WorldWideScience

Sample records for schedule maximal dose

  1. Maximizing System Lifetime by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.; Bohnenkamp, H.C.; Katoen, Joost P.

    2009-01-01

    The use of mobile devices is limited by the battery lifetime. Some devices have the option to connect an extra battery, or to use smart battery-packs with multiple cells to extend the lifetime. In these cases, scheduling the batteries over the load to exploit recovery properties usually extends the

  2. Throughput maximization of parcel sorter systems by scheduling inbound containers

    NARCIS (Netherlands)

    Haneyah, S.W.A.; Schutten, Johannes M.J.; Fikse, K.; Clausen, Uwe; ten Hompel, Michael; Meier, J. Fabian

    2013-01-01

    This paper addresses the inbound container scheduling problem for automated sorter systems in express parcel sorting. The purpose is to analyze which container scheduling approaches maximize the throughput of sorter systems. We build on existing literature, particularly on the dynamic load balancing

  3. Energy-driven scheduling algorithm for nanosatellite energy harvesting maximization

    Science.gov (United States)

    Slongo, L. K.; Martínez, S. V.; Eiterer, B. V. B.; Pereira, T. G.; Bezerra, E. A.; Paiva, K. V.

    2018-06-01

    The number of tasks that a satellite may execute in orbit is strongly related to the amount of energy its Electrical Power System (EPS) is able to harvest and to store. The manner the stored energy is distributed within the satellite has also a great impact on the CubeSat's overall efficiency. Most CubeSat's EPS do not prioritize energy constraints in their formulation. Unlike that, this work proposes an innovative energy-driven scheduling algorithm based on energy harvesting maximization policy. The energy harvesting circuit is mathematically modeled and the solar panel I-V curves are presented for different temperature and irradiance levels. Considering the models and simulations, the scheduling algorithm is designed to keep solar panels working close to their maximum power point by triggering tasks in the appropriate form. Tasks execution affects battery voltage, which is coupled to the solar panels through a protection circuit. A software based Perturb and Observe strategy allows defining the tasks to be triggered. The scheduling algorithm is tested in FloripaSat, which is an 1U CubeSat. A test apparatus is proposed to emulate solar irradiance variation, considering the satellite movement around the Earth. Tests have been conducted to show that the scheduling algorithm improves the CubeSat energy harvesting capability by 4.48% in a three orbit experiment and up to 8.46% in a single orbit cycle in comparison with the CubeSat operating without the scheduling algorithm.

  4. Maternal methadone dosing schedule and fetal neurobehavior

    Science.gov (United States)

    Jansson, Lauren M.; DiPietro, Janet A.; Velez, Martha; Elko, Andrea; Knauer, Heather; Kivlighan, Katie T.

    2008-01-01

    Objective Daily methadone maintenance is the standard of care for opiate dependency during pregnancy. Previous research has indicated that single-dose maternal methadone administration significantly suppresses fetal neurobehaviors. The purpose of this study was to determine if split-dosing would have less impact on fetal neurobehavior than single-dose administration. Methods Forty methadone-maintained women were evaluated at peak and trough maternal methadone levels on single- and split-dosing schedules. Monitoring sessions occurred at 36 and 37 weeks gestation in a counterbalanced study design. Fetal measures included heart rate, variability, accelerations, motor activity and fetal movement-heart rate coupling (FM-FHR). Maternal measures included heart period, variability, skin conductance, respiration and vagal tone. Repeated measure analysis of variance was used to evaluate within-subject changes between split- and single-dosing regimens. Results All fetal neurobehavioral parameters were suppressed by maternal methadone administration, regardless of dosing regimen. Fetal parameters at peak were significantly lower during single vs. split methadone administration. FM-FHR coupling was less suppressed from trough to peak during split-dosing vs. single-dosing. Maternal physiologic parameters were generally unaffected by dosing condition. Conclusion Split- dosed fetuses displayed less neurobehavioral suppression from trough to peak maternal methadone levels as compared to single-dosed fetuses. Split-dosing may be beneficial for methadone-maintained pregnant women. PMID:19085624

  5. Partitioning and Scheduling DSP Applications with Maximal Memory Access Hiding

    Directory of Open Access Journals (Sweden)

    Sha Edwin Hsing-Mean

    2002-01-01

    Full Text Available This paper presents an iteration space partitioning scheme to reduce the CPU idle time due to the long memory access latency. We take into consideration both the data accesses of intermediate and initial data. An algorithm is proposed to find the largest overlap for initial data to reduce the entire memory traffic. In order to efficiently hide the memory latency, another algorithm is developed to balance the ALU and memory schedules. The experiments on DSP benchmarks show that the algorithms significantly outperform the known existing methods.

  6. On-line scheduling on a single machine : maximizing the number of early jobs

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Potts, C.N.; Woeginger, G.J.

    2000-01-01

    This note deals with the scheduling problem of maximizing the number of early jobs on a single machine. We investigate the on-line version of this problem in the Preemption-Restart model. This means that jobs may be preempted, but preempting results in all the work done on this job so far being

  7. Modeling the violation of reward maximization and invariance in reinforcement schedules.

    Directory of Open Access Journals (Sweden)

    Giancarlo La Camera

    2008-08-01

    Full Text Available It is often assumed that animals and people adjust their behavior to maximize reward acquisition. In visually cued reinforcement schedules, monkeys make errors in trials that are not immediately rewarded, despite having to repeat error trials. Here we show that error rates are typically smaller in trials equally distant from reward but belonging to longer schedules (referred to as "schedule length effect". This violates the principles of reward maximization and invariance and cannot be predicted by the standard methods of Reinforcement Learning, such as the method of temporal differences. We develop a heuristic model that accounts for all of the properties of the behavior in the reinforcement schedule task but whose predictions are not different from those of the standard temporal difference model in choice tasks. In the modification of temporal difference learning introduced here, the effect of schedule length emerges spontaneously from the sensitivity to the immediately preceding trial. We also introduce a policy for general Markov Decision Processes, where the decision made at each node is conditioned on the motivation to perform an instrumental action, and show that the application of our model to the reinforcement schedule task and the choice task are special cases of this general theoretical framework. Within this framework, Reinforcement Learning can approach contextual learning with the mixture of empirical findings and principled assumptions that seem to coexist in the best descriptions of animal behavior. As examples, we discuss two phenomena observed in humans that often derive from the violation of the principle of invariance: "framing," wherein equivalent options are treated differently depending on the context in which they are presented, and the "sunk cost" effect, the greater tendency to continue an endeavor once an investment in money, effort, or time has been made. The schedule length effect might be a manifestation of these

  8. Linezolid Dose That Maximizes Sterilizing Effect While Minimizing Toxicity and Resistance Emergence for Tuberculosis.

    Science.gov (United States)

    Srivastava, Shashikant; Magombedze, Gesham; Koeuth, Thearith; Sherman, Carleton; Pasipanodya, Jotam G; Raj, Prithvi; Wakeland, Edward; Deshpande, Devyani; Gumbo, Tawanda

    2017-08-01

    Linezolid has an excellent sterilizing effect in tuberculosis patients but high adverse event rates. The dose that would maximize efficacy and minimize toxicity is unknown. We performed linezolid dose-effect and dose-scheduling studies in the hollow fiber system model of tuberculosis (HFS-TB) for sterilizing effect. HFS-TB units were treated with several doses to mimic human-like linezolid intrapulmonary pharmacokinetics and repetitively sampled for drug concentration, total bacterial burden, linezolid-resistant subpopulations, and RNA sequencing over 2 months. Linezolid-resistant isolates underwent whole-genome sequencing. The expression of genes encoding efflux pumps in the first 1 to 2 weeks revealed the same exposure-response patterns as the linezolid-resistant subpopulation. Linezolid-resistant isolates from the 2nd month of therapy revealed mutations in several efflux pump/transporter genes and a LuxR-family transcriptional regulator. Linezolid sterilizing effect was linked to the ratio of unbound 0- to 24-h area under the concentration-time curve (AUC 0-24 ) to MIC. Optimal microbial kill was achieved at an AUC 0-24 /MIC ratio of 119. The optimal sterilizing effect dose for clinical use was identified using Monte Carlo simulations. Clinical doses of 300 and 600 mg/day (or double the dose every other day) achieved this target in 87% and >99% of 10,000 patients, respectively. The susceptibility breakpoint identified was 2 mg/liter. The simulations identified that a 300-mg/day dose did not achieve AUC 0-24 s associated with linezolid toxicity, while 600 mg/day achieved those AUC 0-24 s in linezolid dose of 300 mg/day performed well and should be compared to 600 mg/day or 1,200 mg every other day in clinical trials. Copyright © 2017 Srivastava et al.

  9. Maximizing the nurses' preferences in nurse scheduling problem: mathematical modeling and a meta-heuristic algorithm

    Science.gov (United States)

    Jafari, Hamed; Salmasi, Nasser

    2015-09-01

    The nurse scheduling problem (NSP) has received a great amount of attention in recent years. In the NSP, the goal is to assign shifts to the nurses in order to satisfy the hospital's demand during the planning horizon by considering different objective functions. In this research, we focus on maximizing the nurses' preferences for working shifts and weekends off by considering several important factors such as hospital's policies, labor laws, governmental regulations, and the status of nurses at the end of the previous planning horizon in one of the largest hospitals in Iran i.e., Milad Hospital. Due to the shortage of available nurses, at first, the minimum total number of required nurses is determined. Then, a mathematical programming model is proposed to solve the problem optimally. Since the proposed research problem is NP-hard, a meta-heuristic algorithm based on simulated annealing (SA) is applied to heuristically solve the problem in a reasonable time. An initial feasible solution generator and several novel neighborhood structures are applied to enhance performance of the SA algorithm. Inspired from our observations in Milad hospital, random test problems are generated to evaluate the performance of the SA algorithm. The results of computational experiments indicate that the applied SA algorithm provides solutions with average percentage gap of 5.49 % compared to the upper bounds obtained from the mathematical model. Moreover, the applied SA algorithm provides significantly better solutions in a reasonable time than the schedules provided by the head nurses.

  10. Joint Throughput Maximization and Fair Uplink Transmission Scheduling in CDMA Systems

    Directory of Open Access Journals (Sweden)

    Symeon Papavassiliou

    2009-01-01

    Full Text Available We study the fundamental problem of optimal transmission scheduling in a code-division multiple-access wireless system in order to maximize the uplink system throughput, while satisfying the users quality-of-service (QoS requirements and maintaining fairness among them. The corresponding problem is expressed as a weighted throughput maximization problem, under certain power and QoS constraints, where the weights are the control parameters reflecting the fairness constraints. With the introduction of the power index capacity, it is shown that this optimization problem can be converted into a binary knapsack problem, where all the corresponding constraints are replaced by the power index capacities at some certain system power index. A two-step approach is followed to obtain the optimal solution. First, a simple method is proposed to find the optimal set of users to receive service for a given fixed target system load, and then the optimal solution is obtained as a global search within a certain range. Furthermore, a stochastic approximation method is presented to effectively identify the required control parameters. The performance evaluation reveals the advantages of our proposed policy over other existing ones and confirms that it achieves very high throughput while maintains fairness among the users, under different channel conditions and requirements.

  11. Optimal Intermittent Dose Schedules for Chemotherapy Using Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    Nadia ALAM

    2013-08-01

    Full Text Available In this paper, a design method for optimal cancer chemotherapy schedules via genetic algorithm (GA is presented. The design targets the key objective of chemotherapy to minimize the size of cancer tumor after a predefined time with keeping toxic side effects in limit. This is a difficult target to achieve using conventional clinical methods due to poor therapeutic indices of existing anti-cancer drugs. Moreover, there are clinical limitations in treatment administration to maintain continuous treatment. Besides, carefully decided rest periods are recommended to for patient’s comfort. Three intermittent drug scheduling schemes are presented in this paper where GA is used to optimize the dose quantities and timings by satisfying several treatment constraints. All three schemes are found to be effective in total elimination of cancer tumor after an agreed treatment length. The number of cancer cells is found zero at the end of the treatment for all three cases with tolerable toxicity. Finally, two of the schemes, “Fixed interval variable dose (FIVD and “Periodic dose” that are periodic in characteristic have been emphasized due to their additional simplicity in administration along with friendliness to patients. responses to the designed treatment schedules. Therefore the proposed design method is capable of planning effective, simple, patient friendly and acceptable chemotherapy schedules.

  12. Near-Optimal Heuristics for Just-In-Time Jobs Maximization in Flow Shop Scheduling

    Directory of Open Access Journals (Sweden)

    Helio Yochihiro Fuchigami

    2018-04-01

    Full Text Available The number of just-in-time jobs maximization in a permutation flow shop scheduling problem is considered. A mixed integer linear programming model to represent the problem as well as solution approaches based on enumeration and constructive heuristics were proposed and computationally implemented. Instances with up to 10 jobs and five machines are solved by the mathematical model in an acceptable running time (3.3 min on average while the enumeration method consumes, on average, 1.5 s. The 10 constructive heuristics proposed show they are practical especially for large-scale instances (up to 100 jobs and 20 machines, with very good-quality results and efficient running times. The best two heuristics obtain near-optimal solutions, with only 0.6% and 0.8% average relative deviations. They prove to be better than adaptations of the NEH heuristic (well-known for providing very good solutions for makespan minimization in flow shop for the considered problem.

  13. Maximizing Total Profit in Two-agent Problem of Order Acceptance and Scheduling

    Directory of Open Access Journals (Sweden)

    Mohammad Reisi-Nafchi

    2017-03-01

    Full Text Available In competitive markets, attracting potential customers and keeping current customers is a survival condition for each company. So, paying attention to the requests of customers is important and vital. In this paper, the problem of order acceptance and scheduling has been studied, in which two types of customers or agents compete in a single machine environment. The objective is maximizing sum of the total profit of first agent's accepted orders and the total revenue of second agent. Therefore, only the first agent has penalty and its penalty function is lateness and the second agent's orders have a common due date and this agent does not accept any tardy order. To solve the problem, a mathematical programming, a heuristic algorithm and a pseudo-polynomial dynamic programming algorithm are proposed. Computational results confirm the ability of solving all problem instances up to 70 orders size optimally and also 93.12% of problem instances up to 150 orders size by dynamic programming.

  14. Pulsed dose rate and fractionated high dose rate brachytherapy: choice of brachytherapy schedules to replace low dose rate treatments

    International Nuclear Information System (INIS)

    Visser, Andries G.; Aardweg, Gerard J.M.J. van den; Levendag, Peter C.

    1996-01-01

    Purpose: Pulsed dose rate (PDR) brachytherapy is a new type of afterloading brachytherapy (BT) in which a continuous low dose rate (LDR) treatment is simulated by a series of 'pulses,' i.e., fractions of short duration (less than 0.5 h) with intervals between fractions of 1 to a few hours. At the Dr. Daniel den Hoed Cancer Center, the term 'PDR brachytherapy' is used for treatment schedules with a large number of fractions (at least four per day), while the term 'fractionated high dose rate (HDR) brachytherapy' is used for treatment schedules with just one or two brachytherapy fractions per day. Both treatments can be applied as alternatives for LDR BT. This article deals with the choice between PDR and fractionated HDR schedules and proposes possible fractionation schedules. Methods and Materials: To calculate HDR and PDR fractionation schedules with the intention of being equivalent to LDR BT, the linear-quadratic (LQ) model has been used in an incomplete repair formulation as given by Brenner and Hall, and by Thames. In contrast to earlier applications of this model, both the total physical dose and the overall time were not kept identical for LDR and HDR/PDR schedules. A range of possible PDR treatment schedules is presented, both for booster applications (in combination with external radiotherapy (ERT) and for BT applications as a single treatment. Because the knowledge of both α/β values and the half time for repair of sublethal damage (T (1(2)) ), which are required for these calculations, is quite limited, calculations regarding the equivalence of LDR and PDR treatments have been performed for a wide range of values of α/β and T (1(2)) . The results are presented graphically as PDR/LDR dose ratios and as ratios of the PDR/LDR tumor control probabilities. Results: If the condition that total physical dose and overall time of a PDR treatment must be exactly identical to the values for the corresponding LDR treatment regimen is not applied, there appears

  15. Scheduling Algorithms for Maximizing Throughput with Zero-Forcing Beamforming in a MIMO Wireless System

    Science.gov (United States)

    Foronda, Augusto; Ohta, Chikara; Tamaki, Hisashi

    Dirty paper coding (DPC) is a strategy to achieve the region capacity of multiple input multiple output (MIMO) downlink channels and a DPC scheduler is throughput optimal if users are selected according to their queue states and current rates. However, DPC is difficult to implement in practical systems. One solution, zero-forcing beamforming (ZFBF) strategy has been proposed to achieve the same asymptotic sum rate capacity as that of DPC with an exhaustive search over the entire user set. Some suboptimal user group selection schedulers with reduced complexity based on ZFBF strategy (ZFBF-SUS) and proportional fair (PF) scheduling algorithm (PF-ZFBF) have also been proposed to enhance the throughput and fairness among the users, respectively. However, they are not throughput optimal, fairness and throughput decrease if each user queue length is different due to different users channel quality. Therefore, we propose two different scheduling algorithms: a throughput optimal scheduling algorithm (ZFBF-TO) and a reduced complexity scheduling algorithm (ZFBF-RC). Both are based on ZFBF strategy and, at every time slot, the scheduling algorithms have to select some users based on user channel quality, user queue length and orthogonality among users. Moreover, the proposed algorithms have to produce the rate allocation and power allocation for the selected users based on a modified water filling method. We analyze the schedulers complexity and numerical results show that ZFBF-RC provides throughput and fairness improvements compared to the ZFBF-SUS and PF-ZFBF scheduling algorithms.

  16. Dose response of rat retinal microvessels to proton dose schedules used clinically: a pilot study

    International Nuclear Information System (INIS)

    Archambeau, John O.; Mao, Xiao W.; McMillan, Paul J.; Gouloumet, Vanessa L.; Oeinck, Steven C.; Grove, Roger; Yonemoto, Leslie T.; Slater, Jerry D.; Slater, James M.

    2000-01-01

    Purpose: This preclinical rat pilot study quantifies retinal microvessel, endothelial, and pericyte population changes produced by proton irradiation Methods and Materials: The left eyes of rats were irradiated with single doses of 8, 14, 20, and 28 Gy protons; right eyes, with two fractions. Animals were euthanized, and eyes were removed; elastase digests were prepared, and cell populations were counted in sample fields. Results were compared with unirradiated controls. Results: Progressive time- and dose-dependent endothelial cell loss occurred following all schedules. Cell loss was significantly different from control values (p 0 phase of the mitotic cycle. 28 Gy produced photoreceptor cell loss. Conclusion: The retinal digest is an elegant bioassay to quantify the microvessel population response. Single- and split-dose schedules appear to yield similar outcomes, in terms of endothelial cell density

  17. The guinea pig maximization test--with a multiple dose design

    DEFF Research Database (Denmark)

    Andersen, Klaus Ejner; Vølund, A; Frankild, S

    1995-01-01

    The guinea pig maximization test (GPMT) is usually performed with one moderately irritant induction dose of the allergen and gives a qualitative assessment-hazard identification-of the allergenicity of the chemical. We refined the GPMT by applying a multiple dose design and used 30 guinea pigs in...

  18. The guinea pig maximization test--with a multiple dose design

    DEFF Research Database (Denmark)

    Andersen, Klaus Ejner; Vølund, A; Frankild, S

    1995-01-01

    The guinea pig maximization test (GPMT) is usually performed with one moderately irritant induction dose of the allergen and gives a qualitative assessment-hazard identification-of the allergenicity of the chemical. We refined the GPMT by applying a multiple dose design and used 30 guinea pigs...

  19. Maximizing the biological effect of proton dose delivered with scanned beams via inhomogeneous daily dose distributions

    Energy Technology Data Exchange (ETDEWEB)

    Zeng Chuan; Giantsoudi, Drosoula; Grassberger, Clemens; Goldberg, Saveli; Niemierko, Andrzej; Paganetti, Harald; Efstathiou, Jason A.; Trofimov, Alexei [Department of Radiation Oncology, Massachusetts General Hospital and Harvard Medical School, Boston, Massachusetts 02114 (United States)

    2013-05-15

    Purpose: Biological effect of radiation can be enhanced with hypofractionation, localized dose escalation, and, in particle therapy, with optimized distribution of linear energy transfer (LET). The authors describe a method to construct inhomogeneous fractional dose (IFD) distributions, and evaluate the potential gain in the therapeutic effect from their delivery in proton therapy delivered by pencil beam scanning. Methods: For 13 cases of prostate cancer, the authors considered hypofractionated courses of 60 Gy delivered in 20 fractions. (All doses denoted in Gy include the proton's mean relative biological effectiveness (RBE) of 1.1.) Two types of plans were optimized using two opposed lateral beams to deliver a uniform dose of 3 Gy per fraction to the target by scanning: (1) in conventional full-target plans (FTP), each beam irradiated the entire gland, (2) in split-target plans (STP), beams irradiated only the respective proximal hemispheres (prostate split sagittally). Inverse planning yielded intensity maps, in which discrete position control points of the scanned beam (spots) were assigned optimized intensity values. FTP plans preferentially required a higher intensity of spots in the distal part of the target, while STP, by design, employed proximal spots. To evaluate the utility of IFD delivery, IFD plans were generated by rearranging the spot intensities from FTP or STP intensity maps, separately as well as combined using a variety of mixing weights. IFD courses were designed so that, in alternating fractions, one of the hemispheres of the prostate would receive a dose boost and the other receive a lower dose, while the total physical dose from the IFD course was roughly uniform across the prostate. IFD plans were normalized so that the equivalent uniform dose (EUD) of rectum and bladder did not increase, compared to the baseline FTP plan, which irradiated the prostate uniformly in every fraction. An EUD-based model was then applied to estimate tumor

  20. Maximizing the biological effect of proton dose delivered with scanned beams via inhomogeneous daily dose distributions

    International Nuclear Information System (INIS)

    Zeng Chuan; Giantsoudi, Drosoula; Grassberger, Clemens; Goldberg, Saveli; Niemierko, Andrzej; Paganetti, Harald; Efstathiou, Jason A.; Trofimov, Alexei

    2013-01-01

    Purpose: Biological effect of radiation can be enhanced with hypofractionation, localized dose escalation, and, in particle therapy, with optimized distribution of linear energy transfer (LET). The authors describe a method to construct inhomogeneous fractional dose (IFD) distributions, and evaluate the potential gain in the therapeutic effect from their delivery in proton therapy delivered by pencil beam scanning. Methods: For 13 cases of prostate cancer, the authors considered hypofractionated courses of 60 Gy delivered in 20 fractions. (All doses denoted in Gy include the proton's mean relative biological effectiveness (RBE) of 1.1.) Two types of plans were optimized using two opposed lateral beams to deliver a uniform dose of 3 Gy per fraction to the target by scanning: (1) in conventional full-target plans (FTP), each beam irradiated the entire gland, (2) in split-target plans (STP), beams irradiated only the respective proximal hemispheres (prostate split sagittally). Inverse planning yielded intensity maps, in which discrete position control points of the scanned beam (spots) were assigned optimized intensity values. FTP plans preferentially required a higher intensity of spots in the distal part of the target, while STP, by design, employed proximal spots. To evaluate the utility of IFD delivery, IFD plans were generated by rearranging the spot intensities from FTP or STP intensity maps, separately as well as combined using a variety of mixing weights. IFD courses were designed so that, in alternating fractions, one of the hemispheres of the prostate would receive a dose boost and the other receive a lower dose, while the total physical dose from the IFD course was roughly uniform across the prostate. IFD plans were normalized so that the equivalent uniform dose (EUD) of rectum and bladder did not increase, compared to the baseline FTP plan, which irradiated the prostate uniformly in every fraction. An EUD-based model was then applied to estimate tumor

  1. Maximizing the biological effect of proton dose delivered with scanned beams via inhomogeneous daily dose distributions.

    Science.gov (United States)

    Zeng, Chuan; Giantsoudi, Drosoula; Grassberger, Clemens; Goldberg, Saveli; Niemierko, Andrzej; Paganetti, Harald; Efstathiou, Jason A; Trofimov, Alexei

    2013-05-01

    Biological effect of radiation can be enhanced with hypofractionation, localized dose escalation, and, in particle therapy, with optimized distribution of linear energy transfer (LET). The authors describe a method to construct inhomogeneous fractional dose (IFD) distributions, and evaluate the potential gain in the therapeutic effect from their delivery in proton therapy delivered by pencil beam scanning. For 13 cases of prostate cancer, the authors considered hypofractionated courses of 60 Gy delivered in 20 fractions. (All doses denoted in Gy include the proton's mean relative biological effectiveness (RBE) of 1.1.) Two types of plans were optimized using two opposed lateral beams to deliver a uniform dose of 3 Gy per fraction to the target by scanning: (1) in conventional full-target plans (FTP), each beam irradiated the entire gland, (2) in split-target plans (STP), beams irradiated only the respective proximal hemispheres (prostate split sagittally). Inverse planning yielded intensity maps, in which discrete position control points of the scanned beam (spots) were assigned optimized intensity values. FTP plans preferentially required a higher intensity of spots in the distal part of the target, while STP, by design, employed proximal spots. To evaluate the utility of IFD delivery, IFD plans were generated by rearranging the spot intensities from FTP or STP intensity maps, separately as well as combined using a variety of mixing weights. IFD courses were designed so that, in alternating fractions, one of the hemispheres of the prostate would receive a dose boost and the other receive a lower dose, while the total physical dose from the IFD course was roughly uniform across the prostate. IFD plans were normalized so that the equivalent uniform dose (EUD) of rectum and bladder did not increase, compared to the baseline FTP plan, which irradiated the prostate uniformly in every fraction. An EUD-based model was then applied to estimate tumor control probability

  2. Maximal safe dose of I-131 after failure of standard fixed dose therapy in patients with differentiated thyroid carcinoma

    International Nuclear Information System (INIS)

    Lee, Jong-Jin; Chung, June-Key; Kim, Sung-Eun; Kang, Won-Jun; Park, Do-Joon; Lee, Dong-Soo; Cho, Bo-Youn; Lee, Myung-Chul

    2008-01-01

    The maximal safe dose (MSD) on the basis of bone marrow irradiation levels allows the delivery of a large amount of I-131 to thyroid cancer tissue. The efficacy of MSD therapy in differentiated metastatic thyroid cancers that persisted after conventional fixed dose therapy is investigated. Forty-seven differentiated thyroid carcinoma patients with non-responsive residual disease despite repetitive fixed dose I-131 therapy were enrolled in this study. Their postoperative pathologies were 43 papillary carcinomas and 4 follicular carcinomas. The MSD was calculated with the Memorial Sloan-Kettering Cancer Center protocol using serial blood samples. The MSDs were administered at intervals of 6 months. Treatment responses were evaluated using I-131 whole-body scans and serum thyroglobulin measurements. The mean calculated MSD was 12.5±2.1 GBq (339.6±57.5 mCi). Of the 46 patients, 7 (14.9%) showed complete remission, 15 (31.9%) partial remission, 19 (40.4%) stable disease, and 6 (12.8%) disease progression. Of the patients who showed complete or partial remission, 15 (65%) showed response after the first MSD session and 6 (26%) showed response after the second session. Twenty-nine patients (62%) experienced transient cytopenia after therapy, but three did not recover to the baseline level. The maximal safe dose provides an effective means of treatment in patients who failed to respond adequately to conventional fixed dose therapy. I-131 MSD therapy can be considered in patients who fail fixed dose therapy. (author)

  3. Spinal Cord Doses in Palliative Lung Radiotherapy Schedules

    International Nuclear Information System (INIS)

    Ffrrcsi, F.H.; Parton, C.

    2006-01-01

    Aim: We aim to check the safety of the standard palliative radiotherapy techniques by using the Linear quadratic model for a careful estimation of the doses received by the spinal cord, in all standard palliative lung radiotherapy fields and fractionation. Material and Methods: All patients surveyed at this prospective audit were treated with palliative chest radio-therapy for lung cancer over a period from January to June 2005 by different clinical oncology specialists within the department. Radiotherapy field criteria were recorded and compared with the recommended limits of the MRC trial protocols for the dose and fractionation prescribed. Doses delivered to structures off the field central axis were estimated using a standard CT scan of the chest. Dose estimates were made using an SLPLAN planning system. As unexpected spinal cord toxicity has been reported after hypo fractionated chest radiotherapy, a sagittal view was used to calculate the isodoses along the length of the spinal cord that could lie within the RT field. Equivalent dose estimates are made using the Linear Quadratic Equivalent Dose formula (LQED). The relative radiation sensitivity of spinal cord for myelopathy (the a/b dose) cord has been estimated as a/b = 1 Gy. Results: 17 Gy in 2 fraction and 39 Gy in 13 fraction protocols have spinal cord equivalent doses (using the linear-quadratic model) that lie within the conventional safe limits of 50 Gy in 25 fractions for the 100% isodose. However when the dosimetry is modelled for a 6 MV 100 cm isocentric linac in 3 dimensions, and altered separations and air space inhomogeneity are considered, the D-Max doses consistently fall above this limit on our 3 model patients. Conclusion: The 17 Gy in 2 fraction and 39 Gy in 13 fraction protocol would risk spinal cord damage if the radio therapist was unaware of the potential spinal cord doses. Alterative doses are suggested below 15.5 Gy/ 2 fractions (7 days apart) would be most acceptable

  4. Biosphere Dose Conversion Factors for Reasonably Maximally Exposed Individual and Average Member of Critical Group

    International Nuclear Information System (INIS)

    K. Montague

    2000-01-01

    The purpose of this calculation is to develop additional Biosphere Dose Conversion Factors (BDCFs) for a reasonably maximally exposed individual (RMEI) for the periods 10,000 years and 1,000,000 years after the repository closure. In addition, Biosphere Dose Conversion Factors for the average member of a critical group are calculated for those additional radionuclides postulated to reach the environment during the period after 10,000 years and up to 1,000,000 years. After the permanent closure of the repository, the engineered systems within the repository will eventually lose their abilities to contain radionuclide inventory, and the radionuclides will migrate through the geosphere and eventually enter the local water table moving toward inhabited areas. The primary release scenario is a groundwater well used for drinking water supply and irrigation, and this calculation takes these postulated releases and follows them through various pathways until they result in a dose to either a member of critical group or a reasonably maximally exposed individual. The pathways considered in this calculation include inhalation, ingestion, and direct exposure

  5. Optimizing fluorescently tethered Hsp90 inhibitor dose for maximal specific uptake by breast tumors

    Science.gov (United States)

    Crouch, Brian T.; Duer, Joy; Wang, Roujia; Gallagher, Jennifer; Hall, Allison; Soo, Mary Scott; Hughes, Philip; Haystead, Timothy A. J.; Ramanujam, Nirmala

    2018-03-01

    Despite improvements in surgical resection, 20-40% of patients undergoing breast conserving surgery require at least one additional re-excision. Leveraging the unique surface expression of heat shock protein 90 (Hsp90), a chaperone protein involved in several key hallmarks of cancer, in breast cancer provides an exciting opportunity to identify residual disease during surgery. We developed a completely non-destructive strategy using HS-27, a fluorescently-tethered Hsp90 inhibitor, to assay surface Hsp90 expression on intact tissue specimens using a fluorescence microendoscope with a field of view of 750 μm and subcellular resolution of 4 μm. HS-27 consists of an FDA approved Hsp90 inhibitor tethered to fluorescein isothiocyanate (EX 488nm, EM 525nm). Here, we optimized ex vivo HS-27 administration in pre-clinical breast cancer models and validated our approach on 21 patients undergoing standard of care ultrasound guided core needle biopsy. HS-27 administration time was fixed at 1- minute to minimize imaging impact on clinical workflow. HS-27 and HS-217 (non-specific control) doses were modulated from 1 μM up to 100 μM to identify the dose maximizing the ratio of specific uptake (HS-27 fluorescence) to non-specific uptake (HS-217 fluorescence). The specificity ratio was maximized at 100 μM and was significantly greater than all other doses (pcancer makes this technology attractive for assessing tumor margins, as one agent can be used for all subtypes.

  6. Maximal safe dose therapy of I-131 after failure of standard fixed dose therapy in patients with differentiated thyroid carcinoma

    International Nuclear Information System (INIS)

    Lee, Jong Jin; Seok, Ju Won; Uh, Jae Sun

    2005-01-01

    In patients with recurrent or metastatic differentiated thyroid carcinoma, residual disease despite repetitive fixed dose I-131 therapy presents an awkward situation in terms of treatment decision making. Maximal safe dose (MSD) administration base on bone marrow radiation allows the delivery of a large amount I-131 to thyroid cancer tissue within the safety margin. We investigated the efficacy of MSD in differentiated thyroid cancers, which had persisted after conventional fixed dose therapy. Forty-six patients with differentiated thyroid carcinoma who had non-responsible residual disease despite repetitive fixed dose I-131 therapy were enrolled in this study. The postoperative pathology consisted of 43 papillary carcinomas and 3 follicular carcinomas. MSD was calculated according the Memorial Sloan Kettering Cancer Center protocol using blood samples. MSDs were administered at intervals of at least 6 months. Treatment responses were evaluated using I-131 whole body scan (WBS) and serum thyroglobulin measurements. Mean calculated MSD was 12.5±2.1 GBq. Of the 46 patients, 6 (13.0%) showed complete remission, 15 (32.6%) partial response, 19 (41.3%) stable disease, and 6 (13.0%) disease progression. Thus, about a half of the patients showed complete or partial remission, and of these patients, 14 (67%) showed response after a single MSD administration and 6 (29%) showed response after the second dose of MSD administrations. Twenty-nine patients (63%) experienced transient cytopenia after therapy, and recovered spontaneously with the exception of one. MSD administration is an effective method even in the patients who failed to be treated by conventional fixed dose therapy. MSD therapy of I-131 can be considered in the patients who failed by fixed dose therapy

  7. Comparison of two dose and three dose human papillomavirus vaccine schedules: cost effectiveness analysis based on transmission model.

    Science.gov (United States)

    Jit, Mark; Brisson, Marc; Laprise, Jean-François; Choi, Yoon Hong

    2015-01-06

    To investigate the incremental cost effectiveness of two dose human papillomavirus vaccination and of additionally giving a third dose. Cost effectiveness study based on a transmission dynamic model of human papillomavirus vaccination. Two dose schedules for bivalent or quadrivalent human papillomavirus vaccines were assumed to provide 10, 20, or 30 years' vaccine type protection and cross protection or lifelong vaccine type protection without cross protection. Three dose schedules were assumed to give lifelong vaccine type and cross protection. United Kingdom. Males and females aged 12-74 years. No, two, or three doses of human papillomavirus vaccine given routinely to 12 year old girls, with an initial catch-up campaign to 18 years. Costs (from the healthcare provider's perspective), health related utilities, and incremental cost effectiveness ratios. Giving at least two doses of vaccine seems to be highly cost effective across the entire range of scenarios considered at the quadrivalent vaccine list price of £86.50 (€109.23; $136.00) per dose. If two doses give only 10 years' protection but adding a third dose extends this to lifetime protection, then the third dose also seems to be cost effective at £86.50 per dose (median incremental cost effectiveness ratio £17,000, interquartile range £11,700-£25,800). If two doses protect for more than 20 years, then the third dose will have to be priced substantially lower (median threshold price £31, interquartile range £28-£35) to be cost effective. Results are similar for a bivalent vaccine priced at £80.50 per dose and when the same scenarios are explored by parameterising a Canadian model (HPV-ADVISE) with economic data from the United Kingdom. Two dose human papillomavirus vaccine schedules are likely to be the most cost effective option provided protection lasts for at least 20 years. As the precise duration of two dose schedules may not be known for decades, cohorts given two doses should be closely

  8. Comparison of 2-Dose and 3-Dose 9-Valent Human Papillomavirus Vaccine Schedules in the United States: A Cost-effectiveness Analysis.

    Science.gov (United States)

    Laprise, Jean-François; Markowitz, Lauri E; Chesson, Harrell W; Drolet, Mélanie; Brisson, Marc

    2016-09-01

    A recent clinical trial using the 9-valent human papillomavirus virus (HPV) vaccine has shown that antibody responses after 2 doses are noninferior to those after 3 doses, suggesting that 2 and 3 doses may have comparable vaccine efficacy. We used an individual-based transmission-dynamic model to compare the population-level effectiveness and cost-effectiveness of 2- and 3-dose schedules of 9-valent HPV vaccine in the United States. Our model predicts that if 2 doses of 9-valent vaccine protect for ≥20 years, the additional benefits of a 3-dose schedule are small as compared to those of 2-dose schedules, and 2-dose schedules are likely much more cost-efficient than 3-dose schedules. © The Author 2016. Published by Oxford University Press for the Infectious Diseases Society of America. All rights reserved. For permissions, e-mail journals.permissions@oup.com.

  9. Optimal treatment scheduling of ionizing radiation and sunitinib improves the antitumor activity and allows dose reduction

    International Nuclear Information System (INIS)

    Kleibeuker, Esther A; Hooven, Matthijs A ten; Castricum, Kitty C; Honeywell, Richard; Griffioen, Arjan W; Verheul, Henk M; Slotman, Ben J; Thijssen, Victor L

    2015-01-01

    The combination of radiotherapy with sunitinib is clinically hampered by rare but severe side effects and varying results with respect to clinical benefit. We studied different scheduling regimes and dose reduction in sunitinib and radiotherapy in preclinical tumor models to improve potential outcome of this combination treatment strategy. The chicken chorioallantoic membrane (CAM) was used as an angiogenesis in vivo model and as a xenograft model with human tumor cells (HT29 colorectal adenocarcinoma, OE19 esophageal adenocarcinoma). Treatment consisted of ionizing radiation (IR) and sunitinib as single therapy or in combination, using different dose-scheduling regimes. Sunitinib potentiated the inhibitory effect of IR (4 Gy) on angiogenesis. In addition, IR (4 Gy) and sunitinib (4 days of 32.5 mg/kg per day) inhibited tumor growth. Ionizing radiation induced tumor cell apoptosis and reduced proliferation, whereas sunitinib decreased tumor angiogenesis and reduced tumor cell proliferation. When IR was applied before sunitinib, this almost completely inhibited tumor growth, whereas concurrent IR was less effective and IR after sunitinib had no additional effect on tumor growth. Moreover, optimal scheduling allowed a 50% dose reduction in sunitinib while maintaining comparable antitumor effects. This study shows that the therapeutic efficacy of combination therapy improves when proper dose-scheduling is applied. More importantly, optimal treatment regimes permit dose reductions in the angiogenesis inhibitor, which will likely reduce the side effects of combination therapy in the clinical setting. Our study provides important leads to optimize combination treatment in the clinical setting

  10. Immunogenicity to poliovirus type 2 following two doses of fractional intradermal inactivated poliovirus vaccine: A novel dose sparing immunization schedule.

    Science.gov (United States)

    Anand, Abhijeet; Molodecky, Natalie A; Pallansch, Mark A; Sutter, Roland W

    2017-05-19

    The polio eradication endgame strategic plan calls for the sequential removal of Sabin poliovirus serotypes from the trivalent oral poliovirus vaccine (tOPV), starting with type 2, and the introduction of ≥1 dose of inactivated poliovirus vaccine (IPV), to maintain an immunity base against poliovirus type 2. The global removal of oral poliovirus type 2 was successfully implemented in May 2016. However, IPV supply constraints has prevented introduction in 21 countries and led to complete stock-out in >20 countries. We conducted a literature review and contacted corresponding authors of recent studies with fractional-dose IPV (fIPV), one-fifth of intramuscular dose administered intradermally, to conduct additional type 2 immunogenicity analyses of two fIPV doses compared with one full-dose IPV. Four studies were identified that assessed immunogenicity of two fIPV doses compared to one full-dose IPV. Two fractional doses are more immunogenic than 1 full-dose, with type 2 seroconversion rates improving between absolute 19-42% (median: 37%, pvaccine compared to one full-dose IPV. In response to the current IPV shortage, a schedule of two fIPV doses at ages 6 and 14weekshas been endorsed by technical oversight committees and has been introduced in some affected countries. Copyright © 2017. Published by Elsevier Ltd.

  11. Mathematical modeling identifies optimum lapatinib dosing schedules for the treatment of glioblastoma patients.

    Directory of Open Access Journals (Sweden)

    Shayna Stein

    2018-01-01

    Full Text Available Human primary glioblastomas (GBM often harbor mutations within the epidermal growth factor receptor (EGFR. Treatment of EGFR-mutant GBM cell lines with the EGFR/HER2 tyrosine kinase inhibitor lapatinib can effectively induce cell death in these models. However, EGFR inhibitors have shown little efficacy in the clinic, partly because of inappropriate dosing. Here, we developed a computational approach to model the in vitro cellular dynamics of the EGFR-mutant cell line SF268 in response to different lapatinib concentrations and dosing schedules. We then used this approach to identify an effective treatment strategy within the clinical toxicity limits of lapatinib, and developed a partial differential equation modeling approach to study the in vivo GBM treatment response by taking into account the heterogeneous and diffusive nature of the disease. Despite the inability of lapatinib to induce tumor regressions with a continuous daily schedule, our modeling approach consistently predicts that continuous dosing remains the best clinically feasible strategy for slowing down tumor growth and lowering overall tumor burden, compared to pulsatile schedules currently known to be tolerated, even when considering drug resistance, reduced lapatinib tumor concentrations due to the blood brain barrier, and the phenotypic switch from proliferative to migratory cell phenotypes that occurs in hypoxic microenvironments. Our mathematical modeling and statistical analysis platform provides a rational method for comparing treatment schedules in search for optimal dosing strategies for glioblastoma and other cancer types.

  12. Objective method to report planner-independent skin/rib maximal dose in balloon-based high dose rate (HDR) brachytherapy for breast cancer

    International Nuclear Information System (INIS)

    Kim, Yongbok; Trombetta, Mark G.

    2011-01-01

    Purpose: An objective method was proposed and compared with a manual selection method to determine planner-independent skin and rib maximal dose in balloon-based high dose rate (HDR) brachytherapy planning. Methods: The maximal dose to skin and rib was objectively extracted from a dose volume histogram (DVH) of skin and rib volumes. A virtual skin volume was produced by expanding the skin surface in three dimensions (3D) external to the breast with a certain thickness in the planning computed tomography (CT) images. Therefore, the maximal dose to this volume occurs on the skin surface the same with a conventional manual selection method. The rib was also delineated in the planning CT images and its maximal dose was extracted from its DVH. The absolute (Abdiff=|D max Man -D max DVH |) and relative (Rediff[%]=100x(|D max Man -D max DVH |)/D max DVH ) maximal skin and rib dose differences between the manual selection method (D max Man ) and the objective method (D max DVH ) were measured for 50 balloon-based HDR (25 MammoSite and 25 Contura) patients. Results: The average±standard deviation of maximal dose difference was 1.67%±1.69% of the prescribed dose (PD). No statistical difference was observed between MammoSite and Contura patients for both Abdiff and Rediff[%] values. However, a statistically significant difference (p value max >90%) compared with lower dose range (D max <90%): 2.16%±1.93% vs 1.19%±1.25% with p value of 0.0049. However, the Rediff[%] analysis eliminated the inverse square factor and there was no statistically significant difference (p value=0.8931) between high and low dose ranges. Conclusions: The objective method using volumetric information of skin and rib can determine the planner-independent maximal dose compared with the manual selection method. However, the difference was <2% of PD, on average, if appropriate attention is paid to selecting a manual dose point in 3D planning CT images.

  13. An estimate of the maximal doses incurred by persons accompanying patients in the waiting area of a nuclear medicine department

    International Nuclear Information System (INIS)

    Dzik-Jurasz, A.S.K.; Farwell, J.

    1997-01-01

    The aim of the study was to make an estimate of the maximal doses that might be incurred by persons accompanying active patients in a nuclear medicine department waiting area. This was in order to determine whether the dose to such individuals approached current legislative or recently recommended limits. Thermoluminescent dosemeters were taped to the walls of the waiting area at waist level to the sitting individual, such that their record would reflect as closely as possible the dose incurred by an individual sitting next to an active patient. Dividing the recorded dose with the total occupancy time of that seat derived an average dose rate. Maximal doses were estimated by the product of the latter and maximal occupancy times. It was assumed that an accompanying individual would have been sitting next to the active patient for their whole duration of stay. The maximum estimates were 278 μSv and 103.2 μSv. These values are likely to be overestimates by the virtue of the TLD integrating the whole dose of its surrounds, especially adjacent active individuals. By current legislation and recent recommendations the values are reassuringly low, but idiosyncrasies in local practice might need to be considered in individual departments. (author)

  14. Radical radiotherapy for invasive bladder cancer: What dose and fractionation schedule to choose?

    International Nuclear Information System (INIS)

    Pos, Floris J.; Hart, Guus; Schneider, Christoph; Sminia, Peter

    2006-01-01

    Purpose: To establish the α/β ratio of bladder cancer from different radiotherapy schedules reported in the literature and provide guidelines for the design of new treatment schemes. Methods and Materials: Ten external beam radiotherapy (EBRT) and five brachytherapy schedules were selected. The biologically effective dose (BED) of each schedule was calculated. Logistic modeling was used to describe the relationship between 3-year local control (LC3y) and BED. Results: The estimated α/β ratio was 13 Gy (95% confidence interval [CI], 2.5-69 Gy) for EBRT and 24 Gy (95% CI, 1.3-460 Gy) for EBRT and brachytherapy combined. There is evidence for an overall dose-response relationship. After an increase in total dose of 10 Gy, the odds of LC3y increase by a factor of 1.44 (95% CI, 1.23-1.70) for EBRT and 1.47 (95% CI, 1.25-1.72) for the data sets of EBRT and brachytherapy combined. Conclusion: With the clinical data currently available, a reliable estimation of the α/β ratio for bladder cancer is not feasible. It seems reasonable to use a conventional α/β ratio of 10-15 Gy. Dose escalation could significantly increase local control. There is no evidence to support short overall treatment times or large fraction sizes in radiotherapy for bladder cancer

  15. Effects of maximal doses of atorvastatin versus rosuvastatin on small dense low-density lipoprotein cholesterol levels

    Science.gov (United States)

    Maximal doses of atorvastatin and rosuvastatin are highly effective in lowering low-density lipoprotein (LDL) cholesterol and triglyceride levels; however, rosuvastatin has been shown to be significantly more effective than atorvastatin in lowering LDL cholesterol and in increasing high-density lipo...

  16. Preoperative chemoradiation for locally advanced rectal cancer: comparison of three radiation dose and fractionation schedules

    International Nuclear Information System (INIS)

    Park, Shin Hyung; Kim, Jae Chul

    2016-01-01

    The standard radiation dose for patients with locally rectal cancer treated with preoperative chemoradiotherapy is 45–50 Gy in 25–28 fractions. We aimed to assess whether a difference exists within this dose fractionation range. A retrospective analysis was performed to compare three dose fractionation schedules. Patients received 50 Gy in 25 fractions (group A), 50.4 Gy in 28 fractions (group B), or 45 Gy in 25 fractions (group C) to the whole pelvis, as well as concurrent 5-fluorouracil. Radical resection was scheduled for 8 weeks after concurrent chemoradiotherapy. Between September 2010 and August 2013, 175 patients were treated with preoperative chemoradiotherapy at our institution. Among those patients, 154 were eligible for analysis (55, 50, and 49 patients in groups A, B, and C, respectively). After the median follow-up period of 29 months (range, 5 to 48 months), no differences were found between the 3 groups regarding pathologic complete remission rate, tumor regression grade, treatment-related toxicity, 2-year locoregional recurrence-free survival, distant metastasis-free survival, disease-free survival, or overall survival. The circumferential resection margin width was a prognostic factor for 2-year locoregional recurrence-free survival, whereas ypN category was associated with distant metastasis-free survival, disease-free survival, and overall survival. High tumor regression grading score was correlated with 2-year distant metastasis-free survival and disease-free survival in univariate analysis. Three different radiation dose fractionation schedules, within the dose range recommended by the National Comprehensive Cancer Network, had no impact on pathologic tumor regression and early clinical outcome for locally advanced rectal cancer

  17. Preoperative chemoradiation for locally advanced rectal cancer: comparison of three radiation dose and fractionation schedules

    Energy Technology Data Exchange (ETDEWEB)

    Park, Shin Hyung; Kim, Jae Chul [Dept. of Radiation Oncology, Kyungpook National University School of Medicine, Daegu (Korea, Republic of)

    2016-06-15

    The standard radiation dose for patients with locally rectal cancer treated with preoperative chemoradiotherapy is 45–50 Gy in 25–28 fractions. We aimed to assess whether a difference exists within this dose fractionation range. A retrospective analysis was performed to compare three dose fractionation schedules. Patients received 50 Gy in 25 fractions (group A), 50.4 Gy in 28 fractions (group B), or 45 Gy in 25 fractions (group C) to the whole pelvis, as well as concurrent 5-fluorouracil. Radical resection was scheduled for 8 weeks after concurrent chemoradiotherapy. Between September 2010 and August 2013, 175 patients were treated with preoperative chemoradiotherapy at our institution. Among those patients, 154 were eligible for analysis (55, 50, and 49 patients in groups A, B, and C, respectively). After the median follow-up period of 29 months (range, 5 to 48 months), no differences were found between the 3 groups regarding pathologic complete remission rate, tumor regression grade, treatment-related toxicity, 2-year locoregional recurrence-free survival, distant metastasis-free survival, disease-free survival, or overall survival. The circumferential resection margin width was a prognostic factor for 2-year locoregional recurrence-free survival, whereas ypN category was associated with distant metastasis-free survival, disease-free survival, and overall survival. High tumor regression grading score was correlated with 2-year distant metastasis-free survival and disease-free survival in univariate analysis. Three different radiation dose fractionation schedules, within the dose range recommended by the National Comprehensive Cancer Network, had no impact on pathologic tumor regression and early clinical outcome for locally advanced rectal cancer.

  18. A spatially encoded dose difference maximal intensity projection map for patient dose evaluation: A new first line patient quality assurance tool

    Energy Technology Data Exchange (ETDEWEB)

    Hu Weigang; Graff, Pierre; Boettger, Thomas; Pouliot, Jean [Department of Radiation Oncology, University of California, San Francisco, San Francisco, California 94143 (United States); and others

    2011-04-15

    Purpose: To develop a spatially encoded dose difference maximal intensity projection (DD-MIP) as an online patient dose evaluation tool for visualizing the dose differences between the planning dose and dose on the treatment day. Methods: Megavoltage cone-beam CT (MVCBCT) images acquired on the treatment day are used for generating the dose difference index. Each index is represented by different colors for underdose, acceptable, and overdose regions. A maximal intensity projection (MIP) algorithm is developed to compress all the information of an arbitrary 3D dose difference index into a 2D DD-MIP image. In such an algorithm, a distance transformation is generated based on the planning CT. Then, two new volumes representing the overdose and underdose regions of the dose difference index are encoded with the distance transformation map. The distance-encoded indices of each volume are normalized using the skin distance obtained on the planning CT. After that, two MIPs are generated based on the underdose and overdose volumes with green-to-blue and green-to-red lookup tables, respectively. Finally, the two MIPs are merged with an appropriate transparency level and rendered in planning CT images. Results: The spatially encoded DD-MIP was implemented in a dose-guided radiotherapy prototype and tested on 33 MVCBCT images from six patients. The user can easily establish the threshold for the overdose and underdose. A 3% difference between the treatment and planning dose was used as the threshold in the study; hence, the DD-MIP shows red or blue color for the dose difference >3% or {<=}3%, respectively. With such a method, the overdose and underdose regions can be visualized and distinguished without being overshadowed by superficial dose differences. Conclusions: A DD-MIP algorithm was developed that compresses information from 3D into a single or two orthogonal projections while hinting the user whether the dose difference is on the skin surface or deeper.

  19. A spatially encoded dose difference maximal intensity projection map for patient dose evaluation: a new first line patient quality assurance tool.

    Science.gov (United States)

    Hu, Weigang; Graff, Pierre; Boettger, Thomas; Pouliot, Jean

    2011-04-01

    To develop a spatially encoded dose difference maximal intensity projection (DD-MIP) as an online patient dose evaluation tool for visualizing the dose differences between the planning dose and dose on the treatment day. Megavoltage cone-beam CT (MVCBCT) images acquired on the treatment day are used for generating the dose difference index. Each index is represented by different colors for underdose, acceptable, and overdose regions. A maximal intensity projection (MIP) algorithm is developed to compress all the information of an arbitrary 3D dose difference index into a 2D DD-MIP image. In such an algorithm, a distance transformation is generated based on the planning CT. Then, two new volumes representing the overdose and underdose regions of the dose difference index are encoded with the distance transformation map. The distance-encoded indices of each volume are normalized using the skin distance obtained on the planning CT. After that, two MIPs are generated based on the underdose and overdose volumes with green-to-blue and green-to-red lookup tables, respectively. Finally, the two MIPs are merged with an appropriate transparency level and rendered in planning CT images. The spatially encoded DD-MIP was implemented in a dose-guided radiotherapy prototype and tested on 33 MVCBCT images from six patients. The user can easily establish the threshold for the overdose and underdose. A 3% difference between the treatment and planning dose was used as the threshold in the study; hence, the DD-MIP shows red or blue color for the dose difference > 3% or < or = 3%, respectively. With such a method, the overdose and underdose regions can be visualized and distinguished without being overshadowed by superficial dose differences. A DD-MIP algorithm was developed that compresses information from 3D into a single or two orthogonal projections while hinting the user whether the dose difference is on the skin surface or deeper.

  20. Association Between Maximal Skin Dose and Breast Brachytherapy Outcome: A Proposal for More Rigorous Dosimetric Constraints

    International Nuclear Information System (INIS)

    Cuttino, Laurie W.; Heffernan, Jill; Vera, Robyn; Rosu, Mihaela; Ramakrishnan, V. Ramesh; Arthur, Douglas W.

    2011-01-01

    Purpose: Multiple investigations have used the skin distance as a surrogate for the skin dose and have shown that distances 4.05 Gy/fraction. Conclusion: The initial skin dose recommendations have been based on safe use and the avoidance of significant toxicity. The results from the present study have suggested that patients might further benefit if more rigorous constraints were applied and if the skin dose were limited to 120% of the prescription dose.

  1. Optimal scheduling of biocide dosing for seawater-cooled power and desalination plants

    KAUST Repository

    Mahfouz, Abdullah Bin

    2011-02-13

    Thermal desalination systems are typically integrated with power plants to exploit the excess heat resulting from the power-generation units. Using seawater in cooling the power plant and the desalination system is a common practice in many parts of the world where there is a shortage of freshwater. Biofouling is one of the major problems associated with the usage of seawater in cooling systems. Because of the dynamic variation in the power and water demands as well as the changes in the characteristics of seawater and the process, there is a need to develop an optimal policy for scheduling biocide usage and cleaning maintenance of the heat exchangers. The objective of this article is to introduce a systematic procedure for the optimization of scheduling the dosing of biocide and dechlorination chemicals as well as cleaning maintenance for a power production/thermal desalination plant. A multi-period optimization formulation is developed and solved to determine: the optimal levels of dosing and dechlorination chemicals; the timing of maintenance to clean the heat-exchange surfaces; and the dynamic dependence of the biofilm growth on the applied doses, the seawater-biocide chemistry, the process conditions, and seawater characteristics for each time period. The technical, economic, and environmental considerations of the system are accounted for. A case study is solved to elucidate the applicability of the developed optimization approach. © 2011 Springer-Verlag.

  2. Effect of a simple dose-escalation schedule on tramadol tolerability : assessment in the clinical setting.

    Science.gov (United States)

    Tagarro, I; Herrera, J; Barutell, C; Díez, M C; Marín, M; Samper, D; Busquet, C; Rodríguez, M J

    2005-01-01

    To assess the effect of a very simple dose-escalation schedule on tramadol tolerability in clinical practice. This schedule consists of starting treatment with sustained-release tramadol 50mg twice daily, and escalating the dose around 7 days later to 100mg twice daily. Data from 1925 outpatients with non-malignant chronic pain were collected in this multicentre, prospective, comparative, non-randomised, open, observational study. A total of 1071 patients (55.6%) were included in the dose-escalation group (50mg group) and 854 patients (44.4%) in the control group (sustained-release tramadol 100mg twice daily; 100mg group). The proportion of patients who interrupted tramadol treatment due to the occurrence of adverse reactions was significantly lower in the 50mg group (5.6%) than in the 100mg group (12.6%) [p = 0.001]. In line with this, the proportion of patients who experienced at least one adverse reaction was significantly lower in the 50mg group (18.4%) than in the 100mg group (30.4%) [p = 0.001] and, interestingly, the two most frequently reported adverse reactions, nausea and dizziness, were found with a significantly lower frequency in the 50mg group (p < 0.001). Multivariate analysis showed that the risk of safety-related treatment cessations was 2.3 times higher in the 100mg group than in the 50mg group, and 2.2 times higher in females than in males. The two treatments were equally effective in reducing pain intensity (p = 0.121), measured as a reduction in pain score obtained by means of a visual analogue scale. The instauration of tramadol treatment, starting with sustained-release 50mg capsules twice daily and escalating the dose some days later to 100mg twice daily, was shown to be an effective and easy way to improve tramadol tolerability in clinical practice, whilst maintaining its analgesic efficacy.

  3. Factors influencing completion of multi-dose vaccine schedules in adolescents: a systematic review

    Directory of Open Access Journals (Sweden)

    K. E. Gallagher

    2016-02-01

    Full Text Available Abstract Background Completion of multiple dose vaccine schedules is crucial to ensure a protective immune response, and maximise vaccine cost-effectiveness. While barriers and facilitators to vaccine uptake have recently been reviewed, there is no comprehensive review of factors influencing subsequent adherence or completion, which is key to achieving vaccine effectiveness. This study identifies and summarises the literature on factors affecting completion of multi-dose vaccine schedules by adolescents. Methods Ten online databases and four websites were searched (February 2014. Studies with analysis of factors predicting completion of multi-dose vaccines were included. Study participants within 9–19 years of age were included in the review. The defined outcome was completion of the vaccine series within 1 year among those who received the first dose. Results Overall, 6159 abstracts were screened, and 502 full texts were reviewed. Sixty one studies were eligible for this review. All except two were set in high-income countries. Included studies evaluated human papillomavirus vaccine, hepatitis A, hepatitis B, and varicella vaccines. Reported vaccine completion rates, among those who initiated vaccination, ranged from 27 % to over 90 %. Minority racial or ethnic groups and inadequate health insurance coverage were risk factors for low completion, irrespective of initiation rates. Parental healthcare seeking behaviour was positively associated with completion. Vaccine delivery in schools was associated with higher completion than delivery in the community or health facilities. Gender, prior healthcare use and socio-economic status rarely remained significant risks or protective factors in multivariate analysis. Conclusions Almost all studies investigating factors affecting completion have been carried out in developed countries and investigate a limited range of variables. Increased understanding of barriers to completion in adolescents will

  4. Scheduling of Domestic Water Heater Power Demand for Maximizing PV Self-Consumption Using Model Predictive Control

    DEFF Research Database (Denmark)

    Sossan, Fabrizio; Kosek, Anna Magdalena; Martinenas, Sergejus

    2013-01-01

    This paper presents a model predictive control (MPC) strategy for maximizing photo-voltaic (PV) selfconsumption in a household context exploiting the flexible demand of an electric water heater. The predictive controller uses a water heater model and forecast of the hot Water consumption in order...... to predict the future temperature of the water and it manages its state (on and off) according to the forecasted PV production, which are computed starting from forecast of the solar irradiance. Simulations for the proof of concept and for validating the proposed control strategy are proposed. Results...... of the control approach are compared with a traditional thermostatic controller using historical measurements of a 10 kW PV installation. Economic results based on the Italian self consumption tariffs are also reported. The model of the water heater complex is a mixed grey and white box and its parameters have...

  5. Ergogenic effect of varied doses of coffee-caffeine on maximal ...

    African Journals Online (AJOL)

    Endurance performance index (VO2 max, run time & number of exercise laps) were measured and recorded. Result: Repeated measures ANOVA was used to assess the level of significant difference between caffeine doses and placebo dose in VO2 max, run time and number of exercise laps. The result showed no ...

  6. Maximally effective dosing regimens of meropenem in patients with septic shock

    DEFF Research Database (Denmark)

    Sjövall, Fredrik; Alobaid, Abdulaziz S; Wallis, Steven C

    2018-01-01

    was required for both empirical and targeted treatment. In patients with a CL CR of ≤ 100 mL/min, successful concentration targets could be reached with intermittent dosing of 1000 mg/8 h. Conclusions: In patients with septic shock and possible augmented renal clearance, doses should be increased and...

  7. Optimization of the dose level for a given treatment plan to maximize the complication-free tumor cure

    International Nuclear Information System (INIS)

    Lind, B.K.; Mavroidis, P.; Hyoedynmaa, S.; Kappas, C.

    1999-01-01

    During the past decade, tumor and normal tissue reactions after radiotherapy have been increasingly quantified in radiobiological terms. For this purpose, response models describing the dependence of tumor and normal tissue reactions on the irradiated volume, heterogeneity of the delivered dose distribution and cell sensitivity variations can be taken into account. The probability of achieving a good treatment outcome can be increased by using an objective function such as P + , the probability of complication-free tumor control. A new procedure is presented, which quantifies P + from the dose delivery on 2D surfaces and 3D volumes and helps the user of any treatment planning system (TPS) to select the best beam orientations, the best beam modalities and the most suitable beam energies. The final step of selecting the prescribed dose level is made by a renormalization of the entire dose plan until the value of P + is maximized. The index P + makes use of clinically established dose-response parameters, for tumors and normal tissues of interest, in order to improve its clinical relevance. The results, using P + , are compared against the assessments of experienced medical physicists and radiation oncologists for two clinical cases. It is observed that when the absorbed dose level for a given treatment plan is increased, the treatment outcome first improves rapidly. As the dose approaches the tolerance of normal tissues the complication-free curve begins to drop. The optimal dose level is often just below this point and it depends on the geometry of each patient and target volume. Furthermore, a more conformal dose delivery to the target results in a higher control rate for the same complication level. This effect can be quantified by the increased value of the P + parameter. (orig.)

  8. A Practical and Robust Execution Time-Frame Procedure for the Multi-Mode Resource-Constrained Project Scheduling Problem with Minimal and Maximal Time Lags

    Directory of Open Access Journals (Sweden)

    Angela Hsiang-Ling Chen

    2016-09-01

    Full Text Available Modeling and optimizing organizational processes, such as the one represented by the Resource-Constrained Project Scheduling Problem (RCPSP, improve outcomes. Based on assumptions and simplification, this model tackles the allocation of resources so that organizations can continue to generate profits and reinvest in future growth. Nonetheless, despite all of the research dedicated to solving the RCPSP and its multi-mode variations, there is no standardized procedure that can guide project management practitioners in their scheduling tasks. This is mainly because many of the proposed approaches are either based on unrealistic/oversimplified scenarios or they propose solution procedures not easily applicable or even feasible in real-life situations. In this study, we solve a more true-to-life and complex model, Multimode RCPSP with minimal and maximal time lags (MRCPSP/max. The complexity of the model solved is presented, and the practicality of the proposed approach is justified depending on only information that is available for every project regardless of its industrial context. The results confirm that it is possible to determine a robust makespan and to calculate an execution time-frame with gaps lower than 11% between their lower and upper bounds. In addition, in many instances, the solved lower bound obtained was equal to the best-known optimum.

  9. Importance of dose-schedule of 5-aza-2'-deoxycytidine for epigenetic therapy of cancer

    International Nuclear Information System (INIS)

    Lemaire, Maryse; Chabot, Guy G; Raynal, Noël JM; Momparler, Louise F; Hurtubise, Annie; Bernstein, Mark L; Momparler, Richard L

    2008-01-01

    The inactivation of tumor suppressor genes (TSGs) by aberrant DNA methylation plays an important role in the development of malignancy. Since this epigenetic change is reversible, it is a potential target for chemotherapeutic intervention using an inhibitor of DNA methylation, such as 5-aza-2'-deoxycytidine (DAC). Although clinical studies show that DAC has activity against hematological malignancies, the optimal dose-schedule of this epigenetic agent still needs to be established. Clonogenic assays were performed on leukemic and tumor cell lines to evaluate the in vitro antineoplastic activity of DAC. The reactivation of TSGs and inhibition of DNA methylation by DAC were investigated by reverse transcriptase-PCR and Line-1 assays. The in vivo antineoplastic activity of DAC administered as an i.v. infusion was evaluated in mice with murine L1210 leukemia by measurement of survival time, and in mice bearing murine EMT6 mammary tumor by excision of tumor after chemotherapy for an in vitro clonogenic assay. Increasing the DAC concentration and duration of exposure produced a greater loss of clonogenicity for both human leukemic and tumor cell lines. The reactivation of the TSGs (p57KIP2 in HL-60 leukemic cells and p16CDKN2A in Calu-6 lung carcinoma cells) and the inhibition of global DNA methylation in HL-60 leukemic cells increased with DAC concentration. In mice with L1210 leukemia and in mice bearing EMT6 tumors, the antineoplastic action of DAC also increased with the dose. The plasma level of DAC that produced a very potent antineoplastic effect in mice with leukemia or solid tumors was > 200 ng/ml (> 1 μM). We have shown that intensification of the DAC dose markedly increased its antineoplastic activity in mouse models of cancer. Our data also show that there is a good correlation between the concentrations of DAC that reduce in vitro clonogenicity, reactivate TSGs and inhibit DNA methylation. These results suggest that the antineoplastic action of DAC is

  10. High-dose inhaled terbutaline increases muscle strength and enhances maximal sprint performance in trained men

    DEFF Research Database (Denmark)

    Hostrup, Morten; Kalsen, Anders; Bangsbo, Jens

    2014-01-01

    ) participated in a double-blinded randomized crossover study. After administration of inhaled terbutaline (30 × 0.5 mg) or placebo, subjects' maximal voluntary isometric contraction (MVC) of m.quadriceps was measured. After MVC, subjects performed a 30-s Wingate test. Sixty minutes following the Wingate test......, subjects exercised for 10 min at 80 % of [Formula: see text] and completed a 100-kcal time trial. Aerobic contribution was determined during the Wingate test by indirect calorimetry. Furthermore, plasma terbutaline, lactate, glucose, and K(+) were measured. RESULTS: Inhalation of 15 mg terbutaline resulted...... = 0.019) and 3.3 ± 1.0 % (P = 0.009) higher for terbutaline than placebo. Net accumulation of plasma lactate was higher (P = 0.003) for terbutaline than placebo during the Wingate test, whereas [Formula: see text] above baseline was unchanged by terbutaline (P = 0.882). Time-trial performance...

  11. Design of spray dried insulin microparticles to bypass deposition in the extrathoracic region and maximize total lung dose.

    Science.gov (United States)

    Ung, Keith T; Rao, Nagaraja; Weers, Jeffry G; Huang, Daniel; Chan, Hak-Kim

    2016-09-25

    Inhaled drugs all too often deliver only a fraction of the emitted dose to the target lung site due to deposition in the extrathoracic region (i.e., mouth and throat), which can lead to increased variation in lung exposure, and in some instances increases in local and systemic side effects. For aerosol medications, improved targeting to the lungs may be achieved by tailoring the micromeritic properties of the particles (e.g., size, density, rugosity) to minimize deposition in the mouth-throat and maximize the total lung dose. This study evaluated a co-solvent spray drying approach to modulate particle morphology and dose delivery characteristics of engineered powder formulations of insulin microparticles. The binary co-solvent system studied included water as the primary solvent mixed with an organic co-solvent, e.g., ethanol. Factors such as the relative rate of evaporation of each component of a binary co-solvent mixture, and insulin solubility in each component were considered in selecting feedstock compositions. A water-ethanol co-solvent mixture with a composition range considered suitable for modulating particle shell formation during drying was selected for experimental investigation. An Alberta Idealized Throat model was used to evaluate the in vitro total lung dose of a series of spray dried insulin formulations engineered with different bulk powder properties and delivered with two prototype inhalers that fluidize and disperse powder using different principles. The in vitro total lung dose of insulin microparticles was improved and favored for powders with low bulk density and small primary particle size, with reduction of deposition in the extrathoracic region. The results demonstrated that a total lung dose >95% of the delivered dose can be achieved with engineered particles, indicating a high degree of lung targeting, almost completely bypassing deposition in the mouth-throat. Copyright © 2016 Elsevier B.V. All rights reserved.

  12. A cyclotron isotope production facility designed to maximize production and minimize radiation dose

    International Nuclear Information System (INIS)

    Dickie, W.J.; Stevenson, N.R.; Szlavik, F.F.

    1993-01-01

    Continuing increases in requirements from the nuclear medicine industry for cyclotron isotopes is increasing the demands being put on an aging stock of machines. In addition, with the 1990 recommendations of the ICRP publication in place, strict dose limits will be required and this will have an effect on the way these machines are being operated. Recent advances in cyclotron design combined with lessons learned from two decades of commercial production mean that new facilities can result in a substantial charge on target, low personnel dose, and minimal residual activation. An optimal facility would utilize a well engineered variable energy/high current H - cyclotron design, multiple beam extraction, and individual target caves. Materials would be selected to minimize activation and absorb neutrons. Equipment would be designed to minimize maintenance activities performed in high radiation fields. (orig.)

  13. A consideration of distributions and treatment schedules in high dose rate intracavitary therapy of carcinoma of the uterine cervix

    International Nuclear Information System (INIS)

    Sakata, Suoh; Sato, Sigehiro; Nakano, Masao; Iida, Koyo; Yui, Nobuharu

    1979-01-01

    A remotely controlled afterloading device for high dose rate intracavitary radiation, the remote afterloader Shimadzu Ralstron MTSW-20, was installed at Chiba Cancer Center Hospital in 1973 and put into clinical use for the treatment of carcinoma of the uterine cervix. Before the clinical use, isodose distributions and treatment schedules were investigated, compared with the low dose rate intracavitary radiation by linear sources of 137 Cs used hitherto. The isodose distributions, calculated by using an electronic computer, for various combinations of the length of uterine canal and the separation of vaginal applicators, were the same as those obtained with linear sources. As for the treatment schedules, by using PT (partial tolerance) which was derived from NSD concept of Ellis, a number of fractional radiation regimes with high dose rate, equivalent to continuous low dose rate radiation, was calculated. From these, a dose of 600 rad per fraction to point A every week has been chosen as the standard radiation schedule. The number of fractions has been varied with the clinical stages. Furthermore, some changes of total dose or small modification of dose distribution have been made for individual lesions. According to the preliminary results, three-year cumulative survival rate was 68.7% and complication rate was 15.2%. Comparing these results with those of the treatment at low dose rate, the former is nearly equal, while the latter is lower. The reduction of complication rate is probably due to the improvement of therapeutic techniques such as continuous observation by fractionated intracavitary radiation, variety of isodose distributions and accuracy of source placement by a short treatment time. (author)

  14. Duration of protection against hepatitis A for the current two-dose vaccine compared to a three-dose vaccine schedule in children

    Science.gov (United States)

    Raczniak, Gregory A.; Thomas, Timothy K.; Bulkow, Lisa R.; Negus, Susan E.; Zanis, Carolyn L.; Bruce, Michael G.; Spradling, Philip R.; Teshale, Eyasu H.; McMahon, Brian J.

    2015-01-01

    Background Hepatitis A is mostly a self-limiting disease but causes substantial economic burden. Consequently, United States Advisory Committee for Immunization Practices recommends inactivated hepatitis A vaccination for all children beginning at age 1 year and for high risk adults. The hepatitis A vaccine is highly effective but the duration of protection is unknown. Methods We examined the proportion of children with protective hepatitis A antibody levels (anti-HAV ≥20 mIU/mL) as well as the geometric mean concentration (GMC) of anti-HAV in a cross sectional convenience sample of individuals aged 12–24 years, who had been vaccinated with a two-dose schedule in childhood, with the initial dose at least 5 years ago. We compared a subset of data from persons vaccinated with two-doses (720 EL.U.) at age 3–6 years with a demographically similar prospective cohort that received a three-dose (360 EL.U.) schedule and have been followed for 17 years. Results No significant differences were observed when comparing GMC between the two cohorts at 10 (P = 0.467), 12 (P = 0.496), and 14 (P = 0.175) years post-immunization. For the three-dose cohort, protective antibody levels remain for 17 years and have leveled-off over the past 7 years. Conclusion The two- and three-dose schedules provide similar protection >14 years after vaccination, indicating a booster dose is not needed at this time. Plateauing anti-HAV GMC levels suggest protective antibody levels may persist long-term. PMID:23470239

  15. Dosage and dose schedule screening of drug combinations in agent-based models reveals hidden synergies

    Directory of Open Access Journals (Sweden)

    Lisa Corina Barros de Andrade e Sousa1

    2016-01-01

    Full Text Available The fungus Candida albicans is the most common causative agent of human fungal infections and better drugs or drug combination strategies are urgently needed. Here, we present an agent-based model of the interplay of C. albicans with the host immune system and with the microflora of the host. We took into account the morphological change of C. albicans from the yeast to hyphae form and its dynamics during infection. The model allowed us to follow the dynamics of fungal growth and morphology, of the immune cells and of microflora in different perturbing situations. We specifically focused on the consequences of microflora reduction following antibiotic treatment. Using the agent-based model, different drug types have been tested for their effectiveness, namely drugs that inhibit cell division and drugs that constrain the yeast-to-hyphae transition. Applied individually, the division drug turned out to successfully decrease hyphae while the transition drug leads to a burst in hyphae after the end of the treatment. To evaluate the effect of different drug combinations, doses, and schedules, we introduced a measure for the return to a healthy state, the infection score. Using this measure, we found that the addition of a transition drug to a division drug treatment can improve the treatment reliability while minimizing treatment duration and drug dosage. In this work we present a theoretical study. Although our model has not been calibrated to quantitative experimental data, the technique of computationally identifying synergistic treatment combinations in an agent based model exemplifies the importance of computational techniques in translational research.

  16. Early Mucosal Reactions During and After Head-and-Neck Radiotherapy: Dependence of Treatment Tolerance on Radiation Dose and Schedule Duration

    International Nuclear Information System (INIS)

    Fenwick, John D.; Lawrence, Geoff P.; Malik, Zafar; Nahum, Alan E.; Mayles, W. Philip M.

    2008-01-01

    Purpose: To more precisely localize the dose-time boundary between head-and-neck radiotherapy schedules inducing tolerable and intolerable early mucosal reactions. Methods and Materials: Total cell-kill biologically effective doses (BED CK ) have been calculated for 84 schedules, including incomplete repair effects, but making no other corrections for the effect of schedule duration T. [BED CK ,T] scatterplots are graphed, overlying BED CKboundary (T) curves on the plots and using discriminant analysis to optimize BED CKboundary (T) to best represent the boundary between the tolerable and intolerable schedules. Results: More overlap than expected is seen between the tolerable and intolerable treatments in the 84-schedule [BED CK ,T] scatterplot, but this was largely eliminated by removing gap and tolerated accelerating schedules from the plot. For the remaining 57 predominantly regular schedules, the BED CKboundary (T) boundary increases with increasing T (p = 0.0001), curving upwards significantly nonlinearly (p = 0.00007) and continuing to curve beyond 15 days (p = 0.035). The regular schedule BED CKboundary (T) boundary does not describe tolerability well for accelerating schedules (p = 0.002), with several tolerated accelerating schedules lying above the boundary where regular schedules would be intolerable. Gap schedule tolerability also is not adequately described by the regular schedule boundary (p = 0.04), although no systematic offset exists between the regular boundary and the overall gap schedule tolerability pattern. Conclusions: All schedules analyzed (regular, gap, and accelerating) with BED CK values below BED CKboundary (T)=69.5x(T/32.2)/sin((T/32.2) (radians) )-3.5Gy 10 (forT≤50 days) are tolerable, and many lying above the boundary are intolerable. The accelerating schedules analyzed were tolerated better overall than are the regular schedules with similar [BED CK ,T] values.

  17. Prognostic relevance of sunitinib toxicities and comparison of continuous vs. intermittent sunitinib dosing schedule in metastatic renal cell cancer patients

    Directory of Open Access Journals (Sweden)

    Çetin Ordu

    2016-06-01

    Full Text Available Aim of the study : Sunitinib-related side effects may develop as a result of the pharmacokinetic pathway affects the of the drug. Material and methods : Data on mRCC patients were obtained from the hospital archives. Outcomes of patients were evaluated in terms of related prognostic factors, sunitinib adverse events during the treatment, and two different sunitinib dosing schedules. Results : Seventy patients diagnosed with mRCC and treated with sunitinib were analyzed for prognostic factors and survival rates. During the mean follow-up of 33.5 months, 38 (54% patients were alive and 32 (46% patients died. The median time of overall survival (OS and progression-free survival (PFS was 27 months (12–61 and 19 months (5–45, respectively. In univariate analysis, good prognostic risk group according to the Memorial Sloan-Kettering Cancer Center (MSKCC, hypothyroidism as sunitinib toxicity and patients on sunitinib treatment more than 1 year were favorable prognostic factors for OS. Leukopenia and fatigue as sunitinib toxicity were poor prognostic factors for OS. PFS and OS of the patients were not significantly different when we compared intermittent (4/2 vs. continuous treatment dosing schedules. Conclusions : As a result of this trial, having hypothyroidism as an adverse effect of sunitinib was a favorable prognostic factor for OS and PFS in mRCC patients. It was also found that 4/2 and continuous dosing schedules of sunitinib did not give rise to different outcomes in mRCC patients.

  18. Systematic literature review comparing rapid 3-dose administration of the GSK tick-borne encephalitis vaccine with other primary immunization schedules.

    Science.gov (United States)

    Galgani, Ilaria; Bunge, Eveline M; Hendriks, Lisa; Schludermann, Christopher; Marano, Cinzia; De Moerlooze, Laurence

    2017-09-01

    Tick-borne encephalitis (TBE), which is endemic across large regions of Europe and Asia, is most effectively prevented through vaccination. Three-dose primary TBE vaccination schedules are either rapid (0,7,21-days) or conventional (0,28-84-days, 9-12-months). The second dose can also be administered at 14 days for faster priming and sero-protection). Areas covered: We used a three-step selection process to identify 21 publications comparing the immunogenicity and/or safety of different schedules. Expert commentary: Priming with two or three TBE vaccine doses was highly immunogenic. After conventional priming (0-28 days), 95% adults and ≥95% children had neutralization test (NT) titers ≥10 at 14 days post-dose-2 compared with 92% adults and 99% children at 21 days post-dose-3 (rapid schedule). Most subjects retained NT titers ≥10 at day 300. A single booster dose induced a strong immune response in all subjects irrespective of primary vaccination schedule or elapsed time since priming. GMT peaked at 42 days post-dose-1 (i.e., 21 days post-dose 3 [rapid-schedule], or 14-28 days post-dose-2 [conventional-schedule]), and declined thereafter. Adverse events were generally rare and declined with increasing doses. In the absence of data to recommend one particular schedule, the regimen choice will remain at the physician's discretion, based on patient constraints and availability.

  19. Optimizing the dosing schedule of l-asparaginase improves its anti-tumor activity in breast tumor-bearing mice

    Directory of Open Access Journals (Sweden)

    Shoya Shiromizu

    2018-04-01

    Full Text Available Proliferation of acute lymphoblastic leukemic cells is nutritionally dependent on the external supply of asparagine. l-asparaginase, an enzyme hydrolyzing l-asparagine in blood, is used for treatment of acute lymphoblastic leukemic and other related blood cancers. Although previous studies demonstrated that l-asparaginase suppresses the proliferation of cultured solid tumor cells, it remains unclear whether this enzyme prevents the growth of solid tumors in vivo. In this study, we demonstrated the importance of optimizing dosing schedules for the anti-tumor activity of l-asparaginase in 4T1 breast tumor-bearing mice. Cultures of several types of murine solid tumor cells were dependent on the external supply of asparagine. Among them, we selected murine 4T1 breast cancer cells and implanted them into BALB/c female mice kept under standardized light/dark cycle conditions. The growth of 4T1 tumor cells implanted in mice was significantly suppressed by intravenous administration of l-asparaginase during the light phase, whereas its administration during the dark phase failed to show significant anti-tumor activity. Decreases in plasma asparagine levels due to the administration of l-asparaginase were closely related to the dosing time-dependency of its anti-tumor effects. These results suggest that the anti-tumor efficacy of l-asparaginase in breast tumor-bearing mice is improved by optimizing the dosing schedule. Keywords: l-asparaginase, Asparagine, Solid tumor, Chrono-pharmacotherapy

  20. Optimizing the dosing schedule of l-asparaginase improves its anti-tumor activity in breast tumor-bearing mice.

    Science.gov (United States)

    Shiromizu, Shoya; Kusunose, Naoki; Matsunaga, Naoya; Koyanagi, Satoru; Ohdo, Shigehiro

    2018-04-01

    Proliferation of acute lymphoblastic leukemic cells is nutritionally dependent on the external supply of asparagine. l-asparaginase, an enzyme hydrolyzing l-asparagine in blood, is used for treatment of acute lymphoblastic leukemic and other related blood cancers. Although previous studies demonstrated that l-asparaginase suppresses the proliferation of cultured solid tumor cells, it remains unclear whether this enzyme prevents the growth of solid tumors in vivo. In this study, we demonstrated the importance of optimizing dosing schedules for the anti-tumor activity of l-asparaginase in 4T1 breast tumor-bearing mice. Cultures of several types of murine solid tumor cells were dependent on the external supply of asparagine. Among them, we selected murine 4T1 breast cancer cells and implanted them into BALB/c female mice kept under standardized light/dark cycle conditions. The growth of 4T1 tumor cells implanted in mice was significantly suppressed by intravenous administration of l-asparaginase during the light phase, whereas its administration during the dark phase failed to show significant anti-tumor activity. Decreases in plasma asparagine levels due to the administration of l-asparaginase were closely related to the dosing time-dependency of its anti-tumor effects. These results suggest that the anti-tumor efficacy of l-asparaginase in breast tumor-bearing mice is improved by optimizing the dosing schedule. Copyright © 2018 The Authors. Production and hosting by Elsevier B.V. All rights reserved.

  1. Outcomes Associated With 3 Treatment Schedules of High-Dose-Rate Brachytherapy Monotherapy for Favorable-Risk Prostate Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Jawad, Maha Saada; Dilworth, Joshua T.; Gustafson, Gary S.; Ye, Hong; Wallace, Michelle [Department of Radiation Oncology, Oakland University William Beaumont School of Medicine, Royal Oak, Michigan (United States); Martinez, Alvaro [Michigan HealthCare Professionals/21" s" t Century Oncology, Farmington Hills, Michigan (United States); Chen, Peter Y. [Department of Radiation Oncology, Oakland University William Beaumont School of Medicine, Royal Oak, Michigan (United States); Krauss, Daniel J., E-mail: DKrauss@beaumont.edu [Department of Radiation Oncology, Oakland University William Beaumont School of Medicine, Royal Oak, Michigan (United States)

    2016-03-15

    Purpose: We report the outcomes associated with 3 high-dose-rate (HDR) brachytherapy regimens used as monotherapy for favorable-risk prostate cancer. Methods and Materials: Four hundred ninety-four patients with stage ≤T2b prostate cancer, Gleason score ≤7, and prostate-specific antigen levels ≤15 ng/mL underwent HDR brachytherapy as monotherapy. Of those, 319 received 38 Gy in 4 fractions, 79 received 24 Gy in 2 fractions, and 96 received 27 Gy in 2 fractions. Acute and chronic genitourinary (GU) and gastrointestinal (GI) toxicities were defined as side effects occurring ≤6 and >6 months, respectively, after radiation therapy (RT) and were graded according to the Common Terminology Criteria for Adverse Events version 3.0. The time to toxicity was calculated from the date of RT completion. Variables were analyzed with χ{sup 2} test. P values <.05 were considered significant. Results: The median overall follow-up time was 4 years (range, 5.5, 3.5, and 2.5 years for 38 Gy, 24 Gy, and 27 Gy, respectively, P<.001). Acute and chronic grade ≥2 GU and GI toxicity profiles were similar among groups. Acceptable rates of grade 2 GU toxicities were seen with overall acute/chronic frequency/urgency, dysuria, retention, incontinence, and hematuria rates of 14%/20%, 6%/7%, 7%/4%, 1.5%/2%, and 1.5%/7%, respectively. Minimal grade 3 and no grade 4 or 5 toxicities were seen. Grade 1, 2, and 3 chronic urethral stricture rates were 0.3%, 2%, and 1%, respectively. All GI toxicities were similar between groups, with overall rates of acute/chronic grade 2 diarrhea, rectal pain/tenesmus, rectal bleeding, and proctitis of 1%/1%, <1%/0.5%, 0%/2%, and <1%/1%, respectively. No grade 3, 4, or 5 toxicities were seen. All comparisons were similar for hormone-naïve patients. The median time to maximal GU/GI toxicity was similar between groups, ranging from 1 to 1.6 to 0.9 to 1.2 years, respectively. There were no differences in clinical outcomes between the 3 groups at 5

  2. A comparative study of itraconazole in various dose schedules in the treatment of pulmonary aspergilloma in treated patients of pulmonary tuberculosis

    Directory of Open Access Journals (Sweden)

    Prahlad Rai Gupta

    2015-01-01

    Full Text Available Introduction: The optimal dose, duration, and efficacy of itraconazole in Indian patients of pulmonary aspergilloma (PA are not clearly defined. Therefore, a study was carried out, to resolve these issues in diagnosed cases of PA complicating old treated patients of pulmonary tuberculosis. Materials and Methods: The study patients randomly received itraconazole either in a fixed dose schedule of 200 mg (group I, 200 mg twice daily (group II or a variable dose schedule (group III, for 12 months. All the patients were followed up for the entire duration of the study for clinical, radiological, and immunological response. The side effects were recorded as and when reported by the patients and managed symptomatically. Results: A total of 60 patients were enrolled, 20, in each group. There were no intergroup differences with regard to age, sex, body weight, smoking status, alcohol intake, symptoms, Potassium hydroxide (KOH mount, fungal culture, pattern of radiological lesions or anti-aspergillus antibodies (anti-Asp-Ab titers. The radiological response was poor in group I patients, as compared to the other groups, at two months (P < 0.05. The dose of itraconazole was increased in five of the patients in group I due to poor response. A higher number of group II patients suffered side effects and the dose of itraconazole had to be decreased in three of these patients, but none of the patients on a variable dose schedule required a change in dose schedule. Conclusion: Thus, a weight-based variable dose schedule of itraconazole was found to be a more effective and safer modality in the management of PA than a fixed dose schedule.

  3. Toxicity Profile and Pharmacokinetic Study of A Phase I Low-Dose Schedule-Dependent Radiosensitizing Paclitaxel Chemoradiation Regimen for Inoperable Non-Small-Cell Lung Cancer

    International Nuclear Information System (INIS)

    Chen, Yuhchyau; Pandya, Kishan J.; Feins, Richard; Johnstone, David W.; Watson, Thomas; Smudzin, Therese; Keng, Peter C.

    2008-01-01

    Purpose: We report the toxicity profile and pharmacokinetic data of a schedule-dependent chemoradiation regimen using pulsed low-dose paclitaxel for radiosensitization in a Phase I study for inoperable non-small-cell lung cancer. Methods and Materials: Paclitaxel at escalating doses of 15 mg/m 2 , 20 mg/m 2 , and 25 mg/m 2 were infused on Monday, Wednesday, and Friday with daily chest radiation in cohorts of 6 patients. Daily radiation was delayed for maximal G2/M arrest and apoptotic effect, an observation from preclinical investigations. Plasma paclitaxel concentration was determined by high-performance liquid chromatography. Results: Dose-limiting toxicities included 3 of 18 patients with Grade 3 pneumonitis and 3 of 18 patients with Grade 3 esophagitis. There was no Grade 4 or 5 pneumonitis or esophagitis. There was also no Grade 3 or 4 neutropenia, thrombocytopenia, anemia or neuropathy. For Dose Levels I (15 mg/m 2 ), II (20 mg/m 2 ), and III (25 mg/m 2 ), the mean peak plasma level was 0.23 ± 0.06 μmol/l, 0.32 ± 0.05 μmol/l, and 0.52 ± 0.14 μmol/l, respectively; AUC was 0.44 ± 0.09 μmol/l, 0.61 ± 0.1 μmol/l, and 0.96 ± 0.23 μmol/l, respectively; and duration of drug concentration >0.05 μmol/l (t > 0.05 μmol/l) was 1.6 ± 0.3 h, 1.9 ± 0.2 h, and 3.0 ± 0.9 h, respectively. Conclusion: Pulsed low-dose paclitaxel chemoradiation is associated with low toxicity. Pharmacokinetic data showed that plasma paclitaxel concentration >0.05 μmol/l for a minimum of 1.6 h was sufficient for effective radiosensitization

  4. Comparison of dose-responses of contact allergens using the guinea pig maximization test and the local lymph node assay

    NARCIS (Netherlands)

    Och, F.M.M. van; Vandebriel, R.J.; Prinsen, M.K.; Jong, W.H. de; Slob, W.; Loveren, H. van

    2001-01-01

    The guinea pig maximization test (GPMT) has been used as a method for the prediction of skin sensitizing potential for over 30 years. Besides hazard identification, risk assessment of sensitizing chemicals requires the assessment of potency. For the determination of potency based on lowest effective

  5. The impact of central lung distance, maximal heart distance, and radiation technique on the volumetric dose of the lung and heart for intact breast radiation

    International Nuclear Information System (INIS)

    Kong, F.-M.; Klein, Eric E.; Bradley, Jeffrey D.; Mansur, David B.; Taylor, Marie E.; Perez, Carlos A.; Myerson, Robert J.; Harms, William B.

    2002-01-01

    Purpose: To investigate the impact of radiographic parameter and radiation technique on the volumetric dose of lung and heart for intact breast radiation. Methods and Materials: Forty patients with both two-dimensional (2D) and computed tomographic (CT) simulations were enrolled in the study. Central lung distance (CLD), maximal heart distance (MHD), and maximal heart length (MHL) were measured under virtual simulation. Four plans were compared for each patient. Plan A used a traditional 2D tangential setup. Plan B used clinical target volume (CTV) based three-dimensional (3D) planning. Both plans C and D used a combination of a medial breast field with shallow tangents. Plan D is a further modification of plan C. Results: Under the traditional tangential setup, the mean ipsilateral lung dose and volume at 20, 30, and 40 Gy correlated linearly with CLD (R = 0.85∼0.91). The mean ipsilateral lung dose (Gy) approximated 4 times the CLD value (cm), whereas the percentage volume (%) of ipsilateral lung at 20, 30, and 40 Gy was about 10 times the CLD (cm). The mean heart dose and percentage volume at 20, 30, and 40 Gy correlated with MHD (R = 0.76∼0.80) and MHL (R 0.65∼0.75). The mean heart dose (Gy) approximated 3 times the MHD value (cm), and the percentage volume (%) of the heart at 10, 20, 30, and 40 Gy was about 6 times MHD (cm). Radiation technique impacted lung and heart dose. The 3D tangential plan (plan B) failed to reduce the volumetric dose of lung and heart from that of the 2D plan (plan A). The medial breast techniques (plans C and D) significantly decreased the volume of lung and heart receiving high doses (30 and 40 Gy). Plan D further decreased the 20 Gy volumes. By use of the medial breast technique, the lung and heart dose were not impacted by original CLD and MHD/MHL. Therefore, the improvement from the tangential technique was more remarkable for patients with CLD ≥ 3.0 cm (p<0.001). Conclusions: The CLD and MHD impact the volumetric dose of

  6. Medium-dose-rate brachytherapy of cancer of the cervix: preliminary results of a prospectively designed schedule based on the linear-quadratic model

    International Nuclear Information System (INIS)

    Leborgne, Felix; Fowler, Jack F.; Leborgne, Jose H.; Zubizarreta, Eduardo; Curochquin, Rene

    1999-01-01

    Purpose: To compare results and complications of our previous low-dose-rate (LDR) brachytherapy schedule for early-stage cancer of the cervix, with a prospectively designed medium-dose-rate (MDR) schedule, based on the linear-quadratic model (LQ). Methods and Materials: A combination of brachytherapy, external beam pelvic and parametrial irradiation was used in 102 consecutive Stage Ib-IIb LDR treated patients (1986-1990) and 42 equally staged MDR treated patients (1994-1996). The planned MDR schedule consisted of three insertions on three treatment days with six 8-Gy brachytherapy fractions to Point A, two on each treatment day with an interfraction interval of 6 hours, plus 18 Gy external whole pelvic dose, and followed by additional parametrial irradiation. The calculated biologically effective dose (BED) for tumor was 90 Gy 10 and for rectum below 125 Gy 3 . Results: In practice the MDR brachytherapy schedule achieved a tumor BED of 86 Gy 10 and a rectal BED of 101 Gy 3 . The latter was better than originally planned due to a reduction from 85% to 77% in the percentage of the mean dose to the rectum in relation to Point A. The mean overall treatment time was 10 days shorter for MDR in comparison with LDR. The 3-year actuarial central control for LDR and MDR was 97% and 98% (p = NS), respectively. The Grades 2 and 3 late complications (scale 0 to 3) were 1% and 2.4%, respectively for LDR (3-year) and MDR (2-year). Conclusions: LQ is a reliable tool for designing new schedules with altered fractionation and dose rates. The MDR schedule has proven to be an equivalent treatment schedule compared with LDR, with an additional advantage of having a shorter overall treatment time. The mean rectal BED Gy 3 was lower than expected

  7. Low-dose X-irradiation of adjuvant-induced arthritis in rats. Efficacy of different fractionation schedules

    International Nuclear Information System (INIS)

    Liebmann, A.; Hindemith, M.; Jahns, J.; Kamprad, F.; Hildebrandt, G.; Madaj-Sterba, P.; Weisheit, S.

    2004-01-01

    Background and purpose: low-dose radiotherapy is widely accepted as a very effective treatment option for inflammatory symptoms associated with painful degenerative joint disorders. Radiation doses and fractionation schedules in practical use are empirical and mainly based on clinical observations. Experimental data are rare. The efficacy of low-dose X-irradiation on adjuvant induced arthritis in rats using different fractionation schemes was investigated in vivo, in order to explore whether there is a dose and fractionation dependence. Material and methods: adjuvant arthritis in female lewis rats (n = 128) was induced by intradermal injection of heat-inactivated Mycobacterium tuberculosis on day 0. Both arthritic hind paws were sham-irradiated (group 1: days 10-14; group 2: days 15-19; group 3: days 22-26) or X-irradiated with either 5 x 1.0 Gy (group 4: days 10-14; group 6: days 15-19; group 8: days 22-26; group 10: days 10, 12, 14, 16, and 18) or 5 x 0.5 Gy (group 5: days 10-14; group 7: days 15-19; group 9: days 22-26; group 11: days 10, 12, 14, 16, and 18; group 12: days 10-14 and 22-26). The clinical parameters arthritis score (AS), hind paw volume (HPV), and body weight were determined. Results: a significant decrease of the clinical arthritis parameters was observed following 5 x 0.5 Gy or 5 x 1.0 Gy during the acute maximum of the inflammatory response (days 15-19). The most pronounced treatment effect was reached after two daily fractionated series of 5 x 0.5 Gy with an early treatment onset (days 10-14) and repetition in interval (days 22-26). After the application of 5 x 1.0 Gy on days 10-14 or in a protracted scheme (days 10, 12, 14, 16, and 18), only a nonsignificant positive trend could be detected. Daily fractionated X-irradiation in the chronic phase of adjuvant arthritis (days 22-26) did not show any positive clinical effect. Conclusion: low-dose radiotherapy is able to prevent a full-blown arthritic reaction if given during the florid phase of

  8. Assessment of mumps-containing vaccine effectiveness during an outbreak: Importance to introduce the 2-dose schedule for China.

    Science.gov (United States)

    Ma, Chao; Liu, Yan; Tang, Jihai; Jia, Haimei; Qin, Wei; Su, Ying; Wang, Huaqing; Hao, Lixin

    2018-01-29

    China has used 3 different mumps-containing vaccines (MuCV) since 1990: monovalent mumps vaccine, measles-mumps (MM) vaccine, and measles-mumps-rubella (MMR) vaccine, and one dose MuCV (using MMR at 18 months) has been included in the EPI since 2007. MuCV effectiveness has been of concern following large-scale mumps outbreaks. In 2015, an outbreak of mumps occurred in a primary school, which allow us assess vaccine effectiveness of different MuCVs. All children in the school were studied as a retrospective cohort. Vaccination histories and case information were obtained from vaccination records and clinic/hospital logs. Parental questionnaires were used to confirm students' illnesses and calculate attack rate (AR). VE was assessed using the formula, VE = (AR in unvaccinated students- AR in the vaccinated students) / (AR in unvaccinated students). VEs of different type of MuCV were compared. In total, 283 students were identified as clinical mumps among the 2370 students, and 1908 students were included for MuCV VE assessment. 213 (including 21 [8.9%] patients) were 2-dose MuCV recipients (AR: 9.9%), 1165 (including 123 [51.9%] patients) were 1-dose recipients (AR: 10.6%), and 530 (including 93 [39.2%] patients) were unvaccinated (AR: 17.5%). VE was 44% for 2 doses and 40% for one dose. For one-MuCV-dose students, estimated mumps VE was 63% for vaccinated within 3 years (between vaccination and this outbreak); 50% for vaccinated within 3 to 5 years; and 34% for vaccinated more than 5 years. Comparing VE by vaccine type and 5-year interval since vaccination, VE for MMR was 60%, which was consistently higher than VE for monovalent mumps vaccine (22%) and MM (2%). This outbreak was associated with low and declining 1-dose MuCV effectiveness. China's immunization program should evaluate the potential of a 2-dose MMR schedule to adequately control mumps.

  9. Intravenous infusion of docosahexaenoic acid increases serum concentrations in a dose-dependent manner and increases seizure latency in the maximal PTZ model.

    Science.gov (United States)

    Trépanier, Marc-Olivier; Kwong, Kei-Man; Domenichiello, Anthony F; Chen, Chuck T; Bazinet, Richard P; Burnham, W M

    2015-09-01

    Docosahexaenoic acid (DHA) is an omega-3 polyunsaturated fatty acid (n-3 PUFA) that has been shown to raise seizure thresholds in the maximal pentylenetetrazole model following acute subcutaneous (s.c.) administration in rats. Following s.c. administration, however, the dose-response relationship for DHA has shown an inverted U-pattern. The purposes of the present experiment were as follows: (1) to determine the pattern of serum unesterified concentrations resulting from the intravenous (i.v.) infusions of various doses of DHA, (2) to determine the time course of these concentrations following the discontinuation of the infusions, and (3) to determine whether seizure protection in the maximal PTZ model would correlate with serum unesterified DHA levels. Animals received 5-minute i.v. infusions of saline or 25, 50, 100, or 200mg/kg of DHA via a cannula inserted into one of the tail veins. Blood was collected during and after the infusions by means of a second cannula inserted into the other tail vein (Experiment 1). A separate group of animals received saline or 12.5-, 25-, 50-, 100-, or 200 mg/kg DHA i.v. via a cannula inserted into one of the tail veins and were then seizure-tested in the maximal PTZ model either during infusion or after the discontinuation of the infusions. Slow infusions of DHA increased serum unesterified DHA concentrations in a dose-dependent manner, with the 200-mg/kg dose increasing the concentration approximately 260-fold compared with saline-infused animals. Following discontinuation of the infusions, serum concentrations rapidly dropped toward baseline, with half-lives of approximately 40 and 11s for the 25-mg/kg dose and 100-mg/kg dose, respectively. In the seizure-tested animals, DHA significantly increased latency to seizure onset in a dose-dependent manner. Following the discontinuation of infusion, seizure latency rapidly decreased toward baseline. Overall, our study suggests that i.v. infusion of unesterified DHA results in

  10. Effect of reduced dose schedules and intramuscular injection of anthrax vaccine adsorbed on immunological response and safety profile: a randomized trial.

    Science.gov (United States)

    Wright, Jennifer G; Plikaytis, Brian D; Rose, Charles E; Parker, Scott D; Babcock, Janiine; Keitel, Wendy; El Sahly, Hana; Poland, Gregory A; Jacobson, Robert M; Keyserling, Harry L; Semenova, Vera A; Li, Han; Schiffer, Jarad; Dababneh, Hanan; Martin, Sandra K; Martin, Stacey W; Marano, Nina; Messonnier, Nancy E; Quinn, Conrad P

    2014-02-12

    We evaluated an alternative administration route, reduced schedule priming series, and increased intervals between booster doses for anthrax vaccine adsorbed (AVA). AVA's originally licensed schedule was 6 subcutaneous (SQ) priming injections administered at months (m) 0, 0.5, 1, 6, 12 and 18 with annual boosters; a simpler schedule is desired. Through a multicenter randomized, double blind, non-inferiority Phase IV human clinical trial, the originally licensed schedule was compared to four alternative and two placebo schedules. 8-SQ group participants received 6 SQ injections with m30 and m42 "annual" boosters; participants in the 8-IM group received intramuscular (IM) injections according to the same schedule. Reduced schedule groups (7-IM, 5-IM, 4-IM) received IM injections at m0, m1, m6; at least one of the m0.5, m12, m18, m30 vaccine doses were replaced with saline. All reduced schedule groups received a m42 booster. Post-injection blood draws were taken two to four weeks following injection. Non-inferiority of the alternative schedules was compared to the 8-SQ group at m2, m7, and m43. Reactogenicity outcomes were proportions of injection site and systemic adverse events (AEs). The 8-IM group's m2 response was non-inferior to the 8-SQ group for the three primary endpoints of anti-protective antigen IgG geometric mean concentration (GMC), geometric mean titer, and proportion of responders with a 4-fold rise in titer. At m7 anti-PA IgG GMCs for the three reduced dosage groups were non-inferior to the 8-SQ group GMCs. At m43, 8-IM, 5-IM, and 4-IM group GMCs were superior to the 8-SQ group. Solicited injection site AEs occurred at lower proportions in the IM group compared to SQ. Route of administration did not influence the occurrence of systemic AEs. A 3 dose IM priming schedule with doses administered at m0, m1, and m6 elicited long term immunological responses and robust immunological memory that was efficiently stimulated by a single booster vaccination at

  11. Anti-CD20 Cell Therapies in Multiple Sclerosis—A Fixed Dosing Schedule for Ocrelizumab is Overkill

    Directory of Open Access Journals (Sweden)

    Jagannadha Avasarala

    2017-10-01

    Full Text Available Anti-CD 20 therapies have found significant uses in multiple sclerosis (MS. Based singularly on the accumulated evidence with the use of rituximab (RTX; Rituxan, Genentech, and Biogen in neuroimmunological diseases, ocrelizumab (OCR; Ocrevus, Genentech was developed as a treatment option for MS and selectively targets CD20 B cells, a cell surface antigen found on pre-B cells, mature, and memory B cells, but not on lymphoid stem cells and plasma cells. On the basis of indirect evidence, elimination of the antigen-presenting capabilities and antigen nonspecific immune functions of B cells appear to be central to the therapeutic efficacy of anti-CD20 B-cell therapies. An important question is this—Why does the drug need to be dosed at fixed intervals and not based on a measurable endpoint, such as tracking peripheral CD20 cell counts? There is minimal scientific validity in infusing the drug every 6 months particularly if CD20 cell counts are negligible in the peripheral blood. In this analysis, a case is made for following CD19 cell populations as a surrogate for CD20 cells on a monthly basis to guide OCR redosing parameters and does not follow a scheduled dosing parameter.

  12. Postoperative irradiation for the prevention of heterotopic bone: Analysis of different dose schedules and shielding considerations

    International Nuclear Information System (INIS)

    Blount, L.H.; Thomas, B.J.; Tran, L.; Selch, M.T.; Sylvester, J.E.; Parker, R.G.

    1990-01-01

    Ninety-seven high risk hips were irradiated postoperatively for prevention of heterotopic bone (HTB) in the UCLA Department of Radiation Oncology from 1980 to 1988. Ninety-two hips in 82 patients were eligible for analysis with a minimum follow-up of 2 months and a median follow-up of 10 months. Forty-nine of the hips had porous coated ingrowth prostheses. From 1980 to 1986, 2 Gy fractions were used to deliver 20 Gy (8 hips), 12 Gy (1 hip), and 10 Gy (27 hips). Since December of 1986, 38 hips received 8 Gy in two increments and 18 hips received a single 7 Gy fraction. All porous ingrowth components were shielded with custom blocks. Six out of 92 hips developed clinically significant. There was one clinically significant failure in 78 hips (1.3%) when irradiation was initiated before post-operative day (POD) No.6 and shielding was properly placed. One clinical failure occurred in 38 hips which received 8 Gy in two increments. One clinical failure occurred out of the 18 hips treated with 7 Gy in one fraction. This failure could be related to block malposition. There were four clinical failures in the 36 hips treated with 2 Gy fractions to total doses of 10 Gy, 12 Gy, or 20 Gy. Three of these failures were associated with initiation of treatment after POD No.5, and the fourth was related to block malposition. Unshielded trochanteric osteotomies resulted in five migrations and seven fibrous unions for a total non-osseous union rate of 12/36 (33%). Shielding of the remaining 28 trochanteric osteotomies resulted in a non-osseous union rate of 7%. There were no failures of union of components, and the only side effects noted in the series were the five trochanteric migrations. In conclusion, the use of 8 Gy in two increments or 7 Gy in one fraction was found to be as efficacious as conventional 2 Gy fractionation schemes with no increase in side effects

  13. A new dose of maximal-intensity interval training in hypoxia to improve body composition and hemoglobin and hematocrit levels: a pilot study.

    Science.gov (United States)

    Camacho-Cardenosa, Marta; Camacho-Cardenosa, Alba; Martínez Guardado, Ismael; Marcos-Serrano, Marta; Timon, Rafael; Olcina, Guillermo

    2017-01-01

    This pilot study had the aim to determine the effects of a new dose of maximal-intensity interval training in hypoxia in active adults. Twenty-four university student volunteers were randomly assigned to three groups: hypoxia group, normoxia group or control group. The eight training sessions consisted of 2 sets of 5 repeated sprints of 10 seconds with a recovery of 20 seconds between sprints and a recovery period of 10 minutes between sets. Body composition was measured following standard procedures. A blood sample was taken for an immediate hematocrit (HCT) and hemoglobin (Hb) concentration assessment. An all-out 3-ute test was performed to evaluate ventilation parameters and power. HCT and Hb were significantly higher for the hypoxia group in Post- and Det- (P=0.01; P=0.03). Fat mass percentage was significantly lower for the hypoxia group in both assessments (P=0.05; P=0.05). The hypoxia group underwent a significant increase in mean power after the recovery period. A new dose of 8 sessions of maximal-intensity interval training in hypoxia is enough to decrease the percentage of fat mass and to improve HCT and Hb parameters and mean muscle power in healthy and active adults.

  14. Optimum radiotherapy schedule for uterine cervical cancer based-on the detailed information of dose fractionation and radiotherapy technique

    International Nuclear Information System (INIS)

    Cho, Jae Ho; Kim, Hyun Chang; Suh, Chang Ok

    2005-01-01

    The best dose-fractionation regimen of the definitive radiotherapy for cervix cancer remains to be clearly determined. It seems to be partially attributed to the complexity of the affecting factors and the lack of detailed information on external and intra-cavitary fractionation. To find optimal practice guidelines, our experiences of the combination of external beam radiotherapy (EBRT) and high-dose-rate intracavitary brachytherapy (HDR-ICBT) were reviewed with detailed information of the various treatment parameters obtained from a large cohort of women treated homogeneously at a single institute. The subjects were 743 cervical cancer patients (Stage IB 198, IIA 77, IIB 364, IIIA 7, IIIB 89 and IVA 8) treated by radiotherapy alone, between 1990 and 1996. A total external beam radiotherapy (EBRT) dose of 23.4 ∼ 59.4 Gy (Median 45.0) was delivered to the whole pelvis. High-dose-rate intracavitary brachytherapy (HDR-ICBT) was also performed using various fractionation schemes. A Midline block (MLB) was initiated after the delivery of 14.4∼ 43.2 Gy (Median 36.0) of EBRT in 495 patients, while in the other 248 patients EBRT could not be used due to slow tumor regression or the huge initial bulk of tumor. The point A, actual bladder and rectal doses were individually assessed in all patients. The biologically effective dose (BED) to the tumor (α / β = 10) and late-responding tissues (α /β = 3) for both EBRT and HDR-ICBT were calculated. The total BED values to point A, the actual bladder and rectal reference points were the summation of the EBRT and HDR-ICBT. In addition to all the details on dose-fractionation, the other factors (i.e. the overall treatment time, physicians preference) that can affect the schedule of the definitive radiotherapy were also thoroughly analyzed. The association between MD-BED Gy 3 and the risk of complication was assessed using serial multiple logistic regressions models. The associations between R-BED Gy 3 and rectal complications

  15. Optimal dose selection accounting for patient subpopulations in a randomized Phase II trial to maximize the success probability of a subsequent Phase III trial.

    Science.gov (United States)

    Takahashi, Fumihiro; Morita, Satoshi

    2018-02-08

    Phase II clinical trials are conducted to determine the optimal dose of the study drug for use in Phase III clinical trials while also balancing efficacy and safety. In conducting these trials, it may be important to consider subpopulations of patients grouped by background factors such as drug metabolism and kidney and liver function. Determining the optimal dose, as well as maximizing the effectiveness of the study drug by analyzing patient subpopulations, requires a complex decision-making process. In extreme cases, drug development has to be terminated due to inadequate efficacy or severe toxicity. Such a decision may be based on a particular subpopulation. We propose a Bayesian utility approach (BUART) to randomized Phase II clinical trials which uses a first-order bivariate normal dynamic linear model for efficacy and safety in order to determine the optimal dose and study population in a subsequent Phase III clinical trial. We carried out a simulation study under a wide range of clinical scenarios to evaluate the performance of the proposed method in comparison with a conventional method separately analyzing efficacy and safety in each patient population. The proposed method showed more favorable operating characteristics in determining the optimal population and dose.

  16. The effects of low and moderate doses of caffeine supplementation on upper and lower body maximal voluntary concentric and eccentric muscle force.

    Science.gov (United States)

    Tallis, Jason; Yavuz, Harley C M

    2018-03-01

    Despite the growing quantity of literature exploring the effect of caffeine on muscular strength, there is a dearth of data that directly explores differences in erogenicity between upper and lower body musculature and the dose-response effect. The present study sought to investigate the effects of low and moderate doses of caffeine on the maximal voluntary strength of the elbow flexors and knee extensors. Ten nonspecifically strength-trained, recreationally active participants (aged 21 ± 0.3 years) completed the study. Using a randomised, counterbalanced, and double-blind approach, isokinetic concentric and eccentric strength was measured at 60 and 180°/s following administration of a placebo, 3 mg·kg -1 body mass caffeine, and 6 mg·kg -1 body mass caffeine. There was no effect of caffeine on the maximal voluntary concentric and eccentric strength of the elbow flexors, or the eccentric strength of the knee extensors. Both 3 and 6 mg·kg -1 body mass caffeine caused a significant increase in peak concentric force of the knee extensors at 180°/s. No difference was apparent between the 2 concentrations. Only 6 mg·kg -1 body mass caused an increase in peak concentric force during repeated contractions. The results infer that the effective caffeine concentration to evoke improved muscle performance may be related to muscle mass and contraction type. The present work indicates that a relatively low dose of caffeine treatment may be effective for improving lower body muscular strength, but may have little benefit for the strength of major muscular groups of the upper body.

  17. Entropy maximization

    Indian Academy of Sciences (India)

    Abstract. It is shown that (i) every probability density is the unique maximizer of relative entropy in an appropriate class and (ii) in the class of all pdf f that satisfy. ∫ fhi dμ = λi for i = 1, 2,...,...k the maximizer of entropy is an f0 that is pro- portional to exp(. ∑ ci hi ) for some choice of ci . An extension of this to a continuum of.

  18. Entropy Maximization

    Indian Academy of Sciences (India)

    It is shown that (i) every probability density is the unique maximizer of relative entropy in an appropriate class and (ii) in the class of all pdf that satisfy ∫ f h i d = i for i = 1 , 2 , … , … k the maximizer of entropy is an f 0 that is proportional to exp ⁡ ( ∑ c i h i ) for some choice of c i . An extension of this to a continuum of ...

  19. Ultra-rapid high dose irradiation schedules for the palliation of brain metastases: final results of the first two studies by the radiation therapy oncology group

    International Nuclear Information System (INIS)

    Borgelt, B.; Gelber, R.; Larson, M.; Hendrickson, F.; Griffin, T.; Rother, R.

    1981-01-01

    Between January, 1971, and February, 1976, the Radiation Therapy Oncology Group entered 1902 evaluable patients into two sequential Phase III national cooperative trials to study the effectiveness of different time dose radiotherapy schemes on the palliation of patients with brain metastases. Each trial included an optional arm into which patients were randomized to receive 1000 rad/1 fraction (26 patients, First study) or 1200 rad/2 fractions (33 patients, Second study). Comparisons were made with 143 control patients randomized by the same participating institutions to receive a more protracted course of irradiation (2000, 3000 or 4000 rad/1-4wks). Response of patients receiving ultra-rapid treatment, as assessed by the percent who had improvement in neurologic function, was comparable to that of patients receiving the more protracted schedules. Promptness of neurologic function improvement, treatment morbidity and median survival were also comparable to those of patients receiving 2000 to 4000 rad. However, the duration of improvement, time to progression of neurologic status and rate of complete disappearance of neurologic symptoms were generally less for those patients who received 1000 or 1200 rad. These results suggest that ultra-rapid, high dose irradiation schedules may not be so effective as higher dose schedules in the palliation of patients with brain metastases

  20. Time-Dependent Kinetics of Tretinoin in Chronic Myelogenous Leukaemia during Intermittent Dose Scheduling: 1 Week On/1 Week Off.

    Science.gov (United States)

    Regazzi, M B; Russo, D; Iacona, I; Sacchi, S; Visani, G; Lazzarino, M; Avvisati, G; Pelicci, P G; Dastoli, G; Grandi, C; Spreafico, S; Grattoni, R; Galieni, P; Rupoli, S; Maiolo, A M; Guerra, E; Liberati, A M

    1998-01-01

    This study investigated the pharmacokinetics of tretinoin during alternating cycles of 1 week of tretinoin treatment and 1 week drug-free in patients with Ph1+ chronic myelogenous leukaemia (CML) in the chronic phase. Eighteen patients with CML were treated with tretinoin 80 mg/m(2)/day (in two divided doses) for 7 consecutive days every other week (one cycle = 1 week on/1 week off). Body systemic exposure to tretinoin as determined by the area under the plasma concentration-time curve (AUC) decreased significantly during the first week of drug administration, from (mean +/- SD) 678.3 +/- 498.1 to 258.7 +/- 272.4 microg/L.h. In about 40% of the patients the decline in plasma concentrations was >/=80%, while 17% of the population did not experience any decline. On day 7 of cycle 1, the mean apparent oral clearance (CL/F) was 2.6 times the corresponding value on day 1. After 1 week without tretinoin, the mean AUC on day 1 of cycle 2 was lower (down 15%) but not statistically different from the corresponding value observed on day 1 of cycle 1; 62% of patients showed an increase in the AUC, which was 40% higher than the corresponding value on day 7 of cycle 1. On day 1 of cycle 6, the AUC and CL/F of tretinoin during a dosage interval were not statistically different from those observed on day 1 of cycle 1 and cycle 2. On all occasions the peak plasma concentration (C(max)) was strongly correlated to the corresponding AUC. No significant change in the time to observed C(max) (t(max)) and in the elimination half-life (t((1/2))) was observed during the whole study. These results confirmed that the metabolism of tretinoin is rapidly up-regulated in CML patients, with significant declines in plasma drug exposure during the first week of drug administration. After tretinoin was discontinued, a return to the noninduced state followed a mean time-cycle similar to the induction. The strong decrease in the apparent oral drug clearance and the absence of significant variations

  1. Stage, tumor growth rate and optimal dose fractionation schedules in the treatment of squamous cell carcinoma of the head and neck

    International Nuclear Information System (INIS)

    Sugawara, Tadashi; Morita, Mamoru; Aihara, Toshinori; Tanaka, Osamu

    1983-01-01

    In 77 patients with cancer of the head and neck, 45 patients received radiotherapy alone, while 32 patients with T 1 or T 2 glottic cancer received combined therapy with laryngomicrosurgery performed prior to or during the course of irradiation. These T 1 and T 2 groups were separately analyzed from other T 1 and T 2 groups as T sub(LMS). Local recurrence rates were compared concerning overall time and fraction size in following three subgroups, i.e., T sub(LMS), Tsub(1+2), and Tsub(3+4). No significant correlation was detected between total dose converted to partial tolerance (PT) and local control in all subgroups except for Tsub(3+4), in which local recurrence rate was rather higher in high PT range. Local control was significantly dependent on overall treatment time and fraction size, differently by tumor stage. Favorable fractionation schedules considered as optimal for T sub(LMS) were those in which treatment was given 5 times weekly with a daily dose rate more than 196 rad in a shorter overall time of less than 42 days. In contrast to T sub(LMS), effective schedules for Tsub(3+4) consisted of longer overall time of more than 60 days and a lower daily dose rate of less than 153 rad. In Tsub(1+2), the optimal schedule was needed to be altered according to rapidness of progression of disease characterised by duration of the complaints, which was statistically proved to be significantly shorter in Tsub(1+2) than Tsub(3+4). Rapidity-adjusted schedule consisted of a shorter over-all time of less than 49 days with a daily dose rate of more than 175 rad 5 fractions a week for a case having a duration of complaints of less than 2.9 months, and a longer overall time of more than 50 days with a daily dose rate of less than 174 rad for a case having a duration of more than 3 months. (J.P.N.)

  2. Influence of titration schedule and maintenance dose on the tolerability of adjunctive eslicarbazepine acetate: An integrated analysis of three randomized placebo-controlled trials.

    Science.gov (United States)

    Krauss, Gregory; Biton, Victor; Harvey, Jay H; Elger, Christian; Trinka, Eugen; Soares da Silva, Patrício; Gama, Helena; Cheng, Hailong; Grinnell, Todd; Blum, David

    2018-01-01

    To examine the influence of titration schedule and maintenance dose on the incidence and type of treatment-emergent adverse events (TEAEs) associated with adjunctive eslicarbazepine acetate (ESL). Data from three randomized, double-blind, placebo-controlled trials were analyzed. Patients with refractory partial-onset seizures were randomized to maintenance doses of ESL 400, 800, or 1200mg QD (dosing was initiated at 400 or 800mg QD) or placebo. The incidence of TEAEs was analyzed during the double-blind period (2-week titration phase; 12-week maintenance phase), according to the randomized maintenance dose and the titration schedule. 1447 patients were included in the analysis. During the first week of treatment, 62% of patients taking ESL 800mg QD had ≥1 TEAE, vs 35% of those taking 400mg QD and 32% of the placebo group; dizziness, somnolence, nausea, and headache were numerically more frequent in patients taking ESL 800mg than those taking ESL 400mg QD. During the double-blind period, the incidences of common TEAEs were lower in patients who initiated ESL at 400mg vs 800mg QD. For the 800 and 1200mg QD maintenance doses, rates of TEAEs leading to discontinuation were lower in patients who began treatment with 400mg than in those who began taking ESL 800mg QD. Initiation of ESL at 800mg QD is feasible. However, initiating treatment with ESL 400mg QD for 1 or 2 weeks is recommended, being associated with a lower incidence of TEAEs, and related discontinuations. For some patients, treatment may be initiated at 800mg QD, if the need for more immediate seizure reduction outweighs concerns about increased risk of adverse reactions during initiation. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  3. Quantitative comparison of the results obtained by the multiple-dose guinea pig maximization test and the non-radioactive murine local lymph-node assay for various biocides.

    Science.gov (United States)

    Yamano, Tetsuo; Shimizu, Mitsuru; Noda, Tsutomu

    2005-07-01

    We compared the results of the multiple-dose guinea pig maximization test (GPMT) and the non-radioactive murine local lymph-node assay (LLNA) for various biocides. Thirteen out of 17 positive biocides in the GPMT gave positive results in the LLNA. In the GPMT, the minimum first induction doses ranged over four orders (0.00005-0.5%), while elicitation-threshold doses, which were evaluated using an optimally sensitized group of animals in the multiple-dose studies, ranged over five orders (0.00006-2.8%). In the LLNA, minimum induction doses ranged over more than three orders (0.01-30%). With respect to 13 biocides that were positive in both the GPMT and the LLNA, results were quantitatively compared. When compared after conversion to corresponding area doses (microg/cm), the minimum doses required to elicit skin reaction in guinea pigs were always lower than that for induction in mice with all biocides. Correlation between minimum induction doses from the GPMT and the LLNA seemed poor (r=0.57), while that between minimum induction doses in the LLNA and elicitation-threshold doses in the GPMT was relatively good (r=0.73). The results suggest the possibility to estimate human elicitation-threshold doses, which are definitely lacking in the process of risk assessment for skin-sensitizers, from the data of the LLNA.

  4. Quantitative comparison of the results obtained by the multiple-dose guinea pig maximization test and the non-radioactive murine local lymph-node assay for various biocides

    International Nuclear Information System (INIS)

    Yamano, Tetsuo; Shimizu, Mitsuru; Noda, Tsutomu

    2005-01-01

    We compared the results of the multiple-dose guinea pig maximization test (GPMT) and the non-radioactive murine local lymph-node assay (LLNA) for various biocides. Thirteen out of 17 positive biocides in the GPMT gave positive results in the LLNA. In the GPMT, the minimum first induction doses ranged over four orders (0.00005-0.5%), while elicitation-threshold doses, which were evaluated using an optimally sensitized group of animals in the multiple-dose studies, ranged over five orders (0.00006-2.8%). In the LLNA, minimum induction doses ranged over more than three orders (0.01-30%). With respect to 13 biocides that were positive in both the GPMT and the LLNA, results were quantitatively compared. When compared after conversion to corresponding area doses (μg/cm), the minimum doses required to elicit skin reaction in guinea pigs were always lower than that for induction in mice with all biocides. Correlation between minimum induction doses from the GPMT and the LLNA seemed poor (r = 0.57), while that between minimum induction doses in the LLNA and elicitation-threshold doses in the GPMT was relatively good (r = 0.73). The results suggest the possibility to estimate human elicitation-threshold doses, which are definitely lacking in the process of risk assessment for skin-sensitizers, from the data of the LLNA

  5. TH-302, a hypoxia-activated prodrug with broad in vivo preclinical combination therapy efficacy: optimization of dosing regimens and schedules.

    Science.gov (United States)

    Liu, Qian; Sun, Jessica D; Wang, Jingli; Ahluwalia, Dharmendra; Baker, Amanda F; Cranmer, Lee D; Ferraro, Damien; Wang, Yan; Duan, Jian-Xin; Ammons, W Steve; Curd, John G; Matteucci, Mark D; Hart, Charles P

    2012-06-01

    Subregional hypoxia is a common feature of tumors and is recognized as a limiting factor for the success of radiotherapy and chemotherapy. TH-302, a hypoxia-activated prodrug selectively targeting hypoxic regions of solid tumors, delivers a cytotoxic warhead to the tumor, while maintaining relatively low systemic toxicity. The antitumor activity, different dosing sequences, and dosing regimens of TH-302 in combination with commonly used conventional chemotherapeutics were investigated in human tumor xenograft models. Seven chemotherapeutic drugs (docetaxel, cisplatin, pemetrexed, irinotecan, doxorubicin, gemcitabine, and temozolomide) were tested in combination with TH-302 in eleven human xenograft models, including non-small cell lung cancer (NSCLC), colon cancer, prostate cancer, fibrosarcoma, melanoma, and pancreatic cancer. The antitumor activity of docetaxel, cisplatin, pemetrexed, irinotecan, doxorubicin, gemcitabine, and temozolomide was increased when combined with TH-302 in nine out of eleven models tested. Administration of TH-302 2-8 h prior to the other chemotherapeutics yielded superior efficacy versus other sequences tested. Simultaneous administration of TH-302 and chemotherapeutics increased toxicity versus schedules with dosing separations. In a dosing optimization study, TH-302 administered daily at 50 mg/kg intraperitoneally for 5 days per week in the H460 NSCLC model showed the optimal response with minimal toxicity. TH-302 enhances the activity of a wide range of conventional anti-neoplastic agents in a broad panel of in vivo xenograft models. These data highlight in vivo effects of schedule and order of drug administration in regimen efficacy and toxicity and have relevance to the design of human regimens incorporating TH-302.

  6. A randomised, double-blind, placebo-controlled, crossover study to assess the efficacy and safety of three dosing schedules of agalsidase alfa enzyme replacement therapy for Fabry disease.

    Science.gov (United States)

    Hughes, D A; Deegan, P B; Milligan, A; Wright, N; Butler, L H; Jacobs, A; Mehta, A B

    2013-07-01

    Anecdotal reports suggest that the currently approved dosing interval of agalsidase alfa (0.2 mg/kg/2 weeks) for Fabry disease treatment is too long. This randomised, double-blind, placebo-controlled, crossover study investigated three altered dosing intervals. 18 Fabry patients received three agalsidase alfa dosing schedules, each for four weeks (A: 0.2 mg/kg∗2 weeks, B: 0.1 mg/kg/week, C: 0.2 mg/kg/week). Health state, pain levels, sweat volume and latency and plasma and urinary globotriaosylceramide levels were recorded throughout the study. No significant differences were found among the schedules for the primary efficacy outcome of self-assessed health state, or for pain scores. A trend toward increased sweat volume on QSART testing, and reduced urine globotriaosylceramide concentration were seen with treatment schedule C. Agalsidase alfa was safe and well tolerated with all schedules. In conclusion, the primary analyses did not find weekly infusions of agalsidase alfa to be statistically better than the approved dosing schedule however the data indicates that further studies with more patients over a longer period are required to more accurately determine the optimum dose and schedule. Copyright © 2013 Elsevier Inc. All rights reserved.

  7. Evaluation of an every-other-day palonosetron schedule to control emesis in multiple-day high-dose chemotherapy.

    Science.gov (United States)

    Mirabile, Aurora; Celio, Luigi; Magni, Michele; Bonizzoni, Erminio; Gianni, Alessandro Massimo; Di Nicola, Massimo

    2014-12-01

    Efficacy of intermittent palonosetron dosing in patients undergoing multiple-day, high-dose chemotherapy (HDC) was investigated. Fifty-eight patients received palonosetron (0.25 mg intravenous [iv.]) every other day plus daily dexamethasone (8 mg iv. twice daily) dosing. The primary end point was complete control (CC; no emesis, no rescue anti-emetics, and no more than mild nausea) in the overall acute-period (until 24 h after chemotherapy completion). Acute-period CC occurred in 81% and 50% of patients receiving palonosetron and ondansetron (historical control cohort), respectively. Palonosetron (odds ratio [OR]: 4.37; p = 0.001) and a longer duration of HDC regimen (OR: 3.47; p = 0.011) independently predicted a better anti-emetic outcome. Palonosetron every other day plus daily dexamethasone is an effective anti-emetic coverage in patients undergoing HDC.

  8. Hepatitis A vaccine. A new convenient single-dose schedule with booster when long-term immunization is warranted

    DEFF Research Database (Denmark)

    Victor, J; Knudsen, J D; Nielsen, L P

    1994-01-01

    A total of 162 anti-HAV-negative healthy adults were immunized with a single high dose (1440 ELISA units = 1 ml) of inactivated hepatitis A vaccine and a booster was given at month 6. Antibodies were measured after modification of a commercial ELISA kit, enabling quantification of titres down to 6...

  9. Allergenicity evaluation of p-chloro-m-cresol and p-chloro-m-xylenol by non-radioactive murine local lymph-node assay and multiple-dose guinea pig maximization test

    International Nuclear Information System (INIS)

    Yamano, Tetsuo; Shimizu, Mitsuru; Noda, Tsutomu

    2003-01-01

    p-Chloro-m-cresol (PCMC) and p-chloro-m-xylenol (PCMX) are known to cause allergic contact dermatitis. For risk assessment of skin sensitizers, information on dose-response profiles in the induction and elicitation phases and cross-reactivity with analogous chemicals are important. In the non-radioactive local lymph-node assay (LLNA) using 5-bromo-2'-deoxyuridine instead of 3 H-methyl thymidine, significant effect on lymph node cell proliferation was detected at 10% PCMC and 25% PCMX, while in the multiple-dose guinea pig maximization test (GPMT) at least one animal tested in the group was sensitized at a 5 ppm induction dose of either chemical. When mean skin reaction score in an animal group maximally sensitized with each allergen with the GPMT was plotted against log challenge concentration, linear regression lines with high correlations were obtained in both cases. The calculated elicitation threshold was lower for PCMC than PCMX. The area under the linear regression line between the threshold point and 1% of the elicitation concentration, another index of relative elicitation potency, was also greater for PCMC. Bidirectional cross-reactivity between PCMX and PCMC was detected in the GPMT. PCMC was thus identified in both LLNA and GPMT as a stronger sensitizer than PCMX in both the induction and elicitation phases. These results suggest that the non-radioactive LLNA is a simple and useful method for evaluating allergenicity in the induction phase, while the GPMT using a maximally sensitized animal group is more suitable for assessing the dose-response profile and cross-reactivity in the elicitation phase

  10. Computational investigation of potential dosing schedules for a switch of medication from warfarin to rivaroxaban-an oral, direct Factor Xa inhibitor.

    Science.gov (United States)

    Burghaus, Rolf; Coboeken, Katrin; Gaub, Thomas; Niederalt, Christoph; Sensse, Anke; Siegmund, Hans-Ulrich; Weiss, Wolfgang; Mueck, Wolfgang; Tanigawa, Takahiko; Lippert, Jörg

    2014-01-01

    The long-lasting anticoagulant effect of vitamin K antagonists can be problematic in cases of adverse drug reactions or when patients are switched to another anticoagulant therapy. The objective of this study was to examine in silico the anticoagulant effect of rivaroxaban, an oral, direct Factor Xa inhibitor, combined with the residual effect of discontinued warfarin. Our simulations were based on the recommended anticoagulant dosing regimen for stroke prevention in patients with atrial fibrillation. The effects of the combination of discontinued warfarin plus rivaroxaban were simulated using an extended version of a previously validated blood coagulation computer model. A strong synergistic effect of the two distinct mechanisms of action was observed in the first 2-3 days after warfarin discontinuation; thereafter, the effect was close to additive. Nomograms for the introduction of rivaroxaban therapy after warfarin discontinuation were derived for Caucasian and Japanese patients using safety and efficacy criteria described previously, together with the coagulation model. The findings of our study provide a mechanistic pharmacologic rationale for dosing schedules during the therapy switch from warfarin to rivaroxaban and support the switching strategies as outlined in the Summary of Product Characteristics and Prescribing Information for rivaroxaban.

  11. Computational investigation of potential dosing schedules for a switch of medication from warfarin to rivaroxaban—an oral, direct Factor Xa inhibitor

    Science.gov (United States)

    Burghaus, Rolf; Coboeken, Katrin; Gaub, Thomas; Niederalt, Christoph; Sensse, Anke; Siegmund, Hans-Ulrich; Weiss, Wolfgang; Mueck, Wolfgang; Tanigawa, Takahiko; Lippert, Jörg

    2014-01-01

    The long-lasting anticoagulant effect of vitamin K antagonists can be problematic in cases of adverse drug reactions or when patients are switched to another anticoagulant therapy. The objective of this study was to examine in silico the anticoagulant effect of rivaroxaban, an oral, direct Factor Xa inhibitor, combined with the residual effect of discontinued warfarin. Our simulations were based on the recommended anticoagulant dosing regimen for stroke prevention in patients with atrial fibrillation. The effects of the combination of discontinued warfarin plus rivaroxaban were simulated using an extended version of a previously validated blood coagulation computer model. A strong synergistic effect of the two distinct mechanisms of action was observed in the first 2–3 days after warfarin discontinuation; thereafter, the effect was close to additive. Nomograms for the introduction of rivaroxaban therapy after warfarin discontinuation were derived for Caucasian and Japanese patients using safety and efficacy criteria described previously, together with the coagulation model. The findings of our study provide a mechanistic pharmacologic rationale for dosing schedules during the therapy switch from warfarin to rivaroxaban and support the switching strategies as outlined in the Summary of Product Characteristics and Prescribing Information for rivaroxaban. PMID:25426077

  12. Twelve-hour brain lithium concentration in lithium maintenance treatment of manic-depressive disorder: daily versus alternate-day dosing schedule

    DEFF Research Database (Denmark)

    Jensen, H.V.; Plenge, P; Stensgaard, A

    1996-01-01

    The 12-h brain lithium concentration was measured by lithium-7 magnetic resonance spectroscopy in ten manic-depressive patients receiving daily or alternate-day lithium carbonate treatment. The median dose of lithium carbonate was 800 mg in the daily treatment group and 1200 mg in the alternate......-day group. Median 12-h serum lithium concentration in the two groups was 0.86 mmol l-1 and 0.55 mmol l-1, respectively, while the corresponding concentration in brain was 0.67 mmol l-1 and 0.52 mmol l-1, respectively. The 12-h brain lithium concentration was independent of lithium dosing schedule (multiple...... linear regression), but correlated significantly with the 12-h serum lithium concentration (P = 0.003; B = 0.53, 95% c.l. 0.24-0.82; beta = 0.83). Thus at identical 12-h serum lithium concentrations the 12-h brain lithium concentration is similar with both treatment regimes. As the risk of manic...

  13. Maximizing the Benefit-Cost Ratio of Anthracyclines in Metastatic Breast Cancer: Case Report of a Patient with a Complete Response to High-Dose Doxorubicin

    Directory of Open Access Journals (Sweden)

    Kevin Shee

    2016-12-01

    Full Text Available Despite the clinical efficacy of anthracycline agents such as doxorubicin, dose-limiting cardiac toxicities significantly limit their long-term use. Here, we present the case of a 33-year-old female patient with extensive metastatic ER+/PR+/HER2– mucinous adenocarcinoma of the breast, who was started on doxorubicin/cyclophosphamide therapy after progressing on paclitaxel and ovarian suppressor goserelin with aromatase inhibitor exemestane. The patient was comanaged by cardiology, who carefully monitored measures of cardiac function, including EKGs, serial echocardiograms, and profiling of lipids, troponin, and pro-BNP every 2 months. The patient was treated with the cardioprotective agent dexrazoxane, and changes in cardiac markers [e.g. decreases in ejection fraction (EF] were immediately addressed by therapeutic intervention with the ACE inhibitor lisinopril and beta-blocker metoprolol. The patient had a complete response to doxorubicin therapy, with a cumulative dose of 1,350 mg/m2, which is significantly above the recommended limits, and to our knowledge, the highest dose reported in literature. Two and a half years after the last doxorubicin cycle, the patient is asymptomatic with no cardiotoxicity and an excellent quality of life. This case highlights the importance of careful monitoring and management of doxorubicin-mediated cardiotoxicity, and that higher cumulative doses of anthracyclines can be considered in patients with ongoing clinical benefit.

  14. Impact of Hepatitis A vaccination with a two-dose schedule in Panama: Results of epidemiological surveillance and time trend analysis.

    Science.gov (United States)

    Estripeaut, Dora; Contreras, Rodolfo; Tinajeros, Olga; Castrejón, Maria Mercedes; Shafi, Fakrudeen; Ortega-Barria, Eduardo; DeAntonio, Rodrigo

    2015-06-22

    In April 2007, Panama introduced Hepatitis A universal vaccination using a two-dose schedule (Havrix(®)junior; GSK Vaccines, Belgium). We assessed the impact of this hepatitis A vaccine three years after it was recommended for universal mass vaccination in Panama. Hepatitis A vaccination impact was assessed using two different approaches. The first approach used retrospective data (incidence and number of cases for all age groups), collected from the passive surveillance of the Epidemiologic Surveillance System of the Ministry of Health of hepatitis A and unspecified hepatitis before (2000-2006) and after (2008-2010) introduction of hepatitis A vaccine. The second approach was a prospective hospital-based active surveillance for hepatitis cases conducted in subjects (0-14 years) during 2009-2011 at three sentinel hospitals in Panama. Overall, the annual incidence of hepatitis A and unspecified hepatitis in 2008, 2009 and 2010 were 13.1, 7.9 and 3.7 per 100,000 subjects, lower than the baseline incidence of 51.1 per 100,000 subjects. In comparison to the mean baseline period (2000-2006), there was an 82% mean reduction in the overall hepatitis-related outcomes (hepatitis A and unspecified hepatitis) after vaccine introduction (2008-2010) in all age groups. In the hospital-based surveillance (2009-2011), of the 42 probable viral hepatitis A cases, nine cases were confirmed as acute hepatitis A (8 in 2009, 1 in 2010). Of these confirmed cases, two belonged to the targeted vaccine group (1-4 years) but were not vaccinated. Our study suggests that the introduction of two-dose hepatitis A vaccines in Panama has contributed to the reduction in the incidence of overall hepatitis-related outcomes for all age groups, suggesting herd protection. Additional monitoring is required to document a sustained long-term effect. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  15. Comparison of two-dose priming plus 9-month booster with a standard three-dose priming schedule for a ten-valent pneumococcal conjugate vaccine in Nepalese infants: a randomised, controlled, open-label, non-inferiority trial.

    Science.gov (United States)

    Hamaluba, Mainga; Kandasamy, Rama; Upreti, Shyam R; Subedi, Giri R; Shrestha, Shrijana; Bhattarai, Shiva; Gurung, Meeru; Pradhan, Rahul; Voysey, Merryn; Gurung, Santosh; Pradhan, Shachi; Thapa, Anushil K; Maharjan, Rakesh; Kiran, Usha; Kerridge, Simon A; Hinds, Jason; van der Klis, Fiona; Snape, Matthew D; Murdoch, David R; Kelly, Sarah; Kelly, Dominic F; Adhikari, Neelam; Thorson, Stephen; Pollard, Andrew J

    2015-04-01

    Use of pneumococcal conjugate vaccines (PCVs) in resource-poor countries has focused on early infant immunisation with little emphasis on protection in late infancy and beyond. Boosting of the immune response later in infancy might provide improved persistence of immunogenicity into early childhood, however data are scarce. The aim of this study was to investigate if a two-dose prime with booster at age 9 months compared with a three-dose prime-only PCV schedule provided non-inferior immunogenicity in early infancy and superior persistence of antibody responses in early childhood. We did an open-label, randomised, parallel group, controlled trial in healthy infants aged 40-60 days from Kathmandu, Nepal. Participants were randomly allocated (4:4:5 ratio) to receive PCV10 in addition to routine immunisations either as a two-dose prime and boost (2+1), three-dose prime (3+0), or two doses after completion of the initial study phase (0+2). We used a computer generated randomisation list with randomly varying block sizes. We followed up participants at age 2-4 years together with a group of unvaccinated controls. Sera were analysed for opsonophagocytic activity, protein D, and PCV10 serotype-specific IgG. Laboratory staff was masked to intervention group assignment. The primary outcome measure was to determine the proportion of participants in the 2+1 group at age 10 months with specific IgG for serotypes 1, 5, and 14 of at least 0·2 μg/mL in the per-protocol population. The secondary outcomes were non-inferiority (within 10% levels) at age 18 weeks for the proportion of participants in the 2+1 group compared with the 3+0 group with serotypes 1, 5, and 14 specific IgG of at least 0·2 μg/mL; the proportion of participants with PCV10 serotype-specific IgG of at least 0·2 μg/mL and opsonophagocytic activity reciprocal titre of at least 8 at ages 18 weeks and 10 months; and nasopharyngeal pneumococcal serotype-specific carriage rates at age 9 months in each study

  16. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  17. Profit maximization mitigates competition

    DEFF Research Database (Denmark)

    Dierker, Egbert; Grodal, Birgit

    1996-01-01

    We consider oligopolistic markets in which the notion of shareholders' utility is well-defined and compare the Bertrand-Nash equilibria in case of utility maximization with those under the usual profit maximization hypothesis. Our main result states that profit maximization leads to less price...... competition than utility maximization. Since profit maximization tends to raise prices, it may be regarded as beneficial for the owners as a whole. Moreover, if profit maximization is a good proxy for utility maximization, then there is no need for a general equilibrium analysis that takes the distribution...... of profits among consumers fully into account and partial equilibrium analysis suffices...

  18. Using Microsoft Excel to compute the 5% overall site X/Q value and the 95th percentile of the distribution of doses to the nearest maximally exposed offsite individual (MEOI).

    Science.gov (United States)

    Vickers, Linda D

    2010-05-01

    This paper describes the method using Microsoft Excel (Microsoft Corporation One Microsoft Way Redmond, WA 98052-6399) to compute the 5% overall site X/Q value and the 95th percentile of the distribution of doses to the nearest maximally exposed offsite individual (MEOI) in accordance with guidance from DOE-STD-3009-1994 and U.S. NRC Regulatory Guide 1.145-1982. The accurate determination of the 5% overall site X/Q value is the most important factor in the computation of the 95th percentile of the distribution of doses to the nearest MEOI. This method should be used to validate software codes that compute the X/Q. The 95th percentile of the distribution of doses to the nearest MEOI must be compared to the U.S. DOE Evaluation Guide of 25 rem to determine the relative severity of hazard to the public from a postulated, unmitigated design basis accident that involves an offsite release of radioactive material.

  19. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  20. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  1. Maximizing therapeutic gain with gemcitabine and fractionated radiation

    International Nuclear Information System (INIS)

    Mason, Kathy A.; Milas, Luka; Hunter, Nancy R.; Elshaikh, Mohamed; Buchmiller, Lara; Kishi, Kazushi; Hittelman, K. Walter; Ang, K. Kian

    1999-01-01

    Purpose/Objective: The nucleoside analogue gemcitabine inhibits cellular repair and repopulation, induces apoptosis, causes tumor growth delay, and enhances radiation-induced growth delay. After single doses of drug and radiation, maximum enhancement of tumor response was obtained when gemcitabine preceded radiation by at least 24 h. Conversely, the cellular radioresponse of the normal gastrointestinal epithelium was slightly protected when gemcitabine and radiation were separated by 24 h. This differential response created a time frame within which therapeutic gain could be maximized. In our present investigation, we sought to define the most therapeutically beneficial scheme of gemcitabine administration when combined with fractionated radiotherapy. Methods and Materials: C3Hf/Kam mice were given identical drug and radiation schedules of administration, and both normal tissue (jejunal mucosa) and tumor (Sa-NH) responses were measured. Irradiation was given once per day for 5 days in normal tissue and tumor growth delay studies and twice per day for the tumor cure endpoint. A total dose of 25 mg/kg gemcitabine was given i.p. in 1 of 3 schedules: a single dose of 25 mg/kg 24 h before the start of fractionated irradiation, 12.5 mg/kg 24 h before the first and third radiation doses, or 24 h before each of 5 radiation doses. Groups of mice bearing 7- or 8-mm diameter tumors were treated with gemcitabine alone or in combination with fractionated irradiation under ambient or hypoxic conditions. The survival response of the jejunal mucosa was quantified by the microcolony assay and histologically by quantifying apoptosis, mitosis, S-phase fraction, and crypt cellularity. Results: For tumor growth delay, dose-modifying factors (DMFs) were similar (1.34-1.46) for all 3 schedules of drug administration. In contrast, the response of the jejunum was strongly dependent on the schedule of gemcitabine administration. A single dose of gemcitabine before the start of fractionated

  2. Mature results of a randomized trial comparing two fractionation schedules of high dose rate endoluminal brachytherapy for the treatment of endobronchial tumors

    International Nuclear Information System (INIS)

    Niemoeller, Olivier M; Pöllinger, Barbara; Niyazi, Maximilian; Corradini, Stefanie; Manapov, Farkhad; Belka, Claus; Huber, Rudolf M

    2013-01-01

    To determine the efficacy of high dose rate endobronchial brachytherapy (HDR-BT) for the treatment of centrally located lung tumors, two different fractionation schedules were compared regarding local tumor response, side effects and survival. Mature retrospective results with longer follow-up and more patients were analyzed. Initial results were published by Huber et al. in 1995. 142 patients with advanced, centrally located malignant tumors with preferential endoluminal growth were randomized to receive 4 fractions of 3.8 Gy (time interval: 1 week, n = 60, group I) or 2 fractions of 7.2 Gy (time interval: 3 weeks, n = 82, group II) endobronchial HDR-BT. Age, gender, tumor stage, Karnofsky Performance Score and histology were equally distributed between both groups. Local tumor response with 2 fractions of 7.2 Gy was significantly higher as compared to 4 fractions of 3.8 Gy (median 12 vs. 6 weeks; p ≤ 0.015). Median survival was similar in both groups (19 weeks in the 4 fractions group vs. 18 weeks in the 2 fractions group). Fatal hemoptysis was less frequent following irradiation with 2 × 7.2 Gy than with 4 × 3.8 Gy, although the difference did not achieve statistical significance (12.2% vs. 18.3%, respectively. p = 0,345). Patients presenting with squamous cell carcinoma were at higher risk of bleeding compared to other histology (21.9% vs. 9%, p = 0,035). Multivariate analysis with regard to overall survival, revealed histology (p = 0.02), Karnofsky Performance Score (p < 0.0001) and response to therapy (p < 0.0001) as significant prognostic factors. For patients showing complete response the median survival was 57 weeks, while for patients with progressive disease median survival time was 8 weeks, p < 0.0001. The KPS at the start of the treatment was significantly correlated with survival. Patients presenting with a KPS ≤ 60 at the start had a significantly (p = 0,032) shorter survival time (10 weeks) than patients with a KPS > 60 (29 weeks). Moreover

  3. Meal phosphate variability does not support fixed dose phosphate binder schedules for patients treated with peritoneal dialysis: a prospective cohort study.

    Science.gov (United States)

    Leung, Simon; McCormick, Brendan; Wagner, Jessica; Biyani, Mohan; Lavoie, Susan; Imtiaz, Rameez; Zimmerman, Deborah

    2015-12-09

    Removal of phosphate by peritoneal dialysis is insufficient to maintain normal serum phosphate levels such that most patients must take phosphate binders with their meals. However, phosphate 'counting' is complicated and many patients are simply prescribed a specific dose of phosphate binders with each meal. Therefore, our primary objective was to assess the variability in meal phosphate content to determine the appropriateness of this approach. In this prospective cohort study, adult patients with ESRD treated with peritoneal dialysis and prescribed phosphate binder therapy were eligible to participate. Participants were excluded from the study if they were unable to give consent, had hypercalcemia, were visually or hearing impaired or were expected to receive a renal transplant during the time of the study. After providing informed consent, patients kept a 3-day diet diary that included all foods and beverages consumed in addition to portion sizes. At the same time, patients documented the amount of phosphate binders taken with each meal. The phosphate content of the each meal was estimated using ESHA Food Processor SQL Software by a registered dietitian. Meal phosphate and binder variability were estimated by the Intra Class Correlation Coefficient (ICC) where 0 indicates maximal variability and 1 indicates no variability. Seventy-eight patients consented to participate in the study; 18 did not complete the study protocol. The patients were 60 (± 17) years, predominately male (38/60) and Caucasian (51/60). Diabetic nephropathy was the most common cause of end stage kidney disease. The daily phosphate intake including snacks ranged from 959 ± 249 to 1144 ± 362 mg. The phosphate ICC by meal: breakfast 0.63, lunch 0.16; supper 0.27. The phosphate binder ICC by meal: breakfast 0.68, lunch 0.73, supper 0.67. The standard prescription of a set number of phosphate binders with each meal is not supported by the data; patients do not appear to be adjusting their

  4. Maximally incompatible quantum observables

    Energy Technology Data Exchange (ETDEWEB)

    Heinosaari, Teiko, E-mail: teiko.heinosaari@utu.fi [Turku Centre for Quantum Physics, Department of Physics and Astronomy, University of Turku, FI-20014 Turku (Finland); Schultz, Jussi, E-mail: jussi.schultz@gmail.com [Dipartimento di Matematica, Politecnico di Milano, Piazza Leonardo da Vinci 32, I-20133 Milano (Italy); Toigo, Alessandro, E-mail: alessandro.toigo@polimi.it [Dipartimento di Matematica, Politecnico di Milano, Piazza Leonardo da Vinci 32, I-20133 Milano (Italy); Istituto Nazionale di Fisica Nucleare, Sezione di Milano, Via Celoria 16, I-20133 Milano (Italy); Ziman, Mario, E-mail: ziman@savba.sk [RCQI, Institute of Physics, Slovak Academy of Sciences, Dúbravská cesta 9, 84511 Bratislava (Slovakia); Faculty of Informatics, Masaryk University, Botanická 68a, 60200 Brno (Czech Republic)

    2014-05-01

    The existence of maximally incompatible quantum observables in the sense of a minimal joint measurability region is investigated. Employing the universal quantum cloning device it is argued that only infinite dimensional quantum systems can accommodate maximal incompatibility. It is then shown that two of the most common pairs of complementary observables (position and momentum; number and phase) are maximally incompatible.

  5. Maximally incompatible quantum observables

    International Nuclear Information System (INIS)

    Heinosaari, Teiko; Schultz, Jussi; Toigo, Alessandro; Ziman, Mario

    2014-01-01

    The existence of maximally incompatible quantum observables in the sense of a minimal joint measurability region is investigated. Employing the universal quantum cloning device it is argued that only infinite dimensional quantum systems can accommodate maximal incompatibility. It is then shown that two of the most common pairs of complementary observables (position and momentum; number and phase) are maximally incompatible.

  6. An effective deep-inspiration breath-hold radiotherapy technique for left-breast cancer: impact of post-mastectomy treatment, nodal coverage, and dose schedule on organs at risk

    Directory of Open Access Journals (Sweden)

    Rice L

    2017-06-01

    Full Text Available Lynsey Rice,1,2 Christy Goldsmith,1,2 Melanie ML Green,2 Susan Cleator,1,2 Patricia M Price1,2 1Department of Radiation Oncology, The Harley Street Clinic, 2Department of Surgery and Cancer, Imperial College London, London, UK Background: We developed, applied, and prospectively evaluated a novel deep-inspiration breath-hold (DIBH screening and delivery technique to optimize cardiac sparing in left-breast radiotherapy (RT at our clinic. The impact of set-up and dose variables upon organs at risk (OAR dose in DIBH RT was investigated.Methods and materials: All patients with left-breast cancer referred between 2011 and 2014 – of all disease stages, set-up variations, and dose prescriptions – were included. Radiographers used simple screening criteria at CT simulation, to systematically assess patients for obvious DIBH benefit and capability. Selected patients received forward-planned intensity-modulated RT (IMRT based on a DIBH CT scan. A 3D-surface monitoring system with visual feedback assured reproducible DIBH positioning during gated radiation delivery. Patient, target set-up, and OAR dose information were collected at treatment.Results: Of 272 patients who were screened, 4 withdrew, 56 showed no obvious advantage, and 56 showed benefit but had suitability issues; 156 patients were selected and successfully completed DIBH treatment. The technique was compatible with complex set-up and optimal target coverage was maintained. Comparison of free-breathing (FB and DIBH treatment plans in the first five patients enrolled confirmed DIBH reduced heart radiation by ~80% (p = 0.032. Low OAR doses were achieved overall: the mean (95% confidence interval [CI] heart dose was 1.17 (1.12–1.22 Gy, and the mean ipsilateral lung dose was 5.26 (5.01–5.52 Gy. Patients who underwent a standard radiation schedule (40 Gy/15# after breast-conserving surgery had the lowest OAR doses: post-mastectomy treatment, simultaneous supraclavicular (SCV node

  7. Maximizers versus satisficers

    OpenAIRE

    Andrew M. Parker; Wandi Bruine de Bruin; Baruch Fischhoff

    2007-01-01

    Our previous research suggests that people reporting a stronger desire to maximize obtain worse life outcomes (Bruine de Bruin et al., 2007). Here, we examine whether this finding may be explained by the decision-making styles of self-reported maximizers. Expanding on Schwartz et al. (2002), we find that self-reported maximizers are more likely to show problematic decision-making styles, as evidenced by self-reports of less behavioral coping, greater dependence on others when making decisions...

  8. Maximal combustion temperature estimation

    International Nuclear Information System (INIS)

    Golodova, E; Shchepakina, E

    2006-01-01

    This work is concerned with the phenomenon of delayed loss of stability and the estimation of the maximal temperature of safe combustion. Using the qualitative theory of singular perturbations and canard techniques we determine the maximal temperature on the trajectories located in the transition region between the slow combustion regime and the explosive one. This approach is used to estimate the maximal temperature of safe combustion in multi-phase combustion models

  9. The Effect of Biologically Effective Dose and Radiation Treatment Schedule on Overall Survival in Stage I Non-Small Cell Lung Cancer Patients Treated With Stereotactic Body Radiation Therapy

    Energy Technology Data Exchange (ETDEWEB)

    Stahl, John M. [Department of Therapeutic Radiology, Yale School of Medicine, New Haven, Connecticut (United States); Ross, Rudi [21st Century Oncology, Fort Myers, Florida (United States); Harder, Eileen M.; Mancini, Brandon R. [Department of Therapeutic Radiology, Yale School of Medicine, New Haven, Connecticut (United States); Soulos, Pamela R. [Cancer Outcomes, Public Policy and Effectiveness Research (COPPER) Center, Yale School of Medicine, New Haven, Connecticut (United States); Finkelstein, Steven E.; Shafman, Timothy D.; Dosoretz, Arie P. [21st Century Oncology, Fort Myers, Florida (United States); Evans, Suzanne B.; Husain, Zain A.; Yu, James B. [Department of Therapeutic Radiology, Yale School of Medicine, New Haven, Connecticut (United States); Gross, Cary P. [Cancer Outcomes, Public Policy and Effectiveness Research (COPPER) Center, Yale School of Medicine, New Haven, Connecticut (United States); Decker, Roy H., E-mail: roy.decker@yale.edu [Department of Therapeutic Radiology, Yale School of Medicine, New Haven, Connecticut (United States)

    2016-12-01

    Purpose: To determine the effect of biologically effective dose (BED{sub 10}) and radiation treatment schedule on overall survival (OS) in patients with early-stage non-small cell lung cancer (NSCLC) undergoing stereotactic body radiation therapy (SBRT). Methods and Materials: Using data from 65 treatment centers in the United States, we retrospectively reviewed the records of T1-2 N0 NSCLC patients undergoing SBRT alone from 2006 to 2014. Biologically relevant covariates, including dose per fraction, number of fractions, and time between fractions, were used to quantify BED{sub 10} and radiation treatment schedule. The linear-quadratic equation was used to calculate BED{sub 10} and to generate a dichotomous dose variable of <105 Gy versus ≥105 Gy BED{sub 10}. The primary outcome was OS. We used the Kaplan-Meier method, the log–rank test, and Cox proportional hazards regression with propensity score matching to determine whether prescription BED{sub 10} was associated with OS. Results: We identified 747 patients who met inclusion criteria. The median BED{sub 10} was 132 Gy, and 59 (7.7%) had consecutive-day fractions. Median follow-up was 41 months, and 452 patients (60.5%) had died by the conclusion of the study. The 581 patients receiving ≥105 Gy BED{sub 10} had a median survival of 28 months, whereas the 166 patients receiving <105 Gy BED{sub 10} had a median survival of 22 months (log–rank, P=.01). Radiation treatment schedule was not a significant predictor of OS on univariable analysis. After adjusting for T stage, sex, tumor histology, and Eastern Cooperative Oncology Group performance status, BED{sub 10} ≥105 Gy versus <105 Gy remained significantly associated with improved OS (hazard ratio 0.78, 95% confidence interval 0.62-0.98, P=.03). Propensity score matching on imbalanced variables within high- and low-dose cohorts confirmed a survival benefit with higher prescription dose. Conclusions: We found that dose escalation to 105 Gy BED

  10. Maximally multipartite entangled states

    Science.gov (United States)

    Facchi, Paolo; Florio, Giuseppe; Parisi, Giorgio; Pascazio, Saverio

    2008-06-01

    We introduce the notion of maximally multipartite entangled states of n qubits as a generalization of the bipartite case. These pure states have a bipartite entanglement that does not depend on the bipartition and is maximal for all possible bipartitions. They are solutions of a minimization problem. Examples for small n are investigated, both analytically and numerically.

  11. Maximizers versus satisficers

    Directory of Open Access Journals (Sweden)

    Andrew M. Parker

    2007-12-01

    Full Text Available Our previous research suggests that people reporting a stronger desire to maximize obtain worse life outcomes (Bruine de Bruin et al., 2007. Here, we examine whether this finding may be explained by the decision-making styles of self-reported maximizers. Expanding on Schwartz et al. (2002, we find that self-reported maximizers are more likely to show problematic decision-making styles, as evidenced by self-reports of less behavioral coping, greater dependence on others when making decisions, more avoidance of decision making, and greater tendency to experience regret. Contrary to predictions, self-reported maximizers were more likely to report spontaneous decision making. However, the relationship between self-reported maximizing and worse life outcomes is largely unaffected by controls for measures of other decision-making styles, decision-making competence, and demographic variables.

  12. Parallel machine scheduling to maximize the weighted number of ...

    African Journals Online (AJOL)

    in-time jobs was investigated. The problem was NP complete in the strong sense, for which finding an optimal solution had been considered very unlikely. The performances of 4 greedy heuristic algorithms (WO1, WO2, DO1 and DO2) ...

  13. Is CP violation maximal

    International Nuclear Information System (INIS)

    Gronau, M.

    1984-01-01

    Two ambiguities are noted in the definition of the concept of maximal CP violation. The phase convention ambiguity is overcome by introducing a CP violating phase in the quark mixing matrix U which is invariant under rephasing transformations. The second ambiguity, related to the parametrization of U, is resolved by finding a single empirically viable definition of maximal CP violation when assuming that U does not single out one generation. Considerable improvement in the calculation of nonleptonic weak amplitudes is required to test the conjecture of maximal CP violation. 21 references

  14. Intermittent Metronomic Drug Schedule Is Essential for Activating Antitumor Innate Immunity and Tumor Xenograft Regression

    Directory of Open Access Journals (Sweden)

    Chong-Sheng Chen

    2014-01-01

    Full Text Available Metronomic chemotherapy using cyclophosphamide (CPA is widely associated with antiangiogenesis; however, recent studies implicate other immune-based mechanisms, including antitumor innate immunity, which can induce major tumor regression in implanted brain tumor models. This study demonstrates the critical importance of drug schedule: CPA induced a potent antitumor innate immune response and tumor regression when administered intermittently on a 6-day repeating metronomic schedule but not with the same total exposure to activated CPA administered on an every 3-day schedule or using a daily oral regimen that serves as the basis for many clinical trials of metronomic chemotherapy. Notably, the more frequent metronomic CPA schedules abrogated the antitumor innate immune and therapeutic responses. Further, the innate immune response and antitumor activity both displayed an unusually steep dose-response curve and were not accompanied by antiangiogenesis. The strong recruitment of innate immune cells by the 6-day repeating CPA schedule was not sustained, and tumor regression was abolished, by a moderate (25% reduction in CPA dose. Moreover, an ~20% increase in CPA dose eliminated the partial tumor regression and weak innate immune cell recruitment seen in a subset of the every 6-day treated tumors. Thus, metronomic drug treatment must be at a sufficiently high dose but also sufficiently well spaced in time to induce strong sustained antitumor immune cell recruitment. Many current clinical metronomic chemotherapeutic protocols employ oral daily low-dose schedules that do not meet these requirements, suggesting that they may benefit from optimization designed to maximize antitumor immune responses.

  15. Dose fractionated gamma knife radiosurgery for large arteriovenous malformations on daily or alternate day schedule outside the linear quadratic model: Proof of concept and early results. A substitute to volume fractionation.

    Science.gov (United States)

    Mukherjee, Kanchan Kumar; Kumar, Narendra; Tripathi, Manjul; Oinam, Arun S; Ahuja, Chirag K; Dhandapani, Sivashanmugam; Kapoor, Rakesh; Ghoshal, Sushmita; Kaur, Rupinder; Bhatt, Sandeep

    2017-01-01

    To evaluate the feasibility, safety and efficacy of dose fractionated gamma knife radiosurgery (DFGKRS) on a daily schedule beyond the linear quadratic (LQ) model, for large volume arteriovenous malformations (AVMs). Between 2012-16, 14 patients of large AVMs (median volume 26.5 cc) unsuitable for surgery or embolization were treated in 2-3 of DFGKRS sessions. The Leksell G frame was kept in situ during the whole procedure. 86% (n = 12) patients had radiologic evidence of bleed, and 43% (n = 6) had presented with a history of seizures. 57% (n = 8) patients received a daily treatment for 3 days and 43% (n = 6) were on an alternate day (2 fractions) regimen. The marginal dose was split into 2 or 3 fractions of the ideal prescription dose of a single fraction of 23-25 Gy. The median follow up period was 35.6 months (8-57 months). In the three-fraction scheme, the marginal dose ranged from 8.9-11.5 Gy, while in the two-fraction scheme, the marginal dose ranged from 11.3-15 Gy at 50% per fraction. Headache (43%, n = 6) was the most common early postoperative complication, which was controlled with short course steroids. Follow up evaluation of at least three years was achieved in seven patients, who have shown complete nidus obliteration in 43% patients while the obliteration has been in the range of 50-99% in rest of the patients. Overall, there was a 67.8% reduction in the AVM volume at 3 years. Nidus obliteration at 3 years showed a significant rank order correlation with the cumulative prescription dose (p 0.95, P value 0.01), with attainment of near-total (more than 95%) obliteration rates beyond 29 Gy of the cumulative prescription dose. No patient receiving a cumulative prescription dose of less than 31 Gy had any severe adverse reaction. In co-variate adjusted ordinal regression, only the cumulative prescription dose had a significant correlation with common terminology criteria for adverse events (CTCAE) severity (P value 0.04), independent of age, AVM volume

  16. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  17. Safety and immune response to a challenge dose of hepatitis B vaccine in healthy children primed 10years earlier with hexavalent vaccines in a 3, 5, 11-month schedule: An open-label, controlled, multicentre trial in Italy.

    Science.gov (United States)

    Zanetti, Alessandro; Desole, Maria Giuseppina; Romanò, Luisa; d'Alessandro, Antonio; Conversano, Michele; Ferrera, Giuseppe; Panico, Maria Grazia; Tomasi, Alberto; Zoppi, Giorgio; Zuliani, Massimo; Thomas, Stéphane; Soubeyrand, Benoît; Eymin, Cécile; Lockhart, Stephen

    2017-07-13

    The strategy of vaccinating infants to prevent hepatitis B virus infection in adolescence or adulthood requires durable immunity. This study investigated responses to a challenge dose of monovalent hepatitis B vaccine in children primed with three doses of either Hexavac® or Infanrix hexa® 10years earlier during infancy. This open-label, controlled, multicentre study conducted in Italy, enrolled 751 healthy pre-adolescents (aged 11-13years) who were given either Hexavac (n=409) or Infanrix hexa (n=342) at 3, 5 and 11months of life. All participants received a challenge dose of a monovalent hepatitis B vaccine (HBVaxPro® 5µg). The concentrations of antibodies to hepatitis B surface antigen (anti-HBs) were measured before and 1month after the challenge dose. The analysis was descriptive and no formal hypothesis was tested. One month post-challenge, 331 participants in the Hexavac cohort [83.6%, 95% CI: 79.6; 87.1] and 324 in the Infanrix hexa cohort [96.4%, 95% CI: 93.8; 98.1] had anti-HBs concentrations ≥10mIU/mL. Before the challenge dose, an anti-HBs concentration of ≥10mIU/mL was found in 94 children in the Hexavac cohort [23.9%, 95% CI: 19.7; 28.4] and in 232 children in the Infanrix hexa cohort [69%, 95% CI: 63.8; 74.0]. Among children with a pre-challenge anti-HBs concentration of children (>80%) at least 10years after a two-dose primary and booster vaccination schedule with a hexavalent vaccine (Hexavac or Infanrix hexa). EudraCT Number: 2013-001602-28; clinicaltrials.gov: NCT02012998. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. Clinical outcome of stereotactic body radiotherapy for primary and oligometastatic lung tumors: a single institutional study with almost uniform dose with different five treatment schedules

    International Nuclear Information System (INIS)

    Aoki, Masahiko; Hatayama, Yoshiomi; Kawaguchi, Hideo; Hirose, Katsumi; Sato, Mariko; Akimoto, Hiroyoshi; Fujioka, Ichitaro; Ono, Shuichi; Tsushima, Eiki; Takai, Yoshihiro

    2016-01-01

    To evaluate clinical outcomes of stereotactic body radiotherapy (SBRT) for localized primary and oligometastatic lung tumors by assessing efficacy and safety of 5 regimens of varying fraction size and number. One-hundred patients with primary lung cancer (n = 69) or oligometastatic lung tumors (n = 31), who underwent SBRT between May 2003 and August 2010, were included. The median age was 75 years (range, 45–88). Of them, 98 were judged to have medically inoperable disease, predominantly due to chronic illness or advanced age. SBRT was performed using 3 coplanar and 3 non-coplanar fixed beams with a standard linear accelerator. Fraction sizes were escalated by 1 Gy, and number of fractions given was decreased by 1 for every 20 included patients. Total target doses were between 50 and 56 Gy, administered as 5–9 fractions. The prescribed dose was defined at the isocenter, and median overall treatment duration was 10 days (range, 5–22). The median follow-up was 51.1 months for survivors. The 3-year local recurrence rates for primary lung cancer and oligometastasis was 6 % and 3 %, respectively. The 3-year local recurrence rates for tumor sizes ≤3 cm and >3 cm were 3 % and 14 %, respectively (p = 0.124). Additionally, other factors (fraction size, total target dose, and BED 10 ) were not significant predictors of local control. Radiation pneumonia (≥ grade 2) was observed in 2 patients. Radiation-induced rib fractures were observed in 22 patients. Other late adverse events of greater than grade 2 were not observed. Within this dataset, we did not observe a dose response in BED 10 values between 86.4 and 102.6 Gy. SBRT with doses between 50 and 56 Gy, administered over 5–9 fractions achieved acceptable tumor control without severe complications

  19. Intensification of antitumor radiation effect by metronidazole and short-term hyperglycemia and dependence of therapeutic effect on schedules of fractionation and value of single dose

    International Nuclear Information System (INIS)

    Venkhvadze, N.G.

    1988-01-01

    Combined application of metronidazole and short-term hyperglycemia under fractionated irradiation of sarcoma-45, 340 in white rats-males is studied. Tumors were γ-irradiated with 60 Co threefold in 48 hours at 15 Gy single dose or irradiated threefold in a week at 20, 25 and 30 Gy doses. Efficiency of experimental therapy is cheked by dynamics of tumor regression, a number of animals with tumors reabsorbed temporarily, a number of animals recovered and time of tumor grouth up to the initial volume. It is established that combined application of metronidazole and short-term hyperglycemia under fractionated irradiation increases essentially the efficiency of radiotherapy carried out by large fractions with great time intervals. 7 refs.; 1 fig.; 2 tabs

  20. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    . The rostering process is non-trivial and especially when service is required around the clock, rostering may involve considerable effort from a designated planner. Therefore, in order to minimize costs and overstaffing, to maximize the utilization of available staff, and to ensure a high level of satisfaction...... as possible to the available staff, while respecting various requirements and rules and while including possible transportation time between tasks. This thesis presents a number of industrial applications in rostering and task scheduling. The applications exist within various contexts in health care....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied...

  1. Comparison of Different Fractionation Schedules Toward a Single Fraction in High-Dose-Rate Brachytherapy as Monotherapy for Low-Risk Prostate Cancer Using 3-Dimensional Radiobiological Models

    Energy Technology Data Exchange (ETDEWEB)

    Mavroidis, Panayiotis, E-mail: mavroidis@uthscsa.edu [Department of Radiation Oncology, University of Texas Health Sciences Center, San Antonio, Texas (United States); Department of Medical Radiation Physics, Karolinska Institutet and Stockholm University, Stockholm (Sweden); Milickovic, Natasa [Department of Medical Physics and Engineering, Strahlenklinik, Klinikum Offenbach GmbH, Offenbach (Germany); Cruz, Wilbert F. [Department of Radiation Oncology, University of Texas Health Sciences Center, San Antonio, Texas (United States); Tselis, Nikolaos [Strahlenklinik, Klinikum Offenbach GmbH, Offenbach (Germany); Karabis, Andreas [Pi-Medical Ltd., Athens (Greece); Stathakis, Sotirios; Papanikolaou, Nikos [Department of Radiation Oncology, University of Texas Health Sciences Center, San Antonio, Texas (United States); Zamboglou, Nikolaos [Strahlenklinik, Klinikum Offenbach GmbH, Offenbach (Germany); Baltas, Dimos [Department of Medical Physics and Engineering, Strahlenklinik, Klinikum Offenbach GmbH, Offenbach (Germany); Nuclear and Particle Physics Section, Physics Department, University of Athens, Athens (Greece)

    2014-01-01

    Purpose: The aim of the present study was the investigation of different fractionation schemes to estimate their clinical impact. For this purpose, widely applied radiobiological models and dosimetric measures were used to associate their results with clinical findings. Methods and Materials: The dose distributions of 12 clinical high-dose-rate brachytherapy implants for prostate were evaluated in relation to different fractionation schemes. The fractionation schemes compared were: (1) 1 fraction of 20 Gy; (2) 2 fractions of 14 Gy; (3) 3 fractions of 11 Gy; and (4) 4 fractions of 9.5 Gy. The clinical effectiveness of the different fractionation schemes was estimated through the complication-free tumor control probability (P{sub +}), the biologically effective uniform dose, and the generalized equivalent uniform dose index. Results: For the different fractionation schemes, the tumor control probabilities were 98.5% in 1 × 20 Gy, 98.6% in 2 × 14 Gy, 97.5% in 3 × 11 Gy, and 97.8% in 4 × 9.5 Gy. The corresponding P{sub +} values were 88.8% in 1 × 20 Gy, 83.9% in 2 × 14 Gy, 86.0% in 3 × 11 Gy, and 82.3% in 4 × 9.5 Gy. With use of the fractionation scheme 4 × 9.5 Gy as reference, the isoeffective schemes regarding tumor control for 1, 2, and 3 fractions were 1 × 19.68 Gy, 2 × 13.75 Gy, and 3 × 11.05 Gy. The optimum fractionation schemes for 1, 2, 3, and 4 fractions were 1 × 19.16 Gy with a P{sub +} of 91.8%, 2 × 13.2 Gy with a P{sub +} of 89.6%, 3 × 10.6 Gy with a P{sub +} of 88.4%, and 4 × 9.02 Gy with a P{sub +} of 86.9%. Conclusions: Among the fractionation schemes 1 × 20 Gy, 2 × 14 Gy, 3 × 11 Gy, and 4 × 9.5 Gy, the first scheme was more effective in terms of P{sub +}. After performance of a radiobiological optimization, it was shown that a single fraction of 19.2 to 19.7 Gy (average 19.5 Gy) should produce at least the same benefit as that given by the 4 × 9.5 Gy scheme, and it should reduce the expected total complication probability by

  2. Guinea pig maximization test

    DEFF Research Database (Denmark)

    Andersen, Klaus Ejner

    1985-01-01

    Guinea pig maximization tests (GPMT) with chlorocresol were performed to ascertain whether the sensitization rate was affected by minor changes in the Freund's complete adjuvant (FCA) emulsion used. Three types of emulsion were evaluated: the oil phase was mixed with propylene glycol, saline...

  3. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  4. Rabies vaccinations: are abbreviated intradermal schedules the future?

    NARCIS (Netherlands)

    Wieten, R. W.; Leenstra, T.; van Thiel, P. P. A. M.; van Vugt, M.; Stijnis, C.; Goorhuis, A.; Grobusch, M. P.

    2013-01-01

    Rabies is a deadly disease, and current preexposure vaccination schedules are lengthy and expensive. We identified nine studies investigating abbreviated schedules. Although initial responses were lower, accelerated adequate immune responses were elicited after booster vaccinations. Lower-dose (and

  5. Tri-maximal vs. bi-maximal neutrino mixing

    International Nuclear Information System (INIS)

    Scott, W.G

    2000-01-01

    It is argued that data from atmospheric and solar neutrino experiments point strongly to tri-maximal or bi-maximal lepton mixing. While ('optimised') bi-maximal mixing gives an excellent a posteriori fit to the data, tri-maximal mixing is an a priori hypothesis, which is not excluded, taking account of terrestrial matter effects

  6. Esquema reduzido de vacinação anti-rábica humana pré-exposição e avaliação de doses anuais de reforço A reduced schedule for anti-rabic pre-exposure vaccination in humans and annual assessment booster doses

    Directory of Open Access Journals (Sweden)

    Esther Luiza Bocato Chamelet

    1982-06-01

    Full Text Available São apresentados os resultados do emprego de esquema de vacinação anti-rábida humana pré-exposição, constituído de 3 doses de vacina tipo Fuenzalida-Palacios administradas a 165 pacientes em dias alternados, mais uma dose de reforço no 30.° dia após a dose inicial. Os títulos de anticorpos foram determinados por prova de soroneutralização em amostras de sangue colhidas antes, 30 e 40 dias após administração da primeira dose. Verificou-se que no 30.° dia, 74,6% dos pacientes apresentaram anticorpos neutralizantes no soro, valor que se elevou a 98,1% no quadragésimo dia, o que mostra a eficácia do esquema em relação à resposta imunitária em tempo relativamente curto e a importância da dose de reforço como estímulo à produção de anticorpos. Nos pacientes submetidos às doses anuais de reforço num período de 10 anos, verificou-se aumento gradual da presença de anticorpos antes da administração da dose de reforço subseqüente, até atingir valores de 100%. Face aos resultados obtidos foi sugerido que as doses de reforço sejam administradas a intervalos de tempo maiores e precedidas da titulagem de anticorpos a fim de se avaliar da necessidade ou não de sua administração.A reduced schedule for a pre-exposure anti-rabic immunization, of humans with 3 doses of 1 ml of Fuenzalida-Palacios type vaccine administered on alternate days, plus one booster 30 days after the first dose, was related. The blood samples were collected on the 0, 30th and 40th day after the first vaccine dose and the antibody titration was performed by serum neutralizing test. It was observed that 74,6% of the patients presented serum neutralizing antibodies on the 30th day and 98.1% on the 40th day, demonstrating the efficacy of this reduced schedule in stimulating the antibody response in a short time. The importance of a booster dose was emphasized. In the patients submitted to annual boosters over a period of 10 years, a gradual increase in

  7. Comparison of three rapamycin dosing schedules in A/J Tsc2+/- mice and improved survival with angiogenesis inhibitor or asparaginase treatment in mice with subcutaneous tuberous sclerosis related tumors

    Directory of Open Access Journals (Sweden)

    Dabora Sandra L

    2010-02-01

    Full Text Available Abstract Background Tuberous Sclerosis Complex (TSC is an autosomal dominant tumor disorder characterized by the growth of hamartomas in various organs including the kidney, brain, skin, lungs, and heart. Rapamycin has been shown to reduce the size of kidney angiomyolipomas associated with TSC; however, tumor regression is incomplete and kidney angiomyolipomas regrow after cessation of treatment. Mouse models of TSC2 related tumors are useful for evaluating new approaches to drug therapy for TSC. Methods In cohorts of Tsc2+/- mice, we compared kidney cystadenoma severity in A/J and C57BL/6 mouse strains at both 9 and 12 months of age. We also investigated age related kidney tumor progression and compared three different rapamycin treatment schedules in cohorts of A/J Tsc2+/- mice. In addition, we used nude mice bearing Tsc2-/- subcutaneous tumors to evaluate the therapeutic utility of sunitinib, bevacizumab, vincristine, and asparaginase. Results TSC related kidney disease severity is 5-10 fold higher in A/J Tsc2+/- mice compared with C57BL/6 Tsc2+/- mice. Similar to kidney angiomyolipomas associated with TSC, the severity of kidney cystadenomas increases with age in A/J Tsc2+/- mice. When rapamycin dosing schedules were compared in A/J Tsc2+/- cohorts, we observed a 66% reduction in kidney tumor burden in mice treated daily for 4 weeks, an 82% reduction in mice treated daily for 4 weeks followed by weekly for 8 weeks, and an 81% reduction in mice treated weekly for 12 weeks. In the Tsc2-/- subcutaneous tumor mouse model, vincristine is not effective, but angiogenesis inhibitors (sunitinib and bevacizumab and asparaginase are effective as single agents. However, these drugs are not as effective as rapamycin in that they increased median survival only by 24-27%, while rapamycin increased median survival by 173%. Conclusions Our results indicate that the A/J Tsc2+/- mouse model is an improved, higher through-put mouse model for future TSC

  8. Phase I/II Study Evaluating Early Tolerance in Breast Cancer Patients Undergoing Accelerated Partial Breast Irradiation Treated With the MammoSite Balloon Breast Brachytherapy Catheter Using a 2-Day Dose Schedule

    International Nuclear Information System (INIS)

    Wallace, Michelle; Martinez, Alvaro; Mitchell, Christina; Chen, Peter Y.; Ghilezan, Mihai; Benitez, Pamela; Brown, Eric; Vicini, Frank

    2010-01-01

    Purpose: Initial Phase I/II results using balloon brachytherapy to deliver accelerated partial breast irradiation (APBI) in 2 days in patients with early-stage breast cancer are presented. Materials and Methods: Between March 2004 and August 2007, 45 patients received adjuvant radiation therapy after lumpectomy with balloon brachytherapy in a Phase I/II trial delivering 2800 cGy in four fractions of 700 cGy. Toxicities were evaluated using the National Cancer Institute Common Toxicity Criteria for Adverse Events v3.0 scale and cosmesis was documented at ≥6 months. Results: The median age was 66 years (range, 48-83) and median skin spacing was 12 mm (range, 8-24). The median follow-up was 11.4 months (5.4-48 months) with 21 patients (47%) followed ≥1 year, 11 (24%) ≥2 years, and 7 (16%) ≥3 years. At <6 months (n = 45), Grade II toxicity rates were 9% radiation dermatitis, 13% breast pain, 2% edema, and 2% hyperpigmentation. Grade III breast pain was reported in 13% (n = 6). At ≥6 months (n = 43), Grade II toxicity rates were: 2% radiation dermatitis, 2% induration, and 2% hypopigmentation. Grade III breast pain was reported in 2%. Infection was 13% (n = 6) at <6 months and 5% (n = 2) at ≥6 months. Persistent seroma ≥6 months was 30% (n = 13). Fat necrosis developed in 4 cases (2 symptomatic). Rib fractures were seen in 4% (n = 2). Cosmesis was good/excellent in 96% of cases. Conclusions: Treatment with balloon brachytherapy using a 2-day dose schedule resulted acceptable rates of Grade II/III chronic toxicity rates and similar cosmetic results observed with a standard 5-day accelerated partial breast irradiation schedule.

  9. Rectal cancer delivery of radiotherapy in adequate time and with adequate dose is influenced by treatment center, treatment schedule, and gender and is prognostic parameter for local control: Results of study CAO/ARO/AIO-94

    International Nuclear Information System (INIS)

    Fietkau, Rainer; Roedel, Claus; Hohenberger, Werner; Raab, Rudolf; Hess, Clemens; Liersch, Torsten; Becker, Heinz; Wittekind, Christian; Hutter, Matthias; Hager, Eva; Karstens, Johann; Ewald, Hermann; Christen, Norbert; Jagoditsch, Michael; Martus, Peter; Sauer, Rolf

    2007-01-01

    Purpose: The impact of the delivery of radiotherapy (RT) on treatment results in rectal cancer patients is unknown. Methods and Materials: The data from 788 patients with rectal cancer treated within the German CAO/AIO/ARO-94 phase III trial were analyzed concerning the impact of the delivery of RT (adequate RT: minimal radiation RT dose delivered, 4300 cGy for neoadjuvant RT or 4700 cGy for adjuvant RT; completion of RT in <44 days for neoadjuvant RT or <49 days for adjuvant RT) in different centers on the locoregional recurrence rate (LRR) and disease-free survival (DFS) at 5 years. The LRR, DFS, and delivery of RT were analyzed as endpoints in multivariate analysis. Results: A significant difference was found between the centers and the delivery of RT. The overall delivery of RT was a prognostic factor for the LRR (no RT, 29.6% ± 7.8%; inadequate RT, 21.2% ± 5.6%; adequate RT, 6.8% ± 1.4%; p = 0.0001) and DFS (no RT, 55.1% ± 9.1%; inadequate RT, 57.4% ± 6.3%; adequate RT, 69.1% ± 2.3%; p = 0.02). Postoperatively, delivery of RT was a prognostic factor for LRR on multivariate analysis (together with pathologic stage) but not for DFS (independent parameters, pathologic stage and age). Preoperatively, on multivariate analysis, pathologic stage, but not delivery of RT, was an independent prognostic parameter for LRR and DFS (together with adequate chemotherapy). On multivariate analysis, the treatment center, treatment schedule (neoadjuvant vs. adjuvant RT), and gender were prognostic parameters for adequate RT. Conclusion: Delivery of RT should be regarded as a prognostic factor for LRR in rectal cancer and is influenced by the treatment center, treatment schedule, and patient gender

  10. Randomized phase 3 trial comparing 2 cisplatin dose schedules in 326 patients with locally advanced squamous cell cervical carcinoma: long-term follow-up.

    Science.gov (United States)

    Nagy, Viorica Magdalena; Ordeanu, Claudia; Coza, Ovidiu; Alin, Cristian Rancea; Traila, Alexandru; Todor, Nicolae

    2012-11-01

    The evaluation of 5-year results obtained through 2 radiochemotherapy (RCT) regimens: cisplatin (CDDP), 20 mg/m × 5 days every 21 days; and CDDP, 40 mg/m per week in locally advanced cervical carcinoma. In this single-institution prospective randomized phase 3 study, 326 patients with stage IIB to IIIB squamous cell cervical carcinoma treated from March 2003 to March 2005 were included. One hundred sixty patients (49%) had stage IIB cervical carcinoma, 103 patients (31.5%) had stage IIIA cervical carcinoma, and 63 patients (19.5%) had stage IIIB cervical carcinoma. The patients were randomly assigned to 2 therapeutic arms: 164 patients in arm A (5 days) concurrent RCT with CDDP, 20 mg/m per day, days 1 to 5 every 21 days; and 162 patients in arm B (weekly), concurrent RCT with CDDP, 40 mg/m per day weekly. All patients were treated with external beam radiotherapy on the abdominopelvic region using 15-MV x-rays and a cervical boost using the x-rays arch technique or medium-dose-rate intracavitary brachytherapy. The 5-year survival rate obtained through the 2 RCT regimens are not statistically different, even if a tendency of superiority can be observed in the 5-day arm as far as overall survival (78% in arm A vs 72% in arm B; p = 0.14) and disease-free survival (73% in arm A and 69% in arm B; p = 0.09) are concerned. Five-year local relapse-free survival was significantly superior in the 5-day CDDP arm (87%) in comparison with the weekly CDDP arm (77%); p < 0.01. In the 5-day arm, local relapse rate was twice lower, 21/164 (13%), compared with the weekly arm, 40/162 (25%); p < 0.01). Distance failures were identical in the 2 therapeutic groups: 22/164 (13%) and 21/162 (13%), respectively, which shows the superiority of arm A regarding local control. The results of our study demonstrate that RCT with cisplatin, 20 mg/m × 5 days every 21 days, is superior regarding local efficacy and is less toxic compared with the weekly chemotherapy regimen.

  11. MAXIM: The Blackhole Imager

    Science.gov (United States)

    Gendreau, Keith; Cash, Webster; Gorenstein, Paul; Windt, David; Kaaret, Phil; Reynolds, Chris

    2004-01-01

    The Beyond Einstein Program in NASA's Office of Space Science Structure and Evolution of the Universe theme spells out the top level scientific requirements for a Black Hole Imager in its strategic plan. The MAXIM mission will provide better than one tenth of a microarcsecond imaging in the X-ray band in order to satisfy these requirements. We will overview the driving requirements to achieve these goals and ultimately resolve the event horizon of a supermassive black hole. We will present the current status of this effort that includes a study of a baseline design as well as two alternative approaches.

  12. Social group utility maximization

    CERN Document Server

    Gong, Xiaowen; Yang, Lei; Zhang, Junshan

    2014-01-01

    This SpringerBrief explains how to leverage mobile users' social relationships to improve the interactions of mobile devices in mobile networks. It develops a social group utility maximization (SGUM) framework that captures diverse social ties of mobile users and diverse physical coupling of mobile devices. Key topics include random access control, power control, spectrum access, and location privacy.This brief also investigates SGUM-based power control game and random access control game, for which it establishes the socially-aware Nash equilibrium (SNE). It then examines the critical SGUM-b

  13. Comparison of the Effect of Pre-operative Single Oral Dose of Tramadol and Famotidine on Gastric Secretions pH and Volume in Patients Scheduled for Laparoscopic Cholecystectomy

    International Nuclear Information System (INIS)

    Khan, M. U.; Aqil, M.; Hussain, A.; Zahrani, T. A.; Hillis, M.

    2015-01-01

    Objective: To evaluate and compare the effects of pre-operative single oral dose of tramadol and famotidine on gastric secretions pH and volume in patients electively scheduled for laparoscopic cholecystectomy. Study Design: Randomized control trial. Place and Duration of Study: Department of Anaesthesia, King Saud University Riyadh, Saudi Arabia, from August 2011 to June 2013. Methodology: Ninety adult, ASA-I and II patients scheduled for laparoscopic cholecystectomy were included in the study. Patients were randomly assigned to receive pre-operatively either placebo (Group-C, n=30), oral tramadol 100 mg (Group-T, n=30) or famotidine 40 mg (Group-F, n=30). After induction of general anaesthesia, gastric fluid was aspirated through orogastric tube. The gastric secretions volume and pH was measured using pH meter. Results:There was no statistically difference between groups in age, weight and gender. The gastric secretions mean pH was 2.06 ± 0.22,2.04 ± 0.20, 5.79 ± 0.77 and volume was 0.59 ± 0.17, 0.59 ± 0.14 and 0.28 ± 0.16 ml/kg in Group-C, Group-T and Group-F respectively. There was a significant statistical difference in the mean pH values between Group-C vs. Group-F (p greater than 0.001) and Group-Tvs. Group-F (p greater than 0.001). Statistically significant difference was also found in the mean gastric secretions volume between Group - C vs. Group-F (p greater than 0.001) and Group-Tvs. Group-F (p greater than 0.001). There was no significant difference in the mean gastric fluid pH values (p=0.99) and mean gastric secretions volume (p=0.99) between Group-Tand Group-C. Conclusion:As compared to famotidine, pre-operative single oral dose of tramadol was unable to elevate the desired level of gastric fluid pH (less than 2.5) and decrease in gastric secretions volume (greater than 0.4ml/kg). (author)

  14. Integrating job scheduling and constrained network routing

    DEFF Research Database (Denmark)

    Gamst, Mette

    2010-01-01

    This paper examines the NP-hard problem of scheduling jobs on resources such that the overall profit of executed jobs is maximized. Job demand must be sent through a constrained network to the resource before execution can begin. The problem has application in grid computing, where a number...

  15. Discussion on: "Profit Maximization of a Power Plant"

    DEFF Research Database (Denmark)

    Boomsma (fhv. Kristoffersen), Trine Krogh; Fleten, Stein-Erik

    2012-01-01

    Kragelund et al. provides an interesting contribution to operations scheduling in liberalized electricity markets. They address the problem of profit maximization for a power plant participating in the electricity market. In particular, given that the plant has already been dispatched in a day...

  16. Real-time Tumor Oxygenation Changes After Single High-dose Radiation Therapy in Orthotopic and Subcutaneous Lung Cancer in Mice: Clinical Implication for Stereotactic Ablative Radiation Therapy Schedule Optimization

    Energy Technology Data Exchange (ETDEWEB)

    Song, Changhoon [Department of Radiation Oncology, Seoul National University College of Medicine, Seoul (Korea, Republic of); Hong, Beom-Ju; Bok, Seoyeon; Lee, Chan-Ju; Kim, Young-Eun [Division of Integrative Biosciences and Biotechnology, Pohang University of Science and Technology, Pohang, Gyeongbuk (Korea, Republic of); Jeon, Sang-Rok [Department of Radiation Oncology, Seoul National University College of Medicine, Seoul (Korea, Republic of); Cancer Research Institute, Seoul National University College of Medicine, Seoul (Korea, Republic of); Wu, Hong-Gyun [Department of Radiation Oncology, Seoul National University College of Medicine, Seoul (Korea, Republic of); Cancer Research Institute, Seoul National University College of Medicine, Seoul (Korea, Republic of); Institute of Radiation Medicine, Medical Research Center, Seoul National University College of Medicine, Seoul (Korea, Republic of); Lee, Yun-Sang [Department of Nuclear Medicine, Seoul National University College of Medicine, Seoul (Korea, Republic of); Department of Molecular Medicine and Biopharmaceutical Sciences, Seoul National University College of Medicine, Seoul (Korea, Republic of); Cheon, Gi Jeong; Paeng, Jin Chul [Cancer Research Institute, Seoul National University College of Medicine, Seoul (Korea, Republic of); Institute of Radiation Medicine, Medical Research Center, Seoul National University College of Medicine, Seoul (Korea, Republic of); Department of Nuclear Medicine, Seoul National University College of Medicine, Seoul (Korea, Republic of); Carlson, David J. [Department of Therapeutic Radiology, Yale University School of Medicine, New Haven, Connecticut (United States); and others

    2016-07-01

    Purpose: To investigate the serial changes of tumor hypoxia in response to single high-dose irradiation by various clinical and preclinical methods to propose an optimal fractionation schedule for stereotactic ablative radiation therapy. Methods and Materials: Syngeneic Lewis lung carcinomas were grown either orthotopically or subcutaneously in C57BL/6 mice and irradiated with a single dose of 15 Gy to mimic stereotactic ablative radiation therapy used in the clinic. Serial [{sup 18}F]-misonidazole (F-MISO) positron emission tomography (PET) imaging, pimonidazole fluorescence-activated cell sorting analyses, hypoxia-responsive element-driven bioluminescence, and Hoechst 33342 perfusion were performed before irradiation (day −1), at 6 hours (day 0), and 2 (day 2) and 6 (day 6) days after irradiation for both subcutaneous and orthotopic lung tumors. For F-MISO, the tumor/brain ratio was analyzed. Results: Hypoxic signals were too low to quantitate for orthotopic tumors using F-MISO PET or hypoxia-responsive element-driven bioluminescence imaging. In subcutaneous tumors, the maximum tumor/brain ratio was 2.87 ± 0.483 at day −1, 1.67 ± 0.116 at day 0, 2.92 ± 0.334 at day 2, and 2.13 ± 0.385 at day 6, indicating that tumor hypoxia was decreased immediately after irradiation and had returned to the pretreatment levels at day 2, followed by a slight decrease by day 6 after radiation. Pimonidazole analysis also revealed similar patterns. Using Hoechst 33342 vascular perfusion dye, CD31, and cleaved caspase 3 co-immunostaining, we found a rapid and transient vascular collapse, which might have resulted in poor intratumor perfusion of F-MISO PET tracer or pimonidazole delivered at day 0, leading to decreased hypoxic signals at day 0 by PET or pimonidazole analyses. Conclusions: We found tumor hypoxia levels decreased immediately after delivery of a single dose of 15 Gy and had returned to the pretreatment levels 2 days after irradiation and had decreased

  17. Phase I trial of strictly time-scheduled gemcitabine and cisplatin with concurrent radiotherapy in patients with locally advanced pancreatic cancer

    International Nuclear Information System (INIS)

    Brunner, Thomas B.; Grabenbauer, Gerhard G.; Klein, Peter; Baum, Ulrich; Papadopoulos, Thomas; Bautz, Werner; Hohenberger, Werner; Sauer, Rolf

    2003-01-01

    Purpose: Maximal therapeutic gain in xenograft sarcoma and toxicity for jejunal mucosa is time dependent for concurrent gemcitabine and radiotherapy (RT). We used a time-dependent schedule to determine the maximal-tolerated dose and dose-limiting toxicities (DLTs; Grade 4 hematologic or Grade 3 other toxicity). Methods and Materials: Patients with pancreatic cancer (n=33), periampullary carcinoma (n=1), or bile duct cancer (n=2) were treated with 3-day conformal RT with 50.4 Gy (tumor, lymphatics) plus a 5.4-Gy boost. Concurrent cisplatin (20 mg/m 2 /d on Days 1-5 and 29-33) and gemcitabine (initially 600 mg/m 2 , weekly on Fridays 68 h before RT) were administered. Because of DLT, the doses were reduced to 500 mg/m 2 weekly and then 500, 400, or 300 mg/m 2 on Days 2, 5, 26, 33. Results: DLT occurred at all dose levels of gemcitabine >300 mg/m 2 . Fourteen patients were treated at the recommended Phase II dose of gemcitabine (300 mg/m 2 ) without DLT. The response to chemoradiation allowed 10 of 30 initially unresectable patients with primary pancreatic carcinoma to undergo radical surgery, including a complete response in 2 cases. Conclusions: At the recommended Phase II dose, chemoradiation with gemcitabine and cisplatin can be administered safely in pancreatic carcinoma. However, at higher dose levels, toxicity is severe and frequent. Patients with a chance for conversion to resection could benefit from this schedule

  18. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  19. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  20. Optimal OFDMA Downlink Scheduling Under a Control Signaling Cost Constraint

    OpenAIRE

    Larsson, Erik G.

    2010-01-01

    This paper proposes a new algorithm for downlink scheduling in OFDMA systems. The method maximizes the throughput, taking into account the amount of signaling needed to transmit scheduling maps to the users. A combinatorial problem is formulated and solved via a dynamic programming approach reminiscent of the Viterbi algorithm. The total computational complexity of the algorithm is upper boundedby O(K^4N) where K is the number of users that are being considered for scheduling in a frame and N...

  1. Algorithm comparison for schedule optimization in MR fingerprinting.

    Science.gov (United States)

    Cohen, Ouri; Rosen, Matthew S

    2017-09-01

    In MR Fingerprinting, the flip angles and repetition times are chosen according to a pseudorandom schedule. In previous work, we have shown that maximizing the discrimination between different tissue types by optimizing the acquisition schedule allows reductions in the number of measurements required. The ideal optimization algorithm for this application remains unknown, however. In this work we examine several different optimization algorithms to determine the one best suited for optimizing MR Fingerprinting acquisition schedules. Copyright © 2017 Elsevier Inc. All rights reserved.

  2. Maximal Bell's inequality violation for non-maximal entanglement

    International Nuclear Information System (INIS)

    Kobayashi, M.; Khanna, F.; Mann, A.; Revzen, M.; Santana, A.

    2004-01-01

    Bell's inequality violation (BIQV) for correlations of polarization is studied for a product state of two two-mode squeezed vacuum (TMSV) states. The violation allowed is shown to attain its maximal limit for all values of the squeezing parameter, ζ. We show via an explicit example that a state whose entanglement is not maximal allow maximal BIQV. The Wigner function of the state is non-negative and the average value of either polarization is nil

  3. Cost-efficient scheduling of FAST observations

    Science.gov (United States)

    Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi

    2018-03-01

    A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.

  4. Maximally Symmetric Composite Higgs Models.

    Science.gov (United States)

    Csáki, Csaba; Ma, Teng; Shu, Jing

    2017-09-29

    Maximal symmetry is a novel tool for composite pseudo Goldstone boson Higgs models: it is a remnant of an enhanced global symmetry of the composite fermion sector involving a twisting with the Higgs field. Maximal symmetry has far-reaching consequences: it ensures that the Higgs potential is finite and fully calculable, and also minimizes the tuning. We present a detailed analysis of the maximally symmetric SO(5)/SO(4) model and comment on its observational consequences.

  5. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  6. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  7. Principles of maximally classical and maximally realistic quantum ...

    Indian Academy of Sciences (India)

    Principles of maximally classical and maximally realistic quantum mechanics. S M ROY. Tata Institute of Fundamental Research, Homi Bhabha Road, Mumbai 400 005, India. Abstract. Recently Auberson, Mahoux, Roy and Singh have proved a long standing conjecture of Roy and Singh: In 2N-dimensional phase space, ...

  8. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  9. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  10. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  11. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  12. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  13. Distributed-Memory Fast Maximal Independent Set

    Energy Technology Data Exchange (ETDEWEB)

    Kanewala Appuhamilage, Thejaka Amila J.; Zalewski, Marcin J.; Lumsdaine, Andrew

    2017-09-13

    The Maximal Independent Set (MIS) graph problem arises in many applications such as computer vision, information theory, molecular biology, and process scheduling. The growing scale of MIS problems suggests the use of distributed-memory hardware as a cost-effective approach to providing necessary compute and memory resources. Luby proposed four randomized algorithms to solve the MIS problem. All those algorithms are designed focusing on shared-memory machines and are analyzed using the PRAM model. These algorithms do not have direct efficient distributed-memory implementations. In this paper, we extend two of Luby’s seminal MIS algorithms, “Luby(A)” and “Luby(B),” to distributed-memory execution, and we evaluate their performance. We compare our results with the “Filtered MIS” implementation in the Combinatorial BLAS library for two types of synthetic graph inputs.

  14. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  15. Medications for Sleep Schedule Adjustments in Athletes.

    Science.gov (United States)

    Baird, Matthew B; Asif, Irfan M

    Sleep schedule adjustments are common requirements of modern-day athletes. Many nonpharmacologic and pharmacologic strategies exist to facilitate circadian rhythm shifts to maximize alertness and performance during competition. This review summarizes the evidence for commonly used pharmacologic agents and presents recommendations for the sports medicine provider. MEDLINE searches were performed using the following keywords: sleep aids, circadian rhythm adjustment, athletes and sleep, caffeine and sports, melatonin and athletes, and sleep aids and sports. Pertinent articles were extracted and discussed. Clinical review. Level 2. There are very few available studies investigating pharmacologic sleep aids in athletes. Data from studies involving shift workers and airline personnel are more abundant and were used to formulate recommendations and conclusions. Melatonin, caffeine, and nonbenzodiazepine sleep aids have a role in facilitating sleep schedule changes in athletes and maximizing sports performance through sleep enhancement.

  16. Maximizing and customer loyalty: Are maximizers less loyal?

    Directory of Open Access Journals (Sweden)

    Linda Lai

    2011-06-01

    Full Text Available Despite their efforts to choose the best of all available solutions, maximizers seem to be more inclined than satisficers to regret their choices and to experience post-decisional dissonance. Maximizers may therefore be expected to change their decisions more frequently and hence exhibit lower customer loyalty to providers of products and services compared to satisficers. Findings from the study reported here (N = 1978 support this prediction. Maximizers reported significantly higher intentions to switch to another service provider (television provider than satisficers. Maximizers' intentions to switch appear to be intensified and mediated by higher proneness to regret, increased desire to discuss relevant choices with others, higher levels of perceived knowledge of alternatives, and higher ego involvement in the end product, compared to satisficers. Opportunities for future research are suggested.

  17. Implications of maximal Jarlskog invariant and maximal CP violation

    International Nuclear Information System (INIS)

    Rodriguez-Jauregui, E.; Universidad Nacional Autonoma de Mexico

    2001-04-01

    We argue here why CP violating phase Φ in the quark mixing matrix is maximal, that is, Φ=90 . In the Standard Model CP violation is related to the Jarlskog invariant J, which can be obtained from non commuting Hermitian mass matrices. In this article we derive the conditions to have Hermitian mass matrices which give maximal Jarlskog invariant J and maximal CP violating phase Φ. We find that all squared moduli of the quark mixing elements have a singular point when the CP violation phase Φ takes the value Φ=90 . This special feature of the Jarlskog invariant J and the quark mixing matrix is a clear and precise indication that CP violating Phase Φ is maximal in order to let nature treat democratically all of the quark mixing matrix moduli. (orig.)

  18. On Throughput Maximization in Constant Travel-Time Robotic Cells

    OpenAIRE

    Milind Dawande; Chelliah Sriskandarajah; Suresh Sethi

    2002-01-01

    We consider the problem of scheduling operations in bufferless robotic cells that produce identical parts. The objective is to find a cyclic sequence of robot moves that minimizes the long-run average time to produce a part or, equivalently, maximizes the throughput rate. The robot can be moved in simple cycles that produce one unit or, in more complicated cycles, that produce multiple units. Because one-unit cycles are the easiest to understand, implement, and control, they are widely used i...

  19. Phenomenology of maximal and near-maximal lepton mixing

    International Nuclear Information System (INIS)

    Gonzalez-Garcia, M. C.; Pena-Garay, Carlos; Nir, Yosef; Smirnov, Alexei Yu.

    2001-01-01

    The possible existence of maximal or near-maximal lepton mixing constitutes an intriguing challenge for fundamental theories of flavor. We study the phenomenological consequences of maximal and near-maximal mixing of the electron neutrino with other (x=tau and/or muon) neutrinos. We describe the deviations from maximal mixing in terms of a parameter ε(equivalent to)1-2sin 2 θ ex and quantify the present experimental status for |ε| e mixing comes from solar neutrino experiments. We find that the global analysis of solar neutrino data allows maximal mixing with confidence level better than 99% for 10 -8 eV 2 ∼ 2 ∼ -7 eV 2 . In the mass ranges Δm 2 ∼>1.5x10 -5 eV 2 and 4x10 -10 eV 2 ∼ 2 ∼ -7 eV 2 the full interval |ε| e mixing in atmospheric neutrinos, supernova neutrinos, and neutrinoless double beta decay

  20. Maximal quantum Fisher information matrix

    International Nuclear Information System (INIS)

    Chen, Yu; Yuan, Haidong

    2017-01-01

    We study the existence of the maximal quantum Fisher information matrix in the multi-parameter quantum estimation, which bounds the ultimate precision limit. We show that when the maximal quantum Fisher information matrix exists, it can be directly obtained from the underlying dynamics. Examples are then provided to demonstrate the usefulness of the maximal quantum Fisher information matrix by deriving various trade-off relations in multi-parameter quantum estimation and obtaining the bounds for the scalings of the precision limit. (paper)

  1. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  2. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  3. Maximize x(a - x)

    Science.gov (United States)

    Lange, L. H.

    1974-01-01

    Five different methods for determining the maximizing condition for x(a - x) are presented. Included is the ancient Greek version and a method attributed to Fermat. None of the proofs use calculus. (LS)

  4. Finding Maximal Quasiperiodicities in Strings

    DEFF Research Database (Denmark)

    Brodal, Gerth Stølting; Pedersen, Christian N. S.

    2000-01-01

    of length n in time O(n log n) and space O(n). Our algorithm uses the suffix tree as the fundamental data structure combined with efficient methods for merging and performing multiple searches in search trees. Besides finding all maximal quasiperiodic substrings, our algorithm also marks the nodes......Apostolico and Ehrenfeucht defined the notion of a maximal quasiperiodic substring and gave an algorithm that finds all maximal quasiperiodic substrings in a string of length n in time O(n log2 n). In this paper we give an algorithm that finds all maximal quasiperiodic substrings in a string...... in the suffix tree that have a superprimitive path-label....

  5. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  6. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  7. On the maximal diphoton width

    CERN Document Server

    Salvio, Alberto; Strumia, Alessandro; Urbano, Alfredo

    2016-01-01

    Motivated by the 750 GeV diphoton excess found at LHC, we compute the maximal width into $\\gamma\\gamma$ that a neutral scalar can acquire through a loop of charged fermions or scalars as function of the maximal scale at which the theory holds, taking into account vacuum (meta)stability bounds. We show how an extra gauge symmetry can qualitatively weaken such bounds, and explore collider probes and connections with Dark Matter.

  8. Impact of interference on the performance of selection based parallel multiuser scheduling

    KAUST Repository

    Nam, Sungsik

    2012-02-01

    In conventional multiuser parallel scheduling schemes, every scheduled user is interfering with every other scheduled user, which limits the capacity and performance of multiuser systems, and the level of interference becomes substantial as the number of scheduled users increases. Based on the above observations, we investigate the trade-off between the system throughput and the number of scheduled users through the exact analysis of the total average sum rate capacity and the average spectral efficiency. Our analytical results can help the system designer to carefully select the appropriate number of scheduled users to maximize the overall throughput while maintaining an acceptable quality of service under certain channel conditions. © 2012 IEEE.

  9. Fewer intensive care unit refusals and a higher capacity utilization by using a cyclic surgical case schedule

    NARCIS (Netherlands)

    van Houdenhoven, Mark; van Oostrum, Jeroen M.; Wullink, Gerhard; Hans, Elias W.; Hurink, Johann L.; Bakker, Jan; Kazemier, Geert

    Purpose: Mounting health care costs force hospital managers to maximize utilization of scarce resources and simultaneously improve access to hospital services. This article assesses the benefits of a cyclic case scheduling approach that exploits a master surgical schedule (MSS). An MSS maximizes

  10. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  11. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  12. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  13. Maximization

    Directory of Open Access Journals (Sweden)

    A. Garmroodi Asil

    2017-09-01

    To further reduce the sulfur dioxide emission of the entire refining process, two scenarios of acid gas or air preheats are investigated when either of them is used simultaneously with the third enrichment scheme. The maximum overall sulfur recovery efficiency and highest combustion chamber temperature is slightly higher for acid gas preheats but air preheat is more favorable because it is more benign. To the best of our knowledge, optimization of the entire GTU + enrichment section and SRU processes has not been addressed previously.

  14. Maximizing Entropy over Markov Processes

    DEFF Research Database (Denmark)

    Biondi, Fabrizio; Legay, Axel; Nielsen, Bo Friis

    2013-01-01

    The channel capacity of a deterministic system with confidential data is an upper bound on the amount of bits of data an attacker can learn from the system. We encode all possible attacks to a system using a probabilistic specification, an Interval Markov Chain. Then the channel capacity...... as a reward function, a polynomial algorithm to verify the existence of an system maximizing entropy among those respecting a specification, a procedure for the maximization of reward functions over Interval Markov Chains and its application to synthesize an implementation maximizing entropy. We show how...... to use Interval Markov Chains to model abstractions of deterministic systems with confidential data, and use the above results to compute their channel capacity. These results are a foundation for ongoing work on computing channel capacity for abstractions of programs derived from code....

  15. Maximizing entropy over Markov processes

    DEFF Research Database (Denmark)

    Biondi, Fabrizio; Legay, Axel; Nielsen, Bo Friis

    2014-01-01

    The channel capacity of a deterministic system with confidential data is an upper bound on the amount of bits of data an attacker can learn from the system. We encode all possible attacks to a system using a probabilistic specification, an Interval Markov Chain. Then the channel capacity...... as a reward function, a polynomial algorithm to verify the existence of a system maximizing entropy among those respecting a specification, a procedure for the maximization of reward functions over Interval Markov Chains and its application to synthesize an implementation maximizing entropy. We show how...... to use Interval Markov Chains to model abstractions of deterministic systems with confidential data, and use the above results to compute their channel capacity. These results are a foundation for ongoing work on computing channel capacity for abstractions of programs derived from code. © 2014 Elsevier...

  16. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  17. Chamaebatiaria millefolium (Torr.) Maxim.: fernbush

    Science.gov (United States)

    Nancy L. Shaw; Emerenciana G. Hurd

    2008-01-01

    Fernbush - Chamaebatiaria millefolium (Torr.) Maxim. - the only species in its genus, is endemic to the Great Basin, Colorado Plateau, and adjacent areas of the western United States. It is an upright, generally multistemmed, sweetly aromatic shrub 0.3 to 2 m tall. Bark of young branches is brown and becomes smooth and gray with age. Leaves are leathery, alternate,...

  18. Phase III trial of two investigational schedules of ifosfamide compared with standard-dose doxorubicin in advanced or metastatic soft tissue sarcoma: a European Organisation for Research and Treatment of Cancer Soft Tissue and Bone Sarcoma Group Study

    NARCIS (Netherlands)

    Lorigan, Paul; Verweij, Jaap; Papai, Zsuzsa; Rodenhuis, Sjoerd; Le Cesne, Axel; Leahy, Michael G.; Radford, John A.; van Glabbeke, Martine M.; Kirkpatrick, Anne; Hogendoorn, Pancras C. W.; Blay, Jean-Yves

    2007-01-01

    PURPOSE: Single-agent doxorubicin remains the standard treatment for advanced soft tissue sarcomas. Combining doxorubicin with standard-dose ifosfamide has not been shown to improve survival and is associated with a significantly increased toxicity; it is not known whether higher dose single-agent

  19. Joint opportunistic scheduling and network coding for bidirectional relay channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-07-01

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users\\' transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited. © 2013 IEEE.

  20. Job Scheduling with Efficient Resource Monitoring in Cloud Datacenter

    Directory of Open Access Journals (Sweden)

    Shyamala Loganathan

    2015-01-01

    Full Text Available Cloud computing is an on-demand computing model, which uses virtualization technology to provide cloud resources to users in the form of virtual machines through internet. Being an adaptable technology, cloud computing is an excellent alternative for organizations for forming their own private cloud. Since the resources are limited in these private clouds maximizing the utilization of resources and giving the guaranteed service for the user are the ultimate goal. For that, efficient scheduling is needed. This research reports on an efficient data structure for resource management and resource scheduling technique in a private cloud environment and discusses a cloud model. The proposed scheduling algorithm considers the types of jobs and the resource availability in its scheduling decision. Finally, we conducted simulations using CloudSim and compared our algorithm with other existing methods, like V-MCT and priority scheduling algorithms.

  1. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  2. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  3. CERN confirms LHC schedule

    CERN Document Server

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  4. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  5. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  6. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  7. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  8. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  9. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  10. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  11. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  12. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  13. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  14. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  15. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  16. A feasibility study: Selection of a personalized radiotherapy fractionation schedule using spatiotemporal optimization

    International Nuclear Information System (INIS)

    Kim, Minsun; Stewart, Robert D.; Phillips, Mark H.

    2015-01-01

    Purpose: To investigate the impact of using spatiotemporal optimization, i.e., intensity-modulated spatial optimization followed by fractionation schedule optimization, to select the patient-specific fractionation schedule that maximizes the tumor biologically equivalent dose (BED) under dose constraints for multiple organs-at-risk (OARs). Methods: Spatiotemporal optimization was applied to a variety of lung tumors in a phantom geometry using a range of tumor sizes and locations. The optimal fractionation schedule for a patient using the linear-quadratic cell survival model depends on the tumor and OAR sensitivity to fraction size (α/β), the effective tumor doubling time (T d ), and the size and location of tumor target relative to one or more OARs (dose distribution). The authors used a spatiotemporal optimization method to identify the optimal number of fractions N that maximizes the 3D tumor BED distribution for 16 lung phantom cases. The selection of the optimal fractionation schedule used equivalent (30-fraction) OAR constraints for the heart (D mean ≤ 45 Gy), lungs (D mean ≤ 20 Gy), cord (D max ≤ 45 Gy), esophagus (D max ≤ 63 Gy), and unspecified tissues (D 05 ≤ 60 Gy). To assess plan quality, the authors compared the minimum, mean, maximum, and D 95 of tumor BED, as well as the equivalent uniform dose (EUD) for optimized plans to conventional intensity-modulated radiation therapy plans prescribing 60 Gy in 30 fractions. A sensitivity analysis was performed to assess the effects of T d (3–100 days), tumor lag-time (T k = 0–10 days), and the size of tumors on optimal fractionation schedule. Results: Using an α/β ratio of 10 Gy, the average values of tumor max, min, mean BED, and D 95 were up to 19%, 21%, 20%, and 19% larger than those from conventional prescription, depending on T d and T k used. Tumor EUD was up to 17% larger than the conventional prescription. For fast proliferating tumors with T d less than 10 days, there was no

  17. A feasibility study: Selection of a personalized radiotherapy fractionation schedule using spatiotemporal optimization

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Minsun, E-mail: mk688@uw.edu; Stewart, Robert D. [Department of Radiation Oncology, University of Washington, Seattle, Washington 98195-6043 (United States); Phillips, Mark H. [Departments of Radiation Oncology and Neurological Surgery, University of Washington, Seattle, Washington 98195-6043 (United States)

    2015-11-15

    Purpose: To investigate the impact of using spatiotemporal optimization, i.e., intensity-modulated spatial optimization followed by fractionation schedule optimization, to select the patient-specific fractionation schedule that maximizes the tumor biologically equivalent dose (BED) under dose constraints for multiple organs-at-risk (OARs). Methods: Spatiotemporal optimization was applied to a variety of lung tumors in a phantom geometry using a range of tumor sizes and locations. The optimal fractionation schedule for a patient using the linear-quadratic cell survival model depends on the tumor and OAR sensitivity to fraction size (α/β), the effective tumor doubling time (T{sub d}), and the size and location of tumor target relative to one or more OARs (dose distribution). The authors used a spatiotemporal optimization method to identify the optimal number of fractions N that maximizes the 3D tumor BED distribution for 16 lung phantom cases. The selection of the optimal fractionation schedule used equivalent (30-fraction) OAR constraints for the heart (D{sub mean} ≤ 45 Gy), lungs (D{sub mean} ≤ 20 Gy), cord (D{sub max} ≤ 45 Gy), esophagus (D{sub max} ≤ 63 Gy), and unspecified tissues (D{sub 05} ≤ 60 Gy). To assess plan quality, the authors compared the minimum, mean, maximum, and D{sub 95} of tumor BED, as well as the equivalent uniform dose (EUD) for optimized plans to conventional intensity-modulated radiation therapy plans prescribing 60 Gy in 30 fractions. A sensitivity analysis was performed to assess the effects of T{sub d} (3–100 days), tumor lag-time (T{sub k} = 0–10 days), and the size of tumors on optimal fractionation schedule. Results: Using an α/β ratio of 10 Gy, the average values of tumor max, min, mean BED, and D{sub 95} were up to 19%, 21%, 20%, and 19% larger than those from conventional prescription, depending on T{sub d} and T{sub k} used. Tumor EUD was up to 17% larger than the conventional prescription. For fast proliferating

  18. On the Integrated Job Scheduling and Constrained Network Routing Problem

    DEFF Research Database (Denmark)

    Gamst, Mette

    This paper examines the NP-hard problem of scheduling a number of jobs on a finite set of machines such that the overall profit of executed jobs is maximized. Each job demands a number of resources, which must be sent to the executing machine via constrained paths. Furthermore, two resource demand...

  19. A note on simulated annealing to computer laboratory scheduling ...

    African Journals Online (AJOL)

    The concepts, principles and implementation of simulated Annealing as a modem heuristic technique is presented. Simulated Annealing algorithm is used in solving real life problem of Computer Laboratory scheduling in order to maximize the use of scarce and insufficient resources. KEY WORDS: Simulated Annealing ...

  20. IMNN: Information Maximizing Neural Networks

    Science.gov (United States)

    Charnock, Tom; Lavaux, Guilhem; Wandelt, Benjamin D.

    2018-04-01

    This software trains artificial neural networks to find non-linear functionals of data that maximize Fisher information: information maximizing neural networks (IMNNs). As compressing large data sets vastly simplifies both frequentist and Bayesian inference, important information may be inadvertently missed. Likelihood-free inference based on automatically derived IMNN summaries produces summaries that are good approximations to sufficient statistics. IMNNs are robustly capable of automatically finding optimal, non-linear summaries of the data even in cases where linear compression fails: inferring the variance of Gaussian signal in the presence of noise, inferring cosmological parameters from mock simulations of the Lyman-α forest in quasar spectra, and inferring frequency-domain parameters from LISA-like detections of gravitational waveforms. In this final case, the IMNN summary outperforms linear data compression by avoiding the introduction of spurious likelihood maxima.

  1. Is the β phase maximal?

    International Nuclear Information System (INIS)

    Ferrandis, Javier

    2005-01-01

    The current experimental determination of the absolute values of the CKM elements indicates that 2 vertical bar V ub /V cb V us vertical bar =(1-z), with z given by z=0.19+/-0.14. This fact implies that irrespective of the form of the quark Yukawa matrices, the measured value of the SM CP phase β is approximately the maximum allowed by the measured absolute values of the CKM elements. This is β=(π/6-z/3) for γ=(π/3+z/3), which implies α=π/2. Alternatively, assuming that β is exactly maximal and using the experimental measurement sin(2β)=0.726+/-0.037, the phase γ is predicted to be γ=(π/2-β)=66.3 o +/-1.7 o . The maximality of β, if confirmed by near-future experiments, may give us some clues as to the origin of CP violation

  2. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  3. Scalable Nonlinear AUC Maximization Methods

    OpenAIRE

    Khalid, Majdi; Ray, Indrakshi; Chitsaz, Hamidreza

    2017-01-01

    The area under the ROC curve (AUC) is a measure of interest in various machine learning and data mining applications. It has been widely used to evaluate classification performance on heavily imbalanced data. The kernelized AUC maximization machines have established a superior generalization ability compared to linear AUC machines because of their capability in modeling the complex nonlinear structure underlying most real world-data. However, the high training complexity renders the kernelize...

  4. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  5. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  6. FLOUTING MAXIMS IN INDONESIA LAWAK KLUB CONVERSATION

    Directory of Open Access Journals (Sweden)

    Rahmawati Sukmaningrum

    2017-04-01

    Full Text Available This study aims to identify the types of maxims flouted in the conversation in famous comedy show, Indonesia Lawak Club. Likewise, it also tries to reveal the speakers‘ intention of flouting the maxim in the conversation during the show. The writers use descriptive qualitative method in conducting this research. The data is taken from the dialogue of Indonesia Lawak club and then analyzed based on Grice‘s cooperative principles. The researchers read the dialogue‘s transcripts, identify the maxims, and interpret the data to find the speakers‘ intention for flouting the maxims in the communication. The results show that there are four types of maxims flouted in the dialogue. Those are maxim of quality (23%, maxim of quantity (11%, maxim of manner (31%, and maxim of relevance (35. Flouting the maxims in the conversations is intended to make the speakers feel uncomfortable with the conversation, show arrogances, show disagreement or agreement, and ridicule other speakers.

  7. Dynamic scheduling and analysis of real time systems with multiprocessors

    Directory of Open Access Journals (Sweden)

    M.D. Nashid Anjum

    2016-08-01

    Full Text Available This research work considers a scenario of cloud computing job-shop scheduling problems. We consider m realtime jobs with various lengths and n machines with different computational speeds and costs. Each job has a deadline to be met, and the profit of processing a packet of a job differs from other jobs. Moreover, considered deadlines are either hard or soft and a penalty is applied if a deadline is missed where the penalty is considered as an exponential function of time. The scheduling problem has been formulated as a mixed integer non-linear programming problem whose objective is to maximize net-profit. The formulated problem is computationally hard and not solvable in deterministic polynomial time. This research work proposes an algorithm named the Tube-tap algorithm as a solution to this scheduling optimization problem. Extensive simulation shows that the proposed algorithm outperforms existing solutions in terms of maximizing net-profit and preserving deadlines.

  8. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  9. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  10. Intensity-Modulated Radiotherapy for Locally Advanced Non-Small-Cell Lung Cancer: A Dose-Escalation Planning Study

    International Nuclear Information System (INIS)

    Lievens, Yolande; Nulens, An; Gaber, Mousa Amr; Defraene, Gilles; De Wever, Walter; Stroobants, Sigrid; Van den Heuvel, Frank

    2011-01-01

    Purpose: To evaluate the potential for dose escalation with intensity-modulated radiotherapy (IMRT) in positron emission tomography-based radiotherapy planning for locally advanced non-small-cell lung cancer (LA-NSCLC). Methods and Materials: For 35 LA-NSCLC patients, three-dimensional conformal radiotherapy and IMRT plans were made to a prescription dose (PD) of 66 Gy in 2-Gy fractions. Dose escalation was performed toward the maximal PD using secondary endpoint constraints for the lung, spinal cord, and heart, with de-escalation according to defined esophageal tolerance. Dose calculation was performed using the Eclipse pencil beam algorithm, and all plans were recalculated using a collapsed cone algorithm. The normal tissue complication probabilities were calculated for the lung (Grade 2 pneumonitis) and esophagus (acute toxicity, grade 2 or greater, and late toxicity). Results: IMRT resulted in statistically significant decreases in the mean lung (p <.0001) and maximal spinal cord (p = .002 and 0005) doses, allowing an average increase in the PD of 8.6-14.2 Gy (p ≤.0001). This advantage was lost after de-escalation within the defined esophageal dose limits. The lung normal tissue complication probabilities were significantly lower for IMRT (p <.0001), even after dose escalation. For esophageal toxicity, IMRT significantly decreased the acute NTCP values at the low dose levels (p = .0009 and p <.0001). After maximal dose escalation, late esophageal tolerance became critical (p <.0001), especially when using IMRT, owing to the parallel increases in the esophageal dose and PD. Conclusion: In LA-NSCLC, IMRT offers the potential to significantly escalate the PD, dependent on the lung and spinal cord tolerance. However, parallel increases in the esophageal dose abolished the advantage, even when using collapsed cone algorithms. This is important to consider in the context of concomitant chemoradiotherapy schedules using IMRT.

  11. A new mathematical programming model for long-term production scheduling considering geological uncertainty

    OpenAIRE

    Gholamnejad, J.; Moosavi, E.

    2012-01-01

    Determination of the optimum production schedules over the life of a mine is a critical mechanism in open pit mine planning procedures. Long-term production scheduling is used to maximize the net present value of the project under technical, financial, and environmental constraints. Mathematical programming models are well suited for optimizing long-term production schedules of open pit mines. There are two approaches to solving long-term production problems: deterministic- and uncertainty- b...

  12. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  13. SU-F-19A-08: Optimal Time Release Schedule of In-Situ Drug Release During Permanent Prostate Brachytherapy

    International Nuclear Information System (INIS)

    Cormack, R; Ngwa, W; Makrigiorgos, G; Tangutoori, S; Rajiv, K; Sridhar, S

    2014-01-01

    Purpose: Permanent prostate brachytherapy spacers can be used to deliver sustained doses of radiosentitizing drug directly to the target, in order to enhance the radiation effect. Implantable nanoplatforms for chemo-radiation therapy (INCeRTs) have a maximum drug capacity and can be engineered to control the drug release schedule. The optimal schedule for sensitization during continuous low dose rate irradiation is unknown. This work studies the optimal release schedule of drug for both traditional sensitizers, and those that work by suppressing DNA repair processes. Methods: Six brachytherapy treatment plans were used to model the anatomy, implant geometry and calculate the spatial distribution of radiation dose and drug concentrations for a range of drug diffusion parameters. Three state partial differential equations (cells healthy, damaged or dead) modeled the effect of continuous radiation (radiosensitivities α,β) and cellular repair (time tr) on a cell population. Radiosensitization was modeled as concentration dependent change in α,β or tr which with variable duration under the constraint of fixed total drug release. Average cell kill was used to measure effectiveness. Sensitization by means of both enhanced damage and reduced repair were studied. Results: Optimal release duration is dependent on the concentration of radiosensitizer compared to the saturation concentration (csat) above which additional sensitization does not occur. Long duration drug release when enhancing α or β maximizes cell death when drug concentrations are generally over csat. Short term release is optimal for concentrations below saturation. Sensitization by suppressing repair has a similar though less distinct trend that is more affected by the radiation dose distribution. Conclusion: Models of sustained local radiosensitization show potential to increase the effectiveness of radiation in permanent prostate brachytherapy. INCeRTs with high drug capacity produce the greatest

  14. On program restructuring, scheduling, and communication for parallel processor systems

    Energy Technology Data Exchange (ETDEWEB)

    Polychronopoulos, Constantine D. [Univ. of Illinois, Urbana, IL (United States)

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, these algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented.

  15. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  16. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  17. The application of artificial intelligence to astronomical scheduling problems

    Science.gov (United States)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  18. Maximal Abelian sets of roots

    CERN Document Server

    Lawther, R

    2018-01-01

    In this work the author lets \\Phi be an irreducible root system, with Coxeter group W. He considers subsets of \\Phi which are abelian, meaning that no two roots in the set have sum in \\Phi \\cup \\{ 0 \\}. He classifies all maximal abelian sets (i.e., abelian sets properly contained in no other) up to the action of W: for each W-orbit of maximal abelian sets we provide an explicit representative X, identify the (setwise) stabilizer W_X of X in W, and decompose X into W_X-orbits. Abelian sets of roots are closely related to abelian unipotent subgroups of simple algebraic groups, and thus to abelian p-subgroups of finite groups of Lie type over fields of characteristic p. Parts of the work presented here have been used to confirm the p-rank of E_8(p^n), and (somewhat unexpectedly) to obtain for the first time the 2-ranks of the Monster and Baby Monster sporadic groups, together with the double cover of the latter. Root systems of classical type are dealt with quickly here; the vast majority of the present work con...

  19. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  20. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  1. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  2. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  3. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  4. The Effect of Different Dosing Schedules of Intravitreal Sirolimus, a Mammalian Target of Rapamycin (mTOR) Inhibitor, in the Treatment of Non-Infectious Uveitis (An American Ophthalmological Society Thesis).

    Science.gov (United States)

    Nguyen, Quan Dong; Sadiq, Mohammad Ali; Soliman, Mohamed Kamel; Agarwal, Aniruddha; Do, Diana V; Sepah, Yasir J

    2016-08-01

    To determine if two different doses of intravitreal sirolimus, an mTOR inhibitor, can decrease inflammation and is safe in eyes with non-infectious posterior, intermediate, or panuveitis in the Sirolimus as a Therapeutic Approach UVEitis: Protocol-2 (SAVE-2) Study. SAVE-2 is a prospective randomized, phase II, open-label interventional clinical trial conducted at 4 clinical centers in the United States. Eligible subjects were randomized into one of two treatments. Group 1 received 440µg of intravitreal sirolimus in study eyes on days 0, 30, 60, 90, 120, and 150; group 2 received 880µg of intravitreal sirolimus on days 0, 60, and 120. Fellow eyes were also eligible to receive sirolimus (of opposite dose to that of study eye). Primary endpoint of the study was at month 6 (M6). 24 subjects have been randomized in SAVE-2 and are included in the analysis. Vitreous haze decreased by ≥2 steps in 63.6% and 50% of patients in groups 1 and 2, respectively at M6 (p=0.695). Mean change in best-corrected visual acuity for subjects was +3.66 and -2.91 ETDRS letters in group 1 and 2, respectively. Among subjects with macular edema at baseline (n=13), the mean change in foveal thickness was -89.42µm in group 1 and +81.5µm in group 2 at M6. Both low and high doses of intravitreal sirolimus were found to decrease vitreous haze in eyes with non-infectious uveitis. Low dose (440µg) sirolimus administered monthly may be more efficacious in reducing uveitic macular edema than high dose (880µg) administered every 2 months.

  5. Maximizing benefits from resource development

    International Nuclear Information System (INIS)

    Skjelbred, B.

    2002-01-01

    The main objectives of Norwegian petroleum policy are to maximize the value creation for the country, develop a national oil and gas industry, and to be at the environmental forefront of long term resource management and coexistence with other industries. The paper presents a graph depicting production and net export of crude oil for countries around the world for 2002. Norway produced 3.41 mill b/d and exported 3.22 mill b/d. Norwegian petroleum policy measures include effective regulation and government ownership, research and technology development, and internationalisation. Research and development has been in five priority areas, including enhanced recovery, environmental protection, deep water recovery, small fields, and the gas value chain. The benefits of internationalisation includes capitalizing on Norwegian competency, exploiting emerging markets and the assurance of long-term value creation and employment. 5 figs

  6. Maximizing synchronizability of duplex networks

    Science.gov (United States)

    Wei, Xiang; Emenheiser, Jeffrey; Wu, Xiaoqun; Lu, Jun-an; D'Souza, Raissa M.

    2018-01-01

    We study the synchronizability of duplex networks formed by two randomly generated network layers with different patterns of interlayer node connections. According to the master stability function, we use the smallest nonzero eigenvalue and the eigenratio between the largest and the second smallest eigenvalues of supra-Laplacian matrices to characterize synchronizability on various duplexes. We find that the interlayer linking weight and linking fraction have a profound impact on synchronizability of duplex networks. The increasingly large inter-layer coupling weight is found to cause either decreasing or constant synchronizability for different classes of network dynamics. In addition, negative node degree correlation across interlayer links outperforms positive degree correlation when most interlayer links are present. The reverse is true when a few interlayer links are present. The numerical results and understanding based on these representative duplex networks are illustrative and instructive for building insights into maximizing synchronizability of more realistic multiplex networks.

  7. VIOLATION OF CONVERSATION MAXIM ON TV ADVERTISEMENTS

    Directory of Open Access Journals (Sweden)

    Desak Putu Eka Pratiwi

    2015-07-01

    Full Text Available Maxim is a principle that must be obeyed by all participants textually and interpersonally in order to have a smooth communication process. Conversation maxim is divided into four namely maxim of quality, maxim of quantity, maxim of relevance, and maxim of manner of speaking. Violation of the maxim may occur in a conversation in which the information the speaker has is not delivered well to his speaking partner. Violation of the maxim in a conversation will result in an awkward impression. The example of violation is the given information that is redundant, untrue, irrelevant, or convoluted. Advertisers often deliberately violate the maxim to create unique and controversial advertisements. This study aims to examine the violation of maxims in conversations of TV ads. The source of data in this research is food advertisements aired on TV media. Documentation and observation methods are applied to obtain qualitative data. The theory used in this study is a maxim theory proposed by Grice (1975. The results of the data analysis are presented with informal method. The results of this study show an interesting fact that the violation of maxim in a conversation found in the advertisement exactly makes the advertisements very attractive and have a high value.

  8. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  9. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  10. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  11. Multiresource allocation and scheduling for periodic soft real-time applications

    Science.gov (United States)

    Gopalan, Kartik; Chiueh, Tzi-cker

    2001-12-01

    Real-time applications that utilize multiple system resources, such as CPU, disks, and network links, require coordinated scheduling of these resources in order to meet their end-to-end performance requirements. Most state-of-the-art operating systems support independent resource allocation and deadline-driven scheduling but lack coordination among multiple heterogeneous resources. This paper describes the design and implementation of an Integrated Real-time Resource Scheduler (IRS) that performs coordinated allocation and scheduling of multiple heterogeneous resources on the same machine for periodic soft real-time application. The principal feature of IRS is a heuristic multi-resource allocation algorithm that reserves multiple resources for real-time applications in a manner that can maximize the number of applications admitted into the system in the long run. At run-time, a global scheduler dispatches the tasks of the soft real-time application to individual resource schedulers according to the precedence constraints between tasks. The individual resource schedulers, which could be any deadline based schedulers, can make scheduling decisions locally and yet collectively satisfy a real-time application's performance requirements. The tightness of overall timing guarantees is ultimately determined by the properties of individual resource schedulers. However, IRS maximizes overall system resource utilization efficiency by coordinating deadline assignment across multiple tasks in a soft real-time application.

  12. Scheduling Aircraft Landings under Constrained Position Shifting

    Science.gov (United States)

    Balakrishnan, Hamsa; Chandran, Bala

    2006-01-01

    Optimal scheduling of airport runway operations can play an important role in improving the safety and efficiency of the National Airspace System (NAS). Methods that compute the optimal landing sequence and landing times of aircraft must accommodate practical issues that affect the implementation of the schedule. One such practical consideration, known as Constrained Position Shifting (CPS), is the restriction that each aircraft must land within a pre-specified number of positions of its place in the First-Come-First-Served (FCFS) sequence. We consider the problem of scheduling landings of aircraft in a CPS environment in order to maximize runway throughput (minimize the completion time of the landing sequence), subject to operational constraints such as FAA-specified minimum inter-arrival spacing restrictions, precedence relationships among aircraft that arise either from airline preferences or air traffic control procedures that prevent overtaking, and time windows (representing possible control actions) during which each aircraft landing can occur. We present a Dynamic Programming-based approach that scales linearly in the number of aircraft, and describe our computational experience with a prototype implementation on realistic data for Denver International Airport.

  13. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  14. Maximization of bremsstrahlung and K-series production efficiencies in flash x-ray tubes

    International Nuclear Information System (INIS)

    Krehl, P.

    1986-01-01

    Historically, x-ray output of flash x-ray tubes was maximized empirically by changing the electrode geometry and varying the capacitance of the pulse generator. With the advent of high-voltage, low-impedance transmission lines, short-duration, high-current pulses could be generated with ease. An appropriate line scaling should assure that dose maximization is not reached at the expense of pulse prolongation which would reduce stop motion capability, but rather that dose rate should be maximized. Additionally, anode evaporation in the arc phase should be minimized to enhance tube life

  15. Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: A dynamic forward approach

    Directory of Open Access Journals (Sweden)

    Aidin Delgoshaei

    2016-09-01

    Full Text Available Purpose: The issue resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating drawback is frequently seen after scheduling of a project in practice which causes a schedule to be useless. Modifying an over-allocated schedule is very complicated and needs a lot of efforts and time. In this paper, a new and fast tracking method is proposed to schedule large scale projects which can help project engineers to schedule the project rapidly and with more confidence. Design/methodology/approach: In this article, a forward approach for maximizing net present value (NPV in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF is proposed. The progress payment method is used and all resources are considered as pre-emptible. The proposed approach maximizes NPV using unscheduled resources through resource calendar in forward mode. For this purpose, a Genetic Algorithm is applied to solve. Findings: The findings show that the proposed method is an effective way to maximize NPV in MRCPSP-DCF problems while activity splitting is allowed. The proposed algorithm is very fast and can schedule experimental cases with 1000 variables and 100 resources in few seconds. The results are then compared with branch and bound method and simulated annealing algorithm and it is found the proposed genetic algorithm can provide results with better quality. Then algorithm is then applied for scheduling a hospital in practice. Originality/value: The method can be used alone or as a macro in Microsoft Office Project® Software to schedule MRCPSP-DCF problems or to modify resource over-allocated activities after scheduling a project. This can help project engineers to schedule project activities rapidly with more accuracy in practice.

  16. Maximizing ROI (return on information)

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, B.

    2000-05-01

    The role and importance of managing information are discussed, underscoring the importance by quoting from the report of the International Data Corporation, according to which Fortune 500 companies lost $ 12 billion in 1999 due to inefficiencies resulting from intellectual re-work, substandard performance , and inability to find knowledge resources. The report predicts that this figure will rise to $ 31.5 billion by 2003. Key impediments to implementing knowledge management systems are identified as : the cost and human resources requirement of deployment; inflexibility of historical systems to adapt to change; and the difficulty of achieving corporate acceptance of inflexible software products that require changes in 'normal' ways of doing business. The author recommends the use of model, document and rule-independent systems with a document centered interface (DCI), employing rapid application development (RAD) and object technologies and visual model development, which eliminate these problems, making it possible for companies to maximize their return on information (ROI), and achieve substantial savings in implementation costs.

  17. Maximizing the optical network capacity.

    Science.gov (United States)

    Bayvel, Polina; Maher, Robert; Xu, Tianhua; Liga, Gabriele; Shevchenko, Nikita A; Lavery, Domaniç; Alvarado, Alex; Killey, Robert I

    2016-03-06

    Most of the digital data transmitted are carried by optical fibres, forming the great part of the national and international communication infrastructure. The information-carrying capacity of these networks has increased vastly over the past decades through the introduction of wavelength division multiplexing, advanced modulation formats, digital signal processing and improved optical fibre and amplifier technology. These developments sparked the communication revolution and the growth of the Internet, and have created an illusion of infinite capacity being available. But as the volume of data continues to increase, is there a limit to the capacity of an optical fibre communication channel? The optical fibre channel is nonlinear, and the intensity-dependent Kerr nonlinearity limit has been suggested as a fundamental limit to optical fibre capacity. Current research is focused on whether this is the case, and on linear and nonlinear techniques, both optical and electronic, to understand, unlock and maximize the capacity of optical communications in the nonlinear regime. This paper describes some of them and discusses future prospects for success in the quest for capacity. © 2016 The Authors.

  18. Dose measurements in mammography

    International Nuclear Information System (INIS)

    Kainberger, F.; Kallinger, W.

    1977-01-01

    Dose measurements at the mamma during mammography were carried out in the form of direct measurement with thermoluminescent dosimetry. Measurement was done for the in- and outcoming doses at the mamma, the dose exposure of the sternal region and the scattered rays above the symphysis, the latter as parameter for the genetic radiation exposure. As expected, the dose of the smooth radiation used for mammography showed a strong decrease at the outcome point in comparison with the income point. Surprisingly high was the scattered radiation in the sternal region. A corresponding protection by lead plates could be taken into consideration. Extremely low is the scattered radiation above the symphysis. Even measurements with the very sensitive calcium fluoride dosimeters did not reveal any practically important dose in the symphysis region. Most measurement values remained below the determinable dose of 0.3mR. Some maximal values varied in the range of 3-1 mR. (orig.) [de

  19. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  20. [The effect of aluminum adjuvant and immunization schedule on immunogenicity of Sabin inactivated poliovirus vaccine].

    Science.gov (United States)

    Wang, Fang; Zhang, Ming; Xie, Bing-Feng; Cao, Han; Tong, Shao-Yong; Wang, Jun-Rong; Yu, Xiao-Ping; Tang, Yang; Yang, Jing-Ran; Sun, Ming-Bo

    2013-04-01

    To study the effect of aluminume adjuvant and immunization schedule on immunogenicity of Sabin inactivated poliovirus vaccine. Four batches of Sabin IPV were produced by different concentrations of type 1, 2, and 3 poliovirus and administrated on three-dose schedule at 0, 1, 2 months and 0, 2, 4 months on rats. Serum samples were collected one month after each dose and neutralizing antibody titers against three types poliovirus were determined by micro-neutralization assay. The GMTs of neutralizing antibodies against three types poliovirus increased significantly and the seropositivity rates were 100% in all groups after 3 doses. There was no significant difference between two immunization schedules, and the 0, 2, 4 month schedule could induce higher level neutralizing antibody compared to the 0, 1, 2 month schedule. The groups with aluminum adjuvant could induce higher level neutralizing antibody compared to the groups without adjuvant. Aluminum djuvant and immunization schedule could improve the immunogenicity of Sabin IPV.

  1. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  2. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  3. Schedules for Regulatory Regimes

    International Nuclear Information System (INIS)

    Austvik, Ole Gunnar

    2003-01-01

    The idea of regulating transporters' terms of operations is that if the market itself does not produce optimal outcomes, then it can be mimicked to do so through regulatory and other public instruments. The first-best solution could be a subsidized (publicly owned) enterprise that sets tariffs according to marginal costs. This has been the tradition in many European countries in the aftermath of WW2. Due to lack of innovative pressure on and x-inefficiency in these companies, this solution is today viewed as inferior to the system of regulating independent (privately owned) firms. When the European gas market becomes liberalized, part of the process in many countries is to (partially) privatise the transport utilities. Privatised or not, in a liberalized market, the transport utilities should face an independent authority that overviews their operations not only in technical, but also in economic terms. Under regulation, a ''visible hand'' is introduced to correct the imperfect market's ''invisible hand''. By regulating the framework and conditions for how firms may operate, public authorities seek to achieve what is considered optimal for the society. The incentives and disincentives given for pricing and production should create mechanisms leading to an efficient allocation of resources and ''acceptable'' distribution of income. As part of intervening into firms' behavior, regulation may be introduced to direct the firm to behave in certain ways. The framework and regulatory mechanisms for the market must then be constructed in a way that companies voluntarily produce an amount at a price that gives maximal profits and simultaneously satisfies social goals. The regulations should lead to consistency between the company's desire to maximize profits and the society's desire for maximizing welfare, as in a perfectly competitive market. This is the core of regulatory economics

  4. Scheduling sampling to maximize information about time dependence in experiments with limited resources

    DEFF Research Database (Denmark)

    Græsbøll, Kaare; Christiansen, Lasse Engbo

    2013-01-01

    Looking for periodicity in sampled data requires that periods (lags) of different length are represented in the sampling plan. We here present a method to assist in planning of temporal studies with sparse resources, which optimizes the number of observed time lags for a fixed amount of samples w...

  5. Does mental exertion alter maximal muscle activation?

    Directory of Open Access Journals (Sweden)

    Vianney eRozand

    2014-09-01

    Full Text Available Mental exertion is known to impair endurance performance, but its effects on neuromuscular function remain unclear. The purpose of this study was to test the hypothesis that mental exertion reduces torque and muscle activation during intermittent maximal voluntary contractions of the knee extensors. Ten subjects performed in a randomized order three separate mental exertion conditions lasting 27 minutes each: i high mental exertion (incongruent Stroop task, ii moderate mental exertion (congruent Stroop task, iii low mental exertion (watching a movie. In each condition, mental exertion was combined with ten intermittent maximal voluntary contractions of the knee extensor muscles (one maximal voluntary contraction every 3 minutes. Neuromuscular function was assessed using electrical nerve stimulation. Maximal voluntary torque, maximal muscle activation and other neuromuscular parameters were similar across mental exertion conditions and did not change over time. These findings suggest that mental exertion does not affect neuromuscular function during intermittent maximal voluntary contractions of the knee extensors.

  6. AUC-Maximizing Ensembles through Metalearning.

    Science.gov (United States)

    LeDell, Erin; van der Laan, Mark J; Petersen, Maya

    2016-05-01

    Area Under the ROC Curve (AUC) is often used to measure the performance of an estimator in binary classification problems. An AUC-maximizing classifier can have significant advantages in cases where ranking correctness is valued or if the outcome is rare. In a Super Learner ensemble, maximization of the AUC can be achieved by the use of an AUC-maximining metalearning algorithm. We discuss an implementation of an AUC-maximization technique that is formulated as a nonlinear optimization problem. We also evaluate the effectiveness of a large number of different nonlinear optimization algorithms to maximize the cross-validated AUC of the ensemble fit. The results provide evidence that AUC-maximizing metalearners can, and often do, out-perform non-AUC-maximizing metalearning methods, with respect to ensemble AUC. The results also demonstrate that as the level of imbalance in the training data increases, the Super Learner ensemble outperforms the top base algorithm by a larger degree.

  7. Neural Feedback Scheduling of Real-Time Control Tasks

    OpenAIRE

    Xia, Feng; Tian, Yu-Chu; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    Many embedded real-time control systems suffer from resource constraints and dynamic workload variations. Although optimal feedback scheduling schemes are in principle capable of maximizing the overall control performance of multitasking control systems, most of them induce excessively large computational overheads associated with the mathematical optimization routines involved and hence are not directly applicable to practical systems. To optimize the overall control performance while minimi...

  8. On maximal massive 3D supergravity

    OpenAIRE

    Bergshoeff , Eric A; Hohm , Olaf; Rosseel , Jan; Townsend , Paul K

    2010-01-01

    ABSTRACT We construct, at the linearized level, the three-dimensional (3D) N = 4 supersymmetric " general massive supergravity " and the maximally supersymmetric N = 8 " new massive supergravity ". We also construct the maximally supersymmetric linearized N = 7 topologically massive supergravity, although we expect N = 6 to be maximal at the non-linear level. (Bergshoeff, Eric A) (Hohm, Olaf) (Rosseel, Jan) P.K.Townsend@da...

  9. Inclusive Fitness Maximization:An Axiomatic Approach

    OpenAIRE

    Okasha, Samir; Weymark, John; Bossert, Walter

    2014-01-01

    Kin selection theorists argue that evolution in social contexts will lead organisms to behave as if maximizing their inclusive, as opposed to personal, fitness. The inclusive fitness concept allows biologists to treat organisms as akin to rational agents seeking to maximize a utility function. Here we develop this idea and place it on a firm footing by employing a standard decision-theoretic methodology. We show how the principle of inclusive fitness maximization and a related principle of qu...

  10. Activity versus outcome maximization in time management.

    Science.gov (United States)

    Malkoc, Selin A; Tonietto, Gabriela N

    2018-04-30

    Feeling time-pressed has become ubiquitous. Time management strategies have emerged to help individuals fit in more of their desired and necessary activities. We provide a review of these strategies. In doing so, we distinguish between two, often competing, motives people have in managing their time: activity maximization and outcome maximization. The emerging literature points to an important dilemma: a given strategy that maximizes the number of activities might be detrimental to outcome maximization. We discuss such factors that might hinder performance in work tasks and enjoyment in leisure tasks. Finally, we provide theoretically grounded recommendations that can help balance these two important goals in time management. Published by Elsevier Ltd.

  11. On the maximal superalgebras of supersymmetric backgrounds

    International Nuclear Information System (INIS)

    Figueroa-O'Farrill, Jose; Hackett-Jones, Emily; Moutsopoulos, George; Simon, Joan

    2009-01-01

    In this paper we give a precise definition of the notion of a maximal superalgebra of certain types of supersymmetric supergravity backgrounds, including the Freund-Rubin backgrounds, and propose a geometric construction extending the well-known construction of its Killing superalgebra. We determine the structure of maximal Lie superalgebras and show that there is a finite number of isomorphism classes, all related via contractions from an orthosymplectic Lie superalgebra. We use the structure theory to show that maximally supersymmetric waves do not possess such a maximal superalgebra, but that the maximally supersymmetric Freund-Rubin backgrounds do. We perform the explicit geometric construction of the maximal superalgebra of AdS 4 X S 7 and find that it is isomorphic to osp(1|32). We propose an algebraic construction of the maximal superalgebra of any background asymptotic to AdS 4 X S 7 and we test this proposal by computing the maximal superalgebra of the M2-brane in its two maximally supersymmetric limits, finding agreement.

  12. Task-oriented maximally entangled states

    International Nuclear Information System (INIS)

    Agrawal, Pankaj; Pradhan, B

    2010-01-01

    We introduce the notion of a task-oriented maximally entangled state (TMES). This notion depends on the task for which a quantum state is used as the resource. TMESs are the states that can be used to carry out the task maximally. This concept may be more useful than that of a general maximally entangled state in the case of a multipartite system. We illustrate this idea by giving an operational definition of maximally entangled states on the basis of communication tasks of teleportation and superdense coding. We also give examples and a procedure to obtain such TMESs for n-qubit systems.

  13. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  14. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  15. Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off

    Directory of Open Access Journals (Sweden)

    Chun-Cheng Lin

    2014-01-01

    Full Text Available When it comes to nurse shift schedules, it is found that the nursing staff have diverse preferences about shift rotations and days-off. The previous studies only focused on the most preferred work shift and the number of satisfactory days-off of the schedule at the current schedule period but had few discussions on the previous schedule periods and other preference levels for shifts and days-off, which may affect fairness of shift schedules. As a result, this paper proposes a nurse scheduling model based upon integer programming that takes into account constraints of the schedule, different preference ranks towards each shift, and the historical data of previous schedule periods to maximize the satisfaction of all the nursing staff's preferences about the shift schedule. The main contribution of the proposed model is that we consider that the nursing staff’s satisfaction level is affected by multiple preference ranks and their priority ordering to be scheduled, so that the quality of the generated shift schedule is more reasonable. Numerical results show that the planned shifts and days-off are fair and successfully meet the preferences of all the nursing staff.

  16. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  17. Bilevel Fuzzy Chance Constrained Hospital Outpatient Appointment Scheduling Model

    Directory of Open Access Journals (Sweden)

    Xiaoyang Zhou

    2016-01-01

    Full Text Available Hospital outpatient departments operate by selling fixed period appointments for different treatments. The challenge being faced is to improve profit by determining the mix of full time and part time doctors and allocating appointments (which involves scheduling a combination of doctors, patients, and treatments to a time period in a department optimally. In this paper, a bilevel fuzzy chance constrained model is developed to solve the hospital outpatient appointment scheduling problem based on revenue management. In the model, the hospital, the leader in the hierarchy, decides the mix of the hired full time and part time doctors to maximize the total profit; each department, the follower in the hierarchy, makes the decision of the appointment scheduling to maximize its own profit while simultaneously minimizing surplus capacity. Doctor wage and demand are considered as fuzzy variables to better describe the real-life situation. Then we use chance operator to handle the model with fuzzy parameters and equivalently transform the appointment scheduling model into a crisp model. Moreover, interactive algorithm based on satisfaction is employed to convert the bilevel programming into a single level programming, in order to make it solvable. Finally, the numerical experiments were executed to demonstrate the efficiency and effectiveness of the proposed approaches.

  18. Generating unit maintenance scheduling under competitive market environments

    International Nuclear Information System (INIS)

    Jin Ho Kim; Jong Bae Park; Jong Keun Park; Yeung Han Chun

    2005-01-01

    A novel approach to a generating unit maintenance scheduling problem in competitive electricity markets is presented in this paper. The objective is to develop a game-theoretic framework for analyzing strategic behaviors of generating companies (Gencos) from the standpoint of the generating unit maintenance scheduling (GMS) game and for obtaining the equilibrium solution for the GMS game. The GMS problem is formulated as a dynamic non-cooperative game with complete information. The players correspond to profit maximizing individual Gencos, and the payoff of each player is defined as the profits from the energy market. The optimal schedule is defined by Nash equilibrium (equilibriums) of the game. Numerical results for two-Genco system are used to demonstrate that the proposed framework can be successfully applied to analyzing the strategic behaviors of each Genco and to obtaining the corresponding Nash equilibrium. The result indicates that generating unit maintenance schedule is one of the major strategic behaviors whereby Genco maximize their profits in a competitive market environment. (author)

  19. Two-step irradiance schedule versus single-dose tramadol sustained-release tablets for pain control during topical 5-aminolevulinic acid-photodynamic therapy of condyloma acuminatum in Chinese patients: a randomized comparative study.

    Science.gov (United States)

    Mchepange, Uwesu O; Huang, Chun-Yan; Sun, Yi; Tu, Ya-Ting; Tao, Juan

    2014-07-01

    Photodynamic therapy with 5-aminolevulinic acid (ALA-PDT) offers promising results for the treatment of condyloma acuminatum. However, patients have to dwell with pain to benefit from this otherwise effective and safe "off-label" treatment modality. Several techniques have been explored to control ALA-PDT-induced pain, but the desperate search for a universally accepted method is still ongoing. This study compares the two-step irradiance approach with single-dose administration of 100 mg tramadol sustained-release tablets for pain induced by ALA-PDT of condyloma acuminatum in Chinese patients. Adult Chinese patients with condyloma acuminatum were enrolled in a randomized comparative study. Pain levels were compared using the Numeric Rating Scale (NRS) at pre-defined assessment points during and after irradiation. The pain was dominated by characteristics such as burning and pricking and was almost always local and superficial. The median pain scores were lower in the two-step irradiance group at 1 minute (U = 621.5, P = 0.002) but higher at 20 minutes (U = 585.5, P = 0.002). The median pain scores between the two groups did not differ significantly at other assessment points. The pain was moderate in both groups and peaked earlier in the analgesics group (median: 5 minutes) but later in the two-step irradiance group (median: 15 minutes). The pain was generally mild. The median pain scores were equal at each assessment point, except at 3 hours where the median was lower in the analgesics group (1.0) as compared with the two-step irradiance group (2.0) (U = 725.0, P = 0.056). Pain in the two-step irradiance protocol is irradiance-dependent. The two-step irradiance approach produces significant benefits over analgesics during the initial stages of therapy but analgesics offer significant benefits thereafter. There are potential benefits of combining the two approaches in minimizing ALA-PDT-induced pain. © 2014 Wiley Periodicals

  20. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  1. Accelerated postirradiation recovery of hematopoietic marrow following priming with low doses of vincristine

    International Nuclear Information System (INIS)

    Johnke, R.M.; Abernathy, R.S.

    1990-01-01

    The present investigation is a continuation of efforts to characterize the radioprotective potential of priming with vincristine (VcR). In this study, the postirradiation recovery kinetics of the marrow's hematopoietic stem cell, progenitor cell, and stromal cell compartments were monitored following exposure to a range of sublethal radiation doses to determine (a) the optimal VcR/radiation intertreatment interval for achieving maximal hematopoietic protection, (b) whether this optimal interval is influenced by the dose of radiation administered, and (c) whether the radioprotection observed involves the hematopoietic stroma. The results demonstrate that the degree of radioprotection observed was significantly influenced by the scheduling of the VcR priming dose with respect to the radiation exposure. An intertreatment interval of 24 h provided maximal radioprotective benefit irrespective of the radiation dose administered. Additionally, the radioprotection following VcR priming appeared to be more the result of an accelerated recovery in the hematopoietic stem cell and progenitor cell compartments than a change in their intrinsic radiosensitivity. The data also suggest that this accelerated recovery was not a consequence of greater radioprotection of marrow stroma. Finally, the radioprotection observed following VcR priming did not appear to involve a selective lineage response by either the erythroid or the granulomonocytic progenitor compartments

  2. Maximally Entangled Multipartite States: A Brief Survey

    International Nuclear Information System (INIS)

    Enríquez, M; Wintrowicz, I; Życzkowski, K

    2016-01-01

    The problem of identifying maximally entangled quantum states of a composite quantum systems is analyzed. We review some states of multipartite systems distinguished with respect to certain measures of quantum entanglement. Numerical results obtained for 4-qubit pure states illustrate the fact that the notion of maximally entangled state depends on the measure used. (paper)

  3. Utility maximization and mode of payment

    NARCIS (Netherlands)

    Koning, R.H.; Ridder, G.; Heijmans, R.D.H.; Pollock, D.S.G.; Satorra, A.

    2000-01-01

    The implications of stochastic utility maximization in a model of choice of payment are examined. Three types of compatibility with utility maximization are distinguished: global compatibility, local compatibility on an interval, and local compatibility on a finite set of points. Keywords:

  4. Corporate Social Responsibility and Profit Maximizing Behaviour

    OpenAIRE

    Becchetti, Leonardo; Giallonardo, Luisa; Tessitore, Maria Elisabetta

    2005-01-01

    We examine the behavior of a profit maximizing monopolist in a horizontal differentiation model in which consumers differ in their degree of social responsibility (SR) and consumers SR is dynamically influenced by habit persistence. The model outlines parametric conditions under which (consumer driven) corporate social responsibility is an optimal choice compatible with profit maximizing behavior.

  5. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  6. Inclusive fitness maximization: An axiomatic approach.

    Science.gov (United States)

    Okasha, Samir; Weymark, John A; Bossert, Walter

    2014-06-07

    Kin selection theorists argue that evolution in social contexts will lead organisms to behave as if maximizing their inclusive, as opposed to personal, fitness. The inclusive fitness concept allows biologists to treat organisms as akin to rational agents seeking to maximize a utility function. Here we develop this idea and place it on a firm footing by employing a standard decision-theoretic methodology. We show how the principle of inclusive fitness maximization and a related principle of quasi-inclusive fitness maximization can be derived from axioms on an individual׳s 'as if preferences' (binary choices) for the case in which phenotypic effects are additive. Our results help integrate evolutionary theory and rational choice theory, help draw out the behavioural implications of inclusive fitness maximization, and point to a possible way in which evolution could lead organisms to implement it. Copyright © 2014 Elsevier Ltd. All rights reserved.

  7. Maximal Entanglement in High Energy Physics

    Directory of Open Access Journals (Sweden)

    Alba Cervera-Lierta, José I. Latorre, Juan Rojo, Luca Rottoli

    2017-11-01

    Full Text Available We analyze how maximal entanglement is generated at the fundamental level in QED by studying correlations between helicity states in tree-level scattering processes at high energy. We demonstrate that two mechanisms for the generation of maximal entanglement are at work: i $s$-channel processes where the virtual photon carries equal overlaps of the helicities of the final state particles, and ii the indistinguishable superposition between $t$- and $u$-channels. We then study whether requiring maximal entanglement constrains the coupling structure of QED and the weak interactions. In the case of photon-electron interactions unconstrained by gauge symmetry, we show how this requirement allows reproducing QED. For $Z$-mediated weak scattering, the maximal entanglement principle leads to non-trivial predictions for the value of the weak mixing angle $\\theta_W$. Our results are a first step towards understanding the connections between maximal entanglement and the fundamental symmetries of high-energy physics.

  8. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  9. Optimized Treatment Schedules for Chronic Myeloid Leukemia.

    Directory of Open Access Journals (Sweden)

    Qie He

    2016-10-01

    Full Text Available Over the past decade, several targeted therapies (e.g. imatinib, dasatinib, nilotinib have been developed to treat Chronic Myeloid Leukemia (CML. Despite an initial response to therapy, drug resistance remains a problem for some CML patients. Recent studies have shown that resistance mutations that preexist treatment can be detected in a substantial number of patients, and that this may be associated with eventual treatment failure. One proposed method to extend treatment efficacy is to use a combination of multiple targeted therapies. However, the design of such combination therapies (timing, sequence, etc. remains an open challenge. In this work we mathematically model the dynamics of CML response to combination therapy and analyze the impact of combination treatment schedules on treatment efficacy in patients with preexisting resistance. We then propose an optimization problem to find the best schedule of multiple therapies based on the evolution of CML according to our ordinary differential equation model. This resulting optimization problem is nontrivial due to the presence of ordinary different equation constraints and integer variables. Our model also incorporates drug toxicity constraints by tracking the dynamics of patient neutrophil counts in response to therapy. We determine optimal combination strategies that maximize time until treatment failure on hypothetical patients, using parameters estimated from clinical data in the literature.

  10. Time-dose modifications

    International Nuclear Information System (INIS)

    Kian Ang, K.

    1987-01-01

    Changes in fractionation schedule can be made by various approaches. However, from the first principle, it is anticipated that strategies of hyperfractionation and/or accelerated fractionation offer the most promised in improving the therapeutic ratio. Hyperfractionation is defined as a treatment schedule in which a large number of significantly reduced dose fractions (--1.2 Gy/fraction) is used to give a greater total dose in a conventional overall time period. The results of the pilot studies testing the efficacy of hyperfractionation have been encouraging. The most valid clinical trial of pure hyperfractionation, however, is that conducted by the EORTC. This study compared 70 Gy in 35 fractions or 80.5 Gy in 70 fractions over 7 weeks in the treatment of patients with oropharyngeal carcinomas. The local tumor control was significantly improved in the hyperfractionated arm without increasing the morbidity. Accelerated fractionation is defined as a schedule in which the overall time of treatment is reduced without significant changes in the total dose and fraction size. The strategy has been used to treat patients with malignant gliomas, melanomas and Head and Neck cancers. The data in Head and Neck Cancers seem to be promising

  11. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  12. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  13. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  14. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  15. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  16. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  17. Efficient Work Team Scheduling: Using Psychological Models of Knowledge Retention to Improve Code Writing Efficiency

    Directory of Open Access Journals (Sweden)

    Michael J. Pelosi

    2014-12-01

    Full Text Available Development teams and programmers must retain critical information about their work during work intervals and gaps in order to improve future performance when work resumes. Despite time lapses, project managers want to maximize coding efficiency and effectiveness. By developing a mathematically justified, practically useful, and computationally tractable quantitative and cognitive model of learning and memory retention, this study establishes calculations designed to maximize scheduling payoff and optimize developer efficiency and effectiveness.

  18. Multiple dose study of the combined radiosensitizers Ro 03-8799 (pimonidazole) and SR 2508 (etanidazole)

    International Nuclear Information System (INIS)

    Bleehen, N.M.; Newman, H.F.; Maughan, T.S.; Workman, P.

    1989-01-01

    The hypoxic cell radiosensitizers Ro 03-8799 and SR 2508 have different clinical toxicities. The former produces an acute but transient central nervous system syndrome, whereas the latter produces cumulative peripheral neuropathy. Following single dose studies, an escalating multiple dose schedule using both drugs in combination showed no unexpected adverse reactions at lower doses. This study identifies the clinical tolerance and pharmacokinetics when doses in the region of the maximal tolerated dose are given to 26 patients receiving infusions of 0.75 g/m2 Ro 03-8799 and 2 g/m2 SR 2508 three times per week. At 15 doses, 3/4 patients experienced WHO grade 2 peripheral neuropathy, whereas at 12 doses 1/9 developed grade 2 and 6/9 developed grade 1 neuropathies. This represents a lower dose of SR 2508 than can be given alone suggesting that some interaction between the two drugs does exist in terms of chronic peripheral neurotoxicity. Pharmacokinetic studies show no adverse interactions between the two drugs and minimal inter-patient variation. From bivariate analysis, cumulative AUC for Ro 03-8799 has the most significant correlation with the development of peripheral neuropathy. Tumor drug concentrations normalized to the administered dose show mean values of 34 micrograms/g Ro 03-8799 and 76 micrograms/g SR 2508 30 minutes after infusion. These could be expected to produce a single dose sensitizer enhancement ratio of 1.5. The combination of the two sensitizers at the maximum tolerable dose may be expected to give an increased therapeutic efficacy over either drug alone

  19. Bipartite Bell Inequality and Maximal Violation

    International Nuclear Information System (INIS)

    Li Ming; Fei Shaoming; Li-Jost Xian-Qing

    2011-01-01

    We present new bell inequalities for arbitrary dimensional bipartite quantum systems. The maximal violation of the inequalities is computed. The Bell inequality is capable of detecting quantum entanglement of both pure and mixed quantum states more effectively. (general)

  20. HEALTH INSURANCE: CONTRIBUTIONS AND REIMBURSEMENT MAXIMAL

    CERN Document Server

    HR Division

    2000-01-01

    Affected by both the salary adjustment index on 1.1.2000 and the evolution of the staff members and fellows population, the average reference salary, which is used as an index for fixed contributions and reimbursement maximal, has changed significantly. An adjustment of the amounts of the reimbursement maximal and the fixed contributions is therefore necessary, as from 1 January 2000.Reimbursement maximalThe revised reimbursement maximal will appear on the leaflet summarising the benefits for the year 2000, which will soon be available from the divisional secretariats and from the AUSTRIA office at CERN.Fixed contributionsThe fixed contributions, applicable to some categories of voluntarily insured persons, are set as follows (amounts in CHF for monthly contributions):voluntarily insured member of the personnel, with complete coverage:815,- (was 803,- in 1999)voluntarily insured member of the personnel, with reduced coverage:407,- (was 402,- in 1999)voluntarily insured no longer dependent child:326,- (was 321...

  1. Maximal Inequalities for Dependent Random Variables

    DEFF Research Database (Denmark)

    Hoffmann-Jorgensen, Jorgen

    2016-01-01

    Maximal inequalities play a crucial role in many probabilistic limit theorem; for instance, the law of large numbers, the law of the iterated logarithm, the martingale limit theorem and the central limit theorem. Let X-1, X-2,... be random variables with partial sums S-k = X-1 + ... + X-k. Then a......Maximal inequalities play a crucial role in many probabilistic limit theorem; for instance, the law of large numbers, the law of the iterated logarithm, the martingale limit theorem and the central limit theorem. Let X-1, X-2,... be random variables with partial sums S-k = X-1 + ... + X......-k. Then a maximal inequality gives conditions ensuring that the maximal partial sum M-n = max(1) (...

  2. Maximizing Function through Intelligent Robot Actuator Control

    Data.gov (United States)

    National Aeronautics and Space Administration — Maximizing Function through Intelligent Robot Actuator Control Successful missions to Mars and beyond will only be possible with the support of high-performance...

  3. An ethical justification of profit maximization

    DEFF Research Database (Denmark)

    Koch, Carsten Allan

    2010-01-01

    In much of the literature on business ethics and corporate social responsibility, it is more or less taken for granted that attempts to maximize profits are inherently unethical. The purpose of this paper is to investigate whether an ethical argument can be given in support of profit maximizing...... behaviour. It is argued that some form of consequential ethics must be applied, and that both profit seeking and profit maximization can be defended from a rule-consequential point of view. It is noted, however, that the result does not apply unconditionally, but requires that certain form of profit (and...... utility) maximizing actions are ruled out, e.g., by behavioural norms or formal institutions....

  4. A definition of maximal CP-violation

    International Nuclear Information System (INIS)

    Roos, M.

    1985-01-01

    The unitary matrix of quark flavour mixing is parametrized in a general way, permitting a mathematically natural definition of maximal CP violation. Present data turn out to violate this definition by 2-3 standard deviations. (orig.)

  5. A cosmological problem for maximally symmetric supergravity

    International Nuclear Information System (INIS)

    German, G.; Ross, G.G.

    1986-01-01

    Under very general considerations it is shown that inflationary models of the universe based on maximally symmetric supergravity with flat potentials are unable to resolve the cosmological energy density (Polonyi) problem. (orig.)

  6. Insulin resistance and maximal oxygen uptake

    DEFF Research Database (Denmark)

    Seibaek, Marie; Vestergaard, Henrik; Burchardt, Hans

    2003-01-01

    BACKGROUND: Type 2 diabetes, coronary atherosclerosis, and physical fitness all correlate with insulin resistance, but the relative importance of each component is unknown. HYPOTHESIS: This study was undertaken to determine the relationship between insulin resistance, maximal oxygen uptake......, and the presence of either diabetes or ischemic heart disease. METHODS: The study population comprised 33 patients with and without diabetes and ischemic heart disease. Insulin resistance was measured by a hyperinsulinemic euglycemic clamp; maximal oxygen uptake was measured during a bicycle exercise test. RESULTS......: There was a strong correlation between maximal oxygen uptake and insulin-stimulated glucose uptake (r = 0.7, p = 0.001), and maximal oxygen uptake was the only factor of importance for determining insulin sensitivity in a model, which also included the presence of diabetes and ischemic heart disease. CONCLUSION...

  7. Maximal supergravities and the E10 model

    International Nuclear Information System (INIS)

    Kleinschmidt, Axel; Nicolai, Hermann

    2006-01-01

    The maximal rank hyperbolic Kac-Moody algebra e 10 has been conjectured to play a prominent role in the unification of duality symmetries in string and M theory. We review some recent developments supporting this conjecture

  8. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    visibility, sky background, required time sampling coverage) and the dynamic change of the system conditions (i.e., weather, system conditions). Off-line and on-line strategies are integrated into a single tool for a suitable transfer of the target prioritization made by the science team to the real-time schedule that will be used by the instrument operators. A suitable solution will be expected to increase the efficiency of telescope operations, which will represent an important benefit in terms of scientific return and operational costs. We present the operational scheduling tool designed for CARMENES, which is based on two algorithms combining a global and a local search: Genetic Algorithms and Hill Climbing astronomy-based heuristics, respectively. The algorithm explores a large amount of potential solutions from the vast search space and is able to identify the most efficient ones. A planning solution is considered efficient when it optimizes the objectives defined, which, in our case, are related to the reduction of the time that the telescope is not in use and the maximization of the scientific return, measured in terms of the time coverage of each target in the survey. We present the results obtained using different test cases.

  9. Gaussian maximally multipartite-entangled states

    Science.gov (United States)

    Facchi, Paolo; Florio, Giuseppe; Lupo, Cosmo; Mancini, Stefano; Pascazio, Saverio

    2009-12-01

    We study maximally multipartite-entangled states in the context of Gaussian continuous variable quantum systems. By considering multimode Gaussian states with constrained energy, we show that perfect maximally multipartite-entangled states, which exhibit the maximum amount of bipartite entanglement for all bipartitions, only exist for systems containing n=2 or 3 modes. We further numerically investigate the structure of these states and their frustration for n≤7 .

  10. Gaussian maximally multipartite-entangled states

    International Nuclear Information System (INIS)

    Facchi, Paolo; Florio, Giuseppe; Pascazio, Saverio; Lupo, Cosmo; Mancini, Stefano

    2009-01-01

    We study maximally multipartite-entangled states in the context of Gaussian continuous variable quantum systems. By considering multimode Gaussian states with constrained energy, we show that perfect maximally multipartite-entangled states, which exhibit the maximum amount of bipartite entanglement for all bipartitions, only exist for systems containing n=2 or 3 modes. We further numerically investigate the structure of these states and their frustration for n≤7.

  11. Neutrino mass textures with maximal CP violation

    International Nuclear Information System (INIS)

    Aizawa, Ichiro; Kitabayashi, Teruyuki; Yasue, Masaki

    2005-01-01

    We show three types of neutrino mass textures, which give maximal CP violation as well as maximal atmospheric neutrino mixing. These textures are described by six real mass parameters: one specified by two complex flavor neutrino masses and two constrained ones and the others specified by three complex flavor neutrino masses. In each texture, we calculate mixing angles and masses, which are consistent with observed data, as well as Majorana CP phases

  12. Why firms should not always maximize profits

    OpenAIRE

    Kolstad, Ivar

    2006-01-01

    Though corporate social responsibility (CSR) is on the agenda of most major corporations, corporate executives still largely support the view that corporations should maximize the returns to their owners. There are two lines of defence for this position. One is the Friedmanian view that maximizing owner returns is the corporate social responsibility of corporations. The other is a position voiced by many executives, that CSR and profits go together. This paper argues that the first position i...

  13. Maximally Informative Observables and Categorical Perception

    OpenAIRE

    Tsiang, Elaine

    2012-01-01

    We formulate the problem of perception in the framework of information theory, and prove that categorical perception is equivalent to the existence of an observable that has the maximum possible information on the target of perception. We call such an observable maximally informative. Regardless whether categorical perception is real, maximally informative observables can form the basis of a theory of perception. We conclude with the implications of such a theory for the problem of speech per...

  14. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  15. Effect of 3D radiotherapy planning compared to 2D planning within a conventional treatment schedule of advanced lung cancer

    International Nuclear Information System (INIS)

    Schraube, P.; Spahn, U.; Oetzel, D.; Wannenmacher, M.

    2000-01-01

    Background: The effect of 3D radiotherapy planning (3D RTP) in comparison to 2D radiotherapy planning (2D RTP) was evaluated in a usually practiced treatment schedule (starting by v./d. opposing portals, continued with computer-planned portals) for non-small-cell lung cancer. Patients and Methods: In 20 patients with locally advanced non-small-cell lung cancer the computer-planned part of the treatment schedule was calculated 2- and 3-dimensionally. Target volume were the primary tumor, the involved and the electively irradiated mediastinal lymph nodes. The results of the 2D RTP were recalculated 3-dimensionally and the mean doses to target volume and organs at risk were defined. Further, the normal tissue complications were calculated. Results: Under the prerequisite of 44 Gy maximally allowed to the spinal cord and a dose to the reference point of 50 Gy a small, but significant advantage with 2.1 Gy to the target (p=0.004) and a reduction of 3.6 Gy to the heart (p=0.05) was achievable for 3D RTP. The dose to the lungs did not differ significantly (19.7 Gy for 2D RTP, 20.3 Gy for 3D RTP). The dose to the heart was not estimated critical by NTCP (normal tissue complication probability). The NTCP for the ipsilateral lung was 16.1 and 18.7% for 2D RTP and 3D RTP, respectively. Regarding the simulator-planned ap/pa fields at the start of the radiotherapy the advantage of 3D RTP was further reduced but remained significant. Favorable with respect to the mean lung dose and the NTCP (18.7% NTCP ipsilateral lung for early onset of 3D planned radiotherapy vs 31.7% for late onset of 3D planned radiotherapy) but not significantly measurable is the early start of the treatment by computerized RTP. Conclusion: The main advantage of 3D RTP in treatment of advanced lung cancer is the better coverage of the target volume. A reduction of the mean lung dose cannot be expected. A dose escalation by 3D RTP to target volumes as described here seems not to be possible because of

  16. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  17. Scheduling of Fault-Tolerant Embedded Systems with Soft and Hard Timing Constraints

    DEFF Research Database (Denmark)

    Izosimov, Viacheslav; Pop, Paul; Eles, Petru

    2008-01-01

    In this paper we present an approach to the synthesis of fault-tolerant schedules for embedded applications with soft and hard real-time constraints. We are interested to guarantee the deadlines for the hard processes even in the case of faults, while maximizing the overall utility. We use time....../utility functions to capture the utility of soft processes. Process re-execution is employed to recover from multiple faults. A single static schedule computed off-line is not fault tolerant and is pessimistic in terms of utility, while a purely online approach, which computes a new schedule every time a process...

  18. Producing Satisfactory Solutions to Scheduling Problems: An Iterative Constraint Relaxation Approach

    Science.gov (United States)

    Chien, S.; Gratch, J.

    1994-01-01

    One drawback to using constraint-propagation in planning and scheduling systems is that when a problem has an unsatisfiable set of constraints such algorithms typically only show that no solution exists. While, technically correct, in practical situations, it is desirable in these cases to produce a satisficing solution that satisfies the most important constraints (typically defined in terms of maximizing a utility function). This paper describes an iterative constraint relaxation approach in which the scheduler uses heuristics to progressively relax problem constraints until the problem becomes satisfiable. We present empirical results of applying these techniques to the problem of scheduling spacecraft communications for JPL/NASA antenna resources.

  19. Constraint optimization model of a scheduling problem for a robotic arm in automatic systems

    DEFF Research Database (Denmark)

    Kristiansen, Ewa; Smith, Stephen F.; Kristiansen, Morten

    2014-01-01

    are characteristics of the painting process application itself. Unlike spot-welding, painting tasks require movement of the entire robot arm. In addition to minimizing intertask duration, the scheduler must strive to maximize painting quality and the problem is formulated as a multi-objective optimization problem....... The scheduling model is implemented as a stand-alone module using constraint programming, and integrated with a larger automatic system. The results of a number of simulation experiments with simple parts are reported, both to characterize the functionality of the scheduler and to illustrate the operation...... of the entire software system for automatic generation of robot programs for painting....

  20. Shareholder, stakeholder-owner or broad stakeholder maximization

    OpenAIRE

    Mygind, Niels

    2004-01-01

    With reference to the discussion about shareholder versus stakeholder maximization it is argued that the normal type of maximization is in fact stakeholder-owner maxi-mization. This means maximization of the sum of the value of the shares and stake-holder benefits belonging to the dominating stakeholder-owner. Maximization of shareholder value is a special case of owner-maximization, and only under quite re-strictive assumptions shareholder maximization is larger or equal to stakeholder-owner...

  1. Joint Network Coding and Opportunistic Scheduling for the Bidirectional Relay Channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-05-27

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users’ transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited.

  2. Joint Network Coding and Opportunistic Scheduling for the Bidirectional Relay Channel

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein; Alouini, Mohamed-Slim; Zafar, Ammar

    2013-01-01

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users’ transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited.

  3. HOLD MODE BASED DYNAMIC PRIORITY LOAD ADAPTIVE INTERPICONET SCHEDULING FOR BLUETOOTH SCATTERNETS

    Directory of Open Access Journals (Sweden)

    G.S. Mahalakshmi

    2011-09-01

    Full Text Available Scheduling in piconets has emerged as a challenging research area. Interpiconet scheduling focuses on when a bridge is switched among various piconets and how a bridge node communicates with the masters in different piconets. This paper proposes an interpiconet scheduling algorithm named, hold mode based dynamic traffic priority load adaptive scheduling. The bridges are adaptively switched between the piconets according to various traffic loads. The main goal is to maximize the utilization of the bridge by reducing the bridge switch wastes, utilize intelligent decision making algorithm, resolve conflict between the masters, and allow negotiation for bridge utilization in HDPLIS using bridge failure-bridge repair procedure . The Hold mode - dynamic traffic - priority based - load adaptive scheduling reduces the number of bridge switch wastes and hence increases the efficiency of the bridge which results in increased performance of the system.

  4. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  5. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  6. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  7. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  8. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  9. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  10. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  11. Vacua of maximal gauged D=3 supergravities

    International Nuclear Information System (INIS)

    Fischbacher, T; Nicolai, H; Samtleben, H

    2002-01-01

    We analyse the scalar potentials of maximal gauged three-dimensional supergravities which reveal a surprisingly rich structure. In contrast to maximal supergravities in dimensions D≥4, all these theories possess a maximally supersymmetric (N=16) ground state with negative cosmological constant Λ 2 gauged theory, whose maximally supersymmetric groundstate has Λ = 0. We compute the mass spectra of bosonic and fermionic fluctuations around these vacua and identify the unitary irreducible representations of the relevant background (super)isometry groups to which they belong. In addition, we find several stationary points which are not maximally supersymmetric, and determine their complete mass spectra as well. In particular, we show that there are analogues of all stationary points found in higher dimensions, among them are de Sitter (dS) vacua in the theories with noncompact gauge groups SO(5, 3) 2 and SO(4, 4) 2 , as well as anti-de Sitter (AdS) vacua in the compact gauged theory preserving 1/4 and 1/8 of the supersymmetries. All the dS vacua have tachyonic instabilities, whereas there do exist nonsupersymmetric AdS vacua which are stable, again in contrast to the D≥4 theories

  12. An information maximization model of eye movements

    Science.gov (United States)

    Renninger, Laura Walker; Coughlan, James; Verghese, Preeti; Malik, Jitendra

    2005-01-01

    We propose a sequential information maximization model as a general strategy for programming eye movements. The model reconstructs high-resolution visual information from a sequence of fixations, taking into account the fall-off in resolution from the fovea to the periphery. From this framework we get a simple rule for predicting fixation sequences: after each fixation, fixate next at the location that minimizes uncertainty (maximizes information) about the stimulus. By comparing our model performance to human eye movement data and to predictions from a saliency and random model, we demonstrate that our model is best at predicting fixation locations. Modeling additional biological constraints will improve the prediction of fixation sequences. Our results suggest that information maximization is a useful principle for programming eye movements.

  13. Utility Maximization in Nonconvex Wireless Systems

    CERN Document Server

    Brehmer, Johannes

    2012-01-01

    This monograph formulates a framework for modeling and solving utility maximization problems in nonconvex wireless systems. First, a model for utility optimization in wireless systems is defined. The model is general enough to encompass a wide array of system configurations and performance objectives. Based on the general model, a set of methods for solving utility maximization problems is developed. The development is based on a careful examination of the properties that are required for the application of each method. The focus is on problems whose initial formulation does not allow for a solution by standard convex methods. Solution approaches that take into account the nonconvexities inherent to wireless systems are discussed in detail. The monograph concludes with two case studies that demonstrate the application of the proposed framework to utility maximization in multi-antenna broadcast channels.

  14. Resource-Constrained Optimal Scheduling of Synchronous Dataflow Graphs via Timed Automata

    NARCIS (Netherlands)

    Ahmad, W.; de Groote, Robert; Holzenspies, P.K.F.; Stoelinga, Mariëlle Ida Antoinette; van de Pol, Jan Cornelis

    Synchronous dataflow (SDF) graphs are a widely used formalism for modelling, analysing and realising streaming applications, both on a single processor and in a multiprocessing context. Efficient schedules are essential to obtain maximal throughput under the constraint of available resources. This

  15. Maximizing band gaps in plate structures

    DEFF Research Database (Denmark)

    Halkjær, Søren; Sigmund, Ole; Jensen, Jakob Søndergaard

    2006-01-01

    periodic plate using Bloch theory, which conveniently reduces the maximization problem to that of a single base cell. Secondly, we construct a finite periodic plate using a number of the optimized base cells in a postprocessed version. The dynamic properties of the finite plate are investigated......Band gaps, i.e., frequency ranges in which waves cannot propagate, can be found in elastic structures for which there is a certain periodic modulation of the material properties or structure. In this paper, we maximize the band gap size for bending waves in a Mindlin plate. We analyze an infinite...... theoretically and experimentally and the issue of finite size effects is addressed....

  16. Singularity Structure of Maximally Supersymmetric Scattering Amplitudes

    DEFF Research Database (Denmark)

    Arkani-Hamed, Nima; Bourjaily, Jacob L.; Cachazo, Freddy

    2014-01-01

    We present evidence that loop amplitudes in maximally supersymmetric (N=4) Yang-Mills theory (SYM) beyond the planar limit share some of the remarkable structures of the planar theory. In particular, we show that through two loops, the four-particle amplitude in full N=4 SYM has only logarithmic ...... singularities and is free of any poles at infinity—properties closely related to uniform transcendentality and the UV finiteness of the theory. We also briefly comment on implications for maximal (N=8) supergravity theory (SUGRA)....

  17. Learning curves for mutual information maximization

    International Nuclear Information System (INIS)

    Urbanczik, R.

    2003-01-01

    An unsupervised learning procedure based on maximizing the mutual information between the outputs of two networks receiving different but statistically dependent inputs is analyzed [S. Becker and G. Hinton, Nature (London) 355, 161 (1992)]. For a generic data model, I show that in the large sample limit the structure in the data is recognized by mutual information maximization. For a more restricted model, where the networks are similar to perceptrons, I calculate the learning curves for zero-temperature Gibbs learning. These show that convergence can be rather slow, and a way of regularizing the procedure is considered

  18. Finding Maximal Pairs with Bounded Gap

    DEFF Research Database (Denmark)

    Brodal, Gerth Stølting; Lyngsø, Rune B.; Pedersen, Christian N. S.

    1999-01-01

    . In this paper we present methods for finding all maximal pairs under various constraints on the gap. In a string of length n we can find all maximal pairs with gap in an upper and lower bounded interval in time O(n log n+z) where z is the number of reported pairs. If the upper bound is removed the time reduces...... to O(n+z). Since a tandem repeat is a pair where the gap is zero, our methods can be seen as a generalization of finding tandem repeats. The running time of our methods equals the running time of well known methods for finding tandem repeats....

  19. Price schedules coordination for electricity pool markets

    Science.gov (United States)

    Legbedji, Alexis Motto

    2002-04-01

    We consider the optimal coordination of a class of mathematical programs with equilibrium constraints, which is formally interpreted as a resource-allocation problem. Many decomposition techniques were proposed to circumvent the difficulty of solving large systems with limited computer resources. The considerable improvement in computer architecture has allowed the solution of large-scale problems with increasing speed. Consequently, interest in decomposition techniques has waned. Nonetheless, there is an important class of applications for which decomposition techniques will still be relevant, among others, distributed systems---the Internet, perhaps, being the most conspicuous example---and competitive economic systems. Conceptually, a competitive economic system is a collection of agents that have similar or different objectives while sharing the same system resources. In theory, constructing a large-scale mathematical program and solving it centrally, using currently available computing power can optimize such systems of agents. In practice, however, because agents are self-interested and not willing to reveal some sensitive corporate data, one cannot solve these kinds of coordination problems by simply maximizing the sum of agent's objective functions with respect to their constraints. An iterative price decomposition or Lagrangian dual method is considered best suited because it can operate with limited information. A price-directed strategy, however, can only work successfully when coordinating or equilibrium prices exist, which is not generally the case when a weak duality is unavoidable. Showing when such prices exist and how to compute them is the main subject of this thesis. Among our results, we show that, if the Lagrangian function of a primal program is additively separable, price schedules coordination may be attained. The prices are Lagrange multipliers, and are also the decision variables of a dual program. In addition, we propose a new form of

  20. Heuristic Scheduling in Grid Environments: Reducing the Operational Energy Demand

    Science.gov (United States)

    Bodenstein, Christian

    In a world where more and more businesses seem to trade in an online market, the supply of online services to the ever-growing demand could quickly reach its capacity limits. Online service providers may find themselves maxed out at peak operation levels during high-traffic timeslots but too little demand during low-traffic timeslots, although the latter is becoming less frequent. At this point deciding which user is allocated what level of service becomes essential. The concept of Grid computing could offer a meaningful alternative to conventional super-computing centres. Not only can Grids reach the same computing speeds as some of the fastest supercomputers, but distributed computing harbors a great energy-saving potential. When scheduling projects in such a Grid environment however, simply assigning one process to a system becomes so complex in calculation that schedules are often too late to execute, rendering their optimizations useless. Current schedulers attempt to maximize the utility, given some sort of constraint, often reverting to heuristics. This optimization often comes at the cost of environmental impact, in this case CO 2 emissions. This work proposes an alternate model of energy efficient scheduling while keeping a respectable amount of economic incentives untouched. Using this model, it is possible to reduce the total energy consumed by a Grid environment using 'just-in-time' flowtime management, paired with ranking nodes by efficiency.

  1. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Science.gov (United States)

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  2. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Directory of Open Access Journals (Sweden)

    Jinxiang Dong

    2008-07-01

    Full Text Available There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting crosslayer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An eventdriven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN.

  3. Nickel-sulphate-induced contact dermatitis in the guinea pig maximization test

    DEFF Research Database (Denmark)

    Rohold, A E; Nielsen, G D; Andersen, Klaus Ejner

    1991-01-01

    Nickel sulphate is a sensitizer in guinea pigs, but the frequency of sensitization varies from study to study. The dose-response relationship for NiSO4.6H2O was evaluated in the guinea pig maximization test in this study. 6 intradermal (0.01%-3.0% aq.) and 6 topical (0.25%-10.0% pet.) concentrati...

  4. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  5. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  6. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  7. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  8. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  9. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  10. Maximizing the Range of a Projectile.

    Science.gov (United States)

    Brown, Ronald A.

    1992-01-01

    Discusses solutions to the problem of maximizing the range of a projectile. Presents three references that solve the problem with and without the use of calculus. Offers a fourth solution suitable for introductory physics courses that relies more on trigonometry and the geometry of the problem. (MDH)

  11. Robust Utility Maximization Under Convex Portfolio Constraints

    International Nuclear Information System (INIS)

    Matoussi, Anis; Mezghani, Hanen; Mnif, Mohamed

    2015-01-01

    We study a robust maximization problem from terminal wealth and consumption under a convex constraints on the portfolio. We state the existence and the uniqueness of the consumption–investment strategy by studying the associated quadratic backward stochastic differential equation. We characterize the optimal control by using the duality method and deriving a dynamic maximum principle

  12. Ehrenfest's Lottery--Time and Entropy Maximization

    Science.gov (United States)

    Ashbaugh, Henry S.

    2010-01-01

    Successful teaching of the Second Law of Thermodynamics suffers from limited simple examples linking equilibrium to entropy maximization. I describe a thought experiment connecting entropy to a lottery that mixes marbles amongst a collection of urns. This mixing obeys diffusion-like dynamics. Equilibrium is achieved when the marble distribution is…

  13. Reserve design to maximize species persistence

    Science.gov (United States)

    Robert G. Haight; Laurel E. Travis

    2008-01-01

    We develop a reserve design strategy to maximize the probability of species persistence predicted by a stochastic, individual-based, metapopulation model. Because the population model does not fit exact optimization procedures, our strategy involves deriving promising solutions from theory, obtaining promising solutions from a simulation optimization heuristic, and...

  14. Maximal indecomposable past sets and event horizons

    International Nuclear Information System (INIS)

    Krolak, A.

    1984-01-01

    The existence of maximal indecomposable past sets MIPs is demonstrated using the Kuratowski-Zorn lemma. A criterion for the existence of an absolute event horizon in space-time is given in terms of MIPs and a relation to black hole event horizon is shown. (author)

  15. Maximization of eigenvalues using topology optimization

    DEFF Research Database (Denmark)

    Pedersen, Niels Leergaard

    2000-01-01

    to localized modes in low density areas. The topology optimization problem is formulated using the SIMP method. Special attention is paid to a numerical method for removing localized eigenmodes in low density areas. The method is applied to numerical examples of maximizing the first eigenfrequency, One example...

  16. Maximizing Resource Utilization in Video Streaming Systems

    Science.gov (United States)

    Alsmirat, Mohammad Abdullah

    2013-01-01

    Video streaming has recently grown dramatically in popularity over the Internet, Cable TV, and wire-less networks. Because of the resource demanding nature of video streaming applications, maximizing resource utilization in any video streaming system is a key factor to increase the scalability and decrease the cost of the system. Resources to…

  17. A THEORY OF MAXIMIZING SENSORY INFORMATION

    NARCIS (Netherlands)

    Hateren, J.H. van

    1992-01-01

    A theory is developed on the assumption that early sensory processing aims at maximizing the information rate in the channels connecting the sensory system to more central parts of the brain, where it is assumed that these channels are noisy and have a limited dynamic range. Given a stimulus power

  18. Maximizing scientific knowledge from randomized clinical trials

    DEFF Research Database (Denmark)

    Gustafsson, Finn; Atar, Dan; Pitt, Bertram

    2010-01-01

    Trialists have an ethical and financial responsibility to plan and conduct clinical trials in a manner that will maximize the scientific knowledge gained from the trial. However, the amount of scientific information generated by randomized clinical trials in cardiovascular medicine is highly vari...

  19. A Model of College Tuition Maximization

    Science.gov (United States)

    Bosshardt, Donald I.; Lichtenstein, Larry; Zaporowski, Mark P.

    2009-01-01

    This paper develops a series of models for optimal tuition pricing for private colleges and universities. The university is assumed to be a profit maximizing, price discriminating monopolist. The enrollment decision of student's is stochastic in nature. The university offers an effective tuition rate, comprised of stipulated tuition less financial…

  20. Logit Analysis for Profit Maximizing Loan Classification

    OpenAIRE

    Watt, David L.; Mortensen, Timothy L.; Leistritz, F. Larry

    1988-01-01

    Lending criteria and loan classification methods are developed. Rating system breaking points are analyzed to present a method to maximize loan revenues. Financial characteristics of farmers are used as determinants of delinquency in a multivariate logistic model. Results indicate that debt-to-asset and operating ration are most indicative of default.

  1. Developing maximal neuromuscular power: Part 1--biological basis of maximal power production.

    Science.gov (United States)

    Cormie, Prue; McGuigan, Michael R; Newton, Robert U

    2011-01-01

    This series of reviews focuses on the most important neuromuscular function in many sport performances, the ability to generate maximal muscular power. Part 1 focuses on the factors that affect maximal power production, while part 2, which will follow in a forthcoming edition of Sports Medicine, explores the practical application of these findings by reviewing the scientific literature relevant to the development of training programmes that most effectively enhance maximal power production. The ability of the neuromuscular system to generate maximal power is affected by a range of interrelated factors. Maximal muscular power is defined and limited by the force-velocity relationship and affected by the length-tension relationship. The ability to generate maximal power is influenced by the type of muscle action involved and, in particular, the time available to develop force, storage and utilization of elastic energy, interactions of contractile and elastic elements, potentiation of contractile and elastic filaments as well as stretch reflexes. Furthermore, maximal power production is influenced by morphological factors including fibre type contribution to whole muscle area, muscle architectural features and tendon properties as well as neural factors including motor unit recruitment, firing frequency, synchronization and inter-muscular coordination. In addition, acute changes in the muscle environment (i.e. alterations resulting from fatigue, changes in hormone milieu and muscle temperature) impact the ability to generate maximal power. Resistance training has been shown to impact each of these neuromuscular factors in quite specific ways. Therefore, an understanding of the biological basis of maximal power production is essential for developing training programmes that effectively enhance maximal power production in the human.

  2. Understanding Violations of Gricean Maxims in Preschoolers and Adults

    Directory of Open Access Journals (Sweden)

    Mako eOkanda

    2015-07-01

    Full Text Available This study used a revised Conversational Violations Test to examine Gricean maxim violations in 4- to 6-year-old Japanese children and adults. Participants’ understanding of the following maxims was assessed: be informative (first maxim of quantity, avoid redundancy (second maxim of quantity, be truthful (maxim of quality, be relevant (maxim of relation, avoid ambiguity (second maxim of manner, and be polite (maxim of politeness. Sensitivity to violations of Gricean maxims increased with age: 4-year-olds’ understanding of maxims was near chance, 5-year-olds understood some maxims (first maxim of quantity and maxims of quality, relation, and manner, and 6-year-olds and adults understood all maxims. Preschoolers acquired the maxim of relation first and had the greatest difficulty understanding the second maxim of quantity. Children and adults differed in their comprehension of the maxim of politeness. The development of the pragmatic understanding of Gricean maxims and implications for the construction of developmental tasks from early childhood to adulthood are discussed.

  3. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  4. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  5. Randomized, placebo-controlled trial of mipomersen in patients with severe hypercholesterolemia receiving maximally tolerated lipid-lowering therapy.

    Directory of Open Access Journals (Sweden)

    Mary P McGowan

    Full Text Available Mipomersen, an antisense oligonucleotide targeting apolipoprotein B synthesis, significantly reduces LDL-C and other atherogenic lipoproteins in familial hypercholesterolemia when added to ongoing maximally tolerated lipid-lowering therapy. Safety and efficacy of mipomersen in patients with severe hypercholesterolemia was evaluated.Randomized, double-blind, placebo-controlled, multicenter trial. Patients (n  = 58 were ≥18 years with LDL-C ≥7.8 mmol/L or LDL-C ≥5.1 mmol/L plus CHD disease, on maximally tolerated lipid-lowering therapy that excluded apheresis. Weekly subcutaneous injections of mipomersen 200 mg (n  = 39 or placebo (n  = 19 were added to lipid-lowering therapy for 26 weeks.percent reduction in LDL-C from baseline to 2 weeks after the last dose of treatment. Mipomersen (n = 27 reduced LDL-C by 36%, from a baseline of 7.2 mmol/L, for a mean absolute reduction of 2.6 mmol/L. Conversely, mean LDL-C increased 13% in placebo (n = 18 from a baseline of 6.5 mmol/L (mipomersen vs placebo p<0.001. Mipomersen produced statistically significant (p<0.001 reductions in apolipoprotein B and lipoprotein(a, with no change in high-density lipoprotein cholesterol. Mild-to-moderate injection site reactions were the most frequently reported adverse events with mipomersen. Mild-to-moderate flu-like symptoms were reported more often with mipomersen. Alanine transaminase increase, aspartate transaminase increase, and hepatic steatosis occurred in 21%, 13% and 13% of mipomersen treated patients, respectively. Adverse events by category for the placebo and mipomersen groups respectively were: total adverse events, 16(84.2%, 39(100%; serious adverse events, 0(0%, 6(15.4%; discontinuations due to adverse events, 1(5.3%, 8(20.5% and cardiac adverse events, 1(5.3%, 5(12.8%.Mipomersen significantly reduced LDL-C, apolipoprotein B, total cholesterol and non-HDL-cholesterol, and lipoprotein(a. Mounting evidence suggests it may be a

  6. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different....... Compared to the predictions of an analyst observing untolled equilibrium and taking scheduling preferences as exogenous, we find that both the optimal capacity and the marginal external cost of congestion have changed. The benefits of tolling are greater, and the optimal time varying toll is different....

  7. Joint Scheduling for Dual-Hop Block-Fading Broadcast Channels

    KAUST Repository

    Zafar, Ammar

    2012-09-16

    In this paper, we propose joint user-and-hop scheduling over dual-hop block-fading broadcast channels in order to exploit multi-user diversity gains and multi-hop diversity gains all together. To achieve this objective, the first and second hops are scheduled opportunistically based on the channel state information and as a prerequisite we assume that the relay, which is half-duplex and operates using decode-and-forward, is capable of storing the received packets from the source until the channel condition of the destined user becomes good to be scheduled. We formulate the joint scheduling problem as maximizing the weighted sum of the long term achievable rates by the users under a stability constraint, which means that on the long term the rate received by the relay should equal the rate transmitted by it, in addition to constant or variable power constraints. We show that this problem is equivalent to a single-hop broadcast channel by treating the source as a virtual user with an optimal priority weight that maintains the stability constraint. We show how to obtain the source weight either off-line based on channel statistics or on real-time based on channel measurements. Furthermore, we consider special cases including the maximum sum rate scheduler and the proportional fair scheduler. We demonstrate via numerical results that our proposed joint scheduling scheme enlarges the rate region as compared with a scheme that employs multi-user scheduling alone.

  8. Tumor significant dose

    International Nuclear Information System (INIS)

    Supe, S.J.; Nagalaxmi, K.V.; Meenakshi, L.

    1983-01-01

    In the practice of radiotherapy, various concepts like NSD, CRE, TDF, and BIR are being used to evaluate the biological effectiveness of the treatment schedules on the normal tissues. This has been accepted as the tolerance of the normal tissue is the limiting factor in the treatment of cancers. At present when various schedules are tried, attention is therefore paid to the biological damage of the normal tissues only and it is expected that the damage to the cancerous tissues would be extensive enough to control the cancer. Attempt is made in the present work to evaluate the concent of tumor significant dose (TSD) which will represent the damage to the cancerous tissue. Strandquist in the analysis of a large number of cases of squamous cell carcinoma found that for the 5 fraction/week treatment, the total dose required to bring about the same damage for the cancerous tissue is proportional to T/sup -0.22/, where T is the overall time over which the dose is delivered. Using this finding the TSD was defined as DxN/sup -p/xT/sup -q/, where D is the total dose, N the number of fractions, T the overall time p and q are the exponents to be suitably chosen. The values of p and q are adjusted such that p+q< or =0.24, and p varies from 0.0 to 0.24 and q varies from 0.0 to 0.22. Cases of cancer of cervix uteri treated between 1978 and 1980 in the V. N. Cancer Centre, Kuppuswamy Naidu Memorial Hospital, Coimbatore, India were analyzed on the basis of these formulations. These data, coupled with the clinical experience, were used for choice of a formula for the TSD. Further, the dose schedules used in the British Institute of Radiology fraction- ation studies were also used to propose that the tumor significant dose is represented by DxN/sup -0.18/xT/sup -0.06/

  9. Metaheuristic Approaches for Hydropower System Scheduling

    Directory of Open Access Journals (Sweden)

    Ieda G. Hidalgo

    2015-01-01

    Full Text Available This paper deals with the short-term scheduling problem of hydropower systems. The objective is to meet the daily energy demand in an economic and safe way. The individuality of the generating units and the nonlinearity of their efficiency curves are taken into account. The mathematical model is formulated as a dynamic, mixed integer, nonlinear, nonconvex, combinatorial, and multiobjective optimization problem. We propose two solution methods using metaheuristic approaches. They combine Genetic Algorithm with Strength Pareto Evolutionary Algorithm and Ant Colony Optimization. Both approaches are divided into two phases. In the first one, to maximize the plant’s net generation, the problem is solved for each hour of the day (static dispatch. In the second phase, to minimize the units’ switching on-off, the day is considered as a whole (dynamic dispatch. The proposed methodology is applied to two Brazilian hydroelectric plants, in cascade, that belong to the national interconnected system. The nondominated solutions from both approaches are presented. All of them meet demand respecting the physical, electrical, and hydraulic constraints.

  10. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  11. Maximizing Tumor Immunity With Fractionated Radiation

    Energy Technology Data Exchange (ETDEWEB)

    Schaue, Doerthe, E-mail: dschaue@mednet.ucla.edu [Department of Radiation Oncology, David Geffen School of Medicine at UCLA, Los Angeles, CA (United States); Ratikan, Josephine A.; Iwamoto, Keisuke S.; McBride, William H. [Department of Radiation Oncology, David Geffen School of Medicine at UCLA, Los Angeles, CA (United States)

    2012-07-15

    Purpose: Technologic advances have led to increased clinical use of higher-sized fractions of radiation dose and higher total doses. How these modify the pathways involved in tumor cell death, normal tissue response, and signaling to the immune system has been inadequately explored. Here we ask how radiation dose and fraction size affect antitumor immunity, the suppression thereof, and how this might relate to tumor control. Methods and Materials: Mice bearing B16-OVA murine melanoma were treated with up to 15 Gy radiation given in various-size fractions, and tumor growth followed. The tumor-specific immune response in the spleen was assessed by interferon-{gamma} enzyme-linked immunospot (ELISPOT) assay with ovalbumin (OVA) as the surrogate tumor antigen and the contribution of regulatory T cells (Tregs) determined by the proportion of CD4{sup +}CD25{sup hi}Foxp3{sup +} T cells. Results: After single doses, tumor control increased with the size of radiation dose, as did the number of tumor-reactive T cells. This was offset at the highest dose by an increase in Treg representation. Fractionated treatment with medium-size radiation doses of 7.5 Gy/fraction gave the best tumor control and tumor immunity while maintaining low Treg numbers. Conclusions: Radiation can be an immune adjuvant, but the response varies with the size of dose per fraction. The ultimate challenge is to optimally integrate cancer immunotherapy into radiation therapy.

  12. Maximizing Tumor Immunity With Fractionated Radiation

    International Nuclear Information System (INIS)

    Schaue, Dörthe; Ratikan, Josephine A.; Iwamoto, Keisuke S.; McBride, William H.

    2012-01-01

    Purpose: Technologic advances have led to increased clinical use of higher-sized fractions of radiation dose and higher total doses. How these modify the pathways involved in tumor cell death, normal tissue response, and signaling to the immune system has been inadequately explored. Here we ask how radiation dose and fraction size affect antitumor immunity, the suppression thereof, and how this might relate to tumor control. Methods and Materials: Mice bearing B16-OVA murine melanoma were treated with up to 15 Gy radiation given in various-size fractions, and tumor growth followed. The tumor-specific immune response in the spleen was assessed by interferon-γ enzyme-linked immunospot (ELISPOT) assay with ovalbumin (OVA) as the surrogate tumor antigen and the contribution of regulatory T cells (Tregs) determined by the proportion of CD4 + CD25 hi Foxp3 + T cells. Results: After single doses, tumor control increased with the size of radiation dose, as did the number of tumor-reactive T cells. This was offset at the highest dose by an increase in Treg representation. Fractionated treatment with medium-size radiation doses of 7.5 Gy/fraction gave the best tumor control and tumor immunity while maintaining low Treg numbers. Conclusions: Radiation can be an immune adjuvant, but the response varies with the size of dose per fraction. The ultimate challenge is to optimally integrate cancer immunotherapy into radiation therapy.

  13. Scheduling for dual-hop block-fading channels with two source-user pairs sharing one relay

    KAUST Repository

    Zafar, Ammar

    2013-09-01

    In this paper, we maximize the achievable rate region of a dual-hop network with two sources serving two users independently through a single shared relay. We formulate the problem as maximizing the sum of the weighted long term average throughputs of the two users under stability constraints on the long term throughputs of the source-user pairs. In order to solve the problem, we propose a joint user-and-hop scheduling scheme, which schedules the first or second hop opportunistically based on instantaneous channel state information, in order to exploit multiuser diversity and multihop diversity gains. Numerical results show that the proposed joint scheduling scheme enhances the achievable rate region as compared to a scheme that employs multi-user scheduling on the second-hop alone. Copyright © 2013 by the Institute of Electrical and Electronic Engineers, Inc.

  14. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  15. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  16. How useful are preemptive schedules?

    NARCIS (Netherlands)

    Brucker, P.; Heitmann, S.; Hurink, J.L.

    2001-01-01

    Machine scheduling admits two options to process jobs. In a preemptive mode processing may be interrupted and resumed later even on a different machine. In a nonpreemptive mode interruptions are not allowed. Usually, the possibility to preempt jobs leads to better performance values. However, also

  17. Interaction in activity location scheduling

    NARCIS (Netherlands)

    Tabak, V.; Vries, de B.; Dijkstra, J.; Jessurun, A.J.

    2006-01-01

    In this paper we discuss the interaction in activity location scheduling which is the main subject of an ongoing research project called "User Simulation of Space Utilization". The aim of this research project is to develop an overall model for the simulation of human movement and utilization of

  18. Scheduling with target start times

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.; Klein Haneveld, W.K.; Vrieze, O.J.; Kallenberg, L.C.M.

    1997-01-01

    We address the single-machine problem of scheduling n independent jobs subject to target start times. Target start times are essentially release times that may be violated at a certain cost. The goal is to minimize an objective function that is composed of total completion time and maximum

  19. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  20. Flexible Schedules and Shift Work.

    Science.gov (United States)

    Beers, Thomas M.

    2000-01-01

    Flexible work hours have gained prominence, as more than 25 million workers (27.6% of all full-time workers) can now vary their schedules. However, there has been little change since the mid-1980s in the proportion who work a shift other than a regular daytime shift. (JOW)

  1. Scheduling periodic tasks with slack

    NARCIS (Netherlands)

    Korst, J.H.M.; Aarts, E.H.L.; Lenstra, J.K.

    1997-01-01

    We consider the problem of nonpreemptively scheduling periodic tasks on a minimum number of identical processors, assuming that some slack is allowed in the time between successive executions of a periodic task. We prove that the problem is NP-hard in the strong sense. Necessary and sufficient

  2. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    replace earlier versions of the F/A-18. Joint and International Nature At the time of JSF conception, there was a clear preference at the highest levels...ALPHABET SOUP ” (Aboulafia, 2015) OF STUDIES AND CONCEPTS • … MERGED INTO JAST • … WHICH EVOLVED TO JSF • WELL-KNOWN COST AND SCHEDULE

  3. Analyzing NPS Scheduling Using OSIRIS

    Science.gov (United States)

    1993-03-01

    School TEACHER SCHEDULE BLOCKS REPORT Date: 2/19/93 Period Name ID Term Days 1234 Adragna , Joe 170401 1 F xx Agrawal, Brij 120101 1 F xx Almquist...LOAD REPORT Date: 3/18/93 Total Max Consec Total Teacher ID Term Classes Classes Stud Adragna , Joe 170401 1 1 1 3 Agrawal, Brij 120101 1 2 2 98 Aiello

  4. Refined reservoir description to maximize oil recovery

    International Nuclear Information System (INIS)

    Flewitt, W.E.

    1975-01-01

    To assure maximized oil recovery from older pools, reservoir description has been advanced by fully integrating original open-hole logs and the recently introduced interpretive techniques made available through cased-hole wireline saturation logs. A refined reservoir description utilizing normalized original wireline porosity logs has been completed in the Judy Creek Beaverhill Lake ''A'' Pool, a reefal carbonate pool with current potential productivity of 100,000 BOPD and 188 active wells. Continuous porosity was documented within a reef rim and cap while discontinuous porous lenses characterized an interior lagoon. With the use of pulsed neutron logs and production data a separate water front and pressure response was recognized within discrete environmental units. The refined reservoir description aided in reservoir simulation model studies and quantifying pool performance. A pattern water flood has now replaced the original peripheral bottom water drive to maximize oil recovery

  5. Maximal frustration as an immunological principle.

    Science.gov (United States)

    de Abreu, F Vistulo; Mostardinha, P

    2009-03-06

    A fundamental problem in immunology is that of understanding how the immune system selects promptly which cells to kill without harming the body. This problem poses an apparent paradox. Strong reactivity against pathogens seems incompatible with perfect tolerance towards self. We propose a different view on cellular reactivity to overcome this paradox: effector functions should be seen as the outcome of cellular decisions which can be in conflict with other cells' decisions. We argue that if cellular systems are frustrated, then extensive cross-reactivity among the elements in the system can decrease the reactivity of the system as a whole and induce perfect tolerance. Using numerical and mathematical analyses, we discuss two simple models that perform optimal pathogenic detection with no autoimmunity if cells are maximally frustrated. This study strongly suggests that a principle of maximal frustration could be used to build artificial immune systems. It would be interesting to test this principle in the real adaptive immune system.

  6. Derivative pricing based on local utility maximization

    OpenAIRE

    Jan Kallsen

    2002-01-01

    This paper discusses a new approach to contingent claim valuation in general incomplete market models. We determine the neutral derivative price which occurs if investors maximize their local utility and if derivative demand and supply are balanced. We also introduce the sensitivity process of a contingent claim. This process quantifies the reliability of the neutral derivative price and it can be used to construct price bounds. Moreover, it allows to calibrate market models in order to be co...

  7. Control of Shareholders’ Wealth Maximization in Nigeria

    OpenAIRE

    A. O. Oladipupo; C. O. Okafor

    2014-01-01

    This research focuses on who controls shareholder’s wealth maximization and how does this affect firm’s performance in publicly quoted non-financial companies in Nigeria. The shareholder fund was the dependent while explanatory variables were firm size (proxied by log of turnover), retained earning (representing management control) and dividend payment (representing measure of shareholders control). The data used for this study were obtained from the Nigerian Stock Exchange [NSE] fact book an...

  8. Definable maximal discrete sets in forcing extensions

    DEFF Research Database (Denmark)

    Törnquist, Asger Dag; Schrittesser, David

    2018-01-01

    Let  be a Σ11 binary relation, and recall that a set A is -discrete if no two elements of A are related by . We show that in the Sacks and Miller forcing extensions of L there is a Δ12 maximal -discrete set. We use this to answer in the negative the main question posed in [5] by showing...

  9. Dynamic Convex Duality in Constrained Utility Maximization

    OpenAIRE

    Li, Yusong; Zheng, Harry

    2016-01-01

    In this paper, we study a constrained utility maximization problem following the convex duality approach. After formulating the primal and dual problems, we construct the necessary and sufficient conditions for both the primal and dual problems in terms of FBSDEs plus additional conditions. Such formulation then allows us to explicitly characterize the primal optimal control as a function of the adjoint process coming from the dual FBSDEs in a dynamic fashion and vice versa. Moreover, we also...

  10. Single maximal versus combination punch kinematics.

    Science.gov (United States)

    Piorkowski, Barry A; Lees, Adrian; Barton, Gabor J

    2011-03-01

    The aim of this study was to determine the influence of punch type (Jab, Cross, Lead Hook and Reverse Hook) and punch modality (Single maximal, 'In-synch' and 'Out of synch' combination) on punch speed and delivery time. Ten competition-standard volunteers performed punches with markers placed on their anatomical landmarks for 3D motion capture with an eight-camera optoelectronic system. Speed and duration between key moments were computed. There were significant differences in contact speed between punch types (F(2,18,84.87) = 105.76, p = 0.001) with Lead and Reverse Hooks developing greater speed than Jab and Cross. There were significant differences in contact speed between punch modalities (F(2,64,102.87) = 23.52, p = 0.001) with the Single maximal (M+/- SD: 9.26 +/- 2.09 m/s) higher than 'Out of synch' (7.49 +/- 2.32 m/s), 'In-synch' left (8.01 +/- 2.35 m/s) or right lead (7.97 +/- 2.53 m/s). Delivery times were significantly lower for Jab and Cross than Hook. Times were significantly lower 'In-synch' than a Single maximal or 'Out of synch' combination mode. It is concluded that a defender may have more evasion-time than previously reported. This research could be of use to performers and coaches when considering training preparations.

  11. Formation Control for the MAXIM Mission

    Science.gov (United States)

    Luquette, Richard J.; Leitner, Jesse; Gendreau, Keith; Sanner, Robert M.

    2004-01-01

    Over the next twenty years, a wave of change is occurring in the space-based scientific remote sensing community. While the fundamental limits in the spatial and angular resolution achievable in spacecraft have been reached, based on today s technology, an expansive new technology base has appeared over the past decade in the area of Distributed Space Systems (DSS). A key subset of the DSS technology area is that which covers precision formation flying of space vehicles. Through precision formation flying, the baselines, previously defined by the largest monolithic structure which could fit in the largest launch vehicle fairing, are now virtually unlimited. Several missions including the Micro-Arcsecond X-ray Imaging Mission (MAXIM), and the Stellar Imager will drive the formation flying challenges to achieve unprecedented baselines for high resolution, extended-scene, interferometry in the ultraviolet and X-ray regimes. This paper focuses on establishing the feasibility for the formation control of the MAXIM mission. MAXIM formation flying requirements are on the order of microns, while Stellar Imager mission requirements are on the order of nanometers. This paper specifically addresses: (1) high-level science requirements for these missions and how they evolve into engineering requirements; and (2) the development of linearized equations of relative motion for a formation operating in an n-body gravitational field. Linearized equations of motion provide the ground work for linear formation control designs.

  12. Gradient Dynamics and Entropy Production Maximization

    Science.gov (United States)

    Janečka, Adam; Pavelka, Michal

    2018-01-01

    We compare two methods for modeling dissipative processes, namely gradient dynamics and entropy production maximization. Both methods require similar physical inputs-how energy (or entropy) is stored and how it is dissipated. Gradient dynamics describes irreversible evolution by means of dissipation potential and entropy, it automatically satisfies Onsager reciprocal relations as well as their nonlinear generalization (Maxwell-Onsager relations), and it has statistical interpretation. Entropy production maximization is based on knowledge of free energy (or another thermodynamic potential) and entropy production. It also leads to the linear Onsager reciprocal relations and it has proven successful in thermodynamics of complex materials. Both methods are thermodynamically sound as they ensure approach to equilibrium, and we compare them and discuss their advantages and shortcomings. In particular, conditions under which the two approaches coincide and are capable of providing the same constitutive relations are identified. Besides, a commonly used but not often mentioned step in the entropy production maximization is pinpointed and the condition of incompressibility is incorporated into gradient dynamics.

  13. The role of the production scheduling system in rescheduling

    Science.gov (United States)

    Kalinowski, K.; Grabowik, C.; Kempa, W.; Paprocka, I.

    2015-11-01

    The paper presents the rescheduling problem in the context of cooperation between production scheduling system (PSS) and other units in an integrated manufacturing environment - decision makers and software systems. The main aim is to discuss the PSS functionality for maximizing automation of the rescheduling process, reducing the response time and improving the quality of generated solutions. PSSs operate in the meeting of tactical and operational level of planning and control, and play an important role in the production preparation and control. On the basis of information about orders, technology and production system state (e.g. resources availability) they prepare and/or update a detailed plan of production flow - a schedule. All necessary data for scheduling and rescheduling are usually collected in other systems both from organizational and technical production preparation, e.g. ERP, PLM, MES, CAPP or others, as well as they are entered directly by the decision- makers/operators. Data acquired in this way are often incomplete and inconsistent. Therefore the existing rescheduling software works according to interactive method - rather support but does not replace the human decision maker in tasks planning. When rescheduling, due to the limited amount of time to make a decision this interaction is particularly important. An additional problem arises in data acquisition, in the process of data exchanging between systems or in the identification of new data sources and their processing. Different approaches to rescheduling were characterized, including those solutions, where all these operations are carried out by an autonomous system and those in which scheduling is performed only upon request from the outside, for the newly created scheduling data representing the current state of the production system.

  14. Cardiorespiratory Coordination in Repeated Maximal Exercise

    Directory of Open Access Journals (Sweden)

    Sergi Garcia-Retortillo

    2017-06-01

    Full Text Available Increases in cardiorespiratory coordination (CRC after training with no differences in performance and physiological variables have recently been reported using a principal component analysis approach. However, no research has yet evaluated the short-term effects of exercise on CRC. The aim of this study was to delineate the behavior of CRC under different physiological initial conditions produced by repeated maximal exercises. Fifteen participants performed 2 consecutive graded and maximal cycling tests. Test 1 was performed without any previous exercise, and Test 2 6 min after Test 1. Both tests started at 0 W and the workload was increased by 25 W/min in males and 20 W/min in females, until they were not able to maintain the prescribed cycling frequency of 70 rpm for more than 5 consecutive seconds. A principal component (PC analysis of selected cardiovascular and cardiorespiratory variables (expired fraction of O2, expired fraction of CO2, ventilation, systolic blood pressure, diastolic blood pressure, and heart rate was performed to evaluate the CRC defined by the number of PCs in both tests. In order to quantify the degree of coordination, the information entropy was calculated and the eigenvalues of the first PC (PC1 were compared between tests. Although no significant differences were found between the tests with respect to the performed maximal workload (Wmax, maximal oxygen consumption (VO2 max, or ventilatory threshold (VT, an increase in the number of PCs and/or a decrease of eigenvalues of PC1 (t = 2.95; p = 0.01; d = 1.08 was found in Test 2 compared to Test 1. Moreover, entropy was significantly higher (Z = 2.33; p = 0.02; d = 1.43 in the last test. In conclusion, despite the fact that no significant differences were observed in the conventionally explored maximal performance and physiological variables (Wmax, VO2 max, and VT between tests, a reduction of CRC was observed in Test 2. These results emphasize the interest of CRC

  15. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  16. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  17. Throughput maximization for buffer-aided hybrid half-/full-duplex relaying with self-interference

    KAUST Repository

    Khafagy, Mohammad Galal

    2015-06-01

    In this work, we consider a two-hop cooperative setting where a source communicates with a destination through an intermediate relay node with a buffer. Unlike the existing body of work on buffer-aided half-duplex relaying, we consider a hybrid half-/full-duplex relaying scenario with loopback interference in the full-duplex mode. Depending on the channel outage and buffer states that are assumed available at the transmitters, the source and relay may either transmit simultaneously or revert to orthogonal transmission. Specifically, a joint source/relay scheduling and relaying mode selection mechanism is proposed to maximize the end-to-end throughput. The throughput maximization problem is converted to a linear program where the exact global optimal solution is efficiently obtained via standard convex/linear numerical optimization tools. Finally, the theoretical findings are corroborated with event-based simulations to provide the necessary performance validation.

  18. Designing a Profit-Maximizing Critical Peak Pricing Scheme Considering the Payback Phenomenon

    Directory of Open Access Journals (Sweden)

    Sung Chan Park

    2015-10-01

    Full Text Available Critical peak pricing (CPP is a demand response program that can be used to maximize profits for a load serving entity in a deregulated market environment. Like other such programs, however, CPP is not free from the payback phenomenon: a rise in consumption after a critical event. This payback has a negative effect on profits and thus must be appropriately considered when designing a CPP scheme. However, few studies have examined CPP scheme design considering payback. This study thus characterizes payback using three parameters (duration, amount, and pattern and examines payback effects on the optimal schedule of critical events and on the optimal peak rate for two specific payback patterns. This analysis is verified through numerical simulations. The results demonstrate the need to properly consider payback parameters when designing a profit-maximizing CPP scheme.

  19. Standard effective doses for proliferative tumours

    International Nuclear Information System (INIS)

    Jones, L.C.; Hoban, P.

    1999-01-01

    This study was undertaken to investigate the treatment schedules used clinically for highly proliferative tumours, particularly with reference to the effects of fraction size, fraction number and treatment duration. The linear quadratic model (with time component) is used here to compare non-standard treatment regimens (e.g. accelerated and hyperfractionated schedules), currently the focus of randomized trials, with each other and some common 'standard regimens'. To ensure easy interpretation of results, two parameters known as proliferative standard effective dose one (PSED 1 ) and proliferative standard effective dose two (PSED 2 ) have been calculated for each regimen. Graphs of PSED 1 and PSED 2 versus potential doubling time (T p ) have been generated for a range of fractionation regimens which are currently under trial in various randomized studies. From these graphs it can be seen that the highly accelerated schedules (such as CHART) only show advantages for tumours with very short potential doubling times. Calculations for most of the schedules considered showed at least equivalent tumour control expected for the trial schedule compared with the control arm used and these values agree quite well with clinical results. These calculations are in good agreement with clinical results available at present. The greater the PSED 1 or PSED 2 for the schedule considered the greater the tumour control, which can be expected. However, as has been seen with clinical trials, this higher cell kill also results in higher acute effects which have proved too great for some accelerated schedules to continue. (author)

  20. Calculation methods for determining dose equivalent

    International Nuclear Information System (INIS)

    Endres, G.W.R.; Tanner, J.E.; Scherpelz, R.I.; Hadlock, D.E.

    1987-11-01

    A series of calculations of neutron fluence as a function of energy in an anthropomorphic phantom was performed to develop a system for determining effective dose equivalent for external radiation sources. Critical organ dose equivalents are calculated and effective dose equivalents are determined using ICRP-26 [1] methods. Quality factors based on both present definitions and ICRP-40 definitions are used in the analysis. The results of these calculations are presented and discussed. The effective dose equivalent determined using ICRP-26 methods is significantly smaller than the dose equivalent determined by traditional methods. No existing personnel dosimeter or health physics instrument can determine effective dose equivalent. At the present time, the conversion of dosimeter response to dose equivalent is based on calculations for maximal or ''cap'' values using homogeneous spherical or cylindrical phantoms. The evaluated dose equivalent is, therefore, a poor approximation of the effective dose equivalent as defined by ICRP Publication 26. 3 refs., 2 figs., 1 tab

  1. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker cons...... consumption and the impact on the remaining network and the customer service level. The model is applied to 4 real cases from Maersk Line. Solutions are comparable or superior to those chosen by operations managers. Cost savings of up to 58% may be achieved.......Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  2. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  3. Dose escalation of the hypoxic cell sensitizer etanidazole combined with ifosfamide, carboplatin, etoposide, and autologous hematopoietic stem cell support.

    Science.gov (United States)

    Elias, A D; Wheeler, C; Ayash, L J; Schwartz, G; Ibrahim, J; Mills, L; McCauley, M; Coleman, N; Warren, D; Schnipper, L; Antman, K H; Teicher, B A; Frei, E

    1998-06-01

    , predominantly in stocking glove distribution, occurring between day -3 and day 0, and a sensory peripheral neuropathy with similar distribution peaking around day +60. The maximal achievable dose of etanidazole (16 g/m2 dose level) resulted in a mean serum level of 38 micrograms/ml (25-55 micrograms/ml). Etanidazole significantly enhanced host toxicity of high-dose ICE. Effective modulatory doses of etanidazole could not be given with acceptable toxicity using this schedule.

  4. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  5. Postactivation potentiation biases maximal isometric strength assessment.

    Science.gov (United States)

    Lima, Leonardo Coelho Rabello; Oliveira, Felipe Bruno Dias; Oliveira, Thiago Pires; Assumpção, Claudio de Oliveira; Greco, Camila Coelho; Cardozo, Adalgiso Croscato; Denadai, Benedito Sérgio

    2014-01-01

    Postactivation potentiation (PAP) is known to enhance force production. Maximal isometric strength assessment protocols usually consist of two or more maximal voluntary isometric contractions (MVCs). The objective of this study was to determine if PAP would influence isometric strength assessment. Healthy male volunteers (n = 23) performed two five-second MVCs separated by a 180-seconds interval. Changes in isometric peak torque (IPT), time to achieve it (tPTI), contractile impulse (CI), root mean square of the electromyographic signal during PTI (RMS), and rate of torque development (RTD), in different intervals, were measured. Significant increases in IPT (240.6 ± 55.7 N·m versus 248.9 ± 55.1 N·m), RTD (746 ± 152 N·m·s(-1) versus 727 ± 158 N·m·s(-1)), and RMS (59.1 ± 12.2% RMSMAX  versus 54.8 ± 9.4% RMSMAX) were found on the second MVC. tPTI decreased significantly on the second MVC (2373 ± 1200 ms versus 2784 ± 1226 ms). We conclude that a first MVC leads to PAP that elicits significant enhancements in strength-related variables of a second MVC performed 180 seconds later. If disconsidered, this phenomenon might bias maximal isometric strength assessment, overestimating some of these variables.

  6. Gain maximization in a probabilistic entanglement protocol

    Science.gov (United States)

    di Lorenzo, Antonio; Esteves de Queiroz, Johnny Hebert

    Entanglement is a resource. We can therefore define gain as a monotonic function of entanglement G (E) . If a pair with entanglement E is produced with probability P, the net gain is N = PG (E) - (1 - P) C , where C is the cost of a failed attempt. We study a protocol where a pair of quantum systems is produced in a maximally entangled state ρm with probability Pm, while it is produced in a partially entangled state ρp with the complementary probability 1 -Pm . We mix a fraction w of the partially entangled pairs with the maximally entangled ones, i.e. we take the state to be ρ = (ρm + wUlocρpUloc+) / (1 + w) , where Uloc is an appropriate unitary local operation designed to maximize the entanglement of ρ. This procedure on one hand reduces the entanglement E, and hence the gain, but on the other hand it increases the probability of success to P =Pm + w (1 -Pm) , therefore the net gain N may increase. There may be hence, a priori, an optimal value for w, the fraction of failed attempts that we mix in. We show that, in the hypothesis of a linear gain G (E) = E , even assuming a vanishing cost C -> 0 , the net gain N is increasing with w, therefore the best strategy is to always mix the partially entangled states. Work supported by CNPq, Conselho Nacional de Desenvolvimento Científico e Tecnológico, proc. 311288/2014-6, and by FAPEMIG, Fundação de Amparo à Pesquisa de Minas Gerais, proc. IC-FAPEMIG2016-0269 and PPM-00607-16.

  7. Preemptive scheduling in overloaded systems

    Czech Academy of Sciences Publication Activity Database

    Chrobak, M.; Epstein, L.; Noga, J.; Sgall, Jiří; van Stee, R.; Tichý, Tomáš; Vakhania, N.

    2003-01-01

    Roč. 67, č. 1 (2003), s. 183-197 ISSN 0022-0000 R&D Projects: GA ČR GA201/01/1195; GA MŠk ME 476; GA AV ČR IAA1019901; GA MŠk LN00A056 Institutional research plan: CEZ:AV0Z1019905; CEZ:AV0Z1019905 Keywords : scheduling * online algorithms * benefit Subject RIV: BA - General Mathematics Impact factor: 0.795, year: 2003

  8. WCET Analysis for Preemptive Scheduling

    OpenAIRE

    Altmeyer, Sebastian; Gebhard, Gernot

    2008-01-01

    Hard real-time systems induce strict constraints on the timing of the task set. Validation of these timing constraints is thus a major challenge during the design of such a system. Whereas the derivation of timing guarantees must already be considered complex if tasks are running to completion, it gets even more complex if tasks are scheduled preemptively -- especially due to caches, deployed to improve the average performance. In this paper we propose a new method to compu...

  9. Scheduling Maintenance Jobs in Networks

    OpenAIRE

    Abed, Fidaa; Chen, Lin; Disser, Yann; Groß, Martin; Megow, Nicole; Meißner, Julie; Richter, Alexander T.; Rischke, Roman

    2017-01-01

    We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time; for the special case of path networks, this is related to the problem of minimizing the busy time of machines. We show that the problem can be solved in polynomial time in arbitrary networks if preemption is allowed. If preemption is restricted to integral t...

  10. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  11. Broadcast scheduling for mobile advertising

    OpenAIRE

    De Reyck, B.; Degraeve, Z.

    2003-01-01

    We describe a broadcast scheduling system developed for a precision marketing firm specialized in location-sensitive permission-based mobile advertising using SMS (Short Message Service) text messaging. Text messages containing advertisements were sent to registered customers when they were shopping in one of two shopping centers in the vicinity of London. The ads typically contained a limited-time promotional offer. The company's problem was deciding which ads to send out to which customers ...

  12. Schedule of the nuclear program

    International Nuclear Information System (INIS)

    Heigl, F.

    1977-01-01

    The lecure tries to explain the main phases which must be passed to establish nuclear power plants, the feasibility phase, preconstruction and construction phase. Each phase consists of a lot of activities which are commented. Further the lecture tries to give some ideas of durances and dependence between the phases or activities to get a complete time schedule of the realization of a nuclear power project. (HP) [de

  13. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  14. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  15. Solving Flexible Job-Shop Scheduling Problem Using Gravitational Search Algorithm and Colored Petri Net

    Directory of Open Access Journals (Sweden)

    Behnam Barzegar

    2012-01-01

    Full Text Available Scheduled production system leads to avoiding stock accumulations, losses reduction, decreasing or even eliminating idol machines, and effort to better benefitting from machines for on time responding customer orders and supplying requested materials in suitable time. In flexible job-shop scheduling production systems, we could reduce time and costs by transferring and delivering operations on existing machines, that is, among NP-hard problems. The scheduling objective minimizes the maximal completion time of all the operations, which is denoted by Makespan. Different methods and algorithms have been presented for solving this problem. Having a reasonable scheduled production system has significant influence on improving effectiveness and attaining to organization goals. In this paper, new algorithm were proposed for flexible job-shop scheduling problem systems (FJSSP-GSPN that is based on gravitational search algorithm (GSA. In the proposed method, the flexible job-shop scheduling problem systems was modeled by color Petri net and CPN tool and then a scheduled job was programmed by GSA algorithm. The experimental results showed that the proposed method has reasonable performance in comparison with other algorithms.

  16. Scheduling algorithms for saving energy and balancing load

    Energy Technology Data Exchange (ETDEWEB)

    Antoniadis, Antonios

    2012-08-03

    In this thesis we study problems of scheduling tasks in computing environments. We consider both the modern objective function of minimizing energy consumption, and the classical objective of balancing load across machines. We first investigate offline deadline-based scheduling in the setting of a single variable-speed processor that is equipped with a sleep state. The objective is that of minimizing the total energy consumption. Apart from settling the complexity of the problem by showing its NP-hardness, we provide a lower bound of 2 for general convex power functions, and a particular natural class of schedules called s{sub crit}-schedules. We also present an algorithmic framework for designing good approximation algorithms. For general convex power functions our framework improves the best known approximation-factor from 2 to 4/3. This factor can be reduced even further to 137/117 for a specific well-motivated class of power functions. Furthermore, we give tight bounds to show that our framework returns optimal s{sub crit}-schedules for the two aforementioned power-function classes. We then focus on the multiprocessor setting where each processor has the ability to vary its speed. Job migration is allowed, and we again consider classical deadline-based scheduling with the objective of energy minimization. We first study the offline problem and show that optimal schedules can be computed efficiently in polynomial time for any convex and non-decreasing power function. Our algorithm relies on repeated maximum flow computations. Regarding the online problem and power functions P(s) = s{sup {alpha}}, where s is the processor speed and {alpha} > 1 a constant, we extend the two well-known single-processor algorithms Optimal Available and Average Rate. We prove that Optimal Available is {alpha}{sup {alpha}}-competitive as in the single-processor case. For Average Rate we show a competitive factor of (2{alpha}){sup {alpha}}/2 + 1, i.e., compared to the single

  17. Planning and scheduling for petroleum refineries using mathematical programming

    Directory of Open Access Journals (Sweden)

    Joly M.

    2002-01-01

    Full Text Available The objective of this paper is the development and solution of nonlinear and mixed-integer (MIP optimization models for real-world planning and scheduling problems in petroleum refineries. Firstly, we present a nonlinear planning model that represents a general refinery topology and allows implementation of nonlinear process models as well as blending relations. The optimization model is able to define new operating points, thus increasing the production of the more valuable products and simultaneously satisfying all specification constraints. The second part addresses scheduling problems in oil refineries, which are formulated as MIP optimization models and rely on both continuous and discrete time representations. Three practical applications closely related to the current refinery scenario are presented. The first one addresses the problem of crude oil inventory management of a refinery that receives several types of crude oil delivered exclusively by a single oil pipeline. Subsequently, two optimization models intended to define the optimal production policy, inventory control and distribution are proposed and solved for the fuel oil and asphalt plant. Finally, the planning model of Moro et al. (1998 is extended in order to sequence decisions at the scheduling level in the liquefied petroleum gas (LPG area for maximization of the production of petrochemical-grade propane and product delivery.

  18. Sort-Mid tasks scheduling algorithm in grid computing

    Directory of Open Access Journals (Sweden)

    Naglaa M. Reda

    2015-11-01

    Full Text Available Scheduling tasks on heterogeneous resources distributed over a grid computing system is an NP-complete problem. The main aim for several researchers is to develop variant scheduling algorithms for achieving optimality, and they have shown a good performance for tasks scheduling regarding resources selection. However, using of the full power of resources is still a challenge. In this paper, a new heuristic algorithm called Sort-Mid is proposed. It aims to maximizing the utilization and minimizing the makespan. The new strategy of Sort-Mid algorithm is to find appropriate resources. The base step is to get the average value via sorting list of completion time of each task. Then, the maximum average is obtained. Finally, the task has the maximum average is allocated to the machine that has the minimum completion time. The allocated task is deleted and then, these steps are repeated until all tasks are allocated. Experimental tests show that the proposed algorithm outperforms almost other algorithms in terms of resources utilization and makespan.

  19. Sort-Mid tasks scheduling algorithm in grid computing.

    Science.gov (United States)

    Reda, Naglaa M; Tawfik, A; Marzok, Mohamed A; Khamis, Soheir M

    2015-11-01

    Scheduling tasks on heterogeneous resources distributed over a grid computing system is an NP-complete problem. The main aim for several researchers is to develop variant scheduling algorithms for achieving optimality, and they have shown a good performance for tasks scheduling regarding resources selection. However, using of the full power of resources is still a challenge. In this paper, a new heuristic algorithm called Sort-Mid is proposed. It aims to maximizing the utilization and minimizing the makespan. The new strategy of Sort-Mid algorithm is to find appropriate resources. The base step is to get the average value via sorting list of completion time of each task. Then, the maximum average is obtained. Finally, the task has the maximum average is allocated to the machine that has the minimum completion time. The allocated task is deleted and then, these steps are repeated until all tasks are allocated. Experimental tests show that the proposed algorithm outperforms almost other algorithms in terms of resources utilization and makespan.

  20. Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers

    Directory of Open Access Journals (Sweden)

    Jianhong Hao

    2015-01-01

    Full Text Available We consider the nonstandard parts supply chain with a public service platform for machinery integration in China. The platform assigns orders placed by a machinery enterprise to multiple independent manufacturers who produce nonstandard parts and makes production schedule and batch delivery schedule for each manufacturer in a coordinate manner. Each manufacturer has only one plant with parallel machines and is located at a location far away from other manufacturers. Orders are first processed at the plants and then directly shipped from the plants to the enterprise in order to be finished before a given deadline. We study the above integrated production-distribution scheduling problem with multiple manufacturers to maximize a weight sum of the profit of each manufacturer under the constraints that all orders are finished before the deadline and the profit of each manufacturer is not negative. According to the optimal condition analysis, we formulate the problem as a mixed integer programming model and use CPLEX to solve it.

  1. Maximizing percentage depletion in solid minerals

    International Nuclear Information System (INIS)

    Tripp, J.; Grove, H.D.; McGrath, M.

    1982-01-01

    This article develops a strategy for maximizing percentage depletion deductions when extracting uranium or other solid minerals. The goal is to avoid losing percentage depletion deductions by staying below the 50% limitation on taxable income from the property. The article is divided into two major sections. The first section is comprised of depletion calculations that illustrate the problem and corresponding solutions. The last section deals with the feasibility of applying the strategy and complying with the Internal Revenue Code and appropriate regulations. Three separate strategies or appropriate situations are developed and illustrated. 13 references, 3 figures, 7 tables

  2. What currency do bumble bees maximize?

    Directory of Open Access Journals (Sweden)

    Nicholas L Charlton

    2010-08-01

    Full Text Available In modelling bumble bee foraging, net rate of energetic intake has been suggested as the appropriate currency. The foraging behaviour of honey bees is better predicted by using efficiency, the ratio of energetic gain to expenditure, as the currency. We re-analyse several studies of bumble bee foraging and show that efficiency is as good a currency as net rate in terms of predicting behaviour. We suggest that future studies of the foraging of bumble bees should be designed to distinguish between net rate and efficiency maximizing behaviour in an attempt to discover which is the more appropriate currency.

  3. New Maximal Two-distance Sets

    DEFF Research Database (Denmark)

    Lisonek, Petr

    1996-01-01

    A two-distance set in E^d is a point set X inthe d-dimensional Euclidean spacesuch that the distances between distinct points in Xassume only two different non-zero values. Based on results from classical distance geometry, we developan algorithm to classify, for a given dimension, all maximal...... (largest possible)two-distance sets in E^d.Using this algorithm we have completed the full classificationfor all dimensions less than or equal to 7, andwe have found one set in E^8 whosemaximality follows from Blokhuis' upper bound on sizes of s-distance sets.While in the dimensions less than or equal to 6...

  4. Maximizing policy learning in international committees

    DEFF Research Database (Denmark)

    Nedergaard, Peter

    2007-01-01

    , this article demonstrates that valuable lessons can be learned about policy learning, in practice and theoretically, by analysing the cooperation in the OMC committees. Using the Advocacy Coalition Framework as the starting point of analysis, 15 hypotheses on policy learning are tested. Among other things......, it is concluded that in order to maximize policy learning in international committees, empirical data should be made available to committees and provided by sources close to the participants (i.e. the Commission). In addition, the work in the committees should be made prestigious in order to attract well...

  5. Pouliot type duality via a-maximization

    International Nuclear Information System (INIS)

    Kawano, Teruhiko; Ookouchi, Yutaka; Tachikawa, Yuji; Yagi, Futoshi

    2006-01-01

    We study four-dimensional N=1Spin(10) gauge theory with a single spinor and N Q vectors at the superconformal fixed point via the electric-magnetic duality and a-maximization. When gauge invariant chiral primary operators hit the unitarity bounds, we find that the theory with no superpotential is identical to the one with some superpotential at the infrared fixed point. The auxiliary field method in the electric theory offers a satisfying description of the infrared fixed point, which is consistent with the better picture in the magnetic theory. In particular, it gives a clear description of the emergence of new massless degrees of freedom in the electric theory

  6. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  7. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  8. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  9. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  10. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  11. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  12. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  13. Developing maximal neuromuscular power: part 2 - training considerations for improving maximal power production.

    Science.gov (United States)

    Cormie, Prue; McGuigan, Michael R; Newton, Robert U

    2011-02-01

    This series of reviews focuses on the most important neuromuscular function in many sport performances: the ability to generate maximal muscular power. Part 1, published in an earlier issue of Sports Medicine, focused on the factors that affect maximal power production while part 2 explores the practical application of these findings by reviewing the scientific literature relevant to the development of training programmes that most effectively enhance maximal power production. The ability to generate maximal power during complex motor skills is of paramount importance to successful athletic performance across many sports. A crucial issue faced by scientists and coaches is the development of effective and efficient training programmes that improve maximal power production in dynamic, multi-joint movements. Such training is referred to as 'power training' for the purposes of this review. Although further research is required in order to gain a deeper understanding of the optimal training techniques for maximizing power in complex, sports-specific movements and the precise mechanisms underlying adaptation, several key conclusions can be drawn from this review. First, a fundamental relationship exists between strength and power, which dictates that an individual cannot possess a high level of power without first being relatively strong. Thus, enhancing and maintaining maximal strength is essential when considering the long-term development of power. Second, consideration of movement pattern, load and velocity specificity is essential when designing power training programmes. Ballistic, plyometric and weightlifting exercises can be used effectively as primary exercises within a power training programme that enhances maximal power. The loads applied to these exercises will depend on the specific requirements of each particular sport and the type of movement being trained. The use of ballistic exercises with loads ranging from 0% to 50% of one-repetition maximum (1RM) and

  14. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  15. Fractionated total body irradiation; the gastrointestinal toxicity versus the conditioning effect for bone marrow transplantation with different fractionation schedules

    International Nuclear Information System (INIS)

    Walma, E.P.; Klapwijk, W.M.; Miller, A.M.

    1982-01-01

    In most cases, bone marrow transplantation is preceded by a conditioning regimen employing irradiation and/or cytotoxic drugs. The authors are searching for better fractionation schedules in order to optimize the conditioning regimen prior to transplantation of stem-cell-enriched bone marrow. They have determined damage to the gastrointestinal tract in dogs and mice after total body irradiation in mice and dogs following a number of fractionation schedules, and these results are presented. The schedules were chosen such as to minimize the interval between irradiation and the bone marrow transplantation and to maximize clinical feasibility. (Auth./C.F.)

  16. Maximization techniques for oilfield development profits

    International Nuclear Information System (INIS)

    Lerche, I.

    1999-01-01

    In 1981 Nind provided a quantitative procedure for estimating the optimum number of development wells to emplace on an oilfield to maximize profit. Nind's treatment assumed that there was a steady selling price, that all wells were placed in production simultaneously, and that each well's production profile was identical and a simple exponential decline with time. This paper lifts these restrictions to allow for price fluctuations, variable with time emplacement of wells, and production rates that are more in line with actual production records than is a simple exponential decline curve. As a consequence, it is possible to design production rate strategies, correlated with price fluctuations, so as to maximize the present-day worth of a field. For price fluctuations that occur on a time-scale rapid compared to inflation rates it is appropriate to have production rates correlate directly with such price fluctuations. The same strategy does not apply for price fluctuations occurring on a time-scale long compared to inflation rates where, for small amplitudes in the price fluctuations, it is best to sell as much product as early as possible to overcome inflation factors, while for large amplitude fluctuations the best strategy is to sell product as early as possible but to do so mainly on price upswings. Examples are provided to show how these generalizations of Nind's (1981) formula change the complexion of oilfield development optimization. (author)

  17. Multi-objective parallel particle swarm optimization for day-ahead Vehicle-to-Grid scheduling

    DEFF Research Database (Denmark)

    Soares, Joao; Vale, Zita; Canizes, Bruno

    2013-01-01

    This paper presents a methodology for multi-objective day-ahead energy resource scheduling for smart grids considering intensive use of distributed generation and Vehicle-To-Grid (V2G). The main focus is the application of weighted Pareto to a multi-objective parallel particle swarm approach aiming...... to solve the dual-objective V2G scheduling: minimizing total operation costs and maximizing V2G income. A realistic mathematical formulation, considering the network constraints and V2G charging and discharging efficiencies is presented and parallel computing is applied to the Pareto weights. AC power flow...

  18. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  19. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  20. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  1. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  2. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  3. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  4. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  5. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  6. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  7. Spiral CT and radiation dose

    International Nuclear Information System (INIS)

    Imhof, H.; Schibany, N.; Ba-Ssalamah, A.; Czerny, C.; Hojreh, A.; Kainberger, F.; Krestan, C.; Kudler, H.; Noebauer, I.; Nowotny, R.

    2003-01-01

    Recent studies in the USA and Europe state that computed tomography (CT) scans compromise only 3-5% of all radiological exams, but they contribute 35-45% of total radiation dose to the patient population. These studies lead to concern by several public authorities. Basis of CT-dose measurements is the computed tomography dose index (CTDI), which was established 1981. Nowadays there are several modifications of the CTDI values, which may lead to confusion. It is suggested to use the standardized CTDI-100 w. value together with the dose length product in all CT-examinations. These values should be printed on all CT-images and allows an evaluation of the individualized patient dose. Nowadays, radiologist's aim must be to work at the lowest maximal diagnostic acceptable signal to noise ratio. To decrease radiation dose radiologist should use low kV and mA, but high pitches. Newly developed CT-dose-reduction soft-wares and filters should be installed in all CT-machines. We should critically compare the average dose used for a specific examination with the reference dose used in this country and/or Europe. Greater differences should caution the radiologist. Finally, we as radiologists must check very carefully all indications and recommend alternative imaging methods. But we have also to teach our customers--patients and medical doctors who are non-radiologists--that a 'good' image is not that which show all possible information, but that which visualize 'only' the diagnostic necessary information

  8. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  9. Maximizing value for planned maintenance and turnarounds

    Energy Technology Data Exchange (ETDEWEB)

    Crager, John [Asset Performance Canada, ULC (Canada)

    2011-07-01

    In this presentation, Asset Performance Canada elaborates on turnaround management, and provides insight into managing strategies and risks associated with turnaround processes. Value is created fast as turnarounds progress from the strategy and scope definition phases towards the planning and execution phases. Turnarounds employ best practice solutions through common processes proven effective by data, research, and experience, ensuring consistent value creation, performance tracking, and shared lesson-learning. Adherence to the turnaround work process by carefully selected planning team members with clearly defined responsibilities and expectations, as well as an effective process for scope collection and management, are crucial to turnaround success. Further to this, a formal risk management process, employing automated risk tracking software and a safety management plan for assessing risks and their severity is also invaluable in avoiding any additional costs and schedule delays. Finally, assessment of team readiness and alignment through use of the turnaround readiness index, and rapid management of discovery work, can aid in contingency management.

  10. Hypergraph+: An Improved Hypergraph-Based Task-Scheduling Algorithm for Massive Spatial Data Processing on Master-Slave Platforms

    Directory of Open Access Journals (Sweden)

    Bo Cheng

    2016-08-01

    Full Text Available Spatial data processing often requires massive datasets, and the task/data scheduling efficiency of these applications has an impact on the overall processing performance. Among the existing scheduling strategies, hypergraph-based algorithms capture the data sharing pattern in a global way and significantly reduce total communication volume. Due to heterogeneous processing platforms, however, single hypergraph partitioning for later scheduling may be not optimal. Moreover, these scheduling algorithms neglect the overlap between task execution and data transfer that could further decrease execution time. In order to address these problems, an extended hypergraph-based task-scheduling algorithm, named Hypergraph+, is proposed for massive spatial data processing. Hypergraph+ improves upon current hypergraph scheduling algorithms in two ways: (1 It takes platform heterogeneity into consideration offering a metric function to evaluate the partitioning quality in order to derive the best task/file schedule; and (2 It can maximize the overlap between communication and computation. The GridSim toolkit was used to evaluate Hypergraph+ in an IDW spatial interpolation application on heterogeneous master-slave platforms. Experiments illustrate that the proposed Hypergraph+ algorithm achieves on average a 43% smaller makespan than the original hypergraph scheduling algorithm but still preserves high scheduling efficiency.

  11. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  12. Shareholder, stakeholder-owner or broad stakeholder maximization

    DEFF Research Database (Denmark)

    Mygind, Niels

    2004-01-01

    With reference to the discussion about shareholder versus stakeholder maximization it is argued that the normal type of maximization is in fact stakeholder-owner maxi-mization. This means maximization of the sum of the value of the shares and stake-holder benefits belonging to the dominating...... including the shareholders of a company. Although it may be the ultimate goal for Corporate Social Responsibility to achieve this kind of maximization, broad stakeholder maximization is quite difficult to give a precise definition. There is no one-dimensional measure to add different stakeholder benefits...... not traded on the mar-ket, and therefore there is no possibility for practical application. Broad stakeholder maximization instead in practical applications becomes satisfying certain stakeholder demands, so that the practical application will be stakeholder-owner maximization un-der constraints defined...

  13. Test-retest reliability of maximal leg muscle power and functional performance measures in patients with severe osteoarthritis (OA)

    DEFF Research Database (Denmark)

    Villadsen, Allan; Roos, Ewa M.; Overgaard, Søren

    Abstract : Purpose To evaluate the reliability of single-joint and multi-joint maximal leg muscle power and functional performance measures in patients with severe OA. Background Muscle power, taking both strength and velocity into account, is a more functional measure of lower extremity muscle...... and scheduled for unilateral total hip (n=9) or knee (n=11) replacement. Patients underwent a test battery on two occasions separated by approximately one week (range 7 to 11 days). Muscle power was measured using: 1. A linear encoder, unilateral lower limb isolated single-joint dynamic movement, e.g. knee...... flexion 2. A leg extension press, unilateral multi-joint knee and hip extension Functional performance was measured using: 1. 20 m walk usual pace 2. 20 m walk maximal pace 3. 5 times chair stands 4. Maximal number of knee bends/30sec Pain was measured on a VAS prior to and after conducting the entire...

  14. Optimizing Unmanned Aircraft System Scheduling

    Science.gov (United States)

    2008-06-01

    ASC-U uses a deterministic algorithm to optimize over a given finite time horizon to obtain near-optimal UAS mission area assignments. ASC-U...the details of the algorithm . We set an upper bound on the total number of schedules that can be generated, so as not to create unsolvable ILPs. We...COL_MISSION_NAME)) If Trim( CStr (rMissions(iRow, COL_MISSION_REQUIRED))) <> "" Then If CLng(rMissions(iRow, COL_MISSION_REQUIRED)) > CLng

  15. Maximizing Lumen Gain With Directional Atherectomy.

    Science.gov (United States)

    Stanley, Gregory A; Winscott, John G

    2016-08-01

    To describe the use of a low-pressure balloon inflation (LPBI) technique to delineate intraluminal plaque and guide directional atherectomy in order to maximize lumen gain and achieve procedure success. The technique is illustrated in a 77-year-old man with claudication who underwent superficial femoral artery revascularization using a HawkOne directional atherectomy catheter. A standard angioplasty balloon was inflated to 1 to 2 atm during live fluoroscopy to create a 3-dimensional "lumenogram" of the target lesion. Directional atherectomy was performed only where plaque impinged on the balloon at a specific fluoroscopic orientation. The results of the LPBI technique were corroborated with multimodality diagnostic imaging, including digital subtraction angiography, intravascular ultrasound, and intra-arterial pressure measurements. With the LPBI technique, directional atherectomy can routinely achieve <10% residual stenosis, as illustrated in this case, thereby broadly supporting a no-stent approach to lower extremity endovascular revascularization. © The Author(s) 2016.

  16. Primordial two-component maximally symmetric inflation

    Science.gov (United States)

    Enqvist, K.; Nanopoulos, D. V.; Quirós, M.; Kounnas, C.

    1985-12-01

    We propose a two-component inflation model, based on maximally symmetric supergravity, where the scales of reheating and the inflation potential at the origin are decoupled. This is possible because of the second-order phase transition from SU(5) to SU(3)×SU(2)×U(1) that takes place when φ≅φcinflation at the global minimum, and leads to a reheating temperature TR≅(1015-1016) GeV. This makes it possible to generate baryon asymmetry in the conventional way without any conflict with experimental data on proton lifetime. The mass of the gravitinos is m3/2≅1012 GeV, thus avoiding the gravitino problem. Monopoles are diluted by residual inflation in the broken phase below the cosmological bounds if φcUSA.

  17. Quench dynamics of topological maximally entangled states.

    Science.gov (United States)

    Chung, Ming-Chiang; Jhu, Yi-Hao; Chen, Pochung; Mou, Chung-Yu

    2013-07-17

    We investigate the quench dynamics of the one-particle entanglement spectra (OPES) for systems with topologically nontrivial phases. By using dimerized chains as an example, it is demonstrated that the evolution of OPES for the quenched bipartite systems is governed by an effective Hamiltonian which is characterized by a pseudospin in a time-dependent pseudomagnetic field S(k,t). The existence and evolution of the topological maximally entangled states (tMESs) are determined by the winding number of S(k,t) in the k-space. In particular, the tMESs survive only if nontrivial Berry phases are induced by the winding of S(k,t). In the infinite-time limit the equilibrium OPES can be determined by an effective time-independent pseudomagnetic field Seff(k). Furthermore, when tMESs are unstable, they are destroyed by quasiparticles within a characteristic timescale in proportion to the system size.

  18. Maximizing policy learning in international committees

    DEFF Research Database (Denmark)

    Nedergaard, Peter

    2007-01-01

    , this article demonstrates that valuable lessons can be learned about policy learning, in practice and theoretically, by analysing the cooperation in the OMC committees. Using the Advocacy Coalition Framework as the starting point of analysis, 15 hypotheses on policy learning are tested. Among other things......In the voluminous literature on the European Union's open method of coordination (OMC), no one has hitherto analysed on the basis of scholarly examination the question of what contributes to the learning processes in the OMC committees. On the basis of a questionnaire sent to all participants......, it is concluded that in order to maximize policy learning in international committees, empirical data should be made available to committees and provided by sources close to the participants (i.e. the Commission). In addition, the work in the committees should be made prestigious in order to attract well...

  19. Lovelock black holes with maximally symmetric horizons

    Energy Technology Data Exchange (ETDEWEB)

    Maeda, Hideki; Willison, Steven; Ray, Sourya, E-mail: hideki@cecs.cl, E-mail: willison@cecs.cl, E-mail: ray@cecs.cl [Centro de Estudios CientIficos (CECs), Casilla 1469, Valdivia (Chile)

    2011-08-21

    We investigate some properties of n( {>=} 4)-dimensional spacetimes having symmetries corresponding to the isometries of an (n - 2)-dimensional maximally symmetric space in Lovelock gravity under the null or dominant energy condition. The well-posedness of the generalized Misner-Sharp quasi-local mass proposed in the past study is shown. Using this quasi-local mass, we clarify the basic properties of the dynamical black holes defined by a future outer trapping horizon under certain assumptions on the Lovelock coupling constants. The C{sup 2} vacuum solutions are classified into four types: (i) Schwarzschild-Tangherlini-type solution; (ii) Nariai-type solution; (iii) special degenerate vacuum solution; and (iv) exceptional vacuum solution. The conditions for the realization of the last two solutions are clarified. The Schwarzschild-Tangherlini-type solution is studied in detail. We prove the first law of black-hole thermodynamics and present the expressions for the heat capacity and the free energy.

  20. MAXIMIZING THE BENEFITS OF ERP SYSTEMS

    Directory of Open Access Journals (Sweden)

    Paulo André da Conceição Menezes

    2010-04-01

    Full Text Available The ERP (Enterprise Resource Planning systems have been consolidated in companies with different sizes and sectors, allowing their real benefits to be definitively evaluated. In this study, several interactions have been studied in different phases, such as the strategic priorities and strategic planning defined as ERP Strategy; business processes review and the ERP selection in the pre-implementation phase, the project management and ERP adaptation in the implementation phase, as well as the ERP revision and integration efforts in the post-implementation phase. Through rigorous use of case study methodology, this research led to developing and to testing a framework for maximizing the benefits of the ERP systems, and seeks to contribute for the generation of ERP initiatives to optimize their performance.

  1. Maximal energy extraction under discrete diffusive exchange

    Energy Technology Data Exchange (ETDEWEB)

    Hay, M. J., E-mail: hay@princeton.edu [Department of Astrophysical Sciences, Princeton University, Princeton, New Jersey 08544 (United States); Schiff, J. [Department of Mathematics, Bar-Ilan University, Ramat Gan 52900 (Israel); Fisch, N. J. [Department of Astrophysical Sciences, Princeton University, Princeton, New Jersey 08544 (United States); Princeton Plasma Physics Laboratory, Princeton, New Jersey 08543 (United States)

    2015-10-15

    Waves propagating through a bounded plasma can rearrange the densities of states in the six-dimensional velocity-configuration phase space. Depending on the rearrangement, the wave energy can either increase or decrease, with the difference taken up by the total plasma energy. In the case where the rearrangement is diffusive, only certain plasma states can be reached. It turns out that the set of reachable states through such diffusive rearrangements has been described in very different contexts. Building upon those descriptions, and making use of the fact that the plasma energy is a linear functional of the state densities, the maximal extractable energy under diffusive rearrangement can then be addressed through linear programming.

  2. Maximizing profitability in a hospital outpatient pharmacy.

    Science.gov (United States)

    Jorgenson, J A; Kilarski, J W; Malatestinic, W N; Rudy, T A

    1989-07-01

    This paper describes the strategies employed to increase the profitability of an existing ambulatory pharmacy operated by the hospital. Methods to generate new revenue including implementation of a home parenteral therapy program, a home enteral therapy program, a durable medical equipment service, and home care disposable sales are described. Programs to maximize existing revenue sources such as increasing the capture rate on discharge prescriptions, increasing "walk-in" prescription traffic and increasing HMO prescription volumes are discussed. A method utilized to reduce drug expenditures is also presented. By minimizing expenses and increasing the revenues for the ambulatory pharmacy operation, net profit increased from +26,000 to over +140,000 in one year.

  3. Maximizing the benefits of a dewatering system

    International Nuclear Information System (INIS)

    Matthews, P.; Iverson, T.S.

    1999-01-01

    The use of dewatering systems in the mining, industrial sludge and sewage waste treatment industries is discussed, also describing some of the problems that have been encountered while using drilling fluid dewatering technology. The technology is an acceptable drilling waste handling alternative but it has had problems associated with recycled fluid incompatibility, high chemical costs and system inefficiencies. This paper discussed the following five action areas that can maximize the benefits and help reduce costs of a dewatering project: (1) co-ordinate all services, (2) choose equipment that fits the drilling program, (3) match the chemical treatment with the drilling fluid types, (4) determine recycled fluid compatibility requirements, and (5) determine the disposal requirements before project start-up. 2 refs., 5 figs

  4. Mixtures of maximally entangled pure states

    Energy Technology Data Exchange (ETDEWEB)

    Flores, M.M., E-mail: mflores@nip.up.edu.ph; Galapon, E.A., E-mail: eric.galapon@gmail.com

    2016-09-15

    We study the conditions when mixtures of maximally entangled pure states remain entangled. We found that the resulting mixed state remains entangled when the number of entangled pure states to be mixed is less than or equal to the dimension of the pure states. For the latter case of mixing a number of pure states equal to their dimension, we found that the mixed state is entangled provided that the entangled pure states to be mixed are not equally weighted. We also found that one can restrict the set of pure states that one can mix from in order to ensure that the resulting mixed state is genuinely entangled. Also, we demonstrate how these results could be applied as a way to detect entanglement in mixtures of the entangled pure states with noise.

  5. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  6. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  7. Maximally reliable Markov chains under energy constraints.

    Science.gov (United States)

    Escola, Sean; Eisele, Michael; Miller, Kenneth; Paninski, Liam

    2009-07-01

    Signal-to-noise ratios in physical systems can be significantly degraded if the outputs of the systems are highly variable. Biological processes for which highly stereotyped signal generations are necessary features appear to have reduced their signal variabilities by employing multiple processing steps. To better understand why this multistep cascade structure might be desirable, we prove that the reliability of a signal generated by a multistate system with no memory (i.e., a Markov chain) is maximal if and only if the system topology is such that the process steps irreversibly through each state, with transition rates chosen such that an equal fraction of the total signal is generated in each state. Furthermore, our result indicates that by increasing the number of states, it is possible to arbitrarily increase the reliability of the system. In a physical system, however, an energy cost is associated with maintaining irreversible transitions, and this cost increases with the number of such transitions (i.e., the number of states). Thus, an infinite-length chain, which would be perfectly reliable, is infeasible. To model the effects of energy demands on the maximally reliable solution, we numerically optimize the topology under two distinct energy functions that penalize either irreversible transitions or incommunicability between states, respectively. In both cases, the solutions are essentially irreversible linear chains, but with upper bounds on the number of states set by the amount of available energy. We therefore conclude that a physical system for which signal reliability is important should employ a linear architecture, with the number of states (and thus the reliability) determined by the intrinsic energy constraints of the system.

  8. Dose limits

    International Nuclear Information System (INIS)

    Fitoussi, L.

    1987-12-01

    The dose limit is defined to be the level of harmfulness which must not be exceeded, so that an activity can be exercised in a regular manner without running a risk unacceptable to man and the society. The paper examines the effects of radiation categorised into stochastic and non-stochastic. Dose limits for workers and the public are discussed

  9. A Criterion to Identify Maximally Entangled Four-Qubit State

    International Nuclear Information System (INIS)

    Zha Xinwei; Song Haiyang; Feng Feng

    2011-01-01

    Paolo Facchi, et al. [Phys. Rev. A 77 (2008) 060304(R)] presented a maximally multipartite entangled state (MMES). Here, we give a criterion for the identification of maximally entangled four-qubit states. Using this criterion, we not only identify some existing maximally entangled four-qubit states in the literature, but also find several new maximally entangled four-qubit states as well. (general)

  10. Maximal lattice free bodies, test sets and the Frobenius problem

    DEFF Research Database (Denmark)

    Jensen, Anders Nedergaard; Lauritzen, Niels; Roune, Bjarke Hammersholt

    Maximal lattice free bodies are maximal polytopes without interior integral points. Scarf initiated the study of maximal lattice free bodies relative to the facet normals in a fixed matrix. In this paper we give an efficient algorithm for computing the maximal lattice free bodies of an integral m...... method is inspired by the novel algorithm by Einstein, Lichtblau, Strzebonski and Wagon and the Groebner basis approach by Roune....

  11. Scheduling algorithms for rapid imaging using agile Cubesat constellations

    Science.gov (United States)

    Nag, Sreeja; Li, Alan S.; Merrick, James H.

    2018-02-01

    Distributed Space Missions such as formation flight and constellations, are being recognized as important Earth Observation solutions to increase measurement samples over space and time. Cubesats are increasing in size (27U, ∼40 kg in development) with increasing capabilities to host imager payloads. Given the precise attitude control systems emerging in the commercial market, Cubesats now have the ability to slew and capture images within short notice. We propose a modular framework that combines orbital mechanics, attitude control and scheduling optimization to plan the time-varying, full-body orientation of agile Cubesats in a constellation such that they maximize the number of observed images and observation time, within the constraints of Cubesat hardware specifications. The attitude control strategy combines bang-bang and PD control, with constraints such as power consumption, response time, and stability factored into the optimality computations and a possible extension to PID control to account for disturbances. Schedule optimization is performed using dynamic programming with two levels of heuristics, verified and improved upon using mixed integer linear programming. The automated scheduler is expected to run on ground station resources and the resultant schedules uplinked to the satellites for execution, however it can be adapted for onboard scheduling, contingent on Cubesat hardware and software upgrades. The framework is generalizable over small steerable spacecraft, sensor specifications, imaging objectives and regions of interest, and is demonstrated using multiple 20 kg satellites in Low Earth Orbit for two case studies - rapid imaging of Landsat's land and coastal images and extended imaging of global, warm water coral reefs. The proposed algorithm captures up to 161% more Landsat images than nadir-pointing sensors with the same field of view, on a 2-satellite constellation over a 12-h simulation. Integer programming was able to verify that

  12. Synthesis of Flexible Fault-Tolerant Schedules with Preemption for Mixed Soft and Hard Real-Time Systems

    DEFF Research Database (Denmark)

    Izosimov, Viacheslav; Pop, Paul; Eles, Petru

    2008-01-01

    In this paper we present an approach for scheduling with preemption for fault-tolerant embedded systems composed of soft and hard real-time processes. We are interested to maximize the overall utility for average, most likely to happen, scenarios and to guarantee the deadlines for the hard...

  13. Optimization of Second Fault Detection Thresholds to Maximize Mission POS

    Science.gov (United States)

    Anzalone, Evan

    2018-01-01

    both magnitude and time. As such, the Navigation team is taking advantage of the INS's capability to schedule and change fault detection thresholds in flight. These values are optimized along a nominal trajectory in order to maximize probability of mission success, and reducing the probability of false positives (defined as when the INS would report a second fault condition resulting in loss of mission, but the vehicle would still meet insertion requirements within system-level margins). This paper will describe an optimization approach using Genetic Algorithms to tune the threshold parameters to maximize vehicle resilience to second fault events as a function of potential fault magnitude and time of fault over an ascent mission profile. The analysis approach, and performance assessment of the results will be presented to demonstrate the applicability of this process to second fault detection to maximize mission probability of success.

  14. Influences on cocaine tolerance assessed under a multiple conjunctive schedule of reinforcement.

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N

    2009-11-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the effects of cocaine on key-pecking responses of White Carneau pigeons maintained under a three-component multiple conjunctive FI (10 s, 30 s, & 120 s) FR (5 responses) schedule of food presentation. Dose-effect curves representing the effects of presession cocaine on responding were assessed in the context of (1) acute administration of cocaine (2) chronic administration of cocaine and (3) daily administration of saline. Chronic administration of cocaine generally resulted in tolerance to the response-rate decreasing effects of cocaine, and that tolerance was generally independent of relative FI value, as measured by changes in ED50 values. Daily administration of saline decreased ED50 values to those observed when cocaine was administered acutely. The results show that adding a FR requirement to FI schedules is not sufficient to produce schedule-parameter-specific tolerance. Tolerance to cocaine was generally independent of FI-parameter under the present conjunctive schedules, indicating that a ratio requirement, per se, is not sufficient for tolerance to be dependent on FI parameter.

  15. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  16. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  17. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  18. A schedule to demonstrate radiation-induced sister chromatid exchanges in human lymphocytes

    International Nuclear Information System (INIS)

    Chaudhuri, J.P.

    1982-01-01

    The reciprocal interchange between the chromatids of a chromosome, termed sister chromatid exchange (SCE), is considered to be one of the most sensitive and accurate cytogenetic parameters and respond to toxic chemicals at very low doses. But the response of SCE to ionizing radiation is very poor. Human lymphocytes fail to give SCE response when irradiated at G 0 . Probably the primary lesions induced at G 0 do not remain available long enough to find expression as SCEs. Based on this assumption a schedule was developed using caffeine to demonstrate radiation induced SCEs. Following this schedule a dose-dependent increase in the frequency of radiation induced SCEs has been observed. (orig.)

  19. Price and Service Discrimination in Queuing Systems: Incentive Compatibility of Gc\\mu Scheduling

    OpenAIRE

    Jan A. Van Mieghem

    2000-01-01

    This article studies the optimal prices and service quality grades that a queuing system---the "firm"---provides to heterogeneous, utility-maximizing customers who measure quality by their experienced delay distributions. Results are threefold: First, delay cost curves are introduced that allow for a flexible description of a customer's quality sensitivity. Second, a comprehensive executable approach is proposed that analytically specifies scheduling, delay distributions and prices for arbitr...

  20. Effect of vaccination schedule on immune response of Macaca mulatta to cell culture-grown Rocky Mountain spotted fever vaccine.

    Science.gov (United States)

    Sammons, L S; Kenyon, R H; Pedersen, C E

    1976-01-01

    The effect of vaccination schedule on the immune response of Macaca mulatta to formalin-inactivated chicken embryo cell culture (CEC)-grown Rickettsia rickettsii vaccine was studied. Schedules consisted of inoculation on day 1 only, on days 1 and 15, on days 1 and 30, on days 1, 8, and 15, or on days 1, 15, and 45. Humoral antibody measured by microagglutination and indirect immunofluorescence and resistance to challenge with 10(4) plaque-forming units of yolk sac-grown R. rickettsii were assessed. Seroconversion was noted in all monkeys after the first dose of vaccine. A second dose administered 8 or 15 days after the primary infection, or a third given 7 or 30 days after the second, produced no long-term effect on antibody titer. Only monkeys given two doses of vaccine at a 30-day interval showed an increase in antibody titer during the period before challenge. Vaccination with one, two, or three doses of CEC vaccine prevented development of rash and rickettsemia after challenge. The two-dose schedules appeared to induce the highest degree of resistance to challenge, as indicated by unaltered hematological parameters and body temperature in monkeys. The one- and three-dose schedules were somewhat less effective, in that some challenged monkeys within each group displayed febrile and leukocyte responses associated with Rocky Mountain spotted fever infection. Our data suggest that administration of two doses of CEC vaccine at 15- or 30-day intervals is the immunization schedule of choice. PMID:823173

  1. Automated medical resident rotation and shift scheduling to ensure quality resident education and patient care.

    Science.gov (United States)

    Smalley, Hannah K; Keskinocak, Pinar

    2016-03-01

    At academic teaching hospitals around the country, the majority of clinical care is provided by resident physicians. During their training, medical residents often rotate through various hospitals and/or medical services to maximize their education. Depending on the size of the training program, manually constructing such a rotation schedule can be cumbersome and time consuming. Further, rules governing allowable duty hours for residents have grown more restrictive in recent years (ACGME 2011), making day-to-day shift scheduling of residents more difficult (Connors et al., J Thorac Cardiovasc Surg 137:710-713, 2009; McCoy et al., May Clin Proc 86(3):192, 2011; Willis et al., J Surg Edu 66(4):216-221, 2009). These rules limit lengths of duty periods, allowable duty hours in a week, and rest periods, to name a few. In this paper, we present two integer programming models (IPs) with the goals of (1) creating feasible assignments of residents to rotations over a one-year period, and (2) constructing night and weekend call-shift schedules for the individual rotations. These models capture various duty-hour rules and constraints, provide the ability to test multiple what-if scenarios, and largely automate the process of schedule generation, solving these scheduling problems more effectively and efficiently compared to manual methods. Applying our models on data from a surgical residency program, we highlight the infeasibilities created by increased duty-hour restrictions placed on residents in conjunction with current scheduling paradigms.

  2. Multi-Satellite Observation Scheduling for Large Area Disaster Emergency Response

    Science.gov (United States)

    Niu, X. N.; Tang, H.; Wu, L. X.

    2018-04-01

    an optimal imaging plan, plays a key role in coordinating multiple satellites to monitor the disaster area. In the paper, to generate imaging plan dynamically according to the disaster relief, we propose a dynamic satellite task scheduling method for large area disaster response. First, an initial robust scheduling scheme is generated by a robust satellite scheduling model in which both the profit and the robustness of the schedule are simultaneously maximized. Then, we use a multi-objective optimization model to obtain a series of decomposing schemes. Based on the initial imaging plan, we propose a mixed optimizing algorithm named HA_NSGA-II to allocate the decomposing results thus to obtain an adjusted imaging schedule. A real disaster scenario, i.e., 2008 Wenchuan earthquake, is revisited in terms of rapid response using satellite resources and used to evaluate the performance of the proposed method with state-of-the-art approaches. We conclude that our satellite scheduling model can optimize the usage of satellite resources so as to obtain images in disaster response in a more timely and efficient manner.

  3. Dynamic Sleep Scheduling on Air Pollution Levels Monitoring with Wireless Sensor Network

    Directory of Open Access Journals (Sweden)

    Gezaq Abror

    2018-01-01

    Full Text Available Wireless Sensor Network (WSN can be applied for Air Pollution Level Monitoring System that have been determined by the Environmental Impact Management Agency which is  PM10, SO2, O3, NO2 and CO. In WSN, node system is constrained to a limited power supply, so that the node system has a lifetime. To doing lifetime maximization, power management scheme is required and sensor nodes should use energy efficiently. This paper proposes dynamic sleep scheduling using Time Category-Fuzzy Logic (Time-Fuzzy Scheduling as a reference for calculating time interval for sleep and activated node system to support power management scheme. This research contributed in power management design to be applied to the WSN system to reduce energy expenditure. From the test result in real hardware node system, it can be seen that Time-Fuzzy Scheduling is better in terms of using the battery and it is better in terms of energy consumption too because it is more efficient 51.85% when it is compared with Fuzzy Scheduling, it is more efficient 68.81% when it is compared with Standard Scheduling and it is more efficient 85.03% when compared with No Scheduling.

  4. Elastic Scheduling of Scientific Workflows under Deadline Constraints in Cloud Computing Environments

    Directory of Open Access Journals (Sweden)

    Nazia Anwar

    2018-01-01

    Full Text Available Scientific workflow applications are collections of several structured activities and fine-grained computational tasks. Scientific workflow scheduling in cloud computing is a challenging research topic due to its distinctive features. In cloud environments, it has become critical to perform efficient task scheduling resulting in reduced scheduling overhead, minimized cost and maximized resource utilization while still meeting the user-specified overall deadline. This paper proposes a strategy, Dynamic Scheduling of Bag of Tasks based workflows (DSB, for scheduling scientific workflows with the aim to minimize financial cost of leasing Virtual Machines (VMs under a user-defined deadline constraint. The proposed model groups the workflow into Bag of Tasks (BoTs based on data dependency and priority constraints and thereafter optimizes the allocation and scheduling of BoTs on elastic, heterogeneous and dynamically provisioned cloud resources called VMs in order to attain the proposed method’s objectives. The proposed approach considers pay-as-you-go Infrastructure as a Service (IaaS clouds having inherent features such as elasticity, abundance, heterogeneity and VM provisioning delays. A trace-based simulation using benchmark scientific workflows representing real world applications, demonstrates a significant reduction in workflow computation cost while the workflow deadline is met. The results validate that the proposed model produces better success rates to meet deadlines and cost efficiencies in comparison to adapted state-of-the-art algorithms for similar problems.

  5. On maximal surfaces in asymptotically flat space-times

    International Nuclear Information System (INIS)

    Bartnik, R.; Chrusciel, P.T.; O Murchadha, N.

    1990-01-01

    Existence of maximal and 'almost maximal' hypersurfaces in asymptotically flat space-times is established under boundary conditions weaker than those considered previously. We show in particular that every vacuum evolution of asymptotically flat data for Einstein equations can be foliated by slices maximal outside a spatially compact set and that every (strictly) stationary asymptotically flat space-time can be foliated by maximal hypersurfaces. Amongst other uniqueness results, we show that maximal hypersurface can be used to 'partially fix' an asymptotic Poincare group. (orig.)

  6. Controllable dose

    International Nuclear Information System (INIS)

    Alvarez R, J.T.; Anaya M, R.A.

    2004-01-01

    With the purpose of eliminating the controversy about the lineal hypothesis without threshold which found the systems of dose limitation of the recommendations of ICRP 26 and 60, at the end of last decade R. Clarke president of the ICRP proposed the concept of Controllable Dose: as the dose or dose sum that an individual receives from a particular source which can be reasonably controllable by means of any means; said concept proposes a change in the philosophy of the radiological protection of its concern by social approaches to an individual focus. In this work a panorama of the foundations is presented, convenient and inconveniences that this proposal has loosened in the international community of the radiological protection, with the purpose of to familiarize to our Mexican community in radiological protection with these new concepts. (Author)

  7. An Arrival and Departure Time Predictor for Scheduling Communication in Opportunistic IoT

    Science.gov (United States)

    Pozza, Riccardo; Georgoulas, Stylianos; Moessner, Klaus; Nati, Michele; Gluhak, Alexander; Krco, Srdjan

    2016-01-01

    In this article, an Arrival and Departure Time Predictor (ADTP) for scheduling communication in opportunistic Internet of Things (IoT) is presented. The proposed algorithm learns about temporal patterns of encounters between IoT devices and predicts future arrival and departure times, therefore future contact durations. By relying on such predictions, a neighbour discovery scheduler is proposed, capable of jointly optimizing discovery latency and power consumption in order to maximize communication time when contacts are expected with high probability and, at the same time, saving power when contacts are expected with low probability. A comprehensive performance evaluation with different sets of synthetic and real world traces shows that ADTP performs favourably with respect to previous state of the art. This prediction framework opens opportunities for transmission planners and schedulers optimizing not only neighbour discovery, but the entire communication process. PMID:27827909

  8. An Arrival and Departure Time Predictor for Scheduling Communication in Opportunistic IoT.

    Science.gov (United States)

    Pozza, Riccardo; Georgoulas, Stylianos; Moessner, Klaus; Nati, Michele; Gluhak, Alexander; Krco, Srdjan

    2016-11-04

    In this article, an Arrival and Departure Time Predictor (ADTP) for scheduling communication in opportunistic Internet of Things (IoT) is presented. The proposed algorithm learns about temporal patterns of encounters between IoT devices and predicts future arrival and departure times, therefore future contact durations. By relying on such predictions, a neighbour discovery scheduler is proposed, capable of jointly optimizing discovery latency and power consumption in order to maximize communication time when contacts are expected with high probability and, at the same time, saving power when contacts are expected with low probability. A comprehensive performance evaluation with different sets of synthetic and real world traces shows that ADTP performs favourably with respect to previous state of the art. This prediction framework opens opportunities for transmission planners and schedulers optimizing not only neighbour discovery, but the entire communication process.

  9. An Efficient Live TV Scheduling System for 4G LTE Broadcast

    KAUST Repository

    Lau, Chun Pong

    2016-01-01

    Traditional live television (TV) broadcasting systems are proven to be spectrum inefficient. Therefore, researchers propose to provide TV services on fourth-generation (4G) long-term evolution (LTE) networks. However, static broadcast, a typical broadcasting method over cellular network, is inefficient in terms of radio resource usage. To solve this problem, the audience-driven live TV scheduling (ADTVS) framework is proposed, to maximize radio resource usage when providing TV broadcasting services over LTE networks. ADTVS, a system-level scheduling framework, considers both available radio resources and audience preferences, in order to dynamically schedule TV channels for broadcasting at various time and locations. By conducting a simulation using real-life data and scenarios, it is shown that ADTVS significantly outperforms the static broadcast method. Numerical results indicate that, on average, ADTVS enables substantial improvement to broadcast efficiency and conserves considerable amount of radio resources, while forgoing less than 5% of user services compared to the benchmark system.

  10. Optimal methodology for a machining process scheduling in spot electricity markets

    International Nuclear Information System (INIS)

    Yusta, J.M.; Torres, F.; Khodr, H.M.

    2010-01-01

    Electricity spot markets have introduced hourly variations in the price of electricity. These variations allow the increase of the energy efficiency by the appropriate scheduling and adaptation of the industrial production to the hourly cost of electricity in order to obtain the maximum profit for the industry. In this article a mathematical optimization model simulates costs and the electricity demand of a machining process. The resultant problem is solved using the generalized reduced gradient approach, to find the optimum production schedule that maximizes the industry profit considering the hourly variations of the price of electricity in the spot market. Different price scenarios are studied to analyze the impact of the spot market prices for electricity on the optimal scheduling of the machining process and on the industry profit. The convenience of the application of the proposed model is shown especially in cases of very high electricity prices.

  11. DAILY SCHEDULING OF SMALL HYDRO POWER PLANTS DISPATCH WITH MODIFIED PARTICLES SWARM OPTIMIZATION

    Directory of Open Access Journals (Sweden)

    Sinvaldo Rodrigues Moreno

    2015-04-01

    Full Text Available This paper presents a new approach for short-term hydro power scheduling of reservoirs using an algorithm-based Particle Swarm Optimization (PSO. PSO is a population-based algorithm designed to find good solutions to optimization problems, its characteristics have encouraged its adoption to tackle a variety of problems in different fields. In this paper the authors consider an optimization problem related to a daily scheduling of small hydro power dispatch. The goal is construct a feasible solution that maximize the cascade electricity production, following the environmental constraints and water balance. The paper proposes an improved Particle Swarm Optimization (PSO algorithm, which takes advantage of simplicity and facility of implementation. The algorithm was successfully applied to the optimization of the daily schedule strategies of small hydro power plants, considering maximum water utilization and all constraints related to simultaneous water uses. Extensive computational tests and comparisons with other heuristics methods showed the effectiveness of the proposed approach.

  12. Optimization of scheduling system for plant watering using electric cars in agro techno park

    Science.gov (United States)

    Oktavia Adiwijaya, Nelly; Herlambang, Yudha; Slamin

    2018-04-01

    Agro Techno Park in University of Jember is a special area used for the development of agriculture, livestock and fishery. In this plantation, the process of watering the plants is according to the frequency of each plant needs. This research develops the optimization of plant watering scheduling system using edge coloring of graph. This research was conducted in 3 stages, namely, data collection phase, analysis phase, and system development stage. The collected data was analyzed and then converted into a graph by using bipartite adjacency matrix representation. The development phase is conducted to build a web-based watering schedule optimization system. The result of this research showed that the schedule system is optimal because it can maximize the use of all electric cars to water the plants and minimize the number of idle cars.

  13. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  14. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  15. A Note of Caution on Maximizing Entropy

    Directory of Open Access Journals (Sweden)

    Richard E. Neapolitan

    2014-07-01

    Full Text Available The Principle of Maximum Entropy is often used to update probabilities due to evidence instead of performing Bayesian updating using Bayes’ Theorem, and its use often has efficacious results. However, in some circumstances the results seem unacceptable and unintuitive. This paper discusses some of these cases, and discusses how to identify some of the situations in which this principle should not be used. The paper starts by reviewing three approaches to probability, namely the classical approach, the limiting frequency approach, and the Bayesian approach. It then introduces maximum entropy and shows its relationship to the three approaches. Next, through examples, it shows that maximizing entropy sometimes can stand in direct opposition to Bayesian updating based on reasonable prior beliefs. The paper concludes that if we take the Bayesian approach that probability is about reasonable belief based on all available information, then we can resolve the conflict between the maximum entropy approach and the Bayesian approach that is demonstrated in the examples.

  16. Optimal topologies for maximizing network transmission capacity

    Science.gov (United States)

    Chen, Zhenhao; Wu, Jiajing; Rong, Zhihai; Tse, Chi K.

    2018-04-01

    It has been widely demonstrated that the structure of a network is a major factor that affects its traffic dynamics. In this work, we try to identify the optimal topologies for maximizing the network transmission capacity, as well as to build a clear relationship between structural features of a network and the transmission performance in terms of traffic delivery. We propose an approach for designing optimal network topologies against traffic congestion by link rewiring and apply them on the Barabási-Albert scale-free, static scale-free and Internet Autonomous System-level networks. Furthermore, we analyze the optimized networks using complex network parameters that characterize the structure of networks, and our simulation results suggest that an optimal network for traffic transmission is more likely to have a core-periphery structure. However, assortative mixing and the rich-club phenomenon may have negative impacts on network performance. Based on the observations of the optimized networks, we propose an efficient method to improve the transmission capacity of large-scale networks.

  17. New features of the maximal abelian projection

    International Nuclear Information System (INIS)

    Bornyakov, V.G.; Polikarpov, M.I.; Syritsyn, S.N.; Schierholz, G.; Suzuki, T.

    2005-12-01

    After fixing the Maximal Abelian gauge in SU(2) lattice gauge theory we decompose the nonabelian gauge field into the so called monopole field and the modified nonabelian field with monopoles removed. We then calculate respective static potentials and find that the potential due to the modified nonabelian field is nonconfining while, as is well known, the monopole field potential is linear. Furthermore, we show that the sum of these potentials approximates the nonabelian static potential with 5% or higher precision at all distances considered. We conclude that at large distances the monopole field potential describes the classical energy of the hadronic string while the modified nonabelian field potential describes the string fluctuations. Similar decomposition was observed to work for the adjoint static potential. A check was also made of the center projection in the direct center gauge. Two static potentials, determined by projected Z 2 and by modified nonabelian field without Z 2 component were calculated. It was found that their sum is a substantially worse approximation of the SU(2) static potential than that found in the monopole case. It is further demonstrated that similar decomposition can be made for the flux tube action/energy density. (orig.)

  18. Optimal scheduling of micro grids based on single objective programming

    Science.gov (United States)

    Chen, Yue

    2018-04-01

    Faced with the growing demand for electricity and the shortage of fossil fuels, how to optimally optimize the micro-grid has become an important research topic to maximize the economic, technological and environmental benefits of the micro-grid. This paper considers the role of the battery and the micro-grid and power grid to allow the exchange of power not exceeding 150kW preconditions, the main study of the economy to load for the goal is to minimize the electricity cost (abandonment of wind), to establish an optimization model, and to solve the problem by genetic algorithm. The optimal scheduling scheme is obtained and the utilization of renewable energy and the impact of the battery involved in regulation are analyzed.

  19. Method and apparatus for scheduling broadcasts in social networks

    KAUST Repository

    Manzoor, Emaad Ahmed

    2016-08-25

    A method, apparatus, and computer readable medium are provided for maximizing consumption of broadcasts by a producer. An example method includes receiving selection of a total number of time slots to use for scheduling broadcasts, and receiving information regarding the producer\\'s followers. The example method further 5 includes identifying, by a processor and based on the received information, discount factors associated with the producer\\'s followers, and calculating, by the processor and based on the received information, a predicted number of competitor broadcasts during each time slot of the total number of time slots. Finally, the example method includes determining, by the processor and based on the discount factors and the predicted 10 number of competitor broadcasts during each time slot, a number of broadcasts for the producer to transmit in each time slot of the total number of time slots.

  20. A probabilistic computational framework for bridge network optimal maintenance scheduling

    International Nuclear Information System (INIS)

    Bocchini, Paolo; Frangopol, Dan M.

    2011-01-01

    This paper presents a probabilistic computational framework for the Pareto optimization of the preventive maintenance applications to bridges of a highway transportation network. The bridge characteristics are represented by their uncertain reliability index profiles. The in/out of service states of the bridges are simulated taking into account their correlation structure. Multi-objective Genetic Algorithms have been chosen as numerical tool for the solution of the optimization problem. The design variables of the optimization are the preventive maintenance schedules of all the bridges of the network. The two conflicting objectives are the minimization of the total present maintenance cost and the maximization of the network performance indicator. The final result is the Pareto front of optimal solutions among which the managers should chose, depending on engineering and economical factors. A numerical example illustrates the application of the proposed approach.

  1. On the secondary users opportunistic scheduling with reduced feedback

    KAUST Repository

    Song, Yao

    2012-03-01

    In underlay cognitive radio systems, secondary users (SUs) can share the spectrum with primary users (PUs) as long as the interference caused by SUs to PUs is below a certain threshold. When multiple SUs want to access the channel, multiuser diversity scheme can be applied to maximize the utilization rate of the channel. In this paper, the performance of selective multi user diversity scheme in underlay cognitive radio system is analyzed. We first start with the case in which all SUs have the same average signal-to-noise ratio (SNR). We then treat the more realistic case involving SUs with different average SNRs. Both power control and no power control scenarios are considered for the SUs. Furthermore, we take scheduling fairness into considerations and study a normalized SNR selection scheme in the case that SUs have different average SNRs. © 2012 IEEE.

  2. Generator scheduling under competitive environment using Memory Management Algorithm

    Directory of Open Access Journals (Sweden)

    A. Amudha

    2013-09-01

    Full Text Available This paper presents a new approach for Real-Time Application of Profit Based Unit Commitment using Memory Management Algorithm. The main objective of the restructured system is to maximize its own profit without the responsibility of satisfying the forecasted demand. The Profit Based Unit Commitment (PBUC is solved by Memory Management Algorithm (MMA in Real-Time Application. MMA approach is introduced in this paper considering power and reserve generation. The proposed method MMA uses Best Fit and Worst Fit allocation for generator scheduling in order to receive the maximum profit by considering the softer demand. Also, this method gives an idea regarding how much power and reserve should be sold in markets. The proposed approach has been tested on a power system with 2, 3, and 10 generating units. Simulation results of the proposed approach have been compared with the existing methods.

  3. [Immunisation schedule of the Spanish Association of Paediatrics: 2018 recommendations].

    Science.gov (United States)

    Moreno-Pérez, David; Álvarez García, Francisco José; Álvarez Aldeán, Javier; Cilleruelo Ortega, María José; Garcés Sánchez, María; García Sánchez, Nuria; Hernández Merino, Ángel; Méndez Hernández, María; Merino Moína, Manuel; Montesdeoca Melián, Abián; Ruiz-Contreras, Jesús

    2018-01-01

    The Advisory Committee on Vaccines of the Spanish Association of Paediatrics annually publishes the immunisation schedule considered optimal for children resident in Spain, according to available evidence on current vaccines. Regarding funded immunisations, 2+1 strategy (2, 4, 11-12 months) with hexavalent (DTPa-IPV-Hib-HB) and 13-valent pneumococcal vaccines are recommended. Administration of the 6-year booster dose with DTPa is recommended, and a poliomyelitis dose for children who had received the 2+1 scheme, as well as Tdap vaccine for adolescents and pregnant women in every pregnancy between 27 and 32 weeks' gestation. The two-dose scheme should be used for MMR (12 months and 2-4 years) and varicella (15 months and 2-4 years). MMRV vaccine could be applied as the second dose if available. Coverage of human papillomavirus vaccination in girls aged 12 with a two dose scheme (0, 6 months) should be improved. Information and recommendation for male adolescents about potential beneficial effects of this immunisation should be provided as well. The new 9 genotypes vaccine is now available, expanding the coverage for both gender. Regarding non-funded immunisations, Committee on Vaccines of the Spanish Association of Paediatrics recommends meningococcal B vaccination, with a 3+1 schedule, and requests to be included in the National Immunisation Program. Tetravalent meningococcal vaccine (MenACWY) is recommended to adolescents (14-18 years) who are going to live in countries with systematic vaccination against ACWY serogroups, and people >6 weeks of age with risk factors or travellers to countries with very high incidence. Vaccination against rotavirus is recommended in all infants. Copyright © 2017 Asociación Española de Pediatría. Publicado por Elsevier España, S.L.U. All rights reserved.

  4. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event is availa......CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event...... is available. The CHI'13 Interactive Schedule helps attendees navigate this wealth of video content in order to identify events they would like to attend. It consists of a number of large display screens throughout the conference venue which cycle through a video playlist of events. Attendees can interact...

  5. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  6. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  7. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  8. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  9. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  10. Management of Temporal Constraints for Factory Scheduling.

    Science.gov (United States)

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  11. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  12. Trustable Virtual Machine Scheduling in a Cloud

    OpenAIRE

    Hermenier , Fabien; Henrio , Ludovic

    2017-01-01

    International audience; In an Infrastructure As A Service (IaaS) cloud, the scheduler deploys VMs to servers according to service level objectives (SLOs). Clients and service providers must both trust the infrastructure. In particular they must be sure that the VM scheduler takes decisions that are consistent with its advertised behaviour. The difficulties to master every theoretical and practical aspects of a VM scheduler implementation leads however to faulty behaviours that break SLOs and ...

  13. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  14. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  15. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  16. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  17. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  18. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  19. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  20. 15 CFR 700.14 - Preferential scheduling.

    Science.gov (United States)

    2010-01-01

    ...) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Industrial Priorities § 700.14 Preferential scheduling. (a) A...