WorldWideScience

Sample records for satellite construction project

  1. A Large Scale Problem Based Learning inter-European Student Satellite Construction Project

    DEFF Research Database (Denmark)

    Nielsen, Jens Frederik Dalsgaard; Alminde, Lars; Bisgaard, Morten

    2006-01-01

    that electronic communication technology was vital within the project. Additionally the SSETI EXPRESS project implied the following problems it didn’t fit to a standard semester - 18 months for the satellite project compared to 5/6 months for a “normal” semester project. difficulties in integrating the tasks......A LARGE SCALE PROBLEM BASED LEARNING INTER-EUROPEAN STUDENT SATELLITE CONSTRUCTION PROJECT This paper describes the pedagogical outcome of a large scale PBL experiment. ESA (European Space Agency) Education Office launched January 2004 an ambitious project: Let students from all over Europe build....... The satellite was successfully launched on October 27th 2005 (http://www.express.space.aau.dk). The project was a student driven project with student project responsibility adding at lot of international experiences and project management skills to the outcome of more traditional one semester, single group...

  2. The Swedish satellite project Viking

    International Nuclear Information System (INIS)

    Hultqvist, B.

    1990-01-01

    The Swedish satellite project Viking is described and related to earlier missions. Some new operational characteristics are discussed, including the real-time data analysis campaigns that were an important part of the project. Some areas of important scientific impact of the project are also described. Viking was specially designed and equipped for investigation of plasma physical acceleration and other processes in the transition region between hot and cold plasma on auroral latitude magnetic field lines

  3. About Nano-JASMINE Satellite System and Project Status

    Science.gov (United States)

    Sako, Nobutada

    Intelligent Space Systems Laboratory, The University of Tokyo (ISSL) and National Astronomical Observatory of Japan (NAO) have been developing a small infrared astrometry satellite named “Nano-JASMINE”. The satellite size is about 50cm cubic and 20kg, which plays a pre-cursor role of JASMINE Project which is programmed by NAO and JAXA. In addition, since there has been only one astrometry satellite HIPPARCOS by ESA in the past, Nano-JASMINE is also expected to achieve certain scientific results in the field of astrometry. In this project, ISSL aims to develop new advanced small satellite bus system whose performance is comparable to that of 100-500kg sized satellites, including attitude stability of 1 arc-second and thermal stability of the mission subsystem of 1 mK. This paper overviews the Nano-JASMINE bus system with emphasis on attitude and thermal control systems.

  4. Hurricane Satellite (HURSAT) from International Satellite Cloud Climatology Project (ISCCP) B1, Version 6

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Hurricane Satellite (HURSAT) from derived International Satellite Cloud Climatology Project (ISCCP) B1 observations of tropical cyclones worldwide. The B1 data...

  5. Educational Benefits From the AAU-cubesat Student Satellite Project

    DEFF Research Database (Denmark)

    Alminde, Lars

    2003-01-01

    In September 2001 Aalborg university started the AAU-cubesat project that reached it climax when the student built satellite was launched into space on the 30th of June 2003 on top of a former Russian ICBM. AAU-cubesat was among the first five satellites to be launched that are built within the c......-satellite designs will be given. In addition as the project has been carried through by students then the educational value will be addressed as well....

  6. Educational Benefits from the AAU-Cubesat Student Satellite Project

    DEFF Research Database (Denmark)

    Alminde, Lars

    2003-01-01

    In September 2001 Aalborg university started the AAU-cubesat project that reached it climax when the student built satellite was launched into space on the 30th of June 2003 on top of a former Russian ICBM. AAU-cubesat was among the first five satellites to be launched that are built within the c...... on pico-satellite designs will be given. In addition as the project has been carried through by students then the educational value will be addressed as well....

  7. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  8. The German joint research project "concepts for future gravity satellite missions"

    Science.gov (United States)

    Reubelt, Tilo; Sneeuw, Nico; Fichter, Walter; Müller, Jürgen

    2010-05-01

    Within the German joint research project "concepts for future gravity satellite missions", funded by the Geotechnologies programme of the German Federal Ministry of Education and Research, options and concepts for future satellite missions for precise (time-variable) gravity field recovery are investigated. The project team is composed of members from science and industry, bringing together experts in geodesy, satellite systems, metrology, sensor technology and control systems. The majority of team members already contributed to former gravity missions. The composition of the team guarantees that not only geodetic aspects and objectives are investigated, but also technological and financial constraints are considered. Conversely, satellite, sensor and system concepts are developed and improved in a direct exchange with geodetic and scientific claims. The project aims to develop concepts for both near and mid-term future satellite missions, taking into account e.g. advanced satellite formations and constellations, improved orbit design, innovative metrology and sensor systems and advances in satellite systems.

  9. Causes of Construction Delays in Qatar Construction Projects

    OpenAIRE

    Murat Gunduz; Mohanad H. A. AbuHassan

    2016-01-01

    Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction ...

  10. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  11. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  12. The AAU-cubesat Student Satellite Project: Architectual Overview and Lessons Learnt

    DEFF Research Database (Denmark)

    Østergaard, Kasper Zinck; Alminde, Lars; Bisgaard, Morten

    satellite like the AAU-cubesat. Results from the operation phase will be stated, and recommendations on further work on pico-satellite designs will be given. In addition as the project has been carried through by students, the educational value of the project will be addressed as well....

  13. Organizational analysis of construction projects

    OpenAIRE

    Hughes, Will

    1989-01-01

    This research project is about the analysis of construction project organizations. The work is based on organizational theory and is a development of Linear Responsibility Analysis (LRA). The aim is to assess the extent to which project success is affected by organizational structure. The analysis of four public sector case studies raises several issues. First is the need for a systematic model of describing and analysing construction project environments. A framework has been developed that ...

  14. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  15. Construction Managers’ Perception of the Factors Affecting Sustainability in Construction Projects

    OpenAIRE

    Reza Taheriattar; Morvarid Farzanehrafat

    2014-01-01

    Sustainable construction is a comprehensive concept which requires long-term planning. Moreover, construction managers play a key role in leading, planning and scheduling of a construction project. As a result, sustainability of construction projects can be affected by construction managers’ decisions. In addition, for greater development of sustainable construction, affecting factors should firstly be notified. Therefore, it seems necessary to investigate construction managers’ perception of...

  16. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  17. Advanced mobile satellite communications system using Ka and MM-wave bands in Japan's R and D satellite project

    Science.gov (United States)

    Isobe, Shunkichi; Ohmori, Shingo; Hamamoto, Naokazu; Yamamoto, Minoru

    1991-01-01

    Communications Research Laboratory (CRL) studied an advanced mobile satellite communications system using Ka and millimeter-wave bands in the R&D Satellite project. The project started in 1990 and the satellite will be launched in 1997. On-board multi-beam interconnecting is one of basic functions to realize one-hop connection among Very Small Aperture Terminals (VSATs), mobile, and hand-held terminals in future mobile satellite communications system. An Intermediate Frequency (IF) filter bank and regenerative transponder are suitable for this function. The transponder configuration of an advanced mobile communications mission of the R&D Satellite for experiment is shown. High power transmitters of Ka and millimeter-wave bands, a 3x3 IF filter band and Single Channel Per Carrier/Time Division Multiplexing (SCPC/TDM) regenerative MODEMS, which will be boarded on the R&D Satellite, are being developed for the purpose of studying the feasibility of advanced mobile communications system.

  18. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  19. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  20. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  1. Time Overrun in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  2. Normalization and calibration of geostationary satellite radiances for the International Satellite Cloud Climatology Project

    Science.gov (United States)

    Desormeaux, Yves; Rossow, William B.; Brest, Christopher L.; Campbell, G. G.

    1993-01-01

    Procedures are described for normalizing the radiometric calibration of image radiances obtained from geostationary weather satellites that contributed data to the International Satellite Cloud Climatology Project. The key step is comparison of coincident and collocated measurements made by each satellite and the concurrent AVHRR on the 'afternoon' NOAA polar-orbiting weather satellite at the same viewing geometry. The results of this comparison allow transfer of the AVHRR absolute calibration, which has been established over the whole series, to the radiometers on the geostationary satellites. Results are given for Meteosat-2, 3, and 4, for GOES-5, 6, and 7, for GMS-2, 3, and 4 and for Insat-1B. The relative stability of the calibrations of these radiance data is estimated to be within +/- 3 percent; the uncertainty of the absolute calibrations is estimated to be less than 10 percent. The remaining uncertainties are at least two times smaller than for the original radiance data.

  3. Construction project management handbook : September 2009.

    Science.gov (United States)

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  4. Experience and Methodology gained from 4 years of Student Satellite Projects

    DEFF Research Database (Denmark)

    Alminde, Lars; Bisgaard, Morten; Bhanderi, Dan

    2005-01-01

    The AAU Cubesat student satellite project at Aalborg University was initiated in September 2001 and led to the launch of the satellite on the 30th of June 2003 with a “Rockot” rocket from Plesetsk in Russia. The satellite survived three months in orbit and based on the experiences gained the next...

  5. Qinshan CANDU project open top construction method

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Wittann, K.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The significant schedule reductions achieved on the Qinshan CANDU Project were due in large part to the incorporation of advanced construction technologies in project design and delivery. For the Qinshan Project, a number of key advantages were realized through the use of the 'Open Top' construction method. This paper discusses the Qinshan Phase III CANDU Project Open Top implementation method. The Open Top method allowed major equipment to be installed simply, via the use of a Very Heavy Lift (VHL) crane and permitted the use of large-scale modularization. The advantages of Open Top construction, such as simplified access, more flexible project scheduling, improved construction safety and quality, and reduced labours are presented. The large-scale modularization of the Reactor Building Dousing System and the Open Top installation method and advantages relative to traditional CANDU 6 construction practices are also presented. Finally, major improvements for future CANDU plant construction using the Open Top method are discussed. (author)

  6. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  7. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  8. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  9. Radioactive materials in construction projects

    International Nuclear Information System (INIS)

    Herrmann, Ralf; Ohlendorf, Frank; Kaltz, Andrea Christine

    2014-01-01

    Till 1990 residues often of the former uranium mining were partly used as building material for road construction, terrain compensation and house construction in Saxony. These recommendations for action are addressed to applicants, planners and building constructors in the engineering and construction sector. It provides information for planning, preliminary investigations, applications, construction supervision related to radiation protection measures and documentation of construction projects where radioactive materials are expected.

  10. Effect of bond administration on construction project delivery

    Directory of Open Access Journals (Sweden)

    Oke Ayodeji Emmanuel

    2016-12-01

    Full Text Available Construction bond administration involves management of bond issues from inception of obtaining bond from guarantor to the point of release of contractor by the client. This process has posted a lot of challenges to construction stakeholders; it is therefore, necessary to examine the relationship between bond administration and project success. Archival data of completed bonded building projects were gathered through a pro forma developed for this purpose. Using Pearson product moment of correlation, it was revealed that the cost of securing a construction bond has a positive and significant effect on the initial and final costs of the project, while the number of days needed to secure a construction bond has no significant effect on the initial and final durations of the construction project. In order to establish the relationship between project delivery indices of cost and time and the construction bond administration variables, iteration of linear regression was adopted to arrive at the best-fit equation. Factors affecting the cost of securing construction bonds from guarantors should be identified and given adequate attention by construction stakeholders in order to minimize the effect of construction bond administration on project delivery.

  11. Satellite based Ocean Forecasting, the SOFT project

    Science.gov (United States)

    Stemmann, L.; Tintoré, J.; Moneris, S.

    2003-04-01

    The knowledge of future oceanic conditions would have enormous impact on human marine related areas. For such reasons, a number of international efforts are being carried out to obtain reliable and manageable ocean forecasting systems. Among the possible techniques that can be used to estimate the near future states of the ocean, an ocean forecasting system based on satellite imagery is developped through the Satelitte based Ocean ForecasTing project (SOFT). SOFT, established by the European Commission, considers the development of a forecasting system of the ocean space-time variability based on satellite data by using Artificial Intelligence techniques. This system will be merged with numerical simulation approaches, via assimilation techniques, to get a hybrid SOFT-numerical forecasting system of improved performance. The results of the project will provide efficient forecasting of sea-surface temperature structures, currents, dynamic height, and biological activity associated to chlorophyll fields. All these quantities could give valuable information on the planning and management of human activities in marine environments such as navigation, fisheries, pollution control, or coastal management. A detailed identification of present or new needs and potential end-users concerned by such an operational tool is being performed. The project would study solutions adapted to these specific needs.

  12. Using a tag team of undergraduate researchers to construct an empirical model of auroral Poynting flux, from satellite data

    Science.gov (United States)

    Cosgrove, R. B.; Bahcivan, H.; Klein, A.; Ortega, J.; Alhassan, M.; Xu, Y.; Chen, S.; Van Welie, M.; Rehberger, J.; Musielak, S.; Cahill, N.

    2012-12-01

    Empirical models of the incident Poynting flux and particle kinetic energy flux, associated with auroral processes, have been constructed using data from the FAST satellite. The models were constructed over a three-year period by a tag-team of three groups of undergraduate researchers from Worcester Polytechnic Institute (WPI), working under the supervision of researchers at SRI International, a nonprofit research institute. Each group spent one academic quarter in residence at SRI, in fulfillment of WPI's Major Qualifying Project (MQP), required for graduation from the Department of Electrical and Computer Engineering. The MQP requires a written group report, which was used to transition from one group to the next. The student's research involved accessing and processing a data set of 20,000 satellite orbits, replete with flaws associated with instrument failures, which had to be removed. The data had to be transformed from the satellite reference frame into solar coordinates, projected to a reference altitude, sorted according to geophysical conditions, and etc. The group visits were chaperoned by WPI, and were jointly funded. Researchers at SRI were supported by a grant from the National Science Foundation, which was tailored to accommodate the undergraduate tag-team approach. The NSF grant extended one year beyond the student visits, with increased funding in the final year, permitting the researchers at SRI to exercise quality control, and to produce publications. It is expected that the empirical models will be used as inputs to large-scale general circulation models (GCMs), to specify the atmospheric heating rate at high altitudes.; Poynting Flux with northward IMF ; Poynting flux with southward IMF

  13. The Role of Ground-Based Robotic Observatories in Satellite Projects

    Czech Academy of Sciences Publication Activity Database

    Hudec, René

    2010-01-01

    Roč. 2010, - (2010), 594854/1-594854/10 ISSN 1687-7969 R&D Projects: GA ČR GA205/08/1207 Grant - others:ESA(XE) ESA-PECS project No. 98058 Institutional research plan: CEZ:AV0Z10030501 Keywords : robotic telescopes * satellite projects * INTEGRAL mission Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  14. Application of value engineering technique in construction project

    International Nuclear Information System (INIS)

    Chen Changbing

    2003-01-01

    The author introduces how to apply the theories and methods of the value engineering in construction project. In the construction of a test device of the thermal hydrodynamic process, the authors have greatly reduced the construction cost and shortened the construction period by using the value engineering analyzing method. The application of value engineering in the project management is innovative. This practice indicates that the value engineering is important in many construction projects

  15. An examination of fuel consumption trends in construction projects

    International Nuclear Information System (INIS)

    Peters, Valerie A.; Manley, Dawn K.

    2012-01-01

    Recent estimates of fuel consumption in construction projects are highly variable. Lack of standards for reporting at both the equipment and project levels make it difficult to quantify the magnitude of fuel consumption and the associated opportunities for efficiency improvements in construction projects. In this study, we examined clusters of Environmental Impact Reports for seemingly similar construction projects in California. We observed that construction projects are not characterized consistently by task or equipment. We found wide variations in estimates for fuel use in terms of tasks, equipment, and overall projects, which may be attributed in part to inconsistencies in methodology and parameter ranges. Our analysis suggests that standardizing fuel consumption reporting and estimation methodologies for construction projects would enable quantification of opportunities for efficiency improvements at both the equipment and project levels. With increasing emphasis on reducing fossil fuel consumption, it will be important to quantify opportunities to increase fuel efficiency, including across the construction sector. - Highlights: ► An analysis of construction projects reveals inconsistencies in fuel use estimates. ► Fuel consumption estimates for similar construction equipment can vary greatly. ► Standards would help to quantify efficiency opportunities in construction.

  16. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  17. Science operations management. [with Infrared Astronomy Satellite project

    Science.gov (United States)

    Squibb, G. F.

    1984-01-01

    The operation teams engaged in the IR Astronomical Satellite (IRAS) project included scientists from the IRAS International Science Team. The detailed involvement of these scientists in the design, testing, validation, and operations phases of the IRAS mission contributed to the success of this project. The Project Management Group spent a substantial amount of time discussing science-related issues, because science team coleaders were members from the outset. A single scientific point-of-contact for the Management Group enhanced the depth and continuity of agreement reached in decision-making.

  18. Exploring delay causes of road construction projects in

    Directory of Open Access Journals (Sweden)

    Remon F. Aziz

    2016-06-01

    Full Text Available Construction delays are a common phenomenon in civil engineering projects in Egypt including road construction projects. Therefore, it is essential to study and analyze causes of road construction delays. This paper studied a list of construction delay causes gathered from literature having different types of construction, different countries, different periods and different numbers of delay causes and delay groups. A questionnaire and personal interviews have formed the basis of this paper listing 293 delay causes. The questionnaire survey was distributed to 500 construction participants and 389 were received who represent consultants, contractors and site/design engineers excluding the owner representing the government in road projects as one party only. Relative Importance Index (RII is calculated and according to the highest values the top twenty and the least twenty delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the paper. The test results reveal good correlation of causes and groups between contractors and site/design engineers and between consultants and site design engineers and a somewhat low correlation between contractors and consultants. So there are no root causes that can be taking for granted to be most or least effective delay causes. Proposed model for predicting actual road construction project duration was developed; a real case study tested the accuracy of proposed model. According to the analysis of case study, the most contributing causes and groups to delays were discussed, and some future recommendations were proposed in order to control and minimize delays in road construction projects. These findings can be helpful for project managers to mitigate the road construction delays in Egypt. In order to effectively overcome the road construction delays in developing countries, suggestions are made for fundamental and large

  19. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  20. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    Directory of Open Access Journals (Sweden)

    Ngah Nasaruddin Nur Ain

    2016-01-01

    Full Text Available Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. Literature work found that 11 leadership qualities to ensure construction project success. From the frequency analysis, five most dominant leadership qualities are team building, communication skill, visioning, planning & strategy skill, and decision making. Beside the literature, this study also seeks an opinion from a senior leader of a successful construction company regarding the need of these qualities amongst parties to resolve the construction issues. The results from an interview session indicate that he fully agreed with the need of all the qualities in the construction industry. This shows that there is a strong relationship between solving the issues with the leadership quality in ensuring construction project success. These qualities should be further investigated to acquire a better representation of leadership quality in resolving construction issues for Malaysia construction industry.

  1. Direct Satellite Data Acquisition and its Application for Large -scale Monitoring Projects in Russia

    Science.gov (United States)

    Gershenzon, O.

    2011-12-01

    ScanEx RDC created an infrastructure (ground stations network) to acquire and process remote sensing data from different satellites: Terra, Aqua, Landsat, IRS-P5/P6, SPOT 4/5, FORMOSAT-2, EROS A/B, RADARSAT-1/2, ENVISAT-1. It owns image archives from these satellites as well as from SPOT-2 and CARTOSAT-2. ScanEx RDC builds and delivers remote sensing ground stations (working with up to 15 satellites); and owns the ground stations network to acquire data for Russia and surrounding territory. ScanEx stations are the basic component in departmental networks of remote sensing data acquisition for different state authorities (Roshydromet, Ministry of Natural Recourses, Emercom) and University- based remote sensing data acquisition and processing centers in Russia and abroad. ScanEx performs large-scale projects in collaboration with government agencies to monitor forests, floods, fires, sea surface pollution, and ice situation in Northern Russia. During 2010-2011 ScanEx conducted daily monitoring of wild fires in Russia detecting and registering thermal anomalies using data from Terra, Aqua, Landsat and SPOT satellites. Detailed SPOT 4/5 data is used to analyze burnt areas and to assess damage caused by fire. Satellite data along with other information about fire situation in Russia was daily updated and published via free-access Internet geoportal. A few projects ScanEx conducted together with environmental NGO. Project "Satellite monitoring of Especially Protected Natural Areas of Russia and its results visualization on geoportal was conducted in cooperation with NGO "Transparent World". The project's goal was to observe natural phenomena and economical activity, including illegal, by means of Earth remote sensing data. Monitoring is based on multi-temporal optical space imagery of different spatial resolution. Project results include detection of anthropogenic objects that appeared in the vicinity or even within the border of natural territories, that have never been

  2. Influential Factors Affecting Materials Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Jusoh Zairra Mat

    2017-12-01

    Full Text Available Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1 site condition; (2 planning and handling on site; (3 management; (4 materials; (5 supplier and manufacturer default; (6 transportation; (7 contractual; and (8 governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.

  3. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  4. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  5. Exploitation and Benefits of BIM in Construction Project Management

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  6. Benchmarking Sustainability Practices Use throughout Industrial Construction Project Delivery

    Directory of Open Access Journals (Sweden)

    Sungmin Yun

    2017-06-01

    Full Text Available Despite the efforts for sustainability studies in building and infrastructure construction, the sustainability issues in industrial construction remain understudied. Further, few studies evaluate sustainability and benchmark sustainability issues in industrial construction from a management perspective. This study presents a phase-based benchmarking framework for evaluating sustainability practices use focusing on industrial facilities project. Based on the framework, this study quantifies and assesses sustainability practices use, and further sorts the results by project phase and major project characteristics, including project type, project nature, and project delivery method. The results show that sustainability practices were implemented higher in the construction and startup phases relative to other phases, with a very broad range. An assessment by project type and project nature showed significant differences in sustainability practices use, but no significant difference in practices use by project delivery method. This study contributes to providing a benchmarking method for sustainability practices in industrial facilities projects at the project phase level. This study also discusses and provides an application of phase-based benchmarking for sustainability in industrial construction.

  7. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  8. Construction Project Leadership from the Perspective of Islam

    OpenAIRE

    MUHAMAD ROSDI SENAM; KHAIRUDDIN ABDUL RASHID; AZILA AHMAD SARKAWI; RAPIAH MOHD. ZAINI

    2014-01-01

    Construction industry is continuously being accused with common issues such as low performance, corruptions, spillages, bad practices in addition to common project failures despite advances in project management tools and techniques. This further adds to the existing and increasing complex and multi-facets business environment in construction projects that has resulted in the increasing pressure and challenges faced by project leaders and project managers today. Researchers in project managem...

  9. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  10. Technology Management on Large Construction Projects

    DEFF Research Database (Denmark)

    Bonke, Sten

    The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...

  11. Bi-project management in engineering complex industrial construction projects

    NARCIS (Netherlands)

    Velde, Robert R. van der; Donk, Dirk Pieter van

    2000-01-01

    Engineering large industrial construction projects is usually a complex task with several co-operating actors. This paper investigates such projects, characterised by two main actors: the owner of the installation (the client organisation) responsible for the engineering of the production process,

  12. Optimizing strategy for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of a contractor’s view such as: proposed project duration with corresponding gross value and cash flows. Cash flow analysis of construction projects has a long history and has been an important topic in construction management. Determination of project cash flows is very sensitive, especially for repetitive construction projects. This paper focuses on how to calculate tender data for repetitive construction projects such as: project duration, project cost, project/bid price, project cash flows, project maximum working capital and project net present value that is equivalent to net profit at the beginning of the project. A simplified multi-objective optimization formulation will be presented that creates best tender data to contractor comparing with more feasible options that are generated from multi-mode resources in a given project. This mathematical formulation is intended to give more scenarios which provide a practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price and project maximum working capital while maximizing its net present value simultaneously. At the end of the paper, an illustrative example will be presented to demonstrate the applications of proposed technique to an optimization expressway of repetitive construction project.

  13. The UNOSAT-GRID Project: Access to Satellite Imagery through the Grid Environment

    CERN Document Server

    Méndez-Lorenzo, P; Lamanna, M; Meyer, X; Lazeyras, M; Bjorgo, E; Retiere, A; Falzone, A; Venuti, N; Maccarone, S; Ugolotti, B

    2007-01-01

    UNOSAT is a United Nations activity to provide access to satellite images and geographic system services for humanitarian operations for rescue or aid activities. UNOSAT is implemented by the UN Institute for Training and Research (UNITAR) and managed by the UN Office for Project Services (UNOPS). In addition, partners from different organizations constitute the UNOSAT consortium. Among these partners, CERN participates actively providing the required computational and storage resources. The critical part of the UNOSAT activity is the storage and processing of large quantities of satellite images. The fast and secure access to these images from any part of the world is mandatory during these activities. Based on two successful CERN-GRID/UNOSAT pilot projects (data storage/compression/download and image access through mobile phone), the GRIDUNOSAT project has consolidated the considerable work undertaken so far in the present activity. The main use case already demonstrated is the delivery of satellite images ...

  14. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  15. University Satellite Consortium and Space Education in Japan Centered on Micro-Nano Satellites

    Science.gov (United States)

    Nakasuka, S.; Kawashima, R.

    2002-01-01

    the space development. activities, including how to acquire frequency permission, how to obtain launch opportunity and financial support, how to operate the launched satellites using cheap ground stations, etc. Especially, the frequency problem should be solved as soon as possible because so many universities in the world are planning similar projects and the frequency in the amateur band are already very congested. One idea is that universities should make a world wide "university satellite community" and collaboratively ask for a kind of "Educational frequency" to ITU, and share the obtained frequency within the community under the community's own management. This kind of community will also be useful for collaborative satellite operation, because the universities which have a ground station spread over the world. I hope the IAC meeting will provide a good opportunity for discussing these problems and facilitating the construction of world wide university community to tackle with these problems.

  16. Informal worker phenomenon in housing construction project

    Science.gov (United States)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  17. Construction Project Leadership from the Perspective of Islam

    Directory of Open Access Journals (Sweden)

    MUHAMAD ROSDI SENAM

    2014-12-01

    Full Text Available Construction industry is continuously being accused with common issues such as low performance, corruptions, spillages, bad practices in addition to common project failures despite advances in project management tools and techniques. This further adds to the existing and increasing complex and multi-facets business environment in construction projects that has resulted in the increasing pressure and challenges faced by project leaders and project managers today. Researchers in project management literature calls for more project leadership research as leadership now is increasingly recognised as project success factor. Ethical dilemma and leadership crisis facing the project managers and business organisations reveals the shortcomings and inadequacies of the conventional non-Islamic leadership that is believed to be or that has not fully considered the religious, spiritual, moral and ethical dimensions. Examples of these theories of leadership are authentic leadership, servant leadership and ethical leadership. Therefore, recent trend from literature has implicitly suggested a new form of leadership for construction project manager which is spiritual, moral, values and ethical form of leadership. The uniqueness of Islam is that it does not separate religion and other aspects of human life activities. Construction and project activities are part of the whole economic and social transactions of a nation and thus it is part of Islam. Project management in particular leadership awaits divine intervention that is tied to God consciousness and accords with values and principles prescribed in the Quran and Sunnah. This research is intended to overcome the spiritual and religious shortcomings of the present leadership models by proposing an Islamic perspective of leadership for construction project manager.

  18. Analyzing delay causes in Egyptian construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2014-01-01

    Full Text Available Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor’s organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented.

  19. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  20. Ozone Satellite Data Synergy and Combination with Non-satellite Data in the AURORA project

    Science.gov (United States)

    Cortesi, U.; Tirelli, C.; Arola, A.; Dragani, R.; Keppens, A.; Loenen, E.; Masini, A.; Tsiakos, , C.; van der A, R.; Verberne, K.

    2017-12-01

    The geostationary satellite constellation composed of TEMPO (North America), SENTINEL-4 (Europe) and GEMS (Asia) missions is a major instance of space component in the fundamentally new paradigm aimed at integrating information on air quality from a wide variety of sources. Space-borne data on tropospheric composition from new generation satellites have a growing impact in this context because of their unprecedented quantity and quality, while merging with non-satellite measurements and other types of auxiliary data via state-of-the-art modelling capabilities remains essential to fit the purpose of highly accurate information made readily available at high temporal and spatial resolution, both in analysis and forecast mode. Proper and effective implementation of this paradigm poses severe challenges to science, technology and applications that must be addressed in a closely interconnected manner to pave the way to high quality products and innovative services. Novel ideas and tools built on these three pillars are currently under investigation in the AURORA (Advanced Ultraviolet Radiation and Ozone Retrieval for Applications) Horizon 2020 project of the European Commission. The primary goal of the project is the proof of concept of a synergistic approach to the exploitation of Sentinel-4 and -5 Ozone measurements in the UV, Visible and Thermal Infrared based on the combination of an innovative data fusion method and assimilation models. The scientific objective shares the same level of priority with the technological effort to realize a prototype data processor capable to manage the full data processing chain and with the development of two downstream applications for demonstration purposes. The presentation offers a first insight in mid-term results of the project, which is mostly based on the use of synthetic data from the atmospheric Sentinels. Specific focus is given to the role of satellite data synergy in integrated systems for air quality monitoring, in

  1. The construction project manager in South Africa: Analysis of ...

    African Journals Online (AJOL)

    Journal Home > Vol 22, No 1 (2015) > ... Construction project managers in the built environment come from various backgrounds and knowledge bases; therefore, the project managers' project ... Industry-specific guidelines for construction project management (PMBOK and SACPCMP) were obtained and analysed.

  2. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  3. Satellite-based laser windsounder

    International Nuclear Information System (INIS)

    Schultz, J.F.; Czuchlewski, S.J.; Quick, C.R.

    1997-01-01

    This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The project''s primary objective is to determine the technical feasibility of using satellite-based laser wind sensing systems for detailed study of winds, aerosols, and particulates around and downstream of suspected proliferation facilities. Extensive interactions with the relevant operational organization resulted in enthusiastic support and useful guidance with respect to measurement requirements and priorities. Four candidate wind sensing techniques were evaluated, and the incoherent Doppler technique was selected. A small satellite concept design study was completed to identify the technical issues inherent in a proof-of-concept small satellite mission. Use of a Mach-Zehnder interferometer instead of a Fabry-Perot would significantly simplify the optical train and could reduce weight, and possibly power, requirements with no loss of performance. A breadboard Mach-Zehnder interferometer-based system has been built to verify these predictions. Detailed plans were made for resolving other issues through construction and testing of a ground-based lidar system in collaboration with the University of Wisconsin, and through numerical lidar wind data assimilation studies

  4. Multi-objective genetic optimization of linear construction projects

    Directory of Open Access Journals (Sweden)

    Fatma A. Agrama

    2012-08-01

    Full Text Available In the real world, the majority cases of optimization problems, met by engineers, are composed of several conflicting objectives. This paper presents an approach for a multi-objective optimization model for scheduling linear construction projects. Linear construction projects have many identical units wherein activities repeat from one unit to another. Highway, pipeline, and tunnels are good examples that exhibit repetitive characteristics. These projects represent a large portion of the construction industry. The present model enables construction planners to generate optimal/near-optimal construction plans that minimize project duration, total work interruptions, and total number of crews. Each of these plans identifies, from a set of feasible alternatives, optimal crew synchronization for each activity and activity interruptions at each unit. This model satisfies the following aspects: (1 it is based on the line of balance technique; (2 it considers non-serial typical activities networks with finish–start relationship and both lag or overlap time between activities is allowed; (3 it utilizes a multi-objective genetic algorithms approach; (4 it is developed as a spreadsheet template that is easy to use. Details of the model with visual charts are presented. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing the scheduling of linear construction projects.

  5. The Baselines Project: Establishing Reference Environmental Conditions for Marine Habitats in the Gulf of Mexico using Forecast Models and Satellite Data

    Science.gov (United States)

    Jolliff, J. K.; Gould, R. W.; deRada, S.; Teague, W. J.; Wijesekera, H. W.

    2012-12-01

    We provide an overview of the NASA-funded project, "High-Resolution Subsurface Physical and Optical Property Fields in the Gulf of Mexico: Establishing Baselines and Assessment Tools for Resource Managers." Data assimilative models, analysis fields, and multiple satellite data streams were used to construct temperature and photon flux climatologies for the Flower Garden Banks National Marine Sanctuary (FGBNMS) and similar habitats in the northwestern Gulf of Mexico where geologic features provide a platform for unique coral reef ecosystems. Comparison metrics of the products to in situ data collected during complimentary projects are also examined. Similarly, high-resolution satellite-data streams and advanced processing techniques were used to establish baseline suspended sediment load and turbidity conditions in selected northern Gulf of Mexico estuaries. The results demonstrate the feasibility of blending models and data into accessible web-based analysis products for resource managers, policy makers, and the public.

  6. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  7. The application of micro UAV in construction project

    Science.gov (United States)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  8. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  9. Kids Interactive Telecommunications Project by Satellite (KITES): A Telecommunications Partnership To Empower Middle School Students.

    Science.gov (United States)

    LeBaron, John

    Kids Interactive Telecommunications Project by Satellite (KITES) is a cooperative international telecommunications partnership involving the University of Lowell, Digital's corporate video network, Videostar Connections Inc. (a satellite networking broker), PanAmSat (a satellite operator), and several other public education institutions in…

  10. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  11. A Framework for Coordination Process into Construction Projects

    Directory of Open Access Journals (Sweden)

    Alaloul Wesam S.

    2016-01-01

    Full Text Available Construction industry is recognized as high fragmentation, low efficiency, cost and time overruns in contrast with other industries. These peculiarities are the main roots of poor performance facing by the industry. Effective coordination is vital in construction projects success and mitigate the fragmentation dilemma, however it is often difficult to achieve and need iterative process. Coordination is core issue to improve performance in construction project. Relevant studies have addressed the coordination process importance and implementation, but not in a framework. This paper propose a framework for coordination process in construction projects, as well as its relationship with performance. The objective of the framework is to provide a roadmap for the construction parties to realize operational excellence so that collectively stakeholders can recognize the effect of coordination process application on the project performance. The data were obtained from literature review and structured interviews with five experts. The analysis produced the framework of coordination based on the extensively used procedures for information and data flow between stakeholders.

  12. Construction Management of Electromechanical Engineering Project in Petrochemical Construction

    Directory of Open Access Journals (Sweden)

    Xi Tao

    2017-03-01

    Full Text Available Petrochemical industry as a basic industry, occupies a pivotal position in the national economy, with the continuous development of science and technology, electromechanical automation in the petrochemical industry has been widely used to save a lot of labor but also greatly improve the oil Chemical industry production efficiency. Therefore, in the construction of petrochemical industry, mechanical and electrical engineering as part of it. It plays a vital role. Petrochemical industry with the production of high temperature and high pressure and flammable and explosive gas, can strengthen the construction of mechanical and electrical engineering specialization and construction management of scientific, has become the relationship between the smooth development of mechanical and electrical engineering and engineering quality of the key, A direct impact on the petrochemical construction of the overall construction quality. To this end, it is necessary for the construction of petrochemical construction of electromechanical engineering construction management to promote the construction of mechanical and electrical engineering management level gradually increased. This article on the machine Electric engineering project construction management were discussed with a view to the petrochemical construction in the relevant aspects of the need to provide reference for reference.

  13. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Science.gov (United States)

    2010-07-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental issues...

  14. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    Science.gov (United States)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  15. Knowledge Management Practice on Construction Project ...

    African Journals Online (AJOL)

    Likewise, the results further indicated 19 benefits of KM practice for improving construction project performance and include: improve project quality, cost and time; practice and process improvement; encourage effective teamwork and innovation; improve the client satisfaction; boost productivity of employees and processes; ...

  16. 7 CFR 1726.403 - Project construction contract closeout.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on... American” certificate. (iii) RUS Form 224, Waiver and Release of Lien, from each manufacturer, supplier...

  17. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  18. Causes of Low-Skilled Workers’ Performance in Construction Projects

    OpenAIRE

    Alhaji Ali Zannah; Aryani Ahmad Latiffi; Abdulazeez Umar Raji; Abdullahi Abba Waziri; Usman Mohammed 4

    2017-01-01

    Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achie...

  19. 42 CFR 137.362 - May construction project agreements be amended?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May construction project agreements be amended? 137... of the Secretary in Establishing and Implementing Construction Project Agreements § 137.362 May construction project agreements be amended? Yes, the Self-Governance Tribe, at its discretion, may request the...

  20. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  1. REVIEW ON CONSTRUCTION PROJECT MANAGEMENT SOFTWARE PRIMAVERA P6

    OpenAIRE

    Piyush Pramod Bagade* & Prof. Abhijit Bhirud

    2018-01-01

    Planning, scheduling and Resource levelling plays an important role in any construction project maybe it is construction of building or construction of road. In absence of proper planning, scheduling and resource levelling construction industry does not get profit over the project. For this purpose, proper software’s and techniques must be utilize. This paper is focussing on the advantages of Oracle Primavera P6 Software. The latest version of Primavera is P6-17. In any construction work huge...

  2. Waste diminution in Construction projects: Environmental Predicaments

    Science.gov (United States)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  3. International Satellite Cloud Climatology Project (ISCCP) Climate Data Record, H-Series

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The International Satellite Cloud Climatology Project (ISCCP) focuses on the distribution and variation of cloud radiative properties to improve the understanding of...

  4. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    OpenAIRE

    Ngah Nasaruddin Nur Ain; Abdul Rahman Ismail

    2016-01-01

    Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. ...

  5. Construction of special structures for nuclear power projects

    International Nuclear Information System (INIS)

    Raghavan, N.

    2003-01-01

    Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)

  6. The Iodine Satellite (iSat) Project Development Towards Critical Design Review

    Science.gov (United States)

    Dankanich, John W.; Calvert, Derek; Kamhawi, Hani; Hickman, Tyler; Szabo, James; Byrne, Lawrence

    2015-01-01

    Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.

  7. Leveraging Text Content for Management of Construction Project Documents

    Science.gov (United States)

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  8. The Iodine Satellite (iSat) Project Development Towards Critical Design Review (CDR)

    Science.gov (United States)

    Dankanich, John W.; Selby, Michael; Polzin, Kurt A.; Kamhawi, Hani; Hickman, Tyler; Byrne, Larry

    2016-01-01

    Despite the prevalence of Small Satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy (i.e. high pressure vessels). These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U configuration under the Small Spacecraft Technology Program. The project formally began in FY15 as a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is in final preparation of the Critical Design Review prior to initiating the fabrication and integration phase of the project. The iSat project is on schedule for a launch opportunity in November 2017.

  9. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    Directory of Open Access Journals (Sweden)

    Mohamed Marzouk

    2017-05-01

    Full Text Available Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG footprint, eutrophication potential (EP, acidification potential (AP, human health (HH particulate, ozone depletion, and smog. Each of these environmental impact indicators can be linked to different phases of the construction projects. The overall environmental impact indicators can be divided into direct, indirect, and operational emissions. This paper presents a Building Information Modeling (BIM-based methodology for the assessment of environmental impacts in road construction projects. The model takes into account the overall life cycle of the road construction project, which is divided into: manufacturing phase, transportation phase, construction phase, maintenance phase, operational phase, recycling phase, and deconstruction phase. A case study is presented to demonstrate the applicability of the proposed model. The proposed model solves a major problem for road construction project teams who want to assess the environmental impact indicators associated with their project prior to the start of the execution of their projects.

  10. Quality Management System at Construction Project: A Questionnaire Survey

    OpenAIRE

    P.P.Mane; J.R.Patil

    2015-01-01

    The best quality, time and cost are the important aspects of successful construction project which fulfills the main goal of construction industry. The quality management has to provide the environment within which related tools, techniques and procedures can be deployed effectively leading to operational success for a construction project. The role of quality management for a construction company is not an isolated activity, but intertwined with all the operational and managerial...

  11. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  12. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  13. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  14. Expansive Learning in Construction Projects - a Contradiction in terms?

    DEFF Research Database (Denmark)

    Klitgaard, Anne; Nissen, Søren Bülow; Beck, Frederikke

    2016-01-01

    This research is a preliminary study performed as part of a primary research into expansive learning in interorganizational network set up to solve a construction project. The construction industry has long had issues about productivity, which can be an indication of lack of learning. A case study...... acquisition and participation but not by expansive learning. The construction industry needs to accept that the learning generated from projects will be limited to learning by acquisition and participation. The interorganizational network cannot facilitate expansive learning while working on object......-fixed projects. Research in construction management fails to generate and document knowledge because of the limitations of case studies....

  15. Exploitation of cloud computing in management of construction projects in Slovakia

    Directory of Open Access Journals (Sweden)

    Mandičák Tomáš

    2016-12-01

    Full Text Available The issue of cloud computing is a highly topical issue. Cloud computing represents a new model for information technology (IT services based on the exploitation of Web (it represents a cloud and other application platforms, as well as software as a service. In general, the exploitation of cloud computing in construction project management has several advantages, as demonstrated by several research reports. Currently, research quantifying the exploitation of cloud computing in the Slovak construction industry has not yet been carried out. The article discusses the issue of exploitation of cloud computing in construction project management in Slovakia. The main objective of the research is to confirm whether factors such as size of construction enterprise, owner of construction enterprise and participant of construction project have any impact on the exploitation level of cloud computing in construction project management. It includes confirmation of differences in use between different participants of the construction project or between construction enterprises broken down by size and shareholders.

  16. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  17. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  18. Determinants of construction project success in India

    CERN Document Server

    Jha, Kumar Neeraj

    2013-01-01

    This study presents exploratory work and seeks to identify and evaluate the success and failure factors that could form a guideline for further study and to some extent help professionals to understand some critical aspects that impact project performance concerning construction in India. A total of 55 attributes affecting the performance of construction projects are analysed in terms of their level of influence on four key performance criteria – schedule, cost, quality, and no disputes – using a two-stage questionnaire survey. These attributes are then further analysed, interpreted and evaluated.   Based on the critical success factors obtained from the study, a neural network model-based predictive model for project performance has been developed. The performance prediction models have been derived for all four project performance criteria. Further, a hypothesis that ‘project success’ is influenced by ‘success traits’ has also been formulated. The hypothesized positive inter-relationships betwe...

  19. Client's constraining factors to construction project management ...

    African Journals Online (AJOL)

    This study analyzed client's related factors that constrain project management success of public and private sector construction in Nigeria. Issues that concern clients in any project can not be undermined as they are the owners and the initiators of project proposals. It is assumed that success, failure or abandonment of ...

  20. The C3PO project: a laser communication system concept for small satellites

    Science.gov (United States)

    d'Humières, Benoît; Esmiller, Bruno; Gouy, Yann; Steck, Emilie; Quintana, Crisanto; Faulkner, Graham; O'Brien, Dominic; Sproll, Fabian; Wagner, Paul; Hampf, Daniel; Riede, Wolfgang; Salter, Michael; Wang, Qin; Platt, Duncan; Jakonis, Darius; Piao, Xiaoyu; Karlsson, Mikael; Oberg, Olof; Petermann, Ingemar; Michalkiewicz, Aneta; Krezel, Jerzy; Debowska, Anna; Thueux, Yoann

    2017-02-01

    The satellite market is shifting towards smaller (micro and nanosatellites), lowered mass and increased performance platforms. Nanosatellites and picosatellites have been used for a number of new, innovative and unique payloads and missions. This trend requires new concepts for a reduced size, a better performance/weight ratio and a reduction of onboard power consumption. In this context, disruptive technologies, such as laser-optical communication systems, are opening new possibilities. This paper presents the C3PO1 system, "advanced Concept for laser uplink/ downlink CommuniCation with sPace Objects", and the first results of the development of its key technologies. This project targets the design of a communications system that uses a ground-based laser to illuminate a satellite, and a Modulating Retro-Reflector (MRR) to return a beam of light modulated by data to the ground. This enables a downlink, without a laser source on the satellite. This architecture suits well to small satellite applications so as high data rates are potentially provided with very low board mass. C3PO project aims to achieve data rates of 1Gbit/s between LEO satellites and Earth with a communication payload mass of less than 1kilogram. In this paper, results of the initial experiments and demonstration of the key technologies will be shown.

  1. Measuring the effects of using ICT/BIM in construction projects

    DEFF Research Database (Denmark)

    Lambrecht, Jan Fuglsig; Vestergaard, Flemming; Karlshøj, Jan

    2016-01-01

    This paper focuses on presenting part of the findings from a research project completed in the period of 2009-2013.The research project was funded by the Danish Building & Property Agency with the primary aim to identify and measure the economic effects of using ICT/BIM in construction projects....... Firstly, this paper presents a conceptual evaluation method developed in order to define and describe how case studies focusing on use of ICT/BIM in construction projects could be completed in order to measure (both quantitatively and qualitatively) the effects achieved from using ICT/BIM in construction...... projects. In this context effects are defined both as tangible and intangible effects (both economically and non-economically) directly and/or indirectly as a consequence of using ICT/BIM in a construction project. Secondly, the paper presents and analyses findings achieved from completing four case...

  2. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    Science.gov (United States)

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  3. SOFT project: a new forecasting system based on satellite data

    Science.gov (United States)

    Pascual, Ananda; Orfila, A.; Alvarez, Alberto; Hernandez, E.; Gomis, D.; Barth, Alexander; Tintore, Joaquim

    2002-01-01

    The aim of the SOFT project is to develop a new ocean forecasting system by using a combination of satellite dat, evolutionary programming and numerical ocean models. To achieve this objective two steps are proved: (1) to obtain an accurate ocean forecasting system using genetic algorithms based on satellite data; and (2) to integrate the above new system into existing deterministic numerical models. Evolutionary programming will be employed to build 'intelligent' systems that, learning form the past ocean variability and considering the present ocean state, will be able to infer near future ocean conditions. Validation of the forecast skill will be carried out by comparing the forecasts fields with satellite and in situ observations. Validation with satellite observations will provide the expected errors in the forecasting system. Validation with in situ data will indicate the capabilities of the satellite based forecast information to improve the performance of the numerical ocean models. This later validation will be accomplished considering in situ measurements in a specific oceanographic area at two different periods of time. The first set of observations will be employed to feed the hybrid systems while the second set will be used to validate the hybrid and traditional numerical model results.

  4. Ranking of delay factors in construction projects after Egyptian revolution

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Time is one of the major considerations throughout project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Time delay is a very frequent phenomenon and is almost associated with nearly all constructing projects. However, little effort has been made to curtail the phenomenon, this research work attempts to identify, investigate, and rank factors perceived to affect delays in the Egyptian construction projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, researcher invited practitioners and experts, comprising a statistically representative sample to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of delay factors were identified in construction projects. Totally, ninety-nine (99 factors were short-listed to be made part of the questionnaire survey and were identified and categorized into nine (9 major categories. The survey was conducted with experts and representatives from private, public, and local general construction firms. The data were analyzed using Relative Importance Index (RII, ranking and simple percentages. Ranking of factors and categories was demonstrated according to their importance level on delay, especially after 25/1/2011 (Egyptian revolution. According to the case study results, the most contributing factors and categories (those need attention to delays were discussed, and some recommendations were made in order to minimize and control delays in construction projects. Also, this paper can serve as a guide for all construction parties with effective management in construction projects to achieve a competitive level of quality and a time effective project.

  5. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  6. The communication in industrialised building system (IBS) construction project: Virtual environment

    Science.gov (United States)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  7. TransCom satellite intercomparison experiment: construction of a bias corrected atmospheric CO2 climatology

    NARCIS (Netherlands)

    Saito, R.; Houweling, S.; Patra, P. K.; Belikov, D.; Lokupitiya, R.; Niwa, Y.; Chevallier, F.; Saeki, T.; Maksyutov, S.

    2011-01-01

    A model-based three-dimensional (3-D) climatology of atmospheric CO2 concentrations has been constructed for the analysis of satellite observations, as a priori information in retrieval calculations, and for preliminary evaluation of remote sensing products. The locations of ground-based instruments

  8. Portfolio management for investment projects in the construction industry

    Directory of Open Access Journals (Sweden)

    Kozlov Alexander

    2017-01-01

    Full Text Available The Russian business community has realized the need for project/targeted programme management procedures; therefore, the demand for customized project-oriented management methods goes up. In the meantime, this demand is not supplied in full, and the supply is far from being efficient. Project management methodologies need further improvement, including development of portfolio management processes applicable to investment projects developed and implemented in the construction industry. The article considers General approaches to the formalization of the management of portfolios of investment–construction projects. For the main groups of processes portfolio management (“Formation and alignment”, “Monitoring and control” and “Support and development” deals with their constituent sub-processes. The proposed decomposition can be used for both portfolio construction and investment projects and also has an invariant character, which allows extending the proposed approaches to other system target–oriented and project–oriented management.

  9. Streamlined project closeout for construction at KYTC.

    Science.gov (United States)

    2017-09-01

    Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...

  10. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  11. Construction project investment control model based on instant information

    Institute of Scientific and Technical Information of China (English)

    WANG Xue-tong

    2006-01-01

    Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.

  12. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  13. Research on Green Construction Technology Applied at Guangzhou Hongding Building Project

    Science.gov (United States)

    Lou, Yong Zhong

    2018-06-01

    The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.

  14. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  15. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  16. A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts

    Directory of Open Access Journals (Sweden)

    Ming Shan

    2017-12-01

    Full Text Available Despite the increasing investment in sustainable development over the past decade, a systematic review of sustainable construction project financing is lacking. The objectives of this paper are to conduct a systematic review to examine the policies, practices, and research efforts in the area of sustainable construction project financing, and to explore the potential opportunities for the future research. To achieve these goals, this paper first reviewed the sustainable construction project financing practices implemented by four representative developed economies including the United Kingdom, the United States, Singapore, and Australia. Then, this paper reviewed the efforts and initiatives launched by three international organizations including the United Nations, the Organization for Economic Co-operation and Development, and International Finance Corporation. After that, this paper reviewed the research efforts of sustainable construction project financing published in peer-review journals and books. This paper identified four major research themes within this area, which are the review of financial stakeholders and market of sustainable construction, benefits and barriers to sustainable construction project financing, financial vehicles for sustainable construction projects, innovative models and mechanisms for sustainable construction project financing. Additionally, this paper revealed five directions for the future research of sustainable construction project financing, which are the identification of financial issues in sustainable construction projects, the investigation of financial vehicles for sustainable construction projects in terms of their strengths, limitations, and performances, the examination of critical drivers for implementing sustainable construction project financing, the development of a knowledge-based decision support system for implementing sustainable construction financing, and the development of best practices for

  17. Motivating Students to Develop Satellites in a Problem and Project-Based Learning Environment

    DEFF Research Database (Denmark)

    Larsen, Jesper Abildgaard; Nielsen, Jens Frederik Dalsgaard; Zhou, Chunfang

    2013-01-01

    During the last decade, a total of three student satellites have been developed by engineering students in a Problem and Project-Based Learning (PBL) environment at Aalborg University (AAU), Denmark. As solving such a complex project, we emphasize that a high level of motivation is needed for the...

  18. Delay factors in failed construction projects in southwestern Nigeria ...

    African Journals Online (AJOL)

    This study was carried out with a view to showing the contribution of delay factors in the overall consideration of failed construction projects in south western Nigeria. This is considered necessary because the traditional view of construction project failure as consisting mainly of structural or functional failures tends to excuse ...

  19. Construction of hydroelectric project generation: Focuses of the option value

    International Nuclear Information System (INIS)

    Villegas P, Clara Ines

    2002-01-01

    Work present work aims at the development of an analysis, that using the option value approach allows finding the optimal moment (from the environmental point of view), for the construction of an electrical project generation in a zone with determined environmental characteristics. The construction of the project, constitutes an irreversible decision and with uncertainty associated. The evolution of the environmental damage of the zone can be attracting through the variable C of environmental damage. The analysis developed here allows the characterization of a rule (or a barrier of environmental damage called C, which determines when, is optimal to construct the generation project or to conserve the ecosystems of the zone of location. Over this barrier, the construction of the project becomes optimal and below her the conservation of the ecosystems of the zone is privileged

  20. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  1. The S-curve for forecasting waste generation in construction projects.

    Science.gov (United States)

    Lu, Weisheng; Peng, Yi; Chen, Xi; Skitmore, Martin; Zhang, Xiaoling

    2016-10-01

    Forecasting construction waste generation is the yardstick of any effort by policy-makers, researchers, practitioners and the like to manage construction and demolition (C&D) waste. This paper develops and tests an S-curve model to indicate accumulative waste generation as a project progresses. Using 37,148 disposal records generated from 138 building projects in Hong Kong in four consecutive years from January 2011 to June 2015, a wide range of potential S-curve models are examined, and as a result, the formula that best fits the historical data set is found. The S-curve model is then further linked to project characteristics using artificial neural networks (ANNs) so that it can be used to forecast waste generation in future construction projects. It was found that, among the S-curve models, cumulative logistic distribution is the best formula to fit the historical data. Meanwhile, contract sum, location, public-private nature, and duration can be used to forecast construction waste generation. The study provides contractors with not only an S-curve model to forecast overall waste generation before a project commences, but also with a detailed baseline to benchmark and manage waste during the course of construction. The major contribution of this paper is to the body of knowledge in the field of construction waste generation forecasting. By examining it with an S-curve model, the study elevates construction waste management to a level equivalent to project cost management where the model has already been readily accepted as a standard tool. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  3. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  4. Mapping of information and identification of construction waste at project life cycle

    Science.gov (United States)

    Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia

    2018-03-01

    The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.

  5. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  6. Impact of Construction Health & Safety Regulations on Project ...

    African Journals Online (AJOL)

    Impact of Construction Health & Safety Regulations on Project Parameters in Nigeria: Consultants and Contractors View. ... The study recommends that better attention is given to health and safety should as a project parameter and that related practice notes and guidelines should be evolved for all project stakeholders.

  7. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  8. Modelling of project cash flow on construction projects in Malang city

    Science.gov (United States)

    Djatmiko, Bambang

    2017-09-01

    Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.

  9. M.S. independent research study : partnering on small construction project

    OpenAIRE

    Conley, Michael A

    1997-01-01

    This investigation will address the possibility that partnering concepts are underutilized in small government projects. If Government Contracting Officers utilized partnering concepts on small construction projects, there could be a potential for saving millions of dollars annually. The primary objective of this report is to inform Contracting Officers of the benefits of partnering on small construction projects. Small projects will be considered to have a value of less than $3 million, mid-...

  10. Three Construction Projects with Wood Scraps

    Science.gov (United States)

    Levine, Elizabeth

    1977-01-01

    Wood, a natural material, appeals to children of all ages. Wood construction allows children the flexibility of moving parts of their work around until they are satisfied with the arrangement. Three projects are described. (Author/RK)

  11. A Systematic Approach to Modelling Change Processes in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available Modelling change processes within construction projects isessential to implement changes efficiently. Incomplete informationon the project variables at the early stages of projects leads toinadequate knowledge of future states and imprecision arisingfrom ambiguity in project parameters. This lack of knowledge isconsidered among the main source of changes in construction.Change identification and evaluation, in addition to predictingits impacts on project parameters, can help in minimising thedisruptive effects of changes. This paper presents a systematicapproach to modelling change process within construction projectsthat helps improve change identification and evaluation. Theapproach represents the key decisions required to implementchanges. The requirements of an effective change processare presented first. The variables defined for efficient changeassessment and diagnosis are then presented. Assessmentof construction changes requires an analysis for the projectcharacteristics that lead to change and also analysis of therelationship between the change causes and effects. The paperconcludes that, at the early stages of a project, projects with a highlikelihood of change occurrence should have a control mechanismover the project characteristics that have high influence on theproject. It also concludes, for the relationship between changecauses and effects, the multiple causes of change should bemodelled in a way to enable evaluating the change effects moreaccurately. The proposed approach is the framework for tacklingsuch conclusions and can be used for evaluating change casesdepending on the available information at the early stages ofconstruction projects.

  12. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  13. Introducing the VISAGE project - Visualization for Integrated Satellite, Airborne, and Ground-based data Exploration

    Science.gov (United States)

    Gatlin, P. N.; Conover, H.; Berendes, T.; Maskey, M.; Naeger, A. R.; Wingo, S. M.

    2017-12-01

    A key component of NASA's Earth observation system is its field experiments, for intensive observation of particular weather phenomena, or for ground validation of satellite observations. These experiments collect data from a wide variety of airborne and ground-based instruments, on different spatial and temporal scales, often in unique formats. The field data are often used with high volume satellite observations that have very different spatial and temporal coverage. The challenges inherent in working with such diverse datasets make it difficult for scientists to rapidly collect and analyze the data for physical process studies and validation of satellite algorithms. The newly-funded VISAGE project will address these issues by combining and extending nascent efforts to provide on-line data fusion, exploration, analysis and delivery capabilities. A key building block is the Field Campaign Explorer (FCX), which allows users to examine data collected during field campaigns and simplifies data acquisition for event-based research. VISAGE will extend FCX's capabilities beyond interactive visualization and exploration of coincident datasets, to provide interrogation of data values and basic analyses such as ratios and differences between data fields. The project will also incorporate new, higher level fused and aggregated analysis products from the System for Integrating Multi-platform data to Build the Atmospheric column (SIMBA), which combines satellite and ground-based observations into a common gridded atmospheric column data product; and the Validation Network (VN), which compiles a nationwide database of coincident ground- and satellite-based radar measurements of precipitation for larger scale scientific analysis. The VISAGE proof-of-concept will target "golden cases" from Global Precipitation Measurement Ground Validation campaigns. This presentation will introduce the VISAGE project, initial accomplishments and near term plans.

  14. Project and Production Management in the Construction Industry

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    In this issue, the Journal of Engineering, Project, and Production Management (EPPM-Journal) presents five original research papers related to project and production management in the construction industry from authors in Africa, Asia, and Europe.

  15. Evaluation model of project complexity for large-scale construction projects in Iran - A Fuzzy ANP approach

    Directory of Open Access Journals (Sweden)

    Aliyeh Kazemi

    2016-09-01

    Full Text Available Construction projects have always been complex. By growing trend of this complexity, implementations of large-scale constructions become harder. Hence, evaluating and understanding these complexities are critical. Correct evaluation of a project complication can provide executives and managers with good source to use. Fuzzy analytic network process (ANP is a logical and systematic approach toward defining, evaluation, and grading. This method allows for analyzing complex systems, and determining complexity of them. In this study, by taking advantage of fuzzy ANP, effective indexes for development of complications in large-scale construction projects in Iran have been determined and prioritized. The results show socio-political, project system interdependencies, and technological complexity indexes ranked top to three. Furthermore, in comparison of three main huge projects: commercial-administrative, hospital, and skyscrapers, the hospital project had been evaluated as the most complicated. This model is beneficial for professionals in managing large-scale projects.

  16. Assessment of global cloud datasets from satellites: Project and database initiated by the GEWEX radiation panel

    OpenAIRE

    Stubenrauch , C.J.; Rossow , W.B.; Kinne , S.; Ackerman , S.; Cesana , G.; Chepfer , H.; Di Girolamo , L.; Getzewich , B.; Guignard , A.; Heidinger , A.; Maddux , B.C.; Menzel , W.P.; Minnis , P.; Pearl , C.; Platnick , S.

    2013-01-01

    International audience; The Global Energy and Water Cycle Experiment (GEWEX) Radiation Panel initiated the GEWEX Cloud Assessment in 2005 to compare available, global, long-term cloud data products with the International Satellite Cloud Climatology Project (ISCCP). The GEWEX Cloud Assessment database included cloud properties retrieved from different satellite sensor measurements, taken at various local times and over various time periods. The relevant passive satellite sensors measured radia...

  17. The solar power satellite

    Energy Technology Data Exchange (ETDEWEB)

    Combes, P.F.

    1982-01-01

    The construction, launch, components, and operations of satellite solar power systems (SSPS) for direct beaming of solar energy converted to electricity to earth stations are outlined. The reference designs of either Si or concentrator GaAs solar cell assemblies large enough to project 5 GW of power are described. The beam will be furnished by klystrons or amplitrons for reception by rectennas on earth. Conforming to the law of amplitude and the equiphase law will permit high efficiencies, pointing accuracy, and low power deposition/sq cm, thus avoiding environmental problems, although some telecommunications systems may suffer interference. The construction of the dipole rectenna grid is sketched, noting that one receiver would be an ellipse sized at 10 x 13 km. Various forms of pollution which could result from the construction of an SSPS are examined.

  18. Alignment between ICT and communication in construction projects

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2004-01-01

    Through rapid advancements in ICT, opportunities arise in enhancing communication between participants of different organisations in construction projects. The use of ICT in construction is, however, relatively limited and ineffective compared to other sectors such as the automotive or the aerospace

  19. Reducing construction waste: A study of urban infrastructure projects.

    Science.gov (United States)

    de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu

    2017-09-01

    The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. Adoption and Use of Interorganizational ICT in a Construction Project

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    The objective of this research is to explain why actors are not using interorganizational information and communication technology (ICT) in construction projects in the intended way, by determining the mechanisms that influence the way actors use this ICT over time during a construction project.

  1. Qualitative Approach on Investigating Failure Factors of Yemeni Mega Construction Projects

    OpenAIRE

    Gamil Yaser; Abdul Rahman Ismail; Nagapan Sasitharan; Alemad Nashwan

    2017-01-01

    Large construction projects in Yemen face many impediments and challenges to be completed successfully. This article presents an investigative cases study of three mega construction projects which are considered failed to achieve their assigned plans and objectives. An exploratory interview was implied in this study via telephone to three construction experts who involved directly in these mega projects at the managerial level. Semi-structured questions based on literature were designed as gu...

  2. Causes of Low-Skilled Workers’ Performance in Construction Projects

    Directory of Open Access Journals (Sweden)

    Alhaji Ali Zannah

    2017-06-01

    Full Text Available Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achieved through a structured quantitative method of questionnaire distributed to 150 respondents that comprise of active stakeholders in the Nigerian construction industry. 111 responses representing 74 % were retrieved. The data were analysed using descriptive statistics and analysis of variance (ANOVA. The finding shows that; low wages of skilled, lack of sufficient skill acquisition centres and lack of incentive schemes for skilled workers were the most significant causes of low-skilled workers’ performance in the Nigerian construction industry. The homogenous analysis indicates that there are significant differences in perception of respondents on few variables whereas majority of respondents have similarities in most of the variables. The research findings indicate the need for stakeholders in the Nigerian construction industry to provide incentives and motivate skilled workers, provide training and retraining, conducive working condition, supply of quality materials and equipment, and proper site management in order improve low-skilled workers’ performance in Nigerian construction industry towards optimal performance.

  3. The Role of Demonstration Projects in Construction innovation processes

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry.......The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry....

  4. A study for EVMS application to NPP construction project

    Energy Technology Data Exchange (ETDEWEB)

    Roh, M. S.; Kwak, J. K. [KEPCO, Daejeon (Korea, Republic of)

    2016-05-15

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated.

  5. A study for EVMS application to NPP construction project

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.

    2016-01-01

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated

  6. Construction project of Flamanville 3 NPP. The participation of Iberdrola engineering and Construction

    International Nuclear Information System (INIS)

    Diaz Prada, J. I.; Cubian, B.

    2014-01-01

    Iberdrola Engineering and Construction (IIC) leads several projects mini EPC for the EPR Flamanville 3 NPP for providing important for safety components and auxiliary systems in the pump house and in the turbine island. The realization of this new nuclear project has been a challenge from the technical and organizational perspective because the plant is the first of the new nuclear station (FDAKE) type EPR 1700 MWe series in a highly restrictive environment due to to the large number of particular requirements from the final customer and the meager degree of progress of the design to the date of commencement of construction. (Author)

  7. Virtual Satellite Construction and Application for Image Classification

    International Nuclear Information System (INIS)

    Su, W G; Su, F Z; Zhou, C H

    2014-01-01

    Nowadays, most remote sensing image classification uses single satellite remote sensing data, so the number of bands and band spectral width is consistent. In addition, observed phenomenon such as land cover have the same spectral signature, which causes the classification accuracy to decrease as different data have unique characteristic. Therefore, this paper analyzes different optical remote sensing satellites, comparing the spectral differences and proposes the ideas and methods to build a virtual satellite. This article illustrates the research on the TM, HJ-1 and MODIS data. We obtained the virtual band X 0 through these satellites' bands combined it with the 4 bands of a TM image to build a virtual satellite with five bands. Based on this, we used these data for image classification. The experimental results showed that the virtual satellite classification results of building land and water information were superior to the HJ-1 and TM data respectively

  8. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  9. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  10. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  11. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  12. Development of a funding, cost, and spending model for satellite projects

    Science.gov (United States)

    Johnson, Jesse P.

    1989-01-01

    The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

  13. Incentive Model Based on Cooperative Relationship in Sustainable Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2017-07-01

    Full Text Available Considering the cooperative relationship between owners and contractors in sustainable construction projects, as well as the synergistic effects created by cooperative behaviors, a cooperative incentive model was developed using game theory. The model was formulated and analyzed under both non-moral hazard and moral hazard situations. Then, a numerical simulation and example were proposed to verify the conclusions derived from the model. The results showed that the synergistic effect increases the input intensity of one party’s resource transfer into the increase of marginal utility of the other party, thus the owner and contractor are willing to enhance their levels of effort. One party’s optimal benefit allocation coefficient is positively affected by its own output efficiency, and negatively affected by the other party’s output efficiency. The effort level and expected benefits of the owner and contractor can be improved by enhancing the cooperative relationship between the two parties, as well as enhancing the net benefits of a sustainable construction project. The synergistic effect cannot lower the negative effect of moral hazard behaviors during the implementation of sustainable construction projects. Conversely, the higher levels of the cooperative relationship, the wider the gaps amongst the optimal values under both non-moral hazard and moral hazard situations for the levels of effort, expected benefits and net project benefits. Since few studies to date have emphasized the effects of cooperative relationship on sustainable construction projects, this study constructed a game-based incentive model to bridge the gaps. This study contributes significant theoretical and practical insights into the management of cooperation amongst stakeholders, and into the enhancement of the overall benefits of sustainable construction projects.

  14. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  15. Interconnection of Broadband Islands via Satellite-Experiments on the Race II Catalyst Project

    National Research Council Canada - National Science Library

    Sun, Z

    1996-01-01

    .... The purpose of the project was to develop an ATM satellite link for the future B-ISDN services, particularly for the interconnections of the ATM testbeds which are in the form of broadband islands...

  16. Rural interdisciplinary mental health team building via satellite: a demonstration project.

    Science.gov (United States)

    Cornish, Peter A; Church, Elizabeth; Callanan, Terrence; Bethune, Cheri; Robbins, Carl; Miller, Robert

    2003-01-01

    This paper reports on the results of a demonstration project that examined the role of telehealth/telemedicine (hereafter referred to as telehealth) in providing interdisciplinary mental health training and support to health professionals in a rural region of Atlantic Canada. Special emphasis was placed on addressing the question of how training might affect interdisciplinary collaboration among the rural health professionals. Five urban mental health professionals from three disciplines provided training and support via video-satellite and internet, print and video resources to 34 rural health and community professionals. In order to assess the rural community's needs and the impact of the interventions, questionnaires were administered and on-site interviews were conducted before and after the project. Throughout the project, field notes were recorded and satisfaction ratings were obtained. Satisfaction with the video-satellite presentations was high and stable, with the exception of one session when signal quality was very poor. Rural participants were most satisfied with opportunities for interaction and least satisfied with the variable quality of the video transmission signal. High staff turnover among rural professionals resulted in insufficient power to permit statistical analysis. Positive reports of the project impact included expanded knowledge and heightened sensitivity to mental health issues, increased cross-disciplinary connections, and greater cohesion among professionals. The results suggest that, with some refinements, telehealth technology can be used to facilitate mental health training and promote interdisciplinary collaboration among professionals in a rural setting.

  17. Contracting Economics of Large Engineering and Construction Projects

    NARCIS (Netherlands)

    Berends, T.C.

    2007-01-01

    Large Engineering and Construction Projects (LECPs) form an important area of economic activity, covering a range of different artefacts. These projects have in common that they are massive undertakings, spanning long time periods and they involve large capital investments. Uncertainty and risk are

  18. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  19. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  20. A new framework for construction project definition stage

    DEFF Research Database (Denmark)

    Pikas, Ergo; Oehmen, Josef; Koskela, Lauri

    2018-01-01

    One major reason for the poor performance of construction project delivery is related to the 'ill'- performed project definition stage. The emphasis on rational decision-making and methods have stifled the creativity important to problem structuring and solution generation. Problem is in the poor...

  1. The influence of client brief and change order in construction project

    Science.gov (United States)

    Mahat, N. A. A.; Adnan, H.

    2018-02-01

    Construction briefing is a statement of needs about intentions and projects objectives. Briefing process is the preliminary stage in the design process and successful briefing can achieve project delivery right on target time, cost and quality of project confidently. Although there are many efforts to approach client’s requirement and needs for a project, it is still not collected adequately to make proper solutions in design. Thus, these may lead the client to include change orders during the construction phase. This paper is concerned toward the influence of client’s briefing of a construction project that impact on the change order on the construction works. The research objective is to identify the influence of client’s brief on change orders, therefore, the aims of the research is to reduce change orders in project delivery. This research adopted both qualitative and quantitative data collection methods which are content analysis and semi structure interview. The findings highlight factors contributing to change orders and the essential attributes of clients during the briefing stage that may help minimise them.

  2. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    Science.gov (United States)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  3. Architect Critical Challenges as a Project Manager in Construction Projects: A Case Study

    Directory of Open Access Journals (Sweden)

    Mohammadreza Yadollahi

    2014-01-01

    Full Text Available All construction professionals such as civil, mechanical, and electrical engineers, quantity surveyors, and architects have important roles in the construction process. Among these, architects are frequently appointed as a project manager (PM. The role of a PM will drive the success of the projects implementation. Therefore, the capability of an architect as a PM (ArPM is critical in reducing challenges encountered. Accordingly, the identification of these challenges is an important task in selecting an appropriate ArPM. The aim of this study is to identify the most critical challenges faced by an ArPM for construction projects. The data were collected through questionnaires and interviews with architects and professionals in the Malaysian construction industry. Because of the fuzziness and uncertainty of subjective responses, Fuzzy Set Ttheory is applied to identify critical challenges. A total of 65 questionnaires were distributed and 36 questionnaires were returned. The results revealed that the critical challenges faced by an ArPM are “poor planning,” “unfamiliar technology,” “unfamiliarity with green buildings and materials,” “inappropriate scheduling,” and “poor workmanship.” All critical challenges were then categorized into six main groups including technical, managerial, personal skills, contractual, psychological, and financial.

  4. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  5. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  6. Public private partnership construction project disputes in Nigeria ...

    African Journals Online (AJOL)

    This research examines the possibility of operating a smooth Public Private Partnership (PPP) project for the entire concession period following financial closure, without recourse to litigation or arbitration for settlement of disputes by studying the causes and effects of disputes in construction projects procured in Nigeria ...

  7. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  8. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    Science.gov (United States)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  9. DESIGN, CONSTRUCTION AND IMPLEMENTATION OF A 3 METER SATELLITE DISH ANTENNA (PARABOLOID REFLECTORS)

    OpenAIRE

    Danladi A; Jerome G

    2008-01-01

    The objective of this work is to design, construct and implement a 3m diameter paraboloid reflector with a frequency allocation of 3GHZ and above. The design was achieved with the help of wire mesh, aluminum span, mild steel, aluminum foil and glass fiber. The designed model was able to pick up signal from Arabian Satellite CNN, Adamawa Broadcasting television station and other channels with the help of low noise amplification block (LNB)

  10. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  11. Construction quality assurance program plan for the WIPP project, Carlsbad, NM

    International Nuclear Information System (INIS)

    1987-05-01

    The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization

  12. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study)

    OpenAIRE

    Hatem Khaleefah Al-Ageeli; Abdul Salam J. Ali Alzobaee

    2016-01-01

    The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A select...

  13. Decision problems in management of construction projects

    Science.gov (United States)

    Szafranko, E.

    2017-10-01

    In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.

  14. THE MODELLING OF ORGANIZATIONAL STRUCTURES OF MANAGEMENT BY REALIZING INVESTMENT CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Олег Александрович КУЧМА

    2016-03-01

    Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.

  15. A conceptual model of psychological contracts in construction projects

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2016-09-01

    Full Text Available The strategic importance of relationship style contracting is recognised in the construction industry. Both public and private sector clients are stipulating more integrated and collaborative forms of procurement. Despite relationship and integrated contractual arrangement being available for some time, it is clear that construction firms have been slow to adopt them. Hence it is timely to examine how social exchanges, via unwritten agreement and behaviours, are being nurtured in construction projects. This paper adopted the concept of Psychological Contracts (PC to describe unwritten agreement and behaviours. A conceptual model of the PC is developed and validated using the results from a questionnaire survey administered to construction professionals in Australia. The results uncovered the relationships that existed amongst relational conditions and relational benefits, the PC and the partners’ satisfaction. The results show that all the hypotheses in the conceptual model of the PC are supported, suggesting the PC model is important and may have an effect on project performance and relationship quality among contracting parties. A validated model of the PC in construction was then developed based on the correlations among each component. The managerial implications are that past relationships and relationship characteristics should be taken into account in the selection of procurement partners and the promise of future resources, support and tangible relational outcomes are also vital. It is important for contracting parties to pay attention to unwritten agreements (the PC and behaviours when managing construction projects.

  16. Delays in Building Construction Projects in Ghana

    Directory of Open Access Journals (Sweden)

    Adwoa B Agyakwah-Baah

    2010-07-01

    Full Text Available This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified from the literature and semi-structured interviews of 15 key players in the implementation process. These delay factors were further categorised into nine major groups. The list of delay causes was subjected to a questionnaire survey for the identification of the most important causes of delay. The field survey included 130 respondents made up of 39 contractors, 37 clients and 54 consultants. The relative importance of the individual causes and the groups were calculated and ranked by their relative importance index. The overall results of the study indicate that the respondents generally agree that financial group factors ranked highest among the major factors causing delay in construction projects in Ghana. The financial group factors were delay in honouring payment certificates, difficulty in accessing credit and fluctuation in prices. Materials group factors are second followed by scheduling and controlling factors.

  17. Optimizing strategy software for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of contractor’s view such as: proposed project duration with corresponding gross value and cash flows. This paper focuses on how to calculate tender data using Optimizing Strategy Software (OSS for repetitive construction projects with identical activity’s duration in case of single number of crew such as: project duration, project/bid price, project maximum working capital, and project net present value of the studied project. A simplified multi-objective optimization software (OSS will be presented that creates best tender data to contractor compared with more feasible options generated from multi-mode resources in a given project. OSS is intended to give more scenarios which provide practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price, and project maximum working capital while maximizing its net present value simultaneously. OSS is designed by java programing code system to provide a number of new and unique capabilities, including: (1 Ranking the obtained optimal plans according to a set of planner specified weights representing the relative importance of duration, price, maximum working capital and net present value in the analyzed project; (2 Visualizing and viewing the generated optimal trade-off; and (3 Providing seamless integration with available project management calculations. In order to provide the aforementioned capabilities of OSS, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; (4 A connecting module. At the end of the paper, an illustrative example will be presented to demonstrate and verify the applications of the proposed software (OSS to an optimization expressway of repetitive construction project.

  18. Management of investment-construction projects basing on the matrix of key events

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2016-11-01

    Full Text Available The article considers the current problematic issues in the management of investment-construction projects, examines the questions of efficiency increase of construction operations on the basis of the formation of a reflex-adaptive organizational structure. The authors analyzed the necessity of forming a matrix of key events in the investment-construction project (ICP, which will create the optimal structure of the project, basing on the work program for its implementation. For convenience of representing programs of the project implementation in time the authors make recommendations to consolidate the works into separate, economically independent functional blocks. It is proposed to use an algorithm of forming the matrix of an investment-construction project, considering the economic independence of the functional blocks and stages of the ICP implementation. The use of extended network model is justified, which is supplemented by organizational and structural constraints at different stages of the project, highlighting key events fundamentally influencing the further course of the ICP implementation.

  19. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    OpenAIRE

    Mohamed Marzouk; Mohamed El-zayat; Ahmed Aboushady

    2017-01-01

    Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG) footprint, eutrophication potential (EP), acidification potential (AP), human health (HH) particulate, ozone depletion, and smog. Each of these environmenta...

  20. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    Directory of Open Access Journals (Sweden)

    Özlem Tüz

    2013-12-01

    Full Text Available Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of the money. In this study, monitoring and measuring of the leverage ratio because of the displacement in cash inflows of construction projects which uses high leverage and low cash to do business in the sector is targeted. Cash need because of drifting the cash inflows may be seen due to the model. Work should be done in the early stages of the project with little capital but in the later stages, rapidly growing capital need arises.The values obtained from the model may be used to supply the capital held in the right time by anticipating the risks because of the delay in cashflow of construction projects which uses high leverage ratio.

  1. Constructive use of holographic projections

    International Nuclear Information System (INIS)

    Schroer, Bert

    2008-01-01

    Revisiting the old problem of existence of interacting models of QFT with new conceptual ideas and mathematical tools, one arrives at a novel view about the nature of QFT. The recent success of algebraic methods in establishing the existence of factorizing models suggests new directions for a more intrinsic constructive approach beyond Lagrangian quantization. Holographic projection simplifies certain properties of the bulk theory and hence is a promising new tool for these new attempts. (author)

  2. Constructive use of holographic projections

    Energy Technology Data Exchange (ETDEWEB)

    Schroer, Bert [Centro Brasileiro de Pesquisas Fisicas (CBPF), Rio de Janeiro, RJ (Brazil); Institut fuer Theoretische Physik der FU, Berlin (Germany)

    2008-07-01

    Revisiting the old problem of existence of interacting models of QFT with new conceptual ideas and mathematical tools, one arrives at a novel view about the nature of QFT. The recent success of algebraic methods in establishing the existence of factorizing models suggests new directions for a more intrinsic constructive approach beyond Lagrangian quantization. Holographic projection simplifies certain properties of the bulk theory and hence is a promising new tool for these new attempts. (author)

  3. The Satellite based Monitoring Initiative for Regional Air quality (SAMIRA): Project summary and first results

    Science.gov (United States)

    Schneider, Philipp; Stebel, Kerstin; Ajtai, Nicolae; Diamandi, Andrei; Horalek, Jan; Nemuc, Anca; Stachlewska, Iwona; Zehner, Claus

    2017-04-01

    We present a summary and some first results of a new ESA-funded project entitled Satellite based Monitoring Initiative for Regional Air quality (SAMIRA), which aims at improving regional and local air quality monitoring through synergetic use of data from present and upcoming satellite instruments, traditionally used in situ air quality monitoring networks and output from chemical transport models. Through collaborative efforts in four countries, namely Romania, Poland, the Czech Republic and Norway, all with existing air quality problems, SAMIRA intends to support the involved institutions and associated users in their national monitoring and reporting mandates as well as to generate novel research in this area. The primary goal of SAMIRA is to demonstrate the usefulness of existing and future satellite products of air quality for improving monitoring and mapping of air pollution at the regional scale. A total of six core activities are being carried out in order to achieve this goal: Firstly, the project is developing and optimizing algorithms for the retrieval of hourly aerosol optical depth (AOD) maps from the Spinning Enhanced Visible and InfraRed Imager (SEVIRI) onboard of Meteosat Second Generation. As a second activity, SAMIRA aims to derive particulate matter (PM2.5) estimates from AOD data by developing robust algorithms for AOD-to-PM conversion with the support from model- and Lidar data. In a third activity, we evaluate the added value of satellite products of atmospheric composition for operational European-scale air quality mapping using geostatistics and auxiliary datasets. The additional benefit of satellite-based monitoring over existing monitoring techniques (in situ, models) is tested by combining these datasets using geostatistical methods and demonstrated for nitrogen dioxide (NO2), sulphur dioxide (SO2), and aerosol optical depth/particulate matter. As a fourth activity, the project is developing novel algorithms for downscaling coarse

  4. Stakeholders Assessment of Constraints to Project Delivery in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Bruno L. Tanko

    2017-01-01

    Full Text Available The central goal of construction stakeholders is to successfully deliver projects to stated objective (s. However, for decades, construction projects have been plagued by perennial constraints of cost and time overruns, poor quality, and lack of sustainability. The objective of this paper is to identify and assess the constraints to construction project delivery, and to recommend solutions to enhance project performance. This paper adopted both quantitative and qualitative methods to establish the constraints in the Nigerian construction industry. A pilot survey and literature reviewed revealed a total of fifty (50 construction constraints, which were further classified into eight (8 major groups. Well-structured questionnaires were administered to construction stakeholders (client, consultant and contractor in Abuja, the federal capital city of Nigeria. Relative Importance Index (RII was used to analyze the data using Likert scale.  The results suggest that cost/time overrun related factors (inability to reduce project cost, Stakeholders interactive-related factors (inability to establish client value system, Client-related factors (Delay in interim payment and finance problem, and Labor/material-related factors (escalation of material prices and materials quality variability are the most prevalent constraints in the Nigerian construction environment.  To mitigate the effects of these challenges, it is suggested that a formal innovative approach should be used by stakeholders to address the problems of poor communication, high project cost, and delay. Clients should also take measures to provide adequate funding and should promptly honor interim certificates.

  5. Delivering construction projects using innovative building technologies

    CSIR Research Space (South Africa)

    Ampofo-Anti, Naalamkai

    2017-07-01

    Full Text Available . Figure 1: IBT delivery flowchart Proceedings 11th Built Environment Conference 6 th August – 8 th August 2017 Delivering construction projects using innovative building technologies Durban, South Africa 5. REFERENCES Ampofo-Anti, N...

  6. The impact of project management on nuclear construction lead times

    International Nuclear Information System (INIS)

    Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.

    1985-01-01

    A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill

  7. TRIP RATES FOR CONDOMINIUM CONSTRUCTION PROJECT

    Directory of Open Access Journals (Sweden)

    Wirach Hirun

    2015-01-01

    Full Text Available The number of large scale condominium construction projects had dramatically increased in Bangkok. Many projects had occurred in either densely populated areas or in central business districts, where traffic conditions were usually highly congested. To prevent traffic problems, a traffic impact study must be prepared and submitted for review by concerned public authorities. Unit trip generation rates were important data in traffic impact analysis. Without accurate unit trip generation rates, public agencies could not obtain accurate information on the traffic that will be generated. This study aimed to study trip rates and the factors affecting them for condominium construction project in Bangkok. The data were collected from 30 condominium construction sites located in 15 districts of Bangkok. The analysis used the linear regression method and was divided into three cases: 1 trip rates for all vehicles, 2 trip rates for classified vehicles, and 3 trip rates for all types of condominium. All case analyses considered weekdays, Saturday, and Sunday. The results found that trip rates related to the number of dwellings in the condominium. The trip rates for all vehicle types on weekdays, Saturday, and Sunday were 10.636, 4.647, and 9.294 vehicles per 100 dwelling units per day respectively. The trip rates for six-wheeled and ten-wheeled trucks on weekdays, Saturday, and Sunday were 2.046, 0.975, and 0.575 vehicles per 100 dwelling units per day respectively. The trip rate for four-wheeled trucks and passenger cars on weekdays was 1.960. Regarding condominium types, the trip rate for low rise condominiums for all vehicle types on weekdays was 5.315 while the trip rates for high rise condominiums for weekdays, Saturday, and Sunday were 3.965, 2.667, and 1.261 respectively.

  8. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  9. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self-Governance Tribes include IHS construction programs in a construction project agreement or in a funding...

  10. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  11. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  12. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  13. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  14. Model for setting priority construction project objectives aligned with ...

    African Journals Online (AJOL)

    participants, including contractors, quantity surveyors, project managers, architects, and ..... (2004: 1) report that the global construction industry is plagued with ..... 1.2. Construction consultant/Developer. 2. 1.2. Engineering. 2. 1.2. Logistics. 2. 1.2 ...... supplychain/PPPFA%20-%20media.pdf> [Accessed: 2 June 2011].

  15. Symbolic-Numerical Modeling of the Influence of Damping Moments on Satellite Dynamics

    Science.gov (United States)

    Gutnik, Sergey A.; Sarychev, Vasily A.

    2018-02-01

    The dynamics of a satellite on a circular orbit under the influence of gravitational and active damping torques, which are proportional to the projections of the angular velocity of the satellite, is investigated. Computer algebra Gröbner basis methods for the determination of all equilibrium orientations of the satellite in the orbital coordinate system with given damping torque and given principal central moments of inertia were used. The conditions of the equilibria existence depending on three damping parameters were obtained from the analysis of the real roots of the algebraic equations spanned by the constructed Gröbner basis. Conditions of asymptotic stability of the satellite equilibria and the transition decay processes of the spatial oscillations of the satellite at different damping parameters have also been obtained.

  16. Benefit Evaluation of Implementing BIM in Construction Projects

    Science.gov (United States)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  17. Project assessment for construction of new nuclear facility

    International Nuclear Information System (INIS)

    2013-01-01

    Project risk management is an important and integral part of project and quality management. It is also a key part of the due diligence process in making informed project decisions where in addition to the qualitative assessments quantitative ones shall be used to the extend practical. As part of the risk management process, risk identification, evaluation and mitigation must be an on-going activity at senior management levels throughout the planning, design, construction and commissioning phases of a new NPP

  18. The Influence of Trust on Project Management Practice within the Construction Industry

    OpenAIRE

    Strahorn, Scott; Brewer, Graham; Gajendran, Thayaparan

    2017-01-01

    Given that any construction project is inherently a human endeavour, it follows that issues of trust are significant in terms of the stakeholder interactions that deliver eventual project outcomes.  Previous research indicates that the relational basis upon which projects are undertaken are intended to influence the likelihood of trusting relationships between stakeholders.  Thus, experiences of trust in a construction project environment are likely to be influenced by the contextual specific...

  19. Applications and Prospects of Modularization Technology in HTR Project Starting from Primary Loop Cavity Construction

    International Nuclear Information System (INIS)

    Yang Guokang; Chen Jing; Huang Wen; Lin Lizhi; Sun Yunlun; Chen Yan; Mao Jiaxin; Wang Yougang; Wang Jinwen; Lin Mingfeng; Yang Mingshan

    2014-01-01

    Primary loop cavity is one of the key areas and major difficulties in HTR-PM project construction. In order to shorten the construction schedule and improve the construction quality, researches on modular design and construction of primary loop cavity has been carried out and the results have been applied in HTR-PM project construction, and got significant application benefit. This paper summarizes the modularization technology application research and project implementation results of primary loop cavity, and analyzes the application and prospects of modularization technology in the HTR project construction. (author)

  20. Collaborative Management of Complex Major Construction Projects: AnyLogic-Based Simulation Modelling

    Directory of Open Access Journals (Sweden)

    Na Zhao

    2016-01-01

    Full Text Available Complex supply chain system collaborative management of major construction projects effectively integrates the different participants in the construction project. This paper establishes a simulation model based on AnyLogic to reveal the collaborative elements in the complex supply chain management system and the modes of action as well as the transmission problems of the intent information. Thus it is promoting the participants to become an organism with coordinated development and coevolution. This study can help improve the efficiency and management of the complex system of major construction projects.

  1. Satellite Power Systems (SPS) concept definition study. Volume 5: Special emphasis studies. [rectenna and solar power satellite design studies

    Science.gov (United States)

    Hanley, G. M.

    1980-01-01

    Satellite configurations based on the Satellite Power System baseline requirements were analyzed and a preferred concept selected. A satellite construction base was defined, precursor operations incident to establishment of orbital support facilities identified, and the satellite construction sequence and procedures developed. Rectenna construction requirement were also addressed. Mass flow to orbit requirements were revised and traffic models established based on construction of 60 instead of 120 satellites. Analyses were conducted to determine satellite control, resources, manufacturing, and propellant requirements. The impact of the laser beam used for space-to-Earth power transmission upon the intervening atmosphere was examined as well as the inverse effect. The significant space environments and their effects on spacecraft components were investigated to define the design and operational limits imposed by the environments on an orbit transfer vehicle. The results show that LEO altitude 300 nmi and transfer orbit duration 6 months are preferrable.

  2. Dialing long distance : communications to northern operations like the MGP require sophisticated satellite networks for voice, data

    Energy Technology Data Exchange (ETDEWEB)

    Cook, D.

    2006-04-15

    Telecommunications will play a major role in the construction of the Mackenzie Gas Project due to the remoteness of its location and the volume of communication data required to support the number of people involved and the amount of construction activity. While suppliers for communications tools have not yet been identified, initial telecommunications plans call for the installation of communication equipment at all camps, major facility sites and construction locations. Equipment will be housed in self-contained, climate-controlled buildings called telecommunication service modules (TSMs), which will be connected to each other as well as to existing public communications networks. The infrastructure will support telephone and fax systems; Internet and electronic mail services; multiple channel very high frequency radios; air-to-ground communication at airstrips and helipads; ship-to-shore at barge landings; closed circuit television; satellite community antenna television; CBC radio broadcast; public address systems; security systems; and supervisory control and data acquisition (SCADA) systems. An Internet Protocol (IP) network with a voice telephone system will be implemented along with a geostationary orbit satellite network. Satellite servers and real-time data services will be used. Car kits that allow call and battery-operated self-contained telemetry devices designed to communicate via a satellite system have been commissioned for the project that are capable of providing cost-efficient and reliable asset tracking and fleet management in remote regions and assisting in deployment requirements. It was concluded that many of today's mega-projects are the driving factors behind new telecommunications solutions in remote areas. 1 fig.

  3. Relational approach in managing construction project safety: a social capital perspective.

    Science.gov (United States)

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  4. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  5. SAT-WIND project. Final report[Winds from satellites for offshore and coastal wind energy mapping and wind-indexing

    Energy Technology Data Exchange (ETDEWEB)

    Hasager, C.B.; Astrup, P.; Nielsen, M. (and others)

    2007-04-15

    The SAT-WIND project 'Winds from satellites for offshore and coastal wind energy mapping and wind-indexing' was a research project funded by STVF/DSF in the years 2003 to 2006 (Sagsnr. 2058-03-0006). The goal of the project was to verify the applicability of satellite wind maps derived from passive microwave, altimeter, scatterometer and imaging Synthetic Aperture Radar (SAR) technologies for wind energy tools for wind resources and wind-indexing. The study area was the Danish Seas including the North Sea, interior seas and the Baltic Sea. The report describes technical details on the satellite data sources including: 1) passive microwave (SSM/I, AMSR-E), 2) passive microwave polarimetric (WindSat), 3) scatterometer (ERS, QuikSCAT, Midori-2 and NSCAT), 4) altimeter (ERS, Topex, Poseidon, GFO-1, Jason-1), 5) SAR (ERS, Envisat). The SAR wind maps were treated in S-WAsP developed by Risoe National Laboratory in cooperation with GRAS A/S in the innovative project SAT-WIND-SMV (Sagsnr. 2104-05-0084) in the years 2005 and 2006 in parallel with SAT-WIND. The results from the SAT-WIND project are presented. These include ocean wind statistics, offshore wind resource estimates and comparison results for wind-indexing. (au)

  6. SAT-WIND project. Final report[Winds from satellites for offshore and coastal wind energy mapping and wind-indexing

    Energy Technology Data Exchange (ETDEWEB)

    Hasager, C B; Astrup, P; Nielsen, M [and others

    2007-04-15

    The SAT-WIND project 'Winds from satellites for offshore and coastal wind energy mapping and wind-indexing' was a research project funded by STVF/DSF in the years 2003 to 2006 (Sagsnr. 2058-03-0006). The goal of the project was to verify the applicability of satellite wind maps derived from passive microwave, altimeter, scatterometer and imaging Synthetic Aperture Radar (SAR) technologies for wind energy tools for wind resources and wind-indexing. The study area was the Danish Seas including the North Sea, interior seas and the Baltic Sea. The report describes technical details on the satellite data sources including: 1) passive microwave (SSM/I, AMSR-E), 2) passive microwave polarimetric (WindSat), 3) scatterometer (ERS, QuikSCAT, Midori-2 and NSCAT), 4) altimeter (ERS, Topex, Poseidon, GFO-1, Jason-1), 5) SAR (ERS, Envisat). The SAR wind maps were treated in S-WAsP developed by Risoe National Laboratory in cooperation with GRAS A/S in the innovative project SAT-WIND-SMV (Sagsnr. 2104-05-0084) in the years 2005 and 2006 in parallel with SAT-WIND. The results from the SAT-WIND project are presented. These include ocean wind statistics, offshore wind resource estimates and comparison results for wind-indexing. (au)

  7. Determining Success Criteria and Success Factors for International Construction Projects for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    Ali Mohammed Alashwal

    2017-06-01

    Full Text Available The success of international construction projects is fraught with various challenges such as competitiveness, lack of resources, versatile global economy, and specific conditions in the host country. Malaysian contractors have been venturing into global construction market since early 1980s. However, their venturing was not successful all the time. The number of international projects awarded to Malaysian contractors has reduced drastically during the past decade. Taking advantage of this experience, this paper aims to identify the success criteria and success factors of international construction projects. The data was collected from 120 respondents using a questionnaire survey and analysed using principal component analysis and regression analysis. The results revealed three principal criteria of project success namely, Management Success, Functional Success, and Organisation Success. The main components of success factors include Team Power and Skills, Resource Availability, External Environment, Organisation Capability, Project Support, and Project Organisation. Further analysis emphasized the importance of strong financing capacity of contractors, project social environment, and competence of the project manager in achieving project success. The results of this paper can serve as a guideline for contractors and project managers to achieve success in this context. Future studies may provide in-depth analysis of success criteria and success factors specific for construction project type and host-country location.

  8. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  9. Communication, coordination and cooperation in construction projects: business environment and human behaviours

    Science.gov (United States)

    Salah Alaloul, Wesam; Shahir Liew, Mohd; Zawawi, Noor Amila Wan

    2017-12-01

    The accomplishment of construction projects is extremely dependent on the integration of several stakeholders; therefore none of them has the control or the ability to accomplish the project alone. Each of them may influence and be influenced by the project management approach. There is no comprehensive theoretical platform for defining Communication, Coordination and Cooperation (3Cs) in the management of construction project. This paper deliberates the function of the 3Cs different theoretical perceptions. Through an analysis of selected articles from reputable academic journals in construction management, the business environment and human behaviour were identified as two main parts. A little has been done so far about the 3Cs, and how they are correlated with construction projects performance. Therefore, the objective of this paper is to explain the definitions and the association between the 3Cs. There is a significant link between communication and coordination. Coordination alternatively, is trust-based a logic of mutual and exchange. Consequently, cooperation is much more sophisticated, which needing more time and attempts.

  10. Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints

    Directory of Open Access Journals (Sweden)

    Nurbasirah Mohamed Alias

    2013-09-01

    Full Text Available It should be pointed out that the dilemma of interruption and stoppage in the construction industry is a large-scale trend. Construction interruption and stoppage is considered one of the most recurring problems in the construction industry. Construction Interruption and stoppage is always measured as costly to all parties concerned in the projects and very often it will result in clash, claims, total desertion and much difficult for the feasibility and it slows the growth of construction sector. The objective of the research work that underpins this paper was to investigate the Factors and Consequences of construction projects on local contractors. A construction project is commonly acknowledged as successful when the aim of the project is achieved in terms of predetermined objectives that are mainly completed the project on time, within budget and specified quality in accordance with the specifications and to stakeholders’ satisfaction. One of the most important problems that may arise in the construction project is delays and the magnitude of these delays varies considerably from project to project. According to delay categories that were contractor related, client related, consultant related, labour related and external related, the study revealed the six major effects of delay that were time overrun, cost overrun, dispute, arbitration, total abandonment, and litigation.

  11. Identification of risk factors affecting construction of projects: The case of emerging economy

    Directory of Open Access Journals (Sweden)

    Chipo Mellania Maseko

    2017-12-01

    Full Text Available Controlling project risks has become a daunting task in construction and this can be attributed to issues such as the nature of modern projects. The challenge is that risk appears unannounced at any project phase for various reasons and thereby affecting the performance and the success of unprepared projects. The current studies that explored risk matters include Pehlivan and Öztemir (2015, Katre, and Ghaitidak (2016 amongst others. However, there is absence of unanimity from these studies on risk factors in construction. Thus, this article was instigated in order to identify and classify risk factors that affect the chances of project success. The research methodology selected for this article comprised of peer-reviewed articles between the periods of 2007 to 2017. This approach involved a comprehensive scrutiny into scholarly articles to comprehend risks in construction projects. Following a conceptual analysis, eighty factors were identified and classified under the following; technical, construction, financial, socio-political, physical, organisational, and environmental and other risks. From these categories, political instability was, found to be the most influential risk factor in construction projects and this factor was classified within the socio-political category and this category has total of 11 factors. Finding suggests the need for further empirical study.

  12. On Student Motivation in a Problem and Project-Based Satellite Development and Learning Environment

    DEFF Research Database (Denmark)

    Larsen, Jesper Abildgaard; Nielsen, Jens Frederik Dalsgaard; Zhou, Chunfang

    2013-01-01

    During the past decade, students at Aalborg University have had the possibility to participate in the cross disciplinary, and cross semester project of building and launching a cubesat. However, as such a project easily can last from three to five years, from the initial development to the launch...... of the satellite, it is important to consider how to keep the different student groups, who have participated in the project motivated in further developing of their respective subsystems, as well as engage actively in knowledge transfer to new student groups....

  13. INFORMATION MODELING OF LIFE CYCLE OF HIGH-RISE CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2018-02-01

    Full Text Available To date, many years’ experience in the construction and operation of high-rise buildings has been accumulated. Its analysis reveals not only the engineering and organizational-technological specifics of such projects, but also systemic gaps in the field of management. In the implementation of large-scale and unique projects for high-rise buildings, the problems and tasks of improving approaches to managing the full life cycle of projects and methods, which will improve their competitiveness, become topical. The systems being used have largely exhausted their resource efficiency, which is associated with automation of traditional “inherited” processes and management structures, as well as development of IT-systems focused on digitalization of the activities of construction company, rather than the project. To solve these problems, it is proposed to carry out: reengineering of the schemes of information interaction between the project’s participants; formation of integrated digital environment for the life cycle of the project; development of systems for integrating data management and project management. Subject: problems, approaches and methods of digitalization of project’s life cycle management in relation to the specifics and features of high-rise buildings. Research objectives: substantiation of the most perspective approaches and methods of information modeling of high-rise construction as the basis for managing the full life cycle of the given project. Materials and methods: the experience of digitalization of design, construction, operation and development of high-rise buildings, presented in specialized literature, is analyzed. The methods for integrating information models of various stages of project’s life cycle and for information interaction of project’s participants are considered. Results: the concept of forming a single digital environment for the project is proposed, taking into account the features of the life

  14. Evaluating construction projects of hotels based on environmental sustainability with MCDM framework

    Directory of Open Access Journals (Sweden)

    Sarfaraz Hashemkhani Zolfani

    2018-03-01

    Full Text Available Environmental issues have got incredible attention among daily life activities. Sustainability penetrated in all society practices specially construction industry due to its substantial impact on the environment. Monitoring and controlling architectural project contains a decision problem with multi-varieties analysis. This study aimed to evaluate construction projects of hotels regarding environmental sustainability. To this end, a hybrid Multiple Criteria Decision Making (MCDM model is proposed. Step‐wise Weight Assessment Ratio Analysis (SWARA and Complex proportional assessment (COPRAS compose a unified framework. A private construction project is supposed as a case study. The project is based on establishing a five star hotel in Tehran, Iran. In this research SWARA produces criteria weights and COPRAS will rank decision alternatives. This study can be a strategic route for other similar researches in other fields. Keywords: Architecture projects, Sustainability, Environmental sustainability, SWARA, COPRAS

  15. Design iteration in construction projects – Review and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  16. SatelliteDL: a Toolkit for Analysis of Heterogeneous Satellite Datasets

    Science.gov (United States)

    Galloy, M. D.; Fillmore, D.

    2014-12-01

    SatelliteDL is an IDL toolkit for the analysis of satellite Earth observations from a diverse set of platforms and sensors. The core function of the toolkit is the spatial and temporal alignment of satellite swath and geostationary data. The design features an abstraction layer that allows for easy inclusion of new datasets in a modular way. Our overarching objective is to create utilities that automate the mundane aspects of satellite data analysis, are extensible and maintainable, and do not place limitations on the analysis itself. IDL has a powerful suite of statistical and visualization tools that can be used in conjunction with SatelliteDL. Toward this end we have constructed SatelliteDL to include (1) HTML and LaTeX API document generation,(2) a unit test framework,(3) automatic message and error logs,(4) HTML and LaTeX plot and table generation, and(5) several real world examples with bundled datasets available for download. For ease of use, datasets, variables and optional workflows may be specified in a flexible format configuration file. Configuration statements may specify, for example, a region and date range, and the creation of images, plots and statistical summary tables for a long list of variables. SatelliteDL enforces data provenance; all data should be traceable and reproducible. The output NetCDF file metadata holds a complete history of the original datasets and their transformations, and a method exists to reconstruct a configuration file from this information. Release 0.1.0 distributes with ingest methods for GOES, MODIS, VIIRS and CERES radiance data (L1) as well as select 2D atmosphere products (L2) such as aerosol and cloud (MODIS and VIIRS) and radiant flux (CERES). Future releases will provide ingest methods for ocean and land surface products, gridded and time averaged datasets (L3 Daily, Monthly and Yearly), and support for 3D products such as temperature and water vapor profiles. Emphasis will be on NPP Sensor, Environmental and

  17. MEASURING THE PERFORMANCE OF GUYANA’S CONSTRUCTION INDUSTRY USING A SET OF PROJECT PERFORMANCE BENCHMARKING METRICS

    Directory of Open Access Journals (Sweden)

    Christopher J. Willis

    2011-10-01

    Full Text Available A study measuring the performance of Guyana’s construction industry using a set of project performance benchmarking metrics was recently completed. The underlying premise of the study was that the aggregated performance of construction projects provides a realistic assessment of the performance of the construction industry, on the basis that construction projects are the mechanism through which the construction industry creates its tangible products. The fact that an influential government agency acted as owner of the study was critical to the data collection phase. The best approach for collecting project performance data in Guyana involves the utilisation of a researcher or team of researchers mining electronic and hard copy project documents. This study analysed approximately 270 construction projects to obtain an indication of the performance of guyana’s construction industry. It was found that sea defence projects performed the worst, whereas health facility projects performed the best. The main implication of this is that sea defence projects are likely to be the least efficient and, given their critical nature, there is an argument for urgent performance improvement interventions.

  18. Risk assessment framework on time impact: Infrastructure projects in soft soil during construction stage

    Science.gov (United States)

    Low, W. W.; Wong, K. S.; Lee, J. L.

    2018-04-01

    With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.

  19. Attribute Hierarchy of Conflicts in Construction Projects: A Case Study of Sindh

    Directory of Open Access Journals (Sweden)

    Shabbir Hussain Khahro

    2015-10-01

    Full Text Available Conflicts seem to arise throughout the life cycle of the construction project and in result, these may lead to several other issues such as project cost overrun, time overrun, productivity loss, loss of profit and above all damage of business relationships in general and specifically in construction industry. Hence, this paper focuses on various direct and indirect causes leading to conflicts in construction industry of Sindh, Pakistan. Detailed literature review and interviews have been carried out to identify several direct and indirect causes of conflicts and finally, a set of questionnaire has been designed and distributed to get expert opinion on the significance of these causes in this sector. The data has been analyzed by RIW (Relative Importance Weight method. The outcome of this study shows that payment delay is the major direct cause of conflicts in the construction projects followed by contractual claims, public interruption, poor communication and site conditions. Thus, it is suggested that proper attention should be given to the above mentioned concerns so as to have a uniform flow of construction project life cycle without any interruption.

  20. AUTOMATED CONSTRUCTION OF COVERAGE CATALOGUES OF ASTER SATELLITE IMAGE FOR URBAN AREAS OF THE WORLD

    Directory of Open Access Journals (Sweden)

    H. Miyazaki

    2012-07-01

    Full Text Available We developed an algorithm to determine a combination of satellite images according to observation extent and image quality. The algorithm was for testing necessity for completing coverage of the search extent. The tests excluded unnecessary images with low quality and preserve necessary images with good quality. The search conditions of the satellite images could be extended, indicating the catalogue could be constructed with specified periods required for time series analysis. We applied the method to a database of metadata of ASTER satellite images archived in GEO Grid of National Institute of Advanced Industrial Science and Technology (AIST, Japan. As indexes of populated places with geographical coordinates, we used a database of 3372 populated place of more than 0.1 million populations retrieved from GRUMP Settlement Points, a global gazetteer of cities, which has geographical names of populated places associated with geographical coordinates and population data. From the coordinates of populated places, 3372 extents were generated with radiuses of 30 km, a half of swath of ASTER satellite images. By merging extents overlapping each other, they were assembled into 2214 extents. As a result, we acquired combinations of good quality for 1244 extents, those of low quality for 96 extents, incomplete combinations for 611 extents. Further improvements would be expected by introducing pixel-based cloud assessment and pixel value correction over seasonal variations.

  1. Identifying the most critical project complexity factors using Delphi method: the Iranian construction industry

    Directory of Open Access Journals (Sweden)

    Mohammad Mehdi Mozaffari

    2012-09-01

    Full Text Available Complexity is one of the most important issues influencing success of any construction project and there are literally different studies devoted to detect important factors increasing complexity of projects. During the past few years, there have been growing interests in developing mass construction projects in Iran. The proposed study of this paper uses Delphi technique to find out about important factors as barriers of construction projects in Iran. The results show that among 47 project complexity factors, 19 factors are more important than others are. The study groups different factors into seven categories including environmental, organizational, objectives, tasks, stakeholders, technological, information systems and determines the relative importance of each. In each group, many other sub group activities are determined and they are carefully investigated. The study provides some detailed suggestions on each category to reduce the complexity of construction project.

  2. Modeling Manpower and Equipment Productivity in Tall Building Construction Projects

    Science.gov (United States)

    Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya

    2017-12-01

    Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.

  3. JET Project: progress in construction and management

    International Nuclear Information System (INIS)

    Bertolini, E.

    1978-01-01

    The JET Project of the European Community aims to construct and operate one of the largest Tokamak Devices foreseen at present in the field of Fusion Research. The aim of the experiment is to produce and study plasma conditions approaching those needed in a thermonuclear reactor and therefore will involve operation with deuterium--tritium gas

  4. 42 CFR 137.329 - What environmental considerations must be included in the construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...

  5. Small Explorer project: Submillimeter Wave Astronomy Satellite (SWAS). Mission operations and data analysis plan

    Science.gov (United States)

    Melnick, Gary J.

    1990-01-01

    The Mission Operations and Data Analysis Plan is presented for the Submillimeter Wave Astronomy Satellite (SWAS) Project. It defines organizational responsibilities, discusses target selection and navigation, specifies instrument command and data requirements, defines data reduction and analysis hardware and software requirements, and discusses mission operations center staffing requirements.

  6. Estimating Required Contingency Funds for Construction Projects using Multiple Linear Regression

    National Research Council Canada - National Science Library

    Cook, Jason J

    2006-01-01

    Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund...

  7. Satellite tracking of threatened species

    Science.gov (United States)

    Williams, M.; Lunsford, A.; Ellis, D.; Robinson, J.; Coronado, P.; Campbell, W.

    1998-01-01

    In 1990, a joint effort of two U.S. federal agencies, NASA Goddard Space Flight Center (GSFC) and the Patuxent Wildlife Research Center, began. We initially joined forces in a project that used satellite telemetry to discover the winter home of a tiny dwindling population of Siberian Cranes. Since then several projects have emerged, and a web site was created to follow some of these activities. This web site is called the Satellite Tracking of Threatened Species and its location is http://sdcd.gsfc.nasa.gov/ISTO/satellite_tracking. It describes the overall program, and links you to three subsections that describe the projects in more detail: Satellite Direct Readout, Birdtracks, and Birdworld.

  8. ARM Radiosondes for National Polar-Orbiting Operational Environmental Satellite System Preparatory Project Validation Field Campaign Report

    Energy Technology Data Exchange (ETDEWEB)

    Borg, Lori [Univ. of Wisconsin, Madison, WI (United States); Tobin, David [Univ. of Wisconsin, Madison, WI (United States); Reale, Anthony [National Oceanic and Atmospheric Administration (NOAA), Washington, DC (United States); Knuteson, Robert [Univ. of Wisconsin, Madison, WI (United States); Feltz, Michelle [Univ. of Wisconsin, Madison, WI (United States); Liu, Mark [National Oceanic and Atmospheric Administration (NOAA), Washington, DC (United States); Holdridge, Donna J [Argonne National Lab. (ANL), Argonne, IL (United States); Mather, James [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-06-01

    This IOP has been a coordinated effort involving the U.S. Department of Energy (DOE) Atmospheric Radiation (ARM) Climate Research Facility, the University of Wisconsin (UW)-Madison, and the JPSS project to validate SNPP NOAA Unique Combined Atmospheric Processing System (NUCAPS) temperature and moisture sounding products from the Cross-track Infrared Sounder (CrIS) and the Advanced Technology Microwave Sounder (ATMS). In this arrangement, funding for radiosondes was provided by the JPSS project to ARM. These radiosondes were launched coincident with the SNPP satellite overpasses (OP) at four of the ARM field sites beginning in July 2012 and running through September 2017. Combined with other ARM data, an assessment of the radiosonde data quality was performed and post-processing corrections applied producing an ARM site Best Estimate (BE) product. The SNPP targeted radiosondes were integrated into the NOAA Products Validation System (NPROVS+) system, which collocated the radiosondes with satellite products (NOAA, National Aeronautics and Space Administration [NASA], European Organisation for the Exploitation of Meteorological Satellites [EUMETSAT], Geostationary Operational Environmental Satellite [GOES], Constellation Observing System for Meteorology, Ionosphere, and Climate [COSMIC]) and Numerical Weather Prediction (NWP forecasts for use in product assessment and algorithm development. This work was a fundamental, integral, and cost-effective part of the SNPP validation effort and provided critical accuracy assessments of the SNPP temperature and water vapor soundings.

  9. Distributing Resources in a Construction Project

    DEFF Research Database (Denmark)

    Axel, Erik

    2015-01-01

    In the present paper the status of theories are discussed. It will be based on the fact that our understanding comes out of our common activity, and we will take point of departure in some empirical material from a construction project. We shall explore a conception of conflictual cooperation, wh...... that accordingly theories must change with the process, that they are dissolving in praxis. Keywords: arrangement, common cause, concept, conflictual cooperation, contradictions, design of square, praxis, procedure, resources, theory....

  10. The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects

    Science.gov (United States)

    Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa

    2018-03-01

    The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.

  11. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  12. Project Culture in the Chinese Construction Industry: Perceptions of Contractors

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available In recent years culture has become one of the most studied topicsin project management research. Some studies have investigatedthe infl uence of culture at different levels – such as nationalculture, industry culture, organisational culture and professionalculture. As a project-based industry, the construction industryneeds to have more insight concerning cultural issues at theproject level and their infl uence on the performance of constructionprojects. Few studies, however, have focused on culture at theproject level. This paper uses a questionnaire survey to determinethe perceptions of Chinese contractors about the impact of projectculture on the performance of local construction projects. This isaugmented by a series of in-depth interviews with senior executivemanagers in the industry. The fi ndings indicate that specifi c projectculture does contribute signifi cantly towards project outcomes.In particular, goal orientation and fl exibility, as two dimensionsof project culture, have a negative statistical correlation withperceived satisfaction of the process, commercial success, futurebusiness opportunities, lessons learnt from the project, satisfactionwith the relationships, and overall performance. This paper alsoindicates that the affordability of developing an appropriate projectculture is a major concern for industry practitioners.

  13. 42 CFR 137.353 - What is contained in a construction project financial report?

    Science.gov (United States)

    2010-10-01

    ... financial report? 137.353 Section 137.353 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... § 137.353 What is contained in a construction project financial report? Construction project financial reports contain information regarding the amount of funds expended during the reporting period, and...

  14. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  15. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  16. Construction Project Success ranking through the Data Envelopment Analysis

    Directory of Open Access Journals (Sweden)

    Mazyar Zahedi-Seresht

    2014-09-01

    Full Text Available The purpose of this paper is to rank construction projects' success in a post delivery phase. To attain this objective, a data envelopment analysis (DEA approach is used. The model's output is a project success index which is calculated based on five project success criteria. These criteria which are determined by a two-round Delphi questionnaire survey are time performance, cost performance, quality, HSE, and customer satisfaction. The input factors which have effects on the output measures are Organizational Sponsorship, Project Manager Competency, Customer Organization, Project Operational Environment and Organizational Experience. The tool adopted to determine these factors is questionnaire. This model is applied for 9 projects with different importance of output and input factors and the reasonable result is achieved for ranking these projects.

  17. causes of conflicts in construction projects in nigeria

    African Journals Online (AJOL)

    user

    NIGERIA. 2 DEPARTMENT OF ARCHITECTURE AND CIVIL ENGINEERING, CITY ... Thus, this study was aimed at identifying and assessing causes of conflicts in Nigeria .... technical specification, government intervention, ..... scale construction projects: A case study,” Constr. ... study of Bygga Villa, a Swedish triple helix e-.

  18. Effectiveness of Quality Management System (QMS) on Construction Projects

    OpenAIRE

    Behnam Neyestani

    2016-01-01

    Quality management system (QMS) provides generic guidance and requirements for establishing an appropriate quality management procedure, in order to lower cost, increase productivity, customer's satisfaction, and market share in the organizations since the last two-decade. In construction industry, it can assist the companies to achieve successfully their objectives, and ensure that all phases of construction project consistently meet client's requirements (need). The main aim of this article...

  19. Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2013-06-01

    Full Text Available The construction sector is one of the key economic sectors and is the main force motivating the Palestinian national economy. However, it suffers from number of problems that affect time, cost and quality performances. This study aims at identifying the common risks affecting time overrun in road construction projects in the West Bank in Palestine from contractors’ viewpoint. 45 factors that might cause delays of road construction projects were defined through a detailed literature review. A questionnaire survey was performed to rank the considered factors in terms of severity and frequency. The analysis of the survey indicated that the top risks affecting time overrun in road construction projects in Palestine are: financial status of the contractors, payments delay by the owner, political situation, segmentation of the West Bank, poor communication between construction parties, lack of equipment efficiency, and high competition in bids.

  20. Challenges of the expansive use of Building Information Modeling (BIM in construction projects

    Directory of Open Access Journals (Sweden)

    Hannele Kerosuo

    2015-06-01

    Full Text Available Building information modeling (BIM is an emerging modeling technology which challenges existing work procedures and practices in the construction industry. In this article we study the challenges, problems and potential expansions of BIM as a tool in the design, construction and operation of buildings. For this purpose the interfaces between different parties are examined in Finnish construction projects. The methodological approach of the study is cultural-historical activity theory, according to which a new artifact becomes a mediating instrument when the participatory subjects reconfigure the entire activity. The implementation of BIM is now spreading from the design activity to other phases of the construction projects, but its use is still limited in the projects' other three interfaces. BIM is an evolving set of software developed for various purposes which is locally 'combined' to fit the circumstances and capabilities of the stakeholders of the construction process.

  1. Spacecraft design project: Low Earth orbit communications satellite

    Science.gov (United States)

    Moroney, Dave; Lashbrook, Dave; Mckibben, Barry; Gardener, Nigel; Rivers, Thane; Nottingham, Greg; Golden, Bill; Barfield, Bill; Bruening, Joe; Wood, Dave

    1991-01-01

    This is the final product of the spacecraft design project completed to fulfill the academic requirements of the Spacecraft Design and Integration 2 course (AE-4871) taught at the U.S. Naval Postgraduate School. The Spacecraft Design and Integration 2 course is intended to provide students detailed design experience in selection and design of both satellite system and subsystem components, and their location and integration into a final spacecraft configuration. The design team pursued a design to support a Low Earth Orbiting (LEO) communications system (GLOBALSTAR) currently under development by the Loral Cellular Systems Corporation. Each of the 14 team members was assigned both primary and secondary duties in program management or system design. Hardware selection, spacecraft component design, analysis, and integration were accomplished within the constraints imposed by the 11 week academic schedule and the available design facilities.

  2. Benefits of Building Information Modelling in the Project Lifecycle: Construction Projects in Asia

    Directory of Open Access Journals (Sweden)

    Jian Li

    2014-08-01

    Full Text Available Building Information Modelling (BIM is a process involving the creation and management of objective data with property, unique identity and relationship. In the Architecture, Engineering and Construction (AEC industry, BIM is adopted a lot in the lifecycle of buildings because of the high integration of information that it enables. Four-dimensional (4D computer-aided design (CAD has been adopted for many years to improve the construction planning process. BIM is adopted throughout buildings' lifecycles, in design, construction and operation. This paper presents five large-scale public and financial projects that adopt BIM in the design, construction and operational phases. Different uses of BIM are compared and contrasted in the context of the separate backgrounds. It is concluded that productivity is improved where BIM is used to enable easy sharing and integration of information and convenient collaboration.

  3. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    Science.gov (United States)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  4. Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2009-01-01

    If client values are not fully understood in a construction project it is likely to result in either low fulfilment of client expectations or multiple design alterations during the project process which lead to additional costs and frustration among the project participants. However...... by the fact that the delivery team, which is responsible for understanding and delivering client value, is made up of even more different parties. The paper reports the initial outcome of a joint research project between academics and practitioners, which aims to develop a practical workshop model...... that incorporates client values into the conceptual design of construction projects. The workshop model draws on value management and lean thinking as underlying principles in an attempt to address the ambiguous concept of ‘value’....

  5. Rural Residents’ Perception of Construction Project Delays in Pakistan

    Directory of Open Access Journals (Sweden)

    Shahid Hussain

    2017-11-01

    Full Text Available The construction industry is one of the key sectors that facilitate sustainable economic and social development in the region. Currently, community development mechanisms are adopted by many developed and developing nations, aimed at enhancing economic growth and quality of life along with social welfare of the local community. This study reviews the rural residents’ perception of public construction project delays and aims to explore economic and social challenges confronted by residents, especially in rural areas in Pakistan. A questionnaire with 26 factors identified from the literature was sent to rural educated residents. Through a questionnaire survey, the opinions of rural residents were sought and tested. Based on 366 (73% valid responses, this study examined the socio-economic influencing factors. The findings of the study revealed that problems faced while traveling, increase the price of consumer goods, high transportation costs, lack of educational opportunities, more expenditures on education, and barriers to primary healthcare access were the top most important factors. Research results confirmed that the delays in construction projects negatively affect the socio-economic conditions of the rural community, which directly influence the rural dwells’ sustainable life. The research findings suggest that the practitioners in public sector organization make sure to execute the project on time and within the quality. Otherwise, it has negative socio-economic implications for the rural community.

  6. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  7. A Multi-Objective Trade-Off Model in Sustainable Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2017-10-01

    Full Text Available Based on the consideration of the relative importance of sustainability-related objectives and the inherent nature of sustainable construction projects, this study proposes that the contractor can balance the levels of efforts and resources used to improve the overall project sustainability. A multi-objective trade-off model using game theory was established and verified through simulation and numerical example under a moral hazard situation. Results indicate that effort levels of the contractor on sustainability-related objectives are positively related to the outcome coefficient while negatively to the coefficients of effort cost of the relevant objectives. High levels of the relative importance of sustainability-related objectives contribute to high levels of effort of the contractor. With the variation in effort levels and the coefficient of benefit allocation, the project net benefit increases before declining. The function of project benefit has a marked peak value, with an inverted “U” shape. An equilibrium always exists as for the given relative importance and coefficients of the effort costs of sustainability-related objectives. Under this condition, the owner may offer the contractor a less intense incentive and motivate the contractor reasonably arranging input resources. The coefficient of benefit allocation is affected by the contractor characteristic factors and the project characteristic factors. The owner should balance these two types of factors and select the most appropriate incentive mechanism to improve the project benefit. Meanwhile, the contractor can balance the relative importance of the objectives and arrange the appropriate levels of effort and resources to achieve a sustainability-related objective. Very few studies have emphasized the effects of the relative importance of sustainability-related objectives on the benefits of sustainable construction projects. This study therefore builds a multi-objective trade

  8. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    Directory of Open Access Journals (Sweden)

    Beliakov Sergei

    2018-01-01

    Full Text Available Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  9. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    Science.gov (United States)

    Beliakov, Sergei

    2018-03-01

    Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  10. An Agent Based Approach for Project Management in Construction

    OpenAIRE

    Sencer, Safiye; Turgay, Tahsin

    2013-01-01

    Project management has an important role in terms of time, cost and flexibility. An agentbased architecture provides additional robustness, scalability, flexibility that is particularly appropriate for problems with a dynamic and distributed nature. Integrated agent based project management covers design and construction planning. It is combined with plan execution, tolerating both the design and plan, which may be changed as necessary. In this reason, the decision making process requires tha...

  11. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Ageeli

    2016-03-01

    Full Text Available The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twelve critical success factors, the most important factors of it were ("contractor financial efficiency ", " security ,political , economic stability ", "the project manager competence" and " Integration and clarity of contract documents " , thirteen critical failure factors, the most important factors of it were ("corruption " , " external circumstances ", "Financial difficulties of owner", and ten success criteria , the most important criteria of it were ("within allocated budget" , " within time period" , "Quality" .

  12. Satellite medical centers project

    Science.gov (United States)

    Aggarwal, Arvind

    2002-08-01

    World class health care for common man at low affordable cost: anywhere, anytime The project envisages to set up a national network of satellite Medical centers. Each SMC would be manned by doctors, nurses and technicians, six doctors, six nurses, six technicians would be required to provide 24 hour cover, each SMC would operate 24 hours x 7 days. It would be equipped with the Digital telemedicine devices for capturing clinical patient information and investigations in the form of voice, images and data and create an audiovisual text file - a virtual Digital patient. Through the broad band connectivity the virtual patient can be sent to the central hub, manned by specialists, specialists from several specialists sitting together can view the virtual patient and provide a specialized opinion, they can see the virtual patient, see the examination on line through video conference or even PCs, talk to the patient and the doctor at the SMC and controlle capturing of information during examination and investigations of the patient at the SMC - thus creating a virtual Digital consultant at the SMC. Central hub shall be connected to the doctors and consultants in remote locations or tertiary care hospitals any where in the world, thus creating a virtual hub the hierarchical system shall provide upgradation of knowledge to thedoctors in central hub and smc and thus continued medical education and benefit the patient thru the world class treatment in the smc located at his door step. SMC shall be set up by franchisee who shall get safe business opportunity with high returns, patients shall get Low cost user friendly worldclass health care anywhere anytime, Doctors can get better meaningful selfemplyment with better earnings, flexibility of working time and place. SMC shall provide a wide variety of services from primary care to world class Global consultation for difficult patients.

  13. Project management practice and its effects on project success in Malaysian construction industry

    Science.gov (United States)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  14. NASA/DARPA advanced communications technology satellite project for evaluation of telemedicine outreach using next-generation communications satellite technology: Mayo Foundation participation.

    Science.gov (United States)

    Gilbert, B K; Mitchell, M P; Bengali, A R; Khandheria, B K

    1999-08-01

    To describe the development of telemedicine capabilities-application of remote consultation and diagnostic techniques-and to evaluate the feasibility and practicality of such clinical outreach to rural and underserved communities with limited telecommunications infrastructures. In 1992, Mayo Foundation (Rochester, Minn, Jacksonville, Fla, and Scottsdale, Ariz), the National Aeronautics and Space Administration, and the Defense Advanced Research Projects Agency collaborated to create a complex network of fiberoptic landlines, video recording systems, satellite terminals, and specially developed data translators linking Mayo sites with other locations in the continental United States on an on-demand basis. The purpose was to transmit data via the asynchronous transfer mode (ATM) digital communications protocol over the Advanced Communications Technology Satellite. The links were intended to provide a conduit for transmission of data for patient-specific consultations between physicians, evaluation of medical imagery, and medical education for clinical staffs at remote sites. Low-data-rate (LDR) experiments went live late in 1993. Mayo Clinic Rochester successfully provided medical consultation and services to 2 small regional medical facilities. High-data-rate (HDR) experiments included studies of remote digital echocardiography, store-and-forward telemedicine, cardiac catheterization, and teleconsultation for congenital heart disease. These studies combined landline data transmission with use of the satellite. The complexity of the routing paths and network components, immaturity of available software, and inexperience with existing telecommunications caused significant study delays. These experiments demonstrated that next-generation satellite technology can provide batch and real-time imagery for telemedicine. The first-generation of the ATM and satellite network technology used in these experiments created several technical problems and inconveniences that should

  15. Construction safety monitoring based on the project's characteristic with fuzzy logic approach

    Science.gov (United States)

    Winanda, Lila Ayu Ratna; Adi, Trijoko Wahyu; Anwar, Nadjadji; Wahyuni, Febriana Santi

    2017-11-01

    Construction workers accident is the highest number compared with other industries and falls are the main cause of fatal and serious injuries in high rise projects. Generally, construction workers accidents are caused by unsafe act and unsafe condition that can occur separately or together, thus a safety monitoring system based on influencing factors is needed to achieve zero accident in construction industry. The dynamic characteristic in construction causes high mobility for workers while doing the task, so it requires a continuously monitoring system to detect unsafe condition and to protect workers from potential hazards. In accordance with the unique nature of project, fuzzy logic approach is one of the appropriate methods for workers safety monitoring on site. In this study, the focus of discussion is based on the characteristic of construction projects in analyzing "potential hazard" and the "protection planning" to be used in accident prevention. The data have been collected from literature review, expert opinion and institution of safety and health. This data used to determine hazard identification. Then, an application model is created using Delphi programming. The process in fuzzy is divided into fuzzification, inference and defuzzification, according to the data collection. Then, the input and final output data are given back to the expert for assessment as a validation of application model. The result of the study showed that the potential hazard of construction workers accident could be analysed based on characteristic of project and protection system on site and fuzzy logic approach can be used for construction workers accident analysis. Based on case study and the feedback assessment from expert, it showed that the application model can be used as one of the safety monitoring tools.

  16. Assessing construction project performance in Ghana : modelling practitioners' and clients perspectives

    NARCIS (Netherlands)

    Gyadu-Asiedu, W.

    2009-01-01

    Several countries at various levels of socio-economic development have recognised the need and importance of taking measures to improve the performance of their construction industry. One of the means to this end has been to ensure performance efficiency in construction project execution. As has

  17. Defining collaborative elements in an effective and efficient collaboration in a construction project

    DEFF Research Database (Denmark)

    Bohnstedt, Kristian Ditlev; Wandahl, Søren

    2018-01-01

    Professional organizations, companies, educational and research institutions of the construction industry and the government have been driving initiatives and participated in the debate on the future of the construction industry. The state has participated in the construction industry development...... through experimental construction projects and debates and, on this basis, demanded and released guidelines for public and publicly funded construction projects. In the quest of defining collaborative elements, previous efforts have been reviewed, thus, identifying most successful initiatives and the used...... collaborative elements. These elements will be included in a study where they will go through a verification process. The themes derived from a contraction of the identified aspects in collaboration through the past two decades in the Danish construction industry were examined to conclude on which of the themes...

  18. Quantitative Decision Making Model for Carbon Reduction in Road Construction Projects Using Green Technologies

    Directory of Open Access Journals (Sweden)

    Woosik Jang

    2015-08-01

    Full Text Available Numerous countries have established policies for reducing greenhouse gas emissions and have suggested goals pertaining to these reductions. To reach the target reduction amounts, studies on the reduction of carbon emissions have been conducted with regard to all stages and processes in construction projects. According to a study on carbon emissions, the carbon emissions generated during the construction stage of road projects account for approximately 76 to 86% of the total carbon emissions, far exceeding the other stages, such as maintenance or demolition. Therefore, this study aims to develop a quantitative decision making model that supports the application of green technologies (GTs to reduce carbon emissions during the construction stage of road construction projects. First, the authors selected environmental soundness, economic feasibility and constructability as the key assessment indices for evaluating 20 GTs. Second, a fuzzy set/qualitative comparative analysis (FS/QCA was used to establish an objective decision-making model for the assessment of both the quantitative and qualitative characteristics of the key indices. To support the developed model, an expert survey was performed to assess the applicability of each GT from a practical perspective, which was verified with a case study using two additional GTs. The proposed model is expected to support practitioners in the application of suitable GTs to road projects and reduce carbon emissions, resulting in better decision making during road construction projects.

  19. The Evolution of Successful Satellite Science to Air Quality Application Projects: From Inception to Realization

    Science.gov (United States)

    Soja, A. J.

    2012-12-01

    Teams of scientist have been working for almost a decade with state, local, regional and federal Air Quality regulators and scientists on several projects that have been focused on improving biomass burning emissions within our nation's National Emissions Inventory (NEI). Initially, the NEI was based strictly on ground-based information that often used data aggregated from previous years reported at the county-centroid and completely ignored the spatial domain of all fires. This methodology resulted in gross inaccuracies; however it was an ingrained system and the users and organizations were largely comfortable. Improvements were viewed as too costly. Our task was to convince regulators, managers and users of the value that could be added by using satellite data to enhance the NEI. Certainly, there were individuals that understood the value of using satellite data, but they needed support to convince the establishment of the intrinsic, cost-effective value of publically-available satellite data. It was essential to present arguments, as well as requested verification and validation statistics, in the format that most suited the objectives of application organizations. This process incorporated: knowledge of state-of-the-art satellite data, algorithms and science; a working knowledge of the users applications and requirements; interacting with individuals with a variety of skill sets and goals; and perhaps most importantly, listening to the goals and responsibilities of the user community and fully communicating. Today, the Environmental Protection Agency and several state and regional organizations are using satellite data to estimate biomass burnings emissions at daily and annual scales for a number of critical environmental management and policy activities including regulation setting and regional strategy development for attainment of the National Ambient Air Quality Standards (NAAQS). We continue to work at the local, state and federal levels to improve the

  20. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  1. Monitoring Snow and Land Ice Using Satellite data in the GMES Project CryoLand

    Science.gov (United States)

    Bippus, Gabriele; Nagler, Thomas

    2013-04-01

    The main objectives of the project "CryoLand - GMES Service Snow and Land Ice" are to develop, implement and validate services for snow, glaciers and lake and river ice products as a Downstream Service within the Global Monitoring for Environment and Security (GMES) program of the European Commission. CryoLand exploits Earth Observation data from current optical and microwave sensors and of the upcoming GMES Sentinel satellite family. The project prepares also the basis for the cryospheric component of the GMES Land Monitoring services. The CryoLand project team consists of 10 partner organisations from Austria, Finland, Norway, Sweden, Switzerland and Romania and is funded by the 7th Framework Program of the European Commission. The CryoLand baseline products for snow include fractional snow extent from optical satellite data, the extent of melting snow from SAR data, and coarse resolution snow water equivalent maps from passive microwave data. Experimental products include maps of snow surface wetness and temperature. The products range from large scale coverage at medium resolution to regional products with high resolution, in order to address a wide user community. Medium resolution optical data (e.g. MODIS, in the near future Sentinel-3) and SAR (ENVISAT ASAR, in the near future Sentinel-1) are the main sources of EO data for generating large scale products in near real time. For generation of regional products high resolution satellite data are used. Glacier products are based on high resolution optical (e.g. SPOT-5, in the near future Sentinel-2) and SAR (TerraSAR-X, in the near future Sentinel-1) data and include glacier outlines, mapping of glacier facies, glacier lakes and ice velocity. The glacier products are generated on users demand. Current test areas are located in the Alps, Norway, Greenland and the Himalayan Mountains. The lake and river ice products include ice extent and its temporal changes and snow extent on ice. The algorithms for these

  2. Data processing project management in the construction of plants and power stations

    International Nuclear Information System (INIS)

    Huelsen, H.; Hayen, W.

    1987-01-01

    The requirements of project management in plant construction i.e. basic data, supervision and control became more and more detailed. These requirements can only satisfactorily be met with the help of data processing. Piping design requires up to 50% of the whole amount of engineering in design and management of plant construction. We present data processing project management system which explains the connections of single aspects. Its connections consists of: collection of basic data, plant design and installation, supervision of planning and installation, planning and calculation, collection, use, administration and approval of plan data, procurement material, construction of the model (1:25), and installation. (orig.) [de

  3. Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

    Energy Technology Data Exchange (ETDEWEB)

    Albin, Kenneth A.; Bachand, Marie T.; Biebesheimer, Fred H.; Neshem, Dean O.; Smoot, John L. [CH2M HILL Plateau Remediation Company, Richland, Washington 99352 (United States)

    2012-07-01

    CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using

  4. Telelibrary: Library Services via Satellite.

    Science.gov (United States)

    Liu, Rosa

    1979-01-01

    Investigates the provision of library services via satellite, explains briefly the operation and advantages of communication satellites, and discusses the various telecommunications equipment and services which, when coupled with satellite transmission, will enhance library activities. Demand trend projections for telecommunications services…

  5. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Science.gov (United States)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  6. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Directory of Open Access Journals (Sweden)

    Burmistrov Andrey

    2018-01-01

    Full Text Available The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  7. A Decision Model Assessing the Owner and Contractor’s Conflict Behaviors in Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2018-01-01

    Full Text Available Considering the effects of the contractor’s conflict behaviors on the project benefit, a decision model between the owner and contractor’s conflict behaviors in construction projects was constructed using the principal-agent theory and game theory. The model was analyzed under nonconflicting and conflicting conditions, and a numerical simulation and example analysis were proposed to verify the constructed model’s conclusion. The results showed that the effort levels of the owner and contractor not only relate to benefit-sharing coefficient and effort outcome coefficient but also depend on the contractor’s ability of converting the conflict into benefit and the loss caused by conflict behaviors. A higher ability of converting conflicts into benefits and lower levels of the loss caused by conflict behaviors for the contractor lead to lower levels of the net benefit of the owner, conversely higher levels of the net benefit of the contractor. Balancing the contractor’s ability of converting conflicts into benefits and the loss caused by conflict behaviors lead to a more reasonable risk allocation between the owner and contractor, improving the effort level and net benefit. To add value to the construction project, the owner should establish an impartial and reasonable benefit-sharing mechanism, optimize the owner and contractor’s resource arrangement, maximize the positive effect of conflict on project benefits, and avoid the negative effect of conflict. Few studies to date have investigated the effects of conflict behaviors on project benefits in terms of modeling and simulation in construction projects. As such, this study bridges this gap and contributes significant theoretical and practical insights about managing conflict behaviors in an interorganizational context, thus enhancing performance in construction projects.

  8. Survey and analysis of satellite-based telemedicine projects involving Japan and developing nations: investigation of transmission rates, channel numbers, and node numbers.

    Science.gov (United States)

    Nakajima, I; Natori, M; Takizawa, M; Kaihara, S

    2001-01-01

    We surveyed interactive telemedicine projects via telecommunications satellite (AMINE-PARTNERS, Post-PARTNERS, and Shinshu University Project using Inmarsat satellites) offered by Japan as assistance to developing countries. The survey helped clarify channel occupation time and data transfer rates. Using our survey results, we proposed an optimized satellite model with VSATs simulating the number of required channels and bandwidth magnitude. For future implementation of VSATs for medical use in developing nations, design of telecommunication channels should take into consideration TCP/IP-based operations. We calculated that one hub station with 30-76 VSATs in developing nation can be operated on bandwidth 6 Mbps using with 128 Kbps videoconferencing system for teleconsultation and teleconference, and linking with Internet.

  9. Facilitating Value Creation and Delivery in Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Bonke, Sten

    This thesis is about value creation in the early stages of construction design processes. It has been problem-driven with a specific management concept, the workshop model, as an outset. Essentially the question was; how should construction project design processes be managed with the objective...... awareness about the potential ‘pit-falls’ observed in the case-studies by means of three metaphors for reflection and design-group adjustment. These are: (1) Part-whole conversation, (2) Game of persuasion and (3) Hyper-reality. Reflection and adjustment may require the inclusion of a facilitator....... In addition, concrete suggestions for further development of the design management concept, the workshop model, are provided. In general, the thesis contributes to the emerging literature on construction design man-agement, which is still in its infancy. In addition, the theory part of the thesis contrib...

  10. Evaluating aggregate terrestrial impacts of road construction projects for advanced regional mitigation.

    Science.gov (United States)

    Thorne, James H; Girvetz, Evan H; McCoy, Michael C

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  11. Evaluating Aggregate Terrestrial Impacts of Road Construction Projects for Advanced Regional Mitigation

    Science.gov (United States)

    Thorne, James H.; Girvetz, Evan H.; McCoy, Michael C.

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  12. BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

    Directory of Open Access Journals (Sweden)

    Venkrbec Vaclav

    2017-12-01

    Full Text Available Building information modeling (BIM can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.

  13. BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

    Science.gov (United States)

    Venkrbec, Vaclav; Bittnerova, Lucie

    2017-12-01

    Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.

  14. Project-Based Learning and Student Knowledge Construction during Asynchronous Online Discussion

    Science.gov (United States)

    Koh, Joyce Hwee Ling; Herring, Susan C.; Hew, Khe Foon

    2010-01-01

    Project-based learning engages students in problem solving through artefact design. However, previous studies of online project-based learning have focused primarily on the dynamics of online collaboration; students' knowledge construction throughout this process has not been examined thoroughly. This case study analyzed the relationship between…

  15. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    Science.gov (United States)

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  16. 41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?

    Science.gov (United States)

    2010-07-01

    ... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...

  17. The International Satellite Cloud Climatology Project H-Series climate data record product

    Science.gov (United States)

    Young, Alisa H.; Knapp, Kenneth R.; Inamdar, Anand; Hankins, William; Rossow, William B.

    2018-03-01

    This paper describes the new global long-term International Satellite Cloud Climatology Project (ISCCP) H-series climate data record (CDR). The H-series data contain a suite of level 2 and 3 products for monitoring the distribution and variation of cloud and surface properties to better understand the effects of clouds on climate, the radiation budget, and the global hydrologic cycle. This product is currently available for public use and is derived from both geostationary and polar-orbiting satellite imaging radiometers with common visible and infrared (IR) channels. The H-series data currently span July 1983 to December 2009 with plans for continued production to extend the record to the present with regular updates. The H-series data are the longest combined geostationary and polar orbiter satellite-based CDR of cloud properties. Access to the data is provided in network common data form (netCDF) and archived by NOAA's National Centers for Environmental Information (NCEI) under the satellite Climate Data Record Program (https://doi.org/10.7289/V5QZ281S" target="_blank">https://doi.org/10.7289/V5QZ281S). The basic characteristics, history, and evolution of the dataset are presented herein with particular emphasis on and discussion of product changes between the H-series and the widely used predecessor D-series product which also spans from July 1983 through December 2009. Key refinements included in the ISCCP H-series CDR are based on improved quality control measures, modified ancillary inputs, higher spatial resolution input and output products, calibration refinements, and updated documentation and metadata to bring the H-series product into compliance with existing standards for climate data records.

  18. A status report on the PBFA II construction project

    International Nuclear Information System (INIS)

    Barr, G.W.; Furaus, J.P.; Cook, D.L.; Shirley, C.G.

    1985-01-01

    The Particle Beam Fusion Accelerator II (PBFA II) is under construction at Sandia National Laboratories (SNL). PBFA II contains 36 individual power modules configured in a stacked radial geometry and synchronized to provide greater than 3.5 MJ of energy into the vacuum section in a single 55-ns-wide 90-TW peak power pulse. This R and D construction project is being implemented in a fast track schedule mode in which final design of the accelerator components occurs in parallel with the construction of the laboratory building and the accelerator tank. PBFA II is scheduled to become operational in January 1986 with its first multi-module shot into an applied-B ion diode that will generate and transport a beam of lithium ions. Plans are now being made for experimental work on PBFA II beyond the construction phase

  19. Identification of shareholder ethics and responsibilities in online reverse auctions for construction projects.

    Science.gov (United States)

    Hatipkarasulu, Yilmaz; Gill, James H

    2004-04-01

    The increasing number of companies providing internet services and auction tools helped popularize the online reverse auction trend for purchasing commodities and services in the last decade. As a result, a number of owners, both public and private, accepted the online reverse auctions as the bidding technique for their construction projects. Owners, while trying to minimize their costs for construction projects, are also required to address their ethical responsibilities to the shareholders. In the case of online reverse auctions for construction projects, the ethical issues involved in the bidding technique directly reflects on the owner's ethical and social responsibilities to their shareholders. The goal of this paper is to identify the shareholder ethics and responsibilities in online reverse auctions for construction projects by analyzing the ethical issues for the parties involved in the process. The identification of the ethical issues and responsibilities requires clear definition and understanding of professional ethics and the roles of the involved parties. In this paper, first, the concept of professional ethics and social responsibility is described in a general form. To illustrate the ethical issues and responsibilities, a sample case of bidding for a construction project using online reverse auction techniques is presented in which the shareholders were actively involved in questioning the ethical issues. The issues involved in the bidding process and their reflection on the shareholder responsibilities are described and analyzed for each stage of the process. A brief discussion of the overall process is also included to address the general ethical issues involved in online reverse auctions.

  20. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  1. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  2. A Lean Framework for Production Control in Complex and Constrained Construction Projects (PC4P)

    DEFF Research Database (Denmark)

    Lindhard, Søren Munch; Wandahl, Søren

    2014-01-01

    Production conditions in construction are different than in themanufacturing industry. First of all, construction is rooted in place and conducted as on-site manufacturing. Secondly, every construction project is unique and a one-of-a-kind production, managed by a temporary organization consisting...... and constrained construction project. Even though several tools have attempted to add structure and to create order, to the complex, dynamic, and uncertain context in which constructions is conducted, none has yet fully succeeded in providing a robust production control system. With outset in the lean tool Last...

  3. Information richness in construction projects: A critical social theory

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Greenwood, David

    2002-01-01

    Two important factors influencing the communication in construction projects are the interests of the people involved and the language spoken by the people involved. The objective of the paper is to analyse these factors by using recent insights in the information richness theory. The critical

  4. Performance-based procurement for low disturbance brdige construction projects

    NARCIS (Netherlands)

    Sebastian, R.; Claeson-Jonsson, C.; Di Giulio, R.

    2013-01-01

    Purpose – This paper aims to introduce a method of performance-based procurement, based on the most economically advantageous tender (MEAT), for low-disturbance bridge construction projects in urban environment. Design/methodology/approach – The first part of this paper reviews the key performance

  5. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    Science.gov (United States)

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  6. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    Science.gov (United States)

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  7. Construction projects using alternative materials: a framework to assess their sustainability.

    OpenAIRE

    Fevre-Gautier , Anne-Lise; Beylot , Antoine; Vaxelaire , Stéphane; Michel , Pascale; Brullot , Sabrina; Lannou , Grégory; Stoos , Marion

    2012-01-01

    The increasing use of alternative materials and local solutions for construction projects raises questions about success conditions and criteria for the economic feasibility and global sustainability of such projects. Among others, how can design conditions - especially regarding the decision process - determine their success? We will present the results of a two-years project conducted from February 2010 to March 2012 in collaboration with ADEME (French agency of environment and energy contr...

  8. An Improved dem Construction Method for Mudflats Based on BJ-1 Small Satellite Images: a Case Study on Bohai Bay

    Science.gov (United States)

    Wu, D.; Du, Y.; Su, F.; Huang, W.; Zhang, L.

    2018-04-01

    The topographic measurement of muddy tidal flat is restricted by the difficulty of access to the complex, wide-range and dynamic tidal conditions. Then the waterline detection method (WDM) has the potential to investigate the morph-dynamics quantitatively by utilizing large archives of satellite images. The study explores the potential for using WDM with BJ-1 small satellite images to construct a digital elevation model (DEM) of a wide and grading mudflat. Three major conclusions of the study are as follows: (1) A new intelligent correlating model of waterline detection considering different tidal stages and local geographic conditions was explored. With this correlative algorithm waterline detection model, a series of waterlines were extracted from multi-temporal remotely sensing images collected over the period of a year. The model proved to detect waterlines more efficiently and exactly. (2) The spatial structure of elevation superimposing on the points of waterlines was firstly constructed and a more accurate hydrodynamic ocean tide grid model was used. By the newly constructed abnormal hydrology evaluation model, a more reasonable and reliable set of waterline points was acquired to construct a smoother TIN and GRID DEM. (3) DEM maps of Bohai Bay, with a spatial resolution of about 30 m and height accuracy of about 0.35 m considering LiDAR and 0.19 m considering RTK surveying were constructed over an area of about 266 km2. Results show that remote sensing research in extremely turbid estuaries and tidal areas is possible and is an effective tool for monitoring the tidal flats.

  9. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  10. Alternate performance standard project: Interpreting the post-construction test

    International Nuclear Information System (INIS)

    Williamson, A.D.; McDonough, S.E.

    1993-01-01

    The paper describes the results of a project commissioned by the State of Florida, in cooperation with the US Environmental Protection Agency, as one portion of the Florida Radon Research Program (FRRP). The purpose of the FRRP is to provide technical support for a statewide Building Standard for Radon-Resistant Construction currently in the rulemaking process. In this case the information provides technical background for a post-construction radon test specified as a performance element of the code which accompanies the prescriptive alternative that does not incorporate active radon reduction systems

  11. Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model

    Science.gov (United States)

    Zhao, Erdong; Li, Shangqi

    2017-08-01

    As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.

  12. The Hydraulic Project Włocławek: Design, Studies, Construction and Operation

    Directory of Open Access Journals (Sweden)

    Wojciech Majewski

    2015-03-01

    Full Text Available The Hydraulic Project Włocławek was commissioned in 1970 as the first barrage of the Lower Vistula Cascade (LVC. The purpose of the LVC was to create an important source of hydro-energy and inland navigation route connecting central Poland with the port city of Gdańsk. Along the Lower Vistula (LV important cities and industrial centres are located. The Włocławek project still remains the only barrage on the LV thus creating a number of problems. The paper presents the basic hydrological and hydraulic data for the Vistula river, and describes the Włocławek project, hydraulic model investigations conducted in the design phase, the construction of the project and the main problems, attendant on its use, including the winter flood of 1982 in the upper part of the Włocławek reservoir. The paper ends with conclusions on project construction and exploitation. The next barrage downstream from Włocławek is proposed.

  13. TECHNICAL AND ECONOMIC SUBSTANTIATION OF PROJECTS OF THE AFFORDABLE HOUSING CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    KRAVCHUNOVSKA T. S.

    2015-12-01

    Full Text Available Summary. Problem statement. The development of inhabitant locality of Ukraine is characterized by significant differences in levels of socio and economic development. An excessive concentration of population and industry in large cities, inefficient, slow development of most medium and small cities, towns and villages, considerable territorial disproportions of economic development of the country, considerable shortcomings in the territorial organization of society are observed. At the same time the tendency of the total area of increasing of inhabitant locality. The lands are used inefficiently. Among the most common problems of inhabitant locality is the housing problem. When making a decision on the design of affordable housing construction is one of the most important stages in the development of the technique and economic substantiation of the project is determination of the advisability and effectiveness of construction. The substantiation of advisability and effectiveness of affordable housing based on the definition of technical and economic indicators of projects, one of the most important among them is the cost, in its calculation is necessary to take into account the influence of organizational and technological factors, reflecting the features of construction in condition of compacted construction. Purpose. Development of methodical recommendations on substantiation of cost construction of affordable housing in the conditions of compacted construction. Conclusion. To provide a processing and the analysis of data is necessary development of the applied software on the basis of the developed block scheme of justification of cost construction of affordable housing.

  14. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  15. Prioritization of proposed waste management construction projects for the Waste Management program within the Department of Energy

    International Nuclear Information System (INIS)

    Johnson, J.V.

    1995-01-01

    A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy

  16. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  17. Critical management practices influencing on-site waste minimization in construction projects.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. Radiation environmental impact assessment of radioactive substances of an airport transit storage construction projects

    International Nuclear Information System (INIS)

    Zhang Baozeng; Xia Zitong; Zou Zhaozhuang

    2014-01-01

    Radioactive substances belong to dangerous goods transport aviation. Radioactive substances impoundments construction purpose is to ensure that the radioactive material during transport to transport and the public to achieve full or isolation, the effects of radiation on the human body, property and the environment caused by the control to an acceptable level. According to the relevant national standards and norms, for radiation protection evaluation of project construction of an airport radioactive impoundments, feasibility of the construction project radiation environment. (authors)

  19. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  20. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  1. A Proactive Approach for Change Management and Control on Construction Projects

    OpenAIRE

    CHEN, CHAO

    2015-01-01

    Changes on construction projects present tough and controversial issues. Change is one of the primary reasons for schedule delay and cost overrun, which create negative impact on project performance and profitability. The liability of change and its consequences are major sources of disagreements between project participants, which often lead to disputes or claims.To answer the challenge of change, both industry and academia have developed change management techniques. Many studies have touch...

  2. A selective study of Information technologies to improve operations efficiency in construction

    Directory of Open Access Journals (Sweden)

    Konikov Alexandr

    2018-01-01

    Full Text Available Today, information technologies (IT are used in almost every production industry. While the aspects of IT are well studied and discussed in relevant monographs, articles, web sources, etc., this paper reviews the performance improvement options in the construction industry by leveraging IT. From a wide range of information technologies the author has picked the most relevant solutions, from his point of view, based on several considerations, the most important one being the lack of adequate attention to these technologies specifically in the construction industry. The paper covers the following technologies: Big Data (a smart technology for high-speed processing of huge and diverse data arrays; situation centers (SC for construction and operations projects (SCs are successfully used in other industries for operating control of sophisticated facilities; data warehouses (DW for the construction industry (DWs are viewed as a standalone project rather than a supplement to Data Mining or Big Data; operational and dispatch radio communication service (radio communication can ensure instant connectivity between several subscribers; VSAT (a satellite technology for prompt connection of a distant construction site with the 'outer world' when no alternatives are available. The paper briefly presents the essence of each technology, describes the pre-requisites for its use in construction, outlines the key advantages, limits and shortcomings, and lists construction projects where it shall be worthwhile to use a specific technology projects.

  3. NEW INSTRUMENTS FOR MANAGEMENT OF CONSTRUCTION PROGRAMS AND PROJECTS IN THE NEW ECONOMY STRUCTURE

    Directory of Open Access Journals (Sweden)

    Silka Dmitriy Nikolaevich

    2017-11-01

    Full Text Available Subject: the new economy structure is directly related to the active application of digital technologies. Economic processes are more formalized and for making administrative decisions it becomes possible to operate in a greater degree with precise criteria and information than probabilistic assumptions. As a subject of research, new tools for managing construction programs and projects are presented. Research objectives: the purpose of the study is to formulate general principles and directions for the digitization of economic relations in investment and construction activities to ensure the effectiveness of implementation of new generation projects. Materials and methods: to achieve the goal, the article shows the composition of state programs and projects in the construction sector and the system problems of their implementation. Organizational methods of increasing their effectiveness are considered. Results: the most promising areas of implementation of new management tools for investment and construction programs and projects are identified. Conclusions: the article shows the current dynamics of changes in technical and socio-economic systems at the level of construction sector. It is pointed out that the tasks of socio-economic nature require the development of unique approaches since the peculiarities of Russian legislation, of the prevailing norms and rules of economic activity prevent the direct replication of successful foreign experience.

  4. Effect of organizational structures and types of construction on perceptions of factors contributing to project failure in pakistan

    International Nuclear Information System (INIS)

    Gazder, U.; Khan, R.A.

    2018-01-01

    The construction industry is viewed as the regulator of national economy globally. Its importance in Pakistan has increased greatly because of the involvement of international funding agencies in infrastructure projects. The feasibility of such projects is largely dependent upon the satisfaction of multiple stakeholders. Hence, it is important to explore the factors considered by different construction organizations in evaluating the failure of their projects. This study focuses on providing a rating of factors affecting construction project failures in the construction industry of Karachi. In addition to that, difference in perception between professionals belonging to different construction projects and organizational structures has also been evaluated. The results of this study show that factors related to project planning and management are rated higher by professionals in general. Secondly, it was also observed that client satisfaction and its related factors were rated higher by organizations with project based management structures. (author)

  5. The Comparative Effectiveness of Variants of Construction of Electricity Export Projects

    Directory of Open Access Journals (Sweden)

    Anatoly Vladimirovich Lagerev

    2014-06-01

    Full Text Available The study describes a methodological approach that evaluates the comparative efficiency of construction of export-oriented power plants and transmission lines taking into account the development of power industry in the region and uncertainty (ambiguity of initial information. At the first stage the authors determine socio-economic effects of each project of construction of export-oriented power plants. With the help of optimization models they choose options that can guarantee the balanced and cost-effective development of the regional electric power system. Then using a simulation model the researchers assess commercial viability of previously selected projects. The article applies this approach for selecting the preferred option of electricity export from Eastern Siberia to China. This study shows that the project of CPP based on Kovykta natural gas with electricity transmission line to Chinese border (near Zabaikalsk is more preferable one in comparison with other projects (CPP based on Kansk-Achinsk coal in Krasnoyarsky krai; CPP based on coal in the Republic of Buryatia and Zabaikalsky krai (Olon-Shibirskaya CPP; New Kharanorskaya CPP; CPP based on Mugunsky coal in Irkutskaya oblast

  6. Innovative Organization of Project Activity of Construction Students

    Science.gov (United States)

    Stolbova, I. D.; Aleksandrova, E. P.; Krainova, M. N.

    2017-11-01

    The construction industry competitiveness depends on its equipping with information modeling technologies. This requires training and development of human resources. The advantages of BIM-technologies are considered. The requirements for the specialists capable of promoting information modeling technologies in the construction industry are discussed. For a wide application of BIM-technologies, the problem of training personnel with a new thinking must be solved. When preparing graduates of the major “Construction”, it is necessary to introduce innovative educational technologies aimed at building the students’ ability for team work, competences in the field of modern information and communication technologies, as well as design skills basing on spatial modeling. Graphic training is the first discipline of the professional orientation for construction students. In the context of training it is important to create such learning environment that is close to a professional one. The paper provides the examples of practice-oriented assignments based on the project method in the course of students’ independent work.

  7. Prioritization of Delay Factors for NPP Construction Risk in International Project by Using AHP Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Hossen, Muhammed Mufazzal; Kang, Sunkoo; Kim, Jonghyun [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    It is crucial for the nuclear power plant project decision makers and management personnel to identify the actual factors of construction delay and their ranking in order to take preventive actions. NPP project is complex in nature and the construction phase is one of the most key phase which is subject to many factors result from many sources. From experience, nuclear projects have faced challenges similar to other complex mega projects with additional nuclear specific issues and life time cost of nuclear reactor is concentrated upfront as capital cost, and therefore delays in construction may become intolerable in terms of both lost revenues and interest on the capital. Budget over-runs and delays on next generation new build nuclear projects in recent years clearly demonstrate that the nuclear industry continues to repeat its failed management and project control processes of the past. Similar to major infra-structure projects, actual completion times can vary substantially from initial estimates but this uncertainty is too crucial to the nuclear industry due to high levels of capital at risk, for every year a project is delayed the levelized cost of electricity increases by approximately 8-10%. causes of delay, to develop a generalized AHP model for delay factors, and to prioritize the risk in different factors in various levels of construction phase in international turnkey NPP project. This paper describes and prioritizes Nuclear Power Plant (NPP) construction schedule delay factor for turnkey international project. This study also determines the different party's importance in percentage behind the construction schedule delay of NPP which constitutes main contractor (28.4%), regulatory authority (27.3%), financial and country factor (23.5%), and utility (20.8%). Decision makers of nuclear industry can understand the significance of different factors on NPP construction phase and they can apply risk informed decision making to avoid unexpected

  8. Prioritization of Delay Factors for NPP Construction Risk in International Project by Using AHP Methodology

    International Nuclear Information System (INIS)

    Hossen, Muhammed Mufazzal; Kang, Sunkoo; Kim, Jonghyun

    2014-01-01

    It is crucial for the nuclear power plant project decision makers and management personnel to identify the actual factors of construction delay and their ranking in order to take preventive actions. NPP project is complex in nature and the construction phase is one of the most key phase which is subject to many factors result from many sources. From experience, nuclear projects have faced challenges similar to other complex mega projects with additional nuclear specific issues and life time cost of nuclear reactor is concentrated upfront as capital cost, and therefore delays in construction may become intolerable in terms of both lost revenues and interest on the capital. Budget over-runs and delays on next generation new build nuclear projects in recent years clearly demonstrate that the nuclear industry continues to repeat its failed management and project control processes of the past. Similar to major infra-structure projects, actual completion times can vary substantially from initial estimates but this uncertainty is too crucial to the nuclear industry due to high levels of capital at risk, for every year a project is delayed the levelized cost of electricity increases by approximately 8-10%. causes of delay, to develop a generalized AHP model for delay factors, and to prioritize the risk in different factors in various levels of construction phase in international turnkey NPP project. This paper describes and prioritizes Nuclear Power Plant (NPP) construction schedule delay factor for turnkey international project. This study also determines the different party's importance in percentage behind the construction schedule delay of NPP which constitutes main contractor (28.4%), regulatory authority (27.3%), financial and country factor (23.5%), and utility (20.8%). Decision makers of nuclear industry can understand the significance of different factors on NPP construction phase and they can apply risk informed decision making to avoid unexpected

  9. Characteristics of worker accidents on NYSDOT construction projects.

    Science.gov (United States)

    Mohan, Satish; Zech, Wesley C

    2005-01-01

    This paper aims at providing cost-effective safety measures to protect construction workers in highway work zones, based on real data. Two types of accidents that occur in work zones were: (a) construction work area accidents, and (b) traffic accidents involving construction worker(s). A detailed analysis of work zone accidents involving 36 fatalities and 3,055 severe injuries to construction workers on New York State Department of Transportation (NYSDOT) construction projects from 1990 to 2001 established that five accident types: (a) Struck/Pinned by Large Equipment, (b) Trip or Fall (elevated), (c) Contact w/Electrical or Gas Utility, (d) Struck-by Moving/Falling Load, and (e) Crane/Lift Device Failure accounted for nearly 96% of the fatal accidents, nearly 63% of the hospital-level injury accidents, and nearly 91% of the total costs. These construction work area accidents had a total cost of $133.8 million. Traffic accidents that involve contractors' employees were also examined. Statistical analyses of the traffic accidents established that five traffic accident types: (a) Work Space Intrusion, (b) Worker Struck-by Vehicle Inside Work Space, (c) Flagger Struck-by Vehicle, (d) Worker Struck-by Vehicle Entering/Exiting Work Space, and (e) Construction Equipment Struck-by Vehicle Inside Work Space accounted for nearly 86% of the fatal, nearly 70% of the hospital-level injury and minor injury traffic accidents, and $45.4 million (79.4%) of the total traffic accident costs. The results of this paper provide real statistics on construction worker related accidents reported on construction work zones. Potential preventions based on real statistics have also been suggested. The ranking of accident types, both within the work area as well as in traffic, will guide the heavy highway contractor and owner agencies in identifying the most cost effective safety preventions.

  10. Projects of Iberdrola Engineering and Construction on the Flamanville 3 EPR

    International Nuclear Information System (INIS)

    Zornoza, J.; Dumas, H.; Sesma, J. L.; Cubian, B.; Diaz, J. I.

    2013-01-01

    Iberdrola Engineering and Construction is participating during the last 5 years in 5 projects on the Flamanville 3 EPR, both in the nuclear island and conventional island and the pump house. These projects represent a challenge from the technical point of view due to the high requirements applicable to the project because of the experience feedback of the operator EDF and of compliance with new regulations that have emerged since the completion of the last nuclear power station in France. This paper presents the description of these projects, as well as its current status. (Author)

  11. Valuation of Construction Projects Based on of Quantity Scale by using Expert System

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2016-02-01

    Full Text Available The subject of an valuation of quality of construction projects is one of the topics which it becomes necessary of the absence of the quantity standards in measuring the control works and the quality valuation standards in constructional projects. In the time being it depends on the experience of the workers which leads to an apparent differences in the valuation. The idea of this research came to put the standards to evaluate the quality of the projects in a special system depending on quantity scale nor quality specifying in order to prepare an expert system “ Crystal “ to apply this special system to able the engineers to valuate the quality of their projects easily and in more accurate ways.

  12. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  13. GHG emission quantification for pavement construction projects using a process-based approach

    Directory of Open Access Journals (Sweden)

    Charinee Limsawasd

    2017-03-01

    Full Text Available Climate change and greenhouse gas (GHG emissions have attracted much attention for their impacts upon the global environment. Initiating of new legislation and regulations for control of GHG emissions from the industrial sectors has been applied to address this problem. The transportation industries, which include operation of road pavement and pavement construction equipment, are the highest GHG-emitting sectors. This study presents a novel quantification model of GHG emissions of pavement construction using process-based analysis. The model is composed of five modules that evaluate GHG emissions. These are: material production and acquisition, (2 material transport to a project site, (3 heavy equipment use, (4 on-site machinery use, and, (5 on-site electricity use. The model was applied to a hypothetical pavement project to compare the environmental impacts of flexible and rigid pavement types during construction. The resulting model can be used for evaluation of environmental impacts, as well as for designing and planning highway pavement construction.

  14. CONSTRUCTION PROJECTS VERSUS THE PROTECTION OF NATURE AND ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Elżbieta Hanna Szafranko

    2017-02-01

    Full Text Available Construction investments are related to the economic development of each country. Expansion of towns and settlements, construction, industrial, commercial and recreational objects and the communication network is necessary and results from regional development strategies. For their implementation it is necessary to prepare the area designated for their development. In many regions of our country area suitable for construction are increasingly limited, and furthermore investors often looks for an attractive investment location. For this reason, more and more construction projects dangerously close to areas of high natural value and protected and often are entering the these areas. To minimize the negative investment impact on the environment there are developed several variants of investment. Next, assessing the positive and negative effects, we choose the best, from the point of view of the surrounding environment solution. To illustrate the procedure example of analysis using the method proposed by the author, the indicator is shown.

  15. Commutative algebra constructive methods finite projective modules

    CERN Document Server

    Lombardi, Henri

    2015-01-01

    Translated from the popular French edition, this book offers a detailed introduction to various basic concepts, methods, principles, and results of commutative algebra. It takes a constructive viewpoint in commutative algebra and studies algorithmic approaches alongside several abstract classical theories. Indeed, it revisits these traditional topics with a new and simplifying manner, making the subject both accessible and innovative. The algorithmic aspects of such naturally abstract topics as Galois theory, Dedekind rings, Prüfer rings, finitely generated projective modules, dimension theory of commutative rings, and others in the current treatise, are all analysed in the spirit of the great developers of constructive algebra in the nineteenth century. This updated and revised edition contains over 350 well-arranged exercises, together with their helpful hints for solution. A basic knowledge of linear algebra, group theory, elementary number theory as well as the fundamentals of ring and module theory is r...

  16. Discussion on the method of environmental radiological impact assessment for the highway construction project

    International Nuclear Information System (INIS)

    Qiu Guohua

    2008-01-01

    Based on the characteristics and environmental radiological impact of the highway construction project, the basic procedure of environmental radiological impact assessment for the highway construction project is put forward, including analysis and determination of contamination sources, selection of evaluation factors, determination of assessment range and dose limit, environmental investigation, environmental impact prediction and assessment. The working method of each procedure is analyzed. (authors)

  17. Measuring Carbon Footprint of Flexible Pavement Construction Project in Indonesia

    Directory of Open Access Journals (Sweden)

    Utomo Dwi Hatmoko Jati

    2018-01-01

    Full Text Available Road infrastructure in Indonesia is mainly dominated by flexible pavement type. Its construction process, however, has raised concerns in terms of its environment impacts. This study aims to track and measure the carbon footprint of flexible pavement. The objectives are to map the construction process in relation to greenhouse gas (GHG emissions, to quantify them in terms of carbon dioxide equivalents (CO2e as generated by the process of production and transportation of raw materials, and the operation of plant off-site and on-site project. Data collection was done by having site observations and interviews with project stakeholders. The results show a total emissions of 70.888 tonnes CO2e, consisting of 34.248 tonnes CO2e (48.31% off-site activities and 36.640 tonnes CO2e (51.687% on-site activities. The two highest CO2e emissions were generated by the use of plant for asphalt concrete laying activities accounted 34.827 tonnes CO2e (49.130%, and material transportation accounted 24.921 (35.155%. These findings provide a new perspective of the carbon footprint in flexible pavement and suggest the urgent need for the use of more efficient and environmentally friendly plant in construction process as it shows the most significant contribution on the CO2e. This study provides valuable understanding on the environmental impact of typical flexible pavement projects in Indonesia, and further can be used for developing green road framework.

  18. Measuring Carbon Footprint of Flexible Pavement Construction Project in Indonesia

    Science.gov (United States)

    Hatmoko, Jati Utomo Dwi; Hidayat, Arif; Setiawati, Apsari; Prasetyo, Stefanus Catur Adi

    2018-02-01

    Road infrastructure in Indonesia is mainly dominated by flexible pavement type. Its construction process, however, has raised concerns in terms of its environment impacts. This study aims to track and measure the carbon footprint of flexible pavement. The objectives are to map the construction process in relation to greenhouse gas (GHG) emissions, to quantify them in terms of carbon dioxide equivalents (CO2e) as generated by the process of production and transportation of raw materials, and the operation of plant off-site and on-site project. Data collection was done by having site observations and interviews with project stakeholders. The results show a total emissions of 70.888 tonnes CO2e, consisting of 34.248 tonnes CO2e (48.31%) off-site activities and 36.640 tonnes CO2e (51.687%) on-site activities. The two highest CO2e emissions were generated by the use of plant for asphalt concrete laying activities accounted 34.827 tonnes CO2e (49.130%), and material transportation accounted 24.921 (35.155%). These findings provide a new perspective of the carbon footprint in flexible pavement and suggest the urgent need for the use of more efficient and environmentally friendly plant in construction process as it shows the most significant contribution on the CO2e. This study provides valuable understanding on the environmental impact of typical flexible pavement projects in Indonesia, and further can be used for developing green road framework.

  19. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    Science.gov (United States)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  20. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    Directory of Open Access Journals (Sweden)

    Argaw Tarekegn Gurmu

    2016-09-01

    Full Text Available This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry-wide survey to prioritize the best practices. Accordingly, project start-up plan, traffic control plan, machinery positioning strategy, project completion plan, and dynamic site layout plan were shown to be the top five best practices for construction methods. The study also revealed that high levels of implementation of best practices are associated with low levels of project delays. The use of best practices also varied according to the project costs. There were no discernible differences between the top five best practices. The authors suggest that they should be implemented jointly to improve productivity in building projects. Contractors could use the logistic regression model developed, to predict the probability of exceeding a baseline productivity factor and, on that basis, implement corrective actions to achieve the desired level of productivity.

  1. The open prototype for educational NanoSats: Fixing the other side of the small satellite cost equation

    Science.gov (United States)

    Berk, Josh; Straub, Jeremy; Whalen, David

    Government supported nano-satellite launch programs and emerging commercial small satellite launch services are reducing the cost of access to space for educational and other CubeSat projects. The cost and complexity of designing and building these satellites remains a vexing complication for many would be CubeSat aspirants. The Open Prototype for Educational NanoSats (OPEN), a proposed nano-satellite development platform, is described in this paper. OPEN endeavors to reduce the costs and risks associated with educational, government and commercial nano-satellite development. OPEN provides free and publicly available plans for building, testing and operating a versatile, low-cost satellite, based on the standardized CubeSat form-factor. OPEN consists of public-domain educational reference plans, complete with engineering schematics, CAD files, construction and test instructions as well as ancillary reference materials relevant to satellite building and operation. By making the plan, to produce a small but capable spacecraft freely available, OPEN seeks to lower the barriers to access on the other side (non-launch costs) of the satellite cost equation.

  2. Assessment of Lean Construction Principles: A Case Study at Semarang Medical Centre Hospital Project

    Directory of Open Access Journals (Sweden)

    Matias Roy Adi Wijaya

    2016-06-01

    Full Text Available The lean construction frameworks have been developed for years to enhance the poor performance of Indonesian project delivery system which influenced by the waste of non-value adding activities. Never the less most of the developments were limited on working process and lack in people empowerment. Toyota Way which integrate working process optimization and people empowerment, was developed as a lean construction frame works. This paper aimed to assess the implementation of Toyota Way principles in project delivery system by observing project’s delivery current state (status quo. The assessment began by conducting a questionnaire survey about Toyota Way implementation which then validated by interview with involved stakeholders and field observation. The assessment showed that project’s stakeholders were still unfamiliar with Toyota Way concept. Although some Toyota Way guidelines have been used in projects completion process such as visual management and training program, it found that those guidelines had not fully implemented. The project delivery system was lack of process focus and concerns more on relationship inter-parties. It also found thatToyota Way implementation will constrained by the difficulties to change the status quo of project delivery. Moreover, it seems that construction projects need practical guidelines to simplify the Toyota Way implementation in project delivery system such as project flow evaluation and system of reflection.

  3. Comparing Performance of Government and Private Clients in Construction Projects: Contractors’ Perspective

    OpenAIRE

    Jati Utomo Dwi Hatmoko; Riqi Radian Khasania

    2016-01-01

    By nature, government and private projects have different characteristics, which influence client performance. This research aims to compare performance of government and private clients in construction projects as perceived by contractors. Six client performance indicators were used, i.e. understanding of project requirements, financial, decision making, management skills, supports for contractor, and client’s attitude. Data were collected through questionnaire surveys filled in by 117 respo...

  4. Analysis of floor technology scheme in open-top construction of nuclear power project

    International Nuclear Information System (INIS)

    Zhang Shuxia; Lu Qinwu; Han Xiaoping

    2014-01-01

    Open-top construction is general technology in Ⅲ generation in nuclear power project. Because traditional floor structure and its form board upholding doesn't meet open-top construction, four floor scheme are presented, whose characters, advantages and disadvantages, and its application are summarized. The research results will help to the application of open-top construction. (authors)

  5. Formation Flying/Satellite Swarm Concept Project

    Science.gov (United States)

    Youngquist, Robert C.

    2014-01-01

    NASA needs a method of not only propelling and rotating small satellites, but also to track their position and orientation. We propose a concept that will, for the first time, demonstrate both tracking and propulsion simultaneously in the same system.

  6. Individual Learning in Construction Projects: Professions and their Approaches

    Directory of Open Access Journals (Sweden)

    Ingeborg Wasif

    2010-10-01

    Full Text Available New materials, use of sophisticated technologies and increased customer demands, in combination with growing competition among construction companies, have led to a high organizational boundaries. The results indicate that personal networks are the most common source of learning for all professions. While clients, architects, and designers also engage in reading and attending courses, site managers and workers are less engaged in these activities. Experimenting and organizing for learning appear to be underutilized strategies by all professions. This leads to the conclusion that attempts to increase learning have to address the differences in learning behaviours of the various groups. Further, focus on experimenting and organizing for learning is a possibility to change the learning behaviour from learning as a consequence of problems to learning for future improvement.degree of specialization. For successful integration of the different professional specialists, there is a need for shared learning between project co-workers. Based on twenty eight interviews in six different Swedish construction projects, this paper illustrates strategies for individual and shared learning, among different actors and across various

  7. Challenge Study: A Project-Based Learning on a Wireless Communication System at Technical High School

    Science.gov (United States)

    Terasawa, Ikuo

    2016-01-01

    The challenge study is a project based learning curriculum at Technical High School aimed at the construction of a wireless communication system. The first period was engineering issues in the construction of an artificial satellite and the second period was a positional locating system based on the general purpose wire-less device--ZigBee device.…

  8. A Conceptual Grey Analysis Method for Construction Projects

    Directory of Open Access Journals (Sweden)

    Maria Mikela Chatzimichailidou

    2015-05-01

    Full Text Available Concerning engineers, project management is a crucial field of research and development. Projects of high uncertainty and scale are characterized by risk, primarily related to their completion time. Thus, safe duration estimations, throughout the planning of a project, are a key objective for project managers. However, traditional linear approaches fail to include and sufficiently serve the dynamic nature of activities duration. On this ground, attention should be paid to designing and implementing methodologies that approximate the duration of the activities during the phase of planning and scheduling too. The grey analysis mathematical modeling seems to gain grounds, since it gradually becomes a well-adapted and up-to-date technique for numerous scientific sectors. This paper examines the contribution of the logic behind the aforementioned analysis, aiming to predict possible future divergences of task durations in big construction projects. Based on time observations of critical instances, a conceptual method is developed for making duration estimations and communicating deviations from the original schedule, in a way that approximations will fit reality better. The whole procedure endeavors to investigate the decrease of uncertainty, regarding project completion time and reduce, up to a scale, a possible inaccurate estimation of a project manager. The utmost effort is about exploiting the gained experience and eliminating the “hedgehog syndrome”. This is attainable by designing a reliable, easily updated, and readable information system. An enlightening example is to be found in the last section.

  9. Multi-model-based Access Control in Construction Projects

    Directory of Open Access Journals (Sweden)

    Frank Hilbert

    2012-04-01

    Full Text Available During the execution of large scale construction projects performed by Virtual Organizations (VO, relatively complex technical models have to be exchanged between the VO members. For linking the trade and transfer of these models, a so-called multi-model container format was developed. Considering the different skills and tasks of the involved partners, it is not necessary for them to know all the models in every technical detailing. Furthermore, the model size can lead to a delay in communication. In this paper an approach is presented for defining model cut-outs according to the current project context. Dynamic dependencies to the project context as well as static dependencies on the organizational structure are mapped in a context-sensitive rule. As a result, an approach for dynamic filtering of multi-models is obtained which ensures, together with a filtering service, that the involved VO members get a simplified view of complex multi-models as well as sufficient permissions depending on their tasks.

  10. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    OpenAIRE

    Özlem Tüz; Şafak Ebesek

    2013-01-01

    Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of th...

  11. A successful waste stream analysis on a large construction project in a radiologically controlled area

    International Nuclear Information System (INIS)

    Kennicott, M.; Richardson, D.; Starke, T.P.

    1997-01-01

    The Los Alamos National Laboratory (the Laboratory) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently under going a major, multi-year demolition and construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D and D) job and are identical to the requirements of any of several upgrades projects anticipated for the laboratory and other Department of Energy (DOE) sites. For these reasons the CMR upgrades Project is seen as an ideal model facility--to test the application and measure the success of waste minimization techniques which could be implemented for any similar projects. The purpose of this paper will be to discuss the successful completion of a waste stream analysis. The analyses performed was to measure the potential impact of waste generation, in terms of volume and costs, for a reconfiguration option being considered to change the approach and execution of the original project

  12. Identifying the Critical Factors Affecting Safety Program Performance for Construction Projects within Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Zubair Ahmed Memon

    2013-04-01

    Full Text Available Many studies have shown that the construction industry one of the most hazardous industries with its high rates of fatalities and injuries and high financial losses incurred through work related accident. To reduce or overcome the safety issues on construction sites, different safety programs are introduced by construction firms. A questionnaire survey study was conducted to highlight the influence of the Construction Safety Factors on safety program implementation. The input from the questionnaire survey was analyzed by using AIM (Average Index Method and rank correlation test was conducted between different groups of respondents to measure the association between different groups of respondent. The finding of this study highlighted that management support is the critical factor for implementing the safety program on projects. From statistical test, it is concluded that all respondent groups were strongly in the favor of management support factor as CSF (Critical Success Factor. The findings of this study were validated on selected case studies. Results of the case studies will help to know the effect of the factors on implementing safety programs during the execution stage.

  13. Measurement plan and observational construction program on drift excavation at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Yamasaki, Masanao; Yamaguchi, Takehiro; Funaki, Hironori; Fujikawa, Daisuke; Tsusaka, Kimikazu

    2008-09-01

    The Horonobe URL Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, 'Geoscientific Research' and 'R and D' on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. On the Horonobe URL Project, 'Phase 1' was finished in 2005FY and construction of the underground facility was started since then. Now, 'Phase 2' (investigations during construction of the underground facilities) is on-going. On the 'Development of engineering techniques for use in the deep underground environment' in Phase 1, based on the various types of data acquired on investigations from the surface, the design of underground facility in advance was planned. At the inception of the Phase II investigations, an investigation report titled 'Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe URL Project' (hereinafter referred to as 'Observational Construction Program') was published. The Observational Construction Program summarizes followings from the Phase I investigations: measurements for safety/reasonable construction, measurements for R and D on enhancement of shaft design/construction technology, and measurements for verification of the deep geological environment model estimated before shaft excavation, and it is on-going. This report summarizes the measurement plan during construction of drifts based on the design in advance and the observational construction program for feedback measurements data into design and construction on subsequent steps. This report also describes about design and construction management program of underground facility and R and D program on

  14. Croatian repository construction project - present status and main obstacles

    International Nuclear Information System (INIS)

    Kucar Dragicevic, S.; Subasic, D.; Schaller, A.; Lokner, V.; Cerskov Klika, M.

    1999-01-01

    Croatia has been preparing backgrounds for the construction of the repository for low and intermediate radioactive waste on its territory, almost for a decade, now. In the name of Hrvtaska elektroprivreda, the co-owner of the NE Krsko, APO has been co-ordinating and organising numerous activities and projects during that time period. Siting process, safety assessment, disposal technology and repository design and public acceptance issues are the main fields of activities. The overall status of the project at the moment, including the overview of the present status of the main four aspects of activities, will be presented. Relatively, big and important progress made on the project work out during the last two years, as well as the main obstacles we were faced with during that time period, will be discussed.(author)

  15. BASIC ACTUAL AND EFFECTIVENESS OF LEADERSHIP STYLES OF CONSTRUCTION PROJECT MANAGERS IN SURABAYA

    Directory of Open Access Journals (Sweden)

    Andi Andi

    2004-01-01

    Full Text Available Leading is one of the most important facets in managing construction projects, and behaving as an effective leader is a vital project manager’s responsibility to ensure that work efforts of other persons are directed toward the accomplishment of organizational objectives. This paper aims to determine basic and actual leadership styles of construction project managers in Surabaya. The effectiveness of the actual leadership style is also examined. To accomplish the objective, the paper first briefly reviews the ways in which leadership is approached. Data were then collected through an empirical survey to 46 project managers, taking Fiedler and Hersey-Blanchard’s models as the point of departure. The results indicate that the basic leadership of project managers in Surabaya falls slightly on task-oriented behavior. Meanwhile selling is the most common style used as actual leadership in practice. The paper discusses the effectiveness of the styles adopted and situational variables affecting.

  16. The use of interorganisational ICT in United States construction projects

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    In recent research, the use of ICT applications in real time construction projects have been documented and analysed extensively. However, there is a need for identifying and analysing in-depth the mechanisms influencing the use of interorganisational ICT applications and for solutions to eliminate

  17. An Index to Measure Sustainability of a Business Project in the Construction Industry: Lithuanian Case

    Directory of Open Access Journals (Sweden)

    Nomeda Dobrovolskienė

    2015-12-01

    Full Text Available The continuous growth of the world population, resource scarcity and the threat of climate change pose numerous environmental and social problems to the world. Therefore, much hope is put in the concept of sustainability. Companies are increasingly coming under strong global pressure to incorporate sustainability considerations into their project decision-making process. Business projects in the construction industry are among the most important, as this sector is one of the largest sectors and of major importance for the national economy and therefore has a huge impact on the environment and society. Thus, we have to explore ways to integrate sustainability into the management of those projects. This paper presents a composite sustainability index of a project (CSIP which has been created following a review of existing literature and a pilot research study. A pilot research study was conducted in the Lithuanian construction industry between January 2015 and June 2015. Sustainability criteria were chosen and grouped on the basis of the analysis of the literature and different standards relating to sustainability applicable in the construction industry. A survey was used to select and rank the most important sustainability criteria. The index was constructed using multi-criteria decision-making methods. The results of the pilot study revealed that practitioners in the Lithuanian construction sector attach most importance to 15 sustainability criteria. A composite sustainability index of a project combining all these criteria may be useful in assessing the sustainability of a business project and making decisions regarding project portfolio selection and financial resource allocation. When addressing the issue of financial resource allocation in a project portfolio, the decision-maker could take into account not only the project’s return and risk, but also its sustainability. The understanding of this study should enable companies to execute

  18. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  19. Lessons Learned from Past and Ongoing Construction Projects

    International Nuclear Information System (INIS)

    Tabatabai, Omid

    2011-01-01

    Full text of publication follows: The nuclear industry in the U.S. faced many construction quality and design issues in the 1970's and 1980's. In 1984, the NRC issued NUREG-1055, 'Improving Quality and the Assurance of Quality in the Design and Construction of Nuclear Power Plants,' to document the lessons learned from nuclear power plant (NPP) construction in the U.S. In recent years, several countries have begun either planning for or actually constructing new NPPs. For instance, in the U.S., the nuclear industry has submitted several combined license and design certification applications to the NRC for licensing reviews and approval to build 30+ new NPP units. Latest construction experience from countries that are currently building new NPPs indicate that these countries are dealing with challenges that are similar to those issues that caused major quality assurance problems, delays, or even termination of several projects in U.S. in the 70's and 80's. The U.S. NRC is pro-actively taking measures to improve its regulatory programs as well as construction oversight activities before new NPPs construction begin in the U.S. In late 2007, the U.S. NRC's Office of New Reactors established a construction experience program (ConE) to obtain and evaluate construction and operating experience events and to identify the lessons learned from these events. In March 2009, the NRC published an Office Instruction to provide a process for incorporating the lessons learned and insights from the design, construction, and operation of the international and domestic NPPs into the licensing reviews, inspections, and construction of new reactors in the U.S. Additionally, the ConE program staff developed a Web-enabled database to store, manage, and make construction experience information available to all NRC technical reviewers as well as inspectors. Because this database contains information from other countries' regulators that are considered

  20. Risk assessment for construction projects of transport infrastructure objects

    Science.gov (United States)

    Titarenko, Boris

    2017-10-01

    The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.

  1. Bayesian-network-based safety risk analysis in construction projects

    International Nuclear Information System (INIS)

    Zhang, Limao; Wu, Xianguo; Skibniewski, Miroslaw J.; Zhong, Jingbing; Lu, Yujie

    2014-01-01

    This paper presents a systemic decision support approach for safety risk analysis under uncertainty in tunnel construction. Fuzzy Bayesian Networks (FBN) is used to investigate causal relationships between tunnel-induced damage and its influential variables based upon the risk/hazard mechanism analysis. Aiming to overcome limitations on the current probability estimation, an expert confidence indicator is proposed to ensure the reliability of the surveyed data for fuzzy probability assessment of basic risk factors. A detailed fuzzy-based inference procedure is developed, which has a capacity of implementing deductive reasoning, sensitivity analysis and abductive reasoning. The “3σ criterion” is adopted to calculate the characteristic values of a triangular fuzzy number in the probability fuzzification process, and the α-weighted valuation method is adopted for defuzzification. The construction safety analysis progress is extended to the entire life cycle of risk-prone events, including the pre-accident, during-construction continuous and post-accident control. A typical hazard concerning the tunnel leakage in the construction of Wuhan Yangtze Metro Tunnel in China is presented as a case study, in order to verify the applicability of the proposed approach. The results demonstrate the feasibility of the proposed approach and its application potential. A comparison of advantages and disadvantages between FBN and fuzzy fault tree analysis (FFTA) as risk analysis tools is also conducted. The proposed approach can be used to provide guidelines for safety analysis and management in construction projects, and thus increase the likelihood of a successful project in a complex environment. - Highlights: • A systemic Bayesian network based approach for safety risk analysis is developed. • An expert confidence indicator for probability fuzzification is proposed. • Safety risk analysis progress is extended to entire life cycle of risk-prone events. • A typical

  2. Lake Robertson hydroelectric project. Construction of a roller compacted concrete dam

    Energy Technology Data Exchange (ETDEWEB)

    Labelle, M.; Robitaille, F. [Hydro-Quebec, Montreal, PQ (Canada)

    1995-12-31

    Construction of the Lake Robertson hydroelectric project on Quebec`s Lower North Shore was discussed in detail. The dam and powerhouse, located on the HaHa River, consists of a 134 m long concrete gravity dam, and a 21 MW powerhouse with two 69 kV transmission lines and four substations. The climate, terrain, and geography of the region, all of them characterized as severe, and the logistics of construction of the dam and power lines, aggravated by the isolation and severe conditions at the site, were described. The roller compacted concrete design and construction were noted, and justification for a concrete dam over an earth-fill dam was provided. Economics, properties, and composition of the roller compacted concrete (RCC) were examined, and control test results for the RCC concrete were provided. The use of RCC for the Lake Robertson development was described as successful in terms of the quality, watertightness, and completion time. The experience gained by the participants will make it possible to offer RCC as an alternative on various other projects. 2 figs.

  3. Constructions and classifications of projective Poisson varieties.

    Science.gov (United States)

    Pym, Brent

    2018-01-01

    This paper is intended both as an introduction to the algebraic geometry of holomorphic Poisson brackets, and as a survey of results on the classification of projective Poisson manifolds that have been obtained in the past 20 years. It is based on the lecture series delivered by the author at the Poisson 2016 Summer School in Geneva. The paper begins with a detailed treatment of Poisson surfaces, including adjunction, ruled surfaces and blowups, and leading to a statement of the full birational classification. We then describe several constructions of Poisson threefolds, outlining the classification in the regular case, and the case of rank-one Fano threefolds (such as projective space). Following a brief introduction to the notion of Poisson subspaces, we discuss Bondal's conjecture on the dimensions of degeneracy loci on Poisson Fano manifolds. We close with a discussion of log symplectic manifolds with simple normal crossings degeneracy divisor, including a new proof of the classification in the case of rank-one Fano manifolds.

  4. Constructions and classifications of projective Poisson varieties

    Science.gov (United States)

    Pym, Brent

    2018-03-01

    This paper is intended both as an introduction to the algebraic geometry of holomorphic Poisson brackets, and as a survey of results on the classification of projective Poisson manifolds that have been obtained in the past 20 years. It is based on the lecture series delivered by the author at the Poisson 2016 Summer School in Geneva. The paper begins with a detailed treatment of Poisson surfaces, including adjunction, ruled surfaces and blowups, and leading to a statement of the full birational classification. We then describe several constructions of Poisson threefolds, outlining the classification in the regular case, and the case of rank-one Fano threefolds (such as projective space). Following a brief introduction to the notion of Poisson subspaces, we discuss Bondal's conjecture on the dimensions of degeneracy loci on Poisson Fano manifolds. We close with a discussion of log symplectic manifolds with simple normal crossings degeneracy divisor, including a new proof of the classification in the case of rank-one Fano manifolds.

  5. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  6. A model of how features of construction projects influence accident occurrence

    OpenAIRE

    Manu, P.

    2017-01-01

    This book chapter in "Valuing People in Construction" (edited by Emuze, F. and Smallwood, J.) presents a study which sought empirical verification of a model of how construction project features (CPFs) influence accident occurrence. A qualitative strategy, in particular phenomenology, involving a range of in-depth interviews with practitioners was used and the findings were subsequently validated using a credibility check involving a survey. Altogether, the findings of the interviews and cred...

  7. User-inspired design methodology using Affordance Structure Matrix (ASM) for construction projects

    OpenAIRE

    Maheswari J. Uma; Charlesraj V. Paul C.; Battacharya Soma

    2017-01-01

    Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost am...

  8. Towards the use of knotworking for increasing innovation in construction projects

    DEFF Research Database (Denmark)

    Klitgaard, Anne; Beck, Frederikke; Andersen, Michael

    2017-01-01

    Knotworking is an emerging collaboration form in the built environment, which promises to encourage innovation at Construction project level. This study of knotworking processes is part of a larger research program about collaboration in the built environment. In this study of Knotworking......, the focus has been on how the participating organizations and professionals can learn how to participate in knotworking. A facilitator was introduced to establish how facilitators can assist the participating organizations in a construction project to learn to produce knowledge and innovation through...... knotworking. The theoretical foundation is Activity Theory, the data collection method derives from applied ethnomethodology using a blend of video recording and participant observation. The data has been collected in a series of planning meetings and one workshop about building a new kindergarten...

  9. Positive experience in the construction and project management of Kashiwazaki-Kariwa no. 6 and no. 7

    International Nuclear Information System (INIS)

    Minematsu, A.

    1999-01-01

    Kashiwazaki-Kariwa No.6 and No.7 (K-6/7), the world first Advanced Boiling Water Reactor (ABWR) units, started commercial operations on November 7, 1996 and July 2, 1997 respectively. ABWR has been developed as a standard design of the next generation BWR to meet common goals set by the Japanese electric utilities and BWR manufacturers (GE, Hitachi and Toshiba) based on our design, construction, operation and maintenance experience of nuclear power plants. The construction of K-6/7 and confirmatory tests for the verification of the first-of-a-kind (FOAK) design features of ABWR were conducted smoothly without any delay. The duration of the construction was 51.5 months. It was shorter than conventional BWRs in Japan by nearly one year. This was realized by design features of ABWR for better constructability, a principle of 'test before use' applied to the FOAKs, advanced construction technology, detailed engineering at very early stages of the project, and good construction management. The positive experience in the K-6/7 project is now being reviewed and standardized for next ABWR projects. The data and knowledge accumulated through the K-6/7 project will be utilized effectively with the aide of the latest information technology. (author)

  10. Anomalies and contradictions in an airport construction project: a historical analysis based on Cultural-Historical Activity Theory.

    Science.gov (United States)

    Lopes, Manoela Gomes Reis; Vilela, Rodolfo Andrade de Gouveia; Querol, Marco Antônio Pereira

    2018-02-19

    Large construction projects involve the functioning of a complex activity system (AS) in network format. Anomalies such as accidents, delays, reworks, etc., can be explained by contradictions that emerge historically in the system. The aim of this study was to analyze the history of an airport construction project to understand the current contradictions and anomalies in the AS and how they emerged. A case study was conducted for this purpose, combining Collective Work Analysis, interviews, observations, and analysis of documents that provided the basis for sessions in the Change Laboratory, where a participant timeline was elaborated with the principal events during the construction project. Based on the timeline, a historical analysis of the airport's AS revealed critical historical events and contradictions that explained the anomalies that occurred during the project. The analysis showed that the airport had been planned for construction with politically determined deadlines that were insufficient and inconsistent with the project's complexity. The choice of the contract modality, which assigned responsibility to a joint venture for all of the project's phases, was another critical historical event, because it allowed launching the construction before a definitive executive project had been drafted. There were also different cultures in companies working together for the first time in the context of a project with time pressures and outsourcing of activities without the necessary coordination. Identifying these contradictions and their historical origins proved essential for understanding the current situation and efforts to prevent similar situations in the future.

  11. A Principal Component Analysis of Project Management Construction Industry Competencies for the Ghanaian

    Directory of Open Access Journals (Sweden)

    Rockson Dobgegah

    2011-03-01

    Full Text Available The study adopts a data reduction technique to examine the presence of any complex structure among a set of project management competency variables. A structured survey questionnaire was administered to 100 project managers to elicit relevant data, and this achieved a relatively high response rate of 54%. After satisfying all the necessary tests of reliability of the survey instrument, sample size adequacy and population matrix, the data was subjected to principal component analysis, resulting in the identification of six new thematic project management competency areas ; and were explained in terms of human resource management and project control; construction innovation and communication; project financial resources management; project risk and quality management; business ethics and; physical resources and procurement management. These knowledge areas now form the basis for lateral project management training requirements in the context of the Ghanaian construction industry. Key contribution of the paper is manifested in the use of the principal component analysis, which has rigorously provided understanding into the complex structure and the relationship between the various knowledge areas. The originality and value of the paper is embedded in the use of contextual-task conceptual knowledge to expound the six uncorrelated empirical utility of the project management competencies.

  12. Sex Difference in Bottlenose Dolphin Sightings during a Long-term Bridge Construction Project

    Directory of Open Access Journals (Sweden)

    Ann Weaver

    2015-02-01

    Full Text Available Almost nothing is known about the effect of long-term bridge construction on free-ranging bottlenose dolphins (Tursiops truncatus. The species’ natural history predicts that there should be sex differences in reaction to construction because bottlenose dolphins show sex differences in most of their behaviors. A 5-year bridge construction project over a narrow but important dolphin corridor at John’s Pass tidal inlet, St. Petersburg FL, brought chronic environmental changes. The purpose of this 8-year study was to determine if bridge construction was associated with changes in dolphin sightings. The sex difference hypothesis was tested with a comparison of sighting probabilities before, during and after bridge construction. Sighting probabilities were generated for 68 adults seen n = 6504 times during N = 951 small-boat surveys of the 6.5-mile estuarine study area, documented with photo identification June 2005-December 2012. The sex difference hypothesis was supported with a significant interaction between construction and gender. Female sightings showed a significant linear decline across construction. Male sightings did not change across construction. The main conclusion is that adult males and females may react differently to habitat changes associated with anthropogenic activities. Sex differences in environmental monitoring and vigilance associated with maternal behavior may have played a role. This is the first report on John’s Pass dolphins that evaluates changes in their behavior during a major construction project across a narrow but important dolphin corridor.

  13. 42 CFR 137.338 - Must funds from other sources be incorporated into a construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... SELF-GOVERNANCE Construction Project Assumption Process § 137.338 Must funds from other sources be... 42 Public Health 1 2010-10-01 2010-10-01 false Must funds from other sources be incorporated into a construction project agreement? 137.338 Section 137.338 Public Health PUBLIC HEALTH SERVICE...

  14. Recent Trends of the Tropical Hydrological Cycle Inferred from Global Precipitation Climatology Project and International Satellite Cloud Climatology Project data

    Science.gov (United States)

    Zhou, Y. P.; Xu, Kuan-Man; Sud, Y. C.; Betts, A. K.

    2011-01-01

    Scores of modeling studies have shown that increasing greenhouse gases in the atmosphere impact the global hydrologic cycle; however, disagreements on regional scales are large, and thus the simulated trends of such impacts, even for regions as large as the tropics, remain uncertain. The present investigation attempts to examine such trends in the observations using satellite data products comprising Global Precipitation Climatology Project precipitation and International Satellite Cloud Climatology Project cloud and radiation. Specifically, evolving trends of the tropical hydrological cycle over the last 20-30 years were identified and analyzed. The results show (1) intensification of tropical precipitation in the rising regions of the Walker and Hadley circulations and weakening over the sinking regions of the associated overturning circulation; (2) poleward shift of the subtropical dry zones (up to 2deg/decade in June-July-August (JJA) in the Northern Hemisphere and 0.3-0.7deg/decade in June-July-August and September-October-November in the Southern Hemisphere) consistent with an overall broadening of the Hadley circulation; and (3) significant poleward migration (0.9-1.7deg/decade) of cloud boundaries of Hadley cell and plausible narrowing of the high cloudiness in the Intertropical Convergence Zone region in some seasons. These results support findings of some of the previous studies that showed strengthening of the tropical hydrological cycle and expansion of the Hadley cell that are potentially related to the recent global warming trends.

  15. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  16. REVIEW OF INTERNATIONAL PROJECTS IN А FIELD OF HUMAN MICROBIAL ECOLOGY AND CONSTRUCTION OF PROBIOTICS

    Directory of Open Access Journals (Sweden)

    S. A. Starovoitova

    2013-06-01

    Full Text Available Modern huge and world-wide known projects concerning studying of human microbial ecology and construction of probiotics, particularly: Society for Microbial Ecology and Disease, Probiotics & Health Targeted Initiative of International Science and Technology Center (TI PROBIO ISTC, Human Microbiome Project of National Institutes of Health, MetaHIT Project (Metagenomics of the Human Intestinal Tract of European Commission, Human Metabolome Project of Canadian University of Alberta and some more else were characterized in the article. Brief historical information and reference to official sites of every discussed project were given. Main goals and tasks of every project were described. Short characteristic of discussed projects and also modern accessible results of researches were given. Importance of every examined project for widening scientific knowledge in the field of human microbial ecology and also for improvement and/or for construction of modern effective probiotics on basis of human normal intestinal microflora were paid attention. Close interaction of scientific data received by realization of every discussed project was shown.

  17. Astrometry and Geostationary Satellites in Venezuela

    Science.gov (United States)

    Lacruz, E.; Abad, C.

    2015-10-01

    We present the current status and the first results of the astrometric project CIDA - ABAE for tracking geo-stationary satellites. This project aims to determine a preliminary orbit for the Venezuelan satellite VENESAT-1, using astrometric positions obtained from an optical telescope. The results presented here are based on observations from the Luepa space tracking ground station in Venezuela, which were processed using astrometric procedures.

  18. Maturity of project management in construction companies with the use of fuzzy numbers

    Science.gov (United States)

    Klaus-Rosińska, Agata; Kuchta, Dorota

    2017-07-01

    The main aim of the article is to describe issue of maturity in project management regarding construction companies. Taking into consideration this problem the literature research was made, existing project management maturity models were analyzed, model of maturity in project management (using fuzzy numbers approach) was described and tested. The results of testing stage are shown in the case study.

  19. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  20. Causal Factors of Corruption in Construction Project Management: An Overview.

    Science.gov (United States)

    Owusu, Emmanuel Kingsford; Chan, Albert P C; Shan, Ming

    2017-11-11

    The development of efficient and strategic anti-corruption measures can be better achieved if a deeper understanding and identification of the causes of corruption are established. Over the past years, many studies have been devoted to the research of corruption in construction management (CM). This has resulted in a significant increase in the body of knowledge on the subject matter, including the causative factors triggering these corrupt practices. However, an apropos systematic assessment of both past and current studies on the subject matter which is needful for the future endeavor is lacking. Moreover, there is an absence of unified view of the causative factors of corruption identified in construction project management (CPM). This paper, therefore, presents a comprehensive review of the causes of corruption from selected articles in recognized construction management journals to address the mentioned gaps. A total number of 44 causes of corruption were identified from 37 publications and analyzed in terms of existing causal factors of corruption, annual trend of publications and the thematic categorization of the identified variables. The most identifiable causes were over close relationships, poor professional ethical standards, negative industrial and working conditions, negative role models and inadequate sanctions. A conceptual framework of causes of corruption was established, after categorizing the 44 variables into five unique categories. In descending order, the five constructs are Psychosocial-Specific Causes, Organizational-Specific Causes, Regulatory-Specific Causes, Project-Specific Causes and Statutory-Specific Causes. This study extends the current literature of corruption research in construction management and contributes to a deepened understanding of the causal instigators of corruption identified in CPM. The findings from this study provide valuable information and extended knowledge to industry practitioners and policymakers as well as

  1. Effect of Pre-Construction on Construction Schedule and Client Loyalty

    OpenAIRE

    Jong Hoon Kim; Hyun-Soo Lee; Moonseo Park; Min Jeong; Inbeom Lee

    2016-01-01

    Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client sat...

  2. Projects Delay Factors of Saudi Arabia Construction Industry Using PLS-SEM Path Modelling Approach

    Directory of Open Access Journals (Sweden)

    Abdul Rahman Ismail

    2016-01-01

    Full Text Available This paper presents the development of PLS-SEM Path Model of delay factors of Saudi Arabia construction industry focussing on Mecca City. The model was developed and assessed using SmartPLS v3.0 software and it consists of 37 factors/manifests in 7 groups/independent variables and one dependent variable which is delay of the construction projects. The model was rigorously assessed at measurement and structural components and the outcomes found that the model has achieved the required threshold values. At structural level of the model, among the seven groups, the client and consultant group has the highest impact on construction delay with path coefficient β-value of 0.452 and the project management and contract administration group is having the least impact to the construction delay with β-value of 0.016. The overall model has moderate explaining power ability with R2 value of 0.197 for Saudi Arabia construction industry representation. This model will able to assist practitioners in Mecca city to pay more attention in risk analysis for potential construction delay.

  3. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    Energy Technology Data Exchange (ETDEWEB)

    Kerrigan, P.

    2012-09-01

    BSC has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  4. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    Energy Technology Data Exchange (ETDEWEB)

    Kerrigan, Philip [Building Science Corporation, Somerville, MA (United States)

    2012-09-01

    Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  5. Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan

    Directory of Open Access Journals (Sweden)

    Bonaventura H.W. Hadikusumo

    2015-01-01

    Full Text Available Hydropower construction projects are complex and uncertain, have long gestational periods and involve several parties. Furthermore, they require the integration of different components (Civil, Mechanical and Electrical to work together as a single unit. These projects require highly specialised designs, detailed plans and specifications, high-risk construction methods, effective management, skilful supervision and close coordination. Thus, claims are common in such projects. These claims are undesirable because they require significant time and resources to resolve and cause adversarial relationships among the parties involved. Therefore, it is in the common interest of all involved parties to prevent, minimise, or resolve claims as amicably as possible. Identifying common claim types and their causes is essential in devising techniques to minimise and avoid them in future projects. This report details a case study performed on a large-scale hydropower project in Bhutan. The findings of this case study indicate that differing site conditions are the major contributor of impact and change claims and 95% of total claims can be settled by negotiation, whereas 5% of claims can be settled by arbitration.

  6. CASTOR: Cathode/Anode Satellite Thruster for Orbital Repositioning

    Science.gov (United States)

    Mruphy, Gloria A.

    2010-01-01

    The purpose of CASTOR (Cathode/Anode Satellite Thruster for Orbital Repositioning) satellite is to demonstrate in Low Earth Orbit (LEO) a nanosatellite that uses a Divergent Cusped Field Thruster (DCFT) to perform orbital maneuvers representative of an orbital transfer vehicle. Powered by semi-deployable solar arrays generating 165W of power, CASTOR will achieve nearly 1 km/s of velocity increment over one year. As a technology demonstration mission, success of CASTOR in LEO will pave the way for a low cost, high delta-V orbital transfer capability for small military and civilian payloads in support of Air Force and NASA missions. The educational objective is to engage graduate and undergraduate students in critical roles in the design, development, test, carrier integration and on-orbit operations of CASTOR as a supplement to their curricular activities. This program is laying the foundation for a long-term satellite construction program at MIT. The satellite is being designed as a part of AFRL's University Nanosatellite Program, which provides the funding and a framework in which student satellite teams compete for a launch to orbit. To this end, the satellite must fit within an envelope of 50cmx50cmx60cm, have a mass of less than 50kg, and meet stringent structural and other requirements. In this framework, the CASTOR team successfully completed PDR in August 2009 and CDR in April 2010 and will compete at FCR (Flight Competition Review) in January 2011. The complexity of the project requires implementation of many systems engineering techniques which allow for development of CASTOR from conception through FCR and encompass the full design, fabrication, and testing process.

  7. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  8. Medial Temporal Lobe Contributions to Episodic Future Thinking: Scene Construction or Future Projection?

    Science.gov (United States)

    Palombo, D J; Hayes, S M; Peterson, K M; Keane, M M; Verfaellie, M

    2018-02-01

    Previous research has shown that the medial temporal lobes (MTL) are more strongly engaged when individuals think about the future than about the present, leading to the suggestion that future projection drives MTL engagement. However, future thinking tasks often involve scene processing, leaving open the alternative possibility that scene-construction demands, rather than future projection, are responsible for the MTL differences observed in prior work. This study explores this alternative account. Using functional magnetic resonance imaging, we directly contrasted MTL activity in 1) high scene-construction and low scene-construction imagination conditions matched in future thinking demands and 2) future-oriented and present-oriented imagination conditions matched in scene-construction demands. Consistent with the alternative account, the MTL was more active for the high versus low scene-construction condition. By contrast, MTL differences were not observed when comparing the future versus present conditions. Moreover, the magnitude of MTL activation was associated with the extent to which participants imagined a scene but was not associated with the extent to which participants thought about the future. These findings help disambiguate which component processes of imagination specifically involve the MTL. Published by Oxford University Press 2016.

  9. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  10. The quality control for biological-shield heavy concrete construction of nuclear power project

    International Nuclear Information System (INIS)

    Sun Hongjun; Ma Xinchao

    2012-01-01

    The paper introduces the function and characteristics of biological protective heavy-concrete, and its main application scope and role in Fangjiashan nuclear power project. From the aspects of raw material selection, mixing ratio test, heavy concrete production, the paper discusses the main control points of heavy concrete construction process, points out the basic characteristics of heavy concrete construction, and put forward measures to prevent density non-uniformity during heavy concrete construction and to control slump during transportation. Results prove that reasonable construction process control can assure the engineering quality. (authors)

  11. Radioactive environmental impact assessment for a highway construction project in Guangdong province

    International Nuclear Information System (INIS)

    Qiu Guohua

    2009-01-01

    Based on the field environmental investigation and monitoring result, the radioactive environmental impact for a highway construction project in Guangdong province has been analyzed and assessed and forecacted. (authors)

  12. Effects of construction and operation of a satellite power system upon the magnetosphere

    International Nuclear Information System (INIS)

    Chiu, Y.T.; Luhmann, J.G.; Schulz, M.; Cornwall, J.M.

    1979-01-01

    This is the final report of an initial assessment of magnetospheric effects of the construction and operation of a satellite power system. This assessment effort is based on application of present scientific knowledge rather than on original scientific research. As such, it appears that mass and energy injections of the system are sufficient to modify the magnetosphere substantially, to the extent of possibly requiring mitigation measures for space systems but not to the extent of causing major redirection of efforts and concepts. The scale of the SPS is so unprecedentedly large, however, that these impressions require verification (or rejection) by in-depth assessment based on scientific treatment of the principal issues. Indeed, it is perhaps appropriate to state that present ignorance far exceeds present knowledge in regard to SPS magnetospheric effects, even though we only seek to define the approximate limits of magnetospheric modifications here

  13. Accident Investigation on a Large Construction Project: An Ethnographic Case Study

    OpenAIRE

    Oswald, David; Smith, Simon; Sherratt, Fred

    2015-01-01

    Unsafe acts are believed to account for approximately 80 to 90 percent of accidents. This paper will investigate this issue through exploring the reasoning behind the unsafe acts that resulted in a minor accident on a large construction project (+$1B) in the UK. The study described here, part of a wider PhD project, was undertaken using an ethnographic approach. Participant observation enabled the researcher to be involved in the whole accident investigation process including witness statemen...

  14. Activities of the Center for Space Construction

    Science.gov (United States)

    1993-01-01

    The Center for Space Construction (CSC) at the University of Colorado at Boulder is one of eight University Space Engineering Research Centers established by NASA in 1988. The mission of the center is to conduct research into space technology and to directly contribute to space engineering education. The center reports to the Department of Aerospace Engineering Sciences and resides in the College of Engineering and Applied Science. The college has a long and successful track record of cultivating multi-disciplinary research and education programs. The Center for Space Construction is prominent evidence of this record. At the inception of CSC, the center was primarily founded on the need for research on in-space construction of large space systems like space stations and interplanetary space vehicles. The scope of CSC's research has now evolved to include the design and construction of all spacecraft, large and small. Within this broadened scope, our research projects seek to impact the underlying technological basis for such spacecraft as remote sensing satellites, communication satellites, and other special purpose spacecraft, as well as the technological basis for large space platforms. The center's research focuses on three areas: spacecraft structures, spacecraft operations and control, and regolith and surface systems. In the area of spacecraft structures, our current emphasis is on concepts and modeling of deployable structures, analysis of inflatable structures, structural damage detection algorithms, and composite materials for lightweight structures. In the area of spacecraft operations and control, we are continuing our previous efforts in process control of in-orbit structural assembly. In addition, we have begun two new efforts in formal approach to spacecraft flight software systems design and adaptive attitude control systems. In the area of regolith and surface systems, we are continuing the work of characterizing the physical properties of lunar

  15. Application of ABWR construction database to nuclear power plant project

    International Nuclear Information System (INIS)

    Takashima, Atsushi; Katsube, Yasuhiko

    1999-01-01

    Tokyo Electric Power Company (TEPCO) completed the construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and No. 7 (K-6/7) as the first advanced boiling water reactors (ABWR) in the world successfully. K-6 and K-7 started their commercial operations in November, 1996 and in July, 1997 respectively. We consider ABWR as a standard BWR in the world as well as in Japan because ABWR is highly reputed. However, because the interval of our nuclear power plant construction is going to be longer, our engineering level on plant construction will be declining. Hence it is necessary for us to maintain our engineering level. In addition to this circumstance, we are planning to wide application of separated purchase orders for further cost reduction. Also there is an expectation for our contribution to ABWR plant constructions overseas. As facing these circumstances, we have developed a construction database based on our experience for ABWR construction. As the first step of developing the database for these use, we analyzed our own activities in the previous ABWR construction. Through this analysis, we could define activity units of which the project consists. As the second step, we clarified the data which are treated in each activity unit and the interface among them. By taking these steps, we could develop our database efficiently. (author)

  16. The Influence of Trust on Project Management Practice within the Construction Industry

    Directory of Open Access Journals (Sweden)

    Scott Strahorn

    2017-03-01

    Full Text Available Given that any construction project is inherently a human endeavour, it follows that issues of trust are significant in terms of the stakeholder interactions that deliver eventual project outcomes.  Previous research indicates that the relational basis upon which projects are undertaken are intended to influence the likelihood of trusting relationships between stakeholders.  Thus, experiences of trust in a construction project environment are likely to be influenced by the contextual specifics of respective transactional and relational contracting (RC procurement mechanisms, given the divergent theoretical principles upon which they are founded.  The influence of trust has therefore been examined through the lived experiences of construction practitioners.  A phenomenological interview study consisting of thirty-five (35 participants was conducted with sensitivity to the procurement of experiences being recounted. Issues of trust were shown to be integral to stakeholder experiences in both procurement environments, with the benefits of trust acknowledged in many instances.  However, little understanding was evident regarding methods for building and maintaining trust, nor for repairing trust when problems arose. Importantly, despite the differing principles that underpin transactional and relational procurement, and particularly the contention that relational procurement would increase trust between trading partners, this was not evident; with individual personalities and appropriate risk apportionment shown to be greater influences upon the likelihood of trusting relationships.  It is reasonable to conjecture that relational contracts actually diminish the need for trust, given that the objective is to reduce uncertainty through formulaic approaches to risk distribution and reward; the absence of risk negates the need for trust.  Ultimately, the potential to deliver improved project outcomes as a result of proactive approaches to

  17. A Hybrid MCDM Technique for Risk Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Kajal Chatterjee

    2018-02-01

    Full Text Available Multi-stakeholder based construction projects are subject to potential risk factors due to dynamic business environment and stakeholders’ lack of knowledge. When solving project management tasks, it is necessary to quantify the main risk indicators of the projects. Managing these requires suitable risk mitigation strategies to evaluate and analyse their severity. The existence of information asymmetry also causes difficulties with achieving Pareto efficiency. Hence, to ensure balanced satisfaction of all participants, risk evaluation of these projects can be considered as an important part of the multi-criteria decision-making (MCDM process. In real-life problems, evaluation of project risks is often uncertain and even incomplete, and the prevailing methodologies fail to handle such situations. To address the problem, this paper extends the analytical network process (ANP methodology in the D numbers domain to handle three types of ambiguous information’s, viz. complete, uncertain, and incomplete, and assesses the weight of risk criteria. The D numbers based approach overcomes the deficiencies of the exclusiveness hypothesis and completeness constraint of Dempster–Shafer (D–S theory. Here, preference ratings of the decision matrix for each decision-maker are determined using a D numbers extended consistent fuzzy preference relation (D-CFPR. An extended multi-attributive border approximation area comparison (MABAC method in D numbers is then developed to rank and select the best alternative risk response strategy. Finally, an illustrative example from construction sector is presented to check the feasibility of the proposed approach. For checking the reliability of alternative ranking, a comparative analysis is performed with different MCDM approaches in D numbers domain. Based on different criteria weights, a sensitivity analysis of obtained ranking of the hybrid D-ANP-MABAC model is performed to verify the robustness of the proposed

  18. Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"

    Science.gov (United States)

    Barris, Cristina; Torres, Lluís; Simon, Enric

    2016-01-01

    This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…

  19. Multimillion Dollar Construction Project Completed in Glenn's Icing Research Tunnel

    Science.gov (United States)

    Kevdzija, Susan L.

    2001-01-01

    Over the last year, the Glenn Research Center's Icing Research Tunnel (IRT) underwent a major $5.2 million rehabilitation project as part of the Construction of Facilities program. The scope of the project included redesign and replacement of the 55-yr-old heat exchanger, the addition of fan outlet guide vanes for flow conditioning downstream of the 25-ft-diameter fan, and redesign and replacement of the C and D corner-turning vanes. The purpose of the rehabilitation was to replace old portions of the infrastructure and to improve the aerodynamic flow quality in the tunnel.

  20. Ross In Situ Uranium Recovery Project NESHAP Subpart W Construction Approval

    Science.gov (United States)

    On May 5, 2015, EPA issued a Construction Approval under the National Emission Standards for Hazardous Air Pollutants (NESHAPs) at 40 CFR Part 61, subpart W, to Strata Energy, Inc., for their Ross In Situ Recovery (ISR) Uranium Project in Crook County, WY.

  1. Fast Emission Estimates in China Constrained by Satellite Observations (Invited)

    Science.gov (United States)

    Mijling, B.; van der A, R.

    2013-12-01

    Emission inventories of air pollutants are crucial information for policy makers and form important input data for air quality models. Unfortunately, bottom-up emission inventories, compiled from large quantities of statistical data, are easily outdated for an emerging economy such as China, where rapid economic growth changes emissions accordingly. Alternatively, top-down emission estimates from satellite observations of air constituents have important advantages of being spatial consistent, having high temporal resolution, and enabling emission updates shortly after the satellite data become available. Constraining emissions from concentration measurements is, however, computationally challenging. Within the GlobEmission project of the European Space Agency (ESA) a new algorithm has been developed, specifically designed for fast daily emission estimates of short-lived atmospheric species on a mesoscopic scale (0.25 × 0.25 degree) from satellite observations of column concentrations. The algorithm needs only one forward model run from a chemical transport model to calculate the sensitivity of concentration to emission, using trajectory analysis to account for transport away from the source. By using a Kalman filter in the inverse step, optimal use of the a priori knowledge and the newly observed data is made. We apply the algorithm for NOx emission estimates in East China, using the CHIMERE model together with tropospheric NO2 column retrievals of the OMI and GOME-2 satellite instruments. The observations are used to construct a monthly emission time series, which reveal important emission trends such as the emission reduction measures during the Beijing Olympic Games, and the impact and recovery from the global economic crisis. The algorithm is also able to detect emerging sources (e.g. new power plants) and improve emission information for areas where proxy data are not or badly known (e.g. shipping emissions). The new emission estimates result in a better

  2. Problems of increased transport load as a result of implementation of projects of high-rise constructions

    Science.gov (United States)

    Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda

    2018-03-01

    The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.

  3. Model and Algorithm for Substantiating Solutions for Organization of High-Rise Construction Project

    Directory of Open Access Journals (Sweden)

    Anisimov Vladimir

    2018-01-01

    Full Text Available In the paper the models and the algorithm for the optimal plan formation for the organization of the material and logistical processes of the high-rise construction project and their financial support are developed. The model is based on the representation of the optimization procedure in the form of a non-linear problem of discrete programming, which consists in minimizing the execution time of a set of interrelated works by a limited number of partially interchangeable performers while limiting the total cost of performing the work. The proposed model and algorithm are the basis for creating specific organization management methodologies for the high-rise construction project.

  4. Model and Algorithm for Substantiating Solutions for Organization of High-Rise Construction Project

    Science.gov (United States)

    Anisimov, Vladimir; Anisimov, Evgeniy; Chernysh, Anatoliy

    2018-03-01

    In the paper the models and the algorithm for the optimal plan formation for the organization of the material and logistical processes of the high-rise construction project and their financial support are developed. The model is based on the representation of the optimization procedure in the form of a non-linear problem of discrete programming, which consists in minimizing the execution time of a set of interrelated works by a limited number of partially interchangeable performers while limiting the total cost of performing the work. The proposed model and algorithm are the basis for creating specific organization management methodologies for the high-rise construction project.

  5. Satellite Eye for Galathea 3. Annual report 2006

    DEFF Research Database (Denmark)

    Hasager, Charlotte Bay; Sørensen, Peter; Pedersen, Leif Toudal

    The Satellite Eye for Galathea 3 project is collecting satellite images from many satellites and, in particular, from the European ENVISAT satellite along the Galathea 3 global route. The expedition takes place from 11 August 2006 to 27 April 2007. Prior to the expedition several satellite images...... Vædderen, pupils in the classrooms and the public at any moment can take a look at the conditions seen from the eyes of the Earth observing satellites....

  6. Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project

    Science.gov (United States)

    Zhou, Yong; Huang, You Zhen

    2018-06-01

    This paper mainly studies the green construction scheme of a high-rise residential building project. From "four sections one environmental protection", saving material, water saving, energy saving, economical use of land and environmental protection conduct analysis and research. Adopting scientific, advanced, reasonable and economical construction technology measures, implementing green construction method. Promoting energy-saving technologies in buildings, ensuring the sustainable use of resources, Maximum savings of resources and energy, increase energy efficiency, to reduce pollution, reducing the adverse environmental impact of construction activities, ensure construction safety, build sustainable buildings.

  7. THE THEORETIC-METHODOLOGICAL TOOLS OF EFFECTIVE ESTIMATION OF ORGANIZATION TECHNOLOGICAL SOLUTIONS OF CONSTRUCTION PROJECT

    Directory of Open Access Journals (Sweden)

    E. Yu. Antipenko

    2010-03-01

    Full Text Available In the article the structural analysis of efficiency indices elements of organization-and-technology solutions of construction project scheduling is executed for preparation of high-quality base of providing the planning processes and subsequent realization of the projects.

  8. Comprehensive evaluation of environmental and economic benefits of China's urban underground transportation construction projects.

    Science.gov (United States)

    Yang, Xiaobin; Chen, Zhilong; Guo, Dongjun

    2015-07-01

    Urban underground transportation projects are introduced to address problems of scarce green land and traffic pollution. As construction of urban underground transportation is still in its infancy, there is no definite quantitative measurement on whether the construction is beneficial and what influences it will place on the region in China. This study intends to construct a comprehensive evaluation method for evaluating social, economic and environmental benefits of urban underground transportation projects and proposes the concept, role and principle for evaluation of environmental and economic benefits. It figures out relationship between the environment and factors of city development. It also summarizes three relevant factors, including transportation, biophysics and social economy, and works out indicators to evaluate the influence of urban underground transportation construction. Based on Contingent Valuation Method (CVM), Cost of Illness Approach (CIA), Human Capital Approach (HCA), this paper constructs 13 monetization calculation models for social, economic and environmental benefits in response to seven aspects, namely, reducing noise pollution and air pollution, using land efficiently, improving traffic safety, reducing traffic congestion, saving shipping time and minimizing transportation costs.

  9. Development as an effective management system construction and investment projects

    Directory of Open Access Journals (Sweden)

    Beloborodov Roman S.

    2011-02-01

    Full Text Available The article presents the material of the application of the conception «Development» as the effective methodology of the investment-construction project management within the framework the systems approach. Theoretical principles of the application of this conception are generalized and systematized based on the example of the creation of the low habitable complex.

  10. Perceived Effects of Prevalent Errors in Contract Documents on Construction Projects

    Directory of Open Access Journals (Sweden)

    Oluwaseun Sunday Dosumu

    2018-03-01

    Full Text Available One of the highly rated causes of poor performance is errors in contract documents. The objectives of this study are to investigate the prevalent errors in contract documents and their effects on construction projects. Questionnaire survey and 51 case study projects (mixed method were adopted for the study. The study also involved the use of Delphi technique to extract the possible errors that may be contained in contract documents; it did not however constitute the empirical data for the study. The sample of the study consists of 985 consulting and 275 contracting firms that engaged in the construction of building projects that were completed between 2013 and 2016 and were above the ground floor. The two-stage stratified random sampling technique was adopted for the study. The data for the study were analysed with descriptive and inferential statistics (based on Shapiro-Wilk’s test. The results of the study indicate that errors in contract documents were moderately prevalent. However, overmeasurement in bill of quantities was prevalent in private, institutional and management procured projects. Traditionally procured projects contain 68% of the errors in contract documents among the procurement methods. Drawings contain the highest number of errors, followed by bill of quantities and specifications. The severe effects of errors in contract documents were structural collapse, deterioration of buildings and contractors’ claims among others. The result of the study implies that, management procurement method is the route to error minimization in developing countries, but it may need to be backed by law and guarded against overmeasurement.

  11. A review of the design, construction and development of the PUSPATI project

    International Nuclear Information System (INIS)

    Ahmad Tajuddin Ali.

    1983-01-01

    The setting up of the Tun Ismail Atomic Research Centre (PUSPATI) was decided upon in September 1972 and soon after, plans were underway for the purchase of a research reactor and the construction of a research centre to house it. The centre was originally planned to be located at Sungai Buloh about 20 km to the north-west of Kuala Lumpur. However, in September 1978, a decision was made to locate the centre at Bangi, about 32 km to south of Kuala Lumpur. Earth work was started in January 1979 with clearing of the forest at the proposed site. Building construction started in February 1980. By September 1981, the reactor building was practically completed and enable reactor construction to begin. This was finished on July 15, 1982 when the reactor was officially handed over to PUSPATI. Work on the rest of the complex fell behind schedule and was only completed in July 1983 when PUSPATI moved in to occupy the research laboratories. The implementation of the PUSPATI project has been completed not without its share of problems. Its completion also marks the beginning of a new era for the development of nuclear science and technology in this country. This paper reviews the design, construction and development of the entire project. (author)

  12. Early Involvement and Integration in Construction Projects: The Benefits of DfX in Elimination of Wastes

    Directory of Open Access Journals (Sweden)

    Heikki Halttula

    2017-12-01

    Full Text Available Typical construction processes provide waste: material waste but especially process-related waste. The majority of this waste can be avoided with efficient planning in the front end of projects. The main aim is to describe how the concept of Design for Excellence (DfX can reduce the most severe waste in construction projects. Based on a literature review of waste and requirements that aid early involvement and integration, we created a survey for analyzing and prioritizing types of waste in the construction industry. We describe how DFX reduces this waste, especially through the use of early involvement and integration. When applied, DfX creates incentives for project stakeholders to eliminate waste automatically through early involvement and integration.

  13. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  14. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  15. Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North Water Diversion Project

    Directory of Open Access Journals (Sweden)

    Jing-chun Feng

    2011-06-01

    Full Text Available Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields.

  16. Evaluating Levels of Project Planning and their Effects on Performance in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Godwin Idoro

    2012-11-01

    Full Text Available This study compares the level of project planning on public andprivate sectors projects and its impact on performance. Thepurpose is to create awareness of the level and effectivenessof the planning done by public and private clients in the deliveryof construction projects. A questionnaire survey administeredto a sample of 130 client representatives selected by stratifi edrandom sampling from the population of public and private clientsin the Nigerian construction industry is used and analysed usingdescriptive statistics, the t-test and Spearman correlation test. Theresults show that the level of preconstruction planning on privatesector projects is higher than that of public sector projects whilethe level of contract planning done by the latter is higher thanthat of the former. Furthermore, the performance of private sectorprojects is higher than that of public sector projects in many of theparameters used. However, the level of preparation of life-cyclecharts that concern project delivery time in both public and privatesectors projects is low and the level of project planning in the twocategories of projects has a limited impact on project performance.The understanding of how public and private sectors projectsperform in planning and its impact are expected to assist publicand private clients to know the challenges ahead of them in theireffort to improve the planning and performance of their projects.

  17. Identification of critical factors affecting flexibility in hospital construction projects.

    Science.gov (United States)

    Olsson, Nils E O; Hansen, Geir K

    2010-01-01

    This paper analyzes the dynamics relating to flexibility in a hospital project context. Three research questions are addressed: (1) When is flexibility used in the life cycle of a project? (2) What are the stakeholders' perspectives on project flexibility? And (3) What is the nature of the interaction between flexibility in the process of a project and flexibility in terms of the characteristics of a building? Flexibility is discussed from both a project management point of view and from a hospital architecture perspective. Flexibility in project life cycle and from a stakeholder perspective is examined, and the interaction between flexibility in scope lock-in and building flexibility is investigated. The results are based on case studies of four Norwegian hospital projects. Information relating to the projects has been obtained from evaluation reports, other relevant documents, and interviews. Observations were codified and analyzed based on selected parameters that represent different aspects of flexibility. One of the cases illustrates how late changes can have a significant negative impact on the project itself, contributing to delays and cost overruns. Another case illustrates that late scope lock-in on a limited part of the project, in this case related to medical equipment, can be done in a controlled manner. Project owners and users appear to have given flexibility high priority. Project management teams are less likely to embrace changes and late scope lock-in. Architects and consultants are important for translating program requirements into physical design. A highly flexible building did not stop some stakeholders from pushing for significant changes and extensions during construction.

  18. Quality of road construction projects in Sweden between 1990 and 2010

    Directory of Open Access Journals (Sweden)

    Abukar Warsame

    2014-03-01

    Full Text Available It has been reported that productivity developments in construction are slow compared to other sectors. Measuring productivity is however not easy and it might have been underestimated due to deficiencies in the index that is used when the value added in current prices is converted into value added at constant prices. A central problem when deflating nominal prices is that the deflation should only take away price changes for identical products and not price changes related to quality changes and improvements necessitated by new environmental conditions and legislation as well as demand for higher safety. The aim of this project is to help fill this gap by looking at the quality changes over time in road construction. A combination of comparative studies and interviews with practitioners from public and private sectors that are involved in road construction projects were conducted. It was found that there had been both direct quality changes in the roads, primarily to improve safety on the roads and for noise protection, and indirect quality changes related to building in more difficult circumstances because of giving higher weight to other social objectives, especially environmental objectives. As these quality increases are not taken into account when productivity is measured, productivity improvements could be underestimated by around 1% per year.

  19. Design and Fabrication of DebriSat - A Representative LEO Satellite for Improvements to Standard Satellite Breakup Models

    Science.gov (United States)

    Clark, S.; Dietrich, A.; Fitz-Coy, N.; Weremeyer, M.; Liou, J.-C.

    2012-01-01

    This paper discusses the design and fabrication of DebriSat, a 50 kg satellite developed to be representative of a modern low Earth orbit satellite in terms of its components, materials used, and fabrication procedures. DebriSat will be the target of a future hypervelocity impact experiment to determine the physical characteristics of debris generated after an on-orbit collision of a modern LEO satellite. The major ground-based satellite impact experiment used by DoD and NASA in their development of satellite breakup models was SOCIT, conducted in 1992. The target used for that experiment was a Navy transit satellite (40 cm, 35 kg) fabricated in the 1960's. Modern satellites are very different in materials and construction techniques than those built 40 years ago. Therefore, there is a need to conduct a similar experiment using a modern target satellite to improve the fidelity of the satellite breakup models. To ensure that DebriSat is truly representative of typical LEO missions, a comprehensive study of historical LEO satellite designs and missions within the past 15 years for satellites ranging from 1 kg to 5000 kg was conducted. This study identified modern trends in hardware, material, and construction practices utilized in recent LEO missions. Although DebriSat is an engineering model, specific attention is placed on the quality, type, and quantity of the materials used in its fabrication to ensure the integrity of the outcome. With the exception of software, all other aspects of the satellite s design, fabrication, and assembly integration and testing will be as rigorous as that of an actual flight vehicle. For example, to simulate survivability of launch loads, DebriSat will be subjected to a vibration test. As well, the satellite will undergo thermal vacuum tests to verify that the components and overall systems meet typical environmental standards. Proper assembly and integration techniques will involve comprehensive joint analysis, including the precise

  20. Use of communication technologies in document exchange for the management of construction projects

    Directory of Open Access Journals (Sweden)

    Mesároš Peter

    2016-06-01

    Full Text Available Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.

  1. Use of communication technologies in document exchange for the management of construction projects

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2016-06-01

    Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.

  2. 42 CFR 137.291 - May Self-Governance Tribes carry out construction projects without assuming these Federal...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes carry out construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Nepa Process § 137.291 May Self-Governance Tribes carry out construction projects without assuming these Federal environmental...

  3. [Principles and methodology for ecological rehabilitation and security pattern design in key project construction].

    Science.gov (United States)

    Chen, Li-Ding; Lu, Yi-He; Tian, Hui-Ying; Shi, Qian

    2007-03-01

    Global ecological security becomes increasingly important with the intensive human activities. The function of ecological security is influenced by human activities, and in return, the efficiency of human activities will also be affected by the patterns of regional ecological security. Since the 1990s, China has initiated the construction of key projects "Yangtze Three Gorges Dam", "Qinghai-Tibet Railway", "West-to-East Gas Pipeline", "West-to-East Electricity Transmission" and "South-to-North Water Transfer" , etc. The interaction between these projects and regional ecological security has particularly attracted the attention of Chinese government. It is not only important for the regional environmental protection, but also of significance for the smoothly implementation of various projects aimed to develop an ecological rehabilitation system and to design a regional ecological security pattern. This paper made a systematic analysis on the types and characteristics of key project construction and their effects on the environment, and on the basis of this, brought forward the basic principles and methodology for ecological rehabilitation and security pattern design in this construction. It was considered that the following issues should be addressed in the implementation of a key project: 1) analysis and evaluation of current regional ecological environment, 2) evaluation of anthropogenic disturbances and their ecological risk, 3) regional ecological rehabilitation and security pattern design, 4) scenario analysis of environmental benefits of regional ecological security pattern, 5) re-optimization of regional ecological system framework, and 6) establishment of regional ecosystem management plan.

  4. Evaluation of data requirements for computerized constructability analysis of pavement rehabilitation projects.

    Science.gov (United States)

    2013-08-01

    This research aimed to evaluate the data requirements for computer assisted construction planning : and staging methods that can be implemented in pavement rehabilitation projects in the state of : Georgia. Results showed that two main issues for the...

  5. Experimental Satellite Phase 3D before Launch

    Directory of Open Access Journals (Sweden)

    J. Sebesta

    1999-04-01

    Full Text Available To build a satellite can be a dream for many engineers. We are happy that we can participate in the AMSAT PHASE 3D project. Our responsibility is very high because one of our on-board receivers is the main one of the command link and will never be switched off. The project is also a very good opportunity for our students to meet satellite technology.

  6. A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence

    Directory of Open Access Journals (Sweden)

    Shi Yin

    2017-01-01

    Full Text Available Nowadays, due to the lack of natural resources and environment problems which have been appearing increasingly, green building is more and more involved in the construction industry. The evaluation and selection of green supplier are a significant part of the development of green building. In this paper, we propose a new dynamic multicriteria decision-making approach in construction projects under time sequence to deal with these problems. First, the paper establishes 4 main criteria and 17 subcriteria for green supplier selection in construction projects. Then, a method considering interaction between criteria and the influence of constructors subjective preference and objective criteria information is proposed. It uses the interval-valued intuitionistic fuzzy geometric weighted Heronian means (IVIFGWHM operator and multitarget nonlinear programming model to calculate the comprehensive evaluation results of potential green suppliers. The proposed method is much easier for constructors to select green supplier and make the localization of green supplier more practical and accurate in construction projects. Finally, a case study about a green building project is given to verify practicality and effectiveness of the proposed approach.

  7. Relevance of Partnering as an Alternative Approach to Management of Construction Projects in Ghana

    Science.gov (United States)

    Ansah, Samuel Kwame; Awere, Eric; Edu-Buandoh, Kobina Badu Micah

    2016-01-01

    Understandably, clients in both the public and the private sectors in Ghanaian construction industry have become increasingly dissatisfied. What they see is unpredictability and under-performance. What they receive is too often of poor quality, late and over-priced. More often contractors enter the construction project focusing on achieving their…

  8. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  9. Conformity Assessment as a Tool for Organizational Learning in Large Engineering and Construction Projects

    Directory of Open Access Journals (Sweden)

    Luciano Assalim

    2013-05-01

    Full Text Available For the successful realization of large engineering and construction projects (LECPs, a systemic organizational learning framework for institutional cooperation is critical. Due to the long project life-cycle of LECPs, this is particularly important for this kind of project. The objective of this paper is to analyze to what extent the conformity assessment of LECPs, carried out under Engineering, Procurement and Construction management (EPCm services, can be used as a tool for organizational learning and cooperation between typical stakeholders (project owners, engineering contractors, EPC contractors; subcontractors and certification bodies. The research, from which this paper emanates, was based on a case study concerning LECPs in an oil and gas company in Brazil. Based on its results, we suggest that the proposed organizational learning framework, supported by the conformity assessment rationale, constitutes an important management tool that can be disseminated in other organizational contexts where conformity assessments of LECPs take place.

  10. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  11. Sensitivity Analysis of Arctic Sea Ice Extent Trends and Statistical Projections Using Satellite Data

    Directory of Open Access Journals (Sweden)

    Ge Peng

    2018-02-01

    Full Text Available An ice-free Arctic summer would have pronounced impacts on global climate, coastal habitats, national security, and the shipping industry. Rapid and accelerated Arctic sea ice loss has placed the reality of an ice-free Arctic summer even closer to the present day. Accurate projection of the first Arctic ice-free summer year is extremely important for business planning and climate change mitigation, but the projection can be affected by many factors. Using an inter-calibrated satellite sea ice product, this article examines the sensitivity of decadal trends of Arctic sea ice extent and statistical projections of the first occurrence of an ice-free Arctic summer. The projection based on the linear trend of the last 20 years of data places the first Arctic ice-free summer year at 2036, 12 years earlier compared to that of the trend over the last 30 years. The results from a sensitivity analysis of six commonly used curve-fitting models show that the projected timings of the first Arctic ice-free summer year tend to be earlier for exponential, Gompertz, quadratic, and linear with lag fittings, and later for linear and log fittings. Projections of the first Arctic ice-free summer year by all six statistical models appear to converge to the 2037 ± 6 timeframe, with a spread of 17 years, and the earliest first ice-free Arctic summer year at 2031.

  12. Research on Investment Risk Management of Chinese Prefabricated Construction Projects Based on a System Dynamics Model

    Directory of Open Access Journals (Sweden)

    Ming Li

    2017-09-01

    Full Text Available Prefabricated construction, a new direction for the future development of the Chinese construction industry, can maximize the requirements of “green”. As a new form of green building, prefabricated construction is of particular interest. On account of the immature development of the green building market in China, the investment risk for prefabricated construction is higher than for traditional architecture. Hence, it is especially important to improve its investment risk identification and management. This study adopts system dynamics and builds a risk identification feedback chart and risk flow chart, to comprehensively identify investment risks that projects in China may face and to process quantitative estimation of investment risk factors. Key factors influencing project investment risks are found, and corresponding measures are pointedly proposed. This paper may provide guidance and a reference for promoting the sound development of prefabricated construction in China.

  13. Development of a Blueprint Impact System of the risks on construction projects Implementation

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2015-08-01

    Full Text Available In Production and Operations Management the specialists have tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization. The research aims to develop a blue print to analyze the relationship between the impact of risk and stages of implementing of the project and, the effect of risk relationship with the type of contract, and the impact of risks to do with the type of construction works. In this paper a number of risks has been identified that have already occurred from the study of a number of construction projects completed and theoretical studies and interview a number of construction industry experts to determine the extent of the impact of these risks in each of these three axes in construction projects in Iraq for the purpose of responding and management. The study found a set of conclusions such as existing of priority in happiness of risks which proof that there is an relationship between the risks and sort of stage, contract and constructional work. In the light of what has been reached for the purpose of benefiting from the computer automated features a program have been used ( Vanguard Software System to build the decision tree in order to manage the risks according to their priority in happiness.

  14. Advanced mobile satellite communications using COMETS satellite in MM-wave and Ka-band

    Science.gov (United States)

    Ohmori, Shingo; Isobe, Shunkichi; Takeuchi, Makoto; Naito, Hideyuki

    1993-01-01

    Early in the 21st century, the demand for personal communications using mobile, hand-held, and VSAT terminals will rapidly increase. In a future system, many different types of services should be provided with one-hop connection. The Communications Research Laboratory (CRL) has studied a future advanced mobile satellite communications system using millimeter wave and Ka band. In 1990, CRL started the Communications and Broadcasting Engineering Test Satellite (COMETS) project. The satellite has been developed in conjunction with NASDA and will be launched in 1997. This paper describes the COMETS payload configuration and the experimental system for the advanced mobile communications mission.

  15. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  16. Results of expert response when forming an exhaustive list of potential risks of constructions projects using energy efficient technologies

    Directory of Open Access Journals (Sweden)

    Ryzhkova Anastasiya Igorevna

    2016-10-01

    Full Text Available The author deals with the most widely used methods of risk events identification. The expert response method is most applicable for construction projects using energy efficient technologies. The article presents the results of an opinion poll of the professional expert community using expert response method, which is aimed to identify the most likely potential “pure” risk of construction projects with energy-efficient technologies in use. 74 experts representing different levels of the construction process were polled: customers and directors of construction companies, project managers, risk managers, advisors. The answers were collected during private talks and also using a special website Survey Monkey. Experts from different countries took part: Russia, Great Britain, Austria, Luxemburg, Switzerland and Norway. Also the article presents the expert evaluation of the “effect” of risk implementation on the cost of a project, implementation time, the product quality, the environment and safety on the construction site.

  17. Exploring factors affecting owners' trust of contractors in construction projects: a case of China.

    Science.gov (United States)

    Tai, Shuangliang; Sun, Chengshuang; Zhang, Shoujian

    2016-01-01

    It has been found that a low level of trust among members of a construction project team leads to poor performance in China. Many researchers have described the challenges, consequently advocating partnering as an attractive approach for more valuable cooperation. Because substantial investments have been poured into construction projects since the year 2000, trust research will improve the performance of construction projects and will be meaningful to the Chinese construction industry. The purpose of this paper is to investigate the attributes affecting owners' trust of contractors, to understand the potential properties of these factors, and to rank the factors in order of importance. Twenty-four attributes are identified from a literature review. Supported by qualitative reviews, a questionnaire is conducted to obtain relevant data, and 168 valid responses are obtained for data analysis. Principal component analysis (PCA) is employed to find the factor structure of the identified trust attributes. By the method of PCA, the attributes are extracted into eight factors, including interaction history, information sharing and communication, contract and institution, relation-specific investment, reputation, integrity, competence, and opportunistic behaviour. The value and originality of this paper are embodied in using PCA to understand the various attribute groupings and to illuminate trust impact factors in the Chinese context. When they understand the critical factors affecting trust better, owners and contractors can devise more appropriate strategies to improve performance.

  18. Critical Success Factors for Malaysian Construction Projects: An Investigative Review

    Directory of Open Access Journals (Sweden)

    Yee Cheong Yong

    2017-05-01

    Full Text Available Construction projects play an important role in the advancement of a nation through infrastructure development that leads to economic growth. They are planned carefully to accomplish certain goals. However, not all the projects achieved the goals as per planned. Many factors contribute to the successes and failures, and it becomes an interesting arena for research. The primary objective of this paper is to outline the development trend of project success measurement globally and locally. The research method employed was to make selected reviews on critical success factors' (CSFs literature and to compare international standards and progress in incorporating human behavioural aspects of project management to the situation in Malaysia. A somewhat similar pattern can be observed in Malaysia where the studies have departed from the usual criteria of time, cost and quality, to define project success in a more holistic way. However, the domestic industry has failed to respond to the emerging trend globally as there has yet been any widely published research on the importance of human-related factors towards project success. A consolidated framework of CSFs has therefore, been proposed in responding to the findings. This paper fulfils an identified need as there has been a dearth of research on the subject matter locally.

  19. Project and construction of a digital chronoanalyser

    International Nuclear Information System (INIS)

    Cavalcante, M.A.

    1983-01-01

    The project, the construction and the operation tests of a new electronic system for measuring half-lives of nuclear excited states in the range from 10 -7 to 10 -5 seconds are presented. The proposed method uses logic circuits of the TTL family. The time scale is obtained from a phase locked-loop quartz oscillator; the formation instant of excited state of interest is obtained by JK flip-flop through its negative transition edge. This system uses ten channels of frequency counters, controlled by logic gates, to measure successively gamma rays emitted between the instant of birth of an excited state and its de excitation time. The performance of system was verified by gamma ray decay from 137 Cs and 60 Co. (Author) [pt

  20. Perspective on the personal and professional needs of the project leader in construction industry in Libya: a case study

    Directory of Open Access Journals (Sweden)

    Abdul Hamid kadir Pakir

    2010-05-01

    Full Text Available The quality of leadership is one of the most important factors in determining the success and survival of groups and organizations. The purpose of this paper is to examine the leadership needs of the project manger in the Libyan construction companies. The objective was identified the most important and crucial personal and professional needs of the project manager. This study attempted to identify the needs of the project managers in the construction industry in Libya. The finding has shown that all managers surveyed basically agreed that adherence to law/legality, specific, concise and rational, followed by intuitive and open minded are ranked as the most crucial personal needs that should be acquired to become an effective project manager in the construction industry. On the other hand, attention to details, project focus, adherence to construction industries/ professional codes, time concious / constraints, problem solving were ranked as the crucial professional needs that required the respondents.

  1. A novel evaluation method for building construction project based on integrated information entropy with reliability theory.

    Science.gov (United States)

    Bai, Xiao-ping; Zhang, Xi-wei

    2013-01-01

    Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.

  2. Construction and characterization of the detection modules for the Muon Portal Project

    Energy Technology Data Exchange (ETDEWEB)

    Blancato, A.A.; Bonanno, D.L.; La Rocca, P.; Longhitano, F.; Lo Presti, D.; Parasole, O.; Pugliatti, C.; Riggi, F.; Russo, G.V.; Santagati, G. [Dipartimento di Fisica e Astronomia, Universita di Catania and INFN, Catania, (Italy); Bandieramonte, M.; Billotta, S.; Bonanno, G.; Garozzo, S.; Marano, D.; Riggi, S.; Romeo, G. [INAF, Osservatorio Astrofisico di Catania, (Italy); Fallica, P.G.; Romeo, M. [STMicroelectronics, Catania, (Italy)

    2015-07-01

    The Muon Portal Project is a joint initiative between research and industrial partners, aimed at the construction of a real size detector prototype (6 x 3 x 7 m{sup 3}) for the inspection of containers by the muon scattering technique, devised to search for hidden high-Z fissile materials and provide a full 3D tomography of the interior of the container in a scanning time of the order of minutes. The muon tracking detector is based on a set of 48 detection modules (size 1 m x 3 m), each built with 100 extruded scintillator strips, so as to provide four X-Y detection planes, two placed above and two below the container to be inspected. Two wavelength shifting (WLS) fibres embedded in each strip convey the emitted photons to Silicon Photomultipliers (SiPM) which act as photo-sensors. After a research and development phase, which led to the choice and test of the individual components, the construction of the full size detector has already started. The paper describes the results of the mass characterization of the photo-sensors and the construction and test measurements of the first detection modules of the Project. (authors)

  3. The Evolution of Culture-Climate Interplay in Temporary Multi-Organisations: The Case of Construction Alliancing Projects

    OpenAIRE

    Kusuma, I. C.

    2016-01-01

    Organisational culture has been a long-standing debate in management research. However, in the field of construction project management, it is relatively under-explored. This is mainly due to the different organisational context of Temporary Multi-Organisations (TMOs). This research re-explores the notion of organisational culture in construction projects. Based on Darwin’s theory of evolution this research goes back to the very beginning; illustrating the exact meaning and dynamics of organi...

  4. Bidding Strategy to Support Decision-Making Based on Comprehensive Information in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2016-01-01

    Full Text Available This paper develops a unified method to support contractor for bidding selection in construction projects. A cross-functional contractor with 28 candidate units distributed in the three departments (construction units, design units, and suppliers is used as an example. This problem is first formulated as a 0-1 quadratic programming problem through optimizing individual performance and collaborative performance of the candidate units based on individual information and collaborative information. Then, a multiobjective evolutionary algorithm is designed to solve this problem and a bidding selection problem for a major bridge project is used to demonstrate our proposed method. The results show that the decision-maker (DM obtains a better contractor if he pays more attention to collaborative performance.

  5. The Jefferson Lab Quality Assurance Program for the SNS Superconducting Linac Construction Project

    International Nuclear Information System (INIS)

    Joseph Ozelis

    2003-01-01

    As part of a multi-laboratory collaboration, Jefferson Lab is currently engaged in the fabrication, assembly, and testing of 23 cryomodules for the superconducting linac portion of the Spallation Neutron Source (SNS) being built at Oak Ridge National Laboratory. As with any large accelerator construction project, it is vitally important that these components be built in a cost effective and timely manner, and that they meet the stringent performance requirements dictated by the project specifications. A comprehensive Quality Assurance (QA) program designed to help accomplish these goals has been implemented as an inherent component of JLab's SNS construction effort. This QA program encompasses the traditional spectrum of component performance, from incoming parts inspection, raw materials testing, through to sub-assembly and finished article performance evaluation

  6. 42 CFR 137.379 - Do Davis-Bacon wage rates apply to construction projects performed by Self-Governance Tribes...

    Science.gov (United States)

    2010-10-01

    ... projects performed by Self-Governance Tribes using Federal funds? 137.379 Section 137.379 Public Health... HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Other § 137.379 Do Davis-Bacon wage rates apply to construction projects performed by Self-Governance Tribes using Federal funds? Davis-Bacon Act...

  7. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Science.gov (United States)

    2010-10-01

    ... the construction of a rural water supply project under this program? 404.12 Section 404.12 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.12 Can Reclamation provide assistance with the construction of a rural water supply project under this program? Reclamation may provide assistance with the...

  8. Nanosatellite swarm support for larger satellites

    NARCIS (Netherlands)

    Verhoeven, Chris; Engelen, Steven; Noroozi, Arash; Bentum, Marinus Jan; Sundaramoorthy, Prem; Meijer, Robert

    2011-01-01

    Nano-satellites are small (less than 10 kg) and low cost satellites of which quite a number has been launched the last few years, mostly as university educational or research projects. The development of professional scientific and commercial applications is still in its infancy and there are only

  9. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Science.gov (United States)

    2010-10-01

    ... SELF-GOVERNANCE Construction Nepa Process § 137.294 What is the typical IHS environmental review... impact on the environment, and therefore do not require environmental impact statements (EIS). Under current IHS procedures, an environmental review is performed on all construction projects. During the IHS...

  10. A quantitative analysis study on the implementation of partnering in the design and build construction project

    Science.gov (United States)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  11. Defense Infrastructure: DOD Needs Clearer Guidance on Notifying Congress of Privately Financed Construction Projects

    Science.gov (United States)

    2017-01-01

    welfare, and recreation activities such as recreation centers; food , beverage , and entertainment programs; and recreational lodging. Private...fast food restaurants. Because these projects are not authorized and funded through the regular appropriations process for military construction...commissaries.8 These funds can be used for various specified purposes, including the construction of commissaries.9 DOD commissaries are managed by

  12. FOUNDATION OF THE RATIONAL LEVEL OF THE ORGANIZATIONAL AND TECHNOLOGICAL RELIABILITY IN CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    MLODESTKY V. R.

    2015-09-01

    Full Text Available Statement of the problem. The main points of contractual obligations is their timely performance with ensuring the desired level of investments of the investment funds provided for in this contract. The longer the execution of the works under the contract, the higher the probability of violation of these terms. Analysis of construction projects over the past decade has shown that the situation has not changed significantly, according to [8] contemporary data on the construction of a number of objects from which it follows that the larger the object, and accordingly, the longer construction period, the more the actual deviation of the actual terms of the construction of the planned, up to 50...100% in some cases. The comparison of these data shows that the problem of ensuring reliable operation of the construction company on the stage of implementation of a specific project is relevant in the present time. Analysis of recent research. The analysis of researches in the field of the rational justification of organizational and technological reliability values shows that its range is in the range from 0.35 to 0.9, it indicates the absence of a reasoned approach to this issue. Of course, for a more reliable implementation of the plan one needs to have a certain amount of appropriate material and financial resources, but in the management process is another important resource that should be in possession of the subject of management this is information. The purpose and objectives of work. The aim of this work is the study of the rational level of organizational and technological reliability (OTR based on analysis of the need for this information. To achieve the goal of the article were set and solve the following tasks: - to establish the relationship between OTR and the right amount of information; - to determine the influence of the accuracy of determining the current state of the controlled parameter and the level of information; - to justify the

  13. A Novel Evaluation Method for Building Construction Project Based on Integrated Information Entropy with Reliability Theory

    Directory of Open Access Journals (Sweden)

    Xiao-ping Bai

    2013-01-01

    Full Text Available Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.

  14. The Eccentric Satellites Problem: Comparing Milky Way Satellite Orbital Properties to Simulation Results

    Science.gov (United States)

    Haji, Umran; Pryor, Carlton; Applebaum, Elaad; Brooks, Alyson

    2018-01-01

    We compare the orbital properties of the satellite galaxies of the Milky Way to those of satellites found in simulated Milky Way-like systems as a means of testing cosmological simulations of galaxy formation. The particular problem that we are investigating is a discrepancy in the distribution of orbital eccentricities. Previous studies of Milky Way-mass systems analyzed in a semi-analytic ΛCDM cosmological model have found that the satellites tend to have significantly larger fractions of their kinetic energy invested in radial motion with respect to their central galaxy than do the real-world Milky Way satellites. We analyze several high-resolution ("zoom-in") hydrodynamical simulations of Milky Way-mass galaxies and their associated satellite systems to investigate why previous works found Milky Way-like systems to be rare. We find a possible relationship between a quiescent galactic assembly history and a distribution of satellite kinematics resembling that of the Milky Way. This project has been supported by funding from National Science Foundation grant PHY-1560077.

  15. Impact of highway construction on land surface energy balance and local climate derived from LANDSAT satellite data.

    Science.gov (United States)

    Nedbal, Václav; Brom, Jakub

    2018-08-15

    Extensive construction of highways has a major impact on the landscape and its structure. They can also influence local climate and heat fluxes in the surrounding area. After the removal of vegetation due to highway construction, the amount of solar radiation energy used for plant evapotranspiration (latent heat flux) decreases, bringing about an increase in landscape surface temperature, changing the local climate and increasing surface run-off. In this study, we evaluated the impact of the D8 highway construction (Central Bohemia, Czech Republic) on the distribution of solar radiation energy into the various heat fluxes (latent, sensible and ground heat flux) and related surface functional parameters (surface temperature and surface wetness). The aim was to describe the severity of the impact and the distance from the actual highway in which it can be observed. LANDSAT multispectral satellite images and field meteorological measurements were used to calculate surface functional parameters and heat balance before and during the highway construction. Construction of a four-lane highway can influence the heat balance of the landscape surface as far as 90m in the perpendicular direction from the highway axis, i.e. up to 75m perpendicular from its edge. During a summer day, the decrease in evapotranspired water can reach up to 43.7m 3 per highway kilometre. This means a reduced cooling effect, expressed as the decrease in latent heat flux, by an average of 29.7MWh per day per highway kilometre and its surroundings. The loss of the cooling ability of the land surface by evaporation can lead to a rise in surface temperature by as much as 7°C. Thus, the results indicate the impact of extensive line constructions on the local climate. Copyright © 2018 Elsevier B.V. All rights reserved.

  16. Some principles of automated control systems construction with project organizational structure

    OpenAIRE

    Kovalenko, Ihor I.; Puhachenko, Kateryna S.

    2013-01-01

    The main principles of automated control systems construction with project organizational structures have been considered and the process flow sheet  for organizational systems control has been proposed. The architectural elements of the organizational system have been introduced and described. The instrumental tools of the graphodynamic systems theory have been used for the simulation modeling of hierarchical structures.

  17. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  18. Kagawa Satellite “STARS” in Shikoku

    Science.gov (United States)

    Nohmi, Masahiro; Yamamoto, Takeshi; Andatsu, Akira; Takagi, Yohei; Nishikawa, Yusuke; Kaneko, Takashi; Kunitom, Daisuke

    The Space Tethered Autonomous Robotic Satellite (STARS) is being developed in Kagawa University, and it will be launched by the H-IIA rocket by Japan Aerospace Exploration Agency (JAXA) in summer 2008. STARS is the first satellite developed in Shikoku, and its specific characteristics are: (i) mother and daughter satellites, which have basic satellite system respectively, and those are launched at the same time; (ii) large space system more than 5m by extending tether; (iii) robotic system, the daughter satellite controls its arm link and the mother satellite controls tether extension. Development of STARS in Kagawa University demonstrates space technology in local community, which has been considered to be a national project. Also, it promotes popularization, enlightenment, and understanding of space technology in local area of the Kagawa prefecture and around it.

  19. Structuring Requirements in a Multi-Project Environment in the Construction Industry

    DEFF Research Database (Denmark)

    Wörösch, Michael

    2012-01-01

    Being in control of requirements in building projects is vital, since it helps securing the often small profit margins and the reputation of the responsible company. Hence this research aims to introduce requirements management to the construction industry. By means of case study and action...... in this industry, yet, success is here defined as an accomplished and accepted implementation of requirements management processes that are used by the relevant project members in their daily work and where the benefits of implementing requirements management outweighs the cost of invested resources. Furthermore...... it is argued that when running technology development, product development, product platform development, and a portfolio of building projects at the same time the use of requirements management is advantageous and an intelligent way of structuring requirements is needed. This article also demonstrates...

  20. Development of Occupational Safety and Health Requirement Management System (OSHREMS Software Using Adobe Dreamweaver CS5 for Building Construction Project

    Directory of Open Access Journals (Sweden)

    Abas Nor Haslinda

    2017-01-01

    Full Text Available The construction industry sector is considered as being risky with frequent and high accident rate. According to Social Security Organization (SOCSO, the construction accidents has arisen from time to time. Construction Industry Development Board (CIDB has developed the Safety and Health Assessment System in Construction (SHASSIC for evaluating the performance of a contractor in construction project by setting out the safety and health management and practices, however the requirement checklist provided is not comprehensive. Therefore, this study aims to develop a software system for facilitating OSH in building construction project, namely OSH requirements management system (OSHREMS, using Adobe Dreamweaver CS5 and Sublime Text as PHP editor. The results from a preliminary study which was conducted through interviews showed that, the respondents were only implementing the basic requirements that comply with legislations, with the absence of appropriate and specific guideline in ensuring occupational safety and health (OSH at the workplace. The tool will be benefits for contractors and other parties to effectively manage the OSH requirements for their projects based on project details.

  1. Use of Satellite SAR Data for Seismic Risk Management: Results from the Pre-Operational ASI-SIGRIS Project

    Science.gov (United States)

    Salvi, Stefano; Vignoli, Stefano; Zoffoli, Simona; Bosi, Vittorio

    2010-12-01

    The scope of the SIGRIS pilot project is the development of an infrastructure to provide value-added information services for the seismic risk management, assuring a close integration between ground-based and satellite Earth Observation data. The project is presently in the demonstration phase, and various information products are constantly generated and disseminated to the main user, the Italian Civil Protection Department. We show some examples of the products generated during the Crisis management of the 2009 L'Aquila earthquake in Central Italy. We also show an example of products generated for the Knowledge and Prevention service in support of the seismic hazard assessment in the area of the Straits of Messina.

  2. An Overview of the First International Satellite Land Surface Climatology Project (ISLSCP) Field Experiment (FIFE)

    Science.gov (United States)

    Sellers, P. J.; Hall, F. G.; Asrar, G.; Strebel, D. E.; Murphy, R. E.

    1992-11-01

    and atmospheric parameters and satellite overpasses. The resulting data are held in a single integrated data base and continue to be analyzed by the participating scientists and others. The first two sections of this paper recount the history and scientific background leading up to FIFE; the third and fourth sections review the experiment design, the scientific teams and equipment involved, and the actual execution of the experiment; the fifth section provides an overview of the contents of this special issue; the sixth section summarizes the management and resources of the project; and the last section lists the acknowledgments.

  3. Selecting the right collaborative components in a construction project

    DEFF Research Database (Denmark)

    Bohnstedt, Kristian Ditlev; Wandahl, Søren

    2018-01-01

    Regardless of context and scope, collaboration is consistently attributed to be an essential determinant of success in construction projects. Researches have long been concerned with the issue of poor collaboration, but situational determination of collaborative components has been overlooked....... The questionnaire was distributed electronically to 440 respondents; after sorting a total of 288 valid responses were obtained. The result is a set of components in a model of structures of collaboration that facilitates a more efficient and effective situational collaboration (EESC), it is denoted as target areas...... structured in type of contract, party and component....

  4. Planning linear construction projects: automated method for the generation of earthwork activities

    NARCIS (Netherlands)

    Askew, W.H.; Al-Jibouri, Saad H.S.; Mawdesley, M.J.; Patterson, D.E.

    2002-01-01

    Earthworks planning for road construction projects is a complex operation and the planning rules used are usually intuitive and not well defined. An approach to automate the earthworks planning process is described and the basic techniques that are used are outlined. A computer-based system has been

  5. Space industrialization - Education. [via communication satellites

    Science.gov (United States)

    Joels, K. M.

    1978-01-01

    The components of an educational system based on, and perhaps enhanced by, space industrialization communications technology are considered. Satellite technology has introduced a synoptic distribution system for various transmittable educational media. The cost of communications satellite distribution for educational programming has been high. It has, therefore, been proposed to utilize Space Shuttle related technology and Large Space Structures (LSS) to construct a system with a quantum advancement in communication capability and a quantum reduction in user cost. LSS for communications purposes have three basic advantages for both developed and emerging nations, including the ability to distribute signals over wide geographic areas, the reduced cost of satellite communications systems versus installation of land based systems, and the ability of a communication satellite system to create instant educational networks.

  6. 25 CFR 1000.246 - Must an AFA that contains a construction project or activity incorporate provisions of Federal...

    Science.gov (United States)

    2010-04-01

    ... as possible in the construction process. If Tribal construction standards are consistent with or... 25 Indians 2 2010-04-01 2010-04-01 false Must an AFA that contains a construction project or activity incorporate provisions of Federal construction standards? 1000.246 Section 1000.246 Indians OFFICE...

  7. 谈项目施工的前期策划%Discussion on pre planning of project construction

    Institute of Scientific and Technical Information of China (English)

    谷来喜

    2014-01-01

    论述了项目前期策划的重要性,依据项目前期策划的基本原则,对项目策划的组织机构、施工部署、技术、质量、安全管理策划等项目施工前期策划编制的主要内容作了阐述,为项目管理提供参考依据。%This paper discussed the importance of project pre planning, based on the basic principles of project pre planning, elaborated the main contents of project planning organization, construction planning, technology, quality, safety management preparation and project construc-tion pre planning, provide reference basis for project management.

  8. Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability

    Directory of Open Access Journals (Sweden)

    Huiru Zhao

    2015-03-01

    Full Text Available In order to achieve the sustainable development of energy, Ultra High Voltage (UHV power transmission construction projects are being established in China currently. Their high-tech nature, the massive amount of money involved, and the need for multi-agent collaboration as well as complex construction environments bring many challenges and risks. Risk management, therefore, is critical to reduce the risks and realize sustainable development of projects. Unfortunately, many traditional risk assessment methods may not perform well due to the great uncertainty and randomness inherent in UHV power construction projects. This paper, therefore, proposes a risk evaluation index system and a hybrid risk evaluation model to evaluate the risk of UHV projects and find out the key risk factors. This model based on a cloud model and fuzzy comprehensive evaluation (FCE method combines the superiority of the cloud model for reflecting randomness and discreteness with the advantages of the fuzzy comprehensive evaluation method in handling uncertain and vague issues. For the sake of proving our framework, an empirical study of “Zhejiang-Fuzhou” UHV power transmission construction project is presented. As key contributions, we find the risk of this project lies at a “middle” to “high” level and closer to a “middle” level; the “management risk” and “social risk” are identified as the most important risk factors requiring more attention; and some risk control recommendations are proposed. This article demonstrates the value of our approach in risk identification, which seeks to improve the risk control level and the sustainable development of UHV power transmission construction projects.

  9. NASDA'S activities and roles in promoting satellite utilization experiments

    Science.gov (United States)

    Shigeta, Tsutomu; Miyoshi, Takashi

    2004-02-01

    While NASDA has been engaged in the development of new satellite missions and the bus technologies, NASDA explores new and attractive applications by promoting the utilization of satellite missions and strengthening the relationships with external parties. Offering opportunities to external parties for conducting application experiments will bring great chances for them in challenging and experimenting new space-based applications. Consequently, it is expected that the outcomes of the space development are returned to general public, research institutes, industries, and that ideas or requirements for new satellite mission could emerge and be materialized. With these objectives in mind, NASDA is presently planning a new space project that is named "i-Space". The i-Space project aims to contribute to the progressing "IT Revolution" by providing new space communication capabilities and to develop practical applications by collaborating with external parties. This paper introduces the activities and roles of NASDA in promoting satellite utilization experiments, particularly focusing on the i-Space project.

  10. Advanced Communications Technology Satellite (ACTS): Four-Year System Performance

    Science.gov (United States)

    Acosta, Roberto J.; Bauer, Robert; Krawczyk, Richard J.; Reinhart, Richard C.; Zernic, Michael J.; Gargione, Frank

    1999-01-01

    The Advanced Communications Technology Satellite (ACTS) was conceived at the National Aeronautics and Space Administration (NASA) in the late 1970's as a follow-on program to ATS and CTS to continue NASA's long history of satellite communications projects. The ACTS project set the stage for the C-band satellites that started the industry, and later the ACTS project established the use of Ku-band for video distribution and direct-to-home broadcasting. ACTS, launched in September 1993 from the space shuttle, created a revolution in satellite system architecture by using digital communications techniques employing key technologies such as a fast hopping multibeam antenna, an on-board baseband processor, a wide-band microwave switch matrix, adaptive rain fade compensation, and the use of 900 MHz transponders operating at Ka-band frequencies. This paper describes the lessons learned in each of the key ACTS technology areas, as well as in the propagation investigations.

  11. Satellite Cell Self-Renewal.

    Science.gov (United States)

    Giordani, Lorenzo; Parisi, Alice; Le Grand, Fabien

    2018-01-01

    Adult skeletal muscle is endowed with regenerative potential through partially recapitulating the embryonic developmental program. Upon acute injury or in pathological conditions, quiescent muscle-resident stem cells, called satellite cells, become activated and give rise to myogenic progenitors that massively proliferate, differentiate, and fuse to form new myofibers and restore tissue functionality. In addition, a proportion of activated cells returns back to quiescence and replenish the pool of satellite cells in order to maintain the ability of skeletal muscle tissue to repair. Self-renewal is the process by which stem cells divide to make more stem cells to maintain the stem cell population throughout life. This process is controlled by cell-intrinsic transcription factors regulated by cell-extrinsic signals from the niche and the microenvironment. This chapter provides an overview about the general aspects of satellite cell biology and focuses on the cellular and molecular aspects of satellite cell self-renewal. To date, we are still far from understanding how a very small proportion of the satellite cell progeny maintain their stem cell identity when most of their siblings progress through the myogenic program to construct myofibers. © 2018 Elsevier Inc. All rights reserved.

  12. Literature on theory and practice on unethical practices in the construction of projects: A case of an emerging economy

    OpenAIRE

    Chipo Mellania Maseko

    2017-01-01

    The construction of projects is mostly symbolised by the extraordinary levels of unethical practices and this has ruined the image of the industry. The delivery of good quality infrastructure projects in some emerging economies is continuously, disrupted because of unethical practices. This paper was, initiated to identify the most dominant unethical practices in the construction of projects, using most recent and comprehensive literature ranging from 2011 to 2017. Twenty unethical practices ...

  13. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    OpenAIRE

    Gurmu, Argaw Tarekegn; Aibinu, Ajibade Ayodeji; Chan, Toong Khuan

    2016-01-01

    This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry...

  14. Kazakhstan participation in International Experimental Reactor ITER Construction project. Work status and prospects

    International Nuclear Information System (INIS)

    Tazhibayeva, I.L.; Tukhvatullin, Sh.T.; Shestakov, V.P.; Kuznetsov, B.A.

    2002-01-01

    Kazakhstan takes part in ITER project in partnership with Russian Federation since the year of 1994. At present the technical stage of the project is completed and ITER Council should take a decision on the site for international reactor. Four countries such as Canada, Japan, Spain and France have offered their territories for being used as site for launching ITER construction. ITER partners started preparing new international agreement that will cover activities on construction, operation and decommissioning of ITER. It will also include the list of research and experimental work that is conducted in support of ITER project. Kazakhstan has already made an important contribution into technical stage realization of ITER project due to scientific and technical researches conducted by National Nuclear Center, by Institute of Experimental and Theoretical Physics and by JSC 'Ulba Metallurgical plant' ('UMP'). Research activity carried out for the support of ITER project is performed in accordance with the following main trends: Tritium safety (permeability and retentin of hydrogen isotopes during in-pile irradiation in various structural materials, co-deposed layers and protective coatings); Verification of computer codes (LOCA type) loss of coolant accidents modeling in ITER reactor; Investigation of liquid metal blanket of thermonuclear reactor (tritium production in lithium containing eutectics Li17Pb83 and ceramics Li 2 TiO 3 , study of tritium permeability). At present the working group of ITER project participants started introducing proposals for cost distribution and for placing the orders on reactor construction. Further Kazakhstan participation in ITER project may be in manufacturing high-tech parts and assemblies from commercial grades of beryllium. They will be used for armouring the reactor first wall, for its thermal protection and for protection of superconductor's components for magnetic systems that are at JSC U MP'. Scientific and technical support of

  15. Exploring Modular Architecture for Nano Satellite and Opportunity for Developing Countries

    Science.gov (United States)

    Rhaman, M. K.; Monowar, M. I.; Shakil, S. R.; Kafi, A. H.; Antara, R. S. I.

    2015-01-01

    SPACE Technology has the potential to provide information, infrastructure and inspiration that meets national needs in developing countries like Bangladesh. Many countries recognize this; in response they are investing in new national satellite programs to harness satellite services. Technology related to space is one example of a tool that can contribute to development both by addressing societal challenges and by advancing a nation's technological capability. To cope up with the advanced world in space technology Bangladesh seems to be highly potential country for satellite, Robotics, embedded systems and renewable energy research. BRAC University, Bangladesh is planning to launch a nano satellite with the collaboration of KIT, Japan. The proposed nano satellite project mission is to experiment about social, commercial and agricultural survey needs in Bangladesh. Each of the proposed applications of the project will improve the lives of millions of people of Bangladesh and it will be a pathfinder mission for the people of this country. Another intention of this project is to create a cheap satellite based remote sensing for developing countries as the idea of large space systems is very costly for us therefore we have decided to make a Nano-satellite.

  16. Exploring Modular Architecture for Nano Satellite and Opportunity for Developing Countries

    International Nuclear Information System (INIS)

    Rhaman, M K; Monowar, M I; Shakil, S R; Kafi, A H; Antara, R S I

    2015-01-01

    SPACE Technology has the potential to provide information, infrastructure and inspiration that meets national needs in developing countries like Bangladesh. Many countries recognize this; in response they are investing in new national satellite programs to harness satellite services. Technology related to space is one example of a tool that can contribute to development both by addressing societal challenges and by advancing a nation's technological capability. To cope up with the advanced world in space technology Bangladesh seems to be highly potential country for satellite, Robotics, embedded systems and renewable energy research. BRAC University, Bangladesh is planning to launch a nano satellite with the collaboration of KIT, Japan. The proposed nano satellite project mission is to experiment about social, commercial and agricultural survey needs in Bangladesh. Each of the proposed applications of the project will improve the lives of millions of people of Bangladesh and it will be a pathfinder mission for the people of this country. Another intention of this project is to create a cheap satellite based remote sensing for developing countries as the idea of large space systems is very costly for us therefore we have decided to make a Nano-satellite

  17. Reduced analysis and confirmatory research on co-adaptability theoretical solution to conflicting events in construction engineering projects

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    The co-adaptability theoretical solution to conflicting events in construction engineering projects has three problems. First, the transformation of constraint conditions of theoretical solution is very difficult in practical engineering applications; second, some coefficients are difficult to be determined; third, there are overfull circular arithmetic operations involved in it. To resolve these problems, a new method to reduce the theoretical solution complications is proposed. By analyzing the operating mechanism of theoretical solution model, redundancies in the theoretical solution can be eliminated, and the ISM mapping with the co-adaptability solution can be set up. Based on this approach, a procedure to solve practical conflicting events in construction projects is established by replacing characteristic variables with mathematic variables. The research results show that the procedure can replace the co-adaptability theoretical solution effectively and solve practical conflicting events in construction projects.

  18. Bringing satellite winds to hub-height

    DEFF Research Database (Denmark)

    Badger, Merete; Pena Diaz, Alfredo; Bredesen, Rolv Erlend

    2012-01-01

    Satellite observations of the ocean surface can provide detailed information about the spatial wind variability over large areas. This is very valuable for the mapping of wind resources offshore where other measurements are costly and sparse. Satellite sensors operating at microwave frequencies...... measure the amount of radar backscatter from the sea surface, which is a function of the instant wind speed, wind direction, and satellite viewing geometry. A major limitation related to wind retrievals from satellite observations is that existing empirical model functions relate the radar backscatter...... to wind speed at the height 10 m only. The extrapolation of satellite wind fields to higher heights, which are more relevant for wind energy, remains a challenge which cannot be addressed by means of satellite data alone. As part of the EU-NORSEWInD project (2008-12), a hybrid method has been developed...

  19. Effectiveness of innovation leadership styles: a manager's influence on ecological innovation in construction projects

    OpenAIRE

    Bossink, B.A.G.

    2004-01-01

    This article presents four basic innovation leadership styles: charismatic, instrumental, strategic and interactive innovation leadership. The leadership styles and their characteristics relate to process and product innovations in construction projects. A theoretical framework - which synthesizes these relations enables explorative research into the effects of leadership on organizational innovativeness. Four case studies, observing the same manager in four comparable projects, explore the e...

  20. Delineating Supply Chain Management (SCM Features in Construction Project Delivery: The Nigerian Case

    Directory of Open Access Journals (Sweden)

    Benedict Amade

    2017-04-01

    Full Text Available This study sought to delineate SCM features using the analytical hierarchy process (AHP with a view to incorporating it into the delivery of construction projects in Nigeria. The study adopted an exploratory research design (quantitative and qualitative methods. A purposive and convenient sampling technique was deployed with the aid of semi-structured interview, case study; questionnaire survey in a construction firm in Port-Harcourt, Rivers State, Nigeria. Questionnaires were used to collect primary data after being pre-tested via a pilot study for validity and reliability. The data collected were analysed using the AHP. Findings from the study shows that the following features are key; Instituting trust and long term relationships amongst supply chain partners (ITP, supply chain finance (SCF, supply chain and continuous performance measurement (SCCPM, information technology (IT, quality management (QM, supply base management (SBM, senior management’s commitment (SMC and supply chain orientation (SCO. In delivering construction projects to success using the SCM approach, adequate attention and emphasis should be accorded to the aforementioned important features in the order they appear as they would aid in effecting the much needed success. It is also expected that the features would further be beneficial to construction firms as it would enable the firms to manage, measure and evaluate the gains ensuing from the deployment of SCM techniques.

  1. Development of econometric models for cost and time over-runs: an empirical study of major road construction projects in pakistan

    International Nuclear Information System (INIS)

    Khan, A.; Chaudhary, M.A.

    2016-01-01

    The construction industry is flourishing worldwide and contributes about 10% to the GDP of the world i.e. up to the tune of 4.6 Trillion US dollars. It employs almost 7% of the total employee dpersons and, consumes around 40% of the total energy. The Pakistani construction sector has displayed impressive growth in recent past years. The efficient road network is a key part of construction business and plays a significant role in the economic uplift of country. The overruns in costs and delays in completion of projects are very common phenomena and it has also been observed that the projects involving construction of roads also face problems of delays and cost over runs especially in developing countries. The causes of cost overruns and delays in road projects being undertaken by the premier road construction organization of Pakistan National Highway Authority (NHA) have been considered in this study. It has been done specifically in the context of impact of cause(s) determined from project report of a total of one hundred and thirty one (131) projects. The ten causative factors which we recognize as Design, Planning and Scheduling Related problems, Financial Constraint Related reasons, Social Problem Related reasons, Technical Reasons, Administrative Reasons, Scope Increase, Specification Changes, Cost Escalation Related reasons, Non-Availability of Equipment or Material and Force Majeure play a commanding role in determination of the cost and time over runs. It has also been observed that among these identified causes, the factors of Administrative Reason, Design, Planning and Scheduling Related, Technical Reasons and Force Majeure are the most significant reasons in cost and time overruns. Whereas, the Cost Escalation related reasons has the least impact on cost increase and delays. The NHA possesses a financial worth of around Rs. 36 billion and with an annual turn over amounting to Rs. 22 billion is responsible to perform road construction project in entire

  2. DebriSat - A Planned Laboratory-Based Satellite Impact Experiment for Breakup Fragment Characterizations

    Science.gov (United States)

    Liou, Jer-Chyi; Clark, S.; Fitz-Coy, N.; Huynh, T.; Opiela, J.; Polk, M.; Roebuck, B.; Rushing, R.; Sorge, M.; Werremeyer, M.

    2013-01-01

    The goal of the DebriSat project is to characterize fragments generated by a hypervelocity collision involving a modern satellite in low Earth orbit (LEO). The DebriSat project will update and expand upon the information obtained in the 1992 Satellite Orbital Debris Characterization Impact Test (SOCIT), which characterized the breakup of a 1960 s US Navy Transit satellite. There are three phases to this project: the design and fabrication of DebriSat - an engineering model representing a modern, 60-cm/50-kg class LEO satellite; conduction of a laboratory-based hypervelocity impact to catastrophically break up the satellite; and characterization of the properties of breakup fragments down to 2 mm in size. The data obtained, including fragment size, area-to-mass ratio, density, shape, material composition, optical properties, and radar cross-section distributions, will be used to supplement the DoD s and NASA s satellite breakup models to better describe the breakup outcome of a modern satellite.

  3. Hydroelectric construction project on the Sheldrake River at Riviere-au-Tonnerre : public inquiry report

    International Nuclear Information System (INIS)

    2009-09-01

    The Societe d'Energie Riviere Sheldrake Inc. has proposed the construction of a hydroelectric facility on the Sheldrake River at Riviere-au-Tonnerre in the regional municipality of Minganie in Quebec. The project involves the construction of a headrace canal, intake, tunnel, powerhouse, access roads, electrical transmission line, spillway, weir and a bridge over the Sheldrake River. The proposed development was subject to an environmental evaluation process and public consultation. Quebec's environmental public hearing board held a public hearing on the draft development of the project to hear the concerns and views of the public and stakeholders. The hearing focused on a number issues, such as reasons for the project, its location and socio-economic impacts. The cumulative environmental effects of the project were also examined. The primary concerns were the economic repercussions of the project and its effect on tourism and fish, including salmon. The Board determined that the project would create jobs in a region affected by unemployment and the decay of its municipalities and that it would stimulate the local and regional economy. However, the Board determined that changes to the project are required to minimize impacts on the natural environment. The project proponent must monitor instream flows to ensure that fish passage facilities meet regulations. In addition, since the proposed project crosses 3 bogs, the developer must compensate for lost wetlands. A 10-year follow-up is required to assess the recovery of these environments. The developer must also maintain the aesthetic quality of the Courbe du Sault Falls in order to maintain the eco-tourism in the region. refs., figs.

  4. Evaluation of satellite technology for pipeline route surveillance and the prevention of third party interference damage

    Energy Technology Data Exchange (ETDEWEB)

    Palmer-Jones, Roland; Hopkins, Phil [Penspen Integrity, Newcastle upon Tyne (United Kingdom)]. E-mail: r.palmer-jones@penspen.com; p.hopkins@penspen.com; Fraser, Andy [Integrated Statistical Solutions (United States)]. E-mail: andy@issquared.co.uk; Dezobry, Jerome [Gas de France, Paris (France)]. E-mail: jerome.dezobry@gazdefrance.com; Merrienboer, Hugo Van [Gasunie, Groningen (Netherlands)]. E-mail: H.A.M.van.Merrienboer@gasunie.nl

    2003-07-01

    The damage caused by Third Party Interference (TPI) is one of the major causes of pipeline failures. Consequently, new technologies for identifying activities that may cause damage to our pipelines are constantly being developed. A recently completed project sponsored by a number of pipeline operators has investigated the use of high-resolution satellites for the integrity management of onshore transmission pipelines. The sponsors were BG Technology (on behalf of Transco), Dansk Olie NatureGas, Gasunie, BP, Gaz de France, Distrigas, and the Health and Safety Executive. The project started with a general review of the satellite technologies available and their potential. The study was then focussed on the identification of activities that might result in damage to the pipeline and the potential of high-resolution optical satellites in identifying hazardous activities. A key element of the study was a comparison with existing surveillance systems, which generally involve regular aerial patrols of the pipeline route. To achieve this a survey was carried out to try and evaluate the costs and benefits of existing systems. In addition a simple model for analysing the cost benefit of pipeline surveillance was constructed, and a functional specification for a surveillance system drafted. Finally the performance of the IKONOS 2 high-resolution satellite system was tested in a controlled experiment using targets placed along a pipeline route. The results of this test were compared with a similar test of helicopter-based surveillance carried out by one of the sponsors. (author)

  5. Research and Practice of Uav Remote Sensing in the Monitoring and Management of Construction Projects in Riparian Areas

    Science.gov (United States)

    Yu, J.; Gan, Z.; Zhong, L.; Deng, L.

    2018-04-01

    The objective of this paper is to investigate the use of UAV remote sensing in the monitoring and management of construction projects in riparian areas through the case study of embankment construction projects' monitoring in the Three Gorges Reservoir area. A three-step approach is proposed to address the problem: data acquisition with UAV, data processing, and monitoring information extraction. The results of the case study demonstrate that UAV remote sensing is capable of providing fast and accurate measurements and calculations for the needs of monitoring of riparian constructions.

  6. Linking satellite ICT application businesses with regional innovation centers and investors: The EC “INVESaT” project

    Science.gov (United States)

    Ghiron, Florence; Kreisel, Joerg

    2009-09-01

    In the sector of information and communication technologies (ICT), whether in the USA, Japan, or Europe, innovative services are already in use, based on large-scale space-based infrastructure investments. Such systems are e.g. earth observation, telecommunication, and navigation, timing and positioning satellites. In combination with the advent of powerful handheld terminals and the demand for ubiquitous services, it is expected that info-mobility applications will reveal new sources of business in the years ahead, using in particular the Earth observation and future GALILEO systems to position any feature or user anywhere in the world within a few meter accuracy. Hence, satellite-based capabilities provide new and unique opportunities for economic stimulation and development. Many incubators and innovation centers in Europe have already grasped this growth potential. Yet, for many European players business growth appears below expectations compared to developments in the USA following the launch of GPS (Global Positioning System). Europe still has to overcome intrinsic barriers to seize these new business opportunities faster and with more visible economic impact by leveraging on SMEs and regional innovation centers to expand the commercial utilization of satellite capabilities and mobilization of appropriate financial resources. The paper elaborates on the INVESat project (funded by the EuropeInnova—European Commission), which aims at bridging the gap between Innovative enterprises and financial In VEstors in the emerging markets of SaTellite applications. The critical success factors required to stimulate and support more efficiently investments in this bread of innovative services will also be highlighted.

  7. Cultures in orbit: Satellite technologies, global media and local practice

    Science.gov (United States)

    Parks, Lisa Ann

    Since the launch of Sputnik in 1957, satellite technologies have had a profound impact upon cultures around the world. "Cultures in Orbit" examines these seemingly disembodied, distant relay machines in relation to situated social and cultural processes on earth. Drawing upon a range of materials including NASA and UNESCO documents, international satellite television broadcasts, satellite 'development' projects, documentary and science fiction films, remote sensing images, broadcast news footage, World Wide Web sites, and popular press articles I delineate and analyze a series of satellite mediascapes. "Cultures in Orbit" analyzes uses of satellites for live television relay, surveillance, archaeology and astronomy. The project examines such satellite media as the first live global satellite television program Our World, Elvis' Aloha from Hawaii concert, Aboriginal Australian satellite programs, and Star TV's Asian music videos. In addition, the project explores reconnaissance images of mass graves in Bosnia, archaeological satellite maps of Cleopatra's underwater palace in Egypt, and Hubble Space Telescope images. These case studies are linked by a theoretical discussion of the satellite's involvement in shifting definitions of time, space, vision, knowledge and history. The satellite fosters an aesthetic of global realism predicated on instantaneous transnational connections. It reorders linear chronologies by revealing traces of the ancient past on the earth's surface and by searching in deep space for the "edge of time." On earth, the satellite is used to modernize and develop "primitive" societies. Satellites have produced new electronic spaces of international exchange, but they also generate strategic maps that advance Western political and cultural hegemony. By technologizing human vision, the satellite also extends the epistemologies of the visible, the historical and the real. It allows us to see artifacts and activities on earth from new vantage points

  8. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    Science.gov (United States)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  9. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projects the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.

  10. The use of Game Theory to solve conflicts in the project management and construction industry

    Directory of Open Access Journals (Sweden)

    José Ramón San Cristóbal

    2015-01-01

    Full Text Available A typical construction project involves a wide range of disparate professionals, in many cases geographically distributed, working together for a relatively short period of time on the design and construction of a facility. Since organizations are becoming flatter, culturally rich, geographically diverse and intensely competitive, the possibilities for conflict in such environments are greater. Negotiation is an important aspect of a project and plays an important role in resolving claims, preventing disputes, and keeping a harmonious relationship between project participants. Part of any project manager’s role as a leader is to recognize conflict, understand the sources of conflict and manage it, and to do this a project manager must be able to understand the basics of negotiation theory and have sufficient competencies to lead in such situations. To address the complex technical and human issues in negotiation, different negotiation theories and models are available which mainly include game theory, economic theory, and behavior theory. Since Game Theory provides, by its very nature, the appropriate tools for the analysis and eventual solution of conflicts of any kind, this paper uses a model based on Game Theory in order to identify the activities that are responsible for the delays in a project and divide the costs among them.

  11. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  12. Construction of spaces of kinematic quantum states for field theories via projective techniques

    International Nuclear Information System (INIS)

    Okołów, Andrzej

    2013-01-01

    We present a method of constructing a space of quantum states for a field theory: given phase space of a theory, we define a family of physical systems each possessing a finite number of degrees of freedom, next we define a space of quantum states for each finite system, finally using projective techniques we organize all these spaces into a space of quantum states which corresponds to the original phase space. This construction is kinematic in this sense that it bases merely on the structure of the phase space of a theory and does not take into account possible constraints on the space. The construction is a generalization of a construction by Kijowski—the latter one is limited to theories of linear phase spaces, while the former one is free of this limitation. The method presented in this paper enables to construct a space of quantum states for the teleparallel equivalent of general relativity. (paper)

  13. Northern Everglades, Florida, satellite image map

    Science.gov (United States)

    Thomas, Jean-Claude; Jones, John W.

    2002-01-01

    These satellite image maps are one product of the USGS Land Characteristics from Remote Sensing project, funded through the USGS Place-Based Studies Program with support from the Everglades National Park. The objective of this project is to develop and apply innovative remote sensing and geographic information system techniques to map the distribution of vegetation, vegetation characteristics, and related hydrologic variables through space and over time. The mapping and description of vegetation characteristics and their variations are necessary to accurately simulate surface hydrology and other surface processes in South Florida and to monitor land surface changes. As part of this research, data from many airborne and satellite imaging systems have been georeferenced and processed to facilitate data fusion and analysis. These image maps were created using image fusion techniques developed as part of this project.

  14. Comparing offshore wind farm wake observed from satellite SAR and wake model results

    Science.gov (United States)

    Bay Hasager, Charlotte

    2014-05-01

    Offshore winds can be observed from satellite synthetic aperture radar (SAR). In the FP7 EERA DTOC project, the European Energy Research Alliance project on Design Tools for Offshore Wind Farm Clusters, there is focus on mid- to far-field wind farm wakes. The more wind farms are constructed nearby other wind farms, the more is the potential loss in annual energy production in all neighboring wind farms due to wind farm cluster effects. It is of course dependent upon the prevailing wind directions and wind speed levels, the distance between the wind farms, the wind turbine sizes and spacing. Some knowledge is available within wind farm arrays and in the near-field from various investigations. There are 58 offshore wind farms in the Northern European seas grid connected and in operation. Several of those are spaced near each other. There are several twin wind farms in operation including Nysted-1 and Rødsand-2 in the Baltic Sea, and Horns Rev 1 and Horns Rev 2, Egmond aan Zee and Prinses Amalia, and Thompton 1 and Thompton 2 all in the North Sea. There are ambitious plans of constructing numerous wind farms - great clusters of offshore wind farms. Current investigation of offshore wind farms includes mapping from high-resolution satellite SAR of several of the offshore wind farms in operation in the North Sea. Around 20 images with wind farm wake cases have been retrieved and processed. The data are from the Canadian RADARSAT-1/-2 satellites. These observe in microwave C-band and have been used for ocean surface wind retrieval during several years. The satellite wind maps are valid at 10 m above sea level. The wakes are identified in the raw images as darker areas downwind of the wind farms. In the SAR-based wind maps the wake deficit is found as areas of lower winds downwind of the wind farms compared to parallel undisturbed flow in the flow direction. The wind direction is clearly visible from lee effects and wind streaks in the images. The wind farm wake cases

  15. Impact of highway construction on water bodies: a geospatial assessment.

    Science.gov (United States)

    Vijay, Ritesh; Kushwaha, Vikash K; Mardikar, Trupti; Labhasetwar, P K

    2017-08-01

    India has witnessed a massive infrastructure boom in the past few years. One of such projects is National Highway-7 (NH-7), a North-South highway connecting Kanyakumari, Tamil Nadu, to Varanasi, Uttar Pradesh, traversing many water bodies. The present study aims to assess the pre- and post-construction impact due to existing, new and widened NH-7 on the physical status of the water bodies, using remote sensing techniques. Satellite images spanning 22 years were procured and analysed for change detection in land use and land cover within the waterbodies. The study indicates that construction activities have led to transformation within the water bodies regarding reduction in area and inter-changing of land use and land cover classes, in turn leading to siltation and reduction of recharge.

  16. The AAU-cubesat Student Satellite Project: Architectual Overview and Lessons Learnt

    DEFF Research Database (Denmark)

    Østergaard, Kasper Zinck; Alminde, Lars; Bisgaard, Morten

    2004-01-01

    the cubesat concept that prescribes a satellite with dimensions 10x10x10cm and mass one kilogram. This paper will describe the overall architecture of the AAU-cubesat in order to show what a pico-satellite can be and demonstrate all the fields of engineering which must come together to built a student...

  17. Knowledge sharing in construction partnering projects - redundancy, boundary objects and brokers

    DEFF Research Database (Denmark)

    Koch, Christian; Thuesen, Christian

    2013-01-01

    is on two dialogue excerpts, one on process, and one on product knowledge exchanges. The diversity and disjunctive feature of the practices form a condition of possibility for knowledge handling and synthesis into the built construct. Relation-based interaction is necessary with boundary objects and brokers......This article adopts practice-based theory for understanding inter-organisational knowledge work and extends it with a discussion of the role of redundancy. In this view, a constellation of firms is a multiple configuration of communities of practices, characterised by overlapping practises......, multiple memberships and different levels of participation, and accompanied by a governance frame. The paper discusses central mechanisms for coordinating knowledge in such a complex construction project. The knowledge relations are conceptualised through focusing on redundancy, understood as negotiated...

  18. Literature on theory and practice on unethical practices in the construction of projects: A case of an emerging economy

    Directory of Open Access Journals (Sweden)

    Chipo Mellania Maseko

    2017-12-01

    Full Text Available The construction of projects is mostly symbolised by the extraordinary levels of unethical practices and this has ruined the image of the industry. The delivery of good quality infrastructure projects in some emerging economies is continuously, disrupted because of unethical practices. This paper was, initiated to identify the most dominant unethical practices in the construction of projects, using most recent and comprehensive literature ranging from 2011 to 2017. Twenty unethical practices in the construction of projects were, identified. From this, the study observed that the most dominant unethical practices are corruption, bribery and collusive tendering. The least unethical practices revealed by this study are the lack of safety, overstatement of capacity and falsification of experience. Findings indicate that in order to redesign the future landscape of the industry, there is need to educate the workforce on the effects of unethical practices as well as the need to implement stronger policies. Based on these findings, further empirical studies are necessary. This article also presents recent challenges and trends of unethical behaviour that needs acknowledgement in order to assist the construction industry. In conclusion, this study proposes twelve possible solutions that could assist the construction community in the reduction of unethical practices

  19. Communication schemes for olfar's inter-satellite links

    NARCIS (Netherlands)

    Budianu, A.; Willink-Castro, T.J.; Meijerink, Arjan; Bentum, Marinus Jan

    2012-01-01

    The Orbiting Low Frequency Array for Radio astronomy(OLFAR) project is aimed at developing a radio telescope in space sensitive for the 0.3–30 MHz range by using a swarm of more than 50 identical nano-satellites. The satellites will form a very large aperture, capable of capturing very weak

  20. Data distribution in the OLFAR satellite swarm

    NARCIS (Netherlands)

    Budianu, A.; Willink-Castro, T.J.; Engelen, S.; Rajan, R.T.; Rajan, Raj; Smith, D.M.P.; Meijerink, Arjan; Bentum, Marinus Jan

    2013-01-01

    The Orbiting Low Frequency Antennas for Radio Astronomy (OLFAR) project aims to develop a radio telescope for very low frequencies (below 30 MHz) by using a swarm of 50 or more nano-satellites. Spread in a 100-km diameter cloud, the satellites will form a very large aperture capable of sensing the

  1. Management and integration of engineering and construction activities: Lessons learned from the AP1000R nuclear power plant China project

    International Nuclear Information System (INIS)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-01-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  2. Assessing the influence of project management on quality during the early phases of construction projects

    Directory of Open Access Journals (Sweden)

    Ljevo Žanesa

    2018-12-01

    Full Text Available Although the quality of a process affects the quality of the end product, there is currently an insignif­icant amount of knowledge about the quality of project management (PM processes that directly affect the quality of the delivered product (constructed building. This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the con­structed building. The quality of the PM process is rep­resented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project partici­pants (with different managerial perspectives in terms of the indicators of quality of the delivered product. All par­ticipants, regardless of managerial perspective, believe that the most important indicator of the quality of prod­ucts for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046% of the basic set of vari­ables.

  3. Simulating The Impact Of The Material Flow In The Jordanian Construction Supply Chain And Its Impact On Project Performance

    Directory of Open Access Journals (Sweden)

    Dr. Ghaith Al-Werikat

    2017-03-01

    Full Text Available With the new developments and challenges within the construction industry improving the construction supply chain is becoming a major concern to both governments and industries. Improving the construction supply chain helps in improving the quality of construction projects reducing cost wastes delays and other disruptions. This paper discusses the analysis of material flow in the construction supply chain. The methodology consisted of preliminary investigations survey and simulation development to analyse the extent of impact that material flow has on construction projects in Jordan. Both the main survey and the investigations revealed that material flow delays are caused mainly by 3 types of delays late delivery wrong specification and material damaged on site. The highest impact regarding late deliveries was scaffolding with a 16 probability of occurrence a 2-day delay on the activitys duration. Concrete ranked highest regarding wrong specification with a 19 probability of occurrence an 8-day delay the activitys duration. Regarding materials damaged on site bricks ranked highest with a 9 probability of occurrence a 3-day delay on the duration. The simulation results exhibited a delay of 50 on the projects duration and a probability of a delay occurring is 9.2.

  4. Evaluation of tile layer productivity in construction project

    Science.gov (United States)

    Aziz, Hamidi Abdul; Hassan, Siti Hafizan; Rosly, Noorsyalili; Ul-Saufie, Ahmad Zia

    2017-10-01

    Construction is a key sector of the national economy for countries all over the world. Until today, construction industries are still facing lots of problems concerning the low productivity, poor safety and insufficient quality. Labour productivity is one of the factors that will give impact to the quality of projects. This study is focusing on evaluating the tile layer productivity in the area of Seberang Perai, Penang. The objective of this study is to determine the relationship of age and experience of tile layers with their productivity and to evaluate the effect of nationality to tile layers productivity. Interview and site observation of tile layers has been conducted to obtain the data of age, experience and nationality of tile layers. Site observation is made to obtain the number of tiles installed for every tile layer for the duration of 1 hour, and the data were analysed by using Statistical Package for Social Science (IBM SPSS Statistic 23) software. As a result, there is a moderate linear relationship between age and experience of tile layers with their productivity. The age of 30 and the experience of 4 years give the highest productivity. It also can be concluded that the tile layers from Indonesia tend to have higher productivity compared to tile layers from Myanmar.

  5. Solar satellites

    Energy Technology Data Exchange (ETDEWEB)

    Poher, C.

    1982-01-01

    A reference system design, projected costs, and the functional concepts of a satellite solar power system (SSPS) for converting sunlight falling on solar panels of a satellite in GEO to a multi-GW beam which could be received by a rectenna on earth are outlined. Electricity transmission by microwaves has been demonstrated, and a reference design system for supplying 5 GW dc to earth was devised. The system will use either monocrystalline Si or concentrator GaAs solar cells for energy collection in GEO. Development is still needed to improve the lifespan of the cells. Currently, the cell performance degrades 50 percent in efficiency after 7-8 yr in space. Each SSPS satellite would weigh either 34,000 tons (Si) or 51,000 tons (GaAs), thereby requiring the fabrication of a heavy lift launch vehicle or a single-stage-to-orbit transport in order to minimize launch costs. Costs for the solar panels have been estimated at $500/kW using the GaAs technology, with transport costs for materials to GEO being $40/kg.

  6. Solar satellites

    Science.gov (United States)

    Poher, C.

    A reference system design, projected costs, and the functional concepts of a satellite solar power system (SSPS) for converting sunlight falling on solar panels of a satellite in GEO to a multi-GW beam which could be received by a rectenna on earth are outlined. Electricity transmission by microwaves has been demonstrated, and a reference design system for supplying 5 GW dc to earth was devised. The system will use either monocrystalline Si or concentrator GaAs solar cells for energy collection in GEO. Development is still needed to improve the lifespan of the cells. Currently, the cell performance degrades 50 percent in efficiency after 7-8 yr in space. Each SSPS satellite would weigh either 34,000 tons (Si) or 51,000 tons (GaAs), thereby requiring the fabrication of a heavy lift launch vehicle or a single-stage-to-orbit transport in order to minimize launch costs. Costs for the solar panels have been estimated at $500/kW using the GaAs technology, with transport costs for materials to GEO being $40/kg.

  7. Investigating the multi-causal and complex nature of the accident causal influence of construction project features.

    Science.gov (United States)

    Manu, Patrick A; Ankrah, Nii A; Proverbs, David G; Suresh, Subashini

    2012-09-01

    Construction project features (CPFs) are organisational, physical and operational attributes that characterise construction projects. Although previous studies have examined the accident causal influence of CPFs, the multi-causal attribute of this causal phenomenon still remain elusive and thus requires further investigation. Aiming to shed light on this facet of the accident causal phenomenon of CPFs, this study examines relevant literature and crystallises the attained insight of the multi-causal attribute by a graphical model which is subsequently operationalised by a derived mathematical risk expression that offers a systematic approach for evaluating the potential of CPFs to cause harm and consequently their health and safety (H&S) risk implications. The graphical model and the risk expression put forth by the study thus advance current understanding of the accident causal phenomenon of CPFs and they present an opportunity for project participants to manage the H&S risk associated with CPFs from the early stages of project procurement. Copyright © 2011 Elsevier Ltd. All rights reserved.

  8. TechEdSat Nano-Satellite Series Fact Sheet

    Science.gov (United States)

    Murbach, Marcus; Martinez, Andres; Guarneros Luna, Ali

    2014-01-01

    TechEdSat-3p is the second generation in the TechEdSat-X series. The TechEdSat Series uses the CubeSat standards established by the California Polytechnic State University Cal Poly), San Luis Obispo. With typical blocks being constructed from 1-unit (1U 10x10x10 cm) increments, the TechEdSat-3p has a 3U volume with a 30 cm length. The project uniquely pairs advanced university students with NASA researchers in a rapid design-to-flight experience lasting 1-2 semesters.The TechEdSat Nano-Satellite Series provides a rapid platform for testing technologies for future NASA Earth and planetary missions, as well as providing students with an early exposure to flight hardware development and management.

  9. IInvestigations of space-time variability of the sea level in the Barents Sea and the White Sea by satellite altimetry data and results of hydrodynamic modelling

    Science.gov (United States)

    Lebedev, S. A.; Zilberstein, O. I.; Popov, S. K.; Tikhonova, O. V.

    2003-04-01

    The problem of retrieving of the sea level anomalies in the Barents and White Seas from satellite can be considered as two different problems. The first one is to calculate the anomalies of sea level along the trek taking into account all amendments including tidal heights. The second one is to obtain of fields of the sea level anomalies on the grid over one cycle of the exact repeat altimetry mission. Experience results show that there is preferable to use the regional tidal model for calculating tidal heights. To construct of the anomalies fields of the sea level during the exact repeat mission (cycle 35 days for ERS-1 and ERS-2), when a density of the coverage of the area of water of the Barents and White Seas by satellite measurements achieves maximum. It is necessary to solve the problem of the error minimum. This error is based by the temporal difference of the measurements over one cycle and by the specific of the hydrodynamic regime of the both seas (tidal, storm surge variations, tidal currents). To solve this problem it is assumed to use the results of the hydrodynamic modeling. The error minimum is preformed by the regression of the model results and satellite measurements. As a version it is considered the possibility of the utilizing of the neuronet obtained by the model results to construct maps of the sea level anomalies. The comparison of the model results and the calculation of the satellite altimetry variability of the sea level of Barents and White Seas shows a good coincidence between them. The satellite altimetry data of ERS-1/2 and TOPEX/POSEIDON of Ocean Altimeter Pathfinder Project (NASA/GSFC) has been used in this study. Results of the regional tidal model computations and three dimensional baroclinic model created in the Hydrometeocenter have been used as well. This study also exploited the atmosphere date of the Project REANALYSIS. The research was undertaken with partial support from the Russian Basic Research Foundation (Project No. 01-07-90106).

  10. Texas Telecommunication Satellite Demonstration Project. Planning Effort for Application of Communication Satellites in Education.

    Science.gov (United States)

    Education Service Center Region 4, Houston, TX.

    The primary goal of the Texas Telecommunication Satellite Demonstration consortium is to install, operate, and evaluate a comprehensive communication service delivery system which would provide the citizens of Texas with greater opportunity for equal access to education and information. The four major objectives of the demonstration are (1) to…

  11. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  12. ANFIS multi criteria decision making for overseas construction projects: a methodology

    Science.gov (United States)

    Utama, W. P.; Chan, A. P. C.; Zulherman; Zahoor, H.; Gao, R.; Jumas, D. Y.

    2018-02-01

    A critical part when a company targeting a foreign market is how to make a better decision in connection with potential project selection. Since different attributes of information are often incomplete, imprecise and ill-defined in overseas projects selection, the process of decision making by relying on the experiences and intuition is a risky attitude. This paper aims to demonstrate a decision support method in deciding overseas construction projects (OCPs). An Adaptive Neuro-Fuzzy Inference System (ANFIS), the amalgamation of Neural Network and Fuzzy Theory, was used as decision support tool to decide to go or not go on OCPs. Root mean square error (RMSE) and coefficient of correlation (R) were employed to identify the ANFIS system indicating an optimum and efficient result. The optimum result was obtained from ANFIS network with two input membership functions, Gaussian membership function (gaussmf) and hybrid optimization method. The result shows that ANFIS may help the decision-making process for go/not go decision in OCPs.

  13. An Appraisal of Project Procurement Methods in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Ujaddughe I.C.

    2010-01-01

    Full Text Available The aim of every client at the beginning of any project is to have at the end of the day a quality structure delivered on time and within budget. However, researches have shown that in most cases this aim is not met. The aim of the study that formed the basis for this paper was to identify and assess procurement methods in use in the Nigerian construction industry and identify the factors that affect the choice of the variants under the traditional and the non-conventional procurement methods. Data were collected using well-structured questionnaires administered to professionals in Lagos metropolis. Data collected were analyzed using descriptive and inferential statistics. The study reveals that the variants of traditional method of contract procurement are the most adopted in project execution in Nigeria. In making choice of procurement method, the study reveals that project completion at estimated time ranks as the highest factor considered for traditional method, while quality assurance ranks highest with non-conventional method.

  14. The research of electrical tracing system construction management and related questions of BOP project

    International Nuclear Information System (INIS)

    Wang Lining; Li Jingmin; Ma Ding; Tu Haitao

    2015-01-01

    Based on Hongyanhe nuclear power plant in Liaoning province, the paper studies the anti-freeze and heat tracing work of BOP project. It compares several different heat tracing solutions in terms of technicality and applicability, and gave the most suitable scheme by using electrical tracing. It also presents the construction details of the electrical tracing system, analyzes the key points of the construction management from quantity, safety and schedule aspects, and gave the improvement suggestions. (authors)

  15. Satellite Validation: A Project to Create a Data-Logging System to Monitor Lake Tahoe

    Science.gov (United States)

    Roy, Rudy A.

    2005-01-01

    Flying aboard the satellite Terra, the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) is an imaging instrument used to acquire detailed maps of Earth's surface temperature, elevation, emissivity, and reflectance. An automated site consisting of four buoys was established 6 years ago at Lake Tahoe for the validation of ASTERS thermal infrared data. Using Campbell CR23X Dataloggers, a replacement system to be deployed on a buoy was designed and constructed for the measurement of the lake's temperature profile, surrounding air temperature, humidity, wind direction and speed, net radiation, and surface skin temperature. Each Campbell Datalogger has been programmed to control, power, and monitor 14 different temperature sensors, a JPL-built radiometer, and an RM Young 32500 meteorological station. The logger communicates with the radiometer and meteorological station through a Campbell SDM-SIO4 RS232 serial interface, sending polling commands, and receiving filtered data back from the sensors. This data is then cataloged and sent back across a cellular modem network every hour to JPL. Each instrument is wired via a panel constructed with 18 individual plugs that allow for simple installation and expansion. Data sent back from the system are analyzed at JPL, where they are used to calibrate ASTER data.

  16. Project management in fossil plant construction: A perspective for the Nineties

    International Nuclear Information System (INIS)

    Bhatia, N.K.

    1991-01-01

    The continuing growth in demand for electric power, and the reluctance of electric utility management to commit to new capacity additions has created a potential for somewhat hectic activity in the fossil power plant construction market. With the changing matrix of power plant types and ownerships, the project manager is called upon to deliver a complex product with exacting contract requirements: lump sum contracts, competitive pricing, short schedules, and performance guarantees. A shortage of experienced professionals in the ranks of the owners, engineers, contractors, and suppliers magnifies the challenge. Plant replication, automation, creative management of vendors and contractors, and participative management of the work force will be key elements of successful projects. Partnering between the clients and the engineers-constructors will be an interesting new relationship model

  17. A study of the planned value estimation method for developing earned value management system in the nuclear power plant construction project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.H.; Moon, B.S., E-mail: gustblast@khnp.co.kr, E-mail: moonbs@khnp.co.kr [Korea Hydro & Nuclear power co.,Ltd., Central Research Inst., Daejeon (Korea, Republic of); Lee, J.H., E-mail: ljh@kkprotech.com [Kong Kwan Protech Co.,Ltd., Seoul (Korea, Republic of)

    2014-07-01

    The Earned Value Management System (EVMS) is a project management technique for measuring project performance and progress, and then forward projection through the integrated management and control of cost and schedule. This research reviewed the concept of the EVMS method, and proposes two Planned Value estimation methods for the potential application to succeeding NPP construction projects by using the historical data from the proceeding NPP projects. This paper is to introduce the solution for the problems caused by the absence of relevant management system incorporating schedule and cost, which has arisen as repeated issues in NPP construction project management. (author)

  18. A study of the planned value estimation method for developing earned value management system in the nuclear power plant construction project

    International Nuclear Information System (INIS)

    Lee, S.H.; Moon, B.S.; Lee, J.H.

    2014-01-01

    The Earned Value Management System (EVMS) is a project management technique for measuring project performance and progress, and then forward projection through the integrated management and control of cost and schedule. This research reviewed the concept of the EVMS method, and proposes two Planned Value estimation methods for the potential application to succeeding NPP construction projects by using the historical data from the proceeding NPP projects. This paper is to introduce the solution for the problems caused by the absence of relevant management system incorporating schedule and cost, which has arisen as repeated issues in NPP construction project management. (author)

  19. DebriSat - A Planned Laboratory-Based Satellite Impact Experiment for Breakup Fragment Characterization

    Science.gov (United States)

    Liou, J.-C.; Fitz-Coy, N.; Werremeyer, M.; Huynh, T.; Voelker, M.; Opiela, J.

    2012-01-01

    DebriSat is a planned laboratory ]based satellite hypervelocity impact experiment. The goal of the project is to characterize the orbital debris that would be generated by a hypervelocity collision involving a modern satellite in low Earth orbit (LEO). The DebriSat project will update and expand upon the information obtained in the 1992 Satellite Orbital Debris Characterization Impact Test (SOCIT), which characterized the breakup of a 1960 's US Navy Transit satellite. There are three phases to this project: the design and fabrication of an engineering model representing a modern, 50-cm/50-kg class LEO satellite known as DebriSat; conduction of a laboratory-based hypervelocity impact to catastrophically break up the satellite; and characterization of the properties of breakup fragments down to 2 mm in size. The data obtained, including fragment size, area ]to ]mass ratio, density, shape, material composition, optical properties, and radar cross ]section distributions, will be used to supplement the DoD fs and NASA fs satellite breakup models to better describe the breakup outcome of a modern satellite. Updated breakup models will improve mission planning, environmental models, and event response. The DebriSat project is sponsored by the Air Force fs Space and Missile Systems Center and the NASA Orbital Debris Program Office. The design and fabrication of DebriSat is led by University of Florida with subject matter experts f support from The Aerospace Corporation. The major milestones of the project include the complete fabrication of DebriSat by September 2013, the hypervelocity impact of DebriSat at the Air Force fs Arnold Engineering Development Complex in early 2014, and fragment characterization and data analyses in late 2014.

  20. Restoration and construction (buildings). Solar electric power. How to complete a photovoltaic project

    International Nuclear Information System (INIS)

    Bareau, Helene; Juniere, Olivier

    2017-10-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic but comprehensive outlook on the way to complete a solar photovoltaic project in the cases of the restoration or the construction of a building. After a presentation of solar energy, its transformation into electric power, and the installation of solar photovoltaic panels and equipment, the brochure exposes the various steps of a photovoltaic project: economic analysis (cost estimation, budgets, financing incentives, power prices, the choice between selling or using electric power, the contracts, etc.), the planning of the project, the administrative procedure, the selection of a professional installer, how to run the photovoltaic system, how to run the business, etc