WorldWideScience

Sample records for scheduling information visit

  1. Schedules for home visits in the early postpartum period.

    Science.gov (United States)

    Yonemoto, Naohiro; Dowswell, Therese; Nagai, Shuko; Mori, Rintaro

    2017-08-02

    Maternal complications including psychological and mental health problems and neonatal morbidity have been commonly observed in the postpartum period. Home visits by health professionals or lay supporters in the weeks following the birth may prevent health problems from becoming chronic with long-term effects on women, their babies, and their families. To assess outcomes for women and babies of different home-visiting schedules during the early postpartum period. The review focuses on the frequency of home visits, the duration (when visits ended) and intensity, and on different types of home-visiting interventions. We searched the Cochrane Pregnancy and Childbirth Group's Trials Register (28 January 2013) and reference lists of retrieved articles. Randomised controlled trials (RCTs) (including cluster-RCTs) comparing different types of home-visiting interventions enrolling participants in the early postpartum period (up to 42 days after birth). We excluded studies in which women were enrolled and received an intervention during the antenatal period (even if the intervention continued into the postnatal period) and studies recruiting only women from specific high-risk groups. (e.g. women with alcohol or drug problems). Study eligibility was assessed by at least two review authors. Data extraction and assessment of risk of bias were carried out independently by at least two review authors. Data were entered into Review Manager software. We included data from 12 randomised trials with data for more than 11,000 women. The trials were carried out in countries across the world, and in both high- and low-resource settings. In low-resource settings women receiving usual care may have received no additional postnatal care after early hospital discharge.The interventions and control conditions varied considerably across studies with trials focusing on three broad types of comparisons: schedules involving more versus fewer postnatal home visits (five studies), schedules

  2. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  3. Treating Non-Retentive Encopresis with Rewarded Scheduled Toilet Visits

    Science.gov (United States)

    Boles, Richard E; Roberts, Michael C; Vernberg, Eric M

    2008-01-01

    We evaluated the effects of rewarded scheduled toilet sits on non-retentive encopretic behavior of an elementary-school student receiving services for serious emotional disturbance. A multidisciplinary team implemented the 8-week intervention using a multiple baseline across settings design. The results showed an increase in sitting on the toilet and a decline in encopretic episodes in both school and home settings. These findings support the use of a behavioral intervention for children with significant behavioral disorders within a classroom setting. PMID:22477690

  4. The Home Care Crew Scheduling Problem: Preference-based visit clustering and temporal dependencies

    DEFF Research Database (Denmark)

    Rasmussen, Matias Sevel; Justesen, Tor Fog; Dohn, Anders Høeg

    2012-01-01

    In the Home Care Crew Scheduling Problem a staff of home carers has to be assigned a number of visits to patients’ homes, such that the overall service level is maximised. The problem is a generalisation of the vehicle routing problem with time windows. Required travel time between visits and time...... preference constraints. The algorithm is tested both on real-life problem instances and on generated test instances inspired by realistic settings. The use of the specialised branching scheme on real-life problems is novel. The visit clustering decreases run times significantly, and only gives a loss...... windows of the visits must be respected. The challenge when assigning visits to home carers lies in the existence of soft preference constraints and in temporal dependencies between the start times of visits.We model the problem as a set partitioning problem with side constraints and develop an exact...

  5. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  6. Consumer Health Information and the Demand for Physician Visits.

    Science.gov (United States)

    Schmid, Christian

    2015-12-01

    The present study empirically investigates the effect of consumer health information on the demand for physician visits. Using a direct information measure based on questions from the Swiss Health Survey, we estimate a Poisson hurdle model for office visits. We find that information has a negative effect on health care utilization, contradicting previous findings in the literature. We consider differences in the used information measures to be the most likely explanation for the different findings. However, our results suggest that increasing consumer health information has the potential to reduce health care expenditures. Copyright © 2014 John Wiley & Sons, Ltd.

  7. Measuring adequacy of prenatal care: does missing visit information matter?

    Science.gov (United States)

    Kurtzman, Jordan H; Wasserman, Erin B; Suter, Barbara J; Glantz, J Christopher; Dozier, Ann M

    2014-09-01

    Kotelchuck's Adequacy of Prenatal Care Utilization (APNCU) Index is frequently used to classify levels of prenatal care. In the Finger Lakes Region (FLR) of upstate New York, prenatal care visit information late in pregnancy is often not documented on the birth certificate. We studied the extent of this missing information and its impact on the validity of regional APNCU scores. We calculated the "weeks between" a mother's last prenatal care visit and her infant's date of birth. We adjusted the APNCU algorithm creating the Last Visit Adequacy of Prenatal Care (LV-APNC) Index using the last recorded prenatal care visit date as the end point of care and the expected number of visits at that time. We compared maternal characteristics by care level with each index, examining rates of reclassification and number of "weeks between" by birth hospital. Stuart-Maxwell, McNemar, chi-square, and t-tests were used to determine statistical significance. Based on 58,462 births, the mean "weeks between" was 2.8 weeks. Compared with their APNCU Index score, 42.4 percent of mothers were reclassified using the LV-APNC Index. Major movement occurred from Intermediate (APNCU) to Adequate or Adequate Plus (LV-APNC) leaving the Intermediate Care group a more at-risk group of mothers. Those with Adequate or Adequate Plus Care (LV-APNC) increased by 31.6 percent, surpassing the Healthy People 2020 objective. In the FLR, missing visit information at the end of pregnancy results in an underestimation of mothers' prenatal care. Future research is needed to determine the extent of this missing visit information on the national level. © 2014 Wiley Periodicals, Inc.

  8. 48 CFR 49.602-3 - Schedule of accounting information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Schedule of accounting information. 49.602-3 Section 49.602-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... accounting information. Standard Form 1439, Schedule of Accounting Information, shall be filed in support of...

  9. Production Planning and Planting Pattern Scheduling Information System for Horticulture

    Science.gov (United States)

    Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu

    2018-02-01

    This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.

  10. 48 CFR 53.301-1439 - Schedule of Accounting Information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Schedule of Accounting Information. 53.301-1439 Section 53.301-1439 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Illustrations of Forms 53.301-1439 Schedule of Accounting...

  11. Improved Scheduling Mechanisms for Synchronous Information and Energy Transmission.

    Science.gov (United States)

    Qin, Danyang; Yang, Songxiang; Zhang, Yan; Ma, Jingya; Ding, Qun

    2017-06-09

    Wireless energy collecting technology can effectively reduce the network time overhead and prolong the wireless sensor network (WSN) lifetime. However, the traditional energy collecting technology cannot achieve the balance between ergodic channel capacity and average collected energy. In order to solve the problem of the network transmission efficiency and the limited energy of wireless devices, three improved scheduling mechanisms are proposed: improved signal noise ratio (SNR) scheduling mechanism (IS2M), improved N-SNR scheduling mechanism (INS2M) and an improved Equal Throughput scheduling mechanism (IETSM) for different channel conditions to improve the whole network performance. Meanwhile, the average collected energy of single users and the ergodic channel capacity of three scheduling mechanisms can be obtained through the order statistical theory in Rayleig, Ricean, Nakagami- m and Weibull fading channels. It is concluded that the proposed scheduling mechanisms can achieve better balance between energy collection and data transmission, so as to provide a new solution to realize synchronous information and energy transmission for WSNs.

  12. Scheduling Data Access in Smart Grid Networks Utilizing Context Information

    DEFF Research Database (Denmark)

    Findrik, Mislav; Grønbæk, Jesper; Olsen, Rasmus Løvenstein

    2014-01-01

    Current electrical grid is facing increased penetration of intermittent energy resources, in particular wind and solar energy. Fast variability of the power supply due to renewable energy resources can be balanced out using different energy storage systems or shifting the loads. Efficiently...... managing this fast flexibility requires two-way data exchange between a controller and sensors/meters via communication networks. In this paper we investigated scheduling of data collection utilizing meta-data from sensors that are describing dynamics of information. We show the applicability...

  13. Evolving health information technology and the timely availability of visit diagnoses from ambulatory visits: A natural experiment in an integrated delivery system

    Directory of Open Access Journals (Sweden)

    Brand Richard

    2009-07-01

    Full Text Available Abstract Background Health information technology (HIT may improve health care quality and outcomes, in part by making information available in a timelier manner. However, there are few studies documenting the changes in timely availability of data with the use of a sophisticated electronic medical record (EMR, nor a description of how the timely availability of data might differ with different types of EMRs. We hypothesized that timely availability of data would improve with use of increasingly sophisticated forms of HIT. Methods We used an historical observation design (2004–2006 using electronic data from office visits in an integrated delivery system with three types of HIT: Basic, Intermediate, and Advanced. We calculated the monthly percentage of visits using the various types of HIT for entry of visit diagnoses into the delivery system's electronic database, and the time between the visit and the availability of the visit diagnoses in the database. Results In January 2004, when only Basic HIT was available, 10% of office visits had diagnoses entered on the same day as the visit and 90% within a week; 85% of office visits used paper forms for recording visit diagnoses, 16% used Basic at that time. By December 2006, 95% of all office visits had diagnoses available on the same day as the visit, when 98% of office visits used some form of HIT for entry of visit diagnoses (Advanced HIT for 67% of visits. Conclusion Use of HIT systems is associated with dramatic increases in the timely availability of diagnostic information, though the effects may vary by sophistication of HIT system. Timely clinical data are critical for real-time population surveillance, and valuable for routine clinical care.

  14. Evolving health information technology and the timely availability of visit diagnoses from ambulatory visits: a natural experiment in an integrated delivery system.

    Science.gov (United States)

    Bardach, Naomi S; Huang, Jie; Brand, Richard; Hsu, John

    2009-07-17

    Health information technology (HIT) may improve health care quality and outcomes, in part by making information available in a timelier manner. However, there are few studies documenting the changes in timely availability of data with the use of a sophisticated electronic medical record (EMR), nor a description of how the timely availability of data might differ with different types of EMRs. We hypothesized that timely availability of data would improve with use of increasingly sophisticated forms of HIT. We used an historical observation design (2004-2006) using electronic data from office visits in an integrated delivery system with three types of HIT: Basic, Intermediate, and Advanced. We calculated the monthly percentage of visits using the various types of HIT for entry of visit diagnoses into the delivery system's electronic database, and the time between the visit and the availability of the visit diagnoses in the database. In January 2004, when only Basic HIT was available, 10% of office visits had diagnoses entered on the same day as the visit and 90% within a week; 85% of office visits used paper forms for recording visit diagnoses, 16% used Basic at that time. By December 2006, 95% of all office visits had diagnoses available on the same day as the visit, when 98% of office visits used some form of HIT for entry of visit diagnoses (Advanced HIT for 67% of visits). Use of HIT systems is associated with dramatic increases in the timely availability of diagnostic information, though the effects may vary by sophistication of HIT system. Timely clinical data are critical for real-time population surveillance, and valuable for routine clinical care.

  15. Toward a patient-centered ambulatory after-visit summary: Identifying primary care patients' information needs.

    Science.gov (United States)

    Clarke, Martina A; Moore, Joi L; Steege, Linsey M; Koopman, Richelle J; Belden, Jeffery L; Canfield, Shannon M; Kim, Min S

    2018-09-01

    The purpose of this study was to determine the information needs of primary care patients as they review clinic visit notes to inform information that should be contained in an after-visit summary (AVS). We collected data from 15 patients with an acute illness and 14 patients with a chronic disease using semi-structured interviews. The acute patients reviewed seven major sections, and chronic patients reviewed eight major sections of a simulated, but realistic visit note to identify relevant information needs for their AVS. Patients in the acute illness group identified the Plan, Assessment and History of Present Illness the most as important note sections, while patients in the chronic care group identified Significant Lab Data, Plan, and Assessment the most as important note sections. This study was able to identify primary care patients' information needs after clinic visit. Primary care patients have information needs pertaining to diagnosis and treatment, which may be the reason why both patient groups identified Plan and Assessment as important note sections. Future research should also develop and assess an AVS based on the information gathered in this study and evaluate its usefulness among primary care patients. The results of this study can be used to inform the development of an after-visit summary that assists patients to fully understand their treatment plan, which may improve treatment adherence.

  16. Research on information models for the construction schedule management based on the IFC standard

    Directory of Open Access Journals (Sweden)

    Weirui Xue

    2015-05-01

    Full Text Available Purpose: The purpose of this article is to study the description and extension of the Industry Foundation Classes (IFC standard in construction schedule management, which achieves the information exchange and sharing among the different information systems and stakeholders, and facilitates the collaborative construction in the construction projects. Design/methodology/approach: The schedule information processing and coordination are difficult in the complex construction project. Building Information Modeling (BIM provides the platform for exchanging and sharing information among information systems and stakeholders based on the IFC standard. Through analyzing the schedule plan, implementing, check and control, the information flow in the schedule management is reflected based on the IDEF. According to the IFC4, the information model for the schedule management is established, which not only includes the each aspect of the schedule management, but also includes the cost management, the resource management, the quality management and the risk management. Findings: The information requirement for the construction schedule management can be summarized into three aspects: the schedule plan information, the implementing information and the check and control information. The three aspects can be described through the existing and extended entities of IFC4, and the information models are established. Originality/value: The main contribution of the article is to establish the construction schedule management information model, which achieves the information exchange and share in the construction project, and facilitates the development of the application software to meet the requirements of the construction project.

  17. Reasons for declining extended information visit on prenatal screening among pregnant women and their partners.

    Science.gov (United States)

    Wätterbjörk, Inger; Sahlberg-Blom, Eva; Nilsson, Kerstin; Blomberg, Karin

    2015-12-01

    A two-step model on information on prenatal screening consists of brief information at the first visit at the Maternal Health Care Centre and an offer of extended information at a separate visit. There is a lack of knowledge why some pregnant women and their partners refrain from the extended information visit. The aim of this study was to explore their reasons. Eight qualitative interviews were analyzed using Interpretive Description. In the first theme 'From an individual view', the interviewees saw the invitation from their own points of view. They refrained because they did not want to receive any more information or had taken an individual position against chromosomal testing. In the theme, 'From a societal view', the interviewees perceived the offer as part of a societal view on prenatal screening that they could not support. The findings show that these interviewees' reasons of declining an extended information visit are multidimensional and influenced by different views, from both an individual perspective and a more societal one. Health care professionals should be aware that some persons could have a different view on health care services and could be reluctant to accept offered services. © 2015 John Wiley & Sons, Ltd.

  18. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  19. Does information about patients who are intellectually disabled translate into better cooperation during dental visits?

    NARCIS (Netherlands)

    Meurs, D.; Rutten, M.; de Jongh, A.

    2010-01-01

    The objective of this study was to investigate whether having background information about a patient with an intellectual disability (ID) would have a positive effect on the level of cooperation during a first dental visit. Study participants were 57 consecutive dental patients (mean age = 24.3

  20. College Students Understanding of Production Management and Master Production Schedule through Using a Real World Tool, Complimented with Company Tours and In- Class Visits, Provides an Excellent Learning Experience at Farmingdale State College

    Directory of Open Access Journals (Sweden)

    Jill Anne O'Sullivan

    2015-08-01

    Full Text Available Manufacturing is playing a significant role in its re-shoring into America. Companies are grappling with ways to obtain that competitive advantage by distinguishing themselves through their intellectual capabilities, process improvements, technology, people, shop floor management and information flows. The purpose of this paper is to describe the effort at Farmingdale State College to educate our students in understanding Production Management and Master Production Schedule (MPS. We are trying to prepare students for entry into the workforce. By using a Real world ERP tool in the classroom while complimenting this learning with touring local manufacturers who use this tool and having production control experts in our classrooms. [1] The opportunity presents itself for these students to visit real world manufacturers using the same tool these students use in the classroom, the Infor Visual ERP. Each semester students go to a local manufacturer to see how the product is made and the ERP system is used to make it. Each semester a subject matter expert, SME, in manufacturing comes into the class and talks about how they use their ERP to perform their functional responsibilities. Students go into these companies and sit down with these Production Manufacturing and IT SME's to see how they use the modules in their ERP system from estimating, Production Management, MPS to delivery and payment. From the manufacturing window to the Master Schedule Window students learn from these companies SME's just how they perform their functions, how they use this tool. Then that is replicated this in the classroom lab assignments for students to better understand Production Management, scheduling and work order integrity. They identify the desired schedule (forecast and populate a Master Production Schedule. They create a BOM with work orders adding operations and material. The Production Management/Control is the function of directing or regulating the movement of

  1. 76 FR 23860 - Financial Management Service Proposed Collection of Information: Schedule of Excess Risks

    Science.gov (United States)

    2011-04-28

    ... DEPARTMENT OF THE TREASURY Fiscal Service Financial Management Service Proposed Collection of Information: Schedule of Excess Risks AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Notice and request for comments. SUMMARY: The Financial Management Service, as part of its continuing...

  2. Beacon-based tourist information system to identify visiting trends of tourists

    Directory of Open Access Journals (Sweden)

    Akihiro Yamaguchi

    2017-11-01

    Full Text Available In this study, we propose a system that provides tourist information and obtains trends of visiting tourists using beacons and cloud service. As part of our research, we are working on the promotion of local area tourism in cooperation with a local community. A low energy Bluetooth device is used as a beacon to transmit a universally unique identifier. In addition, beacons are placed at sightseeing spots and tourist facilities. Our proposed system comprises two application programs; one is a client-side application program that provides area-specific tourist information corresponding to the detected beacon. The other is a server-side application to record time and location information of the detected beacons. In this paper, we describe the scheme of our system, and present the results of experiments conducted using the prototype system in the local tourist area. In addition, we discuss an open platform for information collection services using beacons.

  3. Real-Time Scheduling for Preventing Information Leakage with Preemption Overheads

    Directory of Open Access Journals (Sweden)

    BAEK, H.

    2017-05-01

    Full Text Available Real-time systems (RTS are characterized by tasks executing in a timely manner to meet its deadlines as a real-time constraint. Most studies of RTS have focused on these criteria as primary design points. However, recent increases in security threats to various real-time systems have shown that enhanced security support must be included as an important design point, retro-fitting such support to existing systems as necessary. In this paper, we propose a new pre-flush technique referred to as flush task reservation for FP scheduling (FTR-FP to conditionally sanitize the state of resources shared by real-time tasks by invoking a flush task (FT in order to mitigate information leakage/corruption of real-time systems. FTR-FP extends existing works exploiting FTs to be applicable more general scheduling algorithms and security model. We also propose modifications to existing real-time scheduling algorithms to implement a pre-flush technique as a security constraint, and analysis technique to verify schedulability of the real-time scheduling. For better analytic capability, our analysis technique provides a count of the precise number of preemptions that a task experiences offline. Our evaluation results demonstrate that our proposed schedulability analysis improves the performance of existing scheduling algorithms in terms of schedulability and preemption cost.

  4. ONLINE VS OFFLINE: DOES CITY IMAGE MODERATING COMPARISON BETWEEN INFLUENCE PERCEIVED BLOG INFORMATION AND REFERENCE GROUP TOWARD TOURIST VISIT INTENTION?

    OpenAIRE

    Angga Pandu Wijaya

    2017-01-01

    This research aims to investigating the phenomenon of perceived blog information, reference group, image of a city, and tourists’ intention to visit particular places. Perceived blog information is the online source, while the offline one is reference group. This is the first study comparing on online and offline information influence tourists’ intention to visit particular places. Samples are obtained through an electronic questionnaire involving 177 respondents and analyzed by using PLS-SEM...

  5. 76 FR 78950 - FBI Criminal Justice Information Services Division; Revised User Fee Schedule

    Science.gov (United States)

    2011-12-20

    ... amounts for volunteers, as explained at 75 FR 18752, and Centralized Billing Service Providers (CBSPs), as... Information Services Division; Revised User Fee Schedule AGENCY: Federal Bureau of Investigation (FBI.... Enourato, Section Chief, Resources Management Section, Criminal Justice Information Services Division, FBI...

  6. RingSys-Scheduler User`s manual. Information terminal for town monitoring; Brukermanual for RingSys-Scheduler. Informasjonsterminal for byovervaaking

    Energy Technology Data Exchange (ETDEWEB)

    Marsteen, L.

    1996-02-01

    This report is a User`s manual. It describes RingSys Scheduler, a computer system for continuous display of time series, public information and static pictures. The computer is connected to a host machine via modem and time series, and public information are automatically updated once an hour. RingSys-Scheduler is PC based. It is developed using Excel`s macro language as well as the asynchronous communication program Dynacomm`s script language. 12 figs.

  7. ONLINE VS OFFLINE: DOES CITY IMAGE MODERATING COMPARISON BETWEEN INFLUENCE PERCEIVED BLOG INFORMATION AND REFERENCE GROUP TOWARD TOURIST VISIT INTENTION?

    Directory of Open Access Journals (Sweden)

    Angga Pandu Wijaya

    2017-03-01

    Full Text Available This research aims to investigating the phenomenon of perceived blog information, reference group, image of a city, and tourists’ intention to visit particular places. Perceived blog information is the online source, while the offline one is reference group. This is the first study comparing on online and offline information influence tourists’ intention to visit particular places. Samples are obtained through an electronic questionnaire involving 177 respondents and analyzed by using PLS-SEM. The results reveal that perceived blog information and reference group significantly influence image of the city and the intention to visit tourism destination. Image of the city moderate the relationship between independent and dependent variables partially. The influence of perceived blog information is greater than the reference group. It is indicates that online information is more influential. The stakeholders of tourism sector can utilize blog in increasing the number of visitors.

  8. Information Flow Scheduling in Concurrent Multi-Product Development Based on DSM

    Science.gov (United States)

    Sun, Qing-Chao; Huang, Wei-Qiang; Jiang, Ying-Jie; Sun, Wei

    2017-09-01

    Multi-product collaborative development is adopted widely in manufacturing enterprise, while the present multi-project planning models don't take technical/data interactions of multiple products into account. To decrease the influence of technical/data interactions on project progresses, the information flow scheduling models based on the extended DSM is presented. Firstly, information dependencies are divided into four types: series, parallel, coupling and similar. Secondly, different types of dependencies are expressed as DSM units, and the extended DSM model is brought forward, described as a block matrix. Furthermore, the information flow scheduling methods is proposed, which involves four types of operations, where partitioning and clustering algorithm are modified from DSM for ensuring progress of high-priority project, merging and converting is the specific computation of the extended DSM. Finally, the information flow scheduling of two machine tools development is analyzed with example, and different project priorities correspond to different task sequences and total coordination cost. The proposed methodology provides a detailed instruction for information flow scheduling in multi-product development, with specially concerning technical/data interactions.

  9. 78 FR 44191 - Proposed Collection of Information: Annual Financial Statement of Surety Companies-Schedule F

    Science.gov (United States)

    2013-07-23

    ... Bureau of the Fiscal Service solicits comments concerning the Form FMS-6314 ``Annual Financial Statement... described below: Title: Annual Financial Statement of Surety Companies--Schedule F. OMB Number: 1510-0012... DEPARTMENT OF THE TREASURY Fiscal Service Proposed Collection of Information: Annual Financial...

  10. Informed and patient-centered decision-making in the primary care visits of African Americans with depression.

    Science.gov (United States)

    Hines, Anika L; Roter, Debra; Ghods Dinoso, Bri K; Carson, Kathryn A; Daumit, Gail L; Cooper, Lisa A

    2018-02-01

    We examined the prevalence and extent of informed decision-making (IDM) and patient-centered decision-making (PCDM) in primary care visits of African Americans with depression. We performed a cross-sectional analysis of audiotaped clinical encounters and post-visit surveys of 76 patients and their clinicians. We used RIAS to characterize patient-centeredness of visit dialogue. IDM entailed discussion of 3 components: the nature of the decision, alternatives, and pros/cons. PCDM entailed discussion of: lifestyle/coping strategies, knowledge/beliefs, or treatment concerns. We examined the association of IDM and PCDM with visit duration, overall patient-centeredness, and patient/clinician interpersonal ratings. Approximately one-quarter of medication and counseling decisions included essential IDM elements and 40% included at least one PCDM element. In high patient-centered visits, IDM was associated with patients feeling respected in counseling and liking clinicians in medication decisions. IDM was not related to clinician ratings. In low patient-centered visits, PCDM in counseling decisions was positively associated with patients feeling respected and clinicians respecting patients. The associations between IDM and PCDM with interpersonal ratings was moderated by overall patient-centeredness of the visit, which may be indicative of broader cross-cultural communication issues. Strengthening partnerships between depressed African Americans and their clinicians may improve patient-engaged decision-making. Copyright © 2017 Elsevier B.V. All rights reserved.

  11. The visit-data warehouse: enabling novel secondary use of health information exchange data.

    Science.gov (United States)

    Fleischman, William; Lowry, Tina; Shapiro, Jason

    2014-01-01

    Health Information Exchange (HIE) efforts face challenges with data quality and performance, and this becomes especially problematic when data is leveraged for uses beyond primary clinical use. We describe a secondary data infrastructure focusing on patient-encounter, nonclinical data that was built on top of a functioning HIE platform to support novel secondary data uses and prevent potentially negative impacts these uses might have otherwise had on HIE system performance. HIE efforts have generally formed for the primary clinical use of individual clinical providers searching for data on individual patients under their care, but many secondary uses have been proposed and are being piloted to support care management, quality improvement, and public health. This infrastructure review describes a module built into the Healthix HIE. Healthix, based in the New York metropolitan region, comprises 107 participating organizations with 29,946 acute-care beds in 383 facilities, and includes more than 9.2 million unique patients. The primary infrastructure is based on the InterSystems proprietary Caché data model distributed across servers in multiple locations, and uses a master patient index to link individual patients' records across multiple sites. We built a parallel platform, the "visit data warehouse," of patient encounter data (demographics, date, time, and type of visit) using a relational database model to allow accessibility using standard database tools and flexibility for developing secondary data use cases. These four secondary use cases include the following: (1) tracking encounter-based metrics in a newly established geriatric emergency department (ED), (2) creating a dashboard to provide a visual display as well as a tabular output of near-real-time de-identified encounter data from the data warehouse, (3) tracking frequent ED users as part of a regional-approach to case management intervention, and (4) improving an existing quality improvement program

  12. Health Information Sources, Perceived Vaccination Benefits, and Maintenance of Childhood Vaccination Schedules.

    Science.gov (United States)

    Hwang, Juwon; Shah, Dhavan V

    2018-06-05

    Parental concerns over the safety or necessity of childhood vaccination have increased over the past decades. At the same time, there has been a proliferation of vaccine-related information available through a range of health information sources. This study investigates the associations between evaluations of health information sources, parental perceptions of childhood vaccination benefits, and the maintenance of vaccination schedules for their children. Specifically, this study aims to (a) incorporate social media into the battery of health information sources and (b) differentiate households with a childhood autism diagnosis and those without, given unsubstantiated but persistent concerns about vaccine safety and autism. Analyzing a sample of U.S. households, a total of 4,174 parents who have at least one child under the age of 18 were analyzed, including 138 of parents of households with a childhood autism diagnosis. Results show that the more the parents value interpersonal communication and magazines as sources of health information, the more they perceive vaccination benefits, and the more the value they put on television, the better they keep vaccination schedules up-to-date for their children. On the other hand, social media are negatively associated with their perceptions of vaccination benefits. Although parents of children diagnosed with autism are less likely to perceive vaccination benefits, no interaction effects with evaluations of health information sources are found on parental perceptions of vaccination benefits or maintenance of schedules.

  13. 78 FR 29777 - Agency Information Collection Activities: New Collection; Survey of Supervised Visitation and...

    Science.gov (United States)

    2013-05-21

    ... opportunity for communities to support the supervised visitation and safe exchange of children in situations involving domestic violence, dating violence, child abuse, sexual assault, or stalking. (5) An estimate of...

  14. Health behaviour information provided to clients during midwife-led prenatal booking visits: Findings from video analyses.

    NARCIS (Netherlands)

    Baron, R.; Martin, L.; Gitsels-van der Wal, J.T.; Noordman, J.; Heymans, M.W.; Spelten, E.R.; Brug, J.; Hutton, E.K.

    2017-01-01

    OBJECTIVE: to quantify to what extent evidence-based health behaviour topics relevant for pregnancy are discussed with clients during midwife-led prenatal booking visits and to assess the association of client characteristics with the extent of information provided. DESIGN: quantitative video

  15. Health behaviour information provided to clients during midwife-led prenatal booking visits : Findings from video analyses

    NARCIS (Netherlands)

    Baron, R.; Martin, L.; Gitsels-van der Wal, J.T.; Noordman, J.; Heymans, M.W.; Spelten, E.R.; Brug, J.; Hutton, E.K.

    2017-01-01

    Objective to quantify to what extent evidence-based health behaviour topics relevant for pregnancy are discussed with clients during midwife-led prenatal booking visits and to assess the association of client characteristics with the extent of information provided. Design quantitative video

  16. Health behaviour information provided to clients during midwife-led prenatal booking visits: findings from video analyses.

    NARCIS (Netherlands)

    Baron, R.; Martin, L.; Gitsels-van der Wal, J.T.; Noordman, J.; Heymans, M.W.; Spelten, E.; Brug, J.; Hutton, E.K.

    2017-01-01

    Objective: to quantify to what extent evidence-based health behaviour topics relevant for pregnancy are discussed with clients during midwife-led prenatal booking visits and to assess the association of client characteristics with the extent of information provided. Design: quantitative video

  17. Learning where to feed: the use of social information in flower-visiting Pallas' long-tongued bats (Glossophaga soricina).

    Science.gov (United States)

    Rose, Andreas; Kolar, Miriam; Tschapka, Marco; Knörnschild, Mirjam

    2016-03-01

    Social learning is a widespread phenomenon among vertebrates that influences various patterns of behaviour and is often reported with respect to foraging behaviour. The use of social information by foraging bats was documented in insectivorous, carnivorous and frugivorous species, but there are little data whether flower-visiting nectarivorous bats (Phyllostomidae: Glossophaginae) can acquire information about food from other individuals. In this study, we conducted an experiment with a demonstrator-observer paradigm to investigate whether flower-visiting Pallas' long-tongued bats (Glossophaga soricina) are able to socially learn novel flower positions via observation of, or interaction with, knowledgeable conspecifics. The results demonstrate that flower-visiting G. soricina are able to use social information for the location of novel flower positions and can thereby reduce energy-costly search efforts. This social transmission is explainable as a result of local enhancement; learning bats might rely on both visual and echo-acoustical perception and are likely to eavesdrop on auditory cues that are emitted by feeding conspecifics. We additionally tested the spatial memory capacity of former demonstrator bats when retrieving a learned flower position, and the results indicate that flower-visiting bats remember a learned flower position after several weeks.

  18. A Visit to a New Zealand School: Informal but On-Task, Strict but Caring.

    Science.gov (United States)

    Hopfengardner, Jerrold D.; O'Dell, Frank L.

    1989-01-01

    Describes a visit by two educators to a primary school in Auckland, New Zealand. Discusses the development of children, educational goals, traditions, curricula, administration, and facilities of this New Zealand school. Finds the major difference is the New Zealand school's child-centered approach. (MS)

  19. Value of information in sequential decision making: Component inspection, permanent monitoring and system-level scheduling

    International Nuclear Information System (INIS)

    Memarzadeh, Milad; Pozzi, Matteo

    2016-01-01

    We illustrate how to assess the Value of Information (VoI) in sequential decision making problems modeled by Partially Observable Markov Decision Processes (POMDPs). POMDPs provide a general framework for modeling the management of infrastructure components, including operation and maintenance, when only partial or noisy observations are available; VoI is a key concept for selecting explorative actions, with application to component inspection and monitoring. Furthermore, component-level VoI can serve as an effective heuristic for assigning priorities to system-level inspection scheduling. We introduce two alternative models for the availability of information, and derive the VoI in each of those settings: the Stochastic Allocation (SA) model assumes that observations are collected with a given probability, while the Fee-based Allocation model (FA) assumes that they are available at a given cost. After presenting these models at component-level, we investigate how they perform for system-level inspection scheduling. - Highlights: • On the Value of Information in POMDPs, for optimal exploration of systems. • A method for assessing the Value of Information of permanent monitoring. • A method for allocating inspections in systems made up by parallel POMDPs.

  20. 17 CFR 289.101 - Schedule A. Information required in reports pursuant to § 289.3.

    Science.gov (United States)

    2010-04-01

    ... TO SECTION 13(a) OF THE INTERNATIONAL FINANCE CORPORATION ACT § 289.101 Schedule A. Information... allowed or paid to dealers. If any dealers are to act in the capacity of sub-underwriters and are to be...

  1. Factors associated with patient recall of key information in ambulatory specialty care visits: Results of an innovative methodology.

    Science.gov (United States)

    Laws, M Barton; Lee, Yoojin; Taubin, Tatiana; Rogers, William H; Wilson, Ira B

    2018-01-01

    While some studies have assessed patient recall of important information from ambulatory care visits, none has done so recently. Furthermore, little is known about features of clinical interactions which are associated with patient understanding and recall, without which shared decision making, a widely shared ideal for patient care, cannot occur. Our objective was to evaluate characteristics of patients and outpatient encounters associated with patient recall of information after one week, along with observation of elements of shared decision making. This was an observational study based on coded transcripts of 189 outpatient encounters, and post-visit interviews with patients 1 week later. Coding used three previously validated systems, adopted for this study. Forty-nine percent of decisions and recommendations were recalled accurately without prompting; 36% recalled with a prompt; 15% recalled erroneously or not at all. Provider behaviors hypothesized to be associated with patient recall, such as open-questioning and "teach back," were rare. Patients with less than high school education recalled 38% of items freely and accurately, while patients with a college degree recalled 65% (p total number of items to be recalled per visit, and percentage of utterances in decision-making processes by the provider ("verbal dominance"), were significant predictors of poorer recall. The item count was associated with poorer recall for lower, but not higher, educated patients.

  2. Chernobyl today. Impressions and informations from a visit to the nuclear power plant in July 1995

    International Nuclear Information System (INIS)

    Kraemer, J.

    1996-01-01

    A visit to Chernobyl by Western experts was organized within the 1995 Nuclear Technology Conference. The region, which had been evacuated after the reactor accident in the Chernobyl-4 nuclear generating unit on April 26, 1986, now again offers employment to some 15,000 people. 120 scientific organizations are conducting studies in the protected zone. No indications of any consequences of the accident can be seen in the natural environment. As the manager of the power plant put it: 'This is a good region to live in.' In order to maintain this standard of living, the agencies responsible in Ukraine plan to repair unit 2, which has been down because of a fire in the turbine building since 1991, resynchronize it with the power grid, and run it up until 2002. Unit 1 is to be decommissioned in 1998; unit 3, in 2001. The biggest problem on site is the stability of the sarcophagus around unit 4. (orig./UA) [de

  3. 77 FR 44675 - Agency Information Collection Activities; Submission for OMB Review; Comment Request: Site Visit...

    Science.gov (United States)

    2012-07-30

    ... Poverty (POP), Energy Training Partnership (ETP), State Energy Sector Partnership (SESP), and Health Care... penalty for failing to comply with a collection of information if the collection of information does not...

  4. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  5. Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

    International Nuclear Information System (INIS)

    Seed, Ian; James, Paula; Mathieson, John; Judd, Laurie; Elmetti-Ramirez, Rosa; Han, Ana

    2013-01-01

    With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchange through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple organizations and

  6. Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

    Energy Technology Data Exchange (ETDEWEB)

    Seed, Ian; James, Paula [Cogentus Consulting (United States); Mathieson, John [NDA United Kingdom (United Kingdom); Judd, Laurie [NuVision Engineering, Inc. (United States); Elmetti-Ramirez, Rosa; Han, Ana [US DOE (United States)

    2013-07-01

    With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchange through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple organizations and

  7. A Study on the Effect on Scheduling and Management of Surgeries with the Introduction of Excellent Medical Information.

    Science.gov (United States)

    Mei, Tsai Ching

    2016-01-01

    The services of OR play an important role in the medical business for department of surgery. The most important issue for OR is about the scheduling and management of surgeries. Good surgery schedule could elevate the utilization efficiency of OR. Therefore, the introduction of excellent medical information can both dramatically elevate the work efficiency of health care employees and reduce workload to reach win-win benefits in both management and performance.

  8. Quality and accuracy of sexual health information web sites visited by young people.

    Science.gov (United States)

    Buhi, Eric R; Daley, Ellen M; Oberne, Alison; Smith, Sarah A; Schneider, Tali; Fuhrmann, Hollie J

    2010-08-01

    We assessed online sexual health information quality and accuracy and the utility of web site quality indicators. In reviewing 177 sexual health web sites, we found below average quality but few inaccuracies. Web sites with the most technically complex information and/or controversial topics contained the most inaccuracies. We found no association between inaccurate information and web site quality. (c) 2010 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  9. Informal payments for healthcare services and short-term effects of the introduction of visit fee on these payments in Hungary.

    Science.gov (United States)

    Baji, Petra; Pavlova, Milena; Gulácsi, László; Zsófia, Homolyáné Csete; Groot, Wim

    2012-01-01

    The objective of this paper is to study the short-term effects of the introduction of the visit fee in Hungary in 2007 on informal patient payments. We present the pattern of informal payments in primary, out-patient specialist and in in-patient care in the period before and shortly after the visit fee was introduced. We also analyse whether in the short run, the introduction of visit fee decreased the probability of paying informally. For the analysis, we use a dataset for a representative sample of 2500 respondents collected in 2007 shortly after the introduction of the visit fee, which contains data on informal payments for healthcare services. According to our results, 9% of the patients paid informally during their last visit to GP (2 Euros on average), 14% paid informally for specialist care (35 Euros on average) and 50% paid informally for hospitalisation (58 Euros on average). We find a significant reduction in the probability of paying informally only for elderly patients in case of in-patient care. Our results suggest that informal payments are widely spread in Hungary, especially in in-patient care. The short run potential of the introduction of the visit fee to reduce informal payments seems to be minor. Copyright © 2011 John Wiley & Sons, Ltd.

  10. Spanish Visit

    CERN Multimedia

    2004-01-01

    On 23 January, CERN welcomed a visit by Pedro Morenés Eulate, Spanish Secretary of State for Scientific and Technological Policy. He was taken on a tour of the LHC Superconducting test facility, the CMS magnet assembly hall and the civil engineering works at Point 5. After a brief presentation on the AMS (Alpha Magnetic Spectrometer) experiment, delivered by Sam Ting, and lunch hosted by Director General Robert Aymar, he continued his tour of the ATLAS assembly hall and the ISOLDE experimental hall. Pedro Morenés finished his visit by meeting with the Spanish scientific community working at CERN. From left to right: Juan-Antonio Rubio, CERN, Responsible for the Education & Communication, Technology transfer and Scientific Information groups; Gonzalo León, General Secretary of the Spanish Ministry; Joaquín Pérez-Villanueva y Tovar, Ambassador, Permanent Representative of Spain to the United Nations Office; Robert Aymar, CERN Director General; Maria-José Garcia-Borge, ISOLDE and NTOF, CSIC Madrid Tea...

  11. Visit safety

    CERN Document Server

    2012-01-01

    Experiment areas, offices, workshops: it is possible to have co-workers or friends visit these places.     You already know about the official visits service, the VIP office, and professional visits. But do you know about the safety instruction GSI-OHS1, “Visits on the CERN site”? This is a mandatory General Safety Instruction that was created to assist you in ensuring safety for all your visits, whatever their nature—especially those that are non-official. Questions? The HSE Unit will be happy to answer them. Write to safety-general@cern.ch.   The HSE Unit

  12. Visit ISOLDE!

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    CERN Internal Communication is organising a visit to ISOLDE – an opportunity for you to see the CERN set-up that can produce over 1000 different isotopes!   If you wish to participate, you can sign up for a visit by sending us an e-mail. Note that the visits will take place between 18 and 22 February, and will be open only to CERN access-card holders.   The visit will include an introduction by experts and a tour of the ISOLDE set-up. NB: For security reason, pregnant women and kids under the age of 16 can not take the tour.  

  13. Visit Itinerary

    CERN Multimedia

    2002-01-01

    The visit itinerary includes five area of halls 191 and 180:. End-Cap Toroid Integration Area . Barrel Toroid Integration Area . Cryogenic Test Facility for Toroid Magnets and Helium Pumps . Liquid Argon Cryostats Assembly Area . Central Solenoid Magnet Test Station

  14. A Self-Determination Perspective on Online Health Information Seeking: The Internet vs. Face-to-Face Office Visits With Physicians.

    Science.gov (United States)

    Lee, Seow Ting; Lin, Julian

    2016-06-01

    This study elucidates the experiential and motivational aspects of online health information beyond the theoretically limited instrumental perspective that dominates the extant literature. Based on a sample of 993 online health information seekers in India, the survey found that online health information seeking offers individuals greater autonomy, competence, and relatedness compared to face-to-face office visits with physicians. According to self-determination theory, individuals are motivated to act by a sense of volition and experience of willingness, validation of one's skills and competencies, and feeling of connection with others who shaped one's decisions. These 3 psychological needs, which motivate individuals to pursue what they innately seek as human beings, help explain why individuals turn online for health information. T tests showed that all 3 self-determination theory constructs -autonomy, competence, and relatedness-were higher for online health information seeking than for face-to-face office visits with physicians. A regression analysis found that 2 variables, autonomy and relatedness, explained online health information seeking. Competence was not a significant factor, likely because of competency issues faced by individuals in interpreting, understanding, and making use of online health information. The findings, which do not suggest that online health information seeking would displace physicians as many have feared, offer promise for an integrated system of care. Office visits with physicians would necessarily evolve into an expanded communicative space of health information seeking instead of an alternative channel for health information.

  15. Croatian visit

    CERN Multimedia

    2004-01-01

    On 11 December, President Stjepan Mesic of the Republic of Croatia visited CERN. He was welcomed by Director General, Robert Aymar, and the President of CERN Council, Maurice Bourquin. Afterwards he met, among others, the Directors of CERN and Croatian scientists working here. He finished his tour by visiting the underground cavern for the ATLAS experiment. The arrival at CERN of the President of the Republic of Croatia, Stjepan Mesic. In the first row, from left to right: Maurice Bourquin, President of CERN Council, Stjepan Mesic, President of the Republic of Croatia and Robert Aymar, Director General of CERN.

  16. Polish visit

    CERN Document Server

    2003-01-01

    On 6 October, Professor Michal Kleiber, Polish Minister of Science and Chairman of the State Committee for Scientific Research, visited CERN and met both the current and designated Director General, Luciano Maiani and Robert Aymar. Professor Kleiber visited the CMS and ATLAS detector assembly halls, the underground cavern for ATLAS, and the LHC superconducting magnet string test hall. Michal Kleiber (left), Polish minister of science and Jan Krolikowski, scientist at Warsaw University and working for CMS, who shows the prototypes of the Muon Trigger board of CMS.

  17. Vaccinating my way--use of alternative vaccination schedules in New York State.

    Science.gov (United States)

    Nadeau, Jessica A; Bednarczyk, Robert A; Masawi, Munyaradzi R; Meldrum, Megan D; Santilli, Loretta; Zansky, Shelley M; Blog, Debra S; Birkhead, Guthrie S; McNutt, Louise-Anne

    2015-01-01

    To identify children vaccinated following an alternative vaccine schedule using immunization information system data and determine the impact of alternative schedule use on vaccine coverage. Children born in New York State, outside New York City, between January 1, 2009 and August 14, 2011 were assessed for vaccination patterns consistent with use of an alternative schedule. Children who by 9 months of age had at least 3 vaccination visits recorded in the statewide mandatory immunization information system after 41 days of age were classified as either attempting to conform to the Centers for Disease Control and Prevention published recommended vaccination schedule or an alternative schedule. The number of vaccination visits and up-to-date status at age 9 months were compared between groups. Of the 222 628 children studied, the proportion of children following an alternative schedule was 25%. These children were significantly less likely to be up-to-date at age 9 months (15%) compared with those conforming to the routine schedule (90%, P Children following an alternative schedule on average had about 2 extra vaccine visits compared with children following a routine schedule (P children in this study appear to be intentionally deviating from the routine schedule. Intentional deviation leads to poor vaccination coverage leaving children vulnerable to infection and increasing the potential for vaccine-preventable disease outbreaks. Copyright © 2015 Elsevier Inc. All rights reserved.

  18. Integration of a Course Enrolment and Class Timetable Scheduling in a Student Information System

    OpenAIRE

    Vangel V. Ajanovski

    2013-01-01

    This paper is dealing with the most important issues of two of the most significant university administrativeprocesses – the process of term enrolment with course enrolment and the process of organization of classesand scheduling a conflict-free class timetable. In the first part of the paper an introduction to the problemis set and the impact and interrelation of the two processes is explained in detail. In the second part of thepaper, the focus is on the process of class timetable schedulin...

  19. A pre-visit tailored website enhances counselees’ realistic expectations and knowledge and fulfils information needs for breast cancer genetic counselling.

    NARCIS (Netherlands)

    Albada, A.; Dulmen, S. van; Lindhout, D.; Bensing, J.M.; Ausems, M.G.E.M.

    2012-01-01

    Counselees who are the first in their family to request breast cancer genetic counselling often don't know what to expect or have unrealistic expectations of genetic counselling. Receiving tailored information might help them to prepare for their first visit. We conducted a study of the effects of a

  20. European visit

    CERN Multimedia

    2006-01-01

    The European Commissioner for Science and Research, Janez Potočnik, (on the right) visited the CMS assembly hall accompanied by Jim Virdee, Deputy Spokesman of CMS (on the left), and Robert Aymar, Director-General of CERN. The European Commissioner for Science and Research, Janez Potočnik, visited CERN on Tuesday 31 January. He was welcomed by the Director-General, Robert Aymar, who described the missions and current activities of CERN to him, in particular the realisation of the LHC with its three components: accelerator, detectors, storage and processing of data. The European Commissioner then visited the CMS assembly hall, then the hall for testing the LHC magnets and the ATLAS cavern. During this first visit since his appointment at the end of 2004, Janez Potočnik appeared very interested by the operation of CERN, an example of successful scientific co-operation on a European scale. The many projects (30 on average) that CERN and the European Commission carry out jointly for the benefit of res...

  1. Cosmic visits

    CERN Multimedia

    Stefania Pandolfi

    2015-01-01

    On Saturday, 19 September, ESA astronaut Luca Parmitano and Amalia Ercoli Finzi, Principal Investigator of the SD2 experiment on board the ESA Rosetta spacecraft, visited the AMS Control Centre and other CERN installations.   From left to right: Sergio Bertolucci (CERN Director of Research and Computing), Amalia Ercoli Finzi (Emeritus Professor in the Aerospace department of the Polytechnic University of Milan and Principal Investigator of the SD2 experiment on board the ESA Rosetta spacecraft), Maurice Bourquin (AMS-02 Senior Scientist and Honorary Professor in the Nuclear and Corpuscular Physics department of the University of Geneva) and Luca Parmitano (Major in the Italian Air Force and European Space Agency astronaut) in the AMS Payload and Operation Control Centre. They were welcomed in the early morning by Sergio Bertolucci and then headed to the Prévessin site to visit the CERN Control Centre and the Payload and Operation Control Centre (POCC) of the Alpha Magnetic Sp...

  2. Armenian visit

    CERN Multimedia

    2003-01-01

    During his visit to CERN on 4 July 2003, Karen Chshmaritian, Armenian Minister for Trade and Economic Development, toured the ATLAS experimental cavern and assembly hall. From left to right: Aram Kotzinian, from the international organization JINR from Dubna, Marzio Nessi from ATLAS, Karen Chshmaritian, Armenian Minister for Trade and Economic Development, Zohrab Mnatsakanian, Ambassador at the Permanent Mission of the Republic of Armenia to the United Nations in Geneva, Alexandre Sissakian, Vice-Director of JINR and Peter Jenni, ATLAS spokesman.

  3. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  4. VISIT - Virtual visits to nuclear power plants

    International Nuclear Information System (INIS)

    Mollaret, Jean-Christophe

    2001-01-01

    For more than twenty years, EDFs Communication Division has conducted a policy of opening its generation sites to the general public. Around 300,000 people visit a nuclear power plant every year. However, for the security of persons and the safety of facilities, those parts of the plant situated in controlled areas are not accessible to visitors. For the sake of transparency, EDF has taken an interest in the technologies offered by virtual reality to show the general public what a nuclear power plant is really like, so as to initiate dialogue on nuclear energy, particularly with young people. Visit has been developed with virtual reality technologies. It serves to show the invisible (voyage to the core of fission), the inaccessible and to immerse the visitors in environments which are usually closed to the general public (discovery of the controlled area of a nuclear power plant). Visit is used in Public Information Centres which receive visitors to EDF power plants and during international exhibitions and conferences. Visit allows a virtual tour of the following controlled areas: locker room hot area/cold area, a necessary passage before entering the controlled areas; reactor building; fuel building; waste auxiliary building (liquid, solid and gaseous effluents). It also includes a tour of the rooms or equipment usually accessible to the general public: control room, turbine hall, transformer, air cooling tower

  5. 17 CFR 230.490 - Information to be furnished under paragraph (3) of Schedule B.

    Science.gov (United States)

    2010-04-01

    ..., rate of interest, and date of maturity of each such issue. ... Governments Or Political Subdivisions Thereof § 230.490 Information to be furnished under paragraph (3) of... the detailed information specified in paragraph (3) as to issues of outstanding funded debt the...

  6. Canadian Academic Library Support for International Faculty: Library Experience and Information Needs of Chinese Visiting Scholars at the University of Western Ontario

    Directory of Open Access Journals (Sweden)

    Shiyi Xie

    2012-12-01

    Full Text Available International faculty constitute a relatively small proportion of the library user community in Canadian post-secondary institutions, but they are underserved when compared to other user groups on campus, particularly international students. The author obtained first hand information about Chinese visiting scholars at the University of Western Ontario, and in this paper she presents conclusions from her experience regarding the visiting scholars' use of libraries as well as some recommendations for serving international faculty. The author suggests that academic libraries carefully consider international faculty when planning relevant services for diverse user groups. Providing necessary and satisfying library services for this group of patrons is an excellent opportunity to better serve academic communities and to demonstrate that academic libraries are an important partner in supporting their university's international initiatives.

  7. 17 CFR 240.14a-101 - Schedule 14A. Information required in proxy statement.

    Science.gov (United States)

    2010-04-01

    ... days prior to the date the votes, consents or authorizations may be used to effect the corporate action... address, including ZIP Code, of the principal executive offices of the registrant, unless such information..., directing, or arranging for the financing of any such committee or group; (iv) Any person who finances or...

  8. wayGoo recommender system: personalized recommendations for events scheduling, based on static and real-time information

    Science.gov (United States)

    Thanos, Konstantinos-Georgios; Thomopoulos, Stelios C. A.

    2016-05-01

    wayGoo is a fully functional application whose main functionalities include content geolocation, event scheduling, and indoor navigation. However, significant information about events do not reach users' attention, either because of the size of this information or because some information comes from real - time data sources. The purpose of this work is to facilitate event management operations by prioritizing the presented events, based on users' interests using both, static and real - time data. Through the wayGoo interface, users select conceptual topics that are interesting for them. These topics constitute a browsing behavior vector which is used for learning users' interests implicitly, without being intrusive. Then, the system estimates user preferences and return an events list sorted from the most preferred one to the least. User preferences are modeled via a Naïve Bayesian Network which consists of: a) the `decision' random variable corresponding to users' decision on attending an event, b) the `distance' random variable, modeled by a linear regression that estimates the probability that the distance between a user and each event destination is not discouraging, ` the seat availability' random variable, modeled by a linear regression, which estimates the probability that the seat availability is encouraging d) and the `relevance' random variable, modeled by a clustering - based collaborative filtering, which determines the relevance of each event users' interests. Finally, experimental results show that the proposed system contribute essentially to assisting users in browsing and selecting events to attend.

  9. Reconciling a "pleasant exchange" with evidence of information bias: A three-country study on pharmaceutical sales visits in primary care.

    Science.gov (United States)

    Reynolds, Ellen; Guénette, Line; Lexchin, Joel; Cassels, Alan; Wilkes, Michael S; Durrieu, Geneviève; Beaulieu, Marie-Dominique; Mintzes, Barbara

    2018-03-01

    To examine and compare the experiences and attitudes of primary care physicians in three different regulatory environments (United States, Canada, and France) towards interactions with pharmaceutical sales representatives, particularly their perspectives on safety information provision and self-reported influences on prescribing. We recruited primary care physicians for 12 focus groups in Montreal, Sacramento, Toulouse and Vancouver. A thematic analysis of the interview data followed a five-stage framework analysis approach. Fifty-seven family physicians (19 women, 38 men) participated. Physicians expected a commercial bias and generally considered themselves to be immune from influence. They also appreciated the exchange and the information on new drugs. Across all sites, physicians expressed concern about missing harm information; however, attitudes to increased regulation of sales visits in France and the US were generally negative. A common solution to inadequate harm information was to seek further commercially sourced information. Physicians at all sites also expressed sensitivity to critiques from medical students and residents about promotional interactions. Physicians have contradictory views on the inadequate harm information received from sales representatives, linked to their lack of awareness of the drugs' safety profiles. Commonly used strategies to mitigate information bias are unlikely to be effective. Alternate information sources to inform prescribing decisions, and changes in the way that physicians and sales representatives interact are needed. Copyright © 2018 Elsevier B.V. All rights reserved.

  10. Flexible Scheduling May Have a Positive Impact on School Library Circulation. A Review of: Gavigan, K., Pribesh, S., & Dickinson, G. (2010. Fixed or flexible schedule? Schedule impacts and school library circulation. Library and Information Science Research, 32(2, 131-37.

    Directory of Open Access Journals (Sweden)

    Ann Medaille

    2011-03-01

    Full Text Available Objective – To determine whether a significant, positive relationship exists between flexible scheduling in elementary school library media centers and per-pupil circulation statistics.Design – Online survey.Setting – Library media centers in public elementary schools in two states of the United States.Subjects – A total of 88 elementary school library media specialists completed the survey.Methods – A 22-question online survey was created using Inquisite software. A link to the survey was sent via e-mail to a 600-person random sample of public school library media specialists whose names were drawn from the memberships of the North Carolina School Library Media Association and the Virginia Educational Media Association, with combined memberships totalling approximately 2,000. A random sample of 600 was chosen to provide a 95% confidence level with a confidence interval of plus or minus three points. The survey included questions about school schedules (flexible, partially flexible, or fixed, collection size, circulation statistics, total student enrolment, school type (elementary, middle, or high, school location (urban, rural, or suburban, percentage of students eligible for free and reduced price lunch, numbers of full-time professional library media specialists employed at the school, access procedures, and library closure information. The survey response rate was 29.3% (176 respondents. Because fixed versus flexible scheduling is an issue that primarily affects elementary schools, the authors further narrowed their subject pool to 88 elementary school respondents. Data were analyzed using SPSS 16.0 statistical software. Correlation analysis, including the analysis of covariance (ANCOVA, was used to compare differences in the three scheduling types and to control for other variables (such as location, socioeconomic status, collection size, staffing, days closed, and others that may affect circulation.Main Results – Of the 88

  11. EU Commissioner visits CERN

    CERN Multimedia

    2005-01-01

    European Commissioner Viviane Reding in front of one of the computers showing how the Grid works and, from left to right, Robert Aymar, CERN's Director-General, Wolfgang von Rüden, Head of the Information Technology Department, and Bob Jones, the newly appointed director of the EGEE project since 1st November. Viviane Reding, European Commissioner for Information Society and Media, visited CERN on 28 October. Accompanied throughout by CERN's Director-General, Robert Aymar, and the Head of the Information Technology Department, Wolfgang von Rüden, the Commissioner visited the ATLAS cavern before going on to the Information Technology Department, where she was given a complete overview of CERN's activities in the strategic field of Grid computing. Viviane Reding's visit coincided with the end of the EGEE (Enabling Grids for E-sciencE) conference, which took place in Pisa in Italy. Co-ordinated by CERN and funded by the European Commission, the EGEE project aims to set up a worldwide grid infrastructure for sc...

  12. 20 CFR 416.919n - Informing the medical source of examination scheduling, report content, and signature requirements.

    Science.gov (United States)

    2010-04-01

    ... scheduling, report content, and signature requirements. 416.919n Section 416.919n Employees' Benefits SOCIAL... medical source of examination scheduling, report content, and signature requirements. The medical sources... report containing all of the elements in paragraph (c). (e) Signature requirements. All consultative...

  13. 20 CFR 404.1519n - Informing the medical source of examination scheduling, report content, and signature requirements.

    Science.gov (United States)

    2010-04-01

    ... scheduling, report content, and signature requirements. 404.1519n Section 404.1519n Employees' Benefits... medical source of examination scheduling, report content, and signature requirements. The medical sources... report containing all of the elements in paragraph (c). (e) Signature requirements. All consultative...

  14. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  15. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  16. Using technology to enhance the quality of home health care: three case studies of health information technology initiatives at the visiting nurse service of New York.

    Science.gov (United States)

    Russell, David; Rosenfeld, Peri; Ames, Sylvia; Rosati, Robert J

    2010-01-01

    There is a growing recognition among health services researchers and policy makers that Health Information Technology (HIT) has the potential to address challenging issues that face patients and providers of healthcare. The Visiting Nurse Service of New York (VNSNY), a large not-for-profit home healthcare agency, has integrated technology applications into the service delivery model of several programs. Case studies, including the development and implementation, of three informatics initiatives at VNSNY are presented on: (1) Quality Scorecards that utilize process, outcomes, cost, and satisfaction measures to assess performance among clinical staff and programs; (2) a tool to identify patients at risk of being hospitalized, and (3) a predictive model that identifies patients who are eligible for physical rehabilitation services. Following a description of these initiatives, we discuss their impact on quality and process indicators, as well as the opportunities and challenges to implementation. © 2010 National Association for Healthcare Quality.

  17. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  18. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  19. SM18 Visits and Access

    CERN Multimedia

    2012-01-01

      VISITS The rules and conditions to be followed for visits in the SM18 Hall are laid out in the EDMS 1205328 document. No visit is allowed without prior reservation.   ACCESS Special access right is needed ONLY from 7 p.m. to 7 a.m. and during week-ends. From 1 December, the current SM18 access database will be closed and a new one “SM18-OWH outside normal hours” started from scratch. Requests, via EDH SM18-OWH, will have to be duly justified.   For further information, please contact Evelyne Delucinge.

  20. Using Picture and Text Schedules to Inform Children: Effects on Distress and Pain during Needle-Related Procedures in Nitrous Oxide Sedation

    Directory of Open Access Journals (Sweden)

    Merja Vantaa Benjaminsson

    2015-01-01

    Full Text Available During hospital visits, children often undergo examinations and treatments that may involve an experience of pain and distress that is also connected to the staff’s treatment. The United Nation’s Convention on the Rights of Persons with Disability advocates the use of Universal Design. One way of implementing this idea within paediatric nursing is to increase the use of pictorial supports, and the few studies that have been published show promising results. The aim of this study was to do a comparison between two groups of children in regard to the pre- and postconditions of implementing an intervention including staff instruction and the use of pictorial support. The support consisted of a visual schedule with pictures and text, used both preparatory to and during the hospital visit. One hundred children aged 5–15 (50 children during the preinterventional data collection and 50 children postinterventionally reported pain intensity and distress during needle-related procedures in nitrous oxide sedation. The results showed that the intervention had a positive effect in significantly lowering the level of preprocedural distress. The results showed that the pain intensity was also lowered however not reaching statistical significance. This confirms other positive research results on the use of visual supports within paediatric care, a topic that has to be further studied.

  1. Surgical scheduling: a lean approach to process improvement.

    Science.gov (United States)

    Simon, Ross William; Canacari, Elena G

    2014-01-01

    A large teaching hospital in the northeast United States had an inefficient, paper-based process for scheduling orthopedic surgery that caused delays and contributed to site/side discrepancies. The hospital's leaders formed a team with the goals of developing a safe, effective, patient-centered, timely, efficient, and accurate orthopedic scheduling process; smoothing the schedule so that block time was allocated more evenly; and ensuring correct site/side. Under the resulting process, real-time patient information is entered into a database during the patient's preoperative visit in the surgeon's office. The team found the new process reduced the occurrence of site/side discrepancies to zero, reduced instances of changing the sequence of orthopedic procedures by 70%, and increased patient satisfaction. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  2. Palliative care team visits. Qualitative study through participant observation.

    Science.gov (United States)

    Alfaya Góngora, Maria Del Mar; Bueno Pernias, Maria José; Hueso Montoro, César; Guardia Mancilla, Plácido; Montoya Juárez, Rafael; García Caro, Maria Paz

    2016-03-30

    To describe the clinical encounters that occur when a palliative care team provides patient care and the features that influence these encounters and indicate whether they are favorable or unfavorable depending on the expectations and feelings of the various participants. A qualitative case study conducted via participant observation. A total of 12 observations of the meetings of palliative care teams with patients and families in different settings (home, hospital and consultation room) were performed. The visits were follow-up or first visits, either scheduled or on demand. Content analysis of the observation was performed. The analysis showed the normal follow-up activity of the palliative care unit that was focused on controlling symptoms, sharing information and providing advice on therapeutic regimens and care. The environment appeared to condition the patients' expressions and the type of patient relationship. Favorable clinical encounter conditions included kindness and gratitude. Unfavorable conditions were deterioration caused by approaching death, unrealistic family objectives and limited resources. Home visits from basic palliative care teams play an important role in patient and family well-being. The visits seem to focus on controlling symptoms and are conditioned by available resources.

  3. Integrating mental health into adolescent annual visits: impact of previsit comprehensive screening on within-visit processes.

    Science.gov (United States)

    Gadomski, Anne M; Fothergill, Kate E; Larson, Susan; Wissow, Lawrence S; Winegrad, Heather; Nagykaldi, Zsolt J; Olson, Ardis L; Roter, Debra L

    2015-03-01

    To evaluate how a comprehensive, computerized, self-administered adolescent screener, the DartScreen, affects within-visit patient-doctor interactions such as data gathering, advice giving, counseling, and discussion of mental health issues. Patient-doctor interaction was compared between visits without screening and those with the DartScreen completed before the visit. Teens, aged 15-19 years scheduled for an annual visit, were recruited at one urban and one rural pediatric primary care clinic. The doctor acted as his/her own control, first using his/her usual routine for five to six adolescent annual visits. Then, the DartScreen was introduced for five visits where at the beginning of the visit, the doctor received a summary report of the screening results. All visits were audio recorded and analyzed using the Roter interaction analysis system. Doctor and teen dialogue and topics discussed were compared between the two groups. Seven midcareer doctors and 72 adolescents participated; 37 visits without DartScreen and 35 with DartScreen were audio recorded. The Roter interaction analysis system defined medically related data gathering (mean, 36.8 vs. 32.7 statements; p = .03) and counseling (mean, 36.8 vs. 32.7 statements; p = .01) decreased with DartScreen; however, doctor responsiveness and engagement improved with DartScreen (mean, 4.8 vs. 5.1 statements; p = .00). Teens completing the DartScreen offered more psychosocial information (mean, 18.5 vs. 10.6 statements; p = .01), and mental health was discussed more after the DartScreen (mean, 93.7 vs. 43.5 statements; p = .03). Discussion of somatic and substance abuse topics did not change. Doctors reported that screening improved visit organization and efficiency. Use of the screener increased discussion of mental health but not at the expense of other adolescent health topics. Copyright © 2015 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  4. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  5. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  6. Optimum radiotherapy schedule for uterine cervical cancer based-on the detailed information of dose fractionation and radiotherapy technique

    International Nuclear Information System (INIS)

    Cho, Jae Ho; Kim, Hyun Chang; Suh, Chang Ok

    2005-01-01

    The best dose-fractionation regimen of the definitive radiotherapy for cervix cancer remains to be clearly determined. It seems to be partially attributed to the complexity of the affecting factors and the lack of detailed information on external and intra-cavitary fractionation. To find optimal practice guidelines, our experiences of the combination of external beam radiotherapy (EBRT) and high-dose-rate intracavitary brachytherapy (HDR-ICBT) were reviewed with detailed information of the various treatment parameters obtained from a large cohort of women treated homogeneously at a single institute. The subjects were 743 cervical cancer patients (Stage IB 198, IIA 77, IIB 364, IIIA 7, IIIB 89 and IVA 8) treated by radiotherapy alone, between 1990 and 1996. A total external beam radiotherapy (EBRT) dose of 23.4 ∼ 59.4 Gy (Median 45.0) was delivered to the whole pelvis. High-dose-rate intracavitary brachytherapy (HDR-ICBT) was also performed using various fractionation schemes. A Midline block (MLB) was initiated after the delivery of 14.4∼ 43.2 Gy (Median 36.0) of EBRT in 495 patients, while in the other 248 patients EBRT could not be used due to slow tumor regression or the huge initial bulk of tumor. The point A, actual bladder and rectal doses were individually assessed in all patients. The biologically effective dose (BED) to the tumor (α / β = 10) and late-responding tissues (α /β = 3) for both EBRT and HDR-ICBT were calculated. The total BED values to point A, the actual bladder and rectal reference points were the summation of the EBRT and HDR-ICBT. In addition to all the details on dose-fractionation, the other factors (i.e. the overall treatment time, physicians preference) that can affect the schedule of the definitive radiotherapy were also thoroughly analyzed. The association between MD-BED Gy 3 and the risk of complication was assessed using serial multiple logistic regressions models. The associations between R-BED Gy 3 and rectal complications

  7. 29 CFR 1908.6 - Conduct of a visit.

    Science.gov (United States)

    2010-07-01

    ... identified during previous visits. A compliance inspection may in some cases be the basis for a visit limited... between onsite consultation and OSHA enforcement activity, explain the obligation to protect employees in... shall refer the request to the consultation manager for scheduling. In all cases in which the scope of...

  8. Dr. John Marburger visits DESY

    CERN Multimedia

    2003-01-01

    Dr. John Marburger, Director of the United States Office of Science and Technology Policy, visited the research center DESY in Hamburg. The American physicist wanted to inform himself about the status of the TESLA X-ray laser and the TESLA linear collider as well as the international collaboration at DESY (1/2 page).

  9. Stennis visits Lake Cormorant school

    Science.gov (United States)

    2010-01-01

    Alexis Harry, assistant director of Astro Camp at NASA's John C. Stennis Space Center, talks with students at Lake Cormorant (Miss.) Elementary School during a 'Living and Working in Space' presentation March 30. Stennis hosted the school presentation during a visit to the Oxford area. Harry, who also is a high school biology teacher in Slidell, La., spent time discussing space travel with students and answering questions they had about the experience, including queries about how astronauts eat, sleep and drink in space. The presentation was sponsored by the NASA Office of External Affairs and Education at Stennis. For more information about NASA education initiatives, visit: http://education.ssc.nasa.gov/.

  10. Well-child visits

    Science.gov (United States)

    ... Fluoride in diet Infant formulas Obesity in children Growth and development schedules: Infant -- newborn development Toddler development Preschooler development School-age child development Adolescent ...

  11. The visit is the medium

    Energy Technology Data Exchange (ETDEWEB)

    Haller, P [Electricite de France (EDF), 75 - Paris (France). Service de la Production Thermique

    1990-12-31

    In France the number of visitors to nuclear plants every year is comparable to the number of annual visitors to the Musee de l`Homme (approximately 300,000). Plant visits play an important role in the nuclear industry`s commnications and should be made as effective as possible. An appropriate discourse consisting of the following should be available: a warm reception; an open attitude; an ability to listen; and a willingness to inform. During the tour, the message received by the public should be positive. This message should consist of the benefits of electronuclear energy, and that the people working within the industry are ordinary people with concerns similar to the public. The words used during the visit should be chosen to avoid words with negative connotations. The use of measurement figures should be put in a comparative mode that can be understoood by the visitors. The site itself should be well signed with various amenities available. There are two stages to any visit: getting to the site and the actual site visit. Proper signage to the visitor center is important. Once there, two types of signage are important: directional and informationl. For the visit, have someone available to greet visitors. The visitor should receive an itinerary of the tour, with the end providing an opportunity for questions and answers, and refreshments. An adequate program for children should be available.

  12. Genetic Algorithm Combined with Gradient Information for Flexible Job-shop Scheduling Problem with Different Varieties and Small Batches

    Directory of Open Access Journals (Sweden)

    Chen Ming

    2017-01-01

    Full Text Available To solve the Flexible Job-shop Scheduling Problem (FJSP with different varieties and small batches, a modified meta-heuristic algorithm based on Genetic Algorithm (GA is proposed in which gene encoding is divided into process encoding and machine encoding, and according to the encoding mode, the machine gene fragment is connected with the process gene fragment and can be changed with the alteration of process genes. In order to get the global optimal solutions, the crossover and mutation operation of the process gene fragment and machine gene fragment are carried out respectively. In the initialization operation, the machines with shorter manufacturing time are more likely to be chosen to accelerate the convergence speed and then the tournament selection strategy is applied due to the minimum optimization objective. Meanwhile, a judgment condition of the crossover point quantity is introduced to speed up the population evolution and as an important interaction bridge between the current machine and alternative machines in the incidence matrix, a novel mutation operation of machine genes is proposed to achieve the replacement of manufacturing machines. The benchmark test shows the correctness of proposed algorithm and the case simulation proves the proposed algorithm has better performance compared with existing algorithms.

  13. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  14. Berliner Philarmoniker ATLAS visit

    CERN Multimedia

    ATLAS Collaboration

    2017-01-01

    The Berliner Philarmoniker in on tour through Europe. They stopped on June 27th in Geneva, for a concert at the Victoria Hall. An ATLAS visit was organised the morning after, lead by the ATLAS spokesperson Karl Jakobs (welcome and overview talk) and two ATLAS guides (AVC visit and 3D movie).

  15. Visiting Filmmakers: Why Bother?

    Science.gov (United States)

    MacDonald, Scott

    1995-01-01

    Argues that visits by independent filmmakers to campus are exciting and intellectually invigorating for students and teachers, and these visits add to the cultural energy of the college. Notes that a commitment to independent cinema challenges the assumptions and the economics of conventional cinema. Discusses how much independent filmmakers are…

  16. Arctic Visiting Speakers Series (AVS)

    Science.gov (United States)

    Fox, S. E.; Griswold, J.

    2011-12-01

    The Arctic Visiting Speakers (AVS) Series funds researchers and other arctic experts to travel and share their knowledge in communities where they might not otherwise connect. Speakers cover a wide range of arctic research topics and can address a variety of audiences including K-12 students, graduate and undergraduate students, and the general public. Host applications are accepted on an on-going basis, depending on funding availability. Applications need to be submitted at least 1 month prior to the expected tour dates. Interested hosts can choose speakers from an online Speakers Bureau or invite a speaker of their choice. Preference is given to individuals and organizations to host speakers that reach a broad audience and the general public. AVS tours are encouraged to span several days, allowing ample time for interactions with faculty, students, local media, and community members. Applications for both domestic and international visits will be considered. Applications for international visits should involve participation of more than one host organization and must include either a US-based speaker or a US-based organization. This is a small but important program that educates the public about Arctic issues. There have been 27 tours since 2007 that have impacted communities across the globe including: Gatineau, Quebec Canada; St. Petersburg, Russia; Piscataway, New Jersey; Cordova, Alaska; Nuuk, Greenland; Elizabethtown, Pennsylvania; Oslo, Norway; Inari, Finland; Borgarnes, Iceland; San Francisco, California and Wolcott, Vermont to name a few. Tours have included lectures to K-12 schools, college and university students, tribal organizations, Boy Scout troops, science center and museum patrons, and the general public. There are approximately 300 attendees enjoying each AVS tour, roughly 4100 people have been reached since 2007. The expectations for each tour are extremely manageable. Hosts must submit a schedule of events and a tour summary to be posted online

  17. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  18. Medical visits for chemotherapy and chemotherapy-induced neutropenia: a survey of the impact on patient time and activities

    Directory of Open Access Journals (Sweden)

    Moore Kelley

    2004-05-01

    Full Text Available Abstract Background Patients with cancer must make frequent visits to the clinic not only for chemotherapy but also for the management of treatment-related adverse effects. Neutropenia, the most common dose-limiting toxicity of myelosuppressive chemotherapy, has substantial clinical and economic consequences. Colony-stimulating factors such as filgrastim and pegfilgrastim can reduce the incidence of neutropenia, but the clinic visits for these treatments can disrupt patients' routines and activities. Methods We surveyed patients to assess how clinic visits for treatment with chemotherapy and the management of neutropenia affect their time and activities. Results The mean amounts of time affected by these visits ranged from approximately 109 hours (hospitalization for neutropenia and 8 hours (physician and chemotherapy to less than 3 hours (laboratory and treatment with filgrastim or pegfilgrastim. The visits for filgrastim or pegfilgrastim were comparable in length, but treatment with filgrastim requires several visits per chemotherapy cycle and treatment with pegfilgrastim requires only 1 visit. Conclusions This study provides useful information for future modelling of additional factors such as disease status and chemotherapy schedule and provides information that should be considered in managing chemotherapy-induced neutropenia.

  19. Integration of Building Information Modeling and Critical Path Method Schedules to Simulate the Impact of Temperature and Humidity at the Project Level

    Directory of Open Access Journals (Sweden)

    Yongwei Shan

    2014-07-01

    Full Text Available Steel construction activities are often undertaken in an environment with limited climate control. Both hot and cold temperatures can physically and psychologically affect construction workers, thus decreasing their productivity. Temperature and humidity are two factors that constantly exert forces on workers and influence their performance and efficiency. Previous studies have established a relationship between labor productivity and temperature and humidity. This research is built on the existing body of knowledge and develops a framework of integrating building information modeling (BIM with a lower level critical path method (CPM schedule to simulate the overall impact of temperature and humidity on a healthcare facility’s structural steel installation project in terms of total man hours required to build the project. This research effort utilized historical weather data of four cities across the U.S., with each city having workable seasons year-round and conducted a baseline assessment to test if various project starting dates and locations could significantly impact the project’s schedule performance. It was found that both varied project start dates and locations can significantly contribute to the difference in the man hours required to build the model project and that the project start date and location can have an interaction effect. This study contributes to the overall body of knowledge by providing a framework that can help practitioners better understand the overall impact of a productivity influencing factor at a project level, in order to facilitate better decision making.

  20. 75 FR 81110 - Schedule of Fees for Access to NOAA Environmental Data, Information, and Related Products and...

    Science.gov (United States)

    2010-12-27

    ... through the NESDIS. e-Commerce System (NeS) online store. Our ability to provide these data, information... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration 15 CFR Part 950 [Docket No... (NESDIS), National Oceanic and Atmospheric Administration (NOAA), Department of Commerce. ACTION: Final...

  1. The Home Care Crew Scheduling Problem

    DEFF Research Database (Denmark)

    Rasmussen, Matias Sevel; Justesen, Tor

    In the Home Care Crew Scheduling Problem (HCCSP) a staff of caretakers has to be assigned a number of visits, such that the total number of assigned visits is maximised. The visits have different locations and positions in time, and travelling time and time windows must be respected. The challenge...... when assigning visits to caretakers lies in the existence of soft constraints and indeed also in temporal dependencies between the starting times of visits. Most former approaches to solving the HCCSP involve the use of heuristic methods. Here we develop an exact branch-and-price algorithm that uses...... clustering of the visits based on the problem structure. The algorithm is tested on real-life problem instances and we obtain solutions that are better than current practice in all cases....

  2. The Home Care Crew Scheduling Problem:

    DEFF Research Database (Denmark)

    Rasmussen, Matias Sevel; Justesen, Tor; Dohn, Anders

    In the Home Care Crew Scheduling Problem a staff of caretakers has to be assigned a number of visits to patients' homes, such that the overall service level is maximised. The problem is a generalisation of the vehicle routing problem with time windows. Required travel time between visits and time...... preference constraints. The algorithm is tested both on real-life problem instances and on generated test instances inspired by realistic settings. The use of the specialised branching scheme on real-life problems is novel. The visit clustering decreases run times significantly, and only gives a loss...... windows of the visits must be respected. The challenge when assigning visits to caretakers lies in the existence of soft preference constraints and in temporal dependencies between the start times of visits. We model the problem as a set partitioning problem with side constraints and develop an exact...

  3. Visit by two Ministers

    CERN Multimedia

    2008-01-01

    Last December CERN received visits from two Ministers. Bulgaria’s Deputy Prime Minister and Minister of Science and Education, Daniel Vylchev, visited the CMS experiment in the company of the CMS Spokesman, T. Virdee, and several Bulgarian physicists. From left to right: J. Stamenov, M. Mateev, S. Stavrev, T. Virdee, V. Genchev, the Minister Daniel Vylchev, A. Hristova Vutsova, L. Litov and G. Soultanov. CERN Director-General, Robert Aymar, and Montenegro’s Minister of Education and Science, Slobodan Backović. On 18 December, Robert Aymar welcomed Bulgaria’s Deputy Prime Minister and Minister of Science and Education, Daniel Vylchev. A particular highlight of his visit was a tour of the CMS site, during which he met the many Bulgarian physicists working on the experiment. He also attended a presentation of the LHC Computing Grid and visited the Computer Centre. Bulgaria has been a CERN ...

  4. Unplanned Hospital Visits - National

    Data.gov (United States)

    U.S. Department of Health & Human Services — Unplanned Hospital Visits – national data. This data set includes national-level data for the hospital return days (or excess days in acute care) measures, the...

  5. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  6. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  7. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  8. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  9. Visit to China's ARJ21 Aircraft Manufacturing Facility

    National Research Council Canada - National Science Library

    Balut, Stephen J; McNicol, David L; Nelson, J. R; Harmon, Bruce R; Holder, Stephen G

    2008-01-01

    During a December 2007 visit to China to share information about civilian aircraft costs, a delegation from IDA visited the Shanghai Aircraft Manufacturing Facility where the commercial chinese ARJ21...

  10. Prospective Randomized Controlled Study on the Efficacy of Multimedia Informed Consent for Patients Scheduled to Undergo Green-Light High-Performance System Photoselective Vaporization of the Prostate

    Directory of Open Access Journals (Sweden)

    Dong Yeub Ham

    2016-04-01

    Full Text Available Purpose: The aim of this study was to evaluate the efficacy of a multimedia informed consent (IC presentation on the understanding and satisfaction of patients who were scheduled to receive 120-W green-light high-performance system photoselective vaporization of the prostate (HPS-PVP. Materials and Methods: A multimedia IC (M-IC presentation for HPS-PVP was developed. Forty men with benign prostatic hyperplasia who were scheduled to undergo HPS-PVP were prospectively randomized to a conventional written IC group (W-IC group, n=20 or the M-IC group (n=20. The allocated IC was obtained by one certified urologist, followed by a 15-question test (maximum score, 15 to evaluate objective understanding, and questionnaires on subjective understanding (range, 0∼10 and satisfaction (range, 0∼10 using a visual analogue scale. Results: Demographic characteristics, including age and the highest level of education, did not significantly differ between the two groups. No significant differences were found in scores reflecting the objective understanding of HPS-PVP (9.9±2.3 vs. 10.6±2.8, p=0.332 or in subjective understanding scores (7.5±2.1 vs. 8.6±1.7, p=0.122; however, the M-IC group showed higher satisfaction scores than the W-IC group (7.4±1.7 vs. 8.4±1.5, p=0.033. After adjusting for age and educational level, the M-IC group still had significantly higher satisfaction scores. Conclusions: M-IC did not enhance the objective knowledge of patients regarding this surgical procedure. However, it improved the satisfaction of patients with the IC process itself.

  11. Prospective Randomized Controlled Study on the Efficacy of Multimedia Informed Consent for Patients Scheduled to Undergo Green-Light High-Performance System Photoselective Vaporization of the Prostate

    Science.gov (United States)

    Ham, Dong Yeub; Choi, Woo Suk; Song, Sang Hoon; Ahn, Young-Joon; Park, Hyoung Keun; Kim, Hyeong Gon

    2016-01-01

    Purpose The aim of this study was to evaluate the efficacy of a multimedia informed consent (IC) presentation on the understanding and satisfaction of patients who were scheduled to receive 120-W green-light high-performance system photoselective vaporization of the prostate (HPS-PVP). Materials and Methods A multimedia IC (M-IC) presentation for HPS-PVP was developed. Forty men with benign prostatic hyperplasia who were scheduled to undergo HPS-PVP were prospectively randomized to a conventional written IC group (W-IC group, n=20) or the M-IC group (n=20). The allocated IC was obtained by one certified urologist, followed by a 15-question test (maximum score, 15) to evaluate objective understanding, and questionnaires on subjective understanding (range, 0~10) and satisfaction (range, 0~10) using a visual analogue scale. Results Demographic characteristics, including age and the highest level of education, did not significantly differ between the two groups. No significant differences were found in scores reflecting the objective understanding of HPS-PVP (9.9±2.3 vs. 10.6±2.8, p=0.332) or in subjective understanding scores (7.5±2.1 vs. 8.6±1.7, p=0.122); however, the M-IC group showed higher satisfaction scores than the W-IC group (7.4±1.7 vs. 8.4±1.5, p=0.033). After adjusting for age and educational level, the M-IC group still had significantly higher satisfaction scores. Conclusions M-IC did not enhance the objective knowledge of patients regarding this surgical procedure. However, it improved the satisfaction of patients with the IC process itself. PMID:27169129

  12. NOTE FROM VISITS SERVICE

    CERN Multimedia

    ETT Division; Division ETT; Service des visites

    2000-01-01

    The Visit Service noticed that for many years countries such as Great Britain, Germany, Spain, Portugal, the Netherlands and the Scandinavian countries visit CERN less than other member countries and that is due to the high price of the trip for the students. To improve the situation the Visit Service plans to create a network of 'Family-Accommodation' ('Famille-Accueil') in Geneva and in France nearbywith the aim to facilitate the trip to foreign students especially from the more distant member countries and to encourage them to visit our unique laboratory. We expect this exchange to be an interesting experience for both the students and the welcoming family ('famille d'accueil'). If you are interested in participating in this family network, please fill in the questionnaire below. The questionnaire is to be returned to the Visit Service, Mrs Christine Fromm, e-mail Christine.Fromm@cern.ch.Name: First name: CERN address: E-mail: Portable phone number: Home address...

  13. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  14. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  15. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  16. Fathers and the well-child visit.

    Science.gov (United States)

    Garfield, Craig F; Isacco, Anthony

    2006-04-01

    skills, which resulted in lower involvement levels. Also mentioned were health care system barriers such as inconvenient office hours and a lack of access to their child's records. Despite the presence of several barriers that seem to prevent fathers from attending WCVs, many fathers (20 of 32;63%) mentioned "situational flexibility," which enables them to overcome the stated barriers and attend doctor visits. For example, some fathers viewed the seriousness of the visit such as "ear surgery" as a reason to rearrange their schedules and attend a doctor visit with their child. The majority of fathers from our sample have attended a WCV, and most have been to their child's doctor in the past year; WCVs and doctor appointments are ways in which fathers are involved in their child's health care. Fathers detailed specific reasons for why they attend WCVs, such as to support their child, ask questions, express concerns, and gather information firsthand. The fathers reported more positive than negative experiences with the health care staff, and, overall, they are satisfied with their experiences with the health care system. Reasons for satisfaction include feeling as though their questions had been dealt with seriously and answered appropriately. However, the fathers in our study did report a variety of barriers to health care involvement, including conflicting work schedules, a lack of confidence in their parental role, and health care system barriers. Professionals who care for children and families need to explore creative ways to engage fathers in the structured health care of their children. For example, pediatricians can stress the benefits of both parents being involved in their child's health care while reframing the importance of WCVs. Understanding that many fathers have situational flexibility when it comes to health care encounters may encourage physicians to suggest more actively that fathers attend WCVs. Pediatricians can also support existing public policies

  17. Dutch ministerial visit

    CERN Multimedia

    2007-01-01

    Dutch Minister of Education, Culture and Science R. Plasterk (third from left) in the ATLAS cavern with NIKHEF Director F. Linde, CERN Chief Scientific Officer J. Engelen, Ambassador J. van Eenennaam, ATLAS Collaboration Spokesperson P. Jenni, Mission Representative G. Vrielink and ATLAS Magnet Project Leader H. ten Kate.Minister of Education, Culture and Science from the Kingdom of the Netherlands, Ronald Plasterk, visited CERN on 25th October. With Jos Engelen, CERN Scientific Director, as his guide he visited Point 1 of the LHC tunnel and ATLAS, where Nikhef (the national institute for subatomic physics, a Dutch government and university collaboration) constructed all 96 of the largest muon drift chambers in the barrel as well as parts of the magnet system, the inner detector, the DAQ and triggering. Overall the Netherlands contribute 4.5% to the annual CERN budget and the minister’s visit celebrated the contributions of the 79 ...

  18. The Use of the Patient Reported Outcomes Measurement Information System and the RAND VSQ9 to Measure the Quality of Life and Visit-Specific Satisfaction of Pregnant Patients Under Chiropractic Care Utilizing the Webster Technique.

    Science.gov (United States)

    Alcantara, Joel; Nazarenko, Andrea Lamont; Ohm, Jeanne; Alcantara, Junjoe

    2018-01-01

    To quantify the quality of life (QoL) and visit-specific satisfaction of pregnant women. A prospective cohort within a practice-based research network (PBRN). Setting/Locations: Individual chiropractic offices. Pregnant women (age ≥18 years) attending chiropractic care. Chiropractic care (i.e., The Webster Technique, spinal adjustments, and adjunctive therapies). The RAND VSQ9 to measure visit-specific satisfaction and the Patient Reported Outcomes Measurement Information System (PROMIS ® )-29 to measure QoL. A convenience sample of 343 pregnant patients (average age = 30.96 years) comprised their study population. They were highly educated with 75% attaining a 2-year associate's degree or higher. The pregnant patients presented for chiropractic care with a mean week of gestation of 25.67 weeks (median = 28 weeks; range = 0-42 weeks) and parity (i.e., the number of live births) of 0.92 live births (median = 1; range = 0-6). From baseline (i.e., at study entrance with minimum first visit) and comparative (i.e., following a course of chiropractic care), the VSQ9 measurements revealed increasingly high satisfaction on the part of the subjects (i.e., the mean difference of baseline minus comparative measures = -0.7322; p < 0.005). The median number of visits (i.e., visits attended) at baseline and comparative measures was 1.00 (standard deviation [SD] = 22.69) and 3.30 (SD = 22.71), respectively. Across outcomes, QoL improved from baseline to comparative measurement after holding constant for visit number and time lapse, trimester of pregnancy, and care provider type. There was a reduction in mean T scores associated with fatigue (p < 0.05), pain interference (p < 0.05), sleep disturbance (p < 0.05), and an improvement in satisfaction with social roles (p < 0.05). A significant decrease was also found with pain interference (p < 0.05). No evidence was found that anxiety (p = 0.1404) or depression (p = 0

  19. Optimal procedures for home visits — A case study

    Science.gov (United States)

    Alves, Filipe; Fernandes, Florbela P.; Pereira, Ana I.; Fernandes, Adília

    2017-07-01

    In Portugal the population is ageing. Therefore, the provision of health care at patients' home is becoming an important social and health area; this health service is provided by professional teams (usually composed by nurses) of the Health Centers. Nowadays, the scheduling of the visits is made manually. The proposal of this work is to do the scheduling automatically in order to minimize the overall time spent by the professional teams in the visiting activity. In this work the genetic algorithm was used to solve the optimization problem. Some numerical results are presented.

  20. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  1. Sick-visit immunizations and delayed well-baby visits.

    Science.gov (United States)

    Robison, Steve G

    2013-07-01

    Giving recommended immunizations during sick visits for minor and acute illness such as acute otitis media has long been an American Academy of Pediatrics/Advisory Committee on Immunization Practice recommendation. An addition to the American Academy of Pediatrics policy in 2010 advised considering whether giving immunizations at the sick visit would discourage making up missed well-baby visits. This study quantifies the potential tradeoff between sick-visit immunizations and well-baby visits. This study was a retrospective cohort analysis with a case-control component of sick visits for acute otitis media that supplanted normal well-baby visits at age 2, 4, or 6 months. Infants were stratified for sick-visit immunization, no sick-visit immunization but quick makeup well-baby visits, or no sick-visit immunizations or quick makeup visits. Immunization rates and well-baby visit rates were assessed through 24 months of age. For 1060 study cases, no significant difference was detected in immunization rates or well-baby visits through 24 months of age between those with or without sick-visit immunizations. Thirty-nine percent of infants without a sick-visit shot failed to return for a quick makeup well-baby visit; this delayed group was significantly less likely to be up-to-date for immunizations (relative risk: 0.66) and had fewer well-baby visits (mean: 3.8) from 2 through 24 months of age compared with those with sick-visit shots (mean: 4.7). The substantial risk that infants will not return for a timely makeup well-baby visit after a sick visit should be included in any consideration of whether to delay immunizations.

  2. Auger Physicists visit CMS

    CERN Multimedia

    Hoch, Michael

    2012-01-01

    Visit at CERN P5 CMS in the experimental cavern Alan Watson, Auger Spokesperson Emeritus, University of Leeds; Jim Cronin, Nobel Laureate, Auger Spokesperson Emeritus, University of Chicago; Jim Virdee, CMS Former Spokesperson, Imperial College; Jim Matthews, Auger Co-Spokesperson, Louisiana State University

  3. Thomas Kibble visits CERN

    CERN Multimedia

    Rosaria Marraffino

    2014-01-01

    Emeritus Professor Sir Thomas W.B. Kibble, from Imperial College London visited LHC for the first time last week and delivered a colloquium on the genesis of electroweak unification and the Brout-Englert-Higgs mechanism.   From left to right: Jim Virdee, Tiziano Camporesi, Tom Kibble and Austin Ball on the visit to CMS. On his way back from Trieste, where he received the Abdus Salam International Centre for Theoretical Physics' Dirac Medal, Tom Kibble stopped by CERN for his first visit to the LHC. Kibble had a standing invitation from Jim Virdee, former CMS spokesperson, who is also a researcher from Imperial College London. Peter Jenni (left) and Tom Kibble tour the ATLAS detector. (Image: Erwan Bertrand) Kibble made the trip to CERN a family outing and brought along 14 relatives,  including his children and grandchildren. He visited the ATLAS detector with Peter Jenni, its former spokesperson, on Friday 10 October. In the afternoon, Kibble delivered a colloquium in the...

  4. Preventing infections when visiting

    Science.gov (United States)

    ... need.) When you visit a patient in the hospital, keep your hands away from your face. Cough or sneeze into a tissue or into the crease of your elbow, not into the air. References Calfee DP. Prevention and control of health care-associated infections. In: Goldman L, Schafer AI, eds. Goldman-Cecil ...

  5. Price Transparency in Primary Care: Can Patients Learn About Costs When Scheduling an Appointment?

    Science.gov (United States)

    Saloner, Brendan; Cope, Lisa Clemans; Hempstead, Katherine; Rhodes, Karin V; Polsky, Daniel; Kenney, Genevieve M

    2017-07-01

    Cost-sharing in health insurance plans creates incentives for patients to shop for lower prices, but it is unknown what price information patients can obtain when scheduling office visits. To determine whether new patients can obtain price information for a primary care visit and identify variation across insurance types, offices, and geographic areas. Simulated patient methodology in which trained interviewers posed as non-elderly adults seeking new patient primary care appointments. Caller insurance type (employer-sponsored insurance [ESI], Marketplace, or uninsured) and plan were experimentally manipulated. Callers who were offered a visit asked for price information. Unadjusted means and regression-adjusted differences by insurance, office types, and geography were calculated. Calls to a representative sample of primary care offices in ten states in 2014: Arkansas, Georgia, Iowa, Illinois, Massachusetts, Montana, New Jersey, Oregon, Pennsylvania, and Texas (N = 7865). Callers recorded whether they were able to obtain a price. If not, they recorded whether they were referred to other sources for price information. Overall, 61.8% of callers with ESI were able to obtain a price, versus 89.2% of uninsured and 47.3% of Marketplace callers (P information was also more readily available in small offices and in counties with high uninsured rates. Among callers not receiving a price, 72.1% of callers with ESI were referred to other sources (billing office or insurance company), versus 25.8% of uninsured and 50.9% of Marketplace callers (P information is often unavailable for privately insured patients seeking primary care visits at the time a visit is scheduled.

  6. One-visit endodontics.

    Science.gov (United States)

    Ashkenaz, P J

    1984-10-01

    I would like to conclude with some personal observations and comments on the use of single-visit endodontics in private practice based on my 12 years of experience utilizing this procedure. I cannot stress in strong enough terms that one-visit endodontics should not be undertaken by the novice. As an evolutionary philosophy of treatment, its use grows out of a full understanding of fundamental endodontic principles by the experienced practitioner. It is only after considering all of the indications and contraindications in each case on an individual basis, that a decision should be made as to whether or not it can be completed in a single visit. However, it is also important for the practitioner to have a clinical sense of what can be accomplished once the rubber dam has been placed and work commenced on the tooth. I submit to you that this very important clinical sense can be gained only after many years of clinical experience. Therefore, the endodontic competence of the practicing dentist becomes the overriding factor in determining the outcome of any one particular case. This is not to say that only a specialized few can and should perform this procedure. However, it does mean that a high degree of clinical skill is necessary to perform it in a successful manner. The performance of better endodontics in multiple visits will ensure success in single visits. Therefore, it is incumbent upon the individual practitioner to objectively evaluate his or her endodontic skills. The clinician should critically evaluate every aspect of his or her endodontic practice by determining the incidences of biomechanical errors such as ledging, perforations, overinstrumentation, broken instruments, interappointment flare-ups, and failures. For only after evaluating these areas will the clinician have an indication as to his or her level of endodontic skill and whether or not future study and practice need be done in one or more specific aspects of endodontic practice. Once a high

  7. Injury patterns in children with frequent emergency department visits

    DEFF Research Database (Denmark)

    Laursen, B

    2006-01-01

    -14 years. Information on all ED visits was obtained from the Danish National Patient Registry. Injury type, place of accident, injury mechanism, admission, and distance to ED were compared between children with frequent ED visits (five or more during the three years) and children with only one visit...... less severe injuries and more dislocations, sprains, and strains....

  8. Belgian Firms Visit CERN

    CERN Multimedia

    2001-01-01

    Fifteen Belgian firms visited CERN last 2 and 3 April to present their know-how. Industrial sectors ranging from precision machining to electrical engineering and electronics were represented. And for the first time, companies from the Flemish and Brussels regions of the country joined their Walloon compatriots, who have come to CERN before. The visit was organised by Mr J.-M. Warêgne, economic and commercial attaché at the Belgian permanent mission for the French-speaking region, Mr J. Van de Vondel, his opposite number for the Flemish region, and Mrs E. Solowianiuk, economic and commercial counsellor at the Belgian permanent mission for the Brussels-Capital region.

  9. German visits to CERN

    CERN Multimedia

    2007-01-01

    State secretary to Germany's Federal Ministry of Education and Research, Frieder Meyer-Krahmer, with CERN's Director-General Robert Aymar.On 21 February, Professor Frieder Meyer-Krahmer, State Secretary to Germany's Federal Ministry of Education and Research, came to CERN. He visited the ALICE and ATLAS experiments and the computing centre before meeting the CERN's Director-General, some German physicists and members of the top management. The Minister of Science, Research and the Arts of the Baden-Württemberg regional government, Peter Frankenberg, and CERN's Director-General, Robert Aymar, signing an agreement on education. In the background: Sigurd Lettow, CERN's Director of Finance and Human Resources, and Karl-Heinz Meisel, Rector of the Fachhochschule Karlsruhe. The Minister of Science, Research and the Arts of the Baden-Württemberg regional government, Prof. Peter Frankenberg, visited CERN on 23 February. He was accompanied by the Rector of the Fachhochschule Karlsruhe, Prof. Karl-Heinz Meisel, and b...

  10. Romanian President Visits CERN

    CERN Multimedia

    2001-01-01

    Director General Luciano Maiani watches as Romanian President Ion Iliescu signs the CERN guest book. On Friday the 12th of October, Romanian President Ion Iliescu arrived at CERN and was warmly greeted by Director General Luciano Maiani at the steps of building 500. After initial greetings and a general presentation of the laboratory, President Iliescu and his entourage embarked on a whistle stop tour of the CERN facilities. They visited the CMS magnet assembly hall and civil engineering work where presentations were made by CMS spokesperson Michel Della Negra and the ATLAS Tile Calorimeter where the president was introduced to Romanian physicists working here at CERN. Michel Della Negra explains some of the general principles behind CMS to President Iliescu during his visit last week. The Romanian teams working on CERN projects make very visible contributions, for example to the construction of the ATLAS experiment and to the preparation of its eventual scientific exploitation. 'Those of us on the ATLAS ...

  11. Indian President visits CERN

    CERN Multimedia

    Katarina Anthony

    2011-01-01

    On 1 October, her Excellency Mrs Pratibha Devisingh Patil, President of India, picked CERN as the first stop on her official state visit to Switzerland. Accompanied by a host of Indian journalists, a security team, and a group of presidential delegates, the president left quite an impression when she visited CERN’s Point 2!   Upon arrival, Pratibha Patil was greeted by CERN Director General Rolf Heuer, as well as senior Indian scientists working at CERN, and various department directors. After a quick overview of the Organization, Rolf Heuer and the President addressed India’s future collaboration with CERN. India is currently an Observer State of the Organization, and is considering becoming an Associate Member State. A short stop in LHC operations gave Steve Myers and the Accelerator team the opportunity to take the President on a tour through the LHC tunnel. From there, ALICE’s Tapan Nayak and Spokesperson Paolo Giubellino took Pratibha Patil to the experiment&am...

  12. A royal visit

    CERN Multimedia

    Katarina Anthony

    2014-01-01

    On Wednesday, 21 May, CERN received His Majesty Philippe, King of the Belgians, for a full-day visit of the Laboratory.   From left to right: Tiziano Camporesi, CMS Spokesperson; François Englert, Nobel Prize in Physics 2013; Rolf Heuer, CERN Director-General; His Majesty Philippe, King of the Belgians; Philippe Courard, Belgium's State Secretary for Scientific Policy and Walter Van Doninck, CERN Council Vice-President. Director-General Rolf Heuer welcomed King Philippe to CERN at Point 5 (Cessy). This was to be no small visit, with His Majesty accompanied by a host of diplomats, prominent Belgian physicists - including François Englert - and even members of Belgium's press corps. After quick introductions, the morning began with a tour of the CMS underground experimental area and the LHC tunnel at Point 5, guided by the CMS Collaboration Spokesperson, Tiziano Camporesi, and the Director for Accelerators and Technology, Frédérick Bord...

  13. UK Minister enthusiastic after visit to CERN

    CERN Multimedia

    2008-01-01

    ON Tuesday 5 August the UK Secretary of State for Innovation, Universities and Skills, John Denham, came to CERN. The UK continues its strong links with CERN.The Minister was welcomed on arrival at CERN by Robert Aymar, the Director-General, and senior British scientists. Following a short presentation, he began a comprehensive tour of the Laboratory with a visit to both the LHC at point 5 and the CMS experiment. After lunch the Minister’s busy schedule continued, completing his overview of the main areas of UK participation at CERN. As soon as he had signed the guest book, he was whisked off to visit the LHCb experiment, the LHC computing grid project (LCG) and the ATLAS control room. However, the last item on his itinerary was perhaps the most illuminating. Meeting a diverse group of British scientists, from technical and summer students to staff members with more than 30 years of experience, the Minister had the opportunity...

  14. 5 CFR 532.207 - Time schedule for wage surveys.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Time schedule for wage surveys. 532.207... PREVAILING RATE SYSTEMS Prevailing Rate Determinations § 532.207 Time schedule for wage surveys. (a) Wage... and the collection of wage data by visits to establishments. (c) A wage-change survey shall be made...

  15. The Liner Shipping Routing and Scheduling Problem Under Environmental Considerations

    DEFF Research Database (Denmark)

    Dithmer, Philip; Reinhardt, Line Blander; Kontovas, Christos

    2017-01-01

    This paper deals with the Liner Shipping Routing and Scheduling Problem (LSRSP), which consists of designing the time schedule for a vessel to visit a fixed set of ports while minimizing costs. We extend the classical problem to include the external cost of ship air emissions and we present some...

  16. Supriya Jindal visits school

    Science.gov (United States)

    2009-01-01

    Louisiana First Lady Supriya Jindal (left) speaks to teachers and students at A.P. Tureaud Elementary School in New Orleans during a March 19 visit. At the school, Jindal was joined by retired NASA astronaut Sally Ride, the first American woman in space. Ride was a crew member on space shuttle Challenger during its STS-7 mission in 1983. She also was a crew member of space shuttle discovery on the STS-41 mission in 1984.

  17. Visiting 'J' Village

    International Nuclear Information System (INIS)

    Tomek, J.

    2012-01-01

    Prior to entrance into twenty km evacuated zone of Fukushima Daiichi, there is so called 'J' Village. Until now, it was a centre used by the Japan football representation. Today, employees working at this locality as well as all visits pass this village. They can only enter the evacuated area in a bus, equipped with an electronic dosimeter, with a face mask, gloves, and shoe covers. (author)

  18. Spanish Visit to CERN

    CERN Multimedia

    2002-01-01

    Last week CERN was visited by the Spanish Minister of Science and Technology, Josep Piqué i Camps. While here, he was able to visit the ATLAS assembly hall where many items of equipment are being built in collaboration with Spanish academic institutions or firms. These include the vacuum vessels for the ATLAS barrel toroid magnets supplied by the Spanish firm Felguera Construcciones Mechanics. Similarly, the Universidad Autónoma de Madrid is participating in the manufacture of the electromagnetic calorimeter endcaps, while the Barcelona Institute for High Energy Physics and the Valencia IFIC (Instituto de Física Corpuscular) are highly involved in the production of barrel modules for the tile calorimeter. The delegation, accompanied by Spanish scientists at CERN, also visited the LHC superconducting magnet test hall (photo). From left to right: Felix Rodriguez Mateos of CERN LHC Division, Josep Piqué i Camps, Spanish Minister of Science and Technology, César Dopazo, Director-General of CIEMAT (Spanish ...

  19. Serbian President visits CERN

    CERN Multimedia

    Katarina Anthony

    2012-01-01

    On Tuesday 10 January, Serbian President Boris Tadić visited the Laboratory to sign the Agreement of granting the status of Associate Membership as the pre-stage to full Membership of CERN.    Before the signing ceremony, the President, welcomed by Director-General Rolf Heuer at CERN’s Point 5, took the opportunity to visit CERN. After a general introduction, the President took advantage of the shutdown to visit the LHC’s underground caverns. Leading the President through their respective experiments were spokespersons Fabiola Gianotti (ATLAS) and Joe Incandela (CMS).  After a morning of tours, President Tadić and Rolf Heuer signed the Agreement. Serbia’s status as an Associate Member as pre-stage to full Membership is expected to come into force following ratification by the Serbian Parliament. After a maximum period of five years, the CERN Council will decide on the admission of Serbia to full Membership. This new agreement continues Serbia&a...

  20. A boost to visits

    CERN Multimedia

    2005-01-01

    Several guides were rewarded by CERN's Director-General and Secretary-General for their contributions in 2004. Left to right: Géraldine Chuste, the Director-General Robert Aymar, Klaus Batzner, Philippe Moret, Joanna Weng, Alberto Ribon, Head of the Visits Service, Emma Sanders, and the Secretary-General, Maximilian Metzger. Three other guides not in the photograph, Antonio Francano, Christoph Ilgner and Tzanko Spassoff, were also rewarded for their contributions. As every year, the CERN Visits Service has paid tribute to its guides, all of whom are volunteers and devote some of their time to showing people around their Laboratory. The guides were invited to a get-together in Microcosm during which the Director-General, Robert Aymar, expressed his special gratitude for their efforts and presented awards to the most dedicated among them. He encouraged members of the Laboratory to become guides and underlined that 2004 had been an exceptional year for visits, which had risen by 15% to almost 22,000. Including ...

  1. EUCYS prizewinner visits CERN

    CERN Multimedia

    Jennifer Toes

    2016-01-01

    Young Turkish student Baris Volkan Gürses visited CERN from 4 to 8 July after winning the prize in the 2015 European Contest for Young Scientists (EUCYS).    Baris Volkan Gürses, EUCYS prizewinner, visiting the Microcosm. After winning both regional and national competitions in Turkey, 18-year-old student Baris Volkan Gürses competed against 169 young scientists and was awarded a visit to CERN by EIROforum for his physics project in EUCYS 2015. His project, entitled “Generation of artificial gravity by using electrostatic force for prevention of muscle atrophy and osteoporosis occurring in gravity-free environments”, focused on the design of a mechanism to help with the impact of spaceflight on the human body. “My objective was to eliminate the negative effects of a gravity-free environment on astronauts who stay in space for longer periods of time, like in the International Space Station,” explained Volkan. &...

  2. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  3. The CERN Visits Service proposes: Lab Visits for CERN People

    CERN Multimedia

    2001-01-01

    The CMS assembly hall at point 5 - one of the new Visits Service itineraries. Discover the new visits itineraries of your laboratory with the Visits Service! The recently completed visitors platform in the CMS detector assembly hall at point 5, first of a series of new visit tours, will be the destination for special summer visits organised by the Visits Service for CERN people. Each week the Visits Service will reserve a slot to take CERN people to visit the CMS assembly hall and get first hand experience of the magnitude of the LHC endeavour. Tours will be shorter than the public visit programme, and will include a short introduction in the bus along with a guided tour of the CMS visitor platform. Visits will start at 3.30 pm from the visits meeting point in the reception of building 33, and the bus will be back at reception at 5 pm. Up to 24 people can take part in each visit. The calendar for the coming weeks is: Friday 27 July in French Thursday 2 August in English Wednesday 8 August in French Booking...

  4. [A Study on the Number of Offices for Home-Visit/Outpatient Day Long-Term Care in Noto Area, Based on Estimated Population - Analysis Using the Geographic Information System].

    Science.gov (United States)

    Itatani, Tomoya; Horiike, Ryo; Nakai, Hisao; Kyota, Kaoru; Tsukasaki, Keiko

    2018-03-01

    There has been a noticeable population decline in the Noto area. The Ministry of Land, Infrastructure, Transport and Tourism has determined the population size necessary for the establishment of daily living-related service businesses and, if the population falls below this, there is a possibility of businesses withdrawing from the area. In this research, we examine the number of home visit and daycare businesses established in the Noto area in 2025, using the geographic information system (GIS). The number of sites of businesses established was calculated using data published by the National Institute of Population and Social Security Research, and the Ministry of Land, Infrastructure, Transport and Tourism. Next, I depicted a buffer with a radius of 15 km from the establishment and confirmed the blank area of the service. Under the condition that the placement of sites is 80%, almost all the municipalities have exceeded the number of home visit care facilities and the number of daycare facilities. In the buffer analysis, blank areas were found in the north. To maintain these services, efforts by groups other than profit-oriented organizations are necessary, especially in the north of Noto. Route analysis by GIS and the consideration of population distribution and location of business establishment will be needed.

  5. Emergency presurgical visit

    Directory of Open Access Journals (Sweden)

    Alfredo Castro Díaz

    2009-07-01

    Full Text Available The objective has been to create a Protocol of Structured Presurgical Visit applicable to the patients who are undergoing an emergency surgery, to provide the user and his family all the necessary cares on the basis of those nursing diagnosis that prevail in all the cases of surgical emergency interventions. The used method has been an analysis of the emergency surgical interventions more prevalent from February 2007 until October 2008 in our area (a regional hospital, and statistic of those nursing diagnosis that more frequently appeared in these interventions, the previous moment to the intervention and in addition common to all of them. The results were the following ones: the more frequent emergency operations were: Caesarean, ginecological curettage, laparotomy, help in risk childbirth, orthopaedic surgery and appendectomy. The more frequent nursing diagnosis in all the emergency operations at the previous moment of the intervention were: risk of falls, pain, anxiety, deficit of knowledge, risk of infection, movement stress syndrome, risk of hemorrhage, cutaneous integrity deterioration. The conclusion is that users present at the previous moment to an emergency operation several problems, which force to the emergency surgical ward nurse to the introduction of the nursing methodology, in order to identify the problems, to mark results and to indicate the interventions to achieve those results, besides in a humanitarian way and with quality. This can be obtained by performing a Structured Emergency Presurgical Visit.

  6. Steven Weinberg visits CERN

    CERN Multimedia

    2009-01-01

    Steven Weinberg visiting the ATLAS cavern accompanied by Peter JenniIt was no surprise that the CERN audience arrived early in the Globe of Science and Innovation for the colloquium on 7 July. Nobel laureate Steven Weinberg is one of the major contributors to the Standard Model of particle physics. He received the Nobel Prize for Physics in 1979 for his work on the unified theory of the electromagnetic and weak interactions, one of the essential pillars of the Standard Model. After lunch at CERN and a visit to ATLAS, Weinberg gave a colloquium on "The Quantum Theory of Fields: Effective or Fundamental" to a packed audience. In his talk, he looked at how the use of quantum field theory in particle physics has fluctuated in popularity since Paul Dirac first introduced the approach to describe the interaction of particles with electromagnetic fields in the late 1920s. In particular, he posed the question: Is quantum field theory fundamental or does it a...

  7. Kofi Annan visits CERN

    CERN Multimedia

    Katarina Anthony

    2011-01-01

    On Tuesday 13 September, former Secretary-General of the United Nations and Nobel Peace Laureate Kofi Annan paid a visit to CERN.   Arriving in the early afternoon, Kofi Annan and his family were greeted by Director-General Rolf Heuer on the steps of Building 500. After a quick introduction to the Laboratory, they were whisked off to SM18 for a tour of the LHC’s superconducting magnet test hall, guided by Technology Department Head Frédérick Bordry. After a light lunch in Restaurant 2, Kofi Annan added his signature to CERN’s Guest Book. He is the second UN Secretary-General to add their name to CERN’s roster; his successor Ban Ki-Moon’s visited CERN in 2008.  Kofi Annan was then guided by spokesperson Fabiola Gianotti on a tour of ATLAS’s Visitor Centre. This was an opportunity for some of the younger members of the ATLAS collaboration to meet the former Secretary-General and to answer his questions about the exper...

  8. The CERN Visits Service proposes: Lab Visits for CERN People

    CERN Document Server

    2001-01-01

    The CMS assembly hall at point 5 - one of the new Visits Service itineraries. Discover the new visits itineraries of your laboratory with the Visits Service! The recently completed visitors platform in the CMS detector assembly hall at point 5, first of a series of new visit itineraries, will be the destination for special summer visits organised by the Visits Service for CERN people. Each week the Visits Service will reserve a slot to take CERN people to visit the CMS assembly hall and get first hand experience of the magnitude of the LHC endeavour. Tours will be shorter than the public visit programme, and will include a short introduction in the bus along with a guided tour of the CMS visitor platform. Visits will start at 3.30 pm from the reception of building 33, and the bus will be back at reception at 5 pm. Up to 22 people can take part in each visit. The calendar for the coming weeks is: Wednesday 15 August in English Wednesday 22 August in French Wednesday 29 August in English Bookings should be m...

  9. The CERN Visits Service proposes: Lab Visits for CERN People

    CERN Document Server

    2001-01-01

    The CMS assembly hall at point 5 - one of the new Visits Service itineraries. Discover the new visits itineraries of your laboratory with the Visits Service! The recently completed visitors platform in the CMS detector assembly hall at point 5, first of a series of new visit itineraries, will be the destination for special summer visits organised by the Visits Service for CERN people. Each week the Visits Service will reserve a slot to take CERN people to visit the CMS assembly hall and get first hand experience of the magnitude of the LHC endeavour. Tours will be shorter than the public visit programme, and will include a short introduction in the bus along with a guided tour of the CMS visitor platform. Visits will start at 3.30 pm from the reception of building 33, and the bus will be back at reception at 5 pm. Up to 22 people can take part in each visit. The calendar for the coming weeks is: Wednesday 8 August in French Wednesday 15 August in English Wednesday 22 August in French Bookings should be mad...

  10. The CERN Visits Service proposes: Lab Visits for CERN People

    CERN Document Server

    2001-01-01

    The CMS assembly hall at point 5 - one of the new Visits Service itineraries. Discover the new visits itineraries of your laboratory with the Visits Service! The recently completed visitors platform in the CMS detector assembly hall at point 5, first of a series of new visit itineraries, will be the destination for special summer visits organised by the Visits Service for CERN people. Each week the Visits Service will reserve a slot to take CERN people to visit the CMS assembly hall and get first hand experience of the magnitude of the LHC endeavour. Tours will be shorter than the public visit programme, and will include a short introduction in the bus along with a guided tour of the CMS visitor platform. Visits will start at 3.30 pm from the reception of building 33, and the bus will be back at reception at 5 pm. Up to 22 people can take part in each visit. The calendar for the coming weeks is: Thursday 2 August in English Wednesday 8 August in French Wednesday 15 August in English Bookings should be made...

  11. k-visit Attribute Grammars

    DEFF Research Database (Denmark)

    Nielson, Hanne Riis; Skyum, S.

    1981-01-01

    It is shown that any well-defined attribute grammar is k-visit for some k. Furthermore, it is shown that given a well-defined grammar G and an integer k, it is decidable whether G is k-visit. Finally it is shown that the k-visit grammars specify a proper hierarchy with respect to translations...

  12. Lifestyle counseling in hypertension-related visits – analysis of video-taped general practice visits

    Directory of Open Access Journals (Sweden)

    van Dulmen Sandra

    2008-10-01

    Full Text Available Abstract Background The general practitioner (GP can play an important role in promoting a healthy lifestyle, which is especially relevant in people with an elevated risk of cardiovascular diseases due to hypertension. Therefore, the aim of this study was to determine the frequency and content of lifestyle counseling about weight loss, nutrition, physical activity, and smoking by GPs in hypertension-related visits. A distinction was made between the assessment of lifestyle (gathering information or measuring weight or waist circumference and giving lifestyle advice (giving a specific advice to change the patient's behavior or referring the patient to other sources of information or other health professionals. Methods For this study, we observed 212 video recordings of hypertension-related visits collected within the Second Dutch National Survey of General Practice in 2000/2001. Results The mean duration of visits was 9.8 minutes (range 2.5 to 30 minutes. In 40% of the visits lifestyle was discussed (n = 84, but in 81% of these visits this discussion lasted shorter than a quarter of the visit. An assessment of lifestyle was made in 77 visits (36%, most commonly regarding body weight and nutrition. In most cases the patient initiated the discussion about nutrition and physical activity, whereas the assessment of weight and smoking status was mostly initiated by the GP. In 35 visits (17% the GP gave lifestyle advice, but in only one fifth of these visits the patient's motivation or perceived barriers for changing behavior were assessed. Supporting factors were not discussed at all. Conclusion In 40% of the hypertension-related visits lifestyle topics were discussed. However, both the frequency and quality of lifestyle advice can be improved.

  13. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  14. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  15. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  16. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  17. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  18. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  19. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  20. Travel websites: Changing visits, evaluations and posts

    NARCIS (Netherlands)

    Bronner, Fred; de Hoog, Robert

    2016-01-01

    Many studies concerning the role of web-based information in tourism measure one-time interactions. This paper presents results of a longitudinal study. Data collected in 2014 about website visits, evaluations and posts, are compared with data from 2007. The main finding is the advance of sites

  1. Commissaire Moulin visits CERN

    CERN Multimedia

    CERN Bulletin

    2014-01-01

    The French actor and film-maker Yves Rénier was shown around the Laboratory on Friday 6 June by friends at CERN.   Yves Rénier at LEIR. (Photo: Ludwig Pregernig) A keen diver and star of the long-running French television police drama Commissaire Moulin, Yves Rénier took advantage of a stopover in Geneva on his way to the Red Sea to meet up with his friends from the CERN Diving Club, who were only too pleased to take him on a tour of the Laboratory. In the morning, Yves Rénier visited the CERN Control Centre (CCC), Linac2 and LEIR. After lunch at the brasserie in Restaurant No. 2, the actor continued his tour with the CERN Computer Centre, the SM18 superconducting magnet test facility, and lastly the ATLAS experiment. “Thank you so much for showing me around and introducing me to a world I knew so little about,” confided Yves Rénier. “It’s fascinating to see so many scientists of different cultures,...

  2. Claude Nicollier visits CERN

    CERN Multimedia

    Jordan Juras

    2011-01-01

    Switzerland’s first astronaut, Claude Nicollier, paid a short visit to CERN on Thursday 22 June, to lead a colloquium about the Hubble Space Telescope. With the Shuttle programme soon coming to an end. Nicollier recalled the enriching experience he had at NASA and gave us a preview of the futuristic project that he is currently involved in.   The colloquium, Hubble, the astronomer, the telescope, the results, surveyed the three themes suggested by its title: the fundamental discoveries made by Edwin Hubble in the early 20th century, servicing the telescope in orbit and the main results recently obtained relating to the structure and history of our universe. Nicollier spoke from the rare perspective of an astronaut who has had real contact with Hubble in orbit and included some of his own photography from the missions. Nicollier has an intimate relationship with the telescope that very few astrophysicists share. “I had the opportunity to service Hubble twice, both from the comf...

  3. Spaceflight participant visits CERN!

    CERN Multimedia

    Kathryn Coldham

    2016-01-01

    On 15 July, CERN welcomed spaceflight participant Anousheh Ansari.   Anousheh Ansari’s grin stretches from ear to ear, during an intriguing conversation with Nobel laureate Samuel C.C. Ting at AMS POCC. (Image: Maximilien Brice/CERN) Iranian-American Anousheh Ansari was the first-ever female spaceflight participant, spending eight days on the International Space Station (ISS) in 2006. She now has a new addition to her list of extraordinary sights ­– the home of the world’s largest particle accelerator: CERN.   On 15 July, Anousheh Ansari came to CERN and, unsurprisingly, visited the control room of the experiment attached to the ISS: the AMS. At the AMS Payload Operations Control Centre (AMS POCC) on CERN’s Prévessin site, she met the Nobel laureate Samuel Ting, spokesperson of the AMS experiment. Ansari and her accompanying guests were thrilled to expand their knowledge about CERN, its research and its...

  4. A royal visit

    CERN Multimedia

    2009-01-01

    On 19 February Albert II, King of the Belgians, visited CERN. He took a very active interest during his tour of the tunnel and the CMS cavern, in particular the pixel detector, which was made in Belgium. var flash_video_player=get_video_player_path(); insert_player_for_external('Video/Public/Movies/2009/CERN-MOVIE-2009-002/CERN-MOVIE-2009-002-0753-kbps-640x360-25-fps-audio-64-kbps-44-kHz-stereo', 'mms://mediastream.cern.ch/MediaArchive/Video/Public/Movies/2009/CERN-MOVIE-2009-002/CERN-MOVIE-2009-002-Multirate-200-to-753-kbps-640x360-25-fps.wmv', 'false', 533, 300, 'https://mediastream.cern.ch/MediaArchive/Video/Public/Movies/2009/CERN-MOVIE-2009-002/CERN-MOVIE-2009-002-posterframe-640x360-at-10-percent.jpg', '1164771', true, 'Video/Public/Movies/2009/CERN-MOVIE-2009-002/CERN-MOVIE-2009-002-0600-kbps-maxH-360-25-fps-audio-128-kbps-48-kHz-stereo.mp4'); Watch the video! Albert II, King of the Belgians receiving a souvenir from Sergio Bertolucci, Director for Research and...

  5. STUK visited Chelyabinsk

    International Nuclear Information System (INIS)

    Reponen, H.

    1994-01-01

    Early this year, experts of the Finnish Centre for Radiation and Nuclear Safety (STUK) visited the Chelyabinsk reprocessing plant in Russia to get an idea of the safety of the plant and the state of its environment. The plant is used, among other things, to process spent fuel from the Loviisa nuclear power plant. Chelyabinsk was originally established for the development of nuclear weapons. At the time, after the Second World War, safety was grossly neglected. Later the plant concentrated on the production of raw materials for bombs, and then safety was also taken into account as an issue of concern. Production of weapon grade plutonium ceased at Chelyabinsk in 1990. STUK's experts did not find any safety reasons that would justify stopping the transport of spent fuel. The principal threat to the area is by untended waste within the plant site. The waste was produced during the initial years of the plant's operation; it should be isolated from the environment quickly. Greenpeace has disclosed that the hospitals of the area have many cancer patients. Mismanagement during the early years of operation and two major accidents at Chelyabinsk resulted in radiation doses dangerous to the health of the population. It has not, however, been shown to what extent the current health problems are caused by the Chelyabinsk plant, and to what extent by other factors, for instance, the heavy-metal industry in the area. (orig.)

  6. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  7. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  8. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  9. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  10. The Medicare Annual Wellness Visit.

    Science.gov (United States)

    Colburn, Jessica L; Nothelle, Stephanie

    2018-02-01

    The Medicare Annual Wellness Visit is an annual preventive health benefit, which was created in 2011 as part of the Patient Protection and Affordable Care Act. The visit provides an opportunity for clinicians to review preventive health recommendations and screen for geriatric syndromes. In this article, the authors review the requirements of the Annual Wellness Visit, discuss ways to use the Annual Wellness Visit to improve the care of geriatric patients, and provide suggestions for how to incorporate this benefit into a busy clinic. Copyright © 2017 Elsevier Inc. All rights reserved.

  11. Father Attendance in Nurse Home Visitation

    Science.gov (United States)

    Holmberg, John R.; Olds, David L.

    2015-01-01

    Our aim was to examine the rates and predictors of father attendance at nurse home visits in replication sites of the Nurse-Family Partnership (NFP). Early childhood programs can facilitate father involvement in the lives of their children, but program improvements require an understanding of factors that predict father involvement. The sample consisted of 29,109 low-income, first-time mothers who received services from 694 nurses from 80 sites. We conducted mixed-model multiple regression analyses to identify population, implementation, site, and nurse influences on father attendance. Predictors of father attendance included a count of maternal visits (B = 0.12, SE = 0.01, F = 3101.77), frequent contact between parents (B = 0.61, SE = 0.02, F = 708.02), cohabitation (B = 1.41, SE = 0.07, F = 631.51), White maternal race (B = 0.77, SE = 0.06, F = 190.12), and marriage (B = 0.42, SE = 0.08, F = 30.08). Random effects for sites and nurses predicted father-visit participation (2.7 & 6.7% of the variance, respectively), even after controlling for population sociodemographic characteristics. These findings suggest that factors operating at the levels of sites and nurses influence father attendance at home visits, even after controlling for differences in populations served. Further inquiry about these influences on father visit attendance is likely to inform program-improvement efforts. PMID:25521707

  12. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  13. Hummingbirds Visit the Playground.

    Science.gov (United States)

    Ard, Linda; Wilkerson, Kristen

    1996-01-01

    Tells how hummingbirds can serve as a source of information and fun for children, including a rationale for attracting and teaching about hummingbirds and the outdoors. Explains that children need first-hand knowledge of nature and gives details on attracting hummingbirds and selecting safe plants for a hummingbird garden. (BGC)

  14. 150 Bulgarian students visit CERN

    CERN Multimedia

    Alizée Dauvergne

    2010-01-01

    Between 27 March and 8 April 2010, 150 Bulgarian students from the Astronomical Observatory in Varna visited CERN as part of the “From Galileo to CERN” programme. Bulgarian students participating in the "From Galileo to CERN" educational programme. “It’s interesting to combine astronomy and particle physics”, explains Svejina Dimitrova, organiser of the programme and Director of Varna Astronomical Observatory. The three groups, each one comprising 50 students, first visited Pisa, Padua and other places in Italy  related to Galileo’s life. “Thanks to the visit, students understood telescopes and why Galileo is such an important scientist”, says Svejina. After Italy, they came to CERN for three days and visited several sites: Linac, the Computer Centre CCC, etc. Another group of Bulgarian students in their visit to CERN. “They became aware that particle physics is not only the...

  15. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  16. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  17. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  18. Life satisfaction and frequency of doctor visits.

    Science.gov (United States)

    Kim, Eric S; Park, Nansook; Sun, Jennifer K; Smith, Jacqui; Peterson, Christopher

    2014-01-01

    Identifying positive psychological factors that reduce health care use may lead to innovative efforts that help build a more sustainable and high-quality health care system. Prospective studies indicate that life satisfaction is associated with good health behaviors, enhanced health, and longer life, but little information about the association between life satisfaction and health care use is available. We tested whether higher life satisfaction was prospectively associated with fewer doctor visits. We also examined potential interactions between life satisfaction and health behaviors. Participants were 6379 adults from the Health and Retirement Study, a prospective and nationally representative panel study of American adults older than 50 years. Participants were tracked for 4 years. We analyzed the data using a generalized linear model with a gamma distribution and log link. Higher life satisfaction was associated with fewer doctor visits. On a 6-point life satisfaction scale, each unit increase in life satisfaction was associated with an 11% decrease in doctor visits--after adjusting for sociodemographic factors (relative risk = 0.89, 95% confidence interval = 0.86-0.93). The most satisfied respondents (n = 1121; 17.58%) made 44% fewer doctor visits than did the least satisfied (n = 182; 2.85%). The association between higher life satisfaction and reduced doctor visits remained even after adjusting for baseline health and a wide range of sociodemographic, psychosocial, and health-related covariates (relative risk = 0.96, 95% confidence interval = 0.93-0.99). Higher life satisfaction is associated with fewer doctor visits, which may have important implications for reducing health care costs.

  19. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  20. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  1. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  2. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  3. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  4. Belgian firms visiting CERN

    CERN Multimedia

    FP Department

    2009-01-01

    25 – 26 MAY 2009 09.00 to 17.00 Monday 25 May 09.00 to 17.00 Tuesday 26 May Individual interviews will take place in technicians’ offices. The firms will contact relevant users/technicians but any user wishing to make contact with a particular firm is welcome to use the contact details which are available from each departmental secretariat or from the GS Department web pages here. List of Companies:Automation Services and Consulting BVBA Burrick NV, (PLC) Cissoid DB Engineering Design, Drafting & Services BVBA Entelec Control Systems GILLAM-Fei S.A. HPC ICSENSE IWT – Enterprise Europe Flanders Jema SA Mecasoft SA SA Polmans Rapid-Torc Resarm Engineering Plastics SA Sentera Europa NV SLC BVBA Stocker Industrie SA Technord Tecnubel Winlock BVBA For further information please contact Caroline Laignel (GS-DI 73722) or Karine Robert (GS-SEM-LS 74407).

  5. 76 FR 28194 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2011-05-16

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  6. 75 FR 27228 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2010-05-14

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  7. Home care, hospitalizations and doctor visits

    OpenAIRE

    Gonçalves Judite; Weaver France

    2014-01-01

    This study estimates the effects of formal home care on hospitalizations and doctor visits. We compare the effects of medically- and non-medically-related home care and investigate heterogeneous effects by age group and informal care availability. Two-part models are estimated, using data from Switzerland. In this federal country, home care policy is decentralized into cantons (i.e. states). The endogeneity of home care is addressed by using instrumental variables, canton and time fixed effec...

  8. Three European ministers visit CERN

    CERN Multimedia

    2007-01-01

    There have been three ministerial visits to CERN this month. Gediminas Kirkilas, Prime Minister of Lithuania, and Robert Aymar, CERN’s Director-General.On 2 July, the Prime Minister of Lithuania, Gediminas Kirkilas, was welcomed by CERN’s Director-General, Robert Aymar, before being taken on a visit of the ATLAS cavern at Point 2 and the LHC tunnel. Michal Sewerynski, Poland’s Minister for Science and Higher Education, and Robert Aymar, CERN’s Director-General.Ten days later, Poland’s Minister for Science and Higher Education, Michal Sewerynski, visited the CMS cavern and assembly hall and the LHC tunnel. He was also given a tour of the LHC Computer Centre and the CERN Control Centre. His visit was rounded off with a presentation of Polish companies involved in CERN’s activities, followed by a meeting with Polish personnel working at CERN. J�...

  9. A missed primary care appointment correlates with a subsequent emergency department visit among children with asthma.

    Science.gov (United States)

    McGovern, Colleen Marie; Redmond, Margaret; Arcoleo, Kimberly; Stukus, David R

    2017-11-01

    Since the Affordable Care Act's implementation, emergency department (ED) visits have increased. Poor asthma control increases the risk of acute exacerbations and preventable ED visits. The Centers for Medicare and Medicaid Services support the reduction of preventable ED visits to reduce healthcare spending. Implementation of interventions to avoid preventable ED visits has become a priority for many healthcare systems yet little data exist examining children's missed asthma management primary care (PC) appointments and subsequent ED visits. Longitudinal, retrospective review at a children's hospital was conducted for children with diagnosed asthma (ICD-9 493.xx), ages 2-18 years, scheduled for a PC visit between January 1, 2010, and June 30, 2012 (N = 3895). Records were cross-referenced with all asthma-related ED visits from January 1, 2010 to December 31, 2012. Logistic regression with maximum likelihood estimation was conducted. None of the children who completed a PC appointment experienced an ED visit in the subsequent 6 months whereas 2.7% of those with missed PC appointments had an ED visit (χ 2 = 64.28, p asthma as one mechanism for preventing ED visits was demonstrated. Interventions targeting missed visits could decrease asthma-related morbidity, preventable ED visits, and healthcare costs.

  10. Danish firms visit CERN

    CERN Multimedia

    FP Department

    2011-01-01

    30 – 31 JANUARY 2012 09:00 to 17:00 Monday 30 January 09:00 to 17:00 Tuesday 31 January Individual interviews will take place in technicians’ offices. The firms will contact relevant users/technicians but any user wishing to make contact with a particular firm is welcome to use the contact details available from the secretariat of their department or from the GS Department web page. List of Companies: · Axcon APS · BB Electronics A/S · B.Rustfrit Stal A/S · CIM Industrial Systems A/S · Danfysik A/S · Develco A/S · Eletronic A/S · GPV Group · Innoware A/S · JLI Vision A/S · NECAS A/S· NKT Cables A/S · Noliac A/S · Prodan A/S · Röttger’s Vaerktoj A/S · Vengcon APS For further information please contact Claudia Bruggmann Furlan  GS-IS-LS 73312 or Caroline Laignel GS-DI 73722.

  11. Visit of Spanish Government delegation

    CERN Multimedia

    CERN PhotoLab

    1982-01-01

    A Spanish Government delegation visited CERN before Spain rejoined CERN as a Member State(in 1983). Delegates interested in advanced technologies visited the ISR workshop clean room, where Romeo Perin explained fabrication and properties of stainless steel, titanium and inconel components of vacuum chambers for experiments at the ISR. Left to right: Technical Director Giorgio Brianti, the Spanish Minister of Industry and Energy Mr.Ignacio Bayon Marine , Romeo Perin, a delegate and Director-General Herwig Schopper. See also 8202369.

  12. Visiting Vehicle Ground Trajectory Tool

    Science.gov (United States)

    Hamm, Dustin

    2013-01-01

    The International Space Station (ISS) Visiting Vehicle Group needed a targeting tool for vehicles that rendezvous with the ISS. The Visiting Vehicle Ground Trajectory targeting tool provides the ability to perform both realtime and planning operations for the Visiting Vehicle Group. This tool provides a highly reconfigurable base, which allows the Visiting Vehicle Group to perform their work. The application is composed of a telemetry processing function, a relative motion function, a targeting function, a vector view, and 2D/3D world map type graphics. The software tool provides the ability to plan a rendezvous trajectory for vehicles that visit the ISS. It models these relative trajectories using planned and realtime data from the vehicle. The tool monitors ongoing rendezvous trajectory relative motion, and ensures visiting vehicles stay within agreed corridors. The software provides the ability to update or re-plan a rendezvous to support contingency operations. Adding new parameters and incorporating them into the system was previously not available on-the-fly. If an unanticipated capability wasn't discovered until the vehicle was flying, there was no way to update things.

  13. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  14. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  15. 30th November 2010 - Norwegian Ministry of Government Administration, Reform and Church Affairs State Secretary R. Valle signing the guest book with Head of International Relations F. Pauss and Director for Research and Scientific Computing S. Bertolucci; visiting CERN Computer Centre with Information Technology Department Head F. Hemmer.

    CERN Multimedia

    Maximilien Brice

    2010-01-01

    30th November 2010 - Norwegian Ministry of Government Administration, Reform and Church Affairs State Secretary R. Valle signing the guest book with Head of International Relations F. Pauss and Director for Research and Scientific Computing S. Bertolucci; visiting CERN Computer Centre with Information Technology Department Head F. Hemmer.

  16. Life Satisfaction and Frequency of Doctor Visits

    Science.gov (United States)

    Kim, Eric S.; Park, Nansook; Sun, Jennifer K.; Smith, Jacqui; Peterson, Christopher

    2015-01-01

    Objective Identifying positive psychological factors that reduce health care use may lead to innovative efforts that help build a more sustainable and high quality health care system. Prospective studies indicate that life satisfaction is associated with good health behaviors, enhanced health, and longer life, but little information is available about the association between life satisfaction and health care use. We tested whether higher life satisfaction was prospectively associated with fewer doctor visits. We also examined potential interactions between life satisfaction and health behaviors. Methods Participants were 6,379 adults from the Health and Retirement Study, a prospective and nationally representative panel study of American adults over the age of 50. Participants were tracked for four years. We analyzed the data using a generalized linear model with a gamma distribution and log link. Results Higher life satisfaction was associated with fewer doctor visits. On a six-point life satisfaction scale, each unit increase in life satisfaction was associated with an 11% decrease in doctor visits—after adjusting for sociodemographic factors (RR = 0.89, 95% CI = 0.86 to 0.93). The most satisfied respondents (N=1,121; 17.58%) made 44% fewer doctor visits than the least satisfied (N=182; 2.85%). The association between higher life satisfaction and reduced doctor visits remained even after adjusting for baseline health and a wide range of sociodemographic, psychosocial, and health-related covariates (RR = 0.96, 95% CI = 0.93 to 0.99). Conclusions Higher life satisfaction is associated with fewer doctor visits, which may have important implications for reducing health care costs. PMID:24336427

  17. Heuristic algorithms for scheduling heat-treatment furnaces of steel ...

    Indian Academy of Sciences (India)

    1Department of Management Studies, Indian Institute of Science,. Bangalore .... and scheduling, production monitoring and data capture, and management information. Southall ...... Project Report, Department of Management Studies, Indian.

  18. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  19. CERN confirms LHC schedule

    CERN Document Server

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  20. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  1. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  2. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  3. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  4. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  5. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  6. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  7. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  8. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  9. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  10. Reduction in all-cause otitis media-related outpatient visits in children after PCV10 introduction in Brazil.

    Science.gov (United States)

    Sartori, Ana L; Minamisava, Ruth; Bierrenbach, Ana L; Toscano, Cristiana M; Afonso, Eliane T; Morais-Neto, Otaliba L; Antunes, José L F; Cristo, Elier B; Andrade, Ana Lucia

    2017-01-01

    Few studies have reported the effect of 10-valent pneumococcal conjugate vaccine (PCV10) on otitis media (OM) in infants. In particular, no population-based study in upper-middle income countries is available. In 2010, Brazil introduced PCV10 into its routine National Immunization Program using a 3+1 schedule. We measured the impact of PCV10 on all-cause OM in children. An interrupted time-series analysis was conducted in Goiânia/Brazil considering monthly rates (per 100,000) of all-cause OM outpatient visits in children aged 2-23 months. We used case-based data from the Outpatient Visits Information System of the Unified Health System coded for ICD-10 diagnosis for the period of August/2008 to July/2015. As a comparator, we used rates of outpatient visits due to all-other causes. The relative reduction of all-cause OM and all-other causes of outpatient visits were calculated as the difference between the predicted and observed cumulative rates of the PCV10 post-vaccination period. We then subtracted the relative reduction of all-other causes of outpatient visits from all-cause OM to obtain the impact of PCV10 on OM. In total, 6,401 OM outpatient visits were recorded in 4,793 children aged 2-23 months. Of these, 922 (19.2%) children had more than one OM episode. A significant reduction in all-cause OM visits was observed (50.7%; 95%CI: 42.2-59.2%; p = 0.013), while the reduction in visits due to all-other causes was 7.7% (95% CI 0.8-14.7%; p<0.001). The impact of PCV10 on all-cause OM was thus estimated at 43.0% (95%CI 41.4-44.5). This is the first study to show significant PCV10 impact on OM outpatient visits in infants in a developing country. Our findings corroborate the available evidence from developed countries.

  11. UN Secretary General visits CERN

    CERN Multimedia

    2008-01-01

    UN Secretary General praises CERN in recent visit. Ban Ki-moon, Robert Aymar, CERN Director-General, and Sergei Ordzhonikidze, Director-General of the United Nations Office in Geneva at the CMS site.On Sunday 31 August, Ban Ki-moon, the UN Secretary General, made an important visit to CERN. Arriving in the late afternoon, he was warmly greeted at Point 5 by Robert Aymar, the Director-General, and the Sous-préfet of Gex, Olivier Laurens-Bernard. Accompanied by a UN delegation, Ban Ki-moon was also introduced to Jos Engelen, the Chief Scientific Officer, and Jim Virdee, the CMS spokesperson. He then took the opportunity to visit CMS and the machine tunnel. At the end of his short trip, Ban Ki-moon signed the Guest Book in the tradition of important dignitaries visiting CERN. Expressing his admiration for CERN’s spirit of collaboration, Ban Ki-moon said, "I am very honored to visit CERN, an invaluable scientific institution a...

  12. Analysis of Patient Visits and Collections After Opening a Satellite Pediatric Emergency Department.

    Science.gov (United States)

    Nichols, Katherine M; Caperell, Kerry; Cross, Keith; Duncan, Scott; Foster, Ben; Liu, Gil; Pritchard, Hank; Southard, Gary; Shinabery, Ben; Sutton, Brad; Kim, In K

    2018-04-01

    Satellite pediatric emergency departments (PEDs) have emerged as a strategy to increase patient capacity. We sought to determine the impact on patient visits, physician fee collections, and value of emergency department (ED) time at the primary PED after opening a nearby satellite PED. We also illustrate the spatial distribution of patient demographics and overlapping catchment areas for the primary and satellite PEDs using geographical information system. A structured, financial retrospective review was conducted. Aggregate patient demographic data and billing data were collected regarding physician fee charges, collections, and patient visits for both PEDs. All ED visits from January 2009 to December 2013 were analyzed. Geographical information system mapping using ArcGIS mapped ED patient visits. Patient visits at the primary PED were 53,050 in 2009 before the satellite PED opened. The primary PED visits increased after opening the satellite PED to 55,932 in 2013. The satellite PED visits increased to 21,590 in 2013. Collections per visit at the primary PED decreased from $105.13 per visit in 2011 to $86.91 per visit in 2013. Total collections at the satellite PED decreased per visit from $155.41 per visit in 2011 to $128.53 per visit in 2013. After opening a nearby satellite PED, patient visits at the primary PED did not substantially decrease, suggesting that there was a previously unrecognized demand for PED services. The collections per ED visit were greater at the satellite ED, likely due to a higher collection rate.

  13. The French Research Minister visits CERN

    CERN Multimedia

    2008-01-01

    On Friday, 6 June, the French Minister for Higher Education and Research, Valérie Pécresse, was welcomed by CERN Director-General, Robert Aymar. Robert Aymar accompanies Valérie Pécresse and Bernard Accoyer on a visit to CMS. A dozen physicists took part in the round-table discussion, including the Director-General, project leaders, deputy spokesmen, members of the experiments, CERN personnel and users.At first, the Minister was given a tour of the CMS experiment and the LHC tunnel, accompanied by the President of the French National Assembly, Bernard Accoyer. The delegation then took part in a round-table discussion. The main objective of the Minister’s visit was to obtain input on the organisation of large research infrastructures, based on information concerning CERN’s administrative and scientific configuration and the experiment collaborations. As J.-J. Blaising, Head of the PH Depa...

  14. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  15. Training Family Medicine Residents to Perform Home Visits: A CERA Survey.

    Science.gov (United States)

    Sairenji, Tomoko; Wilson, Stephen A; D'Amico, Frank; Peterson, Lars E

    2017-02-01

    Home visits have been shown to improve quality of care, save money, and improve outcomes. Primary care physicians are in an ideal position to provide these visits; of note, the Accreditation Council for Graduate Medical Education no longer requires home visits as a component of family medicine residency training. To investigate changes in home visit numbers and expectations, attitudes, and approaches to training among family medicine residency program directors. This research used the Council of Academic Family Medicine Educational Research Alliance (CERA) national survey of family medicine program directors in 2015. Questions addressed home visit practices, teaching and evaluation methods, common types of patient and visit categories, and barriers. There were 252 responses from 455 possible respondents, representing a response rate of 55%. At most programs, residents performed 2 to 5 home visits by graduation in both 2014 (69% of programs, 174 of 252) and 2015 (68%, 172 of 252). The vast majority (68%, 172 of 252) of program directors expect less than one-third of their graduates to provide home visits after graduation. Scheduling difficulties, lack of faculty time, and lack of resident time were the top 3 barriers to residents performing home visits. There appeared to be no decline in resident-performed home visits in family medicine residencies 1 year after they were no longer required. Family medicine program directors may recognize the value of home visits despite a lack of few formal curricula.

  16. Italy's Prime Minister visits CERN

    CERN Multimedia

    Stefania Pandolfi

    2015-01-01

    On Tuesday, 7 July 2015, the Prime Minister of the Italian Republic, Matteo Renzi, visited CERN. He was accompanied by a delegation that included Italy's Minister for Education, University and Research, Stefania Giannini.   From left to right: Fernando Ferroni, President of the Istituto Nazionale di Fisica Nucleare (INFN); Sergio Bertolucci, CERN Director for Research and Scientific Computing; Stefania Giannini, Italy's Minister of Education, University and Research; Matteo Renzi, Prime Minister of the Italian Republic; Fabiola Gianotti, CERN Director-General Designate; Rolf Heuer, CERN Director-General.   The Prime Minister was welcomed by members of the CERN Management together with former CERN Director-General and Senator for Life of the Italian Republic, Carlo Rubbia. After a brief general introduction to CERN’s activities by Rolf Heuer, the Italian delegation visited LHC Point 1. After a tour of the ATLAS control room, they donned helmets to visit th...

  17. Visits from Croatia and Belarus

    CERN Multimedia

    2003-01-01

    On 23 September, CERN was visited by two Ministers, Anatoly Rusetsky, Chairman of the Committee on Science and Technology of the Republic of Belarus, and Professor Gvozden Flego, Croatian Minister of Science and Technology. Mr Rusetsky met with Roger Cashmore, Research Director for Collider Programmes, and Michel Della Negra, spokesperson of the CMS experiment, and visited the CMS detector assembly hall. Professor Flego also met Mr Cashmore and visited the NA49 and CAST experiments, the LHC superconducting magnet test hall, the ALICE experiment cavern, and the assembly hall for the CMS experiment. From left to right: Nikola Godinovic, working at CMS, Jürgen Schukraft, ALICE spokesperson, Gordan Markotic, Ambassador and Permanent Representative of Croatia to the United Nations and other international organisations in Geneva, Professor Gvozden Flego, Minister of Science and Technology, Republic of Croatia.

  18. About an Optimal Visiting Problem

    Energy Technology Data Exchange (ETDEWEB)

    Bagagiolo, Fabio, E-mail: bagagiol@science.unitn.it; Benetton, Michela [Unversita di Trento, Dipartimento di Matematica (Italy)

    2012-02-15

    In this paper we are concerned with the optimal control problem consisting in minimizing the time for reaching (visiting) a fixed number of target sets, in particular more than one target. Such a problem is of course reminiscent of the famous 'Traveling Salesman Problem' and brings all its computational difficulties. Our aim is to apply the dynamic programming technique in order to characterize the value function of the problem as the unique viscosity solution of a suitable Hamilton-Jacobi equation. We introduce some 'external' variables, one per target, which keep in memory whether the corresponding target is already visited or not, and we transform the visiting problem in a suitable Mayer problem. This fact allows us to overcome the lacking of the Dynamic Programming Principle for the originary problem. The external variables evolve with a hysteresis law and the Hamilton-Jacobi equation turns out to be discontinuous.

  19. Visit of the Italian President

    CERN Multimedia

    2003-01-01

    "CERN stands as the demonstration of the great results that science can achieve [...] when it succeeds in getting all the main players in international scientific cooperation involved," stated the President of the Italian Republic, Carlo Azeglio Ciampi, in front of an overcrowded and enthusiastic Main Auditorium. The President visited CERN on 2nd December, and met the CERN directorate as well as the Italians at CERN. With about 1500 Italians working at CERN, which is one sixth of the total personnel, they are the second largest nationality at CERN. The Italian President visited the CMS assembly hall and the LHC superconducting magnet test hall before meeting the CERN community, in particular Italian personnel, in the main auditorium. There he emphasised the role of CERN as a transnational model for research which not only achieved great results in science but is also a powerful vehicle for progress in other fields. President Ciampi visits the LHC superconducting test hall together with Luciano Maiani and Lu...

  20. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  1. Some effects of overall rate of earning reinforcers on run lengths and visit durations.

    Science.gov (United States)

    Macdonall, James S

    2006-07-01

    In a concurrent schedule, responding at each alternative is controlled by a pair of schedules that arrange reinforcers for staying at that alternative and reinforcers for switching to the other alternative. Each pair of schedules operates only while at the associated alternative. When only one pair of stay and switch schedules is presented, the rates of earning reinforcers for staying divided by the rates of earning reinforcers for switching controls the mean number responses in a visit and the mean duration of visits. The purpose of the present experiment was to see whether the sum of the rates of earning stay and switch reinforcers changed the way that run length and visit duration were affected by the ratio of the rates of stay to switch reinforcers. Rats were exposed to pairs of stay and switch schedules that varied both the ratio of the rates of earning stay and switch reinforcers and the sum of the rates of earning stay and switch reinforcers. Run lengths and visit durations were joint functions of the ratio of the rates of earning stay and switch reinforcers and the sum of the rates of earning stay and switch reinforcers. These results shows that the effect of the ratio of the sum of the rates of earning stay and switch reinforcers results from processes operating at the alternative, rather than from processes operating at both alternatives.

  2. Bavarian Prime Minister to Visit la Silla

    Science.gov (United States)

    1997-03-01

    The Bavarian Prime Minister, Dr. Edmund Stoiber , is currently visiting a number of countries in South America. He is accompanied by a high-ranking delegation of representatives of Bavarian politics and industry. During this trip, the Bavarian delegation will visit the Republic of Chile, arriving in Santiago de Chile on Sunday, March 9, 1997. On the same day, Dr. Stoiber and most other members of the delegation, on the invitation of the Director General of ESO, Professor Riccardo Giacconi, will visit the ESO La Silla Observatory , located in an isolated area in the Atacama desert some 600 km north of the Chilean capital. ESO, the European Organisation for Astronomy, with Headquarters in Garching near Munich in Bavaria, welcomes this opportunity to present its high-tech research facilities to Dr. Stoiber and leaders of the Bavarian industry. During the visit, the delegation will learn about the various front-line research projects, now being carried out by astronomers from Germany and other ESO member countries with the large telescopes at La Silla. There will also be a presentation of the ESO VLT project , which will become the world's largest optical astronomical telescope, when it is ready a few years from now. The delegation will be met by the Director of the La Silla Observatory, Dr. Jorge Melnick and his scientific-technical staff which includes several members of German nationality. Also present will be ESO's Head of Administration, Dr. Norbert König (Garching) and the General Manager of ESO in Chile, Mr. Daniel Hofstadt. More information about this visit and the ESO facilities is available from the ESO Education and Public Relations Department (Tel.: +49-89-32006-276; Fax.: +49-89-3202362; email: ips@eso.org; Web: http://www.eso.org../../../epr/ ). Diese Pressemitteilung ist auch in einer Deutschen Fassung vorhanden. How to obtain ESO Press Information ESO Press Information is made available on the World-Wide Web (URL: http://www.eso.org../). ESO Press

  3. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  4. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  5. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  6. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  7. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  8. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  9. Home visits: why do rates vary so much?

    LENUS (Irish Health Repository)

    Stewart, P

    2012-03-01

    Data including information on patient age, gender, who initiated the visit and call classification was collected during office hours from 12 G.P. rural teaching practices with a combined GMS patient population of 24,720, over a 2 month period. There were a total of 603 home visits, giving an annual visiting rate of 143\\/1000. Visiting rates varied between practices from 45 to 305\\/1000 per year. When high visiting practices (>210\\/1000\\/year) were compared to low visiting rate practices (>90\\/1000\\/year), patients tended to be older (79.7 v. 74.5 years) and calls were 12 times more likely to be doctor initiated (16.6% v. 1.4%) or classified as routine( 50.7% v. 44.9%). The variation between practices was related in part to patient age but appears largely due to differences in doctor home visiting behaviour. There are no recent figures on home visiting in Ireland.

  10. Virtual Visits in Home Health Care for Older Adults

    Directory of Open Access Journals (Sweden)

    Anne Marie Lunde Husebø

    2014-01-01

    Full Text Available Background. This review identifies the content of virtual visits in community nursing services to older adults and explores the manner in which service users and the nurses use virtual visits. Design. An integrative literature review. Method. Data collection comprised a literature search in three databases: Cinahl, Medline, and PubMed. In addition, a manual search of reference lists and expert consultation were performed. A total of 12 articles met the inclusion criteria. The articles were reviewed in terms of study characteristics, service content and utilization, and patient and health care provider experience. Results. Our review shows that in most studies the service is delivered on a daily basis and in combination with in-person visits. The findings suggest that older home-dwelling patients can benefit from virtual visits in terms of enhanced social inclusion and medication compliance. Service users and their nurses found virtual visits satisfactory and suitable for care delivery in home care to the elderly. Evidence for cost-saving benefits of virtual visits was not found. Conclusions. The findings can inform the planning of virtual visits in home health care as a complementary service to in-person visits, in order to meet the increasingly complex needs of older adults living at home.

  11. “VICO”, Visiting Colleagues

    CERN Multimedia

    Staff Association

    2017-01-01

    “Hello, I am your delegate” – have you heard this line? Maybe you have already had the pleasure of receiving a visit from a Staff Association delegate – then you know what this is all about. As for those of you, who have not yet heard these words, it’s time to get curious. The Staff Association has decided to embark upon an adventure called “VICO”, Visiting Colleagues. From past experience, we have understood the value of personal, direct contact with the people we represent. We believe that the best way to achieve this is to knock on your office door and pay you a short visit.  We do not want to make you fill in yet another online questionnaire and would much rather collect your feedback in a short conversation face to face. Of course, we have prepared ourselves thoroughly for these visit rounds, because we do not want to waste your time. We welcome criticism because it can make us aware of our shortcomings, tell us about how y...

  12. Prenatal Care: First Trimester Visits

    Science.gov (United States)

    ... care provider will discuss the importance of proper nutrition and prenatal vitamins. Your first prenatal visit is a good time to discuss exercise, sex during pregnancy and other lifestyle issues. You might also discuss your work environment and the use of medications during pregnancy. If ...

  13. Visiting School Campuses: Reporter Guide

    Science.gov (United States)

    Carr, Sarah

    2013-01-01

    Spending time in schools and classrooms can be one of the best ways for novice reporters to dive into the education beat, and for veteran journalists to find fresh inspiration. While it is certainly not necessary for every story, education journalists should try their best to make time to visit schools. Classroom observations and campus tours help…

  14. Visit of the Austrian Ambassador

    CERN Multimedia

    Patrice Loïez

    2002-01-01

    The Austrian Ambassador Wolfgang Petritsch (light raincoat) learns about superconducting magnets at the LHC magnet test facility in building SM18 during a visit to CERN. The blue pipe-like structure in the left background is String 2: the 120-m long full-scale model of an LHC cell, which is used to test LHC systems.

  15. President of Ecuador visits CERN

    CERN Multimedia

    Rosaria Marraffino

    2014-01-01

    On Friday, 24 October, Dr. Rafael Correa Delgado, President of the Republic of Ecuador, visited CERN.   Visiting Geneva to deliver a lecture at the UN, Ecuadorian President Rafael Correa Delgado seized the chance to have a short but intense visit of the Laboratory. The President was met at LHC Point 1 by the Director for Research and Scientific Computing Sergio Bertolucci, who gave him an introduction to CERN’s activities.He was also introduced to the Director for Accelerators and Technology, Frédérick Bordry, and Department Heads José Miguel Jiménez (TE), Livio Mapelli (PH) and Roberto Saban (EN). President Correa Delgado also met with Martijn Mulders, co-organiser of the CERN Latin America School of High-Energy Physics, which will be held in Ecuador from 4 to 17 March 2015. Shortly after that, he visited the ATLAS experimental cavern which he toured with ATLAS Collaboration Spokesperson David Charlton and Fernando Monticelli of t...

  16. Beautiful Science: Worth a Visit

    Science.gov (United States)

    Bingham, Frederick M.

    2013-01-01

    For those in the profession of teaching physics who reside in or plan to visit the Los Angeles area, I would highly recommend a trip to the Huntington Library in San Marino, specifically to a permanent exhibit entitled "Beautiful Science: Ideas that Changed the World" in the Dibner Hall of the History of Science. The exhibit contains…

  17. Child Custody, Visitation and Maintenance ...

    African Journals Online (AJOL)

    Nigussie Afesha

    2017-12-30

    Dec 30, 2017 ... The important thing here is fixing or determining which custody arrangement is ..... assuring the child's safety.86 Hence, supervised visitation can be ordered to ... safety, physical or mental health or other adverse effects on the feelings and emotional .... However, “In case of death, disability, unworthiness or.

  18. Swiss President to visit CERN

    CERN Multimedia

    2003-01-01

    "Pascal Couchepin, President of the Swiss Confederation, will visit CERN on 4 June to participate in the official inauguration of the underground cavern for the laboratory's ATLAS experiment. As the first new experimental cavern to be handed over to CERN by civil engineering contractors, this represents an important milestone for the Laboratory" (1 page).

  19. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  20. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  1. 17 CFR 240.13d-101 - Schedule 13D-Information to be included in statements filed pursuant to § 240.13d-1(a) and...

    Science.gov (United States)

    2010-04-01

    ... directors or to fill any existing vacancies on the board; (e) Any material change in the present... best of my knowledge and belief, I certify that the information set forth in this statement is true... existing Securities Exchange Act rules as to such matters as clarity and size (Securities Exchange Act Rule...

  2. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  3. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  4. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  5. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  6. 28 CFR 540.41 - Visiting facilities.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Visiting facilities. 540.41 Section 540... WITH PERSONS IN THE COMMUNITY Visiting Regulations § 540.41 Visiting facilities. The Warden shall have... have a portion of the visiting room equipped and set up to provide facilities for the children of...

  7. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  8. Examination of office visit patient preferences for the after-visit summary (AVS).

    Science.gov (United States)

    Neuberger, Marolee; Dontje, Katherine; Holzman, Greg; Corser, Bill; Keskimaki, Abigail; Chant, Ericka

    2014-01-01

    The federal government advocates the practice of routinely providing an after-visit summary (AVS) to patients after each office-based visit as an element of stage 1 meaningful use. A significant potential benefit of the AVS is improved patient engagement achieved by enabling patients and family members to better understand and retain key health information. The methodology for this study was a mixed-methods pilot study to examine, through the perspectives of adult primary care patients, how relevant and actionable data can be better formatted in the AVS. Results of this study suggest that the goal of the AVS to serve as a communication tool to engage and support patients is frequently not being met. Further study is needed to understand, from the viewpoints of patients and providers, what barriers are keeping them from optimally providing and using the information on the AVS.

  9. Weather and Prey Predict Mammals' Visitation to Water.

    Directory of Open Access Journals (Sweden)

    Grant Harris

    Full Text Available Throughout many arid lands of Africa, Australia and the United States, wildlife agencies provide water year-round for increasing game populations and enhancing biodiversity, despite concerns that water provisioning may favor species more dependent on water, increase predation, and reduce biodiversity. In part, understanding the effects of water provisioning requires identifying why and when animals visit water. Employing this information, by matching water provisioning with use by target species, could assist wildlife management objectives while mitigating unintended consequences of year-round watering regimes. Therefore, we examined if weather variables (maximum temperature, relative humidity [RH], vapor pressure deficit [VPD], long and short-term precipitation and predator-prey relationships (i.e., prey presence predicted water visitation by 9 mammals. We modeled visitation as recorded by trail cameras at Sevilleta National Wildlife Refuge, New Mexico, USA (June 2009 to September 2014 using generalized linear modeling. For 3 native ungulates, elk (Cervus Canadensis, mule deer (Odocoileus hemionus, and pronghorn (Antilocapra americana, less long-term precipitation and higher maximum temperatures increased visitation, including RH for mule deer. Less long-term precipitation and higher VPD increased oryx (Oryx gazella and desert cottontail rabbits (Sylvilagus audubonii visitation. Long-term precipitation, with RH or VPD, predicted visitation for black-tailed jackrabbits (Lepus californicus. Standardized model coefficients demonstrated that the amount of long-term precipitation influenced herbivore visitation most. Weather (especially maximum temperature and prey (cottontails and jackrabbits predicted bobcat (Lynx rufus visitation. Mule deer visitation had the largest influence on coyote (Canis latrans visitation. Puma (Puma concolor visitation was solely predicted by prey visitation (elk, mule deer, oryx. Most ungulate visitation peaked during

  10. Weather and Prey Predict Mammals’ Visitation to Water

    Science.gov (United States)

    Harris, Grant; Sanderson, James G.; Erz, Jon; Lehnen, Sarah E.; Butler, Matthew J.

    2015-01-01

    Throughout many arid lands of Africa, Australia and the United States, wildlife agencies provide water year-round for increasing game populations and enhancing biodiversity, despite concerns that water provisioning may favor species more dependent on water, increase predation, and reduce biodiversity. In part, understanding the effects of water provisioning requires identifying why and when animals visit water. Employing this information, by matching water provisioning with use by target species, could assist wildlife management objectives while mitigating unintended consequences of year-round watering regimes. Therefore, we examined if weather variables (maximum temperature, relative humidity [RH], vapor pressure deficit [VPD], long and short-term precipitation) and predator-prey relationships (i.e., prey presence) predicted water visitation by 9 mammals. We modeled visitation as recorded by trail cameras at Sevilleta National Wildlife Refuge, New Mexico, USA (June 2009 to September 2014) using generalized linear modeling. For 3 native ungulates, elk (Cervus Canadensis), mule deer (Odocoileus hemionus), and pronghorn (Antilocapra americana), less long-term precipitation and higher maximum temperatures increased visitation, including RH for mule deer. Less long-term precipitation and higher VPD increased oryx (Oryx gazella) and desert cottontail rabbits (Sylvilagus audubonii) visitation. Long-term precipitation, with RH or VPD, predicted visitation for black-tailed jackrabbits (Lepus californicus). Standardized model coefficients demonstrated that the amount of long-term precipitation influenced herbivore visitation most. Weather (especially maximum temperature) and prey (cottontails and jackrabbits) predicted bobcat (Lynx rufus) visitation. Mule deer visitation had the largest influence on coyote (Canis latrans) visitation. Puma (Puma concolor) visitation was solely predicted by prey visitation (elk, mule deer, oryx). Most ungulate visitation peaked during May and

  11. 12 CFR 404.9 - Schedule of fees.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Schedule of fees. 404.9 Section 404.9 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES INFORMATION DISCLOSURE Procedures for Disclosure of Records Under the Freedom of Information Act. § 404.9 Schedule of fees. (a) General. Ex-Im Bank shall...

  12. Young EIROforum prizewinner visits CERN

    CERN Multimedia

    CERN Bulletin

    2015-01-01

    On 27 to 31 July, CERN welcomed Paul Clarke, an 18-year-old Irish mathematician who won a CERN EIROforum prize (second place) at EUCYS 2014 (European Union Contest for Young Scientists).   Paul Clarke, visiting the new Microcosm exhibit. In addition to a €5000 prize, Paul visited the Laboratory and its experiments, meeting and speaking with CERN physicists and computer scientists. Paul's winning project is entitled "Contributions to cyclic graph theory." As the summary of the project suggests, graph theory is an area of pure mathematics which studies properties of linkages and networks. It has applications in several areas including computing, molecular structure, neuroscience, search engines, engineering etc. This project makes a profound contribution to the study of graphs. It identifies key concepts and provides the methodology to apply them to some long-standing major problems in the subject with great success. Paul has just finished high sc...

  13. An Algerian Minister visits CERN

    CERN Multimedia

    2006-01-01

    The Algerian Minister of Higher Education and Scientific Research, Rachid Haraoubia, visited CERN on 14 November. His party included the Rector of the University of Blida and the Director of the Algerian Ecole Nationale Polytechnique. Welcomed by CERN's Director-General, Robert Aymar, and Secretary-General, Maximilien Metzger, he signed the VIP Visitors' Book before going on to visit the ATLAS experiment and the LHC tunnel. He then had the opportunity to meet Algerian scientists working at CERN. Some fifteen Algerian physicists attached to European and US institutes are participating in the LHC experiments, in particular ATLAS. A formal collaboration agreement between Algeria and CERN is expected to be drawn up in the near future.

  14. DPT Researchers’ Visit to Moscow

    DEFF Research Database (Denmark)

    Singla, Rashmi; Popova, Margarita

    2018-01-01

    to three colleagues from MSUPE. Our staff members’ presentations focused on presenting Problem-oriented Project Learning and group work, RUC’s Social Psychology of Everyday Life study program, as well as research on diversity, migration and cross-cultural psychology in the joint seminars with MSUPE staff......Four researchers from our department (DPT/IMT) Hans S. Andersen, Margarita Popova, Niklas Chimmiri & Rashmi Singla spent five intellectually, geographically and socially stimulating days at Moscow State University of Psychology and Education (MSUPE), as part of an Erasmus+ staff knowledge exchange...... visit. Conceptually grounded discussions of psychological and educational research projects building on the Cultural-Historical School of Psychology, founded in Russia (L. S. Vygotsky, A. N. Leontiev, A. R. Luria), formed the main framing for the visit. In April 2017, RUC had already acted as host...

  15. Two pioneering artists visit CERN

    CERN Multimedia

    CERN Bulletin

    2015-01-01

    On Monday, 19 January, CERN physicists welcomed musician Tim Blake - progressive rock keyboard and theremin player - and architectural lighting designer Patrice Warrener - inventor of the Chromolithe Polychromatic Illumination system, used in Lyon’s “Fête des Lumières”. Together, they make up the musical duo "Crystal Machine".   The artists visit the Antiproton Decelerator. (Image: Django Manglunki.)   Their visit began with an introduction to CERN by their friend Django Manglunki, project leader for the ion injector chain, and an improvised discussion on the LHC extraction system with Roger Barlow, kicker magnet controls expert and progressive rock fan. This was followed by a quick trip to the CCC, the server room and the SPS RF amplifiers in BA3. Next on the itinerary was a tour of the AD and anti-hydrogen experiments led by Michael Doser, AEgIS Spokesperson. A leisurely lunch followed, in the company ...

  16. A Croatian delegation visits CERN

    CERN Multimedia

    2001-01-01

    Professor Hrvoje Kraljeviç signing the Golden book with Professor Roger Cashmore. A Croatian delegation composed of the Minister of Science and Technology, Professor Hrvoje Kraljeviç, his deputy for international collaboration Prof. Davor Butkovic have visited CERN on the 12 and 13th of February and held talks with the CERN authorities, ALICE and CMS spokespersons on the possibilities to increase the participation of Croatia to the LHC related activities.

  17. US Cub Scouts visit CERN

    CERN Multimedia

    2001-01-01

    A group of young American Cub Scouts from Den 10, Pack 130 (based in Geneva) at the Microcosm last Saturday. On their trip to CERN, which included the first Visits Service tour of the ATLAS construction site, the scouts were able to satisfy most of the requirements for the Cub Scout engineering badge. From left to right: Edouard Vincent, Ariel Litke, Alexander Richter, Antoine Vidal de Saint Phalle, Jason Iredale and Daniel Reghelini.

  18. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  19. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  20. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  1. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  2. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  3. Hanford/Tomsk reciprocal site visit: Plutonium agreement compliance talks

    International Nuclear Information System (INIS)

    Libby, R.A.; Sorenson, R.; Six, D.; Schiegel, S.C.

    1994-11-01

    The objective of the visit to Hanford Site was to: demonstrate equipment, technology, and methods for calculating Pu production, measuring integrated reactor power, and storing and safeguarding PuO 2 ; demonstrate the shutdown of Hanford production reactors; and foster openness and transparency of Hanford operations. The first day's visit was an introduction to Hanford and a review of the history of the reactors. The second day consisted of discussions on the production reactors, reprocessing operations, and PuO 2 storage. The group divided on the third day to tour facilities. Group A toured the N reactor, K-West reactor, K-West Basins, B reactor, and participated in a demonstration and discussion of reactor modeling computer codes. Group B toured the Hanford Pu Storage Facility, 200-East Area, N-cell (oxide loadout station), the Automated Storage Facility, and the Nondestructive Assay Measurement System. Group discussions were held during the last day of the visit, which included scheduling of a US visit to Russia

  4. Simulating clinical trial visits yields patient insights into study design and recruitment

    Directory of Open Access Journals (Sweden)

    Lim SS

    2017-07-01

    Full Text Available S Sam Lim,1 Alan J Kivitz,2 Doug McKinnell,3 M Edward Pierson,4 Faye S O’Brien4 1Division of Rheumatology, Department of Medicine, Emory University, Atlanta, GA, USA; 2Altoona Center for Clinical Research, Altoona, PA, USA; 3Deloitte Life Sciences Advisory, Basel, Switzerland; 4Clinical Operations, Global Medicines Development, AstraZeneca, Gaithersburg, MD, USA Purpose: We elicited patient experiences from clinical trial simulations to aid in future trial development and to improve patient recruitment and retention.Patients and methods: Two simulations of draft Phase II and Phase III anifrolumab studies for systemic lupus erythematosus (SLE/lupus nephritis (LN were performed involving African-American patients from Grady Hospital, an indigent care hospital in Atlanta, GA, USA, and white patients from Altoona Arthritis and Osteoporosis Center in Altoona, PA, USA. The clinical trial simulation included an informed consent procedure, a mock screening visit, a mock dosing visit, and a debriefing period for patients and staff. Patients and staff were interviewed to obtain sentiments and perceptions related to the simulated visits.Results: The Atlanta study involved 6 African-American patients (5 female aged 27–60 years with moderate to severe SLE/LN. The Altoona study involved 12 white females aged 32–75 years with mild to moderate SLE/LN. Patient experiences had an impact on four patient-centric care domains: 1 information, communication, and education; 2 responsiveness to needs; 3 access to care; and 4 coordination of care; and continuity and transition. Patients in both studies desired background material, knowledgeable staff, family and friend support, personal results, comfortable settings, shorter wait times, and greater scheduling flexibility. Compared with the Altoona study patients, Atlanta study patients reported greater preferences for information from the Internet, need for strong community and online support, difficulties in

  5. Streaming system scheduling for Xeon Phi

    OpenAIRE

    Faltín, Tomáš

    2017-01-01

    Task scheduling in operating system area is a well-known problem on traditional system architectures (NUMA, SMP). Unfortunately, it does not perform well on emerging many-core architectures, especially on Intel Xeon Phi. We collected all publicly available information about the architecture of Xeon Phi. After that, we benchmarked the Xeon Phi in order to find the missing information about its architecture. We focused especially on the information about cores and memory controllers. These are ...

  6. Genetic algorithm to solve the problems of lectures and practicums scheduling

    Science.gov (United States)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  7. Crew of Hubble Space Telescope servicing mission visits Europe

    Science.gov (United States)

    1994-01-01

    The Hubble Space telescope servicing mission in December (STS-61) was a great success and the fully refurbished orbiting telescope produced absolutely remarkable first results just two weeks ago. The 7-member crew who carried out the mission will soon be in Europe to share their experience with the Press, ESA space specialists and the European space community. Public conferences will also be held in Switzerland, the home country of ESA astronaut Claude Nicollier. The visit of the STS-61 crew is scheduled as follows: Friday 11 February, 1994 - ESA Paris, France Presentation and Press Conference Location: ESA, 8/10 Rue Mario Nikis, 75015 Paris time: 16:00 hrs - 17:30 hrs contact: ESA, Public Relations Office Tel. (+33) 1 42 73 71 55 Fax. (+33) 1 42 73 76 90 Monday 14 February, 1994 - British Aerospace, Bristol, United Kingdom Presentation and Press Conference Location: British Aerospace, FPC 333, Filton, Bristol BS12 7QW time: 10:00 hrs - 12:00 hrs contact: BAe, Public Relations Tel. (+44) 272 36 33 69 Tel. (+44) 272 36 33 68 Tuesday 15 February, 1994 - ESA/ESTEC, Noordwijk, the Netherlands Presentation and Press Conference Location: Noordwijk Space Expo, Keplerlaan 3, 2201 AZ Noordwijk, the Netherlands time: 09:30 hrs - 12:00 hrs contact: ESTEC Public Relations Office Tel. (+31) 1719 8 3006 Fax. (+31) 1719 17 400 Wednesday 16 February, 1944 - ESO, Garching - Munich, Germany Presentation and Press Conference Location: European Southern Observatory, Karl- Schwarzschild-Str. 2, 85748 Garching -Munich, Germany time: to be decided contact: ESO Information Service Tel. (+49) 89 32 006 276 Fax. (+49) 89 320 23 62 Thursday 17 February, 1994 - Bern, Switzerland a. Presentation and Press Conference Location: Hotel Bern, Zeughausgasse 9, 3001 Bern, Switzerland time: 09:30 hrs contact: Press & Information Service of the Federal Dept. for Education & Sciences Tel. (+41) 31 322 80 34 Fax. (+41) 31 312 30 15 b. Public conference Location: University of Bern, Institute of Physics

  8. VISIT OF BELGIAN FIRMS AT CERN

    CERN Multimedia

    2001-01-01

    2 - 3 APRIL 2001 14h00 to 17h30 Monday 2nd 09h00 to 17h30 Tuesday 3rd The firms will be in the Main Building - Pas Perdus and Mezzanine List of Companies: Alcatel ETCA Amos S.A. Asco Industries N.V. Barco N.V. Belgatom Capaul S.A. Comelec S.A. Groupe Hamon HTMS (High Tech Metal Seals) N.V. Kelatron S.A. Mécanique de Précision pour Equipements Mecasoft S.A. Pauwels International N.V. Penders & Vanherle Elektrotechniek N.V. Resarm Engineering Plastics S.A. Simonis Plastic S.A. Techspace Aero S.A. Verhaert Design & Development N.V. Detailed information on the companies is also available on the Web: http://spl-purchasing.web.cern.ch/spl-purchasing/exhibitions_visits.htm For further information please contact Mrs C.L. Jullien-Woringer (tel. 73722-76360)

  9. VISIT OF BELFIAN FIRMS AT CERN

    CERN Multimedia

    2001-01-01

    2 - 3 APRIL 2001 14h00 to 17h30 Monday 2nd 09h00 to 17h30 Tuesday 3rd The firms will be in the Main Building - Pas Perdus and Mezzanine List of Companies: Alcatel ETCA Amos S.A. Asco Industries N.V. Barco N.V. Belgatom Capaul S.A. Comelec S.A. Groupe Hamon HTMS (High Tech Metal Seals) N.V. Kelatron S.A. Mécanique de Précision pour Equipements Mecasoft S.A. Pauwels International N.V. Penders & Vanherle Elektrotechniek N.V. Resarm Engineering Plastics S.A. Simonis Plastic S.A. Techspace Aero S.A. Verhaert Design & Development N.V. Detailed information on the companies is also available on the Web: http://spl-purchasing.web.cern.ch/spl-purchasing/exhibitions_visits.htm For further information please contact Mrs C.L. Jullien-Woringer (tel. 73722-76360)

  10. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  11. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  12. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  13. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  14. PLACEMENT APPLICATIONS SCHEDULING LECTURE IN INTERNATIONAL PROGRAM UNIKOM BASED ANDROID

    Directory of Open Access Journals (Sweden)

    Andri Sahata Sitanggang

    2017-12-01

    Full Text Available One who determines life of a classroom namely mapping scheduling courses especially at college. The process scheduling has included time or schedule of a class of available, room available, lecture who is scheduled for, and schedule for lecturer going to teach. Hopefully with a scheduling it will facilitate the students and teachers in obtaining information lecture schedule. With the emergence of the android application ( is implanted in mobile phones , the public can now use the internet so fast that is based .So with that researchers give one a technology based solutions to build android application .This is because one of the technology has given the functions which may make it easier for students and university lecturers in terms of access to information. In building this application used method of the prototype consisting 2 access namely access user and admin , where module user consisting of modules register , login , scheduling module , while for admin given module login , register and arrangement information scheduling courses both the administration and lecturers .Application made will be integrated with internet so that this program is real-time application.

  15. 20 CFR 402.165 - Fee schedule.

    Science.gov (United States)

    2010-04-01

    ... requester for the services rendered. (i) Fee for copies of printed materials. When extra copies of printed... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Fee schedule. 402.165 Section 402.165 Employees' Benefits SOCIAL SECURITY ADMINISTRATION AVAILABILITY OF INFORMATION AND RECORDS TO THE PUBLIC...

  16. Irrigation scheduling with the neutron probe

    International Nuclear Information System (INIS)

    Travers, P.

    1987-01-01

    The operational theory of the neutron probe is briefly outlined and its application and uses discussed in relation to determination of soil compaction and irrigation scheduling. Graphic examples are given of alluvial soil moisture profiles and how this information can be used to improve trickle irrigation in vineyards. 3 refs., 7 figs

  17. 29 CFR 1952.211 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual developed by July, 1973; (c) Management Information System, December, 1975; (d) Training in compliance...

  18. 29 CFR 1952.201 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Retraining of present occupational safety and health personnel during March-May 1973; (b... legislation, August 1, 1973; (d) Regulations on variances, August 1973; (e) Management information system...

  19. 29 CFR 1952.341 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Developmental schedule. 1952.341 Section 1952.341 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... State Legislature January 1975 and to become effective by May 1, 1975. (d) Management Information System...

  20. 76 FR 10233 - Schedule of Water Charges

    Science.gov (United States)

    2011-02-24

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 420 Schedule of Water Charges AGENCY: Delaware River..., Part III, Basin Regulations--Water Supply Charges. Accordingly, the Commission's water charging rates..., 2011. Effective Date: February 24, 2011. FOR FURTHER INFORMATION CONTACT: For questions about the water...

  1. Are behaviors at one alternative in concurrent schedules independent of contingencies at the other alternative?

    Science.gov (United States)

    MacDonall, James S

    2017-09-01

    Some have reported changing the schedule at one alternative of a concurrent schedule changed responding at the other alternative (Catania, 1969), which seems odd because no contingencies were changed there. When concurrent schedules are programmed using two schedules, one associated with each alternative that operate continuously, changing the schedule at one alternative also changes the switch schedule at the other alternative. Thus, changes in responding at the constant alternative could be due to the change in the switch schedule. To assess this possibility, six rats were exposed to a series of conditions that alternated between pairs of interval schedules at both alternatives and a pair of interval schedules at one, constant, alternative and a pair of extinction schedules at the other alternative. Comparing run lengths, visit durations and response rates at the constant alternative in the alternating conditions did not show consistent increases and decreases when a strict criterion for changes was used. Using a less stringent definition (any change in mean values) showed changes. The stay/switch analysis suggests it may be inaccurate to apply behavioral contrast to procedures that change from concurrent variable-interval variable-interval schedules to concurrent variable-interval extinction schedules because the contingencies in neither alternative are constant. © 2017 Society for the Experimental Analysis of Behavior.

  2. 28 CFR 540.62 - Institutional visits.

    Science.gov (United States)

    2010-07-01

    ....62 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT CONTACT WITH PERSONS IN THE COMMUNITY Contact With News Media § 540.62 Institutional visits. (a) A media representative shall make advance appointments for visits. (b) When media representatives visit the institutions...

  3. 42 CFR 409.48 - Visits.

    Science.gov (United States)

    2010-10-01

    ... INSURANCE BENEFITS Home Health Services Under Hospital Insurance § 409.48 Visits. (a) Number of allowable... home health visits. All Medicare home health services are covered under hospital insurance unless there... 42 Public Health 2 2010-10-01 2010-10-01 false Visits. 409.48 Section 409.48 Public Health CENTERS...

  4. Joint opportunistic scheduling and network coding for bidirectional relay channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-07-01

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users\\' transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited. © 2013 IEEE.

  5. Proceedings of the scientific visit on crystalline rock repository development.

    Energy Technology Data Exchange (ETDEWEB)

    Mariner, Paul E.; Hardin, Ernest L.; Miksova, Jitka [RAWRA, Czech Republic

    2013-02-01

    A scientific visit on Crystalline Rock Repository Development was held in the Czech Republic on September 24-27, 2012. The visit was hosted by the Czech Radioactive Waste Repository Authority (RAWRA), co-hosted by Sandia National Laboratories (SNL), and supported by the International Atomic Energy Agency (IAEA). The purpose of the visit was to promote technical information exchange between participants from countries engaged in the investigation and exploration of crystalline rock for the eventual construction of nuclear waste repositories. The visit was designed especially for participants of countries that have recently commenced (or recommenced) national repository programmes in crystalline host rock formations. Discussion topics included repository programme development, site screening and selection, site characterization, disposal concepts in crystalline host rock, regulatory frameworks, and safety assessment methodology. Interest was surveyed in establishing a %E2%80%9Cclub,%E2%80%9D the mission of which would be to identify and address the various technical challenges that confront the disposal of radioactive waste in crystalline rock environments. The idea of a second scientific visit to be held one year later in another host country received popular support. The visit concluded with a trip to the countryside south of Prague where participants were treated to a tour of the laboratory and underground facilities of the Josef Regional Underground Research Centre.

  6. Swiss State Secretary visits CERN

    CERN Multimedia

    2008-01-01

    The new Swiss State Secretary for Education and Research recently visited CERN. Peter Jenni, the spokesperson for ATLAS, gave Mauro Dell’Ambrogio, the new Swiss State Secretary for Education and Research, a tour of ATLAS and the LHC tunnel.On 2 April, the newly appointed Swiss State Secretary for Education and Research, Mauro Dell’Ambrogio, was welcomed to CERN by Director-General Robert Aymar. On arrival the Swiss minister was given a guided tour of ATLAS and the adjoining LHC tunnel by Peter Jenni, the ATLAS spokesperson. Dr Dell’Ambrogio was then greeted by Swiss scientists and attended presentations by young post doc physicists about Swiss contributions to CMS and LHCb, in particular their work concerning hardware contribution and data analysis. There are 120 physicists from Swiss universities working on CERN’s experiments, and many more Swiss people working at CERN in other departments due to Switzerland’s special position as a host state. Also before ...

  7. Visits to La Plata Observatory

    Science.gov (United States)

    Feinstein, A.

    1985-03-01

    La Plata Observatory will welcome visitors to ESO-La Silla that are willing to make a stop at Buenos Aires on their trip to Chile or on their way back. There is a nice guesthouse at the Observatory that can be used, for a couple of days or so, by astronomers interested in visiting the Observatory and delivering talks on their research work to the Argentine colleagues. No payments can, however, be made at present. La Plata is at 60 km from Buenos Aires. In the same area lie the Instituto de Astronomia y Fisica dei Espacio (IAFE), in Buenos Aires proper, and the Instituto Argentino de Radioastronomia (IAR). about 40 km from Buenos Aires on the way to La Plata. Those interested should contacl: Sr Decano Prof. Cesar A. Mondinalli, or Dr Alejandro Feinstein, Observatorio Astron6mico, Paseo dei Bosque, 1900 La Plata, Argentina. Telex: 31216 CESLA AR.

  8. 77 FR 32433 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2012-06-01

    ... 1703 Proposed FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice... Defense Nuclear Facilities Safety Board is publishing its proposed Freedom of Information Act (FOIA) Fee.... on or before July 2, 2012. ADDRESSES: Comments on the proposed fee schedule should be mailed or...

  9. Simultaneous optimization of planning and scheduling in an oil refinery

    NARCIS (Netherlands)

    Zondervan, E.; van Boekel, T.P.J.; Fransoo, J.C.; Haan, de A.B.; Postikopoulos, E.N.; Georgiadis, M.C.; Kokossis, A.

    2011-01-01

    In earlier work we have developed and tested a scheduling model [1] in the AIMMS software. In this follow-up contribution we will develop a planning model. Next we will identify the information flow between scheduling model and the planning model. Lastly we will integrate the two models in a

  10. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  11. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  12. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  13. 10,000th teacher visits CERN

    CERN Multimedia

    Kathryn Coldham

    2016-01-01

    This year, the 10,000th teacher will visit CERN since its first teacher programme in 1998.   HST 2016 teachers with CERN Director-General Fabiola Gianotti in the CERN Council Chamber. (Image: Maximilien Brice/CERN) This summer, CERN welcomed the 10,000th teacher to participate in one of its teacher programmes! This milestone was achieved in this year’s International High School Teacher (HST) programme, a three-week residential programme that saw 48 enthusiastic teachers flock from all over the world to help inspire young minds. Taking place every July since 1998, the HST programme aims to increase teachers’ knowledge on the cutting-edge particle physics research currently being carried out at CERN. It also opens up a whole new world of educational resources available for use by the teachers to inspire their students’ curious young minds. More information is available here.

  14. Real-time subway information for improving transit ridership.

    Science.gov (United States)

    2016-08-01

    In recent years, the standardization of transit schedule information has yielded a dramatic increase in the accessibility of computerized transit schedules and given rise to real-time service schedules. Two such real-time service schedules are the Ge...

  15. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  16. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  17. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  18. The influence of nurse home visits, including provision of 3 months of contraceptives and contraceptive counseling, on perceived barriers to contraceptive use and contraceptive use self-efficacy.

    Science.gov (United States)

    Melnick, Alan L; Rdesinski, Rebecca E; Creach, E Dawn; Choi, Dongseok; Harvey, S Marie

    2008-01-01

    To identify the influence of a community health nurse (CHN) home visit on perceived barriers to contraceptive access and contraceptive use self-efficacy. We enrolled 103 women into two groups in a randomized trial evaluating the influence of contraceptive dispensing and family planning counseling during home visits on perceived barriers to accessing contraceptives and contraceptive use self-efficacy. Both groups received counseling by a CHN about sexually transmitted disease and pregnancy prevention, and a resource card listing phone numbers of family planning clinics. After randomization, the CHN dispensed three months of hormonal contraception to the intensive intervention group and advised the minimal intervention group to schedule an appointment at a family planning clinic. Data collection at baseline and 12 months included demographic, reproductive and other health-related information as well as quantitative assessments of information on perceived barriers to contraceptive access and contraceptive use self-efficacy. The mean age of participants was 24.7 years. Three-fourths had household incomes under $25,000. We found significant reductions in three perceived barriers to contraceptive access for both groups, as well as significant increases in two measures of contraceptive use self-efficacy at twelve months compared to baseline. Nurse home visits involving family planning counseling might be effective in reducing perceived barriers to contraceptive access and increasing contraceptive use self-efficacy.

  19. 42 CFR 85.6 - Advance notice of visits.

    Science.gov (United States)

    2010-10-01

    ... investigation. Advance notice will not be given when, in the judgment of the NIOSH officer, giving such notice..., advance notice will be given by NIOSH to the employer. Upon the request of the employer, NIOSH will inform... 42 Public Health 1 2010-10-01 2010-10-01 false Advance notice of visits. 85.6 Section 85.6 Public...

  20. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  1. Scheduling Broadcasts in a Network of Timelines

    KAUST Repository

    Manzoor, Emaad A.

    2015-05-12

    Broadcasts and timelines are the primary mechanism of information exchange in online social platforms today. Services like Facebook, Twitter and Instagram have enabled ordinary people to reach large audiences spanning cultures and countries, while their massive popularity has created increasingly competitive marketplaces of attention. Timing broadcasts to capture the attention of such geographically diverse audiences has sparked interest from many startups and social marketing gurus. However, formal study is lacking on both the timing and frequency problems. In this thesis, we introduce, motivate and solve the broadcast scheduling problem of specifying the timing and frequency of publishing content to maximise the attention received. We validate and quantify three interacting behavioural phenomena to parametrise social platform users: information overload, bursty circadian rhythms and monotony aversion, which is defined here for the first time. Our analysis of the influence of monotony refutes the common assumption that posts on social network timelines are consumed piecemeal independently. Instead, we reveal that posts are consumed in chunks, which has important consequences for any future work considering human behaviour over social network timelines. Our quantification of monotony aversion is also novel, and has applications to problems in various domains such as recommender list diversification, user satiation and variety-seeking consumer behaviour. Having studied the underlying behavioural phenomena, we link schedules, timelines, attention and behaviour by formalising a timeline information exchange process. Our formulation gives rise to a natural objective function that quantifies the expected collective attention an arrangement of posts on a timeline will receive. We apply this formulation as a case-study on real-data from Twitter, where we estimate behavioural parameters, calculate the attention potential for different scheduling strategies and, using the

  2. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    . The rostering process is non-trivial and especially when service is required around the clock, rostering may involve considerable effort from a designated planner. Therefore, in order to minimize costs and overstaffing, to maximize the utilization of available staff, and to ensure a high level of satisfaction...... as possible to the available staff, while respecting various requirements and rules and while including possible transportation time between tasks. This thesis presents a number of industrial applications in rostering and task scheduling. The applications exist within various contexts in health care....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied...

  3. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  4. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  5. USEPA QUALITY ASSURANCE AUDITOR IS SCHEDULED FOR A VISIT. WHAT CAN I EXPECT?

    Science.gov (United States)

    Environmental studies involving data collection activities conducted by or for the United States Environmental Protection Agency (USEPA) are required to undergo a review of their data collection activities. his review is usually in the form of an independent quality assurance (QA...

  6. Consumers' price knowledge before, during, and after store visit

    DEFF Research Database (Denmark)

    Jensen, Birger Boutrup

    Many attempts have been made to measure consumers' price knowledge for frequently purchased goods. However, the results have varied considerably and conflict with the results of reference price studies. This is the first study to examine consumers' price knowledge before, during, and after store...... visit, thus enabling a study of what consumers learn about prices during the store visit, and consequently the relationship between reference prices and episodic price knowledge. The project applies three measures of consumers' price knowledge corresponding to different levels of price information...

  7. Weighted-SNR-based fair scheduling for uplink OFDMA

    KAUST Repository

    Ma, Yao; Leith, Alex; Alouini, Mohamed-Slim; (Sherman) Shen X., Xuemin

    2009-01-01

    rates for different users. The offline optimization technique requires to know the channel distribution information (CDI) at the scheduler. The online method uses the weight adaption combined with individual user rate tracking, which avoids the need

  8. Designing a data-driven decision support tool for nurse scheduling in the emergency department: a case study of a southern New Jersey emergency department.

    Science.gov (United States)

    Otegbeye, Mojisola; Scriber, Roslyn; Ducoin, Donna; Glasofer, Amy

    2015-01-01

    A health system serving Burlington and Camden Counties, New Jersey, sought to improve labor productivity for its emergency departments, with emphasis on optimizing nursing staff schedules. Using historical emergency department visit data and operating constraints, a decision support tool was designed to recommend the number of emergency nurses needed in each hour for each day of the week. The pilot emergency department nurse managers used the decision support tool's recommendations to redeploy nurse hours from weekends into a float pool to support periods of demand spikes on weekdays. Productivity improved significantly, with no unfavorable impact on patient throughput, and patient and staff satisfaction. Today's emergency department manager can leverage the increasing ease of access to the emergency department information system's data repository to successfully design a simple but effective tool to support the alignment of its nursing schedule with demand patterns. Copyright © 2015 Emergency Nurses Association. Published by Elsevier Inc. All rights reserved.

  9. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  10. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  11. Informe de la Visita a la Universidade Estadual de Campinas (Unicamp Campinas, Estado de São Paulo, Brasil 2 al 4 de octubre de 2000 = Report of the Visit to the Universidade Estadual de Campinas (UnicampCampinas, Estado de São Paulo, Brazil 2 to 4 October 2000

    Directory of Open Access Journals (Sweden)

    Nancy Diana Gómez

    2001-06-01

    Full Text Available En el marco del convenio entre la Universidad de Campinas y la Universidad de Buenos Aires, efectuamos una visita a la UNICAMP formando parte de una comisión, integrada por 6 miembros, representantes de distintas áreas de investigación y de información de la Facultad. El presente trabajo pretende trasladar la experiencia adquirida, en la visita al Sistema de Bibliotecas de la Universidad de Campinas. Poniendo especial atención en la cultura de trabajo cooperativo, desarrollo de consorcios, siendo estas dos herramientas fundamentales, para lograr un mejor aprovechamiento de los recursos disponibles en la gestión de la información = In the framework of the agreement between the Universidad de Campinas and the University of Buenos Aires, we visited the UNICAMP, as a part of a six members commission representing various areas of research and information management of the Faculty. The present work aims at implementing the experience gathered during the visit to the Library System of Universidad de Campinas. We pay special attention to issues concerning “culture of cooperative work” and “development of consortiums”, which we consider two key tools for achieving a better utilization of the available resources in the management of information.

  12. A systematic review of nonsurgical single-visit versus multiple-visit endodontic treatment

    Directory of Open Access Journals (Sweden)

    Wong AWY

    2014-05-01

    Full Text Available Amy WY Wong, Chengfei Zhang, Chun-hung Chu Faculty of Dentistry, The University of Hong Kong, Hong Kong Special Administrative Region, People's Republic of China Abstract: Conventional endodontic treatment used to require multiple visits, but some clinicians have suggested that single-visit treatment is superior. Single-visit endodontic treatment and multiple-visit endodontic treatment both have their advantages and disadvantages. This paper is a literature review of the research on nonsurgical single-visit versus multiple-visit endodontic treatment. The PubMed database was searched using the keywords (endodontic treatment OR endodontic therapy OR root canal treatment OR root canal therapy AND (single-visit OR one-visit OR 1-visit. Review papers, case reports, data studies, and irrelevant reports were excluded, and 47 papers on clinical trials were reviewed. The studies generally had small sample sizes, and the endodontic procedures varied among the studies. Meta-analysis on the selected studies was performed, and the results showed that the postoperative complications of the single-visit and multiple-visit endodontic treatment were similar. Furthermore, neither single-visit endodontic treatment nor multiple-visit treatment had superior results over the other in terms of healing or success rate. Results of limited studies on disinfection of the root canals using low-energy laser photodynamic therapy is inconclusive, and further studies are necessary to show whether laser should be used in endodontic treatment. This review also found that that neither single-visit endodontic treatment nor multiple-visit treatment could guarantee the absence of postoperative pain. Since the study design of many studies displayed significant limitation and the materials and equipment used in endodontic treatment have dramatically changed in recent years, prospective randomized clinical trials are needed to further verify the postoperative pain and success rates of

  13. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  14. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  15. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  16. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  17. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  18. IAEA Director General to visit Libya

    International Nuclear Information System (INIS)

    2003-01-01

    Full text: Dr. Mohamed ElBaradei announced today that he will visit the Libyan Arab Jamahiriya (Libya) in the immediate future with a team of senior IAEA technical experts. 'The purpose of my visit will be to initiate an in-depth process of verification of all of Libya's past and present nuclear activities', Dr. ElBaradei said in a news conference. 'We shall define the corrective actions that need to be taken and consult on the necessary steps to eliminate any weapons related activities.' The announcement follows a meeting held in Vienna on 20 December 2003 between Dr. ElBaradei and H.E. Engineer Matooq Mohamed Matooq, Assistant Secretary for Services Affairs of the General People's Committee of Libya. In that meeting, Mr. Matooq informed Dr. ElBaradei of Libya's decision to eliminate 'materials, equipments and programmes which lead to the production of internationally proscribed weapons'. The Agency was also informed that Libya had been engaged for more than a decade in the development of a uranium enrichment capability. This included importing natural uranium and centrifuge and conversion equipment and the construction of now dismantled pilot scale centrifuge facilities. Some of these activities should have been, but were not, reported to the IAEA under Libya's Safeguards Agreement with the IAEA. Mr. Matooq stated, however, that Libya's nuclear enrichment programme was at an early stage of development and that no industrial scale facility had been built, nor any enriched uranium produced. Libya has asked the IAEA to ensure through verification that all of Libya's nuclear activities will henceforth be under safeguards and exclusively for peaceful purposes. In that regard, Libya has agreed to take the necessary steps to conclude an Additional Protocol to its NPT Safeguards Agreement, which will provide the IAEA with broader inspection rights, and to pursue with the IAEA a policy of full transparency and active co-operation. Dr. ElBaradei said, 'Libya's decision to

  19. Notes on collecting flower-visiting insects

    NARCIS (Netherlands)

    Willemstein, S.C.

    1974-01-01

    Flower-visiting insects may play a role in the pollination of the flowers they visit. An important indication for this is the pollen they carry on their body. The transport of pollen does not prove pollination without observations of the behaviour of the insects on the flowers, but at least it

  20. Child-Visiting and Domestic Abuse.

    Science.gov (United States)

    Shepard, Melanie

    1992-01-01

    Explains problems with child visiting in cases of domestic abuse. Data on domestic abuse, child care concerns, and child adjustment problems were collected from 25 mothers and 22 fathers at a child visiting program serving separated and abusive families. Psychological abuse of mothers correlated with child adjustment problems. (BB)

  1. An examination of constraints to wilderness visitation

    Science.gov (United States)

    Gary T. Green; J. Michael Bowker; Cassandra Y. Johnson; H. Ken Cordell; Xiongfei Wang

    2007-01-01

    Certain social groups appear notably less in wilderness visitation surveys than their population proportion. This study examines whether different social groups in American society (minorities, women, rural dwellers, low income and less educated populations) perceive more constraints to wilderness visitation than other groups. Logistic regressions were fit to data from...

  2. Virtual baby visit going mobile

    NARCIS (Netherlands)

    Rutkowski, A.F.; Spanjers, R.W.L.; Genuchten, van M.J.I.M.; Jarvenpaa, S.; Saarinen, T.; Tuunainen, V.K.

    2006-01-01

    Applications of Information Technologies (ITs) are increasing in the healthcare domain. ITs have been proven to be a support for the dissemination of knowledge and training amongst specialists in the use of computer-aided surgery [2]. The development of new technologies advances care opportunities

  3. Calorie labeling, fast food purchasing and restaurant visits.

    Science.gov (United States)

    Elbel, Brian; Mijanovich, Tod; Dixon, L Beth; Abrams, Courtney; Weitzman, Beth; Kersh, Rogan; Auchincloss, Amy H; Ogedegbe, Gbenga

    2013-11-01

    Obesity is a pressing public health problem without proven population-wide solutions. Researchers sought to determine whether a city-mandated policy requiring calorie labeling at fast food restaurants was associated with consumer awareness of labels, calories purchased and fast food restaurant visits. Difference-in-differences design, with data collected from consumers outside fast food restaurants and via a random digit dial telephone survey, before (December 2009) and after (June 2010) labeling in Philadelphia (which implemented mandatory labeling) and Baltimore (matched comparison city). Measures included: self-reported use of calorie information, calories purchased determined via fast food receipts, and self-reported weekly fast-food visits. The consumer sample was predominantly Black (71%), and high school educated (62%). Postlabeling, 38% of Philadelphia consumers noticed the calorie labels for a 33% point (P < 0.001) increase relative to Baltimore. Calories purchased and number of fast food visits did not change in either city over time. While some consumers report noticing and using calorie information, no population level changes were noted in calories purchased or fast food visits. Other controlled studies are needed to examine the longer term impact of labeling as it becomes national law. Copyright © 2013 The Obesity Society.

  4. Inclusion of Visually Impaired in the School Programme Scheduled Visit of the Museu de Astronomia e Ciências Afins (MAST). (Breton Title: Inclusão de Deficientes Visuais no Programa de Visita Escolar Programada do Museu de Astronomia e Ciências Afins (MAST).) Inclusión de Discapacitados Visuales en el Programa Escolar Programado del Museo de Astronomía y Ciencias Afines (MAST)

    Science.gov (United States)

    de Oliveira Gonçalves, Carla; da Conceição Barbosa-Lima, Maria

    2013-07-01

    Inclusive Education in Brazil, contemplated in the 1988 Constitution and in the Law of Guidelines and Bases of National Education (9.394/96) highlights the importance and urgency of promoting inclusive education as a formative element of nationality. Inclusive Education refers to all people who are struggling in school. Inclusion should be in all educational institutions (formal and informal). Our goal in the graduation final task was to report the experience of mediation to visually impaired students of the Instituto Benjamin Constant (IBC) at the Museu de Astronomia e Ciências Afins (MAST), and also suggest some modifications and present new proposals for the School Visit Program (VEP) through a specially constructed apparatus, where the sky can be sensed near the latitude of Rio de Janeiro. A educação inclusiva no Brasil, contemplada na Constituição de 1988 e a Lei de Diretrizes e Bases da Educação Nacional (9.394/96), destaca a importância e urgência de se promover a inclusão escolar como elemento formador da nacionalidade. A educação inclusiva diz respeito a todas as pessoas que enfrentam dificuldades na escola. A inclusão deve estar em todas as instituições educacionais (formais e não formais). Nosso objetivo, no trabalho de final de curso de licenciatura, foi apresentar o relato de experiência de mediação aos alunos deficientes visuais do Instituto Benjamin Constant (IBC) no Museu de Astronomia e Ciências Afins (MAST), as modificações e novas propostas para o Programa de Visita Escolar Programada (VEP) através de um aparelho especialmente construído onde se pode perceber o céu na latitude próxima a do Rio de Janeiro. La educación inclusiva en el Brasil, contemplada en la Constitución de 1988 y en la Ley de Directrices y Bases de la Educación Nacional (9.394/96), destaca la importancia y la urgencia de promover la inclusión escolar como elemento formador de la nacionalidad. La educación inclusiva se refiere a todas las personas

  5. A decentralized scheduling algorithm for time synchronized channel hopping

    Directory of Open Access Journals (Sweden)

    Andrew Tinka

    2011-09-01

    Full Text Available Time Synchronized Channel Hopping (TSCH is an existing Medium Access Control scheme which enables robust communication through channel hopping and high data rates through synchronization. It is based on a time-slotted architecture, and its correct functioning depends on a schedule which is typically computed by a central node. This paper presents, to our knowledge, the first scheduling algorithm for TSCH networks which both is distributed and which copes with mobile nodes. Two variations on scheduling algorithms are presented. Aloha-based scheduling allocates one channel for broadcasting advertisements for new neighbors. Reservation- based scheduling augments Aloha-based scheduling with a dedicated timeslot for targeted advertisements based on gossip information. A mobile ad hoc motorized sensor network with frequent connectivity changes is studied, and the performance of the two proposed algorithms is assessed. This performance analysis uses both simulation results and the results of a field deployment of floating wireless sensors in an estuarial canal environment. Reservation-based scheduling performs significantly better than Aloha-based scheduling, suggesting that the improved network reactivity is worth the increased algorithmic complexity and resource consumption.

  6. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH

    Directory of Open Access Journals (Sweden)

    Sukho Oh

    2018-04-01

    Full Text Available Time Slotted Channel Hopping (TSCH is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  7. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH.

    Science.gov (United States)

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-04-16

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  8. Scheduling mammograms for asymptomatic women

    International Nuclear Information System (INIS)

    Gohagan, J.K.; Darby, W.P.; Spitznagel, E.L.; Tome, A.E.

    1988-01-01

    A decision theoretic model was used to investigate the relative importance of risk level, radiation hazard, mammographic accuracy, and cost in mammographic screening decision. The model uses woman-specific medical and family history facts and clinic-specific information regarding mammographic accuracy and practice to profile both woman and clinic, and to formulate periodic screening recommendations. Model parameters were varied extensively to investigate the sensitivity of screening schedules to input values. Multivariate risk was estimated within the program using published data from the Breast Cancer Detection Demonstration Project 5-year follow-up study. Radiation hazard estimates were developed from published radiation physics and radioepidemiologic risk data. Benchmark values for mammographic sensitivity and specificity under screening conditions were calculated from Breast Cancer Detection Demonstration Project data. Procedural costs used in the analysis were varied around values reflecting conditions at the Washington University Medical Center. Mortality advantages of early versus late breast cancer detection were accounted for using Health Insurance Plan of New York case survival rates. Results are compared with published screening policies to provide insight into implicit assumptions behind those policies. This analysis emphasizes the importance of accounting for variations in clinical accuracy under screening circumstances, in costs, in radiation exposure, and in woman-specific risk when recommending mammographic screening

  9. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  10. Are Low Patient Satisfaction Scores Always Due to the Provider?: Determinants of Patient Satisfaction Scores During Spine Clinic Visits.

    Science.gov (United States)

    Bible, Jesse E; Shau, David N; Kay, Harrison F; Cheng, Joseph S; Aaronson, Oran S; Devin, Clinton J

    2018-01-01

    A prospective study. The aim of this study was to investigate the impact of various components on patient satisfaction scores SUMMARY OF BACKGROUND DATA.: Patient satisfaction has become an important component of quality assessments. However, with many of these sources collecting satisfaction data reluctant to disclose detailed information, little remains known about the potential determinants of patient satisfaction. Two hundred patients were contacted via phone within 3 weeks of new patient encounter with 11 spine providers. Standardized patient satisfaction phone survey consisting of 25 questions (1-10 rating scale) was administered. Questions inquired about scheduling, parking, office staff, teamwork, wait-time, radiology, provider interactions/behavior, treatment, and follow-up communication. Potential associations between these factors and three main outcome measures were investigated: (1) provider satisfaction, (2) overall clinic visit satisfaction, and (3) quality of care. Significant associations (P  0.05).In multivariate regression analysis, explanation of medical condition/treatment (P = 0.002) and provider empathy (P = 0.04) were significantly associated with provider satisfaction scores, while the amount of time spent with the provider was not. Conversely, teamwork of staff/provider and follow-up communication were significantly associated with both overall clinic visit satisfaction and quality of care (P ≤ 0.03), while provider behaviors or satisfaction were not. Satisfaction with the provider was associated with better explanations of the spine condition/treatment plan and provider empathy, but was not a significant factor in either overall clinic visit satisfaction or perceived quality of care. Patients' perception of teamwork between staff and providers along with reliable follow-up communication were found to be significant determinants of overall patient satisfaction and perceived quality of care. 3.

  11. 18 CFR 701.203 - Schedule of fees.

    Science.gov (United States)

    2010-04-01

    ... by the Public Information Officer on the basis of the balance between the benefit to the general public and the cost to the Water Resources Council. (d) Fees shall be limited to recovery of only direct... ORGANIZATION Availability of Information § 701.203 Schedule of fees. (a) The Public Information Officer will to...

  12. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  13. Primary and Secondary Teachers' Ideas on School Visits to Science Centres in the Basque Country

    Science.gov (United States)

    Morentin, Maite; Guisasola, Jenaro

    2015-01-01

    In recent decades, research has shown the challenge posed to teachers by science education in informal contexts such as science museums or centres. In addition, there is consensus that in the case of pupils visiting a science centre, learning improves when the visit is connected to the classroom curriculum, so the teachers' involvement in…

  14. Long-term adherence to daily controller medication in children with asthma : The role of outpatient clinic visits

    NARCIS (Netherlands)

    Keemink, Yvette S.; Klok, Ted; Brand, Paul L. P.

    2015-01-01

    ObjectiveTo investigate changes in inhaled corticosteroids adherence, both before and after a scheduled follow-up visit, in young children in a comprehensive asthma management program. Study designOne-year prospective follow-up study in 104 asthmatic children (mean age 4.8 years). Adherence to

  15. Concurrent variable-interval variable-ratio schedules in a dynamic choice environment.

    Science.gov (United States)

    Bell, Matthew C; Baum, William M

    2017-11-01

    Most studies of operant choice have focused on presenting subjects with a fixed pair of schedules across many experimental sessions. Using these methods, studies of concurrent variable- interval variable-ratio schedules helped to evaluate theories of choice. More recently, a growing literature has focused on dynamic choice behavior. Those dynamic choice studies have analyzed behavior on a number of different time scales using concurrent variable-interval schedules. Following the dynamic choice approach, the present experiment examined performance on concurrent variable-interval variable-ratio schedules in a rapidly changing environment. Our objectives were to compare performance on concurrent variable-interval variable-ratio schedules with extant data on concurrent variable-interval variable-interval schedules using a dynamic choice procedure and to extend earlier work on concurrent variable-interval variable-ratio schedules. We analyzed performances at different time scales, finding strong similarities between concurrent variable-interval variable-interval and concurrent variable-interval variable- ratio performance within dynamic choice procedures. Time-based measures revealed almost identical performance in the two procedures compared with response-based measures, supporting the view that choice is best understood as time allocation. Performance at the smaller time scale of visits accorded with the tendency seen in earlier research toward developing a pattern of strong preference for and long visits to the richer alternative paired with brief "samples" at the leaner alternative ("fix and sample"). © 2017 Society for the Experimental Analysis of Behavior.

  16. Visit of Belgian firms at CERN

    CERN Multimedia

    Caroline Laignel - FI

    2006-01-01

    3 - 4 APRIL 2006 9.00 a.m. to 5.00 p.m. Monday 3 April 9.00 a.m. to 5.00 p.m. Tuesday 4 April Individual interviews will take place in technicians' offices. The firms will contact relevant users/technicians but any user wishing to make contact with a particular firm is welcome to use the contact details which are available from each departmental secretariat or from the Purchasing web pages at the following URL http://fi-dep.web.cern.ch/fi-dep/structure/memberstates/exhibitions_visits.htm List of Companies: Alcatel Alenia Space Etca ALM ATS Vanwers Cegelec SA Cherokee Europe Cincom Systems International SA DB Engineering BVBA FOS & S BVBA GDM Electronics NV Gemaco SA LMS International NV Management Centre Europe MD Technology Mecasoft SA N.E.T. Research Polmans SA Resarm Engineering Plastics SA Sogeti Belux Syreg SA Tein Telecom SA Groupe Vincott For further information please contact Mrs C. Laignel FI-DI 73722.

  17. The Duke of York visits CERN

    CERN Multimedia

    2004-01-01

    The Duke of York chats before inaugurating the UK@CERN exhibition. From left to right: Robert Aymar, CERN's Director General, the Duke of York, and leading UK scientists at CERN: Jim Virdee, CMS deputy spokeman; theorist John Ellis ; and Steve Myers, head of the AB Department. On 23 November, the Duke of York visited CERN and, in his capacity as the UK's Special Representative for International Trade and Investment, inaugurated the UK@CERN Exhibition. This biennial trade show was initially held in 1968, the first such exhibition by a CERN member state. This year 22 companies displayed goods and services that could be of interest to CERN scientists. In his inaugural speech, the Duke emphasized that business between companies and CERN "is a two-way information flow with mutual benefits." The companies make sales but also benefit from technologies that CERN transfers to them. CERN benefits from the exchange, the Duke said, addressing CERN's scientists, because it "frees your time for what you do best: science....

  18. Visiting CERN… like “common people”

    CERN Multimedia

    Antonella del Rosso

    2012-01-01

    Paul Young, the British pop star who made his name in the 80s, came to visit CERN on 17 December. His son brought him here because of his passion for science in general and physics in particular. Father and son found the visit exciting and CERN’s activities really thrilling. We could even expect a surprise for Paul's next visit…   The visiting group in the CMS Control Room (Photo credit: P. Geeraert, ESO). Paul Young, famous for his interpretation of “Love of the Common People”, came to CERN because his teenage son is going to be studying A-level physics at school next year and wanted to visit the Laboratory. “I was fascinated by the visit. CERN is a place I didn’t know much about, but my son knows a lot more about science than I do. The explanations we got were great. We enjoyed the visit very much,” he said enthusiastically. Paul Young and his son visited the CMS underground cavern with Michael Hoch. &...

  19. First tooth, first visit, zero cavities: a practical approach to the infant oral health visit

    LENUS (Irish Health Repository)

    Fitzgerald, Kirsten

    2017-04-01

    The IDA adopted a formal policy on children’s oral health in 2011. There is increasing evidence to support early dental visits for children. The background to the infant oral health visit is discussed and a systematic approach to the practicalities of the visit is offered. General dental practitioners are encouraged to offer the first oral health visit before the first birthday, and this paper aims to give them practical advice concerning this visit. The feature is accompanied by a companion paper that reviews the literature pertaining to the topic, and serves to complement the recent clinical feature published in the Journal of the Irish Dental Association.

  20. Multiuser Scheduling on the Downlink of an LTE Cellular System

    Directory of Open Access Journals (Sweden)

    Raymond Kwan

    2008-01-01

    Full Text Available The challenge of scheduling user transmissions on the downlink of a long-term evolution (LTE cellular communication system is addressed. In particular, a novel optimalmultiuser scheduler is proposed. Numerical results show that the system performance improves with increasing correlation among OFDMA subcarriers. It is found that only a limited amount of feedback information is needed to achieve relatively good performance. A suboptimal reduced-complexity scheduler is also proposed and shown to provide good performance. The suboptimal scheme is especially attractive when the number of users is large, in which case the complexity of the optimal scheme is high.

  1. Sensor Transmission Power Schedule for Smart Grids

    Science.gov (United States)

    Gao, C.; Huang, Y. H.; Li, J.; Liu, X. D.

    2017-11-01

    Smart grid has attracted much attention by the requirement of new generation renewable energy. Nowadays, the real-time state estimation, with the help of phasor measurement unit, plays an important role to keep smart grid stable and efficient. However, the limitation of the communication channel is not considered by related work. Considering the familiar limited on-board batteries wireless sensor in smart grid, transmission power schedule is designed in this paper, which minimizes energy consumption with proper EKF filtering performance requirement constrain. Based on the event-triggered estimation theory, the filtering algorithm is also provided to utilize the information contained in the power schedule. Finally, its feasibility and performance is demonstrated using the standard IEEE 39-bus system with phasor measurement units (PMUs).

  2. Patient Satisfaction and its Relation to Perceived Visit Duration With a Hand Surgeon.

    Science.gov (United States)

    Parrish, Raymond C; Menendez, Mariano E; Mudgal, Chaitanya S; Jupiter, Jesse B; Chen, Neal C; Ring, David

    2016-02-01

    To determine whether patient perception of time spent with a hand surgeon relates to patient satisfaction after a single new-patient office visit. Prior to each visit, 112 consecutive new patients predicted how much time they expected to spend with the surgeon. Following the visit, patients were asked to estimate the time spent with the surgeon, indicate whether the surgeon appeared rushed, and rate their overall satisfaction with the surgeon. Wait time and actual visit duration were measured. Patients also completed a sociodemographic survey, the Consultation and Relational Empathy Measure, the Newest Vital Sign Health Literacy test, and 3 Patient-Reported Outcomes Measurement Information System-based questionnaires: Upper Extremity Function, Pain Interference, and Depression. Multivariable logistic and linear regression models were used to determine predictors of patient satisfaction, patient-perceived surgeon rush, and high previsit expectations of visit duration. Patient satisfaction was not associated with perceived visit duration but did correlate strongly with patient-rated surgeon empathy and symptoms of depression. Neither visit duration nor previsit expectations of visit length were determinants of patient-perceived surgeon rush. Only surgeon empathy was associated. Less-educated patients anticipated needing more time with the surgeon. Patient satisfaction with the surgeon and with the time spent during the office visit was primarily linked to surgeon empathy rather than to visit duration or previsit expectation of visit length. Efforts to make hand surgery office visits more patient-centered should focus on improving dialogue quality, and not necessarily on making visits longer. Copyright © 2016 American Society for Surgery of the Hand. Published by Elsevier Inc. All rights reserved.

  3. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  4. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  5. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  6. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  7. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  8. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  9. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    Science.gov (United States)

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout

  10. 12 CFR 404.16 - Schedule of fees.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Schedule of fees. 404.16 Section 404.16 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES INFORMATION DISCLOSURE Access to Records Under the Privacy Act of 1974 § 404.16 Schedule of fees. (a) Search and review. Ex-Im Bank shall not charge for...

  11. Max Weber Visits America: A Review of the Video

    OpenAIRE

    Michael Wise

    2006-01-01

    The North Carolina Sociological Society is proud to announce the long-awaited video of Max Weber's trip to North Carolina as retold by two of his cousins. Max Weber made a trip to visit relatives in Mount Airy, North Carolina, in 1904. This 2004 narrative by Larry Keeter and Stephen Hall is the story of locating and interviewing two living eyewitnesses (1976) to Max Weber's trip. The video includes information about Weber's contributions to modern sociology. Dowloadable files are provided...

  12. Visits Service Launches New Seminar Series

    CERN Multimedia

    2001-01-01

    The CERN Visits Service is launching a new series of seminars for guides, and they are open to everyone. The series kicks off next week with a talk by Konrad Elsener on the CERN neutrinos to Gran Sasso, CNGS, project.

  13. UK school visit: Alfriston School for girls

    CERN Multimedia

    Sophie Louise Hetherton

    2014-01-01

    Pupils with learning disabilities from Alfriston School in the UK visited the CMS detector last week. This visit was funded by the UK's Science and Technologies Facilities Council (STFC) as part of a grant awarded to support activities that will help to build the girls’ self-esteem and interest in physics.   Alfriston School students at CMS. On Friday, 10 October, pupils from Alfriston School – a UK secondary school catering for girls with a wide range of special educational needs and disabilities – paid a special visit to CERN. Dave Waterman, a science teacher at the school, recently received a Public Engagement Small Award from the STFC, which enabled the group of girls and accompanying teachers to travel to Switzerland and visit CERN. The awards form part of a project to boost the girls’ confidence and interest in physics. The aim is to create enthusiastic role models with first-hand experience of science who can inspire their peers back hom...

  14. Darwin-Bali Exchange School Visits

    Science.gov (United States)

    Stone, T.

    1974-01-01

    Describes an exchange program between Indonesian language students and teachers from Darwin and a group of students and teachers from Bali. The visits related to the subject areas of history, geography, Asian studies, and Bahasa Indonesia. (RM)

  15. VIP visit of LHC Computing Grid Project

    CERN Multimedia

    Krajewski, Yann Tadeusz

    2015-01-01

    VIP visit of LHC Computing Grid Project with Dr -.Ing. Tarek Kamel [Senior Advisor to the President for Government Engagement, ICANN Geneva Office] and Dr Nigel Hickson [VP, IGO Engagement, ICANN Geneva Office

  16. Designing of Vague Logic Based 2-Layered Framework for CPU Scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-01-01

    Full Text Available Fuzzy based CPU scheduler has become of great interest by operating system because of its ability to handle imprecise information associated with task. This paper introduces an extension to the fuzzy based round robin scheduler to a Vague Logic Based Round Robin (VBRR scheduler. VBRR scheduler works on 2-layered framework. At the first layer, scheduler has a vague inference system which has the ability to handle the impreciseness of task using vague logic. At the second layer, Vague Logic Based Round Robin (VBRR scheduling algorithm works to schedule the tasks. VBRR scheduler has the learning capability based on which scheduler adapts intelligently an optimum length for time quantum. An optimum time quantum reduces the overhead on scheduler by reducing the unnecessary context switches which lead to improve the overall performance of system. The work is simulated using MATLAB and compared with the conventional round robin scheduler and the other two fuzzy based approaches to CPU scheduler. Given simulation analysis and results prove the effectiveness and efficiency of VBRR scheduler.

  17. Routing and Scheduling Optimization Model of Sea Transportation

    Science.gov (United States)

    barus, Mika debora br; asyrafy, Habib; nababan, Esther; mawengkang, Herman

    2018-01-01

    This paper examines the routing and scheduling optimization model of sea transportation. One of the issues discussed is about the transportation of ships carrying crude oil (tankers) which is distributed to many islands. The consideration is the cost of transportation which consists of travel costs and the cost of layover at the port. Crude oil to be distributed consists of several types. This paper develops routing and scheduling model taking into consideration some objective functions and constraints. The formulation of the mathematical model analyzed is to minimize costs based on the total distance visited by the tanker and minimize the cost of the ports. In order for the model of the problem to be more realistic and the cost calculated to be more appropriate then added a parameter that states the multiplier factor of cost increases as the charge of crude oil is filled.

  18. Transportation cost of anticoagulation clinic visits in an urban setting.

    Science.gov (United States)

    Hwang, Jamie M; Clemente, Jennifer; Sharma, Krishna P; Taylor, Thomas N; Garwood, Candice L

    2011-10-01

    Patients being managed on warfarin make frequent or regular visits to anticoagulation monitoring appointments. International studies have evaluated transportation cost and associated time related to anticoagulation clinic visits. To our knowledge, no studies have evaluated the cost of transportation to such clinic visits in the United States. To describe the methods of transportation and estimate the average total cost of transportation to and from an anticoagulation clinic in an urban setting. We prospectively conducted a survey of patients treated at the Harper Anticoagulation Clinic located in Detroit, Michigan, during November 2010. The survey was given to patients while waiting at their regularly scheduled clinic appointments and included questions regarding mode of transportation, distance traveled in miles, parking payment, and time missed from work for clinic appointments. The mean distance traveled was translated into cost assuming 50 cents per mile based on 2010 estimates by the Internal Revenue Service. Sixty patients responded to the 11-item survey; response rates for individual items varied because participants were instructed to skip questions that did not pertain to them. Of the 47 participants responding to demographic questions, 70.2% were female, and 46.8% were older than 60 years. Transportation by private vehicle (80.0%), either driven by patients (41.7%) or someone else (38.3%), was the most common method reported. Use of private automobile translated into a cost of $11.19 per round trip. Other means of transportation identified include a ride from a medical transportation service (10.0%), bus (5.0%), walking (3.3%), and taxi (1.7%). The mean (SD) distance traveled to the clinic for all methods of transportation was 8.34 (7.7) miles. We estimated the average cost of round-trip transportation to be $10.78 weighted for all transportation modes. This is a direct nonmedical cost that is paid for by most patients out of pocket. However, 9 of 44 (20

  19. 6th July 2010 - United Kingdom Science and Technology Facilities Council W. Whitehorn signing the guest book with Head of International relations F. Pauss, visiting the Computing Centre with Information Technology Department Head Deputy D. Foster, the LHC superconducting magnet test hall with Technology Department P. Strubin,the Centre Control Centre with Operation Group Leader M. Lamont and the CLIC/CTF3 facility with Project Leader J.-P. Delahaye.

    CERN Multimedia

    Teams : M. Brice, JC Gadmer

    2010-01-01

    6th July 2010 - United Kingdom Science and Technology Facilities Council W. Whitehorn signing the guest book with Head of International relations F. Pauss, visiting the Computing Centre with Information Technology Department Head Deputy D. Foster, the LHC superconducting magnet test hall with Technology Department P. Strubin,the Centre Control Centre with Operation Group Leader M. Lamont and the CLIC/CTF3 facility with Project Leader J.-P. Delahaye.

  20. [The impact of the visit of nursing on the necessities of the host families of ICU].

    Science.gov (United States)

    Simoni, Rosemary Cristina Marques; Silva, Maria Júlia Paes da

    2012-10-01

    Study of a quantitative approach that aimed to implement the Visiting Nurse ICU adult and check and meet the main needs for information and verbalized by host families. After approval of the CEP of the HU-USP was asked if the family would like to receive some information on the part of nursing. All family members wanted to receive information from nurses in three visits with each family. The themes of doubt among the most familiar were the patient's clinical state and discharged from the ICU. We found that the average number of questions decreased from the first to third visit. The Visiting Nurse attended the main needs of the host family information and answering your questions about the nursing care provided to patients. It was also observed that the doubts and anxieties of family members decreased during the day, emphasizing the need that contact of Nurses and Families.

  1. Case scheduling preferences of one Surgeon's cataract surgery patients.

    Science.gov (United States)

    Dexter, Franklin; Birchansky, Lee; Bernstein, James M; Wachtel, Ruth E

    2009-02-01

    The increase in the number of operating rooms nationwide in the United States may reflect preferences of patients for scheduling of outpatient surgery. Yet, little is known of the importance that patients place on scheduling convenience and flexibility. Fifty cataract surgery patients seen by a surgeon at his main office during a 6-mo period responded to a marketing survey. All the patients had Medicare insurance and supplemental insurance permitting surgery at any facility. A telephone questionnaire included four vignettes describing different choices in the scheduling of cataract surgery. Respondents were asked how far they would be willing to travel for one option instead of another. For example, "Your surgery will be on Thursday in three weeks at 2 pm. You can drink water until 9 am. You arrive at 10 am, because your surgery might start early. If you travel farther, you would arrive at 8 am for 9 am surgery." The median (50th percentile) additional travel time was 60 min (lower 95% confidence bound >or=52 min) for each of four options: to receive care on a day chosen by the patient instead of assigned by the physician, to receive care at a single site instead of both the surgeon's office and a surgery center at a different location, to combine the examination and the surgery into a single visit instead of two visits, and to have surgery in the morning instead of the afternoon. The patients of this ophthalmologist placed a high value on convenience and flexibility in scheduling their surgery. In general, this would be achievable only if many operating rooms were available each morning.

  2. Patients who share transparent visit notes with others: characteristics, risks, and benefits.

    Science.gov (United States)

    Jackson, Sara L; Mejilla, Roanne; Darer, Jonathan D; Oster, Natalia V; Ralston, James D; Leveille, Suzanne G; Walker, Jan; Delbanco, Tom; Elmore, Joann G

    2014-11-12

    Inviting patients to read their primary care visit notes may improve communication and help them engage more actively in their health care. Little is known about how patients will use the opportunity to share their visit notes with family members or caregivers, or what the benefits might be. Our goal was to evaluate the characteristics of patients who reported sharing their visit notes during the course of the study, including their views on associated benefits and risks. The OpenNotes study invited patients to access their primary care providers' visit notes in Massachusetts, Pennsylvania, and Washington. Pre- and post-intervention surveys assessed patient demographics, standardized measures of patient-doctor communication, sharing of visit notes with others during the study, and specific health behaviors reflecting the potential benefits and risks of offering patients easy access to their visit notes. More than half (55.43%, 2503/4516) of the participants who reported viewing at least one visit note would like the option of letting family members or friends have their own Web access to their visit notes, and 21.70% (980/4516) reported sharing their visit notes with someone during the study year. Men, and those retired or unable to work, were significantly more likely to share visit notes, and those sharing were neither more nor less concerned about their privacy than were non-sharers. Compared to participants who did not share clinic notes, those who shared were more likely to report taking better care of themselves and taking their medications as prescribed, after adjustment for age, gender, employment status, and study site. One in five OpenNotes patients shared a visit note with someone, and those sharing Web access to their visit notes reported better adherence to self-care and medications. As health information technology systems increase patients' ability to access their medical records, facilitating access to caregivers may improve perceived health

  3. First dental visit of a child

    Directory of Open Access Journals (Sweden)

    Meera R

    2008-10-01

    Full Text Available Objectives: The aim of the study was to assess the common chief complaints of the Indian children and the average age group at which they report for in their first dental visit. Materials and Methods: A retrospective study was carried out using the case records of 716 children who reported to the postgraduate section of Department of Pediatric dentistry, Meenakshi Ammal Dental College, Chennai, in 2007. The age groups of the children were divided into three categories 0-3 years, 3-6 years and 6-12 years. The various chief complaints were categorised as follows, Orientation to prevention, Routine visit, Deposits / Discoloration, Habits, Unerupted / Missing or Extra Tooth, Pain, Dental caries, Malocclusion, Trauma, others. The average age group and most common complaint at the first dental visit was assessed. A prospective study was done in January 2008, were 215 children were screened. The assessment was made as explained above. Results: Retrospective study Maximum number of children who reported for their first dental visit was between 6-12 years (59.08%. Most common chief complaint for the visit was pain (42.04%. Second common complaint being dental caries (28.49%. Prospective study Maximum number of children who reported for their first dental visit was between 6-12 years (69.77%. Most common chief complaint was dental caries (34.88%. Second common complaint being pain (27.91%. Conclusion: Children report for the first dental visit most commonly only after 6 years and for complaints like pain and dental caries. Orientation to prevention is not considered and preventive dentistry is yet to reach the common population in India.

  4. Risk factors associated with visiting or not visiting the accident & emergency department after a fall.

    Science.gov (United States)

    Scheffer, Alice C; van Hensbroek, Pieter Boele; van Dijk, Nynke; Luitse, Jan S K; Goslings, Johannes C; Luigies, René H; de Rooij, Sophia E

    2013-07-26

    Little is known about the prevalence of modifiable risk factors of falling in elderly persons with a fall-history who do not visit the Accident and Emergency (A&E) Department after one or more falls. The objective of this study was to determine the prevalence of modifiable risk factors in a population that visited the A&E Department after a fall (A&E group) and in a community-dwelling population of elderly individuals with a fall history who did not visit the A&E Department after a fall (non-A&E group). Two cohorts were included in this study. The first cohort included 547 individuals 65 years and older who were visited at home by a mobile fall prevention team. The participants in this cohort had fall histories but did not visit the A&E Department after a previous fall. These participants were age- and gender-matched to persons who visited the A&E Department for care after a fall. All participants were asked to complete the CAREFALL Triage Instrument. The mean number of modifiable risk factors in patients who did not visit the A&E Department was 2.9, compared to 3.8 in the group that visited the A&E Department (pfalling, impaired vision, mood and high risk of osteoporosis were all independently associated with visiting the A&E Department. All modifiable risk factors for falling were found to be shared between community-dwelling elderly individuals with a fall history who visited the A&E Department and those who did not visit the Department, although the prevalence of these factors was somewhat lower in the A&E group. Preventive strategies aimed both at patients presenting to the A&E Department after a fall and those not presenting after a fall could perhaps reduce the number of recurrent falls, the occurrence of injury and the frequency of visits to the A&E Department.

  5. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  6. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  7. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  8. Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.

    Science.gov (United States)

    Gonzalez, Castor

    This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic…

  9. 75 FR 28071 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2010-05-19

    ... authorized for disposal or reduce the retention period of records already authorized for disposal. NARA... this accumulation, agency records managers prepare schedules proposing retention periods for records... information concerning evaluations of enlisted personnel. Included are job ratings as well as information...

  10. Motivators to visit the National Zoological Gardens of South Africa

    Directory of Open Access Journals (Sweden)

    Yolanda Jordaan

    2014-01-01

    Full Text Available Visitors have various motives for visiting a zoo. Information on these motives can be applied by zoo management to make informed decisions when developing a marketing strategy to ensure the success and future relevance of the zoo. This study has aimed to determine whether visitors are motivated to visit the National Zoological Gardens of South Africa for recreational or educational purposes, and whether their motives are geared towards their own benefit (intrinsic motives or to the benefit of others (altruistic motives. The research was conducted by means of a quantitative survey. The results indicate that the respondents view recreational motives as more important than educational motives. In addition, more people visit the zoo to promote the welfare of others (altruistic orientation than to have a self-directed zoo experience (intrinsic orientation. The findings suggest that the management of the zoological parks should ensure that the parks offer activities and experiences of recreational value for visitors. These activities should be communicated to the relevant target markets, in order to attract them to the zoo, which could contribute to the long-term survival and success of the zoo.

  11. Computer-aided resource planning and scheduling for radiological services

    Science.gov (United States)

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  12. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  13. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  14. EU Commissioner for Research, Science and Innovation visits CERN

    CERN Multimedia

    Svetlomir Stavrev

    2015-01-01

    The EU Commissioner for Research, Science and Innovation, Carlos Moedas, visited CERN on 30 January 2015. He was invited by the Director-General to obtain a first-hand impression of some of the world's largest and most complex scientific instruments, just before the eagerly awaited restart of the LHC at record energies.   EU Commissioner Carlos Moedas (first row, fourth from right), accompanied by members of CERN management and researchers involved in the CESSAMag project. The Commissioner was informed about the missions and various activities of CERN, including knowledge transfer and technologies for medical applications. He visited CMS, some of the magnets developed by CERN for SESAME in the framework of the EU co-funded CESSAMag project, and the IT Computing Centre.  The Commissioner encouraged CERN to engage in a European Science Cloud Pilot that could be built on top of existing and highly successful distributed computing initiatives, in some of which CERN played a fu...

  15. Identification of Emergency Department Visits in Medicare Administrative Claims: Approaches and Implications.

    Science.gov (United States)

    Venkatesh, Arjun K; Mei, Hao; Kocher, Keith E; Granovsky, Michael; Obermeyer, Ziad; Spatz, Erica S; Rothenberg, Craig; Krumholz, Harlan M; Lin, Zhenqui

    2017-04-01

    definitions including 17% more ED visits than the provider definition and 2% fewer visits than the ResDAC definition. Differences in ED visitation counts between each definition occurred for several reasons including the inclusion of critical care or observation services in the ED, discrepancies between facility and provider billing regulations, and operational decisions of each definition. Current operational definitions of ED visitation using administrative claims produce different estimates of ED visitation based on the underlying assumptions applied to billing data and data set availability. Future analyses using administrative claims data should seek to validate specific definitions and inform the development of a consistent, consensus ED visitation definitions to standardize research reporting and the interpretation of policy interventions. © 2016 by the Society for Academic Emergency Medicine.

  16. VA Outpatient Visits by Administrative Parent, FY2010-2014

    Data.gov (United States)

    Department of Veterans Affairs — Outpatient visits by Administrative Parent. A visit is counted as a visit to one or more clinics or units within 1 calendar day at the site of care level. A patient...

  17. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different....... Compared to the predictions of an analyst observing untolled equilibrium and taking scheduling preferences as exogenous, we find that both the optimal capacity and the marginal external cost of congestion have changed. The benefits of tolling are greater, and the optimal time varying toll is different....

  18. Visit-to-visit blood pressure variability as a prognostic marker in patients with cardiovascular and cerebrovascular diseases--relationships and comparisons with vascular markers of atherosclerosis.

    Science.gov (United States)

    Lau, Kui Kai; Wong, Yuen Kwun; Chan, Yap Hang; Teo, Kay Cheong; Chan, Koon Ho; Wai Li, Leonard Sheung; Cheung, Raymond Tak Fai; Siu, Chung Wah; Ho, Shu Leong; Tse, Hung Fat

    2014-07-01

    Visit-to-visit blood pressure variability (BPV) is a simple surrogate marker for the development of atherosclerotic diseases, cardiovascular and all-cause mortality. Nevertheless, the relative prognostic value of BPV in comparison with other established vascular assessments remain uncertain. We prospectively followed-up 656 high-risk patients with diabetes or established cardiovascular or cerebrovascular diseases for the occurrence of major adverse cardiovascular events (MACEs). Baseline brachial endothelial function, carotid intima-media thickness (IMT) and plaque burden, ankle-brachial index and arterial stiffness were determined. Visit-to-visit BPV were recorded during a mean 18 ± 9 outpatient clinic visits. After a mean 81 ± 12 month's follow-up, 123 patients (19%) developed MACEs. Patients who developed a MACE had significantly higher systolic BPV, more severe endothelial function, arterial stiffness and systemic atherosclerotic burden compared to patients who did not develop a MACE (all Parea under receiver operating characteristic curve (AUC) 0.69 ± 0.03, PAUC 0.65 ± 0.03, P<0.01). After adjustment of confounding factors, a high BPV remained a significant independent predictor of MACE (hazards ratio 1.67, 95% confidence interval 1.14-2.43, P<0.01). Compared with established surrogate markers of atherosclerosis, visit-to-visit BPV provides similar prognostic information and may represent a new and simple marker for adverse outcomes in patients with vascular diseases. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  19. CERT TST December 2015 Visit Summary

    Energy Technology Data Exchange (ETDEWEB)

    Little, Robert Currier [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Bailey, Teresa S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gamblin, G. Todd [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Olinger, Chad Tracy [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Pautz, Shawn D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Williams, Alan B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-01-25

    The annual PSAAP II TST visit to Texas A&M’s CERT Center was held on December 1-3, 2015. The agenda for the visit is attached. Non-TAMU attendees were: TST Members – Teresa Bailey (LLNL), Todd Gamblin (LLNL), Bob Little (LANL) – Chair, Chad Olinger (LANL), Shawn Pautz (SNL), Alan Williams (SNL);Other Lab staff – Skip Kahler (LANL), Ana Kupresanin (LLNL), and Rob Lowrie (LANL); AST Members – Nelson Hoffman (LANL) and Bob Voigt (Leidos) The TST wishes to express our appreciation to all involved with CERT for the high-quality posters and presentations and for the attention to logistics that enabled a successful visit. We have broken our comments into four sections: (1) Kudos, (2) Recommendations, (3) Feedback on Priorities for April Review, and (4) Follow-Up Activities with Labs.

  20. This way for the new CERN visits!

    CERN Multimedia

    2008-01-01

    As the LHC start-up draws near, visits to the underground experiments by members of the public are no longer possible. Still, that doesn’t mean that there will be no more CERN visits. Far from it! Three new itineraries for visits to the above-ground facilities are already available to visitors. Follow the guide… CAST: How a magnet became a telescope. Hunting axions from the sun. Visitors to the CAST experiments will see, among other things, how a prototype dipole magnet built for the LHC has been turned into an unusual telescope that tracks the sun in search of the ‘axion’ particle postulated by theory. SM18: Super-cool magnets. This strategic building, where thousands of superconducting magnets for the LHC were assembled in their cryostats and tested, lets visitors into the secret world of magnet technology, radio frequency and cryogenics, ...

  1. Managing ecotourism visitation in protected areas

    Science.gov (United States)

    Marion, J.L.; Farrell, T.A.; Lindberg, Kreg; Wood, Megan Epler; Engeldrum, David

    1998-01-01

    Ecotourism management seeks to integrate and balance several potentially conflicting objectives: protection of natural and cultural resources, provision of recreation opportunities and generation of economic benefits. In the absence of effective planning and management, ecotourism can lead to significant negative impacts on vegetation, soil, water, wildlife, historic resources, cultures, and visitor experiences. This chapter reviews visitor-related natural resource and experience impacts associated with ecotourism within protected areas. The influence of factors that control the nature and extent of impacts are also reviewed, including type and amount of use, the variable resistance and resilience of environmental attributes such as vegetation and soil types, and the role of management in shaping visitation, resources and facilities to support visitation while minimizing associated impacts. Implications for managing the effects of protected area visitation are highlighted, including carrying capacity decision frameworks and selecting management strategies and tactics.

  2. Downlink scheduling using non-orthogonal uplink beams

    KAUST Repository

    Eltayeb, Mohammed E.

    2014-04-01

    Opportunistic schedulers rely on the feedback of the channel state information of users in order to perform user selection and downlink scheduling. This feedback increases with the number of users, and can lead to inefficient use of network resources and scheduling delays. We tackle the problem of feedback design, and propose a novel class of nonorthogonal codes to feed back channel state information. Users with favorable channel conditions simultaneously transmit their channel state information via non-orthogonal beams to the base station. The proposed formulation allows the base station to identify the strong users via a simple correlation process. After deriving the minimum required code length and closed-form expressions for the feedback load and downlink capacity, we show that i) the proposed algorithm reduces the feedback load while matching the achievable rate of full feedback algorithms operating over a noiseless feedback channel, and ii) the proposed codes are superior to the Gaussian codes.

  3. Downlink scheduling using non-orthogonal uplink beams

    KAUST Repository

    Eltayeb, Mohammed E.; Al-Naffouri, Tareq Y.; Bahrami, Hamid Reza Talesh

    2014-01-01

    Opportunistic schedulers rely on the feedback of the channel state information of users in order to perform user selection and downlink scheduling. This feedback increases with the number of users, and can lead to inefficient use of network resources and scheduling delays. We tackle the problem of feedback design, and propose a novel class of nonorthogonal codes to feed back channel state information. Users with favorable channel conditions simultaneously transmit their channel state information via non-orthogonal beams to the base station. The proposed formulation allows the base station to identify the strong users via a simple correlation process. After deriving the minimum required code length and closed-form expressions for the feedback load and downlink capacity, we show that i) the proposed algorithm reduces the feedback load while matching the achievable rate of full feedback algorithms operating over a noiseless feedback channel, and ii) the proposed codes are superior to the Gaussian codes.

  4. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  5. Information

    International Nuclear Information System (INIS)

    Boyard, Pierre.

    1981-01-01

    The fear for nuclear energy and more particularly for radioactive wastes is analyzed in the sociological context. Everybody agree on the information need, information is available but there is a problem for their diffusion. Reactions of the public are analyzed and journalists, scientists and teachers have a role to play [fr

  6. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  7. Hospital daily outpatient visits forecasting using a combinatorial model based on ARIMA and SES models.

    Science.gov (United States)

    Luo, Li; Luo, Le; Zhang, Xinli; He, Xiaoli

    2017-07-10

    Accurate forecasting of hospital outpatient visits is beneficial for the reasonable planning and allocation of healthcare resource to meet the medical demands. In terms of the multiple attributes of daily outpatient visits, such as randomness, cyclicity and trend, time series methods, ARIMA, can be a good choice for outpatient visits forecasting. On the other hand, the hospital outpatient visits are also affected by the doctors' scheduling and the effects are not pure random. Thinking about the impure specialty, this paper presents a new forecasting model that takes cyclicity and the day of the week effect into consideration. We formulate a seasonal ARIMA (SARIMA) model on a daily time series and then a single exponential smoothing (SES) model on the day of the week time series, and finally establish a combinatorial model by modifying them. The models are applied to 1 year of daily visits data of urban outpatients in two internal medicine departments of a large hospital in Chengdu, for forecasting the daily outpatient visits about 1 week ahead. The proposed model is applied to forecast the cross-sectional data for 7 consecutive days of daily outpatient visits over an 8-weeks period based on 43 weeks of observation data during 1 year. The results show that the two single traditional models and the combinatorial model are simplicity of implementation and low computational intensiveness, whilst being appropriate for short-term forecast horizons. Furthermore, the combinatorial model can capture the comprehensive features of the time series data better. Combinatorial model can achieve better prediction performance than the single model, with lower residuals variance and small mean of residual errors which needs to be optimized deeply on the next research step.

  8. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  9. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  10. How useful are preemptive schedules?

    NARCIS (Netherlands)

    Brucker, P.; Heitmann, S.; Hurink, J.L.

    2001-01-01

    Machine scheduling admits two options to process jobs. In a preemptive mode processing may be interrupted and resumed later even on a different machine. In a nonpreemptive mode interruptions are not allowed. Usually, the possibility to preempt jobs leads to better performance values. However, also

  11. Interaction in activity location scheduling

    NARCIS (Netherlands)

    Tabak, V.; Vries, de B.; Dijkstra, J.; Jessurun, A.J.

    2006-01-01

    In this paper we discuss the interaction in activity location scheduling which is the main subject of an ongoing research project called "User Simulation of Space Utilization". The aim of this research project is to develop an overall model for the simulation of human movement and utilization of

  12. Scheduling with target start times

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.; Klein Haneveld, W.K.; Vrieze, O.J.; Kallenberg, L.C.M.

    1997-01-01

    We address the single-machine problem of scheduling n independent jobs subject to target start times. Target start times are essentially release times that may be violated at a certain cost. The goal is to minimize an objective function that is composed of total completion time and maximum

  13. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  14. Flexible Schedules and Shift Work.

    Science.gov (United States)

    Beers, Thomas M.

    2000-01-01

    Flexible work hours have gained prominence, as more than 25 million workers (27.6% of all full-time workers) can now vary their schedules. However, there has been little change since the mid-1980s in the proportion who work a shift other than a regular daytime shift. (JOW)

  15. Scheduling periodic tasks with slack

    NARCIS (Netherlands)

    Korst, J.H.M.; Aarts, E.H.L.; Lenstra, J.K.

    1997-01-01

    We consider the problem of nonpreemptively scheduling periodic tasks on a minimum number of identical processors, assuming that some slack is allowed in the time between successive executions of a periodic task. We prove that the problem is NP-hard in the strong sense. Necessary and sufficient

  16. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    replace earlier versions of the F/A-18. Joint and International Nature At the time of JSF conception, there was a clear preference at the highest levels...ALPHABET SOUP ” (Aboulafia, 2015) OF STUDIES AND CONCEPTS • … MERGED INTO JAST • … WHICH EVOLVED TO JSF • WELL-KNOWN COST AND SCHEDULE

  17. Analyzing NPS Scheduling Using OSIRIS

    Science.gov (United States)

    1993-03-01

    School TEACHER SCHEDULE BLOCKS REPORT Date: 2/19/93 Period Name ID Term Days 1234 Adragna , Joe 170401 1 F xx Agrawal, Brij 120101 1 F xx Almquist...LOAD REPORT Date: 3/18/93 Total Max Consec Total Teacher ID Term Classes Classes Stud Adragna , Joe 170401 1 1 1 3 Agrawal, Brij 120101 1 2 2 98 Aiello

  18. Comparison of post-obturation pain experience following one-visit and two-visit root canal treatment on teeth with vital pulps: a randomized controlled trial.

    Science.gov (United States)

    Wang, C; Xu, P; Ren, L; Dong, G; Ye, L

    2010-08-01

    To compare the incidence and intensity of post-obturation pain after one- or two-visit root canal treatment (RCT) on anterior teeth with vital pulps and a single root and canal in a randomized controlled trial. One hundred patients requiring RCT on permanent anterior teeth with vital pulps preoperatively were included. The patients were assigned randomly into two groups of 50 patients each. After local anaesthesia, isolation, access and pulp extirpation, the canals of all teeth were prepared using engine-driven rotary ProTaper nickel-titanium instruments in a crown-down technique and irrigated with 2.5% NaOCl. The teeth in group 1 (n = 50) were filled with AH Plus sealer and gutta-percha using a lateral compaction technique at the first visit, whilst those in group 2 (n = 50) were medicated with a calcium hydroxide paste, a sterile dry cotton pellet and Caviton and scheduled for a second visit 7 days later. A modified verbal descriptor scale was used to measure preoperative pain and post-obturation pain at 6, 24, 48 h and 1 week after operation. Chi-square tests and independent-sample T-tests were used to compare the incidence and intensity of post-obturation pain of two groups at each interval. Eleven patients were excluded from the study as they failed to follow the scheduled revisit or their selected teeth had more than one root canal. Data were obtained from the remaining 89 patients. Forty-three patients were undergoing one-visit treatment (group 1) and 46 undergoing two-visit treatment (group 2). Most patients in both groups reported no pain or only slight pain within each post-obturation interval, only one in group 1 and one in group 2 had flare-ups and slight swelling. There was no statistically significant difference in the incidence and intensity of post-obturation pain experienced by two groups. The incidence and intensity of post-obturation pain experience following one- or two-visit RCT on teeth with vital pulps and a single canal were not

  19. On Multiple Users Scheduling Using Superposition Coding over Rayleigh Fading Channels

    KAUST Repository

    Zafar, Ammar

    2013-02-20

    In this letter, numerical results are provided to analyze the gains of multiple users scheduling via superposition coding with successive interference cancellation in comparison with the conventional single user scheduling in Rayleigh blockfading broadcast channels. The information-theoretic optimal power, rate and decoding order allocation for the superposition coding scheme are considered and the corresponding histogram for the optimal number of scheduled users is evaluated. Results show that at optimality there is a high probability that only two or three users are scheduled per channel transmission block. Numerical results for the gains of multiple users scheduling in terms of the long term throughput under hard and proportional fairness as well as for fixed merit weights for the users are also provided. These results show that the performance gain of multiple users scheduling over single user scheduling increases when the total number of users in the network increases, and it can exceed 10% for high number of users

  20. Sharing data for production scheduling using the ISA-95 standard

    Directory of Open Access Journals (Sweden)

    Iiro eHarjunkoski

    2014-10-01

    Full Text Available In the development and deployment of production scheduling solutions one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment and other resources are necessary for producing a realistic short-term production plan. Currently, a widely-accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data-exchange for scheduling solutions.

  1. A Market-Based Approach to Multi-factory Scheduling

    Science.gov (United States)

    Vytelingum, Perukrishnen; Rogers, Alex; MacBeth, Douglas K.; Dutta, Partha; Stranjak, Armin; Jennings, Nicholas R.

    In this paper, we report on the design of a novel market-based approach for decentralised scheduling across multiple factories. Specifically, because of the limitations of scheduling in a centralised manner - which requires a center to have complete and perfect information for optimality and the truthful revelation of potentially commercially private preferences to that center - we advocate an informationally decentralised approach that is both agile and dynamic. In particular, this work adopts a market-based approach for decentralised scheduling by considering the different stakeholders representing different factories as self-interested, profit-motivated economic agents that trade resources for the scheduling of jobs. The overall schedule of these jobs is then an emergent behaviour of the strategic interaction of these trading agents bidding for resources in a market based on limited information and their own preferences. Using a simple (zero-intelligence) bidding strategy, we empirically demonstrate that our market-based approach achieves a lower bound efficiency of 84%. This represents a trade-off between a reasonable level of efficiency (compared to a centralised approach) and the desirable benefits of a decentralised solution.

  2. Sharing Data for Production Scheduling Using the ISA-95 Standard

    Energy Technology Data Exchange (ETDEWEB)

    Harjunkoski, Iiro, E-mail: iiro.harjunkoski@de.abb.com; Bauer, Reinhard [ABB Corporate Research, Industrial Software and Applications, Ladenburg (Germany)

    2014-10-21

    In the development and deployment of production scheduling solutions, one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment, and other resources are necessary for producing a realistic short-term production plan. Currently, a widely accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data exchange for scheduling solutions.

  3. Sharing Data for Production Scheduling Using the ISA-95 Standard

    International Nuclear Information System (INIS)

    Harjunkoski, Iiro; Bauer, Reinhard

    2014-01-01

    In the development and deployment of production scheduling solutions, one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment, and other resources are necessary for producing a realistic short-term production plan. Currently, a widely accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data exchange for scheduling solutions.

  4. Imperial College London mascot visits CERN

    CERN Multimedia

    Hills, Stephanie

    2014-01-01

    Boanerges (‘Son of Thunder’) is one of the mascots of Imperial College and is looked after by volunteer students of the City and Guilds College Motor Club. Team Bo visited CERN as part of a wider tour of France and Switzerland.

  5. President of the Slovak Republic visits CERN

    CERN Multimedia

    Caroline Duc

    2012-01-01

    On 11 September 2012, the President of the Slovak Republic, Ivan Gašparovič, visited CERN accompanied by the First Lady and a delegation of 67, including the Deputy Prime Minister, the Minister of Foreign Affairs, the Minister of Economy and the Ambassadors of the Slovak Republic to Switzerland, France and the Office of the United Nations. The visit by representatives of the Slovak Republic follows the Slovak Republic’s hosting of the CERN Accelerator School in the region of Bratislava. After being welcomed to CERN in the morning by CERN Director-General Rolf Heuer, the members of the Slovak government were given the opportunity to get a glimpse of the LHC and to visit the ALICE experiment at Point 2. The President and other members of the Slovak delegation then met representatives of Slovak universities and industries at an exhibition of their work in the hall of Building 500. The President then briefly spoke to Slovak journalists and signed the VIP visitors book. The visit last...

  6. Leisure time and museums - motives of visits

    Directory of Open Access Journals (Sweden)

    Medić Sandra

    2015-01-01

    Full Text Available Leisure time, as the time used to engage in a variety of activities, should provide a sense of satisfaction and relaxation. In order to satisfy the needs of the visitors and their desire to experience something new and authentic in tourist destination, it is very important to know what their choices are with regard to leisure activities. The aim of this paper is to determine how museum public usually spends its leisure time, which factors influence the motivation to visit museums, and to try to find a correlation between the two. The paper is based on the results of the study conducted between the end of May and the end of August, 2014 in the museums in Vojvodina Province (northern part of the Republic of Serbia. The main findings of this paper indicate that spending leisure time is primarily related to socialization and education, and that museums are visited mostly due to their educational role. The findings also indicate that there are differences between the choice of leisure activity and motivation for visiting museums and sociodemographic characteristics of the respondents. Significant correlation has been found between the choice of leisure activity and motivation for visiting museums.

  7. Japanese Visit CERN's Jardin d'Enfants

    CERN Multimedia

    2000-01-01

    On 1 November twenty four Japanese teachers from the Association of Private Kindergartens in Osaka visited CERN’s Jardin d’Enfants to exchange experience and learn more about the Swiss educational system. The delegation was lead by Mrs. Nobuko Shirae, President of the Association, and Mr. Takeshi Kakimoto from the Japan Travel Bureau.

  8. Unsupervised visit detection in smart homes

    NARCIS (Netherlands)

    Nait Aicha, A.; Englebienne, G.; Kröse, B.

    Assistive technologies for elderly often use ambient sensor systems to infer activities of daily living (ADL). In general such systems assume that only a single person (the resident) is present in the home. However, in real world environments, it is common to have visits and it is crucial to know

  9. Unsupervised visit detection in smart homes

    NARCIS (Netherlands)

    Nait Aicha, Ahmed; Englebienne, Gwenn; Kröse, B.J.A.

    2017-01-01

    Assistive technologies for elderly often use ambient sensor systems to infer activities of daily living (ADL). In general such systems assume that only a single person (the resident) is present in the home. However, in real world environments, it is common to have visits and it is crucial to know

  10. How Home Visits Transformed My Teaching

    Science.gov (United States)

    El Yaafouri-Kreuzer, Louise

    2017-01-01

    Recalling her year as the "English-speaking unicorn" in a class of refugee and immigrant students representing a myriad of languages, the author tells how visiting students at their homes was the strategy that most helped her help students. From discovering that a betel-nut habit was causing one student's hyperactivity to seeing another…

  11. Declining national park visitation: An economic analysis

    Science.gov (United States)

    Thomas H. Stevens; Thomas A. More; Marla. Markowski-Lindsay

    2014-01-01

    Visitation to the major nature-based national parks has been declining. This paper specifies an econometric model that estimates the relative impact of consumer incomes, travel costs, entry fees and other factors on per capita attendance from 1993 to 2010. Results suggest that entrance fees have had a statistically significant but small impact on per capita attendance...

  12. 28 CFR 540.47 - Media visits.

    Science.gov (United States)

    2010-07-01

    ... Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT CONTACT WITH... who wishes to visit outside his or her official duties, however, must qualify as a regular visitor or, if applicable, a special visitor. [68 FR 10658, Mar. 6, 2003] ...

  13. Digital screen visits in home care services

    DEFF Research Database (Denmark)

    Zarakit, Mohamad; Nors Hansen, Louise; Evron, Lotte Orr

    2017-01-01

    with participant observation of three selected screen visits with older patients with a minority ethnic background. Analysis: thematic analysis based on a hermeneutic approach. Primarily results indicate that older patients with a minority ethnic background are screened out during the recruitment phase for digital...

  14. Comparison of Strategies for Signaling of Scheduling Assignments in Wireless OFDMA

    OpenAIRE

    Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niclas; Frenger, Pål; Gunnarsson, Fredrik

    2010-01-01

    This paper considers transmission of scheduling information in  OFDMA-based cellular communication systems such as 3GPP long-term  evolution (LTE). These systems provide efficient usage of radio  resources by allowing users to be scheduled dynamically in both  frequency and time. This requires considerable amounts of scheduling  information to be sent to the users.  The paper compares two basic transmission strategies: transmitting a  separate scheduling message to each user versus broadcasti...

  15. Using a vision cognitive algorithm to schedule virtual machines

    Directory of Open Access Journals (Sweden)

    Zhao Jiaqi

    2014-09-01

    Full Text Available Scheduling virtual machines is a major research topic for cloud computing, because it directly influences the performance, the operation cost and the quality of services. A large cloud center is normally equipped with several hundred thousand physical machines. The mission of the scheduler is to select the best one to host a virtual machine. This is an NPhard global optimization problem with grand challenges for researchers. This work studies the Virtual Machine (VM scheduling problem on the cloud. Our primary concern with VM scheduling is the energy consumption, because the largest part of a cloud center operation cost goes to the kilowatts used. We designed a scheduling algorithm that allocates an incoming virtual machine instance on the host machine, which results in the lowest energy consumption of the entire system. More specifically, we developed a new algorithm, called vision cognition, to solve the global optimization problem. This algorithm is inspired by the observation of how human eyes see directly the smallest/largest item without comparing them pairwisely. We theoretically proved that the algorithm works correctly and converges fast. Practically, we validated the novel algorithm, together with the scheduling concept, using a simulation approach. The adopted cloud simulator models different cloud infrastructures with various properties and detailed runtime information that can usually not be acquired from real clouds. The experimental results demonstrate the benefit of our approach in terms of reducing the cloud center energy consumption

  16. 15 CFR 745.1 - Advance notification and annual report of all exports of Schedule 1 chemicals to other States...

    Science.gov (United States)

    2010-01-01

    ... § 745.1 Advance notification and annual report of all exports of Schedule 1 chemicals to other States... Prohibition of Chemical Weapons (OPCW) not less than 30 days in advance of every export of a Schedule 1...: “Advance Notification of Schedule 1 Chemical Export”. (3) Upon receipt of the notification, BIS will inform...

  17. 75 FR 75448 - Revised Proposal for Revisions to the Schedules of Civil Penalties for a Violation of a Federal...

    Science.gov (United States)

    2010-12-03

    ... the Schedules of Civil Penalties for a Violation of a Federal Railroad Safety Law or Federal Railroad... September 21, 2010. The proposal, if adopted, would amend, line by line, FRA's schedules of civil penalties... . SUPPLEMENTARY INFORMATION: FRA's proposal to amend, line by line, FRA's schedules of civil penalties as well as...

  18. Monitoring Quality Across Home Visiting Models: A Field Test of Michigan's Home Visiting Quality Assurance System.

    Science.gov (United States)

    Heany, Julia; Torres, Jennifer; Zagar, Cynthia; Kostelec, Tiffany

    2018-06-05

    Introduction In order to achieve the positive outcomes with parents and children demonstrated by many home visiting models, home visiting services must be well implemented. The Michigan Home Visiting Initiative developed a tool and procedure for monitoring implementation quality across models referred to as Michigan's Home Visiting Quality Assurance System (MHVQAS). This study field tested the MHVQAS. This article focuses on one of the study's evaluation questions: Can the MHVQAS be applied across models? Methods Eight local implementing agencies (LIAs) from four home visiting models (Healthy Families America, Early Head Start-Home Based, Parents as Teachers, Maternal Infant Health Program) and five reviewers participated in the study by completing site visits, tracking their time and costs, and completing surveys about the process. LIAs also submitted their most recent review by their model developer. The researchers conducted participant observation of the review process. Results Ratings on the MHVQAS were not significantly different between models. There were some differences in interrater reliability and perceived reliability between models. There were no significant differences between models in perceived validity, satisfaction with the review process, or cost to participate. Observational data suggested that cross-model applicability could be improved by assisting sites in relating the requirements of the tool to the specifics of their model. Discussion The MHVQAS shows promise as a tool and process to monitor implementation quality of home visiting services across models. The results of the study will be used to make improvements before the MHVQAS is used in practice.

  19. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  20. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  1. MOV reliability evaluation and periodic verification scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Bunte, B.D.

    1996-12-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs.

  2. MOV reliability evaluation and periodic verification scheduling

    International Nuclear Information System (INIS)

    Bunte, B.D.

    1996-01-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs

  3. Family presence and participation during medical visits of heart failure patients: An analysis of survey and audiotaped communication data.

    Science.gov (United States)

    Cené, Crystal W; Haymore, Beth; Laux, Jeffrey P; Lin, Feng-Chang; Carthron, Dana; Roter, Debra; Cooper, Lisa A; Chang, Patricia P; Jensen, Brian C; Miller, Paula F; Corbie-Smith, Giselle

    2017-02-01

    To describe the frequency, roles, and utility of family companion involvement in the care of patients with Heart Failure (HF) care and to examine the association between audiotaped patient, companion, and provider communication behaviors. We collected survey data and audiotaped a single medical visit for 93 HF patients (36 brought a companion into the examination room) and their cardiology provider. Communication data was analyzed using the Roter Interaction Analysis System. There were 32% more positive rapport-building statements (p<0.01) and almost three times as many social rapport-building statements (p<0.01) from patients and companions in accompanied visits versus unaccompanied patient visits. There were less psychosocial information giving statements in accompanied visits compared to unaccompanied patient visits (p<0.01.) Providers made 25% more biomedical information giving statements (p=0.04) and almost three times more social rapport-building statements (p<0.01) in accompanied visits. Providers asked fewer biomedical and psychosocial questions in accompanied versus unaccompanied visits. Providers made 16% fewer partnership-building statements in accompanied versus unaccompanied visits (p=0.01). Our findings are mixed regarding the benefits of accompaniment for facilitating patient-provider communication based on survey and audiotaped data. Strategies to enhance engagement during visits, such as pre-visit question prompt lists, may be beneficial. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  4. Informe

    Directory of Open Access Journals (Sweden)

    Egon Lichetenberger

    1950-10-01

    Full Text Available Informe del doctor Egon Lichetenberger ante el Consejo Directivo de la Facultad, sobre el  curso de especialización en Anatomía Patológica patrocinado por la Kellogg Foundation (Departamento de Patología

  5. Discordance between 'actual' and 'scheduled' check-in times at a heart failure clinic.

    Directory of Open Access Journals (Sweden)

    Eiran Z Gorodeski

    Full Text Available A 2015 Institute Of Medicine statement "Transforming Health Care Scheduling and Access: Getting to Now", has increased concerns regarding patient wait times. Although waiting times have been widely studied, little attention has been paid to the role of patient arrival times as a component of this phenomenon. To this end, we investigated patterns of patient arrival at scheduled ambulatory heart failure (HF clinic appointments and studied its predictors. We hypothesized that patients are more likely to arrive later than scheduled, with progressively later arrivals later in the day.Using a business intelligence database we identified 6,194 unique patients that visited the Cleveland Clinic Main Campus HF clinic between January, 2015 and January, 2017. This clinic served both as a tertiary referral center and a community HF clinic. Transplant and left ventricular assist device (LVAD visits were excluded. Punctuality was defined as the difference between 'actual' and 'scheduled' check-in times, whereby negative values (i.e., early punctuality were patients who checked-in early. Contrary to our hypothesis, we found that patients checked-in late only a minority of the time (38% of visits. Additionally, examining punctuality by appointment hour slot we found that patients scheduled after 8AM had progressively earlier check-in times as the day progressed (P < .001 for trend. In both a Random Forest-Regression framework and linear regression models the most important risk-adjusted predictors of early punctuality were: later in the day appointment hour slot, patient having previously been to the hospital, age in the early 70s, and white race.Patients attending a mixed population ambulatory HF clinic check-in earlier than scheduled times, with progressive discrepant intervals throughout the day. This finding may have significant implications for provider utilization and resource planning in order to maximize clinic efficiency. The impact of elective early

  6. Discordance between 'actual' and 'scheduled' check-in times at a heart failure clinic.

    Science.gov (United States)

    Gorodeski, Eiran Z; Joyce, Emer; Gandesbery, Benjamin T; Blackstone, Eugene H; Taylor, David O; Tang, W H Wilson; Starling, Randall C; Hachamovitch, Rory

    2017-01-01

    A 2015 Institute Of Medicine statement "Transforming Health Care Scheduling and Access: Getting to Now", has increased concerns regarding patient wait times. Although waiting times have been widely studied, little attention has been paid to the role of patient arrival times as a component of this phenomenon. To this end, we investigated patterns of patient arrival at scheduled ambulatory heart failure (HF) clinic appointments and studied its predictors. We hypothesized that patients are more likely to arrive later than scheduled, with progressively later arrivals later in the day. Using a business intelligence database we identified 6,194 unique patients that visited the Cleveland Clinic Main Campus HF clinic between January, 2015 and January, 2017. This clinic served both as a tertiary referral center and a community HF clinic. Transplant and left ventricular assist device (LVAD) visits were excluded. Punctuality was defined as the difference between 'actual' and 'scheduled' check-in times, whereby negative values (i.e., early punctuality) were patients who checked-in early. Contrary to our hypothesis, we found that patients checked-in late only a minority of the time (38% of visits). Additionally, examining punctuality by appointment hour slot we found that patients scheduled after 8AM had progressively earlier check-in times as the day progressed (P < .001 for trend). In both a Random Forest-Regression framework and linear regression models the most important risk-adjusted predictors of early punctuality were: later in the day appointment hour slot, patient having previously been to the hospital, age in the early 70s, and white race. Patients attending a mixed population ambulatory HF clinic check-in earlier than scheduled times, with progressive discrepant intervals throughout the day. This finding may have significant implications for provider utilization and resource planning in order to maximize clinic efficiency. The impact of elective early arrival on

  7. Max Weber Visits America: A Review of the Video

    Directory of Open Access Journals (Sweden)

    Michael Wise

    2006-11-01

    Full Text Available The North Carolina Sociological Society is proud to announce the long-awaited video of Max Weber's trip to North Carolina as retold by two of his cousins. Max Weber made a trip to visit relatives in Mount Airy, North Carolina, in 1904. This 2004 narrative by Larry Keeter and Stephen Hall is the story of locating and interviewing two living eyewitnesses (1976 to Max Weber's trip. The video includes information about Weber's contributions to modern sociology. Dowloadable files are provided using the .mp4 format. The video should appeal to students and professors interested in Max Weber. It can be included in courses ranging from introductory sociology to theory.

  8. Mathieu Briancourt, Visite au phalanstère, 1848

    OpenAIRE

    2017-01-01

    Introduction par Florent Perrier Malgré plusieurs rééditions de sa Visite au Phalanstère, malgré sa traduction en allemand puis en anglais, avant 1850, rares sont les informations disponibles sur Mathieu Briancourt (1793-1882), ouvrier teinturier, sinon qu’il fut un inlassable propagateur du fouriérisme jusqu’aux années 1870, ne reniant jamais ses engagements premiers auxquels il consacra plusieurs ouvrages fameux, dont L’Organisation du travail et l’Association. Reprenant un mode de descript...

  9. Members of House Committee on Science and Astronautics Visited MSFC

    Science.gov (United States)

    1962-01-01

    The members of the House Committee on Science and Astronautics visited the Marshall Space Flight Center (MSFC) on March 9, 1962 to gather first-hand information of the nation's space exploration program. The congressional group was composed of members of the Subcommittee on Marned Space Flight. Headed by Representative Olin E. Teague of Texas, other members were James G. Fulton, Pennsylvania; Ken Heckler, West Virginia; R. Walter Riehlman, New York; Richard L. Roudebush,, Indiana; John W. Davis, Georgia; James C. Corman, California; Joseph Waggoner, Louisiana; J. Edgar Chenoweth, Colorado; and William G. Bray, Indiana.

  10. The Impact of Hospital Visiting Hour Policies on Pediatric and Adult Patients and their Visitors.

    Science.gov (United States)

    Smith, Lisa; Medves, Jennifer; Harrison, Margaret B; Tranmer, Joan; Waytuck, Brett

    Policies concerning restricted or open visiting hours are being challenged in health care institutions internationally, with no apparent consensus on the appropriateness of the visiting hour policies for pediatric and adult patients. The rules that govern practice are often based on the institutional precedent and assumptions of staff, and may have little or no evidence to support them. Policy and practice related to visiting hours is of pressing concern in Canada, and in Ontario specifically, following the reaction to the Severe Acute Respiratory Syndrome (SARS) outbreak in 2003 and subsequent changes in visiting policies in most health care settings. A systematic investigation of the impact of hospital visiting hours on visitors (including patients, families, and significant others) would inform decision-makers who are responsible for hospital policies about the best available evidence. The objective of this review was to appraise and synthesize the best available evidence on the impact of hospital visiting hours on patients and their visitors. Types of participants This review considered studies that included both pediatric and adult hospital patients and their visitors. Participants were either patients, visitors, or health care providers in the following hospital settings: medical/surgical units, critical care (ICU, CCU, NICU), pediatrics, maternity, or general hospital wards.Articles were excluded if participants came from the following settings: post-operative and post-anaesthesia care units (PACU), dementia wards, long-term care settings or retirement homes, or delivery rooms. PACUs were excluded because there are aspects of the presence of visitors to these units that are very specific, and differ from the general visits to patients who are not in the immediate post-operative stage. Dementia wards, long-term care settings and retirement homes were excluded because these were considered to be their "home", so visiting would be quite different from that on

  11. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker cons...... consumption and the impact on the remaining network and the customer service level. The model is applied to 4 real cases from Maersk Line. Solutions are comparable or superior to those chosen by operations managers. Cost savings of up to 58% may be achieved.......Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  12. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  13. Supporting Family Engagement in Home Visiting with the Family Map Inventories

    OpenAIRE

    Kyzer, Angela; Whiteside-Mansell, Leanne; McKelvey, Lorraine; Swindle, Taren

    2016-01-01

    The purpose of this study was to examine the feasibility and usefulness of a universal screening tool, the Family Map Inventory (F MI), to assess family strengths and needs in a home visiting program. The FMI has been used successfully by center-based early childcare programs to tailor services to family need and build on existing strengths. Home visiting coordinators (N = 39) indicated the FMI would provide useful information, and they had the capacity to implement. In total, 70 families who...

  14. Application of frequent itemsets mining to analyze patterns of one-stop visits in Taiwan.

    Directory of Open Access Journals (Sweden)

    Chun-Yi Tu

    Full Text Available BACKGROUND: The free choice of health care facilities without limitations on frequency of visits within the National Health Insurance in Taiwan gives rise to not only a high number of annual ambulatory visits per capita but also a unique "one-stop shopping"phenomenon, which refers to a patient' visits to several specialties of the same healthcare facility in one day. The visits to multiple physicians would increase the potential risk of polypharmacy. The aim of this study was to analyze the frequency and patterns of one-stop visits in Taiwan. METHODOLOGY/PRINCIPAL FINDINGS: The claims datasets of 1 million nationally representative people within Taiwan's National Health Insurance in 2005 were used to calculate the number of patients with one-stop visits. The frequent itemsets mining was applied to compute the combination patterns of specialties in the one-stop visits. Among the total 13,682,469 ambulatory care visits in 2005, one-stop visits occurred 144,132 times and involved 296,822 visits (2.2% of all visits by 66,294 (6.6% persons. People tended to have this behavior with age and the percentage reached 27.5% (5,662 in 20,579 in the age group ≥80 years. In general, women were more likely to have one-stop visits than men (7.2% vs. 6.0%. Internal medicine plus ophthalmology was the most frequent combination with a visited frequency of 3,552 times (2.5%, followed by cardiology plus neurology with 3,183 times (2.2%. The most frequent three-specialty combination, cardiology plus neurology and gastroenterology, occurred only 111 times. CONCLUSIONS/SIGNIFICANCE: Without the novel computational technique, it would be hardly possible to analyze the extremely diverse combination patterns of specialties in one-stop visits. The results of the study could provide useful information either for the hospital manager to set up integrated services or for the policymaker to rebuild the health care system.

  15. Preemptive scheduling in overloaded systems

    Czech Academy of Sciences Publication Activity Database

    Chrobak, M.; Epstein, L.; Noga, J.; Sgall, Jiří; van Stee, R.; Tichý, Tomáš; Vakhania, N.

    2003-01-01

    Roč. 67, č. 1 (2003), s. 183-197 ISSN 0022-0000 R&D Projects: GA ČR GA201/01/1195; GA MŠk ME 476; GA AV ČR IAA1019901; GA MŠk LN00A056 Institutional research plan: CEZ:AV0Z1019905; CEZ:AV0Z1019905 Keywords : scheduling * online algorithms * benefit Subject RIV: BA - General Mathematics Impact factor: 0.795, year: 2003

  16. WCET Analysis for Preemptive Scheduling

    OpenAIRE

    Altmeyer, Sebastian; Gebhard, Gernot

    2008-01-01

    Hard real-time systems induce strict constraints on the timing of the task set. Validation of these timing constraints is thus a major challenge during the design of such a system. Whereas the derivation of timing guarantees must already be considered complex if tasks are running to completion, it gets even more complex if tasks are scheduled preemptively -- especially due to caches, deployed to improve the average performance. In this paper we propose a new method to compu...

  17. Scheduling Maintenance Jobs in Networks

    OpenAIRE

    Abed, Fidaa; Chen, Lin; Disser, Yann; Groß, Martin; Megow, Nicole; Meißner, Julie; Richter, Alexander T.; Rischke, Roman

    2017-01-01

    We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time; for the special case of path networks, this is related to the problem of minimizing the busy time of machines. We show that the problem can be solved in polynomial time in arbitrary networks if preemption is allowed. If preemption is restricted to integral t...

  18. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  19. Broadcast scheduling for mobile advertising

    OpenAIRE

    De Reyck, B.; Degraeve, Z.

    2003-01-01

    We describe a broadcast scheduling system developed for a precision marketing firm specialized in location-sensitive permission-based mobile advertising using SMS (Short Message Service) text messaging. Text messages containing advertisements were sent to registered customers when they were shopping in one of two shopping centers in the vicinity of London. The ads typically contained a limited-time promotional offer. The company's problem was deciding which ads to send out to which customers ...

  20. Schedule of the nuclear program

    International Nuclear Information System (INIS)

    Heigl, F.

    1977-01-01

    The lecure tries to explain the main phases which must be passed to establish nuclear power plants, the feasibility phase, preconstruction and construction phase. Each phase consists of a lot of activities which are commented. Further the lecture tries to give some ideas of durances and dependence between the phases or activities to get a complete time schedule of the realization of a nuclear power project. (HP) [de

  1. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  2. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  3. Reducing Downlink Signaling Traffic in Wireless Systems Using Mobile-Assisted Scheduling

    OpenAIRE

    Moosavi, Reza; Larsson, Erik G.

    2010-01-01

    We present an idea to reduce the part of the downlink signaling traffic in wireless multiple access systems that contains scheduling information. The theoretical basis of the scheme is that the scheduling decisions made by the base station are correlated with the CSI reports from the mobiles. This correlation can be exploited by the source coding scheme that is used to compress the scheduling maps before they are sent to the mobiles. In the proposed scheme, this idea is implemented by letting...

  4. A branch-and-price algorithm for the long-term home care scheduling problem

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    2012-01-01

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans such that a high quality of service is maintained, the work hours of the employees are respected, and the overall cost is kept as low as possible. We...... propose a branchand-price algorithm for the long-term home care scheduling problem. The pricing problem generates a one-day plan for an employee, and the master problem merges the plans with respect to regularity constraints. The method is capable of generating plans with up to 44 visits during one week....

  5. Prime-Minister of Malta visits CERN

    CERN Multimedia

    2008-01-01

    The Prime-Minister of Malta, Dr Lawrence Gonzi, visited CERN and met Director-General, Robert Aymar, on 10 January. The Prime-Minister of Malta, Dr Lawrence Gonzi, and CERN Director-General, Robert Aymar, signed a cooperation agreement. Dr Gonzi was given guided tours of the CMS experiment at Point 5 in Cessy and of the LHC magnet test facility, in which his country was involved. One of the high points of the day was the signing of a cooperation agreement between CERN and the Government of the Republic of Malta, aimed at the development of scientific and technical collaboration. "I’m really enthusiastic about this agreement, which constitutes a first step towards real collaboration between the Maltese government and CERN," said Nicholas Sammut, a Maltese engineer at CERN who was present throughout the visit (on the right). See also the video.

  6. Simple visit behavior unifies complex Zika outbreaks

    Directory of Open Access Journals (Sweden)

    P.D. Manrique

    2017-12-01

    Full Text Available New outbreaks of Zika in the U.S. are imminent. Human nature dictates that many individuals will continue to revisit affected ‘Ground Zero’ patches, whether out of choice, work or family reasons − yet this feature is missing from traditional epidemiological analyses. Here we show that this missing visit-revisit mechanism is by itself capable of explaining quantitatively the 2016 human Zika outbreaks in all three Ground Zero patches. Our findings reveal counterintuitive ways in which this human flow can be managed to tailor any future outbreak’s duration, severity and time-to-peak. Effective public health planning can leverage these results to impact the evolution of future outbreaks via soft control of the overall human flow, as well as to suggest best-practice visitation behavior for local residents.

  7. Members of the Forum Engelberg visit CERN

    CERN Multimedia

    Patrive Loïez

    2002-01-01

    The Forum Engelberg is an annual interdisciplinary conference held in Engelberg, Switzerland intended to act as an international platform for debate and exchange of views on key issues affecting scientific research, technology, economics and philosophy. Its President is Hubert Curien - former French Minister of Research and Space Research, and President of the CERN Council from 1994 to 1996. Photo 01: CERN Director-General Prof. Luciano Maiani (left) speaks to Forum members and public figures from the Geneva area during the visit. In the background is Jean-Claude Landry from the Department of the Interior, Agriculture and Environment, State of Geneva. Photo 02: CERN Director-General Prof. Luciano Maiani (left) speaks to Forum members and public figures from the Geneva area during the visit. In the background is Bernard Ecoffey, Founder of the Forum Engelberg.

  8. Prime Minister of Pakistan visits CERN

    CERN Multimedia

    Anaïs Schaeffer

    2016-01-01

    On Saturday, 23 January 2016, CERN welcomed Mr Muhammad Nawaz Sharif, Prime Minister of Pakistan.   From left to right: Minister of Finance Mr Mohammad Ishaq Dar, Prime Minister of the Islamic Republic of Pakistan, Muhammad Nawaz Sharif, CERN Director-General Fabiola Gianotti and CMS national contact physicist Hafeez Hoorani. Mr Muhammad Nawaz Sharif arrived at Point 5 in Cessy, where he was welcomed onto French soil by the sous-préfet of Cessy, Stéphane Donnot, and, representing CERN, Director-General Fabiola Gianotti, Directors Eckhard Elsen and Charlotte Warakaulle, and Rüdiger Voss, the adviser for relations with Pakistan. It was the first visit by a head of government of Pakistan since the country became CERN's latest Associate Member State in July 2015. The Prime Minister then had the opportunity to visit the CMS underground experimental area accompanied by the CMS Spokesperson, Tiziano Camporesi, and the CMS collaboration’...

  9. ITER delegation visits the Republic of Korea

    International Nuclear Information System (INIS)

    Aymar, R.

    2003-01-01

    Following the expression of interest of the Republic of Korea in joining the ITER Negotiations, a technical delegation from the ITER International Team and the Participant Teams visited the country on 14-16 April 2003. The goal was to assess, through visits to laboratories and some relevant industries, the capability of the Republic of Korea to contribute 'in kind' to ITER construction. There is presently in the Republic of Korea a strong interest at Government and industry levels in supporting fusion research within the framework of the long term development of alternative energy supplies. The large investment in the Korean Superconducting Tokamak (KSTAR), a very ambitious project from a previously very limited programme, is a concrete demonstration of this interest and the expression of interest to participate in ITER follows the same line

  10. Google Science Fair winner visits CERN

    CERN Document Server

    Katarina Anthony

    2012-01-01

    Google Science Fair Grand Prize winner Brittany Michelle Wenger today wrapped up a day-and-a-half's visit of the CERN site. Her winning project uses an artificial neural network to diagnose breast cancer – a non-invasive technique with significant potential for use in hospitals.   Brittany Michelle Wenger at CERN's SM18 Hall. Besides winning a $50,000 scholarship from Google and work experience opportunities with some of the contest hosts, Brittany was offered a personal tour of CERN. “This visit has just been incredible,” she says. “I got to speak with [CERN's Director for Accelerators and Technology] Steve Myers about some of the medical applications and technologies coming out of the LHC experiments and how they can be used to treat cancer. We talked about proton therapy and hadron therapy, which could really change the way patients are treated, improving success rates and making treatment not such an excruciating process. That ...

  11. A first-of-its-kind visit for 12 Algerian professors and students

    CERN Multimedia

    Kate Shaw

    2014-01-01

    The Cirta-Science competition is open to 51 high schools in the Constantine region of Algeria. This year the prize for the winners was a historic visit to see the place where the Higgs boson was discovered and meet scientists working at CERN, some of whom are from Algeria.   The group was composed of two physics professors from Constantine University and ten students from the Algerian Sirius Astronomy Association, including three laureates of the Cirta-Science scientific competition. Abdelhak Djouadi, a theoretical physicist at CERN from Algeria, was invited to announce the winners of this prestigious competition. The group of visitors had a very tight schedule, including a number of meetings with CERN scientists and visits to the SC, ATLAS and CMS. Since 2008 Algeria has had an international cooperation agreement with CERN, and in May 2014 a Protocol was signed which will involve the ATLAS and ISOLDE experiments.

  12. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  13. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  14. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  15. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  16. CMS Virtual Visit - Researchers Night in Portugal

    CERN Multimedia

    Abreu, Pedro

    2016-01-01

    Researchers Night at Planetarium Calouste Gulbenkian - Ciência Viva Centre in Lisbon. Organised by researchers from LIP (Laboratório de Instrumentação e Física Experimental de Partículas) and including CMS Virtual Visit during which André David Tinoco Mendes and José Rasteiro da Silva, based at Cessy, France, "virtually" discussed science and technology behind the CMS detector with the audience in Lisbon.

  17. John Dewey's Visits to Hawai'i

    Science.gov (United States)

    McEwan, Hunter

    2015-01-01

    John Dewey visited Hawai'i on three separate occasions. Of all three trips, by far the most important, as far as Dewey's influence on education in Hawai'i is concerned, was in 1899 when he came with his wife, Alice Chipman Dewey, to help launch the University Extension program in Honolulu. The Deweys' second trip was a very brief one--twenty years…

  18. Neuroscientists' classroom visits positively impact student attitudes.

    Directory of Open Access Journals (Sweden)

    Janet L Fitzakerley

    Full Text Available The primary recommendation of the 2010 President's Council of Advisors on Science and Technology report on K-12 education was to inspire more students so that they are motivated to study science. Scientists' visits to classrooms are intended to inspire learners and increase their interest in science, but verifications of this impact are largely qualitative. Our primary goal was to evaluate the impact of a longstanding Brain Awareness classroom visit program focused on increasing learners understanding of their own brains. Educational psychologists have established that neuroscience training sessions can improve academic performance and shift attitudes of students from a fixed mindset to a growth mindset. Our secondary goal was to determine whether short interactive Brain Awareness scientist-in-the-classroom sessions could similarly alter learners' perceptions of their own potential to learn. Teacher and student surveys were administered in 4(th-6(th grade classrooms throughout Minnesota either before or after one-hour Brain Awareness sessions that engaged students in activities related to brain function. Teachers rated the Brain Awareness program as very valuable and said that the visits stimulated students' interest in the brain and in science. Student surveys probed general attitudes towards science and their knowledge of neuroscience concepts (particularly the ability of the brain to change. Significant favorable improvements were found on 10 of 18 survey statements. Factor analyses of 4805 responses demonstrated that Brain Awareness presentations increased positive attitudes toward science and improved agreement with statements related to growth mindset. Overall effect sizes were small, consistent with the short length of the presentations. Thus, the impact of Brain Awareness presentations was positive and proportional to the efforts expended, demonstrating that short, scientist-in-the-classroom visits can make a positive contribution to

  19. Members of the Forum Engelberg visit CERN

    CERN Multimedia

    Patrice Loïez

    2002-01-01

    The Forum Engelberg is an annual interdisciplinary conference held in Engelberg, Switzerland intended to act as an international platform for debate and exchange of views on key issues affecting scientific research, technology, economics and philosophy. Its President is Hubert Curien - former French Minister of Research and Space Research, and President of the CERN Council from 1994 to 1996. He is pictured here (right) alongside CERN Director-General Prof. Luciano Maiani during the visit of Forum members to CERN.

  20. Members of the Forum Engelberg visit CERN

    CERN Multimedia

    Patrice Loïez

    2002-01-01

    The Forum Engelberg is an annual interdisciplinary conference held in Engelberg, Switzerland intended to act as an international platform for debate and exchange of views on key issues affecting scientific research, technology, economics and philosophy. Its President is Hubert Curien - former French Minister of Research and Space Research, and President of the CERN Council from 1994 to 1996. This series of photos was taken during a speech he made as part of a visit to CERN.

  1. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  2. It's all change at the visit points

    CERN Multimedia

    Laëtitia Pedroso

    2011-01-01

    58,000 people visited CERN in 2010. In spite of this success, the Organization has plans to review the installations at the various visit points with a view to making the links between them clearer and, above all, making tours of the Laboratory more spectacular.   CERN Control Centre. The permanent exhibition in the Globe of Science and Innovation, the "Universe of Particles", attracts large numbers of visitors. A high-tech venue offering an overview of CERN's research goals, tools and impact throughout the world, the Globe acts as a showcase for the Laboratory. "The Globe is an ideal place to start a tour of CERN. After experiencing a virtual experiment at the heart of the Universe, visitors are keen to find out what's behind it all, to know more about the research we do here at CERN.When it was still possible to see the LHC detectors, visitors were bowled over by their huge size. To continue to surprise them to the same extent, we are planning to reorganise the visit...

  3. Visits to Tier-1 Computing Centres

    CERN Multimedia

    Dario Barberis

    At the beginning of 2007 it became clear that an enhanced level of communication is needed between the ATLAS computing organisation and the Tier-1 centres. Most usual meetings are ATLAS-centric and cannot address the issues of each Tier-1; therefore we decided to organise a series of visits to the Tier-1 centres and focus on site issues. For us, ATLAS computing management, it is most useful to realize how each Tier-1 centre is organised, and its relation to the associated Tier-2s; indeed their presence at these visits is also very useful. We hope it is also useful for sites... at least, we are told so! The usual participation includes, from the ATLAS side: computing management, operations, data placement, resources, accounting and database deployment coordinators; and from the Tier-1 side: computer centre management, system managers, Grid infrastructure people, network, storage and database experts, local ATLAS liaison people and representatives of the associated Tier-2s. Visiting Tier-1 centres (1-4). ...

  4. ITU World Youth Forum visits CERN

    CERN Multimedia

    2009-01-01

    About 250 students selected by the International Telecommunication Union (ITU) to participate in the 2009 Youth Forum made CERN a primary destination for this year’s World Youth Forum event. The 250 students participating in the 2009 Youth Forum attend a presentation in the Globe of Science and Innovation.On Tuesday 6 October, the group visited several sites including the Microcosm exhibition and the ATLAS cavern to get a glimpse of what CERN does and the exciting science that is studied here. Since 2001 and every three years, the ITU World Forum brings together young men and women, aged 18-23, to learn about new technologies and the world around them. This year’s group included participants from one hundred and twenty-five different countries. This was the first time that the event involved a visit to CERN. When asked why CERN was a destination, Pascal Biner, organizer of the visit for ITU, explained that CERN was a necessary stop given the Forum’s base in Gen...

  5. Iranian and Kazakh representatives visit CERN

    CERN Multimedia

    2004-01-01

    On 1st and 4th March respectively, CERN received visits from Asset Issekeshev, Kazakhstan's Vice-Minister of Industry and Trade, and Reza Mansouri, Deputy Minister for Science, Research and Technology of the Islamic Republic of Iran. Asset Issekeshev and his delegation came to CERN with the aim of learning "the European way of building strong and effective ties between science and the industrial sector". Welcomed by Maximilian Metzger, CERN's Secretary-General, he visited the ATLAS assembly hall and the CLIC installations before signing the visitors' book. After a short visit to Point 5 (CMS), Reza Mansouri met CERN's Director-General, Robert Aymar, before talking to Iranian PhD students working on their theses at CERN. Asset Issekeshev, Kazakhstan's Vice-Minister of Industry and Trade, signs the visitors' book, watched by Maximilian Metzger, CERN's Secretary-General.From left to right: Mojtaba Mohammadi and Majid Hashemi (Iranian PhD students at CERN); Dr Daniel Denegri (CMS), Professor Re...

  6. Visit of the King of the Belgians

    CERN Multimedia

    Maximilien Brice

    2009-01-01

    19 février 2009 - Sa Majesté Albert II, Roi des Belges et le Ministre du Climat et de l’Energie P. Magnette visitent le site experimental de CMS au Point 5 du LHC avec le Directeur de la Recherche et de l’Informatique S. Bertolucci et le Porte-parole de la Collaboration CMS T. Virdee. Tirage 02 à 08: Sa Majesté Albert II, Roi des Belges signe le livre d'or dans le SDX5 en présence du Directeur des accélérateurs et de la technologie S. Myers et du Directeur de la recherche et de l’informatique S. Bertolucci; Tirage 09 à 22: Sa Majesté Albert II, Roi des Belges et le Ministre du Climat et de l’Energie P. Magnette visitent le tunnel du LHC avec le Chef du Projet sLHC L. Evans et K. Cornelis. Tirage 23 à 35: Sa Majesté Albert II, Roi des Belges et le Ministre du Climat et de l’Energie P. Magnette visitent la cerne expérimentale de CMS avec W. Van Doninck (VUB), D. Favart (UCL) et le Porte-parole de la Collaboration T. Virdee. Tirage 36 à 50: Welcome line au Point 5 du LHC: Accueil en t...

  7. Nobel laureate in literature visits CERN

    CERN Multimedia

    Anaïs Schaeffer

    2015-01-01

    Gao Xingjian, winner of the Nobel Prize for Literature in 2000, was invited to visit CERN as part of European Researchers’ Night. During his visit to the Laboratory, he took time out to give us a dose of his optimism.   Gao Xingjian in IdeaSquare's bus during his visit to CERN.   “The idea of bringing scientists and artists together is wonderful!” An enthusiastic first-time visitor to the Laboratory, Gao Xingjian regaled his audience with his thoughts on human reality at the conference 'Made of Shadow and Light', in which he took part on 24 September, alongside Sergio Bertolucci, CERN’s Director for Research and Computing. Interested in science since his childhood (his marks in physics and maths at school were excellent, he explains with a smile), he draws an interesting parallel between human consciousness and dark matter: “The concept of dark matter makes complete sense to me,”&nbs...

  8. [Andrologic disease detected during army medical visit].

    Science.gov (United States)

    Campodonico, Fabio; Michelazzi, Alberto; Capurro, Anna; Carmignani, Giorgio

    2003-12-01

    Aim of this study is to investigate the prevalence of andrologic diseases in young men (age 18 years) recruited for conscription in a north-western Italian region. A random sample of 1993 young men was evaluated at the Army Medical Visit Center of the Military District of Genoa. The visits were performed by the same doctor. An examination of external genitalia and secondary sex characters was made and the medical history of each conscript was recorded. Investigation procedures were standardized according to the guidelines of the WHO for the diagnosis and management of the infertile male. Andrologic disorders were found in 547 subjects (27.5%) and first diagnosed in 412 (20.7%). Specific acquired or congenital disorders are discussed. Some patients with most significant diseases were referred to the Urologic Department for second level diagnostic exams. This study underlines the role of the army medical visit as a tool for andrologic screening in young males. The military health service may be a relevant institution for postpuberal control and it could be useful to prevent future sexual and fertility problems in adult males.

  9. Special people visit the ATLAS cavern

    CERN Multimedia

    Muriel

    ATLAS has been host to many important visitors lately. Here are a selected few: Professor Stephen Hawking visits the ATLAS cavern On Tuesday 26 September 2006 the ATLAS Collaboration was honoured by a very special visit to the detector in the underground cavern. We were pleased to guide Professor Stephen Hawking, the famous cosmologist holding the post of Lucasian Professor of Mathematics at Cambridge University (position held by Isaac Newton in the 17th century), on a tour of the ATLAS pit and the LHC tunnel. The visit was accompanied by a few colleagues from the CERN Theory group, and was only possible thanks to the professional assistance of Olga Beltramello and Bernard Lebegue, who had also taken care of all the necessary preparatory work in the cavern. Professor Hawking was very keen to check for himself the status of the detector installation, and he admired, in particular, the spectacular TGC big wheel on side C. (left) Stephen Hawking in the ATLAS cavern side-C (right) and in the LHC tunnel...

  10. 76 FR 20718 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2011-04-13

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML..., rosters, test scores, student awards, and disciplinary documents. 11. Department of Housing and Urban...

  11. 76 FR 18457 - Regulatory Review Schedule; Tribal Consultation

    Science.gov (United States)

    2011-04-04

    ... that the NIGC provide tribal gaming commissions access to licensing information via an online database... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule; Tribal Consultation AGENCY: National Indian Gaming Commission. ACTION: Notice of Regulatory...

  12. 77 FR 35355 - User Fee Schedule for Trade Promotion Services

    Science.gov (United States)

    2012-06-13

    ...-XA17 User Fee Schedule for Trade Promotion Services AGENCY: U.S. & Foreign Commercial Service... promotion services under the current fee structure. ITA provides a wide range of trade promotion information... these more intensive trade promotion services. The fee revenue is expected to continue to contribute to...

  13. A stochastic simulation approach for production scheduling and ...

    African Journals Online (AJOL)

    International Journal of Engineering, Science and Technology ... management decisions related to production scheduling and investment planning. ... and indicate the value of promoting an information culture in the entire work forces. ... to support decision making in a BPR (Business Processes Re-engineering) scenario.

  14. 76 FR 57681 - Modification of Interlibrary Loan Fee Schedule

    Science.gov (United States)

    2011-09-16

    ... through the National Technical Information Service (NTIS) or payment through the Online Computer Library... in order to support the current cost of providing the service and will enable customers to estimate... Service 7 CFR Part 505 RIN 0518-8AA04 Modification of Interlibrary Loan Fee Schedule AGENCY: Agricultural...

  15. 76 FR 6635 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2011-02-07

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML... lists the organizational unit(s) accumulating the records or indicates agency- wide applicability in the...

  16. 75 FR 8751 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2010-02-25

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML... lists the organizational unit(s) accumulating the records or indicates agency- wide applicability in the...

  17. 75 FR 11200 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2010-03-10

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML..., this public notice lists the organizational unit(s) accumulating the records or indicates agency- wide...

  18. 76 FR 22924 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2011-04-25

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML... lists the organizational unit(s) accumulating the records or indicates agency- wide applicability in the...

  19. 77 FR 37443 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2012-06-21

    ... an electronic information system used to track review action assignments and customer satisfaction... disposal or reduce the retention period of records already authorized for disposal. NARA invites public... accumulation, agency records managers prepare schedules proposing retention periods for records and submit...

  20. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  1. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  2. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  3. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  4. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  5. THE USE OF INDUSTRIAL VISITS TO ENHANCE LEARNING AT ENGINEERING COURSES

    Directory of Open Access Journals (Sweden)

    TIRUNELVELI N. P. PADMESH

    2013-04-01

    Full Text Available Industrial visits represent an important activity in any engineering undergraduate programme that contributes to the achievement of various essential learning outcomes and programme objectives. This paper reports on an attempt to make the industrial visit an integral part of the Engineering Design and Communication course. This is achieved through identifying learning outcomes and a suitable industrial site to achieve them. For this purpose a thermal power plant was indentified as a site to be visited by students. The visit was planned to help students to achieve the learning outcomes. A number of questions in form of surveys, related to the learning outcomes, were prepared and given to the students to answer. The pre-visit, after-visit, and post-visit surveys were aimed at priming the minds of the students, gauging the level of satisfaction, and assessing the level of retention of knowledge, respectively. Students found this method very useful and they were able to remember a fair bit of information after about semester from the trip date. Our assessment of this exercise is the objectives have been achieved.

  6. National and Regional Representativeness of Hospital Emergency Department Visit Data in the National Syndromic Surveillance Program, United States, 2014

    Science.gov (United States)

    Coates, Ralph J.; Pérez, Alejandro; Baer, Atar; Zhou, Hong; English, Roseanne; Coletta, Michael; Dey, Achintya

    2016-01-01

    Objective We examined the representativeness of the nonfederal hospital emergency department (ED) visit data in the National Syndromic Surveillance Program (NSSP). Methods We used the 2012 American Hospital Association Annual Survey Database, other databases, and information from state and local health departments participating in the NSSP about which hospitals submitted data to the NSSP in October 2014. We compared ED visits for hospitals submitting 15 data with all ED visits in all 50 states and Washington, DC. Results Approximately 60.4 million of 134.6 million ED visits nationwide (~45%) were reported to have been submitted to the NSSP. ED visits in 5 of 10 regions and the majority of the states were substantially underrepresented in the NSSP. The NSSP ED visits were similar to national ED visits in terms of many of the characteristics of hospitals and their service areas. However, visits in hospitals with the fewest annual ED visits, in rural trauma centers, and in hospitals serving populations with high percentages of Hispanics and Asians were underrepresented. Conclusions NSSP nonfederal hospital ED visit data were representative for many hospital characteristics and in some geographic areas but were not very representative nationally and in many locations. Representativeness could be improved by increasing participation in more states and among specific types of hospitals. PMID:26883318

  7. Predictors of Treatment Response in Depressed Mothers Receiving In-Home Cognitive-Behavioral Therapy and Concurrent Home Visiting

    Science.gov (United States)

    Ammerman, Robert T.; Peugh, James L.; Putnam, Frank W.; Van Ginkel, Judith B.

    2012-01-01

    Home visiting is a child abuse prevention strategy that seeks to optimize child development by providing mothers with support, training, and parenting information. Research has consistently found high rates of depression in mothers participating in home visiting programs and low levels of obtaining mental health treatment in the community.…

  8. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  9. Joint Network Coding and Opportunistic Scheduling for the Bidirectional Relay Channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-05-27

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users’ transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited.

  10. Joint Network Coding and Opportunistic Scheduling for the Bidirectional Relay Channel

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein; Alouini, Mohamed-Slim; Zafar, Ammar

    2013-01-01

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users’ transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited.

  11. Preceptor Perceptions of Virtual Quality Assurance Experiential Site Visits.

    Science.gov (United States)

    Clarke, Cheryl L; Schott, Kathryn A; Arnold, Austin D

    2018-05-01

    Objective. To determine preceptor perceptions of the value of experiential quality assurance site visits between virtual and onsite visits, and to gauge preceptor opinions of the optimal method of site visits based on the type of visit received. Methods. Site visits (12 virtual and 17 onsite) were conducted with 29 APPE sites located at least 200 miles from campus. Participating preceptors were invited to complete an online post-visit survey adapted from a previously validated and published survey tool measuring preceptor perceptions of the value of traditional onsite visits. Results. Likert-type score averages for survey questions ranged from 4.2 to 4.6 in the virtual group and from 4.3 to 4.7 in the onsite group. No statistically significant difference was found between the two groups. Preceptors were more inclined to prefer the type of visit they received. Preceptors receiving onsite visits were also more likely to indicate no visit type preference. Conclusion. Preceptors perceived value from both onsite and virtual site visits. Preceptors who experienced virtual site visits highly preferred that methodology. This study suggests that virtual site visits may be a viable alternative for providing experiential quality assurance site visits from a preceptor's perspective.

  12. ESO Council Visits First VLT Unit Telescope Structure in Milan

    Science.gov (United States)

    1995-12-01

    As the ESO Very Large Telescope (VLT) rapidly takes on shape, Europe has just come one step closer to the realisation of its 556 million DEM astronomical showcase project. Last week, the ESO Council held its semi-annual meeting in Milan (Italy) [1]. During a break in the long agenda list, Council members had the opportunity to visit the Ansaldo factory in the outskirts of this city and to see for the first time the assembled mechanical structure of one of the four 8.2-metre VLT Unit telescopes. This Press Release is accompanied by a photo that shows the ESO Council delegates in front of the giant telescope. After a long climb up the steep staircase to the large Nasmyth platform at the side of the telescope where the astronomical instruments will later be placed, Dr. Peter Creola (Switzerland) , President of the ESO Council and a mechanics expert, grabbed the handrail and surveyed the structure with a professional eye: `I knew it was going to be big, but not that enormous!', he said. Other delegates experienced similar feelings, especially when they watched the 430 tonnes of steel in the 24-metre tall and squat structure turn smoothly and silently around the vertical axis. The Chairman of the ESO Scientific Technical Committee (STC), Dr. Johannes Andersen (Denmark) , summarized his first, close encounter with the VLT by `This is great fun!' and several of his colleague astronomers were soon seen in various corners of the vast structure, engaged in elated discussions about the first scientific investigations to be done with the VLT in two years' time. The VLT Main Structures The visit by Council took place at the invitation of Ansaldo Energia S.p.A. (Genova), EIE-European Industrial Engineering S.r.I. (Venice) and SOIMI-Societa Impianti Industriale S.p.A. (Milan), the three Italian enterprises responsible for the construction of the main structures of the VLT 8.2-metre Unit telescopes. Short speeches were given on this occasion by Drs. Ferruccio Bressani (Ansaldo

  13. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  14. Missed deadline notification in best-effort schedulers

    Science.gov (United States)

    Banachowski, Scott A.; Wu, Joel; Brandt, Scott A.

    2003-12-01

    It is common to run multimedia and other periodic, soft real-time applications on general-purpose computer systems. These systems use best-effort scheduling algorithms that cannot guarantee applications will receive responsive scheduling to meet deadline or timing requirements. We present a simple mechanism called Missed Deadline Notification (MDN) that allows applications to notify the system when they do not receive their desired level of responsiveness. Consisting of a single system call with no arguments, this simple interface allows the operating system to provide better support for soft real-time applications without any a priori information about their timing or resource needs. We implemented MDN in three different schedulers: Linux, BEST, and BeRate. We describe these implementations and their performance when running real-time applications and discuss policies to prevent applications from abusing MDN to gain extra resources.

  15. Using All-Sky Imaging to Improve Telescope Scheduling (Abstract)

    Science.gov (United States)

    Cole, G. M.

    2017-12-01

    (Abstract only) Automated scheduling makes it possible for a small telescope to observe a large number of targets in a single night. But when used in areas which have less-than-perfect sky conditions such automation can lead to large numbers of observations of clouds and haze. This paper describes the development of a "sky-aware" telescope automation system that integrates the data flow from an SBIG AllSky340c camera with an enhanced dispatch scheduler to make optimum use of the available observing conditions for two highly instrumented backyard telescopes. Using the minute-by-minute time series image stream and a self-maintained reference database, the software maintains a file of sky brightness, transparency, stability, and forecasted visibility at several hundred grid positions. The scheduling software uses this information in real time to exclude targets obscured by clouds and select the best observing task, taking into account the requirements and limits of each instrument.

  16. Opportunistic splitting for scheduling using a score-based approach

    KAUST Repository

    Rashid, Faraan

    2012-06-01

    We consider the problem of scheduling a user in a multi-user wireless environment in a distributed manner. The opportunistic splitting algorithm is applied to find the best group of users without reporting the channel state information to the centralized scheduler. The users find the best among themselves while requiring just a ternary feedback from the common receiver at the end of each mini-slot. The original splitting algorithm is modified to handle users with asymmetric channel conditions. We use a score-based approach with the splitting algorithm to introduce time and throughput fairness while exploiting the multi-user diversity of the network. Analytical and simulation results are given to show that the modified score-based splitting algorithm works well as a fair scheduling scheme with good spectral efficiency and reduced feedback. © 2012 IEEE.

  17. 77 FR 23250 - HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations

    Science.gov (United States)

    2012-04-18

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations AGENCY: Office of the National Coordinator for Health Information... 2009 mandates that the HIT Standards Committee develop a schedule for the assessment of policy...

  18. 76 FR 25355 - HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations AGENCY: Office of the National Coordinator for Health Information... 2009 mandates that the HIT Standards Committee develop a schedule for the assessment of policy...

  19. 78 FR 29134 - HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations

    Science.gov (United States)

    2013-05-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations AGENCY: Office of the National Coordinator for Health Information... 2009 mandates that the HIT Standards Committee develop a schedule for the assessment of policy...

  20. Implementation of Compressed Work Schedules: Participation and Job Redesign as Critical Factors for Employee Acceptance.

    Science.gov (United States)

    Latack, Janina C.; Foster, Lawrence W.

    1985-01-01

    Analyzes the effects of an implementation of a three-day/thirty-eight hour (3/38) work schedule among information systems personnel (N=84). Data showed that 18 months after implementation, 3/38 employees still strongly favor the compressed schedule. Data also suggest substantial organizational payoffs including reductions in sick time, overtime,…