WorldWideScience

Sample records for scheduling contact information

  1. Staff Scheduling for Inbound Call and Customer Contact Centers

    OpenAIRE

    Fukunaga, Alex; Hamilton, Ed; Fama, Jason; Andre, David; Matan, Ofer; Nourbakhsh, Illah

    2002-01-01

    The staff scheduling problem is a critical problem in the call center (or, more generally, customer contact center) industry. This article describes DIRECTOR, a staff scheduling system for contact centers. DIRECTOR is a constraint-based system that uses AI search techniques to generate schedules that satisfy and optimize a wide range of constraints and service-quality metrics. DIRECTOR has successfully been deployed at more than 800 contact centers, with significant measurable benefits, some ...

  2. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  3. 48 CFR 49.602-3 - Schedule of accounting information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Schedule of accounting information. 49.602-3 Section 49.602-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... accounting information. Standard Form 1439, Schedule of Accounting Information, shall be filed in support of...

  4. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  5. 2 CFR 225.55 - Information contact.

    Science.gov (United States)

    2010-01-01

    ... information concerning this part may be obtained by contacting the Office of Federal Financial Management, Financial Standards and Reporting Branch, Office of Management and Budget, Washington, DC 20503, telephone... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Information contact. 225.55 Section 225.55...

  6. 76 FR 20718 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2011-04-13

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML..., rosters, test scores, student awards, and disciplinary documents. 11. Department of Housing and Urban...

  7. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  8. 76 FR 6635 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2011-02-07

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML... lists the organizational unit(s) accumulating the records or indicates agency- wide applicability in the...

  9. 75 FR 8751 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2010-02-25

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML... lists the organizational unit(s) accumulating the records or indicates agency- wide applicability in the...

  10. 75 FR 11200 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2010-03-10

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML..., this public notice lists the organizational unit(s) accumulating the records or indicates agency- wide...

  11. 76 FR 22924 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2011-04-25

    ...: You may request a copy of any records schedule identified in this notice by contacting the Life Cycle... request. FOR FURTHER INFORMATION CONTACT: Laurence Brewer, Director, Life Cycle Management Division (NWML... lists the organizational unit(s) accumulating the records or indicates agency- wide applicability in the...

  12. Research on information models for the construction schedule management based on the IFC standard

    Directory of Open Access Journals (Sweden)

    Weirui Xue

    2015-05-01

    Full Text Available Purpose: The purpose of this article is to study the description and extension of the Industry Foundation Classes (IFC standard in construction schedule management, which achieves the information exchange and sharing among the different information systems and stakeholders, and facilitates the collaborative construction in the construction projects. Design/methodology/approach: The schedule information processing and coordination are difficult in the complex construction project. Building Information Modeling (BIM provides the platform for exchanging and sharing information among information systems and stakeholders based on the IFC standard. Through analyzing the schedule plan, implementing, check and control, the information flow in the schedule management is reflected based on the IDEF. According to the IFC4, the information model for the schedule management is established, which not only includes the each aspect of the schedule management, but also includes the cost management, the resource management, the quality management and the risk management. Findings: The information requirement for the construction schedule management can be summarized into three aspects: the schedule plan information, the implementing information and the check and control information. The three aspects can be described through the existing and extended entities of IFC4, and the information models are established. Originality/value: The main contribution of the article is to establish the construction schedule management information model, which achieves the information exchange and share in the construction project, and facilitates the development of the application software to meet the requirements of the construction project.

  13. 48 CFR 53.301-1439 - Schedule of Accounting Information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Schedule of Accounting Information. 53.301-1439 Section 53.301-1439 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Illustrations of Forms 53.301-1439 Schedule of Accounting...

  14. 76 FR 10233 - Schedule of Water Charges

    Science.gov (United States)

    2011-02-24

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 420 Schedule of Water Charges AGENCY: Delaware River..., Part III, Basin Regulations--Water Supply Charges. Accordingly, the Commission's water charging rates..., 2011. Effective Date: February 24, 2011. FOR FURTHER INFORMATION CONTACT: For questions about the water...

  15. Information Flow Scheduling in Concurrent Multi-Product Development Based on DSM

    Science.gov (United States)

    Sun, Qing-Chao; Huang, Wei-Qiang; Jiang, Ying-Jie; Sun, Wei

    2017-09-01

    Multi-product collaborative development is adopted widely in manufacturing enterprise, while the present multi-project planning models don't take technical/data interactions of multiple products into account. To decrease the influence of technical/data interactions on project progresses, the information flow scheduling models based on the extended DSM is presented. Firstly, information dependencies are divided into four types: series, parallel, coupling and similar. Secondly, different types of dependencies are expressed as DSM units, and the extended DSM model is brought forward, described as a block matrix. Furthermore, the information flow scheduling methods is proposed, which involves four types of operations, where partitioning and clustering algorithm are modified from DSM for ensuring progress of high-priority project, merging and converting is the specific computation of the extended DSM. Finally, the information flow scheduling of two machine tools development is analyzed with example, and different project priorities correspond to different task sequences and total coordination cost. The proposed methodology provides a detailed instruction for information flow scheduling in multi-product development, with specially concerning technical/data interactions.

  16. Improved Scheduling Mechanisms for Synchronous Information and Energy Transmission.

    Science.gov (United States)

    Qin, Danyang; Yang, Songxiang; Zhang, Yan; Ma, Jingya; Ding, Qun

    2017-06-09

    Wireless energy collecting technology can effectively reduce the network time overhead and prolong the wireless sensor network (WSN) lifetime. However, the traditional energy collecting technology cannot achieve the balance between ergodic channel capacity and average collected energy. In order to solve the problem of the network transmission efficiency and the limited energy of wireless devices, three improved scheduling mechanisms are proposed: improved signal noise ratio (SNR) scheduling mechanism (IS2M), improved N-SNR scheduling mechanism (INS2M) and an improved Equal Throughput scheduling mechanism (IETSM) for different channel conditions to improve the whole network performance. Meanwhile, the average collected energy of single users and the ergodic channel capacity of three scheduling mechanisms can be obtained through the order statistical theory in Rayleig, Ricean, Nakagami- m and Weibull fading channels. It is concluded that the proposed scheduling mechanisms can achieve better balance between energy collection and data transmission, so as to provide a new solution to realize synchronous information and energy transmission for WSNs.

  17. Production Planning and Planting Pattern Scheduling Information System for Horticulture

    Science.gov (United States)

    Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu

    2018-02-01

    This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.

  18. 78 FR 14549 - National Contact Center; Information Collection; National Contact Center Customer Evaluation Survey

    Science.gov (United States)

    2013-03-06

    ...] National Contact Center; Information Collection; National Contact Center Customer Evaluation Survey AGENCY... National Contact Center customer evaluation surveys. In this request, the previously approved surveys have... several months. These temporary surveys will allow the National Contact Center to compare its customer...

  19. RingSys-Scheduler User`s manual. Information terminal for town monitoring; Brukermanual for RingSys-Scheduler. Informasjonsterminal for byovervaaking

    Energy Technology Data Exchange (ETDEWEB)

    Marsteen, L.

    1996-02-01

    This report is a User`s manual. It describes RingSys Scheduler, a computer system for continuous display of time series, public information and static pictures. The computer is connected to a host machine via modem and time series, and public information are automatically updated once an hour. RingSys-Scheduler is PC based. It is developed using Excel`s macro language as well as the asynchronous communication program Dynacomm`s script language. 12 figs.

  20. Real-Time Scheduling for Preventing Information Leakage with Preemption Overheads

    Directory of Open Access Journals (Sweden)

    BAEK, H.

    2017-05-01

    Full Text Available Real-time systems (RTS are characterized by tasks executing in a timely manner to meet its deadlines as a real-time constraint. Most studies of RTS have focused on these criteria as primary design points. However, recent increases in security threats to various real-time systems have shown that enhanced security support must be included as an important design point, retro-fitting such support to existing systems as necessary. In this paper, we propose a new pre-flush technique referred to as flush task reservation for FP scheduling (FTR-FP to conditionally sanitize the state of resources shared by real-time tasks by invoking a flush task (FT in order to mitigate information leakage/corruption of real-time systems. FTR-FP extends existing works exploiting FTs to be applicable more general scheduling algorithms and security model. We also propose modifications to existing real-time scheduling algorithms to implement a pre-flush technique as a security constraint, and analysis technique to verify schedulability of the real-time scheduling. For better analytic capability, our analysis technique provides a count of the precise number of preemptions that a task experiences offline. Our evaluation results demonstrate that our proposed schedulability analysis improves the performance of existing scheduling algorithms in terms of schedulability and preemption cost.

  1. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  2. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  3. 50 CFR 23.7 - What office do I contact for CITES information?

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What office do I contact for CITES... FAUNA AND FLORA (CITES) Introduction § 23.7 What office do I contact for CITES information? Contact the following offices to receive information about CITES: Type of information Office to contact (a) CITES...

  4. 77 FR 42332 - Large Power Transformers From Korea; Revised Schedule for the Subject Investigation

    Science.gov (United States)

    2012-07-18

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1189 (Final)] Large Power Transformers From Korea; Revised Schedule for the Subject Investigation AGENCY: United States International Trade Commission. ACTION: Notice. DATES: Effective Date: July 12, 2012. FOR FURTHER INFORMATION CONTACT: Edward...

  5. Health Information Sources, Perceived Vaccination Benefits, and Maintenance of Childhood Vaccination Schedules.

    Science.gov (United States)

    Hwang, Juwon; Shah, Dhavan V

    2018-06-05

    Parental concerns over the safety or necessity of childhood vaccination have increased over the past decades. At the same time, there has been a proliferation of vaccine-related information available through a range of health information sources. This study investigates the associations between evaluations of health information sources, parental perceptions of childhood vaccination benefits, and the maintenance of vaccination schedules for their children. Specifically, this study aims to (a) incorporate social media into the battery of health information sources and (b) differentiate households with a childhood autism diagnosis and those without, given unsubstantiated but persistent concerns about vaccine safety and autism. Analyzing a sample of U.S. households, a total of 4,174 parents who have at least one child under the age of 18 were analyzed, including 138 of parents of households with a childhood autism diagnosis. Results show that the more the parents value interpersonal communication and magazines as sources of health information, the more they perceive vaccination benefits, and the more the value they put on television, the better they keep vaccination schedules up-to-date for their children. On the other hand, social media are negatively associated with their perceptions of vaccination benefits. Although parents of children diagnosed with autism are less likely to perceive vaccination benefits, no interaction effects with evaluations of health information sources are found on parental perceptions of vaccination benefits or maintenance of schedules.

  6. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  7. 14 CFR 291.45 - BTS Schedule T-100, U.S. Air Carrier Traffic and Capacity Data by Nonstop Segment and On-Flight...

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false BTS Schedule T-100, U.S. Air Carrier... CARGO OPERATIONS IN INTERSTATE AIR TRANSPORTATION Reporting Rules § 291.45 BTS Schedule T-100, U.S. Air... questions about reporting a joint-service operation, contact the BTS Assistant Director—Airline Information...

  8. 76 FR 78950 - FBI Criminal Justice Information Services Division; Revised User Fee Schedule

    Science.gov (United States)

    2011-12-20

    ... amounts for volunteers, as explained at 75 FR 18752, and Centralized Billing Service Providers (CBSPs), as... Information Services Division; Revised User Fee Schedule AGENCY: Federal Bureau of Investigation (FBI.... Enourato, Section Chief, Resources Management Section, Criminal Justice Information Services Division, FBI...

  9. Combining Multiple Forms Of Visual Information To Specify Contact Relations In Spatial Layout

    Science.gov (United States)

    Sedgwick, Hal A.

    1990-03-01

    An expert system, called Layout2, has been described, which models a subset of available visual information for spatial layout. The system is used to examine detailed interactions between multiple, partially redundant forms of information in an environment-centered geometrical model of an environment obeying certain rather general constraints. This paper discusses the extension of Layout2 to include generalized contact relations between surfaces. In an environment-centered model, the representation of viewer-centered distance is replaced by the representation of environmental location. This location information is propagated through the representation of the environment by a network of contact relations between contiguous surfaces. Perspective information interacts with other forms of information to specify these contact relations. The experimental study of human perception of contact relations in extended spatial layouts is also discussed. Differences between human results and Layout2 results reveal limitations in the human ability to register available information; they also point to the existence of certain forms of information not yet formalized in Layout2.

  10. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  11. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  12. Contact Us About Managing the Quality of Environmental Information

    Science.gov (United States)

    The contact us form for the EPA Quality Program regarding quality management activities for all environmental data collection and environmental technology programs performed by or for the Agency and the EPA Information Quality Guidelines.

  13. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  14. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  15. Scheduling Data Access in Smart Grid Networks Utilizing Context Information

    DEFF Research Database (Denmark)

    Findrik, Mislav; Grønbæk, Jesper; Olsen, Rasmus Løvenstein

    2014-01-01

    Current electrical grid is facing increased penetration of intermittent energy resources, in particular wind and solar energy. Fast variability of the power supply due to renewable energy resources can be balanced out using different energy storage systems or shifting the loads. Efficiently...... managing this fast flexibility requires two-way data exchange between a controller and sensors/meters via communication networks. In this paper we investigated scheduling of data collection utilizing meta-data from sensors that are describing dynamics of information. We show the applicability...

  16. NRC Information No. 88-98: Electrical relay degradation caused by oxidation of contact surfaces

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    The NRC staff was recently informed by Clinton Power Station that a reactor scram on June 24, 1988, was caused by an electrical relay failure from oxide buildup on relay contact surfaces. Other information on relay failure from contact oxidation indicates that this problem may be more prevalent than previously thought. For example, a July 17, 1988, 10 CFR Part 21 report from Palo Verde, Unit 2, reported relay failures from contact oxidation that were due to the low current application of the relays. The relay contact surfaces in both of these examples are silver-nickel alloys, and both applications were for low current (i.e., milli-ampere current). Electrical relay contacts made of silver-nickel or silver-cadmium alloys will oxidize (tarnish) when used in low current applications because of the absence of contact surface sparking from the typical relay contact ''making and breaking'' functions. The sparking in the contact surfaces promotes a self-cleaning mechanism that reduces the tarnish buildup on the silver-nickel or silver-cadmium contacts. Discussions with one relay manufacturer revealed that the normal industry practice for low current circuit applications is either to use a contact surface material that will not oxidize or to compensate for the oxidation by increased maintenance activities to ensure reliability. The applied voltage may also influence contact oxidation

  17. An Arrival and Departure Time Predictor for Scheduling Communication in Opportunistic IoT

    Science.gov (United States)

    Pozza, Riccardo; Georgoulas, Stylianos; Moessner, Klaus; Nati, Michele; Gluhak, Alexander; Krco, Srdjan

    2016-01-01

    In this article, an Arrival and Departure Time Predictor (ADTP) for scheduling communication in opportunistic Internet of Things (IoT) is presented. The proposed algorithm learns about temporal patterns of encounters between IoT devices and predicts future arrival and departure times, therefore future contact durations. By relying on such predictions, a neighbour discovery scheduler is proposed, capable of jointly optimizing discovery latency and power consumption in order to maximize communication time when contacts are expected with high probability and, at the same time, saving power when contacts are expected with low probability. A comprehensive performance evaluation with different sets of synthetic and real world traces shows that ADTP performs favourably with respect to previous state of the art. This prediction framework opens opportunities for transmission planners and schedulers optimizing not only neighbour discovery, but the entire communication process. PMID:27827909

  18. An Arrival and Departure Time Predictor for Scheduling Communication in Opportunistic IoT.

    Science.gov (United States)

    Pozza, Riccardo; Georgoulas, Stylianos; Moessner, Klaus; Nati, Michele; Gluhak, Alexander; Krco, Srdjan

    2016-11-04

    In this article, an Arrival and Departure Time Predictor (ADTP) for scheduling communication in opportunistic Internet of Things (IoT) is presented. The proposed algorithm learns about temporal patterns of encounters between IoT devices and predicts future arrival and departure times, therefore future contact durations. By relying on such predictions, a neighbour discovery scheduler is proposed, capable of jointly optimizing discovery latency and power consumption in order to maximize communication time when contacts are expected with high probability and, at the same time, saving power when contacts are expected with low probability. A comprehensive performance evaluation with different sets of synthetic and real world traces shows that ADTP performs favourably with respect to previous state of the art. This prediction framework opens opportunities for transmission planners and schedulers optimizing not only neighbour discovery, but the entire communication process.

  19. 76 FR 23860 - Financial Management Service Proposed Collection of Information: Schedule of Excess Risks

    Science.gov (United States)

    2011-04-28

    ... DEPARTMENT OF THE TREASURY Fiscal Service Financial Management Service Proposed Collection of Information: Schedule of Excess Risks AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Notice and request for comments. SUMMARY: The Financial Management Service, as part of its continuing...

  20. Centralized mission planning and scheduling system for the Landsat Data Continuity Mission

    Science.gov (United States)

    Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki

    2014-01-01

    Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.

  1. 17 CFR 289.101 - Schedule A. Information required in reports pursuant to § 289.3.

    Science.gov (United States)

    2010-04-01

    ... TO SECTION 13(a) OF THE INTERNATIONAL FINANCE CORPORATION ACT § 289.101 Schedule A. Information... allowed or paid to dealers. If any dealers are to act in the capacity of sub-underwriters and are to be...

  2. Value of information in sequential decision making: Component inspection, permanent monitoring and system-level scheduling

    International Nuclear Information System (INIS)

    Memarzadeh, Milad; Pozzi, Matteo

    2016-01-01

    We illustrate how to assess the Value of Information (VoI) in sequential decision making problems modeled by Partially Observable Markov Decision Processes (POMDPs). POMDPs provide a general framework for modeling the management of infrastructure components, including operation and maintenance, when only partial or noisy observations are available; VoI is a key concept for selecting explorative actions, with application to component inspection and monitoring. Furthermore, component-level VoI can serve as an effective heuristic for assigning priorities to system-level inspection scheduling. We introduce two alternative models for the availability of information, and derive the VoI in each of those settings: the Stochastic Allocation (SA) model assumes that observations are collected with a given probability, while the Fee-based Allocation model (FA) assumes that they are available at a given cost. After presenting these models at component-level, we investigate how they perform for system-level inspection scheduling. - Highlights: • On the Value of Information in POMDPs, for optimal exploration of systems. • A method for assessing the Value of Information of permanent monitoring. • A method for allocating inspections in systems made up by parallel POMDPs.

  3. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  4. A Practitioner Model for Increasing Eye Contact in Children With Autism.

    Science.gov (United States)

    Cook, Jennifer L; Rapp, John T; Mann, Kathryn R; McHugh, Catherine; Burji, Carla; Nuta, Raluca

    2017-05-01

    Although many teaching techniques for children with autism spectrum disorder (ASD) require the instructor to gain the child's eye contact prior to delivering an instructional demand, the literature contains notably few procedures that reliably produce this outcome. To address this problem, we evaluated the effects of a sequential model for increasing eye contact in children with ASD. The model included the following phases: contingent praise only (for eye contact), contingent edibles plus praise, stimulus prompts plus contingent edibles and praise, contingent video and praise, schedule thinning, and maintenance evaluations for up to 2 years. Results indicated that the procedures increased eye contact for 20 participants (one additional participant did not require consequences). For 16 participants, praise (alone) was not sufficient to support eye contact; however, high levels of eye contact were typically maintained with these participants when therapists used combined schedules of intermittent edibles or video and continuous praise. We discuss some limitations of this model and directions for future research on increasing eye contact for children with ASD.

  5. 78 FR 44191 - Proposed Collection of Information: Annual Financial Statement of Surety Companies-Schedule F

    Science.gov (United States)

    2013-07-23

    ... Bureau of the Fiscal Service solicits comments concerning the Form FMS-6314 ``Annual Financial Statement... described below: Title: Annual Financial Statement of Surety Companies--Schedule F. OMB Number: 1510-0012... DEPARTMENT OF THE TREASURY Fiscal Service Proposed Collection of Information: Annual Financial...

  6. Gharibi_FaceCard for Contacts and Easy Personal - Information Exchange

    OpenAIRE

    Gharibi, Wajeb; Gharibi, Gharib

    2014-01-01

    In this paper, we discuss a new contact way for exchanging personal information using mobile phones. The idea of this invention depends on allocating a special code called Gharibi Code (GC) for each personal mobile and creating a personal information file called Gharibi Face Card (GFC), which has all specified personal data of the mobile phone user. When you request someone's GC code, the other party's phone will send you the GFC of that person. We think that this approach will facilitate the...

  7. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  8. A Study on the Effect on Scheduling and Management of Surgeries with the Introduction of Excellent Medical Information.

    Science.gov (United States)

    Mei, Tsai Ching

    2016-01-01

    The services of OR play an important role in the medical business for department of surgery. The most important issue for OR is about the scheduling and management of surgeries. Good surgery schedule could elevate the utilization efficiency of OR. Therefore, the introduction of excellent medical information can both dramatically elevate the work efficiency of health care employees and reduce workload to reach win-win benefits in both management and performance.

  9. Amino acid alphabet reduction preserves fold information contained in contact interactions in proteins.

    Science.gov (United States)

    Solis, Armando D

    2015-12-01

    To reduce complexity, understand generalized rules of protein folding, and facilitate de novo protein design, the 20-letter amino acid alphabet is commonly reduced to a smaller alphabet by clustering amino acids based on some measure of similarity. In this work, we seek the optimal alphabet that preserves as much of the structural information found in long-range (contact) interactions among amino acids in natively-folded proteins. We employ the Information Maximization Device, based on information theory, to partition the amino acids into well-defined clusters. Numbering from 2 to 19 groups, these optimal clusters of amino acids, while generated automatically, embody well-known properties of amino acids such as hydrophobicity/polarity, charge, size, and aromaticity, and are demonstrated to maintain the discriminative power of long-range interactions with minimal loss of mutual information. Our measurements suggest that reduced alphabets (of less than 10) are able to capture virtually all of the information residing in native contacts and may be sufficient for fold recognition, as demonstrated by extensive threading tests. In an expansive survey of the literature, we observe that alphabets derived from various approaches-including those derived from physicochemical intuition, local structure considerations, and sequence alignments of remote homologs-fare consistently well in preserving contact interaction information, highlighting a convergence in the various factors thought to be relevant to the folding code. Moreover, we find that alphabets commonly used in experimental protein design are nearly optimal and are largely coherent with observations that have arisen in this work. © 2015 Wiley Periodicals, Inc.

  10. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  11. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  12. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  13. Contact Lens Care

    Science.gov (United States)

    ... Consumers Consumer Information by Audience For Women Contact Lens Care Share Tweet Linkedin Pin it More sharing ... www.fda.gov/medwatch Learn More about Contact Lens Care Other Tips on Contact Lenses Decorative Contact ...

  14. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  15. Region 9 Tribal Grant Program - Project Officer and Tribal Contact Information Map Service

    Science.gov (United States)

    This compilation of geospatial data is for the purpose of managing and communicating information about current EPA project officers, tribal contacts, and tribal grants, both internally and with external stakeholders.

  16. The (in)stability of 21st century orthopedic patient contact information and its implications on clinical research: A cross-sectional study.

    Science.gov (United States)

    London, Daniel A; Stepan, Jeffrey G; Goldfarb, Charles A; Boyer, Martin I; Calfee, Ryan P

    2017-04-01

    In clinical research, minimizing patients lost to follow-up is essential for data validity. Researchers can employ better methodology to prevent patient loss. We examined how orthopedic surgery patients' contact information changes over time to optimize data collection for long-term outcomes research. Patients presenting to orthopedic outpatient clinics completed questionnaires regarding methods of contact: home phone, cell phone, mailing address, and e-mail address. They reported currently available methods of contact, if they changed in the past 5 and 10 years, and when they changed. Differences in the rates of change among methods were assessed via Fisher's exact tests. Whether participants changed any of their contact information in the past 5 and 10 years was determined via multivariate modeling, controlling for demographic variables. Among 152 patients, 51% changed at least one form of contact information within 5 years, and 66% changed at least one form within 10 years. The rate of change for each contact method was similar over 5 (15%-28%) and 10 years (26%-41%). One patient changed all four methods of contact within the past 5 years and seven within the past 10 years. Females and younger patients were more likely to change some type of contact information. The type of contact information least likely to change over 5-10 years is influenced by demographic factors such as sex and age, with females and younger participants more likely to change some aspect of their contact information. Collecting all contact methods appears necessary to minimize patients lost to follow-up, especially as technological norms evolve.

  17. A Novel Message Scheduling Framework for Delay Tolerant Networks Routing

    KAUST Repository

    Elwhishi, Ahmed; Ho, Pin-Han; Naik, K.; Shihada, Basem

    2013-01-01

    new message scheduling framework for epidemic and two-hop forwarding routing in DTNs, such that the forwarding/dropping decision can be made at a node during each contact for either optimal message delivery ratio or message delivery delay. Extensive

  18. 12 CFR 404.9 - Schedule of fees.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Schedule of fees. 404.9 Section 404.9 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES INFORMATION DISCLOSURE Procedures for Disclosure of Records Under the Freedom of Information Act. § 404.9 Schedule of fees. (a) General. Ex-Im Bank shall...

  19. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  20. 29 CFR 42.10 - Farm labor contact persons and regional coordinators (OSHA).

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Farm labor contact persons and regional coordinators (OSHA... contact persons and regional coordinators (OSHA). (a) OSHA Area Directors shall be responsible for... taken; and (2) migrant farmworker camp inspections are scheduled promptly. (b) OSHA Area Directors shall...

  1. Transmission Scheduling and Routing Algorithms for Delay Tolerant Networks

    Science.gov (United States)

    Dudukovich, Rachel; Raible, Daniel E.

    2016-01-01

    The challenges of data processing, transmission scheduling and routing within a space network present a multi-criteria optimization problem. Long delays, intermittent connectivity, asymmetric data rates and potentially high error rates make traditional networking approaches unsuitable. The delay tolerant networking architecture and protocols attempt to mitigate many of these issues, yet transmission scheduling is largely manually configured and routes are determined by a static contact routing graph. A high level of variability exists among the requirements and environmental characteristics of different missions, some of which may allow for the use of more opportunistic routing methods. In all cases, resource allocation and constraints must be balanced with the optimization of data throughput and quality of service. Much work has been done researching routing techniques for terrestrial-based challenged networks in an attempt to optimize contact opportunities and resource usage. This paper examines several popular methods to determine their potential applicability to space networks.

  2. 77 FR 12903 - 60-Day Notice of Proposed Information Collection: DS-158, Contact Information and Work History...

    Science.gov (United States)

    2012-03-02

    ..., Contact Information and Work History for Nonimmigrant Visa Applicant ACTION: Notice of request for public... History for Nonimmigrant Visa Applicant. OMB Control Number: 1405-0144. Type of Request: Extension of a... following methods: Web: Persons with access to the Internet may view and comment on this notice by going to...

  3. PLACEMENT APPLICATIONS SCHEDULING LECTURE IN INTERNATIONAL PROGRAM UNIKOM BASED ANDROID

    Directory of Open Access Journals (Sweden)

    Andri Sahata Sitanggang

    2017-12-01

    Full Text Available One who determines life of a classroom namely mapping scheduling courses especially at college. The process scheduling has included time or schedule of a class of available, room available, lecture who is scheduled for, and schedule for lecturer going to teach. Hopefully with a scheduling it will facilitate the students and teachers in obtaining information lecture schedule. With the emergence of the android application ( is implanted in mobile phones , the public can now use the internet so fast that is based .So with that researchers give one a technology based solutions to build android application .This is because one of the technology has given the functions which may make it easier for students and university lecturers in terms of access to information. In building this application used method of the prototype consisting 2 access namely access user and admin , where module user consisting of modules register , login , scheduling module , while for admin given module login , register and arrangement information scheduling courses both the administration and lecturers .Application made will be integrated with internet so that this program is real-time application.

  4. 76 FR 28194 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2011-05-16

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  5. 75 FR 27228 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2010-05-14

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  6. A Market-Based Approach to Multi-factory Scheduling

    Science.gov (United States)

    Vytelingum, Perukrishnen; Rogers, Alex; MacBeth, Douglas K.; Dutta, Partha; Stranjak, Armin; Jennings, Nicholas R.

    In this paper, we report on the design of a novel market-based approach for decentralised scheduling across multiple factories. Specifically, because of the limitations of scheduling in a centralised manner - which requires a center to have complete and perfect information for optimality and the truthful revelation of potentially commercially private preferences to that center - we advocate an informationally decentralised approach that is both agile and dynamic. In particular, this work adopts a market-based approach for decentralised scheduling by considering the different stakeholders representing different factories as self-interested, profit-motivated economic agents that trade resources for the scheduling of jobs. The overall schedule of these jobs is then an emergent behaviour of the strategic interaction of these trading agents bidding for resources in a market based on limited information and their own preferences. Using a simple (zero-intelligence) bidding strategy, we empirically demonstrate that our market-based approach achieves a lower bound efficiency of 84%. This represents a trade-off between a reasonable level of efficiency (compared to a centralised approach) and the desirable benefits of a decentralised solution.

  7. Flexible Scheduling May Have a Positive Impact on School Library Circulation. A Review of: Gavigan, K., Pribesh, S., & Dickinson, G. (2010. Fixed or flexible schedule? Schedule impacts and school library circulation. Library and Information Science Research, 32(2, 131-37.

    Directory of Open Access Journals (Sweden)

    Ann Medaille

    2011-03-01

    Full Text Available Objective – To determine whether a significant, positive relationship exists between flexible scheduling in elementary school library media centers and per-pupil circulation statistics.Design – Online survey.Setting – Library media centers in public elementary schools in two states of the United States.Subjects – A total of 88 elementary school library media specialists completed the survey.Methods – A 22-question online survey was created using Inquisite software. A link to the survey was sent via e-mail to a 600-person random sample of public school library media specialists whose names were drawn from the memberships of the North Carolina School Library Media Association and the Virginia Educational Media Association, with combined memberships totalling approximately 2,000. A random sample of 600 was chosen to provide a 95% confidence level with a confidence interval of plus or minus three points. The survey included questions about school schedules (flexible, partially flexible, or fixed, collection size, circulation statistics, total student enrolment, school type (elementary, middle, or high, school location (urban, rural, or suburban, percentage of students eligible for free and reduced price lunch, numbers of full-time professional library media specialists employed at the school, access procedures, and library closure information. The survey response rate was 29.3% (176 respondents. Because fixed versus flexible scheduling is an issue that primarily affects elementary schools, the authors further narrowed their subject pool to 88 elementary school respondents. Data were analyzed using SPSS 16.0 statistical software. Correlation analysis, including the analysis of covariance (ANCOVA, was used to compare differences in the three scheduling types and to control for other variables (such as location, socioeconomic status, collection size, staffing, days closed, and others that may affect circulation.Main Results – Of the 88

  8. Optimal contact definition for reconstruction of Contact Maps

    Directory of Open Access Journals (Sweden)

    Stehr Henning

    2010-05-01

    Full Text Available Abstract Background Contact maps have been extensively used as a simplified representation of protein structures. They capture most important features of a protein's fold, being preferred by a number of researchers for the description and study of protein structures. Inspired by the model's simplicity many groups have dedicated a considerable amount of effort towards contact prediction as a proxy for protein structure prediction. However a contact map's biological interest is subject to the availability of reliable methods for the 3-dimensional reconstruction of the structure. Results We use an implementation of the well-known distance geometry protocol to build realistic protein 3-dimensional models from contact maps, performing an extensive exploration of many of the parameters involved in the reconstruction process. We try to address the questions: a to what accuracy does a contact map represent its corresponding 3D structure, b what is the best contact map representation with regard to reconstructability and c what is the effect of partial or inaccurate contact information on the 3D structure recovery. Our results suggest that contact maps derived from the application of a distance cutoff of 9 to 11Å around the Cβ atoms constitute the most accurate representation of the 3D structure. The reconstruction process does not provide a single solution to the problem but rather an ensemble of conformations that are within 2Å RMSD of the crystal structure and with lower values for the pairwise average ensemble RMSD. Interestingly it is still possible to recover a structure with partial contact information, although wrong contacts can lead to dramatic loss in reconstruction fidelity. Conclusions Thus contact maps represent a valid approximation to the structures with an accuracy comparable to that of experimental methods. The optimal contact definitions constitute key guidelines for methods based on contact maps such as structure prediction through

  9. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  10. Gram negative bacteria and contact lens induced acute red eye

    Directory of Open Access Journals (Sweden)

    Sankaridurg Padmaja

    1996-01-01

    Full Text Available Two patients using hydrogel contact lenses on a daily wear schedule slept overnight with the lenses and woke up with a Contact Lens Induced Acute Red Eye (CLARE. The contact lenses recovered aseptically at the time of the event grew significant colonies of Pseudomonas aeruginosa and Aeromonas hydrophila in patient A and Pseudomonas aeruginosa and Serratia liquefaciens from patient B. Similar organisams from the contact lenses were recovered from the lens case and lens care solutions of patient B. In both the patients the condition resolved on discontinuation of lens wear. Patient compliance as a requirement for successful contact lens wear is highlighted with the illustration of these cases.

  11. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  12. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  13. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  14. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  15. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  16. Comparison of Strategies for Signaling of Scheduling Assignments in Wireless OFDMA

    OpenAIRE

    Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niclas; Frenger, Pål; Gunnarsson, Fredrik

    2010-01-01

    This paper considers transmission of scheduling information in  OFDMA-based cellular communication systems such as 3GPP long-term  evolution (LTE). These systems provide efficient usage of radio  resources by allowing users to be scheduled dynamically in both  frequency and time. This requires considerable amounts of scheduling  information to be sent to the users.  The paper compares two basic transmission strategies: transmitting a  separate scheduling message to each user versus broadcasti...

  17. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  18. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  19. Joint opportunistic scheduling and network coding for bidirectional relay channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-07-01

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users\\' transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited. © 2013 IEEE.

  20. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  1. Downlink scheduling using non-orthogonal uplink beams

    KAUST Repository

    Eltayeb, Mohammed E.

    2014-04-01

    Opportunistic schedulers rely on the feedback of the channel state information of users in order to perform user selection and downlink scheduling. This feedback increases with the number of users, and can lead to inefficient use of network resources and scheduling delays. We tackle the problem of feedback design, and propose a novel class of nonorthogonal codes to feed back channel state information. Users with favorable channel conditions simultaneously transmit their channel state information via non-orthogonal beams to the base station. The proposed formulation allows the base station to identify the strong users via a simple correlation process. After deriving the minimum required code length and closed-form expressions for the feedback load and downlink capacity, we show that i) the proposed algorithm reduces the feedback load while matching the achievable rate of full feedback algorithms operating over a noiseless feedback channel, and ii) the proposed codes are superior to the Gaussian codes.

  2. Downlink scheduling using non-orthogonal uplink beams

    KAUST Repository

    Eltayeb, Mohammed E.; Al-Naffouri, Tareq Y.; Bahrami, Hamid Reza Talesh

    2014-01-01

    Opportunistic schedulers rely on the feedback of the channel state information of users in order to perform user selection and downlink scheduling. This feedback increases with the number of users, and can lead to inefficient use of network resources and scheduling delays. We tackle the problem of feedback design, and propose a novel class of nonorthogonal codes to feed back channel state information. Users with favorable channel conditions simultaneously transmit their channel state information via non-orthogonal beams to the base station. The proposed formulation allows the base station to identify the strong users via a simple correlation process. After deriving the minimum required code length and closed-form expressions for the feedback load and downlink capacity, we show that i) the proposed algorithm reduces the feedback load while matching the achievable rate of full feedback algorithms operating over a noiseless feedback channel, and ii) the proposed codes are superior to the Gaussian codes.

  3. Informing disease models with temporal and spatial contact structure among GPS-collared individuals in wild populations.

    Directory of Open Access Journals (Sweden)

    David M Williams

    Full Text Available Contacts between hosts are essential for transmission of many infectious agents. Understanding how contacts, and thus transmission rates, occur in space and time is critical to effectively responding to disease outbreaks in free-ranging animal populations. Contacts between animals in the wild are often difficult to observe or measure directly. Instead, one must infer contacts from metrics such as proximity in space and time. Our objective was to examine how contacts between white-tailed deer (Odocoileus virginianus vary in space and among seasons. We used GPS movement data from 71 deer in central New York State to quantify potential direct contacts between deer and indirect overlap in space use across time and space. Daily probabilities of direct contact decreased from winter (0.05-0.14, to low levels post-parturition through summer (0.00-0.02, and increased during the rut to winter levels. The cumulative distribution for the spatial structure of direct and indirect contact probabilities around a hypothetical point of occurrence increased rapidly with distance for deer pairs separated by 1,000 m-7,000 m. Ninety-five percent of the probabilities of direct contact occurred among deer pairs within 8,500 m of one another, and 99% within 10,900 m. Probabilities of indirect contact accumulated across greater spatial extents: 95% at 11,900 m and 99% at 49,000 m. Contacts were spatially consistent across seasons, indicating that although contact rates differ seasonally, they occur proportionally across similar landscape extents. Distributions of contact probabilities across space can inform management decisions for assessing risk and allocating resources in response.

  4. Joint Network Coding and Opportunistic Scheduling for the Bidirectional Relay Channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-05-27

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users’ transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited.

  5. Joint Network Coding and Opportunistic Scheduling for the Bidirectional Relay Channel

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein; Alouini, Mohamed-Slim; Zafar, Ammar

    2013-01-01

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users’ transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited.

  6. 77 FR 66909 - Notification of Contact Information Change for the Benghazi Accountability Review Board

    Science.gov (United States)

    2012-11-07

    ... DEPARTMENT OF STATE [Public Notice 8080] Notification of Contact Information Change for the Benghazi Accountability Review Board SUMMARY: On October 1, 2012, the Department of State announced the formation of the Benghazi Accountability Review Board (ARB) in the Federal Register (FR Doc. 2012-24504...

  7. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  8. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  9. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  10. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  11. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  12. 12 CFR 404.16 - Schedule of fees.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Schedule of fees. 404.16 Section 404.16 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES INFORMATION DISCLOSURE Access to Records Under the Privacy Act of 1974 § 404.16 Schedule of fees. (a) Search and review. Ex-Im Bank shall not charge for...

  13. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  14. 77 FR 32433 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2012-06-01

    ... 1703 Proposed FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice... Defense Nuclear Facilities Safety Board is publishing its proposed Freedom of Information Act (FOIA) Fee.... on or before July 2, 2012. ADDRESSES: Comments on the proposed fee schedule should be mailed or...

  15. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  16. Genetic algorithm to solve the problems of lectures and practicums scheduling

    Science.gov (United States)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  17. Sharing Data for Production Scheduling Using the ISA-95 Standard

    Energy Technology Data Exchange (ETDEWEB)

    Harjunkoski, Iiro, E-mail: iiro.harjunkoski@de.abb.com; Bauer, Reinhard [ABB Corporate Research, Industrial Software and Applications, Ladenburg (Germany)

    2014-10-21

    In the development and deployment of production scheduling solutions, one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment, and other resources are necessary for producing a realistic short-term production plan. Currently, a widely accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data exchange for scheduling solutions.

  18. Sharing Data for Production Scheduling Using the ISA-95 Standard

    International Nuclear Information System (INIS)

    Harjunkoski, Iiro; Bauer, Reinhard

    2014-01-01

    In the development and deployment of production scheduling solutions, one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment, and other resources are necessary for producing a realistic short-term production plan. Currently, a widely accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data exchange for scheduling solutions.

  19. Sharing data for production scheduling using the ISA-95 standard

    Directory of Open Access Journals (Sweden)

    Iiro eHarjunkoski

    2014-10-01

    Full Text Available In the development and deployment of production scheduling solutions one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment and other resources are necessary for producing a realistic short-term production plan. Currently, a widely-accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data-exchange for scheduling solutions.

  20. 78 FR 58608 - Proposed Collection; Comment Request for the EFTPS Primary Contact Information Change Form

    Science.gov (United States)

    2013-09-24

    ... form is being submitted for renewal purposes only. Type of Review: Extension of a currently approved... EFTPS Primary Contact Information Change Form AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies...

  1. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  2. Scheduling Broadcasts in a Network of Timelines

    KAUST Repository

    Manzoor, Emaad A.

    2015-05-12

    Broadcasts and timelines are the primary mechanism of information exchange in online social platforms today. Services like Facebook, Twitter and Instagram have enabled ordinary people to reach large audiences spanning cultures and countries, while their massive popularity has created increasingly competitive marketplaces of attention. Timing broadcasts to capture the attention of such geographically diverse audiences has sparked interest from many startups and social marketing gurus. However, formal study is lacking on both the timing and frequency problems. In this thesis, we introduce, motivate and solve the broadcast scheduling problem of specifying the timing and frequency of publishing content to maximise the attention received. We validate and quantify three interacting behavioural phenomena to parametrise social platform users: information overload, bursty circadian rhythms and monotony aversion, which is defined here for the first time. Our analysis of the influence of monotony refutes the common assumption that posts on social network timelines are consumed piecemeal independently. Instead, we reveal that posts are consumed in chunks, which has important consequences for any future work considering human behaviour over social network timelines. Our quantification of monotony aversion is also novel, and has applications to problems in various domains such as recommender list diversification, user satiation and variety-seeking consumer behaviour. Having studied the underlying behavioural phenomena, we link schedules, timelines, attention and behaviour by formalising a timeline information exchange process. Our formulation gives rise to a natural objective function that quantifies the expected collective attention an arrangement of posts on a timeline will receive. We apply this formulation as a case-study on real-data from Twitter, where we estimate behavioural parameters, calculate the attention potential for different scheduling strategies and, using the

  3. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  4. 18 CFR 701.203 - Schedule of fees.

    Science.gov (United States)

    2010-04-01

    ... by the Public Information Officer on the basis of the balance between the benefit to the general public and the cost to the Water Resources Council. (d) Fees shall be limited to recovery of only direct... ORGANIZATION Availability of Information § 701.203 Schedule of fees. (a) The Public Information Officer will to...

  5. A decentralized scheduling algorithm for time synchronized channel hopping

    Directory of Open Access Journals (Sweden)

    Andrew Tinka

    2011-09-01

    Full Text Available Time Synchronized Channel Hopping (TSCH is an existing Medium Access Control scheme which enables robust communication through channel hopping and high data rates through synchronization. It is based on a time-slotted architecture, and its correct functioning depends on a schedule which is typically computed by a central node. This paper presents, to our knowledge, the first scheduling algorithm for TSCH networks which both is distributed and which copes with mobile nodes. Two variations on scheduling algorithms are presented. Aloha-based scheduling allocates one channel for broadcasting advertisements for new neighbors. Reservation- based scheduling augments Aloha-based scheduling with a dedicated timeslot for targeted advertisements based on gossip information. A mobile ad hoc motorized sensor network with frequent connectivity changes is studied, and the performance of the two proposed algorithms is assessed. This performance analysis uses both simulation results and the results of a field deployment of floating wireless sensors in an estuarial canal environment. Reservation-based scheduling performs significantly better than Aloha-based scheduling, suggesting that the improved network reactivity is worth the increased algorithmic complexity and resource consumption.

  6. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  7. Designing of Vague Logic Based 2-Layered Framework for CPU Scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-01-01

    Full Text Available Fuzzy based CPU scheduler has become of great interest by operating system because of its ability to handle imprecise information associated with task. This paper introduces an extension to the fuzzy based round robin scheduler to a Vague Logic Based Round Robin (VBRR scheduler. VBRR scheduler works on 2-layered framework. At the first layer, scheduler has a vague inference system which has the ability to handle the impreciseness of task using vague logic. At the second layer, Vague Logic Based Round Robin (VBRR scheduling algorithm works to schedule the tasks. VBRR scheduler has the learning capability based on which scheduler adapts intelligently an optimum length for time quantum. An optimum time quantum reduces the overhead on scheduler by reducing the unnecessary context switches which lead to improve the overall performance of system. The work is simulated using MATLAB and compared with the conventional round robin scheduler and the other two fuzzy based approaches to CPU scheduler. Given simulation analysis and results prove the effectiveness and efficiency of VBRR scheduler.

  8. Vaccinating my way--use of alternative vaccination schedules in New York State.

    Science.gov (United States)

    Nadeau, Jessica A; Bednarczyk, Robert A; Masawi, Munyaradzi R; Meldrum, Megan D; Santilli, Loretta; Zansky, Shelley M; Blog, Debra S; Birkhead, Guthrie S; McNutt, Louise-Anne

    2015-01-01

    To identify children vaccinated following an alternative vaccine schedule using immunization information system data and determine the impact of alternative schedule use on vaccine coverage. Children born in New York State, outside New York City, between January 1, 2009 and August 14, 2011 were assessed for vaccination patterns consistent with use of an alternative schedule. Children who by 9 months of age had at least 3 vaccination visits recorded in the statewide mandatory immunization information system after 41 days of age were classified as either attempting to conform to the Centers for Disease Control and Prevention published recommended vaccination schedule or an alternative schedule. The number of vaccination visits and up-to-date status at age 9 months were compared between groups. Of the 222 628 children studied, the proportion of children following an alternative schedule was 25%. These children were significantly less likely to be up-to-date at age 9 months (15%) compared with those conforming to the routine schedule (90%, P Children following an alternative schedule on average had about 2 extra vaccine visits compared with children following a routine schedule (P children in this study appear to be intentionally deviating from the routine schedule. Intentional deviation leads to poor vaccination coverage leaving children vulnerable to infection and increasing the potential for vaccine-preventable disease outbreaks. Copyright © 2015 Elsevier Inc. All rights reserved.

  9. Biometric Changes After Trabeculectomy with Contact and Non-contact Biometry.

    Science.gov (United States)

    Alvani, Azam; Pakravan, Mohammad; Esfandiari, Hamed; Yaseri, Mehdi; Yazdani, Shahin; Ghahari, Elham

    2016-02-01

    To compare biometric changes measured with contact and noncontact methods after mitomycin-C-augmented trabeculectomy. In this prospective study, 31 eyes from 31 glaucoma patients scheduled for primary trabeculectomy were enrolled. Biometric parameters including axial length (AL), anterior chamber depth (ACD), and lens thickness (LT) were measured using contact ultrasound biometry (UD-6000 Ultrasonic A/B scanner biometer; Tomey Corporation, Nagoya, Japan) and a noncontact optical biometry device (Lenstar; Haag-Streit AG, Koeniz, Switzerland). Measurements were taken the day before trabeculectomy and then compared with measurements obtained 3 and 6 months after surgery. The AL and ACD were significantly decreased at 3 and 6 months compared with baseline values taken with each biometry method. There was a significant increase in LT measured by the Lenstar device at the 3- and 6-month follow-up. At both the 3- and 6-month follow-up, the mean AL measurement reduction with the Lenstar device was significantly lower than that of the A-scan ultrasound measurements. The mean ACD changes between the two devices were not significantly different. There is a small but significant decrease in the AL and ACD after trabeculectomy as measured with both the contact and noncontact methods. The amount of AL reduction measured is significantly smaller using the noncontact method, making it the preferable method for intraocular lens power calculation for patients who need cataract surgery combined with or after trabeculectomy. The LT measured by the Lenstar device increased significantly after the operation, which can be an early sign of the progression of cataractous changes after trabeculectomy.

  10. A novel downlink scheduling strategy for traffic communication system based on TD-LTE technology.

    Science.gov (United States)

    Chen, Ting; Zhao, Xiangmo; Gao, Tao; Zhang, Licheng

    2016-01-01

    There are many existing classical scheduling algorithms which can obtain better system throughput and user equality, however, they are not designed for traffic transportation environment, which cannot consider whether the transmission performance of various information flows could meet comprehensive requirements of traffic safety and delay tolerance. This paper proposes a novel downlink scheduling strategy for traffic communication system based on TD-LTE technology, which can perform two classification mappings for various information flows in the eNodeB: firstly, associate every information flow packet with traffic safety importance weight according to its relevance to the traffic safety; secondly, associate every traffic information flow with service type importance weight according to its quality of service (QoS) requirements. Once the connection is established, at every scheduling moment, scheduler would decide the scheduling order of all buffers' head of line packets periodically according to the instant value of scheduling importance weight function, which calculated by the proposed algorithm. From different scenario simulations, it can be verified that the proposed algorithm can provide superior differentiated transmission service and reliable QoS guarantee to information flows with different traffic safety levels and service types, which is more suitable for traffic transportation environment compared with the existing popularity PF algorithm. With the limited wireless resource, information flow closed related to traffic safety will always obtain priority scheduling right timely, which can help the passengers' journey more safe. Moreover, the proposed algorithm cannot only obtain good flow throughput and user fairness which are almost equal to those of the PF algorithm without significant differences, but also provide better realtime transmission guarantee to realtime information flow.

  11. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  12. A Novel Message Scheduling Framework for Delay Tolerant Networks Routing

    KAUST Repository

    Elwhishi, Ahmed

    2013-05-01

    Multicopy routing strategies have been considered the most applicable approaches to achieve message delivery in Delay Tolerant Networks (DTNs). Epidemic routing and two-hop forwarding routing are two well-reported approaches for delay tolerant networks routing which allow multiple message replicas to be launched in order to increase message delivery ratio and/or reduce message delivery delay. This advantage, nonetheless, is at the expense of additional buffer space and bandwidth overhead. Thus, to achieve efficient utilization of network resources, it is important to come up with an effective message scheduling strategy to determine which messages should be forwarded and which should be dropped in case of buffer is full. This paper investigates a new message scheduling framework for epidemic and two-hop forwarding routing in DTNs, such that the forwarding/dropping decision can be made at a node during each contact for either optimal message delivery ratio or message delivery delay. Extensive simulation results show that the proposed message scheduling framework can achieve better performance than its counterparts.

  13. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  14. Feasibility of computerized scheduled gradual reduction for adolescent smoking cessation.

    Science.gov (United States)

    Riley, William; Jerome, Albert; Behar, Albert; Zack, Sharon

    2002-01-01

    The purpose of this project was to modify a smoking cessation program that uses computerized scheduled gradual reduction for use with adolescent smokers and to test the feasibility of this cessation approach in group support and minimal contact modalities. Utilizing a lesson plan approach with high school marketing students in five high schools and student survey feedback, the LifeSign program was modified to be an acceptable smoking cessation program for adolescent smokers. In the first study, 17 adolescent smokers used the modified program with seven associated weekly group support sessions. At the end of treatment, 29% had quit smoking, and over half of those who continued to smoke reduced their smoking rate by 50%. In the second study, the LifeSign for Teens program was evaluated with 18 adolescent smokers in a minimal contact format. At the end of treatment, 17% had quit smoking, and mean smoking rate reductions of 43% were found among those who continued smoking. At 1-year follow-up, all subjects who had quit at posttreatment reported continuous abstinence. The results of these two small trials suggest that a computerized scheduled gradual reduction approach may be an accepted and potentially efficacious approach for smoking cessation among adolescent smokers.

  15. 76 FR 4408 - Service Contract Inventory and Corresponding Point of Contact Information Per Section 703 of...

    Science.gov (United States)

    2011-01-25

    ... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2011-0009] Service Contract Inventory and... providing the Web site address (URL) for the Service Contract Inventory and the corresponding point of... Law 111-117. FOR FURTHER INFORMATION CONTACT: Dennis Wilhite, Director, Office of Budget Execution and...

  16. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  17. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH.

    Science.gov (United States)

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-04-16

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  18. Streaming system scheduling for Xeon Phi

    OpenAIRE

    Faltín, Tomáš

    2017-01-01

    Task scheduling in operating system area is a well-known problem on traditional system architectures (NUMA, SMP). Unfortunately, it does not perform well on emerging many-core architectures, especially on Intel Xeon Phi. We collected all publicly available information about the architecture of Xeon Phi. After that, we benchmarked the Xeon Phi in order to find the missing information about its architecture. We focused especially on the information about cores and memory controllers. These are ...

  19. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  20. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  1. Columbia River Coordinated Information System (CIS); Data Catalog, 1992 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, Dick (Washington Department of Fisheries, Olympia, WA); Allen, Stan; Reece, Doug (Idaho Department of Fish and Game, Boise, ID)

    1993-05-01

    The Columbia River Coordinated Information system (CIS) Project started in 1989 to address regional data sharing. Coordinated exchange and dissemination of any data must begin with dissemination of information about those data, such as: what is available; where the data are stored; what form they exist in; who to contact for further information or access to these data. In Phase II of this Project (1991), a Data Catalog describing the contents of regional datasets and less formal data collections useful for system monitoring and evaluation projects was built to improve awareness of their existence. Formal datasets are described in a `Dataset Directory,` while collections of data are Used to those that collect such information in the `Data Item Directory.` The Data Catalog will serve regional workers as a useful reference which centralizes the institutional knowledge of many data contacts into a single source. Recommendations for improvement of the Catalog during Phase III of this Project include addressing gaps in coverage, establishing an annual maintenance schedule, and loading the contents into a PC-based electronic database for easier searching and cross-referencing.

  2. 29 CFR 1952.211 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual developed by July, 1973; (c) Management Information System, December, 1975; (d) Training in compliance...

  3. Simultaneous optimization of planning and scheduling in an oil refinery

    NARCIS (Netherlands)

    Zondervan, E.; van Boekel, T.P.J.; Fransoo, J.C.; Haan, de A.B.; Postikopoulos, E.N.; Georgiadis, M.C.; Kokossis, A.

    2011-01-01

    In earlier work we have developed and tested a scheduling model [1] in the AIMMS software. In this follow-up contribution we will develop a planning model. Next we will identify the information flow between scheduling model and the planning model. Lastly we will integrate the two models in a

  4. Applications of contact predictions to structural biology

    Directory of Open Access Journals (Sweden)

    Felix Simkovic

    2017-05-01

    Full Text Available Evolutionary pressure on residue interactions, intramolecular or intermolecular, that are important for protein structure or function can lead to covariance between the two positions. Recent methodological advances allow much more accurate contact predictions to be derived from this evolutionary covariance signal. The practical application of contact predictions has largely been confined to structural bioinformatics, yet, as this work seeks to demonstrate, the data can be of enormous value to the structural biologist working in X-ray crystallography, cryo-EM or NMR. Integrative structural bioinformatics packages such as Rosetta can already exploit contact predictions in a variety of ways. The contribution of contact predictions begins at construct design, where structural domains may need to be expressed separately and contact predictions can help to predict domain limits. Structure solution by molecular replacement (MR benefits from contact predictions in diverse ways: in difficult cases, more accurate search models can be constructed using ab initio modelling when predictions are available, while intermolecular contact predictions can allow the construction of larger, oligomeric search models. Furthermore, MR using supersecondary motifs or large-scale screens against the PDB can exploit information, such as the parallel or antiparallel nature of any β-strand pairing in the target, that can be inferred from contact predictions. Contact information will be particularly valuable in the determination of lower resolution structures by helping to assign sequence register. In large complexes, contact information may allow the identity of a protein responsible for a certain region of density to be determined and then assist in the orientation of an available model within that density. In NMR, predicted contacts can provide long-range information to extend the upper size limit of the technique in a manner analogous but complementary to experimental

  5. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  6. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH

    Directory of Open Access Journals (Sweden)

    Sukho Oh

    2018-04-01

    Full Text Available Time Slotted Channel Hopping (TSCH is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  7. 29 CFR 1952.201 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Retraining of present occupational safety and health personnel during March-May 1973; (b... legislation, August 1, 1973; (d) Regulations on variances, August 1973; (e) Management information system...

  8. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  9. Are You Sure You Want to Contact Us? Quantifying the Leakage of PII via Website Contact Forms

    Directory of Open Access Journals (Sweden)

    Starov Oleksii

    2016-01-01

    Full Text Available The majority of commercial websites provide users the ability to contact them via dedicated contact pages. In these pages, users are typically requested to provide their names, email addresses, and reason for contacting the website. This effectively makes contact pages a gateway from being anonymous or pseudonymous, i.e., identified via stateful and stateless identifiers, to being eponymous. As such, the environment where users provide their personally identifiable information (PII has to be trusted and free from intentional and unintentional information leaks. In this paper, we report on the first large-scale study of PII leakage via contact pages of the 100,000 most popular sites of the web. We develop a reliable methodology for identifying and interacting with contact forms as well as techniques that allow us to discover the leakage of PII towards thirdparties, even when that information is obfuscated. Using these methods, we witness the leakage of PII towards third-parties in a wide range of ways, including the leakage through third-party form submissions, third-party scripts that collect PII information from a first-party page, and unintended leakage through a browser’s Referer header. To recover the lost control of users over their PII, we design and develop Formlock, a browser extension that warns the user when contact forms are using PII-leaking practices, and provides the ability to comprehensively lock-down a form so that a user’s details cannot be, neither accidentally, nor intentionally, leaked to third parties

  10. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  11. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  12. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  13. Baseline development, economic risk, and schedule risk: An integrated approach

    International Nuclear Information System (INIS)

    Tonkinson, J.A.

    1994-01-01

    The economic and schedule risks of Environmental Restoration (ER) projects are commonly analyzed toward the end of the baseline development process. Risk analysis is usually performed as the final element of the scheduling or estimating processes for the purpose of establishing cost and schedule contingency. However, there is an opportunity for earlier assessment of risks, during development of the technical scope and Work Breakdown Structure (WBS). Integrating the processes of risk management and baselining provides for early incorporation of feedback regarding schedule and cost risk into the proposed scope of work. Much of the information necessary to perform risk analysis becomes available during development of the technical baseline, as the scope of work and WBS are being defined. The analysis of risk can actually be initiated early on during development of the technical baseline and continue throughout development of the complete project baseline. Indeed, best business practices suggest that information crucial to the success of a project be analyzed and incorporated into project planning as soon as it is available and usable

  14. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  15. Impact of previous extended and daily wear schedules on signs and symptoms with high Dk lotrafilcon A lenses.

    Science.gov (United States)

    Chalmers, Robin L; Dillehay, Sally; Long, Bill; Barr, Joseph T; Bergenske, Peter; Donshik, Peter; Secor, Glenda; Yoakum, John

    2005-06-01

    This study measured the impact of previous contact lens wearing schedule on the resolution of signs and contact lens-related symptoms among wearers of lotrafilcon A lenses. One hundred forty adapted low Dk daily wear (DW) and 140 adapted low Dk extended wear (EW) subjects were enrolled and examined for 1 year (overall study length is 3 years). All subjects wore lotrafilcon A lenses on a wearing schedule of up to 30 nights continuous wear with monthly replacement of lenses. Examinations were conducted at 1 week, 1, 6, and 12 months. The former EW wearers presented at baseline with significantly higher conjunctival staining and epithelial microcysts (p Dk DW and EW wearers within 1 week as did severity of dryness during the day for the former DW wearers, in part as a result of their higher prevalence at baseline in the DW group. Subjects reported redness improved significantly by the 1-month visit. Continuous wear of high Dk silicone hydrogel lenses resulted in an improvement in ocular redness and neovascularization and dryness symptoms among subjects in this trial, regardless of their previous low Dk lens-wearing schedule. All improvements in signs and symptoms were sustained through 12 months.

  16. 75 FR 6032 - National Contact Center; Submission for OMB Review; National Contact Center Customer Evaluation...

    Science.gov (United States)

    2010-02-05

    ... for OMB Review; National Contact Center Customer Evaluation Survey AGENCY: Citizen Services and Communications, Federal Consumer Information Center, GSA. ACTION: Notice of request for comments regarding a... collection requirement regarding the National Contact Center customer evaluation survey. A request for public...

  17. 29 CFR 1952.341 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Developmental schedule. 1952.341 Section 1952.341 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... State Legislature January 1975 and to become effective by May 1, 1975. (d) Management Information System...

  18. On Multiple Users Scheduling Using Superposition Coding over Rayleigh Fading Channels

    KAUST Repository

    Zafar, Ammar

    2013-02-20

    In this letter, numerical results are provided to analyze the gains of multiple users scheduling via superposition coding with successive interference cancellation in comparison with the conventional single user scheduling in Rayleigh blockfading broadcast channels. The information-theoretic optimal power, rate and decoding order allocation for the superposition coding scheme are considered and the corresponding histogram for the optimal number of scheduled users is evaluated. Results show that at optimality there is a high probability that only two or three users are scheduled per channel transmission block. Numerical results for the gains of multiple users scheduling in terms of the long term throughput under hard and proportional fairness as well as for fixed merit weights for the users are also provided. These results show that the performance gain of multiple users scheduling over single user scheduling increases when the total number of users in the network increases, and it can exceed 10% for high number of users

  19. Bacterial Colonization of Disposable Soft Contact Lenses Is Greater during Corneal Infiltrative Events than during Asymptomatic Extended Lens Wear

    OpenAIRE

    Sankaridurg, Padmaja R.; Sharma, Savitri; Willcox, Mark; Naduvilath, Thomas J.; Sweeney, Deborah F.; Holden, Brien A.; Rao, Gullapalli N.

    2000-01-01

    Microorganisms, especially gram-negative bacteria, are considered to play a role in the etiology of certain corneal infiltrative events (CIEs) observed during soft contact lens wear. This study explored the possibility of microbial colonization of soft contact lenses as a risk factor leading to CIEs. In a clinical trial conducted from March 1993 to January 1996, 330 subjects wore disposable soft contact lenses on a 6-night extended-wear and disposal schedule. During this period, 4,321 lenses ...

  20. 78 FR 14508 - Notice of Affirmation of Addition of a Treatment Schedule for Methyl Bromide Fumigation of...

    Science.gov (United States)

    2013-03-06

    ... contacting the Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Manuals Unit, 92... the Plant Protection and Quarantine Treatment Manual a treatment schedule for methyl bromide..., 2013, we are affirming the addition to the Plant Protection and Quarantine Treatment Manual of the...

  1. Missed deadline notification in best-effort schedulers

    Science.gov (United States)

    Banachowski, Scott A.; Wu, Joel; Brandt, Scott A.

    2003-12-01

    It is common to run multimedia and other periodic, soft real-time applications on general-purpose computer systems. These systems use best-effort scheduling algorithms that cannot guarantee applications will receive responsive scheduling to meet deadline or timing requirements. We present a simple mechanism called Missed Deadline Notification (MDN) that allows applications to notify the system when they do not receive their desired level of responsiveness. Consisting of a single system call with no arguments, this simple interface allows the operating system to provide better support for soft real-time applications without any a priori information about their timing or resource needs. We implemented MDN in three different schedulers: Linux, BEST, and BeRate. We describe these implementations and their performance when running real-time applications and discuss policies to prevent applications from abusing MDN to gain extra resources.

  2. Generating unit maintenance scheduling under competitive market environments

    International Nuclear Information System (INIS)

    Jin Ho Kim; Jong Bae Park; Jong Keun Park; Yeung Han Chun

    2005-01-01

    A novel approach to a generating unit maintenance scheduling problem in competitive electricity markets is presented in this paper. The objective is to develop a game-theoretic framework for analyzing strategic behaviors of generating companies (Gencos) from the standpoint of the generating unit maintenance scheduling (GMS) game and for obtaining the equilibrium solution for the GMS game. The GMS problem is formulated as a dynamic non-cooperative game with complete information. The players correspond to profit maximizing individual Gencos, and the payoff of each player is defined as the profits from the energy market. The optimal schedule is defined by Nash equilibrium (equilibriums) of the game. Numerical results for two-Genco system are used to demonstrate that the proposed framework can be successfully applied to analyzing the strategic behaviors of each Genco and to obtaining the corresponding Nash equilibrium. The result indicates that generating unit maintenance schedule is one of the major strategic behaviors whereby Genco maximize their profits in a competitive market environment. (author)

  3. Feasibility of a psychosis information intervention to improve mental health literacy for professional groups in contact with young people.

    Science.gov (United States)

    Sutton, Marie; O'Keeffe, Donal; Frawley, Timothy; Madigan, Kevin; Fanning, Felicity; Lawlor, Elizabeth; Roche, Eric; Kelly, Aine; Turner, Niall; Horenstein, Arielle; O'Callaghan, Eadbhard; Clarke, Mary

    2018-04-01

    The aim of this study was to assess the feasibility of a psychosis information intervention for professionals in contact with young people in Ireland. A quasi-experimental pre- and post-intervention design was used. One thousand and thirty-two professionals received an information intervention designed to improve mental health literacy (MHL) and confidence in providing help to people with psychosis. Seven hundred and fifty-five participants completed the Psychosis Information and Confidence Questionnaire pre- and post-intervention. The information intervention significantly improved participants': (1) knowledge of psychosis; (2) ability to recognize signs and symptoms of psychosis; (3) awareness of how to access services; and (4) confidence in providing help to people experiencing psychosis. Findings provide promising support for the intervention's feasibility and acceptability. The intervention enhanced MHL regarding psychosis among professionals in contact with young people. Further research assessing if such improvements translate to the facilitation of appropriate help seeking, the enhanced early detection of psychosis and a reduction of the duration of untreated psychosis is required. © 2017 John Wiley & Sons Australia, Ltd.

  4. 20 CFR 402.165 - Fee schedule.

    Science.gov (United States)

    2010-04-01

    ... requester for the services rendered. (i) Fee for copies of printed materials. When extra copies of printed... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Fee schedule. 402.165 Section 402.165 Employees' Benefits SOCIAL SECURITY ADMINISTRATION AVAILABILITY OF INFORMATION AND RECORDS TO THE PUBLIC...

  5. Reducing Downlink Signaling Traffic in Wireless Systems Using Mobile-Assisted Scheduling

    OpenAIRE

    Moosavi, Reza; Larsson, Erik G.

    2010-01-01

    We present an idea to reduce the part of the downlink signaling traffic in wireless multiple access systems that contains scheduling information. The theoretical basis of the scheme is that the scheduling decisions made by the base station are correlated with the CSI reports from the mobiles. This correlation can be exploited by the source coding scheme that is used to compress the scheduling maps before they are sent to the mobiles. In the proposed scheme, this idea is implemented by letting...

  6. Computer-aided resource planning and scheduling for radiological services

    Science.gov (United States)

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  7. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  8. Joint Scheduling for Dual-Hop Block-Fading Broadcast Channels

    KAUST Repository

    Zafar, Ammar

    2012-09-16

    In this paper, we propose joint user-and-hop scheduling over dual-hop block-fading broadcast channels in order to exploit multi-user diversity gains and multi-hop diversity gains all together. To achieve this objective, the first and second hops are scheduled opportunistically based on the channel state information and as a prerequisite we assume that the relay, which is half-duplex and operates using decode-and-forward, is capable of storing the received packets from the source until the channel condition of the destined user becomes good to be scheduled. We formulate the joint scheduling problem as maximizing the weighted sum of the long term achievable rates by the users under a stability constraint, which means that on the long term the rate received by the relay should equal the rate transmitted by it, in addition to constant or variable power constraints. We show that this problem is equivalent to a single-hop broadcast channel by treating the source as a virtual user with an optimal priority weight that maintains the stability constraint. We show how to obtain the source weight either off-line based on channel statistics or on real-time based on channel measurements. Furthermore, we consider special cases including the maximum sum rate scheduler and the proportional fair scheduler. We demonstrate via numerical results that our proposed joint scheduling scheme enlarges the rate region as compared with a scheme that employs multi-user scheduling alone.

  9. Multiuser Scheduling on the Downlink of an LTE Cellular System

    Directory of Open Access Journals (Sweden)

    Raymond Kwan

    2008-01-01

    Full Text Available The challenge of scheduling user transmissions on the downlink of a long-term evolution (LTE cellular communication system is addressed. In particular, a novel optimalmultiuser scheduler is proposed. Numerical results show that the system performance improves with increasing correlation among OFDMA subcarriers. It is found that only a limited amount of feedback information is needed to achieve relatively good performance. A suboptimal reduced-complexity scheduler is also proposed and shown to provide good performance. The suboptimal scheme is especially attractive when the number of users is large, in which case the complexity of the optimal scheme is high.

  10. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  11. Irrigation scheduling with the neutron probe

    International Nuclear Information System (INIS)

    Travers, P.

    1987-01-01

    The operational theory of the neutron probe is briefly outlined and its application and uses discussed in relation to determination of soil compaction and irrigation scheduling. Graphic examples are given of alluvial soil moisture profiles and how this information can be used to improve trickle irrigation in vineyards. 3 refs., 7 figs

  12. Contact mechanics: contact area and interfacial separation from small contact to full contact

    International Nuclear Information System (INIS)

    Yang, C; Persson, B N J

    2008-01-01

    We present a molecular dynamics study of the contact between a rigid solid with a randomly rough surface and an elastic block with a flat surface. The numerical calculations mainly focus on the contact area and the interfacial separation from small contact (low load) to full contact (high load). For a small load the contact area varies linearly with the load and the interfacial separation depends logarithmically on the load. For a high load the contact area approaches the nominal contact area (i.e. complete contact), and the interfacial separation approaches zero. The numerical results have been compared with analytical theory and experimental results. They are in good agreement with each other. The present findings may be very important for soft solids, e.g. rubber, or for very smooth surfaces, where complete contact can be reached at moderately high loads without plastic deformation of the solids

  13. Surgical scheduling: a lean approach to process improvement.

    Science.gov (United States)

    Simon, Ross William; Canacari, Elena G

    2014-01-01

    A large teaching hospital in the northeast United States had an inefficient, paper-based process for scheduling orthopedic surgery that caused delays and contributed to site/side discrepancies. The hospital's leaders formed a team with the goals of developing a safe, effective, patient-centered, timely, efficient, and accurate orthopedic scheduling process; smoothing the schedule so that block time was allocated more evenly; and ensuring correct site/side. Under the resulting process, real-time patient information is entered into a database during the patient's preoperative visit in the surgeon's office. The team found the new process reduced the occurrence of site/side discrepancies to zero, reduced instances of changing the sequence of orthopedic procedures by 70%, and increased patient satisfaction. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  14. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  15. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  16. Heuristic algorithms for scheduling heat-treatment furnaces of steel ...

    Indian Academy of Sciences (India)

    1Department of Management Studies, Indian Institute of Science,. Bangalore .... and scheduling, production monitoring and data capture, and management information. Southall ...... Project Report, Department of Management Studies, Indian.

  17. Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.

    Science.gov (United States)

    Gonzalez, Castor

    This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic…

  18. Weighted-SNR-based fair scheduling for uplink OFDMA

    KAUST Repository

    Ma, Yao; Leith, Alex; Alouini, Mohamed-Slim; (Sherman) Shen X., Xuemin

    2009-01-01

    rates for different users. The offline optimization technique requires to know the channel distribution information (CDI) at the scheduler. The online method uses the weight adaption combined with individual user rate tracking, which avoids the need

  19. 75 FR 28071 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2010-05-19

    ... authorized for disposal or reduce the retention period of records already authorized for disposal. NARA... this accumulation, agency records managers prepare schedules proposing retention periods for records... information concerning evaluations of enlisted personnel. Included are job ratings as well as information...

  20. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  1. Contact radiotherapy. Report of technological assessment

    International Nuclear Information System (INIS)

    Ortholan, Cecile; Melin, Nicole; Lee-Robin, Sun Hae; David, Denis Jean; Pages, Frederique; Devaud, Christine; Noel, Georges; Biga, Julie; Moty-Monnereau, Celine; Canet, Philippe; Lascols, Sylvie; Lamas, Muriel; Ramdine, Jessica; Tuil, Louise

    2008-10-01

    This report aims at assessing safety, indications, the role in therapeutic strategy, and efficiency of contact radiotherapy. It also aims at answering questions like: is the contact radiotherapy technique validated? What are the indications for contact radiotherapy? What about the efficiency and safety of contact radiotherapy? After a presentation of preliminary notions on radiotherapy (radiation types, dose, and irradiation techniques), the report presents this specific technique of contact radiotherapy: definition, devices, use recommendations, issues of radiation protection, modalities of performance of a contact radiotherapy session, and concerned pathologies. Then, based on a literature survey, this report addresses the various concerned tumours (skin, rectum, brain, breast), indicates some general information about these tumours (epidemiological data, anatomy and classification, therapeutic options, radiotherapy), and proposes an assessment of the efficiency and safety of contact radiotherapy

  2. Further Evaluation of a Practitioner Model for Increasing Eye Contact in Children With Autism.

    Science.gov (United States)

    Rapp, John T; Cook, Jennifer L; Nuta, Raluca; Balagot, Carissa; Crouchman, Kayla; Jenkins, Claire; Karim, Sidrah; Watters-Wybrow, Chelsea

    2018-02-01

    Cook et al. recently described a progressive model for teaching children with autism spectrum disorder (ASD) to provide eye contact with an instructor following a name call. The model included the following phases: contingent praise only, contingent edibles plus praise, stimulus prompts plus contingent edibles and praise, contingent video and praise, schedule thinning, generalization assessments, and maintenance evaluations. In the present study, we evaluated the extent to which modifications to the model were needed to train 15 children with ASD to engage in eye contact. Results show that 11 of 15 participants acquired eye contact with the progressive model; however, eight participants required one or more procedural modifications to the model to acquire eye contact. In addition, the four participants who did not acquire eye contact received one or more modifications. Results also show that participants who acquired eye contact with or without modifications continued to display high levels of the behavior during follow-up probes. We discuss directions for future research with and limitations of this progressive model.

  3. A trial of scheduled deep brain stimulation for Tourette syndrome: moving away from continuous deep brain stimulation paradigms.

    Science.gov (United States)

    Okun, Michael S; Foote, Kelly D; Wu, Samuel S; Ward, Herbert E; Bowers, Dawn; Rodriguez, Ramon L; Malaty, Irene A; Goodman, Wayne K; Gilbert, Donald M; Walker, Harrison C; Mink, Jonathan W; Merritt, Stacy; Morishita, Takashi; Sanchez, Justin C

    2013-01-01

    To collect the information necessary to design the methods and outcome variables for a larger trial of scheduled deep brain stimulation (DBS) for Tourette syndrome. We performed a small National Institutes of Health-sponsored clinical trials planning study of the safety and preliminary efficacy of implanted DBS in the bilateral centromedian thalamic region. The study used a cranially contained constant-current device and a scheduled, rather than the classic continuous, DBS paradigm. Baseline vs 6-month outcomes were collected and analyzed. In addition, we compared acute scheduled vs acute continuous vs off DBS. A university movement disorders center. Five patients with implanted DBS. A 50% improvement in the Yale Global Tic Severity Scale (YGTSS) total score. RESULTS Participating subjects had a mean age of 34.4 (range, 28-39) years and a mean disease duration of 28.8 years. No significant adverse events or hardware-related issues occurred. Baseline vs 6-month data revealed that reductions in the YGTSS total score did not achieve the prestudy criterion of a 50% improvement in the YGTSS total score on scheduled stimulation settings. However, statistically significant improvements were observed in the YGTSS total score (mean [SD] change, -17.8 [9.4]; P=.01), impairment score (-11.3 [5.0]; P=.007), and motor score (-2.8 [2.2]; P=.045); the Modified Rush Tic Rating Scale Score total score (-5.8 [2.9]; P=.01); and the phonic tic severity score (-2.2 [2.6]; P=.04). Continuous, off, and scheduled stimulation conditions were assessed blindly in an acute experiment at 6 months after implantation. The scores in all 3 conditions showed a trend for improvement. Trends for improvement also occurred with continuous and scheduled conditions performing better than the off condition. Tic suppression was commonly seen at ventral (deep) contacts, and programming settings resulting in tic suppression were commonly associated with a subjective feeling of calmness. This study provides

  4. 75 FR 32658 - Change of Contact Information; Technical Amendment

    Science.gov (United States)

    2010-06-09

    ... Gorski, Office of Crisis Management, Food and Drug Administration, 10903 New Hampshire Ave., Bldg. 32, rm... contacting the FDA Office of Emergency Operations, Office of Crisis Management, Office of the Commissioner...

  5. 20 CFR 416.919n - Informing the medical source of examination scheduling, report content, and signature requirements.

    Science.gov (United States)

    2010-04-01

    ... scheduling, report content, and signature requirements. 416.919n Section 416.919n Employees' Benefits SOCIAL... medical source of examination scheduling, report content, and signature requirements. The medical sources... report containing all of the elements in paragraph (c). (e) Signature requirements. All consultative...

  6. 20 CFR 404.1519n - Informing the medical source of examination scheduling, report content, and signature requirements.

    Science.gov (United States)

    2010-04-01

    ... scheduling, report content, and signature requirements. 404.1519n Section 404.1519n Employees' Benefits... medical source of examination scheduling, report content, and signature requirements. The medical sources... report containing all of the elements in paragraph (c). (e) Signature requirements. All consultative...

  7. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  8. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  9. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  10. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  11. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  12. Nonmyopic Sensor Scheduling and its Efficient Implementation for Target Tracking Applications

    Directory of Open Access Journals (Sweden)

    Morrell Darryl

    2006-01-01

    Full Text Available We propose two nonmyopic sensor scheduling algorithms for target tracking applications. We consider a scenario where a bearing-only sensor is constrained to move in a finite number of directions to track a target in a two-dimensional plane. Both algorithms provide the best sensor sequence by minimizing a predicted expected scheduler cost over a finite time-horizon. The first algorithm approximately computes the scheduler costs based on the predicted covariance matrix of the tracker error. The second algorithm uses the unscented transform in conjunction with a particle filter to approximate covariance-based costs or information-theoretic costs. We also propose the use of two branch-and-bound-based optimal pruning algorithms for efficient implementation of the scheduling algorithms. We design the first pruning algorithm by combining branch-and-bound with a breadth-first search and a greedy-search; the second pruning algorithm combines branch-and-bound with a uniform-cost search. Simulation results demonstrate the advantage of nonmyopic scheduling over myopic scheduling and the significant savings in computational and memory resources when using the pruning algorithms.

  13. 76 FR 18457 - Regulatory Review Schedule; Tribal Consultation

    Science.gov (United States)

    2011-04-04

    ... that the NIGC provide tribal gaming commissions access to licensing information via an online database... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule; Tribal Consultation AGENCY: National Indian Gaming Commission. ACTION: Notice of Regulatory...

  14. A Data Scheduling and Management Infrastructure for the TEAM Network

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.; Unwin, R.

    2009-04-01

    currently partnering with the San Diego Super Computer Center to build the data management infrastructure. Data collected from the three core protocols as well as others are currently made available through the TEAM Network portal, which provides the content management framework, the data scheduling and management framework, an administrative framework to implement and manage TEAM sites, collaborative tools and a number of tools and applications utilizing Google Map and Google Earth products. A critical element of the TEAM Network data management infrastructure is to make the data publicly available in as close to real-time as possible (the TEAM Network Data Use Policy: http://www.teamnetwork.org/en/data/policy). This requires two essential tasks to be accomplished, 1) A data collection schedule has to be planned, proposed and approved for a given TEAM site. This is a challenging process since TEAM sites are geographically distributed across the tropics and hence have different seasons where they schedule field sampling for the different TEAM protocols. Capturing this information and ensuring that TEAM sites follow the outlined legal contract is key to the data collection process and 2) A stream-lined and efficient information management system to ensure data collected from the field meet the minimum data standards (i.e. are of the highest scientific quality) and are securely transferred, archived, processed and be rapidly made publicaly available, as a finished consumable product via the TEAM Network portal. The TEAM Network is achieving these goals by implementing an end-to-end framework consisting of the Sampling Scheduler application and the Data Management Framework. Sampling Scheduler The Sampling Scheduler is a project management, calendar based portal application that will allow scientists at a TEAM site to schedule field sampling for each of the TEAM protocols implemented at that site. The sampling scheduler addresses the specific requirements established in the

  15. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  16. Scheduling and Optimization of Fault-Tolerant Embedded Systems with Transparency/Performance Trade-Offs

    DEFF Research Database (Denmark)

    Izosimov, Viacheslav; Pop, Paul; Eles, Petru

    2012-01-01

    In this article, we propose a strategy for the synthesis of fault-tolerant schedules and for the mapping of fault-tolerant applications. Our techniques handle transparency/performance trade-offs and use the faultoccurrence information to reduce the overhead due to fault tolerance. Processes...... and messages are statically scheduled, and we use process reexecution for recovering from multiple transient faults. We propose a finegrained transparent recovery, where the property of transparency can be selectively applied to processes and messages. Transparency hides the recovery actions in a selected part...... of the application so that they do not affect the schedule of other processes and messages. While leading to longer schedules, transparent recovery has the advantage of both improved debuggability and less memory needed to store the faulttolerant schedules....

  17. New aspects in allergic contact dermatitis

    DEFF Research Database (Denmark)

    Mørtz, Charlotte G; Andersen, Klaus Ejner

    2008-01-01

    PURPOSE OF REVIEW: To give selected new information on contact allergy and allergic contact dermatitis with focus on diagnostic procedures and pitfalls. RECENT FINDINGS: Recent studies dealing with common contact allergens have improved our understanding of the relationship between positive patch...... contact dermatitis. The main culprits include fragrance chemicals, preservatives, and hair dyes. We are all more or less exposed to cosmetics and topical drugs on a daily basis. The labelling requirements given in the Cosmetics Directive is of great help in tracing the causative allergenic ingredients...... tests and the clinical interpretation and consequences for the patient. SUMMARY: Nickel allergy is still the most common contact allergy in Europe in spite of full implementation of the EU Nickel Directive in 2001. Contact allergens in cosmetics and topical drugs are another common cause of allergic...

  18. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  19. Opportunistic splitting for scheduling using a score-based approach

    KAUST Repository

    Rashid, Faraan

    2012-06-01

    We consider the problem of scheduling a user in a multi-user wireless environment in a distributed manner. The opportunistic splitting algorithm is applied to find the best group of users without reporting the channel state information to the centralized scheduler. The users find the best among themselves while requiring just a ternary feedback from the common receiver at the end of each mini-slot. The original splitting algorithm is modified to handle users with asymmetric channel conditions. We use a score-based approach with the splitting algorithm to introduce time and throughput fairness while exploiting the multi-user diversity of the network. Analytical and simulation results are given to show that the modified score-based splitting algorithm works well as a fair scheduling scheme with good spectral efficiency and reduced feedback. © 2012 IEEE.

  20. Eye contact and Cross-cultural Communication

    Institute of Scientific and Technical Information of China (English)

    刘西娟

    2009-01-01

    It is commonly agreed by contemporary schohrs that it is important to understand the role of culture and its characteristics and potential impact on individuals engaged in cross-cultural communication.Nonverbal Communication often reveals basic culture traits.Eye contact,as a mediunq to convey emodon.attitudes and intention.phys an undeniably vital role in communication.The concentration of this paper is to discuss the functions of eye contact in communication,different information conveyed by eve contact on the basis of different cultures and the importance of understanding and respecting the rituals of eye contact in cross-culmral communication.

  1. A stochastic simulation approach for production scheduling and ...

    African Journals Online (AJOL)

    International Journal of Engineering, Science and Technology ... management decisions related to production scheduling and investment planning. ... and indicate the value of promoting an information culture in the entire work forces. ... to support decision making in a BPR (Business Processes Re-engineering) scenario.

  2. Effect of electrode contact area on the information content of the recorded electrogastrograms: An analysis based on Rényi entropy and Teager-Kaiser Energy

    Science.gov (United States)

    Alagumariappan, Paramasivam; Krishnamurthy, Kamalanand; Kandiah, Sundravadivelu; Ponnuswamy, Mannar Jawahar

    2017-06-01

    Electrogastrograms (EGG) are electrical signals originating from the digestive system, which are closely correlated with its mechanical activity. Electrogastrography is an efficient non-invasive method for examining the physiological and pathological states of the human digestive system. There are several factors such as fat conductivity, abdominal thickness, change in electrode surface area etc, which affects the quality of the recorded EGG signals. In this work, the effect of variations in the contact area of surface electrodes on the information content of the measured electrogastrograms is analyzed using Rényi entropy and Teager-Kaiser Energy (TKE). Two different circular cutaneous electrodes with approximate contact areas of 201.14 mm2 and 283.64 mm2, have been adopted and EGG signals were acquired using the standard three electrode protocol. Further, the information content of the measured EGG signals were analyzed using the computed values of entropy and energy. Results demonstrate that the information content of the measured EGG signals increases by 6.72% for an increase in the contact area of the surface electrode by 29.09%. Further, it was observed that the average energy increases with increase in the contact surface area. This work appears to be of high clinical significance since the accurate measurement of EGG signals without loss in its information content, is highly useful for the design of diagnostic assistance tools for automated diagnosis and mass screening of digestive disorders.

  3. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  4. Case study: Accelerated schedule for MULTI LIMS installation

    International Nuclear Information System (INIS)

    Ibsen, T.G.

    1994-05-01

    This presentation focuses on the steps taken by the Westinghouse Hanford Company to meet an accelerated schedule for configuration and implementation of the MULTI LIMS in a multiple laboratory environment. The Westinghouse Hanford Company purchased the MULTI LIMS Laboratory Information Management System in August, 1993. Hardware delivery began in October, 1993. Less than four months later, the initial configuration was released for use in two Westinghouse Hanford Company laboratories. Several major obstacles were overcome during implementation. These include information gathering for base table loading, user training, acceptance of the new system by users of a legacy system, and hardware configuration issues. In summary, steps needed to be taken to meet the accelerated implementation schedule of the MULTI LIMS at the Hanford Site. The obstacles faced were overcome through the in-depth knowledge and help of the vendor and the dedication and drive of the technical staff

  5. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  6. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  7. EpiContactTrace: an R-package for contact tracing during livestock disease outbreaks and for risk-based surveillance.

    Science.gov (United States)

    Nöremark, Maria; Widgren, Stefan

    2014-03-17

    During outbreak of livestock diseases, contact tracing can be an important part of disease control. Animal movements can also be of relevance for risk-based surveillance and sampling, i.e. both when assessing consequences of introduction or likelihood of introduction. In many countries, animal movement data are collected with one of the major objectives to enable contact tracing. However, often an analytical step is needed to retrieve appropriate information for contact tracing or surveillance. In this study, an open source tool was developed to structure livestock movement data to facilitate contact-tracing in real time during disease outbreaks and for input in risk-based surveillance and sampling. The tool, EpiContactTrace, was written in the R-language and uses the network parameters in-degree, out-degree, ingoing contact chain and outgoing contact chain (also called infection chain), which are relevant for forward and backward tracing respectively. The time-frames for backward and forward tracing can be specified independently and search can be done on one farm at a time or for all farms within the dataset. Different outputs are available; datasets with network measures, contacts visualised in a map and automatically generated reports for each farm either in HTML or PDF-format intended for the end-users, i.e. the veterinary authorities, regional disease control officers and field-veterinarians. EpiContactTrace is available as an R-package at the R-project website (http://cran.r-project.org/web/packages/EpiContactTrace/). We believe this tool can help in disease control since it rapidly can structure essential contact information from large datasets. The reproducible reports make this tool robust and independent of manual compilation of data. The open source makes it accessible and easily adaptable for different needs.

  8. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  9. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  10. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Science.gov (United States)

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  11. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Directory of Open Access Journals (Sweden)

    Jinxiang Dong

    2008-07-01

    Full Text Available There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting crosslayer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An eventdriven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN.

  12. How to Estimate Epidemic Risk from Incomplete Contact Diaries Data?

    Science.gov (United States)

    Mastrandrea, Rossana; Barrat, Alain

    2016-06-01

    Social interactions shape the patterns of spreading processes in a population. Techniques such as diaries or proximity sensors allow to collect data about encounters and to build networks of contacts between individuals. The contact networks obtained from these different techniques are however quantitatively different. Here, we first show how these discrepancies affect the prediction of the epidemic risk when these data are fed to numerical models of epidemic spread: low participation rate, under-reporting of contacts and overestimation of contact durations in contact diaries with respect to sensor data determine indeed important differences in the outcomes of the corresponding simulations with for instance an enhanced sensitivity to initial conditions. Most importantly, we investigate if and how information gathered from contact diaries can be used in such simulations in order to yield an accurate description of the epidemic risk, assuming that data from sensors represent the ground truth. The contact networks built from contact sensors and diaries present indeed several structural similarities: this suggests the possibility to construct, using only the contact diary network information, a surrogate contact network such that simulations using this surrogate network give the same estimation of the epidemic risk as simulations using the contact sensor network. We present and compare several methods to build such surrogate data, and show that it is indeed possible to obtain a good agreement between the outcomes of simulations using surrogate and sensor data, as long as the contact diary information is complemented by publicly available data describing the heterogeneity of the durations of human contacts.

  13. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  14. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  15. Using a vision cognitive algorithm to schedule virtual machines

    Directory of Open Access Journals (Sweden)

    Zhao Jiaqi

    2014-09-01

    Full Text Available Scheduling virtual machines is a major research topic for cloud computing, because it directly influences the performance, the operation cost and the quality of services. A large cloud center is normally equipped with several hundred thousand physical machines. The mission of the scheduler is to select the best one to host a virtual machine. This is an NPhard global optimization problem with grand challenges for researchers. This work studies the Virtual Machine (VM scheduling problem on the cloud. Our primary concern with VM scheduling is the energy consumption, because the largest part of a cloud center operation cost goes to the kilowatts used. We designed a scheduling algorithm that allocates an incoming virtual machine instance on the host machine, which results in the lowest energy consumption of the entire system. More specifically, we developed a new algorithm, called vision cognition, to solve the global optimization problem. This algorithm is inspired by the observation of how human eyes see directly the smallest/largest item without comparing them pairwisely. We theoretically proved that the algorithm works correctly and converges fast. Practically, we validated the novel algorithm, together with the scheduling concept, using a simulation approach. The adopted cloud simulator models different cloud infrastructures with various properties and detailed runtime information that can usually not be acquired from real clouds. The experimental results demonstrate the benefit of our approach in terms of reducing the cloud center energy consumption

  16. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  17. Collaborative Distributed Scheduling Approaches for Wireless Sensor Network

    Science.gov (United States)

    Niu, Jianjun; Deng, Zhidong

    2009-01-01

    Energy constraints restrict the lifetime of wireless sensor networks (WSNs) with battery-powered nodes, which poses great challenges for their large scale application. In this paper, we propose a family of collaborative distributed scheduling approaches (CDSAs) based on the Markov process to reduce the energy consumption of a WSN. The family of CDSAs comprises of two approaches: a one-step collaborative distributed approach and a two-step collaborative distributed approach. The approaches enable nodes to learn the behavior information of its environment collaboratively and integrate sleep scheduling with transmission scheduling to reduce the energy consumption. We analyze the adaptability and practicality features of the CDSAs. The simulation results show that the two proposed approaches can effectively reduce nodes' energy consumption. Some other characteristics of the CDSAs like buffer occupation and packet delay are also analyzed in this paper. We evaluate CDSAs extensively on a 15-node WSN testbed. The test results show that the CDSAs conserve the energy effectively and are feasible for real WSNs. PMID:22408491

  18. Sensor Transmission Power Schedule for Smart Grids

    Science.gov (United States)

    Gao, C.; Huang, Y. H.; Li, J.; Liu, X. D.

    2017-11-01

    Smart grid has attracted much attention by the requirement of new generation renewable energy. Nowadays, the real-time state estimation, with the help of phasor measurement unit, plays an important role to keep smart grid stable and efficient. However, the limitation of the communication channel is not considered by related work. Considering the familiar limited on-board batteries wireless sensor in smart grid, transmission power schedule is designed in this paper, which minimizes energy consumption with proper EKF filtering performance requirement constrain. Based on the event-triggered estimation theory, the filtering algorithm is also provided to utilize the information contained in the power schedule. Finally, its feasibility and performance is demonstrated using the standard IEEE 39-bus system with phasor measurement units (PMUs).

  19. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  20. Refining intra-protein contact prediction by graph analysis

    Directory of Open Access Journals (Sweden)

    Eyal Eran

    2007-05-01

    Full Text Available Abstract Background Accurate prediction of intra-protein residue contacts from sequence information will allow the prediction of protein structures. Basic predictions of such specific contacts can be further refined by jointly analyzing predicted contacts, and by adding information on the relative positions of contacts in the protein primary sequence. Results We introduce a method for graph analysis refinement of intra-protein contacts, termed GARP. Our previously presented intra-contact prediction method by means of pair-to-pair substitution matrix (P2PConPred was used to test the GARP method. In our approach, the top contact predictions obtained by a basic prediction method were used as edges to create a weighted graph. The edges were scored by a mutual clustering coefficient that identifies highly connected graph regions, and by the density of edges between the sequence regions of the edge nodes. A test set of 57 proteins with known structures was used to determine contacts. GARP improves the accuracy of the P2PConPred basic prediction method in whole proteins from 12% to 18%. Conclusion Using a simple approach we increased the contact prediction accuracy of a basic method by 1.5 times. Our graph approach is simple to implement, can be used with various basic prediction methods, and can provide input for further downstream analyses.

  1. 29 CFR 37.88 - Who may contact CRC about a complaint?

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Who may contact CRC about a complaint? 37.88 Section 37.88... PROVISIONS OF THE WORKFORCE INVESTMENT ACT OF 1998 (WIA) Compliance Procedures § 37.88 Who may contact CRC... contact CRC for information about the complaint. The Director will determine what information, if any...

  2. An Efficient Downlink Scheduling Strategy Using Normal Graphs for Multiuser MIMO Wireless Systems

    Science.gov (United States)

    Chen, Jung-Chieh; Wu, Cheng-Hsuan; Lee, Yao-Nan; Wen, Chao-Kai

    Inspired by the success of the low-density parity-check (LDPC) codes in the field of error-control coding, in this paper we propose transforming the downlink multiuser multiple-input multiple-output scheduling problem into an LDPC-like problem using the normal graph. Based on the normal graph framework, soft information, which indicates the probability that each user will be scheduled to transmit packets at the access point through a specified angle-frequency sub-channel, is exchanged among the local processors to iteratively optimize the multiuser transmission schedule. Computer simulations show that the proposed algorithm can efficiently schedule simultaneous multiuser transmission which then increases the overall channel utilization and reduces the average packet delay.

  3. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  4. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  5. 77 FR 23250 - HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations

    Science.gov (United States)

    2012-04-18

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations AGENCY: Office of the National Coordinator for Health Information... 2009 mandates that the HIT Standards Committee develop a schedule for the assessment of policy...

  6. 76 FR 25355 - HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations AGENCY: Office of the National Coordinator for Health Information... 2009 mandates that the HIT Standards Committee develop a schedule for the assessment of policy...

  7. 78 FR 29134 - HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations

    Science.gov (United States)

    2013-05-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee; Schedule for the Assessment of HIT Policy Committee Recommendations AGENCY: Office of the National Coordinator for Health Information... 2009 mandates that the HIT Standards Committee develop a schedule for the assessment of policy...

  8. Children with pertussis inform the investigation of other pertussis cases among contacts

    Directory of Open Access Journals (Sweden)

    Rodrigues Laura C

    2007-05-01

    Full Text Available Abstract Background The number of reported pertussis has increased in the last two decades. However, many cases of pertussis may be underreported or not diagnosed. The World Health Organization estimates that pertussis causes 200.000 – 400.000 deaths each year, most deaths are in infants and in developing countries. Infants with pertussis can indicate an undetected source cases in the community. Methods At a University Hospital in Brazil individuals that had frequent contacts with a child with confirmed pertussis (the index case and had recent history of cough were enrolled into the study. Nasopharyngeal swabs were collected from every contact that had cough within the last 21 days. Cases confirmation followed the guidelines of the Center for Disease Control and Prevention – Atlanta, U.S.A. Results Pertussis diagnosis was confirmed in 51 children, (considered the index cases. Among the index cases, 72.5% (37/51 were under 6 months of age; culture for Bordetella pertussis was positive in 78.4% (40/51. Pertussis was confirmed in 39% (107/276 of the contacts of 51 index cases. Among these contacts identified as a pertussis case, 40.2% (43/107 were between 6 months and 111/2 years of age and 59.8% (64/107 were older than 111/2 years of age. Pertussis was confirmed by culture in 11.2% (12/107 of them and by epidemiologic linkage in 88.8% (95/107. Each index case allowed identifying two new cases of pertussis. Conclusion Public health authorities should consider implementing early recognition of pertussis index cases and searching for pertussis cases among the contacts. Treatment of the cases and prophylaxis of the contacts is fundamental to control outbreaks in the community.

  9. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  10. Constraint based scheduling for the Goddard Space Flight Center distributed Active Archive Center's data archive and distribution system

    Science.gov (United States)

    Short, Nick, Jr.; Bedet, Jean-Jacques; Bodden, Lee; Boddy, Mark; White, Jim; Beane, John

    1994-01-01

    The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been operational since October 1, 1993. Its mission is to support the Earth Observing System (EOS) by providing rapid access to EOS data and analysis products, and to test Earth Observing System Data and Information System (EOSDIS) design concepts. One of the challenges is to ensure quick and easy retrieval of any data archived within the DAAC's Data Archive and Distributed System (DADS). Over the 15-year life of EOS project, an estimated several Petabytes (10(exp 15)) of data will be permanently stored. Accessing that amount of information is a formidable task that will require innovative approaches. As a precursor of the full EOS system, the GSFC DAAC with a few Terabits of storage, has implemented a prototype of a constraint-based task and resource scheduler to improve the performance of the DADS. This Honeywell Task and Resource Scheduler (HTRS), developed by Honeywell Technology Center in cooperation the Information Science and Technology Branch/935, the Code X Operations Technology Program, and the GSFC DAAC, makes better use of limited resources, prevents backlog of data, provides information about resources bottlenecks and performance characteristics. The prototype which is developed concurrently with the GSFC Version 0 (V0) DADS, models DADS activities such as ingestion and distribution with priority, precedence, resource requirements (disk and network bandwidth) and temporal constraints. HTRS supports schedule updates, insertions, and retrieval of task information via an Application Program Interface (API). The prototype has demonstrated with a few examples, the substantial advantages of using HTRS over scheduling algorithms such as a First In First Out (FIFO) queue. The kernel scheduling engine for HTRS, called Kronos, has been successfully applied to several other domains such as space shuttle mission scheduling, demand flow manufacturing, and avionics communications

  11. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  12. Optimal power system generation scheduling by multi-objective genetic algorithms with preferences

    International Nuclear Information System (INIS)

    Zio, E.; Baraldi, P.; Pedroni, N.

    2009-01-01

    Power system generation scheduling is an important issue both from the economical and environmental safety viewpoints. The scheduling involves decisions with regards to the units start-up and shut-down times and to the assignment of the load demands to the committed generating units for minimizing the system operation costs and the emission of atmospheric pollutants. As many other real-world engineering problems, power system generation scheduling involves multiple, conflicting optimization criteria for which there exists no single best solution with respect to all criteria considered. Multi-objective optimization algorithms, based on the principle of Pareto optimality, can then be designed to search for the set of nondominated scheduling solutions from which the decision-maker (DM) must a posteriori choose the preferred alternative. On the other hand, often, information is available a priori regarding the preference values of the DM with respect to the objectives. When possible, it is important to exploit this information during the search so as to focus it on the region of preference of the Pareto-optimal set. In this paper, ways are explored to use this preference information for driving a multi-objective genetic algorithm towards the preferential region of the Pareto-optimal front. Two methods are considered: the first one extends the concept of Pareto dominance by biasing the chromosome replacement step of the algorithm by means of numerical weights that express the DM' s preferences; the second one drives the search algorithm by changing the shape of the dominance region according to linear trade-off functions specified by the DM. The effectiveness of the proposed approaches is first compared on a case study of literature. Then, a nonlinear, constrained, two-objective power generation scheduling problem is effectively tackled

  13. wayGoo recommender system: personalized recommendations for events scheduling, based on static and real-time information

    Science.gov (United States)

    Thanos, Konstantinos-Georgios; Thomopoulos, Stelios C. A.

    2016-05-01

    wayGoo is a fully functional application whose main functionalities include content geolocation, event scheduling, and indoor navigation. However, significant information about events do not reach users' attention, either because of the size of this information or because some information comes from real - time data sources. The purpose of this work is to facilitate event management operations by prioritizing the presented events, based on users' interests using both, static and real - time data. Through the wayGoo interface, users select conceptual topics that are interesting for them. These topics constitute a browsing behavior vector which is used for learning users' interests implicitly, without being intrusive. Then, the system estimates user preferences and return an events list sorted from the most preferred one to the least. User preferences are modeled via a Naïve Bayesian Network which consists of: a) the `decision' random variable corresponding to users' decision on attending an event, b) the `distance' random variable, modeled by a linear regression that estimates the probability that the distance between a user and each event destination is not discouraging, ` the seat availability' random variable, modeled by a linear regression, which estimates the probability that the seat availability is encouraging d) and the `relevance' random variable, modeled by a clustering - based collaborative filtering, which determines the relevance of each event users' interests. Finally, experimental results show that the proposed system contribute essentially to assisting users in browsing and selecting events to attend.

  14. Dynamics of social contagions with limited contact capacity.

    Science.gov (United States)

    Wang, Wei; Shu, Panpan; Zhu, Yu-Xiao; Tang, Ming; Zhang, Yi-Cheng

    2015-10-01

    Individuals are always limited by some inelastic resources, such as time and energy, which restrict them to dedicate to social interaction and limit their contact capacities. Contact capacity plays an important role in dynamics of social contagions, which so far has eluded theoretical analysis. In this paper, we first propose a non-Markovian model to understand the effects of contact capacity on social contagions, in which each adopted individual can only contact and transmit the information to a finite number of neighbors. We then develop a heterogeneous edge-based compartmental theory for this model, and a remarkable agreement with simulations is obtained. Through theory and simulations, we find that enlarging the contact capacity makes the network more fragile to behavior spreading. Interestingly, we find that both the continuous and discontinuous dependence of the final adoption size on the information transmission probability can arise. There is a crossover phenomenon between the two types of dependence. More specifically, the crossover phenomenon can be induced by enlarging the contact capacity only when the degree exponent is above a critical degree exponent, while the final behavior adoption size always grows continuously for any contact capacity when degree exponent is below the critical degree exponent.

  15. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  16. Collaborative Distributed Scheduling Approaches for Wireless Sensor Network

    Directory of Open Access Journals (Sweden)

    Zhidong Deng

    2009-10-01

    Full Text Available Energy constraints restrict the lifetime of wireless sensor networks (WSNs with battery-powered nodes, which poses great challenges for their large scale application. In this paper, we propose a family of collaborative distributed scheduling approaches (CDSAs based on the Markov process to reduce the energy consumption of a WSN. The family of CDSAs comprises of two approaches: a one-step collaborative distributed approach and a two-step collaborative distributed approach. The approaches enable nodes to learn the behavior information of its environment collaboratively and integrate sleep scheduling with transmission scheduling to reduce the energy consumption. We analyze the adaptability and practicality features of the CDSAs. The simulation results show that the two proposed approaches can effectively reduce nodes’ energy consumption. Some other characteristics of the CDSAs like buffer occupation and packet delay are also analyzed in this paper. We evaluate CDSAs extensively on a 15-node WSN testbed. The test results show that the CDSAs conserve the energy effectively and are feasible for real WSNs.

  17. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  18. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  19. Using All-Sky Imaging to Improve Telescope Scheduling (Abstract)

    Science.gov (United States)

    Cole, G. M.

    2017-12-01

    (Abstract only) Automated scheduling makes it possible for a small telescope to observe a large number of targets in a single night. But when used in areas which have less-than-perfect sky conditions such automation can lead to large numbers of observations of clouds and haze. This paper describes the development of a "sky-aware" telescope automation system that integrates the data flow from an SBIG AllSky340c camera with an enhanced dispatch scheduler to make optimum use of the available observing conditions for two highly instrumented backyard telescopes. Using the minute-by-minute time series image stream and a self-maintained reference database, the software maintains a file of sky brightness, transparency, stability, and forecasted visibility at several hundred grid positions. The scheduling software uses this information in real time to exclude targets obscured by clouds and select the best observing task, taking into account the requirements and limits of each instrument.

  20. Working from 9 to 6? An analysis of in-home and out-of-home working schedules

    NARCIS (Netherlands)

    Alexander, Bayarma; Dijst, M.J.; Ettema, D.F.

    2010-01-01

    The widespread adoption of information and communication technologies (ICT) and flexible work arrangements have enabled people to schedule their work activities in more flexible ways. New forms of working have already emerged. However, research about flexible work schedules is still scarce. The

  1. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  2. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  3. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  4. Data analysis considerations for pesticides determined by National Water Quality Laboratory schedule 2437

    Science.gov (United States)

    Shoda, Megan E.; Nowell, Lisa H.; Stone, Wesley W.; Sandstrom, Mark W.; Bexfield, Laura M.

    2018-04-02

    In 2013, the U.S. Geological Survey National Water Quality Laboratory (NWQL) made a new method available for the analysis of pesticides in filtered water samples: laboratory schedule 2437. Schedule 2437 is an improvement on previous analytical methods because it determines the concentrations of 225 fungicides, herbicides, insecticides, and associated degradates in one method at similar or lower concentrations than previously available methods. Additionally, the pesticides included in schedule 2437 were strategically identified in a prioritization analysis that assessed likelihood of occurrence, prevalence of use, and potential toxicity. When the NWQL reports pesticide concentrations for analytes in schedule 2437, the laboratory also provides supplemental information useful to data users for assessing method performance and understanding data quality. That supplemental information is discussed in this report, along with an initial analysis of analytical recovery of pesticides in water-quality samples analyzed by schedule 2437 during 2013–2015. A total of 523 field matrix spike samples and their paired environmental samples and 277 laboratory reagent spike samples were analyzed for this report (1,323 samples total). These samples were collected in the field as part of the U.S. Geological Survey National Water-Quality Assessment groundwater and surface-water studies and as part of the NWQL quality-control program. This report reviews how pesticide samples are processed by the NWQL, addresses how to obtain all the data necessary to interpret pesticide concentrations, explains the circumstances that result in a reporting level change or the occurrence of a raised reporting level, and describes the calculation and assessment of recovery. This report also discusses reasons why a data user might choose to exclude data in an interpretive analysis and outlines the approach used to identify the potential for decreased data quality in the assessment of method recovery. The

  5. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  6. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  7. Distributed scheduling for autonomous vehicles by reinforcement learning; Kyoka gakushu ni yoru mujin hansosha no bunsangata scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Unoki, T.; Suetake, N. [Oki Electric Industry Co. Ltd., Tokyo (Japan)

    1997-08-20

    In this paper, we propose an autonomous vehicle scheduling schema in large physical distribution terminals publicly used as the next generation wide area physical distribution bases. This schema uses Learning Automaton for vehicles scheduling based on Contract Net Protocol, in order to obtain useful emergent behaviors of agents in the system based on the local decision-making of each agent. The state of the automaton is updated at each instant on the basis of new information that includes the arrival estimation time of vehicles. Each agent estimates the arrival time of vehicles by using Bayesian learning process. Using traffic simulation, we evaluate the schema in various simulated environments. The result shows the advantage of the schema over when each agent provides the same criteria from the top down, and each agent voluntarily generates criteria via interactions with the environment, playing an individual role in tie system. 22 refs., 5 figs., 2 tabs.

  8. Evaluation of the 12-hour shift schedule at the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Lewis, P.M.; Swaim, D.J.; Rosa, R.R.; Colligan, M.J.; Booth, R.J.; Swint, M.J.

    1986-09-01

    The objective of this report are to evaluate the effect of the change to the 12-hour/day schedule on operational performance and safety of FFTF; to evaluate the degree to which the change to the 12-hour/day schedule has met its objectives; and to gather information that may be useful to FFTF management and the US Department of Energy (DOE) in evaluating 8- and 12-hour shift schedules at other facilities. The principal conclusion of this report is that the 12-hour/day shift schedule is a reasonable alternative to an 8-hour/day schedule at FFTF. As a result of the scedule change, it seems clear that plant performance improved in two ways. The operator error rate in keeping the Technical Specification Compliance Logs was already very low on the 8-hour shift. On the 12-hour shift, the rate was even lower. Also, the operator interface with craft personnel resulted in an increase in the productivity of the craft personnel

  9. Contact detection for nanomanipulation in a scanning electron microscope

    International Nuclear Information System (INIS)

    Ru, Changhai; To, Steve

    2012-01-01

    Nanomanipulation systems require accurate knowledge of the end-effector position in all three spatial coordinates, XYZ, for reliable manipulation of nanostructures. Although the images acquired by a scanning electron microscope (SEM) provide high resolution XY information, the lack of depth information in the Z-direction makes 3D nanomanipulation time-consuming. Existing approaches for contact detection of end-effectors inside SEM typically utilize fragile touch sensors that are difficult to integrate into a nanomanipulation system. This paper presents a method for determining the contact between an end-effector and a target surface during nanomanipulation inside SEM, purely based on the processing of SEM images. A depth-from-focus method is used in the fast approach of the end-effector to the substrate, followed by fine contact detection. Experimental results demonstrate that the contact detection approach is capable of achieving an accuracy of 21.5 nm at 50,000× magnification while inducing little end-effector damage. -- Highlights: ► We presents a simple method for obtaining the depth information in SEM-based nanomanipulation. ► Detecting contact between an end-effector and a target surface using SEM as a vision sensor. ► Additional touch/force sensors or specialized hardware need not be added. ► Achieved high repeatability and accuracy. ► Complete automatic contact detection within typically 60 s.

  10. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  11. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  12. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  13. Home Health Care for California's Injured Workers: Options for Implementing a Fee Schedule.

    Science.gov (United States)

    Wynn, Barbara O; Boustead, Anne

    2015-07-15

    The California Department of Industrial Relations/Division of Worker's Compensation asked RAND to provide technical assistance in developing a fee schedule for home health services provided to injured workers. The fee schedule needs to address the full spectrum of home health services ranging from skilled nursing and therapy services to unskilled personal care or chore services that may be provided by family members. RAND researchers consulted with stakeholders in the California workers' compensation system to outline issues the fee schedule should address, reviewed home health fee schedules used by other payers, and conducted interviews with WC administrators from other jurisdictions to elicit their experiences. California stakeholders identified unskilled attendant services as most problematic in determining need and payment rates, particularly services furnished by family members. RAND researchers concentrated on fee schedule options that would result in a single fee schedule covering the full range of home health care services furnished to injured workers and made three sets of recommendations. The first set pertains to obtaining additional information that would highlight the policy issues likely to occur with the implementation of the fee schedule and alternatives for assessing an injured worker's home health care needs. Another approach conforms most closely with the Labor Code requirements. It would integrate the fee schedules used by Medicare, In-Home Health Supportive Services, and the federal Office of Workers' Compensation. The third approach would base the home health fee schedule on rules used by the federal Office of Workers' Compensation.

  14. EPA Alternative Dispute Resolution Contacts

    Science.gov (United States)

    The success of EPA's ADR efforts depends on a network of talented and experienced professionals in Headquarters offices and EPA Regions. For Agency-wide ADR information, please contact the Conflict Prevention and Resolution Center.

  15. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  16. 75 FR 75448 - Revised Proposal for Revisions to the Schedules of Civil Penalties for a Violation of a Federal...

    Science.gov (United States)

    2010-12-03

    ... the Schedules of Civil Penalties for a Violation of a Federal Railroad Safety Law or Federal Railroad... September 21, 2010. The proposal, if adopted, would amend, line by line, FRA's schedules of civil penalties... . SUPPLEMENTARY INFORMATION: FRA's proposal to amend, line by line, FRA's schedules of civil penalties as well as...

  17. 77 FR 37443 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2012-06-21

    ... an electronic information system used to track review action assignments and customer satisfaction... disposal or reduce the retention period of records already authorized for disposal. NARA invites public... accumulation, agency records managers prepare schedules proposing retention periods for records and submit...

  18. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  19. Shoe allergic contact dermatitis.

    Science.gov (United States)

    Matthys, Erin; Zahir, Amir; Ehrlich, Alison

    2014-01-01

    Foot dermatitis is a widespread condition, affecting men and women of all ages. Because of the location, this condition may present as a debilitating problem to those who have it. Allergic contact dermatitis involving the feet is frequently due to shoes or socks. The allergens that cause shoe dermatitis can be found in any constituent of footwear, including rubber, adhesives, leather, dyes, metals, and medicaments. The goal of treatment is to identify and minimize contact with the offending allergen(s). The lack of product information released from shoe manufacturers and the continually changing trends in footwear present a challenge in treating this condition. The aim of this study is to review the current literature on allergic contact shoe dermatitis; clinical presentation, allergens, patch testing, and management will be discussed. PubMed and MEDLINE databases were used for the search, with a focus on literature updates from the last 15 years.

  20. ENHANCED HYBRID PSO – ACO ALGORITHM FOR GRID SCHEDULING

    Directory of Open Access Journals (Sweden)

    P. Mathiyalagan

    2010-07-01

    Full Text Available Grid computing is a high performance computing environment to solve larger scale computational demands. Grid computing contains resource management, task scheduling, security problems, information management and so on. Task scheduling is a fundamental issue in achieving high performance in grid computing systems. A computational GRID is typically heterogeneous in the sense that it combines clusters of varying sizes, and different clusters typically contains processing elements with different level of performance. In this, heuristic approaches based on particle swarm optimization and ant colony optimization algorithms are adopted for solving task scheduling problems in grid environment. Particle Swarm Optimization (PSO is one of the latest evolutionary optimization techniques by nature. It has the better ability of global searching and has been successfully applied to many areas such as, neural network training etc. Due to the linear decreasing of inertia weight in PSO the convergence rate becomes faster, which leads to the minimal makespan time when used for scheduling. To make the convergence rate faster, the PSO algorithm is improved by modifying the inertia parameter, such that it produces better performance and gives an optimized result. The ACO algorithm is improved by modifying the pheromone updating rule. ACO algorithm is hybridized with PSO algorithm for efficient result and better convergence in PSO algorithm.

  1. Real-time subway information for improving transit ridership.

    Science.gov (United States)

    2016-08-01

    In recent years, the standardization of transit schedule information has yielded a dramatic increase in the accessibility of computerized transit schedules and given rise to real-time service schedules. Two such real-time service schedules are the Ge...

  2. 76 FR 57681 - Modification of Interlibrary Loan Fee Schedule

    Science.gov (United States)

    2011-09-16

    ... through the National Technical Information Service (NTIS) or payment through the Online Computer Library... in order to support the current cost of providing the service and will enable customers to estimate... Service 7 CFR Part 505 RIN 0518-8AA04 Modification of Interlibrary Loan Fee Schedule AGENCY: Agricultural...

  3. ASL or Contact Signing: Issues of Judgment.

    Science.gov (United States)

    Lucas, Ceil; Valli, Clayton

    1991-01-01

    Reports on one aspect of an ongoing study of language contact in the American deaf community. The ultimate goal of the study is a linguistic description of contact signing and a reexamination of claims that it is a pidgin. Patterns of language use are reviewed and the role of demographic information in judgments is examined. (29 references) (GLR)

  4. Implementation of Compressed Work Schedules: Participation and Job Redesign as Critical Factors for Employee Acceptance.

    Science.gov (United States)

    Latack, Janina C.; Foster, Lawrence W.

    1985-01-01

    Analyzes the effects of an implementation of a three-day/thirty-eight hour (3/38) work schedule among information systems personnel (N=84). Data showed that 18 months after implementation, 3/38 employees still strongly favor the compressed schedule. Data also suggest substantial organizational payoffs including reductions in sick time, overtime,…

  5. Medicare program; revisions to payment policies under the physician fee schedule, clinical laboratory fee schedule & other revisions to Part B for CY 2014. Final rule with comment period.

    Science.gov (United States)

    2013-12-10

    This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs. (See the Table of Contents for a listing of the specific issues addressed in the final rule with comment period.)

  6. Scheduling algorithm for data relay satellite optical communication based on artificial intelligent optimization

    Science.gov (United States)

    Zhao, Wei-hu; Zhao, Jing; Zhao, Shang-hong; Li, Yong-jun; Wang, Xiang; Dong, Yi; Dong, Chen

    2013-08-01

    Optical satellite communication with the advantages of broadband, large capacity and low power consuming broke the bottleneck of the traditional microwave satellite communication. The formation of the Space-based Information System with the technology of high performance optical inter-satellite communication and the realization of global seamless coverage and mobile terminal accessing are the necessary trend of the development of optical satellite communication. Considering the resources, missions and restraints of Data Relay Satellite Optical Communication System, a model of optical communication resources scheduling is established and a scheduling algorithm based on artificial intelligent optimization is put forwarded. According to the multi-relay-satellite, multi-user-satellite, multi-optical-antenna and multi-mission with several priority weights, the resources are scheduled reasonable by the operation: "Ascertain Current Mission Scheduling Time" and "Refresh Latter Mission Time-Window". The priority weight is considered as the parameter of the fitness function and the scheduling project is optimized by the Genetic Algorithm. The simulation scenarios including 3 relay satellites with 6 optical antennas, 12 user satellites and 30 missions, the simulation result reveals that the algorithm obtain satisfactory results in both efficiency and performance and resources scheduling model and the optimization algorithm are suitable in multi-relay-satellite, multi-user-satellite, and multi-optical-antenna recourses scheduling problem.

  7. Occupational contact urticaria and protein contact dermatitis.

    Science.gov (United States)

    Doutre, Marie-Sylvie

    2005-01-01

    Irritant dermatitis and eczema are the most prevalent occupational skin diseases. Less common are immediate contact reactions such as contact urticaria and protein contact dermatitis. Occupational contact urticaria can be subdivided into two categories, immunological and non immunological. However, some agents can induce these two types of reactions. Contact urticaria to natural rubber latex is particularly frequent among health care personnel, but contact urticaria to a wide variety of other substances occurs in many other occupations. Among those at risk are cooks, bakers, butchers, restaurant personnel, veterinarians, hairdressers, florists, gardeners, and forestry workers. Protein contact dermatitis in some of these occupations is caused principally by proteins of animal or plant origin, especially among individuals with a history of atopic dermatitis. Diagnosis requires careful interrogation, clinical examination and skin tests (open tests and prick tests with immediate lecture) to identify a particular contact allergen.

  8. Contact Information for EPA's Office of Transportation and Air Quality

    Science.gov (United States)

    You will find an EPA employee by name or by topic of interest, also, you will know who to contact if you want to find a specific transportation and air quality document, importing a vehicle to the US, and other frequently asked questions.

  9. Content Analysis Schedule for Bilingual Education Programs: BICEP Intercambio de la Cultura.

    Science.gov (United States)

    Shore, Marietta Saravia; Nafus, Charles

    This content analysis schedule for BICEP Intercambio de la Cultura (San Bernardino, California), presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  10. An Optimal Scheduling Dispatch of a Microgrid under Risk Assessment

    Directory of Open Access Journals (Sweden)

    Whei-Min Lin

    2018-06-01

    Full Text Available This paper presents the scheduling dispatch of a microgrid (MG, while considering renewable energy, battery storage systems, and time-of-use price. For the risk evaluation of an MG, the Value-at-Risk (VAR is calculated by using the Historical Simulation Method (HSM. By considering the various confidence levels of the VAR, a scheduling dispatch model of the MG is formulated to achieve a reasonable trade-off between the risk and cost. An Improved Bee Swarm Optimization (IBSO is proposed to solve the scheduling dispatch model of the MG. In the IBSO procedure, the Sin-wave Weight Factor (SWF and Forward-Backward Control Factor (FBCF are embedded in the bee swarm of the BSO to improve the movement behaviors of each bee, specifically, its search efficiency and accuracy. The effectiveness of the IBSO is demonstrated via a real MG case and the results are compared with other methods. In either a grid-connected scenario or a stand-alone scenario, an optimal scheduling dispatch of MGs is carried out, herein, at various confidence levels of risk. The simulation results provide more information for handling uncertain environments when analyzing the VAR of MGs.

  11. Washington's marine oil spill compensation schedule - simplified resource damage assessment

    International Nuclear Information System (INIS)

    Geselbracht, L.; Logan, R.

    1993-01-01

    The Washington State Preassessment Screening and Oil Spill Compensation Schedule Rule (Chapter 173-183 Washington Administrative Code), which simplifies natural resource damage assessment for many oil spill cases, became effective in May 1992. The approach described in the rule incorporates a number of preconstructed rankings that rate environmental sensitivity and the propensity of spilled oil to cause environmental harm. The rule also provides guidance regarding how damages calculated under the schedule should be reduced to take into account actions taken by the responsible party that reduce environmental injury. To apply the compensation schedule to marine estuarine spills, the resource trustees need only collect a limited amount of information such as type of product spilled, number of gallons spilled, compensation schedule subregions the spill entered, season of greatest spill impact, percent coverage of habitats affected by the spill, and actions taken by the responsible party. The result of adding a simplified tool to the existing assortment of damage assessment approaches is that resource trustees will now be able to assess damages for most oil spill cases and shift more effort than was possible in the past to resource restoration

  12. Optimal scheduling for distribution network with redox flow battery storage

    International Nuclear Information System (INIS)

    Hosseina, Majid; Bathaee, Seyed Mohammad Taghi

    2016-01-01

    Highlights: • A novel method for optimal scheduling of storages in radial network is presented. • Peak shaving and load leveling are the main objectives. • Vanadium redox flow battery is considered as the energy storage unit. • Real data is used for simulation. - Abstract: There are many advantages to utilize storages in electric power system. Peak shaving, load leveling, load frequency control, integration of renewable, energy trading and spinning reserve are the most important of them. Batteries, especially redox flow batteries, are one of the appropriate storages for utilization in distribution network. This paper presents a novel, heuristic and practical method for optimal scheduling in distribution network with flow battery storage. This heuristic method is more suitable for scheduling and operation of distribution networks which require installation of storages. Peak shaving and load leveling is considered as the main objective in this paper. Several indices are presented in this paper for determine the place of storages and also scheduling for optimal use of energy in them. Simulations of this paper are based on real information of distribution network substation that located in Semnan, Iran.

  13. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  14. 15 CFR 745.1 - Advance notification and annual report of all exports of Schedule 1 chemicals to other States...

    Science.gov (United States)

    2010-01-01

    ... § 745.1 Advance notification and annual report of all exports of Schedule 1 chemicals to other States... Prohibition of Chemical Weapons (OPCW) not less than 30 days in advance of every export of a Schedule 1...: “Advance Notification of Schedule 1 Chemical Export”. (3) Upon receipt of the notification, BIS will inform...

  15. 32 CFR 169a.8 - Inventory and review schedule (Report Control Symbol DD-P&L(A)).

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Inventory and review schedule (Report Control... OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.8 Inventory and review schedule (Report Control Symbol DD-P&L(A)). (a) Information in each DoD Component's...

  16. Analyzing scheduling in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2009-01-01

    Production scheduling has been widely studied in several research areas, resulting in a large number of methods, prescriptions, and approaches. However, the impact on scheduling practice seems relatively low. This is also the case in the food-processing industry, where industry......-specific characteristics induce specific and complex scheduling problems. Based on ideas about decomposition of the scheduling task and the production process, we develop an analysis methodology for scheduling problems in food processing. This combines an analysis of structural (technological) elements of the production...... process with an analysis of the tasks of the scheduler. This helps to understand, describe, and structure scheduling problems in food processing, and forms a basis for improving scheduling and applying methods developed in literature. It also helps in evaluating the organisational structures...

  17. Proportional fair scheduling algorithm based on traffic in satellite communication system

    Science.gov (United States)

    Pan, Cheng-Sheng; Sui, Shi-Long; Liu, Chun-ling; Shi, Yu-Xin

    2018-02-01

    In the satellite communication network system, in order to solve the problem of low system capacity and user fairness in multi-user access to satellite communication network in the downlink, combined with the characteristics of user data service, an algorithm study on throughput capacity and user fairness scheduling is proposed - Proportional Fairness Algorithm Based on Traffic(B-PF). The algorithm is improved on the basis of the proportional fairness algorithm in the wireless communication system, taking into account the user channel condition and caching traffic information. The user outgoing traffic is considered as the adjustment factor of the scheduling priority and presents the concept of traffic satisfaction. Firstly,the algorithm calculates the priority of the user according to the scheduling algorithm and dispatches the users with the highest priority. Secondly, when a scheduled user is the business satisfied user, the system dispatches the next priority user. The simulation results show that compared with the PF algorithm, B-PF can improve the system throughput, the business satisfaction and fairness.

  18. Online respondent-driven sampling for studying contact patterns relevant for the spread of close-contact pathogens : A pilot study in Thailand

    NARCIS (Netherlands)

    Stein, Mart L.; van Steenbergen, Jim E.; Chanyasanha, Charnchudhi; Tipayamongkholgul, Mathuros; Buskens, Vincent; van der Heijden, Peter G. M.; Sabaiwan, Wasamon; Bengtsson, Linus; Lu, Xin; Thorson, Anna E.; Kretzschmar, Mirjam E. E.

    2014-01-01

    Background: Information on social interactions is needed to understand the spread of airborne infections through a population. Previous studies mostly collected egocentric information of independent respondents with self-reported information about contacts. Respondent-driven sampling (RDS) is a

  19. Resource-constrained project scheduling problem: review of past and recent developments

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-01-01

    Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.

  20. Contact detection for nanomanipulation in a scanning electron microscope

    Energy Technology Data Exchange (ETDEWEB)

    Ru, Changhai, E-mail: rchhai@gmail.com [Automation College, Harbin Engineering University, Harbin 150001 (China); Robotics and Microsystems Center, Soochow University, Jiangsu 215021 (China); To, Steve, E-mail: Steve.to@utoronto.ca [Department of Mechanical and Industry Engineering, University of Toronto, Ontario, Canada M5S3G8 (Canada)

    2012-07-15

    Nanomanipulation systems require accurate knowledge of the end-effector position in all three spatial coordinates, XYZ, for reliable manipulation of nanostructures. Although the images acquired by a scanning electron microscope (SEM) provide high resolution XY information, the lack of depth information in the Z-direction makes 3D nanomanipulation time-consuming. Existing approaches for contact detection of end-effectors inside SEM typically utilize fragile touch sensors that are difficult to integrate into a nanomanipulation system. This paper presents a method for determining the contact between an end-effector and a target surface during nanomanipulation inside SEM, purely based on the processing of SEM images. A depth-from-focus method is used in the fast approach of the end-effector to the substrate, followed by fine contact detection. Experimental results demonstrate that the contact detection approach is capable of achieving an accuracy of 21.5 nm at 50,000 Multiplication-Sign magnification while inducing little end-effector damage. -- Highlights: Black-Right-Pointing-Pointer We presents a simple method for obtaining the depth information in SEM-based nanomanipulation. Black-Right-Pointing-Pointer Detecting contact between an end-effector and a target surface using SEM as a vision sensor. Black-Right-Pointing-Pointer Additional touch/force sensors or specialized hardware need not be added. Black-Right-Pointing-Pointer Achieved high repeatability and accuracy. Black-Right-Pointing-Pointer Complete automatic contact detection within typically 60 s.

  1. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  2. Web-Based Requesting and Scheduling Use of Facilities

    Science.gov (United States)

    Yeager, Carolyn M.

    2010-01-01

    Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.

  3. Wound-Related Allergic/Irritant Contact Dermatitis.

    Science.gov (United States)

    Alavi, Afsaneh; Sibbald, R Gary; Ladizinski, Barry; Saraiya, Ami; Lee, Kachiu C; Skotnicki-Grant, Sandy; Maibach, Howard

    2016-06-01

    To provide information from a literature review about the prevention, recognition, and treatment for contact dermatitis. This continuing education activity is intended for physicians and nurses with an interest in skin and wound care. After participating in this educational activity, the participant should be better able to:1. Identify signs and symptoms of and diagnostic measures for contact dermatitis.2. Identify causes and risks for contact dermatitis.3. Select appropriate treatment for contact dermatitis and its prevention. Contact dermatitis to wound care products is a common, often neglected problem. A review was conducted to identify articles relevant to contact dermatitis.A PubMed English-language literature review was conducted for appropriate articles published between January 2000 and December 2015.Contact dermatitis is both irritant (80% of cases) or allergic (20% of cases). Frequent use of potential contact allergens and impaired barrier function of the skin can lead to rising sensitization in patients with chronic wounds. Common known allergens to avoid in wound care patients include fragrances, colophony, lanolin, and topical antibiotics.Clinicians should be cognizant of the allergens in wound care products and the potential for sensitization. All medical devices, including wound dressings, adhesives, and bandages, should be labeled with their complete ingredients, and manufacturers should be encouraged to remove common allergens from wound care products, including topical creams, ointments, and dressings.

  4. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  5. Amino acid empirical contact energy definitions for fold recognition in the space of contact maps

    Directory of Open Access Journals (Sweden)

    Fogolari Federico

    2003-02-01

    Full Text Available Abstract Background Contradicting evidence has been presented in the literature concerning the effectiveness of empirical contact energies for fold recognition. Empirical contact energies are calculated on the basis of information available from selected protein structures, with respect to a defined reference state, according to the quasi-chemical approximation. Protein-solvent interactions are estimated from residue solvent accessibility. Results In the approach presented here, contact energies are derived from the potential of mean force theory, several definitions of contact are examined and their performance in fold recognition is evaluated on sets of decoy structures. The best definition of contact is tested, on a more realistic scenario, on all predictions including sidechains accepted in the CASP4 experiment. In 30 out of 35 cases the native structure is correctly recognized and best predictions are usually found among the 10 lowest energy predictions. Conclusion The definition of contact based on van der Waals radii of alpha carbon and side chain heavy atoms is seen to perform better than other definitions involving only alpha carbons, only beta carbons, all heavy atoms or only backbone atoms. An important prerequisite for the applicability of the approach is that the protein structure under study should not exhibit anomalous solvent accessibility, compared to soluble proteins whose structure is deposited in the Protein Data Bank. The combined evaluation of a solvent accessibility parameter and contact energy allows for an effective gross screening of predictive models.

  6. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  7. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  8. Multi-Channel Scheduling for Fast Convergecast in Wireless Sensor Networks

    NARCIS (Netherlands)

    Durmaz, O.; Ghosh, A.; Krishnamachari, B.; Chintalapudi, K.

    We explore the following fundamental question - how fast can information be collected from a wireless sensor network? We consider a number of design parameters such as, power control, time and frequency scheduling, and routing. There are essentially two factors that hinder efficient data collection

  9. Modeling the Emergence of Contact Languages

    Science.gov (United States)

    Tria, Francesca; Servedio, Vito D.P.; Mufwene, Salikoko S.; Loreto, Vittorio

    2015-01-01

    Contact languages are born out of the non-trivial interaction of two (or more) parent languages. Nowadays, the enhanced possibility of mobility and communication allows for a strong mixing of languages and cultures, thus raising the issue of whether there are any pure languages or cultures that are unaffected by contact with others. As with bacteria or viruses in biological evolution, the evolution of languages is marked by horizontal transmission; but to date no reliable quantitative tools to investigate these phenomena have been available. An interesting and well documented example of contact language is the emergence of creole languages, which originated in the contacts of European colonists and slaves during the 17th and 18th centuries in exogenous plantation colonies of especially the Atlantic and Indian Ocean. Here, we focus on the emergence of creole languages to demonstrate a dynamical process that mimics the process of creole formation in American and Caribbean plantation ecologies. Inspired by the Naming Game (NG), our modeling scheme incorporates demographic information about the colonial population in the framework of a non-trivial interaction network including three populations: Europeans, Mulattos/Creoles, and Bozal slaves. We show how this sole information makes it possible to discriminate territories that produced modern creoles from those that did not, with a surprising accuracy. The generality of our approach provides valuable insights for further studies on the emergence of languages in contact ecologies as well as to test specific hypotheses about the peopling and the population structures of the relevant territories. We submit that these tools could be relevant to addressing problems related to contact phenomena in many cultural domains: e.g., emergence of dialects, language competition and hybridization, globalization phenomena. PMID:25875371

  10. 75 FR 45673 - Compliance Assistance Resources and Points of Contact Available to Small Businesses

    Science.gov (United States)

    2010-08-03

    .../business-law/contacts/federal/ FOR FURTHER INFORMATION CONTACT: Wendy Liberante, Office of Information and... businesses. This list is available today on the following Web site: http://www.business.gov/business-law....business.gov/business-law/contacts/federal/ . OMB and SBA have chosen to implement this statutory...

  11. Household HIV Testing Uptake among Contacts of TB Patients in South Africa.

    Directory of Open Access Journals (Sweden)

    Kavindhran Velen

    Full Text Available In high HIV prevalence settings, offering HIV testing may be a reasonable part of contact tracing of index tuberculosis (TB patients. We evaluated the uptake of HIV counselling and testing (HCT among household contacts of index TB patients and the proportion of newly diagnosed HIV-infected persons linked into care as part of a household TB contact tracing study.We recruited index TB patients at public health clinics in two South African provinces to obtain consent for household contact tracing. During scheduled household visits we offered TB symptom screening to all household members and HCT to individuals ≥14years of age. Factors associated with HCT uptake were investigated using a random effects logistic regression model.Out of 1,887 listed household members ≥14 years old, 984 (52% were available during a household visit and offered HCT of which 108 (11% self-reported being HIV infected and did not undergo HCT. Of the remaining 876, a total of 304 agreed to HCT (35%; 26 (8.6% were newly diagnosed as HIV positive. In multivariable analysis, factors associated with uptake of HCT were prior testing (odds ratio 1.6; 95% confidence interval [CI]: 1.1-2.3 and another member in the household testing (odds ratio 2.4; 95% CI: 1.7-3.4. Within 3 months of testing HIV-positive, 35% reported initiating HIV care.HCT as a component of household TB contact tracing reached individuals without prior HIV testing, however uptake of HIV testing was poor. Strategies to improve HIV testing in household contacts should be evaluated.

  12. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  13. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  14. Contact and contagion: Probability of transmission given contact varies with demographic state in bighorn sheep.

    Science.gov (United States)

    Manlove, Kezia R; Cassirer, E Frances; Plowright, Raina K; Cross, Paul C; Hudson, Peter J

    2017-07-01

    Understanding both contact and probability of transmission given contact are key to managing wildlife disease. However, wildlife disease research tends to focus on contact heterogeneity, in part because the probability of transmission given contact is notoriously difficult to measure. Here, we present a first step towards empirically investigating the probability of transmission given contact in free-ranging wildlife. We used measured contact networks to test whether bighorn sheep demographic states vary systematically in infectiousness or susceptibility to Mycoplasma ovipneumoniae, an agent responsible for bighorn sheep pneumonia. We built covariates using contact network metrics, demographic information and infection status, and used logistic regression to relate those covariates to lamb survival. The covariate set contained degree, a classic network metric describing node centrality, but also included covariates breaking the network metrics into subsets that differentiated between contacts with yearlings, ewes with lambs, and ewes without lambs, and animals with and without active infections. Yearlings, ewes with lambs, and ewes without lambs showed similar group membership patterns, but direct interactions involving touch occurred at a rate two orders of magnitude higher between lambs and reproductive ewes than between any classes of adults or yearlings, and one order of magnitude higher than direct interactions between multiple lambs. Although yearlings and non-reproductive bighorn ewes regularly carried M. ovipneumoniae, our models suggest that a contact with an infected reproductive ewe had approximately five times the odds of producing a lamb mortality event of an identical contact with an infected dry ewe or yearling. Consequently, management actions targeting infected animals might lead to unnecessary removal of young animals that carry pathogens but rarely transmit. This analysis demonstrates a simple logistic regression approach for testing a priori

  15. Long range planning, scheduling and budgeting for the environmental compliance program at the Rocky Flats Plant

    International Nuclear Information System (INIS)

    McKinley, K.B.; Nielsen, T.H.

    1989-01-01

    This paper reports how the Rocky Flats RCRA/CERCLA group at the Rocky Flats Plant in Golden, Colorado is developing a computerized schedule and budget management system. The system will aggregate schedule, budgets, and regulatory commitments provided by RCRA/CERCLA program managers. The system will provide tabular and graphical representations of the schedule and budget information at various levels of detail. The system will perform a variety of analyses on the schedule and budget. The RCRA/CERCLA group will use the results to develop realistic compliance schedules and the budgets necessary to meet them. Presentation of the schedules and budgets in a consistent graphical and tabular form will give a good appreciation of the remediation costs as understood by the RCRA/CERCLA group. The system will then be used to test resource availability and remediation period scenarios, differing from the optimal combination as determined by the RCRA/CERCLA group

  16. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  17. Cultural-Based Genetic Tabu Algorithm for Multiobjective Job Shop Scheduling

    Directory of Open Access Journals (Sweden)

    Yuzhen Yang

    2014-01-01

    Full Text Available The job shop scheduling problem, which has been dealt with by various traditional optimization methods over the decades, has proved to be an NP-hard problem and difficult in solving, especially in the multiobjective field. In this paper, we have proposed a novel quadspace cultural genetic tabu algorithm (QSCGTA to solve such problem. This algorithm provides a different structure from the original cultural algorithm in containing double brief spaces and population spaces. These spaces deal with different levels of populations globally and locally by applying genetic and tabu searches separately and exchange information regularly to make the process more effective towards promising areas, along with modified multiobjective domination and transform functions. Moreover, we have presented a bidirectional shifting for the decoding process of job shop scheduling. The computational results we presented significantly prove the effectiveness and efficiency of the cultural-based genetic tabu algorithm for the multiobjective job shop scheduling problem.

  18. Parental nonstandard work schedules during infancy and children's BMI trajectories

    Directory of Open Access Journals (Sweden)

    Afshin Zilanawala

    2017-09-01

    Full Text Available Background: Empirical evidence has demonstrated adverse associations between parental nonstandard work schedules (i.e., evenings, nights, or weekends and child developmental outcomes. However, there are mixed findings concerning the relationship between parental nonstandard employment and children's body mass index (BMI, and few studies have incorporated information on paternal work schedules. Objective: This paper investigated BMI trajectories from early to middle childhood (ages 3-11 by parental work schedules at 9 months of age, using nationally representative cohort data from the United Kingdom. This study is the first to examine the link between nonstandard work schedules and children's BMI in the United Kingdom. Methods: We used data from the Millennium Cohort Study (2001‒2013, n = 13,021 to estimate trajectories in BMI, using data from ages 3, 5, 7, and 11 years. Joint parental work schedules and a range of biological, socioeconomic, and psychosocial covariates were assessed in the initial interviews at 9 months. Results: Compared to children in two-parent families where parents worked standard shifts, we found steeper BMI growth trajectories for children in two-parent families where both parents worked nonstandard shifts and children in single-parent families whose mothers worked a standard shift. Fathers' shift work, compared to standard shifts, was independently associated with significant increases in BMI. Conclusions: Future public health initiatives focused on reducing the risk of rapid BMI gain in childhood can potentially consider the disruptions to family processes resulting from working nonstandard hours. Contribution: Children in families in which both parents work nonstandard schedules had steeper BMI growth trajectories across the first decade of life. Fathers' nonstandard shifts were independently associated with increases in BMI.

  19. Simulation of textile manufacturing processes for planning, scheduling, and quality control purposes

    Science.gov (United States)

    Cropper, A. E.; Wang, Z.

    1995-08-01

    Simulation, as a management information tool, has been applied to engineering manufacture and assembly operations. The application of the principles to textile manufacturing (fiber to fabric) is discussed. The particular problems and solutions in applying the simulation software package to the yarn production processes are discussed with an indication of how the software achieves the production schedule. The system appears to have application in planning, scheduling, and quality assurance. The latter being a result of the traceability possibilities through a process involving mixing and splitting of material.

  20. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  1. Clustering of contacts relevant to the spread of infectious disease.

    Science.gov (United States)

    Xiao, Xiong; van Hoek, Albert Jan; Kenward, Michael G; Melegaro, Alessia; Jit, Mark

    2016-12-01

    Infectious disease spread depends on contact rates between infectious and susceptible individuals. Transmission models are commonly informed using empirically collected contact data, but the relevance of different contact types to transmission is still not well understood. Some studies select contacts based on a single characteristic such as proximity (physical/non-physical), location, duration or frequency. This study aimed to explore whether clusters of contacts similar to each other across multiple characteristics could better explain disease transmission. Individual contact data from the POLYMOD survey in Poland, Great Britain, Belgium, Finland and Italy were grouped into clusters by the k medoids clustering algorithm with a Manhattan distance metric to stratify contacts using all four characteristics. Contact clusters were then used to fit a transmission model to sero-epidemiological data for varicella-zoster virus (VZV) in each country. Across the five countries, 9-15 clusters were found to optimise both quality of clustering (measured using average silhouette width) and quality of fit (measured using several information criteria). Of these, 2-3 clusters were most relevant to VZV transmission, characterised by (i) 1-2 clusters of age-assortative contacts in schools, (ii) a cluster of less age-assortative contacts in non-school settings. Quality of fit was similar to using contacts stratified by a single characteristic, providing validation that single stratifications are appropriate. However, using clustering to stratify contacts using multiple characteristics provided insight into the structures underlying infection transmission, particularly the role of age-assortative contacts, involving school age children, for VZV transmission between households. Copyright © 2016 The Author(s). Published by Elsevier B.V. All rights reserved.

  2. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  3. 77 FR 35355 - User Fee Schedule for Trade Promotion Services

    Science.gov (United States)

    2012-06-13

    ...-XA17 User Fee Schedule for Trade Promotion Services AGENCY: U.S. & Foreign Commercial Service... promotion services under the current fee structure. ITA provides a wide range of trade promotion information... these more intensive trade promotion services. The fee revenue is expected to continue to contribute to...

  4. Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach

    DEFF Research Database (Denmark)

    Hansen, Anders Dohn; Clausen, Jens

    This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning...

  5. Contact symmetries and Hamiltonian thermodynamics

    International Nuclear Information System (INIS)

    Bravetti, A.; Lopez-Monsalvo, C.S.; Nettel, F.

    2015-01-01

    It has been shown that contact geometry is the proper framework underlying classical thermodynamics and that thermodynamic fluctuations are captured by an additional metric structure related to Fisher’s Information Matrix. In this work we analyse several unaddressed aspects about the application of contact and metric geometry to thermodynamics. We consider here the Thermodynamic Phase Space and start by investigating the role of gauge transformations and Legendre symmetries for metric contact manifolds and their significance in thermodynamics. Then we present a novel mathematical characterization of first order phase transitions as equilibrium processes on the Thermodynamic Phase Space for which the Legendre symmetry is broken. Moreover, we use contact Hamiltonian dynamics to represent thermodynamic processes in a way that resembles the classical Hamiltonian formulation of conservative mechanics and we show that the relevant Hamiltonian coincides with the irreversible entropy production along thermodynamic processes. Therefore, we use such property to give a geometric definition of thermodynamically admissible fluctuations according to the Second Law of thermodynamics. Finally, we show that the length of a curve describing a thermodynamic process measures its entropy production

  6. Contact engineering for nano-scale CMOS

    KAUST Repository

    Hussain, Muhammad Mustafa

    2012-09-10

    High performance computation with longer battery lifetime is an essential component in our today\\'s digital electronics oriented life. To achieve these goals, field effect transistors based complementary metal oxide semiconductor play the key role. One of the critical requirements of transistor structure and fabrication is efficient contact engineering. To catch up with high performance information processing, transistors are going through continuous scaling process. However, it also imposes new challenges to integrate good contact materials in a small area. This can be counterproductive as smaller area results in higher contact resistance thus reduced performance for the transistor itself. At the same time, discovery of new one or two-dimensional materials like nanowire, nanotube, or atomic crystal structure materials, introduces new set of challenges and opportunities. In this paper, we are reviewing them in a synchronized fashion: fundamentals of contact engineering, evolution into non-planar field effect transistors, opportunities and challenges with one and two-dimensional materials and a new opportunity of contact engineering from device architecture perspective. © 2012 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  7. In Vivo Measurement of Glenohumeral Joint Contact Patterns

    Directory of Open Access Journals (Sweden)

    Bey MichaelJ

    2010-01-01

    Full Text Available The objectives of this study were to describe a technique for measuring in-vivo glenohumeral joint contact patterns during dynamic activities and to demonstrate application of this technique. The experimental technique calculated joint contact patterns by combining CT-based 3D bone models with joint motion data that were accurately measured from biplane x-ray images. Joint contact patterns were calculated for the repaired and contralateral shoulders of 20 patients who had undergone rotator cuff repair. Significant differences in joint contact patterns were detected due to abduction angle and shoulder condition (i.e., repaired versus contralateral. Abduction angle had a significant effect on the superior/inferior contact center position, with the average joint contact center of the repaired shoulder 12.1% higher on the glenoid than the contralateral shoulder. This technique provides clinically relevant information by calculating in-vivo joint contact patterns during dynamic conditions and overcomes many limitations associated with conventional techniques for quantifying joint mechanics.

  8. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  9. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  10. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    Science.gov (United States)

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  11. Optimal joint scheduling of electrical and thermal appliances in a smart home environment

    International Nuclear Information System (INIS)

    Shirazi, Elham; Zakariazadeh, Alireza; Jadid, Shahram

    2015-01-01

    Highlights: • Thermal appliances are scheduled based on desired temperature and energy prices. • A discomfort index has been introduced within the home energy scheduling model. • Appliances are scheduled based on activity probability and desired options. • Starting probability depends on the social random factor and consumption behavior. - Abstract: With the development of home area network, residents have the opportunity to schedule their power usage in the home by themselves aiming at reducing electricity expenses. Moreover, as renewable energy sources are deployed in home, a home energy management system needs to consider both energy consumption and generation simultaneously to minimize the energy cost. In this paper, a smart home energy management model has been presented in which electrical and thermal appliances are jointly scheduled. The proposed method aims at minimizing the electricity cost of a residential customer by scheduling various type of appliances considering the residents consumption behavior, seasonal probability, social random factor, discomfort index and appliances starting probability functions. In this model, the home central controller receives the electricity price information, environmental factors data as well as the resident desired options in order to optimally schedule appliances including electrical and thermal. The scheduling approach is tested on a typical home including variety of home appliances, a small wind turbine, photovoltaic panel, combined heat and power unit, boiler and electrical and thermal storages over a 24-h period. The results show that the scheduling of different appliances can be reached simultaneously by using the proposed formulation. Moreover, simulation results evidenced that the proposed home energy management model exhibits a lower cost and, therefore, is more economical.

  12. Molecular dynamics study of contact mechanics: contact area and interfacial separation from small to full contact

    OpenAIRE

    Yang, C.; Persson, B. N. J.

    2007-01-01

    We report a molecular dynamics study of the contact between a rigid solid with a randomly rough surface and an elastic block with a flat surface. We study the contact area and the interfacial separation from small contact (low load) to full contact (high load). For small load the contact area varies linearly with the load and the interfacial separation depends logarithmically on the load. For high load the contact area approaches to the nominal contact area (i.e., complete contact), and the i...

  13. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  14. The role of the production scheduling system in rescheduling

    Science.gov (United States)

    Kalinowski, K.; Grabowik, C.; Kempa, W.; Paprocka, I.

    2015-11-01

    The paper presents the rescheduling problem in the context of cooperation between production scheduling system (PSS) and other units in an integrated manufacturing environment - decision makers and software systems. The main aim is to discuss the PSS functionality for maximizing automation of the rescheduling process, reducing the response time and improving the quality of generated solutions. PSSs operate in the meeting of tactical and operational level of planning and control, and play an important role in the production preparation and control. On the basis of information about orders, technology and production system state (e.g. resources availability) they prepare and/or update a detailed plan of production flow - a schedule. All necessary data for scheduling and rescheduling are usually collected in other systems both from organizational and technical production preparation, e.g. ERP, PLM, MES, CAPP or others, as well as they are entered directly by the decision- makers/operators. Data acquired in this way are often incomplete and inconsistent. Therefore the existing rescheduling software works according to interactive method - rather support but does not replace the human decision maker in tasks planning. When rescheduling, due to the limited amount of time to make a decision this interaction is particularly important. An additional problem arises in data acquisition, in the process of data exchanging between systems or in the identification of new data sources and their processing. Different approaches to rescheduling were characterized, including those solutions, where all these operations are carried out by an autonomous system and those in which scheduling is performed only upon request from the outside, for the newly created scheduling data representing the current state of the production system.

  15. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  16. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  17. Compliance among soft contact lens wearers.

    Science.gov (United States)

    Kuzman, Tomislav; Kutija, Marija Barisić; Masnec, Sanja; Jandroković, Sonja; Mrazovac, Danijela; Jurisić, Darija; Skegro, Ivan; Kalauz, Miro; Kordić, Rajko

    2014-12-01

    Contact lens compliance is proven to be crucial for preventing lens wear-related complications because of the interdependence of the steps in lens care regime and their influence on lens system microbial contamination. Awareness of the patients' lens handling compliance as well as correct recognition of non-compliant behaviours is the basis for creating more targeted strategies for patient education. The aim of this study was to investigate compliance among soft contact lens (SCL) wearers in different aspects of lens care handling and wearing habits. In our research 50 asymptomatic lens wearers filled out a questionnaire containing demographic data, lens type, hygiene and wearing habits, lenses and lens care system replacement schedule and self-evaluation of contact lens handling hygiene. We established criteria of compliance according to available manufacturer's recommendations, prior literature and our clinical experience. Only 2 (4%) of patients were fully compliant SCL wearers. The most common non-compliant behaviours were insufficient lens solution soaking time (62%), followed by failure to daily exchange lens case solution and showering while wearing lenses. 44% of patients reported storing lenses in saline solution. Mean lens storage case replacement was 3.6 months, with up to 78% patients replacing lens case at least once in 3 months. Average grade in self evaluating level of compliance was very good (4 +/- 0.78) (from 1-poor level of hygiene to 5-great level of hygiene). Lens wearers who reported excessive daily lens wear and more than 10 years of lens wearing experience were also found to be less compliant with other lens system care procedures. (t = -2.99, df=47, p rate, self grading was relatively high. Therefore, these results indicate the need for patient education and encouragement of better lens wearing habits and all of the lens maintenance steps at each patient visit.

  18. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  19. Performance improvement of per-user threshold based multiuser switched scheduling system

    KAUST Repository

    Nam, Haewoon

    2013-01-01

    SUMMARY This letter proposes a multiuser switched scheduling scheme with per-user threshold and post user selection and provides a generic analytical framework for determining the optimal feedback thresholds. The proposed scheme applies an individual feedback threshold for each user rather than a single common threshold for all users to achieve some capacity gain due to the flexibility of threshold selection as well as a lower scheduling outage probability. In addition, since scheduling outage may occur with a non-negligible probability, the proposed scheme employs post user selection in order to further improve the ergodic capacity, where the user with the highest potential for a higher channel quality than other users is selected. Numerical and simulation results show that the capacity gain by post user selection is significant when random sequence is used. Copyright © 2013 The Institute of Electronics, Information and Communication Engineers.

  20. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  1. [Epidemiologic surveillance of contact allergens. The "monitoring series" of IVDK (Information Network ofDermatologic Clinics for Detection and Scientific Evaluation of Contact Allergy].

    Science.gov (United States)

    Aberer, W; Komericki, P; Uter, W; Hausen, B M; Lessmann, H; Kränke, B; Geier, J; Schnuch, A

    2003-08-01

    The selection of the most important contact allergens is subject to a continuous change. Several factors may influence the sensitization rates and thus the decision, which substances to include in the standard series of the most frequent allergens. The Information Network of Departments of Dermatology adds substances of interest for a certain time period to the standard series in order to evaluate parameters such as sensitization rate, grade of reaction, and clinical relevance of positive reactions. In 6 testing periods starting in 1996, 13 test substances were evaluated. Due to the results, propolis, compositae mix, and bufexamac were included in the standard series in 1999, while lyral was added in 2002. Sorbitansesquioleat, dispers blue mix, and iodopropynyl butylcarbamate are under further discussion. Substances such as glutaraldehyde and p-aminoazobenzole should be tested in certain risk groups only, whereas the steroids budesonide and tixocortol should be tested when clinically suspected.

  2. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  3. Contact angle and local wetting at contact line.

    Science.gov (United States)

    Li, Ri; Shan, Yanguang

    2012-11-06

    This theoretical study was motivated by recent experiments and theoretical work that had suggested the dependence of the static contact angle on the local wetting at the triple-phase contact line. We revisit this topic because the static contact angle as a local wetting parameter is still not widely understood and clearly known. To further clarify the relationship of the static contact angle with wetting, two approaches are applied to derive a general equation for the static contact angle of a droplet on a composite surface composed of heterogeneous components. A global approach based on the free surface energy of a thermodynamic system containing the droplet and solid surface shows the static contact angle as a function of local surface chemistry and local wetting state at the contact line. A local approach, in which only local forces acting on the contact line are considered, results in the same equation. The fact that the local approach agrees with the global approach further demonstrates the static contact angle as a local wetting parameter. Additionally, the study also suggests that the wetting described by the Wenzel and Cassie equations is also the local wetting of the contact line rather than the global wetting of the droplet.

  4. [Sport injuries in full contact and semi-contact karate].

    Science.gov (United States)

    Greier, K; Riechelmann, H; Ziemska, J

    2014-03-01

    Karate enjoys great popularity both in professional and recreational sports and can be classified into full, half and low contact styles. The aim of this study was the analysis of sports injuries in Kyokushinkai (full contact) and traditional Karate (semi-contact). In a retrospective study design, 215 active amateur karateka (114 full contact, 101 semi-contact) were interviewed by means of a standardised questionnaire regarding typical sport injuries during the last 36 months. Injuries were categorised into severity grade I (not requiring medical treatment), grade II (single medical treatment), grade III (several outpatient medical treatments) and grade IV (requiring hospitalisation). In total, 217 injuries were reported in detail. 125 injuries (58%) occurred in full contact and 92 (42%) in semi-contact karate. The time related injury rate of full contact karateka was 1.9/1000 h compared to 1.3/1000 h of semi-contact karateka (p injuries were musculoskeletal contusions (33% full contact, 20% semi-contact), followed by articular sprains with 19% and 16%. The lower extremity was affected twice as often in full contact (40%) as in semi-contact (20%) karate. Training injuries were reported by 80% of the full contact and 77% of the semi-contact karateka. Most injuries, both in training and competition, occurred in kumite. 75% of the reported injuries of full contact and 70% of semi-contact karateka were classified as low grade (I or II). The high rate of injuries during training and kumite (sparring) points to specific prevention goals. The emphasis should be put on proprioceptive training and consistent warm-up. In the actual competition the referees play a vital role regarding prevention. © Georg Thieme Verlag KG Stuttgart · New York.

  5. Information logistics: A production-line approach to information services

    Science.gov (United States)

    Adams, Dennis; Lee, Chee-Seng

    1991-01-01

    Logistics can be defined as the process of strategically managing the acquisition, movement, and storage of materials, parts, and finished inventory (and the related information flow) through the organization and its marketing channels in a cost effective manner. It is concerned with delivering the right product to the right customer in the right place at the right time. The logistics function is composed of inventory management, facilities management, communications unitization, transportation, materials management, and production scheduling. The relationship between logistics and information systems is clear. Systems such as Electronic Data Interchange (EDI), Point of Sale (POS) systems, and Just in Time (JIT) inventory management systems are important elements in the management of product development and delivery. With improved access to market demand figures, logisticians can decrease inventory sizes and better service customer demand. However, without accurate, timely information, little, if any, of this would be feasible in today's global markets. Information systems specialists can learn from logisticians. In a manner similar to logistics management, information logistics is concerned with the delivery of the right data, to the ring customer, at the right time. As such, information systems are integral components of the information logistics system charged with providing customers with accurate, timely, cost-effective, and useful information. Information logistics is a management style and is composed of elements similar to those associated with the traditional logistics activity: inventory management (data resource management), facilities management (distributed, centralized and decentralized information systems), communications (participative design and joint application development methodologies), unitization (input/output system design, i.e., packaging or formatting of the information), transportations (voice, data, image, and video communication systems

  6. Contact engineering for nano-scale CMOS

    KAUST Repository

    Hussain, Muhammad Mustafa; Fahad, Hossain M.; Qaisi, Ramy M.

    2012-01-01

    . One of the critical requirements of transistor structure and fabrication is efficient contact engineering. To catch up with high performance information processing, transistors are going through continuous scaling process. However, it also imposes new

  7. Escalonamento cooperativo interorganizacional Cooperative inter-organizational scheduling

    Directory of Open Access Journals (Sweden)

    Ricardo J. Rabelo

    2000-12-01

    Full Text Available Este trabalho tem como objetivo essencial apresentar uma abordagem para uma ágil coordenação e supervisão das ordens de produção da empresa, dando uma nova dimensão à atividade de "escalonamento" (scheduling, não apenas numa perspectiva intra-organizacional, mas também interorganizacional, contemplando toda a cadeia produtiva. Apresenta os fundamentos de um protótipo sendo desenvolvido, baseado nos paradigmas de negociação multiagente e de sistemas de suporte à decisão. Aspectos relacionados com a modelagem e integração da informação requerida nos vários níveis do CIM são abordados. Ao final, uma série de considerações são feitas, quer em relação aos resultados atingidos com o protótipo atual, quer para com as várias dificuldades - e desafios - existentes para a realização de um escalonamento cooperativo interorganizacional.This work aims at presenting an approach for agile scheduling coordination and supervision of distributed production orders, giving rise to a new dimension of the scheduling activity, not only under the intra-organizational perspective, but also the inter-organizational, comprising the whole productive chain. It generally presents a prototype being developed, based on the paradigms of multi-agent negotiation and decision support systems. Aspects related with the information modeling and integration in the several levels of CIM are tackled. At the end, a series of considerations is made, pointing out the results reached with the current prototype, and the several difficulties - and challenges - existent for the accomplishment of cooperative inter-organizational scheduling.

  8. Contact detection for nanomanipulation in a scanning electron microscope.

    Science.gov (United States)

    Ru, Changhai; To, Steve

    2012-07-01

    Nanomanipulation systems require accurate knowledge of the end-effector position in all three spatial coordinates, XYZ, for reliable manipulation of nanostructures. Although the images acquired by a scanning electron microscope (SEM) provide high resolution XY information, the lack of depth information in the Z-direction makes 3D nanomanipulation time-consuming. Existing approaches for contact detection of end-effectors inside SEM typically utilize fragile touch sensors that are difficult to integrate into a nanomanipulation system. This paper presents a method for determining the contact between an end-effector and a target surface during nanomanipulation inside SEM, purely based on the processing of SEM images. A depth-from-focus method is used in the fast approach of the end-effector to the substrate, followed by fine contact detection. Experimental results demonstrate that the contact detection approach is capable of achieving an accuracy of 21.5 nm at 50,000× magnification while inducing little end-effector damage. Copyright © 2012 Elsevier B.V. All rights reserved.

  9. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  10. Application of 3D model in the schedule management of nuclear power plant construction

    International Nuclear Information System (INIS)

    Nian Fayang

    2009-01-01

    While 3D technology has been widely used in engineering design, the 3D model of engineering design also includes information that can be used to construction. By the visual interface, the 3D model can be used in different aspects of construction. By linking the 3D model with the construction schedule, the 4D model can be created, through which the visual manage of the construction schedule can be achieved. (authors)

  11. Data analysis with the DIANA meta-scheduling approach

    International Nuclear Information System (INIS)

    Anjum, A; McClatchey, R; Willers, I

    2008-01-01

    The concepts, design and evaluation of the Data Intensive and Network Aware (DIANA) meta-scheduling approach for solving the challenges of data analysis being faced by CERN experiments are discussed in this paper. Our results suggest that data analysis can be made robust by employing fault tolerant and decentralized meta-scheduling algorithms supported in our DIANA meta-scheduler. The DIANA meta-scheduler supports data intensive bulk scheduling, is network aware and follows a policy centric meta-scheduling. In this paper, we demonstrate that a decentralized and dynamic meta-scheduling approach is an effective strategy to cope with increasing numbers of users, jobs and datasets. We present 'quality of service' related statistics for physics analysis through the application of a policy centric fair-share scheduling model. The DIANA meta-schedulers create a peer-to-peer hierarchy of schedulers to accomplish resource management that changes with evolving loads and is dynamic and adapts to the volatile nature of the resources

  12. 76 FR 60359 - Phytosanitary Treatments; Location of and Process for Updating Treatment Schedules; Technical...

    Science.gov (United States)

    2011-09-29

    ... supporting information and data, to the Animal and Plant Health Inspection Service, Plant Protection and... supporting information and data, to the Animal and Plant Health Inspection Service, Plant Protection and... that approved treatment schedules will instead be found in the Plant Protection and Quarantine...

  13. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  14. Probing multiband superconductivity by point-contact spectroscopy

    International Nuclear Information System (INIS)

    Daghero, D; Gonnelli, R S

    2010-01-01

    Point-contact spectroscopy was originally developed for the determination of the electron-phonon spectral function in normal metals. However, in the past 20 years it has become an important tool in the investigation of superconductors. As a matter of fact, point contacts between a normal metal and a superconductor can provide information on the amplitude and symmetry of the energy gap that, in the superconducting state, opens up at the Fermi level. In this paper we review the experimental and theoretical aspects of point-contact spectroscopy in superconductors, and we give an experimental survey of the most recent applications of this technique to anisotropic and multiband superconductors. (topical review)

  15. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  16. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  17. Contact and Non-contact Measurements of Grinding Pins

    Directory of Open Access Journals (Sweden)

    Magdziak Marek

    2015-01-01

    Full Text Available The paper presents the results of contact and non-contact measurements of external profiles of selected grinding pins. The measurements were conducted in order to choose the appropriate measuring technique in the case of the considered measurement task. In the case of contact measurements the coordinate measuring machine ACCURA II was applied. The used coordinate measuring machine was equipped with the contact scanning probe VAST XT and the Calypso inspection software. Contact coordinate measurements were performed by using of different measurement strategies. The applied strategies included different scanning velocities and distances between measured points. Non-contact measurements were conducted by means of the tool presetter produced by the Mahr company. On the basis of gained results the guidelines concerning measurements of grinding pins were formulated. The measurements of analyzed grinding pins performed by means of the non-contact measuring system are characterized by higher reproducibility than the contact measurements. The low reproducibility of contact measurements may be connected with the inaccuracy of the selected coordinate measuring machine and the measuring probe, the measurement parameters and environmental conditions in the laboratory where the coordinate measuring machine is located. Moreover, the paper presents the possible application of results of conducted investigations. The results of non-contact measurements can be used in the simulation studies of grinding processes. The simulations may reduce the costs of machining processes.

  18. Sandia National Laboratories: Contact Us

    Science.gov (United States)

    Employment (VOE) - New Mexico and California Please submit your requests by fax OR email - not both. Fax Number: (505) 845-0097, ATTN: HR Records Email Address: HR-Records@sandia.gov HR Records' Hotline: (505 in Writing Requester's Contact Information: Requester's name, company name (if applicable), phone

  19. Prevalence of α(+)-Thalassemia in the Scheduled Tribe and Scheduled Caste Populations of Damoh District in Madhya Pradesh, Central India.

    Science.gov (United States)

    Singh, Mendi P S S; Gupta, Rasik B; Yadav, Rajiv; Sharma, Ravendra K; Shanmugam, Rajasubramaniam

    2016-08-01

    This study was carried out to ascertain the allelic frequency of α(+)-thalassemia (α(+)-thal) in Scheduled caste and scheduled tribe populations of the Damoh district of Madhya Pradesh, India. Random blood samples of Scheduled tribe (267) and Scheduled caste (168), considering the family as a sampling unit, were analyzed for the presence of the -α(3.7) (rightward) (NG_000006.1: g.34164_37967del3804) and -α(4.2) (leftward) (AF221717) deletions. α(+)-Thal was significantly higher in the Scheduled tribals (77.9%) as compared to the scheduled caste population (9.0%). About 58.0% scheduled tribals carried at least one chromosome with the -α(3.7) deletion and 20.0% scheduled tribals carried the -α(4.2) deletion. Frequency for the -α(3.7) allele was 0.487 in the scheduled tribal populations in comparison to 0.021 in scheduled castes. Allelic frequency for -α(4.2) was 0.103 and 0.024, respectively, in the above communities. No Hardy-Weinberg equilibrium for α-thal gene (p population, indicating the presence of selection pressures in favor of α-thal mutation and adaptation.

  20. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  1. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  2. Synthesis of Fault-Tolerant Schedules with Transparency/Performance Trade-offs for Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Izosimov, Viacheslav; Pop, Paul; Eles, Petru

    2006-01-01

    of the application. We propose a novel algorithm for the synthesis of fault-tolerant schedules that can handle the transparency/performance trade-offs imposed by the designer, and makes use of the fault-occurrence information to reduce the overhead due to fault tolerance. We model the application as a conditional...... process graph, where the fault occurrence information is represented as conditional edges and the transparent recovery is captured using synchronization nodes....... such that the operation of other processes is not affected, we call it transparent recovery. Although transparent recovery has the advantages of fault containment, improved debugability and less memory needed to store the fault-tolerant schedules, it will introduce delays that can violate the timing constraints...

  3. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  4. Mixed waste focus area integrated master schedule (current as of May 6, 1996)

    International Nuclear Information System (INIS)

    1996-01-01

    The mission of the Mixed Waste Characterization, Treatment, and Disposal Focus Area (MWFA) is to provide acceptable treatment systems, developed in partnership with users and with the participation of stakeholders, tribal governments, and regulators, that are capable of treating the Department of Energy's (DOE's) mixed wastes. In support of this mission, the MWTA produced the Mixed Waste Focus Area Integrated Technical Baseline Report, Phase I Volume 1, January 16, 1996, which identified a prioritized list of 30 national mixed waste technology deficiencies. The MWFA is targeting funding toward technology development projects that address the current list of deficiencies. A clear connection between the technology development projects and the EM-30 and EM-40 treatment systems that they support is essential for optimizing the MWFA efforts. The purpose of the Integrated Master Schedule (IMS) is to establish and document these connections and to ensure that all technology development activities performed by the MWFA are developed for timely use in those treatment systems. The IMS is a list of treatment systems from the Site Treatment Plans (STPs)/Consent Orders that have been assigned technology development needs with associated time-driven schedules, Technology deficiencies and associated technology development (TD) needs have been identified for each treatment system based on the physical, chemical, and radiological characteristics of the waste targeted for the treatment system. The schedule, the technology development activities, and the treatment system have been verified through the operations contact from the EM-30 organization at the site

  5. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  6. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  7. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  8. Teacher Pupil Contact in Junior Classrooms

    Science.gov (United States)

    Boydell, D.

    1974-01-01

    The purpose of the exploratory study reported here was to examine the nature of teacher-pupil contact in informal junior classrooms in terms of the teacher's method of talking to children and the teacher's conversational approach. (Author/RK)

  9. Limited Preemptive Scheduling in Real-time Systems

    OpenAIRE

    Thekkilakattil, Abhilash

    2016-01-01

    Preemptive and non-preemptive scheduling paradigms typically introduce undesirable side effects when scheduling real-time tasks, mainly in the form of preemption overheads and blocking, that potentially compromise timeliness guarantees. The high preemption overheads in preemptive real-time scheduling may imply high resource utilization, often requiring significant over-provisioning, e.g., pessimistic Worst Case Execution Time (WCET) approximations. Non-preemptive scheduling, on the other hand...

  10. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  11. Selective Flotation of Calcite from Fluorite: A Novel Reagent Schedule

    Directory of Open Access Journals (Sweden)

    Zhiyong Gao

    2016-10-01

    Full Text Available Fluorite is an important strategic mineral. In general, fluorite ores will contain a certain amount of calcite gangue mineral. Thus, they need to be separated from each other. For an economic separation, a reverse flotation process is used to float calcite gangue from fluorite. However, little information on the separation is available. In this study, a novel reagent schedule using citric acid (CA as the depressant, sodium fluoride (NaF as the regulator and sulfoleic acid (SOA as the collector, was developed to separate calcite from fluorite. The results demonstrated a high selectivity for the flotation of calcite from fluorite using this new reagent schedule. The best selective separation for a single mineral and mixed binary minerals was obtained when 200 mg/L of NaF, 50 mg/L of CA, and 6 mg/L of SOA were used at pH 9. In addition, a batch flotation experiment was carried out using a run-of-mine feed material. Selective separation was achieved with 85.18% calcite removal while only 11.2% of fluorite was lost. An attempt was made to understand the effect of the new reagent schedule on the flotation of calcite. The results from both microflotation and bench scale flotation demonstrated a great potential for industrial application using this novel reagent schedule to upgrade fluorite ore.

  12. PREFACE: Non-contact AFM Non-contact AFM

    Science.gov (United States)

    Giessibl, Franz J.; Morita, Seizo

    2012-02-01

    This special issue is focussed on high resolution non-contact atomic force microscopy (AFM). Non-contact atomic force microscopy was established approximately 15 years ago as a tool to image conducting and insulating surfaces with atomic resolution. Since 1998, an annual international conference has taken place, and although the proceedings of these conferences are a useful source of information, several key developments warrant devoting a special issue to this subject. In the theoretic field, the possibility of supplementing established techniques such as scanning tunneling microscopy (STM) and Kelvin probe microscopy with atomically resolved force micrsoscopy poses many challenges in the calculation of contrast and contrast reversal. The surface science of insulators, self-assembled monolayers and adsorbates on insulators is a fruitful field for the application of non-contact AFM: several articles in this issue are devoted to these subjects. Atomic imaging and manipulation have been pioneered using STM, but because AFM allows the measurement of forces, AFM has had a profound impact in this field as well. Three-dimensional force spectroscopy has allowed many important insights into surface science. In this issue a combined 3D tunneling and force microscopy is introduced. Non-contact AFM typically uses frequency modulation to measure force gradients and was initially used mainly in a vacuum. As can be seen in this issue, frequency modulation is now also used in ambient conditions, allowing better spatial and force resolution. We thank all of the contributors for their time and efforts in making this special issue possible. We are also very grateful to the staff of IOP Publishing for handling the administrative aspects and for steering the refereeing process. Non-contact AFM contents Relation between the chemical force and the tunnelling current in atomic point contacts: a simple model Pavel Jelínek, Martin Ondrácek and Fernando Flores Theoretical simulation of

  13. Scheduling for dual-hop block-fading channels with two source-user pairs sharing one relay

    KAUST Repository

    Zafar, Ammar

    2013-09-01

    In this paper, we maximize the achievable rate region of a dual-hop network with two sources serving two users independently through a single shared relay. We formulate the problem as maximizing the sum of the weighted long term average throughputs of the two users under stability constraints on the long term throughputs of the source-user pairs. In order to solve the problem, we propose a joint user-and-hop scheduling scheme, which schedules the first or second hop opportunistically based on instantaneous channel state information, in order to exploit multiuser diversity and multihop diversity gains. Numerical results show that the proposed joint scheduling scheme enhances the achievable rate region as compared to a scheme that employs multi-user scheduling on the second-hop alone. Copyright © 2013 by the Institute of Electrical and Electronic Engineers, Inc.

  14. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    Science.gov (United States)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.

  15. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  16. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  17. Contact thermography, 99mTc-plasmin scintimetry and 99mTc-plasmin scintigraphy as screening methods for deep venous thrombosis following major hip surgery

    DEFF Research Database (Denmark)

    Christensen, S W; Wille-Jørgensen, P; Kjaer, L

    1987-01-01

    Fifty-six patients scheduled for total hip alloplasty were screened for deep venous thrombosis by means of 99mTc-plasmin scintimetry, 99mTc-plasmin scintigraphy and contact thermography. Investigations were performed on the seventh postoperative day, and a total of 112 legs were examined. Bilateral...

  18. Group Elevator Peak Scheduling Based on Robust Optimization Model

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2013-08-01

    Full Text Available Scheduling of Elevator Group Control System (EGCS is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is realized without getting exact numbers of each calling floor's waiting passengers. Specifically, energy-saving oriented multi-objective scheduling price is proposed, RO uncertain peak scheduling model is built to minimize the price. Because RO uncertain model could not be solved directly, RO uncertain model is transformed to RO certain model by elevator scheduling robust counterparts. Because solution space of elevator scheduling is enormous, to solve RO certain model in short time, ant colony solving algorithm for elevator scheduling is proposed. Based on the algorithm, optimal scheduling solutions are found quickly, and group elevators are scheduled according to the solutions. Simulation results show the method could improve scheduling performances effectively in peak pattern. Group elevators' efficient operation is realized by the RO scheduling method.

  19. An elastic-plastic contact model for line contact structures

    Science.gov (United States)

    Zhu, Haibin; Zhao, Yingtao; He, Zhifeng; Zhang, Ruinan; Ma, Shaopeng

    2018-06-01

    Although numerical simulation tools are now very powerful, the development of analytical models is very important for the prediction of the mechanical behaviour of line contact structures for deeply understanding contact problems and engineering applications. For the line contact structures widely used in the engineering field, few analytical models are available for predicting the mechanical behaviour when the structures deform plastically, as the classic Hertz's theory would be invalid. Thus, the present study proposed an elastic-plastic model for line contact structures based on the understanding of the yield mechanism. A mathematical expression describing the global relationship between load history and contact width evolution of line contact structures was obtained. The proposed model was verified through an actual line contact test and a corresponding numerical simulation. The results confirmed that this model can be used to accurately predict the elastic-plastic mechanical behaviour of a line contact structure.

  20. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  1. Job shop scheduling problem with late work criterion

    Science.gov (United States)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  2. VASCo: computation and visualization of annotated protein surface contacts

    Directory of Open Access Journals (Sweden)

    Thallinger Gerhard G

    2009-01-01

    Full Text Available Abstract Background Structural data from crystallographic analyses contain a vast amount of information on protein-protein contacts. Knowledge on protein-protein interactions is essential for understanding many processes in living cells. The methods to investigate these interactions range from genetics to biophysics, crystallography, bioinformatics and computer modeling. Also crystal contact information can be useful to understand biologically relevant protein oligomerisation as they rely in principle on the same physico-chemical interaction forces. Visualization of crystal and biological contact data including different surface properties can help to analyse protein-protein interactions. Results VASCo is a program package for the calculation of protein surface properties and the visualization of annotated surfaces. Special emphasis is laid on protein-protein interactions, which are calculated based on surface point distances. The same approach is used to compare surfaces of two aligned molecules. Molecular properties such as electrostatic potential or hydrophobicity are mapped onto these surface points. Molecular surfaces and the corresponding properties are calculated using well established programs integrated into the package, as well as using custom developed programs. The modular package can easily be extended to include new properties for annotation. The output of the program is most conveniently displayed in PyMOL using a custom-made plug-in. Conclusion VASCo supplements other available protein contact visualisation tools and provides additional information on biological interactions as well as on crystal contacts. The tool provides a unique feature to compare surfaces of two aligned molecules based on point distances and thereby facilitates the visualization and analysis of surface differences.

  3. The Information Tekhnology Share In Management Information System

    Directory of Open Access Journals (Sweden)

    Nur Zeina Maya Sari

    2015-08-01

    Full Text Available Abstract Management Information System growth cause change of role from all manager in decision making the information technology. While prima facie reason for the usage of information technology in business to support such a manner so that information system may operate better OBrienamp Marakas 2004. Its meaning with existence of information tekhnology in management information system SIM company management decision making which initially often pursued by many factor of non technical become accurately is relevant complete and on schedule

  4. Equilibrium contact angle or the most-stable contact angle?

    Science.gov (United States)

    Montes Ruiz-Cabello, F J; Rodríguez-Valverde, M A; Cabrerizo-Vílchez, M A

    2014-04-01

    It is well-established that the equilibrium contact angle in a thermodynamic framework is an "unattainable" contact angle. Instead, the most-stable contact angle obtained from mechanical stimuli of the system is indeed experimentally accessible. Monitoring the susceptibility of a sessile drop to a mechanical stimulus enables to identify the most stable drop configuration within the practical range of contact angle hysteresis. Two different stimuli may be used with sessile drops: mechanical vibration and tilting. The most stable drop against vibration should reveal the changeless contact angle but against the gravity force, it should reveal the highest resistance to slide down. After the corresponding mechanical stimulus, once the excited drop configuration is examined, the focus will be on the contact angle of the initial drop configuration. This methodology needs to map significantly the static drop configurations with different stable contact angles. The most-stable contact angle, together with the advancing and receding contact angles, completes the description of physically realizable configurations of a solid-liquid system. Since the most-stable contact angle is energetically significant, it may be used in the Wenzel, Cassie or Cassie-Baxter equations accordingly or for the surface energy evaluation. © 2013 Elsevier B.V. All rights reserved.

  5. Dynamics of the Molten Contact Line

    Science.gov (United States)

    Sonin, Ain A.; Duthaler, Gregg; Liu, Michael; Torresola, Javier; Qiu, Taiqing

    1999-01-01

    The purpose of this program is to develop a basic understanding of how a molten material front spreads over a solid that is below its melting point, arrests, and freezes. Our hope is that the work will contribute toward a scientific knowledge base for certain new applications involving molten droplet deposition, including the "printing" of arbitrary three-dimensional objects by precise deposition of individual molten microdrops that solidify after impact. Little information is available at this time on the capillarity-driven motion and arrest of molten contact line regions. Schiaffino and Sonin investigated the arrest of the contact line of a molten microcrystalline wax spreading over a subcooled solid "target" of the same material. They found that contact line arrest takes place at an apparent liquid contact angle that depends primarily on the Stefan number S=c(T(sub f) -T(sub t)/L based on the temperature difference between the fusion point and the target temperature, and proposed that contact line arrest occurs when the liquid's dynamic contact angle approaches the angle of attack of the solidification front just behind the contact line. They also showed, however, that the conventional continuum equations and boundary conditions have no meaningful solution for this angle. The solidification front angle is determined by the heat flux just behind the contact line, and the heat flux is singular at that point. By comparing experiments with numerical computations, Schiaffino and Sonin estimated that the conventional solidification model must break down within a distance of order 0.1 - 1 microns of the contact line. The physical mechanism for this breakdown is as yet undetermined, and no first-principles theory exists for the contact angle at arrest. Schiaffino and Sonin also presented a framework for understanding how to moderate Weber number molten droplet deposition in terms of similarity laws and experimentation. The study is based on experiments with three molten

  6. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  7. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  8. Difficulties in using Material Safety Data Sheets to analyse occupational exposures to contact allergens

    DEFF Research Database (Denmark)

    Friis, Ulrik F; Menné, Torkil; Flyvholm, Mari-Ann

    2015-01-01

    BACKGROUND: Information on the occurrence of contact allergens and irritants is crucial for the diagnosis of occupational contact dermatitis. Material Safety Data Sheets (MSDS) are important sources of information concerning exposures in the workplace. OBJECTIVE: From a medical viewpoint...

  9. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  10. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  11. Learning Grasp Strategies Composed of Contact Relative Motions

    Science.gov (United States)

    Platt, Robert, Jr.

    2007-01-01

    Of central importance to grasp synthesis algorithms are the assumptions made about the object to be grasped and the sensory information that is available. Many approaches avoid the issue of sensing entirely by assuming that complete information is available. In contrast, this paper proposes an approach to grasp synthesis expressed in terms of units of control that simultaneously change the contact configuration and sense information about the object and the relative manipulator-object pose. These units of control, known as contact relative motions (CRMs), allow the grasp synthesis problem to be recast as an optimal control problem where the goal is to find a strategy for executing CRMs that leads to a grasp in the shortest number of steps. An experiment is described that uses Robonaut, the NASA-JSC space humanoid, to show that CRMs are a viable means of synthesizing grasps. However, because of the limited amount of information that a single CRM can sense, the optimal control problem may be partially observable. This paper proposes expressing the problem as a k-order Markov Decision Process (MDP) and solving it using Reinforcement Learning. This approach is tested in a simulation of a two-contact manipulator that learns to grasp an object. Grasp strategies learned in simulation are tested on the physical Robonaut platform and found to lead to grasp configurations consistently.

  12. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  13. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  14. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  15. Brief-stimulus presentations on multiform tandem schedules

    OpenAIRE

    Reed, Phil

    1994-01-01

    Three experiments examined the influence of a brief stimulus (a light) on the behavior of food-deprived rats whose lever pressing on tandem schedules comprising components of different schedule types resulted in food presentation. In Experiment 1, either a tandem variable-ratio variable-interval or a tandem variable-interval variable-ratio schedule was used. The variable-interval requirement in the tandem variable-ratio variable-interval schedule was yoked to the time taken to complete the va...

  16. Consideration regarding the scheduling of unannounced or randomized inspections

    International Nuclear Information System (INIS)

    Sanborn, J.

    2001-01-01

    Full text: Randomized inspection strategies, including unannounced, short notice, or randomly selected scheduled inspections can play an useful role in integrated safeguards by allowing a reduction in the number of inspections without sacrificing coverage of diversion scenarios. The Agency and member states have proposed such strategies as important elements of integrated safeguards proposals at reactors as well as bulk handling facilities. The Agency, however, has limited experience with such inspections, and a number of issues need to be addressed before effective implementation can occur; how these issues are resolved will determine how effective the inspections will be. This paper focuses on the question of how to determine the timing of such inspections. It is pointed out that there are a large number of variants of the idea of 'randomized inspection,' and that each option will have advantages and disadvantages from the points of view of the operator, the logistics of inspection scheduling, and the capabilities for detection. The method chosen should depend on the type of scenarios that the Agency wishes to detect. The mathematically purest form of randomized schedule will have broad theoretical applicability, but may prove more difficult to put into practice, and may be unnecessary, or even sub-optimal, depending on the inspection objective. On the other hand, each restriction on inspection that provides the operator with information on when the inspection will occur must be taken into account when assessing detection probability. The paper reviews a number of scheduling approaches in the context of different objectives and considers effectiveness, operational impact, and practicality. (author)

  17. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  18. Developing optimal nurses work schedule using integer programming

    Science.gov (United States)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  19. Low-Bandwidth Channel Quality Indication for OFDMA Frequency Domain Packet Scheduling

    DEFF Research Database (Denmark)

    Kolding, Troels E.; Frederiksen, Frank; Pokhariyal, Akhilesh

    2007-01-01

    -relevant information in the CQI. We find that a 60-70% CQI bandwidth reduction is possible with less than 5-10% impact on scheduling performance. Further, we consider the impact of lowering the CQI reporting rate on both mobility performance and increased measuring accuracy due to longer averaging interval. We find...

  20. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  1. A Novel Strategy Using Factor Graphs and the Sum-Product Algorithm for Satellite Broadcast Scheduling Problems

    Science.gov (United States)

    Chen, Jung-Chieh

    This paper presents a low complexity algorithmic framework for finding a broadcasting schedule in a low-altitude satellite system, i. e., the satellite broadcast scheduling (SBS) problem, based on the recent modeling and computational methodology of factor graphs. Inspired by the huge success of the low density parity check (LDPC) codes in the field of error control coding, in this paper, we transform the SBS problem into an LDPC-like problem through a factor graph instead of using the conventional neural network approaches to solve the SBS problem. Based on a factor graph framework, the soft-information, describing the probability that each satellite will broadcast information to a terminal at a specific time slot, is exchanged among the local processing in the proposed framework via the sum-product algorithm to iteratively optimize the satellite broadcasting schedule. Numerical results show that the proposed approach not only can obtain optimal solution but also enjoys the low complexity suitable for integral-circuit implementation.

  2. Scheduling multimedia services in cloud computing environment

    Science.gov (United States)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  3. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  4. Corneal erosions, bacterial contamination of contact lenses, and microbial keratitis.

    Science.gov (United States)

    Willcox, Mark D P; Naduvilath, Thomas J; Vaddavalli, Pravin K; Holden, Brien A; Ozkan, Jerome; Zhu, Hua

    2010-11-01

    To estimate the rate of corneal erosion coupled with gram-negative bacterial contamination of contact lenses and compare this with the rate of microbial keratitis (MK) with contact lenses. The rate of corneal erosion and contact lens contamination by gram-negative bacteria were calculated from several prospective trials. These rates were used to calculate the theoretical rate of corneal erosion happening at the same time as wearing a contact lens contaminated with gram-negative bacteria. This theoretical rate was then compared with the rates of MK reported in various epidemiological and clinical trials. Corneal erosions were more frequent during extended wear (0.6-2.6% of visits) compared with daily wear (0.01-0.05% of visits). No corneal erosions were observed for lenses worn on a daily disposable basis. Contamination rates for lenses worn on a daily disposable basis were the lowest (2.4%), whereas they were the highest for low Dk lenses worn on an extended wear basis (7.1%). The estimated rate of corneal erosions occurring at the same time as wearing lenses contaminated with gram-negative bacteria was the lowest during daily wear of low Dk lenses (1.56/10,000 [95% CI: 0.23-10.57]) and the highest during extended wear of high Dk lenses (38.55/10,000 [95% CI: 24.77-60.04]). These rates were similar in magnitude to the rates reported for MK of different hydrogel lenses worn on differing wear schedules. The coincidence of corneal erosions during lens wear with gram-negative bacterial contamination of lenses may account for the relative incidence of MK during lens wear with different lens materials and modes of use.

  5. Analysis and Optimisation of Hierarchically Scheduled Multiprocessor Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2008-01-01

    We present an approach to the analysis and optimisation of heterogeneous multiprocessor embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organised in a hierarchy. In this paper, we first develop a holistic scheduling and schedulability analysis that determines the timing properties of a hierarchically scheduled system. Second, we address design problems that are characteristic to such hierarchically scheduled systems: assignment...... of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We also present several algorithms for solving these problems. Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilisation of the system...

  6. Re-scheduling nursing shifts: Scoping the challenge and examining the potential of mathematical model based tools

    OpenAIRE

    Clark, A.; Moule, P.; Topping, A.; Serpell, M.

    2015-01-01

    Aims: To review research in the literature on nursing shift scheduling/rescheduling, and report key issues identified in a listening exercise with managers in four English NHS trusts to inform the development of mathematical tools for rescheduling decision-making.\\ud Background: Shift rescheduling is unrecognised as an everyday time-consuming management task with different imperatives than scheduling. Poor rescheduling decisions can have quality, cost and morale implications.\\ud Evaluation: A...

  7. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  8. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  9. 21 CFR 113.83 - Establishing scheduled processes.

    Science.gov (United States)

    2010-04-01

    ... commercial production runs should be determined on the basis of recognized scientific methods to be of a size... CONTAINERS Production and Process Controls § 113.83 Establishing scheduled processes. Scheduled processes for... production shall be adequately provided for in establishing the scheduled process. Critical factors, e.g...

  10. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  11. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  12. 76 FR 64074 - Schedules for Atlantic Shark Identification Workshops and Protected Species Safe Handling...

    Science.gov (United States)

    2011-10-17

    .... See SUPPLEMENTARY INFORMATION for further details. FOR FURTHER INFORMATION CONTACT: Richard A. Pearson of the Highly Migratory Species Management Division at (727) 824-5399. SUPPLEMENTARY INFORMATION...

  13. 77 FR 5579 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2012-02-03

    .... Department of Homeland Security, Transportation Security Administration (N1-560-11-8, 1 item, 1 temporary... electronic information system used to track contact information for potential claimants in the US vs. City of... used to determine rail safety violations. 8. Department of the Treasury, Internal Revenue Service (N1...

  14. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  15. An improved sheep flock heredity algorithm for job shop scheduling and flow shop scheduling problems

    Directory of Open Access Journals (Sweden)

    Chandramouli Anandaraman

    2011-10-01

    Full Text Available Job Shop Scheduling Problem (JSSP and Flow Shop Scheduling Problem (FSSP are strong NP-complete combinatorial optimization problems among class of typical production scheduling problems. An improved Sheep Flock Heredity Algorithm (ISFHA is proposed in this paper to find a schedule of operations that can minimize makespan. In ISFHA, the pairwise mutation operation is replaced by a single point mutation process with a probabilistic property which guarantees the feasibility of the solutions in the local search domain. A Robust-Replace (R-R heuristic is introduced in place of chromosomal crossover to enhance the global search and to improve the convergence. The R-R heuristic is found to enhance the exploring potential of the algorithm and enrich the diversity of neighborhoods. Experimental results reveal the effectiveness of the proposed algorithm, whose optimization performance is markedly superior to that of genetic algorithms and is comparable to the best results reported in the literature.

  16. Reducing contact resistance in graphene devices through contact area patterning.

    Science.gov (United States)

    Smith, Joshua T; Franklin, Aaron D; Farmer, Damon B; Dimitrakopoulos, Christos D

    2013-04-23

    Performance of graphene electronics is limited by contact resistance associated with the metal-graphene (M-G) interface, where unique transport challenges arise as carriers are injected from a 3D metal into a 2D-graphene sheet. In this work, enhanced carrier injection is experimentally achieved in graphene devices by forming cuts in the graphene within the contact regions. These cuts are oriented normal to the channel and facilitate bonding between the contact metal and carbon atoms at the graphene cut edges, reproducibly maximizing "edge-contacted" injection. Despite the reduction in M-G contact area caused by these cuts, we find that a 32% reduction in contact resistance results in Cu-contacted, two-terminal devices, while a 22% reduction is achieved for top-gated graphene transistors with Pd contacts as compared to conventionally fabricated devices. The crucial role of contact annealing to facilitate this improvement is also elucidated. This simple approach provides a reliable and reproducible means of lowering contact resistance in graphene devices to bolster performance. Importantly, this enhancement requires no additional processing steps.

  17. Minimizing tardiness for job shop scheduling under uncertainties

    OpenAIRE

    Yahouni , Zakaria; Mebarki , Nasser; Sari , Zaki

    2016-01-01

    International audience; —Many disturbances can occur during the execution of a manufacturing scheduling process. To cope with this drawback , flexible solutions are proposed based on the offline and the online phase of the schedule. Groups of permutable operations is one of the most studied flexible scheduling methods bringing flexibility as well as quality to a schedule. The online phase of this method is based on a human-machine system allowing to choose in real-time one schedule from a set...

  18. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  19. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of... to the advertising of scheduled performance, it is the policy of the Board to regard as an unfair or...

  20. Contact Patterns in a High School: A Comparison between Data Collected Using Wearable Sensors, Contact Diaries and Friendship Surveys.

    Directory of Open Access Journals (Sweden)

    Rossana Mastrandrea

    Full Text Available Given their importance in shaping social networks and determining how information or transmissible diseases propagate in a population, interactions between individuals are the subject of many data collection efforts. To this aim, different methods are commonly used, ranging from diaries and surveys to decentralised infrastructures based on wearable sensors. These methods have each advantages and limitations but are rarely compared in a given setting. Moreover, as surveys targeting friendship relations might suffer less from memory biases than contact diaries, it is interesting to explore how actual contact patterns occurring in day-to-day life compare with friendship relations and with online social links. Here we make progresses in these directions by leveraging data collected in a French high school and concerning (i face-to-face contacts measured by two concurrent methods, namely wearable sensors and contact diaries, (ii self-reported friendship surveys, and (iii online social links. We compare the resulting data sets and find that most short contacts are not reported in diaries while long contacts have a large reporting probability, and that the durations of contacts tend to be overestimated in the diaries. Moreover, measured contacts corresponding to reported friendship can have durations of any length but all long contacts do correspond to a reported friendship. On the contrary, online links that are not also reported in the friendship survey correspond to short face-to-face contacts, highlighting the difference of nature between reported friendships and online links. Diaries and surveys suffer moreover from a low sampling rate, as many students did not fill them, showing that the sensor-based platform had a higher acceptability. We also show that, despite the biases of diaries and surveys, the overall structure of the contact network, as quantified by the mixing patterns between classes, is correctly captured by both networks of self

  1. Contact Patterns in a High School: A Comparison between Data Collected Using Wearable Sensors, Contact Diaries and Friendship Surveys.

    Science.gov (United States)

    Mastrandrea, Rossana; Fournet, Julie; Barrat, Alain

    2015-01-01

    Given their importance in shaping social networks and determining how information or transmissible diseases propagate in a population, interactions between individuals are the subject of many data collection efforts. To this aim, different methods are commonly used, ranging from diaries and surveys to decentralised infrastructures based on wearable sensors. These methods have each advantages and limitations but are rarely compared in a given setting. Moreover, as surveys targeting friendship relations might suffer less from memory biases than contact diaries, it is interesting to explore how actual contact patterns occurring in day-to-day life compare with friendship relations and with online social links. Here we make progresses in these directions by leveraging data collected in a French high school and concerning (i) face-to-face contacts measured by two concurrent methods, namely wearable sensors and contact diaries, (ii) self-reported friendship surveys, and (iii) online social links. We compare the resulting data sets and find that most short contacts are not reported in diaries while long contacts have a large reporting probability, and that the durations of contacts tend to be overestimated in the diaries. Moreover, measured contacts corresponding to reported friendship can have durations of any length but all long contacts do correspond to a reported friendship. On the contrary, online links that are not also reported in the friendship survey correspond to short face-to-face contacts, highlighting the difference of nature between reported friendships and online links. Diaries and surveys suffer moreover from a low sampling rate, as many students did not fill them, showing that the sensor-based platform had a higher acceptability. We also show that, despite the biases of diaries and surveys, the overall structure of the contact network, as quantified by the mixing patterns between classes, is correctly captured by both networks of self-reported contacts and

  2. The Danish database for acute and emergency hospital contacts

    DEFF Research Database (Denmark)

    Lassen, Annmarie T; Jørgensen, Henrik; Jørsboe, Hanne Blæhr

    2016-01-01

    AIM FOR DATABASE: Aim of the Danish database for acute and emergency hospital contacts (DDAEHC) is to monitor the quality of care for all unplanned hospital contacts in Denmark (acute and emergency contacts). STUDY POPULATION: The DDAEHC is a nationwide registry that completely covers all acute a...... and emergency hospital contacts in Denmark. The database includes specific outcome and process health care quality indicators as well as demographic and other basic information with the purpose to be used for enhancement of quality of acute care.......AIM FOR DATABASE: Aim of the Danish database for acute and emergency hospital contacts (DDAEHC) is to monitor the quality of care for all unplanned hospital contacts in Denmark (acute and emergency contacts). STUDY POPULATION: The DDAEHC is a nationwide registry that completely covers all acute...... and emergency somatic hospital visits at individual level regardless of presentation site, presenting complaint, and department designation since January 1, 2013. MAIN VARIABLES: The DDAEHC includes ten quality indicators - of which two are outcome indicators and eight are process indicators. Variables used...

  3. Prioritized Contact Transport Stream

    Science.gov (United States)

    Hunt, Walter Lee, Jr. (Inventor)

    2015-01-01

    A detection process, contact recognition process, classification process, and identification process are applied to raw sensor data to produce an identified contact record set containing one or more identified contact records. A prioritization process is applied to the identified contact record set to assign a contact priority to each contact record in the identified contact record set. Data are removed from the contact records in the identified contact record set based on the contact priorities assigned to those contact records. A first contact stream is produced from the resulting contact records. The first contact stream is streamed in a contact transport stream. The contact transport stream may include and stream additional contact streams. The contact transport stream may be varied dynamically over time based on parameters such as available bandwidth, contact priority, presence/absence of contacts, system state, and configuration parameters.

  4. Eye Contact Modulates Cognitive Processing Differently in Children with Autism

    Science.gov (United States)

    Falck-Ytter, Terje; Carlström, Christoffer; Johansson, Martin

    2015-01-01

    In humans, effortful cognitive processing frequently takes place during social interaction, with eye contact being an important component. This study shows that the effect of eye contact on memory for nonsocial information is different in children with typical development than in children with autism, a disorder of social communication. Direct…

  5. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  6. Topology-based hierarchical scheduling using deficit round robin

    DEFF Research Database (Denmark)

    Yu, Hao; Yan, Ying; Berger, Michael Stubert

    2009-01-01

    according to the topology. The mapping process could be completed through the network management plane or by manual configuration. Based on the knowledge of the network, the scheduler can manage the traffic on behalf of other less advanced nodes, avoid potential traffic congestion, and provide flow...... protection and isolation. Comparisons between hierarchical scheduling, flow-based scheduling, and class-based scheduling schemes have been carried out under a symmetric tree topology. Results have shown that the hierarchical scheduling scheme provides better flow protection and isolation from attack...

  7. 33 CFR 401.58 - Pleasure craft scheduling.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pleasure craft scheduling. 401.58... OF TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.58 Pleasure craft scheduling. (a) The transit of pleasure craft shall be scheduled by the traffic controller or the officer in...

  8. Adaptive contact networks change effective disease infectiousness and dynamics.

    Science.gov (United States)

    Van Segbroeck, Sven; Santos, Francisco C; Pacheco, Jorge M

    2010-08-19

    Human societies are organized in complex webs that are constantly reshaped by a social dynamic which is influenced by the information individuals have about others. Similarly, epidemic spreading may be affected by local information that makes individuals aware of the health status of their social contacts, allowing them to avoid contact with those infected and to remain in touch with the healthy. Here we study disease dynamics in finite populations in which infection occurs along the links of a dynamical contact network whose reshaping may be biased based on each individual's health status. We adopt some of the most widely used epidemiological models, investigating the impact of the reshaping of the contact network on the disease dynamics. We derive analytical results in the limit where network reshaping occurs much faster than disease spreading and demonstrate numerically that this limit extends to a much wider range of time scales than one might anticipate. Specifically, we show that from a population-level description, disease propagation in a quickly adapting network can be formulated equivalently as disease spreading on a well-mixed population but with a rescaled infectiousness. We find that for all models studied here--SI, SIS and SIR--the effective infectiousness of a disease depends on the population size, the number of infected in the population, and the capacity of healthy individuals to sever contacts with the infected. Importantly, we indicate how the use of available information hinders disease progression, either by reducing the average time required to eradicate a disease (in case recovery is possible), or by increasing the average time needed for a disease to spread to the entire population (in case recovery or immunity is impossible).

  9. Spike: Artificial intelligence scheduling for Hubble space telescope

    Science.gov (United States)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  10. American Contact Dermatitis Society Contact Allergy Management Program: An Epidemiologic Tool to Determine Relative Prevalence of Contact Allergens.

    Science.gov (United States)

    Scheman, Andrew; Severson, David

    2016-01-01

    Data on the prevalence of contact allergy in North America are currently reported by groups of academic contact allergy specialists at select academic centers. Sampling of data from numerous centers across North America, including practices performing more limited patch testing, would provide a broader perspective of contact allergen prevalence in North America. The American Contact Dermatitis Society Contact Allergy Management Program is an ideal tool for collection of epidemiologic data regarding contact allergy prevalence in North America. The aim of the study was to identify the relative prevalence of contact allergy to common contact allergens in North America. Mapping of Contact Allergy Management Program (CAMP) data was performed to allow analysis of how frequently searches were performed for various contact allergens. The number of searches performed for specific allergens provides a measure of the relative prevalence of contact allergy to these allergens. The top 35 allergens for the period from November 18, 2012 to November 18, 2013 are reported. Although these data are useful, specific recommendations for minor alterations to CAMP are discussed, which will allow future CAMP data to be stratified and more powerful. With minor modifications, CAMP can provide a quantum leap in the reporting of contact allergy epidemiologic data in North America.

  11. Step-by-step cyclic processes scheduling

    DEFF Research Database (Denmark)

    Bocewicz, G.; Nielsen, Izabela Ewa; Banaszak, Z.

    2013-01-01

    Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to pro......Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research...... is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS’s material handling and production routes of simultaneously manufactured...... orders, the main objective is to provide the declarative framework aimed at conditions allowing one to calculate the AGVs fleet schedule in online mode. An illustrative example of the relevant algebra-like driven step-by-stem cyclic scheduling is provided....

  12. [Ebola contacts' surveillance: social impact and ethical issues in Senegal].

    Science.gov (United States)

    Desclaux, A; Ndione, A G; Badji, D; Sow, K

    2016-10-01

    Quarantine has been widely used during the Ebola outbreak in West Africa mainly to control transmission chains. This measure raises ethical issues that require documentation of the modalities of quarantine at the field level and its social effects for contact persons. In Senegal, 74 people were in contact with the Ebola case coming from Guinea in September 2014. Of these, 34 members of the case's household were contained together at home and monitored by officers. The remaining 40 health care workers from two facilities were dispersed in their family households and monitored by telephone or during doctors' visits. The study is based on in-depth interviews with 43 adult contacts about their experiences and perceptions, with additional observation for interpretation and contextualization.Containment at home was applied differently to contacts who lived with patient zero than to professional health care contacts. No coercion was used at first since all contacts adhered to surveillance, but some of them did not fully comply with movement restrictions. Contacts found biosafety precautions stigmatizing, especially during the first days when health workers and contacts were feeling an acute fear of contagion. The material support that was provided-food and money-was necessary since contacts could not work nor get resources, but it was too limited and delayed. The relational support they received was appreciated, as well as the protection from stigmatization by the police and follow-up workers. But the information delivered to contacts was insufficient, and some of them, including health workers, had little knowledge about EVD and Ebola transmission, which caused anxiety and emotional suffering. Some contacts experienced the loss of their jobs and loss of income; several could not easily or fully return to their previous living routines.Beyond its recommendations to enhance support measures, the study identifies the ethical stakes of quarantine in Senegal regarding

  13. Prevention of bacterial colonization of contact lenses with covalently attached selenium and effects on the rabbit cornea.

    Science.gov (United States)

    Mathews, Steven M; Spallholz, Julian E; Grimson, Mark J; Dubielzig, Richard R; Gray, Tracy; Reid, Ted W

    2006-08-01

    Although silicone hydrogel materials have produced many corneal health benefits to patients wearing contact lenses, bacteria that cause acute red eye or corneal ulcers are still a concern. A coating that inhibits bacterial colonization while not adversely affecting the cornea should improve the safety of contact lens wear. A covalent selenium (Se) coating on contact lenses was evaluated for safety using rabbits and prevention of bacterial colonization of the contact lenses in vitro. Contact lenses coated with Se were worn on an extended-wear schedule for up to 2 months by 10 New Zealand White rabbits. Corneal health was evaluated with slit-lamp biomicroscopy, pachymetry, electron microscopy, and histology. Lenses worn by the rabbits were analyzed for protein and lipid deposits. In addition, the ability of Se to block bacterial colonization was tested in vitro by incubating lenses in a Pseudomonas aeruginosa broth followed by scanning electron microscopy of the contact lens surface. The covalent Se coating decreased bacterial colonization in vitro while not adversely affecting the corneal health of rabbits in vivo. The Se coating produced no noticeable negative effects as observed with slit-lamp biomicroscopy, pachymetry, electron microscopy, and histology. The Se coating did not affect protein or lipid deposition on the contact lenses. The data from this pilot study suggest that a Se coating on contact lenses might reduce acute red eye and bacterial ulceration because of an inhibition of bacterial colonization. In addition, our safety tests suggest that this positive effect can be produced without an adverse effect on corneal health.

  14. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  15. Analysis of deep learning methods for blind protein contact prediction in CASP12.

    Science.gov (United States)

    Wang, Sheng; Sun, Siqi; Xu, Jinbo

    2018-03-01

    Here we present the results of protein contact prediction achieved in CASP12 by our RaptorX-Contact server, which is an early implementation of our deep learning method for contact prediction. On a set of 38 free-modeling target domains with a median family size of around 58 effective sequences, our server obtained an average top L/5 long- and medium-range contact accuracy of 47% and 44%, respectively (L = length). A complete implementation has an average accuracy of 59% and 57%, respectively. Our deep learning method formulates contact prediction as a pixel-level image labeling problem and simultaneously predicts all residue pairs of a protein using a combination of two deep residual neural networks, taking as input the residue conservation information, predicted secondary structure and solvent accessibility, contact potential, and coevolution information. Our approach differs from existing methods mainly in (1) formulating contact prediction as a pixel-level image labeling problem instead of an image-level classification problem; (2) simultaneously predicting all contacts of an individual protein to make effective use of contact occurrence patterns; and (3) integrating both one-dimensional and two-dimensional deep convolutional neural networks to effectively learn complex sequence-structure relationship including high-order residue correlation. This paper discusses the RaptorX-Contact pipeline, both contact prediction and contact-based folding results, and finally the strength and weakness of our method. © 2017 Wiley Periodicals, Inc.

  16. Decay-usage scheduling in multiprocessors

    NARCIS (Netherlands)

    Epema, D.H.J.

    1998-01-01

    Decay-usage scheduling is a priority-aging time-sharing scheduling policy capable of dealing with a workload of both interactive and batch jobs by decreasing the priority of a job when it acquires CPU time, and by increasing its priority when it does not use the (a) CPU. In this article we deal with

  17. 76 FR 5340 - Schedules for Atlantic Shark Identification Workshops and Protected Species Safe Handling...

    Science.gov (United States)

    2011-01-31

    ... SUPPLEMENTARY INFORMATION for further details. FOR FURTHER INFORMATION CONTACT: Richard A. Pearson of the Highly Migratory Species Management Division at (727) 824-5399. SUPPLEMENTARY INFORMATION: Need for Correction In...

  18. Integration of a Course Enrolment and Class Timetable Scheduling in a Student Information System

    OpenAIRE

    Vangel V. Ajanovski

    2013-01-01

    This paper is dealing with the most important issues of two of the most significant university administrativeprocesses – the process of term enrolment with course enrolment and the process of organization of classesand scheduling a conflict-free class timetable. In the first part of the paper an introduction to the problemis set and the impact and interrelation of the two processes is explained in detail. In the second part of thepaper, the focus is on the process of class timetable schedulin...

  19. Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

    International Nuclear Information System (INIS)

    Seed, Ian; James, Paula; Mathieson, John; Judd, Laurie; Elmetti-Ramirez, Rosa; Han, Ana

    2013-01-01

    With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchange through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple organizations and

  20. Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

    Energy Technology Data Exchange (ETDEWEB)

    Seed, Ian; James, Paula [Cogentus Consulting (United States); Mathieson, John [NDA United Kingdom (United Kingdom); Judd, Laurie [NuVision Engineering, Inc. (United States); Elmetti-Ramirez, Rosa; Han, Ana [US DOE (United States)

    2013-07-01

    With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchange through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple organizations and

  1. Quality-aware scheduling for key-value data stores

    CERN Document Server

    Xu, Chen

    2015-01-01

    This book comprehensively illustrates quality-ware scheduling in key-value stores. In addition, it provides scheduling strategies and a prototype framework of quality-aware scheduler as well as a demonstration of online applications. The book offers a rich blend of theory and practice which is suitable for students, researchers and practitioners interested in distributed systems, NoSQL key-value stores and scheduling.

  2. Language Contact.

    Science.gov (United States)

    Nelde, Peter Hans

    1995-01-01

    Examines the phenomenon of language contact and recent trends in linguistic contact research, which focuses on language use, language users, and language spheres. Also discusses the role of linguistic and cultural conflicts in language contact situations. (13 references) (MDM)

  3. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  4. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    . In this paper, we propose a novel nonblocking scheduling mechanism that is used prior to the actual service invocations. Its aim is to reach an agreement between the client and all participating providers on what transaction processing times have to be expected, accepted, and guaranteed. This enables service......For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...... schedulers of service providers typically do take into account neither time constraints for committing the whole transaction, nor the individual services' constraints when scheduling decisions are made. This often leads to an unnecessary blocking of transactions by (possibly long-running) others...

  5. The Nature Contact Questionnaire: a measure of healthy workplace exposure.

    Science.gov (United States)

    Largo-Wight, Erin; Chen, W William; Dodd, Virginia; Weiler, Robert

    2011-01-01

    Understanding and promoting healthy workplaces is an important and growing area of interest in occupational health. Nature contact is a central component to the study of and promotion of healthy places. Previous findings suggest that nature contact influences health via stress appraisal process. Currently, there are no known comprehensive valid and reliable measures of nature contact, which presents obstacles to research and worksite health promotion. This study was designed to develop and test an instrument to measure nature contact at work, entitled the Nature Contact Questionnaire (NCQ), 16-item self-reported checklist to measure actual exposure. A sample of 503 (30% response rate) office staff completed the questionnaire. Office staff were sent an email with a link to the electronic survey twice, two weeks apart. Content and construct validity (KMO=0.68), internal consistency (Alpha=0.64), and test-retest reliability (r=0.85, pnature contact, which allows research to compare forms of nature contact to best inform practice and design of healthy places.

  6. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  7. 75 FR 67431 - State-40, Employee Contact Records

    Science.gov (United States)

    2010-11-02

    ... contact information and employment type (government or contractor). AUTHORITY FOR MAINTENANCE OF THE... is not limited to two-factor authentication and time out function. All users with authorized access...

  8. Toward an Autonomous Telescope Network: the TBT Scheduler

    Science.gov (United States)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  9. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  10. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  11. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  12. A Gas Scheduling Optimization Model for Steel Enterprises

    Directory of Open Access Journals (Sweden)

    Niu Honghai

    2017-01-01

    Full Text Available Regarding the scheduling problems of steel enterprises, this research designs the gas scheduling optimization model according to the rules and priorities. Considering different features and the process changes of the gas unit in the process of actual production, the calculation model of process state and gas consumption soft measurement together with the rules of scheduling optimization is proposed to provide the dispatchers with real-time gas using status of each process, then help them to timely schedule and reduce the gas volume fluctuations. In the meantime, operation forewarning and alarm functions are provided to avoid the abnormal situation in the scheduling, which has brought about very good application effect in the actual scheduling and ensures the safety of the gas pipe network system and the production stability.

  13. Where do we stand with fuzzy project scheduling?

    CERN Document Server

    Bonnal, Pierre; Lacoste, Germain

    2004-01-01

    Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project- scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.

  14. Job schedulers for Big data processing in Hadoop environment: testing real-life schedulers using benchmark programs

    Directory of Open Access Journals (Sweden)

    Mohd Usama

    2017-11-01

    Full Text Available At present, big data is very popular, because it has proved to be much successful in many fields such as social media, E-commerce transactions, etc. Big data describes the tools and technologies needed to capture, manage, store, distribute, and analyze petabyte or larger-sized datasets having different structures with high speed. Big data can be structured, unstructured, or semi structured. Hadoop is an open source framework that is used to process large amounts of data in an inexpensive and efficient way, and job scheduling is a key factor for achieving high performance in big data processing. This paper gives an overview of big data and highlights the problems and challenges in big data. It then highlights Hadoop Distributed File System (HDFS, Hadoop MapReduce, and various parameters that affect the performance of job scheduling algorithms in big data such as Job Tracker, Task Tracker, Name Node, Data Node, etc. The primary purpose of this paper is to present a comparative study of job scheduling algorithms along with their experimental results in Hadoop environment. In addition, this paper describes the advantages, disadvantages, features, and drawbacks of various Hadoop job schedulers such as FIFO, Fair, capacity, Deadline Constraints, Delay, LATE, Resource Aware, etc, and provides a comparative study among these schedulers.

  15. Conceptual design and implementation of Pulse Automation and Scheduling System for KSTAR

    International Nuclear Information System (INIS)

    Lee, Woongryol; Lee, Taegu; Park, Jinseop; Hong, Jaesic; Hahn, Sanghee; Han, Hyunsun; Woo, Minho; Park, Kaprai

    2015-01-01

    Highlights: • The world clock based automatic sequential operation manipulator. • Configuration of the Pulse Automation System (PAS) and the Pulse Scheduling System (PSS) • Providing of operational information in voice through an Ethernet interface. • A perceptional operation status, easy time manipulator, and intuitive man machine interface for the purpose of the Tokamak operation. • Generation of the plasma disruption information. - Abstract: The world clock based automatic sequential operation manipulator has been developed and begin to work on the 7th campaign in KSTAR Tokamak. The Pulse Automation and Scheduling System (PASS) divided into Pulse Automation System (PAS) and Pulse Scheduling System (PSS). The PAS is on the online control system and it has communicated with many other local control systems. Before PASS, the plasma experiment was performed manually by using Central Control System (CCS). However the PASS currently manipulates the sequential operation of KSTAR with the programmed shot interval time. It provides readiness check routine, shot time handler, and local system monitoring functions. The PASS has no hardware dependency and it was configured with EPICS extensions. The Real Time Monitoring System, PCS-GATE, Automatic Reporting System, Central Control System, and Timing Synchronization System are well organized and they communicate to each other. The PASS provides perceptual operation status, easy time manipulator, and intuitive man machine interface. The plasma disruption information which is used in the KSTAR standard software framework also comes from the PASS. We describe the functions and system architecture of the Pulse Automation System in this paper. The PSS will be specified inside PASS for the purpose of intelligent system parameterization.

  16. Conceptual design and implementation of Pulse Automation and Scheduling System for KSTAR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Woongryol, E-mail: wrlee@nfri.re.kr; Lee, Taegu; Park, Jinseop; Hong, Jaesic; Hahn, Sanghee; Han, Hyunsun; Woo, Minho; Park, Kaprai

    2015-10-15

    Highlights: • The world clock based automatic sequential operation manipulator. • Configuration of the Pulse Automation System (PAS) and the Pulse Scheduling System (PSS) • Providing of operational information in voice through an Ethernet interface. • A perceptional operation status, easy time manipulator, and intuitive man machine interface for the purpose of the Tokamak operation. • Generation of the plasma disruption information. - Abstract: The world clock based automatic sequential operation manipulator has been developed and begin to work on the 7th campaign in KSTAR Tokamak. The Pulse Automation and Scheduling System (PASS) divided into Pulse Automation System (PAS) and Pulse Scheduling System (PSS). The PAS is on the online control system and it has communicated with many other local control systems. Before PASS, the plasma experiment was performed manually by using Central Control System (CCS). However the PASS currently manipulates the sequential operation of KSTAR with the programmed shot interval time. It provides readiness check routine, shot time handler, and local system monitoring functions. The PASS has no hardware dependency and it was configured with EPICS extensions. The Real Time Monitoring System, PCS-GATE, Automatic Reporting System, Central Control System, and Timing Synchronization System are well organized and they communicate to each other. The PASS provides perceptual operation status, easy time manipulator, and intuitive man machine interface. The plasma disruption information which is used in the KSTAR standard software framework also comes from the PASS. We describe the functions and system architecture of the Pulse Automation System in this paper. The PSS will be specified inside PASS for the purpose of intelligent system parameterization.

  17. Evaluation of anti-tuberculosis antibodies in healthy contact and non-contacts persons

    International Nuclear Information System (INIS)

    Aziz, N; Bukhari, M.H; Muneer, M; Tayyab, M; Chaudhry, N.A.

    2006-01-01

    This study was conducted to see the presence of the antimycobacterial antibodies in healthy household contacts of tuberculosis patients and healthy normal subjects who have never been in contact with tuberculosis patients. A total of 200 subjects, 120 with history of household contact and 80 without such history were included in the study. Routine Haematological investigations were performed and all the sera of 200 subjects were tested who 19M, 19G and IgA anti tuberculosis antibodies using ELISA technique. There was no difference in the average age of the household contacts and non-contacts. The complaints of pyrexia, night sweats and loss of weight was more in house hold contacts as compared to non-contacts. The awareness about BCG vaccination was equal among the household contacts and non-contacts. The combined serological positivity of the household contacts was 65.8% and the combined serological positivity for non-contacts was 34.1%. There was no statistically significant difference in the presence of 19M among household contacts as compared to non-contacts. However both IgG and 19A were present in significantly higher number of household contacts as compared to non contacts. This study concludes that the persons living in the house with a patient suffering from active pulmonary tuberculosis (household contact) have more chances of being infected with Mycobacterium tuberculosis as compared to the healthy non-contacts. (author)

  18. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  19. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  20. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  1. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  2. Scheduling job shop - A case study

    Science.gov (United States)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  3. The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Denis Pinha

    2016-11-01

    Full Text Available This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practical situations where the definition of optimal changes on a regular basis. The proposed approach empowers the project manager to determine what is optimal, on a given day, under the current constraints, such as, change of priorities, lack of skilled worker. The proposed method utilizes a simulation approach to determine feasible solutions, under the current constraints. Resources can be non-consumable, consumable, or doubly constrained. The paper also presents a real-life case study dealing with scheduling of ship repair activities.

  4. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  5. Scientific Challenges in the Risk Assessment of Food Contact Materials

    DEFF Research Database (Denmark)

    Muncke, Jane; Backhaus, Thomas; Geueke, Birgit

    2017-01-01

    formed in the production processes. Several factors hamper effective RA for many FCMs, including a lack of information on chemical identity, inadequate assessment of hazardous properties, and missing exposure data. Companies make decisions about the safety of some food contact chemicals (FCCs) without......Food contact articles (FCAs) are manufactured from food contact materials (FCMs) that include plastics, paper, metal, glass, and printing inks. Chemicals can migrate from FCAs into food during storage, processing, and transportation. Food contact materials' safety is evaluated using chemical risk...... to enhance the safety of food contact articles. Based on our evaluation of the evidence, we conclude that current regulations are insufficient for addressing chemical exposures from FCAs. RA currently focuses on monomers and additives used in the manufacture of products, but it does not cover all substances...

  6. Robust Optimization for Household Load Scheduling with Uncertain Parameters

    Directory of Open Access Journals (Sweden)

    Jidong Wang

    2018-04-01

    Full Text Available Home energy management systems (HEMS face many challenges of uncertainty, which have a great impact on the scheduling of home appliances. To handle the uncertain parameters in the household load scheduling problem, this paper uses a robust optimization method to rebuild the household load scheduling model for home energy management. The model proposed in this paper can provide the complete robust schedules for customers while considering the disturbance of uncertain parameters. The complete robust schedules can not only guarantee the customers’ comfort constraints but also cooperatively schedule the electric devices for cost minimization and load shifting. Moreover, it is available for customers to obtain multiple schedules through setting different robust levels while considering the trade-off between the comfort and economy.

  7. Safety, Quality, Schedule: the motto of LS1

    CERN Multimedia

    2013-01-01

    The LHC’s first long shutdown, LS1, is a marathon that began on 16 February and will take us through to the beginning of 2015. Just as Olympic marathon runners have a motto, Citius, Altius, Fortius, so the athletes of LS1 work to the mantra of Safety, Quality, Schedule. Four months into LS1, they have settled into their rhythm, and things are going to plan.   The first task of LS1 was to bring the LHC up to room temperature - this was achieved in just 10 weeks. In parallel, preliminary tests for electrical quality assurance and leaks revealed essentially the level of wear and tear we’d expect after three years of running. One slightly anxious moment came when we looked at the RF fingers – the devices that ensure electrical contact in the beam pipes as they pass from one magnet to the next. Those of you with long memories will recall that before start-up, some of these got damaged at warm-up. The good news today is that with all eight sectors test...

  8. The robust schedule - A link to improved workflow

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    -down the contractors, and force them to rigorously adhere to the initial schedule. If delayed the work-pace or manpower has to be increased to observe the schedule. In attempt to improve productivity three independent site-mangers have been interviewed about time-scheduling. Their experiences and opinions have been...... analyzed and weaknesses in existing time scheduling have been found. The findings showed a negative side effect of keeping the schedule to tight. A too tight schedule is inflexible and cannot absorb variability in production. Flexibility is necessary because of the contractors interacting and dependable....... The result is a chaotic, complex and uncontrolled construction site. Furthermore, strict time limits entail the workflow to be optimized under non-optimal conditions. Even though productivity seems to be increasing, productivity per man-hour is decreasing resulting in increased cost. To increase productivity...

  9. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  10. Parents' nonstandard work schedules and child well-being: a critical review of the literature.

    Science.gov (United States)

    Li, Jianghong; Johnson, Sarah E; Han, Wen-Jui; Andrews, Sonia; Kendall, Garth; Strazdins, Lyndall; Dockery, Alfred

    2014-02-01

    This paper provides a comprehensive review of empirical evidence linking parental nonstandard work schedules to four main child developmental outcomes: internalizing and externalizing problems, cognitive development, and body mass index. We evaluated the studies based on theory and methodological rigor (longitudinal data, representative samples, consideration of selection and information bias, confounders, moderators, and mediators). Of 23 studies published between 1980 and 2012 that met the selection criteria, 21 reported significant associations between nonstandard work schedules and an adverse child developmental outcome. The associations were partially mediated through parental depressive symptoms, low quality parenting, reduced parent-child interaction and closeness, and a less supportive home environment. These associations were more pronounced in disadvantaged families and when parents worked such schedules full time. We discuss the nuance, strengths, and limitations of the existing studies, and propose recommendations for future research.

  11. Learners’ Perceptions of the Effectiveness of Spaced Learning Schedule in L2 Vocabulary Learning

    Directory of Open Access Journals (Sweden)

    Amir Reza Lotfolahi

    2016-05-01

    Full Text Available The spacing effect is a ubiquitous phenomenon, whereby memory is enhanced for the information that is learned across different points in time rather than being learned at once. A considerable amount of research has focused on the nature of the spacing effect, and there is general acceptance that spacing learning events out in time promotes learning. However, fewer studies have been conducted in educational settings. The aim of this study is to explore learners’ perceptions of different spacing schedules (massed vs. spaced. To achieve the purpose of the study, we taught 30 children 24 English–Farsi word pairs utilizing different spacing schedules. Later, we administered a questionnaire to explore leaarners’ perceptions of both massed and spaced schedules. The results revealed that the children percieved spaced practice to be more effective than massed practice.

  12. Scheduling Diet for Diabetes Mellitus Patients using Genetic Algorithm

    Science.gov (United States)

    Syahputra, M. F.; Felicia, V.; Rahmat, R. F.; Budiarto, R.

    2017-01-01

    Diabetes Melitus (DM) is one of metabolic diseases which affects on productivity and lowers the human resources quality. This disease can be controlled by maintaining and regulating balanced and healthy lifestyle especially for daily diet. However, nowadays, there is no system able to help DM patient to get any information of proper diet. Therefore, an approach is required to provide scheduling diet every day in a week with appropriate nutrition for DM patients to help them regulate their daily diet for healing this disease. In this research, we calculate the number of caloric needs using Harris-Benedict equation and propose genetic algorithm for scheduling diet for DM patient. The results show that the greater the number of individuals, the greater the more the possibility of changes in fitness score approaches the best fitness score. Moreover, the greater the created generation, the more the opportunites to obtain best individual with fitness score approaching 0 or equal to 0.

  13. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  14. Tracking social contact networks with online respondent-driven detection : who recruits whom?

    NARCIS (Netherlands)

    Stein, Mart L.; van der Heijden, P.G.M.; Buskens, V.W.; van Steenbergen, Jim E.; Bengtsson, Linus; Koppeschaar, Carl E.; Thorson, Anna E.; Kretzschmar, Mirjam E. E.

    2015-01-01

    Background: Transmission of respiratory pathogens in a population depends on the contact network patterns of individuals. To accurately understand and explain epidemic behaviour information on contact networks is required, but only limited empirical data is available. Online respondent-driven

  15. Tracking social contact networks with online respondent-driven detection : who recruits whom?

    NARCIS (Netherlands)

    Stein, Mart L; van der Heijden, Peter G M; Buskens, Vincent; van Steenbergen, Jim E; Bengtsson, Linus; Koppeschaar, Carl E; Thorson, Anna; Kretzschmar, MEE

    2015-01-01

    BACKGROUND: Transmission of respiratory pathogens in a population depends on the contact network patterns of individuals. To accurately understand and explain epidemic behaviour information on contact networks is required, but only limited empirical data is available. Online respondent-driven

  16. A multi-group and preemptable scheduling of cloud resource based on HTCondor

    Science.gov (United States)

    Jiang, Xiaowei; Zou, Jiaheng; Cheng, Yaodong; Shi, Jingyan

    2017-10-01

    Due to the features of virtual machine-flexibility, easy controlling and various system environments, more and more fields utilize the virtualization technology to construct the distributed system with the virtual resources, also including high energy physics. This paper introduce a method used in high energy physics that supports multiple resource group and preemptable cloud resource scheduling, combining virtual machine with HTCondor (a batch system). It makes resource controlling more flexible and more efficient and makes resource scheduling independent of job scheduling. Firstly, the resources belong to different experiment-groups, and the type of user-groups mapping to resource-groups(same as experiment-group) is one-to-one or many-to-one. In order to make the confused group simply to be managed, we designed the permission controlling component to ensure that the different resource-groups can get the suitable jobs. Secondly, for the purpose of elastically allocating resources for suitable resource-group, it is necessary to schedule resources like scheduling jobs. So this paper designs the cloud resource scheduling to maintain a resource queue and allocate an appropriate amount of virtual resources to the request resource-group. Thirdly, in some kind of situations, because of the resource occupied for a long time, resources need to be preempted. This paper adds the preemption function for the resource scheduling that implement resource preemption based on the group priority. Additionally, the way to preempting is soft that when virtual resources are preempted, jobs will not be killed but also be held and rematched later. It is implemented with the help of HTCondor, storing the held job information in scheduler, releasing the job to idle status and doing second matcher. In IHEP (institute of high energy physics), we have built a batch system based on HTCondor with a virtual resources pool based on Openstack. And this paper will show some cases of experiment JUNO

  17. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  18. Identification of residue pairing in interacting β-strands from a predicted residue contact map.

    Science.gov (United States)

    Mao, Wenzhi; Wang, Tong; Zhang, Wenxuan; Gong, Haipeng

    2018-04-19

    Despite the rapid progress of protein residue contact prediction, predicted residue contact maps frequently contain many errors. However, information of residue pairing in β strands could be extracted from a noisy contact map, due to the presence of characteristic contact patterns in β-β interactions. This information may benefit the tertiary structure prediction of mainly β proteins. In this work, we propose a novel ridge-detection-based β-β contact predictor to identify residue pairing in β strands from any predicted residue contact map. Our algorithm RDb 2 C adopts ridge detection, a well-developed technique in computer image processing, to capture consecutive residue contacts, and then utilizes a novel multi-stage random forest framework to integrate the ridge information and additional features for prediction. Starting from the predicted contact map of CCMpred, RDb 2 C remarkably outperforms all state-of-the-art methods on two conventional test sets of β proteins (BetaSheet916 and BetaSheet1452), and achieves F1-scores of ~ 62% and ~ 76% at the residue level and strand level, respectively. Taking the prediction of the more advanced RaptorX-Contact as input, RDb 2 C achieves impressively higher performance, with F1-scores reaching ~ 76% and ~ 86% at the residue level and strand level, respectively. In a test of structural modeling using the top 1 L predicted contacts as constraints, for 61 mainly β proteins, the average TM-score achieves 0.442 when using the raw RaptorX-Contact prediction, but increases to 0.506 when using the improved prediction by RDb 2 C. Our method can significantly improve the prediction of β-β contacts from any predicted residue contact maps. Prediction results of our algorithm could be directly applied to effectively facilitate the practical structure prediction of mainly β proteins. All source data and codes are available at http://166.111.152.91/Downloads.html or the GitHub address of https://github.com/wzmao/RDb2C .

  19. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  20. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  1. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  2. Fast Grasp Contact Computation for a Serial Robot

    Science.gov (United States)

    Shi, Jianying (Inventor); Hargrave, Brian (Inventor); Diftler, Myron A. (Inventor)

    2015-01-01

    A system includes a controller and a serial robot having links that are interconnected by a joint, wherein the robot can grasp a three-dimensional (3D) object in response to a commanded grasp pose. The controller receives input information, including the commanded grasp pose, a first set of information describing the kinematics of the robot, and a second set of information describing the position of the object to be grasped. The controller also calculates, in a two-dimensional (2D) plane, a set of contact points between the serial robot and a surface of the 3D object needed for the serial robot to achieve the commanded grasp pose. A required joint angle is then calculated in the 2D plane between the pair of links using the set of contact points. A control action is then executed with respect to the motion of the serial robot using the required joint angle.

  3. Apparent contact angle and contact angle hysteresis on liquid infused surfaces.

    Science.gov (United States)

    Semprebon, Ciro; McHale, Glen; Kusumaatmaja, Halim

    2016-12-21

    We theoretically investigate the apparent contact angle and contact angle hysteresis of a droplet placed on a liquid infused surface. We show that the apparent contact angle is not uniquely defined by material parameters, but also has a dependence on the relative size between the droplet and its surrounding wetting ridge formed by the infusing liquid. We derive a closed form expression for the contact angle in the limit of vanishing wetting ridge, and compute the correction for small but finite ridge, which corresponds to an effective line tension term. We also predict contact angle hysteresis on liquid infused surfaces generated by the pinning of the contact lines by the surface corrugations. Our analytical expressions for both the apparent contact angle and contact angle hysteresis can be interpreted as 'weighted sums' between the contact angles of the infusing liquid relative to the droplet and surrounding gas phases, where the weighting coefficients are given by ratios of the fluid surface tensions.

  4. Compliance and hygiene behaviour among soft contact lens wearers in the Maldives.

    Science.gov (United States)

    Gyawali, Rajendra; Nestha Mohamed, Fathimath; Bist, Jeewanand; Kandel, Himal; Marasini, Sanjay; Khadka, Jyoti

    2014-01-01

    Significant levels of non-compliance and poor hygiene among contact lens wearers have been reported previously from different parts of the world. This survey aimed at identifying the scope of hygiene and non-compliant behaviour of soft contact lens wearers in the Maldives. Established soft lens wearers attending two eye clinics in Male' city, were interviewed in office or via telephone. A set of interviewer-administered questions was used to access the subjective response on compliance and hygiene behaviour (hand and lens case hygiene, water exposure, adherence to lens replacement schedule, dozing and overnight wear, awareness of aftercare visits and reuse of disinfecting solution). Participants were also asked to rate themselves as a contact lens user based on their perceived compliance and hygiene practices. Out of 107 participants, 79 (74.8 per cent) were interviewed in the office and the rest via telephone. The majority of lens wearers were female, office workers and students, with a mean age of 20.64 ± 4.4 years. Mean duration of lens wear was 28.04 ± 8.36 months. Most of them were using spherical lenses (86.9 per cent) on a daily wear basis (96.3 per cent). Major reported forms of non-compliance were poor hand hygiene (60.7 per cent), lack of aftercare awareness (39.3 per cent), water exposure (35.5 per cent) and over-use of lenses (24.3 per cent). While females were more likely to overuse their lenses than males (p hygienic behaviour. A significant number of Maldivian contact lens wearers exhibited poor levels of hygiene and compliance with contact lenses and lens care systems. An effective educational reinforcement strategy needs to be developed to modify lens wearers' non-compliance. © 2013 The Authors. Clinical and Experimental Optometry © 2013 Optometrists Association Australia.

  5. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  6. Evaluation of metal–nanowire electrical contacts by measuring contact end resistance

    International Nuclear Information System (INIS)

    Park, Hongsik; Beresford, Roderic; Xu, Jimmy; Ha, Ryong; Choi, Heon-Jin; Shin, Hyunjung

    2012-01-01

    It is known, but often unappreciated, that the performance of nanowire (NW)-based electrical devices can be significantly affected by electrical contacts between electrodes and NWs, sometimes to the extent that it is really the contacts that determine the performance. To correctly understand and design NW device operation, it is thus important to carefully measure the contact resistance and evaluate the contact parameters, specific contact resistance and transfer length. A four-terminal pattern or a transmission line model (TLM) pattern has been widely used to measure contact resistance of NW devices and the TLM has been typically used to extract contact parameters of NW devices. However, the conventional method assumes that the electrical properties of semiconducting NW regions covered by a metal are not changed after electrode formation. In this study, we report that the conventional methods for contact evaluation can give rise to considerable errors because of an altered property of the NW under the electrodes. We demonstrate that more correct contact resistance can be measured from the TLM pattern rather than the four-terminal pattern and correct contact parameters including the effects of changed NW properties under electrodes can be evaluated by using the contact end resistance measurement method. (paper)

  7. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  8. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  9. Operational Excellence through Schedule Optimization and Production Simulation of Application Specific Integrated Circuits.

    Energy Technology Data Exchange (ETDEWEB)

    Flory, John Andrew [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Padilla, Denise D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gauthier, John H. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Zwerneman, April Marie [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Miller, Steven P [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-05-01

    Upcoming weapon programs require an aggressive increase in Application Specific Integrated Circuit (ASIC) production at Sandia National Laboratories (SNL). SNL has developed unique modeling and optimization tools that have been instrumental in improving ASIC production productivity and efficiency, identifying optimal operational and tactical execution plans under resource constraints, and providing confidence in successful mission execution. With ten products and unprecedented levels of demand, a single set of shared resources, highly variable processes, and the need for external supplier task synchronization, scheduling is an integral part of successful manufacturing. The scheduler uses an iterative multi-objective genetic algorithm and a multi-dimensional performance evaluator. Schedule feasibility is assessed using a discrete event simulation (DES) that incorporates operational uncertainty, variability, and resource availability. The tools provide rapid scenario assessments and responses to variances in the operational environment, and have been used to inform major equipment investments and workforce planning decisions in multiple SNL facilities.

  10. Contact allergy to preservatives in patients with occupational contact dermatitis and exposure analysis of preservatives in registered chemical products for occupational use.

    Science.gov (United States)

    Schwensen, Jakob Ferløv; Friis, Ulrik Fischer; Menné, Torkil; Flyvholm, Mari-Ann; Johansen, Jeanne Duus

    2017-05-01

    The aim of the study is to investigate risk factors for sensitization to preservatives and to examine to which extent different preservatives are registered in chemical products for occupational use in Denmark. A retrospective epidemiological observational analysis of data from a university hospital was conducted. All patients had occupational contact dermatitis and were consecutively patch tested with 11 preservatives from the European baseline series and extended patch test series during a 5-year period: 2009-2013. Information regarding the same preservatives in chemical products for occupational use ('substances and materials') registered in the Danish Product Register Database (PROBAS) was obtained. The frequency of preservative contact allergy was 14.2% (n = 141) in 995 patients with occupational contact dermatitis. Patients with preservative contact allergy had significantly more frequently facial dermatitis (19.9 versus 13.1%) and age > 40 years (71.6 versus 45.8%) than patients without preservative contact allergy, whereas atopic dermatitis was less frequently observed (12.1 versus 19.8%). Preservative contact allergy was more frequent in painters with occupational contact dermatitis as compared to non-painters with occupational contact dermatitis (p contact allergy to methylisothiazolinone and contact allergy to formaldehyde. Analysis of the registered substances and materials in PROBAS revealed that preservatives occurred in several product categories, e.g., 'paints and varnishes', 'cleaning agents', 'cooling agents', and 'polishing agents'. Formaldehyde and isothiazolinones were extensively registered in PROBAS. The extensive use of formaldehyde and isothiazolinones in chemical products for occupational use may be problematic for the worker. Appropriate legislation, substitution, and employee education should be prioritized.

  11. Diverse task scheduling for individualized requirements in cloud manufacturing

    Science.gov (United States)

    Zhou, Longfei; Zhang, Lin; Zhao, Chun; Laili, Yuanjun; Xu, Lida

    2018-03-01

    Cloud manufacturing (CMfg) has emerged as a new manufacturing paradigm that provides ubiquitous, on-demand manufacturing services to customers through network and CMfg platforms. In CMfg system, task scheduling as an important means of finding suitable services for specific manufacturing tasks plays a key role in enhancing the system performance. Customers' requirements in CMfg are highly individualized, which leads to diverse manufacturing tasks in terms of execution flows and users' preferences. We focus on diverse manufacturing tasks and aim to address their scheduling issue in CMfg. First of all, a mathematical model of task scheduling is built based on analysis of the scheduling process in CMfg. To solve this scheduling problem, we propose a scheduling method aiming for diverse tasks, which enables each service demander to obtain desired manufacturing services. The candidate service sets are generated according to subtask directed graphs. An improved genetic algorithm is applied to searching for optimal task scheduling solutions. The effectiveness of the scheduling method proposed is verified by a case study with individualized customers' requirements. The results indicate that the proposed task scheduling method is able to achieve better performance than some usual algorithms such as simulated annealing and pattern search.

  12. Joint Scheduling Optimization of Virtual Power Plants and Equitable Profit Distribution Using Shapely Value Theory

    Directory of Open Access Journals (Sweden)

    Zhong-fu Tan

    2018-01-01

    Full Text Available The installation capacity of wind and solar photovoltaic power is continually increasing, which makes renewable energy grid connection and power generation an important link of China’s power structure optimization. A virtual power plant (VPP is an important way to help distributed energy resource grid connection and promote renewable energy industry development. To study the economic scheduling problem of various distributed energy resources and the profit distribution problem of VPP alliance, this study builds a separate operation scheduling model for individual VPP and a joint operation scheduling model for VPP alliance, as well as the profit distribution model. The case study verifies the feasibility and effectiveness of the proposed model. The sensitivity analysis provides information about VPP decision-making in accordance with the policy environment development trend.

  13. Contextualizing Intergroup Contact: Do Political Party Cues Enhance Contact Effects?

    DEFF Research Database (Denmark)

    Sønderskov, Kim Mannemar; Thomsen, Jens Peter Frølund

    2015-01-01

    This article examines intergroup contact effects in different political contexts. We expand on previous efforts of social psychologists by incorporating the messages of political parties as a contextual trigger of group membership awareness in contact situations. We argue that the focus among...... political parties on us-them categorizations heightens the awareness of group memberships. This focus in turn enhances the positive intergroup contact effect by stimulating majority members to perceive contacted persons as prototypical outgroup members. A multilevel analysis of 22 countries and almost 37......,000 individuals confirms that the ability of intergroup contact to reduce antiforeigner sentiment increases when political parties focus intensively on immigration issues and cultural differences. Specifically, both workplace contact and interethnic friendship become more effective in reducing antiforeigner...

  14. Schedules of controlled substances: temporary placement of three synthetic cannabinoids into Schedule I. Final order.

    Science.gov (United States)

    2013-05-16

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule three synthetic cannabinoids under the Controlled Substances Act (CSA) pursuant to the temporary scheduling provisions of 21 U.S.C. 811(h). The substances are (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48). This action is based on a finding by the Deputy Administrator that the placement of these synthetic cannabinoids and their salts, isomers and salts of isomers into Schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the full effect of the CSA and the Controlled Substances Import and Export Act (CSIEA) and their implementing regulations including criminal, civil and administrative penalties, sanctions and regulatory controls of Schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic cannabinoids.

  15. Integration of Building Information Modeling and Critical Path Method Schedules to Simulate the Impact of Temperature and Humidity at the Project Level

    Directory of Open Access Journals (Sweden)

    Yongwei Shan

    2014-07-01

    Full Text Available Steel construction activities are often undertaken in an environment with limited climate control. Both hot and cold temperatures can physically and psychologically affect construction workers, thus decreasing their productivity. Temperature and humidity are two factors that constantly exert forces on workers and influence their performance and efficiency. Previous studies have established a relationship between labor productivity and temperature and humidity. This research is built on the existing body of knowledge and develops a framework of integrating building information modeling (BIM with a lower level critical path method (CPM schedule to simulate the overall impact of temperature and humidity on a healthcare facility’s structural steel installation project in terms of total man hours required to build the project. This research effort utilized historical weather data of four cities across the U.S., with each city having workable seasons year-round and conducted a baseline assessment to test if various project starting dates and locations could significantly impact the project’s schedule performance. It was found that both varied project start dates and locations can significantly contribute to the difference in the man hours required to build the model project and that the project start date and location can have an interaction effect. This study contributes to the overall body of knowledge by providing a framework that can help practitioners better understand the overall impact of a productivity influencing factor at a project level, in order to facilitate better decision making.

  16. Interoceanic canal excavation scheduling via computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Baldonado, Orlino C [Holmes and Narver, Inc., Los Angeles, CA (United States)

    1970-05-15

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  17. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  18. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... domestic law and international conventions and agreements adopted by the United States; such terminal... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  19. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  20. Solving project scheduling problems by minimum cut computations

    NARCIS (Netherlands)

    Möhring, R.H.; Schulz, A.S.; Stork, F.; Uetz, Marc Jochen

    In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in

  1. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  2. Measuring contact area in a sliding human finger-pad contact.

    Science.gov (United States)

    Liu, X; Carré, M J; Zhang, Q; Lu, Z; Matcher, S J; Lewis, R

    2018-02-01

    The work outlined in this paper was aimed at achieving further understanding of skin frictional behaviour by investigating the contact area between human finger-pads and flat surfaces. Both the static and the dynamic contact areas (in macro- and micro-scales) were measured using various techniques, including ink printing, optical coherence tomography (OCT) and Digital Image Correlation (DIC). In the studies of the static measurements using ink printing, the experimental results showed that the apparent and the real contact area increased with load following a piecewise linear correlation function for a finger-pad in contact with paper sheets. Comparisons indicated that the OCT method is a reliable and effective method to investigate the real contact area of a finger-pad and allow micro-scale analysis. The apparent contact area (from the DIC measurements) was found to reduce with time in the transition from the static phase to the dynamic phase while the real area of contact (from OCT) increased. The results from this study enable the interaction between finger-pads and contact object surface to be better analysed, and hence improve the understanding of skin friction. © 2017 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  3. An evaluation of 1-day disposable contact lens wear in a population of allergy sufferers.

    Science.gov (United States)

    Hayes, Valérie Y; Schnider, Cristina M; Veys, Jane

    2003-06-01

    This was a multi-site, 128-subject, bilateral crossover study to evaluate subjective comfort and slit-lamp findings with 1-day disposable contact lenses in a population of allergy sufferers during periods when allergen levels were elevated. The study involved 1-month of single-use daily wear with a 1-day disposable test lens (1. DAY ACUVUE Brand Contact Lenses, Johnson & Johnson Vision Care) and 1-month of daily wear with subjects' habitual lenses replaced to their usual replacement schedule. Pollen and mould counts were obtained for each site 1 week prior to the study and twice weekly throughout the study period. Subjective comfort and slit-lamp findings were recorded at baseline and after 1-month's wear of each modality. Sixty-seven percent of subjects agreed that the 1-day disposable lenses provided improved comfort when compared to the lenses they wore prior to the study, compared with 18% agreeing that the new pair of habitual lenses provided improved comfort. The 1-day disposable lenses showed greater improvement in slit-lamp findings from baseline than new habitual lenses. The use of 1-day disposable lenses is an effective strategy for managing allergy-suffering contact lens wearers.

  4. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicle driving schedules

    International Nuclear Information System (INIS)

    Cardoso, G.; Stadler, M.; Bozchalui, M.C.; Sharma, R.; Marnay, C.; Barbosa-Póvoa, A.; Ferrão, P.

    2014-01-01

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem. - Highlights: • This paper introduces a new EV aggregator model in the DER-CAM model and expands it with a stochastic formulation. • The model is used to analyze the impact of EVs in DER investment decisions in a large office building. • The uncertainty in EV driving patterns is considered through scenarios based on data from a daily commute driving survey. • Results indicate that EVs have a significant impact in optimal DER decisions, particularly when looking at short payback periods. • Furthermore, results indicate that uncertainty in EV driving schedules has little impact on DER investment decisions

  5. Formulation for less master production schedule instability under rolling horizon

    OpenAIRE

    Herrera , Carlos; Thomas , André

    2009-01-01

    International audience; In Manufacturing Planning and Control Systems, the Master Production Schedule (MPS) makes a link between tactical and operational levels, taking into account information provided by end items, demand forecast as well as Sales and Operations Planning (S&OP) suggestions. Therefore, MPS plays an important role to maintain an adequate customers service level and an efficient production system. In a rolling planning horizon, MPS is periodically computed over whole operation...

  6. A Catalog of 1022 Bright Contact Binary Stars

    Science.gov (United States)

    Gettel, S. J.; Geske, M. T.; McKay, T. A.

    2006-01-01

    In this work we describe a large new sample of contact binary stars extracted in a uniform manner from sky patrol data taken by the ROTSE-I telescope. Extensive ROTSE-I light-curve data are combined with J-, H-, and K-band near-infrared data taken from the Two Micron All Sky Survey to add color information. Contact binary candidates are selected using the observed period-color relation. Candidates are confirmed by visual examination of the light curves. To enhance the utility of this catalog, we derive a new J-H period-color-luminosity relation and use this to estimate distances for the entire catalog. From these distance estimates we derive an estimated contact binary space density of (1.7+/-0.6)×10-5 pc-3.

  7. Electric contact arcing

    International Nuclear Information System (INIS)

    Cuthrell, R.E.

    1976-01-01

    Electrical contacts must function properly in many types of components used in nuclear weapon systems. Design, application, and testing of these components require detailed knowledge of chemical and physical phenomena associated with stockpile storage, stockpile testing, and operation. In the past, investigation of these phenomena has led to significant discoveries on the effects of surface contaminants, friction and wear, and the mechanics of closure on contact performance. A recent investigation of contact arcing phenomena which revealed that, preceding contact closure, arcs may occur at voltages lower than had been previously known is described. This discovery is important, since arcing may damage contacts, and repetitive testing of contacts performed as part of a quality assurance program might produce cumulative damage that would yield misleading life-test data and could prevent proper operation of the contacts at some time in the future. This damage can be avoided by determining the conditions under which arcing occurs, and ensuring that these conditions are avoided in contact testing

  8. Designing of vague logic based multilevel feedback queue scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-03-01

    Full Text Available Multilevel feedback queue scheduler suffers from major issues of scheduling such as starvation for long tasks, fixed number of queues, and static length of time quantum in each queue. These factors directly affect the performance of the scheduler. At many times impreciseness exists in attributes of tasks which make the performance even worse. In this paper, our intent is to improve the performance by providing a solution to these issues. We design a multilevel feedback queue scheduler using a vague set which we call as VMLFQ scheduler. VMLFQ scheduler intelligently handles the impreciseness and defines the optimum number of queues as well as the optimal size of time quantum for each queue. It also resolves the problem of starvation. This paper simulates and analyzes the performance of VMLFQ scheduler with the other multilevel feedback queue techniques using MatLab.

  9. Trustable Virtual Machine Scheduling in a Cloud

    OpenAIRE

    Hermenier , Fabien; Henrio , Ludovic

    2017-01-01

    International audience; In an Infrastructure As A Service (IaaS) cloud, the scheduler deploys VMs to servers according to service level objectives (SLOs). Clients and service providers must both trust the infrastructure. In particular they must be sure that the VM scheduler takes decisions that are consistent with its advertised behaviour. The difficulties to master every theoretical and practical aspects of a VM scheduler implementation leads however to faulty behaviours that break SLOs and ...

  10. Management of Temporal Constraints for Factory Scheduling.

    Science.gov (United States)

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  11. Locality-Aware Task Scheduling and Data Distribution for OpenMP Programs on NUMA Systems and Manycore Processors

    Directory of Open Access Journals (Sweden)

    Ananya Muddukrishna

    2015-01-01

    Full Text Available Performance degradation due to nonuniform data access latencies has worsened on NUMA systems and can now be felt on-chip in manycore processors. Distributing data across NUMA nodes and manycore processor caches is necessary to reduce the impact of nonuniform latencies. However, techniques for distributing data are error-prone and fragile and require low-level architectural knowledge. Existing task scheduling policies favor quick load-balancing at the expense of locality and ignore NUMA node/manycore cache access latencies while scheduling. Locality-aware scheduling, in conjunction with or as a replacement for existing scheduling, is necessary to minimize NUMA effects and sustain performance. We present a data distribution and locality-aware scheduling technique for task-based OpenMP programs executing on NUMA systems and manycore processors. Our technique relieves the programmer from thinking of NUMA system/manycore processor architecture details by delegating data distribution to the runtime system and uses task data dependence information to guide the scheduling of OpenMP tasks to reduce data stall times. We demonstrate our technique on a four-socket AMD Opteron machine with eight NUMA nodes and on the TILEPro64 processor and identify that data distribution and locality-aware task scheduling improve performance up to 69% for scientific benchmarks compared to default policies and yet provide an architecture-oblivious approach for programmers.

  12. Optimal Sensor Networks Scheduling in Identification of Distributed Parameter Systems

    CERN Document Server

    Patan, Maciej

    2012-01-01

    Sensor networks have recently come into prominence because they hold the potential to revolutionize a wide spectrum of both civilian and military applications. An ingenious characteristic of sensor networks is the distributed nature of data acquisition. Therefore they seem to be ideally prepared for the task of monitoring processes with spatio-temporal dynamics which constitute one of most general and important classes of systems in modelling of the real-world phenomena. It is clear that careful deployment and activation of sensor nodes are critical for collecting the most valuable information from the observed environment. Optimal Sensor Network Scheduling in Identification of Distributed Parameter Systems discusses the characteristic features of the sensor scheduling problem, analyzes classical and recent approaches, and proposes a wide range of original solutions, especially dedicated for networks with mobile and scanning nodes. Both researchers and practitioners will find the case studies, the proposed al...

  13. 7 CFR 305.23 - Steam sterilization treatment schedules.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Steam sterilization treatment schedules. 305.23... Steam sterilization treatment schedules. Treatment schedule Temperature( °F) Pressure Exposure period (minutes) Directions T303-b-1 10 lbs 20 Use 28″ vacuum. Steam sterilization is not practical for treatment...

  14. 77 FR 33980 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2012-06-08

    ... 1703 Proposed FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice... the Board's proposed FOIA Fee Schedule Update published in the Federal Register of June 1, 2012. The...: The FOIA requires each Federal agency covered by the Act to specify a schedule of fees applicable to...

  15. Seamless personal health information system in cloud computing.

    Science.gov (United States)

    Chung, Wan-Young; Fong, Ee May

    2014-01-01

    Noncontact ECG measurement has gained popularity these days due to its noninvasive and conveniences to be applied on daily life. This approach does not require any direct contact between patient's skin and sensor for physiological signal measurement. The noncontact ECG measurement is integrated with mobile healthcare system for health status monitoring. Mobile phone acts as the personal health information system displaying health status and body mass index (BMI) tracking. Besides that, it plays an important role being the medical guidance providing medical knowledge database including symptom checker and health fitness guidance. At the same time, the system also features some unique medical functions that cater to the living demand of the patients or users, including regular medication reminders, alert alarm, medical guidance, appointment scheduling. Lastly, we demonstrate mobile healthcare system with web application for extended uses, thus health data are clouded into web server system and web database storage. This allows remote health status monitoring easily and so forth it promotes a cost effective personal healthcare system.

  16. Distributed late-binding micro-scheduling and data caching for data-intensive workflows

    International Nuclear Information System (INIS)

    Delgado Peris, A.

    2015-01-01

    Today's world is flooded with vast amounts of digital information coming from innumerable sources. Moreover, it seems clear that this trend will only intensify in the future. Industry, society and remarkably science are not indifferent to this fact. On the contrary, they are struggling to get the most out of this data, which means that they need to capture, transfer, store and process it in a timely and efficient manner, using a wide range of computational resources. And this task is not always simple. A very representative example of the challenges posed by the management and processing of large quantities of data is that of the Large Hadron Collider experiments, which handle tens of petabytes of physics information every year. Based on the experience of one of these collaborations, we have studied the main issues involved in the management of huge volumes of data and in the completion of sizeable workflows that consume it. In this context, we have developed a general-purpose architecture for the scheduling and execution of workflows with heavy data requirements: the Task Queue. This new system builds on the late-binding overlay model, which has helped experiments to successfully overcome the problems associated to the heterogeneity and complexity of large computational grids. Our proposal introduces several enhancements to the existing systems. The execution agents of the Task Queue architecture share a Distributed Hash Table (DHT) and perform job matching and assignment cooperatively. In this way, scalability problems of centralized matching algorithms are avoided and workflow execution times are improved. Scalability makes fine-grained micro-scheduling possible and enables new functionalities, like the implementation of a distributed data cache on the execution nodes and the integration of data location information in the scheduling decisions...(Author)

  17. Residency Applicants Prefer Online System for Scheduling Interviews

    Directory of Open Access Journals (Sweden)

    Wills, Charlotte

    2015-03-01

    Full Text Available Introduction: Residency coordinators may be overwhelmed when scheduling residency interviews. Applicants often have to coordinate interviews with multiple programs at once, and relying on verbal or email confirmation may delay the process. Our objective was to determine applicant mean time to schedule and satisfaction using online scheduling. Methods: This pilot study is a retrospective analysis performed on a sample of applicants offered interviews at an urban county emergency medicine residency. Applicants were asked their estimated time to schedule with the online system compared to their average time using other methods. In addition, they were asked on a five-point anchored scale to rate their satisfaction. Results: Of 171 applicants, 121 completed the survey (70.8%. Applicants were scheduling an average of 13.3 interviews. Applicants reported scheduling interviews using the online system in mean of 46.2 minutes (median 10, range 1-1800 from the interview offer as compared with a mean of 320.2 minutes (median 60, range 3-2880 for other programs not using this system. This difference was statistically significant. In addition, applicants were more likely to rate their satisfaction using the online system as “satisfied” (83.5% vs 16.5%. Applicants were also more likely to state that they preferred scheduling their interviews using the online system rather than the way other programs scheduled interviews (74.2% vs 4.1% and that the online system aided them coordinating travel arrangements (52.1% vs 4.1%. Conclusion: An online interview scheduling system is associated with higher satisfaction among applicants both in coordinating travel arrangements and in overall satisfaction. [West J Emerg Med. 2015;16(2:352-354.

  18. A dynamic approach to vehicle scheduling

    NARCIS (Netherlands)

    D. Huisman (Dennis); R. Freling (Richard); A.P.M. Wagelmans (Albert)

    2001-01-01

    textabstractThis paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our

  19. 21 CFR 1308.13 - Schedule III.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III. 1308.13 Section 1308.13 Food and... opposite it. (b) Stimulants. Unless specifically excepted or unless listed in another schedule, any... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical...

  20. 29 CFR 825.202 - Intermittent leave or reduced leave schedule.

    Science.gov (United States)

    2010-07-01

    ... leave schedule is a leave schedule that reduces an employee's usual number of working hours per workweek, or hours per workday. A reduced leave schedule is a change in the employee's schedule for a period of... 29 Labor 3 2010-07-01 2010-07-01 false Intermittent leave or reduced leave schedule. 825.202...

  1. Real-Time Forecasting of EV Charging Station Scheduling for Smart Energy Systems

    Directory of Open Access Journals (Sweden)

    Bharatiraja Chokkalingam

    2017-03-01

    Full Text Available The enormous growth in the penetration of electric vehicles (EVs, has laid the path to advancements in the charging infrastructure. Connectivity between charging stations is an essential prerequisite for future EV adoption to alleviate user’s “range anxiety”. The existing charging stations fail to adopt power provision, allocation and scheduling management. To improve the existing charging infrastructure, data based on real-time information and availability of reserves at charging stations could be uploaded to the users to help them locate the nearest charging station for an EV. This research article focuses on an a interactive user application developed through SQL and PHP platform to allocate the charging slots based on estimated battery parameters, which uses data communication with charging stations to receive the slot availability information. The proposed server-based real-time forecast charging infrastructure avoids waiting times and its scheduling management efficiently prevents the EV from halting on the road due to battery drain out. The proposed model is implemented using a low-cost microcontroller and the system etiquette tested.

  2. Sandia National Laboratories: News: Media Resources: Media Contacts

    Science.gov (United States)

    Foundations Bioscience Computing & Information Science Electromagnetics Engineering Science Geoscience computing, modeling and simulation and nanotechnology. Contact: (505) 845-7078; nsinger@sandia.gov Kristen specialist at Sandia/California. She covers biological and engineering sciences, homeland security and

  3. A cost/schedule and control system for the environmental restoration program Albuquerque Field Office

    International Nuclear Information System (INIS)

    Fiske, Wanda S.; Bischoff, Edward L.; Rea, Kenneth H.; Dwain Farley, P.; Biedermann, Charles A.

    1992-01-01

    The Department of Energy (DOE) Field Office Albuquerque (AL), Environmental Restoration Project Office (ERPO), has developed a project management system used to plan, document, and control Environmental Restoration (ER) work at eight installations and one superfund site managed by AL. This system emphasizes control of the cost, schedule, and technical elements of the Program. It supports programmatic documentation such as the Environmental Restoration/Waste Management Five-Year Plan, Site Specific Plan, and budget requests. The System provides information used to manage the ER Program at all levels of management (i.e., from low-level day-to-day activities to high-level upper management). The System requires substantial effort to ensure reliability; however, the benefit to ERPO is an effective, proactive project management tool. This paper provides an overview of the ERPO System, an explanation of how it is implemented, and lessons learned from this process. Application of the System to cost estimating, annual and five-year budget preparation, resource projections, scheduling, and cost/schedule performance measurement is discussed. Also discussed are cost/schedule review procedures, along with variance identification and resolution. Examples are taken from the Pinellas ER Program. (author)

  4. Optimal Temporal Decoupling in Task Scheduling with Preferences

    NARCIS (Netherlands)

    Endhoven, L.; Klos, T.B.; Witteveen, C.

    2011-01-01

    Multi-agent planning and scheduling concerns finding a joint plan to achieve some set of common goals with several independent agents each aiming to find a plan or schedule for their part of the goals. To avoid conflicts in these individual plans or schedules decoupling is used. Such a decoupling

  5. Effect of contact lens use on Computer Vision Syndrome.

    Science.gov (United States)

    Tauste, Ana; Ronda, Elena; Molina, María-José; Seguí, Mar

    2016-03-01

    To analyse the relationship between Computer Vision Syndrome (CVS) in computer workers and contact lens use, according to lens materials. Cross-sectional study. The study included 426 civil-service office workers, of whom 22% were contact lens wearers. Workers completed the Computer Vision Syndrome Questionnaire (CVS-Q) and provided information on their contact lenses and exposure to video display terminals (VDT) at work. CVS was defined as a CVS-Q score of 6 or more. The covariates were age and sex. Logistic regression was used to calculate the association (crude and adjusted for age and sex) between CVS and individual and work-related factors, and between CVS and contact lens type. Contact lens wearers are more likely to suffer CVS than non-lens wearers, with a prevalence of 65% vs 50%. Workers who wear contact lenses and are exposed to the computer for more than 6 h day(-1) are more likely to suffer CVS than non-lens wearers working at the computer for the same amount of time (aOR = 4.85; 95% CI, 1.25-18.80; p = 0.02). Regular contact lens use increases CVS after 6 h of computer work. © 2016 The Authors Ophthalmic & Physiological Optics © 2016 The College of Optometrists.

  6. Request-Driven Schedule Automation for the Deep Space Network

    Science.gov (United States)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol

    2010-01-01

    The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

  7. PLAN-IT - Scheduling assistant for solar system exploration

    International Nuclear Information System (INIS)

    Dias, W. C.; Henricks, J. A.; Wong, J. C.; California Institute of Technology, Pasadena)

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered. 13 references

  8. Sensing with Superconducting Point Contacts

    Directory of Open Access Journals (Sweden)

    Argo Nurbawono

    2012-05-01

    Full Text Available Superconducting point contacts have been used for measuring magnetic polarizations, identifying magnetic impurities, electronic structures, and even the vibrational modes of small molecules. Due to intrinsically small energy scale in the subgap structures of the supercurrent determined by the size of the superconducting energy gap, superconductors provide ultrahigh sensitivities for high resolution spectroscopies. The so-called Andreev reflection process between normal metal and superconductor carries complex and rich information which can be utilized as powerful sensor when fully exploited. In this review, we would discuss recent experimental and theoretical developments in the supercurrent transport through superconducting point contacts and their relevance to sensing applications, and we would highlight their current issues and potentials. A true utilization of the method based on Andreev reflection analysis opens up possibilities for a new class of ultrasensitive sensors.

  9. Management Matters. Changing to Flexible Scheduling

    Science.gov (United States)

    Pappas, Marjorie L.

    2005-01-01

    Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…

  10. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  11. 75 FR 47503 - Schedules of Controlled Substances; Placement of 2,5-Dimethoxy-4-(n)-propylthiophenethylamine and...

    Science.gov (United States)

    2010-08-06

    ... scientific background information, comparisons of potency differences are only one piece of background... the CSA. Even though the scheduling of BZP was finalized more than six years ago, DEA has been advised...

  12. Measuring contact angle and meniscus shape with a reflected laser beam.

    Science.gov (United States)

    Eibach, T F; Fell, D; Nguyen, H; Butt, H J; Auernhammer, G K

    2014-01-01

    Side-view imaging of the contact angle between an extended planar solid surface and a liquid is problematic. Even when aligning the view perfectly parallel to the contact line, focusing one point of the contact line is not possible. We describe a new measurement technique for determining contact angles with the reflection of a widened laser sheet on a moving contact line. We verified this new technique measuring the contact angle on a cylinder, rotating partially immersed in a liquid. A laser sheet is inclined under an angle φ to the unperturbed liquid surface and is reflected off the meniscus. Collected on a screen, the reflection image contains information to determine the contact angle. When dividing the laser sheet into an array of laser rays by placing a mesh into the beam path, the shape of the meniscus can be reconstructed from the reflection image. We verified the method by measuring the receding contact angle versus speed for aqueous cetyltrimethyl ammonium bromide solutions on a smooth hydrophobized as well as on a rough polystyrene surface.

  13. A fast method for the unit scheduling problem with significant renewable power generation

    International Nuclear Information System (INIS)

    Osório, G.J.; Lujano-Rojas, J.M.; Matias, J.C.O.; Catalão, J.P.S.

    2015-01-01

    Highlights: • A model to the scheduling of power systems with significant renewable power generation is provided. • A new methodology that takes information from the analysis of each scenario separately is proposed. • Based on a probabilistic analysis, unit scheduling and corresponding economic dispatch are estimated. • A comparison with others methodologies is in favour of the proposed approach. - Abstract: Optimal operation of power systems with high integration of renewable power sources has become difficult as a consequence of the random nature of some sources like wind energy and photovoltaic energy. Nowadays, this problem is solved using Monte Carlo Simulation (MCS) approach, which allows considering important statistical characteristics of wind and solar power production such as the correlation between consecutive observations, the diurnal profile of the forecasted power production, and the forecasting error. However, MCS method requires the analysis of a representative amount of trials, which is an intensive calculation task that increases considerably with the number of scenarios considered. In this paper, a model to the scheduling of power systems with significant renewable power generation based on scenario generation/reduction method, which establishes a proportional relationship between the number of scenarios and the computational time required to analyse them, is proposed. The methodology takes information from the analysis of each scenario separately to determine the probabilistic behaviour of each generator at each hour in the scheduling problem. Then, considering a determined significance level, the units to be committed are selected and the load dispatch is determined. The proposed technique was illustrated through a case study and the comparison with stochastic programming approach was carried out, concluding that the proposed methodology can provide an acceptable solution in a reduced computational time

  14. Allergic Contact Dermatitis

    Directory of Open Access Journals (Sweden)

    Meltem Önder

    2009-03-01

    Full Text Available Allergic contact dermatitis is the delayed type hypersensitivity reaction to exogenous agents. Allergic contact dermatitis may clinically present acutely after allergen exposure and initial sensitization in a previously sensitized individual. Acute phase is characterized by erythematous, scaly plaques. In severe cases vesiculation and bullae in exposed areas are very characteristic. Repeated or continuous exposure of sensitized individual with allergen result in chronic dermatitis. Lichenification, erythematous plaques, hyperkeratosis and fissuring may develop in chronic patients. Allergic contact dermatitis is very common dermatologic problem in dermatology daily practice. A diagnosis of contact dermatitis requires the careful consideration of patient history, physical examination and patch testing. The knowledge of the clinical features of the skin reactions to various contactans is important to make a correct diagnosis of contact dermatitis. It can be seen in every age, in children textile product, accessories and touch products are common allergens, while in adults allergic contact dermatitis may be related with topical medicaments. The contact pattern of contact dermatitis depends on fashion and local traditions as well. The localization of allergic reaction should be evaluated and patients’ occupation and hobbies should be asked. The purpose of this review is to introduce to our collaques up dated allergic contact dermatitis literatures both in Turkey and in the World.

  15. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  16. The integration of audio-tactile information is modulated by multimodal social interaction with physical contact in infancy.

    Science.gov (United States)

    Tanaka, Yukari; Kanakogi, Yasuhiro; Kawasaki, Masahiro; Myowa, Masako

    2018-04-01

    Interaction between caregivers and infants is multimodal in nature. To react interactively and smoothly to such multimodal signals, infants must integrate all these signals. However, few empirical infant studies have investigated how multimodal social interaction with physical contact facilitates multimodal integration, especially regarding audio - tactile (A-T) information. By using electroencephalogram (EEG) and event-related potentials (ERPs), the present study investigated how neural processing involved in A-T integration is modulated by tactile interaction. Seven- to 8-months-old infants heard one pseudoword both whilst being tickled (multimodal 'A-T' condition), and not being tickled (unimodal 'A' condition). Thereafter, their EEG was measured during the perception of the same words. Compared to the A condition, the A-T condition resulted in enhanced ERPs and higher beta-band activity within the left temporal regions, indicating neural processing of A-T integration. Additionally, theta-band activity within the middle frontal region was enhanced, which may reflect enhanced attention to social information. Furthermore, differential ERPs correlated with the degree of engagement in the tickling interaction. We provide neural evidence that the integration of A-T information in infants' brains is facilitated through tactile interaction with others. Such plastic changes in neural processing may promote harmonious social interaction and effective learning in infancy. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  17. The integration of audio−tactile information is modulated by multimodal social interaction with physical contact in infancy

    Directory of Open Access Journals (Sweden)

    Yukari Tanaka

    2018-04-01

    Full Text Available Interaction between caregivers and infants is multimodal in nature. To react interactively and smoothly to such multimodal signals, infants must integrate all these signals. However, few empirical infant studies have investigated how multimodal social interaction with physical contact facilitates multimodal integration, especially regarding audio − tactile (A-T information. By using electroencephalogram (EEG and event-related potentials (ERPs, the present study investigated how neural processing involved in A-T integration is modulated by tactile interaction. Seven- to 8-months-old infants heard one pseudoword both whilst being tickled (multimodal ‘A-T’ condition, and not being tickled (unimodal ‘A’ condition. Thereafter, their EEG was measured during the perception of the same words. Compared to the A condition, the A-T condition resulted in enhanced ERPs and higher beta-band activity within the left temporal regions, indicating neural processing of A-T integration. Additionally, theta-band activity within the middle frontal region was enhanced, which may reflect enhanced attention to social information. Furthermore, differential ERPs correlated with the degree of engagement in the tickling interaction. We provide neural evidence that the integration of A-T information in infants’ brains is facilitated through tactile interaction with others. Such plastic changes in neural processing may promote harmonious social interaction and effective learning in infancy. Keywords: Electroencephalogram (EEG, Infants, Multisensory integration, Touch interaction

  18. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  19. Method and apparatus for scheduling broadcasts in social networks

    KAUST Repository

    Manzoor, Emaad Ahmed

    2016-08-25

    A method, apparatus, and computer readable medium are provided for maximizing consumption of broadcasts by a producer. An example method includes receiving selection of a total number of time slots to use for scheduling broadcasts, and receiving information regarding the producer\\'s followers. The example method further 5 includes identifying, by a processor and based on the received information, discount factors associated with the producer\\'s followers, and calculating, by the processor and based on the received information, a predicted number of competitor broadcasts during each time slot of the total number of time slots. Finally, the example method includes determining, by the processor and based on the discount factors and the predicted 10 number of competitor broadcasts during each time slot, a number of broadcasts for the producer to transmit in each time slot of the total number of time slots.

  20. Parental work schedules and child overweight and obesity.

    Science.gov (United States)

    Champion, S L; Rumbold, A R; Steele, E J; Giles, L C; Davies, M J; Moore, V M

    2012-04-01

    Studies in school-age children have consistently shown a positive association between maternal paid work hours and child obesity. However, there is conflicting evidence about the impact of maternal work hours scheduled at nonstandard times (for example, evenings, nights or weekends), and no previous examination of paternal work schedules and child weight. We examined the associations between maternal, paternal and combined parental paid work schedules and overweight/obesity in children at age 9 years. Data were analysed from the most recent follow-up of 9-year-old children (n=434) in an Australian birth cohort study. Children were measured and classified as overweight/obese using the International Obesity Taskforce body mass index cutoff points. Current working conditions of parents were obtained from a structured interview with the primary caregiver. Logistic regression analyses were used to investigate the effect of parental work schedules on child overweight/obesity with adjustment for a range of sociodemographic and household factors associated with parental employment and child weight. At 9 years of age, 99 children (22.8%) were overweight or obese. When parental work schedules were examined separately, child overweight/obesity was significantly associated with paternal nonstandard work schedules (adjusted odds ratio (OR) 1.97, 95% confidence interval (CI) 1.08-3.61). There was no association with any type of maternal work schedule. We also found an association between child overweight/obesity and circumstances in which both parents worked nonstandard schedules; however, this was of borderline statistical significance in the adjusted models (adjusted OR 2.26, 95% CI 0.99-5.16). Work hours scheduled at nonstandard times, when worked by the father or both parents, were associated with child overweight and obesity. These findings indicate the potential importance of fathers' paid work arrangements for child overweight/obesity, which until recently has largely