  1. Clustering and scheduling maintenance tasks over time

    OpenAIRE

    Kreuger, Per

    2008-01-01

    We report results on a maintenance scheduling problem. The problem consists of allocating maintenance task instances to and scheduling the performances of a suitable number of maintenance packages. The number of maintenance packages is not fixed, nor is, in general, the dates or durations of their performances. A constraint programming (CP) model and solver for the problem is presented together with preliminary computational results.

  2. Strategic Gang Scheduling for Railroad Maintenance

    Science.gov (United States)

    2012-08-14

    We address the railway track maintenance scheduling problem. The problem stems from the : significant percentage of the annual budget invested by the railway industry for maintaining its railway : tracks. The process requires consideration of human r...

  3. DEVELOPMENT OF A MAINTENANCE SCHEDULING MODEL FOR ...

    African Journals Online (AJOL)

    This paper presents the development of an efficient method for use in obtaining the best time between coordinated overhauls for a group of machines. The method is capable of stating the overhaul frequency of each machine within this time period. For convenience in the formulation of the model, maintenance schedule ...

  4. AN INFLATION-BASED MAINTENANCE SCHEDULING MODEL

    Directory of Open Access Journals (Sweden)

    S.A. Oke

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: This paper attempts to extend an original Gantt-charting model for optimal maintenance scheduling of multiple facilities in multiple periods credited to Charles- Owaba. In particular, an inflationary factor is incorporated into the period-dependent cost function element of the model. Some computational experimentation on the new model is tested. This work is perhaps the first to advance the extension of the Optimal Gantt Charting (OGC model in terms of inflation. The work presents a wealth of research opportunities and has at least the modest potential to evaluate maintenance scheduling theory into the ranks of major theories of maintenance.

    AFRIKAANSE OPSOMMING: Die artikel poog om inflasie te akkommodeer binne die raamwerk van ‘n Ganttkaartmodel vir die bepaling van optimum skedulering van instandhouding vir meervoudige fasiliteite met die verloop van tyd. Inflasie vorm dus deel van die koste-element van die model. Die model is ook op ‘n beperkte wyse gevalideer met behulp van ‘n rekenaarstudie. Die verkreë resultate toon dat addisionele navorsing gedoen kan word om sodoende die metode te vestig in die voorste rang van instandhoudingsbeplanning

  5. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  6. Design of Preventive Maintenance Scheduling Model for ...

    African Journals Online (AJOL)

    Maintenance has gained in importance as a support function for ensuring equipment availability. Adoption of effective preventive maintenance culture in an industry can drastically reduce the cost of premature or over delayed maintenance, while accurate maintenance action can sustain continuous and reliable operation of ...

  7. Pavement maintenance scheduling using genetic algorithms

    OpenAIRE

    Yang, Chao; Remenyte-Prescott, Rasa; Andrews, John D.

    2015-01-01

    This paper presents a new pavement management system (PMS) to achieve the optimal pavement maintenance and rehabilitation (M&R) strategy for a highway network using genetic algorithms (GAs). Optimal M&R strategy is a set of pavement activities that both minimise the maintenance cost of a highway network and maximise the pavement condition of the road sections on the network during a certain planning period. NSGA-II, a multi-objective GA, is employed to perform pavement maintenance optimisatio...

  8. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  9. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  10. Optimization of Continuous Maintenance Availability Scheduling

    Science.gov (United States)

    2014-09-01

    of being mostly submerged at all times. Historically, submarines have been supported by surface ships that became de facto submarine tenders...order in which a work station would assemble and weld a ship together to maximize throughput and workspace usage. The algorithm is a heuristic but it...enable maintenance actions. For example, most welding done on the exterior sail of a submarine requires the setup of a scaffolding system called the

  11. Scheduling maintenance of electrical power transmission networks using genetic programming

    Energy Technology Data Exchange (ETDEWEB)

    Langdon, W.B.; Treleaven, P.C.

    1997-12-31

    The National Grid Company plc is responsible for the maintenance of the high voltage electricity transmission network in England and Wales. It must plan maintenance so as to minimise costs taking into account: (i) location and size of demand, (ii) generator capacities and availabilities, (iii) electricity carrying capacity of the remainder of the network, i.e. that part not undergoing maintenance. Previous work showed the combination of a genetic algorithm using an order or permutation chromosome combined with hand coded ``greedy`` optimisers can readily produce an optimal schedule for a four node test problem [10]. Following this the same GA has been used to find low cost schedules for the South Wales region of the UK high voltage power network. This paper describes the evolution of the best known schedule for the base South Wales problem using genetic programming starting from the hand coded heuristics used with the GA. (Author)

  12. Proposing New Heuristic Approaches for Preventive Maintenance Scheduling

    Directory of Open Access Journals (Sweden)

    majid Esmailian

    2013-08-01

    Full Text Available The purpose of preventive maintenance management is to perform a series of tasks that prevent or minimize production breakdowns and improve reliability of production facilities. An important objective of preventive maintenance management is to minimize downtime of production facilities. In order to accomplish this objective, personnel should efficiently allocate resources and determine an effective maintenance schedule. Gopalakrishnan (1997 developed a mathematical model and four heuristic approaches to solve the preventive maintenance scheduling problem of assigning skilled personnel to work with tasks that require a set of corresponding skills. However, there are several limitations in the prior work in this area of research. The craft combination problem has not been solved because the craft combination is assumed as given. The craft combination problem concerns the computation of all combinations of assigning multi skilled workers to accomplishment of a particular task. In fact, determining craft combinations is difficult because of the exponential number of craft combinations that are possible. This research provides a heuristic approach for determining the craft combination and four new heuristic approach solution for the preventive maintenance scheduling problem with multi skilled workforce constraints. In order to examine the new heuristic approach and to compare the new heuristic approach with heuristic approach of Gopalakrishnan (1997, 81 standard problems have been generated based on the criterion suggested by from Gopalakrishnan (1997. The average solution quality (SQ of the new heuristic approaches is 1.86% and in old heuristic approaches is 8.32%. The solution time of new heuristic approaches are shorter than old heuristic approaches. The solution time of new heuristic approaches is 0.78 second and old heuristic approaches is 6.43 second, but the solution time of mathematical model provided by Gopalakrishnan (1997 is 152 second.

  13. A multi-criteria model for maintenance job scheduling

    Directory of Open Access Journals (Sweden)

    Sunday A. Oke

    2007-12-01

    Full Text Available This paper presents a multi-criteria maintenance job scheduling model, which is formulated using a weighted multi-criteria integer linear programming maintenance scheduling framework. Three criteria, which have direct relationship with the primary objectives of a typical production setting, were used. These criteria are namely minimization of equipment idle time, manpower idle time and lateness of job with unit parity. The mathematical model constrained by available equipment, manpower and job available time within planning horizon was tested with a 10-job, 8-hour time horizon problem with declared equipment and manpower available as against the required. The results, analysis and illustrations justify multi-criteria consideration. Thus, maintenance managers are equipped with a tool for adequate decision making that guides against error in the accumulated data which may lead to wrong decision making. The idea presented is new since it provides an approach that has not been documented previously in the literature.

  14. JIT single machine scheduling problem with periodic preventive maintenance

    OpenAIRE

    Shahriari, Mohammadreza; Shoja, Naghi; Zade, Amir Ebrahimi; Barak, Sasan; Sharifi, Mani

    2016-01-01

    This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, tw...

  15. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  16. Power Grid Maintenance Scheduling Intelligence Arrangement Supporting System Based on Power Flow Forecasting

    Science.gov (United States)

    Xie, Chang; Wen, Jing; Liu, Wenying; Wang, Jiaming

    With the development of intelligent dispatching, the intelligence level of network control center full-service urgent need to raise. As an important daily work of network control center, the application of maintenance scheduling intelligent arrangement to achieve high-quality and safety operation of power grid is very important. By analyzing the shortages of the traditional maintenance scheduling software, this paper designs a power grid maintenance scheduling intelligence arrangement supporting system based on power flow forecasting, which uses the advanced technologies in maintenance scheduling, such as artificial intelligence, online security checking, intelligent visualization techniques. It implements the online security checking of maintenance scheduling based on power flow forecasting and power flow adjusting based on visualization, in order to make the maintenance scheduling arrangement moreintelligent and visual.

  17. JIT single machine scheduling problem with periodic preventive maintenance

    Science.gov (United States)

    Shahriari, Mohammadreza; Shoja, Naghi; Zade, Amir Ebrahimi; Barak, Sasan; Sharifi, Mani

    2016-03-01

    This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, two other optimization algorithms are used for comparing the results. Eventually, Taguchi method with metrics analysis is presented to tune the algorithms' parameters and a multiple criterion decision making technique based on the technique for order of preference by similarity to ideal solution is applied to choose the best algorithm. Comparison results confirmed the supremacy of MOPSO to the other algorithms.

  18. Single-Machine Scheduling with Aging Effects and Optional Maintenance Activity Considerations

    Directory of Open Access Journals (Sweden)

    Chou-Jung Hsu

    2013-01-01

    Full Text Available This paper explores a single-machine scheduling with aging effects and the problem regarding optional maintenance activity assignment. The jobs’ processing time is assumed to follow a power position-dependent aging model. The optional maintenance activity refers to the situation in which the maintenance activity can be scheduled immediately after processing of any job has been completed except for the last job and the duration of maintenance activity can be of any value from zero to a fixed time interval. A recovery function is proposed to reflect the efficiency of the machine or worker which is improved. The objective of this study is to decide whether and when to implement the maintenance activity into the job sequence, how long the duration of maintenance activity is, and how to schedule so as to minimize the makespan. Once the duration of maintenance activity is known, we introduce an efficient solution for this problem. In addition, when the maintenance activity is completely performed, we showed that the optimal policy is to schedule the maintenance activity in the middle of the task sequence and optimally solved it by lower order algorithm. Finally, we extend the problem to the case of multiple maintenance activities which are completely performed. Hence, the problem is regarded as polynomial time solvable.

  19. Mathematical model for preventive maintenance scheduling. [Deep Space Network

    Science.gov (United States)

    Lorden, G.; Remer, D. S.

    1979-01-01

    A model is formulated to describe the effect of the time interval chosen for preventive maintenance upon the frequency of failure and frequency of total maintenance. Trade-offs between these two frequencies are determined by computation of an optimal interval in the case where the failure distribution is known. For unknown distributions, an adaptive statistical technique is developed that converges to an optimal preventive maintenance interval. A numerical illustration is given.

  20. Reliability Centered Maintenance in Schedule Improvement of Automotive Assembly Industry

    OpenAIRE

    Rizauddin Ramli; Mohammad Nizam Arffin

    2012-01-01

    Problem statement: Today, in many automotive manufacturing companies, maintenance management is an important factor to maintain the plant operation and production equipments. Approach: In this study, we present an implementation of Reliability Centered Maintenance (RCM) practice in one of the automotive manufacturing company in Malaysia. The RCM practice was used to assist the company in focusing their maintenance activities based on the criticalities of the equipments by applying the Failure...

  1. Coordination between Generation and Transmission Maintenance Scheduling by Means of Multi-agent Technique

    Science.gov (United States)

    Nagata, Takeshi; Tao, Yasuhiro; Utatani, Masahiro; Sasaki, Hiroshi; Fujita, Hideki

    This paper proposes a multi-agent approach to maintenance scheduling in restructured power systems. The restructuring of electric power industry has resulted in market-based approaches for unbundling a multitude of service provided by self-interested entities such as power generating companies (GENCOs), transmission providers (TRANSCOs) and distribution companies (DISCOs). The Independent System Operator (ISO) is responsible for the security of the system operation. The schedule submitted to ISO by GENCOs and TRANSCOs should satisfy security and reliability constraints. The proposed method consists of several GENCO Agents (GAGs), TARNSCO Agents (TAGs) and a ISO Agent(IAG). The IAG’s role in maintenance scheduling is limited to ensuring that the submitted schedules do not cause transmission congestion or endanger the system reliability. From the simulation results, it can be seen the proposed multi-agent approach could coordinate between generation and transmission maintenance schedules.

  2. Measuring robustness of port plug maintenance schedules in fusion remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Schoen, P.W., E-mail: p.w.schoen@heemskerk-innovative.nl [Heemskerk Innovative Technology, Sassenheim (Netherlands); Thomas, J. [CCFE EURATOM/CCFE Fusion Association, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Boessenkool, H. [FOM Institute DIFFER, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Heemskerk, C.J.M. [Heemskerk Innovative Technology, Sassenheim (Netherlands)

    2015-12-15

    Unexpected events during maintenance operations of a fusion plant like JET or ITER may require rescheduling, suspending the execution of the current procedure to pick it up later. In this paper, we look at how the introduction of slack influences the port plug maintenance schedule robustness. We introduce a metrics to measure the robustness. Simulating disruptions we evaluate the effect on a schedule. Finally, we show how the robustness is affected when introducing different amounts of slack.

  3. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling - abstract

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  4. Operations Research Models for Scheduling Railway Infrastructure Maintenance

    NARCIS (Netherlands)

    G. Budai-Balke (Gabriella)

    2009-01-01

    textabstractIn the last decades, maintenance of technical systems has become increasingly impor- tant in many industries. Such systems are transport systems (rail, bus, airplane), civil engineering systems (roads, buildings, bridges), health care (hospitals), communication systems, manufacturing

  5. Scheduling a maintenance activity under skills constraints to minimize total weighted tardiness and late tasks

    Directory of Open Access Journals (Sweden)

    Djalal Hedjazi

    2015-04-01

    Full Text Available Skill management is a key factor in improving effectiveness of industrial companies, notably their maintenance services. The problem considered in this paper concerns scheduling of maintenance tasks under resource (maintenance teams constraints. This problem is generally known as unrelated parallel machine scheduling. We consider the problem with a both objectives of minimizing total weighted tardiness (TWT and number of tardiness tasks. Our interest is focused particularly on solving this problem under skill constraints, which each resource has a skill level. So, we propose a new efficient heuristic to obtain an approximate solution for this NP-hard problem and demonstrate his effectiveness through computational experiments. This heuristic is designed for implementation in a static maintenance scheduling problem (with unequal release dates, processing times and resource skills, while minimizing objective functions aforementioned.

  6. Diagnostics of heavy mining equipment during the scheduled preventive maintenance

    Science.gov (United States)

    Drygin, M. Yu; Kuryshkin, N. P.

    2018-01-01

    Intensification of production, economic globalization and dramatic downgrade of the workers’ professional skills lead to unacceptable technical state of heavy mining equipment. Equipment maintenance outage reaches 84 % of the total downtime, of which emergency maintenance takes up to 36 % of time, that excesses 429 hours per year fr one excavator. It is shown that yearly diagnostics using methods of non-destructive check allows to reduce emergency downtime by 47 %, and 55 % of revealed defects can be eliminated without breaking the technological cycle of the equipment.

  7. The influence of condition-based maintenance on workforce planning and maintenance scheduling

    NARCIS (Netherlands)

    Koochaki, Javid; Bokhorst, Jos A. C.; Wortmann, Hans; Klingenberg, Warse

    2013-01-01

    Condition-based maintenance (CBM) is generally considered an attractive maintenance policy for a single component: it uses the operating condition of the component to predict a failure event and therefore tries to avoid any unplanned downtime and unnecessary maintenance activities. However,

  8. PRIORITY DISPATCH SCHEDULING IN AN AUTOMOBILE REPAIR AND MAINTENANCE WORKSHOP

    Directory of Open Access Journals (Sweden)

    KOYEJO OYEBOLA T.

    2011-10-01

    Full Text Available This research work applied a simulation model in determining the optimal number of artisans to employ to carry out routine checks on vehicles on a waiting line. The waiting line under consideration is that of an automobile repair and maintenance workshop in South- Western Nigeria. The data collection was based on arrival pattern of vehicles and service pattern of artisans in the maintenance workshop. A discrete distribution was assumed for both the inter–arrival and service time patterns. An optimal number of 7 servers serving one queue were obtained as against 4 servers and 1 queue in the system in use. There was also a savings in cost of N2.45 Million per month when compared to the system in use. The results of this research work will be significant and important for decision making.

  9. A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem

    DEFF Research Database (Denmark)

    Rahmati, Seyed Habib A.; Ahmadi, Abbas; Govindan, Kannan

    2018-01-01

    production problem called flexible job shop scheduling problem (FJSP). This integrated problem considers two maintenance scenarios in terms of corrective maintenance (CM) and preventive maintenance (PM). The activation of scenario is done by monitoring the degradation condition of the system and comparing......Integrated consideration of production planning and maintenance processes is a real world assumption. Specifically, by improving the monitoring equipment such as various sensors or product-embedded information devices in recent years, joint assessment of these processes is inevitable for enhancing...... the level of the system optimization. By means of this equipment, managers can benefit from a condition-based maintenance (CBM) for monitoring and managing their system. The chief aim of the paper is to develop a stochastic maintenance problem based on CBM activities engaged with a complex applied...

  10. Value Analysis of Engine Maintenance Scheduling relative to Fuel Burn and Minimal Operating Costs

    NARCIS (Netherlands)

    Curran, R.; Van der Zwan, F.M.; Ouwehand, A.; Ghijs, S.S.A.

    2010-01-01

    The paper presents the results from a study in collaboration with an airline that looked at modeling the relationship of maintenance and fuel burn costs relative to minimizing the life cycle cost relative to schedule. The work has verified that the bucket theory presented in the paper is a correct

  11. Scheduling Jobs with Maintenance Subject to Load-Dependent Duration on a Single Machine

    Directory of Open Access Journals (Sweden)

    Yawei Qi

    2015-01-01

    Full Text Available This paper investigates a scheduling problem on a single machine with maintenance, in which the starting time of the maintenance is given in advance but its duration depends on the load of the machine before the maintenance. The goal is to minimize the makespan. We formulate it as an integer programming model and show that it is NP-hard in the ordinary sense. Then, we propose an FPTAS and point out that a special case is polynomial solvable. Finally, we design fast heuristic algorithms to solve the scheduling problem. Numerical experiments are implemented to evaluate the performance of the proposed heuristic algorithms. The results show the proposed heuristic algorithms are effective.

  12. Comparative study of heuristics algorithms in solving flexible job shop scheduling problem with condition based maintenance

    Directory of Open Access Journals (Sweden)

    Yahong Zheng

    2014-05-01

    Full Text Available Purpose: This paper focuses on a classic optimization problem in operations research, the flexible job shop scheduling problem (FJSP, to discuss the method to deal with uncertainty in a manufacturing system.Design/methodology/approach: In this paper, condition based maintenance (CBM, a kind of preventive maintenance, is suggested to reduce unavailability of machines. Different to the simultaneous scheduling algorithm (SSA used in the previous article (Neale & Cameron,1979, an inserting algorithm (IA is applied, in which firstly a pre-schedule is obtained through heuristic algorithm and then maintenance tasks are inserted into the pre-schedule scheme.Findings: It is encouraging that a new better solution for an instance in benchmark of FJSP is obtained in this research. Moreover, factually SSA used in literature for solving normal FJSPPM (FJSP with PM is not suitable for the dynamic FJSPPM. Through application in the benchmark of normal FJSPPM, it is found that although IA obtains inferior results compared to SSA used in literature, it performs much better in executing speed.Originality/value: Different to traditional scheduling of FJSP, uncertainty of machines is taken into account, which increases the complexity of the problem. An inserting algorithm (IA is proposed to solve the dynamic scheduling problem. It is stated that the quality of the final result depends much on the quality of the pre-schedule obtained during the procedure of solving a normal FJSP. In order to find the best solution of FJSP, a comparative study of three heuristics is carried out, the integrated GA, ACO and ABC. In the comparative study, we find that GA performs best in the three heuristic algorithms. Meanwhile, a new better solution for an instance in benchmark of FJSP is obtained in this research.

  13. Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches

    Energy Technology Data Exchange (ETDEWEB)

    Dahal, Keshav P. [School of Informatics, University of Bradford, Bradford (United Kingdom); Chakpitak, Nopasit [College of Arts, Media and Technology, Chiang Mai University, Chiang Mai (Thailand)

    2007-05-15

    The effective maintenance scheduling of power system generators is very important for the economical and reliable operation of a power system. This represents a tough scheduling problem which continues to present a challenge for efficient optimization solution techniques. This paper presents the application of metaheuristic approaches, such as a genetic algorithm (GA), simulated annealing (SA) and their hybrid for generator maintenance scheduling (GMS) in power systems using an integer representation. This paper mainly focuses on the application of GA/SA and GA/SA/heuristic hybrid approaches. GA/SA hybrid uses the probabilistic acceptance criterion of SA within the GA framework. GA/SA/heuristic hybrid combines heuristic approaches within the GA/SA hybrid to seed the initial population. A case study is formulated in this paper as an integer programming problem using a reliability-based objective function and typical problem constraints. The implementation and performance of the metaheuristic approaches and their hybrid for the test case study are discussed. The results obtained are promising and show that the hybrid approaches are less sensitive to the variations of technique parameters and offer an effective alternative for solving the generator maintenance scheduling problem. (author)

  14. Scheduling of Maintenance Tasks and Routing of a Joint Vessel Fleet for Multiple Offshore Wind Farms

    Directory of Open Access Journals (Sweden)

    Nora Tangen Raknes

    2017-02-01

    Full Text Available Maintenance costs related to offshore wind farms are severely limiting their potential for being profitable. This paper proposes a new mathematical model that considers how maintenance tasks should be scheduled and performed by technicians transported using a fleet of dedicated vessels. The model is novel in its combination of modelling several work shifts and including vessels that can stay offshore for several shifts, while handling large maintenance tasks and accurate calculation of downtime costs. Simulation is used to evaluate the performance of the model in its pure form, as well as when solved heuristically using a rolling horizon heuristic. The results indicate that the end-of-horizon effects of the mathematical formulation are handled effectively. Computational experiments also illustrate how the mathematical model coupled with simulation can be used to evaluate strategic decisions regarding the composition of a vessel fleet used to execute maintenance tasks.

  15. Strategic Maintenance Scheduling of an Offshore Wind Farm in a Deregulated Power System

    Directory of Open Access Journals (Sweden)

    Peyman Mazidi

    2017-03-01

    Full Text Available This paper proposes a model for strategic maintenance scheduling of offshore wind farms (SMSOWF in a deregulated power system. The objective of the model is to plan the maintenance schedules in a way to maximize the profit of the offshore wind farm. In addition, some network constraints, such as transmission lines capacity, and wind farm constraints, such as labor working shift, wave height limit and wake effect, as well as unexpected outages, are included in deterministic and stochastic studies. Moreover, the proposedmodel provides theability to incorporate information from condition monitoring systems. SMSOWF is formulated through a bi-level formulation and then transformed into a single-level through Karush–Kuhn–Tucker conditions. The model is validated through a test system, and the results demonstrate applicability, advantages and challenges of harnessing the full potential of the model.

  16. Multiobjective Joint Optimization of Production Scheduling and Maintenance Planning in the Flexible Job-Shop Problem

    Directory of Open Access Journals (Sweden)

    Jianfei Ye

    2015-01-01

    Full Text Available In order to solve the joint optimization of production scheduling and maintenance planning problem in the flexible job-shop, a multiobjective joint optimization model considering the maximum completion time and maintenance costs per unit time is established based on the concept of flexible job-shop and preventive maintenance. A weighted sum method is adopted to eliminate the index dimension. In addition, a double-coded genetic algorithm is designed according to the problem characteristics. The best result under the circumstances of joint decision-making is obtained through multiple simulation experiments, which proves the validity of the algorithm. We can prove the superiority of joint optimization model by comparing the result of joint decision-making project with the result of independent decision-making project under fixed preventive maintenance period. This study will enrich and expand the theoretical framework and analytical methods of this problem; it provides a scientific decision analysis method for enterprise to make production plan and maintenance plan.

  17. Inflammatory bowel disease patients are frequently nonadherent to scheduled induction and maintenance infliximab therapy: A Canadian cohort study

    Science.gov (United States)

    Ma, Christopher; Evaschesen, Chad J; Gracias, Grenvil; Huang, Vivian W; Fedorak, Darryl K; Kroeker, Karen I; Dieleman, Levinus A; Halloran, Brendan P; Fedorak, Richard N

    2015-01-01

    BACKGROUND: Adherence to maintenance medication regimens in inflammatory bowel disease patients has traditionally been poor. Although infliximab has demonstrated efficacy in inducing and maintaining disease remission, adherence to regularly scheduled infliximab infusions is required to maintain therapeutic trough drug levels and prevent the development of anti-infliximab antibodies. OBJECTIVES: To characterize patient adherence to regularly scheduled induction and maintenance infliximab infusions. METHODS: A retrospective cohort study was conducted evaluating adult outpatients with Crohn disease or ulcerative colitis on an induction or maintenance regimen of regularly scheduled infliximab from 2008 to 2010 at the University of Alberta (Edmonton, Alberta). Nonadherence was defined by a discrepancy of >72 h between the scheduled date of infusion and the actual date of administration. Patients were defined as nonadherent if they received infliximab infusions per schedule. RESULTS: A total of 215 patients (173 Crohn disease, 42 ulcerative colitis) met the inclusion criteria. Patients received a median of 12.0 infliximab infusions (interquartile range 7.0 to 13.0) during the study period; 412 induction and 1837 maintenance infliximab infusions were administered. Of 140 patients, 109 (77.9%) were adherent to their infliximab induction regimen, while 68 of 215 (31.6%) were adherent to their infliximab maintenance regimen. One hundred ninety-eight of 215 (92.1%) patients received at least one delayed maintenance infliximab infusion and 20 (10.1%) received maintenance infusions, on average, >1 week late. CONCLUSIONS: While three-quarters of patients are adherent to infliximab induction therapy, fewer than one-third remained adherent to their scheduled maintenance infliximab regimen. PMID:26069894

  18. Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-04-01

    Full Text Available This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.

  19. Hybrid Particle Swarm Optimization for Hybrid Flowshop Scheduling Problem with Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Jun-qing Li

    2014-01-01

    Full Text Available A hybrid algorithm which combines particle swarm optimization (PSO and iterated local search (ILS is proposed for solving the hybrid flowshop scheduling (HFS problem with preventive maintenance (PM activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron’s benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm.

  20. Hybrid particle swarm optimization for hybrid flowshop scheduling problem with maintenance activities.

    Science.gov (United States)

    Li, Jun-qing; Pan, Quan-ke; Mao, Kun

    2014-01-01

    A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm.

  1. The Offering, Scheduling and Maintenance of Elective Advanced Pharmacy Practice Experiences

    Directory of Open Access Journals (Sweden)

    Rex O. Brown

    2015-12-01

    Full Text Available The Accreditation Council for Pharmacy Education (ACPE provides standards for colleges of pharmacy to assist in the provision of pharmacy education to student pharmacists. An integral part of all college educational programs includes the provision of experiential learning. Experiential learning allows students to gain real-world experience in direct patient care during completion of the curriculum. All college of pharmacy programs provide several Advanced Pharmacy Practice Experiences (APPEs, which include a balance between the four required experiences and a number of other required or elective APPEs. Required APPEs include advanced community, advanced institutional, ambulatory care, and general medicine. The elective APPEs include a myriad of opportunities to help provide a balanced education in experiential learning for student pharmacists. These unique opportunities help to expose student pharmacists to different career tracks that they may not have been able to experience otherwise. Not all colleges offer enough elective APPEs to enable the student pharmacist to obtain experiences in a defined area. Such an approach is required to produce skilled pharmacy graduates that are capable to enter practice in various settings. Elective APPEs are scheduled logically and are based upon student career interest and site availability. This article describes the offering, scheduling and maintenance of different elective APPEs offered by The University of Tennessee College of Pharmacy.

  2. Schedules of food postponement: II. Maintenance of behavior by food postponement and effects of the schedule parameter.

    Science.gov (United States)

    Clark, F C; Smith, J B

    1977-11-01

    In Experiment I, food-deprived, feeder-trained squirrel monkeys pressed a lever to postpone brief electric shocks (Response-Shock=Shock-Shock interval=30 seconds). Forty-one three-hour sessions of shock postponement were followed by 120 sessions of concurrent shock and food postponement. The shock schedule was unchanged and the food schedule was Response-food interval-20 seconds, Food-food interval 10 seconds. After concurrent shock and food postponement, the shock schedule was discontinued and 40 sessions of food postponement ensued, followed by 53 sessions of extinction. After extinction, food postponement was resumed for 11 sessions. Stable responding with low food rates was maintained under food-postponement after the concurrent schedule. Responding decreased to low levels under extinction and recovered immediately to previous levels when the food-postponement schedule was re-instated. In Experiment II, a parameter of the food-postponement schedule was studied sequentially. Using the same subjects, the Response-food-Food-food interval was manipulated from four seconds to 80 seconds with several orders of presentation. Relations of response rates and food rates to the parameter were similar to those seen under shock postponement. Exposure to very short postponement times (four seconds), resulting in very high food rates, decreased but did not abolish subsequent responding at longer postponement times. Results are discussed from the point of view that reinforcing functions of stimuli consequent on responding depend on a prior history of scheduled contact with those stimuli.

  3. A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem

    DEFF Research Database (Denmark)

    Pour, Shahrzad M.; Drake, John H.; Ejlertsen, Lena Secher

    2017-01-01

    A railway signaling system is a complex and interdependent system which should ensure the safe operation of trains. We introduce and address a mixed integer optimisation model for the preventive signal maintenance crew scheduling problem in the Danish railway system. The problem contains many pra...

  4. Testing and preventive maintenance scheduling optimization for aging systems modeled by generalized renewal process

    Directory of Open Access Journals (Sweden)

    Vinícius Correa Damaso

    2009-12-01

    Full Text Available The use of stochastic point processes to model the reliability of repairable systems has been a regular approach to establish survival measures in failure versus repair scenarios. However, the traditional processes do not consider the actual state in which an item returns to operational condition. The traditional renewal process considers an "as-good-as-new" philosophy, while a non-homogeneous Poisson process is based on the minimal repair concept. In this work, an approach based on the concept of Generalized Renewal Process (GRP is presented, which is a generalization of the renewal process and the non-homogeneous Poisson process. A stochastic modeling is presented for systems availability analysis, including testing and/or preventive maintenances scheduling. To validate the proposed approach, it was performed a case study of a hypothetical auxiliary feed-water system of a nuclear power plant, using genetic algorithm as optimization tool.O uso de processos estocásticos pontuais para modelar a confiabilidade de sistemas reparáveis tem sido constante para estabelecer medidas de sobrevivência em cenários de falha versus reparo. Entretanto, os processos tradicionais não consideram o real estado no qual um item retorna à condição operacional. O processo de renovação tradicional considera uma filosofia de "tão-bom-quanto-novo", enquanto um processo não-homogêneo de Poisson é baseado no conceito de reparo mínimo. Neste trabalho, é apresentada uma abordagem baseada no conceito de Processo de Renovação Generalizado (PRG, que é uma generalização de processo de renovação e de processo não-homogêneo de Poisson. Uma modelagem estocástica será apresentada para análise de disponibilidade de sistemas, incluindo planejamento de testes e/ou manutenção preventiva. Para validar a abordagem proposta, um estudo de caso foi desenvolvido para um hipotético sistema auxiliar de água de alimentação de uma usina nuclear, usando algoritmo

  5. The Preventive Signaling Maintenance Crew Scheduling Problem for European Railway Traffic Management system (ERTMS)

    DEFF Research Database (Denmark)

    Mohammad Pour, Shahrzad; Stidsen, Thomas Jacob Riis; Rasmussen, Kourosh Marjani

    A railway system is a large and complex infrastructure, which requires continuous maintenance in order to function correctly. Proper maintenance is critical but can also be costly. In this paper we consider the practical case of planning the preventive maintenance of railway signals in Jutland......, the western part of Denmark. This case is particularly interesting, since the entire railway signalling system is currently being upgraded to the new European Railway Traffic Management System (ERTMS) standard. The new signals need continuous maintenance and in this article we plan the distribution of crew...

  6. Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Seyyed Mohammad Hassan Hosseini

    2016-05-01

    Full Text Available Scheduling problem for the hybrid flow shop scheduling problem (HFSP followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All machines can process all kinds of parts in this stage but each machine can process only one part at the same time. The second stage is a single assembly machine or a single assembly team of workers. The aim is to schedule the parts on the machines and assembly sequence and also determine when the preventive maintenance activities get done in order to minimize the completion time of all products (makespan. A mathematical modeling is presented and its validation is shown by solving an example in small scale. Since this problem has been proved strongly NP-hard, in order to solve the problem in medium and large scale, four heuristic algorithms is proposed based on the Johnson’s algorithm. The numerical experiments are used to run the mathematical model and evaluate the performance of the proposed algorithms.

  7. Determining optimal maintenance schedules for adjuvant intravesical bacillus Calmette-Guerin immunotherapy in non-muscle-invasive bladder cancer: a systematic review and network meta-analysis.

    Science.gov (United States)

    Huang, Zixiong; Liu, Huixin; Wang, Yizeng; Zhang, Chunfang; Xu, Tao

    2017-08-01

    To figure out optimal bacillus Calmette-Guerin (BCG) maintenance schedules for non-muscle-invasive bladder cancer (NMIBC) patients by comparing different schedules in a systematic review using conventional and network meta-analysis. Literature was searched in the databases of Medline, Embase, Cochrane library, Clinicaltrials.gov, Wanfang, CNKI and SinoMed in April 2016 and 9 randomized clinical trials comparing intravesical BCG maintenance therapy with BCG induction-only therapy or comparing different BCG maintenance schedules (induction-only, 1 year, 1.5 year, 2 year, 3 year maintenance) in NMIBC patients were included. Conventional and network meta-analyses within a Bayesian framework were performed to calculate odds ratios of tumor recurrence, progression and side effects (cystitis, hematuria, general malaise and fever). The surface under the cumulative ranking curve (SUCRA) mean ranking was used to obtain schedule hierarchy. Data from 1951 patients showed that longer-term maintenance BCG therapy does not significantly decrease tumor recurrence and progression rate of NMIBC compared to shorter-term maintenance BCG therapy. However, longer-maintenance therapy does not increase side effect incidence compared to induction-only therapy. According to SUCRA results, induction-only therapy has the highest probability of recurrence and progression but least probability of side effects. Longer BCG maintenance therapy (such as 3 years) is not superior to shorter maintenance therapy (such as 1 year). But maintenance therapy overall is better than induction-only BCG therapy while not increasing side effects. Though further evidence and clinical practice with balanced confounding factors (risk stratification and BCG strain) are wished for, the current study suggests the common use of 1 year intravesical BCG instillation for NMIBC patients.

  8. Influence of titration schedule and maintenance dose on the tolerability of adjunctive eslicarbazepine acetate: An integrated analysis of three randomized placebo-controlled trials.

    Science.gov (United States)

    Krauss, Gregory; Biton, Victor; Harvey, Jay H; Elger, Christian; Trinka, Eugen; Soares da Silva, Patrício; Gama, Helena; Cheng, Hailong; Grinnell, Todd; Blum, David

    2018-01-01

    To examine the influence of titration schedule and maintenance dose on the incidence and type of treatment-emergent adverse events (TEAEs) associated with adjunctive eslicarbazepine acetate (ESL). Data from three randomized, double-blind, placebo-controlled trials were analyzed. Patients with refractory partial-onset seizures were randomized to maintenance doses of ESL 400, 800, or 1200mg QD (dosing was initiated at 400 or 800mg QD) or placebo. The incidence of TEAEs was analyzed during the double-blind period (2-week titration phase; 12-week maintenance phase), according to the randomized maintenance dose and the titration schedule. 1447 patients were included in the analysis. During the first week of treatment, 62% of patients taking ESL 800mg QD had ≥1 TEAE, vs 35% of those taking 400mg QD and 32% of the placebo group; dizziness, somnolence, nausea, and headache were numerically more frequent in patients taking ESL 800mg than those taking ESL 400mg QD. During the double-blind period, the incidences of common TEAEs were lower in patients who initiated ESL at 400mg vs 800mg QD. For the 800 and 1200mg QD maintenance doses, rates of TEAEs leading to discontinuation were lower in patients who began treatment with 400mg than in those who began taking ESL 800mg QD. Initiation of ESL at 800mg QD is feasible. However, initiating treatment with ESL 400mg QD for 1 or 2 weeks is recommended, being associated with a lower incidence of TEAEs, and related discontinuations. For some patients, treatment may be initiated at 800mg QD, if the need for more immediate seizure reduction outweighs concerns about increased risk of adverse reactions during initiation. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  9. Heroin self-administration under a second-order schedule of reinforcement: acquisition and maintenance of heroin-seeking behaviour in rats.

    Science.gov (United States)

    Alderson, H L; Robbins, T W; Everitt, B J

    2000-12-01

    Second-order schedules of heroin self-administration provide a method of measuring heroin-seeking behaviour independently of the effects of the drug on motor behaviour and of investigating the role of heroin-associated stimuli in such heroin-seeking behaviour. These experiments aimed to establish a second-order schedule of heroin self-administration in rats, similar to that already established in this laboratory for cocaine self-administration and to investigate the role of discrete heroin-associated stimuli in the maintenance of heroin-seeking behaviour under a second-order schedule of reinforcement. Heroin i.v. self-administration (0.04 mg/infusion) was initially contingent upon a lever press, and each infusion was paired with presentation of a 20-s light-conditioned stimulus (CS). Following acquisition of heroin self-administration, the response requirement was progressively increased so that, ultimately, responding was maintained under a fixed interval (FI) 15 min [fixed ratio (FR)5:S] second-order schedule. The effects of varying the dose of heroin (0.01 mg and 0.08 mg/infusion) and pre-treatment with the mu-opiate receptor antagonist, naloxone, on responding under a FI15(FR5:S) schedule were investigated. In addition, the role of the heroin-associated CS on responding was assessed by measuring the effects of omitting the CS during heroin-seeking behaviour and during extinction of responding, as well as the effect of CS presentation on the reinstatement of heroin-seeking behaviour following extinction. A second-order schedule of heroin self-administration was established. There were no clear effects on heroin-seeking behaviour of increasing or decreasing the dose of heroin. Although no effect of naloxone pre-treatment was seen on heroin-seeking behaviour during the first, drug-free interval of responding, an extinction-like pattern of responding was seen in that interval during subsequent sessions. Omission of the light CS resulted in a reduction in levels of

  10. Application of genetic algorithms to the maintenance scheduling optimization in a nuclear system basing on reliability; Aplicacao de algoritmos geneticos na otimizacao da politica de manutencoes preventivas de um sistema nuclear centrada em confiabilidade

    Energy Technology Data Exchange (ETDEWEB)

    Lapa, Celso M. Franklin; Pereira, Claudio M.N.A.; Mol, Antonio C. de Abreu [Instituto de Engenharia Nuclear (IEN), Rio de Janeiro, RJ (Brazil)

    1999-07-01

    This paper presents a solution based on genetic algorithm and probabilistic safety analysis that can be applied in the optimization of the preventive maintenance politic of nuclear power plant safety systems. The goal of this approach is to improve the average availability of the system through the optimization of the preventive maintenance scheduling politic. The auxiliary feed water system of a two loops pressurized water reactor is used as a sample case, in order to demonstrate the effectiveness of the proposed method. The results, when compared to those obtained by some standard maintenance politics, reveal quantitative gains and operational safety levels. (author)

  11. Optimization of maintenance scheduling with genetic algorithms regarding the storage behavior during the availability prognosis of power plants; Optimierung der Instandhaltungsplanung mit genetischen Algorithmen unter Beruecksichtigung des Speicherverhaltens bei der Verfuegbarkeitsprognose von Kraftwerksanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Warnecke, Martin

    2008-12-19

    In the age of the liberalized energy market the power plant raisers and operators have to consider several factors when choosing the fuel type and dimensioning their power plants, e.g. emissions, erection cost and last but not least operating cost. Simulations assuming different scenarios are required. The rivaling aspects of erection cost, partially dependant availability, maintenance philosophy and operating cost are motivating the optimization of maintenance scheduling and the availability prognosis which are the topic of this thesis. The focus of this thesis is on the scheduling of the time based maintenance strategy. This strategy defines the time spans between the repeating inspections of each component. This is based on the experience of operators and manufacturers. The mathematic problem itself is especially challenging because of strong interdependencies between the single components due to synergy effects. Each component has its own theoretically optimal lifetime and maintenance period. Yet as part of a compound it might be more cost efficient in the long run to maintain some components together shifting some of them forward or backward. The thereby caused interdependencies constitute a non-linear, mixed-whole-numbered calculation of the cost approximation. For the optimization of this maintenance scheduling a new approach was developed. It was realized that the problem couldn't be solved satisfyingly with classic optimization algorithms. Afterwards a solution based on ''genetic algorithms'' was developed. In the meantime the methods for the availability prognosis of complex power plant facilities were enhanced. Especially a new component with storage behavior (with optional losses) was added to the prognosis tool. This storage model integrates the behavior of a storage into the computing time reduced Monte-Carlo-Method. (orig.)

  12. The Circadian Schedule for Childhood Acute Lymphoblastic Leukemia Maintenance Therapy does not Influence Event-Free Survival in the NOPHO ALL92 Protocol

    DEFF Research Database (Denmark)

    Clemmensen, Kim K. B.; Christensen, Regitse H.; Shabaneh, Diana N.

    2014-01-01

    of MTX/6MP was scored as morning, midday, or evening. RESULTS: Of 532 patients, 296 took their medication consistently in the evening, 129 in the evening 50.0-99.9% of the time, and 101 in the evening ... significantly by age, sex, MTX/6MP doses, and average absolute neutrophil counts. The circadian schedule groups did differ on risk groups (P = 0.003) with fewer HR patients in the 50-99.9% group, and there was a negative correlation between percentage of time on evening schedule and average WBC (Spearman's rho...

  13. Automated preventive maintenance program

    Science.gov (United States)

    Cea, E. J.; Grieger, T. H.

    1971-01-01

    Maintenance program which is concise and inexpensive to operate adapts to almost any system that has a FORTRAN compiler. Program operates on a stored data base with an output consisting of scheduling information and various management reports.

  14. CAME-Computer Aided Maintenance Engineering: a new methodology to reduce maintenance life cycle cost pipelines (repair level, spares, preventive/scheduled/inspection and resources) by modeling, analysis and optimization

    Energy Technology Data Exchange (ETDEWEB)

    Bot, Yizhak [BQR Reliability Engineering Ltd. (Israel)

    2005-07-01

    In today's insecure and uncertain climate in the high-tech industry, where money is less accessible, companies are constantly searching for ways to cut expenses. Two important financial factors to consider are maintenance and down time when the equipment/system/processes are not functioning/operating. In this paper we shall describe a new technology, which will help designers and operators of complex systems to improve the reliability of the products and to reduce the maintenance cost, when they are used in field. These set of tools are interfaced to exist CAD/CAE and ERP/CMMS systems concurrently. (author)

  15. A solution approach based on Benders decomposition for the preventive maintenance scheduling problem of a stochastic large-scale energy system

    DEFF Research Database (Denmark)

    Lusby, Richard Martin; Muller, Laurent Flindt; Petersen, Bjørn

    2013-01-01

    to be regularly taken down for refueling and maintenance, in such away that the expected cost of meeting the power demand in a number of potential scenarios is minimized. We show that the problem structure naturally lends itself to Benders decomposition; however, not all constraints can be included in the mixed...

  16. Reducing costs by clustering maintenance activities for multiple critical units

    NARCIS (Netherlands)

    de Jonge, Bram; Klingenberg, Warse; Teunter, Ruud; Tinga, Tiedo

    Advances in sensor technology have enabled companies to make significant progress towards achieving condition-based maintenance (CBM). CBM provides the opportunity to perform maintenance actions more effectively. However, scheduling maintenance at the unit level may imply a high maintenance

  17. Reducing costs by clustering maintenance activities for multiple critical units

    NARCIS (Netherlands)

    de Jonge, Bram; Klingenberg, Warse; Teunter, Ruud; Tinga, Tiedo

    2015-01-01

    Advances in sensor technology have enabled companies to make significant progress towards achieving condition-based maintenance (CBM). CBM provides the opportunity to perform maintenance actions more effectively. However, scheduling maintenance at the unit level may imply a high maintenance

  18. Cryogenics maintenance strategy

    Science.gov (United States)

    Cruzat, Fabiola

    2012-09-01

    ALMA is an interferometer composed of 66 independent systems, with specific maintenance requirements for each subsystem. To optimize the observation time and reduce downtime maintenance, requirements are very demanding. One subsystem with high maintenance efforts is cryogenics and vacuum. To organize the maintenance, the Cryogenic and Vacuum department is using and implementing different tools. These are monitoring and problem reporting systems and CMMS. This leads to different maintenance approaches: Preventive Maintenance, Corrective Maintenance and Condition Based Maintenance. In order to coordinate activities with other departments the preventive maintenance schedule is kept as flexible as systems allow. To cope with unavoidable failures, the team has to be prepared to work under any condition with the spares on time. Computerized maintenance management system (CMMS) will help to manage inventory control for reliable spare part handling, the correct record of work orders and traceability of maintenance activities. For an optimized approach the department is currently evaluating where preventive or condition based maintenance applies to comply with the individual system demand. Considering the change from maintenance contracts to in-house maintenance will help to minimize costs and increase availability of parts. Due to increased number of system and tasks the cryo team needs to grow. Training of all staff members is mandatory, in depth knowledge must be built up by doing complex maintenance activities in the Cryo group, use of advanced computerized metrology systems.

  19. A cost driven predictive maintenance policy for structural airframe maintenance

    Directory of Open Access Journals (Sweden)

    Yiwei WANG

    2017-06-01

    Full Text Available Airframe maintenance is traditionally performed at scheduled maintenance stops. The decision to repair a fuselage panel is based on a fixed crack size threshold, which allows to ensure the aircraft safety until the next scheduled maintenance stop. With progress in sensor technology and data processing techniques, structural health monitoring (SHM systems are increasingly being considered in the aviation industry. SHM systems track the aircraft health state continuously, leading to the possibility of planning maintenance based on an actual state of aircraft rather than on a fixed schedule. This paper builds upon a model-based prognostics framework that the authors developed in their previous work, which couples the Extended Kalman filter (EKF with a first-order perturbation (FOP method. By using the information given by this prognostics method, a novel cost driven predictive maintenance (CDPM policy is proposed, which ensures the aircraft safety while minimizing the maintenance cost. The proposed policy is formally derived based on the trade-off between probabilities of occurrence of scheduled and unscheduled maintenance. A numerical case study simulating the maintenance process of an entire fleet of aircrafts is implemented. Under the condition of assuring the same safety level, the CDPM is compared in terms of cost with two other maintenance policies: scheduled maintenance and threshold based SHM maintenance. The comparison results show CDPM could lead to significant cost savings.

  20. Network maintenance

    CERN Multimedia

    IT Department

    2009-01-01

    A site wide network maintenance has been scheduled for Saturday 28 February. Most of the network devices of the General Purpose network will be upgraded to a newer software version, in order to improve our network monitoring capabilities. This will result in a series of short (2-5 minutes) random interruptions everywhere on the CERN sites along this day. This upgrade will not affect: the Computer centre itself, building 613, the Technical Network and the LHC experiments dedicated networks at the pits. Should you need more details on this intervention, please contact Netops by phone 74927 or email mailto:Netops@cern.ch. IT/CS Group

  1. Network maintenance

    CERN Multimedia

    GS Department

    2009-01-01

    A site-wide network maintenance operation has been scheduled for Saturday 28 February. Most of the network devices of the general purpose network will be upgraded to a newer software version, in order to improve our network monitoring capabilities. This will result in a series of short (2-5 minutes) random interruptions everywhere on the CERN sites throughout the day. This upgrade will not affect the Computer Centre itself, Building 613, the Technical Network and the LHC experiments, dedicated networks at the pits. For further details of this intervention, please contact Netops by phone 74927 or e-mail mailto:Netops@cern.ch. IT/CS Group

  2. Maintenance of ovulation inhibition with a new progestogen-only pill containing drospirenone after scheduled 24-h delays in pill intake

    DEFF Research Database (Denmark)

    Duijkers, Ingrid J M; Heger-Mahn, Doris; Drouin, Dominique

    2016-01-01

    OBJECTIVES: Traditional progestogen-only pills (POPs) have stringent daily timing and missed pill rules that might affect contraceptive reliability. A new-generation oestrogen-free pill has been developed, containing 4-mg drospirenone with a unique regimen of 24 active treatment days followed...... of ovulation was maintained after four scheduled 24-h delays in tablet intake. STUDY DESIGN: One hundred thirty healthy women with proven ovulatory cycles were randomized, and 127 were treated with the drospirenone-only pill during two cycles. In treatment Group A (n=62), 24-h delays in tablet intake were...... inhibition by the new-generation oestrogen-free pill, containing 4-mg drospirenone for 24 days followed by a 4-day treatment-free period, was maintained despite four 24-h delays in tablet intake, so the impact of delayed intake on contraceptive reliability will be low....

  3. Laboratory services series: a programmed maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Tuxbury, D.C.; Srite, B.E.

    1980-01-01

    The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

  4. La programación del mantenimiento del alumbrado viario y el impacto en su eficiencia energética; The road lighting maintenance schedule and the impact in their energy efficiency

    Directory of Open Access Journals (Sweden)

    Israel Omar Mockey Coureaux

    2011-06-01

    Full Text Available Se presenta un estudio acerca de la influencia de las acciones de mantenimiento en las instalaciones de alumbradoviario. Se abordan los aspectos relacionados con las causas de depreciación de estos sistemas y las acciones demantenimiento para su corrección. Se conceptualiza la eficiencia energética para el caso del alumbrado viario y semencionan todos los aspectos relacionados con ello. Los autores llaman la atención acerca de que frecuentementelos análisis para incrementar la eficiencia de estos sistemas de alumbrado solo se centran en las posibilidades decambio y mejoramiento de las lámparas, balastos, luminarias, así como las técnicas de regulación y control. En elartículo se hace énfasis en cómo a través del establecimiento del programa de mantenimiento que se defina sepuede impactar en la eficiencia energética desde la etapa de diseño y durante su explotación, resaltando laspotencialidades en esta vía poco estudiada hasta este momento.   A study about maintenance actions influences in road lighting efficiency is presented. The aspects related with thecauses of the luminous depreciation of road lighting systems and the maintenance actions are approached for theircorrection. The energy efficiency is conceptualized for the road lighting case and all the aspects can be impacted toincrease it are mentioned. The authors emphasis stands out that attention that usually the analyses to increase theefficiency of these systems is frequently focused only on the possibilities of change and improvement of the lamps,ballasts, luminaries and the control and regulation techniques to increase the efficiency of road lighting. The paperanalyses how through a maintenance schedule it can impact on the energy efficiency from the design stage andduring their exploitation, standing out the potentialities in this way little studied until this moment.

  5. Data Base Development of Automobile and Light Truck Maintenance : Volume II. Appendix E.

    Science.gov (United States)

    1978-08-01

    The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...

  6. Data Base Development of Automobile and Light Truck Maintenance : Volume III. Appendix F.

    Science.gov (United States)

    1978-08-01

    The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...

  7. Maintenance of ovulation inhibition with a new progestogen-only pill containing drospirenone after scheduled 24-h delays in pill intake.

    Science.gov (United States)

    Duijkers, Ingrid J M; Heger-Mahn, Doris; Drouin, Dominique; Colli, Enrico; Skouby, Sven

    2016-04-01

    Traditional progestogen-only pills (POPs) have stringent daily timing and missed pill rules that might affect contraceptive reliability. A new-generation oestrogen-free pill has been developed, containing 4-mg drospirenone with a unique regimen of 24 active treatment days followed by four placebo tablets. A previous study showed that this new drospirenone-only pill effectively inhibited ovulation. Clinical efficacy, however, can be affected by compliance, and delayed or forgotten pill intake often occurs in daily life. The aim of this study was to investigate if inhibition of ovulation was maintained after four scheduled 24-h delays in tablet intake. One hundred thirty healthy women with proven ovulatory cycles were randomized, and 127 were treated with the drospirenone-only pill during two cycles. In treatment Group A (n=62), 24-h delays in tablet intake were scheduled on days 3, 6, 11 and 22 during Cycle 2 and, in treatment Group B (n=65) during Cycle 1, respectively. Ovulation was defined as disappearance or persistence of a large follicle and progesterone levels higher than 5 ng/mL for at least 5 consecutive days. The overall ovulation rate was 0.8%; only one subject in Group A fulfilled the ovulation criteria in Cycle 2. Follicular diameters in the regular-intake and the delayed-intake cycles were similar. Despite the 4-day hormone-free period and multiple intentional 24-h delays in tablet intake, ovulation inhibition was maintained. This property distinguishes this new-generation oestrogen-free pill from traditional POPs by allowing the same "safety window" or flexibility in intake as combined oral contraceptives without compromising contraceptive reliability. Delayed or forgotten pill intake is very common. Ovulation inhibition by the new-generation oestrogen-free pill, containing 4-mg drospirenone for 24 days followed by a 4-day treatment-free period, was maintained despite four 24-h delays in tablet intake, so the impact of delayed intake on contraceptive

  8. Twelve-hour brain lithium concentration in lithium maintenance treatment of manic-depressive disorder: daily versus alternate-day dosing schedule

    DEFF Research Database (Denmark)

    Jensen, H.V.; Plenge, P; Stensgaard, A

    1996-01-01

    The 12-h brain lithium concentration was measured by lithium-7 magnetic resonance spectroscopy in ten manic-depressive patients receiving daily or alternate-day lithium carbonate treatment. The median dose of lithium carbonate was 800 mg in the daily treatment group and 1200 mg in the alternate......-day group. Median 12-h serum lithium concentration in the two groups was 0.86 mmol l-1 and 0.55 mmol l-1, respectively, while the corresponding concentration in brain was 0.67 mmol l-1 and 0.52 mmol l-1, respectively. The 12-h brain lithium concentration was independent of lithium dosing schedule (multiple...... linear regression), but correlated significantly with the 12-h serum lithium concentration (P = 0.003; B = 0.53, 95% c.l. 0.24-0.82; beta = 0.83). Thus at identical 12-h serum lithium concentrations the 12-h brain lithium concentration is similar with both treatment regimes. As the risk of manic...

  9. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  10. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  11. Random maintenance policies

    CERN Document Server

    Nakagawa, Toshio

    2014-01-01

    Exploring random maintenance models, this book provides an introduction to the implementation of random maintenance, and it is one of the first books to be written on this subject.  It aims to help readers learn new techniques for applying random policies to actual reliability models, and it provides new theoretical analyses of various models including classical replacement, preventive maintenance and inspection policies. These policies are applied to scheduling problems, backup policies of database systems, maintenance policies of cumulative damage models, and reliability of random redundant systems. Reliability theory is a major concern for engineers and managers, and in light of Japan’s recent earthquake, the reliability of large-scale systems has increased in importance. This also highlights the need for a new notion of maintenance and reliability theory, and how this can practically be applied to systems. Providing an essential guide for engineers and managers specializing in reliability maintenance a...

  12. Optimal scheduling of aircrafts’ engines repair process

    OpenAIRE

    Cerdeira, Jorge Orestes; Lopes,Isabel Cristina; Silva, Eliana Costa e

    2013-01-01

    We address a real world scheduling problem concerning the repair process of aircrafts’ engines by TAP - Maintenance & Engineering (TAP-ME). TAP-ME is the maintenance, repair and overhaul organization of TAP Portugal, Portugal’s leading airline, which employs about 4000 persons to provide maintenance and engineering services in aircraft, engines and components. TAP-ME is aiming to optimize its maintenance services, focusing on the reduction of the engines repair turnaround time....

  13. design of preventive maintenance scheduling model for ...

    African Journals Online (AJOL)

    The Weibull failure distribution and negative exponential distribution shall be adopted for this paper. The choice of the two failure dis- tributions was informed by the fact that most deteriorating systems exhibit decreasing, con- stant and increasing failure rates at various stages of their service life. The distribution parameters ...

  14. Modern Method for Preventive Maintenance

    Science.gov (United States)

    Wilson, Howard D.

    1974-01-01

    Describes a system at Michigan State University that comprises 16 separate programs and schedules 25,000 manhours of preventive maintenance. With information about preventive maintenance for over 100,000 units stored in its computer, the university saves personnel, time, and energy. (Author/MLF)

  15. A Real-Time Quantitative Condition Alerting and Analysis Support System for Aircraft Maintenance Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Financial constraints and the need for improved operational efficiency are requiring airlines to emphasize "on-condition" maintenance over scheduled maintenance...

  16. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  17. 41 CFR 101-39.303 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Maintenance. 101-39.303... Maintenance. In order to ensure uninterrupted operation of GSA Interagency Fleet Management System (IFMS) vehicles, safety and preventive maintenance inspections will be performed at regularly scheduled intervals...

  18. A COMPUTER BASED MAINTENANCE MANAGEMENT SYSTEM ...

    African Journals Online (AJOL)

    The development of a computer based maintenance management system is presented for industries using optimization models. The system which is capable of using optimization data and programs to schedule for maintenance or replacement of machines has been designed such that it enables the maintenance ...

  19. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    led several cost research initiatives in cloud computing, service-oriented architecture , and agile development and various independent schedule...systems and platforms. Manring is trained and experienced on a number of commercial parametric software cost models and risk analysis tools. She has...and he supports DoD and federal acquisition efforts with a focus on rapid and agile practices to speed solutions with the lowest practical program

  20. Online Scheduling

    OpenAIRE

    Sgall, Jiri

    2005-01-01

    We survey some recent results on scheduling unit jobs. The emphasis of the talk is both on presenting some basic techniques and providing an overview of the current state of the art. The techniques presented cover charging schemes, potential function arguments, and lower bounds based on Yao's principle. The studied problem is equivalent to the following buffer management problem: packets with specified weights and deadlines arrive at a network switch and need to be forwarded so that the total...

  1. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    Science.gov (United States)

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  2. Setting Up a Preventive Maintenance Program: Part 2.

    Science.gov (United States)

    Dwyer, Michael J., Jr.

    1980-01-01

    Outlines how a good preventive maintenance program can be scheduled and followed up to insure that the inspections have been performed. Both manually operated and computerized preventive maintenance programs are discussed. (MLF)

  3. Using Integer Programming for Airport Service Planning in Staff Scheduling

    Directory of Open Access Journals (Sweden)

    W.H. Ip

    2010-09-01

    Full Text Available Reliability and safety in flight is extremely necessary and that depend on the adoption of proper maintenance system. Therefore, it is essential for aircraft maintenance companies to perform the manpower scheduling efficiently. One of the objectives of this paper is to provide an Integer Programming approach to determine the optimal solutions to aircraft maintenance planning and scheduling and hence the planning and scheduling processes can become more efficient and effective. Another objective is to develop a set of computational schedules for maintenance manpower to cover all scheduled flights. In this paper, a sequential methodology consisting of 3 stages is proposed. They are initial maintenance demand schedule, the maintenance pairing and the maintenance group(s assignment. Since scheduling would split up into different stages, different mathematical techniques have been adopted to cater for their own problem characteristics. Microsoft Excel would be used. Results from the first stage and second stage would be inputted into integer programming model using Microsoft Excel Solver to find the optimal solution. Also, Microsoft Excel VBA is used for devising a scheduling system in order to reduce the manual process and provide a user friendly interface. For the results, all can be obtained optimal solution and the computation time is reasonable and acceptable. Besides, the comparison of the peak time and non-peak time is discussed.

  4. A production model and maintenance planning model for the process industry

    NARCIS (Netherlands)

    Ashayeri, J.; Teelen, A.; Selen, W.J.

    1995-01-01

    In this paper a model is developed to simultaneously plan preventive maintenance and production in a process industry environment, where maintenance planning is extremely important. The model schedules production jobs and preventive maintenance jobs, while minimizing costs associated with

  5. Roadside maintenance

    Science.gov (United States)

    2010-01-01

    Roadside Maintenance is a unique element within the highway maintenance program because much of the work involves caring for and/or controlling vegetation. Roadside vegetation, if managed properly, can become more naturally self-sustaining over time ...

  6. Preventive Maintenance in Oakland--An Update.

    Science.gov (United States)

    Howard, David R.; Mears, Joe N.

    1981-01-01

    The preventive maintenance program for Oakland (California) public schools has full-time traveling teams of carpenters, painters, and a plumber, augmented by electricians and glaziers. Scheduled visits are made to every site twice a year. (Author/MLF)

  7. 21 CFR 211.67 - Equipment cleaning and maintenance.

    Science.gov (United States)

    2010-04-01

    ...) Maintenance and cleaning schedules, including, where appropriate, sanitizing schedules; (3) A description in sufficient detail of the methods, equipment, and materials used in cleaning and maintenance operations, and the methods of disassembling and reassembling equipment as necessary to assure proper cleaning and...

  8. Setting Up a Preventive Maintenance Program.

    Science.gov (United States)

    Dwyer, Michael J., Jr.

    1980-01-01

    The steps of a preventive maintenance program are to determine what equipment will fall within the program; to determine what tasks are necessary to perform the required maintenance, and the frequency of each task; and to build a workable schedule. (Author/MLF)

  9. Acquisition, maintenance and reinstatement of intravenous cocaine self-administration under a second-order schedule of reinforcement in rats: effects of conditioned cues and continuous access to cocaine.

    Science.gov (United States)

    Arroyo, M; Markou, A; Robbins, T W; Everitt, B J

    1998-12-01

    Second order schedules of IV cocaine reinforcement in rats provide a reliable method for evaluating the effects of conditioned stimuli on cocaine-seeking behaviour, and for measuring the motivational aspects of cocaine reinforcement. In the procedure established here, each infusion of cocaine (0.25 mg/infusion) was initially made contingent on a lever press and was paired with a 20-s light conditioned stimulus (CS). When rats acquired stable rates of cocaine self-administration, the response requirement for cocaine was increased progressively to a second-order schedule of the type FI15 min(FR10:S), whereby the IV cocaine infusion was self-administered following the completion of the first FR10 responses (and CS presentation) after a 15-min fixed interval (FI) had elapsed. Evaluation of the animals' responding during the first, drug-free interval of each daily session provided a measure of cocaine-seeking behaviour, independent of other pharmacological effects of the self-administered drug. Thus, a dose-response study (dose range: 0.083, 0.25 and 0.50 mg/infusion) revealed that responding under this schedule during the initial, drug-free interval changed monotonically with dose, whereas an inverse relationship between cocaine dose and response level tended to appear during the rest of the session, after rats had self-administered the drug. Responding under this schedule was also shown to occur under the control of the CS, which had acquired conditioned reinforcing properties. Thus, a decrease in responding and an increase in the latency to initiate responding followed the omission of the CS for 3 consecutive days. In addition, extinction of cocaine-seeking behaviour was slower when contingent CS presentations occurred compared to extinction when the CS was not present. Furthermore, the reinstatement of responding for cocaine, which followed a brief period of non-contingent CS presentations, was retarded when this conditioned reinforcer had been extinguished together

  10. Maintenance Budgeting.

    Science.gov (United States)

    Smith, J. McCree

    Three methods for the preparation of maintenance budgets are discussed--(1) a traditional method, inconclusive and obsolete, based on gross square footage, (2) the formula approach method based on building classification (wood-frame, masonry-wood, masonry-concrete) with maintenance cost factors for each type plus custodial service rates by type of…

  11. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  12. Records Control Schedules Repository

    Data.gov (United States)

    National Archives and Records Administration — The Records Control Schedules (RCS) repository provides access to scanned versions of records schedules, or Standard Form 115, Request for Records Disposition...

  13. 76 FR 58510 - Notice of Meeting Schedule for 2012

    Science.gov (United States)

    2011-09-21

    .... --Property, Plant and Equipment. --Natural Resources. --Deferred Maintenance/Asset Impairment. --Technical... From the Federal Register Online via the Government Publishing Office FEDERAL ACCOUNTING STANDARDS ADVISORY BOARD Notice of Meeting Schedule for 2012 AGENCY: Federal Accounting Standards Advisory Board...

  14. 75 FR 20364 - Notice of Meeting Schedule for 2011

    Science.gov (United States)

    2010-04-19

    ... --Property, Plant and Equipment --Natural Resources --Deferred Maintenance/Asset Impairment --Technical... From the Federal Register Online via the Government Publishing Office FEDERAL ACCOUNTING STANDARDS ADVISORY BOARD Notice of Meeting Schedule for 2011 AGENCY: Federal Accounting Standards Advisory Board...

  15. A review of planning models for maintenance and production.

    NARCIS (Netherlands)

    G. Budai-Balke (Gabriella); R. Dekker (Rommert); R.P. Nicolai (Robin)

    2006-01-01

    textabstractIn this article we give an overview of the relation between planning of maintenance and production. On the one hand we consider production planning and scheduling models in which failures and maintenance aspects are taken into account. Next we discuss the planning of maintenance

  16. Maintenance routing for train units: the scenario model

    NARCIS (Netherlands)

    G. Maróti (Gábor); L.G. Kroon

    2004-01-01

    textabstractTrain units need regular preventive maintenance. Given the train units that require maintenance in the forthcoming 1--3 days, the rolling stock schedule must be adjusted so that these urgent units reach the maintenance facility in time. We present an integer programming model for this

  17. Periodontal maintenance

    National Research Council Canada - National Science Library

    Tan, A E S

    2009-01-01

    ...") phase of periodontal treatment. This concept of ongoing periodontal maintenance therapy has been embraced as the mandatory requirement for favourable periodontal outcomes based on institutional clinical trials and in practice-based...

  18. Monitoring Building Systems for Schedule Compliance

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, Andrew M.; Belew, Shan T.

    2013-02-19

    As Pacific Northwest National Laboratory (PNNL) initiated a Core Business Hours program, it became a challenge to ensure that the hundreds of systems campus wide were operating within their programmed schedules. Therefore, a collaborative exchange between PNNL operations and PNNL researchers developing the Decision Support for Operations and Maintenance (DSOM) software package was initiated to create a tool to solve this problem. This new DSOM tool verifies systems are operating within scheduled operation times by polling Building Automation and Control Network (BACnet) identifiers of systems’ on/off or command statuses. The tool records the time spent in operation state (ON) and totalizes each system over a rolling 7-day period, highlighting systems that are running over the scheduled hours. This snapshot view allows building management to look quickly at the entire campus to ensure that systems are not operating beyond their scheduled hours.

  19. Maintenance Therapy in IBD

    Science.gov (United States)

    ... Help Center Home > Resources > Maintenance Therapy Go Back Maintenance Therapy Email Print + Share The term "maintenance therapy" ... are referred to as "maintenance therapies." Why is Maintenance Therapy Needed in IBD? Both Crohn's disease and ...

  20. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedules for Adults in Easy-to-read Formats ... previous immunizations. View or Print a Schedule Recommended Immunizations for Adults (19 Years and Older) by Age ...

  1. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  2. Class Schedules Need Class.

    Science.gov (United States)

    Monfette, Ronald J.

    1986-01-01

    Argues that college publications, including class schedules, must be accurate, timely, and easy to read and follow. Describes Schoolcraft College's unified format approach to publications marketing. Offers suggestions on the design, format, and distribution of class schedules. (DMM)

  3. Reliability Analysis of Car Maintenance Forecast and Performance

    OpenAIRE

    Owhor, Sampson Chisa; Abdul Alim Ibrahim Gambo; Ojo, Victor Kayode; Dan’azumi Daniel

    2015-01-01

    In reliability analysis of car maintenance forecast and performance, researchers have mostly dealt with problems either without maintenance or with deterministic maintenance when no failure can occur. This can be unrealistic in practical settings. In this work, a statistical model is developed to evaluate the effect of predictive and preventive maintenance schemes on car performance in the presence of system failure where the forecasting objective is to minimize schedule duration. It was s...

  4. Rotating Workforce Scheduling

    OpenAIRE

    Granfeldt, Caroline

    2015-01-01

    Several industries use what is called rotating workforce scheduling. This often means that employees are needed around the clock seven days a week, and that they have a schedule which repeats itself after some weeks. This thesis gives an introduction to this kind of scheduling and presents a review of previous work done in the field. Two different optimization models for rotating workforce scheduling are formulated and compared, and some examples are created to demonstrate how the addition of...

  5. Language Maintenance.

    Science.gov (United States)

    National Inst. of Education (DHEW), Washington, DC. Educational Equity Group. Multicultural/Bilingual Div.

    This annotated bibliography which includes all entries into the ERIC system dealing with language maintenance was compiled to show the type of information available to users of the system. The citations deal principally with bilingualism and bilingual education in the United States, Canada, Israel, Ireland, the Pacific islands and Southeast Asia.…

  6. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  7. Periodontal maintenance.

    Science.gov (United States)

    Tan, A E S

    2009-09-01

    The main goal of periodontal therapy is to establish an oral environment compatible with periodontal health by the physical disruption of the plaque biofilm and adjunctive chemical means if required. Implicit in this objective is the ongoing requirement of detection and interception of new and recurrent disease, which continues at selected intervals for the life of the dentition after the initial ("active") phase of periodontal treatment. This concept of ongoing periodontal maintenance therapy has been embraced as the mandatory requirement for favourable periodontal outcomes based on institutional clinical trials and in practice-based studies in various parts of the world. This review examines the ramifications of periodontal maintenance therapy based upon a multi-level assessment of logistic issues and risk factors at three levels: (1) The patient level - treatment time; patient attendance compliance; and homecare measures, antiseptics/antibiotics and smoking. (2) The level of the individual tooth - tooth loss; and evaluation of success versus survival. (3) The level of each tooth surface ("site") - probing depth, loss of attachment and bleeding on probing; and changes in clinical attachment levels. In spite of the diversity of studies conducted, there is agreement on the efficacy of periodontal maintenance therapy when compared with studies on untreated populations and in treated cases that were not maintained.

  8. Fleet management: maintenance information systems for small operations

    Energy Technology Data Exchange (ETDEWEB)

    Tomlingson, D.

    2004-03-01

    The article gives advice on overcoming expense and implementation concerns in small coal mining operations. It describes how to set up a preventative maintenance program, and discusses planning and scheduling of work. 1 fig.

  9. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas, Edouard; Levrat, Eric; Iung, Benoît; Cocheteux, Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  10. Combinatory CPU Scheduling Algorithm

    OpenAIRE

    Saeeda Bibi; Farooque Azam; Yasir Chaudhry

    2010-01-01

    Central Processing Unit (CPU) plays a significant role in computer system by transferring its control among different processes. As CPU is a central component, hence it must be used efficiently. Operating system performs an essential task that is known as CPU scheduling for efficient utilization of CPU. CPU scheduling has strong effect on resource utilization as well as overall performance of the system. In this paper, a new CPU scheduling algorithm called Combinatory is proposed that combine...

  11. Planning and control of maintenance systems modelling and analysis

    CERN Document Server

    Duffuaa, Salih O

    2015-01-01

    Analyzing maintenance as an integrated system with objectives, strategies and processes that need to be planned, designed, engineered, and controlled using statistical and optimization techniques, the theme of this book is the strategic holistic system approach for maintenance. This approach enables maintenance decision makers to view maintenance as a provider of a competitive edge not a necessary evil. Encompassing maintenance systems; maintenance strategic and capacity planning, planned and preventive maintenance, work measurements and standards, material (spares) control, maintenance operations and control, planning and scheduling, maintenance quality, training, and others, this book gives readers an understanding of the relevant methodology and how to apply it to real-world problems in industry. Each chapter includes a number exercises and is suitable as a textbook or a reference for a professionals and practitioners whilst being of interest to industrial engineering, mechanical engineering, electrical en...

  12. Charlo Class Scheduling Plan.

    Science.gov (United States)

    Fiebiger, Leo J.

    The design and implementation of a rotating class schedule which was put into effect in the Charlo High School, Charlo, Montana in September 1969 is discussed in this paper. The schedule, described in this report, consists of a 75-minute period followed by 2, 60-minute periods in the morning and 4, 45-minute afternoon periods. The program…

  13. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  14. A production model and maintenance planning model for the process industry

    OpenAIRE

    Ashayeri, J.; Teelen, A.; Selen, W.J.

    1995-01-01

    In this paper a model is developed to simultaneously plan preventive maintenance and production in a process industry environment, where maintenance planning is extremely important. The model schedules production jobs and preventive maintenance jobs, while minimizing costs associated with production, backorders, corrective maintenance and preventive maintenance. The formulation of the model is flexible, so that it can be adapted to several production situations. The performance of the model i...

  15. Effects of Block Scheduling

    Directory of Open Access Journals (Sweden)

    William R. Veal

    1999-09-01

    Full Text Available This study examined the effects of a tri-schedule on the academic achievement of students in a high school. The tri-schedule consists of traditional, 4x4 block, and hybrid schedules running at the same time in the same high school. Effectiveness of the schedules was determined from the state mandated test of basic skills in reading, language, and mathematics. Students who were in a particular schedule their freshman year were tested at the beginning of their sophomore year. A statistical ANCOVA test was performed using the schedule types as independent variables and cognitive skill index and GPA as covariates. For reading and language, there was no statistically significant difference in test results. There was a statistical difference mathematics-computation. Block mathematics is an ideal format for obtaining more credits in mathematics, but the block format does little for mathematics achievement and conceptual understanding. The results have content specific implications for schools, administrations, and school boards who are considering block scheduling adoption.

  16. F-106 Scheduled Maintenance Study. User’s Manual,

    Science.gov (United States)

    1972-09-01

    TO HIST-TlTLE-1. 99030 MOVt HliT-NO-IF-OBS TO HIST-ERR-2. 9OUD0 HHITF HIST-HE^ FROM HIiT -TlTLE. 99050 MOVt III TO HISf-FLAO, 99U60...OCCURANCE INTO APPROPRIATE CHANNEL. 97bl0 MOVt 2L*0 TO HIST-INDEX-2. 97620 HIST-OCCUHANCf. 97b30 ADD 1 TO hIST-INDEX-2, 976*0 MOVt HIiT . VALUE t...WRITE HIST-REC FROM HIST-TITLE. C96970 MOVE IIS T3 HIST-FLAG. C98970 GO TO ENO-HIST. C98970 HIST-ERKOH-4. C98970 MOVt HIiT -ERR-i» TO HIST-TITLE-1

  17. Scheduling for production teams

    Directory of Open Access Journals (Sweden)

    Yuri Mauergauz

    2015-09-01

    Full Text Available This paper presents a method of calendar (weekly scheduling for production teams, when the average orders utility function is used as the quality criterion. The method is based on the concept of “production intensity”, which is a dynamic parameter of production process. Applied software package allows scheduling for medium quantity of jobs. The result of software application is the team load on the planning horizon. The computed schedule may be corrected and recalculated in interactive mode. Current load of every team is taken into account at each recalculation. The method may be used for any combination of complex and specialized teams.

  18. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features....... By comparing EPS to classical schedules, EPS simulation provides more accurate results with regards to project goals. These instructions give you guidelines for preparing papers for Journal of Software (JSW). Use this document as a template if you are using Microsoft Word 6.0 or later. Otherwise, use...

  19. Reliability centered maintenance in astronomical infrastructure facilities

    Science.gov (United States)

    Ansorge, W. R.

    2006-06-01

    Hundreds of mirror segment, thousands of high precision actuators, highly complex mechanical, hydraulic, electrical and other technology subsystems, and highly sophisticated control systems: an ELT system consists of millions of individual parts and components, each of them may fail and lead to a partial or complete system breakdown. The traditional maintenance concepts characterized by predefined preventive maintenance activities and rigid schedules are not suitable for handling this large number of potential failures and malfunctions and the extreme maintenance workload. New maintenance strategies have to be found suitable to increase reliability while reducing the cost of needless maintenance services. The Reliability Centred Maintenance (RCM) methodology is already used extensively by airlines, and in industrial and marine facilities and even by scientific institutions like NASA. Its application increases the operational reliability while reducing the cost of unnecessary maintenance activities and is certainly also a solution for current and future ELT facilities. RCM is a concept of developing a maintenance scheme based on the reliability of the various components of a system by using "feedback loops between instrument / system performance monitoring and preventive/corrective maintenance cycles." Ideally RCM has to be designed within a system and should be located in the requirement definition, the preliminary and final design phases of new equipment and complicated systems. However, under certain conditions, an implementation of RCM into the maintenance management strategy of already existing astronomical infrastructure facilities is also possible. This presentation outlines the principles of the RCM methodology, explains the advantages, and highlights necessary changes in the observatory development, operation and maintenance philosophies. Presently, it is the right time to implement RCM into current and future ELT projects and to save up to 50% maintenance

  20. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  1. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  2. Childhood Vaccine Schedule

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues Childhood Vaccine Schedule Past Issues / Spring 2008 Table of Contents ... please turn Javascript on. When to Vaccinate What Vaccine Why Birth (or any age if not previously ...

  3. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  4. CERN confirms LHC schedule

    CERN Multimedia

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  5. Registration Review Schedules

    Science.gov (United States)

    This schedule indicates plans for completion of risk assessments, proposed interim decisions and interim decisions for pesticides in the Registration Review program, EPA reviews all registered pesticides at least every 15 years as required by FIFRA.

  6. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  7. Probabilistic Bisimulation for Realistic Schedulers

    DEFF Research Database (Denmark)

    Eisentraut, Christian; Godskesen, Jens Christian; Hermanns, Holger

    2015-01-01

    . This holds in the classical context of arbitrary schedulers, but it has been argued that this class of schedulers is unrealistically powerful. This paper studies a strictly coarser notion of bisimilarity, which still enjoys these properties in the context of realistic subclasses of schedulers: Trace...... distribution equivalence is implied for partial information schedulers, and compositionality is preserved by distributed schedulers. The intersection of the two scheduler classes thus spans a coarser and still reasonable compositional theory of behavioral semantics....

  8. Introduction to Scheduling

    CERN Document Server

    Robert, Yves

    2009-01-01

    Reviewing classical methods, realistic models, and algorithms, this book offers a through introduction to scheduling. Coverage includes fundamental concepts and basic methods, recent research, and applications with a special focus on distributed systems and computational grids. Other topics include online scheduling, stochastic task-resource systems, and platform models. Examples, theorems, and pedagogical proofs create an interactive learning format. Though rigorous, the book provides enough background to be self-contained and fully accessible to computer scientists, mathematicians, and resea

  9. PAR Loop Schedule Review

    Energy Technology Data Exchange (ETDEWEB)

    Schaffer, Jr.; W.F.

    1958-04-30

    The schedule for the installation of the PAR slurry loop experiment in the South Facility of the ORR has been reviewed and revised. The design, fabrications and Installation is approximately two weeks behind schedule at this time due to many factors; however, indications are that this time can be made up. Design is estimated to be 75% complete, fabrication 32% complete and installation 12% complete.

  10. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  11. Maintenance Management Update.

    Science.gov (United States)

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  12. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  13. Clustering condition-based maintenance for a multi-unit system with aperiodic inspections

    NARCIS (Netherlands)

    Olde Keizer, Minou C.A.; Teunter, Ruud H.; Podofillini, Luca; Sudret, Bruno; Stojadinović, Božidar; Zio, Enrico; Kröger, Wolfgang

    2015-01-01

    Condition-Based Maintenance (CBM) is a predictive maintenance strategy, which bases the maintenance scheduling on condition measurements of the components. In this paper, we continue work on the CBM optimization approach proposed by Castanier, B., A. Grall & C. Bérenguer (2005). A condition-based

  14. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  15. On the computational complexity of (maximum) class scheduling

    NARCIS (Netherlands)

    L.G. Kroon (Leo); A.W.J. Kolen

    1991-01-01

    textabstractIn this paper we consider several generalizations of the Fixed Job Scheduling Problem (FSP) which appear in a natural way in the aircraft maintenance process at an airport: A number of jobs have to be carried out, where the main attributes of a job are: a fixed start time, a fixed finish

  16. On the computational complexity of (maximum) shift class scheduling

    NARCIS (Netherlands)

    L.G. Kroon (Leo); A.W.J. Kolen

    1993-01-01

    textabstractIn this paper we consider a generalization of the Fixed Job Scheduling Problem (FSP) which appears in a natural way in the aircraft maintenance process at an airport. A number of jobs has to be carried out, where the main attributes of a job are: a fixed start time, a fixed finish time

  17. Routing and scheduling problems

    DEFF Research Database (Denmark)

    Reinhardt, Line Blander

    of a connection between two locations. This could be an urban bus schedule where busses are routed and this routing creates a bus schedule which the passengers between locations use. In this thesis various routing and scheduling problems will be presented. The topics covered will be routing from an origin...... set cost making the cost of the individual vehicle routes inter-dependant. Depending on the problem type, the size of the problems and time available for solving, different solution methods can be applicable. In this thesis both heuristic methods and several exact methods are investigated depending...... on the problems needed to be solved. The solution methods applied to the problems cover dynamic programming for multi constrained shortest paths, Branch-and-cut for liner shipping, Simulated annealing for transporting assisted passengers in airports, branch-cut-and-price for vehicle routing with time windows...

  18. CONTEXT DRIVEN MAINTENANCE: AN eMAINTENANCE APPROACH

    Directory of Open Access Journals (Sweden)

    Diego GALAR

    2014-07-01

    Full Text Available All assets necessarily suffer wear and tear during operation. Prognostics can assess the current health of a system and predict its remaining life based on features capturing the gradual degradation of its operational capabilities. Prognostics are critical to improve safety, plan successful work, schedule maintenance, and reduce maintenance costs and down time. Prognosis is a relatively new area but has become an important part of Condition‐based Maintenance (CBM of systems. As there are many prognostic techniques, usage must be attuned to particular applications. Broadly stated, prognostic methods are either data‐driven, rule based, or model‐based. Each approach has advantages and disadvantages; consequently, they are often combined in hybrid applications. A hybrid model can combine some or all model types; thus, more complete information can be gathered, leading to more accurate recognition of the fault state. This approach is especially relevant in systems where the maintainer and operator know some of the failure mechanisms, but the sheer complexity of the assets precludes the development of a complete model‐based approach. The paper addresses the process of data aggregation into a contextual awareness hybrid model to get RUL values within logical confidence intervals so that the life cycle of assets can be managed and optimised.

  19. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  20. Intelligent retail logistics scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, J.; Jewers, K. [Stamford House, London (United Kingdom); Codd, A.; Alcock, A. [Inference Corp., Slough, Berkshire (United Kingdom)

    1996-12-31

    The Supply Chain Integrated Ordering Network (SCION) Depot Bookings system automates the planning and scheduling of perishable and non-perishable commodities and the vehicles that carry them into J. Sainsbury depots. This is a strategic initiative, enabling the business to make the key move from weekly to daily ordering. The system is mission critical, managing the inwards flow of commodities from suppliers into J. Sainsbury`s depots. The system leverages Al techniques to provide a business solution that meets challenging functional and performance needs. The SCION Depot Bookings system is operational providing schedules for 22 depots across the UK.

  1. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  2. A Situational Maintenance Model

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance.......An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance....

  3. Range and mission scheduling automation using combined AI and operations research techniques

    Science.gov (United States)

    Arbabi, Mansur; Pfeifer, Michael

    1987-01-01

    Ground-based systems for Satellite Command, Control, and Communications (C3) operations require a method for planning, scheduling and assigning the range resources such as: antenna systems scattered around the world, communications systems, and personnel. The method must accommodate user priorities, last minute changes, maintenance requirements, and exceptions from nominal requirements. Described are computer programs which solve 24 hour scheduling problems, using heuristic algorithms and a real time interactive scheduling process.

  4. CMS multicore scheduling strategy

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Calero Yzquierdo, Antonio [Madrid, CIEMAT; Hernandez, Jose [Madrid, CIEMAT; Holzman, Burt [Fermilab; Majewski, Krista [Fermilab; McCrea, Alison [UC, San Diego

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  5. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  6. Iterative robust multiprocessor scheduling

    NARCIS (Netherlands)

    Adyanthaya, S.; Geilen, M.; Basten, T.; Voeten, J.; Schiffelers, R.

    2015-01-01

    General purpose platforms are characterized by unpredictable timing behavior. Real-time schedules of tasks on general purpose platforms need to be robust against variations in task execution times. We define robustness in terms of the expected number of tasks that miss deadlines. We present an

  7. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    Typically, ground staff scheduling is centrally planned for each terminal in an airport. The advantage of this is that the staff is efficiently utilized, but a disadvantage is that staff spends considerable time walking between stands. In this paper a decentralized approach for ground staff...

  8. Azithromycin maintenance therapy in patients with cystic fibrosis : A dose advice based on a review of pharmacokinetics, efficacy, and side effects

    NARCIS (Netherlands)

    Wilms, Erik B.; Touw, Daniel J.; Heijerman, Harry G.M.; Van Der Ent, Cornelis K.

    Azithromycin maintenance therapy results in improvement of respiratory function in patients with cystic fibrosis (CF). In azithromycin maintenance therapy, several dosing schemes are applied. In this review, we combine current knowledge about azithromycin pharmacokinetics with the dosing schedules

  9. DPS - Dynamic Parallel Schedules

    OpenAIRE

    IEEE Press; Gerlach, S.; Hersch, R. D.

    2003-01-01

    Dynamic Parallel Schedules (DPS) is a high-level framework for developing parallel applications on distributed memory computers (e.g. clusters of PC). Its model relies on compositional customizable split-compute-merge graphs of operations (directed acyclic flow graphs). The graphs and the mapping of operations to processing nodes are specified dynamically at runtime. DPS applications are pipelined and multithreaded by construction, ensuring a maximal overlap of computations and communications...

  10. Flight control electronics reliability/maintenance study

    Science.gov (United States)

    Dade, W. W.; Edwards, R. H.; Katt, G. T.; Mcclellan, K. L.; Shomber, H. A.

    1977-01-01

    Collection and analysis of data are reported that concern the reliability and maintenance experience of flight control system electronics currently in use on passenger carrying jet aircraft. Two airlines B-747 airplane fleets were analyzed to assess the component reliability, system functional reliability, and achieved availability of the CAT II configuration flight control system. Also assessed were the costs generated by this system in the categories of spare equipment, schedule irregularity, and line and shop maintenance. The results indicate that although there is a marked difference in the geographic location and route pattern between the airlines studied, there is a close similarity in the reliability and the maintenance costs associated with the flight control electronics.

  11. JRR-3 maintenance program utilizing accumulated operation data

    Energy Technology Data Exchange (ETDEWEB)

    Izumo, H.; Kato, T.; Kinase, M.; Torii, Y.; Murayama, Y. [Tokai Research and Development Center, Nuclear Science Research Institute, Japan Atomic Energy Agency, Dept. of Research Reactor and Tandem Accelerator, Tokai-mura, Naka-gun, Ibaraki-ken (Japan)

    2007-07-01

    JRR-3 (Japan Research Reactor No.3) has been operated for more than 15 years after undergoing major modification, without significant troubles by carrying out maintenance such as the preventive maintenance (PM) (mainly time based maintenance) for the safety-grade equipment and the breakdown maintenance (BM) for the non-safety-grade equipment. PM is the maintenance whose aim is to keep the function of an equipment, which includes the time based preventive maintenance (TBM) and the condition-based preventive maintenance (CBM). TBM is the one to carry out replacement and inspection on a planned schedule. TBM is subdivided into the periodic maintenance (PEM) and the age-based maintenance (AM). PEM is the maintenance at regular intervals while AM is the one on planned operation time. CBM is made of 2 steps, the first step consists of the observation, continuously or intermittently of the condition of an equipment and the second step is the repair or replacement work whose planning is based on the observation results. Unscheduled shutdowns caused by aged non-safety-grade equipment have been increasing, and the resources have been decreasing year by year. By optimizing TBM and adopting CBM for non-safety-grade equipment, reliability and condition of the equipment will be better. Furthermore future data accumulated by this shift in maintenance policy would be useful to JRR-3 safety operation through the setting up of performance indicators.

  12. Condition Based Maintenance

    National Research Council Canada - National Science Library

    Rabeno, Eric

    2008-01-01

    CONDITION BASED MAINTENANCE (CBM): A plan of maintenance for a system based not upon time intervals but rather upon the actual condition of the system as enabled by the application of usage, diagnostic, and prognostic processes...

  13. Movable bridge maintenance monitoring.

    Science.gov (United States)

    2013-10-01

    Movable bridges have particular maintenance issues, which cost considerably more than those of fixed bridges, : mostly because of the complex interaction of the mechanical, electrical and structural components. In order to track : maintenance and ope...

  14. Winter maintenance performance measure.

    Science.gov (United States)

    2016-01-01

    The Winter Performance Index is a method of quantifying winter storm events and the DOTs response to them. : It is a valuable tool for evaluating the States maintenance practices, performing post-storm analysis, training : maintenance personnel...

  15. Darlington Station outage - a maintenance perspective

    Energy Technology Data Exchange (ETDEWEB)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K. [Ontario Hydro, Darlington Nuclear Generating Station, Bowmanville, ON (Canada)

    1997-07-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  16. Asphalt in Pavement Maintenance.

    Science.gov (United States)

    Asphalt Inst., College Park, MD.

    Maintenance methods that can be used equally well in all regions of the country have been developed for the use of asphalt in pavement maintenance. Specific information covering methods, equipment and terminology that applies to the use of asphalt in the maintenance of all types of pavement structures, including shoulders, is provided. In many…

  17. Intelligent Maintenance Aid (IMA)

    Science.gov (United States)

    2006-06-01

    22 2. Use Case 2: Run Test .........................................................................23...and vehicle system) to the IMA system (Craig Larman 1997). Maintenance Operator IMA System Log In Run Test Capture and Display TP Vehicle System... Test Use case: Run Test Actors: Maintenance Operator (initiators) Purpose: To perform Vehicle System BIT and FIT tests. Overview: Maintenance

  18. Light Vehicle Preventive Maintenance.

    Science.gov (United States)

    Marine Corps Inst., Washington, DC.

    This correspondence course, originally developed for the Marine Corps, is designed to instruct students in the performance of preventive maintenance on motor vehicles. Instructional materials are presented in three chapters as follows: (1) Major Maintenance Areas (maintenance system, tires, batteries, cooling systems, and vehicle lubrication; (2)…

  19. Smart-IPM: An Adaptive Tool for the Preventive Maintenance of Medical Equipment

    National Research Council Canada - National Science Library

    Arslan, R

    2001-01-01

    .... Scheduled inspections help ensure the safety and efficacy of the medical equipment. In this study, a software tool is developed to implement a risk oriented prioritization of devices for preventive maintenance inspections...

  20. Visualization and Simulation in Scheduling

    Directory of Open Access Journals (Sweden)

    R. Čapek

    2008-01-01

    Full Text Available This paper deals with the representation of scheduling results and it introduces a new tool for visualization and simulation in time scheduling called VISIS. The purpose of this tool is to provide an environment for visualization, e.g. in production line scheduling. The simulation also proposes a way to simulate the influence of a schedule on a user defined system, e.g. for designing filters in digital signal processing. VISIS arises from representing scheduling results using the well-known Gantt chart. The application is implemented in the Matlab programming environment using Simulink and the Virtual Reality toolbox. 

  1. 40 CFR 63.9525 - What are the installation, operation, and maintenance requirements for my weight measurement device?

    Science.gov (United States)

    2010-07-01

    ... device will be maintained, including a routine maintenance schedule and spare parts inventory list. (c..., and maintenance requirements for my weight measurement device? 63.9525 Section 63.9525 Protection of... Requirements § 63.9525 What are the installation, operation, and maintenance requirements for my weight...

  2. 40 CFR 63.9632 - What are the installation, operation, and maintenance requirements for my monitoring equipment?

    Science.gov (United States)

    2010-07-01

    ... including a routine maintenance schedule and spare parts inventory list. (v) How the bag leak detection..., and maintenance requirements for my monitoring equipment? 63.9632 Section 63.9632 Protection of... the installation, operation, and maintenance requirements for my monitoring equipment? (a) For each...

  3. AIRCRAFT MAINTENANCE HANGAR

    Directory of Open Access Journals (Sweden)

    GEAMBASU Gabriel George

    2017-05-01

    Full Text Available The paper presents the maintenance process that is done on an airplane, at a certain period of time, or after a number of flight hours or cycles and describes the checks performed behind each inspection. The first part of research describes the aircraft maintenance process that has to be done after an updated maintenance manual according with aircraft type, followed by a short introduction about maintenance hangar. The second part of the paper presents a hangar design with a foldable roof and walls, which can be folded or extended, over an airplane when a maintenance process is done, or depending on weather condition.

  4. Modern electronic maintenance principles

    CERN Document Server

    Garland, DJ

    2013-01-01

    Modern Electronic Maintenance Principles reviews the principles of maintaining modern, complex electronic equipment, with emphasis on preventive and corrective maintenance. Unfamiliar subjects such as the half-split method of fault location, functional diagrams, and fault finding guides are explained. This book consists of 12 chapters and begins by stressing the need for maintenance principles and discussing the problem of complexity as well as the requirements for a maintenance technician. The next chapter deals with the connection between reliability and maintenance and defines the terms fai

  5. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  6. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    The coordination of activities and resources in order to establish an effective production flow is central to the management of construction projects. The traditional technique for coordination of activities and resources in construction projects is the CPM-scheduling, which has been...... on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...

  7. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  8. Innovation for maintenance technology improvements

    Science.gov (United States)

    Shives, T. R. (Editor); Willard, W. A. (Editor)

    1982-01-01

    A group of 34 submitted entries (32 papers and 2 abstracts) from the 33rd meeting of the Mechanical Failures Prevention Group whose subject was maintenance technology improvement through innovation. Areas of special emphasis included maintenance concepts, maintenance analysis systems, improved maintenance processes, innovative maintenance diagnostics and maintenance indicators, and technology improvements for power plant applications.

  9. 24 CFR 904.111 - Nonroutine Maintenance Reserve (NRMR).

    Science.gov (United States)

    2010-04-01

    ... (see paragraph (b) of this section). Such maintenance may include the replacement of dwelling equipment... consideration the type of construction and dwelling equipment. This Schedule shall (1) list each item of... reserve requirements for 90 days the LHA shall invest the excess in federally insured savings accounts...

  10. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    time by maximising expected total utility over the day, their departure times are conditional on rates of utility derived at these locations. For forecasting and economic evaluation of planning alternatives, it is desirable to have simple forms of utility rates with few parameters. Several forms......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time......-differentiated congestion pricing. The direction and size of such shifts depend on the traveller’s scheduling preferences, i.e. his preferences for travelling and being at the origin and destination at different times of day (Vickrey, 1973). Moreover, the traveller’s response to and economic value of TTV can be derived...

  11. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  12. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  13. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E. [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1998-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  14. Reliability-Centered Maintenance

    Science.gov (United States)

    1978-12-29

    maintenance is desirable if it is cost-effective. Compressor blades are exposed to ero’,ion and airseals to wear, causing losses in aerodynamic efficiency...this book is how to determine which types of sched- uled maintenance tasks, if any, should be applied to an item and how frequently assigned tasks should...sonnel responsible for equipment design and the personnel responsible for equip- ment maintenance if maximum RCM results are to be achieved. Appendices

  15. Software evolution and maintenance

    CERN Document Server

    Tripathy, Priyadarshi

    2014-01-01

    Software Evolution and Maintenance: A Practitioner's Approach is an accessible textbook for students and professionals, which collates the advances in software development and provides the most current models and techniques in maintenance.Explains two maintenance standards: IEEE/EIA 1219 and ISO/IEC14764Discusses several commercial reverse and domain engineering toolkitsSlides for instructors are available onlineInformation is based on the IEEE SWEBOK (Software Engineering Body of Knowledge)

  16. [Medical Equipment Maintenance Methods].

    Science.gov (United States)

    Liu, Hongbin

    2015-09-01

    Due to the high technology and the complexity of medical equipment, as well as to the safety and effectiveness, it determines the high requirements of the medical equipment maintenance work. This paper introduces some basic methods of medical instrument maintenance, including fault tree analysis, node method and exclusive method which are the three important methods in the medical equipment maintenance, through using these three methods for the instruments that have circuit drawings, hardware breakdown maintenance can be done easily. And this paper introduces the processing methods of some special fault conditions, in order to reduce little detours in meeting the same problems. Learning is very important for stuff just engaged in this area.

  17. Remote Maintenance Monitoring System -

    Data.gov (United States)

    Department of Transportation — The Remote Maintenance and Monitoring System (RMMS) is a collection of subsystems that includes telecommunication components, hardware, and software, which serve to...

  18. Cost benefits of postponing time-based maintenance under lifetime distribution uncertainty

    NARCIS (Netherlands)

    de Jonge, Bram; Dijkstra, Arjan; Romeijnders, Ward

    We consider the problem of scheduling time-based preventive maintenance under uncertainty in the lifetime distribution of a unit, with the understanding that every time a maintenance action is carried out, additional information on the lifetime distribution becomes available. Under such

  19. MOV reliability evaluation and periodic verification scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Bunte, B.D.

    1996-12-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs.

  20. 1993 Wholesale Power and Transmission Rate Schedules.

    Energy Technology Data Exchange (ETDEWEB)

    US Bonneville Power Administration

    1993-10-01

    Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

  1. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  2. Automating Contextualized Maintenance Documentation

    NARCIS (Netherlands)

    Koornneef, H.; Verhagen, W.J.C.; Curran, Ricky; Borsato, M.; Wognum, N.; Peruzzini, M.; Stjepandić, J.; Verhagen, W.J.C.

    2016-01-01

    Currently, task support information in aircraft maintenance is mostly provided using paper-based solutions, which are burdensome, slow and prone to error. Aircraft maintenance documentation contains vast amounts of information irrelevant for the task at hand and even for the simplest tasks multiple

  3. Contextualising aircraft maintenance documentation

    NARCIS (Netherlands)

    Koornneef, H.; Verhagen, W.J.C.; Curran, Ricky

    2017-01-01

    The use of documentation for task support in aircraft line maintenance is still mostly paper-based, which is slow, burdensome and prone to error. This paper provides an overview of the issues associated with the use of paper-based documentation in aircraft line maintenance and describes the

  4. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen; Mayr, Ernst W.; Portier, Natacha

    2014-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous processors and a certain degree of uncertainty about the sizes of jobs. In this paper we address both, and study for the first time a scheduling problem that combines the classical unrelated machine

  5. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  6. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  7. Constraint-Based Scheduling System

    Science.gov (United States)

    Zweben, Monte; Eskey, Megan; Stock, Todd; Taylor, Will; Kanefsky, Bob; Drascher, Ellen; Deale, Michael; Daun, Brian; Davis, Gene

    1995-01-01

    Report describes continuing development of software for constraint-based scheduling system implemented eventually on massively parallel computer. Based on machine learning as means of improving scheduling. Designed to learn when to change search strategy by analyzing search progress and learning general conditions under which resource bottleneck occurs.

  8. Bulletin publication schedule

    CERN Multimedia

    Publications Section, DG-CO Group

    2011-01-01

    The final edition (Nos 51-52/2011 and 1-2-3/2012) of the Bulletin this year will be published on Friday 16 December and will cover events at CERN from 19 December 2011 to 19 January 2012. Announcements for publication in this issue should reach the Communication Group or the Staff Association, as appropriate, by noon on Tuesday 13 December. Bulletin publication schedule for 2012 The table below lists the 2012 publication dates for the paper version of the Bulletin and the corresponding deadlines for the submission of announcements. Please note that all announcements must be submitted by 12.00 noon on Tuesdays at the latest.   Bulletin No. Week number Submission of announcements (before 12.00 midday) Bulletin Web version Bulletin Printed version 4-5   Tuesday 17 January Fridays 20 and 27 January Wednesday25 January 6-7   Tuesday 31 January Fridays 3 and 10 February Wednesday 8 February 8-9 Tuesday 14 February Fridays 17 and 24 february Wednesday 22 Februa...

  9. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  10. Multiuser Switched Diversity Scheduling Schemes

    CERN Document Server

    Shaqfeh, Mohammad; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback sys...

  11. Time Map Maintenance.

    Science.gov (United States)

    1983-10-01

    Goethes Faust , to the library. You have in mind a particular route, namely the scenic path through the park, and a particular mode of transportation...bike-path))) update) ADDING (PASSUME EVENT5 (pout (fragile Goethes - Faust )) update) ADDING (PASSUNE EVENT5 (pin (spans (clear-skies))) update) ADDING...in EVENT5 for task (transport Goathes- Faust bike-path) is bicycle. Scheduling advice simply notes potential Scheduling advice: conflicts and suggests

  12. LHC Report: The machine under maintenance

    CERN Multimedia

    Katy Foraz for the LHC Team

    2012-01-01

    The LHC Christmas break started on 12 December. Since then, teams have been working hard to complete all the maintenance work planned to ensure the reliable operation of the LHC in 2012.   Installation of shielding at Point 1. The maintenance work is being carried out on key infrastructure such as the cooling, ventilation, electricity and safety systems. Maintenance work is being carried out not just in the LHC but also across the whole accelerator complex, which makes planning the work even more complicated. At the time of going to print, 50% of the cryogenics system maintenance has been finished, which, according to the schedule, will allow the LHC teams to start cooling down the first sectors next week to have the entire machine cold by the end of February. A lot of activity is going on in order to mitigate the effects of radiation on equipment installed in the LHC tunnel and underground areas during 2012 operation. To this end, teams have installed additional shielding at Point 1 (see ph...

  13. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    the cost of a neighbourhood of schedules. The scheduling algorithm attempts to find a small set of schedules with an acceptable level of performance. The approach is demonstrated to significantly improve the robustness and flexibility of the schedules while at the same time producing schedules with a low...

  14. 21 CFR 1308.12 - Schedule II.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule II. 1308.12 Section 1308.12 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE SCHEDULES OF CONTROLLED SUBSTANCES Schedules § 1308.12 Schedule II. (a) Schedule II shall consist of the drugs and other substances, by...

  15. 21 CFR 1308.14 - Schedule IV.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule IV. 1308.14 Section 1308.14 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE SCHEDULES OF CONTROLLED SUBSTANCES Schedules § 1308.14 Schedule IV. (a) Schedule IV shall consist of the drugs and other substances, by...

  16. 21 CFR 1308.11 - Schedule I.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule I. 1308.11 Section 1308.11 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE SCHEDULES OF CONTROLLED SUBSTANCES Schedules § 1308.11 Schedule I. (a) Schedule I shall consist of the drugs and other substances, by whatever...

  17. 21 CFR 1308.15 - Schedule V.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule V. 1308.15 Section 1308.15 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE SCHEDULES OF CONTROLLED SUBSTANCES Schedules § 1308.15 Schedule V. (a) Schedule V shall consist of the drugs and other substances, by whatever...

  18. Maintenance Process Strategic Analysis

    Science.gov (United States)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  19. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  20. Mobile network maintenance (GSM)

    CERN Multimedia

    IT Department

    2009-01-01

    Maintenance work will be carried out on the CERN mobile network infrastructure (GSM) on the 23 and 24 July from 6 p.m. to 6 a.m. in order to replace discontinued equipment and to increase the bandwidth capacity of the GSM mobile network. All CERN GSM emitters (40 units) will be moved one by one to the new infrastructure during the maintenance. The call of a user connected to an emitter at the time of its maintenance will be cut off. However, the general overlapping of the GSM radio coverage should mean that users are able immediately to call again should their call be interrupted. IT/CS/CS

  1. Powerful drivers for maintenance.

    Science.gov (United States)

    Mason, Steve

    2013-10-01

    A UPS system is the central building block of a Power Continuity Plan in medical facilities, but such equipment requires careful maintenance to continue fulfilling its vital role in delivering power resilience, and avoid catastrophic downtime, and potentially tens of thousands of pounds in costs to rectify the issues caused by poor maintenance. In our latest technical guidance article, Steve Mason, MD at Bender UK, one of the leading providers of isolated power supplies, theatre control panels, UPS systems, and Steris surgical products, and a turnkey provider of solutions for safe handling of electrical power and advanced provision of critical care products, examines some of the issue surrounding UPS maintenance.

  2. Technical-economical diagnosis to schedule the maintenance shut downs of thermal power stations departing from behavior, economic engineering and thermo-economic tests; Diagnostico tecnico economico para programar las salidas a mantenimiento de centrales termicas a partir de pruebas de comportamiento, ingenieria economica y termo economia

    Energy Technology Data Exchange (ETDEWEB)

    Arreguin Arredondo, Antonio

    2002-08-01

    The thesis work develops a methodology to determine when it is convenient, technically and economically to provide maintenance to a thermal electric unit and the type of maintenance to be performed, all this sustained in an economic analysis taking into account the variation of the production costs, of the interest rates, of the fuel prices and of the electric energy prices, the maintenance costs and the degradation of the unit in the time. Once analyzed the previous matters a thermo-economic test model and reference (values provided by the manufacturer) is performed and they are compared to determine in what equipment or system of the process of electric energy generation is required to focus on the material resources as well as on the human resources, in order to obtain the best results from the maintenance and recover the greatest possible efficiency of the unit. [Spanish] El trabajo de tesis desarrolla una metodologia para determinar cuando conviene, tecnica y economicamente proporcionar mantenimiento a una unidad termica y el tiempo de mantenimiento a realizar, todo esto sustentado en un analisis economico tomando en cuenta la variacion de los costos de produccion de las tasas de interes, de los precios del combustible y de la energia electrica, el costo de mantenimiento y la degradacion de la unidad en el tiempo. Una vez analizado lo anterior se realiza un modelo termoeconomico de prueba y referencia (valores proporcionados por el fabricante) y se comparan para determinar en que equipos o sistema del proceso de generacion de energia electrica se requiere enfocar tanto los recursos materiales como humanos, con el fin de obtener mejores resultados del mantenimiento y recuperar lo mayor posible la eficiencia de la unidad.

  3. Development of standardized component\\0x2010based equipment specifications and transition plan into a predictive maintenance strategy.

    Science.gov (United States)

    2015-12-01

    This project investigated INDOT equipment records and equipment industry standards to produce standard equipment specifications : and a predictive maintenance schedule for the more than 1100 single and tandem axle trucks in use at INDOT. The research...

  4. Development of standardized component\\0x2010based equipment specifications and transition plan into a predictive maintenance strategy : final report.

    Science.gov (United States)

    2015-12-01

    This project investigated INDOT equipment records and equipment industry standards to produce standard equipment specifications : and a predictive maintenance schedule for the more than 1100 single and tandem axle trucks in use at INDOT. The research...

  5. Proposed Rule and Related Materials for Heavy-Duty Highway Program: Revisions for Emergency Vehicles and SCR Maintenance

    Science.gov (United States)

    May 23, 2012, Notice of Proposed Rulemaking with revisions related to emissions controls on diesel-powered emergency vehicles and revisions related to scheduled maintenance intervals for diesel engines and vehicles using Selective Catalytic Reduction (SCR)

  6. Maintenance – Wind Energy Production

    OpenAIRE

    Sankaranarayanan, Vairamayil

    2015-01-01

    This thesis investigates issues like maintenance problems, key factors, maintenance challenges, maintenance solutions and practical difficulties in wind energy. In this case, surveys and interviews have been taken from several companies and maintenance experts, to find most prevailing problems and problem-solving methods since last few years. It helps to show, how the energy maintenance has been developed in past few years. Also it analyses the impact of fourth generation maintenance in wind ...

  7. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedules for Infants and Children United States, 2017 ... any questions. View or Print a Schedule Recommended Immunizations for Children (Birth through 6 years) Schedule for ...

  8. Evaluation of maintenance strategies.

    Science.gov (United States)

    2013-11-01

    In the mid1990s, the Arizona Department of Transportation (ADOT) initiated the Maintenance Cost : Effectiveness study (SPR 371) with the development of plans and an experiment design to evaluate the : effectiveness of a variety of asphalt pavement...

  9. Automating Preventive Maintenance.

    Science.gov (United States)

    Oshier, Michael J.

    1984-01-01

    Describes the following aspects of the State University of New York-Brockport's preventive maintenance computerization project: (1) software selection, (2) project implementation; and (3) problems and benefits of the system. (MCG)

  10. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  11. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  12. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  13. Optimizing stormwater treatment practices a handbook of assessment and maintenance

    CERN Document Server

    Erickson, Andrew J; Gulliver, John S

    2013-01-01

    Optimizing Stormwater Treatment Practices: A Handbook of Assessment and Maintenance provides the information necessary for developing and operating an effective maintenance program for stormwater treatment. The book offers instructions on how to measure the level of performance of stormwater treatment practices directly and bases proposed maintenance schedules on actual performance and historical maintenance efforts and costs. The inspection methods, which are proven in the field and have been implemented successfully, are necessary as regulatory agencies are demanding evaluations of the performance of stormwater treatment practices. The authors have developed a three-tiered approach that offers readers a standard protocol for how to determine the effectiveness of stormwater treatment practices currently in place. This book also: Provides a standard protocol for how to determine the effectiveness of stormwater treatment practices Assists readers with identifying which assessment techniques to use for stormwa...

  14. New Models for Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Petersen, Kristian R.

    Operations and maintenance (O&M) processes are important for keeping offshore wind turbines in operation. Costs related to such activities constitute approximately 30% of the lifetime cost of an offshore wind farm project. Currently, the offshore wind energy industry has shown a rapid increase....... First, how lean can be instituted in an offshore wind farm was investigated. The research included investigations of how lean has contributed to the reduction of scheduled maintenance time as well as the increase of wind turbine availability. Based on field studies, seven types of O&M wastes related...... to offshore wind turbines were defined, from which findings from the case study on lean were analysed. In this analysis it is identified that Modularisation involving maintenance resources and tasks can be used to streamline operations and maintenance processes further. For the medium-term tactical...

  15. Risk-based Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Nielsen, Jannie Jessen

    2011-01-01

    statistics and costs of the different operations. The different OM strategies are described and compared in an illustrative example with focus on which types of information that are needed. Special focus is on comparison between risk-based maintenance strategies and the conventional maintenance planning......For offshore wind turbines, costs to Operation and Maintenance (OM) are substantial, and can be expected to increase when wind farms are placed at deeper water depths and in more harsh environments. Traditional strategies for OM include corrective and preventive (scheduled and condition......-based) maintenance strategies. This paper describes a risk-based life-cycle approach for optimal planning of OM and design of offshore wind turbines. Damage accumulation models used to describe deterioration mechanisms such as fatigue, corrosion, wear and erosion are associated with significant uncertainty...

  16. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  17. [Contact lens care and maintenance].

    Science.gov (United States)

    Bloise, L

    2017-04-01

    All contact lenses with replacement schedules longer than daily must be maintained. At each step of their use, the lenses may be contaminated. Contact lens solutions perform the essential functions of cleaning, decontaminating and preserving the lenses to prevent infectious problems and improve wearing comfort. Contact lens contamination essentially comes from hands, cleaning solutions, cases, water and the environment. The pathogenic microorganisms are mainly Gram-negative bacteria, fungi and amoebae. Contact lens deposits may or may not have an organic origin. Their presence increases the risk of infection because they serve as a nutrient matrix for microbes, and they are responsible for wearing discomfort. Contact lens solutions differ in their composition, their mechanism of action and the concentration of the various agents. To prescribe the best lens care system to each wearer and for each material, it is necessary to be very familiar with them. Maintenance is the main cause of discomfort with contact lenses, either through improper use, solution-material incompatibility, or a reaction of the wearer to the components. Copyright © 2017 Elsevier Masson SAS. All rights reserved.

  18. Search Strategies for Scheduling Problems

    OpenAIRE

    Kypta, Tomáš

    2012-01-01

    In the present work I compare the search strategies for solving scheduling problems from the view of constraint programming. The thesis is focused on scheduling problems containing alternative activities. An analysis of previously published various ways of modelling the problems is provided, next description and experimental comparison of search strategies targetting these models is provided. The influence of strategies on the speed of the solver is studied primarily. As a sideeffect the work...

  19. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  20. Study of the operation and maintenance costs of the Wavepower Limited Lancaster Flexible Bag system

    Energy Technology Data Exchange (ETDEWEB)

    Corrie, N.J.B.

    1981-11-01

    A maintenance strategy to support the credibility of the Lancaster Flexible Bag wave energy concept, covering scheduled maintenance (servicing and overhaul) and unscheduled maintenance (repair) has been developed and costed. Costs are presented on an annual basis for a turbo-alternator overhaul life of five years (for helicopter and hovercraft maintenance crew transit options) and for a turbo-alternator overhaul life of ten years (hovercraft transit option only). For the case where a turbo-alternator overhaul life of ten years is specified, annual scheduled maintenance costs, including replacements, are Pound 16.15M (0.092 p/kW-h installed); repair and contingency costs are Pound 8.64M (0.050 p/kW-h installed).

  1. Non-clairvoyant Scheduling Games

    Science.gov (United States)

    Dürr, Christoph; Nguyen, Kim Thang

    In a scheduling game, each player owns a job and chooses a machine to execute it. While the social cost is the maximal load over all machines (makespan), the cost (disutility) of each player is the completion time of its own job. In the game, players may follow selfish strategies to optimize their cost and therefore their behaviors do not necessarily lead the game to an equilibrium. Even in the case there is an equilibrium, its makespan might be much larger than the social optimum, and this inefficiency is measured by the price of anarchy - the worst ratio between the makespan of an equilibrium and the optimum. Coordination mechanisms aim to reduce the price of anarchy by designing scheduling policies that specify how jobs assigned to a same machine are to be scheduled. Typically these policies define the schedule according to the processing times as announced by the jobs. One could wonder if there are policies that do not require this knowledge, and still provide a good price of anarchy. This would make the processing times be private information and avoid the problem of truthfulness. In this paper we study these so-called non-clairvoyant policies. In particular, we study the RANDOM policy that schedules the jobs in a random order without preemption, and the EQUI policy that schedules the jobs in parallel using time-multiplexing, assigning each job an equal fraction of CPU time.

  2. Building relationships for better maintenance.

    Science.gov (United States)

    Lee, Hackman Hon Yin; Scott, David

    2009-02-01

    Effective management of building maintenance is a vital ingredient in ensuring a high quality built environment for any building's occupiers. However, maintenance is not high on the list of priorities for most organisations. Communication between top management personnel looking at maintenance issues from a strategic standpoint and maintenance staff considering them at an operational level is often not as good as it should be. When planning maintenance activities maintenance personnel often draw too heavily on their technical experience and expertise without taking sufficient account of wider organisational objectives or consulting effectively with top management. Senior managers also regularly complain about lack of managerial input from maintenance departments. Such barriers contribute to communication difficulties between top management at a strategic level and maintenance personnel at an operational level. Identifying where the key differences lie in senior managers' and maintenance personnel's viewpoints on maintenance strategy can prove invaluable in achieving some convergence of opinions and optimising the efficiency of the overall building maintenance process.

  3. Differing antidepressant maintenance methodologies.

    Science.gov (United States)

    Safer, Daniel J

    2017-10-01

    The principle evidence that antidepressant medication (ADM) is an effective maintenance treatment for adults with major depressive disorder (MDD) is from placebo substitution trials. These trials enter responders from ADM efficacy trials into randomized, double-blind placebo-controlled (RDBPC) effectiveness trials to measure the rate of MDD relapse over time. However, other randomized maintenance trial methodologies merit consideration and comparison. A systematic review of ADM randomized maintenance trials included research reports from multiple databases. Relapse rate was the main effectiveness outcome assessed. Five ADM randomized maintenance methodologies for MDD responders are described and compared for outcome. These effectiveness trials include: placebo-substitution, ADM/placebo extension, ADM extension, ADM vs. psychotherapy, and treatment as usual. The placebo-substitution trials for those abruptly switched to placebo resulted in unusually high (46%) rates of relapse over 6-12months, twice the continuing ADM rate. These trials were characterized by selective screening, high attrition, an anxious anticipation of a switch to placebo, and a risk of drug withdrawal symptoms. Selectively screened ADM efficacy responders who entered into 4-12month extension trials experienced relapse rates averaging ~10% with a low attrition rate. Non-industry sponsored randomized trials of adults with multiple prior MDD episodes who were treated with ADM maintenance for 1-2years experienced relapse rates averaging 40%. Placebo substitution trial methodology represents only one approach to assess ADM maintenance. Antidepressant maintenance research for adults with MDD should be evaluated for industry sponsorship, attrition, the impact of the switch to placebo, and major relapse differences in MDD subpopulations. Copyright © 2017. Published by Elsevier Inc.

  4. A choice function hyper-heuristic framework for the allocation of maintenance tasks in Danish railways

    DEFF Research Database (Denmark)

    Pour, Shahrzad M.; Drake, John H.; Burke, Edmund K.

    2017-01-01

    A new signalling system in Denmark aims at ensuring fast and reliable train operations, however imposes very strict time limits on recovery plans in the event of failure. As a result, it is necessary to develop a new approach to the entire maintenance scheduling process. In the largest region...... of Denmark, the Jutland peninsula, there is a decentralised structure for maintenance planning, whereby the crew start their duties from their home locations rather than starting from a single depot. In this paper, we allocate a set of maintenance tasks in Jutland to a set of maintenance crew members...

  5. Compliance with periodontal maintenance at the University of Pittsburgh: Retrospective analysis of 315 cases.

    Science.gov (United States)

    Famili, Pouran; Short, Elizabeth

    2010-01-01

    Maintenance care is the most important part of periodontal treatment because maintenance - adherence to the schedule of recall dental appointments after treatment - is believed to be the key in preventing the recurrence of periodontal disease. This article is a retrospective analysis of 315 cases from the Department of Periodontics and Preventive Dentistry at the University of Pittsburgh to determine compliance with periodontal maintenance schedules over a two-year period. Following the completion of periodontal surgical treatment, patients were placed on a regimen of maintenance care that included recalls every three months, professional prophylaxis by the hygiene faculty, and repeated instructions in home self-care. Medical records and patient charts of 315 subjects were selected randomly and reviewed in terms of the patient's attending the scheduled recall visit. It was hypothesized that female subjects would show better compliance with the maintenance care regimen than male subjects, as suggested in the literature. Among the 315 subjects, 112 (54 women and 58 men) followed the recommended recall schedule; 30% ultimately returned for the three-month prophylaxis recall visit after the initial periodontal surgical appointment, and thus were considered to have complied with the suggested maintenance program. The investigators failed to reject the stated hypothesis that women would display better compliance than men (p = 0.3).

  6. Application of genetic algorithm for scheduling and schedule coordination problems

    Energy Technology Data Exchange (ETDEWEB)

    Shrivastava, P. [S. P. Engineering College, Dept. of Civil Engineering, Andheri (W), Mumbai (India); Dhingra, S. L. [ITT Bombay, Dept. of Civil Enginering, Mumbai (India); Gundaliya, P. J. [L. D. College of Engineeering, Dept. of Civil Engineering, Ahmedabad, Gujrat (India)

    2002-12-31

    Problems of scheduling and schedule co-ordination and the conflicting objectives of transportation system users and transportation system operators are discussed. In schedule coordination problems time plays an important role. Users are interested in coordinating services within acceptable waiting time, whereas operators prefer to have lesser service and want to meet higher demands, which invariably increases waiting time. The problems are complex and conventional approaches to solving them are not useful. Genetic algorithm has been identified as an approach which performs well in solving such multi-objective problems. The general algorithmic approach has been found to be highly sensitive to penalties, but assuming that computational time is no constraint and realistic penalties can be decided in advance, judged in terms of their relative importance to outcomes, results can improve substantially. 13 refs., 3 tabs.

  7. Building Maintenance, Management, and Budgeting.

    Science.gov (United States)

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  8. Risk-based maintenance of ethylene oxide production facilities.

    Science.gov (United States)

    Khan, Faisal I; Haddara, Mahmoud R

    2004-05-20

    This paper discusses a methodology for the design of an optimum inspection and maintenance program. The methodology, called risk-based maintenance (RBM) is based on integrating a reliability approach and a risk assessment strategy to obtain an optimum maintenance schedule. First, the likely equipment failure scenarios are formulated. Out of many likely failure scenarios, the ones, which are most probable, are subjected to a detailed study. Detailed consequence analysis is done for the selected scenarios. Subsequently, these failure scenarios are subjected to a fault tree analysis to determine their probabilities. Finally, risk is computed by combining the results of the consequence and the probability analyses. The calculated risk is compared against known acceptable criteria. The frequencies of the maintenance tasks are obtained by minimizing the estimated risk. A case study involving an ethylene oxide production facility is presented. Out of the five most hazardous units considered, the pipeline used for the transportation of the ethylene is found to have the highest risk. Using available failure data and a lognormal reliability distribution function human health risk factors are calculated. Both societal risk factors and individual risk factors exceeded the acceptable risk criteria. To determine an optimal maintenance interval, a reverse fault tree analysis was used. The maintenance interval was determined such that the original high risk is brought down to an acceptable level. A sensitivity analysis is also undertaken to study the impact of changing the distribution of the reliability model as well as the error in the distribution parameters on the maintenance interval.

  9. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  10. Nurse Scheduling Using Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    Komgrit Leksakul

    2014-01-01

    Full Text Available This study applied engineering techniques to develop a nurse scheduling model that, while maintaining the highest level of service, simultaneously minimized hospital-staffing costs and equitably distributed overtime pay. In the mathematical model, the objective function was the sum of the overtime payment to all nurses and the standard deviation of the total overtime payment that each nurse received. Input data distributions were analyzed in order to formulate a simulation model to determine the optimal demand for nurses that met the hospital’s service standards. To obtain the optimal nurse schedule with the number of nurses acquired from the simulation model, we proposed a genetic algorithm (GA with two-point crossover and random mutation. After running the algorithm, we compared the expenses and number of nurses between the existing and our proposed nurse schedules. For January 2013, the nurse schedule obtained by GA could save 12% in staffing expenses per month and 13% in number of nurses when compare with the existing schedule, while more equitably distributing overtime pay between all nurses.

  11. Scheduling at the Los Alamos Neutron Science Center (LANSCE)

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, F.R.

    1999-02-01

    The centerpieces of the Los Alamos Neutron Science Center (LANSCE) are a half-mile long 800-MeV proton linear accelerator and proton storage ring. The accelerator, storage ring, and target stations provide the protons and spallation neutrons that are used in the numerous basic research and applications experimental programs supported by the US Department of Energy. Experimental users, facility maintenance personnel, and operations personnel must work together to achieve the most program benefit within defined budget and resource constraints. In order to satisfy the experimental users programs, operations must provide reliable and high quality beam delivery. Effective and efficient scheduling is a critical component to achieve this goal. This paper will detail how operations scheduling is presently executed at the LANSCE accelerator facility.

  12. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use of...

  13. Gain scheduling using the youla parameterization

    DEFF Research Database (Denmark)

    Niemann, H.H.; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector theta cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector theta has been derived by using the Youla parameterization...

  14. Flexible Scheduling to Fit the Firefighters.

    Science.gov (United States)

    Cox, Clarice Robinson

    Three flexible scheduling plans were tried in order that firefighters could take regular college courses despite their 24 hours on the 24 off work schedule. Plan one scheduled the firefighters into a regular Monday-Wednesday-Friday class which they attended every other week, making up missed material outside of class. Plan two scheduled special…

  15. PROACTIVE STRATEGY MAINTENANCE

    Directory of Open Access Journals (Sweden)

    Stanisław RADKOWSKI

    2014-03-01

    Full Text Available Given challenging competition of today service providers are required to be more proactive in satisfying the environmental conditions and customer needs. Proactive maintenance should start at the design stage with establishing the functions, functional failures and failure modes. The understanding the failure behavior, especially the relationship between potential failures, functional failures and diagnostic parameters is the most important task. In the next step the designer have to explore the maintenance activities as they have to apply to the design criteria. The models and frameworks have been presented in the paper also a comprehensive review of literature and some results of laboratory investigations.

  16. Optimal randomized scheduling by replacement

    Energy Technology Data Exchange (ETDEWEB)

    Saias, I.

    1996-05-01

    In the replacement scheduling problem, a system is composed of n processors drawn from a pool of p. The processors can become faulty while in operation and faulty processors never recover. A report is issued whenever a fault occurs. This report states only the existence of a fault but does not indicate its location. Based on this report, the scheduler can reconfigure the system and choose another set of n processors. The system operates satisfactorily as long as, upon report of a fault, the scheduler chooses n non-faulty processors. We provide a randomized protocol maximizing the expected number of faults the system can sustain before the occurrence of a crash. The optimality of the protocol is established by considering a closely related dual optimization problem. The game-theoretic technical difficulties that we solve in this paper are very general and encountered whenever proving the optimality of a randomized algorithm in parallel and distributed computation.

  17. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington.

  18. Fuzzy scheduled RTDA controller design.

    Science.gov (United States)

    Srinivasan, K; Anbarasan, K

    2013-03-01

    In this paper, the design and development of fuzzy scheduled robustness, tracking, disturbance rejection and overall aggressiveness (RTDA) controller design for non-linear processes are discussed. pH process is highly non-linear and the design of good controller for this process is always a challenging one due to large gain variation. Fuzzy scheduled RTDA controller design based on normalized integral square error (N_ISE) performance criteria for pH neutralization process is developed. The applicability of the proposed controller is tested for other different non-linear processes like type I diabetic process and conical tank process. The servo and regulatory performance of fuzzy scheduled RTDA controller design is compared with well-tuned internal model control (IMC) and dynamic matrix control (DMC)-based control schemes. Copyright © 2012 ISA. Published by Elsevier Ltd. All rights reserved.

  19. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Ravn, Anders P.

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  20. ECS: Efficient Communication Scheduling for Underwater Sensor Networks

    Directory of Open Access Journals (Sweden)

    Lu Hong

    2011-03-01

    Full Text Available TDMA protocols have attracted a lot of attention for underwater acoustic sensor networks (UWSNs, because of the unique characteristics of acoustic signal propagation such as great energy consumption in transmission, long propagation delay and long communication range. Previous TDMA protocols all allocated transmission time to nodes based on discrete time slots. This paper proposes an efficient continuous time scheduling TDMA protocol (ECS for UWSNs, including the continuous time based and sender oriented conflict analysis model, the transmission moment allocation algorithm and the distributed topology maintenance algorithm. Simulation results confirm that ECS improves network throughput by 20% on average, compared to existing MAC protocols.

  1. ECS: efficient communication scheduling for underwater sensor networks.

    Science.gov (United States)

    Hong, Lu; Hong, Feng; Guo, Zhongwen; Li, Zhengbao

    2011-01-01

    TDMA protocols have attracted a lot of attention for underwater acoustic sensor networks (UWSNs), because of the unique characteristics of acoustic signal propagation such as great energy consumption in transmission, long propagation delay and long communication range. Previous TDMA protocols all allocated transmission time to nodes based on discrete time slots. This paper proposes an efficient continuous time scheduling TDMA protocol (ECS) for UWSNs, including the continuous time based and sender oriented conflict analysis model, the transmission moment allocation algorithm and the distributed topology maintenance algorithm. Simulation results confirm that ECS improves network throughput by 20% on average, compared to existing MAC protocols.

  2. On the computational complexity of (maximum) class scheduling

    OpenAIRE

    Kroon, Leo; Kolen, A.W.J.

    1991-01-01

    textabstractIn this paper we consider several generalizations of the Fixed Job Scheduling Problem (FSP) which appear in a natural way in the aircraft maintenance process at an airport: A number of jobs have to be carried out, where the main attributes of a job are: a fixed start time, a fixed finish time, a value representing the job's priority and a job class. For carrying out these jobs a number of machines are available. These machines can be split up into a number of disjoint machine clas...

  3. IMPROVEMENT DIRECTIONS OF MAINTENANCE SYSTEM OF MULTIPLE UNIT

    Directory of Open Access Journals (Sweden)

    O. S. Krasheninin

    2014-07-01

    Full Text Available Purpose. Efficiency of function multiple units park (MUP as a complex system considerably depends on the modes and conditions of its operation, which is defined as the state of their eigenstate and state of the system content. The purpose is the decision scientifically - a technical problem of system of the content of maintenance operation and repair of a rolling stock. Methodology. Article is devoted to a question of the maintenance operation and repair of a rolling stock of Ukraine. On the basis of theoretical probe, the situation which has developed on maintenance operation and repair of MVPS is analysed. The comparative analysis of a railway, motor and air transportation is provided. On the basis of the analysis and comparison by authors it is offered transition from scheduled preventive to system of service of railway transport to service on an actual state. Findings. According to given theoretical comparison of the put perspective in different types of transport it is possible to note that experience and features of operation rolling stock in allied industries is the base for revision and improvement of system of the maintenance rolling stock, including at various stages of its operation. Originality. This article provides the comparative theoretical analysis, concerning contents and repair system between railway, automobile and by air. Practical value. Introduction new approaches of the maintenance operation and rolling stocks repair will allow carrying out gradual transition from maintenance operation and repairing existing scheduled preventive system in repair system «on an actual state». Thus it is possible maximum cutting-down of number of sudden refusals in operation, providing high coefficient of operational readiness of a rolling stock (to 0.95. A comparative analysis of the maintenance system and repair is the basis of the transition feasibility.

  4. Hubble Systems Optimize Hospital Schedules

    Science.gov (United States)

    2009-01-01

    Don Rosenthal, a former Ames Research Center computer scientist who helped design the Hubble Space Telescope's scheduling software, co-founded Allocade Inc. of Menlo Park, California, in 2004. Allocade's OnCue software helps hospitals reclaim unused capacity and optimize constantly changing schedules for imaging procedures. After starting to use the software, one medical center soon reported noticeable improvements in efficiency, including a 12 percent increase in procedure volume, 35 percent reduction in staff overtime, and significant reductions in backlog and technician phone time. Allocade now offers versions for outpatient and inpatient magnetic resonance imaging (MRI), ultrasound, interventional radiology, nuclear medicine, Positron Emission Tomography (PET), radiography, radiography-fluoroscopy, and mammography.

  5. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...

  6. Support system for process flow scheduling

    OpenAIRE

    Salomone, Enrique; Chiotti, Omar Juan Alfredo; Lerch, Juan

    2001-01-01

    Process flow scheduling is a concept that refers to the scheduling of flow shop process plants, whose scheduling calculations are guided by the process structure. In a wide variety of high-volume process industries, the process flow scheduling concept implies an integrated structure for planning and scheduling. This integrated vision of the planning function and the very particular characteristics of the process industry production environment challenge the application of the most traditio...

  7. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  8. Telephone Exchange Maintenance

    CERN Document Server

    2005-01-01

    Urgent maintenance work on CERN telephone exchanges will be performed on 24 March from 6 a.m. to 8 a.m. Telephone services may be disrupted or even interrupted during this time. For more details, please contact us by email at Standard.Telephone@cern.ch.

  9. Preventive Maintenance Process

    Science.gov (United States)

    Ciaruffoli, Veronica; Bramley, Craig; Matteson, Mike

    2001-01-01

    The Preventive Maintenance (PM) program at Stennis Space Center (SSC) evolved from an ineffective and poorly organized state to a highly organized state in which it became capable of tracking equipment, planning jobs with man hour estimates, and supporting outsourcing. This viewgraph presentation traces the steps the program took to improve itself.

  10. Floors: Care and Maintenance.

    Science.gov (United States)

    Post Office Dept., Washington, DC.

    Guidelines, methods and policies regarding the care and maintenance of post office building floors are overviewed in this handbook. Procedures outlined are concerned with maintaining a required level of appearance without wasting manpower. Flooring types and characteristics and the particular cleaning requirements of each type are given along with…

  11. Floors: Selection and Maintenance.

    Science.gov (United States)

    Berkeley, Bernard

    Flooring for institutional, commercial, and industrial use is described with regard to its selection, care, and maintenance. The following flooring and subflooring material categories are discussed--(1) resilient floor coverings, (2) carpeting, (3) masonry floors, (4) wood floors, and (5) "formed-in-place floors". The properties, problems,…

  12. Diesel Vehicle Maintenance Competencies.

    Science.gov (United States)

    Braswell, Robert; And Others

    Designed to provide a model set of competencies, this manual presents tasks which were identified by employers, employees, and teachers as important in a postsecondary diesel vehicle maintenance curriculum. The tasks are divided into seven major component areas of instruction: chassis and suspension, diesel engines, diesel fuel, electrical,…

  13. Maintenance: problem and solution

    CERN Multimedia

    CERN Bulletin

    2012-01-01

    Equipment that is often unique, machines that are as old as the Laboratory, continuous and demanding performance requirements: these are the challenges faced by CERN’s accelerator maintenance teams. There are some twenty such teams, attached to different departments. A new project aims to standardise their procedures to make their work easier, and you can be a part of it.   “For the past year or so, the Accelerator and Technologies Sector and the GS Department have been working together on identifying the needs of the different teams that perform maintenance on CERN’s equipment. We are now ready to provide computer support with detailed specifics about the processes that need to be set up,” explains Goran Perinić, one of the leaders in CERN’s new Maintenance Management project (MMP). Since the LHC entered operation, the responsibilities of the technical teams have been broadened to cover maintenance of the collider and that of its injectors...

  14. Maintenance in sustainable manufacturing

    Directory of Open Access Journals (Sweden)

    Vladimir Stuchly

    2014-09-01

    Full Text Available Background: Sustainable development is about reaching a balance between economic, social, and environmental goals, as well as people's participation in the planning process in order to gain their input and support. For a company, sustainable development means adoption of such business strategy and actions that contribute to satisfying present needs of company and stakeholders, as well as simultaneous protection, maintenance and strengthening of human and environmental potential which will be needed in the future. This new approach forces manufacturing companies to change their previous management paradigms. New management paradigm should include new issues and develop innovative methods, practices and technologies striving for solving problem of shortages of resources, softening environment overload and enabling development of environment-friendly lifecycle of products. Hence, its realization requires updating existing production models as they are based on previously accepted paradigm of unlimited resources and unlimited regeneration capabilities. Maintenance plays a crucial role because of its impact on availability, reliability, quality and life cycle cost, thus it should be one of the main pillars of new business running model.  Material and methods: The following paper is a result of research on the literature and observation of practices undertaken by a company within maintenance area. Results and conclusions: The main message is that considering sustainable manufacturing requires considerable expanding range of analysis and focusing on supporting processes. Maintenance offers numerous opportunities of decreasing influence of business processes on natural environment and more efficient resources utilization. The goal of maintenance processes realizing sustainable development strategy is increased profitability of exploitation and optimization of total lifecycle cost without disturbing safety and environmental issues. 

  15. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  16. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    Dynamic models of congestion so far rely on exogenous scheduling preferences of travelers, based for example on disutility of deviation from a preferred departure or arrival time for a trip. This paper provides a more fundamental view in which travelers derive utility just from consumption and le...

  17. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  18. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  19. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    . Compared to the predictions of an analyst observing untolled equilibrium and taking scheduling preferences as exogenous, we find that both the optimal capacity and the marginal external cost of congestion have changed. The benefits of tolling are greater, and the optimal time varying toll is different....

  20. Scheduling EURO-k Conferences

    DEFF Research Database (Denmark)

    Stidsen, Thomas Jacob Riis; Pisinger, David; Vigo, Daniele

    2017-01-01

    EURO-k conferences are among the largest Operations Research conferences in the world, typically including more than 2000 presentations. As opposed to many other conferences, EURO-k conferences are hierarchically organized, and the conference schedule should reflect this structure to make...

  1. Robustness analysis of multiprocessor schedules

    NARCIS (Netherlands)

    Adyanthaya, S.; Zhang, Z.; Geilen, M.; Voeten, J.; Basten, T.; Schiffelers, R.

    2014-01-01

    Tasks executing on general purpose multiprocessor platforms exhibit variations in their execution times. As such, there is a need to explicitly consider robustness, i.e., tolerance to these fluctuations. This work aims to quantify the robustness of schedules of directed acyclic graphs (DAGs) on

  2. Intelligent perturbation algorithms for space scheduling optimization

    Science.gov (United States)

    Kurtzman, Clifford R.

    1991-01-01

    Intelligent perturbation algorithms for space scheduling optimization are presented in the form of the viewgraphs. The following subject areas are covered: optimization of planning, scheduling, and manifesting; searching a discrete configuration space; heuristic algorithms used for optimization; use of heuristic methods on a sample scheduling problem; intelligent perturbation algorithms are iterative refinement techniques; properties of a good iterative search operator; dispatching examples of intelligent perturbation algorithm and perturbation operator attributes; scheduling implementations using intelligent perturbation algorithms; major advances in scheduling capabilities; the prototype ISF (industrial Space Facility) experiment scheduler; optimized schedule (max revenue); multi-variable optimization; Space Station design reference mission scheduling; ISF-TDRSS command scheduling demonstration; and example task - communications check.

  3. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  4. Integrated scheduling of tasks and gynecologists to improve patient appointment scheduling : a case study

    NARCIS (Netherlands)

    van de Vrugt, Maartje; Luen-English, Samuel J.; Bastiaansen, W.A.P.; Kleinluchtenbeld, S.; Lardinois, W.T.P.; Pots, M.H.; Schoonbergen, D.H.; Hans, Erwin W.; Hurink, Johann L.; Boucherie, Richardus J.

    Like many hospital departments, the gynecology department of the Jeroen Bosch Hospital experienced difficulties with scheduling outpatient appointments at the medically preferred times. Despite the time invested in creating the schedule, the compliance of the achieved schedules with the preferences

  5. On Three Competing Maintenance Actions and the Related Condition Control

    Directory of Open Access Journals (Sweden)

    Per-Erik Hagmark

    2011-01-01

    Full Text Available This paper considers three competing maintenance actions: corrective after failure, condition-based preventive to avoid failure, and scheduled. A stochastic model is set for the time relationship between corrective and preventive maintenance. This model defines a version of the so-called random signs censoring, and it leads to natural goodness measures for condition control. The effect of condition control on important observable and unobservable indicators is studied. The latter half of the paper considers static Weibull models for the time to failure and the effect of condition control; the main contribution is a calculation method that derives the four model parameters from four figures of input data. Corresponding parameter experimentation is demonstrated on maintenance cost analysis and condition control design.

  6. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  7. Preventive maintenance study : interim report.

    Science.gov (United States)

    2017-09-01

    This interim report details the performance of 69 test sites treated with various preventive maintenance treatments. The maintenance treatments applied included crack sealing, full lane chip sealing, wheel path chip sealing, dig outs (mill and fill),...

  8. Predictors of weight maintenance

    NARCIS (Netherlands)

    Pasman, W.J.; Saris, W.H.M.; Westerterp-Plantenga, M.S.

    1999-01-01

    Objective: To obtain predictors of weight maintenance after a weight-loss intervention. Research Methods and Procedures: An overall analysis of data from two-long intervention studies [n = 67 women; age: 37.9±1.0 years; body weight (BW): 87.0±1.2 kg; body mass index: 32.1±0.5 kg·m-2; % body fat:

  9. Modeling Spare Parts Demands Forecast under Two-Dimensional Preventive Maintenance Policy

    OpenAIRE

    Hu, Qiwei; Bai, Yongsheng; Zhao, Jianmin; Cao, Wenbin

    2015-01-01

    In maintenance practice, there is such a situation where the spare parts replacement should be carried out at the scheduling time of calendar or usage for whichever comes first. The issue of two-dimensional preventive maintenance usually was not addressed by traditional methods, and at present, few studies were focused on this very topic. Based on these considerations, this paper presented the two-dimensional preventive policy where replacements of spare parts are based on both calendar time ...

  10. Global Outsourcing of Aircraft Maintenance

    OpenAIRE

    McFadden, Michael; Worrells, D. Scott

    2012-01-01

    Before the airlines were deregulated, the majority of air carriers conducted their maintenance in-house. After deregulation, with competitive pressures mounting and airlines failing and starting up seemingly simultaneously, the outsourcing of maintenance became more prevalent. Not restricted to U.S. airlines, outsourcing maintenance has become a global practice. Factors involved in the outsourcing decision range from a startup not having the capital to develop their own in-house maintenance p...

  11. PREVENTIVE MAINTENANCE. HONEYWELL PLANNING GUIDE.

    Science.gov (United States)

    Honeywell, Inc., Minneapolis, Minn.

    THIS HONEYWELL PAMPHLET DISCUSSES SOME ASPECTS OF PREVENTIVE MAINTENANCE OF AUTOMATIC CONTROLS, HEATING, VENTILATING, AND AIR CONDITIONING, AND COMPARES IN-PLANT WITH CONTRACT SERVICE, CONCLUDING THAT CONTRACT SERVICE IS PREFERABLE AND DESCRIBING A NUMBER OF MAINTENANCE PLANS WHICH THEY FURNISH. PREVENTIVE MAINTENANCE PROVIDES--(1) MORE EFFICIENT…

  12. AUTOMOTIVE DIESEL MAINTENANCE. PROGRAM OUTLINE.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    INFORMATIONAL TOPICS COVERED IN THE TEXT MATERIALS AND SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILMS FOR A 2-YEAR, 55 MODULE PROGRAM IN AUTOMOTIVE DIESEL MAINTENANCE ARE GIVEN. THE 30 MODULES FOR "AUTOMOTIVE DIESEL MAINTENANCE 1" ARE AVAILABLE AS VT 005 655 - VT 005 684, AND THE 25 MODULES FOR "AUTOMOTIVE DIESEL MAINTENANCE 2" ARE AVAILABLE…

  13. 77 FR 64848 - Proposed Collection; Comment Request for Form 1120S, Schedule D, Schedule K-1, and Schedule M-3

    Science.gov (United States)

    2012-10-23

    ..., etc., Schedule M-3 (Form 1120S), Net Income (Loss) Reconciliation for S Corporations With Total Assets... Losses and Built-In Gains, Schedule M-3 (Form 1120S), Net Income (Loss) Reconciliation for S Corporations With Total Assets of $10 Million or More, and Schedule K-1 (Form 1120S), Shareholder's Share of Income...

  14. Using Modern Methodologies with Maintenance Software

    Science.gov (United States)

    Streiffert, Barbara A.; Francis, Laurie K.; Smith, Benjamin D.

    2014-01-01

    Jet Propulsion Laboratory uses multi-mission software produced by the Mission Planning and Sequencing (MPS) team to process, simulate, translate, and package the commands that are sent to a spacecraft. MPS works under the auspices of the Multi-Mission Ground Systems and Services (MGSS). This software consists of nineteen applications that are in maintenance. The MPS software is classified as either class B (mission critical) or class C (mission important). The scheduling of tasks is difficult because mission needs must be addressed prior to performing any other tasks and those needs often spring up unexpectedly. Keeping track of the tasks that everyone is working on is also difficult because each person is working on a different software component. Recently the group adopted the Scrum methodology for planning and scheduling tasks. Scrum is one of the newer methodologies typically used in agile development. In the Scrum development environment, teams pick their tasks that are to be completed within a sprint based on priority. The team specifies the sprint length usually a month or less. Scrum is typically used for new development of one application. In the Scrum methodology there is a scrum master who is a facilitator who tries to make sure that everything moves smoothly, a product owner who represents the user(s) of the software and the team. MPS is not the traditional environment for the Scrum methodology. MPS has many software applications in maintenance, team members who are working on disparate applications, many users, and is interruptible based on mission needs, issues and requirements. In order to use scrum, the methodology needed adaptation to MPS. Scrum was chosen because it is adaptable. This paper is about the development of the process for using scrum, a new development methodology, with a team that works on disparate interruptible tasks on multiple software applications.

  15. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  16. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event is availa...... with these displays using their mobile devices by either constructing custom video playlists or adding on-screen content to their personal schedule....

  17. On Optimal Deadlock Detection Scheduling

    OpenAIRE

    Ling, Yibei; Chen, Shigang; Chiang, Cho-Yu Jason

    2010-01-01

    Deadlock detection scheduling is an important, yet often overlooked problem that can significantly affect the overall performance of deadlock handling. Excessive initiation of deadlock detection increases overall message usage, resulting in degraded system performance in the absence of deadlocks; while insufficient initiation of deadlock detection increases the deadlock persistence time, resulting in an increased deadlock resolution cost in the presence of deadlocks. The investigation of this...

  18. Nurse Scheduling Using Genetic Algorithm

    OpenAIRE

    Leksakul, Komgrit; Phetsawat, Sukrit

    2014-01-01

    This study applied engineering techniques to develop a nurse scheduling model that, while maintaining the highest level of service, simultaneously minimized hospital-staffing costs and equitably distributed overtime pay. In the mathematical model, the objective function was the sum of the overtime payment to all nurses and the standard deviation of the total overtime payment that each nurse received. Input data distributions were analyzed in order to formulate a simulation model to determine ...

  19. A Decision Support System for Academic Scheduling.

    Science.gov (United States)

    Burleson, Donald K.; Leivano, Rodrigo J.

    1986-01-01

    Describes the use of a decision support system to operate on a database for academic scheduling. Discusses the scheduling environment, database subsystem, dialog subsystem, modeling subsystem, and output formats. (JM)

  20. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  1. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  2. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  3. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  4. Self-optimization aspects for dynamic scheduling

    OpenAIRE

    Pereira, Ivo; Madureira, Ana Maria

    2010-01-01

    Scheduling is a critical function that is present throughout many industries and applications. A great need exists for developing scheduling approaches that can be applied to a number of different scheduling problems with significant impact on performance of business organizations. A challenge is emerging in the design of scheduling support systems for manufacturing environments where dynamic adaptation and optimization become increasingly important. At this scenario, self-o...

  5. Partially clairvoyant scheduling for aggregate constraints

    OpenAIRE

    Subramani, K.

    2005-01-01

    The problem of partially clairvoyant scheduling is concerned with checking whether an ordered set of jobs, having nonconstant execution times and subject to a collection of imposed constraints, has a partially clairvoyant schedule. Variability of execution times of jobs and nontrivial relationships constraining their executions, are typical features of real-time systems. A partially clairvoyant scheduler parameterizes the schedule, in that the start time of a job in a sequence can depend u...

  6. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    OpenAIRE

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique for planning, scheduling and controlling projects. However, criticism has been raised on the CPM method, specifically in the case of construction projects, for deficient management of construction work and ...

  7. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River Basin Commission. ACTION: Notice... Regulations--Water Supply Charges to revise the schedule of water charges. DATES: The Commission will hold a... the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please contact Paula...

  8. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  9. 21 CFR 1308.49 - Emergency scheduling.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Emergency scheduling. 1308.49 Section 1308.49 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE SCHEDULES OF CONTROLLED SUBSTANCES Hearings § 1308.49 Emergency scheduling. Pursuant to 21 U.S.C. 811(h) and without regard to the...

  10. 14 CFR 121.367 - Maintenance, preventive maintenance, and alterations programs.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance, preventive maintenance, and..., Preventive Maintenance, and Alterations § 121.367 Maintenance, preventive maintenance, and alterations..., preventive maintenance, and alterations that ensures that— (a) Maintenance, preventive maintenance, and...

  11. Motorway maintenance work

    CERN Multimedia

    2005-01-01

    Built 20 years ago, the airport section of the Geneva motorway bypass is now in need of maintenance work and alterations to bring it into line with the new standards. Two-lane traffic will be maintained in both directions during the work, which will be carried out in 2006 and 2007, but there will be various temporary special traffic arrangements in force. We should like to thank you in advance for your understanding. Civil Engineering Department, DAEL, State of Geneva More information: tel. 163 or www.autoroute-aeroport.ch Fewer cars, fewer traffic jams, with www.covoiturage.ch

  12. 14 CFR 43.9 - Content, form, and disposition of maintenance, preventive maintenance, rebuilding, and alteration...

    Science.gov (United States)

    2010-01-01

    ... maintenance, preventive maintenance, rebuilding, and alteration records (except inspections performed in..., PREVENTIVE MAINTENANCE, REBUILDING, AND ALTERATION § 43.9 Content, form, and disposition of maintenance, preventive maintenance, rebuilding, and alteration records (except inspections performed in accordance with...

  13. A planning language for activity scheduling

    Science.gov (United States)

    Zoch, David R.; Lavallee, David; Weinstein, Stuart; Tong, G. Michael

    1991-01-01

    Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.

  14. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... for planning, scheduling and controlling projects. However, criticism has been raised on the CPM method, specifically in the case of construction projects, for deficient management of construction work and discontinuous flow of resources. Alternative scheduling techniques, often called repetitive or linear...

  15. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  16. Key Performance Indicators for Maintenance Management Effectiveness of Public Hospital Building

    Directory of Open Access Journals (Sweden)

    Farhana Omar Mardhiah

    2017-01-01

    Full Text Available Effectiveness of management in maintenance aspect holds the key element in influencing the performance of overall maintenance management. Similarly, public hospital building needs an effective maintenance management as this type of building in nature is one of the most complex issues in the field of maintenance. Improper building maintenance management adopted by the organization significantly will interrupt the overall operation of the building. Therefore, this paper is aim to identifying the key performance indicator (KPI of effectiveness of maintenance management for the public hospital building. A total of 32 set of questionnaires were distributed to the maintenance manager for each hospital in the northern region of peninsular Malaysia by using self-administration strategy. The survey answer was analyzed by performing descriptive analysis in SPSS. Overall, the result of descriptive analysis shows that all the ten factors of effectiveness of maintenance management are accepted as KPI since the mean value is at least 3.93 which classified as important and significant. The most significant factor of effectiveness of maintenance management is task planning and scheduling with the mean score of 4.35. While less significant factor is identify as maintenance approach with the value of mean score is 3.93. The both results indicates that the management need to have well-structured planning for the maintenance works and also need to embrace the exact strategy of maintenance approach in order to achieved better overall performance of maintenance management. This study may draw a standard practice for the government in assessing the performance of public facilities in terms of maintenance management.

  17. Assessing Maintenance Contracts when Preventive Maintenance is Outsourced

    OpenAIRE

    Wu, Shaomin

    2012-01-01

    In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical exampl...

  18. Design Issues in Randomized Clinical Trials of Maintenance Therapies.

    Science.gov (United States)

    Freidlin, Boris; Little, Richard F; Korn, Edward L

    2015-11-01

    A potential therapeutic strategy for patients who respond (or have stable disease) on a fixed-duration induction therapy is to receive maintenance therapy, typically given for a prolonged period of time. To enable patients and clinicians to make informed treatment decisions, the designs of phase III randomized clinical trials (RCTs) assessing maintenance strategies need to be such that their results will provide clear assessment of the relevant risks and benefits of these strategies. We review the key aspects of maintenance RCT designs. Important design considerations include choice of first-line and second-line therapies, minimizing between-arm differences in follow-up schedules, and choice of the primary endpoint. In order to change clinical practice, RCTs should be designed to accurately isolate and quantify the clinical benefit of maintenance as compared with the standard approach of fixed-duration induction followed by the second-line treatment at progression. To accomplish this, RCTs need to utilize an overall survival (or quality of life) endpoint or, in settings where this is not feasible, endpoints that incorporate the effects of the subsequent line of therapy (eg, time from randomization to second progression or death). Toxicity and symptom information over both the study treatment (maintenance) and the second-line treatment should also be collected and reported. Published by Oxford University Press 2015. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  19. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  20. A choice function hyper-heuristic framework for the allocation of maintenance tasks in Danish railways

    DEFF Research Database (Denmark)

    Pour, Shahrzad M.; Drake, John H.; Burke, Edmund K.

    2017-01-01

    A new signalling system in Denmark aims at ensuring fast and reliable train operations, however imposes very strict time limits on recovery plans in the event of failure. As a result, it is necessary to develop a new approach to the entire maintenance scheduling process. In the largest region of ...

  1. The potential cost from passengers and how it impacts railway maintenance and renewal decisions

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Nielsen, Otto Anker

    To plan Maintenance and Renewals (M&R) for the heavy railway lines, scheduling work possession time and deciding the closure of railway line are quite challenging for Infrastructure Manager (IM) at tactical planning level. As usual, the direct costs such as the materials costs, man power price...

  2. Sensitivity of Risk-Based Maintenance Planning of Offshore Wind Turbine Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    2017-01-01

    Inspection and maintenance expenses cover a considerable part of the cost of energy from offshore wind turbines. Risk-based maintenance planning approaches are a powerful tool to optimize maintenance and inspection actions and decrease the total maintenance expenses. Risk-based planning is based...... on many input parameters, which are in reality often not completely known. This paper will assess the cost impact of this incomplete knowledge based on a case study following risk-based maintenance planning. The sensitivity study focuses on weather forecast uncertainties, incomplete knowledge about...... the needed repair time on the site as well as uncertainties about the operational range of the boat and helicopter used to access the broken wind turbine. The cost saving potential is estimated by running Crude Monte Carlo simulations. Furthermore, corrective and preventive (scheduled and condition...

  3. Schedule optimization study implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

  4. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  5. Buildings Lean Maintenance Implementation Model

    Science.gov (United States)

    Abreu, Antonio; Calado, João; Requeijo, José

    2016-11-01

    Nowadays, companies in global markets have to achieve high levels of performance and competitiveness to stay "alive".Within this assumption, the building maintenance cannot be done in a casual and improvised way due to the costs related. Starting with some discussion about lean management and building maintenance, this paper introduces a model to support the Lean Building Maintenance (LBM) approach. Finally based on a real case study from a Portuguese company, the benefits, challenges and difficulties are presented and discussed.

  6. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  7. DCSP hardware maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Pazmino, M.

    1995-11-01

    This paper discusses the necessary changes to be implemented on the hardware side of the DCSP database. DCSP is currently tracking hardware maintenance costs in six separate databases. The goal is to develop a system that combines all data and works off a single database. Some of the tasks that will be discussed in this paper include adding the capability for report generation, creating a help package and preparing a users guide, testing the executable file, and populating the new database with data taken from the old database. A brief description of the basic process used in developing the system will also be discussed. Conclusions about the future of the database and the delivery of the final product are then addressed, based on research and the desired use of the system.

  8. Maintenance performance improvement with System Dynamics : A Corrective Maintenance showcase

    NARCIS (Netherlands)

    Deenen, R.E.M.; Van Daalen, C.E.; Koene, E.G.C.

    2008-01-01

    This paper presents a case study of an analysis of a Corrective Maintenance process to realize performance improvement. The Corrective Maintenance process is supported by SAP, which has indicated the performance realisation problem. System Dynamics is used in a Group Model Building process to

  9. Condition based maintenance in the context of opportunistic maintenance

    NARCIS (Netherlands)

    Koochaki, Javid; Bokhorst, Jos A. C.; Wortmann, Hans; Klingenberg, Warse

    2012-01-01

    Condition based maintenance (CBM) uses the operating condition of a component to predict a failure event. Compared to age based replacement (ABR), CBM usually results in higher availability and lower maintenance costs, since it tries to prevent unplanned downtime and avoid unnecessary preventive

  10. 14 CFR 135.433 - Maintenance and preventive maintenance training program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance and preventive maintenance... SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.433 Maintenance and preventive maintenance training program. Each certificate holder or a person performing maintenance or preventive...

  11. Extending the range of linear scheduling in highway construction

    OpenAIRE

    Bafna, Tarun

    1991-01-01

    Linear Scheduling Method is a powerful graphical scheduling method which is best suited for scheduling projects involving repetitive activities. Highway construction projects are excellent examples of projects displaying repetitive characteristics. The research explores usefulness of linear scheduling in highway construction. The Linear Scheduling Method (LSM) was implemented in the field to schedule highway projects. Problems encountered during the field experience were studied and res...

  12. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  13. A STEPPING STONE TOWARDS KNOWLEDGE BASED MAINTENANCE

    OpenAIRE

    G. Waeyenbergh; L. Pintelon; L. Gelders

    2012-01-01

    Maintenance decision making becomes more and more a management concern. Some decades ago, maintenance was still often considered as an unavoidable side effect of production. The perception of maintenance has evolved considerably. One of the current issues is the maintenance concept, being the mix of maintenance interventions and the general framework for determining this mix. In this paper we describe a modular framework, called Knowledge Based Maintenance, for developing a customised mainten...

  14. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  15. Crew Scheduling for Netherlands Railways: "destination: customer"

    OpenAIRE

    Kroon, Leo; Fischetti, Matteo

    2000-01-01

    textabstract: In this paper we describe the use of a set covering model with additional constraints for scheduling train drivers and conductors for the Dutch railway operator NS Reizigers. The schedules were generated according to new rules originating from the project "Destination: Customer" ("Bestemming: Klant" in Dutch). This project is carried out by NS Reizigers in order to increase the quality and the punctuality of its train services. With respect to the scheduling of drivers and condu...

  16. Religion as Schedule-Induced Behavior

    OpenAIRE

    Strand, Paul S

    2009-01-01

    In this article, I argue that a class of religious behaviors exists that is induced, for prepared organisms, by specific stimuli that are experienced according to a response-independent schedule. Like other schedule-induced behaviors, the members of this class serve as minimal units out of which functional behavior may arise. In this way, there exist two classes of religious behavior: nonoperant schedule-induced behaviors and operant behaviors. This dichotomy is consistent with the distinctio...

  17. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Myburgh, Corrie; Brandborg-Olsen, Dorthe; Albert, Hanne

    2013-01-01

    To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics.......To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics....

  18. Landscaping With Maintenance in Mind.

    Science.gov (United States)

    Sorensen, Randy

    2000-01-01

    Examines school ground landscape design that enhances attractive of the school and provides for easier maintenance. Landscape design issues discussed include choice of grass, trees, and shrubs; irrigation; and safety and access. Other considerations for lessening maintenance problems for facility managers are also highlighted. (GR)

  19. Automated System Programs Preventive Maintenance.

    Science.gov (United States)

    Locke, Richard C.

    1987-01-01

    A preventive maintenance system provides for the monitoring and inspection of school building elements in a programmed way through an automatic checklist. Utility cost savings are expected along with reduction of travel and wait time, and measurable standards of performance for all maintenance and repair work. (MLF)

  20. Preventive Maintenance Handbook. Audiovisual Equipment.

    Science.gov (United States)

    Educational Products Information Exchange Inst., Stony Brook, NY.

    The preventive maintenance system for audiovisual equipment presented in this handbook is designed by specialists so that it can be used by nonspecialists in school sites. The report offers specific advice on saftey factors and also lists major problems that should not be handled by nonspecialists. Other aspects of a preventive maintenance system…

  1. Distributed Link Scheduling with Constant Overhead

    OpenAIRE

    Sanghavi, Sujay; Bui, Loc; Srikant, R.

    2006-01-01

    This paper proposes a new class of simple, distributed algorithms for scheduling in wireless networks. The algorithms generate new schedules in a distributed manner via simple local changes to existing schedules. The class is parameterized by integers $k\\geq 1$. We show that algorithm $k$ of our class achieves $k/(k+2)$ of the capacity region, for every $k\\geq 1$. The algorithms have small and constant worst-case overheads: in particular, algorithm $k$ generates a new schedule using {\\em (a)}...

  2. AVLIS production plant project schedule and milestones

    Energy Technology Data Exchange (ETDEWEB)

    1984-11-15

    An AVLIS Production Plant Deployment Schedule for the engineering, procurement, and construction for both the Initial Increment of Production and the fully Activated Plant, has been developed by the project team consisting of Lawrence Livermore National Laboratory, Martin Marietta Energy Systems, Inc. with architect-engineer support from Bechtel National, Inc., Stone and Webster Engineering Corporation, and Westinghouse Corporation. The initial deployment phase consists of six separators modules and the three laser power amplifier modules consistent with the FY84 reference design with a name plate capacity of 5 million separative work units/yr followed by a full plant activation to approximately 13 million separative work units/yr. The AVLIS Production Plant project team's strategy for deployment schedule analysis focused on three schedule options: engineering limited schedule; authorization limited schedule; and funding limited project schedule. The three deployment schedule options developed by AVLIS project team have been classified in ranges such as an optimistic, rapid/moderate, or moderate/pessimistic based on the probability of meeting the individual schedule option's major milestones or program objectives of enriching uranium by the AVLIS process in an effective cost and schedule manner. 47 figures, 7 tables.

  3. Robots for Aircraft Maintenance

    Science.gov (United States)

    1993-01-01

    Marshall Space Flight Center charged USBI (now Pratt & Whitney) with the task of developing an advanced stripping system based on hydroblasting to strip paint and thermal protection material from Space Shuttle solid rocket boosters. A robot, mounted on a transportable platform, controls the waterjet angle, water pressure and flow rate. This technology, now known as ARMS, has found commercial applications in the removal of coatings from jet engine components. The system is significantly faster than manual procedures and uses only minimal labor. Because the amount of "substrate" lost is minimal, the life of the component is extended. The need for toxic chemicals is reduced, as is waste disposal and human protection equipment. Users of the ARMS work cell include Delta Air Lines and the Air Force, which later contracted with USBI for development of a Large Aircraft Paint Stripping system (LARPS). LARPS' advantages are similar to ARMS, and it has enormous potential in military and civil aircraft maintenance. The technology may also be adapted to aircraft painting, aircraft inspection techniques and paint stripping of large objects like ships and railcars.

  4. Weight maintenance: what's missing?

    Science.gov (United States)

    Hill, James O; Thompson, Helen; Wyatt, Holly

    2005-05-01

    Obesity has reached epidemic proportions in the United States, but there are few proven strategies for either preventing further weight gain or producing permanent weight loss. Our first priority should be to prevent the gradual weight gain experienced by much of the population. Although this will require less behavior change than producing and maintaining weight loss, helping Americans make and sustain the behavior changes needed to prevent gradual weight increases will be challenging. Because approximately 65% of Americans are already overweight or obese, we must also develop effective strategies to help achieve and maintain an amount of weight loss that improves their health and quality of life. Our real challenge is not in helping people lose weight but in helping them keep it off. Many programs have been shown to produce weight loss but few, if any, have been successful in maintenance of weight loss. Our challenge is in understanding how to help people keep off the weight they can lose in several ways.

  5. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    ...-3 (Net Income (Loss) Reconciliation for Certain Partnerships)). DATES: Written comments should be... (Loss) per Return (Schedule M-1), Analysis of Partners' Capital Accounts (Schedule M-2), and Net Income... Revenue Code section 6031 requires partnerships to file returns that show gross income items, allowable...

  6. 14 CFR 91.417 - Maintenance records.

    Science.gov (United States)

    2010-01-01

    ... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Maintenance, Preventive Maintenance... specified in paragraph (b) of this section: (1) Records of the maintenance, preventive maintenance, and... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Maintenance records. 91.417 Section 91.417...

  7. Future Objectives of Maintenance Management in the CV Group

    CERN Document Server

    Annila, L

    1999-01-01

    The ST/CV group has an extensive maintenance contract with a multinational consortium (Gematec-F/I/DE). Annually, the contract costs the group about 6 MCHF. Today the technical monitoring of the performance within the contract has become too irregular and different people's roles have not been sufficiently well defined. It has therefore been decided that all the technical, financial and performance-indicating data should be centrally co-ordinated within the group. The objective is to enable an efficient follow-up of the contract with a view to optimization. Another objective is to migrate to the new, more proficient version of the Computer Aided Maintenance Management (CAMM) software and learn to use it to its full potential. This means using its statistics and analysis features in addition to controlling the maintenance activities, spare-parts store, costs, etc. A further aim is to develop standards for the maintenance and the CAMM. This paper will discuss these objectives and the schedule for their implemen...

  8. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Braaksma, Aleida; Vliegen, Ingrid; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  9. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  10. Informed maintenance for next generation space transportation systems

    Science.gov (United States)

    Fox, Jack J.

    2001-02-01

    Perhaps the most substantial single obstacle to progress of space exploration and utilization of space for human benefit is the safety & reliability and the inherent cost of launching to, and returning from, space. The primary influence in the high costs of current launch systems (the same is true for commercial and military aircraft and most other reusable systems) is the operations, maintenance and infrastructure portion of the program's total life cycle costs. Reusable Launch Vehicle (RLV) maintenance and design have traditionally been two separate engineering disciplines with often conflicting objectives-maximizing ease of maintenance versus optimizing performance, size and cost. Testability analysis, an element of Informed Maintenance (IM), has been an ad hoc, manual effort, in which maintenance engineers attempt to identify an efficient method of troubleshooting for the given product, with little or no control over product design. Therefore, testability deficiencies in the design cannot be rectified. It is now widely recognized that IM must be engineered into the product at the design stage itself, so that an optimal compromise is achieved between system maintainability and performance. The elements of IM include testability analysis, diagnostics/prognostics, automated maintenance scheduling, automated logistics coordination, paperless documentation and data mining. IM derives its heritage from complimentary NASA science, space and aeronautic enterprises such as the on-board autonomous Remote Agent Architecture recently flown on NASA's Deep Space 1 Probe as well as commercial industries that employ quick turnaround operations. Commercial technologies and processes supporting NASA's IM initiatives include condition based maintenance technologies from Boeing's Commercial 777 Aircraft and Lockheed-Martin's F-22 Fighter, automotive computer diagnostics and autonomous controllers that enable 100,000 mile maintenance free operations, and locomotive monitoring

  11. Informed maintenance for next generation reusable launch systems

    Science.gov (United States)

    Fox, Jack J.; Gormley, Thomas J.

    2001-03-01

    Perhaps the most substantial single obstacle to progress of space exploration and utilization of space for human benefit is the safety & reliability and the inherent cost of launching to, and returning from, space. The primary influence in the high costs of current launch systems (the same is true for commercial and military aircraft and most other reusable systems) is the operations, maintenance and infrastructure portion of the program's total life cycle costs. Reusable Launch Vehicle (RLV) maintenance and design have traditionally been two separate engineering disciplines with often conflicting objectives - maximizing ease of maintenance versus optimizing performance, size and cost. Testability analysis, an element of Informed Maintenance (IM), has been an ad hoc, manual effort, in which maintenance engineers attempt to identify an efficient method of troubleshooting for the given product, with little or no control over product design. Therefore, testability deficiencies in the design cannot be rectified. It is now widely recognized that IM must be engineered into the product at the design stage itself, so that an optimal compromise is achieved between system maintainability and performance. The elements of IM include testability analysis, diagnostics/prognostics, automated maintenance scheduling, automated logistics coordination, paperless documentation and data mining. IM derives its heritage from complimentary NASA science, space and aeronautic enterprises such as the on-board autonomous Remote Agent Architecture recently flown on NASA's Deep Space 1 Probe as well as commercial industries that employ quick turnaround operations. Commercial technologies and processes supporting NASA's IM initiatives include condition based maintenance technologies from Boeing's Commercial 777 Aircraft and Lockheed-Martin's F-22 Fighter, automotive computer diagnostics and autonomous controllers that enable 100,000 mile maintenance free operations, and locomotive monitoring

  12. 29 CFR 1952.173 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Developmental schedule. 1952.173 Section 1952.173 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Within 1 year following plan approval, legislation will be enacted authorizing complete...

  13. Lightweight EDF Scheduling with Deadline Inheritance

    NARCIS (Netherlands)

    Jansen, P.G.; Mullender, Sape J.; Scholten, Johan; Havinga, Paul J.M.

    EDFI is a lightweight real-time scheduling protocol that combines EDF with deadline inheritance over shared resources. We will show that EDFI is flexible during a tasks admission control, efficient with scheduling and dispatching, and straightforward in feasibility analysis. The application

  14. Special cases of online parallel job scheduling

    NARCIS (Netherlands)

    Hurink, Johann L.; Paulus, J.J.

    2007-01-01

    In this paper we consider the online scheduling of jobs, which require processing on a number of machines simultaneously. These jobs are presented to a decision maker one by one, where the next job becomes known as soon as the current job is scheduled. The objective is to minimize the makespan. For

  15. 15 CFR 700.14 - Preferential scheduling.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Preferential scheduling. 700.14...) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Industrial Priorities § 700.14 Preferential scheduling. (a) A...

  16. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  17. HEURISTIC SCHEDULING IN A NIGERIA FURNITURE SHOP

    African Journals Online (AJOL)

    NIJOTECH

    shortest processing time rule (SPT), longest processing time rule (LPT), and monetary value of completed order rule (MO); and possibly ascertain whether any of these rules offers a better schedule than the FIFO schedule currently used by the shop. This comparison is carried out on the basis of the combined objective.

  18. Scheduling identical jobs on uniform parallel machines

    NARCIS (Netherlands)

    M.I. Dessouky; B.J. Lageweg; J.K. Lenstra (Jan Karel); S.L. van de Velde

    1990-01-01

    textabstractWe address the problem of scheduling n identical jobs on m uniform parallel machines to optimize scheduling criteria that are nondecreasing in the job completion times. It is well known that this can be formulated as a linear assignment problem, and subsequently solved in O(n3) time. We

  19. Religion as Schedule-Induced Behavior

    Science.gov (United States)

    Strand, Paul S.

    2009-01-01

    In this article, I argue that a class of religious behaviors exists that is induced, for prepared organisms, by specific stimuli that are experienced according to a response-independent schedule. Like other schedule-induced behaviors, the members of this class serve as minimal units out of which functional behavior may arise. In this way, there…

  20. Sensitivity Analysis of List Scheduling Heuristics

    NARCIS (Netherlands)

    A.W.J. Kolen; A.H.G. Rinnooy Kan (Alexander); C.P.M. van Hoesel; A.P.M. Wagelmans (Albert)

    1994-01-01

    textabstractWhen jobs have to be processed on a set of identical parallel machines so as to minimize the makespan of the schedule, list scheduling rules form a popular class of heuristics. The order in which jobs appear on the list is assumed here to be determined by the relative size of their

  1. A computational approach to optimized appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Kemper, B.; Mandjes, M.

    2015-01-01

    Appointment scheduling is prevalent in various healthcare settings. Generally, the objective is to determine a schedule (i.e., the sequence of epochs at which the individual patients are asked to appear) that appropriately balances the interests of the patients (low waiting times) and the medical

  2. 21 CFR 1308.13 - Schedule III.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III. 1308.13 Section 1308.13 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE SCHEDULES OF CONTROLLED SUBSTANCES... 2316 (iii) Pentobarbital 2271 or any salt of any of these drugs and approved by the Food and Drug...

  3. Optimal online-list batch scheduling

    NARCIS (Netherlands)

    Paulus, J.J.; Ye, Deshi; Zhang, Guochuan

    We consider the online-list batch scheduling problem. Jobs arrive one by one and have to be assigned upon arrival to a scheduled batch such that the makespan is minimized. Each batch can accommodate up to B jobs. We give a complete classification of the tractability of this online problem.

  4. Unrelated Machine Scheduling with Stochastic Processing Times

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous processors and a certain degree of uncertainty about the processing times of jobs. In this paper we address both, and study for the first time a scheduling problem that combines the classical unrelated

  5. Machine scheduling with resource dependent processing times

    NARCIS (Netherlands)

    Grigoriev, A.; Sviridenko, M.; Uetz, Marc Jochen

    We consider machine scheduling on unrelated parallel machines with the objective to minimize the schedule makespan. We assume that, in addition to its machine dependence, the processing time of any job is dependent on the usage of a discrete renewable resource, e.g. workers. A given amount of that

  6. 76 FR 18262 - January 2011 Pay Schedules

    Science.gov (United States)

    2011-04-01

    ... members covered by a certified SES performance appraisal system and $165,300 (level III of the Executive Schedule) for SES members covered by an SES performance appraisal system that has not been certified. The... (level II of the Executive Schedule) for SL or ST employees covered by a certified SL/ST performance...

  7. Schedule-extended synchronous dataflow graphs

    NARCIS (Netherlands)

    Damavandpeyma, M.; Stuijk, S.; Basten, T.; Geilen, M.; Corporaal, H.

    2013-01-01

    Synchronous dataflow graphs (SDFGs) are used extensively to model streaming applications. An SDFG can be extended with scheduling decisions, allowing SDFG analysis to obtain properties, such as throughput or buffer sizes for the scheduled graphs. Analysis times depend strongly on the size of the

  8. A Heuristic Approach to Scheduling University Timetables.

    Science.gov (United States)

    Loo, E. H.; And Others

    1986-01-01

    Categories of facilities utilization and scheduling requirements to be considered when using a heuristic approach to timetabling are described together with a nine-step algorithm and the computerized timetabling system, Timetable Schedules System (TTS); TTS utilizes heuristic approach. An example demonstrating use of TTS and a program flowchart…

  9. A Program Master Schedule Can Improve Results

    Science.gov (United States)

    2014-02-01

    A Program Master Schedule Can Improve Results Patrick K. Barker “There cannot be a crisis today; my schedule is already full.” — Henry Kissinger...briefings, so PMOs often rely on static pictures and Gantt charts available on presentation software such as Microsoft PowerPoint. That’s fine—and

  10. Improved MLWDF scheduler for LTE downlink transmission

    Science.gov (United States)

    Obinna Nnamani, Christantus; Anioke, Chidera Linda; Ikechukwu Ani, Cosmas

    2016-11-01

    In long-term evolution (LTE) downlink transmission, modified least weighted delay first (MLWDF) scheduler is a quality of service (QoS) aware scheduling scheme for real-time (RT) services. Nevertheless, MLWDF performs below optimal among the trade-off between strict delay and loss restraints of RT and non-RT traffic flows, respectively. This is further worsened with the implementation of hybrid automatic retransmission request (HARQ). As these restraints grow unabated with increasing number of user demands, the performance of MLWDF further reduces. In order to ameliorate this situation, there is a need to directly incorporate the variations in user demands and HARQ implementation as parameters to the MLWDF scheduler. In this work, an improvement to the MLWDF scheduler is proposed. The improvement entails adding two novel parameters that characterise user demand and HARQ implementation. The scheduler was tested using varying three classes of service in QoS class identifiers (QCIs) table standardised by Third Generation Partnership Project for LTE network to characterise different services. It was also tested on the basis of packet prioritisation. The proposed scheduler was simulated with LTE-SIM simulator and compared with the MLWDF and proportional fairness schedulers. In terms of delay, throughput and packet loss ratio; the proposed scheduler increased overall system performance.

  11. Corrosion Tracking and Prediction for C-141A Aircraft Maintenance Scheduling

    Science.gov (United States)

    1978-04-01

    corporation, or conveying any rights or permission to manufacture, use, or sell any patented invention that may in any way be related thereto. This...presents the results of a t-test for the sig- fincance of difference between means for the data of Figure 17. The estimate for the mean is given at the

  12. Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks

    Directory of Open Access Journals (Sweden)

    Ronald Díaz-Cazaña

    2014-01-01

    Full Text Available El análisis simultáneo de la programación de la producción y la s tareas de mantenimiento preventivo atrae especial atención en los investigadores debido a su gran complejidad y por ende la neces idad de encontrar métodos eficientes para resolver este tipo de problema combinatorio. Este artículo presenta un enfoque heurístico para resolver dicha problemática en plantas tipo job-shop . El método de solución incluye un modelo de programación lineal inspirado en el proble ma del Agente Vendedor, donde el tiempo de iniciación es consid erado como métrica de distancia. El método persigue obtener una secue ncia de las órdenes de producción y tareas de mantenimiento pre ventivo que reduzcan el tiempo ocioso y los retrasos simultáneamente, c umpliendo con el programa de mantenimiento. Luego de encontrar la solución óptima para cada máquina, un factor de corrección ( CF es determinado como la nueva medida de distancia. El factor CF considera la estructura inicial de solución, la utilización de las máquin as y las prioridades en los productos. De esta forma, la soluci ón final es alcanzada solucionando el modelo de programación lineal usando los valores de distancia actualizados. Finalmente, la heurístic a propuesta es aplicada en un caso de estudio real de la Industria Cubana. Los resultados experimentales indicaron una reducción significa tiva del tiempo ocioso para la compañía objeto de estudio.

  13. Optimal Preventive Maintenance Schedule based on Lifecycle Cost and Time-Dependent Reliability

    Science.gov (United States)

    2011-11-10

    cost PC , the inspection cost IC and an expected variable cost EVC [2, 32]. These costs are a function of quality and reliability. The lifecycle...expected variable cost EVC is a function of the time- dependent reliability which is used to estimate the expected present value of repairing and/or

  14. A Prognostic Method for Scheduling Maintenance on the P2- Marx Modulator

    Energy Technology Data Exchange (ETDEWEB)

    Benwell, Andrew; Burkhart, Craig; Kemp, Mark; Macken, Koen; Nguyen, Minh; MacNair, Dave; Olsen, Jeff; Larsen, Ray; /SLAC

    2010-06-10

    The SLAC National Accelerator Laboratory is developing a second generation Marx-type modulator for the ILC, the P2-Marx. The modulator is expected to operate reliably in excess of 10{sup 5} hours with minimum downtime. A prognostic system is being implemented with the development of the P2-Marx to monitor and track the health of key high voltage components. This paper discusses the way in which the prognostic system will be implemented and used to monitor the health of the P2-Marx modulator.

  15. FFTF and Advanced Reactors Transition Program Resource Loaded Schedule

    Energy Technology Data Exchange (ETDEWEB)

    GANTT, D.A.

    2000-10-31

    This Resource Load Schedule (RLS) addresses two missions. The Advanced Reactors Transition (ART) mission, funded by DOE-EM, is to transition assigned, surplus facilities to a safe and compliant, low-cost, stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D&D. Facilities to be transitioned include the 309 Building Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy Legacy facilities. This mission is funded through the Environmental Management (EM) Project Baseline Summary (PBS) RL-TP11, ''Advanced Reactors Transition.'' The second mission, the Fast Flux Test Facility (FFTF) Project, is funded through budget requests submitted to the Office of Nuclear Energy, Science and Technology (DOE-NE). The FFTF Project mission is maintaining the FFTF, the Fuels and Materials Examination Facility (FMEF), and affiliated 400 Area buildings in a safe and compliant standby condition. This mission is to preserve the condition of the plant hardware, software, and personnel in a manner not to preclude a plant restart. This revision of the Resource Loaded Schedule (RLS) is based upon the technical scope in the latest revision of the following project and management plans: Fast Flux Test Facility Standby Plan (Reference 1); Hanford Site Sodium Management Plan (Reference 2); and 309 Building Transition Plan (Reference 4). The technical scope, cost, and schedule baseline is also in agreement with the concurrent revision to the ART Fiscal Year (FY) 2001 Multi-Year Work Plan (MYWP), which is available in an electronic version (only) on the Hanford Local Area Network, within the ''Hanford Data Integrator (HANDI)'' application.

  16. Maintenance performance improvement with System Dynamics: A Corrective Maintenance showcase

    OpenAIRE

    Deenen, R.E.M.; Van Daalen, C.E.; Koene, E.G.C.

    2008-01-01

    This paper presents a case study of an analysis of a Corrective Maintenance process to realize performance improvement. The Corrective Maintenance process is supported by SAP, which has indicated the performance realisation problem. System Dynamics is used in a Group Model Building process to structure the problem and to develop a dynamic business model with which the process is analysed. This is performed by the evaluation of changes in external factors and interventions in the process on pe...

  17. Maintenance and Revitalization of Gallo

    DEFF Research Database (Denmark)

    Nolan, J. Shaun

    2018-01-01

    This chapter examines the current state of maintenance and revitalization of eastern Brittany’s Oïl language variety, Gallo. Following a description of the sociolinguistic context of regional languages in France today, this chapter focuses on maintenance and revitalization efforts for Gallo. Gallo...... promotion organizations comprising teachers, linguists, enthusiasts, and activists are working hard at a local and regional level to ensure that there is a greater awareness of the existence of this language variety and to foster an appreciation of the importance of its maintenance and revitalization...

  18. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Since the lowering of YB0 in February, less spectacular but nonetheless crucial progress has been made along the critical path to CMS completion. The YB0 has been aligned with the beamline to a fraction of a mm, and the HCAL has been fully installed. Cabling scaffolding for YB0 services has been built and one half (-z end) of the ECAL barrel has been installed. The YB0 services installation has begun, with two of the major technical challenges delaying bulk installation, namely PP1 detailed design, manufacture and installation plus Tracker cooling pipe insulation, now apparently solved. Significant difficulties in detailed design, integration and procurement of cable ducts remain. Despite this, the design of the +end is close to complete, and Tracker power cable installation on two sectors of the +end is well advanced. A new master schedule, v36.0, is being prepared to account for the updated actual situation at point 5 and for the revised LHC machine planning. Safety The enormous amount of...

  19. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  20. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction and Schedule After nearly seven months of concentrated effort, the installation of services on YB0 moved off the CMS critical path in late November. In line with v36 planning provisions, the additional time needed to finish this challeng¬ing task was accommodated by reducing sequential dependencies between assembly tasks, putting more tasks (especially heavy logistic movements) in parallel with activities on, or within, the central wheel. Thus the lowering of wheels YB-1 and YB -2 and of disk YE-3 is already complete, the latter made possible, in the shadow of YB0 work, by inverting the order of the 3 endcap disks in the surface building. Weather conditions permitting, the Tracker will be transported to point 5 during CMS week for insertion in EB before CERN closes. The lowering of the last two disks will take place mid- and end-of January, respectively. Thus central beampipe installation can be confidently planned to start in February as foreseen, allowing closure of CMS in time for CRA...

  1. Development of an Irrigation Scheduling Model

    Directory of Open Access Journals (Sweden)

    BAKHSHAL KHAN LASHARI

    2010-10-01

    Full Text Available This paper presents an irrigation scheduling software named ?Mehran Model? which computes reference evapotranspiration (ETo using FAO-56 Penman Monteith method and crop evapotranspiration (ETc by dual crop coefficients. The model can develop irrigation schedules for sixty-six crop types using soil and water balance approach. The model distinguishes soil texture classes, irrigation methods, and designs real time irrigation schedule for a crop using daily weather data of a reference site. The Mehran Model also includes planning on demand basis as well as rotational (warabandi irrigation schedules, and synchronizes both systems as well. The model has been field tested and validated on planning and management of irrigation schedules for cotton and wheat crops in Lower Indus Basin of Pakistan. Statistical analysis showed that the model at an average overestimated seasonal ETc of cotton and wheat crop by 2.41% and 4.31% respectively.

  2. Production scheduling with ant colony optimization

    Science.gov (United States)

    Chernigovskiy, A. S.; Kapulin, D. V.; Noskova, E. E.; Yamskikh, T. N.; Tsarev, R. Yu

    2017-10-01

    The optimum solution of the production scheduling problem for manufacturing processes at an enterprise is crucial as it allows one to obtain the required amount of production within a specified time frame. Optimum production schedule can be found using a variety of optimization algorithms or scheduling algorithms. Ant colony optimization is one of well-known techniques to solve the global multi-objective optimization problem. In the article, the authors present a solution of the production scheduling problem by means of an ant colony optimization algorithm. A case study of the algorithm efficiency estimated against some others production scheduling algorithms is presented. Advantages of the ant colony optimization algorithm and its beneficial effect on the manufacturing process are provided.

  3. 14 CFR 135.425 - Maintenance, preventive maintenance, and alteration programs.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance, preventive maintenance, and... ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.425 Maintenance, preventive maintenance, and alteration programs. Each certificate holder shall have an inspection program and...

  4. 14 CFR 135.423 - Maintenance, preventive maintenance, and alteration organization.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance, preventive maintenance, and... ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.423 Maintenance, preventive maintenance, and alteration organization. (a) Each certificate holder that performs any of its...

  5. 14 CFR 121.365 - Maintenance, preventive maintenance, and alteration organization.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance, preventive maintenance, and..., Preventive Maintenance, and Alterations § 121.365 Maintenance, preventive maintenance, and alteration...), preventive maintenance, or alterations, and each person with whom it arranges for the performance of that...

  6. 14 CFR 121.377 - Maintenance and preventive maintenance personnel duty time limitations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance and preventive maintenance..., Preventive Maintenance, and Alterations § 121.377 Maintenance and preventive maintenance personnel duty time limitations. Within the United States, each certificate holder (or person performing maintenance or preventive...

  7. 14 CFR 135.437 - Authority to perform and approve maintenance, preventive maintenance, and alterations.

    Science.gov (United States)

    2010-01-01

    ... maintenance, preventive maintenance, and alterations. 135.437 Section 135.437 Aeronautics and Space FEDERAL... AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.437 Authority to perform and approve maintenance, preventive maintenance, and alterations...

  8. 14 CFR 121.379 - Authority to perform and approve maintenance, preventive maintenance, and alterations.

    Science.gov (United States)

    2010-01-01

    ... maintenance, preventive maintenance, and alterations. 121.379 Section 121.379 Aeronautics and Space FEDERAL... OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.379 Authority to perform and approve maintenance, preventive maintenance, and alterations. (a) A certificate holder may perform, or it may make...

  9. 14 CFR 121.375 - Maintenance and preventive maintenance training program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance and preventive maintenance... OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.375 Maintenance and preventive maintenance training program. Each...

  10. Chromatin replication and epigenome maintenance

    DEFF Research Database (Denmark)

    Alabert, Constance; Groth, Anja

    2012-01-01

    initiates, whereas the replication process itself disrupts chromatin and challenges established patterns of genome regulation. Specialized replication-coupled mechanisms assemble new DNA into chromatin, but epigenome maintenance is a continuous process taking place throughout the cell cycle. If DNA...

  11. Managing Custodial and Maintenance Staffs.

    Science.gov (United States)

    Fickes, Michael

    2001-01-01

    Presents some basic maintenance management techniques that can help schools meet their budgets, preserve staffing levels, meet productivity needs, and sustain quality services. Tips for staff recruitment, training, and retention are explored. (GR)

  12. Technology for Maintenance Procedure Validation

    National Research Council Canada - National Science Library

    Badler, Norman

    2001-01-01

    ...). The period of research covered activities from January 2000 through January 2001. The primary objective of this research was to explore the feasibility of validating aircraft maintenance procedures using human models...

  13. Evaluation of preventive maintenance treatments.

    Science.gov (United States)

    2012-04-01

    Scrub seals were placed in 2007 in Tallahatchie, Marshall, Carroll and Grenada Counties to evaluate their effectiveness and feasibility as preventive maintenance treatments. Condition data was collected and evaluated on the project sections.

  14. Preventative maintenance program for bridges.

    Science.gov (United States)

    2015-07-01

    The Kentucky Transportation Cabinets (KYTC) bridge inventory is rapidly aging. As such, the Cabinet : needs to identify and implement relevant preventative maintenance (PM) actions to extend the useful : service lives of those structures. Maintena...

  15. Quality standard of aircraft maintenance

    Directory of Open Access Journals (Sweden)

    Боузаієнне Меккі бен Салем

    2005-01-01

    Full Text Available  The question of the account of operation conditions of an aeronautical engineering in airlines is considered at formation and a correcting of plans on aircrafts park maintenance.

  16. General Healthcare Maintenance of IBD

    Science.gov (United States)

    ... Share It is important to continue general health maintenance. While working with your gastroenterologist, also remember to speak with your primary care health care provider about other important issues including: Vaccinations: Adults with IBD should generally follow ...

  17. Measurements for winter road maintenance

    OpenAIRE

    Riehm, Mats

    2012-01-01

    Winter road maintenance activities are crucial for maintaining the accessibility and traffic safety of the road network at northerly latitudes during winter. Common winter road maintenance activities include snow ploughing and the use of anti-icing agents (e.g. road salt, NaCl). Since the local weather is decisive in creating an increased risk of slippery conditions, understanding the link between local weather and conditions at the road surface is critically important. Sensors are commonly i...

  18. Centralized mission planning and scheduling system for the Landsat Data Continuity Mission

    Science.gov (United States)

    Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki

    2014-01-01

    Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.

  19. Modeling Spare Parts Demands Forecast under Two-Dimensional Preventive Maintenance Policy

    Directory of Open Access Journals (Sweden)

    Qiwei Hu

    2015-01-01

    Full Text Available In maintenance practice, there is such a situation where the spare parts replacement should be carried out at the scheduling time of calendar or usage for whichever comes first. The issue of two-dimensional preventive maintenance usually was not addressed by traditional methods, and at present, few studies were focused on this very topic. Based on these considerations, this paper presented the two-dimensional preventive policy where replacements of spare parts are based on both calendar time and usage time. A novel model was developed to forecast spare parts demands under two-dimensional preventive maintenance policy, and a discrete algorithm was presented for solving the mathematical model. A case study was given to demonstrate its applicability and validity, and it was showed that the presented model can be used to forecast spare parts demands as well as to optimize spare parts and preventive maintenance jointly.

  20. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  1. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  2. Downlink Scheduling for Multiclass Traffic in LTE

    Directory of Open Access Journals (Sweden)

    Madan Ritesh

    2009-01-01

    Full Text Available We present a design of a complete and practical scheduler for the 3GPP Long Term Evolution (LTE downlink by integrating recent results on resource allocation, fast computational algorithms, and scheduling. Our scheduler has low computational complexity. We define the computational architecture and describe the exact computations that need to be done at each time step (1 milliseconds. Our computational framework is very general, and can be used to implement a wide variety of scheduling rules. For LTE, we provide quantitative performance results for our scheduler for full buffer, streaming video (with loose delay constraints, and live video (with tight delay constraints. Simulations are performed by selectively abstracting the PHY layer, accurately modeling the MAC layer, and following established network evaluation methods. The numerical results demonstrate that queue- and channel-aware QoS schedulers can and should be used in an LTE downlink to offer QoS to a diverse mix of traffic, including delay-sensitive flows. Through these results and via theoretical analysis, we illustrate the various design tradeoffs that need to be made in the selection of a specific queue-and-channel-aware scheduling policy. Moreover, the numerical results show that in many scenarios strict prioritization across traffic classes is suboptimal.

  3. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  4. Maintenance strategy for tilting table of rolling mill based on reliability considerations

    Energy Technology Data Exchange (ETDEWEB)

    Deshpande, V.S.; Modak, J.P

    2003-04-01

    tilting tables are 14 scheduled on-condition tasks, 10 scheduled on-restoration tasks, seven scheduled discard task. Whereas for 14 failure modes no scheduled maintenance has been proposed. Existing maintenance schedule for tilting tables indicates the maintenance action as and when required. Hence RCM based schedule specifies that additional preventive maintenance tasks need to be executed as compared to none initially. Cost incurred for this can be offset from the savings accrued from reduction in loss of production due to repetitive breakdowns. The methodology of RCM adopted in western industries cannot be applied as it is to Indian industries because of labour oriented nature, partially computerised information systems, non-availability of the information about cost of loss of production due to breakdown and age-reliability pattern of equipment, insufficient maintenance database. These problems can be overcome by development of sound MMIS, formulation of RCM review group and imparting suitable training to acquire the relevant skills in RCM. Thus RCM methodology can be applied to Indian industry for reduction of breakdowns as well as optimisation of preventive maintenance cost. This can further boost up the prospects of Indian industry to offer the products at globally competitive prices.

  5. Simultaneous scheduling of machines and mobile robots

    DEFF Research Database (Denmark)

    Dang, Vinh Quang; Nielsen, Izabela Ewa

    2013-01-01

    in terms of their advanced ability to perform tasks at machines by using their manipulation arms. The mobile robots thus have to be scheduled in relation to scheduling of machines so as to increase the efficiency of the overall system. The performance criterion is to minimize time required to complete all......This paper deals with the problem of simultaneously scheduling machines and a number of autonomous mobile robots in a flexible manufacturing system (FMS). Besides capability of transporting materials between machines, the considered mobile robots are different from other material handling devices...

  6. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...

  7. Starshade Observation Scheduling for WFIRST

    Science.gov (United States)

    Soto, Gabriel; Garrett, Daniel; Delacroix, Christian; Savransky, Dmitry

    2018-01-01

    An exoplanet direct imaging mission can employ an external starshade for starlight suppression to achieve higher contrasts and potentially higher throughput than with an internal coronagraph. This separately-launched starshade spacecraft is assumed to maintain a single, constant separation distance from the space telescope—for this study, the Wide Field Infrared Survey Telescope (WFIRST)—based on a designated inner working angle during integration times. The science yield of such a mission can be quantified using the Exoplanet Open-Source Imaging Simulator (EXOSIMS): this simulator determines the distributions of mission outcomes, such as the types and amount of exoplanet detections, based on ensembles of end-to-end simulations of the mission. This study adds a starshade class to the survey simulation module of EXOSIMS and outlines a method for efficiently determining observation schedules. The new starshade class solves boundary value problems using circular restricted three-body dynamics to find fast, high-accuracy estimates of the starshade motion while repositioning between WFIRST observations. Fuel usage dictates the mission lifetime of the starshade given its limited fuel supply and is dominated by the Δv used to reposition the starshade between the LOS of different targets; the repositioning time-of-flight is kept constant in this study. A starshade burns less fuel to reach certain target stars based on their relative projected positions on a skymap; other targets with costly transfers can be filtered out to increase the starshade mission duration. Because the initial target list can consist of nearly 2000 stars, calculating the Δv required to move the starshade to every other star on the target list would be too computationally expensive and renders running ensembles of survey simulations infeasible. Assuming the starshade begins its transfer at the LOS of a certain star, a Δv curve is approximated for the remaining target stars based on their right

  8. Physician Fee Schedule Carrier Specific Files

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) has condensed all 56 Physician Fee Schedule (PFS) carrier specific pricing files into one zip file. It is...

  9. Oversubscribed Mission Scheduler Conflict Resolution System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The allocation and scheduling of limited communication assets to an increasing number of satellites and other spacecraft remains a complex and challenging problem....

  10. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    . In this paper, we propose a novel nonblocking scheduling mechanism that is used prior to the actual service invocations. Its aim is to reach an agreement between the client and all participating providers on what transaction processing times have to be expected, accepted, and guaranteed. This enables service......For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...... schedulers of service providers typically do take into account neither time constraints for committing the whole transaction, nor the individual services' constraints when scheduling decisions are made. This often leads to an unnecessary blocking of transactions by (possibly long-running) others...

  11. A Scheduling Problem in the Baking Industry

    National Research Council Canada - National Science Library

    da Silva, Felipe Augusto Moreira; Moretti, Antonio Carlos; de Azevedo, Anibal Tavares

    2014-01-01

      This paper addresses a scheduling problem in an actual industrial environment of a baking industry where production rates have been growing every year and the need for optimized planning becomes...

  12. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig......, interior point stabilization is used to decrease the number of columns generated in the branch-and-price algorithm. The algorithm is experimentally evaluated on job scheduling instances for a Grid network. The Dantzig- Wolfe algorithm with stabilization is clearly superior, being able to solve large...

  13. Job Scheduling in a Heterogeneous Grid Environment

    Science.gov (United States)

    Shan, Hong-Zhang; Smith, Warren; Oliker, Leonid; Biswas, Rupak

    2004-01-01

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  14. Courts, Scheduled Damages, and Medical Malpractice Insurance

    DEFF Research Database (Denmark)

    Bertoli, Paola; Grembi, Veronica

    We assess the impact of the introduction of schedules of non-economic damages (i.e. tiered caps systems) on the behavior of insurers operating in the medical liability market for hospitals while controlling the performance of the judicial system, measured as court backlog. Using a difference......-in-differences strategy on Italian data, we find that the introduction of schedules increases the presence of insurers (i.e. medical liability market attractiveness) only in inefficient judicial districts. In the same way, court inefficiency is attractive to insurers for average values of schedules penetration...... of the market, with an increasing positive impact of inefficiency as the territorial coverage of schedules increases. Finally, no significant impact is registered on paid premiums. Our analysis sheds light on a complex set of elements affecting the decisions of insurers in malpractice markets. The analysis...

  15. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  16. Onboard Autonomous Scheduling Intelligence System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Scheduling the daily activities of the crew on a human space mission is currently a cumbersome job performed by a large team of operations experts on the ground....

  17. Partially clairvoyant scheduling for aggregate constraints

    Directory of Open Access Journals (Sweden)

    K. Subramani

    2005-01-01

    constraints. In this paper, we extend the class of constraints for which partially clairvoyant schedules can be determined efficiently, to include aggregate constraints. Aggregate constraints form a strict superset of standard constraints and can be used to model performance metrics.

  18. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  19. Schedule Sales Query Report Generation System

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  20. A Cyclical Nurse Schedule Using Goal Programming

    Directory of Open Access Journals (Sweden)

    Ruzzakiah Jenal

    2011-11-01

    Full Text Available Scheduling is a very tedious task in organizations where duty is around the clock. Constructing timetable for nurses in hospital is one of the challenging jobs for the head nurse or nurse manager. It requires a lot of time to spend for generating a good and fair timetable. Thus, in this study, we propose a cyclical nurse scheduling model using a 0-1 goal programming that would help the head nurse or nurse manager to have less effort on building new schedules periodically. The proposed model satisfies the stated hospital’s policies and the nurses’ preferences. The result obtained from this model gives an optimal solution where all goals are achieved. The model also provides an unbiased way of scheduling the nurses and thus leads to an overall higher satisfaction and fairness to the nurses and the hospital management.

  1. Firefighter Shift Schedules Affect Sleep Quality.

    Science.gov (United States)

    Billings, Joel; Focht, Will

    2016-03-01

    The aim of this study was to investigate the prevalence and severity of firefighter sleep quality across department shift schedules. Sleep quality was assessed using a Pittsburgh Sleep Quality Index in a sample of 109 male career firefighters from six fire departments in three Southwestern US states. The three shift schedules studied were 24on/48off, 48on/96off, and Kelly. Seventy-three percent of firefighters report poor sleep quality. The 24on/48off shift schedule is associated with the best sleep quality and Kelly is associated with the worst sleep quality. Firefighters working second jobs report significantly poorer sleep quality than those who do not. Shift schedules that disrupt normal circadian rhythms more result in poorer sleep quality, which can lead to less effective emergency response and increased risk to firefighter health and safety.

  2. Multiobjective Optimization of Aircraft Maintenance in Thailand Using Goal Programming: A Decision-Support Model

    Directory of Open Access Journals (Sweden)

    Yuttapong Pleumpirom

    2012-01-01

    Full Text Available The purpose of this paper is to develop the multiobjective optimization model in order to evaluate suppliers for aircraft maintenance tasks, using goal programming. The authors have developed a two-step process. The model will firstly be used as a decision-support tool for managing demand, by using aircraft and flight schedules to evaluate and generate aircraft-maintenance requirements, including spare-part lists. Secondly, they develop a multiobjective optimization model by minimizing cost, minimizing lead time, and maximizing the quality under various constraints in the model. Finally, the model is implemented in the actual airline's case.

  3. Maintenance therapy in multiple myeloma

    Directory of Open Access Journals (Sweden)

    Jean-Luc Harousseau

    2009-08-01

    Full Text Available The treatment of multiple myeloma (MM has changed dramatically in the past twenty years with the introduction of high-dose therapy plus autologous stem-cell transplantation (ASCT in younger patients and, more recently, of three novel agents (thalidomide, bortezomib, and lenalidomide. When conventional chemotherapy was the only available possibility, complete responses (CR were very rare and the objective of maintenance was to prolong remission duration by continuing the same type of treatment that induced the initial response. With recent therapeutic improvements, CR achievement becomes a realistic goal that, in most cases, is significantly correlated with the outcome (1. Therefore, both the nature and the impact of maintenance therapy have changed. Maintenance therapy is based currently on novel agents, and its objective is not only to control the clone but also to further decrease the tumor burden and improve the quality of response. A number of randomized studies show a benefit from maintenance therapy with novel agents (until now, mostly thalidomide, at least in terms of response rate and progression-free survival (PFS. However, there is still a debate as concerns the impact on overall survival (OS and the optimal administration of maintenance therapy.

  4. Design Support for Maintenance Tasks using TRIZ

    NARCIS (Netherlands)

    Vaneker, Thomas H.J.; van Diepen, T.

    2016-01-01

    Design for Maintenance is a method to optimize maintenance activities during the design process. To help maintenance engineers, the chair Maintenance Engineering at the University of Twente has set up a list of 37 guidelines. However, these guidelines only state the goal that should be achieved, but

  5. 23 CFR 633.208 - Maintenance.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Maintenance. 633.208 Section 633.208 Highways FEDERAL... PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.208 Maintenance. Maintenance of all highway... responsibility of the State. The State may arrange for maintenance of such roads or portions thereof, by...

  6. 46 CFR 185.702 - Maintenance.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Maintenance. 185.702 Section 185.702 Shipping COAST...) OPERATIONS Operational Readiness, Maintenance, and Inspection of Lifesaving Equipment § 185.702 Maintenance. (a) The manufacturer's instructions for onboard maintenance of survival craft, rescue boats, and...

  7. 46 CFR 122.702 - Maintenance.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Maintenance. 122.702 Section 122.702 Shipping COAST..., Maintenance, and Inspection of Lifesaving Equipment § 122.702 Maintenance. (a) The manufacturer's instructions for onboard maintenance of survival craft, rescue boats, and launching appliances, manufactured on or...

  8. 18 CFR 367.81 - Maintenance.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Maintenance. 367.81... Expense Instructions § 367.81 Maintenance. (a) The cost of maintenance chargeable to the various operating... maintenance work. A list of work operations applicable generally to service company property is included in...

  9. Selective Maintenance Model Considering Time Uncertainty

    OpenAIRE

    Le Chen; Zhengping Shu; Yuan Li; Xuezhi Lv

    2012-01-01

    This study proposes a selective maintenance model for weapon system during mission interval. First, it gives relevant definitions and operational process of material support system. Then, it introduces current research on selective maintenance modeling. Finally, it establishes numerical model for selecting corrective and preventive maintenance tasks, considering time uncertainty brought by unpredictability of maintenance procedure, indetermination of downtime for spares and difference of skil...

  10. Lifetime oriented maintenance planning in the Netherlands

    NARCIS (Netherlands)

    Straub, A.

    2003-01-01

    In this paper we set up a framework for lifetime oriented maintenance planning as an outcome and input for strategic housing stock management. The maintenance planning holds maintenance activities and costs in the longer term. We consider the maintenance planning as a tool to calculate and implement

  11. Feedback Scheduling: An Event-Driven Paradigm

    OpenAIRE

    Xia, Feng; Tian, Guosong; Sun, Youxian

    2008-01-01

    Embedded computing systems today increasingly feature resource constraints and workload variability, which lead to uncertainty in resource availability. This raises great challenges to software design and programming in multitasking environments. In this paper, the emerging methodology of feedback scheduling is introduced to address these challenges. As a closed-loop approach to resource management, feedback scheduling promises to enhance the flexibility and resource efficiency of various sof...

  12. Advanced Reactors Transition Program Resource Loaded Schedule

    Energy Technology Data Exchange (ETDEWEB)

    GANTT, D.A.

    2000-01-12

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FETF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This revision reflects the 19 Oct 1999 baseline.

  13. Advanced Reactors Transition Program Resource Loaded Schedule

    Energy Technology Data Exchange (ETDEWEB)

    BOWEN, W.W.

    1999-11-08

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FFTF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This document reflects the 1 Oct 1999 baseline.

  14. Synchronized sweep algorithms for scalable scheduling constraints

    OpenAIRE

    Letort, Arnaud; Carlsson, Mats; Beldiceanu, Nicolas

    2013-01-01

    This report introduces a family of synchronized sweep based filtering algorithms for handling scheduling problems involving resource and precedence constraints. The key idea is to filter all constraints of a scheduling problem in a synchronized way in order to scale better. In addition to normal filtering mode, the algorithms can run in greedy mode, in which case they perform a greedy assignment of start and end times. The filtering mode achieves a significant speed-up over ...

  15. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM-based sched...... should be prioritized and coordinated with each craft, a process library should be introduced to promote transfer of knowledge and continuous improvements, and information flow between design and scheduling processes must change from push to pull....

  16. Maritime wideband communication networks video transmission scheduling

    CERN Document Server

    Yang, Tingting

    2014-01-01

    This Springer Brief covers emerging maritime wideband communication networks and how they facilitate applications such as maritime distress, urgency, safety and general communications. It provides valuable insight on the data transmission scheduling and protocol design for the maritime wideband network. This brief begins with an introduction to maritime wideband communication networks including the architecture, framework, operations and a comprehensive survey on current developments. The second part of the brief presents the resource allocation and scheduling for video packet transmission wit

  17. Revised data taking schedule with ion beams

    CERN Document Server

    Gazdzicki, Marek; Aduszkiewicz, A; Andrieu, B; Anticic, T; Antoniou, N; Argyriades, J; Asryan, A G; Baatar, B; Blondel, A; Blumer, J; Boldizsar, L; Bravar, A; Brzychczyk, J; Bubak, A; Bunyatov, S A; Choi, K U; Christakoglou, P; Chung, P; Cleymans, J; Derkach, D A; Diakonos, F; Dominik, W; Dumarchez, J; Engel, R; Ereditato, A; Feofilov, G A; Fodor, Z; Ferrero, A; Gazdzicki, M; Golubeva, M; Grebieszkow, K; Grzeszczuk, A; Guber, F; Hasegawa, T; Haungs, A; Igolkin, S; Ivanov, A S; Ivashkin, A; Kadija, K; Katrynska, N; Kielczewska, D; Kikola, D; Kisiel, J; Kobayashi, T; Kolesnikov, V I; Kolev, D; Kolevatov, R S; Kondratiev, V P; Kowalski, S; Kurepin, A; Lacey, R; Laszlo, A; Lyubushkin, V V; Majka, Z; I Malakhov, A; Marchionni, A; Marcinek, A; Maris, I; Matveev, V; Melkumov, G L; Meregaglia, A; Messina, M; Mijakowski, P; Mitrovski, M; Montaruli, T; Mrówczynski, St; Murphy, S; Nakadaira, T; Naumenko, P A; Nikolic, V; Nishikawa, K; Palczewski, T; Pálla, G; Panagiotou, A D; Peryt, W; Planeta, R; Pluta, J; Popov, B A; Posiadala, M; Przewlocki, P; Rauch, W; Ravonel, M; Renfordt, R; Röhrich, D; Rondio, E; Rossi, B; Roth, M; Rubbia, A; Rybczynski, M; Sadovskii, A; Sakashita, K; Schuster, T; Sekiguchi, T; Seyboth, P; Shibata, M; Sissakian, A N; Skrzypczak, E; Slodkowski, M; Sorin, A S; Staszel, P; Stefanek, G; Stepaniak, J; Strabel, C; Ströbele, H; Susa, T; Szentpétery, I; Szuba, M; Tada, M; Taranenko, A; Tsenov, R; Ulrich, R; Unger, M; Vassiliou, M; Vechernin, V V; Vesztergombi, G; Wlodarczyk, Z; Wojtaszek, A; Zipper, W; CERN. Geneva. SPS and PS Experiments Committee; SPSC

    2009-01-01

    This document presents the revised data taking schedule of NA61 with ion beams. The revision takes into account limitations due to the new LHC schedule as well as final results concerning the physics performance with secondary ion beams. It is proposed to take data with primary Ar and Xe beams in 2012 and 2014, respectively, and to test and use for physics a secondary B beam from primary Pb beam fragmentation in 2010, 2011 and 2013.

  18. A STEPPING STONE TOWARDS KNOWLEDGE BASED MAINTENANCE

    Directory of Open Access Journals (Sweden)

    G. Waeyenbergh

    2012-01-01

    Full Text Available Maintenance decision making becomes more and more a management concern. Some decades ago, maintenance was still often considered as an unavoidable side effect of production. The perception of maintenance has evolved considerably. One of the current issues is the maintenance concept, being the mix of maintenance interventions and the general framework for determining this mix. In this paper we describe a modular framework, called Knowledge Based Maintenance, for developing a customised maintenance concept. After describing the general framework and its decision support use, some case experiences are given. This experience covers some elements of the proposed framework.

  19. An approach to process production reactive scheduling.

    Science.gov (United States)

    Hauptman, Bostjan; Jovan, Vladimir

    2004-04-01

    Process manufacturing has some characteristics that make it different from other types of industry. In practice, there are many examples of process industrial settings where production resources are shared and there is no intermediate storage between two processing units. Perhaps the most important issue usually to be excluded from the academic discussion of process production scheduling/control problems is the uncertainty of the duration of real chemical processes. These properties of process manufacturing result in blocking, no-wait, and other constraints that must be taken into account during designing the production scheduling system. The first part of the paper addresses some features of process manufacturing and their influence on production scheduling. The main part of the paper analyzes the scheduling problems under the presence of typical process constraints and unpredictable process duration times and introduces a simple and reliable approach to avoid these problems. The proposed concept is presented on a case study of an industrial two-stage washing batch subprocess. It is considered that the presented approach would be relatively easy to implement in a process production scheduling system and that it can contribute to more effective process production scheduling.

  20. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  1. Chip Attach Scheduling in Semiconductor Assembly

    Directory of Open Access Journals (Sweden)

    Zhicong Zhang

    2013-01-01

    Full Text Available Chip attach is the bottleneck operation in semiconductor assembly. Chip attach scheduling is in nature unrelated parallel machine scheduling considering practical issues, for example, machine-job qualification, sequence-dependant setup times, initial machine status, and engineering time. The major scheduling objective is to minimize the total weighted unsatisfied Target Production Volume in the schedule horizon. To apply Q-learning algorithm, the scheduling problem is converted into reinforcement learning problem by constructing elaborate system state representation, actions, and reward function. We select five heuristics as actions and prove the equivalence of reward function and the scheduling objective function. We also conduct experiments with industrial datasets to compare the Q-learning algorithm, five action heuristics, and Largest Weight First (LWF heuristics used in industry. Experiment results show that Q-learning is remarkably superior to the six heuristics. Compared with LWF, Q-learning reduces three performance measures, objective function value, unsatisfied Target Production Volume index, and unsatisfied job type index, by considerable amounts of 80.92%, 52.20%, and 31.81%, respectively.

  2. Optimal Schedules in Multitask Motor Learning.

    Science.gov (United States)

    Lee, Jeong Yoon; Oh, Youngmin; Kim, Sung Shin; Scheidt, Robert A; Schweighofer, Nicolas

    2016-04-01

    Although scheduling multiple tasks in motor learning to maximize long-term retention of performance is of great practical importance in sports training and motor rehabilitation after brain injury, it is unclear how to do so. We propose here a novel theoretical approach that uses optimal control theory and computational models of motor adaptation to determine schedules that maximize long-term retention predictively. Using Pontryagin's maximum principle, we derived a control law that determines the trial-by-trial task choice that maximizes overall delayed retention for all tasks, as predicted by the state-space model. Simulations of a single session of adaptation with two tasks show that when task interference is high, there exists a threshold in relative task difficulty below which the alternating schedule is optimal. Only for large differences in task difficulties do optimal schedules assign more trials to the harder task. However, over the parameter range tested, alternating schedules yield long-term retention performance that is only slightly inferior to performance given by the true optimal schedules. Our results thus predict that in a large number of learning situations wherein tasks interfere, intermixing tasks with an equal number of trials is an effective strategy in enhancing long-term retention.

  3. Analysis of gain scheduled control for nonlinear plants

    Science.gov (United States)

    Shamma, Jeff S.; Athans, Michael

    1990-01-01

    Gain scheduling has proven to be a successful design methodology in many engineering applications. In the absence of a sound theoretical analysis, these designs come with no guarantees of the robustness, performance, or even nominal stability of the overall gain-scheduled design. An analysis is presented for two types of nonlinear gain-scheduled control systems: (1) scheduling on a reference trajectory and (2) scheduling on the plant output. Conditions which guarantee stability, robustness, and performance properties of the global gain schedule designs are given. These conditions confirm and formalize popular notions regarding gain-scheduled designs, such as that the scheduling variable should vary slowly and capture the plant's nonlinearities.

  4. Compliance improvement in periodontal maintenance

    Directory of Open Access Journals (Sweden)

    Verônica Franco de Carvalho

    2010-06-01

    Full Text Available OBJECTIVES: The aim of this study was to assess the infuence of efforts applied to modify the patients' behavior towards periodontal maintenance. MATERIAL AND METHODS: Patients were classifed into three groups: Complete Compliance (participation in all visits, Irregular Compliance (irregular participation, one or more missing appointments, and Noncompliance (abandoned or never returned to the program. Complete compliers received usual procedures of the maintenance visit. The irregular compliers and non-compliers received usual procedures and strategies such as reminding next visit, informing patients on both periodontal disease and importance of maintenance, motivating the patient who showed an improvement in compliance. Thus, 137 patients were observed for 12 months. RESULTS: The degree of compliance has increased signifcantly during this period (p=0.001. No association was detected between age or gender and compliance degree. CONCLUSIONS: The results have shown that the intervention applied had a favorable infuence on the patients' compliance.

  5. Compliance improvement in periodontal maintenance.

    Science.gov (United States)

    de Carvalho, Verônica Franco; Okuda, Osmar Shizuo; Bernardo, Carlos Cheque; Pannuti, Cláudio Mendes; Georgetti, Marco Antonio Paupério; De Micheli, Giorgio; Pustiglioni, Francisco Emílio

    2010-01-01

    The aim of this study was to assess the influence of efforts applied to modify the patients' behavior towards periodontal maintenance. Patients were classified into three groups: Complete Compliance (participation in all visits), Irregular Compliance (irregular participation, one or more missing appointments), and Noncompliance (abandoned or never returned to the program). Complete compliers received usual procedures of the maintenance visit. The irregular compliers and non-compliers received usual procedures and strategies such as reminding next visit, informing patients on both periodontal disease and importance of maintenance, motivating the patient who showed an improvement in compliance. Thus, 137 patients were observed for 12 months. The degree of compliance has increased significantly during this period (p=0.001). No association was detected between age or gender and compliance degree. The results have shown that the intervention applied had a favorable influence on the patients' compliance.

  6. Sensitivities in Structural Maintenance Planning

    DEFF Research Database (Denmark)

    Faber, Michael Havbro; Kroon, I.B.; Sørensen, John Dalsgaard

    1996-01-01

    A general description of optimal inspection and maintenance planning based on the classical decision theory and the modern reliability theory is given. A number of simplifications to this description is given leading to more appropriate formulations for practical applications. Sensitivities of both...... optimal inspection and maintenance plans as well as the associated costs are given with respect to the assumptions on which the planning has been performed. These sensitivities indicate the significance of the individual assumptions and may be used as a decision tool to reject particular optimal...... inspection and maintenance plans showing too large sensitivity. An example from the offshore industry is given to indicate how the methodologies can be used in practical applications....

  7. Diverless maintenance in deep water

    Energy Technology Data Exchange (ETDEWEB)

    Hals, B.E. [Oceaneering International Services, (United Kingdom)

    1996-12-31

    The topic of diverless maintenance will address subsea production facilities in this paper. The major factors that determine diverless maintainability are development economics, maintenance philosophy, subsea hardware design, subsea intervention hardware, and compatibility of subsea hardware and remote work capabilities. The opportunity for developing and implementing low cost diverless installable and maintenable subsea facilities exist. Designs, hardwares, and procedures exist althoughmany of these have been combined into powerful solutions. This paper addresses the issues that need to be considered and provides one set of solutions. There are a number of other solutions that can be combined in a different set to provide a parallel but different solution. The challenge is to establish a process that defines the requirement, identifies the resources/capabilities, executes the work. 3 refs., 10 figs.

  8. Enabling a New Planning and Scheduling Paradigm

    Science.gov (United States)

    Jaap, John; Davis, Elizabeth

    2004-01-01

    The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models

  9. Corrosion Sensor Development for Condition-Based Maintenance of Aircraft

    Directory of Open Access Journals (Sweden)

    Gino Rinaldi

    2012-01-01

    Full Text Available Aircraft routinely operate in atmospheric environments that, over time, will impact their structural integrity. Material protection and selection schemes notwithstanding, recurrent exposure to chlorides, pollution, temperature gradients, and moisture provide the necessary electrochemical conditions for the development and profusion of corrosion in aircraft structures. For aircraft operators, this becomes an important safety matter as corrosion found in a given aircraft must be assumed to be present in all of that type of aircraft. This safety protocol and its associated unscheduled maintenance requirement drive up the operational costs of the fleet and limit the availability of the aircraft. Hence, there is an opportunity at present for developing novel sensing technologies and schemes to aid in shifting time-based maintenance schedules towards condition-based maintenance procedures. In this work, part of the ongoing development of a multiparameter integrated corrosion sensor is presented. It consists of carbon nanotube/polyaniline polymer sensors and commercial-off-the-shelf sensors. It is being developed primarily for monitoring environmental and material factors for the purpose of providing a means to more accurately assess the structural integrity of aerospace aluminium alloys through fusion of multiparameter sensor data. Preliminary experimental test results are presented for chloride ion concentration, hydrogen gas evolution, humidity variations, and material degradation.

  10. Fault maintenance trees: reliability centered maintenance via statistical model checking

    NARCIS (Netherlands)

    Ruijters, Enno Jozef Johannes; Guck, Dennis; Drolenga, Peter; Stoelinga, Mariëlle Ida Antoinette

    The current trend in infrastructural asset management is towards risk-based (a.k.a. reliability centered) maintenance, promising better performance at lower cost. By maintaining crucial components more intensively than less important ones, dependability increases while costs decrease. This requires

  11. An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

    Science.gov (United States)

    Moore, J. E.

    1975-01-01

    An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

  12. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  13. Optimal scheduling of biocide dosing for seawater-cooled power and desalination plants

    KAUST Repository

    Mahfouz, Abdullah Bin

    2011-02-13

    Thermal desalination systems are typically integrated with power plants to exploit the excess heat resulting from the power-generation units. Using seawater in cooling the power plant and the desalination system is a common practice in many parts of the world where there is a shortage of freshwater. Biofouling is one of the major problems associated with the usage of seawater in cooling systems. Because of the dynamic variation in the power and water demands as well as the changes in the characteristics of seawater and the process, there is a need to develop an optimal policy for scheduling biocide usage and cleaning maintenance of the heat exchangers. The objective of this article is to introduce a systematic procedure for the optimization of scheduling the dosing of biocide and dechlorination chemicals as well as cleaning maintenance for a power production/thermal desalination plant. A multi-period optimization formulation is developed and solved to determine: the optimal levels of dosing and dechlorination chemicals; the timing of maintenance to clean the heat-exchange surfaces; and the dynamic dependence of the biofilm growth on the applied doses, the seawater-biocide chemistry, the process conditions, and seawater characteristics for each time period. The technical, economic, and environmental considerations of the system are accounted for. A case study is solved to elucidate the applicability of the developed optimization approach. © 2011 Springer-Verlag.

  14. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Malmqvist, Stefan; Leboeuf-Yde, Charlotte

    2009-01-01

    Maintenance care is a well known concept among chiropractors, although there is little knowledge about its exact definition, its indications and usefulness. As an initial step in a research program on this phenomenon, it was necessary to identify chiropractors' rationale for their use of maintena......Maintenance care is a well known concept among chiropractors, although there is little knowledge about its exact definition, its indications and usefulness. As an initial step in a research program on this phenomenon, it was necessary to identify chiropractors' rationale for their use...

  15. Maintenance as a corporate strategy.

    Science.gov (United States)

    Clarke, D

    2000-11-01

    As we move towards the 21st century, those Manufacturing Industries that survive, will have changed their "efficiency" focus away from the conventional wisdom of "efficient individual tasks", to focus on the "effectiveness of a total manufacturing process". This seemingly insignificant change of emphasis, (from task to process) must include "the integration of process plant maintenance into the production process". Manufacturing companies, which do not include an effective plant maintenance strategy into their business strategy, will not survive the business environment of the 21st Century.

  16. 14 CFR 145.205 - Maintenance, preventive maintenance, and alterations performed for certificate holders under...

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance, preventive maintenance, and...) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.205 Maintenance, preventive.... (a) A certificated repair station that performs maintenance, preventive maintenance, or alterations...

  17. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Operation after maintenance, preventive... OPERATING AND FLIGHT RULES Maintenance, Preventive Maintenance, and Alterations § 91.407 Operation after maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that...

  18. 14 CFR 125.245 - Organization required to perform maintenance, preventive maintenance, and alteration.

    Science.gov (United States)

    2010-01-01

    ... maintenance, preventive maintenance, and alteration. 125.245 Section 125.245 Aeronautics and Space FEDERAL..., preventive maintenance, and alteration. The certificate holder must ensure that each person with whom it arranges for the performance of maintenance, preventive maintenance, alteration, or required inspection...

  19. 14 CFR 145.213 - Inspection of maintenance, preventive maintenance, or alterations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Inspection of maintenance, preventive... Rules § 145.213 Inspection of maintenance, preventive maintenance, or alterations. (a) A certificated repair station must inspect each article upon which it has performed maintenance, preventive maintenance...

  20. 14 CFR 43.3 - Persons authorized to perform maintenance, preventive maintenance, rebuilding, and alterations.

    Science.gov (United States)

    2010-01-01

    ..., preventive maintenance, rebuilding, and alterations. 43.3 Section 43.3 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT MAINTENANCE, PREVENTIVE MAINTENANCE, REBUILDING, AND ALTERATION § 43.3 Persons authorized to perform maintenance, preventive maintenance, rebuilding, and...

  1. 14 CFR 91.1425 - CAMP: Maintenance, preventive maintenance, and alteration programs.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false CAMP: Maintenance, preventive maintenance... RULES Fractional Ownership Operations Program Management § 91.1425 CAMP: Maintenance, preventive... have an inspection program and a program covering other maintenance, preventive maintenance, or...

  2. Guidance for the design and management of a maintenance plan to assure safety and improve the predictability of a DOE nuclear irradiation facility. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Booth, R.S.; Kryter, R.C.; Shepard, R.L.; Smith, O.L. [Oak Ridge National Lab., TN (United States); Upadhyaya, B.R. [Univ. of Tennessee, Knoxville, TN (United States). Dept. of Nuclear Engineering; Rowan, W.J.

    1994-10-01

    A program is recommended for planning the maintenance of DOE nuclear facilities that will help safety and enhance availability throughout a facility`s life cycle. While investigating the requirements for maintenance activities, a major difference was identified between the strategy suitable for a conventional power reactor and one for a research reactor facility: the latter should provide a high degree of predicted availability (referred to hereafter as ``predictability``) to its users, whereas the former should maximize total energy production. These differing operating goals necessitate different maintenance strategies. A strategy for scheduling research reactor facility operation and shutdown for maintenance must balance safety, reliability,and predicted availability. The approach developed here is based on three major elements: (1) a probabilistic risk analysis of the balance between assured reliability and predictability (presented in Appendix C), (2) an assessment of the safety and operational impact of maintenance activities applied to various components of the facility, and (3) a data base of historical and operational information on the performance and requirements for maintenance of various components. These factors are integrated into a set of guidelines for designing a new highly maintainable facility, for preparing flexible schedules for improved maintenance of existing facilities, and for anticipating the maintenance required to extend the life of an aging facility. Although tailored to research reactor facilities, the methodology has broader applicability and may therefore be used to improved the maintenance of power reactors, particularly in anticipation of peak load demands.

  3. Maintenance as a safety issue.

    Science.gov (United States)

    White, Jim

    2008-11-01

    Because safety is related to electrical power systems maintenance, it seems reasonable to assume there could be legal issues if maintenance is not performed. OSHA has not yet taken the stand that not performing maintenance as required by the manufacturer, NFPA 70B, or ANSI/NETA MTS-07 constitutes a willful violation. OSHA defines a willful citation as one where: "the employer knowingly commits with plain indifference to the law. The employer either knows that what he or she is doing constitutes a violation, or is aware that a hazardous condition existed and made no reasonable effort to eliminate it". However, NFPA 70E 2009 requires this maintenance, and OSHA has stated on its Web site that NFPA 70E is "a guide for meeting the requirements of the OSHA electrical regulations". In addition, federal courts have found that NFPA 70E is "standard industry practice." Once a company receives and accepts a willful citation, especially if received as the result of an accident investigation, its worker's compensation protection no longer shields it. One definition given by a trial attorney for a willful citation was that it is equal to negligent behavior. Be smart: Maintain that equipment and save yourself major problems, including unscheduled shutdowns and possible litigation.

  4. Computer-Assisted School Maintenance

    Science.gov (United States)

    Kennedy, Mike

    2012-01-01

    At thousands of schools and universities, years of economic troubles have led to repeated budget cuts. The reductions typically fall disproportionately on maintenance departments, where cuts are viewed as less critical than those that directly affect classroom instruction. And so nearly every facility manager at an education institution faces a…

  5. Current concepts of periodontal maintenance.

    Science.gov (United States)

    Bower, R C

    1989-12-01

    Changing concepts and a more complete understanding of the aetiology of chronic marginal periodontitis allow a more rational approach to the treatment of patients with periodontal diseases. A sequence of treatment steps of increasing complexity is presented for the prevention of recurrence of chronic marginal periodontitis during the maintenance phase of treatment.

  6. Maintenance Sessions Prolong Cigarette Abstinence.

    Science.gov (United States)

    Brandon, Thomas H.; And Others

    Recent smoking treatment programs have shifted emphasis from initial cessation rates to long-term abstinence, with aversion therapy and coping response training having had the most success. A smoking cessation treatment consisting of rapid smoking and behavioral counseling was supplemented with two maintenance treatments. After completing the…

  7. Maintenance Sourcebook: Landscaping and Grounds.

    Science.gov (United States)

    Macht, Carol; Gomulka, Ken; Harper, Wayne; Conry, Terry

    2003-01-01

    Asserts that facility managers need continual education in many subjects to keep their campuses in excellent condition, highlighting four areas related to landscaping and maintenance: landscaping care; athletic field care; grounds care; and equipment care. Lists of relevant professional organizations are included. (SM)

  8. Maintenance of CERN telephone exchanges

    CERN Multimedia

    2005-01-01

    A maintenance of CERN telephone exchanges will be performed on 21st, 22nd, 23rd, 24th of September from 7 p.m. to 9 p.m. Disturbances or even interruptions of telephony services may occur during this lapse of time. We apology in advance for any inconveniences that this may cause.

  9. Afrikaans Language Maintenance in Australia

    Science.gov (United States)

    Hatoss, Aniko; Starks, Donna; van Rensburg, Henriette Janse

    2011-01-01

    Changes in the political climate in the home country have resulted in the emigration of South Africans to English speaking countries such as Britain, Canada, Australia and New Zealand. Despite the scale of movement of the South African population, language maintenance in these diasporic contexts has received little consideration. This paper…

  10. The Benefits of Health Maintenance.

    Science.gov (United States)

    Rosenstein, Alan H.

    1987-01-01

    The article focuses on the merits of a comprehensive, medically-oriented health maintenance/risk assessment program, and suggests that such conditions as heart disease, cancer, and arteriosclerosis can be prevented or postponed through proper nutrition, weight control, exercise, smoking cessation, and stress management. (Author/CB)

  11. Circassian Language Maintenance in Jordan

    Science.gov (United States)

    Rannut, Ulle

    2009-01-01

    The central goal of this research is to explore the language policy aspects in Jordan by focusing on the Circassian language maintenance issues and to provide measures for language revitalisation in the current demographic, linguistic and political situation. Research is based on multiple sources of information, but primarily on the empirical data…

  12. 40 CFR Appendix Xiv to Part 86 - Determination of Acceptable Durability Test Schedule for Light-Duty Vehicles and Light Light-Duty...

    Science.gov (United States)

    2010-07-01

    ... mileages at the proposed test points: Aprop = [∑(Xp)2 − ((∑Xp)2 / Np))prop Where: Xp = Individual mileages at which the vehicle will be tested. Np = Total number of tests (including before and after maintenance tests). (Subscript “p” refers to proposed test schedule). 3. Determine exhaust system mileage test...

  13. Hybrid stop schedule of urban rail train

    Directory of Open Access Journals (Sweden)

    Zhengmin Tan

    2015-01-01

    Full Text Available Purpose: In order to better serve the transport demand of urban area by rail, target at the Ur-ban Rail Train Stop Schedule problem.Design/methodology/approach: Bi-level mathematical programming model and game relation was used.Findings: A 0-1 bi-level mathematical programming model for urban rail transit hybrid Stop Schedule is developed when game relation between train Stop Schedule and passenger transfer choice is considered.Research limitations/implications: The research is still in progress. Practical implications: ChongQing urban rail line 2 was taken as an example, the practical application of the model has proved its feasibility and efficiency.Originality/value: A 0-1 bi-level mathematical programming model for urban rail transit hybrid Stop Schedule is developed. The upper level model is Stop Schedule targeting at the optimal profit from the operators side. The lower level model is passenger routing aims to minimize total travel time. According to its features, the bi-level model is integrated in order to be directly solvable by optimizing software.

  14. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  15. Analysis of crimes committed against scheduled tribes

    Science.gov (United States)

    Khadse, Vivek P.; Akhil, P.; Anto, Christopher; Gnanasigamani, Lydia J.

    2017-11-01

    One of the curses to the society is a crime which has a deep impact on the society. Victims of crimes are the one who is impacted the most. All communities in the world are affected by crime and the criminal justice system, but largely impacted communities are the backward classes. There are many cases reported of crime committed against scheduled tribes from the year 2005 till date. This paper states the analysis of Crimes Committed against Scheduled Tribes in the year 2015 in various states and union territories in India. In this study, Multiple Linear regression techniques have been used to analyze the crimes committed against scheduled tribes’ community in India. This study compares the number of cases reported to the police station and rate of crime committed in different states in India. It also states the future prediction of the crime that would happen. It will also predict the number of cases of crime committed against the scheduled tribe that can be reported in future. The dataset which has been used in this study is taken from official Indian government repository for crimes which include different information of crimes committed against scheduled tribes in different states and union territories measured under the population census of the year 2011. This study will help different Indian states and union territory government to analyze and predict the future crimes that may occur and take appropriate measures against it before the actual crime would occur.

  16. Human choice under schedules of negative reinforcement.

    Science.gov (United States)

    Alessandri, Jérôme; Cançado, Carlos R X

    2015-12-01

    The generalized matching equation provides a good description of response allocation in concurrent schedules of positive reinforcement in nonhumans as well as in humans. The present experiment was conducted to further investigate the allocation of responding under concurrent schedules of negative reinforcement (i.e., timeouts from pressing a force cell) in humans. Each of three participants was exposed to different reinforcement ratios (9:1, 1:1 and 1:9) in the terminal links of a concurrent-chains schedule of negative reinforcement. The allocation of responding under this schedule was well described by the generalized matching equation, for each participant. These results replicate previous findings obtained with nonhumans and humans under concurrent schedules of positive reinforcement. In addition, they extend the results reported by Alessandri and Rivière (2013) showing that human behavior maintained by timeouts from an effortful response is sensitive to changes in relative reinforcement ratios as well as relative delays of reinforcement. Copyright © 2015 Elsevier B.V. All rights reserved.

  17. Generalized multiprocessor scheduling for directed acylic graphs

    Energy Technology Data Exchange (ETDEWEB)

    Prasanna, G.N.S. [AT and T Bell Labs., Murray Hill, NJ (United States); Musicus, B.R. [Bolt, Beranek, and Newman, Inc., Cambridge, MA (United States)

    1994-12-31

    This paper considerably extends the multiprocessor scheduling techniques in the authors` previous work, and applies it to matrix arithmetic compilation. In that paper, they presented several new results in the theory of homogeneous multiprocessor scheduling. A directed acyclic graph (DAG) of tasks is to be scheduled. Tasks are assumed to be parallelizable -- as more processors are applied to a task, the time taken to compute it decreases, yielding some speedup. Because of communication, synchronization, and task scheduling overhead, this speedup increases less than linearly with the number of processors applied. The optimal scheduling problem is to determine the number of processors assigned to each task, and task sequencing, to minimize the finishing time. Using optimal control theory, in the special case where the speedup function of each task is p{sup {alpha}}, where p is the amount of processing power applied to the task, a closed form solution for task graphs formed from parallel and series connections was derived. This paper extends these results for arbitrary DAGS. The optimality conditions impose nonlinear constraints on the flow of processing power from predecessors to successors, and on the finishing times of siblings. This paper presents a fast algorithm for determining and solving these nonlinear equations. The algorithm utilizes the structure of the finishing time equations to efficiently run a conjugate gradient minimization, leading to the optimal solution. The algorithm has been tested on a variety of DAGS. The results presented show that it is superior to alternative heuristic approaches.

  18. An Improved Multiobjective PSO for the Scheduling Problem of Panel Block Construction

    Directory of Open Access Journals (Sweden)

    Zhi Yang

    2016-01-01

    Full Text Available Uncertainty is common in ship construction. However, few studies have focused on scheduling problems under uncertainty in shipbuilding. This paper formulates the scheduling problem of panel block construction as a multiobjective fuzzy flow shop scheduling problem (FSSP with a fuzzy processing time, a fuzzy due date, and the just-in-time (JIT concept. An improved multiobjective particle swarm optimization called MOPSO-M is developed to solve the scheduling problem. MOPSO-M utilizes a ranked-order-value rule to convert the continuous position of particles into the discrete permutations of jobs, and an available mapping is employed to obtain the precedence-based permutation of the jobs. In addition, to improve the performance of MOPSO-M, archive maintenance is combined with global best position selection, and mutation and a velocity constriction mechanism are introduced into the algorithm. The feasibility and effectiveness of MOPSO-M are assessed in comparison with general MOPSO and nondominated sorting genetic algorithm-II (NSGA-II.

  19. Preadaptation to the feeding schedule does not eliminate activity-based anorexia in rats.

    Science.gov (United States)

    Lett, B T; Grant, V L; Smith, J F; Koh, M T

    2001-08-01

    To test whether activity-based anorexia (ABA) still occurs after preadaptation to the feeding schedule, 20 rats were first exposed to a feeding schedule of one 90-min meal per day until adaptation occurred (measured by maintenance of stable body weight). Then, during ABA training, half the rats (wheel group) were confined in running wheels except during the daily meal, and half (cage group) were not. Wheel running suppressed feeding--that is, food intake in the wheel group was less than that in the cage group. Also, the rats in the wheel group lost weight, whereas those in the cage group did not. Wheel running increased over days. Thus, the defining characteristics of ABA were evident in rats that were not subjected to ABA training until after they had become well adapted to the feeding schedule. These findings support the view that the suppression of feeding produced by wheel running triggers the vicious circle of ABA. They also cast doubt on the hypothesis that activity-induced interference with adaptation to the feeding schedule plays a key role in causing ABA.

  20. GRAPHICAL MODELS OF THE AIRCRAFT MAINTENANCE PROCESS

    Directory of Open Access Journals (Sweden)

    Stanislav Vladimirovich Daletskiy

    2017-01-01

    Full Text Available The aircraft maintenance is realized by a rapid sequence of maintenance organizational and technical states, its re- search and analysis are carried out by statistical methods. The maintenance process concludes aircraft technical states con- nected with the objective patterns of technical qualities changes of the aircraft as a maintenance object and organizational states which determine the subjective organization and planning process of aircraft using. The objective maintenance pro- cess is realized in Maintenance and Repair System which does not include maintenance organization and planning and is a set of related elements: aircraft, Maintenance and Repair measures, executors and documentation that sets rules of their interaction for maintaining of the aircraft reliability and readiness for flight. The aircraft organizational and technical states are considered, their characteristics and heuristic estimates of connection in knots and arcs of graphs and of aircraft organi- zational states during regular maintenance and at technical state failure are given. It is shown that in real conditions of air- craft maintenance, planned aircraft technical state control and maintenance control through it, is only defined by Mainte- nance and Repair conditions at a given Maintenance and Repair type and form structures, and correspondingly by setting principles of Maintenance and Repair work types to the execution, due to maintenance, by aircraft and all its units mainte- nance and reconstruction strategies. The realization of planned Maintenance and Repair process determines the one of the constant maintenance component. The proposed graphical models allow to reveal quantitative correlations between graph knots to improve maintenance processes by statistical research methods, what reduces manning, timetable and expenses for providing safe civil aviation aircraft maintenance.

  1. Incubation lighting schedules and their interaction with matched or mismatched post hatch lighting schedules

    NARCIS (Netherlands)

    Pol, van der Carla W.; Roovert-Reijrink, van Inge A.M.; Aalbers, Gerald; Kemp, Bas; Brand, van den Henry

    2017-01-01

    The incidence of leg pathologies in broiler chickens with a developmental origin may be decreased by stimulating embryonic bone development through lighting schedules during incubation, but this may depend on post hatch lighting conditions. Aim was to investigate how lighting schedules during

  2. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  3. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    Science.gov (United States)

    Muscettola, Nicola; Smith, Steven S.

    1996-09-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  4. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  5. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  6. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    Science.gov (United States)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  7. 77 FR 63766 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2012-10-17

    ...- methylenedioxypyrovalerone (MDPV)) into Schedule I pursuant to the temporary scheduling provisions of the CSA (76 FR 55616... section 202(c) of the CSA to include mephedrone and MDPV but not methylone, and amended section 201(h)(2... Health for HHS for methylone, mephedrone and MDPV pursuant to 21 U.S.C. 811(b). Upon receipt and...

  8. 10 CFR 2.332 - General case scheduling and management.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false General case scheduling and management. 2.332 Section 2... Management for NRC Adjudicatory Hearings § 2.332 General case scheduling and management. (a) Scheduling order... scheduling order must have as its objectives proper case management purposes such as: (1) Expediting the...

  9. Dry kiln schedules for commercial woods : temperate and tropical

    Science.gov (United States)

    R. Sidney Boone; Charles J. Kozlik; Paul J. Bois; Eugene M. Wengert

    1988-01-01

    This report contains suggested dry kiln schedules for over 500 commercial woods, both temperate and tropical. Kiln schedules are completely assembled and written out for easy use. Schedules for several thicknesses and specialty products (e.g. squares, handle stock, gunstock blanks) are given for many species. The majority of the schedules are from the world literature...

  10. Automated Scheduling of Science Activities for Titan Encounters by Cassini

    Science.gov (United States)

    Ray, Trina L.; Knight, Russel L.; Mohr, Dave

    2014-01-01

    In an effort to demonstrate the efficacy of automated planning and scheduling techniques for large missions, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] and CLASP (Compressed Large-scale Activity Scheduling and Planning) [2] to the domain of scheduling high-level science goals into conflict-free operations plans for Titan encounters by the Cassini spacecraft.

  11. System/360 Computer Assisted Network Scheduling (CANS) System

    Science.gov (United States)

    Brewer, A. C.

    1972-01-01

    Computer assisted scheduling techniques that produce conflict-free and efficient schedules have been developed and implemented to meet needs of the Manned Space Flight Network. CANS system provides effective management of resources in complex scheduling environment. System is automated resource scheduling, controlling, planning, information storage and retrieval tool.

  12. 40 CFR 147.2921 - Schedule of compliance.

    Science.gov (United States)

    2010-07-01

    ...-Class II Wells § 147.2921 Schedule of compliance. The permit may, when appropriate, specify a schedule... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Schedule of compliance. 147.2921.... (a) Any schedule of compliance shall require compliance as soon as possible, and in no case later...

  13. Topology-based hierarchical scheduling using deficit round robin

    DEFF Research Database (Denmark)

    Yu, Hao; Yan, Ying; Berger, Michael Stubert

    2009-01-01

    This paper proposes a topology-based hierarchical scheduling scheme using Deficit Round Robin (DRR). The main idea of the topology-based hierarchical scheduling is to map the topology of the connected network into the logical structure of the scheduler, and combine several token schedulers...

  14. Global Scheduling Heuristics for Multicore Architecture

    Directory of Open Access Journals (Sweden)

    D. C. Kiran

    2015-01-01

    Full Text Available This work discusses various compiler level global scheduling techniques for multicore processors. The main contribution of the work is to delegate the job of exploiting fine grained parallelism to the compiler, thereby reducing the hardware overhead and the programming complexity. This goal is achieved by decomposing a sequential program into multiple subblocks and constructing subblock dependency graph (SDG. The proposed schedulers select subblocks from the SDG and schedules it on different cores, by ensuring the correct order of execution of subblocks. In conjunction with parallelization techniques, locality optimizations are performed to minimize communication overhead between the cores. The results observed are indicative of better and balanced speed-up per watt.

  15. Energy-aware scheduling on multiprocessor platforms

    CERN Document Server

    Li, Dawei

    2014-01-01

    Multiprocessor platforms play important roles in modern computing systems, and appear in various applications, ranging from energy-limited hand-held devices to large data centers. As the performance requirements increase, energy-consumption in these systems also increases signi cantly. Dynamic Voltage and Frequency Scaling (DVFS), which allows processors to dynamically adjust the supply voltage and the clock frequency to operate on di erent power/energy levels, is considered an e ective way to achieve the goal of energy-saving. This book surveys existing works that have been on energy-aware task scheduling on DVFS multiprocessor platforms. Energy-aware scheduling problems are intrinsically optimization problems, the formulations of which greatly depend on the platform and task models under consideration. Thus, Energy-aware Scheduling on Multiprocessor Platforms covers current research on this topic and classi es existing works according to two key standards, namely, homogeneity/heterogeneity of multi processo...

  16. An introduction to optimal satellite range scheduling

    CERN Document Server

    Vázquez Álvarez, Antonio José

    2015-01-01

    The satellite range scheduling (SRS) problem, an important operations research problem in the aerospace industry consisting of allocating tasks among satellites and Earth-bound objects, is examined in this book. SRS principles and solutions are applicable to many areas, including: Satellite communications, where tasks are communication intervals between sets of satellites and ground stations Earth observation, where tasks are observations of spots on the Earth by satellites Sensor scheduling, where tasks are observations of satellites by sensors on the Earth. This self-contained monograph begins with a structured compendium of the problem and moves on to explain the optimal approach to the solution, which includes aspects from graph theory, set theory, game theory and belief networks. This book is accessible to students, professionals and researchers in a variety of fields, including: operations research, optimization, scheduling theory, dynamic programming and game theory. Taking account of the distributed, ...

  17. Scheduling jobs that arrive over time

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, C. [Sandia National Labs., Albuquerque, NM (United States); Stein, C. [Dartmouth Coll., Hanover, NH (United States); Wein, J. [Polytechnic Univ., Brooklyn, NY (United States). Dept. of Computer Science

    1995-04-06

    A natural and basic problem in scheduling theory is to provide good average quality of service to a stream of jobs that arrive over time. In this paper we consider the problem of scheduling n jobs that are released over time in order to minimize the average completion time of the set of jobs. In contrast to the problem of minimizing average completion time when all jobs are available at time 0, all the problems that we consider are NP-hard, and essentially nothing was known about constructing good approximations in polynomial time. We give the first constant-factor approximation algorithms for several variants of the single and parallel machine model. Many of the algorithms are based on interesting algorithmic and structural relationships between preemptive and nonpreemptive schedules and linear programming relaxations of both. Many of the algorithms generalize to the minimization of average weighted completion time as well.

  18. Optimal Scheduling of Domestic Appliances via MILP

    Directory of Open Access Journals (Sweden)

    Zdenek Bradac

    2014-12-01

    Full Text Available This paper analyzes a consumption scheduling mechanism for domestic appliances within a home area network. The aim of the proposed scheduling is to minimize the total energy price paid by the consumer and to reduce power peaks in order to achieve a balanced daily load schedule. An exact and computationally efficient mixed-integer linear programming (MILP formulation of the problem is presented. This model is verified by several problem instances. Realistic scenarios based on the real price tariffs commercially available in the Czech Republic are calculated. The results obtained by solving the optimization problem are compared with a simulation of the ripple control service currently used by many domestic consumers in the Czech Republic.

  19. A progressive-duration schedule of reinforcement.

    Science.gov (United States)

    Gulotta, Kara B; Byrne, Tom

    2015-12-01

    We describe a schedule of reinforcement involving systematic, within-session increases in response-duration requirements. Rats received access to appetitive reinforcers for depressing and holding down a response lever. Duration requirements increased after each reinforcer delivery. Sessions ended when reinforcement criteria were unmet for a period of ten minutes. Breaking points, defined as the terminal duration requirement in effect prior to the end of the session, stabilized when environmental conditions were held constant. Breaking points were sensitive to manipulations of both food deprivation and reinforcer quality. Analogous to progressive-ratio schedules, progressive-duration schedules may provide an assay for measuring the amount of behavior an organism will emit for a given reinforcer under current motivational conditions. Copyright © 2015 Elsevier B.V. All rights reserved.

  20. Scheduling support for transactional memory contention management

    DEFF Research Database (Denmark)

    Maldonado, Walther; Marler, Patrick; Felber, Pascal

    2010-01-01

    Transactional Memory (TM) is considered as one of the most promising paradigms for developing concurrent applications. TM has been shown to scale well on >multiple cores when the data access pattern behaves "well," i.e., when few conflicts are induced. In contrast, data patterns with frequent write......-management has been proposed for increasing TM efficiency under high-contention [2, 5, 19]. However, only user-level schedulers have been considered. In this work, we propose, implement and evaluate several novel kernel-level scheduling support mechanisms for TM contention management. We also investigate...... different strategies for efficient communication between the kernel and the user-level TM library. To the best of our knowledge, our work is the first to investigate kernel-level support for TM contention management. We have introduced kernel-level TM scheduling support into both the Linux and Solaris...

  1. Cost and schedule estimation study report

    Science.gov (United States)

    Condon, Steve; Regardie, Myrna; Stark, Mike; Waligora, Sharon

    1993-01-01

    This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.

  2. A heuristic approach to incremental and reactive scheduling

    Science.gov (United States)

    Odubiyi, Jide B.; Zoch, David R.

    1989-01-01

    An heuristic approach to incremental and reactive scheduling is described. Incremental scheduling is the process of modifying an existing schedule if the initial schedule does not meet its stated initial goals. Reactive scheduling occurs in near real-time in response to changes in available resources or the occurrence of targets of opportunity. Only minor changes are made during both incremental and reactive scheduling because a goal of re-scheduling procedures is to minimally impact the schedule. The described heuristic search techniques, which are employed by the Request Oriented Scheduling Engine (ROSE), a prototype generic scheduler, efficiently approximate the cost of reaching a goal from a given state and effective mechanisms for controlling search.

  3. Scheduling Operations for Massive Heterogeneous Clusters

    Science.gov (United States)

    Humphrey, John; Spagnoli, Kyle

    2013-01-01

    High-performance computing (HPC) programming has become increasingly difficult with the advent of hybrid supercomputers consisting of multicore CPUs and accelerator boards such as the GPU. Manual tuning of software to achieve high performance on this type of machine has been performed by programmers. This is needlessly difficult and prone to being invalidated by new hardware, new software, or changes in the underlying code. A system was developed for task-based representation of programs, which when coupled with a scheduler and runtime system, allows for many benefits, including higher performance and utilization of computational resources, easier programming and porting, and adaptations of code during runtime. The system consists of a method of representing computer algorithms as a series of data-dependent tasks. The series forms a graph, which can be scheduled for execution on many nodes of a supercomputer efficiently by a computer algorithm. The schedule is executed by a dispatch component, which is tailored to understand all of the hardware types that may be available within the system. The scheduler is informed by a cluster mapping tool, which generates a topology of available resources and their strengths and communication costs. Software is decoupled from its hardware, which aids in porting to future architectures. A computer algorithm schedules all operations, which for systems of high complexity (i.e., most NASA codes), cannot be performed optimally by a human. The system aids in reducing repetitive code, such as communication code, and aids in the reduction of redundant code across projects. It adds new features to code automatically, such as recovering from a lost node or the ability to modify the code while running. In this project, the innovators at the time of this reporting intend to develop two distinct technologies that build upon each other and both of which serve as building blocks for more efficient HPC usage. First is the scheduling and dynamic

  4. Service scheduling for WWW traffic in GPRS

    Science.gov (United States)

    Shen, Qingguo

    2004-04-01

    Transmission scheduling algorithm for WWW traffic in GPRS needs to be optimized according to characteristics of Temporary Block Flow, TCP/IP and mobile access behavior. We analyze the radio resource allocation problem in GPRS and design a new scheduling algorithm FIFO-with-flow. It is simple and can adapt to temporal flows, and allocate bandwidth among temporal flows fairly. Based on the characteristics of mobile user access behavior, we determine the wireless WWW traffic model and its parameters reflecting TCP congest control. We simulate and compare the performance of FIFO-with-flow and FIFO. The FIFO-with-flow can support more WWW users than FIFO.

  5. Real-time systems scheduling 2 focuses

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc. Scheduling is a central problem for these computing/communication systems since it is responsible for software execution in a timely manner. This book, the second of two volumes on the subject, brings together knowledge on specific topics and discusses the recent advances for some of them.  It addresses foundations as well as the latest advances and findings in real-time scheduling, giving comprehensive references to important papers, but the chapters are short and not overloaded with co

  6. Real-time systems scheduling fundamentals

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc.  Scheduling is a central problem for these computing/communication systems since responsible of software execution in a timely manner. This book provides state of knowledge in this domain with special emphasis on the key results obtained within the last decade. This book addresses foundations as well as the latest advances and findings in Real-Time Scheduling, giving all references to important papers. But nevertheless the chapters will be short and not overloaded with confusing details.

  7. Planning, scheduling, and control for automatic telescopes

    Science.gov (United States)

    Drummond, Mark; Swanson, Keith; Philips, Andy; Levinson, Rich; Bresina, John

    1992-01-01

    This paper presents an argument for the appropriateness of Entropy Reduction Engine (ERE) technology to the planning, scheduling, and control components of Automatic Photoelectric Telescope (APT) management. The paper is organized as follows. In the next section, we give a brief summary of the planning and scheduling requirements for APTs. Following this, in section 3, we give an ERE project precis, couched primarily in terms of project objectives. Section 4 gives a sketch of the match-up between problem and technology, and section 5 outlines where we want to go with this work.

  8. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  9. Load scheduling for decentralized CHP plants

    DEFF Research Database (Denmark)

    Nielsen, Henrik Aalborg, orlov 31.07.2008; Madsen, Henrik; Nielsen, Torben Skov

    .91) the calculations can be performed quickly enough to allow use to be applicable in practice. One optimal schedule covering one week can easily be found within 5 to 10 seconds. When considering many possible realizations of the future heat demand some techniques are needed to reduce the amount of CPU time required....... The results indicate that it is possible to find optimal schedules for 100 realizations of heat demand using less than 3 minutes of CPU time. Furthermore, the methods allow for massive use of parallel processing....

  10. Optimizing the Shunting Schedule of Electric Multiple Units Depot Using an Enhanced Particle Swarm Optimization Algorithm

    Science.gov (United States)

    Jin, Junchen

    2016-01-01

    The shunting schedule of electric multiple units depot (SSED) is one of the essential plans for high-speed train maintenance activities. This paper presents a 0-1 programming model to address the problem of determining an optimal SSED through automatic computing. The objective of the model is to minimize the number of shunting movements and the constraints include track occupation conflicts, shunting routes conflicts, time durations of maintenance processes, and shunting running time. An enhanced particle swarm optimization (EPSO) algorithm is proposed to solve the optimization problem. Finally, an empirical study from Shanghai South EMU Depot is carried out to illustrate the model and EPSO algorithm. The optimization results indicate that the proposed method is valid for the SSED problem and that the EPSO algorithm outperforms the traditional PSO algorithm on the aspect of optimality. PMID:27436998

  11. Optimizing the Shunting Schedule of Electric Multiple Units Depot Using an Enhanced Particle Swarm Optimization Algorithm

    Directory of Open Access Journals (Sweden)

    Jiaxi Wang

    2016-01-01

    Full Text Available The shunting schedule of electric multiple units depot (SSED is one of the essential plans for high-speed train maintenance activities. This paper presents a 0-1 programming model to address the problem of determining an optimal SSED through automatic computing. The objective of the model is to minimize the number of shunting movements and the constraints include track occupation conflicts, shunting routes conflicts, time durations of maintenance processes, and shunting running time. An enhanced particle swarm optimization (EPSO algorithm is proposed to solve the optimization problem. Finally, an empirical study from Shanghai South EMU Depot is carried out to illustrate the model and EPSO algorithm. The optimization results indicate that the proposed method is valid for the SSED problem and that the EPSO algorithm outperforms the traditional PSO algorithm on the aspect of optimality.

  12. Group Elevator Peak Scheduling Based on Robust Optimization Model

    OpenAIRE

    Zhang, J.; Q. Zong

    2013-01-01

    Scheduling of Elevator Group Control System (EGCS) is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization) method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is re...

  13. Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle

    Science.gov (United States)

    Patterson-Hine, Ann; Deb, Somnath; Kulkarni, Deepak; Wang, Yao; Lau, Sonie (Technical Monitor)

    1998-01-01

    The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.

  14. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  15. Maintenance guide for air-operated valves, pneumatic actuators, and accessories

    Energy Technology Data Exchange (ETDEWEB)

    Preckwinkle, S.E. (Fossil Technologies, Inc., Kelso, WA (United States))

    1992-07-01

    Air Operated Valves (AOVs) are used extensively in the power generation industry for process control and system isolation functions. Their proper operation is essential to reliable power plant operation. This guide discusses major components such as actuators, valves, and positioners, and explains the inter-relationship of these components. Diagrams indicating the application and operation of various types of actuators are presented as an aid for thorough investigation of malfunctioning equipment. Recent developments on diagnostic equipment for AOVs are covered and valve traces on valves with maintenance related problems are used to demonstrate how the diagnostic equipment can quickly solve complex valve problems. In addition, predictive and preventive maintenance recommendations based on specific failure data are included. The guide also includes a troubleshooting section with tables providing easily accessible information to minimize troubleshooting costs. Appendices augment the guide by providing a glossary of terms and various engineering schedules including useful engineering parameters for the proper maintenance of air operated valves and accessories.

  16. Railroad decision support tools for track maintenance.

    Science.gov (United States)

    2016-01-01

    North American railroads spend billions of dollars each year on track maintenance. With : expenditures of this level, incremental improvements in planning or execution of maintenance projects can result in either substantial savings or the ability to...

  17. Maintenance practices for stormwater runoff - phase 2.

    Science.gov (United States)

    2015-04-01

    Seven wet detention ponds possessing severe maintenance issues were selected from disparate FDOT : districts. The maintenance problems ranged from excess littoral zone growth and intense algal blooms : to bank erosion and sediment accumulation. Inten...

  18. Machine maintenance: the rules of the game

    CERN Multimedia

    Antonella Del Rosso

    2013-01-01

    GCO, GMIO, GSPO – ever heard of them? These acronyms stand for the “roles” that best practices identify as vital to successful maintenance management. CERN’s Maintenance Management Project (MMP) team is working with the technical departments to ensure that they implement these procedures when they deal with the maintenance of the collider and its injectors and infrastructure.   The participants of the workshop on asset and maintenance management (AMMW2013), which took place at CERN in November. Since its creation in 2012, CERN’s Maintenance Framework Implementation Office (MFIO) has been promoting the deployment of harmonised maintenance management methods across the BE, GS, EN and TE Departments. “The definition and identification of the Group Coding Officers (GCO), Group Maintenance Information Officers (GMIO) and Group Spare Part Officers (GSPO) are one of the best practices that should be adopted each time a maintenance programme...

  19. Consolidating Air Force Maintenance Occupational Specialties

    Science.gov (United States)

    2016-01-01

    MDS mission design series MOB main operating base MQTP Maintenance Qualification Training Program MSgt Master Sergeant Mx maintenance MXS...dictates]). Within the contiguous United States main operating base ( MOB ) structure, each MOB has all required support functions to maintain

  20. Fleet equipment performance measure preventive maintenance model.

    Science.gov (United States)

    2013-02-28

    The Texas Department of Transportation : (TxDOT) operates a large fleet of on-road and : off-road equipment. Consequently, fleet : maintenance procedures (specifically preventive : maintenance such as oil changes) represent a : significant cost to th...