WorldWideScience

Sample records for schedule maintenance information

  1. Health Information Sources, Perceived Vaccination Benefits, and Maintenance of Childhood Vaccination Schedules.

    Science.gov (United States)

    Hwang, Juwon; Shah, Dhavan V

    2018-06-05

    Parental concerns over the safety or necessity of childhood vaccination have increased over the past decades. At the same time, there has been a proliferation of vaccine-related information available through a range of health information sources. This study investigates the associations between evaluations of health information sources, parental perceptions of childhood vaccination benefits, and the maintenance of vaccination schedules for their children. Specifically, this study aims to (a) incorporate social media into the battery of health information sources and (b) differentiate households with a childhood autism diagnosis and those without, given unsubstantiated but persistent concerns about vaccine safety and autism. Analyzing a sample of U.S. households, a total of 4,174 parents who have at least one child under the age of 18 were analyzed, including 138 of parents of households with a childhood autism diagnosis. Results show that the more the parents value interpersonal communication and magazines as sources of health information, the more they perceive vaccination benefits, and the more the value they put on television, the better they keep vaccination schedules up-to-date for their children. On the other hand, social media are negatively associated with their perceptions of vaccination benefits. Although parents of children diagnosed with autism are less likely to perceive vaccination benefits, no interaction effects with evaluations of health information sources are found on parental perceptions of vaccination benefits or maintenance of schedules.

  2. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  3. Generating unit maintenance scheduling under competitive market environments

    International Nuclear Information System (INIS)

    Jin Ho Kim; Jong Bae Park; Jong Keun Park; Yeung Han Chun

    2005-01-01

    A novel approach to a generating unit maintenance scheduling problem in competitive electricity markets is presented in this paper. The objective is to develop a game-theoretic framework for analyzing strategic behaviors of generating companies (Gencos) from the standpoint of the generating unit maintenance scheduling (GMS) game and for obtaining the equilibrium solution for the GMS game. The GMS problem is formulated as a dynamic non-cooperative game with complete information. The players correspond to profit maximizing individual Gencos, and the payoff of each player is defined as the profits from the energy market. The optimal schedule is defined by Nash equilibrium (equilibriums) of the game. Numerical results for two-Genco system are used to demonstrate that the proposed framework can be successfully applied to analyzing the strategic behaviors of each Genco and to obtaining the corresponding Nash equilibrium. The result indicates that generating unit maintenance schedule is one of the major strategic behaviors whereby Genco maximize their profits in a competitive market environment. (author)

  4. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  5. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  6. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  7. Nuclear power plant maintenance scheduling dilemma: a genetic algorithm approach

    International Nuclear Information System (INIS)

    Mahdavi, M.H.; Modarres, M.

    2004-01-01

    There are huge numbers of components scheduled for maintenance when a nuclear power plant is shut down. Among these components, a number of them are safety related which their operability as well as reliability when plant becomes up is main concerns. Not performing proper maintenance on this class of components/system would impose substantial risk on operating the NPP. In this paper a new approach based on genetic algorithms is presented to optimize the NPP maintenance schedule during shutdown. following this approach the cost incurred by maintenance activities for each schedule is balanced with the risk imposed by the maintenance scheduling plan to the plant operation status when it is up. The risk model implemented in the GA scheduler as its evaluation function is developed on the basis of the probabilistic risk assessment methodology. the Ga optimizers itself is shown to be superior compared to other optimization methods such as the monte carlo technique

  8. Joint optimization of production scheduling and machine group preventive maintenance

    International Nuclear Information System (INIS)

    Xiao, Lei; Song, Sanling; Chen, Xiaohui; Coit, David W.

    2016-01-01

    Joint optimization models were developed combining group preventive maintenance of a series system and production scheduling. In this paper, we propose a joint optimization model to minimize the total cost including production cost, preventive maintenance cost, minimal repair cost for unexpected failures and tardiness cost. The total cost depends on both the production process and the machine maintenance plan associated with reliability. For the problems addressed in this research, any machine unavailability leads to system downtime. Therefore, it is important to optimize the preventive maintenance of machines because their performance impacts the collective production processing associated with all machines. Too lengthy preventive maintenance intervals may be associated with low scheduled machine maintenance cost, but may incur expensive costs for unplanned failure due to low machine reliability. Alternatively, too frequent preventive maintenance activities may achieve the desired high reliability machines, but unacceptably high scheduled maintenance cost. Additionally, product scheduling plans affect tardiness and maintenance cost. Two results are obtained when solving the problem; the optimal group preventive maintenance interval for machines, and the assignment of each job, including the corresponding start time and completion time. To solve this non-deterministic polynomial-time problem, random keys genetic algorithms are used, and a numerical example is solved to illustrate the proposed model. - Highlights: • Group preventive maintenance (PM) planning and production scheduling are jointed. • Maintenance interval and assignment of jobs are decided by minimizing total cost. • Relationships among system age, PM, job processing time are quantified. • Random keys genetic algorithms (GA) are used to solve the NP-hard problem. • Random keys GA and Particle Swarm Optimization (PSO) are compared.

  9. Proposing New Heuristic Approaches for Preventive Maintenance Scheduling

    Directory of Open Access Journals (Sweden)

    majid Esmailian

    2013-08-01

    Full Text Available The purpose of preventive maintenance management is to perform a series of tasks that prevent or minimize production breakdowns and improve reliability of production facilities. An important objective of preventive maintenance management is to minimize downtime of production facilities. In order to accomplish this objective, personnel should efficiently allocate resources and determine an effective maintenance schedule. Gopalakrishnan (1997 developed a mathematical model and four heuristic approaches to solve the preventive maintenance scheduling problem of assigning skilled personnel to work with tasks that require a set of corresponding skills. However, there are several limitations in the prior work in this area of research. The craft combination problem has not been solved because the craft combination is assumed as given. The craft combination problem concerns the computation of all combinations of assigning multi skilled workers to accomplishment of a particular task. In fact, determining craft combinations is difficult because of the exponential number of craft combinations that are possible. This research provides a heuristic approach for determining the craft combination and four new heuristic approach solution for the preventive maintenance scheduling problem with multi skilled workforce constraints. In order to examine the new heuristic approach and to compare the new heuristic approach with heuristic approach of Gopalakrishnan (1997, 81 standard problems have been generated based on the criterion suggested by from Gopalakrishnan (1997. The average solution quality (SQ of the new heuristic approaches is 1.86% and in old heuristic approaches is 8.32%. The solution time of new heuristic approaches are shorter than old heuristic approaches. The solution time of new heuristic approaches is 0.78 second and old heuristic approaches is 6.43 second, but the solution time of mathematical model provided by Gopalakrishnan (1997 is 152 second.

  10. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  11. DEVELOPMENT OF A MAINTENANCE SCHEDULING MODEL FOR ...

    African Journals Online (AJOL)

    ... of minor maintenance, for each machine within this time span. In order to minimize the total cost of repairs and production. A numerical application of this development model in a case study is presented. Key words: Maintenance, modeling, scheduling, optimization. [Global Jnl Engineering Res. Vol.1(2) 2002: 107-118] ...

  12. Automatic scheduling of maintenance work in nuclear power plants

    International Nuclear Information System (INIS)

    Kasahara, T.; Nishizawa, Y.; Kato, K.; Kiguchi, T.

    1987-01-01

    An automatic scheduling method for maintenance work in nuclear power plants has been developed using an AI technique. The purpose of this method is to help plant operators by adjusting the time schedule of various kinds of maintenance work so that incorrect ordering or timing of plant manipulations does not cause undersirable results, such as a plant trip. The functions of the method were tested by off-line simulations. The results show that the method can produce a satisfactory schedule of plant component manipulations without interference between the tasks and plant conditions

  13. Preventive maintenance optimization for a multi-component system under changing job shop schedule

    International Nuclear Information System (INIS)

    Zhou Xiaojun; Lu Zhiqiang; Xi Lifeng

    2012-01-01

    Variability and small lot size is a common feature for many discrete manufacturing processes designed to meet a wide array of customer needs. Because of this, job shop schedule often has to be continuously updated in reaction to changes in production plan. Generally, the aim of preventive maintenance is to ensure production effectiveness and therefore the preventive maintenance models must have the ability to be adaptive to changes in job shop schedule. In this paper, a dynamic opportunistic preventive maintenance model is developed for a multi-component system with considering changes in job shop schedule. Whenever a job is completed, preventive maintenance opportunities arise for all the components in the system. An optimal maintenance practice is dynamically determined by maximizing the short-term cumulative opportunistic maintenance cost savings for the system. The numerical example shows that the scheme obtained by the proposed model can effectively address the preventive maintenance scheduling problem caused by the changes in job shop schedule and is more efficient than the ones based on two other commonly used preventive maintenance models.

  14. Condition-based maintenance at both scheduled and unscheduled opportunities

    NARCIS (Netherlands)

    Kalosi, S.; Kapodistria, S.; Resing, J.A.C.

    2016-01-01

    Motivated by original equipment manufacturer (OEM) service and maintenance practices we consider a single component subject to replacements at failure instances and two types of preventive maintenance opportunities: scheduled, which occur due to periodic system reviews of the equipment, and

  15. Preventive Maintenance Scheduling for Multicogeneration Plants with Production Constraints Using Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Khaled Alhamad

    2015-01-01

    Full Text Available This paper describes a method developed to schedule the preventive maintenance tasks of the generation and desalination units in separate and linked cogeneration plants provided that all the necessary maintenance and production constraints are satisfied. The proposed methodology is used to generate two preventing maintenance schedules, one for electricity and the other for distiller. Two types of crossover operators were adopted, 2-point and 4-point. The objective function of the model is to maximize the available number of operational units in each plant. The results obtained were satisfying the problem parameters. However, 4-point slightly produce better solution than 2-point ones for both electricity and water distiller. The performance as well as the effectiveness of the genetic algorithm in solving preventive maintenance scheduling is applied and tested on a real system of 21 units for electricity and 21 units for water. The results presented here show a great potential for utility applications for effective energy management over a time horizon of 52 weeks. The model presented is an effective decision tool that optimizes the solution of the maintenance scheduling problem for cogeneration plants under maintenance and production constraints.

  16. Scheduling the maintenance of gaseous diffusion and electric power distribution plants

    International Nuclear Information System (INIS)

    Chauvet, D.

    1990-01-01

    A computer aided scheduling applied to the maintenance of a uranium enrichment plant is presented. The plant exploits gaseous diffusion and electric power distribution plants, for which the operating conditions must be satisfied. The management and the execution of the maintenance actions are computer aided. Concerning the techniques, the cost, the safety and the scheduling actions were optimized [fr

  17. A heuristic model for risk and cost impacts of plant outage maintenance schedule

    International Nuclear Information System (INIS)

    Mohammad Hadi Hadavi, S.

    2009-01-01

    Cost and risk are two major competing criteria in maintenance optimization problems. If a plant is forced to shutdown because of accident or fear of accident happening, beside loss of revenue, it causes damage to the credibility and reputation of the business operation. In this paper a heuristic model for incorporating three compelling optimization criteria (i.e., risk, cost, and loss) into a single evaluation function is proposed. Such a model could be used in any evaluation engine of outage maintenance schedule optimizer. It is attempted to make the model realistic and to address the ongoing challenges facing a schedule planner in a simple and commonly understandable fashion. Two simple competing schedules for the NPP feedwater system are examined against the model. The results show that while the model successfully addresses the current challenges for outage maintenance optimization, it properly demonstrates the dynamics of schedule in regards to risk, cost, and losses endured by maintenance schedule, particularly when prolonged outage and lack of maintenance for equipments in need of urgent care are of concern.

  18. A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem

    DEFF Research Database (Denmark)

    Rahmati, Seyed Habib A.; Ahmadi, Abbas; Govindan, Kannan

    2018-01-01

    the level of the system optimization. By means of this equipment, managers can benefit from a condition-based maintenance (CBM) for monitoring and managing their system. The chief aim of the paper is to develop a stochastic maintenance problem based on CBM activities engaged with a complex applied......Integrated consideration of production planning and maintenance processes is a real world assumption. Specifically, by improving the monitoring equipment such as various sensors or product-embedded information devices in recent years, joint assessment of these processes is inevitable for enhancing...... production problem called flexible job shop scheduling problem (FJSP). This integrated problem considers two maintenance scenarios in terms of corrective maintenance (CM) and preventive maintenance (PM). The activation of scenario is done by monitoring the degradation condition of the system and comparing...

  19. Machine Maintenance Scheduling with Reliability Engineering Method and Maintenance Value Stream Mapping

    Science.gov (United States)

    Sembiring, N.; Nasution, A. H.

    2018-02-01

    Corrective maintenance i.e replacing or repairing the machine component after machine break down always done in a manufacturing company. It causes the production process must be stopped. Production time will decrease due to the maintenance team must replace or repair the damage machine component. This paper proposes a preventive maintenance’s schedule for a critical component of a critical machine of an crude palm oil and kernel company due to increase maintenance efficiency. The Reliability Engineering & Maintenance Value Stream Mapping is used as a method and a tool to analize the reliability of the component and reduce the wastage in any process by segregating value added and non value added activities.

  20. A multi-criteria model for maintenance job scheduling

    Directory of Open Access Journals (Sweden)

    Sunday A. Oke

    2007-12-01

    Full Text Available This paper presents a multi-criteria maintenance job scheduling model, which is formulated using a weighted multi-criteria integer linear programming maintenance scheduling framework. Three criteria, which have direct relationship with the primary objectives of a typical production setting, were used. These criteria are namely minimization of equipment idle time, manpower idle time and lateness of job with unit parity. The mathematical model constrained by available equipment, manpower and job available time within planning horizon was tested with a 10-job, 8-hour time horizon problem with declared equipment and manpower available as against the required. The results, analysis and illustrations justify multi-criteria consideration. Thus, maintenance managers are equipped with a tool for adequate decision making that guides against error in the accumulated data which may lead to wrong decision making. The idea presented is new since it provides an approach that has not been documented previously in the literature.

  1. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  2. Aging based maintenance and reinvestment scheduling of electric distribution

    Energy Technology Data Exchange (ETDEWEB)

    Korpijarvi, J.

    2012-07-01

    The maintenance of electric distribution network is a topical question for distribution system operators because of increasing significance of failure costs. In this dissertation the maintenance practices of the distribution system operators are analyzed and a theory for scheduling maintenance activities and reinvestment of distribution components is created. The scheduling is based on the deterioration of components and the increasing failure rates due to aging. The dynamic programming algorithm is used as a solving method to maintenance problem which is caused by the increasing failure rates of the network. The other impacts of network maintenance like environmental and regulation reasons are not included to the scope of this thesis. Further the tree trimming of the corridors and the major disturbance of the network are not included to the problem optimized in this thesis. For optimizing, four dynamic programming models are presented and the models are tested. Programming is made in VBA-language to the computer. For testing two different kinds of test networks are used. Because electric distribution system operators want to operate with bigger component groups, optimal timing for component groups is also analyzed. A maintenance software package is created to apply the presented theories in practice. An overview of the program is presented (orig.)

  3. Distributed decision-making in electric power system transmission maintenance scheduling using multi-agent systems (MAS)

    Science.gov (United States)

    Zhang, Zhong

    In this work, motivated by the need to coordinate transmission maintenance scheduling among a multiplicity of self-interested entities in restructured power industry, a distributed decision support framework based on multiagent negotiation systems (MANS) is developed. An innovative risk-based transmission maintenance optimization procedure is introduced. Several models for linking condition monitoring information to the equipment's instantaneous failure probability are presented, which enable quantitative evaluation of the effectiveness of maintenance activities in terms of system cumulative risk reduction. Methodologies of statistical processing, equipment deterioration evaluation and time-dependent failure probability calculation are also described. A novel framework capable of facilitating distributed decision-making through multiagent negotiation is developed. A multiagent negotiation model is developed and illustrated that accounts for uncertainty and enables social rationality. Some issues of multiagent negotiation convergence and scalability are discussed. The relationships between agent-based negotiation and auction systems are also identified. A four-step MAS design methodology for constructing multiagent systems for power system applications is presented. A generic multiagent negotiation system, capable of inter-agent communication and distributed decision support through inter-agent negotiations, is implemented. A multiagent system framework for facilitating the automated integration of condition monitoring information and maintenance scheduling for power transformers is developed. Simulations of multiagent negotiation-based maintenance scheduling among several independent utilities are provided. It is shown to be a viable alternative solution paradigm to the traditional centralized optimization approach in today's deregulated environment. This multiagent system framework not only facilitates the decision-making among competing power system entities, but

  4. Scheduling Maintenance Jobs in Networks

    OpenAIRE

    Abed, Fidaa; Chen, Lin; Disser, Yann; Groß, Martin; Megow, Nicole; Meißner, Julie; Richter, Alexander T.; Rischke, Roman

    2017-01-01

    We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time; for the special case of path networks, this is related to the problem of minimizing the busy time of machines. We show that the problem can be solved in polynomial time in arbitrary networks if preemption is allowed. If preemption is restricted to integral t...

  5. Coordination between Generation and Transmission Maintenance Scheduling by Means of Multi-agent Technique

    Science.gov (United States)

    Nagata, Takeshi; Tao, Yasuhiro; Utatani, Masahiro; Sasaki, Hiroshi; Fujita, Hideki

    This paper proposes a multi-agent approach to maintenance scheduling in restructured power systems. The restructuring of electric power industry has resulted in market-based approaches for unbundling a multitude of service provided by self-interested entities such as power generating companies (GENCOs), transmission providers (TRANSCOs) and distribution companies (DISCOs). The Independent System Operator (ISO) is responsible for the security of the system operation. The schedule submitted to ISO by GENCOs and TRANSCOs should satisfy security and reliability constraints. The proposed method consists of several GENCO Agents (GAGs), TARNSCO Agents (TAGs) and a ISO Agent(IAG). The IAG’s role in maintenance scheduling is limited to ensuring that the submitted schedules do not cause transmission congestion or endanger the system reliability. From the simulation results, it can be seen the proposed multi-agent approach could coordinate between generation and transmission maintenance schedules.

  6. Preventive maintenance scheduling by variable dimension evolutionary algorithms

    International Nuclear Information System (INIS)

    Limbourg, Philipp; Kochs, Hans-Dieter

    2006-01-01

    Black box optimization strategies have been proven to be useful tools for solving complex maintenance optimization problems. There has been a considerable amount of research on the right choice of optimization strategies for finding optimal preventive maintenance schedules. Much less attention is turned to the representation of the schedule to the algorithm. Either the search space is represented as a binary string leading to highly complex combinatorial problem or maintenance operations are defined by regular intervals which may restrict the search space to suboptimal solutions. An adequate representation however is vitally important for result quality. This work presents several nonstandard input representations and compares them to the standard binary representation. An evolutionary algorithm with extensions to handle variable length genomes is used for the comparison. The results demonstrate that two new representations perform better than the binary representation scheme. A second analysis shows that the performance may be even more increased using modified genetic operators. Thus, the choice of alternative representations leads to better results in the same amount of time and without any loss of accuracy

  7. Strategic Maintenance Scheduling of an Offshore Wind Farm in a Deregulated Power System

    Directory of Open Access Journals (Sweden)

    Peyman Mazidi

    2017-03-01

    Full Text Available This paper proposes a model for strategic maintenance scheduling of offshore wind farms (SMSOWF in a deregulated power system. The objective of the model is to plan the maintenance schedules in a way to maximize the profit of the offshore wind farm. In addition, some network constraints, such as transmission lines capacity, and wind farm constraints, such as labor working shift, wave height limit and wake effect, as well as unexpected outages, are included in deterministic and stochastic studies. Moreover, the proposedmodel provides theability to incorporate information from condition monitoring systems. SMSOWF is formulated through a bi-level formulation and then transformed into a single-level through Karush–Kuhn–Tucker conditions. The model is validated through a test system, and the results demonstrate applicability, advantages and challenges of harnessing the full potential of the model.

  8. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  9. Comparison of genetic algorithm and harmony search for generator maintenance scheduling

    International Nuclear Information System (INIS)

    Khan, L.; Mumtaz, S.; Khattak, A.

    2012-01-01

    GMS (Generator Maintenance Scheduling) ranks very high in decision making of power generation management. Generators maintenance schedule decides the time period of maintenance tasks and a reliable reserve margin is also maintained during this time period. In this paper, a comparison of GA (Genetic Algorithm) and US (Harmony Search) algorithm is presented to solve generators maintenance scheduling problem for WAPDA (Water And Power Development Authority) Pakistan. GA is a search procedure, which is used in search problems to compute exact and optimized solution. GA is considered as global search heuristic technique. HS algorithm is quite efficient, because the convergence rate of this algorithm is very fast. HS algorithm is based on the concept of music improvisation process of searching for a perfect state of harmony. The two algorithms generate feasible and optimal solutions and overcome the limitations of the conventional methods including extensive computational effort, which increases exponentially as the size of the problem increases. The proposed methods are tested, validated and compared on the WAPDA electric system. (author)

  10. Measuring robustness of port plug maintenance schedules in fusion remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Schoen, P.W., E-mail: p.w.schoen@heemskerk-innovative.nl [Heemskerk Innovative Technology, Sassenheim (Netherlands); Thomas, J. [CCFE EURATOM/CCFE Fusion Association, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Boessenkool, H. [FOM Institute DIFFER, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Heemskerk, C.J.M. [Heemskerk Innovative Technology, Sassenheim (Netherlands)

    2015-12-15

    Unexpected events during maintenance operations of a fusion plant like JET or ITER may require rescheduling, suspending the execution of the current procedure to pick it up later. In this paper, we look at how the introduction of slack influences the port plug maintenance schedule robustness. We introduce a metrics to measure the robustness. Simulating disruptions we evaluate the effect on a schedule. Finally, we show how the robustness is affected when introducing different amounts of slack.

  11. Measuring robustness of port plug maintenance schedules in fusion remote handling

    International Nuclear Information System (INIS)

    Schoen, P.W.; Thomas, J.; Boessenkool, H.; Heemskerk, C.J.M.

    2015-01-01

    Unexpected events during maintenance operations of a fusion plant like JET or ITER may require rescheduling, suspending the execution of the current procedure to pick it up later. In this paper, we look at how the introduction of slack influences the port plug maintenance schedule robustness. We introduce a metrics to measure the robustness. Simulating disruptions we evaluate the effect on a schedule. Finally, we show how the robustness is affected when introducing different amounts of slack.

  12. An optimal dynamic interval preventive maintenance scheduling for series systems

    International Nuclear Information System (INIS)

    Gao, Yicong; Feng, Yixiong; Zhang, Zixian; Tan, Jianrong

    2015-01-01

    This paper studies preventive maintenance (PM) with dynamic interval for a multi-component system. Instead of equal interval, the time of PM period in the proposed dynamic interval model is not a fixed constant, which varies from interval-down to interval-up. It is helpful to reduce the outage loss on frequent repair parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency, when compared to a periodic PM scheme. According to the definition of dynamic interval, the reliability of system is analyzed from the failure mechanisms of its components and the different effects of non-periodic PM actions on the reliability of the components. Following the proposed model of reliability, a novel framework for solving the non-periodical PM schedule with dynamic interval based on the multi-objective genetic algorithm is proposed. The framework denotes the strategies include updating strategy, deleting strategy, inserting strategy and moving strategy, which is set to correct the invalid population individuals of the algorithm. The values of the dynamic interval and the selections of PM action for the components on every PM stage are determined by achieving a certain level of system availability with the minimum total PM-related cost. Finally, a typical rotary table system of NC machine tool is used as an example to describe the proposed method. - Highlights: • A non-periodic preventive maintenance scheduling model is proposed. • A framework for solving the non-periodical PM schedule problem is developed. • The interval of non-periodic PM is flexible and schedule can be better adjusted. • Dynamic interval leads to more efficient solutions than fixed interval does

  13. A PSO approach for preventive maintenance scheduling optimization

    International Nuclear Information System (INIS)

    Pereira, C.M.N.A.; Lapa, C.M.F.; Mol, A.C.A.; Luz, A.F. da

    2009-01-01

    This work presents a Particle Swarm Optimization (PSO) approach for preventive maintenance policy optimization, focused in reliability and cost. The probabilistic model for reliability and cost evaluation is developed in such a way that flexible intervals between maintenance are allowed. As PSO is skilled for realcoded continuous spaces, a non-conventional codification has been developed in order to allow PSO to solve scheduling problems (which is discrete) with variable number of maintenance interventions. In order to evaluate the proposed methodology, the High Pressure Injection System (HPIS) of a typical 4-loop PWR has been considered. Results demonstrate ability in finding optimal solutions, for which expert knowledge had to be automatically discovered by PSO. (author)

  14. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling - abstract

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  15. Single machine scheduling with time-dependent linear deterioration and rate-modifying maintenance

    OpenAIRE

    Rustogi, Kabir; Strusevich, Vitaly A.

    2015-01-01

    We study single machine scheduling problems with linear time-dependent deterioration effects and maintenance activities. Maintenance periods (MPs) are included into the schedule, so that the machine, that gets worse during the processing, can be restored to a better state. We deal with a job-independent version of the deterioration effects, that is, all jobs share a common deterioration rate. However, we introduce a novel extension to such models and allow the deterioration rates to change af...

  16. Multi-objective group scheduling optimization integrated with preventive maintenance

    Science.gov (United States)

    Liao, Wenzhu; Zhang, Xiufang; Jiang, Min

    2017-11-01

    This article proposes a single-machine-based integration model to meet the requirements of production scheduling and preventive maintenance in group production. To describe the production for identical/similar and different jobs, this integrated model considers the learning and forgetting effects. Based on machine degradation, the deterioration effect is also considered. Moreover, perfect maintenance and minimal repair are adopted in this integrated model. The multi-objective of minimizing total completion time and maintenance cost is taken to meet the dual requirements of delivery date and cost. Finally, a genetic algorithm is developed to solve this optimization model, and the computation results demonstrate that this integrated model is effective and reliable.

  17. Scheduling a maintenance activity under skills constraints to minimize total weighted tardiness and late tasks

    Directory of Open Access Journals (Sweden)

    Djalal Hedjazi

    2015-04-01

    Full Text Available Skill management is a key factor in improving effectiveness of industrial companies, notably their maintenance services. The problem considered in this paper concerns scheduling of maintenance tasks under resource (maintenance teams constraints. This problem is generally known as unrelated parallel machine scheduling. We consider the problem with a both objectives of minimizing total weighted tardiness (TWT and number of tardiness tasks. Our interest is focused particularly on solving this problem under skill constraints, which each resource has a skill level. So, we propose a new efficient heuristic to obtain an approximate solution for this NP-hard problem and demonstrate his effectiveness through computational experiments. This heuristic is designed for implementation in a static maintenance scheduling problem (with unequal release dates, processing times and resource skills, while minimizing objective functions aforementioned.

  18. Stochastic short-term maintenance scheduling of GENCOs in an oligopolistic electricity market

    International Nuclear Information System (INIS)

    Fotouhi Ghazvini, Mohammad Ali; Canizes, Bruno; Vale, Zita; Morais, Hugo

    2013-01-01

    Highlights: ► Decision making under uncertainty. ► Stochastic Mixed Integer Quadratic Programming applied to short-term maintenance scheduling. ► Outage scheduling in Oligopolistic electricity markets. ► Generation companies maintenance scheduling. -- Abstract: In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with LT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO.

  19. Nuclear Power Plant Preventive Maintenance Scheduling Problem with Fuzziness

    International Nuclear Information System (INIS)

    Abass, S.A.; Abdallah, A.S.

    2013-01-01

    Maintenance activity is regarded as the most important key factor for the safety, reliability and economy of a nuclear power plant. Preventive maintenance refers to set of planned activities which include nondestructive testing and periodic inspection as well as maintenance. In this paper, we address the problem of nuclear power plant preventive maintenance scheduling with uncertainty. The uncertainty will be represented by fuzzy parameters. The problem is how to determine the period for which generating units of an electric system should be taken off line for planned preventive maintenance over specific time horizon. Preventive maintenance activity of a nuclear power plant is an important issue as it designed to extend the plant life . It is more required to review the maintenance not only from the view point of safety and reliability but also economy. Preventive maintenance program exists to ensure that nuclear safety significant equipment will function when it is supposed to. Also this problem is extremely important because a failure in a power plant may cause a general breakdown in an electric network. In this paper a mixed integer programming model is used to express this problem. In proposed model power demand is taken as fuzzy parameters. A case study is provided to demonstrate the efficiency of the proposed model.

  20. Performance deterioration modeling and optimal preventive maintenance strategy under scheduled servicing subject to mission time

    Directory of Open Access Journals (Sweden)

    Li Dawei

    2014-08-01

    Full Text Available Servicing is applied periodically in practice with the aim of restoring the system state and prolonging the lifetime. It is generally seen as an imperfect maintenance action which has a chief influence on the maintenance strategy. In order to model the maintenance effect of servicing, this study analyzes the deterioration characteristics of system under scheduled servicing. And then the deterioration model is established from the failure mechanism by compound Poisson process. On the basis of the system damage value and failure mechanism, the failure rate refresh factor is proposed to describe the maintenance effect of servicing. A maintenance strategy is developed which combines the benefits of scheduled servicing and preventive maintenance. Then the optimization model is given to determine the optimal servicing period and preventive maintenance time, with an objective to minimize the system expected life-cycle cost per unit time and a constraint on system survival probability for the duration of mission time. Subject to mission time, it can control the ability of accomplishing the mission at any time so as to ensure the high dependability. An example of water pump rotor relating to scheduled servicing is introduced to illustrate the failure rate refresh factor and the proposed maintenance strategy. Compared with traditional methods, the numerical results show that the failure rate refresh factor can describe the maintenance effect of servicing more intuitively and objectively. It also demonstrates that this maintenance strategy can prolong the lifetime, reduce the total lifetime maintenance cost and guarantee the dependability of system.

  1. Reusable rocket engine preventive maintenance scheduling using genetic algorithm

    International Nuclear Information System (INIS)

    Chen, Tao; Li, Jiawen; Jin, Ping; Cai, Guobiao

    2013-01-01

    This paper deals with the preventive maintenance (PM) scheduling problem of reusable rocket engine (RRE), which is different from the ordinary repairable systems, by genetic algorithm. Three types of PM activities for RRE are considered and modeled by introducing the concept of effective age. The impacts of PM on all subsystems' aging processes are evaluated based on improvement factor model. Then the reliability of engine is formulated by considering the accumulated time effect. After that, optimization model subjected to reliability constraint is developed for RRE PM scheduling at fixed interval. The optimal PM combination is obtained by minimizing the total cost in the whole life cycle for a supposed engine. Numerical investigations indicate that the subsystem's intrinsic reliability characteristic and the improvement factor of maintain operations are the most important parameters in RRE's PM scheduling management

  2. The engine maintenance scheduling by using reliability centered maintenance method and the identification of 5S application in PT. XYZ

    Science.gov (United States)

    Sembiring, N.; Panjaitan, N.; Saragih, A. F.

    2018-02-01

    PT. XYZ is a manufacturing company that produces fresh fruit bunches (FFB) to Crude Palm Oil (CPO) and Palm Kernel Oil (PKO). PT. XYZ consists of six work stations: receipt station, sterilizing station, thressing station, pressing station, clarification station, and kernelery station. So far, the company is still implementing corrective maintenance maintenance system for production machines where the machine repair is done after damage occurs. Problems at PT. XYZ is the absence of scheduling engine maintenance in a planned manner resulting in the engine often damaged which can disrupt the smooth production. Another factor that is the problem in this research is the kernel station environment that becomes less convenient for operators such as there are machines and equipment not used in the production area, slippery, muddy, scattered fibers, incomplete use of PPE, and lack of employee discipline. The most commonly damaged machine is in the seed processing station (kernel station) which is cake breaker conveyor machine. The solution of this problem is to propose a schedule plan for maintenance of the machine by using the method of reliability centered maintenance and also the application of 5S. The result of the application of Reliability Centered maintenance method is obtained four components that must be treated scheduled (time directed), namely: for bearing component is 37 days, gearbox component is 97 days, CBC pen component is 35 days and conveyor pedal component is 32 days While after identification the application of 5S obtained the proposed corporate environmental improvement measures in accordance with the principles of 5S where unused goods will be moved from the production area, grouping goods based on their use, determining the procedure of cleaning the production area, conducting inspection in the use of PPE, and making 5S slogans.

  3. BINARY PARTICLE SWARM OPTIMIZATION APPROACH FOR RANDOM GENERATION OUTAGE MAINTENANCE SCHEDULING

    Directory of Open Access Journals (Sweden)

    K. Suresh

    2013-01-01

    Full Text Available This paper presents a methodology for maintenance scheduling (MS of generators using binary particle swarm optimization (BPSO based probabilistic approach. The objective of this paper is to reduce the loss of load probability (LOLP for a power system. The capacity outage probability table (COPT is the initial step in creating maintenance schedule using the probabilistic levelized risk method. This paper proposes BPSO method which is used to construct the COPT. In order to mitigate the effects of probabilistic levelized risk method, BPSO based probabilistic levelized risk method is embarked on a MS problem. In order to validate the effectiveness of the proposed algorithm, case study results for simple five unit system can accomplish a significant levelization in the reliability indices that make possible to evaluate system generation system adequacy in the MS horizon of the power system. The proposed method shows better performance compared with other optimization methods and conventional method with improved search performance.

  4. A probabilistic computational framework for bridge network optimal maintenance scheduling

    International Nuclear Information System (INIS)

    Bocchini, Paolo; Frangopol, Dan M.

    2011-01-01

    This paper presents a probabilistic computational framework for the Pareto optimization of the preventive maintenance applications to bridges of a highway transportation network. The bridge characteristics are represented by their uncertain reliability index profiles. The in/out of service states of the bridges are simulated taking into account their correlation structure. Multi-objective Genetic Algorithms have been chosen as numerical tool for the solution of the optimization problem. The design variables of the optimization are the preventive maintenance schedules of all the bridges of the network. The two conflicting objectives are the minimization of the total present maintenance cost and the maximization of the network performance indicator. The final result is the Pareto front of optimal solutions among which the managers should chose, depending on engineering and economical factors. A numerical example illustrates the application of the proposed approach.

  5. Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-04-01

    Full Text Available This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.

  6. A manpower scheduling heuristic for aircraft maintenance application

    Science.gov (United States)

    Sze, San-Nah; Sze, Jeeu-Fong; Chiew, Kang-Leng

    2012-09-01

    This research studies a manpower scheduling for aircraft maintenance, focusing on in-flight food loading operation. A group of loading teams with flexible shifts is required to deliver and upload packaged meals from the ground kitchen to aircrafts in multiple trips. All aircrafts must be served within predefined time windows. The scheduling process takes into account of various constraints such as meal break allocation, multi-trip traveling and food exposure time limit. Considering the aircrafts movement and predefined maximum working hours for each loading team, the main objective of this study is to form an efficient roster by assigning a minimum number of loading teams to the aircrafts. We proposed an insertion based heuristic to generate the solutions in a short period of time for large instances. This proposed algorithm is implemented in various stages for constructing trips due to the presence of numerous constraints. The robustness and efficiency of the algorithm is demonstrated in computational results. The results show that the insertion heuristic more efficiently outperforms the company's current practice.

  7. Comparative study of heuristics algorithms in solving flexible job shop scheduling problem with condition based maintenance

    Directory of Open Access Journals (Sweden)

    Yahong Zheng

    2014-05-01

    Full Text Available Purpose: This paper focuses on a classic optimization problem in operations research, the flexible job shop scheduling problem (FJSP, to discuss the method to deal with uncertainty in a manufacturing system.Design/methodology/approach: In this paper, condition based maintenance (CBM, a kind of preventive maintenance, is suggested to reduce unavailability of machines. Different to the simultaneous scheduling algorithm (SSA used in the previous article (Neale & Cameron,1979, an inserting algorithm (IA is applied, in which firstly a pre-schedule is obtained through heuristic algorithm and then maintenance tasks are inserted into the pre-schedule scheme.Findings: It is encouraging that a new better solution for an instance in benchmark of FJSP is obtained in this research. Moreover, factually SSA used in literature for solving normal FJSPPM (FJSP with PM is not suitable for the dynamic FJSPPM. Through application in the benchmark of normal FJSPPM, it is found that although IA obtains inferior results compared to SSA used in literature, it performs much better in executing speed.Originality/value: Different to traditional scheduling of FJSP, uncertainty of machines is taken into account, which increases the complexity of the problem. An inserting algorithm (IA is proposed to solve the dynamic scheduling problem. It is stated that the quality of the final result depends much on the quality of the pre-schedule obtained during the procedure of solving a normal FJSP. In order to find the best solution of FJSP, a comparative study of three heuristics is carried out, the integrated GA, ACO and ABC. In the comparative study, we find that GA performs best in the three heuristic algorithms. Meanwhile, a new better solution for an instance in benchmark of FJSP is obtained in this research.

  8. Constrained non-linear multi-objective optimisation of preventive maintenance scheduling for offshore wind farms

    Science.gov (United States)

    Zhong, Shuya; Pantelous, Athanasios A.; Beer, Michael; Zhou, Jian

    2018-05-01

    Offshore wind farm is an emerging source of renewable energy, which has been shown to have tremendous potential in recent years. In this blooming area, a key challenge is that the preventive maintenance of offshore turbines should be scheduled reasonably to satisfy the power supply without failure. In this direction, two significant goals should be considered simultaneously as a trade-off. One is to maximise the system reliability and the other is to minimise the maintenance related cost. Thus, a non-linear multi-objective programming model is proposed including two newly defined objectives with thirteen families of constraints suitable for the preventive maintenance of offshore wind farms. In order to solve our model effectively, the nondominated sorting genetic algorithm II, especially for the multi-objective optimisation is utilised and Pareto-optimal solutions of schedules can be obtained to offer adequate support to decision-makers. Finally, an example is given to illustrate the performances of the devised model and algorithm, and explore the relationships of the two targets with the help of a contrast model.

  9. Considerations on operation schedule and maintenance aspects of FCC-hh

    CERN Document Server

    Niemi, Arto; Foraz, Katy

    2018-01-01

    The Future Circular Hadron Collider (FCC-hh) has ambitious goals for integrated luminosity production. Reaching these goals requires reducing the time for planned technical stops and commissioning, compared to the LHC. This note describes potential options for an FCC-hh operation schedule. Special attention is given to considerations on how to accomplish the required maintenance activities in a limited time frame. The note recommends to study further the feasibility and cost-efficiency of operating without annual stops and longer intervals between long shutdowns.

  10. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  11. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  12. Application of genetic algorithms to the maintenance scheduling optimization in a nuclear system basing on reliability

    International Nuclear Information System (INIS)

    Lapa, Celso M. Franklin; Pereira, Claudio M.N.A.; Mol, Antonio C. de Abreu

    1999-01-01

    This paper presents a solution based on genetic algorithm and probabilistic safety analysis that can be applied in the optimization of the preventive maintenance politic of nuclear power plant safety systems. The goal of this approach is to improve the average availability of the system through the optimization of the preventive maintenance scheduling politic. The auxiliary feed water system of a two loops pressurized water reactor is used as a sample case, in order to demonstrate the effectiveness of the proposed method. The results, when compared to those obtained by some standard maintenance politics, reveal quantitative gains and operational safety levels. (author)

  13. Maintenance scheduling of a manufacturing system subject to deterioration

    International Nuclear Information System (INIS)

    Ahmadi, Reza; Newby, Martin

    2011-01-01

    This paper presents an integrated model for the joint determination of both optimal inspection strategy and optimal repair policy for a manufacturing system whose resulting output is subject to system state. An appropriate maintenance strategy is essential to optimize revenue from a manufacturing system which is in continuous operation and subject to deterioration. The optimum policy balances the amount of maintenance required to increase availability against the loss of revenue arising from the down time: insufficient maintenance leads to an increase in the number of defective items, low profit and low maintenance cost; excessive maintenance results in a reduction in the proportion of defective items, high profit and high maintenance cost. In this paper, an intensity control model adapted to partial information provides an optimal inspection intensity and repair degree of the system as an optimal control process to yield maximum revenue. The solution is obtained through formulating an equivalent deterministic Hamilton-Jacobi equation. A numerical example is provided to illustrate the behavior of the optimal control process. The optimal control process determines a solution to both optimum inspection frequency and optimal replacement policy which results in an optimal production run length of the system. - Highlights: → We develop an optimum asset management strategy based on the revenue generated by the asset. → The optimum strategy controls the intensity, rate of occurrence, of interruptions to service. → The decisions are based on partial observation of the system and do not need perfect information. There is no need for continuous monitoring of the system.

  14. Reliability-based optimization of maintenance scheduling of mechanical components under fatigue

    Science.gov (United States)

    Beaurepaire, P.; Valdebenito, M.A.; Schuëller, G.I.; Jensen, H.A.

    2012-01-01

    This study presents the optimization of the maintenance scheduling of mechanical components under fatigue loading. The cracks of damaged structures may be detected during non-destructive inspection and subsequently repaired. Fatigue crack initiation and growth show inherent variability, and as well the outcome of inspection activities. The problem is addressed under the framework of reliability based optimization. The initiation and propagation of fatigue cracks are efficiently modeled using cohesive zone elements. The applicability of the method is demonstrated by a numerical example, which involves a plate with two holes subject to alternating stress. PMID:23564979

  15. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  16. Multiobjective Joint Optimization of Production Scheduling and Maintenance Planning in the Flexible Job-Shop Problem

    Directory of Open Access Journals (Sweden)

    Jianfei Ye

    2015-01-01

    Full Text Available In order to solve the joint optimization of production scheduling and maintenance planning problem in the flexible job-shop, a multiobjective joint optimization model considering the maximum completion time and maintenance costs per unit time is established based on the concept of flexible job-shop and preventive maintenance. A weighted sum method is adopted to eliminate the index dimension. In addition, a double-coded genetic algorithm is designed according to the problem characteristics. The best result under the circumstances of joint decision-making is obtained through multiple simulation experiments, which proves the validity of the algorithm. We can prove the superiority of joint optimization model by comparing the result of joint decision-making project with the result of independent decision-making project under fixed preventive maintenance period. This study will enrich and expand the theoretical framework and analytical methods of this problem; it provides a scientific decision analysis method for enterprise to make production plan and maintenance plan.

  17. JIT single machine scheduling problem with periodic preventive maintenance

    Science.gov (United States)

    Shahriari, Mohammadreza; Shoja, Naghi; Zade, Amir Ebrahimi; Barak, Sasan; Sharifi, Mani

    2016-09-01

    This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, two other optimization algorithms are used for comparing the results. Eventually, Taguchi method with metrics analysis is presented to tune the algorithms' parameters and a multiple criterion decision making technique based on the technique for order of preference by similarity to ideal solution is applied to choose the best algorithm. Comparison results confirmed the supremacy of MOPSO to the other algorithms.

  18. Value of information in sequential decision making: Component inspection, permanent monitoring and system-level scheduling

    International Nuclear Information System (INIS)

    Memarzadeh, Milad; Pozzi, Matteo

    2016-01-01

    We illustrate how to assess the Value of Information (VoI) in sequential decision making problems modeled by Partially Observable Markov Decision Processes (POMDPs). POMDPs provide a general framework for modeling the management of infrastructure components, including operation and maintenance, when only partial or noisy observations are available; VoI is a key concept for selecting explorative actions, with application to component inspection and monitoring. Furthermore, component-level VoI can serve as an effective heuristic for assigning priorities to system-level inspection scheduling. We introduce two alternative models for the availability of information, and derive the VoI in each of those settings: the Stochastic Allocation (SA) model assumes that observations are collected with a given probability, while the Fee-based Allocation model (FA) assumes that they are available at a given cost. After presenting these models at component-level, we investigate how they perform for system-level inspection scheduling. - Highlights: • On the Value of Information in POMDPs, for optimal exploration of systems. • A method for assessing the Value of Information of permanent monitoring. • A method for allocating inspections in systems made up by parallel POMDPs.

  19. 48 CFR 49.602-3 - Schedule of accounting information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Schedule of accounting information. 49.602-3 Section 49.602-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... accounting information. Standard Form 1439, Schedule of Accounting Information, shall be filed in support of...

  20. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  1. 77 FR 488 - Control of Emissions From New Highway Vehicles and Engines; Approval of New Scheduled Maintenance...

    Science.gov (United States)

    2012-01-05

    ... (e.g., dump trucks, concrete mixers, refuse trucks, and other centrally-fueled vehicles) were... intervals for DEF-based SCR. For vocational vehicles such as dump trucks, concrete mixers, refuse trucks and... Engines; Approval of New Scheduled Maintenance for Selective Catalytic Reduction Technologies AGENCY...

  2. Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel

    Science.gov (United States)

    Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi

    Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.

  3. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  4. Pavement maintenance scheduling using genetic algorithms

    OpenAIRE

    Yang, Chao; Remenyte-Prescott, Rasa; Andrews, John D.

    2015-01-01

    This paper presents a new pavement management system (PMS) to achieve the optimal pavement maintenance and rehabilitation (M&R) strategy for a highway network using genetic algorithms (GAs). Optimal M&R strategy is a set of pavement activities that both minimise the maintenance cost of a highway network and maximise the pavement condition of the road sections on the network during a certain planning period. NSGA-II, a multi-objective GA, is employed to perform pavement maintenance optimisatio...

  5. Information Technology Applications to Maintenance Management

    Institute of Scientific and Technical Information of China (English)

    Abdul Raouf S.I.

    2003-01-01

    Application of IT (Information Technology) to equipment management have not been ade-quately made. A system using Benefit Evaluation Ladder is described for evaluating the need for IT ap-plications to maintenance management. A systematic evaluation scheme for Computerized Maintenance Management System (CMMS) is presented.

  6. Information-Based Maintenance Optimization with Focus on Predictive Maintenance (Informatiegebaseerde onderhoudsoptimalisatie met focus op predictief onderhoud)

    OpenAIRE

    Van Horenbeek, Adriaan

    2013-01-01

    This dissertation presents an information-based maintenance optimization methodology for physical assets; with focus on, but not limited to, predictive maintenance (PdM). The overall concept of information-based maintenance is that of updating maintenance decisions based on evolving knowledge of operation history and anticipated usage of the machinery, as well as the physics and dynamics of material degradation in critical machinery components. Within this concept, predictive maintenance is a...

  7. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  8. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  9. A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems

    Science.gov (United States)

    Moghaddam, Kamran S.; Usher, John S.

    2011-07-01

    In this article, a new multi-objective optimization model is developed to determine the optimal preventive maintenance and replacement schedules in a repairable and maintainable multi-component system. In this model, the planning horizon is divided into discrete and equally-sized periods in which three possible actions must be planned for each component, namely maintenance, replacement, or do nothing. The objective is to determine a plan of actions for each component in the system while minimizing the total cost and maximizing overall system reliability simultaneously over the planning horizon. Because of the complexity, combinatorial and highly nonlinear structure of the mathematical model, two metaheuristic solution methods, generational genetic algorithm, and a simulated annealing are applied to tackle the problem. The Pareto optimal solutions that provide good tradeoffs between the total cost and the overall reliability of the system can be obtained by the solution approach. Such a modeling approach should be useful for maintenance planners and engineers tasked with the problem of developing recommended maintenance plans for complex systems of components.

  10. Maintenance of radiation safety information system

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Ho Sun [Korea Institute of Nuclear Safety, Taejon (Korea, Republic of); Park, Moon Il; Chung, Chong Kyu; Lim, Bock Soo; Kim, Hyung Uk; Chang, Kwang Il; Nam, Kwan Hyun; Cho, Hye Ryan [AD center incubation LAB, Taejon (Korea, Republic of)

    2001-12-15

    The objectives of radiation safety information system maintenance are to maintain the requirement of users, change of job process and upgrade of the system performance stably and effectively while system maintenance. We conduct the code of conduct recommended by IAEA, management of radioisotope inventory database systematically using analysis for the state of inventory database integrated in this system. This system and database will be support the regulatory guidance, rule making and information to the MOST, KINS, other regulatory related organization and general public optimizationally.

  11. Three AREVA tools for maintenance and outage support

    International Nuclear Information System (INIS)

    Lumpe, A.

    2012-01-01

    WlS is a knowledge-based database for the support of nuclear maintenance for components of different types It is productive since 2004 and has been continuously developed according to customer requirements. WIS allows for a centralized management of maintenance information and knowledge, including strategies, scheduling and reporting. WIS is already utilized in national and international NPPs. lts main advantages are: Support of service documentation for plant and service company employees, Support of integration into already existing IT infrastructure, Support of information and knowledge sharing, Easy and intuitive information usage, Savings by using standardized approach.

  12. Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: A comparison of results

    International Nuclear Information System (INIS)

    Mohanta, Dusmanta Kumar; Sadhu, Pradip Kumar; Chakrabarti, R.

    2007-01-01

    This paper presents a comparison of results for optimization of captive power plant maintenance scheduling using genetic algorithm (GA) as well as hybrid GA/simulated annealing (SA) techniques. As utilities catered by captive power plants are very sensitive to power failure, therefore both deterministic and stochastic reliability objective functions have been considered to incorporate statutory safety regulations for maintenance of boilers, turbines and generators. The significant contribution of this paper is to incorporate stochastic feature of generating units and that of load using levelized risk method. Another significant contribution of this paper is to evaluate confidence interval for loss of load probability (LOLP) because some variations from optimum schedule are anticipated while executing maintenance schedules due to different real-life unforeseen exigencies. Such exigencies are incorporated in terms of near-optimum schedules obtained from hybrid GA/SA technique during the final stages of convergence. Case studies corroborate that same optimum schedules are obtained using GA and hybrid GA/SA for respective deterministic and stochastic formulations. The comparison of results in terms of interval of confidence for LOLP indicates that levelized risk method adequately incorporates the stochastic nature of power system as compared with levelized reserve method. Also the interval of confidence for LOLP denotes the possible risk in a quantified manner and it is of immense use from perspective of captive power plants intended for quality power

  13. Using Integer Programming for Airport Service Planning in Staff Scheduling

    Directory of Open Access Journals (Sweden)

    W.H. Ip

    2010-09-01

    Full Text Available Reliability and safety in flight is extremely necessary and that depend on the adoption of proper maintenance system. Therefore, it is essential for aircraft maintenance companies to perform the manpower scheduling efficiently. One of the objectives of this paper is to provide an Integer Programming approach to determine the optimal solutions to aircraft maintenance planning and scheduling and hence the planning and scheduling processes can become more efficient and effective. Another objective is to develop a set of computational schedules for maintenance manpower to cover all scheduled flights. In this paper, a sequential methodology consisting of 3 stages is proposed. They are initial maintenance demand schedule, the maintenance pairing and the maintenance group(s assignment. Since scheduling would split up into different stages, different mathematical techniques have been adopted to cater for their own problem characteristics. Microsoft Excel would be used. Results from the first stage and second stage would be inputted into integer programming model using Microsoft Excel Solver to find the optimal solution. Also, Microsoft Excel VBA is used for devising a scheduling system in order to reduce the manual process and provide a user friendly interface. For the results, all can be obtained optimal solution and the computation time is reasonable and acceptable. Besides, the comparison of the peak time and non-peak time is discussed.

  14. Research on information models for the construction schedule management based on the IFC standard

    Directory of Open Access Journals (Sweden)

    Weirui Xue

    2015-05-01

    Full Text Available Purpose: The purpose of this article is to study the description and extension of the Industry Foundation Classes (IFC standard in construction schedule management, which achieves the information exchange and sharing among the different information systems and stakeholders, and facilitates the collaborative construction in the construction projects. Design/methodology/approach: The schedule information processing and coordination are difficult in the complex construction project. Building Information Modeling (BIM provides the platform for exchanging and sharing information among information systems and stakeholders based on the IFC standard. Through analyzing the schedule plan, implementing, check and control, the information flow in the schedule management is reflected based on the IDEF. According to the IFC4, the information model for the schedule management is established, which not only includes the each aspect of the schedule management, but also includes the cost management, the resource management, the quality management and the risk management. Findings: The information requirement for the construction schedule management can be summarized into three aspects: the schedule plan information, the implementing information and the check and control information. The three aspects can be described through the existing and extended entities of IFC4, and the information models are established. Originality/value: The main contribution of the article is to establish the construction schedule management information model, which achieves the information exchange and share in the construction project, and facilitates the development of the application software to meet the requirements of the construction project.

  15. Research and Development of a Network-Based Intelligent Maintenance Information System

    Institute of Scientific and Technical Information of China (English)

    ZANG Tie-gang; YANG Ming-zhong; GUO Shun-sheng

    2003-01-01

    A maintenance information system is an important part of equipment management. An intelli gent maintenance information system ( IMIS) is a synthesis of network technology, information technology and intelligent technology. The IMIS is used to finish flexible maintenance decision-making and fast maintenance planning, which helps enterprises to effectively reduce maintenance cost and increase working efficiency. Because the IMIS integrates advanced technologies, its performance is better than a traditional one.The difference between an IMIS and a traditional maintenance information system, and the functions, structure, important realizations, and application of an IMIS are discussed in this paper.

  16. Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Seyyed Mohammad Hassan Hosseini

    2016-05-01

    Full Text Available Scheduling problem for the hybrid flow shop scheduling problem (HFSP followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All machines can process all kinds of parts in this stage but each machine can process only one part at the same time. The second stage is a single assembly machine or a single assembly team of workers. The aim is to schedule the parts on the machines and assembly sequence and also determine when the preventive maintenance activities get done in order to minimize the completion time of all products (makespan. A mathematical modeling is presented and its validation is shown by solving an example in small scale. Since this problem has been proved strongly NP-hard, in order to solve the problem in medium and large scale, four heuristic algorithms is proposed based on the Johnson’s algorithm. The numerical experiments are used to run the mathematical model and evaluate the performance of the proposed algorithms.

  17. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  18. Maintenance strategy for tilting table of rolling mill based on reliability considerations

    International Nuclear Information System (INIS)

    Deshpande, V.S.; Modak, J.P.

    2003-01-01

    tilting tables are 14 scheduled on-condition tasks, 10 scheduled on-restoration tasks, seven scheduled discard task. Whereas for 14 failure modes no scheduled maintenance has been proposed. Existing maintenance schedule for tilting tables indicates the maintenance action as and when required. Hence RCM based schedule specifies that additional preventive maintenance tasks need to be executed as compared to none initially. Cost incurred for this can be offset from the savings accrued from reduction in loss of production due to repetitive breakdowns. The methodology of RCM adopted in western industries cannot be applied as it is to Indian industries because of labour oriented nature, partially computerised information systems, non-availability of the information about cost of loss of production due to breakdown and age-reliability pattern of equipment, insufficient maintenance database. These problems can be overcome by development of sound MMIS, formulation of RCM review group and imparting suitable training to acquire the relevant skills in RCM. Thus RCM methodology can be applied to Indian industry for reduction of breakdowns as well as optimisation of preventive maintenance cost. This can further boost up the prospects of Indian industry to offer the products at globally competitive prices

  19. The Offering, Scheduling and Maintenance of Elective Advanced Pharmacy Practice Experiences

    Directory of Open Access Journals (Sweden)

    Rex O. Brown

    2015-12-01

    Full Text Available The Accreditation Council for Pharmacy Education (ACPE provides standards for colleges of pharmacy to assist in the provision of pharmacy education to student pharmacists. An integral part of all college educational programs includes the provision of experiential learning. Experiential learning allows students to gain real-world experience in direct patient care during completion of the curriculum. All college of pharmacy programs provide several Advanced Pharmacy Practice Experiences (APPEs, which include a balance between the four required experiences and a number of other required or elective APPEs. Required APPEs include advanced community, advanced institutional, ambulatory care, and general medicine. The elective APPEs include a myriad of opportunities to help provide a balanced education in experiential learning for student pharmacists. These unique opportunities help to expose student pharmacists to different career tracks that they may not have been able to experience otherwise. Not all colleges offer enough elective APPEs to enable the student pharmacist to obtain experiences in a defined area. Such an approach is required to produce skilled pharmacy graduates that are capable to enter practice in various settings. Elective APPEs are scheduled logically and are based upon student career interest and site availability. This article describes the offering, scheduling and maintenance of different elective APPEs offered by The University of Tennessee College of Pharmacy.

  20. The Development of Plant Maintenance Scheduling Via lnventory System for Sustainable Plant Operation

    Directory of Open Access Journals (Sweden)

    Masripan Roslizan

    2016-01-01

    Full Text Available Industrial sector becomes the main concern for developing country. By the time, it was increased rapidly. However, there are many problems observed such as maintenance scheduling, stock inventory and supply chain. Therefore, this research develops new inventory system to develop sustainable plant operation with a high capability to plant operation especially to stock inventory of machine component. In also required green application with minimised used on paper. This system is developed using Radio Frequency Identification (RFID for inventory control which integrated with web-based system. This system consists of several modules such as station module, item module and item request module and report of critical stock in the store. This system can be controlled from a hand-phone with internet connection or automatic alert such as Short Massage Send (SMS and email. The developed system is very effective in monitoring the stock material through the barcode, supply chain and worker performance as well as to reduce the lead time for maintenance activities of the company through sustainable plant operation.

  1. 48 CFR 53.301-1439 - Schedule of Accounting Information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Schedule of Accounting Information. 53.301-1439 Section 53.301-1439 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Illustrations of Forms 53.301-1439 Schedule of Accounting...

  2. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  3. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  4. Information Flow Scheduling in Concurrent Multi-Product Development Based on DSM

    Science.gov (United States)

    Sun, Qing-Chao; Huang, Wei-Qiang; Jiang, Ying-Jie; Sun, Wei

    2017-09-01

    Multi-product collaborative development is adopted widely in manufacturing enterprise, while the present multi-project planning models don't take technical/data interactions of multiple products into account. To decrease the influence of technical/data interactions on project progresses, the information flow scheduling models based on the extended DSM is presented. Firstly, information dependencies are divided into four types: series, parallel, coupling and similar. Secondly, different types of dependencies are expressed as DSM units, and the extended DSM model is brought forward, described as a block matrix. Furthermore, the information flow scheduling methods is proposed, which involves four types of operations, where partitioning and clustering algorithm are modified from DSM for ensuring progress of high-priority project, merging and converting is the specific computation of the extended DSM. Finally, the information flow scheduling of two machine tools development is analyzed with example, and different project priorities correspond to different task sequences and total coordination cost. The proposed methodology provides a detailed instruction for information flow scheduling in multi-product development, with specially concerning technical/data interactions.

  5. Hybrid Particle Swarm Optimization for Hybrid Flowshop Scheduling Problem with Maintenance Activities

    Science.gov (United States)

    Li, Jun-qing; Pan, Quan-ke; Mao, Kun

    2014-01-01

    A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm. PMID:24883414

  6. Hybrid Particle Swarm Optimization for Hybrid Flowshop Scheduling Problem with Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Jun-qing Li

    2014-01-01

    Full Text Available A hybrid algorithm which combines particle swarm optimization (PSO and iterated local search (ILS is proposed for solving the hybrid flowshop scheduling (HFS problem with preventive maintenance (PM activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron’s benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm.

  7. Hybrid particle swarm optimization for hybrid flowshop scheduling problem with maintenance activities.

    Science.gov (United States)

    Li, Jun-qing; Pan, Quan-ke; Mao, Kun

    2014-01-01

    A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm.

  8. Improved Scheduling Mechanisms for Synchronous Information and Energy Transmission.

    Science.gov (United States)

    Qin, Danyang; Yang, Songxiang; Zhang, Yan; Ma, Jingya; Ding, Qun

    2017-06-09

    Wireless energy collecting technology can effectively reduce the network time overhead and prolong the wireless sensor network (WSN) lifetime. However, the traditional energy collecting technology cannot achieve the balance between ergodic channel capacity and average collected energy. In order to solve the problem of the network transmission efficiency and the limited energy of wireless devices, three improved scheduling mechanisms are proposed: improved signal noise ratio (SNR) scheduling mechanism (IS2M), improved N-SNR scheduling mechanism (INS2M) and an improved Equal Throughput scheduling mechanism (IETSM) for different channel conditions to improve the whole network performance. Meanwhile, the average collected energy of single users and the ergodic channel capacity of three scheduling mechanisms can be obtained through the order statistical theory in Rayleig, Ricean, Nakagami- m and Weibull fading channels. It is concluded that the proposed scheduling mechanisms can achieve better balance between energy collection and data transmission, so as to provide a new solution to realize synchronous information and energy transmission for WSNs.

  9. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  10. Production Planning and Planting Pattern Scheduling Information System for Horticulture

    Science.gov (United States)

    Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu

    2018-02-01

    This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.

  11. SUMO: operation and maintenance management web tool for astronomical observatories

    Science.gov (United States)

    Mujica-Alvarez, Emma; Pérez-Calpena, Ana; García-Vargas, María. Luisa

    2014-08-01

    SUMO is an Operation and Maintenance Management web tool, which allows managing the operation and maintenance activities and resources required for the exploitation of a complex facility. SUMO main capabilities are: information repository, assets and stock control, tasks scheduler, executed tasks archive, configuration and anomalies control and notification and users management. The information needed to operate and maintain the system must be initially stored at the tool database. SUMO shall automatically schedule the periodical tasks and facilitates the searching and programming of the non-periodical tasks. Tasks planning can be visualized in different formats and dynamically edited to be adjusted to the available resources, anomalies, dates and other constrains that can arise during daily operation. SUMO shall provide warnings to the users notifying potential conflicts related to the required personal availability or the spare stock for the scheduled tasks. To conclude, SUMO has been designed as a tool to help during the operation management of a scientific facility, and in particular an astronomical observatory. This is done by controlling all operating parameters: personal, assets, spare and supply stocks, tasks and time constrains.

  12. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    Science.gov (United States)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  13. A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem

    DEFF Research Database (Denmark)

    Pour, Shahrzad M.; Drake, John H.; Ejlertsen, Lena Secher

    2017-01-01

    A railway signaling system is a complex and interdependent system which should ensure the safe operation of trains. We introduce and address a mixed integer optimisation model for the preventive signal maintenance crew scheduling problem in the Danish railway system. The problem contains many...... to feed as ‘warm start’ solutions to a Mixed Integer Programming (MIP) solver for further optimisation. We apply the CP/MIP framework to a section of the Danish rail network and benchmark our results against both direct application of a MIP solver and modelling the problem as a Constraint Optimisation...

  14. Good practices for cost effective maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1997-02-01

    This publication is organized around five areas that were identified by the utilities and government organizations who contributed to this report as most important to them. They are: Increasing production through maintenance activities related to improved plant material condition, reduced duration of planned outages, use of on-line maintenance and reduced frequency of forced outages; reducing workload through avoiding unnecessary regulatory burden and using reliability centered maintenance and condition monitoring; improving maintenance processes through better planning and scheduling, use of information management systems, graduated work controls, and appropriate post-maintenance testing; improving productivity through better teamwork, greater sharing of resources, and better radiation management associated with maintenance; measuring performance of maintenance activities through such tools as performance measures and benchmarking. Figs, tabs

  15. RingSys-Scheduler User`s manual. Information terminal for town monitoring; Brukermanual for RingSys-Scheduler. Informasjonsterminal for byovervaaking

    Energy Technology Data Exchange (ETDEWEB)

    Marsteen, L.

    1996-02-01

    This report is a User`s manual. It describes RingSys Scheduler, a computer system for continuous display of time series, public information and static pictures. The computer is connected to a host machine via modem and time series, and public information are automatically updated once an hour. RingSys-Scheduler is PC based. It is developed using Excel`s macro language as well as the asynchronous communication program Dynacomm`s script language. 12 figs.

  16. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    Science.gov (United States)

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  17. Preventive and corrective maintenance for MINT EPS 3000 electron beam machine

    International Nuclear Information System (INIS)

    Siti Aiasah Hashim; Shaari Jahar

    2005-01-01

    Preventive and corrective maintenance of a high energy electron is to ensure that the machine would not fail during operation. MINT's EPS 3000 electron beam machine has been in operation for almost 12 years. Throughout those years, events relating to scheduled overhauls and unscheduled corrective maintenance had provided invaluable experience in the form of informal maintenance training to the operators. With the implementation of ISO 9001:2000 Quality Management System at the facility, the preventive and corrective maintenance program is becoming more structured and orderly. Collected maintenance data shall be used to initiate continual improvement activities in the facility.This paper describes MINT-ALURTRON's 12 years experience in providing maintenance work for the EPS 3000. (Author)

  18. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  19. A dynamic predictive maintenance policy for complex multi-component systems

    International Nuclear Information System (INIS)

    Van Horenbeek, Adriaan; Pintelon, Liliane

    2013-01-01

    The use of prognostic methods in maintenance in order to predict remaining useful life is receiving more attention over the past years. The use of these techniques in maintenance decision making and optimization in multi-component systems is however a still underexplored area. The objective of this paper is to optimally plan maintenance for a multi-component system based on prognostic/predictive information while considering different component dependencies (i.e. economic, structural and stochastic dependence). Consequently, this paper presents a dynamic predictive maintenance policy for multi-component systems that minimizes the long-term mean maintenance cost per unit time. The proposed maintenance policy is a dynamic method as the maintenance schedule is updated when new information on the degradation and remaining useful life of components becomes available. The performance, regarding the objective of minimal long-term mean cost per unit time, of the developed dynamic predictive maintenance policy is compared to five other conventional maintenance policies, these are: block-based maintenance, age-based maintenance, age-based maintenance with grouping, inspection condition-based maintenance and continuous condition-based maintenance. The ability of the predictive maintenance policy to react to changing component deterioration and dependencies within a multi-component system is quantified and the results show significant cost savings

  20. STARFIRE remote maintenance and reactor facility concept

    International Nuclear Information System (INIS)

    Graumann, D.W.; Field, R.E.; Lutz, G.R.; Trachsel, C.A.

    1981-01-01

    A total remote maintenance facility has been designed for all equipment located within the reactor building and hot cell, although operational flexibility has been provided by design of the reactor shielding such that personnel access into the reactor building within 24 hours after reactor shutdown is possible. The reactor design permits removal and replacement of all components if necessary, however, the vacuum pumps, isolation valves and blanket require scheduled, routine maintenance. Reactor scheduled maintenance does not dominate annual plant downtime, therefore, several scheduled operations can be added without affecting reactor availability. The maintenance facilities consist of the reactor building, the hot cell, the reactor service area and the remote maintenance control room. The reactor building contains the reactor, selected support system modules, and required maintenance equipment. The reactor and the support systems are maintained with (1) equipment that is mounted on a monorail system; (2) overhead cranes; and (3) bridge-mounted electromechanical manipulators. The hot cell is located outside of the reactor building to localize contamination products and permit independent operation. An equipment air lock connects the reactor building to the hot cell

  1. On the Use of Time-Limited Information for Maintenance Decision Support: A Predictive Approach under Maintenance Constraints

    Directory of Open Access Journals (Sweden)

    E. Khoury

    2013-01-01

    Full Text Available This paper deals with a gradually deteriorating system operating under an uncertain environment whose state is only known on a finite rolling horizon. As such, the system is subject to constraints. Maintenance actions can only be planned at imposed times called maintenance opportunities that are available on a limited visibility horizon. This system can, for example, be a commercial vehicle with a monitored critical component that can be maintained only in some specific workshops. Based on the considered system, we aim to use the monitoring data and the time-limited information for maintenance decision support in order to reduce its costs. We propose two predictive maintenance policies based, respectively, on cost and reliability criteria. Classical age-based and condition-based policies are considered as benchmarks. The performance assessment shows the value of the different types of information and the best way to use them in maintenance decision making.

  2. Real-Time Scheduling for Preventing Information Leakage with Preemption Overheads

    Directory of Open Access Journals (Sweden)

    BAEK, H.

    2017-05-01

    Full Text Available Real-time systems (RTS are characterized by tasks executing in a timely manner to meet its deadlines as a real-time constraint. Most studies of RTS have focused on these criteria as primary design points. However, recent increases in security threats to various real-time systems have shown that enhanced security support must be included as an important design point, retro-fitting such support to existing systems as necessary. In this paper, we propose a new pre-flush technique referred to as flush task reservation for FP scheduling (FTR-FP to conditionally sanitize the state of resources shared by real-time tasks by invoking a flush task (FT in order to mitigate information leakage/corruption of real-time systems. FTR-FP extends existing works exploiting FTs to be applicable more general scheduling algorithms and security model. We also propose modifications to existing real-time scheduling algorithms to implement a pre-flush technique as a security constraint, and analysis technique to verify schedulability of the real-time scheduling. For better analytic capability, our analysis technique provides a count of the precise number of preemptions that a task experiences offline. Our evaluation results demonstrate that our proposed schedulability analysis improves the performance of existing scheduling algorithms in terms of schedulability and preemption cost.

  3. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  4. IMPROVING THE QUALITY OF MAINTENANCE PROCESSES USING INFORMATION TECHNOLOGY

    Directory of Open Access Journals (Sweden)

    Zora Arsovski

    2008-06-01

    Full Text Available In essence, process of maintaining equipment is a support process, because it indirectly contributes to operational ability of the production process necessary for the supply chain of the new value. Taking into account increased levels of automatization and quality, this proces s becomes more and more significant and for some branches of industry, even crucial. Due to the fact that the quality of the entire process is more and more dependent on the maintenance process, these processes must be carefully designed and effectively im plemented. There are various techniques and approaches at our disposal, such as technical, logistical and intensive application of the information - communication technologies. This last approach is presented in this work. It begins with organizational goa ls, especially quality objectives. Then, maintenance processes and integrated information system structures are defined. Maintenance process quality and improvement processes are defined using a set of performances, with a special emphasis placed on effectiveness and quality economics. At the end of the work, information system for improving maintenance economics is structured. Besides theoretical analysis, work also presents results authors obtained analyzing food industry, metal processing industry an d building materials industry.

  5. Maintenance of auditory-nonverbal information in working memory.

    Science.gov (United States)

    Soemer, Alexander; Saito, Satoru

    2015-12-01

    According to the multicomponent view of working memory, both auditory-nonverbal information and auditory-verbal information are stored in a phonological code and are maintained by an articulation-based rehearsal mechanism (Baddeley, 2012). Two experiments have been carried out to investigate this hypothesis using sound materials that are difficult to label verbally and difficult to articulate. Participants were required to maintain 2 to 4 sounds differing in timbre over a delay of up to 12 seconds while performing different secondary tasks. While there was no convincing evidence for articulatory rehearsal as a main maintenance mechanism for auditory-nonverbal information, the results suggest that processes similar or identical to auditory imagery might contribute to maintenance. We discuss the implications of these results for multicomponent models of working memory.

  6. On the optimal scheduling of periodic tests and maintenance for reliable redundant components

    International Nuclear Information System (INIS)

    Courtois, Pierre-Jacques; Delsarte, Philippe

    2006-01-01

    Periodically, some m of the n redundant components of a dependable system may have to be taken out of service for inspection, testing or preventive maintenance. The system is then constrained to operate with lower (n-m) redundancy and thus with less reliability during these periods. However, more frequent periodic inspections decrease the probability that a component fail undetected in the time interval between successive inspections. An optimal time schedule of periodic preventive operations arises from these two conflicting factors, balancing the loss of redundancy during inspections against the reliability benefits of more frequent inspections. Considering no other factor than this decreased redundancy at inspection time, this paper demonstrates the existence of an optimal interval between inspections, which maximizes the mean time between system failures. By suitable transformations and variable identifications, an analytic closed form expression of the optimum is obtained for the general (m, n) case. The optimum is shown to be unique within the ranges of parameter values valid in practice; its expression is easy to evaluate and shown to be useful to analyze and understand the influence of these parameters. Inspections are assumed to be perfect, i.e. they cause no component failure by themselves and leave no failure undetected. In this sense, the optimum determines a lowest bound for the system failure rate that can be achieved by a system of n-redundant components, m of which require for inspection or maintenance recurrent periods of unavailability of length t. The model and its general closed form solution are believed to be new . Previous work had computed optimal values for an estimation of a time average of system unavailability, but by numerical procedures only and with different numerical approximations, other objectives and model assumptions (one component only inspected at a time), and taking into account failures caused by testing itself, repair and

  7. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  8. Descriptions of Transit Maintenance Management Information Systems

    Science.gov (United States)

    1984-10-01

    This 289-page report presents an overview of ten maintenance management information systems that are currently operational or near-operational on minicomputers or microcomputers. The systems described address one or more of the following concerns: co...

  9. Data Base Development of Automobile and Light Truck Maintenance : Volume II. Appendix E.

    Science.gov (United States)

    1978-08-01

    The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...

  10. Data Base Development of Automobile and Light Truck Maintenance : Volume III. Appendix F.

    Science.gov (United States)

    1978-08-01

    The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...

  11. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  12. Use of probabilistic risk assessment in maintenance activities at Palo Verde

    International Nuclear Information System (INIS)

    Lindquist, R.C.; Pobst, D.S.

    1993-01-01

    Probabilistic risk assessment (PRA) is an important tool in addressing various maintenance activities. At the Palo Verde nuclear generating station (PVNGS), the PRA has been used in a variety of ways to support a wide and diverse selection of maintenance-related activities. For on-line or at-power maintenance, the PRA was used to evaluate combinations of maintenance activities possible with the 12-week or floating maintenance schedule. The maintenance schedule was evaluated to identify any higher risk, undesirable combinations of equipment outages, such as the sole steam-driven auxiliary feedwater pump and the same train emergency diesel generator. Table I is a sampling of the results from the maintenance schedule evaluation in terms of increase in conditional core damage frequency (CDF) above the base- line value due to maintenance on some important key safety systems and combinations thereof. The baseline CDF is 7.4 x 10 -7 per 72 h

  13. Managing and controlling maintenance

    International Nuclear Information System (INIS)

    Chavez, G.; Perla, H.F.

    1980-01-01

    A well-planned maintenance-management program can bring organized yet flexible scheduling, improved productivity, and a ready-access data bank. The system detailed in the article, developed for a nuclear power plant, has application to any equipment-intensive facility. Key features of the system include: documentation of all work requirements and their completion; automated prioritizing of work orders; automatic generation of work orders for repetitive work, when due; work lists in priority sequence; deferred, standby, and outage work reports; labor and work-order backlog information; equipment work histories and cumulative failure data

  14. Maintenance of non-consciously presented information engages the prefrontal cortex

    Directory of Open Access Journals (Sweden)

    Fredrik eBergström

    2014-11-01

    Full Text Available Conscious processing is generally seen as required for flexible and willful actions, as well as for tasks that require durable information maintenance. Here we present research that questions the assumption that only consciously perceived information is durable (> 500 ms. Using the attentional blink phenomenon, we rendered otherwise relatively clearly perceived letters non-conscious. In a first experiment we systematically manipulated the delay between stimulus presentation and response, for the purpose of estimating the durability of non-conscious perceptual representations. For items reported not seen, we found that behavioral performance was better than chance across intervals up to 15 seconds. In a second experiment we used fMRI to investigate the neural correlates underlying the maintenance of non-conscious perceptual representations. Critically, the relatively long delay period demonstrated in experiment 1 enabled isolation of the signal change specifically related to the maintenance period, separate from stimulus presentation and response. We found sustained BOLD signal change in the right mid-lateral prefrontal cortex, orbitofrontal cortex, and crus II of the cerebellum during maintenance of non-consciously perceived information. These findings are consistent with the controversial claim that working-memory mechanisms are involved in the short-term maintenance of non-conscious perceptual representations.

  15. A COMPUTER BASED MAINTENANCE MANAGEMENT SYSTEM ...

    African Journals Online (AJOL)

    ... programs to schedule for maintenance or replacement of machines has been designed such that it enables the maintenance department control all jobs associated with plant maintenance and breakdown. It predicts the time to failure of designated plants and caters for the replacement analysis of some capital equipment.

  16. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  17. Influence of titration schedule and maintenance dose on the tolerability of adjunctive eslicarbazepine acetate: An integrated analysis of three randomized placebo-controlled trials.

    Science.gov (United States)

    Krauss, Gregory; Biton, Victor; Harvey, Jay H; Elger, Christian; Trinka, Eugen; Soares da Silva, Patrício; Gama, Helena; Cheng, Hailong; Grinnell, Todd; Blum, David

    2018-01-01

    To examine the influence of titration schedule and maintenance dose on the incidence and type of treatment-emergent adverse events (TEAEs) associated with adjunctive eslicarbazepine acetate (ESL). Data from three randomized, double-blind, placebo-controlled trials were analyzed. Patients with refractory partial-onset seizures were randomized to maintenance doses of ESL 400, 800, or 1200mg QD (dosing was initiated at 400 or 800mg QD) or placebo. The incidence of TEAEs was analyzed during the double-blind period (2-week titration phase; 12-week maintenance phase), according to the randomized maintenance dose and the titration schedule. 1447 patients were included in the analysis. During the first week of treatment, 62% of patients taking ESL 800mg QD had ≥1 TEAE, vs 35% of those taking 400mg QD and 32% of the placebo group; dizziness, somnolence, nausea, and headache were numerically more frequent in patients taking ESL 800mg than those taking ESL 400mg QD. During the double-blind period, the incidences of common TEAEs were lower in patients who initiated ESL at 400mg vs 800mg QD. For the 800 and 1200mg QD maintenance doses, rates of TEAEs leading to discontinuation were lower in patients who began treatment with 400mg than in those who began taking ESL 800mg QD. Initiation of ESL at 800mg QD is feasible. However, initiating treatment with ESL 400mg QD for 1 or 2 weeks is recommended, being associated with a lower incidence of TEAEs, and related discontinuations. For some patients, treatment may be initiated at 800mg QD, if the need for more immediate seizure reduction outweighs concerns about increased risk of adverse reactions during initiation. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  18. Risk-based Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Nielsen, Jannie Jessen

    2011-01-01

    For offshore wind turbines, costs to Operation and Maintenance (OM) are substantial, and can be expected to increase when wind farms are placed at deeper water depths and in more harsh environments. Traditional strategies for OM include corrective and preventive (scheduled and condition...... statistics and costs of the different operations. The different OM strategies are described and compared in an illustrative example with focus on which types of information that are needed. Special focus is on comparison between risk-based maintenance strategies and the conventional maintenance planning...... and are often the driving mechanisms for failures / faults that need maintenance. Observations of the degree of damage can increase the reliability of predictions and decrease the costs of OM if integrated in a risk-based framework theoretically based on pre-posterior Bayesian decision theory. The mathematical...

  19. Risk-Informed Decisions Optimization in Inspection and Maintenance

    International Nuclear Information System (INIS)

    Robertas Alzbutas

    2002-01-01

    The Risk-Informed Approach (RIA) used to support decisions related to inspection and maintenance program is considered. The use of risk-informed methods can help focus the adequate in-service inspections and control on the more important locations of complex dynamic systems. The focus is set on the highest risk measured as conditional core damage frequency, which is produced by the frequencies of degradation and final failure at different locations combined with the conditional failure consequence probability. The probabilities of different degradation states per year and consequences are estimated quantitatively. The investigation of inspection and maintenance process is presented as the combination of deterministic and probabilistic analysis based on general risk-informed model, which includes the inspection and maintenance program features. Such RIA allows an optimization of inspection program while maintaining probabilistic and fundamental deterministic safety requirements. The failure statistics analysis is used as well as the evaluation of reliability of inspections. The assumptions regarding the effectiveness of the inspection methods are based on a classification of the accessibility of the welds during the inspection and on the different techniques used for inspection. The probability of defect detection is assumed to depend on the parameters either through logarithmic or logit transformation. As example the modeling of the pipe systems inspection process is analyzed. The means to reduce a number of inspection sites and the cumulative radiation exposure to the NPP inspection personnel with a reduction of overall risk is presented together with used and developed software. The developed software can perform and administrate all the risk evaluations and ensure the possibilities to compare different options and perform sensitivity analysis. The approaches to define an acceptable level of risk are discussed. These approaches with appropriate software in

  20. A VITAL service for predictive MOV maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Motor-operated valve (MOV) maintenance can be a major contributor to unplanned plant downtime, either because valve malfunctions cause unscheduled outages, or because unnecessary valve maintenance lengthens scheduled outages. The cause of both situations is a preventive approach to valve maintenance, where maintenance is scheduled according to a timetable instead of according to a demonstrated need. To move towards a predictive maintenance approach, inexpensive methods of collecting and diagnosing real-time data on the conditions of a valve must be made available. Such a system must be capable of detecting and diagnosing degrading mechanical and electrical behaviour at an early stage, as well as being able to predict the time of failure. Without this data, a predictive approach to maintenance is impossible. Westinghouse is addressing the requirements for a predictive approach to MOV maintenance with the introduction of a third-generation of diagnostic systems for motor-operated valves -the portable Valve Intelligent Test and Analysis System (VITALS) and the on-line Valve Monitoring System (VMS). (author)

  1. Dataset Documentation for the ERTMS-Oriented Signalling Maintenance in the Danish Railway System

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad

    2017-01-01

    This documentation provides information about the dataset generated as part of a PhD thesis (Towards Signalling Maintenance Scheduling Problem for European Railway Traffic Management System ) for the signaling maintenance of the Danish railway system . The data instances (M.Pour 2018a; M.Pour 2018b......) have been created for the purpose of adaptation to the newest railway signalling standard which is so called European Railway Traffic Management System(ERTMS). The chapter provides explanation of the different types of maintenance tasks in the ERTMS, followed by data definition. Furthermore...

  2. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  3. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  4. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  5. Concurrent immunomodulator therapy is associated with higher adalimumab trough levels during scheduled maintenance therapy.

    Science.gov (United States)

    Bond, Ashley; Dodd, Susanna; Fisher, Gareth; Skouras, Thomas; Subramanian, Sreedhar

    2017-02-01

    Combination therapy with infliximab and immunomodulators is superior to monotherapy, resulting in better outcomes and higher trough levels of infliximab. The role of concurrent immunomodulatory therapy on adalimumab trough levels has not been adequately investigated. We evaluated the impact of concomitant immunomodulation on adalimumab trough levels in patients on scheduled maintenance therapy. We conducted a prospective observational, cross-sectional study of all inflammatory bowel disease patients on maintenance therapy who had adalimumab trough levels measured between January 2013 and January 2016. Drug level and anti-drug antibody measurements were performed on sera using a solid phase assay. Pairwise comparison of means was used to compare trough levels in patients with and without concomitant immune modulator therapy. In total, 79 patients were included. Twenty-three patients (29.1%) were on weekly dosing whereas 56 (70.9%) were on alternate weeks. Median adalimumab trough levels were comparable in patients with and without clinical remission (6.8 μg/ml (IQR 5.6-8.1) versus 6.7 μg/ml (IQR 3.9-8.1), respectively. Patients with an elevated faecal calprotectin >250 μg/g had lower adalimumab trough levels (median 6.7, IQR 3.9-8) compared to patients with faecal calprotectin <250 μg/g (median 7.7, IQR 6.1-8.1) though this did not achieve statistical significance (p = .062). Median adalimumab trough levels among patients on concurrent immunomodulators was 7.2 μg/ml (IQR 5.7-8.1) compared to those not on concurrent immunomodulator, 6.1 μg/ml (IQR 2.7-7.7, p = .0297). Adalimumab trough levels were significantly higher in patients on concurrent immunomodulators during maintenance therapy. There was a trend towards a lower adalimumab trough level in patients with elevated calprotectin.

  6. The use of condition monitoring information for maintenance planning and decision-making

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K.; Rosqvist, T. [VTT Industrial Systems (Finland); Paulsen, J.L. [Risoe National Lab., Roskilde (Denmark)

    2002-12-01

    A survey is presented outlining the use of condition monitoring information in three Nordic nuclear power plants. The questions of the survey relate to the role of condition monitoring in strategic, as well as operative, maintenance planning and decision-making. The survey indicates that condition monitoring is increasingly implemented at nuclear power plants, but very selectively and in a rather slow pace for predictive maintenance. A combined strategy of condition based maintenance and predetermined preventive maintenance is applied for important equipment such as main circulation pumps and steam turbines. A realistic aim is to reduce the number of costly or error prone maintenance and disassembling inspection activities by condition monitoring given that the approach enables a good diagnosis and prediction. Systematic follow-up and analysis of such condition monitoring information followed by a case-specific planning and decision making of timely and rightly directed maintenance actions can justify an extension of the intervals of a number of predetermined inspection, maintenance or periodic testing tasks. (au)

  7. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  8. Decreasing inventory of a cement factory roller mill parts using reliability centered maintenance method

    Science.gov (United States)

    Witantyo; Rindiyah, Anita

    2018-03-01

    According to data from maintenance planning and control, it was obtained that highest inventory value is non-routine components. Maintenance components are components which procured based on maintenance activities. The problem happens because there is no synchronization between maintenance activities and the components required. Reliability Centered Maintenance method is used to overcome the problem by reevaluating maintenance activities required components. The case chosen is roller mill system because it has the highest unscheduled downtime record. Components required for each maintenance activities will be determined by its failure distribution, so the number of components needed could be predicted. Moreover, those components will be reclassified from routine component to be non-routine component, so the procurement could be carried out regularly. Based on the conducted analysis, failure happens in almost every maintenance task are classified to become scheduled on condition task, scheduled discard task, schedule restoration task and no schedule maintenance. From 87 used components for maintenance activities are evaluated and there 19 components that experience reclassification from non-routine components to routine components. Then the reliability and need of those components were calculated for one-year operation period. Based on this invention, it is suggested to change all of the components in overhaul activity to increase the reliability of roller mill system. Besides, the inventory system should follow maintenance schedule and the number of required components in maintenance activity so the value of procurement will be decreased and the reliability system will increase.

  9. Present activity in ASME Section XI regarding risk-informed maintenance

    International Nuclear Information System (INIS)

    Hedden, Owen; Chockie, Alan

    2005-01-01

    Since 1996 Section XI of the ASME Boiler and Pressure Vessel Code has actively incorporated risk-informed concepts. The risk-informed process provides a framework for allocating inspection resources in a cost-effective manner and helps focus inspections where most critical for plant safety. Based on the success of the risk-informed ISI piping applications at US and non-US plants, Section XI has refined existing Code Cases and expanded the use of the risk-informed process to a variety of high-risk components and systems. The risk informed approach started in the area of inspection and is now being expanded to other plant maintenance activities. This article summarizes the Section XI actions and the continued development of the risk-informed process to improve nuclear plant maintenance. (author)

  10. Modularity Design Approach for Preventive Machine Maintenance

    Science.gov (United States)

    Ernawati, D.; Pudji, E.; Ngatilah, Y.; Handoyo, R.

    2018-01-01

    In a company, machine maintenance system will be very influential in production process activity. The company should have a scheduled engine maintenance system that does not require high costs when repairing and replacing machine parts. Modularity Design method is able to provide solutions to the engine maintenance scheduling system and can prevent fatal damage to the engine components. It can minimize the cost of repair and replacement of these machine components.The paper provides a solution to machine maintenance problems. The paper is also completed with case study of milling machines. That case studies can give us a real description about impact implementation of modularity design to prevent fatal damage to components and minimize the cost of repair and replacement of components of the machine.

  11. 76 FR 50489 - Agency Information Collection Activities: Harbor Maintenance Fee

    Science.gov (United States)

    2011-08-15

    ... Activities: Harbor Maintenance Fee AGENCY: U.S. Customs and Border Protection, Department of Homeland... Fee (CBP Forms 349 and 350). This is a proposed extension of an information collection that was... Fee. OMB Number: 1651-0055. Form Number: CBP Forms 349 and 350. Abstract: The Harbor Maintenance Fee...

  12. NOMIS: trading information in the trenches

    International Nuclear Information System (INIS)

    Vlajcic, P.

    1984-01-01

    Since the fall of 1977, NUS Corporation has been quietly bringing together nuclear power plant operations and maintenance personnel through a program called NOMIS - the Nuclear Operations and Maintenance Information Service. As the nae indicates, the program is a source of information on the day-to-day operating, maintenance, and technical problems that occur at the plant level. Typical questions that circulate through NOMIS involve problems with specific components or systems, spare-part usage experience, differences in procedures or methods of operation or maintenance, plant staffing structure, data to justify management decisions, responses to inspection and enforcement bulletins or circulars, scheduling recommendations, and person-hour forecasting for specific work

  13. Value centric approaches to the design, operations and maintenance of wind turbines

    Science.gov (United States)

    Khadabadi, Madhur Aravind

    Wind turbine maintenance is emerging as an unexpectedly high component of turbine operating cost, and there is an increasing interest in managing this cost. This thesis presents an alternative view of maintenance as a value-driver, and develops an optimization algorithm to evaluate the value delivered by different maintenance techniques. I view maintenance as an operation that moves the turbine to an improved state in which it can generate more power and, thus, earn more revenue. To implement this approach, I model the stochastic deterioration of the turbine in two dimensions: the deterioration rate, and the extent of deterioration, and then use maintenance to improve the state of the turbine. The value of the turbine is the difference between the revenue from to the power generation and the costs incurred in operation and maintenance. With a focus on blade deterioration, I evaluate the value delivered by implementing two different maintenance schemes, predictive maintenance and scheduled maintenance. An example of predictive maintenance technique is the use of Condition Monitoring Systems to precisely detect deterioration. I model Condition Monitoring System (CMS) of different degrees of fidelity, where a higher fidelity CMS would allow the blade state to be determined with a higher precision. The same model is then applied for the scheduled maintenance technique. The improved state information obtained from these techniques is then used to derive an optimal maintenance strategy. The difference between the value of the turbine with and without the inspection type can be interpreted as the value of the inspection. The results indicate that a higher fidelity (and more expensive) inspection method does not necessarily yield the highest value, and, that there is an optimal level of fidelity that results in maximum value. The results also aim to inform the operator of the impact of regional parameters such as wind speed, variance and maintenance costs to the optimal

  14. Generation maintenance scheduling based on multiple ob jectives and their relationship analysis

    Institute of Scientific and Technical Information of China (English)

    Jun-peng ZHAN; Chuang-xin GUO; Qing-hua WU; Lu-liang ZHANG; Hong-jun FU

    2014-01-01

    In a market environment of power systems, each producer pursues its maximal profit while the independent system operator is in charge of the system reliability and the minimization of the total generation cost when generating the generation maintenance scheduling (GMS). Thus, the GMS is inherently a multi-objective optimization problem as its objectives usually conflict with each other. This paper proposes a multi-objective GMS model in a market environment which includes three types of objectives, i.e., each producer’s profit, the system reliability, and the total generation cost. The GMS model has been solved by the group search optimizer with multiple producers (GSOMP) on two test systems. The simulation results show that the model is well solved by the GSOMP with a set of evenly distributed Pareto-optimal solutions obtained. The simulation results also illustrate that one producer’s profit conflicts with another one’s, that the total generation cost does not conflict with the profit of the producer possessing the cheapest units while the total generation cost conflicts with the other producers’ profits, and that the reliability objective conflicts with the other objectives.

  15. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  16. Random maintenance policies

    CERN Document Server

    Nakagawa, Toshio

    2014-01-01

    Exploring random maintenance models, this book provides an introduction to the implementation of random maintenance, and it is one of the first books to be written on this subject.  It aims to help readers learn new techniques for applying random policies to actual reliability models, and it provides new theoretical analyses of various models including classical replacement, preventive maintenance and inspection policies. These policies are applied to scheduling problems, backup policies of database systems, maintenance policies of cumulative damage models, and reliability of random redundant systems. Reliability theory is a major concern for engineers and managers, and in light of Japan’s recent earthquake, the reliability of large-scale systems has increased in importance. This also highlights the need for a new notion of maintenance and reliability theory, and how this can practically be applied to systems. Providing an essential guide for engineers and managers specializing in reliability maintenance a...

  17. Optimizing stormwater treatment practices a handbook of assessment and maintenance

    CERN Document Server

    Erickson, Andrew J; Gulliver, John S

    2013-01-01

    Optimizing Stormwater Treatment Practices: A Handbook of Assessment and Maintenance provides the information necessary for developing and operating an effective maintenance program for stormwater treatment. The book offers instructions on how to measure the level of performance of stormwater treatment practices directly and bases proposed maintenance schedules on actual performance and historical maintenance efforts and costs. The inspection methods, which are proven in the field and have been implemented successfully, are necessary as regulatory agencies are demanding evaluations of the performance of stormwater treatment practices. The authors have developed a three-tiered approach that offers readers a standard protocol for how to determine the effectiveness of stormwater treatment practices currently in place. This book also: Provides a standard protocol for how to determine the effectiveness of stormwater treatment practices Assists readers with identifying which assessment techniques to use for stormwa...

  18. Towards Signalling Maintenance Scheduling for European Railway Traffic Management System

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad

    signalling system. Therefore, the entire maintenance system needs to change from the previous system to the newest system, and hence, new optimisation techniques need to be established so as to facilitate managers in creating ideal maintenance strategies. The aim of this thesis is to develop new maintenance......The European Railway Traffic Management System (ERTMS) is the newest signalling standard that has been introduced in the railway industry. The aim of ERTMS is to ensure better signalling communication amongst various train systems, and hence, to help in attaining improved connectivity and commuting...... between European countries. In various countries across the world, there is a gradual shift from the current signalling systems to ERTMS. Amongst the European countries, Denmark was the first country to commence a full upgrading of its signalling system to ERTMS. A variety of maintenance requirements...

  19. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  20. A condition-based maintenance policy for stochastically deteriorating systems

    International Nuclear Information System (INIS)

    Grall, A.; Berenguer, C.; Dieulle, L.

    2002-01-01

    We focus on the analytical modeling of a condition-based inspection/replacement policy for a stochastically and continuously deteriorating single-unit system. We consider both the replacement threshold and the inspection schedule as decision variables for this maintenance problem and we propose to implement the maintenance policy using a multi-level control-limit rule. In order to assess the performance of the proposed maintenance policy and to minimize the long run expected maintenance cost per unit time, a mathematical model for the maintained system cost is derived, supported by the existence of a stationary law for the maintained system state. Numerical experiments illustrate the performance of the proposed policy and confirm that the maintenance cost rate on an infinite horizon can be minimized by a joint optimization of the maintenance structure thresholds, or equivalently by a joint optimization of a system replacement threshold and the aperiodic inspection schedule

  1. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  2. design of preventive maintenance scheduling model for ...

    African Journals Online (AJOL)

    connected in parallel, Rj(ti) is the reliability of the jth unit at ith time interval, n is the to- tal number of systems (components or units) connected in parallel. Equations (3) and (4) enable us to deter- mine the reliability of all components, units or sub-systems in an industry. 5. System Reliability with Preventive. Maintenance. Fig.

  3. A review of planning models for maintenance and production.

    NARCIS (Netherlands)

    G. Budai-Balke (Gabriella); R. Dekker (Rommert); R.P. Nicolai (Robin)

    2006-01-01

    textabstractIn this article we give an overview of the relation between planning of maintenance and production. On the one hand we consider production planning and scheduling models in which failures and maintenance aspects are taken into account. Next we discuss the planning of maintenance

  4. Using risk-informed asset management for feedwater system preventative maintenance optimization

    International Nuclear Information System (INIS)

    Kee, Ernest; Sun, Alice; Richards, Andrew; Grantom, Rick; Liming, James; Salter, James

    2004-01-01

    The initial development of a South Texas Project Nuclear Operating Company process for supporting preventative maintenance optimization by applying the Balance-Of-Plant model and Risk-Informed Asset Management alpha-level software applications is presented. Preventative maintenance activities are evaluated in the South Texas Project Risk-Informed Asset Management software while the plant maintains or improves upon high levels of nuclear safety. In the Balance-Of-Plant availability application, the level of detail in the feedwater system is enhanced to support plant decision-making at the component failure mode and human error mode level of indenture by elaborating on the current model at the super-component level of indenture. The enhanced model and modeling techniques are presented. Results of case studies in feedwater system preventative maintenance optimization sing plant-specific data are also presented. (author)

  5. Optimal infrastructure maintenance scheduling problem under budget uncertainty.

    Science.gov (United States)

    2010-05-01

    This research addresses a general class of infrastructure asset management problems. Infrastructure : agencies usually face budget uncertainties that will eventually lead to suboptimal planning if : maintenance decisions are made without taking the u...

  6. Fault Sample Generation for Virtual Testability Demonstration Test Subject to Minimal Maintenance and Scheduled Replacement

    Directory of Open Access Journals (Sweden)

    Yong Zhang

    2015-01-01

    Full Text Available Virtual testability demonstration test brings new requirements to the fault sample generation. First, fault occurrence process is described by stochastic process theory. It is discussed that fault occurrence process subject to minimal repair is nonhomogeneous Poisson process (NHPP. Second, the interarrival time distribution function of the next fault event is proposed and three typical kinds of parameterized NHPP are discussed. Third, the procedure of fault sample generation is put forward with the assumptions of minimal maintenance and scheduled replacement. The fault modes and their occurrence time subject to specified conditions and time period can be obtained. Finally, an antenna driving subsystem in automatic pointing and tracking platform is taken as a case to illustrate the proposed method. Results indicate that both the size and structure of the fault samples generated by the proposed method are reasonable and effective. The proposed method can be applied to virtual testability demonstration test well.

  7. A solution approach based on Benders decomposition for the preventive maintenance scheduling problem of a stochastic large-scale energy system

    DEFF Research Database (Denmark)

    Lusby, Richard Martin; Muller, Laurent Flindt; Petersen, Bjørn

    2013-01-01

    This paper describes a Benders decomposition-based framework for solving the large scale energy management problem that was posed for the ROADEF 2010 challenge. The problem was taken from the power industry and entailed scheduling the outage dates for a set of nuclear power plants, which need...... to be regularly taken down for refueling and maintenance, in such away that the expected cost of meeting the power demand in a number of potential scenarios is minimized. We show that the problem structure naturally lends itself to Benders decomposition; however, not all constraints can be included in the mixed...

  8. Operations Research Models for Scheduling Railway Infrastructure Maintenance

    NARCIS (Netherlands)

    G. Budai-Balke (Gabriella)

    2009-01-01

    textabstractIn the last decades, maintenance of technical systems has become increasingly impor- tant in many industries. Such systems are transport systems (rail, bus, airplane), civil engineering systems (roads, buildings, bridges), health care (hospitals), communication systems, manufacturing

  9. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  10. Dynamic optimization of maintenance and improvement planning for water main system: Periodic replacement approach

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Woo; Choi, Go Bong; Lee, Jong Min [Seoul National University, Seoul (Korea, Republic of); Suh, Jung Chul [Samchully Corporation, Seoul (Korea, Republic of)

    2016-01-15

    This paper proposes a Markov decision process (MDP) based approach to derive an optimal schedule of maintenance, rehabilitation and replacement of the water main system. The scheduling problem utilizes auxiliary information of a pipe such as the current state, cost, and deterioration model. The objective function and detailed algorithm of dynamic programming are modified to solve the periodic replacement problem. The optimal policy evaluated by the proposed algorithm is compared to several existing policies via Monte Carlo simulations. The proposed decision framework provides a systematic way to obtain an optimal policy.

  11. 76 FR 78950 - FBI Criminal Justice Information Services Division; Revised User Fee Schedule

    Science.gov (United States)

    2011-12-20

    ... amounts for volunteers, as explained at 75 FR 18752, and Centralized Billing Service Providers (CBSPs), as... Information Services Division; Revised User Fee Schedule AGENCY: Federal Bureau of Investigation (FBI.... Enourato, Section Chief, Resources Management Section, Criminal Justice Information Services Division, FBI...

  12. Flexible Software Solution for Information System of Maintenance and Repair in Armenian NPP Medzamor

    International Nuclear Information System (INIS)

    Stoilova Yordanova, V.; Manchev, B.

    2016-01-01

    Achieving high performance in maintenance and repair activities in nuclear facilities and good results in this area is not possible without proper planning. This includes long-term, medium-term and annual planning. A computerized information maintenance management system is a tool widely used by nuclear operators to achieve safe, reliable, stable and predictable plant operation. Development and implementation of such a system in the Armenian NPP Medzamor (ANPP) was initiated by the European Commission (EC) in August 2013 based on the decision of ANPP management to improve practice in terms of planning and carrying out maintenance and repair of plant structures, systems and components (SSCs). The main purpose for the development and deployment of information maintenance management system in ANPP is creation of a systematic approach to the distribution of tasks between the maintenance personnel as well as the timing and methods of their implementation - on which systems, structures and components, maintenance frequency, while the ultimate goal is to optimize the use of resources for maintenance and to ensure plant safe operation and reliability. In November 2013 a contract between European Commission and consortium Risk Engineering -David Holding was signed, including the following supplies: Hardware for the information system of ANPP (called us Archimed MRO); Specification, design and development of the software of Archimed MRO, installation of the system, data migration, training of ANPP staff operating the system, and 9 months trial operation. In the process of specifying the functionality of the system the main purpose was to provide modern information tools to help improve the work of ANPP personnel in the following areas: Optimization of ANPP maintenance program; Planning of maintenance, repair and overhaul (MRO) activities; Effective management of the processes of MRO; Analysis of the MRO results (trend analysis, recurrence of repairs, quality of the repairs

  13. Criteria and model for assessing and improving information technology maturity within maintenance

    International Nuclear Information System (INIS)

    Kans, M; Ehsanifard, K; Moniri, A

    2012-01-01

    Maintenance optimization and decision-making processes have been both influenced considerably by Information Technology (IT) developments mainly by increasing data availability. The decision-making process in its turn has affected systems trustworthiness positively. Therefore, theoretically speaking it could be said that Maintenance Management Information technology (MMIT) has the potential to provide applicable solutions for many of the maintenance management problems. Nevertheless, this potential has been hardly experienced in practice because of the mismatch between the level of IT maturity in the organizations and their selected MMIT solutions. To fill this gap this paper suggests a number of criteria which are crucial in decision making for selecting a MMIT application. The criteria are formed based on previous findings utilising an extensive literature review. A model is further developed for this purpose which is also tested on a case company active in power generation in Sweden. The model proved to be helpful when taking further improvement steps for reaching high utilization of IT in maintenance.

  14. Optimization of maintenance scheduling with genetic algorithms regarding the storage behavior during the availability prognosis of power plants; Optimierung der Instandhaltungsplanung mit genetischen Algorithmen unter Beruecksichtigung des Speicherverhaltens bei der Verfuegbarkeitsprognose von Kraftwerksanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Warnecke, Martin

    2008-12-19

    In the age of the liberalized energy market the power plant raisers and operators have to consider several factors when choosing the fuel type and dimensioning their power plants, e.g. emissions, erection cost and last but not least operating cost. Simulations assuming different scenarios are required. The rivaling aspects of erection cost, partially dependant availability, maintenance philosophy and operating cost are motivating the optimization of maintenance scheduling and the availability prognosis which are the topic of this thesis. The focus of this thesis is on the scheduling of the time based maintenance strategy. This strategy defines the time spans between the repeating inspections of each component. This is based on the experience of operators and manufacturers. The mathematic problem itself is especially challenging because of strong interdependencies between the single components due to synergy effects. Each component has its own theoretically optimal lifetime and maintenance period. Yet as part of a compound it might be more cost efficient in the long run to maintain some components together shifting some of them forward or backward. The thereby caused interdependencies constitute a non-linear, mixed-whole-numbered calculation of the cost approximation. For the optimization of this maintenance scheduling a new approach was developed. It was realized that the problem couldn't be solved satisfyingly with classic optimization algorithms. Afterwards a solution based on ''genetic algorithms'' was developed. In the meantime the methods for the availability prognosis of complex power plant facilities were enhanced. Especially a new component with storage behavior (with optional losses) was added to the prognosis tool. This storage model integrates the behavior of a storage into the computing time reduced Monte-Carlo-Method. (orig.)

  15. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    International Nuclear Information System (INIS)

    Heinemann, J.L.; Millard, G.E.

    1997-08-01

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP

  16. Maintenance information management using access/visual basic

    International Nuclear Information System (INIS)

    Memory A, Michael; Cumbia W, Brad

    1998-01-01

    The Accelerator Electronic Support Group (AES) is the group responsible for maintaining over 100 subsystems of the Nuclear Physics Accelerator at Jefferson Lab. Presently, there are 30 employees in the AES group. It is each individual's responsibility to make entries into the AES Database. This Access/Visual Basic based database is the center for all work performed to the Accelerator by the AES group. At any time, an AES technologist can supply valuable information needed to track pending maintenance, data analysis of recurring problems, inventory tracking and the ability to export all of this information to a web based electronic log generated by Jefferson Lab Operations Group

  17. A computerized event and maintenance data system at Loviisa nuclear power plant

    International Nuclear Information System (INIS)

    Jankala, K.E.; Saarelainen, P.; Vaurio, J.K.

    1993-01-01

    An on-line failure and maintenance event data system (which is a part of the Loviisa power plant information system) is described as developed and implemented at the Loviisa power plant. The system has been in operation since 1989, and the data base now covers more than 10 years of operation. The system contains a complete unavailability history, i.e. failures, repairs, replacements, scheduled or unscheduled preventive maintenance and periodic testing or service actions for any component that is relevant to plant safety, risk or economic production. The data base provides useful feedback from operating experience and can support e.g. studies on optimal maintenance and testing, planning of spare parts inventory and repair resources, updating of reliability parameters for risk studies, etc. (Z.S.) 4 refs

  18. A production model and maintenance planning model for the process industry

    NARCIS (Netherlands)

    Ashayeri, J.; Teelen, A.; Selen, W.J.

    1995-01-01

    In this paper a model is developed to simultaneously plan preventive maintenance and production in a process industry environment, where maintenance planning is extremely important. The model schedules production jobs and preventive maintenance jobs, while minimizing costs associated with

  19. Cost Minimization for Joint Energy Management and Production Scheduling Using Particle Swarm Optimization

    Science.gov (United States)

    Shah, Rahul H.

    Production costs account for the largest share of the overall cost of manufacturing facilities. With the U.S. industrial sector becoming more and more competitive, manufacturers are looking for more cost and resource efficient working practices. Operations management and production planning have shown their capability to dramatically reduce manufacturing costs and increase system robustness. When implementing operations related decision making and planning, two fields that have shown to be most effective are maintenance and energy. Unfortunately, the current research that integrates both is limited. Additionally, these studies fail to consider parameter domains and optimization on joint energy and maintenance driven production planning. Accordingly, production planning methodology that considers maintenance and energy is investigated. Two models are presented to achieve well-rounded operating strategy. The first is a joint energy and maintenance production scheduling model. The second is a cost per part model considering maintenance, energy, and production. The proposed methodology will involve a Time-of-Use electricity demand response program, buffer and holding capacity, station reliability, production rate, station rated power, and more. In practice, the scheduling problem can be used to determine a joint energy, maintenance, and production schedule. Meanwhile, the cost per part model can be used to: (1) test the sensitivity of the obtained optimal production schedule and its corresponding savings by varying key production system parameters; and (2) to determine optimal system parameter combinations when using the joint energy, maintenance, and production planning model. Additionally, a factor analysis on the system parameters is conducted and the corresponding performance of the production schedule under variable parameter conditions, is evaluated. Also, parameter optimization guidelines that incorporate maintenance and energy parameter decision making in the

  20. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    a small team of experienced nuclear experts/specialists in the world. It can be requested for a single area or multiple ones, such as a) In-Service Inspection program review and optimization, including inspection qualification and risk informed inspection, b) maintenance program optimization by means of equipment reliability, performance based approach, risk informed on-line maintenance, condition based maintenance, c) outage improvement be means of streamlined integration of technologies and process, work planning and scheduling, plant modifications and configuration control, indicators and operating experience feedback system, safety culture, outsourcing and contract management, and spare parts

  1. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  2. Excellence through outage planning and scheduling

    International Nuclear Information System (INIS)

    Ferriole, G.

    1987-01-01

    The Nuclear and Fossil Generation Division of Electricite de France (EdF) has been the largest nuclear plant operating utility in France since 1984. The size of the units, their standardization, and extensive operating experience were favorable parameters leading to the development of a very complete maintenance organization. Electricite de France believes in the importance of well-defined maintenance concepts. These maintenance concepts contribute to outage performance by requiring a careful consideration of work to be done and by defining the techniques and means of accomplishing this work. In addition to maintenance concepts and careful planning and scheduling, good outage management is achieved through the motivation and dedication of the people involved. It is the key to good operational results

  3. Historical maintenance relevant information road-map for a self-learning maintenance prediction procedural approach

    Science.gov (United States)

    Morales, Francisco J.; Reyes, Antonio; Cáceres, Noelia; Romero, Luis M.; Benitez, Francisco G.; Morgado, Joao; Duarte, Emanuel; Martins, Teresa

    2017-09-01

    A large percentage of transport infrastructures are composed of linear assets, such as roads and rail tracks. The large social and economic relevance of these constructions force the stakeholders to ensure a prolonged health/durability. Even though, inevitable malfunctioning, breaking down, and out-of-service periods arise randomly during the life cycle of the infrastructure. Predictive maintenance techniques tend to diminish the appearance of unpredicted failures and the execution of needed corrective interventions, envisaging the adequate interventions to be conducted before failures show up. This communication presents: i) A procedural approach, to be conducted, in order to collect the relevant information regarding the evolving state condition of the assets involved in all maintenance interventions; this reported and stored information constitutes a rich historical data base to train Machine Learning algorithms in order to generate reliable predictions of the interventions to be carried out in further time scenarios. ii) A schematic flow chart of the automatic learning procedure. iii) Self-learning rules from automatic learning from false positive/negatives. The description, testing, automatic learning approach and the outcomes of a pilot case are presented; finally some conclusions are outlined regarding the methodology proposed for improving the self-learning predictive capability.

  4. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  5. Development of a knowledge-based information management system for plant maintenance

    International Nuclear Information System (INIS)

    Yim, Hyung Sang; Park, Young Jae; Lee, Sang Min; Choi, Jae Boong; Kim, Young Jin; Roh, Eun Chul; Lee, Byung Ine

    2003-01-01

    Recently, the importance of Plant Maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as Risk-Based Inspection(RBI), Fitness For Service guidelines(FFS), Plant Lifecycle Management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system, which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance

  6. Development of a knowledge-based information management system for plant maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Hyung Sang; Park, Young Jae; Lee, Sang Min; Choi, Jae Boong; Kim, Young Jin [Sungkyunkwan Univ., Seoul (Korea, Republic of); Roh, Eun Chul; Lee, Byung Ine [Pohang Iron and Steel Company, Pohang (Korea, Republic of)

    2003-07-01

    Recently, the importance of Plant Maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as Risk-Based Inspection(RBI), Fitness For Service guidelines(FFS), Plant Lifecycle Management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system, which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance.

  7. Development of blanket remote maintenance system

    International Nuclear Information System (INIS)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou

    1998-01-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  8. Development of blanket remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  9. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  10. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, providing maintenance facilities and equipment, procuring stores and spare parts, selecting and training maintenance personnel, reviewing and controlling plant modifications arising from maintenance, and for generating, collecting and retaining maintenance records. Maintenance shall be subject to quality assurance in all aspects important to safety. Because quality assurance has been dealt with in detail in other Safety Guides, it is only included here in specific instances where emphasis is required. Maintenance is considered to include functional and performance testing of plant, surveillance and in-service inspection, where these are necessary either to support other maintenance activities or to ensure continuing capability of structures, systems and components important to safety to perform their intended functions

  11. Maintenance of item and order information in verbal working memory.

    Science.gov (United States)

    Camos, Valérie; Lagner, Prune; Loaiza, Vanessa M

    2017-09-01

    Although verbal recall of item and order information is well-researched in short-term memory paradigms, there is relatively little research concerning item and order recall from working memory. The following study examined whether manipulating the opportunity for attentional refreshing and articulatory rehearsal in a complex span task differently affected the recall of item- and order-specific information of the memoranda. Five experiments varied the opportunity for articulatory rehearsal and attentional refreshing in a complex span task, but the type of recall was manipulated between experiments (item and order, order only, and item only recall). The results showed that impairing attentional refreshing and articulatory rehearsal similarly affected recall regardless of whether the scoring procedure (Experiments 1 and 4) or recall requirements (Experiments 2, 3, and 5) reflected item- or order-specific recall. This implies that both mechanisms sustain the maintenance of item and order information, and suggests that the common cumulative functioning of these two mechanisms to maintain items could be at the root of order maintenance.

  12. Web-Based Requesting and Scheduling Use of Facilities

    Science.gov (United States)

    Yeager, Carolyn M.

    2010-01-01

    Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.

  13. Practical considerations in developing an instrument-maintenance plan--

    International Nuclear Information System (INIS)

    Guth, M.A.S.

    1989-01-01

    The author develops a general set of considerations to explain how a consistent, well-organized, prioritized, and adequate time-allowance program plan for routine maintenance can be constructed. The analysis is supplemented with experience from the high flux isotope reactor (HFIR) at US Oak Ridge National Laboratory (ORNL). After the preventive maintenance (PM) problem was defined, the instruments on the schedule were selected based on the manufacturer's design specifications, quality-assurance requirements, prior classifications, experiences with the incidence of breakdowns or calibration, and dependencies among instruments. The effects of repair error in PM should be also studied. The HFIR requires three full-time technicians to perform both PM and unscheduled maintenance. A review is presented of concepts from queuing theory to determine anticipated breakdown patterns. In practice, the pneumatic instruments have a much longer lifetime than the electric/electronic instruments on various reactors at ORNL. Some special considerations and risk aversion in choosing a maintenance schedule

  14. "Business Continuity and Information Security Maintenance" Masters’ Training Program

    OpenAIRE

    Miloslavskaya , Natalia; Senatorov , Mikhail; Tolstoy , Alexandr; Zapechnikov , Sergei

    2013-01-01

    Part 1: WISE 8; International audience; The experience of preparing for the "Business Continuity and Information Security Maintenance" (BC&ISM) Masters’ program implementation and realization at the "Information Security of Banking Systems" Department of the National Research Nuclear University MEPhI (NRNU MEPhI, Moscow, Russia) is presented. Justification of the educational direction choice for BC&ISM professionals is given. The model of IS Master being trained on this program is described. ...

  15. Maintenance of relational information in working memory leads to suppression of the sensory cortex.

    Science.gov (United States)

    Ikkai, Akiko; Blacker, Kara J; Lakshmanan, Balaji M; Ewen, Joshua B; Courtney, Susan M

    2014-10-15

    Working memory (WM) for sensory-based information about individual objects and their locations appears to involve interactions between lateral prefrontal and sensory cortexes. The mechanisms and representations for maintenance of more abstract, nonsensory information in WM are unknown, particularly whether such actively maintained information can become independent of the sensory information from which it was derived. Previous studies of WM for individual visual items found increased electroencephalogram (EEG) alpha (8-13 Hz) power over posterior electrode sites, which appears to correspond to the suppression of cortical areas that represent irrelevant sensory information. Here, we recorded EEG while participants performed a visual WM task that involved maintaining either concrete spatial coordinates or abstract relational information. Maintenance of relational information resulted in higher alpha power in posterior electrodes. Furthermore, lateralization of alpha power due to a covert shift of attention to one visual hemifield was marginally weaker during storage of relational information than during storage of concrete information. These results suggest that abstract relational information is maintained in WM differently from concrete, sensory representations and that during maintenance of abstract information, posterior sensory regions become task irrelevant and are thus suppressed. Copyright © 2014 the American Physiological Society.

  16. Two Maintenance Mechanisms of Verbal Information in Working Memory

    Science.gov (United States)

    Camos, V.; Lagner, P.; Barrouillet, P.

    2009-01-01

    The present study evaluated the interplay between two mechanisms of maintenance of verbal information in working memory, namely articulatory rehearsal as described in Baddeley's model, and attentional refreshing as postulated in Barrouillet and Camos's Time-Based Resource-Sharing (TBRS) model. In four experiments using complex span paradigm, we…

  17. Utilization of information and communications technology (ICT) to improve workface efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Haines, A.; Rasmussen, J. [Industrial Audit Corp., Toronto, Ontario (Canada)

    2010-07-01

    Improving the efficiency of personnel at the workface is a key objective for executing construction, maintenance, quality, engineering and human performance activities. Schedule and cost overruns have a significant impact on the bottom line and on future business efficiency in execution of tasks is paramount to success. Leveraging information and communications technology (ICT) in construction, maintenance and operation environments can create a mobile workforce where personnel efficiency is improved, significant gains are made on schedule and cost, and the overall quality of work is raised. This paper will discuss the impact of mobile technology specifically on workface efficiency and productivity. (author)

  18. Utilization of information and communications technology (ICT) to improve workface efficiency

    International Nuclear Information System (INIS)

    Haines, A.; Rasmussen, J.

    2010-01-01

    Improving the efficiency of personnel at the workface is a key objective for executing construction, maintenance, quality, engineering and human performance activities. Schedule and cost overruns have a significant impact on the bottom line and on future business efficiency in execution of tasks is paramount to success. Leveraging information and communications technology (ICT) in construction, maintenance and operation environments can create a mobile workforce where personnel efficiency is improved, significant gains are made on schedule and cost, and the overall quality of work is raised. This paper will discuss the impact of mobile technology specifically on workface efficiency and productivity. (author)

  19. A predictive maintenance approach for improved nuclear plant availability

    International Nuclear Information System (INIS)

    Verma, R.M.P.; Pandya, M.B.; Kini, M.P.

    1979-01-01

    Predictive maintenance programme as against preventive maintenance programme aims at diagnosing, inspecting, monitoring, and objective condition-checking of equipment. It helps in forecasting failures, and scheduling the optimal frequencies for overhauls, replacements, lubrication etc. It also helps in establishing work load, manpower, resource planning and inventory control. Various stages of predictive maintenance programme for a nuclear power plant are outlined. A partial list of instruments for predictive maintenance is given. (M.G.B.)

  20. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  1. Maintenance program, organization and procedures

    International Nuclear Information System (INIS)

    Schegk, J.R.R.

    1986-01-01

    The Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) operates two pressurized water reactors (PWR) with 1.200 MW and 1.300 MW and two boiling water reactors (BWR) with an electrical output of 1.300 MW each. The PWR were commissioned in 1975 and 1977 respectively and have so far achieved a cumulative availability of 72%. The BWR started operating in 1984 and 1985. Since than they have been generating with a cumulative availability of 88%. The reliability of the nuclear power stations resulted in a trouble-free operation. For the last two years, the unscheduled non-availability amounted to 3,7% and 6,5% for the PWR and the BWR respectively. These favourable operating results derive inter alia from systematic preventive maintenance and consistent outage management. Apart from the personnel structure in the power stations the functional sequence of planning, control, performance as well as evaluation of maintenance results constitute a closed cycle. In order to ensure and support an effective cooperation of the above mentioned four functional sequences of a cycle, uniform and computer-assisted information and planning aids have been introduced such as task lists, job ordering, time scheduling and materials management. As a result of this preventive maintenance system the average refueling outage period is 35 to 42 days. (orig.)

  2. Risk-informed optimisation of railway tracks inspection and maintenance procedures

    International Nuclear Information System (INIS)

    Podofillini, Luca; Zio, Enrico; Vatn, Jorn

    2006-01-01

    Nowadays, efforts are being made by the railway industry for the application of reliability-based and risk-informed approaches to maintenance optimisation of railway infrastructures, with the aim of reducing the operation and maintenance expenditures while still assuring high safety standards. In particular, in this paper, we address the use of ultrasonic inspection cars and develop a methodology for the determination of an optimal strategy for their use. A model is developed to calculate the risks and costs associated with an inspection strategy, giving credit to the realistic issues of the rail failure process and including the actual inspection and maintenance procedures followed by the railway company. A multi-objective optimisation viewpoint is adopted in an effort to optimise inspection and maintenance procedures with respect to both economical and safety-related aspects. More precisely, the objective functions here considered are such to drive the search towards solutions characterized by low expenditures and low derailment probability. The optimisation is performed by means of a genetic algorithm. The work has been carried out within a study of the Norwegian National Rail Administration (Jernbaneverket)

  3. Diagnostics of heavy mining equipment during the scheduled preventive maintenance

    Science.gov (United States)

    Drygin, M. Yu; Kuryshkin, N. P.

    2018-01-01

    Intensification of production, economic globalization and dramatic downgrade of the workers’ professional skills lead to unacceptable technical state of heavy mining equipment. Equipment maintenance outage reaches 84 % of the total downtime, of which emergency maintenance takes up to 36 % of time, that excesses 429 hours per year fr one excavator. It is shown that yearly diagnostics using methods of non-destructive check allows to reduce emergency downtime by 47 %, and 55 % of revealed defects can be eliminated without breaking the technological cycle of the equipment.

  4. Total productive maintenance on example of automated foundry lines

    Directory of Open Access Journals (Sweden)

    S. Kukla

    2009-07-01

    Full Text Available Within framework of the presented study one has performed analysis of stoppages in automatic foundry lines operation, and basing on assumptions from complex maintenance system has undertaken himself to develop a service maintenance schedule for machinery installed in the line. Moreover, one has presented general assumptions of TPM system operated in conditions of series and multi-series production of cast iron castings. One has constructed operational database and has elaborated a list of line stoppage causes within a year. One has proposed a possibility of implementation of manufacturing systems modeling and simulating technique in management of production machinery operation in a foundry shop. Within framework of the simulation experiment one has developed schedules of production, schedules of maintenance and has forecasted indices of general productivity of the machinery for a various scenarios of events on example of casting line having in-series structure of operational reliability. In course of the study there was implemented ARENA universal software package to modeling and simulation of the manufacturing systems.

  5. A framework to practical predictive maintenance modeling for multi-state systems

    International Nuclear Information System (INIS)

    Cher Ming Tan; Raghavan, Nagarajan

    2008-01-01

    A simple practical framework for predictive maintenance (PdM)-based scheduling of multi-state systems (MSS) is developed. The maintenance schedules are derived from a system-perspective using the failure times of the overall system as estimated from its performance degradation trends. The system analyzed in this work is a flow transmission water pipe system. The various factors influencing PdM-based scheduling are identified and their impact on the system reliability and performance are quantitatively studied. The estimated times to replacement of the MSS may also be derived from the developed model. The results of the model simulation demonstrate the significant impact of maintenance quality and the criteria for the call for maintenance (user demand) on the system reliability and mean performance characteristics. A slight improvement in maintenance quality is found to postpone the system replacement time by manifold. The consistency in the quality of maintenance work with minimal variance is also identified as a very important factor that enhances the system's future operational and downtime event predictability. The studies also reveal that in order to reduce the frequency of maintenance actions, it is necessary to lower the minimum user demand from the system if possible, ensuring at the same time that the system still performs its intended function effectively. The model proposed can be utilized to implement a PdM program in the industry with a few modifications to suit the individual industrial systems' needs

  6. Management Tools for Bus Maintenance: Current Practices and New Methods. Final Report.

    Science.gov (United States)

    Foerster, James; And Others

    Management of bus fleet maintenance requires systematic recordkeeping, management reporting, and work scheduling procedures. Tools for controlling and monitoring routine maintenance activities are in common use. These include defect and fluid consumption reports, work order systems, historical maintenance records, and performance and cost…

  7. Evaluations of maintenance effectiveness on unavailability and risk

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1993-01-01

    A methodology is presented for quantifying the effectiveness of maintenance on unavailability and on risk. The methodology is based on standard Markov modeling principles. What is new is the application to quantify maintenance effectiveness by explicitly quantifying maintenance benefits as well as maintenance's negative contributions. Maintenance effects are quantified by defining a degraded state for the component in addition to an operational state and a failed state which are usually defined. The maintenance model which is developed is a natural extension of the standard models used in reliability analysis and in Probabilistic Risk Assessments (PRAs). The results which are obtained can be directly used in PRAs. Applications of the methodology are presented by quantifying maintenance effectiveness on component performance and component unavailability for specific maintenance schedules

  8. Planning of maintenance of electrical equipment in nuclear plants/laboratories [Paper No.: VB-3

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Bhattacharyya, A.K.

    1981-01-01

    Satisfactory operating performance of electrical systems ensures continuous availability of power to the various plants and machinery in nuclear plant and laboratories. For effective optimal functioning of the electrical equipment and to reduce their down time, scheduled planning of maintenance to the equipment is essential. Maintenance of power plant, nuclear or fossil, and industrial plant and research laboratories demands essential ingredients such as right type of trained and motivated technical personnel, adoption of standard procedures for maintenance, adequate safety and protection for equipment, safety procedures adopted in the installation to prevent hazards to the workers, provision of adequate stores and inventories, facilities for quick repairs and testing of equipment and effective planning of procedures for their maintenance. While breakdown maintenance allows equipment to operate before it is repaired or replaced, preventive maintenance makes use of scheduled inspection and periodical equipment overhaul and has little value for predicting future continuous performances of equipment. The engineered maintenance is most advantageous and offers maximum operating time to reduce down time of the equipment while adding predictive testing technique to aid in determining the frequency of overhaul of equipment. The important checks to be conducted and preventive maintenance programme to be scheduled are discussed in this paper. The safety and reliable functioning of the electrical equipment depend on proper optimal design, selection of equipment, their installation, subsequent maintenance and strict compliance with safety regulations. (author)

  9. Development of divertor remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  10. Development of divertor remote maintenance system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji

    1998-01-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  11. Clustering condition-based maintenance for a multi-unit system with aperiodic inspections

    NARCIS (Netherlands)

    Olde Keizer, Minou C.A.; Teunter, Ruud H.; Podofillini, Luca; Sudret, Bruno; Stojadinović, Božidar; Zio, Enrico; Kröger, Wolfgang

    2015-01-01

    Condition-Based Maintenance (CBM) is a predictive maintenance strategy, which bases the maintenance scheduling on condition measurements of the components. In this paper, we continue work on the CBM optimization approach proposed by Castanier, B., A. Grall & C. Bérenguer (2005). A condition-based

  12. Application of genetic algorithms to the maintenance scheduling optimization in a nuclear system basing on reliability; Aplicacao de algoritmos geneticos na otimizacao da politica de manutencoes preventivas de um sistema nuclear centrada em confiabilidade

    Energy Technology Data Exchange (ETDEWEB)

    Lapa, Celso M. Franklin; Pereira, Claudio M.N.A.; Mol, Antonio C. de Abreu [Instituto de Engenharia Nuclear (IEN), Rio de Janeiro, RJ (Brazil)

    1999-07-01

    This paper presents a solution based on genetic algorithm and probabilistic safety analysis that can be applied in the optimization of the preventive maintenance politic of nuclear power plant safety systems. The goal of this approach is to improve the average availability of the system through the optimization of the preventive maintenance scheduling politic. The auxiliary feed water system of a two loops pressurized water reactor is used as a sample case, in order to demonstrate the effectiveness of the proposed method. The results, when compared to those obtained by some standard maintenance politics, reveal quantitative gains and operational safety levels. (author)

  13. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  14. An information system supporting design for reliability and maintenance

    International Nuclear Information System (INIS)

    Rit, J.F.; Beraud, M.T.

    1997-01-01

    EDF is currently developing a methodology to integrate availability, operating experience and maintenance in the design of power plants. This involves studies that depend closely on the results and assumptions of each other about the reliability and operations of the plant. Therefore a support information system must be carefully designed. Concurrently with development of the methodology, a research oriented information system was designed and built. It is based on the database model of a logistic support repository that we tailored to our needs. (K.A.)

  15. An information system supporting design for reliability and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Rit, J.F.; Beraud, M.T

    1997-12-31

    EDF is currently developing a methodology to integrate availability, operating experience and maintenance in the design of power plants. This involves studies that depend closely on the results and assumptions of each other about the reliability and operations of the plant. Therefore a support information system must be carefully designed. Concurrently with development of the methodology, a research oriented information system was designed and built. It is based on the database model of a logistic support repository that we tailored to our needs. (K.A.) 10 refs.

  16. Improving CANDU plant operation and maintenance through retrofit information technology systems

    International Nuclear Information System (INIS)

    Lupton, L.R.; Judd, R.A.; MacBeth, M.J.

    1998-01-01

    CANDU plant owners are facing an increasingly competitive environment for the generation of electricity. To meet this challenge, all owners have identified that information technology offers opportunities for significant improvements in CANDU operation, maintenance and administration (OM and A) costs. Targeted information technology application areas include instrumentation and control, engineering, construction, operations and plant information management. These opportunities also pose challenges and issues that must be addressed if the full benefits of the advances in information technology are to be achieved. Key among these are system hardware and software maintenance, and obsolescence protection; AECL has been supporting CANDU stations with the initial development and evaluation of systems to improve plant performance and cost. Key initiatives that have been implemented or are in the process of being implemented in some CANDU plants to achieve operational benefits include: critical safety parameter monitor system; advanced computerized annunciation system; plant historical data system; and plant display system. Each system will be described in terms of its role in enhancing current CANDU plant performance and how they will contribute to future CANDU plant performance

  17. A Naval Aviation Maintenance Organizational Activity Strategic Information System (OASIS)

    Science.gov (United States)

    1990-03-01

    Management Plan ( CIMP ) [Ref. 49] lists all information systems currently being planned or developed to support NAVAIR missions. The four "functional...in the CIMP . They include local area networks (LANs) for specific commands, systems dedicated to supporting one level of maintenance, systems designed

  18. 77 FR 58856 - Notice of Proposed Information Collection: Comment Request; Maintenance Wage Rate Recommendation...

    Science.gov (United States)

    2012-09-24

    ...-assisted low-income or affordable housing are paid no less than prevailing wages that are determined or... Information Collection: Comment Request; Maintenance Wage Rate Recommendation, and Maintenance Wage Rate Survey; and Report of Additional Classification and Wage Rate AGENCY: Office of Departmental Operations...

  19. Reliability centred maintenance of nuclear power plant facilities

    International Nuclear Information System (INIS)

    Kovacs, Zoltan; Novakova, Helena; Hlavac, Pavol; Janicek, Frantisek

    2011-01-01

    A method for the optimization of preventive maintenance nuclear power plant equipment, i.e. reliability centred maintenance, is described. The method enables procedures and procedure schedules to be defined such as allow the maintenance cost to be minimized without compromising operational safety or reliability. Also, combinations of facilities which remain available and ensure reliable operation of the reactor unit during the maintenance of other pieces of equipment are identified. The condition-based maintenance concept is used in this process, thereby preventing unnecessary operator interventions into the equipment, which are often associated with human errors. Where probabilistic safety assessment is available, the most important structures, systems and components with the highest maintenance priority can be identified. (orig.)

  20. Impacts of building information modeling on facility maintenance management

    Energy Technology Data Exchange (ETDEWEB)

    Ahamed, Shafee; Neelamkavil, Joseph; Canas, Roberto [Centre for Computer-assisted Construction Technologies, National Research Council of Canada, London, Ontario (Canada)

    2010-07-01

    Building information modeling (BIM) is a digital representation of the physical and functional properties of a building; it has been used by construction professionals for a long time and stakeholders are now using it in different aspects of the building lifecycle. This paper intends to present how BIM impacts the construction industry and how it can be used for facility maintenance management. The maintenance and operations of buildings are in most cases still managed through the use of drawings and spreadsheets although life cycle costs of a building are significantly higher than initial investment costs; thus, the use of BIM could help in achieving a higher efficiency and so important benefits. This study is part of an ongoing research project, the nD modeling project, which aims at predicting building energy consumption with better accuracy.

  1. Application of condition based maintenance to nuclear power plants

    International Nuclear Information System (INIS)

    Sonoda, Yukio; Nakano, Tomohito; Shimizu, Shunichi; Iida, Jun; Atomura, Masakazu; Abe, Masahiro

    2002-01-01

    Device Karte management system which supports application of condition based maintenance to nuclear power plants has been developed. The purpose of this system is to support maintenance personnel in device inspection scheduling based on operating condition monitoring and maintenance histories. There are four functions: field database, degradation estimation, inspection time decision and maintenance planning. The authors have been applying this system to dozens of devices of Onagawa Nuclear Power Station Unit No. 1 for one year. This paper represents the system concept and its application experiences. (author)

  2. Reliability in maintenance and design of elastomer sealed closures

    International Nuclear Information System (INIS)

    Lake, W.H.

    1978-01-01

    The methods of reliability are considered for maintenance and design of elastomer sealed containment closures. Component reliability is used to establish a replacement schedule for system maintenance. Reliability data on elastomer seals is used to evaluate the common practice of annual replacement, and to calculate component reliability values for several typical shipment time periods. System reliability methods are used to examine the relative merits of typical closure designs. These include single component and redundant seal closure, with and without closure verification testing. The paper presents a general method of quantifying the merits of closure designs through the use of reliability analysis, which is a probabilistic technique. The reference list offers a general source of information in the field of reliability, and should offer the opportunity to extend the procedures discussed in this paper to other design safety applications

  3. Components installation. Scheduling techniques applied at Framatome for the French nuclear program

    International Nuclear Information System (INIS)

    Cremese, G.

    1982-09-01

    The first scheduling objective is a timely delivery of heavy components manufactured by FRAMATOME factories: reactor vessel, steam generators and pressurizer. The second scheduling function is the preparation and updating of overall and detailed schedules for the coordination and follow-up of: design activities, progress at equipment suppliers, construction and erection activities of sub-contractors, test and start-up tasks by FRAMATOME and customer teams, and maintenance operations by FRAMATOME teams. I shall first describe the schedules for the contract first unit then show how the following units of the contract are scheduled in their turn

  4. Sensitive maintenance: a cognitive process underlying individual differences in memory for threatening information.

    Science.gov (United States)

    Peters, Jan H; Hock, Michael; Krohne, Heinz Walter

    2012-01-01

    Dispositional styles of coping with threat influence memory for threatening information. In particular, sensitizers excel over repressors in their memory for threatening information after long retention intervals, but not after short ones. We therefore suggested that sensitizers, but not repressors, employ active maintenance processes during the retention interval to selectively retain threatening material. Sensitive maintenance was studied in 2 experiments in which participants were briefly exposed to threatening and nonthreatening pictures (Experiment 1, N = 128) or words (Experiment 2, N = 145). Following, we administered unannounced recognition tests before and after an intervening task that generated either high or low cognitive load, assuming that high cognitive load would impede sensitizers' memory maintenance of threatening material. Supporting our hypotheses, the same pattern of results was obtained in both experiments: Under low cognitive load, sensitizers forgot less threat material than repressors did; no such differences were observed under high cognitive load.

  5. Maintenance Planning of Offshore Wind Turbine using Condition Monitoring Information

    DEFF Research Database (Denmark)

    Ramírez, José G. Rangel; Sørensen, John Dalsgaard

    2009-01-01

    Deterioration processes such as fatigue and corrosion are typically affecting offshore structures. To "control" this deterioration, inspection and maintenance activities are developed. Probabilistic methodologies represent an important tool to identify the suitable strategy to inspect and control...... the deterioration in structures such as offshore wind turbines (OWT). Besides these methods, the integration of condition monitoring information (CMI) can optimize the mitigation activities as an updating tool. In this paper, a framework for risk-based inspection and maintenance planning (RBI) is applied for OWT....... With the integration of CMI by means Bayesian inference, a slightly change of first inspection times are coming up, influenced by the reduction of the uncertainty and harsher or milder external agents....

  6. Improving CANDU plant operation and maintenance through retrofit information technology systems

    International Nuclear Information System (INIS)

    Lupton, L. R.; Judd, R. A.

    1998-01-01

    CANDU plant owners are facing an increasingly competitive environment for the generation of electricity. To meet this challenge, all owners have identified that information technology offers opportunities for significant improvements in CANDU operation, maintenance and administration (OM and A) costs. Targeted information technology application areas include instrumentation and control, engineering, construction, operations and plant information management. These opportunities also pose challenges and issues that must be addressed if the full benefits of the advances in information technology are to be achieved. Key among these are system hardware and software maintenance, and obsolescence protection. AECL has been supporting CANDU stations with the initial development and evaluation of systems to improve plant performance and cost. Five key initiatives that have been implemented or are in the process of being implemented in some CANDU plants to achieve cooperational benefits include: critical safety parameter monitor system; advanced computerized annunciation system; plant historical data system; plant display system; and digital protection system. Each system will be described in terms of its role in enhancing current CANDU plant performance and how they will contribute to future CANDU plant performance. (author). 8 refs., 3 figs

  7. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  8. Shop Floor Scheduling for Program Depot Maintenance Considering Stochastic Repair Needs

    National Research Council Canada - National Science Library

    Gemmill, Douglas

    2000-01-01

    .... The research resulted in the development of a new method to identify the critical path within resource-constrained project scheduling problems, heuristic search methods that improved overall project...

  9. MOV reliability evaluation and periodic verification scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Bunte, B.D.

    1996-12-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs.

  10. MOV reliability evaluation and periodic verification scheduling

    International Nuclear Information System (INIS)

    Bunte, B.D.

    1996-01-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs

  11. Scheduling Data Access in Smart Grid Networks Utilizing Context Information

    DEFF Research Database (Denmark)

    Findrik, Mislav; Grønbæk, Jesper; Olsen, Rasmus Løvenstein

    2014-01-01

    Current electrical grid is facing increased penetration of intermittent energy resources, in particular wind and solar energy. Fast variability of the power supply due to renewable energy resources can be balanced out using different energy storage systems or shifting the loads. Efficiently...... managing this fast flexibility requires two-way data exchange between a controller and sensors/meters via communication networks. In this paper we investigated scheduling of data collection utilizing meta-data from sensors that are describing dynamics of information. We show the applicability...

  12. A Real-Time Quantitative Condition Alerting and Analysis Support System for Aircraft Maintenance, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Financial constraints and the need for improved operational efficiency are requiring airlines to emphasize "on-condition" maintenance over scheduled maintenance...

  13. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  14. Planning and control of maintenance systems modelling and analysis

    CERN Document Server

    Duffuaa, Salih O

    2015-01-01

    Analyzing maintenance as an integrated system with objectives, strategies and processes that need to be planned, designed, engineered, and controlled using statistical and optimization techniques, the theme of this book is the strategic holistic system approach for maintenance. This approach enables maintenance decision makers to view maintenance as a provider of a competitive edge not a necessary evil. Encompassing maintenance systems; maintenance strategic and capacity planning, planned and preventive maintenance, work measurements and standards, material (spares) control, maintenance operations and control, planning and scheduling, maintenance quality, training, and others, this book gives readers an understanding of the relevant methodology and how to apply it to real-world problems in industry. Each chapter includes a number exercises and is suitable as a textbook or a reference for a professionals and practitioners whilst being of interest to industrial engineering, mechanical engineering, electrical en...

  15. Optimal preventive maintenance and repair policies for multi-state systems

    International Nuclear Information System (INIS)

    Sheu, Shey-Huei; Chang, Chin-Chih; Chen, Yen-Luan; George Zhang, Zhe

    2015-01-01

    This paper studies the optimal preventive maintenance (PM) policies for multi-state systems. The scheduled PMs can be either imperfect or perfect type. The improved effective age is utilized to model the effect of an imperfect PM. The system is considered as in a failure state (unacceptable state) once its performance level falls below a given customer demand level. If the system fails before a scheduled PM, it is repaired and becomes operational again. We consider three types of major, minimal, and imperfect repair actions, respectively. The deterioration of the system is assumed to follow a non-homogeneous continuous time Markov process (NHCTMP) with finite state space. A recursive approach is proposed to efficiently compute the time-dependent distribution of the multi-state system. For each repair type, we find the optimal PM schedule that minimizes the average cost rate. The main implication of our results is that in determining the optimal scheduled PM, choosing the right repair type will significantly improve the efficiency of the system maintenance. Thus PM and repair decisions must be made jointly to achieve the best performance

  16. Stress-reducing preventive maintenance model for a unit under stressful environment

    International Nuclear Information System (INIS)

    Park, J.H.; Chang, Woojin; Lie, C.H.

    2012-01-01

    We develop a preventive maintenance (PM) model for a unit operated under stressful environment. The PM model in this paper consists of a failure rate model and two cost models to determine the optimal PM scheduling which minimizes a cost rate. The assumption for the proposed model is that stressful environment accelerates the failure of the unit and periodic maintenances reduce stress from outside. The failure rate model handles the maintenance effect of PM using improvement and stress factors. The cost models are categorized into two failure recognition cases: immediate failure recognition and periodic failure detection. The optimal PM scheduling is obtained by considering the trade-off between the related cost and the lifetime of a unit in our model setting. The practical usage of our proposed model is tested through a numerical example.

  17. Risk-informed decision-making related to the on-line maintenance

    International Nuclear Information System (INIS)

    Cepin, Marko

    2011-01-01

    On-line maintenance (OLM) represents the term, which includes testing and maintenance that is performed when the main generator of the nuclear power plant is connected to the grid. OLM on one side helps to decrease the number of activities, which would be performed during the scheduled outage, but on the other side it may contribute to a different level of risk, if the activity is performed when the plant is operating. If the risk of OLM during the power operation is much larger than the risk of similar activity performed during the shutdown the OLM may not be the desired strategy. Additionally, if the risk of OLM during the power operation is not larger than the risk of similar activity performed during the shutdown, the OLM would be the preferred strategy. The objective of the paper is to show risk evaluations of selected OLM activities of selected real plants and to examine if the current practices are suitable for the new nuclear power plants. The results of risk evaluations of OLM and their comparison show that the criteria or guidelines developed for existing plants are not completely suitable for new plants. The new power plants with expected lower risk measures, which can be lower for more than couple of orders of magnitude compared to existing plants, would be able to deal with OLM in plant configurations which would increase the risk for orders of magnitude, but would still be acceptable in terms of risk, if the existing criteria or guidelines are used. Results suggest that the risk guidelines for the OLM should be updated for their use in the case of new nuclear power plants.

  18. Cask system maintenance in the Federal Waste Management System

    International Nuclear Information System (INIS)

    Pope, R.B.; Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    In early 1988, in support of the development of the transportation system for the Office of Civilian Radioactive Waste Management System (OCRWM), a feasibility study was undertaken to define a the concept for a stand-alone, ''green-field'' facility for maintaining the Federal Waste Management System (FWMS) casks. This study provided and initial layout facility design, an estimate of the construction costs, and an acquisition schedule for a Cask Maintenance Facility (CMF). It also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs derived from the study have been organized for use in the total transportation system decision-making process. Most importantly, they also provide a foundation for continuing design and planning efforts. The feasibility study was based on an assumed stand-alone, ''green-field'' configuration. This design approach provides a comprehensive design evaluation, to guide the development of a cost estimate and to permit flexibility in locating the facility. The following sections provide background information on cask system maintenance, briefly summarizes some of the functional requirements that a CMF must satisfy, provides a physical description of the CMF, briefly discusses the cost and schedule estimates and then reviews the findings of the efforts undertaken since the feasibility study was completed. 15 refs., 3 figs

  19. Task-specific shell for scheduling problems, ARES[sub TM]/SCH. Scheduling mondai muke task tokka shell ARES[sub TM]/SCH

    Energy Technology Data Exchange (ETDEWEB)

    Kojima, S; Narimatsu, K [Toshiba Corp., Tokyo (Japan)

    1994-08-01

    An Expert System (ES) Shell (developed by Toshiba Corp.) which applies to the scheduling of production plan and operation plan is introduced. It describes that this tool is equipped with flowchart editor and constraint condition editor which mention the knowledge related to scheduling method, and that the former expresses scheduling procedure knowledge in the form of flowchart by combining basic tasks prepared beforehand, and the latter expresses constraint conditions which should be satisfied by the schedule, and knowledge related to the priority order which should be considered in-between in the form of IF-THEN Rule which is very close to Japanese. In addition, the knowledge is equipped with knowledge debugging system which conducts debugging while executing the knowledge. It adds that by using this tool, the manhour required for the development and maintenance of ES can be reduced considerably. 2 refs., 3 figs.

  20. Operation and maintenance support expert systems for BWR nuclear power plants

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo; Hayakawa, Hiroyasu; Fukutomi, Shigeki

    1990-01-01

    Toshiba has been developing expert systems for operation and maintenance support in BWRs. These expert systems are designed to be integrated with conventional plant monitoring systems, and maintenance management systems to provide both comprehensive and powerful support capabilities. Some of these expert systems are already being used on a trial basis both within Toshiba and in electric power utility companies. This paper describes expert systems for the support of plant and equipment monitoring, maintenance scheduling, and maintenance work procedure planning. (author)

  1. 76 FR 23860 - Financial Management Service Proposed Collection of Information: Schedule of Excess Risks

    Science.gov (United States)

    2011-04-28

    ... DEPARTMENT OF THE TREASURY Fiscal Service Financial Management Service Proposed Collection of Information: Schedule of Excess Risks AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Notice and request for comments. SUMMARY: The Financial Management Service, as part of its continuing...

  2. The Preventive Signaling Maintenance Crew Scheduling Problem for European Railway Traffic Management system (ERTMS)

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad; Stidsen, Thomas Jacob Riis; Rasmussen, Kourosh Marjani

    , the western part of Denmark. This case is particularly interesting, since the entire railway signalling system is currently being upgraded to the new European Railway Traffic Management System (ERTMS) standard. The new signals need continuous maintenance and in this article we plan the distribution of crew......A railway system is a large and complex infrastructure, which requires continuous maintenance in order to function correctly. Proper maintenance is critical but can also be costly. In this paper we consider the practical case of planning the preventive maintenance of railway signals in Jutland...

  3. Using Decision Analysis to Select Facility Maintenance Management Information Systems

    Science.gov (United States)

    2010-03-01

    Hart, A., & Ratnieks, F. L. (2002). Waste management in the leaf-cutting ant Atta colombica. Behavioral Ecology , 224-231. Heintz, J., Pollin ... Pollin , & Garret-Peltier, 2009). Maintenance departments can help themselves by implementing an information system to help better manage personnel...Wastewater collection system infrastructure research needs in the USA. Urban Water , 21-29. Takata, S., Kimura, F., van Houten, F., Westkamper, E

  4. Efficient Workplan Management in Maintenance Tasks

    NARCIS (Netherlands)

    Wilson, M.; Roos, N.; Huisman, B.; Witteveen, C.

    2011-01-01

    NedTrain is a Dutch company tasked with performing the maintenance of the rolling stock of the national railway company, NS. NedTrain owns several workshops at different locations. The scheduling in one such workshop will be taken as point of departure for the discussion in this paper. After

  5. Coordinated preventive maintenance scheduling of GENCO and TRANSCO in restructured power systems

    International Nuclear Information System (INIS)

    Geetha, T.; Swarup, K. Shanti

    2009-01-01

    Preventive maintenance of generating units and lines, in a competitive electric energy environment is proposed. Inclusion of transmission constraints and forced outage rates, over a specified operational period is considered. For generator maintenance the objective of the ISO is to maintain adequate level of reliability throughout the operational period, for which Bender's decomposition technique is used. The objective of the GENCO is to maximize profit or to minimize loss in profit, for which transmission constrained price based unit commitment (TCPBUC), based on Lagrangian relaxation method is used. Bender's decomposition technique is used for line maintenance, with adequate level of reliability. A coordinating technique using penalty factors is incorporated to obtain convergence of the conflicting objectives. The transmission constraints are modeled using dc sensitivity factors. Detailed case studies of six-bus systems and IEEE RTS system are presented and discussed. (author)

  6. The right maintenance on the right components, at the right time, with the right parts: maintaining high plant reliability through an effective maintenance program

    International Nuclear Information System (INIS)

    Von Hatten, P.

    2008-01-01

    The objective of the maintenance program at a Nuclear Power Plant is to be proactive and prevent unexpected failures of equipment that can impact on Nuclear or Conventional Safety and Plant Production. This does not mean that all equipment failures will be prevented; in a number of cases the most cost effective solution is to allow equipment to run to failure. Deciding what components are critical to the plant is the first step. The industry uses guidance from INPO Advanced Process, AP913, to classify components as Critical, Non Critical or Run to Failure based on the consequence of the failure. Once this is complete, then the right maintenance program needs to be specified. This is done through utilization of experience from the industry based on the type of component. Maintenance strategies and templates have been produced for most power plant components. Each station or fleet needs then to apply the criteria, with exceptions as required, to determine the maintenance requirements and frequency for their components. This includes predictive and preventative maintenance. The more critical the component is the more rigorous the maintenance requirements. Once the maintenance program is defined it can be implemented. This requires that the Preventative Maintenance (PM's) are updated to ensure the correct tasks are in place and the frequency is correct. Work Management will group the PM's so they can scheduled efficiently and to minimize equipment down time. The last element is to ensure that the required parts are specified and are stocked or readily available for the maintenance when it is scheduled. This is an ongoing effort since components become obsolete or suppliers go out of business or change hands. (author)

  7. Maintenance of the Hanford cone penetrometer platform during fiscal year 1999

    International Nuclear Information System (INIS)

    IWATATE, D.F.

    1998-01-01

    This SOW describes services requested of Applied Research and Associates, Inc. (ARA), as a commercial provider of cone penetrometer equipment and services, to provide routine inspection and minimum preventive maintenance on the Hanford CP Platform (CPP) during Fiscal Year 1999. This SOW specifically pertains to the maintenance of the CPP and associated support equipment and is limited in scope to routine preventive maintenance and identification of any deficiencies. ARA is the original manufacturer of the CPP and will conduct this work following the vendor-prepared maintenance schedule

  8. 46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Science.gov (United States)

    2010-10-01

    ... and cleaning each fuel tank, and refilling it with fresh fuel. (2) Each davit, winch, fall and other...(e); (ii) Maintenance and repair instructions; (iii) A schedule of periodic maintenance; (iv) A... repair equipment. Spare parts and repair equipment must be provided for each lifesaving appliance and...

  9. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    International Nuclear Information System (INIS)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP's current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes

  10. Guidance for the design and management of a maintenance plan to assure safety and improve the predictability of a DOE nuclear irradiation facility. Final report

    International Nuclear Information System (INIS)

    Booth, R.S.; Kryter, R.C.; Shepard, R.L.; Smith, O.L.; Upadhyaya, B.R.; Rowan, W.J.

    1994-10-01

    A program is recommended for planning the maintenance of DOE nuclear facilities that will help safety and enhance availability throughout a facility's life cycle. While investigating the requirements for maintenance activities, a major difference was identified between the strategy suitable for a conventional power reactor and one for a research reactor facility: the latter should provide a high degree of predicted availability (referred to hereafter as ''predictability'') to its users, whereas the former should maximize total energy production. These differing operating goals necessitate different maintenance strategies. A strategy for scheduling research reactor facility operation and shutdown for maintenance must balance safety, reliability,and predicted availability. The approach developed here is based on three major elements: (1) a probabilistic risk analysis of the balance between assured reliability and predictability (presented in Appendix C), (2) an assessment of the safety and operational impact of maintenance activities applied to various components of the facility, and (3) a data base of historical and operational information on the performance and requirements for maintenance of various components. These factors are integrated into a set of guidelines for designing a new highly maintainable facility, for preparing flexible schedules for improved maintenance of existing facilities, and for anticipating the maintenance required to extend the life of an aging facility. Although tailored to research reactor facilities, the methodology has broader applicability and may therefore be used to improved the maintenance of power reactors, particularly in anticipation of peak load demands

  11. RCM optimization of a system under both preventive and corrective maintenance

    International Nuclear Information System (INIS)

    Bris, R.; Cepin, M.

    2005-01-01

    Testing and maintenance activities of power electrical equipment are an important potential for both risk and cost reduction. A multi-objective maintenance optimization method is presented based on the Genetic Algorithms (GA) technique. The method determines the optimal schedule of preventive maintenance actions based on minimization both selected risk measure and cost. Applied cost model takes into account both preventive and corrective maintenance. This paper also presents application of the methodology to optimize maintenance of a real distribution network 22 kV. Conclusions and recommendations for practice are made on the basis of obtained results. (author)

  12. On-line maintenance PSA support at NPP Krsko

    International Nuclear Information System (INIS)

    Prosen, R.; Vrbanic, I.; Kastelan, M.

    2000-01-01

    In 1997 Krsko NPP initiated the on-line maintenance (OLM) practice. On-line maintenance constitutes of corrective activities, preventive activities, surveillance activities, tests and inspections, as well as calibrations and modifications, taking place during the normal power operations. The on-line maintenance is a multidisciplinary process consisting of activity specification, planning, and preparation and performing of the OLM activity of interest. The primary role of the PSA group is to assess from the r isk perspective , using the plant-specific NEK PSA model, system unavailability and the impact to the plant operational risk. The intent is to support planning of the on-line maintenance activities from the risk perspective. The risk evaluation of the OLM activities is based on the probability of core damage evaluation for the defined discrete plant configuration states, determined by the OLM activities. Within this application, the optimized, plant-specific PSA model is used on Risk Spectrum platform. To perform the risk assessment of the on-line maintenance activities, first the systems to be affected are defined based on the planned OLM activities. The next important step is the assessment of the planned work schedule. To define the final schedule, the co-ordination and optimizing the planned OLM activities needs activation of all participating departments, supported also from PSA group. The P3 (i.e. Primavera) planning tool system windows are defined for different systems and groups of systems, and the activities are sorted in particular weeks according to these windows. (author)

  13. Design of comprehensive plant information system considering maintenance indicators in nuclear power plant

    International Nuclear Information System (INIS)

    Takata, Takashi; Yamaguchi, Akira; Yamamoto, Akio

    2013-01-01

    A safety of a nuclear power plant must be ensured and maintained through its entire plant life. For this plant life cycle safety (PLCS), a comprehensive plant information system, in which an each maintenance record of the plant is taken into consideration, is of importance. In this paper, a development of a plant chart, which is a part of the information system, has been developed based on a defense-in-depth concept that is one of the most important concept to ensure the plant safety. In the chart, an updated probability of loss of a component or function is used as a maintenance indicator and a probabilistic risk assessment (PRA) method is applied to quantify the plant status in the chart. (author)

  14. 17 CFR 289.101 - Schedule A. Information required in reports pursuant to § 289.3.

    Science.gov (United States)

    2010-04-01

    ... TO SECTION 13(a) OF THE INTERNATIONAL FINANCE CORPORATION ACT § 289.101 Schedule A. Information... allowed or paid to dealers. If any dealers are to act in the capacity of sub-underwriters and are to be...

  15. Attentional and non-attentional systems in the maintenance of verbal information in working memory: the executive and phonological loops

    OpenAIRE

    Camos Valerie; Barrouillet Pierre

    2014-01-01

    Working memory is the structure devoted to the maintenance of information at short term during concurrent processing activities. In this respect, the question regarding the nature of the mechanisms and systems fulfilling this maintenance function is of particular importance and has received various responses in the recent past. In the time-based resource-sharing (TBRS) model, we suggest that only two systems sustain the maintenance of information at the short term, counteracting the deleterio...

  16. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  17. EFFICIENT MULTI-OBJECTIVE EVOLUTIONARY ALGORITHM FOR JOB SHOP SCHEDULING

    Institute of Scientific and Technical Information of China (English)

    Lei Deming; Wu Zhiming

    2005-01-01

    A new representation method is first presented based on priority rules. According to this method, each entry in the chromosome indicates that in the procedure of the Giffler and Thompson (GT) algorithm, the conflict occurring in the corresponding machine is resolved by the corresponding priority rule. Then crowding-measure multi-objective evolutionary algorithm (CMOEA) is designed,in which both archive maintenance and fitness assignment use crowding measure. Finally the comparisons between CMOEA and SPEA in solving 15 scheduling problems demonstrate that CMOEA is suitable to job shop scheduling.

  18. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    Energy Technology Data Exchange (ETDEWEB)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  19. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  20. Development of the tool infrastructure for implementation of the maintenance rule

    International Nuclear Information System (INIS)

    Lo, Chung-Kung; Hsu, Pi-Lin

    2009-01-01

    INER PSA Group helps the three operating plants in Taiwan to decide the importance of their scoped-in equipment in terms of risk significance and develop the application database software (MEMOS) to implement the maintenance effectiveness monitoring process. NER also develops a software tool (MIRU) used in the on-line maintenance scheduling and risk assessment process. It serves as a platform for the plants to plan their daily maintenance activities and perform the risk assessment in the future rolling on-line maintenance. The implementation of routine on-line maintenance will be a critical step towards improving the capacity factors and thus further enhancement of the performance of nuclear power in Taiwan

  1. Measurement and control system for ITER remote maintenance equipment

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  2. Measurement and control system for ITER remote maintenance equipment

    International Nuclear Information System (INIS)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro

    1998-01-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  3. 40 CFR 63.7826 - How do I demonstrate initial compliance with the operation and maintenance requirements that...

    Science.gov (United States)

    2010-07-01

    ... preventative maintenance schedule and, as applicable, detailed descriptions of the corrective action procedures... compliance with the operation and maintenance requirements that apply to me? 63.7826 Section 63.7826... Compliance Requirements § 63.7826 How do I demonstrate initial compliance with the operation and maintenance...

  4. 78 FR 44191 - Proposed Collection of Information: Annual Financial Statement of Surety Companies-Schedule F

    Science.gov (United States)

    2013-07-23

    ... Bureau of the Fiscal Service solicits comments concerning the Form FMS-6314 ``Annual Financial Statement... described below: Title: Annual Financial Statement of Surety Companies--Schedule F. OMB Number: 1510-0012... DEPARTMENT OF THE TREASURY Fiscal Service Proposed Collection of Information: Annual Financial...

  5. Optimisation of distributed maintenance: Modelling and application to the multi-factory production

    Energy Technology Data Exchange (ETDEWEB)

    Simeu-Abazi, Zineb, E-mail: Zineb.Simeu-Abazi@g-scop.inpg.fr [Laboratory G-SCOP, 46 Avenue Felix Viallet, 38031 Grenoble Cedex 1 (France); Ahmad, Alali Alhouaij [Laboratory G-SCOP, 46 Avenue Felix Viallet, 38031 Grenoble Cedex 1 (France)

    2011-11-15

    This paper concerns the modelling and the cost evaluation of maintenance activities in a distributed context. In this work we study the particular case where the maintenance activities are executed by two workshops: a central maintenance workshop (CMW) and a mobile maintenance workshop (MMW). The CMW concerns the repairing process for the corrective maintenance and the MMW executes all preventive maintenance in several factories according to a defined scheduling. The aim is to take into account the resources (spare parts in the MMW) and maintenance actions for a given operating budget. A modular approach for modelling a multi-site structure is proposed to achieve the aim of improving the availability of facilities on production sites while minimising the cost of maintenance.

  6. 海上风电机群维修排程在线多目标决策模型%On-line Multi-objective Decision Model for the Maintenance Scheduling of Offshore Wind Turbine Group

    Institute of Scientific and Technical Information of China (English)

    郭慧东; 王玮; 夏明超

    2017-01-01

    Based on the discussion of the offshore wind turbine characters different than thermal power generator, the framework and decision process of maintenance decision system for wind turbine was introduced, the maintenance operation flow and total maintenance cost of wind turbine was analyzed. On purpose of enhancing the maintenance efficiency and reducing the generation cost of offshore wind turbine group, an on-line multi-objective decision model for the daily maintenance scheduling of offshore wind turbine group was proposed in this paper,which minimizes the total maintenance cost and the workload balance with the constraints of budgets and human resources. The Kruskal spatial analysis algorithm of Geographic Information System (GIS) was applied to find the minimum spanning tree of return path of each maintenance operations combination. The Binary Particle Swarm Optimization (BPSO) was employed to solve the model, and obtains all non-dominated solution set of maintenance turbines combination and their exacted maintenance time. The simulation result shows the feasibility of the proposed model, and the effectiveness of the algorithm is verified.%结合海上风电机群特点,介绍风电机群维修决策系统框架和决策流程,分析风电机组维修作业流程和成本构成.以风电机群整体维修成本、作业工作量均衡性为目标函数,以维修中心物料和人力资源配置为约束条件,建立海上风电机群日间维修作业排程多目标决策模型.采用地理信息系统中的Kruskal空间分析算法寻找每组维修作业的往返路径最小生成树.应用带精英保留策略的离散粒子群算法求解模型,计算出全部待检修机组组合及其具体作业时段的非劣解集.仿真算例分析结果表明,模型可以降低维修总成本,验证了所提模型的可行性以及求解算法的有效性.

  7. Analysis of the ITER ECH Upper Port Launcher remote maintenance using virtual reality

    NARCIS (Netherlands)

    Elzendoorn, B.; Baar, M. de; Chavan, R.; Goodman, T.; Heemskerk, C.; Heidinger, R.; Kleefeldt, K.; Koning, J.; Sanders, S.; Späh, P.; Strauss, D.; Verhoeven, T.; Vreede, F. de

    2009-01-01

    All ITER sub-systems of remote handling (RH) classes 1 and 2 have to be remotely maintainable. The maintenance strategy for these components has to ensure system availability after failure or scheduled maintenance. This paper shows how virtual reality (VR) simulation [1] can be used as a tool to

  8. The development of a 3-d risk matrix for qualitative maintenance risk management

    International Nuclear Information System (INIS)

    Hsu, Pi-Lin; Lo, Chung-Kung

    2009-01-01

    The 3-D Risk Matrix is a web-based tool, developed by the Institute of Nuclear Energy research (INER), to assist plant personnel for qualitative assessment of operational risks inherent with scheduling of system/component maintenance and testing. This paper focuses on a software development for a three-dimensional risk matrix which serves as a sub-function embedded in the Maintenance Rule (MR) risk management tool used by the Taiwan's nuclear power plants. The color in any field of the matrix directly corresponds to the risk condition level of the related plant maintenance configuration. It also informs the operators via graphical interface of the remaining hours before reaching to the potentially more significant risk level. In the 3-D Risk Matrix, the risk levels can be quickly determined since the conditional Core Damage Frequency (CDF) and Large Early Release Frequency (LERF) for each expected and allowed out-of-service sub-systems or trains combination is pre-calculated by INERISKEN. The 3-D Risk Matrix will play an important role to enhance the MR risk management tool during the on-line maintenances in Taiwan's nuclear power plants

  9. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  10. Development of management system for nuclear power plant maintenance and information

    International Nuclear Information System (INIS)

    Nomoto, Toshihiro

    1997-01-01

    In Chubu Electric Power Co., Inc., in order to make maintenance works efficient and improve the management, 'Management system for nuclear power plant maintenance and information' was developed, and its operation on full scale was begun in Hamaoka Nuclear Power Station in October, 1996. This system is composed of equipment management system, maintenance and repair management system and work management system. As the features of the system, the dispersion of functions by client/server method, the installation of the server machines for exclusive use in power stations, the adoption of optical communication network and the ensuring of reliability by the doubled system are mentioned. This system is the function dispersion system by client/server method utilizing the in-plant LAN, and has two server computers with double hot standby constitution. The main functions of three subsystems are described. These three subsystems and piping and instrumentation chart management system and whole company work budget system are connected so as to make dealing works quick and efficient. Hereafter, by reflecting the opinions of the users through the operation, further efficient works are to be aimed at. (K.I.)

  11. A Study on the Effect on Scheduling and Management of Surgeries with the Introduction of Excellent Medical Information.

    Science.gov (United States)

    Mei, Tsai Ching

    2016-01-01

    The services of OR play an important role in the medical business for department of surgery. The most important issue for OR is about the scheduling and management of surgeries. Good surgery schedule could elevate the utilization efficiency of OR. Therefore, the introduction of excellent medical information can both dramatically elevate the work efficiency of health care employees and reduce workload to reach win-win benefits in both management and performance.

  12. Operations and maintenance plans for the TFTR

    International Nuclear Information System (INIS)

    Allen, H.L.; Fedor, B.J.

    1978-01-01

    Princeton University Plasma Physics Laboratory (PPPL) is constructing a Tokamak Fusion Test Reactor (TFTR) scheduled to begin operation for fusion research experiments in late 1981, first with hydrogen and deuterium plasmas and later, in the second phase, using tritium for high power fusion studies. This latter mode will introduce considerable complexity to operation and maintenance of the TFTR in terms of meeting requirements for tritium handling, adequate radiation shielding, and corrective and preventive maintenance procedures. In this paper we discuss plans for the installation and preoperational testing of the major subsystems of TFTR, proposed start-up and operating scenarios for the device and the system of operational control. In addition, the TFTR Maintenance Plan and related procedures for specific major maintenance tasks are described, including the use of remote handling equipment and remote manipulators. Each of these topics is addressed in terms of the current status of planning and development

  13. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  14. Information system design of inventory control spare parts maintenance (valuation class 5000) (case study: plant kw)

    Science.gov (United States)

    Fitriana, Rina; Moengin, Parwadi; Riana, Mega

    2016-02-01

    Plat KW hadn't using optimal inventory level planning yet and hadn't have an information system that well computerized. The research objective is to be able to design an information system related inventory control of spare parts maintenance. The study focused on five types of spare parts with the highest application rate during February 2013- March 2015 and included in the classification of fast on FSN analysis Grinding stones Cut 4". Cable Tie 15". Welding RB 26-32MM. Ring Plat ½" and Ring Plate 5/8 ". Inventory calculation used Economic Order Quantity (EOQ). Safety Stock (SS) and Reorder Point (ROP) methods. System analysis conducted using the framework PIECES with the proposed inventory control system. the performance of the plant KW relating to the supply of spare parts maintenance needs can be more efficient as well as problems at the company can be answered and can perform inventory cost savings amounting Rp.267.066. A computerized information system of inventory control spare parts maintenance provides a menu that can be accessed by each departments as the user needed.

  15. Optimization of the scheduled maintenance on the power units of the nuclear power plants with WWER

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Kovrizhkin, Yu.L.; Kolykhanov, V.N.; Kochneva, V.Yu.; Urbanskij, V.V.

    2008-01-01

    The advanced international and domestic experience in the field of the maintenance optimization of the power units of NPPs, as well, as on the base of the planning optimization, the maintenance organization and carrying out, the technical maintenance and repair control system automatization, the testing and monitoring optimization during the service process, the modernization of the technology and technical tools of the maintenance service and control is represented

  16. Use of knowledge based systems for rational reliability analysis based inspection and maintenance planning for offshore structures

    International Nuclear Information System (INIS)

    Tang, M.X.; Dharmavasan, S.; Peers, S.M.C.

    1994-01-01

    The structural integrity of fixed offshore platforms is ensured by periodic inspections. In the past, decisions made as to when, where and how to inspect have been made by engineers using rules-of-thumb and general planning heuristics. It is now hoped that more rational inspection and maintenance scheduling may be carried out by applying recently developed techniques based on structural reliability methods. However, one of the problems associated with a theoretical approach is that it is not always possible to incorporate all the constraints that are present in a practical situation. These constraints modify the decisions made for analysis data input and the interpretation of the analysis results. Knowledge based systems provide a mean of encapsulating several different forms of information and knowledge within a computer system and hence can overcome this problem. In this paper, a prototype system being developed for integrating reliability based analysis with other constraints for inspection scheduling will be described. In addition, the scheduling model and the algorithms to carry out the scheduling will be explained. Furthermore, implementation details are also given

  17. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  18. A preventive maintenance model for leased equipment subject to internal degradation and external shock damage

    International Nuclear Information System (INIS)

    Zhou, Xiaojun; Wu, Changjie; Li, Yanting; Xi, Lifeng

    2016-01-01

    A periodic preventive maintenance modeling method is proposed for leased equipment with continuous internal degradation and stochastic external shock damage considered simultaneously, which can facilitate the equipment lessor to optimize the maintenance schedule for the same kind of equipment rented by different lessees. A novel interactive mechanism between the continuous internal degradation and the stochastic external shock damage is established on the hazard rate of the equipment with integrating the imperfect effect of maintenance. Two improvement factors are defined for the modeling of imperfect maintenance. The number of failures resulting from internal degradation and from external shocks are both mathematically deduced based on this interactive mechanism. The optimal preventive maintenance scheme is obtained by minimizing the cumulative maintenance cost throughout the lease period. Numerical example shows that the proposed preventive maintenance model not only can reflect the reliability status of the equipment but also can clearly distinguish between the impact from internal degradation and that from external shocks. - Highlights: • We propose an imperfect periodic preventive maintenance model for leased equipment. • It can distinguish between the impact from internal degradation and that from external shocks. • An internal–external interactive mechanism is proposed. • Two improvement factors are introduced into the modeling of imperfect maintenance. • The model is helpful for the PM scheduling of the same equipment rented by different lessees.

  19. Network maintenance

    CERN Multimedia

    GS Department

    2009-01-01

    A site-wide network maintenance operation has been scheduled for Saturday 28 February. Most of the network devices of the general purpose network will be upgraded to a newer software version, in order to improve our network monitoring capabilities. This will result in a series of short (2-5 minutes) random interruptions everywhere on the CERN sites throughout the day. This upgrade will not affect the Computer Centre itself, Building 613, the Technical Network and the LHC experiments, dedicated networks at the pits. For further details of this intervention, please contact Netops by phone 74927 or e-mail mailto:Netops@cern.ch. IT/CS Group

  20. Network maintenance

    CERN Multimedia

    IT Department

    2009-01-01

    A site wide network maintenance has been scheduled for Saturday 28 February. Most of the network devices of the General Purpose network will be upgraded to a newer software version, in order to improve our network monitoring capabilities. This will result in a series of short (2-5 minutes) random interruptions everywhere on the CERN sites along this day. This upgrade will not affect: the Computer centre itself, building 613, the Technical Network and the LHC experiments dedicated networks at the pits. Should you need more details on this intervention, please contact Netops by phone 74927 or email mailto:Netops@cern.ch. IT/CS Group

  1. Field maintenance of radiation-shielding windows at HFEF

    International Nuclear Information System (INIS)

    Tobias, D.A.

    1983-01-01

    The achievement of excellent viewing through hot-cell shielding windows does not occur by chance. Instead, it requires a well planned and executed program of field maintenance. The lack of such a program is a major factor when a hot-cell facility has poor window viewing. At HFEF, all preventive maintenance is performed by one group of trained technical-support personnel under the immediate direction of a Systems Engineer, who has responsibility for the shielding windows. Window maintenance is prescheduled and recorded by being incorporated into the computerized Maintenance Data System (MDS). Measurements of window light transmission are scheduled annually to determine glass browning or oil cloudiness conditions within the window tank. The tank oil is sampled and chemically analyzed annually to determine the moisture content, the acidity, and the probable deterioration rate caused by irradiation

  2. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  3. A General State-Space Formulation for Online Scheduling

    Directory of Open Access Journals (Sweden)

    Dhruv Gupta

    2017-11-01

    Full Text Available We present a generalized state-space model formulation particularly motivated by an online scheduling perspective, which allows modeling (1 task-delays and unit breakdowns; (2 fractional delays and unit downtimes, when using discrete-time grid; (3 variable batch-sizes; (4 robust scheduling through the use of conservative yield estimates and processing times; (5 feedback on task-yield estimates before the task finishes; (6 task termination during its execution; (7 post-production storage of material in unit; and (8 unit capacity degradation and maintenance. Through these proposed generalizations, we enable a natural way to handle routinely encountered disturbances and a rich set of corresponding counter-decisions. Thereby, greatly simplifying and extending the possible application of mathematical programming based online scheduling solutions to diverse application settings. Finally, we demonstrate the effectiveness of this model on a case study from the field of bio-manufacturing.

  4. Optimizing Maintenance Planning in the Production Industry Using the Markovian Approach

    Directory of Open Access Journals (Sweden)

    B Kareem

    2012-12-01

    Full Text Available Maintenance is an essential activity in every manufacturing establishment, as manufacturing effectiveness counts on the functionality of production equipment and machinery in terms of their productivity and operational life. Maintenance cost minimization can be achieved by adopting an appropriate maintenance planning policy. This paper applies the Markovian approach to maintenance planning decision, thereby generating optimal maintenance policy from the identified alternatives over a specified period of time. Markov chains, transition matrices, decision processes, and dynamic programming models were formulated for the decision problem related to maintenance operations of a cable production company. Preventive and corrective maintenance data based on workloads and costs, were collected from the company and utilized in this study. The result showed variability in the choice of optimal maintenance policy that was adopted in the case study. Post optimality analysis of the process buttressed the claim. The proposed approach is promising for solving the maintenance scheduling decision problems of the company.

  5. Effects of body lean and visual information on the equilibrium maintenance during stance.

    Science.gov (United States)

    Duarte, Marcos; Zatsiorsky, Vladimir M

    2002-09-01

    Maintenance of equilibrium was tested in conditions when humans assume different leaning postures during upright standing. Subjects ( n=11) stood in 13 different body postures specified by visual center of pressure (COP) targets within their base of support (BOS). Different types of visual information were tested: continuous presentation of visual target, no vision after target presentation, and with simultaneous visual feedback of the COP. The following variables were used to describe the equilibrium maintenance: the mean of the COP position, the area of the ellipse covering the COP sway, and the resultant median frequency of the power spectral density of the COP displacement. The variability of the COP displacement, quantified by the COP area variable, increased when subjects occupied leaning postures, irrespective of the kind of visual information provided. This variability also increased when vision was removed in relation to when vision was present. Without vision, drifts in the COP data were observed which were larger for COP targets farther away from the neutral position. When COP feedback was given in addition to the visual target, the postural control system did not control stance better than in the condition with only visual information. These results indicate that the visual information is used by the postural control system at both short and long time scales.

  6. LHC Report: The machine under maintenance

    CERN Multimedia

    Katy Foraz for the LHC Team

    2012-01-01

    The LHC Christmas break started on 12 December. Since then, teams have been working hard to complete all the maintenance work planned to ensure the reliable operation of the LHC in 2012.   Installation of shielding at Point 1. The maintenance work is being carried out on key infrastructure such as the cooling, ventilation, electricity and safety systems. Maintenance work is being carried out not just in the LHC but also across the whole accelerator complex, which makes planning the work even more complicated. At the time of going to print, 50% of the cryogenics system maintenance has been finished, which, according to the schedule, will allow the LHC teams to start cooling down the first sectors next week to have the entire machine cold by the end of February. A lot of activity is going on in order to mitigate the effects of radiation on equipment installed in the LHC tunnel and underground areas during 2012 operation. To this end, teams have installed additional shielding at Point 1 (see ph...

  7. Integrating the sequence dependent setup time open shop problem and preventive maintenance policies

    Directory of Open Access Journals (Sweden)

    K. Naboureh

    2016-09-01

    Full Text Available In most industrial environments, it is usually considered that machines are accessible throughout the planning horizon, but in real situation, machines may be unavailable due to a scheduled preventive maintenance where the periods of unavailability are known in advance. The main idea of this paper is to consider different preventive maintenance policies on machines regarding open shop scheduling problem (OSSP with sequence dependent setup times (SDST using immune algorithm. The preventive maintenance (PM policies are planned for maximizing availability of machines or keeping minimum level of reliability through the production horizon. The objective function of the paper is to minimize makespan. In total, the proposed algorithm extensively is compared with six adaptations of existing heuristic and meta-heuristic methods for the problem through data sets from benchmarks based on Taillard’s instances with some adjustments. The results show that the proposed algorithm outperforms other algorithms for this problem.

  8. Maintenance optimization in nuclear power plants through genetic algorithms

    International Nuclear Information System (INIS)

    Munoz, A.; Martorell, S.; Serradell, V.

    1999-01-01

    Establishing suitable scheduled maintenance tasks leads to optimizing the reliability of nuclear power plant safety systems. The articles addresses this subject, whilst endeavoring to tackle an overall optimization process for component availability and safety systems through the use of genetic algorithms. (Author) 20 refs

  9. Remote operation and automation of the maintenance works under the radiation field

    Energy Technology Data Exchange (ETDEWEB)

    Asai, T; Koga, A; Shirasu, I; Miida, T

    1983-06-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenance works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today is difficult to replace with machines due to their diversified and complex nature.

  10. Remote operation and automation of the maintenance works under the radiation field

    Energy Technology Data Exchange (ETDEWEB)

    Asai, Takashi; Koga, Akihiko; Shirasu, Isao; Miida, Toshiro [Mitsubishi Heavy Industries Ltd., Tokyo (Japan)

    1983-08-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenence works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today are so difficult to replace with machines due to their deversified and complexed nature.

  11. Remote operation and automation of the maintenance works under the radiation field

    Energy Technology Data Exchange (ETDEWEB)

    Asai, Takashi; Koga, Akihiko; Shirasu, Isao; Miida, Toshiro [Mitsubishi Heavy Industries Ltd., Tokyo (Japan)

    1983-01-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenance works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today is so defficult to replace with machines due to their diversified and complexed nature.

  12. Towards an Information Model of Consistency Maintenance in Distributed Interactive Applications

    Directory of Open Access Journals (Sweden)

    Xin Zhang

    2008-01-01

    Full Text Available A novel framework to model and explore predictive contract mechanisms in distributed interactive applications (DIAs using information theory is proposed. In our model, the entity state update scheme is modelled as an information generation, encoding, and reconstruction process. Such a perspective facilitates a quantitative measurement of state fidelity loss as a result of the distribution protocol. Results from an experimental study on a first-person shooter game are used to illustrate the utility of this measurement process. We contend that our proposed model is a starting point to reframe and analyse consistency maintenance in DIAs as a problem in distributed interactive media compression.

  13. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  14. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  15. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  16. A bridge network maintenance framework for Pareto optimization of stakeholders/users costs

    International Nuclear Information System (INIS)

    Orcesi, Andre D.; Cremona, Christian F.

    2010-01-01

    For managing highway bridges, stakeholders require efficient and practical decision making techniques. In a context of limited bridge management budget, it is crucial to determine the most effective breakdown of financial resources over the different structures of a bridge network. Bridge management systems (BMSs) have been developed for such a purpose. However, they generally rely on an individual approach. The influence of the position of bridges in the transportation network, the consequences of inadequate service for the network users, due to maintenance actions or bridge failure, are not taken into consideration. Therefore, maintenance strategies obtained with current BMSs do not necessarily lead to an optimal level of service (LOS) of the bridge network for the users of the transportation network. Besides, the assessment of the structural performance of highway bridges usually requires the access to the geometrical and mechanical properties of its components. Such information might not be available for all structures in a bridge network for which managers try to schedule and prioritize maintenance strategies. On the contrary, visual inspections are performed regularly and information is generally available for all structures of the bridge network. The objective of this paper is threefold (i) propose an advanced network-level bridge management system considering the position of each bridge in the transportation network, (ii) use information obtained at visual inspections to assess the performance of bridges, and (iii) compare optimal maintenance strategies, obtained with a genetic algorithm, when considering interests of users and bridge owner either separately as conflicting criteria, or simultaneously as a common interest for the whole community. In each case, safety and serviceability aspects are taken into account in the model when determining optimal strategies. The theoretical and numerical developments are applied on a French bridge network.

  17. The applicability of knowledge-based scheduling to the utilities industry

    International Nuclear Information System (INIS)

    Yoshimoto, G.; Gargan, R. Jr.; Duggan, P.

    1992-01-01

    The Electric Power Research Institute (EPRI), Nuclear Power Division, has identified the three major goals of high technology applications for nuclear power plants. These goals are to enhance power production through increasing power generation efficiency, to increase productivity of the operations, and to reduce the threats to the safety of the plant. Our project responds to the second goal by demonstrating that significant productivity increases can be achieved for outage maintenance operations based on existing knowledge-based scheduling technology. Its use can also mitigate threats to potential safety problems by means of the integration of risk assessment features into the scheduler. The scheduling approach uses advanced techniques enabling the automation of the routine scheduling decision process that previously was handled by people. The process of removing conflicts in scheduling is automated. This is achieved by providing activity representations that allow schedulers to express a variety of different scheduling constraints and by implementing scheduling mechanisms that simulate kinds of processes that humans use to find better solutions from a large number of possible solutions. This approach allows schedulers to express detailed constraints between activities and other activities, resources (material and personnel), and requirements that certain states exist for their execution. Our scheduler has already demonstrated its benefit to improving the shuttle processing flow management at Kennedy Space Center. Knowledge-based scheduling techniques should be examined by utilities industry researchers, developers, operators and management for application to utilities planning problems because of its great cost benefit potential. 4 refs., 4 figs

  18. Remote operation and automation of the maintenance works under the radiation field

    International Nuclear Information System (INIS)

    Asai, Takashi; Koga, Akihiko; Shirasu, Isao; Miida, Toshiro

    1983-01-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenence works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today is so difficult to replace with machines due to their deversified and complexed nature. (author)

  19. Expert system for maintenance management of a boiling water reactor power plant

    International Nuclear Information System (INIS)

    Hong Shen; Liou, L.W.; Levine, S.; Ray, A.; Detamore, M.

    1992-01-01

    An expert system code has been developed for the maintenance of two boiling water reactor units in Berwick, Pennsylvania, that are operated by the Pennsylvania Power and Light Company (PP and L). The objective of this expert system code, where the knowledge of experienced operators and engineers is captured and implemented, is to support the decisions regarding which components can be safely and reliably removed from service for maintenance. It can also serve as a query-answering facility for checking the plant system status and for training purposes. The operating and maintenance information of a large number of support systems, which must be available for emergencies and/or in the event of an accident, is stored in the data base of the code. It identifies the relevant technical specifications and management rules for shutting down any one of the systems or removing a component from service to support maintenance. Because of the complexity and time needed to incorporate a large number of systems and their components, the first phase of the expert system develops a prototype code, which includes only the reactor core isolation coolant system, the high-pressure core injection system, the instrument air system, the service water system, and the plant electrical system. The next phase is scheduled to expand the code to include all other systems. This paper summarizes the prototype code and the design concept of the complete expert system code for maintenance management of all plant systems and components

  20. Sensitivity of Risk-Based Maintenance Planning of Offshore Wind Turbine Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    2017-01-01

    Inspection and maintenance expenses cover a considerable part of the cost of energy from offshore wind turbines. Risk-based maintenance planning approaches are a powerful tool to optimize maintenance and inspection actions and decrease the total maintenance expenses. Risk-based planning is based...... on many input parameters, which are in reality often not completely known. This paper will assess the cost impact of this incomplete knowledge based on a case study following risk-based maintenance planning. The sensitivity study focuses on weather forecast uncertainties, incomplete knowledge about...... the needed repair time on the site as well as uncertainties about the operational range of the boat and helicopter used to access the broken wind turbine. The cost saving potential is estimated by running Crude Monte Carlo simulations. Furthermore, corrective and preventive (scheduled and condition...

  1. Maintenance of nuclear chemical and fuel fabrication plants [Invited talk no. IT-3

    International Nuclear Information System (INIS)

    Prasad, A.M.

    1981-01-01

    Though the objective of the maintenance practices followed in nuclear facilities is to optimise production as in other conventional production plants, the radioactivity associated with nuclear materials is a major constraint in all maintenance jobs on equipment of the nuclear facility. Often non-routine maintenance have to be adopted. Maintenance aspect has to be taken into consideration at the design stage of the nuclear facility. The maintenance concept adopted in a nuclear facility depends on the type of plant and varies from full indirect remote maintenance to direct contact maintenance. This is illustrated by discussing maintenance practices followed in a fuel reprocessing plant, a high level radioactive waste management facility, a fuel fabrication plant, and a heavy water plant. Exposure of maintenance staff to radiation has to be kept within limits governed by safety regulations. Along with planning and scheduling of maintenance, training of manpower with mock-up facilities assumes importance and the maintenance jobs must be carried out under strict supervision. (M.G.B.)

  2. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  3. Analyses in support of risk-informed natural gas vehicle maintenance facility codes and standards :

    Energy Technology Data Exchange (ETDEWEB)

    Ekoto, Isaac W.; Blaylock, Myra L.; LaFleur, Angela Christine; LaChance, Jeffrey L.; Horne, Douglas B.

    2014-03-01

    Safety standards development for maintenance facilities of liquid and compressed gas fueled large-scale vehicles is required to ensure proper facility design and operation envelopes. Standard development organizations are utilizing risk-informed concepts to develop natural gas vehicle (NGV) codes and standards so that maintenance facilities meet acceptable risk levels. The present report summarizes Phase I work for existing NGV repair facility code requirements and highlights inconsistencies that need quantitative analysis into their effectiveness. A Hazardous and Operability study was performed to identify key scenarios of interest. Finally, scenario analyses were performed using detailed simulations and modeling to estimate the overpressure hazards from HAZOP defined scenarios. The results from Phase I will be used to identify significant risk contributors at NGV maintenance facilities, and are expected to form the basis for follow-on quantitative risk analysis work to address specific code requirements and identify effective accident prevention and mitigation strategies.

  4. Attentional and non-attentional systems in the maintenance of verbal information in working memory: the executive and phonological loops.

    Science.gov (United States)

    Camos, Valérie; Barrouillet, Pierre

    2014-01-01

    Working memory is the structure devoted to the maintenance of information at short term during concurrent processing activities. In this respect, the question regarding the nature of the mechanisms and systems fulfilling this maintenance function is of particular importance and has received various responses in the recent past. In the time-based resource-sharing (TBRS) model, we suggest that only two systems sustain the maintenance of information at the short term, counteracting the deleterious effect of temporal decay and interference. A non-attentional mechanism of verbal rehearsal, similar to the one described by Baddeley in the phonological loop model, uses language processes to reactivate phonological memory traces. Besides this domain-specific mechanism, an executive loop allows the reconstruction of memory traces through an attention-based mechanism of refreshing. The present paper reviews evidence of the involvement of these two independent systems in the maintenance of verbal memory items.

  5. Attentional and non-attentional systems in the maintenance of verbal information in working memory: the executive and phonological loops

    Science.gov (United States)

    Camos, Valérie; Barrouillet, Pierre

    2014-01-01

    Working memory is the structure devoted to the maintenance of information at short term during concurrent processing activities. In this respect, the question regarding the nature of the mechanisms and systems fulfilling this maintenance function is of particular importance and has received various responses in the recent past. In the time-based resource-sharing (TBRS) model, we suggest that only two systems sustain the maintenance of information at the short term, counteracting the deleterious effect of temporal decay and interference. A non-attentional mechanism of verbal rehearsal, similar to the one described by Baddeley in the phonological loop model, uses language processes to reactivate phonological memory traces. Besides this domain-specific mechanism, an executive loop allows the reconstruction of memory traces through an attention-based mechanism of refreshing. The present paper reviews evidence of the involvement of these two independent systems in the maintenance of verbal memory items. PMID:25426049

  6. Attentional and non-attentional systems in the maintenance of verbal information in working memory: the executive and phonological loops.

    Directory of Open Access Journals (Sweden)

    Valerie eCamos

    2014-11-01

    Full Text Available Working memory is the structure devoted to the maintenance of information at short term during concurrent processing activities. In this respect, the question regarding the nature of the mechanisms and systems fulfilling this maintenance function is of particular importance and has received various responses in the recent past. In the time-based resource-sharing model, we suggest that only two systems sustain the maintenance of information at the short term, counteracting the deleterious effect of temporal decay and interference. A non-attentional mechanism of verbal rehearsal, similar to the one described by Baddeley in the phonological loop model, uses language processes to reactivate phonological memory traces. Besides this domain-specific mechanism, an executive loop allows the reconstruction of memory traces through an attention-based mechanism of refreshing. The present paper reviews evidence of the involvement of these two independent systems in the maintenance of verbal memory items.

  7. 12 CFR 404.9 - Schedule of fees.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Schedule of fees. 404.9 Section 404.9 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES INFORMATION DISCLOSURE Procedures for Disclosure of Records Under the Freedom of Information Act. § 404.9 Schedule of fees. (a) General. Ex-Im Bank shall...

  8. Maintenance and manipulation of information in schizophrenia: further evidence for impairment in the central executive component of working memory.

    Science.gov (United States)

    Kim, Junghoon; Glahn, David C; Nuechterlein, Keith H; Cannon, Tyrone D

    2004-06-01

    Impairments in working memory (WM) have been proposed to underlie various cognitive and functional impairments in schizophrenia. However, the nature and extent of the dysfunction remain unclear. The present study attempted to examine the integrity of sub-components of working memory in schizophrenia within the framework of the multiple-component working memory model proposed by Baddeley. Two sets of visuospatial and verbal delayed-response tasks were developed which had comparable formats and difficulties across domains. In Experiment 1, demands on the central executive (CE) were manipulated by requiring subjects either (1) to simultaneously maintain and transform information (maintenance-and-manipulation condition) or (2) just to maintain this information (maintenance-only condition). In Experiment 2, the amount of information to be maintained over the delay was parametrically varied to evaluate demands on the temporary maintenance component of working memory. Patients (N=16) performed worse than controls (N=16) in both conditions of Experiment 1; however, simultaneous maintenance and manipulation was associated with a significantly greater performance reduction in the patients. In Experiment 2, both patients (N=15) and controls (N=15) declined in performance, at equivalent rates, with increasing memory load. Parallel findings were observed for the verbal and visuospatial tasks. These results suggest that while both maintenance and central executive aspects of working memory are impaired in schizophrenic patients, the central executive may be more severely affected.

  9. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Migaud, D.; Hutin, J.P.; Jouette, I.; Eymond, P.; Devie, P.; Cudelou, C.; Magnier, S.; Frydman, M.

    2016-01-01

    This document gathers different articles concerning the maintenance of the French nuclear power plants. The first article analyses the impact of the recent law on the energetic transition that sets the share of nuclear power at 50% of the electricity produced by 2025. A consequence may be the decommissioning of 17 to 20 reactors by 2025 and the huge maintenance program called 'Grand Carenage' whose aim is to extend operating life over 40 years will have to be re-considered in order to avoid useless expenses. The second article shows that in 2015 the French nuclear reactor fleet got very good results in terms of availability and safety. There were 49 scheduled outages and among them some ended ahead of time. The third article describes the specificities of the maintenance of a nuclear power plant, for instance the redundancy of some systems implies that maintenance has to deal with systems that have never functioned but must be ready to operate at any moment. Another specificity is the complexity of a nuclear power plant that implies an essential phase of preparation for maintenance operations. Because of safety requirements any maintenance operation has to be controlled, checked and may provide feedback. The fourth article presents the 'Grand Carenage' maintenance program that involves the following operations: the replacement of steam generators, the re-tubing of condensers, the replacement of the filtering drums used for cooling water, the testing of the reactor building, the hydraulic test of the primary circuit and the inspection of the reactor vessel. The fifth article focuses on the organization of the work-site for maintenance operations and the example of the Belleville-sur-Loire is described in the sixth article. Important maintenance operations like 'Grand Carenage' requires a strong collaboration with a network of specialized enterprises and as no reactor (except Flamanville EPR) is being built in France, maintenance

  10. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  11. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance

  12. Examples of in-service inspections and typical maintenance schedule for low-power research reactors

    International Nuclear Information System (INIS)

    Boeck, H.

    1997-01-01

    In-service inspection methods for low-power research reactors are described which have been developed during the past 37 years of the operation of the TRIGA reactor Vienna. Special tools have been developed during this period and their application for maintenance and in-serve inspection is discussed. Two practical in-service inspections at a TRIGA reactor and at a MTR reactor are presented. Further a typical maintenance plan for a TRIGA reactor is listed in the annex. (author)

  13. Preventive maintenance technology for nuclear power stations

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo

    1992-01-01

    With the increase of the number of nuclear power plants in operation and the number of years of operation, the improvement of reliability and the continuation of safe operation have become more important, and the expectation for preventive maintenance technology has also heightened. The maintenance of Japanese nuclear power plants is based on the time schedule maintenance mainly by the regular inspection carried out every year, but the monitoring of the conditions of various machinery and equipment in operation has been performed widely. In this report, the present state of checkup and inspection technologies and the monitoring and diagnostic technologies for operational condition, which are the key technologies of preventive maintenance, are described. As the checkup and inspection technologies, ultrasonic flow detection technology, phased array technology, Amplituden und Laufzeit Orts Kurven method and X-ray CT, and as the monitoring and diagnostic technologies for operational condition, the diagnosis support system for BWR plants 'PLADIS', those for rotary machines, those for turbogenerators, those for solenoid valves, the mechanization of patrol works and the systematizing technology are reported. (K.I.)

  14. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    Directory of Open Access Journals (Sweden)

    Xuejuan Liu

    2017-07-01

    Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  15. Asphalt in Pavement Maintenance.

    Science.gov (United States)

    Asphalt Inst., College Park, MD.

    Maintenance methods that can be used equally well in all regions of the country have been developed for the use of asphalt in pavement maintenance. Specific information covering methods, equipment and terminology that applies to the use of asphalt in the maintenance of all types of pavement structures, including shoulders, is provided. In many…

  16. PLACEMENT APPLICATIONS SCHEDULING LECTURE IN INTERNATIONAL PROGRAM UNIKOM BASED ANDROID

    Directory of Open Access Journals (Sweden)

    Andri Sahata Sitanggang

    2017-12-01

    Full Text Available One who determines life of a classroom namely mapping scheduling courses especially at college. The process scheduling has included time or schedule of a class of available, room available, lecture who is scheduled for, and schedule for lecturer going to teach. Hopefully with a scheduling it will facilitate the students and teachers in obtaining information lecture schedule. With the emergence of the android application ( is implanted in mobile phones , the public can now use the internet so fast that is based .So with that researchers give one a technology based solutions to build android application .This is because one of the technology has given the functions which may make it easier for students and university lecturers in terms of access to information. In building this application used method of the prototype consisting 2 access namely access user and admin , where module user consisting of modules register , login , scheduling module , while for admin given module login , register and arrangement information scheduling courses both the administration and lecturers .Application made will be integrated with internet so that this program is real-time application.

  17. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    International Nuclear Information System (INIS)

    Hendrickson, D.W.

    1995-01-01

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences

  18. Training and information

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    The Training and Information Division provides centralized direction and coordination for the training and information activities of the Center for Energy and Environment Research (formerly Puerto Rico Nuclear Center). The Division Head serves as Educational Officer, Technical Information Officer, and Public Information Officer. Training responsibilities include registering students; maintaining centralized records on training activities; preparing reports for ERDA; scheduling the utilization of training facilities; providing audiovisual equipment; assisting in the preparation of courses, seminars, symposia, and meetings; administering fellowship programs; and providing personal assistance to students in matters such as housing and immigration. The Division Head represents the Director on the Admissions Committee. Information responsibilities include preparation of manuscripts for ERDA patent clearance and publication release, maintenance of central files on all manuscripts and publications, preparation of the Annual Report, providing editorial and translation assistance, operation of a Technical Reading Room, operation of an ERDA Film Library, operation of a Reproduction Shop, providing copying services, and assisting visitors

  19. 76 FR 28194 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2011-05-16

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  20. 75 FR 27228 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2010-05-14

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY... publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from... on the proposed fee schedule should be mailed or delivered to the Office of the General Counsel...

  1. Integrated management of information inside maintenance processes. From the building registry to BIM systems

    Directory of Open Access Journals (Sweden)

    Cinzia Talamo

    2014-10-01

    Full Text Available The paper presents objec- tives, methods and results of two researches dealing with the improvement of integrated information management within maintenance processes. Focusing on information needs regarding the last phases of the building process, the two researches draft approaches characterizing a path of progressive improve- ment of strategies for integration: from a building registry, unique for the whole construction process, to an integrated management of the building process with the support of BIM systems.

  2. 40 CFR 94.211 - Emission-related maintenance instructions for purchasers.

    Science.gov (United States)

    2010-07-01

    ... agreement) which is identified by brand, trade, or corporate name. Such instructions also will not directly... whose function is not integral to the design and performance of the engine). (f) Scheduled maintenance... significantly degrade emission control and whose function is not integral to the design and performance of the...

  3. A methodology based in particle swarm optimization algorithm for preventive maintenance focused in reliability and cost

    International Nuclear Information System (INIS)

    Luz, Andre Ferreira da

    2009-01-01

    In this work, a Particle Swarm Optimization Algorithm (PSO) is developed for preventive maintenance optimization. The proposed methodology, which allows the use flexible intervals between maintenance interventions, instead of considering fixed periods (as usual), allows a better adaptation of scheduling in order to deal with the failure rates of components under aging. Moreover, because of this flexibility, the planning of preventive maintenance becomes a difficult task. Motivated by the fact that the PSO has proved to be very competitive compared to other optimization tools, this work investigates the use of PSO as an alternative tool of optimization. Considering that PSO works in a real and continuous space, it is a challenge to use it for discrete optimization, in which scheduling may comprise variable number of maintenance interventions. The PSO model developed in this work overcome such difficulty. The proposed PSO searches for the best policy for maintaining and considers several aspects, such as: probability of needing repair (corrective maintenance), the cost of such repairs, typical outage times, costs of preventive maintenance, the impact of maintaining the reliability of systems as a whole, and the probability of imperfect maintenance. To evaluate the proposed methodology, we investigate an electro-mechanical system consisting of three pumps and four valves, High Pressure Injection System (HPIS) of a PWR. Results show that PSO is quite efficient in finding the optimum preventive maintenance policies for the HPIS. (author)

  4. A Market-Based Approach to Multi-factory Scheduling

    Science.gov (United States)

    Vytelingum, Perukrishnen; Rogers, Alex; MacBeth, Douglas K.; Dutta, Partha; Stranjak, Armin; Jennings, Nicholas R.

    In this paper, we report on the design of a novel market-based approach for decentralised scheduling across multiple factories. Specifically, because of the limitations of scheduling in a centralised manner - which requires a center to have complete and perfect information for optimality and the truthful revelation of potentially commercially private preferences to that center - we advocate an informationally decentralised approach that is both agile and dynamic. In particular, this work adopts a market-based approach for decentralised scheduling by considering the different stakeholders representing different factories as self-interested, profit-motivated economic agents that trade resources for the scheduling of jobs. The overall schedule of these jobs is then an emergent behaviour of the strategic interaction of these trading agents bidding for resources in a market based on limited information and their own preferences. Using a simple (zero-intelligence) bidding strategy, we empirically demonstrate that our market-based approach achieves a lower bound efficiency of 84%. This represents a trade-off between a reasonable level of efficiency (compared to a centralised approach) and the desirable benefits of a decentralised solution.

  5. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  6. Flexible Scheduling May Have a Positive Impact on School Library Circulation. A Review of: Gavigan, K., Pribesh, S., & Dickinson, G. (2010. Fixed or flexible schedule? Schedule impacts and school library circulation. Library and Information Science Research, 32(2, 131-37.

    Directory of Open Access Journals (Sweden)

    Ann Medaille

    2011-03-01

    Full Text Available Objective – To determine whether a significant, positive relationship exists between flexible scheduling in elementary school library media centers and per-pupil circulation statistics.Design – Online survey.Setting – Library media centers in public elementary schools in two states of the United States.Subjects – A total of 88 elementary school library media specialists completed the survey.Methods – A 22-question online survey was created using Inquisite software. A link to the survey was sent via e-mail to a 600-person random sample of public school library media specialists whose names were drawn from the memberships of the North Carolina School Library Media Association and the Virginia Educational Media Association, with combined memberships totalling approximately 2,000. A random sample of 600 was chosen to provide a 95% confidence level with a confidence interval of plus or minus three points. The survey included questions about school schedules (flexible, partially flexible, or fixed, collection size, circulation statistics, total student enrolment, school type (elementary, middle, or high, school location (urban, rural, or suburban, percentage of students eligible for free and reduced price lunch, numbers of full-time professional library media specialists employed at the school, access procedures, and library closure information. The survey response rate was 29.3% (176 respondents. Because fixed versus flexible scheduling is an issue that primarily affects elementary schools, the authors further narrowed their subject pool to 88 elementary school respondents. Data were analyzed using SPSS 16.0 statistical software. Correlation analysis, including the analysis of covariance (ANCOVA, was used to compare differences in the three scheduling types and to control for other variables (such as location, socioeconomic status, collection size, staffing, days closed, and others that may affect circulation.Main Results – Of the 88

  7. Using Improved Ant Colony Algorithm to Investigate EMU Circulation Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Yu Zhou

    2014-01-01

    Full Text Available High-speed railway is one of the most important ways to solve the long-standing travel difficulty problem in China. However, due to the high acquisition and maintenance cost, it is impossible for decision-making departments to purchase enough EMUs to satisfy the explosive travel demand. Therefore, there is an urgent need to study how to utilize EMU more efficiently and reduce costs in the case of completing a given task in train diagram. In this paper, an EMU circulation scheduling model is built based on train diagram constraints, maintenance constraints, and so forth; in the model solving process, an improved ACA algorithm has been designed. A case study is conducted to verify the feasibility of the model. Moreover, contrast tests have been carried out to compare the efficiency between the improved ACA and the traditional approaches. The results reveal that improved ACA method can solve the model with less time and the quality of each representative index is much better, which means that efficiency of the improved ACA method is higher and better scheduling scheme can be obtained.

  8. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  9. Predictive maintenance primer

    International Nuclear Information System (INIS)

    Flude, J.W.; Nicholas, J.R.

    1991-04-01

    This Predictive Maintenance Primer provides utility plant personnel with a single-source reference to predictive maintenance analysis methods and technologies used successfully by utilities and other industries. It is intended to be a ready reference to personnel considering starting, expanding or improving a predictive maintenance program. This Primer includes a discussion of various analysis methods and how they overlap and interrelate. Additionally, eighteen predictive maintenance technologies are discussed in sufficient detail for the user to evaluate the potential of each technology for specific applications. This document is designed to allow inclusion of additional technologies in the future. To gather the information necessary to create this initial Primer the Nuclear Maintenance Applications Center (NMAC) collected experience data from eighteen utilities plus other industry and government sources. NMAC also contacted equipment manufacturers for information pertaining to equipment utilization, maintenance, and technical specifications. The Primer includes a discussion of six methods used by analysts to study predictive maintenance data. These are: trend analysis; pattern recognition; correlation; test against limits or ranges; relative comparison data; and statistical process analysis. Following the analysis methods discussions are detailed descriptions for eighteen technologies analysts have found useful for predictive maintenance programs at power plants and other industrial facilities. Each technology subchapter has a description of the operating principles involved in the technology, a listing of plant equipment where the technology can be applied, and a general description of the monitoring equipment. Additionally, these descriptions include a discussion of results obtained from actual equipment users and preferred analysis techniques to be used on data obtained from the technology. 5 refs., 30 figs

  10. Scheduling at the Los Alamos Neutron Science Center (LANSCE)

    International Nuclear Information System (INIS)

    Gallegos, F.R.

    1999-01-01

    The centerpieces of the Los Alamos Neutron Science Center (LANSCE) are a half-mile long 800-MeV proton linear accelerator and proton storage ring. The accelerator, storage ring, and target stations provide the protons and spallation neutrons that are used in the numerous basic research and applications experimental programs supported by the US Department of Energy. Experimental users, facility maintenance personnel, and operations personnel must work together to achieve the most program benefit within defined budget and resource constraints. In order to satisfy the experimental users programs, operations must provide reliable and high quality beam delivery. Effective and efficient scheduling is a critical component to achieve this goal. This paper will detail how operations scheduling is presently executed at the LANSCE accelerator facility

  11. Centralized mission planning and scheduling system for the Landsat Data Continuity Mission

    Science.gov (United States)

    Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki

    2014-01-01

    Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.

  12. Challenges encountered during an accelerated cogeneration plant construction and commissioning schedule

    International Nuclear Information System (INIS)

    Good, R.L.; Cox, T.P.; Vallejo, J.M.

    1988-01-01

    A decision was made in 1986 to proceed with a 110 magawatt grassroots cogeneration plant to supply the steam and electrical requirements of a large, integrated petrochemical manufacturing facility. Though some preliminary engineering had been done and long delivery equipment purchase orders had been let in the summer of 1986, detailed engineering did not commence until late October and construction until mid-December, 1986. Federal income tax consideration required that the project be in service prior to the end of 1987. This eleven month construction, commissioning, and start up schedule was achieved with 100 per cent operation occurring on December 22, 1987. Numerous challenges were met by the lean Project Team during this accelerated schedule. This paper discusses the development of: Project Team Staffing, Operator and Maintenance Staffing and Training, Commissioning Schedules and Staffing, solutions to Significant Technical Problems

  13. Maintenance and control of apparatus for radiotherapy

    International Nuclear Information System (INIS)

    Wakui, Sho

    1979-01-01

    In order to perform the safe operation of radiotherapy apparatuses and to secure the accuracy in positioning patients and in setting up radiation beam, proper checking-up and maintenance schedule is necessary. Such schedule is described briefly and also the mechanical or electrical equipments designed for securing the safety and accuracy or eliminating in adequate operation are explained, especially on treatment tables and accessories, such as wedge filters, irradiation field indicators and pointers, and the devices for observing patients. The structures and the practical control of the following equipments are explained; standard treatment table, treatment table with a lifting column by oil pressure, mobile positioning control pedestal, positioning control pendaut, mechanical fuse cutter for the safeguard of table height movement, safety interlock to protect table from physical contact with radiation head in rotation and safeguard for arms of a patient in longitudinal movement of treatment table. For the maintenance and control of wedge filters, the kind of filter angle in use, the direction of filter in use and whether filter is used or not are exactly confirmed by adequate display. The direction mechanism of radiation field and the pointers are required to be strict for exact focusing of radiation. Various control apparatuses and monitoring apparatuses are described. (Kobatake, H.)

  14. 75 FR 4099 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-06] Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional Classification and Wage Rate AGENCY: Office of... proposal. The information is used by HUD to determine or adopt prevailing wage rates for maintenance...

  15. 75 FR 37457 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Science.gov (United States)

    2010-06-29

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-54] Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional Classification and Wage Rate AGENCY: Office of... proposal. The information is used by HUD to determine or adopt prevailing wage rates for maintenance...

  16. Information Management System Development for the Investigation, Reporting, and Analysis of Human Error in Naval Aviation Maintenance

    National Research Council Canada - National Science Library

    Nelson, Douglas

    2001-01-01

    The purpose of this research is to evaluate and refine a safety information management system that will facilitate data collection, organization, query, analysis and reporting of maintenance errors...

  17. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  18. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  19. An Improved Multiobjective PSO for the Scheduling Problem of Panel Block Construction

    Directory of Open Access Journals (Sweden)

    Zhi Yang

    2016-01-01

    Full Text Available Uncertainty is common in ship construction. However, few studies have focused on scheduling problems under uncertainty in shipbuilding. This paper formulates the scheduling problem of panel block construction as a multiobjective fuzzy flow shop scheduling problem (FSSP with a fuzzy processing time, a fuzzy due date, and the just-in-time (JIT concept. An improved multiobjective particle swarm optimization called MOPSO-M is developed to solve the scheduling problem. MOPSO-M utilizes a ranked-order-value rule to convert the continuous position of particles into the discrete permutations of jobs, and an available mapping is employed to obtain the precedence-based permutation of the jobs. In addition, to improve the performance of MOPSO-M, archive maintenance is combined with global best position selection, and mutation and a velocity constriction mechanism are introduced into the algorithm. The feasibility and effectiveness of MOPSO-M are assessed in comparison with general MOPSO and nondominated sorting genetic algorithm-II (NSGA-II.

  20. Azithromycin maintenance therapy in patients with cystic fibrosis : A dose advice based on a review of pharmacokinetics, efficacy, and side effects

    NARCIS (Netherlands)

    Wilms, Erik B.; Touw, Daniel J.; Heijerman, Harry G.M.; Van Der Ent, Cornelis K.

    Azithromycin maintenance therapy results in improvement of respiratory function in patients with cystic fibrosis (CF). In azithromycin maintenance therapy, several dosing schemes are applied. In this review, we combine current knowledge about azithromycin pharmacokinetics with the dosing schedules

  1. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  2. Maintenance manual. Vol. 1. Maintenance management; 2. completely rev. ed.; Handbuch Instandhaltung. Bd. 1. Instandhaltungsmanagement

    Energy Technology Data Exchange (ETDEWEB)

    Warnecke, H.J. [ed.] [Fraunhofer-Institut fuer Produktionstechnik und Automatisierung (IPA), Stuttgart (Germany)

    1992-12-31

    This manual is the second, completely revised edition of the standard manual ``Maintenance - Fundamentals``, which was first published in 1981. It presents an outline of all relevant fields of maintenance today and contains practical information on new and established methods of maintenance management and technology. With its comprehensive concept, which addresses any industrial enterprise that wants to remain competitive, the manual is indispensable for maintenance managers in industry, service enterprises and consultancies. Vol.1, ``Maintenance Management``, informs the reader on fundamentals, design with a view to maintenance, organisation of maintenance work, personnel management, industrial safety and economic aspects of maintenance. Current issues such as product liability, electronic data processing, expert systems, environmental protection, controlling based on characteristic data, etc. are gone into. Graphical representations, concrete procedural information and exemplary solutions may be used directly as working tools for the practice of maintenance. (orig.) [Deutsch] Das vorliegende Handbuch ist die zweite, voellig ueberarbeitete und erweiterte Auflage des Standardwerkes ``Instandhaltung - Grundlagen``, das 1981 erstmals erschien. Es gibt einen Ueberblick ueber alle relevanten Gebiete einer modernen Instandhaltung und vermittelt praxisnahes Wissen ueber neue und bewaehrte Methoden und Verfahren des Instandhaltungsmanagements und der Instandhaltungstechnik. Mit dieser umfassenden Konzeption, die auf die Belange des im Wettbewerb stehenden Industriebetriebes ausgerichtet ist, wendet sich das Handbuch an die Fuehrungskraefte der Instandhaltung in der Industrie sowie an Dienstleistungs- und Beratungsunternehmen. Im Band 1 ``Instandhaltungsmanagement`` kann sich der Leser ueber Grundlagen, instandhaltungsgerechtes Konstruieren, Organisation der Instandhaltung, Personalmanagement, Arbeitssicherheit sowie Wirtschaftlichkeit der Instandhaltung informieren

  3. In-cell maintenance by manipulator arm with 3D workspace information recreated by laser rangefinder

    International Nuclear Information System (INIS)

    Kitamura, Akihiro; Nakai, Koji; Namekawa, Takashi; Watahiki, Masatoshi

    2011-01-01

    Highlights: → We developed a remote control system for maintenance of in-cell type fuel fabrication equipment. → The system display recreated three-dimensional information of the workspace from data obtained by laser rangefinder and conventional cameras. It has allowed us to operate a manipulator arm remotely with several control modes. → We implemented remote handling experiments using mock up equipment. Performance was compared for remote operation conducted using several different display and operation modes. → It was observed that integration of 3D information from the laser rangefinder reduced operation time and reinforced visual information during remote operation. - Abstract: We developed a remote control system for maintenance of in-cell type fuel fabrication equipment. The system display recreated three-dimensional information of the workspace from data obtained by laser rangefinder and conventional cameras. It has allowed us to operate a manipulator arm remotely with several control modes. In order to evaluate the effectiveness and usefulness of developed system, we implemented remote handling experiments using mock up equipment. Performance was compared for remote operation conducted using several different display and operation modes. We confirmed that the system is able to maintain in-cell fuel fabrication equipment in each display and operation mode. Times required to complete the remote operations were collected and compared in each mode. It was observed that integration of 3D information from the laser rangefinder reduced operation time and reinforced visual information during remote operation.

  4. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  5. Software evolution and maintenance

    CERN Document Server

    Tripathy, Priyadarshi

    2014-01-01

    Software Evolution and Maintenance: A Practitioner's Approach is an accessible textbook for students and professionals, which collates the advances in software development and provides the most current models and techniques in maintenance.Explains two maintenance standards: IEEE/EIA 1219 and ISO/IEC14764Discusses several commercial reverse and domain engineering toolkitsSlides for instructors are available onlineInformation is based on the IEEE SWEBOK (Software Engineering Body of Knowledge)

  6. Implementing a least cost and risk focused maintenance process

    International Nuclear Information System (INIS)

    Darling, S.S.

    1996-01-01

    The paper will focus on the vital role maintenance, big ''M'' (spares, PM program, planning and scheduling, turning the wrench), has in preserving return of investment, and safety in operation of high risk high value facilities/platforms. The maintenance process of today and for the future must utilize risk assessment and reliability engineering techniques to prioritize plant resources. The new process must provide for high levels of safety assurance yet allow for improved generation and transmission capacity while maintaining adequate system reliability. This approach ultimately leads to continuous and sustained reduction in operating cost, improved production capacity, and a safety culture based upon a risk determent cost-beneficial decision process

  7. New remote maintenance approach for TPX

    International Nuclear Information System (INIS)

    Davis, F.C.; Walker, M.S.; Brown, T.G.

    1993-01-01

    The Tokamak Physics Experiment (TPX), to be located at Princeton Plasma Physics Laboratory, will be a steady-state, high-performance fusion machine. It will use hydrogen fuel during its original operation, deuterium-deuterium (D-D) fuel for an extended intermediate period of time and then a limited number of runs using deuterium-tritium (D-T) fuel. The D-D operations wig generate neutron fluxes that will activate materials of the vacuum vessel. From that point on, the resulting ionizing radiation, which will continue to increase, particularly during D-T operation, will prevent personnel access into the vessel to perform either scheduled or unscheduled maintenance activities. All activities performed within the vacuum vessel must be accomplished using remote means. TPX has taken a new approach for remote maintenance of the components within the vacuum vessel. This document describes the system that is being developed

  8. Using heuristic search for optimizing maintenance plans

    International Nuclear Information System (INIS)

    Mutanen, Teemu

    2012-01-01

    This work addresses the maintenance action selection process. Maintenance personnel need to evaluate maintenance actions and costs to keep the machines in working condition. Group of actions are evaluated together as maintenance plans. The maintenance plans as output provide information to the user about which actions to take if any and what future actions should be prepared for. The heuristic search method is implemented as part of general use toolbox for analysis of measurements from movable work machines. Impacts from machine's usage restrictions and maintenance activities are analysed. The results show that once put on a temporal perspective, the prioritized order of the actions is different and provide additional information to the user.

  9. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  10. Comparison of Strategies for Signaling of Scheduling Assignments in Wireless OFDMA

    OpenAIRE

    Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niclas; Frenger, Pål; Gunnarsson, Fredrik

    2010-01-01

    This paper considers transmission of scheduling information in  OFDMA-based cellular communication systems such as 3GPP long-term  evolution (LTE). These systems provide efficient usage of radio  resources by allowing users to be scheduled dynamically in both  frequency and time. This requires considerable amounts of scheduling  information to be sent to the users.  The paper compares two basic transmission strategies: transmitting a  separate scheduling message to each user versus broadcasti...

  11. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  12. Proceedings of the CIM maintenance engineering/mine operators' conference; Comptes rendus du colloque de ICM sur l'ingenierie de maintenance et l'exploitation miniere

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This conference provided a forum to exchange knowledge and best practices that apply to to modern underground mining. It highlighted the synergy and co-operation that is essential for successful operations and maintenance practices. Solutions to mitigate increasing ventilation costs were presented along with possible alternatives to diesel powered equipment in order to maintain air quality at a level that is acceptable for human workers. The themes for the technical program were innovation and performance improvement; maintenance, and mining. The sessions were entitled: deep mining; environment; mining best practices; ground control; energy efficiency; research and development in mining; mining methods; narrow-vein mining; innovative equipment; predictive maintenance; research and development in maintenance; and, planning and scheduling. The conference featured 24 presentations, of which 5 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  13. Selecting Suitable Candidates for Predictive Maintenance

    NARCIS (Netherlands)

    Tiddens, Wieger Willem; Braaksma, Anne Johannes Jan; Tinga, Tiedo

    2018-01-01

    Predictive maintenance (PdM) or Prognostics and Health Management (PHM) assists in better predicting the future state of physical assets and making timely and better-informed maintenance decisions. Many companies nowadays ambition the implementation of such an advanced maintenance policy. However,

  14. Optimal scheduling of biocide dosing for seawater-cooled power and desalination plants

    KAUST Repository

    Mahfouz, Abdullah Bin

    2011-02-13

    Thermal desalination systems are typically integrated with power plants to exploit the excess heat resulting from the power-generation units. Using seawater in cooling the power plant and the desalination system is a common practice in many parts of the world where there is a shortage of freshwater. Biofouling is one of the major problems associated with the usage of seawater in cooling systems. Because of the dynamic variation in the power and water demands as well as the changes in the characteristics of seawater and the process, there is a need to develop an optimal policy for scheduling biocide usage and cleaning maintenance of the heat exchangers. The objective of this article is to introduce a systematic procedure for the optimization of scheduling the dosing of biocide and dechlorination chemicals as well as cleaning maintenance for a power production/thermal desalination plant. A multi-period optimization formulation is developed and solved to determine: the optimal levels of dosing and dechlorination chemicals; the timing of maintenance to clean the heat-exchange surfaces; and the dynamic dependence of the biofilm growth on the applied doses, the seawater-biocide chemistry, the process conditions, and seawater characteristics for each time period. The technical, economic, and environmental considerations of the system are accounted for. A case study is solved to elucidate the applicability of the developed optimization approach. © 2011 Springer-Verlag.

  15. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Lashgari, Farbod.

    1995-01-01

    This paper is about maintenance of nuclear power plants. In part one, the outage management of nuclear power plants has described. Meaning of the outage and objectives of outage management is given in introduction. The necessity of a long-term outage strategy is shown in chapter one. The main parts of an outage are as follows: Planning; Preparation; Execution, Each of them and also post-outage review have been explained in the followed chapters. Part two deals with technical details of main primary components of nuclear power plant type WWER. After an introduction about WWER reactors, in each chapter first the general and detailed description of main primary components has given and then their maintenance schedules and procedures. Chapter about reactor and steam generator is related to both types of WWER-440 and WWER-1000, but chapter about reactor coolant pump has specified to WWER-1000 to be more in details.(author)

  16. Flexibility within working memory and the focus of attention for sequential verbal information does not depend on active maintenance.

    Science.gov (United States)

    Sandry, Joshua; Schwark, Jeremy D; MacDonald, Justin

    2014-10-01

    The focus of attention seems to be a static element within working memory when verbal information is serially presented, unless additional time is available for processing or active maintenance. Experiment 1 manipulated the reward associated with early and medial list positions in a probe recognition paradigm and found evidence that these nonterminal list positions could be retrieved faster and more accurately if participants were appropriately motivated-without additional time for processing or active maintenance. Experiment 2 used articulatory suppression and demonstrated that the underlying maintenance mechanism cannot be attributed to rehearsal, leaving attentional refreshing as the more likely mechanism. These findings suggest that the focus of attention within working memory can flexibly maintain nonterminal early and medial list representations at the expense of other list representations even when there is not additional time for processing or active maintenance. Maintenance seems to be accomplished through an attentional refreshing mechanism.

  17. 40 CFR 86.1862-04 - Maintenance of records and submittal of information relevant to compliance with fleet average NOX...

    Science.gov (United States)

    2010-07-01

    ... of information relevant to compliance with fleet average NOX standards. 86.1862-04 Section 86.1862-04...-Cycle Heavy-Duty Vehicles § 86.1862-04 Maintenance of records and submittal of information relevant to..., maintain, and retain the following information in adequately organized and indexed records for each model...

  18. Maintenance-based prognostics of nuclear plant equipment for long-term operation

    Energy Technology Data Exchange (ETDEWEB)

    Welz, Zachary; Coble, Jamie; Upadhyaya, Belle; Hines, Wes [University of Tennessee, Knoxville (United States)

    2017-08-15

    While industry understands the importance of keeping equipment operational and well maintained, the importance of tracking maintenance information in reliability models is often overlooked. Prognostic models can be used to predict the failure times of critical equipment, but more often than not, these models assume that all maintenance actions are the same or do not consider maintenance at all. This study investigates the influence of integrating maintenance information on prognostic model prediction accuracy. By incorporating maintenance information to develop maintenance-dependent prognostic models, prediction accuracy was improved by more than 40% compared with traditional maintenance-independent models. This study acts as a proof of concept, showing the importance of utilizing maintenance information in modern prognostics for industrial equipment.

  19. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  20. Evaluation of dose reduction versus standard dosing for maintenance of remission in patients with spondyloarthritis and clinical remission with anti-TNF (REDES-TNF): study protocol for a randomized controlled trial.

    Science.gov (United States)

    Pontes, Caridad; Gratacós, Jordi; Torres, Ferran; Avendaño, Cristina; Sanz, Jesús; Vallano, Antoni; Juanola, Xavier; de Miguel, Eugenio; Sanmartí, Raimon; Calvo, Gonzalo

    2015-08-20

    Dose reduction schedules of tumor necrosis factor antagonists (anti-TNF) as maintenance therapy in patients with spondyloarthritis are used empirically in clinical practice, despite the lack of clinical trials providing evidence for this practice. To address this issue the Spanish Society of Rheumatology (SER) and Spanish Society of Clinical Pharmacology (SEFC) designed a 3-year multicenter, randomized, open-label, controlled clinical trial (2 years for inclusion and 1 year of follow-up). The study is expected to include 190 patients with axial spondyloarthritis on stable maintenance treatment (≥4 months) with any anti-TNF agent at doses recommended in the summary of product characteristics. Patients will be randomized to either a dose reduction arm or maintenance of the dosing regimen as per the official labelling recommendations. Randomization will be stratified according to the anti-TNF agent received before study inclusion. Patient follow-up, visit schedule, and examinations will be maintained as per normal clinical practice recommendations according to SER guidelines. The study aims to test the hypothesis of noninferiority of the dose reduction strategy compared with standard treatment. The first patients were recruited in July 2012, and study completion is scheduled for the end of April 2015. The REDES-TNF study is a pragmatic clinical trial that aims to provide evidence to support a medical decision now made empirically. The study results may help inform clinical decisions relevant to both patients and healthcare decision makers. EudraCT 2011-005871-18 (21 December 2011).

  1. Joint opportunistic scheduling and network coding for bidirectional relay channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-07-01

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users\\' transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited. © 2013 IEEE.

  2. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  3. The role of information in a lifetime process - a model of weight maintenance by women over long time periods

    Directory of Open Access Journals (Sweden)

    Judit Bar-Ilan

    2006-01-01

    Full Text Available Introduction. This paper proposes a model of information behaviour of women during their life-long struggle to maintain normal weight. Method. The model is integrative and contextual, built on existing models in information science and several other disciplines, and the life stories of about fifty Israeli women aged 25-55 and interviews with professionals. Analysis. The life stories of the participating women were analyzed qualitatively, major themes and phases were identified. Results. Weight loss and/or maintenance behaviour is a lifetime process in which distinctive stages were identified. In most cases the weight gain - weight loss - maintenance cycle is a recurring cycle. Information is a major resource during the process: several roles of information were defined: enabling, motivating, reinforcing, providing background information related to weight problems and creating the internal cognitive schema related to food and weight. Information behaviour and the roles of information vary with the different stages. Information needs are also influenced by the specific stage of the process. Information gathered at previous cycles is reused, and information gained through previous experience effects behaviour in the current cycle. Conclusion. The model has both theoretical and practical implications.

  4. Maintenance of nuclear medicine instruments

    Energy Technology Data Exchange (ETDEWEB)

    Ambro, P

    1993-12-31

    Maintenance of instruments is generally of two kinds: (a) corrective maintenance, on a non-scheduled basis, to restore equipment to a functional status by repairs; (b) preventive maintenance, to keep equipment in a specified functional condition by providing systematic inspection, quality control, detection and correction of early malfunctions. Most of the instruments used in nuclear medicine are rather complex systems built from mechanical, electrical and electronic parts. Any one of these components is liable to fail at some time or other. Repair could be done only by a specialist who is able to evaluate the condition of the various parts ranging from cables to connectors, from scintillators to photomultipliers, from microprocessors to microswitches. The knowledge of the intricacies of the various electronic components required for their repairs is quite wide and varied. The electronics industry turns out more and more multi-purpose chips which can carry out the functions of many parts used in the instruments of the earlier generation. This provides protection against unauthorized copying of the circuits but it serves another purpose as well of inhibiting repairs by non-factory personnel. These trends of the instrument design should be taken into consideration when a policy has to be developed for the repairs of the hospital based equipment 1 fig., 1 tab

  5. Maintenance of nuclear medicine instruments

    International Nuclear Information System (INIS)

    Ambro, P.

    1992-01-01

    Maintenance of instruments is generally of two kinds: (a) corrective maintenance, on a non-scheduled basis, to restore equipment to a functional status by repairs; (b) preventive maintenance, to keep equipment in a specified functional condition by providing systematic inspection, quality control, detection and correction of early malfunctions. Most of the instruments used in nuclear medicine are rather complex systems built from mechanical, electrical and electronic parts. Any one of these components is liable to fail at some time or other. Repair could be done only by a specialist who is able to evaluate the condition of the various parts ranging from cables to connectors, from scintillators to photomultipliers, from microprocessors to microswitches. The knowledge of the intricacies of the various electronic components required for their repairs is quite wide and varied. The electronics industry turns out more and more multi-purpose chips which can carry out the functions of many parts used in the instruments of the earlier generation. This provides protection against unauthorized copying of the circuits but it serves another purpose as well of inhibiting repairs by non-factory personnel. These trends of the instrument design should be taken into consideration when a policy has to be developed for the repairs of the hospital based equipment

  6. Experiences on implementation of on-the-job training programmes for maintenance personnel in Asco and Vandellos II NPP

    International Nuclear Information System (INIS)

    Gonzalez Anez, F.

    2002-01-01

    This paper presents a process and methodology for definition and implementation of On-Job-Training Programmes (OJTP) for new maintenance personnel in Asco and Vandellos II. The content of these OJTP has been defined for each maintenance job position. A simplified task analysis was carried out to specify common and specific training. Generally, the specific maintenance training programs includes training modules in classroom and workshop environment on (1) maintenance of components and (2) maintenance fundamentals of mechanical, electrical and instrumentation. This specific training has been finally completed with a OJT programme based on the execution, observation or/and discussion about the main maintenance activities under entitled worker supervision. Each lesson, task or activity is defined in a format where the training objective, milestones and deliverables are specified. The list of activities makes up the OJTP. It is based on applicable plant procedures and maintenance instruction to each job position. Several participants or actors have been defined to implement the OJTP: co-ordinator of the process, tutors for each OJT task, line maintenance manager and trainee. Co-ordinator is the link among all actors. He knows the OJTP scope and plans the training activities according to the line maintenance manager. Co-ordinator carries out a tracking process, informs to training and maintenance managers about the progress in the programme, elaborates the progress and final reports and keeps training records. Tutors, usually entitled workers in the job position, transfer the knowledge to the trainee and discuss, review and assess the trainee's performance. Trainee carries out the scheduled tasks, keeps records of work done, prepares deliverables and informs about his activities to the Co-ordinator. The OJT programme for each new maintenance worker starts with a launching meeting with all involved actors. The goals of this meeting are to explain the OJTP scope and

  7. Key Performance Indicators for Maintenance Management Effectiveness of Public Hospital Building

    Directory of Open Access Journals (Sweden)

    Farhana Omar Mardhiah

    2017-01-01

    Full Text Available Effectiveness of management in maintenance aspect holds the key element in influencing the performance of overall maintenance management. Similarly, public hospital building needs an effective maintenance management as this type of building in nature is one of the most complex issues in the field of maintenance. Improper building maintenance management adopted by the organization significantly will interrupt the overall operation of the building. Therefore, this paper is aim to identifying the key performance indicator (KPI of effectiveness of maintenance management for the public hospital building. A total of 32 set of questionnaires were distributed to the maintenance manager for each hospital in the northern region of peninsular Malaysia by using self-administration strategy. The survey answer was analyzed by performing descriptive analysis in SPSS. Overall, the result of descriptive analysis shows that all the ten factors of effectiveness of maintenance management are accepted as KPI since the mean value is at least 3.93 which classified as important and significant. The most significant factor of effectiveness of maintenance management is task planning and scheduling with the mean score of 4.35. While less significant factor is identify as maintenance approach with the value of mean score is 3.93. The both results indicates that the management need to have well-structured planning for the maintenance works and also need to embrace the exact strategy of maintenance approach in order to achieved better overall performance of maintenance management. This study may draw a standard practice for the government in assessing the performance of public facilities in terms of maintenance management.

  8. Downlink scheduling using non-orthogonal uplink beams

    KAUST Repository

    Eltayeb, Mohammed E.

    2014-04-01

    Opportunistic schedulers rely on the feedback of the channel state information of users in order to perform user selection and downlink scheduling. This feedback increases with the number of users, and can lead to inefficient use of network resources and scheduling delays. We tackle the problem of feedback design, and propose a novel class of nonorthogonal codes to feed back channel state information. Users with favorable channel conditions simultaneously transmit their channel state information via non-orthogonal beams to the base station. The proposed formulation allows the base station to identify the strong users via a simple correlation process. After deriving the minimum required code length and closed-form expressions for the feedback load and downlink capacity, we show that i) the proposed algorithm reduces the feedback load while matching the achievable rate of full feedback algorithms operating over a noiseless feedback channel, and ii) the proposed codes are superior to the Gaussian codes.

  9. Downlink scheduling using non-orthogonal uplink beams

    KAUST Repository

    Eltayeb, Mohammed E.; Al-Naffouri, Tareq Y.; Bahrami, Hamid Reza Talesh

    2014-01-01

    Opportunistic schedulers rely on the feedback of the channel state information of users in order to perform user selection and downlink scheduling. This feedback increases with the number of users, and can lead to inefficient use of network resources and scheduling delays. We tackle the problem of feedback design, and propose a novel class of nonorthogonal codes to feed back channel state information. Users with favorable channel conditions simultaneously transmit their channel state information via non-orthogonal beams to the base station. The proposed formulation allows the base station to identify the strong users via a simple correlation process. After deriving the minimum required code length and closed-form expressions for the feedback load and downlink capacity, we show that i) the proposed algorithm reduces the feedback load while matching the achievable rate of full feedback algorithms operating over a noiseless feedback channel, and ii) the proposed codes are superior to the Gaussian codes.

  10. Maintenance and disassembly considerations for the Technology Demonstration Facility

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1983-01-01

    The Technology Demonstration Facility (TDF) is a tandem-mirror design concept carried out under the direction of Lawrence Livermore National Laboratory. It was conceived as a near-term device with a mission of developing engineering technology in a D-T fusion environment. Overall maintenance and component disassembly were among the responsibilities of the Fusion Engineering Design Center (FEDC). A configuration evolved that was based on the operational requirements of the components, as well as the requirements for their replacements. Component lifetime estimates were used to estimate the frequency and the number of replacements. In addition, it was determined that the need for remote handling equipment followed within 1.5 years after initial start-up, emphasizing the direct relationship between developing maintenance scenarios/equipment and the device configuration. Many of the scheduled maintenance operations were investigated to first order, and preliminary handling equipment concepts were developed

  11. Maintenance Mentor

    National Research Council Canada - National Science Library

    Jacobs, John

    2003-01-01

    Maintenance Mentor (MXM) is a research effort conducted by a joint AFRL/HESR and Northrop Grumman Information Technology team to identify the basic, high-level requirements necessary for improving flight line diagnostic capabilities...

  12. Experimental designs for autoregressive models applied to industrial maintenance

    International Nuclear Information System (INIS)

    Amo-Salas, M.; López-Fidalgo, J.; Pedregal, D.J.

    2015-01-01

    Some time series applications require data which are either expensive or technically difficult to obtain. In such cases scheduling the points in time at which the information should be collected is of paramount importance in order to optimize the resources available. In this paper time series models are studied from a new perspective, consisting in the use of Optimal Experimental Design setup to obtain the best times to take measurements, with the principal aim of saving costs or discarding useless information. The model and the covariance function are expressed in an explicit form to apply the usual techniques of Optimal Experimental Design. Optimal designs for various approaches are computed and their efficiencies are compared. The methods working in an application of industrial maintenance of a critical piece of equipment at a petrochemical plant are shown. This simple model allows explicit calculations in order to show openly the procedure to find the correlation structure, needed for computing the optimal experimental design. In this sense the techniques used in this paper to compute optimal designs may be transferred to other situations following the ideas of the paper, but taking into account the increasing difficulty of the procedure for more complex models. - Highlights: • Optimal experimental design theory is applied to AR models to reduce costs. • The first observation has an important impact on any optimal design. • Either the lack of precision or small starting observations claim for large times. • Reasonable optimal times were obtained relaxing slightly the efficiency. • Optimal designs were computed in a predictive maintenance context

  13. Feedback of operation and maintenance experience into evolutionary plant design (HWRs)

    International Nuclear Information System (INIS)

    Hedges, K.R.; Sanatkumar, A.; Kwon, Oh-Cheol

    1999-01-01

    The process of feeding back operation and maintenance information into the CANDU plant design process has been in constant evolution since the beginning of the CANDU program. The commissioning and operation experience from the first commercial reactors at Pickering A and Bruce A was used extensively in the design of the first generation CANDU 6 Plants. These units have been in operation for 15 years, producing electricity at an average lifetime capacity factor of about 85%. In further advancing the CANDU 6 and 9 design, greater emphasis is placed on enhancements that can reduce operational costs and further improve plant performance by reducing the planned outage time. The plant design has been improved to facilitate maintenance scheduling, equipment isolation, maintenance and post maintenance testing. Individual tasks have been analyzed as well as the interaction between tasks during outages to reduce the down time required and simplify the execution of the work. This results in shorter outages, reduced radioactive dose and reduced costs. The Utilities have continued to play an important role in CANDU 6 Evolution. Specifically; the Korea Utility KEPCO has one of the original four CANDU 6 Plants and three of the most modem. Their feedback to the designers has been very helpful. One of the most important feedback processes is through the CANDU Owners Group, which provides information exchange between members. In India eight PHWRs of 220 MWe capacity are in operation. Four reactors, also of 220 MWe capacity are in advanced stages of construction. Site construction work of two units of 500 MWe PHWRs at Tarapur will be taken up shortly. Over the years, during construction and operation of these power stations, a large amount of experience has been accumulated. Operation and maintenance experience is shared with operating stations by intensive participation of design engineers in Station Operation Review meetings, trouble shooting and root cause analysis of problems

  14. Pilot Study for Maintenance Rule at KSNP

    International Nuclear Information System (INIS)

    Choi, Kwang Hee; Jeong, Hyeon Jong; Jee, Moon Hak; Hong, Sung Yull

    2005-01-01

    Maintenance Rule (MR), which was developed to monitor the effectiveness of maintenance in a nuclear power plant (NPP), has been received as highly successful program by and large since its implementation in 1996 in the United States. Korea has initiated two pilot programs to implement the Maintenance Rule program in 2003. Selected plants for the pilot implementation are Kori 3 and 4 units and Ulchin 3 and 4 units, where Kori 3 and 4 units are Westinghouse units and Ulchin 3 and 4 units are Korean Standardized Nuclear Power (KSNP) Plant units. This paper describes the results of each key tasks completed to date and insights gained from pilot study on the KSNP units. Currently, Scoping of the functions of maintenance rule and determination of safety significance level have been completed during first year. As first task, total 607 functions were identified and defined by detailed function analysis on 135 systems that cover all plant systems. About 55% of total functions are selected as within the scope of maintenance rule. Among these inscoped functions, 56% of scoped functions are safety related and 44% are non-safety related functions. Evaluation of safety significance for each function was determined by expert panel consist of eight experts in field of plant maintenance, operation, PSA, work schedule and system engineers. As a result, about 46% of functions were determined to be high safety significant functions and rest of the functions were classified as low safety significant. The remaining tasks that are included determination of performance criteria and preparation of implementing guideline will be performed in following years

  15. Joint Network Coding and Opportunistic Scheduling for the Bidirectional Relay Channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-05-27

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users’ transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited.

  16. Joint Network Coding and Opportunistic Scheduling for the Bidirectional Relay Channel

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein; Alouini, Mohamed-Slim; Zafar, Ammar

    2013-01-01

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users’ transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited.

  17. Application of reliability centred maintenance to optimize operation and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    In order to increase Member States capabilities in utilizing good engineering and management practices the Agency has developed a series of Technical Documents (TECDOCs) to describe best practices and members experience in the application of them. This TECDOC describes the concept of Reliability Centred Maintenance (RCM) which is the term used to describe a systematic approach to the evaluation, design and development of cost effective maintenance programmes for plant and equipment. The concept has been in existence for over 25 years originating in the civil aviation sector. This TECDOC supplements previous IAEA publications on the subject and seeks to reflect members experience in the application of the principles involved. The process focuses on the functionality of the plant and equipment and the critical failure mechanisms that could result in the loss of functionality. When employed effectively the process can result in the elimination of unnecessary maintenance activities and the identification and introduction of measures to address deficiencies in the maintenance programme. Overall the process can result in higher levels of reliability for the plant and equipment at reduced cost and demands on finite maintenance resources. The application of the process requires interaction between the operators and the maintenance practitioners which is often lacking in traditional maintenance programmes. The imposition of this discipline produces the added benefit of improved information flows between the key players in plant and equipment management with the result that maintenance activities and operational practices are better informed. This publication was produced within IAEA programme on nuclear power plants operating performance and life cycle management

  18. Knowledge engineering thinking of maintenance

    International Nuclear Information System (INIS)

    2007-01-01

    Maintenance optimization problem could not always settled mathematically and was obliged to use quasi-optimum solution with omitting non-formulated limiting condition or neglecting part of optimization object. In such a case knowledge engineering thinking was encouraged. Maintenance of complicated plant and artificial system should be considered from artificial object (equipment/facility hardware and system), technical information and knowledge base, and organizational and human aspect or society and institution. Comprehensive management system in organization and society was necessary not only for assuring integrity of equipment but also for attaining higher performance, reliability and economics of system. For better judgment it was important to share mechanism to make use of more information with organization or whole society. It was required to create database and data mining for knowledge base management system of maintenance. Maintenance was called 'last fortress' to assure quality such as reliability and safety of required function of equipment. Strategic approach to develop maintenance technology under cooperation was considered. Life extension R and D road map was launched in 2005. (T. Tanaka)

  19. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  20. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  1. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  2. Cloud Computing for Maintenance Performance Improvement

    OpenAIRE

    Kour, Ravdeep; Karim, Ramin; Parida, Aditya

    2013-01-01

    Cloud Computing is an emerging research area. It can be utilised for acquiring an effective and efficient information logistics. This paper uses cloud-based technology for the establishment of information logistics for railway system which requires information based on data from different data sources (e.g. railway maintenance, railway operation, and railway business data). In order to improve the performance of the maintenance process relevant data from various sources need to be acquired, f...

  3. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  4. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  5. 12 CFR 404.16 - Schedule of fees.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Schedule of fees. 404.16 Section 404.16 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES INFORMATION DISCLOSURE Access to Records Under the Privacy Act of 1974 § 404.16 Schedule of fees. (a) Search and review. Ex-Im Bank shall not charge for...

  6. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  7. Assessment of building maintenance in Nigerian university system ...

    African Journals Online (AJOL)

    Building maintenance involves preserving a building so that it can retain its economic value ... maintenance policy by employing outsourcing maintenance services. ... services including the use of information and communication technology.

  8. 77 FR 32433 - Proposed FOIA Fee Schedule Update

    Science.gov (United States)

    2012-06-01

    ... 1703 Proposed FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice... Defense Nuclear Facilities Safety Board is publishing its proposed Freedom of Information Act (FOIA) Fee.... on or before July 2, 2012. ADDRESSES: Comments on the proposed fee schedule should be mailed or...

  9. Nuclear power plants maintenance

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Nuclear power plants maintenance now appears as an important factor contributing to the competitivity of nuclea energy. The articles published in this issue describe the way maintenance has been organized in France and how it led to an actual industrial activity developing and providing products and services. An information note about Georges Besse uranium enrichment plant (Eurodif) recalls that maintenance has become a main data not only for power plants but for all nuclear industry installations. (The second part of this dossier will be published in the next issue: vol. 1 January-February 1989) [fr

  10. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    International Nuclear Information System (INIS)

    Liu, Xuejuan; Wang, Binrong

    2017-01-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cycle. In each cycle, beyond production time we also consider some reserve time for maintenance and setup, shortage and overproduction may occur. We study the integrated problem based on two PM policies, and explain the situation with the other PM policies. The delay – time concept is used to model PM decisions. Findings: Using the integrated EPQ and PM model, we can calculate the optimal production planning and PM schedule simultaneously, especially we consider multiple products in each production cycle, which is more practical and economic than previous works. Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  11. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xuejuan; Wang, Binrong

    2017-07-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cycle. In each cycle, beyond production time we also consider some reserve time for maintenance and setup, shortage and overproduction may occur. We study the integrated problem based on two PM policies, and explain the situation with the other PM policies. The delay – time concept is used to model PM decisions. Findings: Using the integrated EPQ and PM model, we can calculate the optimal production planning and PM schedule simultaneously, especially we consider multiple products in each production cycle, which is more practical and economic than previous works. Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  12. People's response to the promotion of the effective use of nuclear power plants. From the viewpoint of favoring providing information about maintenance activities

    International Nuclear Information System (INIS)

    Sakai, Yukimi; Ueda, Yoshitaka; Goto, Manabu

    2010-01-01

    In order to elucidate people's response to the promotion of the effective use of nuclear power plants by high-reliability maintenance, we conducted a questionnaire survey targeting 306 respondents living in the cities of Kyoto, Osaka and Kobe. The questionnaire comprises information about maintenance contents and regulatory system concerning extension of plant operation cycle, long life operation, and plant power-up, not as a measure for safety but a measure for promoting effective use of power plants. It was found that a high number of respondents held a positive attitude towards the promotion of the effective use of plants, even if they tend to be anxious about safety problems. Moreover, the study suggests that no enhance the feeling of safety, information about maintenance activities and regulatory system was more effective than information about actual technical possibility. (author)

  13. Optimization of maintenance programme at Daya Bay Nuclear Power Station based on RCM analysis results

    International Nuclear Information System (INIS)

    Liu Min

    2003-01-01

    This paper begins with an introduction to Guangdong Daya Bay Nuclear Power Station (GNPS) and gives a simple introduction to the operations and maintenance documentation system at GNPS. It then will review the maintenance program guidelines base and the associated problems prior to the application of reliability centered maintenance (RCM). How RCM was implemented at GNPS, how the results of RCM analysis were used to optimize the maintenance program and test program, and what is the interface between RCM and the existing maintenance program will be shown. Next, it will show the successful implementation of RCM at GNPS resulted in the following changes: A new understanding of equipment failure challenges operations and maintenance beliefs, maintenance concepts undergo a large change, maintenance program and periodic testing program are continuously modified and optimized, new on-condition maintenance technologies are introduced, non-productive scheduled overhauls are discarded, maintenance costs are effectively controlled, maintenance appropriateness has improved, management of hidden failures is more effective and timely. It will show the benefit of greater equipment reliability brought about by all of these changes, which in turn increases the reliability and safety of the entire power station. (author)

  14. Track 6: safety and risk management. Plant operational risk management. Plant Configuration Risk Assessment Methodology Development for Periodic Maintenance

    International Nuclear Information System (INIS)

    Yang, Huichang; Chung, Chang Hyun; Sung, Key Yong

    2001-01-01

    plant risk level. Such a change in the arrangement of the plant equipment and system at a given time period can be represented as the plant configuration. The plant configuration risk assessment methodology that was developed during this study consists of six steps, as follows: 1. Identification of plant configuration: In this step, various events that occurred in the plant should be identified through a review of the plant operation records such as the periodic maintenance and inspection schedules, maintenance or repair request logs, trouble reports, and other documents related to operational activity. 2. Evaluation of probabilistic risk assessment (PRA) model and computer codes: For the effective evaluation of plant risk during normal operation, an appropriate plant risk model should 273 be used, and the capability of computer codes should be evaluated. There might be numerous events that require the maintenance activity during normal operation. To handle these events during the risk calculation, an optimized plant PRA model and a risk analysis tool of fast calculation capacity are needed. 3. Development of baseline risk model and evaluation of baseline risk: The baseline risk model is a risk model similar to that used for the level 1 PRA, but the maintenance-related events are excluded. This methodology focuses on the relative risk change caused by the usual plant events. For this purpose, the baseline risk that will be the reference of risk variation should be evaluated as reasonably as possible. 4. Analysis of components and systems: For the detailed risk analysis, it is useful to perform the importance analysis for the target components or systems before calculating the plant risks. In terms of system unavailability analysis and importance analysis, information of specific components and systems should be performed for the detailed risk analysis 5. Evaluation of configuration risks and sensitivity analysis: Using the configuration and the system information from

  15. Analysis of the ITER ECH Upper Port Launcher remote maintenance using virtual reality

    International Nuclear Information System (INIS)

    Elzendoorn, Ben; de Baar, Marco; Chavan, Rene; Goodman, Timothy; Heemskerk, Cock; Heidinger, Roland; Kleefeldt, Klaus; Koning, Jarich; Sanders, Stephen; Spaeh, Peter; Strauss, Dirk; Verhoeven, Toon; Vreede, Fred de

    2009-01-01

    All ITER sub-systems of remote handling (RH) classes 1 and 2 have to be remotely maintainable. The maintenance strategy for these components has to ensure system availability after failure or scheduled maintenance. This paper shows how virtual reality (VR) simulation can be used as a tool to analyze the maintenance process, to predict the mean time to repair and to ensure the RH compatibility of one ITER sub-system, the Upper Port Launcher (UPL) . Special emphasis is put on the development of RH procedures and the identification of tooling requirements. The possibility to simulate RH logistics and repair actions in an early stage of the design process allows for the identification of those maintenance actions that require dedicated tests in the Launcher Handling Test Facility at Karlsruhe. The VR analysis, together with dedicated mock-up tests will demonstrate the RH compatibility of the UPL plug, provide input to the design of the Port Plug maintenance area in the ITER Hot Cell, and support the development of RH maintenance tooling.

  16. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  17. Genetic algorithm to solve the problems of lectures and practicums scheduling

    Science.gov (United States)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  18. Sharing Data for Production Scheduling Using the ISA-95 Standard

    Energy Technology Data Exchange (ETDEWEB)

    Harjunkoski, Iiro, E-mail: iiro.harjunkoski@de.abb.com; Bauer, Reinhard [ABB Corporate Research, Industrial Software and Applications, Ladenburg (Germany)

    2014-10-21

    In the development and deployment of production scheduling solutions, one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment, and other resources are necessary for producing a realistic short-term production plan. Currently, a widely accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data exchange for scheduling solutions.

  19. Sharing Data for Production Scheduling Using the ISA-95 Standard

    International Nuclear Information System (INIS)

    Harjunkoski, Iiro; Bauer, Reinhard

    2014-01-01

    In the development and deployment of production scheduling solutions, one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment, and other resources are necessary for producing a realistic short-term production plan. Currently, a widely accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data exchange for scheduling solutions.

  20. Sharing data for production scheduling using the ISA-95 standard

    Directory of Open Access Journals (Sweden)

    Iiro eHarjunkoski

    2014-10-01

    Full Text Available In the development and deployment of production scheduling solutions one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment and other resources are necessary for producing a realistic short-term production plan. Currently, a widely-accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data-exchange for scheduling solutions.

  1. 3D digital dynamic management of maintenance projects for nuclear power plant

    International Nuclear Information System (INIS)

    Wang Baizhong; Luo Yalin; Fang Hao; Ma Li; Zhang Jie; Wang Ruobing; Xie Min

    2005-01-01

    The whole process for the application of digital plant technique in the equipment transport in reactor building and the dynamic management of the spatial arrangement in Daya Bay Nuclear Power Station was introduced in the paper. The establishment of 3D digital Daya Bay plant, and the method and procedure to apply it in the nuclear power plant maintenance project have been discussed. This project utilizes the outer database to preserve the maintenance status of equipments, and avoids the damage or changing of the original 3D final model. Based on the maintenance procedure, the spatial arrangement and schedule for the maintenance of nuclear power station have been simulated and optimized for the whole process. This technique can simulate and optimize the arrangement and spatial arrangement for maintenance in limited space. It has been applied successfully in the reactor vessel head replacement for Unit 2 of Daya Bay NPP to shorten the time for key routes and the total time of this project by 16 hours and 92.5 hours, respectively. (author)

  2. Architecture and Key Techniques of Augmented Reality Maintenance Guiding System for Civil Aircrafts

    Science.gov (United States)

    hong, Zhou; Wenhua, Lu

    2017-01-01

    Augmented reality technology is introduced into the maintenance related field for strengthened information in real-world scenarios through integration of virtual assistant maintenance information with real-world scenarios. This can lower the difficulty of maintenance, reduce maintenance errors, and improve the maintenance efficiency and quality of civil aviation crews. Architecture of augmented reality virtual maintenance guiding system is proposed on the basis of introducing the definition of augmented reality and analyzing the characteristics of augmented reality virtual maintenance. Key techniques involved, such as standardization and organization of maintenance data, 3D registration, modeling of maintenance guidance information and virtual maintenance man-machine interaction, are elaborated emphatically, and solutions are given.

  3. The potential cost from passengers and how it impacts railway maintenance and renewal decisions

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Nielsen, Otto Anker

    To plan Maintenance and Renewals (M&R) for the heavy railway lines, scheduling work possession time and deciding the closure of railway line are quite challenging for Infrastructure Manager (IM) at tactical planning level. As usual, the direct costs such as the materials costs, man power price...

  4. Migration of the CNA maintenance information system to a client server architecture

    International Nuclear Information System (INIS)

    Gonzalez Crego, E.; Martin Lopez-Suevos, C.

    1994-01-01

    The paper explains the guidelines and methodology followed to carry out regulation of the CNA computerized maintenance system (SIGE) to a system with a client/server architecture based on ORACLE. The following guidelines were established to carry out migration: 1 Ensure that the new system would contain all the information of the former system, ie, no information would be lost during migration. 2 Improve the technical design of the application, while maintaining at least the functionality of the former application 3 incorporate modifications into the application which would permit incremental improvement of its functionality. 4 Carry out migration at the minimum cost in time and resources to construct the application, a strict development methodology was followed and certain standards were drawn up to significantly increase the speed. Special use was made of: 1 Data models 2 Process models which operate the data model 3 SQL-FORMS standards 4 Safety features

  5. FORMING OF FUNCTIONAL MAINTENANCE OF INFORMATIVE SYSTEM PLANNING OF SCIENTIFIC RESEARCHES IN NAPN OF UKRAINE

    Directory of Open Access Journals (Sweden)

    Tetyana V. Kuznetsova

    2010-09-01

    Full Text Available Relevance of the material stated in article is caused by urgent needs of society in creation of administrative information systems, in particular Information system of planning of scientific researches in National Academy of Pedagogical Sciences of Ukraine on Internet basis (ІС "Planning". Information and technological support of processes of planning of scientific researches which are carried out in scientific institutions of NAPS of Ukraine is the purpose of creation of this system. The parameters of the functional maintenance of the informative system are pointed in the article, technology of treatment of documents on planning of scientific researches, scheme of routes of working of separate documents, and proper diagrams of their business-processes, on the basis of which using programmatic facilities of Microsoft Sharepoint the functions of programming are automatized, is examined.

  6. Obtaining information ultra-fast as-built in areas of high radiation to support decisions in maintenance

    International Nuclear Information System (INIS)

    Sarti Fernandez, F.

    2010-01-01

    One of the problems that arise when studying, planning and assessing a particular maintenance operation has to be performed in high radiation areas, is the determination of the level of reliability of information starting from the one available. For the past several years have been used in nuclear power plants worldwide acquisition systems called 3D laser scanner models.

  7. Radwaste treatment complex. DRAWMACS planned maintenance system

    International Nuclear Information System (INIS)

    Keel, A.J.

    1992-07-01

    This document describes the operation of the Planned Maintenance System for the Radwaste Treatment Complex. The Planned Maintenance System forms part of the Decommissioning and Radwaste Management Computer System (DRAWMACS). Further detailed information about the data structure of the system is contained in Database Design for the DRAWMACS Planned Maintenance System (AEA-D and R-0285, 2nd issue, 25th February 1992). Information for other components of DRAWMACS is contained in Basic User Guide for the Radwaste Treatment Plant Computer System (AEA-D and R-0019, July 1990). (author)

  8. On-Line Maintenance Methodology Development

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyo Won; Kim, Jae Ho; Jae, Moo Sung [Hanyang University, Seoul (Korea, Republic of)

    2012-05-15

    Most of domestic maintenance activities for nuclear power plants are performed while overhaul. Therefore, On-Line Maintenance (OLM) is one of the proper risks informed application techniques for diffusing maintenance burden during overhaul with safety of the plant is secured. The NUMARC 93-01 (Rev.3) presents the OLM state of the art and it provides methodology. This study adopts NUMARC 93-01 (Rev.3) and present OLM. The reference component is Emergency Diesel Generator (EDG) of Ulchin 3, 4

  9. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  10. Automatic and manual operation modes of the TFTR maintenance manipulator

    International Nuclear Information System (INIS)

    Boehme, G.; Gumb, L.; Lotz, E.; Mueller, G.; Selig, M.

    1987-01-01

    The remote in-vessel operations scheduled to maintain the TFTR at Princeton, NJ, USA, comprise inspection, calibration, cleaning and protective tile replacement. The environmental conditions inside the torus vessel are ultra high vacuum, moderate γ-radiation and 150 0 C temperature of the vessel structure. The Princeton Plasma Physics Laboratory (PPPL) and KfK are jointly developing a maintenance manipulator (MM) which can perform these tasks. (orig./HP)

  11. Moral, Ethical and Legal Considerations with the Use of Drugs for Performance Maintenance in the Canadian Forces

    Science.gov (United States)

    2009-10-01

    drugs . Most controlled drugs with performance maintenance characteristics would fall under schedule 3 of the Act. CF members’ consumption of performance...21 - 4 RTO-MP-HFM-181 Disorder (ADHD) to increase attention. Caffeine itself is the world’s most widely used psychoactive drug and by far the...RTO-MP-HFM-181 21 - 1 Moral, Ethical and Legal Considerations with the Use of Drugs for Performance Maintenance in the Canadian Forces

  12. The-Abstraction-Hierarchy-based Mobile PC Display Design for NPP Maintenance

    International Nuclear Information System (INIS)

    Kim, In; Kim, Bo Gyung; Seong, Poong Hyun; Ha, Jun Su

    2010-01-01

    Recently, the importance of effective maintenance in nuclear power plants (NPPs) has been emphasized and research into effective maintenance by adopting mobile maintenance aids (MMAs) have been attempted. For improved and effective use of an MMA display design method based on abstraction hierarchy (AH) is proposed and its design considerations are discussed in this study. Six levels of abstraction hierarchy are proposed in this paper to classify the maintenance information. By classifying and organizing maintenance information using AH, maintenance information can be used effectively by users with either high or low levels of expertise. When information classification has been finished, the information for MMA design is selected and designed. With the considerations of MMA design analysis and guidelines, AH-based MMA is designed for the maintenance tasks. An experiment is conducted using the AH-based MMA in order to estimate the effectiveness of the proposed method for the maintenance tasks and to identify design considerations to enhance the proposed MMAs. The result indicated that an AH-based manual was more effective than a conventional manual in terms of task completion time and number of errors. The workload for the AH-based manual was estimated less than the conventional manual for subjects with low level of expertise. As the level of expertise increases, subjects tended to follow more abstract information while the number of navigations decreased. It is believed that when mobile devices become pervasive in NPP maintenance fields, AH-model applied MMAs can be used as an effective maintenance supporting tool

  13. Applying Systems Engineering to Improve the Main Gas Turbine Exhaust System Maintenance Strategy for the CG-47 Ticonderoga Class Cruiser

    Science.gov (United States)

    2015-09-01

    national security and prosperity (U.S. Navy 2014). In perspective, oceans are the lifeblood of the planet and its entire population . The National...maintenance strategy, reliability-centered maintenance, cost, schedule, performance, growth -work, new-work, optimal fleet response plan, time-directed...76 5. Main Gas Turbine Exhaust System Growth -Work ..................77 E. RECOMMENDATIONS TO IMPROVE THE MAIN GAS TURBINE EXHAUST SYSTEM

  14. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  15. Amphetamine increases schedule-induced drinking reduced by negative punishment procedures.

    Science.gov (United States)

    Pérez-Padilla, Angeles; Pellón, Ricardo

    2003-05-01

    d-Amphetamine has been reported to increase schedule-induced drinking punished by lick-dependent signalled delays in food delivery. This might reflect a drug-behaviour interaction dependent on the type of punisher, because no such effect has been found when drinking was reduced by lick-contingent electric shocks. However, the anti-punishment effect of amphetamine could be mediated by other behavioural processes, such as a loss of discriminative control or an increase in the value of delayed reinforcers. To test the effects of d-amphetamine on the acquisition and maintenance of schedule-induced drinking reduced by unsignalled delays in food delivery. Rats received 10-s unsignalled delays initiated by each lick after polydipsia was induced by a fixed-time 30-s food reinforcement schedule or from the outset of the experiment. Yoked-control rats received these same delays but independently of their own behaviour. d-Amphetamine (0.1-3.0 mg/kg) was then tested IP. d-Amphetamine dose-dependently increased and then decreased punished schedule-induced drinking. The drug led to dose-dependent reductions when the delays were not contingent or when they were applied from the outset of training. These results support the contention that d-amphetamine has an increasing effect on schedule-induced drinking that has been previously reduced by a negative punishment procedure. This effect cannot be attributed to other potentially involved processes, and therefore support the idea that drug effects on punished behaviour depend on punishment being delays in food or shock deliveries.

  16. Status of the reliability centered maintenance program at Ontario Hydro's Bruce 'A' Nuclear Division

    International Nuclear Information System (INIS)

    Khan, I.

    1995-01-01

    Bruce A started a preventive maintenance (PM) quality improvement program in August of 1991. This initiative was taken to address the concerns expressed by the AECB and the Peer Audits finding. The concerns were on the quality of the Bruce A PM Program and its execution in the field. Reliability Centered Maintenance (RCM) analysis was selected as the PM program quality improvement and optimization technique. Therefore, RCM became a key component of Bruce A's Integrated PM program and maintenance strategy. As a result of RCM implementation, and improvements in the work planning and scheduling process, Bruce A is seeing downward trends in the corrective maintenance work load, maintenance preventable forced outages, overdue/missed PM tasks and corrective maintenance backlog. Control Room Operators have reported observing an improvement in systems and equipment response to transients. Other benefits include a documented, controlled and traceable PM program. In addition, the team approach required by RCM has started to improve staff confidence in the PM program which, in turn, is improving the compliance with the PM program. (author)

  17. Scheduling Broadcasts in a Network of Timelines

    KAUST Repository

    Manzoor, Emaad A.

    2015-05-12

    Broadcasts and timelines are the primary mechanism of information exchange in online social platforms today. Services like Facebook, Twitter and Instagram have enabled ordinary people to reach large audiences spanning cultures and countries, while their massive popularity has created increasingly competitive marketplaces of attention. Timing broadcasts to capture the attention of such geographically diverse audiences has sparked interest from many startups and social marketing gurus. However, formal study is lacking on both the timing and frequency problems. In this thesis, we introduce, motivate and solve the broadcast scheduling problem of specifying the timing and frequency of publishing content to maximise the attention received. We validate and quantify three interacting behavioural phenomena to parametrise social platform users: information overload, bursty circadian rhythms and monotony aversion, which is defined here for the first time. Our analysis of the influence of monotony refutes the common assumption that posts on social network timelines are consumed piecemeal independently. Instead, we reveal that posts are consumed in chunks, which has important consequences for any future work considering human behaviour over social network timelines. Our quantification of monotony aversion is also novel, and has applications to problems in various domains such as recommender list diversification, user satiation and variety-seeking consumer behaviour. Having studied the underlying behavioural phenomena, we link schedules, timelines, attention and behaviour by formalising a timeline information exchange process. Our formulation gives rise to a natural objective function that quantifies the expected collective attention an arrangement of posts on a timeline will receive. We apply this formulation as a case-study on real-data from Twitter, where we estimate behavioural parameters, calculate the attention potential for different scheduling strategies and, using the

  18. Increasing the efficiency of roadway drivages through the application of advanced information, automation and maintenance technologies

    Energy Technology Data Exchange (ETDEWEB)

    A. Rodriguez; M. Schmid; T. Winkler (and others) [Asociacion para la Investigacion y el Desarrollo Industrial de los Recursos Naturales, Leganes (Spain)

    2009-07-01

    The main goal of the IAMTECH project was increasing the efficiency of road-heading by applying advanced information, automation and maintenance technologies. Some of its results will allow for increasing the availability of the machinery through the decrease of both programmed maintenance time and medium time to repair. Other results are related to the adoption of new types (in coal mining) of support considered promising from a productivity increase perspective, such as concrete spraying. Research topics addressed in the project could be classified roughly in two groups: horizontal (underlying common technologies) and vertical (related to the actual implementation of devices, software and systems). Among the results for horizontal activities, those that deserve special mention are the development of an Atex 3D laser scanner, Atex WLAN (WiFi) access points, cameras and PDA, as well as methods for storing and representing in 3D machinery components, subassemblies and complete machines. Amid results of vertical activities is the implementation of a central maintenance control mining machinery is concentrated. Engineers in charge of CMCR have online access to all machinery-related information, including direct access to manufacturers' databases. Images, voice and data flowing from the underground, and diagrams and advice flowing from the surface are transmitted and displayed using the technologies developed during horizontal activities. Other important results are the development of methods for assessing the quality of execution of roadway support when using sprayed concrete for this purpose, also using technologies (such as laser scanning) developed within the horizontal activities. 10 refs., 162 figs., 7 tabs.

  19. 18 CFR 701.203 - Schedule of fees.

    Science.gov (United States)

    2010-04-01

    ... by the Public Information Officer on the basis of the balance between the benefit to the general public and the cost to the Water Resources Council. (d) Fees shall be limited to recovery of only direct... ORGANIZATION Availability of Information § 701.203 Schedule of fees. (a) The Public Information Officer will to...

  20. Work Scheduling by Use of Worker Model in Consideration of Learning by On-The-Job Training

    Science.gov (United States)

    Tateno, Toshitake; Shimizu, Keiko

    This paper deals with a method of scheduling manual work in consideration of learning by on-the-job training (OJT). In skilled work such as maintenance of trains and airplanes, workers must learn many tasks by OJT. While the work processing time of novice workers is longer than that of experts, the time will be reduced with repeated OJT. Therefore, OJT is important for maintaining the skill level and the long-term work efficiency of an organization. In order to devise a schedule considering OJT, the scheduler must incorporate a management function of workers to trace dynamically changing work experience. In this paper, after the relationship between scheduling problems and worker management problems is defined, a simulation method, in which a worker model and an agent-based mechanism are utilized, is proposed to derive the optimal OJT strategy toward high long-term performance. Finally, we present some case studies showing the effectiveness of OJT planning based on the simulation.

  1. A decentralized scheduling algorithm for time synchronized channel hopping

    Directory of Open Access Journals (Sweden)

    Andrew Tinka

    2011-09-01

    Full Text Available Time Synchronized Channel Hopping (TSCH is an existing Medium Access Control scheme which enables robust communication through channel hopping and high data rates through synchronization. It is based on a time-slotted architecture, and its correct functioning depends on a schedule which is typically computed by a central node. This paper presents, to our knowledge, the first scheduling algorithm for TSCH networks which both is distributed and which copes with mobile nodes. Two variations on scheduling algorithms are presented. Aloha-based scheduling allocates one channel for broadcasting advertisements for new neighbors. Reservation- based scheduling augments Aloha-based scheduling with a dedicated timeslot for targeted advertisements based on gossip information. A mobile ad hoc motorized sensor network with frequent connectivity changes is studied, and the performance of the two proposed algorithms is assessed. This performance analysis uses both simulation results and the results of a field deployment of floating wireless sensors in an estuarial canal environment. Reservation-based scheduling performs significantly better than Aloha-based scheduling, suggesting that the improved network reactivity is worth the increased algorithmic complexity and resource consumption.

  2. Development of standardized component\\0x2010based equipment specifications and transition plan into a predictive maintenance strategy.

    Science.gov (United States)

    2015-12-01

    This project investigated INDOT equipment records and equipment industry standards to produce standard equipment specifications : and a predictive maintenance schedule for the more than 1100 single and tandem axle trucks in use at INDOT. The research...

  3. Energeia of maintenance. Knowledge resource maintenance and creation of new value

    International Nuclear Information System (INIS)

    Iwata, Shuichi

    2011-01-01

    After the Fukushima accident occurred in March 2011, the intellectual energeia of maintenology (motive force of implementation) - 'arrow of information' - could be obtained by trying to establish academic agenda from uniting 'arrow of time' and 'arrow of entropy' based on historical review and then dividing characteristics of maintenance objects needed from society in the future, into content, context and measures in order to overcome this chaos. Looking at contaminated area map around Chernobyl and comparing state of Ukraine elapsed 25 years after Chernobyl accident with that of Fukushima in great social anxiety at present, various 'arrow of information' could be enumerated such as (1) openness of content of accident information and evaluation of context, (2) safety and stability of social society, (3) perfect individual's care and human right for knowing risk, (4) data literacy, (5) various risks, (6) data dissemination and (7) utilization of outsider's view. Knowledge maintenology should be expanded in the area such as (1) preservation of global environment and maintenology, (2) problem of contaminated area with radioactive materials: data science and maintenology, (3) maintenance of large artificial product: experimental science, theoretical science, computational science and maintenology, (4) maintenance of knowledge related with events having complicated causality: design science responding to various risks. As for utilization of nuclear energy, maintenance technology, which shall balance its benefit and risk of society and establish science needed for security of all human being -a raison d'etre and energeia of maintenology-, should be considered for upper structure about global energy, environment, economics and politics (including military affairs) and human society, not for respective energy system in specific country or organization. Fundamentals of energeia of maintenology shall be implemented in the same spirit of 'Yui', small mutual aid organization

  4. Applications of RFID into Nuclear Power Plant Maintenance System

    International Nuclear Information System (INIS)

    Lee, Seung Min; Seong, Poong Hyun

    2008-01-01

    RFID (Radio Frequency Identification) system, one of the most anticipated ubiquitous technologies is an automatic identification method using devices called RFID tags. RFID antenna detects each approach of RFID tags and recognizes the tags' ID and transfer to reader to do information processing. Since first introduced in the logistics industry, production management and maintenance organization in various fields of domestic and foreign enterprises introduce the RFID. Nuclear power plants are also using RFID to manage materials lately. However, the current status on the use of RFID is just a little more advanced on the use of bar code. Therefore, it seems that the important characteristic of RFID is not enough actualized to keep seeing. In point of Maintenance Information Field based on ubiquitous technology, the most important concept is real-time information processing. And RFID is quite proper to develop this information field system because it satisfies for the matter of that concept. The leading content in ubiquitous maintenance system is that maintenance personnel can get information what he needs and he can also transfer information what he gets whenever and wherever he is. In this paper, some examples of applying RFID in development of ubiquitous maintenance system are suggested

  5. Proceedings of the fourth international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1997-01-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance

  6. Proceedings of the fourth international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance.

  7. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  8. On-line maintenance at Cofrentes NPP

    International Nuclear Information System (INIS)

    Roldan Vilches, J.; Moreno Matarranz, M. A.; Hermana Mendioroz, I.

    1998-01-01

    Cofrentes NPP has begun in 1997 activities related to At Power Preventive Maintenance over trains or systems which lead to a voluntary entry in a Limitative Condition of Operation (LCO) of the Technical Specifications. From others benefits, this program ha improved the risk management and the staff's knowledge over the functions and safety implications of the different systems, the better exploit of the resources, the co-ordination of the different organisations involved (Maintenance an Operation) and the reductions of works during shutdowns. Previous to each work, a feasibility study analyzes qualitative and quantitative (PSA), using the Risk Monitor, the implications on safety of all the tasks, assuring that the global safety of the Plant is always maintained. Tech. Spec. are analyzed in detail and also are analyzed situations of simultaneous unavailabilities of systems which could lead to a high risk situation. Two different risk controls are defined (punctual and accumulated) to assure that high risk situations will not be given. Finally, historical risk profile is analyzed to assure that the accumulated risk increase is not significant. Risk Monitor helps staff in the schedule and follow-up of the activities of On-Line Maintenance. Each one of the tasks are deeply planned and harshly analyzed and are carried out by high qualified workers. By the moment, this program is running with fully satisfaction on the Plant. (Author)

  9. Digital maintenance field technology for the maintenance of nuclear power plant

    International Nuclear Information System (INIS)

    Sato, Tomomasa; Asama, Hajime; Kita, Nobuyuki; Numano, Masayoshi

    2002-01-01

    This paper proposes a concept of 'Digital Maintenance Field Technology', which enables human beings and working robots making fully use of the necessary information for maintenance activity not only in any location of the maintenance field (seamless in location) but also in any moment from the past to the future (seamless in time) and in any format in presenting to human (seamless in semantics). The paper points out the following three essential components of the technology: 1) 'Digital Field Construction Technology', 2) 'Digital Field Archival Technology' and 3) 'Digital Field Presentation Technology'. The necessary capabilities are extracted and our approaches and state of the art of realizing these capabilities are introduced in addition to present the state of the art of home application example. The future extension is also illustrated. (author)

  10. Designing of Vague Logic Based 2-Layered Framework for CPU Scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-01-01

    Full Text Available Fuzzy based CPU scheduler has become of great interest by operating system because of its ability to handle imprecise information associated with task. This paper introduces an extension to the fuzzy based round robin scheduler to a Vague Logic Based Round Robin (VBRR scheduler. VBRR scheduler works on 2-layered framework. At the first layer, scheduler has a vague inference system which has the ability to handle the impreciseness of task using vague logic. At the second layer, Vague Logic Based Round Robin (VBRR scheduling algorithm works to schedule the tasks. VBRR scheduler has the learning capability based on which scheduler adapts intelligently an optimum length for time quantum. An optimum time quantum reduces the overhead on scheduler by reducing the unnecessary context switches which lead to improve the overall performance of system. The work is simulated using MATLAB and compared with the conventional round robin scheduler and the other two fuzzy based approaches to CPU scheduler. Given simulation analysis and results prove the effectiveness and efficiency of VBRR scheduler.

  11. Conceptualization of an intellectual maintenance management system

    International Nuclear Information System (INIS)

    Suda, Kazunori; Yonekawa, Tsuyoshi; Yoshikawa, Shinji; Ozawa, Kenji

    1997-04-01

    It is studied in many research institute to enhance availability and safety of nuclear power plants operation and maintenance. On this account, development of autonomous plants has been carried out to replace the role of operators with artificial intelligence and autonomous robots. We have been developing an intellectual maintenance management system since 1994. As the first step, concept of an intellectual maintenance management system was constructed. The intellectual maintenance managerial system is in charge of maintenance function of an autonomous plant. The intellectual maintenance managerial system has three functions which is monitoring state and judging abnormal machine and deciding maintenance plan by autonomy. This system has an important role of indication and communication of the result to an autonomous operation system and autonomous robot. In this examination, we adopted the distributed and cooperative system technique by multi-agent of AI technology and examined a method to enforce problem solving by cooperation of sensor and actuator. In this report, we examined trouble detection and troubleshooting evaluation and maintenance plan decision function by the distributed and cooperative system technology, the distributed and cooperative system communication-function that these information releases functions was taken on. In conceptualization of the intellectual maintenance managerial system, we clarified of major functions to constitute this system and relation between autonomous operation system and autonomous robots. We clarified the information exchange scheme between this system and an outside system furthermore. In future, we will prototype each function and inspect the total system. (author)

  12. Development of inspection and maintenance program for reactor and reactivity control units in HANARO

    International Nuclear Information System (INIS)

    Cho, Yeong-Garp

    1998-01-01

    This paper summarizes the overall program for inspection and maintenance of reactor structure and Reactivity Control Units (RCU) of HANARO during lifetime. The long-term plan for in-service inspection is introduced in the viewpoint of the structural integrity of reactor and RCU, and the operability of RCU mechanism. This program includes the list of components to be inspected, the schedule of inspection and maintenance, and the development of special tools and test rig that are required for the remote inspection and maintenance of reactor and RCU components. Preliminary results of the evaluation on the lifetime of RCU components are summarized based on the operation history since the installation of reactor. A test rig will be designed and constructed for the purposes of verifying the prolonged lifetime of RCU components being used, the performance of special tools, and the rehearsal of maintenance work as well. (author)

  13. Vaccinating my way--use of alternative vaccination schedules in New York State.

    Science.gov (United States)

    Nadeau, Jessica A; Bednarczyk, Robert A; Masawi, Munyaradzi R; Meldrum, Megan D; Santilli, Loretta; Zansky, Shelley M; Blog, Debra S; Birkhead, Guthrie S; McNutt, Louise-Anne

    2015-01-01

    To identify children vaccinated following an alternative vaccine schedule using immunization information system data and determine the impact of alternative schedule use on vaccine coverage. Children born in New York State, outside New York City, between January 1, 2009 and August 14, 2011 were assessed for vaccination patterns consistent with use of an alternative schedule. Children who by 9 months of age had at least 3 vaccination visits recorded in the statewide mandatory immunization information system after 41 days of age were classified as either attempting to conform to the Centers for Disease Control and Prevention published recommended vaccination schedule or an alternative schedule. The number of vaccination visits and up-to-date status at age 9 months were compared between groups. Of the 222 628 children studied, the proportion of children following an alternative schedule was 25%. These children were significantly less likely to be up-to-date at age 9 months (15%) compared with those conforming to the routine schedule (90%, P Children following an alternative schedule on average had about 2 extra vaccine visits compared with children following a routine schedule (P children in this study appear to be intentionally deviating from the routine schedule. Intentional deviation leads to poor vaccination coverage leaving children vulnerable to infection and increasing the potential for vaccine-preventable disease outbreaks. Copyright © 2015 Elsevier Inc. All rights reserved.

  14. A novel downlink scheduling strategy for traffic communication system based on TD-LTE technology.

    Science.gov (United States)

    Chen, Ting; Zhao, Xiangmo; Gao, Tao; Zhang, Licheng

    2016-01-01

    There are many existing classical scheduling algorithms which can obtain better system throughput and user equality, however, they are not designed for traffic transportation environment, which cannot consider whether the transmission performance of various information flows could meet comprehensive requirements of traffic safety and delay tolerance. This paper proposes a novel downlink scheduling strategy for traffic communication system based on TD-LTE technology, which can perform two classification mappings for various information flows in the eNodeB: firstly, associate every information flow packet with traffic safety importance weight according to its relevance to the traffic safety; secondly, associate every traffic information flow with service type importance weight according to its quality of service (QoS) requirements. Once the connection is established, at every scheduling moment, scheduler would decide the scheduling order of all buffers' head of line packets periodically according to the instant value of scheduling importance weight function, which calculated by the proposed algorithm. From different scenario simulations, it can be verified that the proposed algorithm can provide superior differentiated transmission service and reliable QoS guarantee to information flows with different traffic safety levels and service types, which is more suitable for traffic transportation environment compared with the existing popularity PF algorithm. With the limited wireless resource, information flow closed related to traffic safety will always obtain priority scheduling right timely, which can help the passengers' journey more safe. Moreover, the proposed algorithm cannot only obtain good flow throughput and user fairness which are almost equal to those of the PF algorithm without significant differences, but also provide better realtime transmission guarantee to realtime information flow.

  15. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  16. Maintenance program decision-making utilizing crash data.

    Science.gov (United States)

    2013-07-01

    This document describes methods that may be used by UDOT Maintenance personnel to improve highway safety. Four programs have been recommended using crash data to make more informed decisions concerning maintenance programs as follows: : Snow & Ic...

  17. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  18. ECS: Efficient Communication Scheduling for Underwater Sensor Networks

    Directory of Open Access Journals (Sweden)

    Lu Hong

    2011-03-01

    Full Text Available TDMA protocols have attracted a lot of attention for underwater acoustic sensor networks (UWSNs, because of the unique characteristics of acoustic signal propagation such as great energy consumption in transmission, long propagation delay and long communication range. Previous TDMA protocols all allocated transmission time to nodes based on discrete time slots. This paper proposes an efficient continuous time scheduling TDMA protocol (ECS for UWSNs, including the continuous time based and sender oriented conflict analysis model, the transmission moment allocation algorithm and the distributed topology maintenance algorithm. Simulation results confirm that ECS improves network throughput by 20% on average, compared to existing MAC protocols.

  19. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  20. EHV transmission maintenance. A total asset strategy

    International Nuclear Information System (INIS)

    Bronsdon, J.A.N.

    1996-01-01

    For countries whose economies are rapidly expanding, the demand for power, and in particular electricity, is resulting in rapid expansions of the generation, transmission and distribution of electricity. This means that a new plant is being installed which, apart from some minor post commissioning problems, will be free from major maintenance for several years to come. Consequently, in such cases, maintenance is confined to basic annual shutdown checks and routine online monitoring. As equipment and plant age it is important to commence planning for additional maintenance over and above these basic annual checks; to monitor performance; to monitor faults and defects and to use that information to engineer out design faults, to influence current maintenance techniques and to influence future procurement specifications. Also, provided that sufficient information is available, informed decisions can be taken as to when a power plant should be decommissioned or refurbished. This process can be described as a total asset management strategy covering all decisions from procurement through to commissioning, ongoing maintenance, refurbishment, decommissioning and reappraisal of specifications for future procurement. Based upon the author's experience within the United Kingdom Electricity Supply industry, a total asset strategy will be proposed for EHV transmission plant that will optimise current and future expenditure while maximizing reliability and minimising downtime. 1 ref., 5 figs

  1. Work-in-progress report on maintenance good practices for motors in nuclear power generating stations - Part 2

    International Nuclear Information System (INIS)

    Eckstein, E.R.; Hall, A.R.; Kasper, S.; Smith, P.R.; Subudhi, M.

    1988-01-01

    Motor maintenance is addressed by a variety of industry standards, utility procedures and manufacture's instructions, as well as by recently published assessments of nuclear and non-nuclear operating experience and motor reliability data. This experience supports the premise that motor failure rates are in large part related to application stress factors such as operating time, environmental factors and vibration. Due to the large number of critical motors installed in a nuclear generating station, additional considerations are necessary to effectively schedule their preventive maintenance activities. Therefore, in this part, a method for prioritizing motor maintenance based on application stresses experienced by the motors is presented

  2. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  3. Multiobjective Optimization of Aircraft Maintenance in Thailand Using Goal Programming: A Decision-Support Model

    Directory of Open Access Journals (Sweden)

    Yuttapong Pleumpirom

    2012-01-01

    Full Text Available The purpose of this paper is to develop the multiobjective optimization model in order to evaluate suppliers for aircraft maintenance tasks, using goal programming. The authors have developed a two-step process. The model will firstly be used as a decision-support tool for managing demand, by using aircraft and flight schedules to evaluate and generate aircraft-maintenance requirements, including spare-part lists. Secondly, they develop a multiobjective optimization model by minimizing cost, minimizing lead time, and maximizing the quality under various constraints in the model. Finally, the model is implemented in the actual airline's case.

  4. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  5. Hydrocortisone accelerates the decay of iconic memory traces: on the modulation of executive and stimulus-driven constituents of sensory information maintenance.

    Science.gov (United States)

    Miller, Robert; Weckesser, Lisa J; Smolka, Michael N; Kirschbaum, Clemens; Plessow, Franziska

    2015-03-01

    A substantial amount of research documents the impact of glucocorticoids on higher-order cognitive functioning. By contrast, surprisingly little is known about the susceptibility of basic sensory processes to glucocorticoid exposure given that the glucocorticoid receptor density in the human visual cortex exceeds those observed in prefrontal and most hippocampal brain regions. As executive tasks also rely on these sensory processes, the present study investigates the impact of glucocorticoid exposure on different performance parameters characterizing the maintenance and transfer of sensory information from iconic memory (IM; the sensory buffer of the visual system) to working memory (WM). Using a crossover factorial design, we administered one out of three doses of hydrocortisone (0.06, 0.12, or 0.24mg/kg bodyweight) and a placebo to 18 healthy young men. Thereafter participants performed a partial report task, which was used to assess their individual ability to process sensory information. Blood samples were concurrently drawn to determine free and total cortisol concentrations. The compiled pharmacokinetic and psychophysical data demonstrates that free cortisol specifically accelerated the decay of sensory information (r=0.46) without significantly affecting the selective information transfer from IM to WM or the capacity limit of WM. Specifically, nonparametric regression revealed a sigmoid dose-response relationship between free cortisol levels during the testing period and the IM decay rates. Our findings highlight that glucocorticoid exposure may not only impact on the recruitment of top-down control for an active maintenance of sensory information, but alter their passive (stimulus-driven) maintenance thereby changing the availability of information prior to subsequent executive processing. Copyright © 2014 Elsevier Ltd. All rights reserved.

  6. A choice function hyper-heuristic framework for the allocation of maintenance tasks in Danish railways

    DEFF Research Database (Denmark)

    Pour, Shahrzad M.; Drake, John H.; Burke, Edmund K.

    2017-01-01

    A new signalling system in Denmark aims at ensuring fast and reliable train operations, however imposes very strict time limits on recovery plans in the event of failure. As a result, it is necessary to develop a new approach to the entire maintenance scheduling process. In the largest region of ...

  7. A Field Study of Scale Economies in Software Maintenance

    OpenAIRE

    Rajiv D. Banker; Sandra A. Slaughter

    1997-01-01

    Software maintenance is a major concern for organizations. Productivity gains in software maintenance can enable redeployment of Information Systems resources to other activities. Thus, it is important to understand how software maintenance productivity can be improved. In this study, we investigate the relationship between project size and software maintenance productivity. We explore scale economies in software maintenance by examining a number of software enhancement projects at a large fi...

  8. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH.

    Science.gov (United States)

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-04-16

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  9. A perspective on risk informed regulation and the maintenance rule

    International Nuclear Information System (INIS)

    In, Young H.

    2006-01-01

    programs: the risk-informed regulation and the maintenance rule, with some references to the much publicized equipment reliability program

  10. Streaming system scheduling for Xeon Phi

    OpenAIRE

    Faltín, Tomáš

    2017-01-01

    Task scheduling in operating system area is a well-known problem on traditional system architectures (NUMA, SMP). Unfortunately, it does not perform well on emerging many-core architectures, especially on Intel Xeon Phi. We collected all publicly available information about the architecture of Xeon Phi. After that, we benchmarked the Xeon Phi in order to find the missing information about its architecture. We focused especially on the information about cores and memory controllers. These are ...

  11. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  12. Maintenance risk management in Dayabay nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Tong Jiejuan

    2005-01-01

    The importance of proper maintenance to safe and reliable nuclear plant operation has long been recognized by the nuclear utility and regulatory body. This paper presents a process of maintenance risk management developed for a Chinese Nuclear Power Plant (NPP). The process includes three phases: (I) long term maintenance plan risk management, (II) monthly maintenance plan risk management, and (III) detailed risk management for high risk configuration. A risk matrix is developed for phase I whose purpose is to provide a rough guide for risk management in the making of the annual maintenance plan. For Phase II and Phase III, a software tool named Maintenance- Risk-Monitor is developed based on the internal initiating event, level 1 PSA model. The results of Phase II are the risk information of the all plant configurations caused by the unavailability of the components included the monthly maintenance plan. When the increase of core damage frequency (CDF) or the incremental core damage probability (ICDP) of a configuration is higher than the corresponding thresholds, Phase III is needed for this high risk configuration to get the useful information such as risk-importance components, human actions and initial events, from which appropriate preventive measurements could be derived. It is hoped that the provided process of maintenance risk management, together with the developed software tool, could facilitate the maintenance activities in the NPPs of China. (authors)

  13. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  14. Machine maintenance: the rules of the game

    CERN Multimedia

    Antonella Del Rosso

    2013-01-01

    GCO, GMIO, GSPO – ever heard of them? These acronyms stand for the “roles” that best practices identify as vital to successful maintenance management. CERN’s Maintenance Management Project (MMP) team is working with the technical departments to ensure that they implement these procedures when they deal with the maintenance of the collider and its injectors and infrastructure.   The participants of the workshop on asset and maintenance management (AMMW2013), which took place at CERN in November. Since its creation in 2012, CERN’s Maintenance Framework Implementation Office (MFIO) has been promoting the deployment of harmonised maintenance management methods across the BE, GS, EN and TE Departments. “The definition and identification of the Group Coding Officers (GCO), Group Maintenance Information Officers (GMIO) and Group Spare Part Officers (GSPO) are one of the best practices that should be adopted each time a maintenance programme...

  15. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  16. Using Modern Methodologies with Maintenance Software

    Science.gov (United States)

    Streiffert, Barbara A.; Francis, Laurie K.; Smith, Benjamin D.

    2014-01-01

    Jet Propulsion Laboratory uses multi-mission software produced by the Mission Planning and Sequencing (MPS) team to process, simulate, translate, and package the commands that are sent to a spacecraft. MPS works under the auspices of the Multi-Mission Ground Systems and Services (MGSS). This software consists of nineteen applications that are in maintenance. The MPS software is classified as either class B (mission critical) or class C (mission important). The scheduling of tasks is difficult because mission needs must be addressed prior to performing any other tasks and those needs often spring up unexpectedly. Keeping track of the tasks that everyone is working on is also difficult because each person is working on a different software component. Recently the group adopted the Scrum methodology for planning and scheduling tasks. Scrum is one of the newer methodologies typically used in agile development. In the Scrum development environment, teams pick their tasks that are to be completed within a sprint based on priority. The team specifies the sprint length usually a month or less. Scrum is typically used for new development of one application. In the Scrum methodology there is a scrum master who is a facilitator who tries to make sure that everything moves smoothly, a product owner who represents the user(s) of the software and the team. MPS is not the traditional environment for the Scrum methodology. MPS has many software applications in maintenance, team members who are working on disparate applications, many users, and is interruptible based on mission needs, issues and requirements. In order to use scrum, the methodology needed adaptation to MPS. Scrum was chosen because it is adaptable. This paper is about the development of the process for using scrum, a new development methodology, with a team that works on disparate interruptible tasks on multiple software applications.

  17. A review of e-maintenance capabilities and challenges

    OpenAIRE

    Adolfo Crespo Marquez; Benoit Iung

    2008-01-01

    Within the era of e-manufacturing and e-business, e-maintenance provides the opportunity for a new maintenance generation. E-maintenance integrates existing telemaintenance principles, with web-services and modern e-collaboration principles. Collaboration allows not only to share and exchange information but also knowledge and (e)-intelligence. This paper outlines the basic capabilities provided by e-maintenance to companies as well as describes emerging challenges to benefit from these new o...

  18. Research on operation and maintenance support system adaptive to human recognition and understanding in human-centered plant

    International Nuclear Information System (INIS)

    Numano, Masayoshi; Matsuoka, Takeshi; Mitomo, N.

    2004-01-01

    As a human-centered plant, advanced nuclear power plant needs appropriate role sharing between human and mobile intelligent agents. Human-machine cooperation for plant operation and maintenance activities is also required with an advanced interface. Plant's maintenance is programmed using mobile robots working under the radiation environments instead of human beings. Operation and maintenance support system adaptive to human recognition and understanding should be developed to establish adequate human and machine interface so as to induce human capabilities to the full and enable human to take responsibility for plan's operation. Plant's operation and maintenance can be cooperative activities between human and intelligent automonous agents having surveillance and control functions. Infrastructure of multi-agent simulation system for the support system has been investigated and developed based on work plans derived from the scheduler. (T. Tanaka)

  19. Maintenance of Structures, Systems and Components of the RSG-GAS Reactor as an Implementation of BAPETEN Regulation No. 5 Year 2011

    International Nuclear Information System (INIS)

    Aep Saepudin Catur; Dede Solehudin Fauzi; Djunaidi

    2012-01-01

    Maintenance activities for structures, systems and components of the reactor, consider prerequisites for the operation of the non power reactor. This activity is intended to ensure that the structures, systems and components function properly. Implementation of reactor maintenance carried out starting from programs establishment, scheduling, maintenance accomplishment and maintenance report. This paper will describe the implementation of reactor maintenance non power as required by BAPETEN regulation no.5, year 2011. By understanding correctly of this regulation, it is expected that maintenance activity of structures, systems and components of the reactor can be successfully performed. The RSG-GAS reactor has implemented various types of reactor maintenance based on BAPETEN regulation no.5 year 2011 properly. As a result failure of the structures, systems and components of the reactor can be minimized then they can be kept reliable. (author)

  20. Performance-based maintenance of gas turbines for reliable control of degraded power systems

    Science.gov (United States)

    Mo, Huadong; Sansavini, Giovanni; Xie, Min

    2018-03-01

    maintenance costs as compared to CBM and pre-scheduled maintenance.

  1. On condition based maintenance policy

    Directory of Open Access Journals (Sweden)

    Jong-Ho Shin

    2015-04-01

    Full Text Available In the case of a high-valuable asset, the Operation and Maintenance (O&M phase requires heavy charges and more efforts than the installation (construction phase, because it has long usage life and any accident of an asset during this period causes catastrophic damage to an industry. Recently, with the advent of emerging Information Communication Technologies (ICTs, we can get the visibility of asset status information during its usage period. It gives us new challenging issues for improving the efficiency of asset operations. One issue is to implement the Condition-Based Maintenance (CBM approach that makes a diagnosis of the asset status based on wire or wireless monitored data, predicts the assets abnormality, and executes suitable maintenance actions such as repair and replacement before serious problems happen. In this study, we have addressed several aspects of CBM approach: definition, related international standards, procedure, and techniques with the introduction of some relevant case studies that we have carried out.

  2. 29 CFR 1952.211 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual developed by July, 1973; (c) Management Information System, December, 1975; (d) Training in compliance...

  3. A review of e-maintenance capabilities and challenges

    Directory of Open Access Journals (Sweden)

    Adolfo Crespo Marquez

    2008-02-01

    Full Text Available Within the era of e-manufacturing and e-business, e-maintenance provides the opportunity for a new maintenance generation. E-maintenance integrates existing telemaintenance principles, with web-services and modern e-collaboration principles. Collaboration allows not only to share and exchange information but also knowledge and (e-intelligence. This paper outlines the basic capabilities provided by e-maintenance to companies as well as describes emerging challenges to benefit from these new operational improvement opportunities

  4. Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle

    Science.gov (United States)

    Patterson-Hine, Ann; Deb, Somnath; Kulkarni, Deepak; Wang, Yao; Lau, Sonie (Technical Monitor)

    1998-01-01

    The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.

  5. Development of standardized component\\0x2010based equipment specifications and transition plan into a predictive maintenance strategy : final report.

    Science.gov (United States)

    2015-12-01

    This project investigated INDOT equipment records and equipment industry standards to produce standard equipment specifications : and a predictive maintenance schedule for the more than 1100 single and tandem axle trucks in use at INDOT. The research...

  6. Simultaneous optimization of planning and scheduling in an oil refinery

    NARCIS (Netherlands)

    Zondervan, E.; van Boekel, T.P.J.; Fransoo, J.C.; Haan, de A.B.; Postikopoulos, E.N.; Georgiadis, M.C.; Kokossis, A.

    2011-01-01

    In earlier work we have developed and tested a scheduling model [1] in the AIMMS software. In this follow-up contribution we will develop a planning model. Next we will identify the information flow between scheduling model and the planning model. Lastly we will integrate the two models in a

  7. Development of an intellectual maintenance management system. Development of trouble detection and troubleshooting evaluation system

    International Nuclear Information System (INIS)

    Suda, Kazunori; Yoshikawa, Shinji; Tani, Satoshi

    1998-03-01

    Many research activities are conducted to enhance cost performance and safety of nuclear power plants operation and maintenance. Concept of autonomous operating system to equal the role of operators and of maintenance personnel with artificial intelligence and autonomous robots has been developed. An intellectual maintenance management system has been developed to be equipped with decision making functions of maintenance personnel. The intellectual maintenance management system is in charge of maintenance function of an autonomous plant, which consists of plant-wide monitoring, evaluation of component integrity, and scheduling of maintenance activities. In other words, this system should be equipped with preventive maintenance and corrective maintenance functions those are currently loaded on personnel. In this report, we discussed condition monitoring maintenance in the preventive maintenance. We also reported a sensor validation system development for machinery condition monitoring and diagnosis. We adopted distributed and cooperative system construction technique, which is expected recently in applications to large-scale plants. This system has inter-agent communication function for signal transmission and reception among distributed physics models of machineries. The system has been constructed for water/steam system of the LMFBR power plant. The system has been validated to be capable of cooperative sensor validation by the distributed set of agents, with quantitative indication of sensor deviation based on a newly developed fuzzy algorithm with inter-agent cooperation. The derived reference parameter value from the inter-agent evaluations also stands for the alternative measurement to the malfunctioned sensor. (author)

  8. Integrated Technical Information for the Air Logistics Center: Enhancing Maintenance Technician Task Performance

    National Research Council Canada - National Science Library

    Mitta, Deborah

    1998-01-01

    This technical paper documents the final results of an analysis of the task environment under which depot maintenance technicians perform their jobs--specifically, programmed depot maintenance (PDM) for F-15 aircraft...

  9. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  10. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH

    Directory of Open Access Journals (Sweden)

    Sukho Oh

    2018-04-01

    Full Text Available Time Slotted Channel Hopping (TSCH is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  11. 29 CFR 1952.201 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Retraining of present occupational safety and health personnel during March-May 1973; (b... legislation, August 1, 1973; (d) Regulations on variances, August 1973; (e) Management information system...

  12. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  13. Design of preventive maintenance system using the reliability engineering and maintenance value stream mapping methods in PT. XYZ

    Science.gov (United States)

    Sembiring, N.; Panjaitan, N.; Angelita, S.

    2018-02-01

    PT. XYZ is a company owned by non-governmental organizations engaged in the field of production of rubber processing becoming crumb rubber. Part of the production is supported by some of machines and interacting equipment to achieve optimal productivity. Types of the machine that are used in the production process are Conveyor Breaker, Breaker, Rolling Pin, Hammer Mill, Mill Roll, Conveyor, Shredder Crumb, and Dryer. Maintenance system in PT. XYZ is corrective maintenance i.e. repairing or replacing the engine components after the crash on the machine. Replacement of engine components on corrective maintenance causes the machine to stop operating during the production process is in progress. The result is in the loss of production time due to the operator must replace the damaged engine components. The loss of production time can impact on the production targets which were not reached and lead to high loss costs. The cost for all components is Rp. 4.088.514.505. This cost is really high just for maintaining a Mill Roll Machine. Therefore PT. XYZ is needed to do preventive maintenance i.e. scheduling engine components and improving maintenance efficiency. The used methods are Reliability Engineering and Maintenance Value Stream Mapping (MVSM). The needed data in this research are the interval of time damage to engine components, opportunity cost, labor cost, component cost, corrective repair time, preventive repair time, Mean Time To Opportunity (MTTO), Mean Time To Repair (MTTR), and Mean Time To Yield (MTTY). In this research, the critical components of Mill Roll machine are Spier, Bushing, Bearing, Coupling and Roll. Determination of damage distribution, reliability, MTTF, cost of failure, cost of preventive, current state map, and future state map are done so that the replacement time for each critical component with the lowest maintenance cost and preparation of Standard Operation Procedure (SOP) are developed. For the critical component that has been

  14. 29 CFR 2201.10 - Maintenance of statistics.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Maintenance of statistics. 2201.10 Section 2201.10 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION REGULATIONS IMPLEMENTING THE FREEDOM OF INFORMATION ACT § 2201.10 Maintenance of statistics. (a) The FOIA Disclosure...

  15. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  16. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  17. Effects of load and maintenance duration on the time course of information encoding and retrieval in working memory: from perceptual analysis to post-categorization processes.

    Science.gov (United States)

    Pinal, Diego; Zurrón, Montserrat; Díaz, Fernando

    2014-01-01

    information encoding, maintenance, and retrieval; these are supported by brain activity in a network of frontal, parietal and temporal regions. Manipulation of WM load and duration of the maintenance period can modulate this activity. Although such modulations have been widely studied using the event-related potentials (ERP) technique, a precise description of the time course of brain activity during encoding and retrieval is still required. Here, we used this technique and principal component analysis to assess the time course of brain activity during encoding and retrieval in a delayed match to sample task. We also investigated the effects of memory load and duration of the maintenance period on ERP activity. Brain activity was similar during information encoding and retrieval and comprised six temporal factors, which closely matched the latency and scalp distribution of some ERP components: P1, N1, P2, N2, P300, and a slow wave. Changes in memory load modulated task performance and yielded variations in frontal lobe activation. Moreover, the P300 amplitude was smaller in the high than in the low load condition during encoding and retrieval. Conversely, the slow wave amplitude was higher in the high than in the low load condition during encoding, and the same was true for the N2 amplitude during retrieval. Thus, during encoding, memory load appears to modulate the processing resources for context updating and post-categorization processes, and during retrieval it modulates resources for stimulus classification and context updating. Besides, despite the lack of differences in task performance related to duration of the maintenance period, larger N2 amplitude and stronger activation of the left temporal lobe after long than after short maintenance periods were found during information retrieval. Thus, results regarding the duration of maintenance period were complex, and future work is required to test the time-based decay theory predictions.

  18. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  19. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  20. Void Fraction Instrument operation and maintenance manual

    International Nuclear Information System (INIS)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

    1994-09-01

    This Operations and Maintenance Manual (O ampersand MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document

  1. Taipower plans to cut O and M costs [reactor maintenance management

    International Nuclear Information System (INIS)

    Tsui, S.J.

    1989-01-01

    Taipower aims to reduce operation and maintenance costs at its three BWRs, as well as the time devoted by plant personnel to O and M paper work, by ensuring that maintenance and spare-parts management is systematic and well documented. It is currently developing an on-line maintenance information system, known as the Maintenance Management Computerization System (MMCS), which can be accessed from any of Taipower's plants. MMCS is designed to be an on-line interactive multiple-user system through which the authorized user has immediate access to maintenance information. It will be used for preventive and corrective maintenance, surveillance tests, tagging, document control, instrument calibration and refuelling outage management. The system is simple to operate, using pull-down menus and standard text. (author)

  2. Trends and Perspective in Industrial Maintenance Management

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    With increased global competition for manufacturing, many companies are seeking ways to gain competitative advanges with respect to cost, service, quality and on-time deliveries. The role that effective maintenance management plays in contributing to overall organizational productivity has received...... increased attention. Trends and perspective in industrial maintenance are presented. The result of benchmarking studies from Scandinavia and United States are also presented and compared. Case studies that examine maintenance methods, knowledge, organization and information systems in three Danish...

  3. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  4. Results of calendar year 1995 Well Inspection and Maintenance Program Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    McMaster, B.W.

    1996-07-01

    This document is a compendium of results of the 1995 Monitor Well Inspection and Maintenance Program at the US Department of Energy's Oak Ridge Y-12 Plant. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the effective longevity of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant from August through December 1995

  5. Baseline development, economic risk, and schedule risk: An integrated approach

    International Nuclear Information System (INIS)

    Tonkinson, J.A.

    1994-01-01

    The economic and schedule risks of Environmental Restoration (ER) projects are commonly analyzed toward the end of the baseline development process. Risk analysis is usually performed as the final element of the scheduling or estimating processes for the purpose of establishing cost and schedule contingency. However, there is an opportunity for earlier assessment of risks, during development of the technical scope and Work Breakdown Structure (WBS). Integrating the processes of risk management and baselining provides for early incorporation of feedback regarding schedule and cost risk into the proposed scope of work. Much of the information necessary to perform risk analysis becomes available during development of the technical baseline, as the scope of work and WBS are being defined. The analysis of risk can actually be initiated early on during development of the technical baseline and continue throughout development of the complete project baseline. Indeed, best business practices suggest that information crucial to the success of a project be analyzed and incorporated into project planning as soon as it is available and usable

  6. Augmented reality application utility for aviation maintenance work instruction

    Science.gov (United States)

    Pourcho, John Bryan

    Current aviation maintenance work instructions do not display information effectively enough to prevent costly errors and safety concerns. Aircraft are complex assemblies of highly interrelated components that confound troubleshooting and can make the maintenance procedure difficult (Drury & Gramopadhye, 2001). The sophisticated nature of aircraft maintenance necessitates a revolutionized training intervention for aviation maintenance technicians (United States General Accounting Office, 2003). Quite simply, the paper based job task cards fall short of offering rapid access to technical data and the system or component visualization necessary for working on complex integrated aircraft systems. Possible solutions to this problem include upgraded standards for paper based task cards and the use of integrated 3D product definition used on various mobile platforms (Ropp, Thomas, Lee, Broyles, Lewin, Andreychek, & Nicol, 2013). Previous studies have shown that incorporation of 3D graphics in work instructions allow the user to more efficiently and accurately interpret maintenance information (Jackson & Batstone, 2008). For aircraft maintenance workers, the use of mobile 3D model-based task cards could make current paper task card standards obsolete with their ability to deliver relevant, synchronized information to and from the hangar. Unlike previous versions of 3D model-based definition task cards and paper task cards, which are currently used in the maintenance industry, 3D model based definition task cards have the potential to be more mobile and accessible. Utilizing augmented reality applications on mobile devices to seamlessly deliver 3D product definition on mobile devices could increase the efficiency, accuracy, and reduce the mental workload for technicians when performing maintenance tasks (Macchiarella, 2004). This proposal will serve as a literary review of the aviation maintenance industry, the spatial ability of maintenance technicians, and benefits of

  7. Breaker Maintenance: Volume 3, Molded-Case circuit breakers

    International Nuclear Information System (INIS)

    Davis, E.L.; Funk, D.L.

    1991-09-01

    Modeled-case circuit breakers (MCCBs) provide power and circuit protection in nuclear plant electrical distribution systems. Thus, their proper operation is essential to the safe and reliable operation of plant electrical distribution systems. This guide for both nuclear and non-nuclear power generating facilities will help improve the maintenance and reliability of MCCBs. The authors developed this guide to establish a working-level understanding of hardware performance trends, reliability, and failure modes from which maintenance practices could be specified. The first step in preparing this guide was an in-depth review of available operating experience and failure data, which was obtained from nuclear information sources such as EPRI's Nuclear Maintenance Applications Center. In addition, they evaluated some nonnuclear reliability data. Next, they investigated current industry practices, including a review of manufacturer's recommendations and numerous industry standards. Finally, they used the collective information to develop programmatic recommendations and, where appropriate, detailed inspection and test guidance. This guide offers many recommendations applicable to MCCB maintenance, such as an engineering description of MCCBs and their operation; an overview of reliability and failure data; programmatic recommendations, including inspection and test periodicity; detailed inspection and test guidance; and corrective maintenance recommendations. Supplementary information includes an overview of industry standards, a discussion of regulatory issues, and sample data sheets. An evaluation of operating experience indicates that a maintenance program need not be overly complicated to detect the predominant failure modes associated with MCCBs. Those implementating an MCCB maintenance and testing program, however, must recognize the inherent limitations associated with field-testing of these devices. 42 refs., 17 figs., 7 tabs

  8. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  9. On line system monitoring and analysis for efficient maintenance management [Paper No.: I-10

    International Nuclear Information System (INIS)

    Verma, R.M.P.

    1981-01-01

    Continuously operating chemical plants and nuclear reactors with huge investments cannot afford unscheduled shut down, costly down time, undesired exposure of people to radiation and high cost of inventory. To obtain cost effectiveness in terms of increased plant availability with increased quality, safety and reliability of plant operations a good maintenance system is required. A preventive maintenance programme, though successful to a greater extent, has got the limitations of being based upon elapsed time, subjective approach or statistical data. Hence, maintenance action is mistimed. Preventive maintenance can become very effective if rational and scientific data on equipment under working conditions are available. It can be achieved through on-line predictive instruments like sound level and vibration analyzers, probologs, corrosmeters, strain gages, thermographic infrared sensors, on-line ferrographs, chromatographs, acoustic emission, eddy current ultrasonic and wireless sensors etc. Instruments help maintenance engineer to diagnose, inspect, monitor, and help in forecasting failures and scheduling the frequencies optimally for overhauls, replacements, lubrication etc. They are also helpful in establishing work load, manpower, resource planning and inventory control. This paper discusses real time computer based system as well as conventional instruments and techniques. (author)

  10. Methods for Calculating Frequency of Maintenance of Complex Information Security System Based on Dynamics of Its Reliability

    Science.gov (United States)

    Varlataya, S. K.; Evdokimov, V. E.; Urzov, A. Y.

    2017-11-01

    This article describes a process of calculating a certain complex information security system (CISS) reliability using the example of the technospheric security management model as well as ability to determine the frequency of its maintenance using the system reliability parameter which allows one to assess man-made risks and to forecast natural and man-made emergencies. The relevance of this article is explained by the fact the CISS reliability is closely related to information security (IS) risks. Since reliability (or resiliency) is a probabilistic characteristic of the system showing the possibility of its failure (and as a consequence - threats to the protected information assets emergence), it is seen as a component of the overall IS risk in the system. As it is known, there is a certain acceptable level of IS risk assigned by experts for a particular information system; in case of reliability being a risk-forming factor maintaining an acceptable risk level should be carried out by the routine analysis of the condition of CISS and its elements and their timely service. The article presents a reliability parameter calculation for the CISS with a mixed type of element connection, a formula of the dynamics of such system reliability is written. The chart of CISS reliability change is a S-shaped curve which can be divided into 3 periods: almost invariable high level of reliability, uniform reliability reduction, almost invariable low level of reliability. Setting the minimum acceptable level of reliability, the graph (or formula) can be used to determine the period of time during which the system would meet requirements. Ideally, this period should not be longer than the first period of the graph. Thus, the proposed method of calculating the CISS maintenance frequency helps to solve a voluminous and critical task of the information assets risk management.

  11. 29 CFR 1952.341 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Developmental schedule. 1952.341 Section 1952.341 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... State Legislature January 1975 and to become effective by May 1, 1975. (d) Management Information System...

  12. On Multiple Users Scheduling Using Superposition Coding over Rayleigh Fading Channels

    KAUST Repository

    Zafar, Ammar

    2013-02-20

    In this letter, numerical results are provided to analyze the gains of multiple users scheduling via superposition coding with successive interference cancellation in comparison with the conventional single user scheduling in Rayleigh blockfading broadcast channels. The information-theoretic optimal power, rate and decoding order allocation for the superposition coding scheme are considered and the corresponding histogram for the optimal number of scheduled users is evaluated. Results show that at optimality there is a high probability that only two or three users are scheduled per channel transmission block. Numerical results for the gains of multiple users scheduling in terms of the long term throughput under hard and proportional fairness as well as for fixed merit weights for the users are also provided. These results show that the performance gain of multiple users scheduling over single user scheduling increases when the total number of users in the network increases, and it can exceed 10% for high number of users

  13. Proficiency evaluation of maintenance personnel: Training equivalency determination

    International Nuclear Information System (INIS)

    Price, W.J.

    1991-01-01

    The nuclear industry has recognized the importance of safe, quality, productive maintenance practices and has taken a number of initiatives that have generally improved maintenance programs. Because proficient maintenance practices are critical to plant safety and reliability, most plants have also recognized the need for reliable, valid testing techniques that demonstrate and assure the competence of their maintenance personnel. Until now, resource demands were too great to develop in-plant testing programs. In the past, maintenance supervisors have exempted personnel from training, using informal judgment of the employees' previous training and experience and informal observation of the employee on the job. While this procedure may have some degree of validity, it fails to provide the documentation for training equivalency that is required to satisfy the US Nuclear Regulatory Commission (NRC) regulations and Institute of Nuclear Power Operations (INPO) guidelines. To assess and demonstrate the proficiency levels of personnel, Calvert Cliffs needed to establish an objective, reliable, time-saving, and valid system to evaluate the competency levels of personnel. This was done in a joint effort with the Electric Power Research Institute

  14. Missed deadline notification in best-effort schedulers

    Science.gov (United States)

    Banachowski, Scott A.; Wu, Joel; Brandt, Scott A.

    2003-12-01

    It is common to run multimedia and other periodic, soft real-time applications on general-purpose computer systems. These systems use best-effort scheduling algorithms that cannot guarantee applications will receive responsive scheduling to meet deadline or timing requirements. We present a simple mechanism called Missed Deadline Notification (MDN) that allows applications to notify the system when they do not receive their desired level of responsiveness. Consisting of a single system call with no arguments, this simple interface allows the operating system to provide better support for soft real-time applications without any a priori information about their timing or resource needs. We implemented MDN in three different schedulers: Linux, BEST, and BeRate. We describe these implementations and their performance when running real-time applications and discuss policies to prevent applications from abusing MDN to gain extra resources.

  15. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  16. 20 CFR 402.165 - Fee schedule.

    Science.gov (United States)

    2010-04-01

    ... requester for the services rendered. (i) Fee for copies of printed materials. When extra copies of printed... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Fee schedule. 402.165 Section 402.165 Employees' Benefits SOCIAL SECURITY ADMINISTRATION AVAILABILITY OF INFORMATION AND RECORDS TO THE PUBLIC...

  17. Diagnostic aid and maintenance at the La Hague reprocessing plants

    International Nuclear Information System (INIS)

    Bern, J.B.; Chabert, J.

    1989-01-01

    The Cogema plant at La Hague is the world's leading nuclear fuel reprocessing plant. A major extension program was initiated in 1980. It includes the construction of a new 800 t/year capacity plant (UP3), to be commissioned in 1989, and the doubling of the capacity of the present plant (UP2 800) scheduled to go on stream in 1992. On the occasion of this huge capital investment, an overall assessment was made of the operating and maintenance systems of the site. The general objective was to achieve maximum productivity and availability, in view of: - the extreme importance of safety for the protection of workers and the environment, - the high level of automation required by the complexity of the process, - the inaccessibility of the nuclear equipment, the scale of the investment. To achieve this goal, a set of diagnostic and maintenance aid systems were developed and installed. A general site data network serves to link these systems and to distribute the corresponding data to the different users. This paper describes these different systems, presents the functionalities of the network and demonstrates the sequencing of the operations in a typical maintenance application

  18. Generation and utilization of knowledge concerning state change propagation using plant design information

    International Nuclear Information System (INIS)

    Nishizawa, Yasuo; Nagaoka, Yukio; Sato, Takao; Matsuki, Tsutomu.

    1992-01-01

    A method of knowledge generation and utilization using design information is described. This method is used to generate rules concerned with propagation of state change in a plant due to equipment manipulation or anomaly. The rules describe macroscopic behavior of plant subsystems consisting of many devices, and are used for high speed information processing in expert systems for plant diagnosis, maintenance, etc. Knowledge generation is comprised of two steps. In the first step, the changes of state values are propagated according to connectivity between devices and the input-output relationships of the devices. In the second step, the input change, output change of plant subsystems, and other information are edited according to the results of state change propagation, and rules for state change propagation are generated. By using these rules, the simulation of state change propagation can be accelerated about 10 times compared with the case of device level propagation. The method of knowledge generation has been applied to the inference system in a maintenance work scheduling system and a new-type expert system was realized. It grows by generating rules for problem solving and by expanding its knowledge base by itself. (author)

  19. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  20. On the concept of e-maintenance: Review and current research

    International Nuclear Information System (INIS)

    Muller, Alexandre; Crespo Marquez, Adolfo; Iung, Benoit

    2008-01-01

    The importance of the maintenance function has increased because of its role in keeping and improving system availability and safety, as well as product quality. To support this role, the development of the communication and information technologies has allowed the emergence of the concept of e-maintenance. Within the era of e-manufacturing and e-business, e-maintenance provides the opportunity for a new maintenance generation. As we will discuss later in this paper, e-maintenance integrates existing telemaintenance principles, with Web services and modern e-collaboration principles. Collaboration allows to share and exchange not only information but also knowledge and (e)-intelligence. By means of a collaborative environment, pertinent knowledge and intelligence become available and usable at the right place and time, in order to facilitate reaching the best maintenance decisions. This paper outlines the basic ideas within the e-maintenance concept and then provides an overview of the current research and challenges in this emerging field. An underlying objective is to identify the industrial/academic actors involved in the technological, organizational or management issues related to the development of e-maintenance. Today, this heterogeneous community has to be federated in order to bring up e-maintenance as a new scientific discipline

  1. Maintenance, surveillance and in-service inspection in nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2002-01-01

    Effective maintenance, surveillance and in-service inspection (MS and I) are essential for the safe operation of a nuclear power plant. The objective of this Safety Guide is to provide recommendations and guidance for MS and I activities to ensure that SSCs important to safety are available to perform their functions in accordance with the assumptions and intent of the design. This Safety Guide covers the organizational and procedural aspects of MS and I. However, it does not give detailed technical advice in relation to particular items of plant equipment, nor does it cover inspections made for and/or by the regulatory body. This Safety Guide provides recommendations and guidance for preventive and remedial measures, including testing, surveillance and in-service inspection, that are necessary to ensure that all plant structures, systems and components (SSCs) important to safety are capable of performing as intended. This Safety Guide covers measures for fulfilling the organizational and administrative requirements for: establishing and implementing schedules for preventive and predictive maintenance, repairing defective plant items, selecting and training personnel, providing related facilities and equipment, procuring stores and spare parts, and generating, collecting and retaining maintenance records for establishing and implementing an adequate feedback system for information on maintenance. MS and I should be subject to quality assurance in relation to all aspects important to safety. Quality assurance has been dealt with in detail in other IAEA safety standards and is covered here only in specific instances, for emphasis. In Section 2, a concept of MS and I is presented and the interrelationship between maintenance, surveillance and inspection is discussed. Section 3 concerns the functions and responsibilities of different organizations involved in MS and I activities. Section 4 provides recommendations and guidance on such organizational aspects as

  2. Maintenance, surveillance and in-service inspection in nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    Effective maintenance, surveillance and in-service inspection (MS and I) are essential for the safe operation of a nuclear power plant. The objective of this Safety Guide is to provide recommendations and guidance for MS and I activities to ensure that SSCs important to safety are available to perform their functions in accordance with the assumptions and intent of the design. This Safety Guide covers the organizational and procedural aspects of MS and I. However, it does not give detailed technical advice in relation to particular items of plant equipment, nor does it cover inspections made for and/or by the regulatory body. This Safety Guide provides recommendations and guidance for preventive and remedial measures, including testing, surveillance and in-service inspection, that are necessary to ensure that all plant structures, systems and components (SSCs) important to safety are capable of performing as intended. This Safety Guide covers measures for fulfilling the organizational and administrative requirements for: establishing and implementing schedules for preventive and predictive maintenance, repairing defective plant items, selecting and training personnel, providing related facilities and equipment, procuring stores and spare parts, and generating, collecting and retaining maintenance records for establishing and implementing an adequate feedback system for information on maintenance. MS and I should be subject to quality assurance in relation to all aspects important to safety. Quality assurance has been dealt with in detail in other IAEA safety standards and is covered here only in specific instances, for emphasis. In Section 2, a concept of MS and I is presented and the interrelationship between maintenance, surveillance and inspection is discussed. Section 3 concerns the functions and responsibilities of different organizations involved in MS and I activities. Section 4 provides recommendations and guidance on such organizational aspects as

  3. Reducing Downlink Signaling Traffic in Wireless Systems Using Mobile-Assisted Scheduling

    OpenAIRE

    Moosavi, Reza; Larsson, Erik G.

    2010-01-01

    We present an idea to reduce the part of the downlink signaling traffic in wireless multiple access systems that contains scheduling information. The theoretical basis of the scheme is that the scheduling decisions made by the base station are correlated with the CSI reports from the mobiles. This correlation can be exploited by the source coding scheme that is used to compress the scheduling maps before they are sent to the mobiles. In the proposed scheme, this idea is implemented by letting...

  4. Computer-aided resource planning and scheduling for radiological services

    Science.gov (United States)

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  5. Corrosion Sensor Development for Condition-Based Maintenance of Aircraft

    Directory of Open Access Journals (Sweden)

    Gino Rinaldi

    2012-01-01

    Full Text Available Aircraft routinely operate in atmospheric environments that, over time, will impact their structural integrity. Material protection and selection schemes notwithstanding, recurrent exposure to chlorides, pollution, temperature gradients, and moisture provide the necessary electrochemical conditions for the development and profusion of corrosion in aircraft structures. For aircraft operators, this becomes an important safety matter as corrosion found in a given aircraft must be assumed to be present in all of that type of aircraft. This safety protocol and its associated unscheduled maintenance requirement drive up the operational costs of the fleet and limit the availability of the aircraft. Hence, there is an opportunity at present for developing novel sensing technologies and schemes to aid in shifting time-based maintenance schedules towards condition-based maintenance procedures. In this work, part of the ongoing development of a multiparameter integrated corrosion sensor is presented. It consists of carbon nanotube/polyaniline polymer sensors and commercial-off-the-shelf sensors. It is being developed primarily for monitoring environmental and material factors for the purpose of providing a means to more accurately assess the structural integrity of aerospace aluminium alloys through fusion of multiparameter sensor data. Preliminary experimental test results are presented for chloride ion concentration, hydrogen gas evolution, humidity variations, and material degradation.

  6. FOREST HARVEST SCHEDULING PLAN INTEGRATED TO THE ROAD NETWORK

    Directory of Open Access Journals (Sweden)

    Pedro Henrique Belavenutti Martins da Silva

    2016-03-01

    Full Text Available In industrial forest plantations, the spatial distribution of management units for harvest scheduling influences the timber production cost and the non-renewable resources consumption, due to issues related to transport logistic. In this context, this research aimed to formulate Integer Linear Programming (ILP by means of the application of Floyd-Warshall network optimization algorithm to generate timber production routes, minimizing the production costs resulting from harvest activities and forest road maintenance. Then, scenarios were simulated considering different minimal harvest ages for Pinus spp. and Eucalyptus spp. stands. The planning horizon was five years with annual periodicity. The study area was 23,330 hectares of forests, located in Paraná state (southern Brazil. We compared the simulated scenarios according to the following parameter indicators: harvest income, building road network and the production unit cost. The decreasing of the minimal harvest age reduces the mean production of management units scheduled to be harvested, in other hand, it requires fewer roads to be built, and consequently increases the production unit cost. The solutions obtained by using ILP models presented an optimality gap lower than 0.1%.

  7. Modelling inspection policies for building maintenance.

    Science.gov (United States)

    Christer, A H

    1982-08-01

    A method of assessing the potential of an inspection maintenance policy as opposed to an existing breakdown maintenance policy for a building complex is developed. The method is based upon information likely to be available and specific subjective assessments which could be made available. Estimates of the expected number of defects identified at an inspection and the consequential cost saving are presented as functions of the inspection frequency.

  8. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  9. RA Reactor operation and maintenance (I-IX), Part II, Task 3.08/04; Pogon i odrzavanje reaktora RA (I-IX), II Deo, Zadatak 3.08/04

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    Repair and maintenance work of the RA reactor components and equipment was longer than planned due to the following reasons: chemical decontamination of the reactor heavy water system indispensable for maintenance of the heavy water pumps; findings of contamination origin changed the maintenance schedule; some construction materials of the heavy water pumps which caused contamination had to be removed; a number of the planned operations had to be performed under increase level of gamma radiation which increased the time needed for repair. This report covers detailed description of all the maintenance and repair work done from 25 Jan to 22 Apr 1963.

  10. Analysis and Enhancement of IEEE 802.15.4e DSME Beacon Scheduling Model

    Directory of Open Access Journals (Sweden)

    Kwang-il Hwang

    2014-01-01

    Full Text Available In order to construct a successful Internet of things (IoT, reliable network construction and maintenance in a sensor domain should be supported. However, IEEE 802.15.4, which is the most representative wireless standard for IoT, still has problems in constructing a large-scale sensor network, such as beacon collision. To overcome some problems in IEEE 802.15.4, the 15.4e task group proposed various different modes of operation. Particularly, the IEEE 802.15.4e deterministic and synchronous multichannel extension (DSME mode presents a novel scheduling model to solve beacon collision problems. However, the DSME model specified in the 15.4e draft does not present a concrete design model but a conceptual abstract model. Therefore, in this paper we introduce a DSME beacon scheduling model and present a concrete design model. Furthermore, validity and performance of DSME are evaluated through experiments. Based on experiment results, we analyze the problems and limitations of DSME, present solutions step by step, and finally propose an enhanced DSME beacon scheduling model. Through additional experiments, we prove the performance superiority of enhanced DSME.

  11. Establishing a predictive maintenance program at the Hanford Site

    International Nuclear Information System (INIS)

    Winslow, R.W.

    1994-05-01

    This document contains information about a new Predictive Maintenance Program being developed and implemented at the Hanford Reservation. Details of the document include: background on persons developing the program, history of predictive maintenance, implementation of new program, engineering task analysis, network development and new software, issues to be resolved, benefits expected, and appendix gives information about the symposium from which this paper is based

  12. Heuristic hybrid game approach for fleet condition-based maintenance planning

    International Nuclear Information System (INIS)

    Feng, Qiang; Bi, Xiong; Zhao, Xiujie; Chen, Yiran; Sun, Bo

    2017-01-01

    The condition-based maintenance (CBM) method is commonly used to select appropriate maintenance opportunities according to equipment status over a period of time. The CBM of aircraft fleets is a fleet maintenance planning problem. In this problem, mission requirements, resource constraints, and aircraft statuses are considered to find an optimal strategy set. Given that the maintenance strategies for each aircraft are finite, fleet CBM can be treated as a combinatorial optimization problem. In this study, the process of making a decision on the CBM of military fleets is analyzed. The fleet CBM problem is treated as a two-stage dynamic decision-making problem. Aircraft are divided into dispatch and standby sets; thus, the problem scale is significantly reduced. A heuristic hybrid game (HHG) approach comprising a competition game and a cooperative game is proposed on the basis of heuristic rule. In the dispatch set, a competition game approach is proposed to search for a local optimal strategy matrix. A cooperative game method for the two sets is also proposed to ensure global optimization. Finally, a case study regarding a fleet comprising 20 aircraft is conducted, with the results proving that the approach efficiently generates outcomes that meet the mission risk-oriented schedule requirement. - Highlights: • A new heuristic hybrid game method for fleet condition-based maintenance is proposed. • The problem is simplified by hierarchical solving based on dispatch and standby set. • The local optimal solution is got by competition game algorithm for dispatch set. • The global optimal solution is got by cooperative game algorithm between two sets.

  13. An Abstraction Hierarchy based mobile PC display design in NPP maintenance considering the level of expertise

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, In; Seong, Poong Hyun

    2011-01-01

    Research highlights: → Six levels of Abstraction Hierarchy based information for maintenance were proposed. → Errors and workload with AH based information display were reduced for LL subjects. → Design concerns discovered can be applied to practical use of mobile maintenance aids. - Abstract: Recently, the importance of effective maintenance in nuclear power plants (NPPs) has been emphasized and research into effective maintenance by adopting mobile maintenance aids (MMAs) have been attempted. For improved and effective use of an MMA display design method based on the hierarchy is proposed and its design considerations are discussed in this study. Six levels of hierarchy are proposed in this paper to classify the maintenance information. By classifying and organizing maintenance information using the hierarchy, maintenance information can be used effectively by users with either high or low levels of expertise. When information classification has been finished, the information for MMA design is selected and designed. With the considerations of MMA design analysis and guidelines, a hierarchy-based MMA is designed for the maintenance tasks. An experiment is conducted using the hierarchy-based MMA in order to estimate the effectiveness of the proposed method for the maintenance tasks and to identify design considerations to enhance the proposed MMAs. The result indicated that a hierarchy-based manual was more effective than a conventional manual in terms of task completion time and number of errors. The workload for the hierarchy-based manual was estimated less than the conventional manual for subjects with low level of expertise. As the level of expertise increases, subjects tended to follow more abstract information while the number of navigations decreased. It is believed that when mobile devices become pervasive in NPP maintenance fields, the hierarchy model applied MMAs can be used as an effective maintenance supporting tool.

  14. Joint Scheduling for Dual-Hop Block-Fading Broadcast Channels

    KAUST Repository

    Zafar, Ammar

    2012-09-16

    In this paper, we propose joint user-and-hop scheduling over dual-hop block-fading broadcast channels in order to exploit multi-user diversity gains and multi-hop diversity gains all together. To achieve this objective, the first and second hops are scheduled opportunistically based on the channel state information and as a prerequisite we assume that the relay, which is half-duplex and operates using decode-and-forward, is capable of storing the received packets from the source until the channel condition of the destined user becomes good to be scheduled. We formulate the joint scheduling problem as maximizing the weighted sum of the long term achievable rates by the users under a stability constraint, which means that on the long term the rate received by the relay should equal the rate transmitted by it, in addition to constant or variable power constraints. We show that this problem is equivalent to a single-hop broadcast channel by treating the source as a virtual user with an optimal priority weight that maintains the stability constraint. We show how to obtain the source weight either off-line based on channel statistics or on real-time based on channel measurements. Furthermore, we consider special cases including the maximum sum rate scheduler and the proportional fair scheduler. We demonstrate via numerical results that our proposed joint scheduling scheme enlarges the rate region as compared with a scheme that employs multi-user scheduling alone.

  15. Multiuser Scheduling on the Downlink of an LTE Cellular System

    Directory of Open Access Journals (Sweden)

    Raymond Kwan

    2008-01-01

    Full Text Available The challenge of scheduling user transmissions on the downlink of a long-term evolution (LTE cellular communication system is addressed. In particular, a novel optimalmultiuser scheduler is proposed. Numerical results show that the system performance improves with increasing correlation among OFDMA subcarriers. It is found that only a limited amount of feedback information is needed to achieve relatively good performance. A suboptimal reduced-complexity scheduler is also proposed and shown to provide good performance. The suboptimal scheme is especially attractive when the number of users is large, in which case the complexity of the optimal scheme is high.

  16. A strategic value management approach for energy and maintenance management in a building

    Science.gov (United States)

    Nawi, Mohd Nasrun Mohd; Dahlan, Nofri Yenita; Nadarajan, Santhirasegaran

    2015-05-01

    Fragmentation process is always been highlighted by the stakeholders in the construction industry as one of the `critical' issue that diminishing the opportunity for stakeholders that involved during the operation and maintenance stage to influence design decisions. Failure of design professionals to consider how a maintenance contractor or facility manager will construct the design thus results in higher operating cost, wastage, defects during the maintenance and operation process. Moving towards team integration is considered a significant strategy for overcoming the issue. Value Management is a style of management dedicated to guiding people and promoting innovation with the aim to improve overall building performance through structured, team-oriented exercises which make explicit, and appraise subsequent decisions, by reference to the value requirements of the clients. Accordingly, this paper discusses the fragmentation issue in more detail including the definition, causes and effects to the maintenance and operation of building and at the same time will highlighted the potential of VM integrated team approach as a strategic management approach for overcoming that issue. It also explores that the team integration strategy alleviates scheduling problems, delays and disputes during the construction process, and, hence, prevent harming the overall building performance.

  17. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  18. Effects of load and maintenance duration on the time course of information encoding and retrieval in working memory: from perceptual analysis to post-categorization processes.

    Directory of Open Access Journals (Sweden)

    Diego ePinal

    2014-04-01

    Full Text Available Working memory (WM involves three cognitive events: information encoding, maintenance and retrieval; these are supported by brain activity in a network of frontal, parietal and temporal regions. Manipulation of WM load and duration of the maintenance period can modulate this activity. Although such modulations have been widely studied using the ERP technique, a precise description of the time course of brain activity during encoding and retrieval is still required. Here, we used this technique and principal component analysis to assess the time course of brain activity during encoding and retrieval in a delayed match to sample task. We also investigated the effects of memory load and duration of the maintenance period on ERP activity. Brain activity was similar during information encoding and retrieval and comprised six temporal factors, which closely matched the latency and scalp distribution of some ERP components: P1, N1, P2, N2, P300 and a slow wave. Changes in memory load modulated task performance and yielded variations in frontal lobe activation. Moreover, the P300 amplitude was smaller in the high than in the low load condition during encoding and retrieval. Conversely, the slow wave amplitude was higher in the high than in the low load condition during encoding, and the same was true for the N2 amplitude during retrieval. Thus, during encoding, memory load appears to modulate the processing resources for context updating and post-categorization processes, and during retrieval it modulates resources for stimulus classification and context updating. Besides, despite the lack of differences in task performance related to duration of the maintenance period, larger N2 amplitude and stronger activation of the left temporal lobe after long than after short maintenance periods were found during information retrieval. Thus, results regarding the duration of maintenance period were complex, and future work is required to test the time-based decay

  19. 76 FR 10233 - Schedule of Water Charges

    Science.gov (United States)

    2011-02-24

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 420 Schedule of Water Charges AGENCY: Delaware River..., Part III, Basin Regulations--Water Supply Charges. Accordingly, the Commission's water charging rates..., 2011. Effective Date: February 24, 2011. FOR FURTHER INFORMATION CONTACT: For questions about the water...

  20. Logistic optimization of maintenance management of pipeline network using operational research resources; Otimizacao logistica do gerenciamento de manutencoes na malha de gasodutos em operacao utilizando os recursos de pesquisa operacional

    Energy Technology Data Exchange (ETDEWEB)

    Madeira, Italo M [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Andrade, Gustavo C. de [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2008-07-01

    A Gas pipeline system is operated typically loaded every time and requires a continuous maintenance plan to prevent or correct faults that can compromise the shipping and the delivery of the product. In this meaning, this paper describes how to provide more integration between the elements from the pipeline management logistics to do the scheduling tasks of maintenance using operational research resources. This tool intends to discover with an optimal result, the best days for each maintenance intervention in pipeline doing an economically distributed maintenance plan. (author)