WorldWideScience

Sample records for schedule prevailing rate

  1. 77 FR 34854 - Prevailing Rate Systems; Special Wage Schedules for Nonappropriated Fund Automotive Mechanics

    Science.gov (United States)

    2012-06-12

    ... hours required to complete a particular job. Since the change would de-link shop labor rates from..., and job-grading standards for uniform application by all Federal agencies. While most FWS employees... percentage of sales. Under the current commission pay plan, management controls the shop labor rate and...

  2. Federal Prevailing Rate Advisory Committee (FPRAC) Annual Reports

    Data.gov (United States)

    Office of Personnel Management — Annual reports of the Federal Prevailing Rate Advisory Committee (FPRAC), which studies the prevailing (market) rate system for wages and other matters pertinent to...

  3. 29 CFR 525.10 - Prevailing wage rates.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Prevailing wage rates. 525.10 Section 525.10 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS EMPLOYMENT OF WORKERS WITH DISABILITIES UNDER SPECIAL CERTIFICATES § 525.10 Prevailing wage rates. (a) A...

  4. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  5. 78 FR 29657 - Prevailing Rate Systems; Definition of Vanderburgh County, Indiana, to a Nonappropriated Fund...

    Science.gov (United States)

    2013-05-21

    ...-AM82 Prevailing Rate Systems; Definition of Vanderburgh County, Indiana, to a Nonappropriated Fund... County, IN; and Jefferson and Pulaski Counties, MO. The Federal Prevailing Rate Advisory Committee, the... as follows: [[Page 29658

  6. 76 FR 9694 - Prevailing Rate Systems; Redefinition of the Northeastern Arizona and Colorado Appropriated Fund...

    Science.gov (United States)

    2011-02-22

    ... 3206-AM33 Prevailing Rate Systems; Redefinition of the Northeastern Arizona and Colorado Appropriated... changes are based on recent consensus recommendations of the Federal Prevailing Rate Advisory Committee to... Northeastern Arizona wage area. The Federal Prevailing Rate Advisory Committee (FPRAC), the national labor...

  7. 76 FR 70321 - Prevailing Rate Systems; Redefinition of the Northern Mississippi and Memphis, TN, Appropriated...

    Science.gov (United States)

    2011-11-14

    ... OFFICE OF PERSONNEL MANAGEMENT 5 CFR Part 532 RIN 3206-AM37 Prevailing Rate Systems; Redefinition... on a consensus recommendation of the Federal Prevailing Rate Advisory Committee (FPRAC) to best match... which OPM received no comments. The Federal Prevailing Rate Advisory Committee (FPRAC), the national...

  8. 78 FR 60182 - Prevailing Rate Systems; Definition of Broward County, Florida, to a Nonappropriated Fund Federal...

    Science.gov (United States)

    2013-10-01

    ... OFFICE OF PERSONNEL MANAGEMENT 5 CFR Part 532 RIN 3206-AM83 Prevailing Rate Systems; Definition of... wage area. The Federal Prevailing Rate Advisory Committee, the national labor-management committee... follows: PART 532--PREVAILING RATE SYSTEMS 0 1. The authority citation for part 532 continues to read as...

  9. 78 FR 18252 - Prevailing Rate Systems; North American Industry Classification System Based Federal Wage System...

    Science.gov (United States)

    2013-03-26

    ...-AM78 Prevailing Rate Systems; North American Industry Classification System Based Federal Wage System... applicable sections. The Federal Prevailing Rate Advisory Committee, the national labor- management committee... proposing to amend 5 CFR part 532 as follows: PART 532--PREVAILING RATE SYSTEMS 0 1. The authority citation...

  10. 76 FR 12769 - Federal Prevailing Rate Advisory Committee; Cancellation of Upcoming Meeting

    Science.gov (United States)

    2011-03-08

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Prevailing Rate Advisory Committee; Cancellation of... Prevailing Rate Advisory Committee is issuing this notice to cancel the March 17, 2011, public meeting..., Chairman, Federal Prevailing Rate Advisory Committee. [FR Doc. 2011-5266 Filed 3-7-11; 8:45 am] BILLING...

  11. 78 FR 41962 - Federal Prevailing Rate Advisory Committee; Cancellation of Upcoming Meeting

    Science.gov (United States)

    2013-07-12

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Prevailing Rate Advisory Committee; Cancellation of... Prevailing Rate Advisory Committee is issuing this notice to cancel the July 18, 2013, public meeting... Prevailing Rate Advisory Committee. [FR Doc. 2013-16763 Filed 7-11-13; 8:45 am] BILLING CODE 6325-49-P ...

  12. 78 FR 20359 - Federal Prevailing Rate Advisory Committee; Cancellation of Upcoming Meeting

    Science.gov (United States)

    2013-04-04

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Prevailing Rate Advisory Committee; Cancellation of... Prevailing Rate Advisory Committee is issuing this notice to cancel the April 18, 2013, public meeting... Officer, Federal Prevailing Rate Advisory Committee. [FR Doc. 2013-07875 Filed 4-3-13; 8:45 am] BILLING...

  13. 75 FR 58339 - Prevailing Rate Systems; Redefinition of the Shreveport, LA; Texarkana, TX; Milwaukee, WI; and...

    Science.gov (United States)

    2010-09-24

    ... 3206-AM28 Prevailing Rate Systems; Redefinition of the Shreveport, LA; Texarkana, TX; Milwaukee, WI... area. These changes are based on recent consensus recommendations of the Federal Prevailing Rate... below. The Federal Prevailing Rate Advisory Committee (FPRAC), the national labor-management committee...

  14. 77 FR 28640 - Federal Prevailing Rate Advisory Committee; Cancellation of Upcoming Meeting

    Science.gov (United States)

    2012-05-15

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Prevailing Rate Advisory Committee; Cancellation of... Prevailing Rate Advisory Committee is issuing this notice to cancel the May 24, 2012, public meeting..., Federal Prevailing Rate Advisory Committee. [FR Doc. 2012-11728 Filed 5-14-12; 8:45 am] BILLING CODE 6325...

  15. 76 FR 31885 - Prevailing Rate Systems; Redefinition of the Northern Mississippi and Memphis, TN, Appropriated...

    Science.gov (United States)

    2011-06-02

    ... OFFICE OF PERSONNEL MANAGEMENT 5 CFR Part 532 RIN 3206-AM37 Prevailing Rate Systems; Redefinition... Prevailing Rate Advisory Committee (FPRAC) to best match the county proposed for redefinition to a nearby FWS... Memphis wage area. The Federal Prevailing Rate Advisory Committee (FPRAC), the national labor-management...

  16. 78 FR 29658 - Prevailing Rate Systems; Definition of Broward County, Florida, to a Nonappropriated Fund Federal...

    Science.gov (United States)

    2013-05-21

    ... OFFICE OF PERSONNEL MANAGEMENT 5 CFR Part 532 RIN 3206-AM83 Prevailing Rate Systems; Definition of... and Palm Beach Counties, FL. The Federal Prevailing Rate Advisory Committee, the national labor... 532--PREVAILING RATE SYSTEMS 0 1. The authority citation for part 532 continues to read as follows...

  17. 75 FR 34182 - Federal Prevailing Rate Advisory Committee; Cancellation of Upcoming Meeting

    Science.gov (United States)

    2010-06-16

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Prevailing Rate Advisory Committee; Cancellation of... Prevailing Rate Advisory Committee is issuing this notice to cancel the June 17, 2010, public [email protected] ; or FAX: (202) 606-4264. Sheldon Friedman, Chairman, Federal Prevailing Rate...

  18. 76 FR 70512 - Federal Prevailing Rate Advisory Committee; Cancellation of Upcoming Meeting

    Science.gov (United States)

    2011-11-14

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Prevailing Rate Advisory Committee; Cancellation of... Prevailing Rate Advisory Committee is issuing this notice to cancel the November 17, 2011, public meeting..., Chairman, Federal Prevailing Rate Advisory Committee. [FR Doc. 2011-29274 Filed 11-10-11; 8:45 am] BILLING...

  19. 48 CFR 22.1002-2 - Wage determinations based on prevailing rates.

    Science.gov (United States)

    2010-10-01

    ... on prevailing rates. 22.1002-2 Section 22.1002-2 Federal Acquisition Regulations System FEDERAL... Contract Act of 1965, as Amended 22.1002-2 Wage determinations based on prevailing rates. Contractors... Department of Labor to prevail in the locality or, in the absence of a wage determination, the minimum wage...

  20. 76 FR 9640 - Prevailing Rate Systems: Santa Clara, CA, Tulsa County, OK, and Angelina County, TX

    Science.gov (United States)

    2011-02-22

    ... OFFICE OF PERSONNEL MANAGEMENT 5 CFR Part 532 RIN 3206-AM22 Prevailing Rate Systems: Santa Clara... County, Texas, as an area of application to the Dallas, TX, NAF FWS wage area. The Federal Prevailing.... Accordingly, the U.S. Office of Personnel Management amends 5 CFR part 532 as follows: PART 532--PREVAILING...

  1. 78 FR 60181 - Prevailing Rate Systems; Redefinition of the Clayton-Cobb-Fulton, Georgia, Nonappropriated Fund...

    Science.gov (United States)

    2013-10-01

    ... OFFICE OF PERSONNEL MANAGEMENT 5 CFR Part 532 RIN 3206-AM84 Prevailing Rate Systems; Redefinition of the Clayton-Cobb-Fulton, Georgia, Nonappropriated Fund Federal Wage System Wage Area AGENCY: U.S... Counties). The Federal Prevailing Rate Advisory Committee, the national labor-management committee...

  2. 75 FR 18552 - Federal Prevailing Rate Advisory Committee; Open Committee Meetings

    Science.gov (United States)

    2010-04-12

    ... of Personnel Management Building, 1900 E Street, NW., Washington, DC. The Federal Prevailing Rate... business. Therefore, these caucuses will be closed to the public because of a determination made by the..., Federal Prevailing Rate Advisory Committee, Room 5H27, 1900 E Street, NW., Washington, DC 20415, (202) 606...

  3. 5 CFR 532.205 - The use of Federal, State, and local minimum wage requirements in determining prevailing rates.

    Science.gov (United States)

    2010-01-01

    ... minimum wage requirements in determining prevailing rates. 532.205 Section 532.205 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PREVAILING RATE SYSTEMS Prevailing Rate Determinations § 532.205 The use of Federal, State, and local minimum wage requirements in determining prevailing...

  4. 76 FR 70365 - Prevailing Rate Systems; Redefinition of the Austin, TX and Waco, TX, Appropriated Fund Federal...

    Science.gov (United States)

    2011-11-14

    ... 3206-AM50 Prevailing Rate Systems; Redefinition of the Austin, TX and Waco, TX, Appropriated Fund... the Federal Prevailing Rate Advisory Committee to best match the counties proposed for redefinition to... Prevailing Rate Advisory Committee (FPRAC), the national labor-management committee responsible for advising...

  5. 75 FR 39460 - Prevailing Rate Systems; Redefinition of the Chicago, IL; Fort Wayne-Marion, IN; Indianapolis, IN...

    Science.gov (United States)

    2010-07-09

    ...-AM21 Prevailing Rate Systems; Redefinition of the Chicago, IL; Fort Wayne-Marion, IN; Indianapolis, IN... wage area. These changes are based on recent consensus recommendations of the Federal Prevailing Rate... below. The Federal Prevailing Rate Advisory Committee (FPRAC), the national labor-management committee...

  6. 76 FR 14679 - Prevailing Wage Rates for Construction Occupations on Guam for Purposes of the H-2B Temporary...

    Science.gov (United States)

    2011-03-17

    ...)(v)(E) and (F). If the prevailing wage rate is too low, available U.S. workers may be dissuaded from... Docket No. USCIS-2010-0006] RIN 1615-ZA98 Prevailing Wage Rates for Construction Occupations on Guam for... the public on the system that the Governor of Guam is using to determine prevailing wage rates for...

  7. 77 FR 68073 - Prevailing Rate Systems; Redefinition of the St. Louis, MO; Southern Missouri; Cleveland, OH; and...

    Science.gov (United States)

    2012-11-15

    ... 3206-AM70 Prevailing Rate Systems; Redefinition of the St. Louis, MO; Southern Missouri; Cleveland, OH... Cleveland wage area. These changes are based on recent consensus recommendations of the Federal Prevailing... proposing the changes described below. The Federal Prevailing Rate Advisory Committee (FPRAC), the national...

  8. 75 FR 75706 - Federal Prevailing Rate Advisory Committee; Open Committee Meetings

    Science.gov (United States)

    2010-12-06

    ... Building, 1900 E Street, NW., Washington, DC. The Federal Prevailing Rate Advisory Committee is composed of... considered and would disrupt substantially the disposition of its business. Therefore, these caucuses will be... 5H27, 1900 E Street, NW., Washington, DC 20415, (202) 606-9400. U.S. Office of Personnel Management...

  9. 78 FR 70599 - Federal Prevailing Rate Advisory Committee; Open Committee Meetings

    Science.gov (United States)

    2013-11-26

    ... of Personnel Management Building, 1900 E Street NW., Washington, DC. The Federal Prevailing Rate... the matters being considered and would disrupt substantially the disposition of its business... Advisory Committee, Room 5H27, 1900 E Street NW., Washington, DC 20415, (202) 606-9400. U.S. Office of...

  10. 76 FR 75567 - Federal Prevailing Rate Advisory Committee; Open Committee Meetings

    Science.gov (United States)

    2011-12-02

    ..., 1900 E Street, NW., Washington, DC. The Federal Prevailing Rate Advisory Committee is composed of a... disrupt substantially the disposition of its business. Therefore, these caucuses will be closed to the... 5H27, 1900 E Street, NW., Washington, DC 20415, (202) 606-9400. U.S. Office of Personnel Management...

  11. 77 FR 8926 - Federal Prevailing Rate Advisory Committee; Open Committee Meetings

    Science.gov (United States)

    2012-02-15

    ... Personnel Management Building, 1900 E Street NW., Washington, DC. The Federal Prevailing Rate Advisory... considered and would disrupt substantially the disposition of its business. Therefore, these caucuses will be... 5H27, 1900 E Street NW., Washington, DC 20415, (202) 606-9400. U.S. Office of Personnel Management...

  12. 77 FR 76304 - Federal Prevailing Rate Advisory Committee; Open Committee Meetings

    Science.gov (United States)

    2012-12-27

    ... 5A06A, U.S. Office of Personnel Management Building, 1900 E Street NW., Washington, DC. The Federal... the matters being considered and would disrupt substantially the disposition of its business... Management, Federal Prevailing Rate Advisory Committee, Room 5H27, 1900 E Street NW., Washington, DC 20415...

  13. Schedule for Rating Disabilities; the Endocrine System. Final rule.

    Science.gov (United States)

    2017-11-02

    This document amends the Department of Veterans Affairs (VA) Schedule for Rating Disabilities (VASRD) by revising the portion of the Schedule that addresses endocrine conditions and disorders of the endocrine system. The effect of this action is to ensure that the VASRD uses current medical terminology and to provide detailed and updated criteria for evaluation of endocrine disorders.

  14. 76 FR 39159 - Schedule for Rating Disabilities; The Digestive System

    Science.gov (United States)

    2011-07-05

    ... of this change is to incorporate medical advances that have occurred since the last review, insert current medical terminology, and provide clear criteria. DATES: Comments must be received by VA on or... the rating schedule, and implement current medical criteria and terminology that reflect recent...

  15. 5 CFR 532.207 - Time schedule for wage surveys.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Time schedule for wage surveys. 532.207... PREVAILING RATE SYSTEMS Prevailing Rate Determinations § 532.207 Time schedule for wage surveys. (a) Wage... and the collection of wage data by visits to establishments. (c) A wage-change survey shall be made...

  16. Pulsed dose rate and fractionated high dose rate brachytherapy: choice of brachytherapy schedules to replace low dose rate treatments

    International Nuclear Information System (INIS)

    Visser, Andries G.; Aardweg, Gerard J.M.J. van den; Levendag, Peter C.

    1996-01-01

    Purpose: Pulsed dose rate (PDR) brachytherapy is a new type of afterloading brachytherapy (BT) in which a continuous low dose rate (LDR) treatment is simulated by a series of 'pulses,' i.e., fractions of short duration (less than 0.5 h) with intervals between fractions of 1 to a few hours. At the Dr. Daniel den Hoed Cancer Center, the term 'PDR brachytherapy' is used for treatment schedules with a large number of fractions (at least four per day), while the term 'fractionated high dose rate (HDR) brachytherapy' is used for treatment schedules with just one or two brachytherapy fractions per day. Both treatments can be applied as alternatives for LDR BT. This article deals with the choice between PDR and fractionated HDR schedules and proposes possible fractionation schedules. Methods and Materials: To calculate HDR and PDR fractionation schedules with the intention of being equivalent to LDR BT, the linear-quadratic (LQ) model has been used in an incomplete repair formulation as given by Brenner and Hall, and by Thames. In contrast to earlier applications of this model, both the total physical dose and the overall time were not kept identical for LDR and HDR/PDR schedules. A range of possible PDR treatment schedules is presented, both for booster applications (in combination with external radiotherapy (ERT) and for BT applications as a single treatment. Because the knowledge of both α/β values and the half time for repair of sublethal damage (T (1(2)) ), which are required for these calculations, is quite limited, calculations regarding the equivalence of LDR and PDR treatments have been performed for a wide range of values of α/β and T (1(2)) . The results are presented graphically as PDR/LDR dose ratios and as ratios of the PDR/LDR tumor control probabilities. Results: If the condition that total physical dose and overall time of a PDR treatment must be exactly identical to the values for the corresponding LDR treatment regimen is not applied, there appears

  17. 38 CFR 4.104 - Schedule of ratings-cardiovascular system.

    Science.gov (United States)

    2010-07-01

    ...-cardiovascular system. 4.104 Section 4.104 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS SCHEDULE FOR RATING DISABILITIES Disability Ratings The Cardiovascular System § 4.104 Schedule of ratings—cardiovascular system. Diseases of the Heart Rating Note (1): Evaluate cor pulmonale, which is a form of...

  18. 38 CFR 4.97 - Schedule of ratings-respiratory system.

    Science.gov (United States)

    2010-07-01

    ...-respiratory system. 4.97 Section 4.97 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS SCHEDULE FOR RATING DISABILITIES Disability Ratings The Respiratory System § 4.97 Schedule of ratings—respiratory system. Rating DISEASES OF THE NOSE AND THROAT 6502Septum, nasal, deviation of: Traumatic only...

  19. 38 CFR 4.119 - Schedule of ratings-endocrine system.

    Science.gov (United States)

    2010-07-01

    ... minute), eye involvement, muscular weakness, loss of weight, and sympathetic nervous system...-endocrine system. 4.119 Section 4.119 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS SCHEDULE FOR RATING DISABILITIES Disability Ratings The Endocrine System § 4.119 Schedule of ratings...

  20. 18 CFR 154.313 - Schedules for minor rate changes.

    Science.gov (United States)

    2010-04-01

    ... of the End of the Test Period. (7) Schedule E. Working Capital. Show the various components provided.... Depreciation, Depletion, Amortization and Negative Salvage Expenses. Show, separately, the gas plant depreciation, depletion, amortization, and negative salvage expenses by functional classifications. For each...

  1. Identifying factors that predict the choice and success rate of radial artery catheterisation in contemporary real world cardiology practice: a sub-analysis of the PREVAIL study data.

    Science.gov (United States)

    Pristipino, Christian; Roncella, Adriana; Trani, Carlo; Nazzaro, Marco S; Berni, Andrea; Di Sciascio, Germano; Sciahbasi, Alessandro; Musarò, Salvatore Donato; Mazzarotto, Pietro; Gioffrè, Gaetano; Speciale, Giulio

    2010-06-01

    To assess: the reasons behind an operator choosing to perform radial artery catheterisation (RAC) as against femoral arterial catheterisation, and to explore why RAC may fail in the real world. A pre-determined analysis of PREVAIL study database was performed. Relevant data were collected in a prospective, observational survey of 1,052 consecutive patients undergoing invasive cardiovascular procedures at nine Italian hospitals over a one month observation period. By multivariate analysis, the independent predictors of RAC choice were having the procedure performed: (1) at a high procedural volume centre; and (2) by an operator who performs a high volume of radial procedures; clinical variables played no statistically significant role. RAC failure was predicted independently by (1) a lower operator propensity to use RAC; and (2) the presence of obstructive peripheral artery disease. A 10-fold lower rate of RAC failure was observed among operators who perform RAC for > 85% of their personal caseload than among those who use RAC < 25% of the time (3.8% vs. 33.0%, respectively); by receiver operator characteristic (ROC) analysis, no threshold value for operator RAC volume predicted RAC failure. A routine RAC in all-comers is superior to a selective strategy in terms of feasibility and success rate.

  2. 5 CFR 532.513 - Flexible and compressed work schedules.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Flexible and compressed work schedules... REGULATIONS PREVAILING RATE SYSTEMS Premium Pay and Differentials § 532.513 Flexible and compressed work schedules. Federal Wage System employees who are authorized to work flexible and compressed work schedules...

  3. Flexible proportional-rate scheduling for OFDMA system

    KAUST Repository

    Leith, Alex

    2013-10-01

    In this paper, we study the sum-rate maximization algorithms for downlink and uplink orthogonal frequency division multiple access (OFDMA) systems under proportional-rate constraint (PRC) and minimum-rate constraint. We develop a low-complexity weighted channel signal-to-noise ratio (w-SNR)-based ranking scheme for user selection on each subchannel in OFDMA combined with waterfilling (WF) power allocation. Both offline and online optimization algorithms are developed to optimize the SNR weight vector to maximize the sum rate while satisfying several constraints, such as PRC. The offline weight optimization technique relies on the analytical throughput results developed in this paper, and the online weight adaptation method tracks the user rates and meets the PRC using a subgradient search. Furthermore, we introduce a novel SNR operating region test to enhance the multiuser diversity gain and the sum rate. The proposed schemes have a low complexity, which is linear to the numbers of users and subchannels. Simulation results verify the accuracy of the developed analytical rates and fairness formulas, and show that the proposed w-SNR schemes can achieve higher sum rates than several benchmark schemes that provide the PRC with either short-term or long-term fairness. © 2013 IEEE. © 2013 ESO.

  4. Flexible proportional-rate scheduling for OFDMA system

    KAUST Repository

    Leith, Alex; Alouini, Mohamed-Slim; Kim, Dongin; (Sherman) Shen X., Xuemin; Wu, Zhiqiang

    2013-01-01

    In this paper, we study the sum-rate maximization algorithms for downlink and uplink orthogonal frequency division multiple access (OFDMA) systems under proportional-rate constraint (PRC) and minimum-rate constraint. We develop a low-complexity weighted channel signal-to-noise ratio (w-SNR)-based ranking scheme for user selection on each subchannel in OFDMA combined with waterfilling (WF) power allocation. Both offline and online optimization algorithms are developed to optimize the SNR weight vector to maximize the sum rate while satisfying several constraints, such as PRC. The offline weight optimization technique relies on the analytical throughput results developed in this paper, and the online weight adaptation method tracks the user rates and meets the PRC using a subgradient search. Furthermore, we introduce a novel SNR operating region test to enhance the multiuser diversity gain and the sum rate. The proposed schemes have a low complexity, which is linear to the numbers of users and subchannels. Simulation results verify the accuracy of the developed analytical rates and fairness formulas, and show that the proposed w-SNR schemes can achieve higher sum rates than several benchmark schemes that provide the PRC with either short-term or long-term fairness. © 2013 IEEE. © 2013 ESO.

  5. 18 CFR 35.12 - Filing of initial rate schedules and tariffs.

    Science.gov (United States)

    2010-04-01

    ... schedules of rates for emergency energy, spinning reserve or economy energy or in cases of coordination and...? (ii) A summary statement of all cost (whether fully distributed, incremental or other) computations...

  6. Single machine scheduling with time-dependent linear deterioration and rate-modifying maintenance

    OpenAIRE

    Rustogi, Kabir; Strusevich, Vitaly A.

    2015-01-01

    We study single machine scheduling problems with linear time-dependent deterioration effects and maintenance activities. Maintenance periods (MPs) are included into the schedule, so that the machine, that gets worse during the processing, can be restored to a better state. We deal with a job-independent version of the deterioration effects, that is, all jobs share a common deterioration rate. However, we introduce a novel extension to such models and allow the deterioration rates to change af...

  7. 38 CFR 4.79 - Schedule of ratings-eye.

    Science.gov (United States)

    2010-07-01

    .... Diseases of the Eye Rating 6000Choroidopathy, including uveitis, iritis, cyclitis, and choroiditis... require prescribed bed rest and treatment by a physician or other healthcare provider. 6010Tuberculosis of... severe enough to require prescribed bed rest and treatment by a physician or other healthcare provider...

  8. The PREVAIL Study

    DEFF Research Database (Denmark)

    Evans, Christopher P; Higano, Celestia S; Keane, Thomas

    2016-01-01

    BACKGROUND: Enzalutamide, an oral androgen receptor inhibitor, significantly improved overall survival (OS) and radiographic progression-free survival (rPFS) versus placebo in the PREVAIL trial of men with chemotherapy-naïve metastatic castration-resistant prostate cancer. OBJECTIVE: To assess...... in men with chemotherapy-naïve metastatic castration-resistant prostate cancer, with or without visceral disease, low- or high-volume bone disease, or lymph node only disease. PATIENT SUMMARY: Patients with metastatic castration-resistant prostate cancer-including those with or without visceral disease...

  9. 18 CFR 154.202 - Filings to initiate a new rate schedule.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Filings to initiate a new rate schedule. 154.202 Section 154.202 Conservation of Power and Water Resources FEDERAL ENERGY... contain a notice of the interdependence. (b) If a new service, facility, or rate is specifically...

  10. Game Schedules and Rate of Concussions in the National Football League.

    Science.gov (United States)

    Teramoto, Masaru; Cushman, Daniel M; Cross, Chad L; Curtiss, Heather M; Willick, Stuart E

    2017-11-01

    Concussion prevention in the National Football League (NFL) is an important priority for player safety. The NFL now has modified game schedules, and one concern is that unconventional game schedules, such as a shortened rest period due to playing on a Thursday rather than during the weekend, may lead to an increased risk of injuries. Unconventional game schedules in the NFL are associated with an increased rate of concussion. Descriptive epidemiological study. This study analyzed concussions and game schedules over the NFL regular seasons from 2012 to 2015 (4 years). Documented numbers of concussions, identified by use of the online database PBS Frontline Concussion Watch, were summarized by regular-season weeks. Association of days of rest and game location (home, away, or overseas) with the rate of concussion was examined by use of the χ 2 test. Logistic regression analysis was performed to examine the relationships of days of rest and home/away games to the risk of repeated concussions, with adjustment for player position. A total of 582 concussions were analyzed in this study. A significantly greater number of concussions occurred in the second half of the season ( P game location, or timing of the bye week by the team or the opponent ( P > .05). Game schedules were not significantly associated with the occurrence of repeat concussions ( P > .05). Unconventional game schedules in the NFL, including playing on Thursday and playing overseas, do not seem to put players at increased risk of concussions.

  11. Response-rate differences in variable-interval and variable-ratio schedules: An old problem revisited

    OpenAIRE

    Cole, Mark R.

    1994-01-01

    In Experiment 1, a variable-ratio 10 schedule became, successively, a variable-interval schedule with only the minimum interreinforcement intervals yoked to the variable ratio, or a variable-interval schedule with both interreinforcement intervals and reinforced interresponse times yoked to the variable ratio. Response rates in the variable-interval schedule with both interreinforcement interval and reinforced interresponse time yoking fell between the higher rates maintained by the variable-...

  12. Cross-layer optimized rate adaptation and scheduling for multiple-user wireless video streaming

    NARCIS (Netherlands)

    Ozcelebi, T.; Sunay, M.O.; Tekalp, A.M.; Civanlar, M.R.

    2007-01-01

    We present a cross-layer optimized video rate adaptation and user scheduling scheme for multi-user wireless video streaming aiming for maximum quality of service (QoS) for each user,, maximum system video throughput, and QoS fairness among users. These objectives are jointly optimized using a

  13. On utilization bounds for a periodic resource under rate monotonic scheduling

    NARCIS (Netherlands)

    Renssen, van A.M.; Geuns, S.J.; Hausmans, J.P.H.M.; Poncin, W.; Bril, R.J.

    2009-01-01

    This paper revisits utilization bounds for a periodic resource under the rate monotonic (RM) scheduling algorithm. We show that the existing utilization bound, as presented in [8, 9], is optimistic. We subsequently show that by viewing the unavailability of the periodic resource as a deferrable

  14. 38 CFR 4.116 - Schedule of ratings-gynecological conditions and disorders of the breast.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2010-07-01 2010-07-01 false Schedule of ratings-gynecological conditions and disorders of the breast. 4.116 Section 4.116 Pensions, Bonuses, and Veterans... wearing of pad 100 Vaginal fecal leakage four or more times per week, but less than daily, requiring...

  15. "The stone which the builders rejected...": Delay of reinforcement and response rate on fixed-interval and related schedules.

    Science.gov (United States)

    Wearden, J H; Lejeune, Helga

    2006-02-28

    The article deals with response rates (mainly running and peak or terminal rates) on simple and on some mixed-FI schedules and explores the idea that these rates are determined by the average delay of reinforcement for responses occurring during the response periods that the schedules generate. The effects of reinforcement delay are assumed to be mediated by a hyperbolic delay of reinforcement gradient. The account predicts that (a) running rates on simple FI schedules should increase with increasing rate of reinforcement, in a manner close to that required by Herrnstein's equation, (b) improving temporal control during acquisition should be associated with increasing running rates, (c) two-valued mixed-FI schedules with equiprobable components should produce complex results, with peak rates sometimes being higher on the longer component schedule, and (d) that effects of reinforcement probability on mixed-FI should affect the response rate at the time of the shorter component only. All these predictions were confirmed by data, although effects in some experiments remain outside the scope of the model. In general, delay of reinforcement as a determinant of response rate on FI and related schedules (rather than temporal control on such schedules) seems a useful starting point for a more thorough analysis of some neglected questions about performance on FI and related schedules.

  16. The role of abnormal fetal heart rate in scheduling chorionic villus sampling.

    Science.gov (United States)

    Yagel, S; Anteby, E; Ron, M; Hochner-Celnikier, D; Achiron, R

    1992-09-01

    To assess the value of fetal heart rate (FHR) measurements in predicting spontaneous fetal loss in pregnancies scheduled for chorionic villus sampling (CVS). A prospective descriptive study. Two hospital departments of obstetrics and gynaecology in Israel. 114 women between 9 and 11 weeks gestation scheduled for chorionic villus sampling (CVS). Fetal heart rate was measured by transvaginal Doppler ultrasound and compared with a monogram established from 75 fetuses. Whenever a normal FHR was recorded, CVS was performed immediately. 106 women had a normal FHR and underwent CVS; two of these pregnancies ended in miscarriage. In five pregnancies no fetal heart beats could be identified and fetal death was diagnosed. In three pregnancies an abnormal FHR was recorded and CVS was postponed; all three pregnancies ended in miscarriage within 2 weeks. Determination of FHR correlated with crown-rump length could be useful in predicting spontaneous miscarriage before performing any invasive procedure late in the first trimester.

  17. Identical parallel machine scheduling with nonlinear deterioration and multiple rate modifying activities

    Directory of Open Access Journals (Sweden)

    Ömer Öztürkoğlu

    2017-07-01

    Full Text Available This study focuses on identical parallel machine scheduling of jobs with deteriorating processing times and rate-modifying activities. We consider non linearly increasing processing times of jobs based on their position assignment. Rate modifying activities are also considered to recover the increase in processing times of jobs due to deterioration. We also propose heuristics algorithms that rely on ant colony optimization and simulated annealing algorithms to solve the problem with multiple RMAs in a reasonable amount of time. Finally, we show that ant colony optimization algorithm generates close optimal solutions and superior results than simulated annealing algorithm.

  18. OECOSYS prevailing exercise applications

    International Nuclear Information System (INIS)

    Mueck, K.; Suda, M.

    1999-10-01

    In the Research Center Seibersdorf the computer simulation code OECOSYS was installed in 1989 which represents a version of the model ECOSYS-87 developed by GSF in Neuherberg, and adapted to the Austrian situation. The model available since then simulates from input parameters such as the integral of the activity concentration in air and the ground deposition of each radionuclide as well as the precipitation values via the interception on plants and deposition on soil and the transfer of radionuclides into the various ecosystems and fodder-food chains into the various foodstuffs and calculates in this way the course of the activity concentration in these foodstuffs. Via the consumption rates of each foodstuff the contribution of the ingestion of each foodstuff and by that the total ingestion dose may be evaluated. Further, the simulation model permits the calculation of the various exposure pathways as inhalation and external irradiation from the plume and ground and enable the user to obtain a fast comparison of the various exposure pathways. In order to ensure the availability of the code and the accompanying infrastructure, by order of the federal chancellery sect. VI the computer code is run in certain intervals and test calculations are performed with it. Each exercise run was based on scenarios which could result in case of severe accidents in neighboring nuclear power plants. Generally, extremely unrealistic scenarios were assumed which do not correspond to the safety standard of the respective nuclear power plant in order to obtain calculation examples which may serve the emergency units in their planning for emergency situations. Furthermore, by these exercise runs a demonstration of the contribution of the various exposure pathways for the persons responsible for emergency management in case of a crisis shall be given to enable them to appropriately design the respective planning features. In the present report the calculations performed up to now are

  19. Contrast and autoshaping in multiple schedules varying reinforcer rate and duration.

    Science.gov (United States)

    Hamilton, B E; Silberberg, A

    1978-07-01

    Thirteen master pigeons were exposed to multiple schedules in which reinforcement frequency (Experiment I) or duration (Experiment II) was varied. In Phases 1 and 3 of Experiment I, the values of the first and second components' random-interval schedules were 33 and 99 seconds, respectively. In Phase 2, these values were 99 seconds for both components. In Experiment II, a random-interval 33-second schedule was associated with each component. During Phases 1 and 3, the first and second components had hopper durations of 7.5 and 2.5 seconds respectively. During Phase 2, both components' hopper durations were 2.5 seconds. In each experiment, positive contrast obtained for about half the master subjects. The rest showed a rate increase in both components (positive induction). Each master subject's key colors and reinforcers were synchronously presented on a response-independent basis to a yoked control. Richer component key-pecking occurred during each experiment's Phases 1 and 3 among half these subjects. However, none responded during the contrast condition (unchanged component of each experiment's Phase 2). From this it is inferred that autoshaping did not contribute to the contrast and induction findings among master birds. Little evidence of local contrast (highest rate at beginning of richer component) was found in any subject. These data show that (a) contrast can occur independently from autoshaping, (b) contrast assays during equal-valued components may produce induction, (c) local contrast in multiple schedules often does not occur, and (d) differential hopper durations can produce autoshaping and contrast.

  20. Epistaxis: Prevailing Factors and Treatment

    Directory of Open Access Journals (Sweden)

    Secchi, Myrian Marajó Dal

    2009-12-01

    Full Text Available Introduction: The epistaxis is one the most frequent otorhinolaryngologic emergencies in the medical practice. It is a benign affection, but the refractory cases require hospital admission. Objective: To evaluate prevailing factors in patients with epistaxis and treatment. Form of study: Retrospective study. Method: 60 patients with diagnosis of epistaxis were evaluated and they needed hospital admission between 2005 and 2006. Results: The main prevailing factors were: Systemic arterial hypertension 36% (n= 22, trauma 16% (n=10 and coagulopathy 5% (n=3. The treatment was the use of nasal splint: anterior 58% (n=35 and antero-posterior 27% (n=16, the electrocauterization of the identified bloody point 7% (n=4, endoscopic arterial bandage 8% (n=5 in severe epistaxis. For the patients with antero-posterior splint with recurrence of bleeding in the first 24 hours (five patients, after clinical stabilization, an arterial bandage was indicated by endoscopic means; four patients had systemic arterial hypertension and in one patient no prevailing factor was identified. Conclusion: The main associated prevailing factors were systemic arterial hypertension, trauma and coagulopathy. The treatment depends on the type, severity and cause of bleeding, initially the anterior and antero-posterior splint for bleeding control. The early endoscopic arterial bandage is indicated in patients with severe epistaxis and prevailing factors, and prolonged admission and morbidities associated with nasal splint should be avoided.

  1. Time of day variation in polyp detection rate for colonoscopies performed on a 3-hour shift schedule.

    LENUS (Irish Health Repository)

    Munson, Gregory W

    2011-03-01

    Recent research suggests that the colonoscopy polyp detection rate (PDR) varies by time of day, possibly because of endoscopist fatigue. Mayo Clinic Rochester (MCR) schedules colonoscopies on 3-hour shifts, which should minimize fatigue.

  2. An evaluation of multiple-schedule variations to reduce high-rate requests in the picture exchange communication system.

    Science.gov (United States)

    Landa, Robin; Hanley, Gregory P

    2016-06-01

    Using procedures similar to those of Tiger, Hanley, and Heal (2006), we compared two multiple-schedule variations (S+/S- and S+ only) to treat high-rate requests for edible items in the Picture Exchange Communication System (PECS). Two individuals with autism participated, after they showed persistent requests for edible items after PECS training. Stimulus control was achieved only with the multiple schedule that involved presentation of a discriminative stimulus during reinforcement components and its removal during extinction components (S+ only). Discriminated requests were maintained for the 1 participant who experienced schedule thinning. © 2016 Society for the Experimental Analysis of Behavior.

  3. 12 CFR 747.603 - Prevailing party.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Prevailing party. 747.603 Section 747.603 Banks... in NCUA Board Adjudications § 747.603 Prevailing party. An eligible applicant may be a “prevailing... dismissed. In appropriate situations an applicant may also have prevailed if the outcome of the proceeding...

  4. Financing Educational Facility Construction: Prevailing Wage Litigation.

    Science.gov (United States)

    Goldblatt, Steven M.; Wood, R. Craig

    This chapter presents an up-to-date analysis of prevailing state wage laws that affect educational facility construction or renovation and highlights relevant prevailing wage litigation in many states. Currently, 13 states have no prevailing wage laws for public works. The other 37 states and the District of Columbia do have prevailing wage laws…

  5. Effects of reinforcer magnitude on responding under differential-reinforcement-of-low-rate schedules of rats and pigeons.

    Science.gov (United States)

    Doughty, Adam H; Richards, Jerry B

    2002-07-01

    Experiment I investigated the effects of reinforcer magnitude on differential-reinforcement-of-low-rate (DRL) schedule performance in three phases. In Phase 1, two groups of rats (n = 6 and 5) responded under a DRI. 72-s schedule with reinforcer magnitudes of either 30 or 300 microl of water. After acquisition, the water amounts were reversed for each rat. In Phase 2, the effects of the same reinforcer magnitudes on DRL 18-s schedule performance were examined across conditions. In Phase 3, each rat responded unider a DR1. 18-s schedule in which the water amotnts alternated between 30 and 300 microl daily. Throughout each phase of Experiment 1, the larger reinforcer magnitude resulted in higher response rates and lower reinforcement rates. The peak of the interresponse-time distributions was at a lower value tinder the larger reinforcer magnitude. In Experiment 2, 3 pigeons responded under a DRL 20-s schedule in which reinforcer magnitude (1-s or 6-s access to grain) varied iron session to session. Higher response rates and lower reinforcement rates occurred tinder the longer hopper duration. These results demonstrate that larger reinforcer magnitudes engender less efficient DRL schedule performance in both rats and pigeons, and when reinforcer magnitude was held constant between sessions or was varied daily. The present results are consistent with previous research demonstrating a decrease in efficiency as a function of increased reinforcer magnituide tinder procedures that require a period of time without a specified response. These findings also support the claim that DRI. schedule performance is not governed solely by a timing process.

  6. Task Balanced Workflow Scheduling Technique considering Task Processing Rate in Spot Market

    Directory of Open Access Journals (Sweden)

    Daeyong Jung

    2014-01-01

    Full Text Available Recently, the cloud computing is a computing paradigm that constitutes an advanced computing environment that evolved from the distributed computing. And the cloud computing provides acquired computing resources in a pay-as-you-go manner. For example, Amazon EC2 offers the Infrastructure-as-a-Service (IaaS instances in three different ways with different price, reliability, and various performances of instances. Our study is based on the environment using spot instances. Spot instances can significantly decrease costs compared to reserved and on-demand instances. However, spot instances give a more unreliable environment than other instances. In this paper, we propose the workflow scheduling scheme that reduces the out-of-bid situation. Consequently, the total task completion time is decreased. The simulation results reveal that, compared to various instance types, our scheme achieves performance improvements in terms of an average combined metric of 12.76% over workflow scheme without considering the processing rate. However, the cost in our scheme is higher than an instance with low performance and is lower than an instance with high performance.

  7. PREVAIL: latest electron optics results

    Science.gov (United States)

    Pfeiffer, Hans C.; Golladay, Steven D.; Gordon, Michael S.; Kendall, Rodney A.; Lieberman, Jon E.; Rockrohr, James D.; Stickel, Werner; Yamaguchi, Takeshi; Okamoto, Kazuya; Umemoto, Takaaki; Shimizu, Hiroyasu; Kojima, Shinichi; Hamashima, Muneki

    2002-07-01

    The PREVAIL electron optics subsystem developed by IBM has been installed at Nikon's facility in Kumagaya, Japan, for integration into the Nikon commercial EPL stepper. The cornerstone of the electron optics design is the Curvilinear Variable Axis Lens (CVAL) technique originally demonstrated with a proof of concept system. This paper presents the latest experimental results obtained with the electron optical subsystem at Nikon's facility. The results include micrographs illustrating proper CVAL operation through the spatial resolution achieved over the entire optical field of view. They also include data on the most critical issue of the EPL exposure approach: subfield stitching. The methodology of distortion correction will be described and both micrographs and metrology data of stitched subfields will be presented. This paper represents a progress report of the IBM/Nikon alliance activity on EPL.

  8. Non preemptive soft real time scheduler: High deadline meeting rate on overload

    Science.gov (United States)

    Khalib, Zahereel Ishwar Abdul; Ahmad, R. Badlishah; El-Shaikh, Mohamed

    2015-05-01

    While preemptive scheduling has gain more attention among researchers, current work in non preemptive scheduling had shown promising result in soft real time jobs scheduling. In this paper we present a non preemptive scheduling algorithm meant for soft real time applications, which is capable of producing better performance during overload while maintaining excellent performance during normal load. The approach taken by this algorithm has shown more promising results compared to other algorithms including its immediate predecessor. We will present the analysis made prior to inception of the algorithm as well as simulation results comparing our algorithm named gutEDF with EDF and gEDF. We are convinced that grouping jobs utilizing pure dynamic parameters would produce better performance.

  9. A new variable interval schedule with constant hazard rate and finite time range.

    Science.gov (United States)

    Bugallo, Mehdi; Machado, Armando; Vasconcelos, Marco

    2018-05-27

    We propose a new variable interval (VI) schedule that achieves constant probability of reinforcement in time while using a bounded range of intervals. By sampling each trial duration from a uniform distribution ranging from 0 to 2 T seconds, and then applying a reinforcement rule that depends linearly on trial duration, the schedule alternates reinforced and unreinforced trials, each less than 2 T seconds, while preserving a constant hazard function. © 2018 Society for the Experimental Analysis of Behavior.

  10. 12 CFR 263.102 - Prevailing party.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Prevailing party. 263.102 Section 263.102 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM RULES... Prevailing party. Only an eligible applicant that prevailed on the merits of an adversary proceeding may...

  11. 12 CFR 308.173 - Prevailing party.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Prevailing party. 308.173 Section 308.173 Banks....173 Prevailing party. (a) General rule. An eligible applicant who, following an adversary adjudication has gained victory on the merits in the proceeding is a “prevailing party”. An eligible applicant may...

  12. Combined Rate and Power Allocation with Link Scheduling in Wireless Data Packet Relay Networks with Fading Channels

    OpenAIRE

    Subhrakanti Dey; Minyi Huang

    2007-01-01

    We consider a joint rate and power control problem in a wireless data traffic relay network with fading channels. The optimization problem is formulated in terms of power and rate selection, and link transmission scheduling. The objective is to seek high aggregate utility of the relay node when taking into account buffer load management and power constraints. The optimal solution for a single transmitting source is computed by a two-layer dynamic programming algorithm which leads to optimal ...

  13. A consideration of distributions and treatment schedules in high dose rate intracavitary therapy of carcinoma of the uterine cervix

    International Nuclear Information System (INIS)

    Sakata, Suoh; Sato, Sigehiro; Nakano, Masao; Iida, Koyo; Yui, Nobuharu

    1979-01-01

    A remotely controlled afterloading device for high dose rate intracavitary radiation, the remote afterloader Shimadzu Ralstron MTSW-20, was installed at Chiba Cancer Center Hospital in 1973 and put into clinical use for the treatment of carcinoma of the uterine cervix. Before the clinical use, isodose distributions and treatment schedules were investigated, compared with the low dose rate intracavitary radiation by linear sources of 137 Cs used hitherto. The isodose distributions, calculated by using an electronic computer, for various combinations of the length of uterine canal and the separation of vaginal applicators, were the same as those obtained with linear sources. As for the treatment schedules, by using PT (partial tolerance) which was derived from NSD concept of Ellis, a number of fractional radiation regimes with high dose rate, equivalent to continuous low dose rate radiation, was calculated. From these, a dose of 600 rad per fraction to point A every week has been chosen as the standard radiation schedule. The number of fractions has been varied with the clinical stages. Furthermore, some changes of total dose or small modification of dose distribution have been made for individual lesions. According to the preliminary results, three-year cumulative survival rate was 68.7% and complication rate was 15.2%. Comparing these results with those of the treatment at low dose rate, the former is nearly equal, while the latter is lower. The reduction of complication rate is probably due to the improvement of therapeutic techniques such as continuous observation by fractionated intracavitary radiation, variety of isodose distributions and accuracy of source placement by a short treatment time. (author)

  14. A Three-Stage Optimization Algorithm for the Stochastic Parallel Machine Scheduling Problem with Adjustable Production Rates

    Directory of Open Access Journals (Sweden)

    Rui Zhang

    2013-01-01

    Full Text Available We consider a parallel machine scheduling problem with random processing/setup times and adjustable production rates. The objective functions to be minimized consist of two parts; the first part is related with the due date performance (i.e., the tardiness of the jobs, while the second part is related with the setting of machine speeds. Therefore, the decision variables include both the production schedule (sequences of jobs and the production rate of each machine. The optimization process, however, is significantly complicated by the stochastic factors in the manufacturing system. To address the difficulty, a simulation-based three-stage optimization framework is presented in this paper for high-quality robust solutions to the integrated scheduling problem. The first stage (crude optimization is featured by the ordinal optimization theory, the second stage (finer optimization is implemented with a metaheuristic called differential evolution, and the third stage (fine-tuning is characterized by a perturbation-based local search. Finally, computational experiments are conducted to verify the effectiveness of the proposed approach. Sensitivity analysis and practical implications are also discussed.

  15. Prevailing Torque Locking Feature in Threaded Fasteners Using Anaerobic Adhesive

    Science.gov (United States)

    Hernandez, Alan; Hess, Daniel P.

    2016-01-01

    This paper presents results from tests to assess the use of anaerobic adhesive for providing a prevailing torque locking feature in threaded fasteners. Test procedures are developed and tests are performed on three fastener materials, four anaerobic adhesives, and both unseated assembly conditions. Five to ten samples are tested for each combination. Tests for initial use, reuse without additional adhesive, and reuse with additional adhesive are performed for all samples. A 48-hour cure time was used for all initial use and reuse tests. Test data are presented as removal torque versus removal angle with the specification required prevailing torque range added for performance assessment. Percent specification pass rates for the all combinations of fastener material, adhesive, and assembly condition are tabulated and reveal use of anaerobic adhesive as a prevailing torque locking feature is viable. Although not every possible fastener material and anaerobic adhesive combination provides prevailing torque values within specification, any combination can be assessed using the test procedures presented. Reuse without additional anaerobic adhesive generally provides some prevailing torque, and in some cases within specification. Reuse with additional adhesive often provides comparable removal torque data as in initial use.

  16. Combined Rate and Power Allocation with Link Scheduling in Wireless Data Packet Relay Networks with Fading Channels

    Directory of Open Access Journals (Sweden)

    Subhrakanti Dey

    2007-08-01

    Full Text Available We consider a joint rate and power control problem in a wireless data traffic relay network with fading channels. The optimization problem is formulated in terms of power and rate selection, and link transmission scheduling. The objective is to seek high aggregate utility of the relay node when taking into account buffer load management and power constraints. The optimal solution for a single transmitting source is computed by a two-layer dynamic programming algorithm which leads to optimal power, rate, and transmission time allocation at the wireless links. We further consider an optimal power allocation problem for multiple transmitting sources in the same framework. Performances of the resource allocation algorithms including the effect of buffer load control are illustrated via extensive simulation studies.

  17. 18 CFR 340.1 - Suspended rate schedules; procedure; refund requirement; administered by the Federal Energy...

    Science.gov (United States)

    2010-04-01

    ... Interstate Commerce Act shall keep accurate accounts in detail of all amounts received by reason of the rates... effect immediately prior to the date the proposed change became effective, if applicable; (3) The... refunds are made as follows: (i) At an average prime rate for each calendar quarter on amounts held on or...

  18. Presenting a multi-objective generation scheduling model for pricing demand response rate in micro-grid energy management

    International Nuclear Information System (INIS)

    Aghajani, G.R.; Shayanfar, H.A.; Shayeghi, H.

    2015-01-01

    Highlights: • Using DRPs to cover the uncertainties resulted from power generation by WT and PV. • Proposing the use of price-offer packages and amount of DR for implement DRPs. • Considering a multi-objective scheduling model and use of MOPSO algorithm. - Abstract: In this paper, a multi-objective energy management system is proposed in order to optimize micro-grid (MG) performance in a short-term in the presence of Renewable Energy Sources (RESs) for wind and solar energy generation with a randomized natural behavior. Considering the existence of different types of customers including residential, commercial, and industrial consumers can participate in demand response programs. As with declare their interruptible/curtailable demand rate or select from among different proposed prices so as to assist the central micro-grid control in terms of optimizing micro-grid operation and covering energy generation uncertainty from the renewable sources. In this paper, to implement Demand Response (DR) schedules, incentive-based payment in the form of offered packages of price and DR quantity collected by Demand Response Providers (DRPs) is used. In the typical micro-grid, different technologies including Wind Turbine (WT), PhotoVoltaic (PV) cell, Micro-Turbine (MT), Full Cell (FC), battery hybrid power source and responsive loads are used. The simulation results are considered in six different cases in order to optimize operation cost and emission with/without DR. Considering the complexity and non-linearity of the proposed problem, Multi-Objective Particle Swarm Optimization (MOPSO) is utilized. Also, fuzzy-based mechanism and non-linear sorting system are applied to determine the best compromise considering the set of solutions from Pareto-front space. The numerical results represented the effect of the proposed Demand Side Management (DSM) scheduling model on reducing the effect of uncertainty obtained from generation power and predicted by WT and PV in a MG.

  19. 18 CFR 300.11 - Technical support for the rate schedule.

    Science.gov (United States)

    2010-04-01

    ... expenses; and (C) Replacements made during the historic period and replacements projected to be made during... replacement costs. (4) Statement D—Interest Expenses; Repayment of Investments and Debt Capital. (i) For each... the last five years of the historic period, as defined in section 300.1(b)(3); (ii) For the rate test...

  20. 38 CFR 4.114 - Schedule of ratings-digestive system.

    Science.gov (United States)

    2010-07-01

    ... severe colic distension, nausea or vomiting, following severe peritonitis, ruptured appendix, perforated..., constipation (perhaps alternating with diarrhea) or abdominal distension 10 Mild 0 Note: Ratings for adhesions... diffuse destruction or weakening of muscular and fascial support of abdominal wall so as to be inoperable...

  1. 38 CFR 4.71a - Schedule of ratings-musculoskeletal system.

    Science.gov (United States)

    2010-07-01

    ... contraction of plantar fascia with dropped forefoot, all toes hammer toes, very painful callosities, marked... at ankle to right angle, shortened plantar fascia, and marked tenderness under metatarsal heads... objectively demonstrated) 10 The Ankle Rating 5270Ankle, ankylosis of: In plantar flexion at more than 40°, or...

  2. 38 CFR 4.117 - Schedule of ratings-hemic and lymphatic systems.

    Science.gov (United States)

    2010-07-01

    ... based upon that or any subsequent examination shall be subject to the provisions of § 3.105(e) of this... or any subsequent examination shall be subject to the provisions of § 3.105(e) of this chapter. If there has been no recurrence, rate on residuals. 7704Polycythemia vera: During periods of treatment with...

  3. Impact of touring, performance schedule, and definitions on 1-year injury rates in a modern dance company.

    Science.gov (United States)

    Bronner, Shaw; Wood, Lily

    2017-11-01

    There is ongoing debate about how to define injury in dance: the most encompassing one or a time-loss definition. We examined the relationship between touring, performance schedule and injury definition on injury rates in a professional modern dance company over one-year. In-house healthcare management tracked 35 dancers for work-related musculoskeletal injuries (WMSI), time-loss injuries (TLinj), complaints, and exposure. The year was divided into 6 segments to allow comparison of effects of performance, rehearsal, and touring. Injuries/segment were converted into injuries/1000-h dance exposure. We conducted negative binomial regression analysis to determine differences between segments, P ≤ 0.05. Twenty WMSI, 0.44 injuries/1000-h, were sustained over one-year. WMSI were 6 times more likely to occur in Segment-6, compared with other segments (incident rate ratio = 6.055, P = 0.031). The highest rate of TLinj and traumatic injuries also occurred in Segment-6, reflecting concentrated rehearsal, New York season and performances abroad. More overuse injuries occurred in Segment-2, an international tour, attributed to raked stages. Lack of methods to quantify performance other than injury may mask effects of touring on dancer's well-being. Tracking complaints permits understanding of stressors to specific body regions and healthcare utilisation; however, TLinj remain the most important injuries to track because they impact other dancers and organisational costs.

  4. Medium-dose-rate brachytherapy of cancer of the cervix: preliminary results of a prospectively designed schedule based on the linear-quadratic model

    International Nuclear Information System (INIS)

    Leborgne, Felix; Fowler, Jack F.; Leborgne, Jose H.; Zubizarreta, Eduardo; Curochquin, Rene

    1999-01-01

    Purpose: To compare results and complications of our previous low-dose-rate (LDR) brachytherapy schedule for early-stage cancer of the cervix, with a prospectively designed medium-dose-rate (MDR) schedule, based on the linear-quadratic model (LQ). Methods and Materials: A combination of brachytherapy, external beam pelvic and parametrial irradiation was used in 102 consecutive Stage Ib-IIb LDR treated patients (1986-1990) and 42 equally staged MDR treated patients (1994-1996). The planned MDR schedule consisted of three insertions on three treatment days with six 8-Gy brachytherapy fractions to Point A, two on each treatment day with an interfraction interval of 6 hours, plus 18 Gy external whole pelvic dose, and followed by additional parametrial irradiation. The calculated biologically effective dose (BED) for tumor was 90 Gy 10 and for rectum below 125 Gy 3 . Results: In practice the MDR brachytherapy schedule achieved a tumor BED of 86 Gy 10 and a rectal BED of 101 Gy 3 . The latter was better than originally planned due to a reduction from 85% to 77% in the percentage of the mean dose to the rectum in relation to Point A. The mean overall treatment time was 10 days shorter for MDR in comparison with LDR. The 3-year actuarial central control for LDR and MDR was 97% and 98% (p = NS), respectively. The Grades 2 and 3 late complications (scale 0 to 3) were 1% and 2.4%, respectively for LDR (3-year) and MDR (2-year). Conclusions: LQ is a reliable tool for designing new schedules with altered fractionation and dose rates. The MDR schedule has proven to be an equivalent treatment schedule compared with LDR, with an additional advantage of having a shorter overall treatment time. The mean rectal BED Gy 3 was lower than expected

  5. Decentralized scheduling algorithm to improve the rate of production without increasing the stocks of intermediates; Zaiko wo fuyasu kotonaku seisan sokudo wo kojo saseru jiritsu bunsangata sukejuringu arugorizumu

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Kazuhiro; Shiigi, Daisuke; Tsuge, Yoshifumi; Matsuyama, Hisayoshi [Kyushu University, Fukuoka (Japan). Department of Chemical Engineering

    1999-03-10

    In a factory with a multi-stage production system, push-type scheduling methods can hardly improve the production rate without increasing the stocks of intermediates. For products whose specifications are known before their orders, a pull-type scheduling method named Kanban system has been developed, and has succeeded to improve the production rate without increasing the stocks of intermediates. The Kanban system, however, is not applicable to custom-made products whose specifications are not known before their orders. In this paper, a 'Virtual Kanban (VK) system' is presented as a pull-type scheduling method which is applicable to custom-made products, and its usefulness is demonstrated by simulation of an application specific integrated circuit manufacturing facility. (author)

  6. Outcomes Associated With 3 Treatment Schedules of High-Dose-Rate Brachytherapy Monotherapy for Favorable-Risk Prostate Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Jawad, Maha Saada; Dilworth, Joshua T.; Gustafson, Gary S.; Ye, Hong; Wallace, Michelle [Department of Radiation Oncology, Oakland University William Beaumont School of Medicine, Royal Oak, Michigan (United States); Martinez, Alvaro [Michigan HealthCare Professionals/21" s" t Century Oncology, Farmington Hills, Michigan (United States); Chen, Peter Y. [Department of Radiation Oncology, Oakland University William Beaumont School of Medicine, Royal Oak, Michigan (United States); Krauss, Daniel J., E-mail: DKrauss@beaumont.edu [Department of Radiation Oncology, Oakland University William Beaumont School of Medicine, Royal Oak, Michigan (United States)

    2016-03-15

    Purpose: We report the outcomes associated with 3 high-dose-rate (HDR) brachytherapy regimens used as monotherapy for favorable-risk prostate cancer. Methods and Materials: Four hundred ninety-four patients with stage ≤T2b prostate cancer, Gleason score ≤7, and prostate-specific antigen levels ≤15 ng/mL underwent HDR brachytherapy as monotherapy. Of those, 319 received 38 Gy in 4 fractions, 79 received 24 Gy in 2 fractions, and 96 received 27 Gy in 2 fractions. Acute and chronic genitourinary (GU) and gastrointestinal (GI) toxicities were defined as side effects occurring ≤6 and >6 months, respectively, after radiation therapy (RT) and were graded according to the Common Terminology Criteria for Adverse Events version 3.0. The time to toxicity was calculated from the date of RT completion. Variables were analyzed with χ{sup 2} test. P values <.05 were considered significant. Results: The median overall follow-up time was 4 years (range, 5.5, 3.5, and 2.5 years for 38 Gy, 24 Gy, and 27 Gy, respectively, P<.001). Acute and chronic grade ≥2 GU and GI toxicity profiles were similar among groups. Acceptable rates of grade 2 GU toxicities were seen with overall acute/chronic frequency/urgency, dysuria, retention, incontinence, and hematuria rates of 14%/20%, 6%/7%, 7%/4%, 1.5%/2%, and 1.5%/7%, respectively. Minimal grade 3 and no grade 4 or 5 toxicities were seen. Grade 1, 2, and 3 chronic urethral stricture rates were 0.3%, 2%, and 1%, respectively. All GI toxicities were similar between groups, with overall rates of acute/chronic grade 2 diarrhea, rectal pain/tenesmus, rectal bleeding, and proctitis of 1%/1%, <1%/0.5%, 0%/2%, and <1%/1%, respectively. No grade 3, 4, or 5 toxicities were seen. All comparisons were similar for hormone-naïve patients. The median time to maximal GU/GI toxicity was similar between groups, ranging from 1 to 1.6 to 0.9 to 1.2 years, respectively. There were no differences in clinical outcomes between the 3 groups at 5

  7. Examining the Role of Race, Ethnicity, and Gender on Social and Behavioral Ratings within the Autism Diagnostic Observation Schedule

    Science.gov (United States)

    Harrison, Ashley J.; Long, Kristin A.; Tommet, Douglas C.; Jones, Richard N.

    2017-01-01

    The Autism Diagnostic Observation Schedule (ADOS) is widely used to assess symptoms of autism spectrum disorder (ASD). Given well-documented differences in social behaviors across cultures, this study examined whether item-level biases exist in ADOS scores across sociodemographic groups (race, ethnicity, and gender). We examined a subset of ten…

  8. 29 CFR 505.3 - Prevailing minimum compensation.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Prevailing minimum compensation. 505.3 Section 505.3 Labor... HUMANITIES § 505.3 Prevailing minimum compensation. (a)(1) In the absence of an alternative determination...)(2) of this section, the prevailing minimum compensation required to be paid under the Act to the...

  9. 29 CFR 4.51 - Prevailing in the locality determinations.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Prevailing in the locality determinations. 4.51 Section 4.51... Procedures § 4.51 Prevailing in the locality determinations. (a) Information considered. The minimum monetary... benefits contained in collective bargaining agreements where they have been determined to prevail in a...

  10. 26 CFR 301.7430-5 - Prevailing party.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Prevailing party. 301.7430-5 Section 301.7430-5... Prevailing party. (a) In general. For purposes of an award of reasonable administrative costs under section... prevailing party only if— (1) The position of the Internal Revenue Service was not substantially justified...

  11. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  12. Stage, tumor growth rate and optimal dose fractionation schedules in the treatment of squamous cell carcinoma of the head and neck

    International Nuclear Information System (INIS)

    Sugawara, Tadashi; Morita, Mamoru; Aihara, Toshinori; Tanaka, Osamu

    1983-01-01

    In 77 patients with cancer of the head and neck, 45 patients received radiotherapy alone, while 32 patients with T 1 or T 2 glottic cancer received combined therapy with laryngomicrosurgery performed prior to or during the course of irradiation. These T 1 and T 2 groups were separately analyzed from other T 1 and T 2 groups as T sub(LMS). Local recurrence rates were compared concerning overall time and fraction size in following three subgroups, i.e., T sub(LMS), Tsub(1+2), and Tsub(3+4). No significant correlation was detected between total dose converted to partial tolerance (PT) and local control in all subgroups except for Tsub(3+4), in which local recurrence rate was rather higher in high PT range. Local control was significantly dependent on overall treatment time and fraction size, differently by tumor stage. Favorable fractionation schedules considered as optimal for T sub(LMS) were those in which treatment was given 5 times weekly with a daily dose rate more than 196 rad in a shorter overall time of less than 42 days. In contrast to T sub(LMS), effective schedules for Tsub(3+4) consisted of longer overall time of more than 60 days and a lower daily dose rate of less than 153 rad. In Tsub(1+2), the optimal schedule was needed to be altered according to rapidness of progression of disease characterised by duration of the complaints, which was statistically proved to be significantly shorter in Tsub(1+2) than Tsub(3+4). Rapidity-adjusted schedule consisted of a shorter over-all time of less than 49 days with a daily dose rate of more than 175 rad 5 fractions a week for a case having a duration of complaints of less than 2.9 months, and a longer overall time of more than 50 days with a daily dose rate of less than 174 rad for a case having a duration of more than 3 months. (J.P.N.)

  13. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  14. 38 CFR 4.88b - Schedule of ratings-infectious diseases, immune disorders and nutritional deficiencies.

    Science.gov (United States)

    2010-07-01

    ... disease, and for 3 months convalescence 100 Thereafter rate residuals such as renal necrosis under the... complications of nervous system, vascular system, eyes or ears. (See DC 7004, syphilitic heart disease, DC 8013...

  15. Evaluating the effectiveness of mixed-integer linear programming for day-ahead hydro-thermal self-scheduling considering price uncertainty and forced outage rate

    International Nuclear Information System (INIS)

    Esmaeily, Ali; Ahmadi, Abdollah; Raeisi, Fatima; Ahmadi, Mohammad Reza; Esmaeel Nezhad, Ali; Janghorbani, Mohammadreza

    2017-01-01

    A new optimization framework based on MILP model is introduced in the paper for the problem of stochastic self-scheduling of hydrothermal units known as HTSS Problem implemented in a joint energy and reserve electricity market with day-ahead mechanism. The proposed MILP framework includes some practical constraints such as the cost due to valve-loading effect, the limit due to DRR and also multi-POZs, which have been less investigated in electricity market models. For the sake of more accuracy, for hydro generating units’ model, multi performance curves are also used. The problem proposed in this paper is formulated using a model on the basis of a stochastic optimization technique while the objective function is maximizing the expected profit utilizing MILP technique. The suggested stochastic self-scheduling model employs the price forecast error in order to take into account the uncertainty due to price. Besides, LMCS is combined with roulette wheel mechanism so that the scenarios corresponding to the non-spinning reserve price and spinning reserve price as well as the energy price at each hour of the scheduling are generated. Finally, the IEEE 118-bus power system is used to indicate the performance and the efficiency of the suggested technique. - Highlights: • Characterizing the uncertainties of price and FOR of units. • Replacing the fixed ramping rate constraints with the dynamic ones. • Proposing linearized model for the valve-point effects of thermal units. • Taking into consideration the multi-POZs relating to the thermal units. • Taking into consideration the multi-performance curves of hydroelectric units.

  16. Immediate occlusal loading of NanoTite PREVAIL implants: a prospective 1-year clinical and radiographic study.

    Science.gov (United States)

    Ostman, Pär-Olov; Wennerberg, Ann; Albrektsson, Tomas

    2010-03-01

    Recently, a new implant surface texture, featuring application of nanometer-scale calcium phosphate has been shown to enhance early bone fixation and formation in preclinical studies and in human histomorphometric studies, which may be beneficial in immediate loading situations. The purpose of the present prospective clinical study was to, during 1 year, clinically and radiographically evaluate a nanometer scale surface modified implant placed for immediate loading of fixed prostheses in both maxillary and mandibular regions. Thirty-five out of 38 patients who needed implant treatment and met inclusion criteria agreed to participate in the study and were consecutively enrolled. Surgical implant placement requirements consisted of a final torque of a least 25 Ncm prior to final seating and an implant stability quotient above 55. A total of 102 NanoTite PREVAIL (NTP) implants (BIOMET 3i, Palm Beach Gardens, FL, USA) (66 maxillary and 36 mandibular) were placed by one investigator, and the majority of these were placed in posterior regions (65%) and in soft bone (69%). A total of 44 prosthetic constructions were evaluated consisting of 14 single-tooth restorations, 26 fixed partial dentures, and four complete fixed restorations. All provisional constructions were delivered within 1 hour, and the final constructions placed after 4 months. Implants were monitored for clinical and radiographic outcomes at follow-up examinations scheduled for 3, 6, and 12 months. Of the 102 study implants, one implant failed. The simple cumulative survival rate value at 1 year was 99.2%. The average marginal bone resorption was 0.37 mm (SD 0.39) during the first year in function. According to the success criteria of Albrektsson and Zarb, success grade 1 was found with 93% of the implants. Although limited to the short follow-up, immediate loading of NanoTite Prevail implants seems to be a viable option in implant rehabilitation, at least when a good initial fixation is achieved.

  17. 76 FR 21036 - Application of the Prevailing Wage Methodology in the H-2B Program

    Science.gov (United States)

    2011-04-14

    ... Department to ``promulgate new rules concerning the calculation of the prevailing wage rate in the H-2B... wage methodology set forth in this Rule applies only to wages paid for work performed on or after...: Notice. SUMMARY: On January 19, 2011, the Department of Labor (Department) published a final rule, Wage...

  18. A case for 'prevailing ecology' as premium determinant in home ...

    African Journals Online (AJOL)

    A case for 'prevailing ecology' as premium determinant in home-based child care ... Ewe mothers located in Dzemeni a migrant, lakeside community in Ghana. ... It builds a case from the analysis of definitions and concepts in care literature.

  19. Effects of Prevailing Winds on Turbidity of a Shallow Estuary

    OpenAIRE

    Cho, Hyun Jung

    2007-01-01

    Estuarine waters are generally more turbid than lakes or marine waters due to greater algal mass and continual re-suspension of sediments. The varying effects of diurnal and seasonal prevailing winds on the turbidity condition of a wind-dominated estuary were investigated by spatial and statistical analyses of wind direction, water level, turbidity, chlorophyll a, and PAR (Photosynthetically Active Radiation) collected in Lake Pontchartrain, Louisiana, USA. The prolonged prevailing winds were...

  20. Impact of Federal tax policy and electric utility rate schedules upon the solar building/electric utility interface. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, S.L.; Wirtshafter, R.M.; Abrash, M.; Anderson, B.; Sullivan, P.; Kohler, J.

    1978-10-01

    An analysis is performed to show that a utility solar-passive strategy can be used rather effectively in aiding the utility to obtain more efficient load factors and lower costs. The objectives are to determine the impact of active and passive solar energy designs for space conditioning and hot water heating for the residential sector upon the diurnal and annual load curves for several utilities, to assess the effect of present utility pricing policies, and to examine alternative pricing schemes, as well as Federal and state tax credits, as they may affect the optimal sizing and configuration of active solar and passive solar building components. The methodology, the systems model, an overall building design, building cost determination, and a description of TRNSYS are presented. The major parameters discussed that distinguish variation in the cost-effectiveness of particular building design fall into 5 categories: the weather, building configurations, building costs, utility costs and rates, and financial parameters (inclusive of tax credits for solar and energy conservation investment). Five utilities are studied: Colorado Springs Department of Public Utilities; Public Service Co. of New Mexico; New England Electric System; Pacific Gas and Electric; and Georgia Power Co.

  1. Correlation between the pain numeric rating scale and the 12-item WHO Disability Assessment Schedule 2.0 in patients with musculoskeletal pain.

    Science.gov (United States)

    Saltychev, Mikhail; Bärlund, Esa; Laimi, Katri

    2018-03-01

    The aim of this study was to assess the correlation between pain severity measured on a numeric rating scale and restrictions of functioning measured with the WHO Disability Assessment Schedule (WHODAS 2.0). This was a cross-sectional study of 1207 patients with musculoskeletal pain conditions. Correlation was assessed using Spearman's and Pearson tests. Although all the Spearman's rank correlations between WHODAS 2.0 items and pain severity were statistically significant, they were mostly weak, with only a few moderate associations for 'S2 household responsibilities', 'S8 washing', 'S9 dressing', and 'S12 day-to-day work'. The correlation between the WHODAS 2.0 total score and pain severity was also moderate: 0.41 [95% confidence interval (CI): 0.36-0.45] for average pain and 0.42 (95% CI: 0.37-0.46) for worst pain. The correlation between the WHODAS 2.0 total score and pain level was also assessed using Pearson's product-moment correlation, yielding figures that were similar to Spearman's correlation: 0.42 (Pcorrelation between pain severity measured by numeric rating scale and functioning level measured by WHODAS 2.0 was weak to moderate, with slightly stronger associations in physical domains of functioning.

  2. Response of different injector typologies to dwell time variations and a hydraulic analysis of closely-coupled and continuous rate shaping injection schedules

    International Nuclear Information System (INIS)

    Ferrari, A.; Mittica, A.

    2016-01-01

    Highlights: • Direct and indirect acting injectors are tested considering multiple injections. • The injection fusion threshold is higher for ballistic injectors than for stroke-end limited injectors. • The internal dynamics of the injector is analyzed for closely-coupled double injections. • Different regimes are identified and classified in the short dwell time range. • Innovative rate shaping injection schedules are defined for solenoid injectors. - Abstract: The multiple injection performance of Common Rail injectors has been analyzed at a hydraulic test rig as the dwell time was varied. The dependence of the injected volume on the dwell time has been investigated for direct acting piezoelectric and hydraulically-controlled (or indirect-acting) servo injectors. The injected fuel volumes in the long dwell-time range have been shown to be affected by the pressure waves that travel along the high pressure circuit for hydraulically-controlled servo injectors. On the other hand, the influence of pressure-wave-induced disturbances on multiple injection performance has been shown to be negligible for direct acting piezoelectric injectors. An analysis of closely-coupled injections has been conducted on a solenoid injector. When the dwell time is progressively reduced below a critical value, an increase in the fuel quantity that is injected in the second shot is observed. Injection fusion phenomena occur as the dwell time is diminished below a certain threshold and a maximum in the fuel volume, which is injected during the joint injections, is eventually detected for a very short electric dwell time value close to 100 μs. The cycle-to-cycle dispersion around this dwell time value results to be reduced significantly. A previously developed 1D model of the fuel injection system has been applied to analyze the injector transients. Detailed knowledge of the injection dynamics in the short dwell time region is of fundamental importance to optimize the

  3. Baseline incidence and severity of renal insufficiency evaluated by estimated glomerular filtration rates in patients scheduled for contrast-enhanced CT

    International Nuclear Information System (INIS)

    Utsunomiya, Daisuke; Yanaga, Yumi; Oda, Seitaro; Namimoto, Tomohiro; Yamashita, Yasuyuki; Awai, Kazuo; Funama, Yoshinori

    2011-01-01

    Background Although pre-existing renal insufficiency (RI) is the most important risk factor for contrast-induced nephropathy (CIN), the background distribution of baseline renal function has not been investigated thoroughly in patients scheduled for contrast-enhanced CT. Purpose To investigate the incidence and severity of baseline RI evaluated by estimated glomerular filtration rates (eGFR) in patients who underwent contrast-enhanced CT at an academic center. Material and Methods A total of 6586 patients (3630 men and 2956 women; mean age 57.0 ± 11.9 years) who underwent contrast-enhanced CT between January and December 2008 were retrospectively studied. Of these, 829 had cardiovascular diseases (CVD), 5116 had oncologic diseases, 178 had diabetes mellitus (DM), and 1572 had chronic liver disease (CLD). The eGFR (mL/min/1.73 m 2 ) was calculated from their serum creatinine level. Mild, moderate-a, moderate-b, and severe RI were recorded at 60 2 at baseline was high in patients with advanced age, CVD and DM and in patients without oncologic disease

  4. PREVAIL: IBM's e-beam technology for next generation lithography

    Science.gov (United States)

    Pfeiffer, Hans C.

    2000-07-01

    PREVAIL - Projection Reduction Exposure with Variable Axis Immersion Lenses represents the high throughput e-beam projection approach to NGL which IBM is pursuing in cooperation with Nikon Corporation as alliance partner. This paper discusses the challenges and accomplishments of the PREVAIL project. The supreme challenge facing all e-beam lithography approaches has been and still is throughput. Since the throughput of e-beam projection systems is severely limited by the available optical field size, the key to success is the ability to overcome this limitation. The PREVAIL technique overcomes field-limiting off-axis aberrations through the use of variable axis lenses, which electronically shift the optical axis simultaneously with the deflected beam so that the beam effectively remains on axis. The resist images obtained with the Proof-of-Concept (POC) system demonstrate that PREVAIL effectively eliminates off- axis aberrations affecting both resolution and placement accuracy of pixels. As part of the POC system a high emittance gun has been developed to provide uniform illumination of the patterned subfield and to fill the large numerical aperture projection optics designed to significantly reduce beam blur caused by Coulomb interaction.

  5. Is the Economic Crisis Challenging the Prevailing Gender Regime?

    DEFF Research Database (Denmark)

    Leschke, Janine; Jepsen, Maria

    2014-01-01

    and analysing the corresponding position of women and men in paid and unpaid work, the paper contains an in-depth discussion of the short- and medium-term policy responses to the crisis. Our analysis shows that independent of the prevailing gender regime, scant public attention has been directed to gender...

  6. Vets prevail online intervention reduces PTSD and depression in veterans with mild-to-moderate symptoms.

    Science.gov (United States)

    Hobfoll, Stevan E; Blais, Rebecca K; Stevens, Natalie R; Walt, Lisa; Gengler, Richard

    2016-01-01

    Despite heightened rates of depression and posttraumatic stress disorder (PTSD) among in Iraq/Afghanistan veterans, the majority of distressed veterans will not receive mental health care. Overcoming barriers to mental health services requires innovative approaches to broaden the reach of evidence-based treatment. The current study examined the efficacy and acceptability of an innovative and dynamic online cognitive-behavioral therapy intervention for PTSD and depression called Vets Prevail. A randomized clinical trial conducted between 2011 and 2013 assessed changes in PTSD and depression in veterans with mild-to-moderate distress. Veterans randomized to Vets Prevail (n = 209) were aged 34.2 ± 7.6 years, mostly male (81.3%), and nonminority (73.7%). Veterans randomized to adjustment as usual (n = 94) were aged 34.7 ± 8.9, mostly male (81.9%), and White (67.0%). Veterans completed the PTSD Checklist-Military Version and the Center for Epidemiological Studies Depression scale (10-item version) postintervention and at 12-week follow-up. Veterans in the Vets Prevail condition reported significantly greater reductions in PTSD, t(250) = 3.24, p = .001 (Mreduction = 5.51, SD = 9.63), and depression, t(252) = 4.37, p = .001 (Mreduction = 2.31, SD = 5.34), at 12-week follow-up compared with veterans in the adjustment as usual condition (PTSD Mreduction = 1.00, SD = 7.32; depression Mreduction = 0.48, SD = 4.95), with moderate effect sizes for PTSD (Cohen's d = 0.42) and depression (Cohen's d = 0.56). Exploratory analysis shows that Vets Prevail may be effective regardless of combat trauma exposure, gender, and ethnic minority status. Vets Prevail circumvents many barriers to care and effectively addresses the dire mental health needs of veterans. (c) 2015 APA, all rights reserved).

  7. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  8. Modified open-access scheduling for new patient evaluations at an academic chronic pain clinic increased patient access to care, but did not materially reduce their mean cancellation rate: A retrospective, observational study.

    Science.gov (United States)

    Sivanesan, Eellan; Lubarsky, David A; Ranasinghe, Chaturani T; Sarantopoulos, Constantine D; Epstein, Richard H

    2017-09-01

    To determine if open-access scheduling would reduce the cancellation rate for new patient evaluations in a chronic pain clinic by at least 50%. Retrospective, observational study using electronic health records. Chronic pain clinic of an academic anesthesia department. All patients scheduled for evaluation or follow-up appointments in the chronic pain clinic between April 1, 2014, and December 31, 2015. Open-access scheduling was instituted in April 2015 with appointments offered on a date of the patient's choosing ≥1 business day after calling, with no limit on the daily number of new patients. Mean cancellation rates for new patients were compared between the 12-month baseline period prior to and for 7months after the change, following an intervening 2-month washout period. The method of batch means (by month) and the 2-sided Student t-test were used; Pnew patient mean cancellation rate decreased from a baseline of 35.7% by 4.2% (95% confidence interval [CI] 1.4% to 6.9%; P=0.005); however, this failed to reach the 50% reduction target of 17.8%. Appointment lag time decreased by 4.7days (95% CI 2.3 to 7.0days, Pnew patient group. More new patients were seen within 1week compared to baseline (50.6% versus 19.1%; Pnew patient visits per month increased from 158.5 to 225.0 (P=0.0004). The cancellation rate and appointment lag times did not decrease for established patient visits, as expected because open-access scheduling was not implemented for this group. Access to care for new chronic pain patients improved with modified open-access scheduling. However, their mean cancellation rate only decreased from 35.7% to 31.5%, making this a marginally effective strategy to reduce cancellations. Copyright © 2017 Elsevier Inc. All rights reserved.

  9. PREVAIL-EPL alpha tool electron optics subsystem

    Science.gov (United States)

    Pfeiffer, Hans C.; Dhaliwal, Rajinder S.; Golladay, Steven D.; Doran, Samuel K.; Gordon, Michael S.; Kendall, Rodney A.; Lieberman, Jon E.; Pinckney, David J.; Quickle, Robert J.; Robinson, Christopher F.; Rockrohr, James D.; Stickel, Werner; Tressler, Eileen V.

    2001-08-01

    The IBM/Nikon alliance is continuing pursuit of an EPL stepper alpha tool based on the PREVAIL technology. This paper provides a status report of the alliance activity with particular focus on the Electron Optical Subsystem developed at IBM. We have previously reported on design features of the PREVAIL alpha system. The new state-of-the-art e-beam lithography concepts have since been reduced to practice and turned into functional building blocks of a production level lithography tool. The electron optical alpha tool subsystem has been designed, build, assembled and tested at IBM's Semiconductor Research and Development Center (SRDC) in East Fishkill, New York. After demonstrating subsystem functionality, the electron optical column and all associated control electronics hardware and software have been shipped during January 2001 to Nikon's facility in Kumagaya, Japan, for integration into the Nikon commercial e-beam stepper alpha tool. Early pre-shipment results obtained with this electron optical subsystem are presented.

  10. Baseline incidence and severity of renal insufficiency evaluated by estimated glomerular filtration rates in patients scheduled for contrast-enhanced CT

    Energy Technology Data Exchange (ETDEWEB)

    Utsunomiya, Daisuke; Yanaga, Yumi; Oda, Seitaro; Namimoto, Tomohiro; Yamashita, Yasuyuki (Dept. of Diagnostic Radiology, Faculty of Life Sciences, Kumamoto Univ., Kumamoto (Japan)), email: utsunomi@kumamoto-u.ac.jp; Awai, Kazuo (Dept. of Diagnostic Radiology, Graduate School of Biomedical Sciences, Hiroshima Univ., Hiroshima (Japan)); Funama, Yoshinori (Dept. of Medical Physics, Faculty of Life Sciences, Kumamoto Univ., Kumamoto (Japan))

    2011-06-15

    Background Although pre-existing renal insufficiency (RI) is the most important risk factor for contrast-induced nephropathy (CIN), the background distribution of baseline renal function has not been investigated thoroughly in patients scheduled for contrast-enhanced CT. Purpose To investigate the incidence and severity of baseline RI evaluated by estimated glomerular filtration rates (eGFR) in patients who underwent contrast-enhanced CT at an academic center. Material and Methods A total of 6586 patients (3630 men and 2956 women; mean age 57.0 +- 11.9 years) who underwent contrast-enhanced CT between January and December 2008 were retrospectively studied. Of these, 829 had cardiovascular diseases (CVD), 5116 had oncologic diseases, 178 had diabetes mellitus (DM), and 1572 had chronic liver disease (CLD). The eGFR (mL/min/1.73 m2) was calculated from their serum creatinine level. Mild, moderate-a, moderate-b, and severe RI were recorded at 60 < =eGFR < 90, 45 < =eGFR < 60, 30 < =eGFR < 45 and eGFR < 30, respectively. Results Of the 6586 patients, 1.6%, 3.7%, 13.7%, and 54.2% were judged to present with severe, moderate-b, moderate-a, and mild RI, respectively. While moderate-b-to-severe RI was recorded in 133 (3.2%) of 4161 patients aged 70 years or less, it was observed in 218 (9.0%) of the 2425 patients who were 71 years or older. Among the 829 CVD patients, 9.9% manifested moderate-b-to-severe- and 73.0% mild-to-moderate-a RI. The corresponding rates were 4.4% and 68.9% for oncologic disease, 16.9% and 61.2% for DM, and 4.8% and 71.5% for CLD patients. By univariate analysis, there was a significant association between moderate-b-to-severe RI and the advanced age, CVD, DM, and non-oncologic disease. Multivariate analysis showed that the advanced age, DM, and non-oncologic disease were statistically associated with moderate-b-to-severe RI. Conclusion The incidence of RI of eGFR < 45mL/min/1.73 m2 at baseline was high in patients with advanced age, CVD and DM and

  11. Mature results of a randomized trial comparing two fractionation schedules of high dose rate endoluminal brachytherapy for the treatment of endobronchial tumors

    International Nuclear Information System (INIS)

    Niemoeller, Olivier M; Pöllinger, Barbara; Niyazi, Maximilian; Corradini, Stefanie; Manapov, Farkhad; Belka, Claus; Huber, Rudolf M

    2013-01-01

    To determine the efficacy of high dose rate endobronchial brachytherapy (HDR-BT) for the treatment of centrally located lung tumors, two different fractionation schedules were compared regarding local tumor response, side effects and survival. Mature retrospective results with longer follow-up and more patients were analyzed. Initial results were published by Huber et al. in 1995. 142 patients with advanced, centrally located malignant tumors with preferential endoluminal growth were randomized to receive 4 fractions of 3.8 Gy (time interval: 1 week, n = 60, group I) or 2 fractions of 7.2 Gy (time interval: 3 weeks, n = 82, group II) endobronchial HDR-BT. Age, gender, tumor stage, Karnofsky Performance Score and histology were equally distributed between both groups. Local tumor response with 2 fractions of 7.2 Gy was significantly higher as compared to 4 fractions of 3.8 Gy (median 12 vs. 6 weeks; p ≤ 0.015). Median survival was similar in both groups (19 weeks in the 4 fractions group vs. 18 weeks in the 2 fractions group). Fatal hemoptysis was less frequent following irradiation with 2 × 7.2 Gy than with 4 × 3.8 Gy, although the difference did not achieve statistical significance (12.2% vs. 18.3%, respectively. p = 0,345). Patients presenting with squamous cell carcinoma were at higher risk of bleeding compared to other histology (21.9% vs. 9%, p = 0,035). Multivariate analysis with regard to overall survival, revealed histology (p = 0.02), Karnofsky Performance Score (p < 0.0001) and response to therapy (p < 0.0001) as significant prognostic factors. For patients showing complete response the median survival was 57 weeks, while for patients with progressive disease median survival time was 8 weeks, p < 0.0001. The KPS at the start of the treatment was significantly correlated with survival. Patients presenting with a KPS ≤ 60 at the start had a significantly (p = 0,032) shorter survival time (10 weeks) than patients with a KPS > 60 (29 weeks). Moreover

  12. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  13. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  14. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  15. Population Causes and Consequences of Leading Chronic Diseases: A Comparative Analysis of Prevailing Explanations

    Science.gov (United States)

    Stuckler, David

    2008-01-01

    Context The mortality numbers and rates of chronic disease are rising faster in developing than in developed countries. This article compares prevailing explanations of population chronic disease trends with theoretical and empirical models of population chronic disease epidemiology and assesses some economic consequences of the growth of chronic diseases in developing countries based on the experiences of developed countries. Methods Four decades of male mortality rates of cardiovascular and chronic noncommunicable diseases were regressed on changes in and levels of country income per capita, market integration, foreign direct investment, urbanization rates, and population aging in fifty-six countries for which comparative data were available. Neoclassical economic growth models were used to estimate the effect of the mortality rates of chronic noncommunicable diseases on economic growth in high-income OECD countries. Findings Processes of economic growth, market integration, foreign direct investment, and urbanization were significant determinants of long-term changes in mortality rates of heart disease and chronic noncommunicable disease, and the observed relationships with these social and economic factors were roughly three times stronger than the relationships with the population's aging. In low-income countries, higher levels of country income per capita, population urbanization, foreign direct investment, and market integration were associated with greater mortality rates of heart disease and chronic noncommunicable disease, less increased or sometimes reduced rates in middle-income countries, and decreased rates in high-income countries. Each 10 percent increase in the working-age mortality rates of chronic noncommunicable disease decreased economic growth rates by close to a half percent. Conclusions Macrosocial and macroeconomic forces are major determinants of population rises in chronic disease mortality, and some prevailing demographic explanations

  16. Population causes and consequences of leading chronic diseases: a comparative analysis of prevailing explanations.

    Science.gov (United States)

    Stuckler, David

    2008-06-01

    The mortality numbers and rates of chronic disease are rising faster in developing than in developed countries. This article compares prevailing explanations of population chronic disease trends with theoretical and empirical models of population chronic disease epidemiology and assesses some economic consequences of the growth of chronic diseases in developing countries based on the experiences of developed countries. Four decades of male mortality rates of cardiovascular and chronic noncommunicable diseases were regressed on changes in and levels of country income per capita, market integration, foreign direct investment, urbanization rates, and population aging in fifty-six countries for which comparative data were available. Neoclassical economic growth models were used to estimate the effect of the mortality rates of chronic noncommunicable diseases on economic growth in high-income OECD countries. Processes of economic growth, market integration, foreign direct investment, and urbanization were significant determinants of long-term changes in mortality rates of heart disease and chronic noncommunicable disease, and the observed relationships with these social and economic factors were roughly three times stronger than the relationships with the population's aging. In low-income countries, higher levels of country income per capita, population urbanization, foreign direct investment, and market integration were associated with greater mortality rates of heart disease and chronic noncommunicable disease, less increased or sometimes reduced rates in middle-income countries, and decreased rates in high-income countries. Each 10 percent increase in the working-age mortality rates of chronic noncommunicable disease decreased economic growth rates by close to a half percent. Macrosocial and macroeconomic forces are major determinants of population rises in chronic disease mortality, and some prevailing demographic explanations, such as population aging, are

  17. Evaluate prevailing climate change on Great Lakes water levels

    International Nuclear Information System (INIS)

    Islam, M.

    2009-01-01

    'Full text:'In this paper, results of a comprehensive water mass balance modeling for the Great Lakes against prevailing and different anticipated climate change scenarios would be presented. Modeling is done in evaluating the changes in the lake storages and then changes in the lake's water level considering present condition, uncertainty and variability of climate and hydrologic conditions in the future. Inflow-outflow and consequent changes in the five Great Lake's storages are simulated for the last 30 years and then projected to evaluate the changes in the lake storages for the next 50 years. From the predicted changes in the lake storage data, water level is calculated using mass to linear conversion equation. Modeling and analysis results are expected to be helpful in understanding the possible impacts of the climate change on the Great Lakes water environment and preparing strategic plan for the sustainable management of lake's water resources. From the recent past, it is observed that there is a depleting trend in the lakes water level and hence there is a potential threat to lake's water environment and uncertainty of the availability of quality and quantity of water for the future generations, especially against prevailing and anticipated climate changes. For this reason, it is an urgent issue of understanding and quantifying the potential impacts of climate change on the Great Lake's water levels and storages. (author)

  18. Effects of Prevailing Winds on Turbidity of a Shallow Estuary

    Directory of Open Access Journals (Sweden)

    Hyun Jung Cho

    2007-06-01

    Full Text Available Estuarine waters are generally more turbid than lakes or marine waters due to greater algal mass and continual re-suspension of sediments. The varying effects of diurnal and seasonal prevailing winds on the turbidity condition of a wind-dominated estuary were investigated by spatial and statistical analyses of wind direction, water level, turbidity, chlorophyll a, and PAR (Photosynthetically Active Radiation collected in Lake Pontchartrain, Louisiana, USA. The prolonged prevailing winds were responsible for the long-term, large-scale turbidity pattern of the estuary, whereas the short-term changes in wind direction had differential effects on turbidity and water level in varying locations. There were temporal and spatial changes in the relationship between vertical light attenuation coefficient (Kd and turbidity, which indicate difference in phytoplankton and color also affect Kd. This study demonstrates that the effect of wind on turbidity and water level on different shores can be identified through system-specific analyses of turbidity patterns.

  19. Farmers prevailing perception profiles regarding GM crops: A classification proposal.

    Science.gov (United States)

    Almeida, Carla; Massarani, Luisa

    2018-04-01

    Genetically modified organisms have been at the centre of a major public controversy, involving different interests and actors. While much attention has been devoted to consumer views on genetically modified food, there have been few attempts to understand the perceptions of genetically modified technology among farmers. By investigating perceptions of genetically modified organisms among Brazilian farmers, we intend to contribute towards filling this gap and thereby add the views of this stakeholder group to the genetically modified debate. A comparative analysis of our data and data from other studies indicate there is a complex variety of views on genetically modified organisms among farmers. Despite this diversity, we found variations in such views occur within limited parameters, concerned principally with expectations or concrete experiences regarding the advantages of genetically modified crops, perceptions of risks associated with them, and ethical questions they raise. We then propose a classification of prevailing profiles to represent the spectrum of perceptions of genetically modified organisms among farmers.

  20. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  1. 5-Year Outcomes After Left Atrial Appendage Closure: From the PREVAIL and PROTECT AF Trials.

    Science.gov (United States)

    Reddy, Vivek Y; Doshi, Shephal K; Kar, Saibal; Gibson, Douglas N; Price, Matthew J; Huber, Kenneth; Horton, Rodney P; Buchbinder, Maurice; Neuzil, Petr; Gordon, Nicole T; Holmes, David R

    2017-12-19

    The PROTECT AF (WATCHMAN Left Atrial Appendage System for Embolic Protection in Patients With Atrial Fibrillation) trial demonstrated that left atrial appendage closure (LAAC) with the Watchman device (Boston Scientific, St. Paul, Minnesota) was equivalent to warfarin for preventing stroke in atrial fibrillation, but had a high rate of complications. In a second randomized trial, PREVAIL (Evaluation of the WATCHMAN LAA Closure Device in Patients With Atrial Fibrillation Versus Long Term Warfarin Therapy), the complication rate was low. The warfarin cohort experienced an unexpectedly low ischemic stroke rate, rendering the efficacy endpoints inconclusive. However, these outcomes were based on relatively few patients followed for a relatively short time. The final results of the PREVAIL trial, both alone and as part of a patient-level meta-analysis with the PROTECT AF trial, are reported with patients in both trials followed for 5 years. PREVAIL and PROTECT AF are prospective randomized clinical trials with patients randomized 2:1 to LAAC or warfarin; together, they enrolled 1,114 patients for 4,343 patient-years. Analyses are by intention-to-treat, and rates are events per 100 patient-years. For the PREVAIL trial, the first composite coprimary endpoint of stroke, systemic embolism (SE), or cardiovascular/unexplained death did not achieve noninferiority (posterior probability for noninferiority = 88.4%), whereas the second coprimary endpoint of post-procedure ischemic stroke/SE did achieve noninferiority (posterior probability for noninferiority = 97.5%); the warfarin arm maintained an unusually low ischemic stroke rate (0.73%). In the meta-analysis, the composite endpoint was similar between groups (hazard ratio [HR]: 0.820; p = 0.27), as were all-stroke/SE (HR: 0.961; p = 0.87). The ischemic stroke/SE rate was numerically higher with LAAC, but this difference did not reach statistical significance (HR: 1.71; p = 0.080). However, differences in

  2. 29 CFR 2704.202 - Contents of application-where the applicant has prevailed.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Contents of application-where the applicant has prevailed... Information Required From Applicants § 2704.202 Contents of application—where the applicant has prevailed. (a) An application for an award under § 2704.105(a) shall show that the applicant has prevailed in a...

  3. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  4. Stittco Utilities Man Ltd. application for an interim ex parte order under section 45 of the Public Utilities Board Act for the approval of a change to its schedule of rates

    Energy Technology Data Exchange (ETDEWEB)

    1990-11-15

    Stittco Utilities, a company distributing propane in Manitoba, applied to the Manitoba Public Utilities Board for an interim order authorizing an increase in rates for all domestic and commercial customers in 3 Manitoba localities. The rate increase requested is based on the increase in the commodity price of propane and related changes in freight rates. If approved, the average rate will increase by ca 28% for residential customers and 27% for commercial customers. With the expectation that the price of propane would decrease in the near future, Stittco proposed to base its rates on a propane price lower than the current market price, in an effort to retain existing customers. Stittco also proposed to establish a variance account, in which the difference between the cost of propane built into the rates and the actual market price would be accumulated. From time to time Stittco would apply to adjust the rate schedule to refund overages or collect shortfalls contained in this variance account. It is Stittco's intention to cancel its new propane supply contract when propane prices stabilize and enter into a new fixed-price contract. Stittco would then apply for a new rate schedule based on the long-term price of propane. Based on the evidence, the Board decided that a prima facie case has been made showing a 105% increase in Stittco's cost of product and delivery, and that this increase should be passed through to Stittco customers effective November 16, 1990. Status reports were required for the variance account starting December 1990.

  5. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  6. Does undernutrition still prevail among nursing home residents?

    Science.gov (United States)

    Törmä, Johanna; Winblad, Ulrika; Cederholm, Tommy; Saletti, Anja

    2013-08-01

    During recent years public awareness about malnutrition has increased and collective initiatives have been undertaken. Simultaneously, the number of older adults is increasing, and the elderly care has been placed under pressure. The aim was to assess the nutritional situation and one-year mortality among nursing home (NH) residents, and compare with historical data. Mini Nutritional Assessment-Short Form (MNA-SF), ADL Barthel Index (BI), Short Portable Mental Status Questionnaire (SPMSQ), EQ-5D, Charlson Comorbidity Index (CCI), and blood samples were collected from 172 NH residents (86.3 ± 8 years, 70% women). Mortality data was taken from NH records. Nutritional data from 166 NH residents (83.8 ± 8 years, 61% women) examined in 1996 was retrieved for historical comparison. The prevalence of malnutrition was 30%, as compared to 71% in the historical data set, corresponding to a present average body mass index of 23.7 ± 5.1 compared with 22.3 ± 4.2 kg/m(2) (p prevails and is associated with deteriorated cognition, function and increased mortality. A possible improvement in nutritional status in NH residents over time was observed. Copyright © 2012 Elsevier Ltd and European Society for Clinical Nutrition and Metabolism. All rights reserved.

  7. Familiar units prevail over statistical cues in word segmentation.

    Science.gov (United States)

    Poulin-Charronnat, Bénédicte; Perruchet, Pierre; Tillmann, Barbara; Peereman, Ronald

    2017-09-01

    In language acquisition research, the prevailing position is that listeners exploit statistical cues, in particular transitional probabilities between syllables, to discover words of a language. However, other cues are also involved in word discovery. Assessing the weight learners give to these different cues leads to a better understanding of the processes underlying speech segmentation. The present study evaluated whether adult learners preferentially used known units or statistical cues for segmenting continuous speech. Before the exposure phase, participants were familiarized with part-words of a three-word artificial language. This design allowed the dissociation of the influence of statistical cues and familiar units, with statistical cues favoring word segmentation and familiar units favoring (nonoptimal) part-word segmentation. In Experiment 1, performance in a two-alternative forced choice (2AFC) task between words and part-words revealed part-word segmentation (even though part-words were less cohesive in terms of transitional probabilities and less frequent than words). By contrast, an unfamiliarized group exhibited word segmentation, as usually observed in standard conditions. Experiment 2 used a syllable-detection task to remove the likely contamination of performance by memory and strategy effects in the 2AFC task. Overall, the results suggest that familiar units overrode statistical cues, ultimately questioning the need for computation mechanisms of transitional probabilities (TPs) in natural language speech segmentation.

  8. Genetics of Schizophrenia: Historical Insights and Prevailing Evidence.

    Science.gov (United States)

    van de Leemput, J; Hess, J L; Glatt, S J; Tsuang, M T

    2016-01-01

    Schizophrenia's (SZ's) heritability and familial transmission have been known for several decades; however, despite the clear evidence for a genetic component, it has been very difficult to pinpoint specific causative genes. Even so genetic studies have taught us a lot, even in the pregenomic era, about the molecular underpinnings and disease-relevant pathways. Recurring themes emerged revealing the involvement of neurodevelopmental processes, glutamate regulation, and immune system differential activation in SZ etiology. The recent emergence of epigenetic studies aimed at shedding light on the biological mechanisms underlying SZ has provided another layer of information in the investigation of gene and environment interactions. However, this epigenetic insight also brings forth another layer of complexity to the (epi)genomic landscape such as interactions between genetic variants, epigenetic marks-including cross-talk between DNA methylation and histone modification processes-, gene expression regulation, and environmental influences. In this review, we seek to synthesize perspectives, including limitations and obstacles yet to overcome, from genetic and epigenetic literature on SZ through a qualitative review of risk factors and prevailing hypotheses. Encouraged by the findings of both genetic and epigenetic studies to date, as well as the continued development of new technologies to collect and interpret large-scale studies, we are left with a positive outlook for the future of elucidating the molecular genetic mechanisms underlying SZ and other complex neuropsychiatric disorders. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  10. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  11. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  12. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  13. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  14. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  15. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  16. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  17. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  18. Economic impact of enoxaparin after acute ischemic stroke based on PREVAIL.

    Science.gov (United States)

    Pineo, Graham; Lin, Jay; Stern, Lee; Subrahmanian, Tarun; Annemans, Lieven

    2011-04-01

    The efficacy and safety of low-molecular-weight heparins (LMWHs) versus unfractionated heparin (UFH) has been demonstrated for the prevention of venous thromboembolism (VTE) after acute ischemic stroke. Few data exist regarding the economic impact of LMWHs versus UFH in this population. A decision-analytic model was constructed using clinical information from the Prevention of VTE after Acute Ischemic stroke with LMWH Enoxaparin (PREVAIL) study, and drug costs and mean Centers for Medicare & Medicaid Services event costs. When considering the total cost of events and drugs, enoxaparin was associated with cost-savings of $895 per patient compared with UFH ($2018 vs $2913). Findings were retained within the univariate and multivariate analyses. From a payer perspective, enoxaparin was cost-effective compared with UFH in patients with acute ischemic stroke. The difference was driven by the lower clinical event rates with enoxaparin. Use of enoxaparin may help to reduce the clinical and economic burden of VTE.

  19. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  20. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  1. Tomato yield, biomass accumulation, root distribution and irrigation water use efficiency on a sandy soil, as affected by nitrogen rate and irrigation scheduling

    NARCIS (Netherlands)

    Zotarelli, L.; Scholberg, J.M.S.; Dukes, M.D.; Munoz-Carpena, R.; Icerman, J.

    2009-01-01

    Florida is the largest producer of fresh-market tomatoes in the United States. Production areas are typically intensively managed with high inputs of fertilizer and irrigation. The objectives of this 3-year field study were to evaluate the interaction between N-fertilizer rates and irrigation

  2. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  3. 75 FR 70616 - Prevailing Rate Systems; Redefinition of the Madison, WI, and Southwestern Wisconsin Appropriated...

    Science.gov (United States)

    2010-11-18

    ... best match the counties proposed for redefinition to a nearby FWS survey area. No other changes are... Director for Pay and Leave, Employee Services, U.S. Office of Personnel Management, Room 7H31, 1900 E Street, NW., Washington, DC 20415-8200; e-mail pay-performance[email protected] ; or FAX: (202) 606- 4264...

  4. 76 FR 70321 - Prevailing Rate Systems; Abolishment of Cumberland, ME, as a Nonappropriated Fund Federal Wage...

    Science.gov (United States)

    2011-11-14

    ... Cumberland, ME, as a Nonappropriated Fund Federal Wage System Wage Area AGENCY: U.S. Office of Personnel... abolish the Cumberland, Maine, nonappropriated fund (NAF) Federal Wage System (FWS) wage area and redefine Cumberland, Kennebec, and Penobscot Counties, ME, to the York, ME, NAF wage area. Aroostook, Hancock, Knox...

  5. 78 FR 58153 - Prevailing Rate Systems; North American Industry Classification System Based Federal Wage System...

    Science.gov (United States)

    2013-09-23

    ... American Industry Classification System Based Federal Wage System Wage Surveys AGENCY: U.S. Office of... in Federal Wage System wage survey industry regulations with the 2012 NAICS revisions published by.... Applicability date: This rule applies for local wage surveys beginning on or after February 21, 2014. FOR...

  6. 76 FR 53045 - Prevailing Rate Systems; Abolishment of Monmouth, NJ, as a Nonappropriated Fund Federal Wage...

    Science.gov (United States)

    2011-08-25

    ... Monmouth, NJ, as a Nonappropriated Fund Federal Wage System Wage Area AGENCY: U.S. Office of Personnel... Wage System (FWS) wage area and redefine Monmouth County, NJ, to the Burlington, NJ, NAF wage area. These changes are necessary because the closure of Fort Monmouth will leave the Monmouth wage area...

  7. 77 FR 11383 - Prevailing Rate Systems; Abolishment of Monmouth, NJ, as a Nonappropriated Fund Federal Wage...

    Science.gov (United States)

    2012-02-27

    ... Monmouth, NJ, as a Nonappropriated Fund Federal Wage System Wage Area AGENCY: U.S. Office of Personnel... abolish the Monmouth, New Jersey, nonappropriated fund (NAF) Federal Wage System (FWS) wage area and redefine Monmouth County, NJ, to the Burlington, NJ, NAF wage area. These changes are necessary because the...

  8. 75 FR 49351 - Prevailing Rate Systems; Nonappropriated Fund Wage and Survey Areas

    Science.gov (United States)

    2010-08-13

    ... Jersey: Atlantic Cape May Ocean Salem Monmouth Survey Area New Jersey: Monmouth Area of Application...: Alabama: Mobile Mississippi: Forest Jackson Lauderdale Survey Area Mississippi: Lauderdale Area of...

  9. 75 FR 45557 - Prevailing Rate Systems; Definition of Tulsa County, OK, and Angelina County, TX, to...

    Science.gov (United States)

    2010-08-03

    .... Veterans Canteen Service (VCS) now operates franchise coffee bars, staffed with NAF employees, at..., Government employees, Reporting and recordkeeping requirements, Wages. U.S. Office of Personnel Management...

  10. 75 FR 17316 - Prevailing Rate Systems; Nonappropriated Fund Wage and Survey Areas

    Science.gov (United States)

    2010-04-06

    ... Lake Survey Area Illinois: Lake Area of Application. Survey area plus: Illinois: Cook Rock Island...) Aguadilla Bayamon Ceiba Isabela Ponce Salinas Toa Baja Vieques U.S. Virgin Islands: St. Croix St. Thomas...

  11. 76 FR 31785 - Prevailing Rate Systems; Abolishment of Cumberland, ME, as a Nonappropriated Fund Federal Wage...

    Science.gov (United States)

    2011-06-02

    ... Exchange, 17 employees at Morale, Welfare, and Recreation, and 2 employees at the Coast Guard Exchange... comments on or before July 5, 2011. Applicability date: FWS employees remaining in the Cumberland wage area... Associate Director for Pay and Leave, Employee Services, U.S. Office of Personnel Management, Room 7H31...

  12. 77 FR 28471 - Prevailing Rate Systems; Abolishment of Montgomery, PA, as a Nonappropriated Fund Federal Wage...

    Science.gov (United States)

    2012-05-15

    ... minimum of 26 NAF wage employees in the survey area, the local activity has the capability to host annual... County from the wage area definition. There are no longer NAF FWS employees working in Bucks County... Montgomery, PA, as a Nonappropriated Fund Federal Wage System Wage Area AGENCY: U.S. Office of Personnel...

  13. 7 CFR 27.35 - Lower class of two samples to prevail.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Lower class of two samples to prevail. 27.35 Section 27.35 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE... Micronaire Determinations § 27.35 Lower class of two samples to prevail. In case a sample drawn from one...

  14. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  15. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  16. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  17. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  18. Comparison of Different Fractionation Schedules Toward a Single Fraction in High-Dose-Rate Brachytherapy as Monotherapy for Low-Risk Prostate Cancer Using 3-Dimensional Radiobiological Models

    Energy Technology Data Exchange (ETDEWEB)

    Mavroidis, Panayiotis, E-mail: mavroidis@uthscsa.edu [Department of Radiation Oncology, University of Texas Health Sciences Center, San Antonio, Texas (United States); Department of Medical Radiation Physics, Karolinska Institutet and Stockholm University, Stockholm (Sweden); Milickovic, Natasa [Department of Medical Physics and Engineering, Strahlenklinik, Klinikum Offenbach GmbH, Offenbach (Germany); Cruz, Wilbert F. [Department of Radiation Oncology, University of Texas Health Sciences Center, San Antonio, Texas (United States); Tselis, Nikolaos [Strahlenklinik, Klinikum Offenbach GmbH, Offenbach (Germany); Karabis, Andreas [Pi-Medical Ltd., Athens (Greece); Stathakis, Sotirios; Papanikolaou, Nikos [Department of Radiation Oncology, University of Texas Health Sciences Center, San Antonio, Texas (United States); Zamboglou, Nikolaos [Strahlenklinik, Klinikum Offenbach GmbH, Offenbach (Germany); Baltas, Dimos [Department of Medical Physics and Engineering, Strahlenklinik, Klinikum Offenbach GmbH, Offenbach (Germany); Nuclear and Particle Physics Section, Physics Department, University of Athens, Athens (Greece)

    2014-01-01

    Purpose: The aim of the present study was the investigation of different fractionation schemes to estimate their clinical impact. For this purpose, widely applied radiobiological models and dosimetric measures were used to associate their results with clinical findings. Methods and Materials: The dose distributions of 12 clinical high-dose-rate brachytherapy implants for prostate were evaluated in relation to different fractionation schemes. The fractionation schemes compared were: (1) 1 fraction of 20 Gy; (2) 2 fractions of 14 Gy; (3) 3 fractions of 11 Gy; and (4) 4 fractions of 9.5 Gy. The clinical effectiveness of the different fractionation schemes was estimated through the complication-free tumor control probability (P{sub +}), the biologically effective uniform dose, and the generalized equivalent uniform dose index. Results: For the different fractionation schemes, the tumor control probabilities were 98.5% in 1 × 20 Gy, 98.6% in 2 × 14 Gy, 97.5% in 3 × 11 Gy, and 97.8% in 4 × 9.5 Gy. The corresponding P{sub +} values were 88.8% in 1 × 20 Gy, 83.9% in 2 × 14 Gy, 86.0% in 3 × 11 Gy, and 82.3% in 4 × 9.5 Gy. With use of the fractionation scheme 4 × 9.5 Gy as reference, the isoeffective schemes regarding tumor control for 1, 2, and 3 fractions were 1 × 19.68 Gy, 2 × 13.75 Gy, and 3 × 11.05 Gy. The optimum fractionation schemes for 1, 2, 3, and 4 fractions were 1 × 19.16 Gy with a P{sub +} of 91.8%, 2 × 13.2 Gy with a P{sub +} of 89.6%, 3 × 10.6 Gy with a P{sub +} of 88.4%, and 4 × 9.02 Gy with a P{sub +} of 86.9%. Conclusions: Among the fractionation schemes 1 × 20 Gy, 2 × 14 Gy, 3 × 11 Gy, and 4 × 9.5 Gy, the first scheme was more effective in terms of P{sub +}. After performance of a radiobiological optimization, it was shown that a single fraction of 19.2 to 19.7 Gy (average 19.5 Gy) should produce at least the same benefit as that given by the 4 × 9.5 Gy scheme, and it should reduce the expected total complication probability by

  19. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    Science.gov (United States)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.

  20. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  1. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  2. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  3. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    month; the necessary rate of a month; the quantities to be completed before half period of the project; the quantities to be achieved before the cold function test. Due to a lot of documents and equipment in LANP, it is impossible to present their supply dates one by one in the level 2 project schedule. The rules, in reference to the corresponding construction starting dates, were given to define the supply dates. The good practices of construction schedule control are presented, including draft of a construction program, performance evaluation, specific coordination meeting and Work Load Point application. The schedule control culture is described, that is one core, two criteria, three control mechanisms, four resources to be secured. (author)

  4. Sex, plasma lipoproteins, and atherosclerosis: prevailing assumptions and outstanding questions.

    Science.gov (United States)

    Godsland, I F; Wynn, V; Crook, D; Miller, N E

    1987-12-01

    We review the hypothesis that the incidence of coronary heart disease (CHD) is higher in men than in women due to differences in plasma lipoprotein risk factors between the sexes. Men and women appear to be equally susceptible to the effects of lipoprotein risk factors for CHD, and the difference between the sexes in lipoprotein risk factors for CHD appears to be consistent with their being, at least in part, responsible for the sex difference in CHD. This is apparent both when men and women of equal age are compared, and when age-related variations in the sex differences in plasma lipoproteins and CHD are considered. Differences between the sexes in lipoprotein concentrations are still present when sex differences in adiposity, cigarette smoking, physical activity, and diet are taken into account. Evidence relating these sex differences in CHD and lipoproteins to the effects of sex hormones is critically examined. It is commonly accepted that androgens induce changes in lipoprotein concentrations that would predispose towards CHD, whereas estrogens are held to have opposite effects. However, much of the evidence for this comes from studies of changes associated with administration of synthetic gonadal steroids or with changes in gonadal function. Studies of differences in lipoprotein metabolism in normal men and women are extremely limited. In males high-density lipoprotein (HDL) cholesterol levels fall at puberty, correlating with the rise in plasma testosterone concentrations. In females, HDL levels do not change at puberty, despite the rise in estrogen concentrations. Evidence for lipoprotein changes during the menopause, when estrogen levels decline, is equivocal. Similarly, the evidence for an increase in CHD incidence at the menopause is inconclusive. National mortality data indicate that the decreasing sex difference in CHD after 50 years of age is due to a declining rate of increase in men rather than to an acceleration in CHD incidence in women. In men

  5. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  6. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  7. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  8. CERN confirms LHC schedule

    CERN Document Server

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  9. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  10. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  11. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  12. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  13. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  14. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  15. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  16. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  17. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  18. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  19. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  20. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  1. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  2. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  3. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  4. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  5. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  6. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  7. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  8. Influences on Cocaine Tolerance Assessed under a Multiple Conjunctive Schedule of Reinforcement

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N.

    2009-01-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the…

  9. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  10. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  11. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  12. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  13. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  14. Weighted-SNR-based fair scheduling for uplink OFDMA

    KAUST Repository

    Ma, Yao; Leith, Alex; Alouini, Mohamed-Slim; (Sherman) Shen X., Xuemin

    2009-01-01

    rates for different users. The offline optimization technique requires to know the channel distribution information (CDI) at the scheduler. The online method uses the weight adaption combined with individual user rate tracking, which avoids the need

  15. Prevailing Wage Regulations and School Construction Costs: Evidence from British Columbia.

    Science.gov (United States)

    Bilginsoy, Cihan; Philips, Peter

    2000-01-01

    Examines effects of prevailing wage laws on school construction costs, using final cost data from six British Columbia school districts. When controlling for factors such as construction business cycle, number of competitors, and school type, there was no significant unit cost change following the Skill Development and Fair Wage Policy Act.…

  16. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  17. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  18. Dynamic Scheduling for Cloud Reliability using Transportation Problem

    OpenAIRE

    P. Balasubramanie; S. K. Senthil Kumar

    2012-01-01

    Problem statement: Cloud is purely a dynamic environment and the existing task scheduling algorithms are mostly static and considered various parameters like time, cost, make span, speed, scalability, throughput, resource utilization, scheduling success rate and so on. Available scheduling algorithms are mostly heuristic in nature and more complex, time consuming and does not consider reliability and availability of the cloud computing environment. Therefore there is a need to implement a sch...

  19. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  20. 76 FR 10233 - Schedule of Water Charges

    Science.gov (United States)

    2011-02-24

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 420 Schedule of Water Charges AGENCY: Delaware River..., Part III, Basin Regulations--Water Supply Charges. Accordingly, the Commission's water charging rates..., 2011. Effective Date: February 24, 2011. FOR FURTHER INFORMATION CONTACT: For questions about the water...

  1. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  2. Review on the prevailing methods for the prediction of potential rock burst / rock spalling in tunnels

    OpenAIRE

    Panthi, Krishna Kanta

    2017-01-01

    Rock burst / rock spalling is among the prevailing stability challenges, which can be met while tunneling through hard rock mass. Especially, this is very relevant for the mountainous country like Norway where hard rock is dominating and many road, railway and hydropower tunnels have to be aligned deep into the mountain with steep valley slope topography. Tunnels passing beneath deep rock cover (overburden), in general, are subjected to high in-situ stresses. If the rock mass is relatively un...

  3. Nuclear energy is not the prevailing energy in the French energetic mix

    International Nuclear Information System (INIS)

    Destais, G.

    2011-01-01

    The author first shows that the share of nuclear energy in the French electricity production is in fact of 76% (and not 80% as usually said), and that the share of this energy in the final electricity consumption was 69% in 2009. She also outlines that nuclear electricity is only 16,5% of the total final energy consumption in France in 2009, whereas oil still prevails with 42%

  4. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  5. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors.

    Science.gov (United States)

    Zilanawala, Afshin

    2017-06-01

    Objectives Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9-5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Cohort Study (n = 17,397), to investigate the association between types of maternal nonstandard work (evening, night, away from home overnight, and weekends) and breastfeeding behaviors. Results In unadjusted models, exposure to evening shifts was associated with greater odds of breastfeeding initiation (OR 1.71, CI 1.50-1.94) and greater odds of short (OR 1.55, CI 1.32-1.81), intermediate (OR 2.01, CI 1.64-2.47), prolonged partial duration (OR 2.20, CI 1.78-2.72), and prolonged exclusive duration (OR 1.53, CI 1.29-1.82), compared with mothers who were unemployed and those who work other types of nonstandard shifts. Socioeconomic advantage of mothers working evening schedules largely explained the higher odds of breastfeeding initiation and duration. Conclusions Socioeconomic characteristics explain more breastfeeding behaviors among mothers working evening shifts. Policy interventions to increase breastfeeding initiation and duration should consider the timing of maternal work schedules.

  6. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  7. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  8. Channel access delay and buffer distribution of two-user opportunistic scheduling schemes in wireless networks

    KAUST Repository

    Hossain, Md Jahangir; Alouini, Mohamed-Slim; Bhargava, Vijay K.

    2010-01-01

    In our earlier works, we proposed rate adaptive hierarchical modulation-assisted two-best user opportunistic scheduling (TBS) and hybrid two-user scheduling (HTS) schemes. The proposed schemes are innovative in the sense that they include a second

  9. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  10. Joint opportunistic scheduling and network coding for bidirectional relay channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-07-01

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users\\' transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited. © 2013 IEEE.

  11. Cost-Effectiveness of Percutaneous Closure of the Left Atrial Appendage in Atrial Fibrillation Based on Results From PROTECT AF Versus PREVAIL.

    Science.gov (United States)

    Freeman, James V; Hutton, David W; Barnes, Geoffrey D; Zhu, Ruo P; Owens, Douglas K; Garber, Alan M; Go, Alan S; Hlatky, Mark A; Heidenreich, Paul A; Wang, Paul J; Al-Ahmad, Amin; Turakhia, Mintu P

    2016-06-01

    Randomized trials of left atrial appendage (LAA) closure with the Watchman device have shown varying results, and its cost effectiveness compared with anticoagulation has not been evaluated using all available contemporary trial data. We used a Markov decision model to estimate lifetime quality-adjusted survival, costs, and cost effectiveness of LAA closure with Watchman, compared directly with warfarin and indirectly with dabigatran, using data from the long-term (mean 3.8 year) follow-up of Percutaneous Closure of the Left Atrial Appendage Versus Warfarin Therapy for Prevention of Stroke in Patients With Atrial Fibrillation (PROTECT AF) and Prospective Randomized Evaluation of the Watchman LAA Closure Device in Patients With Atrial Fibrillation (PREVAIL) randomized trials. Using data from PROTECT AF, the incremental cost-effectiveness ratios compared with warfarin and dabigatran were $20 486 and $23 422 per quality-adjusted life year, respectively. Using data from PREVAIL, LAA closure was dominated by warfarin and dabigatran, meaning that it was less effective (8.44, 8.54, and 8.59 quality-adjusted life years, respectively) and more costly. At a willingness-to-pay threshold of $50 000 per quality-adjusted life year, LAA closure was cost effective 90% and 9% of the time under PROTECT AF and PREVAIL assumptions, respectively. These results were sensitive to the rates of ischemic stroke and intracranial hemorrhage for LAA closure and medical anticoagulation. Using data from the PROTECT AF trial, LAA closure with the Watchman device was cost effective; using PREVAIL trial data, Watchman was more costly and less effective than warfarin and dabigatran. PROTECT AF enrolled more patients and has substantially longer follow-up time, allowing greater statistical certainty with the cost-effectiveness results. However, longer-term trial results and postmarketing surveillance of major adverse events will be vital to determining the value of the Watchman in clinical

  12. Cost-Effectiveness of Percutaneous Closure of the Left Atrial Appendage in Atrial Fibrillation Based on Results from PROTECT AF vs. PREVAIL

    Science.gov (United States)

    Freeman, James V.; Hutton, David W.; Barnes, Geoffrey D.; Zhu, Ruo P.; Owens, Douglas K.; Garber, Alan M.; Go, Alan S.; Hlatky, Mark A.; Heidenreich, Paul A.; Wang, Paul J.; Al-Ahmad, Amin; Turakhia, Mintu P.

    2016-01-01

    Background Randomized trials of left atrial appendage (LAA) closure with the Watchman device have shown varying results, and its cost-effectiveness compared to anticoagulation has not been evaluated using all available contemporary trial data. Methods and Results We used a Markov decision model to estimate lifetime quality-adjusted survival, costs, and cost-effectiveness of LAA closure with Watchman, compared directly with warfarin and indirectly with dabigatran, using data from the long-term (mean 3.8 year) follow-up of PROTECT AF and PREVAIL randomized trials. Using data from PROTECT AF, the incremental cost-effectiveness ratios (ICER) compared to warfarin and dabigatran were $20,486 and $23,422 per quality adjusted life year (QALY), respectively. Using data from PREVAIL, LAA closure was dominated by warfarin and dabigatran, meaning that it was less effective (8.44, 8.54, and 8.59 QALYs, respectively) and more costly. At a willingness-to-pay-threshold of $50,000 per QALY, LAA closure was cost-effective 90% and 9% of the time under PROTECT AF and PREVAIL assumptions, respectively. These results were sensitive to the rates of ischemic stroke and intracranial hemorrhage for LAA closure and medical anticoagulation. Conclusions Using data from the PROTECT AF trial, LAA closure with the Watchman device was cost-effective; using PREVAIL trial data, Watchman was more costly and less effective than warfarin and dabigatran. PROTECT AF enrolled more patients and has substantially longer follow-up time, allowing greater statistical certainty with the cost-effectiveness results. However, longer term trial results and post-marketing surveillance of major adverse events will be vital to determining the value of the Watchman in clinical practice. PMID:27307517

  13. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    . The rostering process is non-trivial and especially when service is required around the clock, rostering may involve considerable effort from a designated planner. Therefore, in order to minimize costs and overstaffing, to maximize the utilization of available staff, and to ensure a high level of satisfaction...... as possible to the available staff, while respecting various requirements and rules and while including possible transportation time between tasks. This thesis presents a number of industrial applications in rostering and task scheduling. The applications exist within various contexts in health care....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied...

  14. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  15. Rate-base determination through real-time efficiency assessment

    International Nuclear Information System (INIS)

    Eckhardt, J.H.; Bishop, T.W.

    1990-01-01

    One of the main problems with nuclear power is the extremely high construction costs and long schedules for plant construction and start-up. It is unlikely that utility executives will risk their companies' financial health by committing the necessary capital resources given the prevailing uncertainties. For new nuclear plants to play a major role in preventing future electric supply shortages, the financial uncertainties associated with high construction costs must be minimized. To contain costs and maintain reasonable schedules for future plants, the utilities, vendors, the US Nuclear Regulatory Commission (NRC), and the state regulatory commissions can make specific changes. One of the key factors to reduce uncertainty and improve cost and schedule performance is for the state regulatory commissions to change the method of determining reasonable plant costs and placing those costs in the rate base. Currently, most state regulatory commissions assess the reasonableness of costs only after completion of construction, resulting in years of financial uncertainty and untimely conclusions as to what should have been done better

  16. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  17. Harmonized Tariff Schedule of the United States (2015) - Revision 1

    Data.gov (United States)

    US International Trade Commission — This dataset is the 2015 Harmonized Tariff Schedule Revision 1 effective July 1, 2015. It provides the applicable tariff rates and statistical categories for all...

  18. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  19. Hygienic features of working conditions prevailing in X-ray cabinets

    International Nuclear Information System (INIS)

    Usol'tsev, V.I.; Serebryanyj, V.A.

    1975-01-01

    The results of an investigation of 352 x-ray cabinets showed that their personnel is subjected to simultaneous action of a number of factors: discomfortable microclimate, small concentrations of ozone and nitrogen oxides (within 0.1 of the maximum permissible concentration). The hands of the personnel, especially those of the x-ray laboratory assistants are contaminated with lead (2.38mg in the hands washings). Therefore the assessment of labour conditions prevailing in an x-ray cabinet and the accomplishment of measures of their provement should be carried out with due regards to all the complex of the above mentioned factors besides the ionizing radiation

  20. Clinical efficacy of transcatheter aortic valve replacement for severe aortic stenosis in high-risk patients: the PREVAIL JAPAN trial.

    Science.gov (United States)

    Sawa, Yoshiki; Takayama, Morimasa; Mitsudo, Kazuaki; Nanto, Shinsuke; Takanashi, Shuichiro; Komiya, Tatsuhiko; Kuratani, Toru; Tobaru, Tetsuya; Goto, Tsuyoshi

    2015-01-01

    Transcatheter aortic valve replacement (TAVR) is suggested to be less invasive and/or equally effective in comparison to conventional aortic valve replacement for high-risk symptomatic aortic stenosis patients. We herein report the initial results of a pivotal clinical trial of TAVR in Japan (the PREVAIL JAPAN). Sixty-four aortic stenosis patients (mean age 84.3 ± 6.1 years) not suitable for surgery were enrolled at three centers in Japan, with a primary composite endpoint of the 6-month post-procedure improvements in the aortic valve area and New York Heart Association (NYHA) functional classification. A transfemoral approach was used in 37 patients and a transapical approach was used in 27. The device success rate was 91.9 %. After 30 days and 6 months, the rates of mortality from any cause were 8.1 and 11.3 %, respectively. At 6 months, symptomatic stroke was found in 3.1 % of the patients, and silent infarction in 7.8 %. The aortic valve area and mean pressure gradient were significantly improved over time with both approaches (p < 0.001). At 6 months, the NYHA functional classification based on a conventional physician's assessment was improved in 87.9 % of the patients. We found results that were equivalent to those in other major TAVR trials, such as an acceptable 30-day survival (91.9 %), suggesting that balloon-expandable TAVR is effective for small Japanese AS patients classified as high-risk or inoperable.

  1. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  2. Impact of interference on the performance of selection based parallel multiuser scheduling

    KAUST Repository

    Nam, Sungsik

    2012-02-01

    In conventional multiuser parallel scheduling schemes, every scheduled user is interfering with every other scheduled user, which limits the capacity and performance of multiuser systems, and the level of interference becomes substantial as the number of scheduled users increases. Based on the above observations, we investigate the trade-off between the system throughput and the number of scheduled users through the exact analysis of the total average sum rate capacity and the average spectral efficiency. Our analytical results can help the system designer to carefully select the appropriate number of scheduled users to maximize the overall throughput while maintaining an acceptable quality of service under certain channel conditions. © 2012 IEEE.

  3. Responsive versus scheduled feeding for preterm infants

    OpenAIRE

    Watson, Julie; McGuire, William

    2016-01-01

    Version 5\\ud Background\\ud \\ud Feeding preterm infants in response to their hunger and satiation cues (responsive, cue-based, or infant-led feeding) rather than at scheduled intervals might enhance infants' and parents' experience and satisfaction, help in the establishment of independent oral feeding, increase nutrient intake and growth rates, and allow earlier hospital discharge.\\ud \\ud \\ud Objectives\\ud \\ud To assess the effect of a policy of feeding preterm infants on a responsive basis v...

  4. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  5. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  6. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  7. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  8. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  9. 42 CFR 414.620 - Publication of the ambulance fee schedule.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Publication of the ambulance fee schedule. 414.620... SERVICES (CONTINUED) MEDICARE PROGRAM PAYMENT FOR PART B MEDICAL AND OTHER HEALTH SERVICES Fee Schedule for Ambulance Services § 414.620 Publication of the ambulance fee schedule. Changes in payment rates resulting...

  10. A microeconomic scheduler for parallel computers

    Science.gov (United States)

    Stoica, Ion; Abdel-Wahab, Hussein; Pothen, Alex

    1995-01-01

    We describe a scheduler based on the microeconomic paradigm for scheduling on-line a set of parallel jobs in a multiprocessor system. In addition to the classical objectives of increasing the system throughput and reducing the response time, we consider fairness in allocating system resources among the users, and providing the user with control over the relative performances of his jobs. We associate with every user a savings account in which he receives money at a constant rate. When a user wants to run a job, he creates an expense account for that job to which he transfers money from his savings account. The job uses the funds in its expense account to obtain the system resources it needs for execution. The share of the system resources allocated to the user is directly related to the rate at which the user receives money; the rate at which the user transfers money into a job expense account controls the job's performance. We prove that starvation is not possible in our model. Simulation results show that our scheduler improves both system and user performances in comparison with two different variable partitioning policies. It is also shown to be effective in guaranteeing fairness and providing control over the performance of jobs.

  11. 77 FR 19521 - Prevailing Rate Systems; Redefinition of the Austin, TX and Waco, TX, Appropriated Fund Federal...

    Science.gov (United States)

    2012-04-02

    ... Austin, TX and Waco, TX, Appropriated Fund Federal Wage System Wage Areas AGENCY: U.S. Office of... final rule to redefine the geographic boundaries of the Austin, TX, and Waco, TX, appropriated fund... the Austin wage area to the Waco wage area. These changes are based on recent consensus...

  12. 78 FR 29612 - Prevailing Rate Systems; Redefinition of the Minneapolis-St. Paul, MN, and Southwestern Wisconsin...

    Science.gov (United States)

    2013-05-21

    ... Renville Rice Sherburne Sibley Stearns Steele Stevens Swift Todd Traverse Wabasha Wadena Waseca Watonwan... Langlade Lincoln Marathon Marinette Menominee Oneida Pepin Portage Price Richland Rusk Shawano Taylor...

  13. 77 FR 75589 - Prevailing Rate Systems; Redefinition of the Minneapolis-St. Paul, MN, and Southwestern Wisconsin...

    Science.gov (United States)

    2012-12-21

    ... Nicollet Olmsted Pope Redwood Renville Rice Sherburne Sibley Stearns Steele Stevens Swift Todd Traverse... Shawano Taylor Vernon Vilas Waupaca Wood * * * * * [FR Doc. 2012-30805 Filed 12-20-12; 8:45 am] BILLING...

  14. 78 FR 21515 - Prevailing Rate Systems; Redefinition of the St. Louis, MO; Southern Missouri; Cleveland, OH; and...

    Science.gov (United States)

    2013-04-11

    ... have a significant economic impact on a substantial number of small entities because they will affect... Beaver Butler Washington Westmoreland Area of Application. Survey area plus: Ohio: Belmont Harrison...

  15. 75 FR 71525 - Prevailing Rate Systems; Redefinition of the Chicago, IL; Fort Wayne-Marion, IN; Indianapolis, IN...

    Science.gov (United States)

    2010-11-24

    ... economic impact on a substantial number of small entities because they will affect only Federal agencies... * * * * * PENNSYLVANIA * * * * * PITTSBURGH Survey Area Pennsylvania: Allegheny Beaver Butler Washington Westmoreland...

  16. A decentralized scheduling algorithm for time synchronized channel hopping

    Directory of Open Access Journals (Sweden)

    Andrew Tinka

    2011-09-01

    Full Text Available Time Synchronized Channel Hopping (TSCH is an existing Medium Access Control scheme which enables robust communication through channel hopping and high data rates through synchronization. It is based on a time-slotted architecture, and its correct functioning depends on a schedule which is typically computed by a central node. This paper presents, to our knowledge, the first scheduling algorithm for TSCH networks which both is distributed and which copes with mobile nodes. Two variations on scheduling algorithms are presented. Aloha-based scheduling allocates one channel for broadcasting advertisements for new neighbors. Reservation- based scheduling augments Aloha-based scheduling with a dedicated timeslot for targeted advertisements based on gossip information. A mobile ad hoc motorized sensor network with frequent connectivity changes is studied, and the performance of the two proposed algorithms is assessed. This performance analysis uses both simulation results and the results of a field deployment of floating wireless sensors in an estuarial canal environment. Reservation-based scheduling performs significantly better than Aloha-based scheduling, suggesting that the improved network reactivity is worth the increased algorithmic complexity and resource consumption.

  17. Scheduling mammograms for asymptomatic women

    International Nuclear Information System (INIS)

    Gohagan, J.K.; Darby, W.P.; Spitznagel, E.L.; Tome, A.E.

    1988-01-01

    A decision theoretic model was used to investigate the relative importance of risk level, radiation hazard, mammographic accuracy, and cost in mammographic screening decision. The model uses woman-specific medical and family history facts and clinic-specific information regarding mammographic accuracy and practice to profile both woman and clinic, and to formulate periodic screening recommendations. Model parameters were varied extensively to investigate the sensitivity of screening schedules to input values. Multivariate risk was estimated within the program using published data from the Breast Cancer Detection Demonstration Project 5-year follow-up study. Radiation hazard estimates were developed from published radiation physics and radioepidemiologic risk data. Benchmark values for mammographic sensitivity and specificity under screening conditions were calculated from Breast Cancer Detection Demonstration Project data. Procedural costs used in the analysis were varied around values reflecting conditions at the Washington University Medical Center. Mortality advantages of early versus late breast cancer detection were accounted for using Health Insurance Plan of New York case survival rates. Results are compared with published screening policies to provide insight into implicit assumptions behind those policies. This analysis emphasizes the importance of accounting for variations in clinical accuracy under screening circumstances, in costs, in radiation exposure, and in woman-specific risk when recommending mammographic screening

  18. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  19. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  20. CONSTRUCTION TECHNOLOGY DIFFUSION IN DEVELOPING COUNTRIES: LIMITATIONS OF PREVAILING INNOVATION SYSTEMS

    Directory of Open Access Journals (Sweden)

    Emilia van Egmond-deWilde de Ligny

    2008-12-01

    Full Text Available The diffusion of innovative technologies in the market is usually a complex and difficult process with a varying degree of success and the effects of the diffused innovative technologies are very un-balanced. The objective of our research is to gain insight into the reasons why the diffusion of innovative technology fails, even though they promise a superior performance compared to incumbent technologies. Drawing on innovation systems theories, we have identified and used the concepts of technological regime, actor network and technology sets to analyze technology diffusion in a case study in the dwelling construction industry in Costa Rica. The results showed bottlenecks in the prevailing innovation system that curtailed the diffusion of an innovative construction technology.

  1. El suicidio: Una conducta antisocial que prevalece/Suicide: An antisocial behavior that prevails

    Directory of Open Access Journals (Sweden)

    Omar Alejandro De León Palomo

    2012-01-01

    Full Text Available The suicide has existed throughout history and has prevailed as a behavior that was contrary to the rules of the society in terms of preservation of life itself; the objective of this research was to make emphasis on the nature of antisocial behavior of this behavior and show its prevalence in the years 2006 to 2010 in Mexico and Tamaulipas, as well as from 1999 to 2008 in Reynosa, Tamaulipas. For which the data were obtained from the National Institute of Statistics and Geography to the country and the State and the books of the register of deaths by cause violent of the Regional Unit of Expert Services of the Attorney General of Justice, which has its headquarters in Reynosa; developed a theoretical framework on the impact of the conduct in society and the means to prevent it, The data obtained we revealed the continued presence of this conduct year-on-year, 23.554 cases appearing in Mexico and 819 in Tamaulipas in the period from 2006 to 2010; in Reynosa, Tamaulipas were presented 278 suicides in the period 1999 to 2008. The results show us a conduct stable in numbers, but without excessive overflows that prevails year-on-year, suicide, and the attempt of the same should be viewed as a social problem and not detract from the importance that it deserves a conduct of these dimensions, that is no more than a reflection of the situation in which are the means of social control toward the preservation of life itself.

  2. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  3. Adapting immunisation schedules for children undergoing chemotherapy.

    Science.gov (United States)

    Fernández-Prada, María; Rodríguez-Martínez, María; García-García, Rebeca; García-Corte, María Dolores; Martínez-Ortega, Carmen

    2018-02-01

    Children undergoing chemotherapy for cancer have special vaccination needs after completion of the treatment. The aim of this study was to evaluate the adaptation of post-chemotherapy vaccination schedules. An observational study was performed on a retrospective cohort that included all children aged from 0 to 14 years, who completed chemotherapy in a tertiary hospital between 2009 and 2015. Inclusion and exclusion criteria were applied. Immunisation was administered in accordance with the guidelines of the Vaccine Advisory Committee of the Spanish Association of Paediatrics. Primary Care immunisation and clinical records of the Preventive Medicine and Public Health Department were reviewed. Of the 99 children who had received chemotherapy, 51 (70.6% males) were included in the study. As regards the type of tumour, 54.9% had a solid organ tumour, and 45.1% had a haematological tumour. Post-chemotherapy immunisation was administered to 70.6%. The most common vaccines received were: diphtheria-tetanus-pertussis or diphtheria-tetanus (54.9%), meningococcus C (41.2%), and seasonal influenza (39.2%). The rate of adaptation of the immunisation schedule after chemotherapy was 9.8%. The pneumococcal conjugate vaccine against 7v or 13v was administered to 21.6% of study subjects. However, only 17.6% received polysaccharide 23v. None received vaccination against hepatitis A. No statistically significant differences were observed between adherence to immunisation schedules and type of tumour (P=.066), gender (P=.304), or age (P=.342). Post-chemotherapy immunisation of children with cancer is poor. The participation of health professionals in training programs and referral of paediatric cancer patients to Vaccine Units could improve the rate of schedule adaptation and proper immunisation of this population. Copyright © 2016 Elsevier España, S.L.U. and Sociedad Española de Enfermedades Infecciosas y Microbiología Clínica. All rights reserved.

  4. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  5. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  6. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  7. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  8. Multiple determinants of transfer of evaluative function after conditioning with free-operant schedules of reinforcement.

    Science.gov (United States)

    Dack, Charlotte; Reed, Phil; McHugh, Louise

    2010-11-01

    The aim of the four present experiments was to explore how different schedules of reinforcement influence schedule-induced behavior, their impact on evaluative ratings given to conditioned stimuli associated with each schedule through evaluative conditioning, and the transfer of these evaluations through derived stimulus networks. Experiment 1 compared two contrasting response reinforcement rules (variable ratio [VR], variable interval [VI]). Experiment 2 varied the response to reinforcement rule between two schedules but equated the outcome to response rate (differential reinforcement of high rate [DRH] vs. VR). Experiment 3 compared molar and molecular aspects of contingencies of reinforcement (tandem VIVR vs. tandem VRVI). Finally, Experiment 4 employed schedules that induced low rates of responding to determine whether, under these circumstances, responses were more sensitive to the molecular aspects of a schedule (differential reinforcement of low rate [DRL] vs. VI). The findings suggest that the transfer of evaluative functions is determined mainly by differences in response rate between the schedules and the molar aspects of the schedules. However, when neither schedule was based on a strong response reinforcement rule, the transfer of evaluative judgments came under the control of the molecular aspects of the schedule.

  9. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  10. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  11. Responsive versus scheduled feeding in preterm infants (Review)

    OpenAIRE

    Watson, Julie; McGuire, William

    2015-01-01

    Scheduled feeding of prescribed enteral volumes remains standard practice for preterm infants. However, feeding preterm infants in response to their feeding and satiation cues (responsive, cue-based, or infant led feeding) rather than at scheduled intervals might enhance parent experience and satisfaction, help in the establishment of independent oral feeding, increase nutrient intake and growth rates, and allow earlier hospital discharge.\\ud \\ud Objectives: To assess the effect of feeding pr...

  12. Apprenticeship Learning: Learning to Schedule from Human Experts

    Science.gov (United States)

    2016-06-09

    identified by the heuristic . A spectrum of problems (i.e. traveling salesman, job-shop scheduling, multi-vehicle routing) was represented , as task locations...caus- ing the codification of this knowledge to become labori- ous. We propose a new approach for capturing domain- expert heuristics through a...demonstrate that this approach accu- rately learns multi-faceted heuristics on both a synthetic data set incorporating job-shop scheduling and vehicle

  13. Scheduling strategies for LTE uplink with flow behaviour analysis

    OpenAIRE

    Dimitrova, D.C.; Berg, J.L. van den; Litjens, R.; Heijenk, G.

    2010-01-01

    Long Term Evolution (LTE) is a cellular technology developed to support diversity of data traffic at potentially high rates. It is foreseen to extend the capacity and improve the performance of current 3G cellular networks. A key mechanism in the LTE traffic handling is the packet scheduler, which is in charge of allocating resources to active flows in both the frequency and time dimension. In this paper we present a performance comparison of two distinct scheduling schemes for LTE uplink (fa...

  14. Residency Applicants Prefer Online System for Scheduling Interviews

    Directory of Open Access Journals (Sweden)

    Wills, Charlotte

    2015-03-01

    Full Text Available Introduction: Residency coordinators may be overwhelmed when scheduling residency interviews. Applicants often have to coordinate interviews with multiple programs at once, and relying on verbal or email confirmation may delay the process. Our objective was to determine applicant mean time to schedule and satisfaction using online scheduling. Methods: This pilot study is a retrospective analysis performed on a sample of applicants offered interviews at an urban county emergency medicine residency. Applicants were asked their estimated time to schedule with the online system compared to their average time using other methods. In addition, they were asked on a five-point anchored scale to rate their satisfaction. Results: Of 171 applicants, 121 completed the survey (70.8%. Applicants were scheduling an average of 13.3 interviews. Applicants reported scheduling interviews using the online system in mean of 46.2 minutes (median 10, range 1-1800 from the interview offer as compared with a mean of 320.2 minutes (median 60, range 3-2880 for other programs not using this system. This difference was statistically significant. In addition, applicants were more likely to rate their satisfaction using the online system as “satisfied” (83.5% vs 16.5%. Applicants were also more likely to state that they preferred scheduling their interviews using the online system rather than the way other programs scheduled interviews (74.2% vs 4.1% and that the online system aided them coordinating travel arrangements (52.1% vs 4.1%. Conclusion: An online interview scheduling system is associated with higher satisfaction among applicants both in coordinating travel arrangements and in overall satisfaction. [West J Emerg Med. 2015;16(2:352-354.

  15. Nurse scheduling in a hospital emergency department: A case study at a Thai university hospital

    Directory of Open Access Journals (Sweden)

    Aussadavut Dumrongsiri

    2018-02-01

    Full Text Available Common problems of Thai nurses are low quality of life, working long hours, and a high turnover rate. The workload imbalance among nurses also worsens the turnover rate. With careful schedule planning, nurses do not have to work in consecutive shifts and can rest more. We interviewed and collected data from an emergency department at a hospital administered by a Thai university, related to objectives and constraints of monthly nurse scheduling, and actual monthly schedules. A multi-objective mathematical model was developed using the open source “OpenSolver” software in MS-Excel for nurse schedulers to freely use. We tested the model using actual data collected from the department and found that the schedules created by the model tended to provide more balanced workloads and more days off compared to the schedules created manually by a real scheduler. The model also suggested an easy policy to increase the number of nurses for future expansion.

  16. Evaluation of operational numerical weather predictions in relation to the prevailing synoptic conditions

    Science.gov (United States)

    Pytharoulis, Ioannis; Tegoulias, Ioannis; Karacostas, Theodore; Kotsopoulos, Stylianos; Kartsios, Stergios; Bampzelis, Dimitrios

    2015-04-01

    The Thessaly plain, which is located in central Greece, has a vital role in the financial life of the country, because of its significant agricultural production. The aim of DAPHNE project (http://www.daphne-meteo.gr) is to tackle the problem of drought in this area by means of Weather Modification in convective clouds. This problem is reinforced by the increase of population and the water demand for irrigation, especially during the warm period of the year. The nonhydrostatic Weather Research and Forecasting model (WRF), is utilized for research and operational purposes of DAPHNE project. The WRF output fields are employed by the partners in order to provide high-resolution meteorological guidance and plan the project's operations. The model domains cover: i) Europe, the Mediterranean sea and northern Africa, ii) Greece and iii) the wider region of Thessaly (at selected periods), at horizontal grid-spacings of 15km, 5km and 1km, respectively, using 2-way telescoping nesting. The aim of this research work is to investigate the model performance in relation to the prevailing upper-air synoptic circulation. The statistical evaluation of the high-resolution operational forecasts of near-surface and upper air fields is performed at a selected period of the operational phase of the project using surface observations, gridded fields and weather radar data. The verification is based on gridded, point and object oriented techniques. The 10 upper-air circulation types, which describe the prevailing conditions over Greece, are employed in the synoptic classification. This methodology allows the identification of model errors that occur and/or are maximized at specific synoptic conditions and may otherwise be obscured in aggregate statistics. Preliminary analysis indicates that the largest errors are associated with cyclonic conditions. Acknowledgments This research work of Daphne project (11SYN_8_1088) is co-funded by the European Union (European Regional Development Fund

  17. A Look into Miners' Health in Prevailing Ambience of Underground Coal Mine Environment

    Science.gov (United States)

    Dey, N. C.; Pal, S.

    2012-04-01

    Environmental factors such as noise, vibration, illumination, humidity, temperature and air velocity, etc. do play a major role on the health, comfort and efficient performance of underground coal miners at work. Ergonomics can help to promote health, efficiency and well being of miners and to make best use of their capabilities within the ambit of underground coal mine environment. Adequate work stretch and work-rest scheduling have to be determined for every category of miners from work physiology point of view so as to keep better health of the miners in general and to have their maximum efficiency at work in particular.

  18. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  19. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  20. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  1. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  2. Analysis of the Effect of Prevailing Weather Conditions on the Occurrence of Grain Dust Explosions.

    Science.gov (United States)

    Sanghi, Achint; Ambrose, R P Kingsly

    2016-07-27

    Grain dust explosions have been occurring in the U.S. for the past twenty years. In the past ten years, there have been an average of ten explosions a year, resulting in nine fatalities and 93 injuries. In more than half of these cases, the ignition source remains unidentified. The effect of ambient humidity on the likelihood of a dust explosion has been discussed for many years. However, no investigation into a possible link between the two has been carried out. In this study, we analyzed local weather data and grain dust explosions during the period 2006 to 2014 to measure potential relationships between the two events. The 84 analyzed explosions do not show any trend with regard to prevailing temperatures, or relative or absolute humidity. In addition, the ignition source could not be identified in 54 of the incidents. The majority of grain dust explosion incidents occurred at grain elevator facilities, where the dust generation potential was high compared with grain processing industries. Copyright© by the American Society of Agricultural Engineers.

  3. On the prevailing construction waste recycling practices: a South East Queensland study.

    Science.gov (United States)

    Tam, Vivian W Y; Kotrayothar, Duangthidar; Loo, Yew-Chaye

    2009-03-01

    Waste generated from construction and building demolition work constitutes about 68% of all solid waste generated each year in South East Queensland. Consequently, it has created a serious waste management problem. The State Governments of Victoria and New South Wales have been encouraging the use of recycled materials from construction and related waste; they have also promulgated specifications for their use. In Queensland, however, similar regulations are not anticipated in the near future, which explains the lack of funded research conducted in this important arena. This paper presents an evaluation of the prevailing waste recycling practices in Queensland. Nine sites were visited, including two construction sites, three demolition sites, three recycling plants and one landfill in South East Queensland. The difficulties encountered by the recycling programme operators and their associates at these sites are described and the benefits of recycling construction materials are presented. One of the major barriers is that the local councils disallow the use of recycled materials in new construction work. To help rectify these impediments to recycling, recommendations are given to increase the use of recycled construction waste in South East Queensland.

  4. Appreciation of the nature of light demands enhancement over the prevailing scientific epistemology

    Science.gov (United States)

    Roychoudhuri, Chandrasekhar

    2011-09-01

    Based on attempts to resolve the problem of various self contradictory assumptions behind the prevailing belief on single photon interference, we have analyzed the process steps behind our experimental measurements and named the process as the Interaction Process Mapping Epistemology (IPM-E). This has helped us recognize that the quantum mechanical Measurement Problem has a much universal and deeper root in nature. Our scientific theorization process suffers from a Perpetual Information Challenge (PIC), which cannot be overcome by elegant and/or sophisticated mathematical theories alone. Iterative imaginative application of IPM-E needs to be used as a metaphorical analytical continuation to fill up the missing information gaps. IPM-E has also guided us to recognize the generic NIW-principle (Non-Interaction of Waves) in the linear domain, not explicitly recognized in current books and literature. Superposition effects become manifest through light-matter interactions. Detecting dipoles gets stimulated by multiple superposed beams; it sums the simultaneous multiple stimulations into a single resultant undulation, which then guides the resultant energy exchange. The consequent transformation in the detector corresponds to observed fringes. They neither represent interference of light; nor represent selective arrival or non-arrival of photons on the detector. Photons do not possess any force of mutual interaction to generate their redistribution. Implementation of IPM-E requires us to recognize our subjective interpretation propensity with which we are burdened due to our evolutionary successes.

  5. Why nature prevails over nurture in the making of the elite athlete.

    Science.gov (United States)

    Georgiades, Evelina; Klissouras, Vassilis; Baulch, Jamie; Wang, Guan; Pitsiladis, Yannis

    2017-11-14

    While the influence of nature (genes) and nurture (environment) on elite sporting performance remains difficult to precisely determine, the dismissal of either as a contributing factor to performance is unwarranted. It is accepted that a complex interaction of a combination of innumerable factors may mold a talented athlete into a champion. The prevailing view today is that understanding elite human performance will require the deciphering of two major sources of individual differences, genes and the environment. It is widely accepted that superior performers are endowed with a high genetic potential actualised through hard and prodigious effort. Heritability studies using the twin model have provided the basis to disentangle genetic and environmental factors that contribute to complex human traits and have paved the way to the detection of specific genes for elite sport performance. Yet, the heritability for most phenotypes essential to elite human performance is above 50% but below 100%, meaning that the environment is also important. Furthermore, individual differences can potentially also be explained not only by the impact of DNA sequence variation on biology and behaviour, but also by the effects of epigenetic changes which affect phenotype by modifying gene expression. Despite this complexity, the overwhelming and accumulating evidence, amounted through experimental research spanning almost two centuries, tips the balance in favour of nature in the "nature" and "nurture" debate. In other words, truly elite-level athletes are built - but only from those born with innate ability.

  6. Global empirical wind model for the upper mesosphere/lower thermosphere. I. Prevailing wind

    Directory of Open Access Journals (Sweden)

    Y. I. Portnyagin

    Full Text Available An updated empirical climatic zonally averaged prevailing wind model for the upper mesosphere/lower thermosphere (70-110 km, extending from 80°N to 80°S is presented. The model is constructed from the fitting of monthly mean winds from meteor radar and MF radar measurements at more than 40 stations, well distributed over the globe. The height-latitude contour plots of monthly mean zonal and meridional winds for all months of the year, and of annual mean wind, amplitudes and phases of annual and semiannual harmonics of wind variations are analyzed to reveal the main features of the seasonal variation of the global wind structures in the Northern and Southern Hemispheres. Some results of comparison between the ground-based wind models and the space-based models are presented. It is shown that, with the exception of annual mean systematic bias between the zonal winds provided by the ground-based and space-based models, a good agreement between the models is observed. The possible origin of this bias is discussed.

    Key words: Meteorology and Atmospheric dynamics (general circulation; middle atmosphere dynamics; thermospheric dynamics

  7. Phylogenomics resolves a spider backbone phylogeny and rejects a prevailing paradigm for orb web evolution.

    Science.gov (United States)

    Bond, Jason E; Garrison, Nicole L; Hamilton, Chris A; Godwin, Rebecca L; Hedin, Marshal; Agnarsson, Ingi

    2014-08-04

    Spiders represent an ancient predatory lineage known for their extraordinary biomaterials, including venoms and silks. These adaptations make spiders key arthropod predators in most terrestrial ecosystems. Despite ecological, biomedical, and biomaterial importance, relationships among major spider lineages remain unresolved or poorly supported. Current working hypotheses for a spider "backbone" phylogeny are largely based on morphological evidence, as most molecular markers currently employed are generally inadequate for resolving deeper-level relationships. We present here a phylogenomic analysis of spiders including taxa representing all major spider lineages. Our robust phylogenetic hypothesis recovers some fundamental and uncontroversial spider clades, but rejects the prevailing paradigm of a monophyletic Orbiculariae, the most diverse lineage, containing orb-weaving spiders. Based on our results, the orb web either evolved much earlier than previously hypothesized and is ancestral for a majority of spiders or else it has multiple independent origins, as hypothesized by precladistic authors. Cribellate deinopoid orb weavers that use mechanically adhesive silk are more closely related to a diverse clade of mostly webless spiders than to the araneoid orb-weaving spiders that use adhesive droplet silks. The fundamental shift in our understanding of spider phylogeny proposed here has broad implications for interpreting the evolution of spiders, their remarkable biomaterials, and a key extended phenotype--the spider web. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS

    Directory of Open Access Journals (Sweden)

    A. Alle

    2002-03-01

    Full Text Available The problems of scheduling and optimization of operational conditions in multistage, multiproduct continuous plants with intermediate storage are simultaneously addressed. An MINLP model, called TSPFLOW, which is based on the TSP formulation for product sequencing, is proposed to schedule the operation of such plants. TSPFLOW yields a one-order-of-magnitude CPU time reduction as well as the solution of instances larger than those formerly reported (Pinto and Grossmann, 1994. Secondly, processing rates and yields are introduced as additional optimization variables in order to state the simultaneous problem of scheduling with operational optimization. Results show that trade-offs are very complex and that the development of a straightforward (rule of thumb method to optimally schedule the operation is less effective than the proposed approach.

  9. SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS

    Directory of Open Access Journals (Sweden)

    Alle A.

    2002-01-01

    Full Text Available The problems of scheduling and optimization of operational conditions in multistage, multiproduct continuous plants with intermediate storage are simultaneously addressed. An MINLP model, called TSPFLOW, which is based on the TSP formulation for product sequencing, is proposed to schedule the operation of such plants. TSPFLOW yields a one-order-of-magnitude CPU time reduction as well as the solution of instances larger than those formerly reported (Pinto and Grossmann, 1994. Secondly, processing rates and yields are introduced as additional optimization variables in order to state the simultaneous problem of scheduling with operational optimization. Results show that trade-offs are very complex and that the development of a straightforward (rule of thumb method to optimally schedule the operation is less effective than the proposed approach.

  10. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  11. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  12. Are behaviors at one alternative in concurrent schedules independent of contingencies at the other alternative?

    Science.gov (United States)

    MacDonall, James S

    2017-09-01

    Some have reported changing the schedule at one alternative of a concurrent schedule changed responding at the other alternative (Catania, 1969), which seems odd because no contingencies were changed there. When concurrent schedules are programmed using two schedules, one associated with each alternative that operate continuously, changing the schedule at one alternative also changes the switch schedule at the other alternative. Thus, changes in responding at the constant alternative could be due to the change in the switch schedule. To assess this possibility, six rats were exposed to a series of conditions that alternated between pairs of interval schedules at both alternatives and a pair of interval schedules at one, constant, alternative and a pair of extinction schedules at the other alternative. Comparing run lengths, visit durations and response rates at the constant alternative in the alternating conditions did not show consistent increases and decreases when a strict criterion for changes was used. Using a less stringent definition (any change in mean values) showed changes. The stay/switch analysis suggests it may be inaccurate to apply behavioral contrast to procedures that change from concurrent variable-interval variable-interval schedules to concurrent variable-interval extinction schedules because the contingencies in neither alternative are constant. © 2017 Society for the Experimental Analysis of Behavior.

  13. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different....... Compared to the predictions of an analyst observing untolled equilibrium and taking scheduling preferences as exogenous, we find that both the optimal capacity and the marginal external cost of congestion have changed. The benefits of tolling are greater, and the optimal time varying toll is different....

  14. The influence of "preparedness" on autoshaping, schedule performance, and choice.

    Science.gov (United States)

    Burns, J D; Malone, J C

    1992-11-01

    Two groups of experimentally naive pigeons were exposed to an autoshaping procedure in which the response key was mounted on the wall (the conventional location) or on the floor of the chamber. In two experiments, subjects readily responded to the wall key, but floor-key subjects required shaping. A subsequent experiment compared performance of wall- and floor-key groups on an ascending series of fixed-ratio schedule values, resistance to extinction, differential reinforcement of other behavior, and reversal of key assignment. Each experiment was followed by several sessions of fixed-ratio training; the performance of the wall- and floor-key groups was almost identical throughout. In the final experiment, a fixed-ratio requirement could be completed on either or both keys. Birds initially chose the key on which they had responded during the preceding (reversal of key assignment) experiment. However, within a few sessions both groups showed almost exclusive preference for the floor key. Preference for a key located on the floor may follow from the fact that pigeons are ground feeders and may thus be more "prepared" to peck the floor than to peck a wall. However, autoshaping, under the conditions prevailing here, occurred much more readily to the wall key, suggesting that pecking a vertical surface is more highly prepared. Difficulties in determining relative preparedness seem moot, however, given the lack of between-group differences in the intervening experiments. It is thus unlikely that schedule performances critically depend upon the specific operant response involved.

  15. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  16. The networked minority: How a small group prevailed in a local windfarm conflict

    International Nuclear Information System (INIS)

    Anderson, Carmel

    2013-01-01

    This paper aims to explain through a qualitative case study how a small protest group prevailed during a local windfarm conflict in south-eastern Australia. A social capital analytical framework was developed to analyse the data. The analysis found that two communities inhabited the area for which the windfarm development was proposed. The public participation process failed to address the concerns of both communities and led to the emergence of a social network of resistance. The network had high stocks of bridging social capital, which enabled an effective protest that led to the abandonment of the development. Their effectiveness was inadvertently aided by the windfarm supporters who were unable to act collectively to defend their interests because socio-economic changes in the community among other factors had led to a depletion of their social capital. In this context, different democratic participatory processes were needed to address the concerns of the two communities. Guidance and tools for researching and developing the types of participatory processes needed for vulnerable communities with low social capital and those similar to the social network with high social capital are provided. These will inform community-appropriate public participation processes and participatory planning policy. - Highlights: ► A case study of a local social network's resistance to a windfarm is undertaken. ► The link between high social capital and resistance is confirmed. ► Successful protest groups can be aided by passive windfarm supporters. ► Protesters are likely to participate in well-designed participatory processes. ► Guidance for developing community-specific participatory processes is provided

  17. Additive effects prevail: The response of biota to multiple stressors in an intensively monitored watershed.

    Science.gov (United States)

    Gieswein, Alexander; Hering, Daniel; Feld, Christian K

    2017-09-01

    Freshwater ecosystems are impacted by a range of stressors arising from diverse human-caused land and water uses. Identifying the relative importance of single stressors and understanding how multiple stressors interact and jointly affect biology is crucial for River Basin Management. This study addressed multiple human-induced stressors and their effects on the aquatic flora and fauna based on data from standard WFD monitoring schemes. For altogether 1095 sites within a mountainous catchment, we used 12 stressor variables covering three different stressor groups: riparian land use, physical habitat quality and nutrient enrichment. Twenty-one biological metrics calculated from taxa lists of three organism groups (fish, benthic invertebrates and aquatic macrophytes) served as response variables. Stressor and response variables were subjected to Boosted Regression Tree (BRT) analysis to identify stressor hierarchy and stressor interactions and subsequently to Generalised Linear Regression Modelling (GLM) to quantify the stressors standardised effect size. Our results show that riverine habitat degradation was the dominant stressor group for the river fauna, notably the bed physical habitat structure. Overall, the explained variation in benthic invertebrate metrics was higher than it was in fish and macrophyte metrics. In particular, general integrative (aggregate) metrics such as % Ephemeroptera, Plecoptera and Trichoptera (EPT) taxa performed better than ecological traits (e.g. % feeding types). Overall, additive stressor effects dominated, while significant and meaningful stressor interactions were generally rare and weak. We concluded that given the type of stressor and ecological response variables addressed in this study, river basin managers do not need to bother much about complex stressor interactions, but can focus on the prevailing stressors according to the hierarchy identified. Copyright © 2017 Elsevier B.V. All rights reserved.

  18. A quantitative genetic model of reciprocal altruism: a condition for kin or group selection to prevail.

    Science.gov (United States)

    Aoki, K

    1983-01-01

    A condition is derived for reciprocal altruism to evolve by kin or group selection. It is assumed that many additively acting genes of small effect and the environment determine the probability that an individual is a reciprocal altruist, as opposed to being unconditionally selfish. The particular form of reciprocal altruism considered is TIT FOR TAT, a strategy that involves being altruistic on the first encounter with another individual and doing whatever the other did on the previous encounter in subsequent encounters with the same individual. Encounters are restricted to individuals of the same generation belonging to the same kin or breeding group, but first encounters occur at random within that group. The number of individuals with which an individual interacts is assumed to be the same within any kin or breeding group. There are 1 + i expected encounters between two interacting individuals. On any encounter, it is assumed that an individual who behaves altruistically suffers a cost in personal fitness proportional to c while improving his partner's fitness by the same proportion of b. Then, the condition for kin or group selection to prevail is [Formula: see text] if group size is sufficiently large and the group mean and the within-group genotypic variance of the trait value (i.e., the probability of being a TIT-FOR-TAT strategist) are uncorrelated. Here, C, Vb, and Tb are the population mean, between-group variance, and between-group third central moment of the trait value and r is the correlation between the additive genotypic values of interacting kin or of individuals within the same breeding group. The right-hand side of the above inequality is monotone decreasing in C if we hold Tb/Vb constant, and kin and group selection become superfluous beyond a certain threshold value of C. The effect of finite group size is also considered in a kin-selection model. PMID:6575395

  19. Prevailing theories of consciousness are challenged by novel cross-modal associations acquired between subliminal stimuli.

    Science.gov (United States)

    Scott, Ryan B; Samaha, Jason; Chrisley, Ron; Dienes, Zoltan

    2018-06-01

    While theories of consciousness differ substantially, the 'conscious access hypothesis', which aligns consciousness with the global accessibility of information across cortical regions, is present in many of the prevailing frameworks. This account holds that consciousness is necessary to integrate information arising from independent functions such as the specialist processing required by different senses. We directly tested this account by evaluating the potential for associative learning between novel pairs of subliminal stimuli presented in different sensory modalities. First, pairs of subliminal stimuli were presented and then their association assessed by examining the ability of the first stimulus to prime classification of the second. In Experiments 1-4 the stimuli were word-pairs consisting of a male name preceding either a creative or uncreative profession. Participants were subliminally exposed to two name-profession pairs where one name was paired with a creative profession and the other an uncreative profession. A supraliminal task followed requiring the timed classification of one of those two professions. The target profession was preceded by either the name with which it had been subliminally paired (concordant) or the alternate name (discordant). Experiment 1 presented stimuli auditorily, Experiment 2 visually, and Experiment 3 presented names auditorily and professions visually. All three experiments revealed the same inverse priming effect with concordant test pairs associated with significantly slower classification judgements. Experiment 4 sought to establish if learning would be more efficient with supraliminal stimuli and found evidence that a different strategy is adopted when stimuli are consciously perceived. Finally, Experiment 5 replicated the unconscious cross-modal association achieved in Experiment 3 utilising non-linguistic stimuli. The results demonstrate the acquisition of novel cross-modal associations between stimuli which are not

  20. Projected changes in prevailing winds for transatlantic migratory birds under global warming.

    Science.gov (United States)

    La Sorte, Frank A; Fink, Daniel

    2017-03-01

    A number of terrestrial bird species that breed in North America cross the Atlantic Ocean during autumn migration when travelling to their non-breeding grounds in the Caribbean or South America. When conducting oceanic crossings, migratory birds tend to associate with mild or supportive winds, whose speed and direction may change under global warming. The implications of these changes for transoceanic migratory bird populations have not been addressed. We used occurrence information from eBird (1950-2015) to estimate the geographical location of population centres at a daily temporal resolution across the annual cycle for 10 transatlantic migratory bird species. We used this information to estimate the location and timing of autumn migration within the transatlantic flyway. We estimated how prevailing winds are projected to change within the transatlantic flyway during this time using daily wind speed anomalies (1996-2005 and 2091-2100) from 29 Atmosphere-Ocean General Circulation Models implemented under CMIP5. Autumn transatlantic migrants have the potential to encounter strong westerly crosswinds early in their transatlantic journey at intermediate and especially high migration altitudes, strong headwinds at low and intermediate migration altitudes within the Caribbean that increase in strength as the season progresses, and weak tailwinds at intermediate and high migration altitudes east of the Caribbean. The CMIP5 simulations suggest that, during this century, the likelihood of autumn transatlantic migrants encountering strong westerly crosswinds will diminish. As global warming progresses, the need for species to compensate or drift under the influence of strong westerly crosswinds during the initial phase of their autumn transatlantic journey may be diminished. Existing strategies that promote headwind avoidance and tailwind assistance will likely remain valid. Thus, climate change may reduce time and energy requirements and the chance of mortality or

  1. Prevailing negative soil biota effect and no evidence for local adaptation in a widespread Eurasian grass.

    Directory of Open Access Journals (Sweden)

    Viktoria Wagner

    2011-03-01

    Full Text Available Soil biota effects are increasingly accepted as an important driver of the abundance and distribution of plants. While biogeographical studies on alien invasive plant species have indicated coevolution with soil biota in their native distribution range, it is unknown whether adaptation to soil biota varies among populations within the native distribution range. The question of local adaptation between plants and their soil biota has important implications for conservation of biodiversity and may justify the use of seed material from local provenances in restoration campaigns.We studied soil biota effects in ten populations of the steppe grass Stipa capillata from two distinct regions, Europe and Asia. We tested for local adaptation at two different scales, both within (ca. 10-80 km and between (ca. 3300 km regions, using a reciprocal inoculation experiment in the greenhouse for nine months. Generally, negative soil biota effects were consistent. However, we did not find evidence for local adaptation: both within and between regions, growth of plants in their 'home soil' was not significantly larger relative to that in soil from other, more distant, populations.Our study suggests that negative soil biota effects can prevail in different parts of a plant species' range. Absence of local adaptation points to the possibility of similar rhizosphere biota composition across populations and regions, sufficient gene flow to prevent coevolution, selection in favor of plasticity, or functional redundancy among different soil biota. From the point of view of plant--soil biota interactions, our findings indicate that the current practice of using seeds exclusively from local provenances in ecosystem restoration campaigns may not be justified.

  2. Prevailing trends of climatic extremes across Indus-Delta of Sindh-Pakistan

    Science.gov (United States)

    Abbas, Farhat; Rehman, Iqra; Adrees, Muhammad; Ibrahim, Muhammad; Saleem, Farhan; Ali, Shafaqat; Rizwan, Muhammad; Salik, Muhammad Raza

    2018-02-01

    This study examines the variability and change in the patterns of climatic extremes experienced in Indus-Delta of Sindh province of Pakistan, comprising regions of Karachi, Badin, Mohenjodaro, and Rohri. The homogenized daily minimum and maximum temperature and precipitation data for a 36-year period were used to calculate 13 and 11 indices of temperature and precipitation extremes with the help of RClimDex, a program written in the statistical software package R. A non-parametric Mann-Kendall test and Sen's slope estimates were used to determine the statistical significance and magnitude of the calculated trend. Temperatures of summer days and tropical nights increased in the region with overall significant warming trends for monthly maximum temperature as well as for warm days and nights reflecting dry conditions in the study area. The warm extremes and nighttime temperature indices showed greater trends than cold extremes and daytime indices depicting an overall warming trends in the Delta. Historic decrease in the acreage of major crops and over 33% decrease in agriculture credit for Sindh are the indicators of adverse impacts of warmer and drier weather on Sindh agriculture. Trends reported for Karachi and Badin are expected to decrease rice cultivation, hatching of fisheries, and mangroves forest surrounding these cities. Increase in the prevailing temperature trends will lead to increasingly hotter and drier summers resulting to constraints on cotton, wheat, and rice yield in Rohri and Mohenjodaro areas due to increased crop water requirements that may be met with additional groundwater pumping; nonetheless, the depleted groundwater resources would have a direct impact on the region's economy.

  3. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  4. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  5. How useful are preemptive schedules?

    NARCIS (Netherlands)

    Brucker, P.; Heitmann, S.; Hurink, J.L.

    2001-01-01

    Machine scheduling admits two options to process jobs. In a preemptive mode processing may be interrupted and resumed later even on a different machine. In a nonpreemptive mode interruptions are not allowed. Usually, the possibility to preempt jobs leads to better performance values. However, also

  6. Interaction in activity location scheduling

    NARCIS (Netherlands)

    Tabak, V.; Vries, de B.; Dijkstra, J.; Jessurun, A.J.

    2006-01-01

    In this paper we discuss the interaction in activity location scheduling which is the main subject of an ongoing research project called "User Simulation of Space Utilization". The aim of this research project is to develop an overall model for the simulation of human movement and utilization of

  7. Scheduling with target start times

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.; Klein Haneveld, W.K.; Vrieze, O.J.; Kallenberg, L.C.M.

    1997-01-01

    We address the single-machine problem of scheduling n independent jobs subject to target start times. Target start times are essentially release times that may be violated at a certain cost. The goal is to minimize an objective function that is composed of total completion time and maximum

  8. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  9. Flexible Schedules and Shift Work.

    Science.gov (United States)

    Beers, Thomas M.

    2000-01-01

    Flexible work hours have gained prominence, as more than 25 million workers (27.6% of all full-time workers) can now vary their schedules. However, there has been little change since the mid-1980s in the proportion who work a shift other than a regular daytime shift. (JOW)

  10. Scheduling periodic tasks with slack

    NARCIS (Netherlands)

    Korst, J.H.M.; Aarts, E.H.L.; Lenstra, J.K.

    1997-01-01

    We consider the problem of nonpreemptively scheduling periodic tasks on a minimum number of identical processors, assuming that some slack is allowed in the time between successive executions of a periodic task. We prove that the problem is NP-hard in the strong sense. Necessary and sufficient

  11. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    replace earlier versions of the F/A-18. Joint and International Nature At the time of JSF conception, there was a clear preference at the highest levels...ALPHABET SOUP ” (Aboulafia, 2015) OF STUDIES AND CONCEPTS • … MERGED INTO JAST • … WHICH EVOLVED TO JSF • WELL-KNOWN COST AND SCHEDULE

  12. Analyzing NPS Scheduling Using OSIRIS

    Science.gov (United States)

    1993-03-01

    School TEACHER SCHEDULE BLOCKS REPORT Date: 2/19/93 Period Name ID Term Days 1234 Adragna , Joe 170401 1 F xx Agrawal, Brij 120101 1 F xx Almquist...LOAD REPORT Date: 3/18/93 Total Max Consec Total Teacher ID Term Classes Classes Stud Adragna , Joe 170401 1 1 1 3 Agrawal, Brij 120101 1 2 2 98 Aiello

  13. Comparing Book- and Tablet-Based Picture Activity Schedules: Acquisition and Preference.

    Science.gov (United States)

    Giles, Aimee; Markham, Victoria

    2017-09-01

    Picture activity schedules consist of a sequence of images representing the order of tasks for a person to complete. Although, picture activity schedules have traditionally been presented in a book format, recently picture activity schedules have been evaluated on technological devices such as an iPod™ touch. The present study compared the efficiency of picture activity schedule acquisition on book- and tablet-based modalities. In addition, participant preference for each modality was assessed. Three boys aged below 5 years with a diagnosis of autism participated. Participants were taught to follow the schedules using both modalities. Following mastery of each modality of picture activity schedule, a concurrent-chains preference assessment was conducted to evaluate participant preference for each modality. Differences in acquisition rates across the two modalities were marginal. Preference for book- or tablet-based schedules was idiosyncratic across participants.

  14. On Multiple Users Scheduling Using Superposition Coding over Rayleigh Fading Channels

    KAUST Repository

    Zafar, Ammar

    2013-02-20

    In this letter, numerical results are provided to analyze the gains of multiple users scheduling via superposition coding with successive interference cancellation in comparison with the conventional single user scheduling in Rayleigh blockfading broadcast channels. The information-theoretic optimal power, rate and decoding order allocation for the superposition coding scheme are considered and the corresponding histogram for the optimal number of scheduled users is evaluated. Results show that at optimality there is a high probability that only two or three users are scheduled per channel transmission block. Numerical results for the gains of multiple users scheduling in terms of the long term throughput under hard and proportional fairness as well as for fixed merit weights for the users are also provided. These results show that the performance gain of multiple users scheduling over single user scheduling increases when the total number of users in the network increases, and it can exceed 10% for high number of users

  15. A Review Of Fault Tolerant Scheduling In Multicore Systems

    Directory of Open Access Journals (Sweden)

    Shefali Malhotra

    2015-05-01

    Full Text Available Abstract In this paper we have discussed about various fault tolerant task scheduling algorithm for multi core system based on hardware and software. Hardware based algorithm which is blend of Triple Modulo Redundancy and Double Modulo Redundancy in which Agricultural Vulnerability Factor is considered while deciding the scheduling other than EDF and LLF scheduling algorithms. In most of the real time system the dominant part is shared memory.Low overhead software based fault tolerance approach can be implemented at user-space level so that it does not require any changes at application level. Here redundant multi-threaded processes are used. Using those processes we can detect soft errors and recover from them. This method gives low overhead fast error detection and recovery mechanism. The overhead incurred by this method ranges from 0 to 18 for selected benchmarks. Hybrid Scheduling Method is another scheduling approach for real time systems. Dynamic fault tolerant scheduling gives high feasibility rate whereas task criticality is used to select the type of fault recovery method in order to tolerate the maximum number of faults.

  16. Prevailing climatic trends and runoff response from Hindukush-Karakoram-Himalaya, upper Indus Basin

    Science.gov (United States)

    Hasson, Shabeh ul; Böhner, Jürgen; Lucarini, Valerio

    2017-05-01

    Largely depending on the meltwater from the Hindukush-Karakoram-Himalaya, withdrawals from the upper Indus Basin (UIB) contribute half of the surface water availability in Pakistan, indispensable for agricultural production systems, industrial and domestic use, and hydropower generation. Despite such importance, a comprehensive assessment of prevailing state of relevant climatic variables determining the water availability is largely missing. Against this background, this study assesses the trends in maximum, minimum and mean temperatures, diurnal temperature range and precipitation from 18 stations (1250-4500 m a.s.l.) for their overlapping period of record (1995-2012) and, separately, from six stations of their long-term record (1961-2012). For this, a Mann-Kendall test on serially independent time series is applied to detect the existence of a trend, while its true slope is estimated using the Sen's slope method. Further, locally identified climatic trends are statistically assessed for their spatial-scale significance within 10 identified subregions of the UIB, and the spatially (field-) significant climatic trends are then qualitatively compared with the trends in discharge out of corresponding subregions. Over the recent period (1995-2012), we find warming and drying of spring (field-significant in March) and increasing early melt season discharge from most of the subregions, likely due to a rapid snowmelt. In stark contrast, most of the subregions feature a field-significant cooling within the monsoon period (particularly in July and September), which coincides well with the main glacier melt season. Hence, a decreasing or weakly increasing discharge is observed from the corresponding subregions during mid- to late melt season (particularly in July). Such tendencies, being largely consistent with the long-term trends (1961-2012), most likely indicate dominance of the nival but suppression of the glacial melt regime, altering overall hydrology of the UIB in

  17. Prevailing climatic trends and runoff response from Hindukush–Karakoram–Himalaya, upper Indus Basin

    Directory of Open Access Journals (Sweden)

    S. U. Hasson

    2017-05-01

    Full Text Available Largely depending on the meltwater from the Hindukush–Karakoram–Himalaya, withdrawals from the upper Indus Basin (UIB contribute half of the surface water availability in Pakistan, indispensable for agricultural production systems, industrial and domestic use, and hydropower generation. Despite such importance, a comprehensive assessment of prevailing state of relevant climatic variables determining the water availability is largely missing. Against this background, this study assesses the trends in maximum, minimum and mean temperatures, diurnal temperature range and precipitation from 18 stations (1250–4500 m a.s.l. for their overlapping period of record (1995–2012 and, separately, from six stations of their long-term record (1961–2012. For this, a Mann–Kendall test on serially independent time series is applied to detect the existence of a trend, while its true slope is estimated using the Sen's slope method. Further, locally identified climatic trends are statistically assessed for their spatial-scale significance within 10 identified subregions of the UIB, and the spatially (field- significant climatic trends are then qualitatively compared with the trends in discharge out of corresponding subregions. Over the recent period (1995–2012, we find warming and drying of spring (field-significant in March and increasing early melt season discharge from most of the subregions, likely due to a rapid snowmelt. In stark contrast, most of the subregions feature a field-significant cooling within the monsoon period (particularly in July and September, which coincides well with the main glacier melt season. Hence, a decreasing or weakly increasing discharge is observed from the corresponding subregions during mid- to late melt season (particularly in July. Such tendencies, being largely consistent with the long-term trends (1961–2012, most likely indicate dominance of the nival but suppression of the glacial melt regime

  18. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  19. 78 FR 62627 - Sam Rayburn Dam Rate

    Science.gov (United States)

    2013-10-22

    ..., Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative, Inc. (Contract No... Schedule SRD-08, Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative... ADMINISTRATION RATE SCHEDULE SRD-13 \\1\\ WHOLESALE RATES FOR HYDRO POWER AND ENERGY SOLD TO SAM RAYBURN DAM...

  20. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  1. Cyclic delivery scheduling to customers with different priorities

    Directory of Open Access Journals (Sweden)

    Katarzyna Zofia Gdowska

    2013-12-01

    Full Text Available Background: In this paper a cyclic delivery scheduling problem for customers with different priorities is presented. Shops, which are provided with deliveries, are occasionally located in places which are crucial for the proper flow of traffic. In such places coordination of deliveries is crucial; therefore it allows to completely eliminate the phenomenon of the simultaneous arrivals of suppliers. Methods: In this paper the cyclic delivery scheduling problem for customers with different priorities was presented. To this theoretical problem a mix integer programming model was developed. Specific approach to the cyclic delivery scheduling problem is inspired by timetabling problem for urban public transport. Results: Mixed integer programming model was employed for solving four cases of cyclic delivery scheduling problem for customers with different priorities. When the value of the synchronization priority assigned to a single customer raised then the total number of synchronizations in the whole network decreased. In order to compare solutions a synchronization rate was utilized. A simple factor was utilized - the proportion of number of synchronizations of deliveries to a given customer to the total number of synchronizations obtained for the whole network. When the value of synchronization priority raised then the value of synchronization rate of this customer improved significantly. Conclusions: The mixed integer programming model for the cyclic delivery scheduling problem for customers with different priorities presented in this paper can be utilized for generating schedules of serving customers located in places where only one delivery can be received and unloaded at one go and where there is no space for other suppliers to wait in a queue. Such a schedule can be very useful for organizing deliveries to small shops united in a franchising network, since they operate in a way that is very similar to the network presented in this paper

  2. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker cons...... consumption and the impact on the remaining network and the customer service level. The model is applied to 4 real cases from Maersk Line. Solutions are comparable or superior to those chosen by operations managers. Cost savings of up to 58% may be achieved.......Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  3. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  4. Time-critical multirate scheduling using contemporary real-time operating system services

    Science.gov (United States)

    Eckhardt, D. E., Jr.

    1983-01-01

    Although real-time operating systems provide many of the task control services necessary to process time-critical applications (i.e., applications with fixed, invariant deadlines), it may still be necessary to provide a scheduling algorithm at a level above the operating system in order to coordinate a set of synchronized, time-critical tasks executing at different cyclic rates. The scheduling requirements for such applications and develops scheduling algorithms using services provided by contemporary real-time operating systems.

  5. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  6. Preemptive scheduling in overloaded systems

    Czech Academy of Sciences Publication Activity Database

    Chrobak, M.; Epstein, L.; Noga, J.; Sgall, Jiří; van Stee, R.; Tichý, Tomáš; Vakhania, N.

    2003-01-01

    Roč. 67, č. 1 (2003), s. 183-197 ISSN 0022-0000 R&D Projects: GA ČR GA201/01/1195; GA MŠk ME 476; GA AV ČR IAA1019901; GA MŠk LN00A056 Institutional research plan: CEZ:AV0Z1019905; CEZ:AV0Z1019905 Keywords : scheduling * online algorithms * benefit Subject RIV: BA - General Mathematics Impact factor: 0.795, year: 2003

  7. WCET Analysis for Preemptive Scheduling

    OpenAIRE

    Altmeyer, Sebastian; Gebhard, Gernot

    2008-01-01

    Hard real-time systems induce strict constraints on the timing of the task set. Validation of these timing constraints is thus a major challenge during the design of such a system. Whereas the derivation of timing guarantees must already be considered complex if tasks are running to completion, it gets even more complex if tasks are scheduled preemptively -- especially due to caches, deployed to improve the average performance. In this paper we propose a new method to compu...

  8. Scheduling Maintenance Jobs in Networks

    OpenAIRE

    Abed, Fidaa; Chen, Lin; Disser, Yann; Groß, Martin; Megow, Nicole; Meißner, Julie; Richter, Alexander T.; Rischke, Roman

    2017-01-01

    We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time; for the special case of path networks, this is related to the problem of minimizing the busy time of machines. We show that the problem can be solved in polynomial time in arbitrary networks if preemption is allowed. If preemption is restricted to integral t...

  9. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  10. Broadcast scheduling for mobile advertising

    OpenAIRE

    De Reyck, B.; Degraeve, Z.

    2003-01-01

    We describe a broadcast scheduling system developed for a precision marketing firm specialized in location-sensitive permission-based mobile advertising using SMS (Short Message Service) text messaging. Text messages containing advertisements were sent to registered customers when they were shopping in one of two shopping centers in the vicinity of London. The ads typically contained a limited-time promotional offer. The company's problem was deciding which ads to send out to which customers ...

  11. Schedule of the nuclear program

    International Nuclear Information System (INIS)

    Heigl, F.

    1977-01-01

    The lecure tries to explain the main phases which must be passed to establish nuclear power plants, the feasibility phase, preconstruction and construction phase. Each phase consists of a lot of activities which are commented. Further the lecture tries to give some ideas of durances and dependence between the phases or activities to get a complete time schedule of the realization of a nuclear power project. (HP) [de

  12. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  13. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  14. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  15. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  16. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  17. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  18. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  19. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  20. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  1. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  2. Scheduling Algorithms for Maximizing Throughput with Zero-Forcing Beamforming in a MIMO Wireless System

    Science.gov (United States)

    Foronda, Augusto; Ohta, Chikara; Tamaki, Hisashi

    Dirty paper coding (DPC) is a strategy to achieve the region capacity of multiple input multiple output (MIMO) downlink channels and a DPC scheduler is throughput optimal if users are selected according to their queue states and current rates. However, DPC is difficult to implement in practical systems. One solution, zero-forcing beamforming (ZFBF) strategy has been proposed to achieve the same asymptotic sum rate capacity as that of DPC with an exhaustive search over the entire user set. Some suboptimal user group selection schedulers with reduced complexity based on ZFBF strategy (ZFBF-SUS) and proportional fair (PF) scheduling algorithm (PF-ZFBF) have also been proposed to enhance the throughput and fairness among the users, respectively. However, they are not throughput optimal, fairness and throughput decrease if each user queue length is different due to different users channel quality. Therefore, we propose two different scheduling algorithms: a throughput optimal scheduling algorithm (ZFBF-TO) and a reduced complexity scheduling algorithm (ZFBF-RC). Both are based on ZFBF strategy and, at every time slot, the scheduling algorithms have to select some users based on user channel quality, user queue length and orthogonality among users. Moreover, the proposed algorithms have to produce the rate allocation and power allocation for the selected users based on a modified water filling method. We analyze the schedulers complexity and numerical results show that ZFBF-RC provides throughput and fairness improvements compared to the ZFBF-SUS and PF-ZFBF scheduling algorithms.

  3. Do the Math: Course Redesign's Impact on Learning and Scheduling

    Science.gov (United States)

    Squires, John; Faulkner, Jerry; Hite, Carl

    2009-01-01

    The math department at Cleveland State Community College embarked upon course redesign in 2008. As a result of this project, student engagement, learning, and success rates have increased dramatically. By including both developmental and college level math courses in the redesign, the department has been able to implement innovative scheduling and…

  4. 75 FR 28071 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2010-05-19

    ... authorized for disposal or reduce the retention period of records already authorized for disposal. NARA... this accumulation, agency records managers prepare schedules proposing retention periods for records... information concerning evaluations of enlisted personnel. Included are job ratings as well as information...

  5. Scheduling strategies for LTE uplink with flow behaviour analysis

    NARCIS (Netherlands)

    Dimitrova, D.C.; Berg, J.L. van den; Litjens, R.; Heijenk, G.

    2010-01-01

    Long Term Evolution (LTE) is a cellular technology developed to support diversity of data traffic at potentially high rates. It is foreseen to extend the capacity and improve the performance of current 3G cellular networks. A key mechanism in the LTE traffic handling is the packet scheduler, which

  6. Scheduling strategies for LTE uplink with flow behaviour analysis

    NARCIS (Netherlands)

    Dimitrova, D.C.; van den Berg, Hans Leo; Litjens, R.; Brogle, Marc; Osipov, Evgeny; Heijenk, Gerhard J.

    Long Term Evolution (LTE) is a cellular technology developed to support diversity of data traffic at potentially high rates. It is foreseen to extend the capacity and improve the performance of current 3G cellular networks. A key mechanism in the LTE traffic handling is the packet scheduler, which

  7. Human Schedule Performance, Protocol Analysis, and the "Silent Dog" Methodology

    Science.gov (United States)

    Cabello, Francisco; Luciano, Carmen; Gomez, Inmaculada; Barnes-Holmes, Dermot

    2004-01-01

    The purpose of the current experiment was to investigate the role of private verbal behavior on the operant performances of human adults, using a protocol analysis procedure with additional methodological controls (the "silent dog" method). Twelve subjects were exposed to fixed ratio 8 and differential reinforcement of low rate 3-s schedules. For…

  8. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Science.gov (United States)

    2010-10-01

    ... productivity, etc.) prevailing on or near the effective date of the proposed increase. Revenues in column (d... productivity, etc.) prevailing on or near the effective date of the proposed increase plus allowable.... 11÷ Pt. I, L. 22 Part III—Allocation of Increased System Operating Expenses and Sum of Money to...

  9. Joint Scheduling for Dual-Hop Block-Fading Broadcast Channels

    KAUST Repository

    Zafar, Ammar

    2012-09-16

    In this paper, we propose joint user-and-hop scheduling over dual-hop block-fading broadcast channels in order to exploit multi-user diversity gains and multi-hop diversity gains all together. To achieve this objective, the first and second hops are scheduled opportunistically based on the channel state information and as a prerequisite we assume that the relay, which is half-duplex and operates using decode-and-forward, is capable of storing the received packets from the source until the channel condition of the destined user becomes good to be scheduled. We formulate the joint scheduling problem as maximizing the weighted sum of the long term achievable rates by the users under a stability constraint, which means that on the long term the rate received by the relay should equal the rate transmitted by it, in addition to constant or variable power constraints. We show that this problem is equivalent to a single-hop broadcast channel by treating the source as a virtual user with an optimal priority weight that maintains the stability constraint. We show how to obtain the source weight either off-line based on channel statistics or on real-time based on channel measurements. Furthermore, we consider special cases including the maximum sum rate scheduler and the proportional fair scheduler. We demonstrate via numerical results that our proposed joint scheduling scheme enlarges the rate region as compared with a scheme that employs multi-user scheduling alone.

  10. Further analysis of PREVAIL: enzalutamide use in chemotherapy-naïve men with metastatic castration-resistant prostate cancer.

    Science.gov (United States)

    Aragon-Ching, Jeanny B

    2014-01-01

    PREVAIL was a phase III multinational, double-blind, placebo-controlled trial that enrolled chemotherapy-naïve men with metastatic castration-resistant prostate cancer (mCRPC), which showed remarkable improvement in co-primary endpoints with an overall 81% reduction in the risk of radiographic progression, as well as 29% reduction in the risk of death in favor of the enzalutamide arm over placebo. All secondary endpoints including time to subsequent chemotherapy initiation and prostate specific antigen (PSA) progression were in favor of the enzalutamide arm. The results of PREVAIL shows the utility of enzalutamide that would likely soon expand the indication to asymptomatic or minimally symptomatic men with mCRPC not previously treated with chemotherapy.

  11. False-positive findings in mammography screening induces short-term distress - breast cancer-specific concern prevails longer

    DEFF Research Database (Denmark)

    Aro, A R; Pilvikki Absetz, S; van Elderen, T M

    2000-01-01

    -ups at 2 and 12 months postscreening. At 2 months, there was a moderate multivariate effect of group on distress; and intrusive thinking and worry about breast cancer, in particular, were most frequent amongst the false positives. Intrusive thinking still prevailed at 12 months, in addition to a higher...... findings (n=1407), false-positive findings (n=492) and referents from outside the screening programme (n=1718, age 48-49 years). Distress was measured as illness worry, anxiety, depression, cancer beliefs and early detection behaviour. Measurements were one month before screening invitation with follow...... perceived breast cancer risk and susceptibility. Distress related to screening and false-positive findings seems to be moderate, but prevailing cancer-specific concerns call for improvements in screening programmes....

  12. Prevailing practices in the use of antibiotics by dairy farmers in Eastern Haryana region of India

    Science.gov (United States)

    Kumar, Vikash; Gupta, Jancy

    2018-01-01

    Aim: The aim of the study was to assess the antibiotic use in dairy animals and to trace its usage pattern among the small, medium, and large dairy farmers in Eastern Haryana region of India. Materials and Methods: Karnal and Kurukshetra districts from Eastern region of Haryana state were purposively selected, and four villages from each district were selected randomly. From each village, 21 farmers were selected using stratified random sampling by categorizing into small, medium, and large farmers constituting a total of 168 farmers as respondents. An antibiotic usage index (AUI) was developed to assess usage of antibiotics by dairy farmers. Results: Frequency of veterinary consultancy was high among large dairy farmers, and they mostly preferred veterinarians over para-veterinarians for treatment of dairy animals. Small farmers demanded low-cost antibiotics from veterinarians whereas large farmers rarely went for it. Antibiotics were used maximum for therapeutic purposes by all categories of farmers. Completion of treatment schedules and follow-up were strictly practiced by the majority of large farmers. AUI revealed that large farmers were more consistent on decision-making about prudent use of antibiotics. Routine use of antibiotics after parturition to prevent disease and sale of milk without adhering to withdrawal period was responsible for aggravating the antibiotic resistance. The extent of antibiotic use by small farmers depended on the severity of disease. The large farmers opted for the prophylactic use of antibiotics at the herd level. Conclusion: Antibiotic usage practices were judicious among large dairy farmers, moderately prudent by medium dairy farmers and faulty by small farmers. The frequency of veterinary consultancy promoted better veterinary-client relationship among large farmers. PMID:29657416

  13. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  14. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  15. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  16. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  17. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  18. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  19. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  20. False-positive findings in mammography screening induces short-term distress - breast cancer-specific concern prevails longer

    DEFF Research Database (Denmark)

    Aro, A R; Pilvikki Absetz, S; van Elderen, T M

    2000-01-01

    The aim of this study was to examine psychological distress in a mammography screening process as a consequence of screening after adjusting for background, personality and prescreening distress. Subjects, aged 50 years, were invitees at their first screening. There were three groups; normal find...... perceived breast cancer risk and susceptibility. Distress related to screening and false-positive findings seems to be moderate, but prevailing cancer-specific concerns call for improvements in screening programmes....

  1. Hepatitis B vaccination in prison with a 3-week schedule is more efficient than the standard 6-month schedule

    DEFF Research Database (Denmark)

    Christensen, Peer B; Fisker, Niels; Krarup, Henrik B

    2004-01-01

    A randomized study of injecting drug users in a Danish prison comparing vaccination at 0, 1 and 3 weeks with the 0, 1 and 6 months schedule (20microg Engerix B i.m.) was conducted. Due to a low participation rate, a second nonrandomized study was conducted in Estonia where all prisoners were vacc...

  2. Comparison of the feasibility and effectiveness of transradial coronary angiography via right versus left radial artery approaches (from the PREVAIL Study).

    Science.gov (United States)

    Pelliccia, Francesco; Trani, Carlo; Biondi-Zoccai, Giuseppe G L; Nazzaro, Marco; Berni, Andrea; Patti, Giuseppe; Patrizi, Roberto; Pironi, Bruno; Mazzarotto, Pietro; Gioffrè, Gaetano; Speciale, Giulio; Pristipino, Christian

    2012-09-15

    It remains undefined if transradial coronary angiography from a right or left radial arterial approach differs in real-world practice. To address this issue, we performed a subanalysis of the PREVAIL study. The PREVAIL study was a prospective, multicenter, observational survey of unselected consecutive patients undergoing invasive cardiovascular procedures over a 1-month observation period, specifically aimed at assessing the outcomes of radial approach in the contemporary real world. The choice of arterial approach was left to the discretion of the operator. Prespecified end points of this subanalysis were procedural characteristics. Of 1,052 patients consecutively enrolled, 509 patients underwent transradial catheterization, 304 with a right radial and 205 with a left radial approach. Procedural success rates were similar between the 2 groups. Compared to the left radial group, the right radial group had longer procedure duration (46 ± 29 vs 33 ± 24 minutes, p <0.0001) and fluoroscopy time (765 ± 787 vs 533 ± 502, p <0.0001). At multivariate analysis, including a parsimonious propensity score for the choice of left radial approach, duration of procedure (beta coefficient 11.38, p <0.001) and total dose-area product (beta coefficient 11.38, p <0.001) were independently associated with the choice of the left radial artery approach. The operator's proficiency in right/left radial approach did not influence study results. In conclusion, right and left radial approaches are feasible and effective to perform percutaneous procedures. In the contemporary real world, however, the left radial route is associated with shorter procedures and lower radiologic exposure than the right radial approach, independently of an operator's proficiency. Copyright © 2012 Elsevier Inc. All rights reserved.

  3. Economic impact of enoxaparin versus unfractionated heparin for venous thromboembolism prophylaxis in patients with acute ischemic stroke: a hospital perspective of the PREVAIL trial.

    Science.gov (United States)

    Pineo, Graham; Lin, Jay; Stern, Lee; Subrahmanian, Tarun; Annemans, Lieven

    2012-03-01

    The PREVAIL (Prevention of VTE [venous thromboembolism] after acute ischemic stroke with LMWH [low-molecular-weight heparin] and UFH [unfractionated heparin]) study demonstrated a 43% VTE risk reduction with enoxaparin versus UFH in patients with acute ischemic stroke (AIS). A 1% rate of symptomatic intracranial and major extracranial hemorrhage was observed in both groups. To determine the economic impact, from a hospital perspective, of enoxaparin versus UFH for VTE prophylaxis after AIS. A decision-analytic model was constructed and hospital-based costs analyzed using clinical information from PREVAIL. Total hospital costs were calculated based on mean costs in the Premier™ database and from wholesalers acquisition data. Costs were also compared in patients with severe stroke (National Institutes of Health Stroke Scale [NIHSS] score ≥14) and less severe stroke (NIHSS score <14). The average cost per patient due to VTE or bleeding events was lower with enoxaparin versus UFH ($422 vs $662, respectively; net savings $240). The average anticoagulant cost, including drug-administration cost per patient, was lower with UFH versus enoxaparin ($259 vs $360, respectively; net savings $101). However, when both clinical events and drug-acquisition costs were considered, the total hospital cost was lower with enoxaparin versus UFH ($782 vs $922, respectively; savings $140). Hospital cost-savings were greatest ($287) in patients with NIHSS scores ≥14. The higher drug cost of enoxaparin was offset by the reduction in clinical events as compared to the use of UFH for VTE prophylaxis after an AIS, particularly in patients with severe stroke. Copyright © 2011 Society of Hospital Medicine.

  4. Five-Year Outcomes of the First Pivotal Clinical Trial of Balloon-Expandable Transcatheter Aortic Valve Replacement in Japan (PREVAIL JAPAN).

    Science.gov (United States)

    Sawa, Yoshiki; Takayama, Morimasa; Goto, Tsuyoshi; Takanashi, Shuichiro; Komiya, Tatsuhiko; Tobaru, Tetsuya; Maeda, Koichi; Kuratani, Toru; Sakata, Yasushi

    2017-07-25

    Transcatheter aortic valve replacement (TAVR) has been an alternative less invasive therapy for high-surgical risk/inoperable patients with aortic valve stenosis (AS) in Japan. We report 5-year outcomes of the first pivotal clinical trial of TAVR in Japan (PREVAIL JAPAN).Methods and Results:A total of 64 patients with AS who were considered unsuitable candidates for surgery were enrolled at 3 centers in Japan (mean age: 84.3±6.1 years, female: 65.6%, STS score: 9.0±4.5%). Transfemoral approach (TF) and transapical approach (TA) was performed in 37 patients and 27 patients, respectively. At 5 years, freedom from all-cause death was 52.7% (TF: 51.3%, TA: 56.3%). Risk of all stroke at 5-year was 15.8% (TF: 8.9%, TA: 25.5%) and risk of major adverse cardiac and cerebrovascular events at 5 years was 58.0% (TF: 51.3%, TA: 69.2%). Mild or greater aortic regurgitation (AR) at 1 week was not associated with increased all-cause death at 5 years (69.1%) compared with none or trace AR (48.3%) (P=0.184). Patients with high STS score (>8) had higher mortality rate than those with low STS scores (≤8). The 5-year data from PREVAIL JAPAN show the clinical benefit of TAVR and suggest that balloon-expandable TAVR is an effective treatment option for Japanese patients with severe AS who are not suitable for surgery. (Funded by Edwards Lifesciences Limited; ClinicalTrials.gov number, NCT01113983.).

  5. 38 CFR 4.118 - Schedule of ratings-skin.

    Science.gov (United States)

    2010-07-01

    .... Note (3): Take into consideration unretouched color photographs when evaluating under these criteria...-constant systemic therapy such as corticosteroids or other immunosuppressive drugs required during the past..., or; systemic therapy such as corticosteroids or other immunosuppressive drugs required for a total...

  6. Responsive versus scheduled feeding for preterm infants.

    Science.gov (United States)

    Watson, Julie; McGuire, William

    2015-10-13

    Feeding preterm infants in response to their hunger and satiation cues (responsive, cue-based, or infant-led feeding) rather than at scheduled intervals might enhance infants' and parents' experience and satisfaction, help in the establishment of independent oral feeding, increase nutrient intake and growth rates, and allow earlier hospital discharge. To assess the effect of feeding preterm infants on a responsive basis versus feeding prescribed volumes at scheduled intervals on growth, duration of hospital stay, and parental satisfaction. We used the standard search strategy of the Cochrane Neonatal Review Group. This included searches of the Cochrane Central Register of Controlled Trials (CENTRAL, The Cochrane Library, Issue 9, 2015), MEDLINE (1966 to September 2015), EMBASE (1980 to September 2015), and CINAHL (1982 to September 2015), conference proceedings, previous reviews, and trial registries. Randomised controlled trials (RCTs) or quasi-RCTs that compared a policy of feeding preterm infants on a responsive basis versus feeding at scheduled intervals. Two review authors assessed trial eligibility and risk of bias and undertook data extraction independently. We analysed the treatment effects in the individual trials and reported the risk ratio and risk difference for dichotomous data and mean difference (MD) for continuous data, with respective 95% confidence intervals (CIs). We used a fixed-effect model in meta-analyses and explored the potential causes of heterogeneity in sensitivity analyses. We found nine eligible RCTs including 593 infants in total. These trials compared responsive with scheduled interval regimens in preterm infants in the transition phase from intragastric tube to oral feeding. The trials were generally small and contained various methodological weaknesses including lack of blinding and incomplete assessment of all randomised participants. Meta-analyses, although limited by data quality and availability, suggest that responsive feeding

  7. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  8. Rates of sustained virological response 12 weeks after the scheduled end of direct-acting antiviral (DAA)-based hepatitis C virus (HCV) therapy from the National German HCV registry: does HIV coinfection impair the response to DAA combination therapy?

    Science.gov (United States)

    Bischoff, J; Mauss, S; Cordes, C; Lutz, T; Scholten, S; Moll, A; Jäger, H; Cornberg, M; Manns, M P; Baumgarten, A; Rockstroh, J K

    2018-04-01

    The European Association for the Study of the Liver (EASL) treatment recommendations for hepatitis C no longer discriminate between HIV/hepatitis C virus (HCV)-coinfected and HCV-monoinfected patients. However, recent data from Spain are questioning these recommendations on the basis of the findings of higher relapse rates and lower cure rates in HIV/HCV-infected subjects. The aim of our study was to compare HCV cure rates in monoinfected and coinfected patients from Germany. Data acquired from the Deutsches Hepatitis C-Registry were analysed. A total of 5657 HCV-monoinfected subjects and 488 HIV/HCV-coinfected patients were included in the study. Rates of sustained virological response 12 weeks after the scheduled end of therapy (SVR12) were collected in both subgroups and in cirrhotic and noncirrhotic patients. HIV/HCV-coinfected patients were more frequently male (84.6% vs. 56.4%, respectively; P  350 cells/μL in 63.1% of HIV-positive subjects and 88.7% were on antiretroviral therapy. SVR12 rates were 90.3% (5111 of 5657) in our HCV-monoinfected cohort and 91.2% (445 of 488) in our coinfected patients. Liver cirrhosis was confirmed in 1667 of 5657 (29.5%) monoinfected patients and 84 of 488 (17.2%; P < 0.001) coinfected patients. SVR12 rates did not differ between HCV-monoinfected and HIV/HCV-coinfected patients with liver cirrhosis (87.8% vs. 89.3%, respectively; P = 0.864). A treatment duration of 8 weeks did not reduce the percentage of patients with SVR12 in either subgroup (93.7% in both groups). We found high SVR12 rates in monoinfected as well as coinfected individuals. No differences were detected between the two subgroups regardless of whether there was accompanying liver cirrhosis or a shortened treatment duration. © 2018 British HIV Association.

  9. Shift scheduling model considering workload and worker’s preference for security department

    Science.gov (United States)

    Herawati, A.; Yuniartha, D. R.; Purnama, I. L. I.; Dewi, LT

    2018-04-01

    Security department operates for 24 hours and applies shift scheduling to organize its workers as well as in hotel industry. This research has been conducted to develop shift scheduling model considering the workers physical workload using rating of perceived exertion (RPE) Borg’s Scale and workers’ preference to accommodate schedule flexibility. The mathematic model is developed in integer linear programming and results optimal solution for simple problem. Resulting shift schedule of the developed model has equally distribution shift allocation among workers to balance the physical workload and give flexibility for workers in working hours arrangement.

  10. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  11. 5 CFR 532.275 - Special wage schedules for ship surveyors in Puerto Rico.

    Science.gov (United States)

    2010-01-01

    ... in Puerto Rico. 532.275 Section 532.275 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL... schedules for ship surveyors in Puerto Rico. (a) The Department of Defense shall establish special wage schedules for nonsupervisory ship surveyors and supervisory ship surveyors in Puerto Rico. (b) Rates shall...

  12. 5 CFR 610.407 - Premium pay for holiday work for employees on compressed work schedules.

    Science.gov (United States)

    2010-01-01

    ... schedule who performs work on a holiday is entitled to basic pay, plus premium pay at a rate equal to basic pay, for the work that is not in excess of the employee's compressed work schedule for that day. For... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Premium pay for holiday work for...

  13. A IEEE 802.11e HCCA Scheduler with a Reclaiming Mechanism for Multimedia Applications

    Directory of Open Access Journals (Sweden)

    Anna Lina Ruscelli

    2014-01-01

    Full Text Available The QoS offered by the IEEE 802.11e reference scheduler is satisfactory in the case of Constant Bit Rate traffic streams, but not yet in the case of Variable Bit Rate traffic streams, whose variations stress its scheduling behavior. Despite the numerous proposed alternative schedulers with QoS, multimedia applications are looking for refined methods suitable to ensure service differentiation and dynamic update of protocol parameters. In this paper a scheduling algorithm, Unused Time Shifting Scheduler (UTSS, is deeply analyzed. It is designed to cooperate with a HCCA centralized real-time scheduler through the integration of a bandwidth reclaiming scheme, suitable to recover nonexhausted transmission time and assign that to the next polled stations. UTSS dynamically computes with an O(1 complexity transmission time providing an instantaneous resource overprovisioning. The theoretical analysis and the simulation results highlight that this injection of resources does not affect the admission control nor the centralized scheduler but is suitable to improve the performance of the centralized scheduler in terms of mean access delay, transmission queues length, bursts of traffic management, and packets drop rate. These positive effects are more relevant for highly variable bit rate traffic.

  14. Missed deadline notification in best-effort schedulers

    Science.gov (United States)

    Banachowski, Scott A.; Wu, Joel; Brandt, Scott A.

    2003-12-01

    It is common to run multimedia and other periodic, soft real-time applications on general-purpose computer systems. These systems use best-effort scheduling algorithms that cannot guarantee applications will receive responsive scheduling to meet deadline or timing requirements. We present a simple mechanism called Missed Deadline Notification (MDN) that allows applications to notify the system when they do not receive their desired level of responsiveness. Consisting of a single system call with no arguments, this simple interface allows the operating system to provide better support for soft real-time applications without any a priori information about their timing or resource needs. We implemented MDN in three different schedulers: Linux, BEST, and BeRate. We describe these implementations and their performance when running real-time applications and discuss policies to prevent applications from abusing MDN to gain extra resources.

  15. Downlink scheduling using non-orthogonal uplink beams

    KAUST Repository

    Eltayeb, Mohammed E.

    2014-04-01

    Opportunistic schedulers rely on the feedback of the channel state information of users in order to perform user selection and downlink scheduling. This feedback increases with the number of users, and can lead to inefficient use of network resources and scheduling delays. We tackle the problem of feedback design, and propose a novel class of nonorthogonal codes to feed back channel state information. Users with favorable channel conditions simultaneously transmit their channel state information via non-orthogonal beams to the base station. The proposed formulation allows the base station to identify the strong users via a simple correlation process. After deriving the minimum required code length and closed-form expressions for the feedback load and downlink capacity, we show that i) the proposed algorithm reduces the feedback load while matching the achievable rate of full feedback algorithms operating over a noiseless feedback channel, and ii) the proposed codes are superior to the Gaussian codes.

  16. Downlink scheduling using non-orthogonal uplink beams

    KAUST Repository

    Eltayeb, Mohammed E.; Al-Naffouri, Tareq Y.; Bahrami, Hamid Reza Talesh

    2014-01-01

    Opportunistic schedulers rely on the feedback of the channel state information of users in order to perform user selection and downlink scheduling. This feedback increases with the number of users, and can lead to inefficient use of network resources and scheduling delays. We tackle the problem of feedback design, and propose a novel class of nonorthogonal codes to feed back channel state information. Users with favorable channel conditions simultaneously transmit their channel state information via non-orthogonal beams to the base station. The proposed formulation allows the base station to identify the strong users via a simple correlation process. After deriving the minimum required code length and closed-form expressions for the feedback load and downlink capacity, we show that i) the proposed algorithm reduces the feedback load while matching the achievable rate of full feedback algorithms operating over a noiseless feedback channel, and ii) the proposed codes are superior to the Gaussian codes.

  17. Optimizing Unmanned Aircraft System Scheduling

    Science.gov (United States)

    2008-06-01

    ASC-U uses a deterministic algorithm to optimize over a given finite time horizon to obtain near-optimal UAS mission area assignments. ASC-U...the details of the algorithm . We set an upper bound on the total number of schedules that can be generated, so as not to create unsolvable ILPs. We...COL_MISSION_NAME)) If Trim( CStr (rMissions(iRow, COL_MISSION_REQUIRED))) <> "" Then If CLng(rMissions(iRow, COL_MISSION_REQUIRED)) > CLng

  18. Adaptive Incremental Genetic Algorithm for Task Scheduling in Cloud Environments

    Directory of Open Access Journals (Sweden)

    Kairong Duan

    2018-05-01

    Full Text Available Cloud computing is a new commercial model that enables customers to acquire large amounts of virtual resources on demand. Resources including hardware and software can be delivered as services and measured by specific usage of storage, processing, bandwidth, etc. In Cloud computing, task scheduling is a process of mapping cloud tasks to Virtual Machines (VMs. When binding the tasks to VMs, the scheduling strategy has an important influence on the efficiency of datacenter and related energy consumption. Although many traditional scheduling algorithms have been applied in various platforms, they may not work efficiently due to the large number of user requests, the variety of computation resources and complexity of Cloud environment. In this paper, we tackle the task scheduling problem which aims to minimize makespan by Genetic Algorithm (GA. We propose an incremental GA which has adaptive probabilities of crossover and mutation. The mutation and crossover rates change according to generations and also vary between individuals. Large numbers of tasks are randomly generated to simulate various scales of task scheduling problem in Cloud environment. Based on the instance types of Amazon EC2, we implemented virtual machines with different computing capacity on CloudSim. We compared the performance of the adaptive incremental GA with that of Standard GA, Min-Min, Max-Min , Simulated Annealing and Artificial Bee Colony Algorithm in finding the optimal scheme. Experimental results show that the proposed algorithm can achieve feasible solutions which have acceptable makespan with less computation time.

  19. [The effect of aluminum adjuvant and immunization schedule on immunogenicity of Sabin inactivated poliovirus vaccine].

    Science.gov (United States)

    Wang, Fang; Zhang, Ming; Xie, Bing-Feng; Cao, Han; Tong, Shao-Yong; Wang, Jun-Rong; Yu, Xiao-Ping; Tang, Yang; Yang, Jing-Ran; Sun, Ming-Bo

    2013-04-01

    To study the effect of aluminume adjuvant and immunization schedule on immunogenicity of Sabin inactivated poliovirus vaccine. Four batches of Sabin IPV were produced by different concentrations of type 1, 2, and 3 poliovirus and administrated on three-dose schedule at 0, 1, 2 months and 0, 2, 4 months on rats. Serum samples were collected one month after each dose and neutralizing antibody titers against three types poliovirus were determined by micro-neutralization assay. The GMTs of neutralizing antibodies against three types poliovirus increased significantly and the seropositivity rates were 100% in all groups after 3 doses. There was no significant difference between two immunization schedules, and the 0, 2, 4 month schedule could induce higher level neutralizing antibody compared to the 0, 1, 2 month schedule. The groups with aluminum adjuvant could induce higher level neutralizing antibody compared to the groups without adjuvant. Aluminum djuvant and immunization schedule could improve the immunogenicity of Sabin IPV.

  20. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  1. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  2. Management of acute basilar artery occlusion: should any treatment strategy prevail?

    Science.gov (United States)

    Dornak, Tomas; Herzig, Roman; Sanak, Daniel; Skoloudik, David

    2014-12-01

    Acute basilar artery occlusion (BAO) is relatively infrequent form of acute ischemic stroke associated with severe and persisting neurological deficit and high mortality rate (to 86%). Early recanalization is essential for good clinical outcome but the most effective treatment approach remains unestablished. Several treatment strategies are currently available but their safety and efficacy have only been tested in retrospective/prospective case series. Randomized controlled trials (RCTs) are lacking. We searched the PubMed database for assessments of recanalization rate and clinical outcome in BAO patients treated with various treatment methods. The results show that antithrombotics are least effective while specific reperfusion therapies including intravenous thrombolysis (IVT) and various types of intra-arterial therapy (IAT) are more so. Less than half of BAO patients reach independent outcome following IVT with a recanalization rate 52-78%. Even though IAT recanalizes BAO more frequently (in up to 100%), the higher recanalization rate is not necessarily associated with better outcome. Good clinical outcome is strongly dependent on recanalization time. Thus, the concept of bridging therapy, combining widely available IVT with IAT, was introduced and is usually considered a rescue strategy in non-responders to IV alteplase. A trend to better outcome in patients treated with bridging therapy in some studies, has to be confirmed by large RCTs.

  3. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  4. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  5. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  6. Comparative Study of 4G Technology, Applications and Compatibility in Prevailing Networks

    OpenAIRE

    Ishan Shah; Shiv Shukla; Rohan Shrotriya; Nupur Mehta; Nirja Mehta; Shivang Bakliwal

    2012-01-01

    With increasing end user demands for wider service due to the rapid growth and variety of IT (information technology) industry, the service with the data rate of 30 Mbps cannot accommodate the future mobile multimedia environment. The Continuous improvement in semiconductors and computing technologies has encouraged service providers to consider implementing the 4G-enabled services to the customers. This paper describes the applications of 4G technology considering the importance of switching...

  7. Joint Network Coding and Opportunistic Scheduling for the Bidirectional Relay Channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-05-27

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users’ transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited.

  8. Joint Network Coding and Opportunistic Scheduling for the Bidirectional Relay Channel

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein; Alouini, Mohamed-Slim; Zafar, Ammar

    2013-01-01

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users’ transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited.

  9. ENHANCED HYBRID PSO – ACO ALGORITHM FOR GRID SCHEDULING

    Directory of Open Access Journals (Sweden)

    P. Mathiyalagan

    2010-07-01

    Full Text Available Grid computing is a high performance computing environment to solve larger scale computational demands. Grid computing contains resource management, task scheduling, security problems, information management and so on. Task scheduling is a fundamental issue in achieving high performance in grid computing systems. A computational GRID is typically heterogeneous in the sense that it combines clusters of varying sizes, and different clusters typically contains processing elements with different level of performance. In this, heuristic approaches based on particle swarm optimization and ant colony optimization algorithms are adopted for solving task scheduling problems in grid environment. Particle Swarm Optimization (PSO is one of the latest evolutionary optimization techniques by nature. It has the better ability of global searching and has been successfully applied to many areas such as, neural network training etc. Due to the linear decreasing of inertia weight in PSO the convergence rate becomes faster, which leads to the minimal makespan time when used for scheduling. To make the convergence rate faster, the PSO algorithm is improved by modifying the inertia parameter, such that it produces better performance and gives an optimized result. The ACO algorithm is improved by modifying the pheromone updating rule. ACO algorithm is hybridized with PSO algorithm for efficient result and better convergence in PSO algorithm.

  10. Basic Features of Customer Satisfaction with Train Schedules

    Science.gov (United States)

    Murakoshi, Akiko; Kunimatsu, Taketoshi; Saito, Ayano

    This paper aims to reveal the fundamental features of customer satisfaction with train schedules, which is one of the most basic services provided by a railway company. A customer satisfaction survey of passengers who frequently utilize three lines in the metropolitan area was conducted; we obtained the following findings: (a) out of nine factors to evaluate a train schedule from a passenger's viewpoint, the four most important ones are the frequency of trains running, punctuality, congestion rate, and time distance; (b) the ride-frequency influences the degree of satisfaction with train schedules in a particular line; and (c) it is important to set a numeric goal for the level of customer satisfaction by grasping the relationship between the transport service and a passenger's satisfaction with that service. The difference between customer satisfaction and passenger disutility is also discussed. The findings are expected to help conduct customer satisfaction surveys and also to form the basis for establishing a method by which to evaluate a train schedule from passengers' satisfaction ratings.

  11. Opportunistic Nonorthogonal Packet Scheduling in Fixed Broadband Wireless Access Networks

    Directory of Open Access Journals (Sweden)

    Ahmed Mohamed H

    2006-01-01

    Full Text Available In order to mitigate high cochannel interference resulting from dense channel reuse, the interference management issues are often considered as essential part of scheduling schemes in fixed broadband wireless access (FBWA networks. To that end, a series of literature has been published recently, in which a group of base stations forms an interferer group (downlink transmissions from each base station become dominant interference for the users in other in-group base stations, and the scheduling scheme deployed in the group allows only one base station to transmit at a time. As a result of time orthogonality in transmissions, the dominant cochannel interferers are prevented, and hence the packet error rate can be improved. However, prohibiting concurrent transmissions in these orthogonal schemes introduces throughput penalty as well as higher end-to-end packet delay which might not be desirable for real-time services. In this paper, we utilize opportunistic nonorthogonality among the in-group transmissions whenever possible and propose a novel transmission scheduling scheme for FBWA networks. The proposed scheme, in contrast to the proactive interference avoidance techniques, strives for the improvements in delay and throughput efficiency. To facilitate opportunistic nonorthogonal transmissions in the interferer group, estimation of signal-to-interference-plus-noise ratio (SINR is required at the scheduler. We have observed from simulations that the proposed scheme outperforms the reference orthogonal scheme in terms of spectral efficiency, mean packet delay, and packet dropping rate.

  12. Assorted interactions of amino acids prevailing in aqueous vitamin C solutions probed by physicochemical and ab-initio contrivances

    Science.gov (United States)

    Das, Koyeli; Roy, Milan Chandra; Rajbanshi, Biplab; Roy, Mahendra Nath

    2017-11-01

    Qualitative and quantitative analysis of molecular interaction prevailing in tyrosine and tryptophan in aqueous solution of vitamin C have been probed by thermophysical properties. The apparent molar volume (ϕV), viscosity B-coefficient, molal refraction (RM) of tyrosine and tryptophan have been studied in aqueous vitamin C solutions at diverse temperatures via Masson equation which deduced solute-solvent and solute-solute interactions, respectively. Spectroscopic study along with physicochemical and computational techniques provides lots of interesting and highly significant insights of the model biological systems. The overall results established strong solute-solvent interactions between studied amino acids and vitamin C mixture in the ternary solutions.

  13. Types of analysis of trompenaar's (1994 organizational culture prevailing in the area of controllership in family businesses in textile industry

    Directory of Open Access Journals (Sweden)

    Vanderlei dos Santos

    2010-01-01

    Full Text Available The study aims to identify the types of analysis of Trompenaar's (1994 organizational culture prevailing in the area of controllership in family businesses in textile industry. Descriptive research was performed, with quantitative and qualitative approach, using a multiple case study. Data were collected through interviews with the controller of the companies. In the four basic culture types suggested by Trompenaars (1994, it is concluded that there isn´t a pure kind, but there is a strong presence of family culture among the companies surveyed in dimensions relationship between employees, attitude in relation to the ways of change, forms of motivation and reward

  14. Dosing strategy based on prevailing aminoglycoside minimum inhibitory concentration in India: Evidence and issues

    Directory of Open Access Journals (Sweden)

    Balaji Veeraraghavan

    2017-01-01

    Full Text Available Aminoglycosides are important agents used for treating drug-resistant infections. The current dosing regimen of aminoglycosides does not achieve sufficient serum level concentration for the infected bacterial pathogen interpreted as susceptible based on laboratory testing. Minimum inhibitory concentration was determined for nearly 2000 isolates of Enterobacteriaceae and Pseudomonas aeruginosa by broth microdilution method. Results were interpreted based on CLSI and EUCAST interpretative criteria and the inconsistencies in the susceptibility profile were noted. This study provides insights into the inconsistencies existing in the laboratory interpretation and the corresponding clinical success rates. This urges the need for revising clinical breakpoints for amikacin, to resolve under dosing leading to clinical failure.

  15. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  16. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  17. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event is availa......CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event...... is available. The CHI'13 Interactive Schedule helps attendees navigate this wealth of video content in order to identify events they would like to attend. It consists of a number of large display screens throughout the conference venue which cycle through a video playlist of events. Attendees can interact...

  18. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  19. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  20. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  1. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  2. Management of Temporal Constraints for Factory Scheduling.

    Science.gov (United States)

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  3. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  4. Trustable Virtual Machine Scheduling in a Cloud

    OpenAIRE

    Hermenier , Fabien; Henrio , Ludovic

    2017-01-01

    International audience; In an Infrastructure As A Service (IaaS) cloud, the scheduler deploys VMs to servers according to service level objectives (SLOs). Clients and service providers must both trust the infrastructure. In particular they must be sure that the VM scheduler takes decisions that are consistent with its advertised behaviour. The difficulties to master every theoretical and practical aspects of a VM scheduler implementation leads however to faulty behaviours that break SLOs and ...

  5. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  6. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  7. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  8. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  9. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  10. Home Health Care for California's Injured Workers: Options for Implementing a Fee Schedule.

    Science.gov (United States)

    Wynn, Barbara O; Boustead, Anne

    2015-07-15

    The California Department of Industrial Relations/Division of Worker's Compensation asked RAND to provide technical assistance in developing a fee schedule for home health services provided to injured workers. The fee schedule needs to address the full spectrum of home health services ranging from skilled nursing and therapy services to unskilled personal care or chore services that may be provided by family members. RAND researchers consulted with stakeholders in the California workers' compensation system to outline issues the fee schedule should address, reviewed home health fee schedules used by other payers, and conducted interviews with WC administrators from other jurisdictions to elicit their experiences. California stakeholders identified unskilled attendant services as most problematic in determining need and payment rates, particularly services furnished by family members. RAND researchers concentrated on fee schedule options that would result in a single fee schedule covering the full range of home health care services furnished to injured workers and made three sets of recommendations. The first set pertains to obtaining additional information that would highlight the policy issues likely to occur with the implementation of the fee schedule and alternatives for assessing an injured worker's home health care needs. Another approach conforms most closely with the Labor Code requirements. It would integrate the fee schedules used by Medicare, In-Home Health Supportive Services, and the federal Office of Workers' Compensation. The third approach would base the home health fee schedule on rules used by the federal Office of Workers' Compensation.

  11. Radiolysis of cesium iodide solutions in conditions prevailing in a pressurized water reactor severe accident

    International Nuclear Information System (INIS)

    Lucas, M.

    1988-01-01

    Measurements were made of I/sub 2/ formed when aqueous cesium iodide (CsI) solutions were exposed to two temperatures, 43 and 95 0 C, with irradiation. Iodine partition coefficients were obtained from the experiments. The parameters varied were dose, CsI concentration, and Cs/sub 2/CO/sub 3/ concentration, in the presence of air-carbon dioxide and air-carbon dioxide-hydrogen mixtures, to provide information to calculate the form in which iodine released from fuel as CsI in a reactor accident might reach the environment. In a series of experiments, a two-compartment cell was used to trap the gaseous iodine produced. In this case, it was found that the quantity of gaseous iodine produced increased approximately linearly with the dose (at the dose rate used)

  12. Taking the lag out of jet lag through model-based schedule design.

    Science.gov (United States)

    Dean, Dennis A; Forger, Daniel B; Klerman, Elizabeth B

    2009-06-01

    Travel across multiple time zones results in desynchronization of environmental time cues and the sleep-wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep-wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep-wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep-wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep-wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions.

  13. Taking the lag out of jet lag through model-based schedule design.

    Directory of Open Access Journals (Sweden)

    Dennis A Dean

    2009-06-01

    Full Text Available Travel across multiple time zones results in desynchronization of environmental time cues and the sleep-wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep-wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep-wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep-wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep-wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions.

  14. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  15. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  16. 15 CFR 700.14 - Preferential scheduling.

    Science.gov (United States)

    2010-01-01

    ...) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Industrial Priorities § 700.14 Preferential scheduling. (a) A...

  17. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  18. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  19. The contributions of the cerebellum in sensorimotor control: what are the prevailing opinions which will guide forthcoming studies?

    Science.gov (United States)

    Manto, Mario; Oulad Ben Taib, Nordeyn

    2013-06-01

    Although considerable progress has been made in developing models of cerebellar function in sensorimotor control, the exact nature of the basic operations performed by the cerebellum remain elusive. Several major theories have emerged these last decades. According to the hypothesis of Marr and Albus, the climbing fiber input carries an error signal weakening the strength of a subset of parallel fibers/Purkinje neurons synapses in the cerebellar cortex. Cerebellar circuits would gain the control of movement through trial and error. The hypothesis of internal models emulating movements is currently highly cited. There is a general agreement that (1) the central nervous system has to cope with an intrinsic time delay of sensory feedback related to motor activities and (2) estimations of future motor states are essential to perform fast and accurate movements. According to this second theory, cerebellar dysmetria, one of the cardinal cerebellar deficits, would result from a distorted predictive control. A third popular theory relates to the inverse models that would be stored in the cerebellum. Acquisition of a motor act would require forward models, and the acquisition process itself would generate an inverse model to allow an unconscious coordinated movement. Recently, an international panel of experts from various disciplines discussed the prevailing opinions in a consensus statement and tried to extract their clinical relevance in terms of pathogenesis of the clinical symptoms. Although a consensus is still not reached, the prevailing opinions provide a sound framework to conduct novel studies and try to discover the secrets of cerebellar circuits.

  20. Influences on cocaine tolerance assessed under a multiple conjunctive schedule of reinforcement.

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N

    2009-11-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the effects of cocaine on key-pecking responses of White Carneau pigeons maintained under a three-component multiple conjunctive FI (10 s, 30 s, & 120 s) FR (5 responses) schedule of food presentation. Dose-effect curves representing the effects of presession cocaine on responding were assessed in the context of (1) acute administration of cocaine (2) chronic administration of cocaine and (3) daily administration of saline. Chronic administration of cocaine generally resulted in tolerance to the response-rate decreasing effects of cocaine, and that tolerance was generally independent of relative FI value, as measured by changes in ED50 values. Daily administration of saline decreased ED50 values to those observed when cocaine was administered acutely. The results show that adding a FR requirement to FI schedules is not sufficient to produce schedule-parameter-specific tolerance. Tolerance to cocaine was generally independent of FI-parameter under the present conjunctive schedules, indicating that a ratio requirement, per se, is not sufficient for tolerance to be dependent on FI parameter.

  1. Maternal methadone dosing schedule and fetal neurobehavior

    Science.gov (United States)

    Jansson, Lauren M.; DiPietro, Janet A.; Velez, Martha; Elko, Andrea; Knauer, Heather; Kivlighan, Katie T.

    2008-01-01

    Objective Daily methadone maintenance is the standard of care for opiate dependency during pregnancy. Previous research has indicated that single-dose maternal methadone administration significantly suppresses fetal neurobehaviors. The purpose of this study was to determine if split-dosing would have less impact on fetal neurobehavior than single-dose administration. Methods Forty methadone-maintained women were evaluated at peak and trough maternal methadone levels on single- and split-dosing schedules. Monitoring sessions occurred at 36 and 37 weeks gestation in a counterbalanced study design. Fetal measures included heart rate, variability, accelerations, motor activity and fetal movement-heart rate coupling (FM-FHR). Maternal measures included heart period, variability, skin conductance, respiration and vagal tone. Repeated measure analysis of variance was used to evaluate within-subject changes between split- and single-dosing regimens. Results All fetal neurobehavioral parameters were suppressed by maternal methadone administration, regardless of dosing regimen. Fetal parameters at peak were significantly lower during single vs. split methadone administration. FM-FHR coupling was less suppressed from trough to peak during split-dosing vs. single-dosing. Maternal physiologic parameters were generally unaffected by dosing condition. Conclusion Split- dosed fetuses displayed less neurobehavioral suppression from trough to peak maternal methadone levels as compared to single-dosed fetuses. Split-dosing may be beneficial for methadone-maintained pregnant women. PMID:19085624

  2. Where "Old Heads" Prevail: Inmate Hierarchy in a Men's Prison Unit.

    Science.gov (United States)

    Kreager, Derek A; Young, Jacob T N; Haynie, Dana L; Bouchard, Martin; Schaefer, David R; Zajac, Gary

    2017-01-01

    Research of inmate social order is a once-vibrant area that receded just as American incarceration rates climbed and the country's carceral contexts dramatically changed. This study reengages inmate society with an abductive mixed methods investigation of informal status within a contemporary men's prison unit. The authors collect narrative and social network data from 133 male inmates housed in a unit of a Pennsylvania medium-security prison. Analyses of inmate narratives suggest that unit "old heads" provide collective goods in the form of mentoring and role modeling that foster a positive and stable peer environment. This hypothesis is then tested with Exponential Random Graph Models (ERGMs) of peer nomination data. The ERGM results complement the qualitative analysis and suggest that older inmates and those who have been on the unit longer are perceived by their peers as powerful and influential. Both analytical strategies point to the maturity of aging and the acquisition of local knowledge as important for attaining informal status in the unit. In sum, this mixed methods case study extends theoretical insights of classic prison ethnographies, adds quantifiable results capable of future replication, and points to a growing population of older inmates as important for contemporary prison social organization.

  3. Transmission Scheduling and Routing Algorithms for Delay Tolerant Networks

    Science.gov (United States)

    Dudukovich, Rachel; Raible, Daniel E.

    2016-01-01

    The challenges of data processing, transmission scheduling and routing within a space network present a multi-criteria optimization problem. Long delays, intermittent connectivity, asymmetric data rates and potentially high error rates make traditional networking approaches unsuitable. The delay tolerant networking architecture and protocols attempt to mitigate many of these issues, yet transmission scheduling is largely manually configured and routes are determined by a static contact routing graph. A high level of variability exists among the requirements and environmental characteristics of different missions, some of which may allow for the use of more opportunistic routing methods. In all cases, resource allocation and constraints must be balanced with the optimization of data throughput and quality of service. Much work has been done researching routing techniques for terrestrial-based challenged networks in an attempt to optimize contact opportunities and resource usage. This paper examines several popular methods to determine their potential applicability to space networks.

  4. Scientific or rule-of-thumb techniques of ground-water management--Which will prevail?

    Science.gov (United States)

    McGuinness, Charles Lee

    1969-01-01

    Emphasis in ground-water development, once directed largely to quantitatively minor (but sociologically vital) service of human and stock needs, is shifting: aquifers are treated as possible regulating reservoirs managed conjunctively with surface water. Too, emphasis on reducing stream pollution is stimulating interest in aquifers as possible waste-storage media. Such management of aquifers requires vast amounts of data plus a much better understanding of aquifer-system behavior than now exists. Implicit in this deficiency of knowledge is a need for much new research, lest aquifers be managed according to ineffective rule-of-thumb standards, or even abandoned as unmanageable. The geohydrologist's task is to define both internal and boundary characteristics of aquifer systems. Stratigraphy is a primary determinant of these characteristics, but stratigraphically minor features may make aquifers transcend stratigraphic boundaries. For example, a structurally insignificant fracture may carry more water than a major fault; a minor stratigraphic discontinuity may be a major hydrologic boundary. Hence, there is a need for ways of defining aquifer boundaries and quantifying aquifer and confining-bed characteristics that are very different from ordinary stratigraphic techniques. Among critical needs are techniques for measuring crossbed permeability; for extrapolating and interpolating point data on direction and magnitude of permeability in defining aquifer geometry; and for accurately measuring geochemical properties of water and aquifer material, and interpreting those measurements in terms of source of water, rate of movement, and waste-sorbing capacities of aquifers and of confining beds--in general, techniques adequate for predicting aquifer response to imposed forces whether static, hydraulic, thermal, or chemical. Only when such predictions can be made routinely can aquifer characteristics be inserted into a master model that incorporates both the hydrologic and

  5. Nonlinear observer output-feedback MPC treatment scheduling for HIV

    Directory of Open Access Journals (Sweden)

    Zurakowski Ryan

    2011-05-01

    Full Text Available Abstract Background Mathematical models of the immune response to the Human Immunodeficiency Virus demonstrate the potential for dynamic schedules of Highly Active Anti-Retroviral Therapy to enhance Cytotoxic Lymphocyte-mediated control of HIV infection. Methods In previous work we have developed a model predictive control (MPC based method for determining optimal treatment interruption schedules for this purpose. In this paper, we introduce a nonlinear observer for the HIV-immune response system and an integrated output-feedback MPC approach for implementing the treatment interruption scheduling algorithm using the easily available viral load measurements. We use Monte-Carlo approaches to test robustness of the algorithm. Results The nonlinear observer shows robust state tracking while preserving state positivity both for continuous and discrete measurements. The integrated output-feedback MPC algorithm stabilizes the desired steady-state. Monte-Carlo testing shows significant robustness to modeling error, with 90% success rates in stabilizing the desired steady-state with 15% variance from nominal on all model parameters. Conclusions The possibility of enhancing immune responsiveness to HIV through dynamic scheduling of treatment is exciting. Output-feedback Model Predictive Control is uniquely well-suited to solutions of these types of problems. The unique constraints of state positivity and very slow sampling are addressable by using a special-purpose nonlinear state estimator, as described in this paper. This shows the possibility of using output-feedback MPC-based algorithms for this purpose.

  6. Washington's marine oil spill compensation schedule - simplified resource damage assessment

    International Nuclear Information System (INIS)

    Geselbracht, L.; Logan, R.

    1993-01-01

    The Washington State Preassessment Screening and Oil Spill Compensation Schedule Rule (Chapter 173-183 Washington Administrative Code), which simplifies natural resource damage assessment for many oil spill cases, became effective in May 1992. The approach described in the rule incorporates a number of preconstructed rankings that rate environmental sensitivity and the propensity of spilled oil to cause environmental harm. The rule also provides guidance regarding how damages calculated under the schedule should be reduced to take into account actions taken by the responsible party that reduce environmental injury. To apply the compensation schedule to marine estuarine spills, the resource trustees need only collect a limited amount of information such as type of product spilled, number of gallons spilled, compensation schedule subregions the spill entered, season of greatest spill impact, percent coverage of habitats affected by the spill, and actions taken by the responsible party. The result of adding a simplified tool to the existing assortment of damage assessment approaches is that resource trustees will now be able to assess damages for most oil spill cases and shift more effort than was possible in the past to resource restoration

  7. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Science.gov (United States)

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  8. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Directory of Open Access Journals (Sweden)

    Jinxiang Dong

    2008-07-01

    Full Text Available There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting crosslayer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An eventdriven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN.

  9. Diagnosis and Treatment of Typhoid Fever and Associated Prevailing Drug Resistance in Northern Ethiopia.

    Science.gov (United States)

    Wasihun, Araya Gebreyesus; Wlekidan, Letemichael Negash; Gebremariam, Senay Aregawi; Welderufael, Abadi Luel; Muthupandian, Saravanan; Haile, Tadesse Dejenie; Dejene, Tsehaye Asmelash

    2015-06-01

    To determine diagnostic value of the Widal test, treatment pattern of febrile patients and antimicrobial drug susceptibility pattern of blood isolates. Using cross sectional methods, blood samples were collected for culture and Widal test from 502 febrile outpatients attending Mekelle hospital and Mekelle health center with similar symptoms to typhoid. Sensitivity, specificity for anti-TH and anti-TO titers using culture confirmed typhoid fever cases, and Kappa agreement between Titer and slide Widal tests were calculated. Treatment pattern of patients and antimicrobial susceptibility pattern of the blood isolates was assessed. From the 502 febrile patients, 8(1.6%) of them had culture-proven typhoid fever. However, patients who have results indicative of recent infection by O and H antigens of the Widal slide agglutination test were 343 (68.5%), with specificity and sensitivity of 33% and 100%, respectively. Over prescription of antibiotics was seen by Widal slide test for Ciprofloxacin 268 (76.1%), Amoxicillin- Clavulanic acid 9(2.6%), Amoxicillin 8(2.4%) and Chloranphenicol 8(2.4%). Tube titer positivity was seen in 23(5.3%) patients with 75% sensitivity and 95.8% specificity. Widal slide and Tube titer tests showed poor agreement for both antigens (kappa=0.02 for O) and (Kappa=0.09 for H). A single anti-TH titer of ≥ 1:160 and anti-TO titer ≥ 1:80 higher in our study showed an indication for typhoid fever infection. Drug resistance pattern of blood isolates ranges from 0-89.7% for gram positive and 0-100% for Gram negative, with an overall multi-drug resistance rate of 61.7%. Patients were wrongly diagnosed and treated for typhoid fever by Widal test. The tube titration method was relatively good but still had poor sensitivity. Blood isolates showed multi drug resistance, which may be due to the indiscriminate prescription as seen in this study. Based on our results, the slide Widal test is not helpful in the diagnosis of typhoid, hence other tests with

  10. Military Free Fall Scheduling And Manifest Optimization Model

    Science.gov (United States)

    2016-12-01

    zone. As interest in qualifying more personnel increased, the course expanded. By the mid-1990s, Reyes explains, a new location was required to better...Since 2005, the Chilean Professional Soccer Association has used operations research techniques to schedule professional leagues in Chile . These...a new parachute the students are using, the RA-1. The RA-1 parachute has a longer glide ratio, which means the rate of descent is slower than with

  11. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  12. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  13. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  14. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  15. A dynamic approach to vehicle scheduling

    NARCIS (Netherlands)

    D. Huisman (Dennis); R. Freling (Richard); A.P.M. Wagelmans (Albert)

    2001-01-01

    textabstractThis paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our

  16. State Teacher Salary Schedules. Policy Analysis

    Science.gov (United States)

    Griffith, Michael

    2016-01-01

    In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…

  17. Evolutionary Scheduler for the Deep Space Network

    Science.gov (United States)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  18. Decay-usage scheduling in multiprocessors

    NARCIS (Netherlands)

    Epema, D.H.J.

    1998-01-01

    Decay-usage scheduling is a priority-aging time-sharing scheduling policy capable of dealing with a workload of both interactive and batch jobs by decreasing the priority of a job when it acquires CPU time, and by increasing its priority when it does not use the (a) CPU. In this article we deal with

  19. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  20. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... domestic law and international conventions and agreements adopted by the United States; such terminal... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  1. 21 CFR 1308.13 - Schedule III.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III. 1308.13 Section 1308.13 Food and... opposite it. (b) Stimulants. Unless specifically excepted or unless listed in another schedule, any... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical...

  2. Management Matters. Changing to Flexible Scheduling

    Science.gov (United States)

    Pappas, Marjorie L.

    2005-01-01

    Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…

  3. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  4. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  5. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction and Schedule After nearly seven months of concentrated effort, the installation of services on YB0 moved off the CMS critical path in late November. In line with v36 planning provisions, the additional time needed to finish this challeng¬ing task was accommodated by reducing sequential dependencies between assembly tasks, putting more tasks (especially heavy logistic movements) in parallel with activities on, or within, the central wheel. Thus the lowering of wheels YB-1 and YB -2 and of disk YE-3 is already complete, the latter made possible, in the shadow of YB0 work, by inverting the order of the 3 endcap disks in the surface building. Weather conditions permitting, the Tracker will be transported to point 5 during CMS week for insertion in EB before CERN closes. The lowering of the last two disks will take place mid- and end-of January, respectively. Thus central beampipe installation can be confidently planned to start in February as foreseen, allowing closure of CMS in time for CRA...

  6. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  7. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Since the lowering of YB0 in February, less spectacular but nonetheless crucial progress has been made along the critical path to CMS completion. The YB0 has been aligned with the beamline to a fraction of a mm, and the HCAL has been fully installed. Cabling scaffolding for YB0 services has been built and one half (-z end) of the ECAL barrel has been installed. The YB0 services installation has begun, with two of the major technical challenges delaying bulk installation, namely PP1 detailed design, manufacture and installation plus Tracker cooling pipe insulation, now apparently solved. Significant difficulties in detailed design, integration and procurement of cable ducts remain. Despite this, the design of the +end is close to complete, and Tracker power cable installation on two sectors of the +end is well advanced. A new master schedule, v36.0, is being prepared to account for the updated actual situation at point 5 and for the revised LHC machine planning. Safety The enormous amount of...

  8. 20 CFR 655.207 - Adverse effect rates.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Adverse effect rates. 655.207 Section 655.207... Agricultural Employment § 655.207 Adverse effect rates. (a) Except as otherwise provided in this section, the adverse effect rates for all agricultural and logging employment shall be the prevailing wage rates in the...

  9. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  10. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  11. A Hybrid Node Scheduling Approach Based on Energy Efficient Chain Routing for WSN

    Directory of Open Access Journals (Sweden)

    Yimei Kang

    2014-04-01

    Full Text Available Energy efficiency is usually a significant goal in wireless sensor networks (WSNs. In this work, an energy efficient chain (EEC data routing approach is first presented. The coverage and connectivity of WSNs are discussed based on EEC. A hybrid node scheduling approach is then proposed. It includes sleep scheduling for cyclically monitoring regions of interest in time-driven modes and wakeup scheduling for tracking emergency events in event-driven modes. A failure rate is introduced to the sleep scheduling to improve the reliability of the system. A wakeup sensor threshold and a sleep time threshold are introduced in the wakeup scheduling to reduce the consumption of energy to the possible extent. The results of the simulation show that the proposed algorithm can extend the effective lifetime of the network to twice that of PEAS. In addition, the proposed methods are computing efficient because they are very simple to implement.

  12. Using multiple schedules during functional communication training to promote rapid transfer of treatment effects.

    Science.gov (United States)

    Fisher, Wayne W; Greer, Brian D; Fuhrman, Ashley M; Querim, Angie C

    2015-12-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects across settings and therapists. With 2 children, we conducted FCT in the context of mixed (baseline) and multiple (treatment) schedules introduced across settings or therapists using a multiple baseline design. Results indicated that when the multiple schedules were introduced, the functional communication response came under rapid discriminative control, and problem behavior remained at near-zero rates. We extended these findings with another individual by using a more traditional baseline in which problem behavior produced reinforcement. Results replicated those of the previous participants and showed rapid reductions in problem behavior when multiple schedules were implemented across settings. © Society for the Experimental Analysis of Behavior.

  13. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  14. Radiographic progression with nonrising PSA in metastatic castration-resistant prostate cancer: post hoc analysis of PREVAIL.

    Science.gov (United States)

    Bryce, A H; Alumkal, J J; Armstrong, A; Higano, C S; Iversen, P; Sternberg, C N; Rathkopf, D; Loriot, Y; de Bono, J; Tombal, B; Abhyankar, S; Lin, P; Krivoshik, A; Phung, D; Beer, T M

    2017-06-01

    Advanced prostate cancer is a phenotypically diverse disease that evolves through multiple clinical courses. PSA level is the most widely used parameter for disease monitoring, but it has well-recognized limitations. Unlike in clinical trials, in practice, clinicians may rely on PSA monitoring alone to determine disease status on therapy. This approach has not been adequately tested. Chemotherapy-naive asymptomatic or mildly symptomatic men (n=872) with metastatic castration-resistant prostate cancer (mCRPC) who were treated with the androgen receptor inhibitor enzalutamide in the PREVAIL study were analyzed post hoc for rising versus nonrising PSA (empirically defined as >1.05 vs ⩽1.05 times the PSA level from 3 months earlier) at the time of radiographic progression. Clinical characteristics and disease outcomes were compared between the rising and nonrising PSA groups. Of 265 PREVAIL patients with radiographic progression and evaluable PSA levels on the enzalutamide arm, nearly one-quarter had a nonrising PSA. Median progression-free survival in this cohort was 8.3 months versus 11.1 months in the rising PSA cohort (hazard ratio 1.68; 95% confidence interval 1.26-2.23); overall survival was similar between the two groups, although less than half of patients in either group were still at risk at 24 months. Baseline clinical characteristics of the two groups were similar. Non-rising PSA at radiographic progression is a common phenomenon in mCRPC patients treated with enzalutamide. As restaging in advanced prostate cancer patients is often guided by increases in PSA levels, our results demonstrate that disease progression on enzalutamide can occur without rising PSA levels. Therefore, a disease monitoring strategy that includes imaging not entirely reliant on serial serum PSA measurement may more accurately identify disease progression.

  15. One-year multicentre outcomes of transapical aortic valve implantation using the SAPIEN XT™ valve: the PREVAIL transapical study.

    Science.gov (United States)

    Walther, Thomas; Thielmann, Matthias; Kempfert, Joerg; Schroefel, Holger; Wimmer-Greinecker, Gerhard; Treede, Hendrik; Wahlers, Thorsten; Wendler, Olaf

    2013-05-01

    The study aimed to evaluate 1-year outcomes of the multicentre PREVAIL transapical (TA) study of TA-aortic valve implantation (AVI) in high-risk patients. From September 2009 to August 2010, a total of 150 patients, aged 81.6 ± 5.8 years, 40.7% female, were included at 12 European TA-AVI experienced sites. Patients received 23 (n = 36), 26 (n = 57) and 29 mm (n = 57) second-generation SAPIEN XT™ (Edwards Lifesciences, Irvine, CA, USA) valves. The mean logistic EuroSCORE was 24.3 ± 7.0, and mean Society Thoracic Surgeons score was 7.5 ± 4.4%. Survival was 91.3% at 30 days and 77.9% at 1 year. Subgroup analysis revealed survivals of 91.7/88.9, 86.0/70.2, 96.55/91.2% for patients receiving 23-, 26- and 29-mm valves at 30 days and at 1 year, respectively. Transthoracic echocardiography revealed preserved left ventricular ejection fraction and low gradients. Aortic incompetence was none in 41/48, trace 30/36, mild 22/12 and moderate in 7/4% at discharge and 1 year. Walking distance increased from 221 (postimplant) to 284 m (at 1 year, P = 0.0004). Three patients required reoperation due to increasing aortic incompetence during follow-up. Causes of mortality at 1 year were cardiac (n = 7), stroke (n = 1) and others (n = 5). The European PREVAIL multicentre trial demonstrates good functionality and good outcomes for TA-AVI using the second-generation SAPIEN XT prosthesis and the ASCENDRA-II delivery system. The 29-mm SAPIEN XT valve was successfully introduced and showed excellent results.

  16. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  17. Sustainable employability in shiftwork: related to types of work schedule rather than age.

    Science.gov (United States)

    Peters, Velibor; Engels, Josephine A; de Rijk, Angelique E; Nijhuis, Frans J N

    2015-10-01

    There is scarce research on age and sustainable employability of nurses working in various types of work schedules. Earlier research showed that nurses working in work schedules differ regarding age. Different operationalisations of age might explain variations in sustainable employability. Therefore, the aim of this study was to investigate how nurses working in various types of work schedule differ regarding sustainable employability, and the role that age plays in these differences. Age was defined as chronological age, organisational age, life-span age, and functional age. Questionnaires were distributed to 974 Dutch nurses in residential elder care (response rate 51 %) with questions about the type of work schedule, aspects of sustainable employability, various operationalisations of age, and registered sickness absence data were used. Nurses working in various types of work schedules differed regarding aspects of sustainable employability, also when operationalisations of age were added. The 'life-span age' was directly related to aspects of sustainable employability. Statistically, work ability and job satisfaction were only explained by varying operationalisations of age. Nurses' sustainable employability appeared to be mainly related to differences between the types of work schedule rather than age. Fixed early shifts are characterised by the most positive aspects of sustainable employability, and three rotating schedules score worst. To improve sustainable employability, organisations should implement a system in which nurses with different types of work schedule are monitored in combination with their life-span perspective.

  18. Secure Scientific Applications Scheduling Technique for Cloud Computing Environment Using Global League Championship Algorithm

    Science.gov (United States)

    Abdulhamid, Shafi’i Muhammad; Abd Latiff, Muhammad Shafie; Abdul-Salaam, Gaddafi; Hussain Madni, Syed Hamid

    2016-01-01

    Cloud computing system is a huge cluster of interconnected servers residing in a datacenter and dynamically provisioned to clients on-demand via a front-end interface. Scientific applications scheduling in the cloud computing environment is identified as NP-hard problem due to the dynamic nature of heterogeneous resources. Recently, a number of metaheuristics optimization schemes have been applied to address the challenges of applications scheduling in the cloud system, without much emphasis on the issue of secure global scheduling. In this paper, scientific applications scheduling techniques using the Global League Championship Algorithm (GBLCA) optimization technique is first presented for global task scheduling in the cloud environment. The experiment is carried out using CloudSim simulator. The experimental results show that, the proposed GBLCA technique produced remarkable performance improvement rate on the makespan that ranges between 14.44% to 46.41%. It also shows significant reduction in the time taken to securely schedule applications as parametrically measured in terms of the response time. In view of the experimental results, the proposed technique provides better-quality scheduling solution that is suitable for scientific applications task execution in the Cloud Computing environment than the MinMin, MaxMin, Genetic Algorithm (GA) and Ant Colony Optimization (ACO) scheduling techniques. PMID:27384239

  19. Secure Scientific Applications Scheduling Technique for Cloud Computing Environment Using Global League Championship Algorithm.

    Science.gov (United States)

    Abdulhamid, Shafi'i Muhammad; Abd Latiff, Muhammad Shafie; Abdul-Salaam, Gaddafi; Hussain Madni, Syed Hamid

    2016-01-01

    Cloud computing system is a huge cluster of interconnected servers residing in a datacenter and dynamically provisioned to clients on-demand via a front-end interface. Scientific applications scheduling in the cloud computing environment is identified as NP-hard problem due to the dynamic nature of heterogeneous resources. Recently, a number of metaheuristics optimization schemes have been applied to address the challenges of applications scheduling in the cloud system, without much emphasis on the issue of secure global scheduling. In this paper, scientific applications scheduling techniques using the Global League Championship Algorithm (GBLCA) optimization technique is first presented for global task scheduling in the cloud environment. The experiment is carried out using CloudSim simulator. The experimental results show that, the proposed GBLCA technique produced remarkable performance improvement rate on the makespan that ranges between 14.44% to 46.41%. It also shows significant reduction in the time taken to securely schedule applications as parametrically measured in terms of the response time. In view of the experimental results, the proposed technique provides better-quality scheduling solution that is suitable for scientific applications task execution in the Cloud Computing environment than the MinMin, MaxMin, Genetic Algorithm (GA) and Ant Colony Optimization (ACO) scheduling techniques.

  20. Optimal Residential Load Scheduling Under Utility and Rooftop Photovoltaic Units

    Directory of Open Access Journals (Sweden)

    Ghulam Hafeez

    2018-03-01

    Full Text Available With the rapid advancement in technology, electrical energy consumption is increasing rapidly. Especially, in the residential sector, more than 80% of electrical energy is being consumed because of consumer negligence. This brings the challenging task of maintaining the balance between the demand and supply of electric power. In this paper, we focus on the problem of load balancing via load scheduling under utility and rooftop photovoltaic (PV units to reduce electricity cost and peak to average ratio (PAR in demand-side management. For this purpose, we adopted genetic algorithm (GA, binary particle swarm optimization (BPSO, wind-driven optimization (WDO, and our proposed genetic WDO (GWDO algorithm, which is a hybrid of GA and WDO, to schedule the household load. For energy cost estimation, combined real-time pricing (RTP and inclined block rate (IBR were used. The proposed algorithm shifts load from peak consumption hours to off-peak hours based on combined pricing scheme and generation from rooftop PV units. Simulation results validate our proposed GWDO algorithm in terms of electricity cost and PAR reduction while considering all three scenarios which we have considered in this work: (1 load scheduling without renewable energy sources (RESs and energy storage system (ESS, (2 load scheduling with RESs, and (3 load scheduling with RESs and ESS. Furthermore, our proposed scheme reduced electricity cost and PAR by 22.5% and 29.1% in scenario 1, 47.7% and 30% in scenario 2, and 49.2% and 35.4% in scenario 3, respectively, as compared to unscheduled electricity consumption.

  1. Fair packet scheduling in Wireless Mesh Networks

    KAUST Repository

    Nawab, Faisal

    2014-02-01

    In this paper we study the interactions of TCP and IEEE 802.11 MAC in Wireless Mesh Networks (WMNs). We use a Markov chain to capture the behavior of TCP sessions, particularly the impact on network throughput due to the effect of queue utilization and packet relaying. A closed form solution is derived to numerically determine the throughput. Based on the developed model, we propose a distributed MAC protocol called Timestamp-ordered MAC (TMAC), aiming to alleviate the unfairness problem in WMNs. TMAC extends CSMA/CA by scheduling data packets based on their age. Prior to transmitting a data packet, a transmitter broadcasts a request control message appended with a timestamp to a selected list of neighbors. It can proceed with the transmission only if it receives a sufficient number of grant control messages from these neighbors. A grant message indicates that the associated data packet has the lowest timestamp of all the packets pending transmission at the local transmit queue. We demonstrate that a loose ordering of timestamps among neighboring nodes is sufficient for enforcing local fairness, subsequently leading to flow rate fairness in a multi-hop WMN. We show that TMAC can be implemented using the control frames in IEEE 802.11, and thus can be easily integrated in existing 802.11-based WMNs. Our simulation results show that TMAC achieves excellent resource allocation fairness while maintaining over 90% of maximum link capacity across a large number of topologies.

  2. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  3. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  4. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  5. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  6. Scheduling multimedia services in cloud computing environment

    Science.gov (United States)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  7. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  8. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  9. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  10. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  11. Inter-terminal transfer between port terminals. A continuous mathematical programming model to optimize scheduling and deployment of transport units

    Energy Technology Data Exchange (ETDEWEB)

    Morales Fusco, P.; Pedrielli, G.; Zhou, C.; Hay Lee, L.; Peng Chew, E.

    2016-07-01

    In most large port cities, the challenge of inter-terminal transfers (ITT) prevails due to the long distance between multiple terminals. The quantity of containers requiring movement between terminals as they connect from pre-carrier to on-carrier is increasing with the formation of the mega-alliances. The paper proposes a continuous time mathematical programming model to optimize the deployment and schedule of trucks and barges to minimize the number of operating transporters, their makespan, costs and the distance travelled by the containers by choosing the right combination of transporters and container movements while fulfilling time window restrictions imposed on reception of the containers. A multi-step routing problem is developed where transporters can travel from one terminal to another and/or load or unload containers from a specific batch at each step. The model proves successful in identifying the costless schedule and means of transportation. And a sensibility analysis over the parameters used is provided. (Author)

  12. 5 CFR 532.267 - Special wage schedules for aircraft, electronic, and optical instrument overhaul and repair...

    Science.gov (United States)

    2010-01-01

    ... manufacturing. 334418 Printed circuit assembly (electronic assembly) manufacturing. 334419 Other electronic..., electronic, and optical instrument overhaul and repair positions in Puerto Rico. 532.267 Section 532.267 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PREVAILING RATE SYSTEMS...

  13. Bridging the Gap Between Planning and Scheduling

    Science.gov (United States)

    Smith, David E.; Frank, Jeremy; Jonsson, Ari K.; Norvig, Peter (Technical Monitor)

    2000-01-01

    Planning research in Artificial Intelligence (AI) has often focused on problems where there are cascading levels of action choice and complex interactions between actions. In contrast. Scheduling research has focused on much larger problems where there is little action choice, but the resulting ordering problem is hard. In this paper, we give an overview of M planning and scheduling techniques, focusing on their similarities, differences, and limitations. We also argue that many difficult practical problems lie somewhere between planning and scheduling, and that neither area has the right set of tools for solving these vexing problems.

  14. When politics prevails

    DEFF Research Database (Denmark)

    Jensen, Mads Dagnis; Snaith, Holly

    2016-01-01

    This article analyses Britain’s quest to negotiate its future membership of the European Union (EU) through the lens of Liberal intergovernmentalism. The article demonstrates that despite the significant economic consequences of a potential Brexit, party political factors have hitherto proven more...

  15. Can Cooler Heads Prevail?

    Science.gov (United States)

    Rice, A. R.

    2015-12-01

    The significant correlation between dropping temperatures throughout the Pliocene and the concomitant explosive expansion of the Hominid brain has led a number of workers to postulate climate change drove human evolution. Our brain (that of Homo sapiens), comprises 1-2 percent of our body weight but consumes 20 -25 percent of the body's caloric intake. We are "hotheads". Brains are extremely sensitive to overheating but we are endowed with unparalleled thermal regulation, much of it given over to protecting the Central Nervous System (CNS). Will there be reversed trends with global warming? The human brain has been shrinking since the end of the Ice Ages, losing about 150cc over the past 10,000 years. Polar bear skulls have been downsizing as well. Almost all mass extinctions or evolutionary upheavals are attributed to global warming: e.g. the Permian/Triassic (P/T) event, i.e., "The Great Dying", 250 million years ago (~90% of all life forms wiped out); the Paleocene/ Eocene Thermal Maximum (PETM) 55 million years ago. They may be analogs for what might await us. Large creatures, whose body size inhibits cooling, melted away during the PETM. Horses, initially the size of dogs then, reduced to the size of cats. An unanticipated hazard for humans that may attend extreme global warming is dumbing down or needing to retreat to the Poles as did those creatures that survived the P/T event (some references: http://johnhawks.net/research/hawks-2011-brain-size-selection-holocene; Kandel, E. et al Principles of Neural Science 4th ed. New York (US): McGraw-Hill, 2000; Selective Brain Cooling in Early Hominids:phylogenetic and evolutionary implications, Reeser, H., reeser@flmnh.ufl.edu; How the body controls brain temperature; the temperature shielding effect of cerebral blood flow, Mingming Z. et al. J Appl Physiol. 2006 November; 101(5): 1481-1488; news.nationalgeographic.com/ news/2014/03/140327-climate-change-shrinks-salamanders-global-warming-science/; Heat illness and heat stroke, www.ozemedicine.com/wiki/doku.php?id=heat illness 7/3/2010)

  16. Where the signs prevail

    Directory of Open Access Journals (Sweden)

    Dardo Scavino

    2016-03-01

    Full Text Available We propose to show in our paper that through his semiotic theory, Barthes developed a theory of subjectivity and society continued with the anti-utilitarian tradition of the Collège de Sociologie where George Bataille, Carl Einstein or Michel Leiris had favored the mythical and ritual dimension of collective life.

  17. Impact of time of initiation of once-monthly paliperidone palmitate in hospitalized Asian patients with acute exacerbation of schizophrenia: a post hoc analysis from the PREVAIL study.

    Science.gov (United States)

    Li, Huafang; Li, Yan; Feng, Yu; Zhuo, Jianmin; Turkoz, Ibrahim; Mathews, Maju; Tan, Wilson

    2018-01-01

    To evaluate the differences in efficacy and safety outcomes in acute exacerbating schizophrenia patients between 2 subgroups (≤1 week and >1 week), differing in time interval from hospitalization to time of initiation of once-monthly paliperidone palmitate. PREVAIL was a multicenter, single-arm, open-label, prospective Phase IV study in hospitalized Asian patients (either sex, aged 18-65 years) diagnosed with schizophrenia ( Diagnostic and Statistical Manual of Mental Disorders , Fourth Edition). Change from baseline to week 13 in primary (Positive and Negative Syndrome Scale [PANSS] total score), secondary endpoints (PANSS responder rate, PANSS subscale, PANSS Marder factor, Clinical Global Impression-Severity, and Personal and Social Performance scale scores, readiness for hospital discharge questionnaire) and safety were assessed in this post hoc analysis. Significant mean reduction from baseline to week 13 in the PANSS total score, 30% PANSS responder rates ( P ≤0.01), PANSS subscales (positive and general psychopathology; all P ≤0.01), PANSS Marder factor (positive symptoms, uncontrolled hostility, and excitement and anxiety/depression; all P ≤0.01), Personal and Social Performance scale scores ( P ≤0.05) and Clinical Global Impression-Severity categorical summary ( P ≤0.05) were significantly greater in the ≤1 week subgroup versus >1 week subgroup ( P ≤0.05). The readiness for hospital discharge questionnaire improved over time for the overall study population, but remained similar between subgroups at all-time points. Treatment-emergent adverse events were similar between the subgroups. Early initiation of once-monthly paliperidone palmitate in hospitalized patients with acute exacerbation of schizophrenia led to greater improvements in psychotic symptoms with comparable safety than treatment initiation following 1 week of hospitalization.

  18. Performance of Downlink Frequency Domain Packet Scheduling for the UTRAN Long Term Evolution

    DEFF Research Database (Denmark)

    Pokhariyal, Akhilesh; Kolding, Troels E.; Mogensen, Preben

    2006-01-01

    -blind, but time-opportunistic scheduling, FDPS shows gain in both average system capacity and cell-edge data rates on the order of 40%. However, FDPS performance is shown to depend significantly on the frequency-domain scheduling resolution as well as the accuracy of the channel state reports. Assuming Typical...... Urban channel profile, studies show that the scheduling resolution should preferably be as low as 375 kHz to yield significant FDPS gain and the std. of the error of radio state reports need to be kept within 1.5-2 dB....

  19. Individual differences in strategic flight management and scheduling

    Science.gov (United States)

    Wickens, Christopher D.; Raby, Mireille

    1991-01-01

    A group of 30 instrument-rated pilots was made to fly simulator approaches to three airports under conditions of low, medium, and high workload conditions. An analysis is presently conducted of the difference in discrete task scheduling between the group of 10 highest and 10 lowest performing pilots in the sample; this categorization was based on the mean of various flight-profile measures. The two groups were found to differ from each other only in terms of the time when specific events were conducted, and of the optimality of scheduling for certain high-priority tasks. These results are assessed in view of the relative independence of task-management skills from aircraft-control skills.

  20. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  1. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  2. Quantify Risk to Manage Cost and Schedule

    National Research Council Canada - National Science Library

    Raymond, Fred

    1999-01-01

    Too many projects suffer from unachievable budget and schedule goals, caused by unrealistic estimates and the failure to quantify and communicate the uncertainty of these estimates to managers and sponsoring executives...

  3. Alternative Work Schedules Increase Employee Satisfaction.

    Science.gov (United States)

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  4. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  5. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    . In this paper, we propose a novel nonblocking scheduling mechanism that is used prior to the actual service invocations. Its aim is to reach an agreement between the client and all participating providers on what transaction processing times have to be expected, accepted, and guaranteed. This enables service......For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...... schedulers of service providers typically do take into account neither time constraints for committing the whole transaction, nor the individual services' constraints when scheduling decisions are made. This often leads to an unnecessary blocking of transactions by (possibly long-running) others...

  6. Schedule Sales Query Report Generation System

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  7. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  8. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  9. Congruent Validity of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Harris, Thomas L.; Brown, Nina W.

    1979-01-01

    The validity of the Rathus Assertiveness Schedule (RAS) was investigated by correlating it with the six Class I scales of the California Psychological Inventory on a sample of undergraduate students. Results supported the validity of the RAS. (JKS)

  10. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  11. Job shop scheduling by local search

    NARCIS (Netherlands)

    Aarts, E.H.L.; Lenstra, J.K.; Laarhoven, van P.J.M.; Ulder, N.L.J.

    1992-01-01

    We present a computational performance analysis of local search algorithms for job shop scheduling. The algorithms under investigation are iterative improvement, simulated annealing, threshold accepting and genetic local search. Our study shows that simulated annealing performs best in the sense

  12. Scheduling job shop - A case study

    Science.gov (United States)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  13. Job scheduling in a heterogenous grid environment

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  14. The School Schedule--Servant or Mistress?

    Science.gov (United States)

    Holmes, Mark

    1984-01-01

    Pointing out that time is a dimension of school wealth, the author explores its use in school schedules. Administrators need to be aware of the relationship between time allocation and learning consequences. (MD)

  15. Economic and psychological burden of scheduled surgery ...

    African Journals Online (AJOL)

    Background: Cancellation of scheduled surgery creates a financial burden for hospitals, caregivers and ..... costs and disregard some of the aspects mentioned in the ..... cancellation of elective surgical procedures in a Spanish general.

  16. Onboard Autonomous Scheduling Intelligence System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Scheduling the daily activities of the crew on a human space mission is currently a cumbersome job performed by a large team of operations experts on the ground....

  17. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  18. Courts, Scheduled Damages, and Medical Malpractice Insurance

    DEFF Research Database (Denmark)

    Bertoli, Paola; Grembi, Veronica

    We assess the impact of the introduction of schedules of non-economic damages (i.e. tiered caps systems) on the behavior of insurers operating in the medical liability market for hospitals while controlling the performance of the judicial system, measured as court backlog. Using a difference......-in-differences strategy on Italian data, we find that the introduction of schedules increases the presence of insurers (i.e. medical liability market attractiveness) only in inefficient judicial districts. In the same way, court inefficiency is attractive to insurers for average values of schedules penetration...... of the market, with an increasing positive impact of inefficiency as the territorial coverage of schedules increases. Finally, no significant impact is registered on paid premiums. Our analysis sheds light on a complex set of elements affecting the decisions of insurers in malpractice markets. The analysis...

  19. 76 FR 18262 - January 2011 Pay Schedules

    Science.gov (United States)

    2011-04-01

    ... an OPM memorandum, CPM 2009-27. (See http://www.opm.gov/oca/compmemo/index.asp .) Executive Order... Schedule ($165,300 in 2011, the same level as in 2010). On December 27, 2010, OPM issued a memorandum (CPM...

  20. Skeletal-related events significantly impact health-related quality of life in metastatic castration-resistant prostate cancer: data from PREVAIL and AFFIRM trials.

    Science.gov (United States)

    Saad, F; Ivanescu, C; Phung, D; Loriot, Y; Abhyankar, S; Beer, T M; Tombal, B; Holmstrom, S

    2017-03-01

    We investigated the impact of skeletal-related events (SREs) on health-related quality of life (HRQoL) in patients with metastatic castration-resistant prostate cancer (mCRPC) in phase III trials of enzalutamide versus placebo. Patients with mCRPC experiencing at least one SRE during AFFIRM and PREVAIL were assessed for trajectory-adjusted mean change in HRQoL by first SRE using Functional Assessment of Cancer Therapy-Prostate (FACT-P; AFFIRM, three domains, and PREVAIL, nine domains) and EQ-5D (PREVAIL) instruments. First SREs caused HRQoL deterioration in both trials. Spinal cord compression had the largest impact, with clinically meaningful reductions in seven of nine FACT-P domains in PREVAIL and all three in AFFIRM (mean (95% confidence interval (CI)) change in FACT-P total score -16.95 (-26.47, -7.44) and -9.69 (-16.10, -3.27), respectively). In PREVAIL, first SREs caused clinically meaningful declines in EQ-5D utility index, irrespective of category; spinal cord compression had the largest impact (mean (95% CI) change -0.24 (-0.39, -0.08)). In AFFIRM, FACT-P and FACT-General total scores showed clinically meaningful declines after radiation/surgery to bone. SREs were associated with clinically meaningful functional declines in the daily lives of patients with mCRPC. Spinal cord compression had the largest impact on HRQoL.

  1. Heuristic Approach for Balancing Shift Schedules

    International Nuclear Information System (INIS)

    Kim, Dae Ho; Yun, Young Su; Lee, Yong Hee

    2005-01-01

    In this paper, a heuristic approach for balancing shift schedules is proposed. For the shift schedules, various constraints which have usually been considered in realworld industry are used, and the objective is to minimize the differences of the workloads in each workgroup. The constraints and objective function are implemented in the proposed heuristic approach. Using a simple instance, the efficiency of the proposed heuristic approach is proved

  2. Algorithms for classical and modern scheduling problems

    OpenAIRE

    Ott, Sebastian

    2016-01-01

    Subject of this thesis is the design and the analysis of algorithms for scheduling problems. In the first part, we focus on energy-efficient scheduling, where one seeks to minimize the energy needed for processing certain jobs via dynamic adjustments of the processing speed (speed scaling). We consider variations and extensions of the standard model introduced by Yao, Demers, and Shenker in 1995 [79], including the addition of a sleep state, the avoidance of preemption, and variable speed lim...

  3. Maritime wideband communication networks video transmission scheduling

    CERN Document Server

    Yang, Tingting

    2014-01-01

    This Springer Brief covers emerging maritime wideband communication networks and how they facilitate applications such as maritime distress, urgency, safety and general communications. It provides valuable insight on the data transmission scheduling and protocol design for the maritime wideband network. This brief begins with an introduction to maritime wideband communication networks including the architecture, framework, operations and a comprehensive survey on current developments. The second part of the brief presents the resource allocation and scheduling for video packet transmission wit

  4. Lift scheduling organization : Lift Concept for Lemminkainen

    OpenAIRE

    Mingalimov, Iurii

    2015-01-01

    The purpose of the work was to make a simple schedule for the main contractors and clients to check and control workflow connected with lifts. It gathers works with electricity, construction, engineering networks, installing equipment and commissioning works. The schedule was carried out during working on the building site Aino in Saint Petersburg in Lemminkӓinen. The duration of work was 5 months. The lift concept in Lemminkӓinen is very well controlled in comparison with other buil...

  5. Revised data taking schedule with ion beams

    CERN Document Server

    Gazdzicki, Marek; Aduszkiewicz, A; Andrieu, B; Anticic, T; Antoniou, N; Argyriades, J; Asryan, A G; Baatar, B; Blondel, A; Blumer, J; Boldizsar, L; Bravar, A; Brzychczyk, J; Bubak, A; Bunyatov, S A; Choi, K U; Christakoglou, P; Chung, P; Cleymans, J; Derkach, D A; Diakonos, F; Dominik, W; Dumarchez, J; Engel, R; Ereditato, A; Feofilov, G A; Fodor, Z; Ferrero, A; Gazdzicki, M; Golubeva, M; Grebieszkow, K; Grzeszczuk, A; Guber, F; Hasegawa, T; Haungs, A; Igolkin, S; Ivanov, A S; Ivashkin, A; Kadija, K; Katrynska, N; Kielczewska, D; Kikola, D; Kisiel, J; Kobayashi, T; Kolesnikov, V I; Kolev, D; Kolevatov, R S; Kondratiev, V P; Kowalski, S; Kurepin, A; Lacey, R; Laszlo, A; Lyubushkin, V V; Majka, Z; I Malakhov, A; Marchionni, A; Marcinek, A; Maris, I; Matveev, V; Melkumov, G L; Meregaglia, A; Messina, M; Mijakowski, P; Mitrovski, M; Montaruli, T; Mrówczynski, St; Murphy, S; Nakadaira, T; Naumenko, P A; Nikolic, V; Nishikawa, K; Palczewski, T; Pálla, G; Panagiotou, A D; Peryt, W; Planeta, R; Pluta, J; Popov, B A; Posiadala, M; Przewlocki, P; Rauch, W; Ravonel, M; Renfordt, R; Röhrich, D; Rondio, E; Rossi, B; Roth, M; Rubbia, A; Rybczynski, M; Sadovskii, A; Sakashita, K; Schuster, T; Sekiguchi, T; Seyboth, P; Shibata, M; Sissakian, A N; Skrzypczak, E; Slodkowski, M; Sorin, A S; Staszel, P; Stefanek, G; Stepaniak, J; Strabel, C; Ströbele, H; Susa, T; Szentpétery, I; Szuba, M; Tada, M; Taranenko, A; Tsenov, R; Ulrich, R; Unger, M; Vassiliou, M; Vechernin, V V; Vesztergombi, G; Wlodarczyk, Z; Wojtaszek, A; Zipper, W; CERN. Geneva. SPS and PS Experiments Committee; SPSC

    2009-01-01

    This document presents the revised data taking schedule of NA61 with ion beams. The revision takes into account limitations due to the new LHC schedule as well as final results concerning the physics performance with secondary ion beams. It is proposed to take data with primary Ar and Xe beams in 2012 and 2014, respectively, and to test and use for physics a secondary B beam from primary Pb beam fragmentation in 2010, 2011 and 2013.

  6. Job schedul in Grid batch farms

    International Nuclear Information System (INIS)

    Gellrich, Andreas

    2014-01-01

    We present here a study for a scheduler which cooperates with the queueing system TORQUE and is tailored to the needs of a HEP-dominated large Grid site with around 10000 jobs slots. Triggered by severe scaling problems of MAUI, a scheduler, referred to as MYSCHED, was developed and put into operation. We discuss conceptional aspects as well as experiences after almost two years of running.

  7. 20 CFR 655.120 - Offered wage rate.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Offered wage rate. 655.120 Section 655.120... the United States (H-2A Workers) Prefiling Procedures § 655.120 Offered wage rate. (a) To comply with... wage that is the highest of the AEWR, the prevailing hourly wage or piece rate, the agreed-upon...

  8. 12 CFR 619.9170 - Fixed interest rate.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Fixed interest rate. 619.9170 Section 619.9170 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM DEFINITIONS § 619.9170 Fixed interest rate. The rate of interest specified in the note or loan document which will prevail as the maximum...

  9. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  10. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  11. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  12. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  13. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  14. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  15. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  16. Activating KIR molecules and their cognate ligands prevail in children with a diagnosis of ASD and in their mothers.

    Science.gov (United States)

    Guerini, Franca R; Bolognesi, Elisabetta; Chiappedi, Matteo; Manca, Salvatorica; Ghezzo, Alessandro; Agliardi, Cristina; Zanette, Michela; Littera, Roberto; Carcassi, Carlo; Sotgiu, Stefano; Clerici, Mario

    2014-02-01

    The activity of natural killer (NK) cells is modulated by the interaction between killer-cell immune globulin-like receptor (KIR) proteins and their cognate HLA ligands; activated NK cells produce inflammatory cytokines and mediate innate immune responses. Activating KIR/HLA complexes (aKIR/HLA) were recently suggested to prevail in children with autism spectrum disorders (ASD), a neurodevelopmental syndrome characterized by brain and behavioral abnormalities and associated with a degree of inflammation. We verified whether such findings could be confirmed by analyzing two sample cohorts of Sardinian and continental Italian ASD children and their mothers. Results showed that aKIR/HLA are increased whereas inhibitory KIR/HLA complexes are reduced in ASD children; notably this skewing was even more significant in their mothers. KIR and HLA molecules are expressed by placental cells and by the trophoblast and their interactions result in immune activation and influence fetal, as well as central nervous system development and plasticity. Data herein suggest that in utero KIR/HLA immune interactions favor immune activation in ASD; this may play a role in the pathogenesis of the disease. Copyright © 2013 Elsevier Inc. All rights reserved.

  17. Will the New Gnosticism prevail? Remarks on Synthetic Biology, Nanotechnologies and Genetic Manipulation facing the Century of the Big Challenge

    Directory of Open Access Journals (Sweden)

    Jorge Riechmann

    2016-12-01

    Full Text Available Technological utopianism seduces many people, from the very origins of Western modernity –remember Francis Bacon’s island of Bensalem in his New Atlantis–, with the temptation of complete mastery over nature (which includes human immortality. Today, the prevailing mentality in the West, which tends to become a universal worldview, has much in common with the beliefs of the ancient Gnostics. According to this mindset, science and technology can allow the human mind to escape the limitations that characterize its natural state, releasing the anchor to biological stuff and escaping the human condition. In short, we would become gods –gods thought of as Immortal Super-Engineers. We must resist these destructive illusions and delusions, which means: technical rationality has to make his own critique of utopian reason (in the sense of Franz Hinkelammert. Without this self-criticism, a judicious use of techniques and technologies will be out of reach –and they do have an enormous potential for improving the human condition–, while avoiding –if it were still possible– the exterminist, nihilistic and suicidal drift of industrial civilization.

  18. Prospective randomized evaluation of the watchman left atrial appendage closure device in patients with atrial fibrillation versus long-term warfarin therapy: The PREVAIL trial.

    Science.gov (United States)

    Belgaid, Djouhar Roufeida; Khan, Zara; Zaidi, Mariam; Hobbs, Adrian

    2016-09-15

    Assessing the safety and effectiveness of left atrial appendage (LAA) (pouch found in the upper chambers of the heart) occlusion, using the Watchman device compared to long term warfarin therapy (drug that reduces clot formation), in preventing the risk of stroke in patients with atrial fibrillation (most common type of irregular heart beat). 90% of strokes in atrial fibrillation arise from clots forming in this pouch. By mechanically blocking it using the device less clots are suggested to be formed. This is an alternative to taking warfarin especially in patients who cannot take it. 50 sites in the United States enrolled 407 participants. After being randomly allocated, the device group had 269 participants and warfarin group (comparator)had 138 participants. Patients with atrial fibrillation and at high risk of stroke were randomly allocated a group after they were deemed eligible. Patients in the device group had to take warfarin and aspirin for 45days till the complete closure of the LAA. The oral anticoagulant was followed by dual antiplatelet therapy until 6months and then ASA. Patients in the warfarin group have to take it for life and were continually monitored. The study ran for 26months. The trial assessed the rate of adverse events using three endpoints: The PREVAIL trial was not designed to show superiority, but non-inferiority. It met the safety endpoint and one efficacy endpoint for the watchman device compared to long term warfarin for overall efficacy of the device. The results established that LAA occlusion is not worse than warfarin intake for the prevention of stroke more than 1week after randomization. Compared to previous trials, the safety of the device has also improved. LAA occlusion is a reasonable alternative to chronic warfarin therapy in stroke prevention for patients with atrial fibrillation. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  19. Optimal residential smart appliances scheduling considering distribution network constraints

    Directory of Open Access Journals (Sweden)

    Yu-Ree Kim

    2016-01-01

    Full Text Available As smart appliances (SAs are more widely adopted within distribution networks, residential consumers can contribute to electricity market operations with demand response resources and reduce their electricity bill. However, if the schedules of demand response resources are determined only by the economic electricity rate signal, the schedule can be unfeasible due to the distribution network constraints. Furthermore, it is impossible for consumers to understand the complex physical characteristics and reflect them in their everyday behaviors. This paper introduces the concept of load coordinating retailer (LCR that deals with demand responsive appliances to reduce electrical consumption for the given distribution network constraints. The LCR can play the role of both conventional retailer and aggregated demand response provider for residential customers. It determines the optimal schedules for the aggregated neighboring SAs according to their types within each distribution feeder. The optimization algorithms are developed using Mixed Integer Linear Programming, and the distribution network is solved by the Newton–Raphson AC power flow.

  20. Entity’s Irregular Demand Scheduling of the Wholesale Electricity Market based on the Forecast of Hourly Price Ratios

    Directory of Open Access Journals (Sweden)

    O. V. Russkov

    2015-01-01

    Full Text Available The article considers a hot issue to forecast electric power demand amounts and prices for the entities of wholesale electricity market (WEM, which are in capacity of a large user with production technology requirements prevailing over hourly energy planning ones. An electric power demand of such entities is on irregular schedule. The article analyses mathematical models, currently applied to forecast demand amounts and prices. It describes limits of time-series models and fundamental ones in case of hourly forecasting an irregular demand schedule of the electricity market entity. The features of electricity trading at WEM are carefully analysed. Factors that influence on irregularity of demand schedule of the metallurgical plant are shown. The article proposes method for the qualitative forecast of market price ratios as a tool to reduce a dependence on the accuracy of forecasting an irregular schedule of demand. It describes the differences between the offered method and the similar ones considered in research studies and scholarly works. The correlation between price ratios and relaxation in the requirements for the forecast accuracy of the electric power consumption is analysed. The efficiency function of forecast method is derived. The article puts an increased focus on description of the mathematical model based on the method of qualitative forecast. It shows main model parameters and restrictions the electricity market imposes on them. The model prototype is described as a programme module. Methods to assess an effectiveness of the proposed forecast model are examined. The positive test results of the model using JSC «Volzhsky Pipe Plant» data are given. A conclusion is drawn concerning the possibility to decrease dependence on the forecast accuracy of irregular schedule of entity’s demand at WEM. The effective trading tool has been found for the entities of irregular demand schedule at WEM. The tool application allows minimizing cost