuses on the notable heightening of underrepresented students' engagement in STEM education through project-based learning CincySTEM iTEST projects. The projects, funded by an iTEST NSF grant, were designed and facilitated by teachers at a new STEM urban public high school serving low-income African-American students. Student…

  18. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    OpenAIRE

    Febijanto, Irhan

    2013-01-01

    Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from ...

  19. The Research of Stakeholder Power Impact on Project Implementation

    Directory of Open Access Journals (Sweden)

    Artur Biskupek

    2016-12-01

    Full Text Available Purpose of the article: The article show summarized information about stakeholders and their role in project implementation based on literature review. The second part of the article is dedicated for the research about stakeholder influence on project implementation. The only condition to participate in the survey was managing projects. Although the respondents are employed in the area of south Poland, they implement projects all over Poland. The research tool was a questionnaire which was sent by e-mail to the respondents. 90 project managers from the area of south Poland were invited to join the project, and 62 people sent back a completed questionnaire. Methodology/methods: The research was done by a questionnaire with twenty two question, which was divided into three parts. The first part was the imprint, which consisted of three questions. The second part consisted of two questions, which concerned the way of defining the word “stakeholder”. The third part concerned the topic of the research and consisted of seventeen questions. Scientific aim: The aim of the article is presenting the results of the research which was done, to show the research results of project stakeholder influence on the project implementation. Findings: The results received from the survey in the process of analysis and interpretation allow to put forward a thesis that stakeholders as a whole group are significant for the implementation of the whole project. Their impact is so important that it is possible to tell that they decide also about the project success or failure. Conclusions: The respondents show that stakeholders affect every area in large extent or very big extent. The fact has been proved in table 1 which shows the most frequently chosen answers by responders. However, by conducted analysis by the standard deviation it is possible to see a large dispersion of the results.

  20. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  1. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  2. Summary evaluation e-NV200 'Power to Amsterdam' project : February - June 2015

    NARCIS (Netherlands)

    Balm, Susanne; Spoelstra, Jop; van Holstein, Leigh; Moser, Thijs; van Kollem, Wouter

    2015-01-01

    In the Netherlands, the automobile manufacturer Nissan has initiated a unique project to stimulate the uptake of electric vehicles (EV) for commercial usage. This project is called “Power to Amsterdam” and started by the end of 2014. In the project, Nissan has enabled entrepreneurs in the region of

  3. Discussion on organization structure system of nuclear power projects in China

    International Nuclear Information System (INIS)

    Wang Zhi

    2011-01-01

    With the development of the nuclear power industry in China, several AE companies were born and now play a major role in building nuclear power projects in China and overseas. After studying current organization structure systems of all nuclear power AE companies in China and comparing with successful foreign ones, this paper proposes some approaches to optimize the structure. (author)

  4. A simulation of 'schedule-cost' progress monitoring system in nuclear power project management

    International Nuclear Information System (INIS)

    Song Haitao; Huang Zhongping; Zhang Zemin; Wang Zikai

    2010-01-01

    The objective of project management is to find the optimal balance between progress and cost according to the project requirements. Traditional method always manages progress and cost separately. However, domestic and international experience indicated that the interactions between these two factors are crucial in the project implementation. Modern project managers have to manage and maintain a 'Progress - Cost' joint control framework. Such a model is applied into a sub-project of a nuclear power project using Simulink in this paper. It helps to identify and correct the deviations of the project. Earned Value Management is used by the project manager to quantify the cost of the project and progress of implementation. The budget plan value, actual value, earned value are three important parameters to measure cost and progress of the project. The experimental results illustrated that the method gives a more comprehensive performance evaluation of the project. (authors)

  5. Humanizing the High School: The Power of Peers.

    Science.gov (United States)

    Stader, David L.; Gagnepain, F. J.

    2000-01-01

    Discusses what high schools can do to improve student relationships, highlighting a St. Louis area school's efforts to develop peer-mentoring and peer-mediation programs. Offers guidelines to help other schools develop a school culture that promotes caring, teaches constructive conflict resolution, and reduces potential for violence. (MLH)

  6. The Influence of Gender on the Likelihood of Using Soft Social Power Strategies in School Consultation

    Science.gov (United States)

    Getty, Kimberly C.; Erchul, William P.

    2009-01-01

    The social power typology developed originally by French and Raven in 1959 and revised by Raven in 1965 and 1992 was applied to study school consultation. Specifically, we investigated how the gender of school psychologist consultants and teacher consultees influence how likely consultants are to use soft power strategies, identified as those…

  7. "I Wish Everyone Had a Library Like This": Year 2 Report on the Baltimore Elementary and Middle School Library Project

    Science.gov (United States)

    Sheldon, Steven B.; Davis, Marcia H.

    2015-01-01

    This report focuses on the opening of new school libraries and their impact on schools, teachers and students after two years of implementation of the Baltimore Elementary and Middle School Library Project (Library Project). The findings build on the first report of this project and show that it is not just new facilities, but also the added…

  8. El Proyecto School on the Cloud: Lecciones Aprendidas = School on the Cloud Project: Lessons Learned

    Directory of Open Access Journals (Sweden)

    María Luisa de Lázaro y Torres

    2017-06-01

    Full Text Available School on the Cloud es un Proyecto europeo Acción Clave 3 del programa de Aprendizaje Permanente de la UE. En sus tres años de andadura ha evidenciado la potencialidad del empleo de la nube para el aprendizaje en todos los niveles educativos con la finalidad de llamar la atención a los agentes responsables de la educación en Europa sobre ello. Diversas actividades y resultados de investigación han permitido llegar a esa conclusión, para cuya consecución se proponen algunas medidas concretas, como por ejemplo, una estrategia europea para la educación en la nube.School on the Cloud is a European Erasmus+ project Key Action 3 of the EU Lifelong Learning program. The experience of three years has proven the potential use of the cloud for learning at all educational levels. We aim to draw stakeholders’ attention to the subject of education in Europe. A number of activities and research results have made it possible to reach this conclusion. Concrete measures to improve this type of learning have been proposed, such as a European strategy for education on the cloud.

  9. 77 FR 50493 - Sam Rayburn Dam Project Power Rate

    Science.gov (United States)

    2012-08-21

    ... 20, 2012. FOR FURTHER INFORMATION CONTACT: Mr. James K. McDonald, Assistant Administrator..., (918) 595-6690, jim.mcdonald@swpa.gov . SUPPLEMENTARY INFORMATION: Originally established by... Marketing Administration Financial Reporting. Procedures for Public Participation in Power and Transmission...

  10. Method for assigning sites to projected generic nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Holter, G.M.; Purcell, W.L.; Shutz, M.E.; Young, J.R.

    1986-07-01

    Pacific Northwest Laboratory developed a method for forecasting potential locations and startup sequences of nuclear power plants that will be required in the future but have not yet been specifically identified by electric utilities. Use of the method results in numerical ratings for potential nuclear power plant sites located in each of the 10 federal energy regions. The rating for each potential site is obtained from numerical factors assigned to each of 5 primary siting characteristics: (1) cooling water availability, (2) site land area, (3) power transmission land area, (4) proximity to metropolitan areas, and (5) utility plans for the site. The sequence of plant startups in each federal energy region is obtained by use of the numerical ratings and the forecasts of generic nuclear power plant startups obtained from the EIA Middle Case electricity forecast. Sites are assigned to generic plants in chronological order according to startup date.

  11. KiloPower Project - KRUSTY Experiment Nuclear Design

    Energy Technology Data Exchange (ETDEWEB)

    Poston, David Irvin [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Godfroy, Thomas [NASA Marshall Space Flight Center (MSFC), Huntsville, AL (United States); Mcclure, Patrick Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Sanchez, Rene Gerardo [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-20

    This PowerPoint presentation covers the following topics: Reference Kilopower configuration; Reference KRUSTY configuration; KRUSTY design sensitivities; KRUSTY reactivity coefficients; KRUSTY criticality safety and control; KRUSTY core activation/dose; and KRUSTY shielding, room activation/dose.

  12. Method for assigning sites to projected generic nuclear power plants

    International Nuclear Information System (INIS)

    Holter, G.M.; Purcell, W.L.; Shutz, M.E.; Young, J.R.

    1986-07-01

    Pacific Northwest Laboratory developed a method for forecasting potential locations and startup sequences of nuclear power plants that will be required in the future but have not yet been specifically identified by electric utilities. Use of the method results in numerical ratings for potential nuclear power plant sites located in each of the 10 federal energy regions. The rating for each potential site is obtained from numerical factors assigned to each of 5 primary siting characteristics: (1) cooling water availability, (2) site land area, (3) power transmission land area, (4) proximity to metropolitan areas, and (5) utility plans for the site. The sequence of plant startups in each federal energy region is obtained by use of the numerical ratings and the forecasts of generic nuclear power plant startups obtained from the EIA Middle Case electricity forecast. Sites are assigned to generic plants in chronological order according to startup date

  13. Comprehensive report to Congress, Clean Coal Technology program: Pinon Pine IGCC Power Project

    International Nuclear Information System (INIS)

    1992-06-01

    The objective of the proposed project is to demonstrate an advanced IGCC system based upon the air-blown, fluidized-bed KRW gasifier with in-bed desulfurization using limestone sorbent and an external fixed- bed zinc ferrite sulfur removal system. Sierra Pacific Power Company (SPPC) requested financial assistance from DOE for the design, construction, and operation of a nominal 800 ton-per-day (86-Megawatt gross), air blown integrated gasification combined-cycle (IGCC) demonstration plant. The project, named the Pinon Pine IGCC Power Project, is to be located at SPPC's Tracy Station, a power generation facility located on a rural 400-acre plot about 17 miles east of Reno. The demonstration plant will produce electrical power for the utility grid. The project, including the demonstration phase, will last 96 months at a total cost of $269,993,100. DOE's share of the project cost will be 50 percent, or $134,996,550

  14. Summary of EPRI projects for improving power plant maintenance and maintainability

    International Nuclear Information System (INIS)

    Shugars, H.G.; Poole, D.N.; Pack, R.W.

    1979-01-01

    The Electric Power Research Institute is sponsoring projects to improve power plant maintenance and maintainability. Areas presently being emphasized are improvements in plant design for maintainability, improvements in performing nuclear plant refuelings, and development of on-line monitoring and diagnostic systems for various plant components. The seven projects are reviewed. They are: (1) human factors review of power plant maintainability; (2) refueling outage improvement; (3) on-line monitoring and diagnostics for power plant machinery; (4) acoustic emission and vibrati1on signature analysis of fossil fuel plant components; (5) acoustic monitoring of power plant valves; (6) on-line monitoring and diagnostics for generators; and (7) detection of water induction in steam turbines. Each project contractor and the project manager are listed for reference. 8 references

  15. The pedagogical and ethical legacy of a "successful" educational reform: The Citizen School Project

    Science.gov (United States)

    Fischman, Gustavo E.; Gandin, Luis Armando

    2016-02-01

    The Citizen School Project (Escola Cidadã) was implemented from 1993 to 2004 in Porto Alegre, capital of the Brazilian state of Rio Grande do Sul. This article presents the conception behind the Citizen School Project, the basic mechanisms created to implement and evaluate its strengths and weaknesses, and some of its contradictions. After contextualising the educational reforms in Brazil during the 1980s and 1990s, the authors demonstrate how the Citizen School Project's emphasis on participation and democratisation was a radical departure from Brazil's traditional public education system. Next, they present the three main goals and structures of the Citizen School Project - democratisation of access to schools, democratisation of schools' administration, and democratisation of access to knowledge. They conclude by discussing some pedagogic, social and political dynamics which appear to be strong legacies of this pedagogical project. The authors also argue that the Citizen School Project has both improved the quality of education in Porto Alegre and is an important contribution to our collective thinking about the politics of "successful" educational policies.

  16. A canteen for the Nursery School A project for CERN

    CERN Document Server

    Association du personnel

    2007-01-01

    For a number of years a minimum service has been offered at lunchtime between 12.15 and 13.30 for children enrolled for the full day at the CERN Nursery School. This service is provided by qualified staff at the Nursery School, on the premises, the meals being supplied by the parents.

  17. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  18. Implementation of municipal health promoting projects in primary schools: teachers perspective

    DEFF Research Database (Denmark)

    Nordin, Lone Lindegard

    2013-01-01

    . The project is funded by the Danish Ministry of Science, University of Aarhus and Silkeborg municipality, and involves 5 primary schools, 23 teachers and 233 pupils from 7th to 9 class. The project is positioned within the critical approach to school health education and health promotion, developed......Implementation of municipally health promoting projects' in primary schools: teachers perspective Research question This paper discusses the findings from a qualitative research, that aimed to investigate how teachers in primary schools implemented municipal health promoting projects focusing...... that there is a “gap” between policy and practice according to aim, content and methods, and that teachers practice can be explained as coping mechanism. The key findings include: • Teachers practice is closer to traditional health education than critical health education. • Teachers priorities the mandatory teaching...

  19. Solar chimney power generation project - The case for Botswana

    International Nuclear Information System (INIS)

    Ketlogetswe, Clever; Seabe, Omphemetse O.; Fiszdon, Jerzy K.

    2008-01-01

    Import of a huge proportion of electrical energy from the Southern African Power Pool, and the geographical location and population distribution of Botswana stimulated the need to consider renewable energy as an alternative to imported power. The paper describes a systematic experimental study on a mini-solar chimney system. Particular attention is given to measurements of air velocity, temperature and solar radiation. The results for the selected 5 and 6 clear days of October and November, respectively, are presented. These results enable the relationship between average insolation, temperature difference and velocity for selected clear days to be discussed. (author)

  20. Support services for new nuclear power plant projects

    International Nuclear Information System (INIS)

    Manrique, Alberto B.; Cazorla, Francisco

    2009-01-01

    TECNATOM is a spanish engineering company with more than 50 years of experience working for the nuclear industry all over the world. TECNATOM has worked in over 30 countries in activities related to the Operation and Maintenance of Nuclear Power Plants. It started to work in the design of new Nuclear Power Plants in the early 90s and since then has continued collaborating with different suppliers in the design and licensing of new reactors specially in the areas of plant systems design, Man-Machine Interface design, Main Control Room simulators building, training, qualification of equipment and PSI/ISI engineering services. (author)

  1. The environmental aspects of a tidal power project in the upper reaches of the Bay Fundy

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, D.C.; Longhurst, A.R.

    1979-02-01

    A recommendation for pre-investment design studies for a tidal power development in the Cumberland Basin region of the Bay of Fundy has been made by the Bay of Fundy Tidal Power Review Board and is backed by Canadian provincial and federal governments. A brief history of regional tidal power proposals is presented, and procedures for determining the environmental impacts of the project are outlined. Possible environmental consequences of tidal power development can be hypothesized, but the existing environmental data base is sparse. Investigations are presently being expanded by university and governmental scientists, and specific impact assessment studies will be commissioned if the project is authorized to proceed. (1 map, 11 references)

  2. 2015 Plan. Project 4: electric power supply, hydro electrical potential

    International Nuclear Information System (INIS)

    1992-12-01

    This project describes the Brazilian hydroelectric park citing the historical aspects, methodology of potential evaluation, forecasts of costs for hydroelectric use and the utilization of hydroelectric potential in small and reversible hydroelectric plants situated in all Brazilian regions. The utilization of hydroelectric potential in Amazon region is put in relief. 8 figs, 17 tabs

  3. Power project finance outside the U.S.: S and P's rating perspective

    International Nuclear Information System (INIS)

    Chew, William

    1994-01-01

    The growing prevalence of capital market debt financing for power projects outside the U.S. highlights the importance of understanding the risks this type of project poses, both for sponsors and potential investors. Based on its initial review of non-U.S. projects, S and P believes the stronger among them clearly have the potential to achieve ratings equal to or higher than those of U.S. projects. Nevertheless, sponsors still will need to address some of the risks such projects entail. S and P has established criteria that apply to power projects in all markets; however, it also has identified additional risks for projects outside the U.S. that should be addressed. (author)

  4. General consideration of domestic participation in nuclear power projects

    International Nuclear Information System (INIS)

    Csik, B.J.

    1975-01-01

    No nuclear power plant can be supplied entirely by outside sources. Some degree of domestic participation is always required and this can be increased if desired. There is no general rule as to what can and should be supplied locally; different countries have different characteristics, conditions and possibilities, and these define the scope of what is to be done. (orig./FW) [de

  5. Project Leninism -- The Powerful Weapon Against Modern Revisionism - Communist China

    National Research Council Canada - National Science Library

    1960-01-01

    ...) and the editorial department of the Jen-min Jih-pao. Being important documents on Marxism-Leninism, these three articles represent a powerful weapon for protecting Marxism-Leninism against modern revisionism. Based on Marxist-Leninist viewpoints and the theory of Mao Tse-tung, these articles give a penetrating analysis of some important problems in the present international communist movement.

  6. Linking school effectiveness and school improvement : The background and outline of the project

    NARCIS (Netherlands)

    Creemers, B.P.M.; Reezigt, G.J.

    2005-01-01

    School effectiveness and school improvement have different origins: School effectiveness is more directed to finding out "what works" in education and "why"; school improvement is practice and policy oriented and intended to change education in the desired direction. However, in their orientation to

  7. The School Children Mental Health in Europe (SCMHE) Project: Design and First Results

    OpenAIRE

    Kovess, Viviane; Carta, Mauro Giovanni; Pez, Ondine; Bitfoi, Adina; Ko?, Ceren; Goelitz, Dietmar; Kuijpers, Rowella; Lesinskiene, Sigita; Mihova, Zlatka; Otten, Roy

    2015-01-01

    Background : The School Children Mental Health in Europe (SCMHE) project aims to build up a set of indicators to collect and monitor children's mental health in an efficient and comparable methodology across the EU countries. It concerns primary schools children aged 6 to 11 years a range where few data are available whereas school interventions are promising. Methods : Three informants were used: parents, teachers and children. In selecting instruments language, instruments were selected acc...

  8. Teaching Basic Programming Concepts to Young Primary School Students Using Tablets: Results of a Pilot Project

    Science.gov (United States)

    Fokides, Emmanuel

    2018-01-01

    The study presents the results of a project in which tablets and a ready-made application were used for teaching basic programming concepts to young primary school students (ages 7-9). A total of 135 students participated in the study, attending primary schools in Athens, Greece, divided into three groups. The first was taught conventionally. The…

  9. Readings in Wildlife and Fish Conservation, High School Conservation Curriculum Project.

    Science.gov (United States)

    Ensminger, Jack

    This publication is a tentative edition of readings on Wildlife and Fish Conservation in Louisiana, and as such it forms part of one of the four units of study designed for an experimental high school course, the "High School Conservation Curriculum Project." The other three units are concerned with Forest Conervation, Soil and Water…

  10. Project-Based Learning versus Textbook/Lecture Learning in Middle School Science

    Science.gov (United States)

    Main, Sindy

    2015-01-01

    As schools continue to become more diverse, it is important to look at science teaching methods that will meet the needs of all students. In this study, 172 students in a middle school in Northwestern Illinois were taught using two methods of teaching science. Half of the students were taught using project-based science (PBS) and the other half of…

  11. Inclusive design in the implementation of projects for schools modernization in Portugal - case studies.

    Science.gov (United States)

    Lopes, Lígia; Aguiar, Carlos; da Silva, Fernando Moreira

    2012-01-01

    The Project for Schools Modernization taking place in Portugal, with an estimated total investment of 2450 million for the intervention in the first 205 schools, provide the reclassification of 332 secondary schools by 2015. One of the questions we can pose is if the authorities and the teams of architects selected to design these schools considered fundamental for the correctness of architectural barriers within the school and its accessibility the implementation of standards and principles of inclusion of children/teenagers with special needs within their school environment. As most of the projects are already being implemented, the main aim of this paper is to present the outcomes of a comparative analysis and synthesis of six schools located in the northern part of the country. This analysis occurs from the of Participatory Design perspective which appeals to the experience of the disable children to look (or evaluate) the negative and positive factors in terms of physical space, interpreted by inclusive design rules and orientations. Therefore, the evaluation of schools modernization project, and its discussion, is central for the understanding how these children are addressed in projects which are directed at them.

  12. Lessons from two Dutch projects for the introduction of computers in schools

    NARCIS (Netherlands)

    ten Brummelhuis, A.C.A.; Plomp, T.

    1993-01-01

    The systematic introduction of computers in schools for general secondary education in The Netherlands started in the early 1980s. Initially, the Dutch government experimented in 1983 with a project in 100 lower general secondary schools limited in scope to gain experience with educational computer

  13. Looking at Life. Study Guide. Unit A2. ZIM-SCI, Zimbabwe Secondary School Science Project.

    Science.gov (United States)

    Hosking, Bunty

    The Zimbabwe Secondary School Science Project (ZIM-SCI) developed student study guides, corresponding teaching guides, and science kits for a low-cost science course which could be taught during the first 2 years of secondary school without the aid of qualified teachers and conventional laboratories. This ZIM-SCI study guide presents activities…

  14. Looking at Life. Teacher's Guide. Unit A2. ZIM-SCI, Zimbabwe Secondary School Science Project.

    Science.gov (United States)

    Hosking, Bunty

    The Zimbabwe Secondary School Science Project (ZIM-SCI) developed student study guides, corresponding teaching guides, and science kits for a low-cost science course which could be taught during the first 2 years of secondary school without the aid of qualified teachers and conventional laboratories. This teaching guide, designed to be read in…

  15. Which Type of Inquiry Project Do High School Biology Students Prefer: Open or Guided?

    Science.gov (United States)

    Sadeh, Irit; Zion, Michal

    2012-01-01

    In teaching inquiry to high school students, educators differ on which method of teaching inquiry is more effective: Guided or open inquiry? This paper examines the influence of these two different inquiry learning approaches on the attitudes of Israeli high school biology students toward their inquiry project. The results showed significant…

  16. Effects of Implementing STEM-I Project-Based Learning Activities for Female High School Students

    Science.gov (United States)

    Lou, Shi-Jer; Tsai, Huei-Yin; Tseng, Kuo-Hung; Shih, Ru-Chu

    2014-01-01

    This study aims to explore the application of STEM-I (STEM-Imagination) project-based learning activities and its effects on the effectiveness, processes, and characteristics of STEM integrative knowledge learning and imagination development for female high school students. A total of 72 female high school students were divided into 18 teams.…

  17. Determining Teachers' Educational Needs Regarding School Education Projects within the Scope of Erasmus+ Programme

    Science.gov (United States)

    Karakus, Fatma; Uyar, Melis Yesilpinar; Balbag, Nur Leman

    2017-01-01

    The purpose of this study was to determine teachers' educational needs regarding school education projects within the scope of Erasmus+ programme. In the study, the case study method, one of qualitative research designs, was used. The participants were determined using the snowball sampling method, and eight secondary school teachers took part in…

  18. Solid-State Thermionic Nuclear Power for Megawatt Propulsion, Planetary Surface and Commercial Power Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Thermionic (TI) power conversion is a promising technology first investigated for power conversion in the 1960’s, and of renewed interest due to modern...

  19. THE PROJECT-BASED CURRICULUM AND COMPLEXITY IN SCHOOL: POSSIBILITIES FOR AN EDUCATION ON VALUES

    Directory of Open Access Journals (Sweden)

    Ricardo Fernandes Pátaro

    2013-07-01

    Full Text Available This paper is derived from a dissertation and the main goal is to argue how the project-based curriculum, in a perspective of complexity, can offers some possibilities for an education on values introducing studies of nowadays social problems into the school. To achieve the objectives was considered a project developed with a ten years old students. The investigation was based on project activities and daily field. As a result we have demonstrated the project-based curriculum – using the complexity, interdisciplinary and transversality as references – can help school to combine the disciplinary knowledge to the ethical formation. The investigation has show that the project-based curriculum may lead schools to succeed in implementing an education in values, pointing out some directions to develop citizens who can deal with diversity and conflicts as well as capable of get indignant with the injustices and have disposal to individual and collective welfare.

  20. School Belonging in Different Cultures: The Effects of Individualism and Power Distance

    Directory of Open Access Journals (Sweden)

    Kai S. Cortina

    2017-11-01

    Full Text Available Limited evidence exists on how the larger cultural framework affects psychological processes related to schooling. We investigated how the cultural dimensions of individualism/collectivism and power distance influence the sense of school belongingness using 2003 Programme for International Student Assessment survey data on 15-year-old students from 31 countries. Hierarchical linear modeling analysis indicated that power distance (i.e., hierarchical nature of social relationships is a better predictor of school belongingness on the cultural level than individualism/collectivism. Accordingly, students living in cultures with high degree of power distance (particularly East Asian countries in these data sets report lower school belongingness than students living in cultures with more lateral power relationships (Western countries. Positive teacher student relations and preference for cooperative learning environment predict higher school belongingness across cultures.

  1. Prioritizing the countries for BOT nuclear power project using Analytic Hierarchy Process

    International Nuclear Information System (INIS)

    Choi, Sun Woo; Roh, Myung Sub

    2013-01-01

    This paper proposes factors influencing the success of BOT nuclear power projects and their weighting method using Analytic Hierarchy Process (AHP) to find the optimal country which developer intends to develop. To summarize, this analytic method enable the developer to select and focus on the country which has preferable circumstance so that it enhances the efficiency of the project promotion by minimizing the opportunity cost. Also, it enables the developer to quantify the qualitative factors so that it diversifies the project success strategy and policy for the targeted country. Although the performance of this study is insufficient due to the limitation of time, small sampling and security of materials, it still has the possibility to improve the analytic model more systematically through further study with more data. Developing Build-Own(or Operate)-Transfer (BOT) nuclear power project carrying large capital in the long term requires initially well-made multi-decision which it prevents sorts of risks from unexpected situation of targeted countries. Moreover, the nuclear power project in most case is practically implemented by Government to Government cooperation, so the key concern for such nuclear power project would be naturally focused on the country situation rather than project viability at planning stage. In this regard, it requires the evaluation of targeted countries before involving the project, comprehensive and proper decision making for complex judgment factors, and efficient integration of expert's opinions, etc. Therefore, prioritizing and evaluating the feasibility of country for identification of optimal project region is very meaningful study

  2. 2015 Plan. Project 2: the electric power sector and the Brazilian economy: insertion and forecasts

    International Nuclear Information System (INIS)

    1993-05-01

    This project shows the economic and the energetic view of the Brazilian electric power sector, mentioning the actual conjuncture; the economy evolution; some sector forecasts; demographical aspects; international price of petroleum and National Energetic Matrix. (C.G.C.)

  3. National project : advanced robot for nuclear power plant

    International Nuclear Information System (INIS)

    Tsunemi, T.; Takehara, K.; Hayashi, T.; Okano, H.; Sugiyama, S.

    1993-01-01

    The national project 'Advanced Robot' has been promoted by the Agency of Industrial science and Technology, MITI for eight years since 1983. The robot for a nuclear plant is one of the projects, and is a prototype intelligent one that also has a three dimensional vision system to generate an environmental model, a quadrupedal walking mechanism to work on stairs and four fingered manipulators to disassemble a valve with a hand tool. Many basic technologies such as an actuator, a tactile sensor, autonomous control and so on progress to high level. The prototype robot succeeded functionally in official demonstration in 1990. More refining such as downsizing and higher intelligence is necessary to realize a commercial robot, while basic technologies are useful to improve conventional robots and systems. This paper presents application studies on the advanced robot technologies. (author)

  4. Geopolitical model of investment power station construction project implementation

    Science.gov (United States)

    Malafeyev, Oleg; Farvazov, Konstantin; Zenovich, Olga; Zaitseva, Irina; Kostyukov, Konstantin; Svechinskaya, Tatiana

    2018-04-01

    Two geopolitical actors implement a geopolitical project that involves transportaion and storage of some commodities. They interact with each other through a transport network. The network consists of several interconnected vertices. Some of the vetrices are trading hubs, storage spaces, production hubs and goods buyers. Actors wish to satify the demand of buyers and recieve the highest possible profit subject to compromise solution principle. A numerical example is given.

  5. Fermeuse wind power project Newfoundland : noise and visual analysis studies

    Energy Technology Data Exchange (ETDEWEB)

    Henn, P.; Turgeon, J.; Heraud, P.; Belanger, S.; Dakousian, S.; Lamontagne, C.; Soares, D. [Helimax Energy Inc., Montreal, PQ (Canada); Basil, C.; Boulianne, S.; Salacup, S.; Thompson, C. [Skypower, Toronto, ON (Canada)

    2008-03-15

    This paper discussed the noise and visual analyses used to assess the potential impacts of a wind energy project on the east coast of the Avalon Peninsula near St. John's, Newfoundland. The proposed farm will be located approximately 1 km away from the town of Fermeuse, and will have an installed capacity of 27 MW from 9 turbines. The paper provided details of the consultation process conducted to determine acceptable distance and site locations for the wind turbines from the community. Stakeholders were identified during meetings, events, and discussions with local authorities. Consultations were also held with government agencies and municipal councils. A baseline acoustic environment study was conducted, and details of anticipated environmental impacts during the project's construction, operation, and decommissioning phases were presented. The visual analysis study was divided into the following landscape units: town, shoreline, forest, open land and lacustrine landscapes. The effect of the turbines on the landscapes were assessed from different viewpoints using visual simulation programs. The study showed that the visual effects of the project are not considered as significant because of the low number of turbines. It was concluded that the effect of construction on ambient noise levels is of low concern as all permanent dwellings are located at least 1 km away from the turbines. 2 refs., 4 tabs., 4 figs.

  6. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  7. Wind power projects in the CDM: Methodologies and tools for baselines, carbon financing and substainability analysis

    DEFF Research Database (Denmark)

    Ringius, L.; Grohnheit, Poul Erik; Nielsen, Lars Henrik

    2002-01-01

    and implications of the various methodologies and approaches in a concrete context, Africa's largest wind farm-namely the 60 MW wind farm located in Zafarana,Egypt is examined as a hypothetical CDM wind power project The report shows that for the present case example there is a difference of about 25% between......The report is intended to be a guidance document for project developers, investors, lenders, and CDM host countries involved in wind power projects in the CDM. The report explores in particular those issues that are important in CDM project assessment anddevelopment - that is, baseline development......, carbon financing, and environmental sustainability. It does not deal in detail with those issues that are routinely covered in a standard wind power project assessment. The report tests, compares, andrecommends methodologies for and approaches to baseline development. To present the application...

  8. Culture Connection Project: promoting multiculturalism in elementary schools.

    Science.gov (United States)

    Matuk, Lucia Yiu; Ruggirello, Tina

    2007-01-01

    To promote multiculturalism among grade school students through drama education. Grade 3-6 students (N = 665) from 6 targeted schools including lead-class students (n = 158) representing each school. Elementary schools in Windsor-Essex County, Ontario, Canada. In this non-experimental design study, group discussions conducted with each lead class to explore students' understanding of multiculturalism were developed into an interactive drama performance and performed for all grades 3-6 students in their respective schools. A follow-up drama workshop was offered to each lead class one week after the drama performance. All students completed a 7-item questionnaire before and after the drama performance and after the drama workshop. Pre-test and post-test data collected were analyzed using T-test and ANOVA to determine the effects of drama education on students' attitudes toward multiculturalism. Statistical analysis at 0.05 significance level revealed that both the performance and the drama workshop heightened students' awareness of racism, and instilled cultural respect through "talking with others", "accepting others", and "believing that they can make a difference" in multiculturalism promotion. Drama education was an effective experiential tool for promoting multiculturalism in a school setting. The key to promoting inter-racial harmony is to respect and accept individual differences and to broaden the social determinants of health by providing culture safety care.

  9. Joint Arab project for building of nuclear power plants

    International Nuclear Information System (INIS)

    Mosbah, D.S.

    2010-01-01

    Recently many Arab countries have expressed their interest in adopting nuclear power for electricity generation and seawater desalination in their energy strategies and hence sought assistance from IAEA and Arab Atomic Energy Agency. The Council of the League of Arab States at the summit level encouraged member states to develop peaceful use of atomic energy in different aspects of development, especially in energy generation and to establish a cooperative Arab program in this field. The burden of infrastructure can be reduced significantly if an Arab country forms a sharing partnership with other Arab countries. The sharing can be between two or more Arab states. It can include physical facilities, common programmes and knowledge, which will reflect in economic benefits. The sharing can also contribute in a significant manner to harmonization of codes and standards in general and regulatory framework in particular. This article outlines the major direct benefits of joint nuclear Arab programme to build a Nuclear Power Plants. (author)

  10. Power plant project success through total productive generation

    Energy Technology Data Exchange (ETDEWEB)

    Kaivola, R.; Tamminen, L.

    1996-11-01

    The Total Productive Generation concept (TPG) defines the lines of action adopted by IVO Generation Services Ltd (IGS) for the operation and maintenance of power plants. The TPG concept is based on procedures tested in practice. The main idea of TPG is continuous development of quality, which is a joint effort of the entire staff. Its objective is to benefit IGS`s own staff and, in particular, the company`s customers. (orig.)

  11. Port Menier thermal power plant: Pre-project report

    International Nuclear Information System (INIS)

    1992-02-01

    Port Menier, the town on Anticosti Island in the St Lawrence River estuary, is supplied with electricity from a diesel power plant having a firm capacity of 1,080 kW. Since 1987, power demand has increased at an average annual rate of 5.7%, raising the winter peak demand from 670 kW to 987 kW. The power plant is located in the center of town and is obsolete, presenting a number of architectural, environmental, and operational deficiencies. It is proposed to construct a new power plant having an initial firm capacity of 1,490 kW and storage capacity for 75,000 liters of fuel. The plant site will have an area of ca 6,265 m 2 to allow for an eventual expansion to over 3,000 kW capacity, sufficient for satisfying forecast demand over the next 20 years. Estimated cost of the new plant is ca $9.5 million. The old plant will be decommissioned and the new plant will be built at a site outside of town. The natural and human environments characteristic of the Port Menier area are detailed and the two selected sites for the new plant are described and compared. A site in the industrial zone of Port-Menier is favored. The environmental impacts of the new plant are analyzed and mitigation measures during the preconstruction, construction, and operational phases are proposed. Local economic impacts are estimated at around $990,000. 20 refs., 12 figs., 12 tabs

  12. Singularities of projection of an active power in frequency converter

    Directory of Open Access Journals (Sweden)

    Є.К. Батуревич

    2005-03-01

    Full Text Available  The level of security of static single-phase watt-hour meters of an electric energy concerning a possibility of unauthorized takeoff of an electric energy by electric methods is analyses. The shortages of an active power in a pulse frequency converter are marked which are used in such watt-hour meters. The solutions on their refinement are offered.

  13. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  14. The United States National Library Power School Program: Research Evaluation and Implications for Professional Development and Library Education.

    Science.gov (United States)

    Hopkins, Dianne McAfee; Zweizig, Douglas L.

    The Library Power program is a school improvement initiative of the DeWitt-Wallace Reader's Digest Fund that began in 1988, designed to promote the full integration of the school library media program into the school curriculum in public elementary and junior high/middle schools. With a total investment exceeding $45 million, Library Power is the…

  15. 2017 NMC Technology Outlook for Nordic Schools A Horizon Project Regional Report

    DEFF Research Database (Denmark)

    2017-01-01

    research effort between the New Media Consortium (NMC) and the Norwegian Centre for ICT in Education to inform Nordic school leaders and decision-makers about significant developments in technologies supporting teaching, learning, and creative inquiry in primary and secondary education across Denmark......Adams Becker, S., Cummins, M., Freeman, A., and Rose, K. (2017). 2017 NMC Technology Outlook for Nordic Schools: A Horizon Project Regional Report. Austin, Texas: The New Media Consortium. The 2017 NMC Technology Outlook for Nordic Schools: A Horizon Project Regional Report reflects a collaborative...

  16. School, multiliteracies and tecnologies in the portuguese language class: reflections from a project on youtubers

    Directory of Open Access Journals (Sweden)

    Gabriela da Silva Bulla

    2017-12-01

    Full Text Available This paper aims at reflecting on school, multiliteracies and technologies in contemporary society. To this end, we describe and analyze a learning project carried out with a ninth grade class in Portuguese Language classes at a public school in Porto Alegre, Brazil. The project focused on multimodal discourse genres such as Youtuber video and written dissertation. We highlight the importance of working with the promotion of multiliteracies in the school that is committed to the formation of citizens that are able to circulate critically through the cybercultural and mediatic spheres inherent in the network society.

  17. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  18. Study and Proposal of the Nuclear Power Plant Technology for the Ninh Thuan 2 Project

    International Nuclear Information System (INIS)

    Tran Chi Thanh; Le Van Hong; Hoang Sy Than; Nguyen Van De; Mai Dinh Trung; Nguyen Nhi Dien; Nguyen Minh Tuan; Pham Van Lam; Phan Ngoc Tuyen; Do Chi Dung; Hoang Minh Giang; Le Dai Dien

    2015-01-01

    The Ninh Thuan 1&2 Nuclear Power Plant Projects were approved on November 25th, 2009. At present, the task of NPP technology selection of these projects is an important and complex task. This report will show the acceptable method to create a set of criterion for selecting technology for Ninh Thuan 2 NPP project. The result of evaluation of three NPP technologies, such as ATMEA1, AP1000 and MPWR+ introduced in the Feasibility Study Reports of this project, will be discussed. In conclusion, the AP1000 technology is the first candidate for the Ninh Thuan 2 NPP Project. (author)

  19. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  20. Low Friction Cryostat for HTS Power Cable of Dutch Project

    DEFF Research Database (Denmark)

    Chevtchenko, Oleg; Zuijderduin, Roy; Smit, Johan

    2012-01-01

    affecting public acceptance of the project. In order to solve this problem, a model cryostat was developed consisting of alternating rigid and flexible sections and hydraulic tests were conducted using sub-cooled liquid nitrogen. In the 47 m-long cryostat, containing a full-size HTS cable model, measured....... A flexible dummy HTS cable was inserted into this cryostat and sub-cooled liquid nitrogen was circulated in the annulus between the dummy cable surface and the inner cryostat surface. In the paper details are presented of the cryostat, of the measurement setup, of the experiment and of the results....

  1. Modern Distance Education Project for the Rural Schools of China: Recent Development and Problems

    Science.gov (United States)

    Yu, S. Q.; Wang, Minjuan J.

    2006-01-01

    The Modern Distance Education Project for the Rural Schools (MDEPRS) of China has a wider scope and serves a larger population than any other informational project in the world. It likely will result in a far-reaching informational revolution for basic education in China. Here, we introduce three main innovative models of material delivery, the…

  2. William H. Taft High School Project HOLA 1983-1984. O.E.A. Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.

    This report evaluates Project HOLA, in its first year of funding, which provides instruction in English as a second language, Spanish language skills, and bilingual instruction in mathematics, science, and social studies to approximately 230 students in a high school in Bronx, New York. The report examines the project's long- and short-range…

  3. William H. Taft High School Project HOLA 1984-1985. O.E.A. Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    In 1984-85, Project HOLA was in its second year of funding at William H. Taft High School in the Bronx, New York. HOLA serves Spanish-speaking students of limited English proficiency (LEP). Project goals include speedy acquisition of English skills, orientation to life in America, maintenance and improvement of Spanish skills and cultural…

  4. "Saturday Night Live" Goes to High School: Conducting and Advising a Political Science Fair Project

    Science.gov (United States)

    Allen, Meg; Brewer, Paul R.

    2010-01-01

    This article uses a case study to illustrate how science fair projects--which traditionally focus on "hard science" topics--can contribute to political science education. One of the authors, a high school student, conducted an experimental study of politics for her science fair project. The other author, a faculty member, was asked to advise the…

  5. The Effect of Soil Education Project on Pre-School Children

    Science.gov (United States)

    Gulay, Hulya; Yilmaz, Sevket; Gullac, Esin Turan; Onder, Alev

    2010-01-01

    The objective of this study is to evaluate the efficiency of the first two group applications of the project named "We are Learning about the Soil with Tipitop and His Friends" within the scope of the project group activities of The Scientific and Technological Research Council of Turkey (TUBITAK) "Schools of Nature and…

  6. Innovative use of ICT in schools based on the findings in ELFE project

    NARCIS (Netherlands)

    Frederiksson, Ulf; Jedeskog, Gunilla; Plomp, T.

    2008-01-01

    The European e-Learning Forum for Education (ELFE) is a project initiated by the ETUCE (European Trade Union Committee on Education). An important objective of the project has been to study good experiences with implementing the use of ICT in schools. This objective has been broken down in seven

  7. Experience in Use of Project Method during Technology Lessons in Secondary Schools of the USA

    Science.gov (United States)

    Sheludko, Inna

    2015-01-01

    The article examines the opportunities and prospects for the use of experience of project method during "technology lessons" in US secondary schools, since the value of project technology implementation experience into the educational process in the USA for ensuring holistic development of children, preparing them for adult life, in…

  8. Seward Park High School Project CABES 1984-1985. OEA Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    Career Advancement through Bilingual Educational Skills (Project CABES) completed the second year of a 3-year funding cycle at Seward Park High School on Manhattan's Lower East Side. Project CABES serves 233 recently immigrated, predominantly low-income, ninth through twelfth grade, Hispanic students of limited English proficiency (LEP). Included…

  9. Seward Park High School Project CABES, 1985-1986. OEA Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    In 1985-86, the Career Advancement through Bilingual Education Skills (CABES) project was in the final year of a three-year funding cycle at Seward Park High School in Manhattan, New York. The project's major goal was to provide career advancement skills to a population group of 279 students of limited English proficiency (LEP). Included in the…

  10. A Discussion Project on High School Adolescents' Perceptions of the Relationship between Students and Teachers

    Science.gov (United States)

    Fisher, Ronald J.

    1976-01-01

    Describes a small group discussion project involving students and teachers in two large white suburban high schools. The project's intention was to focus discussion on the social quality of the relationship between students and teachers, and to assess the impact of the discussions on student perceptions. (Author/RK)

  11. Buddy-Tutor Project. Hilo Intermediate School. Final Report, March-July, 1974.

    Science.gov (United States)

    Hawaii Univ., Honolulu. Social Welfare Development and Research Center.

    An operational description of the 1973-74 Buddy-Tutor Project at Hilo Intermediate School in Hilo, Hawaii and an evaluative assessment of its outcome with statistical treatment of the data is provided in this report. This project is an exploratory behavioral intervention program for educationally deprived students and focuses its efforts on the…

  12. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  13. Strategically oriented project management of the decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Kemmeter, Sascha; Woempener, Andreas

    2013-01-01

    Due to the politically induced change of the energy sector in Germany, the operators of nuclear power plants had to react and to deal with completely new conditions concerning the decommissioning of their plants on short notice. Therefore the operators have to devise new strategies for controlling their decommissioning and dismantling projects in a short amount of time and most often similarly for several plants. Two fundamental procedures are possible for the successful controlling of these dismantling projects: a centralized or a decentralized management organization. How these project control processes can be realized in an optimal way, is, next to other economic specifications of the dismantling of nuclear power plants, the topic of a new research project of the Chair of Management Accounting at the University Duisburg-Essen. In that process, results and experiences from other research and practical projects concerning general large-scale projects are being used. Selected findings have been compiled and are being discussed in this paper. (orig.)

  14. Ownership options, financing structures, and regulatory considerations affecting independent power production projects

    International Nuclear Information System (INIS)

    Knapp, G.M.

    1990-01-01

    In this paper is a framework for analysis of the legal, financing, and policy differences between independent power production projects (IPPs) and projects with qualifying facility status (QFs) under the Public Utility Regulatory Policies Act (PURPA). At a basic level, there is no fundamental difference in types of ownership and financing structures available to IPPs and QFS. The key consideration, though, is the regulatory and legal implications to project participants. Significant issues arise for equity participants, lenders, developers, and project operators that are considering IPP projects. Of course, many of these same issues apply to certain types of QF projects that are not fully exempt from the Public Utility Holding Company Act (PUHCA) and the Federal Power Act (FPA)

  15. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested parties to attend a teleconference from...

  16. Sustainable model for financial viability of decentralized biomass gasifier based power projects

    NARCIS (Netherlands)

    Palit, D.; Malhotra, R.; Kumar, Atul

    2011-01-01

    This paper made a modest attempt for designing a sustainable model for financial viability of biomass gasifier power projects for enhancing electricity access in India and other developing countries. For long term sustainability of distributed generation projects in remote rural areas, viability

  17. Aerosol particles generated by diesel-powered school buses at urban schools as a source of children’s exposure

    Science.gov (United States)

    Hochstetler, Heather A.; Yermakov, Mikhail; Reponen, Tiina; Ryan, Patrick H.; Grinshpun, Sergey A.

    2015-01-01

    Various heath effects in children have been associated with exposure to traffic-related particulate matter (PM), including emissions from school buses. In this study, the indoor and outdoor aerosol at four urban elementary schools serviced by diesel-powered school buses was characterized with respect to the particle number concentrations and size distributions as well as the PM2.5 mass concentrations and elemental compositions. It was determined that the presence of school buses significantly affected the outdoor particle size distribution, specifically in the ultrafine fraction. The time-weighted average of the total number concentration measured outside the schools was significantly associated with the bus and the car counts. The concentration increase was consistently observed during the morning drop-off hours and in most of the days during the afternoon pick-up period (although at a lower degree). Outdoor PM2.5 mass concentrations measured at schools ranged from 3.8 to 27.6 µg m−3. The school with the highest number of operating buses exhibited the highest average PM2.5 mass concentration. The outdoor mass concentrations of elemental carbon (EC) and organic carbon (OC) were also highest at the school with the greatest number of buses. Most (47/55) correlations between traffic-related elements identified in the outdoor PM2.5 were significant with elements identified in the indoor PM2.5. Significant associations were observed between indoor and outdoor aerosols for EC, EC/OC, and the total particle number concentration. Day-to-day and school-to-school variations in Indoor/Outdoor (I/O) ratios were related to the observed differences in opening windows and doors, which enhanced the particle penetration, as well as indoor activities at schools. Overall, the results on I/O ratio obtained in this study reflect the sizes of particles emitted by diesel-powered school bus engines (primarily, an ultrafine fraction capable of penetrating indoors). PMID:25904818

  18. Aerosol particles generated by diesel-powered school buses at urban schools as a source of children's exposure.

    Science.gov (United States)

    Hochstetler, Heather A; Yermakov, Mikhail; Reponen, Tiina; Ryan, Patrick H; Grinshpun, Sergey A

    2011-03-01

    Various heath effects in children have been associated with exposure to traffic-related particulate matter (PM), including emissions from school buses. In this study, the indoor and outdoor aerosol at four urban elementary schools serviced by diesel-powered school buses was characterized with respect to the particle number concentrations and size distributions as well as the PM2.5 mass concentrations and elemental compositions. It was determined that the presence of school buses significantly affected the outdoor particle size distribution, specifically in the ultrafine fraction. The time-weighted average of the total number concentration measured outside the schools was significantly associated with the bus and the car counts. The concentration increase was consistently observed during the morning drop-off hours and in most of the days during the afternoon pick-up period (although at a lower degree). Outdoor PM2.5 mass concentrations measured at schools ranged from 3.8 to 27.6 µg m -3 . The school with the highest number of operating buses exhibited the highest average PM2.5 mass concentration. The outdoor mass concentrations of elemental carbon (EC) and organic carbon (OC) were also highest at the school with the greatest number of buses. Most (47/55) correlations between traffic-related elements identified in the outdoor PM2.5 were significant with elements identified in the indoor PM2.5. Significant associations were observed between indoor and outdoor aerosols for EC, EC/OC, and the total particle number concentration. Day-to-day and school-to-school variations in Indoor/Outdoor (I/O) ratios were related to the observed differences in opening windows and doors, which enhanced the particle penetration, as well as indoor activities at schools. Overall, the results on I/O ratio obtained in this study reflect the sizes of particles emitted by diesel-powered school bus engines (primarily, an ultrafine fraction capable of penetrating indoors).

  19. Methodology for projecting the limits of nuclear power growth

    International Nuclear Information System (INIS)

    Francis, J.M.; Omberg, R.P.

    1981-06-01

    A scenario using only the most conservative, and yet reasonable, assumptions on GNP growth is constructed, and from this, electrical growth is inferred. Implicit in this technique is the assumption that most new energy demand will arise from the industrial sector. Thus, in the commercial and residential sectors, increasing demand by consumers is offset by new conservation techniques for little net change in energy demand. Consequently, this approach emphasizes the need for conservation as well as the need for new generating capability. The emphasis on coal and nuclear power is described

  20. Project of mechanical components for nuclear power plants

    International Nuclear Information System (INIS)

    Amaral, J.A.R. do; Farias Brito David, D. de

    1984-01-01

    The equipment foreseen to be part of a nuclear power plant must show high quality and safety due to the presence of radioactivity. Besides the perfect functioning during the rigid operating conditions, some postulated loadings are foreseen, like earthquake and loss of coolant accidents, which must be also considered in the design of the components. The design and calculation's concept and development, the interactions with the piping and civil designs, as well as their influences in the licensing process with the authorities are described. (Author) [pt

  1. Nuclear Power Plant project site selection geotechnical considerations

    International Nuclear Information System (INIS)

    Katti, V.J.; Banerjee, D.C.

    1997-01-01

    During the selection of a site for Nuclear Power Plant (NPP) and Radioactive Waste Plant (RWP), geotechnical investigations play a significant role in deciding merits and demerits of the sites. Any accidents in these units can play havoc on mankind and may leave bitter imprints on generations to come. Hence proper care has to be taken at the early stage for selecting the sites. Site selection procedure is a complicated one, because it involves experts from various disciplines like geology, geophysics, civil, mechanical electrical engineering, health-physics and other fields

  2. The Heysham 2 and Torness nuclear power station projects

    International Nuclear Information System (INIS)

    Cameron, P.J.

    1989-01-01

    At the beginning of the design of the Heysham 2 and Torness Nuclear Power Stations in the UK, it was agreed that the Hinkley Point B/Hunterston B Advanced Gas Cooled reactor design would be repeated. However, the Hinkley Point B/Hunterston B designs dated from 1964, and inevitably safety requirements had escalated in the intervening years. Furthermore, operating experience gained from Hinkley Point B/Hunterston B showed that it was desirable to make changes to particular features. Design changes were therefore included where it was considered essential to improve performance, to improve safety and to improve engineering. The resulting station designs are described. (author)

  3. Undergraduate degree projects in the Swedish dental schools: a documentary analysis.

    Science.gov (United States)

    Franzén, C; Brown, G

    2013-05-01

    Undergraduate degree projects have currently been introduced into courses in the four Swedish dental schools. The rationale for research projects is that they enable students to develop research expertise skills and to show their ability to apply and develop knowledge relevant to professional practice. This paper reports a qualitative analysis of the curriculum documents and handbooks including the criteria used to assess the students' research reports. The aim was to investigate commonalities and differences in the design of degree projects between the four Swedish dental schools and to explore any inconsistencies within the documents. The documentary analysis was based on the constant comparison method. Four overarching themes emerged from the analysis: (i) developing scientific expertise, (ii) developing professional expertise, (iii) following rules and (iv) fostering creativity. The documents from the four dental schools revealed similar views on the purposes of the projects and provided similar assessment criteria. The students were requested to formulate an odontological problem, apply a relevant scientific method, analyse texts and empirical data, express critical reflections and write a short thesis. The students were free to choose topics. There were differences between the dental schools on the emphasis placed on practical uses of the projects and theoretical background of the projects. Two of the schools insisted on rigid rules of completing and writing the project yet paradoxically emphasised creativity. There were wide variations in the required length of the project report. The report may prove useful to dental schools in other countries who are about to design undergraduate research projects. © 2013 John Wiley & Sons A/S. Published by Blackwell Publishing Ltd.

  4. The market for, and economics of, cogeneration and independent power projects in a competitive environment

    International Nuclear Information System (INIS)

    McLeese, R.

    1999-01-01

    A corporate review of Access Capital Corporation was presented. The company is a financial advisor for the development and ownership of electric power projects. The company has expertise in various technologies including gas-fired cogeneration, hydro energy, biomass, renewables and district heating. This presentation included a series of overhead viewgraphs which focused on: (1) the restructuring of Ontario's electricity market, (2) future private power requirements, (3) economics of IPP technologies, (4) pros and cons of on-site power generation, (5) rates paid for private power supply, and (6) financial restructuring of current NUG power purchase contracts. 2 tabs., 6 figs

  5. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  6. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Science.gov (United States)

    2010-06-02

    ... associated with the Dallas Creek Project; and the anticipated return on investment. If there are additional... entity to develop hydroelectric power at Ridgway Dam, and power purchasing and/or marketing... and interested entities to discuss Western's potential marketing of hydropower. FOR FURTHER...

  7. Study on optimized decision-making model of offshore wind power projects investment

    Science.gov (United States)

    Zhao, Tian; Yang, Shangdong; Gao, Guowei; Ma, Li

    2018-02-01

    China’s offshore wind energy is of great potential and plays an important role in promoting China’s energy structure adjustment. However, the current development of offshore wind power in China is inadequate, and is much less developed than that of onshore wind power. On the basis of considering all kinds of risks faced by offshore wind power development, an optimized model of offshore wind power investment decision is established in this paper by proposing the risk-benefit assessment method. To prove the practicability of this method in improving the selection of wind power projects, python programming is used to simulate the investment analysis of a large number of projects. Therefore, the paper is dedicated to provide decision-making support for the sound development of offshore wind power industry.

  8. REALIZATION OF INVESTMENT PROJECTS IN POWER GENERATION SECTOR AND DETERMINATION OF CAPITAL INVESTMENT SOURCES

    Directory of Open Access Journals (Sweden)

    V. N. Nagornov

    2008-01-01

    Full Text Available The paper contains information on the basic directions of an investment activity in the power generation sector of the Republic of Belarus and importance of the realization of planned actions at the present moment. The main sources for financing modernization of basic production funds of the Belarusian power generation system have been analyzed in the paper. The paper describes general problems and difficulties that the power industry is facing while realizing investment projects. The most important problem is a formation of sources for complete project financing due to sharp price rise for imported power resources. The paper considers various approaches to provision of the required sources for financing investment activity in the power sector. The paper shows the need for a tariff policy reform, which is to be aimed, first of all, at the reduction of the cross subsidizing in power tariffs.

  9. Power monitoring and control for large scale projects: SKA, a case study

    Science.gov (United States)

    Barbosa, Domingos; Barraca, João. Paulo; Maia, Dalmiro; Carvalho, Bruno; Vieira, Jorge; Swart, Paul; Le Roux, Gerhard; Natarajan, Swaminathan; van Ardenne, Arnold; Seca, Luis

    2016-07-01

    Large sensor-based science infrastructures for radio astronomy like the SKA will be among the most intensive datadriven projects in the world, facing very high demanding computation, storage, management, and above all power demands. The geographically wide distribution of the SKA and its associated processing requirements in the form of tailored High Performance Computing (HPC) facilities, require a Greener approach towards the Information and Communications Technologies (ICT) adopted for the data processing to enable operational compliance to potentially strict power budgets. Addressing the reduction of electricity costs, improve system power monitoring and the generation and management of electricity at system level is paramount to avoid future inefficiencies and higher costs and enable fulfillments of Key Science Cases. Here we outline major characteristics and innovation approaches to address power efficiency and long-term power sustainability for radio astronomy projects, focusing on Green ICT for science and Smart power monitoring and control.

  10. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...

  11. Rehabilitation and modernization project of units 1 and 2 of Laguna Verde Nuclear Power Plant. A strengthening project to 120%. (2nd phase)

    International Nuclear Information System (INIS)

    Liebana, B.; Merino, A.; Garcia, J. L.; Gomez, M.; Martinez, I.; Ruiz, L.

    2010-01-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This article presents the work of the second phase.

  12. Factors Causing Delay of Modification Projects at Koeberg Nuclear Power Station

    International Nuclear Information System (INIS)

    Ntoyanto, S.

    2017-01-01

    Modification project delays could lead to: disrupting the maintenance shutdown (outage) projects' schedule, affecting electricity capacity of the national grid., possible load-shedding restricting electricity supply to domestic, commercial, and industrial consumers; and detrimental consequences to the country's economic activities. To address proficiency of a project manager by improving: Understanding of the organizational processes, High-level technical knowledge of a nuclear power plant technology

  13. 18-months fuel cycle engineering and its project management of the Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Fu Xiangang; Jiao Ping; Liu Yong; Wu Zhiming

    2002-01-01

    The author introduces aspects related to the performing of 18-months fuel cycle engineering evaluation to the Daya Bay nuclear power plant, including the assessment on proposed technical solutions, appointment to the contractors, breaking down and implementation of project, experience on the project management and risk control, and etc. And it also briefs the prompting to the localization of the long fuel cycle engineering technology and AFA 3G fuel manufacturing and design technology via adequate technology transferring of this project

  14. [Subtainable health promotion via organisational development--a model project for teachers in professional training schools].

    Science.gov (United States)

    Schumacher, L; Nieskens, B; Bräuer, H; Sieland, B

    2005-02-01

    The goal of this project is the development, implementation and evaluation of a concept designed for sustainable health promotion among occupational and trade school teachers. We assume that for sustainable health promotion -- along with a behavioral prevention program -- a change is necessary in the structure, as well as, the working and communication processes within schools. The realization of early teacher participation and self regulated cooperative groups initiates comprehensive and goal-oriented developmental processes in the project schools. The organizational development process was accomplished in the following way: At the beginning we conducted a diagnosis of school-specific and individual health risks and the resources available to the project schools. The results were reported for both the individual and for the teacher group. This was intended to clarify the potential for improvement and, thus, strengthen the teachers' motivation toward processes of change. Following the diagnosis, the teachers chose areas of stress-related strain and then worked in groups to develop and implement behaviour and working condition-oriented intervention strategies for health promotion. The diagnosis results confirm the necessity of school-specific health promotion: the schools demonstrate very different demand and resource profiles. Furthermore, is has become evident that the central success factor for health promotion in schools is the teachers' willingness for change. The individual and group reports of the diagnosis results seem to have made clear how essential individual and organisational changes are.

  15. Role and future subjects of support project 'research activity on radiation etc. by high school students'

    International Nuclear Information System (INIS)

    Iimoto, Takeshi; Fujimoto, Noboru; Nakamura, Takashi

    2014-01-01

    This is a report of the project of MEXT(The Ministry of Education, Culture, Sports, Science and Technology) to support high school students researching radiation etc. This subject research consists of an exchange meeting, independence research, and a presentation meeting of the results. Media introduced the project and this was a very reputable project. However, regrettably this support project was broken off in the business year of 2012. In this document, the outline of the support project for seven years is introduced and the possibility of future deployment is discussed. (author)

  16. Social barriers in wind power implementation in The Netherlands: Perceptions of wind power entrepreneurs and local civil servants of institutional and social conditions in realizing wind power projects

    International Nuclear Information System (INIS)

    Agterbosch, Susanne; Glasbergen, Pieter; Vermeulen, Walter J.V.

    2007-01-01

    The primary social factors for the implementation of wind energy projects in a liberalized market are entrepreneurs willing to invest. Understanding conditions that trigger entrepreneurs to invest in these projects, and understanding conditions that determine the chance of success for entrepreneurs to implement and exploit their projects, is vital for setting up effective policies to stimulate wind electricity generation. This paper analyses the way in which wind power entrepreneurs and local civil servants experience social and institutional conditions in the operational process of realizing wind power projects, and their perceptions of policy implications. A groups support system in an electronic board room was used to analyze the perceptions. From the analysis it was concluded that wind power entrepreneurs and civil servants share the opinion that the institutionally embedded power position of local politicians, and the sensitiveness of the local political debate for the popular opinion are most critical for project realization. With regard to the proposed solutions, both groups differ in their approach. Entrepreneurs stress procedural solutions, such as limiting the possibilities to appeal, reducing the complexity of the formal authorization trajectory and using a top down planning approach. Civil servants stress more strategic solutions, such as providing more public information on the necessity of wind power for local politicians and citizens, and community involvement in planning processes. Finally, the analysis explains that steering strategies that have been developed at the national level to solve the planning problems at the operational level do not address the right problems. (author)

  17. The Pedagogic Project as Provocative of the Collective Work in the School

    OpenAIRE

    Elaine Sampaio Araujo

    2007-01-01

    The objective of this article is to discuss, starting from the historical-cultural perspective, the sense of a pedagogic project considering its procedural nature, the convergence of the personal and collective dimensions and the educational purpose. The goal is to notice the project as possibility in the field pragmatic and in the theory of the sciences of human formation, linking the human development with the schools and its projects. For that, it tries to demonstrate that pedagogic projec...

  18. Implementation of a project-based engineering school: increasing student motivation and relevant learning

    Science.gov (United States)

    Terrón-López, María-José; García-García, María-José; Velasco-Quintana, Paloma-Julia; Ocampo, Jared; Vigil Montaño, María-Reyes; Gaya-López, María-Cruz

    2017-11-01

    The School of Engineering at Universidad Europea de Madrid (UEM) implemented, starting in the 2012-2013 period, a unified academic model based on project-based learning as the methodology used throughout the entire School. This model expects that every year, in each grade, all the students should participate in a capstone project integrating the contents and competencies of several courses. This paper presents the academic context under which this experience has been implemented, and a summary of the work done to design and implement the Project-Based Engineering School at the UEM. The steps followed, the structure used, some sample projects, as well as the difficulties and benefits of implementing the programme are discussed in this paper. The results are encouraging as students are more motivated and the initial set objectives were accomplished.

  19. Extreme Energy Events Project: Construction of the detectors and installation in Italian High Schools

    International Nuclear Information System (INIS)

    Abbrescia, M.; An, S.; Antolini, R.; Badala, A.; Baldini Ferroli, R.; Bencivenni, G.; Blanco, F.; Bressan, E.; Chiavassa, A.; Chiri, C.; Cifarelli, L.; Cindolo, F.; Coccia, E.; De Pasquale, S.; Di Giovanni, A.; D'Incecco, M.; Fabbri, F.L.; Frolov, V.; Garbini, M.; Gustavino, C.

    2008-01-01

    The EEE Project, conceived by its leader Antonino Zichichi, aims to detect Extreme Energy Events of cosmic rays with an array of muon telescopes distributed over the Italian territory. The Project involves Italian High Schools in order to introduce young people to Physics, also countervailing the recent crisis of university scientific classes inscriptions. The detectors for the EEE telescopes are Multigap Resistive Plate Chambers (MRPC) and have been constructed by teams of High School students who went in shift at the CERN laboratories. The mechanics and the electronics were developed by groups of researchers from CERN, the Italian Centro Fermi and INFN. The first group of schools of the EEE Project has inaugurated their telescopes recently. A status report of the Project and the preliminary results are presented

  20. Extreme Energy Events Project: Construction of the detectors and installation in Italian High Schools

    CERN Document Server

    Abbrescia, M; An, S; Antolini, R; Badalà, A; Baldini Ferroli, R; Bencivenni, G; Blanco, F; Bressan, E; Chiavassa, A; Chiri, C; Cifarelli, L; Cindolo, F; Coccia, E; De Pasquale, S; Di Giovanni, A; D’Incecco, M; Fabbri, F L; Frolov, V; Garbini, M; Gustavino, C; Hatzifotiadou, D; Imponente, G; Kim, J; La Rocca, P; Librizzi, F; Maggiora, A; Menghetti, H; Miozzi, S; Moro, R; Panareo, M; Pappalardo, G S; Piragino, G; Riggi, F; Romano, F; Sartorelli, G; Sbarra, C; Selvi, M; Serci, S; Williams, C; Zuyeuski, R

    2008-01-01

    The EEE Project, conceived by its leader Antonino Zichichi, aims to detect Extreme Energy Events of cosmic rays with an array of muon telescopes distributed over the Italian territory. The Project involves Italian High Schools in order to introduce young people to Physics, also countervailing the recent crisis of university scientific classes inscriptions. The detectors for the EEE telescopes are Multigap Resistive Plate Chambers (MRPC) and have been constructed by teams of High School students who went in shift at the CERN laboratories. The mechanics and the electronics were developed by groups of researchers from CERN, the Italian Centro Fermi and INFN. The first group of schools of the EEE Project has inaugurated their telescopes recently. A status report of the Project and the preliminary results are presented.

  1. Let's Plan the School Garden: A Participatory Project on Sustainability in a Nursery School in Padua

    Science.gov (United States)

    Rocca, Lorena; Donadelli, Giovanni; Ziliotto, Sonia

    2012-01-01

    The increasing complexity of urban regions and the lack of green areas in the neighborhoods have turned the cities less and less child-friendly. In order to locally face these situations, the project "Small steps of Agenda 21," which promoted a participatory planning experience for children focused on the green area of their school, was…

  2. Financing wind power projects : perspectives from the US market

    International Nuclear Information System (INIS)

    Alam, M.

    2005-01-01

    This presentation outlined the recent assignments, core competencies and scope of services provided by Alyra Renewable Energy Finance Advisors. Renewable energy developers seek Alyra's assistance in developing strategies to achieve the most competitive solutions in finance and strategy. Alyra has broad finance expertise in renewable energy projects, a deep knowledge of markets and a significant wind industry network. Alyra identifies emerging issues, completes financing solutions and helps with contract negotiations. This presentation outlined the notable features of wind financing, wind assessment, offtake arrangements, equity considerations, US wind debt markets, long term bank financing, and combined bank and private placement financing. It also included recent debt market activity for seven large wind farms in the United States. tabs., figs

  3. Current situation of the project of 3. and 4. block of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Suchy, L.

    2006-01-01

    The contribution shows the basic information about the crucial milestone of 3. building and the current situation of the project of 3. and 4. block of the nuclear power plant Mochovce. Contribution also shows what activities were realized and what material in area of designation of the technical and safety standard of the project was elaborated in the past, the main activities planned for 2006 have been described, support for Feasibility Study elaborated by ENEL and description of the integrated management system. The basic thesis crucial for the next steps on the project of 3. and 4. block of Nuclear Power Plant Mochovce is presented in the conclusion

  4. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  5. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  6. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  7. Guiding High School Students through Applied Internship Projects in College Environments: A Met School Story

    Science.gov (United States)

    Hassan, Said

    2012-01-01

    Many high school students are faced with the dilemma of "what next?" as they go through their final years at school. With new-economy jobs becoming more complex and career paths increasingly convoluted, the decision-making process is no simple task. What do these jobs and careers entail? How does what they are studying in school relate…

  8. School Reform Unplugged: The Bensenville New American School Project, 1991-93.

    Science.gov (United States)

    Mirel, Jeffrey

    1994-01-01

    This examination of the New American Schools Development Corporation initiative in Bensenville (Illinois) details the controversy over the reform effort and argues that factors such as school governance, local control, and school finance played major roles in determining program outcomes. The importance of political influences in reform efforts is…

  9. School Nurses' Role in Asthma Management, School Absenteeism, and Cost Savings: A Demonstration Project

    Science.gov (United States)

    Rodriguez, Eunice; Rivera, Diana Austria; Perlroth, Daniella; Becker, Edmund; Wang, Nancy Ewen; Landau, Melinda

    2013-01-01

    Background: With increasing budget cuts to education and social services, rigorous evaluation needs to document school nurses' impact on student health, academic outcomes, and district funding. Methods: Utilizing a quasi-experimental design, we evaluated outcomes in 4 schools with added full-time nurses and 5 matched schools with part-time nurses…

  10. Failure to Thrive? The Community Literacy Strand of the Additive Bilingual Project at an Eastern Cape Community School, South Africa

    Science.gov (United States)

    Hunt, George

    2007-01-01

    This paper discusses an attempt to establish community literacy procedures in an Eastern Cape community school. The school hosts the Additive Bilingual Education (ABLE) project, a cooperation between UK and South African universities and the school trust. The community literacy strand of the project encourages family members to contribute oral…

  11. Whole School Improvement and Restructuring as Prevention and Promotion: Lessons from STEP and the Project on High Performance Learning Communities.

    Science.gov (United States)

    Felner, Robert D.; Favazza, Antoinette; Shim, Minsuk; Brand, Stephen; Gu, Kenneth; Noonan, Nancy

    2001-01-01

    Describes the School Transitional Environment Project and its successor, the Project on High Performance Learning Communities, that have contributed to building a model for school improvement called the High Performance Learning Communities. The model seeks to build the principles of prevention into whole school change. Presents findings from…

  12. An applicable 5.8 GHz wireless power transmission system with rough beamforming to Project Loon

    Directory of Open Access Journals (Sweden)

    Chang-Jun Ahn

    2016-06-01

    Full Text Available In recent, Google proposed the Project Loon being developed with the mission of providing internet access to rural and remote areas using high-altitude balloons. In this paper, we describe an applicable prototype of 5.8 GHz wireless power transmission system with rough beamforming method to Project Loon. From the measurement results, transmit beamforming phased array antenna can transmit power more efficiently compared to a horn antenna and array antenna without beamforming with increasing the transmission distance. For the transmission distance of 1000 mm, transmit beamforming phased array antenna can obtain higher received power about 1.46 times compared to array antenna without transmit beamforming.

  13. SiC MOSFET Switching Power Amplifier Project Summary

    Science.gov (United States)

    Miller, Kenneth E.; Ziemba, Timothy; Prager, James; Slobodov, Ilia; Henson, Alex

    2017-10-01

    Eagle Harbor Technologies has completed a Phase I/II program to develop SiC MOSFET based Switching Power Amplifiers (SPA) for precision magnet control in fusion science applications. During this program, EHT developed several units have been delivered to the Helicity Injected Torus (HIT) experiment at the University of Washington to drive both the voltage and flux circuits of the helicity injectors. These units are capable of switching 700 V at 100 kHz with an adjustable duty cycle from 10 - 90% and a combined total output current of 96 kA for 4 ms (at max current). The SPAs switching is controlled by the microcontroller at HIT, which adjusts the duty cycle to maintain a specific waveform in the injector. The SPAs include overcurrent and shoot-through protection circuity. EHT will present an overview of the program including final results for the SPA waveforms. With support of DOE SBIR.

  14. Hybrid Cooling for Geothermal Power Plants: Final ARRA Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Bharathan, D.

    2013-06-01

    Many binary-cycle geothermal plants use air as the heat rejection medium. Usually this is accomplished by using an air-cooled condenser (ACC) system to condense the vapor of the working fluid in the cycle. Many air-cooled plants suffer a loss of production capacity of up to 50% during times of high ambient temperatures. Use of limited amounts of water to supplement the performance of ACCs is investigated. Deluge cooling is found to be one of the least-cost options. Limiting the use of water in such an application to less than one thousand operating hours per year can boost plant output during critical high-demand periods while minimizing water use in binary-cycle geothermal power plants.

  15. The International Successful School Principalship Project: Success Sustained?

    Science.gov (United States)

    Moos, Lejf; Johansson, Olof

    2009-01-01

    Purpose: The purpose of this paper is to synthesize the findings of the follow-up studies of successful school principals in six countries: Australia, Denmark, England, Norway, Sweden, and the USA. Design/methodology/approach: Data were categorized according to stakeholder expectations, the concept and practice of leadership, and the…

  16. GASB's New Financial Reporting Model: Implementation Project for School Districts.

    Science.gov (United States)

    Bean, David; Glick, Paul

    1999-01-01

    In June 1999, the Governmental Accounting Standards Board (GASB) issued its statement on the structure of the basic financial reporting model for state and local governments. Explains the new financial reporting model and reviews the implementation issues that school districts will need to address. (MLF)

  17. MENTORING. What can support projects achieve that schools cannot?

    NARCIS (Netherlands)

    Crul, M.R.J.; Schneider, Jens

    2014-01-01

    Mentoring and coaching is an established practice in corporate multinational firms worldwide, but mentoring programs for school pupils are still relatively new in Europe. This policy brief highlights a special kind of mentor: students in higher education with an immigrant background who can act as

  18. Guide for prioritizing power plant productivity improvement projects: handbook of availability improvement methodology

    International Nuclear Information System (INIS)

    1981-01-01

    As part of its program to help improve electrical power plant productivity, the Department of Energy (DOE) has developed a methodology for evaluating productivity improvement projects. This handbook presents a simplified version of this methodology called the Availability Improvement Methodology (AIM), which provides a systematic approach for prioritizing plant improvement projects. Also included in this handbook is a description of data taking requirements necessary to support the AIM methodology, benefit/cost analysis, and root cause analysis for tracing persistent power plant problems. In applying the AIM methodology, utility engineers should be mindful that replacement power costs are frequently greater for forced outages than for planned outages. Equivalent availability includes both. A cost-effective ranking of alternative plant improvement projects must discern between those projects which will reduce forced outages and those which might reduce planned outages. As is the case with any analytical procedure, engineering judgement must be exercised with respect to results of purely mathematical calculations

  19. Evaluation of authentic science projects on climate change in secondary schools: a focus on gender differences

    Science.gov (United States)

    Dijkstra, Elma; Goedhart, Martin

    2011-07-01

    Background and purpose This study examines secondary-school students' opinions on participating in authentic science projects which are part of an international EU project on climate change research in seven countries. Partnerships between schools and research institutes result in student projects, in which students work with and learn from scientists about the global carbon cycle. This study focuses in particular on differences between male and female students, as female students normally like traditional school science less than male students. Sample and design Data, drawn from 1370 students from 60 secondary schools across Europe, were collected through questionnaires taken at the end of the projects. The evaluated aspects were: organization; enjoyment; difficulty; and impact of the projects. Results The findings suggest that authentic science education is appreciated very much by both male students and even more by female students. The projects had positive impacts on climate change ideas, in particular for female students. Female students felt that they had learned many new things more often than male students. Conclusions Both male and female students have positive opinions about the authentic science projects. The results further point to positive effects of activities in which students have an active role, like hands-on experiments or presentation of results. The findings are placed in the international context of science education and their implications for policy are discussed.

  20. High stability power sources for bending and quadrupole magnets of TRISTAN project

    International Nuclear Information System (INIS)

    Kumagai, Noritaka; Ogawa, Shin-ichi; Koseki, Shoichiro; Nagasaka, Saburo.

    1985-01-01

    The excitation power sources for the main ring magnets of the TRISTAN project of the Ministry of Educations's National Laboratory for High Energy Physics requires strict performances of 10 -4 for both long time stability and the ripple factor of the DC output current to obtain a stable beam. To satisfy such specifications, a precision current detector, and active filter, and other such technologies are used for the power source. To verify the performance of this power source, a prototype was manufactured and a combined test was done with the magnets actually used at the National Laboratory. The results have proved that the output stability, ripple factor, current tracking, and other specifications are quite satisfactory and, at present, 80 sets have been manufactured for the TRISTAN project. This paper describes the project's power supply system and reports the results of performance tests on the prototype. (author)

  1. Projected role of nuclear power in Egypt and problems encountered in implementing the first nuclear power plant

    International Nuclear Information System (INIS)

    Effat, K.E.A.; Sirry, H.; El-Sharkawy, E.

    1977-01-01

    The increasing rise in fossil-fuel prices has favourably affected the economics of nuclear power generation bringing down the economically competitive size of nuclear units closer to small sizes compatible with grid capacities in developing countries. This encouraged Egypt to turn to nuclear power to fulfil its future power needs. In implementing its first nuclear power plant, Egypt is facing various problems. The capacity of the national electric power system and its inherent characteristics pose certain restrictions on the size and design of the nuclear plant required. The availability of sufficient local qualified management, engineering and technical personnel to participate in both precontractual and construction phases of the plant is quite a major problem. Lack of local developed industry to back up the construction phase implies the dependence to a large extent on imported equipment, materials and technology. The paper reviews the present and projected power demands in Egypt and the factors behind the decision to introduce a nuclear power generation programme. Various problems encountered and anticipated in introducing the first nuclear power plant are also discussed. (author)

  2. School nurses' role in asthma management, school absenteeism, and cost savings: a demonstration project.

    Science.gov (United States)

    Rodriguez, Eunice; Rivera, Diana Austria; Perlroth, Daniella; Becker, Edmund; Wang, Nancy Ewen; Landau, Melinda

    2013-12-01

    With increasing budget cuts to education and social services, rigorous evaluation needs to document school nurses' impact on student health, academic outcomes, and district funding. Utilizing a quasi-experimental design, we evaluated outcomes in 4 schools with added full-time nurses and 5 matched schools with part-time nurses in the San Jose Unified School District. Student data and logistic regression models were used to examine predictors of illness-related absenteeism for 2006-2007 and 2008-2009. We calculated average daily attendance (ADA) funding and parent wages associated with an improvement in illness-related absenteeism. Utilizing parent surveys, we also estimated the cost of services for asthma-related visits to the emergency room (ER; N = 2489). Children with asthma were more likely to be absent due to illness; however, mean absenteeism due to illness decreased when full-time nurses were added to demonstration schools but increased in comparison schools during 2008-2009, resulting in a potential savings of $48,518.62 in ADA funding (N = 6081). Parents in demonstration schools reported fewer ER visits, and the estimated savings in ER services and parent wages were significant. Full-time school nurses play an important role in improving asthma management among students in underserved schools, which can impact school absenteeism and attendance-related economic costs. © 2013, American School Health Association.

  3. Power: Constitutional Update. Bar/School Partnership Programs Series.

    Science.gov (United States)

    American Bar Association, Chicago, IL. Special Committee on Youth Education for Citizenship.

    The fourth in a special series of handbooks dealing with constitutional themes, this document looks at power in the context of the U.S. Constitution. "The Constitution's Prescription for Freedom" (L. Peach) examines the separation of powers provided for in the Constitution. "The Concept of Power" (C. Roach) is a series of…

  4. A new market risk model for cogeneration project financing---combined heat and power development without a power purchase agreement

    Science.gov (United States)

    Lockwood, Timothy A.

    Federal legislative changes in 2006 no longer entitle cogeneration project financings by law to receive the benefit of a power purchase agreement underwritten by an investment-grade investor-owned utility. Consequently, this research explored the need for a new market-risk model for future cogeneration and combined heat and power (CHP) project financing. CHP project investment represents a potentially enormous energy efficiency benefit through its application by reducing fossil fuel use up to 55% when compared to traditional energy generation, and concurrently eliminates constituent air emissions up to 50%, including global warming gases. As a supplemental approach to a comprehensive technical analysis, a quantitative multivariate modeling was also used to test the statistical validity and reliability of host facility energy demand and CHP supply ratios in predicting the economic performance of CHP project financing. The resulting analytical models, although not statistically reliable at this time, suggest a radically simplified CHP design method for future profitable CHP investments using four easily attainable energy ratios. This design method shows that financially successful CHP adoption occurs when the average system heat-to-power-ratio supply is less than or equal to the average host-convertible-energy-ratio, and when the average nominally-rated capacity is less than average host facility-load-factor demands. New CHP investments can play a role in solving the world-wide problem of accommodating growing energy demand while preserving our precious and irreplaceable air quality for future generations.

  5. Purposes and related aspects of the nuclear power plant aging Project

    International Nuclear Information System (INIS)

    Garaud, J.; Reynes, L.; Montardy, A. de

    1989-01-01

    The purposes and some aspects of the nuclear power plant Lifetime project is presented. The work is focused on the study of the aging of the PWR type power plant components. The project consists in two phases. The first one involves: the status reports and the analysis of the lifetime data of the most sensitive units, as well as the applied actions and proposals, the influence of the exploitation modes, the safety and the cost prospectives. The second phase includes: the definition, the contracts, the complementary actions and their achievement, the reasons and the surveyance improvements, the development of the decision supporting means, the summary and the conclusions. The selected units for the project first step and the project of actions, are listed. The first conclusions of the project show that most of the 900 MW PWR reactor components will have about 40 years of service life [fr

  6. The roots of violence: converging psychoanalytic explanatory models for power struggles and violence in schools.

    Science.gov (United States)

    Twemlow, S W

    2000-10-01

    This paper demonstrates that several psychoanalytic models taken together converge to collectively explain school violence and power struggles better than each does alone. Using my own experience in doing psychoanalytically informed community intervention, I approach the problem of school violence from a combination of Adlerian, Stollerian, dialectical social systems, and Klein-Bion perspectives. This integrated model is then applied to the Columbine High School massacre in Littleton, Colorado.

  7. Clean air school buildings and governmental subsidy. Project ventiLation; Frisse scholen dankzij regeringssubsidie. Project VentiLeren

    Energy Technology Data Exchange (ETDEWEB)

    Luigjes, B.; De Wit, J.W. [Rucon Ventilatoren, Harderwijk (Netherlands)

    2010-03-15

    The Dutch government has provided local authorities with 100 million euros to address the polluted air in class rooms of primary schools. However, this amount is not sufficient to solve the problem entirely. This problem has been solved by linking the implementation to a project dedicated to combating youth unemployment, named 'VentiLeren'. [Dutch] De Nederlandse overheid heeft 100 miljoen euro beschikbaar gesteld aan gemeenten om de vervuilde lucht in de lokalen van basisscholen aan te pakken. Dit bedrag is echter ontoereikend om het hele probleem op te lossen. Door de uitvoering ervan te koppelen aan een project ter bestrijding van jeugdwerkloosheid, ventiLeren genaamd, wordt dit opgelost.

  8. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; O' Neill, Barbara

    2016-01-21

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of

  9. Conference on wind power development in the face of landscape and local project acceptability challenges

    International Nuclear Information System (INIS)

    Victoire Lejzerzon; Sauron, Claire; Villot, Marie; Ratzbor, Guenter; Tausch, Christian; Cagneaux, Bertrand; Jouneau, Agathe; Stemmer, Boris; Huebner, Gundula; Orozco-Souel, Paola; Lhermitte, Charles; Ferus, Elisabeth; Benezech, Philippe; Gunzelmann, Thomas

    2015-01-01

    The French-German office for Renewable energies (OFAEnR) organised a conference on n wind power development in the face of landscape and local project acceptability challenges. In the framework of this French-German exchange of experience, participants addressed the following points: the conciliation between landscape protection and wind power development, the definition of landscape environmental quality criteria, the needs and usages of the departments in charge of the treatment of landscape studies in France, the socio-psychological approach of the local acceptability of wind farm projects, the re-powering tool for the improvement of the wind farm integration in the landscape, and the conciliation between the monuments maintenance and wind power development. This document brings together the available presentations (slides) made during this event: 1 - Conciliating landscape protection and wind power development goals in France (Marie Villot); 2 - Wind turbines: Conflicts between development goals, landscape and acceptance - Perception and criteria (Guenter Ratzbor); 3 - Bayern's wind power atlas: a planning tool which takes into account the landscape aspects (Christian Tausch); 4 - Landscape assessment in wind farms projects: what and how to do in French administrative procedures? (Bertrand Cagneaux); 5 - Methods for evaluation of landscape for wind farms projects - A French project developer's feedback (Agathe Jouneau); 6 - Landscape Assessment: Methods from German Landscape Practice (Boris Stemmer); 7 - Acceptance of Wind Turbines - Social Psychological Research (Gundula Huebner); 8 - Local consultation: who to involve, when and how? (Paola Orozco-Souel); 9 - Local acceptability: what dialogue concepts and strategies, and how to manage wind energy objection (Charles Lhermitte); 10 - Re-powering and landscape: chances and limits (Elisabeth Ferus); 11 - Wind power and cultural heritage: consultation and dialogue to succeed (Philippe Benezech); 12

  10. Relationship between School Administrators' Organizational Power Sources and Teachers' Organizational Citizenship Behaviors

    Science.gov (United States)

    Altinkurt, Yahya; Yilmaz, Kursad

    2012-01-01

    The main purpose of the research was to determine correlation between school administrators' organizational power sources and teachers' organizational citizenship behaviors in primary schools. The research was a correlational survey model study. 275 participants were randomly chosen for the research. The data were collected by…

  11. High School Students' Perceptions of and Attitudes towards Teacher Power in the Classroom

    Science.gov (United States)

    Koutrouba, Konstantina; Baxevanou, Eleni; Koutroumpas, Athanasios

    2012-01-01

    The present study examines Greek High School students' perceptions of and attitudes towards their teachers' power, from findings produced during a questionnaire-based study conducted in the period 2010-2011, with the participation of 1076 students attending 68 schools across Greece. Greek students provided information on how their teachers exert…

  12. Powerful versus Popular: Definition and Distinction of Social Vocabulary in the Middle School

    Science.gov (United States)

    Burwell, Julie; Stone, Robert

    2012-01-01

    Two middle school teachers consider the function of the word popular in middle school life and illustrate that the lesser used term powerful is often more applicable. They offer an alternative vocabulary for social standing and examine the factors that can influence that standing. By discussing the manifold ways that the social life of students…

  13. Repetition and Power Imbalance in Bullying Victimization at School. Data Point. NCES 2018-093

    Science.gov (United States)

    Lessne, Deborah; Yanez, Christine

    2018-01-01

    For the 2014-2015 school year, 20.8 percent of students reported being bullied at school. This report examines these students' experiences of bullying by repetition and power imbalance, two components of the Center for Disease Control and Prevention's (CDC) uniform definition of bullying. The report reviews the association of these components with…

  14. Total Quality Education: Profiles of Schools That Demonstrate the Power of Deming's Management Principles.

    Science.gov (United States)

    Schmoker, Michael J.; Wilson, Richard B.

    This book presents profiles of schools that have demonstrated the power of Deming's Total Quality Management (TQM) principles. It describes schools that have successfully applied those strategies for change. The book explores what public education needs most--a compelling but flexible action plan for improvement. Chapter 1 offers a rationale for…

  15. Service-learning and learning communities: two innovative school projects that are mutually enriched

    Directory of Open Access Journals (Sweden)

    Carmen ÁLVAREZ ÁLVAREZ

    2015-12-01

    Full Text Available This article reflects on the interrelationships that exist between two educational projects of today: service-learning (ApS and learning communities (CdA. The ApS is an educational methodology applied worldwide where a single project combines a learning based on experience with the implementation of a service to the community. CdA is a school transformation project to achieve that the information society does not exclude any person, constituting a reality in more than one hundred and ninety schools in Spain and Latin America. Between the two, it is possible to show differences, especially in what refers to its theoretical substrates, but in actual teaching practice in schools there is some harmony, particularly in the so closely that they cultivate both projects with the school community. Therefore, we conclude that service-learning and learning communities can occur as two innovative and relevant today projects which can be mutually enriching: because for both the approach school-community-environment and volunteering is essential.

  16. Grassroots Technological Resistance: The People's Power Project and the Impossible Dream of Wireless Transmission of Energy.

    Science.gov (United States)

    Schmidt, Pete

    2017-09-01

    In 1972, the Minnesota United Power Association (UPA) teamed up with the Minnesota Cooperative Power Association (CPA) to initiate an electrification project designed to bring power from North Dakota to the Twin Cities area. A significant backlash and protest began once farmers across the state became aware of the plan and the potential impending land seizure. In the midst of these actions, one group sought to create an alternative to the power line transmission system by designing a system of wireless energy transmission based on the plans of Nikola Tesla. This self-funded conglomeration of farmers and amateur researchers formed the People's Power Project (PPP) and set about building Tesla's system for the wireless transmission of energy. Using archival documents, this paper recounts this episode and argues that, in this case, the potential for successful grassroots action was derailed by the influence of longstanding myths about Tesla and his devices. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. [Restoration filtering based on projection power spectrum for single-photon emission computed tomography].

    Science.gov (United States)

    Kubo, N

    1995-04-01

    To improve the quality of single-photon emission computed tomographic (SPECT) images, a restoration filter has been developed. This filter was designed according to practical "least squares filter" theory. It is necessary to know the object power spectrum and the noise power spectrum. The power spectrum is estimated from the power spectrum of a projection, when the high-frequency power spectrum of a projection is adequately approximated as a polynomial exponential expression. A study of the restoration with the filter based on a projection power spectrum was conducted, and compared with that of the "Butterworth" filtering method (cut-off frequency of 0.15 cycles/pixel), and "Wiener" filtering (signal-to-noise power spectrum ratio was a constant). Normalized mean-squared errors (NMSE) of the phantom, two line sources located in a 99mTc filled cylinder, were used. NMSE of the "Butterworth" filter, "Wiener" filter, and filtering based on a power spectrum were 0.77, 0.83, and 0.76 respectively. Clinically, brain SPECT images utilizing this new restoration filter improved the contrast. Thus, this filter may be useful in diagnosis of SPECT images.

  18. Restoration filtering based on projection power spectrum for single-photon emission computed tomography

    International Nuclear Information System (INIS)

    Kubo, Naoki

    1995-01-01

    To improve the quality of single-photon emission computed tomographic (SPECT) images, a restoration filter has been developed. This filter was designed according to practical 'least squares filter' theory. It is necessary to know the object power spectrum and the noise power spectrum. The power spectrum is estimated from the power spectrum of a projection, when the high-frequency power spectrum of a projection is adequately approximated as a polynomial exponential expression. A study of the restoration with the filter based on a projection power spectrum was conducted, and compared with that of the 'Butterworth' filtering method (cut-off frequency of 0.15 cycles/pixel), and 'Wiener' filtering (signal-to-noise power spectrum ratio was a constant). Normalized mean-squared errors (NMSE) of the phantom, two line sources located in a 99m Tc filled cylinder, were used. NMSE of the 'Butterworth' filter, 'Wiener' filter, and filtering based on a power spectrum were 0.77, 0.83, and 0.76 respectively. Clinically, brain SPECT images utilizing this new restoration filter improved the contrast. Thus, this filter may be useful in diagnosis of SPECT images. (author)

  19. Teaching weather and climate science in primary schools - a pilot project from the UK Met Office

    Science.gov (United States)

    Orrell, Richard; Liggins, Felicity; Challenger, Lesley; Lethem, Dom; Campbell, Katy

    2017-04-01

    Wow Schools is a pilot project from the Met Office with an aim to inspire and educate the next generation of scientists and, uniquely, use the data collected by schools to improve weather forecasts and warnings across the UK. Wow Schools was launched in late 2015 with a competition open to primary schools across the UK. 74 schools entered the draw, all hoping to be picked as one of the ten lucky schools taking part in the pilot scheme. Each winning school received a fully automatic weather station (AWS), enabling them to transmit real-time local weather observations to the Met Office's Weather Observation Website (WOW - wow.metoffice.gov.uk), an award winning web portal for uploading and sharing a range of environmental observations. They were also given a package of materials designed to get students out of the classroom to observe the weather, get hands-on with the science underpinning weather forecasting, and analyse the data they are collecting. The curriculum-relevant materials were designed with the age group 7 to 11 in mind, but could be extended to support other age groups. Each school was offered a visit by a Wow Schools Ambassador (a Met Office employee) to bring the students' learning to life, and access to a dedicated forecast for its location generated by our new supercomputer. These forecasts are improved by the school's onsite AWS reinforcing the link between observations and forecast production. The Wow Schools pilot ran throughout 2016. Here, we present the initial findings of the project, examining the potential benefits and challenges of working with schools across the UK to: enrich students' understanding of the science of weather forecasting; to source an ongoing supply of weather observations and discover how these might be used in the forecasting process; and explore what materials and business model(s) would be most useful and affordable if a wider roll-out of the initiative was undertaken.

  20. The international school nurse asthma project: barriers related to asthma management in schools.

    Science.gov (United States)

    Svavarsdottir, Erla Kolbrun; Garwick, Ann W; Anderson, Lori S; Looman, Wendy S; Seppelt, Ann; Orlygsdottir, Brynja

    2013-05-01

    This article is a report of an international study of barriers to asthma care from the perspectives of school nurses in Reykjavik, Iceland and St. Paul, Minnesota, in the context of their schools, communities and countries. Globally, asthma affects the health and school performance of many adolescents. School nurses play a key role by providing care to adolescents with asthma in school settings. Understanding universal barriers to asthma management in schools is important for developing interventions that are effective in multiple societal contexts. Exploratory, descriptive study. Parallel studies were conducted from September 2008-January 2009, through six focus groups among school nurses (n = 32, in Reykjavik n = 17 and St. Paul n = 15) who were managing asthma in adolescents. Focus groups were audio-recorded and transcribed verbatim in English or Icelandic. The Icelandic transcripts were translated into English. Descriptive content analytic techniques were used to systematically identify and categorize types of barriers to asthma care. School nurses in both countries identified common barriers, such as time constraints, communication challenges and school staff barriers. The primary difference was that St. Paul school nurses identified more socio-economic and health access barriers than school nurses in Reykjavik. Greater cultural and linguistic diversity and socio-economic differences in the student population in St. Paul and lack of universal healthcare coverage in the US contributed to school nurses' need to focus more on asthma management than school nurses in Reykjavik, who were able to focus more on asthma prevention and education. © 2012 Blackwell Publishing Ltd.

  1. Solidarity Projects in Norwegian Schools: Students' Motivation and School Leaders' Rationale

    OpenAIRE

    Brustad, Maja Rosvold

    2014-01-01

    Abstract Each year thousands of Norwegian students spend one day of their education to collect money for different aid projects. These projects aim at giving youth in developing countries the opportunity to education and are referred to as Solidarity Projects. The projects are organized by different NGO s. The first organizations that started offering solidarity projects were Operation Day´s Work. This organization was founded in 1964, and is run for, by and with youth. Participation in solid...

  2. Franchise project for the Wettingen power plant; Konzessionsprojekt Kraftwerk Wettingen

    Energy Technology Data Exchange (ETDEWEB)

    Operto, G. [Elektrizitaetswerk der Stadt Zuerich EWZ, Zurich (Germany); Zimmermann, C. [Creato, Netzwerk fuer kreative Umweltplanung, Ennetbaden (Switzerland)

    1999-02-05

    Even today, after 65 years of operation, the Wettingen hydroelectric power plant of EWZ still retains many of its original components. They are technically obsolete and need to be replaced. Investments to be made by the municipal works of Zurich (EWZ) are of the order of magnitude of 60 to 70 million Swiss francs. These investments will not have paid back by the time the franchise expires in 2013; therefore, the city of Zurich is negotiating with the two franchise givers, the canton governments of Aargau and Zurich, seeking to obtain premature renewal of the franchise under which it is entitled to use the water rights. Thanks to the installation of a new turbine in the retaining weir, it will then be possible to increase residual water flow over the distance of 1300 metres twelve to twenty-fold. (orig.) [Deutsch] Noch heute, nach 65 Betriebsjahren, bestehen viele Anlageteile des EWZ-Flusskraftwerks Wettingen im Originalzustand. Sie sind technisch veraltet und muessen deshalb erneuert werden. Die geplante Erneuerung erfordert vom Elektrizitaetswerk der Stadt Zuerich (EWZ) Investitionen in der Groessenordnung von 60 bis 70 Millionen Franken. Da sich diese Investitionen bis zum Ablauf der Konzession im Jahre 2013 nicht amortisieren lassen, verhandelt die Stadt Zuerich mit den beiden Konzessionsgebern, den Kantonen Aargau und Zuerich, um eine vorzeitige Erneuerung der Konzession zur Nutzung der Wasserrechte zu erhalten. Dank dem Einbau einer neuen Dotierturbine im Stauwehr wird es dann moeglich sein, die Wasserfuehrung in der 1300 m langen Restwasserstrecke auf das Zwoelf- bis Zwanzigfache des heutigen Wertes zu erhoehen. (orig.)

  3. NORSTAR Project: Norfolk public schools student team for acoustical research

    Science.gov (United States)

    Fortunato, Ronald C.

    1987-01-01

    Development of the NORSTAR (Norfolk Public Student Team for Acoustical Research) Project includes the definition, design, fabrication, testing, analysis, and publishing the results of an acoustical experiment. The student-run program is based on a space flight organization similar to the Viking Project. The experiment will measure the scattering transfer of momentum from a sound field to spheres in a liquid medium. It is hoped that the experimental results will shed light on a difficult physics problem - the difference in scattering cross section (the overall effect of the sound wave scattering) for solid spheres and hollow spheres of differing wall thicknesses.

  4. Fuel Cell-Powered Go-Kart: Project Mimics Real-World Product Development

    Science.gov (United States)

    Fuller, Amanda

    2010-01-01

    Five years ago, Leon Strecker's technology education class at Darien High School came up with the idea of building a fuel cell-powered go-kart. In previous years, the class had worked on other creations, such as electric cars that competed in a state-sponsored race and a full-size hovercraft. But students had not taken on anything anywhere near…

  5. The Sydvaerme project: District heating from the Barsebeck nuclear power plant

    International Nuclear Information System (INIS)

    Josefsson, L.

    1977-01-01

    The paper presents a summary report of a study on district heating from Barsebeck Nuclear Power Plant in Sweden, prepared cooperatively by the cities of Malmoe, Lund, Helsingborg, Landskrona and the electric power company Sydkraft. A future number 3 generating set at the Barsebeck nuclear power station could be designed for combined production of heat and electric power. The generating set could be completed after 1983, and could then supply about 65% of total district heating requirements. The first stage of the investigation includes a proposal for a technically feasible solution, sufficiently detailed to permit both technical and economic evaluation of the project. (author)

  6. The power of community : the role of ownership in social marketing of wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Roscoe, D. [Scotian Windfields, Dartmouth, NS (Canada)

    2008-07-01

    This paper discussed the benefits of community ownership for wind power projects in Nova Scotia. The community economic development investment fund (CEDIF) is a pool of capital funds formed by selling shares to people within a defined community. CEDIFs are created to operate or invest in local business as part of a government initiative to provide incentives for local business development. Those eligible for CEDIFs include incorporated organizations with a minimum of 25 investors, and when 6 of the maximum 12 directors are from the local community. No investors may own more than 20 per cent. CEDIF incentives include pre-approved holdings for registered savings plans; a 30 per cent non-refundable equity tax credit against Nova Scotia taxes, and additional credits for maintaining investment. Local WindFields investors have invested in the Scotian WindFields in order to develop renewable energy projects. Community ownership of wind power projects can result in greater acceptance of wind power as well as increased economic prosperity and employment. Community ownership can also lead to improved land lease opportunities and relationships between contractors, local businesses, and federal and provincial governments. Details of wind power projects in Nova Scotia were provided. It was concluded that wind power developers should consider community ownership of wind projects. tabs., figs.

  7. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  8. Impact of financial institution environmental guidelines on international power generation projects

    International Nuclear Information System (INIS)

    Macak, J.J. III; Schott, G.A.

    1995-01-01

    Where financing is concerned, two major players for US based international power projects are The World Bank and the Export-Import Bank of the US (Ex-Im Bank). The concern for environmental protection is a global issue, yet many countries still have no enforceable environmental regulations for power generation facilities. In the past, many projects were developed with little or no environmental controls. However, designing a power generation project to meet The World Bank environmental guidelines is now generally regarded as standard practice for independent power projects in the developing world (Price et al, 1994). The World Bank standards are mandatory for projects financed by The World Bank, through the International Finance Corporation (IFC), or associated programs like the Expanded Cofinancing Program of the International Bank for Reconstruction and Development (IBRD). The Ex-Im Bank has recently established new environmental procedures and guidelines that went into effect on February 1, 1995. In order to avoid a competitive disadvantage for US exporters and still provide a means for global environmental protection, Ex-Im Bank has taken a leadership role in encouraging the adoption of common environmental procedures and standards by leading export credit agencies around the world. Until such procedures are established, Ex-Im Bank is seeking to establish common lines in specific cases with the Organization for Economic Cooperation and Development (OECD) on environmental standards for appropriate projects (Ex-Im, 1994)

  9. Study of tidal power projects in the UK, with the exception of the Severn barrage

    International Nuclear Information System (INIS)

    Shaw, T.L.

    1997-01-01

    Several estuaries in the UK could be equipped with barrages and tidal power plants and several projects were proposed and studied from the end of the 1960's and 1989, until the electric power industry was privatized. Five projects revealed to be more promising than others: the Conwy estuary in the north of Wales, for which the feasibility study concluded that there was no serious environmental constraints on the project; Duddon, a little bit more in the north, which appears to be not economically interesting; Loughor, in the south of Wales, a small size project for which no advanced ecological consequences studies were carried out; Mersey, near Liverpool, the most important project (700 MW) which stands a good chance of being realized; the Wyre estuary, between Duddon and Mersey, for which the cost seems to be prohibitive. The economical conditions which started in the 1980's are largely responsible for the stand-by of any of these projects. The tide power kWh production cost continues to be viewed as two times more expensive than it would be with a classical power plant. Of course, this cost takes into account the actions for environmental protection. (J.S.)

  10. Power quality affects teacher wellbeing and student behavior in three Minnesota Schools

    International Nuclear Information System (INIS)

    Havas, Magda; Olstad, Angela

    2008-01-01

    Background: Poor power quality (dirty electricity) is ubiquitous especially in schools with fluorescent lights and computers. Previous studies have shown a relationship between power quality and student behavior/teacher health. Objectives: The purpose of this study is to determine the ability of power line filters to reduce dirty electricity in a school environment and to document changes in health and behavior among teachers and students. Method: We installed Graham Stetzer filters and dummy filters and measured power quality in three Minnesota Schools. Teachers completed a daily questionnaire regarding their health and the behavior of their students for an 8-week period. Teachers were unaware of which filters were installed at any one time (single blind study). Results: Dirty electricity was reduced by more than 90% in the three schools and during this period teacher health improved as did student behavior in the middle/elementary schools. Headaches, general weakness, dry eyes/mouth, facial flushing, asthma, skin irritations, overall mood including depression and anxiety improved significantly among staff. Of the 44 teachers who participated 64% were better, 30% were worse, and 6% did not change. Behavior of high school students did not improve but elementary/middle school students were more active in class; more responsive, more focused; had fewer health complaints; and had a better overall learning experience. Conclusions: Dirty electricity in schools may be adversely affecting wellbeing of teachers and behavior of their students, especially younger students in middle and elementary school. Power line filters improve power quality and may also protect those who are sensitive to this energy. Work on electric and magnetic field metrics with and without Stetzer filters urgently needs to be carried out to determine just what characteristics of the dirty electricity may be interacting with the people

  11. DNA Fingerprinting of Trout Lilies: A High School Student Project.

    Science.gov (United States)

    Vann, Carolyn N.; Saxon, Herbert L.; Brblic, Tom; Elliades, Stacie; Lambert, Scott; Shaw, Jake; Smith, Ryan; Inman, Megan

    1998-01-01

    Reports on a student's research project on the degree of genetic diversity within the trout lily species. Enables a rough prediction of the continuance of the species and provides insight into how to manage plants that might be endangered. Contains 16 references. (DDR)

  12. [Mental health promotion in school with school coaches: evaluation of a pilot project].

    Science.gov (United States)

    Corrieri, Sandro; Conrad, Ines; Riedel-Heller, Steffi G

    2015-03-01

    How did the work of four school coaches in five Saxonian schools influence children's and adolescents' psychosocial development? At three points in time, students at intervention (N = 292) and control schools (N = 300) were evaluated concerning their social distance towards mentally ill people and their help-seeking behavior in case of crisis. The survey also included teachers (N = 323) and parents (N = 370). Data analysis was done descriptively and with random effects models. The social distance of the intervention schools declined significantly compared to the control schools. Having heard or read about mental illnesses, or personally knowing somebody affected by mental illness, led to less social distance and more empathy. Information increased the confidence to receive help from a professional consultant. Friends and family were the main reference groups. The school coaches were accepted as confidential persons and helped with school and private issues. The school coaches' work showed positive influence on all members of the school system. © Georg Thieme Verlag KG Stuttgart · New York.

  13. A Project-Centric Course on Cyberinfrastructure to Support High School STEM Education

    Directory of Open Access Journals (Sweden)

    Daphne Rainey

    2013-06-01

    Full Text Available Recent rapid advances in information technology pose new challenges for teachers in the Science, Technology, Engineering, and Mathematics (STEM fields to incorporate the latest knowledge and technical expertise into courses in a way that will be applicable to students as future scientists. A demonstration project was designed, developed, and deployed by university faculty and high school teachers for their students to explore the use of the components of cyberinfrastructure. The project explored the introduction of cyberinfrastructure through the use of bioinformatics and the use of team science. This paper describes the high school course that was deployed at Galileo Magnet High School (GMHS in collaboration with the scientists at Virginia Tech University, and details its overall assessment. Implementation of a project-centric teaching paradigm to engage students in applying the concepts of cyberinfrastructure by integrating the disciplines of biology, computer science, mathematics, and statistics through bioinformatics was an integral part of this study.

  14. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  15. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  16. Final project report: TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1993-02-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project including, Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 M 3 of mixed waste

  17. Final project report, TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1992-01-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project, including Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 m 3 of low-level solid radioactive waste and 5 m 3 of mixed waste

  18. Public School Finance Assessment Project Aligned with ELCC Standards

    Science.gov (United States)

    Risen, D. Michael

    2008-01-01

    This is a detailed description of an assessment that can be used in a graduate level of study in the area of public school finance. This has been approved by NCATE as meeting all of the stipulated ELCC standards for which it is designed (1.1, 1.2, 1.3, 1.4, 1.5, 2.1, 2.2, 2.3, 2.4, 3.1, 3.2, 3.3, 4.1, 4.2, 4.3, 5.1, 5.2, 5.3.). This course of…

  19. Restoration and construction (buildings). Solar electric power. How to complete a photovoltaic project

    International Nuclear Information System (INIS)

    Bareau, Helene; Juniere, Olivier

    2017-10-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic but comprehensive outlook on the way to complete a solar photovoltaic project in the cases of the restoration or the construction of a building. After a presentation of solar energy, its transformation into electric power, and the installation of solar photovoltaic panels and equipment, the brochure exposes the various steps of a photovoltaic project: economic analysis (cost estimation, budgets, financing incentives, power prices, the choice between selling or using electric power, the contracts, etc.), the planning of the project, the administrative procedure, the selection of a professional installer, how to run the photovoltaic system, how to run the business, etc

  20. Summary of developments and future projects in nuclear power plant control and instrumentation in the Netherlands

    International Nuclear Information System (INIS)

    Plas, Y. van der

    1990-01-01

    A general view is given on the developments and trends due to instrumentation and control of the two nuclear power plants in the Netherlands around the year 1989. Several projects, under which for classification of systems and components and for emergency operating procedures, are executed in both plants. An OSART mission initiated a project to make possible the periodic test of safety commands during operation. An other large project concerned the replacement of the process presentation system in Nuclear Power Plant Borssele. In the article several other developments due to the application of I and C in existing plants are outlined generally. Since 1974, no new nuclear power plants have been constructed in the Netherlands. (author). 2 figs