WorldWideScience

Sample records for scandium 48

  1. Scandium recovery from slags after oxidized nickel ore processing

    Science.gov (United States)

    Smyshlyaev, Denis; Botalov, Maxim; Bunkov, Grigory; Rychkov, Vladimir; Kirillov, Evgeny; Kirillov, Sergey; Semenishchev, Vladimir

    2017-09-01

    One of the possible sources of scandium production - waste (slags) from processing of oxidized nickel ores, has been considered in present research work. The hydrometallurgical method has been selected as the primary for scandium extraction. Different reagents for leaching of scandium, such as sulfuric acid, various carbonate salts and fluorides, have been tested. Sulfuric acid has been recognized as an optimal leaching reagent. Sulfuric acid concentration of 100 g L-1 allowed recovering up to 97 % of scandium.

  2. Influence of scandium concentration on power generation figure of merit of scandium aluminum nitride thin films

    Energy Technology Data Exchange (ETDEWEB)

    Akiyama, Morito; Nagase, Toshimi [Measurement Solution Research Center, National Institute of Advanced Industrials Science and Technology, Tosu, Saga 841-0052 (Japan); Umeda, Keiichi; Honda, Atsushi [Murata Manufacturing Co., Ltd., Nagaokakyo, Kyoto 617-8555 (Japan)

    2013-01-14

    The authors have investigated the influence of scandium concentration on the power generation figure of merit (FOM) of scandium aluminum nitride (Sc{sub x}Al{sub 1-x}N) films prepared by cosputtering. The power generation FOM strongly depends on the scandium concentration. The FOM of Sc{sub 0.41}Al{sub 0.59}N film was 67 GPa, indicating that the FOM is five times larger than that of AlN. The FOM of Sc{sub 0.41}Al{sub 0.59}N film is higher than those of lead zirconate titanate and Pb(Mg{sub 1/3}Nb{sub 2/3})O{sub 3}-PbTiO{sub 3} films, which is the highest reported for any piezoelectric thin films. The high FOM of Sc{sub 0.41}Al{sub 0.59}N film is due to the high d{sub 31} and the low relative permittivity.

  3. Lifetime measurements and oscillator strengths in singly ionized scandium and the solar abundance of scandium

    Science.gov (United States)

    Pehlivan Rhodin, A.; Belmonte, M. T.; Engström, L.; Lundberg, H.; Nilsson, H.; Hartman, H.; Pickering, J. C.; Clear, C.; Quinet, P.; Fivet, V.; Palmeri, P.

    2017-12-01

    The lifetimes of 17 even-parity levels (3d5s, 3d4d, 3d6s and 4p2) in the region 57 743-77 837 cm-1 of singly ionized scandium (Sc II) were measured by two-step time-resolved laser induced fluorescence spectroscopy. Oscillator strengths of 57 lines from these highly excited upper levels were derived using a hollow cathode discharge lamp and a Fourier transform spectrometer. In addition, Hartree-Fock calculations where both the main relativistic and core-polarization effects were taken into account were carried out for both low- and high-excitation levels. There is a good agreement for most of the lines between our calculated branching fractions and the measurements of Lawler & Dakin in the region 9000-45 000 cm-1 for low excitation levels and with our measurements for high excitation levels in the region 23 500-63 100 cm-1. This, in turn, allowed us to combine the calculated branching fractions with the available experimental lifetimes to determine semi-empirical oscillator strengths for a set of 380 E1 transitions in Sc II. These oscillator strengths include the weak lines that were used previously to derive the solar abundance of scandium. The solar abundance of scandium is now estimated to logε⊙ = 3.04 ± 0.13 using these semi-empirical oscillator strengths to shift the values determined by Scott et al. The new estimated abundance value is in agreement with the meteoritic value (logεmet = 3.05 ± 0.02) of Lodders, Palme & Gail.

  4. Smelting of Scandium by Microwave Irradiation.

    Science.gov (United States)

    Fujii, Satoshi; Tsubaki, Shuntaro; Inazu, Naomi; Suzuki, Eiichi; Wada, Yuji

    2017-09-27

    Scandium is being explored as an alloying element for aluminum alloys, which are gaining importance as high-performance lightweight structural alloys in the transportation industry. A few years ago, Sc was also found to be suitable for use in electrical devices. High-Sc-content ScAlN thin films have attracted significant attention because of their strong piezoelectricity. The piezoelectric response of ScAlN suggests that ScAlN thin films formed on a hard substrate would be suitable surface acoustic wave wideband filters for next-generation wireless communication systems. However, it is often difficult to use ScAlN thin films in MEMS devices-including acoustic ones-because of the extremely high price of metallic Sc, given the difficulty associated with smelting it. Here, we propose a novel process for smelting Sc metal by microwave irradiation. Sc metal was able to be obtained successfully from ScF₃ through a microwave-irradiation-based carbon reduction reaction. The reaction temperature for this reduction process was approximately 880°C, which is half of that for the conventional smelting process involving reduction with Ca. Thus, the proposed microwave irradiation process has significant potential for use in the smelting of Sc metal.

  5. Smelting of Scandium by Microwave Irradiation

    Directory of Open Access Journals (Sweden)

    Satoshi Fujii

    2017-09-01

    Full Text Available Scandium is being explored as an alloying element for aluminum alloys, which are gaining importance as high-performance lightweight structural alloys in the transportation industry. A few years ago, Sc was also found to be suitable for use in electrical devices. High-Sc-content ScAlN thin films have attracted significant attention because of their strong piezoelectricity. The piezoelectric response of ScAlN suggests that ScAlN thin films formed on a hard substrate would be suitable surface acoustic wave wideband filters for next-generation wireless communication systems. However, it is often difficult to use ScAlN thin films in MEMS devices—including acoustic ones—because of the extremely high price of metallic Sc, given the difficulty associated with smelting it. Here, we propose a novel process for smelting Sc metal by microwave irradiation. Sc metal was able to be obtained successfully from ScF3 through a microwave-irradiation-based carbon reduction reaction. The reaction temperature for this reduction process was approximately 880°C, which is half of that for the conventional smelting process involving reduction with Ca. Thus, the proposed microwave irradiation process has significant potential for use in the smelting of Sc metal.

  6. Hydrometallurgical methods of recovery of scandium from the wastes of various technologies

    Science.gov (United States)

    Molchanova, T. V.; Akimova, I. D.; Smirnov, K. M.; Krylova, O. K.; Zharova, E. V.

    2017-03-01

    The recovery of scandium from the wastes of the production of uranium, titanium, iron-vanadium, and alumina is studied. The applied acid schemes of scandium transfer to a solution followed by ion-exchange recovery and extraction concentration of scandium ensure the precipitation of crude scandium oxides containing up to 5% Sc2O3. Scandium oxides of 99.96-99.99% purity are formed after additional refining of these crude oxides according to an extraction technology using a mixture 15% multiradical phosphine oxide or Cyanex-925 + 15% tributyl phosphate in kerosene.

  7. Synthesis and Reactivity of a Scandium Terminal Hydride: H2  Activation by a Scandium Terminal Imido Complex.

    Science.gov (United States)

    Han, Xianghao; Xiang, Li; Lamsfus, Carlos A; Mao, Weiqing; Lu, Erli; Maron, Laurent; Leng, Xuebing; Chen, Yaofeng

    2017-10-20

    Dihydrogen is easily activated by a scandium terminal imido complex containing the weakly coordinated THF. The reaction proceeds through a 1,2-addition mechanism, which is distinct from the σ-bond metathesis mechanism reported to date for rare-earth metal-mediated H2 activation. This reaction yields a scandium terminal hydride, which is structurally well-characterized, being the first one to date. The reactivity of this hydride is reported with unsaturated substrates, further shedding light on the existence of the terminal hydride complex. Interestingly, the H2 activation can be reversible. DFT investigations further eludciate the mechanistic aspects of the reactivity of the scandium anilido-terminal hydride complex with PhNCS but also on the reversible H2 activation process. © 2017 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  8. Thermoelectric material comprising scandium doped zinc cadmium oxide

    DEFF Research Database (Denmark)

    2016-01-01

    There is presented a composition of scandium doped Zinc Cadmium Oxide with the general formula ZnzCdxScyO which the inventors have prepared, and for which material the inventors have made the insight that it is particularly advantageous as an n-type oxide material, such as particularly advantageous...

  9. Scandium/carbon filters for soft x rays

    NARCIS (Netherlands)

    Artioukov, IA; Kasyanov, YS; Kopylets, IA; Pershin, YP; Romanova, SA

    2003-01-01

    This Note deals with thin-film soft x-ray filters for operation at the wavelengths near carbon K edge (similar to4.5 nm). The filters were fabricated by magnetron sputtering deposition of thin layers of scandium (total thickness 0.1-0.2 mum) onto films of polypropylene (thickness 1.5 mum) and

  10. Solvent extraction of scandium from lateritic nickel- cobalt ores using different organic reagents

    OpenAIRE

    Ferizoğlu Ece; Kaya Şerif; Topkaya Yavuz A.

    2016-01-01

    Scandium is the most important and strategic metal that can be recovered as a by-product from lateritic nickel-cobalt ores. In this research, different extractants were investigated in order to extract scandium from a sulfate medium by a using a solvent extraction method. Generally, the organic extractants are classified as acidic, neutral and basic organophosphorus compounds. However, in solvent extraction of scandium, the acidic and neutral organophosphorus compounds are preferred due to th...

  11. BASIC RESEARCH ON THE SEPARATION OF SCANDIUM YTTRIUM, AND THE RARE EARTHS BY SOLVENT EXTRACTION.

    Science.gov (United States)

    RARE EARTH ELEMENTS, * SOLVENT EXTRACTION ), (*CHELATE COMPOUNDS, RARE EARTH ELEMENTS), PURIFICATION, ATOMIC SPECTROSCOPY, SCANDIUM, YTTRIUM, PRASEODYMIUM, SAMARIUM, EUROPIUM, GADOLINIUM, TERBIUM, FLUORINE COMPOUNDS, KETONES

  12. Determination of scandium concentrate composition by WD-XRF and ICP-MS methods

    Science.gov (United States)

    Sarkisova, A. S.; Shibitko, A. O.; Abramov, A. V.; Rebrin, O. I.; Bunkov, G. M.; Lisienko, D. G.

    2017-09-01

    WD-XRF spectroscopy was applied for determining composition of scandium concentrate (ScC) containing 70 % scandium fluoride. Determination of ScC composition was performed using 6 glass beads reference materials produced by fusing synthesized mixture of analyte compounds with the lithium-borate flux in the ratio of 1:10. ScC powder with the known composition was then used as a powder pellet reference material to analyze scandium concentrate from technological line by external standard method. ICP-MS method was employed to control the ScC composition. The statistical data processing and metrological parameters evaluation of the analytical technique developed were carried out.

  13. Tin etching from metallic and oxidized scandium thin films

    Science.gov (United States)

    Pachecka, M.; Lee, C. J.; Sturm, J. M.; Bijkerk, F.

    2017-08-01

    The role of oxide on Sn adhesion to Sc surfaces was studied with in-situ ellipsometry, X-ray photoelectron spectroscopy and secondary electron microscopy. Sn etching with hydrogen radicals was performed on metallic Sc, metallic Sc with a native oxide, and a fully oxidized Sc layer. The results show that Sn adsorbs rather weakly to a non-oxidized Sc surface, and is etched relatively easily by atomic hydrogen. In contrast, the presence of native oxide on Sc allows Sn to adsorb more strongly to the surface, slowing the etching. Furthermore, thinner layers of scandium oxide result in weaker Sn adsorption, indicating that the layer beneath the oxide plays a significant role in determining the adsorption strength. Unexpectedly, for Sn on Sc2O3, and, to a lesser extent, for Sn on Sc, the etch rate shows a variation over time, which is explained by surface restructuring, temperature change, and hydrogen adsorption saturation.

  14. Tin etching from metallic and oxidized scandium thin films

    Directory of Open Access Journals (Sweden)

    M. Pachecka

    2017-08-01

    Full Text Available The role of oxide on Sn adhesion to Sc surfaces was studied with in-situ ellipsometry, X-ray photoelectron spectroscopy and secondary electron microscopy. Sn etching with hydrogen radicals was performed on metallic Sc, metallic Sc with a native oxide, and a fully oxidized Sc layer. The results show that Sn adsorbs rather weakly to a non-oxidized Sc surface, and is etched relatively easily by atomic hydrogen. In contrast, the presence of native oxide on Sc allows Sn to adsorb more strongly to the surface, slowing the etching. Furthermore, thinner layers of scandium oxide result in weaker Sn adsorption, indicating that the layer beneath the oxide plays a significant role in determining the adsorption strength. Unexpectedly, for Sn on Sc2O3, and, to a lesser extent, for Sn on Sc, the etch rate shows a variation over time, which is explained by surface restructuring, temperature change, and hydrogen adsorption saturation.

  15. Extraction of scandium by liquid di-2-ethylhexylphosphoric acid in fusible diluents

    Directory of Open Access Journals (Sweden)

    Ainur Isatayeva

    2015-03-01

    Full Text Available Currently widespread distribution of extraction methods using fusible reagents can be explained by a number of advantages, such as high kinetic characteristics of the process, the ease separation of two phases, high selectivity of many extractants, relatively complete regeneration. For the extraction of scandium in technological order, neutral and cation exchange extractants can be used. Several extraction reagents melt easily at high temperatures, and such melts can be used for extraction. Efficiency of the extraction of metal by cation reagents depends on many factors. Extraction of scandium by melt mixtures of di-2-ethylhexylphosphoric acid - higher carboxylic acid - paraffin and the effect of acidity of the aqueous phase, the concentration of scandium and the aqueous extractant in the organic phase, the volume ratio of organic and aqueous phases on the extraction of metal were studied. It was found that the extraction of scandium proceeds through the cation exchange mechanism. Scandium was extracted quantitatively (> 99.0% from acid solutions. The optimal concentration of di-2-ethylhexylphosphoric acid in the extractant was 0,250 M, quantitative extraction of scandium was observed in the range of its concentrations of 10-3-10-6 M and the volume ratio of organic phases to aqueous phases of 1:5 - 1:20.

  16. Thermodynamic and kinetic study of scandium(III) complexes of DTPA and DOTA: a step toward scandium radiopharmaceuticals.

    Science.gov (United States)

    Pniok, Miroslav; Kubíček, Vojtěch; Havlíčková, Jana; Kotek, Jan; Sabatie-Gogová, Andrea; Plutnar, Jan; Huclier-Markai, Sandrine; Hermann, Petr

    2014-06-23

    Diethylenetriamine-N,N,N',N'',N''-pentaacetic acid (DTPA) and 1,4,7,10-tetraazacyclododecane-1,4,7,10-tetraacetic acid (DOTA) scandium(III) complexes were investigated in the solution and solid state. Three (45)Sc NMR spectroscopic references suitable for aqueous solutions were suggested: 0.1 M Sc(ClO4)3 in 1 M aq. HClO4 (δSc =0.0 ppm), 0.1 M ScCl3 in 1 M aq. HCl (δSc =1.75 ppm) and 0.01 M [Sc(ox)4](5-) (ox(2-) = oxalato) in 1 M aq. K2C2O4 (δSc =8.31 ppm). In solution, [Sc(dtpa)](2-) complex (δSc = 83 ppm, Δν = 770 Hz) has a rather symmetric ligand field unlike highly unsymmetrical donor atom arrangement in [Sc(dota)](-) anion (δSc = 100 ppm, Δν = 4300 Hz). The solid-state structure of K8[Sc2(ox)7]⋅13 H2O contains two [Sc(ox)3](3-) units bridged by twice "side-on" coordinated oxalate anion with Sc(3+) ion in a dodecahedral O8 arrangement. Structures of [Sc(dtpa)](2-) and [Sc(dota)](-) in [(Hguanidine)]2[Sc(dtpa)]⋅3 H2O and K[Sc(dota)][H6 dota]Cl2⋅4 H2O, respectively, are analogous to those of trivalent lanthanide complexes with the same ligands. The [Sc(dota)](-) unit exhibits twisted square-antiprismatic arrangement without an axial ligand (TSA' isomer) and [Sc(dota)](-) and (H6 dota)(2+) units are bridged by a K(+) cation. A surprisingly high value of the last DOTA dissociation constant (pKa =12.9) was determined by potentiometry and confirmed by using NMR spectroscopy. Stability constants of scandium(III) complexes (log KScL 27.43 and 30.79 for DTPA and DOTA, respectively) were determined from potentiometric and (45)Sc NMR spectroscopic data. Both complexes are fully formed even below pH 2. Complexation of DOTA with the Sc(3+) ion is much faster than with trivalent lanthanides. Proton-assisted decomplexation of the [Sc(dota)](-) complex (τ1/2 =45 h; 1 M aq. HCl, 25 °C) is much slower than that for [Ln(dota)](-) complexes. Therefore, DOTA and its derivatives seem to be very suitable ligands for scandium

  17. Effects of iron on intermetallic compound formation in scandium modified Al–Si–Mg Alloys

    Energy Technology Data Exchange (ETDEWEB)

    Patakham, Ussadawut [National Metal and Materials Technology Center, National Science and Technology Development Agency, 114 Thailand Science Park, Klong Nueng, Klong Luang, Pathumthani 12120 (Thailand); Limmaneevichitr, Chaowalit, E-mail: chaowalit.lim@mail.kmutt.ac.th [Production Engineering Department, Faculty of Engineering, King Mongkut’s University of Technology Thonburi, 126 Pracha-Utid Rd., Bangmod, Tungkhru, Bangkok 10140 (Thailand)

    2014-12-15

    Highlights: • Iron reduces the modification effects of scandium in Al–Si–Mg alloys. • Morphologies of Sc-rich intermetallic phases vary with Fe and Sc contents and the cooling rates. • Sc neutralizes effects of Fe by changing Fe-rich intermetallic phases from platelets to more cubic. - Abstract: In general, iron has a strong tendency to dissolve in molten aluminum. Iron has very low solid solubility in aluminum–silicon casting alloys, so it will form intermetallic compounds that cause detrimental effects on mechanical properties. In this work, the effects of iron on intermetallic compound formations in scandium modified Al–Si–Mg alloys were studied. There were two levels of iron addition (0.2 and 0.4 wt.%) and two levels of scandium addition (0.2 and 0.4 wt.%). We found that the effects of scandium modification decreased with increasing iron addition. The morphologies of the complex intermetallic compounds were characterized by scanning electron microscopy (SEM), energy dispersive spectroscopy (EDS) and electron backscatter diffraction (EBSD) techniques. It was found that scandium changes the morphology of Fe-rich intermetallic compounds from β-phase (plate-like) to α-phase, which reduces the harmful effects of β-phase.

  18. Solvent extraction of scandium from lateritic nickel- cobalt ores using different organic reagents

    Directory of Open Access Journals (Sweden)

    Ferizoğlu Ece

    2016-01-01

    Full Text Available Scandium is the most important and strategic metal that can be recovered as a by-product from lateritic nickel-cobalt ores. In this research, different extractants were investigated in order to extract scandium from a sulfate medium by a using a solvent extraction method. Generally, the organic extractants are classified as acidic, neutral and basic organophosphorus compounds. However, in solvent extraction of scandium, the acidic and neutral organophosphorus compounds are preferred due to their higher extraction efficiencies. Thus, the aim of the present study was to compare the scandium extraction efficiencies of some acidic and neutral organic reagents. For this reason, Ionquest 290 (Bis(2,4,4-trimethylpenthyl phosphonic acid, DEHPA (Di(2-ethylhexyl phosphoric acid, Cyanex 272 ((Bis(2,4,4-trimethylpentyl phosphinic acid which are acidic organophosphorus compounds, and Cyanex 923 (Trialkylphosphine oxide, which is a neutral organophosphorus compound, were used. The extraction capacities of these organics were studied with respect to the extractant concentration at same pH and phase ratio. As a result of the study, DEHPA was found to have higher scandium extraction efficiency with lower iron extraction at pH = 0.55 at a phase ratio of 10:1 = A:O.

  19. Correlation between stoichiometry and properties of scandium oxide films prepared by reactive magnetron sputtering

    Science.gov (United States)

    Belosludtsev, Alexandr; Juškevičius, Kęstutis; Ceizaris, Lukas; Samuilovas, Romanas; Stanionytė, Sandra; Jasulaitienė, Vitalija; Kičas, Simonas

    2018-01-01

    Scandium oxide films were deposited on fused silica substrates by reactive pulsed DC magnetron sputtering. The use of feed-back optical emission monitoring enabled high-rate reactive deposition of films with tunable stoichiometry and properties. The under-stoichiometric, stoichiometric and over-stoichiometric scandium oxide films were prepared. The compressive stress in films was between 235 and 530 MPa. We showed that phase structure, density, surface roughness and optical properties of the scandium oxide are affected by the film stoichiometry and deposition conditions. Transparent scandium oxide films were slightly hydrophobic (94 ± 3°), homogeneous with a crystallite size of 20 ± 5 nm. The lowest extinction coefficient 0.7 × 10-3, the highest refractive index 2.08 (both quantities at the wavelength of 355 nm) and the highest density 4.1 ± 0.1 g cm-3 exhibited film prepared with the stoichiometric composition. Stoichiometric scandium oxide can be used in various optical applications as high refractive index and wide bandgap material. Transitions to under- or over-stoichiometry lead to a decrease of film density, refractive index and increase of the extinction coefficient.

  20. Mossbauer investigation of scandium oxide-hematite nanoparticles

    Science.gov (United States)

    Allwes, Mark; Sorescu, Monica

    Scandium oxide-doped hematite, xSc2O3*(1-x)alpha-Fe2O3 with molar concentration x =0.1, 0.3, and 0.5 was prepared by using ball milling, taking samples at times 0, 2, 4, 8, and 12 hours. The resulting Mossbauer spectra of the nanoparticles systems were parameterized using NORMOS-90. For each concentration, the spectra at 0 hours only consisted of 1 sextet, as the substitution of Sc2O3into Fe2O3 did not appear until after 2 hours of ball milling time (BMT). Concentration x =0.1 at BMT 2hours consisted of 2 sextets while x =0.3 and 0.5 were fit with 1 sextet and 1 quadrupole-split doublet. Concentration x =0.1 at BMT 4 and 8 hours consisted of 3 sextets, and at BMT 12 hours consisted of 4 sextets. For concentrations x =0.3 and 0.5 at BMT 4, 8, and 12 hours the spectra were fit with 3 sextets and 1 quadrupole-split doublet. With increasing initial concentration, the appearance of the quadrupole-split doublet became more pronounced, indicating the substitution of Fe into Sc2O3 occurred. But for x =0.1, the BMT did influence the number of sextets needed, causing an increase in substitution of Sc2O3 into Fe2O3.

  1. Association between toenail scandium levels and risk of acute myocardial infarction in European men: The EURAMIC and Heavy Metals Study

    NARCIS (Netherlands)

    Gómez-Aracena, J.; Martin-Moreno, J.M.; Riemersma, R.A.; Bode, P.; Gutiérrez-Bedmar, M.; Gorgojo, L.; Kark, J.D.; Garcia-Rodríguez, A.; Gomez-Gracia, E.; Kardinaal, A.F.M.; Aro, A.; Veer, P. van 't; Wedel, H.; Kok, F.J.; Fernández-Crehuet, J.

    2002-01-01

    The association between scandium status and risk of acute myocardial infarction (MI) was examined in a multicentre case control study in 10 centres from Europe and Israel. Scandium in toenails was assessed in 684 cases and 724 controls less than 70 years of age. Mean concentrations of toenail

  2. In-source laser spectroscopy developments at TRILIS-towards spectroscopy on actinium and scandium

    Energy Technology Data Exchange (ETDEWEB)

    Raeder, Sebastian, E-mail: raeder@triumf.ca; Dombsky, Marik; Heggen, Henning; Lassen, Jens; Quenzel, Thomas [TRIUMF, Canada' s National Laboratory for Nuclear and Particle Physics (Canada); Sjoedin, Marica [GANIL (France); Teigelhoefer, Andrea [TRIUMF, Canada' s National Laboratory for Nuclear and Particle Physics (Canada); Wendt, Klaus [Johannes Gutenberg-Universitaet Mainz, Institut fuer Physik (Germany)

    2013-04-15

    Resonance Ionization Laser Ion Sources (RILIS) have become a versatile tool for production and study of exotic nuclides at Isotope Separator On-Line (ISOL) facilities such as ISAC at TRIUMF. The recent development and addition of a grating tuned spectroscopy laser to the TRIUMF RILIS solid state laser system allows for wide range spectral scans to investigate atomic structures on short lived isotopes, e.g., those from the element actinium, produced in uranium targets at ISAC. In addition, development of new and improved laser ionization schemes for rare isotope production at ISAC is ongoing. Here spectroscopic studies on bound states, Rydberg states and autoionizing (AI) resonances on scandium using the existing off-line capabilities are reported. These results allowed to identify a suitable ionization scheme for scandium via excitation into an autoionizing state at 58,104 cm{sup - 1} which has subsequently been used for ionization of on-line produced exotic scandium isotopes.

  3. Process and Mechanical Properties: Applicability of a Scandium modified Al-alloy for Laser Additive Manufacturing

    Science.gov (United States)

    Schmidtke, K.; Palm, F.; Hawkins, A.; Emmelmann, C.

    The applicability of an aluminium alloy containing scandium for laser additive manufacturing (LAM) is considered. Modified aluminium alloys with a scandium content beyond the eutectic point offer great potential to become a high prioritized aerospace material. Depending on other alloying elements like magnesium or zirconium, strongly required weight reduction, corrosion resistance and improved strength properties of metallic light weight alloys can be achieved. The development, production and testing of parts built up by a laser powder bed process will be presented with regard to the qualification of the new material concept "ScalmalloyRP®" for laser additive manufacturing.

  4. Synthesis and structural characterization of scandium SALEN complexes.

    Science.gov (United States)

    Meermann, Christian; Sirsch, Peter; Törnroos, Karl W; Anwander, Reiner

    2006-02-28

    A series of heteroleptic scandium SALEN complexes, [(SALEN)Sc(mu-Cl)]2 and (SALEN)Sc[N(SiHMe2)2] is obtained via amine elimination reactions using [Sc(N(i)Pr2)2(mu-Cl)(THF)]2 and Sc[N(SiHMe2)2]3(THF) as metal precursors, respectively. H(2)SALEN ligand precursors comprising H2Salen [(1,2-ethandiyl)bis(nitrilomethylidyne)bis(2,4-di-tert-butyl)phenol], H2Salpren [(2,2-dimethylpropanediyl)bis(nitrilomethylidyne)bis(2,4-di-tert-butyl)phenol], H2Salcyc [(1R,2R)-(-)-1,2-cyclohexanediyl)bis(nitrilomethylidyne)bis(2,4-di-tert-butyl)phenol] and H2Salphen [((1S,2S)-(-)-1,2-diphenylethandiyl)bis(nitrilomethylidyne)bis(2,4-di-tert-butyl)phenol] are selected according to solubility and ligand backbone variation ("=N-(R)-N=" bite angle) criteria. Consideration is given to the feasibility of [Cl --> NR2] and [N(SiHMe2)2--> OSiR3] secondary ligand exchange reactions. X-ray crystal structure analyses of donor-free (Salpren)Sc(N(i)Pr2), (R,R)-(Salcyc)Sc[N(SiHMe2)2], (Salen)Sc(OSi(t)BuPh2) and (Salphen)Sc(OSiH(t)Bu2) reveal (i) a very short Sc-N bond distance of 2.000(3) A, (ii) weak beta(Si-H)(amido)-Sc agostic interactions and (iii) an exclusive intramolecularly tetradentate and intrinsically bent coordination mode of the SALEN ligands with angle(Ph,Ph) dihedral angles and Sc-[N(2)O(2)] distances in the 124.27(9)-127.7(3) degrees and 0.638(1)-0.688(1) A range, respectively.

  5. Scandium SALEN complexes bearing chloro, aryloxo, and hydroxo ligands.

    Science.gov (United States)

    Meermann, Christian; Törnroos, Karl W; Anwander, Reiner

    2009-03-16

    Heteroleptic amide complexes (SALEN)Sc[N(SiHMe(2))(2)] (SALEN = Salen(tBu,tBu), Salcyc(tBu,tBu), or Salpren(tBu,tBu) if not stated differently) were examined as synthesis precursors according to silylamine elimination reactions. Treatment of (SALEN)Sc[N(SiHMe(2))(2)] with H(2)O or phenols (HOAr(R,R); R = tBu, iPr) afforded complexes [(SALEN)Sc(mu-OH)](2) and (SALEN)Sc(OAr(R,R)), while chloro exchange products were formed from the respective reactions with NH(4)Cl or AlMe(2)Cl. Such complexes [(SALEN)Sc(mu-Cl)](2) and (SALEN)ScCl(thf) were also obtained by utilizing alternative synthesis protocols, allowing for controlled donor absence and presence. Heteroleptic amide precursors [Sc(NiPr(2))(2)(mu-Cl)(thf)](2) and [Sc[N(SiHMe(2))(2)](2)(mu-Cl)(thf)](2) readily undergo amine elimination reactions with H(2)SALEN derivatives to form the corresponding chloride complexes. Spectroscopic and X-ray structural data of the heteroleptic scandium complexes revealed an exclusive intramolecular tetradentate coordination mode of the SALEN ligands independent of the SALEN ligand bite angle and the nature of the "second" ligand (chloro, amido, aryloxo, hydroxo). The coordination of the SALEN ligands is rationalized on the basis of (a) the displacement d of the metal center from the [N(2)O(2)] least-squares plane, (b) the dihedral angle alpha between the phenyl rings of the salicylidene moieties, and (c) the angle beta = Ct-Ln-Ct (Ct = centroid of the phenyl rings) in the case of strongly twisted ligands.

  6. Vertical distribution of scandium in the north central Pacific

    Science.gov (United States)

    Amakawa, Hiroshi; Nomura, Miho; Sasaki, Kazunori; Oura, Yasuji; Ebihara, Mitsuru

    2007-06-01

    The concentrations of scandium (Sc) in seawater, which have remained unreported since the early 1970s, were determined together with those of yttrium (Y) and lanthanides (Ln) with samples from the north central Pacific Ocean (St. BO-3). The Sc concentration shows a so-called nutrient-like profile: it increases gradually from the surface (about 2 pmol/kg) to the ocean floor (about 20 pmol/kg). That pattern closely resembles those of Y and Ln (correlation coefficient (r) > 0.92). Some light-to-middle Ln (Pr-Tb) exhibit a closer correlation with Sc than do Y, La, or heavy Ln (Ho-Lu). In contrast, Y/Sc and Ln/Sc ratios (elemental abundance ratios) indicate that Sc is depleted compared to either Y or Ln in seawater more than in loess, which represents chemical compositions of crustal material. These observations offer a conflicting view of chemical reactivity related Y, Ln, and Sc: r values show that the chemical reactivity of Sc resembles those of Y and Ln, but differences of Y/Sc and Ln/Sc ratios in seawater and in loess suggest that the chemical reactivity of Sc differs from those of Y and Ln. More Sc data for seawater are necessary to clarify the chemical reactivity of Sc in the ocean. We also propose that comparative studies of vertical profiles of Sc and such elements as Fe, Ti, Zr, and Hf showing so-called nutrient-like profiles at the same oceanic stations would be helpful and effective for clarifying the behavior of Sc in the ocean.

  7. In situ observation of the reaction of scandium and carbon by neutron diffraction

    Energy Technology Data Exchange (ETDEWEB)

    Juarez-Arellano, Erick A., E-mail: eajuarez@unpa.edu.m [Institut fuer Geowissenschaften, Universitaet Frankfurt, Altenhoeferallee 1, 60438 Frankfurt a.M. (Germany); Universidad del Papaloapan, Circuito Central 200, Parque Industrial, Tuxtepec 68301 (Mexico); Winkler, Bjorn [Institut fuer Geowissenschaften, Universitaet Frankfurt, Altenhoeferallee 1, 60438 Frankfurt a.M. (Germany); Vogel, Sven C. [Los Alamos National Laboratory, Lujan Center. Mail Stop H805, Los Alamos, NM 87545 (United States); Senyshyn, Anatoliy [Forschungsneutronenquelle Heinz Maier-Leibnitz (FRM II), Technische Universitaet Muenchen, Lichtenbergstr. 1, D-85747 Garching (Germany); Materialwissenschaft, TU Darmstadt, Petersensstr. 23, D-64287 Darmstadt (Germany); Kammler, Daniel R. [Sandia National Laboratories, Albuquerque, NM 87185 (United States); Avalos-Borja, Miguel [CNyN, UNAM, A. Postal 2681, Ensenada, B.C. (Mexico)

    2011-01-05

    Research highlights: {yields} Exist two ScC cubic phases with B1-structure type differing in site occupancy of C. {yields} A new orthorhombic scandium carbide phase is formed at 1473(50) K. {yields} The recrystallization of alpha-Sc occurs between 1000 and 1223 K. - Abstract: The formation of scandium carbides by reaction of the elements has been investigated by in situ neutron diffraction up to 1823 K. On heating, the recrystallization of {alpha}-Sc occurs between 1000 and 1223 K. The formation of Sc{sub 2}C and ScC (NaCl-B1 type structure) phases has been detected at 1323 and 1373 K, respectively. The formation of a new orthorhombic scandium carbide phase was observed at 1473(50) K. Once the scandium carbides are formed they are stable upon heating or cooling. No other phases were detected in the present study, in which the system was always carbon saturated. The thermal expansion coefficients of all phases have been determined, they are constant throughout the temperature interval studied.

  8. The effects of aluminum or scandium on the toughness, density and ...

    African Journals Online (AJOL)

    The effects of the substitution of aluminum or scandium on the density, toughness as well as the stability of the phases formed by such an addition on platinum, iridium, rhodium and palladium metals were evaluated with the density functional quantum mechanical calculation methods. All the metals had four atoms per ...

  9. Effects of erbium‑and chromium‑doped yttrium scandium gallium ...

    African Journals Online (AJOL)

    2014-08-21

    Aug 21, 2014 ... surfaces because of its high power, and the ablation was deeper for these samples. High‑magnification SEM ... Key words: Erbium chromium‑doped yttrium scandium gallium garnet, diode laser, restorative dental materials, scanning electron ... garnet (Nd: YAG) and carbon dioxide (CO2) lasers on indirect ...

  10. Chemical and biological evaluation of scandium(III)-polyaminopolycarboxylate complexes as potential PET agents and radiopharmaceuticals

    Energy Technology Data Exchange (ETDEWEB)

    Huclier-Markai, S.; Sabatie, A.; Ribet, S. [Univ. de Nantes (France). Lab. Subatech; Kubicek, V.; Hermann, P. [Charles Univ., Prague (Czech Republic). Dept. of Inorganic Chemistry; Paris, M. [Univ. de Nantes (France). Inst. des Materiaux; Vidaud, C. [CEA/DSV/iBEB/SBTN, Bagnols sur Ceze (France). Lab. d' Etude des Proteines Cibles; Cutler, C.S. [Univ. of Missouri, Columbia, MO (United States). Reserach Reactor Center

    2011-07-01

    Scandium isotopes ({sup 44}Sc, {sup 47}Sc) are more available and their properties are convenient for either PET imaging or radiotherapy. To use them in nuclear medicine, ligands forming complexes with a high stability are necessary. Available experimental data on stability constants for complexes of ligands such as EDTA, DTPA, DOTA, NOTA and TETA with various metal ions have been published. But scandium is the exception since scarce data is available in the literature. Values of stability constants of Sc(III) with the ligands were determined by free-ion selective radiotracer extraction, complemented by {sup 45}Sc NMR and potentiometry data. The thermodynamic stability of the Sc-complexes increases in the order TETA < NOTA < EDTA < DTPA < DOTA. The in vitro stability of the Sc(III) complexes was studied in the presence of hydroxyapatite and rat serum to estimate their in vivo stability. The most stable complex was shown to be Sc-DOTA.

  11. Precipitation behaviour and recrystallisation resistance in aluminum alloys with additions of hafnium, scandium and zirconium

    OpenAIRE

    Hallem, Håkon

    2005-01-01

    The overall objective of this work has been to develop aluminium alloys, which after hot and cold deformation are able to withstand high temperatures without recrystallising. This has been done by investigating aluminium alloys with various additions of hafnium, scandium and zirconium, with a main focus on Hf and to which extent it may partly substitute or replace Zr and/or Sc as a dispersoid forming elements in these alloys. What is the effect of hafnium, alone and in combination with Zr...

  12. Pilot-scale recovery of rare earths and scandium from phosphogypsum and uranium leachates

    Directory of Open Access Journals (Sweden)

    Mashkovtsev Maxim

    2016-01-01

    Full Text Available Ural Federal University (UrFU and VTT have performed joint research on development of industrial technologies for the extraction of REM and Scandium compounds from phosphogypsum and Uranium ISL leachate solutions. Leaching-absorption experiments at UrFU have been supported with multicomponent solution modelling by VTT. The simulations have been performed with VTT’s ChemSheet/Balas program and can be used for speciation calculations in the lixiviant solution. The experimental work combines solvent extraction with advanced ion exchange methodology in a pilot facility capable of treating 5 m3 solution per hour. Currently, the plant produces cerium carbonate, lanthanum oxide, neodymium oxide and concentrate of heavy rare earth metals. A batch of 45 t solids has been processed with the gain of 100 kg’s of REM concentrate. A mini-pilot plant with productivity above 50 liters per hour has been applied to recover scandium oxide and REE concentrates from the uranium ISL solution. As the preliminary product contains radioactivity (mainly strontium, an additional decontamination and cleaning of both concentrates by extraction has rendered a necessity. Finally a purified 99% concentrate of scandium oxide as well as 99% rare earth concentrate are received.

  13. Optimization of scandium oxide growth by high pressure sputtering on silicon

    Energy Technology Data Exchange (ETDEWEB)

    Feijoo, P.C., E-mail: pedronska@fis.ucm.es; Pampillon, M.A.; San Andres, E.; Lucia, M.L.

    2012-12-30

    This work demonstrates the viability of scandium oxide deposition on silicon by means of high pressure sputtering. Deposition pressure and radio frequency power are varied for optimization of the properties of the thin films and the ScO{sub x}/Si interface. The physical characterization was performed by ellipsometry, Fourier transform infrared spectroscopy, x-ray diffraction and transmission electron microscopy. Aluminum gate electrodes were evaporated for metal-insulator-semiconductor (MIS) fabrication. From the electrical characterization of the MIS devices, the density of interfacial defects is found to decrease with deposition pressure, showing a reduced plasma damage of the substrate surface for higher pressures. This is also supported by lower flatband voltage shifts in the capacitance versus voltage hysteresis curves. Sputtering at high pressures (above 100 Pa) reduces the interfacial SiO{sub x} formation, according to the infrared spectra. The growth rates decrease with deposition pressure, so a very accurate control of the layer thicknesses could be provided. - Highlights: Black-Right-Pointing-Pointer Scandium oxide is considered as a high permittivity dielectric. Black-Right-Pointing-Pointer Scandium oxide was deposited on Si by high pressure sputtering. Black-Right-Pointing-Pointer Characterization was performed for deposition condition optimization. Black-Right-Pointing-Pointer High deposition pressures showed higher film and interface quality.

  14. Recovery of Scandium from Leachate of Sulfation-Roasted Bayer Red Mud by Liquid-Liquid Extraction

    Science.gov (United States)

    Liu, Zhaobo; Li, Hongxu; Jing, Qiankun; Zhang, Mingming

    2017-11-01

    The leachate obtained from sulfation-roasted Bayer red mud is suitable for extraction of scandium by liquid-liquid solvent extraction because it contains trace amounts of Fe3+ and Si4+. In this study, a completely new metallurgical process for selective recovery of scandium from Bayer red mud was proposed. The extraction performances of Sc3+, Fe3+, Al3+, Si4+, Ca2+, and Na+ from synthetic leachate of sulfation-roasted red mud were first investigated using organophosphorus extractants (di-2-ethylhexyl phosphoric acid P204 and 2-ethylhexyl phosphoric acid mono-2-ethylhexyl ester P507) and carboxylic acid extractant (Versatic acid 10). It shows that P204 has an excellent extraction ability and that it can be applied to the scandium recovery. P507 and Versatic acid 10 are much poorer in performance for selective extraction of scandium. In the leachate of sulfation-roasted red mud, approximately 97% scandium can be recovered using a P204/sulfonated kerosene (1% v/v) extraction system under the condition of an organic-to-aqueous phase ratio of 10:1 and with an extraction temperature of 15°C.

  15. Scandium-doped zinc cadmium oxide as a new stable n-type oxide thermoelectric material

    DEFF Research Database (Denmark)

    Han, Li; Christensen, Dennis Valbjørn; Bhowmik, Arghya

    2016-01-01

    Scandium-doped zinc cadmium oxide (Sc-doped ZnCdO) is proposed as a new n-type oxide thermoelectric material. The material is sintered in air to maintain the oxygen stoichiometry and avoid instability issues. The successful alloying of CdO with ZnO at a molar ratio of 1 : 9 significantly reduced...... is a good candidate for improving the overall conversion efficiencies in oxide thermoelectric modules. Meanwhile, Sc-doped ZnCdO is robust in air at high temperatures, whereas other n-type materials, such as Al-doped ZnO, will experience rapid degradation of their electrical conductivity and ZT....

  16. Scandium and yttrium phosphasalen complexes as initiators for ring-opening polymerization of cyclic esters.

    Science.gov (United States)

    Bakewell, Clare; White, Andrew J P; Long, Nicholas J; Williams, Charlotte K

    2015-03-02

    The synthesis and characterization of novel scandium and yttrium phosphasalen complexes is reported, where phosphasalen refers to two different bis(iminophosphorane) derivatives of the more ubiquitous salen ligands. The activity of the complexes as initiators for the ring-opening polymerization of cyclic esters is presented. The scandium complexes are inactive for lactide polymerization but slow and controlled initiators for ε-caprolactone polymerization. The lack of activity toward lactide exhibited by these compounds is probed, and a rare example of single-monomer insertion product, unable to undergo further reactions with lactide, is identified. In contrast, the analogous yttrium phosphasalen complex is a very active initiator for the ring-opening polymerization of rac-lactide (kobs = 1.5 × 10(-3) s(-1) at 1:500 [yttrium initiator]:[rac-lactide], 1 M overall concentration of lactide in THF at 298 K). In addition to being a very fast initiator, the yttrium complex also maintains excellent levels of polymerization control and a high degree of isoselectivity, with the probability of isotactic enchainment being Pi = 0.78 at 298 K.

  17. Thermodynamic parameters of scandium trifluoride and triiodide in the condensed state

    Science.gov (United States)

    Aristova, N. M.; Belov, G. V.

    2015-06-01

    The thermodynamic properties of new classes of compounds, particularly scandium trihalides ScF3, ScCl3, ScBr3, and ScI3, are added to the IVTANTHERMO software package. A critical analysis and processing of the entire array of primary data available in the literature is performed. An equation approximating the temperature dependence of heat capacity in the temperature range 298.15- T m (K) is derived for each crystalline scandium trihalide. The resulting equations C {/p po}( T) for the solid state and the data for the liquid phase are used to calculate the thermodynamic functions of entropy, the reduced Gibbs free energies, and the enthalpy increments. Both the experimental data available in literature and the missing estimated thermodynamic data are used in calculations. The error of the recommended values is estimated in all cases. In the first part of this work, we describe the thermodynamic properties of ScF3 and ScI3 used as the reference data for calculating the thermodynamic functions of ScCl3 and ScBr3, for which experimental data are either very scarce or missing altogether. The resulting data are added to the database of the IVTANTHERMO software package.

  18. Atomic layer deposition of scandium-based oxides

    Energy Technology Data Exchange (ETDEWEB)

    Nyns, Laura; Lisoni, Judit G.; Bosch, Geert van den; Elshocht, Sven van; Houdt, Jan van [IMEC, Leuven (Belgium)

    2014-02-15

    Gd{sub x}Sc{sub 2-x}O{sub 3} and Al{sub x}Sc{sub 2-x}O{sub 3} have been investigated as potential high-k intergate dielectric (IGD) in planar NAND flash technology, such as hybrid floating gate (HFG). We have examined the atomic layer deposition (ALD) of Sc{sub 2}O{sub 3}, Gd{sub x}Sc{sub 2-x}O{sub 3}, and Al{sub x}Sc{sub 2-x}O{sub 3} on Si using Sc(MeCp){sub 3}, Gd({sup i}PrCp){sub 3}, TMA, and H{sub 2}O as precursors. The composition of Gd{sub x}Sc{sub 2-x}O{sub 3} and Al{sub x}Sc{sub 2-x}O{sub 3} ranged from 4% to 76% Gd and from 7% to 66% Al, respectively. All compositions show linear growth behavior. While pure Sc{sub 2}O{sub 3} is crystalline as-deposited, the layer becomes amorphous once ∝20% of Al is added. The (222) reflection of the cubic phase is also seen for Gd{sub x}Sc{sub 2-x}O{sub 3} with less than 9% Gd. The bandgap of as-deposited Gd{sub x}Sc{sub 2-x}O{sub 3} decreases with increasing Gd content while the opposite trend is observed for Al{sub x}Sc{sub 2-x}O{sub 3}. A k-value of ∝21 can be obtained for Gd{sub x}Sc{sub 2-x}O{sub 3} with approximately 26-52% Gd, irrespective of the Gd content. For Al{sub x}Sc{sub 2-x}O{sub 3} on the other hand, a maximum k-value of ∝19 is achieved with ∝48% Al. Although the k-value of Al{sub x}Sc{sub 2-x}O{sub 3} is lower than that of Gd{sub x}Sc{sub 2-x}O{sub 3}, its large breakdown field makes this material more suitable for HFG flash applications. (copyright 2014 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  19. Recovery of Scandium(III) from Aqueous Solutions by Solvent Extraction with the Functionalized Ionic Liquid Betainium Bis(trifluoromethylsulfonyl)imide

    OpenAIRE

    Onghena, Bieke; Binnemans, Koen

    2015-01-01

    The ionic liquid betainium is(trifluoromethylsulfonyl)imide [Hbet][Tf2N] was used for the extraction of scandium from aqueous solutions. The influence of several extraction parameters on the extraction efficiency was investigated, including the initial metal concentration, phase ratio, and pH. The extraction kinetics was examined, and a comparison was made between conventional liquid−liquid extraction and homogeneous liquid−liquid extraction (HLLE). The stoichiometry of the extracted scandium...

  20. Modification mechanism of eutectic silicon in Al–6Si–0.3Mg alloy with scandium

    Energy Technology Data Exchange (ETDEWEB)

    Patakham, Ussadawut [Manufacturing and Systems Engineering Program, Department of Production Engineering, Faculty of Engineering, King Mongkut’s University of Technology Thonburi, 126 Pracha-Utid Rd., Bangmod, Tungkhru, Bangkok 10140 (Thailand); Kajornchaiyakul, Julathep [National Metal and Material Technology Center, National Science and Technology Development Agency, 114 Thailand Science Park, Klong Nueng, Klong Luang, Pathumthani 12120 (Thailand); Limmaneevichitr, Chaowalit, E-mail: chaowalit.lim@kmutt.ac.th [Manufacturing and Systems Engineering Program, Department of Production Engineering, Faculty of Engineering, King Mongkut’s University of Technology Thonburi, 126 Pracha-Utid Rd., Bangmod, Tungkhru, Bangkok 10140 (Thailand)

    2013-10-25

    Highlights: •Morphologies and growth of Sc and Sr-modified eutectic silicon resemble those of dendrites. •Crystal orientation of eutectic aluminum depends on growth characteristics of eutectic silicon. •We report strong evidence of the occurrence of an impurity-induced twinning mechanism. -- Abstract: The modification mechanism of eutectic silicon in Al–6Si–0.3Mg alloy with scandium was studied. The crystallographic orientation relationships between primary dendrites and the eutectic phase of unmodified and modified Al–6Si–0.3 Mg alloys were determined using electron backscatter diffraction (EBSD). The orientation of aluminum modified with scandium in the eutectic phase was different from that of the neighboring primary dendrites. This result implies that eutectic aluminum grows epitaxially from the surrounding primary aluminum dendrites in the unmodified alloy and that eutectic aluminum grows competitively from the surrounding primary aluminum dendrites in the modified alloy. The pole figure maps of eutectic Si in the [1 0 0], [1 1 0] and [1 1 1] axes of the unmodified and Sc-modified alloys were different, suggesting that the eutectic Al and Si crystals in modified alloy growth are more isotropic and cover a larger set of directions. The lattice fringes of Si of the alloys with and without Sc modification were different in the TEM results. The lattice fringes of Si in modified alloy were found to be multiple twins. However, this was not observed in the unmodified alloy. The growth characteristic of eutectic Si crystal in modified alloy suggests the occurrence of multiple twinning reactions and the formation of a high density of twins. This modification mechanism by Sc is explained by the results of scanning electron microscopy (SEM), electron backscatter diffraction (EBSD) and transmission electron microscopy (TEM) analysis, which provide strong evidence of the occurrence of the impurity-induced twinning (IIT) mechanism.

  1. Grain refinement mechanism in an Al-Si-Mg alloy with scandium

    Energy Technology Data Exchange (ETDEWEB)

    Patakham, Ussadawut [Department of Production Engineering, Faculty of Engineering, King Mongkut' s University of Technology Thonburi, 126 Pracha-Utid Rd., Bangmod, Tungkhru, Bangkok 10140 (Thailand); Kajornchaiyakul, Julathep [National Metal and Material Technology Center, National Science and Technology Development Agency, 114 Thailand Science Park, Klong Nueng, Klong Luang, Pathumthani 12120 (Thailand); Limmaneevichitr, Chaowalit, E-mail: chaowalit.lim@kmutt.ac.th [Department of Production Engineering, Faculty of Engineering, King Mongkut' s University of Technology Thonburi, 126 Pracha-Utid Rd., Bangmod, Tungkhru, Bangkok 10140 (Thailand)

    2012-11-25

    Highlights: Black-Right-Pointing-Pointer Scandium can be used to refine aluminum grains in an Al-Si-Mg aluminum alloy. Black-Right-Pointing-Pointer The effectiveness of Sc is lower than that of conventional Al-Ti grain refiners. Black-Right-Pointing-Pointer Al{sub 3}Sc particles can act as heterogeneous nuclei of aluminum phases. Black-Right-Pointing-Pointer Higher alloying elements cause more intermetallic compound phases. Black-Right-Pointing-Pointer Those phases cannot effectively act as heterogeneous nuclei compared with Al{sub 3}Sc particles. - Abstract: Grain refinement of the primary aluminum ({alpha}-Al) phase in a hypoeutectic Al-Si alloy using scandium (Sc) was studied to identify the grain refinement mechanism. Optical microscopy (OM), Scanning electron microscopy (SEM) with energy dispersive spectroscopy (EDS) and electron backscatter diffraction (EBSD) techniques were extensively used in this study. We found that Sc refined grains of primary aluminum. However, the grain refinement efficiency of Sc was considerably lower than that of titanium (Ti) in the Al-Si-Mg foundry alloy. It was evident that the precipitated Sc-containing phases acted as heterogeneous nucleation sites for the primary aluminum phase. The Sc-containing heterogeneous sites are irregular in shape with sizes between 3 and 5 {mu}m. At least three groups of nuclei based on their chemical composition were found, i.e., (i) Al and Sc, (ii) Al, Si, Mg, and Sc, and (iii) Al, Si, Mg, Sc, and Fe. Crystal orientation mapping showed primary aluminum dendrites with one orientation in each grain near Al{sub 3}Sc particles. The grain refinement mechanism of Sc for aluminum relies on heterogeneous nucleation of Al{sub 3}Sc particles, with less responsibly for grain growth restriction. Many intermetallic phases with Al, Si, Fe, Mg and Sc as their major components were found, and these phases could not effectively act as heterogeneous nuclei.

  2. Neutron and Charged-Particle Induced Cross Sections for Radiochemistry for Isotopes of Scandium, Titanium, Vanadium, Chromium, Manganese, and Iron

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, K; Hoffman, R D; Dietrich, F S; Bauer, R; Mustafa, M

    2004-11-30

    We have developed a set of modeled nuclear reaction cross sections for use in radiochemical diagnostics. Local systematics for the input parameters required by the Hauser-Feshbach statistical model were developed and used to calculate neutron and proton induced nuclear reaction cross sections in the mass region of scandium, titanium, vanadium, chromium, manganese, and iron (21 {le} Z {le} 26, 20 {le} N {le} 32).

  3. A composite cathode based on scandium doped titanate with enhanced electrocatalytic activity towards direct carbon dioxide electrolysis.

    Science.gov (United States)

    Yang, Liming; Xie, Kui; Wu, Lan; Qin, Qingqing; Zhang, Jun; Zhang, Yong; Xie, Ting; Wu, Yucheng

    2014-10-21

    A composite cathode based on redox-stable La0.2Sr0.8TiO(3+δ) (LSTO) can perform direct carbon dioxide electrolysis; however, the insufficient electro-catalytic activity limits the electrode performances and current efficiencies. In this work, catalytically active scandium is doped into LSTO to enhance the electro-catalytic activity for CO2 electrolysis. The structures, electronic conductivities and ionic conductivities of La0.2Sr0.8Ti(1-x)Sc(x)O (LSTS(x)O) (x = 0, 0.05, 0.1, 0.15 and 0.2) are systematically studied and further correlated with electrode performances. The ionic conductivities of single-phase LSTS(x)O (x = 0, 0.05, 0.1 and 0.15) remarkably improve versus the scandium doping contents though the electrical conductivities gradually change in an adverse trend. Electrochemical measurements demonstrate promising electrode polarisation of LSTS(x)O electrodes and increasing scandium doping contents accordingly improve electrode performances. The Faradic efficiencies of carbon dioxide electrolysis are enhanced by 20% with LSTS0.15O in contrast to bare LSTO electrodes in a solid oxide electrolyser at 800 °C.

  4. Adsorption of hydrogen in Scandium/Titanium decorated nitrogen doped carbon nanotube

    Energy Technology Data Exchange (ETDEWEB)

    Mananghaya, Michael, E-mail: mikemananghaya@gmail.com [De La Salle University, 2401 Taft Ave, 0922, Manila (Philippines); DLSU STC Laguna Boulevard, LTI Spine Road Barangays Biñan and Malamig, Biñan City, Laguna (Philippines); DOST-ASTHRDP, PCIEERD, Gen. Santos Ave., Bicutan, Taguig City 1631 (Philippines); Belo, Lawrence Phoa; Beltran, Arnel [De La Salle University, 2401 Taft Ave, 0922, Manila (Philippines); DLSU STC Laguna Boulevard, LTI Spine Road Barangays Biñan and Malamig, Biñan City, Laguna (Philippines)

    2016-09-01

    Nitrogen doped Carbon Nanotube with divacancy (4ND-CN{sub x}NT) that is decorated with Scandium and Titanium as potential hydrogen storage medium using the pseudo potential density functional method was investigated. Highly localized states near the Fermi level, which are derived from the nitrogen defects, contribute to strong Sc and Ti bindings, which prevent metal aggregation and improve the material stability. A detailed Comparison of the Hydrogen adsorption capability with promising system-weight efficiency of Sc over Ti was elucidated when functionalized with 4ND-CN{sub x}NT. Finally, the (Sc/4ND){sub 10}-CN{sub x}CNT composite material has a thermodynamically favorable adsorption and consecutive adsorption energy for ideal reversible adsorption and desorption of hydrogen at room temperature such that it can hold at least 5.8 wt% hydrogen molecules at the LDA and GGA level. - Highlights: • Carbon Nanotube with divacancy (4ND-CN{sub x}NT) decorated with Sc and Ti. • Nitrogen defects, contribute to strong Sc and Ti bindings. • H{sub 2} and (Sc/4ND){sub 10}-CN{sub x}CNT has a favorable adsorption. • 5.8 wt% adsorption at the LDA and GGA level.

  5. Urinary monitoring of exposure to yttrium, scandium, and europium in male Wistar rats.

    Science.gov (United States)

    Kitamura, Yasuhiro; Usuda, Kan; Shimizu, Hiroyasu; Fujimoto, Keiichi; Kono, Rei; Fujita, Aiko; Kono, Koichi

    2012-12-01

    On the assumption that rare earth elements (REEs) are nontoxic, they are being utilized as replacements of toxic heavy metals in novel technological applications. However, REEs are not entirely innocuous, and their impact on health is still uncertain. In the past decade, our laboratory has studied the urinary excretion of REEs in male Wistar rats given chlorides of europium, scandium, and yttrium solutions by one-shot intraperitoneal injection or oral dose. The present paper describes three experiments for the suitability and appropriateness of a method to use urine for biological monitoring of exposure to these REEs. The concentrations of REEs were determined in cumulative urine samples taken at 0-24 h by inductively coupled plasma atomic emission spectroscopy, showing that the urinary excretion of REEs is <2 %. Rare earth elements form colloidal conjugates in the bloodstream, which make high REEs accumulation in the reticuloendothelial system and glomeruli and low urinary excretion. The high sensitivity of inductively coupled plasma-argon emission spectrometry analytical methods, with detection limits of <2 μg/L, makes urine a comprehensive assessment tool that reflects REE exposure. The analytical method and animal experimental model described in this study will be of great importance and encourage further discussion for future studies.

  6. Selective recovery of vanadium and scandium by ion exchange with D201 and solvent extraction using P507 from hydrochloric acid leaching solution of red mud.

    Science.gov (United States)

    Zhu, Xiaobo; Li, Wang; Tang, Sen; Zeng, Majian; Bai, Pengyuan; Chen, Lunjian

    2017-05-01

    D201 resin and P507 extractant diluted with sulfonated kerosene were used to respectively separate vanadium and scandium, and impurity ions from hydrochloric acid leaching solution of red mud. More than 99% of vanadium was selectively adsorbed from the hydrochloric acid leaching solution under the conditions of pH value of 1.8, volume ratio of leaching solution to resin of 10, and flow rate of 3.33 mL/min. Maximum extraction and separation of scandium was observed from the acid leaching solution at an aqueous pH value of 0.2. More than 99% of scandium can be selectively extracted using 15% P507, 5% TBP at the aqueous solution/organic phase (A/O) ratio of 10:1 for 6 min. The loaded organic phase was washed with 0.3 mol/L sulfuric acid, wherein most impurities were removed. After the process of desorption or stripping, precipitation, and roasting, high-purity V2O5 and Sc2O3 were obtained. Finally, a conceptual flow sheet was established to separate and recover vanadium and scandium from red mud hydrochloric acid leaching solution. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. Random-field Potts model for the polar domains of lead magnesium niobate and lead scandium tantalate

    Energy Technology Data Exchange (ETDEWEB)

    Qian, H.; Bursill, L.A

    1997-06-01

    A random filed Potts model is used to establish the spatial relationship between the nanoscale distribution of charges chemical defects and nanoscale polar domains for the perovskite-based relaxor materials lead magnesium niobate (PMN) and lead scandium tantalate (PST). The random fields are not set stochastically but are determined initially by the distribution of B-site cations (Mg, Nb) or (Sc, Ta) generated by Monte Carlo NNNI-model simulations for the chemical defects. An appropriate random field Potts model is derived and algorithms developed for a 2D lattice. It is shown that the local fields are strongly correlated with the chemical domain walls and that polar domains as a function of decreasing temperature is simulated for the two cases of PMN and PST. The dynamics of the polar clusters is also discussed. 33 refs., 9 figs.

  8. Development of methods for the selective separation of scandium, zirconium and tin for radiopharmaceutical applications; Entwicklung von Methoden zur selektiven Trennung von Scandium, Zirkonium und Zinn fuer radiopharmazeutische Anwendungen

    Energy Technology Data Exchange (ETDEWEB)

    Dirks-Fandrei, Carina

    2014-07-01

    The subject of the present work is the development of fast and highly selective methods for the separation and purification of scandium, zirconium and tin radionuclides from potential target materials for use in nuclear medicine. A number of selected resins (TrisKem International) were first characterized with respect to their extraction behaviour towards a large number of cations. Characterization studies were performed in batch experiments by determination of weight distribution ratios D{sub w} and further the influence of interferences on the uptake of these elements was evaluated. Weight distribution ratios were determined in different acids and acid concentrations with main focus on scandium, tin or zirconium. The interference of macro amounts of Calcium and Ti on the Sc extraction was evaluated as well as the interference of macro amounts of Y on the Zr extraction. Best suited uptake conditions were found for Scandium on DGA were determined to be 2.5 M HNO{sub 3} for Ti-Targets and 0.1 M HNO{sub 3} for Calcium-Targets. Otherwise it is also possible to extract Sc with TRU Resin. High uptakes were obtained at 2.5 M HNO{sub 3} for simulated Ti- and Calcium-targets. Separation methods were developed using elution studies; employed conditions were chosen according to parameters evaluated in the batch-experiment. The developed methods allowed separating Sc very rapidly in high purity very rapidly from Ti- or Calcium-targets. For Zr a separation method based on UTEVA Resin has been developed. Following results of batch experiments simulated Y-target solution were loaded onto a UTEVA resin column from 6 M HNO{sub 3}; the elution of Zr could be performed in 0.01 M oxalic acid. Decontamination factors in the order of 10{sup 4}-10{sup 5} could be obtained applying the developed method; the method thus allowed separating Zr in a high purity. Initial testing of a method for the separation of Sn from Cd targets based on the use of TBP Resin showed that the TBP resin seems

  9. The impact of an erbium, chromium:yttrium-scandium-gallium-garnet laser with radial-firing tips on endodontic treatment.

    Science.gov (United States)

    Schoop, U; Barylyak, A; Goharkhay, K; Beer, F; Wernisch, J; Georgopoulos, A; Sperr, W; Moritz, A

    2009-01-01

    Radial-firing tips should allow a more homogeneous laser irradiation of root canal walls. The aim of the study was to assess the effects of erbium, chromium:yttrium-scandium-gallium-garnet (Er,Cr:YSGG) laser irradiation in conjunction with those newly designed tips. The investigation comprised bacteriology, morphological evaluations and temperature measurements. Root canals were inoculated with two test strains and laser irradiated with power settings of 0.6 W and 0.9 W and a repetition rate of 20 Hz. Subsequently, the samples were subjected to microbiological evaluation. The morphological changes of the canal walls were assessed by scanning electron microscopy. To reveal possible thermal side effects, we carried out temperature measurements. The bacteriological evaluation revealed a decisive disinfectant effect. Scanning electron microscopy showed the homogeneous removal of smear layer from the root canal walls. The temperature rise at the root surface during the irradiation was moderate, yielding 1.3 degrees C for the 0.6 W setting and 1.6 degrees C for the 0.9 W setting. The investigations indicated that the Er,Cr:YSGG laser, in conjunction with radial-firing tips, is a suitable tool for the elimination of bacteria in root canals and for the removal of smear layer.

  10. Effect of scandium addition on the microstructure, mechanical and wear properties of the spray formed hypereutectic aluminum–silicon alloys

    Energy Technology Data Exchange (ETDEWEB)

    Raghukiran, Nadimpalli; Kumar, Ravi, E-mail: nvrk@iitm.ac.in

    2015-08-12

    Hypereutectic Al–x%Si–0.8Sc alloys (x=13, 16, 19 and 22 wt%) were produced by spray forming. The microstructures of all the alloys exhibited very fine silicon phase with average size of about 5–10 µm irrespective of the silicon content of the alloy. Transmission electron microscopy revealed the presence of a nano-scale scandium rich phase, identified as AlSi{sub 2}Sc{sub 2} (V-phase) uniformly distributed in the alloy. The presence of V-phase resulted in higher matrix hardness (1.34 GPa) in contrast to 1.04 GPa observed in the case of binary Al–Si alloys by nanoindentation. Isothermal heat treatment at 375 °C revealed insignificant coarsening of silicon phase in both binary and ternary alloys. The Al–x%Si–0.8Sc alloys exhibited higher flow stress and tensile strength in contrast to their binary alloy counterparts which was attributed to the bi-modal size distribution of the strengthening phases in the form of nano-scale V-phase and sub-micron to 10 µm size silicon particles. The pin-on-disk wear tests exhibited appreciable improvement in the wear performance of the relatively low-silicon content ternary alloys over their binary counterparts while the high-silicon content binary and ternary alloys exhibited no much difference in the wear performance.

  11. Scandium and Titanium Containing Single-Walled Carbon Nanotubes for Hydrogen Storage: a Thermodynamic and First Principle Calculation.

    Science.gov (United States)

    Mananghaya, Michael; Yu, Dennis; Santos, Gil Nonato; Rodulfo, Emmanuel

    2016-06-15

    The generalized gradient approximation (GGA) to density functional theory (DFT) calculations indicate that the highly localized states derived from the defects of nitrogen doped carbon nanotube with divacancy (4ND-CNxNT) contribute to strong Sc and Ti bindings, which prevent metal aggregation. Comparison of the H2 adsorption capability of Sc over Ti-decorated 4ND-CNxNT shows that Ti cannot be used for reversible H2 storage due to its inherent high adsorption energy. The Sc/4ND-CNxNT possesses favorable adsorption and consecutive adsorption energy at the local-density approximation (LDA) and GGA level. Molecular dynamics (MD) study confirmed that the interaction between molecular hydrogen and 4ND-CNxNT decorated with scandium is indeed favorable. Simulations indicate that the total amount of adsorption is directly related to the operating temperature and pressure. The number of absorbed hydrogen molecules almost logarithmically increases as the pressure increases at a given temperature. The total excess adsorption of hydrogen on the (Sc/4ND)10-CNxNT arrays at 300 K is within the range set by the department of energy (DOE) with a value of at least 5.85 wt%.

  12. Lithium scandium phosphate-based electrolytes for solid state lithium rechargeable microbatteries

    Energy Technology Data Exchange (ETDEWEB)

    Amatucci, G.G. (Dept. of Ceramics, Rutgers Univ., Piscataway, NJ (United States)); Safari, A. (Dept. of Ceramics, Rutgers Univ., Piscataway, NJ (United States)); Shokoohi, F.K. (Bellcore, Red Bank, NJ (United States)); Wilkens, B.J. (Bellcore, Red Bank, NJ (United States))

    1993-04-01

    Li[sub 3]Sc[sub 2](PO[sub 4])[sub 3] is a promising candidate for use as an electrolyte in solid state lithium rechargeable microbatteries due to its stability in air, ease of preparation, and resistance to dielectric breakdown. The room temperature ionic conductivity was optimized resulting in an increase of over two orders of magnitude to 3 x 10[sup -6] S/cm. The formation of Li[sub 3](Sc[sub 2-x]M[sub x])(PO[sub 4])[sub 3], where M=Al[sup 3+] of Y[sup 3+], resulted in the decrease of porosity, greater sinterability, and considerable enhancement of the ionic conductivity. Yttrium substitutions enhanced the conductivity slightly while aluminum increased the room temperature ionic conductivity to 1.5 x 10[sup -5] S/cm for x=0.4. Preliminary electron beam evaporation of Li[sub 3]Sc[sub 2](PO[sub 4])[sub 3] yielded amorphous thin films with ionic conductivity as high as 5 x 10[sup -5] S/cm and a composition of Li[sub 4.8]Sc[sub 1.4](PO[sub 4])[sub 3]. (orig.)

  13. Effects of scandium addition on iron-bearing phases and tensile properties of Al–7Si–0.6Mg alloys

    Energy Technology Data Exchange (ETDEWEB)

    Tzeng, Yu-Chih [Department of Mechanical Engineering, National Central University, Jhongli, Taiwan (China); Wu, Chih-Ting [Department of Vehicle Engineering, Army Academy R.O.C., Jhongli, Taiwan (China); Bor, Hui-Yun; Horng, Jain-Long; Tsai, Mu-Lin [Department of Mechanical Engineering, National Central University, Jhongli, Taiwan (China); Institute of Materials Science and Engineering, National Central University, Jhongli, Taiwan (China); Lee, Sheng-Long, E-mail: shenglon@cc.ncu.edu.tw [Department of Mechanical Engineering, National Central University, Jhongli, Taiwan (China); Institute of Materials Science and Engineering, National Central University, Jhongli, Taiwan (China)

    2014-01-21

    Iron is the most deleterious impurity in aluminum alloys and can easily combine with aluminum to form an acicular β-Al{sub 5}FeSi phase that reduces ductility during the solidification of the molten metal. Adding scandium (Sc) to Al–7Si–0.6Mg alloys can transform the acicular β-Al{sub 5}FeSi phase into a comparatively harmless nodular Sc–Fe phase (Al{sub 12}Si{sub 6}Fe{sub 2}(Mg,Sc){sub 5}). This Sc–Fe phase has a lower hardness and elastic modulus than the β-Al{sub 5}FeSi phase; it is thus less likely to initiate cracks in the Al matrix. Moreover, the nodular Sc–Fe phase can improve the fluidity of Al during solidification, reducing interdendritic shrinkage. Tensile testing measurements showed that the elongation of Al–7Si–0.6Mg alloys with 0.04 and 0.12 wt% Sc can be respectively increased by 115% and 110% compared to Al–7Si–0.6Mg without Sc. The corresponding quality indices are increased by 17% and 19%, respectively, suggesting that the tensile properties of Al–7Si–0.6Mg alloys can be enhanced by adding scandium.

  14. Separation of (44)Ti from proton irradiated scandium by using solid-phase extraction chromatography and design of (44)Ti/(44)Sc generator system.

    Science.gov (United States)

    Radchenko, V; Meyer, C A L; Engle, J W; Naranjo, C M; Unc, G A; Mastren, T; Brugh, M; Birnbaum, E R; John, K D; Nortier, F M; Fassbender, M E

    2016-12-16

    Scandium-44g (half-life 3.97h [1]) shows promise for positron emission tomography (PET) imaging of longer biological processes than that of the current gold standard, (18)F, due to its favorable decay parameters. One source of (44g)Sc is the long-lived parent nuclide (44)Ti (half-life 60.0 a). A (44)Ti/(44g)Sc generator would have the ability to provide radionuclidically pure (44g)Sc on a daily basis. The production of (44)Ti via the (45)Sc(p,2n) reaction requires high proton beam currents and long irradiation times. Recovery and purification of no-carrier added (nca) (44)Ti from scandium metal targets involves complex separation chemistry. In this study, separation systems based on solid phase extraction chromatography were investigated, including branched diglycolamide (BDGA) resin and hydroxamate based ZR resin. Results indicate that ZR resin in HCl media represents an effective (44)Ti/(44g)Sc separation system. Copyright © 2016 Elsevier B.V. All rights reserved.

  15. Structures and H2 adsorption properties of porous scandium metal-organic frameworks.

    Science.gov (United States)

    Ibarra, Ilich A; Lin, Xiang; Yang, Sihai; Blake, Alexander J; Walker, Gavin S; Barnett, Sarah A; Allan, David R; Champness, Neil R; Hubberstey, Peter; Schröder, Martin

    2010-12-10

    Two new three-dimensional Sc(III) metal-organic frameworks {[Sc(3)O(L(1))(3)(H(2)O)(3)]·Cl(0.5)(OH)(0.5)(DMF)(4)(H(2)O)(3)}(∞) (1) (H(2)L(1)=1,4-benzene-dicarboxylic acid) and {[Sc(3)O(L(2))(2)(H(2)O)(3)](OH)(H(2)O)(5)(DMF)}(∞) (2) (H(3)L(2)=1,3,5-tris(4-carboxyphenyl)benzene) have been synthesised and characterised. The structures of both 1 and 2 incorporate the trinuclear trigonal planar [Sc(3)(O)(O(2)CR)(6)] building block featuring three Sc(III) centres joined by a central μ(3)-O(2-) donor. Each Sc(III) centre is further bound by four oxygen donors from four different bridging carboxylate anions, and a molecule of water located trans to the μ(3)-O(2-) donor completes the six coordination at the metal centre. Frameworks 1 and 2 show high thermal stability with retention of crystallinity up to 350 °C. The desolvated materials 1a and 2a, in which the solvent has been removed from the pores but with water or hydroxide remaining coordinated to Sc(III), show BET surface areas based upon N(2) uptake of 634 and 1233 m(2) g(-1), respectively, and pore volumes calculated from the maximum N(2) adsorption of 0.25 cm(3) g(-1) and 0.62 cm(3) g(-1), respectively. At 20 bar and 78 K, the H(2) isotherms for desolvated 1a and 2a confirm 2.48 and 1.99 wt% total H(2) uptake, respectively. The isosteric heats of adsorption were estimated to be 5.25 and 2.59 kJ mol(-1) at zero surface coverage for 1a and 2a, respectively. Treatment of 2 with acetone followed by thermal desolvation in vacuo generated free metal coordination sites in a new material 2b. Framework 2b shows an enhanced BET surface area of 1511 m(2) g(-1) and a pore volume of 0.76 cm(3) g(-1), with improved H(2) uptake capacity and a higher heat of H(2) adsorption. At 20 bar, H(2) capacity increases from 1.99 wt% in 2a to 2.64 wt% for 2b, and the H(2) adsorption enthalpy rises markedly from 2.59 to 6.90 kJ mol(-1).

  16. Gd-Sc-based mixed-metal nitride cluster fullerenes: mutual influence of the cage and cluster size and the role of scandium in the electronic structure.

    Science.gov (United States)

    Svitova, Anna L; Popov, Alexey A; Dunsch, Lothar

    2013-03-18

    The influence of the cage as well as of the cluster size has been studied in Gd-Sc nitride cluster fullerenes, which have been synthesized and isolated for these studies. A series of carbon cages ranging from C78 to C88 have been synthesized, isolated, and characterized in detail using absorption and vibrational spectroscopy as well as electrochemistry and density functional theory calculations. Gd-Sc mixed-metal cluster fullerenes in carbon cages different from C80 were described for the first time. A review of their structures, properties, and stability is given. The synthesis was performed with melamine as an effective solid source of nitrogen, providing high fullerene yield and suppressing empty fullerene formation. Substitution of gadolinium by scandium imposes a noticeable influence on the electronic structure of nitride cluster fullerenes as revealed by electrochemical, spectroscopic, and computational methods.

  17. Copper scandium zirconium phosphate

    DEFF Research Database (Denmark)

    Bond, Andrew David; Warner, Terence Edwin

    2013-01-01

    components. The [Sc(III)Zr(IV)(PO(4))(3)](2-) framework is composed of corner-sharing Sc/ZrO(6) octahedra and PO(4) tetrahedra. The Sc and Zr atoms are disordered on one atomic site on a crystallographic threefold axis. The P atom of the phosphate group lies on a crystallographic twofold axis. Nonframework...

  18. Synthesis and characterization of reduced scandium halide containing one- and two-dimensional metal bonded arrays. [Sc--ScCl3; Cs3Sc2Cl9; CsScCl3

    Energy Technology Data Exchange (ETDEWEB)

    Poeppelmeier, K.R.

    1978-08-01

    The stabilization effect of metal-metal bond formation on reduced scandium compounds was studied. The binary compounds Sc/sub 7/Cl/sub 12/, Sc/sub 5/Cl/sub 8/, Sc/sub 7/Cl/sub 10/ and ScCl were prepared by high temperature techniques and were characterized by single crystal x-ray diffraction. The respective metal arrays in these compounds can be viewed as fragments of scandium metal ranging from discrete six atom metal cluster species (Sc(Sc/sub 6/Cl/sub 12/)), through intermediate single and double infinite chain configurations ((ScCl/sub 2/)(Sc/sub 4/Cl/sub 6/)) and ((ScCl/sub 2/)(Sc/sub 6/Cl/sub 8/)) to double metal close-packed sheets (ScCl). The halogen atoms effectively isolate the clusters, chains and sheets by bonding face, edge or exo positions on the metal arrays. The common occurrence of isolated scandium (III) ions emphasizes that a minimum number of bonding electrons is required to stabilize what are formally anionic metal arrays. The distribution of the reduction electrons in these anisotropic materials was studied by magnetic susceptibility, EPR and uv-X photoelectron spectroscopy. The ternary compounds studied were Cs/sub 3/Sc/sub 2/Cl/sub 9/ and CsScCl/sub 3/. The anion-bridged metal chain of the hexagonal perovskite structure was found to stabilize scandium (II). CsScCl/sub 3/ was found to be grossly nonstoichiometric on the transition metal site and the effects of the mixed valence character were studied between the single valence extremes Cs/sub 3/Sc/sub 2 + x/Cl/sub 9/; 0< x < 1.0.

  19. Scandium functionalized carbon aerogel: Synthesis of nanoparticles and structure of a new ScOCl and properties of NaAlH{sub 4} as a function of pore size

    Energy Technology Data Exchange (ETDEWEB)

    Javadian, Payam; Nielsen, Thomas K. [Center for Energy Materials, Interdisciplinary Nanoscience Center (iNANO), and Department of Chemistry, Aarhus University, DK-8000 Aarhus (Denmark); Ravnsbæk, Dorthe B. [Department of Material Science and Engineering, Massachusetts Institute of Technology, 77 Massachusetts Avenue, Cambridge 02142, MA (United States); Jepsen, Lars H. [Center for Energy Materials, Interdisciplinary Nanoscience Center (iNANO), and Department of Chemistry, Aarhus University, DK-8000 Aarhus (Denmark); Polanski, Marek [Faculty of Advanced Technology and Chemistry, Military University of Technology, 2 Kaliskiego Str., 00-908 Warsaw (Poland); Plocinski, Tomasz [Faculty of Material Science and Engineering, Warsaw University of Technology, 144 Woloska Str., 02-507 Warsaw (Poland); Kunce, Izabela [Faculty of Advanced Technology and Chemistry, Military University of Technology, 2 Kaliskiego Str., 00-908 Warsaw (Poland); Besenbacher, Flemming [Interdisciplinary Nanoscience Center (iNANO) and Department of Physics and Astronomy, Aarhus University, DK-8000 Aarhus C (Denmark); Bystrzycki, Jerzy [Faculty of Advanced Technology and Chemistry, Military University of Technology, 2 Kaliskiego Str., 00-908 Warsaw (Poland); Jensen, Torben R., E-mail: trj@chem.au.dk [Center for Energy Materials, Interdisciplinary Nanoscience Center (iNANO), and Department of Chemistry, Aarhus University, DK-8000 Aarhus (Denmark)

    2015-11-15

    A new method for scandium-functionalization of carbon aerogels forming nanoparticles of a new scandiumoxochloride, ScOCl is presented. Sodium aluminiumhydride, NaAlH{sub 4}, is successfully melt infiltrated into the nano porous scaffolds with pore sizes of D{sub max}=7, 10, 13, 21, 26 and 39 nm, containing scandium based nano particles (<2.9 wt%) confirmed by elemental analysis and scanning electron microscopy. A systematic study of hydrogen storage properties of the nano composite materials is presented. An aqueous solution of ScCl{sub 3} was initially infiltrated and formed nanoconfined [Sc(OH)(H{sub 2}O){sub 5}]{sub 2}Cl{sub 4}(H{sub 2}O){sub 2}, which transforms to nanoparticles of a new scandium oxochloride, ScOCl at 192 °C and to Sc{sub 2}O{sub 3} at 420 °C. ScOCl crystallizes in an orthorhombic unit cell a=3.4409(8), b=3.9613(6) and c=8.178(2) Å, space group Pmmn, and is built from layers of [ScO{sub 4}Cl{sub 2}] octahedra forming neutral ScOCl layers. Temperature programmed desorption mass spectroscopy shows slightly improved kinetics for release of hydrogen with decreasing pore size. Continuous cycling of hydrogen release and uptake measured by the Sieverts' method reveal a larger preserved hydrogen storage capacity for scandium-functionalized aerogel with the larger pores (39 nm). - Highlights: • New synthesis approach for nanoporous Sc-functionalization carbon aerogel (Sc-CA). • The new scandium oxochloride, ScOCl, structure is obtained. • NaAlH{sub 4} nanoconfined in Sc-CA with pores ranging between 7 nm

  20. The use of the erbium, chromium:yttrium-scandium-gallium-garnet laser in endodontic treatment: the results of an in vitro study.

    Science.gov (United States)

    Schoop, Ulrich; Goharkhay, Kawe; Klimscha, Johannes; Zagler, Manuela; Wernisch, Johann; Georgopoulos, Apostolos; Sperr, Wolfgang; Moritz, Andreas

    2007-07-01

    The use of the erbium, chromium:yttrium-scandium-gallium-garnet (Er,Cr:YSGG) laser has become accepted in the field of cavity preparation. The development of miniaturized and flexible fiber tips has allowed this device to be used in endodontics. The authors conducted an in vitro study to assess the effects of Er,Cr:YSGG laser irradiation on root canals. The authors inoculated root canals with two bacteria, laser irradiated them at two power settings and subjected them to a quantitative microbiological evaluation. They used scanning electron microscopy (SEM) to assess morphological changes in endodontically processed and laser-irradiated root canal walls. They measured temperature increases on the root surface to determine possible thermal side effects. The bacteriological evaluation revealed a disinfecting effect in the root dentin samples that was dependent on the output power but not specific for the bacterial species investigated. SEM showed the removal of the smear layer from the root canal walls and the exposure of dentinal tubules. The temperature rise during irradiation was moderate when standardized power settings were used. The Er,Cr:YSGG laser can be used to eliminate bacteria in root canals. It also effectively removes smear layer and debris from the canal wall. Practitioners can use the Er,Cr:YSGG laser to prepare root canals for endodontic therapy.

  1. Aluminum-Scandium Alloys: Material Characterization, Friction Stir Welding, and Compatibility With Hydrogen Peroxide (MSFC Center Director's Discretionary Fund Final Report, Proj. No. 04-14)

    Science.gov (United States)

    Lee, J. A.; Chen, P. S.

    2004-01-01

    This Technical Memorandum describes the development of several high-strength aluminum (Al) alloys that are compatible with hydrogen peroxide (H2O2) propellant for NASA Hypersonic-X (Hyper-X) vehicles fuel tanks and structures. The yield strengths for some of these Al-magnesium-based alloys are more than 3 times stronger than the conventional 5254-H112 Al alloy, while maintaining excellent H2O2 compatibility similar to class 1 5254 alloy. The alloy development strategy is to add scandium, zirconium, and other transitional metals with unique electrochemical properties, which will not act as catalysts, to decompose the highly concentrated 90 percent H2O2. Test coupons are machined from sheet metals for H2O2 long-term exposure testing and mechanical properties testing. In addition, the ability to weld the new alloys using friction stir welding has also been explored. The new high-strength alloys could represent an enabling material technology for Hyper-X vehicles, where flight weight reduction is a critical requirement.

  2. High-fluence and high-density treatment of perioral rhytides using a new, fractionated 2,790-nm ablative erbium-doped Yttrium Scandium Gallium Garnet Laser.

    Science.gov (United States)

    Ciocon, David H; Hussain, Mussarat; Goldberg, David J

    2011-06-01

    In this study, we evaluated the safety and efficacy of a novel 2,790-nm erbium-doped yttrium scandium gallium garnet (Er:YSGG) laser system for the treatment of facial photodamage and perioral wrinkles using a single-treatment, high-fluence, high-density protocol. Eleven female participants with Fitzpatrick skin types II to III and facial wrinkles underwent a single full-face fractional ablative treatment with a 2,790-nm Er:YSGG laser. Follow-up visits were completed at 1, 2, and 6 weeks 3 and 6 months. Quartile improvement scale (0-4) and Fitzpatrick wrinkle scores (1-9) were used for the assessments. Based on blinded photographic assessments, the mean difference in Fitzpatrick wrinkle scores for full face wrinkles was 1.5 ± 1.2 (a reduction from 6.6 to 5.1; paired t-test, p = .003). There was also a statistically significant mean reduction of 1.7 ± 1.3 in perioral wrinkle scores (from 6.7 to 5.0; p = .002). No serious adverse events were reported. A novel, fractionated, ablative 2,790-nm Er:YSGG laser can safely and effectively treat photodamage and perioral wrinkles in a single treatment using a high-fluence, high-density protocol. Cutera provided the equipment used in this study and funding to Dr. Goldberg. © 2011 by the American Society for Dermatologic Surgery, Inc.

  3. Impact of layer and substrate properties on the surface acoustic wave velocity in scandium doped aluminum nitride based SAW devices on sapphire

    Energy Technology Data Exchange (ETDEWEB)

    Gillinger, M., E-mail: manuel.gillinger@tuwien.ac.at; Knobloch, T.; Schneider, M.; Schmid, U. [Institute of Sensor and Actuator Systems, TU Wien, 1040 Vienna (Austria); Shaposhnikov, K.; Kaltenbacher, M. [Institute of Mechanics and Mechatronics, TU Wien, 1040 Vienna (Austria)

    2016-06-06

    This paper investigates the performance of surface acoustic wave (SAW) devices consisting of reactively sputter deposited scandium doped aluminum nitride (Sc{sub x}Al{sub 1-x}N) thin films as piezoelectric layers on sapphire substrates for wireless sensor or for RF-MEMS applications. To investigate the influence of piezoelectric film thickness on the device properties, samples with thickness ranging from 500 nm up to 3000 nm are fabricated. S{sub 21} measurements and simulations demonstrate that the phase velocity is predominantly influenced by the mass density of the electrode material rather than by the thickness of the piezoelectric film. Additionally, the wave propagation direction is varied by rotating the interdigital transducer structures with respect to the crystal orientation of the substrate. The phase velocity is about 2.5% higher for a-direction compared to m-direction of the sapphire substrate, which is in excellent agreement with the difference in the anisotropic Young's modulus of the substrate corresponding to these directions.

  4. Structure and temperature effects on Nd3+ spectra in polycrystalline mixed scandium aluminum garnets Y3ScxAl5-xO12

    Science.gov (United States)

    Lupei, A.; Lupei, V.; Hau, S.; Gheorghe, C.; Voicu, F.

    2015-09-01

    New spectroscopic data obtained from high resolution low temperature absorption and emission spectra of Nd3+ in mixed scandium aluminum garnets Y3ScxAl5-xO12 - (x = 0-2) translucent ceramics revealed transition dependent composition effects: modification of the shapes (Lorentz at x = 0 and 2, quasi-Gauss at x = 1, x-dependent asymmetric for other x values, with obvious multicenter structure for low x), widths and shifts of the lines. Nd3+ electronic structure dependence on structural changes with composition is analyzed in terms of nephelauxetic effect and maximum splitting of manifolds: Sc3+ co-doping reduces the nephelauxetic effect, and the increase of 4F3/2 splitting from 85 cm-1 (x = 0) to 98 cm-1 (x = 2) denotes the lowering of local symmetry. The multicenter structure and inhomogeneous broadening of Nd3+ lines is attributed to crystal field distributions determined by the random occupancy of the octahedral sites by Sc3+ and Al3+. For low x (0.2) the resolved two satellites S1, S2 that accompany Nd:YAG lines are correlated to anisotropic crystal field perturbations produced by the n.n. Sc3+ by analogy to those determined by Y3+-antisites (excess of Y3+ ions that enter in octahedral sites of the melt-grown YAG crystals). The temperature evolution of the Nd3+ spectral characteristics (line intensity, shift, broadening) in the 10-300 K range is analyzed in terms of thermal population of the Stark levels, of the effect on electron-phonon interaction and on lattice expansion. The relevance of the spectroscopic properties on the laser emission characteristics in these systems is discussed.

  5. Dissolved scandium, yttrium, and lanthanum in the surface waters of the North Atlantic: Potential use as an indicator of scavenging intensity

    Science.gov (United States)

    Till, C. P.; Shelley, R. U.; Landing, W. M.; Bruland, K. W.

    2017-08-01

    Recent work has begun to elucidate the biogeochemical cycling of scandium (Sc) in the open ocean, but so far no surface distribution data have been reported of dissolved Sc, and no basin-scale surface distributions have been reported of yttrium (Y) or lanthanum (La). This work presents basin-wide surface Sc, Y, and La data in a section across the North Atlantic subtropical gyre (2011 GEOTRACES GA03) and investigates the potential utility of these distributions. This work uses dissolved and aerosol concentration data for La and Sc to estimate their surface ocean residence times in both the center of the oligotrophic gyre and near the African coastline. This work additionally shows that the surface distribution of Sc in the North Atlantic correlates with the shape of the gyre as inferred by isotherm depth, with lower Sc concentrations at the gyre boundaries. This pattern suggests that Sc could be drawn down by the elevated particle flux at the gyre boundaries. In this case, Sc removal could be used as an indicator of scavenging intensity. In order to account for variable input of Sc to the surface ocean, we propose normalizing the Sc distribution to that of Y or La, which are much less particle reactive and are input via dust to the surface North Atlantic in constant ratios with Sc. Such normalization improves the correlation with isotherm depth. We propose that the variations in dissolved Y/Sc and La/Sc ratios may be due to preferential Sc scavenging and could therefore indicate scavenging intensity.

  6. On new ternary equiatomic scandium transition metal aluminum compounds ScTAl with T = Cr, Ru, Ag, Re, Pt, and Au

    Energy Technology Data Exchange (ETDEWEB)

    Radzieowski, Mathis; Janka, Oliver [Muenster Univ. (Germany). Inst. fuer Anorganische und Analytische Chemie; Benndorf, Christopher [Muenster Univ. (Germany). Inst. fuer Anorganische und Analytische Chemie; Muenster Univ. (Germany). Inst. fuer Physikalische Chemie; Haverkamp, Sandra [Muenster Univ. (Germany). Inst. fuer Physikalische Chemie; Eckert, Hellmut [Muenster Univ. (Germany). Inst. fuer Physikalische Chemie; University of Sao Paulo, Sao Carlos, SP (Brazil). Inst. of Physics

    2016-08-01

    The new equiatomic scandium transition metal aluminides ScTAl for T = Cr, Ru, Ag, Re, Pt, and Au were obtained by arc-melting of the elements followed by subsequent annealing for crystal growth. The samples were studied by powder and single crystal X-ray diffraction. The structures of three compounds were refined from single crystal X-ray diffractometer data: ScCrAl, MgZn{sub 2} type, P6{sub 3}/mmc, a = 525.77(3), c = 858.68(5) pm, R{sub 1} = 0.0188, wR{sub 2} = 0.0485, 204 F{sup 2} values, 13 variables, ScPtAl, TiNiSi type, Pnma, a = 642.83(4), b = 428.96(2), c = 754.54(5) pm, R{sub 1} = 0.0326, wR{sub 2} = 0.0458, 448 F{sup 2} values, 20 variables and ScAuAl, HfRhSn type, P anti 62c, a = 722.88(4), c = 724.15(4) pm, R{sub 1} = 0.0316, wR{sub 2} = 0.0653, 512 F{sup 2} values, 18 variables. Phase pure samples of all compounds were furthermore investigated by magnetic susceptibility measurements, and Pauli-paramagnetism but no superconductivity was observed down to 2.1 K for all of them. The local structural features and disordering phenomena have been characterized by {sup 27}Al and {sup 45}Sc magic angle spinning (MAS) and static NMR spectroscopic investigations.

  7. Treatment of infraorbital dark circles in atopic dermatitis with a 2790-nm erbium: yttrium scandium gallium garnet laser: a pilot study.

    Science.gov (United States)

    Park, Kui Young; Oh, In Young; Moon, Nam Ju; Seo, Seong Jun

    2013-04-01

    Although many Asian atopic patients have orbital darkening symptom and the demand to treat this condition is increasing, little has been reported in the literature on the treatment of infraorbital dark circles in atopic dermatitis. To evaluate the clinical efficacy and safety of 2790-nm erbium:yttrium scandium gallium garnet (Er:YSGG) laser therapy for reducing infraorbital dark circles in atopic dermatitis patients. Ten Korean patients over 21 year with mild atopic dermatitis and infraorbital dark circles were enrolled in this study. Patients who need active atopic dermatitis treatments are excluded because of the possibility of aggravation after laser treatment. They were treated for dark circles using a 2790-nm Er:YSGG laser. The treatment parameters were 1.8-2.2 J/cm² fluence, 6-mm spot size, and 0.3-ms pulse width with 10% overlap over the infraorbital areas once with a 4-week interval between treatments. Efficacy was assessed with a quartile grading score ranging from 0 to 5 by a blinded investigator, and the patients also documented their degree of satisfaction with the same grading score. All possible side effects were evaluated. The clinical assessment showed 74.5% (2.7) and 72.5% (2.5) improvements, and the patient satisfaction scale scores improved an average of 74% (2.4) and 71.5% (2.3) at 2 months and 4 months after treatment, respectively. There were no severe side effects or aggravation of atopic dermatitis. Our study suggests that 2790-nm Er:YSGG laser therapy can be effectively and safely used in the treatment of infraorbital dark circles in atopic dermatitis patients.

  8. The influence of cation ordering, oxygen vacancy distribution and proton siting on observed properties in ceramic electrolytes: the case of scandium substituted barium titanate.

    Science.gov (United States)

    Torino, Nico; Henry, Paul F; Knee, Christopher S; Bjørheim, Tor Svendsen; Rahman, Seikh M H; Suard, Emma; Giacobbe, Carlotta; Eriksson, Sten G

    2017-07-04

    The origin of the 2-order of magnitude difference in the proton conductivity of the hydrated forms of hexagonal and cubic oxygen deficient BaScxTi1-xO3-δ (x = 0.2 and x = 0.7) was probed using a combination of neutron diffraction and density functional theory techniques to support published X-ray diffraction, conductivity, thermogravimetric and differential scanning calorimetry studies. Cation ordering is found in the 6H structure type (space group P63/mmc) adopted by BaSc0.2Ti0.8O3-δ with scandium preferentially substituting in the vertex sharing octahedra (2a crystallographic site) and avoiding the face-sharing octahedra (4f site). This is coupled with oxygen vacancy ordering in the central plane of the face-sharing octahedra (O1 site). In BaSc0.7Ti0.3O3-δ a simple cubic perovskite (space group Pm3[combining macron]m) best represents the average structure from Rietveld analysis with no evidence of either cation ordering or oxygen vacancy ordering. Significant diffuse scattering is observed, indicative of local order. Hydration in both cases leads to complete filling of the available oxygen vacancies and permits definition of the proton sites. We suggest that the more localised nature of the proton sites in the 6H structure is responsible for the significantly lower proton conduction observed in the literature. Within the 6H structure type final model, proton diffusion requires a 3-step process via higher energy proton sites that are unoccupied at room temperature and is also likely to be anisotropic whereas the highly disordered cubic perovskite proton position allows 3-dimensional diffusion by well-described modes. Finally, we propose how this knowledge can be used to further materials design for ceramic electrolytes for proton conducting fuel cells.

  9. 48 CFR 48.001 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 48.001 Section 48.001 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... means agency costs of operation, maintenance logistic support, or Government-furnished property...

  10. Effects of erbium-and chromium-doped yttrium scandium gallium garnet and diode lasers on the surfaces of restorative dental materials: a scanning electron microscope study.

    Science.gov (United States)

    Hatipoglu, M; Barutcigil, C

    2015-01-01

    The aim of this study is to evaluate the potential effects of laser irradiation, which is commonly performed in periodontal surgery, on the surfaces of restorative materials. Five different restorative dental materials were used in this study, as follows: (1) Resin composite, (2) poly acid-modified resin composite (compomer), (3) conventional glass ionomer cement (GIC), (4) resin-modified glass ionomer cement (RMGIC), and (5) amalgam. Four cylindrical samples (8 mm diameter, 2 mm height) were prepared for each restorative material. In addition, four freshly extracted, sound human incisors teeth were selected. Two different laser systems commonly used in periodontal surgery were examined in this study: A 810 nm diode laser at a setting of 1 W with continuous-phase laser irradiation for 10 s, and an erbium-and chromium-doped yttrium scandium gallium garnet (Er, Cr: YSGG) laser at settings of 2.5 W, 3.25 W, and 4 W with 25 Hz laser irradiation for 10 s. Scanning electron microscopy (SEM) analysis was performed to evaluate the morphology and surface deformation of the restorative materials and tooth surfaces. According to the SEM images, the Er, Cr: YSGG laser causes irradiation markings that appear as demineralized surfaces on tooth samples. The Er, Cr: YSGG laser also caused deep defects on composite, compomer, and RMGIC surfaces because of its high power, and the ablation was deeper for these samples. High-magnification SEM images of GIC samples showed the melting and combustion effects of the Er, Cr: YSGG laser, which increased as the laser power was increased. In amalgam samples, neither laser left significant harmful effects at the lowest power setting. The diode laser did cause irradiation markings, but they were insignificant compared with those left by the Er, Cr: YSGG laser on the surfaces of the different materials and teeth. Within the limitations of this study, it can be concluded that Er, Cr: YSGG laser irradiation could cause distortions of the surfaces

  11. 48 CFR 48.102 - Policies.

    Science.gov (United States)

    2010-10-01

    ... financial risk). (4) Development cost. (5) Performance and/or reliability impact. (6) Production period... 48.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT VALUE ENGINEERING Policies and Procedures 48.102 Policies. (a) As required by Section 36 of the Office...

  12. SAFETY INSTRUCTION NO 48 (IS48)

    CERN Multimedia

    TIS Secretariat

    2001-01-01

    Please note that the Safety Instruction no 48 (IS48) entitled 'FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS' is available on the web at the following url: Fire Prevention Paper copies can also be obtained from the TIS Divisional Secretariat, email Tis.Secretariat@cern.ch.

  13. SAFETY INSTRUCTION NO 48 (IS48)

    CERN Multimedia

    TIS Secretariat

    2001-01-01

    Please note that the Safety Instruction no 48 (IS48) entitled 'FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS'   is available on the web at the following url: Fire Prevention Paper copies can also be obtained from the TIS Divisional Secretariat, email Tis.Secretariat@cern.ch.

  14. Influence of c-axis orientation and scandium concentration on infrared active modes of magnetron sputtered Sc{sub x}Al{sub 1−x}N thin films

    Energy Technology Data Exchange (ETDEWEB)

    Mayrhofer, P. M.; Bittner, A.; Schmid, U. [Institute of Sensor and Actuator Systems, Vienna University of Technology, Floragasse 7, 1040 Vienna (Austria); Eisenmenger-Sittner, C. [Institute of Solid State Physics, Vienna University of Technology, Wiedner Hauptstrasse 8, 1040 Vienna (Austria); Euchner, H. [Institute of Materials Science and Technology, Vienna University of Technology, Karlsplatz 13, 1040 Vienna (Austria)

    2013-12-16

    Doping of wurtzite aluminium nitride (AlN) with scandium (Sc) significantly enhances the piezoelectric properties of AlN. Sc{sub x}Al{sub 1−x}N thin films with different Sc concentrations (x = 0 to 0.15) were deposited by DC reactive magnetron sputtering. Infrared (IR) absorbance spectroscopy was applied to investigate the Sc concentration dependent shift of the IR active modes E{sub 1}(TO) and A{sub 1}(TO). These results are compared to ab initio simulations, being in excellent agreement with the experimental findings. In addition, IR spectroscopy is established as an economical and fast method to distinguish between thin films with a high degree of c-axis orientation and those exhibiting mixed orientations.

  15. Two scandium-biuret complexes: [Sc(C2H5N3O2)(H2O)5]Cl3 x H2O and [Sc(C2H5N3O2)4](NO3)3.

    Science.gov (United States)

    Harrison, William T A

    2008-05-01

    The scandium(III) cations in the structures of pentaaqua(biuret-kappa(2)O,O')scandium(III) trichloride monohydrate, [Sc(C(2)H(5)N(3)O(2))(H(2)O)(5)]Cl(3) x H(2)O, (I), and tetrakis(biuret-kappa(2)O,O')scandium(III) trinitrate, [Sc(C(2)H(5)N(3)O(2))(4)](NO(3))(3), (II), are found to adopt very different coordinations with the same biuret ligand. The roles of hydrogen bonding and the counter-ion in the establishment of the structures are described. In (I), the Sc(3+) cation adopts a fairly regular pentagonal bipyramidal coordination geometry arising from one O,O'-bidentate biuret molecule and five water molecules. A dense network of N-H...Cl, O-H...O and O-H...Cl hydrogen bonds help to establish the packing, resulting in dimeric associations of two cations and two water molecules. In (II), the Sc(3+) cation (site symmetry 2) adopts a slightly squashed square-antiprismatic geometry arising from four O,O'-bidentate biuret molecules. A network of N-H...O hydrogen bonds help to establish the packing, which features [010] chains of cations. One of the nitrate ions is disordered about an inversion centre. Both structures form three-dimensional hydrogen-bond networks.

  16. NA48 prototype calorimeter

    CERN Multimedia

    1990-01-01

    This is a calorimeter, a detector which measures the energy of particles. When in use, it is filled with liquid krypton at -152°C. Electrons and photons passing through interact with the krypton, creating a shower of charged particles which are collected on the copper ribbons. The ribbons are aligned to an accuracy of a tenth of a millimetre. The folding at each end allows them to be kept absolutely flat. Each shower of particles also creates a signal in scintillating material embedded in the support disks. These flashes of light are transmitted to electronics by the optical fibres along the side of the detector. They give the time at which the interaction occurred. The photo shows the calorimeter at NA48, a CERN experiment which is trying to understand the lack of anti-matter in the Universe today.

  17. 26 CFR 48.0-1 - Introduction.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Introduction. 48.0-1 Section 48.0-1 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) MISCELLANEOUS EXCISE TAXES MANUFACTURERS AND RETAILERS EXCISE TAXES Introduction § 48.0-1 Introduction. The regulations in this part 48 are...

  18. Uganda Journal - Vol 48 (2002)

    African Journals Online (AJOL)

    Notes: Observations of Butterfly Migrations in Uganda, 2002 · EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. Ian Deshmukh, 111-114. http://dx.doi.org/10.4314/uj.v48i1.23007 ...

  19. No-Core Shell Model for 48-Ca, 48-Sc and 48-Ti

    Energy Technology Data Exchange (ETDEWEB)

    Popescu, S; Stoica, S; Vary, J P; Navratil, P

    2004-10-26

    The authors report the first no-core shell model results for {sup 48}Ca, {sup 48}Sc and {sup 48}Ti with derived and modified two-body Hamiltonians. We use an oscillator basis with a limited {bar h}{Omega} range around 40/A{sup 1/3} = 11 MeV and a limited model space up to 1 {bar h}{Omega}. No single-particle energies are used. They find that the charge dependence of the bulk binding energy of eight A = 48 nuclei is reasonably described with an effective Hamiltonian derived from the CD-Bonn interaction while there is an overall underbinding by about 0.4 MeV/nucleon. However, resulting spectra exhibit deficiencies that are anticipated due to: (1) basis space limitations and/or the absence of effective many-body interactions; and, (2) the absence of genuine three-nucleon interactions. They introduce phenomenological modifications to obtain fits to total binding and low-lying spectra. The resulting no-core shell model opens a path for applications to experiments such as the double-beta ({beta}{beta}) decay process.

  20. 38 CFR 48.655 - Individual.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Individual. 48.655...) GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Definitions § 48.655 Individual. Individual means a natural person. ...

  1. 32 CFR 48.501 - General information.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false General information. 48.501 Section 48.501 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE PERSONNEL, MILITARY AND CIVILIAN RETIRED SERVICEMAN'S FAMILY PROTECTION PLAN Annuity § 48.501 General information. Except as provided in...

  2. 21 CFR 211.48 - Plumbing.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Plumbing. 211.48 Section 211.48 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities § 211.48...

  3. 28 CFR 4.8 - Hearing.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Hearing. 4.8 Section 4.8 Judicial... OF 1974 § 4.8 Hearing. The hearing on the application shall be held at the offices of the Commision in Washington, DC, or elsewhere as the Commission may direct. The hearing shall be held before the...

  4. 32 CFR 48.602 - Organization.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Organization. 48.602 Section 48.602 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE PERSONNEL, MILITARY AND CIVILIAN RETIRED SERVICEMAN'S FAMILY PROTECTION PLAN Miscellaneous § 48.602 Organization. (a) The Joint Board for the Retired...

  5. 4 CFR 28.48 - Service.

    Science.gov (United States)

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Service. 28.48 Section 28.48 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES GOVERNMENT ACCOUNTABILITY OFFICE PERSONNEL APPEALS BOARD; PROCEDURES... Subpoenas § 28.48 Service. Service of a subpoena may be made by a United States Marshal or Deputy Marshal or...

  6. 25 CFR 213.48 - Effective date.

    Science.gov (United States)

    2010-04-01

    ... FIVE CIVILIZED TRIBES, OKLAHOMA, FOR MINING Removal of Restrictions § 213.48 Effective date. The regulations in this part shall become effective and in full force from and after the date of approval (Apr. 27... 25 Indians 1 2010-04-01 2010-04-01 false Effective date. 213.48 Section 213.48 Indians BUREAU OF...

  7. 7 CFR 3575.48 - Security.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Security. 3575.48 Section 3575.48 Agriculture... GENERAL Community Programs Guaranteed Loans § 3575.48 Security. (a) Lender responsibility. The lender is responsible for obtaining and maintaining proper and adequate security to protect the interest of the lender...

  8. 29 CFR 1917.48 - Conveyors.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Conveyors. 1917.48 Section 1917.48 Labor Regulations...) MARINE TERMINALS Cargo Handling Gear and Equipment § 1917.48 Conveyors. (a) Guards. (1) Danger zones at or adjacent to conveyors shall be guarded to protect employees. (2) An elevated walkway with...

  9. 36 CFR 9.48 - Performance bond.

    Science.gov (United States)

    2010-07-01

    ... Secretary or his designee, cash or negotiable bonds of the U.S. Government. The cash deposit or the market... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Performance bond. 9.48... MINERALS MANAGEMENT Non-Federal Oil and Gas Rights § 9.48 Performance bond. (a) Prior to approval of a plan...

  10. 48 CFR 3017.9000 - Clauses (USCG).

    Science.gov (United States)

    2010-10-01

    ... will involve, or is reasonably expected to involve, increased costs, such facts and the reasons for the... (HSAR) 48 CFR 3052.217-95(b)(6) and (c)(1) consistent with contract size, inflation, and other..., inflation, and other circumstances. (c) The clause at (HSAR) 48 CFR 3052.217-100, Guarantee, shall be used...

  11. 48 CFR 3001.7001 - Content.

    Science.gov (United States)

    2017-10-01

    ... 48 Federal Acquisition Regulations System 7 2017-10-01 2017-10-01 false Content. 3001.7001 Section 3001.7001 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY..., Exceptions, Approvals, Reviews, and Submittals 3001.7001 Content. The general format at (HSAR) 48 CFR 3001...

  12. 15 CFR 4.8 - Classified Information.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Classified Information. 4.8 Section 4... INFORMATION Freedom of Information Act § 4.8 Classified Information. In processing a request for information..., the information shall be reviewed to determine whether it should remain classified. Ordinarily the...

  13. 40 CFR 791.48 - Production volume.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Production volume. 791.48 Section 791... (CONTINUED) DATA REIMBURSEMENT Basis for Proposed Order § 791.48 Production volume. (a) Production volume.... (b) For the purpose of determining fair reimbursement shares, production volume shall include amounts...

  14. 48 CFR 3034.004 - Acquisition strategy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Acquisition strategy. 3034.004 Section 3034.004 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND... Acquisition strategy. See (HSAR) 48 CFR 3009.570 for policy applicable to acquisition strategies that consider...

  15. 48 CFR 1252.217-77 - Title.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Title. 1252.217-77 Section... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1252.217-77 Title. As prescribed at (TAR) 48 CFR 1217.7001(b) and (c), insert the following clause: Title (OCT 1994) (a) Unless otherwise...

  16. 48 CFR 1352.271-80 - Title.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Title. 1352.271-80 Section... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.271-80 Title. As prescribed in 48 CFR 1371.111, insert the following clause: Title (APR 2010) (a) Title to all materials and...

  17. 48 CFR 3001.7001 - Content.

    Science.gov (United States)

    2005-10-01

    ..., Exceptions, Approvals, Reviews, and Submittals 3001.7001 Content. The general format at (HSAR) 48 CFR 3001... 48 Federal Acquisition Regulations System 7 2005-10-01 2005-10-01 false Content. 3001.7001 Section 3001.7001 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY...

  18. 45 CFR 74.48 - Contract provisions.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Contract provisions. 74.48 Section 74.48 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award...

  19. 48 CFR 1352.271-76 - Performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance. 1352.271-76... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.271-76 Performance. As prescribed in 48 CFR 1371.107, insert the following clause: Performance (APR 2010) (a) The contractor shall...

  20. 48 CFR 1252.217-72 - Performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance. 1252.217-72... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1252.217-72 Performance. As prescribed at (TAR) 48 CFR 1217.7001(b) and (c), insert the following clause: Performance (OCT 1994) (a) Upon...

  1. 48 CFR 3001.7001 - Content.

    Science.gov (United States)

    2010-10-01

    ..., Exceptions, Approvals, Reviews, and Submittals 3001.7001 Content. The general format at (HSAR) 48 CFR 3001... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Content. 3001.7001 Section 3001.7001 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY...

  2. 38 CFR 48.670 - Suspension.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Suspension. 48.670...) GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Definitions § 48.670 Suspension. Suspension means an action taken by a Federal agency that immediately prohibits a recipient from...

  3. 7 CFR 929.48 - Sales history.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Sales history. 929.48 Section 929.48 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE CRANBERRIES GROWN IN STATES OF...

  4. 33 CFR 142.48 - Eyewash equipment.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Eyewash equipment. 142.48 Section... CONTINENTAL SHELF ACTIVITIES WORKPLACE SAFETY AND HEALTH Personal Protective Equipment § 142.48 Eyewash equipment. Portable or fixed eyewash equipment providing emergency relief must be immediately available near...

  5. 48 CFR 3052.228-70 - Insurance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Insurance. 3052.228-70... of Provisions and Clauses 3052.228-70 Insurance. As prescribed in (HSAR) 48 CFR 3028.310-70 and 3028... insurance. Insurance (DEC 2003) In accordance with the clause entitled “Insurance—Work on a Government...

  6. 48 CFR 970.2672-2 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Requirements. 970.2672-2... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Other Socioeconomic Programs 970.2672-2 Requirements. The requirements set forth in 48 CFR 926.71, Implementation of Section 3161 of the National Defense Authorization...

  7. 22 CFR 145.48 - Contract clauses.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Contract clauses. 145.48 Section 145.48 Foreign... contracts or subcontracts exceeding $100,000, the Department may accept the bonding policy and requirements... of making audits, examinations, excerpts and transcriptions. (e) All contracts, including small...

  8. TANK48 CFD MODELING ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.

    2011-05-17

    The process of recovering the waste in storage tanks at the Savannah River Site (SRS) typically requires mixing the contents of the tank to ensure uniformity of the discharge stream. Mixing is accomplished with one to four dual-nozzle slurry pumps located within the tank liquid. For the work, a Tank 48 simulation model with a maximum of four slurry pumps in operation has been developed to estimate flow patterns for efficient solid mixing. The modeling calculations were performed by using two modeling approaches. One approach is a single-phase Computational Fluid Dynamics (CFD) model to evaluate the flow patterns and qualitative mixing behaviors for a range of different modeling conditions since the model was previously benchmarked against the test results. The other is a two-phase CFD model to estimate solid concentrations in a quantitative way by solving the Eulerian governing equations for the continuous fluid and discrete solid phases over the entire fluid domain of Tank 48. The two-phase results should be considered as the preliminary scoping calculations since the model was not validated against the test results yet. A series of sensitivity calculations for different numbers of pumps and operating conditions has been performed to provide operational guidance for solids suspension and mixing in the tank. In the analysis, the pump was assumed to be stationary. Major solid obstructions including the pump housing, the pump columns, and the 82 inch central support column were included. The steady state and three-dimensional analyses with a two-equation turbulence model were performed with FLUENT{trademark} for the single-phase approach and CFX for the two-phase approach. Recommended operational guidance was developed assuming that local fluid velocity can be used as a measure of sludge suspension and spatial mixing under single-phase tank model. For quantitative analysis, a two-phase fluid-solid model was developed for the same modeling conditions as the single

  9. Safety assessment for TA-48 radiochemical operations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-08-01

    The purpose of this report is to document an assessment performed to evaluate the safety of the radiochemical operations conducted at the Los Alamos National Laboratory operations area designated as TA-48. This Safety Assessment for the TA-48 radiochemical operations was prepared to fulfill the requirements of US Department of Energy (DOE) Order 5481.1B, ``Safety Analysis and Review System.`` The area designated as TA-48 is operated by the Chemical Science and Technology (CST) Division and is involved with radiochemical operations associated with nuclear weapons testing, evaluation of samples collected from a variety of environmental sources, and nuclear medicine activities. This report documents a systematic evaluation of the hazards associated with the radiochemical operations that are conducted at TA-48. The accident analyses are limited to evaluation of the expected consequences associated with a few bounding accident scenarios that are selected as part of the hazard analysis. Section 2 of this report presents an executive summary and conclusions, Section 3 presents pertinent information concerning the TA-48 site and surrounding area, Section 4 presents a description of the TA-48 radiochemical operations, and Section 5 presents a description of the individual facilities. Section 6 of the report presents an evaluation of the hazards that are associated with the TA-48 operations and Section 7 presents a detailed analysis of selected accident scenarios.

  10. 48 CFR 4.501 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false 4.501 Section 4.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Electronic Commerce in Contracting 4.50...

  11. 48 CFR 19.808 - Contract negotiation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract negotiation. 19.808 Section 19.808 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC....808 Contract negotiation. ...

  12. 48 CFR 619.808 - Contract negotiation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract negotiation. 619.808 Section 619.808 Federal Acquisition Regulations System DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS... Contract negotiation. ...

  13. 48 CFR 245.607 - Scrap.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Scrap. 245.607 Section 245.607 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF... Inventory 245.607 Scrap. ...

  14. 48 CFR 970.3770 - Facilities management.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  15. 48 CFR 209.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Suspension. 209.407... OF DEFENSE ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 209.407 Suspension. ...

  16. 48 CFR 28.301 - Policy.

    Science.gov (United States)

    2010-10-01

    ... awarded nonpersonal services contracts for health care services are required to maintain medical liability... circumstances: (a)(1) The Government requires any contractor subject to Cost Accounting Standard (CAS) 416 (48...

  17. 38 CFR 48.640 - Employee.

    Science.gov (United States)

    2010-07-01

    ...) GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Definitions § 48.640 Employee. (a... payroll of the recipient (e.g., volunteers, even if used to meet a matching requirement; consultants or... workplaces). ...

  18. 48 CFR 1803.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Procurement integrity. 1803... ADMINISTRATION GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 1803.104 Procurement integrity. ...

  19. 48 CFR 203.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Procurement integrity. 203..., DEPARTMENT OF DEFENSE GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 203.104 Procurement integrity. ...

  20. 7 CFR 1779.48 - Collateral.

    Science.gov (United States)

    2010-01-01

    ... (CONTINUED) WATER AND WASTE DISPOSAL PROGRAMS GUARANTEED LOANS § 1779.48 Collateral. (a) Lender responsibility. The lender is responsible for obtaining and maintaining proper and adequate collateral to protect...

  1. 48 CFR 803.570 - Commercial advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Commercial advertising. 803.570 Section 803.570 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL... Commercial advertising. ...

  2. 48 CFR 215.404 - Proposal analysis.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Proposal analysis. 215.404 Section 215.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Proposal analysis. ...

  3. Make a movie in 48 hours

    CERN Multimedia

    Brokk Toggerson

    2011-01-01

    This year, the 48-hour film project (48hfp) returns to Geneva after a one-year hiatus. Organized by Neal Hartman and the CERN film-making club, Open Your Eyes Films, the 48hfp challenges teams of film-makers to write, shoot, soundtrack and edit a 4 to 7 minute film in 48 hours from 4 to 6 November.   At the start of the festival, contestants picked their film genre from a hat. The films will be screened on 8 and 9 November, with the awards presentation on the 9th. The winner will receive a trip to the US to compete in the international version of the competition. “There are so many short films being made now," says Hartman, “I think, however, that the 48hfp allows a critical creative mass to form. The result is that these 20 teams make 20 better films than if each participant were making their own." Each team draws a genre from a hat and is given a character, a prop and a line of dialogue that must appear in their film. The genres run the gamut from &am...

  4. Two-proton radioactivity of 48Ni

    Science.gov (United States)

    Miernik, Krzysztof

    2011-10-01

    In experiment performed at NSCL facility we studied the decay of extremely neutron deficient isotope of 48Ni. Ions were implanted into a gaseuos detector, the Optical Time Projection Chamber which allows to record tracks of charged particles. Six events of 48Ni were observed, the two-proton radioactivity (four events) and the β-decay (two events) channels were clearly indentified. The half-life of 48Ni is determined to be T1 / 2 = 2.1-0. 4 + 1 . 4 ms. The results of three-dimensional events reconstruction as well as comparison of results with theoretical models will be presented. Research performed as a Eugene P. Wigner Fellow and staff member at the Oak Ridge National Laboratory, managed by UT-Battelle, LLC, for the U.S. Department of Energy under Contract DE-AC05-00OR22725.

  5. 26 CFR 48.4218-4 - Use in further manufacture.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Use in further manufacture. 48.4218-4 Section 48... Taxes Use by Manufacturer Or Importer Considered Sale § 48.4218-4 Use in further manufacture. For purposes of section 4218 and § 48.4218-1, an article is used as material in the manufacture or production...

  6. 26 CFR 48.4222(a)-1 - Registration.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Registration. 48.4222(a)-1 Section 48.4222(a)-1... TAXES MANUFACTURERS AND RETAILERS EXCISE TAXES Exemptions, Registration, Etc. § 48.4222(a)-1 Registration. (a) General rule. Except as provided in § 48.4222(b)-1, tax-free sales under section 4221 may be...

  7. 48 CFR 2110.7003 - Significant events.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Significant events. 2110..., AND OTHER PURCHASE DESCRIPTIONS Contract Specifications 2110.7003 Significant events. The contractor is required to inform the contracting officer of all significant events. ...

  8. 48 CFR 4.1301 - Policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Policy. 4.1301 Section 4.1301 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Personal Identity Verification 4.1301 Policy. (a) Agencies must follow FIPS PUB Number 201 and the...

  9. 48 CFR 4.1303 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clause. 4.1303 Section 4.1303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Personal Identity Verification 4.1303 Contract clause. The contracting officer shall...

  10. 48 CFR 970.2704-2 - Procedures.

    Science.gov (United States)

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2704-2 Procedures. (a... leverage to acquire rights in a subcontractor's limited rights data or restricted computer software for... computer software except through the use of Alternate II or III to the clause at 48 CFR 52.227-14...

  11. 48 CFR 1403.1004 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 1403.1004 Section 1403.1004 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Contractor Code of Business Ethics and Conduct 1403...

  12. 48 CFR 3.1001 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 3.1001 Section 3.1001 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Contractor Code of Business Ethics and Conduct 3.1001...

  13. 48 CFR 503.1004 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clauses. 503.1004 Section 503.1004 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Contractor Code of Business Ethics and Conduct 503...

  14. 48 CFR 423.405 - Procedures.

    Science.gov (United States)

    2010-10-01

    ... identified as recycled content when purchasing supplies or services. Information on EPA designated products... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Procedures. 423.405 Section 423.405 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS...

  15. 48 CFR 2001.303 - Public participation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Public participation. 2001.303 Section 2001.303 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION GENERAL... participation. FAR 1.301 and section 22 of the Office of Federal Procurement Policy Act, as amended (41 U.S.C...

  16. 48 CFR 536.570-11 - Heat.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Heat. 536.570-11 Section... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 536.570-11 Heat. Insert the clause at 552.236-80, Heat, in solicitations and contracts if construction, dismantling...

  17. 48 CFR 552.236-80 - Heat.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Heat. 552.236-80 Section... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 552.236-80 Heat. As prescribed in 536.570-11, insert the following clause: Heat (APR 1984) Unless otherwise specified or unless already...

  18. 48 CFR 970.2270 - Unemployment compensation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Unemployment compensation... Unemployment compensation. (a) Each state has its own unemployment compensation system to provide payments to... unemployment compensation benefits through a payroll tax on employers. Most DOE contractors are subject to the...

  19. NA48: Wiring up for Change

    CERN Multimedia

    2001-01-01

    The NA48 Collaboration is rebuilding its drift chambers ready for the experiment to start up again this coming July. An intricate task involving the soldering of over 24,000 wires! The future of the NA48 experiment is coming right down to the wire, that is, the wires which the Collaboration is installing in the clean room of Hall 887 on the Prévessin site. Six days a week, technicians are working in shifts to rebuild the experiment's drift chambers. The original chambers were damaged when a section of a vacuum tube imploded at the end of 1999. A year ago, CERN gave the green light for this essential part of the spectrometer to be rebuilt, so the NA48 experiment, which studies CP violation (see box), still has a bright future ahead of it. Three years of data-taking ahead The NA48 experiment aims to penetrate the secrets of CP (Charge Parity) violation. Charge and parity are two parameters which distinguish a particle from an antiparticle. In other words, an electron possesses a negative electric ...

  20. 48 CFR 4.302 - Policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Policy. 4.302 Section 4.302 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Paper Documents 4.302 Policy. When electronic commerce methods (see 4.502) are not being used, a contractor should submit paper documents to the...

  1. 48 CFR 4.502 - Policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Policy. 4.502 Section 4.502 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Electronic Commerce in Contracting 4.502 Policy. (a) The Federal Government shall use electronic commerce whenever practicable or cost-effective....

  2. 48 CFR 604.502 - Policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Policy. 604.502 Section 604.502 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL ADMINISTRATIVE MATTERS Electronic Commerce in Contracting 604.502 Policy. (b) The Assistant Secretary of State for Administration is the head of the agency for the purpose of...

  3. 48 CFR 504.502 - Policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Policy. 504.502 Section 504.502 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION GENERAL ADMINISTRATIVE MATTERS Electronic Commerce in Contracting 504.502 Policy. (a) The EPS is GSA's primary vehicle for disseminating synopses and written solicitations....

  4. 48 CFR 2804.506 - Exemptions.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Exemptions. 2804.506 Section 2804.506 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General ADMINISTRATIVE MATTERS Electronic Commerce in Contracting 2804.506 Exemptions. Pursuant to FAR 4.506(b), all determinations that FACNET processing is not cost-effective...

  5. 48 CFR 870.112 - Telecommunications equipment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Telecommunications... DEPARTMENT SUPPLEMENTARY REGULATIONS SPECIAL PROCUREMENT CONTROLS Controls 870.112 Telecommunications... specifications for telecommunications equipment, as defined in VA manual MP-6, Part VIII (available at any VA...

  6. 48 CFR 970.1504 - Contract pricing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  7. 48 CFR 3.103 - Independent pricing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Independent pricing. 3.103 Section 3.103 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 3.103 Independent pricing. ...

  8. 48 CFR 932.7004-2 - Criteria.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Criteria. 932.7004-2 Section 932.7004-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING DOE Loan Guarantee Authority 932.7004-2 Criteria. (a) The materials or services...

  9. 48 CFR 301.607-77 - Governance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Governance. 301.607-77 Section 301.607-77 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL HHS... Governance. The Departmental ACM, in ASFR/OGAPA/DA, serves as the Departmental FAC-P/PM Program Manager and...

  10. 48 CFR 246.408-71 - Aircraft.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Aircraft. 246.408-71... Aircraft. (a) The Federal Aviation Administration (FAA) has certain responsibilities and prerogatives in connection with some commercial aircraft and of aircraft equipment and accessories (Pub. L. 85-726 (72 Stat...

  11. 48 CFR 908.7102 - Aircraft.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Aircraft. 908.7102 Section... REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7102 Aircraft. Acquisition of aircraft shall be in accordance with DOE-PMR 41 CFR 109-38.5205. ...

  12. 48 CFR 2942.1501 - Scope.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Scope. 2942.1501 Section 2942.1501 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1501 Scope. This subpart provides...

  13. 48 CFR 2942.1502 - Policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Policy. 2942.1502 Section 2942.1502 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1502 Policy. DOL contracting officers...

  14. 48 CFR 811.107 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... requests for proposals for technical medical and other technical equipment and devices issued by a field... mechanical equipment (other than technical medical and other technical equipment and devices) issued by a... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 811.107...

  15. 48 CFR 15.405 - Price negotiation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Price negotiation. 15.405... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.405 Price negotiation. (a) The purpose of performing cost or price analysis is to develop a negotiation position that permits the...

  16. 48 CFR 2115.070 - Negotiation authority.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Negotiation authority. 2115.070 Section 2115.070 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL... CONTRACTING BY NEGOTIATION 2115.070 Negotiation authority. The authority to negotiate FEGLI Program contracts...

  17. 48 CFR 1615.070 - Negotiation authority.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Negotiation authority. 1615.070 Section 1615.070 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL... NEGOTIATION 1615.070 Negotiation authority. The authority to negotiate FEHB contracts is conferred by 5 U.S.C...

  18. 48 CFR 725.701 - General.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false General. 725.701 Section... PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.701 General. USAID's source, origin and..., Rules on Source, Origin and nationality for Commodities and Services Financed by USAID. These policies...

  19. 48 CFR Appendix - List of IAAR Forms

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true List of IAAR Forms Federal Acquisition Regulations System BROADCASTING BOARD OF GOVERNORS CLAUSES AND FORMS FORMS Illustrations of Forms The Broadcasting Board of Governors forms. List of IAAR Forms 1953.370-21The Broadcasting Board of Governors Form IA-21, Abstract of...

  20. 48 CFR 46.102 - Policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Policy. 46.102 Section 46.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY... quality requirements, including warranty clauses when appropriate, that are determined necessary to...

  1. 48 CFR 1346.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1346.710 Section 1346.710 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 1346.710 Contract clauses. The warranty clauses and alternates under FAR Subpart 46.710...

  2. 48 CFR 1846.670-3 - Use.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Use. 1846.670-3 Section 1846.670-3 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Material Inspection and Receiving Reports 1846.670-3 Use. The DD Form...

  3. 48 CFR 9.303 - Use.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Use. 9.303 Section 9.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.303 Use. Testing and approval may be appropriate when— (a...

  4. 48 CFR 1506.303-2 - Content.

    Science.gov (United States)

    2017-10-01

    ... 48 Federal Acquisition Regulations System 6 2017-10-01 2017-10-01 false Content. 1506.303-2... PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 1506.303-2 Content. The... incorporate the evaluation of responses to the synopsis in the JOFOC. (See 1506.371(d) for contents of the...

  5. 48 CFR 3006.303-270 - Content.

    Science.gov (United States)

    2017-10-01

    ... 48 Federal Acquisition Regulations System 7 2017-10-01 2017-10-01 false Content. 3006.303-270 Section 3006.303-270 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND... Open Competition 3006.303-270 Content. (a)(9)(iv) For a proposed contract subject to the restrictions...

  6. 48 CFR 306.303-2 - Content.

    Science.gov (United States)

    2008-10-01

    ... 48 Federal Acquisition Regulations System 4 2008-10-01 2008-10-01 false Content. 306.303-2 Section 306.303-2 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.303-2 Content. (a)(1) Each...

  7. 48 CFR 301.704 - Content.

    Science.gov (United States)

    2000-10-01

    ... 48 Federal Acquisition Regulations System 4 2000-10-01 2000-10-01 false Content. 301.704 Section 301.704 Federal Acquisition Regulations System DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL HHS ACQUISITION REGULATION SYSTEM Determinations and Findings 301.704 Content. An example of a D&F format may be...

  8. 48 CFR 1806.303-2 - Content.

    Science.gov (United States)

    1997-10-01

    ... 48 Federal Acquisition Regulations System 6 1997-10-01 1997-10-01 false Content. 1806.303-2 Section 1806.303-2 COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 1806.303-2 Content. ...

  9. 48 CFR 307.7102 - Content.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Content. 307.7102 Section 307.7102 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7102 Content. In accordance with 307.105, the FAR, HHSAR...

  10. 48 CFR 3506.303-2 - Content.

    Science.gov (United States)

    2002-10-01

    ... 48 Federal Acquisition Regulations System 7 2002-10-01 2001-10-01 true Content. 3506.303-2 Section 3506.303-2 Federal Acquisition Regulations System PANAMA CANAL COMMISSION COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 3506.303-2 Content. In addition to...

  11. 48 CFR 6.303-2 - Content.

    Science.gov (United States)

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Content. 6.303-2 Section 6.303-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 6.303-2 Content. (a) Each justification shall...

  12. 48 CFR 3001.704 - Content.

    Science.gov (United States)

    2017-10-01

    ... 48 Federal Acquisition Regulations System 7 2017-10-01 2017-10-01 false Content. 3001.704 Section 3001.704 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY....704 Content. The following format shall be used for all determinations and findings (D&Fs), unless...

  13. 48 CFR 2806.303-2 - Content.

    Science.gov (United States)

    2017-10-01

    ... 48 Federal Acquisition Regulations System 6 2017-10-01 2017-10-01 false Content. 2806.303-2 Section 2806.303-2 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 2806.303-2 Content. In...

  14. 48 CFR 1.704 - Content.

    Science.gov (United States)

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Content. 1.704 Section 1.704 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL FEDERAL ACQUISITION REGULATIONS SYSTEM Determinations and Findings 1.704 Content. Each D&F shall set forth enough facts and...

  15. 48 CFR 701.704 - Content.

    Science.gov (United States)

    2016-10-01

    ... 48 Federal Acquisition Regulations System 5 2016-10-01 2016-10-01 false Content. 701.704 Section 701.704 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL FEDERAL ACQUISITION REGULATION SYSTEM Determinations and Findings 701.704 Content. There is no USAID-prescribed format...

  16. 48 CFR 206.303-2 - Content.

    Science.gov (United States)

    2000-10-01

    ... 48 Federal Acquisition Regulations System 3 2000-10-01 2000-10-01 false Content. 206.303-2 Section 206.303-2 Federal Acquisition Regulations System DEPARTMENT OF DEFENSE ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 206.303-2 Content. (a) Include sufficient...

  17. 48 CFR 606.303-2 - Content.

    Science.gov (United States)

    2017-10-01

    ... 48 Federal Acquisition Regulations System 4 2017-10-01 2017-10-01 false Content. 606.303-2 Section 606.303-2 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 606.303-2 Content. (a) All...

  18. 48 CFR 1845.607 - Scrap.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Scrap. 1845.607 Section 1845.607 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 1845.607 Scrap. ...

  19. 48 CFR 50.203 - General.

    Science.gov (United States)

    2010-10-01

    ... management protections for sellers of QATTs and others in the supply and distribution chain. (b) The SAFETY... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false General. 50.203 Section 50.203 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT...

  20. 48 CFR 11.102 - Standardization program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Standardization program... Standardization program. Agencies shall select existing requirements documents or develop new requirements... Standardization Manual, FSPM-0001; for DoD components, DoD 4120.24-M, Defense Standardization Program Policies and...

  1. 48 CFR 2132.607 - Tax credit.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Tax credit. 2132.607... Contract Debts 2132.607 Tax credit. FAR 32.607 has no practical application to FEGLI Program contracts. The... Government, contractors may not offset debts to the Fund by a tax credit that is solely a Government...

  2. 48 CFR 1632.607 - Tax credit.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Tax credit. 1632.607... 1632.607 Tax credit. FAR 32.607 has no practical application to FEHBP contracts. The statutory... may not offset debts to the Fund by a tax credit which is solely a Government obligation. ...

  3. 48 CFR 47.202 - Presolicitation planning.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Presolicitation planning. 47.202 Section 47.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT... Presolicitation planning. Contracting officers shall inform activities that plan to acquire transportation or...

  4. 48 CFR 873.105 - Acquisition planning.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Acquisition planning. 873.105 Section 873.105 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS DEPARTMENT... planning. (a) Acquisition planning is an indispensable component of the total acquisition process. (b) For...

  5. 48 CFR 806.570 - Planning requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Planning requirements. 806... AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Competition Advocates 806.570 Planning requirements... planning that is required. (3) A description of how to integrate the Competition Plan into advance...

  6. 48 CFR 1631.205-41 - Taxes.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Taxes. 1631.205-41 Section 1631.205-41 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... imposition of taxes, fees, or other monetary payment, directly or indirectly, on FEHB premiums by any State...

  7. 48 CFR 2131.205-41 - Taxes.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Taxes. 2131.205-41 Section 2131.205-41 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES....S.C. 8714(c) or other Federal law prohibits the imposition of taxes, fees, or other monetary...

  8. 48 CFR 9904.407-30 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Definitions. 9904.407-30 Section 9904.407-30 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... measure, expressed in monetary terms, of the price of labor. (3) Labor-time standard means a pre...

  9. 48 CFR 5452.249 - Allocation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Allocation. 5452.249 Section 5452.249 Federal Acquisition Regulations System DEFENSE LOGISTICS AGENCY, DEPARTMENT OF DEFENSE... contemplated and the contract amount is expected to exceed the small purchase limitation. Allocation (DFSC 1995...

  10. 48 CFR 5416.203-3 - Limitations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Limitations. 5416.203-3 Section 5416.203-3 Federal Acquisition Regulations System DEFENSE LOGISTICS AGENCY, DEPARTMENT OF DEFENSE TYPES OF CONTRACTS Fixed Price Contracts 5416.203-3 Limitations. (S-90) A fixed price contract with...

  11. 48 CFR 252.237-7006 - Subcontracting.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Subcontracting. 252.237... Clauses 252.237-7006 Subcontracting. As prescribed in 237.7003(b), use the following clause: Subcontracting (DEC 1991) The Contractor shall not subcontract any work under this contract without the...

  12. 48 CFR 252.247-7018 - Subcontracting.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Subcontracting. 252.247... Clauses 252.247-7018 Subcontracting. As prescribed in 247.270-3(m), use the following clause: Subcontracting (DEC 1991) The Contractor shall not subcontract without the prior written approval of the...

  13. 48 CFR 908.7121 - Special materials.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Special materials. 908... materials. This section covers the purchase of materials peculiar to the DOE program. While purchases of these materials are unclassified, the specific quantities, destination or use may be classified. See...

  14. 48 CFR 212.7002 - Pilot program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Pilot program. 212.7002... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002 Pilot program. ...

  15. 48 CFR 32.1106 - EFT mechanisms.

    Science.gov (United States)

    2010-10-01

    ... banking system, using United States currency, and only the specified mechanisms (U.S. Automated Clearing... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false EFT mechanisms. 32.1106 Section 32.1106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING...

  16. 48 CFR 11.203 - Customer satisfaction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Customer satisfaction. 11... PLANNING DESCRIBING AGENCY NEEDS Using and Maintaining Requirements Documents 11.203 Customer satisfaction. Acquisition organizations shall communicate with customers to determine how well the requirements document...

  17. 48 CFR 6301.6 - Effective date.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Effective date. 6301.6 Section 6301.6 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION BOARD OF CONTRACT APPEALS BOARD OF CONTRACT APPEALS 6301.6 Effective date. This chapter shall apply to all appeals relating...

  18. 48 CFR 570.403 - Expansion requests.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Expansion requests. 570.403 Section 570.403 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION SPECIAL... Continued Space Requirements 570.403 Expansion requests. (a) If the expansion space is in the general scope...

  19. 48 CFR 1837.170 - Pension portability.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Pension portability. 1837... ADMINISTRATION SPECIAL CATEGORIES OF CONTRACTING SERVICE CONTRACTING Service Contracts-General 1837.170 Pension portability. (a) It is NASA's policy not to require pension portability in service contracts. However, pension...

  20. 48 CFR 2009.570-4 - Representation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Representation. 2009.570-4... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-4 Representation... interest representation provision at 2052.209-71 must be included in solicitations and contracts resulting...

  1. 48 CFR 25.702-2 - Certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Certification. 25.702-2 Section 25.702-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Prohibited Sources 25.702-2 Certification. As required by the Sudan...

  2. 48 CFR 15.402 - Pricing policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Pricing policy. 15.402... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.402 Pricing policy. Contracting... certified cost or pricing data when required by 15.403-4, along with data other than certified cost or...

  3. 48 CFR 1615.402 - Pricing policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Pricing policy. 1615.402... Contract Pricing 1615.402 Pricing policy. Pricing of FEHB contracts is governed by 5 U.S.C. 8902(i), 5 U.S.C. 8906, and other applicable law. FAR subpart 15.4 will be implemented by applying its policies and...

  4. 48 CFR 215.402 - Pricing policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Pricing policy. 215.402... OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.402 Pricing policy. Follow the procedures at PGI 215.402 when conducting cost or price analysis, particularly...

  5. 48 CFR 1523.7000 - Background.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Background. 1523.7000 Section 1523.7000 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Computer Equipment 1523.7000 Background. (a) Executive Order 12845 requires the Federal Government to...

  6. 48 CFR 12.212 - Computer software.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Computer software. 12.212... software. (a) Commercial computer software or commercial computer software documentation shall be acquired... required to— (1) Furnish technical information related to commercial computer software or commercial...

  7. 48 CFR 212.212 - Computer software.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Computer software. 212.212... Acquisition of Commercial Items 212.212 Computer software. (1) Departments and agencies shall identify and... technology development), opportunities for the use of commercial computer software and other non...

  8. 48 CFR 636.513 - Accident prevention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Accident prevention. 636... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 636.513 Accident prevention. (a) In... contracting activities shall insert DOSAR 652.236-70, Accident Prevention, in lieu of FAR clause 52.236-13...

  9. 48 CFR 36.513 - Accident prevention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Accident prevention. 36.513 Section 36.513 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL... prevention. (a) The contracting officer shall insert the clause at 52.236-13, Accident Prevention, in...

  10. 48 CFR 1836.513 - Accident prevention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Accident prevention. 1836... 1836.513 Accident prevention. The contracting officer must insert the clause at 1852.223-70, Safety and Health, in lieu of FAR clause 52.236-13, Accident Prevention, and its Alternate I. ...

  11. 48 CFR 836.513 - Accident prevention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Accident prevention. 836... prevention. The contracting officer must insert the clause at 852.236-87, Accident Prevention, in solicitations and contracts for construction that contain the clause at FAR 52.236-13, Accident Prevention. ...

  12. 48 CFR 227.7103-9 - Copyright.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Copyright. 227.7103-9..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-9 Copyright. (a) Copyright license. (1) The clause at 252.227-7013, Rights in Technical Data...

  13. 48 CFR 234.004 - Acquisition strategy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Acquisition strategy. 234..., DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION 234.004 Acquisition strategy. (1) See 209.570 for policy applicable to acquisition strategies that consider the use of lead system...

  14. 48 CFR 34.004 - Acquisition strategy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Acquisition strategy. 34... CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION General 34.004 Acquisition strategy. The program manager, as specified in agency procedures, shall develop an acquisition strategy tailored to the particular...

  15. 48 CFR 252.217-7006 - Title.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Title. 252.217-7006... Clauses 252.217-7006 Title. As prescribed in 217.7104(a), use the following clause: Title (DEC 1991) (a) Unless otherwise provided, title to all materials and equipment to be incorporated in a vessel in the...

  16. 48 CFR 1832.1009 - Title.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Title. 1832.1009 Section... CONTRACTING REQUIREMENTS CONTRACT FINANCING Performance-Based Payments 1832.1009 Title. In accordance with 42 U.S.C. 2465d, NASA shall not take title to launch vehicles under contracts for launch services...

  17. 48 CFR 245.7309-5 - Title.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Title. 245.7309-5 Section... Title. (a) Unless otherwise specified in the Invitation, title to property sold under this Invitation... Contractor, title shall not vest until payment and loading are completed. (b) A Standard Form 97, Certificate...

  18. 48 CFR 1371.111 - Title.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Title. 1371.111 Section... REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.111 Title. Insert clause 1352.271-80, Title, in all solicitations and contracts for ship repair. ...

  19. 48 CFR 32.1009 - Title.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Title. 32.1009 Section 32... REQUIREMENTS CONTRACT FINANCING Performance-Based Payments 32.1009 Title. (a) Since the clause at 52.232-32, Performance-Based Payments, gives the Government title to the property described in paragraph (f) of the...

  20. 48 CFR 51.106 - Title.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Title. 51.106 Section 51... GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 51.106 Title. (a) Title to all... educational institutions and the Government Property clause at 52.245-1, Alternate II, is used, title to...

  1. 48 CFR 970.2703 - Patent rights.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent rights. 970.2703 Section 970.2703 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2703 Patent rights. ...

  2. 48 CFR 35.012 - Patent rights.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Patent rights. 35.012 Section 35.012 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.012 Patent rights. For a discussion of patent rights, see...

  3. 48 CFR 35.011 - Data.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Data. 35.011 Section 35... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.011 Data. (a) R&D contracts shall specify the technical data to be delivered under the contract, since the data clauses required by part 27 do not require the...

  4. 48 CFR 908.7107 - Alcohol.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Alcohol. 908.7107 Section... REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7107 Alcohol. (a) This section covers (1) Bureau of Alcohol, Tobacco and Firearms, (ATF), Treasury Department, alcohol regulations...

  5. 48 CFR 717.700 - General.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false General. 717.700 Section 717.700 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING... an unexpired U.S. patent which has not been held invalid by an unappealed or unappealable court...

  6. 32 CFR 634.48 - General.

    Science.gov (United States)

    2010-07-01

    ... DLA in crime prevention, traffic safety, and the orderly flow of vehicle traffic movement. (b) The vehicle owner's constitutional rights to due process, freedom from unreasonable search and seizure, and... INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Impounding Privately Owned Vehicles § 634.48 General. This...

  7. 48 CFR 39.105 - Privacy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Privacy. 39.105 Section 39... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.105 Privacy. Agencies shall ensure that contracts for information technology address protection of privacy in accordance with the Privacy Act (5 U.S.C...

  8. 48 CFR 228.370 - Additional clauses.

    Science.gov (United States)

    2010-10-01

    ...., helicopters, vertical take-off or landing aircraft, lighter-than-air airships, unmanned aerial vehicles, or... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Additional clauses. 228.370 Section 228.370 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM...

  9. 48 CFR 206.303-2 - Content.

    Science.gov (United States)

    2016-10-01

    ... 48 Federal Acquisition Regulations System 3 2016-10-01 2016-10-01 false Content. 206.303-2 Section 206.303-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF... Content. (b)(i) Include the information required by PGI 206.303-2(b)(i) in justifications citing the...

  10. 48 CFR 3001.704 - Content.

    Science.gov (United States)

    2005-10-01

    ... 48 Federal Acquisition Regulations System 7 2005-10-01 2005-10-01 false Content. 3001.704 Section 3001.704 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY....704 Content. The following format shall be used for all determinations and findings (D&Fs), unless...

  11. 48 CFR 26.401 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 26.401 Section 26.401 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Food Donations to Nonprofit Organizations 26.401 Definitions. As used in this subpart— Apparently wholesome food means...

  12. 48 CFR 26.402 - Policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Policy. 26.402 Section 26.402 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Food Donations to Nonprofit Organizations 26.402 Policy. The Government encourages executive agencies and their contractors...

  13. 48 CFR 31.701 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Purpose. 31.701 Section 31.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 31.701 Purpose. This subpart provides the principles for...

  14. 48 CFR 31.702 - General.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false General. 31.702 Section 31.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 31.702 General. Office of Management and Budget (OMB) Circular...

  15. 48 CFR 231.703 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Requirements. 231.703 Section 231.703 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 231.703 Requirements....

  16. 48 CFR 26.404 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clause. 26.404 Section 26.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Food Donations to Nonprofit Organizations 26.404 Contract clause. Insert the clause at 52.226-6, Promoting Excess...

  17. 48 CFR 26.403 - Procedures.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Procedures. 26.403 Section 26.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Food Donations to Nonprofit Organizations 26.403 Procedures. (a) In accordance with the Federal Food Donation Act of...

  18. 48 CFR 832.006-4 - Procedures.

    Science.gov (United States)

    2010-10-01

    ... information and argument. The proceedings will be conducted in an informal manner and without the requirement... information, if any, provided by the contractor. (c) The SPE must provide a copy of each final determination... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Procedures. 832.006-4...

  19. 48 CFR 252.217-7010 - Performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Performance. 252.217-7010... Clauses 252.217-7010 Performance. As prescribed in 217.7104(a), use the following clause: Performance (JUL..., scrap or other ship's material of the Government resulting from performance of the work as items of...

  20. 48 CFR 3001.704 - Content.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Content. 3001.704 Section 3001.704 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY....704 Content. The following format shall be used for all determinations and findings (D&Fs), unless...

  1. 48 CFR 245.601 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Definitions. 245.601 Section 245.601 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Contractor Inventory 245.601 Definitions. (1) Controlled substances means— (i) Narcotic, depressant...

  2. 48 CFR 242.1106 - Reporting requirements.

    Science.gov (United States)

    2010-10-01

    ... inventory control manager. (ii) If the contractor's report indicates that the contract is on schedule and... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Reporting requirements. 242.1106 Section 242.1106 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS...

  3. 48 CFR 23.1003 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... Government through Leadership in Environmental Management. ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 23.1003....1003 Definitions. As used in this subpart— Federal agency means an executive agency (see 2.101...

  4. 48 CFR 1819.7101 - Definition.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Definition. 1819.7101... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Rural Area Small Business Plan 1819.7101 Definition. Rural area means a county with a population of fewer than twenty thousand individuals. ...

  5. 48 CFR 873.118 - Debriefings.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Debriefings. 873.118... SUPPLEMENTARY REGULATIONS SIMPLIFIED ACQUISITION PROCEDURES FOR HEALTH-CARE RESOURCES 873.118 Debriefings. Offerors excluded from a request for proposals (RFP) may submit a written request for a debriefing to the...

  6. 48 CFR 570.309 - Debriefings.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Debriefings. 570.309 Section 570.309 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION SPECIAL CONTRACTING... Real Property 570.309 Debriefings. The procedures of FAR 15.505 and 15.506 apply to leasing actions. ...

  7. 48 CFR 819.7112 - Internal controls.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Internal controls. 819... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS VA Mentor-Protégé Program 819.7112 Internal controls. (a) OSDBU... Program objectives. OSDBU will establish internal controls as checks and balances applicable to the...

  8. 48 CFR 519.7014 - Internal controls.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Internal controls. 519... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7014 Internal controls. (a) The GSA Mentor-Protégé Program Manager will manage the Program. Internal controls will be established by...

  9. 48 CFR 871.208 - Rehabilitation facilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Rehabilitation facilities... DEPARTMENT SUPPLEMENTARY REGULATIONS LOAN GUARANTY AND VOCATIONAL REHABILITATION AND EMPLOYMENT PROGRAMS Vocational Rehabilitation and Employment Service 871.208 Rehabilitation facilities. Charges by rehabilitation...

  10. 48 CFR 53.242 - Contract administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contract administration. 53.242 Section 53.242 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.242 Contract administration...

  11. 48 CFR 2919.812 - Contract administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract administration. 2919.812 Section 2919.812 Federal Acquisition Regulations System DEPARTMENT OF LABOR SOCIOECONOMIC PROGRAMS SMALL BUSINESS AND SMALL DISADVANTAGED BUSINESS CONCERNS Contracting with the Small Business Administration (The 8(a) Program) 2919.812...

  12. 48 CFR 1228.106 - Administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Administration. 1228.106 Section 1228.106 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds and Other Financial Protections 1228.106 Administration...

  13. 48 CFR 1319.812 - Contract administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract administration. 1319.812 Section 1319.812 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Contracting With the Small Business Administration (the 8(a) Program) 1319.812 Contract administration. Awards unde...

  14. 48 CFR 828.106 - Administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Administration. 828.106 Section 828.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds and Other Financial Protections 828.106 Administration...

  15. 48 CFR 1028.106 - Administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Administration. 1028.106 Section 1028.106 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds 1028.106 Administration...

  16. 48 CFR 3028.106 - Administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Administration. 3028.106 Section 3028.106 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS BONDS AND INSURANCE Bonds and Other Financial Protections 3028.106 Administration...

  17. 48 CFR 1219.812 - Contract administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract administration. 1219.812 Section 1219.812 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Contracting with the Small Business Administration (The 8(a) Program) 1219.812 Contract administration. (d)...

  18. 48 CFR 1328.106 - Administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Administration. 1328.106 Section 1328.106 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds and Other Financial Protections 1328.106 Administration...

  19. 48 CFR 44.307 - Reports.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Reports. 44.307 Section 44... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.307 Reports. The ACO shall distribute copies of CPSR reports; notifications granting, withholding, or withdrawing system approval; and...

  20. 48 CFR 229.170-3 - Reports.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Reports. 229.170-3 Section... DEFENSE GENERAL CONTRACTING REQUIREMENTS TAXES General 229.170-3 Reports. The contracting officer shall submit a report to the designated Security Assistance Office when a foreign government or entity imposes...

  1. 48 CFR 419.201-73 - Reports.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Reports. 419.201-73... SMALL BUSINESS PROGRAMS Policies 419.201-73 Reports. The Director, OSDBU, shall be responsible for submitting reports concerning USDA's progress and achievements in the procurement preference program. ...

  2. 48 CFR 9.106-4 - Reports.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Reports. 9.106-4 Section 9... CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106-4 Reports. (a) The surveying activity... performance. The narrative shall report any persistent pattern of need for costly and burdensome Government...

  3. 48 CFR 501.404 - Class deviations.

    Science.gov (United States)

    2010-10-01

    ... Schedule program is considered to be a class deviation. Each award under such a solicitation is considered... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Class deviations. 501.404... SERVICES ADMINISTRATION ACQUISITION REGULATION SYSTEM Deviations From the FAR and GSAR 501.404 Class...

  4. 48 CFR 434.004 - Acquisition strategy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Acquisition strategy. 434... CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION General 434.004 Acquisition strategy. (a) The program... Systems Executive, a written charter outlining the authority, responsibility, accountability, and budget...

  5. 48 CFR 17.501 - Definition.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definition. 17.501 Section 17.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Interagency Acquisitions Under the Economy Act 17.501 Definition...

  6. 48 CFR 2917.501 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Definitions. 2917.501... CONTRACT TYPES SPECIAL CONTRACTING METHODS Interagency Acquisitions Under The Economy Act 2917.501 Definitions. Interagency Acquisition means a procedure by which a DOL agency obtains needed supplies or...

  7. 48 CFR 19.001 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 19.001... PROGRAMS SMALL BUSINESS PROGRAMS 19.001 Definitions. As used in this part— Concern means any business... the U.S. economy through payment of taxes and/or use of American products, material and/or labor, etc...

  8. 48 CFR 49.607 - Delinquency notices.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Delinquency notices. 49... MANAGEMENT TERMINATION OF CONTRACTS Contract Termination Forms and Formats 49.607 Delinquency notices. The formats of the delinquency notices in this section may be used to satisfy the requirements of 49.402-3...

  9. 48 CFR 1804.470-1 - Scope.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 1804.470-1 Scope. This section... information and information systems. Federal policies include the Federal Information System Management Act... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Scope. 1804.470-1 Section...

  10. 48 CFR 9.305 - Risk.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Risk. 9.305 Section 9.305... QUALIFICATIONS First Article Testing and Approval 9.305 Risk. Before first article approval, the acquisition of materials or components, or commencement of production, is normally at the sole risk of the contractor. To...

  11. 48 CFR 837.7004 - Administrative necessity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Administrative necessity. 837.7004 Section 837.7004 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS...) No relatives or friends claim the remains; and (3) The municipal, county, or State officials refuse...

  12. 48 CFR 9904.404.20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.404.20 Section 9904.404.20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.404.20 Purpose. This Standard requires that, for purposes of cost...

  13. 48 CFR 9904.410-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.410-20 Section 9904.410-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.410-20 Purpose. The purpose of this Cost Accounting Standard is to...

  14. 48 CFR 9904.402-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.402-20 Section 9904.402-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.402-20 Purpose. The purpose of this standard is to require that...

  15. 48 CFR 9904.408-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.408-20 Section 9904.408-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.408-20 Purpose. The purpose of this Standard is to improve, and...

  16. 48 CFR 9904.406-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.406-20 Section 9904.406-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.406-20 Purpose. The purpose of this Cost Accounting Standard is to...

  17. 48 CFR 5119.1003 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 5119.1003 Section 5119.1003 Federal Acquisition Regulations System DEPARTMENT OF THE ARMY ACQUISITION REGULATIONS SMALL... 5119.1003 Purpose. (c)(S-90) The purpose of the Dredging Program is to— (i) Expand small business and...

  18. 48 CFR 9905.506-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9905.506-20 Section 9905.506-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.506-20 Purpose. The purpose of this...

  19. 48 CFR 9904.401-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.401-20 Section 9904.401-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.401-20 Purpose. The purpose of this Cost Accounting Standard is to...

  20. 48 CFR 9901.301 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9901.301 Section 9901.301 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET ADMINISTRATION RULES AND PROCEDURES 9901.301 Purpose. This...

  1. 48 CFR 9904.409-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.409-20 Section 9904.409-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.409-20 Purpose. The purpose of this Standard is to provide criteria...

  2. 48 CFR 9904.417-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.417-20 Section 9904.417-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.417-20 Purpose. The purpose of this Cost Accounting Standard is to...

  3. 48 CFR 9905.502-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9905.502-20 Section 9905.502-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.502-20 Purpose. The purpose of this...

  4. 48 CFR 9904.413-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.413-20 Section 9904.413-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.413-20 Purpose. A purpose of this Standard is to provide guidance...

  5. 48 CFR 9904.411-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.411-20 Section 9904.411-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.411-20 Purpose. (a) The purpose of this Cost Accounting Standard is...

  6. 48 CFR 9904.415-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.415-20 Section 9904.415-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.415-20 Purpose. (a) The purpose of this Standard 9904.415 is to...

  7. 48 CFR 9904.420-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.420-20 Section 9904.420-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.420-20 Purpose. The purpose of this Cost Accounting Standard is to...

  8. 48 CFR 9904.407-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.407-20 Section 9904.407-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.407-20 Purpose. (a) The purpose of this Cost Accounting Standard is...

  9. 48 CFR 3001.101 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 3001.101 Section... ACQUISITION REGULATION (HSAR) GENERAL FEDERAL ACQUISITION REGULATIONS SYSTEM Purpose, Authority, Issuance 3001.101 Purpose. The Department of Homeland Security Acquisition Regulation (HSAR) establishes uniform...

  10. 48 CFR 9904.414-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.414-20 Section 9904.414-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.414-20 Purpose. The purpose of this Cost Accounting Standard is to...

  11. 48 CFR 9904.412-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.412-20 Section 9904.412-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.412-20 Purpose. (a) The purpose of this Standard 9904.412 is to...

  12. 48 CFR 9905.501-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9905.501-20 Section 9905.501-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.501-20 Purpose. The purpose of this...

  13. 48 CFR 2901.101 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 2901.101 Section... ACQUISITION REGULATION SYSTEM Purpose, Authority, Issuance 2901.101 Purpose. (a) Chapter 29, Department of... System of the Code of Federal Regulations. (b) The purpose of the DOLAR is to implement the FAR, and to...

  14. 48 CFR 9904.416-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.416-20 Section 9904.416-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.416-20 Purpose. The purpose of this standard is to provide criteria...

  15. 48 CFR 9904.418-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.418-20 Section 9904.418-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.418-20 Purpose. The purpose of this Cost Accounting Standard is to...

  16. 48 CFR 9904.403-20 - Purpose.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.403-20 Section 9904.403-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF... STANDARDS COST ACCOUNTING STANDARDS 9904.403-20 Purpose. (a) The purpose of this Cost Accounting Standard is...

  17. 48 CFR 31.202 - Direct costs.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.202 Direct... amount as an indirect cost if the accounting treatment— (1) Is consistently applied to all final cost... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Direct costs. 31.202...

  18. 48 CFR 570.301 - Market survey.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Market survey. 570.301 Section 570.301 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION SPECIAL CONTRACTING... Real Property 570.301 Market survey. Conduct a market survey to identify potential sources. Use...

  19. 48 CFR 2509.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Suspension. 2509.407 Section 2509.407 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2509.407 Suspension. ...

  20. 48 CFR 2909.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Suspension. 2909.407... CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2909.407 Suspension. (a) The Senior... authorized to make an exception, regarding suspension by another agency suspending official under the...

  1. 48 CFR 609.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Suspension. 609.407 Section 609.407 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 609.407 Suspension. ...

  2. 48 CFR 1309.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Suspension. 1309.407 Section 1309.407 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1309.407 Suspension. ...

  3. 48 CFR 509.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Suspension. 509.407 Section 509.407 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 509.407 Suspension. ...

  4. 48 CFR 9.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Suspension. 9.407 Section 9.407 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 9.407 Suspension. ...

  5. 48 CFR 909.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Suspension. 909.407 Section 909.407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 909.407 Suspension. ...

  6. 48 CFR 809.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Suspension. 809.407 Section 809.407 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 809.407 Suspension. ...

  7. 48 CFR 1509.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Suspension. 1509.407 Section 1509.407 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension and Ineligibility 1509.407 Suspension. ...

  8. 48 CFR 409.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Suspension. 409.407 Section 409.407 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension and Ineligibility 409.407 Suspension. ...

  9. 48 CFR 2009.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Suspension. 2009.407 Section 2009.407 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2009.407 Suspension. ...

  10. 48 CFR 309.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Suspension. 309.407 Section 309.407 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 309.407 Suspension. ...

  11. 48 CFR 1409.407 - Suspension.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Suspension. 1409.407 Section 1409.407 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1409.407 Suspension. ...

  12. 48 CFR 2131.203 - Indirect costs.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Indirect costs. 2131.203 Section 2131.203 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES... FAR 31.203 apply to the allocation of indirect costs. ...

  13. 48 CFR 47.502 - Policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Policy. 47.502 Section 47.502 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... tonnage of these supplies (computed separately for dry bulk carriers, dry cargo liners, and tankers) is...

  14. 48 CFR 47.501 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 47.501 Section 47.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... bareboat charter to, and operated by, U.S. citizens. Tanker means a vessel used primarily for the carriage...

  15. 48 CFR 436.604 - Performance evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Performance evaluation... Performance evaluation. Preparation of performance evaluation reports. (a) In addition to the requirements of FAR 36.604, performance evaluation reports shall be prepared for indefinite-delivery type contracts...

  16. 48 CFR 2936.604 - Performance evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor... reports must be made using Standard Form 1421, Performance Evaluation (Architect-Engineer) as prescribed...

  17. 48 CFR 36.604 - Performance evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance evaluation. 36.604 Section 36.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL... Performance evaluation. See 42.1502(f) for the requirements for preparing past performance evaluations for...

  18. 48 CFR 236.604 - Performance evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Performance evaluation... Architect-Engineer Services 236.604 Performance evaluation. (a) Preparation of performance reports. Use DD Form 2631, Performance Evaluation (Architect-Engineer), instead of SF 1421. (2) Prepare a separate...

  19. 48 CFR 9.601 - Definition.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...

  20. 48 CFR 752.7033 - Physical fitness.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Physical fitness. 752.7033 Section 752.7033 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CLAUSES AND... fitness. For use in all USAID contracts involving performance overseas. Physical Fitness (JUL 1997) (The...

  1. 48 CFR 970.5208-1 - Printing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Printing. 970.5208-1... and Operating Contracts 970.5208-1 Printing. As prescribed in 970.0808-3, insert the following clause: Printing (DEC 2000) (a) To the extent that duplicating or printing services may be required in the...

  2. 48 CFR 1308.802-70 - Printing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Printing. 1308.802-70... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Printing and Related Supplies 1308.802-70 Printing. Insert clause 1352.208-70, Restrictions on Printing and Duplicating, in all...

  3. 48 CFR 1552.208-70 - Printing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Printing. 1552.208-70... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses 1552.208-70 Printing. As prescribed in 1508.870, insert the following clause: Printing (DEC 2005) (a) Definitions...

  4. 48 CFR 3452.208-70 - Printing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Printing. 3452.208-70... Printing. As prescribed in 3408.870, insert the following clause in all solicitations and contracts other than purchase orders: Printing (AUG 1987) Unless otherwise specified in this contract, the contractor...

  5. 48 CFR 3408.870 - Printing clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Printing clause. 3408.870... COMPETITION AND ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Printing and Related Supplies 3408.870 Printing clause. The contracting officer shall insert the clause in 3452.208-70...

  6. 48 CFR 952.208-70 - Printing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Printing. 952.208-70... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.208-70 Printing. As prescribed in 908.802, insert the following clause: Printing (APR 1984) The Contractor shall not engage in, nor...

  7. 48 CFR 970.2803 - Insurance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Insurance. 970.2803 Section 970.2803 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Bonds and Insurance 970.2803 Insurance. ...

  8. 48 CFR 35.013 - Insurance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Insurance. 35.013 Section... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.013 Insurance. Nonprofit, educational, or State institutions performing cost-reimbursement contracts often do not carry insurance. They may claim immunity from...

  9. 48 CFR 47.102 - Transportation insurance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Transportation insurance... MANAGEMENT TRANSPORTATION General 47.102 Transportation insurance. (a) The Government generally (1) retains... carriers and (2) does not buy insurance coverage for its property in the possession of commercial carriers...

  10. 48 CFR 1851.205 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clause. 1851.205 Section 1851.205 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management...

  11. 48 CFR 908.7110 - Coal.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Coal. 908.7110 Section 908... REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7110 Coal. DOE offices and authorized contractors may participate in the Defense Fuel Supply Center (DFSC) coal contracting program for...

  12. 48 CFR 53.105 - Computer generation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Computer generation. 53.105 Section 53.105 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS General 53.105 Computer generation. (a) Agencies may computer-generate the...

  13. 48 CFR 31.205-11 - Depreciation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Depreciation. 31.205-11....205-11 Depreciation. (a) Depreciation on a contractor's plant, equipment, and other capital facilities... method of depreciation or the class life asset depreciation range system is used, the residual value need...

  14. 48 CFR 1224.102-70 - General.

    Science.gov (United States)

    2010-10-01

    ... maintaining the records. Examples of systems of records are: (1) Personnel, payroll and background records... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false General. 1224.102-70 Section 1224.102-70 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION SOCIOECONOMIC...

  15. 48 CFR 22.1020 - Seniority lists.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Seniority lists. 22.1020 Section 22.1020 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... of all service employees on the contractor's or subcontractor's payroll during the last month of the...

  16. 48 CFR 22.406-1 - Policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Policy. 22.406-1 Section 22.406-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS... contract; (2) Adequate payroll reviews, on-site inspections, and employee interviews to determine...

  17. 48 CFR 651.701 - Policy.

    Science.gov (United States)

    2010-10-01

    ... such contractors are paid through the Department's payroll system and they are subject to the standard... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Policy. 651.701 Section 651.701 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT USE OF...

  18. 48 CFR 39.002 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... include a system that is to be used for routine administrative and business applications, such as payroll... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 39.002 Section 39.002 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF...

  19. 48 CFR 428.106 - Administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Administration. 428.106 Section 428.106 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds and Other Financial Protections 428.106 Administration. ...

  20. 48 CFR 2828.106 - Administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Administration. 2828.106 Section 2828.106 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General Contracting Requirements BONDS AND INSURANCE Bonds 2828.106 Administration. ...

  1. 48 CFR 243.204 - Administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Administration. 243.204... OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204 Administration. Follow the procedures at PGI 243.204 for administration of change orders. ...

  2. 48 CFR 228.106 - Administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Administration. 228.106 Section 228.106 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds 228.106 Administration. ...

  3. 48 CFR 1842.271 - NASA clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA clause. 1842.271 Section 1842.271 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION... NASA clause. Insert the clause at 1852.242-70, Technical Direction, when paragraph 3(m) of the NASA...

  4. 48 CFR 29.401 - Domestic contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Domestic contracts. 29.401 Section 29.401 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS TAXES Contract Clauses 29.401 Domestic contracts. ...

  5. 48 CFR 1516.307 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ...-reimbursement contracts when an anticipatory cost letter has been issued on the project. (b) The Contracting... such a provision would be detrimental to ensuring proper contract performance. (c) The Contracting... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clauses. 1516.307...

  6. 48 CFR 1417.206 - Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Evaluation. 1417.206 Section 1417.206 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 1417.206 Evaluation. The determination in FAR 17.206(b...

  7. 48 CFR 15.606-2 - Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation. 15.606-2... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 15.606-2 Evaluation. (a) Comprehensive evaluations shall be coordinated by the agency contact point, who shall attach or imprint on each...

  8. 48 CFR 17.206 - Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation. 17.206 Section... CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 17.206 Evaluation. (a) In awarding the basic contract... officer need not evaluate offers for any option quantities when it is determined that evaluation would not...

  9. 48 CFR 3015.606-2 - Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation. 3015.606-2... Unsolicited Proposals 3015.606-2 Evaluation. (a) Comprehensive evaluations should be completed within sixty... contact point shall advise the offeror accordingly and provide a new evaluation completion date. The...

  10. 48 CFR 1315.606-2 - Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Evaluation. 1315.606-2... CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1315.606-2 Evaluation. (a) If the... 15.606-1, the contracting officer will acknowledge receipt of the proposal, coordinate evaluation...

  11. 48 CFR 1215.606-2 - Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Evaluation. 1215.606-2... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1215.606-2 Evaluation. (a) Comprehensive evaluations should be completed within sixty calendar days after making the initial review...

  12. 48 CFR 401.371 - AGAR Advisories.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false AGAR Advisories. 401.371... ACQUISITION REGULATION SYSTEM Agency Acquisition Regulations 401.371 AGAR Advisories. The SPE may issue AGAR Advisories, consistent with the policies of the FAR and the AGAR, for the following purposes: (a) To...

  13. 48 CFR 1303.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Procurement integrity. 1303.104 Section 1303.104 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 1303.104 Procurement integrity. ...

  14. 48 CFR 1403.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Procurement integrity. 1403.104 Section 1403.104 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 1403.104 Procurement integrity. ...

  15. 48 CFR 803.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Procurement integrity. 803.104 Section 803.104 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 803.104 Procurement integrity. ...

  16. 48 CFR 3.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Procurement integrity. 3.104 Section 3.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 3.104 Procurement integrity. ...

  17. 48 CFR 603.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Procurement integrity. 603.104 Section 603.104 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 603.104 Procurement integrity. ...

  18. 48 CFR 2903.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Procurement integrity. 2903.104 Section 2903.104 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 2903.104 Procurement integrity. ...

  19. 48 CFR 403.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Procurement integrity. 403.104 Section 403.104 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 403.104 Procurement integrity. ...

  20. 48 CFR 2803.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Procurement integrity. 2803.104 Section 2803.104 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 2803.104 Procurement integrity. ...

  1. 48 CFR 503.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Procurement integrity. 503.104 Section 503.104 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 503.104 Procurement integrity. ...

  2. 48 CFR 32.908 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clauses. 32.908 Section 32.908 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING... specify a period longer than 7 days for constructive acceptance or constructive approval, if required to...

  3. 48 CFR 1419.201 - General policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false General policy. 1419.201 Section 1419.201 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SOCIOECONOMIC PROGRAMS...., procurement analyst or other non-operational contract person), for each contracting office where: (i) Annual...

  4. 48 CFR 315.307 - Proposal revisions.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Proposal revisions. 315.307 Section 315.307 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACTING... factors by the Contracting Officer and Project Officer, with assistance from a cost/price analyst, as...

  5. 48 CFR 244.304 - Surveillance.

    Science.gov (United States)

    2010-10-01

    ... Reviews 244.304 Surveillance. (b) The ACO, or the purchasing system analyst (PSA) with the concurrence of... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Surveillance. 244.304 Section 244.304 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT...

  6. 48 CFR 245.7306 - Sales services.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Sales services. 245.7306 Section 245.7306 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Sale of Surplus Contractor Inventory 245.7306...

  7. 48 CFR 245.7302 - Competitive sales.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Competitive sales. 245.7302 Section 245.7302 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Sale of Surplus Contractor Inventory 245.7302...

  8. 48 CFR 2806.303-2 - Content.

    Science.gov (United States)

    2008-10-01

    ... 48 Federal Acquisition Regulations System 6 2008-10-01 2008-10-01 false Content. 2806.303-2 Section 2806.303-2 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE Competition and Acquisition Planning COMPETITION REQUIREMENTS Other Than Full and Open Competition 2806.303-2 Content. In...

  9. 48 CFR 1506.303-2 - Content.

    Science.gov (United States)

    2008-10-01

    ... 48 Federal Acquisition Regulations System 6 2008-10-01 2008-10-01 false Content. 1506.303-2... PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 1506.303-2 Content. The... incorporate the evaluation of responses to the synopsis in the JOFOC. (See 1506.371(d) for contents of the...

  10. 48 CFR 45.106 - Transferring accountability.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Transferring accountability. 45.106 Section 45.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 45.106 Transferring accountability. Government property...

  11. 48 CFR 1509.503 - Waiver.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Waiver. 1509.503 Section 1509.503 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interests 1509.503 Waiver. The Head of the Contracting...

  12. 48 CFR 1509.502 - Applicability.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Applicability. 1509.502 Section 1509.502 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interests 1509.502 Applicability. This...

  13. South African Crime Quarterly - Vol 48 (2014)

    African Journals Online (AJOL)

    Court support workers speak out: Upholding children's rights in the criminal justice system · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. L Townsend, S Waterhouse, C Nomdo, 75-88. http://dx.doi.org/10.4314/sacq.v48i1.7 ...

  14. 48 CFR 1344.302 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Requirements. 1344.302 Section 1344.302 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews § 1344.302 Requirements. The...

  15. 48 CFR 1426.7103-2 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Requirements. 1426.7103-2 Section 1426.7103-2 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Minority Business Reports 1426.7103-2 Requirements. The contracting...

  16. 48 CFR 970.2670-1 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Requirements. 970.2670-1... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Other Socioeconomic Programs 970.2670-1 Requirements. The goal requirements of section 3021 of the Energy Policy Act of 1992, and the attendant reporting...

  17. 48 CFR 925.7003 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Requirements. 925.7003... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7003 Requirements. (a) For the... of nuclear waste; or (2) Add these costs to offers of foreign companies. (b) The requirements of this...

  18. 48 CFR 1426.7102-2 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Requirements. 1426.7102-2 Section 1426.7102-2 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Minority Business Reports 1426.7102-2 Requirements. (a) MBDA-91 Plan...

  19. 48 CFR 23.601 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Requirements. 23.601 Section 23.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... DRUG-FREE WORKPLACE Notice of Radioactive Material 23.601 Requirements. (a) The clause at 52.223-7...

  20. 48 CFR 52.216-21 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Requirements. 52.216-21... Requirements. As prescribed in 16.506(d), insert the following clause: Requirements (OCT 1995) (a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the...

  1. 48 CFR 2944.302 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Requirements. 2944.302 Section 2944.302 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 2944.302 Requirements. The...

  2. 48 CFR 23.905 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Requirements. 23.905... DRUG-FREE WORKPLACE Contractor Compliance With Toxic Chemical Release Reporting 23.905 Requirements. (a... performance of the contract that are subject to Form R filing and reporting requirements, the offeror will...

  3. 48 CFR 31.303 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Requirements. 31.303... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Educational Institutions 31.303 Requirements. (a) Contracts that refer to this subpart 31.3 for determining allowable costs under contracts...

  4. 48 CFR 44.302 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Requirements. 44.302 Section 44.302 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.302 Requirements. (a) The ACO...

  5. 48 CFR 31.703 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Requirements. 31.703 Section 31.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 31.703 Requirements...

  6. 48 CFR 706.303-1 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Requirements. 706.303-1 Section 706.303-1 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 706.303-1 Requirements. (a)-(c) (d...

  7. 48 CFR 926.7103 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Requirements. 926.7103... 1993. 926.7103 Requirements. (a) Section 3161, 42 U.S.C. 7474h, confers a continuing right to a... requirements, including hiring preference requirements, for displaced workers. ...

  8. 48 CFR 6.303-1 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Requirements. 6.303-1... COMPETITION REQUIREMENTS Other Than Full and Open Competition 6.303-1 Requirements. (a) A contracting officer... required by 6.304. (b) Technical and requirements personnel are responsible for providing and certifying as...

  9. 48 CFR 23.1004 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Requirements. 23.1004... DRUG-FREE WORKPLACE Federal Compliance With Right-To-Know Laws and Pollution Prevention Requirements 23.1004 Requirements. (a) E.O. 13148 requires Federal facilities to comply with the provisions of EPCRA...

  10. 48 CFR 41.301 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Requirements. 41.301... CONTRACTING ACQUISITION OF UTILITY SERVICES Requests for Assistance 41.301 Requirements. (a) Requests for... utility service requirements, the agency shall furnish the information in paragraph (a) of this section...

  11. 48 CFR 2806.303-1 - Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Requirements. 2806.303-1 Section 2806.303-1 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE Competition and Acquisition Planning COMPETITION REQUIREMENTS Other Than Full and Open Competition 2806.303-1 Requirements...

  12. 48 CFR 1333.215 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1333.215 Section 1333.215 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 1333.215 Contract clauses. Alternate I of FAR...

  13. 48 CFR 811.204 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.204 Section 811.204 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Using and Maintaining Requirements Documents 811.204 Contract...

  14. 48 CFR 811.503 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.503... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Liquidated Damages 811.503 Contract clause. When the contracting... contracting officer must include the clause in 852.211-74, Liquidated damages, in the contract. ...

  15. 48 CFR 704.404 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 704.404... ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 704.404 Contract clause. If the contract involves access to classified (“Confidential”, “Secret”, or “Top Secret”), or administratively...

  16. 48 CFR 747.507 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 747.507 Section 747.507 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 747.507 Contract clauses. Contracting...

  17. 48 CFR 1345.107 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1345.107 Section 1345.107 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 1345.107 Contract clauses. ...

  18. 48 CFR 904.7201 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 904.7201... MATTERS Public Affairs 904.7201 Contract clause. The contracting officer shall insert the clause at 952.204-75, Public Affairs, in solicitations and contracts that require the contractor to release...

  19. 48 CFR 716.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  20. 48 CFR 1336.609 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1336.609 Section 1336.609 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 1336.609 Contract...

  1. 48 CFR 53.111 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contract clause. 53.111... AND FORMS FORMS General 53.111 Contract clause. Contracting officers shall insert the clause at 52.253-1, Computer Generated Forms, in solicitations and contracts that require the contractor to submit...

  2. 48 CFR 1433.215 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1433.215 Section 1433.215 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 1433.215 Contract clauses. The Disputes...

  3. 48 CFR 819.7009 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 819.7009... Acquisition Program 819.7009 Contract clauses. The contracting officer shall insert VAAR clause 852.219-10... Veteran-Owned Small Business Set-Aside in solicitations and contracts for acquisitions under this subpart. ...

  4. 48 CFR 1416.405 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1416.405 Section 1416.405 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1416.405 Contract clauses. The BPC, without the power...

  5. 48 CFR 732.111 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111... CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) (b) USAID may obtain short... indefinite quantity contracts that are a combination of contract types. Rather than using the fixed-price...

  6. 48 CFR 908.1104 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 908.1104 Section 908.1104 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Leasing of Motor Vehicles 908.1104 Contract clauses. (f...

  7. 48 CFR 871.212 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 871.212... Rehabilitation and Employment Service 871.212 Contract clauses. Contracting officers must use the following clauses, as appropriate, in solicitations and contracts for vocational rehabilitation and employment...

  8. 48 CFR 811.404 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.404... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 811.404 Contract clause. When delivery is required by or on a particular date for f.o.b. destination contracts, the contracting officer...

  9. 48 CFR 1424.104 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1424.104 Section 1424.104 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SOCIOECONOMIC PROGRAMS PROTECTION OF PRIVACY AND FREEDOM OF INFORMATION Protection of Individual Privacy 1424.104 Contract clauses...

  10. 48 CFR 923.903 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 923.903... Environmental Management Systems § 923.903 Contract clause. The FAR Environmental Management Systems clause at 52.223-XX should be used in contracts where the contractor operates a DOE site or portion thereof...

  11. 48 CFR 833.215 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 833.215 Section 833.215 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 833.215 Contract clause. The contracting...

  12. 48 CFR 1339.107 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1339.107... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 1339.107 Contract clauses. Insert clause 1352.239-70, Software License Addendum, in all contracts when the primary purpose is to purchase new software licenses...

  13. 48 CFR 822.305 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 822.305... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety Standards Act 822.305 Contract clause. The contracting officer shall insert the clause at 852.222-70, Contract Work...

  14. 48 CFR 923.103 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 923.103... Contract clauses. Insert the clause at 952.223-78, Sustainable Acquisition Program, or its Alternate I, in all contracts under which the contractor operates Government-owned facilities or Government-owned...

  15. 48 CFR 837.403 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 837.403... OF CONTRACTING SERVICE CONTRACTING Nonpersonal Health Care Services 837.403 Contract clause. The contracting officer shall insert the clause at 852.237-7, Indemnification and medical liability insurance, in...

  16. 48 CFR 1404.802 - Contract files.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract files. 1404.802 Section 1404.802 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL ADMINISTRATIVE MATTERS Contract Files 1404.802 Contract files. In addition to the requirements in FAR 4.802, files shall...

  17. 48 CFR 1443.205 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1443.205 Section 1443.205 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1443.205 Contract clauses. BPCs may establish procedures, when...

  18. 48 CFR 903.971 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 903.971... Contract clause. The contracting officer shall insert the clause at 952.203-70, Whistleblower Protection for Contractor Employees, in contracts that involve work to be done on behalf of DOE directly related...

  19. 48 CFR 1427.303 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1427.303 Section 1427.303 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts. 1427.303 Contract clauses...

  20. 48 CFR 916.307 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.307 Section 916.307 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 916.307 Contract clauses. (g) Insert the...

  1. 48 CFR 745.106 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 745.106 Section 745.106 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 745.106 Contract clauses. (a) The contracting officer shall insert the...

  2. 48 CFR 819.709 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 819.709... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 819.709 Contract clause. The contracting officer shall insert VAAR clause 852.219-9, Small Business Subcontracting Plan Minimum...

  3. 48 CFR 1609.471 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... certification, means officers; directors; owners; partners; and persons having primary management or supervisory... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification..., Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...

  4. 48 CFR 908.7101 - Motor vehicles.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Motor vehicles. 908.7101 Section 908.7101 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7101 Motor vehicles. ...

  5. 48 CFR 825.104 - Nonavailable articles.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Nonavailable articles. 825... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Buy American Act-Supplies 825.104 Nonavailable articles. The following items are added to the list of nonavailable articles contained in FAR 25.104: Glass, lead Insulin...

  6. 48 CFR 425.104 - Nonavailable articles.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Nonavailable articles. 425.104 Section 425.104 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Buy American Act-Supplies 425.104 Nonavailable articles. Information required...

  7. 48 CFR 225.104 - Nonavailable articles.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Nonavailable articles. 225.104 Section 225.104 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM... Nonavailable articles. (a) DoD has determined that the following articles also are nonavailable in accordance...

  8. 48 CFR 25.104 - Nonavailable articles.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Nonavailable articles. 25... PROGRAMS FOREIGN ACQUISITION Buy American Act-Supplies 25.104 Nonavailable articles. (a) The following articles have been determined to be nonavailable in accordance with 25.103(b)(1)(i): Acetylene, black. Agar...

  9. 48 CFR 22.804-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction. 22.804-2... Construction. (a) Construction contractors that hold a nonexempt (see 22.807) Government construction contract... affirmative action requirements that specify goals for minorities and women in covered construction trades...

  10. 48 CFR 1422.804-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction. 1422.804-2 Section 1422.804-2 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SOCIOECONOMIC... Construction. Bureau contracting offices are responsible for maintaining (including updates and revisions...

  11. 48 CFR 922.804-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction. 922.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITION Equal Employment Opportunity 922.804-2 Construction. (a) Construction contracts, including cost-sharing contracts, are subject to OFCCP orders applicable in particular...

  12. 48 CFR 522.804-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Construction. 522.804-2... Construction. Goals for the employment of minorities and women in the construction industry are established by... Construction Contractors.” This guide can be accessed at http://www.dol.gov/esa/ofccp/TAguides/ctaguide.htm. ...

  13. 48 CFR 1522.804-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...

  14. 48 CFR 422.804-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...

  15. 48 CFR 53.236-1 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Construction. 53.236-1... AND FORMS FORMS Prescription of Forms 53.236-1 Construction. The following forms are prescribed, as stated below, for use in contracting for construction, alteration, or repair, or dismantling, demolition...

  16. 48 CFR 4.301 - Definition.

    Science.gov (United States)

    2010-10-01

    ... MATTERS Paper Documents 4.301 Definition. Printed or copied double-sided, as used in this subpart, means printing or reproducing a document so that information is on both sides of a sheet of paper. ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definition. 4.301 Section...

  17. 48 CFR 3009.570-2 - Policy.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant... system (See (HSAR) 48 CFR 3002.101) by DHS may have any direct financial interest in the development or... took appropriate steps to prevent any organizational conflict of interest in the selection process; or...

  18. 48 CFR 732.403 - Applicability.

    Science.gov (United States)

    2010-10-01

    ... similar activities related to economic growth or the solution of social problems of developing countries. ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Applicability. 732.403 Section 732.403 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL...

  19. 48 CFR 1631.203 - Indirect costs.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Indirect costs. 1631.203 Section 1631.203 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial...

  20. 48 CFR 9.501 - Definition.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 9.501 Definition. Marketing... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definition. 9.501 Section... of an offer for a Government contract by that offeror. An independent contractor is not a marketing...

  1. Genetics Home Reference: 48,XXYY syndrome

    Science.gov (United States)

    ... during puberty can lead to reduced facial and body hair, poor muscle development, low energy levels, and an increased risk for breast enlargement (gynecomastia). Because their testes do not ... other parts of the body as well. Males with 48,XXYY syndrome are ...

  2. 48 CFR 503.570 - Advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Advertising. 503.570 Section 503.570 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Other Improper Business Practices 503.570 Advertising. ...

  3. 48 CFR 2804.470-2 - Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Responsibilities. 2804.470-2 Section 2804.470-2 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 2804.470-2 Responsibilities. (a) The...

  4. 48 CFR 2015.303 - Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Responsibilities. 2015.303 Section 2015.303 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION CONTRACTING METHODS... Responsibilities. (a) The source selection authority is the contracting officer. The contracting officer, acting as...

  5. 48 CFR 2434.003 - Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Responsibilities. 2434.003 Section 2434.003 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS MAJOR SYSTEM ACQUISITIONS 2434.003 Responsibilities. (a) The Senior...

  6. 48 CFR 1532.006-3 - Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Responsibilities. 1532.006-3 Section 1532.006-3 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING 1532.006-3 Responsibilities. (a) EPA shall use the procedures in...

  7. 48 CFR 2415.303 - Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Responsibilities. 2415.303 Section 2415.303 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT... Responsibilities. (a) In accordance with FAR 15.303, the source selection authorities are designated as follows: (1...

  8. 48 CFR 1515.303 - Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Responsibilities. 1515.303 Section 1515.303 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 1515.303 Responsibilities. The...

  9. 48 CFR 1522.803 - Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Responsibilities. 1522.803 Section 1522.803 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Responsibilities. If the applicability of E.O. 11246 and implementing regulations are questioned, the Contracting...

  10. 48 CFR 239.7409 - Special assembly.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Special assembly. 239.7409... Services 239.7409 Special assembly. (a) Special assembly is the designing, manufacturing, arranging... general use equipment. (b) Special assembly rates and charges shall be based on estimated costs. The...

  11. 48 CFR 945.506 - Identification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Identification. 945.506 Section 945.506 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT GOVERNMENT PROPERTY Management of Government Property in the Possession of Contractors 945.506 Identification. The...

  12. 48 CFR 815.404 - Proposal analysis.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Proposal analysis. 815.404 Section 815.404 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 815.404 Proposal analysis. ...

  13. 48 CFR 915.404 - Proposal analysis.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Proposal analysis. 915.404 Section 915.404 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404 Proposal analysis. ...

  14. 48 CFR 15.404 - Proposal analysis.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Proposal analysis. 15.404 Section 15.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404 Proposal analysis. ...

  15. 48 CFR 315.404 - Proposal analysis.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Proposal analysis. 315.404 Section 315.404 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 315.404 Proposal analysis. ...

  16. 48 CFR 212.211 - Technical data.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  17. 48 CFR 12.211 - Technical data.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Technical data. 12.211... ACQUISITION OF COMMERCIAL ITEMS Special Requirements for the Acquisition of Commercial Items 12.211 Technical data. Except as provided by agency-specific statutes, the Government shall acquire only the technical...

  18. 48 CFR 22.1102 - Definition.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definition. 22.1102 Section 22.1102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC..., architecture, dentistry, engineering, law, medicine, nursing, pharmacy, the sciences (such as biology...

  19. 48 CFR 803.7001 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 803.7001 Section 803.7001 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Contractor Responsibility to Avoid Improper Business...

  20. Scandium doped Strontium Titanate Ceramics: Structure, Microstructure, and Dielectric Properties

    Directory of Open Access Journals (Sweden)

    Tkach, Alexander

    2008-08-01

    Full Text Available Sc-doped strontium titanate (ST ceramics were synthesised by solid state reaction, according to the composition Sr1-1.5xScxTiO3 with x = 0-0.01. Structural properties and microstructure development was examined by XRD and SEM. The dielectric properties were evaluated as a function of the temperature and frequency in the radio frequency range. Lattice parameter, density and grain size, were found to decrease slightly with increasing Sc content. The dielectric permittivity and losses decrease also. Sc-doping has only a weak effect on the quantum paraelectric behaviour of ST and no dielectric anomaly was observed, what is probably related to the limited solubility of Sc on the Sr site of the perovskite lattice of ST.

    Se sintetizaron materiales cerámicos de titanato de estroncio dopado con escandio mediante reacción en estado sólido De acuerdo a la composición Sr1-1.5xScxTiO3 con x= 0-0.1. Las propiedades estructurales y el desarrollo microestructural se estudiaron mediante XRD y SEM. La propiedades dieléctricas se estudiaron como función de la temperatura y de la frecuencia en el rango de la frecuencias de radio. Se observó que los parámetros de red, la densidad y el tamaño del grano disminuyen ligeramente con el contenido en Sc. La permitividad dieléctrica y las perdidas también disminuyen. El dopado con Sc tiene un efecto muy ligero sobre el comportamiento paraeléctrico cuántico del titanato de estroncio y no se observó anomalías dioeléctricas , lo que está probablemente relacionado con la baja solubilidad del Sc en posiciones del Sr en la estructura tipo perovskita del titanato de estroncio.

  1. Phenoxyl radical complexes of gallium, scandium, iron and manganese.

    Science.gov (United States)

    Adam, B; Bill, E; Bothe, E; Goerdt, B; Haselhorst, G; Hildenbrand, K; Sokolowski, A; Steenken, S; Weyhermüller, T; Wieghardt, K

    1997-02-01

    The hexadentate macrocyclic ligands 1,4,7-tris(3,5-dimethyl-2-hydroxybenzyl)-1,4,7-triazacyclononane (L CH 3H3 ), 1,4,7-tris(3,5-di-tert-butyl-2-hydroxybenzyl)-1,4,7-triazacyclononane (L(Bu) H3 ) and 1,4,7-tris(3-tert-butyl-5-methoxy-2-hydroxybenzyl)-1,4,7-triazacyclononane (L OCH 3-H3 ) form very stable octahedral neutral complexes LM(III) with trivalent (or tetravalent) metal ions (Ga(III) , Sc(III) , Fe(III) , Mn(III) , Mn(IV) ). The following complexes have been synthesized: [L(Bu) M], where M = Ga (1), Sc (2), Fe (3); [L(Bu) Mn(IV) ]PF6 (4'); [L OCH 3M], where M = Ga (1 a), Sc (2 a), Fe (3 a); [L OCH 3Mn(IV) ]PF6 (4 a'); [L CH 3M], where M = Sc (2 b), Fe (3 b), Mn(III) (4 b); [L CH 3Mn(IV) ]2 (ClO4 )3 (H3 O)(H2 O)3 (4 b'). An electrochemical study has shown that complexes 1, 2, 3, 1 a, 2 a and 3 a each display three reversible, ligand-centred, one-electron oxidation steps. The salts [L OCH 3Fe(III) ]ClO4 and [L OCH 3Ga(III) ]ClO4 , have been isolated as stable crystalline materials. Electronic and EPR spectra prove that these oxidations produce species containing one, two or three coordinated phenoxyl radicals. The Mössbauer spectra of 3 a and [3 a](+) show conclusively that both compounds contain high-spin iron(III) central ions. Temperature-dependent magnetic susceptibility measurements reveal that 3 a has an S = 5/2 and [3a](+) an S = 2 ground state. The latter is attained through intramolecular antiferromagnetic exchange coupling between a high-spin iron(III) (S1 = 5/2) and a phenoxyl radical (S2 = 1/2) (H = - 2JS1 S2 ; J = - 80 cm(-1) ). The manganese complexes undergo metal- and ligand-centred redox processes, which were elucidated by spectroelectrochemistry; a phenoxyl radical Mn(IV) complex [Mn(IV) L OCH 3](2+) is accessible. Copyright © 1997 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  2. Spark plasma sintering of aluminum powders prealloyed with scandium additions

    Energy Technology Data Exchange (ETDEWEB)

    Cooke, R.W.; Kraus, N.P.; Bishop, D.P., E-mail: Paul.Bishop@dal.ca

    2016-03-07

    The objective of this research was to commence work on the spark plasma sintering (SPS) of Al–Sc alloys in an effort to develop fundamental data in this area. In this precursory study, a series of binary systems containing 0.1 to 0.4 wt% Sc were processed in laboratory and industrial-scale equipment. Data revealed that all powders were responsive to SPS in both scenarios and that sintering temperature was a variable of critical importance. Hardness of as-sintered products scaled directly with Sc concentration but varied inversely with SPS temperature owing to in-situ aging of the raw powders. Hardness losses could be recovered through a post-SPS heat treatment into the T6 condition. Industrially processed slugs of Al-0.4Sc-T6 exhibited full densification and offered the highest hardness (786+/−8 MPa). This was accompanied by a nominal tensile yield strength of 197 MPa, UTS of 226 MPa and tensile ductility of 11%.

  3. Tin etching from metallic and oxidized scandium thin films

    NARCIS (Netherlands)

    Pachecka, Malgorzata; Lee, Christopher James; Sturm, J.M.; Bijkerk, Frederik

    The role of oxide on Sn adhesion to Sc surfaces was studied with in-situ ellipsometry, X-ray photoelectron spectroscopy and secondary electron microscopy. Sn etching with hydrogen radicals was performed on metallic Sc, metallic Sc with a native oxide, and a fully oxidized Sc layer. The results show

  4. The structural and magnetic properties of holmium/scandium superlattices

    DEFF Research Database (Denmark)

    Bryn-Jacobsen, C.; Cowley, R.A.; McMorrow, D.F.

    1997-01-01

    The properties of Ho/Sc superlattices grown by molecular beam epitaxy (MBE) have been investigated using X-ray and neutron diffraction techniques. Structural studies reveal the novel existence of more than one a lattice parameter. Examining the magnetic properties, it is found that the Ho 4f...

  5. Tensile Strength Reliability Analysis of Cu48Zr48Al4 Amorphous Microwires

    Directory of Open Access Journals (Sweden)

    Haichao Sun

    2016-11-01

    Full Text Available Uniform Cu48Zr48Al4 amorphous microwires with a high surface quality are fabricated by a melt extraction technique. The mechanical property of microwires is evaluated via tensile tests. To estimate the strength scattering, statistical analysis of fracture strengths is conducted using logarithmic normal distribution, and two- and three-parameter Weibull analysis, severally. The results show that the tensile strengths of Cu48Zr48Al4 amorphous microwires range from 1724 to 1937 MPa with the arithmetical average value of 1836 MPa, and the arithmetical standard deviation of 56.4 MPa. The geometric mean of fracture strength is 1840 MPa using logarithmic normal distribution statistical analysis. Using two- and three-parameter Weibull analysis, the Weibull modulus and fracture threshold value are respectively calculated for 34.8 and 1483 MPa, which shows the excellent tensile mechanical properties with a high predictability of Cu48Zr48Al4 amorphous microwires and further indicates the great potential of application.

  6. Antimicrobial activity of a 48-kDa protease (AMP48) from Artocarpus heterophyllus latex.

    Science.gov (United States)

    Siritapetawee, J; Thammasirirak, S; Samosornsuk, W

    2012-01-01

    Artocarpus heterophyllus (jackfruit) is a latex producing plant. Plant latex is produced from secretory cells and contains many intergradients. It also has been used in folk medicine. This study aimed to purify and characterize the biological activities of a protease from jackfruit latex. A protease was isolated and purified from crude latex of a jackfruit tree by acid precipitation and ion exchange chromatography. The proteolytic activities of protein were tested using gelatin- and casein-zymography. The molecular weight and isoelectric point (pl) of protein were analysed by SDS/12.5% PAGE and 2D-PAGE, respectively. Antimicrobial activity of protein was analysed by broth microdilution method. In addition, the antibacterial activity of protein against Pseudomonas aeruginosa ATCC 27853 was observed and measured using atomic force microscopy (AFM) technique. The purified protein contained protease activity by digesting gelatin- and casein-substrates. The protease was designated as antimicrobial protease-48 kDa or AMP48 due to its molecular mass on SDS-PAGE was approximately 48 kDa. The isoelectric point (pl) of AMP48 was approximately 4.2. In addition, AMP48 contained antimicrobial activities by it could inhibit the growths of Pseudomonas aeruginosa ATCC 27853 and clinical isolated Candida albicans at minimum inhibitory concentration (MIC) 2.2 mg/ml and Minimum microbicidal concentration (MMC) 8.8 mg/ml. AFM image also supported the antimicrobial activities of AMP48 by the treated bacterial morphology and size were altered from normal.

  7. Backbending phenomenon in {sup 48}Cr

    Energy Technology Data Exchange (ETDEWEB)

    Tanaka, T. [Tohoku Univ., Sendai (Japan); Iwasawa, K.; Sakata, F.; Marumori, T.

    1998-07-01

    A new mechanism of the backbending phenomena is discussed by analysing the yrast band of {sup 48}Cr where no single-particle level-crossing is expected. It is pointed out that a full self-consistent mean-field treatment by properly taking into account of the two-body interaction is crucial in explaining the backbending phenomena which occur within the fp-shell without any intruder orbits. (author)

  8. 48 CFR 519.7015 - Reports.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Reports. 519.7015 Section... SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7015 Reports. (a) Semi-annual reports shall be... section 552.219-76(c). (b) Protégés must agree to provide input into the mentor firm's semi-annual reports...

  9. Adaptive 4-8 Texture Hierarchies

    Energy Technology Data Exchange (ETDEWEB)

    Hwa, L M; Duchaineau, M A; Joy, K I

    2004-08-02

    We address the texture level-of-detail problem for extremely large surfaces such as terrain during real-time, view-dependent rendering. A novel texture hierarchy is introduced based on 4-8 refinement of raster tiles, in which the texture grids in effect rotate 45 degrees for each level of refinement. This hierarchy provides twice as many levels of detail as conventional quad-tree-style refinement schemes such as mipmaps, and thus provides per-pixel view-dependent filtering that is twice as close to the ideal cutoff frequency for an average pixel. Because of this more gradual change in low-pass filtering, and due to the more precise emulation of the ideal cutoff frequency, we find in practice that the transitions between texture levels of detail are not perceptible. This allows rendering systems to avoid the complexity and performance costs of per-pixel blending between texture levels of detail. The 4-8 texturing scheme is integrated into a variant of the Real-time Optimally Adapting Meshes (ROAM) algorithm for view-dependent multiresolution mesh generation. Improvements to ROAM included here are: the diamond data structure as a streamlined replacement for the triangle bintree elements, the use of low-pass-filtered geometry patches in place of individual triangles, integration of 4-8 textures, and a simple out-of-core data access mechanism for texture and geometry tiles.

  10. Aerosol Research Branch (ARB) 48 inch Lidar Data

    Data.gov (United States)

    National Aeronautics and Space Administration — The ARB_48_IN_LIDAR data set contains data collected from a 48-inch lidar system located at NASA Langley Research Center. Each granule consists of one year of data....

  11. 26 CFR 48.4218-5 - Computation of tax.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Computation of tax. 48.4218-5 Section 48.4218-5... by Manufacturer Or Importer Considered Sale § 48.4218-5 Computation of tax. (a) Tax based on price... ratio, and, therefore, need not be taken into account in the computation since the inclusion and...

  12. 49 CFR 393.48 - Brakes to be operative.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Brakes to be operative. 393.48 Section 393.48 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... NECESSARY FOR SAFE OPERATION Brakes § 393.48 Brakes to be operative. (a) General rule. Except as provided in...

  13. 32 CFR 48.504 - Payment to children.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Payment to children. 48.504 Section 48.504... RETIRED SERVICEMAN'S FAMILY PROTECTION PLAN Annuity § 48.504 Payment to children. (a) Annuities for a child or children will be paid to the child's guardian, or if there is no guardian, to the person(s) who...

  14. 21 CFR 1316.48 - Notice of appearance.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Notice of appearance. 1316.48 Section 1316.48 Food..., AND PROCEDURES Administrative Hearings § 1316.48 Notice of appearance. Any person entitled to a... within the time specified in the notice of proposed rulemaking, a written notice of appearance in the...

  15. 7 CFR 48.7 - Evidence to justify dumping.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Evidence to justify dumping. 48.7 Section 48.7... Dumping § 48.7 Evidence to justify dumping. Any person, receiving produce in interstate commerce or in the..., prior to such destroying, abandoning, discarding or dumping, obtain a dumping certificate or other...

  16. 7 CFR 48.1 - Meaning of words.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Meaning of words. 48.1 Section 48.1 Agriculture... SECRETARY OF AGRICULTURE FOR THE ENFORCEMENT OF THE PRODUCE AGENCY ACT Definitions § 48.1 Meaning of words. Words in this part in the singular form shall be deemed to import the plural, and vice versa, as the...

  17. 26 CFR 48.4081-8 - Taxable fuel; measurement.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Taxable fuel; measurement. 48.4081-8 Section 48.4081-8 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) MISCELLANEOUS... Taxable Fuel Taxable Fuel § 48.4081-8 Taxable fuel; measurement. (a) In general. Volumes of taxable fuel...

  18. 26 CFR 48.4217-1 - Lease considered as sale.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Lease considered as sale. 48.4217-1 Section 48.4217-1 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) MISCELLANEOUS... Taxes § 48.4217-1 Lease considered as sale. For purposes of Chapter 32 of the Code, the lease of an...

  19. 26 CFR 48.4041-18 - Fuels containing alcohol.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Fuels containing alcohol. 48.4041-18 Section 48... EXCISE TAXES MANUFACTURERS AND RETAILERS EXCISE TAXES Special Fuels § 48.4041-18 Fuels containing alcohol..., of any liquid fuel described in section 4041(a) (1) or (2) which consists of at least 10% alcohol by...

  20. 7 CFR 959.48 - Research and development.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Research and development. 959.48 Section 959.48... Regulating Handling Research and Development § 959.48 Research and development. The committee, with the... research, and development projects designed to assist, improve, or promote the marketing, distribution...

  1. 26 CFR 48.4081-6 - Gasoline; gasohol.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Gasoline; gasohol. 48.4081-6 Section 48.4081-6... Fuel Taxable Fuel § 48.4081-6 Gasoline; gasohol. (a) Overview. This section provides rules for determining the applicability of reduced rates of tax on a removal or entry of gasohol or of gasoline used to...

  2. 7 CFR 966.48 - Research and promotion.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Research and promotion. 966.48 Section 966.48... Regulating Handling Research and Development § 966.48 Research and promotion. The committee may, with the... research, marketing research and development projects, and marketing promotion including paid advertising...

  3. 30 CFR 48.24 - Cooperative training program.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Cooperative training program. 48.24 Section 48... Surface Areas of Underground Mines § 48.24 Cooperative training program. (a) An operator of a mine may conduct his own training programs, or may participate in training programs conducted by MSHA, or may...

  4. 30 CFR 7.48 - Acid resistance test.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Acid resistance test. 7.48 Section 7.48 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.48 Acid resistance test. (a...

  5. 36 CFR 7.48 - Lake Mead National Recreation Area.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Lake Mead National Recreation Area. 7.48 Section 7.48 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR SPECIAL REGULATIONS, AREAS OF THE NATIONAL PARK SYSTEM § 7.48 Lake Mead National Recreation Area...

  6. Cdc48: A Swiss Army Knife of Cell Biology

    Directory of Open Access Journals (Sweden)

    Guem Hee Baek

    2013-01-01

    Full Text Available Cdc48 (also called VCP and p97 is an abundant protein that plays essential regulatory functions in a broad array of cellular processes. Working with various cofactors, Cdc48 utilizes its ATPase activity to promote the assembly and disassembly of protein complexes. Here, we review key biological functions and regulation of Cdc48 in ubiquitin-related events. Given the broad employment of Cdc48 in cell biology and its intimate ties to human diseases (e.g., amyotrophic lateral sclerosis, studies of Cdc48 will bring significant insights into the mechanism and function of ubiquitin in health and diseases.

  7. Coulomb excitation of {sup 48}K

    Energy Technology Data Exchange (ETDEWEB)

    Siebeck, Burkhard; Blazhev, Andrey; Geibel, Kerstin; Hess, Herbert; Reiter, Peter; Seidlitz, Michael; Schneiders, David; Steinbach, Tim; Warr, Nigel [IKP, Universitaet zu Koeln (Germany); Bauer, Christopher [IKP, TU Darmstadt (Germany); Witte, Hilde de [KU Leuven (Belgium); Klintefjord, Malin [University of Oslo (Norway); Pakarinen, Janne [University of Jyvaeskylae (Finland); Rapisarda, Elisa [KU Leuven (Belgium); CERN, Genf (Switzerland); Scheck, Marcus [University of the West of Scotland, Paisley (United Kingdom); Voulot, Didier; Wenander, Frederik [CERN, Genf (Switzerland)

    2016-07-01

    Potassium isotopes in the direct vicinity of doubly-magic nuclei are of great interest and subject of recent shell model calculations. These show that the ground states of most K isotopes are dominated by a π0p0h configuration, while {sup 47}K and {sup 49}K have a major π2p2h contribution. However, the situation is not clear for the odd-odd isotope {sup 48}K, which shows a mixture between 0p0h and 2p2h. In order to study the coupling between the νp{sub 3/2}-shell and the πs{sub 1/2}-, πd{sub 3/2}-shells, transition matrix elements are deduced from a Coulomb excitation experiment performed with MINIBALL at REX-ISOLDE. A {sup 104}Pd target was irradiated by a radioactive {sup 48}K beam. γ rays of both target and projectile deexcitation have been observed. Those yields, together with available spectroscopic data, allow the detemination of transition matrix elements with GOSIA2. The new findings are compared to shell model calculations.

  8. Simulation of vanadium-48 production using MCNPX code

    Directory of Open Access Journals (Sweden)

    Sadeghi Mahdi

    2012-01-01

    Full Text Available Vanadium-48 was produced through the irradiation of the natural titanium target via the natTi(p, xn48V reaction. The titanium target was irradiated at 1 mA current and by a 21 MeV proton beam for 4 hours. In this paper, the activity of 48V, 43Sc, and 46Sc radionuclides and the efficacy of the 47Ti(p, g, 48Ti(p, n, and 49Ti(p, 2n channel reactions to form 48V radionuclide were determined using MCNPX code. Furthermore, the experimental activity of 48V was compared with the estimated value for the thick target yield produced in the irradiation time according to MCNPX code. Good agreement between production yield of the 48V and the simulation yield was observed. In conclusion, MCNPX code can be used for the estimation of the production yield.

  9. NA48 experiment : view along the NA48 beamline with the detector in the distance.

    CERN Multimedia

    Hans Taureg

    1996-01-01

    Photo 02: Side view of the NA48 experiment showing the LKR calorimeter cryostat No one is sure why the Universe wound up the way it has: all matter and no antimatter. According to prevailing theories, the early universe had equal amounts of matter and antimatter. To see what might be missing from the theories, physicists search for the rare cases in which matter and antimatter behave differently. One such imbalance, called direct CP violation, showed up in the NA 31 experiment at CERN. The results from this experiment, first presented in 1993, showed that when K mesons and their antimatter cousins decay, they show a slight preference for matter over antimatter. Later experiments with neutral K mesons, including NA48 at CERN and KTeV at Fermilab in the United States, showed direct CP violation is real.

  10. The NA48 LKr calorimeter readout electronics

    CERN Document Server

    Gianoli, A; Barr, C; Brodier-Yourstone, P; Buchholz, P; Ceccucci, Augusto; Cerri, C; Chlopik, A; Constantini, F; Fantechi, R; Formenti, F; Funk, W; Giudici, Sergio; Gorini, B; Guzik, J A; Hallgren, Björn I; Kozhevnikov, Yu; Iwansky, W; de La Taille, C; Lacourt, A; Laverrière, G C; Ljuslin, C; Mannelli, I; Martin-Chassard, G; Martini, M; Papi, A; Seguin-Moreau, N; Sozzi, M; Tarlé, J C; Velasco, M; Vossnack, O; Wahl, H; Ziolkowski, M

    2000-01-01

    The NA48 experiment at the CERN SPS accelerator is making a measurement of the direct CP violation parameter epsilon '/ epsilon by comparing the four rates of decay of K/sub S/ and K/sub L/ into 2 pi /sup 0/ and pi /sup +/ pi /sup -/. To reconstruct the decays into 2 pi /sup 0/ the information from the almost 13500 channels of a quasi-homogeneous liquid krypton electromagnetic calorimeter is used. The readout electronics of the calorimeter has been designed to provide a dynamic range from a few MeV to about 50 GeV energy deposition per cell, and to sustain a high rate of incident particles. The system is made by cold charge preamplifiers (working at 120 degrees K), low-noise fast shapers followed by digitizer electronics at 40 MHz sampling rate that employs a gain switching technique to expand the dynamic range, where the gain can be selected for each sample individually (i.e. every 25 ns). To reduce the amount of data collected the system contains a zero suppression circuit based on halo expansion. (12 refs)...

  11. Stability of enterocin AS-48 in fruit and vegetable juices.

    Science.gov (United States)

    Grande, Maria J; Lucas, Rosario; Valdivia, Eva; Abriouel, Hikmate; Maqueda, Mercedes; Omar, Nabil Ben; Martínez-Cañamero, Magdalena; Gálvezi, Antonio

    2005-10-01

    Enterocin AS-48 is a candidate bacteriocin for food biopreservation. Before addressing application of AS-48 to vegetable-based foods, the interaction between AS-48 and vegetable food components and the stability of AS-48 were studied. Enterocin AS-48 had variable interactions with fruit and vegetable juices, with complete, partial, or negligible loss of activity. For some juices, loss of activity was ameliorated by increasing the bacteriocin concentration, diluting the juice, or applying a heat pretreatment. In juices obtained from cabbage, cauliflower, lettuce, green beans, celery, and avocado, AS-48 was very stable for the first 24 to 48 h of storage under refrigeration, and decay of activity was markedly influenced by storage temperature. In fresh-made fruit juices (orange, apple, grapefruit, pear, pineapple, and kiwi) and juice mixtures, AS-48 was very stable for at least 15 days at 4 degrees C, and bacteriocin activity was still detectable after 30 days of storage. Gradual and variable loss of activity occurred in juices stored at 15 and 28 degrees C; inactivation was faster at higher temperatures. In commercial fruit juices (orange, apple, peach, and pineapple) stored at 4 degrees C, the bacteriocin was completely stable for up to 120 days, and over 60% of initial activity was still present in juices stored at 15 degrees C for the same period. Commercial fruit juices stored at 28 degrees C for 120 days retained between 31.5% (apple) and 67.71% (peach) of their initial bacteriocin activity. Solutions of AS-48 in sterile distilled water were stable (120 days at 4 to 28 degrees C). Limited loss of activity was observed after mixing AS-48 with some food-grade dyes and thickening agents. Enterocin AS-48 added to lettuce juice incubated at 15 degrees C reduced viable counts of Listeria monocytogenes CECT 4032 and Bacillus cereus LWL1 to below detection limits and markedly reduced viable counts of Staphylococcus aureus CECT 976.

  12. Ground-state correlations in 40Ca and 48Ca

    Science.gov (United States)

    Takayanagi, K.; Lipparini, E.

    1992-01-01

    Second-order perturbation theory with a G-matrix is adopted to examine from a unified point of view the effects of two-particle-two-hole correlations on the matter and momentum distributions and the occupation numbers in 40Ca and 48Ca. Polarization effects induced by the neutron excess in 48Ca are investigated in detail.

  13. 48 CFR 928.101-1 - Policy on use.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Policy on use. 928.101-1... REQUIREMENTS BONDS AND INSURANCE Bonds and Other Financial Protections 928.101-1 Policy on use. In addition to the restriction on use of bid guarantees in 48 CFR 28.101-1(a), a bid guarantee may be required only...

  14. 48 CFR 970.1907-1 - Subcontracting plan requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracting plan... Small Business Concerns 970.1907-1 Subcontracting plan requirements. Pursuant to the clause at 48 CFR 52.219-9, Small Business Subcontracting Plan, which is required for all management and operating...

  15. 7 CFR 48.4 - Destroying or dumping.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Destroying or dumping. 48.4 Section 48.4 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing... dumping. Any person receiving produce in interstate commerce or in the District of Columbia for or on...

  16. 48 CFR 1352.216-77 - Ceiling price.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Ceiling price. 1352.216-77... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.216-77 Ceiling price. As prescribed in 48 CFR 1316.601-70 and 1316.602-70, insert the following clause: Ceiling Price (APR 2010) The...

  17. 48 CFR 970.5244-1 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... management of all facets of the purchasing function, including the Contractor's compliance with its approved... require performance bonds in penal amounts as set forth in 48 CFR 28.102-2(a) for all fixed-priced and... obligees. The penal amounts shall be determined in accordance with 48 CFR 28.102-2(b). (3) For fixed-price...

  18. 28 CFR 48.11 - Intervention in hearings.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Intervention in hearings. 48.11 Section... Intervention in hearings. (a) Any person may intervene as a party in a hearing held under these regulations if... intervention shall be made by filing in accordance with § 48.3(a) and (b), within 20 days after a hearing has...

  19. 19 CFR 10.48 - Engravings, sculptures, etc.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Engravings, sculptures, etc. 10.48 Section 10.48 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY ARTICLES CONDITIONALLY FREE, SUBJECT TO A REDUCED RATE, ETC. General Provisions Works of Art § 10...

  20. 48 CFR 31.205-10 - Cost of money.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost of money. 31.205-10....205-10 Cost of money. (a) General. Cost of money— (1) Is an imputed cost that is not a form of...) Refers to— (i) Facilities capital cost of money (48 CFR 9904.414); and (ii) Cost of money as an element...