  1. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  2. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  3. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  4. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  5. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  6. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  7. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  8. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  9. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  10. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  11. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  12. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  13. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  14. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  15. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  16. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  17. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  18. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  19. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  20. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  1. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  2. CERN confirms LHC schedule

    CERN Document Server

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  3. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  4. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  5. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  6. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  7. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  8. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  9. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  10. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  11. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  12. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  13. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  14. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  15. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  16. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  17. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  18. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  19. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  20. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  1. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  2. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  3. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  4. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  5. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  6. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  7. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  8. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  9. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  10. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  11. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  12. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  13. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  14. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  15. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  16. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    . The rostering process is non-trivial and especially when service is required around the clock, rostering may involve considerable effort from a designated planner. Therefore, in order to minimize costs and overstaffing, to maximize the utilization of available staff, and to ensure a high level of satisfaction...... as possible to the available staff, while respecting various requirements and rules and while including possible transportation time between tasks. This thesis presents a number of industrial applications in rostering and task scheduling. The applications exist within various contexts in health care....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied...

  17. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  18. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  19. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  20. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  1. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  2. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  3. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  4. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  5. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  6. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  7. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  8. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  9. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  10. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  11. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  12. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  13. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  14. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  15. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  16. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  17. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  18. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  19. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  20. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  1. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  2. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  3. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  4. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different....... Compared to the predictions of an analyst observing untolled equilibrium and taking scheduling preferences as exogenous, we find that both the optimal capacity and the marginal external cost of congestion have changed. The benefits of tolling are greater, and the optimal time varying toll is different....

  5. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  6. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  7. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  8. How useful are preemptive schedules?

    NARCIS (Netherlands)

    Brucker, P.; Heitmann, S.; Hurink, J.L.

    2001-01-01

    Machine scheduling admits two options to process jobs. In a preemptive mode processing may be interrupted and resumed later even on a different machine. In a nonpreemptive mode interruptions are not allowed. Usually, the possibility to preempt jobs leads to better performance values. However, also

  9. Interaction in activity location scheduling

    NARCIS (Netherlands)

    Tabak, V.; Vries, de B.; Dijkstra, J.; Jessurun, A.J.

    2006-01-01

    In this paper we discuss the interaction in activity location scheduling which is the main subject of an ongoing research project called "User Simulation of Space Utilization". The aim of this research project is to develop an overall model for the simulation of human movement and utilization of

  10. Scheduling with target start times

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.; Klein Haneveld, W.K.; Vrieze, O.J.; Kallenberg, L.C.M.

    1997-01-01

    We address the single-machine problem of scheduling n independent jobs subject to target start times. Target start times are essentially release times that may be violated at a certain cost. The goal is to minimize an objective function that is composed of total completion time and maximum

  11. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  12. Flexible Schedules and Shift Work.

    Science.gov (United States)

    Beers, Thomas M.

    2000-01-01

    Flexible work hours have gained prominence, as more than 25 million workers (27.6% of all full-time workers) can now vary their schedules. However, there has been little change since the mid-1980s in the proportion who work a shift other than a regular daytime shift. (JOW)

  13. Scheduling periodic tasks with slack

    NARCIS (Netherlands)

    Korst, J.H.M.; Aarts, E.H.L.; Lenstra, J.K.

    1997-01-01

    We consider the problem of nonpreemptively scheduling periodic tasks on a minimum number of identical processors, assuming that some slack is allowed in the time between successive executions of a periodic task. We prove that the problem is NP-hard in the strong sense. Necessary and sufficient

  14. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    replace earlier versions of the F/A-18. Joint and International Nature At the time of JSF conception, there was a clear preference at the highest levels...ALPHABET SOUP ” (Aboulafia, 2015) OF STUDIES AND CONCEPTS • … MERGED INTO JAST • … WHICH EVOLVED TO JSF • WELL-KNOWN COST AND SCHEDULE

  15. Analyzing NPS Scheduling Using OSIRIS

    Science.gov (United States)

    1993-03-01

    School TEACHER SCHEDULE BLOCKS REPORT Date: 2/19/93 Period Name ID Term Days 1234 Adragna , Joe 170401 1 F xx Agrawal, Brij 120101 1 F xx Almquist...LOAD REPORT Date: 3/18/93 Total Max Consec Total Teacher ID Term Classes Classes Stud Adragna , Joe 170401 1 1 1 3 Agrawal, Brij 120101 1 2 2 98 Aiello

  16. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  17. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  18. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker cons...... consumption and the impact on the remaining network and the customer service level. The model is applied to 4 real cases from Maersk Line. Solutions are comparable or superior to those chosen by operations managers. Cost savings of up to 58% may be achieved.......Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  19. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  20. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  1. Preemptive scheduling in overloaded systems

    Czech Academy of Sciences Publication Activity Database

    Chrobak, M.; Epstein, L.; Noga, J.; Sgall, Jiří; van Stee, R.; Tichý, Tomáš; Vakhania, N.

    2003-01-01

    Roč. 67, č. 1 (2003), s. 183-197 ISSN 0022-0000 R&D Projects: GA ČR GA201/01/1195; GA MŠk ME 476; GA AV ČR IAA1019901; GA MŠk LN00A056 Institutional research plan: CEZ:AV0Z1019905; CEZ:AV0Z1019905 Keywords : scheduling * online algorithms * benefit Subject RIV: BA - General Mathematics Impact factor: 0.795, year: 2003

  2. WCET Analysis for Preemptive Scheduling

    OpenAIRE

    Altmeyer, Sebastian; Gebhard, Gernot

    2008-01-01

    Hard real-time systems induce strict constraints on the timing of the task set. Validation of these timing constraints is thus a major challenge during the design of such a system. Whereas the derivation of timing guarantees must already be considered complex if tasks are running to completion, it gets even more complex if tasks are scheduled preemptively -- especially due to caches, deployed to improve the average performance. In this paper we propose a new method to compu...

  3. Scheduling Maintenance Jobs in Networks

    OpenAIRE

    Abed, Fidaa; Chen, Lin; Disser, Yann; Groß, Martin; Megow, Nicole; Meißner, Julie; Richter, Alexander T.; Rischke, Roman

    2017-01-01

    We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time; for the special case of path networks, this is related to the problem of minimizing the busy time of machines. We show that the problem can be solved in polynomial time in arbitrary networks if preemption is allowed. If preemption is restricted to integral t...

  4. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  5. Broadcast scheduling for mobile advertising

    OpenAIRE

    De Reyck, B.; Degraeve, Z.

    2003-01-01

    We describe a broadcast scheduling system developed for a precision marketing firm specialized in location-sensitive permission-based mobile advertising using SMS (Short Message Service) text messaging. Text messages containing advertisements were sent to registered customers when they were shopping in one of two shopping centers in the vicinity of London. The ads typically contained a limited-time promotional offer. The company's problem was deciding which ads to send out to which customers ...

  6. Schedule of the nuclear program

    International Nuclear Information System (INIS)

    Heigl, F.

    1977-01-01

    The lecure tries to explain the main phases which must be passed to establish nuclear power plants, the feasibility phase, preconstruction and construction phase. Each phase consists of a lot of activities which are commented. Further the lecture tries to give some ideas of durances and dependence between the phases or activities to get a complete time schedule of the realization of a nuclear power project. (HP) [de

  7. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  8. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  9. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  10. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  11. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  12. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  13. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  14. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  15. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  16. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  17. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  18. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  19. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  20. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  1. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  2. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  3. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  4. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  5. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  6. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  7. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  8. Optimizing Unmanned Aircraft System Scheduling

    Science.gov (United States)

    2008-06-01

    ASC-U uses a deterministic algorithm to optimize over a given finite time horizon to obtain near-optimal UAS mission area assignments. ASC-U...the details of the algorithm . We set an upper bound on the total number of schedules that can be generated, so as not to create unsolvable ILPs. We...COL_MISSION_NAME)) If Trim( CStr (rMissions(iRow, COL_MISSION_REQUIRED))) <> "" Then If CLng(rMissions(iRow, COL_MISSION_REQUIRED)) > CLng

  9. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  10. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  11. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  12. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  13. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  14. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  15. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  16. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event is availa......CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event...... is available. The CHI'13 Interactive Schedule helps attendees navigate this wealth of video content in order to identify events they would like to attend. It consists of a number of large display screens throughout the conference venue which cycle through a video playlist of events. Attendees can interact...

  17. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  18. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  19. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  20. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  1. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  2. Management of Temporal Constraints for Factory Scheduling.

    Science.gov (United States)

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  3. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  4. Trustable Virtual Machine Scheduling in a Cloud

    OpenAIRE

    Hermenier , Fabien; Henrio , Ludovic

    2017-01-01

    International audience; In an Infrastructure As A Service (IaaS) cloud, the scheduler deploys VMs to servers according to service level objectives (SLOs). Clients and service providers must both trust the infrastructure. In particular they must be sure that the VM scheduler takes decisions that are consistent with its advertised behaviour. The difficulties to master every theoretical and practical aspects of a VM scheduler implementation leads however to faulty behaviours that break SLOs and ...

  5. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  6. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  7. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  8. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  9. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  10. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  11. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  12. 15 CFR 700.14 - Preferential scheduling.

    Science.gov (United States)

    2010-01-01

    ...) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Industrial Priorities § 700.14 Preferential scheduling. (a) A...

  13. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  14. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  15. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  16. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  17. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  18. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  19. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  20. A dynamic approach to vehicle scheduling

    NARCIS (Netherlands)

    D. Huisman (Dennis); R. Freling (Richard); A.P.M. Wagelmans (Albert)

    2001-01-01

    textabstractThis paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our

  1. State Teacher Salary Schedules. Policy Analysis

    Science.gov (United States)

    Griffith, Michael

    2016-01-01

    In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…

  2. Evolutionary Scheduler for the Deep Space Network

    Science.gov (United States)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  3. Decay-usage scheduling in multiprocessors

    NARCIS (Netherlands)

    Epema, D.H.J.

    1998-01-01

    Decay-usage scheduling is a priority-aging time-sharing scheduling policy capable of dealing with a workload of both interactive and batch jobs by decreasing the priority of a job when it acquires CPU time, and by increasing its priority when it does not use the (a) CPU. In this article we deal with

  4. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  5. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... domestic law and international conventions and agreements adopted by the United States; such terminal... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  6. 21 CFR 1308.13 - Schedule III.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III. 1308.13 Section 1308.13 Food and... opposite it. (b) Stimulants. Unless specifically excepted or unless listed in another schedule, any... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical...

  7. Management Matters. Changing to Flexible Scheduling

    Science.gov (United States)

    Pappas, Marjorie L.

    2005-01-01

    Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…

  8. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  9. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  10. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction and Schedule After nearly seven months of concentrated effort, the installation of services on YB0 moved off the CMS critical path in late November. In line with v36 planning provisions, the additional time needed to finish this challeng¬ing task was accommodated by reducing sequential dependencies between assembly tasks, putting more tasks (especially heavy logistic movements) in parallel with activities on, or within, the central wheel. Thus the lowering of wheels YB-1 and YB -2 and of disk YE-3 is already complete, the latter made possible, in the shadow of YB0 work, by inverting the order of the 3 endcap disks in the surface building. Weather conditions permitting, the Tracker will be transported to point 5 during CMS week for insertion in EB before CERN closes. The lowering of the last two disks will take place mid- and end-of January, respectively. Thus central beampipe installation can be confidently planned to start in February as foreseen, allowing closure of CMS in time for CRA...

  11. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  12. Scheduling mammograms for asymptomatic women

    International Nuclear Information System (INIS)

    Gohagan, J.K.; Darby, W.P.; Spitznagel, E.L.; Tome, A.E.

    1988-01-01

    A decision theoretic model was used to investigate the relative importance of risk level, radiation hazard, mammographic accuracy, and cost in mammographic screening decision. The model uses woman-specific medical and family history facts and clinic-specific information regarding mammographic accuracy and practice to profile both woman and clinic, and to formulate periodic screening recommendations. Model parameters were varied extensively to investigate the sensitivity of screening schedules to input values. Multivariate risk was estimated within the program using published data from the Breast Cancer Detection Demonstration Project 5-year follow-up study. Radiation hazard estimates were developed from published radiation physics and radioepidemiologic risk data. Benchmark values for mammographic sensitivity and specificity under screening conditions were calculated from Breast Cancer Detection Demonstration Project data. Procedural costs used in the analysis were varied around values reflecting conditions at the Washington University Medical Center. Mortality advantages of early versus late breast cancer detection were accounted for using Health Insurance Plan of New York case survival rates. Results are compared with published screening policies to provide insight into implicit assumptions behind those policies. This analysis emphasizes the importance of accounting for variations in clinical accuracy under screening circumstances, in costs, in radiation exposure, and in woman-specific risk when recommending mammographic screening

  13. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Since the lowering of YB0 in February, less spectacular but nonetheless crucial progress has been made along the critical path to CMS completion. The YB0 has been aligned with the beamline to a fraction of a mm, and the HCAL has been fully installed. Cabling scaffolding for YB0 services has been built and one half (-z end) of the ECAL barrel has been installed. The YB0 services installation has begun, with two of the major technical challenges delaying bulk installation, namely PP1 detailed design, manufacture and installation plus Tracker cooling pipe insulation, now apparently solved. Significant difficulties in detailed design, integration and procurement of cable ducts remain. Despite this, the design of the +end is close to complete, and Tracker power cable installation on two sectors of the +end is well advanced. A new master schedule, v36.0, is being prepared to account for the updated actual situation at point 5 and for the revised LHC machine planning. Safety The enormous amount of...

  14. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  15. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  16. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  17. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  18. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  19. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  20. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  1. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  2. Scheduling multimedia services in cloud computing environment

    Science.gov (United States)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  3. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  4. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  5. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  6. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  7. Bridging the Gap Between Planning and Scheduling

    Science.gov (United States)

    Smith, David E.; Frank, Jeremy; Jonsson, Ari K.; Norvig, Peter (Technical Monitor)

    2000-01-01

    Planning research in Artificial Intelligence (AI) has often focused on problems where there are cascading levels of action choice and complex interactions between actions. In contrast. Scheduling research has focused on much larger problems where there is little action choice, but the resulting ordering problem is hard. In this paper, we give an overview of M planning and scheduling techniques, focusing on their similarities, differences, and limitations. We also argue that many difficult practical problems lie somewhere between planning and scheduling, and that neither area has the right set of tools for solving these vexing problems.

  8. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  9. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  10. Quantify Risk to Manage Cost and Schedule

    National Research Council Canada - National Science Library

    Raymond, Fred

    1999-01-01

    Too many projects suffer from unachievable budget and schedule goals, caused by unrealistic estimates and the failure to quantify and communicate the uncertainty of these estimates to managers and sponsoring executives...

  11. Alternative Work Schedules Increase Employee Satisfaction.

    Science.gov (United States)

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  12. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  13. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    . In this paper, we propose a novel nonblocking scheduling mechanism that is used prior to the actual service invocations. Its aim is to reach an agreement between the client and all participating providers on what transaction processing times have to be expected, accepted, and guaranteed. This enables service......For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...... schedulers of service providers typically do take into account neither time constraints for committing the whole transaction, nor the individual services' constraints when scheduling decisions are made. This often leads to an unnecessary blocking of transactions by (possibly long-running) others...

  14. Schedule Sales Query Report Generation System

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  15. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  16. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  17. Congruent Validity of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Harris, Thomas L.; Brown, Nina W.

    1979-01-01

    The validity of the Rathus Assertiveness Schedule (RAS) was investigated by correlating it with the six Class I scales of the California Psychological Inventory on a sample of undergraduate students. Results supported the validity of the RAS. (JKS)

  18. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  19. Job shop scheduling by local search

    NARCIS (Netherlands)

    Aarts, E.H.L.; Lenstra, J.K.; Laarhoven, van P.J.M.; Ulder, N.L.J.

    1992-01-01

    We present a computational performance analysis of local search algorithms for job shop scheduling. The algorithms under investigation are iterative improvement, simulated annealing, threshold accepting and genetic local search. Our study shows that simulated annealing performs best in the sense

  20. Scheduling job shop - A case study

    Science.gov (United States)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  1. Job scheduling in a heterogenous grid environment

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  2. The School Schedule--Servant or Mistress?

    Science.gov (United States)

    Holmes, Mark

    1984-01-01

    Pointing out that time is a dimension of school wealth, the author explores its use in school schedules. Administrators need to be aware of the relationship between time allocation and learning consequences. (MD)

  3. Economic and psychological burden of scheduled surgery ...

    African Journals Online (AJOL)

    Background: Cancellation of scheduled surgery creates a financial burden for hospitals, caregivers and ..... costs and disregard some of the aspects mentioned in the ..... cancellation of elective surgical procedures in a Spanish general.

  4. Onboard Autonomous Scheduling Intelligence System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Scheduling the daily activities of the crew on a human space mission is currently a cumbersome job performed by a large team of operations experts on the ground....

  5. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  6. Courts, Scheduled Damages, and Medical Malpractice Insurance

    DEFF Research Database (Denmark)

    Bertoli, Paola; Grembi, Veronica

    We assess the impact of the introduction of schedules of non-economic damages (i.e. tiered caps systems) on the behavior of insurers operating in the medical liability market for hospitals while controlling the performance of the judicial system, measured as court backlog. Using a difference......-in-differences strategy on Italian data, we find that the introduction of schedules increases the presence of insurers (i.e. medical liability market attractiveness) only in inefficient judicial districts. In the same way, court inefficiency is attractive to insurers for average values of schedules penetration...... of the market, with an increasing positive impact of inefficiency as the territorial coverage of schedules increases. Finally, no significant impact is registered on paid premiums. Our analysis sheds light on a complex set of elements affecting the decisions of insurers in malpractice markets. The analysis...

  7. 76 FR 18262 - January 2011 Pay Schedules

    Science.gov (United States)

    2011-04-01

    ... an OPM memorandum, CPM 2009-27. (See http://www.opm.gov/oca/compmemo/index.asp .) Executive Order... Schedule ($165,300 in 2011, the same level as in 2010). On December 27, 2010, OPM issued a memorandum (CPM...

  8. Heuristic Approach for Balancing Shift Schedules

    International Nuclear Information System (INIS)

    Kim, Dae Ho; Yun, Young Su; Lee, Yong Hee

    2005-01-01

    In this paper, a heuristic approach for balancing shift schedules is proposed. For the shift schedules, various constraints which have usually been considered in realworld industry are used, and the objective is to minimize the differences of the workloads in each workgroup. The constraints and objective function are implemented in the proposed heuristic approach. Using a simple instance, the efficiency of the proposed heuristic approach is proved

  9. Algorithms for classical and modern scheduling problems

    OpenAIRE

    Ott, Sebastian

    2016-01-01

    Subject of this thesis is the design and the analysis of algorithms for scheduling problems. In the first part, we focus on energy-efficient scheduling, where one seeks to minimize the energy needed for processing certain jobs via dynamic adjustments of the processing speed (speed scaling). We consider variations and extensions of the standard model introduced by Yao, Demers, and Shenker in 1995 [79], including the addition of a sleep state, the avoidance of preemption, and variable speed lim...

  10. Maritime wideband communication networks video transmission scheduling

    CERN Document Server

    Yang, Tingting

    2014-01-01

    This Springer Brief covers emerging maritime wideband communication networks and how they facilitate applications such as maritime distress, urgency, safety and general communications. It provides valuable insight on the data transmission scheduling and protocol design for the maritime wideband network. This brief begins with an introduction to maritime wideband communication networks including the architecture, framework, operations and a comprehensive survey on current developments. The second part of the brief presents the resource allocation and scheduling for video packet transmission wit

  11. Lift scheduling organization : Lift Concept for Lemminkainen

    OpenAIRE

    Mingalimov, Iurii

    2015-01-01

    The purpose of the work was to make a simple schedule for the main contractors and clients to check and control workflow connected with lifts. It gathers works with electricity, construction, engineering networks, installing equipment and commissioning works. The schedule was carried out during working on the building site Aino in Saint Petersburg in Lemminkӓinen. The duration of work was 5 months. The lift concept in Lemminkӓinen is very well controlled in comparison with other buil...

  12. Revised data taking schedule with ion beams

    CERN Document Server

    Gazdzicki, Marek; Aduszkiewicz, A; Andrieu, B; Anticic, T; Antoniou, N; Argyriades, J; Asryan, A G; Baatar, B; Blondel, A; Blumer, J; Boldizsar, L; Bravar, A; Brzychczyk, J; Bubak, A; Bunyatov, S A; Choi, K U; Christakoglou, P; Chung, P; Cleymans, J; Derkach, D A; Diakonos, F; Dominik, W; Dumarchez, J; Engel, R; Ereditato, A; Feofilov, G A; Fodor, Z; Ferrero, A; Gazdzicki, M; Golubeva, M; Grebieszkow, K; Grzeszczuk, A; Guber, F; Hasegawa, T; Haungs, A; Igolkin, S; Ivanov, A S; Ivashkin, A; Kadija, K; Katrynska, N; Kielczewska, D; Kikola, D; Kisiel, J; Kobayashi, T; Kolesnikov, V I; Kolev, D; Kolevatov, R S; Kondratiev, V P; Kowalski, S; Kurepin, A; Lacey, R; Laszlo, A; Lyubushkin, V V; Majka, Z; I Malakhov, A; Marchionni, A; Marcinek, A; Maris, I; Matveev, V; Melkumov, G L; Meregaglia, A; Messina, M; Mijakowski, P; Mitrovski, M; Montaruli, T; Mrówczynski, St; Murphy, S; Nakadaira, T; Naumenko, P A; Nikolic, V; Nishikawa, K; Palczewski, T; Pálla, G; Panagiotou, A D; Peryt, W; Planeta, R; Pluta, J; Popov, B A; Posiadala, M; Przewlocki, P; Rauch, W; Ravonel, M; Renfordt, R; Röhrich, D; Rondio, E; Rossi, B; Roth, M; Rubbia, A; Rybczynski, M; Sadovskii, A; Sakashita, K; Schuster, T; Sekiguchi, T; Seyboth, P; Shibata, M; Sissakian, A N; Skrzypczak, E; Slodkowski, M; Sorin, A S; Staszel, P; Stefanek, G; Stepaniak, J; Strabel, C; Ströbele, H; Susa, T; Szentpétery, I; Szuba, M; Tada, M; Taranenko, A; Tsenov, R; Ulrich, R; Unger, M; Vassiliou, M; Vechernin, V V; Vesztergombi, G; Wlodarczyk, Z; Wojtaszek, A; Zipper, W; CERN. Geneva. SPS and PS Experiments Committee; SPSC

    2009-01-01

    This document presents the revised data taking schedule of NA61 with ion beams. The revision takes into account limitations due to the new LHC schedule as well as final results concerning the physics performance with secondary ion beams. It is proposed to take data with primary Ar and Xe beams in 2012 and 2014, respectively, and to test and use for physics a secondary B beam from primary Pb beam fragmentation in 2010, 2011 and 2013.

  13. Job schedul in Grid batch farms

    International Nuclear Information System (INIS)

    Gellrich, Andreas

    2014-01-01

    We present here a study for a scheduler which cooperates with the queueing system TORQUE and is tailored to the needs of a HEP-dominated large Grid site with around 10000 jobs slots. Triggered by severe scaling problems of MAUI, a scheduler, referred to as MYSCHED, was developed and put into operation. We discuss conceptional aspects as well as experiences after almost two years of running.

  14. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  15. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  16. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  17. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  18. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  19. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  20. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  1. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  2. Interoceanic canal excavation scheduling via computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Baldonado, Orlino C [Holmes and Narver, Inc., Los Angeles, CA (United States)

    1970-05-15

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  3. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  4. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors.

    Science.gov (United States)

    Zilanawala, Afshin

    2017-06-01

    Objectives Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9-5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Cohort Study (n = 17,397), to investigate the association between types of maternal nonstandard work (evening, night, away from home overnight, and weekends) and breastfeeding behaviors. Results In unadjusted models, exposure to evening shifts was associated with greater odds of breastfeeding initiation (OR 1.71, CI 1.50-1.94) and greater odds of short (OR 1.55, CI 1.32-1.81), intermediate (OR 2.01, CI 1.64-2.47), prolonged partial duration (OR 2.20, CI 1.78-2.72), and prolonged exclusive duration (OR 1.53, CI 1.29-1.82), compared with mothers who were unemployed and those who work other types of nonstandard shifts. Socioeconomic advantage of mothers working evening schedules largely explained the higher odds of breastfeeding initiation and duration. Conclusions Socioeconomic characteristics explain more breastfeeding behaviors among mothers working evening shifts. Policy interventions to increase breastfeeding initiation and duration should consider the timing of maternal work schedules.

  5. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  6. Step-by-step cyclic processes scheduling

    DEFF Research Database (Denmark)

    Bocewicz, G.; Nielsen, Izabela Ewa; Banaszak, Z.

    2013-01-01

    Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to pro......Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research...... is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS’s material handling and production routes of simultaneously manufactured...... orders, the main objective is to provide the declarative framework aimed at conditions allowing one to calculate the AGVs fleet schedule in online mode. An illustrative example of the relevant algebra-like driven step-by-stem cyclic scheduling is provided....

  7. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  8. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  9. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  10. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  11. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  12. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of... to the advertising of scheduled performance, it is the policy of the Board to regard as an unfair or...

  13. An introduction to optimal satellite range scheduling

    CERN Document Server

    Vázquez Álvarez, Antonio José

    2015-01-01

    The satellite range scheduling (SRS) problem, an important operations research problem in the aerospace industry consisting of allocating tasks among satellites and Earth-bound objects, is examined in this book. SRS principles and solutions are applicable to many areas, including: Satellite communications, where tasks are communication intervals between sets of satellites and ground stations Earth observation, where tasks are observations of spots on the Earth by satellites Sensor scheduling, where tasks are observations of satellites by sensors on the Earth. This self-contained monograph begins with a structured compendium of the problem and moves on to explain the optimal approach to the solution, which includes aspects from graph theory, set theory, game theory and belief networks. This book is accessible to students, professionals and researchers in a variety of fields, including: operations research, optimization, scheduling theory, dynamic programming and game theory. Taking account of the distributed, ...

  14. Optimal Scheduling of Domestic Appliances via MILP

    Directory of Open Access Journals (Sweden)

    Zdenek Bradac

    2014-12-01

    Full Text Available This paper analyzes a consumption scheduling mechanism for domestic appliances within a home area network. The aim of the proposed scheduling is to minimize the total energy price paid by the consumer and to reduce power peaks in order to achieve a balanced daily load schedule. An exact and computationally efficient mixed-integer linear programming (MILP formulation of the problem is presented. This model is verified by several problem instances. Realistic scenarios based on the real price tariffs commercially available in the Czech Republic are calculated. The results obtained by solving the optimization problem are compared with a simulation of the ripple control service currently used by many domestic consumers in the Czech Republic.

  15. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  16. Crane Scheduling for a Plate Storage

    DEFF Research Database (Denmark)

    Hansen, Jesper; Clausen, Jens

    2002-01-01

    Odense Steel Shipyard produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until they are needed in production. This paper considers the problem of scheduling two cranes that carry out the movements of plates...... into, around and out of the storage. The system is required to create a daily schedule for the cranes, but also handle possible disruptions during the execution of the plan. The problem is solved with a Simulated Annealing algorithm....

  17. Autonomous scheduling technology for Earth orbital missions

    Science.gov (United States)

    Srivastava, S.

    1982-01-01

    The development of a dynamic autonomous system (DYASS) of resources for the mission support of near-Earth NASA spacecraft is discussed and the current NASA space data system is described from a functional perspective. The future (late 80's and early 90's) NASA space data system is discussed. The DYASS concept, the autonomous process control, and the NASA space data system are introduced. Scheduling and related disciplines are surveyed. DYASS as a scheduling problem is also discussed. Artificial intelligence and knowledge representation is considered as well as the NUDGE system and the I-Space system.

  18. Scheduling projects with multiskill learning effect.

    Science.gov (United States)

    Zha, Hong; Zhang, Lianying

    2014-01-01

    We investigate the project scheduling problem with multiskill learning effect. A new model is proposed to deal with the problem, where both autonomous and induced learning are considered. In order to obtain the optimal solution, a genetic algorithm with specific encoding and decoding schemes is introduced. A numerical example is used to illustrate the proposed model. The computational results show that the learning effect cannot be neglected in project scheduling. By means of determining the level of induced learning, the project manager can balance the project makespan with total cost.

  19. Anesthesiology Nurse Scheduling using Particle Swarm Optimization

    Directory of Open Access Journals (Sweden)

    Leopoldo Altamirano

    2012-02-01

    Full Text Available In this article we present an approach designed to solve a real world problem: the Anesthesiology Nurse Scheduling Problem (ANSP at a public French hospital. The anesthesiology nurses are one of the most shared resources in the hospital and we attempt to find a fair/balanced schedule for them, taking into account a set of constraints and the nursesarsquo; stated preferences, concerning the different shifts. We propose a particle swarm optimization algorithm to solve the ANSP. Finally, we compare our technique with previous results obtained using integer programming.

  20. Real-time systems scheduling 2 focuses

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc. Scheduling is a central problem for these computing/communication systems since it is responsible for software execution in a timely manner. This book, the second of two volumes on the subject, brings together knowledge on specific topics and discusses the recent advances for some of them.  It addresses foundations as well as the latest advances and findings in real-time scheduling, giving comprehensive references to important papers, but the chapters are short and not overloaded with co

  1. Optimal scheduling of coproduction with a storage

    International Nuclear Information System (INIS)

    Ravn, H.F.; Rygard, J.M.

    1993-02-01

    We consider the problem of optimal scheduling of a system with combined heat and heat (CHP) units and a heat storege. The purpose of the heat storage is to permit a partial decoupling of the variations in the demand for heat and electrical power. We formulate the problem of optimal scheduling as that of minimizing the total costs over the planning period. The heat demand from the district heating system and the ''shadow prices'' for the electrical power system are taken as externally given parameters. The resulting model is solved by dynamic programming. We describe implementation details and we give examples of result of the optimization. (au) (12 refs.)

  2. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  3. Real-time systems scheduling fundamentals

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc.  Scheduling is a central problem for these computing/communication systems since responsible of software execution in a timely manner. This book provides state of knowledge in this domain with special emphasis on the key results obtained within the last decade. This book addresses foundations as well as the latest advances and findings in Real-Time Scheduling, giving all references to important papers. But nevertheless the chapters will be short and not overloaded with confusing details.

  4. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  5. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  6. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  7. Online Scheduling in Distributed Message Converter Systems

    NARCIS (Netherlands)

    Risse, Thomas; Wombacher, Andreas; Surridge, Mike; Taylor, Steve; Aberer, Karl

    The optimal distribution of jobs among hosts in distributed environments is an important factor to achieve high performance. The optimal strategy depends on the application. In this paper we present a new online scheduling strategy for distributed EDI converter system. The strategy is based on the

  8. Crane Scheduling on a Plate Storage

    DEFF Research Database (Denmark)

    Hansen, Jesper

    2002-01-01

    OSS produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until they are needed in production. Two gantry cranes carry out this task. The planning task is now to create a schedule of movements for the 2 cranes...

  9. Improved human performance through appropriate work scheduling

    International Nuclear Information System (INIS)

    Morisseau, D.S.; Lewis, P.M.; Persensky, J.J.

    1987-01-01

    The Nuclear Regulatory Commission (NRC) has had a policy, Generic Letter 82-12, on hours of work since 1982. The policy states that licensees should establish controls to prevent situations where fatigue could reduce the ability of operating personnel to perform their duties safely (USNRC 1982). While that policy does give guidance on hours of work and overtime, it does not address periods of longer than 7 days or work schedules other than the routine 8-hour day, 40-hour week. Recognizing that NRC policy could provide broader guidance for shift schedules and hours of overtime work, the Division of Human Factors Safety conducted a project with Pacific Northwest Laboratories (PNL) to help the NRC better understand the human factors principles and issues concerning hours of work so that the NRC could consider updating their policy as necessary. The results of this project are recommendations for guidelines and limits for periods of 14 days, 28 days, and 1 year to take into account the cumulative effects of fatigue. In addition, routine 12-hour shifts are addressed. This latter type of shift schedule has been widely adopted in the petroleum and chemical industries and several utilities operating nuclear power plants have adopted it as well. Since this is the case, it is important to consider including guidelines for implementing this type of schedule. This paper discusses the bases for the PNL recommendations which are currently being studied by the NRC

  10. ATD-2 Surface Scheduling and Metering Concept

    Science.gov (United States)

    Coppenbarger, Richard A.; Jung, Yoon Chul; Capps, Richard Alan; Engelland, Shawn A.

    2017-01-01

    This presentation describes the concept of ATD-2 tactical surface scheduling and metering. The concept is composed of several elements, including data exchange and integration; surface modeling; surface scheduling; and surface metering. The presentation explains each of the elements. Surface metering is implemented to balance demand and capacity• When surface metering is on, target times from surface scheduler areconverted to advisories for throttling demand• Through the scheduling process, flights with CTOTs will not get addedmetering delay (avoids potential for ‘double delay’)• Carriers can designate certain flights as exempt from metering holds• Demand throttle in Phase 1 at CLT is through advisories sent to rampcontrollers for pushback instructions to the flight deck– Push now– Hold for an advised period of time (in minutes)• Principles of surface metering can be more generally applied to otherairports in the NAS to throttle demand via spot-release times (TMATs Strong focus on optimal use of airport resources• Flexibility enables stakeholders to vary the amount of delay theywould like transferred to gate• Addresses practical aspects of executing surface metering in aturbulent real world environment• Algorithms designed for both short term demand/capacityimbalances (banks) or sustained metering situations• Leverage automation to enable surface metering capability withoutrequiring additional positions• Represents first step in Tactical/Strategic fusion• Provides longer look-ahead calculations to enable analysis ofstrategic surface metering potential usage

  11. Irrigation scheduling using soil moisture sensors

    Science.gov (United States)

    Soil moisture sensors were evaluated and used for irrigation scheduling in humid region. Soil moisture sensors were installed in soil at depths of 15cm, 30cm, and 61cm belowground. Soil volumetric water content was automatically measured by the sensors in a time interval of an hour during the crop g...

  12. Quarterly report on program cost and schedule

    International Nuclear Information System (INIS)

    1989-07-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes project performance data reported through March 1989

  13. Schedule reconciliation tests for management prudency determination

    International Nuclear Information System (INIS)

    Howell, G.E.

    1986-01-01

    The prudency audit of a nuclear project involves engineering, construction, financial, and management dimensions. The audit must retrospectively evaluate the decisions and actions of management decision makers and then equitably allocate the cost impacts of those decisions and actions in a comprehensive and objective manner. In most situations, determination of the impact of schedule delays is a paramount issue. Manzi and Associates uses an approach to schedule reconciliation that focuses on the site-specific, as-built condition. The as-built schedule model is analyzed by a backward pass, or but-for methodology which focuses on the causes and impacts of identified delays. The objective is to demonstrate that but-for the identified delay, the project could have been built in the as-planned time frame. The but-for methodology has been used in many contract dispute cases and is currently being applied to schedule reconciliation on several nuclear plants. The potential for applying this methodology to both new construction and retrofit projects is great

  14. Algorithms for Scheduling and Network Problems

    Science.gov (United States)

    1991-09-01

    time. We already know, by Lemma 2.2.1, that WOPT = O(log( mpU )), so if we could solve this integer program optimally we would be done. However, the...Folydirat, 15:177-191, 1982. [6] I.S. Belov and Ya. N. Stolin. An algorithm in a single path operations scheduling problem. In Mathematical Economics and

  15. Flexible Scheduling in Multimedia Kernels: An Overview

    NARCIS (Netherlands)

    Jansen, P.G.; Scholten, Johan; Laan, Rene; Chow, W.S.

    1999-01-01

    Current Hard Real-Time (HRT) kernels have their timely behaviour guaranteed on the cost of a rather restrictive use of the available resources. This makes current HRT scheduling techniques inadequate for use in a multimedia environment where we can make a considerable profit by a better and more

  16. Maximizing System Lifetime by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.; Bohnenkamp, H.C.; Katoen, Joost P.

    2009-01-01

    The use of mobile devices is limited by the battery lifetime. Some devices have the option to connect an extra battery, or to use smart battery-packs with multiple cells to extend the lifetime. In these cases, scheduling the batteries over the load to exploit recovery properties usually extends the

  17. Cost-efficient scheduling of FAST observations

    Science.gov (United States)

    Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi

    2018-03-01

    A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.

  18. Approximating multi-objective scheduling problems

    NARCIS (Netherlands)

    Dabia, S.; Talbi, El-Ghazali; Woensel, van T.; Kok, de A.G.

    2013-01-01

    In many practical situations, decisions are multi-objective by nature. In this paper, we propose a generic approach to deal with multi-objective scheduling problems (MOSPs). The aim is to determine the set of Pareto solutions that represent the interactions between the different objectives. Due to

  19. Scheduling with time-dependent execution times

    NARCIS (Netherlands)

    Woeginger, G.J.

    1995-01-01

    We consider systems of tasks where the task execution times are time-dependent and where all tasks have some common deadline. We describe how to compute in polynomial time a schedule that minimizes the number of late tasks. This answers a question raised in a recent paper by Ho, Leung and Wei.

  20. FLOWSHOP SCHEDULING USING A NETWORK APPROACH ...

    African Journals Online (AJOL)

    eobe

    time when the last job completes on the last machine. The objective ... more jobs in a permutation flow shop scheduling problem ... processing time of a job on a machine is zero, it ..... hybrid flow shops with sequence dependent setup times ...

  1. Advance Resource Provisioning in Bulk Data Scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Balman, Mehmet

    2012-10-01

    Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

  2. The Growing Diversity of Work Schedules.

    Science.gov (United States)

    Smith, Shirley J.

    1986-01-01

    The author highlights the predominance of the five-day, 40-hour workweek. Although finding little change in recent years in the proportion of workers on 40-hour schedules, Smith notes that there have been some changes in work patterns, with a still small but growing group of workers on "compressed" full-time weeks of less than five days.…

  3. Schedule and status of irradiation experiments

    International Nuclear Information System (INIS)

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-01-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has four irradiation experiments in reactor, and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments

  4. 20 CFR 402.165 - Fee schedule.

    Science.gov (United States)

    2010-04-01

    ... requester for the services rendered. (i) Fee for copies of printed materials. When extra copies of printed... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Fee schedule. 402.165 Section 402.165 Employees' Benefits SOCIAL SECURITY ADMINISTRATION AVAILABILITY OF INFORMATION AND RECORDS TO THE PUBLIC...

  5. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  6. Adaptive resource allocation for efficient patient scheduling

    NARCIS (Netherlands)

    Vermeulen, Ivan B.; Bohte, Sander M.; Elkhuizen, Sylvia G.; Lameris, Han; Bakker, Piet J. M.; La Poutré, Han

    2009-01-01

    Efficient scheduling of patient appointments on expensive resources is a complex and dynamic task. A resource is typically used by several patient groups. To service these groups, resource capacity is often allocated per group, explicitly or implicitly. Importantly, due to fluctuations in demand,

  7. 21 CFR 1308.14 - Schedule IV.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule IV. 1308.14 Section 1308.14 Food and... isomers is possible: (1) Fenfluramine 1670 (e) Stimulants. Unless specifically excepted or unless listed... the following substances having a stimulant effect on the central nervous system, including its salts...

  8. 21 CFR 1308.12 - Schedule II.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule II. 1308.12 Section 1308.12 Food and... 9733 (26) Remifentanil 9739 (27) Sufentanil 9740 (28) Tapentadol 9780 (d) Stimulants. Unless... which contains any quantity of the following substances having a stimulant effect on the central nervous...

  9. 21 CFR 1308.11 - Schedule I.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule I. 1308.11 Section 1308.11 Food and Drugs...) Mecloqualone 2572 (3) Methaqualone 2565 (f) Stimulants. Unless specifically excepted or unless listed in... following substances having a stimulant effect on the central nervous system, including its salts, isomers...

  10. 21 CFR 1308.15 - Schedule V.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule V. 1308.15 Section 1308.15 Food and Drugs... not less than 25 micrograms of atropine sulfate per dosage unit. (d) Stimulants. Unless specifically... which contains any quantity of the following substances having a stimulant effect on the central nervous...

  11. Intelligence amplification framework for enhancing scheduling processes

    NARCIS (Netherlands)

    Dobrkovic, Andrej; Liu, Luyao; Iacob, Maria Eugenia; van Hillegersberg, Jos

    2016-01-01

    The scheduling process in a typical business environment consists of predominantly repetitive tasks that have to be completed in limited time and often containing some form of uncertainty. The intelligence amplification is a symbiotic relationship between a human and an intelligent agent. This

  12. Irrigation scheduling with the neutron probe

    International Nuclear Information System (INIS)

    Travers, P.

    1987-01-01

    The operational theory of the neutron probe is briefly outlined and its application and uses discussed in relation to determination of soil compaction and irrigation scheduling. Graphic examples are given of alluvial soil moisture profiles and how this information can be used to improve trickle irrigation in vineyards. 3 refs., 7 figs

  13. Proportional green time scheduling for traffic lights

    NARCIS (Netherlands)

    P. Kovacs; Le, T. (Tung); R. Núñez Queija (Rudesindo); Vu, H. (Hai); N. Walton

    2016-01-01

    textabstractWe consider the decentralized scheduling of a large number of urban traffic lights. We investigate factors determining system performance, in particular, the length of the traffic light cycle and the proportion of green time allocated to each junction. We study the effect of the length

  14. DEVELOPMENT OF A MAINTENANCE SCHEDULING MODEL FOR ...

    African Journals Online (AJOL)

    ... of minor maintenance, for each machine within this time span. In order to minimize the total cost of repairs and production. A numerical application of this development model in a case study is presented. Key words: Maintenance, modeling, scheduling, optimization. [Global Jnl Engineering Res. Vol.1(2) 2002: 107-118] ...

  15. Cross layer scheduling algorithm for LTE Downlink

    DEFF Research Database (Denmark)

    Popovska Avramova, Andrijana; Yan, Ying; Dittmann, Lars

    2012-01-01

    . This paper evaluates a cross layer scheduling algorithm that aims at minimizing the resource utilization. The algorithm makes decisions regarding the channel conditions and the size of transmission buffers and different QoS demands. The simulation results show that the new algorithm improves the resource...

  16. Scheduling drayage operations in synchromodal transport

    NARCIS (Netherlands)

    Rivera, Arturo E.Pérez; Mes, Martijn R.K.; Bektas, Tolga; Coniglio, Stefano; Martinez-Sykora, Antonio; Voss, Stefan

    2017-01-01

    We study the problem of scheduling drayage operations in synchromodal transport. Besides the usual decisions to time the pick-up and delivery of containers, and to route the vehicles that transport them, synchromodal transport includes the assignment of terminals for empty and loaded containers. The

  17. Simultaneous scheduling of machines and mobile robots

    DEFF Research Database (Denmark)

    Dang, Vinh Quang; Nielsen, Izabela Ewa

    2013-01-01

    This paper deals with the problem of simultaneously scheduling machines and a number of autonomous mobile robots in a flexible manufacturing system (FMS). Besides capability of transporting materials between machines, the considered mobile robots are different from other material handling devices...

  18. Flexible job shop scheduling problem in manufacturing

    OpenAIRE

    Curralo, Ana; Pereira, Ana I.; Barbosa, José; Leitão, Paulo

    2013-01-01

    This paper addresses a real assembly cell: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-Cambrésis, in France. This system can be viewed as a Flexible Job Shop, leading to the formulation of a Flexible Job Shop Scheduling Problem (FJSSP).

  19. Implications of Nontraditional Work Schedules for Women

    Science.gov (United States)

    Polit, Denise F.

    1978-01-01

    Issues, evidence, and arguments relating to the effects of alternative working arrangements on the lives of women are examined. Forms of nontraditional schedules which are analyzed include the shortened work week, flexible working hours, and part-time employment. (Author/GC)

  20. Job shop scheduling by local search

    NARCIS (Netherlands)

    Vaessens, R.J.M.; Aarts, E.H.L.; Lenstra, J.K.

    1994-01-01

    We survey solution methods for the job shop scheduling problem with an emphasis on local search. We discuss both cleterministic and randomized local search methods as well as the applied neighborhoods. We compare the computational performance of the various methods in terms of their effectiveness

  1. Scheduling in Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2015-01-01

    This issue presents five papers selected from the 2013 (4th) International Conference on Engineering, Project, and Production Management (EPPM2013) held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  2. Integrating job scheduling and constrained network routing

    DEFF Research Database (Denmark)

    Gamst, Mette

    2010-01-01

    This paper examines the NP-hard problem of scheduling jobs on resources such that the overall profit of executed jobs is maximized. Job demand must be sent through a constrained network to the resource before execution can begin. The problem has application in grid computing, where a number...

  3. A Comparison of Software Schedule Estimators

    Science.gov (United States)

    1990-09-01

    SLIM ...................................... 33 SPQR /20 ................................... 35 System -4 .................................... 37 Previous...24 3. PRICE-S Outputs ..................................... 26 4. COCOMO Factors by Category ........................... 28 5. SPQR /20 Activities...actual schedules experienced on the projects. The models analyzed were REVIC, PRICE-S, System-4, SPQR /20, and SEER. ix A COMPARISON OF SOFTWARE

  4. LTE uplink scheduling - flow level analysis

    NARCIS (Netherlands)

    Dimitrova, D.C.; van den Berg, J.L.; Heijenk, G.; Litjens, R.; Sacchi, Claudio; Bellalta, Boris; Vinel, Alexey; Schlegel, Christian; Granelli, Fabrizio; Zhang, Yan

    Long Term Evolution (LTE) is a cellular technology foreseen to extend the capacity and improve the performance of current 3G cellular networks. A key mechanism in the LTE traffic handling is the packet scheduler, which is in charge of allocating resources to active flows in both the frequency and

  5. LTE uplink scheduling - Flow level analysis

    NARCIS (Netherlands)

    Dimitrova, D.C.; Berg, J.L. van den; Heijenk, G.; Litjens, R.

    2011-01-01

    Long Term Evolution (LTE) is a cellular technology foreseen to extend the capacity and improve the performance of current 3G cellular networks. A key mechanism in the LTE traffic handling is the packet scheduler, which is in charge of allocating resources to active flows in both the frequency and

  6. 29 CFR 1952.221 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Developmental schedule. 1952.221 Section 1952.221 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Management data system operational July 1, 1973. Automated Management data system operational January 1, 1974...

  7. 29 CFR 1952.211 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual developed by July, 1973; (c) Management Information System, December, 1975; (d) Training in compliance...

  8. 29 CFR 1952.201 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Retraining of present occupational safety and health personnel during March-May 1973; (b... legislation, August 1, 1973; (d) Regulations on variances, August 1973; (e) Management information system...

  9. 29 CFR 1952.341 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Developmental schedule. 1952.341 Section 1952.341 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... State Legislature January 1975 and to become effective by May 1, 1975. (d) Management Information System...

  10. 76 FR 10233 - Schedule of Water Charges

    Science.gov (United States)

    2011-02-24

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 420 Schedule of Water Charges AGENCY: Delaware River..., Part III, Basin Regulations--Water Supply Charges. Accordingly, the Commission's water charging rates..., 2011. Effective Date: February 24, 2011. FOR FURTHER INFORMATION CONTACT: For questions about the water...

  11. Split Scheduling with Uniform Setup Times

    NARCIS (Netherlands)

    Schalekamp, F.; Sitters, R.A.; van der Ster, S.L.; Stougie, L.; Verdugo, V.; van Zuylen, A.

    2015-01-01

    We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a machine cannot process or

  12. Split scheduling with uniform setup times.

    NARCIS (Netherlands)

    F. Schalekamp; R.A. Sitters (René); S.L. van der Ster; L. Stougie (Leen); V. Verdugo; A. van Zuylen

    2015-01-01

    htmlabstractWe study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a

  13. Physician Fee Schedule National Payment Amount File

    Data.gov (United States)

    U.S. Department of Health & Human Services — The significant size of the Physician Fee Schedule Payment Amount File-National requires that database programs (e.g., Access, dBase, FoxPro, etc.) be used to read...

  14. Direct block scheduling technology: Analysis of Avidity

    Directory of Open Access Journals (Sweden)

    Felipe Ribeiro Souza

    Full Text Available Abstract This study is focused on Direct Block Scheduling testing (Direct Multi-Period Scheduling methodology which schedules mine production considering the correct discount factor of each mining block, resulting in the final pit. Each block is analyzed individually in order to define the best target period. This methodology presents an improvement of the classical methodology derived from Lerchs-Grossmann's initial proposition improved by Whittle. This paper presents the differences between these methodologies, specially focused on the algorithms' avidity. Avidity is classically defined by the voracious search algorithms, whereupon some of the most famous greedy algorithms are Branch and Bound, Brutal Force and Randomized. Strategies based on heuristics can accentuate the voracity of the optimizer system. The applied algorithm use simulated annealing combined with Tabu Search. The most avid algorithm can select the most profitable blocks in early periods, leading to higher present value in the first periods of mine operation. The application of discount factors to blocks on the Lerchs-Grossmann's final pit has an accentuated effect with time, and this effect may make blocks scheduled for the end of the mine life unfeasible, representing a trend to a decrease in reported reserves.

  15. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  16. Production planning and scheduling in refinery industry

    International Nuclear Information System (INIS)

    Persson, Jan.

    1999-01-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  17. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-07-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis.

  18. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-06-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  19. Scheduling Broadcasts in a Network of Timelines

    KAUST Repository

    Manzoor, Emaad A.

    2015-05-12

    Broadcasts and timelines are the primary mechanism of information exchange in online social platforms today. Services like Facebook, Twitter and Instagram have enabled ordinary people to reach large audiences spanning cultures and countries, while their massive popularity has created increasingly competitive marketplaces of attention. Timing broadcasts to capture the attention of such geographically diverse audiences has sparked interest from many startups and social marketing gurus. However, formal study is lacking on both the timing and frequency problems. In this thesis, we introduce, motivate and solve the broadcast scheduling problem of specifying the timing and frequency of publishing content to maximise the attention received. We validate and quantify three interacting behavioural phenomena to parametrise social platform users: information overload, bursty circadian rhythms and monotony aversion, which is defined here for the first time. Our analysis of the influence of monotony refutes the common assumption that posts on social network timelines are consumed piecemeal independently. Instead, we reveal that posts are consumed in chunks, which has important consequences for any future work considering human behaviour over social network timelines. Our quantification of monotony aversion is also novel, and has applications to problems in various domains such as recommender list diversification, user satiation and variety-seeking consumer behaviour. Having studied the underlying behavioural phenomena, we link schedules, timelines, attention and behaviour by formalising a timeline information exchange process. Our formulation gives rise to a natural objective function that quantifies the expected collective attention an arrangement of posts on a timeline will receive. We apply this formulation as a case-study on real-data from Twitter, where we estimate behavioural parameters, calculate the attention potential for different scheduling strategies and, using the

  20. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  1. Analysis and Optimisation of Hierarchically Scheduled Multiprocessor Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2008-01-01

    We present an approach to the analysis and optimisation of heterogeneous multiprocessor embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organised in a hierarchy. In this paper, we first develop a holistic scheduling and schedulability analysis that determines the timing properties of a hierarchically scheduled system. Second, we address design problems that are characteristic to such hierarchically scheduled systems: assignment...... of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We also present several algorithms for solving these problems. Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilisation of the system...

  2. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  3. Group Elevator Peak Scheduling Based on Robust Optimization Model

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2013-08-01

    Full Text Available Scheduling of Elevator Group Control System (EGCS is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is realized without getting exact numbers of each calling floor's waiting passengers. Specifically, energy-saving oriented multi-objective scheduling price is proposed, RO uncertain peak scheduling model is built to minimize the price. Because RO uncertain model could not be solved directly, RO uncertain model is transformed to RO certain model by elevator scheduling robust counterparts. Because solution space of elevator scheduling is enormous, to solve RO certain model in short time, ant colony solving algorithm for elevator scheduling is proposed. Based on the algorithm, optimal scheduling solutions are found quickly, and group elevators are scheduled according to the solutions. Simulation results show the method could improve scheduling performances effectively in peak pattern. Group elevators' efficient operation is realized by the RO scheduling method.

  4. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  5. An improved sheep flock heredity algorithm for job shop scheduling and flow shop scheduling problems

    Directory of Open Access Journals (Sweden)

    Chandramouli Anandaraman

    2011-10-01

    Full Text Available Job Shop Scheduling Problem (JSSP and Flow Shop Scheduling Problem (FSSP are strong NP-complete combinatorial optimization problems among class of typical production scheduling problems. An improved Sheep Flock Heredity Algorithm (ISFHA is proposed in this paper to find a schedule of operations that can minimize makespan. In ISFHA, the pairwise mutation operation is replaced by a single point mutation process with a probabilistic property which guarantees the feasibility of the solutions in the local search domain. A Robust-Replace (R-R heuristic is introduced in place of chromosomal crossover to enhance the global search and to improve the convergence. The R-R heuristic is found to enhance the exploring potential of the algorithm and enrich the diversity of neighborhoods. Experimental results reveal the effectiveness of the proposed algorithm, whose optimization performance is markedly superior to that of genetic algorithms and is comparable to the best results reported in the literature.

  6. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    Science.gov (United States)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.

  7. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  8. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  9. Medications for Sleep Schedule Adjustments in Athletes.

    Science.gov (United States)

    Baird, Matthew B; Asif, Irfan M

    Sleep schedule adjustments are common requirements of modern-day athletes. Many nonpharmacologic and pharmacologic strategies exist to facilitate circadian rhythm shifts to maximize alertness and performance during competition. This review summarizes the evidence for commonly used pharmacologic agents and presents recommendations for the sports medicine provider. MEDLINE searches were performed using the following keywords: sleep aids, circadian rhythm adjustment, athletes and sleep, caffeine and sports, melatonin and athletes, and sleep aids and sports. Pertinent articles were extracted and discussed. Clinical review. Level 2. There are very few available studies investigating pharmacologic sleep aids in athletes. Data from studies involving shift workers and airline personnel are more abundant and were used to formulate recommendations and conclusions. Melatonin, caffeine, and nonbenzodiazepine sleep aids have a role in facilitating sleep schedule changes in athletes and maximizing sports performance through sleep enhancement.

  10. Scheduling of resource-constrained projects

    CERN Document Server

    Klein, Robert

    2000-01-01

    Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practiti...

  11. Multiprocessor scheduling for real-time systems

    CERN Document Server

    Baruah, Sanjoy; Buttazzo, Giorgio

    2015-01-01

    This book provides a comprehensive overview of both theoretical and pragmatic aspects of resource-allocation and scheduling in multiprocessor and multicore hard-real-time systems.  The authors derive new, abstract models of real-time tasks that capture accurately the salient features of real application systems that are to be implemented on multiprocessor platforms, and identify rules for mapping application systems onto the most appropriate models.  New run-time multiprocessor scheduling algorithms are presented, which are demonstrably better than those currently used, both in terms of run-time efficiency and tractability of off-line analysis.  Readers will benefit from a new design and analysis framework for multiprocessor real-time systems, which will translate into a significantly enhanced ability to provide formally verified, safety-critical real-time systems at a significantly lower cost.

  12. Software Schedules Missions, Aids Project Management

    Science.gov (United States)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  13. Sensor Transmission Power Schedule for Smart Grids

    Science.gov (United States)

    Gao, C.; Huang, Y. H.; Li, J.; Liu, X. D.

    2017-11-01

    Smart grid has attracted much attention by the requirement of new generation renewable energy. Nowadays, the real-time state estimation, with the help of phasor measurement unit, plays an important role to keep smart grid stable and efficient. However, the limitation of the communication channel is not considered by related work. Considering the familiar limited on-board batteries wireless sensor in smart grid, transmission power schedule is designed in this paper, which minimizes energy consumption with proper EKF filtering performance requirement constrain. Based on the event-triggered estimation theory, the filtering algorithm is also provided to utilize the information contained in the power schedule. Finally, its feasibility and performance is demonstrated using the standard IEEE 39-bus system with phasor measurement units (PMUs).

  14. Preliminary ITER cost and schedule estimates

    International Nuclear Information System (INIS)

    1990-01-01

    The cost, manpower requirements, and schedule estimates for the realization of the ITER tokamak have been studied during the Conceptual Design Activities, as a result of work by the ITER Management Committee. This work was completed during the January-March, 1990 joint work session, and is presented in this report. A possible schedule shows completion of the engineering design phase in 1995, with 180 professionals, at a cost of about $250M. The construction would be completed in 2004 with a rise in professional staff to 300, and a total cost of $4900M. The machine would be operable over an 18-year period, at an annual operating cost averaging $290M. 2 figs

  15. Load scheduling for decentralized CHP plants

    DEFF Research Database (Denmark)

    Nielsen, Henrik Aalborg, orlov 31.07.2008; Madsen, Henrik; Nielsen, Torben Skov

    ) an interactive decision support tool by which optimal schedules can be found given the forecasts or user-defined modifications of the forecasts, and (iii) an automatic on-line system for monitoring when conditions have changed so that rescheduling is appropriate. In this report the focus is on methods applicable...... be obtained. Furthermore, we believe that all relevant forecasting methods are far too complicated to allow for this integration; both uncertainties originating from the dependence of heat load on climate and from meteorological forecasts need to be taken into account. Instead we suggest that the decision....... By letting the system find optimal schedules for each of these realizations the operator can gain some insight into the importance of the uncertainties. It is shown that with modern personal computers (e.g. 1 GHz Pentium III), operating systems (e.g. RedHat Linux 6.0), and compilers (e.g. GNU C 2...

  16. Flexible work schedules, older workers, and retirement.

    Science.gov (United States)

    Siegenthaler, J K; Brenner, A M

    2000-01-01

    Older workers in the United States indicate that they would prefer flexible work arrangements rather than abrupt retirement, yet management has done very little to make this possible. A review of two bodies of literature from the late 1980s is presented: social science writings including sociological, gerontological, and economic literature, and business and management literature. There is a clash between the way jobs are traditionally scheduled and the needs of growing numbers of older workers. Workers continue to be subject to obstacles to phased retirement due to the structuring of health care and pension benefits, downsizing, organizational inflexibility, and "corporate culture." Thus, general views among social scientists regarding the desirability of flexible schedules toward retirement will not produce real changes unless management becomes committed to such changes and they are securely embedded in company policies.

  17. Message Scheduling and Forwarding in Congested DTNs

    KAUST Repository

    Elwhishi, Ahmed; Ho, Pin-Han; Shihada, Basem

    2012-01-01

    Multi-copy utility-based routing has been considered as one of the most applicable approaches to effective message delivery in Delay Tolerant Networks (DTNs). By allowing multiple message replicas launched, the ratio of message delivery or delay can be significantly reduced compared with other counterparts. Such an advantage, nonetheless, is at the expense of taking more buffer space at each node and higher complexity in message forwarding decisions. This paper investigates an efficient message scheduling and dropping policy via analytical modeling approach, aiming to achieve optimal performance in terms of message delivery delay. Extensive simulation results, based on a synthetic mobility model and real mobility traces, show that the proposed scheduling framework can achieve superb performance against its counterparts in terms of delivery delay.

  18. Message Scheduling and Forwarding in Congested DTNs

    KAUST Repository

    Elwhishi, Ahmed

    2012-08-19

    Multi-copy utility-based routing has been considered as one of the most applicable approaches to effective message delivery in Delay Tolerant Networks (DTNs). By allowing multiple message replicas launched, the ratio of message delivery or delay can be significantly reduced compared with other counterparts. Such an advantage, nonetheless, is at the expense of taking more buffer space at each node and higher complexity in message forwarding decisions. This paper investigates an efficient message scheduling and dropping policy via analytical modeling approach, aiming to achieve optimal performance in terms of message delivery delay. Extensive simulation results, based on a synthetic mobility model and real mobility traces, show that the proposed scheduling framework can achieve superb performance against its counterparts in terms of delivery delay.

  19. Responsive versus scheduled feeding for preterm infants

    OpenAIRE

    Watson, Julie; McGuire, William

    2016-01-01

    Version 5\\ud Background\\ud \\ud Feeding preterm infants in response to their hunger and satiation cues (responsive, cue-based, or infant-led feeding) rather than at scheduled intervals might enhance infants' and parents' experience and satisfaction, help in the establishment of independent oral feeding, increase nutrient intake and growth rates, and allow earlier hospital discharge.\\ud \\ud \\ud Objectives\\ud \\ud To assess the effect of a policy of feeding preterm infants on a responsive basis v...

  20. Streaming system scheduling for Xeon Phi

    OpenAIRE

    Faltín, Tomáš

    2017-01-01

    Task scheduling in operating system area is a well-known problem on traditional system architectures (NUMA, SMP). Unfortunately, it does not perform well on emerging many-core architectures, especially on Intel Xeon Phi. We collected all publicly available information about the architecture of Xeon Phi. After that, we benchmarked the Xeon Phi in order to find the missing information about its architecture. We focused especially on the information about cores and memory controllers. These are ...

  1. Prioritizing sleep for healthy work schedules

    OpenAIRE

    Takahashi Masaya

    2012-01-01

    Abstract Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amoun...

  2. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  3. Adapting immunisation schedules for children undergoing chemotherapy.

    Science.gov (United States)

    Fernández-Prada, María; Rodríguez-Martínez, María; García-García, Rebeca; García-Corte, María Dolores; Martínez-Ortega, Carmen

    2018-02-01

    Children undergoing chemotherapy for cancer have special vaccination needs after completion of the treatment. The aim of this study was to evaluate the adaptation of post-chemotherapy vaccination schedules. An observational study was performed on a retrospective cohort that included all children aged from 0 to 14 years, who completed chemotherapy in a tertiary hospital between 2009 and 2015. Inclusion and exclusion criteria were applied. Immunisation was administered in accordance with the guidelines of the Vaccine Advisory Committee of the Spanish Association of Paediatrics. Primary Care immunisation and clinical records of the Preventive Medicine and Public Health Department were reviewed. Of the 99 children who had received chemotherapy, 51 (70.6% males) were included in the study. As regards the type of tumour, 54.9% had a solid organ tumour, and 45.1% had a haematological tumour. Post-chemotherapy immunisation was administered to 70.6%. The most common vaccines received were: diphtheria-tetanus-pertussis or diphtheria-tetanus (54.9%), meningococcus C (41.2%), and seasonal influenza (39.2%). The rate of adaptation of the immunisation schedule after chemotherapy was 9.8%. The pneumococcal conjugate vaccine against 7v or 13v was administered to 21.6% of study subjects. However, only 17.6% received polysaccharide 23v. None received vaccination against hepatitis A. No statistically significant differences were observed between adherence to immunisation schedules and type of tumour (P=.066), gender (P=.304), or age (P=.342). Post-chemotherapy immunisation of children with cancer is poor. The participation of health professionals in training programs and referral of paediatric cancer patients to Vaccine Units could improve the rate of schedule adaptation and proper immunisation of this population. Copyright © 2016 Elsevier España, S.L.U. and Sociedad Española de Enfermedades Infecciosas y Microbiología Clínica. All rights reserved.

  4. A microeconomic scheduler for parallel computers

    Science.gov (United States)

    Stoica, Ion; Abdel-Wahab, Hussein; Pothen, Alex

    1995-01-01

    We describe a scheduler based on the microeconomic paradigm for scheduling on-line a set of parallel jobs in a multiprocessor system. In addition to the classical objectives of increasing the system throughput and reducing the response time, we consider fairness in allocating system resources among the users, and providing the user with control over the relative performances of his jobs. We associate with every user a savings account in which he receives money at a constant rate. When a user wants to run a job, he creates an expense account for that job to which he transfers money from his savings account. The job uses the funds in its expense account to obtain the system resources it needs for execution. The share of the system resources allocated to the user is directly related to the rate at which the user receives money; the rate at which the user transfers money into a job expense account controls the job's performance. We prove that starvation is not possible in our model. Simulation results show that our scheduler improves both system and user performances in comparison with two different variable partitioning policies. It is also shown to be effective in guaranteeing fairness and providing control over the performance of jobs.

  5. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  6. Prioritizing sleep for healthy work schedules

    Science.gov (United States)

    2012-01-01

    Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules. PMID:22738292

  7. Prioritizing sleep for healthy work schedules

    Directory of Open Access Journals (Sweden)

    Takahashi Masaya

    2012-03-01

    Full Text Available Abstract Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work. Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules.

  8. Prioritizing sleep for healthy work schedules.

    Science.gov (United States)

    Takahashi, Masaya

    2012-03-13

    Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules.

  9. Scheduling reinforcement about once a day.

    Science.gov (United States)

    Eckerman, D A

    1999-04-01

    A pigeon earned its daily food by pecking a key according to reinforcement schedules that produced food about once per day. Fixed-interval (FI), Fixed-time (FT), and various complex schedules were arranged to demonstrate the degree to which a scalloped pattern of responding remained. Pausing continued until about an hour before the reinforcer could be earned for FIs of 12, 24, and 48 h. Pausing was not as long for FIs of 18, 19, and 23 h. Pausing of about 24 h was seen for FI 36 h. FT 24 h produced continued responding but at a diminished frequency. The pattern of responding was strongly controlled by the schedule of reinforcement and seemed relatively independent of the cycle of human activity in the surrounding laboratory. Effects of added ratio contingencies and of signaling the availability of reinforcement in FT were also examined. Signaled FTs of 5 min-3 h produced more responding during the signal (autoshaping) than did FTs of 19 or 24 h.

  10. Scheduling Aircraft Landings under Constrained Position Shifting

    Science.gov (United States)

    Balakrishnan, Hamsa; Chandran, Bala

    2006-01-01

    Optimal scheduling of airport runway operations can play an important role in improving the safety and efficiency of the National Airspace System (NAS). Methods that compute the optimal landing sequence and landing times of aircraft must accommodate practical issues that affect the implementation of the schedule. One such practical consideration, known as Constrained Position Shifting (CPS), is the restriction that each aircraft must land within a pre-specified number of positions of its place in the First-Come-First-Served (FCFS) sequence. We consider the problem of scheduling landings of aircraft in a CPS environment in order to maximize runway throughput (minimize the completion time of the landing sequence), subject to operational constraints such as FAA-specified minimum inter-arrival spacing restrictions, precedence relationships among aircraft that arise either from airline preferences or air traffic control procedures that prevent overtaking, and time windows (representing possible control actions) during which each aircraft landing can occur. We present a Dynamic Programming-based approach that scales linearly in the number of aircraft, and describe our computational experience with a prototype implementation on realistic data for Denver International Airport.

  11. New Approaches to Irrigation Scheduling of Vegetables

    Directory of Open Access Journals (Sweden)

    Michael D. Cahn

    2017-04-01

    Full Text Available Using evapotranspiration (ET data for scheduling irrigations on vegetable farms is challenging due to imprecise crop coefficients, time consuming computations, and the need to simultaneously manage many fields. Meanwhile, the adoption of soil moisture monitoring in vegetables has historically been limited by sensor accuracy and cost, as well as labor required for installation, removal, and collection of readings. With recent improvements in sensor technology, public weather-station networks, satellite and aerial imaging, wireless communications, and cloud computing, many of the difficulties in using ET data and soil moisture sensors for irrigation scheduling of vegetables can now be addressed. Web and smartphone applications have been developed that automate many of the calculations involved in ET-based irrigation scheduling. Soil moisture sensor data can be collected through wireless networks and accessed using web browser or smartphone apps. Energy balance methods of crop ET estimation, such as eddy covariance and Bowen ratio, provide research options for further developing and evaluating crop coefficient guidelines of vegetables, while recent advancements in surface renewal instrumentation have led to a relatively low-cost tool for monitoring crop water requirement in commercial farms. Remote sensing of crops using satellite, manned aircraft, and UAV platforms may also provide useful tools for vegetable growers to evaluate crop development, plant stress, water consumption, and irrigation system performance.

  12. Hanford site environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 open-quotes General Environmental Protection Program,close quotes and DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment.close quotes The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations

  13. Automatic Generation of Heuristics for Scheduling

    Science.gov (United States)

    Morris, Robert A.; Bresina, John L.; Rodgers, Stuart M.

    1997-01-01

    This paper presents a technique, called GenH, that automatically generates search heuristics for scheduling problems. The impetus for developing this technique is the growing consensus that heuristics encode advice that is, at best, useful in solving most, or typical, problem instances, and, at worst, useful in solving only a narrowly defined set of instances. In either case, heuristic problem solvers, to be broadly applicable, should have a means of automatically adjusting to the idiosyncrasies of each problem instance. GenH generates a search heuristic for a given problem instance by hill-climbing in the space of possible multi-attribute heuristics, where the evaluation of a candidate heuristic is based on the quality of the solution found under its guidance. We present empirical results obtained by applying GenH to the real world problem of telescope observation scheduling. These results demonstrate that GenH is a simple and effective way of improving the performance of an heuristic scheduler.

  14. Real-time scheduling of software tasks

    International Nuclear Information System (INIS)

    Hoff, L.T.

    1995-01-01

    When designing real-time systems, it is often desirable to schedule execution of software tasks based on the occurrence of events. The events may be clock ticks, interrupts from a hardware device, or software signals from other software tasks. If the nature of the events, is well understood, this scheduling is normally a static part of the system design. If the nature of the events is not completely understood, or is expected to change over time, it may be necessary to provide a mechanism for adjusting the scheduling of the software tasks. RHIC front-end computers (FECs) provide such a mechanism. The goals in designing this mechanism were to be as independent as possible of the underlying operating system, to allow for future expansion of the mechanism to handle new types of events, and to allow easy configuration. Some considerations which steered the design were programming paradigm (object oriented vs. procedural), programming language, and whether events are merely interesting moments in time, or whether they intrinsically have data associated with them. The design also needed to address performance and robustness tradeoffs involving shared task contexts, task priorities, and use of interrupt service routine (ISR) contexts vs. task contexts. This paper will explore these considerations and tradeoffs

  15. Declarative Modeling for Production Order Portfolio Scheduling

    Directory of Open Access Journals (Sweden)

    Banaszak Zbigniew

    2014-12-01

    Full Text Available A declarative framework enabling to determine conditions as well as to develop decision-making software supporting small- and medium-sized enterprises aimed at unique, multi-project-like and mass customized oriented production is discussed. A set of unique production orders grouped into portfolio orders is considered. Operations executed along different production orders share available resources following a mutual exclusion protocol. A unique product or production batch is completed while following a given activity’s network order. The problem concerns scheduling a newly inserted project portfolio subject to constraints imposed by a multi-project environment The answers sought are: Can a given project portfolio specified by its cost and completion time be completed within the assumed time period in a manufacturing system in hand? Which manufacturing system capability guarantees the completion of a given project portfolio ordered under assumed cost and time constraints? The considered problems regard finding a computationally effective approach aimed at simultaneous routing and allocation as well as batching and scheduling of a newly ordered project portfolio subject to constraints imposed by a multi-project environment. The main objective is to provide a declarative model enabling to state a constraint satisfaction problem aimed at multi-project-like and mass customized oriented production scheduling. Multiple illustrative examples are discussed.

  16. Tail-robust scheduling using Limited Processor Sharing.

    NARCIS (Netherlands)

    Nair, J.K.; Wierman, A.; Zwart, A.P.

    2010-01-01

    From a rare events perspective, scheduling disciplines that work well under light (exponential) tailed workload distributions do not perform well under heavy (power) tailed workload distributions, and vice versa, leading to fundamental problems in designing schedulers that are robust to

  17. Analyzing scheduling in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2009-01-01

    Production scheduling has been widely studied in several research areas, resulting in a large number of methods, prescriptions, and approaches. However, the impact on scheduling practice seems relatively low. This is also the case in the food-processing industry, where industry......-specific characteristics induce specific and complex scheduling problems. Based on ideas about decomposition of the scheduling task and the production process, we develop an analysis methodology for scheduling problems in food processing. This combines an analysis of structural (technological) elements of the production...... process with an analysis of the tasks of the scheduler. This helps to understand, describe, and structure scheduling problems in food processing, and forms a basis for improving scheduling and applying methods developed in literature. It also helps in evaluating the organisational structures...

  18. Rabies vaccinations: are abbreviated intradermal schedules the future?

    NARCIS (Netherlands)

    Wieten, R. W.; Leenstra, T.; van Thiel, P. P. A. M.; van Vugt, M.; Stijnis, C.; Goorhuis, A.; Grobusch, M. P.

    2013-01-01

    Rabies is a deadly disease, and current preexposure vaccination schedules are lengthy and expensive. We identified nine studies investigating abbreviated schedules. Although initial responses were lower, accelerated adequate immune responses were elicited after booster vaccinations. Lower-dose (and

  19. Pittsburgh International Airport - March 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  20. Pittsburgh International Airport - April 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  1. Pittsburgh International Airport - January 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  2. Pittsburgh International Airport - February 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  3. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  4. Limited Preemptive Scheduling in Real-time Systems

    OpenAIRE

    Thekkilakattil, Abhilash

    2016-01-01

    Preemptive and non-preemptive scheduling paradigms typically introduce undesirable side effects when scheduling real-time tasks, mainly in the form of preemption overheads and blocking, that potentially compromise timeliness guarantees. The high preemption overheads in preemptive real-time scheduling may imply high resource utilization, often requiring significant over-provisioning, e.g., pessimistic Worst Case Execution Time (WCET) approximations. Non-preemptive scheduling, on the other hand...

  5. Quality-aware scheduling for key-value data stores

    CERN Document Server

    Xu, Chen

    2015-01-01

    This book comprehensively illustrates quality-ware scheduling in key-value stores. In addition, it provides scheduling strategies and a prototype framework of quality-aware scheduler as well as a demonstration of online applications. The book offers a rich blend of theory and practice which is suitable for students, researchers and practitioners interested in distributed systems, NoSQL key-value stores and scheduling.

  6. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  7. User interface issues in supporting human-computer integrated scheduling

    Science.gov (United States)

    Cooper, Lynne P.; Biefeld, Eric W.

    1991-01-01

    The topics are presented in view graph form and include the following: characteristics of Operations Mission Planner (OMP) schedule domain; OMP architecture; definition of a schedule; user interface dimensions; functional distribution; types of users; interpreting user interaction; dynamic overlays; reactive scheduling; and transitioning the interface.

  8. Case mix classification and a benchmark set for surgery scheduling

    NARCIS (Netherlands)

    Leeftink, Gréanne; Hans, Erwin W.

    Numerous benchmark sets exist for combinatorial optimization problems. However, in healthcare scheduling, only a few benchmark sets are known, mainly focused on nurse rostering. One of the most studied topics in the healthcare scheduling literature is surgery scheduling, for which there is no widely

  9. Solving project scheduling problems by minimum cut computations

    NARCIS (Netherlands)

    Möhring, R.H.; Schulz, A.S.; Stork, F.; Uetz, Marc Jochen

    In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in

  10. Optimal Algorithms and a PTAS for Cost-Aware Scheduling

    NARCIS (Netherlands)

    L. Chen; N. Megow; R. Rischke; L. Stougie (Leen); J. Verschae

    2015-01-01

    htmlabstractWe consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling objectives of minimizing the makespan and the

  11. 7 CFR 305.23 - Steam sterilization treatment schedules.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Steam sterilization treatment schedules. 305.23... Steam sterilization treatment schedules. Treatment schedule Temperature( °F) Pressure Exposure period (minutes) Directions T303-b-1 10 lbs 20 Use 28″ vacuum. Steam sterilization is not practical for treatment...

  12. 5 CFR 532.513 - Flexible and compressed work schedules.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Flexible and compressed work schedules... REGULATIONS PREVAILING RATE SYSTEMS Premium Pay and Differentials § 532.513 Flexible and compressed work schedules. Federal Wage System employees who are authorized to work flexible and compressed work schedules...

  13. 33 CFR 401.58 - Pleasure craft scheduling.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pleasure craft scheduling. 401.58... OF TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.58 Pleasure craft scheduling. (a) The transit of pleasure craft shall be scheduled by the traffic controller or the officer in...

  14. Parametric Cost and Schedule Modeling for Early Technology Development

    Science.gov (United States)

    2018-04-02

    Research NoteNational Security Rep rt PARAMETRIC MODELING FOR EARLY TECHNOLOGY DEVELOPMENT COST AND SCHEDULE Chuck...Alexander NSR_11x17_Cover_CostModeling_v8.indd 1 11/20/17 3:15 PM PARAMETRIC COST AND SCHEDULE MODELING FOR EARLY  TECHNOLOGY DEVELOPMENT Chuck...COST AND SCHEDULE MODELING FOR EARLY  TECHNOLOGY DEVELOPMENT iii Contents Figures

  15. Distributing Flexibility to Enhance Robustness in Task Scheduling Problems

    NARCIS (Netherlands)

    Wilmer, D.; Klos, T.B.; Wilson, M.

    2013-01-01

    Temporal scheduling problems occur naturally in many diverse application domains such as manufacturing, transportation, health and education. A scheduling problem arises if we have a set of temporal events (or variables) and some constraints on those events, and we have to find a schedule, which is

  16. A NEW APPROACH TO CLASS SCHEDULING. FINAL REPORT.

    Science.gov (United States)

    CANTER, JOHN; AND OTHERS

    AN INVESTIGATION OF THE USE OF A PROTOTYPE DEVICE FOR CLASS SCHEDULING WAS MADE. THE BEEKLEY INSITE DEVICE THAT WAS STUDIED USES THE "PEEK-A-BOO" PRINCIPLE OF MATCHING COMPUTER TAPES. A TEST GROUP OF 149 GRADUATE STUDENTS WAS USED. THEIR DESIRED SCHEDULES WERE MATCHED AUTOMATICALLY AGAINST A PROPOSED MASTER SCHEDULE TO EVALUATE THE…

  17. 21 CFR 113.83 - Establishing scheduled processes.

    Science.gov (United States)

    2010-04-01

    ... commercial production runs should be determined on the basis of recognized scientific methods to be of a size... CONTAINERS Production and Process Controls § 113.83 Establishing scheduled processes. Scheduled processes for... production shall be adequately provided for in establishing the scheduled process. Critical factors, e.g...

  18. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  19. Alternative Work Schedules in Office and Nonoffice Work Settings.

    Science.gov (United States)

    Kirk, Raymond J.; Barton, H. David

    A rapidly growing change in the workplace is the replacement of a fixed work schedule with a variety of alternative work schedules (AWS), including both flexible and compressed schedules. Experimenting organizations (N=901) evaluated one of four major categories of AWS in office and nonoffice settings, i.e., a flexible 8-hour day;…

  20. 77 FR 33980 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2012-06-08

    ... 1703 Proposed FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice... the Board's proposed FOIA Fee Schedule Update published in the Federal Register of June 1, 2012. The...: The FOIA requires each Federal agency covered by the Act to specify a schedule of fees applicable to...

  1. 76 FR 28194 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2011-05-16

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  2. 75 FR 27228 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2010-05-14

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  3. Some extensions of the discrete lotsizing and scheduling problem

    NARCIS (Netherlands)

    M. Salomon (Marc); L.G. Kroon (Leo); R. Kuik (Roelof); L.N. van Wassenhove (Luk)

    1991-01-01

    textabstractIn this paper the Discrete Lotsizing and Scheduling Problem (DLSP) is considered. DLSP relates to capacitated lotsizing as well as to job scheduling problems and is concerned with determining a feasible production schedule with minimal total costs in a single-stage manufacturing process.

  4. Perceptions of Teachers in South Florida Toward Block Scheduling.

    Science.gov (United States)

    Hamdy, Mona; Urich, Ted

    1998-01-01

    A study was conducted at two metropolitan South Florida high schools to determine perceptions of 100 teachers concerning block scheduling. Teachers felt that the 4 X 4 block schedule contained too many time gaps for teaching foreign languages, English, and math. Teachers believed block schedules benefitted advanced students more than others and…

  5. Optimal Temporal Decoupling in Task Scheduling with Preferences

    NARCIS (Netherlands)

    Endhoven, L.; Klos, T.B.; Witteveen, C.

    2011-01-01

    Multi-agent planning and scheduling concerns finding a joint plan to achieve some set of common goals with several independent agents each aiming to find a plan or schedule for their part of the goals. To avoid conflicts in these individual plans or schedules decoupling is used. Such a decoupling

  6. 29 CFR 2520.103-10 - Annual report financial schedules.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Annual report financial schedules. 2520.103-10 Section 2520... financial schedules. (a) General. The administrator of a plan filing an annual report pursuant to § 2520.103... of the annual report the separate financial schedules described in paragraph (b) of this section. (b...

  7. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicle driving schedules

    International Nuclear Information System (INIS)

    Cardoso, G.; Stadler, M.; Bozchalui, M.C.; Sharma, R.; Marnay, C.; Barbosa-Póvoa, A.; Ferrão, P.

    2014-01-01

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem. - Highlights: • This paper introduces a new EV aggregator model in the DER-CAM model and expands it with a stochastic formulation. • The model is used to analyze the impact of EVs in DER investment decisions in a large office building. • The uncertainty in EV driving patterns is considered through scenarios based on data from a daily commute driving survey. • Results indicate that EVs have a significant impact in optimal DER decisions, particularly when looking at short payback periods. • Furthermore, results indicate that uncertainty in EV driving schedules has little impact on DER investment decisions

  8. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  9. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  10. Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach

    DEFF Research Database (Denmark)

    Hansen, Anders Dohn; Clausen, Jens

    This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning...

  11. Production Planning and Planting Pattern Scheduling Information System for Horticulture

    Science.gov (United States)

    Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu

    2018-02-01

    This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.

  12. Minimizing tardiness for job shop scheduling under uncertainties

    OpenAIRE

    Yahouni , Zakaria; Mebarki , Nasser; Sari , Zaki

    2016-01-01

    International audience; —Many disturbances can occur during the execution of a manufacturing scheduling process. To cope with this drawback , flexible solutions are proposed based on the offline and the online phase of the schedule. Groups of permutable operations is one of the most studied flexible scheduling methods bringing flexibility as well as quality to a schedule. The online phase of this method is based on a human-machine system allowing to choose in real-time one schedule from a set...

  13. Multiple-Machine Scheduling with Learning Effects and Cooperative Games

    Directory of Open Access Journals (Sweden)

    Yiyuan Zhou

    2015-01-01

    Full Text Available Multiple-machine scheduling problems with position-based learning effects are studied in this paper. There is an initial schedule in this scheduling problem. The optimal schedule minimizes the sum of the weighted completion times; the difference between the initial total weighted completion time and the minimal total weighted completion time is the cost savings. A multiple-machine sequencing game is introduced to allocate the cost savings. The game is balanced if the normal processing times of jobs that are on the same machine are equal and an equal number of jobs are scheduled on each machine initially.

  14. Topology-based hierarchical scheduling using deficit round robin

    DEFF Research Database (Denmark)

    Yu, Hao; Yan, Ying; Berger, Michael Stubert

    2009-01-01

    according to the topology. The mapping process could be completed through the network management plane or by manual configuration. Based on the knowledge of the network, the scheduler can manage the traffic on behalf of other less advanced nodes, avoid potential traffic congestion, and provide flow...... protection and isolation. Comparisons between hierarchical scheduling, flow-based scheduling, and class-based scheduling schemes have been carried out under a symmetric tree topology. Results have shown that the hierarchical scheduling scheme provides better flow protection and isolation from attack...

  15. Scheduling of Irrigation and Leaching Requirements

    Directory of Open Access Journals (Sweden)

    Amer Hassan Al-haddad

    2015-03-01

    Full Text Available Iraq depends mainly on Tigris and Euphrates Rivers to provide high percentage of agricultural water use for thousands years. At last years, Iraq is suffering from shortage in water resources due to global climate changes and unfair water politics of the neighboring countries, which affected the future of agriculture plans for irrigation, added to that the lack of developed systems of water management in the irrigation projects and improper allocation of irrigation water, which reduces water use efficiency and lead to losing irrigation water and decreasing in agricultural yield. This study aims at studying the usability of irrigation and leaching scheduling within the irrigating projects and putting a complete annual or seasonal irrigation program as a solution for the scarcity of irrigation water, the increase of irrigation efficiency, lessening the salinity in the projects and preparing an integral irrigation calendar through field measurements of soil physical properties and chemical for project selected and compared to the results of the irrigation scheduling and leaching with what is proposed by the designers. The process is accomplished by using a computer program which was designed by Water Resources Department at the University of Baghdad, with some modification to generalize it and made it applicable to various climatic zone and different soil types. Study area represented by large project located at the Tigris River, and this project was (Al-Amara irrigation project. Sufficient samples of project's soil were collected so as to identify soil physical and chemical properties and the salinity of soil and water as well as identifying the agrarian cycles virtually applied to this project. Finally, a comparison was conducted between the calculated water quantities and the suggested ones by the designers. The research results showed that using this kind of scheduling (previously prepared irrigation and leaching scheduling with its properties

  16. Optimal scheduling using priced timed automata

    DEFF Research Database (Denmark)

    Behrmann, Gerd; Larsen, Kim Guldstrand; Rasmussen, Jacob Illum

    2005-01-01

    This contribution reports on the considerable effort made recently towards extending and applying well-established timed automata technology to optimal scheduling and planning problems. The effort of the authors in this direction has to a large extent been carried out as part of the European...... projects VHS [20] and AMETIST [16] and are available in the recently released UPPAAL CORA [12], a variant of the real-time verification tool UPPAAL [18, 5] specialized for cost-optimal reachability for the extended model of so-called priced timed automata....

  17. Freight railway operator timetabling and engine scheduling

    DEFF Research Database (Denmark)

    Bach, Lukas; Gendreau, M.; Wøhlk, Sanne

    2015-01-01

    In this paper we consider timetable design at a European freight railway operator. The timetable is designed by choosing the time of service for customer unit train demands among a set of discrete points. These discrete points are all found within the a time-window. The objective of the model...... is to minimize cost while adhering to constraints regarding infrastructure usage, demand coverage, and engine availability. The model is solved by a column generation scheme where feasible engine schedules are designed in a label setting algorithm with time-dependent cost and service times....

  18. Designing of vague logic based multilevel feedback queue scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-03-01

    Full Text Available Multilevel feedback queue scheduler suffers from major issues of scheduling such as starvation for long tasks, fixed number of queues, and static length of time quantum in each queue. These factors directly affect the performance of the scheduler. At many times impreciseness exists in attributes of tasks which make the performance even worse. In this paper, our intent is to improve the performance by providing a solution to these issues. We design a multilevel feedback queue scheduler using a vague set which we call as VMLFQ scheduler. VMLFQ scheduler intelligently handles the impreciseness and defines the optimum number of queues as well as the optimal size of time quantum for each queue. It also resolves the problem of starvation. This paper simulates and analyzes the performance of VMLFQ scheduler with the other multilevel feedback queue techniques using MatLab.

  19. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  20. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  1. Robust Optimization for Household Load Scheduling with Uncertain Parameters

    Directory of Open Access Journals (Sweden)

    Jidong Wang

    2018-04-01

    Full Text Available Home energy management systems (HEMS face many challenges of uncertainty, which have a great impact on the scheduling of home appliances. To handle the uncertain parameters in the household load scheduling problem, this paper uses a robust optimization method to rebuild the household load scheduling model for home energy management. The model proposed in this paper can provide the complete robust schedules for customers while considering the disturbance of uncertain parameters. The complete robust schedules can not only guarantee the customers’ comfort constraints but also cooperatively schedule the electric devices for cost minimization and load shifting. Moreover, it is available for customers to obtain multiple schedules through setting different robust levels while considering the trade-off between the comfort and economy.

  2. Developing optimal nurses work schedule using integer programming

    Science.gov (United States)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  3. Scheduling Accessory Assists Patients with Cognitive Disorders

    Science.gov (United States)

    2007-01-01

    Recom Technologies Inc. received initial funding from NASA to research the commercial potential of an artificially intelligent planning reaction model to serve as a tool to help individuals suffering from various forms and levels of brain impairment. In 1993, the chief of the Artificial Intelligence Research Branch at Ames Research Center suggested collaborative research with Santa Clara Valley Medical Center. This partnership led to further development of the technology and funding to support clinical research from the U.S. Department of Education's National Institute on Disability and Rehabilitation Research. In 1996, Attention Control Systems Inc. was founded to market the finished device, called the Planning and Execution Assistant and Trainer (PEAT). PEAT is a pocket-sized PDA-like device with a graphical display, touchscreen controls, an electronic calendar, an address book, and a built-in phone, that cues users to start or stop scheduled activities, monitors their progress, and adjusts schedules as necessary in response to delays or calendar changes. It uses an automatic planning model developed for NASA to adjust daily plans when a situation changes. PEAT is sold as a complete system that includes software, hardware, documentation, and technical support. In addition to the flagship Pocket PEAT device, there is PEAT Phone, PC PEAT, and PEAT Link. Clinical studies of PEAT continue at Santa Clara Valley Medical Center

  4. Runway Scheduling Using Generalized Dynamic Programming

    Science.gov (United States)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  5. Cleaning Schedule Operations in Heat Exchanger Networks

    Directory of Open Access Journals (Sweden)

    Huda Hairul

    2018-01-01

    Full Text Available Heat exchanger networks have been known to be the essential parts in the chemical industries. Unfortunately, since the performance of heat exchanger can be decreasing in transferring the heat from hot stream into cold stream due to fouling, then cleaning the heat exchanger is needed to restore its initial performance periodically. A process of heating crude oil in a refinery plant was used as a case study. As many as eleven heat exchangers were used to heat crude oil before it was heated by a furnace to the temperature required to the crude unit distillation column. The purpose of this study is to determine the cleaning schedule of heat exchanger on the heat exchanger networks due to the decrease of the overall heat transfer coefficient by various percentage of the design value. A close study on the process of heat exchanger cleaning schedule in heat exchanger networks using the method of decreasing overall heat transfer coefficient as target. The result showed that the higher the fouling value the more often the heat exchanger is cleaned because the overall heat transfer coefficient decreases quickly.

  6. Solving University Scheduling Problem Using Hybrid Approach

    Directory of Open Access Journals (Sweden)

    Aftab Ahmed Shaikh

    2011-10-01

    Full Text Available In universities scheduling curriculum activity is an essential job. Primarily, scheduling is a distribution of limited resources under interrelated constraints. The set of hard constraints demand the highest priority and should not to be violated at any cost, while the maximum soft constraints satisfaction mounts the quality scale of solution. In this research paper, a novel bisected approach is introduced that is comprisesd of GA (Genetic Algorithm as well as Backtracking Recursive Search. The employed technique deals with both hard and soft constraints successively. The first phase decisively is focused over elimination of all the hard constraints bounded violations and eventually produces partial solution for subsequent step. The second phase is supposed to draw the best possible solution on the search space. Promising results are obtained by implementation on the real dataset. The key points of the research approach are to get assurance of hard constraints removal from the dataset and minimizing computational time for GA by initializing pre-processed set of chromosomes.

  7. A subjective scheduler for subjective dedicated networks

    Science.gov (United States)

    Suherman; Fakhrizal, Said Reza; Al-Akaidi, Marwan

    2017-09-01

    Multiple access technique is one of important techniques within medium access layer in TCP/IP protocol stack. Each network technology implements the selected access method. Priority can be implemented in those methods to differentiate services. Some internet networks are dedicated for specific purpose. Education browsing or tutorial video accesses are preferred in a library hotspot, while entertainment and sport contents could be subjects of limitation. Current solution may use IP address filter or access list. This paper proposes subjective properties of users or applications are used for priority determination in multiple access techniques. The NS-2 simulator is employed to evaluate the method. A video surveillance network using WiMAX is chosen as the object. Subjective priority is implemented on WiMAX scheduler based on traffic properties. Three different traffic sources from monitoring video: palace, park, and market are evaluated. The proposed subjective scheduler prioritizes palace monitoring video that results better quality, xx dB than the later monitoring spots.

  8. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1999-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations

  9. Optimized Treatment Schedules for Chronic Myeloid Leukemia.

    Directory of Open Access Journals (Sweden)

    Qie He

    2016-10-01

    Full Text Available Over the past decade, several targeted therapies (e.g. imatinib, dasatinib, nilotinib have been developed to treat Chronic Myeloid Leukemia (CML. Despite an initial response to therapy, drug resistance remains a problem for some CML patients. Recent studies have shown that resistance mutations that preexist treatment can be detected in a substantial number of patients, and that this may be associated with eventual treatment failure. One proposed method to extend treatment efficacy is to use a combination of multiple targeted therapies. However, the design of such combination therapies (timing, sequence, etc. remains an open challenge. In this work we mathematically model the dynamics of CML response to combination therapy and analyze the impact of combination treatment schedules on treatment efficacy in patients with preexisting resistance. We then propose an optimization problem to find the best schedule of multiple therapies based on the evolution of CML according to our ordinary differential equation model. This resulting optimization problem is nontrivial due to the presence of ordinary different equation constraints and integer variables. Our model also incorporates drug toxicity constraints by tracking the dynamics of patient neutrophil counts in response to therapy. We determine optimal combination strategies that maximize time until treatment failure on hypothetical patients, using parameters estimated from clinical data in the literature.

  10. Responsive versus scheduled feeding for preterm infants.

    Science.gov (United States)

    Watson, Julie; McGuire, William

    2015-10-13

    Feeding preterm infants in response to their hunger and satiation cues (responsive, cue-based, or infant-led feeding) rather than at scheduled intervals might enhance infants' and parents' experience and satisfaction, help in the establishment of independent oral feeding, increase nutrient intake and growth rates, and allow earlier hospital discharge. To assess the effect of feeding preterm infants on a responsive basis versus feeding prescribed volumes at scheduled intervals on growth, duration of hospital stay, and parental satisfaction. We used the standard search strategy of the Cochrane Neonatal Review Group. This included searches of the Cochrane Central Register of Controlled Trials (CENTRAL, The Cochrane Library, Issue 9, 2015), MEDLINE (1966 to September 2015), EMBASE (1980 to September 2015), and CINAHL (1982 to September 2015), conference proceedings, previous reviews, and trial registries. Randomised controlled trials (RCTs) or quasi-RCTs that compared a policy of feeding preterm infants on a responsive basis versus feeding at scheduled intervals. Two review authors assessed trial eligibility and risk of bias and undertook data extraction independently. We analysed the treatment effects in the individual trials and reported the risk ratio and risk difference for dichotomous data and mean difference (MD) for continuous data, with respective 95% confidence intervals (CIs). We used a fixed-effect model in meta-analyses and explored the potential causes of heterogeneity in sensitivity analyses. We found nine eligible RCTs including 593 infants in total. These trials compared responsive with scheduled interval regimens in preterm infants in the transition phase from intragastric tube to oral feeding. The trials were generally small and contained various methodological weaknesses including lack of blinding and incomplete assessment of all randomised participants. Meta-analyses, although limited by data quality and availability, suggest that responsive feeding

  11. 78 FR 26701 - Schedules of Controlled Substances: Placement of Lorcaserin Into Schedule IV

    Science.gov (United States)

    2013-05-08

    .... Phentermine Being Combined With Lorcaserin Eight commenters expressed concern about the probability that... follows: Several commenters were critical of DEA's handling of the scheduling process. The commenters did..., 1301.74, 1301.75(b) and (c), 1301.76, and 1301.77 on or after June 7, 2013. Labeling and Packaging. All...

  12. Schedules of controlled substances: temporary placement of three synthetic cannabinoids into Schedule I. Final order.

    Science.gov (United States)

    2013-05-16

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule three synthetic cannabinoids under the Controlled Substances Act (CSA) pursuant to the temporary scheduling provisions of 21 U.S.C. 811(h). The substances are (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48). This action is based on a finding by the Deputy Administrator that the placement of these synthetic cannabinoids and their salts, isomers and salts of isomers into Schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the full effect of the CSA and the Controlled Substances Import and Export Act (CSIEA) and their implementing regulations including criminal, civil and administrative penalties, sanctions and regulatory controls of Schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic cannabinoids.

  13. 77 FR 12508 - Schedules of Controlled Substances: Placement of Five Synthetic Cannabinoids Into Schedule I

    Science.gov (United States)

    2012-03-01

    ... constituent of marijuana. ``Synthetic cannabinoids'' are a large family of chemically unrelated structures... that is more common in current usage, ``marijuana.'' The emergence of these five synthetic cannabinoids... cannabinoids with a potential for abuse similar to the Schedule I substances marijuana and THC. These synthetic...

  14. 77 FR 75075 - Schedules of Controlled Substances: Placement of Lorcaserin Into Schedule IV

    Science.gov (United States)

    2012-12-19

    ... marketing lorcaserin as a Schedule IV substance will decrease its abuse, as opposed to marketing it as an... for marketing by FDA as an addition to a reduced-calorie diet and exercise, for chronic weight... to Section 3(d)(1) of Executive Order 12866 and the principles reaffirmed in Executive Order 13563...

  15. Fixed-Time Schedule Effects in Combination with Response-Dependent Schedules

    Science.gov (United States)

    Borrero, John C.; Bartels-Meints, Jamie A.; Sy, Jolene R.; Francisco, Monica T.

    2011-01-01

    We evaluated the effects of fixed-interval (FI), fixed-time (FT), and conjoint (combined) FI FT reinforcement schedules on the responding of 3 adults who had been diagnosed with schizophrenia. Responding on vocational tasks decreased for 2 of 3 participants under FT alone relative to FI alone. Responding under FI FT resulted in response…

  16. Data analysis with the DIANA meta-scheduling approach

    International Nuclear Information System (INIS)

    Anjum, A; McClatchey, R; Willers, I

    2008-01-01

    The concepts, design and evaluation of the Data Intensive and Network Aware (DIANA) meta-scheduling approach for solving the challenges of data analysis being faced by CERN experiments are discussed in this paper. Our results suggest that data analysis can be made robust by employing fault tolerant and decentralized meta-scheduling algorithms supported in our DIANA meta-scheduler. The DIANA meta-scheduler supports data intensive bulk scheduling, is network aware and follows a policy centric meta-scheduling. In this paper, we demonstrate that a decentralized and dynamic meta-scheduling approach is an effective strategy to cope with increasing numbers of users, jobs and datasets. We present 'quality of service' related statistics for physics analysis through the application of a policy centric fair-share scheduling model. The DIANA meta-schedulers create a peer-to-peer hierarchy of schedulers to accomplish resource management that changes with evolving loads and is dynamic and adapts to the volatile nature of the resources

  17. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  18. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  19. Voltage scheduling for low power/energy

    Science.gov (United States)

    Manzak, Ali

    2001-07-01

    Power considerations have become an increasingly dominant factor in the design of both portable and desk-top systems. An effective way to reduce power consumption is to lower the supply voltage since voltage is quadratically related to power. This dissertation considers the problem of lowering the supply voltage at (i) the system level and at (ii) the behavioral level. At the system level, the voltage of the variable voltage processor is dynamically changed with the work load. Processors with limited sized buffers as well as those with very large buffers are considered. Given the task arrival times, deadline times, execution times, periods and switching activities, task scheduling algorithms that minimize energy or peak power are developed for the processors equipped with very large buffers. A relation between the operating voltages of the tasks for minimum energy/power is determined using the Lagrange multiplier method, and an iterative algorithm that utilizes this relation is developed. Experimental results show that the voltage assignment obtained by the proposed algorithm is very close (0.1% error) to that of the optimal energy assignment and the optimal peak power (1% error) assignment. Next, on-line and off-fine minimum energy task scheduling algorithms are developed for processors with limited sized buffers. These algorithms have polynomial time complexity and present optimal (off-line) and close-to-optimal (on-line) solutions. A procedure to calculate the minimum buffer size given information about the size of the task (maximum, minimum), execution time (best case, worst case) and deadlines is also presented. At the behavioral level, resources operating at multiple voltages are used to minimize power while maintaining the throughput. Such a scheme has the advantage of allowing modules on the critical paths to be assigned to the highest voltage levels (thus meeting the required timing constraints) while allowing modules on non-critical paths to be assigned

  20. MOV reliability evaluation and periodic verification scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Bunte, B.D.

    1996-12-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs.

  1. Runway Scheduling for Charlotte Douglas International Airport

    Science.gov (United States)

    Malik, Waqar A.; Lee, Hanbong; Jung, Yoon C.

    2016-01-01

    This paper describes the runway scheduler that was used in the 2014 SARDA human-in-the-loop simulations for CLT. The algorithm considers multiple runways and computes optimal runway times for departures and arrivals. In this paper, we plan to run additional simulation on the standalone MRS algorithm and compare the performance of the algorithm against a FCFS heuristic where aircraft avail of runway slots based on a priority given by their positions in the FCFS sequence. Several traffic scenarios corresponding to current day traffic level and demand profile will be generated. We also plan to examine the effect of increase in traffic level (1.2x and 1.5x) and observe trends in algorithm performance.

  2. Cooperated Bayesian algorithm for distributed scheduling problem

    Institute of Scientific and Technical Information of China (English)

    QIANG Lei; XIAO Tian-yuan

    2006-01-01

    This paper presents a new distributed Bayesian optimization algorithm (BOA) to overcome the efficiency problem when solving NP scheduling problems.The proposed approach integrates BOA into the co-evolutionary schema,which builds up a concurrent computing environment.A new search strategy is also introduced for local optimization process.It integrates the reinforcement learning(RL) mechanism into the BOA search processes,and then uses the mixed probability information from BOA (post-probability) and RL (pre-probability) to enhance the cooperation between different local controllers,which improves the optimization ability of the algorithm.The experiment shows that the new algorithm does better in both optimization (2.2%) and convergence (11.7%),compared with classic BOA.

  3. MOV reliability evaluation and periodic verification scheduling

    International Nuclear Information System (INIS)

    Bunte, B.D.

    1996-01-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs

  4. Estimating demand schedules in hedonic analysis

    DEFF Research Database (Denmark)

    Panduro, Toke Emil; Jensen, Cathrine Ulla; Lundhede, Thomas

    The hedonic pricing method has been used extensively to obtain implicit prices for availability of urban green space, but few hedonic studies have obtained households’ preference parameters. We estimate willingness to pay functions for park availability in Copenhagen using an approach that places...... identifying restrictions on the utility function. We do this for two different measures of park availability. We apply our results to a policy scenario and show how estimates of aggregate welfare changes are highly sensitive to the measure of park availability applied. Thus, the approach in this study applies...... an alternative path for estimation of demand schedules for public goods using hedonic data. The findings also stress the importance of paying attention to how public goods are defined when undertaking welfare economic policy analyses....

  5. Simulation methods for nuclear production scheduling

    International Nuclear Information System (INIS)

    Miles, W.T.; Markel, L.C.

    1975-01-01

    Recent developments and applications of simulation methods for use in nuclear production scheduling and fuel management are reviewed. The unique characteristics of the nuclear fuel cycle as they relate to the overall optimization of a mixed nuclear-fossil system in both the short-and mid-range time frame are described. Emphasis is placed on the various formulations and approaches to the mid-range planning problem, whose objective is the determination of an optimal (least cost) system operation strategy over a multi-year planning horizon. The decomposition of the mid-range problem into power system simulation, reactor core simulation and nuclear fuel management optimization, and system integration models is discussed. Present utility practices, requirements, and research trends are described. 37 references

  6. New plant construction cost and schedule

    International Nuclear Information System (INIS)

    Akins, M. J.

    2009-01-01

    The presentation covers the following topics: cost structure; capital costs; variation of capital costs; trends in power plant construction; studies of costs completion; periods and risks. Nuclear plant costs have recently risen so rapidly that vendors are not willing to publicly commit to cost estimates: ∼ $2000/Kw overnight costs in 2006 in the US market > $4000/Kw and in 2008 in the US market > $6000/Kw in 2008 in emerging markets. There is vendors pricing uncertainty. Current contract models may not apply. Current construction projects have problems: Olkiluoto-3 is reported to be 50% over budget and two years behind schedule, increasing perceptions that nuclear costs will continue to increase rapidly; Price of materials is a big volatile unknown, which may decrease Labor could become more available due to limited number of new projects; Lack of debt/credit to finance new project may decrease demand of new construction

  7. Enhanced OTSG economics optimizing CAPEX + OPEX + Schedule

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, Peter [KTI Engineered to Perform (Canada)

    2011-07-01

    This presentation gives an insight into the economics involved in producing once-through steam (OTSG) generators in Canada and it offers a proposal for improving returns in the industry. The objective of this presentation was to show the importance of developing OTSG manufacturing based on the future of this technology. The growing demand for OTSG by oil companies was presented, suggesting that this is a good time to put effort into developing more efficient designs. After the background of this technology was discussed, several economical aspects of the process were addressed; for instance, reducing capital expenditure (CAPEX) and operation expenditure (OPEX), outsourcing production, and project scheduling and execution. Initiatives proposed included: reducing plot size, producing larger OTSGs, reducing downtime, using alternative fuels, forming a global manufacturing network, and avoiding order blockage. Finally, the idea of designing a portable OTSG was proposed, showing its flexibility in oil extraction projects.

  8. Excellence through outage planning and scheduling

    International Nuclear Information System (INIS)

    Ferriole, G.

    1987-01-01

    The Nuclear and Fossil Generation Division of Electricite de France (EdF) has been the largest nuclear plant operating utility in France since 1984. The size of the units, their standardization, and extensive operating experience were favorable parameters leading to the development of a very complete maintenance organization. Electricite de France believes in the importance of well-defined maintenance concepts. These maintenance concepts contribute to outage performance by requiring a careful consideration of work to be done and by defining the techniques and means of accomplishing this work. In addition to maintenance concepts and careful planning and scheduling, good outage management is achieved through the motivation and dedication of the people involved. It is the key to good operational results

  9. Scheduling home appliances for energy efficient buildings

    DEFF Research Database (Denmark)

    Rossello Busquet, Ana; Kardaras, Georgios; Iversen, Villy Bæk

    2010-01-01

    The number of appliances found in users’ homes is increasing together with electricity consumption of users’ residences. In addition, there is a tendency to consume during the same period leading to demand peaks. During these periods, electricity providers are forced to develop costly methods...... to generate enough power to meet consumers’ requirements. In addition, high demand peaks can lead to electricity shortages or even blackouts in certain areas. In order to avoid demand peaks, users’ appliances should consume electricity in a more distributed way. A new methodology to schedule the usage of home...... appliances is proposed and analyzed. The main concept behind this approach is the aggregation of home appliances into priority classes and the definition of a maximum power consumption threshold, which is not allowed to be exceeded during peak hours. The scenario simulated describes a modern household, where...

  10. Research on logistics scheduling based on PSO

    Science.gov (United States)

    Bao, Huifang; Zhou, Linli; Liu, Lei

    2017-08-01

    With the rapid development of e-commerce based on the network, the logistics distribution support of e-commerce is becoming more and more obvious. The optimization of vehicle distribution routing can improve the economic benefit and realize the scientific of logistics [1]. Therefore, the study of logistics distribution vehicle routing optimization problem is not only of great theoretical significance, but also of considerable value of value. Particle swarm optimization algorithm is a kind of evolutionary algorithm, which is based on the random solution and the optimal solution by iteration, and the quality of the solution is evaluated through fitness. In order to obtain a more ideal logistics scheduling scheme, this paper proposes a logistics model based on particle swarm optimization algorithm.

  11. The Home Care Crew Scheduling Problem

    DEFF Research Database (Denmark)

    Rasmussen, Matias Sevel; Justesen, Tor

    In the Home Care Crew Scheduling Problem (HCCSP) a staff of caretakers has to be assigned a number of visits, such that the total number of assigned visits is maximised. The visits have different locations and positions in time, and travelling time and time windows must be respected. The challenge...... when assigning visits to caretakers lies in the existence of soft constraints and indeed also in temporal dependencies between the starting times of visits. Most former approaches to solving the HCCSP involve the use of heuristic methods. Here we develop an exact branch-and-price algorithm that uses...... clustering of the visits based on the problem structure. The algorithm is tested on real-life problem instances and we obtain solutions that are better than current practice in all cases....

  12. The Home Care Crew Scheduling Problem:

    DEFF Research Database (Denmark)

    Rasmussen, Matias Sevel; Justesen, Tor; Dohn, Anders

    In the Home Care Crew Scheduling Problem a staff of caretakers has to be assigned a number of visits to patients' homes, such that the overall service level is maximised. The problem is a generalisation of the vehicle routing problem with time windows. Required travel time between visits and time...... preference constraints. The algorithm is tested both on real-life problem instances and on generated test instances inspired by realistic settings. The use of the specialised branching scheme on real-life problems is novel. The visit clustering decreases run times significantly, and only gives a loss...... windows of the visits must be respected. The challenge when assigning visits to caretakers lies in the existence of soft preference constraints and in temporal dependencies between the start times of visits. We model the problem as a set partitioning problem with side constraints and develop an exact...

  13. A Gas Scheduling Optimization Model for Steel Enterprises

    Directory of Open Access Journals (Sweden)

    Niu Honghai

    2017-01-01

    Full Text Available Regarding the scheduling problems of steel enterprises, this research designs the gas scheduling optimization model according to the rules and priorities. Considering different features and the process changes of the gas unit in the process of actual production, the calculation model of process state and gas consumption soft measurement together with the rules of scheduling optimization is proposed to provide the dispatchers with real-time gas using status of each process, then help them to timely schedule and reduce the gas volume fluctuations. In the meantime, operation forewarning and alarm functions are provided to avoid the abnormal situation in the scheduling, which has brought about very good application effect in the actual scheduling and ensures the safety of the gas pipe network system and the production stability.

  14. Healthcare Scheduling by Data Mining: Literature Review and Future Directions

    Directory of Open Access Journals (Sweden)

    Maria M. Rinder

    2012-01-01

    Full Text Available This article presents a systematic literature review of the application of industrial engineering methods in healthcare scheduling, with a focus on the role of patient behavior in scheduling. Nine articles that used mathematical programming, data mining, genetic algorithms, and local searches for optimum schedules were obtained from an extensive search of literature. These methods are new approaches to solve the problems in healthcare scheduling. Some are adapted from areas such as manufacturing and transportation. Key findings from these studies include reduced time for scheduling, capability of solving more complex problems, and incorporation of more variables and constraints simultaneously than traditional scheduling methods. However, none of these methods modeled no-show and walk-ins patient behavior. Future research should include more variables related to patient and/or environment.

  15. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  16. The robust schedule - A link to improved workflow

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    -down the contractors, and force them to rigorously adhere to the initial schedule. If delayed the work-pace or manpower has to be increased to observe the schedule. In attempt to improve productivity three independent site-mangers have been interviewed about time-scheduling. Their experiences and opinions have been...... analyzed and weaknesses in existing time scheduling have been found. The findings showed a negative side effect of keeping the schedule to tight. A too tight schedule is inflexible and cannot absorb variability in production. Flexibility is necessary because of the contractors interacting and dependable....... The result is a chaotic, complex and uncontrolled construction site. Furthermore, strict time limits entail the workflow to be optimized under non-optimal conditions. Even though productivity seems to be increasing, productivity per man-hour is decreasing resulting in increased cost. To increase productivity...

  17. ESSOPE: Towards S/C operations with reactive schedule planning

    Science.gov (United States)

    Wheadon, J.

    1993-01-01

    The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.

  18. Designing a fuzzy scheduler for hard real-time systems

    Science.gov (United States)

    Yen, John; Lee, Jonathan; Pfluger, Nathan; Natarajan, Swami

    1992-01-01

    In hard real-time systems, tasks have to be performed not only correctly, but also in a timely fashion. If timing constraints are not met, there might be severe consequences. Task scheduling is the most important problem in designing a hard real-time system, because the scheduling algorithm ensures that tasks meet their deadlines. However, the inherent nature of uncertainty in dynamic hard real-time systems increases the problems inherent in scheduling. In an effort to alleviate these problems, we have developed a fuzzy scheduler to facilitate searching for a feasible schedule. A set of fuzzy rules are proposed to guide the search. The situation we are trying to address is the performance of the system when no feasible solution can be found, and therefore, certain tasks will not be executed. We wish to limit the number of important tasks that are not scheduled.

  19. Distributed Research Project Scheduling Based on Multi-Agent Methods

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta Bodea

    2011-01-01

    Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.

  20. Where do we stand with fuzzy project scheduling?

    CERN Document Server

    Bonnal, Pierre; Lacoste, Germain

    2004-01-01

    Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project- scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.

  1. Price schedules coordination for electricity pool markets

    Science.gov (United States)

    Legbedji, Alexis Motto

    2002-04-01

    We consider the optimal coordination of a class of mathematical programs with equilibrium constraints, which is formally interpreted as a resource-allocation problem. Many decomposition techniques were proposed to circumvent the difficulty of solving large systems with limited computer resources. The considerable improvement in computer architecture has allowed the solution of large-scale problems with increasing speed. Consequently, interest in decomposition techniques has waned. Nonetheless, there is an important class of applications for which decomposition techniques will still be relevant, among others, distributed systems---the Internet, perhaps, being the most conspicuous example---and competitive economic systems. Conceptually, a competitive economic system is a collection of agents that have similar or different objectives while sharing the same system resources. In theory, constructing a large-scale mathematical program and solving it centrally, using currently available computing power can optimize such systems of agents. In practice, however, because agents are self-interested and not willing to reveal some sensitive corporate data, one cannot solve these kinds of coordination problems by simply maximizing the sum of agent's objective functions with respect to their constraints. An iterative price decomposition or Lagrangian dual method is considered best suited because it can operate with limited information. A price-directed strategy, however, can only work successfully when coordinating or equilibrium prices exist, which is not generally the case when a weak duality is unavoidable. Showing when such prices exist and how to compute them is the main subject of this thesis. Among our results, we show that, if the Lagrangian function of a primal program is additively separable, price schedules coordination may be attained. The prices are Lagrange multipliers, and are also the decision variables of a dual program. In addition, we propose a new form of

  2. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  3. Optimal OFDMA Downlink Scheduling Under a Control Signaling Cost Constraint

    OpenAIRE

    Larsson, Erik G.

    2010-01-01

    This paper proposes a new algorithm for downlink scheduling in OFDMA systems. The method maximizes the throughput, taking into account the amount of signaling needed to transmit scheduling maps to the users. A combinatorial problem is formulated and solved via a dynamic programming approach reminiscent of the Viterbi algorithm. The total computational complexity of the algorithm is upper boundedby O(K^4N) where K is the number of users that are being considered for scheduling in a frame and N...

  4. Scheduled feeding results in adipogenesis and increased acylated ghrelin

    OpenAIRE

    Verbaeys, I.; Tolle, V.; SWENNEN, Quirine; Zizzari, P.; Buyse, J.; Epelbaum, J.; Cokelaere, M.

    2011-01-01

    Ghrelin, known to stimulate adipogenesis, displays an endogenous secretory rhythmicity closely related to meal patterns. Therefore, a chronic imposed feeding schedule might induce modified ghrelin levels and consequently adiposity. Growing Wistar rats were schedule-fed by imposing a particular fixed feeding schedule of 3 meals/day without caloric restriction compared with total daily control intake. After 14 days, their body composition was measured by DEXA and compared with ad libitum-fed co...

  5. Flow-shop scheduling problem under uncertainties: Review and trends

    OpenAIRE

    Eliana María González-Neira; Jairo R. Montoya-Torres; David Barrera

    2017-01-01

    Among the different tasks in production logistics, job scheduling is one of the most important at the operational decision-making level to enable organizations to achieve competiveness. Scheduling consists in the allocation of limited resources to activities over time in order to achieve one or more optimization objectives. Flow-shop (FS) scheduling problems encompass the sequencing processes in environments in which the activities or operations are performed in a serial flow. This type of co...

  6. Algorithm comparison for schedule optimization in MR fingerprinting.

    Science.gov (United States)

    Cohen, Ouri; Rosen, Matthew S

    2017-09-01

    In MR Fingerprinting, the flip angles and repetition times are chosen according to a pseudorandom schedule. In previous work, we have shown that maximizing the discrimination between different tissue types by optimizing the acquisition schedule allows reductions in the number of measurements required. The ideal optimization algorithm for this application remains unknown, however. In this work we examine several different optimization algorithms to determine the one best suited for optimizing MR Fingerprinting acquisition schedules. Copyright © 2017 Elsevier Inc. All rights reserved.

  7. The power of reordering for online minimum makespan scheduling

    OpenAIRE

    Englert, Matthias; Özmen, Deniz; Westermann, Matthias

    2014-01-01

    In the classic minimum makespan scheduling problem, we are given an input sequence of jobs with processing times. A scheduling algorithm has to assign the jobs to m parallel machines. The objective is to minimize the makespan, which is the time it takes until all jobs are processed. In this paper, we consider online scheduling algorithms without preemption. However, we do not require that each arriving job has to be assigned immediately to one of the machines. A reordering buffer with limited...

  8. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    1999-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays proposing four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments....

  9. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2004-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays with four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments....

  10. Multiprocessor Real-Time Scheduling with Hierarchical Processor Affinities

    OpenAIRE

    Bonifaci , Vincenzo; Brandenburg , Björn; D'Angelo , Gianlorenzo; Marchetti-Spaccamela , Alberto

    2016-01-01

    International audience; Many multiprocessor real-time operating systems offer the possibility to restrict the migrations of any task to a specified subset of processors by setting affinity masks. A notion of " strong arbitrary processor affinity scheduling " (strong APA scheduling) has been proposed; this notion avoids schedulability losses due to overly simple implementations of processor affinities. Due to potential overheads, strong APA has not been implemented so far in a real-time operat...

  11. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2006-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays proposing four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments...

  12. Optimal Grid Scheduling Using Improved Artificial Bee Colony Algorithm

    OpenAIRE

    T. Vigneswari; M. A. Maluk Mohamed

    2015-01-01

    Job Scheduling plays an important role for efficient utilization of grid resources available across different domains and geographical zones. Scheduling of jobs is challenging and NPcomplete. Evolutionary / Swarm Intelligence algorithms have been extensively used to address the NP problem in grid scheduling. Artificial Bee Colony (ABC) has been proposed for optimization problems based on foraging behaviour of bees. This work proposes a modified ABC algorithm, Cluster Hete...

  13. ALGORITHMIC CONSTRUCTION SCHEDULES IN CONDITIONS OF TIMING CONSTRAINTS

    Directory of Open Access Journals (Sweden)

    Alexey S. Dobrynin

    2014-01-01

    Full Text Available Tasks of time-schedule construction (JSSP in various fields of human activities have an important theoretical and practical significance. The main feature of these tasks is a timing requirement, describing allowed planning time periods and periods of downtime. This article describes implementation variations of the work scheduling algorithm under timing requirements for the tasks of industrial time-schedules construction, and service activities.

  14. Staff Scheduling for Inbound Call and Customer Contact Centers

    OpenAIRE

    Fukunaga, Alex; Hamilton, Ed; Fama, Jason; Andre, David; Matan, Ofer; Nourbakhsh, Illah

    2002-01-01

    The staff scheduling problem is a critical problem in the call center (or, more generally, customer contact center) industry. This article describes DIRECTOR, a staff scheduling system for contact centers. DIRECTOR is a constraint-based system that uses AI search techniques to generate schedules that satisfy and optimize a wide range of constraints and service-quality metrics. DIRECTOR has successfully been deployed at more than 800 contact centers, with significant measurable benefits, some ...

  15. Dynamic Scheduling for Cloud Reliability using Transportation Problem

    OpenAIRE

    P. Balasubramanie; S. K. Senthil Kumar

    2012-01-01

    Problem statement: Cloud is purely a dynamic environment and the existing task scheduling algorithms are mostly static and considered various parameters like time, cost, make span, speed, scalability, throughput, resource utilization, scheduling success rate and so on. Available scheduling algorithms are mostly heuristic in nature and more complex, time consuming and does not consider reliability and availability of the cloud computing environment. Therefore there is a need to implement a sch...

  16. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  17. Using a vision cognitive algorithm to schedule virtual machines

    OpenAIRE

    Zhao Jiaqi; Mhedheb Yousri; Tao Jie; Jrad Foued; Liu Qinghuai; Streit Achim

    2014-01-01

    Scheduling virtual machines is a major research topic for cloud computing, because it directly influences the performance, the operation cost and the quality of services. A large cloud center is normally equipped with several hundred thousand physical machines. The mission of the scheduler is to select the best one to host a virtual machine. This is an NPhard global optimization problem with grand challenges for researchers. This work studies the Virtual Machine (VM) scheduling problem on the...

  18. KASS v.2.2. scheduling software for construction

    OpenAIRE

    Krzemiński Michał

    2016-01-01

    The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System). KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building pr...

  19. Scheduling Additional Train Unit Services on Rail Transit Lines

    OpenAIRE

    Zhibin Jiang; Yuyan Tan; Özgür Yalçınkaya

    2014-01-01

    This paper deals with the problem of scheduling additional train unit (TU) services in a double parallel rail transit line, and a mixed integer programming (MIP) model is formulated for integration strategies of new trains connected by TUs with the objective of obtaining higher frequencies in some special sections and special time periods due to mass passenger volumes. We took timetable scheduling and TUs scheduling as an integrated optimization model with two objectives: minimizing travel ti...

  20. Brief-stimulus presentations on multiform tandem schedules

    OpenAIRE

    Reed, Phil

    1994-01-01

    Three experiments examined the influence of a brief stimulus (a light) on the behavior of food-deprived rats whose lever pressing on tandem schedules comprising components of different schedule types resulted in food presentation. In Experiment 1, either a tandem variable-ratio variable-interval or a tandem variable-interval variable-ratio schedule was used. The variable-interval requirement in the tandem variable-ratio variable-interval schedule was yoked to the time taken to complete the va...

  1. VPipe: Virtual Pipelining for Scheduling of DAG Stream Query Plans

    Science.gov (United States)

    Wang, Song; Gupta, Chetan; Mehta, Abhay

    There are data streams all around us that can be harnessed for tremendous business and personal advantage. For an enterprise-level stream processing system such as CHAOS [1] (Continuous, Heterogeneous Analytic Over Streams), handling of complex query plans with resource constraints is challenging. While several scheduling strategies exist for stream processing, efficient scheduling of complex DAG query plans is still largely unsolved. In this paper, we propose a novel execution scheme for scheduling complex directed acyclic graph (DAG) query plans with meta-data enriched stream tuples. Our solution, called Virtual Pipelined Chain (or VPipe Chain for short), effectively extends the "Chain" pipelining scheduling approach to complex DAG query plans.

  2. APGEN Scheduling: 15 Years of Experience in Planning Automation

    Science.gov (United States)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  3. Heuristic algorithms for scheduling heat-treatment furnaces of steel ...

    Indian Academy of Sciences (India)

    1Department of Management Studies, Indian Institute of Science,. Bangalore .... and scheduling, production monitoring and data capture, and management information. Southall ...... Project Report, Department of Management Studies, Indian.

  4. Toward an Autonomous Telescope Network: the TBT Scheduler

    Science.gov (United States)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  5. Spike: Artificial intelligence scheduling for Hubble space telescope

    Science.gov (United States)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  6. PLAN-IT - Scheduling assistant for solar system exploration

    International Nuclear Information System (INIS)

    Dias, W. C.; Henricks, J. A.; Wong, J. C.; California Institute of Technology, Pasadena)

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered. 13 references

  7. Job shop scheduling problem with late work criterion

    Science.gov (United States)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  8. Evaluation of a twelve-hour/day shift schedule

    International Nuclear Information System (INIS)

    Lewis, P.M.; Swaim, D.J.

    1986-01-01

    In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8-hour to a 12-hour a day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off-the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility

  9. Diverse task scheduling for individualized requirements in cloud manufacturing

    Science.gov (United States)

    Zhou, Longfei; Zhang, Lin; Zhao, Chun; Laili, Yuanjun; Xu, Lida

    2018-03-01

    Cloud manufacturing (CMfg) has emerged as a new manufacturing paradigm that provides ubiquitous, on-demand manufacturing services to customers through network and CMfg platforms. In CMfg system, task scheduling as an important means of finding suitable services for specific manufacturing tasks plays a key role in enhancing the system performance. Customers' requirements in CMfg are highly individualized, which leads to diverse manufacturing tasks in terms of execution flows and users' preferences. We focus on diverse manufacturing tasks and aim to address their scheduling issue in CMfg. First of all, a mathematical model of task scheduling is built based on analysis of the scheduling process in CMfg. To solve this scheduling problem, we propose a scheduling method aiming for diverse tasks, which enables each service demander to obtain desired manufacturing services. The candidate service sets are generated according to subtask directed graphs. An improved genetic algorithm is applied to searching for optimal task scheduling solutions. The effectiveness of the scheduling method proposed is verified by a case study with individualized customers' requirements. The results indicate that the proposed task scheduling method is able to achieve better performance than some usual algorithms such as simulated annealing and pattern search.

  10. PLACEMENT APPLICATIONS SCHEDULING LECTURE IN INTERNATIONAL PROGRAM UNIKOM BASED ANDROID

    Directory of Open Access Journals (Sweden)

    Andri Sahata Sitanggang

    2017-12-01

    Full Text Available One who determines life of a classroom namely mapping scheduling courses especially at college. The process scheduling has included time or schedule of a class of available, room available, lecture who is scheduled for, and schedule for lecturer going to teach. Hopefully with a scheduling it will facilitate the students and teachers in obtaining information lecture schedule. With the emergence of the android application ( is implanted in mobile phones , the public can now use the internet so fast that is based .So with that researchers give one a technology based solutions to build android application .This is because one of the technology has given the functions which may make it easier for students and university lecturers in terms of access to information. In building this application used method of the prototype consisting 2 access namely access user and admin , where module user consisting of modules register , login , scheduling module , while for admin given module login , register and arrangement information scheduling courses both the administration and lecturers .Application made will be integrated with internet so that this program is real-time application.

  11. Scheduled meals and scheduled palatable snacks synchronize circadian rhythms: consequences for ingestive behavior.

    Science.gov (United States)

    Escobar, Carolina; Salgado, Roberto; Rodriguez, Katia; Blancas Vázquez, Aurea Susana; Angeles-Castellanos, Manuel; Buijs, Ruud M

    2011-09-26

    Food is a potent time signal for the circadian system and has shown to entrain and override temporal signals transmitted by the biological clock, the suprachiasmatic nucleus, which adjusts mainly to the daily light/dark (LD) alternation. Organisms mostly ingest food in their active period and this permits a correct coordination between the LD and the food elicited time signals with the circadian system. Under conditions when feeding opportunities are shifted to the usual resting/sleep phase, the potent entraining force of food, shifts circadian fluctuations in several tissues, organs, and brain structures toward meal time, resulting a desynchrony within the body and between the organism and the external LD cycle. The daily scheduled access to a palatable snack exerts similar changes specifically to brain areas involved in motivation and reward responses. This review describes the phenomenology of food entrainment and entrainment by a palatable snack. It suggests how scheduled feeding can lead to food addiction and how shifted feeding schedules toward the sleep phase can result in altered ingestive behavior, obesity and disturbed metabolic responses. Copyright © 2011 Elsevier Inc. All rights reserved.

  12. The application of artificial intelligence to astronomical scheduling problems

    Science.gov (United States)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  13. Request-Driven Schedule Automation for the Deep Space Network

    Science.gov (United States)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol

    2010-01-01

    The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

  14. Concept of Indoor 3D-Route UAV Scheduling System

    DEFF Research Database (Denmark)

    Khosiawan, Yohanes; Nielsen, Izabela Ewa; Do, Ngoc Ang Dung

    2016-01-01

    environment. On top of that, the multi-source productive best-first-search concept also supports efficient real-time scheduling in response to uncertain events. Without human intervention, the proposed work provides an automatic scheduling system for UAV routing problem in 3D indoor environment....

  15. Maternal Nonstandard Work Schedules and Child Cognitive Outcomes

    Science.gov (United States)

    Han, Wen-Jui

    2005-01-01

    This paper examined associations between mothers' work schedules and children's cognitive outcomes in the first 3 years of life for approximately 900 children from the National Institute of Child Health and Human Development Study of Early Child Care. Both the timing and duration of maternal nonstandard work schedules were examined. Although…

  16. 48 CFR 915.404-4-71-5 - Fee schedules.

    Science.gov (United States)

    2010-10-01

    ... METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-4-71-5 Fee schedules. (a... subcontracting, normal contractor services performed by the government or another contractor: (1) The target fee...) The target fee schedule provides for 45 percent of the contract work to be subcontracted for such...

  17. 77 FR 53921 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2012-09-04

    ... after the agency no longer needs them to conduct its business. Some schedules are comprehensive and... records or indicates agency- wide applicability in the case of schedules that cover records that may be..., sustainability reports and plans, and historically significant incident response files. 7. Department of the...

  18. Online scheduling of 2-re-entrant flexible manufacturing systems

    NARCIS (Netherlands)

    Pinxten, J. van; Waqas, U.; Geilen, M.; Basten, T.; Somers, L.

    2017-01-01

    Online scheduling of operations is essential to optimize productivity of flexible manufacturing systems (FMSs) where manufacturing requests arrive on the fly. An FMS processes products according to a particular flow through processing stations. This work focusses on online scheduling of re-entrant

  19. Schedule for Rating Disabilities; the Endocrine System. Final rule.

    Science.gov (United States)

    2017-11-02

    This document amends the Department of Veterans Affairs (VA) Schedule for Rating Disabilities (VASRD) by revising the portion of the Schedule that addresses endocrine conditions and disorders of the endocrine system. The effect of this action is to ensure that the VASRD uses current medical terminology and to provide detailed and updated criteria for evaluation of endocrine disorders.

  20. 5 CFR 532.207 - Time schedule for wage surveys.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Time schedule for wage surveys. 532.207... PREVAILING RATE SYSTEMS Prevailing Rate Determinations § 532.207 Time schedule for wage surveys. (a) Wage... and the collection of wage data by visits to establishments. (c) A wage-change survey shall be made...

  1. Scheduling and Topology Design in Networks with Directional Antennas

    Science.gov (United States)

    2017-05-19

    Scheduling and Topology Design in Networks with Directional Antennas Thomas Stahlbuhk, Nathaniel M. Jones, Brooke Shrader Lincoln Laboratory...controllers must choose which pairs of nodes should communicate in order to establish a topology over which traffic can be sent. Additionally...interacting effects of topology design and transmission scheduling in wireless networks, in particular focusing on networks where nodes are divided into

  2. Hierarchical Scheduling Framework Based on Compositional Analysis Using Uppaal

    DEFF Research Database (Denmark)

    Boudjadar, Jalil; David, Alexandre; Kim, Jin Hyun

    2014-01-01

    This paper introduces a reconfigurable compositional scheduling framework, in which the hierarchical structure, the scheduling policies, the concrete task behavior and the shared resources can all be reconfigured. The behavior of each periodic preemptive task is given as a list of timed actions, ...

  3. 75 FR 48672 - Pesticides; Revised Fee Schedule for Registration Applications

    Science.gov (United States)

    2010-08-11

    ... manufacturers (32551). Wood preservative manufacturers (32519). This listing is not intended to be exhaustive... the Federal Food, Drug, and Cosmetic Act (FFDCA). Section 33 also created a schedule of decision.... For example, instead of the term ``fast-track,'' the schedule in the Congressional Record uses the...

  4. A decentralized scheduling algorithm for time synchronized channel hopping

    Directory of Open Access Journals (Sweden)

    Andrew Tinka

    2011-09-01

    Full Text Available Time Synchronized Channel Hopping (TSCH is an existing Medium Access Control scheme which enables robust communication through channel hopping and high data rates through synchronization. It is based on a time-slotted architecture, and its correct functioning depends on a schedule which is typically computed by a central node. This paper presents, to our knowledge, the first scheduling algorithm for TSCH networks which both is distributed and which copes with mobile nodes. Two variations on scheduling algorithms are presented. Aloha-based scheduling allocates one channel for broadcasting advertisements for new neighbors. Reservation- based scheduling augments Aloha-based scheduling with a dedicated timeslot for targeted advertisements based on gossip information. A mobile ad hoc motorized sensor network with frequent connectivity changes is studied, and the performance of the two proposed algorithms is assessed. This performance analysis uses both simulation results and the results of a field deployment of floating wireless sensors in an estuarial canal environment. Reservation-based scheduling performs significantly better than Aloha-based scheduling, suggesting that the improved network reactivity is worth the increased algorithmic complexity and resource consumption.

  5. 48 CFR 53.301-1439 - Schedule of Accounting Information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Schedule of Accounting Information. 53.301-1439 Section 53.301-1439 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Illustrations of Forms 53.301-1439 Schedule of Accounting...

  6. 48 CFR 49.602-3 - Schedule of accounting information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Schedule of accounting information. 49.602-3 Section 49.602-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... accounting information. Standard Form 1439, Schedule of Accounting Information, shall be filed in support of...

  7. Unit-time scheduling problems with time dependent resources

    NARCIS (Netherlands)

    Tautenhahn, T.; Woeginger, G.

    1997-01-01

    We investigate the computational complexity of scheduling problems, where the operations consume certain amounts of renewable resources which are available in time-dependent quantities. In particular, we consider unit-time open shop problems and unit-time scheduling problems with identical parallel

  8. Improving the performance of sorter systems by scheduling inbound containers

    NARCIS (Netherlands)

    Haneyah, S.W.A.; Schutten, Johannes M.J.; Fikse, K.

    2013-01-01

    This paper addresses the inbound containers scheduling problem for automated sorter systems in two different industrial sectors: parcel & postal sorting and baggage handling. We build on existing literature, particularly on the dynamic load balancing algorithm designed for the parcel hub scheduling

  9. Multi-agent Pareto appointment exchanging in hospital patient scheduling

    NARCIS (Netherlands)

    I.B. Vermeulen (Ivan); S.M. Bohte (Sander); D.J.A. Somefun (Koye); J.A. La Poutré (Han)

    2007-01-01

    htmlabstractWe present a dynamic and distributed approach to the hospital patient scheduling problem, in which patients can have multiple appointments that have to be scheduled to different resources. To efficiently solve this problem we develop a multi-agent Pareto-improvement appointment

  10. Multi-agent Pareto appointment exchanging in hospital patient scheduling

    NARCIS (Netherlands)

    Vermeulen, I.B.; Bohté, S.M.; Somefun, D.J.A.; Poutré, La J.A.

    2007-01-01

    We present a dynamic and distributed approach to the hospital patient scheduling problem, in which patients can have multiple appointments that have to be scheduled to different resources. To efficiently solve this problem we develop a multi-agent Pareto-improvement appointment exchanging algorithm:

  11. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490... Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule. (a) Except as provided in section 490.304 of this part, of the light duty motor vehicles newly acquired by a...

  12. Integrated scheduled waste management system in Kuala Lumpur ...

    African Journals Online (AJOL)

    GREGORY

    2011-12-16

    Dec 16, 2011 ... Over the past decade, Malaysia has enjoyed tremendous growth in its economy. This has brought about a population growth together with a great influx of foreign workforce to the cities. This resulted in an increase in the amount of scheduled waste generated. Furthermore, scheduled waste management ...

  13. 18 CFR 420.41 - Schedule of water charges.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Schedule of water charges. 420.41 Section 420.41 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Charges; Exemptions § 420.41 Schedule of water...

  14. Cyclic machine scheduling with tool transportation - additional calculations

    NARCIS (Netherlands)

    Kuijpers, C.M.H.

    2001-01-01

    In the PhD Thesis of Kuijpers a cyclic machine scheduling problem with tool transportation is considered. For the problem with two machines, it is shown that there always exists an optimal schedule with a certain structure. This is done by means of an elaborate case study. For a number of cases some

  15. The Liner Shipping Routing and Scheduling Problem Under Environmental Considerations

    DEFF Research Database (Denmark)

    Dithmer, Philip; Reinhardt, Line Blander; Kontovas, Christos

    2017-01-01

    This paper deals with the Liner Shipping Routing and Scheduling Problem (LSRSP), which consists of designing the time schedule for a vessel to visit a fixed set of ports while minimizing costs. We extend the classical problem to include the external cost of ship air emissions and we present some...

  16. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  17. Guidelines for successful self-scheduling on nursing units.

    Science.gov (United States)

    Russell, Elizabeth; Hawkins, Jenna; Arnold, Kara A

    2012-09-01

    Self-scheduling programs are an increasingly popular strategy utilized by employers to address the individual and organizational challenges resulting from employee work-life imbalance among the nursing workforce. Certain key components will ensure buy-in and support from staff when self-scheduling programs are developed.

  18. Using Integer Programming for Airport Service Planning in Staff Scheduling

    Directory of Open Access Journals (Sweden)

    W.H. Ip

    2010-09-01

    Full Text Available Reliability and safety in flight is extremely necessary and that depend on the adoption of proper maintenance system. Therefore, it is essential for aircraft maintenance companies to perform the manpower scheduling efficiently. One of the objectives of this paper is to provide an Integer Programming approach to determine the optimal solutions to aircraft maintenance planning and scheduling and hence the planning and scheduling processes can become more efficient and effective. Another objective is to develop a set of computational schedules for maintenance manpower to cover all scheduled flights. In this paper, a sequential methodology consisting of 3 stages is proposed. They are initial maintenance demand schedule, the maintenance pairing and the maintenance group(s assignment. Since scheduling would split up into different stages, different mathematical techniques have been adopted to cater for their own problem characteristics. Microsoft Excel would be used. Results from the first stage and second stage would be inputted into integer programming model using Microsoft Excel Solver to find the optimal solution. Also, Microsoft Excel VBA is used for devising a scheduling system in order to reduce the manual process and provide a user friendly interface. For the results, all can be obtained optimal solution and the computation time is reasonable and acceptable. Besides, the comparison of the peak time and non-peak time is discussed.

  19. Finding Worst-Case Flexible Schedules using Coevolution

    DEFF Research Database (Denmark)

    Jensen, Mikkel Thomas

    2001-01-01

    Finding flexible schedules is important to industry, since in many environments changes such as machine breakdowns or the appearance of new jobs can happen at short notice.......Finding flexible schedules is important to industry, since in many environments changes such as machine breakdowns or the appearance of new jobs can happen at short notice....

  20. Fixed Schedules Can Support 21st-Century Skills

    Science.gov (United States)

    Formanack, Gail; Pietsch, Laura

    2011-01-01

    The common belief among school librarians is that a flexibly scheduled school library program as opposed to a fixed schedule program is the best choice. After all, there are distinct advantages to the flexible program: students are served at the point of need, skills are not taught in isolation, and collaborative lessons are developed with…

  1. On program restructuring, scheduling, and communication for parallel processor systems

    Energy Technology Data Exchange (ETDEWEB)

    Polychronopoulos, Constantine D. [Univ. of Illinois, Urbana, IL (United States)

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, these algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented.

  2. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH

    Directory of Open Access Journals (Sweden)

    Sukho Oh

    2018-04-01

    Full Text Available Time Slotted Channel Hopping (TSCH is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  3. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH.

    Science.gov (United States)

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-04-16

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  4. Nonstandard Work Schedules and Partnership Quality: Quantitative and Qualitative Findings

    Science.gov (United States)

    Mills, Melinda; Taht, Kadri

    2010-01-01

    This article questions existing findings and provides new evidence about the consequences of nonstandard work schedules on partnership quality. Using quantitative couple data from The Netherlands Kinship Panel Study (NKPS) (N = 3,016) and semistructured qualitative interviews (N = 34), we found that, for women, schedules with varying hours…

  5. Scheduling and Communication Synthesis for Distributed Real-Time Systems

    DEFF Research Database (Denmark)

    Pop, Paul

    2000-01-01

    on aspects of scheduling and communication for embedded real-time systems. Special emphasis has been placed on the impact of the communication infrastructure and protocol on the overall system performance. The scheduling and communication strategies proposed are based on an abstract graph representation...

  6. Linearly Ordered Attribute Grammar Scheduling Using SAT-Solving

    NARCIS (Netherlands)

    Bransen, Jeroen; van Binsbergen, L.Thomas; Claessen, Koen; Dijkstra, Atze

    2015-01-01

    Many computations over trees can be specified using attribute grammars. Compilers for attribute grammars need to find an evaluation order (or schedule) in order to generate efficient code. For the class of linearly ordered attribute grammars such a schedule can be found statically, but this problem

  7. Block Scheduling: Restructuring the School Day. Hot Topics Series.

    Science.gov (United States)

    Flinders, David J., Ed.

    The advantages and disadvantages of block scheduling are considered in 24 articles. The editors provide an overview for each section and a conclusion for the anthology. The first section includes articles which examine issues, concepts, and cases: (1) "All around the Block" (Michael D. Rettig and Robert Lynn Canady); (2) "Block Scheduling: A Means…

  8. 36 CFR 1258.12 - NARA reproduction fee schedule.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false NARA reproduction fee... ADMINISTRATION PUBLIC AVAILABILITY AND USE FEES § 1258.12 NARA reproduction fee schedule. (a) Certification: $15...) Unlisted processes: For reproductions not covered by this fee schedule, see also § 1258.4. Fees for other...

  9. 41 CFR 51-9.304-5 - Reproduction fee schedule.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Reproduction fee schedule... RULES 9.3-Individual Access to Records § 51-9.304-5 Reproduction fee schedule. (a) The fee for... physical characteristics do not permit reproduction by routine electrostatic copying shall be the direct...

  10. 12 CFR 404.9 - Schedule of fees.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Schedule of fees. 404.9 Section 404.9 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES INFORMATION DISCLOSURE Procedures for Disclosure of Records Under the Freedom of Information Act. § 404.9 Schedule of fees. (a) General. Ex-Im Bank shall...

  11. Duality-based algorithms for scheduling on unrelated parallel machines

    NARCIS (Netherlands)

    van de Velde, S.L.; van de Velde, S.L.

    1993-01-01

    We consider the following parallel machine scheduling problem. Each of n independent jobs has to be scheduled on one of m unrelated parallel machines. The processing of job J[sub l] on machine Mi requires an uninterrupted period of positive length p[sub lj]. The objective is to find an assignment of

  12. 45 CFR 2106.7 - Schedule of fees.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Schedule of fees. 2106.7 Section 2106.7 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION OF FINE ARTS RULES FOR COMPLIANCE WITH 5 U.S.C. 552a, THE PRIVACY ACT OF 1974 § 2106.7 Schedule of fees. No fees will be charged for...

  13. 50 CFR 260.70 - Schedule of fees.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Schedule of fees. 260.70 Section 260.70... Products for Human Consumption Fees and Charges § 260.70 Schedule of fees. (a) Unless otherwise provided in a written agreement between the applicant and the Secretary, the fees to be charged and collected...

  14. 77 FR 32433 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2012-06-01

    ... 1703 Proposed FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice... Defense Nuclear Facilities Safety Board is publishing its proposed Freedom of Information Act (FOIA) Fee.... on or before July 2, 2012. ADDRESSES: Comments on the proposed fee schedule should be mailed or...

  15. How do employees prioritise when they schedule their own shifts?

    Science.gov (United States)

    Nabe-Nielsen, Kirsten; Lund, Henrik; Ajslev, Jeppe Z; Hansen, Åse Marie; Albertsen, Karen; Hvid, Helge; Garde, Anne Helene

    2013-01-01

    We investigated how employees prioritised when they scheduled their own shifts and whether priorities depended on age, gender, educational level, cohabitation and health status. We used cross-sectional questionnaire data from the follow-up survey of an intervention study investigating the effect of self-scheduling (n = 317). Intervention group participants were asked about their priorities when scheduling their own shifts succeeded by 17 items covering family/private life, economy, job content, health and sleep. At least half of the participants reported that they were giving high priority to their family life, having consecutive time off, leisure-time activities, rest between shifts, sleep, regularity of their everyday life, health and that the work schedule balanced. Thus, employees consider both their own and the workplace's needs when they have the opportunity to schedule their own shifts. Age, gender, cohabitation and health status were all significantly associated with at least one of these priorities. Intervention studies report limited health effects of self-scheduling. Therefore, we investigated to what extent employees prioritise their health and recuperation when scheduling their own shifts. We found that employees not only consider both their health and family but also the workplace's needs when they schedule their own shifts.

  16. Recovery scheduling for industrial pocesses using graph constraints

    NARCIS (Netherlands)

    Saltik, M.B.; van Gameren, S.; Özkan, L.; Weiland, S.

    2017-01-01

    This paper considers a class of scheduling problems cast for processes that consist of several interconnected subprocesses. We model the temporal constraints (On-Off status) on each subprocess using labeled directed graphs to form the admissible set of schedules. Furthermore, we consider physical

  17. 5 CFR 9901.212 - Pay schedules and pay bands.

    Science.gov (United States)

    2010-01-01

    ... Section 9901.212 Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL... Secretary may establish one or more pay schedules within each career group. (b) Each pay schedule may...

  18. Throughput maximization of parcel sorter systems by scheduling inbound containers

    NARCIS (Netherlands)

    Haneyah, S.W.A.; Schutten, Johannes M.J.; Fikse, K.; Clausen, Uwe; ten Hompel, Michael; Meier, J. Fabian

    2013-01-01

    This paper addresses the inbound container scheduling problem for automated sorter systems in express parcel sorting. The purpose is to analyze which container scheduling approaches maximize the throughput of sorter systems. We build on existing literature, particularly on the dynamic load balancing

  19. Solving a chemical batch scheduling problem by local search

    NARCIS (Netherlands)

    Brucker, P.; Hurink, Johann L.

    1999-01-01

    A chemical batch scheduling problem is modelled in two different ways as a discrete optimization problem. Both models are used to solve the batch scheduling problem in a two-phase tabu search procedure. The method is tested on real-world data.

  20. Agent-based transportation planning compared with scheduling heuristics

    NARCIS (Netherlands)

    Mes, Martijn R.K.; van der Heijden, Matthijs C.; van Harten, Aart

    2004-01-01

    Here we consider the problem of dynamically assigning vehicles to transportation orders that have di¤erent time windows and should be handled in real time. We introduce a new agent-based system for the planning and scheduling of these transportation networks. Intelligent vehicle agents schedule