WorldWideScience

Sample records for school renovation project

  1. Solar renovation demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Bruun Joergensen, O [ed.

    1998-10-01

    In the framework of the IEA SHC Programme, a Task on building renovation was initiated, `Task 20, Solar Energy in Building Renovation`. In a part of the task, Subtask C `Design of Solar Renovation Projects`, different solar renovation demonstration projects were developed. The objective of Subtask C was to demonstrate the application of advanced solar renovation concepts on real buildings. This report documents 16 different solar renovation demonstration projects including the design processes of the projects. The projects include the renovation of houses, schools, laboratories, and factories. Several solar techniques were used: building integrated solar collectors, glazed balconies, ventilated solar walls, transparent insulation, second skin facades, daylight elements and photovoltaic systems. These techniques are used in several simple as well as more complex system designs. (au)

  2. Energy Use and Indoor Climate in Two Schools Before and After Deep Energy Renovation

    DEFF Research Database (Denmark)

    Rose, Jørgen; Thomsen, Kirsten Engelund; Mørck, Ove

    2013-01-01

    . The 7 buildings are being energy renovated and monitored with support from the EU-CONCERTO initiative as part of the project “Cost-effective Low-energy Advanced Sustainable So1utions – Class1”. The buildings are very different and therefore the energy renovations to take place will also vary from...... insulation of piping and improved control (Building Energy Management Systems – BEMS). This paper presents preliminary results of analysis and monitoring of energy use and indoor climate in the two public schools before and after deep energy renovation....

  3. Development of Facilities Master Plan and Laboratory Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Andrea D

    2011-10-03

    Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the School's overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

  4. Integrated project delivery methods for energy renovation of social housing

    Directory of Open Access Journals (Sweden)

    Tadeo Baldiri Salcedo Rahola

    2015-11-01

    Full Text Available Optimised project delivery methods forsocial housing energy renovations European Social Housing Organisations (SHOs are currently facing challenging times. The ageing of their housing stock and the economic crisis, which has affected both their finances and the finances of their tenants, are testing their capacity to stick to their aim of providing decent and affordable housing. Housing renovation projects offer the possibility of upgrading the health and comfort levels of their old housing stock to current standards and improve energy efficiency, and this solution also addresses the fuel poverty problems suffered by some tenants. Unfortunately, the limited financial capacity of SHOs is hampering the scale of housing renovation projects and the energy savings achieved.  At the same time, the renovation of the existing housing stock is seen as one of the most promising alternative routes to achieving the ambitious CO2 emissions reduction targets set by European authorities – namely, to reduce EU CO2 emissions to 20% below their 1990 levels by 2020. The synergy between European targets and the aims of SHOs has been addressed by the energy policies of the member states, which focus on the potential energy savings achievable by renovating social housing. In fact, the European initiatives have prioritised energy savings in social housing renovations to such an extent that these are referred to as ‘energy renovations’. Energy renovation is therefore a renovation project with higher energy savings target than a regular renovation project. In total, European SHOs own 21.5 million dwellings representing around 9.4% of the total housing stock. Each SHO owns a large number of dwellings, which means there are fewer people to convince of the need to make energy savings through building renovations, maximising the potentially high impact of decisions. Moreover, SHOs are responsible for maintaining and upgrading their properties in order to continue

  5. Historic Schools: Renovation vs. Replacement & the Role of a Feasibility Study.

    Science.gov (United States)

    National Trust for Historic Preservation, Washington, DC.

    Weighing the pros and cons of renovating a historic neighborhood school or building a new one takes preservation "know-how," experience, and creativity. The potential for renovation is routinely dismissed without full consideration of the facts and long-term implications. Central to this decision-making process is the feasibility study,…

  6. Analysis and Monitoring of Energy Consumption and Indoor Climate in a School Before and After Deep Energy Renovation

    DEFF Research Database (Denmark)

    Rose, Jørgen; Thomsen, Kirsten Engelund; Bergsøe, Niels Christian

    2015-01-01

    kindergartens/institutions -- that will undergo deep energy renovation over the next fewyears.The seven buildings are being energy-renovated and monitored with support from the European Union- CONCERTO initiative as part of the project titled Cost-Effective Low-Energy Advanced Sustainable Solutions -- Class1...... ventilation systems with heat recovery, low-energy lighting, water-saving measures, improved insulation of piping, and improved control using building energy management systems. This paper presents preliminary results of the analysis and monitoring of energy consumption and indoor climate in one public school...

  7. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    Science.gov (United States)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  8. Success and fail factors in sustainable real estate renovation projects

    NARCIS (Netherlands)

    Volker, L.

    2011-01-01

    Sustainability remains an important issue for the construction industry. Yet, sustainable real estate developments are still considered as highly ambitious projects. To find out how and why sustainable renovation projects actually became sustainable we systematically evaluated 21 leading Dutch real

  9. Decision-making in the Pre-design Stage of Sustainable Building Renovation Projects

    DEFF Research Database (Denmark)

    Gade, Anne Nørkjær; Jensen, Rasmus Lund; Larsen, Tine Steen

    2017-01-01

    There is a great potential in renovating our existing building stock, in terms of improving environmental, economic and social qualities. Meeting the increasing performance requirements for sustainable construction entails an increasing level of complexity in the design process of both new...... buildings and renovation projects. Decision support tools are one solution that can help the building owner manage this complexity. This study investigates the current decision-making processes among Danish professional building owners, in order to propose a conceptual framework for future decision support...... tools for sustainable renovation. Design Science Research Methodology has been used as the main methodological framework. Current practices for setting goals for sustainability, determining the current state of the buildings and prioritizing which buildings to renovate within a building portfolio, have...

  10. An assessment of schoolyard renovation strategies to encourage children's physical activity

    Directory of Open Access Journals (Sweden)

    Greenwood Emily

    2011-04-01

    Full Text Available Abstract Background Children in poor and minority neighborhoods often lack adequate environmental support for healthy physical development and community interventions designed to improve physical activity resources serve as an important approach to addressing obesity. In Denver, the Learning Landscapes (LL program has constructed over 98 culturally-tailored schoolyard play spaces at elementary schools with the goal to encourage utilization of play spaces and physical activity. In spite of enthusiasm about such projects to improve urban environments, little work has evaluated their impact or success in achieving their stated objectives. This study evaluates the impacts of LL construction and recency of renovation on schoolyard utilization and the physical activity rates of children, both during and outside of school, using an observational study design. Methods This study employs a quantitative method for evaluating levels of physical activity of individuals and associated environmental characteristics in play and leisure environments. Schools were selected on the basis of their participation in the LL program, the recency of schoolyard renovation, the size of the school, and the social and demographic characteristics of the school population. Activity in the schoolyards was measured using the System for Observing Play and Leisure Activity (SOPLAY, a validated quantitative method for evaluating levels of physical activity of individuals in play and leisure environments. Trained observers collected measurements before school, during school recess, after school, and on weekends. Overall utilization (the total number of children observed on the grounds and the rate of activity (the percentage of children observed who were physically active were analyzed. Observations were compared using t-tests and the data were stratified by gender for further analysis. In order to assess the impacts of LL renovation, recently-constructed LL schoolyards were

  11. Adoption of innovative energy systems in social housing: Lessons from eight large-scale renovation projects in The Netherlands

    International Nuclear Information System (INIS)

    Hoppe, Thomas

    2012-01-01

    Thanks to new insights on the impacts that dwellings have throughout their life cycles, there has been increased attention to retrofitting innovative energy systems (IES) in existing housing. This paper uses an explorative case study design to gain more knowledge about the governance aspects of this under-researched topic. The central research question is: Which factors influence the adoption of innovative energy systems in social housing sites during renovation projects? To answer this question, eight large-scale renovation projects in The Netherlands were investigated. These case studies allowed the identification of barriers, enabling factors and perspectives from three main actors—housing associations, tenants and local authorities. It turns out that adopting IES encounters many barriers: lack of trust between project partners, delay in project progress, financial feasibility considerations, lack of support from tenants, lengthy legal permit procedures, over-ambitious project goals, poor experiences in previous projects, and IES ambitions that are not taken serious by key decision-makers. Furthermore, IES were only successfully fitted in three of the eight projects. Moreover, ambitions were lowered as the projects progressed in all the cases investigated. The study calls for further systematic, in-depth comparison of fitting IES in large-scale renovation projects in social housing. - Highlights: ► Attention to adoption of innovative energy systems in social housing. ► Several non-technical factors influence adoption. ► In-depth analysis of eight local-level renovation projects. ► Ambitions are lowered as projects progress. ► Barriers: financial feasibility, over-ambitious goals, delay, lack of trust.

  12. A two-factor method for appraising building renovation and energy efficiency improvement projects

    International Nuclear Information System (INIS)

    Martinaitis, Vytautas; Kazakevicius, Eduardas; Vitkauskas, Aloyzas

    2007-01-01

    The renovation of residential buildings usually involves a variety of measures aiming at reducing energy and building maintenance bills, increasing safety and market value, and improving comfort and aesthetics. A significant number of project appraisal methods in current use-such as calculations of payback time, net present value, internal rate of return or cost of conserved energy (CCE)-only quantify energy efficiency gains. These approaches are relatively easy to use, but offer a distorted view of complex modernization projects. On the other hand, various methods using multiple criteria take a much wider perspective but are usually time-consuming, based on sometimes uncertain assumptions and require sophisticated tools. A 'two-factor' appraisal method offers a compromise between these two approaches. The main idea of the method is to separate investments into those related to energy efficiency improvements, and those related to building renovation. Costs and benefits of complex measures, which both influence energy consumption and improve building constructions, are separated by using a building rehabilitation coefficient. The CCE is used for the appraisal of energy efficiency investments, while investments in building renovation are appraised using standard tools for the assessment of investments in maintenance, repair and rehabilitation

  13. Collaboration opportunities in advanced housing renovation

    DEFF Research Database (Denmark)

    Mlecnik, Erwin; Kondratenko, Irena; Cré, Johan

    2012-01-01

    demand for integrated renovations has to be stimulated. A research and networking methodology was developed within the framework of the One Stop Shop project to identify and develop collaboration opportunities for advanced housing renovation in Belgium, Denmark, Finland and Norway. The research...... identified key supply-side needs through interviews and questionnaires, and analysed important elements for the development of a web-based portal that can connect supply and demand. The project further developed ideas and methods for collaboration and business model generation between different players...... on the renovation market. These different research results contributed to defining new business opportunities related to process innovation to unburden the homeowner and to achieve less fragmented renovation processes...

  14. We forgot half of the population! The significance of gender in Danish energy renovation projects

    DEFF Research Database (Denmark)

    Tjørring, Lise

    2016-01-01

    that the way people live their everyday lives plays a crucial role in understanding why they choose whether to perform an energy renovation. This study is based on an anthropological investigation of ten Danish families and their decision-making process while receiving free energy advice, which, in many cases......, ended as an energy renovation project in the home. During the study, gender emerged as a significant factor in two ways. First, energy renovations were perceived differently by men and women as a consequence of their different everyday practices. Second, there was a cultural norm about the division...... that contains different gender practices and cultural influences....

  15. Performance Evaluation and Improvement of a Newly-Renovated Danish School Building (Retro-commissioning)

    DEFF Research Database (Denmark)

    Liu, Li; Georgieva, Viktoriya Vasileva; Zabusova, Diana

    2017-01-01

    In this study, we analyse and evaluate the energy performance of a Danish school building 4 years after its renovation. The structure of the following paper follows four phases, which include Planning, Investigation, Implementation and Hand-off. In the Planning phase, the objectives of the retro...... commissioning are set based on the Owner’s Project Requirements. The Investigation phase aims to analyze how the building and its systems are performing in terms of energy use and indoor environmental quality. The Implementation phase includes dynamic building simulations, which target to analyze different...... solutions and their impact on the energy consumption and indoor environmental quality in the building. Description of the final solution for optimization is included in the conclusion (Hand-off phase) of this paper....

  16. The Renovation and Future Capabilities of the Thacher Observatory

    Science.gov (United States)

    O'Neill, Katie; Osuna, Natalie; Edwards, Nick; Klink, Douglas; Swift, Jonathan; Vyhnal, Chris; Meyer, Kurt

    2016-01-01

    The Thacher School is in the process of renovating the campus observatory with a new meter class telescope and full automation capabilities for the purpose of scientific research and education. New equipment on site has provided a preliminary site characterization including seeing and V-band sky brightness measurements. These data, along with commissioning data from the MINERVA project (which uses comparable hardware) are used to estimate the capabilities of the observatory once renovation is complete. Our V-band limiting magnitude is expected to be better than 21.3 for a one minute integration time, and we estimate that milli-magnitude precision photometry will be possible for a V=14.5 point source over approximately 5 min timescales. The quick response, autonomous operation, and multi-band photometric capabilities of the renovated observatory will make it a powerful follow-up science facility for exoplanets, eclipsing binaries, near-Earth objects, stellar variability, and supernovae.

  17. The Integrated Renovation Process

    DEFF Research Database (Denmark)

    Galiotto, Nicolas; Heiselberg, Per; Knudstrup, Mary-Ann

    2015-01-01

    the project stakeholders to overcome most informational barriers to sustainable home renovation such as lack of knowledge, lack of interest, lack of support, and lack of social and emotional understanding. The homeowners were able to perceive the new and numerous qualities they were getting in their newly......The potential for primary energy savings is greatest in the building sector. A very relevant way to save energy is to increase the rates and depths of building renovations. In order to reach such goals, building owners need to be convinced to invest in high-performance sustainable renovation...

  18. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    Science.gov (United States)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  19. Value based building renovation - A tool for decision-making and evaluation

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Maslesa, Esmir

    2015-01-01

    Research on the barriers for building renovation in Denmark has revealed that an important obstacle is a lack of simple and holistic tools that can assist stakeholders in prioritisation and decision-making during the early stages of building renovation projects. The purpose of this article...... is to present a tool - RENO-EVALUE, which can be used as decision support for sustainable renovation projects, and for evaluation, during and after building renovations. The tool is a result from the European Eracobuild project ACES - "A concept for promotion of sustainable retrofitting and renovation in early...... stages". This article presents the main result of a work package concerning benefits of renovation. RENO-EVALUE has been developed from four case studies on renovation projects in Denmark, tested and validated on the cases and in a Delphi study. The tool is value based by focusing on the different...

  20. Performance Evaluation and Improvement of a Newly-Renovated Danish School Building (Retro-commissioning)

    DEFF Research Database (Denmark)

    Liu, Li; Georgieva, Viktoriya Vasileva; Zabusova, Diana

    2017-01-01

    In this study, we analyse and evaluate the energy performance of a Danish school building 4 years after its renovation. The structure of the following paper follows four phases, which include Planning, Investigation, Implementation and Hand-off. In the Planning phase, the objectives of the retro...

  1. From demonstration projects to volume market : Market development for advanced housing renovation

    NARCIS (Netherlands)

    Mlecnik, E.; Prendergast, E.; Rodsjo, A.; Haavik, T.; Parker, P.

    2010-01-01

    How do we get from demonstration projects to a volume market for very low energy demand in advanced housing renovation? The contributors to this report have been working with this issue for many years. Some worked in both IEA SHC Task 28 Sustainable Housing (2000-2005) and in SHC Task 37 Advanced

  2. Optimal Decision Model for Sustainable Hospital Building Renovation-A Case Study of a Vacant School Building Converting into a Community Public Hospital.

    Science.gov (United States)

    Juan, Yi-Kai; Cheng, Yu-Ching; Perng, Yeng-Horng; Castro-Lacouture, Daniel

    2016-06-24

    Much attention has been paid to hospitals environments since modern pandemics have emerged. The building sector is considered to be the largest world energy consumer, so many global organizations are attempting to create a sustainable environment in building construction by reducing energy consumption. Therefore, maintaining high standards of hygiene while reducing energy consumption has become a major task for hospitals. This study develops a decision model based on genetic algorithms and A* graph search algorithms to evaluate existing hospital environmental conditions and to recommend an optimal scheme of sustainable renovation strategies, considering trade-offs among minimal renovation cost, maximum quality improvement, and low environmental impact. Reusing vacant buildings is a global and sustainable trend. In Taiwan, for example, more and more school space will be unoccupied due to a rapidly declining birth rate. Integrating medical care with local community elder-care efforts becomes important because of the aging population. This research introduces a model that converts a simulated vacant school building into a community public hospital renovation project in order to validate the solutions made by hospital managers and suggested by the system. The result reveals that the system performs well and its solutions are more successful than the actions undertaken by decision-makers. This system can improve traditional hospital building condition assessment while making it more effective and efficient.

  3. IEA SHC Task 37: advanced housing renovation - Final report; IEA SHC Task 37: advanced housing renovation - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Hastings, R.

    2010-01-15

    This final report for the Swiss Federal Office of Energy (SFOE) reports on work done within the framework of the International Energy Agency's Solar Heating and Cooling program. The project addressed the energy consumption of residential buildings and their renovation. The report discusses the goals set for the project and reports on five projects that were initiated. These include the refurbishment of apartment buildings to meet the 'Passive House' standard, air-tightness, potential for the use of solar energy, solar facades and the renovation of historic listed buildings. Conclusions resulting from these projects are presented and discussed.

  4. Holistic Energy Renovation of Pre- and Postwar Apartment Blocks in Denmark

    DEFF Research Database (Denmark)

    Eriksen, Marlene Stenberg Hagen; Rode, Carsten; Bjarløv, Søren Peter

    of today. This paper presents the Danish research project Holistic Energy Renovation, which aims at performing a holistic energy renovation of two case buildings. As part of the project nine parameters for a holistic renovation have been defined, a method for developing and assessing a holistic building...... of the assessment method and an evaluation of how the holistic perspective has influenced the project process and product development....

  5. Renovate Right: Prevent Lead Poisoning in Children

    Centers for Disease Control (CDC) Podcasts

    In this podcast, Dr. Maria Doa, Director of the Environmental Protection Agency's (EPA) National Program Chemicals Division, discusses EPA's new rule for renovations, repairs, and painting activities. The new rule includes information on lead-safe work practices when conducting renovations, repairs, and painting in pre-1978 homes and schools to prevent the spread of lead dust.

  6. Energy renovation solutions - catalogue; Energirenoveringstiltag - katalog

    Energy Technology Data Exchange (ETDEWEB)

    Tommerup, H.

    2010-07-15

    The project's aim has been to develop methods and examples of extensive energy renovations to stimulate energy conservation and increased use of renewable energy in existing buildings. The current report represents an extensive technology catalogue of typical energy renovation measures in connection with the renovation of existing buildings. For every action the main aspects are explained concerning such issues as technology, use, barriers, indoor climate, energy conservation and prices. The report is mainly targeted at construction industry, but also many other stakeholders can benefit from the report. (ln)

  7. Energy Renovation of Danish Single-Family Houses

    DEFF Research Database (Denmark)

    Mortensen, Andrea

    2015-01-01

    . The results show that despite the barriers the owners can in fact be motivated to perform private energy renovations. A sound project economy is all-important for this to happen and it should if possible be supported by improvements in both comfort, indoor environment and architecture to increase......The PhD project is based on requirements from the European Union to reduce the energy consumption and on current renovation needs of and a huge energy saving potential in the Danish single-family houses from the 1960’s and 1970’s. The project focuses on the barriers for energy renovations...... of these houses and on defining motivation factors for the homeowners. The barriers are many and variating in influence and studies show that both professionals and homeowners are affected. The barriers range from lack of interest and knowledge to uncertainties about among others economy and technical solutions...

  8. Inspiration and experiences from the joint analysis of shining examples of comprehensive energy renovation building projects within IEA EBC Annex 56

    DEFF Research Database (Denmark)

    Christen Mørck, Ove; Almeida, Manuela; Ferreira, Marco

    2016-01-01

    The International Energy Agency established in 2011 an Implementing Agreement within the Energy in Buildings and Communities Program to undertake research and provide an international focus on Cost Effective Energy and Carbon Emissions Optimization in Building Renovation (EBC Annex 56). The project...... aimed at developing a new methodology to enable cost effective renovation of existing buildings while optimizing energy consumption and carbon emissions reduction. Gathering of case studies was one of the activities undertaken to reach the overall project objectives. Among the case studies, a selection...

  9. Existing sustainable renovation concepts for single-family houses

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Vanhoutteghem, Lies; Svendsen, Svend

    2010-01-01

    In the Nordic Innovation Centre Project, SuccessFamilies, the main objective is to change the business environment in order to speed up the implementation of sustainable renovation of single-family houses – proposing new service concepts that will combine both the technical solutions, financing...... with individual solutions, traditional warehouses ”do-it-yourself-shops” and some actors marketing single products. To speed up the implementation of sustainable renovation of single-family houses there is a great need for full-service packages. Existing technical renovation concepts, typically focusing...... services as well as other promoting issues to overcome the behavioural, organizational, legal and social barriers that exist in sustainable renovation. A starting point for such a change has been to get an overview of the existing sustainable renovation concepts, i.e. full-service concepts and technical...

  10. Renovate Right: Prevent Lead Poisoning in Children

    Centers for Disease Control (CDC) Podcasts

    2008-10-02

    In this podcast, Dr. Maria Doa, Director of the Environmental Protection Agency's (EPA) National Program Chemicals Division, discusses EPA's new rule for renovations, repairs, and painting activities. The new rule includes information on lead-safe work practices when conducting renovations, repairs, and painting in pre-1978 homes and schools to prevent the spread of lead dust.  Created: 10/2/2008 by National Center for Environmental Health (NCEH).   Date Released: 10/2/2008.

  11. Sustainability Evaluation of Retrofitting and Renovation of Buildings in Early Stages

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Maslesa, Esmir; Gohardani, Navid

    2013-01-01

    research results and ideas for the development of a tool, which can be used as decision support for renovation projects in early stages. The research is part of the Eracobuild project ACES – “A concept for promotion of sustainable retrofitting and renovation in early stages” with participants from Denmark...

  12. Final report of the pre - investigation phase. Project on the establishment and renovation of renewable energy production facilities in Northern Poland

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    The project for the erection of a windmill park and the renovation/modernisation of the hydro power plants reached with the finishing of the pre-investigation a milestone. The results of the investigations show that the project is fully corresponding with both EU and polish politic aims of increased utilisation of renewable energy sources for electricity production. Further the pre-investigation notified, that in Poland there exists a lack of experience of the utilisation of wind for electricity production, as there exists only 12 windmill/windmill parks, so that the project is evaluated to have a high demonstration effect on the production of renewable energy based on wind. During the pre-investigation there were elaborated among others feasibility studies on the erection of the windmill park and the renovation of the hydro power plants. The economic feasibility calculations on both parts of the project, found that erection of the windmill park and the renovation of the hydro power plants are fully feasible under the existing conditions. It is foreseen that KEW, the local electricity production company as investor will obtain a loan under the Danish environmental soft loan program for Eastern Europe for the equipment and installation of the equipment. Associated specialist work is applied for support by the Danish Environmental Agency and the Danish Energy Agency. That these institutions and the Danish State Export Credit Agency (EKF) approve their principal willingness to support this project is the next necessary step for the projects implementation. (au)

  13. Renovating animal facilities to withstand disasters.

    Science.gov (United States)

    Cartwright, Jim; Contratto, Jim; Gould, Nathan; Freeman, William

    2013-10-01

    In the aftermath of Superstorm Sandy, new attention has been drawn to planning for and mitigating the effects of disasters on laboratory animal facilities. A number of design approaches and solutions can be easily incorporated into a new vivarium, enhancing its ability to withstand and recover from a disaster. Renovating a vivarium poses special challenges, however. Existing conditions in the project area may dictate which approaches or solutions are feasible, and retrofitting is often more complex and expensive than incorporating the same features into new construction. The authors explain how project design teams can evaluate the types of disasters that a renovated facility will need to address and develop a design strategy that responds to these disasters in the most effective way.

  14. Renovation and uprating of seven hydropower plants in Java

    International Nuclear Information System (INIS)

    Nuessli, W.

    1991-01-01

    The Indonesian Power Authority is planning to renovate and uprate seven hydropower stations in Java to expand plant life expectancy, ensure operating safety and reliability, and increase power and generation within economical limits. The power plants were constructed in the early 1920s and extended between 1945 and 1950. Their capacities vary between 4 and 20 MW. For the renovation project, Colenco Power Consulting Ltd. is acting as a consultant to PLN. In February 1990, Colenco inspected all seven power plants. The results of the inspections served as the basis for the development of renovation plans for each of the seven hydropower plants. To determine the cost of the proposed renovation plans, appraisers had to determine a method for comparing the value of an existing plant to that of a renovated one. The two different evaluation methods used for these comparisons are the focus of this paper

  15. Energy Efficient Renovation of Social Housing

    DEFF Research Database (Denmark)

    Bech-Nielsen, Grith; Christiansen, Michael

    In years to come the social housing sector (SH) must undergo renovation. The SH is out of step with modern requirements when it comes to plan arrangements, energy frame calcu-lation, flexible building services and social challenges. A way to solve such challenges in an environmentally, economically......, such as residents, housing administration, politicians, advi-sors, producers and contractors. Secondly we present follow up methods for developing an overall future energy renova-tion SH strategy. Our project contributes to the building sector by suggesting new methods for meeting challenges concerning energy......), (2) workshops and (3) seminars for qualifying (4) the definition of a common framework for (5) the development and (6) acceptance of the actual energy renovation strategy, which will then be transformed into action plans in the form of (7) ”common screening” of housing and housing areas as a basis...

  16. A hybrid decision support system for sustainable office building renovation and energy performance improvement

    Energy Technology Data Exchange (ETDEWEB)

    Juan, Yi-Kai [Department of Architecture, National Taiwan University of Science and Technology (NTUST) (China); Center for Sustainable Development and Global Competitiveness, Stanford University (United States); Gao, Peng [Department of Traffic and Transportation Engineering, Tongji University (China); Wang, Jie [Center for Sustainable Development and Global Competitiveness, Stanford University (United States)

    2010-03-15

    Energy consumption of buildings accounts for around 20-40% of all energy consumed in advanced countries. Over the last decade, more and more global organizations are investing significant resources to create sustainably built environments, emphasizing sustainable building renovation processes to reduce energy consumption and carbon dioxide emissions. This study develops an integrated decision support system to assess existing office building conditions and to recommend an optimal set of sustainable renovation actions, considering trade-offs between renovation cost, improved building quality, and environmental impacts. A hybrid approach that combines A* graph search algorithm with genetic algorithms (GA) is used to analyze all possible renovation actions and their trade-offs to develop the optimal solution. A two-stage system validation is performed to demonstrate the practical application of the hybrid approach: zero-one goal programming (ZOGP) and genetic algorithms are adopted to validate the effectiveness of the algorithm. A real-world renovation project is introduced to validate differences in energy performance projected for the renovation solution suggested by the system. The results reveal that the proposed hybrid system is more computationally effective than either ZOGP or GA alone. The system's suggested renovation actions would provide substantial energy performance improvements to the real project if implemented. (author)

  17. Using a One-Stop-Shop Concept to Guide Decisions when Single-Family Houses are renovated

    DEFF Research Database (Denmark)

    Grøn Bjørneboe, Matilde; Svendsen, Svend; Heller, Alfred

    2017-01-01

    of renovation. The scope of the project was to carry out renovations on up to three houses. The project revealed that the concept on its own was not enough to motivate the house owners to engage in extensive renovation. However, interviews with the house owners indicated that the renovations that took place had...... was to determine how a one-stop-shop (OSS) or full-service concept could be used to guide the extensive energy renovation of single-family houses. The purpose was partly to identify the benefits and disadvantages of using the concept and partly to evaluate the potential of the OSS concept for increasing the degree...... probably been expanded and improved with the use of the concept and that the renovations in general benefitted from an independent adviser....

  18. Renovation versus New Construction and Building Decision Tool for Educational Facilities

    OpenAIRE

    Pope, Carrie; Marks, Eric; Back, Edward; Leopard, Tim; Love, Thomas

    2016-01-01

    Renovation of an existing building is an accomplished stem of the construction industry because it supplies financial diversification for construction stakeholders. Although several construction planning tools and stakeholder alignment exercises have been developed, no tool exists to assist project owners to decide between renovating an existing building and new construction with a comprehensive decision criteria. The objective of this research is to create and test a renovation versus new bu...

  19. Life Cycle Thinking and Integrated Product Deliveries in renovation projects: Extending the concept of Integrated Product Deliveries with Product Service Systems

    DEFF Research Database (Denmark)

    Schipull Kauschen, Jan

    2012-01-01

    extension to the concept of IPDs discussed. Due to extended product responsibility, the concept of PSSs will offer new possibilities of planning and pre-defining life cycles of IPDs more precisely than for regular building components. Reducing or eliminating point-of-sales will induce producers to optimize...... on renovation projects from Denmark, using different forms of IPDs for façade renovation and discusses the different stakeholder’s perspectives on life cycle thinking and their interests and values regarding sustainable building. Furthermore is the concept of Product Service Systems (PSS) as a valuable...

  20. Tenants’ experiences and satisfaction with renovated and energy retrofitted social housing

    DEFF Research Database (Denmark)

    Knudsen, Henrik Nellemose; Jensen, Ole Michael

    studied and verified. The objective of the present project was to evaluate tenants’ experiences and satisfaction with renovated and energy retrofitted social housing. A questionnaire was developed that included questions about perceived indoor climate, possible co-benefits, the renovation process, various....... The evaluations show that it is possible to implement a comprehensive renovation with focus on energy savings in older building stock and at the same time add value for tenants in the form of i.a. improved perceived indoor climate....

  1. Building Energy-Efficient Schools in New Orleans: Lessons Learned (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2011-12-01

    This case study presents the lessons learned from incorporating energy efficiency in the rebuilding and renovating of New Orleans K-12 schools after Hurricanes Katrina and Rita. Hurricane Katrina was the largest natural disaster in the United States, striking the Gulf Coast on August 29, 2005, and flooding 80% of New Orleans; to make matters worse, the city was flooded again only three weeks later by the effects of Hurricane Rita. Many of the buildings, including schools, were heavily damaged. The devastation of schools in New Orleans from the hurricanes was exacerbated by many years of deferred school maintenance. This case study presents the lessons learned from incorporating energy efficiency in the rebuilding and renovating of New Orleans K-12 schools after Hurricanes Katrina and Rita. The experiences of four new schools-Langston Hughes Elementary School, Andrew H. Wilson Elementary School (which was 50% new construction and 50% major renovation), L.B. Landry High School, and Lake Area High School-and one major renovation, Joseph A. Craig Elementary School-are described to help other school districts and design teams with their in-progress and future school building projects in hot-humid climates. Before Hurricane Katrina, New Orleans had 128 public schools. As part of the recovery planning, New Orleans Public Schools underwent an assessment and planning process to determine how many schools were needed and in what locations. Following a series of public town hall meetings and a district-wide comprehensive facility assessment, a Master Plan was developed, which outlined the renovation or construction of 85 schools throughout the city, which are expected to be completed by 2017. New Orleans Public Schools expects to build or renovate approximately eight schools each year over a 10-year period to achieve 21st century schools district-wide. Reconstruction costs are estimated at nearly $2 billion.

  2. Fabulous Facilities: New Constructions and Renovations.

    Science.gov (United States)

    American Libraries, 1997

    1997-01-01

    Renovation and construction projects in 18 public and academic libraries across the United States are showcased, with 23 photographs illustrating library interiors and exteriors. Discussion centers on architecture, costs, technology infrastructure and equipment, preservation of old facilities, furniture, and library functions. (AEF)

  3. The Integrated Renovation Process

    DEFF Research Database (Denmark)

    Galiotto, Nicolas; Heiselberg, Per; Knudstrup, Mary-Ann

    The Integrated Renovation Process (IRP) is a user customized methodology based on judiciously selected constructivist and interactive multi-criteria decision making methods (Galiotto, Heiselberg, & Knudstrup, 2014 (expected)). When applied for home renovation, the Integrated Renovation Process...

  4. Energy savings from housing: Ineffective renovation subsidies vs efficient demolition and reconstruction incentives

    International Nuclear Information System (INIS)

    Dubois, Maarten; Allacker, Karen

    2015-01-01

    Energy savings in the housing sector are key to reduce global greenhouse gas emissions. Policies to incentivize energy savings are however disparate between countries. Taking into account environmental aspects and consumer surplus, the paper uses a stylized economic model to assess the effectiveness and efficiency of three economic instruments: subsidies for renovation, subsidies for demolition and reconstruction projects and subsidies for building new houses on virgin land. The assessment also relates to differentiated value added taxes and other financial incentives such as green loans. In a counter-intuitive way, the model highlights that subsidies for renovations with minor energy gains worsen the overall energy consumption of housing due to the inducement of lock-ins with energy inefficient houses. Structural changes are needed in the use of policy instruments. First, commonly applied support schemes for renovations with minor energy savings should be abolished. Second, scarce public resources should incentivize deep renovation and demolition and reconstruction. Finally, taxes should apply on the use of virgin land to persuade households with a high willingness to pay for a new house, to invest in demolition and reconstruction. - Highlights: • Renovation subsidies worsen overall energy consumption of housing. • Renovation induces a lock-in with energy inefficient houses. • Renovation subsidies should be abolished or structurally reformed. • Policy should incentivize demolition and reconstruction projects. • Building on virgin land should be taxed.

  5. Contracting and building renovation - does it work together?

    Energy Technology Data Exchange (ETDEWEB)

    Tritthart, Wibke; Bruner-Lienhart, Susanne [Inter-Univ. Research Centre for Technology, Work and Culture, Graz (Austria); Bleyl, Jan W.; Bucar, Gerhard [Graz Energy Agency (Austria)

    2007-07-01

    The renovation or refurbishment is an important point in the life cycle of a building that makes it possible to achieve both environmental and climate protection goals and a higher quality of living of the inhabitants. However, lack of money often leads to a renovation that covers only the basic requirements, whereas measures that are valuable in a long term perspective like energy saving measures are not realised. Energy performance contracting (EPC) is widely used as an instrument to reduce long term operating costs significantly by guaranteed energy savings. An energy service company (ESCo) implements saving technologies, especially in the field of heating, HVAC, lighting and plug loads, and in particular in public buildings. It is the aim of this paper to investigate the possibilities to incorporate construction measures like building envelope insulation into standard energy performance contracting.For this purpose a qualitative survey is presented that was performed among experts and stakeholders in the business: ESCos, building owners and facility managers, representatives of construction companies and financing institutions were interviewed. The focus was on their experiences with such projects, on difficulties that arose or barriers that exist from their point of view and on the chances they perceived. This provides the basis for identifying restraints and supporting factors for the integration of contracting and constructional measures.Three pilot projects that have been renovated in Austria are outlined subsequently. They are evaluated with respect to the contractual network between the project partners, types of guarantees and financing issues. Special emphasis is put on the assignment of tasks and the cash flow between the project partners. Various constellations of trades acted as energy service provider: a general contractor, an energy supply company, a consortium of a builder and a plumber. The projects reveal some differences to the standard energy

  6. Existing Sustainable Renovation Concepts

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Vanhoutteghem, Lies; Gustavsson, Leif

    The Nordic single-family house renovation market is dominated by a craftsman based approach with individual solutions, traditional warehouses ”do-it-yourself-shops” and some actors marketing single products. To speed up the implementation of sustainable renovation of single-family houses there is......The Nordic single-family house renovation market is dominated by a craftsman based approach with individual solutions, traditional warehouses ”do-it-yourself-shops” and some actors marketing single products. To speed up the implementation of sustainable renovation of single-family houses...

  7. Screening of Energy Renovation Measures for Schools – Denmark

    DEFF Research Database (Denmark)

    Mørck, Ove; Paulsen, Anton; Stiger, Simone

    2013-01-01

    School of the Future’ is a collaborative project within the 7th Framework Programme of the European Union in the energy sector. It started in February 2011 and will run for 5 years. The aim of the “School of the Future” project is to design, demonstrate, evaluate and communicate shining examples...... of how to reach the future high performance building level. School buildings and their primary users: pupils – the next generations – are in the focus of the project. Both, the energy and indoor environment performance of 4 demo buildings in 4 European countries and climates will be greatly improved due...

  8. How to Successfully Renovate a Controls System? - Lessons Learned from the Renovation of the CERN Injectors’ Controls Software

    CERN Document Server

    Kruk, G; Kulikova, O; Lezhebokov, V; Pace, M; Pera Mira, P; Roux, E; Wozniak, J Pawel

    2014-01-01

    Renovation of the control system of the CERN LHC injectors was initiated in 2007 in the scope of the Injector Controls Architecture (InCA) project. One of its main objectives was to homogenize the controls software across CERN accelerators and reuse as much as possible the existing modern sub-systems, such as the settings management used for the LHC. The project team created a platform that would permit coexistence and intercommunication between old and new components via a dedicated gateway, allowing a progressive replacement of the former. Dealing with a heterogeneous environment, with many diverse and interconnected modules, implemented using different technologies and programming languages, the team had to introduce all the modifications in the smoothest possible way, without causing machine downtime. After a brief description of the system architecture, the paper discusses the technical and non-technical sides of the renovation process such as validation and deployment methodology, operational applicatio...

  9. Potential energy savings in renovation projects of residential and service buildings; Energiansaeaestoemahdollisuudet rakennuskannan korjaustoiminnassa

    Energy Technology Data Exchange (ETDEWEB)

    Heljo, J.; Vihola, J.

    2012-11-01

    The study estimates the feasible energy savings potential in the 2010 building stock by 2050. The focus is on energy-saving measures related to renovation of residential and service buildings. The calculations were done by building types and age groups using the EKOREM calculation model. The calculations indicate the building types and structural elements where potential for savings exists. The study did not consider energy-saving measures related to changes in heating systems, electrical equipment, property maintenance or use habits. The study disproved the common belief that considerably more energy savings could be achieved faster by focussing on the existing building stock instead of new construction. That is mainly due the fact that it generally pays to implement structural energy-saving measures only when the targeted elements also require other significant repairs besides energy-efficiency improvements. Thus, energy renovations cannot be speeded up very much. The clearest exception are the extra insulations added to roof assemblies that are easy to implement. Attempts to save more energy in the building stock than can be achieved at a small additional cost in connection with needed renovations may multiply costs, and the saving in energy costs will not necessarily cover the additional investments. The efficiency of energy-saving measures can be affected by recommending or ordering use of more energy efficient windows, thicker extra insulations or more efficient ventilation heat recovery systems than the standard solution selected in connection with renovations. The goal of preserving the characteristics of buildings of cultural-historical or architectural value and the typical solutions and materials used in all buildings of a certain period limit the repair and renovation of structural elements. In the case of these buildings, improvement of energy efficiency can be considered in connection with the planning of renovations and the buildings' use and

  10. Chances and barriers for passive house renovations

    NARCIS (Netherlands)

    Mlecnik, E.; Opstelten, I.; Rovers, R.; Verdeyen, N.; Wagenaar, A.

    2016-01-01

    There is significant potential for carbon reduction and energy saving in residential buildings. Various market actors are looking for ways to increase the uptake of passive house renovation and its certification.
    This study aimed specifically to draw lessons from research projects towards the

  11. Performance Evaluation of Public-Private Partnership Projects from the Perspective of Efficiency, Economic, Effectiveness, and Equity: A Study of Residential Renovation Projects in China

    Directory of Open Access Journals (Sweden)

    Xuhui Cong

    2018-06-01

    Full Text Available The performance evaluation index system was established on the basis of 4E (Efficiency, Economic, Effectiveness, Equity theory to improve performance evaluation of Public-Private Partnership Projects for Residential Renovation (4P2R. Moreover, the index weighting model was demonstrated based on Ordered Weighted Averaging (OWA. Finally, the cloud model was used for performance evaluation, through the cloud uncertainty reasoning to determine the quantitative performance evaluation index value, the positive reverse cloud to calculate the qualitative performance evaluation index value, and the normal cloud to measure the project performance. The proof-of-concept application shows that the performance evaluation index system and evaluation model can better identify the deficiencies in the project, and provide targeted improvement measures for similar projects in the future.

  12. The University of Michigan, Kellogg Building Expansion & Renovation, Ann Arbor, Michigan.

    Science.gov (United States)

    Design Cost Data, 2001

    2001-01-01

    Presents design, construction, and cost data for the University of Michigan's Kellogg Building expansion and renovation project. A list of project manufacturers and suppliers is provided along with four photographs and four floor plans. (GR)

  13. Perspectives on Near ZEB Renovation Projects for Residential Buildings: The Spanish Case

    Directory of Open Access Journals (Sweden)

    Faustino Patiño-Cambeiro

    2016-08-01

    Full Text Available EU regulations are gradually moving towards policies that reduce energy consumption and its environmental impact. To reach this goal, improving energy efficiency in residential buildings is a key action line. The European Parliament adopted the Near Zero-Energy Building (nZEB as the energy efficiency paradigm through Directive 2010/31/EU, but a common technical and legislative framework for energy renovations is yet to be established. In this paper, the nZEB definition by COHERENO was adopted to evaluate several energy renovation packages in a given building, which is also representative of the Spanish building stock. Global costs are calculated for all of them following EPBD prescriptions. Two economic scenarios are analysed: with entirely private funding and with the current public financial incentives, respectively. The results show the divergence between optimum solutions in terms of costs and of minimum CO2 footprint and maximum energy saving. Moreover, in the absence of enough incentives, some inefficient renovations could achieve a global cost close to the optimal cost. The optimum solution both in terms of energy performance and global costs was carried out and described.

  14. Successful sustainable renovation; Succesvolle duurzame renovatie

    Energy Technology Data Exchange (ETDEWEB)

    Van Doorn, A.Q.C.M.; De Ruyter, G.M. [Yacht, Randstad, Diemen (Netherlands); Kaper, A.A. [Ballast Nedam, Nieuwegein (Netherlands)

    2011-04-15

    Building Brains has been set up by TNO as a cooperative and started September 21, 2009. The aim of the project was to answer the question how the energy consumption in the Netherlands can be reduced by 50% up to 2030 or how the built environment can be made energy-neutral. This issue of the magazine is dedicated to Building Brains project. It is often said that Smart defined ambitions and strict process management are important ingredients for successful realization of building projects. Sustainable real estate developments can be considered as highly ambitious projects. To find out how and why sustainable renovation projects actually became sustainable, a group of professionals systematically evaluated 21 leading Dutch real estate renovation projects. For each project they interviewed the client, consultant, architect and contractor. Based on the results it was concluded that a pre-defined (sustainability) ambition is not a necessity to realize a project that can be considered sustainable in practice. [Dutch] Building Brains is een door TNO opgezet samenwerkingsproject dat op 21 september 2009 van start ging. Het doel van het project is antwoord te geven op de vraag hoe tot 2030 het energiegebruik in Nederland kan worden gehalveerd of hoe de gebouwde omgeving energieneutraal kan worden gemaakt. Deze aflevering van het tijdschrift TVVL is vrijwel geheel gewijd aan het Building Brains project. Een jaar lang zijn de succes- en faalfactoren van duurzame renovatieprojecten onderzocht. Voor 21 projecten zijn in totaal 73 actoren geinterviewd. Er werd een vragenlijst gebruikt, die vanuit vijf invalshoeken was opgesteld: ambitiestelling, duurzame maatregelen, actoren, beleidsomgeving en proces. Per project zijn opdrachtgevers, architecten, aannemers, adviseurs en gebruikers geinterviewd. Alle data is verwerkt in een database. De projecten voldoen aan het selectiecriterium Trias Energetica. Het accent lag op woningbouw, waar de grootste uitdaging ligt voor duurzame

  15. Opportunities and Barriers related to Supply Chain Collaboration for Delivering Integrated Single-Family Home Renovations

    NARCIS (Netherlands)

    Mlecnik, E.; Kondratenko, I.; Haavik, T.

    2013-01-01

    Single-family home renovations often show deficiencies in project management. There might be a market addressing house owners who would prefer integrated renovation services and clear responsibilities. Companies that would respond to these client’s needs would have a clear market potential,

  16. Full-service concept for energy efficient renovation of single-family houses

    DEFF Research Database (Denmark)

    Vanhoutteghem, Lies; Tommerup, Henrik M.; Svendsen, Svend

    2011-01-01

    the solutions. Such one-stop-shops in the form of full-service providers of energy efficient renovation of single-family house are missing in the Nordic countries, although this service is vital to open up the market. As part of the Nordic research project `SuccesFamilies´ with the purpose to change...... houses. A one-stop-shop in the form of a full-service concept could be seen as a possibility to make it easy for the homeowner to comply with possible future requirements to realize far-reaching energy savings in connection with extensive renovations, provided that the building sector offers...... includes an ideal full-service concept and technical renovation solutions targeted to different types of single-family houses....

  17. Leveraging Limited Scope for Maximum Benefit in Occupied Renovation of Uninsulated Cold Climate Multifamily Housing

    Energy Technology Data Exchange (ETDEWEB)

    Neuhauser, K. [Building Science Corporation (BSC), Somer, MA (United States); Bergey, D. [Building Science Corporation (BSC), Somer, MA (United States); Osser, R. [Building Science Corporation (BSC), Somer, MA (United States)

    2012-03-01

    This project examines a large-scale renovation project within a 500 unit, 1960's era subsidized urban housing community. This research focuses on the airflow control and window replacement measures implemented as part of the renovations to the low-rise apartment buildings. The window replacement reduced the nominal conductive loss of the apartment enclosure by approximately 15%; air sealing measures reduced measured air leakage by approximately 40% on average.

  18. School Facilities and Tax Credit Bonds

    Science.gov (United States)

    Edelstein, Frederick S.

    2009-01-01

    The tax credit portion of the American Recovery and Reinvestment Act of 2009 (also known as the economic stimulus package or ARRA) has three different entities that can be used for various school construction including new, modernization, renovation and acquisition of sites for school projects. The bond rule notice and allocations have been issued…

  19. Renovation of social housing

    DEFF Research Database (Denmark)

    Jensen, Stina Rask; Hvejsel, Marie Frier; Kirkegaard, Poul Henning

    consumption in the building sector. This planned transformation towards a more energy-efficient building mass involves changes in the building envelope and, as such, is likely to influence the experience of the built environment dramatically, both interior and exterior. Recent research shows, however...... in the renovation of social housing. Methodologically, this hypothesis is investigated by re-reading the task of energy renovation through the lens of tectonic architectural theory. Specifically, Eduard Sekler’s etymological distinction between structure, construction, and tectonics is developed as a framework...... for addressing the spatial implications and potentials of technical initiatives in contemporary energy renovations within the continuum described by Scott. The framework is applied in two case studies of recent energy renovations of social housing dwellings. Finally, the paper discusses whether the technical...

  20. Renovation works at Restaurant 1

    CERN Document Server

    2006-01-01

    Due to the age of the present kitchen and freeflow installations in Restaurant 1, essential renovations are due to be carried out. The planned period for this project is September 2006 to May 2007. Work on the self-service area of the restaurant will commence in November. Every effort will be made to minimise the inconvenience caused to users of the restaurant and we thank you in advance for your co-operation during this period.

  1. The Integrated Renovation Process

    DEFF Research Database (Denmark)

    Galiotto, Nicolas; Heiselberg, Per; Knudstrup, Mary-Ann

    they get more time for the cost optimization and the qualitative analysis of the users’ needs and behaviours. In order to reach a fossil free energy building stock within an acceptable time frame, it is primordial that researchers, politicians and the building industry work hand in hand. Indeed, in order...... to overcome the financial barriers to energy renovation and bring a new type of building experts in the building renovation sector, cost optimization tools for building renovation have been and can be developed but new legislation and politico-economic supports are still much needed. We present in this report...... a new contribution from the research and industry sides and results reached with the newly developed methodology, but without a significant contribution from the politico-economic and legislation sides . The experiences met during application of the Integrated Renovation Process are described...

  2. Life Cycle Thinking and Integrated Product Deliveries in renovation projects: Extending the concept of Integrated Product Deliveries with Product Service Systems

    DEFF Research Database (Denmark)

    Schipull Kauschen, Jan

    2012-01-01

    on renovation projects from Denmark, using different forms of IPDs for façade renovation and discusses the different stakeholder’s perspectives on life cycle thinking and their interests and values regarding sustainable building. Furthermore is the concept of Product Service Systems (PSS) as a valuable...... IPDs with regard to longevity and adaptability. CONCLUSION The new type of service-focused IPD and the related life-cycle responsibility (development, building phase, maintenance and dismantling/adaption/recycling) creates incentive to integrate life cycle thinking into the development process of IPDs......, resulting in more sustainable building solutions with a greater extend of positive environmental, economical and social impacts. The research presented will also show the importance of adaption and configuration of these complex building components by architects and planners, as they will have a great...

  3. Support for School Construction: Blending Sales Tax with Property Tax.

    Science.gov (United States)

    Haney, David W.; Schmidt, Mark

    2002-01-01

    Describes how opinion by North Dakota's attorney general allows school district and city of Jamestown to collaborate in the issuance of bonds for school construction and renovation projects, three-quarters of the revenue for which is raised by a voter-approved city sales tax. (PKP)

  4. Evaluation of airborne particulates and fungi during hospital renovation.

    Science.gov (United States)

    Overberger, P A; Wadowsky, R M; Schaper, M M

    1995-07-01

    This study was conducted over 30 weeks on a hospital floor undergoing partial renovation. Some patients housed on the floor were immunosuppressed, including bone marrow transplant recipients. The construction zone was placed under negative pressure and was separated from patient rooms by existing hospital walls and via erection of a temporary barrier. Other control measures minimized patient exposure to airborne materials. Air sampling was done for 3 weeks prior to construction, 24 weeks during construction, and 3 weeks after renovation was completed. Airborne particulate concentrations, total spore counts, particle size, and fungal species were assessed. At the beginning of the renovation there were increases in airborne particulates (from 0.2 to 2.0 mg/m3) and fungal spores (from 3.5 to 350 colony forming units (CFU/m3), but only in the construction zone. Throughout the remainder of the renovation, particulate and fungal spore levels fluctuated inside the construction zone but remained close to baseline values in the patient area. When renovation was completed, particulates and spore counts inside the construction zone decreased to preconstruction levels. The primary fungus isolated from air samples was Penicillium. This study demonstrated that control measures were effective in reducing exposures of hospitalized patients to airborne particulates and spores and in reducing the increased risk of aspergillosis and other fungal infections associated with hospital construction projects. The data from this study may be useful in establishing exposure guidelines for other health care settings.

  5. 75 FR 6383 - Lead-Based Paint Renovation, Repair and Painting, and Pre-Renovation Education Activities in...

    Science.gov (United States)

    2010-02-09

    ..., Repair and Painting, and Pre- Renovation Education Activities in Target Housing and Child Occupied....C. 2682(c)(3), and a lead-based paint pre-renovation education program in accordance with section... TSCA, and a lead-based paint pre-renovation education program in accordance with section 406(b) of TSCA...

  6. 76 FR 27044 - Lead-Based Paint Renovation, Repair and Painting, and Pre-Renovation Education Activities in...

    Science.gov (United States)

    2011-05-10

    ..., Repair and Painting, and Pre- Renovation Education Activities in Target Housing and Child Occupied...), and a lead-based paint pre-renovation education program in accordance with section 406(b) of TSCA, 15... renovation and remodeling activities of pre-1978 housing and child-occupied facilities in the State of...

  7. Zero energy office building renovation; Energieneutrale kantoorrenovatie

    Energy Technology Data Exchange (ETDEWEB)

    Deguelle, D.; Krijnen, M. [DHV, Amersfoort (Netherlands); Heijnis, J. [cepezed, Delft (Netherlands)

    2011-04-15

    Building Brains has been set up by TNO as a cooperative and started September 21, 2009. The aim of the project was to answer the question how the energy consumption in the Netherlands can be reduced by 50% up to 2030 or how the built environment can be made energy-neutral. This issue of the magazine is dedicated to Building Brains project. Four different renovation concepts are compared: energy-neutral renovation that involves the exclusive use of sustainable generated energy;.the application of the passive construction principles; the use of Double Skin Facades; and decentralized facade-integrated installation techniques. Following the results of this study two optimized refurbishment approaches for a zero energy office are designed. [Dutch] Building Brains is een door TNO opgezet samenwerkingsproject dat op 21 september 2009 van start ging. Het doel van het project is antwoord te geven op de vraag hoe tot 2030 het energiegebruik in Nederland kan worden gehalveerd of hoe de gebouwde omgeving energieneutraal kan worden gemaakt. Deze aflevering van het tijdschrift TVVL is vrijwel geheel gewijd aan het Building Brains project. Er is onderzocht hoe verschillende renovatieconcepten scoren. Er zijn vier renovatieconcepten met elkaar vergeleken: energie neutraal renoveren door middel van duurzame energieopwekking, toepassen van het passiefhuisprincipe, toepassen van een tweedehuidfacade en toepassen van een decentrale, gevel-geintegreerde installatie. Uit de studie kwamen twee geoptimaliseerde concepten voor een energieneutrale kantoorrenovatie naar voren.

  8. On the Testing of Renovations Inside Historical Opera Houses

    Science.gov (United States)

    Fausti, P.; Prodi, N.

    2002-11-01

    Due to the large number of historical opera houses in Italy, many theatres have been renovated in the past, but still more will undergo major restoration in the near future. Unfortunately in this context, the quality and protection of acoustics is rarely considered as an issue of its own. As a consequence, the renovations are hardly ever accompanied by proper scientific and technical support. In this paper, the acoustical impact of works inside the Teatro Municipale "R.Valli" in Reggio Emilia, including the restoration of the main hall and the construction of a new acoustic shell, will be dealt with. Surveys were held in the theatre before renovation and were repeated with identical procedure and instruments after its completion. By means of a comparative analysis of the architectural project and of acoustical data, the impact of major changes in the theatre can be predicted. It is shown that this approach can help in drafting an operational scheme for safeguarding the acoustics of historical opera houses.

  9. Do School Facilities Matter? The Case of the Peruvian Social Fund (FONCODES). Policy Research Working Papers No. 2229.

    Science.gov (United States)

    Paxson, Christina; Schady, Norbert R.

    Since its creation in 1991, the Peruvian Social Fund (FONCODES) has spent about $570 million funding micro-projects throughout the country. Many of these projects have involved the construction and renovation of school facilities, mainly primary schools in rural areas. FONCODES projects are driven by community demand and targeted using an index of…

  10. Aspinall Courthouse: GSA's Historic Preservation and Net-Zero Renovation Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Chang, R.; Hayter, S.; Hotchkiss, E.; Pless, S.; Sielcken, J.; Smith-Larney, C.

    2014-10-01

    The federal government is mandated with improving efficiency of buildings, incorporating renewable energy, and achieving net-zero energy operations where possible. These challenges led GSA to consider aligning historic preservation renovations with net-zero energy goals. The Wayne N. Aspinall Federal Building and U.S. Courthouse (Aspinall Courthouse), in Grand Junction, Colorado, is an example of a renovation project that aimed to accomplish both historic preservation and net-zero energy goals.

  11. How to get residents/owners in housing cooperatives to agree on sustainable renovation

    Energy Technology Data Exchange (ETDEWEB)

    Lappegard Hauge, A. [SINTEF Building and Infrastructure, P.O. Box 124, Blindern, 0314 Oslo (Norway); Thomsen, J. [SINTEF Building and Infrastructure, 7465 Trondheim (Norway); Loefstroem, E. [SINTEF Building and Infrastructure, 7491 Trondheim (Norway)

    2013-05-15

    What factors increase the chance that residents/owners in housing cooperatives agree on sustainable energy efficient renovation? Based on 30 qualitative interviews with professional advisors in cooperative housing associations and chairman/board and residents in three chosen case studies, an analysis of opportunities and barriers for making a common decision on renovation is performed. Success criteria and barriers are found on the societal level as well as on the organizational/individual level. The barriers and success criteria identified on the societal level are: knowledge level on energy-efficient renovation among relevant actors, owner structure of the housing cooperative, and existing regulations and incentives. On the organizational and individual level, the following categories influencing renovation processes were identified: the time frame and organization of the process, understanding the residents' needs, economy, the information given, and the existence of available exemplary projects and role models. Based on the results of the study, ten guidelines that contribute to more successful decision making processes and increase the chances of sustainable energy efficient renovation in housing cooperatives are presented.

  12. Building a Construction Curriculum for Your School District

    Science.gov (United States)

    Ruder, Robert

    2010-01-01

    Embracing the notion of going green, an affluent school district in Pennsylvania spent $83 million as part of the high school's renovation and expansion project. The three-level addition is now equipped with self-dimming lights, energy-efficient windows, a rooftop solar water heater, and a geothermal cooling and heating system. As a bonus for…

  13. The Integrated Renovation Process

    DEFF Research Database (Denmark)

    Galiotto, Nicolas

    and constructivist multiple criteria decision-making analysis method is selected for developing the work further. The method is introduced and applied to the renovation of a multi-residential historic building. Furthermore, a new scheme, the Integrated Renovation Process, is presented. Finally, the methodology...... is applied to two single-family homes. In practice, such a scheme allowed most informational barriers to sustainable home renovation to be overcome. The homeowners were better integrated and their preferences and immaterial values were better taken into account. They assimilated the multiple benefits...... to keep the decision making process economically viable and timely, the process still needs to be improved and new tools need to be developed....

  14. Integrated Renovation Process

    DEFF Research Database (Denmark)

    Galiotto, Nicolas; Heiselberg, Per; Knudstrup, Mary-Ann

    2016-01-01

    renovation to be overcome. The homeowners were better integrated and their preferences and immaterial values were better taken into account. To keep the decision-making process economically viable and timely, the process as known today still needs to be improved, and new tools need to be developed....... This paper presents a new scheme: the integrated renovation process. One successful case study is introduced, and recommendations for future developments needed in the field are provided....

  15. Sidwell Friends Quaker School, Washington, DC, by KieranTimberlake Architects

    DEFF Research Database (Denmark)

    Vibæk, Kasper Sánchez; Stylsvig Madsen, Ulrik

    2012-01-01

    In 2006 the new Middle School Building on the campus of Sidwell Friends School in Washington DC was completed at a cost of $28 million. The project is a renovation and addition to a fifty-year-old educational facility transforming the building and the surrounding landscape into a green expression...

  16. Maturity model for strategic collaboration in sustainable building renovation

    DEFF Research Database (Denmark)

    Johansen, Jakob Berg; Jensen, Per Anker; Thuesen, Christian

    2017-01-01

    To enable the construction industry to execute sustainable renovation projects which entails a reduction in use of resources, an increase in productivity and a more socially sustainable construction process, new tools are needed. A maturity model can be a simple and effective tool for a company...

  17. The renovation of the Main Building is approaching completion

    CERN Multimedia

    Anaïs Schaeffer

    2011-01-01

    The renovation work under way in the CERN Main Building should be completed by June. From the floors to the ceilings, everything has been done to give this historic building a new lease of life.     Taken in the early 60s, this picture illustrates how light maintenance was a challenge for the auditorium in CERN’s main building.   Nobody who has recently had to shimmy between the cables, ladders and toolboxes deposited around the main hall of Building 500 to get to the post office, the bank or Restaurant 1 can be oblivious to the fact that the ground floor of the Main Building has been getting a face-lift. The renovation work, which started with the first-floor concourse in June 2010, should be finished over the next couple of months. The first-floor renovations, now almost complete, set the tone for the rest of the project. The floor and ceiling, both fitted with special acoustic materials for efficient noise damping, have been completely refurbished and the Building ...

  18. Gaps in tools assessing the energy implications of renovation versus rebuilding decisions

    DEFF Research Database (Denmark)

    Goldstein, Benjamin Paul; Herbøl, Mads; Meza, Maria Josefina Figueroa

    2013-01-01

    to evaluate project level energy-related decisions than at larger scales. Information gaps identified within assessment tools lead to uncertainty for decision makers about which option improves energy efficiency. In the case of a number of large-scale EU building renovating/renewing projects these tools have......The state of building stocks changes over time. Owners and municipalities face the choice to renovate or rebuild buildings to improve energy efficiency. This review addresses how current sustainability assessment tools support these decisions. It finds that advanced tools are better tailored...... been scarcely used or merely suggested during planning. Recent advances in sustainability assessment tools can begin to close some of the existing knowledge gaps, while incentives and stricter legislation may improve their usage rates....

  19. Kinds of initial billets in renovation technologies

    Directory of Open Access Journals (Sweden)

    V. M. Yaroslavtsev

    2014-01-01

    Full Text Available Nowadays, technologists in charge of repair, restoration, modernization, and utilization of engineering and other tangible objects widely use the concepts "renovation" and "renovation technologies" pioneered at BMSTU. In forming a new field of science these concepts, in the proper sense of the word, are of composite, generalized character. They concern all the activities and technologies aimed at increasing an object resource or its lifecycle extension, including object material recycling.In the cutting-edge renovation technologies an object (part, assembly, machine, etc. damaged in the operating process is considered to be an initial billet. In renovation, one of the most widespread kinds of initial billets is a damaged part.Such a part can be used again, if, for example, it has saved its material properties in full measure while only contact surfaces or parts of these surfaces have become damaged, and at a point of renovation they can be restored for recycling. If a part has lost its initial properties in full bulk of material, it may be reusable in the assemblies and machines with less rigid requirements for material properties.Or in case of properties loss below the permissible level a damaged part-billet is utilized. Thus, the part-billet state at the point of renovation defines the kind of renovation technology and the main (basic technological method to effect on the damaged part, as well as a set and a sequence of technological methods in general manufacturing process of renovation.However renovation technologies are used not only at the repair and restoration stages after operation-service. So, at the manufacturing stage of a new product to provide the quality to raise a resource are applied the same technological methods as renovation technologies for the objects damaged at the stage of operation. Besides, it is known that at the manufacturing stage a part quality depends not only on the last operation, but also on the features of

  20. Overheating assessment of energy renovations

    DEFF Research Database (Denmark)

    Psomas, Theofanis Ch.; Heiselberg, Per Kvols; Duer, Karsten

    2016-01-01

    In many post-occupancy studies of renovated houses elevated temperatures have been documented. This article presents in which situations overheating need to be addressed and which renovation measures are causing this need. The analysis contains representative houses from central and north Europe...

  1. The Optimal Time of Renovating a Mall

    OpenAIRE

    K.C. Wong; George Norman

    1994-01-01

    This paper presents a maximization model determining the optimal time at which a mall should be renovated. The analysis is constructed on the assumption of a decreasing rental income over time as a mall ages. It is then shown that the optimal renovation period achieves a balance between the marginal cost and benefits of delaying renovation. We show how this balance is affected by changes in the discount rate, net rental incomes, and renovation costs. Numerical simulations are used to demonstr...

  2. Building renovations in BIM systems

    Directory of Open Access Journals (Sweden)

    Smutný Marian

    2018-01-01

    Full Text Available Renovation of buildings is a demanding challenge for computer systems. Nowadays, complex 3D models of historic buildings can be scanned and modelled, including sculptural filigrees and stucco decorations with possibility to generate different projections, cross-sections and elevations according to descriptive geometry rules. However, all of this falls within the field of “3D Modelling”. BIM systems work with elements that have to be classified according to their purpose, or according to the way they are realized. The system is then able to sort, filter or group them. Also, it is able to compute their bill of quantity and quality based on their attributes. Last but not least, it has to be able to schematically display civil engineering drawings on the basis of classification of the elements which differ considerably from the display of descriptive geometry. In regular constructions, repeatability and predictability of the links between the elements suit computer systems. Thus, the issue of building renovations in BIM systems is to find a balance between modelling irregular constructions and irregular space arrangements, while maintaining the ability to interact with other BIM elements.

  3. A BIM-based system for demolition and renovation waste estimation and planning.

    Science.gov (United States)

    Cheng, Jack C P; Ma, Lauren Y H

    2013-06-01

    Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry

  4. Disseny d'una microxarxa amb generació renovable

    OpenAIRE

    Durich Serra, Ruben

    2016-01-01

    El present projecte pretén abordar l’estudi dels costs de generació d’energia elèctrica renovable de la tecnologia solar-fotovoltaica per tal de formar part del disseny d’una microxarxa de generació d’energia elèctrica. Durant la realització del projecte s’ha realitzat una breu introducció a les microxarxes de distribució d’energia elèctrica i als seus reptes. Per estudiar el cost de generació d’energia fotovoltaica s’ha utilitzat la metodologia del Levelized Cost of Energy ...

  5. Method for Developing and Assessing Holistic Energy Renovation of Multi-Storey Buildings

    DEFF Research Database (Denmark)

    Eriksen, Marlene Stenberg Hagen; Rode, Carsten; Bjarløv, Søren Peter

    A large part of the Danish building stock is from the post-war era, and thus there is an immense need for renovation within a few years. Also there is a persistent focus on energy use in buildings as it corresponds to about 40% of the total energy use in Denmark. However to secure durable solutions....... The assessment method is tested on two case buildings, and the assessment involves all relevant stakeholders including building owner, users, and caretakers. An element of the project looks to the development of new products and solutions for renovation for buildings. As part of the method, user involvement...

  6. Analysis of promising sustainable renovation concepts

    DEFF Research Database (Denmark)

    Vanhoutteghem, Lies; Tommerup, Henrik M.; Svendsen, Svend

    This report focuses on analyses of the most promising existing sustainable renovation concepts, i.e. full-service concepts and technical concepts, for single-family houses. As a basis for the analyses a detailed building stock analysis was carried out. Furthermore, as a basis a general working...... method for proposals on package solutions for sustainable renovation was described. The method consists of four steps, going from investigation of the house to proposal for sustainable renovation, detailed planning and commissioning after renovation. It could be used by teams of consultants...... of the building envelope and the electricity required to run the system. Positive impact on the indoor environment can be expected. Thermal comfort will be improved by insulation and air-tightness measures that will increase surface temperatures and reduce draught from e.g. badly insulated windows. A ventilation...

  7. 75 FR 39524 - Lead-Based Paint Renovation, Repair and Painting, and Pre-Renovation Education Activities in...

    Science.gov (United States)

    2010-07-09

    ..., Repair and Painting, and Pre- Renovation Education Activities in Target Housing and Child Occupied... pre-renovation education program in accordance with section 406(b) of TSCA, 15 U.S.C. 2686(b). This... and child-occupied facilities in the State of Oregon. Individuals and firms falling under the North...

  8. Promotion of Sustainable Renovation in Europe

    DEFF Research Database (Denmark)

    Fokaides, Paris A.; Kanarachos, Andreas; Kanarachos, Georgette

    2013-01-01

    pressing the energy renovation of buildings. Both the obstacles and the contribution of national regulations will be discussed, towards promotion of sustainable renovation in Europe today. This study is also expected to report on research initiatives currently being undertaken in Europe on the energy...

  9. Renovating Interior Office Space: What a Manager Needs To Consider.

    Science.gov (United States)

    Babey, Evelyn R.

    When planning an office renovation, a manager should design an office layout that is efficient and should consider the psychological aspects of office design, including sound level, color harmony, and lighting. The manager must also have a good understanding of all phases of the project plan and the timing involved. There are basically five phases…

  10. KPI-Driven Methodology for Urban Renovation at District Level. Sustainable Strategic Urban Planning

    Directory of Open Access Journals (Sweden)

    Cristina Criado

    2018-03-01

    Full Text Available Sustainable urban renovation is characterized by multiple factors (e.g., technical, socio-economic, environmental and ethical perspectives, different spatial scales and a number of administrative structures that should address the evaluation of alternative scenarios or solutions. This defines a complex decision problem that includes different stakeholders where several aspects need to be considered simultaneously. In spite of the knowledge and experiences during the recent years, there is a need of methods that lead the decision-making processes. In response, a methodology based on a KPI-driven approach for urban renovation at district level is proposed in the European Smart City project CITyFiED. The methodology is a procedure with the energy efficiency as main pillar and the local authorities as client. It is composed of seven phases that ensures an effective dialogue among all the stakeholders, aiming to understand the objectives and needs of the city to deliver a set of customized Strategies for Sustainable Urban Renovation. In order to provide guidance and quantitative criteria, three levels of indicators are integrated into the approach: City Level Indicators (L1 at city & district level, Project Level KPIs (L2, and Impact Assessment Indicators at city level (L3.

  11. Bæredygtige systemleverancer ved renovering

    DEFF Research Database (Denmark)

    Schipull Kauschen, Jan

    2014-01-01

    System (PSS). This thesis presents the hypothesis that system deliveries may be cast as Product-Service Systems, creating the pre-conditions for sustainable integrated product deliveries. Case Studies Renovation case studies have evinced partial use of system deliveries in recent years; however......-of-sales er dermed relevant for bæredygtige leverancer, der disse kræver at ansvaret forbliver hos systemejeren over leverancens hele livscyklus, fra produktion til bortskaffelsen. Denne type produkt kendes fra andre områder under navnet Product-Service-System (PSS). I afhandlingen opstilles derfor hypotesen...... om at systemleverancer kan udformes som Product-Service-Systems og at dermed skabes forudsætningerne for bæredygtige systemleverancer. Casestudier Casestudier om renovering har desuden vist, at der til dels anvendes systemleverancer til renovering i de sidste år, men at disse leverancer sjældent er...

  12. Extensive renovation the pathology of heritage building

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2015-01-01

    The pathology of heritage buildings is often related to renovation initiatives typically initiated by implementing energy savings measures.......The pathology of heritage buildings is often related to renovation initiatives typically initiated by implementing energy savings measures....

  13. Extensive renovation the pathology of heritage buildings

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2015-01-01

    The pathology of heritage buildings is often related to renovation initiatives typically initiated by implementing energy savings measures.......The pathology of heritage buildings is often related to renovation initiatives typically initiated by implementing energy savings measures....

  14. How about a slightly more? The PLUS energy school Rostock. A refurbishment project serving as a model; Darf's ein bisschen mehr sein? Die PLUS Energieschule Rostock. Ein Sanierungsobjekt, das Schule machen koennte

    Energy Technology Data Exchange (ETDEWEB)

    Wollensak, Heidi [Wollensak Architekten, Wismar (Germany); Institut fuer Gebaeude + Energie + Licht Planung, Wismar (Germany)

    2012-11-01

    Since the implementation of the Energy Saving Ordinance (EnEV) the construction industry makes every effort of energy-optimized construction and renovation. In order to implement the recent energy policy objectives of the Federal Government also the Federal Ministry of Economics and Technology (Berlin, Federal Republic of Germany) set a signal: Within the research project 'Energy-efficient schools' under the program 'Energy-optimized building' three selected schools should produce more primary energy than it needs for its own operation. The European School of Rostock (Federal Republic of Germany) is the largest of these PLUS energy schools - the first phase of construction will soon be occupied.

  15. Effects of pasture renovation on hydrology, nutrient runoff, and forage yield.

    Science.gov (United States)

    de Koff, J P; Moore, P A; Formica, J; Van Eps, M; DeLaune, P B

    2011-01-01

    Proper pasture management is important in promoting optimal forage growth and reducing runoff and nutrient loss. Pasture renovation is a management tool that improves aeration by mechanically creating holes or pockets within the soil. Pasture renovation was performed before manure application (poultry litter or swine slurry) on different pasture soils and rainfall simulations were conducted to identify the effects of pasture renovation on nutrient runoff and forage growth. Renovation of small plots resulted in significant and beneficial hydrological changes. During the first rainfall simulation, runoff volumes were 45 to 74% lower for seven out of eight renovated treatments, and infiltration rates increased by 3 to 87% for all renovated treatments as compared with nonrenovated treatments. Renovation of pasture soils fertilized with poultry litter led to significant reductions in dissolved reactive P (DRP) (74-87%), total P (TP) (76-85%), and total nitrogen (TN) (72-80%) loads in two of the three soils studied during the first rainfall simulation. Renovation did not result in any significant differences in forage yields. Overall, beneficial impacts of renovation lasted up to 3 mo, the most critical period for nutrient runoff following manure application. Therefore, renovation could be an important best management practice in these areas.

  16. Distinctiveness of Initial Preform Properties in Renovation

    Directory of Open Access Journals (Sweden)

    V. M. Yaroslavtsev

    2015-01-01

    Full Text Available Technologies of renovation form a special group of resource-and energy saving technological processes as they are, by definition, already aimed either at increasing resource of the objects satisfying needs of the society life support and practical activities in different spheres, or at extension of their life cycle including a reuse of material from which they are made. Renovation is used where there is a material object, which does not meet requirements of standard or technical documentation.A characteristic feature of the renovation technologies is lack of procedure for a choice of the preform as in all cases an initial preform is the renovation object itself. Thus each object, acting as an initial preform, has the exclusively individual properties, including technological ones.Distinctiveness of renovation object properties is correlated, first of all, with the personified conditions of formation and (or change of condition of their properties in time at all stages of life cycle (production – transportation – warehousing – operation starting with a preform material when manufacturing under all types of loadings (technological and operational. As a result each object forms its "history" of loading and damages and, therefore, its information base which has to consider the phenomenon of “heredity of life cycle”. The term "heredity of life cycle" characterizes information support of object at any moment under review, including both information of technological inheritance, and data of operational heredity.As a result at every moment of time we have a product with a set of new, uncertain properties caused by the phenomena of heredity of life cycle. These properties are individual for each object to be renovated, which changed its status for the status of initial preform for different types of renovation technologies. This is one of the most important distinctions of renovation technology from the technology used to manufacture a new

  17. Method for a component-based economic optimisation in design of whole building renovation versus demolishing and rebuilding

    International Nuclear Information System (INIS)

    Morelli, Martin; Harrestrup, Maria; Svendsen, Svend

    2014-01-01

    Aim: This paper presents a two-fold evaluation method determining whether to renovate an existing building or to demolish it and thereafter erect a new building. Scope: The method determines a combination of energy saving measures that have been optimised in regards to the future cost for energy. Subsequently, the method evaluates the cost of undertaking the retrofit measures as compared to the cost of demolishing the existing building and thereafter erecting a new one. Several economically beneficial combinations of energy saving measures can be determined. All of them are a trade-off between investing in retrofit measures and buying renewable energy. The overall cost of the renovation considers the market value of the property, the investment in the renovation, the operational and maintenance costs. A multi-family building is used as an example to clearly illustrate the application of the method from macroeconomic and private financial perspectives. Conclusion: The example shows that the investment cost and future market value of the building are the dominant factors in deciding whether to renovate an existing building or to demolish it and thereafter erect a new building. Additionally, it is concluded in the example that multi-family buildings erected in the period 1850–1930 should be renovated. - highlights: • Development of a method for evaluation of renovation projects. • Determination of an economic optimal combination of various energy saving measures. • The method compared the renovation cost to those for demolishing and building new. • Decision was highly influence by the investment cost and buildings market value. • The results indicate that buildings should be renovated and not demolished

  18. A BIM-based system for demolition and renovation waste estimation and planning

    International Nuclear Information System (INIS)

    Cheng, Jack C.P.; Ma, Lauren Y.H.

    2013-01-01

    Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results

  19. A BIM-based system for demolition and renovation waste estimation and planning

    Energy Technology Data Exchange (ETDEWEB)

    Cheng, Jack C.P., E-mail: cejcheng@ust.hk [Department of Civil and Environmental Engineering, The Hong Kong University of Science and Technology (Hong Kong); Ma, Lauren Y.H., E-mail: yingzi@ust.hk [Department of Civil and Environmental Engineering, The Hong Kong University of Science and Technology (Hong Kong)

    2013-06-15

    Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results

  20. Renovation of a mechanical engineering senior design class to an industry-tied and team-oriented course

    Science.gov (United States)

    Liu, Yucheng

    2017-11-01

    In this work, an industry-based and team-oriented education model was established based on a traditional mechanical engineering (ME) senior design class in order to better prepare future engineers and leaders so as to meet the increasing demand for high-quality engineering graduates. In the renovated curriculum, industry-sponsored projects became the most important course component and critical assessment tool, from which problem-solving skills as well as employability skills of the ME students can be fully developed. Hands-on experiences in finite element analysis (FEA) modelling and simulation were also added into the renovated curriculum to promote the application of FEA on engineering design and assessment. Evaluation of the renovated course was conducted using two instruments and the results have shown that the course made the ME senior students more prepared for their future career and a win-win model was created between the industry partner and the ME programme through it. Impact of the renovated syllabus on Accreditation Board for Engineering Technology goals was discussed. Based on the current progress, a more substantial change is being planned to further improve the effectiveness and practicability of this design course. The renovated course was started to offer to the ME senior students at Mississippi State University.

  1. Venezuela's Bolivarian Schools Project.

    Science.gov (United States)

    Diaz, Maria Magnolia Santamaria

    2002-01-01

    Discusses efforts by the Venezuelan government to improve the nation's school infrastructure through the Bolivarian Schools Project administered by the Ministry of Education, Culture and Sport. The project set educational principles which are guiding current school building efforts. (EV)

  2. Project governance: "Schools of thought"

    Directory of Open Access Journals (Sweden)

    Michiel Christiaan Bekker

    2014-02-01

    Full Text Available The terminology, definition and context of project governance have become a focal subject for research and discussions in project management literature. This article reviews literature on the subject of project governance and categorise the arguments into three schools of thought namely the single-firm school, multi-firm school and large capital school. The single-firm school is concerned with governance principles related to internal organisational projects and practice these principles at a technical level. The multi-firm school address the governance principles concerned with two of more organisations participating on a contractual basis on the same project and focus their governance efforts at the technical and strategic level. The large capital school consider projects as temporary organisations, forming their own entity and establishing governance principles at an institutional level. From these schools of thought it can be concluded that the definition of project governance is dependent on the type of project and hierarchical positioning in the organisation. It is also evident that further research is required to incorporate other governance variables and mechanisms such as transaction theory, social networks and agency theory. The development of project governance frameworks should also consider the complexity of projects spanning across international companies, across country borders and incorporating different value systems, legal systems, corporate governance guidelines, religions and business practices.

  3. Renovation of historic, protected buildings in Geneva

    Energy Technology Data Exchange (ETDEWEB)

    Weber, W.; Haefeli, P.

    2009-07-01

    This report for the Swiss Federal Office of Energy (SFOE) reports on work done within the IEA Solar Heating and Cooling Program's Task 37. The objective of SHC Task 37 is to develop a solid knowledge base on how to renovate housings to a very high energy standard and how to develop strategies that support the market penetration of such renovation methods. The report deals with four listed buildings of historical value in Geneva, Switzerland, and examines various aspects of the renovation. These aspects include a discussion of the techniques applied, including internal and external insulation. Simulation methods used and results obtained are discussed. The improvements made are evaluated.

  4. Tourist Quarter “Chinese-Baroque” of Dao Way District in Harbin City: experience, problems and perspectives of renovation.

    Directory of Open Access Journals (Sweden)

    Levoshko Svetlana

    2016-01-01

    Full Text Available This article analyzes results of an unique experience of the Dao Wai historic district renovation project in Harbin of the 2010th. It includes an interpretation of the stylistic features of the Dao Wai building. Also, there was made a presumptive conclusion about the origins of the “Chinese Baroque”, which is now famous Dao Wai, combining European order architecture and far Eastern decorative tradition. Presumptive conclusion was based on the construction area observing in 2011-2016 and on the Chinese sources. As a result of renovation, there was formed a new public space with high tourism potential. Social value and status of the Dao Wai has significantly grown. The significant cost increase of real estate and provided services is an essential consequence of the gentrification method. There are were noted increased problems of the native people forced to move from the center to the outskirts of the city. Also, this article analyzes the current stage of the second phase design of Dao Wai renovation project and the perspectives for its implementation.

  5. Energy renovation of an old single-family house

    DEFF Research Database (Denmark)

    Overgaard, L.L.; Tommerup, Henrik M.; Svendsen, Svend

    2005-01-01

    After having identified a large potential for profitable energy renovation of the existing building stock, a demonstration project was carried out in practice. This paper deals with the methods and results from the demonstration project concerning a 161 m² poorly insulated single-family house built...... saving improvements carried out in the project are “easy to carry out” and cost-beneficial measures such as cavity wall insulation, loft insulation, insulation of walls under windows and a new second window-frame with energy-saving glass. The work was carried out by professional contractors at a total......). If a conservative way of financing the building work of 157,000 DKK is assumed, the first year’s cost equals DKK 8,500 and the house owner will gain a net saving the first year of DKK 7,500....

  6. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL's weapons research, development, and testing (WRD ampersand T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL's inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system

  7. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system.

  8. Energy renovation practices in Danish homes. The influence of energy labels on home renovation practices

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, Toke Haunstrup; Gram-Hanssen, Kirsten [Danish Building Research Institute, Aalborg University, Dr. Neergaards Vej 15, DK-2970 Hoersholm (Denmark); Adjei, Afi [Building Research Establishment Ltd. BRE, Bucknalls Lane, Garston, WD25 9XX Watford (United Kingdom); De Best-Waldhober, Marjolein [Energy research Centre of the Netherlands ECN, Policy Studies, Amsterdam (Netherlands)

    2012-02-15

    Heating of dwellings represents a major policy challenge for the transition to a low carbon society. In Denmark, heating of dwellings represents about 25% of the total Danish final energy consumption and about 13% of the total CO2 emission. The majority of this is related to heating of older dwellings, and as the rate of replacement is low, the main potential for energy saving is to improve the energy efficiency of the existing dwelling stock through energy renovation. This paper provides an analysis of Danish experiences with energy labels (also known as the Energy Performance Certificate, EPC), which indicate the energy efficiency of buildings and include recommendations for improvements. The aim of the EPC is to motivate homeowners to do energy improvements. In Denmark, energy audit schemes date back to the early 1980s and energy rating of houses (energy labelling) was introduced in 1997. The long history of energy audit schemes and energy labelling makes Denmark an interesting case for the study of the experiences with and impact of this kind of policy measure. With the EU Energy Performance of Buildings Directive (EPBD) from 2002, an energy labelling scheme similar to the Danish scheme introduced in 1997 is now in use in all EU member states. The focus of this paper is on the homeowners' experience and use of the EPC and the key research questions are: How do the homeowners understand and use the EPC? Does the EPC have an influence on home energy renovation practices? The analysis is based on results from a survey of Danish homeowners who have purchased a home with an EPC within recent years. The Danish survey is part of the European project IDEAL EPBD, which was funded by the European Commission under the Intelligent Energy Europe programme and run from 2008 to 2011. The results indicate a rather limited influence of the EPC on Danish homeowners' home energy renovation practices. Also, the results show that even though most homeowners find the label

  9. Dwelling thermal renovation: which stakes, which solutions?

    International Nuclear Information System (INIS)

    Delduc, Paul; Demeulenaere, Laurence; Verdure, Mathieu; Ayong Le Kama, Alain; Fuk Chun Wing, Dimitri; Kiefer, Noemie; Mauroux, Amelie; Charlier, Dorothee; Hini, Sihame; Pinto Silva, Kleber; Giraudet, Louis Gaetan; Nauleau, Marie-Laure; Daussin-Benichou, Jeanne-Marie; Teissier, Olivier; Finidori, Esther; Grandjean, Alain; Allibe, Benoit; Gadrat, Pierre; Couriol, Aude; Menard, Francois; Rouquette, Celine; Houriez, Guillaume; Francois, Dominique; Aubert, Celine; Canardon, Daniel

    2015-01-01

    This publication proposes three sets of contributions. The first one addresses context and stakes. The contributions propose: a literature review on household behaviour and investments in energy efficiency, a focus on the key role of dwellings in energy transition through a comparative study of the four pathways of the National Debate for Energy Transition, and a discussion about consensus and uncertainties regarding the determining factors of heating temperature in dwellings. The second set addresses public policies and their assessment: improvement of the technical-economical assessment of the benefit of dwelling energetic renovations, discussion of the organisation and results of a survey on dwelling, equipment, and energy needs and uses, an analysis of several measures aimed at reaching objectives of energy efficiency of dwellings, a discussion of renovation works quality, a discussion of the impact of the sustainable development tax credit on thermal renovation, the optimisation of energy renovation in co-properties by third party financing, some foreign examples of policies in favour of dwelling thermal renovation. The third set of contributions addresses the needed technical, organisational and market evolutions: how the building sector can face the challenges of energy transition, the possibilities to propose innovative solutions adapted to existing housing buildings, and a comparative analysis of material and building equipment costs and market structures in Europe. Other texts are proposed in appendix: the origin of the Phebus survey, a description of incentive arrangements, and a map of climate zones in France

  10. The building stock from perspective of change - renovation roadmap

    Energy Technology Data Exchange (ETDEWEB)

    Airaksinen, M., Email: miimu.airaksinen@vtt.fi

    2012-06-15

    By 2050, population, society and economic structures will have changed several times. The long and short-term goals and objectives concerning our built environment are mutually contradictory. Determining objectives or creating scenarios for the future built environment is fruitless. We should approach the development of the built environment from the perspective of change and improve the flexibility and adaptability of the built environment. For the users, a built environment meeting their basic needs is part of sustainable development. Identified short-range renovation needs include eliminating damp and mould problems, improving energy and eco-efficiency, removing obstacles to mobility and adapting buildings to accommodate the needs of the elderly. Vacated areas and buildings should be recycled and offered a new life supporting a sense of community and service production. Improved energy efficiency reduces greenhouse gas emissions. Instead of renovating individual buildings, renovation of the entire area is recommended. Sustainability in construction translates into favouring recycling and renewable materials and building-specific energy systems using renewable and/or low-emission resources. It is recommended that renovations to improve energy efficiency are scheduled to coincide with other maintenance/ renovations so as to reduce costs. In renovation construction, the role of service improvement is more important than products. Improved services help to identify a solution that fulfils several customer needs, meets financial limitations and can be implemented efficiently. Companies are advised to view renovation construction as an innovative market segment entitled to its own service portfolio. Truths about new building should be discarded and new services developed based on recent study results and new technologies. (orig.)

  11. Defense Infrastructure: In-Kind Construction and Renovation Projects Initiated by DOD during Fiscal Year 2013

    Science.gov (United States)

    2015-09-01

    nation funded constructione $8,298,953e 8. Army Garrison Humphreyse Project title: Construct Middle School and Elementary Schoole Purpose...Housing and communitye Description: Provide 875-student elementary school and 1,100-student middle schoole Yongsan Relocation Pland,e Host...a child development center with adjacent outdoor play area for 195 to 225 school -age (6 to10 years) childrene Yongsan Relocation Pland,e Host

  12. Delimitation and Classified Planning Management of Functional Renovation Zone: Experience of and Discussion on Shenzhen's Practice of Urban Renewal

    Institute of Scientific and Technical Information of China (English)

    Hao Wenxuan; Tong De; Liu Qing; Feng Changchun; Liu Jinxin

    2016-01-01

    Urban renewal is one of the important issues of urban development in China.Along with its development in the contemporary time,China has seen considerable achievements and problems as well in urban renewal.Taking into account that Shenzhen has carried out plenty of explorations on urban planning renewal,this paper takes it as an example to firstly analyze the plights of its urban renewal planning,the shortcomings of its urban renewal projects,and the advantages of functional renovation zones to manifest the necessity of the delimitation and classified planning management of functional renovation zone in urban renewal.It then summarizes the experience of its urban renewal unit planning in terms of the methods of zoning and implementation,and finally discusses the conceptual connotations of functional renovation zone,as well as the logic and characteristics of renovations of its delimitation and classified planning management,in hope of providing other Chinese cities with some references.

  13. LMHC/TWRS year 2000 equipment project renovation and contingency plan

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been completed to assess, renovate and document tank farm field equipment year 2000 compliance. A communication plan has also been prepared (see section 8.0). The objective of the program was to assure that no adverse effects occur in tank farm operations as a result of equipment malfunction due to the advent of year 2000. The purposes of this document are to: describe the process used to assess field equipment; document items found to be compliant; document items found to be non-compliant including options for making the equipment year 2000 functional and/or tolerant; describe location and management of field equipment year 2000 documentation; assess overall vulnerability of TWRS field equipment with regard to year 2000 problems and describe plans to communicate year 2000 equipment review results and corrective actions

  14. Prerequisites for Successful Strategic Partnerships for Sustainable Building Renovation

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Johansen, Jakob Berg; Thuesen, Christian

    The purpose of this paper is to identify the prerequisites for establishing successful strategic partnerships in relation to renovating buildings sustainably. Establishing strategic partnerships is in the paper seen as a potential way to make building renovation more sustainable in Denmark...... and analysis of strategic partnerships models as well as typical processes used in building renovation. Experiences from development of new strategic partnerships have particularly been found in the UK and Sweden. Based on two workshops with practitioners representing the whole value chain in the construction...... industry and analyses of two exemplary cases the paper suggests prerequisites for establishing successful strategic partnerships for sustainable building renovation. The results show that strategic partnerships are collaborations set up between two or more organizations that remain independent...

  15. RENOVE: an organization net for the third sector promoting the development of the renewable sources in Brazil; RENOVE: uma rede de organizacoes do terceiro setor promovendo o desenvolvimento das fontes renovaveis no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Claudio Moises; Souza, Aurelio Andrade de [Winrock International Brasil, Salvador, BA (Brazil)]. E-mail: cribeiro@winrock.org.br; Rosa, Fabio Luis de Oliveira [RENOVE - Rede Nacional das Organizacoes da Sociedade Civil para as Energias Renovaveis, Porto Alegre RS (Brazil). Secretaria Executiva]. E-mail: fabrosa@plug-in.com.br

    2002-07-01

    The National Network of Civil Society Organizations for Renewable Energy RENOVE was founded in Brazil on June 17th, 2000, to promote the use and application of renewable energy in production and integrated activities, especially in isolated rural areas, environmental protection areas and their surroundings. The network is formed of sixteen founding members. It promotes integration activities among the members, and is currently preparing to participate in the process of universalization of electricity services in Brazil. RENOVE is now implementing its Executive Secretary to optimize and carry out its actions. Cooperation between members has already lead to joint renewable energy application projects and training initiatives besides declarations in support of the development of a national renewable energy policy. (author)

  16. Early stage decision support for sustainable building renovation – A review

    DEFF Research Database (Denmark)

    Nielsen, Anne Nørkjær; Jensen, Rasmus Lund; Larsen, Tine Steen

    2016-01-01

    Decision support tools for building renovation are important as assistance to professional building owners when setting goals for sustainability, and for making sure that the objectives are met throughout the design process, both when renovating a single building or choosing renovation actions wi...

  17. Renovation of the Stockholm sewerage system

    International Nuclear Information System (INIS)

    Sandin, Paer

    1987-01-01

    Within a few years Stockholm will let all its treated wastewater into the Saltsjoen. The Saltsjoen is the inner part of the Stockholm Archipelago, which is one of the finest recreation areas in Sweden and where many Stockholmians spend a great deal of their leisure time. That is one reason why it is so important that all wastewater is treated before it reaches the recipient. A sewerage system in bad condition means that the risk of not allowed/unplanned overflows is increased. In order to prevent overflows we drafted 'Plan 83' which tells us how our sewerage system shall be constructed in the future and what measures has to be made in the system. Renovations of the existing pipes is one method to get a well functioning sewer system. Today we have made about 50 different objects at a total length of 6000 m. Why do we renovate sewers and why are we attempting to develop methods for pipe renovations?

  18. Data of cost-optimal solutions and retrofit design methods for school renovation in a warm climate.

    Science.gov (United States)

    Zacà, Ilaria; Tornese, Giuliano; Baglivo, Cristina; Congedo, Paolo Maria; D'Agostino, Delia

    2016-12-01

    "Efficient Solutions and Cost-Optimal Analysis for Existing School Buildings" (Paolo Maria Congedo, Delia D'Agostino, Cristina Baglivo, Giuliano Tornese, Ilaria Zacà) [1] is the paper that refers to this article. It reports the data related to the establishment of several variants of energy efficient retrofit measures selected for two existing school buildings located in the Mediterranean area. In compliance with the cost-optimal analysis described in the Energy Performance of Buildings Directive and its guidelines (EU, Directive, EU 244,) [2], [3], these data are useful for the integration of renewable energy sources and high performance technical systems for school renovation. The data of cost-efficient high performance solutions are provided in tables that are explained within the following sections. The data focus on the describe school refurbishment sector to which European policies and investments are directed. A methodological approach already used in previous studies about new buildings is followed (Baglivo Cristina, Congedo Paolo Maria, D׳Agostino Delia, Zacà Ilaria, 2015; IlariaZacà, Delia D'Agostino, Paolo Maria Congedo, Cristina Baglivo; Baglivo Cristina, Congedo Paolo Maria, D'Agostino Delia, Zacà Ilaria, 2015; Ilaria Zacà, Delia D'Agostino, Paolo Maria Congedo, Cristina Baglivo, 2015; Paolo Maria Congedo, Cristina Baglivo, IlariaZacà, Delia D'Agostino,2015) [4], [5], [6], [7], [8]. The files give the cost-optimal solutions for a kindergarten (REF1) and a nursery (REF2) school located in Sanarica and Squinzano (province of Lecce Southern Italy). The two reference buildings differ for construction period, materials and systems. The eleven tables provided contain data about the localization of the buildings, geometrical features and thermal properties of the envelope, as well as the energy efficiency measures related to walls, windows, heating, cooling, dhw and renewables. Output values of energy consumption, gas emission and costs are given for a

  19. Delimitation and Classified Planning Management of Functional Renovation Zone: Experience of and Discussion on Shenzhen’s Practice of Urban Renewal

    Institute of Scientific and Technical Information of China (English)

    Hao; Wenxuan; Tong; De; Liu; Qing; Feng; Changchun

    2016-01-01

    Urban renewal is one of the important issues of urban development in China.Along with its development in the contemporary time,China has seen considerable achievements and problems as well in urban renewal.Taking into account that Shenzhen has carried out plenty of explorations on urban planning renewal,this paper takes it as an example to firstly analyze the plights of its urban renewal planning,the shortcomings of its urban renewal projects,and the advantages of functional renovation zones to manifest the necessity of the delimitation and classified planning management of functional renovation zone in urban renewal.It then summarizes the experience of its urban renewal unit planning in terms of the methods of zoning and implementation,and finally discusses the conceptual connotations of functional renovation zone,as well as the logic and characteristics of renovations of its delimitation and classified planning management,in hope of providing other Chinese cities with some references.

  20. Indoor Air Quality of Residential Building Before and After Renovation

    Science.gov (United States)

    Sánka, Imrich; Földváry, Veronika

    2017-06-01

    This study investigates the impact of energy renovation on the indoor air quality of an apartment building during the heating season. The study was performed in one residential building before and after its renovation. An evaluation of the indoor air quality was performed using objective measurements and a subjective survey. The concentration of CO2 was measured in the bedrooms, and a sampling of the total volatile compounds (TVOC) was performed in the living rooms of the selected apartments. Higher concentrations of CO2 and TVOC were observed in the residential building after its renovation. The concentrations of CO2, and TVOC in some of the cases exceeded the recommended maximum limits, especially after implementing energy-saving measures on the building. The average air exchange rate was visibly higher before the renovation of the building. The current study indicates that large-scale renovations may reduce the quality of an indoor environment in many apartments, especially in the winter season.

  1. The Strategic-Renovation Banks’ Risks Management

    Directory of Open Access Journals (Sweden)

    Yeremeychuk Raisa A.

    2017-04-01

    Full Text Available The article is aimed at developing approaches to implementation of the strategic-renovation risk management. Essence of risk theories was researched, the concept of «risk» in the bank’s management system were analyzed. On the basis of a theoretical generalization of scientific literature and the carried out analysis of existing risk management strategies to ensure the security of banking business, the strategy of renovation management has been selected. Because bank risks are part of the economic risk system, they are complex in their nature. However, given the importance of bank risks, the interpretation of their essence is still a debating matter. In a certain number of cases, their essence is replaced by the cause of occurrence, that is, all the different circumstances, factors that lead to the losses. So today, banks are considering risks, in particular, not only as a source of possible losses, but also as an opportunity to generate additional profits. An algorithm for taking a strategic-renovation decision on the banks’ risks management system has been proposed.

  2. Portsmouth Atmospheric Science School (PASS) Project

    Science.gov (United States)

    Coleman, Clarence D.; Hathaway, Roger (Technical Monitor)

    2002-01-01

    The Portsmouth Atmospheric Science School Project (PASS) Project was granted a one-year no cost extension for 2001-2002. In year three of the project, objectives and strategies were modified based on the previous year-end evaluation. The recommendations were incorporated and the program was replicated within most of the remaining elementary schools in Portsmouth, Virginia and continued in the four middle schools. The Portsmouth Atmospheric Science School Project is a partnership, which includes Norfolk State University, Cooperating Hampton Roads Organizations for Minorities in Engineering (CHROME), NASA Langley Research Center, and the City of Portsmouth, Virginia Public Schools. The project seeks to strengthen the knowledge of Portsmouth Public Schools students in the field of atmospheric sciences and enhance teacher awareness of hands on activities in the atmospheric sciences. The project specifically seeks to: 1) increase the interest and participation of elementary and middle school students in science and mathematics; 2) strengthen existing science programs; and 3) facilitate greater achievement in core subjects, which are necessary for math, science, and technical careers. Emphasis was placed on providing training activities, materials and resources for elementary students (grades 3 - 5) and middle school students (grades 6 - 8), and teachers through a CHROME club structure. The first year of the project focused on introducing elementary students to concepts and activities in atmospheric science. Year two of the project built on the first year's activities and utilizes advanced topics and activities appropriate for middle school students. During the third year of the project, in addition to the approaches used in years one and two, emphasis was placed on activities that enhanced the Virginia Standards of Learning (SOL).

  3. Science in Schools Project

    Science.gov (United States)

    Waugh, Mike

    As part of a program to increase learning and engagement in science classes 124 Victorian schools are trialing a best practice teaching model. The Science in Schools Research Project is a DEET funded project under the Science in Schools Strategy, developed in response to recent research and policy decisions at national and state levels through which literacy, numeracy and science have been identified as key priorities for learning. This major science research project aims to identify, develop and trial best practice in Science teaching and learning. The Department will then be able to provide clear advice to Victoria's schools that can be adopted and sustained to: * enhance teaching and learning of Science * enhance student learning outcomes in Science at all year levels * increase student access to, and participation in Science learning from Prep through to Year 10, and hence in the VCE as well. The nature of the SiS program will be detailed with specific reference to the innovative programs in solar model cars, robotics and environmental science developed at Forest Hill College in response to this project.

  4. The socioeconomic impact of energy saving renovation measures in urban buildings

    OpenAIRE

    Mikulić, Davor; Rašić Bakarić, Ivana; Slijepčević, Sunčana

    2016-01-01

    The purpose of the paper is to investigate the role of measures oriented to energy savings in residential buildings in the economic development at the regional level. The aim of the paper is to estimate overall socio-economic impact of energy saving renovation measures in the Croatian urban areas. Impact assessment is based on input–output methodology which is able to quantify direct and indirect effects of investment in the energy saving projects on the economic activity and employment...

  5. 77 FR 74472 - Application to Export Electric Energy; Energia Renovable S.C., LLC

    Science.gov (United States)

    2012-12-14

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-387] Application to Export Electric Energy; Energia... application. SUMMARY: Energia Renovable S.C., LLC (Energia Renovable) has applied for authority to transmit...)). On September 11, 2012, DOE received an application from Energia Renovable for authority to transmit...

  6. 40 CFR 745.326 - Renovation: State and Tribal program requirements.

    Science.gov (United States)

    2010-07-01

    ... sampling technician training programs. (ii) Procedures and requirements for the certification of renovators and dust sampling technicians. (iii) Procedures and requirements for the certification of individuals..., 2010. For the convenience of the user, the added text is set forth as follows: § 745.326 Renovation...

  7. Mobilization for energy renovation. Innovative tools for the uptake of deep renovation of the existing building stock based on behavioural insights

    OpenAIRE

    Taranu, Victoria; Verbeeck, Griet

    2015-01-01

    Mobilization for energy renovation. Innovative tools for the uptake of deep renovation of the existing building stock based on behavioural insights. In the context of climate change it is a priority to reduce the energy demand and make a shift towards renewable sources of energy. In Flanders almost half of the existing residential building stock was built before 1970 with low levels of insulation and inefficient installations. The vast majority of Fle...

  8. Rebuilding instead of renovation?; Neubauen statt Sanieren?

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Seiler, B.; Kaufmann, Y. [Econcept AG, Zuerich (Switzerland); Binz, A.; Moosmann, A. [Fachhochschule beider Basel, Muttenz (Switzerland)

    2002-07-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents the results of a study that examined the question of building renewal in Switzerland - should one rebuild or renovate? The report first examines the age-profile of Swiss buildings, defines renewal strategies and ideas, looks at renewal cycles and, in the light of future renewal demands, describes scenarios for replacement with new buildings instead of carrying out total renovations. The housing owners and their methods of management for multiple-apartment housing are described and the various factors involved in making decisions on how to renovate are discussed from the technical, legal and fiscal points of view. The report goes on to examine the ecological and energy aspects of renewal, presenting figures on energy consumption and material flows. Building renewal is also discussed from the social and regional planning points of view. The report is concluded with a discussion on rebuilding or renewal that takes current renewal deficits, costs and social aspects into account and makes recommendations for further action. An appendix presents renewal case studies.

  9. Renovation of a Mechanical Engineering Senior Design Class to an Industry-Tied and Team-Oriented Course

    Science.gov (United States)

    Liu, Yucheng

    2017-01-01

    In this work, an industry-based and team-oriented education model was established based on a traditional mechanical engineering (ME) senior design class in order to better prepare future engineers and leaders so as to meet the increasing demand for high-quality engineering graduates. In the renovated curriculum, industry-sponsored projects became…

  10. [Administration of the "Healthy School" project].

    Science.gov (United States)

    Bjegović, V; Zivković, M; Marinković, J; Vuković, D; Legetić, B

    1996-01-01

    The term of project management is commonly used to describe the work of a team that is handling a special program. In this type of management, a form of leadership which creates environment, enables fast movement of participants through different work phases achieving the common aims, is used [1-4]. The "Healthy School" Project, launched in almost all European countries, has been taking place in Yugoslavia since the end of 1991 [5]. The project developed within the country designed as a health promotion-education intervention study in primary schools. The network of 13 schools on 11 locations representing typical economic, cultural and social environments, was established to cover the country. Although the proposed methodological approach from WHO was followed [6], the specific situation in the country (economic crisis, break down of Yugoslav Federation, the war and international blockade) distated the particular modification. The management of the Healthy School Project in general, and in Yugoslavia particularly, is based upon project management structure (Scheme 1). The objective of this research was to assess the Healthy School project management in Yugoslavia, by measuring causal, intervening and output variables. In the process of assessing the management in general, three groups of criteria are commonly used: (a) causal (those that influence the course of developments in the Project), (b) intervening (representing the current condition of the internal state of the Project), and (c) output (that reflect the Project achievements). (a) For the purpose of this study the causal criteria were measured by analyzing the overall management strategy and the level of agreement in objectives of the Project itself, the Project Coordinators and main participants in the Project. (b) The intervening criteria used in this assessment were: the time spent on different project activities, the estimate of the severity of the problems in different aspects of project management

  11. 40 CFR 745.92 - Fees for the accreditation of renovation and dust sampling technician training and the...

    Science.gov (United States)

    2010-07-01

    ... renovation and dust sampling technician training and the certification of renovation firms. 745.92 Section... Renovation § 745.92 Fees for the accreditation of renovation and dust sampling technician training and the... the following disciplines: Renovator, dust sampling technician. (ii) Exemption. No fee shall be...

  12. The Role of Research in School Project Work and Teacher Development: Results from Project "Schools Ethics Technology."

    Science.gov (United States)

    Wellensiek, Anneliese; Lembens, Anja; Schallies, Michael

    "Schools Ethics Technology" was a German interdisciplinary research project with the Centre of Ethics in the Sciences at the University of Tubingen. The project highlighted the new topic of biotechnology and genetic engineering, involving the formation of active project groups within schools. This study examined teaching activities…

  13. Cost-optimal energy performance renovation measures of educational buildings in cold climate

    International Nuclear Information System (INIS)

    Niemelä, Tuomo; Kosonen, Risto; Jokisalo, Juha

    2016-01-01

    Highlights: • The proposed national nZEB target can be cost-effectively achieved in renovations. • Energy saving potential of HVAC systems is significant compared to the building envelope. • Modern renewable energy production technologies are cost-efficient and recommendable. • Improving the indoor climate conditions in deep renovations is recommendable. • Simulation-based optimization method is efficient in building performance analyzes. - Abstract: The paper discusses cost-efficient energy performance renovation measures for typical educational buildings built in the 1960s and 1970s in cold climate regions. The study analyzes the impact of different energy renovation measures on the energy efficiency and economic viability in a Finnish case study educational building located in Lappeenranta University of Technology (LUT) campus area. The main objective of the study was to determine the cost-optimal energy performance renovation measures to meet the proposed national nearly zero-energy building (nZEB) requirements, which are defined according to the primary energy consumption of buildings. The main research method of the study was simulation-based optimization (SBO) analysis, which was used to determine the cost-optimal renovation solutions. The results of the study indicate that the minimum national energy performance requirement of new educational buildings (E_p_r_i_m_a_r_y ⩽ 170 kWh/(m"2,a)) can be cost-effectively achieved in deep renovations of educational buildings. In addition, the proposed national nZEB-targets are also well achievable, while improving the indoor climate (thermal comfort and indoor air quality) conditions significantly at the same time. Cost-effective solutions included renovation of the original ventilation system, a ground source heat pump system with relatively small dimensioning power output, new energy efficient windows and a relatively large area of PV-panels for solar-based electricity production. The results and

  14. Actual heating energy savings in thermally renovated Dutch dwellings

    International Nuclear Information System (INIS)

    Majcen, Daša; Itard, Laure; Visscher, Henk

    2016-01-01

    The register of the Dutch social housing stock was analysed, containing 300.000 dwellings, renovated between 2010 and 2013. The main objective was twofold: to evaluate the performance gap in these dwellings before and after the renovation and to establish what renovation measures achieve the highest reduction of consumption, particularly in practice (actual savings). The results showed large performance gaps in dwellings with low R and high U values, local heating systems, changes from a non-condensing into a condensing boiler and upgrades to a natural ventilation system. Regarding the actual effectiveness of renovation measures, replacement of old gas boilers with more efficient ones yields the highest energy reduction, followed by deep improvements of windows. Installing mechanical ventilation yields a small reduction compared to other measures, but still much larger than theoretically expected. The paper shows once more that the calculation method currently in use cannot be considered accurate if compared to actual consumption. The study demonstrated that unrealistic theoretical efficiencies of heating systems and insulation values are causing a part of the performance gap. Nowadays, large datasets of buildings thermal performance and actual consumption offer an opportunity to improve these misconceptions. - Highlights: • Performance gap is lower in more efficient buildings. • Replacements of gas boilers – the most energy reduction among renovation measures. • Replacing the ventilation system yields a much larger reduction than expected. • How well are the standard values of the calculation methods defined? • Provide large public building performance databases including actual use data.

  15. 40 CFR 745.90 - Renovator certification and dust sampling technician certification.

    Science.gov (United States)

    2010-07-01

    ... sampling technician certification. 745.90 Section 745.90 Protection of Environment ENVIRONMENTAL PROTECTION... technician certification. (a) Renovator certification and dust sampling technician certification. (1) To become a certified renovator or certified dust sampling technician, an individual must successfully...

  16. The contribution of housing renovation to children’s blood lead levels: a cohort study

    Science.gov (United States)

    2013-01-01

    Background Routine renovation of older housing is a risk factor for childhood lead poisoning, but the contribution to children’s blood lead levels is poorly defined for children with lower exposure levels. Methods We examined a prospective cohort of 276 children followed from 6 to 24 months of age. We conducted surveys of renovation activities and residential lead hazards and obtained blood lead level (B-Pb) every six months. We analyzed B-Pb in a repeated measures design using a mixed effects linear model. Results Parent reported interior renovation ranged from 11 to 25% of housing units at the four, 6-month periods. In multivariable analysis, children whose housing underwent interior renovation had a 12% higher mean B-Pb by two years of age compared with children whose housing units were not renovated (p children in non-renovated housing, children whose housing units underwent renovation in the prior month had a 17% higher mean B-Pb at two years of age, whereas children whose housing renovation occurred in the prior 2–6 months had an 8% higher mean B-Pb. We also found an association between higher paint lead loading, measured using an X-ray fluorescence (XRF) based paint lead index, and child B-Pb (p = 0.02); for every 10 mg/cm2 increase in paint lead loading index there was a 7.5% higher mean childhood B-Pb. Conclusions In an analysis of data collected before the recent changes to Environmental Protection Agency’s Lead, Renovation, Repair and Painting Rule, routine interior housing renovation was associated with a modest increase in children’s B-Pb. These results are important for the provision of clinical advice, for housing and public health professionals, and for policymakers. PMID:23981571

  17. Prerequisites for Successful Strategic Partnerships for Sustainable Building Renovation

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Johansen, Jakob Berg; Thuesen, Christian

    2017-01-01

    The purpose of this paper is to identify the prerequisites for establishing successful strategic partnerships in relation to renovating buildings sustainably. Establishing strategic partnerships is in the paper seen as a potential way to make building renovation more sustainable in Denmark...... industry and analyses of two exemplary cases the paper suggests prerequisites for establishing successful strategic partnerships for sustainable building renovation. The results show that strategic partnerships are collaborations set up between two or more organizations that remain independent...... particularly in terms of reducing energy consumption and use of resources and increase productivity. However, until now we have only had a limited number of such partnerships implemented and the few examples that do exist, mostly concern the construction of new buildings. The paper is based on an investigation...

  18. A District Approach to Building Renovation for the Integral Energy Redevelopment of Existing Residential Areas

    Directory of Open Access Journals (Sweden)

    Mira Conci

    2017-05-01

    Full Text Available Building energy renovation quotas are not currently being met due to unfavorable conditions such as complex building regulations, limited investment incentives, historical preservation priorities, and technical limitations. The traditional strategy has been to incrementally lower the energy consumption of the building stock, instead of raising the efficiency of the energy supply through a broader use of renewable sources. This strategy requires an integral redefinition of the approach to energy building renovations. The joint project SWIVT elaborates on a district redevelopment strategy that combines a reduction in the energy demand of existing buildings and their physical interconnection within a local micro-grid and heating network. The district is equipped with energy generation and distribution technologies as well as hybrid thermal and electrical energy storage systems, steered by an optimizing energy management controller. This strategy is explored through three scenarios designed for an existing residential area in Darmstadt, Germany, and benchmarked against measured data. Presented findings show that a total primary energy balance at least 30% lower than that of a standard building renovation can be achieved by a cluster of buildings with different thermal qualities and connected energy generation, conversion, and storage systems, with only minimal physical intervention to existing buildings.

  19. Energi- og miljøvurdering ved renovering

    DEFF Research Database (Denmark)

    Holleris Petersen, E.

    En afprøvning af pc-værktøjet BEAT 2000's viser, at BEAT 2000 er et velegnet værktøj, der umiddelbart kan anvendes til energi- og miljøvurdering af renoveringssager. BEAT 2000 er afprøvet dels på renovering med energibesparende foranstaltninger i form af solfangere, solvægge og ventilationsanlæg...... med varmegenvinding, dels på mere traditionel renovering af små, utidssvarende lejligheder. En udbygning af datagrundlaget, især for alternative energibesparende løsninger og de materialer, der indgår, vil kunne reducere tidsforbruget ved definition af de utraditionelle og usædvanlige bygningsdele...

  20. The Future School: Designing for Student Success.

    Science.gov (United States)

    Ruck, Gary

    1993-01-01

    Three themes of change in school planning are the future school, outsourcing, and the reconstruction of existing facilities to accommodate technological and philosophical potential. Describes the technology and the house concept at a middle school and renovations at an elementary school. (MLF)

  1. Actions done by SAGARPA to foster renewable energies; Acciones realizadas por la SAGARPA para el fomento de las energias renovables

    Energy Technology Data Exchange (ETDEWEB)

    Diez de Sollano Elcoro, Rodrigo [Fideicomiso de riesgo compartido, Mexico (Mexico)

    2007-06-15

    This presentation is mainly focused on all the projects carried out in order to boost renewable energies. Such projects have not only good results for the environmental sphere but also for the economic one. In the first part, there are found the general targets, which are going to foster the use of these sort of energies. Then, there are shown different kinds of photovoltaic systems. The implementation of these systems have a double target: to improve both activities: stock breeding and agriculture, and to foster the use of renewable energy. Next, there are mentioned the project investors. Similarly, there are described some of the components that are part of such projects along with their corresponding results. Finally, it is given a succinctly explanation about the conclusions as well as the future plans. [Spanish] Esta presentacion principalmente se enfoca en todos los proyectos que se han realizado para el fomento de las energias renovables, teniendo un impacto no solo ambiental sino tambien economico. En la primera parte, se encuentran los objetivos generales que se tienen para fomentar el uso de este tipo de energia. Enseguida, se muestran los diferentes sistemas basados en el uso de energia renovable. La implementacion de estos sistemas tiene un doble objetivo: mejorar de alguna manera la actividad de la ganaderia o de la agricultura, y fomentar el uso de energias renovables. Enseguida, se mencionan los inversionistas que participaron en la realizacion de los proyectos; asimismo, se describen algunos de los elementos, que forman parte de los proyectos, acompanados de sus respectivos resultados obtenidos. Finalmente, se da una breve explicacion de las conclusiones a las que se llegaron, asi como de los planes a futuro.

  2. Generation of components for software renovation factories from context-free grammars

    NARCIS (Netherlands)

    Brand, van den M.G.J.; Sellink, M.P.A.; Verhoef, C.

    2000-01-01

    We present an approach for the generation of components for a software renovation factory. These components are generated from a contex-free grammar definition that recognizes the code that has to be renovated. We generate analysis and transformation components that can be instantiated with a

  3. Funding of Facility Repairs and Renovation.

    Science.gov (United States)

    Kaiser, Harvey H.

    1984-01-01

    Compares the life cycle approach for campus building repair and renovation to the University of California's comprehensive building maintenance formula and advises that formulas be used cautiously as a method of determining appropriate budget levels. (MLF)

  4. Penetration of the renewable sources of energy in Mexico: group of approach on the possible present and future obstacles for the renewable energies (Annexe 11 in 'A vision of year 2030 on the use of the renewable energies in Mexico'); Penetracion de las fuentes renovables de energia en Mexico: grupo de enfoque sobre los posibles obstaculos actuales y futuros para las energias renovables (Anexo 11 en 'Una vision al 2030 de la utilizacion de las energias renovables en Mexico')

    Energy Technology Data Exchange (ETDEWEB)

    Pernudi, Montserrat; Alonso C, Antonio [Analitica Consultores S.A. de C.V., Mexico D.F. (Mexico)

    2005-08-15

    In this study it is analyzed the possible penetration of the renewable sources of energy in Mexico between today and year 2030. In this project are included as small renewable sources the hydroelectric ones (mini, smaller micro and less than of 20 MW), the geothermal, the solar energy, the wind energy and the biomass. This report corresponds to the results obtained in the group of consultation of experts on the present obstacles and future of the renewable energies in Mexico, made o May 24, 2005 in the Mexico City with a small group of approach that presented the objectives of the project, defined the main present obstacles and the possible future evolution for the penetration of the renewable sources of energy in Mexico. [Spanish] En este estudio se analiza la posible penetracion de las fuentes renovables de energia en Mexico entre hoy y el ano 2030. En dicho proyecto se incluyen como fuentes renovables a las pequenas hidroelectricas (micro y mini, menores de 20 MW), la geotermia, la energia solar, la energia eolica y la biomasa. Este informe corresponde a los resultados obtenidos en el grupo de consulta a expertos sobre los obstaculos presentes y futuros de las energias renovables en Mexico, realizado el 24 de mayo de 2005 en la ciudad de Mexico con un pequeno grupo de enfoque que presento los objetivos del proyecto, definio los principales obstaculos actuales y la posible evolucion futura para la penetracion de las fuentes renovables de energia en Mexico.

  5. Business models for full service energy renovation of single-family houses in Nordic countries

    International Nuclear Information System (INIS)

    Mahapatra, Krushna; Gustavsson, Leif; Haavik, Trond; Aabrekk, Synnøve; Svendsen, Svend; Vanhoutteghem, Lies; Paiho, Satu; Ala-Juusela, Mia

    2013-01-01

    Highlights: ► In the Nordic countries there is significant primary energy saving potential in single-family houses from 1970s. ► There are several behavioral, economical and market related hindrances to adoption of energy efficiency measures. ► One-stop-shop business models to offer full service energy renovation packages are slowly emerging. ► Marketing strategies and policy measures are required to promote full service energy renovation of single-family house. - Abstract: In Nordic countries significant primary energy saving potential exists in houses built before 1980. These old houses need to be renovated, which provides an opportunity for implementation of energy efficiency measures. However, there are several economic and market hindrances and the renovation markets are dominated by handicraft-based individual solutions. In this paper we have analyzed the opportunities for implementation of one-stop-shop business models where an overall contractor offers full-service renovation packages including consulting, independent energy audit, renovation work, follow-up (independent quality control and commissioning) and financing. A comparative assessment of emerging business models in the Nordic countries shows that different types of actors can provide such a service. Financing is included in some models. There are differences in how customers are contacted, while the similarities are on how the service is provided. Even though there is strong business potential for one-stop-shop energy renovation concept, still it has been somewhat difficult to start or run such a business. Various options to overcome the hindrances to promote energy efficient renovation of detached houses are discussed

  6. Pedagogic renovation and school organization. Ezequiel Cazaña’s project as base of the general regulation of graded schools of 1918

    Directory of Open Access Journals (Sweden)

    Fernando VICENTE JARA

    2013-11-01

    Full Text Available The beginning of the 20th century in its two first decades corresponds to the phase of birth and childhood of the graduated public school in Spain, entering a process of change of the archaic organizing models of the unitary school by the most modern and rational of the graded school. In those first years Murcia is going to reach an outstanding place, with important people worried about the school matter. And it is in this context where this work is located, with the purpose to present the remarkable contribution of the inspector Ezequiel Cazaña Ruiz to the organization and internal operation of the graded schools, since the contents and forms of teaching, students, personal and school equipment, to the circumscholastic works and classes for adults.

  7. The Use of UAV in Housing Renovation Identification: A Case Study at Taman Manis 2

    Science.gov (United States)

    Mustaffa, A. A.; Hasmori, M. F.; Sarif, A. S.; Ahmad, N. F.; Zainun, N. Y.

    2018-04-01

    Housing industry in Malaysia is growing rapidly due to the increase in population and the arising of economic level of Malaysian people. Most residential houses are built according to the standard residential design that may lead to house renovation by the buyers after purchasing the house. A method of using Unmanned Aerial Vehicle (UAV) monitoring was used to obtain information of the renovated houses directly on-site at Taman Manis 2, Parit Raja, Batu Pahat. Through comparison of image captured by the UAV with the original house plans, we found out that a total of 160 units out of 336 units of houses undergo a renovation process. Surprisingly, 41 units have been renovated illegally which has 40% to 96% of renovation rate. The acquired data were analyzed and can be concluded that the method of using UAVs to obtain information is highly recommended. The study is expected to help Municipal Council to detect improper & illegal renovation by the residents in a residential area.

  8. Sustainable Renovation of Residential Buildings and the Landlord/Tenant Dilemma

    DEFF Research Database (Denmark)

    Ástmarsson, Björn; Jensen, Per Anker; Maslesa, Esmir

    2013-01-01

    solutions can help solve the landlord/tenant dilemma in relation to sustainable renovation of residential buildings, and how the general awareness of sustainable renovation can be increased. Particular focus is on whether tools like energy performance contracting and energy labeling can help solve......The landlord/tenant dilemma arises when the interests of landlords and tenants misalign and is one of the greatest barriers hindering the development of sustainable renovation of residential buildings in Europe. The aim of this research is to investigate how regulatory changes and contractual...... be overcome with a package solution. In the Danish national context the package solution must consist of legislative changes, financial incentives and better dissemination of information. Therefore, an array of different tools must be integrated and used in cooperation to overcome the dilemma....

  9. Today's Schools, Tomorrow's Classrooms.

    Science.gov (United States)

    Nixon, Charles W.

    1998-01-01

    Examines ways to extend the life of middle-aged school buildings when new construction budgets are lacking and renovation funds are scarce. Explains the importance of and provides guidance for making an objective school facility assessment, including assessing the building's purpose, technology requirements, and heating and air conditioning…

  10. Renovation of the sealing planes of WWER-400 reactors pressure vessel

    International Nuclear Information System (INIS)

    Jablonicky, P.; Pilat, P.

    2007-01-01

    An article describes technical solution for renovation of the sealing planes of WWER-440 reactor's pressure vessel. Four nickel sealing rings placed in four concentric grooves are providing hermetic sealing between the vessel and the lid of this type of the reactor. Impeccable seal of the reactor's pressure vessel, where the fission reaction takes place, represents a basic security factor for safe electric energy production. Principle of renovation of the reactor's pressure vessel and lid sealing planes is based on mechanical enlargement of defective grooves and following cladding of the new material by TIG welding. Final step for renovation includes machining of new grooves according to geometrical and surface quality requirements (Authors)

  11. The Chancellor's Model School Project (CMSP)

    Science.gov (United States)

    Lopez, Gil

    1999-01-01

    What does it take to create and implement a 7th to 8th grade middle school program where the great majority of students achieve at high academic levels regardless of their previous elementary school backgrounds? This was the major question that guided the research and development of a 7-year long project effort entitled the Chancellor's Model School Project (CMSP) from September 1991 to August 1998. The CMSP effort conducted largely in two New York City public schools was aimed at creating and testing a prototype 7th and 8th grade model program that was organized and test-implemented in two distinct project phases: Phase I of the CMSP effort was conducted from 1991 to 1995 as a 7th to 8th grade extension of an existing K-6 elementary school, and Phase II was conducted from 1995 to 1998 as a 7th to 8th grade middle school program that became an integral part of a newly established 7-12th grade high school. In Phase I, the CMSP demonstrated that with a highly structured curriculum coupled with strong academic support and increased learning time, students participating in the CMSP were able to develop a strong foundation for rigorous high school coursework within the space of 2 years (at the 7th and 8th grades). Mathematics and Reading test score data during Phase I of the project, clearly indicated that significant academic gains were obtained by almost all students -- at both the high and low ends of the spectrum -- regardless of their previous academic performance in the K-6 elementary school experience. The CMSP effort expanded in Phase II to include a fully operating 7-12 high school model. Achievement gains at the 7th and 8th grade levels in Phase II were tempered by the fact that incoming 7th grade students' academic background at the CMSP High School was significantly lower than students participating in Phase 1. Student performance in Phase II was also affected by the broadening of the CMSP effort from a 7-8th grade program to a fully functioning 7-12 high

  12. Design Standards for School Art Facilities

    Science.gov (United States)

    National Art Education Association, 2015

    2015-01-01

    "Design Standards for School Art Facilities" is an invaluable resource for any school or school district looking to build new facilities for the visual arts or renovate existing ones. Discover detailed information about spaces for the breadth of media used in the visual arts. Photographs illustrate all types of features including…

  13. Hot cell renovation in the spent fuel conditioning process facility at the Korea Atomic Energy Research Institute

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Seung Nam; Lee, Jong Kwang; Park, Byung Suk; Cho, Il Je; Kim, Ki Ho [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    The advanced spent fuel conditioning process facility (ACPF) of the irradiated materials examination facility (IMEF) at the Korea Atomic Energy Research Institute (KAERI) has been renovated to implement a lab scale electrolytic reduction process for pyroprocessing. The interior and exterior structures of the ACPF hot cell have been modified under the current renovation project for the experimentation of the electrolytic reduction process using spent nuclear fuel. The most important aspect of this renovation was the installation of the argon compartment within the hot cell. For the design and system implementation of the argon compartment system, a full-scale mock-up test and a three-dimensional (3D) simulation test were conducted in advance. The remodeling and repairing of the process cell (M8a), the maintenance cell (M8b), the isolation room, and their utilities were also planned through this simulation to accommodate the designed argon compartment system. Based on the considered refurbishment workflow, previous equipment in the M8 cell, including vessels and pipes, were removed and disposed of successfully after a zoning smear survey and decontamination, and new equipment with advanced functions and specifications were installed in the hot cell. Finally, the operating area and isolation room were also refurbished to meet the requirements of the improved hot cell facility.

  14. Safe Routes to School Local School Project: A health evaluation at 10 low-income schools

    OpenAIRE

    Cooper, Jill F MSW; McMillan, Tracy MPH, PHD

    2010-01-01

    fe Routes to School National Partnership (Partnership) founded the Local School Project (Project) in 2008 to assist ten schools in lowincome communities to: 1) develop and evaluate a school-based SRTS program, 2) build local capacity to apply for state or federal SRTS funding, and 3) increase safe walking and bicycling to and from the school and in the community. The Centers for Disease Control and Prevention, Kaiser Permanente, and the Robert Wood Johnson Foundation provided funding for the ...

  15. A Model of Successful School Leadership from the International Successful School Principalship Project

    Directory of Open Access Journals (Sweden)

    David Gurr

    2015-03-01

    Full Text Available The International Successful School Principalship Project (ISSPP has been actively conducting research about the work of successful principals since 2001. Findings from four project books and eight models derived from this project are synthesised into a model of successful school leadership. Building on Gurr, Drysdale and Mulford’s earlier model, the work of school leaders is described as engaging within the school context to influence student and school outcomes through interventions in teaching and learning, school capacity building, and the wider context. The qualities a leader brings to their role, a portfolio approach to using leadership ideas, constructing networks, collaborations and partnerships, and utilising accountability and evaluation for evidence-informed improvement, are important additional elements. The model is applicable to all in leadership roles in schools.

  16. Assessment of Flooring Renovations on African Elephant (Loxodonta africana) Behavior and Glucocorticoid Response

    Science.gov (United States)

    Boyle, Sarah A.; Roberts, Beth; Pope, Brittany M.; Blake, Margaret R.; Leavelle, Stephen E.; Marshall, Jennifer J.; Smith, Andrew; Hadicke, Amanda; Falcone, Josephine F.; Knott, Katrina; Kouba, Andrew J.

    2015-01-01

    Captive African (Loxodonta africana) and Asian (Elephas maximus) elephants can experience foot pathologies and arthritis. As a preventative measure against these pathologies and to alleviate the potential discomfort due to concrete substrates, some zoological institutions have renovated elephant housing to increase the amount of natural or shock-absorbent substrates. The objective of this study was to compare behavioral (diurnal and nocturnal) and glucorticoid (e.g., serum cortisol) responses of three female African elephants before, during, and after renovation to their indoor housing floor to assess whether renovations had short-term effects on the elephants’ behavior and stress physiology. Behavioral data were collected using scan-sampling methods, and activity budgets were constructed for each of the three elephants. In addition, the duration of all lying rest activities were recorded. Weekly serum cortisol concentrations were determined with enzyme immunoassay (EIA). Overall, eating was the most prevalent behavior exhibited outdoors during the day, while resting (either in a lying or standing position) were most common during the indoor, nocturnal periods. Although variation existed among the three elephants, all three females spent significantly more time walking and less time eating during the day after the completion of the renovations. The extent to which the three elephants exhibited nocturnal lying rest behavior varied among the elephants, with the oldest elephant exhibiting the least amount (an average of 13.2 ± 2.8% of the nightly behavioral scans) compared to the two younger elephants (an average of 34.5 ± 2.1% and 56.6 ± 2.8% of the nightly behavioral scans). There was a significant increase in lying rest behavior for one elephant and standing rest for a second elephant following renovations. Baseline cortisol concentrations prior to renovations were 3.0 ± 0.4 ng/ml, 4.5 ± 0.5 ng/ml, and 4.9 ± 0.5 ng/ml for the three elephants. Cortisol

  17. Assessment of Flooring Renovations on African Elephant (Loxodonta africana Behavior and Glucocorticoid Response.

    Directory of Open Access Journals (Sweden)

    Sarah A Boyle

    Full Text Available Captive African (Loxodonta africana and Asian (Elephas maximus elephants can experience foot pathologies and arthritis. As a preventative measure against these pathologies and to alleviate the potential discomfort due to concrete substrates, some zoological institutions have renovated elephant housing to increase the amount of natural or shock-absorbent substrates. The objective of this study was to compare behavioral (diurnal and nocturnal and glucorticoid (e.g., serum cortisol responses of three female African elephants before, during, and after renovation to their indoor housing floor to assess whether renovations had short-term effects on the elephants' behavior and stress physiology. Behavioral data were collected using scan-sampling methods, and activity budgets were constructed for each of the three elephants. In addition, the duration of all lying rest activities were recorded. Weekly serum cortisol concentrations were determined with enzyme immunoassay (EIA. Overall, eating was the most prevalent behavior exhibited outdoors during the day, while resting (either in a lying or standing position were most common during the indoor, nocturnal periods. Although variation existed among the three elephants, all three females spent significantly more time walking and less time eating during the day after the completion of the renovations. The extent to which the three elephants exhibited nocturnal lying rest behavior varied among the elephants, with the oldest elephant exhibiting the least amount (an average of 13.2 ± 2.8% of the nightly behavioral scans compared to the two younger elephants (an average of 34.5 ± 2.1% and 56.6 ± 2.8% of the nightly behavioral scans. There was a significant increase in lying rest behavior for one elephant and standing rest for a second elephant following renovations. Baseline cortisol concentrations prior to renovations were 3.0 ± 0.4 ng/ml, 4.5 ± 0.5 ng/ml, and 4.9 ± 0.5 ng/ml for the three elephants

  18. Restaurant No. 1 fully renovated

    CERN Document Server

    2007-01-01

    The Restaurant No. 1 team. After several months of patience and goodwill on the part of our clients, we are delighted to announce that the major renovation work which began in September 2006 has now been completed. From 21 May 2007 we look forward to welcoming you to a completely renovated restaurant area designed with you in mind. The restaurant team wishes to thank all its clients for their patience and loyalty. Particular attention has been paid in the new design to creating a spacious serving area and providing a wider choice of dishes. The new restaurant area has been designed as an open-plan space to enable you to view all the dishes before making your selection and to move around freely from one food access point to another. It comprises user-friendly areas that fully comply with hygiene standards. From now on you will be able to pick and choose to your heart's content. We invite you to try out wok cooking or some other speciality. Or select a pizza or a plate of pasta with a choice of two sauces fr...

  19. Improved perceived indoor environment in renovated and energy-retrofitted social housing

    DEFF Research Database (Denmark)

    Knudsen, Henrik Nellemose

    2017-01-01

    , noise from outside and too little daylight. The evaluation shows that it is possible to achieve a win-win situation, with both energy savings and improved perceived indoor environment. The evaluation also reveals that careful attention is needed to avoid introducing annoying noise from new technical......The purpose of the present study was, among other things, to evaluate how tenants perceived the indoor environment in renovated and energy-retrofitted social housing erected in the 1960s. Tenants answered a questionnaire to quantify problems and satisfaction with the indoor environment before...... and after the renovation work. A majority of tenants perceived the indoor environment improved for all parameters: temperature, draught, air quality, noise and daylight, after the renovation work. In particular, the tenants experienced fewer problems with too low temperature and draught during the winter...

  20. Gerena School Health Impact Assessment (HIA) Final Report

    Science.gov (United States)

    This is the final report of the EPA-led Gerena Community School HIA, which aims to provide valuable health-focused information to help the City of Springfield narrow down and prioritize renovation actions at the school.

  1. Carmes Polytechnique, Housing in the Heart of Paris Energy renovation of a social housing estate in Paris

    Directory of Open Access Journals (Sweden)

    Christian Horn

    2017-12-01

    Full Text Available The architecture offices Atelier de la Seine and Rethink have been commissioned with the engineers Pouget Consultants by the social landlord Paris Habitat for the extensive renovation of a social housing estate in the historic centre of Paris. The estate has been built in 1930 and integrates a part of the former college of the Lombard build in the 17th century. It belongs to the social housing typology 'Habitations à Bon Marché (HBM' constructed between1894 and 1949. This typology is generally characterized by its integration in its urban context and an apparent brick facade. The renovation project includes a focus on the reduction of the energy consumption. An important subject, as of the total number of 4.6 millions of social housing in France more than 50 % have been build before 1975 (before the first thermal regulation and many are still considered energy-intensive.

  2. The Use of Reference Models in Business Process Renovation

    Directory of Open Access Journals (Sweden)

    Dejan Pajk

    2010-01-01

    Full Text Available Enterprise resource planning (ERP systems are often used by companies to automate and enhance their busi- ness processes. The capabilities of ERP systems can be described by best-practice reference models. The purpose of the article is to demonstrate the business process renovation approach with the use of reference models. Although the use of reference models brings many positive effects for business, they are still rarely used in Slovenian small and medium-sized compa- nies. The reasons for this may be found in the reference models themselves as well as in project implementation methodologies. In the article a reference model based on Microsoft Dynamics NAV is suggested. The reference model is designed using upgraded BPMN notation with additional business objects, which help to describe the models in more detail.

  3. Multi-angled Façade System for Office Building Renovation

    DEFF Research Database (Denmark)

    Hannoudi, Loay Akram; Christensen, Jørgen Erik; Lauring, Michael

    renovating office buildings. The architectural potential is presented with the help of AutoCAD software. The energy efficiency and indoor climate are investigated and evaluated by using correlational research and simulation research methods with the software IDA ICE. From a functional perspective, the multi......-angled façade increases the area of the office room and provides more space. There are many potential aesthetic benefits provided by multi-angled façades such as improved optical and visual quality from inside the office room and the possibility for daylight penetration and a view to outside from one part...... compared to a renovated flat façade varies between 4.9 and 6.5 kWh/(m2.year), depending on the orientation of the façade. The increase in the office room area, when renovated with a multi-angled façade, is by 19%, while the increase of the yearly primary energy consumption (not area weighted), is by 4...

  4. ECO-TECHNIQUE OF SEWER RENOVATION USING COMPOSITE ...

    African Journals Online (AJOL)

    2011-12-31

    Dec 31, 2011 ... An eco-technical renovation of the sewage system is developed in this paper; this ... structural analysis of a typical shell unit with an ovoid form .... described by five fundamental equations, can be reduced to three equations.

  5. The Fulton School Recycling Project.

    Science.gov (United States)

    Lindsay, Jean

    1994-01-01

    Outlines a school recycling project that started as a newspaper collection for library funds and evolved into a community service. Discusses problems that were overcome, strategies for implementation of the project, and related cross-curricular studies and activities. Contains two curriculum mind maps. (LZ)

  6. Gordailu and pedagogic renovation in the Basque Country. Politics and education during the late francoism

    Directory of Open Access Journals (Sweden)

    Ander DELGADO CENDAGORTAGALARZA

    2017-12-01

    Full Text Available This article analyses the educative and pedagogical renovation proposals situated in their social and economic context. Thus, it intends to obtain a wider vision of the problems or helps these proposals may have when it comes to their application in schools. It will be of major consideration to differentiate within these proposals the aspects related with classroom management from other approaches related with the goals to transform the society through a reformed education, that sometimes appear inside them, to understand better their social reception. This article is centred on the research of proposals based on the ideas Paulo Freire tried to introduce in the ikastola or Basque schools in the seventies of the last Century in the Basque Country and the problems they found when their application was intended.

  7. A Study of the Relationship Between School Leadership and the Condition of School Buildings

    OpenAIRE

    Brannon, William Lee

    2000-01-01

    The purpose of this study was to examine the relationship between school leadership and the quality, condition, maintenance, improvements, and renovations of public school buildings. The first question examined the relationship between building conditions and perceptions of school board members, superintendent and central office staff, board of supervisors, and principals. The second question examined the relationship between building conditions and the financial support of leadership positio...

  8. Increasing Epilepsy Awareness in Schools: A Seizure Smart Schools Project

    Science.gov (United States)

    Brook, Heather A.; Hiltz, Cynthia M.; Kopplin, Vicki L.; Lindeke, Linda L.

    2015-01-01

    A high prevalence of epilepsy diagnoses and seizure events among students was identified at a large Midwestern school district. In partnership with the Epilepsy Foundation of Minnesota (EFMN), a quality improvement project was conducted to provide education and resources to staff caring for school children with seizures. School nurses (N = 26)…

  9. High-rise build renovation - Colouring a high-rise building's facade; Renovation des Hochhauses Schoppi Spreitenbach. Farbigkeit einer Hochhausfassade

    Energy Technology Data Exchange (ETDEWEB)

    Enkerli, W.

    2008-07-01

    This illustrated article takes a look at the renovation of the 70-metres high, high-rise apartment building that forms an integral part of a large shopping centre in Spreitenbach, Switzerland. The buildings and their infrastructure, realised in 1970, were in need of renovation. The facade elements no longer met energy requirements and the shopping mall was to be extended to meet modern shopping needs. The article deals with the technical and aesthetic requirements placed on the facades. The colour concept for the venetian blinds integrated into the windows, which includes the use of 20 different shades of colour, is described. A total of 3,200 blinds are fitted. The removal of the old window elements and the fitting of the new facade elements is described and discussed.

  10. Business models for full service energy renovation of single-family houses in Nordic countries

    DEFF Research Database (Denmark)

    Mahapatra, Krushna; Gustavsson, Leif; Haavik, Trond

    2013-01-01

    the similarities are on how the service is provided. Even though there is strong business potential for one-stop-shop energy renovation concept, still it has been somewhat difficult to start or run such a business. Various options to overcome the hindrances to promote energy efficient renovation of detached houses...... markets are dominated by handicraft-based individual solutions. In this paper we have analyzed the opportunities for implementation of one-stop-shop business models where an overall contractor offers full-service renovation packages including consulting, independent energy audit, renovation work, follow......-up (independent quality control and commissioning) and financing. A comparative assessment of emerging business models in the Nordic countries shows that different types of actors can provide such a service. Financing is included in some models. There are differences in how customers are contacted, while...

  11. Supply-side collaboration for energy-efficient renovations

    NARCIS (Netherlands)

    Straub, A.; Mlecnik, E.

    2015-01-01

    The supply side for nearly zero energy building (nZEB) renovation of owner-occupied single-family houses in Europe is suffering from a severe image problem of lack of knowledge and trust, inefficient construction processes, insufficient quality assurance and communication difficulties with

  12. Effect of energy renovation on indoor air quality in multifamily residential buildings in Slovakia

    DEFF Research Database (Denmark)

    Földváry, Veronika; Bekö, Gabriel; Langer, Sarka

    2017-01-01

    efficiency of these buildings rarely consider their impact on the indoor air quality (IAQ). The objective of the present study was to evaluate the impact of simple energy renovation on IAQ, air exchange rates (AER) and occupant satisfaction in Slovak residential buildings. Three pairs of identical naturally...... of nitrogen dioxide (NO2), formaldehyde and total and individual volatile organic compounds (VOC) were also measured. CO2 concentrations were significantly higher and AERs were lower in the renovated buildings. Formaldehyde concentrations increased after renovation and were positively correlated with CO2...

  13. [Outcomes evaluation of the school staff health promotion project].

    Science.gov (United States)

    Woynarowska-Sołdan, Magdalena

    This article presents selected outcomes of a 3-year project "Health promotion of school staff in health-promoting schools," as well as the achievements and difficulties in its implementation. The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62-93%) and the physical and social environment of the school (50-92%). Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2):187-200. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  14. Outcomes evaluation of the school staff health promotion project

    Directory of Open Access Journals (Sweden)

    Magdalena Woynarowska-Sołdan

    2016-04-01

    Full Text Available Background: This article presents selected outcomes of a 3-year project “Health promotion of school staff in health-promoting schools,” as well as the achievements and difficulties in its implementation. Material and Methods: The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Results: Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62–93% and the physical and social environment of the school (50–92%. Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. Conclusions: The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2:187–200

  15. Conceptual design report: Nuclear materials storage facility renovation. Part 5, Structural/seismic investigation. Section B, Renovation calculations/supporting data

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL's weapons research, development, and testing (WRD ampersand T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL's inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This report is organized according to the sections and subsections. It is organized into seven parts. This document, Part V, Section B - Structural/Seismic Information provides a description of the seismic and structural analyses performed on the NMSF and their results

  16. Renovation of the CERN Computer Centre

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The Computer Centre at CERN is seen after half of the equipment is the large ground floor room has been removed. A large-scale spring-cleaning operation took place before renovation work for the new CERN Grid system began. Fifteen kilometres of cables that were no longer needed were removed from the cavity floor for recycling.

  17. Renewable energy and technological development; Energia renovable y desarrollo tecnologico

    Energy Technology Data Exchange (ETDEWEB)

    Covarrubias Ramos, Rogelio [Fideicomiso para el ahorro de energia, (Mexico)

    2007-06-15

    In this presentation is widely described the work carried out by the Trust Fund for Electrical Energy Savings (FIDE) with reference to renewable energy foster. In the first part, it is found the FIDE's mission, which is focused on achieving the efficient use of the energy. Then, there are quiet briefly described the processes -carried out by the FIDE- in favour of the groundbreaking technology that achieves to decrease the energy squandering. In addition, there are mentioned different means boosting the energy savings. Then, there are described the issues the energy system should change in order to improve the actual situation of many Mexicans. There are briefly mentioned not only the environmental but also the social benefits of the use of renewable energy; besides, there are given the necessary elements in order to make it possible. Then, there are explained why the use of renewable energy would be profitable. Finally, it is described the methodology that should be followed in case it is wanted to find sponsors up to 100% for a project related to improvement of the energy production. [Spanish] Esta presentacion describe ampliamente la labor que realiza el Fideicomiso para el ahorro de energia (FIDE) en relacion con el fomento de la energia renovable, asi como el desarrollo de tecnologias que refuercen el uso de este tipo de energia. En la primera parte, se encuentra la mision del FIDE, que se enfoca en lograr que el uso de la energia sea apropiado. Enseguida, de forma breve se describen los procesos que realiza el FIDE en favor de la tecnologia innovadora que haga decrecer el dispendio de energia. Luego, se explican las aspectos endebles del sistema energetico de Mexico. Se describen escuetamente los beneficios, no solo ambientales sino tambien sociales, del uso de energia renovable; ademas, se mencionan los elementos necesarios para que esto pueda lograrse. Mas adelante, se dan las razones por las que para Mexico seria rentable el uso de energia renovable

  18. Renewable energy and technological development; Energia renovable y desarrollo tecnologico

    Energy Technology Data Exchange (ETDEWEB)

    Covarrubias Ramos, Rogelio [Fideicomiso para el ahorro de energia, (Mexico)

    2007-06-15

    In this presentation is widely described the work carried out by the Trust Fund for Electrical Energy Savings (FIDE) with reference to renewable energy foster. In the first part, it is found the FIDE's mission, which is focused on achieving the efficient use of the energy. Then, there are quiet briefly described the processes -carried out by the FIDE- in favour of the groundbreaking technology that achieves to decrease the energy squandering. In addition, there are mentioned different means boosting the energy savings. Then, there are described the issues the energy system should change in order to improve the actual situation of many Mexicans. There are briefly mentioned not only the environmental but also the social benefits of the use of renewable energy; besides, there are given the necessary elements in order to make it possible. Then, there are explained why the use of renewable energy would be profitable. Finally, it is described the methodology that should be followed in case it is wanted to find sponsors up to 100% for a project related to improvement of the energy production. [Spanish] Esta presentacion describe ampliamente la labor que realiza el Fideicomiso para el ahorro de energia (FIDE) en relacion con el fomento de la energia renovable, asi como el desarrollo de tecnologias que refuercen el uso de este tipo de energia. En la primera parte, se encuentra la mision del FIDE, que se enfoca en lograr que el uso de la energia sea apropiado. Enseguida, de forma breve se describen los procesos que realiza el FIDE en favor de la tecnologia innovadora que haga decrecer el dispendio de energia. Luego, se explican las aspectos endebles del sistema energetico de Mexico. Se describen escuetamente los beneficios, no solo ambientales sino tambien sociales, del uso de energia renovable; ademas, se mencionan los elementos necesarios para que esto pueda lograrse. Mas adelante, se dan las razones por las que para Mexico seria rentable el uso de energia renovable

  19. Method for planning extensive energy renovation of detached single-family houses

    DEFF Research Database (Denmark)

    Grøn Bjørneboe, Matilde

    , and 22% occurs in single-family houses, making this the largest single contributor to the total consumption after road transport (DEA, 2015a). There is a large potential for achieving energy savings in this sector, especially among the large number of single-family houses built in the 1960s and 1970s...... that the use of this approach produced a better renovation with a larger energy saving. The initial evaluation helped the house owners identify a maintenance backlog, and the use of an independent advisor helped ensure quality throughout the process. Renovations are too often carried out for just one purpose......: maintenance, to update functions or to reduce energy consumption. But a lot can be gained by combining these efforts, which can reduce expenses for planning and execution and avoid doing things twice. Research for this thesis demonstrated this approach by carrying out a renovation based on maintenance...

  20. Manufacturing technology education development project. Project accomplishment summary for 91-Y12P-050-A1

    Energy Technology Data Exchange (ETDEWEB)

    Douglass, S. [Lockheed Martin Energy Systems, Inc., Oak Ridge, TN (United States); Smith, R. [Tennessee Dept. of Education, Nashville, TN (United States)

    1996-09-25

    The purpose of the project was to provide a set of supplemental instructional equipment and materials to Tennessee high school students to raise their level of knowledge about manufacturing technologies with the hope that some of the best and brightest would choose manufacturing as a career path. The role of the Y-12 Plant was primarily technical: renovate the portable classroom; select and purchase appropriate equipment; install and test the equipment; assist in the development of the curriculum; train the initial group of teachers; and provide technical assistance where needed after the laboratory was deployed. The role of the Department of Education was to provide the mobile facility; assist in the design of the laboratory; lead the development of the curriculum; deploy the trailer; and develop the structure for administering the selection of schools, training teachers, and movement of the laboratory. The Department of Education as subcontracted with Middle Tennessee State University to handle the details of laboratory deployment.

  1. Training readers at school: the educational project, the school library and the mediation

    Directory of Open Access Journals (Sweden)

    Rovilson José da Silva

    2015-09-01

    Full Text Available Introduction: Discusses the formation of readers in the first years of elementary school and proposes the integration between the school pedagogical project, teachers, reading practices and the school library. Objective: To analyze the basic assumptions to train readers in school. Methods: Bibliographic research based on a literature review on the subject. Results: Initial elements that may be used to structure readers-training projects at any schools are presented. Conclusion: Training readers at school consists in having procedures and pedagogical actions performed in combination with guided and free usage of the library, borrowing books and time to hear stories and talk about them.

  2. Schools water efficiency and awareness project

    African Journals Online (AJOL)

    driniev

    2002-04-23

    Apr 23, 2002 ... Schools Water Efficiency Project in February 2003, which supports several of the City's Water Demand ... of automatic flushing urinals (AFUs) alone in schools can save up .... to go back into the bag as the cistern is filling.

  3. When Money Matters: School Infrastructure Funding and Student Achievement

    Science.gov (United States)

    Crampton, Faith E.; Thompson, David C.

    2011-01-01

    Today's school business officials are more aware than ever of the importance of making every dollar count. As they scour their budgets for possible savings, they may be tempted to reduce investment in school infrastructure, perhaps by deferring maintenance, renovations, and replacement of outdated facilities. However, school business officials…

  4. Sustainable renovation concepts for single-family houses

    DEFF Research Database (Denmark)

    Vanhoutteghem, Lies; Tommerup, Henrik M.; Svendsen, Svend

    , the financial possibilities of the homeowner etc. Calculation of packages of energy efficient renovation solutions targeted the three segments of houses show that primary energy use and heating bill can be reduced with up to about 75% or a factor 4 corresponding to the level of a new house or better. It seems...... that the passive house level can not quite be reached with standard solutions. They require that more ambitious measures are applied. The total investment needed to reduce the heating bill by a factor 4 including replacement of e.g. roof and windows is up to EUR 100,000. It is generally difficult to obtain...... be seen as a possibility to make it easy for the homeowner to comply with possible future requirements to realize far-reaching energy savings in connection with extensive renovations, provided that the building sector offers the solutions. Homeowners need someone to take care of all relevant steps...

  5. Extensions and renovations of reactor protection systems

    International Nuclear Information System (INIS)

    Hellmerichs, K.

    1985-01-01

    Increase of requirements by the authorities as to the design of reactor protection systems affected in the last years not only plans being under construction, but also resulted in partly spacious extensions and renovations. While working on the extensions and renovations a lot of problems arose: far-reaching performance of newest guidelines and rules in spite of old plant concepts; partly higher degree of redundancy requirements of the new systems in contrast to the present systems; use of present safeguard systems for new accident countermeasures; designation of priorities between present and new functions, especially in view of fault behaviour of present systems; adaptation of the new I and C equipment to the present signalisation-, operation- and information-arrangements under consideration of the present operational philosophy; spatial incorporation of new equipments; construction as to time without expanding of the planned refuelling phases. Because the KWU has planned and constructed such alterations in nearly 10 plants a lot of experience has been gathered. (author)

  6. PCB i bygninger - afhjælpning, renovering og nedrivning

    DEFF Research Database (Denmark)

    Andersen, Helle Vibeke

    SBi-anvisning 268 beskriver, hvordan PCB-forurening af indeluften afhjælpes, og hvordan PCB håndteres, når man renoverer eller nedriver bygninger med PCB. Uanset om der er tale om afhjælpning, renovering eller nedrivning, kan arbejdet generere PCB-holdigt affald. Anvisningen forklarer derfor......, hvordan affaldet skal håndteres, og hvordan man beskytter mennesker og miljø under arbejdet. Anvisningen er baseret på byggebranchens erfaringer og den aktuelle forskningsbaserede viden om PCB i bygninger. SBi-anvisning 268 afløser den snart fire år gamle SBi-anvisning 242 om renovering af bygninger med...... PCB, som ikke behandlede spørgsmålet om affaldshåndtering....

  7. Environmental issues associated with R Reactor renovation and startup

    International Nuclear Information System (INIS)

    Marter, W.L.

    1982-01-01

    This memorandum identifies the more significant environmental issues that would be associated with renovation and startup of R Reactor to meet future demands for nuclear weapon materials. Some key environmental issues identified are: potential occupational radiation exposures associated with repairing the leaks in the reactor nozzles and thermal shield tanks and with renovating the disassembly basin facilities; the impacts of constructing additional cooling water pumping capacity; the effect of increased pumping on impingement and entrainment at the pump houses; thermal effects on the R Canal-precooler pond-Par Pond ecosystem from increased discharge of cooling water; and effects of increased water flow in Lower Three Runs Creek on biota and on cesium-137 remobilization

  8. Energy Design Guidelines for High Performance Schools: Tropical Island Climates

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-11-01

    Design guidelines outline high performance principles for the new or retrofit design of K-12 schools in tropical island climates. By incorporating energy improvements into construction or renovation plans, schools can reduce energy consumption and costs.

  9. Project Chrysalis: The Evolution of a Community School.

    Science.gov (United States)

    Garrett, K.

    1996-01-01

    Describes the creation and operation of Project Chrysalis, a community, service-learning school transformed from row houses, where children can learn, work, and gain inspiration from artists and social entrepreneurs involved with Houston's Project Row Houses. Personal narratives of two teachers highlight the school's and students' accomplishments…

  10. The renovated Almaraz is profitable

    International Nuclear Information System (INIS)

    Vehkanen, S.; Vaelisuo, M.

    2001-01-01

    The Almaraz power plant is situated in the Province of Extremadura in southwestern Spain. In the plant there are two pressurised water reactors that are delivered by Westinghouse and commissioned in the beginning of 1980's. In mid 1990's major renovations were made by Siemens. The plant is very profitable, says plant manager Araluce. The richness of the living nature in the area surrounding the power plant was emphasized in the oral and written presentations. (author)

  11. Renovation work at Restaurant 1

    CERN Multimedia

    2006-01-01

    Due to the age of the present kitchen and freeflow installations in Restaurant 1, essential renovation work is due to be carried out. The work is scheduled to last from September 2006 to May 2007. Work on the self-service area of the restaurant will commence in November. Every effort will be made to minimise the inconvenience caused to users of the restaurant and we thank you in advance for your co-operation during this period.

  12. Shanghai-School Theater

    Institute of Scientific and Technical Information of China (English)

    1993-01-01

    SHANGHAl-SCHOOL Thea-ter has played an importantrole in modern Chinese cul-tural history.At the turn of the 20thcentury,when there were great so-cial changes.Chinese traditionaltheater extended itself to take inWestern cultural elements,causingchanges and developments in thestructure and form of traditionalChinese theater.Because this newtype.of theater started in shang-hai,it was named Shanghai-SchoolTheater.The fundaments of thetheatrical school emphasized the opening,integration and renovation of theatrlcal art.It actually tried tomodermize the traditional Chinesetheater.

  13. Development of energy renovation packages for Danish residential single family houses - parcel houses

    DEFF Research Database (Denmark)

    Pomianowski, Michal Zbigniew; Antonov, Yovko Ivanov; Heiselberg, Per Kvols

    Work presented in this technical report was developed as a port of Horizon 2020 EU project REFURB. The number of deep energy retrofits is falling behind the EU ambitious targets. The REFURB project aims at finding technical and nontechnical solutions that would match demand and supply side......-selected homeowner target groups was based on (I) selection of dwelling segment with high impact and energy saving potential. (II)Sequenced approach in creating package solutions. (III)Compelling offer to be proposed with specific timing. This report focuses mainly on the second listed component, namely, development...... of the residential building renovation market. Due to the multiple significant differences at the national level, compelling offers were developed specifically for each country participant. This report elaborates only on Danish approach, as stated in [1], the Danish approach to create compelling offers for pre...

  14. Replacement vs. Renovation: The Reincarnation of Hubble Middle School

    Science.gov (United States)

    Ogurek, Douglas J.

    2010-01-01

    At the original Hubble Middle School, neither the views (a congested Roosevelt Road and glimpses of downtown Wheaton) nor the century-old facility that offered them was very inspiring. Built at the start of the 20th century, the 250,000-square-foot building was converted from Wheaton Central High School to Hubble Middle School in the early 1980s.…

  15. Indoor air quality in green-renovated vs. non-green low-income homes of children living in a temperate region of US (Ohio)

    Energy Technology Data Exchange (ETDEWEB)

    Coombs, Kanistha C. [University of Cincinnati, Department of Environmental Health, P.O. Box 670056, Cincinnati, OH (United States); Chew, Ginger L. [Centers for Disease Control and Prevention (CDC), National Center for Environmental Health, Air Pollution and Respiratory Health Branch, 4770 Buford Hwy., N.E., MS-F60, Atlanta, GA (United States); Schaffer, Christopher [University of Cincinnati, Department of Environmental Health, P.O. Box 670056, Cincinnati, OH (United States); Ryan, Patrick H. [University of Cincinnati, Department of Environmental Health, P.O. Box 670056, Cincinnati, OH (United States); Department of Pediatrics, Cincinnati Children' s Hospital Medical Center, 3333 Burnet Ave, Cincinnati, OH (United States); Brokamp, Cole; Grinshpun, Sergey A. [University of Cincinnati, Department of Environmental Health, P.O. Box 670056, Cincinnati, OH (United States); Adamkiewicz, Gary [Harvard University, T.H. Chan School of Public Health, Department of Environmental Health, 401 Park Drive, Boston, MA (United States); Chillrud, Steve [Columbia University, Lamont-Doherty Earth Observatory, Geochemistry Division, P.O. Box 8000, Palisades, New York (United States); Hedman, Curtis [University of Wisconsin-Madison, Wisconsin State Laboratory of Hygiene, 465 Henry Mall, Madison, WI (United States); Colton, Meryl [Harvard University, T.H. Chan School of Public Health, Department of Environmental Health, 401 Park Drive, Boston, MA (United States); Ross, Jamie [Columbia University, Lamont-Doherty Earth Observatory, Geochemistry Division, P.O. Box 8000, Palisades, New York (United States); Reponen, Tiina [University of Cincinnati, Department of Environmental Health, P.O. Box 670056, Cincinnati, OH (United States)

    2016-06-01

    Green eco-friendly housing includes approaches to reduce indoor air pollutant sources and to increase energy efficiency. Although sealing/tightening buildings can save energy and reduce the penetration of outdoor pollutants, an adverse outcome can be increased buildup of pollutants with indoor sources. The objective of this study was to determine the differences in the indoor air quality (IAQ) between green and non-green homes in low-income housing complexes. In one housing complex, apartments were renovated using green principles (n = 28). Home visits were conducted immediately after the renovation, and subsequently at 6 months and at 12 months following the renovation. Of these homes, eight homes had pre-renovation home visits; this allowed pre- and post-renovation comparisons within the same homes. Parallel visits were conducted in non-green (control) apartments (n = 14) in a nearby low-income housing complex. The IAQ assessments included PM{sub 2.5}, black carbon, ultrafine particles, sulfur, total volatile organic compounds (VOCs), formaldehyde, and air exchange rate. Data were analyzed using linear mixed-effects models. None of the indoor pollutant concentrations were significantly different between green and non-green homes. However, we found differences when comparing the concentrations before and after renovation. Measured immediately after renovation, indoor black carbon concentrations were significantly lower averaging 682 ng/m{sup 3} in post-renovation vs. 2364 ng/m{sup 3} in pre-renovation home visits (p = 0.01). In contrast, formaldehyde concentrations were significantly higher in post-renovated (0.03 ppm) than in pre-renovated homes (0.01 ppm) (p = 0.004). Questionnaire data showed that opening of windows occurred less frequently in homes immediately post-renovation compared to pre-renovation; this factor likely affected the levels of indoor black carbon (from outdoor sources) and formaldehyde (from indoor sources) more than the renovation status

  16. Indoor air quality in green-renovated vs. non-green low-income homes of children living in a temperate region of US (Ohio)

    International Nuclear Information System (INIS)

    Coombs, Kanistha C.; Chew, Ginger L.; Schaffer, Christopher; Ryan, Patrick H.; Brokamp, Cole; Grinshpun, Sergey A.; Adamkiewicz, Gary; Chillrud, Steve; Hedman, Curtis; Colton, Meryl; Ross, Jamie; Reponen, Tiina

    2016-01-01

    Green eco-friendly housing includes approaches to reduce indoor air pollutant sources and to increase energy efficiency. Although sealing/tightening buildings can save energy and reduce the penetration of outdoor pollutants, an adverse outcome can be increased buildup of pollutants with indoor sources. The objective of this study was to determine the differences in the indoor air quality (IAQ) between green and non-green homes in low-income housing complexes. In one housing complex, apartments were renovated using green principles (n = 28). Home visits were conducted immediately after the renovation, and subsequently at 6 months and at 12 months following the renovation. Of these homes, eight homes had pre-renovation home visits; this allowed pre- and post-renovation comparisons within the same homes. Parallel visits were conducted in non-green (control) apartments (n = 14) in a nearby low-income housing complex. The IAQ assessments included PM_2_._5, black carbon, ultrafine particles, sulfur, total volatile organic compounds (VOCs), formaldehyde, and air exchange rate. Data were analyzed using linear mixed-effects models. None of the indoor pollutant concentrations were significantly different between green and non-green homes. However, we found differences when comparing the concentrations before and after renovation. Measured immediately after renovation, indoor black carbon concentrations were significantly lower averaging 682 ng/m"3 in post-renovation vs. 2364 ng/m"3 in pre-renovation home visits (p = 0.01). In contrast, formaldehyde concentrations were significantly higher in post-renovated (0.03 ppm) than in pre-renovated homes (0.01 ppm) (p = 0.004). Questionnaire data showed that opening of windows occurred less frequently in homes immediately post-renovation compared to pre-renovation; this factor likely affected the levels of indoor black carbon (from outdoor sources) and formaldehyde (from indoor sources) more than the renovation status itself. To

  17. An integrated urban drainage system model for assessing renovation scheme.

    Science.gov (United States)

    Dong, X; Zeng, S; Chen, J; Zhao, D

    2012-01-01

    Due to sustained economic growth in China over the last three decades, urbanization has been on a rapidly expanding track. In recent years, regional industrial relocations were also accelerated across the country from the east coast to the west inland. These changes have led to a large-scale redesign of urban infrastructures, including the drainage system. To help the reconstructed infrastructures towards a better sustainability, a tool is required for assessing the efficiency and environmental performance of different renovation schemes. This paper developed an integrated dynamic modeling tool, which consisted of three models for describing the sewer, the wastewater treatment plant (WWTP) and the receiving water body respectively. Three auxiliary modules were also incorporated to conceptualize the model, calibrate the simulations, and analyze the results. The developed integrated modeling tool was applied to a case study in Shenzhen City, which is one of the most dynamic cities and facing considerable challenges for environmental degradation. The renovation scheme proposed to improve the environmental performance of Shenzhen City's urban drainage system was modeled and evaluated. The simulation results supplied some suggestions for the further improvement of the renovation scheme.

  18. A escola entre a agonia moral e a renovação ética School: between morality crisis and ethical renovation

    Directory of Open Access Journals (Sweden)

    Anne Barrere

    2001-10-01

    Full Text Available Enquanto a sociedade assiste a uma ruptura entre considerações éticas e princípios estritamente morais, a escola custa para reconhecer a importância da preocupação ética. Em meio a uma crise da educação moral, não consegue legitimar reflexões que, entretanto, fazem parte do cotidiano de alunos e docentes. O presente artigo propõe-se a analisar essa situação, assim como os possíveis esboços de uma renovação da ética na escola, mediante três grandes dimensões: a relação consigo, a relação com o Outro, a relação com a sociedade.In modern society, ethical matters tend to stray from moral principles. Yet school, immersed in a moral education crisis, hardly legitimates or even acknowledges ethical issues that are part of teachers and pupils' everyday life. This paper seeks to analyze such a situation and possible outlines for an ethical renovation, along three main sets of problems: relationship to oneself, relationship to the Others, relationship to society.

  19. Optimal Decision Model for Sustainable Hospital Building Renovation—A Case Study of a Vacant School Building Converting into a Community Public Hospital

    Science.gov (United States)

    Juan, Yi-Kai; Cheng, Yu-Ching; Perng, Yeng-Horng; Castro-Lacouture, Daniel

    2016-01-01

    Much attention has been paid to hospitals environments since modern pandemics have emerged. The building sector is considered to be the largest world energy consumer, so many global organizations are attempting to create a sustainable environment in building construction by reducing energy consumption. Therefore, maintaining high standards of hygiene while reducing energy consumption has become a major task for hospitals. This study develops a decision model based on genetic algorithms and A* graph search algorithms to evaluate existing hospital environmental conditions and to recommend an optimal scheme of sustainable renovation strategies, considering trade-offs among minimal renovation cost, maximum quality improvement, and low environmental impact. Reusing vacant buildings is a global and sustainable trend. In Taiwan, for example, more and more school space will be unoccupied due to a rapidly declining birth rate. Integrating medical care with local community elder-care efforts becomes important because of the aging population. This research introduces a model that converts a simulated vacant school building into a community public hospital renovation project in order to validate the solutions made by hospital managers and suggested by the system. The result reveals that the system performs well and its solutions are more successful than the actions undertaken by decision-makers. This system can improve traditional hospital building condition assessment while making it more effective and efficient. PMID:27347986

  20. Indoor air quality in green-renovated vs. non-green low-income homes of children living in a temperate region of US (Ohio).

    Science.gov (United States)

    Coombs, Kanistha C; Chew, Ginger L; Schaffer, Christopher; Ryan, Patrick H; Brokamp, Cole; Grinshpun, Sergey A; Adamkiewicz, Gary; Chillrud, Steve; Hedman, Curtis; Colton, Meryl; Ross, Jamie; Reponen, Tiina

    2016-06-01

    Green eco-friendly housing includes approaches to reduce indoor air pollutant sources and to increase energy efficiency. Although sealing/tightening buildings can save energy and reduce the penetration of outdoor pollutants, an adverse outcome can be increased buildup of pollutants with indoor sources. The objective of this study was to determine the differences in the indoor air quality (IAQ) between green and non-green homes in low-income housing complexes. In one housing complex, apartments were renovated using green principles (n=28). Home visits were conducted immediately after the renovation, and subsequently at 6 months and at 12 months following the renovation. Of these homes, eight homes had pre-renovation home visits; this allowed pre- and post-renovation comparisons within the same homes. Parallel visits were conducted in non-green (control) apartments (n=14) in a nearby low-income housing complex. The IAQ assessments included PM2.5, black carbon, ultrafine particles, sulfur, total volatile organic compounds (VOCs), formaldehyde, and air exchange rate. Data were analyzed using linear mixed-effects models. None of the indoor pollutant concentrations were significantly different between green and non-green homes. However, we found differences when comparing the concentrations before and after renovation. Measured immediately after renovation, indoor black carbon concentrations were significantly lower averaging 682 ng/m(3) in post-renovation vs. 2364 ng/m(3) in pre-renovation home visits (p=0.01). In contrast, formaldehyde concentrations were significantly higher in post-renovated (0.03 ppm) than in pre-renovated homes (0.01 ppm) (p=0.004). Questionnaire data showed that opening of windows occurred less frequently in homes immediately post-renovation compared to pre-renovation; this factor likely affected the levels of indoor black carbon (from outdoor sources) and formaldehyde (from indoor sources) more than the renovation status itself. To reduce IAQ

  1. Elementary and middle school science improvement project

    Science.gov (United States)

    Mcguire, Saundra Y.

    1989-01-01

    The Alabama A and M University Elementary and Middle School Science Improvement Project (Project SIP) was instituted to improve the science knowledge of elementary and middle school teachers using the experimental or hands-on approach. Summer workshops were conducted during the summers of 1986, 1987, and 1988 in the areas of biology, chemistry, physics, and electricity, and magnetism. Additionally, a manual containing 43 lessons which included background information, experiments and activities for classroom and home use was provided to each teacher. During the course of the project activities, the teachers interacted with various university faculty members, scientists, and NASA staff. The administrative aspects of the program, the delivery of the services to participating teachers, and the project outcome are addressed.

  2. Renovation of the outside lighting - Bldg. 112 zone

    CERN Multimedia

    GS Department

    2010-01-01

    Due to the renovation of the outside lighting, the traffic will be disrupted along “Route Feynman”. From the water tower (Bldg. 227) to Restaurant Nr. 2 (Bldg. 504) between 18 and 30 August. We recommend great caution. Thank you for your understanding. SEM Group

  3. How to motivate homeowners to invest in sustainable renovation?

    DEFF Research Database (Denmark)

    Galiotto, Nicolas; Heiselberg, Per; Knudstrup, Mary-Ann

    2014-01-01

    important to integrate, aside the societal needs, the individual values which might motivate these decision-makers to undertake such a sustainable renovation. A critical review of decision-aid methods and tools, which are susceptible to be integrated in a process of home renovation, is presented...... in this paper. Methods have been primarily classified on the basis on whether or not they allow incorporating truthfully decision-makers’ individual values while still improving the process effectiveness. Reviewed tools have been classified as building analysis, optimization and decision making tools...... such as constructivist, interactive and iterative process, quantitative attributes and values based on qualitative judgments, simplicity and accuracy of the methods, time use and modularity are furthermore discussed. It is concluded that multi-criteria decision making approaches using interactive and constructivist...

  4. Rigorous project for existing houses. Energy conservation requires evolution; Rigoureus project voor bestaande woningen. Evolutie voor energiebesparing nodig

    Energy Technology Data Exchange (ETDEWEB)

    Clocquet, R. [DHV, Amersfoort (Netherlands); Koene, F. [ECN Efficiency and Infrastructure, Petten (Netherlands)

    2010-05-15

    How can existing terraced houses be renovated in such a way that their energy use decreases with 75 percent? The Rigorous project of the Energy research Centre of the Netherlands (ECN), TNO, Delft University of Technology and DHV, developed innovative renovation concepts that make such savings feasible by combining constructional measures with installation concepts. On top of that it is also essential that consumer behavior is addressed. [Dutch] Hoe kunnen bestaande rijtjeswoningen zo worden gerenoveerd dat het totale energiegebruik met 75 procent afneemt? In het Rigoureus-project hebben ECN, TNO, TU Delft en DHV innovatieve renovatieconcepten ontwikkeld die dat, door een combinatie van bouwkundige maatregelen en uitgeldende installatieconcepten, mogelijk maken. Daarbij blijkt het van essentieel belang ook het gebruikersgedrag aan te pakken.

  5. Midcentury Modern High Schools: Rebooting the Architecture

    Science.gov (United States)

    Havens, Kevin

    2010-01-01

    A high school is more than a building; it's a repository of memories for many community members. High schools built at the turn of the century are not only cultural and civic landmarks, they are also often architectural treasures. When these facilities become outdated, a renovation that preserves the building's aesthetics and character is usually…

  6. La inversión en energías renovables en Argentina

    OpenAIRE

    Recalde, Marina

    2017-01-01

    En este artículo se analiza en qué medida los factores del entorno de la política energética de un país en desarrollo, tal como Argentina, determinan la evolución de la inversión en energías renovables. La baja calidad institucional del país ayuda a crear condiciones no propicias que contrarrestan el efecto de la política energética, reduciendo los incentivos para invertir en tecnologías renovables. Es necesario entonces mejorar las condiciones institucionales de los países en desarrollo para...

  7. Limitaciones para el desarrollo de energías renovables en Argentina

    OpenAIRE

    Marina Yesica Recalde; Daniel Hugo Bouille; Leónidas Osvaldo Girardin

    2015-01-01

    En las últimas décadas las energías renovables han cobrado impulso a nivel mundial con un significativo impacto sobre el desarrollo sustentable de las naciones. Si bien diferentes trabajos analizan la eficiencia de políticas e instrumentos para la promoción de dichas fuentes, la mayoría de las veces se deja de lado el análisis de cómo el contexto en el cual las políticas son implementadas determina su performance. En este trabajo se analiza el desarrollo de las energías renovables en el merca...

  8. Disseny d’unitats de potabilització d’aigua mitjançant membranes alimentades amb energies renovables

    OpenAIRE

    Bargalló Poch, Josep Oriol

    2012-01-01

    En aquest projecte s’ha dissenyat una unitat de potabilització d’aigua mitjançant una membrana de separació, alimentada per energia renovable. En concret, s’ha dissenyat una planta portable capaç de dessalinitzar aigua de mar utilitzant energia solar. La dessalació és el procés de separació de minerals dissolts (sals) i altres substàncies indesitjables contingudes en les aigües salobres o marines, per convertir-les en aigua adequada per el consum humà, apte per el seu ús indust...

  9. Socioeconomic Renovation in Viet Nam: The Origin, Evolution, and ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Referred to as doi moi, this "renovation" has produced dramatic changes in ... In this book, Vietnamese scholars describe the origins and impacts of these changes. ... for two Colombian cities were discussed at ADAPTO's second international ...

  10. Interior renovation of a general practitioner office leads to a perceptual bias on patient experience for over one year.

    Science.gov (United States)

    Gauthey, Jérôme; Tièche, Raphaël; Streit, Sven

    2018-01-01

    Measuring patient experience is key when assessing quality of care but can be biased: A perceptual bias occurs when renovations of the interior design of a general practitioner (GP) office improves how patients assessed quality of care. The aim was to assess the length of perceptual bias and if it could be reproduced after a second renovation. A GP office with 2 GPs in Switzerland was renovated twice within 3 years. We assessed patient experience at baseline, 2 months and 14 months after the first and 3 months after the second renovation. Each time, we invited a sample of 180 consecutive patients that anonymously graded patient experience in 4 domains: appearance of the office; qualities of medical assistants and GPs; and general satisfaction. We compared crude mean scores per domain from baseline until follow-up. In a multivariate model, we adjusted for patient's age, gender and for how long patients had been their GP. At baseline, patients aged 60.9 (17.7) years, 52% females. After the first renovation, we found a regression to the baseline level of patient experience after 14 months except for appearance of the office (pInterior renovation of a GP office probably causes a perceptual bias for >1 year that improves how patients rate quality of care. This bias could be reproduced after a second renovation strengthening a possible causal relationship. These findings imply to appropriately time measurement of patient experience to at least one year after interior renovation of GP practices to avoid environmental changes influences the estimates when measuring patient experience.

  11. Childcare outdoor renovation as a built environment health promotion strategy: evaluating the preventing obesity by design intervention.

    Science.gov (United States)

    Cosco, Nilda G; Moore, Robin C; Smith, William R

    2014-01-01

    To evaluate the effectiveness of Preventing Obesity by Design (POD), a childcare center outdoor renovation intervention. Pre-post intervention evaluation. North Carolina licensed childcare centers (N = 27). Preschool children. Outdoor renovation, teacher training. Behavior mapping, Preschool Outdoor Environment Measurement Scale (POEMS), center director interview. Descriptive statistics, ordinary least squares and logistic regressions calculated to assess levels of association between environmental change, children's physical activity (PA), social behaviors, and environmental quality. Qualitative interview data analyzed to help understand intervention impact. Behavior mapping showed that site layout attributes, such as the form (i.e., "single loop" and "double loop") of pathways (functioning as circulation routes and wheeled toy settings), are associated with higher levels of PA. Teacher interaction was associated with decreased children's PA. Absence of teacher or lack of child/child interaction was associated with increased PA. POEMS assessment of environmental quality was higher after renovation. POEMS domains (Physical Space and Teacher/Caregiver Roles) were positively associated with PA. After renovation, 68% of center directors reported positive changes in children's behavior and 40% mentioned edible plant installations as greatest success. Built environment renovation of childcare center outdoors, including looped pathways installation, coupled with teacher training, may support increased PA. Renovation, including food gardens, may be a key to success for preschool health promotion and support change in childcare policy.

  12. White Pine Co. Public School System Biomass Conversion Heating Project

    Energy Technology Data Exchange (ETDEWEB)

    Paul Johnson

    2005-11-01

    The White Pine County School District and the Nevada Division of Forestry agreed to develop a pilot project for Nevada using wood chips to heat the David E. Norman Elementary School in Ely, Nevada. Consideration of the project was triggered by a ''Fuels for Schools'' grant that was brought to the attention of the School District. The biomass project that was part of a district-wide energy retrofit, called for the installation of a biomass heating system for the school, while the current fuel oil system remained as back-up. Woody biomass from forest fuel reduction programs will be the main source of fuel. The heating system as planned and completed consists of a biomass steam boiler, storage facility, and an area for unloading and handling equipment necessary to deliver and load fuel. This was the first project of it's kind in Nevada. The purpose of the DOE funded project was to accomplish the following goals: (1) Fuel Efficiency: Purchase and install a fuel efficient biomass heating system. (2) Demonstration Project: Demonstrate the project and gather data to assist with further research and development of biomass technology; and (3) Education: Educate the White Pine community and others about biomass and other non-fossil fuels.

  13. Examining Thai high school students' developing STEM projects

    Science.gov (United States)

    Teenoi, Kultida; Siripun, Kulpatsorn; Yuenyong, Chokchai

    2018-01-01

    Like others, Thailand education strongly focused on STEM education. This paper aimed to examine existing Thai high school students' integrated knowledge about science, technology, engineering, and mathematics (STEM) in their developing science project. The participants included 49 high school students were studying the subject of individual study (IS) in Khon Kaen wittayayon school, Khon Kaen, Thailand. The IS was provided to gradually enhance students to know how to do science project starting from getting start to do science projects, They enrolled to study the individual study of science project for three year in roll. Methodology was qualitative research. Views of students' integrated knowledge about STEM were interpreted through participant observation, interview, and students' science projects. The first author as participant observation has taught this group of students for 3 years. It found that 16 science projects were developed. Views of students' integrated knowledge about STEM could be categorized into three categories. These included (1) completely indicated integration of knowledge about science, technology, engineering, and mathematics, (2) partial indicated integration of knowledge about science, technology, engineering, and mathematics, and (3) no integration. The findings revealed that majority of science projects could be categorized as completely indicated integration of knowledge about science, technology, engineering, and mathematics. The paper suggested some ideas of enhancing students to applying STEM for developing science projects.

  14. Success for energy efficient renovation of dwellings—Learning from private homeowners

    International Nuclear Information System (INIS)

    Risholt, Birgit; Berker, Thomas

    2013-01-01

    Large scale energy efficient renovation of buildings is one of the most important tools to realize the society's need of a more sustainable building stock. Most Norwegians own their own homes. Therefore private homeowners are a focus group for the government urging to accelerate the dwelling energy efficiency rates. Success factors were identified in the in-depth study of the decision process of eleven homeowners. Large differences in energy use due to the building's condition and the occupants' behavior was encountered in the sample. Only homeowners who were conscious consumers and did not trust expert advice or that had special knowledge due to their professions succeeded in realizing energy efficiency by renovation. Lack of knowledge, bad advice from craftsmen or priority to work that they can do themselves stopped other homeowners from implementing energy efficiency. Increased knowledge on all the gains from energy efficiency, the availability of attractive products and services as well as easy access to reliable advice on the better renovation solutions have a large potential to get more homeowners to make energy efficient choices in the process of renovation. Coordination of more of policy strategies including specific information and incentives are needed to facilitate this. - Highlights: • Private homeowners are a key group to increase the dwelling energy efficiency rates. • The annual energy use varies from 103 kW h/m 2 to 240 kW h/m 2 in similar dwellings. • Homeowners that are conscious consumers or have knowledge succeed in saving energy. • Access to relevant and reliable advice can get homeowners to realize energy savings. • Craftsmen could be mediators between available products and the specific building

  15. The Physical Activity and Redesigned Community Spaces (PARCS Study: Protocol of a natural experiment to investigate the impact of citywide park redesign and renovation

    Directory of Open Access Journals (Sweden)

    Terry T. K. Huang

    2016-11-01

    Full Text Available Abstract Background The built environment plays a critical role in promoting physical activity and health. The association between parks, as a key attribute of the built environment, and physical activity, however, remains inconclusive. This project leverages a natural experiment opportunity to assess the impact of the Community Parks Initiative (CPI, a citywide park redesign and renovation effort in New York City, on physical activity, park usage, psychosocial and mental health, and community wellbeing. Methods The project will use a longitudinal design with matched controls. Thirty intervention park neighborhoods are socio-demographically matched to 20 control park neighborhoods. The study will investigate whether improvements in physical activity, park usage, psychosocial and mental health, and community wellbeing are observed from baseline to 3 years post-renovation among residents in intervention vs. control neighborhoods. Discussion This study represents a rare opportunity to provide robust evidence to further our understanding of the complex relationship between parks and health. Findings will inform future investments in health-oriented urban design policies and offer evidence for addressing health disparities through built environment strategies.

  16. Analysis of energy economic renovation for historic wooden apartment buildings in cold climates

    International Nuclear Information System (INIS)

    Arumägi, Endrik; Kalamees, Targo

    2014-01-01

    Highlights: • Energy saving potential in historic wooden apartment buildings is up to 63%. • In historic wooden apartment buildings an economically viable energy saving level is 50%. • The largest energy saving potential lies in heat source and building service systems. • Of the building structures, insulation of the external wall has the highest potential. • New heating and ventilation systems must be installed to fulfill regulations limits. - Abstract: Buildings represent the largest sector of primary energy consumption and play a major role in saving energy and reducing greenhouse gas emissions. Our analysis of energy consumption and potential energy savings is based on field measurements, computer simulations and economic calculations. The average primary energy consumption (PE) of wooden apartment buildings was 331 kW h/(m 2 a) 83% higher than the limit 180 kW h/(m 2 a) set in national regulations for apartment buildings subject to major renovation. The studied buildings represent a high potential for energy savings. The renovation packages were compiled using different insulation measures, HVAC solutions and energy sources to achieve a 20–65% reduction of primary energy. For historic buildings, the renovation solutions that concentrate on the building envelope can be problematic due to the need to preserve cultural and architectural values. Our calculation results indicate that the cost optimal PE level is around 250 kW h/(m 2 a) and the point at which renovation packages recover expenses is around a PE level of 170 kW h/(m 2 a). In terms of the architectural appearance the point at which renovation packages recover expenses is around a PE level of 210 kW h/(m 2 a). We propose to set a different PE limit for historic wooden apartment buildings with an architectural appearance worth preserving

  17. Analysis and Comparison of Overheating Indices in Energy Renovated Houses

    DEFF Research Database (Denmark)

    Psomas, Theofanis Ch.; Heiselberg, Per Kvols; Duer, Karsten

    2015-01-01

    The scientific literature offers a number of methods for assessing the likelihood of overheating in buildings. The paper calculates eight well-documented indices for four representative family houses, from moderate and temperate climates, under different renovation processes (66 variants), with t......The scientific literature offers a number of methods for assessing the likelihood of overheating in buildings. The paper calculates eight well-documented indices for four representative family houses, from moderate and temperate climates, under different renovation processes (66 variants......), with the use of multi-zone energy software. In two out of four cases, the calculation included passive cooling measures for optimization purposes (shading, ventilative cooling). The analysis shows strong correlations between different methods-indices originating from the same comfort model theory independently...

  18. Projective Test Use among School Psychologists: A Survey and Critique

    Science.gov (United States)

    Hojnoski, Robin L.; Morrison, Rhonda; Brown, Melissa; Matthews, William J.

    2006-01-01

    The use of projective techniques by school psychologists has been a point of interest and debate, with a number of survey studies documenting usage. The purpose of this study is to update the status of projective use among school psychologists, with a specific focus on their use in the social emotional assessment of children in schools. In…

  19. CERN's PS Booster LLRF renovation : plans and initial beam tests

    CERN Document Server

    Angoletta, ME; Butterworth, A; Findlay, A; Leinonen, PM; Molendijk, JC; Pedersen, F; Sanchez-Quesada, J; Schokker, M

    2010-01-01

    In 2008 a project was started to renovate the CERN's PS Booster (PSB) low-level RF (LLRF). Required LLRF capabilities include frequency program, beam phase, radial and synchronization loops. The new LLRF will control the signals feeding the three RF cavities present in each ring; it will also shape the beam in a dual harmonic mode, operate a bunch splitting and create a longitudinal blow-up. The main benefits of this new LLRF are its full remote and cycle-to-cycle controllability, built-in observation capability and flexibility. The overall aim is to improve the robustness, maintainability and reliability of the PSB operation and to make it compatible with the injection from the future Linac4. This paper outlines the main characteristics of the software and hardware building blocks. Initial beam test results and hints on the main milestones and future work are also given.

  20. Initiatives for the energy renovation of single-family houses inDenmark evaluated on the basis of barriers and motivators

    DEFF Research Database (Denmark)

    Grøn Bjørneboe, Matilde; Svendsen, Svend; Heller, Alfred

    2018-01-01

    The renovation of single-family houses in Denmark is progressing only slowly. Changes in current pol-icy are needed if the political goal of a fossil-free building sector as part of a fossil-free society is to beachieved. Known barriers and motivators for energy renovation are identified, and arr......The renovation of single-family houses in Denmark is progressing only slowly. Changes in current pol-icy are needed if the political goal of a fossil-free building sector as part of a fossil-free society is to beachieved. Known barriers and motivators for energy renovation are identified......, suggestions are madefor improvement in four areas: (1) focus on non-energy benefits rather than investment, (2) enhance-ment of subsidy system, (3) including relevant renovation plans in the energy performance certificate(EPC), and (4) long-term regulation on the maximum allowed energy consumption of houses....

  1. From the handbooks for the History to the history of the History as a school disciplin

    Directory of Open Access Journals (Sweden)

    Rafael VALLS MONTES

    2013-11-01

    Full Text Available In recent years a very important change in studies related to history as a school discipline has taken place. A wide range of factors have acted at the base of this change. They have allowed us to better known its constitutive characteristics and its later evolution, strongly defined by inercia and routine. The intention of these studies is genealogical and not archaeological nor erudite, so they provide a will for educative renovation, that goes further than idealistic projects, wich have turned out to be insuficient in overcoming known deficiencies.

  2. Sewerage systems: Overflow problems and renovation methods

    Energy Technology Data Exchange (ETDEWEB)

    Tanttu, Unto [Plancenter Ltd. (Finland)

    1987-12-15

    Total investments in Finland (1984) spent on sewer systems were roughly FIM 590 million. A big share, about 14 % of this sum (FIM 82 million), was spent on rehabilitation of networks. But is this still enough? According to some evaluations the respective amount should be about FIM 500 million for rehabilitation only. So the question, how to keep the performance of sewer networks satisfactory in the future, is really important. The overflow problem is one of the most serious problems caused by old and improperly working sewer systems. Anyhow, several other aspects of a poor condition of sewers are to be seen: - excess hydraulic loading of treatment plants, - normal maintenance and operation (flushing, opening of clogs) increases, and is more expensive, - unexpected renovation works and interruptions in operation cause e.g. troubles in traffic, odour problems in the environment, hygienic hazards etc., - the performance of other underground networks (water pipes, district heating pipes etc.) may be threatened by earth crushings due to old sewers. In this paper a short description of these items is presented as well as a description of the sewer renovation methods used recently in Finland.

  3. Building a partnership to evaluate school-linked health services: the Cincinnati School Health Demonstration Project.

    Science.gov (United States)

    Rose, Barbara L; Mansour, Mona; Kohake, Kelli

    2005-12-01

    The Cincinnati School Health Demonstration Project was a 3-year collaboration that evaluated school-linked health services in 6 urban elementary (kindergarten to eighth grade) schools. Partners from the Cincinnati Health Department, Cincinnati Public Schools, Cincinnati Children's Hospital Medical Center, and The Health Foundation of Greater Cincinnati wanted to determine if levels of school-linked care made a difference in student quality of life, school connectedness, attendance, emergency department use, and volume of referrals to health care specialists. School nurses, principals and school staff, parents and students, upper-level managers, and health service researchers worked together over a 2.5-year period to learn about and use new technology to collect information on student health, well-being, and outcome measures. Varying levels of school health care intervention models were instituted and evaluated. A standard model of care was compared with 2 models of enhanced care and service. The information collected from students, parents, nurses, and the school system provided a rich database on the health of urban children. School facilities, staffing, and computer technology, relationship building among stakeholders, extensive communication, and high student mobility were factors that influenced success and findings of the project. Funding for district-wide computerization and addition of school health staff was not secured by the end of the demonstration project; however, relationships among the partners endured and paved the way for future collaborations designed to better serve urban school children in Cincinnati.

  4. Method for a component-based economic optimisation in design of whole building renovation versus demolishing and rebuilding

    DEFF Research Database (Denmark)

    Morelli, Martin; Harrestrup, Maria; Svendsen, Svend

    2014-01-01

    investing in retrofit measures and buying renewable energy. The overall cost of the renovation considers the market value of the property, the investment in the renovation, the operational and maintenance costs. A multi-family building is used as an example to clearly illustrate the application...... of the method from macroeconomic and private financial perspectives. Conclusion: The example shows that the investment cost and future market value of the building are the dominant factors in deciding whether to renovate an existing building or to demolish it and thereafter erect a new building. Additionally...

  5. On Stakeholders and the Decision Making Process Concerning Sustainable Renovation and Refurbishment in Sweden, Denmark and Cyprus

    DEFF Research Database (Denmark)

    Gohardani, Navid; Björk, Folke; Jensen, Per Anker

    2013-01-01

    This article examines the decision making process related to sustainable renovation and refurbishment in buildings. The utilized methodology identifies three distinct phases in order to instigate an engagement in sustainable renovation, by means of questionnaires and semi-structured interviews...

  6. Negotiating heritage in Danish public housing renovation

    DEFF Research Database (Denmark)

    Martens Gudmand-Høyer, Sidse

    2017-01-01

    This paper presents a significant problem when it comes to the challenging task of safeguarding recent past architectural heritage with reference to the democratization ideals propagated by the New Heritage paradigm. Based on controversy mapping relating to the renovation of a Danish 1950s high...... and the performance of interventions conveying heritage understandings can be addressed and given a binding form for this process and its partners....

  7. Sustainable renovation of residential buildings and the landlord/tenant dilemma

    International Nuclear Information System (INIS)

    Ástmarsson, Björn; Jensen, Per Anker; Maslesa, Esmir

    2013-01-01

    The landlord/tenant dilemma arises when the interests of landlords and tenants misalign and is one of the greatest barriers hindering the development of sustainable renovation of residential buildings in Europe. The aim of this research is to investigate how regulatory changes and contractual solutions can help solve the landlord/tenant dilemma in relation to sustainable renovation of residential buildings, and how the general awareness of sustainable renovation can be increased. Particular focus is on whether tools like energy performance contracting and energy labeling can help solve the landlord/tenant dilemma. The research was done in relation to the specific situation in Denmark, but theory, information and experiences from other countries were included. The results show that there are plenty of opportunities to overcome the landlord/tenant dilemma, but principal/agent problems can only be overcome with a package solution. In the Danish national context the package solution must consist of legislative changes, financial incentives and better dissemination of information. Therefore, an array of different tools must be integrated and used in cooperation to overcome the dilemma. - Highlights: • There are plenty of opportunities to overcome the landlord/tenant dilemma. • The principal/agent problems can only be overcome with a package solution. • An array of different tools must be integrated and used in cooperation. • Legislative changes, financial incentives and better dissemination of information

  8. Prevention of homicidal violence in schools in Germany: the Berlin Leaking Project and the Networks Against School Shootings Project (NETWASS).

    Science.gov (United States)

    Leuschner, Vincenz; Bondü, Rebecca; Schroer-Hippel, Miriam; Panno, Jennifer; Neumetzler, Katharina; Fisch, Sarah; Scholl, Johanna; Scheithauer, Herbert

    2011-01-01

    Since 1999, Germany has experienced at least twelve serious cases of targeted school violence. This article describes two projects designed to fill the gap between universal prevention and emergency response in preventing severe forms of school violence in Germany. The Berlin Leaking Project examined the viability of preventive efforts based on early identification of leaking behavior that often precedes targeted school attacks. Leaking refers to any behavior or communication that indicates a student is preparing to carry out a violent attack. This would include explicit or implied threats of violence, apparent fascination with prior acts of violence such as Columbine, and any evidence of planning or preparation to carry out an attack. The NETWASS project will test a training program and intervention strategy based on those findings, examining the usefulness of a threat assessment approach to prevent violence by training teachers to recognize leaking behavior by students. This approach is extended by training teachers on a larger scale to identify leaking and then having a school-based team evaluate the student and initiate appropriate interventions, such as mental health services, and in some cases, law enforcement action. Copyright © 2011 Wiley Periodicals, Inc., A Wiley Company.

  9. Design Problems With Renovating And Adapting An Old Mill On The Example Of The Execution Of An Original Project

    Science.gov (United States)

    Grzonka, Aleksandra

    2015-12-01

    Nowadays, postindustrial areas and buildings are becoming more and more valuable. Very popular are those with special historical and architectural values, which are additionally located in large cities. The situation of those possessing fewer attributes encouraging their adaptation is worse. Sometimes, however, there are reasons why a decision is made to invest in such buildings despite the many difficulties connected with the implementation of these investments. This situation was presented on the example of the renovation and adaptation of an old electric mill in Łaziec into a restaurant.

  10. Design Problems With Renovating And Adapting An Old Mill On The Example Of The Execution Of An Original Project

    Directory of Open Access Journals (Sweden)

    Grzonka Aleksandra

    2015-12-01

    Full Text Available Nowadays, postindustrial areas and buildings are becoming more and more valuable. Very popular are those with special historical and architectural values, which are additionally located in large cities. The situation of those possessing fewer attributes encouraging their adaptation is worse. Sometimes, however, there are reasons why a decision is made to invest in such buildings despite the many difficulties connected with the implementation of these investments. This situation was presented on the example of the renovation and adaptation of an old electric mill in Łaziec into a restaurant.

  11. The appeal of the green deal: Empirical evidence for the influence of energy efficiency policy on renovating homeowners

    International Nuclear Information System (INIS)

    Pettifor, H.; Wilson, C.; Chryssochoidis, G.

    2015-01-01

    The Green Deal is a major new energy policy designed to support the diffusion of energy efficiency measures in UK homes. This paper provides one of the first empirical examinations of the Green Deal′s success in influencing homeowners’ renovation decisions. Using a repeated measures design in which households were questioned before and after the Green Deal′s launch in January 2013, we assess the policy′s success in raising awareness of energy efficiency. In particular, we test the effectiveness of the Green Deal′s positioning to overcome barriers to renovation among homeowners already interested in or considering energy efficiency measures. Using the innovation decision process (Rogers, 2003) as a conceptual framing of the renovation decision process, we examine whether new information on energy efficiency provided by the Green Deal strengthened intentions and its antecedents. We find that (1) energy efficiency is of potential appeal to all renovators regardless of their attitudes about energy efficiency, (2) energy efficiency opportunities need to be identified in the early stages of renovation when homeowners are thinking about ways to improve their home, and (3) homeowners’ intentions towards energy efficiency are weakened by uncertainty about financial benefits, helping to explain the relatively slow uptake of the Green Deal to-date. - Highlights: • Examines the impact of a major new energy policy, the Green Deal, on intentions towards energy efficiency. • 502 households questioned four months prior to, and seven months after the launch. • Renovating itself is mechanism through which households engage with the Green Deal. • Strengthening beliefs in energy savings accelerates intentions to renovate energy efficiently

  12. Barriers and Potential Solutions for Energy Renovation of Buildings in Denmark

    Directory of Open Access Journals (Sweden)

    Niels I. Meyer

    2014-02-01

    Full Text Available Buildings account for a substantial part of the total energy consumption. In Denmark this number is about 40 % and this is approximately the same in most industrial countries. On this background there is an urgent need to develop strategies for reducing the energy demand in the building sector. Renovation of existing buildings must have high priority as houses often last for 50 to 100 years, while the time perspective for the desired transformation to low-energy houses is less than 30 years in order to mitigate global warming and avoid irreversible tipping-points. The only sustainable energy supply in the perspective of centuries is renewable energy provided by the sun and exploited in the form of solar heat, solar electricity (PVs, wind power, hydropower, wave power, and some types of biomass etc. A future dominating role of intermittent renewable sources requires new integrated systems thinking on both the supply and demand side for heat, electricity and transport. Implementing such Smart Energy Systems requires integrated strategic energy planning on the national and local level. With the fundamental changes in the energy supply technologies expected during the coming years, it is important to synchronize investments in energy conservation measures with investments in the supply side, in order to avoid overinvestment in supply systems and thus to minimize the total costs of the transformation to Smart Energy Systems. This paper highlights some of the most important barriers for renovation of existing buildings in Denmark and points to policies for overcoming these barriers. Some of the policies have been presented in the reports of a recent Danish research project (CEESA

  13. Renovation and Expansion of the Caspary Research Building. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Grassia, V. L.

    2004-02-07

    Critical to the Hospital's rebuilding efforts have been its public partners at the federal, state, and local government levels who have made a major financial commitment to renovating the Hospital's research infrastructure. To date, the Hospital for Special Surgery (HSS) has been awarded a total of nearly $8.5 million to create and equip new, state-of-the-art laboratories for scientific investigations. The modernization of the Hospital's research facilities was jump-started in 1998 with a $950,000 seed grant from the National Institutes of Health (NIH) to renovate laboratories for immunology research in the Caspary Research Building. Coupled with a matching $5.5 million commitment from HSS, this infusion of NIH funding laid the groundwork for an overhaul of all of the Hospital's research space.

  14. Energy Smart Schools--Applied Research, Field Testing, and Technology Integration

    Energy Technology Data Exchange (ETDEWEB)

    Nebiat Solomon; Robin Vieira; William L. Manz; Abby Vogen; Claudia Orlando; Kimberlie A. Schryer

    2004-12-01

    The National Association of State Energy Officials (NASEO) in conjunction with the California Energy Commission, the Energy Center of Wisconsin, the Florida Solar Energy Center, the New York State Energy Research and Development Authority, and the Ohio Department of Development's Office of Energy Efficiency conducted a four-year, cost-share project with the U.S. Department of Energy (USDOE), Office of Energy Efficiency and Renewable Energy to focus on energy efficiency and high-performance technologies in our nation's schools. NASEO was the program lead for the MOU-State Schools Working group, established in conjunction with the USDOE Memorandum of Understanding process for collaboration among state and federal energy research and demonstration offices and organizations. The MOU-State Schools Working Group included State Energy Offices and other state energy research organizations from all regions of the country. Through surveys and analyses, the Working Group determined the school-related energy priorities of the states and established a set of tasks to be accomplished, including the installation and evaluation of microturbines, advanced daylighting research, testing of schools and classrooms, and integrated school building technologies. The Energy Smart Schools project resulted in the adoption of advanced energy efficiency technologies in both the renovation of existing schools and building of new ones; the education of school administrators, architects, engineers, and manufacturers nationwide about the energy-saving, economic, and environmental benefits of energy efficiency technologies; and improved the learning environment for the nation's students through use of better temperature controls, improvements in air quality, and increased daylighting in classrooms. It also provided an opportunity for states to share and replicate successful projects to increase their energy efficiency while at the same time driving down their energy costs.

  15. Renovation techniques for fatigue cracked orthotropic steel bridge decks

    NARCIS (Netherlands)

    de Jong, F.B.P.

    2007-01-01

    This dissertation presents the research into renovation techniques for orthotropic steel bridge decks. These techniques are needed to solve fatigue problems in the decks of these bridges, as several fatigue cracks have been detected in the deck structure of these bridges the last decade. A

  16. CEBAF Control Room Renovation

    International Nuclear Information System (INIS)

    Michael Spata; Thomas Oren

    2005-01-01

    The Machine Control Center (MCC) at Jefferson Lab's Continuous Electron Beam Accelerator Facility (CEBAF) was initially constructed in the early 1990s and based on proven technology of that era. Through our experience over the last 15 years and in our planning for the facility's 12 GeV upgrade we reevaluated the control room environment to capitalize on emerging visualization and display technologies and improve workflow processes and ergonomic attributes. This effort also sets the foundation for the redevelopment of the accelerator's control system to deliver high reliability performance with improvements in beam specifications management and information flow. The complete renovation was performed over a three-week maintenance period with no interruption to beam operations. We present the results of this effort

  17. CEBAF Control Room Renovation

    International Nuclear Information System (INIS)

    Michael Spata; Thomas Oren

    2005-01-01

    The Machine Control Center at Jefferson Lab's Continuous Electron Beam Accelerator Facility was initially constructed in the early 1990s and based on proven technology of that era. Through our experience over the last 15 years and in our planning for the facilities 12 GeV upgrade we reevaluated the control room environment to capitalize on emerging visualization and display technologies and improve on workflow processes and ergonomic attributes. This effort also sets the foundation for the redevelopment of the accelerator's control system to deliver high reliability performance with improvements in beam specifications management and information flow. The complete renovation was performed over a three-week period with no interruption to beam operations. We present the results of this effort

  18. A vision of year 2030 on the use of the renewable energies in Mexico; Una vision al 2030 de la utilizacion de las energias renovables en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Mulas del Pozo, Pablo [Universidad Autonoma Metropolitana, Mexico, D.F. (Mexico)

    2005-08-15

    The Direccion General de Desarrollo Tecnologico of the Secretaria de Planeacion y Desarrollo (main directorate of technological development of the secretariat of planning and technological development) of the Secretaria de Energia (Sener), with the support of the World Bank performed a study, coordinated by Pablo Mulas del Pozo to analyze the possible penetration of the renewable energy sources in Mexico between today and year 2030. In this project are included as small renewable sources the small hydroelectric plants (mini, micro and smaller than 20 MW), the geothermal, the solar energy, the wind energy and the biomass. As part of this study three large lines of reflection are contemplated: (1) a bibliographical revision of the possible futures of the renewable energies, including some projections over the future evolution of the national power sector, and over the technological status of the same ones; (2) Projections on the possible future evolution of the national power sector and the possible penetration of the renewable sources of energy in it, using a simulation model (LEAP model); and (3) Groups of approach to consult experts on different aspects related to the possible future penetration of the renewable sources of energy in Mexico (especially, on present and future obstacles that face the renewable sources in our country, the possible carrying events of future which could modify the rate of penetration of these energies, and possible policy guidelines that could benefit the penetration of the same ones as of today). [Spanish] La Direccion General de Desarrollo Tecnologico de la Secretaria Planeacion y Desarrollo Tecnologico de la Sener, con el apoyo del Banco Mundial realizo un estudio, coordinado por el Pablo Mulas del Pozo, para analizar la posible penetracion de las fuentes renovables de energia en Mexico entre hoy y el ano 2030. En dicho proyecto se incluyen como fuentes renovables a las pequenas hidroelectricas (micro y mini, menores de 20 MW), la

  19. Collaborative business model development for home energy renovations

    NARCIS (Netherlands)

    Mlecnik, E.; Straub, A.; Haavik, T

    2018-01-01

    In the EU, housing retrofit rates have to increase to about 2.5–3% of the housing stock per year to achieve policy goals. The development of new business models and collaboration of SMEs in a fragmented market is expected to result in an increase in home renovations. This study presents a way to

  20. French practice of the renovation of I and C systems in 900 MW NPP's

    International Nuclear Information System (INIS)

    Dall'agnol, A.

    1998-01-01

    From 1993 to 1995, EDF led I and C renovation studies. These studies aimed at identifying the I and C components which were not able to be kept in operation up to the 3 rd ten year outage and to propose adequate solutions in consequence. Both technical and economic aspects have been dealt with. An Observation Phase gave the necessary elements for decisions on obsolescence and ageing of equipment. Basis Preliminary Studies were intended to propose solutions for the replacement of equipment that would not fulfill the criterion. The project concluded that the major parts of I and C components were in good working order and a very few of them needed further studies. (author)

  1. Renovation of the CERN outdoor lighting

    CERN Multimedia

    GS Department

    2010-01-01

    Due to the renovation of the CERN outdoor lighting, traffic will be limited to one way along “Route Gregory” from the E entrance (France) up to “Route Fermi” just before the water tower between 12th and 23rd July 2010. Disruption can also be expected in the car parks “Les Erables” and “Les Tilleuls” close to building 30 and also the car park in front of building 377, between 19th and 30th July 2010. Thanks for your understanding. SEM Group

  2. Sustainable (Re)Construction : The Potential of the Renovation Market

    NARCIS (Netherlands)

    Usanov, A.; Chivot, E.

    2013-01-01

    The Sustainable Urban (Re)Construction Briefing argues that renovation is going to play an increasingly important role in the overall construction market – for several reasons. One of them is the urgency of climate change mitigation. Europe has a large stock of buildings, which together contribute

  3. Undergraduate degree projects in the Swedish dental schools: a documentary analysis.

    Science.gov (United States)

    Franzén, C; Brown, G

    2013-05-01

    Undergraduate degree projects have currently been introduced into courses in the four Swedish dental schools. The rationale for research projects is that they enable students to develop research expertise skills and to show their ability to apply and develop knowledge relevant to professional practice. This paper reports a qualitative analysis of the curriculum documents and handbooks including the criteria used to assess the students' research reports. The aim was to investigate commonalities and differences in the design of degree projects between the four Swedish dental schools and to explore any inconsistencies within the documents. The documentary analysis was based on the constant comparison method. Four overarching themes emerged from the analysis: (i) developing scientific expertise, (ii) developing professional expertise, (iii) following rules and (iv) fostering creativity. The documents from the four dental schools revealed similar views on the purposes of the projects and provided similar assessment criteria. The students were requested to formulate an odontological problem, apply a relevant scientific method, analyse texts and empirical data, express critical reflections and write a short thesis. The students were free to choose topics. There were differences between the dental schools on the emphasis placed on practical uses of the projects and theoretical background of the projects. Two of the schools insisted on rigid rules of completing and writing the project yet paradoxically emphasised creativity. There were wide variations in the required length of the project report. The report may prove useful to dental schools in other countries who are about to design undergraduate research projects. © 2013 John Wiley & Sons A/S. Published by Blackwell Publishing Ltd.

  4. Growing Pains: Scaling up the Nation's Best Charter Schools. Education Sector Reports

    Science.gov (United States)

    Education Sector, 2009

    2009-01-01

    Amistad Academy is a bright shining star in public school reform. Founded in 1999 in a renovated warehouse in a blighted New Haven, Connecticut, neighborhood by a group of Yale law school students, the 289-student charter school has won the praise of the last two federal education secretaries. Educators throughout the country have traveled to the…

  5. New potentional of high-speed water jet technology for renovating concrete structures

    Science.gov (United States)

    Bodnárová, L.; Sitek, L.; Hela, R.; Foldyna, J.

    2011-06-01

    The paper discusses the background and results of research focused on the action of a high-speed water jet on concrete with different qualities. The sufficient and careful removal of degraded concrete layers is very important for the renovation of concrete structures. High-speed water jet technology is one of the most common methods used for removing degraded concrete layers. Different types of high-speed water jets were tested in the experimental part. The classical technology of a single continuous water jet generated with one nozzle was tested as well as the technology of revolving water jets generated by multiple nozzles (used mainly for the renovation of larger areas). A continuous flat water jet and pulsating flat water jet were tested the first time, because the connection of a water jet with the acoustic generator of a pulsating jet offers new possibilities for the use of a water jet (see [1] and [2]). A water jet with such a modification is capable of efficient action and can even be used for cutting solid concrete with a relatively low consumption of energy. A flat pulsating water jet which can be newly used for renovation seems to be a promising technology.

  6. Implicaciones ambientales de las tecnologías de energía renovable

    Directory of Open Access Journals (Sweden)

    Jan Mahirt-Smith

    2011-12-01

    Full Text Available Las tecnologías de energía renovable como la eólica, la solar y la biomasa, hacen un uso del suelo más intenso que las de combustibles fósiles tradicionales y, geográficamente, sus implicaciones ambientales son más heterogéneas, por lo que presentan un gran desafío para las técnicas de evaluación de su ciclo de vida. Este trabajo presenta los resultados de una investigación bibliográfica alrededor de los siguientes temas: 1 cambios en el uso del suelo debido a la mayor producción de energía renovable; 2 impactos del uso de suelo; 3 variabilidad geográfica en el inventario de datos; y 4 efectos de la distribución de energía. Además, se revisa el grado de investigación que actualmente se aplica acerca de las tecnologías de energía renovable en campos como el eólico, el solar y la bioenergía y en la evaluación del ciclo de vida en general.

  7. Energy Design Guidelines for High Performance Schools: Tropical Island Climates

    Energy Technology Data Exchange (ETDEWEB)

    2004-11-01

    The Energy Design Guidelines for High Performance Schools--Tropical Island Climates provides school boards, administrators, and design staff with guidance to help them make informed decisions about energy and environmental issues important to school systems and communities. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school in tropical island climates. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs.

  8. Implementation of municipal health promoting projects in primary schools: teachers perspective

    DEFF Research Database (Denmark)

    Nordin, Lone Lindegard

    2013-01-01

    . The project is funded by the Danish Ministry of Science, University of Aarhus and Silkeborg municipality, and involves 5 primary schools, 23 teachers and 233 pupils from 7th to 9 class. The project is positioned within the critical approach to school health education and health promotion, developed......Implementation of municipally health promoting projects' in primary schools: teachers perspective Research question This paper discusses the findings from a qualitative research, that aimed to investigate how teachers in primary schools implemented municipal health promoting projects focusing...... that there is a “gap” between policy and practice according to aim, content and methods, and that teachers practice can be explained as coping mechanism. The key findings include: • Teachers practice is closer to traditional health education than critical health education. • Teachers priorities the mandatory teaching...

  9. Reading and Writing Gains for Maori Students in Mainstream Schools: Effective Partnerships in the Rotorua Home and School Literacy Project.

    Science.gov (United States)

    Glynn, Ted; Berryman, Mere; Glynn, Vin

    The Rotorua Energy Charitable Trust with support from the Ministry of Education funded a home and school literacy project in nine Rotorua primary schools. The project funded each school to train a home-school liaison worker (either a school staff member or a community person) to assist schools in developing a working partnership with the students'…

  10. A multi-methodology and sustainability-supporting framework for implementation and assessment of a holistic building renovation: Implementation and assessment of a holistic sustainable building renovation

    DEFF Research Database (Denmark)

    Kamari, Aliakbar

    . The research strategy employed in this thesis presents characteristics of two research types, namely the qualitative research approach, and the inter- or transdisciplinary research throughout mode 2. It therefore calls for an inductive research approach and involves an interpretive approach and comparative...... a deep building renovation and an ordinary one is a commitment to a holistic approach in which objectives/criteria are targeted early in the design stages and subsequently are considered for their interdependence throughout sustainability perspectives. A review of recent research has revealed...... is entitled RE-VALUE . The case study is Section 3 of Skovgårdsparken located in Brabrand, Denmark. It is a social housing complex (including nine blocks), and has been renovated by Brabrand Housing Association. The future of the research in this thesis concerns expanding of the TSBD framework for Building...

  11. Energy Design Guidelines for High Performance Schools: Arctic and Subarctic Climates

    Energy Technology Data Exchange (ETDEWEB)

    2004-11-01

    The Energy Design Guidelines for High Performance Schools--Arctic and Subarctic Climates provides school boards, administrators, and design staff with guidance to help them make informed decisions about energy and environmental issues important to school systems and communities. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school in arctic and subarctic climates. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs.

  12. Energías renovables y desarrollo económico. Un análisis para España y las grandes economías europeas

    Directory of Open Access Journals (Sweden)

    María Ángeles Caraballo Pou

    2017-01-01

    Full Text Available Antecedentes: Este trabajo evalúa la sostenibilidad del modelo de desarrollo económico español en el periodo 1980-2010. Asimismo, realiza un análisis comparativo con las grandes economías europeas: Alemania, Francia, Italia y Reino Unido.Metodología: Para alcanzar el objetivo del trabajo se han empleado técnicas de cointegración. Mediante estas técnicas se analiza la relación a largo plazo del consumo de energías renovables y no renovables con el desarrollo económico y la contaminación en el periodo 1980-2010. Tras un proceso de selección de variables, para España se ha utilizado el Producto Interno Bruto (PIB y la Formación Bruta de Capital, para medir el crecimiento, el Índice de Desarrollo Humano y el Capital Social, para el desarrollo, las emisiones de CO2 para la contaminación, el consumo de energía renovable en el sistema eléctrico y el consumo de petróleo para el consumo de energía renovable y no renovable, respectivamente. En segundo lugar, se han comparado los resultados obtenidos para la economía española con las cuatro economías más grandes de la Unión Europea: Alemania, Francia, Italia y Reino Unido. Dada la disponibilidad de datos, para estos países se ha excluido del análisis la Formación Bruta de Capital y el Índice de Desarrollo Humano.Resultados: En primer lugar, para los cinco países analizados se comprueba un impacto positivo del consumo de energía renovable y no renovable sobre el crecimiento y el desarrollo, con un impacto mayor de las energías no renovables. Para los tres países en los que se han incluido las emisiones de CO2 (España, Francia y Reino Unido, el efecto reductor de las renovables sobre las emisiones de CO2 es menor que el efecto contaminante de las no renovables. En segundo lugar, para España, Alemania y Francia se aprecia un proceso de retroalimentación entre el consumo de no renovables, el crecimiento y el desarrollo, que no se observa con el consumo de energ

  13. School Astronomy Club: from Project to Knowledge

    Science.gov (United States)

    Folhas, Alvaro

    2016-04-01

    Prepare a generation of young people for the challenges of the future is a task which forces us to rethink the school, not just for being difficult, but also because students feel that the school has very little to offer, especially something that interests them. Thus, the school is dysfunctional, is ill, and needs prompt treatment. School have to adjust to the new times, and this does not mean changing the old blackboards by advanced interactive whiteboards. The school has to find the way to the students with something that seduce them: the Challenge. The Astronomy Club that I lead in my school is essentially a Project space. Students who voluntarily joined the club, organize themselves according to their interests around projects whose outcome is not defined from the beginning, which requires them to do, undo and redo. Which obliges them to feel the need to ask for help to mathematics or physics to achieve answers, to feel the passion to study with a genuine purpose of learning. Some examples of the work: The younger students are challenged to reproduce the historical astronomical experiments that have opened the doors of knowledge such as the Eratosthenes experiment to determine the perimeter of the Earth (on equinox), or by using congruent triangles, determine the diameter the sun. These students are driven to establish distance scales in the solar system, which, to their astonishment, allows them to clear misconceptions that arise from some pictures of books and allows them to have a scientifically correct idea of the planetary orbit and distance separating the planets of the Solar System. For students from 15 to 18 years, I have to raise the level of the challenges and use the natural tendency of this age bracket to assert making new and exciting things. To this purpose, I am fortunate to have the support of large organizations like NUCLIO, ESA, CERN, and Go-Lab Project, Inspiring Science Education, Open Discovery Space and Global Hands on Universe. Through

  14. Wind Powering America's Wind for Schools Project: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.; Newcomb, C.

    2012-06-01

    This report provides an overview of the U.S. Department of Energy, Wind Powering America, Wind for Schools project. It outlines teacher-training activities and curriculum development; discusses the affiliate program that allows school districts and states to replicate the program; and contains reports that provide an update on activities and progress in the 11 states in which the Wind for Schools project operates.

  15. Fundraising Basics for Private School Facilities

    Science.gov (United States)

    Roach, Arthur H.

    2009-01-01

    This report examines the process behind setting up and implementing a "capital campaign": a program for raising money for new or renovated facilities at private K-12 schools. The report covers tax information regarding gifts to institutions then offers advice for setting up a comprehensive development program, including fundraising software and…

  16. Breathing Easier: HVAC Specifications for Schools.

    Science.gov (United States)

    Trent, C. Curtis; Trent, Warren C.

    1996-01-01

    A major source of indoor air contamination in schools originates within the heating, ventilating, and air-conditioning systems (HVAC), with draw-through systems being the worst offenders. Lists provisions for designing an HVAC system and a set of criteria to adhere to when planning new construction or renovations. (nine references) (MLF)

  17. Post Occupancy Evaluation of 23 Newly Renovated Apartments in Copenhagen

    DEFF Research Database (Denmark)

    Iqbal, Ahsan; Afshari, Alireza

    2016-01-01

    The present article is based on the post occupancy occupants’ perception of indoor air quality of recently renovated 23 residential apartments in Copenhagen. The apartments are equipped with novel mechanical ventilation systems. The apartments can be categorised in four, according to the design o...

  18. Energy Design Guidelines for High Performance Schools: Cool and Humid Climates

    Energy Technology Data Exchange (ETDEWEB)

    None

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans,

  19. Energy Design Guidelines for High Performance Schools: Hot and Humid Climates

    Energy Technology Data Exchange (ETDEWEB)

    None

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans,

  20. Energy Design Guidelines for High Performance Schools: Temperate and Humid Climates

    Energy Technology Data Exchange (ETDEWEB)

    None

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans,

  1. Energy Design Guidelines for High Performance Schools: Cool and Dry Climates

    Energy Technology Data Exchange (ETDEWEB)

    None

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans,

  2. Energy Design Guidelines for High Performance Schools: Hot and Dry Climates

    Energy Technology Data Exchange (ETDEWEB)

    None

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans,

  3. Energy Design Guidelines for High Performance Schools: Cold and Humid Climates

    Energy Technology Data Exchange (ETDEWEB)

    None

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans,

  4. Energy Design Guidelines for High Performance Schools: Temperate and Mixed Climates

    Energy Technology Data Exchange (ETDEWEB)

    None

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans,

  5. CEBAF Control Room Renovation

    International Nuclear Information System (INIS)

    Michael Spata; Anthony Cuffe; Thomas Oren

    2005-01-01

    The Machine Control Center (MCC) at Jefferson Lab's Continuous Electron Beam Accelerator Facility (CEBAF) was constructed in the early 1990s and based on proven technology of that era. Through our experience over the last 15 years and in our planning for the facilities 12 GeV upgrade we reevaluated the control room environment to capitalize on emerging visualization and display technologies and improve on work-flow processes and ergonomic attributes. The renovation was performed in two phases during the summer of 2004, with one phase occurring during machine operations and the latter, more extensive phase, occurring during our semi-annual shutdown period. The new facility takes advantage of advances in display technology, analog and video signal management, server technology, ergonomic workspace design, lighting engineering, acoustic ceilings and raised flooring solutions to provide a marked improvement in the overall environment of machine operations

  6. Financing School Capital Projects in New York State.

    Science.gov (United States)

    Howe, Edward T.

    1990-01-01

    Financing school capital projects in New York State is a responsibility involving both local school districts and the state government. State building aid is provided through an aid ratio and approved expenditure formula. This formula has an equalizing effect among districts by explicitly providing an aid amount inversely proportional to property…

  7. Methodology for Project Governence in CURS

    OpenAIRE

    Hribovšek, Anja

    2010-01-01

    Rare are organizations that haven’t met with project way of work yet. This also applies to government bodies. The degree addresses two areas which are very important for organizations that want to maintain control over costs, risk, functionality and complexity of a project. The first area is project management and the second area is system development process. The main purpose of the degree is to execute a complete analysis on both mentioned areas and to prepare or to renovate the met...

  8. Report of year 2000 version on basic study for promotion of joint implementation. Energy conservation by renovation of reheating furnace at 'SIDEX' S.A. Galati Steel Plant, Romania

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The purpose of this project is to perform a feasibility study on energy conservation by renovation of reheating furnace at 'SIDEX' S.A. Galati Steel Plant, and discuss the possibility of the future joint implementation project. This project is intended to contribute to reduction in greenhouse effect gas emission in Romania through energy conservation in industries, and introduction of the Japanese energy saving technologies. Furthermore, this project would be capable of contributing to modernization of the industries to achieve sustainable economic growth in Romania, where the joint implementation will be performed in the future. The fuel consumption per ton in the conventionally used reheating furnaces is actually about three times as much as in the same furnaces in Japan. Speaking of electric power consumption, it is about four times as much. The renovation will result in reduction of fuel consumption to the same level as in steel mills in Japan. This will reduce the import of natural gas by 59 million Nm{sup 3} annually after the project will have been implemented, and reduction is expected in CO2 of about 170,000 tons (on the basis of conversion to petroleum). The second effect is reduction of oxidation scale on surfaces of steel products generated in the furnaces at 3% or more presently to about 1%, which corresponds to steel products of more than 20,000 tons. (NEDO)

  9. The pedagogical and ethical legacy of a "successful" educational reform: The Citizen School Project

    Science.gov (United States)

    Fischman, Gustavo E.; Gandin, Luis Armando

    2016-02-01

    The Citizen School Project (Escola Cidadã) was implemented from 1993 to 2004 in Porto Alegre, capital of the Brazilian state of Rio Grande do Sul. This article presents the conception behind the Citizen School Project, the basic mechanisms created to implement and evaluate its strengths and weaknesses, and some of its contradictions. After contextualising the educational reforms in Brazil during the 1980s and 1990s, the authors demonstrate how the Citizen School Project's emphasis on participation and democratisation was a radical departure from Brazil's traditional public education system. Next, they present the three main goals and structures of the Citizen School Project - democratisation of access to schools, democratisation of schools' administration, and democratisation of access to knowledge. They conclude by discussing some pedagogic, social and political dynamics which appear to be strong legacies of this pedagogical project. The authors also argue that the Citizen School Project has both improved the quality of education in Porto Alegre and is an important contribution to our collective thinking about the politics of "successful" educational policies.

  10. Alberta High School, College Elevate Learning with Rare Joint Venture

    Science.gov (United States)

    Pearson, George

    2012-01-01

    The refusal by a group of parents in Olds, Alberta, in 2003 to accept a provincial grant to renovate their high school set in motion a remarkable collaboration that spawned an innovative learning campus for an entire community and beyond. The new Olds High School, which opened in 2010, is part of a new Community Learning Campus (CLC), a joint…

  11. Evaluation of the Family/School Partnership Project, Year III, 1996-97.

    Science.gov (United States)

    Kester, Donald L.; Plakos, John; Santos, Will

    The report details the third-year evaluation of a transitional bilingual education project at Chester W. Nimitz Middle School in Huntington Park, California. The Family/School Partnership Project is designed to assist limited English proficient students in mastering English skills to transition to regular classroom activities by integrating…

  12. Estimación del potencial de energías renovables en el estado de Sonora

    Directory of Open Access Journals (Sweden)

    Jorge Luis Taddei Bringas

    2016-06-01

    Full Text Available La etapa de uso de combustibles fósiles está llegando a su fin, debido principalmente a la escasez y problemas de contaminación que originan. En la actualidad existe una marcada tendencia en aprovechar las fuentes renovables de energía, por su bajo impacto ambiental y menor emisión de gases de efecto invernadero (GEI, lo cual contribuye a independizar las políticas energéticas locales de las del mercado global, basadas en la supremacía petrolera. Para obtener el mayor provecho de las energías renovables, es importante determinar el potencial de los distintos recursos energéticos existentes en una región. En este trabajo se presenta una relación del potencial para explotar energías renovables en el estado de Sonora, México, como un paso previo para establecer acciones y políticas que busquen su posible utilización a gran escala.

  13. Economic efficiency of high-rise construction in the Moscow program of renovation of housing stock

    Science.gov (United States)

    Misailovov, Andrey

    2018-03-01

    The article considers a new initiative of the regional authorities of updating the housing stock designated as the renovation of housing. Its main aspects are analyzed, including the nature of program, economic efficiency of its implementation due to high-rise construction and the regulatory and legislative framework, the procedure for implementing the program, and the time frame for its implementation. The role of the program for regions in which high depreciation of the housing stock is combined with a limited number of sites for a new housing construction is disclosed. The high-rise construction in the renovation program is presented as a variant of a successful solution not only of the tasks of renovating the housing stock, but also of filling the regional budget. The social and economic orientation of the high-rise construction and the involvement of residents in the process of making town-planning decisions in the field of high-rise construction at all stages of implementing the program are shown.

  14. Application of project management in technology improvement of Qinshan III

    International Nuclear Information System (INIS)

    Liu Xiaonian

    2008-01-01

    During the operation of Qinshan III, many engineering modifications and renovation projects are being carried out. Advanced international project management methodologies accustomed to the policy and organizational characteristics of TQNPC were applied to the management of these projects. After practical application and development of these methodologies, the company finally sets up its own classification of project management system. The project management system is introduced and discussed for its evolving direction in this paper. (authors)

  15. Overheating risk barriers to energy renovations of single family houses

    DEFF Research Database (Denmark)

    Psomas, Theofanis Ch.; Heiselberg, Per Kvols; Duer, Karsten

    2016-01-01

    Highlights •Energy renovations of houses in moderate climates increase overheating risk. •Critical measures are the floor insulation and the improvement of the airtightness. •Decrease of the g value of windows diminishes the intensity and the period of it. •Static method of assessment shows highe...

  16. Revision of documents guide to obtain the renovation of licence of the nuclear power plant of Laguna Verde, Units I and II

    International Nuclear Information System (INIS)

    Jarvio C, G.; Fernandez S, G.

    2008-01-01

    Unquestionably the renovation of license of the nuclear power plants , it this converting in a promising option to be able to gather in sure, reliable form and economic those requests about future energy in the countries with facilities of this type. This work it analyzes four documents guide and their application for the determination of the renovation of it licenses in nuclear plants that will serve of base for their aplication in the Nuclear Power Plant of Laguna Verde Units I and 2. The four documents in question are: the one Inform Generic of Learned Lessons on the Aging (NUREG - 1801), the Standard Revision Plan for the Renovation of License (NUREG - 1800), the Regulatory Guide for Renovation of License (GR-1.188), and the NEI 95-10, developed by the Institute of Nuclear Energy that is an Industrial Guide to Implement the Requirements of the 1OCFR Part 54-the Rule of Renovation of It licenses. (Author)

  17. Wind for Schools: A Wind Powering America Project

    Science.gov (United States)

    US Department of Energy, 2007

    2007-01-01

    The U.S. Department of Energy's (DOE's) Wind Powering America program (based at the National Renewable Energy Laboratory) sponsors the Wind for Schools Project to raise awareness in rural America about the benefits of wind energy while simultaneously educating college seniors regarding wind energy applications. The three primary project goals of…

  18. Intercultural Education in Primary School: A Collaborative Project

    Science.gov (United States)

    Santos, Marta; Araújo e Sá, Maria Helena; Simões, Ana Raquel

    2014-01-01

    In this article, we present and discuss a collaborative project on intercultural education developed by a group of educational partners. The group was made up of 12 people representing different institutions in the community, namely primary schools, cultural and social associations and the local council. The project takes an intercultural approach…

  19. Conceptual design report: Nuclear materials storage facility renovation. Part 7, Estimate data

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL's weapons research, development, and testing (WRD ampersand T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL's inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This report is organized according to the sections and subsections outlined by Attachment III-2 of DOE Document AL 4700.1, Project Management System. It is organized into seven parts. This document, Part VII - Estimate Data, contains the project cost estimate information

  20. Conceptual design report: Nuclear materials storage facility renovation. Part 7, Estimate data

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This report is organized according to the sections and subsections outlined by Attachment III-2 of DOE Document AL 4700.1, Project Management System. It is organized into seven parts. This document, Part VII - Estimate Data, contains the project cost estimate information.

  1. Astronomy Education Project for Guangdong High Schools F. P. Pi ...

    Indian Academy of Sciences (India)

    School of Physics and Electronic Engineering, Guangzhou University, ... an astronomy education project for high school teachers and students was initiated ... ipality, universities and research institutes, professional and amateur astronomical.

  2. Service-learning and learning communities: two innovative school projects that are mutually enriched

    Directory of Open Access Journals (Sweden)

    Carmen ÁLVAREZ ÁLVAREZ

    2015-12-01

    Full Text Available This article reflects on the interrelationships that exist between two educational projects of today: service-learning (ApS and learning communities (CdA. The ApS is an educational methodology applied worldwide where a single project combines a learning based on experience with the implementation of a service to the community. CdA is a school transformation project to achieve that the information society does not exclude any person, constituting a reality in more than one hundred and ninety schools in Spain and Latin America. Between the two, it is possible to show differences, especially in what refers to its theoretical substrates, but in actual teaching practice in schools there is some harmony, particularly in the so closely that they cultivate both projects with the school community. Therefore, we conclude that service-learning and learning communities can occur as two innovative and relevant today projects which can be mutually enriching: because for both the approach school-community-environment and volunteering is essential.

  3. Applications of the renewable energies; Aplicaciones de las energias renovables

    Energy Technology Data Exchange (ETDEWEB)

    Gomez Rocha, Luis Martin [Comision Nacional para el Ahorro de Energia, Mexico, D.F. (Mexico)

    2001-07-01

    The solar energy manifests itself in different forms and its application has been fundamental for the humankind development. These forms are known as renewable energies, since they are energy forms that are renewed or remade with time or that are so abundant on Earth, that they will last for hundreds or thousands of years, either we use them or not. The main advantage of the utilization of the renewable energies in comparison with hydrocarbons is the one of having smaller impact on the environment, which brings about the conservation of nonrenewable resources, and to postpone its exhaustion. They allow the distributed generation, diminishing the power losses in the transmission and distribution systems, which increases the overall efficiency. In addition they can be the drive for regional development and generation of employment, because when having applications in remote zones and being a field still not completely developed in Mexico, the possibility exists of enabling professionals and technicians. From the point of view of the power sector, the renewable energies extend the supply and availability of energy, making more flexible and independent the operation and reliability of the national power system. [Spanish] La energia solar se manifiesta de diversas formas y su aplicacion ha sido fundamental para el desarrollo de la humanidad. A estas formas se les conoce como energias renovables, ya que son formas de energia que se van renovando o rehaciendo con el tiempo o que son tan abundantes en la tierra, que perduraran por cientos o miles de anos, las usemos o no. La principal ventaja del aprovechamiento de las energias renovables en comparacion con los hidrocarburos es la de tener menor impacto al medio ambiente, lo que trae consigo la conservacion de recursos no renovables, y posponer su termino. Permiten la generacion distribuida, disminuyendo las perdidas energeticas en los sistemas de transmision y distribucion, lo que incrementa la eficiencia general. Ademas

  4. Energy Renovation of a Typical Danish Single-family House

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Svendsen, Svend

    2007-01-01

    In 2006, new tighter energy performance requirements were introduced in Denmark for both new buildings and renovation, including a new classification system for low energy buildings. These demands are based on the directive on Energy Performance of Buildings, the EPBD (2002/91/EC). In general the...... available on the internet: http://www.rwsc.dk/EP_Villa_Projektrapport_RW_DK/main_report_villa.pdf....

  5. Aprovechamiento de recursos renovables en la obtención de nuevos materiales

    Directory of Open Access Journals (Sweden)

    Sandra Liliana Gómez Ayala

    2018-02-01

    Full Text Available La producción de plásticos a nivel mundial presenta cifras abrumadoras debido a que tienen aplicaciones en diferentes campos, desde la medicina hasta la industria de empaques. Uno de los problemas radica en que la materia prima para preparar esos plásticos proviene de fuentes fósiles, los principales responsables de las emisiones de dióxido de carbono a la atmósfera y después de usar esos materiales se desechan y tardan varios años en descomponerse. Otro problema está enfocado hacia la agricultura e incluye los procesos que generan desechos orgánicos como la industria azucarera y del café, que pueden contaminar el medio ambiente sin tratamiento adecuado. Cada vez cobra más importancia reemplazar los plásticos convencionales por biomateriales cuyos sustratos de partida provengan de fuentes renovables, que sean biodegradables y que puedan tener aplicaciones similares a los materiales convencionales. Por ello, en este artículo se destacan los últimos avances en el área de los materiales a partir de recursos renovables, en especial de los polímeros biobasados, de su biodegradabilidad y sus aplicaciones, para generar curiosidad y propiciar la búsqueda de alternativas de aprovechamiento de las fuentes renovables en la obtención de nuevos biopolímeros.

  6. Students' Perceptions of Life Skill Development in Project-Based Learning Schools

    Science.gov (United States)

    Meyer, Kimberly; Wurdinger, Scott

    2016-01-01

    This research aimed to examine students' perceptions of their life skills while attending project-based learning (PBL) schools. The study focused on three questions including: (1) What are students' perceptions of their development of life skills in project-based learning schools?; (2) In what ways, if any, do students perceive an increase in…

  7. Boundary Crossing in R&D Projects in Schools: Learning through Cross-Professional Collaboration

    Science.gov (United States)

    Schenke, Wouter; van Driel, Jan; Geijsel, Femke P.; Volman, Monique L. L.

    2017-01-01

    Background/Context: School leaders, teachers, and researchers are increasingly involved in collaborative research and development (R&D) projects in schools, which encourage crossing boundaries between the fields of school and research. It is not clear, however, what and how professionals in these projects learn through cross-professional…

  8. Patient satisfaction is biased by renovations to the interior of a primary care office: a pretest-posttest assessment.

    Science.gov (United States)

    Tièche, Raphaël; da Costa, Bruno R; Streit, Sven

    2016-08-11

    Measuring quality of care is essential to improve primary care. Quality of primary care for patients is usually assessed by patient satisfaction questionnaires. However, patients may not be able to judge quality of care without also reflecting their perception of the environment. We determined the effect that redesigning a primary care office had on patient satisfaction. We hypothesized that renovating the interior would make patients more satisfied with the quality of medical care. We performed a Pretest-Posttest analysis in a recently renovated single-practice primary care office in Grenchen, Switzerland. Before and after renovation, we distributed a questionnaire to assess patient satisfaction in four domains. We chose a Likert scale (1 = very poor to 6 = very good), and 12 quality indicators, and included two consecutive samples of patients presenting at the primary care office before (n = 153) and after (n = 153) interior design renovation. Response rate was high (overall 85 %). The sample was similar to the enlisted patient collective, but the sample population was older (60 years) than the collective (52 years). Patient satisfaction was higher for all domains after the office was renovated (p patient satisfaction, including satisfaction in domains otherwise unchanged. Physician skills and patient satisfaction sometimes depend on surrounding factors that may bias the ability of patients to assess the quality of medical care. These biases should be taken into account when quality assessment instruments are designed for patients.

  9. Project on School Staff Health Promotion in Poland: The First Experiences

    Science.gov (United States)

    Woynarowska-Soldan, Magdalena

    2015-01-01

    Purpose: The purpose of this paper is to present the concept, methods of implementation, results and experiences from the first stage of the three-year project on school staff health promotion carried out within the framework of the health-promoting school (HPS) network in Poland. Design/methodology/approach: The project was implemented in 2012 in…

  10. Effectiveness of energy renovations : a reassessment based on actual consumption savings

    NARCIS (Netherlands)

    Filippidou, F.; Nieboer, N.E.T.; Visscher, H.J.

    2018-01-01

    Energy renovations offer unique opportunities to increase the energy efficiency of the built environment and for the existing housing stock; they are the most important solution. Usually, energy savings are based on modeling calculations. However, recent research has shown that the predicted

  11. Roof renovation of buildings 128 and 129

    CERN Multimedia

    2015-01-01

    The roof renovation of buildings 128 and 129 is scheduled to take place from 17 August to 15 October 2015.   During this period, access to the "raw material" workshop will be limited and controlled due to asbestos removal. Collecting your orders directly from the building will be difficult, or even impossible, and urgent requests will be difficult to carry out. We therefore ask you to create your requests via EDH, so that delivery may be carried out as soon as possible. Thank you for your understanding. GS Department

  12. "KiDS and Diabetes in Schools" project: Experience with an international educational intervention among parents and school professionals.

    Science.gov (United States)

    Bechara, Glaucia Margonari; Castelo Branco, Fernanda; Rodrigues, Avelino Luiz; Chinnici, Daniela; Chaney, David; Calliari, Luis Eduardo P; Franco, Denise Reis

    2018-06-01

    Although it is known that school care is a major challenge in diabetes treatment, there is still no published international initiative. The aims of this study were to introduce an international educational intervention tool, the International Diabetes Federation (IDF) KiDS and Diabetes in Schools project (KiDS project), and to describe its impact on diabetes knowledge and behavior of caregivers and school professionals. The KiDS project was developed with the support of IDF and the International Society for Pediatric and Adolescent Diabetes and provides online free material in 10 languages, directed to caregivers and school personnel. A pilot evaluation of the KiDS intervention was performed in Brazil. An educational intervention was conducted in 5 primary schools, with 42 parents and school staff, followed by 2 individual interviews after 1 and 3 months. The results were evaluated in a qualitative study with a descriptive design based on content analysis. School staff acquired new knowledge on diabetes and its treatment. They felt more confident when helping students with diabetes and said the educational intervention promoted a positive impact on the teacher-student relationship, on the caring for health, and on school infrastructure. Family members of children with diabetes stated that the educational intervention gave them an opportunity to strengthen and update information on treatment and improve their knowledge. The KiDS project is the first international tool directed to foster a safe and supportive environment and a better understanding of diabetes in schools. In this pilot evaluation, it achieved the goal of informing and changing the behavior of parents and school staff, thus improving the care provided to children with diabetes in schools. © 2018 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  13. School Indoor Air Quality Best Management Practices Manual.

    Science.gov (United States)

    Hall, Richard; Ellis, Richard; Hardin, Tim

    This manual, written in response to requirements of the Washington State legislature, focuses on practices which can be undertaken during the siting, design, construction, or renovation of a school, recommends practices to help ensure good indoor air quality during building occupancy, and suggests protocols and useful reference documents for…

  14. Energy renovation of single-family houses in Denmark utilising long-term financing based on equity

    DEFF Research Database (Denmark)

    Kragh, Jesper; Rose, Jørgen

    2011-01-01

    This paper aims to present an economic overview of the opportunities for energy renovation of single-family houses in Denmark financed over the long term. The paper focuses on the economic difference between energy savings and the repayment of investment. Taking out the average remaining 20% equity...... in long-term property mortgage loans and utilising it for extensive energy renovation improves both the economy and the extent of included measures. Approximately 30% of energy consumption in Denmark is used for space heating. The existing 1 million single-family houses account for approximately half...

  15. Possible financing schemes for one-stop-shop service for sustainable renovation of single-family houses

    DEFF Research Database (Denmark)

    Mahapatra, Krushna; Gustavsson, Leif; Haavik, Trond

    energy use behaviour of the occupants and the difficulty to predict future energy prices. The options to finance energy efficiency renovations include homeowners’ own resources, mortgage refinancing, flex loan, personal loan, financing by service providers, preferential loan, subsidies/grants, credit...... for the homeowners, and banks will have a less risky asset in their portfolio. In situations where homeowners cannot avail additional mortgage financing, e.g. those who recently purchased a house and used the limit to such loans, banks may consider an energy efficient renovation plan prepared by an entrepreneur...

  16. Mobilization for energy renovation. Preliminary results of a survey on rational and heuristic thinking of the dwellers.

    OpenAIRE

    Taranu, Victoria; Verbeeck, Griet

    2016-01-01

    Mobilization for energy renovation. The commonly used policies to encourage the uptake of energy efficient measures in renovations are mostly based on monetary incentives and information provision. Both these approaches have the underlying assumption that dwellers act exclusively as rational homo economicus, who has unlimited intellectual capabilities to calculate long term ROI. However, recent findings show evidence that people have bounded rationality and bounded willpower. A survey was...

  17. Cost-effective infrastructure choices in education: Location, build or repair

    Directory of Open Access Journals (Sweden)

    Glenn P Jenkins

    2015-03-01

    Full Text Available The purpose of this study is to develop a model to arrive at a joint optimising strategy for capital budgeting for the construction of new school buildings and for the renovation of existing schools. This model provides a practical tool for ranking construction projects so as to yield the maximum positive impact on the education system. A key aspect of the model is that it provides the optimal mix of renovation and new construction that should be undertaken under a fixed budget constraint.The model is applied to a sample dataset from the education sector of Limpopo province, South Africa, in order to quantify the benefits of using the model. The benefits from using this model for decision making on the evaluation of new and renovation investments in school infrastructure is estimated to increase the effectiveness of these investments by up to 300 percent over the counterfactual system for making these decisions.

  18. Instalación eléctrica de una vivienda unifamiliar aislada mediante suministro de energías renovables

    OpenAIRE

    LOZANO VALLADOLID, FERNANDO

    2015-01-01

    [ES] Instalación eléctrica con grado de electrificación elevada de una vivienda unifamiliar aislada mediante suministro de energías renovables (solar, eólica, geotérmicas). Lozano Valladolid, F. (2015). Instalación eléctrica de una vivienda unifamiliar aislada mediante suministro de energías renovables. http://hdl.handle.net/10251/58751. TFGM

  19. Conceptual design report: Nuclear materials storage facility renovation. Part 3, Supplemental information

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL's weapons research, development, and testing (WRD ampersand T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL's inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. It is organized into seven parts. Part I - Design Concept describes the selected solution. Part III - Supplemental Information contains calculations for the various disciplines as well as other supporting information and analyses

  20. Energy renovation services for single-family houses. Generalization and challenges of the one-stop-shop service model; Pientalojen energiaremonttipalvelut. Kokonaispalvelumallin yleistyminen ja sen haasteet

    Energy Technology Data Exchange (ETDEWEB)

    Paiho, S.; Kuusisto, J.; Stenlund, O.; Ala-Juusela, M.

    2012-08-15

    provider varies from an energy company to a renovation company or a hardware store. The big challenge is, how service can be kept high-quality and independent, while maintaining and developing partners' and customers' trust. Before a full service can be provided, one has to think of marketing and market differentiation. One possible channel is the Internet, because it is ideal for information-sharing of technologies, solutions and demonstration projects. One can also share experiences online. This publication describes how the Internet could be utilized for marketing and selection of the energy renovation services. (orig.)

  1. Conceptual design report: Nuclear materials storage facility renovation. Part 6, Alternatives study

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL's weapons research, development, and testing (WRD ampersand T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL's inability to ship any materials offsite because of the lack of receiver sites for material and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This report is organized according to the sections and subsections outlined by Attachment 111-2 of DOE Document AL 4700.1, Project Management System. It is organized into seven parts. This document, Part VI - Alternatives Study, presents a study of the different storage/containment options considered for NMSF

  2. Schools water efficiency and awareness project | Wilson | Water SA

    African Journals Online (AJOL)

    The City of Cape Town's Water Demand Management (WDM) department has been involved in school projects for several years, although these have generally been restricted to educational activities during Water Week and school competitions, due mainly to limited resources. Cape Town is a water scarce area, and ...

  3. Trusses Of Tensegrity Type In A Concept Of Train Station Renovation In Żary

    Directory of Open Access Journals (Sweden)

    Lechocka Paulina

    2015-09-01

    Full Text Available The first railway station in Żary was built in 1843 in Germany. After the Second World War and years of socialism in Poland the meaning of railway decreased and its technical condition deteriorated. Now the building needs renovation and change of function. Tensegrity structures may be useful in renovation of platforms shelter. They are strut and tie construction, in which there is self-stabilization between compressed and tensioned elements. Conception of new platform shelter is based on exemplary tensegrity module consist of three struts and nine cables (called „Simplex”. Tensegrity would make railway station more modern, but not cover its original elevation.

  4. Curricular renovation in the phonoaudiology program of the University of Cauca: a proposal for educational quality

    Directory of Open Access Journals (Sweden)

    Liliana María Pérez-Tenorio

    2010-09-01

    Full Text Available In Colombia, the Superior Education is going through a transformation process. These changes must be in coherence with the formulation of flexible policies among the diverse components of the curriculum and with the need for new forms of working and producing knowledge. The curricular renovation must ref lect an educational quality compromise and contribute to generate human development with high social impact. This article presents a proposal for Curricular Renovation, elaborated by faculty and students of the Phonoaudiology Program of the University of Cauca. This document contains aspects related to the pedagogic model, didactics, faculty-student relation, systems of evaluation and plan of studies. Furthermore, in this document the bases for the Route of Curricular Renovation are presented, consisting of the following phases: background, diagnosis and operational plan. These should facilitate the academic integration for adjusting the curricular processes to the needs of the academic program in a local, national and international context.

  5. Decision Support Model for Mosque Renovation and Rehabilitation (Case Study: Ten Mosques in Jakarta Barat, Indonesia)

    Science.gov (United States)

    Utama, D. N.; Triana, Y. S.; Iqbal, M. M.; Iksal, M.; Fikri, I.; Dharmawan, T.

    2018-03-01

    Mosque, for Muslim, is not only a place for daily worshipping, however as a center of culture as well. It is an important and valuable building to be well managed. For a responsible department or institution (such as Religion or Plan Department in Indonesia), to practically manage a lot of mosques is not simple task to handle. The challenge is in relation to data number and characteristic problems tackled. Specifically for renovating and rehabilitating the damaged mosques, a decision to determine the first damaged mosque priority to be renovated and rehabilitated is problematic. Through two types of optimization method, simulated-annealing and hill-climbing, a decision support model for mosque renovation and rehabilitation was systematically constructed. The method fuzzy-logic was also operated to establish the priority of eleven selected parameters. The constructed model is able to simulate an efficiency comparison between two optimization methods used and suggest the most objective decision coming from 196 generated alternatives.

  6. 'Plus Energy School Rostock'; 'Plus Energieschule Rostock'

    Energy Technology Data Exchange (ETDEWEB)

    Roemhild, Thomas; Wollensak, Martin [Hochschule Wismar (Germany). Inst. fuer Gebaeude Energie und Lichtplanung

    2011-07-01

    In Rostock Reutershagen should students learn in the future instead of in three different school sites in one school building; central energetically renovated and extended. The school is expected to reach the Plus Energy Standard, so there will be produced more energy than the building needs throughout the year. So far, the school consisted of a main building and two outbuildings. In future remains only the main building, the building shell is energetically renovated. The building incorporates a ventilation system. In addition two new buildings will be erected separated. The area between the buildings is provided with a transparent cover and used as an unheated intermediate climatic zone. The energy concept is based on the reduction of requirements. The supply of heat is effected by distance heating, the supply with electricity comes from the grid. The substitution is made by photovoltaic, an ORC system and by using wind energy. The innovative design of the new outer shell, including the existing external components, and the use of efficient building technologies leads to a maximum reduction of energy demand while expanding the possibilities of use. (orig.)

  7. Build, renovate and invest economically - Efficiency and economic viability in harmony

    International Nuclear Information System (INIS)

    Meier, R.; Beck, M.; Previdoli, P.

    2002-01-01

    This book presents 13 papers that provide the latest know-how on energy economics in the building area. The authors show the importance of information and knowledge transfer when using new energy technologies. The topics covered include the role of the Swiss research programme on energy economy fundamentals, indicator systems for sustainability factors and energy characteristics of buildings. Also a discussion of the question 'rebuild or renovate', as well a series of articles about low-flow mechanical ventilation and the marketing of low-energy consumption building concepts are presented. Further articles cover the marketing of thermal solar systems as well as technology dissemination and monitoring. Also, the marginal costs of energy efficiency measures and the potential for energy savings and environmental management in trade and industry are discussed. Finally, two papers deal with the application of Swiss SIA building standards as well as technical developments and energy efficiency in the building and renovation areas

  8. University-Level Research Projects for High School Students

    Science.gov (United States)

    McConnell, Mark L.

    2000-01-01

    The goal of this project was to provide an opportunity for high school students to participate in university-level research projects. In this case, students from Pinkerton Academy (Derry, New Hampshire) were invited to participate in efforts to catalog data from the COMPTEL experiment on NASA's Compton Gamma-Ray Observatory (CGRO). These activities were part of a senior level honors course at Pinkerton. Although the success of this particular program was rather limited, we feel that the general concept is a sound one. In principle, the concept of partnerships between local schools and university researchers is one that could be especially attractive to soft money researchers. Programs can be carefully designed to benefit both the students and the research program.

  9. An Agile Constructionist Mentoring Methodology for Software Projects in the High School

    Science.gov (United States)

    Meerbaum-Salant, Orni; Hazzan, Orit

    2010-01-01

    This article describes the construction process and evaluation of the Agile Constructionist Mentoring Methodology (ACMM), a mentoring method for guiding software development projects in the high school. The need for such a methodology has arisen due to the complexity of mentoring software project development in the high school. We introduce the…

  10. The Maui's Dolphin Challenge: Lessons from a School-Based Litter Reduction Project

    Science.gov (United States)

    Townrow, Carly S.; Laurence, Nick; Blythe, Charlotte; Long, Jenny; Harré, Niki

    2016-01-01

    The Maui's Dolphin Challenge was a litter reduction project that was run twice at a secondary school in Aotearoa New Zealand. The project drew on a theoretical framework encompassing four psycho-social principles: values, embodied learning, efficacy, and perceived social norms. It challenged students to reduce the litter at the school by offering…

  11. Inclusive design in the implementation of projects for schools modernization in Portugal - case studies.

    Science.gov (United States)

    Lopes, Lígia; Aguiar, Carlos; da Silva, Fernando Moreira

    2012-01-01

    The Project for Schools Modernization taking place in Portugal, with an estimated total investment of 2450 million for the intervention in the first 205 schools, provide the reclassification of 332 secondary schools by 2015. One of the questions we can pose is if the authorities and the teams of architects selected to design these schools considered fundamental for the correctness of architectural barriers within the school and its accessibility the implementation of standards and principles of inclusion of children/teenagers with special needs within their school environment. As most of the projects are already being implemented, the main aim of this paper is to present the outcomes of a comparative analysis and synthesis of six schools located in the northern part of the country. This analysis occurs from the of Participatory Design perspective which appeals to the experience of the disable children to look (or evaluate) the negative and positive factors in terms of physical space, interpreted by inclusive design rules and orientations. Therefore, the evaluation of schools modernization project, and its discussion, is central for the understanding how these children are addressed in projects which are directed at them.

  12. Massive financing of the energy transition - SFTE feasibility study: synthesis report, Energy renovation of public buildings

    International Nuclear Information System (INIS)

    2014-11-01

    The Energy Shift Financing Agency's (SFTE) project aims to establish a broad partnership between public and private entities to stimulate the economy and deliver between euros 180 bn and euros 420 bn of investment in Europe over 10 years for the benefit of medium-sized projects (in the order of euros 1 m) that are necessary for the energy transition. It will enable EU banks to finance the energy renovation of public buildings under excellent - cheap and long-term - conditions. A feasibility study has been conducted by the AFTER association with an exemplary consortium of public and private stakeholders in France: local authorities, industry players, banks/financial institutions, NGOs, Plan Batiment Durable. Many European institutions have expressed their interest in the initiative. Now the implementation of the SFTE project requires a commitment from European and national public authorities. Such a proactive real-estate policy would significantly contribute to economic recovery, cut costs, CO_2 emissions and the external deficit and improve energy independence, and could quickly create jobs. This document is the French version of the synthesis report of the SFTE project feasibility study. Two notes are attached to the document: one about the SFTE project adaptation to the Juncker's 315 bn euros investment plan, and the other about the selection of public buildings energy retrofitting in the Juncker plan and the French-German proposals

  13. Effect of renovating an office building on occupants' comfort and health

    DEFF Research Database (Denmark)

    Pejtersen, Jan; Brohus, H.; Hyldgaard, C. E.

    2001-01-01

    . Before the floor material was installed in the office building, a full-scale exposure experiment was performed in the laboratory. The new ventilation strategy and renovation of the HVAC system were selected on the basis of laboratory experiments on a full-scale mock-up of a cellular office. The severity...

  14. Conceptual design report: Nuclear materials storage facility renovation. Part 3, Supplemental information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. It is organized into seven parts. Part I - Design Concept describes the selected solution. Part III - Supplemental Information contains calculations for the various disciplines as well as other supporting information and analyses.

  15. Gobernanza global y evolución de las energías renovables en el sur. Objetivos políticos y estructuras de gobernanza

    OpenAIRE

    Wolfgang Hein; Daniela García Sánchez; Lars Holstenkamp

    2013-01-01

    El desarrollo de la gobernanza global de las energías renovables comparte similitudes y diferencias con otros sectores de la gobernanza global. La proliferación de organizaciones en el sector resalta el importante compromiso de varios actores con el fomento de energías renovables y, por otro lado, produce problemas de coordinación para alcanzar un efecto óptimo e influir sobre el avance de las energías renovables, particularmente en países en desarrollo.

  16. Energy renovation of Danish single-family houses Economy - barrier, motivation and limit

    DEFF Research Database (Denmark)

    Mortensen, Andrea; Heiselberg, Per Kvols; Plenge, Mary-Ann Knudstrup

    a large percentage who have not heard about the offers compared to the other income groups. There have been many reflections about energy saving initiatives and many of the initiatives have already been performed. There is however still a high number missing and particularly the depth of the renovation...... needs to be increased for Denmark to approach the defined objectives. The positive is that the listed tasks are predominantly carried out or considered to save energy, indicating that the homeowners are aware of this benefit. On the wish list presented to the homeowners, five wishes were selected.......000 DKK and 310.000DKK) are fair compared to the outcome, but when the needed investment is at 550.000 DKK and above, the majority think it is too expensive despite the benefits. The investment limit for the private renovations is defined on the basis on the homeowners’ interest in performing similar...

  17. The role of interfacial layers in the enhanced thermal conductivity of nanofluids: A renovated Hamilton-Crosser model

    International Nuclear Information System (INIS)

    Yu, W; Choi, S.U.S.

    2004-01-01

    We previously developed a renovated Maxwell model for the effective thermal conductivity of nanofluids and determined that the solid/liquid interfacial layers play an important role in the enhanced thermal conductivity of nanofluids. However, this renovated Maxwell model is limited to suspensions with spherical particles. Here, we extend the Hamilton--Crosser model for suspensions of nonspherical particles to include the effect of a solid/liquid interface. The solid/liquid interface is described as a confocal ellipsoid with a solid particle. The new model for the three-phase suspensions is mathematically expressed in terms of the equivalent thermal conductivity and equivalent volume fraction of anisotropic complex ellipsoids, as well as an empirical shape factor. With a generalized empirical shape factor, the renovated Hamilton--Crosser model correctly predicts the magnitude of the thermal conductivity of nanotube-in-oil nanofluids. At present, this new model is not able to predict the nonlinear behavior of the nanofluid thermal conductivity

  18. Solar Wind Monitor--A School Geophysics Project

    Science.gov (United States)

    Robinson, Ian

    2018-01-01

    Described is an established geophysics project to construct a solar wind monitor based on a nT resolution fluxgate magnetometer. Low-cost and appropriate from school to university level it incorporates elements of astrophysics, geophysics, electronics, programming, computer networking and signal processing. The system monitors the earth's field in…

  19. Gobernanza global y evolución de las energías renovables en el sur. Objetivos políticos y estructuras de gobernanza

    Directory of Open Access Journals (Sweden)

    Wolfgang Hein

    2013-10-01

    Full Text Available El desarrollo de la gobernanza global de las energías renovables comparte similitudes y diferencias con otros sectores de la gobernanza global. La proliferación de organizaciones en el sector resalta el importante compromiso de varios actores con el fomento de energías renovables y, por otro lado, produce problemas de coordinación para alcanzar un efecto óptimo e influir sobre el avance de las energías renovables, particularmente en países en desarrollo.

  20. 2017 NMC Technology Outlook for Nordic Schools A Horizon Project Regional Report

    DEFF Research Database (Denmark)

    2017-01-01

    research effort between the New Media Consortium (NMC) and the Norwegian Centre for ICT in Education to inform Nordic school leaders and decision-makers about significant developments in technologies supporting teaching, learning, and creative inquiry in primary and secondary education across Denmark......Adams Becker, S., Cummins, M., Freeman, A., and Rose, K. (2017). 2017 NMC Technology Outlook for Nordic Schools: A Horizon Project Regional Report. Austin, Texas: The New Media Consortium. The 2017 NMC Technology Outlook for Nordic Schools: A Horizon Project Regional Report reflects a collaborative...

  1. Portland Public Schools Project Chrysalis: Year 2 Evaluation Report.

    Science.gov (United States)

    Mitchell, Stephanie J.; Gabriel, Roy M.; Hahn, Karen J.; Laws, Katherine E.

    In 1994, the Chrysalis Project in Portland Public Schools received funding to prevent or delay the onset of substance abuse among a special target population: high-risk, female adolescents with a history of childhood abuse. Findings from the evaluation of the project's second year of providing assistance to these students are reported here. During…

  2. Collaborative School Innovation Project as a Pivot for Teachers' Professional Development: The Case of Acharnes' Second Chance School in Greece

    Science.gov (United States)

    Katsarou, Eleni; Tsafos, Vassilis

    2008-01-01

    A collaborative school innovation project is explored as a pivot for the professional development of the teachers involved. The Second Chance School (SCS) of Acharnes in Greece constitutes such a collaborative innovative project, regarding the underlying theory of multiliteracies, its decentralised character, respect for student individuality, and…

  3. Development of a method for holistic energy renovation

    DEFF Research Database (Denmark)

    Morelli, Martin

    recovery. The long-term performance of the renovation may be reduced due to mould growth behind the interior insulation or decay of the wooden beams. The energy saving potential in two multi-family buildings was investigated by parameter studies of existing energy saving measures for both the building....... Measurements of temperature and relative humidity showed that conditions for mould growth were present. However, no signs of mould growth were documented at dismantling of the interior insulation. A method was developed for the design of energy saving measures based on both Failure Mode and Effect Analysis...

  4. School Building Projects: Managing Insurance and Contracts during Construction

    Science.gov (United States)

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  5. Sarah J. Hale High School-Project SABER.

    Science.gov (United States)

    Rosenblatt, Harold

    Project SABER, which operated in Sarah J. Hale High School in South Brooklyn, New York, consisted of bilingual instructional and supportive services to 9th and 10th grade Spanish language students. Students received bilingual instruction in social studies, science, math, and Spanish. All the SABER students received English as a second language…

  6. High School Principals and School Reform: Lessons Learned from a Statewide Study of Project Re:Learning.

    Science.gov (United States)

    Anderson, Lorin W.; Shirley, J. Robert

    1995-01-01

    Summarizes a study examining the high school principal's role in providing the leadership needed to explore and implement Project Re:Learning. The 4-phase study initially included 15 schools and involved questionnaires, interviews, and shadowing. Identifies six types of administrators: the absent administrator, the pawn, the pragmatic principal,…

  7. IMPLANTACIÓN DE ENERGIAS RENOVABLES Y ESTIMACIÓN DE LA HUELLA DE CARBONO EN EL MUNICIPIO DE BLANCA (MURCIA

    Directory of Open Access Journals (Sweden)

    José Molina Ruiz

    2012-01-01

    Full Text Available La introducción del concepto de sostenibilidad en el mercado energético implica la potenciación de las energías renovables activando políticas que fomenten su implantación. El éxito de estas políticas se plasmará en el incremento de participación de las energías renovables en el mix energético, en la reducción de emisiones de CO2 y en el cumplimiento de los compromisos internacionales. Este trabajo analiza el grado de implantación de las energías renovables en un municipio de la Región de Murcia (Blanca, valorando la incidencia de la legislación sectorial energética y estimando la huella de carbono derivada del consumo de energía eléctrica.

  8. Implementation of a project-based engineering school: increasing student motivation and relevant learning

    Science.gov (United States)

    Terrón-López, María-José; García-García, María-José; Velasco-Quintana, Paloma-Julia; Ocampo, Jared; Vigil Montaño, María-Reyes; Gaya-López, María-Cruz

    2017-11-01

    The School of Engineering at Universidad Europea de Madrid (UEM) implemented, starting in the 2012-2013 period, a unified academic model based on project-based learning as the methodology used throughout the entire School. This model expects that every year, in each grade, all the students should participate in a capstone project integrating the contents and competencies of several courses. This paper presents the academic context under which this experience has been implemented, and a summary of the work done to design and implement the Project-Based Engineering School at the UEM. The steps followed, the structure used, some sample projects, as well as the difficulties and benefits of implementing the programme are discussed in this paper. The results are encouraging as students are more motivated and the initial set objectives were accomplished.

  9. Educating for Freedom and Responsibility: Lessons From the First Amendment Schools Project

    Science.gov (United States)

    Mitchell, Cynthia

    2016-01-01

    The First Amendment Schools project holds rich lessons in how to change school cultures into "laboratories of democracy"--as well as in how to increase the odds of success for any school reform effort. School reform programs of any sort need to make sure to build in sustainability, to provide ways to spread their lessons beyond the…

  10. The Western Primary School 'Quiet Room' Project.

    Science.gov (United States)

    King, Angus; Chantler, Zara

    2002-01-01

    This article describes a "Quiet Room" project for students with social, emotional, and behavioral problems at a British primary school. The Quiet Room was designed to provide a nurturing environment away from the classroom in which a child's emotional needs can be explored on a one-to-one basis. Benefits for children, parents, and…

  11. Techno-economic analysis of energy renovation measures for a district heated multi-family house

    International Nuclear Information System (INIS)

    Gustafsson, Marcus; Gustafsson, Moa Swing; Myhren, Jonn Are; Bales, Chris; Holmberg, Sture

    2016-01-01

    Highlights: • Energy saving measures can be cost-effective as part of a planned renovation. • Primary energy consumption, non-renewable energy consumption and CO_2 emissions are assessed for different electricity mixes. • EAHP can be a cost-effective and environmentally beneficial complement to district heating. • EAHP has lower LCC and significantly shorter payback time than ventilation with heat recovery. • Low-temperature ventilation radiators improve the COP of the heat pump. - Abstract: Renovation of existing buildings is important in the work toward increased energy efficiency and reduced environmental impact. The present paper treats energy renovation measures for a Swedish district heated multi-family house, evaluated through dynamic simulation. Insulation of roof and façade, better insulating windows and flow-reducing water taps, in combination with different HVAC systems for recovery of heat from exhaust air, were assessed in terms of life cycle cost, discounted payback period, primary energy consumption, CO_2 emissions and non-renewable energy consumption. The HVAC systems were based on the existing district heating substation and included mechanical ventilation with heat recovery and different configurations of exhaust air heat pump. Compared to a renovation without energy saving measures, the combination of new windows, insulation, flow-reducing taps and an exhaust air a heat pump gave up to 24% lower life cycle cost. Adding insulation on roof and façade, the primary energy consumption was reduced by up to 58%, CO_2 emissions up to 65% and non-renewable energy consumption up to 56%. Ventilation with heat recovery also reduced the environmental impact but was not economically profitable in the studied cases. With a margin perspective on electricity consumption, the environmental impact of installing heat pumps or air heat recovery in district heated houses is increased. Low-temperature heating improved the seasonal performance factor of the

  12. Composition of heavy metals and airborne fibers in the indoor environment of a building during renovation.

    Science.gov (United States)

    Latif, Mohd Talib; Baharudin, Nor Hafizah; Velayutham, Puvaneswary; Awang, Normah; Hamdan, Harimah; Mohamad, Ruqyyah; Mokhtar, Mazlin B

    2011-10-01

    The renovation of a building will certainly affect the quality of air in the vicinity of where associated activities were undertaken, this includes the quality of air inside the building. Indoor air pollutants such as particulate matter, heavy metals, and fine fibers are likely to be emitted during renovation work. This study was conducted to determine the concentration of heavy metals, asbestos and suspended particulates in the Biology Building, at the Universiti Kebangsaan, Malaysia (UKM). Renovation activities were carried out widely in the laboratories which were located in this building. A low-volume sampler was used to collect suspended particulate matter of a diameter size less than 10 μm (PM₁₀) and an air sampling pump, fitted with a cellulose ester membrane filter, were used for asbestos sampling. Dust was collected using a small brush and scope. The concentration of heavy metals was determined through the use of inductively coupled plasma-mass spectroscopy and the fibers were counted through a phase contrast microscope. The concentrations of PM₁₀ recorded in the building during renovation action (ranging from 166 to 542 μg m⁻³) were higher than the value set by the Department of Safety and Health for respirable dust (150 μg m⁻³). Additionally, they were higher than the value of PM₁₀ recorded in indoor environments from other studies. The composition of heavy metals in PM₁₀ and indoor dust were found to be dominated by Zn and results also showed that the concentration of heavy metals in indoor dust and PM₁₀ in this study was higher than levels recorded in other similar studies. The asbestos concentration was 0.0038 ± 0.0011 fibers/cc. This was lower than the value set by the Malaysian Department of Occupational, Safety and Health (DOSH) regulations of 0.1 fibers/cc, but higher than the background value usually recorded in indoor environments. This study strongly suggests that renovation issues need to be considered seriously

  13. Implementation of a Project-Based Engineering School: Increasing Student Motivation and Relevant Learning

    Science.gov (United States)

    Terrón-López, María-José; García-García, María-José; Velasco-Quintana, Paloma-Julia; Ocampo, Jared; Vigil Montaño, María-Reyes; Gaya-López, María-Cruz

    2017-01-01

    The School of Engineering at Universidad Europea de Madrid (UEM) implemented, starting in the 2012-2013 period, a unified academic model based on project-based learning as the methodology used throughout the entire School. This model expects that every year, in each grade, all the students should participate in a capstone project integrating the…

  14. Financing New Technologies, Equipment/Furniture Replacement, and Building Renovation: A Survey Report.

    Science.gov (United States)

    Shirk, Gary M.

    1984-01-01

    Reports results of survey of methods used by 77 North American academic and public libraries to finance implementation of new technologies, replace equipment and furniture, and renovate buildings. Financing methods used, frequency of use, choice, and range of methods are discussed. Eight references and list of survey participants are appended.…

  15. Urban High School Student Engagement through CincySTEM iTEST Projects

    Science.gov (United States)

    Beckett, Gulbahar H.; Hemmings, Annette; Maltbie, Catherine; Wright, Kathy; Sherman, Melissa; Sersion, Brian

    2016-01-01

    This paper focuses on the notable heightening of underrepresented students' engagement in STEM education through project-based learning CincySTEM iTEST projects. The projects, funded by an iTEST NSF grant, were designed and facilitated by teachers at a new STEM urban public high school serving low-income African-American students. Student…

  16. Energy Design Guidelines for High Performance Schools: Hot and Humid Climates

    Energy Technology Data Exchange (ETDEWEB)

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs. These savings can be redirected to educational needs such as additional teachers, instructional materials, or new computers. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school. By incorporating these principles, you can create and exemplary building that is both energy and resource efficient.

  17. Energy Design Guidelines for High Performance Schools: Temperate and Humid Climates

    Energy Technology Data Exchange (ETDEWEB)

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs. These savings can be redirected to educational needs such as additional teachers, instructional materials, or new computers. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school. By incorporating these principles, you can create and exemplary building that is both energy and resource efficient.

  18. Energy Design Guidelines for High Performance Schools: Temperate and Mixed Climates

    Energy Technology Data Exchange (ETDEWEB)

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs. These savings can be redirected to educational needs such as additional teachers, instructional materials, or new computers. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school. By incorporating these principles, you can create and exemplary building that is both energy and resource efficient.

  19. Energy Design Guidelines for High Performance Schools: Cold and Humid Climates

    Energy Technology Data Exchange (ETDEWEB)

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs. These savings can be redirected to educational needs such as additional teachers, instructional materials, or new computers. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school. By incorporating these principles, you can create and exemplary building that is both energy and resource efficient.

  20. Energy Design Guidelines for High Performance Schools: Cool and Dry Climates

    Energy Technology Data Exchange (ETDEWEB)

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs. These savings can be redirected to educational needs such as additional teachers, instructional materials, or new computers. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school. By incorporating these principles, you can create and exemplary building that is both energy and resource efficient.

  1. Energy Design Guidelines for High Performance Schools: Hot and Dry Climates

    Energy Technology Data Exchange (ETDEWEB)

    2002-01-01

    School districts around the country are finding that smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs. These savings can be redirected to educational needs such as additional teachers, instructional materials, or new computers. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school. By incorporating these principles, you can create an exemplary building that is both energy and resource efficient.

  2. Energy Design Guidelines for High Performance Schools: Cool and Humid Climates

    Energy Technology Data Exchange (ETDEWEB)

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs. These savings can be redirected to educational needs such as additional teachers, instructional materials, or new computers. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school. By incorporating these principles, you can create and exemplary building that is both energy and resource efficient.

  3. The droso4schools project: Long-term scientist-teacher collaborations to promote science communication and education in schools.

    Science.gov (United States)

    Patel, Sanjai; DeMaine, Sophie; Heafield, Joshua; Bianchi, Lynne; Prokop, Andreas

    2017-10-01

    Science communication is becoming an increasingly important part of a scientist's remit, and engaging with primary and secondary schools is one frequently chosen strategy. Here we argue that science communication in schools will be more effective if based on good understanding of the realities of school life, which can be achieved through structured participation and/or collaboration with teachers. For example, the Manchester Fly Facility advocates the use of the fruit fly Drosophila as an important research strategy for the discovery processes in the biomedical sciences. To communicate this concept also in schools, we developed the 'droso4schools' project as a refined form of scientist-teacher collaboration that embraces the expertise and interests of teachers. Within this project, we place university students as teaching assistants in university partner schools to collaborate with teachers and develop biology lessons with adjunct support materials. These lessons teach curriculum-relevant biology topics by making use of the profound conceptual understanding existing in Drosophila combined with parallel examples taken from human biology. By performing easy to implement experiments with flies, we bring living organisms into these lessons, thus endeavouring to further enhance the pupil's learning experience. In this way, we do not talk about flies but rather work with flies as powerful teaching tools to convey mainstream curriculum biology content, whilst also bringing across the relevance of Drosophila research. Through making these lessons freely available online, they have the potential to reach out to teachers and scientists worldwide. In this paper, we share our experiences and strategies to provide ideas for scientists engaging with schools, including the application of the droso4schools project as a paradigm for long-term school engagement which can be adapted also to other areas of science. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All

  4. Progress Report of the Schools Television Research Project--III

    Science.gov (United States)

    Kemelfield, Graeme

    1969-01-01

    "This concluding article provides the first published account of a series of psychological experiments which are presently being undertaken by the Schools Television Research Project, examining presentation factors in instructional television. (Editor)

  5. Análisis económico y financiero de las empresas cotizadas pertenecientes al sector de las energías renovables

    OpenAIRE

    Rodríguez Regueiro, Luis Manuel

    2012-01-01

    Situados en este contexto, el objetivo de este Trabajo Fin de Master es ofrecer una visión del sector de las energías renovables, mediante el estudio de sus características y su funcionamiento, y analizar la situación económica y financiera que presentan las empresas cotizadas pertenecientes al sector de las energías renovables.

  6. Application of Markovian model to school enrolment projection ...

    African Journals Online (AJOL)

    Application of Markovian model to school enrolment projection process. VU Ekhosuehi, AA Osagiede. Abstract. No Abstract. Global Journal of Mathematical Sciences Vol. 5(1) 2006: 9-16. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT.

  7. The Roland Maze Project - school-based extensive air shower network

    International Nuclear Information System (INIS)

    Feder, J.; Jedrzejczak, K.; Karczmarczyk, J.; Lewandowski, R.; Swarzynski, J.; Szabelska, B.; Szabelski, J.; Wibig, T.

    2006-01-01

    We plan to construct the large area network of extensive air shower detectors placed on the roofs of high school buildings in the city of Lodz. Detection points will be connected by INTERNET to the central server and their work will be synchronized by GPS. The main scientific goal of the project are studies of ultra high energy cosmic rays. Using existing town infrastructure (INTERNET, power supply, etc.) will significantly reduce the cost of the experiment. Engaging high school students in the research program should significantly increase their knowledge of science and modern technologies, and can be a very efficient way of science popularisation. We performed simulations of the projected network capabilities of registering Extensive Air Showers and reconstructing energies of primary particles. Results of the simulations and the current status of project realisation will be presented

  8. High School Geography Project. Legacy for the Seventies. An Analysis of the High School Geography Project in Relation to New Developments in Geographic Education Worldwide.

    Science.gov (United States)

    Gunn, Angus M., Ed.

    Nine articles by geographers and educators analyze the High School Geography Project (HSGP). A project overview by Angus Gunn presents essential ideas and content of six units and several preliminary reactions. The question of "HSGP exportability" to France and Germany is examined in articles by Maurice Saint-Yves and Robert Geipel…

  9. Evaluation of authentic science projects on climate change in secondary schools : a focus on gender differences

    NARCIS (Netherlands)

    Dijkstra, Elma; Goedhart, Martin

    2011-01-01

    Background and purpose: This study examines secondary-school students' opinions on participating in authentic science projects, which are part of an international EU project on climate change research in seven countries. Partnerships between schools and research institutes result in student projects

  10. The Effect of Soil Education Project on Pre-School Children

    Science.gov (United States)

    Gulay, Hulya; Yilmaz, Sevket; Gullac, Esin Turan; Onder, Alev

    2010-01-01

    The objective of this study is to evaluate the efficiency of the first two group applications of the project named "We are Learning about the Soil with Tipitop and His Friends" within the scope of the project group activities of The Scientific and Technological Research Council of Turkey (TUBITAK) "Schools of Nature and…

  11. A Cautionary Analysis of a Billion Dollar Athletic Expenditure: The History of the Renovation of California Memorial Stadium and the Construction of the Barclay Simpson Student Athlete High Performance Center. Research & Occasional Paper Series: CSHE.3.17

    Science.gov (United States)

    Cummins, John

    2017-01-01

    This paper is a description and analysis of the history of the renovation of Memorial Stadium and the building of the Barclay Simpson Student Athlete High Performance Center (SAHPC) on the Berkeley campus, showing how incremental changes over time result in a much riskier and financially less viable project than originally anticipated. It…

  12. Jordan: Background and U.S. Relations

    Science.gov (United States)

    2014-12-02

    Estonia’s Enefit Eesti Energia AS also has signed agreements on oil shale projects. In 2012, the Canadian company, Global Oil Shale Holdings (GOSH...variety of sectors including democracy assistance, water preservation, and education (particularly building and renovating public schools). In the

  13. Energy and comfort performance evaluation after renovation of an office building

    Energy Technology Data Exchange (ETDEWEB)

    Renzi, V.; Burgun, F. [Inst. National de l' Energie Solaire, Le Bourget du Lac (France)

    2009-07-01

    Buildings constitute 42.5 per cent of the energy consumption in Europe. As such, the building sector represents a high potential for innovation in terms of reducing global energy consumption. Since existing buildings represent a large part of the built environment, refurbishment is an important issue to consider. However, efficient processes of renovation must be well defined. France's National Institute of Solar Energy has developed a methodology to reduce consumption of primary energy use and decrease greenhouse gas emissions in the built environment, while increasing user comfort. The methodology places much emphasis on the health and comfort of occupants from the very beginning of the process. The methodology was developed to make the building renovation process more efficient by elaborating generic guidelines and tools. In this study, an office building from the 1970s was refurbished and monitored for both energy performance and comfort. The objective was to better understand the technological and psychosocial aspects involved in refurbishing an old building. Measurements were compared with the perception of the occupants. The impacts of human interaction on the building behaviour was also evaluated. 6 refs., 1 tab., 4 figs.

  14. Evaluation of Water Quality Renovation by Advanced Soil-Based Wastewater Treatment Systems

    Science.gov (United States)

    Cooper, J.; Loomis, G.; Kalen, D.; Boving, T.; Morales, I.; DeLuca, J.; Amador, J.

    2013-12-01

    25% of US households utilize onsite wastewater treatment systems (OWTS) for wastewater management. Advanced technologies were designed to overcome the inadequate wastewater treatment by conventional OWTS in critical shallow water table areas, such as coastal zones, in order to protect ground water quality. In addition to the septic tank and soil drainfield that comprise a conventional OWTS, advanced systems claim improved water renovation with the addition of sand filtration, timed dosing controls, and shallow placement of the infiltrative zone. We determined water quality renovation functions under current water table and temperature conditions, in anticipation of an experiment to measure OWTS response to a climate change scenario of 30-cm increase in water table elevation and 4C temperature increase. Replicate (n=3) intact soil mesocosms were used to evaluate the effectiveness of drainfields with a conventional wastewater delivery (pipe-and-stone) compared to two types of pressurized, shallow narrow drainfield. Results under steady state conditions indicate complete removal of fecal coliform bacteria, phosphorus and BOD by all soil-based systems. By contrast, removal of total nitrogen inputs was 16% in conventional and 11% for both advanced drainfields. Effluent waters maintained a steady state pH between 3.2 - 3.7 for all technologies. Average DO readings were 2.9mg/L for conventional drainfield effluent and 4.6mg/L for advanced, showing the expected oxygen uptake with shallow placement of the infiltrative zone. The conventional OWTS is outperforming the advanced with respect to nitrogen removal, but renovating wastewater equivalently for all other contaminants of concern. The results of this study are expected to facilitate development of future OWTS regulation and planning guidelines, particularly in coastal zones and in the face of a changing climate.

  15. Renovating Alzheimer's: "Constructive" Reflections on the New Clinical and Research Diagnostic Guidelines

    Science.gov (United States)

    George, Daniel R.; Qualls, Sara H.; Camp, Cameron J.; Whitehouse, Peter J.

    2013-01-01

    The development of disease concepts for conditions such as Alzheimer's disease (AD) is an ongoing social process that evolves over time. The biomedical paradigm about AD that has informed our culture's understanding of brain aging for the past several decades is currently undergoing a major and timely renovation in the early 21st century. This…

  16. Means for the regulation of renewable energies; Instrumentos de regulacion para renovables

    Energy Technology Data Exchange (ETDEWEB)

    Peraza, Alejandro [Comision Reguladora de Energia, Mexico (Mexico)

    2007-06-15

    It is basically described in this presentation, those means used by the Comision Reguladora de Energia (CRE) in order to control the distribution of the available renewable energies, as well as to show the modifications done to its contracts. Besides, there are described the most relevant information about the CRE's law. There are mentioned some of the changes done to some clauses of different contracts, among the contracts found here there can be: contract for the interconnection of renewable energies, contract for the interconnection for a small source of solar energy. [Spanish] En esta presentacion se describen primordialmente los instrumentos que la Comision Reguladora de Energia (CRE) utiliza con el fin de reglamentar la distribucion de las diversas energias renovables disponibles, asi como mostrar las modificaciones que se han realizado en sus contratos. Ademas, se describen los principales aspectos de la Ley de la CRE. Asimismo, se mencionan algunas de las modificaciones que se les ha hecho a diversos contratos: Contrato de interconexion de renovables, contrato de interconexion para fuente de energia solar en pequena escala.

  17. AVE project

    International Nuclear Information System (INIS)

    2004-01-01

    During 1998, ANAV began to optimize Human Resources to cope with the ERE and ANA-ANV integration. Project AVE was intended to achieve an orderly transfer of know-how, skills, attitudes and experiences. The most complex part was renovation of personnel with Operating Licenses. Nearly 140 people had joined the organization by late December 2003. This opportunity was seized to draw up a new Training Manual, and a common Initial Training Plan was designed for the two plants, accounting for the singularities of each one. The plan is divided into 5 modules: Common Training, Specific Training, PEI/CAT, Management, and on-the-job Training. The training environments were defined according to the nature of the capabilities to be acquired. Project AVE resulted in the merger of the Asco and Vandellos II Training services. (Author)

  18. CONVERGENCE AS A RENOVATION/CONSERVATION TOOL FOR JOURNALISM IN GALICIA: STRATEGIES AND UNCERTAINTIES

    Directory of Open Access Journals (Sweden)

    Carlos Toural Bran

    2012-06-01

    Full Text Available This paper offers a theoretical reflection on the concept of convergence in the Autonomous Community of Galicia, in Spain. In this geographic area, marked by its respect for journalistic tradition (especially referring to the press and its inertia, it is possible to distinguish two different attitudes (actually conflicting with regard to the convergence phenomenon. Conservation strategies coexist, therefore, (focusing mainly on the business aspect of the convergent phenomenon with renovation strategies (creation of new spaces on the web, great commitment to the possibilities offered by new technologies and social networks. We are presenting an analytical study of the coexistence of these two interpretations of convergence (marketing and technological, respectively in the communication ecosystem of Galicia. We can recognize the beginning of a dialectic tension between the discourses of renovation and conservation which at present coexist in harmony. It is assumed that the information industry in Galicia will eventually choose the path that guarantees the survival of its media.

  19. Convergence as a renovation/conservation tool for journalism in Galicia: strategies and uncertainties

    Directory of Open Access Journals (Sweden)

    Xosé López García

    2012-06-01

    Full Text Available This paper offers a theoretical reflection on the concept of convergence in the Autonomous Community of Galicia, in Spain. In this geographic area, marked by its respect for journalistic tradition (especially referring to the press and its inertia, it is possible to distinguish two different attitudes (actually conflicting with regard to the convergence phenomenon. Conservation strategies coexist, therefore, (focusing mainly on the business aspect of the convergent phenomenon with renovation strategies (creation of new spaces on the web, great commitment to the possibilities offered by new technologies and social networks. We are presenting an analytical study of the coexistence of these two interpretations of convergence (marketing and technological, respectively in the communication ecosystem of Galicia. We can recognize the beginning of a dialectic tension between the discourses of renovation and conservation which at present coexist in harmony. It is assumed that the information industry in Galicia will eventually choose the path that guarantees the survival of its media.

  20. Energy Design Guidelines for High Performance Schools: Hot and Dry Climates (Revision)

    Energy Technology Data Exchange (ETDEWEB)

    2002-06-01

    School districts around the country are finding that the smart energy choices can help them save money and provide healthier, more effective learning environments. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs. These savings can be redirected to educational needs such as additional teachers, instructional materials, or new computers. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school. By incorporating these principles, you can create and exemplary building that is both energy and resource efficient.

  1. Primary school teacher’s mentor’s competencies

    OpenAIRE

    Masiulienė, Jūratė

    2006-01-01

    Teachers need to re-create their role to suit new situations and relationship in Lithuania; teacher educators – create approaches and methods allowing teachers make a transition. Teacher competencies in this context come into the centre of reform. After renovation of the primary education concept, primary education program, primary school teacher’s education standards, certification provisions according to European Community agreements on the free professional movement, qualification reco...

  2. Prerequisites for Successful Strategic Partnerships for Sustainable Building Renovation

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Johansen, Jakob Berg; Thuesen, Christian

    2017-01-01

    and analysis of strategic partnerships models as well as typical processes used in building renovation. Experiences from development of new strategic partnerships have particularly been found in the UK and Sweden. Based on two workshops with practitioners representing the whole value chain in the construction...... particularly in terms of reducing energy consumption and use of resources and increase productivity. However, until now we have only had a limited number of such partnerships implemented and the few examples that do exist, mostly concern the construction of new buildings. The paper is based on an investigation...

  3. " La chatarra ferrosa, ¿desperdicio industrial o recurso renovable?"

    OpenAIRE

    Valadez Valenzuela, Jaime arturo

    2011-01-01

    Conforme el avance del tiempo, y el deterioro o consumismo de los recursos renovables por el paso desenfrenado de nuestra humanidad, enfrentando el reto de subsistencia en todos los ámbitos, se nos esta presentando la necesidad de aprovechar todo aquello que de una u otra forma pueda ser reutilizado, generando inclusive la forma de otorgar "trabajo", o una manera de crear fuentes económicas para toda una gama de personas, que de tal manera que dedicándose tanto a la recolección de lo que par...

  4. Extreme Energy Events Project: Construction of the detectors and installation in Italian High Schools

    International Nuclear Information System (INIS)

    Abbrescia, M.; An, S.; Antolini, R.; Badala, A.; Baldini Ferroli, R.; Bencivenni, G.; Blanco, F.; Bressan, E.; Chiavassa, A.; Chiri, C.; Cifarelli, L.; Cindolo, F.; Coccia, E.; De Pasquale, S.; Di Giovanni, A.; D'Incecco, M.; Fabbri, F.L.; Frolov, V.; Garbini, M.; Gustavino, C.

    2008-01-01

    The EEE Project, conceived by its leader Antonino Zichichi, aims to detect Extreme Energy Events of cosmic rays with an array of muon telescopes distributed over the Italian territory. The Project involves Italian High Schools in order to introduce young people to Physics, also countervailing the recent crisis of university scientific classes inscriptions. The detectors for the EEE telescopes are Multigap Resistive Plate Chambers (MRPC) and have been constructed by teams of High School students who went in shift at the CERN laboratories. The mechanics and the electronics were developed by groups of researchers from CERN, the Italian Centro Fermi and INFN. The first group of schools of the EEE Project has inaugurated their telescopes recently. A status report of the Project and the preliminary results are presented

  5. Extreme Energy Events Project: Construction of the detectors and installation in Italian High Schools

    CERN Document Server

    Abbrescia, M; An, S; Antolini, R; Badalà, A; Baldini Ferroli, R; Bencivenni, G; Blanco, F; Bressan, E; Chiavassa, A; Chiri, C; Cifarelli, L; Cindolo, F; Coccia, E; De Pasquale, S; Di Giovanni, A; D’Incecco, M; Fabbri, F L; Frolov, V; Garbini, M; Gustavino, C; Hatzifotiadou, D; Imponente, G; Kim, J; La Rocca, P; Librizzi, F; Maggiora, A; Menghetti, H; Miozzi, S; Moro, R; Panareo, M; Pappalardo, G S; Piragino, G; Riggi, F; Romano, F; Sartorelli, G; Sbarra, C; Selvi, M; Serci, S; Williams, C; Zuyeuski, R

    2008-01-01

    The EEE Project, conceived by its leader Antonino Zichichi, aims to detect Extreme Energy Events of cosmic rays with an array of muon telescopes distributed over the Italian territory. The Project involves Italian High Schools in order to introduce young people to Physics, also countervailing the recent crisis of university scientific classes inscriptions. The detectors for the EEE telescopes are Multigap Resistive Plate Chambers (MRPC) and have been constructed by teams of High School students who went in shift at the CERN laboratories. The mechanics and the electronics were developed by groups of researchers from CERN, the Italian Centro Fermi and INFN. The first group of schools of the EEE Project has inaugurated their telescopes recently. A status report of the Project and the preliminary results are presented.

  6. Super-energy wrap-up model for renovation of standard wooden houses in Greenland?

    DEFF Research Database (Denmark)

    Bjarløv, Søren Peter; Vladyková, Petra

    2012-01-01

    This paper is based on the developed theoretical practice of super-insulation solution for renovation of exiting standard wooden houses in Greenland built from 1950s until 2006, more than half the building stock in Arctic Greenland. From various perspectives, the wrap-up system is evaluated as a ...

  7. Status report on the GANIL renovation program

    International Nuclear Information System (INIS)

    Loyer, F.

    1995-01-01

    Three years ago, a renovation program was initiated to ensure GANIL a lifetime of at least 15 years in order to allow an efficient use of the two radioactive ion beam facilities, SISSI which has been operational since last year and SPIRAL which will be in use in 98. The status of this program is reported which mainly concerns the control system, the RF systems (voltage and phase control devices), the vacuum system (control and pumping devices), the power supplies (interfaces, current sensors, and internal electronics), the beam instrumentation (electronics and local control devices) and the system which survey the accelerator access. The improvements of the accelerator ECR sources are also described and the first results to produce refractor metallic ion beams like uranium are mentioned. (author)

  8. Anticipating Stimulus Money for Campus Projects, Colleges Get "Shovel Ready"

    Science.gov (United States)

    Carlson, Scott

    2009-01-01

    Help for colleges may be on the way in the $825-billion stimulus package being pressed by Congressional leaders. The bill that House Democrats introduced this month includes $7-billion for higher-education modernization, renovation, and repair that could kick-start projects like upgrading heating and cooling systems, fixing roofs, and doing…

  9. Cafe Society: Do School Libraries Need a Double Shot of Espresso?

    Science.gov (United States)

    Whelan, Debra Lau

    2008-01-01

    When Jim Chadwell, the former principal of Northwest High School in Texas, renovated his media center four years ago, he had two things in mind: Starbucks and Barnes & Noble. According to Media Specialist Naomi Bates, Chadwell wanted a place where students could read, do research, and work on classroom assignments, but also socialize. That is…

  10. Where Sustainable School Meets the ‘Tthird Teacher’: Primary School Case Study From Barcelona, Spain

    Directory of Open Access Journals (Sweden)

    Marta Brkovic

    2015-07-01

    Full Text Available Participatory evaluation of aspiring sustainable schools and their pedagogical potential has recently come into focus. A few authors have made a significant start in examining schools as both environmentally and socially sustainable environments, which might simultaneously represent the ‘third teacher’. However, discussion around this idea is new in Spain. This paper describes a participatory post-occupancy study conducted with teachers and pupils in Fort Pienc School, Barcelona, Spain. Findings reveal the pedagogical potential of the school’s spaces and fabric, characterised as ‘sustainable’, and highlight the aspects that the research participants feel are performing and underperforming. The paper concludes that if we want sustainable schools to be a strategy for renovating the educational process and for leading us towards a better tomorrow globally and locally,  new models for exploring the pedagogical potential of sustainable schools should be developed and the efforts of all relevant parties synchronised; from architects to governments, from pupils to teachers.

  11. 76 FR 47917 - Lead; Clearance and Clearance Testing Requirements for the Renovation, Repair, and Painting Program

    Science.gov (United States)

    2011-08-05

    ... available, e.g., Confidential Business Information (CBI) or other information whose disclosure is restricted... to window replacement to complete kitchen and bath renovations to building additions and everything...

  12. Evaluation of Authentic Science Projects on Climate Change in Secondary Schools: A Focus on Gender Differences

    Science.gov (United States)

    Dijkstra, Elma; Goedhart, Martin

    2011-01-01

    Background and purpose: This study examines secondary-school students' opinions on participating in authentic science projects which are part of an international EU project on climate change research in seven countries. Partnerships between schools and research institutes result in student projects, in which students work with and learn from…

  13. The Pedagogic Project as Provocative of the Collective Work in the School

    Directory of Open Access Journals (Sweden)

    Elaine Sampaio Araujo

    2007-06-01

    Full Text Available The objective of this article is to discuss, starting from the historical-cultural perspective, the sense of a pedagogic project considering its procedural nature, the convergence of the personal and collective dimensions and the educational purpose. The goal is to notice the project as possibility in the field pragmatic and in the theory of the sciences of human formation, linking the human development with the schools and its projects. For that, it tries to demonstrate that pedagogic projects configured as activity don't just legitimate the collective participation as it establish a new theoretical and/or methodological order in the organization of the pedagogic work, provoking a school that learns and grows in the search of forming men and women of the best human quality.

  14. THE PROJECT-BASED CURRICULUM AND COMPLEXITY IN SCHOOL: POSSIBILITIES FOR AN EDUCATION ON VALUES

    Directory of Open Access Journals (Sweden)

    Ricardo Fernandes Pátaro

    2013-07-01

    Full Text Available This paper is derived from a dissertation and the main goal is to argue how the project-based curriculum, in a perspective of complexity, can offers some possibilities for an education on values introducing studies of nowadays social problems into the school. To achieve the objectives was considered a project developed with a ten years old students. The investigation was based on project activities and daily field. As a result we have demonstrated the project-based curriculum – using the complexity, interdisciplinary and transversality as references – can help school to combine the disciplinary knowledge to the ethical formation. The investigation has show that the project-based curriculum may lead schools to succeed in implementing an education in values, pointing out some directions to develop citizens who can deal with diversity and conflicts as well as capable of get indignant with the injustices and have disposal to individual and collective welfare.

  15. A Project-Centric Course on Cyberinfrastructure to Support High School STEM Education

    Directory of Open Access Journals (Sweden)

    Daphne Rainey

    2013-06-01

    Full Text Available Recent rapid advances in information technology pose new challenges for teachers in the Science, Technology, Engineering, and Mathematics (STEM fields to incorporate the latest knowledge and technical expertise into courses in a way that will be applicable to students as future scientists. A demonstration project was designed, developed, and deployed by university faculty and high school teachers for their students to explore the use of the components of cyberinfrastructure. The project explored the introduction of cyberinfrastructure through the use of bioinformatics and the use of team science. This paper describes the high school course that was deployed at Galileo Magnet High School (GMHS in collaboration with the scientists at Virginia Tech University, and details its overall assessment. Implementation of a project-centric teaching paradigm to engage students in applying the concepts of cyberinfrastructure by integrating the disciplines of biology, computer science, mathematics, and statistics through bioinformatics was an integral part of this study.

  16. Tips for cleanroom construction and renovation.

    Science.gov (United States)

    Mixon, William; Huffman, Lanny

    2009-01-01

    The installation or renovation of a cleanroom is an increasing priority among compounders who, to offer sterile preparations, must comply with the most recent version of United States Pharmacopeia revised General Chapter 797 guidelines. To upgrade their pharmacy facilites, many compounders have worked successfully with a large-scale mechanical engineering firm or a specialized construction company dedicated to cleanroom installation. However, a qualified local mechanical contractor with design capability is a valuable and often overlooked resource for the construction of customized stae-of-the-art cleanrooms. In this report, we describe the installation of such a facility in a busy pharmacy and suggest ways in which compounding pharmacists can identify competent local contractors and control the cost of construction and upgrades. The addition of a cleanroom has enabled The Compounding Pharmacy in Hickory, North Carolina, to achieve accreditation from the Pharmacy Compounding Accreditation Board.

  17. Seward Park High School Project CABES 1984-1985. OEA Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    Career Advancement through Bilingual Educational Skills (Project CABES) completed the second year of a 3-year funding cycle at Seward Park High School on Manhattan's Lower East Side. Project CABES serves 233 recently immigrated, predominantly low-income, ninth through twelfth grade, Hispanic students of limited English proficiency (LEP). Included…

  18. Readings in Wildlife and Fish Conservation, High School Conservation Curriculum Project.

    Science.gov (United States)

    Ensminger, Jack

    This publication is a tentative edition of readings on Wildlife and Fish Conservation in Louisiana, and as such it forms part of one of the four units of study designed for an experimental high school course, the "High School Conservation Curriculum Project." The other three units are concerned with Forest Conervation, Soil and Water…

  19. Renovating process for Pressurized Water Reactor control rod assemblies and corresponding control

    International Nuclear Information System (INIS)

    Jahnke, S.; Ple, P.

    1989-01-01

    In the first PWRs the control rods are moving by the intermediary of electromagnetic mechanisms where the power fed to the electromagnets is selected by a hard wired logic circuit connected to the controldesh by another logic control. For renovating the control rod assemblies each power assembly is replaced by an electronic assembly containing an ordinator and power supply interfaces [fr

  20. [History of the renovation of the hôtel-Dieu of Bourges].

    Science.gov (United States)

    Gitton, Philippe

    2006-01-01

    From the 16th to the 20th century "hôtel-Dieu" was the main hospital in the Berry capital. In the 30's the mayor decided to renovate the building but in 1994 the construction of a new hospital--"Centre Hospitalier Jacques-Coeur"--freed the ancient building which became a historical centre for culture et tourism in the region.

  1. Development and Validation of a Project Package for Junior Secondary School Basic Science

    Science.gov (United States)

    Udofia, Nsikak-Abasi

    2014-01-01

    This was a Research and Developmental study designed to develop and validate projects for Junior Secondary School Basic Science instruction and evaluation. The projects were developed using the project blueprint and sent for validation by experts in science education and measurement and evaluation; using a project validation scale. They were to…

  2. A framework for sustainability science: a renovated IPAT identity.

    Science.gov (United States)

    Waggoner, P E; Ausubel, J H

    2002-06-11

    Learning actors' leverage for change along the journey to sustainability requires quantifying the component forces of environmental impact and integrating them. Population, income, consumers' behavior, and producers' efficiency jointly force impact. Here, we renovate the "IPAT Identity" to identify actors with the forces. Forcing impact I are P for population, A for income as gross domestic product (GDP) per capita, C for intensity of use as a good per GDP, and T for efficiency ratios as impact per good. In the "ImPACT Identity," parents modify P, workers modify A, consumers modify C, and producers modify T. Because annual percentage changes in component forces add to a change in national impact, actors' leverage is reflected transparently in consistent units of annual percentage changes that can be compared from force to force. Examples from energy and food, farming and manufacturing, and steel and water show that declining C, called dematerialization, can temper the sustainability challenge of growth (P x A), and that innovation or efficient technology that lowers T can counter rising consumption (P x A x C). Income elasticity can accommodate connections between income and other forces. From rates of change of forces, the identity can forecast impacts. Alternatively, by identifying the necessary change in forces to cause a projected impact, ImPACT can assay the likelihood and practicability of environmental targets and timetables. An annual 2-3% progress in consumption and technology over many decades and sectors provides a benchmark for sustainability.

  3. A sustainable school for the citizens of tomorrow; Une ecole durable pour les citoyens de demain

    Energy Technology Data Exchange (ETDEWEB)

    Hondekyn, L A; Heise, N; Wurzner, E; Djigaouri, D; Faure, L; Weksej, E; Irigoin, M; Le Vannier, I; Petersen, M; Reff, R

    2000-04-01

    All municipalities in Europe have schools to manage, renovate and build. In all of these schools, hundreds of thousands of children are being taught, among other things, to be good citizens. Many boroughs and local councils have been looking to improve energy consumption in schools, with savings of up to 40% or more. A whole variety of initiatives have taken place to raise children's awareness of energy saving, renewable energy and environmental protection for sustainable urban development. This publication presents many realizations in European schools. (A.L.B.)

  4. A sustainable school for the citizens of tomorrow; Une ecole durable pour les citoyens de demain

    Energy Technology Data Exchange (ETDEWEB)

    Hondekyn, L.A.; Heise, N.; Wurzner, E.; Djigaouri, D.; Faure, L.; Weksej, E.; Irigoin, M.; Le Vannier, I.; Petersen, M.; Reff, R.

    2000-04-01

    All municipalities in Europe have schools to manage, renovate and build. In all of these schools, hundreds of thousands of children are being taught, among other things, to be good citizens. Many boroughs and local councils have been looking to improve energy consumption in schools, with savings of up to 40% or more. A whole variety of initiatives have taken place to raise children's awareness of energy saving, renewable energy and environmental protection for sustainable urban development. This publication presents many realizations in European schools. (A.L.B.)

  5. School Autonomy: perspectives and practices in the development of political projects

    Directory of Open Access Journals (Sweden)

    Nora Gluz

    2008-03-01

    Full Text Available State programs promoting school autonomy have been developed within the neo-liberal project and its state reform policies characterized by decentralization and privatization of social services. These programs were fostered as strategies to improve educational quality and equity, in the midst of the redefinition of the role of the state as guarantor of education as a social right. Disputing the neo-liberal view which led to the dismantlement of the welfare state, social movements arising from marginal sectors of society have implemented their own education projects, often working in collaboration with academia. In these projects, school autonomy is seen as a strategy to challenge existing social relations. In this paper, we compare and contrast the meanings attached to the notion of “school autonomy” and the characteristics of the social practices fostered by the educational programs promoted by two different agents, i.e. the state and social movements. Thus, we analyze in the case of Argentina a nation-wide program implemented by the National Ministry of Education (Programa Nueva Escuela Argentina para el Siglo XXI as well as an educational program developed by a social movement (the Movimiento Nacional de Empresas Recuperadas.

  6. Lessons from two Dutch projects for the introduction of computers in schools

    NARCIS (Netherlands)

    ten Brummelhuis, A.C.A.; Plomp, T.

    1993-01-01

    The systematic introduction of computers in schools for general secondary education in The Netherlands started in the early 1980s. Initially, the Dutch government experimented in 1983 with a project in 100 lower general secondary schools limited in scope to gain experience with educational computer

  7. Supporting Social and Cognitive Growth Among Disadvantaged Middle-Grades Students in TASC After-School Projects

    Directory of Open Access Journals (Sweden)

    Christina A. Russell

    2006-09-01

    Full Text Available The field of after-school programming remains rife with unanswered questions. What constitutes quality in after-school programs? Are after-school opportunities valuable for participants regardless of their quality? Are differences in quality associated with differences in participant benefit? This sub-study of the longitudinal evaluation of The After-School Corporation (TASC looks at how after-school opportunities with varying features affect urban middle-grades (6-8 adolescents who live in impoverished circumstances. Supported by the William T. Grant Foundation, the study explores the associations between after-school project features and the social and cognitive outcomes of disadvantaged middle-grades participants in TASC programs. The study relies on data collected during the 2001-02 and 2002-03 school years in eight TASC projects serving middle-grades students.

  8. Music, Synergies and Interculturality: "MUSSI at School" Project

    Science.gov (United States)

    Corte-Real, Maria De Sao Jose

    2008-01-01

    MUSSI is the name of a she-cat from an imaginary story invented and told by children from two elementary schools through different performing modalities. It is also the name of a pilot project of Applied Ethnomusicology funded by a major Portuguese Company, SONAE Sierra, through the local Loures Shopping Centre, which paid for the musical…

  9. Buildings move. The benefit of sustainable renovation of office buildings; Gebouwen bewegen. De winst van duurzame kantoorrenovatie

    Energy Technology Data Exchange (ETDEWEB)

    Van Miert, M. [Bureau Van Miert, Breda (Netherlands); De Ruiter, P. [Architectenbureau Paul de Ruiter, Amsterdam (Netherlands); Verburgt, P.

    2012-05-15

    Within the programme 'EnergieSprong' the development of the so-called Transition Formula was initiated that shows how existing offices can be renovated into energy efficient or even energy neutral buildings. A multidisciplinary view on the existing office buildings stock and users' demand has led to four renovation strategies which are described in this book [Dutch] EnergieSprong heeft het initiatief genomen dit boek te ontwikkelen waarin de Transitieformule laat zien hoe het vandaag de dag mogelijk is om bestaande kantoren heel energiezuinig of zelfs energieneutraal te renoveren. Een multidisciplinaire kijk op de bestaande kantorenvoorraad en de huidige vraag van gebruikers heeft geleid tot een viertal renovatiestrategieen die in dit boek beschreven worden.

  10. Buddy-Tutor Project. Hilo Intermediate School. Final Report, March-July, 1974.

    Science.gov (United States)

    Hawaii Univ., Honolulu. Social Welfare Development and Research Center.

    An operational description of the 1973-74 Buddy-Tutor Project at Hilo Intermediate School in Hilo, Hawaii and an evaluative assessment of its outcome with statistical treatment of the data is provided in this report. This project is an exploratory behavioral intervention program for educationally deprived students and focuses its efforts on the…

  11. Interactive Configuration of High Performance Renovation of Apartment Buildings by the use of CSP

    DEFF Research Database (Denmark)

    Vareilles, E.; Thuesen, Christian; Falcon, M.

    2013-01-01

    of mid-rise (up to seven stories) apartment buildings. The renovation is based on external rectangular panels, always comprising insulation and cladding, and sometimes including, in addition, doors, windows or solar modules. The panels can be fixed directly onto the walls or onto a metal structure around...

  12. Defining Sustainability in Relation to the Renovation of Modern Housing

    DEFF Research Database (Denmark)

    Peters, Terri

    Summary This paper focuses on comparing practice-based and academic definitions and metrics of “sustainability” as they relate to the transformation of Modern housing in Denmark. Keywords:Sustainability, Renovation, Architecture, Denmark, Modern housing 1. Introduction to the Study Buildings...... define and understand what constitutes green design, but also to understand its premises for it would be counter productive for the designer to leap into green design without understanding and agreeing to such basic principles as connectedness”. In recent years, a new way of thinking about sustaina...

  13. The SISIFO project: Seismic Safety at High Schools

    Science.gov (United States)

    Peruzza, Laura; Barnaba, Carla; Bragato, Pier Luigi; Dusi, Alberto; Grimaz, Stefano; Malisan, Petra; Saraò, Angela; Mucciarelli, Marco

    2014-05-01

    For many years, the Italian scientific community has faced the problem of the reduction of earthquake risk using innovative educational techniques. Recent earthquakes in Italy and around the world have clearly demonstrated that seismic codes alone are not able to guarantee an effective mitigation of risk. After the tragic events of San Giuliano di Puglia (2002), where an earthquake killed 26 school children, special attention was paid in Italy to the seismic safety of schools, but mainly with respect to structural aspects. Little attention has been devoted to the possible and even significant damage to non-structural elements (collapse of ceilings, tipping of cabinets and shelving, obstruction of escape routes, etc..). Students and teachers trained on these aspects may lead to a very effective preventive vigilance. Since 2002, the project EDURISK (www.edurisk.it) proposed educational tools and training programs for schools, at primary and middle levels. More recently, a nationwide campaign aimed to adults (www.iononrischio.it) was launched with the extensive support of civil protection volounteers. There was a gap for high schools, and Project SISIFO was designed to fill this void and in particular for those schools with technical/scientific curricula. SISIFO (https://sites.google.com/site/ogssisifo/) is a multidisciplinary initiative, aimed at the diffusion of scientific culture for achieving seismic safety in schools, replicable and can be structured in training the next several years. The students, helped by their teachers and by experts from scientific institutions, followed a course on specialized training on earthquake safety. The trial began in North-East Italy, with a combination of hands-on activities for the measurement of earthquakes with low-cost instruments and lectures with experts in various disciplines, accompanied by specifically designed teaching materials, both on paper and digital format. We intend to raise teachers and students knowledge of the

  14. Vermont EPSCoR Streams Project: Engaging High School and Undergraduate Students in Watershed Research

    Science.gov (United States)

    Ray, E.; McCabe, D.; Sheldon, S.; Jankowski, K.; Haselton, L.; Luck, M.; van Houten, J.

    2009-12-01

    The Vermont EPSCoR Streams Project engages a diverse group of undergraduates, high school students, and their teachers in hands-on water quality research and exposes them to the process of science. The project aims to (1) recruit students to science careers and (2) create a water quality database comprised of high-quality data collected by undergraduates and high school groups. The project is the training and outreach mechanism of the Complex Systems Modeling for Environmental Problem Solving research program, an NSF-funded program at the University of Vermont (UVM) that provides computational strategies and fresh approaches for understanding how natural and built environments interact. The Streams Project trains participants to collect and analyze data from streams throughout Vermont and at limited sites in Connecticut, New York, and Puerto Rico. Participants contribute their data to an online database and use it to complete individual research projects that focus on the effect of land use and precipitation patterns on selected measures of stream water quality. All undergraduates and some high school groups are paired with a mentor, who is either a graduate student or a faculty member at UVM or other college. Each year, undergraduate students and high school groups are trained to (1) collect water and macroinvertebrate samples from streams, (2) analyze water samples for total phosphorus, bacteria, and total suspended solids in an analytical laboratory, and/or (3) use geographic information systems (GIS) to assess landscape-level data for their watersheds. After training, high school groups collect samples from stream sites on a twice-monthly basis while undergraduates conduct semi-autonomous field and laboratory research. High school groups monitor sites in two watersheds with contrasting land uses. Undergraduate projects are shaped by the interests of students and their mentors. Contribution to a common database provides students with the option to expand the

  15. Pathway to Graduation: A Pilot Reading Project for Middle School Students during the Summer Months

    Science.gov (United States)

    Hilsmier, Amanda Strong; Wood, Patricia F.; Wirt, Susan; McTamney, Diane; Malone, Mary Beth; Milstead, Becky

    2014-01-01

    The purpose of this article is to outline the implementation of a summer reading project targeted at middle school students with identified reading deficits and behavioral concerns called Pathway to Graduation (PTG). The project was a collaborative process between a school district, local university, and department of mental health. The students…

  16. A World of Learning: Practical Manual. Enhancing the Multiplier Effect of the Associated Schools Project.

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    This manual presents the major lessons learned about how national authorities, individual institutions, and individual educators can work to increase the impact of the Associated Schools Project (ASP) schools and spread it to other parts of the educational system. ASP is a project of the United Nations Educational, Scientific and Cultural…

  17. Understanding of Danish Passive Houses based on Pilot Project the Comfort Houses

    DEFF Research Database (Denmark)

    Brunsgaard, Camilla

    2010-01-01

    The building industry in Denmark and the rest of Europe is facing challenges in fulfilling the EU directive of 2002. New buildings and renovation projects need to improve the energy performance to be able to fulfil the Kyoto agreement from 1998 (Directive 2002). In Denmark it has resulted in new ...

  18. Architects and Librarians under Pressure: Dialoguing about Renovation of a Library in a Constrained Environment

    Directory of Open Access Journals (Sweden)

    André Lohisse

    2008-09-01

    Full Text Available A librarian and an architect conduct the essential dialogue involved in renovating an academic library in Paris, comparing architectural concerns with the exigencies of public use, and juxtaposing technical requirements with the functional organisation of the library.

  19. Acoustic Properties of a Renovated Building

    Directory of Open Access Journals (Sweden)

    Tomas Januševičius

    2011-02-01

    Full Text Available The article explores the effects of partitions, ceilings and facades on noise insulation in the renovated different buildings. The conducted experiments were aimed at analyzing partitions of 120 mm brick mounted gypsum panels while other walls were 520 mm thick and plastered on both sides. Under natural conditions, sound insulation factors of facades were measured and compared according to comfort classes. The obtained results revealed that thick brick walls of 520 mm insulated the sound of 58 decibels (dB (class B. In contrast, 120 mm brick masonry partition reduced sound only to 48 dB which is class E and agrees with the lowest class of sound insulation. We also calculated the sound insulation factor applying three formulas considering the mass law of sound insulation and comparing it with other previous studies. The paper examines and discusses the findings of the performed calculations and measurements.Article in Lithuanian

  20. ITEAMS: An Out-Of-School Time Project to Promote Gain in Fundamental Science Content and Enhance Interest in STEM Careers for Middle School Students

    Directory of Open Access Journals (Sweden)

    Jaimie L. Miller

    2011-08-01

    Full Text Available We report preliminarily on the efficacy of an innovative, STEM education project for middle-school youth participating in outof- school-time programs, targeting girls and students from underrepresented communities. Participating students attend urban schools in Eastern Massachusetts. The two main goals for the technology-based project are to inspire the participants to consider STEM careers and increase the student mastery of fundamental STEM subject matter. The students control robotic telescopes – either from school or home – to acquire and then process images of solar system and deep space objects. Project teachers attend workshops to become adept at using the robotic telescopes, meet weekly with the students, pilot project curricula, collaborate with staff to plan and supervise field trips and star parties, and assist in all project evaluation. There are both academic and non-academic partners; the latter include amateur astronomers and retired engineers. We use an online system to evaluate teacher and student subject matter knowledge and survey students and parents about STEM careers.

  1. Urban Renewal as an Urban Hegemony Project

    Directory of Open Access Journals (Sweden)

    Gönül İÇLİ

    2012-01-01

    Full Text Available There is an organic relationship between capitalism and urban space. Thisrelationship is a dynamic one which reproduces and renovates itself constantlyaccording to the conjuncture of each period and which evolves / changes inparallel with the necessities and rationalities of capital accumulation in historicalprocess. Therefore, neither reproduction of capitalist urban space with the regimeof capital accumulation nor the process of restructuring following a crisis in theregime of capital accumulation with spatial organization of capitalism can becompared independently. Today, in the concrete phase that capitalism hasreached, urban space has become one of the most important parts of direct capitalaccumulation under the hegemony of financial capital. In this context, urbantransformation projects and various strategies ofthe process becomes significantwith the instrumentalization of space by capital rationality. However, this processcarries the internal paradoxes of capitalism into the urban space at the same time,and cities, competing as candidates to be financial centres where the capital hasintensified and centralized, also transforms into spaces of violent socialpolarization. At this point, especially the reformation of squatter settlements has astrategic importance in the process of urban transformation and there are attemptsto attach the urban poor, who are the addressee of the process, under a widerurban hegemony project with the strategy of urban renovation.

  2. Project-Based Learning versus Textbook/Lecture Learning in Middle School Science

    Science.gov (United States)

    Main, Sindy

    2015-01-01

    As schools continue to become more diverse, it is important to look at science teaching methods that will meet the needs of all students. In this study, 172 students in a middle school in Northwestern Illinois were taught using two methods of teaching science. Half of the students were taught using project-based science (PBS) and the other half of…

  3. Health. Nevada Competency-Based Adult High School Diploma Project.

    Science.gov (United States)

    Nevada Univ., Las Vegas. Coll. of Education.

    This document is one of ten curriculum guides developed by the Nevada Competency-Based Adult High School Diploma (CBAHSD) Project. This curriculum guide on health is divided into ten topics. The topics included are Nutrition, Reproduction, Menstruation, Contraception, Alcohol Abuse, Tobacco, Immunization, Disease, Accident Prevention, and…

  4. Stakeholders' Opinions on "Let the Schools Become Life" Project in Scope of Lifelong Learning Activities

    Science.gov (United States)

    Karatas, Süleyman

    2015-01-01

    The objective of this study is to find out the opinions of school administrators, teachers, staff, benefiting students and parents and other stakeholders of "Let the Schools Become Life" project being carried out in order to reveal the effectiveness and efficiency of the project. Data in this qualitative research was gathered by…

  5. Assessment and Evaluation Report on a Pilot Project on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    In 2002, efforts started on formulating a maintenance policy for schools and other social service facilities in Eritrea. Since then, an appropriate policy and related implementation strategies have been further developed. In 2003, a specific pilot project was designed covering a number of schools...... of a school based approach to school maintenance are presented in the report....

  6. Seward Park High School Project CABES, 1985-1986. OEA Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    In 1985-86, the Career Advancement through Bilingual Education Skills (CABES) project was in the final year of a three-year funding cycle at Seward Park High School in Manhattan, New York. The project's major goal was to provide career advancement skills to a population group of 279 students of limited English proficiency (LEP). Included in the…

  7. Small scale hydraulic power. Hydraulics: the wheel spins. Power producers: times are getting better; MWh are negotiating with fishes; Inspection: game of drones; Moulin de Courteron: a true environment-friendly renovation

    International Nuclear Information System (INIS)

    Piro, Patrick; Bongrain, Timothee

    2017-01-01

    This document addresses the evolution of small-scale hydraulic power in France. It contains 5 articles which concern the small-scale hydro-electric power sector which is gaining confidence, thanks to new regulations (notably about financial incentives and 'call for tender' procedures) and new technologies such as smart drones for site inspection. However, the sector is increasingly faced with environmental issues and oppositions. Presentation of the 'Moulin de Courteron' project, an ancient water mill that has been renovated (installation of 3 x 45 kW turbines) in an exemplary way from the environmental and social points of view (the project has been crowd-funded)

  8. Performance Evaluation and Opportunity Assessment for St. Bernard Project

    Energy Technology Data Exchange (ETDEWEB)

    Dickson, B.

    2011-06-01

    This report describes efforts by IBACOS, a Department of Energy Building America research team, in the St. Bernard Project, a nonprofit, community-based organization whose mission is to assist Hurricane Katrina survivors return to their homes in the New Orleans area. The report focuses on energy modeling results of two plans that the St. Bernard Project put forth as 'typical' building types and on quality issues that were observed during the field walk and Best Practice recommendations that could improve the energy efficiency and durability of the renovated homes.

  9. Performance Evaluation and Opportunity Assessment for St. Bernard Project

    Energy Technology Data Exchange (ETDEWEB)

    Dickson, Bruce [IBACOS, Inc., Pittsburgh, PA (United States)

    2011-06-01

    This report describes efforts by IBACOS, a Building America research team, in the St. Bernard Project, a nonprofit, community-based organization whose mission is to assist Hurricane Katrina survivors to return to their homes in the New Orleans area. The report focuses on energy modeling results of two plans that the St. Bernard Project put forth as 'typical' building types and on quality issues that were observed during the field walk and best practice recommendations that could improve the energy efficiency and durability of the renovated homes.

  10. The bill project on energy transition: what will happen to renewable energies

    International Nuclear Information System (INIS)

    Darson, Alice

    2015-01-01

    The author comments and discusses the content of the French bill project on energy transition, and the controversies on this bill project within the French Parliament. She addresses the objectives of the bill project (share of renewable energies, case of overseas territories), the issue of building construction and renovation, the issue of transports (fleet size, electric vehicles, use of renewable energy), the development of renewable energies (notably for overseas territories, issue of mandatory purchase, issue of connection), the simplification and clarification of procedures, and the possibility for citizen, enterprises, territories and State to act together

  11. Implicit Knowledge of General Upper Secondary School in a Bridge-building Project

    DEFF Research Database (Denmark)

    Rasmussen, Annette; Andreasen, Karen Egedal

    2016-01-01

    Bridge-building activities are practiced widely in the education systems of Europe. They are meant to bridge transitions between lower and upper secondary school and form a mandatory part of the youth guidance system in Denmark. By giving pupils the opportunity to experience the different...... educational context of upper secondary school, bridge-building activities are meant to facilitate their decision-making on educational paths, but also to attract more and new groups of pupils. However, the premises of the inherent differences of educational contexts and of pupils’ lacking knowledge of upper...... secondary education can be questioned. In this ethnographic case study of a bridge-building project in a rural area in Denmark, we analyse the implicit knowledge of the general upper secondary school, as it is practiced in a bridge-building project, and how it is experienced by the pupils on the background...

  12. Renovating Charity Hospital or building a new hospital in post-Katrina New Orleans: economic rationale versus political will.

    Science.gov (United States)

    Leleu, Hervé; Moises, James; Valdmanis, Vivian Grace

    2013-02-01

    Since September 2005, Charity Hospital of New Orleans has been closed due to Hurricane Katrina. A debate following the closing arose about whether this public hospital should be renovated or a new medical center affiliated with the Louisiana State University should be built. Using academic literature, government statistics, and popular press reports, we describe the economic implications that support the view that Charity Hospital should have been renovated. We also address why this policy was not pursued by demonstrating the influence politics and individual stakeholders (specifically, Louisiana State University) had on the eventual policy pursued. In this commentary we also note the political identity movement away from public-sector provision of services to private-sector interests.

  13. Energia Renovable para Centros de Salud Rurales (Renewable Energy for Rural Health Clinics)

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez, T.; Olson, K.

    1999-07-28

    Esta es la primera de una serie de guias de aplicaciones que el Programa de Energia de Villas de NREL esta comisionando para acoplar sistemas comerciales renovables con aplicaciones rurales, incluyendo agua, escuelas rurales y micro empresas. La guia esta complementada por las actividades de desarrollo del Programa de Energia de Villas de NREL, proyectos pilotos internacionales y programas de visitas profesionales.

  14. Problemas institucionales de las energías renovables en México

    OpenAIRE

    Samuel Brugger; Ma. Elena Nancy Dávila Moreno; Manuel Francisco Llamas Galván

    2011-01-01

    Este ensayo trata de explicar los problemas institucionales y jurídicos que han limitado el aprovechamiento de dichas energías alternativas. El trabajo presenta la situación actual de México; después analiza el potencial que tiene el país. De ahí se pasa al estudio de la problemática institucional y jurídica que no ha logrado fomentar la promoción de energías renovables en México.

  15. Problemas institucionales de las energías renovables en México

    Directory of Open Access Journals (Sweden)

    Samuel Brugger

    2011-09-01

    Full Text Available Este ensayo trata de explicar los problemas institucionales y jurídicos que han limitado el aprovechamiento de dichas energías alternativas. El trabajo presenta la situación actual de México; después analiza el potencial que tiene el país. De ahí se pasa al estudio de la problemática institucional y jurídica que no ha logrado fomentar la promoción de energías renovables en México.

  16. Importancia de las energías renovables en la seguridad energética y su relación con el crecimiento económico.

    Directory of Open Access Journals (Sweden)

    Lilian Paola Umbarila Valencia

    2015-12-01

    Full Text Available La creciente demanda de las necesidades sociales a nivel global, impulsada por los hábitos de vida y la forma en la que se organizan las regiones ha llevado al crecimiento paralelo de la industria y con ello al creciente aumento del consumo de energía. Este artículo de investigación reflexiona acerca de la relevancia que tienen las energías renovables para la seguridad energética, teniendo en cuenta la inestabilidad de los precios del petróleo y su influencia en el mercado de los hidrocarburos como fuente primaria de energía. Se evidencian los avances que han tenido las tecnologías de energías renovables a nivel global, regional y local y el rol que juegan en la independencia energética y en la mitigación del impacto ambiental. Se concluye que las naciones deben buscar la optimización de las energías renovables desde los ámbitos: local, regional y global propendiendo por su uso adecuado desde la legislación. El futuro de las energías renovables está dado por la rentabilidad, ya que para que el uso de éstas siga creciendo, deben seguir atrayendo capital lo cual significa que los inversores deben ver una rentabilidad competitiva. Otra recomendación importante es la integración de la energía renovable en la red, incluyendo fuentes de generación intermitentes e incluso imprevisibles. 

  17. PROJECTS EDUCATION RESEARCH: PRACTICAL EXPERIENCED IN A SCHOOL IN / FIELD

    Directory of Open Access Journals (Sweden)

    Rosenilde Nogueira Paniago

    2014-12-01

    Full Text Available This study discusses an investigation done with teachers of a public school, located on countryside, city of Água Boa, Mato Grosso, with a view to looking for new alternatives to the teaching practice on school, by means of using the collaborative realization of projects and researches as pedagogical alternatives. As qualitative approach, the investigation has developed by means of the study of benchmarks, that discuss the research on teaching formation, on teaching practice, education on/of the countryside and, of the projects’ realization of teaching and research with and by teachers. The work enabled to get closer relationship between school and community, to articulate the theoretical knowledge, studied on school, and the life of countryside students, showing the necessity of theoretico-methodological formation with collective engagement of teachers and public politics that propitiate the emergence of conditions to the new practices of teaching on school on/of the countryside by the bias of search.

  18. The Phenomenon of Trust in Flat Owners’ Collective Renovation Strategies in Estonia

    Directory of Open Access Journals (Sweden)

    Liis Ojamäe

    2015-12-01

    Full Text Available Mobilising fl at owners into renovating residential blocks in post-socialist countries has been a complicated process. Evidence from Estonia shows that the success of collective renewal strategies depends not only on economic issues but also on ways investments are organised and, signifi cantly, the relationship of trust between diff erent actors. The paper aims at conceptualising the issue of institutional trust upon the experience of urban housing renewal in Estonia. It is contended that trust is crucial for the joint decision-making in a block as well as for facilitating negotiations between fl at owners’ associations, local municipalities and market actors. The paper draws on three qualitative studies conducted in Estonia during the 2000s, which allow asserting that trust towards new strategies of housing renewal can be achieved and maintained by ‘best practices’, which by concentrating expert knowledge also denote direct communication between experts and fl at owners. While it is important to raise the residents’ technical knowledgeability, it is indispensable to develop abilities to manage and communicate the renovation process between diff erent parties. The public sector is conceived to be a central actor in sustaining trust between actors who have no previous positive experience from collective residential strategies

  19. Evaluation of authentic science projects on climate change in secondary schools: a focus on gender differences

    Science.gov (United States)

    Dijkstra, Elma; Goedhart, Martin

    2011-07-01

    Background and purpose This study examines secondary-school students' opinions on participating in authentic science projects which are part of an international EU project on climate change research in seven countries. Partnerships between schools and research institutes result in student projects, in which students work with and learn from scientists about the global carbon cycle. This study focuses in particular on differences between male and female students, as female students normally like traditional school science less than male students. Sample and design Data, drawn from 1370 students from 60 secondary schools across Europe, were collected through questionnaires taken at the end of the projects. The evaluated aspects were: organization; enjoyment; difficulty; and impact of the projects. Results The findings suggest that authentic science education is appreciated very much by both male students and even more by female students. The projects had positive impacts on climate change ideas, in particular for female students. Female students felt that they had learned many new things more often than male students. Conclusions Both male and female students have positive opinions about the authentic science projects. The results further point to positive effects of activities in which students have an active role, like hands-on experiments or presentation of results. The findings are placed in the international context of science education and their implications for policy are discussed.

  20. The Impact an Oratory Project generates to Primary School Students who live in Rural Areas of Cartago

    Directory of Open Access Journals (Sweden)

    María Gabriela Amador-Solano

    2014-03-01

    Full Text Available This article aims at showing the development and relevance of an extension project in seven rural schools located in “circuito 05” in the central area of Cartago. The main goal is to enhance oral commu­nication in elementary school students. The project was designed as a training workshop for the teach­ers in the chosen schools in order to be taught to students by implementing an oratory club. In each student´s dissertation, the researchers observed the enthusiasm that the project caused in the schools. Objectives, contents, activities, assessment and observations were designed in a didactic plan to be used upon needs of institutions.

  1. Adequacy Post-"Rose v. Council for Better Education" in Kentucky Public School Facilities: A Case Study

    Science.gov (United States)

    Wilson, Caroline Ford

    2013-01-01

    The decision in the 1989 landmark Kentucky case, "Rose v. Council for Better Education," initiated many reforms to ensure that children have access to an adequate education, including funding new construction and renovations for school facilities. The purpose of this instrumental, qualitative case study is to describe how the additional…

  2. Life project of adolescents, a product of socio-educational work of school

    Directory of Open Access Journals (Sweden)

    Maibel Rebollar-Ferrer

    2016-10-01

    Full Text Available The improvement of formative work, through a life orientation that is characterized by the correspondence of aspirations or individual goals, potentials and social demands is a challenge to Junior high school in the design and implementation of sócio–educative system of actions, that led by principals and teachers, integrates socializing agents, in order to prepare adolescents in managing a developmental life project to ensure their integration into dynamic and complex society. This research paper nowadays, from the pedagogical, psychological and sociological references, a conceptual basis for understanding adolescents’ life project as an expression of integral formation and the product of social and educational work of school.

  3. Project NANO (nanoscience and nanotechnology outreach): a STEM training program that brings SEM's and stereoscopes into high-school and middle-school classrooms

    Science.gov (United States)

    Cady, Sherry L.; Blok, Mikel; Grosse, Keith; Wells, Jennifer

    2014-09-01

    The program Project NANO (Nanoscience and Nanotechnology Outreach) enables middle and high school students to discover and research submicroscopic phenomena in a new and exciting way with the use of optical and scanning electron microscopes in the familiar surroundings of their middle or high school classrooms. Project NANO provides secondary level professional development workshops, support for classroom instruction and teacher curriculum development, and the means to deliver Project NANO toolkits (SEM, stereoscope, computer, supplies) to classrooms with Project NANO trained teachers. Evaluation surveys document the impact of the program on student's attitudes toward science and technology and on the learning outcomes for secondary level teachers. Project NANO workshops (offered for professional development credit) enable teachers to gain familiarity using and teaching with the SEM. Teachers also learn to integrate new content knowledge and skills into topic-driven, standards-based units of instruction specifically designed to support the development of students' higher order thinking skills that include problem solving and evidence-based thinking. The Project NANO management team includes a former university science faculty, two high school science teachers, and an educational researcher. To date, over 7500 students have experienced the impact of the Project NANO program, which provides an exciting and effective model for engaging students in the discovery of nanoscale phenomena and concepts in a fun and engaging way.

  4. A community-wide school health project for the promotion of smoke-free homes.

    Science.gov (United States)

    Loke, Alice Yuen; Mak, Y W

    2015-11-26

    A community-wide school health project for the promotion of smoke-free homes was launched in June 2010 with the aim of promoting the benefits of smoke-free homes to all school-aged children (aged 6-18), and indirectly to their parents and family members. The 1-year project included health talks on a smoke-free life; the distribution of educational leaflets; slogan and visual art competitions; and a health fair held in June 2011. Two sets of questionnaires were developed to solicit a resolution and action from the participants regarding the establishment of a smoke-free home, and their decision to stay smoke-free. This is a paper to report on the activities of this project, the attempts to reach out to school-aged children, and their indications of agreement with, support for, and commitment to promoting smoke-free homes. The project reached an estimated 12,800 school-aged children in Hong Kong. A large proportion of those received educational leaflets (69.6-88.2 %). Of those who participated in the health fair, 69.7-87.6 % agreed to promote the concept of smoke-free homes to friends and family. More primary than secondary students pledged to not take up smoking (90.8 vs 85.8 %). About 82 % of those who had experimented with smoking pledged to stop. A small proportion of them reported already having established a smoke-free policy at home (14.9 %), placed a 'No Smoking' sign at home (16.4 %), informed visitors of their smoke-free policy at home (12.9 %), and asked visitors to dispose of lit cigarettes before entering their home (15.9 %). This community-wide school health project on the benefits of smoke-free homes reached a large number of students, and indirectly to family members, and home visitors. Public health efforts of this kind should be continued to reach younger generations and the general public.

  5. Assessment of environmental projects in official schools in the locality 18 in Bogota

    International Nuclear Information System (INIS)

    Herrera R, Juan Francisco; Reyes S, Lucia; Amaya, Hector Oswaldo T .Gerena Oscar Arturo

    2006-01-01

    It was investigated the current state of de School Environment Projects in the public educational institutions of de Town 18 Rafael Uribe Uribe in Bogota (Colombia). The participation grade was measured in the design o execution and evaluation of the environmental projects, the registration and systematising of experiences, the generation of reflection spaces and the structuring to the Institutional Educational Project. By means of the test pilot the variables were determined for the sample design and the validation of the mensuration instrument. Three populations study object were determined and for each was designed a for through which the information of the variable was gathered by means of the method of direct interview. The results show that the overwhelming majority of the considered population didn't participated in the design in the execution of the environmental projects. The registration and systematizing of experiences are minimum, as well as the reflection spaces and conceptualization. There is not articulation from the environmental project to the Institutional Educational Project. The little participation, systematizing of experiences and lack of reflection spaces and conceptualization limit the impact of the School Environmental Projects in the formation of favorable attitudes to the environment

  6. Renovation of CPF (Chemical Processing Facility) for Development of Advanced Fast Reactor Fuel Cycle System

    International Nuclear Information System (INIS)

    Shinichi Aose; Takafumi Kitajima; Kouji Ogasawara; Kazunori Nomura; Shigehiko Miyachi; Yoshiaki Ichige; Tadahiro Shinozaki; Shinichi Ohuchi

    2008-01-01

    CPF (Chemical Processing Facility) was constructed at Nuclear Fuel Cycle Engineering Laboratories of JAEA (Japan Atomic Energy Agency) in 1980 as a basic research field where spent fuel pins from fast reactor (FR) and high level liquid waste can be dealt with. The renovation consists of remodeling of the CA-3 cell and the laboratory A, installation of globe boxes, hoods and analytical equipments to the laboratory C and the analytical laboratory. Also maintenance equipments in the CA-5 cell which had been out of order were repaired. The CA-3 cell is the main cell in which important equipments such as a dissolver, a clarifier and extractors are installed for carrying out the hot test using the irradiated FR fuel. Since the CPF had specialized originally in the research function for the Purex process, it was desired to execute the research and development of such new, various reprocessing processes. Formerly, equipments were arranged in wide space and connected with not only each other but also with utility supply system mainly by fixed stainless steel pipes. It caused shortage of operation space in flexibility for basic experimental study. Old equipments in the CA-3 cell including vessels and pipes were removed after successful decontamination, and new equipments were installed conformably to the new design. For the purpose of easy installation and rearranging the experimental equipments, equipments are basically connected by flexible pipes. Since dissolver is able to be easily replaced, various dissolution experiments is conducted. Insoluble residue generated by dissolution of spent fuel is clarified by centrifugal. This small apparatus is effective to space-saving. Mini mixer settlers or centrifugal contactors are put on to the prescribed limited space in front of the backside wall. Fresh reagents such as solvent, scrubbing and stripping solution are continuously fed from the laboratory A to the extractor by the reagent supply system with semi-automatic observation

  7. [Subtainable health promotion via organisational development--a model project for teachers in professional training schools].

    Science.gov (United States)

    Schumacher, L; Nieskens, B; Bräuer, H; Sieland, B

    2005-02-01

    The goal of this project is the development, implementation and evaluation of a concept designed for sustainable health promotion among occupational and trade school teachers. We assume that for sustainable health promotion -- along with a behavioral prevention program -- a change is necessary in the structure, as well as, the working and communication processes within schools. The realization of early teacher participation and self regulated cooperative groups initiates comprehensive and goal-oriented developmental processes in the project schools. The organizational development process was accomplished in the following way: At the beginning we conducted a diagnosis of school-specific and individual health risks and the resources available to the project schools. The results were reported for both the individual and for the teacher group. This was intended to clarify the potential for improvement and, thus, strengthen the teachers' motivation toward processes of change. Following the diagnosis, the teachers chose areas of stress-related strain and then worked in groups to develop and implement behaviour and working condition-oriented intervention strategies for health promotion. The diagnosis results confirm the necessity of school-specific health promotion: the schools demonstrate very different demand and resource profiles. Furthermore, is has become evident that the central success factor for health promotion in schools is the teachers' willingness for change. The individual and group reports of the diagnosis results seem to have made clear how essential individual and organisational changes are.

  8. A Study on the Evaluation of Science Projects of Primary School Students Based on Scientific Criteria

    Science.gov (United States)

    Gungor, Sema Nur; Ozer, Dilek Zeren; Ozkan, Muhlis

    2013-01-01

    This study re-evaluated 454 science projects that were prepared by primary school students between 2007 and 2011 within the scope of Science Projects Event for Primary School Students. Also, submitted to TUBITAK BIDEB Bursa regional science board by MNE regional work groups in accordance with scientific research methods and techniques, including…

  9. Bilingual Academic and Career Education Services for Hispanic High School Students (Project BACES). Final Evaluation Report, 1992-93. OER Report.

    Science.gov (United States)

    Clarke, Candice

    This report presents an evaluation of the Bilingual Academic and Career Education Services for Hispanic High School Students (Project BACES), an Elementary and Secondary Education Act Title VII-funded project in its third year of operation at DeWitt Clinton High School in the Bronx and George Washington High School in Manhattan. The project served…

  10. SALCER´s Project

    Directory of Open Access Journals (Sweden)

    Carlos Pérez

    2009-12-01

    Full Text Available SALCER (in Spanish: Sistema de Asesoramiento y Localización de Centrales de EnergíaRenovables could be translated as Counseling and Location of Renewable Energy Power Station´s System. Its objective is to develop a system capable of finding the most suitable place for the construction of renewable power stations, taking into account such things as: budget, topography, amount of energy needed, among others. The most relevant aims of the project are: study of a certain variety of renewable energy technologies, designing an accurate topology system, restraining decisions to demand forecasts and finally performance of an energy plan for a specific region

  11. You've Been Served: Surviving a Deposition

    Science.gov (United States)

    Wodarz, Nan

    2010-01-01

    School business managers are in the unique position of supervising the areas of the operation that present the greatest opportunities for legal issues to arise. New construction and renovation projects are strewn with legal land mines. The possibility of lawsuits hovers like a black cloud over personnel issues. Opportunities for transportation or…

  12. The Other Side of the Construction Dialogue: Architects Speak.

    Science.gov (United States)

    DiBella, Cecilia M.

    2001-01-01

    Describes role of the architect in school renovation and construction and offers several suggestions for effective use of an architect: Be realistic; keep the lines of communication open; keep the community experts at bay; contain costs in design, construction, and building maintenance; avoid construction chaos; and add quality to your project.…

  13. Model Wind Turbine Design in a Project-Based Middle School Engineering Curriculum Built on State Frameworks

    Science.gov (United States)

    Cogger, Steven D.; Miley, Daniel H.

    2012-01-01

    This paper proposes that project-based active learning is a key part of engineering education at the middle school level. One project from a comprehensive middle school engineering curriculum developed by the authors is described to show how active learning and state frameworks can coexist. The theoretical basis for learning and assessment in a…

  14. Undergraduate nursing students' perceptions of service-learning through a school-based community project.

    Science.gov (United States)

    Bassi, Sherry

    2011-01-01

    Service-learning (SL) is an experiential teaching method that combines instruction with community service, with the aim of enriching students' academic learning, interpersonal skills and sense of responsibility while making meaningful contributions to the community. However, measuring outcomes of service-learning projects is difficult. This article reports on the perceptions of 18 third-year undergraduate nursing students who took part in a pilot service-learning project targeting tobacco use in a local elementary school. Faculty members evaluated the program's outcomes by engaging students in structured reflection on the program about its relevance to their future careers as practicing professionals, especially in community-based settings. The students' perceptions were elicited through three sets of reflective assignments following the project. Findings from the reflective assignments suggest that the pilot program was successful in enhancing the students' academic, social, and personal development while building a partnership between the school of nursing and key players in the community, including school-based nurses, teachers, administrators, families, and community leaders. The author suggests that service-learning projects can help nursing students accomplish key developmental tasks of the college years (such as building their competence, autonomy, and integrity), while helping impart the skills and values they will need as they graduate and seek professional nursing roles.

  15. A project for recovering mercury from fluorescent tubes from schools in the Grand Erie District School Board

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-10-15

    Mercury is a persistent, toxic substance that poses a serious threat to the environment and human health. Mercury compounds can be carried hundreds of kilometers once airborne and inhaling mercury vapours or ingesting mercury can cause serious injury or death. In Canada, mercury is regularly found in thousands of products such as fluorescent lamps, thermostats, fever thermometers and button batteries, as well as a variety of industrial applications. This report discussed a project that was undertaken by the Recycling Council of Ontario (RCO) that targeted schools, within the Grand Erie District School Board (GEDSB), to pilot a program over a period of 3 months to track, collect and recycle sufficient number of fluorescent tubes. The purpose was to successfully divert 2200 mgs of mercury that may otherwise be destined for landfill. The primary objective of the pilot project was to establish an operating system to collect and recycle fluorescent tube lighting and develop recycling guidelines for the GEDSB that would be transferable to other school districts. The report discussed why fluorescent lamp recycling was needed and outlined the project partners. One recycling partner's recycling process, Fluorescent Lamp Recyclers (FLR) was described. The report also discussed regulations affecting the handling and disposal of fluorescent lamps in Ontario. GEDSB's, RCO's and FLR's responsibilities in the project were outlined. The methodology and florescent lamp collection process were described. The report also presented the collection schedule and results. It was concluded that with very little effort, significant amounts of fluorescent lamps could be diverted, preventing mercury from entering landfills. refs., tabs., figs., appendices.

  16. Healthier snacks in school vending machines: a pilot project in four Ontario high schools.

    Science.gov (United States)

    Callaghan, Christine; Mandich, Gillian; He, Meizi

    2010-01-01

    The Healthy Vending Machine Pilot Project (HVMPP) was a public health initiative intended to create a healthier school nutrition environment by making healthier snacks available in vending machines, while maintaining a profit margin. The HVMPP was evaluated using quantitative and qualitative measures. Vending machines were stocked with healthier choices and conventional vending products at a 50:50 ratio. The HVMPP was implemented from February to May 2007 in four Ontario secondary schools in Middlesex-London, Elgin, and Oxford counties. Product sales were tracked, and focus groups were conducted to obtain students' opinions about healthy eating and vending choices. "Healthier choice" sales ranged from 14% to 17%. In all schools, vending revenues declined from 0.7% to 66%. A majority of participants had substantial knowledge of healthy eating and were in favour of healthier choices in vending machines; however, price, value, and taste were barriers that led them to purchase these products rarely. Students preferred to have "real" healthy snacks, such as yogurt, fruit, and vegetables, available in schools. Replacing 50% of vending stock with healthier snacks resulted in a decline in vending revenues. Future health programs in schools need to provide "real" healthy snacks, such as low-fat dairy products, fruits, and vegetables.

  17. "I Wish Everyone Had a Library Like This": Year 2 Report on the Baltimore Elementary and Middle School Library Project

    Science.gov (United States)

    Sheldon, Steven B.; Davis, Marcia H.

    2015-01-01

    This report focuses on the opening of new school libraries and their impact on schools, teachers and students after two years of implementation of the Baltimore Elementary and Middle School Library Project (Library Project). The findings build on the first report of this project and show that it is not just new facilities, but also the added…

  18. School, multiliteracies and tecnologies in the portuguese language class: reflections from a project on youtubers

    Directory of Open Access Journals (Sweden)

    Gabriela da Silva Bulla

    2017-12-01

    Full Text Available This paper aims at reflecting on school, multiliteracies and technologies in contemporary society. To this end, we describe and analyze a learning project carried out with a ninth grade class in Portuguese Language classes at a public school in Porto Alegre, Brazil. The project focused on multimodal discourse genres such as Youtuber video and written dissertation. We highlight the importance of working with the promotion of multiliteracies in the school that is committed to the formation of citizens that are able to circulate critically through the cybercultural and mediatic spheres inherent in the network society.

  19. CERN SUMMER SCHOOL 2015 PROJECT REPORT

    CERN Document Server

    Jin, Zizhuo Tony

    2015-01-01

    The context of this internship is the CERN summer student program for the year 2015. As a member of the CERN summer school, I have been assigned, in addition to the classes I attended in the morning, a scientific project within the BE-ABP-HSC section. This work was done under the directions of Benoit Salvant and Nicolo Biancacci whom I thank greatly for their help, patience and teaching. The project consisted in observing the effects generated by the beam passing through various devices. We focused mainly on the electromagnetic waves generated by beams of particles travelling along two of the accelerator's devices: A wire scanner and the TDI (LHC injection beam stopper). These Simulations are of importance to estimate the effect of the beam onto the surrounding apparatus and ensuring both that the latter doesn't get damaged and that the beam doesn't lose too much energy. All the models and simulations were done using c CST STUDIO SUITE software developed by the c CST company.

  20. Indoor climate quality after renovation for improved energy efficiency

    DEFF Research Database (Denmark)

    Gunnarsen, Lars Bo; Løck, Sebastian; Kolarik, Barbara

    2016-01-01

    The building sector is responsible for approximately 40 % of the Danish energy consumption. As every year less than 1 % of the building stock is rebuild after demolition of old buildings, improved energy efficiency of existing buildings are in focus. In the late seventies to mid-eighties unwise...... performance. The indoor quality classifications show minor improvements. By using design tools beyond the simple legal requirements, the rental dwelling marked is a far step ahead of most retrofitting of owner-occupied dwellings and houses. The fear of indoor climate degradation from retrofitted energy saving...... measures may be countered by the use of modern design tools and attention to inner moisture membranes and needs for renovation of ventilation systems....

  1. The Planning, Implementation and Evaluation of a Character-Based School Culture Project in Taiwan

    Science.gov (United States)

    Lee, Chi-Ming

    2009-01-01

    This study focused on the planning, implementation and evaluation of a character-based school culture (CBSC) project in Taiwan. The project integrated the principles of justice, caring and developmental discipline and was influenced by several well-known American models of character education programmes. The CBSC project was conducted in a…

  2. The School Children Mental Health in Europe (SCMHE) Project: Design and First Results

    OpenAIRE

    Kovess, Viviane; Carta, Mauro Giovanni; Pez, Ondine; Bitfoi, Adina; Ko?, Ceren; Goelitz, Dietmar; Kuijpers, Rowella; Lesinskiene, Sigita; Mihova, Zlatka; Otten, Roy

    2015-01-01

    Background : The School Children Mental Health in Europe (SCMHE) project aims to build up a set of indicators to collect and monitor children's mental health in an efficient and comparable methodology across the EU countries. It concerns primary schools children aged 6 to 11 years a range where few data are available whereas school interventions are promising. Methods : Three informants were used: parents, teachers and children. In selecting instruments language, instruments were selected acc...

  3. The Pedagogic Project as Provocative of the Collective Work in the School

    OpenAIRE

    Elaine Sampaio Araujo

    2007-01-01

    The objective of this article is to discuss, starting from the historical-cultural perspective, the sense of a pedagogic project considering its procedural nature, the convergence of the personal and collective dimensions and the educational purpose. The goal is to notice the project as possibility in the field pragmatic and in the theory of the sciences of human formation, linking the human development with the schools and its projects. For that, it tries to demonstrate that pedagogic projec...

  4. Charting a Path to Graduation. The Effect of Project GRAD on Elementary School Student Outcomes in Four Urban School Districts

    Science.gov (United States)

    Snipes, Jason C.; Holton, Glee Ivory; Doolittle, Fred

    2006-01-01

    In the past decade, school districts around the country have sought to improve struggling urban high schools, where high dropout rates, poor student achievement, and low rates of graduation and college-going remain all too prevalent. In a field crowded with reform initiatives, Project Graduation Really Achieves Dreams (GRAD) stands out as…

  5. Barriers and Potential Solutions for Energy Renovation of Buildings in Denmark

    DEFF Research Database (Denmark)

    Meyer, Niels I; Mathiesen, Brian vad; Hvelplund, Frede

    2014-01-01

    the supply and demand side for heat, electricity and transport. Implementing such Smart Energy Systems requires integrated strategic energy planning on the national and local level. With the fundamental changes in the energy supply technologies expected during the coming years, it is important to synchronize...... investments in energy conservation measures with investments in the supply side, in order to avoid overinvestment in supply systems and thus to minimize the total costs of the transformation to Smart Energy Systems. This paper highlights some of the most important barriers for renovation of existing buildings...

  6. Energias renováveis nos edifícios de Museus : contribuição para a preservação ambiental

    OpenAIRE

    Mendes, Manuel Cardoso Furtado

    2012-01-01

    Trata-se de um artigo na área da Museologia, onde relacionamos a responsabilidade social dos Museus com a aplicação das energias renováveis aos seus edifícios, quer existentes ou a construir de raiz. Apresentamos as energias renováveis cuja tecnologia de captação e produção estão tecnologicamente desenvolvidas e prontas a serem utilizadas, dando relevo àquelas que mais se adequem na aplicação direta aos edifícios de Museus, de modo a contribuir-se por esta via para a sustentabilidade e pre...

  7. American Government. Nevada Competency-Based Adult High School Diploma Project.

    Science.gov (United States)

    Nevada Univ., Las Vegas. Coll. of Education.

    This document is one of ten curriculum guides developed by the Nevada Competency-Based Adult High School Diploma (CBAHSD) Project. This curriculum guide on American government is divided into fourteen topics. The topics included are: definition of "State"; left to right political spectrum; Dictatorship vs. Democracy; Capitalism,…

  8. Evaluation Tool for the Application of Discovery Teaching Method in the Greek Environmental School Projects

    Science.gov (United States)

    Kalathaki, Maria

    2015-01-01

    Greek school community emphasizes on the discovery direction of teaching methodology in the school Environmental Education (EE) in order to promote Education for the Sustainable Development (ESD). In ESD school projects the used methodology is experiential teamwork for inquiry based learning. The proposed tool checks whether and how a school…

  9. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  10. Innovative use of ICT in schools based on the findings in ELFE project

    NARCIS (Netherlands)

    Frederiksson, Ulf; Jedeskog, Gunilla; Plomp, T.

    2008-01-01

    The European e-Learning Forum for Education (ELFE) is a project initiated by the ETUCE (European Trade Union Committee on Education). An important objective of the project has been to study good experiences with implementing the use of ICT in schools. This objective has been broken down in seven

  11. Client’s flexibility in renovation projects with long-term DBFMO contracts

    NARCIS (Netherlands)

    Kuhlmann, M.; Blokhuis, E.G.J.; Han, Q.; Schaefer, W.F.; Yildiz, H.T.

    2009-01-01

    Construction project clients are faced with long-term commitments when opting for a DBFMO contract, the Dutch version of PFI. This way of contracting is characterized by the delivery of a full housing service to the client over a period of decades, offered by a construction consortium including

  12. Desarrollo e implantación de energías renovables: situación actual y tendencias

    OpenAIRE

    Picó Heras, Sergio

    2002-01-01

    En esta tesina se tratarán las posibilidades que ofrecen las energías renovables com base de una planificicación energética. El tema se enfocará tanto desde puntos de vista económicos, ambientales, técnicos, políticos, etc

  13. Education in the radioactivity field: a project for the italian schools

    International Nuclear Information System (INIS)

    Venoso, G.; Bertucci, A.; Balzano, E.; Giberti, G.; Pugliese, M.; Roca, V.; Romano, M.; Venoso, G.; Balzano, E.; D'Onofrio, A.; Gialanella, L.; Giberti, G.; Pugliese, M.; Roca, V.; Romano, M.; Sabbarese, C.; D'Onofrio, A.; Sabbarese, C.; Bertucci, A.

    2006-01-01

    Environmental topics are today at the centre of the public attention, but people mostly does not have cultural tools for an adequate knowledge. The radioactivity, in particular, is generally misunderstood and this had negatively influence debate about the energy. To fill this gap science subjects need to be study in school with a more efficient approach. Many efforts have spent to obtain this goal: in this framework the Envirad project was developed with the aim to make students of high schools of Campania Region (south-Italy) able to practice experimental method involving directly them in a real environmental physics experiment [1]. The aim of this project, developed by the grant of the Istituto Nazionale di Fisica Nucleare, is that the effective experimental activity is the best way to provide for an adequate scientific background. (N.C.)

  14. Application of Updated Construction and Demolition Waste Reduction Policy to Army Projects

    Science.gov (United States)

    2015-12-01

    recovering materials for reuse and recycling from demolition, new construction, and renovation and repurposing projects. In its efforts to improve the...Building contents; reuse and recycling potential (including the follow- ing specific materials, products and components that are potentially re- usable...conventional demolition. Implement deconstruction wherever markets or on-site reuse opportunities exist or are anticipated.  Page 24, 3-7 REDUCE

  15. Research and Development Projects with ICT and students as learning designers in Primary Schools

    DEFF Research Database (Denmark)

    Levinsen, Karin; Sørensen, Birgitte Holm; Tosca, Susana

    2014-01-01

    In this paper we present some methodological challenges that emerged during the process of shaping the research design for the comprehensive and complex research project Children as learning designers in a digital school. The project is the realization of our proposal to a research call from...... to the need to strengthen the populations’ digital literacy and 21st century competencies. The call’s scope was research and development projects as pilot school experiments in relation to five selected areas. The selected projects should contribute with new generalizable and practice oriented knowledge...... of how: • ICT supports students learning, • ICT release time for more teaching, and • teachers digital literacy impact on the role of ICT in the educational practice. Further the call required collaboration between universities and university colleges in order to disseminate knowledge and new practices...

  16. Variables that impact the implementation of project-based learning in high school science

    Science.gov (United States)

    Cunningham, Kellie

    Wagner and colleagues (2006) state the mediocrity of teaching and instructional leadership is the central problem that must be addressed if we are to improve student achievement. Educational reform efforts have been initiated to improve student performance and to hold teachers and school leaders accountable for student achievement (Wagner et al., 2006). Specifically, in the area of science, goals for improving student learning have led reformers to establish standards for what students should know and be able to do, as well as what instructional methods should be used. Key concepts and principles have been identified for student learning. Additionally, reformers recommend student-centered, inquiry-based practices that promote a deep understanding of how science is embedded in the everyday world. These new approaches to science education emphasize inquiry as an essential element for student learning (Schneider, Krajcik, Marx, & Soloway, 2002). Project-based learning (PBL) is an inquiry-based instructional approach that addresses these recommendations for science education reform. The objective of this research was to study the implementation of project-based learning (PBL) in an urban school undergoing reform efforts and identify the variables that positively or negatively impacted the PBL implementation process and its outcomes. This study responded to the need to change how science is taught by focusing on the implementation of project-based learning as an instructional approach to improve student achievement in science and identify the role of both school leaders and teachers in the creation of a school environment that supports project-based learning. A case study design using a mixed-method approach was used in this study. Data were collected through individual interviews with the school principal, science instructional coach, and PBL facilitator. A survey, classroom observations and interviews involving three high school science teachers teaching grades 9

  17. Soil and minespoil fill as media for renovation of nitrogen and phosphorus in domestic wastewater

    International Nuclear Information System (INIS)

    Peterson, C.E.; Reneau, R.B. Jr.; Hagedorn, C.

    1998-01-01

    Development of US Appalachian coal mining regions has been hampered by lack of domestic waste disposal technologies suited to fills. The suitability of on-site wastewater treatment and disposal systems (OSWTDS) in fill material is uncertain due to the effects of surface mining on soil physical properties. This research evaluated the potential for renovation of N and P present in domestic wastewater by fills from mining operations. N and P were chosen because of their potential adverse environmental impacts. Soil-fill (a mixture of Jefferson, fine-loamy, siliceous, mesic Typic Hapludult and Muskingom, fine-loamy, mixed, mesic Typic Dystrochrept soils) and minespoil (spoil)-fill (blasted rock material associated with the Taggart Marker and Low Splint Bench coal seams of the Upper Middle Wise Formation) were used. Septic tank effluent (STE) and sand filter effluent (SFE) were applied to spoil-fill columns at four loading rates and spoil-fill columns at one loading rate for a period of 20 wk. Renovation of wastewater was assessed by determining the concentration of N and P present in column leachate. Reduction of inorganic N(NO 3 - + NH 4 + ), based on N/Cl ratios ranged from 14.9 to 32.1% after the varying application rates of STE and SFE passed through the soil columns. However, leachate NO 3 - -N concentrations were still above the 10 mg -1 drinking water standard. The quantity of P emerging from the spoil-fill columns (3.0 mg PL -1 ) was higher than anticipated and may be related to the indigenous P present in the minespoil. Sorption of P in the spoil-fill column decreased with increased STE and SFE application (reduction ranged from 99.1 to 74.4%). Results from this study indicate that there is potential for renovating wastewater in OSWTDS in selected soil-fill areas in reclaimed minelands. 33 refs., 2 figs., 4 tabs

  18. Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools

    Energy Technology Data Exchange (ETDEWEB)

    Coughlin, J.; Kandt, A.

    2011-10-01

    This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

  19. Analysis of Solar Energy Use for Multi-Flat Buildings Renovation

    Directory of Open Access Journals (Sweden)

    Kęstutis Valančius

    2016-10-01

    Full Text Available The paper analyses the energy and financial possibilities to install renewable energy sources (solar energy generating systems when renovating multi-flat buildings. The aim is to analyse solar energy system possibilities for modernization of multi-flat buildings (5-storey, 9-storey and 16-storey, providing detailed conclusions about the appropriateness of the energy systems and financial aspects. It is also intended to determine the optimal technological combinations and solutions to reach the maximum energy benefits. For the research computer simulation tools “EnergyPRO” and “PV*SOL Premium” are chosen. Also actual collected heat and electricity consumption data is used for the analysis.

  20. EKF-GPR-Based Fingerprint Renovation for Subset-Based Indoor Localization with Adjusted Cosine Similarity.

    Science.gov (United States)

    Yang, Junhua; Li, Yong; Cheng, Wei; Liu, Yang; Liu, Chenxi

    2018-01-22

    Received Signal Strength Indicator (RSSI) localization using fingerprint has become a prevailing approach for indoor localization. However, the fingerprint-collecting work is repetitive and time-consuming. After the original fingerprint radio map is built, it is laborious to upgrade the radio map. In this paper, we describe a Fingerprint Renovation System (FRS) based on crowdsourcing, which avoids the use of manual labour to obtain the up-to-date fingerprint status. Extended Kalman Filter (EKF) and Gaussian Process Regression (GPR) in FRS are combined to calculate the current state based on the original fingerprinting radio map. In this system, a method of subset acquisition also makes an immediate impression to reduce the huge computation caused by too many reference points (RPs). Meanwhile, adjusted cosine similarity (ACS) is employed in the online phase to solve the issue of outliers produced by cosine similarity. Both experiments and analytical simulation in a real Wireless Fidelity (Wi-Fi) environment indicate the usefulness of our system to significant performance improvements. The results show that FRS improves the accuracy by 19.6% in the surveyed area compared to the radio map un-renovated. Moreover, the proposed subset algorithm can bring less computation.

  1. EKF–GPR-Based Fingerprint Renovation for Subset-Based Indoor Localization with Adjusted Cosine Similarity

    Science.gov (United States)

    Yang, Junhua; Li, Yong; Cheng, Wei; Liu, Yang; Liu, Chenxi

    2018-01-01

    Received Signal Strength Indicator (RSSI) localization using fingerprint has become a prevailing approach for indoor localization. However, the fingerprint-collecting work is repetitive and time-consuming. After the original fingerprint radio map is built, it is laborious to upgrade the radio map. In this paper, we describe a Fingerprint Renovation System (FRS) based on crowdsourcing, which avoids the use of manual labour to obtain the up-to-date fingerprint status. Extended Kalman Filter (EKF) and Gaussian Process Regression (GPR) in FRS are combined to calculate the current state based on the original fingerprinting radio map. In this system, a method of subset acquisition also makes an immediate impression to reduce the huge computation caused by too many reference points (RPs). Meanwhile, adjusted cosine similarity (ACS) is employed in the online phase to solve the issue of outliers produced by cosine similarity. Both experiments and analytical simulation in a real Wireless Fidelity (Wi-Fi) environment indicate the usefulness of our system to significant performance improvements. The results show that FRS improves the accuracy by 19.6% in the surveyed area compared to the radio map un-renovated. Moreover, the proposed subset algorithm can bring less computation. PMID:29361805

  2. Renewable energy: Political momentum and technology for a sustainable Mexico; Energias Renovables: Impulso politico y tecnologico para un Mexico sustentable

    Energy Technology Data Exchange (ETDEWEB)

    Romero Hernandez, Sergio; Romero Hernandez, Omar; Wood, Duncan [Instituto Tecnologico Autonomo de Mexico (ITAM) (Mexico)

    2011-04-15

    The renewable energy sector in Mexico, as shown in this book, is alive and in good condition, prospers and has great potential. In this regard, it is essential that Mexico sees itself as a country with an energy future beyond Cantarell, beyond Pemex and beyond oil. The future of renewable energy offers great hope for the country and the region, and the time is right for a consensus government, business and social more strongly boost the development of this sector. This book discusses the following topics: Renewable energy and sustainable economic development, the regulatory framework for the use of renewable energy, hydropower, bioenergy, Part I: biomass and biogas, bioenergy, Part II: Liquid biofuels; elements for promotion of wind energy in Mexico, geothermal energy, solar PV, solar thermal and micro. [Spanish] El sector de la energia renovable en Mexico, como se muestra en este libro, esta vivo y en buenas condiciones, prospera y tiene gran potencial. En ese sentido, resulta indispensable que Mexico se vea a si mismo como un pais con un futuro energetico mas alla de Cantarell, mas alla de PEMEX, mas alla del petroleo. El futuro de la energia renovable ofrece una gran esperanza para el pais y la region, y el tiempo es adecuado para que una concertacion gubernamental, empresarial y social impulse con mas fuerza el desarrollo de este sector. En este libro se analizan los siguientes temas: Energias renovables y desarrollo economico sustentable; el marco normativo de la utilizacion de las energias renovables; energia hidroelectrica; bioenergia, parte I: biomasa y biogas; bioenergia, parte II: biocombustibles liquidos; elementos para la promocion de la energia eolica en Mexico; energia geotermica; energia solar fotovoltaica; energia solar termica, y la microgeneracion.

  3. [Educational Facilities for Pregnant School-Age Girls in Districts 3, 4, 12, 13, and 18. Project No. 1369. Evaluation of ESEA Title I Projects in New York City 1968-69.

    Science.gov (United States)

    Appel, Yetta; Berken, Ruth R.

    This project for pregnant school age girls is an ESEA Title I program operating in five facilities in Manhattan, Bronx, and Brooklyn. The primary objective of the project was to assist pregnant school age girls complete their education by being able to attend school. Additional objectives included provision of information and training in personal…

  4. Rightsizing Projects for Non-Research-Intensive Schools of Nursing via Academic-Clinical Partnerships.

    Science.gov (United States)

    Kooken, Wendy Carter; Eckhardt, Ann L; McNutt-Dungan, Marianne; Woods, Jonathan

    Most academic-clinical partnerships are described as formal agreements between schools of nursing at research-intensive universities and large teaching hospitals. This article demonstrates less formal versions of academic-clinical partnerships established between a small, private liberal arts university school of nursing and 2 regional clinical agencies. In both exemplars, students, faculty, and staff contributed to evidence-based practice projects. Schools of nursing in non-research-intensive environments can develop right-size academic-clinical partnerships that are beneficial for all parties involved.

  5. How School Facilities Managers and Business Officials Are Reducing Operating Costs and Saving Money. Energy-Smart Building Choices.

    Science.gov (United States)

    Department of Energy, Washington, DC.

    This guide addresses contributions that school facility administrators and business officials can make in an effort to reduce operating costs and free up money for capital improvements. The guide explores opportunities available to utilize energy-saving strategies at any stage in a building's life, from its initial design phase through renovation.…

  6. Comparison and statistical analysis of long-term overheating indices applied on energy renovated dwellings in temperate climates

    DEFF Research Database (Denmark)

    Psomas, Theofanis Ch.; Heiselberg, Per Kvols; Duer, Karsten

    2018-01-01

    -running’ representative dwellings and characteristic climatic conditions of central Europe (Denmark, United Kingdom, Austria and France). Different renovation steps and passive cooling strategies were applied on these case studies creating 66 variants for comfort assessment. The analyses were conducted with the use...

  7. Las energías renovables como oportunidad y desafío para el desarrollo territorial (Valle de Lerma, Salta – Argentina

    Directory of Open Access Journals (Sweden)

    Silvina Belmonte

    2014-03-01

    Full Text Available La evaluación de Energías Renovables se plantea en un contexto de Ordenamiento Territorial del Valle de Lerma (Salta como estrategia para el desarrollo regional y mejora de la calidad de vida y del ambiente. Herramientas de Evaluación Multi-Criterio, aplicaciones de Sistemas de Información Geográfica y técnicas participativas de consulta constituyen el sustento metodológico del trabajo. Los resultados se focalizan en tres puntos: diagnóstico territorial, evaluación del recurso energético y alternativas tecnológicas, y propuestas para la planificación y gestión. En el diagnóstico, las energías renovables fueron identificadas como opciones viables particularmente en cuestiones productivas y de acceso a servicios básicos. La potencialidad de los recursos renovables resultó alta en relación a la radiación solar y recurso hidráulico, moderado para el potencial eólico y de alta diversidad para el tema de biomasa. Entre las medidas de eficiencia y tecnologías evaluadas, surgieron como prioritarias: educación ambiental, planificación energética estratégica y variadas aplicaciones de energía solar (secaderos, invernaderos, arquitectura bioclimática, colectores de agua y cocinas. Entre las orientaciones para el desarrollo de políticas energéticas ‘más’ sustentables se destacaron: coordinación del sector energético con otros sectores y niveles de actuación en el marco de una planificación territorial integral, fortalecimiento de instituciones locales para la gestión energética, y superación de barreras – limitaciones a la transferencia de energías renovables y medidas de eficiencia energética a nivel local. Finalmente, en las conclusiones se plantea la importancia de valorar las energías renovables como oportunidad y desafío para promover procesos de ‘cambio’ en la región, en una concepción más comprometida con el ambiente y la sociedad.

  8. Solar wind monitor—a school geophysics project

    Science.gov (United States)

    Robinson, Ian

    2018-05-01

    Described is an established geophysics project to construct a solar wind monitor based on a nT resolution fluxgate magnetometer. Low-cost and appropriate from school to university level it incorporates elements of astrophysics, geophysics, electronics, programming, computer networking and signal processing. The system monitors the earth’s field in real-time uploading data and graphs to a website every few minutes. Modular design encourages construction and testing by teams of students as well as expansion and refinement. The system has been tested running unattended for months at a time. Both the hardware design and software is published as open-source [1, 10].

  9. Effect of project work on secondary school students science process ...

    African Journals Online (AJOL)

    The study investigated the effect of students' project work on secondary school science process skills acquisition in Biology. The study was carried out in Owerri North Local Government Area of Imo State. Three research questions guided the study and three null hypotheses were postulated and tested at 0.05 level of ...

  10. Educational Interdisciplinarity in the High School through working with Pedagogical Projects

    Directory of Open Access Journals (Sweden)

    Irinéa de Lourdes Batista

    2008-08-01

    Full Text Available In this research, an understanding about scholar interdisciplinarity and project working is brought, aiming at showing that the last one is an alternative methodological to promote an interdisciplinary educative practice. Therefore a pedagogical proposal was built to implement interdisciplinarity in Science and Mathematics Education in High School. It is exposed the theoretical syntheses, analysis and discussions concerning the pertinence and possibility to implement the proposal studied by the teachers and pedagogical staff in a public High School in the State of Paraná, Brazil.

  11. Renewable energies: A real option for the electrical generation in Mexico?; Energias renovables: opcion real para la generacion electrica en Mexico?

    Energy Technology Data Exchange (ETDEWEB)

    Huacuz V, Jorge M. [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2003-07-01

    The renewable energies offer additional benefits to the kilowatts (kW) and kilowatts-hour (kWh) that they produce, because they include the creation of new jobs, a cleaner mean of generation and power assurance, among others. In view of this, most of the countries of the Organization for Economic Cooperation and Development (OECD) and several developing nations have established goals for the renewable energies in their power plans. Many of these countries also have fomented the local development of industries of renewable energy and are penetrating aggressively in this new technology market. [Spanish] Las energias renovables ofrecen beneficios adicionales a los kilowatts (kW) y kilowatts-hora (kWh) que producen, pues incluyen la creacion de nuevos empleos, un medio mas limpio de generacion y seguridad energetica, entre otros. En vista de ello, la mayoria de los paises de la Organizacion de Cooperacion para el Desarrollo Economico (OCDE) y varias naciones en desarrollo han establecido metas para las energias renovables en sus planes energeticos. Muchos de estos paises tambien han fomentado el desarrollo local de industrias de energia renovable y estan penetrando agresivamente en este nuevo mercado de la tecnologia.

  12. Whole School Improvement and Restructuring as Prevention and Promotion: Lessons from STEP and the Project on High Performance Learning Communities.

    Science.gov (United States)

    Felner, Robert D.; Favazza, Antoinette; Shim, Minsuk; Brand, Stephen; Gu, Kenneth; Noonan, Nancy

    2001-01-01

    Describes the School Transitional Environment Project and its successor, the Project on High Performance Learning Communities, that have contributed to building a model for school improvement called the High Performance Learning Communities. The model seeks to build the principles of prevention into whole school change. Presents findings from…

  13. Exploring Marine Ecosystems with Elementary School Portuguese Children: Inquiry-Based Project Activities Focused on "Real-Life" Contexts

    Science.gov (United States)

    Guilherme, Elsa; Faria, Cláudia; Boaventura, Diana

    2016-01-01

    The purpose of the study was to investigate how young students engage in an inquiry-based project driven by real-life contexts. Elementary school children were engaged in a small inquiry project centred on marine biodiversity and species adaptations. All activities included the exploration of an out-of-school setting as a learning context. A total…

  14. Virginia Demonstration Project Encouraging Middle School Students in Pursuing STEM Careers

    Science.gov (United States)

    Bachman, Jane T.; Kota, Dena H.; Kota, Aaron J.

    2011-01-01

    Encouraging students at all grade levels to consider pursuing a career in Science, Technology, Engineering, and Mathematics (STEM) fields i s a national focus. In 2005, the Naval Surface Warfare Center, Dahlgren Division (NSWCDD), a Department of Defense laboratory located in Da hlgren, Virginia, began work on the Virginia Demonstration Project (VDP) with the goal of increasing more student interest in STEM educatio n and pursuing STEM careers. This goal continues as the program enters its sixth year. This project has been successful through the partici pation of NSWCDD's scientists and engineers who are trained as mentor s to work in local middle school classrooms throughout the school year, As an extension of the in-class activities, several STEM summer aca demies have been conducted at NSWCDD, These academies are supported by the Navy through the VDP and the STEM Learning Module Project. These projects are part of more extensive outreach efforts offered by the National Defense Education Program (NDEP), sponsored by the Director, Defense Research and Engineering. The focus of this paper is on the types of activities conducted at the summer academy, an overview of the academy planning process, and recommendations to help support a nati onal plan of integrating modeling and simulation-based engineering and science into all grade levels. based upon the lessons learned

  15. A coordinated school health approach to obesity prevention among Appalachian youth: the Winning with Wellness Pilot Project.

    Science.gov (United States)

    Schetzina, Karen E; Dalton, William T; Lowe, Elizabeth F; Azzazy, Nora; VonWerssowetz, Katrina M; Givens, Connie; Pfortmiller, Deborah T; Stern, H Patrick

    2009-01-01

    Childhood obesity has been an increasing problem in the United States, especially in rural areas. Effective prevention approaches are needed. This article describes the development, implementation, effectiveness, feasibility, and sustainability of a school-based obesity prevention pilot project, Winning with Wellness. The program was based on the coordinated school health model and included a community-based participatory research approach aimed at promoting healthy eating and physical activity in a rural Appalachian elementary school. Findings from this preliminary project revealed improvements in nutrition offerings and increased physical activity during the school day. In addition, the program was found to be acceptable to teachers, successfully implemented utilizing both existing and newly developed resources, and sustainable as evidenced in continued practice and expansion to other area schools.

  16. Failure to Thrive? The Community Literacy Strand of the Additive Bilingual Project at an Eastern Cape Community School, South Africa

    Science.gov (United States)

    Hunt, George

    2007-01-01

    This paper discusses an attempt to establish community literacy procedures in an Eastern Cape community school. The school hosts the Additive Bilingual Education (ABLE) project, a cooperation between UK and South African universities and the school trust. The community literacy strand of the project encourages family members to contribute oral…

  17. Which Type of Inquiry Project Do High School Biology Students Prefer: Open or Guided?

    Science.gov (United States)

    Sadeh, Irit; Zion, Michal

    2012-01-01

    In teaching inquiry to high school students, educators differ on which method of teaching inquiry is more effective: Guided or open inquiry? This paper examines the influence of these two different inquiry learning approaches on the attitudes of Israeli high school biology students toward their inquiry project. The results showed significant…

  18. New roles for mathematics in multi-disciplinary,upper secondary school projects

    DEFF Research Database (Denmark)

    Lindenskov, Lena; Andresen, Mette

    2009-01-01

    A new concept, compulsory multi-disciplinary courses, was introduced in upper secondary school curriculum as a central part of a recent reform. This paper reports from a case study of such a triple/four-disciplinary project in mathematics, physics, chemistry and ‘general study preparation...

  19. Forty project management strategies for the medical practice staff.

    Science.gov (United States)

    Hills, Laura Sachs

    2010-01-01

    Most every medical practice will embark at one time or another on a large and complex new project. The practice may, for instance, undertake a project in office construction or renovation, practice expansion, new technology, or a new large-scale event. The medical practice staff may find itself creating the project plan, overseeing its execution, and working through the plan day to day until its completion. In short, the staff may find itself responsible for project management. This article contains 40 specific, easy-to-implement project management strategies medical practice employees can use to manage both the large and small projects they undertake on behalf of the practice. It suggests effective project management strategies the staff can use before the onset of a new project as well as strategies to help define the project, to deliver the project, and to close and review the project. This article also describes five reasons medical practices often fail at project management and suggests more effective approaches that will ensure that the projects the medical practice undertakes are completed well, on time, and within budget.

  20. Promoting Energy-Balance Behaviors among Ethnically Diverse Adolescents: Overview and Baseline Findings of the Central Texas CATCH Middle School Project

    Science.gov (United States)

    Springer, Andrew E.; Kelder, Steven H.; Byrd-Williams, Courtney E.; Pasch, Keryn E.; Ranjit, Nalini; Delk, Joanne E.; Hoelscher, Deanna M.

    2013-01-01

    The Central Texas Coordinated Approach To Child Health (CATCH) Middle School Project is a 3.5-year school-based project aimed at promoting physical activity (PA), healthy eating, and obesity prevention among public middle school students in Texas. This article describes the CATCH intervention model and presents baseline findings from spring 2009.…

  1. Site Assessment Report/Corrective Action Plan Fuel Hydrant System (Site SS-41) Project DKFX937081R1, Charleston Air Force Base, South Carolina

    National Research Council Canada - National Science Library

    1996-01-01

    ... #4 and the aircraft apron. Limited investigations were performed on those portions of the fuel hydrant system located on the west side of the drainage ditch due to ongoing Navy fuel hydrant system and aircraft apron renovation projects...

  2. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  3. Effects of Implementing STEM-I Project-Based Learning Activities for Female High School Students

    Science.gov (United States)

    Lou, Shi-Jer; Tsai, Huei-Yin; Tseng, Kuo-Hung; Shih, Ru-Chu

    2014-01-01

    This study aims to explore the application of STEM-I (STEM-Imagination) project-based learning activities and its effects on the effectiveness, processes, and characteristics of STEM integrative knowledge learning and imagination development for female high school students. A total of 72 female high school students were divided into 18 teams.…

  4. University of Chicago School Mathematics Project (UCSMP) Algebra. WWC Intervention Report

    Science.gov (United States)

    What Works Clearinghouse, 2009

    2009-01-01

    University of Chicago School Mathematics Project (UCSMP) Algebra is a one-year course covering three primary topics: (1) linear and quadratic expressions, sentences, and functions; (2) exponential expressions and functions; and (3) linear systems. Topics from geometry, probability, and statistics are integrated with the appropriate algebra.…

  5. Comparison of the Effectiveness of Two Forms of the Enhancing Relationships in School Communities Project for Promoting Cooperative Conflict Resolution Education in Australian Primary Schools

    Science.gov (United States)

    Trinder, Margot; Wertheim, Eleanor H.; Freeman, Elizabeth; Sanson, Ann; Richardson, Shanel; Hunt, Sue

    2010-01-01

    This study evaluated the Enhancing Relationships in School Communities (ERIS) Project which aimed to promote constructive conflict resolution (CR) in Australian primary school communities through professional development for core teams of three-five staff (n = 33 teachers). Twelve schools were randomly assigned to a full intervention (FI) group or…

  6. An Analysis of the Supports and Constraints for Scientific Discussion in High School Project-Based Science

    Science.gov (United States)

    Alozie, Nonye M.; Moje, Elizabeth Birr; Krajcik, Joseph S.

    2010-01-01

    One goal of project-based science is to promote the development of scientific discourse communities in classrooms. Holding rich high school scientific discussions is challenging, especially when the demands of content and norms of high school science pose challenges to their enactment. There is little research on how high school teachers enact…

  7. Final report to the Department of Energy: Green Schools Project DE-FC01-99EE10685. Schools for the 21st century: Transferring the Green Schools experience; FINAL

    International Nuclear Information System (INIS)

    Harrigan, Merrilee

    2002-01-01

    This report describes five major activities that the Alliance to Save Energy performed for the years 2000 and 2001 to support and compliment DOE's Energy Smart Schools Partnership. The major tasks under this project were to: (1) Promote the School Efficiency Peer Exchange program for school personnel; (2) develop the Earth Apple Awards program and disseminate the best award-winning ideas; (3) link Green Schools with Rebuilt with at least one metropolitan area such as Philadelphia or Buffalo; (4) support Rebuild/Energy Smart Schools through working at the state level to develop business, state, and local government and through making presentations in support of school efficiency; (5) update the curriculum search originally conducted in 1995

  8. Guidelines for indoor air hygiene in school buildings

    Energy Technology Data Exchange (ETDEWEB)

    Moriske, Heinz-Joern; Szewzyk, Regine (eds.)

    2008-08-15

    The new guidelines for indoor air hygiene in school buildings are intended as a response to current requirements in school practice. The recommendations aim to help to avoid mistakes in modernising school buildings and to provide hygiene-specific support in planning of new school buildings. The guidelines are laid out as follows: (a) In the general section the targets of the guidelines and the target groups are addressed. The current indoor hygiene situation in German schools is described, followed by the parameters with regard to peripheral issues which will not be dealt with further; (b) Part A deals with the hygiene requirements in the practical running of schools. Besides general requirements for maintenance and operation the important issues of cleaning and ventilation are considered, as well as minor building works; (c) Part B provides an overview of important chemical and biological contaminants in schools; (d) Part C looks at building and air conditioning requirements. The important issues of acoustic requirements is also addressed; (e) Part D shows how to deal practically with problem cases and list case studies with 'typical' procedures; (f) Part E provides a brief overview of existing renovation guidelines.

  9. Guidelines for indoor air hygiene in school buildings

    Energy Technology Data Exchange (ETDEWEB)

    Moriske, Heinz-Joern; Szewzyk, Regine [eds.

    2008-08-15

    The new guidelines for indoor air hygiene in school buildings are intended as a response to current requirements in school practice. The recommendations aim to help to avoid mistakes in modernising school buildings and to provide hygiene-specific support in planning of new school buildings. The guidelines are laid out as follows: (a) In the general section the targets of the guidelines and the target groups are addressed. The current indoor hygiene situation in German schools is described, followed by the parameters with regard to peripheral issues which will not be dealt with further; (b) Part A deals with the hygiene requirements in the practical running of schools. Besides general requirements for maintenance and operation the important issues of cleaning and ventilation are considered, as well as minor building works; (c) Part B provides an overview of important chemical and biological contaminants in schools; (d) Part C looks at building and air conditioning requirements. The important issues of acoustic requirements is also addressed; (e) Part D shows how to deal practically with problem cases and list case studies with 'typical' procedures; (f) Part E provides a brief overview of existing renovation guidelines.

  10. UNA REVISIÓN A LA REGLAMENTACIÓN E INCENTIVOS DE LAS ENERGÍAS RENOVABLES EN COLOMBIA

    Directory of Open Access Journals (Sweden)

    DIANA CAROLINA ORTIZ MOTTA

    2012-01-01

    Full Text Available El documento analiza las estrategias de: promoción, producción, desarrollo o adaptación de las energías renovables en el país. El desarrollo de esta investigación partió del actual Plan Energético Nacional en lo referente a los lineamientos en materia de política energética. De igual manera se retomaron los programas, las leyes, los planes y los decretos relacionados con la planeación, ejecución y operación de los proyectos energéticos. La investigación realizada permitió concluir que existen leyes e incentivos, principalmente de carácter tributario, que promueven el desarrollo de las energías renovables. Sin embargo, en el país aún se requiere profundizar en estudios que generen cuantificaciones continuas del potencial de implementación de fuentes no convencionales de energía, de manera que se mejoren las políticas energéticas, permitiendo establecer estrategias de largo plazo que involucren los componentes sociales y ambientales.

  11. Project A+ Elementary Technology Demonstration Schools 1990-91. The First Year.

    Science.gov (United States)

    Marable, Paula; Frazer, Linda

    Project A+ Elementary Technology Demonstration Schools is a program made possible through grants from IBM (International Business Machines Corporation) and Apple, Inc. The primary purpose of the program is to demonstrate the educational effectiveness of technology in accelerating the learning of low achieving at-risk students and enhancing the…

  12. Conformation of an evaluation process for a license renovation solicitude of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Serrano R, M. L.

    2012-10-01

    So that the construction stages, of operation, closing, dismantlement and the radioactive waste disposal of a nuclear power plant (NPP) are carried out in Mexico, is necessary that the operator has a license, permission or authorization for each stage. In Mexico, these licenses, permissions or authorizations are granted by the Energy Secretariat with base in the verdict of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS). The operation licenses ar the moment effective for the reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) they will expire respectively in the year 2020 and 2025 for the Unit 1 and Unit 2, for what the CNSNS has begun its preparation before a potential solicitude of the licensee to continue the operation of the NPP-L V. Defining the process to continue and to generate the documents that would help in this phase as normalization, guides, procedures, regulations, controls, etc., is the task that intends to be carried out the regulator body so that the evaluation process is effective and efficient, so much for the same regulator body as for the licensee. This work exposes the advance that the CNSNS has in this aspect and is centered specifically in the conformation of an evaluation process of license renovation solicitude, taking as base what the regulator body of the United States of North America (US NRC) established and following to the IAEA. Also, this work includes statistical of electric power production in Mexico, licensing antecedents for the NPP-L V, a world perspective of the license renovations and the regulation of the US NRC related to the license renovation of a NPP. (Author)

  13. Project of renewable energy for agriculture; Proyecto de energia renovable para la agricultura

    Energy Technology Data Exchange (ETDEWEB)

    Montufar Avilez, Octavio [FIRCO (Mexico)

    2005-07-01

    The document presents a general design of the hydraulic system, a hydraulic design of cattle ranch and a hydraulic design by dripping. It also discusses the components of the energy project, which are: institutional fortification, promotion and diffusion, market development (studies), specifications and certification, investments, technical support and direction of the project. The objective of this project is to diminish ignorance in the sector, to reduce the investment costs and to obtain a long term-sustainable effect. [Spanish] En este documento se describe un diseno general del sistema hidraulico, un diseno hidraulico de ganaderia, un diseno hidraulico por goteo y los componentes del proyecto de energia que son: fortalecimiento institucional, promocion y difusion, desarrollo del mercado (estudios), especificaciones y certificacion, inversiones, asistencia tecnica y direccion del proyecto. El objetivo de este proyecto es minimizar el desconocimiento en el sector, reducir los costos de inversion y que el efecto sea sostenible a largo plazo.

  14. Massachusetts Institute of Technology School of Chemical Engineering Practice, Brookhaven station: Summary of projects, 1983-1986

    International Nuclear Information System (INIS)

    1987-11-01

    The MIT Graduate School of Chemical Engineering Practice stresses engineering problem solving. The Practice School program, as it is commonly called, develops in a unique and particularly effective way the student's ability to apply fundamentals to problems in the chemical industry and thus accelerates one's professional development. The themes of atomization, emthanol production and utilization, hydrogen production and compression, localized electrochemical corrosion and biochemical engineering reflect some of the major programs at the Laboratory. The titles of all the projects are listed in chronological order in the index at the end of this document. Brief summaries are presented for each project with related projects grouped together

  15. Demonstrating leadership inside and out : green building project trains employees, educates clients

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-01-15

    This article described a full-scale green renovation project undertaken by a construction management firm in Newton, Massachusetts. Chapman Construction and Design began renovating its own office building in late 2007 and completed it in September 2008. The firm set out to achieve LEED Platinum certification from the United States Green Building Council. The project involved energy saving modifications to its mechanical systems; replacing plumbing fixtures with high efficiency alternatives to reduce water consumption by at least 40 per cent; installing skylights and additional windows to allow more natural light into the interior space; salvaging doors, lighting, metal studs and masonry whenever possible; and using sustainable products such as recyclable carpets, tiles and low-VOC paint. The main feature of the renovation was a new 47 kW (DC) photovoltaic (PV) solar power array installed on the rooftop. The PV array includes 208 panels and a SunPower SPR-225 system that produces 55,000 kWh of clean power per year. This grid connected system will supply 90 per cent of the company's electricity needs. During times of peak production, excess power will be sent back to the utility. This article also described the 3 different roofing systems upon which the PV system was installed. All of the roofing systems were manufactured by the Firestone Building Products Company and included an innovative and highly reflective white thermoplastic polyolefin (TPO) single-ply roofing system; a RubberGard EPDM roofing system that was coated with Firestone's white AcryliTop coating which exceeds Energy Star requirements for energy efficiency; and a 1.5 mm Firestone UltraPly TPO membrane. The easy to install roofing systems were designed to prolong the service life of the roof and reflect solar radiation. 1 ref., 2 figs.

  16. Final Environmental Assessment to Renovate Fourth Cliff Recreational Area at Hanscom Air Force Base, Massachusetts

    Science.gov (United States)

    2014-11-17

    Renovate Fourth Cliff Recreational Annex Grading and topography changes may be necessary to design an appropriate drainage system at the site...goals: 1) Increase safety for personnel and patrons at the site; 2) Provide protection of the exposed cliff face from rainwater runoff; 3) Provide...be followed. Drainage design must meet Massachusetts Stormwater Management Standards, as well as comply with the Federal Clean Water Act. Solid

  17. William H. Taft High School Project HOLA 1983-1984. O.E.A. Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.

    This report evaluates Project HOLA, in its first year of funding, which provides instruction in English as a second language, Spanish language skills, and bilingual instruction in mathematics, science, and social studies to approximately 230 students in a high school in Bronx, New York. The report examines the project's long- and short-range…

  18. Astronomy and Space Science On The School - An Outreach Project for Elementary and High School Students of Brasilia

    Science.gov (United States)

    Ferreira, Jose Leonardo

    2016-07-01

    This project aims to develop interdisciplinary actions, articulated and convergence in the field of education, dissemination and popularization of science and technology in Brasilia-DF, the Federal District of Brazil. These actions are also been carried out at DF surroundings areas. Since 2015 linked convergent actions are focused on the development of space science and astronomy teaching with hands on experimental activities. Workshops, short basic astronomy courses, expositions and planetarium show are been carried out by a team of professors, graduate and under graduate students from University of Brasilia- UnB. At the same time upgrade actions are been done in order to modernize The Luiz Cruls Astronomical Observatory located at the far campus of UnB, named Fazenda Água Limpa. It is now a Center for research and space science dissemination and popularization not only for students but also for the whole community of Brasilia. Working toghether with the Physics Institute of UnB we have the recently created Museum of Science and Technology of Brasilia, also located at the UnB campus. The Museum is responsible for contac with schools and Brasilia community and for the organization of the activities of the Science on the School Project. Science on the School is an educational, scientific and cultural proposal approved and financed by the brazillian national research council (CNPq) and by the Science and Technology Reseach Foundation of Brasilia. Besides science dissemination for the brazillian society the project is also developing theoretical and experimental research in the area of Space Science and Astronomy. The project also aim to transform the Museum in a strong Science Education Center for the Brazil central region population, It is going to be a cultural environment and leisure for the Federal District and surrounding areas of Brasilia. In this work we will describe the coordinate actions of The Luiz Cruls Astronomical Observatory the Physics Institute of

  19. A Project-Based Engineering and Leadership Workshop for High School Students

    Science.gov (United States)

    Ryder, Linda Sue; Pegg, Jerine; Wood, Nathan

    2012-01-01

    Summer outreach programs provide pre-college participants an introduction to college life and exposure to engineering in an effort to raise the level of interest and bring more students into engineering fields. The Junior Engineering, Mathematics, and Science (JEMS) program is a project-based summer workshop in which teams of high school students…

  20. William H. Taft High School Project HOLA 1984-1985. O.E.A. Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    In 1984-85, Project HOLA was in its second year of funding at William H. Taft High School in the Bronx, New York. HOLA serves Spanish-speaking students of limited English proficiency (LEP). Project goals include speedy acquisition of English skills, orientation to life in America, maintenance and improvement of Spanish skills and cultural…