WorldWideScience

Sample records for schedule change contained

  1. Throughput maximization of parcel sorter systems by scheduling inbound containers

    NARCIS (Netherlands)

    Haneyah, S.W.A.; Schutten, Johannes M.J.; Fikse, K.; Clausen, Uwe; ten Hompel, Michael; Meier, J. Fabian

    2013-01-01

    This paper addresses the inbound container scheduling problem for automated sorter systems in express parcel sorting. The purpose is to analyze which container scheduling approaches maximize the throughput of sorter systems. We build on existing literature, particularly on the dynamic load balancing

  2. Improving the performance of sorter systems by scheduling inbound containers

    NARCIS (Netherlands)

    Haneyah, S.W.A.; Schutten, Johannes M.J.; Fikse, K.

    2013-01-01

    This paper addresses the inbound containers scheduling problem for automated sorter systems in two different industrial sectors: parcel & postal sorting and baggage handling. We build on existing literature, particularly on the dynamic load balancing algorithm designed for the parcel hub scheduling

  3. Gantry Crane Scheduling with Interference Constraints in Railway Container Terminals

    Directory of Open Access Journals (Sweden)

    Peng Guo

    2013-04-01

    Full Text Available Railway container terminals, where gantry cranes are responsible for loading and unloading containers between freight trains and yards, are important hubs of hinterland logistics transportation. Terminal managers confront the challenge in improving the efficiency of their service. As the most expensive equipment in a terminal, the operational performance of gantry cranes is a crucial factor. In this paper, the gantry crane scheduling problem of railway container terminals is investigated. A mixed integer programming model which considers the effect of dwelling position dependent processing times is formulated. In addition, the safety distances, the travel times and the non-crossing requirement of cranes are incorporated in the mathematical model. A novel discrete artificial bee colony algorithm is presented to solve the intractable scheduling problem. Computational experiments are conducted to evaluate the proposed algorithm on some randomly constructed instances based on typical terminal operational data. Experimental results show that the proposed approach can obtain near optimal solutions for the investigated problem in a reasonable computational time.

  4. Management Matters. Changing to Flexible Scheduling

    Science.gov (United States)

    Pappas, Marjorie L.

    2005-01-01

    Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…

  5. Design Change Model for Effective Scheduling Change Propagation Paths

    Science.gov (United States)

    Zhang, Hai-Zhu; Ding, Guo-Fu; Li, Rong; Qin, Sheng-Feng; Yan, Kai-Yin

    2017-09-01

    Changes in requirements may result in the increasing of product development project cost and lead time, therefore, it is important to understand how requirement changes propagate in the design of complex product systems and be able to select best options to guide design. Currently, a most approach for design change is lack of take the multi-disciplinary coupling relationships and the number of parameters into account integrally. A new design change model is presented to systematically analyze and search change propagation paths. Firstly, a PDS-Behavior-Structure-based design change model is established to describe requirement changes causing the design change propagation in behavior and structure domains. Secondly, a multi-disciplinary oriented behavior matrix is utilized to support change propagation analysis of complex product systems, and the interaction relationships of the matrix elements are used to obtain an initial set of change paths. Finally, a rough set-based propagation space reducing tool is developed to assist in narrowing change propagation paths by computing the importance of the design change parameters. The proposed new design change model and its associated tools have been demonstrated by the scheduling change propagation paths of high speed train's bogie to show its feasibility and effectiveness. This model is not only supportive to response quickly to diversified market requirements, but also helpful to satisfy customer requirements and reduce product development lead time. The proposed new design change model can be applied in a wide range of engineering systems design with improved efficiency.

  6. Orchestration and scheduling of containers in highly available environments

    OpenAIRE

    Golja , Dejan

    2016-01-01

    We are in a period of accelerated adoption of containers - every month more and more companies are introducing and exploring the possibility of using this technology in their environment. Despite the fact that the technology and tools associated with its use are not yet fully standardized, they still bring a lot of benefits. They enable simplified development, empower the usage of microservices and provide a better platform to adjust the capacity of the resources, based on traffic. Neverthele...

  7. Multiple quay cranes scheduling for double cycling in container terminals.

    Science.gov (United States)

    Chu, Yanling; Zhang, Xiaoju; Yang, Zhongzhen

    2017-01-01

    Double cycling is an efficient tool to increase the efficiency of quay crane (QC) in container terminals. In this paper, an optimization model for double cycling is developed to optimize the operation sequence of multiple QCs. The objective is to minimize the makespan of the ship handling operation considering the ship balance constraint. To solve the model, an algorithm based on Lagrangian relaxation is designed. Finally, we compare the efficiency of the Lagrangian relaxation based heuristic with the branch-and-bound method and a genetic algorithm using instances of different sizes. The results of numerical experiments indicate that the proposed model can effectively reduce the unloading and loading times of QCs. The effects of the ship balance constraint are more notable when the number of QCs is high.

  8. Multiple quay cranes scheduling for double cycling in container terminals.

    Directory of Open Access Journals (Sweden)

    Yanling Chu

    Full Text Available Double cycling is an efficient tool to increase the efficiency of quay crane (QC in container terminals. In this paper, an optimization model for double cycling is developed to optimize the operation sequence of multiple QCs. The objective is to minimize the makespan of the ship handling operation considering the ship balance constraint. To solve the model, an algorithm based on Lagrangian relaxation is designed. Finally, we compare the efficiency of the Lagrangian relaxation based heuristic with the branch-and-bound method and a genetic algorithm using instances of different sizes. The results of numerical experiments indicate that the proposed model can effectively reduce the unloading and loading times of QCs. The effects of the ship balance constraint are more notable when the number of QCs is high.

  9. Schedules of Controlled Substances: Placement of FDA-Approved Products of Oral Solutions Containing Dronabinol [(-)-delta-9-trans-

    Science.gov (United States)

    2017-11-22

    This final rule adopts without changes an interim final rule with request for comments published in the Federal Register on March 23, 2017. On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. The Drug Enforcement Administration (DEA) maintains FDA-approved products of oral solutions containing dronabinol in schedule II of the Controlled Substances Act.

  10. Planning and scheduling for maritime container yards supporting and facilitating the global supply network

    CERN Document Server

    Li, Wenkai; Goh, Mark

    2015-01-01

    Maximizing reader insights into the challenges facing maritime supply chains and container port logistics service providers in Asia, this book highlights their innovative responses to these challenges through real-world case studies. With a focus on mathematical modeling, simulation and heuristics approaches, this book provides academics, engineers, container terminal operators, students in logistics and supply chain management with the latest approaches that can be used to address the planning and scheduling problem in large container terminal yards. This book can be used on a self-contained basis as teaching cases in an undergraduate or specialist class setting, or on techniques applied to maritime container operations for port operations.

  11. 10 CFR 32.103 - Schedule D-prototype tests for ice detection devices containing strontium-90.

    Science.gov (United States)

    2010-01-01

    ... water and the strontium-90 shall be considered leakage. (e) Observations. After each of the tests... 10 Energy 1 2010-01-01 2010-01-01 false Schedule D-prototype tests for ice detection devices... § 32.103 Schedule D—prototype tests for ice detection devices containing strontium-90. An applicant for...

  12. Changed nursing scheduling for improved safety culture and working conditions - patients' and nurses' perspectives.

    Science.gov (United States)

    Kullberg, Anna; Bergenmar, Mia; Sharp, Lena

    2016-05-01

    To evaluate fixed scheduling compared with self-scheduling for nursing staff in oncological inpatient care with regard to patient and staff outcomes. Various scheduling models have been tested to attract and retain nursing staff. Little is known about how these schedules affect staff and patients. Fixed scheduling and self-scheduling have been studied to a small extent, solely from a staff perspective. We implemented fixed scheduling on two of four oncological inpatient wards. Two wards kept self-scheduling. Through a quasi-experimental design, baseline and follow-up measurements were collected among staff and patients. The Safety Attitudes Questionnaire was used among staff, as well as study-specific questions for patients and staff. Fixed scheduling was associated with less overtime and fewer possibilities to change shifts. Self-scheduling was associated with more requests from management for short notice shift changes. The type of scheduling did not affect patient-reported outcomes. Fixed scheduling should be considered in order to lower overtime. Further research is necessary and should explore patient outcomes to a greater extent. Scheduling is a core task for nurse managers. Our study suggests fixed scheduling as a strategy for managers to improve the effective use of resources and safety. © 2016 John Wiley & Sons Ltd.

  13. Modelling and Metaheuristic for Gantry Crane Scheduling and Storage Space Allocation Problem in Railway Container Terminals

    Directory of Open Access Journals (Sweden)

    Ming Zeng

    2017-01-01

    Full Text Available The gantry crane scheduling and storage space allocation problem in the main containers yard of railway container terminal is studied. A mixed integer programming model which comprehensively considers the handling procedures, noncrossing constraints, the safety margin and traveling time of gantry cranes, and the storage modes in the main area is formulated. A metaheuristic named backtracking search algorithm (BSA is then improved to solve this intractable problem. A series of computational experiments are carried out to evaluate the performance of the proposed algorithm under some randomly generated cases based on the practical operation conditions. The results show that the proposed algorithm can gain the near-optimal solutions within a reasonable computation time.

  14. Investigating transportation system in container terminals and developing a yard crane scheduling model

    Directory of Open Access Journals (Sweden)

    Hassan Javanshir

    2012-01-01

    Full Text Available The world trade has tremendous growth in marine transportation. This paper studies yard crane scheduling problem between different blocks in container terminal. Its purpose is to minimize total travel time of cranes between blocks and total delayed workload in blocks at different periods. In this way the problem is formulated as a mixed integer programming (MIP model. The block pairs between which yard cranes will be transferred, during the various periods, is determined by this model. Afterwards the model is coded in LINGO software, which benefits from branch and bound algorithm to solve. Computational results determine the yard cranes movement sequence among blocks to achieve minimum total travel time for cranes and minimum total delayed workload in blocks at different planning periods. Also the results show capability and adequacy of the developed model.

  15. Container volume and subirrigation schedule influence Quercus variabilis seedling growth and nutrient status in the nursery and field

    Science.gov (United States)

    Qiaoyu Sun; R. Kasten Dumroese; Yong Liu

    2018-01-01

    Container volume and irrigation management affect seedling growth in the nursery and field. We evaluated the effects of container volumes (D40, 656 ml; D60, 983 ml) and subirrigation schedules (85%, 75%, 65%, and 55% of 100% total substrate moisture content, TSMC) on seedling growth in a greenhouse and outplanting performance of Chinese cork oak (Quercus variabilis...

  16. 18 CFR 154.313 - Schedules for minor rate changes.

    Science.gov (United States)

    2010-04-01

    ... of the End of the Test Period. (7) Schedule E. Working Capital. Show the various components provided.... Depreciation, Depletion, Amortization and Negative Salvage Expenses. Show, separately, the gas plant depreciation, depletion, amortization, and negative salvage expenses by functional classifications. For each...

  17. 75 FR 33705 - Pesticide Management and Disposal; Standards for Pesticide Containers and Containment; Change to...

    Science.gov (United States)

    2010-06-15

    ... Pesticide Management and Disposal; Standards for Pesticide Containers and Containment; Change to Labeling... the pesticide container and containment regulations to provide a 4-month extension of the 40 CFR 156... pesticide labels to comply with the label requirements in the container and containment regulations. DATES...

  18. 75 FR 62323 - Pesticide Management and Disposal; Standards for Pesticide Containers and Containment; Change to...

    Science.gov (United States)

    2010-10-08

    ... Pesticide Management and Disposal; Standards for Pesticide Containers and Containment; Change to Labeling... the pesticide container and containment regulations to provide an 8-month extension of the labeling... titled ``Pesticide Management and Disposal; Standards for Pesticide Containers and Containment'' (71 FR...

  19. Common project energy change. The schedule to the success

    International Nuclear Information System (INIS)

    Bartosch, Ulrich; Hennicke, Peter; Weiger, Hubert

    2014-01-01

    The energy change is the most important common work of the German after-war history. And it offers a unique collective field of learning, how the socio-ecological transformation can be converted in practice. If the energy change succeeds in an industrial country like Germany, many other countries can follow this example. The Bund fuer Umwelt und Naturschutz Deutschland (BUND) and the Vereinigung Deutscher Wissenschaftler (VDW) show as editors, what now must be done in order that the energy change becomes a success. Because currently threatens the energy change to be slowed down by the policy and talked to death by many stakeholders in the industry. This book demonstrates why the energy change is necessary and how it can succeed. It shows what has to be done and wants to use the existing enthusiasm in order to lead the common project energy change jointly to success. What is needed is a long-term policy that finally takes the reduction of energy consumption in attack.

  20. The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

    Science.gov (United States)

    Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param

    2016-01-01

    Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

  1. Routing and Scheduling Problems of Container Trucks in a Shared Resource Environment

    OpenAIRE

    Jeong, Kyungsoo

    2017-01-01

    More frequent vehicle movements are required for moving containers in a local area due to low unit volume that a single vehicle can handle compared with vessels and rails involved in the container supply chain. For this reason, truck operations for moving containers significantly affect not only transportation cost itself but also product price. They have inherent operational inefficiencies associated with empty container movements and container processes at facilities such as warehouses, d...

  2. 76 FR 33974 - Changes to the Schedule of Operations Regulations

    Science.gov (United States)

    2011-06-10

    ... cited approvingly to an older Supreme Court decision, Steiner v. Mitchell, 350 U.S. 247 (1956), in which... clothes in Steiner clearly qualify as non-unique gear. On the other hand, a comment submitted by an... example, in Steiner, the Supreme Court considered whether changing into and out of old work clothes at a...

  3. Preventive maintenance optimization for a multi-component system under changing job shop schedule

    International Nuclear Information System (INIS)

    Zhou Xiaojun; Lu Zhiqiang; Xi Lifeng

    2012-01-01

    Variability and small lot size is a common feature for many discrete manufacturing processes designed to meet a wide array of customer needs. Because of this, job shop schedule often has to be continuously updated in reaction to changes in production plan. Generally, the aim of preventive maintenance is to ensure production effectiveness and therefore the preventive maintenance models must have the ability to be adaptive to changes in job shop schedule. In this paper, a dynamic opportunistic preventive maintenance model is developed for a multi-component system with considering changes in job shop schedule. Whenever a job is completed, preventive maintenance opportunities arise for all the components in the system. An optimal maintenance practice is dynamically determined by maximizing the short-term cumulative opportunistic maintenance cost savings for the system. The numerical example shows that the scheme obtained by the proposed model can effectively address the preventive maintenance scheduling problem caused by the changes in job shop schedule and is more efficient than the ones based on two other commonly used preventive maintenance models.

  4. Graduate Program Scheduling Gains Flexibility through Container Courses: A Case Study

    Science.gov (United States)

    Rose, Richard

    2011-01-01

    Online course delivery makes possible one innovation which can provide each student with greater program flexibility as well as some personal ownership of the direction and pace of his degree progress. This concept can be called the "container course." A container course is the offering of more than one course simultaneously under a single course…

  5. Changing Workplaces to Reduce Work-Family Conflict: Schedule Control in a White-Collar Organization.

    Science.gov (United States)

    Kelly, Erin L; Moen, Phyllis; Tranby, Eric

    2011-04-01

    Work-family conflicts are common and consequential for employees, their families, and work organizations. Can workplaces be changed to reduce work-family conflict? Previous research has not been able to assess whether workplace policies or initiatives succeed in reducing work-family conflict or increasing work-family fit. Using longitudinal data collected from 608 employees of a white-collar organization before and after a workplace initiative was implemented, we investigate whether the initiative affects work-family conflict and fit, whether schedule control mediates these effects, and whether work demands, including long hours, moderate the initiative's effects on work-family outcomes. Analyses clearly demonstrate that the workplace initiative positively affects the work-family interface, primarily by increasing employees' schedule control. This study points to the importance of schedule control for our understanding of job quality and for management policies and practices.

  6. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  7. EoC Study Update to Examine the Cost, Schedule and Technical Changes to NASA Projects

    Science.gov (United States)

    Bitten, Bob; Emmons, Debra; Shinn, Stephen; Scolese, Chris

    2018-01-01

    The original National Aeronautics and Space Administration (NASA) Explanation of Change (EoC) study was conducted in 2010 to understand the underlying causes of cost and schedule growth. The first study consisted of 25 missions launched from 2000 to 2010 and looked at the events that led to growth. These events were categorized into different bins that were rolled up to quantify whether the growth was due to internal planning, or internal execution, or from external forces and found that the growth was evenly distributed among those three categories. The result of the study presented nine considerations focused at reducing growth due to project external events and internal planning events. Although no one 'magic bullet' consideration was discovered in the previous work, the nine considerations taken as a whole were postulated to help reduce cost and schedule change in future NASA missions. A recent update was conducted that included investigating 8 missions developed since the previous study to determine if the results were different. Cost, schedule, and mass increases were analyzed from the start of Phase B through Preliminary Design Review and Critical Design Review to Launch. As shown in this paper, the results are better with overall cost and schedule growth being reduced. The paper will show a comparison of the previous results to the updated results to show specific reductions and provide an explanation of which recommendations were followed.

  8. Impact of the Hydrocodone Schedule Change on Opioid Prescription Patterns in South Dakota.

    Science.gov (United States)

    Kuschel, Lauren M; Mort, Jane M

    2017-10-01

    Prescription opioid use is becoming increasingly common; consequently, opioid overdose deaths are increasing at an alarming rate. Hydrocodone, one of the most commonly abused opioids, was changed from a schedule III controlled substance to the more stringent schedule II to decrease abuse and diversion, effective Oct. 6, 2014. The objective of this study was to examine the impact of the hydrocodone schedule change on opioid prescribing in South Dakota. Opioid prescription patterns were examined in the following six-month phases: the baseline phase before the change, the transition phase when existing hydrocodone prescriptions could still be refilled, and the final phase. The South Dakota Board of Pharmacy Prescription Drug Monitoring Program provided aggregate monthly data for South Dakota opioid prescriptions (i.e., total number of prescriptions and days supplied), including urban and rural stratification. T-tests were performed on the monthly values for each phase to determine the significance of differences in prescription features between phases. The number of hydrocodone prescriptions significantly decreased 14 percent from baseline to final phase, while the days supplied per prescription significantly increased 7.4 percent. These changes were greater in rural areas than in urban areas. Conversely, the number of other opioid prescriptions significantly increased by 6.5 percent over this timeframe. The number of hydrocodone prescriptions decreased, while the days supplied per prescription increased. These changes were greater in rural areas than in urban areas. In addition, the number of other opioid prescriptions increased. These trends may reflect some unintended effects of the schedule change.

  9. Schedules of Controlled Substances: Placement of FDA-Approved Products of Oral Solutions Containing Dronabinol [(-)-delta-9-transtetrahydrocannabinol (delta-9-THC)] in Schedule II. Interim final rule, with request for comments.

    Science.gov (United States)

    2017-03-23

    On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. Thereafter, the Department of Health and Human Services (HHS) provided the Drug Enforcement Administration (DEA) with a scheduling recommendation that would result in Syndros (and other oral solutions containing dronabinol) being placed in schedule II of the Controlled Substances Act (CSA). In accordance with the CSA, as revised by the Improving Regulatory Transparency for New Medical Therapies Act, DEA is hereby issuing an interim final rule placing FDA-approved products of oral solutions containing dronabinol in schedule II of the CSA.

  10. Hospital Readmissions Following Physician Call System Change: A Comparison of Concentrated and Distributed Schedules.

    Science.gov (United States)

    Yarnell, Christopher J; Shadowitz, Steven; Redelmeier, Donald A

    2016-07-01

    Physician call schedules are a critical element for medical practice and hospital efficiency. We compared readmission rates prior to and after a change in physician call system at Sunnybrook Health Sciences Centre. We studied patients discharged over a decade (2004 through 2013) and identified whether or not each patient was readmitted within the subsequent 28 days. We excluded patients discharged for a surgical, obstetrical, or psychiatric diagnosis. We used time-to-event analysis and time-series analysis to compare rates of readmission prior to and after the physician call system change (January 1, 2009). A total of 89,697 patients were discharged, of whom 10,001 (11%) were subsequently readmitted and 4280 died. The risk of readmission was increased by about 26% following physician call system change (9.7% vs 12.2%, P system change (95% confidence interval, 22%-31%; P system change persisted across patients with diverse ages, estimated readmission risks, and medical diagnoses. The net effect was equal to 7240 additional patient days in the hospital following call system change. A modest increase was observed at a nearby acute care hospital that did not change physician call system, and no increase in risk of death was observed with increased hospital readmissions. We suggest that changes in physician call systems sometimes increase subsequent hospital readmission rates. Further reductions in readmissions may instead require additional resources or ingenuity. Copyright © 2016 Elsevier Inc. All rights reserved.

  11. Lightweight scheduling of elastic analysis containers in a competitive cloud environment: a Docked Analysis Facility for ALICE

    Science.gov (United States)

    Berzano, D.; Blomer, J.; Buncic, P.; Charalampidis, I.; Ganis, G.; Meusel, R.

    2015-12-01

    During the last years, several Grid computing centres chose virtualization as a better way to manage diverse use cases with self-consistent environments on the same bare infrastructure. The maturity of control interfaces (such as OpenNebula and OpenStack) opened the possibility to easily change the amount of resources assigned to each use case by simply turning on and off virtual machines. Some of those private clouds use, in production, copies of the Virtual Analysis Facility, a fully virtualized and self-contained batch analysis cluster capable of expanding and shrinking automatically upon need: however, resources starvation occurs frequently as expansion has to compete with other virtual machines running long-living batch jobs. Such batch nodes cannot relinquish their resources in a timely fashion: the more jobs they run, the longer it takes to drain them and shut off, and making one-job virtual machines introduces a non-negligible virtualization overhead. By improving several components of the Virtual Analysis Facility we have realized an experimental “Docked” Analysis Facility for ALICE, which leverages containers instead of virtual machines for providing performance and security isolation. We will present the techniques we have used to address practical problems, such as software provisioning through CVMFS, as well as our considerations on the maturity of containers for High Performance Computing. As the abstraction layer is thinner, our Docked Analysis Facilities may feature a more fine-grained sizing, down to single-job node containers: we will show how this approach will positively impact automatic cluster resizing by deploying lightweight pilot containers instead of replacing central queue polls.

  12. Assessment of mumps-containing vaccine effectiveness during an outbreak: Importance to introduce the 2-dose schedule for China.

    Science.gov (United States)

    Ma, Chao; Liu, Yan; Tang, Jihai; Jia, Haimei; Qin, Wei; Su, Ying; Wang, Huaqing; Hao, Lixin

    2018-01-29

    China has used 3 different mumps-containing vaccines (MuCV) since 1990: monovalent mumps vaccine, measles-mumps (MM) vaccine, and measles-mumps-rubella (MMR) vaccine, and one dose MuCV (using MMR at 18 months) has been included in the EPI since 2007. MuCV effectiveness has been of concern following large-scale mumps outbreaks. In 2015, an outbreak of mumps occurred in a primary school, which allow us assess vaccine effectiveness of different MuCVs. All children in the school were studied as a retrospective cohort. Vaccination histories and case information were obtained from vaccination records and clinic/hospital logs. Parental questionnaires were used to confirm students' illnesses and calculate attack rate (AR). VE was assessed using the formula, VE = (AR in unvaccinated students- AR in the vaccinated students) / (AR in unvaccinated students). VEs of different type of MuCV were compared. In total, 283 students were identified as clinical mumps among the 2370 students, and 1908 students were included for MuCV VE assessment. 213 (including 21 [8.9%] patients) were 2-dose MuCV recipients (AR: 9.9%), 1165 (including 123 [51.9%] patients) were 1-dose recipients (AR: 10.6%), and 530 (including 93 [39.2%] patients) were unvaccinated (AR: 17.5%). VE was 44% for 2 doses and 40% for one dose. For one-MuCV-dose students, estimated mumps VE was 63% for vaccinated within 3 years (between vaccination and this outbreak); 50% for vaccinated within 3 to 5 years; and 34% for vaccinated more than 5 years. Comparing VE by vaccine type and 5-year interval since vaccination, VE for MMR was 60%, which was consistently higher than VE for monovalent mumps vaccine (22%) and MM (2%). This outbreak was associated with low and declining 1-dose MuCV effectiveness. China's immunization program should evaluate the potential of a 2-dose MMR schedule to adequately control mumps.

  13. Classical verification of quantum circuits containing few basis changes

    Science.gov (United States)

    Demarie, Tommaso F.; Ouyang, Yingkai; Fitzsimons, Joseph F.

    2018-04-01

    We consider the task of verifying the correctness of quantum computation for a restricted class of circuits which contain at most two basis changes. This contains circuits giving rise to the second level of the Fourier hierarchy, the lowest level for which there is an established quantum advantage. We show that when the circuit has an outcome with probability at least the inverse of some polynomial in the circuit size, the outcome can be checked in polynomial time with bounded error by a completely classical verifier. This verification procedure is based on random sampling of computational paths and is only possible given knowledge of the likely outcome.

  14. Development of Latent Heat Storage Phase Change Material Containing Plaster

    Directory of Open Access Journals (Sweden)

    Diana BAJARE

    2016-05-01

    Full Text Available This paper reviews the development of latent heat storage Phase Change Material (PCM containing plaster as in passive application. Due to the phase change, these materials can store higher amounts of thermal energy than traditional building materials and can be used to add thermal inertia to lightweight constructions. It was shown that the use of PCMs have advantages stabilizing the room temperature variations during summer days, provided sufficient night ventilation is allowed. Another advantage of PCM usage is stabilized indoor temperature on the heating season. The goal of this study is to develop cement and lime based plaster containing microencapsulated PCM. The plaster is expected to be used for passive indoor applications and enhance the thermal properties of building envelope. The plaster was investigated under Scanning Electron Microscope and the mechanical, physical and thermal properties of created plaster samples were determined.

  15. Designing container shipping network under changing demand and freight rates

    Directory of Open Access Journals (Sweden)

    C. Chen

    2010-03-01

    Full Text Available This paper focuses on the optimization of container shipping network and its operations under changing cargo demand and freight rates. The problem is formulated as a mixed integer non-linear programming problem (MINP with an objective of maximizing the average unit ship-slot profit at three stages using analytical methodology. The issues such as empty container repositioning, ship-slot allocating, ship sizing, and container configuration are simultaneously considered based on a series of the matrices of demand for a year. To solve the model, a bi-level genetic algorithm based method is proposed. Finally, numerical experiments are provided to illustrate the validity of the proposed model and algorithms. The obtained results show that the suggested model can provide a more realistic solution to the issues on the basis of changing demand and freight rates and arrange a more effective approach to the optimization of container shipping network structures and operations than does the model based on the average demand.

  16. Analysis of wallboard containing a phase change material

    Science.gov (United States)

    Tomlinson, J. J.; Heberle, D. P.

    Phase change materials (PCMs) used on the interior of buildings hold the promise for improved thermal performance by reducing the energy requirements for space conditioning and by improving thermal comfort by reducing temperature swings inside the building. Efforts are underway to develop a gypsum wallboard containing a hydrocarbon PCM. With a phase change temperature in the room temperature range, the PCM wallboard adds substantially to the thermal mass of the building while serving the same architectural function as conventional wallboard. To determine the thermal and economic performance of this PCM wallboard, the Transient Systems Simulation Program (TRNSYS) was modified to accommodate walls that are covered with PCM plasterboard, and to apportion the direct beam solar radiation to interior surfaces of a building. The modified code was used to simulate the performance of conventional and direct-gain passive solar residential-sized buildings with and without PCM wallboard. Space heating energy savings were determined as a function of PCM wallboard characteristics. Thermal comfort improvements in buildings containing the PCM were qualified in terms of energy savings. The report concludes with a present worth economic analysis of these energy savings and arrives at system costs and economic payback based on current costs of PCMs under study for the wallboard application.

  17. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  18. The impact of a scheduling change on ninth grade high school performance on biology benchmark exams and the California Standards Test

    Science.gov (United States)

    Leonardi, Marcelo

    The primary purpose of this study was to examine the impact of a scheduling change from a trimester 4x4 block schedule to a modified hybrid schedule on student achievement in ninth grade biology courses. This study examined the impact of the scheduling change on student achievement through teacher created benchmark assessments in Genetics, DNA, and Evolution and on the California Standardized Test in Biology. The secondary purpose of this study examined the ninth grade biology teacher perceptions of ninth grade biology student achievement. Using a mixed methods research approach, data was collected both quantitatively and qualitatively as aligned to research questions. Quantitative methods included gathering data from departmental benchmark exams and California Standardized Test in Biology and conducting multiple analysis of covariance and analysis of covariance to determine significance differences. Qualitative methods include journal entries questions and focus group interviews. The results revealed a statistically significant increase in scores on both the DNA and Evolution benchmark exams. DNA and Evolution benchmark exams showed significant improvements from a change in scheduling format. The scheduling change was responsible for 1.5% of the increase in DNA benchmark scores and 2% of the increase in Evolution benchmark scores. The results revealed a statistically significant decrease in scores on the Genetics Benchmark exam as a result of the scheduling change. The scheduling change was responsible for 1% of the decrease in Genetics benchmark scores. The results also revealed a statistically significant increase in scores on the CST Biology exam. The scheduling change was responsible for .7% of the increase in CST Biology scores. Results of the focus group discussions indicated that all teachers preferred the modified hybrid schedule over the trimester schedule and that it improved student achievement.

  19. Gamma radiation induced changes in nuclear waste glass containing Eu

    Science.gov (United States)

    Mohapatra, M.; Kadam, R. M.; Mishra, R. K.; Kaushik, C. P.; Tomar, B. S.; Godbole, S. V.

    2011-10-01

    Gamma radiation induced changes were investigated in sodium-barium borosilicate glasses containing Eu. The glass composition was similar to that of nuclear waste glasses used for vitrifying Trombay research reactor nuclear waste at Bhabha Atomic Research Centre, India. Photoluminescence (PL) and electron paramagnetic resonance (EPR) techniques were used to study the speciation of the rare earth (RE) ion in the matrix before and after gamma irradiation. Judd-Ofelt ( J- O) analyses of the emission spectra were done before and after irradiation. The spin counting technique was employed to quantify the number of defect centres formed in the glass at the highest gamma dose studied. PL data suggested the stabilisation of the trivalent RE ion in the borosilicate glass matrix both before and after irradiation. It was also observed that, the RE ion distributes itself in two different environments in the irradiated glass. From the EPR data it was observed that, boron oxygen hole centre based radicals are the predominant defect centres produced in the glass after irradiation along with small amount of E’ centres. From the spin counting studies the concentration of defect centres in the glass was calculated to be 350 ppm at 900 kGy. This indicated the fact that bulk of the glass remained unaffected after gamma irradiation up to 900 kGy.

  20. Discontinuous Schedule of Bevacizumab in Colorectal Cancer Induces Accelerated Tumor Growth and Phenotypic Changes

    Directory of Open Access Journals (Sweden)

    Selma Becherirat

    2018-04-01

    Full Text Available Antiangiogenics administration in colorectal cancer patients seemed promising therapeutic approach. Inspite of early encouraging results, it however gave only modest clinical benefits. When AAG was administered with discontinuous schedule, the disease showed acceleration in certain cases. Though resistance to AAG has been extensively studied, it is not documented for discontinuous schedules. To simulate clinical situations, we subjected a patient-derived CRC subcutaneous xenograft in mice to three different protocols: 1 AAG (bevacizumab treatment for 30 days (group A (group B was the control, 2 bevacizumab treatment for 50 days (group C and bevacizumab for 30 days and 20 without treatment (group D, and 3 bevacizumab treatment for 70 days (group E and 70 days treatment with a drug-break period between day 30 and 50 (group F. The tumor growth was monitored, and at sacrifice, the vascularity of tumors was measured and the proangiogenic factors quantified. Tumor phenotype was studied by quantifying cancer stem cells. Interrupting bevacizumab during treatment accelerated tumor growth and revascularization. A significant increase of proangiogenic factors was observed when therapy was stopped. On withdrawal of bevacizumab, as also after the drug-break period, the plasmatic VEGF increased significantly. Similarly, a notable increase of CSCs after the withdrawal and drug-break period of bevacizumab was observed (P<.01. The present study indicates that bevacizumab treatment needs to be maintained because discontinuous schedules tend to trigger tumor regrowth, and increase tumor resistance and CSC heterogeneity.

  1. Modeling and distributed gain scheduling strategy for load frequency control in smart grids with communication topology changes.

    Science.gov (United States)

    Liu, Shichao; Liu, Xiaoping P; El Saddik, Abdulmotaleb

    2014-03-01

    In this paper, we investigate the modeling and distributed control problems for the load frequency control (LFC) in a smart grid. In contrast with existing works, we consider more practical and real scenarios, where the communication topology of the smart grid changes because of either link failures or packet losses. These topology changes are modeled as a time-varying communication topology matrix. By using this matrix, a new closed-loop power system model is proposed to integrate the communication topology changes into the dynamics of a physical power system. The globally asymptotical stability of this closed-loop power system is analyzed. A distributed gain scheduling LFC strategy is proposed to compensate for the potential degradation of dynamic performance (mean square errors of state vectors) of the power system under communication topology changes. In comparison to conventional centralized control approaches, the proposed method can improve the robustness of the smart grid to the variation of the communication network as well as to reduce computation load. Simulation results show that the proposed distributed gain scheduling approach is capable to improve the robustness of the smart grid to communication topology changes. © 2013 ISA. Published by ISA. All rights reserved.

  2. Containment

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    The primary mission of the Containment Group is to ensure that underground nuclear tests are satisfactorily contained. The main goal is the development of sound technical bases for containment-related methodology. Major areas of activity include siting, geologic description, emplacement hole stemming, and phenomenological predictions. Performance results of sanded gypsum concrete plugs on the Jefferson, Panamint, Cornucopia, Labquark, and Bodie events are given. Activities are also described in the following areas: computational capabilities site description, predictive modeling, and cavity-pressure measurement. Containment publications are listed. 8 references

  3. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  4. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  5. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  6. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  7. Self-Contained to Departmentalized: How Reading Habits Changed

    Science.gov (United States)

    Lamme, Linda Leonard

    1976-01-01

    Examined the reading habits of four 4th grade classes before and after a changeover from self-contained to departmentalized instruction. Results indicated a slightly lower mean number of books read and far less variation among classes in the number of books read after departmentalization. (JMB)

  8. How changes to the Medicare Benefits Schedule could improve the practice of cardiology and save taxpayer money.

    Science.gov (United States)

    Harper, Richard W; Nasis, Arthur; Sundararajan, Vijaya

    2015-09-21

    Rising health care costs above inflation are placing serious strains on the sustainability of the Australian Medicare system in its current structure. The Medicare Benefits Schedule (MBS), which lists rebates payable to patients for private medical services provided on a fee-for-service basis, is the cornerstone of the Australian health care system. Introduced in the 1980s, the MBS has changed little despite major advances in the evidence base for the practice of cardiology. We outline how we believe sensible changes to the MBS listings for four cardiac services--invasive coronary angiography, computed tomography coronary angiography, stress testing and percutaneous coronary intervention--would improve the clinical practice of cardiology and save substantial amounts of taxpayer money.

  9. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  10. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  11. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  12. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  13. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  14. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  15. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  16. Improvement of the Performance of Scheduled Stepwise Power Programme Changes within the European Power System

    DEFF Research Database (Denmark)

    Welfonder, E.; Weissbach, T.; Schulz, U.

    2008-01-01

    Since the deregulation of the electrical energy market, the technical realisation of power transactions based on energy market contracts often effects large stepwise power programme changes – especially at the change of the hour. Due to mainly economic reasons these stepwise power programme changes...... extended discussions with power plant and power system operators as well as with power plant dispatchers the described issues will be adopted into a VGB-recommendation which shall be published by VGB Powertech for Germany and Europe. Subsequently, it is intended to include the main elements of the VGB...

  17. Common project energy change. The schedule to the success; Gemeinschaftsprojekt Energiewende. Der Fahrplan zum Erfolg

    Energy Technology Data Exchange (ETDEWEB)

    Bartosch, Ulrich [Katholische Univ. Eichstaett-Ingolstadt (Germany).; VDW Vereinigung Deutscher Wissenschaftler, Berlin (Germany); Hennicke, Peter [Wuppertal Institut fuer Klima, Umwelt, Energie GmbH, Wuppertal (Germany); Weiger, Hubert (ed.) [Bund fuer Umwelt und Naturschutz Deutschland e.V. (BUND), Berlin (Germany)

    2014-07-01

    The energy change is the most important common work of the German after-war history. And it offers a unique collective field of learning, how the socio-ecological transformation can be converted in practice. If the energy change succeeds in an industrial country like Germany, many other countries can follow this example. The Bund fuer Umwelt und Naturschutz Deutschland (BUND) and the Vereinigung Deutscher Wissenschaftler (VDW) show as editors, what now must be done in order that the energy change becomes a success. Because currently threatens the energy change to be slowed down by the policy and talked to death by many stakeholders in the industry. This book demonstrates why the energy change is necessary and how it can succeed. It shows what has to be done and wants to use the existing enthusiasm in order to lead the common project energy change jointly to success. What is needed is a long-term policy that finally takes the reduction of energy consumption in attack.

  18. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  19. Characterization of Concrete Mixes Containing Phase Change Materials

    Science.gov (United States)

    Paksoy, H.; Kardas, G.; Konuklu, Y.; Cellat, K.; Tezcan, F.

    2017-10-01

    Phase change materials (PCM) can be used in passive building applications to achieve near zero energy building goals. For this purpose PCM can be added in building structures and materials in different forms. Direct incorporation, form stabilization and microencapsulation are different forms used for PCM integration in building materials. In addition to thermal properties of PCM itself, there are several other criteria that need to be fulfilled for the PCM enhanced building materials. Mechanical properties, corrosive effects, morphology and thermal buffering have to be determined for reliable and long-term applications in buildings. This paper aims to give an overview of characterization methods used to determine these properties in PCM added fresh concrete mixes. Thermal, compressive strength, corrosion, and microscopic test results for concrete mixes with PCM are discussed.

  20. Changing Workplaces to Reduce Work-Family Conflict: Schedule Control in a White-Collar Organization

    Science.gov (United States)

    Kelly, Erin L.; Moen, Phyllis; Tranby, Eric

    2011-01-01

    Work-family conflicts are common and consequential for employees, their families, and work organizations. Can workplaces be changed to reduce work-family conflict? Previous research has not been able to assess whether workplace policies or initiatives succeed in reducing work-family conflict or increasing work-family fit. Using longitudinal data…

  1. 77 FR 43084 - Multiple Award Schedule (MAS) Program Continuous Open Season-Operational Change

    Science.gov (United States)

    2012-07-23

    ... (GSA), Federal Acquisition Service (FAS) intends to institute a Demand Based Model (DBM) designed to... will restore and maintain the MAS program's value to Federal agencies as a streamlined acquisition... adding innovative solutions, improving pricing and simplifying the buying experience. DATES: This change...

  2. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  3. Applications of fibrous substrates containing insolubilized phase change polymers

    Science.gov (United States)

    Vigo, Tyrone L.; Bruno, Joseph S.

    1993-01-01

    Incorporation of polyethylene glycols into fibrous substrates produces several improved functional properties when they are insolubilized by crosslinking with a methylolamide resin or by polyacetal formation by their reaction with glyoxal. The range of molecular weights of polyols that may be insolubilized is broad as are the curing conditions (0.25-10 min at 80-200C). Most representative fiber types and blends (natural and synthetic) and all types of fabric constructions (woven, nonwoven and knit) have been modified by incorporation of the bound polyols. The most novel property is the thermal adaptability of the modified substrates to many climatic conditions. This adaptability is due to the high latent heat of the crosslinked polyols that function as phase change materials, the hydrophilic nature of the crosslinked polymer and its enhanced thermal conductivity. Other enhanced properties imparted to fabrics include flex and flat abrasion, antimicrobial activity, reduced static charge, resistance to oily soils, resiliency, wind resistance and reduced lint loss. Applications commercialized in the U.S. and Japan include sportswear and skiwear. Several examples of electric sets of properties useful for specific end uses are given. In addition, other uses are biomedical horticultural, aerospace, indoor insulation, automotive interiors and components and packaging material.

  4. Applications of fibrous substrates containing insolubilized phase change polymers

    Science.gov (United States)

    Vigo, Tyrone L.; Bruno, Joseph S.

    1993-02-01

    Incorporation of polyethylene glycols into fibrous substrates produces several improved functional properties when they are insolubilized by crosslinking with a methylolamide resin or by polyacetal formation by their reaction with glyoxal. The range of molecular weights of polyols that may be insolubilized is broad as are the curing conditions (0.25-10 min at 80-200C). Most representative fiber types and blends (natural and synthetic) and all types of fabric constructions (woven, nonwoven and knit) have been modified by incorporation of the bound polyols. The most novel property is the thermal adaptability of the modified substrates to many climatic conditions. This adaptability is due to the high latent heat of the crosslinked polyols that function as phase change materials, the hydrophilic nature of the crosslinked polymer and its enhanced thermal conductivity. Other enhanced properties imparted to fabrics include flex and flat abrasion, antimicrobial activity, reduced static charge, resistance to oily soils, resiliency, wind resistance and reduced lint loss. Applications commercialized in the U.S. and Japan include sportswear and skiwear. Several examples of electric sets of properties useful for specific end uses are given. In addition, other uses are biomedical horticultural, aerospace, indoor insulation, automotive interiors and components and packaging material.

  5. Changing Workplaces to Reduce Work-Family Conflict: Schedule Control in a White-Collar Organization

    OpenAIRE

    Kelly, Erin L.; Moen, Phyllis; Tranby, Eric

    2011-01-01

    Work-family conflicts are common and consequential for employees, their families, and work organizations. Can workplaces be changed to reduce work-family conflict? Previous research has not been able to assess whether workplace policies or initiatives succeed in reducing work-family conflict or increasing work-family fit. Using longitudinal data collected from 608 employees of a white-collar organization before and after a workplace initiative was implemented, we investigate whether the initi...

  6. Comparison of Mammographic Changes Across Three Different Fractionation Schedules for Early-Stage Breast Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Tian, Sibo [Department of Radiation Oncology, Rutgers Cancer Institute of New Jersey and Rutgers Robert Wood Johnson Medical School, Rutgers, New Jersey (United States); Paster, Lina F. [Department of Radiology, Rutgers Robert Wood Johnson Medical School, Rutgers, New Jersey (United States); Kim, Sinae [Biometrics Division, Rutgers Cancer Institute of New Jersey, and Department of Biostatistics, Rutgers School of Public Health, Rutgers, New Jersey (United States); Kirstein, Laurie [Division of Surgical Oncology, Rutgers Cancer Institute of New Jersey and Rutgers Robert Wood Johnson Medical School, Rutgers, New Jersey (United States); Haffty, Bruce G.; Ferro, Adam [Department of Radiation Oncology, Rutgers Cancer Institute of New Jersey and Rutgers Robert Wood Johnson Medical School, Rutgers, New Jersey (United States); Amorosa, Judith [Department of Radiology, Rutgers Robert Wood Johnson Medical School, Rutgers, New Jersey (United States); Goyal, Sharad, E-mail: goyalsh@rutgers.edu [Department of Radiation Oncology, Rutgers Cancer Institute of New Jersey and Rutgers Robert Wood Johnson Medical School, Rutgers, New Jersey (United States)

    2016-06-01

    Purpose: As the use of hypofractionated breast radiation therapy (RT) increases, so will the need for long-term data on post-RT mammographic changes. The purpose of the present study was to longitudinally compare the incidence of common mammographic sequelae seen after breast conserving surgery and RT in patients treated with accelerated partial breast irradiation (APBI), hypofractionated whole breast irradiation (HWBI), and conventionally fractionated whole breast irradiation (WBI). Methods and Materials: Patients treated with either APBI or HWBI after breast conserving therapy and with ≥3 mammograms of the treated breast were identified. They were matched 1:1 by age ±5 years to patients treated with WBI. The mammograms were evaluated for common post-RT breast findings by a mammographer who was unaware of the treatment. The outcomes were analyzed using a cumulative logistic regression model; P<.05 indicated statistically significance. Results: Of 89 patients treated with RT from 2006 to 2011, 29 had received APBI, 30 had received HWBI, and 30 had received WBI. Their median age was 60 years (range 33-83). A total of 605 mammograms were evaluated, with a median follow-up of 48 months. The treatment technique did not affect the severity of architectural distortion when the groups were evaluated longitudinally. The likelihood of finding skin thickening decreased with increasing follow-up duration (odds ratio 0.6; P<.001) adjusted for fractionation schemes. No differences were seen with respect to changes in skin thickening, fluid collections, or calcifications among the treatment groups, after adjustment for the follow-up time. The clinical characteristics, including age, race, T stage, and chemotherapy use, were not linked to the likelihood of finding several mammographic phenomena over time. Conclusions: Although specific post-treatment imaging findings evolved over time, RT fractionation did not alter the relative incidence or severity of architectural

  7. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  8. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  9. Preliminary Study of Applying Phase Change Materials (PCM) for Containment Passive Cooling

    International Nuclear Information System (INIS)

    Ko, A Reum; Lee, Jeong Ik; Yoon, Ho Joon

    2016-01-01

    Most of Pressurized Water Reactor (PWR) containments use fan cooler systems and containment spray systems. However, the importance of passive safety system has increased after the Fukushima accident. As the main passive safety system, Passive Containment Cooling System (PCCS), which utilizes natural phenomena to remove the heat released from the reactor, is suggested in the advanced pressurized water reactor (APWR). To increase the efficiency of passive cooling, additional passive containment cooling method using Phase Change Material (PCM) is suggested in this paper. For containment using PCMs, there are many advantages. Phase Change Material (PCM) is proposed as an additional passive containment cooling method to increase the efficiency of passive cooling in this paper. To apply proper PCMs to containment, commercially available PCMs were screened while reviewing thermophysical properties data and suggested selection criteria. A sensitivity study was also carried out to identify the effect of potential installation location of PCM using the CAP code. The pressure of containment in most cases showed slightly higher than that of the initial case. For the temperature of steam and water and humidity, similar results with the initial case were showed in most cases

  10. Preliminary Study of Applying Phase Change Materials (PCM) for Containment Passive Cooling

    Energy Technology Data Exchange (ETDEWEB)

    Ko, A Reum; Lee, Jeong Ik [KAIST, Daejeon (Korea, Republic of); Yoon, Ho Joon [KUSTAR, Abu Dhabi (United Arab Emirates)

    2016-05-15

    Most of Pressurized Water Reactor (PWR) containments use fan cooler systems and containment spray systems. However, the importance of passive safety system has increased after the Fukushima accident. As the main passive safety system, Passive Containment Cooling System (PCCS), which utilizes natural phenomena to remove the heat released from the reactor, is suggested in the advanced pressurized water reactor (APWR). To increase the efficiency of passive cooling, additional passive containment cooling method using Phase Change Material (PCM) is suggested in this paper. For containment using PCMs, there are many advantages. Phase Change Material (PCM) is proposed as an additional passive containment cooling method to increase the efficiency of passive cooling in this paper. To apply proper PCMs to containment, commercially available PCMs were screened while reviewing thermophysical properties data and suggested selection criteria. A sensitivity study was also carried out to identify the effect of potential installation location of PCM using the CAP code. The pressure of containment in most cases showed slightly higher than that of the initial case. For the temperature of steam and water and humidity, similar results with the initial case were showed in most cases.

  11. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  12. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  13. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  14. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  15. 75 FR 36306 - Chemical Mixtures Containing Listed Forms of Phosphorus and Change in Application Process

    Science.gov (United States)

    2010-06-25

    ... have large industrial uses. Regulated chemical mixtures are not items having common household uses... and others from exposure to the toxic chemicals left behind. Executive Order 12988 This regulation... 1117-AA66 Chemical Mixtures Containing Listed Forms of Phosphorus and Change in Application Process...

  16. British Container Breeding Mosquitoes: The Impact of Urbanisation and Climate Change on Community Composition and Phenology

    Science.gov (United States)

    Townroe, Susannah; Callaghan, Amanda

    2014-01-01

    The proliferation of artificial container habitats in urban areas has benefitted urban adaptable mosquito species globally. In areas where mosquitoes transmit viruses and parasites, it can promote vector population productivity and fuel mosquito-borne disease outbreaks. In Britain, storage of water in garden water butts is increasing, potentially expanding mosquito larval habitats and influencing population dynamics and mosquito-human contact. Here we show that the community composition, abundance and phenology of mosquitoes breeding in experimental water butt containers were influenced by urbanisation. Mosquitoes in urban containers were less species-rich but present in significantly higher densities (100.4±21.3) per container than those in rural containers (77.7±15.1). Urban containers were dominated by Culex pipiens (a potential vector of West Nile Virus [WNV]) and appear to be increasingly exploited by Anopheles plumbeus (a human-biting potential WNV and malaria vector). Culex phenology was influenced by urban land use type, with peaks in larval abundances occurring earlier in urban than rural containers. Among other factors, this was associated with an urban heat island effect which raised urban air and water temperatures by 0.9°C and 1.2°C respectively. Further increases in domestic water storage, particularly in urban areas, in combination with climate changes will likely alter mosquito population dynamics in the UK. PMID:24759617

  17. Effects of requested, forced and denied shift schedule change on work ability and health of nurses in Europe -results from the European NEXT-Study.

    Science.gov (United States)

    Galatsch, Michael; Li, Jian; Derycke, Hanne; Müller, Bernd Hans; Hasselhorn, Hans Martin

    2013-12-05

    Previous cross-sectional findings from the European Nurses Early Exit Study (NEXT) show that nurses who were dissatisfied with their work schedule tended to consider leaving the nursing profession. Mediating factors in this decision process may be caused by self-perceived poor work ability and/or health. The aim of this paper is to investigate changes in work ability and general health among nurses in relation to requested, forced and denied change of shift schedule. Longitudinal data from the NEXT Study was used. In total 11,102 nurses from Belgium, Germany, Finland, the Netherlands, Poland, Slovakia, France and Italy completed both the 'basic questionnaire' (t1) and the '12 month follow-up questionnaire' (t2). To examine the time-effect (repeated measures) and the group-effect of five defined groups of nurses on the Work Ability Index (WAI) and general health (SF36), an adjusted 2-way analysis of covariance (ANCOVA) was performed. The nurses who wanted to, but could not change their shifts during the 12 month follow-up had the lowest initial and follow-up scores for WAI (t1: 37.6, t2: 36.6, p work ability and to a lesser comparatively low extent with increased decline in health scores. A forced change of shift against the nurses' will was significantly associated with a deteriorating work ability and health. The findings would suggest that nurses' desire to change their shift patterns may be an indicator for perceived low work ability and/or low health. The results also indicate that fulfilling nurses' wishes with respect to their shift work pattern may improve their personal resources such as work ability and - to somewhat lesser extent - health. Disregarding nurses' preferences, however, bears the risk for further resource deterioration. The findings imply that shift schedule organization may constitute a valuable preventive tool to promote nurses' work ability and - to lesser extent - their perceived health, not least in aging nursing work forces.

  18. Environmental monitoring master sampling schedule, January--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1990-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1990 for the Environment Surveillance and Ground-Water Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This schedule includes ground-water sampling performed by PNL for environmental surveillance of the Hanford Site.

  19. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  20. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  1. Improving Performance of Cold-Chain Insulated Container with Phase Change Material: An Experimental Investigation

    Directory of Open Access Journals (Sweden)

    Li Huang

    2017-12-01

    Full Text Available The cold-chain transportation is an important means to ensure the drug and food safety. An cold-chain insulated container incorporating with Phase Change Material (PCM has been developed for a temperature-controlled transportation in the range of 2~8 °C. The container configuration and different preconditioning methods have been determined to realize a 72-h transportation under extremely high, extremely low, and alternating temperature conditions. The experimental results showed that the temperature-controlled time was extended from 1 h to more than 80 h and the internal temperature maintained at 4~5 °C by using a PCM with a melting/freezing point of 5 °C, while the container presented a subcooling effect in a range of −1~2 °C when using water as PCM. The experimental values of the temperature-controlled time agreed well with the theoretical values.

  2. Valency state changes in lanthanide-contained systems under high pressure

    Energy Technology Data Exchange (ETDEWEB)

    Jayaraman, A

    1980-08-01

    Changes in valency state induced by pressure in samarium sulphide SmS remind one of alchemy, as the mat black initial substance shines golden after the electron transition. The alchemist's dream is of course not realized, however the compound does exhibit an unusually interesting behaviour in the new state. The valency state of samarium as newly appeared fluctuated very rapidly between two electron configurations. Manipulation of the valency state by pressure or chemical substitution can basically change the physical properties of systems containing lanthanides. The phenomena are described and discussed in the following survey.

  3. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  4. Maintenance of ovulation inhibition with a new progestogen-only pill containing drospirenone after scheduled 24-h delays in pill intake

    DEFF Research Database (Denmark)

    Duijkers, Ingrid J M; Heger-Mahn, Doris; Drouin, Dominique

    2016-01-01

    by four placebo tablets. A previous study showed that this new drospirenone-only pill effectively inhibited ovulation. Clinical efficacy, however, can be affected by compliance, and delayed or forgotten pill intake often occurs in daily life. The aim of this study was to investigate if inhibition.......8%; only one subject in Group A fulfilled the ovulation criteria in Cycle 2. Follicular diameters in the regular-intake and the delayed-intake cycles were similar. CONCLUSION: Despite the 4-day hormone-free period and multiple intentional 24-h delays in tablet intake, ovulation inhibition was maintained...... inhibition by the new-generation oestrogen-free pill, containing 4-mg drospirenone for 24 days followed by a 4-day treatment-free period, was maintained despite four 24-h delays in tablet intake, so the impact of delayed intake on contraceptive reliability will be low....

  5. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  6. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  7. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  8. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  9. Preparation and characterization of macrocapsules containing microencapsulated PCMs (phase change materials) for thermal energy storage

    International Nuclear Information System (INIS)

    Han, Pengju; Lu, Lixin; Qiu, Xiaolin; Tang, Yali; Wang, Jun

    2015-01-01

    This paper was aimed to prepare, characterize and determine the comprehensive evaluation of promising composite macrocapsules containing microencapsulated PCMs (phase change materials) with calcium alginate gels as the matrix material. Macrocapsules containing microcapsules were fabricated by piercing-solidifying incuber method. Two kinds of microcapsules with n-tetradecane as core material, UF (urea-formaldehyde) and PMMA (poly(methyl methacrylate)) respectively as shell materials were prepared initially. For application concerns, thermal durability and mechanical property of macrocapsules were investigated by TGA (thermal gravimetric analysis) and Texture Analyser for the first time, respectively. The results showed excellent thermal stability and the compressive resistance of macrocapsules was sufficient for common application. The morphology and chemical structure of the prepared microcapsules and macrocapsules were characterized by SEM (scanning electron microscopy) and FT-IR (fourier transform infrared) spectroscopy method. Phase change behaviors and thermal durability of microcapsules and macrocapsules were investigated by DSC (differential scanning calorimetry). In order to improve latent heat of composite microcapsules, the core-shell weight ratio of tetradecane/UF shell microcapsules was chosen as 5.5:1 which obtained the phase change enthalpy of 194.1 J g −1 determined by DSC. In conclusion, these properties make it a feasible composite in applications of textile, building and cold-chain transportation. - Highlights: • We improved the phase change enthalpy with a higher core-shell ratio. • Urea-formaldehyde was firstly used as a shell material in the composite. • Mechanical and thermal durability property of the macrocapsules was firstly investigated in our work.

  10. Environmental monitoring master sampling schedule: January--December 1989

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1989-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1989 for the Surface and Ground-Water Environmental Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. This schedule includes routine ground-water sampling performed by PNL for Westinghouse Hanford Company, but does not include samples that may be collected in 1989 to support special studies or special contractor projects, or for quality control. The sampling schedule for Site-wide chemical monitoring is not included here, because it varies each quarter as needed, based on past results and operating needs. This schedule does not include Resource Conservation and Recovery Act ground-water sampling performed by PNL for Hanford Site contractors, nor does it include sampling that may be done by other DOE Hanford contractors

  11. Annual energy analysis of concrete containing phase change materials for building envelopes

    International Nuclear Information System (INIS)

    Thiele, Alexander M.; Jamet, Astrid; Sant, Gaurav; Pilon, Laurent

    2015-01-01

    Highlights: • Adding PCM to concrete walls can significantly reduce the cooling needs of buildings. • Climate, season, and wall orientation strongly affect energy and cost savings. • The PCM melting temperature should be near the desired indoor temperature. • Benefits are maximum for outdoor temperature oscillating around set indoor temperature. • Adding PCM had little effect on heating energy needs and associated cost savings. - Abstract: This paper examines the annual energy and cost savings potential of adding microencapsulated phase change material to the exterior concrete walls of an average-sized single family home in California climate zones 3 (San Francisco, CA) and 9 (Los Angeles, CA). The annual energy and cost savings were larger for South- and West-facing walls than for other walls. They were also the largest when the phase change temperature was near the desired indoor temperature. The addition of microencapsulated phase change material to the building walls reduced the cooling load in summer substantially more than the heating load in winter. This was attributed to the cold winter temperatures resulting in nearly unidirectional heat flux on many days. The annual cooling load reduction in an average-sized single family home in San Francisco and in Los Angeles ranged from 85% to 100% and from 53% to 82%, respectively, for phase change material volume fraction ranging from 0.1 to 0.3. The corresponding annual electricity cost savings ranged from $36 to $42 in San Francisco and from $94 to $143 in Los Angeles. From an energy standpoint, the best climate for using building materials containing uniformly distributed microencapsulated phase change material would have outdoor temperature oscillations centered around the desired indoor temperature for the entire year

  12. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  13. Study of improving the thermal response of a construction material containing a phase change material

    Science.gov (United States)

    Laaouatni, A.; Martaj, N.; Bennacer, R.; Elomari, M.; El Ganaoui, M.

    2016-09-01

    The use of phase change materials (PCMs) for improving the thermal comfort in buildings has become an attractive application. This solution contributes to increasing the thermal inertia of the building envelope and reducing power consumption. A building element filled with a PCM and equipped with ventilation tubes is proposed, both for increasing inertia and contributing to refreshing building envelope. A numerical simulation is conducted by the finite element method in COMSOL Multiphysics, which aims to test the thermal behaviour of the developed solution. An experimental study is carried out on a concrete block containing a PCM with ventilation tubes. The objective is to see the effect of PCM coupled with ventilation on increasing the inertia of the block. The results show the ability of this new solution to ensure an important thermal inertia of a building.

  14. Morphological changes during enhanced carbonation of asbestos containing material and its comparison to magnesium silicate minerals

    International Nuclear Information System (INIS)

    Gadikota, Greeshma; Natali, Claudio; Boschi, Chiara; Park, Ah-Hyung Alissa

    2014-01-01

    The disintegration of asbestos containing materials (ACM) over time can result in the mobilization of toxic chrysotile ((Mg, Fe) 3 Si 2 O 5 (OH) 4 )) fibers. Therefore, carbonation of these materials can be used to alter the fibrous morphology of asbestos and help mitigate anthropogenic CO 2 emissions, depending on the amount of available alkaline metal in the materials. A series of high pressure carbonation experiments were performed in a batch reactor at P CO2 of 139 atm using solvents containing different ligands (i.e., oxalate and acetate). The results of ACM carbonation were compared to those of magnesium silicate minerals which have been proposed to permanently store CO 2 via mineral carbonation. The study revealed that oxalate even at a low concentration of 0.1 M was effective in enhancing the extent of ACM carbonation and higher reaction temperatures also resulted in increased ACM carbonation. Formation of phases such as dolomite ((Ca, Mg)(CO 3 ) 2 ), whewellite (CaC 2 O 4 ·H 2 O) and glushinskite (MgC 2 O 4 ·2H 2 O) and a reduction in the chrysotile content was noted. Significant changes in the particle size and surface morphologies of ACM and magnesium silicate minerals toward non-fibrous structures were observed after their carbonation

  15. Morphological changes during enhanced carbonation of asbestos containing material and its comparison to magnesium silicate minerals

    Energy Technology Data Exchange (ETDEWEB)

    Gadikota, Greeshma [Department of Chemical Engineering, Columbia University, 500 West 120th Street, New York, NY 10027 (United States); Natali, Claudio; Boschi, Chiara [Institute of Geosciences and Earth Resources – National Research Council, Pisa (Italy); Park, Ah-Hyung Alissa, E-mail: ap2622@columbia.edu [Department of Earth and Environmental Engineering, Columbia University, 500 West 120th Street, New York, NY 10027 (United States); Department of Chemical Engineering, Columbia University, 500 West 120th Street, New York, NY 10027 (United States); Lenfest Center for Sustainable Energy, Columbia University, 500 West 120th Street, New York, NY 10027 (United States)

    2014-01-15

    The disintegration of asbestos containing materials (ACM) over time can result in the mobilization of toxic chrysotile ((Mg, Fe){sub 3}Si{sub 2}O{sub 5}(OH){sub 4})) fibers. Therefore, carbonation of these materials can be used to alter the fibrous morphology of asbestos and help mitigate anthropogenic CO{sub 2} emissions, depending on the amount of available alkaline metal in the materials. A series of high pressure carbonation experiments were performed in a batch reactor at P{sub CO2} of 139 atm using solvents containing different ligands (i.e., oxalate and acetate). The results of ACM carbonation were compared to those of magnesium silicate minerals which have been proposed to permanently store CO{sub 2} via mineral carbonation. The study revealed that oxalate even at a low concentration of 0.1 M was effective in enhancing the extent of ACM carbonation and higher reaction temperatures also resulted in increased ACM carbonation. Formation of phases such as dolomite ((Ca, Mg)(CO{sub 3}){sub 2}), whewellite (CaC{sub 2}O{sub 4}·H{sub 2}O) and glushinskite (MgC{sub 2}O{sub 4}·2H{sub 2}O) and a reduction in the chrysotile content was noted. Significant changes in the particle size and surface morphologies of ACM and magnesium silicate minerals toward non-fibrous structures were observed after their carbonation.

  16. Stittco Utilities Man Ltd. application for an interim ex parte order under section 45 of the Public Utilities Board Act for the approval of a change to its schedule of rates

    Energy Technology Data Exchange (ETDEWEB)

    1990-11-15

    Stittco Utilities, a company distributing propane in Manitoba, applied to the Manitoba Public Utilities Board for an interim order authorizing an increase in rates for all domestic and commercial customers in 3 Manitoba localities. The rate increase requested is based on the increase in the commodity price of propane and related changes in freight rates. If approved, the average rate will increase by ca 28% for residential customers and 27% for commercial customers. With the expectation that the price of propane would decrease in the near future, Stittco proposed to base its rates on a propane price lower than the current market price, in an effort to retain existing customers. Stittco also proposed to establish a variance account, in which the difference between the cost of propane built into the rates and the actual market price would be accumulated. From time to time Stittco would apply to adjust the rate schedule to refund overages or collect shortfalls contained in this variance account. It is Stittco's intention to cancel its new propane supply contract when propane prices stabilize and enter into a new fixed-price contract. Stittco would then apply for a new rate schedule based on the long-term price of propane. Based on the evidence, the Board decided that a prima facie case has been made showing a 105% increase in Stittco's cost of product and delivery, and that this increase should be passed through to Stittco customers effective November 16, 1990. Status reports were required for the variance account starting December 1990.

  17. Changes in polyphenol profile of dried apricots containing SO2 at various concentrations during storage.

    Science.gov (United States)

    Altındağ, Melek; Türkyılmaz, Meltem; Özkan, Mehmet

    2018-05-01

    Changes in polyphenols have important effects on the quality (especially color) and health benefits of dried apricots. SO 2 concentration, storage and the activities of polyphenol oxidase (PPO) and phenylalanine ammonia lyase (PAL) were factors which had significant effects on polyphenols. Polyphenol profile and activities of PPO and PAL in sulfured dried apricots (SDAs, 0, 451, 832, 2112 and 3241 mg SO 2 kg -1 ) were monitored during storage at 4, 20 and 30 °C for 379 days for the first time. Even the lowest SO 2 concentration (451 mg kg -1 ) was sufficient to inactivate PPO during the entire storage period. However, while SO 2 led to the increase in PAL activity of the samples (r = 0.767) before storage, PAL activities of SDAs decreased during storage. After 90 days of storage, PAL activity was determined in only non-sulfured dried apricots (NSDAs) and dried apricots containing 451 mg SO 2 kg -1 . Although the major polyphenol in NSDAs was epicatechin (611.4 mg kg -1 ), that in SDAs was chlorogenic acid (455-1508 mg kg -1 ), followed by epicatechin (0-426.8 mg kg -1 ), rutin (148.9-477.3 mg kg -1 ), ferulic acid (23.3-55.3 mg kg -1 ) and gallic acid (2.4-43.6 mg kg -1 ). After storage at 30 °C for 379 days, the major polyphenol in SDAs was gallic acid (706-2324 mg kg -1 ). However, the major polyphenol in NSDAs did not change after storage. The highest total polyphenol content was detected in SDAs containing 2112 mg SO 2 kg -1 and stored at 30 °C. To produce dried apricots having high polyphenol content, ∼2000 mg SO 2 kg -1 should be used. Low storage temperature (<30 °C) was not necessary for the protection of polyphenols. © 2017 Society of Chemical Industry. © 2017 Society of Chemical Industry.

  18. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  19. SOFIA's Choice: Automating the Scheduling of Airborne Observations

    Science.gov (United States)

    Frank, Jeremy; Norvig, Peter (Technical Monitor)

    1999-01-01

    This paper describes the problem of scheduling observations for an airborne telescope. Given a set of prioritized observations to choose from, and a wide range of complex constraints governing legitimate choices and orderings, how can we efficiently and effectively create a valid flight plan which supports high priority observations? This problem is quite different from scheduling problems which are routinely solved automatically in industry. For instance, the problem requires making choices which lead to other choices later, and contains many interacting complex constraints over both discrete and continuous variables. Furthermore, new types of constraints may be added as the fundamental problem changes. As a result of these features, this problem cannot be solved by traditional scheduling techniques. The problem resembles other problems in NASA and industry, from observation scheduling for rovers and other science instruments to vehicle routing. The remainder of the paper is organized as follows. In 2 we describe the observatory in order to provide some background. In 3 we describe the problem of scheduling a single flight. In 4 we compare flight planning and other scheduling problems and argue that traditional techniques are not sufficient to solve this problem. We also mention similar complex scheduling problems which may benefit from efforts to solve this problem. In 5 we describe an approach for solving this problem based on research into a similar problem, that of scheduling observations for a space-borne probe. In 6 we discuss extensions of the flight planning problem as well as other problems which are similar to flight planning. In 7 we conclude and discuss future work.

  20. Broadcast scheduling for mobile advertising

    OpenAIRE

    De Reyck, B.; Degraeve, Z.

    2003-01-01

    We describe a broadcast scheduling system developed for a precision marketing firm specialized in location-sensitive permission-based mobile advertising using SMS (Short Message Service) text messaging. Text messages containing advertisements were sent to registered customers when they were shopping in one of two shopping centers in the vicinity of London. The ads typically contained a limited-time promotional offer. The company's problem was deciding which ads to send out to which customers ...

  1. Pittsburgh International Airport - March 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  2. Pittsburgh International Airport - April 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  3. Pittsburgh International Airport - January 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  4. Pittsburgh International Airport - February 2018 Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  5. Physical and mechanical characterization of gypsum boards containing phase change materials for latent heat storage

    Directory of Open Access Journals (Sweden)

    Oliver-Ramírez, A.

    2011-09-01

    Full Text Available This article describes the design and manufacture of a gypsum board which, despite its 45 % wt content of phase change materials, meets the minimum physical and mechanical requirements laid down in the legislation on gypsum plasters (Spanish and European standard UNE EN 13279 and Spanish specifications for gypsum acceptance, RY 85. Under this design, a one-metre square, 1.5-cm thick board contains 4.75 kg of PCM, much more than in any prior drylining (the maximum attained to date is 3 kg per m2. The mechanical and physical characteristics of this new composite were previously improved with two joint-action additives: polypropylene fibres and melamine formaldehyde as a dispersing agent. In the 20-30 ºC temperature range, a gypsum board 1.5 cm thick containing this percentage of PCMs can store five times more thermal energy than conventional plasterboard of the same thickness, and the same amount of energy as half-foot hollow brick masonry.

    En esta investigación se ha diseñado y fabricado un panel de escayola que incorpora un 45% en peso de material de cambio de fase, manteniendo las propiedades físicas y mecánicas exigidas en la normativa de aplicación para yesos de construcción (UNE EN 13279 y referencias a la RY 85. Así, un panel de 1,0 m2 y 1,5 cm de espesor, contiene 4,75 kg de PCM, cantidad muy superior a la conseguida hasta la fecha (3 kg/m2. Para ello se ha mejorado previamente sus prestaciones mecánicas y físicas mediante adiciones binarias: fibras de polipropileno y dispersión de melanina formaldehído. Este porcentaje es capaz de almacenar en 1,5 cm de espesor cinco veces la energía térmica de un panel de cartón yeso con el mismo espesor y la misma cantidad que una fábrica de 1/2 pie de ladrillo hueco, en el rango de temperaturas próximas a la de confort (20-30 ºC.

  6. Increased container-breeding mosquito risk owing to drought-induced changes in water harvesting and storage in Brisbane, Australia.

    Science.gov (United States)

    Trewin, Brendan J; Kay, Brian H; Darbro, Jonathan M; Hurst, Tim P

    2013-12-01

    Extended drought conditions in south-east Queensland during the early 2000s have resulted in a culture of water harvesting and legislated water restrictions. Aedes notoscriptus is a container-breeding mosquito vector of Ross River and Barmah Forest viruses. From 2008-2009, the larval habitats and seasonal abundance of domestic container-breeding mosquitoes were recorded from three suburbs of Brisbane. A knowledge, attitudes and practice questionnaire was administered to householders. A low-cost, desktop methodology was used to predict the proportion of shaded premises compared with front-of-property estimates. We highlight changes in the frequency of container categories for A. notoscriptus as a response to human behavioural changes to drought. Garden accoutrements, discarded household items and water storage containers accounted for 66.2% (525/793) of positive containers and 77.5% (73 441/94 731) of all immature mosquitoes. Of all household premises surveyed, 52.6% (550/1046) contained rainwater tanks and 29.4% (308/1046) harvested water in other containers, contrasting with a previous 1995 survey where neither category was observed. Both Premise Condition Index and shade directly correlated with positive premises. Human response to drought has resulted in new habitats for domestic container-breeding mosquitoes. This recent trend of prolific water storage is similar to earlier years (1904-1943) in Brisbane when Aedes aegypti was present and dengue epidemics occurred.

  7. Analysis of containment pressure and temperature changes following loss of coolant accident (LOCA)

    International Nuclear Information System (INIS)

    Nguyen Van Thai; Kieu Ngoc Dung

    2015-01-01

    This paper present a preliminary thermal-hydraulics analysis of AP1000 containment following loss of coolant accident events such as double-end cold line break (DECLB) or main steam line break (MSLB) using MELCOR code. A break of this type will produce a rapid depressurization of the reactor pressure vessel (primary system) and release initially high pressure water into the containment followed by a much smaller release of highly superheated steam. The high pressure liquid water will flash and rapidly pressurize the containment building. The performance of passive containment cooling system for steam removal by condensation on large steel containment structure is a major contributing process, controlling the pressure and temperature maximum reached during the accident event. The results are analyzed, discussed and compared with the similar work done by Sandia National Laboratories. (author)

  8. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  9. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  10. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  11. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  12. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  13. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  14. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  15. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  16. Flexible Schedules and Shift Work.

    Science.gov (United States)

    Beers, Thomas M.

    2000-01-01

    Flexible work hours have gained prominence, as more than 25 million workers (27.6% of all full-time workers) can now vary their schedules. However, there has been little change since the mid-1980s in the proportion who work a shift other than a regular daytime shift. (JOW)

  17. The macronutrients in human milk change after storage in various containers.

    Science.gov (United States)

    Chang, Yu-Chuan; Chen, Chao-Huei; Lin, Ming-Chih

    2012-06-01

    The concentrations of macronutrients in human milk can be influenced by various processes, such as storage, freezing, and thawing, that are performed by lactating working mothers and breast milk banks. We evaluated the impact of various containers on the nutrient concentrations in human milk. A total of 42 breast milk samples from 18 healthy lactating mothers were collected. A baseline macronutrient concentration was determined for each sample. Then, the breast milk samples were divided and stored in nine different commercial milk containers. After freezing at -20°C for 2 days, the milk samples were thawed and analyzed again. A midinfrared human milk analyzer (HMA) was used to measure the protein, fat, and carbohydrate contents. There was a significant decrease in the fat content following the storage, freezing, and thawing processes, ranging from 0.27-0.30 g/dL (p=0.02), but no significant decrease in energy content (p=0.069) was noted in the nine different containers. There were statistically significant increases in protein and carbohydrate concentrations in all containers (p=0.021 and 0.001, respectively), however there were no significant differences between the containers in terms of fat, protein, carbohydrate, or energy contents. Human milk, when subjected to storage, freezing, and thawing processes, demonstrated a significant decrease in fat content (up to 9% reduction) in various containers. It is better for infants to receive milk directly from the mother via breastfeeding. More studies are warranted to evaluate the effects of milk storage on infant growth and development. Copyright © 2012. Published by Elsevier B.V.

  18. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different....... Compared to the predictions of an analyst observing untolled equilibrium and taking scheduling preferences as exogenous, we find that both the optimal capacity and the marginal external cost of congestion have changed. The benefits of tolling are greater, and the optimal time varying toll is different....

  19. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  20. Investigation of morphological changes in platinum-containing nanostructures created by electron-beam-induced deposition

    NARCIS (Netherlands)

    Botman, A.; Hesselberth, M.; Mulders, J.J.L.

    2008-01-01

    Focused electron-beam-induced deposition (EBID) allows the rapid fabrication of three-dimensional nanodevices and metallic wiring of nanostructures, and is a promising technique for many applications in nanoresearch. The authors present two topics on platinum-containing nanostructures created by

  1. 21 CFR 113.83 - Establishing scheduled processes.

    Science.gov (United States)

    2010-04-01

    ... commercial production runs should be determined on the basis of recognized scientific methods to be of a size... CONTAINERS Production and Process Controls § 113.83 Establishing scheduled processes. Scheduled processes for... production shall be adequately provided for in establishing the scheduled process. Critical factors, e.g...

  2. Perceptions of Teachers in South Florida Toward Block Scheduling.

    Science.gov (United States)

    Hamdy, Mona; Urich, Ted

    1998-01-01

    A study was conducted at two metropolitan South Florida high schools to determine perceptions of 100 teachers concerning block scheduling. Teachers felt that the 4 X 4 block schedule contained too many time gaps for teaching foreign languages, English, and math. Teachers believed block schedules benefitted advanced students more than others and…

  3. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  4. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project

  5. The Benefits of Incorporating Shipping Containers into the Climate Change Adaption Plans at NASA Wallops Flight Facility

    Science.gov (United States)

    Hamilton, Carl Kenneth Gonzaga

    2017-01-01

    The National Aeronautics and Space Administration has several centers and facilities located near the coast that are undoubtedly susceptible to climate change. One of those facilities is Wallops Flight Facility on the Eastern Shore of Virginia which is separated into three areas: Main Base, Mainland, and the Island. Wallops Island has numerous buildings and assets that are vulnerable to flood inundation, intense storms, and storm surge. The shoreline of Wallops Island is prone to beach erosion and is slated for another beach replenishment project in 2019. In addition, current climate projections for NASAs centers and facilities, conducted by the Climate Adaptation Science Investigators, warn of inevitable increases in annual temperature, precipitation, sea level rise, and extreme events such as heat waves. The aforementioned vulnerabilities Wallops Island faces in addition to the projections of future climate change reveal an urgency for NASA to adjust how new buildings at its centers and facilities near the coast are built to adapt to the inevitable effects of climate change. Although the agency has made strides to mitigate the effects of climate change by incorporating L.E.E.D. into new buildings that produce less greenhouse gas, the strides for the agency to institute clear climate adaptation policies for the buildings at its centers and facilities near the coast seem to lag behind. As NASA continues to formulate formidable climate change adaptation plans for its centers and facilities, an architectural trend that should be examined for its potential to replace several old buildings at Wallops Island is shipping containers buildings. Shipping containers or Intermodal Steel Building Units offer an array of benefits such as strength, durability, versatility, modular, and since they can be upcycled, they are also eco-friendly. Some disadvantages of shipping containers are they contain harmful chemicals, insulation must be added, fossil fuels must be used to

  6. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  7. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  8. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  9. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  10. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  11. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  12. Application of the Finite Elemental Analysis to Modeling Temperature Change of the Vaccine in an Insulated Packaging Container during Transport.

    Science.gov (United States)

    Ge, Changfeng; Cheng, Yujie; Shen, Yan

    2013-01-01

    This study demonstrated an attempt to predict temperatures of a perishable product such as vaccine inside an insulated packaging container during transport through finite element analysis (FEA) modeling. In order to use the standard FEA software for simulation, an equivalent heat conduction coefficient is proposed and calculated to describe the heat transfer of the air trapped inside the insulated packaging container. The three-dimensional, insulated packaging container is regarded as a combination of six panels, and the heat flow at each side panel is a one-dimension diffusion process. The transit-thermal analysis was applied to simulate the heat transition process from ambient environment to inside the container. Field measurements were carried out to collect the temperature during transport, and the collected data were compared to the FEA simulation results. Insulated packaging containers are used to transport temperature-sensitive products such as vaccine and other pharmaceutical products. The container is usually made of an extruded polystyrene foam filled with gel packs. World Health Organization guidelines recommend that all vaccines except oral polio vaccine be distributed in an environment where the temperature ranges between +2 to +8 °C. The primary areas of concern in designing the packaging for vaccine are how much of the foam thickness and gel packs should be used in order to keep the temperature in a desired range, and how to prevent the vaccine from exposure to freezing temperatures. This study uses numerical simulation to predict temperature change within an insulated packaging container in vaccine cold chain. It is our hope that this simulation will provide the vaccine industries with an alternative engineering tool to validate vaccine packaging and project thermal equilibrium within the insulated packaging container.

  13. The behavior of self-compacting concrete containing micro-encapsulated phase change materials

    NARCIS (Netherlands)

    Hunger, Martin; Entrop, Alexis Gerardus; Mandilaras, I.; Brouwers, Jos; Founti, M.

    2009-01-01

    In order to come to a sustainable built environment the construction industry requires new energy saving concepts. One concept is to use Phase Change Materials (PCM), which have the ability to absorb and to release thermal energy at a specific temperature. This paper presents a set of experiments

  14. Latent heat storage by silica-coated polymer beads containing organic phase change materials

    Czech Academy of Sciences Publication Activity Database

    Feczkó, T.; Trif, L.; Horák, Daniel

    2016-01-01

    Roč. 132, July (2016), s. 405-414 ISSN 0038-092X R&D Projects: GA MŠk(CZ) LH14318 Institutional support: RVO:61389013 Keywords : latent heat storage * phase change materials * porous beads by suspension polymerization Subject RIV: CD - Macromolecular Chemistry Impact factor: 4.018, year: 2016

  15. The behavior of self-compacting concrete containing micro-encapsulated Phase Change Materials

    NARCIS (Netherlands)

    Hunger, M.; Entrop, A.G.; Mandilaras, I.; Brouwers, H.J.H.; Founti, M.

    2009-01-01

    In order to come to a sustainable built environment the construction industry requires new energy saving concepts. One concept is to use Phase Change Materials (PCM), which have the ability to absorb and to release thermal energy at a specific temperature. This paper presents a set of experiments

  16. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  17. Characterization of a lime-pozzolan plaster containing phase change material

    International Nuclear Information System (INIS)

    Pavlíková, Milena; Pavlík, Zbyšek; Trník, Anton; Pokorný, Jaroslav; Černý, Robert

    2015-01-01

    A PCM (Phase Change Material) modified lime-pozzolan plaster for improvement of thermal energy storage of building envelopes is studied in the paper. The investigated plaster is composed of lime hydrate, pozzolan admixture based on metakaolin and mudstone, silica sand, water and paraffin wax encapsulated in polymer capsule. The reference plaster without PCM application is studied as well. The analyzed materials are characterized by bulk density, matrix density, total open porosity, compressive strength and pore size distribution. The temperature of phase change, heat of fusion and crystallization are studied using DSC (Difference Scanning Calorimetry) analysis performed in air atmosphere. In order to get information on materials hygrothermal performance, determination of thermal and hygric properties is done in laboratory conditions. Experimental data reveal a substantial improvement of heat storage capacity of PCM-modified plaster as compared to the reference material without PCM

  18. Rheological and thermal properties of suspensions of microcapsules containing phase change materials.

    Science.gov (United States)

    Cao, Vinh Duy; Salas-Bringas, Carlos; Schüller, Reidar Barfod; Szczotok, Anna M; Hiorth, Marianne; Carmona, Manuel; Rodriguez, Juan F; Kjøniksen, Anna-Lena

    2018-01-01

    The thermal and rheological properties of suspensions of microencapsulated phase change materials (MPCM) in glycerol were investigated. When the microcapsule concentration is raised, the heat storage capacity of the suspensions becomes higher and a slight decline in the thermal conductivity of the suspensions is observed. The temperature-dependent shear-thinning behaviour of the suspensions was found to be strongly affected by non-encapsulated phase change materials (PCM). Accordingly, the rheological properties of the MPCM suspensions could be described by the Cross model below the PCM melting point while a power law model best described the data above the PCM melting point. The MPCM suspensions are interesting for energy storage and heat transfer applications. However, the non-encapsulated PCM contributes to the agglomeration of the microcapsules, which can lead to higher pumping consumption and clogging of piping systems.

  19. Comparison of chemical changes during photooxidation of polypropylene film and filament containing phthalocyanine pigment

    International Nuclear Information System (INIS)

    Ahmadi, Z.; Haghighat Kish, M.; Kotak, R.; Katbab, A. A.

    2008-01-01

    Photooxidation as an important process, which significantly affects the service life of the polypropylene products, has been the subject of much theoretical and experimental study. Pigments used often change the light stabilities of polypropylene. Out-door applications of pigmented polypropylene are now increasingly developed in products such as artificial grass. The aim of this work is to examine the effect of photo-oxidation on the structure of isotactic polypropylene (iPP) in film and filament forms, where phthalocyanine pigment is used. For production of films and filaments, iPP granules with MFI 25 g/10 min were used, with and without phthalocyanine pigment. Samples were exposed to xenon lamp for various time lengths. The extent of the changes in chemical and structural parameters was examined by differential scanning calorimetry, Fourier transform infrared spectroscopy and wide angle x-ray diffraction. The results show that carbonyl and hydroperoxide indices increase during the exposure to the radiation. The changes in melting points of the samples were not significant after irradiation process. The effects of phthalocyanine pigment in the photooxidation of film and filament were different. Crystalline fractions of the non-pigmented filament samples decreased during the irradiation time while increased in film samples. Build up of hydroperoxide and carbonyl group in filament was higher than in film samples; that could be due to the differences in structural parameters. Crystallinity variations during photooxidation are related to the nucleation effect of the pigment, chemical crystallization and phase transformation

  20. Comparison of Chemical Changes During Photooxidation of Polypropylene Film and Filament Containing Phthalocyanine Pigment

    Directory of Open Access Journals (Sweden)

    Z. Ahmadi

    2008-02-01

    Full Text Available Photooxidation as an important process, which significantly affects the service life of the polypropylene products, has been the subject of much theoretical and experimental study. Pigments used often change the light stabilities of polypropylene. Out-door applications of pigmented polypr-opylene are now increasingly developed in products such as artificial grass. The aim of this work is to examine the effect of photo-oxidation on the structure of isotactic polypropylene (iPP in film and filament forms, where phthalocyanine pigment is used. For production of films and filaments, iPP granules with MFI 25 g/10min were used, with and without phthalocyanine pigment. Samples were exposed to xenon lamp for various time lengths. The extent of the changes in chemical and structural parameters was examined by differential scanning calorimetry, Fourier transform infrared spectroscopy and wide angle x-ray diffraction. The results show that carbonyl and hydroperoxide indices increase during the exposure to the radiation. The changes in melting points of the samples were not significant after irradiation process. The effects of phthalocyanine pigment in the photooxidation of filmand filament were different. Crystalline fractions of the non-pigmented filament samples decreased during the irradiation time while increased in film samples. Build up of hydroperoxide and carbonyl group in filament was higher than in film samples; that could be due to the differences in structural parameters. Crystallinity variations during photooxidation are related to the nucleation effect of the pigment, chemical crystallization and phase transformation.

  1. Characteristics of phase-change materials containing oxide nano-additives for thermal storage.

    Science.gov (United States)

    Teng, Tun-Ping; Yu, Chao-Chieh

    2012-11-06

    In this study, the authors report the production of nanocomposite-enhanced phase-change materials (NEPCMs) using the direct-synthesis method by mixing paraffin with alumina (Al2O3), titania (TiO2), silica (SiO2), and zinc oxide (ZnO) as the experimental samples. Al2O3, TiO2, SiO2, and ZnO were dispersed into three concentrations of 1.0, 2.0, and 3.0 wt.%. Through heat conduction and differential scanning calorimeter experiments to evaluate the effects of varying concentrations of the nano-additives on the heat conduction performance and thermal storage characteristics of NEPCMs, their feasibility for use in thermal storage was determined. The experimental results demonstrate that TiO2 is more effective than the other additives in enhancing both the heat conduction and thermal storage performance of paraffin for most of the experimental parameters. Furthermore, TiO2 reduces the melting onset temperature and increases the solidification onset temperature of paraffin. This allows the phase-change heat to be applicable to a wider temperature range, and the highest decreased ratio of phase-change heat is only 0.46%, compared to that of paraffin. Therefore, this study demonstrates that TiO2, added to paraffin to form NEPCMs, has significant potential for enhancing the thermal storage characteristics of paraffin.

  2. Scheduling drayage operations in synchromodal transport

    NARCIS (Netherlands)

    Rivera, Arturo E.Pérez; Mes, Martijn R.K.; Bektas, Tolga; Coniglio, Stefano; Martinez-Sykora, Antonio; Voss, Stefan

    2017-01-01

    We study the problem of scheduling drayage operations in synchromodal transport. Besides the usual decisions to time the pick-up and delivery of containers, and to route the vehicles that transport them, synchromodal transport includes the assignment of terminals for empty and loaded containers. The

  3. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  4. 29 CFR 825.202 - Intermittent leave or reduced leave schedule.

    Science.gov (United States)

    2010-07-01

    ... leave schedule is a leave schedule that reduces an employee's usual number of working hours per workweek, or hours per workday. A reduced leave schedule is a change in the employee's schedule for a period of... 29 Labor 3 2010-07-01 2010-07-01 false Intermittent leave or reduced leave schedule. 825.202...

  5. Experimental Investigation of Thermal Conductivity of Concrete Containing Micro-Encapsulated Phase Change Materials

    DEFF Research Database (Denmark)

    Pomianowski, Michal Zbigniew; Heiselberg, Per; Jensen, Rasmus Lund

    2011-01-01

    in this article utilizes integration of the concrete and the microencapsulated Phase Change Material (PCM). PCM has the ability to absorb and release significant amounts of heat at a specific temperature range. As a consequence of admixing PCM to the concrete, new thermal properties like thermal conductivity...... and specific heat capacity have to be defined. This paper presents results from the measurements of the thermal conductivity of various microencapsulated PCM-concrete and PCM-cement-paste mixes. It was discovered that increase of the amount of PCM decreases the thermal conductivity of the concrete PCM mixture....... Finally, a theoretical calculation methodology of thermal conductivity for PCM-concrete mixes is developed....

  6. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  7. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  8. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  9. UV irradiation-initiated MMA polymerization to prepare microcapsules containing phase change paraffin

    Energy Technology Data Exchange (ETDEWEB)

    Ma, Sude; Song, Guolin; Li, Wei; Fan, Pengfei; Tang, Guoyi [Institute of Advanced Materials, Graduated School at Shenzhen, Tsinghua University, Shenzhen 518055 (China)

    2010-10-15

    Microencapsulated phase change material (MEPCM), paraffin, with polymethylmethacrylate shell was prepared by introducing UV irradiation to an O/W emulsion polymerization for approximately 30 min under constant stirring. The results of differential scanning calorimetry analyses indicate that the latent heat and the content of paraffin of microcapsules are 101 J g{sup -1} and 61.2 wt%, respectively. The phase transition temperature of MEPCM ranges from 24 to 33 C. The MEPCM was characterized using scanning electron microscopy and Fourier transform infrared spectroscopy. Thermal gravimetric analysis results show that the MEPCM is degraded into two distinguishable steps. Accelerated thermal cycling tests also indicate that the MEPCM displays a good thermal reliability. Gypsum boards composed of as-prepared MEPCM show a good temperature-regulated property. Based on all these results, it can be concluded that the microencapsulated paraffin as MEPCMs have good potential for thermal energy storage purposes such as phase change material slurries, solar space heating applications, textiles and building materials. (author)

  10. Change in the microbiocenosis of waste waters containing SPAV under the influence of electrocoagulation

    Energy Technology Data Exchange (ETDEWEB)

    Klyshko, G.M.; Prokazov, G.F.; Zimenko, T.G.

    1981-01-01

    The change in the microbial cenosis of industrial waste waters during their treatment by the method of electrocoagulation was investigated. The bactericidal action of electrocoagulation on the microflora was ascertained. The total count of microorganisms and the number of individual groups of microbes under the influence of the treatment decreased by a factor of ten, and the content of bacteria of the E. coli group - by a factor of several thousand. On treatment of the waste waters with an electrical current voltage of 80 V complete removal of chromium and reduction in SPAV content by 45% were obtained. The method can be used for local purification of waste waters from leather-tanning kombinats.

  11. Comparing systolic and diastolic Blood pressure changes and heartbeat rate following administration of anesthetics containing epinephrine and felypressin

    Directory of Open Access Journals (Sweden)

    M. Jafari

    1998-05-01

    Full Text Available   Complex mechanisms have been known for keeping blood pressure in normal level. In fact, these mechanisms have inter-related functions and can be dysregulated by both internal and external stimuli while cardiovascular system functions to minimize these changes. Vasoconstrictors can cause clinical and hemodynamical changes as 1-2 cartridges of epinephrine containing lidocaine can has no considerable effects in a normal individual ( unless administered IV but 3 cartridges can bring about some clinical symptoms, according to a number of investigations. In current study, epinephrine’s effect on heartbeat rate was found more potent than felypressin which is considered as a disadvantage. on the other hand, epinephrine acts on arteries and can cause less bleeding, less drug toxicity and deeper and longer anesthesia. Therefore, it is preferred to felypressin due to its better action. It should be noted that the changes resulted by epinephrine and felypressin are of no significant importance in healthy individuals.

  12. Alternative Work Schedules in Office and Nonoffice Work Settings.

    Science.gov (United States)

    Kirk, Raymond J.; Barton, H. David

    A rapidly growing change in the workplace is the replacement of a fixed work schedule with a variety of alternative work schedules (AWS), including both flexible and compressed schedules. Experimenting organizations (N=901) evaluated one of four major categories of AWS in office and nonoffice settings, i.e., a flexible 8-hour day;…

  13. A numerical study of external building walls containing phase change materials (PCM)

    International Nuclear Information System (INIS)

    Izquierdo-Barrientos, M.A.; Belmonte, J.F.; Rodríguez-Sánchez, D.; Molina, A.E.; Almendros-Ibáñez, J.A.

    2012-01-01

    Phase Change Materials (PCMs) have been receiving increased attention, due to their capacity to store large amounts of thermal energy in narrow temperature ranges. This property makes them ideal for passive heat storage in the envelopes of buildings. To study the influence of PCMs in external building walls, a one-dimensional transient heat transfer model has been developed and solved numerically using a finite difference technique. Different external building wall configurations were analyzed for a typical building wall by varying the location of the PCM layer, the orientation of the wall, the ambient conditions and the phase transition temperature of the PCM. The integration of a PCM layer into a building wall diminished the amplitude of the instantaneous heat flux through the wall when the melting temperature of the PCM was properly selected according to the season and wall orientation. Conversely, the results of the work show that there is no significant reduction in the total heat lost during winter regardless of the wall orientation or PCM transition temperature. Higher differences were observed in the heat gained during the summer period, due to the elevated solar radiation fluxes. The high thermal inertia of the wall implies that the inclusion of a PCM layer increases the thermal load during the day while decreasing the thermal load during the night. - Highlights: ► A comparative simulation of a building wall with and without PCMs has been conducted. ► PCM is selected according with the season, the wall orientation and the melting temperature. ► PCM in a building wall help to diminish the internal air temperature swings and to regulate the heat transfer.

  14. Small angle X-ray scattering study of thermodynamic and conformational changes in ion-containing symmetric diblock copolymers

    Energy Technology Data Exchange (ETDEWEB)

    Gunkel, Ilja [Max Planck Institute of Microstructure Physics, Halle (Germany); Institute of Physics, Martin Luther University Halle Wittenberg, Halle (Germany); Thurn-Albrecht, Thomas [Institute of Physics, Martin Luther University Halle Wittenberg, Halle (Germany)

    2010-07-01

    We present temperature-dependent SAXS measurements on two different symmetric block copolymers with added salt (lithiumtriflate, LiCF{sub 3}SO{sub 3}). For both studied systems, polystyrene-b-poly-2-vinylpyridine (PS-b-P2VP) and Polystyrene-b-Polyethyleneoxide (PS-b-PEO), the salt selectively dissolved in one block leading to large increases of the order-disorder transition temperatures (T{sub ODT}). In addition, the lamellar thickness of these ion-containing block copolymers nontrivially changed above a certain salt concentration - in PS-b-P2VP the lamellae became thicker whereas their thickness decreased in PS-b-PEO. Using basic arguments of the thermodynamics of block copolymers we were able to separate the ion-induced increase of T{sub ODT} due to a higher incompatibility between the different blocks from changes in the thickness of the lamellae at T{sub ODT} resulting from changes in the conformation of the ion-containing blocks.

  15. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  16. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  17. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  18. CERN confirms LHC schedule

    CERN Document Server

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  19. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  20. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  1. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  2. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  3. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  4. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  5. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  6. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  7. Preparation, characterization and thermal properties of nanocapsules containing phase change material n-dodecanol by miniemulsion polymerization with polymerizable emulsifier

    International Nuclear Information System (INIS)

    Chen, Zhong-Hua; Yu, Fei; Zeng, Xing-Rong; Zhang, Zheng-Guo

    2012-01-01

    Highlights: ► We prepare nanocapsules containing n-dodecanol via miniemulsion polymerization. ► Polymerizable emulsifier plays important role in the preparation of nanocapsules. ► Adding co-emulsifier into water phase is helpful to encapsulate n-dodecanol. ► The phase change latent heat of nanocapsule is 98.8 J/g with temperature of 18.2 °C. -- Abstract: Nanocapsules containing phase change material (PCM) n-dodecanol as core and polymethyl methacrylate (PMMA) as shell were synthesized by miniemulsion polymerization with polymerizable emulsifier DNS-86 and co-emulsifier hexadecane (HD). The nanocapsules were characterized by using Fourier transform infrared spectroscopy (FTIR), transmission electron microscope (TEM), differential scanning calorimetry (DSC), thermogravimetric analysis (TGA) and laser particle diameter analyzer. The effects of polymerizable emulsifier and co-emulsifier on the properties of nanocapsules were studied. The results show that thermal properties of nanocapsules are affected greatly by the addition methods of HD and the amounts of DNS-86 and HD. Adding HD into water phase is helpful for the encapsulation of n-dodecanol. When the mass ratios of DNS-86 to n-dodecanol and the mass ratios of HD to n-dodecanol were 3% and 2%, the phase change latent heat and the encapsulation efficiency of nanocapsules reached to the maximum value of 98.8 J/g and 82.2%, respectively. Spherical nanocapsules with mean diameter of 150 nm and phase change temperature of 18.2 °C are obtained, which are sure to have a good potential for energy storage.

  8. Changes in mechanical properties following cyclic prestressing of martensitic steel containing vanadium carbide in presence of nondiffusible hydrogen

    Energy Technology Data Exchange (ETDEWEB)

    Kaneko, Mao; Doshida, Tomoki [Graduate School of Science and Technology, Sophia University, Tokyo 102-8554 (Japan); Takai, Kenichi, E-mail: takai@me.sophia.ac.jp [Department of Engineering and Applied Science, Sophia University, Tokyo 102-8554 (Japan)

    2016-09-30

    Changes in the states of nondiffusible hydrogen and mechanical properties after cyclic prestressing in the presence of only nondiffusible hydrogen were examined for martensitic steel containing vanadium carbide. The relationship between the change in the state of nondiffusible hydrogen and mechanical properties was also investigated. The hydrogen desorption profile in the high-temperature range decreased and that in the low-temperature range increased with increasing stress amplitude during cyclic prestressing in the presence of only nondiffusible hydrogen. Thus, the application of cyclic prestressing changed the state of hydrogen from a stable to an unstable one because of vacancies and their clusters. Hydrogen embrittlement susceptibility after cyclic prestressing increased with increasing stress amplitude and number of prestressing cycles in the presence of only nondiffusible hydrogen. This relationship indicates that hydrogen embrittlement susceptibility increased with the increasing amount of hydrogen detrapped from trap sites of nondiffusible hydrogen during cyclic prestressing. These results revealed that nondiffusible hydrogen easily detrapped from vanadium carbide due to the application of cyclic prestress and probably interacted with vacancies and their clusters, thus increasing hydrogen embrittlement susceptibility. The change of nondiffusible hydrogen to diffusible hydrogen and accumulation of vacancies and their clusters during cyclic prestressing are concluded to be the dominant factors in hydrogen embrittlement after the application of cyclic prestress.

  9. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  10. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  11. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  12. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  13. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  14. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  15. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  16. Reactor container

    International Nuclear Information System (INIS)

    Naruse, Yoshihiro.

    1990-01-01

    The thickness of steel shell plates in a reactor container embedded in sand cussions is monitored to recognize the corrosion of the steel shell plates. That is, the reactor pressure vessel is contained in a reactor container shell and the sand cussions are disposed on the lower outside of the reactor container shell to elastically support the shell. A pit is disposed at a position opposing to the sand cussions for measuring the thickness of the reactor container shell plates. The pit is usually closed by a closing member. In the reactor container thus constituted, the closing member can be removed upon periodical inspection to measure the thickness of the shell plates. Accordingly, the corrosion of the steel shell plates can be recognized by the change of the plate thickness. (I.S.)

  17. Crane Scheduling on a Plate Storage

    DEFF Research Database (Denmark)

    Hansen, Jesper

    2002-01-01

    OSS produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until they are needed in production. Two gantry cranes carry out this task. The planning task is now to create a schedule of movements for the 2 cranes...

  18. 21 CFR 1308.12 - Schedule II.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule II. 1308.12 Section 1308.12 Food and... 9733 (26) Remifentanil 9739 (27) Sufentanil 9740 (28) Tapentadol 9780 (d) Stimulants. Unless... which contains any quantity of the following substances having a stimulant effect on the central nervous...

  19. 21 CFR 1308.15 - Schedule V.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule V. 1308.15 Section 1308.15 Food and Drugs... not less than 25 micrograms of atropine sulfate per dosage unit. (d) Stimulants. Unless specifically... which contains any quantity of the following substances having a stimulant effect on the central nervous...

  20. Intelligence amplification framework for enhancing scheduling processes

    NARCIS (Netherlands)

    Dobrkovic, Andrej; Liu, Luyao; Iacob, Maria Eugenia; van Hillegersberg, Jos

    2016-01-01

    The scheduling process in a typical business environment consists of predominantly repetitive tasks that have to be completed in limited time and often containing some form of uncertainty. The intelligence amplification is a symbiotic relationship between a human and an intelligent agent. This

  1. Genetic algorithm to solve the problems of lectures and practicums scheduling

    Science.gov (United States)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  2. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  3. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  4. Evaluation of a twelve-hour/day shift schedule

    International Nuclear Information System (INIS)

    Lewis, P.M.; Swaim, D.J.

    1986-01-01

    In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8-hour to a 12-hour a day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off-the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility

  5. The Growing Diversity of Work Schedules.

    Science.gov (United States)

    Smith, Shirley J.

    1986-01-01

    The author highlights the predominance of the five-day, 40-hour workweek. Although finding little change in recent years in the proportion of workers on 40-hour schedules, Smith notes that there have been some changes in work patterns, with a still small but growing group of workers on "compressed" full-time weeks of less than five days.…

  6. Development and use of schedules in education of elementary school children with ASD

    Directory of Open Access Journals (Sweden)

    Sharova Y.A.

    2015-09-01

    Full Text Available The work on preparedness for education of elementary school students with autism disorders can be greatly facilitated by the use of the methods that allow to structure child's knowledge about necessary changes. The use of schedules greatly facilitates the process of education, guiding and work on children's adaptation. The article describes stages of the work on inclusion and use of general and individual schedules in two groups of children with intellectual disabilities and autism spectrum disorders in preschool classes. This work was conducted in the Center for Psychological, Medical and Social Support to Children and Adolescents of the Moscow State University of Psychology and Education. The article contains examples of the use schedules to increase independence and to reduce anxiety in children with autism spectrum disorders.

  7. Analysis study on change of tendon behavior during pressurization process of Pre-stressed Concrete Containment Vessel

    International Nuclear Information System (INIS)

    Kashiwase, Takako; Nagasaka, Hideo

    1999-01-01

    NUPEC has been planning the ultimate strength test of Pre-stressed Concrete Containment Vessel (PCCV). The test model is 1/4 uniform scale model of Japan actual PCCV. It involves an equipment hatch, several penetrations and liner with T-anchors. The ancillary test for the PCCV test was conducted, in which friction coefficient of hoop tendon was evaluated by tensile force distribution using the same tendon as that of 1/4 PCCV model. Tendon will be in plastic region under internal pressure above 3.5 times design pressure (Pd) and surface characteristic of tendon and the resultant friction coefficient will be changed. In the present paper, tendon friction coefficient in the plastic region was obtained by evaluating plastic region data of tendon in the ancillary test. The validity of the obtained friction coefficient was confirmed by the tendon elongation data. In addition to the formally developed elastic region friction coefficient, the obtained plastic region correlation was incorporated into ABAQUS Ver. 5.6. The effect of tendon tensile force distribution change on structural behavior up to 3.8 Pd was evaluated. (author)

  8. Numerical Study of Solidification in a Plate Heat Exchange Device with a Zigzag Configuration Containing Multiple Phase-Change-Materials

    Directory of Open Access Journals (Sweden)

    Peilun Wang

    2016-05-01

    Full Text Available Latent heat thermal energy storage (TES plays an important role in the advocation of TES in contrast to sensible energy storage because of the large storage energy densities per unit mass/volume possible at a nearly constant thermal energy. In the current study, a heat exchange device with a zigzag configuration containing multiple phase-change-materials (m-PCMs was considered, and an experimental system was built to validate the model for a single PCM. A two-dimensional numerical model was developed using the ANSYS Fluent 14.0 software program. The energy fractions method was put forward to calculate the average Ste number and the influence of Re and Ste numbers on the discharge process were studied. The influence of phase change temperature among m-PCMs on the solidification process has also been studied. A new boundary condition was defined to determine the combined effect of the Re and Ste numbers on the discharging process. The modelling results show that for a given input power, the Ste (or Re number has a significant impact on the discharging process; however, the period value of inlet velocity has almost no impact on it. Besides, the zigzag plate with m-PCMs has a good impact on the temperature shock as “filter action” in the discharging process.

  9. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  10. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  11. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  12. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  13. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  14. Synthesis and Characterization of Microencapsulated Phase Change Materials with Poly(urea-urethane) Shells Containing Cellulose Nanocrystals.

    Science.gov (United States)

    Yoo, Youngman; Martinez, Carlos; Youngblood, Jeffrey P

    2017-09-20

    The main objective of this study is to develop microencapsulation technology for thermal energy storage incorporating a phase change material (PCM) in a composite wall shell, which can be used to create a stable environment and allow the PCM to undergo phase change without any outside influence. Surface modification of cellulose nanocrystals (CNCs) was conducted by grafting poly(lactic acid) oligomers and oleic acid to improve the dispersion of nanoparticles in a polymeric shell. A microencapsulated phase change material (methyl laurate) with poly(urea-urethane) (PU) composite shells containing the hydrophobized cellulose nanocrystals (hCNCs) was fabricated using an in situ emulsion interfacial polymerization process. The encapsulation process of the PCMs with subsequent interfacial hCNC-PU to form composite microcapsules as well as their morphology, composition, thermal properties, and release rates was examined in this study. Oil soluble Sudan II dye solution in methyl laurate was used as a model hydrophobic fill, representing other latent fills with low partition coefficients, and their encapsulation efficiency as well as dye release rates were measured spectroscopically in a water medium. The influence of polyol content in the PU polymer matrix of microcapsules was investigated. An increase in polyol contents leads to an increase in the mean size of microcapsules but a decrease in the gel content (degree of cross-linking density) and permeability of their shell structure. The encapsulated PCMs for thermal energy storage demonstrated here exhibited promising performance for possible use in building or paving materials in terms of released heat, desired phase transformation temperature, chemical and physical stability, and concrete durability during placement.

  15. Crane Scheduling for a Plate Storage

    DEFF Research Database (Denmark)

    Hansen, Jesper; Clausen, Jens

    2002-01-01

    Odense Steel Shipyard produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until they are needed in production. This paper considers the problem of scheduling two cranes that carry out the movements of plates...... into, around and out of the storage. The system is required to create a daily schedule for the cranes, but also handle possible disruptions during the execution of the plan. The problem is solved with a Simulated Annealing algorithm....

  16. Finding Worst-Case Flexible Schedules using Coevolution

    DEFF Research Database (Denmark)

    Jensen, Mikkel Thomas

    2001-01-01

    Finding flexible schedules is important to industry, since in many environments changes such as machine breakdowns or the appearance of new jobs can happen at short notice.......Finding flexible schedules is important to industry, since in many environments changes such as machine breakdowns or the appearance of new jobs can happen at short notice....

  17. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  18. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  19. Changes in the incidence of pneumonia, bacterial meningitis, and infant mortality 5 years following introduction of the 13-valent pneumococcal conjugate vaccine in a "3+0" schedule.

    Science.gov (United States)

    Becker-Dreps, Sylvia; Blette, Bryan; Briceño, Rafaela; Alemán, Jorge; Hudgens, Michael G; Moreno, Gilberto; Ordoñez, Ana; Rocha, Julio; Weber, David J; Amaya, Erick

    2017-01-01

    Streptococcus pneumoniae causes about 826,000 deaths of children in the world each year and many health facility visits. To reduce the burden of pneumococcal disease, many nations have added pneumococcal conjugate vaccines to their national immunization schedules. Nicaragua was the first country eligible for GAVI Alliance funding to introduce the 13-valent pneumococcal conjugate vaccine (PCV13) in 2010, provided to infants at 2, 4, and 6 months of age. The goal of this study was to evaluate the population impact of the first five years of the program. Numbers of visits for pneumonia, pneumonia-related deaths, and bacterial meningitis in both children and adults, and infant deaths between 2008 and 2015 were collected from all 107 public health facilities in León Department. Vital statistics data provided additional counts of pneumonia-related deaths that occurred outside health facilities. Adjusted incidence rates and incidence rate ratios (IRRa) in the vaccine (2011-2015) and pre-vaccine periods (2008-2010) were estimated retrospectively using official population estimates as exposure time. The IRRa for pneumonia hospitalizations was 0.70 (95% confidence interval [CI]: 0.66, 0.75) for infants, and 0.92 (95% CI: 0.85, 0.99) for one year-olds. The IRRa for post-neonatal infant mortality was 0.56 (95% CI: 0.41, 0.77). In the population as a whole, ambulatory visits and hospitalizations for pneumonia, as well as pneumonia-related mortality and rates of bacterial meningitis were lower in the vaccine period. During the first five years of program implementation, reductions were observed in health facility visits for pneumonia in immunized age groups and infant mortality, which would be hard to achieve with any other single public health intervention. Future study is warranted to understand whether the lack of a booster dose (e.g., at 12 months) may be responsible for the small reductions in pneumonia hospitalizations observed in one year-olds as compared to infants.

  20. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  1. An introduction to optimal satellite range scheduling

    CERN Document Server

    Vázquez Álvarez, Antonio José

    2015-01-01

    The satellite range scheduling (SRS) problem, an important operations research problem in the aerospace industry consisting of allocating tasks among satellites and Earth-bound objects, is examined in this book. SRS principles and solutions are applicable to many areas, including: Satellite communications, where tasks are communication intervals between sets of satellites and ground stations Earth observation, where tasks are observations of spots on the Earth by satellites Sensor scheduling, where tasks are observations of satellites by sensors on the Earth. This self-contained monograph begins with a structured compendium of the problem and moves on to explain the optimal approach to the solution, which includes aspects from graph theory, set theory, game theory and belief networks. This book is accessible to students, professionals and researchers in a variety of fields, including: operations research, optimization, scheduling theory, dynamic programming and game theory. Taking account of the distributed, ...

  2. Research on changes of nitrate by interactions with metals under the wastes disposal environment containing TRU nuclide. 2

    International Nuclear Information System (INIS)

    Wada, Ryutaro; Nishimura, Tsutomu; Masuda, Kaoru; Fujiwara, Kazuo; Imakita, Tsuyoshi; Tateishi, Tsuyoshi

    2004-02-01

    In TRU wastes, wastes containing nitrate ion as salt exist. In the disposal site environment, this nitrate ion changes into nitrite ion, ammonia, etc., and possibly affects disposal site environmental changes or nuclide migration parameters. In the present research, evaluation was carried out on the chemical interaction between nitrate ion and carbon steel, which is primary reducing agent, under the low-oxygen conditions simulating a disposal site. (1) In the electrochemical test, test data were generated in order to supplement influence parameters required for improvement of the accuracy of the nitrate reaction model (NEON). As the results, it was found that the influence of potential and pH is remarkable, also that of initial nitrate concentration is significant, while the temperature is not remarkable to the nitrate and nitrite reaction themselves. Besides, it was found that the difference in the surface condition of the electrodes is not remarkable. (2) Several long-term reaction tests were carried out to assume the effects of important parameters on the nitrate behavior with carbon steel under low-oxygen high-alkaline type simulated groundwater conditions using glass sealed apparatus (ampoule tests). As the results, it was found that initial nitrate ion concentration and temperature causes the increase of hydrogen generation as well as ammonia generation, while it was found that the difference of carbon steel composition doesn't affect significantly. (3) The parameter fitting NEON was reexamined to improve accuracy, gathering data of electrochemical tests and ampoule tests conducted in 2003 and 2000 through 2002. In addition by comparing the calculation results with experimental results, applicability of NEON was investigated. (4) Implementation of NEON to the mass transfer calculation code was carried out in order to enable the calculation of the nitrate ion behavior including incomings and outgoings of substance to and from the system, resulting in the

  3. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  4. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  5. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  6. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  7. Shifts in hatch dates do not provide pied flycatchers with a rapid ontogenetic route to adjust offspring time schedules to climate change

    NARCIS (Netherlands)

    Ouwehand, Janne; Burger, Claudia; Both, Christiaan

    1. Environments change rapidly, and it is unclear whether organisms with complex life-styles, such as avian migrants, are able to adjust sufficiently. For understanding human impacts on ecosystem functioning, it is crucial to understand how well, and by which mechanisms species are able to adapt. 2.

  8. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  9. Are behaviors at one alternative in concurrent schedules independent of contingencies at the other alternative?

    Science.gov (United States)

    MacDonall, James S

    2017-09-01

    Some have reported changing the schedule at one alternative of a concurrent schedule changed responding at the other alternative (Catania, 1969), which seems odd because no contingencies were changed there. When concurrent schedules are programmed using two schedules, one associated with each alternative that operate continuously, changing the schedule at one alternative also changes the switch schedule at the other alternative. Thus, changes in responding at the constant alternative could be due to the change in the switch schedule. To assess this possibility, six rats were exposed to a series of conditions that alternated between pairs of interval schedules at both alternatives and a pair of interval schedules at one, constant, alternative and a pair of extinction schedules at the other alternative. Comparing run lengths, visit durations and response rates at the constant alternative in the alternating conditions did not show consistent increases and decreases when a strict criterion for changes was used. Using a less stringent definition (any change in mean values) showed changes. The stay/switch analysis suggests it may be inaccurate to apply behavioral contrast to procedures that change from concurrent variable-interval variable-interval schedules to concurrent variable-interval extinction schedules because the contingencies in neither alternative are constant. © 2017 Society for the Experimental Analysis of Behavior.

  10. Schedules of requirements for the transport of specified types of radioactive material consignments

    International Nuclear Information System (INIS)

    1986-01-01

    These Schedules have been prepared as a companion document to the 1985 Edition of the Transport Regulations (Safety Series No. 6). As presented here, the Schedules also reflect the corrections and changes implemented by the 1986 Supplement to the Regulations for the Safe Transport of Radioactive Material. Direct cross-referencing to the paragraphs, tables and figures in the Regulations is made, and the use of both the International System of Units (SI) and the formerly accepted, traditional units is continued. In many cases, due to rounding off the numbers, the two values for a given parameter for the two units may differ somewhat. To move toward international use of SI units and to avoid inconsistencies, the values for the SI units are controlling in all cases. These Schedules are provided only as an aid to users of the Regulations and the provisions of the Regulations take precedence over the Schedules. These Schedules also serve as a generic model of the Schedules which are part of modal international regulatory documents, such as the International Maritime Dangerous Goods (IMDG) Code of the International Maritime Organization (IMO), the European Agreement Concerning the International Carriage of Dangerous Goods by Road (ADR) and the International Convention Concerning the Carriage of Dangerous Goods by Rail (CIM/RID). For regulatory purposes, reference shall be made to the detailed provisions of the Regulations specified in Safety Series No. 6. The Schedules do not reproduce the provisions of the Regulations in detail nor do they contain any additional requirements. They merely provide a summary of the main provisions for each specified type of radioactive material, references being provided to the relevant detailed provisions of the Regulations to enable these to be consulted where necessary. A table summarizing package, shipment approval, and notification requirements of the Regulations is provided

  11. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  12. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  13. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  14. Data analysis with the DIANA meta-scheduling approach

    International Nuclear Information System (INIS)

    Anjum, A; McClatchey, R; Willers, I

    2008-01-01

    The concepts, design and evaluation of the Data Intensive and Network Aware (DIANA) meta-scheduling approach for solving the challenges of data analysis being faced by CERN experiments are discussed in this paper. Our results suggest that data analysis can be made robust by employing fault tolerant and decentralized meta-scheduling algorithms supported in our DIANA meta-scheduler. The DIANA meta-scheduler supports data intensive bulk scheduling, is network aware and follows a policy centric meta-scheduling. In this paper, we demonstrate that a decentralized and dynamic meta-scheduling approach is an effective strategy to cope with increasing numbers of users, jobs and datasets. We present 'quality of service' related statistics for physics analysis through the application of a policy centric fair-share scheduling model. The DIANA meta-schedulers create a peer-to-peer hierarchy of schedulers to accomplish resource management that changes with evolving loads and is dynamic and adapts to the volatile nature of the resources

  15. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  16. Spike: Artificial intelligence scheduling for Hubble space telescope

    Science.gov (United States)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  17. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  18. A Gas Scheduling Optimization Model for Steel Enterprises

    Directory of Open Access Journals (Sweden)

    Niu Honghai

    2017-01-01

    Full Text Available Regarding the scheduling problems of steel enterprises, this research designs the gas scheduling optimization model according to the rules and priorities. Considering different features and the process changes of the gas unit in the process of actual production, the calculation model of process state and gas consumption soft measurement together with the rules of scheduling optimization is proposed to provide the dispatchers with real-time gas using status of each process, then help them to timely schedule and reduce the gas volume fluctuations. In the meantime, operation forewarning and alarm functions are provided to avoid the abnormal situation in the scheduling, which has brought about very good application effect in the actual scheduling and ensures the safety of the gas pipe network system and the production stability.

  19. ESSOPE: Towards S/C operations with reactive schedule planning

    Science.gov (United States)

    Wheadon, J.

    1993-01-01

    The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.

  20. 5 CFR 532.207 - Time schedule for wage surveys.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Time schedule for wage surveys. 532.207... PREVAILING RATE SYSTEMS Prevailing Rate Determinations § 532.207 Time schedule for wage surveys. (a) Wage... and the collection of wage data by visits to establishments. (c) A wage-change survey shall be made...

  1. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  2. The CANDU 3 containment structure

    International Nuclear Information System (INIS)

    1994-01-01

    The design of the CANDU 3 nuclear power plant is being developed by AECL CANDU's Saskatchewan office. There are 24 CANDU nuclear power units operating in Canada and abroad and eight units are under construction is Romania and South Korea. The design of the CANDU 3 plant has evolved on the basis of the proven CANDU design. The experiences gained during construction, commissioning and operation of the existing CANDU plants are considered in the design. Many technological enhancements have been implemented in the design processes in all areas. The object has been to develop an improved reactor design that is suitable for the current and the future markets worldwide. Throughout the design phase of CANDU 3, emphasis has been placed in reducing the cost and construction schedule of the plant. This has been achieved by implementing design improvements and using new construction techniques. Appropriate changes and improvements to the design to suit new requirements are also adopted. In CANDU plants, the containment structure acts as an ultimate barrier against the leakage of radioactive substances during normal operations and postulated accident conditions. The concept of the structural design of the containment structure has been examined in considerable detail. This has resulted in development of a new conceptual design for the containment structure for CANDU 3. This paper deals with this new design of the containment structure

  3. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    . The rostering process is non-trivial and especially when service is required around the clock, rostering may involve considerable effort from a designated planner. Therefore, in order to minimize costs and overstaffing, to maximize the utilization of available staff, and to ensure a high level of satisfaction...... as possible to the available staff, while respecting various requirements and rules and while including possible transportation time between tasks. This thesis presents a number of industrial applications in rostering and task scheduling. The applications exist within various contexts in health care....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied...

  4. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  5. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  6. Material use and production changes in the U.S. wood pallet and container industry: 1992 to 2006

    Science.gov (United States)

    R. J. Bush; P. A. Araman

    2009-01-01

    A series of five studies conducted by the Virginia Tech Department of Wood Science and Forest Products, in collaboration with the USDA - Forest Service (Blacksburg, Virginia), have tracked activity in the U.S. wood pallet and container industry between 1992 and 2006. The studies documented trends in wood use and pallet production with in the industry, both new...

  7. Changes in the substance P-containing innervation of the lumbosacral spinal cord in male Wistar rats as a consequence of ageing.

    Science.gov (United States)

    Ranson, Richard N; Priestley, David J; Santer, Robert M; Watson, Alan H D

    2005-03-02

    Quantitative image analysis was used to determine age-related changes in the substance P-containing innervation of autonomic and somatic nuclei in the lumbosacral spinal cord, which are associated with the control of micturition and sexual reflexes. In the upper lumbar segments (L1-L2), significant declines in the distribution density of substance P-containing processes were observed in the dorsal grey commissure, the intermediolateral cell column and the ventral horn. More caudally, at levels corresponding to L5 through S1, significant reductions were seen in the dorsal grey commissure and within the sacral parasympathetic nucleus. In contrast to these observations, the substance P-immunoreactive innervation of the dorsolateral nucleus remained robust in aged animals and was not significantly different from young adults. It is possible that these distinct age-related patterns of change in substance P-containing innervation, are reflected in the urinary/sexual dysfunction's in aged animals.

  8. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  9. Sensor Transmission Power Schedule for Smart Grids

    Science.gov (United States)

    Gao, C.; Huang, Y. H.; Li, J.; Liu, X. D.

    2017-11-01

    Smart grid has attracted much attention by the requirement of new generation renewable energy. Nowadays, the real-time state estimation, with the help of phasor measurement unit, plays an important role to keep smart grid stable and efficient. However, the limitation of the communication channel is not considered by related work. Considering the familiar limited on-board batteries wireless sensor in smart grid, transmission power schedule is designed in this paper, which minimizes energy consumption with proper EKF filtering performance requirement constrain. Based on the event-triggered estimation theory, the filtering algorithm is also provided to utilize the information contained in the power schedule. Finally, its feasibility and performance is demonstrated using the standard IEEE 39-bus system with phasor measurement units (PMUs).

  10. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  11. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  12. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  13. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  14. Heat transfer characteristics of UF6 in a container heated from outer surface. Pt. 1. Thermal hydraulic analysis method taking account of phase change and volume expansion

    International Nuclear Information System (INIS)

    Wataru, Masumi; Gomi, Yoshio; Yamakawa, Hidetsugu; Tsumune, Daisuke

    1995-01-01

    Natural UF6 is transported in a steel container from foreign countries to the enrichment plant in Japan. If the container meets fire accident, it is heated by fire (800degC) and rupture of the container may occur. For the safety point of view, it is necessary to know whether rupture occurs or not. Because UF6 has a radiological and chemical hazards, it is difficult to perform a demonstration test with UF6. So thermal calculation method has to be developed. The rupture is caused by UF6 gaseous pressure or volume expansion of liquid UF6. To know time history of internal pressure and temperature distribution in the container, it is important to evaluate thermal phenomena of UF6. When UF6 is heated, it changes from solid to liquid or gas at low temperature (64degC) and then its volume expands little by little. In this study, thermal calculation method has been developed taking phase change and thermal expansion of UF6 into account. In the calculation, a two-dimensional model is adopted and natural convection of liquid UF6 is analyzed. As a result of this study, numerical solutions have been obtained taking phase change and volume expansion into account. (author)

  15. Group 4. Containment

    International Nuclear Information System (INIS)

    McCauley, V.S.; Keiser, J.R.

    1992-01-01

    This paper summarizes the findings of the Containment Working Group which met at the Workshop on Radioactive, Hazardous, and/or Mixed Waste Sludge Management. The Containment Working Group (CWG) examined the problems associated with providing adequate containment of waste forms from both short- and long-term storage. By its nature, containment encompasses a wide variety of waste forms, storage conditions, container types, containment schemes, and handling activities. A containment system can be anything from a 55-gal drum to a 100-ft-long underground vault. Because of the diverse nature of containment systems, the CWG chose to focus its limited time on broad issues that are applicable to the design of any containment system, rather than attempting to address problems specific to a particular containment system or waste-form type. Four major issues were identified by the CWG. They relate to: (1) service conditions and required system performance; (2) ultimate disposition; (3) cost and schedule; and (4) acceptance criteria, including quality assurance/quality control (QA/QC) concerns. All of the issues raised by the group are similar in that they all help to define containment system requirements

  16. Flexible work schedules, older workers, and retirement.

    Science.gov (United States)

    Siegenthaler, J K; Brenner, A M

    2000-01-01

    Older workers in the United States indicate that they would prefer flexible work arrangements rather than abrupt retirement, yet management has done very little to make this possible. A review of two bodies of literature from the late 1980s is presented: social science writings including sociological, gerontological, and economic literature, and business and management literature. There is a clash between the way jobs are traditionally scheduled and the needs of growing numbers of older workers. Workers continue to be subject to obstacles to phased retirement due to the structuring of health care and pension benefits, downsizing, organizational inflexibility, and "corporate culture." Thus, general views among social scientists regarding the desirability of flexible schedules toward retirement will not produce real changes unless management becomes committed to such changes and they are securely embedded in company policies.

  17. Changes in the decontamination factor of cesium iodide on evaporation of a scrubbing solution in the Filtered Containment Venting System

    Energy Technology Data Exchange (ETDEWEB)

    Na, Young Su; Ha, Kwang Soon; Kim, Sungil; Cho, Song-Won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    When the pressure in the containment building approaches a setting value, the FCVS(Filtered Containment Venting System) operates. The amount of steam and gas mixtures generated during a severe accident can be released into the FCVS. Non-condensable gases and fine aerosols can pass a scrubbing solution and the filters in the FCVS vessel. The decontaminated gases are finally discharged from the FCVS to the outside environment. Previous study observed that a scrubbing solution in the FCVS vessel was constantly evaporating owing to high-temperature steam released continuously from the containment building. A scrubbing solution in the FCVS vessel was completely evaporated at about 31 hours after the FCVS operation. Pool evaporation in the FCVS vessel can negatively affect the decontamination feature of the FCVS because it reduces the scrubbing depth for fission products in an aerosol form. This study carefully evaluated the decontamination factor of metal iodide aerosols especially cesium iodide (CsI), on a scrubbing solution in the FCVS. This paper summarizes the calculated results on the decontamination factor of CsI in the FCVS vessel, which was presented at the international OECD-NEA/NUGENIA-SARNET workshop. This study estimated the decontamination factor of CsI on a scrubbing solution in the FCVS. The MELCOR computer code simulated that an SBO occurred in the OPR 1000. The FCVS consists of a cylindrical vessel with a 3 m diameter and 6.5 m height, and it includes a scrubbing solution of 21 tons. Accumulated mass of CsI aerosol was calculated in a scrubbing solution and the atmosphere in the FCVS vessel and the outside environment. In the early FCVS operation, the decontamination factor of CsI aerosol rapidly increased owing to steam condensation in a scrubbing solution. When the temperature of a pool approached its saturation temperature, the decontamination factor of CsI aerosol started to decrease.

  18. A reference device for evaluating the thermal behavior of installed multilayered wall containing a phase change material

    International Nuclear Information System (INIS)

    Pagliolico, S.L.; Sassi, G.; Cascone, Y.; Bongiovanni, R.M.

    2015-01-01

    Highlights: • Thermal analysis of installed wallboards embedding phase change material layer. • Simple devices and real conditions for thermal analysis toward a standardization. • Scanning calorimetric measurements as initial condition for data regression. • Bias correction of calorimetric measurements data by installation factors. • Practical approach to identify a reliable thermal curve for capacitive wallboards. - Abstract: Thermal inertia of lightweight building envelopes can be improved including phase change materials in multilayered wallboards. The thermal modeling of buildings for design purposes needs a robust description of the thermal properties of installed phase change materials. A standard method would improve the thermal characterization of commercial products. The aim of the study is to develop a simple methodology to obtain reliable thermal data for phase change materials integrated in multilayered wallboards. The methodology modifies differential scanning calorimetry measurements on phase change material by installation factors to obtain the apparent specific heat vs. temperature for the wallboard layer embedding phase change material. Simple cubic cells were realized as reference devices to simulate a confined environment. A dynamic model of heat transfer was developed to simulate the thermal behavior of devices. Installation factors were calculated by regression of the monitored temperatures inside and outside the devices operating under real environmental conditions. The apparent specific heat of phase change material, measured by differential scanning calorimetry at different rates, resulted in a spread of curves vs. temperature. Mean curves were used as initial condition for regression. The mean calculation method did not significantly affect the installed resulted curve. A unique curve of apparent specific heat vs. temperature best fit data measured over a wide range of experimental devices and conditions. Good regression

  19. Injury of young cucumber plants caused by dust containing fluorine emitted by industrial concerns; changes in the green leaf pigments

    Energy Technology Data Exchange (ETDEWEB)

    Haspelova-Horvatovicova, A

    1964-01-01

    Particulates containing fluorine obtained at an aluminum production facility were applied at a rate of 1 gram per square meter to the cotyledons of cucumber plants, and caused (sequentially) acute and chronic injury. Reduced chlorophyll content was correlated with the acute phase, and retardation of normal chlorophyll degradation was correlated with the chronic phase. The true leaves, which did not come into direct contact with the particulates, displayed chronic injury symptoms, the most noticeable of which was reduced growth. Pigment content of experimental plants was lower than controls. Overhead watering caused more severe symptom development of symptoms than did watering the soil. 6 references, 1 figure, 1 table.

  20. Radiation induced change in the affinity of a plastic resin to chlorine contained in artificial tap water

    International Nuclear Information System (INIS)

    Fujiyoshi, Ryoko; Sawamura, Sadashi; Katayama, Meiseki

    1985-01-01

    γ-Radiation curing of a polyacetal resin was attempted in order to eliminate the unsuitable property for the joints of tap water pipes. In the case of non-irradiated resin, almost all available chlorine (AC) contained in usual tap water disappeared. γ-Irradiation of the resin showed an indirect effect on eliminating such a property; that is, a decrease in the amount of AC from artificial tap water (test solution) showed a decrease to JIS (Japan Industrial Standards) level of requirement at certain absorption doses. However, it was also found that the decrease in the amount of AC from the test solution increased with time after γ-irradiation. (author)

  1. Sinks of containment of NPP. Trillo I. Civil actions associated with the changing filter system and implementation backwash

    International Nuclear Information System (INIS)

    Blas Gordo, A. de; Asensio Vega, J.; Font Hadinger, I.

    2014-01-01

    Compliance with a technical instruction issued by the Security Council Nuclear the 12/09/11, involves the modification of the system of filtering of containment sumps of the C.N. Trillo I, in order to rule out surround way phenomena of potential obstruction by accumulation of residues that may affect the cooling capacity of the core in a post accident scenario. Similarly, it implies the creation of a procedure operating in emergency that includes the necessary maneuvers for the limitation of the pressure differential between the two sides of the filter grids, guaranteeing the function of recirculation post-LOCA. (Author)

  2. Manufacturing Scheduling Using Colored Petri Nets and Reinforcement Learning

    Directory of Open Access Journals (Sweden)

    Maria Drakaki

    2017-02-01

    Full Text Available Agent-based intelligent manufacturing control systems are capable to efficiently respond and adapt to environmental changes. Manufacturing system adaptation and evolution can be addressed with learning mechanisms that increase the intelligence of agents. In this paper a manufacturing scheduling method is presented based on Timed Colored Petri Nets (CTPNs and reinforcement learning (RL. CTPNs model the manufacturing system and implement the scheduling. In the search for an optimal solution a scheduling agent uses RL and in particular the Q-learning algorithm. A warehouse order-picking scheduling is presented as a case study to illustrate the method. The proposed scheduling method is compared to existing methods. Simulation and state space results are used to evaluate performance and identify system properties.

  3. Complex traffic flow that allows as well as hampers lane-changing intrinsically contains social-dilemma structures

    Science.gov (United States)

    Iwamura, Yoshiro; Tanimoto, Jun

    2018-02-01

    To investigate an interesting question as to whether or not social dilemma structures can be found in a realistic traffic flow reproduced by a model, we built a new microscopic model in which an intentional driver may try lane-changing to go in front of other vehicles and may hamper others’ lane-changes. Our model consists of twofold parts; cellular automaton emulating a real traffic flow and evolutionary game theory to implement a driver’s decision making-process. Numerical results reveal that a social dilemma like the multi-player chicken game or prisoner’s dilemma game emerges depending on the traffic phase. This finding implies that a social dilemma, which has been investigated by applied mathematics so far, hides behind a traffic flow, which has been explored by fluid dynamics. Highlight - Complex system of traffic flow with consideration of driver’s decision making process is concerned. - A new model dovetailing cellular automaton with game theory is established. - Statistical result from numerical simulations reveals a social dilemma structure underlying traffic flow. - The social dilemma is triggered by a driver’s egocentric actions of lane-changing and hampering other’s lane-change.

  4. The application of artificial intelligence to astronomical scheduling problems

    Science.gov (United States)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  5. 42 CFR 414.620 - Publication of the ambulance fee schedule.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Publication of the ambulance fee schedule. 414.620... SERVICES (CONTINUED) MEDICARE PROGRAM PAYMENT FOR PART B MEDICAL AND OTHER HEALTH SERVICES Fee Schedule for Ambulance Services § 414.620 Publication of the ambulance fee schedule. Changes in payment rates resulting...

  6. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  7. Structural changes in a clay-containing nanocomposite with a different moisture content caused by its deformation

    International Nuclear Information System (INIS)

    Fajtel'son, E.A.; Glaskova, T.I.; Korkhovm, V.P.; Aniskevich, A.N.

    2010-01-01

    This paper presents the results of an investigation of the properties of a clay-containing nanocomposite with an epoxy binder under moisture-temperature and mechanical action. It has been established that whatever the moisture content, the nanocomposite crystallizes under the thermomechanical action (upon reaching the glasstransition temperature). When the nanocomposite is heated to 70 C, the restructuring process is reversible, and its heating to above 150 C leads to its amorphization. The presence of clay nanoparticles (up to 6 mass percent) does not influence the temperature of structural transitions of the nanocomposite and does not cause a substantial strengthening effect. The sorbed moisture plasticizes the nanocomposite and decreases its glasstransition temperature by 10 C. The specific features of the thermomechanical behavior of nanocomposites upon their tensile prestrain or creep are due to the formation of an oriented structure. Their crystallization begins at lower temperatures and with a higher degree of crystallinity than that of unloaded nanostructures. (authors)

  8. Reactor container

    International Nuclear Information System (INIS)

    Shibata, Satoru; Kawashima, Hiroaki

    1984-01-01

    Purpose: To optimize the temperature distribution of the reactor container so as to moderate the thermal stress distribution on the reactor wall of LMFBR type reactor. Constitution: A good heat conductor (made of Al or Cu) is appended on the outer side of the reactor container wall from below the liquid level to the lower face of a deck plate. Further, heat insulators are disposed to the outside of the good heat conductor. Furthermore, a gas-cooling duct is circumferentially disposed at the contact portion between the good heat conductor and the deck plate around the reactor container. This enables to flow the cold heat from the liquid metal rapidly through the good heat conductor to the cooling duct and allows to maintain the temperature distribution on the reactor wall substantially linear even with the abrupt temperature change in the liquid metal. Further, by appending the good heat conductor covered with inactive metals not only on the outer side but also on the inside of the reactor wall to introduce the heat near the liquid level to the upper portion and escape the same to the cooling layer below the roof slab, the effect can be improved further. (Ikeda, J.)

  9. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  10. Production planning and scheduling in refinery industry

    International Nuclear Information System (INIS)

    Persson, Jan.

    1999-01-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  11. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-07-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis.

  12. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-06-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  13. A decentralized scheduling algorithm for time synchronized channel hopping

    Directory of Open Access Journals (Sweden)

    Andrew Tinka

    2011-09-01

    Full Text Available Time Synchronized Channel Hopping (TSCH is an existing Medium Access Control scheme which enables robust communication through channel hopping and high data rates through synchronization. It is based on a time-slotted architecture, and its correct functioning depends on a schedule which is typically computed by a central node. This paper presents, to our knowledge, the first scheduling algorithm for TSCH networks which both is distributed and which copes with mobile nodes. Two variations on scheduling algorithms are presented. Aloha-based scheduling allocates one channel for broadcasting advertisements for new neighbors. Reservation- based scheduling augments Aloha-based scheduling with a dedicated timeslot for targeted advertisements based on gossip information. A mobile ad hoc motorized sensor network with frequent connectivity changes is studied, and the performance of the two proposed algorithms is assessed. This performance analysis uses both simulation results and the results of a field deployment of floating wireless sensors in an estuarial canal environment. Reservation-based scheduling performs significantly better than Aloha-based scheduling, suggesting that the improved network reactivity is worth the increased algorithmic complexity and resource consumption.

  14. Dynamics of cocaine- and amphetamine-regulated transcript containing cell changes in the adrenal glands of two kidney, one clip rats.

    Science.gov (United States)

    Kasacka, Irena; Piotrowska, Zaneta; Janiuk, Izabela; Zbucki, Robert

    2014-10-01

    Taking into consideration the homeostatic disorders resulting from renal hypertension and the essential role of cocaine- and amphetamine-regulated transcript (CART) in maintaining homeostasis by regulating many functions of the body, the question arises as to what extent the renovascular hypertension affects the morphology and dynamics of changes of CART-containing cells in the adrenal glands. The aim of the present study was to examine the distribution, morphology, and dynamics of changes of CART-containing cells in the adrenal glands of "two kidney, one clip" (2K1C) renovascular hypertension model in rats. The studies were carried out on the adrenal glands of rats after 3, 14, 28, 42, and 91 days from the renal artery clipping procedure. To identify neuroendocrine cells, immunohistochemical reaction was performed with the use of a specific antibody against CART. It was revealed that renovascular hypertension causes changes in the endocrine cells containing CART in the adrenal glands of rats. The changes observed in the endocrine cells depend on the time when the rats with experimentally induced hypertension were examined. In the first period of hypertension, the number and immunoreactivity of CART-containing cells were decreased, while from the 28-day test, it significantly increased, as compared to the control rats. CART is relevant to the regulation of homeostasis in the cardiovascular system and seems to be involved in renovascular hypertension. The results of the present work open the possibility of new therapeutic perspectives for the treatment of arterial hypertension, since CART function is involved in their pathophysiology. © 2014 by the Society for Experimental Biology and Medicine.

  15. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  16. Hanford site environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 open-quotes General Environmental Protection Program,close quotes and DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment.close quotes The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations

  17. Preparation of Melamine - Formaldehyde Microcapsules Containing Hexadecane as a Phase Change Material: The Effect of Surfactants Type and Concentration

    Directory of Open Access Journals (Sweden)

    Zeinab Alinejad

    2013-05-01

    Full Text Available Microcapsules containing n-hexadecane (HD as the core and melamineformaldehyde (MF prepolymer as the shell were prepared by in-situ dispersion polymerization. The effects of surfactants type and amount were studied in relation to the morphology and thermal properties of microcapsules. The morphology of the microcapsules was studied using scanning electron microscopy (SEM and thermal properties were detected by differential scanning calorimetry (DSC and thermogravimetric analysis (TGA. SEM images showed that the increase in the amount of Triton X-100 (non-ionic to SDS (ionic ratio resulted in the agglomeration of the prepared microcapsules. This increase led also to lower encapsulated hexadecane and thermal stability of microcapsules. As a result, the optimum composition of the above surfactants for obtaining higher thermal stability and proper morphology wasfound to be 20 wt% of Triton X-100 and 80 wt% of SDS in the recipe. The optimum total amounts of surfactants was 4 wt%, which resulted in spherical and separate microcapsules. DSC and TGA analyses revealed that a sample prepared with 4 wt% of surfactants was not only successful in encapsulation of hexadecane but also showedhigher thermal stability compared with other formulations.

  18. Characterizations and thermal stability improvement of phase-change memory device containing Ce-doped GeSbTe films

    Energy Technology Data Exchange (ETDEWEB)

    Huang, Yu-Jen; Tsai, Min-Chuan; Wang, Chiung-Hsin; Hsieh, Tsung-Eong, E-mail: tehsieh@mail.nctu.edu.tw

    2012-02-29

    Phase-transition temperature of GeSbTe (GST) chalcogenide film was drastically increased from 159 to 236 Degree-Sign C by cerium (Ce) doping (up to 8.6 at.%) without altering the resistivity property of GST. Grain refinement via the solid-solution mechanism and the amplification of p-type semiconducting behavior in Ce-doped GST were observed. They were correlated with the enhancement of thermal stability and data retention property of GST as revealed by exothermal and isothermal analyses. Phase-change memory (PCM) device characterized at various temperatures revealed an effective thermal stability improvement on the threshold voltage of PCM device by Ce doping. - Highlights: Black-Right-Pointing-Pointer Ce doping increased phase-change temperature of GST from 159 to 236 Degree-Sign C. Black-Right-Pointing-Pointer No suppression of resistivity level in amorphous Ce-doped GST. Black-Right-Pointing-Pointer Resistance ratio of amorphous and crystalline Ce-doped GST was preserved at 10{sup 5}. Black-Right-Pointing-Pointer p-type semiconducting behavior of GST was enhanced by Ce-doping. Black-Right-Pointing-Pointer Ce-doping improved the thermal stability of threshold voltage of GST PCM device.

  19. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  20. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  1. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  2. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  3. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  4. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  5. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  6. Medications for Sleep Schedule Adjustments in Athletes.

    Science.gov (United States)

    Baird, Matthew B; Asif, Irfan M

    Sleep schedule adjustments are common requirements of modern-day athletes. Many nonpharmacologic and pharmacologic strategies exist to facilitate circadian rhythm shifts to maximize alertness and performance during competition. This review summarizes the evidence for commonly used pharmacologic agents and presents recommendations for the sports medicine provider. MEDLINE searches were performed using the following keywords: sleep aids, circadian rhythm adjustment, athletes and sleep, caffeine and sports, melatonin and athletes, and sleep aids and sports. Pertinent articles were extracted and discussed. Clinical review. Level 2. There are very few available studies investigating pharmacologic sleep aids in athletes. Data from studies involving shift workers and airline personnel are more abundant and were used to formulate recommendations and conclusions. Melatonin, caffeine, and nonbenzodiazepine sleep aids have a role in facilitating sleep schedule changes in athletes and maximizing sports performance through sleep enhancement.

  7. Load scheduling for decentralized CHP plants

    DEFF Research Database (Denmark)

    Nielsen, Henrik Aalborg, orlov 31.07.2008; Madsen, Henrik; Nielsen, Torben Skov

    ) an interactive decision support tool by which optimal schedules can be found given the forecasts or user-defined modifications of the forecasts, and (iii) an automatic on-line system for monitoring when conditions have changed so that rescheduling is appropriate. In this report the focus is on methods applicable...... be obtained. Furthermore, we believe that all relevant forecasting methods are far too complicated to allow for this integration; both uncertainties originating from the dependence of heat load on climate and from meteorological forecasts need to be taken into account. Instead we suggest that the decision....... By letting the system find optimal schedules for each of these realizations the operator can gain some insight into the importance of the uncertainties. It is shown that with modern personal computers (e.g. 1 GHz Pentium III), operating systems (e.g. RedHat Linux 6.0), and compilers (e.g. GNU C 2...

  8. Numerical Heat Transfer Studies of a Latent Heat Storage System Containing Nano-Enhanced Phase Change Material

    Directory of Open Access Journals (Sweden)

    S F Hosseinizadeh

    2011-01-01

    Full Text Available The heat transfer enhancement in the latent heat thermal energy storage system through dispersion of nanoparticle is reported. The resulting nanoparticle-enhanced phase change materials (NEPCM exhibit enhanced thermal conductivity in comparison to the base material. The effects of nanoparticle volume fraction and some other parameters such as natural convection are studied in terms of solid fraction and the shape of the solid-liquid phase front. It has been found that higher nanoparticle volume fraction result in a larger solid fraction. The present results illustrate that the suspended nanoparticles substantially increase the heat transfer rate and also the nanofluid heat transfer rate increases with an increase in the nanoparticles volume fraction. The increase of the heat release rate of the NEPCM shows its great potential for diverse thermal energy storage application.

  9. Structural basis and kinetics of force-induced conformational changes of an αA domain-containing integrin.

    Directory of Open Access Journals (Sweden)

    Xue Xiang

    Full Text Available Integrin α(Lβ₂ (lymphocyte function-associated antigen, LFA-1 bears force upon binding to its ligand intercellular adhesion molecule 1 (ICAM-1 when a leukocyte adheres to vascular endothelium or an antigen presenting cell (APC during immune responses. The ligand binding propensity of LFA-1 is related to its conformations, which can be regulated by force. Three conformations of the LFA-1 αA domain, determined by the position of its α₇-helix, have been suggested to correspond to three different affinity states for ligand binding.The kinetics of the force-driven transitions between these conformations has not been defined and dynamically coupled to the force-dependent dissociation from ligand. Here we show, by steered molecular dynamics (SMD simulations, that the αA domain was successively transitioned through three distinct conformations upon pulling the C-terminus of its α₇-helix. Based on these sequential transitions, we have constructed a mathematical model to describe the coupling between the αA domain conformational changes of LFA-1 and its dissociation from ICAM-1 under force. Using this model to analyze the published data on the force-induced dissociation of single LFA-1/ICAM-1 bonds, we estimated the force-dependent kinetic rates of interstate transition from the short-lived to intermediate-lived and from intermediate-lived to long-lived states. Interestingly, force increased these transition rates; hence activation of LFA-1 was accelerated by pulling it via an engaged ICAM-1.Our study defines the structural basis for mechanical regulation of the kinetics of LFA-1 αA domain conformational changes and relates these simulation results to experimental data of force-induced dissociation of single LFA-1/ICAM-1 bonds by a new mathematical model, thus provided detailed structural and kinetic characterizations for force-stabilization of LFA-1/ICAM-1 interaction.

  10. Role of the heat capacity change in understanding and modeling melting thermodynamics of complementary duplexes containing standard and nucleobase-modified LNA.

    Science.gov (United States)

    Hughesman, Curtis B; Turner, Robin F B; Haynes, Charles A

    2011-06-14

    Melting thermodynamic data obtained by differential scanning calorimetry (DSC) are reported for 43 duplexed oligonucleotides containing one or more locked nucleic acid (LNA) substitutions. The measured heat capacity change (ΔC(p)) for the helix-to-coil transition is used to compute the changes in enthalpy and entropy for melting of an LNA-bearing duplex at the T(m) of its corresponding isosequential unmodified DNA duplex to allow rigorous thermodynamic analysis of the stability enhancements provided by LNA substitutions. Contrary to previous studies, our analysis shows that the origin of the improved stability is almost exclusively a net reduction (ΔΔS° thermodynamics and the increased melting temperature (ΔT(m)) of heteroduplexes formed between an unmodified DNA strand and a complementary strand containing any number and configuration of standard LNA nucleotides A, T, C, and G. This single-base thermodynamic (SBT) model requires only four entropy-related parameters in addition to ΔC(p). Finally, DSC data for 20 duplexes containing the nucleobase-modified LNAs 2-aminoadenine (D) and 2-thiothymine (H) are reported and used to determine SBT model parameters for D and H. The data and model suggest that along with the greater stability enhancement provided by D and H bases relative to their corresponding A and T analogues, the unique pseudocomplementary properties of D-H base pairs may make their use appealing for in vitro and in vivo applications.

  11. Freezing the Master Production Schedule Under Rolling Planning Horizons

    OpenAIRE

    V. Sridharan; William L. Berry; V. Udayabhanu

    1987-01-01

    The stability of the Master Production Schedule (MPS) is a critical issue in managing production operations with a Material Requirements Planning System. One method of achieving stability is to freeze some portion or all of the MPS. While freezing the MPS can limit the number of schedule changes, it can also produce an increase in production and inventory costs. This paper examines three decision variables in freezing the MPS: the freezing method, the freeze interval length, and the planning ...

  12. Effects of a healthy food supply intervention in a military setting: positive changes in cereal, fat and sugar containing foods

    Directory of Open Access Journals (Sweden)

    Bingham Clarissa ML

    2012-07-01

    Full Text Available Abstract Background In Finland, all men are liable to military service and a clear majority completes service. The increasing prevalence of obesity also among soldiers concerns conscripts’ food choices. Conscripts are served nutritionally planned regular main meals but individual choices take place in free-time eating. This study assesses the effects in conscripts’ eating habits in an intervention targeting the supply of healthy foods available in the military setting. Methods Participants were 604 18-21-year old male conscripts of whom 242 belonged to Control Group and 362 to Intervention Group. Participants of Control Group were historical controls performing military service one year before Intervention Group. The intervention targeted selection, placement, and attractiveness of healthy foods in garrison refectories and soldier’s home cafeterias, the two main food providers in the military. Dietary intake data was collected by self-administered questionnaire at three time points: before/beginning of military service (T0, 8 weeks (T1 and 6 months (T2 of military service. Outcome measures were food consumption frequencies and four dietary indexes (Cereal Index, Fruit and Vegetable Index, Fat Index and Sugar Index developed to characterize the diet. Changes between study groups in outcome variables and in time were analysed by repeated-measures analysis of covariance. Results Significant (p  Conclusions In the military setting, healthier food choices can be promoted by intervening on the main food environments by improving the supply of healthy foods. However, impacting on conscripts’ individual selection as fruit and vegetable consumption is more challenging.

  13. Self-compacting concrete containing different powders at elevated temperatures - Mechanical properties and changes in the phase composition of the paste

    International Nuclear Information System (INIS)

    Bakhtiyari, S.; Allahverdi, A.; Rais-Ghasemi, M.; Zarrabi, B.A.; Parhizkar, T.

    2011-01-01

    Fire resistance of self-compacting concretes (SCC) containing limestone and quartz powders, with two different compressive strengths, were evaluated and compared with normal concretes (NC). The residual mechanical strengths of the mixes at different temperatures were measured. The changes in the phase composition of the cement pastes at high temperatures were examined with thermal analysis and X-ray diffractometry methods. The SCC mixes showed a higher susceptibility to spalling at high temperatures but the NC mixes suffered much more from loss of the mechanical strengths. Both the powder types and the compressive strength notably influenced the fire behavior of the SCC. The quartz powder accelerated the hydration of the SCC cement paste at high temperatures, up to 500 o C. However, the quartz-contained SCC showed the highest risk of spalling among all the mixes. The results showed that the thermal analysis could be a useful device for evaluating the fire behavior of building materials.

  14. Wear resistance and structural changes in nitrogen-containing high-chromium martensitic steels under conditions of abrasive wear and sliding friction

    International Nuclear Information System (INIS)

    Makarov, A.V.; Korshunov, L.G.; Schastlivtsev, V.M.; Chernenko, N.L.

    1998-01-01

    Martensitic nitrogen-containing steels Kh17N2A0.14, Kh13A0.14, Kh14G4A0.22 as well as steel 20Kh13 were studied for their wear resistance under conditions of friction and abrasion. Metallography, X ray diffraction analysis and electron microscopy were used to investigate the structural changes taking place in a thin surface layer on wearing. It is shown that an increase of nitrogen content of 0.14 to 0.22% promotes an enhancement of steel resistance to abrasive and adhesive wear, especially after tempering in the range of 500-550 deg C. Typically, the nitrogen-containing steels exhibit lower resistance to various types of wear in comparison with the steels with high-carbon martensite due to their lower deformability under conditions of friction loading

  15. Self-compacting concrete containing different powders at elevated temperatures - Mechanical properties and changes in the phase composition of the paste

    Energy Technology Data Exchange (ETDEWEB)

    Bakhtiyari, S., E-mail: bakhtiyari@bhrc.ac.ir [School of Chemical Engineering, Iran University of Science and Technology, Tehran (Iran, Islamic Republic of); Allahverdi, A., E-mail: ali.allahverdi@iust.ac.ir [Cement Research Center, School of Chemical Engineering, Iran University of Science and Technology, Narmak, Tehran 16846-13114 (Iran, Islamic Republic of); Rais-Ghasemi, M., E-mail: raissghasemi@bhrc.ac.ir [Dep. of Concrete Technology, Building and Housing Research Center (BHRC), Tehran (Iran, Islamic Republic of); Zarrabi, B.A., E-mail: zarrabi@chalmers.se [Fire Technology Dep., SP Technical Research Institute of Sweden (Sweden); Parhizkar, T., E-mail: parhizkar@bhrc.ac.ir [Dep. of Concrete Technology, Building and Housing Research Center (BHRC), Tehran (Iran, Islamic Republic of)

    2011-02-20

    Fire resistance of self-compacting concretes (SCC) containing limestone and quartz powders, with two different compressive strengths, were evaluated and compared with normal concretes (NC). The residual mechanical strengths of the mixes at different temperatures were measured. The changes in the phase composition of the cement pastes at high temperatures were examined with thermal analysis and X-ray diffractometry methods. The SCC mixes showed a higher susceptibility to spalling at high temperatures but the NC mixes suffered much more from loss of the mechanical strengths. Both the powder types and the compressive strength notably influenced the fire behavior of the SCC. The quartz powder accelerated the hydration of the SCC cement paste at high temperatures, up to 500 {sup o}C. However, the quartz-contained SCC showed the highest risk of spalling among all the mixes. The results showed that the thermal analysis could be a useful device for evaluating the fire behavior of building materials.

  16. Nuclear reactor container

    International Nuclear Information System (INIS)

    Ishiyama, Takenori.

    1989-01-01

    This invention concerns a nuclear reactor container in which heat is removed from a container by external water injection. Heat is removed from the container by immersing the lower portion of the container into water and scattering spary water from above. Thus, the container can be cooled by the spray water falling down along the outer wall of the container to condensate and cool vapors filled in the container upon occurrence of accidents. Further, since the inside of the container can be cooled also during usual operation, it can also serve as a dry well cooler. Accordingly, heat is removed from the reactor container upon occurrence of accidents by the automatic operation of a spray device corresponding to the change of the internal temperature and the pressure in the reactor container. Further, since all of these devices are disposed out of container, maintenance is also facilitated. (I.S.)

  17. Real-time Tumor Oxygenation Changes After Single High-dose Radiation Therapy in Orthotopic and Subcutaneous Lung Cancer in Mice: Clinical Implication for Stereotactic Ablative Radiation Therapy Schedule Optimization

    Energy Technology Data Exchange (ETDEWEB)

    Song, Changhoon [Department of Radiation Oncology, Seoul National University College of Medicine, Seoul (Korea, Republic of); Hong, Beom-Ju; Bok, Seoyeon; Lee, Chan-Ju; Kim, Young-Eun [Division of Integrative Biosciences and Biotechnology, Pohang University of Science and Technology, Pohang, Gyeongbuk (Korea, Republic of); Jeon, Sang-Rok [Department of Radiation Oncology, Seoul National University College of Medicine, Seoul (Korea, Republic of); Cancer Research Institute, Seoul National University College of Medicine, Seoul (Korea, Republic of); Wu, Hong-Gyun [Department of Radiation Oncology, Seoul National University College of Medicine, Seoul (Korea, Republic of); Cancer Research Institute, Seoul National University College of Medicine, Seoul (Korea, Republic of); Institute of Radiation Medicine, Medical Research Center, Seoul National University College of Medicine, Seoul (Korea, Republic of); Lee, Yun-Sang [Department of Nuclear Medicine, Seoul National University College of Medicine, Seoul (Korea, Republic of); Department of Molecular Medicine and Biopharmaceutical Sciences, Seoul National University College of Medicine, Seoul (Korea, Republic of); Cheon, Gi Jeong; Paeng, Jin Chul [Cancer Research Institute, Seoul National University College of Medicine, Seoul (Korea, Republic of); Institute of Radiation Medicine, Medical Research Center, Seoul National University College of Medicine, Seoul (Korea, Republic of); Department of Nuclear Medicine, Seoul National University College of Medicine, Seoul (Korea, Republic of); Carlson, David J. [Department of Therapeutic Radiology, Yale University School of Medicine, New Haven, Connecticut (United States); and others

    2016-07-01

    Purpose: To investigate the serial changes of tumor hypoxia in response to single high-dose irradiation by various clinical and preclinical methods to propose an optimal fractionation schedule for stereotactic ablative radiation therapy. Methods and Materials: Syngeneic Lewis lung carcinomas were grown either orthotopically or subcutaneously in C57BL/6 mice and irradiated with a single dose of 15 Gy to mimic stereotactic ablative radiation therapy used in the clinic. Serial [{sup 18}F]-misonidazole (F-MISO) positron emission tomography (PET) imaging, pimonidazole fluorescence-activated cell sorting analyses, hypoxia-responsive element-driven bioluminescence, and Hoechst 33342 perfusion were performed before irradiation (day −1), at 6 hours (day 0), and 2 (day 2) and 6 (day 6) days after irradiation for both subcutaneous and orthotopic lung tumors. For F-MISO, the tumor/brain ratio was analyzed. Results: Hypoxic signals were too low to quantitate for orthotopic tumors using F-MISO PET or hypoxia-responsive element-driven bioluminescence imaging. In subcutaneous tumors, the maximum tumor/brain ratio was 2.87 ± 0.483 at day −1, 1.67 ± 0.116 at day 0, 2.92 ± 0.334 at day 2, and 2.13 ± 0.385 at day 6, indicating that tumor hypoxia was decreased immediately after irradiation and had returned to the pretreatment levels at day 2, followed by a slight decrease by day 6 after radiation. Pimonidazole analysis also revealed similar patterns. Using Hoechst 33342 vascular perfusion dye, CD31, and cleaved caspase 3 co-immunostaining, we found a rapid and transient vascular collapse, which might have resulted in poor intratumor perfusion of F-MISO PET tracer or pimonidazole delivered at day 0, leading to decreased hypoxic signals at day 0 by PET or pimonidazole analyses. Conclusions: We found tumor hypoxia levels decreased immediately after delivery of a single dose of 15 Gy and had returned to the pretreatment levels 2 days after irradiation and had decreased

  18. Cbs (Contrastrain Based Schedulling Adalah Faktor Penentu Keberhasilan Perusahanan Printing

    Directory of Open Access Journals (Sweden)

    Hendra Achmadi

    2010-06-01

    Full Text Available In a highly competitive industry faces today ranging from small or home-based printing to using machine that can print offset a hundred thousand copies per hour. But, the increasing competition resulted in requiring a faster production time from order entry, print proff until the production process to delivery to customers. Often times in case of orders which will result in the concurrent PPIC will experience vertigo in the setting of production schedules which have concurrent delivery time. Often will end up with no receipt of orders due to difficulties in the production schedule, especially if the orders require the same offset machine and cylinder wear the same length, while the number of cylinders is limited. Therefore, the printing company should be able to do so in the conduct of a penetration timing of production can easily be simulated and implemented on the ground. CBS (Base Constraint scheduling is a technique to do the scheduling of production so that production can be carried out smoothly and quickly that fulfill the promise made to customers. In scheduling, there are several techniques that can be used are: FCFS (First Came First Serve, EDD (Earliest Date, and LCLS (Last Came Last Serve. So, it is required to be able to do way better scheduling to get results quickly in this fast changing schedules.

  19. Real-time scheduling of software tasks

    International Nuclear Information System (INIS)

    Hoff, L.T.

    1995-01-01

    When designing real-time systems, it is often desirable to schedule execution of software tasks based on the occurrence of events. The events may be clock ticks, interrupts from a hardware device, or software signals from other software tasks. If the nature of the events, is well understood, this scheduling is normally a static part of the system design. If the nature of the events is not completely understood, or is expected to change over time, it may be necessary to provide a mechanism for adjusting the scheduling of the software tasks. RHIC front-end computers (FECs) provide such a mechanism. The goals in designing this mechanism were to be as independent as possible of the underlying operating system, to allow for future expansion of the mechanism to handle new types of events, and to allow easy configuration. Some considerations which steered the design were programming paradigm (object oriented vs. procedural), programming language, and whether events are merely interesting moments in time, or whether they intrinsically have data associated with them. The design also needed to address performance and robustness tradeoffs involving shared task contexts, task priorities, and use of interrupt service routine (ISR) contexts vs. task contexts. This paper will explore these considerations and tradeoffs

  20. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  1. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  2. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  3. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  4. Comparative study on the change in index of refraction in ion-exchange interdiffusion in alkali-silicate glasses containing calcium, strontium, barium and titanium oxides

    International Nuclear Information System (INIS)

    Livshits, V.Ya.; Marchuk, E.A.

    1993-01-01

    Different ability to ion exchange from the salts of lithium-sodium-silicate glass melt containing calcium (or strontium, or barium) and titanium oxides in addition has been shown. CaO, SrO and BaO have negative effect, but TiO 2 -positive one on the fullness of ion exchange of lithium-sodium and on the rate of interdiffusion in alkali-silicate glass. The value of change in index of refraction of glass with TiO 2 is twice higher than glass with calcium oxide (or strontium, or barium) as the fourth component

  5. Fluorescent Oligonucleotides Containing a 2-Ethynylfluorene-or 2-Ethynylfluorenone-labeled 2'-Deoxyguanosine Unit: Fluorescence Changes upon Duplex Formation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Min Ji; Hwang, Gil Tae [Kyungpook National University, Daegu (Korea, Republic of)

    2016-08-15

    Two new DNA probes bearing a fluorescent deoxyguanosine unit labeled with 2-ethynylfluorene (G{sup FL} )or 2-ethynylfluorenone (G{sup FO}) were synthesized and examined for their efficiency as quencher-free linear beacon probes. Oligodeoxynucleotides (ODNs) containing a G{sup FL} or G{sup FO} unit exhibit low thermal selectivity and few distinctive fluorescence changes upon duplex formation due to the syn conformation about the glycosidic bond. An exciplex emission was observed when the G{sup FL} unit of ODNs bearing adenine flanking bases was positioned opposite to the adenine nucleobases.

  6. Reducing Downlink Signaling Traffic in Wireless Systems Using Mobile-Assisted Scheduling

    OpenAIRE

    Moosavi, Reza; Larsson, Erik G.

    2010-01-01

    We present an idea to reduce the part of the downlink signaling traffic in wireless multiple access systems that contains scheduling information. The theoretical basis of the scheme is that the scheduling decisions made by the base station are correlated with the CSI reports from the mobiles. This correlation can be exploited by the source coding scheme that is used to compress the scheduling maps before they are sent to the mobiles. In the proposed scheme, this idea is implemented by letting...

  7. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2011-01-21

    This document contains the calendar year 2011 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2011, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2011.

  8. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2007-01-31

    This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.

  9. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  10. Shift work schedule and night work load: Effects on body mass index - a four-year longitudinal study.

    Science.gov (United States)

    Buchvold, Hogne Vikanes; Pallesen, Ståle; Waage, Siri; Bjorvatn, Bjørn

    2018-05-01

    Objectives The aim of this study was to investigate changes in body mass index (BMI) between different work schedules and different average number of yearly night shifts over a four-year follow-up period. Methods A prospective study of Norwegian nurses (N=2965) with different work schedules was conducted: day only, two-shift rotation (day and evening shifts), three-shift rotation (day, evening and night shifts), night only, those who changed towards night shifts, and those who changed away from schedules containing night shifts. Paired student's t-tests were used to evaluate within subgroup changes in BMI. Multiple linear regression analysis was used to evaluate between groups effects on BMI when adjusting for BMI at baseline, sex, age, marital status, children living at home, and years since graduation. The same regression model was used to evaluate the effect of average number of yearly night shifts on BMI change. Results We found that night workers [mean difference (MD) 1.30 (95% CI 0.70-1.90)], two shift workers [MD 0.48 (95% CI 0.20-0.75)], three shift workers [MD 0.46 (95% CI 0.30-0.62)], and those who changed work schedule away from [MD 0.57 (95% CI 0.17-0.84)] or towards night work [MD 0.63 (95% CI 0.20-1.05)] all had significant BMI gain (Pnight workers had significantly larger BMI gain compared to day workers [B=0.89 (95% CI 0.06-1.72), Pnight shifts and BMI change using our multiple linear regression model. Conclusions After adjusting for possible confounders, we found that BMI increased significantly more among night workers compared to day workers.

  11. Flexible ship loading problem with transfer vehicle assignment and scheduling

    DEFF Research Database (Denmark)

    Iris, Çağatay; Christensen, Jonas; Pacino, Dario

    2018-01-01

    This paper presents the flexible containership loading problem for seaport container terminals. The integrated management of loading operations, planning of the transport vehicles to use and their scheduling is what we define as the Flexible Ship Loading Problem (FSLP). The flexibility comes from...

  12. Fecal microbiota changes with the consumption of follow-up formulas containing Bifidobacterium spp. and/or galactooligosaccharides by rats and a follow-up infant formula containing Bifidobacterium spp. by human infants

    NARCIS (Netherlands)

    Perez-Conesa, D.; Lopez, G.; Ros, G.H.; Abellan, P.; Hartemink, R.

    2006-01-01

    Seven groups of rats were fed during 1 mo using 1 infant formula containing Bifidobacterium bifidum and Bifidobacterium longum, 3 infant formulas containing 4-galactosyllactose at 1.2%, 5.0%, and 10.0%, and 3 infant formulas containing both ingredients. During 3 periods, corresponding to day 8 to

  13. Master schedule for CY-1982 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites

  14. A greedy double swap heuristic for nurse scheduling

    Directory of Open Access Journals (Sweden)

    Murphy Choy

    2012-10-01

    Full Text Available One of the key challenges of nurse scheduling problem (NSP is the number of constraints placed on preparing the timetable, both from the regulatory requirements as well as the patients’ demand for the appropriate nursing care specialists. In addition, the preferences of the nursing staffs related to their work schedules add another dimension of complexity. Most solutions proposed for solving nurse scheduling involve the use of mathematical programming and generally considers only the hard constraints. However, the psychological needs of the nurses are ignored and this resulted in subsequent interventions by the nursing staffs to remedy any deficiency and often results in last minute changes to the schedule. In this paper, we present a staff preference optimization framework solved with a greedy double swap heuristic. The heuristic yields good performance in speed at solving the problem. The heuristic is simple and we will demonstrate its performance by implementing it on open source spreadsheet software.

  15. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  16. Using Irrigation Scheduling to Increase Water Productivity of Wheat-Maize Rotation under Climate Change Conditions Calendario de Riego para Aumentar la Productividad del Agua en Rotación Trigo-Maíz en Condiciones de Cambio Climático

    Directory of Open Access Journals (Sweden)

    Gamal El Afandi

    2010-09-01

    Full Text Available Irrigation scheduling was used to increase water productivity of wheat (Triticum aestivum L.-maize (Zea mays L. rotation under two climate change scenarios. Three wheat varieties and two maize hybrids were planted at in a 2-yr field experiment. CropSyst model was calibrated and validated for the collected field data, then was used to assess the impact of two climate change scenarios (A2 and B2 and three adaptation strategies (early sowing changing, irrigation schedule and the interaction between them in the year of 2038s. The results revealed that A2 reduced yield more than B2 scenario for both crops. High yield reduction in wheat-maize rotation could be expected under climate change conditions, where wheat and maize yield will be reduced by an average of 41 and 56%, respectively. The most effective adaptation strategy for wheat was sowing 3 wk earlier and irrigation every 21 d, with irrigation water saving and no yield improvement under A2 scenario in both growing seasons. Whereas under B2 scenario yield improvement by 2% occurred with 3% saving in the applied irrigation water in the 1st growing season and in the 2nd growing season yield could improved by 8% with less than 1% increase in the applied irrigation water and higher water productivity. Changing irrigation schedule was an effective adaptation option for maize, where yield improvement could occur under both climate change scenarios in both growing seasons by up to 9% with less than 3% increase in the applied irrigation water and higher water productivity.

  17. Shielding container

    International Nuclear Information System (INIS)

    Darling, K.A.M.

    1981-01-01

    A shielding container incorporates a dense shield, for example of depleted uranium, cast around a tubular member of curvilinear configuration for accommodating a radiation source capsule. A lining for the tubular member, in the form of a close-coiled flexible guide, provides easy replaceability to counter wear while the container is in service. Container life is extended, and maintenance costs are reduced. (author)

  18. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  19. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  20. How useful are preemptive schedules?

    NARCIS (Netherlands)

    Brucker, P.; Heitmann, S.; Hurink, J.L.

    2001-01-01

    Machine scheduling admits two options to process jobs. In a preemptive mode processing may be interrupted and resumed later even on a different machine. In a nonpreemptive mode interruptions are not allowed. Usually, the possibility to preempt jobs leads to better performance values. However, also

  1. Interaction in activity location scheduling

    NARCIS (Netherlands)

    Tabak, V.; Vries, de B.; Dijkstra, J.; Jessurun, A.J.

    2006-01-01

    In this paper we discuss the interaction in activity location scheduling which is the main subject of an ongoing research project called "User Simulation of Space Utilization". The aim of this research project is to develop an overall model for the simulation of human movement and utilization of

  2. Scheduling with target start times

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.; Klein Haneveld, W.K.; Vrieze, O.J.; Kallenberg, L.C.M.

    1997-01-01

    We address the single-machine problem of scheduling n independent jobs subject to target start times. Target start times are essentially release times that may be violated at a certain cost. The goal is to minimize an objective function that is composed of total completion time and maximum

  3. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  4. Scheduling periodic tasks with slack

    NARCIS (Netherlands)

    Korst, J.H.M.; Aarts, E.H.L.; Lenstra, J.K.

    1997-01-01

    We consider the problem of nonpreemptively scheduling periodic tasks on a minimum number of identical processors, assuming that some slack is allowed in the time between successive executions of a periodic task. We prove that the problem is NP-hard in the strong sense. Necessary and sufficient

  5. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    replace earlier versions of the F/A-18. Joint and International Nature At the time of JSF conception, there was a clear preference at the highest levels...ALPHABET SOUP ” (Aboulafia, 2015) OF STUDIES AND CONCEPTS • … MERGED INTO JAST • … WHICH EVOLVED TO JSF • WELL-KNOWN COST AND SCHEDULE

  6. Analyzing NPS Scheduling Using OSIRIS

    Science.gov (United States)

    1993-03-01

    School TEACHER SCHEDULE BLOCKS REPORT Date: 2/19/93 Period Name ID Term Days 1234 Adragna , Joe 170401 1 F xx Agrawal, Brij 120101 1 F xx Almquist...LOAD REPORT Date: 3/18/93 Total Max Consec Total Teacher ID Term Classes Classes Stud Adragna , Joe 170401 1 1 1 3 Agrawal, Brij 120101 1 2 2 98 Aiello

  7. Data Bank 10 - Form 41 Financial Schedules of U.S. Air Carriers : second quarter.

    Science.gov (United States)

    2010-01-01

    This CD presents financial data for large certificated U.S. carriers. Schedule B-1 presents the balance sheets of the carrier's accounting reports. Schedules P-1 and P-6 contain profit and loss data (income and expense items) for the carrier's operat...

  8. Data Bank 10 - Form 41 Financial Schedules of U.S. Air Carriers : fourth quarter.

    Science.gov (United States)

    2011-01-01

    This CD presents financial data for large certificated U.S. carriers. Schedule B-1 presents the balance sheets of the carrier's accounting reports. Schedules P-1 and P-6 contain profit and loss data (income and expense items) for the carrier's operat...

  9. Data Bank 10 - Form 41 Financial Schedules of U.S. Air Carriers : first quarter.

    Science.gov (United States)

    2009-01-01

    This CD presents financial data for large certificated U.S. carriers. Schedule B-1 presents the balance sheets of the carrier's accounting reports. Schedules P-1 and P-6 contain profit and loss data (income and expense items) for the carrier's operat...

  10. Data Bank 10 - Form 41 Financial Schedules of U.S. Air Carriers : first quarter.

    Science.gov (United States)

    2014-01-01

    This CD presents financial data for large certificated U.S. carriers. Schedule B-1 presents the balance sheets of the carrier's accounting reports. Schedules P-1 and P-6 contain profit and loss data (income and expense items) for the carrier's operat...

  11. Data Bank 10 - Form 41 Financial Schedules of U.S. Air Carriers : second quarter.

    Science.gov (United States)

    2013-01-01

    This CD presents financial data for large certificated U.S. carriers. Schedule B-1 presents the balance sheets of the carrier's accounting reports. Schedules P-1 and P-6 contain profit and loss data (income and expense items) for the carrier's operat...

  12. Data Bank 10 - Form 41 Financial Schedules of U.S. Air Carriers : fourth quarter.

    Science.gov (United States)

    2013-01-01

    This CD presents financial data for large certificated U.S. carriers. Schedule B-1 presents the balance sheets of the carrier's accounting reports. Schedules P-1 and P-6 contain profit and loss data (income and expense items) for the carrier's operat...

  13. Data Bank 10 - Form 41 Financial Schedules of U.S. Air Carriers : third quarter.

    Science.gov (United States)

    2013-01-01

    This CD presents financial data for large certificated U.S. carriers. Schedule B-1 presents the balance sheets of the carrier's accounting reports. Schedules P-1 and P-6 contain profit and loss data (income and expense items) for the carrier's operat...

  14. Reactor container

    International Nuclear Information System (INIS)

    Ichiki, Tadaharu; Saba, Kazuhisa.

    1979-01-01

    Purpose: To improve the earthquake resistance as well as reduce the size of a container for a nuclear reactor with no adverse effects on the decrease of impact shock to the container and shortening of construction step. Constitution: Reinforcing profile steel materials are welded longitudinally and transversely to the inner surface of a container, and inner steel plates are secured to the above profile steel materials while keeping a gap between the materials and the container. Reactor shielding wall planted to the base concrete of the container is mounted to the pressure vessel, and main steam pipeways secured by the transverse beams and led to the outside of container is connected. This can improve the rigidity earthquake strength and the safetiness against the increase in the inside pressure upon failures of the container. (Yoshino, Y.)

  15. Space network scheduling benchmark: A proof-of-concept process for technology transfer

    Science.gov (United States)

    Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy

    1993-01-01

    This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.

  16. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1999-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations

  17. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    visibility, sky background, required time sampling coverage) and the dynamic change of the system conditions (i.e., weather, system conditions). Off-line and on-line strategies are integrated into a single tool for a suitable transfer of the target prioritization made by the science team to the real-time schedule that will be used by the instrument operators. A suitable solution will be expected to increase the efficiency of telescope operations, which will represent an important benefit in terms of scientific return and operational costs. We present the operational scheduling tool designed for CARMENES, which is based on two algorithms combining a global and a local search: Genetic Algorithms and Hill Climbing astronomy-based heuristics, respectively. The algorithm explores a large amount of potential solutions from the vast search space and is able to identify the most efficient ones. A planning solution is considered efficient when it optimizes the objectives defined, which, in our case, are related to the reduction of the time that the telescope is not in use and the maximization of the scientific return, measured in terms of the time coverage of each target in the survey. We present the results obtained using different test cases.

  18. Scheduling Accessory Assists Patients with Cognitive Disorders

    Science.gov (United States)

    2007-01-01

    Recom Technologies Inc. received initial funding from NASA to research the commercial potential of an artificially intelligent planning reaction model to serve as a tool to help individuals suffering from various forms and levels of brain impairment. In 1993, the chief of the Artificial Intelligence Research Branch at Ames Research Center suggested collaborative research with Santa Clara Valley Medical Center. This partnership led to further development of the technology and funding to support clinical research from the U.S. Department of Education's National Institute on Disability and Rehabilitation Research. In 1996, Attention Control Systems Inc. was founded to market the finished device, called the Planning and Execution Assistant and Trainer (PEAT). PEAT is a pocket-sized PDA-like device with a graphical display, touchscreen controls, an electronic calendar, an address book, and a built-in phone, that cues users to start or stop scheduled activities, monitors their progress, and adjusts schedules as necessary in response to delays or calendar changes. It uses an automatic planning model developed for NASA to adjust daily plans when a situation changes. PEAT is sold as a complete system that includes software, hardware, documentation, and technical support. In addition to the flagship Pocket PEAT device, there is PEAT Phone, PC PEAT, and PEAT Link. Clinical studies of PEAT continue at Santa Clara Valley Medical Center

  19. A Review Of Fault Tolerant Scheduling In Multicore Systems

    Directory of Open Access Journals (Sweden)

    Shefali Malhotra

    2015-05-01

    Full Text Available Abstract In this paper we have discussed about various fault tolerant task scheduling algorithm for multi core system based on hardware and software. Hardware based algorithm which is blend of Triple Modulo Redundancy and Double Modulo Redundancy in which Agricultural Vulnerability Factor is considered while deciding the scheduling other than EDF and LLF scheduling algorithms. In most of the real time system the dominant part is shared memory.Low overhead software based fault tolerance approach can be implemented at user-space level so that it does not require any changes at application level. Here redundant multi-threaded processes are used. Using those processes we can detect soft errors and recover from them. This method gives low overhead fast error detection and recovery mechanism. The overhead incurred by this method ranges from 0 to 18 for selected benchmarks. Hybrid Scheduling Method is another scheduling approach for real time systems. Dynamic fault tolerant scheduling gives high feasibility rate whereas task criticality is used to select the type of fault recovery method in order to tolerate the maximum number of faults.

  20. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  1. A container

    DEFF Research Database (Denmark)

    2012-01-01

    A container assembly for the containment of fluids or solids under a pressure different from the ambient pressure comprising a container (2) comprising an opening and an annular sealing, a lid (3) comprising a central portion (5) and engagement means (7) for engaging the annular flange, and sealing...... means (10) wherein the engagement means (7) is adapted, via the sealing means, to seal the opening when the pressure of the container assembly differs from the ambient pressure in such a way that the central portion (5) flexes in the axial direction which leads to a radial tightening of the engagement...... means (7) to the container, wherein the container further comprises locking means (12) that can be positioned so that the central portion is hindered from flexing in at least one direction....

  2. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  3. Shielded container

    International Nuclear Information System (INIS)

    Fries, B.A.

    1978-01-01

    A shielded container for transportation of radioactive materials is disclosed in which leakage from the container is minimized due to constructional features including, inter alia, forming the container of a series of telescoping members having sliding fits between adjacent side walls and having at least two of the members including machine sealed lids and at least two of the elements including hand-tightenable caps

  4. Radioactive Waste Management System: Draft Project Decision Schedule. Revision

    International Nuclear Information System (INIS)

    1985-07-01

    The Nuclear Waste Policy Act (NWPA) of 1982 (Pub. L. 97-425) requires that the Secretary of Energy prepare, in cooperation with affected Federal agencies, a Project Decision Schedule that portrays the optimum way to attain the operation of geologic repositories. The Draft Project Decision Schedule portrays the major milestones of the Radioactive Waste Management System. It also depicts the set of activities for which Federal agencies have responsibility and the deadlines for taking the required action that are associated with the activities. The NWPA also requires that Federal agencies having determined that they: (1) cannot comply with a deadline for taking a required action; or (2) fail to comply with a deadline contained in the Project Decision Schedule; submit a comprehensive report to the Secretary of Energy and Congress to explain their failure or expected failure. The Secretary, in turn, is required to submit to Congress a response to the agency's report. 7 figs., 13 tabs

  5. Spatio-temporal morphology changes in and quenching effects on the 2D spreading dynamics of cell colonies in both plain and methylcellulose-containing culture media.

    Science.gov (United States)

    Muzzio, N E; Pasquale, M A; Huergo, M A C; Bolzán, A E; González, P H; Arvia, A J

    2016-06-01

    To deal with complex systems, microscopic and global approaches become of particular interest. Our previous results from the dynamics of large cell colonies indicated that their 2D front roughness dynamics is compatible with the standard Kardar-Parisi-Zhang (KPZ) or the quenched KPZ equations either in plain or methylcellulose (MC)-containing gel culture media, respectively. In both cases, the influence of a non-uniform distribution of the colony constituents was significant. These results encouraged us to investigate the overall dynamics of those systems considering the morphology and size, the duplication rate, and the motility of single cells. For this purpose, colonies with different cell populations (N) exhibiting quasi-circular and quasi-linear growth fronts in plain and MC-containing culture media are investigated. For small N, the average radial front velocity and its change with time depend on MC concentration. MC in the medium interferes with cell mitosis, contributes to the local enlargement of cells, and increases the distribution of spatio-temporal cell density heterogeneities. Colony spreading in MC-containing media proceeds under two main quenching effects, I and II; the former mainly depending on the culture medium composition and structure and the latter caused by the distribution of enlarged local cell domains. For large N, colony spreading occurs at constant velocity. The characteristics of cell motility, assessed by measuring their trajectories and the corresponding velocity field, reflect the effect of enlarged, slow-moving cells and the structure of the medium. Local average cell size distribution and individual cell motility data from plain and MC-containing media are qualitatively consistent with the predictions of both the extended cellular Potts models and the observed transition of the front roughness dynamics from a standard KPZ to a quenched KPZ. In this case, quenching effects I and II cooperate and give rise to the quenched

  6. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker cons...... consumption and the impact on the remaining network and the customer service level. The model is applied to 4 real cases from Maersk Line. Solutions are comparable or superior to those chosen by operations managers. Cost savings of up to 58% may be achieved.......Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  7. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  8. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  9. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  10. Preemptive scheduling in overloaded systems

    Czech Academy of Sciences Publication Activity Database

    Chrobak, M.; Epstein, L.; Noga, J.; Sgall, Jiří; van Stee, R.; Tichý, Tomáš; Vakhania, N.

    2003-01-01

    Roč. 67, č. 1 (2003), s. 183-197 ISSN 0022-0000 R&D Projects: GA ČR GA201/01/1195; GA MŠk ME 476; GA AV ČR IAA1019901; GA MŠk LN00A056 Institutional research plan: CEZ:AV0Z1019905; CEZ:AV0Z1019905 Keywords : scheduling * online algorithms * benefit Subject RIV: BA - General Mathematics Impact factor: 0.795, year: 2003

  11. WCET Analysis for Preemptive Scheduling

    OpenAIRE

    Altmeyer, Sebastian; Gebhard, Gernot

    2008-01-01

    Hard real-time systems induce strict constraints on the timing of the task set. Validation of these timing constraints is thus a major challenge during the design of such a system. Whereas the derivation of timing guarantees must already be considered complex if tasks are running to completion, it gets even more complex if tasks are scheduled preemptively -- especially due to caches, deployed to improve the average performance. In this paper we propose a new method to compu...

  12. Scheduling Maintenance Jobs in Networks

    OpenAIRE

    Abed, Fidaa; Chen, Lin; Disser, Yann; Groß, Martin; Megow, Nicole; Meißner, Julie; Richter, Alexander T.; Rischke, Roman

    2017-01-01

    We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time; for the special case of path networks, this is related to the problem of minimizing the busy time of machines. We show that the problem can be solved in polynomial time in arbitrary networks if preemption is allowed. If preemption is restricted to integral t...

  13. Schedule of the nuclear program

    International Nuclear Information System (INIS)

    Heigl, F.

    1977-01-01

    The lecure tries to explain the main phases which must be passed to establish nuclear power plants, the feasibility phase, preconstruction and construction phase. Each phase consists of a lot of activities which are commented. Further the lecture tries to give some ideas of durances and dependence between the phases or activities to get a complete time schedule of the realization of a nuclear power project. (HP) [de

  14. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  15. Reactor container

    International Nuclear Information System (INIS)

    Fukazawa, Masanori.

    1991-01-01

    A system for controlling combustible gases, it has been constituted at present such that the combustible gases are controlled by exhausting them to the wet well of a reactor container. In this system, however, there has been a problem, in a reactor container having plenums in addition to the wet well and the dry well, that the combustible gases in such plenums can not be controlled. In view of the above, in the present invention, suction ports or exhaust ports of the combustible gas control system are disposed to the wet well, the dry well and the plenums to control the combustible gases in the reactor container. Since this can control the combustible gases in the entire reactor container, the integrity of the reactor container can be ensured. (T.M.)

  16. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  17. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  18. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  19. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  20. A trial of scheduled deep brain stimulation for Tourette syndrome: moving away from continuous deep brain stimulation paradigms.

    Science.gov (United States)

    Okun, Michael S; Foote, Kelly D; Wu, Samuel S; Ward, Herbert E; Bowers, Dawn; Rodriguez, Ramon L; Malaty, Irene A; Goodman, Wayne K; Gilbert, Donald M; Walker, Harrison C; Mink, Jonathan W; Merritt, Stacy; Morishita, Takashi; Sanchez, Justin C

    2013-01-01

    To collect the information necessary to design the methods and outcome variables for a larger trial of scheduled deep brain stimulation (DBS) for Tourette syndrome. We performed a small National Institutes of Health-sponsored clinical trials planning study of the safety and preliminary efficacy of implanted DBS in the bilateral centromedian thalamic region. The study used a cranially contained constant-current device and a scheduled, rather than the classic continuous, DBS paradigm. Baseline vs 6-month outcomes were collected and analyzed. In addition, we compared acute scheduled vs acute continuous vs off DBS. A university movement disorders center. Five patients with implanted DBS. A 50% improvement in the Yale Global Tic Severity Scale (YGTSS) total score. RESULTS Participating subjects had a mean age of 34.4 (range, 28-39) years and a mean disease duration of 28.8 years. No significant adverse events or hardware-related issues occurred. Baseline vs 6-month data revealed that reductions in the YGTSS total score did not achieve the prestudy criterion of a 50% improvement in the YGTSS total score on scheduled stimulation settings. However, statistically significant improvements were observed in the YGTSS total score (mean [SD] change, -17.8 [9.4]; P=.01), impairment score (-11.3 [5.0]; P=.007), and motor score (-2.8 [2.2]; P=.045); the Modified Rush Tic Rating Scale Score total score (-5.8 [2.9]; P=.01); and the phonic tic severity score (-2.2 [2.6]; P=.04). Continuous, off, and scheduled stimulation conditions were assessed blindly in an acute experiment at 6 months after implantation. The scores in all 3 conditions showed a trend for improvement. Trends for improvement also occurred with continuous and scheduled conditions performing better than the off condition. Tic suppression was commonly seen at ventral (deep) contacts, and programming settings resulting in tic suppression were commonly associated with a subjective feeling of calmness. This study provides

  1. Optimizing an F-16 Squadron Weekly Pilot Schedule for the Turkish Air Force

    Science.gov (United States)

    2010-03-01

    disrupted schedules are rescheduled , minimizing the total number of changes with respect to the previous schedule’s objective function. Output...producing rosters for a nursing staff in a large general hospital (Dowsland, 1998) and afterwards Aickelin and Dowsland use an Indirect Genetic...algorithm to improve the solutions of the nurse scheduling problem which is similar to the fighter squadron pilot scheduling problem (Aickelin and

  2. Reactor containment

    International Nuclear Information System (INIS)

    Kawabe, Ryuhei; Yamaki, Rika.

    1990-01-01

    A water vessel is disposed and the gas phase portion of the water vessel is connected to a reactor container by a pipeline having a valve disposed at the midway thereof. A pipe in communication with external air is extended upwardly from the liquid phase portion to a considerable height so as to resist against the back pressure by a waterhead in the pipeline. Accordingly, when the pressure in the container is reduced to a negative level, air passes through the pipeline and uprises through the liquid phase portion in the water vessel in the form of bubbles and then flows into the reactor container. When the pressure inside of the reactor goes higher, since the liquid surface in the water vessel is forced down, water is pushed up into the pipeline. Since the waterhead pressure of a column of water in the pipeline and the pressure of the reactor container are well-balanced, gases in the reactor container are not leaked to the outside. Further, in a case if a great positive pressure is formed in the reactor container, the inner pressure overcomes the waterhead of the column of water, so that the gases containing radioactive aerosol uprise in the pipeline. Since water and the gases flow being in contact with each other, this can provide the effect of removing aerosol. (T.M.)

  3. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  4. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  5. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  6. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  7. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  8. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  9. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  10. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  11. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  12. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2006-01-27

    This document contains the calendar year 2006 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2006 in which case the anticipated year for collection is provided. The project document package (PDP) for Surface Environmental Surveillance contains the milestone control log for the issuing of CY06 Environmental Surveillance Master Sampling Schedule WBS 4.2.3.21.3.03, milestone: RL00430306 (4830106-12).

  13. Sharps container

    Science.gov (United States)

    Lee, Angelene M. (Inventor)

    1992-01-01

    This invention relates to a system for use in disposing of potentially hazardous items and more particularly a Sharps receptacle for used hypodermic needles and the like. A Sharps container is constructed from lightweight alodined nonmagnetic metal material with a cup member having an elongated tapered shape and length greater than its transverse dimensions. A magnet in the cup member provides for metal retention in the container. A nonmagnetic lid member has an opening and spring biased closure flap member. The flap member is constructed from stainless steel. A Velcro patch on the container permits selective attachment at desired locations.

  14. Scheduling of Irrigation and Leaching Requirements

    Directory of Open Access Journals (Sweden)

    Amer Hassan Al-haddad

    2015-03-01

    Full Text Available Iraq depends mainly on Tigris and Euphrates Rivers to provide high percentage of agricultural water use for thousands years. At last years, Iraq is suffering from shortage in water resources due to global climate changes and unfair water politics of the neighboring countries, which affected the future of agriculture plans for irrigation, added to that the lack of developed systems of water management in the irrigation projects and improper allocation of irrigation water, which reduces water use efficiency and lead to losing irrigation water and decreasing in agricultural yield. This study aims at studying the usability of irrigation and leaching scheduling within the irrigating projects and putting a complete annual or seasonal irrigation program as a solution for the scarcity of irrigation water, the increase of irrigation efficiency, lessening the salinity in the projects and preparing an integral irrigation calendar through field measurements of soil physical properties and chemical for project selected and compared to the results of the irrigation scheduling and leaching with what is proposed by the designers. The process is accomplished by using a computer program which was designed by Water Resources Department at the University of Baghdad, with some modification to generalize it and made it applicable to various climatic zone and different soil types. Study area represented by large project located at the Tigris River, and this project was (Al-Amara irrigation project. Sufficient samples of project's soil were collected so as to identify soil physical and chemical properties and the salinity of soil and water as well as identifying the agrarian cycles virtually applied to this project. Finally, a comparison was conducted between the calculated water quantities and the suggested ones by the designers. The research results showed that using this kind of scheduling (previously prepared irrigation and leaching scheduling with its properties

  15. ENHANCED HYBRID PSO – ACO ALGORITHM FOR GRID SCHEDULING

    Directory of Open Access Journals (Sweden)

    P. Mathiyalagan

    2010-07-01

    Full Text Available Grid computing is a high performance computing environment to solve larger scale computational demands. Grid computing contains resource management, task scheduling, security problems, information management and so on. Task scheduling is a fundamental issue in achieving high performance in grid computing systems. A computational GRID is typically heterogeneous in the sense that it combines clusters of varying sizes, and different clusters typically contains processing elements with different level of performance. In this, heuristic approaches based on particle swarm optimization and ant colony optimization algorithms are adopted for solving task scheduling problems in grid environment. Particle Swarm Optimization (PSO is one of the latest evolutionary optimization techniques by nature. It has the better ability of global searching and has been successfully applied to many areas such as, neural network training etc. Due to the linear decreasing of inertia weight in PSO the convergence rate becomes faster, which leads to the minimal makespan time when used for scheduling. To make the convergence rate faster, the PSO algorithm is improved by modifying the inertia parameter, such that it produces better performance and gives an optimized result. The ACO algorithm is improved by modifying the pheromone updating rule. ACO algorithm is hybridized with PSO algorithm for efficient result and better convergence in PSO algorithm.

  16. Scheduled meals and scheduled palatable snacks synchronize circadian rhythms: consequences for ingestive behavior.

    Science.gov (United States)

    Escobar, Carolina; Salgado, Roberto; Rodriguez, Katia; Blancas Vázquez, Aurea Susana; Angeles-Castellanos, Manuel; Buijs, Ruud M

    2011-09-26

    Food is a potent time signal for the circadian system and has shown to entrain and override temporal signals transmitted by the biological clock, the suprachiasmatic nucleus, which adjusts mainly to the daily light/dark (LD) alternation. Organisms mostly ingest food in their active period and this permits a correct coordination between the LD and the food elicited time signals with the circadian system. Under conditions when feeding opportunities are shifted to the usual resting/sleep phase, the potent entraining force of food, shifts circadian fluctuations in several tissues, organs, and brain structures toward meal time, resulting a desynchrony within the body and between the organism and the external LD cycle. The daily scheduled access to a palatable snack exerts similar changes specifically to brain areas involved in motivation and reward responses. This review describes the phenomenology of food entrainment and entrainment by a palatable snack. It suggests how scheduled feeding can lead to food addiction and how shifted feeding schedules toward the sleep phase can result in altered ingestive behavior, obesity and disturbed metabolic responses. Copyright © 2011 Elsevier Inc. All rights reserved.

  17. Radiological containment handbook

    International Nuclear Information System (INIS)

    1982-10-01

    The purpose of this NUREG is to be used as a reference text. It is meant to be used by the working personnel as a guide for using temporary radiological containments. The installing group and health physics group may vary among organizations but responsibilities and duties will not change. It covers installation and inspection containments; working and operating guidelines; operating requirement; emergency procedures; and removal of containments

  18. Reactor container

    International Nuclear Information System (INIS)

    Kojima, Yoshihiro; Hosomi, Kenji; Otonari, Jun-ichiro.

    1997-01-01

    In the present invention, a catalyst for oxidizing hydrogen to be disposed in a reactor container upon rupture of pipelines of a reactor primary coolant system is prevented from deposition of water droplets formed from a reactor container spray to suppress elevation of hydrogen concentration in the reactor container. Namely, a catalytic combustion gas concentration control system comprises a catalyst for oxidizing hydrogen and a support thereof. In addition, there is also disposed a water droplet deposition-preventing means for preventing deposition of water droplets in a reactor pressure vessel on the catalyst. Then, the effect of the catalyst upon catalytic oxidation reaction of hydrogen can be kept high. The local elevation of hydrogen concentration can be prevented even upon occurrence of such a phenomenon that various kinds of mobile forces in the container such as dry well cooling system are lost. (I.S.)

  19. FREIGHT CONTAINER LIFTING STANDARD

    Energy Technology Data Exchange (ETDEWEB)

    POWERS DJ; SCOTT MA; MACKEY TC

    2010-01-13

    This standard details the correct methods of lifting and handling Series 1 freight containers following ISO-3874 and ISO-1496. The changes within RPP-40736 will allow better reading comprehension, as well as correcting editorial errors.

  20. Size-based scheduling to improve web performance

    NARCIS (Netherlands)

    Harchol-Balter, M.; Schroeder, B.; Bansal, N.; Agrawal, M.

    2003-01-01

    Is it possible to reduce the expected response time of every request at a web server, simply by changing the order in which we schedule the requests? That is the question we ask in this paper.This paper proposes a method for improving the performance of web servers servicing static HTTP requests.

  1. 76 FR 39159 - Schedule for Rating Disabilities; The Digestive System

    Science.gov (United States)

    2011-07-05

    ... of this change is to incorporate medical advances that have occurred since the last review, insert current medical terminology, and provide clear criteria. DATES: Comments must be received by VA on or... the rating schedule, and implement current medical criteria and terminology that reflect recent...

  2. Gain Scheduling of Observer-Based Controllers with Integral Action

    DEFF Research Database (Denmark)

    Trangbæk, Klaus; Stoustrup, Jakob; Bendtsen, Jan Dimon

    2006-01-01

     This paper presents a method for continuous gain scheduling of  observer-based controllers with integral action. Given two stabilising controllers for a given system, explicit state space formulae are presented, allowing to change gradually from one  controller to the other while preserving...

  3. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  4. Evolution and change of He bubbles in He-containing Ti films upon thermal treatment studied by small-angle X-ray scattering and transmission electron microscopy

    Energy Technology Data Exchange (ETDEWEB)

    Sun, Guangai [Institute of Nuclear Physics and Chemistry, China Academy of Engineering Physics, Mianyang 621900 (China); College of Nuclear Science and Technology, University of Science and Technology of China, Hefei, 230029 (China); Wu, Erdong, E-mail: ewu@imr.ac.cn [National Laboratory for Materials Science, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016 (China); Huang, Chaoqiang [Institute of Nuclear Physics and Chemistry, China Academy of Engineering Physics, Mianyang 621900 (China); College of Nuclear Science and Technology, University of Science and Technology of China, Hefei, 230029 (China); Cheng, Chun [National Laboratory for Materials Science, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016 (China); Yan, Guanyun [Institute of Nuclear Physics and Chemistry, China Academy of Engineering Physics, Mianyang 621900 (China); Wang, Xiaolin [Institute of Nuclear Physics and Chemistry, China Academy of Engineering Physics, Mianyang 621900 (China); College of Nuclear Science and Technology, University of Science and Technology of China, Hefei, 230029 (China); Liu, Shi [National Laboratory for Materials Science, Institute of Metal Research, Chinese Academy of Sciences, Shenyang 110016 (China); Tian, Qiang; Chen, Bo [Institute of Nuclear Physics and Chemistry, China Academy of Engineering Physics, Mianyang 621900 (China); Wu, Zhonghua [Institute of High Energy Physics, Chinese Academy of Sciences, Beijing 100049 (China); Liu, Yi; Wang, Jie [Institute of Shanghai Apply Physics, Chinese Academy of Sciences, Shanghai 201800 (China)

    2014-05-02

    Evolution and change of He bubbles in magnetron sputtering prepared He-containing Ti films under thermal treatment are studied by small-angle X-ray scattering (SAXS), transmission electron microscopy (TEM) and X-ray diffraction. Incorporation of He introduces a large number of He-vacancy clusters and some voids in the films, and significantly increases SAXS intensity and causes anisotropic scattering. The change of He induced defects during annealing is affected by thermal diffusion and migration of trapped He to the surface and between interfaces of He induced defects within the films. Annealing at 200 and 400 °C reduces intensity and anisotropy of SAXS, in accord with observed shrinking and disappearance of the voids. The simultaneous growth of non-uniformly distributed He bubbles to the sizes of 1–2 nm and a population level of 10{sup 5}/μm{sup 3} are detected in the temperature range. The changes are explained by migration and coalescence mechanisms, which requires low apparent activation energy. Inconsistence between TEM and SAXS observations is noted and attributed to thinning induced internal stress relaxation of TEM specimen. Remarkable enlargement of He bubbles, associated with increased SAXS intensity and fractal dimension, is observed after 600 °C annealing, indicating involvement of Ostwald Ripening (OR) mechanism. The OR process dominates at 800 °C, where the high temperature provides activation energy for accelerated He dissociation from small bubbles into larger ones, and generating textured microstructure and agglomerated bubble clusters. The inhomogeneous bubble size distribution observed at this temperature covers a broad range of about 10–50 nm and possessing a population density level of 10{sup 3}/μm{sup 3}. - Highlights: • Change of He bubbles in thermally treated Ti–He films is studied by SAXS and TEM. • SAXS reveals size distribution and fractional population of He bubbles in films. • He-vacancy clusters in Ti–He film

  5. Change to Either a Nonandrogenic or Androgenic Progestin-Containing Oral Contraceptive Preparation is Associated with Improved Sexual Function in Women with Oral Contraceptive-Associated Sexual Dysfunction

    DEFF Research Database (Denmark)

    Davis, Susan R; Bitzer, Johannes; Giraldi, Annamaria

    2013-01-01

    It is a commonly held belief that combined oral contraceptive (COC) pills containing an androgenic progestin may be less likely to impair sexual function than COCs containing an anti-androgenic progestin.......It is a commonly held belief that combined oral contraceptive (COC) pills containing an androgenic progestin may be less likely to impair sexual function than COCs containing an anti-androgenic progestin....

  6. Responsive versus scheduled feeding for preterm infants.

    Science.gov (United States)

    Watson, Julie; McGuire, William

    2015-10-13

    Feeding preterm infants in response to their hunger and satiation cues (responsive, cue-based, or infant-led feeding) rather than at scheduled intervals might enhance infants' and parents' experience and satisfaction, help in the establishment of independent oral feeding, increase nutrient intake and growth rates, and allow earlier hospital discharge. To assess the effect of feeding preterm infants on a responsive basis versus feeding prescribed volumes at scheduled intervals on growth, duration of hospital stay, and parental satisfaction. We used the standard search strategy of the Cochrane Neonatal Review Group. This included searches of the Cochrane Central Register of Controlled Trials (CENTRAL, The Cochrane Library, Issue 9, 2015), MEDLINE (1966 to September 2015), EMBASE (1980 to September 2015), and CINAHL (1982 to September 2015), conference proceedings, previous reviews, and trial registries. Randomised controlled trials (RCTs) or quasi-RCTs that compared a policy of feeding preterm infants on a responsive basis versus feeding at scheduled intervals. Two review authors assessed trial eligibility and risk of bias and undertook data extraction independently. We analysed the treatment effects in the individual trials and reported the risk ratio and risk difference for dichotomous data and mean difference (MD) for continuous data, with respective 95% confidence intervals (CIs). We used a fixed-effect model in meta-analyses and explored the potential causes of heterogeneity in sensitivity analyses. We found nine eligible RCTs including 593 infants in total. These trials compared responsive with scheduled interval regimens in preterm infants in the transition phase from intragastric tube to oral feeding. The trials were generally small and contained various methodological weaknesses including lack of blinding and incomplete assessment of all randomised participants. Meta-analyses, although limited by data quality and availability, suggest that responsive feeding

  7. Tramp Ship Routing and Scheduling - Models, Methods and Opportunities

    DEFF Research Database (Denmark)

    Vilhelmsen, Charlotte; Larsen, Jesper; Lusby, Richard Martin

    of their demand in advance. However, the detailed requirements of these contract cargoes can be subject to ongoing changes, e.g. the destination port can be altered. For tramp operators, a main concern is therefore the efficient and continuous planning of routes and schedules for the individual ships. Due...... and scheduling problem, focus should now be on extending this basic problem to include additional real-world complexities and develop suitable solution methods for those extensions. Such extensions will enable more tramp operators to benefit from the solution methods while simultaneously creating new...

  8. Performance analysis of job scheduling policies in parallel supercomputing environments

    Energy Technology Data Exchange (ETDEWEB)

    Naik, V.K.; Squillante, M.S. [IBM T.J. Watson Research Center, Yorktown Heights, NY (United States); Setia, S.K. [George Mason Univ., Fairfax, VA (United States). Dept. of Computer Science

    1993-12-31

    In this paper the authors analyze three general classes of scheduling policies under a workload typical of largescale scientific computing. These policies differ in the manner in which processors are partitioned among the jobs as well as the way in which jobs are prioritized for execution on the partitions. Their results indicate that existing static schemes do not perform well under varying workloads. Adaptive policies tend to make better scheduling decisions, but their ability to adjust to workload changes is limited. Dynamic partitioning policies, on the other hand, yield the best performance and can be tuned to provide desired performance differences among jobs with varying resource demands.

  9. An Improved Scheduling Technique for Time-Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    1999-01-01

    clock synchronization and mode changes. We have improved the quality of the schedules by introducing a new priority function that takes into consideration the communication protocol. Communication has been optimized through packaging messages into slots with a properly selected order and lengths......In this paper we present an improved scheduling technique for the synthesis of time-triggered embedded systems. Our system model captures both the flow of data and that of control. We have considered communication of data and conditions for a time-triggered protocol implementation that supports...

  10. Expressional Changes of Water Transport-related Molecules in the Efferent Ductules and Initial Segment of Mouse Treated with Bisphenol A-Containing Drinking Water for Two Generations.

    Science.gov (United States)

    Han, Su-Yong; Lee, Ki-Ho

    2013-09-01

    Bisphenol A (BPA) is an estrogenic endocrine disrupter. However, depending on a way of treatment, the harmful effects of BPA have not been confirmed. Also, trans-generational effects of BPA on male reproduction are still controversial. Because the reabsorption of testicular fluid in the efferent ductules (ED) and initial segment (IS) is important for sperm maturation, the present study was designed to determine trans-generational effect of BPA administrated orally on expression of water transport-related molecules in the mouse ED and IS. Ethanol-dissolved BPA was diluted in water to be 100 ng (low), 10 μg (medium), and 1 mg/Ml water (high). BPA-containing water was provided for two generations. Expression of ion transporters and water channels in the ED and IS were measured by relative real-time PCR analysis. In the ED, BPA treatment caused expressional increases of carbonic anhydrase II, cystic fibrosis transmembrane regulator, Na(+)/K(+) ATPase α1 subunit, and aquaporin (AQP) 1. No change of Na(+)/H(+) exchange (NHE) 3 expression was detected. BPA treatment at medium dose resulted in an increase of AQP9 expression. In the IS, the highest expressional levels of all molecules tested were observed in medium-dose BPA treatment. Generally, high-dose BPA treatment resulted in a decrease or no change of gene expression. Fluctuation of NHE3 gene expression by BPA treatment at different concentrations was detected. These findings suggest that trans-generational exposure to BPA, even at low dose, could affect gene expression of water-transport related molecules. However, such effects of BPA would be differentially occurred in the ED and IS.

  11. Optimizing Unmanned Aircraft System Scheduling

    Science.gov (United States)

    2008-06-01

    ASC-U uses a deterministic algorithm to optimize over a given finite time horizon to obtain near-optimal UAS mission area assignments. ASC-U...the details of the algorithm . We set an upper bound on the total number of schedules that can be generated, so as not to create unsolvable ILPs. We...COL_MISSION_NAME)) If Trim( CStr (rMissions(iRow, COL_MISSION_REQUIRED))) <> "" Then If CLng(rMissions(iRow, COL_MISSION_REQUIRED)) > CLng

  12. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  13. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  14. Green vessel scheduling in liner shipping: Modeling carbon dioxide emission costs in sea and at ports of call

    Directory of Open Access Journals (Sweden)

    Maxim A. Dulebenets

    2018-03-01

    Full Text Available Considering a substantial increase in volumes of the international seaborne trade and drastic climate changes due to carbon dioxide emissions, liner shipping companies have to improve planning of their vessel schedules and improve energy efficiency. This paper presents a novel mixed integer non-linear mathematical model for the green vessel scheduling problem, which directly accounts for the carbon dioxide emission costs in sea and at ports of call. The original non-linear model is linearized and then solved using CPLEX. A set of numerical experiments are conducted for a real-life liner shipping route to reveal managerial insights that can be of importance to liner shipping companies. Results indicate that the proposed mathematical model can serve as an efficient planning tool for liner shipping companies and may assist with evaluation of various carbon dioxide taxation schemes. Increasing carbon dioxide tax may substantially change the design of vessel schedules, incur additional route service costs, and improve the environmental sustainability. However, the effects from increasing carbon dioxide tax on the marine container terminal operations are found to be very limited.

  15. Nurse Scheduling by Cooperative GA with Effective Mutation Operator

    Science.gov (United States)

    Ohki, Makoto

    In this paper, we propose an effective mutation operators for Cooperative Genetic Algorithm (CGA) to be applied to a practical Nurse Scheduling Problem (NSP). The nurse scheduling is a very difficult task, because NSP is a complex combinatorial optimizing problem for which many requirements must be considered. In real hospitals, the schedule changes frequently. The changes of the shift schedule yields various problems, for example, a fall in the nursing level. We describe a technique of the reoptimization of the nurse schedule in response to a change. The conventional CGA is superior in ability for local search by means of its crossover operator, but often stagnates at the unfavorable situation because it is inferior to ability for global search. When the optimization stagnates for long generation cycle, a searching point, population in this case, would be caught in a wide local minimum area. To escape such local minimum area, small change in a population should be required. Based on such consideration, we propose a mutation operator activated depending on the optimization speed. When the optimization stagnates, in other words, when the optimization speed decreases, the mutation yields small changes in the population. Then the population is able to escape from a local minimum area by means of the mutation. However, this mutation operator requires two well-defined parameters. This means that user have to consider the value of these parameters carefully. To solve this problem, we propose a periodic mutation operator which has only one parameter to define itself. This simplified mutation operator is effective over a wide range of the parameter value.

  16. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results

  17. GLOA: A New Job Scheduling Algorithm for Grid Computing

    Directory of Open Access Journals (Sweden)

    Zahra Pooranian

    2013-03-01

    Full Text Available The purpose of grid computing is to produce a virtual supercomputer by using free resources available through widespread networks such as the Internet. This resource distribution, changes in resource availability, and an unreliable communication infrastructure pose a major challenge for efficient resource allocation. Because of the geographical spread of resources and their distributed management, grid scheduling is considered to be a NP-complete problem. It has been shown that evolutionary algorithms offer good performance for grid scheduling. This article uses a new evaluation (distributed algorithm inspired by the effect of leaders in social groups, the group leaders' optimization algorithm (GLOA, to solve the problem of scheduling independent tasks in a grid computing system. Simulation results comparing GLOA with several other evaluation algorithms show that GLOA produces shorter makespans.

  18. Surgical scheduling: a lean approach to process improvement.

    Science.gov (United States)

    Simon, Ross William; Canacari, Elena G

    2014-01-01

    A large teaching hospital in the northeast United States had an inefficient, paper-based process for scheduling orthopedic surgery that caused delays and contributed to site/side discrepancies. The hospital's leaders formed a team with the goals of developing a safe, effective, patient-centered, timely, efficient, and accurate orthopedic scheduling process; smoothing the schedule so that block time was allocated more evenly; and ensuring correct site/side. Under the resulting process, real-time patient information is entered into a database during the patient's preoperative visit in the surgeon's office. The team found the new process reduced the occurrence of site/side discrepancies to zero, reduced instances of changing the sequence of orthopedic procedures by 70%, and increased patient satisfaction. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  19. Adaptive Incremental Genetic Algorithm for Task Scheduling in Cloud Environments

    Directory of Open Access Journals (Sweden)

    Kairong Duan

    2018-05-01

    Full Text Available Cloud computing is a new commercial model that enables customers to acquire large amounts of virtual resources on demand. Resources including hardware and software can be delivered as services and measured by specific usage of storage, processing, bandwidth, etc. In Cloud computing, task scheduling is a process of mapping cloud tasks to Virtual Machines (VMs. When binding the tasks to VMs, the scheduling strategy has an important influence on the efficiency of datacenter and related energy consumption. Although many traditional scheduling algorithms have been applied in various platforms, they may not work efficiently due to the large number of user requests, the variety of computation resources and complexity of Cloud environment. In this paper, we tackle the task scheduling problem which aims to minimize makespan by Genetic Algorithm (GA. We propose an incremental GA which has adaptive probabilities of crossover and mutation. The mutation and crossover rates change according to generations and also vary between individuals. Large numbers of tasks are randomly generated to simulate various scales of task scheduling problem in Cloud environment. Based on the instance types of Amazon EC2, we implemented virtual machines with different computing capacity on CloudSim. We compared the performance of the adaptive incremental GA with that of Standard GA, Min-Min, Max-Min , Simulated Annealing and Artificial Bee Colony Algorithm in finding the optimal scheme. Experimental results show that the proposed algorithm can achieve feasible solutions which have acceptable makespan with less computation time.

  20. Designing a prototype of the ITER pulse scheduling system

    International Nuclear Information System (INIS)

    Yamamoto, T.; Yonekawa, I.; Ohta, K.; Hosoyama, H.; Hashimoto, Y.; Wallander, A.; Winter, A.; Sugie, T.; Kusama, Y.; Kawano, Y.; Yoshino, R.

    2012-01-01

    Highlights: ► We designed a prototype of the ITER pulse scheduling system. ► Structure of ITER pulse schedules was designed. ► Validation and automatic value assignment functions were adopted. ► A prototype will be implemented in 2011. - Abstract: A prototype of the ITER pulse scheduling system that prepares and manages parameters for ITER plasma operations has been designed. Based on the analyzed requirements on the system, structure of the parameters and necessary functions were determined. Segment and module structures were tuned to the ITER requirements. Three types of validations assure sanity of the parameters. The design limits check and the operation window check verify whether the values of the parameters do not exceed the limits. The consistency check calculates dependency among parameters in accordance with logics described in a scripting language. The ITER pulse scheduling system provides interface with a physics model and simulator. Some abstract physics parameters are converted to engineering parameters with the physics simulation. The results of simulation such as plasma characteristics of specified parameters are also shown to the researchers. The tool to specify the parameters is data-driven. Therefore, it is flexible for changes of number of the parameters. A prototype is being implemented in 2011. Using the prototype, this design will be verified and refined. The evaluation of the prototype will be a basis of the final production of the ITER pulse scheduling system.

  1. Estimating demand schedules in hedonic analysis

    DEFF Research Database (Denmark)

    Panduro, Toke Emil; Jensen, Cathrine Ulla; Lundhede, Thomas

    The hedonic pricing method has been used extensively to obtain implicit prices for availability of urban green space, but few hedonic studies have obtained households’ preference parameters. We estimate willingness to pay functions for park availability in Copenhagen using an approach that places...... identifying restrictions on the utility function. We do this for two different measures of park availability. We apply our results to a policy scenario and show how estimates of aggregate welfare changes are highly sensitive to the measure of park availability applied. Thus, the approach in this study applies...... an alternative path for estimation of demand schedules for public goods using hedonic data. The findings also stress the importance of paying attention to how public goods are defined when undertaking welfare economic policy analyses....

  2. Suggested instructions for the completion of delivery commitment schedules

    International Nuclear Information System (INIS)

    Vance, S.A.

    1992-01-01

    This presentation discusses the Delivery Commitment Schedule form contained in Appendix C of the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (the Standard Contract). In particular, the presentation describes some preliminary suggested instructions for completing the form in a manner that may aid the US Department of Energy (DOE) in the development of the Federal Waste Management System (FWMS)

  3. Medicare program; revisions to payment policies under the physician fee schedule, clinical laboratory fee schedule & other revisions to Part B for CY 2014. Final rule with comment period.

    Science.gov (United States)

    2013-12-10

    This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs. (See the Table of Contents for a listing of the specific issues addressed in the final rule with comment period.)

  4. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  5. Performance Measurement Baseline Change Request

    Data.gov (United States)

    Social Security Administration — The Performance Measurement Baseline Change Request template is used to document changes to scope, cost, schedule, or operational performance metrics for SSA's Major...

  6. Multi-flow scheduling for coordinated direct and relayed users in cellular systems

    DEFF Research Database (Denmark)

    Thai, Chan; Popovski, Petar; Kaneko, Megumi

    2013-01-01

    . Such are the Coordinated Direct/Relay (CDR) schemes, where each basic transmission involves two flows to a direct and a relayed user. Usage of MFT schemes as building blocks of more complex transmission schemes essentially changes the problem of scheduling, since some of the flows to be scheduled are coupled in a signal...

  7. Sensitivity analysis of numerical model of prestressed concrete containment

    Energy Technology Data Exchange (ETDEWEB)

    Bílý, Petr, E-mail: petr.bily@fsv.cvut.cz; Kohoutková, Alena, E-mail: akohout@fsv.cvut.cz

    2015-12-15

    Graphical abstract: - Highlights: • FEM model of prestressed concrete containment with steel liner was created. • Sensitivity analysis of changes in geometry and loads was conducted. • Steel liner and temperature effects are the most important factors. • Creep and shrinkage parameters are essential for the long time analysis. • Prestressing schedule is a key factor in the early stages. - Abstract: Safety is always the main consideration in the design of containment of nuclear power plant. However, efficiency of the design process should be also taken into consideration. Despite the advances in computational abilities in recent years, simplified analyses may be found useful for preliminary scoping or trade studies. In the paper, a study on sensitivity of finite element model of prestressed concrete containment to changes in geometry, loads and other factors is presented. Importance of steel liner, reinforcement, prestressing process, temperature changes, nonlinearity of materials as well as density of finite elements mesh is assessed in the main stages of life cycle of the containment. Although the modeling adjustments have not produced any significant changes in computation time, it was found that in some cases simplified modeling process can lead to significant reduction of work time without degradation of the results.

  8. Radiation-induced change of optical property of hydroxypropyl cellulose hydrogel containing methacrylate compounds: As a basis for development of a new type of radiation dosimeter

    International Nuclear Information System (INIS)

    Yamashita, Shinichi; Hiroki, Akihiro; Taguchi, Mitsumasa

    2014-01-01

    Hydrogels with matrix of a cellulose derivative, hydrogel of hydroxpropyl cellulose (HPC), containing two of methacrylate compounds (2-hydroxyethyl methacrylate (HEMA) and poly(ethylene glycol) dimethacrylate (9G)) were irradiated with 60 Co γ-rays. The gels become white with irradiation, and thus, could be candidates of a new type of radiation dosimeter utilized in radiation therapy because the gels become white with irradiation and can be confirmed directly by human eyes even at low doses of 1–2 Gy. Radiation-induced change of optical properties, haze value and UV–vis absorption spectrum, of the irradiated gels was measured. Dose response of the white turbidity appearance was different for different compositions of the methacrylate compounds as well as for different dose rates. The degree of the radiation-induced white turbidity was quantified by measuring haze value, showing linear dose response in low dose region (<2 Gy). We also analyzed the gels with a UV–vis spectrometer and HEMA- and 9G-rich gels gave different spectral shapes, indicating that there are at least two mechanisms leading to the white turbidity. In addition, dose rate dependence was smaller for 9G-rich gels than HEMA-rich gels in the range of 0.015–1.5 Gy/min. - Highlights: • White turbidity appeared even at 1 or 2 Gy of 60 Co γ-ray irradiation. • Haze could be used as an index of the degree of white turbidity. • UV–vis spectroscopy indicated multiple mechanisms leading to white turbidity

  9. Changes of Microbial Population in the Rumen of Dairy Steers as Influenced by Plant Containing Tannins and Saponins and Roughage to Concentrate Ratio

    Directory of Open Access Journals (Sweden)

    N. Anantasook

    2013-11-01

    Full Text Available The objective of this study was to investigate microbial population in the rumen of dairy steers as influenced by supplementing with dietary condensed tannins and saponins and different roughage to concentrate ratios. Four, rumen fistulated dairy steers (Bos indicus were used in a 2×2 factorial arrangement in a 4×4 Latin square design. The main factors were two roughage to concentrate ratios (R:C, 60:40 and 40:60 and two supplementations of rain tree pod meal (RPM (0 and 60 g/kg of total DM intake. Chopped 30 g/kg urea treated rice straw was used as a roughage source. All animals received feed according to respective R:C ratios at 25 g/kg body weight. The RPM contained crude tannins and saponins at 84 and 143 g/kg of DM, respectively. It was found that ruminal pH decreased while ruminal temperature increased by a higher concentrate ratio (R:C 40:60 (p<0.05. In contrast, total bacterial, Ruminococus albus and viable proteolytic bacteria were not affected by dietary supplementation. Numbers of fungi, cellulolytic bacteria, Fibrobactor succinogenes and Ruminococus flavefaciens were higher while amylolytic bacteria was lower when steers were fed at 400 g/kg of concentrate. The population of Fibrobactor succinogenes, was found to be higher with RPM supplementation. In addition, the use of real-time PCR technique indicated that the population of protozoa and methanogens were decreased (p<0.05 with supplementation of RPM and with an increasing concentrate ratio. Supplementation of RPM and feeding different concentrate ratios resulted in changing the rumen microbes especially, when the animals were fed at 600 g/kg of concentrate and supplemented with RPM which significantly reduced the protozoa and methanogens population.

  10. Reactor container

    International Nuclear Information System (INIS)

    Furukawa, Hideyasu; Oyamada, Osamu; Uozumi, Hiroto.

    1976-01-01

    Purpose: To provide a container for a reactor provided with a pressure suppressing chamber pool which can prevent bubble vibrating load, particularly negative pressure generated at the time of starting to release exhaust from a main steam escape-safety valve from being transmitted to a lower liner plate of the container. Constitution: This arrangement is characterized in that a safety valve exhaust pool for main steam escape, in which a pressure suppressing chamber pool is separated and intercepted from pool water in the pressure suppressing chamber pool, a safety valve exhaust pipe is open into said safety valve exhaust pool, and an isolator member, which isolates the bottom liner plate in the pressure suppressing chamber pool from the pool water, is disposed on the bottom of the safety valve exhaust pool. (Nakamura, S.)

  11. Selective Flotation of Calcite from Fluorite: A Novel Reagent Schedule

    Directory of Open Access Journals (Sweden)

    Zhiyong Gao

    2016-10-01

    Full Text Available Fluorite is an important strategic mineral. In general, fluorite ores will contain a certain amount of calcite gangue mineral. Thus, they need to be separated from each other. For an economic separation, a reverse flotation process is used to float calcite gangue from fluorite. However, little information on the separation is available. In this study, a novel reagent schedule using citric acid (CA as the depressant, sodium fluoride (NaF as the regulator and sulfoleic acid (SOA as the collector, was developed to separate calcite from fluorite. The results demonstrated a high selectivity for the flotation of calcite from fluorite using this new reagent schedule. The best selective separation for a single mineral and mixed binary minerals was obtained when 200 mg/L of NaF, 50 mg/L of CA, and 6 mg/L of SOA were used at pH 9. In addition, a batch flotation experiment was carried out using a run-of-mine feed material. Selective separation was achieved with 85.18% calcite removal while only 11.2% of fluorite was lost. An attempt was made to understand the effect of the new reagent schedule on the flotation of calcite. The results from both microflotation and bench scale flotation demonstrated a great potential for industrial application using this novel reagent schedule to upgrade fluorite ore.

  12. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  13. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  14. CONTAIN calculations

    International Nuclear Information System (INIS)

    Scholtyssek, W.

    1995-01-01

    In the first phase of a benchmark comparison, the CONTAIN code was used to calculate an assumed EPR accident 'medium-sized leak in the cold leg', especially for the first two days after initiation of the accident. The results for global characteristics compare well with those of FIPLOC, MELCOR and WAVCO calculations, if the same materials data are used as input. However, significant differences show up for local quantities such as flows through leakages. (orig.)

  15. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event is availa......CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event...... is available. The CHI'13 Interactive Schedule helps attendees navigate this wealth of video content in order to identify events they would like to attend. It consists of a number of large display screens throughout the conference venue which cycle through a video playlist of events. Attendees can interact...

  16. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  17. Reactor container

    International Nuclear Information System (INIS)

    Kato, Masami; Nishio, Masahide.

    1987-01-01

    Purpose: To prevent the rupture of the dry well even when the melted reactor core drops into a reactor pedestal cavity. Constitution: In a reactor container in which a dry well disposed above the reactor pedestal cavity for containing the reactor pressure vessel and a torus type suppression chamber for containing pressure suppression water are connected with each other, the pedestal cavity and the suppression chamber are disposed such that the flow level of the pedestal cavity is lower than the level of the pressure suppression water. Further, a pressure suppression water introduction pipeway for introducing the pressure suppression water into the reactor pedestal cavity is disposed by way of an ON-OFF valve. In case if the melted reactor core should fall into the pedestal cavity, the ON-OFF valve for the pressure suppression water introduction pipeway is opened to introduce the pressure suppression water in the suppression chamber into the pedestal cavity to cool the melted reactor core. (Ikeda, J.)

  18. Plasma container

    International Nuclear Information System (INIS)

    Ebisawa, Katsuyuki.

    1985-01-01

    Purpose: To enable to easily detect that the thickness of material to be abraded is reduced to an allowable limit from the outerside of the plasma container even during usual operation in a plasma vessel for a thermonuclear device. Constitution: A labelled material is disposed to the inside or rear face of constituent members of a plasma container undergoing the irradiation of plasma particles. A limiter plate to be abraded in the plasma container is composed of an armour member and heat removing plate, in which the armour member is made of graphite and heat-removing plate is made of copper. If the armour member is continuously abraded under the effect of sputtering due to plasma particles, silicon nitride embedded so far in the graphite at last appears on the surface of the limiter plate to undergo the impact shocks of the plasma particles. Accordingly, abrasion of the limiter material can be detected by a detector comprising gas chromatography and it can easily be detected from the outside of the plasma content even during normal operation. (Horiuchi, T.)

  19. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  20. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  1. Voltage scheduling for low power/energy

    Science.gov (United States)

    Manzak, Ali

    2001-07-01

    Power considerations have become an increasingly dominant factor in the design of both portable and desk-top systems. An effective way to reduce power consumption is to lower the supply voltage since voltage is quadratically related to power. This dissertation considers the problem of lowering the supply voltage at (i) the system level and at (ii) the behavioral level. At the system level, the voltage of the variable voltage processor is dynamically changed with the work load. Processors with limited sized buffers as well as those with very large buffers are considered. Given the task arrival times, deadline times, execution times, periods and switching activities, task scheduling algorithms that minimize energy or peak power are developed for the processors equipped with very large buffers. A relation between the operating voltages of the tasks for minimum energy/power is determined using the Lagrange multiplier method, and an iterative algorithm that utilizes this relation is developed. Experimental results show that the voltage assignment obtained by the proposed algorithm is very close (0.1% error) to that of the optimal energy assignment and the optimal peak power (1% error) assignment. Next, on-line and off-fine minimum energy task scheduling algorithms are developed for processors with limited sized buffers. These algorithms have polynomial time complexity and present optimal (off-line) and close-to-optimal (on-line) solutions. A procedure to calculate the minimum buffer size given information about the size of the task (maximum, minimum), execution time (best case, worst case) and deadlines is also presented. At the behavioral level, resources operating at multiple voltages are used to minimize power while maintaining the throughput. Such a scheme has the advantage of allowing modules on the critical paths to be assigned to the highest voltage levels (thus meeting the required timing constraints) while allowing modules on non-critical paths to be assigned

  2. Electricity usage scheduling in smart building environments using smart devices.

    Science.gov (United States)

    Lee, Eunji; Bahn, Hyokyung

    2013-01-01

    With the recent advances in smart grid technologies as well as the increasing dissemination of smart meters, the electricity usage of every moment can be detected in modern smart building environments. Thus, the utility company adopts different price of electricity at each time slot considering the peak time. This paper presents a new electricity usage scheduling algorithm for smart buildings that adopts real-time pricing of electricity. The proposed algorithm detects the change of electricity prices by making use of a smart device and changes the power mode of each electric device dynamically. Specifically, we formulate the electricity usage scheduling problem as a real-time task scheduling problem and show that it is a complex search problem that has an exponential time complexity. An efficient heuristic based on genetic algorithms is performed on a smart device to cut down the huge searching space and find a reasonable schedule within a feasible time budget. Experimental results with various building conditions show that the proposed algorithm reduces the electricity charge of a smart building by 25.6% on average and up to 33.4%.

  3. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  4. Management of Temporal Constraints for Factory Scheduling.

    Science.gov (United States)

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  5. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  6. Trustable Virtual Machine Scheduling in a Cloud

    OpenAIRE

    Hermenier , Fabien; Henrio , Ludovic

    2017-01-01

    International audience; In an Infrastructure As A Service (IaaS) cloud, the scheduler deploys VMs to servers according to service level objectives (SLOs). Clients and service providers must both trust the infrastructure. In particular they must be sure that the VM scheduler takes decisions that are consistent with its advertised behaviour. The difficulties to master every theoretical and practical aspects of a VM scheduler implementation leads however to faulty behaviours that break SLOs and ...

  7. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  8. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  9. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  10. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  11. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  12. Liner Shipping Service Scheduling with Workshift Costs

    DEFF Research Database (Denmark)

    Reinhardt, Line Blander

    while ensuring that given transit time limits for the carried cargo is satisfied, and considering the layover time for containers transshipping between services. Workshift times and cost are included ensuring that changing the port visit time will not introduce an addition cost for the port operations...

  13. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  14. 15 CFR 700.14 - Preferential scheduling.

    Science.gov (United States)

    2010-01-01

    ...) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Industrial Priorities § 700.14 Preferential scheduling. (a) A...

  15. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  16. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  17. Improved Space Surveillance Network (SSN) Scheduling using Artificial Intelligence Techniques

    Science.gov (United States)

    Stottler, D.

    There are close to 20,000 cataloged manmade objects in space, the large majority of which are not active, functioning satellites. These are tracked by phased array and mechanical radars and ground and space-based optical telescopes, collectively known as the Space Surveillance Network (SSN). A better SSN schedule of observations could, using exactly the same legacy sensor resources, improve space catalog accuracy through more complementary tracking, provide better responsiveness to real-time changes, better track small debris in low earth orbit (LEO) through efficient use of applicable sensors, efficiently track deep space (DS) frequent revisit objects, handle increased numbers of objects and new types of sensors, and take advantage of future improved communication and control to globally optimize the SSN schedule. We have developed a scheduling algorithm that takes as input the space catalog and the associated covariance matrices and produces a globally optimized schedule for each sensor site as to what objects to observe and when. This algorithm is able to schedule more observations with the same sensor resources and have those observations be more complementary, in terms of the precision with which each orbit metric is known, to produce a satellite observation schedule that, when executed, minimizes the covariances across the entire space object catalog. If used operationally, the results would be significantly increased accuracy of the space catalog with fewer lost objects with the same set of sensor resources. This approach inherently can also trade-off fewer high priority tasks against more lower-priority tasks, when there is benefit in doing so. Currently the project has completed a prototyping and feasibility study, using open source data on the SSN's sensors, that showed significant reduction in orbit metric covariances. The algorithm techniques and results will be discussed along with future directions for the research.

  18. An extended Intelligent Water Drops algorithm for workflow scheduling in cloud computing environment

    Directory of Open Access Journals (Sweden)

    Shaymaa Elsherbiny

    2018-03-01

    Full Text Available Cloud computing is emerging as a high performance computing environment with a large scale, heterogeneous collection of autonomous systems and flexible computational architecture. Many resource management methods may enhance the efficiency of the whole cloud computing system. The key part of cloud computing resource management is resource scheduling. Optimized scheduling of tasks on the cloud virtual machines is an NP-hard problem and many algorithms have been presented to solve it. The variations among these schedulers are due to the fact that the scheduling strategies of the schedulers are adapted to the changing environment and the types of tasks. The focus of this paper is on workflows scheduling in cloud computing, which is gaining a lot of attention recently because workflows have emerged as a paradigm to represent complex computing problems. We proposed a novel algorithm extending the natural-based Intelligent Water Drops (IWD algorithm that optimizes the scheduling of workflows on the cloud. The proposed algorithm is implemented and embedded within the workflows simulation toolkit and tested in different simulated cloud environments with different cost models. Our algorithm showed noticeable enhancements over the classical workflow scheduling algorithms. We made a comparison between the proposed IWD-based algorithm with other well-known scheduling algorithms, including MIN-MIN, MAX-MIN, Round Robin, FCFS, and MCT, PSO and C-PSO, where the proposed algorithm presented noticeable enhancements in the performance and cost in most situations.

  19. Composite containment for nuclear power

    International Nuclear Information System (INIS)

    Harstead, G.A.; Soeoet, O.

    1977-01-01

    Fundamentally, a nuclear reactor containment structure provides three major functions; namely, (1), to withstand loads due to pressure and temperature increase due to Design Basis Accident (DBA) (2), to withstand environmental loads such as seismic, tornado and normal loads, and (3) act as a radiation shield. Conventional design practise is to employ either a steel vessel and concrete shield building or a steel lined concrete structure. This paper deals with a new concept in which a steel liner is employed which carries much of the primary membrane loads. This type of structure is similar in some aspects to the previously described systems: a) A mat, lined with a thin plate on its top surface, is similar to concrete containment. b) A cylinder and hemispherical dome, made up of steel plate and concrete, is about 2.5 feet thick (the minimum required for radiation shielding). Although the steel plate and concrete are in contact, as in concrete containment, the steel plate in composite containment is much thicker than the liner. There are two main advantages over present practise; namely reduction of materials and therefore reduced capital cost and even more significantly a shortened construction schedule which will permit more flexibility in overall plant construction schedule and will benefit the cash flow situation. (Auth.)

  20. Peer-to-peer Cooperative Scheduling Architecture for National Grid Infrastructure

    Science.gov (United States)

    Matyska, Ludek; Ruda, Miroslav; Toth, Simon

    For some ten years, the Czech National Grid Infrastructure MetaCentrum uses a single central PBSPro installation to schedule jobs across the country. This centralized approach keeps a full track about all the clusters, providing support for jobs spanning several sites, implementation for the fair-share policy and better overall control of the grid environment. Despite a steady progress in the increased stability and resilience to intermittent very short network failures, growing number of sites and processors makes this architecture, with a single point of failure and scalability limits, obsolete. As a result, a new scheduling architecture is proposed, which relies on higher autonomy of clusters. It is based on a peer to peer network of semi-independent schedulers for each site or even cluster. Each scheduler accepts jobs for the whole infrastructure, cooperating with other schedulers on implementation of global policies like central job accounting, fair-share, or submission of jobs across several sites. The scheduling system is integrated with the Magrathea system to support scheduling of virtual clusters, including the setup of their internal network, again eventually spanning several sites. On the other hand, each scheduler is local to one of several clusters and is able to directly control and submit jobs to them even if the connection of other scheduling peers is lost. In parallel to the change of the overall architecture, the scheduling system itself is being replaced. Instead of PBSPro, chosen originally for its declared support of large scale distributed environment, the new scheduling architecture is based on the open-source Torque system. The implementation and support for the most desired properties in PBSPro and Torque are discussed and the necessary modifications to Torque to support the MetaCentrum scheduling architecture are presented, too.

  1. CONTAIN calculations; CONTAIN-Rechnungen

    Energy Technology Data Exchange (ETDEWEB)

    Scholtyssek, W.

    1995-08-01

    In the first phase of a benchmark comparison, the CONTAIN code was used to calculate an assumed EPR accident `medium-sized leak in the cold leg`, especially for the first two days after initiation of the accident. The results for global characteristics compare well with those of FIPLOC, MELCOR and WAVCO calculations, if the same materials data are used as input. However, significant differences show up for local quantities such as flows through leakages. (orig.)

  2. Reactor container

    International Nuclear Information System (INIS)

    Hidaka, Masataka; Hatamiya, Shigeo; Kawasaki, Terufumi; Fukui, Toru; Suzuki, Hiroaki; Kataoka, Yoshiyuki; Kawabe, Ryuhei; Murase, Michio; Naito, Masanori.

    1990-01-01

    In order to suppress the pressure elevation in a reactor container due to high temperature and high pressure steams jetted out upon pipeway rupture accidents in the reactor container, the steams are introduced to a pressure suppression chamber for condensating them in stored coolants. However, the ability for suppressing the pressure elevation and steam coagulation are deteriorated due to the presence of inactive incondensible gases. Then, there are disposed a vent channel for introducing the steams in a dry well to a pressure suppression chamber in the reactor pressure vessel, a closed space disposed at the position lower than a usual liquid level, a first channel having an inlet in the pressure suppression chamber and an exit in the closed space and a second means connected by way of a backflow checking means for preventing the flow directing to the closed space. The first paths are present by plurality, a portion of which constitutes a syphon. The incondensible gases and the steams are discharged to the dry well at high pressure by using the difference of the water head for a long cooling time after the pipeway rupture accident. Then, safety can be improved without using dynamic equipments as driving source. (N.H.)

  3. Assessment methodology of the summer time schedule change (CHV) in Mexico: 10 years of application; Metodologia de evaluacion del cambio de horario de verano (CHV) en Mexico: 10 anos de aplicacion

    Energy Technology Data Exchange (ETDEWEB)

    Maqueda Zamora, Martin Roberto; Perez Rebolledo, Hugo [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2008-07-01

    The Summer Time is strongly bound to the rational use of the natural resources, since it is a measure that contributes to the care of the country energy resources and the improvement of the environment. This measure consists of advancing the clock one hour in the months that have greater insolation in the country and when doing it, the electrical energy demand is reduced, a saving in the consumption of the same is obtained, resulting in a reduction of the fossil fuel consumption that is needed to generate electric energy and also the emission of polluting agents to the environment is detained. It is to emphasize that the sustainable development and the environment depend on the energy efficient use. With the application of the Summertime Schedule, the entire country participate in the care of the energy resources that are derived from their application and generates in the population a culture of the care of the energy and the environment. This program is applied to world-wide level, including the industrialized countries. In this paper the methodology implemented by the Instituto de Investigaciones Electricas (IIE) is presented, to realize the calculations of saving in electrical power consumption and the quantification of the avoided demand, as well as the main results obtained in 10 years of application of the measure in Mexico. [Spanish] El horario de verano esta fuertemente ligado al uso racional de los recursos naturales, ya que es una medida que contribuye al cuidado de los recursos energeticos del pais y la mejora del medio ambiente. Esta medida consiste en adelantar el reloj una hora en los meses que se tiene mayor insolacion en el pais y al hacerlo, se reduce la demanda de energia electrica, se tiene un ahorro en el consumo de la misma y como resultado se reduce el consumo de combustibles fosiles que se necesitan para generar la energia electrica y tambien se dejan de emitir contaminantes al medio ambiente. Cabe resaltar que el desarrollo sustentable y el

  4. 20 CFR 416.919n - Informing the medical source of examination scheduling, report content, and signature requirements.

    Science.gov (United States)

    2010-04-01

    ... scheduling, report content, and signature requirements. 416.919n Section 416.919n Employees' Benefits SOCIAL... medical source of examination scheduling, report content, and signature requirements. The medical sources... report containing all of the elements in paragraph (c). (e) Signature requirements. All consultative...

  5. 20 CFR 404.1519n - Informing the medical source of examination scheduling, report content, and signature requirements.

    Science.gov (United States)

    2010-04-01

    ... scheduling, report content, and signature requirements. 404.1519n Section 404.1519n Employees' Benefits... medical source of examination scheduling, report content, and signature requirements. The medical sources... report containing all of the elements in paragraph (c). (e) Signature requirements. All consultative...

  6. DLTAP: A Network-efficient Scheduling Method for Distributed Deep Learning Workload in Containerized Cluster Environment

    OpenAIRE

    Qiao Wei; Li Ying; Wu Zhong-Hai

    2017-01-01

    Deep neural networks (DNNs) have recently yielded strong results on a range of applications. Training these DNNs using a cluster of commodity machines is a promising approach since training is time consuming and compute-intensive. Furthermore, putting DNN tasks into containers of clusters would enable broader and easier deployment of DNN-based algorithms. Toward this end, this paper addresses the problem of scheduling DNN tasks in the containerized cluster environment. Efficiently scheduling ...

  7. Non-standard work schedules, gender, and parental stress

    Directory of Open Access Journals (Sweden)

    Mariona Lozano

    2016-02-01

    Full Text Available Background: Working non-standard hours changes the temporal structure of family life, constraining the time that family members spend with one another and threatening individuals' well-being. However, the empirical research on the link between stress and non-standard schedules has provided mixed results. Some studies have indicated that working non-standard hours is harmful whereas others have suggested that working atypical hours might facilitate the balance between family and work. Moreover, there is some evidence that the association between stress and non-standard employment has different implications for men and women. Objective: This paper examines the association between non-standard work schedules and stress among dual-earner couples with children. Two research questions are addressed. First, do predictability of the schedule and time flexibility moderate the link between non-standard work hours and stress? Second, do non-standard schedules affect men's and women's perceptions of stress differently? Methods: We use a sample of 1,932 working parents from the Canadian 2010 General Social Survey, which includes a time-use diary. A sequential logit regression analysis stratified by gender is employed to model two types of result. First, we estimate the odds of being stressed versus not being stressed. Second, for all respondents feeling stressed, we estimate the odds of experiencing high levels versus moderate levels of stress. Results: Our analysis shows that the link between non-standard working hours and perceived stress differs between mothers and fathers. First, fathers with non-standard schedules appear more likely to experience stress than those working standard hours, although the results are not significant. Among mothers, having a non-standard schedule is associated with a significantly lower risk of experiencing stress. Second, the analysis focusing on the mediating role of flexibility and predictability indicates that

  8. 75 FR 41891 - Certain Footwear: Recommendations for Modifying the Harmonized Tariff Schedule of the United States

    Science.gov (United States)

    2010-07-19

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 1205-8] Certain Footwear: Recommendations for Modifying the Harmonized Tariff Schedule of the United States AGENCY: United States International Trade Commission. ACTION: Change in date for transmitting final recommendations to the President. SUMMARY: The...

  9. Reactor container

    International Nuclear Information System (INIS)

    Oyamada, Osamu; Furukawa, Hideyasu; Uozumi, Hiroto.

    1979-01-01

    Purpose: To lower the position of an intermediate slab within a reactor container and fitting a heat insulating material to the inner wall of said intermediate slab, whereby a space for a control rod exchanging device and thermal stresses of the inner peripheral wall are lowered. Constitution: In the pedestal at the lower part of a reactor pressure vessel there is formed an intermediate slab at a position lower than diaphragm floor slab of the outer periphery of the pedestal thereby to secure a space for providing automatic exchanging device of a control rod driving device. Futhermore, a heat insulating material is fitted to the inner peripheral wall at the upper side of the intermediate slab part, and the temperature gradient in the wall thickness direction at the time of a piping rupture trouble is made gentle, and thermal stresses at the inner peripheral wall are lowered. (Sekiya, K.)

  10. Containment vessel

    International Nuclear Information System (INIS)

    Zbirohowski-Koscia, K.F.; Roberts, A.C.

    1980-01-01

    A concrete containment vessel for nuclear reactors is disclosed that is spherical and that has prestressing tendons disposed in first, second and third sets, the tendons of each set being all substantially concentric and centred around a respective one of the three orthogonal axes of the sphere; the tendons of the first set being anchored at each end at a first anchor rib running around a circumference of the vessel, the tendons of the second set being anchored at each end at a second anchor rib running around a circumference of the sphere and disposed at 90 0 to the first rib, and the tendons of the third set being anchored some to the first rib and the remainder to the second rib. (author)

  11. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  12. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  13. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  14. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  15. A dynamic approach to vehicle scheduling

    NARCIS (Netherlands)

    D. Huisman (Dennis); R. Freling (Richard); A.P.M. Wagelmans (Albert)

    2001-01-01

    textabstractThis paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our

  16. State Teacher Salary Schedules. Policy Analysis

    Science.gov (United States)

    Griffith, Michael

    2016-01-01

    In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…

  17. Evolutionary Scheduler for the Deep Space Network

    Science.gov (United States)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  18. Decay-usage scheduling in multiprocessors

    NARCIS (Netherlands)

    Epema, D.H.J.

    1998-01-01

    Decay-usage scheduling is a priority-aging time-sharing scheduling policy capable of dealing with a workload of both interactive and batch jobs by decreasing the priority of a job when it acquires CPU time, and by increasing its priority when it does not use the (a) CPU. In this article we deal with

  19. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  20. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... domestic law and international conventions and agreements adopted by the United States; such terminal... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  1. 21 CFR 1308.13 - Schedule III.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III. 1308.13 Section 1308.13 Food and... opposite it. (b) Stimulants. Unless specifically excepted or unless listed in another schedule, any... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical...

  2. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  3. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  4. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction and Schedule After nearly seven months of concentrated effort, the installation of services on YB0 moved off the CMS critical path in late November. In line with v36 planning provisions, the additional time needed to finish this challeng¬ing task was accommodated by reducing sequential dependencies between assembly tasks, putting more tasks (especially heavy logistic movements) in parallel with activities on, or within, the central wheel. Thus the lowering of wheels YB-1 and YB -2 and of disk YE-3 is already complete, the latter made possible, in the shadow of YB0 work, by inverting the order of the 3 endcap disks in the surface building. Weather conditions permitting, the Tracker will be transported to point 5 during CMS week for insertion in EB before CERN closes. The lowering of the last two disks will take place mid- and end-of January, respectively. Thus central beampipe installation can be confidently planned to start in February as foreseen, allowing closure of CMS in time for CRA...

  5. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  6. Scheduling mammograms for asymptomatic women

    International Nuclear Information System (INIS)

    Gohagan, J.K.; Darby, W.P.; Spitznagel, E.L.; Tome, A.E.

    1988-01-01

    A decision theoretic model was used to investigate the relative importance of risk level, radiation hazard, mammographic accuracy, and cost in mammographic screening decision. The model uses woman-specific medical and family history facts and clinic-specific information regarding mammographic accuracy and practice to profile both woman and clinic, and to formulate periodic screening recommendations. Model parameters were varied extensively to investigate the sensitivity of screening schedules to input values. Multivariate risk was estimated within the program using published data from the Breast Cancer Detection Demonstration Project 5-year follow-up study. Radiation hazard estimates were developed from published radiation physics and radioepidemiologic risk data. Benchmark values for mammographic sensitivity and specificity under screening conditions were calculated from Breast Cancer Detection Demonstration Project data. Procedural costs used in the analysis were varied around values reflecting conditions at the Washington University Medical Center. Mortality advantages of early versus late breast cancer detection were accounted for using Health Insurance Plan of New York case survival rates. Results are compared with published screening policies to provide insight into implicit assumptions behind those policies. This analysis emphasizes the importance of accounting for variations in clinical accuracy under screening circumstances, in costs, in radiation exposure, and in woman-specific risk when recommending mammographic screening

  7. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Since the lowering of YB0 in February, less spectacular but nonetheless crucial progress has been made along the critical path to CMS completion. The YB0 has been aligned with the beamline to a fraction of a mm, and the HCAL has been fully installed. Cabling scaffolding for YB0 services has been built and one half (-z end) of the ECAL barrel has been installed. The YB0 services installation has begun, with two of the major technical challenges delaying bulk installation, namely PP1 detailed design, manufacture and installation plus Tracker cooling pipe insulation, now apparently solved. Significant difficulties in detailed design, integration and procurement of cable ducts remain. Despite this, the design of the +end is close to complete, and Tracker power cable installation on two sectors of the +end is well advanced. A new master schedule, v36.0, is being prepared to account for the updated actual situation at point 5 and for the revised LHC machine planning. Safety The enormous amount of...

  8. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  9. Using Optimization Models for Scheduling in Enterprise Resource Planning Systems

    Directory of Open Access Journals (Sweden)

    Frank Herrmann

    2016-03-01

    Full Text Available Companies often use specially-designed production systems and change them from time to time. They produce small batches in order to satisfy specific demands with the least tardiness. This imposes high demands on high-performance scheduling algorithms which can be rapidly adapted to changes in the production system. As a solution, this paper proposes a generic approach: solutions were obtained using a widely-used commercially-available tool for solving linear optimization models, which is available in an Enterprise Resource Planning System (in the SAP system for example or can be connected to it. In a real-world application of a flow shop with special restrictions this approach is successfully used on a standard personal computer. Thus, the main implication is that optimal scheduling with a commercially-available tool, incorporated in an Enterprise Resource Planning System, may be the best approach.

  10. Application of Tabu Search Algorithm in Job Shop Scheduling

    Directory of Open Access Journals (Sweden)

    Betrianis Betrianis

    2010-10-01

    Full Text Available Tabu Search is one of local search methods which is used to solve the combinatorial optimization problem. This method aimed is to make the searching process of the best solution in a complex combinatorial optimization problem(np hard, ex : job shop scheduling problem, became more effective, in a less computational time but with no guarantee to optimum solution.In this paper, tabu search is used to solve the job shop scheduling problem consists of 3 (three cases, which is ordering package of September, October and November with objective of minimizing makespan (Cmax. For each ordering package, there is a combination for initial solution and tabu list length. These result then  compared with 4 (four other methods using basic dispatching rules such as Shortest Processing Time (SPT, Earliest Due Date (EDD, Most Work Remaining (MWKR dan First Come First Served (FCFS. Scheduling used Tabu Search Algorithm is sensitive for variables changes and gives makespan shorter than scheduling used by other four methods.

  11. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Science.gov (United States)

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  12. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Directory of Open Access Journals (Sweden)

    Jinxiang Dong

    2008-07-01

    Full Text Available There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting crosslayer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An eventdriven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN.

  13. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  14. Simulation of less master production schedule nervousness model

    OpenAIRE

    Herrera , Carlos; Thomas , André

    2009-01-01

    International audience; In production decision making systems, Master Production Schedule (MPS) states the requirements for individual end items by date and quantity. The solution sensitivity to demand forecast changes, unforeseen supplier and production problem occurrences, is known as nervousness. This feature cause undesirable effects at tactical and operational levels. Some of these effects are production and inventory cost increases and, also, negative impacts on overall and labor produc...

  15. Schedule-dependency of doxorubicin and vinblastine in EAT tumours in mice

    International Nuclear Information System (INIS)

    Auersperg, M.; Pogacnik, A.; Kloboves-Prevodnik, V.; Sersa, G.; Cemazar, M.

    2006-01-01

    Background. Antitumour schedule-dependency of the doxorubicin and vinblastine combination was explored. Materials and methods. Intraperitoneal Ehrlich ascites tumours (EAT) syngeneic to CBA mice were treated with vinblastine or doxorubicin alone, or in combined treatment schedules. Results. Combinations of doxorubicin and vinblastine administered at 48-h, but not at 24-h interval, regardless of the sequence of drugs, significantly reduced the number of tumour cells in the ascites in comparison with all other treatments. In the combined treatment schedules, the predominant morphological changes as well as DNA distribution pattern were dependent on the first drug applied. Regardless of the sequence of the drugs, median survival times of animals did not significantly differ between the treatment groups. Conclusions. The effect of combination of vinblastine and doxorubicin is schedule-dependent. The time interval, but not the sequence of drugs seems to be crucial for the observed effect. The data from preclinical studies are important for planning combined treatment schedules in clinical setting. (author)

  16. Investigating the Effect of Voltage-Switching on Low-Energy Task Scheduling in Hard Real-Time Systems

    National Research Council Canada - National Science Library

    Swaminathan, Vishnu; Chakrabarty, Krishnendu

    2005-01-01

    We investigate the effect of voltage-switching on task execution times and energy consumption for dual-speed hard real-time systems, and present a new approach for scheduling workloads containing periodic tasks...

  17. NASA: Changes to the scope, schedule, and estimated cost of the Earth Observing System. Report to the Chair, Government Activities and Transportation Subcommittee, Committee on Government Operations, House of Representatives

    International Nuclear Information System (INIS)

    1992-07-01

    Congress funded the Earth Observing System (EOS) as a new NASA program beginning in fiscal year 1991. NASA proposed to launch about 30 types of earth observing instruments beginning in 1998. These instruments were intended to improve satellite data about the earth and to provide new data to support interdisciplinary studies of the earth. EOS is seen by NASA as the first step toward a future period of space-based scientific observation of the earth. The program is directly linked to the objectives of the U.S. Global Change Research Program and international efforts to observe and study the earth. The U.S. Global Change Research Program, which is funded by 11 agencies, is an attempt to achieve these objectives and to improve predictions of climate and other forms of global change. Within that program, EOS is intended to significantly improve scientists' abilities to model, and thereby predict, broad natural relationships among the sea, land, and atmosphere; to observe how water, carbon, and other substances move on the planet or are affected by variations in the sun's radiation; and to assess the impact of human activities on the earth's climate. Ultimately, EOS is to help determine the extent to which human activities are affecting the earth's environment and to provide policymakers with the information they will need to preserve the earth

  18. EPR characterization of the mononuclear Cu-containing Aspergillus japonicus quercetin 2,3-dioxygenase reveals dramatic changes upon anaerobic binding of substrates

    NARCIS (Netherlands)

    Kooter, Ingeborg M.; Steiner, Roberto A.; Dijkstra, Bauke W.; Noort, Paula I. van; Egmond, Maarten R.; Huber, Martina

    Quercetin 2,3-dioxygenase (2,3QD) is a copper-containing dioxygenase that catalyses the oxidation of the flavonol quercetin to 2-protocatechuoylphloroglucinol carboxylic acid with concomitant production of carbon monoxide. In contrast to iron dioxygenases, very little is known about copper

  19. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  20. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  1. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  2. Scheduling multimedia services in cloud computing environment

    Science.gov (United States)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  3. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  4. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  5. Optimal load scheduling in commercial and residential microgrids

    Science.gov (United States)

    Ganji Tanha, Mohammad Mahdi

    Residential and commercial electricity customers use more than two third of the total energy consumed in the United States, representing a significant resource of demand response. Price-based demand response, which is in response to changes in electricity prices, represents the adjustments in load through optimal load scheduling (OLS). In this study, an efficient model for OLS is developed for residential and commercial microgrids which include aggregated loads in single-units and communal loads. Single unit loads which include fixed, adjustable and shiftable loads are controllable by the unit occupants. Communal loads which include pool pumps, elevators and central heating/cooling systems are shared among the units. In order to optimally schedule residential and commercial loads, a community-based optimal load scheduling (CBOLS) is proposed in this thesis. The CBOLS schedule considers hourly market prices, occupants' comfort level, and microgrid operation constraints. The CBOLS' objective in residential and commercial microgrids is the constrained minimization of the total cost of supplying the aggregator load, defined as the microgrid load minus the microgrid generation. This problem is represented by a large-scale mixed-integer optimization for supplying single-unit and communal loads. The Lagrangian relaxation methodology is used to relax the linking communal load constraint and decompose the independent single-unit functions into subproblems which can be solved in parallel. The optimal solution is acceptable if the aggregator load limit and the duality gap are within the bounds. If any of the proposed criteria is not satisfied, the Lagrangian multiplier will be updated and a new optimal load schedule will be regenerated until both constraints are satisfied. The proposed method is applied to several case studies and the results are presented for the Galvin Center load on the 16th floor of the IIT Tower in Chicago.

  6. Influences on cocaine tolerance assessed under a multiple conjunctive schedule of reinforcement.

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N

    2009-11-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the effects of cocaine on key-pecking responses of White Carneau pigeons maintained under a three-component multiple conjunctive FI (10 s, 30 s, & 120 s) FR (5 responses) schedule of food presentation. Dose-effect curves representing the effects of presession cocaine on responding were assessed in the context of (1) acute administration of cocaine (2) chronic administration of cocaine and (3) daily administration of saline. Chronic administration of cocaine generally resulted in tolerance to the response-rate decreasing effects of cocaine, and that tolerance was generally independent of relative FI value, as measured by changes in ED50 values. Daily administration of saline decreased ED50 values to those observed when cocaine was administered acutely. The results show that adding a FR requirement to FI schedules is not sufficient to produce schedule-parameter-specific tolerance. Tolerance to cocaine was generally independent of FI-parameter under the present conjunctive schedules, indicating that a ratio requirement, per se, is not sufficient for tolerance to be dependent on FI parameter.

  7. An Improved Genetic Algorithm for Single-Machine Inverse Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Jianhui Mou

    2014-01-01

    Full Text Available The goal of the scheduling is to arrange operations on suitable machines with optimal sequence for corresponding objectives. In order to meet market requirements, scheduling systems must own enough flexibility against uncertain events. These events can change production status or processing parameters, even causing the original schedule to no longer be optimal or even to be infeasible. Traditional scheduling strategies, however, cannot cope with these cases. Therefore, a new idea of scheduling called inverse scheduling has been proposed. In this paper, the inverse scheduling with weighted completion time (SMISP is considered in a single-machine shop environment. In this paper, an improved genetic algorithm (IGA with a local searching strategy is proposed. To improve the performance of IGA, efficient encoding scheme, fitness evaluation mechanism, feasible initialization methods, and a local search procedure have been employed in the paper. Because of the local improving method, the proposed IGA can balance its exploration ability and exploitation ability. We adopt 27 instances to verify the effectiveness of the proposed algorithm. The experimental results illustrated that the proposed algorithm can generate satisfactory solutions. This approach also has been applied to solve the scheduling problem in the real Chinese shipyard and can bring some benefits.

  8. Data-oriented scheduling for PROOF

    International Nuclear Information System (INIS)

    Xu Neng; Guan Wen; Wu Sau Lan; Ganis, Gerardo

    2011-01-01

    The Parallel ROOT Facility - PROOF - is a distributed analysis system optimized for I/O intensive analysis tasks of HEP data. With LHC entering the analysis phase, PROOF has become a natural ingredient for computing farms at Tier3 level. These analysis facilities will typically be used by a few tenths of users, and can also be federated into a sort of analysis cloud corresponding to the Virtual Organization of the experiment. Proper scheduling is required to guarantee fair resource usage, to enforce priority policies and to optimize the throughput. In this paper we discuss an advanced priority system that we are developing for PROOF. The system has been designed to automatically adapt to unknown length of the tasks, to take into account the data location and availability (including distribution across geographically separated sites), and the {group, user} default priorities. In this system, every element - user, group, dataset, job slot and storage - gets its priority and those priorities are dynamically linked with each other. In order to tune the interplay between the various components, we have designed and started implementing a simulation application that can model various type and size of PROOF clusters. In this application a monitoring package records all the changes of them so that we can easily understand and tune the performance. We will discuss the status of our simulation and show examples of the results we are expecting from it.

  9. Maternal methadone dosing schedule and fetal neurobehavior

    Science.gov (United States)

    Jansson, Lauren M.; DiPietro, Janet A.; Velez, Martha; Elko, Andrea; Knauer, Heather; Kivlighan, Katie T.

    2008-01-01

    Objective Daily methadone maintenance is the standard of care for opiate dependency during pregnancy. Previous research has indicated that single-dose maternal methadone administration significantly suppresses fetal neurobehaviors. The purpose of this study was to determine if split-dosing would have less impact on fetal neurobehavior than single-dose administration. Methods Forty methadone-maintained women were evaluated at peak and trough maternal methadone levels on single- and split-dosing schedules. Monitoring sessions occurred at 36 and 37 weeks gestation in a counterbalanced study design. Fetal measures included heart rate, variability, accelerations, motor activity and fetal movement-heart rate coupling (FM-FHR). Maternal measures included heart period, variability, skin conductance, respiration and vagal tone. Repeated measure analysis of variance was used to evaluate within-subject changes between split- and single-dosing regimens. Results All fetal neurobehavioral parameters were suppressed by maternal methadone administration, regardless of dosing regimen. Fetal parameters at peak were significantly lower during single vs. split methadone administration. FM-FHR coupling was less suppressed from trough to peak during split-dosing vs. single-dosing. Maternal physiologic parameters were generally unaffected by dosing condition. Conclusion Split- dosed fetuses displayed less neurobehavioral suppression from trough to peak maternal methadone levels as compared to single-dosed fetuses. Split-dosing may be beneficial for methadone-maintained pregnant women. PMID:19085624

  10. Bridging the Gap Between Planning and Scheduling

    Science.gov (United States)

    Smith, David E.; Frank, Jeremy; Jonsson, Ari K.; Norvig, Peter (Technical Monitor)

    2000-01-01

    Planning research in Artificial Intelligence (AI) has often focused on problems where there are cascading levels of action choice and complex interactions between actions. In contrast. Scheduling research has focused on much larger problems where there is little action choice, but the resulting ordering problem is hard. In this paper, we give an overview of M planning and scheduling techniques, focusing on their similarities, differences, and limitations. We also argue that many difficult practical problems lie somewhere between planning and scheduling, and that neither area has the right set of tools for solving these vexing problems.

  11. Sleep schedules and school performance in Indigenous Australian children.

    Science.gov (United States)

    Blunden, Sarah; Magee, Chris; Attard, Kelly; Clarkson, Larissa; Caputi, Peter; Skinner, Timothy

    2018-04-01

    Sleep duration and sleep schedule variability have been related to negative health and well-being outcomes in children, but little is known about Australian Indigenous children. Data for children aged 7-9 years came from the Australian Longitudinal Study of Indigenous Children and the National Assessment Program-Literacy and Numeracy (NAPLAN). Latent class analysis determined sleep classes taking into account sleep duration, bedtimes, waketimes, and variability in bedtimes from weekdays to weekends. Regression models tested whether the sleep classes were cross-sectionally associated with grade 3 NAPLAN scores. Latent change score modeling then examined whether the sleep classes predicted changes in NAPLAN performance from grades 3 to 5. Five sleep schedule classes were identified: normative sleep, early risers, long sleep, variable sleep, and short sleep. Overall, long sleepers performed best, with those with reduced sleep (short sleepers and early risers) performing the worse on grammar, numeracy, and writing performance. Latent change score results also showed that long sleepers performed best in spelling and writing and short sleepers and typical sleepers performed the worst over time. In this sample of Australian Indigenous children, short sleep was associated with poorer school performance compared with long sleep, with this performance worsening over time for some performance indicators. Other sleep schedules (eg, early wake times and variable sleep) also had some relationships with school performance. As sleep scheduling is modifiable, this offers opportunity for improvement in sleep and thus performance outcomes for these and potentially all children. Copyright © 2018 National Sleep Foundation. Published by Elsevier Inc. All rights reserved.

  12. Parallel Machine Scheduling with Batch Delivery to Two Customers

    Directory of Open Access Journals (Sweden)

    Xueling Zhong

    2015-01-01

    Full Text Available In some make-to-order supply chains, the manufacturer needs to process and deliver products for customers at different locations. To coordinate production and distribution operations at the detailed scheduling level, we study a parallel machine scheduling model with batch delivery to two customers by vehicle routing method. In this model, the supply chain consists of a processing facility with m parallel machines and two customers. A set of jobs containing n1 jobs from customer 1 and n2 jobs from customer 2 are first processed in the processing facility and then delivered to the customers directly without intermediate inventory. The problem is to find a joint schedule of production and distribution such that the tradeoff between maximum arrival time of the jobs and total distribution cost is minimized. The distribution cost of a delivery shipment consists of a fixed charge and a variable cost proportional to the total distance of the route taken by the shipment. We provide polynomial time heuristics with worst-case performance analysis for the problem. If m=2 and (n1-b(n2-b<0, we propose a heuristic with worst-case ratio bound of 3/2, where b is the capacity of the delivery shipment. Otherwise, the worst-case ratio bound of the heuristic we propose is 2-2/(m+1.

  13. Secondary Containers and Service Containers for Pesticides

    Science.gov (United States)

    Secondary containers and service containers are used by pesticide applicators in the process of applying a pesticide. EPA does not require secondary containers or service containers to be labeled or to meet particular construction standards. Learn more.

  14. Tramp Ship Routing and Scheduling - Incorporating Additional Complexities

    DEFF Research Database (Denmark)

    Vilhelmsen, Charlotte

    to mergers, pooling, and collaboration efforts between shipping companies, the fleet sizes have grown to a point where manual planning is no longer adequate in a market with tough competition and low freight rates. This thesis therefore aims at developing new mathematical models and solution methods...... for tramp ship routing and scheduling problems. This is done in the context of Operations Research, a research field that has achieved great success within optimisation-based planning for vehicle routing problems and in many other areas. The first part of this thesis contains a comprehensive introduction...

  15. A note on a model for quay crane scheduling with non-crossing constraints

    DEFF Research Database (Denmark)

    Santini, Alberto; Friberg, Henrik Alsing; Røpke, Stefan

    2015-01-01

    This article studies the quay crane scheduling problem with non-crossing constraints, which is an operational problem that arises in container terminals. An enhancement to a mixed integer programming model for the problem is proposed and a new class of valid inequalities is introduced. Computatio......This article studies the quay crane scheduling problem with non-crossing constraints, which is an operational problem that arises in container terminals. An enhancement to a mixed integer programming model for the problem is proposed and a new class of valid inequalities is introduced...

  16. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  17. Quantify Risk to Manage Cost and Schedule

    National Research Council Canada - National Science Library

    Raymond, Fred

    1999-01-01

    Too many projects suffer from unachievable budget and schedule goals, caused by unrealistic estimates and the failure to quantify and communicate the uncertainty of these estimates to managers and sponsoring executives...

  18. Alternative Work Schedules Increase Employee Satisfaction.

    Science.gov (United States)

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  19. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  20. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    . In this paper, we propose a novel nonblocking scheduling mechanism that is used prior to the actual service invocations. Its aim is to reach an agreement between the client and all participating providers on what transaction processing times have to be expected, accepted, and guaranteed. This enables service......For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...... schedulers of service providers typically do take into account neither time constraints for committing the whole transaction, nor the individual services' constraints when scheduling decisions are made. This often leads to an unnecessary blocking of transactions by (possibly long-running) others...

  1. Schedule Sales Query Report Generation System

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  2. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  3. Congruent Validity of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Harris, Thomas L.; Brown, Nina W.

    1979-01-01

    The validity of the Rathus Assertiveness Schedule (RAS) was investigated by correlating it with the six Class I scales of the California Psychological Inventory on a sample of undergraduate students. Results supported the validity of the RAS. (JKS)

  4. Job shop scheduling by local search

    NARCIS (Netherlands)

    Aarts, E.H.L.; Lenstra, J.K.; Laarhoven, van P.J.M.; Ulder, N.L.J.

    1992-01-01

    We present a computational performance analysis of local search algorithms for job shop scheduling. The algorithms under investigation are iterative improvement, simulated annealing, threshold accepting and genetic local search. Our study shows that simulated annealing performs best in the sense

  5. Scheduling job shop - A case study

    Science.gov (United States)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  6. Job scheduling in a heterogenous grid environment

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  7. The School Schedule--Servant or Mistress?

    Science.gov (United States)

    Holmes, Mark

    1984-01-01

    Pointing out that time is a dimension of school wealth, the author explores its use in school schedules. Administrators need to be aware of the relationship between time allocation and learning consequences. (MD)

  8. Economic and psychological burden of scheduled surgery ...

    African Journals Online (AJOL)

    Background: Cancellation of scheduled surgery creates a financial burden for hospitals, caregivers and ..... costs and disregard some of the aspects mentioned in the ..... cancellation of elective surgical procedures in a Spanish general.

  9. Onboard Autonomous Scheduling Intelligence System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Scheduling the daily activities of the crew on a human space mission is currently a cumbersome job performed by a large team of operations experts on the ground....

  10. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  11. Courts, Scheduled Damages, and Medical Malpractice Insurance

    DEFF Research Database (Denmark)

    Bertoli, Paola; Grembi, Veronica

    We assess the impact of the introduction of schedules of non-economic damages (i.e. tiered caps systems) on the behavior of insurers operating in the medical liability market for hospitals while controlling the performance of the judicial system, measured as court backlog. Using a difference......-in-differences strategy on Italian data, we find that the introduction of schedules increases the presence of insurers (i.e. medical liability market attractiveness) only in inefficient judicial districts. In the same way, court inefficiency is attractive to insurers for average values of schedules penetration...... of the market, with an increasing positive impact of inefficiency as the territorial coverage of schedules increases. Finally, no significant impact is registered on paid premiums. Our analysis sheds light on a complex set of elements affecting the decisions of insurers in malpractice markets. The analysis...

  12. 76 FR 18262 - January 2011 Pay Schedules

    Science.gov (United States)

    2011-04-01

    ... an OPM memorandum, CPM 2009-27. (See http://www.opm.gov/oca/compmemo/index.asp .) Executive Order... Schedule ($165,300 in 2011, the same level as in 2010). On December 27, 2010, OPM issued a memorandum (CPM...

  13. Containment for small pressurized water reactors

    International Nuclear Information System (INIS)

    Siler, W.C.; Marda, R.S.; Smith, W.R.

    1977-01-01

    Babcock and Wilcox Company has prepared studies under ERDA contract of small and intermediate size (313, 365 and 1200 MWt) PWR reactor plants, for industrial cogeneration or electric power generation. Studies and experience with nuclear plants in this size range indicate unfavorable economics. To offset this disadvantage, modular characteristics of an integral reactor and close-coupled vapor suppression containment have been exploited to shorten construction schedules and reduce construction costs. The resulting compact reactor/containment complex is illustrated. Economic studies to date indicate that the containment design and the innovative construction techniques developed to shorten erection schedules have been important factors in reducing estimated project costs, thus potentially making such smaller plants competetive with competing energy sources

  14. Heuristic Approach for Balancing Shift Schedules

    International Nuclear Information System (INIS)

    Kim, Dae Ho; Yun, Young Su; Lee, Yong Hee

    2005-01-01

    In this paper, a heuristic approach for balancing shift schedules is proposed. For the shift schedules, various constraints which have usually been considered in realworld industry are used, and the objective is to minimize the differences of the workloads in each workgroup. The constraints and objective function are implemented in the proposed heuristic approach. Using a simple instance, the efficiency of the proposed heuristic approach is proved

  15. Algorithms for classical and modern scheduling problems

    OpenAIRE

    Ott, Sebastian

    2016-01-01

    Subject of this thesis is the design and the analysis of algorithms for scheduling problems. In the first part, we focus on energy-efficient scheduling, where one seeks to minimize the energy needed for processing certain jobs via dynamic adjustments of the processing speed (speed scaling). We consider variations and extensions of the standard model introduced by Yao, Demers, and Shenker in 1995 [79], including the addition of a sleep state, the avoidance of preemption, and variable speed lim...

  16. Maritime wideband communication networks video transmission scheduling

    CERN Document Server

    Yang, Tingting

    2014-01-01

    This Springer Brief covers emerging maritime wideband communication networks and how they facilitate applications such as maritime distress, urgency, safety and general communications. It provides valuable insight on the data transmission scheduling and protocol design for the maritime wideband network. This brief begins with an introduction to maritime wideband communication networks including the architecture, framework, operations and a comprehensive survey on current developments. The second part of the brief presents the resource allocation and scheduling for video packet transmission wit

  17. Lift scheduling organization : Lift Concept for Lemminkainen

    OpenAIRE

    Mingalimov, Iurii

    2015-01-01

    The purpose of the work was to make a simple schedule for the main contractors and clients to check and control workflow connected with lifts. It gathers works with electricity, construction, engineering networks, installing equipment and commissioning works. The schedule was carried out during working on the building site Aino in Saint Petersburg in Lemminkӓinen. The duration of work was 5 months. The lift concept in Lemminkӓinen is very well controlled in comparison with other buil...

  18. Revised data taking schedule with ion beams

    CERN Document Server

    Gazdzicki, Marek; Aduszkiewicz, A; Andrieu, B; Anticic, T; Antoniou, N; Argyriades, J; Asryan, A G; Baatar, B; Blondel, A; Blumer, J; Boldizsar, L; Bravar, A; Brzychczyk, J; Bubak, A; Bunyatov, S A; Choi, K U; Christakoglou, P; Chung, P; Cleymans, J; Derkach, D A; Diakonos, F; Dominik, W; Dumarchez, J; Engel, R; Ereditato, A; Feofilov, G A; Fodor, Z; Ferrero, A; Gazdzicki, M; Golubeva, M; Grebieszkow, K; Grzeszczuk, A; Guber, F; Hasegawa, T; Haungs, A; Igolkin, S; Ivanov, A S; Ivashkin, A; Kadija, K; Katrynska, N; Kielczewska, D; Kikola, D; Kisiel, J; Kobayashi, T; Kolesnikov, V I; Kolev, D; Kolevatov, R S; Kondratiev, V P; Kowalski, S; Kurepin, A; Lacey, R; Laszlo, A; Lyubushkin, V V; Majka, Z; I Malakhov, A; Marchionni, A; Marcinek, A; Maris, I; Matveev, V; Melkumov, G L; Meregaglia, A; Messina, M; Mijakowski, P; Mitrovski, M; Montaruli, T; Mrówczynski, St; Murphy, S; Nakadaira, T; Naumenko, P A; Nikolic, V; Nishikawa, K; Palczewski, T; Pálla, G; Panagiotou, A D; Peryt, W; Planeta, R; Pluta, J; Popov, B A; Posiadala, M; Przewlocki, P; Rauch, W; Ravonel, M; Renfordt, R; Röhrich, D; Rondio, E; Rossi, B; Roth, M; Rubbia, A; Rybczynski, M; Sadovskii, A; Sakashita, K; Schuster, T; Sekiguchi, T; Seyboth, P; Shibata, M; Sissakian, A N; Skrzypczak, E; Slodkowski, M; Sorin, A S; Staszel, P; Stefanek, G; Stepaniak, J; Strabel, C; Ströbele, H; Susa, T; Szentpétery, I; Szuba, M; Tada, M; Taranenko, A; Tsenov, R; Ulrich, R; Unger, M; Vassiliou, M; Vechernin, V V; Vesztergombi, G; Wlodarczyk, Z; Wojtaszek, A; Zipper, W; CERN. Geneva. SPS and PS Experiments Committee; SPSC

    2009-01-01

    This document presents the revised data taking schedule of NA61 with ion beams. The revision takes into account limitations due to the new LHC schedule as well as final results concerning the physics performance with secondary ion beams. It is proposed to take data with primary Ar and Xe beams in 2012 and 2014, respectively, and to test and use for physics a secondary B beam from primary Pb beam fragmentation in 2010, 2011 and 2013.

  19. Job schedul in Grid batch farms

    International Nuclear Information System (INIS)

    Gellrich, Andreas

    2014-01-01

    We present here a study for a scheduler which cooperates with the queueing system TORQUE and is tailored to the needs of a HEP-dominated large Grid site with around 10000 jobs slots. Triggered by severe scaling problems of MAUI, a scheduler, referred to as MYSCHED, was developed and put into operation. We discuss conceptional aspects as well as experiences after almost two years of running.

  20. Scheduling Diet for Diabetes Mellitus Patients using Genetic Algorithm

    Science.gov (United States)

    Syahputra, M. F.; Felicia, V.; Rahmat, R. F.; Budiarto, R.

    2017-01-01

    Diabetes Melitus (DM) is one of metabolic diseases which affects on productivity and lowers the human resources quality. This disease can be controlled by maintaining and regulating balanced and healthy lifestyle especially for daily diet. However, nowadays, there is no system able to help DM patient to get any information of proper diet. Therefore, an approach is required to provide scheduling diet every day in a week with appropriate nutrition for DM patients to help them regulate their daily diet for healing this disease. In this research, we calculate the number of caloric needs using Harris-Benedict equation and propose genetic algorithm for scheduling diet for DM patient. The results show that the greater the number of individuals, the greater the more the possibility of changes in fitness score approaches the best fitness score. Moreover, the greater the created generation, the more the opportunites to obtain best individual with fitness score approaching 0 or equal to 0.