WorldWideScience

Sample records for sample management implementation

  1. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  2. Guidance for establishment and implementation of field sample management programs in support of EM environmental sampling and analysis activities

    International Nuclear Information System (INIS)

    1994-01-01

    The role of the National Sample Management Program (NSMP) proposed by the Department of Energy's Office of Environmental Management (EM) is to be a resource for EM programs and for local Field Sample Management Programs (FSMPs). It will be a source of information on sample analysis and data collection within the DOE complex. The purpose of this document is to establish the suggested scope of the FSMP activities to be performed under each Operations Office, list the drivers under which the program will operate, define terms and list references. This guidance will apply only to EM sampling and analysis activities associated with project planning, contracting, laboratory selection, sample collection, sample transportation, laboratory analysis and data management

  3. A Model Of The Underlying Philosophy And Criteria For Effective Implementation Of Performance Management

    Directory of Open Access Journals (Sweden)

    C. M. Whitford

    2006-11-01

    Full Text Available The objective of this study was to develop a model that assists organisations in implementing performance management effectively. A model describing the philosophical paradigm underpinning best practice in performance management and the criteria for effective implementation of performance management was developed. The sample used in this study was a convenience sample of 615 employees. Exploratory factor analysis revealed three reliable philosophical dimensions. Moderate correlations were found between the three dimensions and some of the implementation criteria.

  4. Factors influencing implementation of integrated management of ...

    African Journals Online (AJOL)

    Background: Save the Children Tanzania has been supporting several projects in Lindi Region including implementation of health facility based Integrated Management of Childhood Illness (IMCI) services in Kilwa, Ruangwa and Lindi rural districts. The objective of this study was to assess the IMCI services in a sample of ...

  5. Guidance for establishment and implementation of a national sample management program in support of EM environmental sampling and analysis activities

    International Nuclear Information System (INIS)

    1994-01-01

    The role of the National Sample Management Program (NSMP) proposed by the Department of Energy's Office of Environmental Management (EM) is to be a resource for EM programs and for local Field Sample Management Programs (FSMPs). It will be a source of information on sample analysis and data collection within the DOE complex. Therefore the NSMP's primary role is to coordinate and function as a central repository for information collected from the FSMPs. An additional role of the NSMP is to monitor trends in data collected from the FSMPs over time and across sites and laboratories. Tracking these trends will allow identification of potential problems in the sampling and analysis process

  6. Implementing reduced-risk integrated pest management in fresh-market cabbage: influence of sampling parameters, and validation of binomial sequential sampling plans for the cabbage looper (Lepidoptera Noctuidae).

    Science.gov (United States)

    Burkness, Eric C; Hutchison, W D

    2009-10-01

    Populations of cabbage looper, Trichoplusiani (Lepidoptera: Noctuidae), were sampled in experimental plots and commercial fields of cabbage (Brasicca spp.) in Minnesota during 1998-1999 as part of a larger effort to implement an integrated pest management program. Using a resampling approach and the Wald's sequential probability ratio test, sampling plans with different sampling parameters were evaluated using independent presence/absence and enumerative data. Evaluations and comparisons of the different sampling plans were made based on the operating characteristic and average sample number functions generated for each plan and through the use of a decision probability matrix. Values for upper and lower decision boundaries, sequential error rates (alpha, beta), and tally threshold were modified to determine parameter influence on the operating characteristic and average sample number functions. The following parameters resulted in the most desirable operating characteristic and average sample number functions; action threshold of 0.1 proportion of plants infested, tally threshold of 1, alpha = beta = 0.1, upper boundary of 0.15, lower boundary of 0.05, and resampling with replacement. We found that sampling parameters can be modified and evaluated using resampling software to achieve desirable operating characteristic and average sample number functions. Moreover, management of T. ni by using binomial sequential sampling should provide a good balance between cost and reliability by minimizing sample size and maintaining a high level of correct decisions (>95%) to treat or not treat.

  7. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  8. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  9. Implementation of Knowledge Management in Organizations

    Science.gov (United States)

    Winkler, Katrin; Mandl, Heinz

    2007-01-01

    In the context of learning implementation of new ideas e.g. knowledge management in organizations often is neglected. Concerning knowledge management measures we demonstrate its implementation in organizations. A theoretical framework was developed showing the necessary basic conditions for implementing knowledge management. Subsequently we…

  10. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  11. Improving the Acquisition and Management of Sample Curation Data

    Science.gov (United States)

    Todd, Nancy S.; Evans, Cindy A.; Labasse, Dan

    2011-01-01

    This paper discusses the current sample documentation processes used during and after a mission, examines the challenges and special considerations needed for designing effective sample curation data systems, and looks at the results of a simulated sample result mission and the lessons learned from this simulation. In addition, it introduces a new data architecture for an integrated sample Curation data system being implemented at the NASA Astromaterials Acquisition and Curation department and discusses how it improves on existing data management systems.

  12. IMPLEMENTING A RISK MANAGEMENT STANDARD

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2013-01-01

    Full Text Available After risk management “conquered” more and more project managers’ minds and showed its benefits for business and programs, the need to have a global risk management standard has become a crucial issue in the world of risk management. But having a global risk management standard has been a big challenge, starting from the decision of developing the standard (March-June 2005, to the moment of publishing it, November 2009. So, developing the ISO 31000:2009 standard has been more or less like a bumpy ride. Apparently, the people involved in developing the global risk management standard understood from the very beginning that no challenges are too big, nor any tasks too small and that the task of having a new, comprehensive global risk management standard should be completed with excellence: defining the principles and the framework guiding the risk management process applicable for all type of organizations and for a wide range of activities. Coming up with a global standard should always be based on the real organizations’ needs and should fulfill real risk management requirements. The article is trying to present the pros and cons of risk management standard implementation, challenging the implementation process itself and the added value of implementing the standard due to the lack of implementation enablers, like risk culture, a real problem especially in an international environment.

  13. Uncovering middle managers' role in healthcare innovation implementation.

    Science.gov (United States)

    Birken, Sarah A; Lee, Shoou-Yih Daniel; Weiner, Bryan J

    2012-04-03

    Middle managers have received little attention in extant health services research, yet they may have a key role in healthcare innovation implementation. The gap between evidence of effective care and practice may be attributed in part to poor healthcare innovation implementation. Investigating middle managers' role in healthcare innovation implementation may reveal an opportunity for improvement. In this paper, we present a theory of middle managers' role in healthcare innovation implementation to fill the gap in the literature and to stimulate research that empirically examines middle managers' influence on innovation implementation in healthcare organizations. Extant healthcare innovation implementation research has primarily focused on the roles of physicians and top managers. Largely overlooked is the role of middle managers. We suggest that middle managers influence healthcare innovation implementation by diffusing information, synthesizing information, mediating between strategy and day-to-day activities, and selling innovation implementation. Teamwork designs have become popular in healthcare organizations. Because middle managers oversee these team initiatives, their potential to influence innovation implementation has grown. Future research should investigate middle managers' role in healthcare innovation implementation. Findings may aid top managers in leveraging middle managers' influence to improve the effectiveness of healthcare innovation implementation.

  14. Between a rock and a hard place: Management and implementation teams’ expectations of project managers in an agile information systems delivery environment

    Directory of Open Access Journals (Sweden)

    Songezo Nkukwana

    2017-08-01

    Objectives: This case study investigated how project managers could adapt to agile IS implementation environments to remain relevant. Specifically, the views of their key stakeholders (the management and implementation teams were elicited to provide insights into what is expected from agile project managers. Method: A qualitative, inductive content analysis approach using purposive sampling was used to identify 13 participants (comprising management and implementation team members within a large South African insurance company. Semi-structured interviews were conducted with all participants. Results: The management and implementation teams agreed that PM remains highly relevant in an agile environment for ensuring project governance including delivery, risk management, reporting and budgeting. There was, however, disagreement between the management and implementation teams on project management interaction with the implementation team. Management preferred a command and control type project manager, while the implementation team favoured a more inclusive, facilitative PM style. Conclusion: To remain viable in an agile IS project implementation environment within large corporates, project managers need to be aware of what various stakeholders expect of them. They need to retain some of the classic PM functions while adapting to the interpersonal and collaborative requirements of the agile way.

  15. Enterprise Content Management Implementation and Risk

    Directory of Open Access Journals (Sweden)

    Jaroslava Klegová

    2015-01-01

    Full Text Available Enterprise Content Management (ECM solutions are commonly used in many areas such as document management, record management, digital asset management, etc. Key features of ECM systems are capturing, indexing, preserving and retrieving of digital information. The state-of-the- art ECM solution can help revolutionize document management and further automated business processes which can lead to better decisions and competitive advantage. Risk management can reduce project failure and that is why controlling risk in ECM implementation projects is considered to be a major contributor to project success. To manage software risk, the first step is to identify a list of ECM projects’ risks. The present paper provides an overview of ECM implementation risks and contains findings from a small survey on experience of ECM implementation and risk in Czech enterprises. Risk of implementation in the public sector is discussed more deeply with case study examples.

  16. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  17. Uncovering middle managers' role in healthcare innovation implementation

    Directory of Open Access Journals (Sweden)

    Birken Sarah A

    2012-04-01

    Full Text Available Abstract Background Middle managers have received little attention in extant health services research, yet they may have a key role in healthcare innovation implementation. The gap between evidence of effective care and practice may be attributed in part to poor healthcare innovation implementation. Investigating middle managers' role in healthcare innovation implementation may reveal an opportunity for improvement. In this paper, we present a theory of middle managers' role in healthcare innovation implementation to fill the gap in the literature and to stimulate research that empirically examines middle managers' influence on innovation implementation in healthcare organizations. Discussion Extant healthcare innovation implementation research has primarily focused on the roles of physicians and top managers. Largely overlooked is the role of middle managers. We suggest that middle managers influence healthcare innovation implementation by diffusing information, synthesizing information, mediating between strategy and day-to-day activities, and selling innovation implementation. Summary Teamwork designs have become popular in healthcare organizations. Because middle managers oversee these team initiatives, their potential to influence innovation implementation has grown. Future research should investigate middle managers' role in healthcare innovation implementation. Findings may aid top managers in leveraging middle managers' influence to improve the effectiveness of healthcare innovation implementation.

  18. Uncovering middle managers' role in healthcare innovation implementation

    Science.gov (United States)

    2012-01-01

    Background Middle managers have received little attention in extant health services research, yet they may have a key role in healthcare innovation implementation. The gap between evidence of effective care and practice may be attributed in part to poor healthcare innovation implementation. Investigating middle managers' role in healthcare innovation implementation may reveal an opportunity for improvement. In this paper, we present a theory of middle managers' role in healthcare innovation implementation to fill the gap in the literature and to stimulate research that empirically examines middle managers' influence on innovation implementation in healthcare organizations. Discussion Extant healthcare innovation implementation research has primarily focused on the roles of physicians and top managers. Largely overlooked is the role of middle managers. We suggest that middle managers influence healthcare innovation implementation by diffusing information, synthesizing information, mediating between strategy and day-to-day activities, and selling innovation implementation. Summary Teamwork designs have become popular in healthcare organizations. Because middle managers oversee these team initiatives, their potential to influence innovation implementation has grown. Future research should investigate middle managers' role in healthcare innovation implementation. Findings may aid top managers in leveraging middle managers' influence to improve the effectiveness of healthcare innovation implementation. PMID:22472001

  19. An Internationally Coordinated Science Management Plan for Samples Returned from Mars

    Science.gov (United States)

    Haltigin, T.; Smith, C. L.

    2015-12-01

    Mars Sample Return (MSR) remains a high priority of the planetary exploration community. Such an effort will undoubtedly be too large for any individual agency to conduct itself, and thus will require extensive global cooperation. To help prepare for an eventual MSR campaign, the International Mars Exploration Working Group (IMEWG) chartered the international Mars Architecture for the Return of Samples (iMARS) Phase II working group in 2014, consisting of representatives from 17 countries and agencies. The overarching task of the team was to provide recommendations for progressing towards campaign implementation, including a proposed science management plan. Building upon the iMARS Phase I (2008) outcomes, the Phase II team proposed the development of an International MSR Science Institute as part of the campaign governance, centering its deliberations around four themes: Organization: including an organizational structure for the Institute that outlines roles and responsibilities of key members and describes sample return facility requirements; Management: presenting issues surrounding scientific leadership, defining guidelines and assumptions for Institute membership, and proposing a possible funding model; Operations & Data: outlining a science implementation plan that details the preliminary sample examination flow, sample allocation process, and data policies; and Curation: introducing a sample curation plan that comprises sample tracking and routing procedures, sample sterilization considerations, and long-term archiving recommendations. This work presents a summary of the group's activities, findings, and recommendations, highlighting the role of international coordination in managing the returned samples.

  20. Document Management Projects: implementation guide

    OpenAIRE

    Beatriz Bagoin Guimarães

    2016-01-01

    Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations...

  1. The IGSN Experience: Successes and Challenges of Implementing Persistent Identifiers for Samples

    Science.gov (United States)

    Lehnert, Kerstin; Arko, Robert

    2016-04-01

    Physical samples collected and studied in the Earth sciences represent both a research resource and a research product in the Earth Sciences. As such they need to be properly managed, curated, documented, and cited to ensure re-usability and utility for future science, reproducibility of the data generated by their study, and credit for funding agencies and researchers who invested substantial resources and intellectual effort into their collection and curation. Use of persistent and unique identifiers and deposition of metadata in a persistent registry are therefore as important for physical samples as they are for digital data. The International Geo Sample Number (IGSN) is a persistent, globally unique identifier. Its adoption by individual investigators, repository curators, publishers, and data managers is rapidly growing world-wide. This presentation will provide an analysis of the development and implementation path of the IGSN and relevant insights and experiences gained along its way. Development of the IGSN started in 2004 as part of a US NSF-funded project to establish a registry for sample metadata, the System for Earth Sample Registration (SESAR). The initial system provided a centralized solution for users to submit information about their samples and obtain IGSNs and bar codes. Challenges encountered during this initial phase related to defining the scope of the registry, granularity of registered objects, responsibilities of relevant actors, and workflows, and designing the registry's metadata schema, its user interfaces, and the identifier itself, including its syntax. The most challenging task though was to make the IGSN an integral part of personal and institutional sample management, digital management of sample-based data, and data publication on a global scale. Besides convincing individual researchers, curators, editors and publishers, as well as data managers in US and non-US academia, state and federal agencies, the PIs of the SESAR project

  2. Implementing complex innovations: factors influencing middle manager support.

    Science.gov (United States)

    Chuang, Emmeline; Jason, Kendra; Morgan, Jennifer Craft

    2011-01-01

    Middle manager resistance is often described as a major challenge for upper-level administrators seeking to implement complex innovations such as evidence-based protocols or new skills training. However, factors influencing middle manager support for innovation implementation are currently understudied in the U.S. health care literature. This article examined the factors that influence middle managers' support for and participation in the implementation of work-based learning, a complex innovation adopted by health care organizations to improve the jobs, educational pathways, skills, and/or credentials of their frontline workers. We conducted semistructured interviews and focus groups with 92 middle managers in 17 health care organizations. Questions focused on understanding middle managers' support for work-based learning as a complex innovation, facilitators and barriers to the implementation process, and the systems changes needed to support the implementation of this innovation. Factors that emerged as influential to middle manager support were similar to those found in broader models of innovation implementation within the health care literature. However, our findings extend previous research by developing an understanding about how middle managers perceived these constructs and by identifying specific strategies for how to influence middle manager support for the innovation implementation process. These findings were generally consistent across different types of health care organizations. Study findings suggest that middle manager support was highest when managers felt the innovation fit their workplace needs and priorities and when they had more discretion and control over how it was implemented. Leaders seeking to implement innovations should consider the interplay between middle managers' control and discretion, their narrow focus on the performance of their own departments or units, and the dedication of staff and other resources for empowering their

  3. Implementation E-Learning among Jordanian School's Management

    Science.gov (United States)

    Hamadin, Khaled

    2017-01-01

    This study is designed to determine the level of E-learning Implementation in Jordan schools management. The study also investigated the Implementation of secondary School management towards the use of e-learning. A survey research design was used. A questionnaire was adopted and sent to secondary School management (N = 250) in Jordan schools in…

  4. ERP implementations and their impact upon management accountants

    OpenAIRE

    Sangster, Alan; Leech, Stewart A.; Grabski, Severin

    2009-01-01

    This paper considers the impact of ERP implementations upon the role of management accountants, upon management accounting in general, and upon business processes. It does so in the context of the perceived success of the ERP implementation. A postal questionnaire was circulated to almost 700 management accountants working in large UK-based organisations. It finds that under successful ERP implementations, management accountants have time for other, less mundane activities and their role beco...

  5. Implementation of quality management systems: the role of hospital (management) boards.

    NARCIS (Netherlands)

    Botje, D.; Klazinga, N.S.; Suñol, R.; Wagner, C.

    2013-01-01

    Objectives: Hospitals are putting tremendous efforts in implementing evidence-based management systems and organisational innovations for patient-centred care. Having a hospital quality management system is a prerequisite to successfully implement these innovations. Previous studies showed that the

  6. Communication Channels as Implementation Determinants of Performance Management Framework in Kenya

    Science.gov (United States)

    Sang, Jane

    2016-01-01

    The purpose of this study to assess communication channels as implementation determinants of performance management framework In Kenya at Moi Teaching and Referral Hospital (MTRH). The communication theory was used to inform the study. This study adopted an explanatory design. The target sampled 510 respondents through simple random and stratified…

  7. ADMINISTRATIVE INSTRUMENTS IN IMPLEMENTING FUNCTIONAL STRATEGIES COMPETITIVENESS MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Iryna Stankovska

    2017-03-01

    Full Text Available The article explores the use of  аdministrative instruments in implementing functional strategies competitiveness management. Due to providing strategic financial management competitiveness the use of administrative levers of control in the formulation and implementation of financial strategies were investigated. System of financial policies forming by individual policies of  general financial strategy, which is an administrative levers of influence on implementation strategies, was proposed. Structure strategic alternatives of financial and investment strategy implementation based on the decomposition and decision tree was formed. To select strategic alternatives, to identify strategic gaps and evaluate deviations from specified target markers in the implementation of financial policies using GAP-analysis that is a tool of management analysis was proposed. Key words: functional strategy, financial strategy, competitiveness management, financial policy, administrative instruments, GAP-analysis.

  8. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  9. Evaluating safety management system implementation

    International Nuclear Information System (INIS)

    Preuss, M.

    2009-01-01

    Canada is committed to not only maintaining, but also improving upon our record of having one of the safest aviation systems in the world. The development, implementation and maintenance of safety management systems is a significant step towards improving safety performance. Canada is considered a world leader in this area and we are fully engaged in implementation. By integrating risk management systems and business practices, the aviation industry stands to gain better safety performance with less regulatory intervention. These are important steps towards improving safety and enhancing the public's confidence in the safety of Canada's aviation system. (author)

  10. Enterprise risk management: Factors associated with effective implementation

    Directory of Open Access Journals (Sweden)

    Godson K. Mensah

    2016-11-01

    Full Text Available Risk management is undergoing a great change, as organizations shift from the traditional and compartmental to an enterprise wide approach. Consequently, enterprise risk management (ERM is gaining global attention among risk management professionals and academics. The demand for the adoption of ERM has led to several companies embracing it, yet its implementation has become challenging. Research shows that ERM approach emphasizes a holistic approach for assessing and evaluating the risks that an organization faces as against the “silo” approach of the traditional methods. The extant literature shows that through the reduction of the risk that an organization faces, ERM is capable of improving the performance and value. The study used a non-experimental correlational approach to explore the relationship between the presence of a chief risk officer (CRO and an audit committee (AC, and the support of top management (TM in relation to the implementation of ERM. A survey instrument was provided to self-identified risk-management professionals who are members of Survey Monkey Audience Service database. The target sample frame requested for analysis using a power of .95 was (n = 119. However, the final number analyzed was (n = 134. Frequencies and percentages were conducted on the demographic survey items and regression and correlational analyses were also performed. The study findings show that there was a significant relationship between the role of a CRO, the presence of an AC, and the support of TM and the level of ERM deployment. The study also found significant correlations between management support level and CRO, and AC. In addition, a much strong positive correlation was noted between the presence of a CRO and an AC

  11. Enterprise Risk Management Implementation Maturity in Non Bank and Financial Companies

    Directory of Open Access Journals (Sweden)

    Subagio Tjahjono

    2017-07-01

    Full Text Available Previous studies of ERM implementation mostly using dummy variable to figure out relation with its determinant. Until today, studies that using risk management maturity as real variable are limited. Therefore, this study intends to determine the maturity level of ERM implementation in non-financial companies listed on Indonesia Stock Exchange during period 2015 and influence of firm’s total assets, total employee, leverage and public ownership to the ERM maturity. The method use are qualitative and multiple regression analysis. The result of data analysis showed that ERM implementation in selected sample during 2015 are still low (majority in initial and repeatable level. In addition, from determinant factors only total asset that have significant influence to the ERM maturity. This result implies that non-financial listed companies are vulnerable to risks. Management should consider future benefit of a mature ERM, not only to comply with regulation.DOI: 10.15408/etk.v16i2.5440 

  12. Integrated management system implementation strategy for PUSPATI TRIGA Reactor

    International Nuclear Information System (INIS)

    Phongsakorn Prak Tom; Shaharum Ramli; Mohamad Azman Che Mat Isa; Shahirah Abdul Rahman; Mohd Zaid Mohamed; Mat Zin Mat Husin; Nurfazila Husain; Mohamad Puad Abu

    2012-01-01

    Integrated Management System (IMS) designed to fulfil the requirements integrates safety, health, environmental, security, quality and economic elements. PUSPATI TRIGA Reactor (RTP) is currently implementing the Quality Assurance Program (QAP) and looking toward implementation of IMS. This paper discussed the implementation strategy of IMS for RTP. There are nine steps of IMS implementation strategy. In implementation of IMS, Gantt chart is useful project management tool in managing the project frame work. IMS is intended as a tool to enable the continuous development of safety culture and achieve higher safety levels. (author)

  13. A systematic review of instruments that assess the implementation of hospital quality management systems.

    Science.gov (United States)

    Groene, Oliver; Botje, Daan; Suñol, Rosa; Lopez, Maria Andrée; Wagner, Cordula

    2013-10-01

    Health-care providers invest substantial resources to establish and implement hospital quality management systems. Nevertheless, few tools are available to assess implementation efforts and their effect on quality and safety outcomes. This review aims to (i) identify instruments to assess the implementation of hospital quality management systems, (ii) describe their measurement properties and (iii) assess the effects of quality management on quality improvement and quality of care outcomes. We performed a systematic literature search from 1990 to 2011 in PubMed, CINAHL, EMBASE, Cochrane Library and Web of Science. In addition, we used snowball strategies, screened the reference lists of eligible papers, reviewed grey literature and contacted experts in the field. and data extraction Two reviewers screened eligible papers based on pre-defined inclusion and exclusion criteria and all authors extracted data. Eligible papers are described in terms of general characteristics (settings, type and level of respondents, mode of data collection), methodological properties (sampling strategy, item derivation, conceptualization of quality management, assessment of reliability and validity, scoring) and application/implementation (accounting for context, organizational adaptations, sensitivity to change, deployment and effect size). Eighteen papers were deemed eligible for inclusion. While some common domains emerged in measurement conceptualization, substantial differences in scope persist. The instruments' measurement properties were insufficiently described and only few instruments assessed links between the implementation of quality management systems (QMS) and improvement strategies or outcomes. There is currently no well-established measure to assess the implementation and effectiveness of quality management systems. Future research should address this gap.

  14. Sample and data management process description

    International Nuclear Information System (INIS)

    Kessner, J.H.

    2000-01-01

    The sample and data management process was initiated in 1994 as a result of a process improvement workshop. The purpose of the workshop was to develop a sample and data management process that would reduce cycle time and costs, simplify systems and procedures, and improve customer satisfaction for sampling, analytical services, and data management activities

  15. Implementation Of Strategic Management: The Challenges And ...

    African Journals Online (AJOL)

    . Only the discerning organizations can manage the changes and vagaries through the implementation of effective strategic management. This article examines the concept of strategic management and its implication for organizational ...

  16. ACS sampling system: design, implementation, and performance evaluation

    Science.gov (United States)

    Di Marcantonio, Paolo; Cirami, Roberto; Chiozzi, Gianluca

    2004-09-01

    By means of ACS (ALMA Common Software) framework we designed and implemented a sampling system which allows sampling of every Characteristic Component Property with a specific, user-defined, sustained frequency limited only by the hardware. Collected data are sent to various clients (one or more Java plotting widgets, a dedicated GUI or a COTS application) using the ACS/CORBA Notification Channel. The data transport is optimized: samples are cached locally and sent in packets with a lower and user-defined frequency to keep network load under control. Simultaneous sampling of the Properties of different Components is also possible. Together with the design and implementation issues we present the performance of the sampling system evaluated on two different platforms: on a VME based system using VxWorks RTOS (currently adopted by ALMA) and on a PC/104+ embedded platform using Red Hat 9 Linux operating system. The PC/104+ solution offers, as an alternative, a low cost PC compatible hardware environment with free and open operating system.

  17. Implementing Total Quality Management in a University Setting.

    Science.gov (United States)

    Coate, L. Edwin

    1991-01-01

    Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…

  18. How Does Implementation of Environmental Management System Contribute to Corporate Sustainability Management

    Directory of Open Access Journals (Sweden)

    Lucie Vnoučková

    2014-01-01

    Full Text Available Corporate sustainability management (CSM appears to be an important issue for current management. The aim of the paper is to identify what determinants of sustainability management are examined in the literature and discuss the contribution of environmental management system (EMS to CSM based on experiences of selected Czech organizations with implemented EMS according to ISO 14001. The data for the survey was gathered from 222 organizations (N = 1265 who have already implemented EMS. The results show there is a basic knowledge of sustainability concept in the surveyed Czech organizations. Perceived improvements of EMS implementation in Czech organizations are mainly in the area of environmental performance, economic performance, relationship with involved parties and social issues. Based on the implementation of EMS, the organizations take care about corporate sustainability (about the areas of environmental aspects and impacts of the organization. Improved environmental performance has been linked with process and product cost improvements and lower risk factors.

  19. ADMINISTRATIVE INSTRUMENTS IN IMPLEMENTING FUNCTIONAL STRATEGIES COMPETITIVENESS MANAGEMENT

    OpenAIRE

    Stankovska, Iryna

    2017-01-01

    The article explores the use of  аdministrative instruments in implementing functional strategies competitiveness management. Due to providing strategic financial management competitiveness the use of administrative levers of control in the formulation and implementation of financial strategies were investigated. System of financial policies forming by individual policies of  general financial strategy, which is an administrative levers of influence on implementation strategies, was proposed...

  20. Successful implementation of self-managing teams

    NARCIS (Netherlands)

    Weerheim, W. (Wilke); Van Rossum, L. (Lisa); Ten Have, W.D. (Wouter Dirk)

    2018-01-01

    textabstractPurpose: Following health-care organisations, many mental health-care organisations nowadays consider starting to work with self-managing teams as their organisation structure. Although the concept could be effective, the way of implementing self-managing teams in an organisation is

  1. Understanding the Implementation of Knowledge Management in High-Performance Schools in Malaysia

    Directory of Open Access Journals (Sweden)

    Rahmad Sukor Ab. Samad

    2014-12-01

    Full Text Available This study intends to assess the implementation of policies in high-performance schools (HPS. One hundred fifty-two administrators in 52 HPS were selected using full sampling. Only two factors serve as contributors in knowledge management model for high-performing schools in Malaysia, which were school culture and school strategy. Whereas the correlation indicated that all 10 factors, namely, mission and vision, school strategy, school culture, intellectual modal, learning organization, leadership management, teamwork and learning community, knowledge sharing, new knowledge generation, and digital advancement, have significant relationships with the understanding of knowledge management, at different levels.

  2. Authentic Leadership: Strategy of the Implementation of Madrasah Management of Change

    Directory of Open Access Journals (Sweden)

    Aan Komariah

    2017-12-01

    Full Text Available Implementing the management of madrasah change starts from an authentic leadership. Authentic leadership is the identity of a head of madrasah in developing value-based educational system. His identity is seen from his sincerity in working, his kindness in treating people and the sharpness of his mind in determining the future of the organization. The authentic leadership of madrasah should represent the identity of moslem morality with work orientation on the sincerity of being a STAF+B (Siddiq, Tablig, Amanah, Fathonah + Brave leader. Leading the madrasah in the context of implementing management of change is not enough to be pious but it requires courage to take strategic and innovative decisions in realizing a qualified madrasah. This research aims to find an authentic leadership strategy model for management of change by head of madrasah. The research was conducted on the head of madrasah in Pangandaran Regency. The results show that the application of authentic leadership can build madrasah changes by empowering the Professional Learning Community (PLC in which 4CS strategy is implemented in a reciprocal (cumsuis-Casing, Communicating, Competencies, Contribution, Sample. The followers can identify who the authentic leader is by finding the integrity of identity that represents in: his mind is vision; his heart is good and his legs work hard.

  3. Successful implementation of self-managing teams

    NARCIS (Netherlands)

    Weerheim, Wilke; Van Rossum, Lisa; Ten Have, Wouter Dirk

    2018-01-01

    Purpose: Following health-care organisations, many mental health-care organisations nowadays consider starting to work with self-managing teams as their organisation structure. Although the concept could be effective, the way of implementing self-managing teams in an organisation is crucial to

  4. Strategic Public Management - Selected Experiences with BSC Implementation

    Directory of Open Access Journals (Sweden)

    Milan PŮČEK

    2014-02-01

    Full Text Available Elements associated with modern approaches towards public management have been gaining ground in various forms in the Czech public administration, especially in the last decade. They reflect the priorities of the public administration reform and the enhanced opportunities for co-financing the implementation of new management tools from European funds. This article summarizes the experience of strategic management, based on the analysis of secondary sources and on the experience of one of the authors who has worked as manager in several public administration/public sector institutions. In the practical part, the article focuses on the potential and limits of implementation of the Balanced Scorecard using the practical experience together with the implementation of this instrument at the level of city and ministry.

  5. INEL Sample Management Office

    International Nuclear Information System (INIS)

    Watkins, C.

    1994-01-01

    The Idaho National Engineering Laboratory (INEL) Sample Management Office (SMO) was formed as part of the EG ampersand G Idaho Environmental Restoration Program (ERP) in June, 1990. Since then, the SMO has been recognized and sought out by other prime contractors and programs at the INEL. Since December 1991, the DOE-ID Division Directors for the Environmental Restoration Division and Waste Management Division supported the expansion of the INEL ERP SMO into the INEL site wide SMO. The INEL SMO serves as a point of contact for multiple environmental analytical chemistry and laboratory issues (e.g., capacity, capability). The SMO chemists work with project managers during planning to help develop data quality objectives, select appropriate analytical methods, identify special analytical services needs, identify a source for the services, and ensure that requirements for sampling and analysis (e.g., preservations, sample volumes) are clear and technically accurate. The SMO chemists also prepare work scope statements for the laboratories performing the analyses

  6. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  7. Estuary ecosystem restoration: implementing and institutionalizing adaptive management: Institutionalizing adaptive management

    Energy Technology Data Exchange (ETDEWEB)

    Ebberts, Blaine D. [Portland District, U.S. Army Corps of Engineers, 333 SW 1st Avenue, Portland OR 97204 U.S.A.; Zelinsky, Ben D. [Fish and Wildlife Division, Bonneville Power Administration, 905 NE 11th Avenue, Portland OR 97208 U.S.A.; Karnezis, Jason P. [Fish and Wildlife Division, Bonneville Power Administration, 905 NE 11th Avenue, Portland OR 97208 U.S.A.; Studebaker, Cynthia A. [Portland District, U.S. Army Corps of Engineers, 333 SW 1st Avenue, Portland OR 97204 U.S.A.; Lopez-Johnston, Siena [Fish and Wildlife Division, Bonneville Power Administration, 905 NE 11th Avenue, Portland OR 97208 U.S.A.; Creason, Anne M. [Fish and Wildlife Division, Bonneville Power Administration, 905 NE 11th Avenue, Portland OR 97208 U.S.A.; Krasnow, Lynne [Columbia Hydropower Branch, National Marine Fisheries Service, 1201 NE Lloyd Boulevard Suite 1100, Portland OR 97232 U.S.A.; Johnson, Gary E. [Pacific Northwest National Laboratory, 620 SW 5th Avenue, Suite 810, Portland OR 97204 U.S.A.; Thom, Ronald M. [Pacific Northwest National Laboratory, Marine Science Laboratory, 1286 Washington Harbor Road, Sequim WA 98382 U.S.A.

    2017-08-25

    We successfully implemented and institutionalized an adaptive management (AM) process for the Columbia Estuary Ecosystem Restoration Program, which is a large-scale restoration program focused on improving ecosystem conditions in the 234-km lower Columbia River and estuary. For our purpose, “institutionalized” means the AM process and restoration program are embedded in the work flow of the implementing agencies and affected parties. While plans outlining frameworks, processes, or approaches to AM of ecosystem restoration programs are commonplace, establishment for the long term is not. This paper presents the basic AM framework and explains how AM was implemented and institutionalized. Starting with a common goal, we pursued included a well-understood governance and decision-making structure, routine coordination and communication activities, data and information sharing, commitment from partners and upper agency management to the AM process, and meaningful cooperation among program managers and partners. The overall approach and steps to implement and institutionalize AM for ecosystem restoration explained here are applicable to situations where it has been less than successful or, as in our case, the restoration program is just getting started.

  8. Impact of implementing ISO 9001:2008 standard on the Spanish Renal Research Network biobank sample transfer process.

    Science.gov (United States)

    Cortés, M Alicia; Irrazábal, Emanuel; García-Jerez, Andrea; Bohórquez-Magro, Lourdes; Luengo, Alicia; Ortiz-Arduán, Alberto; Calleros, Laura; Rodríguez-Puyol, Manuel

    2014-01-01

    Biobank certification ISO 9001:2008 aims to improve the management of processes performed. This has two objectives: customer satisfaction and continuous improvement. This paper presents the impact of certification ISO 9001:2008 on the sample transfer process in a Spanish biobank specialising in kidney patient samples. The biobank experienced a large increase in the number of samples between 2009 (12,582 vials) and 2010 (37,042 vials). The biobank of the Spanish Renal Research Network (REDinREN), located at the University of Alcalá, has implemented ISO standard 9001:2008 for the effective management of human material given to research centres. Using surveys, we analysed two periods in the “sample transfer” process. During the first period between 1-10-12 and 26-11-12 (8 weeks), minimal changes were made to correct isolated errors. In the second period, between 7-01-13 and 18-02-13 (6 weeks), we carried out general corrective actions. The identification of problems and implementation of corrective actions for certification allowed: a 70% reduction in the process execution time, a significant increase (200%) in the number of samples processed and a 25% improvement in the process. The increase in the number of samples processed was directly related to process improvement. The certification of ISO standard 9001:2008, obtained in July 2013, allowed an improvement of the REDinREN biobank processes to be achieved, which increased quality and customer satisfaction.

  9. Assessment of the implementation of environmental management ...

    African Journals Online (AJOL)

    Assessment of the implementation of environmental management system in the construction ... Journal of Fundamental and Applied Sciences ... The Environmental Management System (EMS) illustrates a possible solution to reduce the ...

  10. Implementing ecosystem-based marine management as a process of regionalisation

    DEFF Research Database (Denmark)

    Hegland, Troels Jacob; Raakjær, Jesper; van Tatenhove, Jan

    2015-01-01

    and the Baltic Sea Fisheries Forum, both examples of regionalisation processes in order to implement ecosystem-based marine management. The Helsinki Commission Group for implementation of the ecosystem approach is a joint management body for the implementation of the Baltic Sea Action Plan and the European Union......This article deals with the implementation of ecosystem-based marine management in the Baltic Sea. It explores and documents in particular the preliminary lessons from environmental and fisheries management with reference to the Helsinki Commission Group for implementation of the ecosystem approach......'s Marine Strategy Framework Directive. The Baltic Sea Fisheries Forum is a new governing body to facilitate regional cooperation in fisheries management. The aim of the article is twofold: a) to describe and discuss two different pathways of regionalisation in the Baltic Sea and b) to explore how...

  11. Understanding the Implementation of Knowledge Management in High-Performance Schools in Malaysia

    OpenAIRE

    Rahmad Sukor Ab. Samad; Mohamed Iskandar Rahmad Sukor; Darwyan Syah; Eneng Muslihah

    2014-01-01

    This study intends to assess the implementation of policies in high-performance schools (HPS). One hundred fifty-two administrators in 52 HPS were selected using full sampling. Only two factors serve as contributors in knowledge management model for high-performing schools in Malaysia, which were school culture and school strategy. Whereas the correlation indicated that all 10 factors, namely, mission and vision, schoo...

  12. Determinants of quality management systems implementation in hospitals.

    Science.gov (United States)

    Wardhani, Viera; Utarini, Adi; van Dijk, Jitse Pieter; Post, Doeke; Groothoff, Johan Willem

    2009-03-01

    To identify the problems and facilitating factors in the implementation of quality management system (QMS) in hospitals through a systematic review. A search strategy was performed on the Medline database for articles written in English published between 1992 and early 2006. Using the thesaurus terms 'Total Quality Management' and 'Quality Assurance Health Care', combined with the term 'hospital' and 'implement*', we identified 533 publications. The screening process was based on empirical articles describing organization-wide QMS implementation. Fourteen empirical articles fulfilled the inclusion criteria and were reviewed in this paper. An organization culture emphasizing standards and values associated with affiliation, teamwork and innovation, assumption of change and risk taking, play as the key success factor in QMS implementation. This culture needs to be supported by sufficient technical competence to apply a scientific problem-solving approach. A clear distribution of QMS function within the organizational structure is more important than establishing a formal quality structure. In addition to management leadership, physician involvement also plays an important role in implementing QMS. Six supporting and limiting factors determining QMS implementation are identified in this review. These are the organization culture, design, leadership for quality, physician involvement, quality structure and technical competence.

  13. From strategy to action: how top managers' support increases middle managers' commitment to innovation implementation in health care organizations.

    Science.gov (United States)

    Birken, Sarah A; Lee, Shoou-Yih Daniel; Weiner, Bryan J; Chin, Marshall H; Chiu, Michael; Schaefer, Cynthia T

    2015-01-01

    Evidence suggests that top managers' support influences middle managers' commitment to innovation implementation. What remains unclear is how top managers' support influences middle managers' commitment. Results may be used to improve dismal rates of innovation implementation. We used a mixed-method sequential design. We surveyed (n = 120) and interviewed (n = 16) middle managers implementing an innovation intended to reduce health disparities in 120 U.S. health centers to assess whether top managers' support directly influences middle managers' commitment; by allocating implementation policies and practices; or by moderating the influence of implementation policies and practices on middle managers' commitment. For quantitative analyses, multivariable regression assessed direct and moderated effects; a mediation model assessed mediating effects. We used template analysis to assess qualitative data. We found support for each hypothesized relationship: Results suggest that top managers increase middle managers' commitment by directly conveying to middle managers that innovation implementation is an organizational priority (β = 0.37, p = .09); allocating implementation policies and practices including performance reviews, human resources, training, and funding (bootstrapped estimate for performance reviews = 0.09; 95% confidence interval [0.03, 0.17]); and encouraging middle managers to leverage performance reviews and human resources to achieve innovation implementation. Top managers can demonstrate their support directly by conveying to middle managers that an initiative is an organizational priority, allocating implementation policies and practices such as human resources and funding to facilitate innovation implementation, and convincing middle managers that innovation implementation is possible using available implementation policies and practices. Middle managers may maximize the influence of top managers' support on their commitment by communicating with top

  14. Purposeful Sampling for Qualitative Data Collection and Analysis in Mixed Method Implementation Research.

    Science.gov (United States)

    Palinkas, Lawrence A; Horwitz, Sarah M; Green, Carla A; Wisdom, Jennifer P; Duan, Naihua; Hoagwood, Kimberly

    2015-09-01

    Purposeful sampling is widely used in qualitative research for the identification and selection of information-rich cases related to the phenomenon of interest. Although there are several different purposeful sampling strategies, criterion sampling appears to be used most commonly in implementation research. However, combining sampling strategies may be more appropriate to the aims of implementation research and more consistent with recent developments in quantitative methods. This paper reviews the principles and practice of purposeful sampling in implementation research, summarizes types and categories of purposeful sampling strategies and provides a set of recommendations for use of single strategy or multistage strategy designs, particularly for state implementation research.

  15. Purposeful sampling for qualitative data collection and analysis in mixed method implementation research

    Science.gov (United States)

    Palinkas, Lawrence A.; Horwitz, Sarah M.; Green, Carla A.; Wisdom, Jennifer P.; Duan, Naihua; Hoagwood, Kimberly

    2013-01-01

    Purposeful sampling is widely used in qualitative research for the identification and selection of information-rich cases related to the phenomenon of interest. Although there are several different purposeful sampling strategies, criterion sampling appears to be used most commonly in implementation research. However, combining sampling strategies may be more appropriate to the aims of implementation research and more consistent with recent developments in quantitative methods. This paper reviews the principles and practice of purposeful sampling in implementation research, summarizes types and categories of purposeful sampling strategies and provides a set of recommendations for use of single strategy or multistage strategy designs, particularly for state implementation research. PMID:24193818

  16. 15 CFR 921.32 - Operation and management: Implementation of the management plan.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Operation and management... Reserve Designation and Subsequent Operation § 921.32 Operation and management: Implementation of the... funds to assist the state in the operation and management of the Reserve including the management of...

  17. Design and Implementation of an ASON Management System

    Institute of Scientific and Technical Information of China (English)

    2003-01-01

    According to current management requirements, an ASON management information model and system architecture using CORBA and Java are proposed. A test platform is implemented to demonstrate multi-domain, connection and control plane management.

  18. Implementation of the Quality Management System in the telecommunications companies

    OpenAIRE

    Menshikova Ekaterina; Khazanov Oleg; Styazhkin Mark

    2016-01-01

    This article describes the advantages of the implementing of the quality management system based on ISO 9001 in the telecommunications companies. The stages of the implementation of the quality management system in the telecommunications companies are discussed. The map of the main process and criteria of processes is developed. The expediency of implementing the quality management system based on the requirements of ISO 9001 in Telecommunications is showed.

  19. Demand management implementation in Southeast Asia

    Energy Technology Data Exchange (ETDEWEB)

    Tanaboriboon, Y.

    1995-12-31

    The need to apply transportation system management, to developing countries is urgent. Attempts to alleviate severe traffic congestion in their metropolises have so far failed to provide adequate solutions. The countries are faced with many difficulties because of the lack of sufficient financial resources together with their complex internal administrative and political problems. They are incapable of providing sufficient road space to cope with the escalating demand in private automobiles. This has led to excessive delays in urban traveling, environmental pollution problems, decline of road-based public transit services and deterioration of the quality of life in these metropolises. Demand management, in use for decades in the Western world, has also been recognized in Singapore`s famous area licensing scheme (ALS) making other Southeast Asian Metropolises aware of its advantages as an alternative in solving their chaotic traffic problems. However, realization is far different from implementation and still many metropolises are not able to apply the technique. Singapore and Thailand, two leaders among many other Southeast Asian regions in economics, tourism, trade and industry handle their problems far differently, especially the traffic congestion problem. While a number of demand management schemes have been implemented successfully in Singapore since 1975, Bangkok is still struggling to implement such measures to alleviate severe traffic congestion problems. This article intends to high light the successful practices and unsuccessful attempts of demand management techniques applied in Singapore and Bangkok.

  20. System for Earth Sample Registration SESAR: Services for IGSN Registration and Sample Metadata Management

    Science.gov (United States)

    Chan, S.; Lehnert, K. A.; Coleman, R. J.

    2011-12-01

    through web services. Based on valuable feedback from the user community, we will introduce enhancements that add greater flexibility to the system to accommodate the vast diversity of metadata that users want to store. Users will be able to create custom metadata fields and use these for the samples they register. Users will also be able to group samples into 'collections' to make retrieval for research projects or publications easier. An improved interface design will allow for better workflow transition and navigation throughout the application. In keeping up with the demands of a growing community, SESAR has also made process changes to ensure efficiency in system development. For example, we have implemented a release cycle to better track enhancements and fixes to the system, and an API library that facilitates reusability of code. Usage tracking, metrics and surveys capture information to guide the direction of future developments. A new set of administrative tools allows greater control of system management.

  1. SME's Implementing a Quality Management System- Risks and Opportunities

    Directory of Open Access Journals (Sweden)

    Luise ZEININGER

    2017-12-01

    Full Text Available Part of our daily lives, risk ceased to be just something that managers are desperate to alleviate if not eliminate. It is now rightfully considered a path to explore new opportunities. The last version of the ISO 9001, the 2015 edition, is asking from organization implementing it to determine the risk and opportunities associated with their main processes, the impact over relevant third parties and the context, both internal and external. With this duality as starting point, we have investigated among SME's implementing a quality management system what would they consider to be the risk and opportunities associated to this action. Our paper presents hereinafter the partial results of a wider study on Romanian SME's management, especially the findings related to what managers consider as risk or opportunity when implementing a quality management system.

  2. Development and implementation of integrated management system

    International Nuclear Information System (INIS)

    Tomov, E.; Nenkova, B.

    2013-01-01

    Risk Engineering Ltd is a private Bulgarian company in the field of scientific technical consultancy and engineering services, established in 1990. The aim of this report is to present the experience of Risk Engineering Ltd. in the development, implementation and operation of an integrated management system. The process of implementation of the system was completed at the end of 2011. In January 2012, the Risk Engineering Integrated Management System was certified by Lloyd's Register for compliance with standards ISO 9001:2008, ISO 140001:2004 and BS OHSAS 18001:2007

  3. Critical success factors for implementing risk management systems in developing countries

    Directory of Open Access Journals (Sweden)

    M.Reza Hosseini

    2016-03-01

    Full Text Available A review of published studies on risk management in developing countries reveals that critical success factors for implementing risk management has remained an under-researched area of investigation. This paper is aimed at investigating the perceptions of construction professionals concerning the critical success factors (CSFs for implementation of risk management systems (IRMS. Survey data was collected from 87 construction professionals from the Iranian construction industry as a developing country. The results indicate that four factors are regarded as highly critical: ‘support from managers’, ‘inclusion of risk management in construction education and training courses for construction practitioners’, ‘attempting to deliver projects systematically’, and ‘awareness and knowledge of the process for implementing risk management’. Assessing the associations among CSFs also highlighted the crucial role of enhancing the effectiveness of knowledge management practices in construction organisations. Study also revealed that parties involved in projects do not agree on the level of importance of CSFs for implementing risk management in developing countries. This study contributes to practice and research in several ways. For practice, it increases understanding of how closely knowledge management is associated with the implementation of risk management systems in developing countries. For research, the findings would encourage construction practitioners to support effective knowledge management as a precursor to higher levels of risk management implementation on construction projects.

  4. CORPORATIVE MOTIVES ON IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEM (IMS

    Directory of Open Access Journals (Sweden)

    Dragan Rajkovic

    2009-09-01

    Full Text Available Integration of management systems for quality, environment, health and risk management as well as corporative social responsibilities is workable corporative approach to reduce costs, effective use of resources, higher motivation of employees and better fulfillment of requirements of social engagements and stakeholders. This paper presents contents of literature and review of a company motives on integrated management system (IMS implementation, namely factors affecting the IMS implementation.

  5. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    International Nuclear Information System (INIS)

    Heinemann, J.L.; Millard, G.E.

    1997-08-01

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP

  6. Configuration management: Phase II implementation guidance

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    Configuration management (CM) is essential to maintaining an acceptable level of risk to the public, workers, environment, or mission success. It is a set of activities and techniques used to maintain consistency among physical and functional configuration, applicable requirements, and key documents. This document provides guidance for continuing the implementation of CM in a phased and graded manner. It describes a cost-effective approach to documented consistency with requirements, with early emphasis on items most important to safety and environmental protection. It is intended to help responsible line managers and configuration management staff personnel in meeting the Energy Systems configuration management policy standard.

  7. Itinerary implementation of an environmental management system and its benefits

    OpenAIRE

    Căpuşneanu, Sorinel/I; Martinescu (Oprea), Dana Maria/G

    2010-01-01

    This article treats the problem of environmental management system starting from definition and objectives stipulated according to ISO 14001. The success of implementation of the environmental management system consists in respecting its principles. It is described the role of employers' organizations in promoting environmental management systems. Also, there are described the implementation stages of an environmental management system in Romania. Each unrolled stage is synthesized and argued...

  8. Accounting Information Systems Implementation and Management Accounting Change

    Directory of Open Access Journals (Sweden)

    Bredmar Krister

    2014-09-01

    Full Text Available Background: There is an on-going discussion within management accounting research regarding how to work with performance measures. In the process of developing new forms of performance measurement the task of choosing business metrics is central. This process is closely connected to the implementation of IT solutions. Objectives: In order to understand how new performance measurement solutions are implemented and used, it becomes crucial to understand how measures are selected and how new accounting information systems (AIS are developed and implemented. Methods/approach: The paper builds on the case of an on-going AIS project at a large, public university in Sweden. The empirical material was collected using a semi-action research approach over a two-year period. The majority of the material comes from written documentation and minutes. Results: Even though the implementation of a new AIS triggers a change in the management accounting practice, this study shows that this is done in more than one perspective. Conclusions: As the project develops, new priorities and objectives evolve, which in the end shape what management accounting change becomes.

  9. STRATEGY IMPLEMENTATION STYLES OF MALAYSIAN, THAI AND HUNGARIAN MIDDLE MANAGERS

    Directory of Open Access Journals (Sweden)

    Maheshkumar P. Joshi

    2004-01-01

    Full Text Available There is a need for more comparative empirical research that examines middle manager roles in strategic change. This paper reports a study of middle managers in two dynamic settings: the Asia/Pacific region – Malaysia and Thailand; and Central/Eastern Europe – Hungary. Results of 213 respondents across three countries indicate that middle managers from all three tend toward use of authoritarian management styles even in proactive strategic change situations. However, Hungarians are less likely to use these styles than Thai and Malaysian middle managers. For all three countries, managers with less work experience were found to have lower tendencies to use an authoritarian style of implementation. When top managers exhibit an aggressive strategic posture, middle-managers from all three countries are also less likely to use an authoritarian style.Firms that want to stay competitive in the global market place must continuously evolve by successfully accomplishing strategic change (Struckman & Yammarino 2003. Although senior managers are critical in leading the strategic change process, even the best-planned strategic changes will not achieve their full potential unless they are well implemented. Part of the strategic leadership responsibility, therefore, includes establishing a climate in which the organization's rank and file will experience both a positive attitude about change and the confidence to actively seek change opportunities (Kanter 2003. Research attention is bringing more insight into the important roles of middle-managers in this process of implementing strategic change (Balogun & Jenkins 2003; Floyd & Wooldridge, 1992, 1994; Wooldridge & Floyd 1990. Although there is little doubt that active support by middle managers is critical for the strategies to be well implemented (Guth & MacMillan 1986, there remain many important questions with regard to how middle managers participate in this process (Balogun 2003.The need for research

  10. THE QUALITY MANAGEMENT SYSTEM AT THE UNIVERSITY. PROBLEMS IN IMPLEMENTING

    Directory of Open Access Journals (Sweden)

    L. I. Nazina

    2014-01-01

    Full Text Available Summary. Beginning of the XXI century marked the active integration of Russia and the world community, including entry into the world educational space. The international activities of the leading universities of the country depends on the level of cooperation with foreign countries in the field of scientific and educational activities. Today topical issue recognition of the quality of Russian education abroad. One way to confirm this is the certification of the quality management system of the university. As long-term, mostly foreign experience, achieving the required level of quality and continue to improve the most productive is accomplished by implementing a quality management system in accordance with ISO 9000. In the modern system of higher education a lot of attention paid to quality, to ensure the competitiveness of the institution in the education market by training qualified specialists. Implementation of the quality management system is to move the university to process management prepared in accordance with approved and enacted by the QMS documents. Workplaces should determine the duties, powers and responsibilities of each employee within the quality management system, develop and implement the job descriptions, staff verify documented procedures. Implementation of the certification must be accompanied by specific and persistent administration by management in conjunction with the training and retraining of all managers and employees involved in the work on the implementation of the QMS in the organization. This article describes the goals, objectives in the formation and implementation of QMS in higher education arising from this problem and barriers (information, methodological, psychological, multiple ways to address them.

  11. Cancer related fatigue: implementing guidelines for optimal management.

    Science.gov (United States)

    Pearson, Elizabeth J M; Morris, Meg E; McKinstry, Carol E

    2017-07-18

    Cancer-related fatigue (CRF) is a key concern for people living with cancer and can impair physical functioning and activities of daily living. Evidence-based guidelines for CRF are available, yet inconsistently implemented globally. This study aimed to identify barriers and enablers to applying a cancer fatigue guideline and to derive implementation strategies. A mixed-method study explored the feasibility of implementing the CRF guideline developed by the Canadian Association for Psychosocial Oncology (CAPO). Health professionals, managers and consumers from different practice settings participated in a modified Delphi study with two survey rounds. A reference group informed the design of the study including the surveys. The first round focused on guideline characteristics, compatibility with current practice and experience, and behaviour change. The second survey built upon and triangulated the first round. Forty-five health practitioners and managers, and 68 cancer survivors completed the surveys. More than 75% of participants endorsed the CAPO cancer related fatigue guidelines. Some respondents perceived a lack of resources for accessible and expert fatigue management services. Further barriers to guideline implementation included complexity, limited practical details for some elements, and lack of clinical tools such as assessment tools or patient education materials. Recommendations to enhance guideline applicability centred around four main themes: (1) balancing the level of detail in the CAPO guideline with ease of use, (2) defining roles of different professional disciplines in CRF management, (3) how best to integrate CRF management into policy and practice, (4) how best to ensure a consumer-focused approach to CRF management. Translating current knowledge on optimal management of CRF into clinical practice can be enhanced by the adoption of valid guidelines. This study indicates that it is feasible to adopt the CAPO guidelines. Clinical application may

  12. Wireless Sensor Networks Database: Data Management and Implementation

    Directory of Open Access Journals (Sweden)

    Ping Liu

    2014-04-01

    Full Text Available As the core application of wireless sensor network technology, Data management and processing have become the research hotspot in the new database. This article studied mainly data management in wireless sensor networks, in connection with the characteristics of the data in wireless sensor networks, discussed wireless sensor network data query, integrating technology in-depth, proposed a mobile database structure based on wireless sensor network and carried out overall design and implementation for the data management system. In order to achieve the communication rules of above routing trees, network manager uses a simple maintenance algorithm of routing trees. Design ordinary node end, server end in mobile database at gathering nodes and mobile client end that can implement the system, focus on designing query manager, storage modules and synchronous module at server end in mobile database at gathering nodes.

  13. TIME MANAGEMENT AND ITS IMPLEMENTATION AT PRODUCTION COMPANIES

    Directory of Open Access Journals (Sweden)

    Yurii Safonov

    2017-11-01

    Full Text Available The purpose and objectives. Time management is still not a very popular element in many enterprises, while its implementation significantly increases staff productivity and, ultimately, the effectiveness of the company. For this reason, the purpose of the article is to promote time management in a business environment by providing specific tools, principles, methods and systems, and to show its importance to the company and describe the influence of time management for the enterprise. Methods. The study used a generalization, systematization, empirical research, systematic and logical approach to the development of theoretical and methodological provisions for instrumental support management performance of the industrial enterprise. Results. Time management is one of the most important strategic tools of the modern manager. It can help both existing companies and companies that are just launched (the project. Practical implications. The current goal of time management as a mechanism to improve the efficiency of the company. Value/originality. To implement it, the company offered a popular time management system, allowing the company to increase the effectiveness of its activities.

  14. Risk, innovation and change : design propositions for implementing risk management in organizations

    NARCIS (Netherlands)

    van Staveren, Martinus Theodorus

    2009-01-01

    This Ph.D. research generated unique design propositions for implementing existing risk management methodologies in organizations. The resulting design propositions incorporate a synthesis of risk management, innovation management and change management. True implementation of risk management is

  15. Knowledge management implementation and the tools utilized in ...

    African Journals Online (AJOL)

    Knowledge management implementation and the tools utilized in healthcare for ... a knowledge driven process and thus knowledge management and the tools to ... health record systems, communities of practice and advanced care planning.

  16. Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

    Science.gov (United States)

    Brothers, Mary Ann; Safie, Fayssal M. (Technical Monitor)

    2002-01-01

    NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

  17. Extent of Implementing the Total Quality Management Principles by Academic Departments Heads at Najran University from Faculty Members' Perspectives

    Science.gov (United States)

    Al-Din, Hesham Moustafa Kamal; Abouzid, Mohamed Mahmoud

    2016-01-01

    This study aimed to identify the implementing degree of Total Quality Management (TQM) principals by Academic Departmental Heads (ADH) at the Najran University from faculty members' perspectives. It also aimed to determine significant differences between the average estimate of sample section of faculty members about the implementing degree of TQM…

  18. Quality Management Systems Implementation Compared With Organizational Maturity in Hospital.

    Science.gov (United States)

    Moradi, Tayebeh; Jafari, Mehdi; Maleki, Mohammad Reza; Naghdi, Seyran; Ghiasvand, Hesam

    2015-07-27

    A quality management system can provide a framework for continuous improvement in order to increase the probability of customers and other stakeholders' satisfaction. The test maturity model helps organizations to assess the degree of maturity in implementing effective and sustained quality management systems; plan based on the current realities of the organization and prioritize their improvement programs. We aim to investigate and compare the level of organizational maturity in hospitals with the status of quality management systems implementation. This analytical cross sectional study was conducted among hospital administrators and quality experts working in hospitals with over 200 beds located in Tehran. In the first step, 32 hospitals were selected and then 96 employees working in the selected hospitals were studied. The data were gathered using the implementation checklist of quality management systems and the organization maturity questionnaire derived from ISO 10014. The content validity was calculated using Lawshe method and the reliability was estimated using test - retest method and calculation of Cronbach's alpha coefficient. The descriptive and inferential statistics were used to analyze the data using SPSS 18 software. According to the table, the mean score of organizational maturity among hospitals in the first stage of quality management systems implementation was equal to those in the third stage and hypothesis was rejected (p-value = 0.093). In general, there is no significant difference in the organizational maturity between the first and third level hospitals (in terms of implementation of quality management systems). Overall, the findings of the study show that there is no significant difference in the organizational maturity between the hospitals in different levels of the quality management systems implementation and in fact, the maturity of the organizations cannot be attributed to the implementation of such systems. As a result, hospitals

  19. [The German program for disease management guidelines--implementation with pathways and quality management].

    Science.gov (United States)

    Ollenschläger, Günter; Lelgemann, Monika; Kopp, Ina

    2007-07-15

    In Germany, physicians enrolled in disease management programs are legally obliged to follow evidence-based clinical practice guidelines. That is why a Program for National Disease Management Guidelines (German DM-CPG Program) was established in 2002 aiming at implementation of best-practice evidence-based recommendations for nationwide as well as regional disease management programs. Against this background the article reviews programs, methods and tools for implementing DM-CPGs via clinical pathways as well as regional guidelines for outpatient care. Special reference is given to the institutionalized program of adapting DM-CPGs for regional use by primary-care physicians in the State of Hesse.

  20. Success Factors of Business Process Management Systems Implementation

    NARCIS (Netherlands)

    Johan Versendaal; J.P.P. Ravesteijn

    2007-01-01

    In this research (critical) success factors for Business Process Management Systems implementation are identified and qualitatively validated. Furthermore a list of critical success factors is constructed. Based on the identified factors a BPMS implementation approach is suggested. Future research

  1. Education management process implementation of reforms

    Directory of Open Access Journals (Sweden)

    A. V. Kondratyeva

    2013-12-01

    In the dissertation research looks at the problem of the study. This article contains material research and evaluate different points of view on the issue of a systematic approach using educational management in the implementation of reforms.

  2. Challenges to Successful Total Quality Management Implementation in Public Secondary Schools: A Case Study of Kohat District, Pakistan

    Science.gov (United States)

    Suleman, Qaiser; Gul, Rizwana

    2015-01-01

    The current study explores the challenges faced by public secondary schools in successful implementation of total quality management (TQM) in Kohat District. A sample of 25 heads and 75 secondary school teachers selected from 25 public secondary schools through simple random sampling technique was used. Descriptive research designed was used and a…

  3. Analysis of human tissue management models for medical research: preparation for implementation of the 2012 revision of the Bioethics and Safety Act of Korea.

    Science.gov (United States)

    Ryu, Young-Joon; Kim, Hankyeom; Jang, Sejin; Koo, Young-Mo

    2013-06-01

    Efficient management of human tissue samples is a critical issue; the supply of samples is unable to satisfy the current demands for research. Lack of informed consent is also an ethical problem. One of the goals of the 2012 revision of Korea's Bioethics and Safety Act was to implement regulations that govern the management of human tissue samples. To remain competitive, medical institutions must prepare for these future changes. In this report, we review two tissue management models that are currently in use; model 1 is the most common system utilized by hospitals in Korea and model 2 is implemented by some of the larger institutions. We also propose three alternative models that offer advantages over the systems currently in use. Model 3 is a multi-bank model that protects the independence of physicians and pathologists. Model 4 utilizes a comprehensive single bioresource bank; although in this case, the pathologists gain control of the samples, which may make it difficult to implement. Model 5, which employs a bioresource utilization steering committee (BUSC), is viable to implement and still maintains the advantages of Model 4. To comply with the upcoming law, we suggest that physicians and pathologists in an institution should collaborate to choose one of the improved models of tissue management system that best fits for their situation.

  4. Implementation of an Enhanced Measurement Control Program for handling nuclear safety samples at WSRC

    International Nuclear Information System (INIS)

    Boler-Melton, C.; Holland, M.K.

    1991-01-01

    In the separation and purification of nuclear material, nuclear criticality safety (NCS) is of primary concern. The primary nuclear criticality safety controls utilized by the Savannah River Site (SRS) Separations Facilities involve administrative and process equipment controls. Additional assurance of NCS is obtained by identifying key process hold points where sampling is used to independently verify the effectiveness of production control. Nuclear safety measurements of samples from these key process locations provide a high degree of assurance that processing conditions are within administrative and procedural nuclear safety controls. An enhanced procedure management system aimed at making improvements in the quality, safety, and conduct of operation was implemented for Nuclear Safety Sample (NSS) receipt, analysis, and reporting. All procedures with nuclear safety implications were reviewed for accuracy and adequate detail to perform the analytical measurements safely, efficiently, and with the utmost quality. Laboratory personnel worked in a ''Deliberate Operating'' mode (a systematic process requiring continuous expert oversight during all phases of training, testing, and implementation) to initiate the upgrades. Thus, the effort to revise and review nuclear safety sample procedures involved a team comprised of a supervisor, chemist, and two technicians for each procedure. Each NSS procedure was upgraded to a ''Use Every Time'' (UET) procedure with sign-off steps to ensure compliance with each step for every nuclear safety sample analyzed. The upgrade program met and exceeded both the long and short term customer needs by improving measurement reliability, providing objective evidence of rigid adherence to program principles and requirements, and enhancing the system for independent verification of representative sampling from designated NCS points

  5. Earned Value Management (EVM) Implementation Handbook

    Science.gov (United States)

    Terrell, Stefanie M.; Richards, Brad W.

    2018-01-01

    The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

  6. Decoupling, re-Engaging: managing trust relationships in implementation projects

    DEFF Research Database (Denmark)

    Rose, Jeremy; Schlichter, Bjarne Rerup

    2012-01-01

    , and the complex demands of managing those fluctuations. We investigate evolving trust relationships in a longitudinal case analysis of a large Integrated Hospital System implementation for the Faroe Islands. Trust relationships suffered various breakdowns, but the project was able to recover and eventually meet...... its goals. Based on concepts from Giddens’ later work on modernity, we develop two approaches for managing dynamic trust relationships in implementation projects: decoupling and re-engaging.......An important aspect of the successful implementation of large information systems (such as ERP systems) is trust. These implementations impact the legitimate interests of many groups of stakeholders, and trust is a critical factor for success. Trust in the project is contingent upon many factors...

  7. Implementation of Knowledge Management as Process to Management System of ÚJD SR

    International Nuclear Information System (INIS)

    Szabó, V.

    2016-01-01

    Full text: This presentation provides basic information about the development of staff’s knowledge management of Nuclear Regulatory Authority of Slovak Republic. It is a case study about implementation of knowledge management as process to the integrated management system for Slovak regulatory body. (author

  8. iLead-a transformational leadership intervention to train healthcare managers' implementation leadership.

    Science.gov (United States)

    Richter, Anne; von Thiele Schwarz, Ulrica; Lornudd, Caroline; Lundmark, Robert; Mosson, Rebecca; Hasson, Henna

    2016-07-29

    Leadership is a key feature in implementation efforts, which is highlighted in most implementation frameworks. However, in studying leadership and implementation, only few studies rely on established leadership theory, which makes it difficult to draw conclusions regarding what kinds of leadership managers should perform and under what circumstances. In industrial and organizational psychology, transformational leadership and contingent reward have been identified as effective leadership styles for facilitating change processes, and these styles map well onto the behaviors identified in implementation research. However, it has been questioned whether these general leadership styles are sufficient to foster specific results; it has therefore been suggested that the leadership should be specific to the domain of interest, e.g., implementation. To this end, an intervention specifically involving leadership, which we call implementation leadership, is developed and tested in this project. The aim of the intervention is to increase healthcare managers' generic implementation leadership skills, which they can use for any implementation efforts in the future. The intervention is conducted in healthcare in Stockholm County, Sweden, where first- and second-line managers were invited to participate. Two intervention groups are included, including 52 managers. Intervention group 1 consists of individual managers, and group 2 of managers from one division. A control group of 39 managers is additionally included. The intervention consists of five half-day workshops aiming at increasing the managers' implementation leadership, which is the primary outcome of this intervention. The intervention will be evaluated through a mixed-methods approach. A pre- and post-design applying questionnaires at three time points (pre-, directly after the intervention, and 6 months post-intervention) will be used, in addition to process evaluation questionnaires related to each workshop. In

  9. Evaluating the effectiveness of implementing quality management practices in the medical industry.

    Science.gov (United States)

    Yeh, T-M; Lai, H-P

    2015-01-01

    To discuss the effectiveness of 30 quality management practices (QMP) including Strategic Management, Balanced ScoreCard, Knowledge Management, and Total Quality Management in the medical industry. A V-shaped performance evaluation matrix is applied to identify the top ten practices that are important but not easy to use or implement. Quality Function Deployment (QFD) is then utilized to find key factors to improve the implementation of the top ten tools. The questionnaires were sent to the nursing staff and administrators in a hospital through e-mail and posts. A total of 250 copies were distributed and 217 copies were valid. The importance, easiness, and achievement (i.e., implementation level) of 30 quality management practices were used. Key factors for QMP implementation were sequenced in order of importance as top management involvement, inter-department communication and coordination, teamwork, hospital-wide participation, education and training, consultant professionalism, continuous internal auditing, computerized process, and incentive compensation. Top management can implement the V-shaped performance matrix to determine whether quality management practices need improvement and if so, utilize QFD to find the key factors for improvement.

  10. A case study of polypharmacy management in nine European countries: Implications for change management and implementation.

    Science.gov (United States)

    McIntosh, Jennifer; Alonso, Albert; MacLure, Katie; Stewart, Derek; Kempen, Thomas; Mair, Alpana; Castel-Branco, Margarida; Codina, Carles; Fernandez-Llimos, Fernando; Fleming, Glenda; Gennimata, Dimitra; Gillespie, Ulrika; Harrison, Cathy; Illario, Maddalena; Junius-Walker, Ulrike; Kampolis, Christos F; Kardas, Przemyslaw; Lewek, Pawel; Malva, João; Menditto, Enrica; Scullin, Claire; Wiese, Birgitt

    2018-01-01

    Multimorbidity and its associated polypharmacy contribute to an increase in adverse drug events, hospitalizations, and healthcare spending. This study aimed to address: what exists regarding polypharmacy management in the European Union (EU); why programs were, or were not, developed; and, how identified initiatives were developed, implemented, and sustained. Change management principles (Kotter) and normalization process theory (NPT) informed data collection and analysis. Nine case studies were conducted in eight EU countries: Germany (Lower Saxony), Greece, Italy (Campania), Poland, Portugal, Spain (Catalonia), Sweden (Uppsala), and the United Kingdom (Northern Ireland and Scotland). The workflow included a review of country/region specific polypharmacy policies, key informant interviews with stakeholders involved in policy development and implementation and, focus groups of clinicians and managers. Data were analyzed using thematic analysis of individual cases and framework analysis across cases. Polypharmacy initiatives were identified in five regions (Catalonia, Lower Saxony, Northern Ireland, Scotland, and Uppsala) and included all care settings. There was agreement, even in cases without initiatives, that polypharmacy is a significant issue to address. Common themes regarding the development and implementation of polypharmacy management initiatives were: locally adapted solutions, organizational culture supporting innovation and teamwork, adequate workforce training, multidisciplinary teams, changes in workflow, redefinition of roles and responsibilities of professionals, policies and legislation supporting the initiative, and data management and information and communication systems to assist development and implementation. Depending on the setting, these were considered either facilitators or barriers to implementation. Within the studied EU countries, polypharmacy management was not widely addressed. These results highlight the importance of change

  11. Environmental Management Systems (EMS Adoption in Sarawak (Malaysia: Implementation Motivations

    Directory of Open Access Journals (Sweden)

    Lee Lee Ho

    2017-09-01

    Full Text Available Environmental management has been in the process of evolution since Industrial Revolutions of 18th and 19th centuries. And the more recent is the development of international environmental management standards and guidelines to facilitate global trade. These environmental management standards and guidelines are usually known as Environmental Management Systems (EMS. This research investigates the implementation motivations in relation to EMS adoption in Sarawak, Malaysia organizations. Empirical findings of a survey on the above in Sarawak organizations are presented. About 112 survey questionnaires invitations were forwarded to various organizations in Sarawak and a total of 47 responses were received. The results of this research show that among the Sarawak organizations, the top three implementation motivations or benefits from implementing EMS according to their importance by the Sarawak EMS user’s organizations are 1 Legal compliance as the top benefit of EMS implementation; 2 Improvement in operational environmental protection; and 3 Corporate image advantages.

  12. Understanding barriers to implementation of an adaptive land management program

    Science.gov (United States)

    Jacobson, S.K.; Morris, J.K.; Sanders, J.S.; Wiley, E.N.; Brooks, M.; Bennetts, R.E.; Percival, H.F.; Marynowski, S.

    2006-01-01

    The Florida Fish and Wildlife Conservation Commission manages over 650,000 ha, including 26 wildlife management and environmental areas. To improve management, they developed an objective-based vegetation management (OBVM) process that focuses on desired conditions of plant communities through an adaptive management framework. Our goals were to understand potential barriers to implementing OBVM and to recommend strategies to overcome barriers. A literature review identified 47 potential barriers in six categories to implementation of adaptive and ecosystem management: logistical, communication, attitudinal, institutional, conceptual, and educational. We explored these barriers through a bureau-wide survey of 90 staff involved in OBVM and personal interviews with area managers, scientists, and administrators. The survey incorporated an organizational culture assessment instrument to gauge how institutional factors might influence OBVM implementation. The survey response rate was 69%. Logistics and communications were the greatest barriers to implementing OBVM. Respondents perceived that the agency had inadequate resources for implementing OBVM and provided inadequate information. About one-third of the respondents believed OBVM would decrease their job flexibility and perceived greater institutional barriers to the approach. The 43% of respondents who believed they would have more responsibility under OBVM also had greater attitudinal barriers. A similar percentage of respondents reported OBVM would not give enough priority to wildlife. Staff believed that current agency culture was hierarchical but preferred a culture that would provide more flexibility for adaptive management and would foster learning from land management activities. In light of the barriers to OBVM, we recommend the following: (1) mitigation of logistical barriers by addressing real and perceived constraints of staff, funds, and other resources in a participatory manner; (2) mitigation of

  13. Practitioner Perceptions of Adaptive Management Implementation in the United States

    Directory of Open Access Journals (Sweden)

    Melinda Harm. Benson

    2013-09-01

    Full Text Available Adaptive management is a growing trend within environment and natural resource management efforts in the United States. While many proponents of adaptive management emphasize the need for collaborative, iterative governance processes to facilitate adaptive management, legal scholars note that current legal requirements and processes in the United States often make it difficult to provide the necessary institutional support and flexibility for successful adaptive management implementation. Our research explores this potential disconnect between adaptive management theory and practice by interviewing practitioners in the field. We conducted a survey of individuals associated with the Collaborative Adaptive Management Network (CAMNet, a nongovernmental organization that promotes adaptive management and facilitates in its implementation. The survey was sent via email to the 144 participants who attended CAMNet Rendezvous during 2007-2011 and yielded 48 responses. We found that practitioners do feel hampered by legal and institutional constraints: > 70% of respondents not only believed that constraints exist, they could specifically name one or more examples of a legal constraint on their work implementing adaptive management. At the same time, we found that practitioners are generally optimistic about the potential for institutional reform.

  14. Implementation of a unified system for waste management

    International Nuclear Information System (INIS)

    Silva, Eliane Magalhaes Pereira da

    2006-08-01

    The process of generation and disposal of wastes has been responsible for many economical, ecological and public health problems, although the importance of its safe management for the protection of human health and the environment has long been recognized. In order to manage the hazardous wastes in an environmentally-friendly manner, many technical and administrative procedures should be implemented, from prevention and control of waste generation to a final disposal. The nuclear area personnel have a long and successful experience in all administrative and operational activities involved in the handling, treatment, conditioning, transport, storage and disposal of radioactive waste. Thus, this knowledge can be considered in the development of a unified methodology for managing all kinds of hazardous waste. The main purpose of the present work is to develop and implement a methodology, primarily to institutions that generate small amounts of waste of different compositions, on the predisposal activities management. This methodology was developed to provide a facilitator tool that should be applied by expert users. To simplify and automatize its application, a software, named SUGERE - a unified system for waste management, was developed in a Windows R environment using a Borland Delphi R package. The nuclear industry was used as a reference for developing this work and many examples of this area standards and procedures are implemented. (author)

  15. Assessment and management of burn pain at the Komfo Anokye Teaching Hospital: a best practice implementation project.

    Science.gov (United States)

    Bayuo, Jonathan; Munn, Zachary; Campbell, Jared

    2017-09-01

    Pain management is a significant issue in health facilities in Ghana. For burn patients, this is even more challenging as burn pain has varied facets. Despite the existence of pharmacological agents for pain management, complaints of pain still persist. The aim of this project was to identify pain management practices in the burns units of Komfo Anokye Teaching Hospital, compare these approaches to best practice, and implement strategies to enhance compliance to standards. Ten evidence-based audit criteria were developed from evidence summaries. Using the Joanna Briggs Institute Practical Application of Clinical Evidence Software (PACES), a baseline audit was undertaken on a convenience sample of ten patients from the day of admission to the seventh day. Thereafter, the Getting Research into Practice (GRiP) component of PACES was used to identify barriers, strategies, resources and outcomes. After implementation of the strategies, a follow-up audit was undertaken using the same sample size and audit criteria. The baseline results showed poor adherence to best practice. However, following implementation of strategies, including ongoing professional education and provision of assessment tools and protocols, compliance rates improved significantly. Atlhough the success of this project was almost disrupted by an industrial action, collaboration with external bodies enabled the successful completion of the project. Pain management practices in the burns unit improved at the end of the project which reflects the importance of an audit process, education, providing feedback, group efforts and effective collaboration.

  16. Implementation of a management system for operating organizations of research reactors

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Aquino, Afonso Rodrigues de; Zouain, Desiree Moraes

    2011-01-01

    This paper presents the requirements established by an IAEA draft technical document for the implementation of a management system for operating organisations of research reactors. The following aspects will be discussed: structure of IAEA draft technical document, management system requirements, processes common to all research reactors, aspects for the implementation of the management system, and a formula for grading the management system requirements. (author)

  17. Implementation of a management system for operating organizations of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kibrit, Eduardo, E-mail: kibrit@ctmsp.mar.mil.b [Centro Tecnologico da Marinha em Sao Paulo (CTMSP), Sao Paulo, SP (Brazil); Aquino, Afonso Rodrigues de; Zouain, Desiree Moraes, E-mail: araquino@ipen.b, E-mail: dmzouain@ipen.b [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2011-07-01

    This paper presents the requirements established by an IAEA draft technical document for the implementation of a management system for operating organisations of research reactors. The following aspects will be discussed: structure of IAEA draft technical document, management system requirements, processes common to all research reactors, aspects for the implementation of the management system, and a formula for grading the management system requirements. (author)

  18. Harvest Regulations and Implementation Uncertainty in Small Game Harvest Management

    Directory of Open Access Journals (Sweden)

    Pål F. Moa

    2017-09-01

    Full Text Available A main challenge in harvest management is to set policies that maximize the probability that management goals are met. While the management cycle includes multiple sources of uncertainty, only some of these has received considerable attention. Currently, there is a large gap in our knowledge about implemention of harvest regulations, and to which extent indirect control methods such as harvest regulations are actually able to regulate harvest in accordance with intended management objectives. In this perspective article, we first summarize and discuss hunting regulations currently used in management of grouse species (Tetraonidae in Europe and North America. Management models suggested for grouse are most often based on proportional harvest or threshold harvest principles. These models are all built on theoretical principles for sustainable harvesting, and provide in the end an estimate on a total allowable catch. However, implementation uncertainty is rarely examined in empirical or theoretical harvest studies, and few general findings have been reported. Nevertheless, circumstantial evidence suggest that many of the most popular regulations are acting depensatory so that harvest bag sizes is more limited in years (or areas where game density is high, contrary to general recommendations. A better understanding of the implementation uncertainty related to harvest regulations is crucial in order to establish sustainable management systems. We suggest that scenario tools like Management System Evaluation (MSE should be more frequently used to examine robustness of currently applied harvest regulations to such implementation uncertainty until more empirical evidence is available.

  19. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  20. Critical success factors in implementing clinical pathways/case management.

    Science.gov (United States)

    Choo, J

    2001-07-01

    With the advent of casemix reimbursement implementation, rapid technological changes, an ageing population and changing consumer behaviour, the Singapore health care industry is faced with the impetus to provide a cost-effective and efficient care delivery system. One ubiquitous tool used is the establishment of a clinical pathway/case management programme within the hospital. As the concept of clinical pathway for patient care is a relatively new concept in Singapore, several critical factors must be considered to ensure successful implementation of clinical pathway/case management programme. One key success factor lies in continued clinician support and acceptance. Other factors include top management leadership and support and a dedicated team of case managers, nurses and paramedical professionals.

  1. The impact of middle manager affective commitment on perceived improvement program implementation success.

    Science.gov (United States)

    Fryer, Ashley-Kay; Tucker, Anita L; Singer, Sara J

    Recent literature suggests that middle manager affective commitment (emotional attachment, identification, and involvement) to an improvement program may influence implementation success. However, less is known about the interplay between middle manager affective commitment and frontline worker commitment, another important driver of implementation success. We contribute to this research by surveying middle managers who directly manage frontline workers on nursing units. We assess how middle manager affective commitment is related to their perceptions of implementation success and whether their perceptions of frontline worker support mediate this relationship. We also test whether a set of organizational support factors foster middle manager affective commitment. We adapt survey measures of manager affective commitment to our research context of hospitals. We surveyed 67 nurse managers from 19 U.S. hospitals. We use hierarchical linear regression to assess relationships among middle manager affective commitment to their units' falls reduction program and their perceptions of three constructs related to the program: frontline worker support, organizational support, and implementation success. Middle manager affective commitment to their unit's falls reduction program is positively associated with their perception of implementation success. This relationship is mediated by their perception of frontline worker support for the falls program. Moreover, middle managers' affective commitment to their unit's falls program mediates the relationship between perceived organizational support for the program and perceived implementation success. We, through this research, offer an important contribution by providing empirical support of factors that may influence successful implementation of an improvement program: middle manager affective commitment, frontline worker support, and organizational support for an improvement program. Increasing levels of middle manager affective

  2. The nursing management of diarrhoea and constipation before and after the implementation of a bowel management protocol.

    Science.gov (United States)

    McKenna, S; Wallis, M; Brannelly, A; Cawood, J

    2001-02-01

    Intensive care unit (ICU) patients frequently suffer problems associated with both diarrhoea and constipation. Strategies to optimise the management of these conditions need to focus on improving the communication between staff and ensuring effective treatment is implemented. The team involved in this study developed a Bowel Management Protocol (BMP). The effect of this BMP on the documentation of assessment and management of diarrhoea and constipation was evaluated using a quasi-experimental research design. Data were collected via a retrospective audit of medical records. Two groups of patient records were randomly sampled. The records of 60 patients who were admitted to ICU in the 6 months before the introduction of the BMP were accessed together with the records of 60 patients admitted in the 6 months following the introduction of the BMP. Data were collected regarding patient demographics and the assessment and management of bowel function before and after BMP introduction. The results indicated that a BMP improved documentation of the assessment of bowel function. In addition, there was an improvement in the documentation of nursing intervention in the presence of constipation and diarrhoea. These results have to be interpreted with caution because, despite random sampling over two 6 month periods, there were statistically significant differences in age, length of stay, method of feeding and medical diagnosis between the two groups. Further research into the effectiveness of using a BMP is recommended.

  3. Increasing In-Service Teacher Implementation of Classroom Management Practices through Consultation, Implementation Planning, and Participant Modeling

    Science.gov (United States)

    Hagermoser Sanetti, Lisa M.; Williamson, Kathleen M.; Long, Anna C. J.; Kratochwill, Thomas R.

    2018-01-01

    Numerous evidence-based classroom management strategies to prevent and respond to problem behavior have been identified, but research consistently indicates teachers rarely implement them with sufficient implementation fidelity. The purpose of this study was to evaluate the effectiveness of implementation planning, a strategy involving logistical…

  4. Implementation of total responsibility management into corporate strategy

    OpenAIRE

    Gorenak, Štefka; Bobek, Vito

    2012-01-01

    This contribution reports about relationship and potential synergies between the total quality management (TQM) and total responsibility management (TRM) as well as corporate citizenship. TRM principles and standards reflect the raising public expectations about corporate social responsibility. Many companies develop TRM as requisitely holistically and hence successfully manage their responsibilities toward their stakeholders and natural environment. The evolution and implementation of TRM in...

  5. U.S. Department of Energy defense waste management program implementation plan

    International Nuclear Information System (INIS)

    Jordan, E.A.

    1988-01-01

    The Program Implementation Plan describes the Department of Energy's current approach to managing its defense high-level, low-level, and transuranic radioactive waste. It documents implementation of the policies described in the 1983 Defense Waste Management Plan

  6. Implementation of the Environmental Management System in Radioactive Waste Management

    International Nuclear Information System (INIS)

    Fabjan, M.; Kralj, M.; Rojc, J.

    2008-01-01

    Agency for Radwaste Management (ARAO) is a public institution assigned to provide effective, safe and responsible management of all kinds of radioactive waste in Slovenia from the moment they arise to their final disposal. Therefore it holds an important role in environmental protection. Its main assignment is to provide conditions for permanent disposal of radioactive waste. It is also authorised to perform public service of radioactive waste management from small producers that includes: collection of the waste from small producers at the producers' premises, transportation to the storage facility, treatment, conditioning storage of RW from small producers; acceptance of radioactive waste in case of emergency situation (e.g. transport accidents); acceptance of radioactive waste in case of unknown producer; operation and management of Central Interim Storage of Radioactive Waste. The quality of ARAO performance in carrying out its mission is assured by implementing the environmental management system according to the standard ISO 14001:2004. Its effectiveness was confirmed by certification in October 2007. The ISO 14001:2004 certificate represents a permanent commitment of ARAO to implement and improve the environmental management system and to include environmental aspects in all its activities, especially in performing the public service. We developed own evaluation criteria for determination of relevant environmental impacts and aspects. ARAO has defined its environmental policy and objectives, it evaluates its environmental impacts yearly, and defines its environmental programmes that not only fulfil legal requirements but tend even to reduce the impacts below legally set levels. A very important environmental programme in the last few years was the reconstruction of the storage facility. Public information and communication programmes are considered to be important also from the environmental management point of view, because public shows great interest in

  7. Management assessments of Quality Assurance Program implementation effectiveness

    International Nuclear Information System (INIS)

    Snyder, D.A.

    1984-01-01

    This paper describes a method currently being used by UNC Nuclear Industries, Richland, Washington, to help assure the effectiveness of Quality Assurance (QA) Program implementation. Assessments are conducted annually by management in each department, and the results summarized to the president and his staff. The purpose of these assessments is to review the adequacy of the department's implementing procedures, training/instruction on implementing procedures, and procedure implementation effectiveness. The primary purpose is to assess effectiveness and take improvement action where the need is indicated. The QA organization provides only general guidance in conducting the assessments

  8. Factors influencing implementation of integrated management of ...

    African Journals Online (AJOL)

    intern

    implementation of health facility based Integrated Management of Childhood Illness ... community-owned resource persons (CORPs) to provide health education to care ... differing coverage of basic essential services such safe water supply, ...

  9. U.S. Department of Energy, defense waste management program implementation plan

    International Nuclear Information System (INIS)

    Chee, T.

    1988-01-01

    This paper reports that the program implementation plan describes the Department of Energy's current approach to managing its defense high-level, low-level, and transuranic radioactive waste. It documents implementation of the policies described in the 1983 Defense Waste Management Plan

  10. Do Italian Companies Manage Work-Related Stress Effectively? A Process Evaluation in Implementing the INAIL Methodology.

    Science.gov (United States)

    Di Tecco, Cristina; Ronchetti, Matteo; Ghelli, Monica; Russo, Simone; Persechino, Benedetta; Iavicoli, Sergio

    2015-01-01

    Studies on Intervention Process Evaluation are attracting growing attention in the literature on interventions linked to stress and the wellbeing of workers. There is evidence that some elements relating to the process and content of an intervention may have a decisive role in implementing it by facilitating or hindering the effectiveness of the results. This study aimed to provide a process evaluation on interventions to assess and manage risks related to work-related stress using a methodological path offered by INAIL. The final sample is composed of 124 companies participating to an interview on aspects relating to each phase of the INAIL methodological path put in place to implement the intervention. INAIL methodology has been defined as useful in the process of assessing and managing the risks related to work-related stress. Some factors related to the process (e.g., implementation of a preliminary phase, workers' involvement, and use of external consultants) showed a role in significant differences that emerged in the levels of risk, particularly in relation to findings from the preliminary assessment. Main findings provide information on the key aspects of process and content that are useful in implementing an intervention for assessing and managing risks related to work-related stress.

  11. Do Italian Companies Manage Work-Related Stress Effectively? A Process Evaluation in Implementing the INAIL Methodology

    Science.gov (United States)

    Di Tecco, Cristina; Ronchetti, Matteo; Ghelli, Monica; Russo, Simone; Persechino, Benedetta

    2015-01-01

    Studies on Intervention Process Evaluation are attracting growing attention in the literature on interventions linked to stress and the wellbeing of workers. There is evidence that some elements relating to the process and content of an intervention may have a decisive role in implementing it by facilitating or hindering the effectiveness of the results. This study aimed to provide a process evaluation on interventions to assess and manage risks related to work-related stress using a methodological path offered by INAIL. The final sample is composed of 124 companies participating to an interview on aspects relating to each phase of the INAIL methodological path put in place to implement the intervention. INAIL methodology has been defined as useful in the process of assessing and managing the risks related to work-related stress. Some factors related to the process (e.g., implementation of a preliminary phase, workers' involvement, and use of external consultants) showed a role in significant differences that emerged in the levels of risk, particularly in relation to findings from the preliminary assessment. Main findings provide information on the key aspects of process and content that are useful in implementing an intervention for assessing and managing risks related to work-related stress. PMID:26504788

  12. Now's the Time: Implementing Performance Management

    Science.gov (United States)

    Legutko, Lee V.

    2012-01-01

    During the past several years, school systems have implemented a variety of organizational improvement initiatives, such as Six Sigma, Balanced Scorecards, Baldrige Criteria, activity-based costing, and managing for results. Unfortunately, evidence of sustained success is fleeting as school districts remain trapped in a time warp of command,…

  13. THE EXISTING BARRIERS IN IMPLEMENTING TOTAL QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Salagean Horatiu Catalin

    2014-07-01

    Full Text Available In the current market economy, companies are constantly struggling to achieve a sustained competitive advantage that will enable them to improve performance, which results in increased competitiveness, and of course, profit. Among the few competitive advantages that can become sustainable competitive advantages, quality plays a crucial role. Recent research shows that about 90% of buyers in the international market, consider quality as having at least equal importance with price in making the decision to purchase. In the opinion of some specialists in economic theory and practice, total quality refers to the holistic approach of quality, which actually means, addressing all aspects of economic and social development and technical of quality. Thus, the holistic approach of quality at organisation-wide involves procedural approach of quality, in this respect, the study focuses on this type of quality approach, i.e. the procedural approach, taking into account the strategic aspects of the continuous improvement of quality, which means in fact, the quality management. Total Quality Management is seen as a way to transform the economies of some countries to be more competitive than others. However, Total Quality Management brings not and will not produce results overnight, it is not a panacea for all the problems facing the organization. Total Quality Management requires a change in organizational culture, which must focus on meeting customer expectations and increasing the involvement of all employees to meet this objective, as an expression of the ethics of continuous improvement. In general, research on quality aiming identify why an organization should adopt the principles of total quality management, but attempts to identify the failing companies' attempts to implement total quality management principles are not so visible. Concerns companies to introduce quality management systems are becoming more pronounced, therefore, in this study we try to

  14. Plant specific severe accident management - the implementation phase

    International Nuclear Information System (INIS)

    Prior, R.

    1999-01-01

    Many plants are in the process of developing on-site guidance for technical staff to respond to a severe accident situation severe accident management guidance (SAMG). Once the guidance is developed, the SAMG must be implemented at the plant site, and this involves addressing a number of additional aspects. In this paper, approaches to this implementation phase are reviewed, including review and verification of plant specific SAMG, organizational aspects and integration with the emergency plan, training of SAMG users, validation and self-assessment and SAMG maintenance. Examples draw on experience from assisting numerous plants to implement symptom based severe accident management guidelines based on the Westinghouse Owners Group approach, in Westinghouse, non-Westinghouse and VVER plant types. It is hoped that it will be of use to those plant operators about to perform these activities.(author)

  15. Lean process management implementation through enhanced problem solving capabilities

    Directory of Open Access Journals (Sweden)

    Perumal Puvanasvaran

    2010-12-01

    Full Text Available All Original Equipment Manufacturers (OEM organizations in Aerospace, Automotive and Electronics industries had to upgrade their functions. These organizations including suppliers and solutions providers are duty bound to improve their functions through strategic initiatives. One such initiative is Lean Process Management. Lean Process Management has proven to aid organizations in developing manufacturing and administrative management solutions and make the organization a leaner at the same time a ‘fitter’ one, achieving World Class standards in terms of production, quality, marketing, etc, etc. The issue or problem is, although a number of authors, experts, researchers have discussed the lean process management as part organization centric issues, they failed to provide an effective lean process management system. Besides the need to formulate an effective lean process as suggested by some authors, another important reason suggested is the employee’s development aspect regarding how to unlock the infinite potential of their workforce. This employee’s development is basically the problem solving capabilities of the employees while implementing the Lean through clear cutting protocols or processes of Lean Process Management. The employees need to be developed and equipped to contribute optimally to the process. Because of this scenario, the main objective of this study is to develop an employees development system which the author has acronym or trademark it as People Development System (PDS to enhance problem solving capability among its employees while implementing the lean process management there. Although, the PDS can be implemented throughout the organization, if it is implemented in a particular department in an organization, it will be feasible to study and analyze its effectiveness in-depth. So, this study documents and analyzes the implementation of Lean process in the Kitting Department of the aerospace company, ABC Company

  16. Change Management as a Critical Success Factor in e-Government Implementation

    Directory of Open Access Journals (Sweden)

    Janja Nograšek

    2011-01-01

    Full Text Available Change management in e-government implementation is a very complex issue. E-government services are frequently distributed over different IT systems and organizations. There are also events from outside the public administration that cause changes such as government policies and legislation, public-private partnership, etc., and finally a huge resistance to change exists in public administration proverbial. Another problem is that the e-government is predominantly seen only as a technology mission and not as an organizational transformation issue. Those are probably the main reasons that the existing literature about change management in e-government is still missing at large. There are articles dealing with some aspects of changes affected by the new technology implementation, however, there is no comprehensive framework that would identify changes that have to be managed in e-government implementation. Therefore, the main aim of the paper is to identify a comprehensive set of changes that have to be considered in e-government implementation and the role of leadership in such processes. Finally, the paper proposes a conceptual model of change management in e-government implementation.

  17. MANAGING THE INTERACTION OF RESOURCE DISTRIBUTION IN PROJECT MANAGEMENT OF IMPLEMENTATION AND FUNCTIONING OF EMERGENCY CALL SYSTEMS

    Directory of Open Access Journals (Sweden)

    Дмитро Сергійович КОБИЛКІН

    2016-02-01

    Full Text Available There have been proposed to use a mobile module "Resources manager" and its component model – scheme for managing the distribution of resources during the project management of implementation and functioning of System 112 in Ukraine. Are described the formalized tasks of performance the processes of managing the model – scheme at all stages of the projects life cycle. Also is developed the model – scheme interaction the blocks of the mobile module of resource management at the System 112 project. It describes the step by step interaction of blocks project management with the project data for successful project implementation and obtaining a product of the project, pointing out the environmental impact of the project on each of the project blocks. The conclusions about the expediency and efficiency of implementation of model – scheme in conditions of managing the emergency call systems at a single number were made.

  18. Implementation of e-Supply Chain Management

    Directory of Open Access Journals (Sweden)

    Lidija Pulevska-Ivanovska

    2013-11-01

    Full Text Available The development and evolution of the Internet and information technology have transformed the traditional way of working into electronic management and operation, opening new opportunities and strategic possibilities. This paper offers deep understanding of the electronic supply chain management concept, by giving insight into the nature of e-SCM and the opportunities that the information technologies are providing. Also, through analysis of real world examples of organizations that have implemented e-SCM, this paper exploits and examines the benefits and advantages to these organizations in building a sustainable competitive advantage.

  19. School Based Management: A Detailed Guide for Successful Implementation.

    Science.gov (United States)

    Neal, Richard G.

    This book examines school-based management and provides strategies to implement management changes. The 14 chapters examine the components of good schools, including clarity of purpose, leadership, professionalism, lack of bureaucratic control, competition, and choice. The text describes the components of school-based management and the need for…

  20. Practical iterative learning control with frequency domain design and sampled data implementation

    CERN Document Server

    Wang, Danwei; Zhang, Bin

    2014-01-01

    This book is on the iterative learning control (ILC) with focus on the design and implementation. We approach the ILC design based on the frequency domain analysis and address the ILC implementation based on the sampled data methods. This is the first book of ILC from frequency domain and sampled data methodologies. The frequency domain design methods offer ILC users insights to the convergence performance which is of practical benefits. This book presents a comprehensive framework with various methodologies to ensure the learnable bandwidth in the ILC system to be set with a balance between learning performance and learning stability. The sampled data implementation ensures effective execution of ILC in practical dynamic systems. The presented sampled data ILC methods also ensure the balance of performance and stability of learning process. Furthermore, the presented theories and methodologies are tested with an ILC controlled robotic system. The experimental results show that the machines can work in much h...

  1. Development and Implementation of Integrated Pest Management in ...

    African Journals Online (AJOL)

    Nafiisah

    This paper reviews the status of Integrated Pest Management (IPM) research in. Mauritius and also reports on the successful cases of IPM implementation during ... Tool. Activity. Status. Source. Biological control. Introduce parasitoids .... 10 g sugar in 1 L of water) in plastic bottles as one option to manage fruit flies in.

  2. Design and Implementation of a Management Control System

    Directory of Open Access Journals (Sweden)

    Anca Antoaneta VĂRZARU

    2015-09-01

    Full Text Available This paper tries to implement a management control system to raise the performance of a company with the objective to define and align to the entire organization toward a common strategy and sustainable for all. Information was collected from the major critical issues in order to detect the key sectors of the company where a change is needed. It was established the strategy to be followed and defined management indicators that allowed monitor and validate the implementation of the strategy through the Control Panel and strategic initiatives. Four initiatives were developed to understand the effect that has the control system in the management of the company generating positive results observed in the analysis of results. In order to maintain the strategy was necessary to develop audit reports to permanently check the system status.

  3. Implementation of the affordable care act: a case study of a service line co-management company.

    Science.gov (United States)

    Lanese, Bethany

    2016-09-19

    Purpose The purpose of this paper is to test and measure the outcome of a community hospital in implementing the Affordable Care Act (ACA) through a co-management arrangement. RQ1: do the benefits of a co-management arrangement outweigh the costs? RQ2: does physician alignment aid in the effective implementation of the ACA directives set for hospitals? Design/methodology/approach A case study of a 350-bed non-profit community hospital co-management company. The quantitative data are eight quarters of quality metrics prior and eight quarters post establishment of the co-management company. The quality metrics are all based on standardized national requirements from the Joint Commission and Centers for Medicare and Medicaid Services guidelines. These measures directly impact the quality initiatives under the ACA that are applicable to all healthcare facilities. Qualitative data include survey results from hospital employees of the perceived effectiveness of the co-management company. A paired samples difference of means t-test was conducted to compare the timeframe before co-management and post co-management. Findings The findings indicate that the benefits of a co-management arrangement do outweigh the costs for both the physicians and the hospital ( RQ1). The physicians benefit through actual dollar payout, but also with improved communication and greater input in running the service line. The hospital benefits from reduced cost - or reduced penalties under the ACA - as well as better communication and greater physician involvement in administration of the service line. RQ2: does physician alignment aid in the effective implementation of the ACA directives set for hospitals? The hospital improved in every quality metric under the co-management company. A paired sample difference of means t-test showed a statistically significant improvement in five of the six quality metrics in the study. Originality/value Previous research indicates the potential effectiveness of

  4. Participative management and shared leadership: implementing a model.

    Science.gov (United States)

    Noonan, D

    1995-01-01

    The author identifies the development, implementation and outcomes of a task subgroup model of management that provides a mechanism for shared leadership, planning, decision making, implementation and evaluation by staff, patients and families on a program level. The conceptual model and its operationalization are outlined within the context of the rehabilitation program at the Providence Centre in Scarborough, Ontario.

  5. Tank waste remediation system privatization infrastructure program configuration management implementation plan

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program's products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control

  6. Explaining implementation behaviour of the National Incident Management System (NIMS).

    Science.gov (United States)

    Jensen, Jessica; Youngs, George

    2015-04-01

    This paper explains the perceived implementation behaviour of counties in the United States with respect to the National Incident Management System (NIMS). The system represents a massive and historic policy mandate designed to restructure, standardise and thereby unify the efforts of a wide variety of emergency management entities. Specifically, this study examined variables identified in the NIMS and policy literature that might influence the behavioural intentions and actual behaviour of counties. It found that three key factors limit or promote how counties intend to implement NIMS and how they actually implement the system: policy characteristics related to NIMS, implementer views and a measure of local capacity. One additional variable-inter-organisational characteristics-was found to influence only actual behaviour. This study's findings suggest that the purpose underlying NIMS may not be fulfilled and confirm what disaster research has long suggested: the potential for standardisation in emergency management is limited. © 2015 The Author(s). Disasters © Overseas Development Institute, 2015.

  7. 36 CFR 1220.32 - What records management principles must agencies implement?

    Science.gov (United States)

    2010-07-01

    ... Responsibilities § 1220.32 What records management principles must agencies implement? Agencies must create and... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL...

  8. Liquid effluent Sampling and Analysis Plan (SAP) implementation summary report

    International Nuclear Information System (INIS)

    Lueck, K.J.

    1995-01-01

    This report summarizes liquid effluent analytical data collected during the Sampling and Analysis Plan (SAP) Implementation Program, evaluates whether or not the sampling performed meets the requirements of the individual SAPs, compares the results to the WAC 173-200 Ground Water Quality Standards. Presented in the report are results from liquid effluent samples collected (1992-1994) from 18 of the 22 streams identified in the Consent Order (No. DE 91NM-177) requiring SAPs

  9. Surveillance Monitoring Management for General Care Units: Strategy, Design, and Implementation.

    Science.gov (United States)

    McGrath, Susan P; Taenzer, Andreas H; Karon, Nancy; Blike, George

    2016-07-01

    The growing number of monitoring devices, combined with suboptimal patient monitoring and alarm management strategies, has increased "alarm fatigue," which have led to serious consequences. Most reported alarm man- agement approaches have focused on the critical care setting. Since 2007 Dartmouth-Hitchcock (Lebanon, New Hamp- shire) has developed a generalizable and effective design, implementation, and performance evaluation approach to alarm systems for continuous monitoring in general care settings (that is, patient surveillance monitoring). In late 2007, a patient surveillance monitoring system was piloted on the basis of a structured design and implementation approach in a 36-bed orthopedics unit. Beginning in early 2009, it was expanded to cover more than 200 inpatient beds in all medicine and surgical units, except for psychiatry and labor and delivery. Improvements in clinical outcomes (reduction of unplanned transfers by 50% and reduction of rescue events by more than 60% in 2008) and approximately two alarms per patient per 12-hour nursing shift in the original pilot unit have been sustained across most D-H general care units in spite of increasing patient acuity and unit occupancy. Sample analysis of pager notifications indicates that more than 85% of all alarm conditions are resolved within 30 seconds and that more than 99% are resolved before escalation is triggered. The D-H surveillance monitoring system employs several important, generalizable features to manage alarms in a general care setting: alarm delays, static thresholds set appropriately for the prevalence of events in this setting, directed alarm annunciation, and policy-driven customization of thresholds to allow clinicians to respond to needs of individual patients. The systematic approach to design, implementation, and performance management has been key to the success of the system.

  10. Implementation of a Quality Management System in regulatory inspection activities

    International Nuclear Information System (INIS)

    Pires do Rio, Monica; Ferreira, Paulo Roberto; Cunha, Paulo G. da; Acar, Maria Elizabeth

    2005-01-01

    The Institute for Radioprotection and Dosimetry - IRD -, of the Brazilian National Nuclear Energy Commission, CNEN, started in 2001, the implementation of a quality management system (SGQ), in the inspection, testing and calibration activities. The SGQ was an institutional guideline and is inserted in a larger system of management of the IRD started in 1999, with the adoption of the National Quality Award criteria - PNQ, within the Project for Excellence in Technological Research of Associacao Brasileira das Instituicoes de Pesquisas Tecnologicas - ABIPTI (Brazilian Association of Technological Research institutions). The proposed quality management system and adopted at the IRD was developed and implemented in accordance with the requirements of NBR ISO/IEC 17025 - General requirements for the competence of testing and calibration laboratories, and ISO/IEC 17020 - General criteria for operation of various types of bodies performing inspections. For regulatory inspection activities, the quality system was implemented on three program inspection services of radiological protection led, respectively, by clinics and hospitals that operate radiotherapy services; industries that use nuclear gauges in their control or productive processes and power reactor operators (CNAAA) - just the environmental part. It was formed a pioneering team of inspectors for standardizing the processes, procedures and starting the implementation of the system in the areas. This work describes the implementation process steps, including difficulties, learning and advantages of the adoption of a quality management system in inspection activities

  11. Implementation of dextrose gel in the management of neonatal hypoglycaemia.

    Science.gov (United States)

    Ter, Marene; Halibullah, Ikhwan; Leung, Laura; Jacobs, Susan

    2017-04-01

    The aim of this study was to evaluate dextrose gel in the management of neonatal hypoglycaemia in the postnatal wards at an Australian tertiary level perinatal centre. An audit was performed before and after implementation of dextrose gel. Pre-implementation, neonatal hypoglycaemia was managed with feed supplementation alone, and dextrose gel was used in addition to feed supplementation in the post-implementation phase. Outcomes included admission to neonatal intensive care unit (NICU) for management of hypoglycaemia, proportion of neonates who achieved normoglycaemia (defined as blood glucose ≥2.6 mmol/L, with no clinical signs after one or two treatment attempts) and proportion of neonates with hypoglycaemia recurrence after normoglycaemia and one or two treatment attempts. NICU admission for treatment of hypoglycaemia reduced significantly post-implementation of dextrose gel (29/100 (29%) vs. 14/100 (14%), P = 0.01). No significant difference was seen in the proportion of neonates achieving normoglycaemia (71/100 (71%) vs. 75/100 (75%), P = 0.52), but hypoglycaemia recurrence was higher in the post-implementation group (22/71 (31%) vs. 37/75 (49%), P = 0.02). Dextrose gel is effective in the management of neonatal hypoglycaemia in the postnatal ward setting, reducing admission to NICU and mother-infant separation. © 2016 Paediatrics and Child Health Division (The Royal Australasian College of Physicians).

  12. On the effectiveness in implementing a waste-management-plan method in construction

    International Nuclear Information System (INIS)

    Tam, Vivian W.Y.

    2008-01-01

    The increasing awareness of waste management concerns from construction and demolition waste has led to the development of waste management as an important function of construction project management. The Hong Kong government started employing the implementation of a waste-management-plan (WMP) method for all construction projects in 2003. During the trial period, the government received different version of feedback from the industry. It also came out that detailed descriptions of waste management procedures in the WMP method largely affect the productivity of companies. This paper investigates the effectiveness of the existing implementation of the WMP method in the Hong Kong construction industry. A questionnaire survey and structured interviews were conducted. The result showed that 'Propose methods for on-site reuse of materials' and 'Propose methods for reducing waste' are the main benefits gained from the implementation of the WMP method. However, 'Low financial incentive' and 'Increase in overhead cost' are considered as the major difficulties in the implementation. From that, 'Use of prefabricated building components' is considered as the major effective measure to encourage the implementation of the WMP method

  13. Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, Implementation Strategy for a Distribution Management System

    Energy Technology Data Exchange (ETDEWEB)

    Singh, Ravindra [Argonne National Lab. (ANL), Argonne, IL (United States); Reilly, James T. [Reilly Associates, Pittston, PA (United States); Wang, Jianhui [Argonne National Lab. (ANL), Argonne, IL (United States)

    2017-03-01

    Electric distribution utilities encounter many challenges to successful deployment of Distribution Management Systems (DMSs). The key challenges are documented in this report, along with suggestions for overcoming them. This report offers a recommended list of activities for implementing a DMS. It takes a strategic approach to implementing DMS from a project management perspective. The project management strategy covers DMS planning, procurement, design, building, testing, Installation, commissioning, and system integration issues and solutions. It identifies the risks that are associated with implementation and suggests strategies for utilities to use to mitigate them or avoid them altogether. Attention is given to common barriers to successful DMS implementation. This report begins with an overview of the implementation strategy for a DMS and proceeds to put forward a basic approach for procuring hardware and software for a DMS; designing the interfaces with external corporate computing systems such as EMS, GIS, OMS, and AMI; and implementing a complete solution.

  14. Managerial attitude to the implementation of quality management systems in Lithuanian support treatment and nursing hospitals

    Directory of Open Access Journals (Sweden)

    Lydeka Zigmas

    2006-09-01

    Full Text Available Abstract Background The regulations of the Quality Management System (QMS implementation in health care organizations were approved by the Lithuanian Ministry of Health in 1998. Following the above regulations, general managers of health care organizations had to initiate the QMS implementation in hospitals. As no research on the QMS implementation has been carried out in Lithuanian support treatment and nursing hospitals since, the objective of this study is to assess its current stage from a managerial perspective. Methods A questionnaire survey of general managers of Lithuanian support treatment and nursing hospitals was carried out in the period of January through March 2005. Majority of the items included in the questionnaire were measured on a seven-point Likert scale. During the survey, a total of 72 questionnaires was distributed, out of which 58 filled-in ones were returned (response rate 80.6 per cent; standard sampling error 0.029 at 95 per cent level of confidence. Results Quality Management Systems were found operating in 39.7 per cent of support treatment and nursing hospitals and currently under implementation in 46.6 per cent of hospitals (13.7% still do not have it. The mean of the respondents' perceived QMS significance is 5.8 (on a seven-point scale. The most critical issues related to the QMS implementation include procedure development (5.5, lack of financial resources (5.4 and information (5.1, and development of work guidelines (4.6, while improved responsibility and power sharing (5.2, better service quality (5.1 and higher patient satisfaction (5.1 were perceived by the respondents as the key QMS benefits. The level of satisfaction with the QMS among the management of the surveyed hospitals is mediocre (3.6. However it was found to be higher among respondents who were more competent in quality management, were familiar with ISO 9000 standards, and had higher numbers of employees trained in quality management. Conclusion

  15. NPP Krsko Severe Accident Management Guidelines Implementation

    International Nuclear Information System (INIS)

    Basic, I.; Krajnc, B.; Bilic-Zabric, T.; Spiler, J.

    2002-01-01

    Severe Accident Management is a framework to identify and implement the Emergency Response Capabilities that can be used to prevent or mitigate severe accidents and their consequences. The USA NRC has indicated that the development of a licensee plant specific accident management program will be required in order to close out the severe accident regulatory issue (Ref. SECY-88-147). Generic Letter 88-20 ties the Accident management Program to IPE for each plant. The SECY-89-012 defines those actions taken during the course of an accident by the plant operating and technical staff to: 1) prevent core damage, 2) terminate the progress of core damage if it begins and retain the core within the reactor vessel, 3) maintain containment integrity as long as possible, and 4) minimize offsite releases. The subject of this paper is to document the severe accident management activities, which resulted in a plant specific Severe Accident Management Guidelines implementation. They have been developed based on the Krsko IPE (Individual Plant Examination) insights, Generic WOG SAMGs (Westinghouse Owners Group Severe Accident Management Guidances) and plant specific documents developed within this effort. Among the required plant specific actions the following are the most important ones: Identification and documentation of those Krsko plant specific severe accident management features (which also resulted from the IPE investigations). The development of the Krsko plant specific background documents (Severe Accident Plant Specific Strategies and SAMG Setpoint Calculation). Also, paper discusses effort done in the areas of NPP Krsko SAMG review (internal and external ), validation on Krsko Full Scope Simulator (Severe Accident sequences are simulated by MAAP4 in real time) and world 1st IAEA Review of Accident Management Programmes (RAMP). (author)

  16. Assessing the impact of continuous quality improvement/total quality management: concept versus implementation.

    Science.gov (United States)

    Shortell, S M; O'Brien, J L; Carman, J M; Foster, R W; Hughes, E F; Boerstler, H; O'Connor, E J

    1995-01-01

    OBJECTIVE: This study examines the relationships among organizational culture, quality improvement processes and selected outcomes for a sample of up to 61 U. S. hospitals. DATA SOURCES AND STUDY SETTING: Primary data were collected from 61 U. S. hospitals (located primarily in the midwest and the west) on measures related to continuous quality improvement/total quality management (CQI/TQM), organizational culture, implementation approaches, and degree of quality improvement implementation based on the Baldrige Award criteria. These data were combined with independently collected data on perceived impact and objective measures of clinical efficiency (i.e., charges and length of stay) for six clinical conditions. STUDY DESIGN: The study involved cross-sectional examination of the named relationships. DATA COLLECTION/EXTRACTION METHODS: Reliable and valid scales for the organizational culture and quality improvement implementation measures were developed based on responses from over 7,000 individuals across the 61 hospitals with an overall completion rate of 72 percent. Independent data on perceived impact were collected from a national survey and independent data on clinical efficiency from a companion study of managed care. PRINCIPAL FINDINGS: A participative, flexible, risk-taking organizational culture was significantly related to quality improvement implementation. Quality improvement implementation, in turn, was positively associated with greater perceived patient outcomes and human resource development. Larger-size hospitals experienced lower clinical efficiency with regard to higher charges and higher length of stay, due in part to having more bureaucratic and hierarchical cultures that serve as a barrier to quality improvement implementation. CONCLUSIONS: What really matters is whether or not a hospital has a culture that supports quality improvement work and an approach that encourages flexible implementation. Larger-size hospitals face more difficult

  17. Implementation of Hepatitis Information Management System in Iran.

    Science.gov (United States)

    Reza, Safdari; Jebraeil, Farzi; Akbar, Nasiri Ali; Marjan, Ghazisaeedi; Reza, Taghavi Mohammad; Mehdi, Afshari; Mahlagha, Sargolzaee; Farhad, Taji

    2015-11-17

    Nowadays, hepatitis is of the most important health priorities around the world, where information plays a very significant role in specialized diseases prevention planning, and policy- and decision-making processes. Thus, this study addressed challenges of hepatitis information management and investigated the outcomes of establishing a hepatitis information management system to overcome such challenges. To this end, this research intended to study the implementation of an Electronic hepatitis information management system. This is an applied-developmental study with following specifications and procedures: preparation of study proposal and design, justification of the design's stakeholders, approval of the design by the Postgraduate Education Council of Faculty, determination of pilot hepatitis control center, software development, deciding on control, prevention, and treatment centers, and finally development of a network-based system for collecting and managing hepatitis information. Results indicated that the inconsistency and lack of integrity of data, as well as the lack of communication between related units prevented timely information register of viral hepatic patients and services that are provided to them. This inhibited the possibility of considering a follow-up process. However, the implementation of this system and involvement of relevant units greatly solved these problems. Results show that the implementation of an electronic system for the management of hepatitis control, prevention, and treatment is a regional and national requirement; since, this system with its empowered infrastructure is capable in providing desired services to all laboratories, counseling and health centers, specialized clinics, and physicians connected to the hepatitis network. This enables them to follow up and monitor patients' conditions. That mentioned system paves the way for the analysis of gathered information, managers' and specialists' access in different regions to

  18. The INEL approach: Environmental Restoration Program management and implementation methodology

    International Nuclear Information System (INIS)

    1996-01-01

    The overall objectives of the INEL Environmental Restoration (ER) Program management approach are to facilitate meeting mission needs through the successful implementation of a sound, and effective project management philosophy. This paper outlines the steps taken to develop the ER program, and explains further the implementing tools and processes used to achieve what can be viewed as fundamental to a successful program. The various examples provided will demonstrate how the strategies for implementing these operating philosophies are actually present and at work throughout the program, in spite of budget drills and organizational changes within DOE and the implementing contractor. A few of the challenges and successes of the INEL Environmental Restoration Program have included: a) completion of all enforceable milestones to date, b) acceleration of enforceable milestones, c) managing funds to reduce uncosted obligations at year end by utilizing greater than 99% of FY-95 budget, d) an exemplary safety record, e) developing a strategy for partial Delisting of the INEL by the year 2000, f) actively dealing with Natural Resource Damages Assessment issues, g) the achievement of significant project cost reductions, h) and implementation of a partnering charter and application of front end quality principles

  19. Strategies in disability management. Corporate disability management programs implemented at the work site.

    Science.gov (United States)

    Kalina, C M

    1999-10-30

    Managers are challenged to demonstrate all programs as economically essential to the business, generating an appreciable return on investment. Further challenge exists to blend and integrate clinical and business objectives in program development. Disability management programs must be viewed as economically essential to the financial success of the business to assure management support for clinical interventions and return-to-work strategies essential for a successful program. This paper discusses a disability management program integrating clinical and business goals and objectives in return-to-work strategies to effect positive clinical, social-cultural, and business results. Clinical, educational, social, and economic challenges in the development, implementation, and continued management of a disability program at a large corporation with multiple global work sites are defined. Continued discussion addresses the effective clinical interventions and educational strategies utilized successfully within the workplace environment in response to each defined challenge. A multiple disciplinary team approach, clinical and business outcome measures, and quality assurance indicators are discussed as major program components. This article discusses a successful program approach focusing on business process and methodology. These parameters are used to link resources to strategy, developing a product for implementing and managing a program demonstrating economic value added through effective clinical medical case management.

  20. Practical Implementation of Sustainable Urban Management Tools

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Jensen, Jesper Ole; Hoffmann, Birgitte

    2006-01-01

    The paper discusses how to promote the use of decision support tools for urban sustainable development. The interest in decision support tools based on indicators is increasing among practitioners and researchers. The research has so far focused on indicator types and systems of indicators...... and goals for urban sustainability whereas less focus has been on the context of implementation and even less on what we can learn from practical experiences about the usefulness of urban sustainable indicator tools. This paper explores the practical implementation of urban sustainable management tools....... It is generally agreed that in order to make indicators and other sustainability management tools work it is necessary that they are integrated in the relevant urban organisational levels, in a way that creates commitment to the subsequent goals. This includes involvement of organisations, individuals and other...

  1. Dryden Flight Research Center Critical Chain Project Management Implementation

    Science.gov (United States)

    Hines, Dennis O.

    2012-01-01

    In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

  2. Implementing Environmental Management Accounting: Status and Challenges

    DEFF Research Database (Denmark)

    Cost Accounting - and its Interaction with Eco-Efficiency Performance Measurement and Indicators; Stefan Schaltegger and Marcus Wagner. 4. Environmental Accounting Dimensions: Pros and Cons of Trajectory Convergence and Increased Efficiency; Pontus Cerin and Staffan Laestadius. 5. Process and Content......Table of contents Preface. 1. Environmental Management Accounting: Innovation or Managerial Fad?; Pall Rikhardsson, Martin Bennett, Jan Jaap Bouma and Stefan Schaltegger. Section 1 Progress. 2. Challenges for Environmental Management Accounting; Roger L. Burritt 3. Current Trends in Environmental......: Visualizing the Policy Challenges of Environmental Management Accounting; Dick Osborn. Section 2 Exploring EMA implementation issues. 6. Environmental Performance and the Quality of Corporate Environmental Reports: The Role of Environmental Management Accounting; Marcus Wagner. 7. Environmental Risk...

  3. DOE methods for evaluating environmental and waste management samples

    International Nuclear Information System (INIS)

    Goheen, S.C.; McCulloch, M.; Thomas, B.L.; Riley, R.G.; Sklarew, D.S.; Mong, G.M.; Fadeff, S.K.

    1993-03-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) provides applicable methods in use by. the US Department of Energy (DOE) laboratories for sampling and analyzing constituents of waste and environmental samples. The development of DOE Methods is supported by the Laboratory Management Division (LMD) of the DOE. This document contains chapters and methods that are proposed for use in evaluating components of DOE environmental and waste management samples. DOE Methods is a resource intended to support sampling and analytical activities that will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the US Environmental Protection Agency (EPA), or others

  4. DOE methods for evaluating environmental and waste management samples.

    Energy Technology Data Exchange (ETDEWEB)

    Goheen, S C; McCulloch, M; Thomas, B L; Riley, R G; Sklarew, D S; Mong, G M; Fadeff, S K [eds.; Pacific Northwest Lab., Richland, WA (United States)

    1994-04-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) provides applicable methods in use by. the US Department of Energy (DOE) laboratories for sampling and analyzing constituents of waste and environmental samples. The development of DOE Methods is supported by the Laboratory Management Division (LMD) of the DOE. This document contains chapters and methods that are proposed for use in evaluating components of DOE environmental and waste management samples. DOE Methods is a resource intended to support sampling and analytical activities that will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the US Environmental Protection Agency (EPA), or others.

  5. IMPLEMENTASI SISTEM MANAJEMEN MUTU PELAYANAN KEPERAWATAN MELALUI KEPEMIMPINAN MUTU KEPALA RUANGAN (Implementation of Quality Management System of Nursing Care Through Quality Leadership of Head Nurse

    Directory of Open Access Journals (Sweden)

    aziz alimul hidayat

    2016-04-01

    Full Text Available Introduction: The quality management system is an order that ensures the achievement of goals and quality objectives which are planned in nursing care. One of the factors that may affect the implementation of quality management systems in the inpatient units is the quality leadership of head nurse. This study aims to determine the effect of the quality leadership of the head nurse to the implementation of quality management systems of nursing cares in hospital. Methods: The research method uses analytical research with cross-sectional approach. The sample of this study consists of eight wards; They are Multazam pavillion, Arofah, Sakinah, Shofa Marwah, Annisa, Mina, Ismail, and ICU which meet with the inclusion and exclusion criteria. The data was taken by using simple random sampling. The data collection by using questionnaires, interviews and observation. Data analysis used a simple statistical linear regression tests with a significance the value of α ≤ 0.05. Results: The results showed that the quality of leadership of the head of wards is mostly good (50% and the implementation of quality management system of nursing care is mostly good (62.5%. Results of analysis of the simple linear regression test on the influence of leadership quality of the head nurse through the implementation of the quality management system of inpatient units (ρ = 0.024. Conclusion: The results of this study expect the nurses to increase the commitment and responsibility in implementing the quality management system of nursing cares in the inpatient units so as to achieve the excellent quality of nursing cares and can boost confidence, satisfaction of patients, families, and communities on nursing care. Keywords: Quality Leadership, Quality Management System Implementation

  6. Implementation of a Project Management Office (PMO)--experiences from year 1.

    Science.gov (United States)

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  7. Strengthening Performance Management System Implementation in South African Municipalities

    Directory of Open Access Journals (Sweden)

    Malefetsane Mofolo

    2012-06-01

    Full Text Available Adoption of a performance management system in municipalities presented a serious challenge for its implementation. This scenario is implicitly manifesting itself in the reports of the Auditor-General on the financial statements and performance of municipalities, as well as in the state of local government in South Africa overview report (2009. These reports called for the conceptualisation of a model that to strengthen the implementation in municipalities of a performance management system that is efficient and effective. And most importantly, this model could be beneficial for growth, development and effective service delivery.

  8. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  9. Implementation of the Air Program Information Management System (APIMS) Inspection Module

    Science.gov (United States)

    2009-05-01

    7 5 T H A I R B A S E W I N G Implementation of the Air Program Information Management System (APIMS) Inspection Module 2009 Environment...Implementation of the Air Program Information Management System (APIMS) Inspection Module 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER

  10. Implementation Of Management Strategic To Team Learning Cohesion In Study Program Of Nursing

    Directory of Open Access Journals (Sweden)

    Dr. Susila Sumartiningsih

    2015-06-01

    Full Text Available ABSTRACT The purpose of this research is to analyze the empiric of management strategic Driving Factor DF and Pull Factor PF to team learning cohesion among nursing program in Banten Provinsion. The study was designed in the quantitative descriptive correlational study and the method was a cross sectional. The total sampling n192 were manager n3 lecturers n45 and students n144 at nursing program study among Banten provice in Indonesia. The data were analyzed by using the Chi-Square.Theresults were showngood category 83.33 in DF and PF of Management Stratgict Implementataion and high category 59.72 in Team Learning Cohesion. There was not a statistically significant relationship p 0.543 p amp8805 0.05 between the DF and PF of team learning cohesion in implementation of Management Stratgic. In view of this it can be concluded that the nursing lecturer should be able to be a good motivator in order to encourage the student academic achievement.

  11. PERFORMANCE ACHIEVEMENT OF TOURISM ENTERPRISE BY IMPLEMENTING MANAGEMENT STRATEGIES

    Directory of Open Access Journals (Sweden)

    Nicolae PLATON

    2017-04-01

    Full Text Available For managerial practice it is important to know the methodology of developing a tourism business strategy, more than the theoretical concepts related to this field. The enterprise strategy is an important lever to boost and support the change of emphasis of the creative side of the organization's management. Based on these prerequisites, the author makes an overview of the need to adopt a management strategy within the enterprise, describes the defining features of the strategy in the view of some authors, classifies the strategies according to several criteria, proposes a management model specific to the tourism enterprise, carries out the comparative analysis of how to formulate and how to implement the strategy, characterizes the difficulties that arise in the process of strategy implementation.

  12. Developing an active implementation model for a chronic disease management program.

    Science.gov (United States)

    Smidth, Margrethe; Christensen, Morten Bondo; Olesen, Frede; Vedsted, Peter

    2013-04-01

    Introduction and diffusion of new disease management programs in healthcare is usually slow, but active theory-driven implementation seems to outperform other implementation strategies. However, we have only scarce evidence on the feasibility and real effect of such strategies in complex primary care settings where municipalities, general practitioners and hospitals should work together. The Central Denmark Region recently implemented a disease management program for chronic obstructive pulmonary disease (COPD) which presented an opportunity to test an active implementation model against the usual implementation model. The aim of the present paper is to describe the development of an active implementation model using the Medical Research Council's model for complex interventions and the Chronic Care Model. We used the Medical Research Council's five-stage model for developing complex interventions to design an implementation model for a disease management program for COPD. First, literature on implementing change in general practice was scrutinised and empirical knowledge was assessed for suitability. In phase I, the intervention was developed; and in phases II and III, it was tested in a block- and cluster-randomised study. In phase IV, we evaluated the feasibility for others to use our active implementation model. The Chronic Care Model was identified as a model for designing efficient implementation elements. These elements were combined into a multifaceted intervention, and a timeline for the trial in a randomised study was decided upon in accordance with the five stages in the Medical Research Council's model; this was captured in a PaTPlot, which allowed us to focus on the structure and the timing of the intervention. The implementation strategies identified as efficient were use of the Breakthrough Series, academic detailing, provision of patient material and meetings between providers. The active implementation model was tested in a randomised trial

  13. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-01-01

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user's guide to the Data Quality Objective process, and a self-assessment checklist

  14. Integrated System Health Management: Foundational Concepts, Approach, and Implementation.

    Science.gov (United States)

    Figueroa, Fernando; Schmalzel, John; Walker, Mark; Venkatesh, Meera; Kapadia, Ravi; Morris, Jon; Turowski, Mark; Smith, Harvey

    2009-01-01

    Implementation of integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive to an accurate and reliable assessment of its health. We present concepts, procedures, and a specific approach as a foundation for implementing a credible ISHM capability. The capability stresses integration of DIaK from all elements of a system. The intent is also to make possible implementation of on-board ISHM capability, in contrast to a remote capability. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems (rocket engine test facilities). The paper will address the following topics: 1. ISHM Model of a system 2. Detection of anomaly indicators. 3. Determination and confirmation of anomalies. 4. Diagnostic of causes and determination of effects. 5. Consistency checking cycle. 6. Management of health information 7. User Interfaces 8. Example implementation ISHM has been defined from many perspectives. We define it as a capability that might be achieved by various approaches. We describe a specific approach that has been matured throughout many years of development, and pilot implementations. ISHM is a capability that is achieved by integrating data, information, and knowledge (DIaK) that might be distributed throughout the system elements (which inherently implies capability to manage DIaK associated with distributed sub-systems). DIaK must be available to any element of a system at the right time and in accordance with a meaningful context. ISHM Functional Capability Level (FCL) is measured by how well a system performs the following

  15. What would it take? Stakeholders' views and preferences for implementing a health care manager program in community mental health clinics under health care reform.

    Science.gov (United States)

    Cabassa, Leopoldo J; Gomes, Arminda P; Lewis-Fernández, Roberto

    2015-02-01

    Health care manager interventions can improve the physical health of people with serious mental illness (SMI). In this study, we used concepts from the theory of diffusion of innovations, the consolidated framework for implementation research and a taxonomy of implementation strategies to examine stakeholders' recommendations for implementing a health care manager intervention in public mental health clinics serving Hispanics with SMI. A purposive sample of 20 stakeholders was recruited from mental health agencies, primary care clinics, and consumer advocacy organizations. We presented participants a vignette describing a health care manager intervention and used semistructured qualitative interviews to examine their views and recommendations for implementing this program. Interviews were recorded, professionally transcribed, and content analyzed. We found that a blend of implementation strategies that demonstrates local relative advantage, addresses cost concerns, and enhances compatibility to organizations and the client population is critical for moving health care manager interventions into practice. © The Author(s) 2014.

  16. Towards a resilience management framework for complex enterprise systems upgrade implementation

    Science.gov (United States)

    Teoh, Say Yen; Yeoh, William; Zadeh, Hossein Seif

    2017-05-01

    The lack of knowledge of how resilience management supports enterprise system (ES) projects accounts for the failure of firms to leverage their investments in costly ES implementations. Using a structured-pragmatic-situational (SPS) case study research approach, this paper reports on an investigation into the resilience management of a large utility company as it implemented an ES upgrade. Drawing on the literature and on the case study findings, we developed a process-based resilience management framework that involves three strategies (developing situation awareness, demystifying threats, and executing restoration plans) and four organisational capabilities that transform resilience management concepts into practices. We identified the crucial phases of ES upgrade implementation and developed indicators for how different strategies and capabilities of resilience management can assist managers at different stages of an ES upgrade. This research advances the state of existing knowledge by providing specific and verifiable propositions for attaining a state of resilience, the knowledge being grounded in the empirical reality of a case study. Moreover, the framework offers ES practitioners a roadmap to better identify appropriate responses and levels of preparedness.

  17. Implementation of anaphylaxis management guidelines: a register-based study.

    Directory of Open Access Journals (Sweden)

    Linus Grabenhenrich

    Full Text Available BACKGROUND: Anaphylaxis management guidelines recommend the use of intramuscular adrenaline in severe reactions, complemented by antihistamines and corticoids; secondary prevention includes allergen avoidance and provision of self-applicable first aid drugs. Gaps between recommendations and their implementation have been reported, but only in confined settings. Hence, we analysed nation-wide data on the management of anaphylaxis, evaluating the implementation of guidelines. METHODS: Within the anaphylaxis registry, allergy referral centres across Germany, Austria and Switzerland provided data on severe anaphylaxis cases. Based on patient records, details on reaction circumstances, diagnostic workup and treatment were collected via online questionnaire. Report of anaphylaxis through emergency physicians allowed for validation of registry data. RESULTS: 2114 severe anaphylaxis patients from 58 centres were included. 8% received adrenaline intravenously, 4% intramuscularly; 50% antihistamines, and 51% corticoids. Validation data indicated moderate underreporting of first aid drugs in the Registry. 20% received specific instructions at the time of the reaction; 81% were provided with prophylactic first aid drugs at any time. CONCLUSION: There is a distinct discrepancy between current anaphylaxis management guidelines and their implementation. To improve patient care, a revised approach for medical education and training on the management of severe anaphylaxis is warranted.

  18. Health care managers' views on and approaches to implementing models for improving care processes.

    Science.gov (United States)

    Andreasson, Jörgen; Eriksson, Andrea; Dellve, Lotta

    2016-03-01

    To develop a deeper understanding of health-care managers' views on and approaches to the implementation of models for improving care processes. In health care, there are difficulties in implementing models for improving care processes that have been decided on by upper management. Leadership approaches to this implementation can affect the outcome. In-depth interviews with first- and second-line managers in Swedish hospitals were conducted and analysed using grounded theory. 'Coaching for participation' emerged as a central theme for managers in handling top-down initiated process development. The vertical approach in this coaching addresses how managers attempt to sustain unit integrity through adapting and translating orders from top management. The horizontal approach in the coaching refers to managers' strategies for motivating and engaging their employees in implementation work. Implementation models for improving care processes require a coaching leadership built on close manager-employee interaction, mindfulness regarding the pace of change at the unit level, managers with the competence to share responsibility with their teams and engaged employees with the competence to share responsibility for improving the care processes, and organisational structures that support process-oriented work. Implications for nursing management are the importance of giving nurse managers knowledge of change management. © 2015 John Wiley & Sons Ltd.

  19. Are Health Facility Management Committees in Kenya ready to implement financial management tasks: findings from a nationally representative survey.

    Science.gov (United States)

    Waweru, Evelyn; Opwora, Antony; Toda, Mitsuru; Fegan, Greg; Edwards, Tansy; Goodman, Catherine; Molyneux, Sassy

    2013-10-10

    Community participation in peripheral public health facilities has in many countries focused on including community representatives in Health Facility Management Committees (HFMCs). In Kenya, HFMC roles are being expanded with the phased implementation of the Health Sector Services Fund (HSSF). Under HSSF, HFMCs manage facility funds which are dispersed directly from central level into facility bank accounts. We assessed how prepared HFMCs were to undertake this new role in advance of HSSF roll out, and considered the implications for Kenya and other similar settings. Data were collected through a nationally representative sample of 248 public health centres and dispensaries in 24 districts in 2010. Data collection included surveys with in-charges (n = 248), HFMC members (n = 464) and facility users (n = 698), and record reviews. These data were supplemented by semi-structured interviews with district health managers in each district. Some findings supported preparedness of HFMCs to take on their new roles. Most facilities had bank accounts and HFMCs which met regularly. HFMC members and in-charges generally reported positive relationships, and HFMC members expressed high levels of motivation and job satisfaction. Challenges included users' low awareness of HFMCs, lack of training and clarity in roles among HFMCs, and some indications of strained relations with in-charges. Such challenges are likely to be common to many similar settings, and are therefore important considerations for any health facility based initiatives involving HFMCs. Most HFMCs have the basic requirements to operate. However to manage their own budgets effectively and meet their allocated roles in HSSF implementation, greater emphasis is needed on financial management training, targeted supportive supervision, and greater community awareness and participation. Once new budget management roles are fully established, qualitative and quantitative research on how HFMCs are adapting to

  20. Implementing new product development: A study of personal characteristics among managers

    DEFF Research Database (Denmark)

    Jespersen, Kristina Risom; Bysted, Rune

    2016-01-01

    Strategy implementation is an important aspect of innovation, as only 30% of planned strategies are matched by realised innovation outcomes. The present study investigates this in a setting of strategic implementation of New Product Development (NPD). In the implementation process, the managers...... strategic intentions create information overload in the NPD process, which decreases the new product novelty. In contrast, realisation of defensive strategic intentions makes experienced NPD managers focus on known NPD competences, thereby decreasing the new product novelty of NPD efforts. The study...

  1. The Control of the Implementation and Management of European Funds

    Directory of Open Access Journals (Sweden)

    Vasile Burja

    2018-03-01

    Full Text Available Effective implementation and management of European funds is of major importance for the new members of the European Union. Controlling these funds aims to increase the performance of their use. European regulations require Member States to take appropriate measures to properly maintain and operate their management and control systems so that they can offer the necessary assurances regarding the correct use of the allocated funds. This article highlights the importance of control exercised within institutions that implement and manage European funds. There have been many irregularities in the implementation of projects funded by European funds. In order to determine the most frequent types of irregularities, a questionnaire was applied to the experts responsible for controlling European funds in intermediary bodies. In this article we will present the results obtained after the centralization of expert responses and the importance of control in the prevention of irregularities and fraud.

  2. Sample Identification at Scale - Implementing IGSN in a Research Agency

    Science.gov (United States)

    Klump, J. F.; Golodoniuc, P.; Wyborn, L. A.; Devaraju, A.; Fraser, R.

    2015-12-01

    Earth sciences are largely observational and rely on natural samples, types of which vary significantly between science disciplines. Sharing and referencing of samples in scientific literature and across the Web requires the use of globally unique identifiers essential for disambiguation. This practice is very common in other fields, e.g. ISBN in publishing, doi in scientific literature, etc. In Earth sciences however, this is still often done in an ad-hoc manner without the use of unique identifiers. The International Geo Sample Number (IGSN) system provides a persistent, globally unique label for identifying environmental samples. As an IGSN allocating agency, CSIRO implements the IGSN registration service at the organisational scale with contributions from multiple research groups. Capricorn Distal Footprints project is one of the first pioneers and early adopters of the technology in Australia. For this project, IGSN provides a mechanism for identification of new and legacy samples, as well as derived sub-samples. It will ensure transparency and reproducibility in various geochemical sampling campaigns that will involve a diversity of sampling methods. Hence, diverse geochemical and isotopic results can be linked back to the parent sample, particularly where multiple children of that sample have also been analysed. The IGSN integration for this project is still in early stages and requires further consultations on the governance mechanisms that we need to put in place to allow efficient collaboration within CSIRO and collaborating partners on the project including naming conventions, service interfaces, etc. In this work, we present the results of the initial implementation of IGSN in the context of the Capricorn Distal Footprints project. This study has so far demonstrated the effectiveness of the proposed approach, while maintaining the flexibility to adapt to various media types, which is critical in the context of a multi-disciplinary project.

  3. IMPLEMENTATION OF INTEGRAL SYSTEM OF QUALITY MANAGEMENT IN TOURISM

    Directory of Open Access Journals (Sweden)

    Vidoje Vujic

    2007-12-01

    Full Text Available Theory and practice have corroborated the need and usefulness of an integral approach to quality management in tourist destinations, since the destination and its touristic offer define a number of disparate participants and interested parties. An integral system of quality management is one of the models of touristic management that with the implementation of contemporary principles strives to achieve business excellence and competitory advantage. The paper determines and projects the need and importance of implementing an integral system and accordingly seeks to form a model for its development. By studying the oneness of the whole we have established the dependence and firm connections between particular norms and elements, and by analyzing them in this paper we describe the structure and associated characteristics of the whole.

  4. Effect of care management program structure on implementation: a normalization process theory analysis.

    Science.gov (United States)

    Holtrop, Jodi Summers; Potworowski, Georges; Fitzpatrick, Laurie; Kowalk, Amy; Green, Lee A

    2016-08-15

    Care management in primary care can be effective in helping patients with chronic disease improve their health status, however, primary care practices are often challenged with implementation. Further, there are different ways to structure care management that may make implementation more or less successful. Normalization process theory (NPT) provides a means of understanding how a new complex intervention can become routine (normalized) in practice. In this study, we used NPT to understand how care management structure affected how well care management became routine in practice. Data collection involved semi-structured interviews and observations conducted at 25 practices in five physician organizations in Michigan, USA. Practices were selected to reflect variation in physician organizations, type of care management program, and degree of normalization. Data were transcribed, qualitatively coded and analyzed, initially using an editing approach and then a template approach with NPT as a guiding framework. Seventy interviews and 25 observations were completed. Two key structures for care management organization emerged: practice-based care management where the care managers were embedded in the practice as part of the practice team; and centralized care management where the care managers worked independently of the practice work flow and was located outside the practice. There were differences in normalization of care management across practices. Practice-based care management was generally better normalized as compared to centralized care management. Differences in normalization were well explained by the NPT, and in particular the collective action construct. When care managers had multiple and flexible opportunities for communication (interactional workability), had the requisite knowledge, skills, and personal characteristics (skill set workability), and the organizational support and resources (contextual integration), a trusting professional relationship

  5. The development and implementation of a waste management strategy

    International Nuclear Information System (INIS)

    Fairhall, G.A.; Vickery, P.; Edmiston, L.

    1999-01-01

    Over the past forty years BNFL has operated 4 nuclear sites in the UK. Commercial operations on these sites span the full nuclear fuel cycle from enrichment, fuel fabrication, electricity generation, reprocessing, waste management, and decommissioning. Through the recent merger with Magnox Electric BNFL has acquired a further 8 Magnox reactor sites in the UK. Prior to 1980 BNFL adopted a policy of storing wastes generated by its activities in an unconditioned state in purpose built stores. This paper shows how BNFL's waste management strategy has developed to ensure how volume reduction technologies have been implemented for low level waste. Whilst immobilisation technologies have been implemented for high and intermediate level wastes. The paper describes how continual review of the strategy ensures waste management processes are continually monitored against progress and optimised to ensure all waste arisings are conditioned for final disposal. Finally the paper will show how the strategy can be used to develop waste management plans for customer sites. (author)

  6. Understanding middle managers' influence in implementing patient safety culture.

    Science.gov (United States)

    Gutberg, Jennifer; Berta, Whitney

    2017-08-22

    The past fifteen years have been marked by large-scale change efforts undertaken by healthcare organizations to improve patient safety and patient-centered care. Despite substantial investment of effort and resources, many of these large-scale or "radical change" initiatives, like those in other industries, have enjoyed limited success - with practice and behavioural changes neither fully adopted nor ultimately sustained - which has in large part been ascribed to inadequate implementation efforts. Culture change to "patient safety culture" (PSC) is among these radical change initiatives, where results to date have been mixed at best. This paper responds to calls for research that focus on explicating factors that affect efforts to implement radical change in healthcare contexts, and focuses on PSC as the radical change implementation. Specifically, this paper offers a novel conceptual model based on Organizational Learning Theory to explain the ability of middle managers in healthcare organizations to influence patient safety culture change. We propose that middle managers can capitalize on their unique position between upper and lower levels in the organization and engage in 'ambidextrous' learning that is critical to implementing and sustaining radical change. This organizational learning perspective offers an innovative way of framing the mid-level managers' role, through both explorative and exploitative activities, which further considers the necessary organizational context in which they operate.

  7. AASHTO transportation asset management guide : a focus on implementation executive summary.

    Science.gov (United States)

    2013-06-01

    This AASHTO Transportation Asset Management Executive Summary serves as a companion to the AASHTO Transportation : Asset Management GuideA Focus on Implementation, which takes as a starting point the Transportation : Asset Management Guide publish...

  8. Site-specific waste management instruction for the field sampling organization

    International Nuclear Information System (INIS)

    Bryant, D.L.

    1997-01-01

    The Site-Specific Waste Management Instruction (SSWMI) provides guidance for the management of waste generated from field-sampling activities performed by the Environment Restoration Contractor (ERC) Sampling Organization that are not managed as part of a project SSWMI. Generally, the waste is unused preserved groundwater trip blanks, used and expired calibration solutions, and other similar waste that cannot be returned to an ERC project for disposal. The specific waste streams addressed by this SSWMI are identified in Section 2.0. This SSWMI was prepared in accordance with BHI-EE-02, Environmental Requirements. Waste generated from field sample collection activities should be returned to the project and managed in accordance with the applicable project-specific SSWMI whenever possible. However, returning all field sample collection and associated waste to a project for disposal may not always be practical or cost effective. Therefore, the ERC field sampling organization must manage and arrange to dispose of the waste using the (Bechtel Hanford, Inc. [BHI]) Field Support Waste Management (FSWM) services. This SSWMI addresses those waste streams that are the responsibility of the field sampling organization to manage and make arrangements for disposal

  9. ERP project implementation and risk management of nuclear power enterprise

    International Nuclear Information System (INIS)

    Wang Fei

    2008-01-01

    According to the characteristic and development trend of nuclear power enterprise informatization, combined with the general ERP implementation experience, the method is proposed to ensure the successful implementation and risk management of ERP project in nuclear power enterprise. (authors)

  10. Team management as a condition for the implementation of competency management training of future specialists

    OpenAIRE

    Драч, Ірина Іванівна

    2015-01-01

    The article described the specific features that define the independent status of the competence-based management training of future specialists in the management of educational activities. The use of principles of team in the implementation of a new management paradigm is justified. The advantages of using a matrix organizational structure are characterized

  11. Pharmacist-led admission medication reconciliation before and after the implementation of an electronic medication management system.

    Science.gov (United States)

    Sardaneh, Arwa A; Burke, Rosemary; Ritchie, Angus; McLachlan, Andrew J; Lehnbom, Elin C

    2017-05-01

    To investigate the impact of the introduction of an electronic medication management system on the proportion of patients with a recorded medication reconciliation on admission, the time from admission to when medication reconciliation was performed, and the characteristics of patients receiving this intervention pre-and post-implementation. An electronic medication management system was implemented in an Australian hospital from May to July 2015. A retrospective observational study was conducted in three wards across two phases; pre- (August 2014) and post- (August 2015) implementation. The study sample included every second patient admitted to these wards. A total of 370 patients were included, 179 pre- and 191 post-implementation. The proportion of recorded admission medication reconciliation significantly increased post-implementation in all study wards; coronary care unit (40 vs 68%, p=0.004), gastroenterology ward (39 vs 59%, p=0.015), and the neurology ward (19 vs 45%, p=0.002). The proportion of patients with recorded medication reconciliation within 24h of weekday admissions, or 48-72h of weekend admissions, increased from 47% pre- to 84% post-implementation. Admission medication reconciliation was recorded within a median of 1.0day for weekday admissions pre- and post-implementation (IQR 1.1 vs 0.2, respectively), and 3.5days (IQR 2.0) pre-implementation vs 1.5days (IQR 2.0) post-implementation for weekend admissions. Overall, across both phases pre-and post-implementation, admission medication reconciliation was recorded for patients who were significantly older (median 77 and 71 years, p<0.001), had a higher number of preadmission medications (median 6.5 and 5.0 medicines, p=0.001), and had a longer hospital stay (median 6.5 and 5.1days, p=0.003). A significantly higher proportion of patients with recorded medication reconciliation in the pre-implementation phase experienced polypharmacy (61%, p=0.002), hyperpolypharmacy (15%, p=0.001), and used a high

  12. A statistically rigorous sampling design to integrate avian monitoring and management within Bird Conservation Regions.

    Science.gov (United States)

    Pavlacky, David C; Lukacs, Paul M; Blakesley, Jennifer A; Skorkowsky, Robert C; Klute, David S; Hahn, Beth A; Dreitz, Victoria J; George, T Luke; Hanni, David J

    2017-01-01

    Monitoring is an essential component of wildlife management and conservation. However, the usefulness of monitoring data is often undermined by the lack of 1) coordination across organizations and regions, 2) meaningful management and conservation objectives, and 3) rigorous sampling designs. Although many improvements to avian monitoring have been discussed, the recommendations have been slow to emerge in large-scale programs. We introduce the Integrated Monitoring in Bird Conservation Regions (IMBCR) program designed to overcome the above limitations. Our objectives are to outline the development of a statistically defensible sampling design to increase the value of large-scale monitoring data and provide example applications to demonstrate the ability of the design to meet multiple conservation and management objectives. We outline the sampling process for the IMBCR program with a focus on the Badlands and Prairies Bird Conservation Region (BCR 17). We provide two examples for the Brewer's sparrow (Spizella breweri) in BCR 17 demonstrating the ability of the design to 1) determine hierarchical population responses to landscape change and 2) estimate hierarchical habitat relationships to predict the response of the Brewer's sparrow to conservation efforts at multiple spatial scales. The collaboration across organizations and regions provided economy of scale by leveraging a common data platform over large spatial scales to promote the efficient use of monitoring resources. We designed the IMBCR program to address the information needs and core conservation and management objectives of the participating partner organizations. Although it has been argued that probabilistic sampling designs are not practical for large-scale monitoring, the IMBCR program provides a precedent for implementing a statistically defensible sampling design from local to bioregional scales. We demonstrate that integrating conservation and management objectives with rigorous statistical

  13. A statistically rigorous sampling design to integrate avian monitoring and management within Bird Conservation Regions.

    Directory of Open Access Journals (Sweden)

    David C Pavlacky

    Full Text Available Monitoring is an essential component of wildlife management and conservation. However, the usefulness of monitoring data is often undermined by the lack of 1 coordination across organizations and regions, 2 meaningful management and conservation objectives, and 3 rigorous sampling designs. Although many improvements to avian monitoring have been discussed, the recommendations have been slow to emerge in large-scale programs. We introduce the Integrated Monitoring in Bird Conservation Regions (IMBCR program designed to overcome the above limitations. Our objectives are to outline the development of a statistically defensible sampling design to increase the value of large-scale monitoring data and provide example applications to demonstrate the ability of the design to meet multiple conservation and management objectives. We outline the sampling process for the IMBCR program with a focus on the Badlands and Prairies Bird Conservation Region (BCR 17. We provide two examples for the Brewer's sparrow (Spizella breweri in BCR 17 demonstrating the ability of the design to 1 determine hierarchical population responses to landscape change and 2 estimate hierarchical habitat relationships to predict the response of the Brewer's sparrow to conservation efforts at multiple spatial scales. The collaboration across organizations and regions provided economy of scale by leveraging a common data platform over large spatial scales to promote the efficient use of monitoring resources. We designed the IMBCR program to address the information needs and core conservation and management objectives of the participating partner organizations. Although it has been argued that probabilistic sampling designs are not practical for large-scale monitoring, the IMBCR program provides a precedent for implementing a statistically defensible sampling design from local to bioregional scales. We demonstrate that integrating conservation and management objectives with rigorous

  14. How Do District Management and Implementation Strategies Relate to the Quality of the Professional Development That Districts Provide to Teachers?

    Science.gov (United States)

    Desimone, Laura; Porter, Andrew C.; Birman, Beatrice F.; Garet, Michael S.; Yoon, Kwang Suk

    2002-01-01

    Examined policy mechanisms and processes that districts used to provide high quality inservice professional development to teachers. Data from a national probability sample of professional development coordinators in districts that received federal funding for professional development highlighted specific management and implementation strategies…

  15. Implementation of Enterprise Risk Management (ERM Framework in Enhancing Business Performances in Oil and Gas Sector

    Directory of Open Access Journals (Sweden)

    Sanmugam Annamalah

    2018-01-01

    Full Text Available This study empirically investigated the ERM Implementation model and proposed framework to identify and manage risks in Oil and Gas Sector in Malaysia. The study examined the role of ERM framework implementation in improving business performance by utilizing Economic Value Added as a measurement tool. The study also provides insights to the Oil and Gas Sector to gain higher profit returns, reduce cost of capital, and improve shareholders value. Moreover, it contributes significantly in the field of Enterprise risk management in Malaysia. The identification and management of risk is significant to organizations in managing risks efficiently. Expectations of stakeholders of the organization are high from executives and board of directors in managing the risk effectively. Linear regression analysis is utilized in analyzing the data obtained from the data collection performed for this paper. Purposive sampling has been employed in order to select the firms that are operating in Malaysian oil and gas sector. Primary data has been utilized to collect data with the help of structured questions and interview techniques that involve semi structured questions. The results of the regression analysis conducted for in this study suggested that a significant and positive relationship between Enterprise Risk Management with operational risk; market risk; political risk; health, safety and environmental risk; and, also business performance.

  16. Integrated corridor management : implementation guide and lessons learned.

    Science.gov (United States)

    2012-02-01

    This implementation guide is intended for use by adopters of integrated corridor management (ICM) approaches and strategies to address congestion and travel time reliability issues within specific travel corridors. It introduces the topic of ICM and ...

  17. Contributions of the PMBok to the Project Management of an ERP System Implementation

    Directory of Open Access Journals (Sweden)

    Rui Manuel da Silva Gomes

    2013-12-01

    Full Text Available The implementation of Enterprise Resource Planning (ERP Systems has become generalized in companies and organizations, as a way to achieve the supply chain integration, to improve productivity and gain competitive advantages. Those implementations, more than simple technology projects, have revealed to be complex and time consuming business projects due to the structural and behaviour changes involved. This article analyzes, through the Project Coordinator’s point of view, two real cases of ERP implementation projects at Ibico Portuguesa, comparing the project management methodology adopted by Ibico with the Project Management Body of Knowledge (PMBoK, coming to the conclusion that the use of the PMBoK norms and best practices by the Project Manager could have been a success factor in those implementations, particularly referring to the elements that have been pointed as the most critical: planning, involvement and commitment of top management as well as stakeholders’ management.DOI:10.5585/gep.v4i2.37

  18. Mining the management literature for insights into implementing evidence-based change in healthcare.

    Science.gov (United States)

    Harlos, Karen; Tetroe, Jacqueline; Graham, Ian D; Bird, Madeleine; Robinson, Nicole

    2012-08-01

    We synthesized the management and health literatures for insights into implementing evidence-based change in healthcare drawn from industry-specific data. Because change principles based on evidence often fail to be translated into organizational practice or policy, we sought studies at the nexus of organizational change and knowledge translation. We reviewed five top management journals to identify an initial pool of 3,091 studies, which yielded a final sample of 100 studies. Data were abstracted, verified by the original authors and revised before entry into a database. We employed a systematic narrative synthesis approach using words and text to distill data and explain relationships. We categorized studies by varying levels of relevance for knowledge translation as (1) primary, direct; (2) intermediate; and (3) secondary, indirect. We also identified recurring categories of change-related organizational factors. The current analysis examines these factors in studies of primary relevance to knowledge translation, which we also coded for intervention readiness to reflect how readily change can be implemented. Preliminary Results centred on five change-related categories: Tailoring the Intervention Message; Institutional Links/Social Networks; Training; Quality of Work Relationships; and Fit to Organization. In particular, networks across institutional and individual levels appeared as prominent pathways for changing healthcare organizations. Power dynamics, positive social relations and team structures also played key roles in implementing change and translating it into practice. We analyzed journals in which first authors of these studies typically publish, and found evidence that management and health sciences remain divided. Bridging these disciplines through research syntheses promises a wealth of evidence and insights, well worth mining in the search for change that works in healthcare transformation. Copyright © 2012 Longwoods Publishing.

  19. Total quality management: Strengths and barriers to implementation and cultural adaptation

    Science.gov (United States)

    Siegfeldt, Denise V.; Glenn, Michael; Hamilton, Louise

    1992-01-01

    NASA/Langley Research Center (LaRC) is in the process of implementing Total Quality Management (TQM) throughout the organization in order to improve productivity and make the Center an even better place to work. The purpose of this project was to determine strengths and barriers to TQM being implemented and becoming a part of the organizational culture of the Human Resources Management Division (HRMD) at Langley. The target population for this project was both supervisory and nonsupervisory staff of the HMRD. In order to generate data on strengths and barriers to TQM implementation and cultural adaptation, a modified nominal group technique was used.

  20. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control

  1. Managing the Challenges of Leadership in ERP Implementations: An Exploratory Study of the Leadership Challenges Encountered by Project Managers Involved in ERP Implementation Projects

    Science.gov (United States)

    Wanjagi, James K.

    2013-01-01

    Increasingly, organizations are conducting more Enterprise Resource Planning (ERP) projects in order to promote organizational efficiencies. Meanwhile, minimal research has been conducted on the leadership challenges faced by project managers during the ERP project implementations and how these challenges are managed. The existing project…

  2. South African small and medium-sized enterprise owners’ intention to implement an environmental management system

    Directory of Open Access Journals (Sweden)

    Fredrika (Miemie W. Struwig

    2017-06-01

    Aim: This article investigates South African small and medium-sized enterprise (SME owners’ intentions to implement an environmental management system based on the theory of planned behaviour. Setting: Although large businesses are clearly of interest with respect to their environmental management, especially given their prominence in many of the most environmentally impactful sectors, the relative neglect of the environmental management of SMEs is disconcerting, given their overall importance in most economies. In addition, very little research used the theory of planned behaviour to empirically test SME owners’ intentions, to implement an environmental management system. Method: A quantitative survey was used to collect primary data from 326 SME owners by a structured questionnaire. Results: Regression analysis results confirmed the influence of SME owners’ attitudes towards an environmental management system and pro-environmental norms on their intention to implement an environmental management system. Perceived behavioural control, however, did not significantly influence the SME owners’ intention to implement an environmental management system. Conclusion: These findings provide valuable insights into the implementation of environmental management systems among South African SMEs. The theory of planned behaviour also seems to be an appropriate means to investigate the intentions of SMEs to implement an environmental management system.

  3. IT Security Management Implementation Model in Iranian Bank Industry

    Directory of Open Access Journals (Sweden)

    Mona Vanaki

    2017-06-01

    Full Text Available According to the complexity and differences between Iranian banks and other developed countries the appropriate actions to implement effective security management of information technology have not been taken. The aim of this study was to create a powerful model by selecting the appropriate security controls to protect information assets in the bank. In this model, at first the principle set fort in ISO standard 27001, was extracted and then by further studies derived from best practices carried out in the world on the related subject from 2008 to 2016 using a qualitative descriptive method, points comply with information security management in the banking industry were added to it. With the study of Iranian banks in dealing with IT security management system and with help of action research tools, provisions which prevent the actual implementation of this standard was removed and finally a conceptual model with operating instructions and considering all the principles of information security management standard, as well as banking institutions focusing on the characteristics of Iran was proposed.

  4. A preliminary study for the implementation of general accident management strategies

    International Nuclear Information System (INIS)

    Yang, Soo Hyung; Kim, Soo Hyung; Jeong, Young Hoon; Chang, Soon Heung

    1997-01-01

    To enhance the safety of nuclear power plants, implementation of accident management has been suggested as one of most important programs. Specially, accident management strategies are suggested as one of key elements considered in development of the accident management program. In this study, generally applicable accident management strategies to domestic nuclear power plants are identified through reviewing several accident management programs for the other countries and considering domestic conditions. Identified strategies are as follows; 1) Injection into the Reactor Coolant System, 2) Depressurize the Reactor Coolant System, 3) Depressurize the Steam Generator, 4) Injection into the Steam Generator, 5) Injection into the Containment, 6) Spray into the Containment, 7) Control Hydrogen in the Containment. In addition, the systems and instrumentation necessary for the implementation of each strategy are also investigated

  5. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  6. US nuclear industry approach to severe accident management guidance development and implementation

    International Nuclear Information System (INIS)

    Modeen, D.; Walsh, L.; Oehlberg, R.

    1992-01-01

    The purpose of this paper is to discuss the US nuclear industry activities, occurring under the auspices of Nuclear Management and Resources Council (NUMARC), to define, develop and implement enhancements to utility accident management capabilities. This effort consists of three major parts: (1) Development of a practical framework for evaluation of plant-specific accident management capabilities and the subsequent implementation of selected enhancements. (2) Development of specific technical guidance that address arresting core damage if it begins, either in-vessel or ex-vessel, and maintaining containment integrity. Preventing inadequate core cooling or minimizing the consequences of offsite releases, while considered to be candidate areas for accident management enhancements, have been the subject of intense previous study and development. (3) Plant-specific implementation of accident management enhancements in three areas: (a) personnel resources (organization, training, communications); (b) systems and equipment (restoration and repair, instrumentation, use of alternatives); and (c) information resources (procedures and guidance, technical information, process information)

  7. DIFFERENCES IN MANAGER ASSESSMENTS OF ISO 14000 STANDARD IMPLEMENTATION IN TURKEY

    Directory of Open Access Journals (Sweden)

    Sıtkı Gözlü

    2005-12-01

    Full Text Available This study reports the results of a survey about the improvements achieved as result of ISO 14000 Environmental Management System (EMS standard implementation and the differences of improvements with respect to firm characteristics. A survey has been conducted in order to explain the improvements related to environmental management process and overall firm performance. The survey involved sixty-six enterprises implementing ISO 14000 EMS standard in Turkey. In order to assess improvements obtained from ISO 14000 EMS implementation, statements related to environmental management process and overall firm performance indicators have been prepared. The statements in this study are relevant to previous research. A factor analysis was employed to determine the factors of the variables explaining improvements. Nine factors have been identified related to achieved improvements, such as establishment of pro-active environmental management system, effectiveness in resource utilization, effectiveness of process control, relationships with industry and government, meeting expectations of stakeholders, demonstration of social responsibility, profitability, productivity, and competitiveness. Then, a T- test was conducted to determine the differences of managers’ assessments with respect to certain firm characteristics. The findings have shown that there are differences in the assessments of improvements achieved as a result of ISO 14000 EMS standard implementation with respect to sales volume, foreign-capital possession, and ISO 14000 EMS standard implementation. On the other hand, industrial sector, age of establishment, and export orientation are not statistically significant for the differences in the assessments of improvements.

  8. Principal Experiences with Crisis Management Professional Development, Collaboration, and Implementation of the National Incident Management System Phases of Emergency Management

    Science.gov (United States)

    Naradko, Anthony M.

    2017-01-01

    The purpose of this qualitative single-subject case study was to identify the elements critical to crisis management professional development for school principals; the factors influencing the implementation of the National Incident Management System Phases of Emergency Management (2010) for principals; and the necessary elements for fostering…

  9. How to implement Illness Management and Recovery (IMR) in mental health service settings: evaluation of the implementation strategy.

    Science.gov (United States)

    Egeland, Karina Myhren; Ruud, Torleif; Ogden, Terje; Färdig, Rickard; Lindstrøm, Jonas Christoffer; Heiervang, Kristin Sverdvik

    2017-01-01

    The purpose of this study was to evaluate the implementation strategy used in the first-phase of implementation of the Illness Management and Recovery (IMR) programme, an intervention for adults with severe mental illnesses, in nine mental health service settings in Norway. A total of 9 clinical leaders, 31 clinicians, and 44 consumers at 9 service settings participated in the implementation of IMR. Implementation was conducted by an external team of researchers and an experienced trainer. Data were gathered on fidelity to the intervention and implementation strategy, feasibility, and consumer outcomes. Although the majority of clinicians scored within the acceptable range of high intervention fidelity, their participation in the implementation strategy appeared to moderate anticipated future use of IMR. No service settings reached high intervention fidelity scores for organizational quality improvement after 12 months of implementation. IMR implementation seemed feasible, albeit with some challenges. Consumer outcomes indicated significant improvements in illness self-management, severity of problems, functioning, and hope. There were nonsignificant positive changes in symptoms and quality of life. The implementation strategy appeared adequate to build clinician competence over time, enabling clinicians to provide treatment that increased functioning and hope for consumers. Additional efficient strategies should be incorporated to facilitate organizational change and thus secure the sustainability of the implemented practice. Trial registration ClinicalTrials.gov NCT02077829. Registered 25 February 2014.

  10. Implementing Innovation: An Exploration of a Learning Management System Transition

    Science.gov (United States)

    Strawser, Michael G.; Apostel, Shawn; O' Keefe, Moira; Simons, Crystal

    2018-01-01

    Learning management systems (LMS) are fixtures on higher education campuses. As LMS use continues to increase, faculty development professionals should consider how system use is encouraged and implemented on campus, especially amongst faculty. Using Ely's (1990) technology-specific conditions that facilitate the implementation of an innovation,…

  11. Quality Management Principles and Benefits of their Implementation in Central Banks

    Directory of Open Access Journals (Sweden)

    Luburić Radoica

    2015-09-01

    Full Text Available This article discusses the principles of quality management and benefits of their implementation in central banks. It is based on new principles of quality management, in particular to: customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, and, relationship management. With a view to continuously improving their performance and achieving sustained success, central banks have a realistic opportunity to use these principles in an efficient and effective manner whereby the top management certainly holds the most responsibility. Quality management principles are analysed herein both in their original form and in terms of their implementation in the financial system and its most prominent entity - central bank. The article also incorporates new standard-related terms such as `context` and `risk-based thinking` that significantly strengthen quality management principles and contribute to a more effective and efficient achievement of sustainable success.

  12. Implementing a pain management nursing protocol for orthopaedic surgical patients: Results from a PAIN OUT project.

    Science.gov (United States)

    Cui, Cui; Wang, Ling-Xiao; Li, Qi; Zaslansky, Ruth; Li, Li

    2018-04-01

    To investigate the effect of introducing a standardised pain management nursing protocol in orthopaedic patients undergoing surgery. Postoperative pain is a common phenomenon but is still undertreated in hospitalised patients. Nurses' lack of sufficient knowledge and skills about pain management may be a contributing factor to poor outcomes. An interventional, separate sample pre- and post-test. A pain management nursing protocol was introduced and a handbook and training sessions regarding management of postsurgical pain were provided to the nurses on a Joint Orthopaedic ward at a university-affiliated general hospital in Guangzhou, China. Before and after the intervention, nurses' knowledge about pain management and attitudes were assessed, and perioperative management practices and pain-related patient-reported outcomes were evaluated. Sixteen and 15 registered nurses, and 77 and 71 patients participated in the study before and after the intervention, respectively. Nurses' scores related to knowledge and skills increased significantly after the protocol was introduced but were still insufficient with regard to pharmacological-related items. The proportion of patients receiving a combined opioid and nonopioid increased after the intervention. Clinically significant changes were observed in some patient-reported outcomes, such as worst pain since surgery, percentage of time experiencing severe pain, and pain interference with activities out of bed. There were significant changes in nonpharmacological methods administered by nurses to patients or used by patients to relieve pain. Implementation of a pain management nursing protocol combined with education in one surgical ward was associated with nurses' increased knowledge and attitudes regarding pain, a change in some management practices, and improvement in a number of pain-related patient-reported outcomes. It was feasible to develop and implement a standardised pain management nursing protocol and use it in the

  13. Towards an Effective Management Strategy for Passive RFID Implementation

    National Research Council Canada - National Science Library

    Fisch, John N; Koch, David M

    2004-01-01

    .... However, many issues central to passive RFID implementation remain unresolved. First and foremost, a comprehensive management strategy, including a complete redesign of business practices, must be developed...

  14. Implementing Earned Value Management in the CxP EVA Systems Project Office

    Science.gov (United States)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  15. Challenges in the implementation of a quality management system applied to radiometric analysis

    Energy Technology Data Exchange (ETDEWEB)

    Dias, Danila C.S.; Bonifacio, Rodrigo L.; Nascimento, Marcos R.L.; Silva, Nivaldo C. da; Taddei, Maria Helena T., E-mail: danilacdias@gmail.com [Comissao Nacional de Energia Nuclear (LAPOC/CNEN-MG), Pocos de Caldas, MG (Brazil). Laboratorio de Pocos de Caldas

    2015-07-01

    The concept of quality in laboratories has been well established as an essential factor in the search for reliable results. Since its first version published (1999), the ISO/IEC 17025 has been applied in the industrial and research fields, in a wide range of laboratorial analyses. However, the implementation of a Quality Management System still poses great challenges to institutions and companies. The purpose of this work is to expose the constraints related to the implementation of ISO/IEC 17025 applied to analytical assays of radionuclides, accomplished by studying the case of the Pocos de Caldas Laboratory of the Brazilian Commission for Nuclear Energy. In this lab, a project of accreditation of techniques involving determination of radionuclides in water, soil, sediment and food samples has been conducted since 2011. The challenges presented by this project arise from the administrative view, where the governmental nature of the institution translates into unlevelled availability resources and the organizational view, whereas QMS requires inevitable changes in the organizational culture. It is important to point out that when it comes to accreditation of analysis involving radioactive elements, many aspects must be treated carefully due to the their very particular nature. Among these concerns are the determination of analysis uncertainties, accessibility to international proficiency studies, international radioactive samples and CRM transportation, the study of parameters on the validation of analytical methods and the lack of documentation and specialized personnel regarding quality at radiometric measurements. Through an effective management system, the institution is overcoming these challenges, moving toward the ISO/IEC 17025 accreditation. (author)

  16. Challenges in the implementation of a quality management system applied to radiometric analysis

    International Nuclear Information System (INIS)

    Dias, Danila C.S.; Bonifacio, Rodrigo L.; Nascimento, Marcos R.L.; Silva, Nivaldo C. da; Taddei, Maria Helena T.

    2015-01-01

    The concept of quality in laboratories has been well established as an essential factor in the search for reliable results. Since its first version published (1999), the ISO/IEC 17025 has been applied in the industrial and research fields, in a wide range of laboratorial analyses. However, the implementation of a Quality Management System still poses great challenges to institutions and companies. The purpose of this work is to expose the constraints related to the implementation of ISO/IEC 17025 applied to analytical assays of radionuclides, accomplished by studying the case of the Pocos de Caldas Laboratory of the Brazilian Commission for Nuclear Energy. In this lab, a project of accreditation of techniques involving determination of radionuclides in water, soil, sediment and food samples has been conducted since 2011. The challenges presented by this project arise from the administrative view, where the governmental nature of the institution translates into unlevelled availability resources and the organizational view, whereas QMS requires inevitable changes in the organizational culture. It is important to point out that when it comes to accreditation of analysis involving radioactive elements, many aspects must be treated carefully due to the their very particular nature. Among these concerns are the determination of analysis uncertainties, accessibility to international proficiency studies, international radioactive samples and CRM transportation, the study of parameters on the validation of analytical methods and the lack of documentation and specialized personnel regarding quality at radiometric measurements. Through an effective management system, the institution is overcoming these challenges, moving toward the ISO/IEC 17025 accreditation. (author)

  17. Disseminating contingency management: Impacts of staff training and implementation at an opiate treatment program

    OpenAIRE

    Hartzler, Bryan; Jackson, T. Ron; Jones, Brinn E.; Beadnell, Blair; Calsyn, Donald A.

    2013-01-01

    Guided by a comprehensive implementation model, this study examined training/implementation processes for a tailored contingency management (CM) intervention instituted at a Clinical Trials Network-affiliate opioid treatment program (OTP). Staff-level training outcomes (intervention delivery skill, knowledge, and adoption readiness) were assessed before and after a 16-hour training, and again following a 90-day trial implementation period. Management-level implementation outcomes (interventio...

  18. Weight Management Preferences in a Non-Treatment Seeking Sample

    Directory of Open Access Journals (Sweden)

    Victoria B. Barry

    2013-12-01

    Full Text Available Background: Obesity is a serious public health issue in the United States, with the CDC reporting that most adult Americans are now either overweight or obese. Little is known about the comparative acceptability of available weight management approaches in non-treatment seeking samples. Method: This report presents preliminary survey data collected from an online sample on weight management preferences for 8 different weight management strategies including a proposed incentive-based program. Participants were 72 individuals (15 men, 55 women and 2 transgendered individuals who self-re-ported being overweight or obese, or who currently self-reported a normal weight but had attempted to lose weight in the past. Results: ANOVA and Pair-wise comparison indicated clear preferences for certain treatments over others in the full sample; most notably, the most popular option in our sample for managing weight was to diet and exercise without professional assistance. Several differences in preference between the three weight groups were also observed. Conclusions: Dieting and exercising without any professional assistance is the most highly endorsed weight management option among all groups. Overweight and obese individuals may find self-management strategies for weight loss less attractive than normal weight individuals, but still prefer it to other alternatives. This has implications for the development and dissemination of empirically based self-management strategies for weight.

  19. Implementation of a pharmacist-managed heart failure medication titration clinic.

    Science.gov (United States)

    Martinez, Amanda S; Saef, Jerold; Paszczuk, Anna; Bhatt-Chugani, Hetal

    2013-06-15

    The development, implementation, and initial results of a pharmacist-managed heart failure (HF) medication titration clinic are described. In a quality-improvement initiative at a Veterans Affairs health care system, clinical pharmacists were incorporated into the hospital system's interprofessional outpatient HF clinic. In addition, a separate pharmacist-managed HF medication titration clinic was established, in which pharmacists were granted an advanced scope of practice and prescribing privileges, enabling them to initiate and adjust medication dosages under specific protocols jointly established by cardiology and pharmacy staff. Pharmacists involved in the titration clinic tracked patients' daily body weight, vital signs, and volume status using telephone-monitoring technology and via patient interviews. A retrospective chart review comparing achievement of target doses of angiotensin-converting enzyme inhibitor (ACEI), angiotensin-receptor blocker (ARB), and β-blocker therapies in a group of patients (n = 28) whose dosage titrations were carried out by nurses or physicians prior to implementation of the pharmacist-managed HF medication titration clinic and a group of patients (n = 27) enrolled in the medication titration clinic during its first six months of operation indicated that target ACEI and ARB doses were achieved in a significantly higher percentage of pharmacist-managed titration clinic enrollees (52.9% versus 31%, p = 0.007). Patients enrolled in the pharmacist-managed HF medication titration clinic also had a significantly higher rate of attainment of optimal β-blocker doses (49% versus 24.7%, p = 0.012). Implementation of a pharmacist-managed HF medication titration clinic increased the percentage of patients achieving optimal ACEI, ARB, and β-blocker dosages.

  20. Can agent based models effectively reduce fisheries management implementation uncertainty?

    Science.gov (United States)

    Drexler, M.

    2016-02-01

    Uncertainty is an inherent feature of fisheries management. Implementation uncertainty remains a challenge to quantify often due to unintended responses of users to management interventions. This problem will continue to plague both single species and ecosystem based fisheries management advice unless the mechanisms driving these behaviors are properly understood. Equilibrium models, where each actor in the system is treated as uniform and predictable, are not well suited to forecast the unintended behaviors of individual fishers. Alternatively, agent based models (AMBs) can simulate the behaviors of each individual actor driven by differing incentives and constraints. This study evaluated the feasibility of using AMBs to capture macro scale behaviors of the US West Coast Groundfish fleet. Agent behavior was specified at the vessel level. Agents made daily fishing decisions using knowledge of their own cost structure, catch history, and the histories of catch and quota markets. By adding only a relatively small number of incentives, the model was able to reproduce highly realistic macro patterns of expected outcomes in response to management policies (catch restrictions, MPAs, ITQs) while preserving vessel heterogeneity. These simulations indicate that agent based modeling approaches hold much promise for simulating fisher behaviors and reducing implementation uncertainty. Additional processes affecting behavior, informed by surveys, are continually being added to the fisher behavior model. Further coupling of the fisher behavior model to a spatial ecosystem model will provide a fully integrated social, ecological, and economic model capable of performing management strategy evaluations to properly consider implementation uncertainty in fisheries management.

  1. Reduction of mercury in plant effluents data management implementation plan FY 1998 Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Fischer, K.N.; Forsberg, V.M.

    1998-01-01

    The purpose of the Data Management Implementation Plan (DMIP) is to document the requirements and responsibilities for managing, using, and archiving data used for the Reduction of Mercury in Plant Effluents (RMPE) project. The DMIP was created for the RMPE project in accordance with the guidance given in Environmental Data Management Implementation Handbook for the Environmental Restoration Program (ES/ER/TM- 88/R 1) and in ''Developing, implementing, and Maintaining Data Management Implementation Plans'' (EMEF/ER-P2216, Rev. 0). This document reflects the state of the RMPE project and the types of environmental monitoring planned as they existed through March 16, 1998. The scope of this document is the management of the RMPE project's environmental information, which includes electronic or hard copy records describing environmental processes or conditions. The RMPE program was established as a best management practice to address sources in the Y-12 Plant that contribute mercury to plant effluents being discharged to Upper East Fork Poplar Creek. The strategy is multifaceted: reroute clean water through clean conduits; clean, reline, and/or replace mercury-contaminated water conduits; eliminate or reduce accumulations of mercury in tanks and sumps; isolate inaccessible mercury from contact with water; and install treatment capability for streams where the source(s) cannot be eliminated or mitigated to acceptable levels. The RMPE project database consists of data from surface water monitoring and sediment sampling at locations of interest within the Y-12 Plant. This DMIP describes the types and sources of RMPE data, other data systems relevant to the RMPE project, the different data management interactions and flow of information involved in processing RMPE data, and the systems used in data management

  2. Practical applications approach to design, development and implementation of an integrated management system

    International Nuclear Information System (INIS)

    Holdsworth, Rodger

    2003-01-01

    The introduction of quality, risk, safety, health and environmental management philosophies has significantly changed industry's view of company organization and controlling processes. Quality, risk, safety, health and environmental programs and systems, such as ISO 9000, ISO 14000, process safety, and risk management are impacting the way industry will meet the challenges of safety and environmental risks and the needs of the customer in the future. A wealth of knowledge has been extracted from practical application case studies, which would otherwise be unobtainable without years of experience related to management systems design, development, implementation and control. This paper discusses a practical applications approach to design, develop and implement an integrated management system encompassing quality (ISO 9000), process safety management (CFR 29 1910.119), risk management programs (CFR 40 part 68), environmental management (ISO 14000), and safety and health. This paper includes a discussion of management systems integration and an overview of management systems standards that apply to the petrochemical and chemical manufacturers industries. The paper also provides an overview on integrating management systems, including issues related to the following topics: - Establishing a management system team and objectives. - Assessing and knowing your organization. - Designing the management system to meet site objectives. - Developing system documentation. - Implementing effective management systems. - Measuring program performance. - Continuous improvement

  3. Using information management to implement a clinical resource management program.

    Science.gov (United States)

    Rosenstein, A H

    1997-12-01

    This article provides a consultant's account of a 250-bed community hospital's experience in implementing the Clinical Resource Management (CRM) program, a four-stage process of using information to identify opportunities for improvement, developing an effective resource management team, implementing process improvement activities, and measuring the impact on outcomes of care. CASE STUDY EXAMPLE--CONGESTIVE HEART FAILURE: The chair of the departments of internal medicine and family practice selected congestive heart failure for in-depth study. A task force focused on treatment and patient disposition in the emergency room (ER), where most of the nonelective admissions originated. A set of standardized ER orders was developed that emphasized rapid and effective diuresis through the initiation of a progressive diuretic dosing schedule directly linked to patient response. Factors critical to the success of the CRM program included allocating adequate time to promote and sell the value and importance of the program, as well as securing the support of both information systems and physicians. The main barriers to success involved limitations in the information system infrastructure and delays attributable to committee review. Short-term results from the CRM program were encouraging, with average lengths of stay reduced by 0.5 days and average costs of care reduced by 12% for the ten diagnoses studied with no adverse results. Nonstudy diagnoses showed no notable improvement. Recognizing the growing importance of information management not only for clinical decision support but for accommodating all the necessary internal and external reporting requirements will require a significant commitment and investment in technology and personnel resources.

  4. Sampling quality assurance guidance in support of EM environmental sampling and analysis activities

    International Nuclear Information System (INIS)

    1994-05-01

    This document introduces quality assurance guidance pertaining to the design and implementation of sampling procedures and processes for collecting environmental data for DOE's Office of EM (Environmental Restoration and Waste Management)

  5. Risk Management method to ERP systems implementation based os critical sucess factors

    Directory of Open Access Journals (Sweden)

    Márcio Saez Caputo

    2004-10-01

    Full Text Available From the second half of years 90, the Enterprise Resource Planning (ERP systems implementation appears like one of the main investment focus related to the use of information technology in the companies, which aimed to acquire competitive advantages through cost reduction and differentiation of products with the use of these systems. ERP implementation showed to be much more than a technology project, involving structural and managing changes, becoming a complex and high risk process for the organizations. In the literature specialized on ERP, there are many examples of the difficulties of this type of project and about implementations that had not reached the expected objectives, frustrating the expectations of the contractors. The present work describes, first of all, the development of a risk management method to ERP systems implementation, based on critical success factors. Then, a case of application of the considered method is analyzed, detailing the steps and the results gotten until the moment. To the end, evidences regarding to how the method helps to improve risk management during ERP implementations are presented.

  6. A preliminary study for the implementation of general accident management strategies

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Soo Hyung; Kim, Soo Hyung; Jeong, Young Hoon; Chang, Soon Heung [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

    1998-12-31

    To enhance the safety of nuclear power plants, implementation of accident management has been suggested as one of most important programs. Specially, accident management strategies are suggested as one of key elements considered in development of the accident management program. In this study, generally applicable accident management strategies to domestic nuclear power plants are identified through reviewing several accident management programs for the other countries and considering domestic conditions. Identified strategies are as follows; 1) Injection into the Reactor Coolant System, 2) Depressurize the Reactor Coolant System, 3) Depressurize the Steam Generator, 4) Injection into the Steam Generator, 5) Injection into the Containment, 6) Spray into the Containment, 7) Control Hydrogen in the Containment. In addition, the systems and instrumentation necessary for the implementation of each strategy are also investigated. 11 refs., 3 figs., 3 tabs. (Author)

  7. A preliminary study for the implementation of general accident management strategies

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Soo Hyung; Kim, Soo Hyung; Jeong, Young Hoon; Chang, Soon Heung [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

    1997-12-31

    To enhance the safety of nuclear power plants, implementation of accident management has been suggested as one of most important programs. Specially, accident management strategies are suggested as one of key elements considered in development of the accident management program. In this study, generally applicable accident management strategies to domestic nuclear power plants are identified through reviewing several accident management programs for the other countries and considering domestic conditions. Identified strategies are as follows; 1) Injection into the Reactor Coolant System, 2) Depressurize the Reactor Coolant System, 3) Depressurize the Steam Generator, 4) Injection into the Steam Generator, 5) Injection into the Containment, 6) Spray into the Containment, 7) Control Hydrogen in the Containment. In addition, the systems and instrumentation necessary for the implementation of each strategy are also investigated. 11 refs., 3 figs., 3 tabs. (Author)

  8. The role of human resource management in the process of total quality management implementation

    Directory of Open Access Journals (Sweden)

    Milovanović Vesna

    2014-01-01

    Full Text Available Total quality management (TQM is a holistic philosophy of striving for continuous quality improvement of all processes in the company. This requires the involvement of employees and encouraging them to make proposals, take responsibility and make decisions. Successful implementation of TQM is largely determined by the quality of human resources management (HRM, which should ensure employees' commitment to continuous process improvement. Previous studies worldwide have shown that the effects of this sophisticated philosophy depend on the motivation of employees, which is created through training and rewards, financial and non-financial. The aim of this paper is to present the way in which HRM determines the effectiveness of TQM implementation, and to provide guidelines for improving such effectiveness. The paper presents the results of empirical analysis in hotels in Serbia in order to determine the value of TQM factors related to human resources. The results show that hotels must firstly improve TQM staff factors before taking action to implement TQM philosophy.

  9. DECISIVE FACTORS OF TALENT MANAGEMENT IMPLEMENTATION IN CZECH ORGANISATIONS

    Directory of Open Access Journals (Sweden)

    Adéla Fajčíková

    2018-03-01

    Full Text Available The effort of every organisation is to have talented staff, and in the case that these employees are available in the organisation is to ensure they are motivated to stay in the organisation. The aim of the paper is to evaluate the influence of decisive factors on the implementation of activities relating to talent management and the approach of Czech organisations to this new trend as well. Data was obtained through questionnaire surveys in selected Czech organisations in 2014/2015 (n = 389, 2015/2016 (n = 402 and in 2016/2017 (n = 207. The results showed that the chances to implement talent management were significantly higher for organisations operating in national or international markets, organisations with more than 50 employees and organisations with a separate HR department, where this chance was even 4.1 times higher. Surveyed organisations use talent management the most often in the areas of employees´ recruitment, employees´ training and development, and their evaluation and remuneration.

  10. Implementation of severe accident management measures - Summary and conclusions

    International Nuclear Information System (INIS)

    2002-01-01

    The objectives of the meeting were: 1) to exchange information on activities in the area of SAM implementation and on the rationale for such actions, 2) to monitor progress made, 3) to identify cases of agreement or disagreement, 4) to discuss future orientations of work, 5) to make recommendations to the CSNI. Session summaries prepared by the Chairpersons and discussed by the whole writing group are given in Annex. During the first session, 'SAM Programmes Implementation', papers from one regulator and several utilities and national research institutes were presented to outline the status of implementation of SAM programmes in countries like Switzerland, Russia, Spain, Finland, Belgium and Korea. Also, the contribution of SAM to the safety of Japanese plants (in terms of core damage frequency) was quantified in a paper. One paper gave an overview on the situation regarding SAM implementation in Europe. The second session, 'SAM Approach', provided background and bases for Severe Accident Management in countries like Sweden, Japan, Germany and Switzerland, as well as for hardware features in advanced light water reactor designs, such as the European Pressurised Reactor (EPR), regarding Severe Accident Management. The third session, 'SAM Mitigation Measures', was about hardware measures, in particular those oriented towards hydrogen mitigation where fundamentally different approaches have been taken in Scandinavian countries, France, Germany and Korea. Three papers addressed specific contributions from research to provide a broader basis for the assumptions made in certain computer codes used for the assessment of plant risk arising from beyond-design accident sequences. The fourth session, 'Implementation of SAM Measures on VVER-1000 Reactors', was about the status of work on Severe Accident Management implementation in VVER reactors of existing design and in a new plant currently under construction. The overall picture is that Severe Accident Management has been

  11. Managing social-ecological systems under uncertainty: implementation in the real world

    Directory of Open Access Journals (Sweden)

    Ana Nuno

    2014-06-01

    Full Text Available Management decisions for natural resources are not made in a vacuum; the environmental and ecological conditions as well as the socioeconomic and political contexts affect goals, the choice of interventions, their feasibility, and which outcomes are obtained. Although uncertainty is recognized as a feature of natural resource management, little attention has been given to the uncertainty generated by institutional settings, historical contingency, and individual people's influence. These implementation uncertainties, related to the translation of policy into practice, make it difficult to predict the outcomes of management interventions within social-ecological systems. Using the conservation of species hunted for bushmeat in the Serengeti as a case study, we investigated the challenges and potential barriers to successful implementation of natural resource management policies. We used a mixed-methods approach, combining semistructured interviews with scenario building, social network, and institutional analysis exercises. Using a management strategy evaluation (MSE conceptual framework, we obtained insights into the constraints and opportunities for fulfilling stakeholder aspirations for the social-ecological system, analyzed the multiple roles played by different institutions in the system, and described the interactions between different actor types. We found that the respondents had generally similar views about the current and future status of the Serengeti but disagreed about how to address issues of conservation concern and were more uncertain about the actual outcomes of management interventions. Improving conservation implementation (rather than research, monitoring, or status assessment was perceived as the key priority to be addressed. Institutional barriers were perceived as an important challenge given that the decision-making and implementation processes were broadly distributed across a number of institutions. Conservation social

  12. Environmental and Social Management System Implementation Handbook : Crop Production

    OpenAIRE

    International Finance Corporation

    2014-01-01

    This Handbook is intended to be a practical guide to help companies in the crop production industry develop and implement an environmental and social management system, which should help to improve overall operations. If a company has existing management systems for quality or health and safety, this Handbook will help to expand them to include environmental and social performance. Sectio...

  13. Life Cycle Management at Brødrene Hartmann A/S - strategy,- organisation and implementation

    DEFF Research Database (Denmark)

    Pedersen, Claus Stig; Alting, Leo; Mortensen, Anna Lise

    1997-01-01

    decisionmaking is under development.The implementation of life cycle management in Hartmann is organised with respect to the divisional areas: strategic management, product development, purchase, production, sale and distribution. The implementation of life cycle managment is assisted by tools to support...... decision making. The tools are developed in coorporation with the Department of Manufacturing Engineering at the Technical University of Denmark.This paper presents- The Hartmann environmental strategy, based on the life cycle concept- Experiences and results from developing a life cycle orientated...... organisation- Experiences and results from developing and implementing tools for life cycle management...

  14. Implementation of Sample Graphic Patterns on Derived Scientific/Technologic Documentary Figures

    Institute of Scientific and Technical Information of China (English)

    MENG Xiang-bao; WANG Xiao-yu; WANG Lei

    2013-01-01

    The presenting work deals with implementation of sample graphic patterns derived from published scientific/technologic documentation figures on numeric simulation of multiphase flow and FEM analysis of thin walled mechanical structures. First, geometric plane patterns in rectangular/circular form were demonstrated in contrast to gradual change style in color and graphic configuration. Next, selected artistic/graphic sample patterns were implemented in logo conceptual design and visual innovation storming. The way in editing the above original figures is 2D symmetry, rectangular array geometrically, and converting them in inverse color in software like PS. The objective of this work is to cultivate, explore and discipline trainees’ visual ability in artistic/aesthetic appreciation, graphic communication and industrial design and application, thus laying ties closely among comprehensive university students from different majors on science, engineering, arts and humanity.

  15. Implementing process safety management in gas processing operations

    International Nuclear Information System (INIS)

    Rodman, D.L.

    1992-01-01

    The Occupational Safety and Health Administration (OSHA) standard entitled Process Safety Management of Highly Hazardous Chemicals; Explosives and Blasting Agents was finalized February 24, 1992. The purpose of the standard is to prevent or minimize consequences of catastrophic releases of toxic, flammable, or explosive chemicals. OSHA believes that its rule will accomplish this goal by requiring a comprehensive management program that integrates technologies, procedures, and management practices. Gas Processors Association (GPA) member companies are significantly impacted by this major standard, the requirements of which are extensive and complex. The purpose of this paper is to review the requirements of the standard and to discuss the elements to consider in developing and implementing a viable long term Process Safety Management Program

  16. THE IMPLEMENTATION OF THE INTEGRATED MANAGEMENT SYSTEMS IN TOURIST PENSION

    Directory of Open Access Journals (Sweden)

    Elena G. CONDREA

    2014-04-01

    Full Text Available We can say that you cannot maintain yourself on the current market of rural tourism operators unless you provide customers with quality products and services, prepared foods safe for consumption, and, not least, if you do not prove you are concerned with ensuring a healthy and clean environment, environmental protection. In this paper we intend to present some aspects of implementing an integrated management system of quality - food security - the average level of tourist pension, and highlight the benefits brought by this ongoing process to the respective operators in rural tourism. To this end, we studied the standards, references available in this area, and documents produced within guesthouses with the implementation of various management systems components of an integrated quality - environment - food security management system.

  17. Customer relationship management implementation in the small and medium enterprise

    Science.gov (United States)

    Nugroho, Agus; Suharmanto, Agus; Masugino

    2018-03-01

    To win the global competition and sustain the business, small and medium enterprise shall implement a reliable information technology application to support their customer data base, production and sales as well as marketing management. This paper addresses the implementation of Customer Relationship Management (CRM) in small and medium enterprise, CV. Densuko Jaya. It is a small and medium enterprises in Semarang, Central Java, Republic of Indonesia deal with rubber processing industry supply chain. ADDIE model utilized in study to setup the CRM functionality at these enterprises. The aim of the authors is to present the benefits resulting from the application of CRM technologies at these enterprises to solve their chronicle issues in the field of integrated customer data base, production management process and sales automation in order to boost their business in the near future. Training and coaching have been delivered to the enterprises staffs and management to ensure that they can execute the system.

  18. Determinants of quality management systems implementation in hospitals

    NARCIS (Netherlands)

    Wardhani, Viera; Utarini, Adi; van Dijk, Jitse Pieter; Post, Doeke; Groothoff, Johan Willem

    Objective: To identify the problems and facilitating factors in the implementation of quality management system (QMS) in hospitals through a systematic review. Method: A search strategy was pet-formed on the Medline database for articles written in English published between 1992 and early 2006.

  19. Information for Participants Implementing Integrated Pest Management in Schools

    Science.gov (United States)

    Parents, school faculty and staff, school administrators, and pest management professionals all have important roles in planning and implementing school IPM. Find out about these roles and resources available to help.

  20. Large scale sample management and data analysis via MIRACLE

    DEFF Research Database (Denmark)

    Block, Ines; List, Markus; Pedersen, Marlene Lemvig

    Reverse-phase protein arrays (RPPAs) allow sensitive quantification of relative protein abundance in thousands of samples in parallel. In the past years the technology advanced based on improved methods and protocols concerning sample preparation and printing, antibody selection, optimization...... of staining conditions and mode of signal analysis. However, the sample management and data analysis still poses challenges because of the high number of samples, sample dilutions, customized array patterns, and various programs necessary for array construction and data processing. We developed...... a comprehensive and user-friendly web application called MIRACLE (MIcroarray R-based Analysis of Complex Lysate Experiments), which bridges the gap between sample management and array analysis by conveniently keeping track of the sample information from lysate preparation, through array construction and signal...

  1. Implementation of a change management solution based on a product lifecycle management system for a large international project

    International Nuclear Information System (INIS)

    Luehr, Anneke

    2011-08-01

    This Thesis describes the implementation of a Change Management solution based on a Product Lifecycle Management System (PLM System) for a large international project. The objective of Change Management is to ensure a systematic line of action for approving and implementing changes in the project. The Deutsches Elektronen-Synchrotron DESY is one of the world's leading accelerator centres with locations in Hamburg and Zeuthen. Currently, DESY participates in the realization of the international research facility European X-Ray Free-Electron Laser (XFEL) at the Hamburg site. DESY was responsible for the planning of the XFEL. When the project entered the construction phase it was internationalized and now comprises project groups in 12 countries. Thus the requirements on Change Management have changed, as participants from several labs at many different locations are now involved. First the project scope is described and then a target process for the Change Management solution is developed by a requirement analysis. Afterwards the technical implementation of this process in DESY's PLM System is described and the Change Management solution is tested. The process is visualized using the Unified Modeling Language (UML). Finally a description is given of how to transfer the solution to the project

  2. Implementation of a Computerized Maintenance Management System

    Science.gov (United States)

    Shen, Yong-Hong; Askari, Bruce

    1994-01-01

    A primer Computerized Maintenance Management System (CMMS) has been established for NASA Ames pressure component certification program. The CMMS takes full advantage of the latest computer technology and SQL relational database to perform periodic services for vital pressure components. The Ames certification program is briefly described and the aspects of the CMMS implementation are discussed as they are related to the certification objectives.

  3. Strengthening the regulatory system through the implementation and use of a quality management system

    Directory of Open Access Journals (Sweden)

    Reinhold Eisner

    2017-04-01

    Full Text Available ABSTRACT Quality management systems (QMS, based on ISO 9001 requirements, are applicable to government service organizations such as Health Canada’s Biologics and Genetic Therapies Directorate (BGTD. This communication presents the process that the BGTD followed since the early 2000s to implement a quality management system and describes how the regulatory system was improved as a result of this project. BGTD undertook the implementation of a quality management system based on ISO 9001 and containing aspects of ISO 17025 with the goal of strengthening the regulatory system through improvements in the people, processes, and services of the organization. We discuss the strategy used by BGTD to implement the QMS and the benefits that were realized from the various stages of implementation. The eight quality principals upon which the QMS standards of the ISO 9000 series are based were used by senior management as a framework to guide QMS implementation.

  4. Implementation of the ISO 9001 quality management system - process, impact and benefits

    Directory of Open Access Journals (Sweden)

    Aleksandar Ž. Drenovac

    2013-10-01

    Full Text Available Modern business is characterized by greater and greater market competition through all business areas and all activities. Establishment of market positions is a very important element of business activities in every organization. Quality of products and/or services provides recognizability at market and raising of ratings. Implementation of the ISO 9001 quality management system opens positions for secure national and international markets; it is also an identifier of an efficiently and effectively process-wise organized system in an organization. Introduction An increase of impact of quality and demands for ensuring quality before contract approvals has been visible lately. All vendors at the multinational market must ensure confidence in the quality of their products or services in order to satisfy customer demands which is an ultimate goal. Organizations which have the certificated ISO 9001 standard are known for their persistence and reliability, so they reach high reputation by applying  the standard. Implementation of a quality management system Implementation of a quality management system is done by system engineering, as a process based on a top management decision. It can be applied through the engagement of professionals from within the organization, as well as through outsourced consultants. The process is based on the PDCA cycle and the eight principles of quality management in an ISO 9001 organization. Defining assignments in accordance with the standard The Quality Manual, as a document which contains quality aims and through which a complete model of the quality management system is described, should be an initial element for the process of implementing a quality management system. It contains an overview of all procedures and directions used for achieving quality policy, i.e. for the implementation of a quality management system in every part of a business system. Implementation of procedures When the Quality manual is created

  5. NEPA implementation: The Department of Energy's program to manage spent nuclear fuel

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1994-05-01

    The Department of Energy (DOE) is implementing the National Environmental Protection Act (NEPA) in its management of spent nuclear fuel. The DOE strategy is to address the short-term safety concerns about existing spent nuclear fuel, to study alternatives for interim storage, and to develop a long-range program to manage spent nuclear fuel. This paper discusses the NEPA process, the environmental impact statements for specific sites as well as the overall program, the inventory of DOE spent nuclear fuel, the alternatives for managing the fuel, and the schedule for implementing the program

  6. Managing Change: the people side of implementing CRM processes

    OpenAIRE

    Hann, David

    2006-01-01

    This report has been produced with the remit of analysing the people side of change management with regard to a Customer Relationship Management (CRM) process implementation at Jupiter Design (Jupiter). An increasing churn of clients and 12- years of growth has made Jupiter realise they must maximise revenues from existing clients. The adoption of a CRM approach has been suggested as a possible solution.

  7. Patterns of Technochange Management in ERP Multisite Implementations

    DEFF Research Database (Denmark)

    Carugati, Andrea; Gibson, Cyrus; Mola, Lapo

    2009-01-01

    % of the total costs of implementation, small in comparison to installation and testing (45%) and, most significantly, deployment or actually achieving effective use of technology (36%). Douplaga and Astani [7] in a survey conducted among companies of various size to discovered the major issues concerning ERP......, customizations and training. This study focus therefore on the knowledge and training issues in multisite ERP implementations and proposes a contingent approach to implementation strategies in accordance to the level of knowledge possessed by the company in the ERP technology. ...... problems in getting business results from pervasive IT-related "technochanges". Technochange [4] refers to big, technology-driven, technology-dependent change seeking significant strategic benefits and requiring significant organizational change. From the management point of view these projects differ from...

  8. Practical implementation of a quality management system in a radiological department

    International Nuclear Information System (INIS)

    Huber, S.; Zech, C.J.

    2011-01-01

    This article describes the architecture of a project aiming to implement a DIN EN ISO 9001 quality management system in a radiological department. It is intended to be a practical guide to demonstrate each step of the project leading to certification of the system. In a planning phase resources for the implementation of the project have to be identified and a quality management (QM) group as core team has to be formed. In the first project phase all available documents have to be checked and compiled in the QM manual. Moreover all relevant processes of the department have to be described in so-called process descriptions. In a second step responsibilities for the project are identified. Customer and employee surveys have to be carried out and a nonconformity management system has to be implemented. In this phase internal audits are also needed to check the new QM system, which is finally tested in the external certification audit with reference to its conformity with the standards. (orig.) [de

  9. [Practical implementation of a quality management system in a radiological department].

    Science.gov (United States)

    Huber, S; Zech, C J

    2011-10-01

    This article describes the architecture of a project aiming to implement a DIN EN ISO 9001 quality management system in a radiological department. It is intended to be a practical guide to demonstrate each step of the project leading to certification of the system. In a planning phase resources for the implementation of the project have to be identified and a quality management (QM) group as core team has to be formed. In the first project phase all available documents have to be checked and compiled in the QM manual. Moreover all relevant processes of the department have to be described in so-called process descriptions. In a second step responsibilities for the project are identified. Customer and employee surveys have to be carried out and a nonconformity management system has to be implemented. In this phase internal audits are also needed to check the new QM system, which is finally tested in the external certification audit with reference to its conformity with the standards.

  10. Integrated management systems. Advantages and disadvantages; difficulties and recommendations in the process of implementation

    Directory of Open Access Journals (Sweden)

    Aneta Wysokińska-Senkus

    2011-01-01

    Full Text Available Nowadays, organisations are constantly looking for methods to improve their efficiency and to guarantee them a competitive advantage, sustainable profitable growth and ability to survive in a turbulent environment. An increasing popularity of implementation of certified management systems has been noticed. The most often integrated management system are eg. ISO 9001, ISO 14001, ISO 18001. The paper presents the conditions for the implementation of an integrated management system (IMS, the characteristics of the most integrated management systems, the advantages and disadvantages of integration and the difficulties in the implementation of IMS and recommendations regarding the effectiveness of the integration of IMS.

  11. Factors that influence producer decisions to implement management strategies.

    Science.gov (United States)

    Field, Thomas G

    2014-12-01

    Cow-calf enterprises in the USA are widely divergent in size, locale, resource availability, management skill, and market focus. Furthermore, variation exists in dependence on the cow-calf enterprise as a primary source of income, perception about the utility of a particular management practice or technology, and assessment of cost: benefit resulting from implementation impact decisions. Enterprises with larger cow inventories, greater dependence on income from the cattle enterprise, and that retain ownership further into the supply chain beyond the cow-calf operation are more likely to institute management protocols such as vaccination programs, defined calving seasons, and reproductive technologies. Successful cow-calf managers place the highest priority on herd nutrition, pasture and range management, herd health, financial management marketing, production management, and genetics. Management practices are more likely to be adopted when they align with a manager's perception of the utility, labor availability, favorable cost: benefit outcomes and profit motivation.

  12. Freescale Semiconductor Successfully Implements an Energy Management System

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-06-30

    Through the Superior Energy Performance (SEP) plant certification program, Freescale Semiconductor implemented projects at the company's Oak Hill Fab plant that reduced annual energy consumption by 28 million kilowatt hours (kWh) of electricity and 26,000 million British thermal units (Btu) of natural gas between 2006 and 2009, saving more than $2 million each year. The plant is now certified at the SEP silver level, and has a management system in place to proactively manage the facility's energy resources in the future.

  13. Implementation of quality management for clinical bacteriology in low-resource settings.

    Science.gov (United States)

    Barbé, B; Yansouni, C P; Affolabi, D; Jacobs, J

    2017-07-01

    The declining trend of malaria and the recent prioritization of containment of antimicrobial resistance have created a momentum to implement clinical bacteriology in low-resource settings. Successful implementation relies on guidance by a quality management system (QMS). Over the past decade international initiatives were launched towards implementation of QMS in HIV/AIDS, tuberculosis and malaria. To describe the progress towards accreditation of medical laboratories and to identify the challenges and best practices for implementation of QMS in clinical bacteriology in low-resource settings. Published literature, online reports and websites related to the implementation of laboratory QMS, accreditation of medical laboratories and initiatives for containment of antimicrobial resistance. Apart from the limitations of infrastructure, equipment, consumables and staff, QMS are challenged with the complexity of clinical bacteriology and the healthcare context in low-resource settings (small-scale laboratories, attitudes and perception of staff, absence of laboratory information systems). Likewise, most international initiatives addressing laboratory health strengthening have focused on public health and outbreak management rather than on hospital based patient care. Best practices to implement quality-assured clinical bacteriology in low-resource settings include alignment with national regulations and public health reference laboratories, participating in external quality assurance programmes, support from the hospital's management, starting with attainable projects, conducting error review and daily bench-side supervision, looking for locally adapted solutions, stimulating ownership and extending existing training programmes to clinical bacteriology. The implementation of QMS in clinical bacteriology in hospital settings will ultimately boost a culture of quality to all sectors of healthcare in low-resource settings. Copyright © 2017 The Authors. Published by

  14. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  15. Implementing Moodle for e-learning for a successful knowledge management strategy

    Directory of Open Access Journals (Sweden)

    Dana Tessier

    2016-09-01

    Full Text Available A knowledge management strategy was implemented in a call centre organization. Part of this strategy included an e-learning tool ‘Moodle’ to support employee training and knowledge management (KM initiatives. The research looked at the ways in which the e-learning tool could be used to help successfully implement the knowledge management strategy – specifically, to improve knowledge transfer between employees, improve individual and organizational performance and have a better understanding of the critical success factors involved for the KM strategy. The study analyzed three different methods of knowledge transfer to determine which resulted in the highest frequency of use for the knowledge repository. The results showed that by using e-learning, the knowledge repository had a high frequency of use and this shows that e-learning was a successful method of knowledge transfer. To keep employees functioning at an optimal level, employers will need to ensure knowledge management, training, and performance management strategies are aligned, measurable and maximized.

  16. Designing and Implementing Teacher Performance Management Systems: Pitfalls and Possibilities

    Science.gov (United States)

    Wiener, Ross; Jacobs, Ariel

    2011-01-01

    As new performance-management-related policies go from idea to implementation, policy makers and education leaders will be called upon to flesh-out what are still broad principles in many areas. This represents a significant inflection point for the teaching profession and the management of public school systems. Early decisions will determine…

  17. Implementation of the best in class project management and contract management initiative at the Department Of Energy's Office Of Environmental Management - 16062

    International Nuclear Information System (INIS)

    Van Camp, Scott G.; Stevenson, Jeremy S.; Deiters, Michael G.; Jamison, Timothy P.

    2009-01-01

    Since its creation in 1989, the Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project management and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. EM has committed itself to improving project performance and undertaken a number of proactive management initiatives including the development of a 'Best in Class' Project Management and Contract Management organization (i.e., the BICPM Initiative). During 2007, EM assessed the status of project management and contract management at 15 EM sites. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and three contract management benchmarks. The January 2008 Compilation Assessment Report showed that EM faces significant challenges in its mission execution due to staffing shortages, project and contract management integration, insufficient project-oriented culture, and lack of a clear role for Headquarters in BICPM. EM then formulated a strategy to meet their objectives in the March 2008 Corporate Implementation Plan. It summarizes BICPM efforts, introduces the vision for BICPM, identifies the strategy for achieving BICPM, and describes a process for implementing BICPM. That is, it acts as a road-map to address EM's challenges. It also documents 18 Recommended Priority Actions (RPAs) that are the key to correcting these challenges. These RPAs provide a clear path forward that can be communicated to the entire EM organization and provide the foundation upon which a BICPM culture can be built. EM has since gained considerable momentum and progress towards institutionalizing BICPM. This paper provides a discussion of the BICPM Initiative and its implementation. (authors)

  18. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  19. Managing Plan Implementation in the Asante Akyem South District ...

    African Journals Online (AJOL)

    Managing Plan Implementation in the Asante Akyem South District Assembly: Capacity Issues and Challenges. ... This paper uses a case study approach to appraise the capacity of the Asante Akyem South District Assembly (AASDA) in ...

  20. Maintenance Management in Network Utilities Framework and Practical Implementation

    CERN Document Server

    Gómez Fernández, Juan F

    2012-01-01

    In order to satisfy the needs of their customers, network utilities require specially developed maintenance management capabilities. Maintenance Management information systems are essential to ensure control, gain knowledge and improve-decision making in companies dealing with network infrastructure, such as distribution of gas, water, electricity and telecommunications. Maintenance Management in Network Utilities studies specified characteristics of maintenance management in this sector to offer a practical approach to defining and implementing  the best management practices and suitable frameworks.   Divided into three major sections, Maintenance Management in Network Utilities defines a series of stages which can be followed to manage maintenance frameworks properly. Different case studies provide detailed descriptions which illustrate the experience in real company situations. An introduction to the concepts is followed by main sections including: • A Literature Review: covering the basic concepts an...

  1. Development and implementation of a business continuity management risk index.

    Science.gov (United States)

    Kadar, Michael

    This paper will present the building blocks for developing and implementing the BCM risk index; whether it is used as a comprehensive metric for risk or preparedness. This paper introduces the concept of a business continuity management (BCM) risk index--a comprehensive metric that measures and reports the status of the primary 'intended outcome' of the BCM programme to top management. In addition to measuring the primary programme output,;the BCM risk index can be used to demonstrate the overall value of the BCM programme to executive management. This is accomplished because the BCM risk index allows quantitative measurement of current risk levels and their comparison with established risk tolerances. The BCM Risk Index can provide executive management with reports on the risk level of individual business units, departments, subsidiaries or the enterprise in a way that drives both risk management and BCM initiatives. The name 'risk index' can be misleading, however. The BCM risk index concept can also be used to measure preparedness levels. In fact, implementation at DTE Energy has resulted in calling it the 'preparedness index', which is used to measure and report preparedness levels rather than risk levels.

  2. U.S. nuclear industry approach to severe accident management guidance, development and implementation

    International Nuclear Information System (INIS)

    Modeen, D.; Walsh, L.; Oehlberg, R.

    1991-01-01

    The purpose of this paper is to discuss the US nuclear industry activities, occurring under the auspices of Nuclear Management and Resources Council (NUMARC), to define, develop and implement enhancements to utility accident management capabilities. This effort consists of three major parts: (1) Development of a practical framework for evaluation of plant-specific accident management capabilities and the subsequent implementation of selected enhancements. (2) Development of specific technical guidance that address arresting core damage if it begins, either in-vessel or ex-vessel, and maintaining containment integrity. Preventing inadequate core cooling or minimizing the consequences of offsite releases, while considered to be candidate areas for accident management enhancements, have been the subject of intense previous study and development. (3) Plant-specific implementation of accident management enhancements in three areas: (a) personnel resources (organization, training, communications); (b) systems and equipment (restoration and repair, instrumentation, use of alternatives); and (c) information resources (procedures and guidance, technical information, process information)

  3. Logistics Cost Calculation of Implementation Warehouse Management System: A Case Study

    Directory of Open Access Journals (Sweden)

    Kučera Tomáš

    2017-01-01

    Full Text Available Warehouse management system can take full advantage of the resources and provide efficient warehousing services. The paper aims to show advantages and disadvantages of the warehouse management system in a chosen enterprise, which is focused on logistics services and transportation. The paper can bring new innovative approach for warehousing and presents how logistics enterprise can reduce logistics costs. This approach includes cost reduction of the establishment, operation and savings in the overall assessment of the implementation of the warehouse management system. The innovative warehouse management system will be demonstrated as the case study, which is classified as a qualitative scientific method, in the chosen logistics enterprise. The paper is based on the research of the world literature, analyses of the internal logistics processes, data and finally enterprise documents. The paper discovers costs related to personnel costs, handling equipment costs and costs for material identification. Implementation of the warehouse management system will reduce overall logistics costs of warehousing and extend the warehouse management system to other parts of the logistics chain.

  4. Risk Management for Enterprise Resource Planning Post Implementation Using COBIT 5 for Risk

    OpenAIRE

    Indah, Dwi Rosa; Harlili, Harlili; Firdaus, Afriyan

    2014-01-01

    Risk management for ERP postimplementation is required to achieve ERP success. In this paper, risk management for ERP postimplementation is designed using COBIT 5 for Risk on APO12 processes. The design of a risk management framework begins with assessment of ERP postimplementation success adopting two approaches, namely the framework of ERP post-implementation success and Critical Success Factor of ERP post-implementation as an input to the risk identification adopted from COBIT 5 for Risk. ...

  5. Implementation of a Shared Resource Financial Management System

    Science.gov (United States)

    Caldwell, T.; Gerlach, R.; Israel, M.; Bobin, S.

    2010-01-01

    CF-6 Norris Cotton Cancer Center (NCCC), an NCI-designated Comprehensive Cancer Center at Dartmouth Medical School, administers 12 Life Sciences Shared Resources. These resources are diverse and offer multiple products and services. Previous methods for tracking resource use, billing, and financial management were time consuming, error prone and lacked appropriate financial management tools. To address these problems, we developed and implemented a web-based application with a built-in authorization system that uses Perl, ModPerl, Apache2, and Oracle as the software infrastructure. The application uses a role-based system to differentiate administrative users with those requesting services and includes many features requested by users and administrators. To begin development, we chose a resource that had an uncomplicated service, a large number of users, and required the use of all of the applications features. The Molecular Biology Core Facility at NCCC fit these requirements and was used as a model for developing and testing the application. After model development, institution wide deployment followed a three-stage process. The first stage was to interview the resource manager and staff to understand day-to-day operations. At the second stage, we generated and tested customized forms defining resource services. During the third stage, we added new resource users and administrators to the system before final deployment. Twelve months after deployment, resource administrators reported that the new system performed well for internal and external billing and tracking resource utilization. Users preferred the application's web-based system for distribution of DNA sequencing and other data. The sample tracking features have enhanced day-to-day resource operations, and an on-line scheduling module for shared instruments has proven a much-needed utility. Principal investigators now are able to restrict user spending to specific accounts and have final approval of the

  6. A Methodology to Implement an Information Security Management System

    Directory of Open Access Journals (Sweden)

    Alaíde Barbosa Martins

    2005-08-01

    Full Text Available Information security has actually been a major challenge to most organizations. Indeed, information security is an ongoing risk management process that covers all of the information that needs to be protected. ISO 17799 offers what companies need in order to better manage information security. The best way to implement this standard is to ease the security management process using a methodology that will define will define guidelines, procedures and tools that will be needed along the way. Hence, this paper proposes a methodology to assist companies in assessing their compliance with BS 7799/ ISO 17799 as well as planning and implementing the actions necessary to become compliant or certified to the standard. The concepts and ideas presented here had been applied in a case study involving the Cetrel S/A - Company of Environmental Protection. For this company, responsible for treatment of industrial residues generated by the Camaçari Petrochemical Complex and adjacent areas, to assure confidentiality and integrity of customers' data is a basic requirement.

  7. Implementation of a records management strategy at the Botswana ...

    African Journals Online (AJOL)

    Implementation of a records management strategy at the Botswana Unified ... raising awareness on the importance of records; human capacity building and ... of records, appreciation of the importance of records as a strategic resource and the ...

  8. The management issues of implementing telecommuting: a case study

    OpenAIRE

    Bane, Chuck Howard, Jr.

    1993-01-01

    Approved for public release; distribution is unlimited. This thesis is a case study of the implementation of telecommuting by CalComp at the Telecommuting Workcenter of Riverside County and is a real life example of the management issues that surround telecommuting. The issues brought forth in this study will enable those responsible for implementing a telecommuting program to better understand the impact of this change on their organization and how a telecommuting center may be used in th...

  9. Aspects of Knowledge Management Programme Implementation into Management System of NPP Operator

    International Nuclear Information System (INIS)

    Sudakov, V.

    2016-01-01

    Full text: The paper deals with the implementation of KM tools and approaches in NPPs of Slovenské elektrárne. The case study emphasizes the importance of KM programme introduction into the existing management system of the company taking into account sustainability and successful of the programme and demonstrates some practical examples. (author

  10. Implementation of a participatory management model: analysis from a political perspective.

    Science.gov (United States)

    Bernardes, Andrea; G Cummings, Greta; Gabriel, Carmen Silvia; Martinez Évora, Yolanda Dora; Gomes Maziero, Vanessa; Coleman-Miller, Glenda

    2015-10-01

    To analyse experiences of managers and nursing staff in the implementation of participatory management, specifically processes of decision-making, communication and power in a Canadian hospital. Implementing a Participatory Management Model involves change because it is focused on the needs of patients and encourages decentralisation of power and shared decisions. The study design is qualitative using observational sessions and content analysis for data analysis. We used Bolman and Deal's four-frame theoretical framework to interpret our findings. Participatory management led to advances in care, because it allowed for more dialogue and shared decision making. However, the biggest challenge has been that all major changes are still being decided centrally by the provincial executive board. Managers and directors are facing difficulties related to this change process, such as the resistance to change by some employees and limited input to decision-making affecting their areas of responsibility; however, they and their teams are working to utilise the values and principles underlying participatory management in their daily work practices. Innovative management models encourage accountability, increased motivation and satisfaction of nursing staff, and improve the quality of care. © 2014 John Wiley & Sons Ltd.

  11. Quality management systems in radiology. Implementation in hospital and radiology practice

    International Nuclear Information System (INIS)

    Teichgraeber, U.; Bucourt, M. de

    2010-01-01

    The concept of quality and the principle of continuous quality improvement are implemented by quality management systems. Quality management systems surpass mere quality control. These systems account for patient and employee needs, the management style and the structure of an enterprise. Many of these quality management systems are used in the health care industry. Some of these systems and their form of application in radiology are introduced here. (orig.)

  12. Implementation Of Quality Management System For Irradiation Processing Services

    Science.gov (United States)

    Lungu, Ion-Bogdan; Manea, Maria-Mihaela

    2015-07-01

    In today's market, due to an increasing competitiveness, quality management has set itself as an indispensable tool and a reference point for every business. It is ultimately focused on customer satisfaction which is a stringent factor for every business. Implementing and maintaining a QMS is a rather difficult, time consuming and expensive process which must be done with respect of many factors. The aim of this paper is to present a case study for implementing QMS ISO 9001 in a gamma irradiation treatment service provider. The research goals are the identification of key benefits, reasons, advantages, disadvantages, drawbacks etc for a successful QMS implementation and use. Finally, the expected results focus on creating a general framework for implementing an efficient QMS plan that can be easily adapted to other kind of services and markets.

  13. Implementation of spatial smart waste management system in malaysia

    Science.gov (United States)

    Omar, M. F.; Termizi, A. A. A.; Zainal, D.; Wahap, N. A.; Ismail, N. M.; Ahmad, N.

    2016-06-01

    One of the challenges to innovate and create an IoT -enabled solution is in monitoring and management of the environment. Waste collection utilizing the Internet of Things (IoT) with the technology of smart wireless sensors will able to gather fill-level data from waste containers hence providing a waste monitoring solution that brings up savings in waste collection costs. One of the challenges to the local authority is how to monitor the works of contractor effective and efficiently in waste management. This paper will propose to the local authority the implementation of smart waste management in Malaysia to improve the city management and to provide better services to the public towards smart city applications.

  14. 76 FR 45198 - Indian Trust Management Reform-Implementation of Statutory Changes

    Science.gov (United States)

    2011-07-28

    ... Parts 4, 30 [Docket ID BIA-2009-0001] RIN 1076-AF07 Indian Trust Management Reform--Implementation of Statutory Changes AGENCY: Bureau of Indian Affairs, Office of the Secretary, Interior. ACTION: Final rule... February 10, 2011, to implement the latest statutory changes to the Indian Land Consolidation Act, as...

  15. Considerations on Risk in Supply Chain Management Information Systems Implementation

    Directory of Open Access Journals (Sweden)

    Valentin-Petru Măzăreanu

    2013-02-01

    Full Text Available Innovation in information and communication technologies resulted in the digital revolution. This kind of revolution is changing the way people work, learn, communicate and manage their businesses. Due to the need to achieve the competitive advantage and to meet the business requirements, we are witnessing an increasing shift from business to e-business and mobile business. In this kind of world solutions like Supply Chain Management (SCM are increasingly appearing. The business success depends on how effective the information system works. Any interruption of the information system will inevitably lead to business loss. To ensure the successful implementation of a SCM project it is necessary to study even from the early stages which are the possible actions / risks / obstacles which might damage in one way or another the execution of the project. The role of the literature and case studies review in the field of interest is undeniable because it provides us with access to the so-called lessons-learned. By using this approach, in this paper, we present the most common risks and risk sources encountered in the implementation projects of SCM type information systems. We also propose a risk identification framework that can be used in the early stages of the implementation project of a Supply Chain Management information system.

  16. Improving the implementation of responsible alcohol management practices by community sporting clubs: A randomised controlled trial.

    Science.gov (United States)

    Kingsland, Melanie; Wolfenden, Luke; Tindall, Jennifer; Rowland, Bosco; Sidey, Maree; McElduff, Patrick; Wiggers, John H

    2015-07-01

    Despite an increased prevalence of risky alcohol consumption and alcohol-related harm among members of sporting groups and at sporting venues, sporting clubs frequently fail to implement alcohol management practices consistent with liquor legislation and best practice guidelines. The aim of this study was to assess the impact of a multi-strategy intervention in improving the implementation of responsible alcohol management practices by sports clubs. A randomised controlled trial was conducted with 87 football clubs, with half randomised to receive a multi-strategy intervention to support clubs to implement responsible alcohol management practices. The 2-year intervention, which was based on implementation and capacity building theory and frameworks, included project officer support, funding, accreditation rewards, printed resources, observational audit feedback, newsletters, training and support from state sporting organisations. Interviews were undertaken with club presidents at baseline and post-intervention to assess alcohol management practice implementation. Post-intervention, 88% of intervention clubs reported implementing '13 or more' of 16 responsible alcohol management practices, which was significantly greater than the proportion of control groups reporting this level of implementation (65%) [odds ratio: 3.7 (95% confidence interval: 1.1-13.2); P = 0.04]. All intervention components were considered highly useful and three-quarters or more of clubs rated the amount of implementation support to be sufficient. The multi-strategy intervention was successful in improving alcohol management practices in community sports clubs. Further research is required to better understand implementation barriers and to assess the long-term sustainability of the change in club alcohol management practices. © 2015 Australasian Professional Society on Alcohol and other Drugs.

  17. Effects of performance measure implementation on clinical manager and provider motivation.

    Science.gov (United States)

    Damschroder, Laura J; Robinson, Claire H; Francis, Joseph; Bentley, Douglas R; Krein, Sarah L; Rosland, Ann-Marie; Hofer, Timothy P; Kerr, Eve A

    2014-12-01

    Clinical performance measurement has been a key element of efforts to transform the Veterans Health Administration (VHA). However, there are a number of signs that current performance measurement systems used within and outside the VHA may be reaching the point of maximum benefit to care and in some settings, may be resulting in negative consequences to care, including overtreatment and diminished attention to patient needs and preferences. Our research group has been involved in a long-standing partnership with the office responsible for clinical performance measurement in the VHA to understand and develop potential strategies to mitigate the unintended consequences of measurement. Our aim was to understand how the implementation of diabetes performance measures (PMs) influences management actions and day-to-day clinical practice. This is a mixed methods study design based on quantitative administrative data to select study facilities and quantitative data from semi-structured interviews. Sixty-two network-level and facility-level executives, managers, front-line providers and staff participated in the study. Qualitative content analyses were guided by a team-based consensus approach using verbatim interview transcripts. A published interpretive motivation theory framework is used to describe potential contributions of local implementation strategies to unintended consequences of PMs. Implementation strategies used by management affect providers' response to PMs, which in turn potentially undermines provision of high-quality patient-centered care. These include: 1) feedback reports to providers that are dissociated from a realistic capability to address performance gaps; 2) evaluative criteria set by managers that are at odds with patient-centered care; and 3) pressure created by managers' narrow focus on gaps in PMs that is viewed as more punitive than motivating. Next steps include working with VHA leaders to develop and test implementation approaches to help

  18. Critical factors in the implementation process of integrated management systems

    Directory of Open Access Journals (Sweden)

    Ademir Antonio Ferreira

    2015-09-01

    Full Text Available This study is the result of research whose purpose was to study the implementation process of integrated management systems, called ERP Enterprise Resource Planning in the business environment. This study, more specifically, tried to identify the variables in this process and that, somehow, made it easy or caused some type of difficulty implementing the system. Based on the mixed method approach (Creswell, 2003, the study was performed by means of the content analysis of technical and scientific publications about this theme and by means of a field research for data collection from primary sources. The content analysis was based on the per mile procedure by Bardin (1977, making it possible to identify critical factors that may be found in the implementation of ERP system projects. Primary data was collected from structured interviews with the managers in charge of the implementation of the system, in each of the 12 companies in different sectors of the economy and based in Brazil. Based on this information, it was possible to test the factors extracted from the content analysis and then develop a list of factors that may effectively influence the implementation process of the system. In order to recognize the possible relations between the selected factors, the Spearman (rsp correlation coefficient was applied and the multiple regression analysis was performed by means of the stepwise procedure. The purpose of the regression analysis was to determine the relation of the “Assessment of the Implementation” dependent variable with other dependent variables in the selected categories. The results of these analyses showed that the support of the top management, the communication process for the clear evidence of this support, the technical support of the ERP program provider together with the project team expertise, training and qualification processes of the team in the system operation are significantly correlated and relevant factors for a

  19. Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casella, Amanda J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pereira, Mario M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Steen, Franciska H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-01-01

    This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

  20. Project-Management Tools for Libraries: A Planning and Implementation Model Using Microsoft Project 2000

    OpenAIRE

    Ying Zhang; Corinne Bishop

    2005-01-01

    This paper discusses how Microsoft Project 2000 was utilized at the University of Central Florida Libraries to manage an e-reference implementation project. As libraries today adopt more information technologies, efficiently managing projects can be challenging. The authors’ experience in the implementation of QuestionPoint e-reference software in October 2003 is described. Their conclusion illustrates that project-management tools, such as Microsoft Project 2000, offer practical workflow-man...

  1. Criteria for evaluating the design of implementation models for integrated coastal management

    CSIR Research Space (South Africa)

    Taljaard, Susan

    2011-09-01

    Full Text Available Despite the emphasis placed on the contextual nature of integrated coastal management (ICM) implementation in the literature, many uniformities are encountered in ICM implementation worldwide. In this article the tangled threads of ICM practice...

  2. Implementation Of ISO 9000 Quality Management System Within The Manufacturing And Service Industry Of Ivory Coast

    Directory of Open Access Journals (Sweden)

    Borget Alfred Anoye

    2015-08-01

    Full Text Available Abstract The objective of this paper was to present the factors that impede the implementation of ISO 9000 QMS within the manufacturing and service Industry of Ivory Coast. It wasnt the intention of the author to provide detailed strategies for the readers to implement ISO 9000. It was an effort to present the relationship if any between the lack of ISO 9000 adoption and the perception of Ivoirians business organization leaders. For that purpose five research questions were associated with this study. The population for this study was all non-ISO certified business organizations in both public and private sector and was physically located in Ivory Coast. The population sample for this study was the 5044 members of the Chambre de Commerce et dIndustrie de Cote dIvoire CCI from which the author utilized the sample size of 60 business organizations randomly selected. This study utilized a survey questionnaire of face to face interview as data collection method. The survey questionnaire contained thirty three 33 questions organized in six parts and was proposed to 60 business organizations leaders. The result showed that business organization leaders in Ivory Coast were aware of the ISO 900 QMS but do not have enough knowledge on the ISO 9000 QMS implementation and certification. This could be due to the poor job done by CODIMORM the local national bureau of standards as a source of information. However it was found that business organization leaders in Ivory Coast intended to pursue and obtain ISO 9000 QMS certification. With respect to perceived benefits they indicated customer satisfaction improvement as the most important benefit that ISO 9000 QMS certification could bring to their general management activities. With respect to perceived improvements they selected quality of productsservices as the most important improvement that ISO 9000 QMS implementation and certification could help to achieve. Overall business organization leaders in Ivory

  3. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental...-Solano Air Quality Management District portion of the California State Implementation Plan (SIP). This... the following local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable...

  4. The method of Sample Management in Neutron Activation Analysis Laboratory-Serpong

    International Nuclear Information System (INIS)

    Elisabeth-Ratnawati

    2005-01-01

    In the testing laboratory used by neutron activation analysis method, sample preparation is the main factor and it can't be neglect. The error in the sample preparation can give result with lower accuracy. In this article is explained the scheme of sample preparation i.e sample receive administration, the separate of sample, fluid and solid sample preparation, sample grouping, irradiation, sample counting and holding the sample post irradiation. If the management of samples were good application based on Standard Operation Procedure, therefore each samples has good traceability. To optimize the management of samples is needed the trained and skilled personal and good facility. (author)

  5. Implementation of Software Configuration Management Process by Models: Practical Experiments and Learned Lessons

    Directory of Open Access Journals (Sweden)

    Bartusevics Arturs

    2014-12-01

    Full Text Available Nowadays software configuration management process is not only dilemma which system should be used for version control or how to merge changes from one source code branch to other. There are multiple tasks such as version control, build management, deploy management, status accounting, bug tracking and many others that should be solved to support full configuration management process according to most popular quality standards. The main scope of the mentioned process is to include only valid and tested software items to final version of product and prepare a new version as soon as possible. To implement different tasks of software configuration management process, a set of different tools, scripts and utilities should be used. The current paper provides a new model-based approach to implementation of configuration management. Using different models, a new approach helps to organize existing solutions and develop new ones by a parameterized way, thus increasing reuse of solutions. The study provides a general description of new model-based conception and definitions of all models needed to implement a new approach. The second part of the paper contains an overview of criteria, practical experiments and lessons learned from using new models in software configuration management. Finally, further works are defined based on results of practical experiments and lessons learned.

  6. APPROACHES TO IMPLEMENTATION OF AN INTEGRATED MANAGEMENT SYSTEM IN THE PHARMACEUTICAL INDUSTRY. GALENICAL PHARMACEUTICAL PRODUCTION

    Directory of Open Access Journals (Sweden)

    Ershova Elena Vladimirovna

    2015-10-01

    Full Text Available This article reviews the issues associated with development of an integrated quality management system and its implementation into a galenical pharmaceutical company. Recently, the Russian pharmaceutical industry has been developing extensively: pharmaceutical clusters are being formed, new and innovative technologies are being developed. For the enterprises producing galenical pharmaceutical products, which feature low prices and a high level of competition, development and implementation of management systems is a way to prove their competitiveness. The purpose of this article is to review the architecture and the key elements of integrated management systems for pharmaceutical enterprises, develop an integrated management system in terms of the upcoming revision of ISO 9001:2015, as well as to describe the benefits of implementation of such systems. The presented approach is the result of an educational project implemented within the framework of the MBA programme in "Master of Business Administration (MBA" in the Federal State Budgetary Educational Institution of Continuing Professional Education Pastukhov State Academy of Industrial Management.

  7. Disability management in a sample of Australian self-insured companies.

    Science.gov (United States)

    Westmorland, M; Buys, N; Clements, N

    2002-09-20

    Disability management (DM) is a term developed in North America and refers to the prevention and management of injury and illness in the workplace. The purpose of this paper is to report findings of an Australian study that examined whether self-insured employers in that country have implemented integrated DM programmes. Key principles underpinning such programmes are explored to identify the extent to which Australian employers have adopted them. Data was collected from 29 self-insured Australian companies in three Australian States using a structured interview format with additional open-ended questions. It was found that companies have in place, to varying degrees, some of the key elements of disability management programmes. However, these elements were often not well integrated in a comprehensive disability management approach. The focus on workplace-based, early intervention in the area of return to work for injured employees was particularly strong, but there was little evidence of formal labour-management committee structures responsible for implementing DM programmes. If the concept of DM is relevant to the Australian environment then this study would suggest that self-insured companies need to undertake further work to develop integrated approaches to preventing and managing disability in the workplace. Several limitations of this study are highlighted and it is concluded that further work in this area is needed.

  8. Barriers to implementation of risk management for federal wildland fire management agencies in the United States

    Science.gov (United States)

    Dave Calkin; Matthew P. Thompson; Alan A. Ager; Mark Finney

    2010-01-01

    In this presentation we review progress towards the implementation of a risk-based management framework for U.S. Federal wildland fire policy and operations. We first describe new developments in wildfire simulation technology that catalyzed the development of risk-based decision support systems for strategic wildfire management. These systems include new analytical...

  9. A Decade of Experience in Implementing Quality Management System at Radiochemistry and Environmental Laboratory (RAS)

    International Nuclear Information System (INIS)

    Norfaizal Mohamed; Nita Salina Abu Bakar; Zal U'yun Wan Mahmood; Wo, Y.M.; Abdul Kadir Ishak; Nurrul Assyikeen Md Jaffary; Noor Fadzilah Yusof

    2016-01-01

    Quality management system has been introduced to a few laboratories in the Malaysian Nuclear Agency (Nuclear Malaysia) for the purpose to enhance the delivery of quality services to customers. Radiochemistry and Environmental Laboratory (RAS) is a service center in Nuclear Malaysia has implemented a quality management system in procedures carried out and has obtained accreditation for MS ISO/ IEC 17025 since 8 December 2005. This paper is intended to share experiences RAS in implementing a quality management system in accordance with standard MS ISO/ IEC 17025 accreditation and managed to keep it to this day. In addition, the RAS achievements including issues and challenges in implementing the quality management system in the past 10 years will also be discussed. (author)

  10. The influence of knowledge management implementation toward the quality of high schools

    Directory of Open Access Journals (Sweden)

    Hilda Ainissyifa

    2012-09-01

    Full Text Available The purpose of this study is to analyze the influence of knowledge management implementation toward the quality of high schools. This study was conducted among five high schools under an education foundation. The analysis models used in the study were correlation analysis and t-test. The respondents were used as the profession references are 86 teachers. The result of the study shows that knowledge management implementation has a positive and significant influence toward the quality of high schools.

  11. Implementing the Environmental Management System ISO 14001 at the Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Jelev, Adrian

    2003-01-01

    An environmental management plan (EMP) has been developed for the Cernavoda NPP Unit 1. It contains the necessary components for identification and management of the environmental aspects of NPP. The environmental policy of the 'Nuclearelectrica' National Society and the associated EMP are the basis for the Environment Management System that will be implemented at Cernavoda NPP. The final step of this process will be the ISO 14001 certification. This paper points out to the main aspects concerning the implementation of the ISO 14001 system at Cernavoda NPP Unit 1. (author)

  12. Implementation of a records management strategy at the Botswana ...

    African Journals Online (AJOL)

    Ngulup

    University of Botswana, Department of Library and Information Studies, ... implementation of records and document management systems. .... The BURS Act further states that BURS has to maintain adequate accounting records ... organisation puts in place internal financial controls that would maintain a strong control.

  13. Implementation of the safety culture for HANARO safety management

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Jongsup; Han, Geeyang; Kim, Iksoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2008-11-15

    Safety is the fundamental principal upon which a management system is based. The IAEA INSAG (International Nuclear Safety Group) states the general aims of a safety management system. One of which is to foster and support a strong safety culture through the development and reinforcement of good safety attitudes and behavior in individuals and teams, so as to allow them to carry out their tasks safely. The safety culture activities have been implemented and the importance of a safety management in nuclear activities for a reactor application and utilization has also been emphasized for more than 10 years in HANARO which is a 30MW multi-purpose research reactor that achieved its first criticality in February 1995. The safety culture activities and implementations have been conducted continuously to enhance its safe operation such as the seminars and lectures related to safety matters, participation in international workshops and the development of safety culture indicators, a survey on the attitude of HANARO staff toward the safety culture, the development of operational safety performance indicators (SPIs), the preparation of a safety text book and the development of a e-learning program for a safety education purpose.

  14. Implementation of the safety culture for HANARO safety management

    International Nuclear Information System (INIS)

    Wu, Jongsup; Han, Geeyang; Kim, Iksoo

    2008-01-01

    Safety is the fundamental principal upon which a management system is based. The IAEA INSAG (International Nuclear Safety Group) states the general aims of a safety management system. One of which is to foster and support a strong safety culture through the development and reinforcement of good safety attitudes and behavior in individuals and teams, so as to allow them to carry out their tasks safely. The safety culture activities have been implemented and the importance of a safety management in nuclear activities for a reactor application and utilization has also been emphasized for more than 10 years in HANARO which is a 30MW multi-purpose research reactor that achieved its first criticality in February 1995. The safety culture activities and implementations have been conducted continuously to enhance its safe operation such as the seminars and lectures related to safety matters, participation in international workshops and the development of safety culture indicators, a survey on the attitude of HANARO staff toward the safety culture, the development of operational safety performance indicators (SPIs), the preparation of a safety text book and the development of a e-learning program for a safety education purpose

  15. Implementation of the safety culture for HANARO Safety Management

    International Nuclear Information System (INIS)

    Wu, Jongsup; Han, Geeyang; Kim, Iksoo

    2008-01-01

    Safety is the fundamental principal upon which the management system is based. The IAEA INSAG(International Nuclear Safety Group) states the general aims of the safety management system. One of which is to foster and support a strong safety culture through the development and reinforcement of good safety attitudes and behavior in individuals and teams so as to allow them to carry out their tasks safety. The safety culture activities have been implemented and the importance of safety management in nuclear activities for a reactor application and utilization has also been emphasized more than 10 years in HANARO which is a 30 MW multi-purpose research reactor and achieved its first criticality in February 1995. The safety culture activities and implementations have been conducted continuously to enhance its safe operation like the seminars and lectures related to safety matters, participation in international workshops, the development of safety culture indicators, the survey on the attitude of safety culture, the development of operational safety performance indicators (SPIs), the preparation of a safety text book and the development of an e-Learning program for safety education. (author)

  16. Disseminating contingency management: impacts of staff training and implementation at an opiate treatment program.

    Science.gov (United States)

    Hartzler, Bryan; Jackson, T Ron; Jones, Brinn E; Beadnell, Blair; Calsyn, Donald A

    2014-04-01

    Guided by a comprehensive implementation model, this study examined training/implementation processes for a tailored contingency management (CM) intervention instituted at a Clinical Trials Network-affiliate opioid treatment program (OTP). Staff-level training outcomes (intervention delivery skill, knowledge, and adoption readiness) were assessed before and after a 16-hour training, and again following a 90-day trial implementation period. Management-level implementation outcomes (intervention cost, feasibility, and sustainability) were assessed at study conclusion in a qualitative interview with OTP management. Intervention effectiveness was also assessed via independent chart review of trial CM implementation vs. a historical control period. Results included: 1) robust, durable increases in delivery skill, knowledge, and adoption readiness among trained staff; 2) positive managerial perspectives of intervention cost, feasibility, and sustainability; and 3) significant clinical impacts on targeted patient indices. Collective results offer support for the study's collaborative intervention design and the applied, skills-based focus of staff training processes. Implications for CM dissemination are discussed. Published by Elsevier Inc.

  17. What Hinders the Implementation of the Supply Chain Risk Management Process Into Practice Organizations?

    DEFF Research Database (Denmark)

    Gredal, Pauline; Panyi, Zsófia; Kinra, Aseem

    2017-01-01

    Supply chain risk management process (SCRMP) is being advanced as a systematic and structured approach for identifying, assessing, mitigating, and monitoring all risks arising from complex supply chains. However, while the literature deems it necessary to implement such a process as the solution ...... indicate that the unavailability of information and lack of proper data management hinders the implementation of SCRMP in the context global supply chains.......Supply chain risk management process (SCRMP) is being advanced as a systematic and structured approach for identifying, assessing, mitigating, and monitoring all risks arising from complex supply chains. However, while the literature deems it necessary to implement such a process as the solution...... to the increasing vulnerability companies face, there is a lack of empirical evidence on whether the process model can be implemented. This paper shows possible hindrances in the implementation of SCRMP for companies with global supply chains based on the findings of an in-depth case study. Our empirical findings...

  18. 76 FR 55581 - Revision to the California State Implementation Plan; Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... California State Implementation Plan; Yolo-Solano Air Quality Management District AGENCY: Environmental... revision to the Yolo-Solano Air Quality Management District portion of the California State Implementation...-Solano Air Quality Management District (YSAQMD) Rule 2.41, adopted on September 10, 2008, and submitted...

  19. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... the California State Implementation Plan; South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the...

  20. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-22

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  1. Risk Management in the Implementation of Smart Building Projects

    Directory of Open Access Journals (Sweden)

    Kankhva Vadim

    2017-01-01

    Full Text Available This article contains the results of a study of the risk control structure in the implementation of smart building projects, which are presented herein in the form of an operational risk management mechanism developed by the author and an improved definition of the risk management system. The mechanism is developed based on the analysis of a review of the current state of the construction sector and the existing organizational structures of construction companies, as well as based on the identification of new necessary functions and objectives of risk management systems. The results of the study can be used in the process of development and integration of risk management systems by the existing construction companies specialized in the construction of smart buildings.

  2. Model for defining the level of implementation of the management functions in small enterprises

    Directory of Open Access Journals (Sweden)

    Dragan Mišetić

    2001-01-01

    Full Text Available Small enterprises, based on private ownership and entrepreneurial capability, represent, for the majority of the scientific and professional public, the prime movers of economic growth, both in developed market economies and in the economies of countries in transition. At the same time, various studies show that the main reason for the bankruptcy of many small enterprises (more than 90% can be found in weak management, i.e. unacquaintance with management functions (planning, organization, human resources management, leading and control and with the need of implementing those functions in practice. Although it is not easy to define the ingredients of the recipe for success or to define precisely the importance of different elements, and regardless of the fact that many authors think that the management theory for large enterprises is inapplicable for the small ones, we all agree that the owner/manager and his implementation of the management theory has a decisive influence on small enterprises in modern economic circumstances. Therefore, the author of this work is hereby representing the model, which defines the level of implementation of management functions in small enterprises, as well as three systems/levels (danger, risk, progress in which small enterprises may find themselves. After the level of implementation of the management function is identified, it is possible to undertake some corrective actions, which will remove the found failures. While choosing the variables of the model, the author took into consideration specific features of a small enterprise, as well as specific features of its owner/manager.

  3. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... California State Implementation Plan; South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District portion of the California State Implementation... Submittal A. What rule did the State submit? We are approving South Coast Air Quality Management District...

  4. The Implementation of Enrollment Management at Two Public Universities Experiencing Demographic and Funding Challenges

    Science.gov (United States)

    Lee, Stephen

    2010-01-01

    The purpose of this study was to evaluate the implementation of enrollment management at two public universities. The theoretical framework was conceptual and centered on the effectiveness of the implementation process as a pivotal factor in the development of a comprehensive enrollment management operation. This multi-site case study included 14…

  5. Practice change in community pharmacy: using change-management principles when implementing a pharmacy asthma management service in NSW, Australia.

    Science.gov (United States)

    Feletto, Eleonora; Lui, Grace Wan Ying; Armour, Carol; Saini, Bandana

    2013-02-01

    This study aimed to investigate the application of a research-based change-management tool, the Pharmacy Change Readiness Wheel (PCRW), in practice, and the impact it had on the implementation of an asthma service (Pharmacy Asthma Management Service or PAMS). All pharmacists implementing the PAMS in the state of New South Wales, Australia, were provided training using a custom-designed module explaining change readiness as it applied to the PAMS. This training and a self-administered PCRW checklist were completed before PAMS implementation. Following PAMS service delivery, semi-structured phone interviews were conducted with the pharmacists and any additional staff involved regarding their experiences of change management. Interviews were transcribed verbatim and content analysed. Thirty seven of the forty five pharmacies who delivered PAMS returned the PCRW checklist (82% response rate) and participants from 29 pharmacies were interviewed (29 pharmacists and six additional staff). Perception of readiness for change before service delivery was remarkably high. From the interviews conducted after service delivery it was evident that systematic management of the practice change using theoretical concepts had not really been undertaken and that many challenges were faced in the implementation of practice change (PAMS). The results of the content analysis from the interviews revealed that factors external or internal to the pharmacy or those related to the individual pharmacist could affect implementation of practice change. Change is not as straightforward as it may appear and is a multi-step process over time. Pharmacists were unaware of this. A change-management framework should be applied to specific services with enough flexibility so that pharmacists can individualise them for their pharmacies. © 2012 The Authors. IJPP © 2012 Royal Pharmaceutical Society.

  6. Implementing adaptive phased management (APM) for Canada's used nuclear fuel

    International Nuclear Information System (INIS)

    King, F.

    2008-01-01

    This paper discusses the implementation of Adaptive Phased Management (APM) for Canada's used nuclear fuel. APM is a combination of technology and management system. The technology involves centralized containment and isolation in deep geological repository in a suitable rock formation, as well as shallow storage where used fuel remains retrievable. In both cases there is continuous monitoring. The management system consists of public engagement, phased decision-making, continuous learning and adaption, open and inclusive. Finally, it involves seeking an in formed willing host community

  7. Implementing of Quality management system (ISO 9000) in Radiotherapic Oncologycal Service

    International Nuclear Information System (INIS)

    Quarneti, A.; Castaño, A.; De Rosa, A.; Pintado, D.; Luongo Gardi, A.; Dalla Rosa, M.; Guerrero, L.; Luongo, M.; Luongo Céspedes, A.; Marchese, E.; Torres, M.; Di Mauro, J.; Payse, M.; Lorenzo, M.; Cortés, A.; Battagliotti, R.; Satragno, N.; García, I.; Gonsalves, D.; Gonzalez, J.; Ricagni, L.; Benausse, M.; Dama Volunt; Ferreiro, M.

    2004-01-01

    Objective: To show the progress and difficulties in the process of implementing a quality management system(QMS) according to the technical standard UNIT-ISO 9001-2000. Material and methods: The system is being implemented in Oncology Radiation of Dpt. Of Clinical Oncology, Hospital de Clínicas, Montevideo, and certification thereof shall be made by the Uruguayan Institute of Technical Standards (UNIT). The working group consists of: medical teachers, post-graduate, radiotherapy technicians,physical assistant, nurse, secretary, general service and pink ladies,besides teachers and interns UNIT. A systems approach to quality management in stages is applied and focused on the 8 quality principles: The commitment of senior management who drafted the quality policy was established. A committee and a coordinator of quality, service three doctors appointed are concurring specialist courses in quality management in health institutions dictated by UNIT. Patient surveys, officers and staff awareness talks were conducted. It is developing the mission, vision, objectives of quality and Quality Manual. Key processes, support and work procedures were determined. Presented some obstacles, mainly resistance to change. Conclusions: The implementation of a QMS is a valuable tool that tends to continuous quality improvement, increase patient satisfaction and service members, the performance of the organization and its processes, but is difficult due to instrumentation resistance to the changes observed in our service

  8. 76 FR 76609 - Implementation of Office of Management and Budget Guidance on Drug-Free Workplace Requirements

    Science.gov (United States)

    2011-12-08

    ... Implementation of Office of Management and Budget Guidance on Drug-Free Workplace Requirements AGENCY: Office of... Management and Budget (OMB) guidance implementing the portion of the Drug-Free Workplace Act of 1988 (41 U.S... removing its regulation implementing the Governmentwide common rule on drug-free workplace requirements for...

  9. The Quality Improvement Management Approach as Implemented in a Middle School.

    Science.gov (United States)

    Bayless, David L.; And Others

    1992-01-01

    The Total Quality Management Theory of W. E. Deming can be adapted within an educational organization to build structures that support educators' beliefs. A case study of the implementation of Deming principles at the LeRoy Martin Middle School in Raleigh (North Carolina) illustrates the effectiveness of this management approach. (SLD)

  10. Quality Management Principles and Benefits of their Implementation in Central Banks

    OpenAIRE

    Radoica Luburić

    2015-01-01

    This article discusses the principles of quality management and benefits of their implementation in central banks. It is based on new principles of quality management, in particular to: customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, and, relationship management. With a view to continuously improving their performance and achieving sustained success, central banks have a realistic opportunity to use these principles in an effici...

  11. An overview of Quality Management System implementation in a research laboratory

    Science.gov (United States)

    Molinéro-Demilly, Valérie; Charki, Abdérafi; Jeoffrion, Christine; Lyonnet, Barbara; O'Brien, Steve; Martin, Luc

    2018-02-01

    The aim of this paper is to show the advantages of implementing a Quality Management System (QMS) in a research laboratory in order to improve the management of risks specific to research programmes and to increase the reliability of results. This paper also presents experience gained from feedback following the implementation of the Quality process in a research laboratory at INRA, the French National Institute for Agronomic Research and details the various challenges encountered and solutions proposed to help achieve smoother adoption of a QMS process. The 7Ms (Management, Measurement, Manpower, Methods, Materials, Machinery, Mother-nature) methodology based on the Ishikawa `Fishbone' diagram is used to show the effectiveness of the actions considered by a QMS, which involve both the organization and the activities of the laboratory. Practical examples illustrate the benefits and improvements observed in the laboratory.

  12. Process-driven information management system at a biotech company: concept and implementation.

    Science.gov (United States)

    Gobbi, Alberto; Funeriu, Sandra; Ioannou, John; Wang, Jinyi; Lee, Man-Ling; Palmer, Chris; Bamford, Bob; Hewitt, Robin

    2004-01-01

    While established pharmaceutical companies have chemical information systems in place to manage their compounds and the associated data, new startup companies need to implement these systems from scratch. Decisions made early in the design phase usually have long lasting effects on the expandability, maintenance effort, and costs associated with the information management system. Careful analysis of work and data flows, both inter- and intradepartmental, and identification of existing dependencies between activities are important. This knowledge is required to implement an information management system, which enables the research community to work efficiently by avoiding redundant registration and processing of data and by timely provision of the data whenever needed. This paper first presents the workflows existing at Anadys, then ARISE, the research information management system developed in-house at Anadys. ARISE was designed to support the preclinical drug discovery process and covers compound registration, analytical quality control, inventory management, high-throughput screening, lower throughput screening, and data reporting.

  13. Toward A Methodology For Managing Information Systems Implementation: A Social Constructivist Perspective

    Directory of Open Access Journals (Sweden)

    Suprateek Sarker

    2000-01-01

    Full Text Available This paper argues that our approach to managing the implementation of information technologies is often dependent on how we frame the implementation problem. The paper first traces the dominant ways of framing the implementation problem that are evident in the literature, and through this historical analysis, identifies the Leavitt's diamond for representing organizations as the integrative conceptual model underlying much of the current implementation literature. Next, by drawing on the notions of objective and subjective realities from the arena of sociology of knowledge, the paper further develops the diamond model and uses it as a frame for informing the implementation of code-generators in a hypothetical organization. The richer understanding enabled by the enhanced diamond model proposed in the paper leads to the formulation of some broad guidelines for managing the implementation of "interpretively flexible" information technologies. These guidelines are summarized in four steps: 1 self-understanding through self-reflection, 2 identification and understanding of all important stakeholder groups, 3 identification of stakeholders who are likely to resist, and 4 judiciously combining the two approaches outlines in steps 2 and 3.

  14. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  15. A Situational Implementation Method for Business Process Management Systems

    NARCIS (Netherlands)

    R.L. Jansen; J.P.P. Ravensteyn

    For the integrated implementation of Business Process Management and supporting information systems many methods are available. Most of these methods, however, apply a one-size fits all approach and do not take into account the specific situation of the organization in which an information system is

  16. Implementation of the Integrated Management of Childhood Illnesses strategy: challenges and recommendations in Botswana.

    Science.gov (United States)

    Mupara, Lucia U; Lubbe, Johanna C

    2016-01-01

    Under-five mortality has been a major public health challenge from time immemorial. In response to this challenge, the World Health Organization and the United Nations Children's Fund developed the Integrated Management of Childhood Illnesses (IMCI) strategy and presented it to the whole world as a key approach to reduce child morbidity and mortality. Botswana started to implement the IMCI strategy in 1998. Reductions in the under-five mortality rate (U5MR) have been documented, although the reduction is not on par with the expected Millennium Development Goal 4 predictions. A quantitative study was done to identify the problems IMCI implementers face when tending children under 5 years in the Gaborone Health District of Botswana. The study population was made up of all the IMCI-trained and registered nurses, and systematic sampling was used to randomly select study participants. Questionnaires were used to collect data. The study findings indicated challenges related to low training coverage, health systems, and the unique features of the IMCI strategy. The comprehensive implementation of the IMCI strategy has the potential to significantly influence the U5MR in Botswana.

  17. Implementation of the Integrated Management of Childhood Illnesses strategy: challenges and recommendations in Botswana

    Directory of Open Access Journals (Sweden)

    Lucia U. Mupara

    2016-02-01

    Full Text Available Background: Under-five mortality has been a major public health challenge from time immemorial. In response to this challenge, the World Health Organization and the United Nations Children's Fund developed the Integrated Management of Childhood Illnesses (IMCI strategy and presented it to the whole world as a key approach to reduce child morbidity and mortality. Botswana started to implement the IMCI strategy in 1998. Reductions in the under-five mortality rate (U5MR have been documented, although the reduction is not on par with the expected Millennium Development Goal 4 predictions. Design: A quantitative study was done to identify the problems IMCI implementers face when tending children under 5 years in the Gaborone Health District of Botswana. The study population was made up of all the IMCI-trained and registered nurses, and systematic sampling was used to randomly select study participants. Questionnaires were used to collect data. Results: The study findings indicated challenges related to low training coverage, health systems, and the unique features of the IMCI strategy. Conclusions: The comprehensive implementation of the IMCI strategy has the potential to significantly influence the U5MR in Botswana.

  18. Implementation of a management system in accordance with IAEA GS-R-3 Standard. A gap analysis

    International Nuclear Information System (INIS)

    Dicianu, I.; Oprea, M.

    2009-01-01

    Full text: The design and implementation of an Integrated Management System at SNN SA Headquarters become necessary as the CNCAN norms are already under revision to comply with the IAEA GS-R-3 standard. The purpose of this analysis is to draft a project for the transition from a Quality Management System (QMS) to an Integrated Management System (IMS) complying with GS-R-3 requirements. Four steps were identified for developing this project: STEP1 - To justify the necessity of the IMS implementation to meet the SNN SA Headquarters Top Management commitments. The requirements for implementing an IMS are analyzed and a comprehensive document is issued to (and maybe discussed with) SNN General Director in order to obtain the top management adherence/commitment to the project implementation. The document will show the strong and the weak points which should be considered in developing the project. The references for the project are: - IAEA Safety Standard GS-R-3 'The Management System for Facilities and Activities'; - ISO - 1400/2004 Standard 'Environmental Management System Requirements'; - OHSAS 18001/2007 Standard 'Occupational Health and Safety Management Systems. Requirements'; There are also considered: - IAEA Safety Guide GS-G-3.1 'Application of the Management System for Facilities and Activities'; - IAEA Draft Safety Guide DS-349 'Application of the Management System for Nuclear Facilities; There will be considered: Workshop 2 Bookmarks (F5) 2 - CNCAN Norms (as they will be revised); STEP2 - The performance of a comparative analysis of the requirements of GS-R-3, ISO 14001 and OHSAS 18001 versus the provisions of the QMS already implemented in SNN. This analysis is shown as a comparative table; STEP3 - Identification of the IMS processes. An overall analysis of the current processes described in the SNN QMS Manual is performed and based on this. There are identified the additional processes that have to be documented for the proper implementation of an IMS

  19. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  20. Implementation of safety management systems in Hong Kong construction industry - A safety practitioner's perspective.

    Science.gov (United States)

    Yiu, Nicole S N; Sze, N N; Chan, Daniel W M

    2018-02-01

    In the 1980s, the safety management system (SMS) was introduced in the construction industry to mitigate against workplaces hazards, reduce the risk of injuries, and minimize property damage. Also, the Factories and Industrial Undertakings (Safety Management) Regulation was introduced on 24 November 1999 in Hong Kong to empower the mandatory implementation of a SMS in certain industries including building construction. Therefore, it is essential to evaluate the effectiveness of the SMS in improving construction safety and identify the factors that influence its implementation in Hong Kong. A review of the current state-of-the-practice helped to establish the critical success factors (CSFs), benefits, and difficulties of implementing the SMS in the construction industry, while structured interviews were used to establish the key factors of the SMS implementation. Results of the state-of-the-practice review and structured interviews indicated that visible senior commitment, in terms of manpower and cost allocation, and competency of safety manager as key drivers for the SMS implementation. More so, reduced accident rates and accident costs, improved organization framework, and increased safety audit ratings were identified as core benefits of implementing the SMS. Meanwhile, factors such as insufficient resources, tight working schedule, and high labor turnover rate were the key challenges to the effective SMS implementation in Hong Kong. The findings of the study were consistent and indicative of the future development of safety management practice and the sustainable safety improvement of Hong Kong construction industry in the long run. Copyright © 2018 National Safety Council and Elsevier Ltd. All rights reserved.

  1. Implementation of transportation asset management in Grandview, Missouri : final report.

    Science.gov (United States)

    2017-02-01

    The successful implementation of transportation asset management (TAM) by local governments facilitates the optimization of limited resources. The use of a data-driven TAM program helps to identify and prioritize needs, identify and dedicate resource...

  2. Communication and implementation of GIS data in fire management: a case study

    Science.gov (United States)

    Kenneth G. Boykin; Douglas I. Boykin; Rusty Stovall; Ryan. Whitaker

    2008-01-01

    Remotely sensed data and Geographical Information Systems (GIS) can be an effective tool in fire management. For the inclusion of these tools, fire management and research personnel must be effective in communication regarding needs and limitations of the data and implementing that data at various scales. A number of personnel can be involved within fire management...

  3. Volume II: Ecosystem management: principles and applications.

    Science.gov (United States)

    M.E. Jensen; P.S. Bourgeron

    1994-01-01

    This document provides land managers with practical suggestions for implementing ecosystem management. It contains 28 papers organized into five sections: historical perspectives, ecological principles, sampling design, case studies, and implementation strategies.

  4. Implementation of Supply Chain Management (SCM in pharmaceutical company, general principles and case study

    Directory of Open Access Journals (Sweden)

    Zoran Nakov

    2014-12-01

    Full Text Available Supply Chain Management (SCM in pharmaceutical industry is defined as a “responsible SCM” and its implementation is according to the principles of: business ethics, rights of labor and principles of healthy and safe working environment. Pharmaceutical companies with implemented “responsible SCM” have to use management systems to facilitate continuous improvement in accordance with their working principles. The main purpose of this management system is to ensure the consistency, reliability and continuous improvement of all workflows within an organization.The analyzed case describes the project of European generic pharmaceutical company, which intends to implement best practice SCM operations for five European manufacturing sites and European logistics organizations (active ingredients supply, distribution centers, affiliate customers and third party manufacturers. The main objectives of the project were the creation of the future improved To-Be situation through implementation of new SCM models to the existing To-Day situation.

  5. Implementing and Evaluating a Multicomponent Inpatient Diabetes Management Program: Putting Research into Practice

    Science.gov (United States)

    Munoz, Miguel; Pronovost, Peter; Dintzis, Joanne; Kemmerer, Theresa; Wang, Nae-Yuh; Chang, Yi-Ting; Efird, Leigh; Berenholtz, Sean M.; Golden, Sherita Hill

    2013-01-01

    Background Strategies for successful implementation of hospitalwide glucose control efforts were addressed in a conceptual model for the development and implementation of an institutional inpatient glucose management program. Conceptual Model Components The Glucose Steering Committee incrementally developed and implemented hospitalwide glucose policies, coupled with targeted education and clinical decision support to facilitate policy acceptance and uptake by staff while incorporating process and outcome measures to objectively assess the effectiveness of quality improvement efforts. The model includes four components: (1) engaging staff and hospital executives in the importance of inpatient glycemic management, (2) educating staff involved in the care of patients with diabetes through structured knowledge dissemination, (3) executing evidence-based inpatient glucose management through development of policies and clinical decision aids, and (4) evaluating intervention effectiveness through assessing process measures, intermediary glucometric outcomes, and clinical and economic outcomes. An educational curriculum for nursing, provider, and pharmacist diabetes education programs and current glucometrics were also developed. Outcomes Overall the average patient-day–weighted mean blood glucose (PDWMBG) was below the currently recommended maximum of 180 mg/dL in patients with diabetes and hyperglycemia, with a significant decrease in PDWMBG of 7.8 mg/dL in patients with hyperglycemia. The program resulted in an 18.8% reduction in hypoglycemia event rates, which was sustained. Conclusion Inpatient glucose management remains an important area for patient safety, quality improvement, and clinical research, and the implementation model should guide other hospitals in their glucose management initiatives. PMID:22649859

  6. Models meet data: Challenges and opportunities in implementing land management in Earth system models.

    Science.gov (United States)

    Pongratz, Julia; Dolman, Han; Don, Axel; Erb, Karl-Heinz; Fuchs, Richard; Herold, Martin; Jones, Chris; Kuemmerle, Tobias; Luyssaert, Sebastiaan; Meyfroidt, Patrick; Naudts, Kim

    2018-04-01

    As the applications of Earth system models (ESMs) move from general climate projections toward questions of mitigation and adaptation, the inclusion of land management practices in these models becomes crucial. We carried out a survey among modeling groups to show an evolution from models able only to deal with land-cover change to more sophisticated approaches that allow also for the partial integration of land management changes. For the longer term a comprehensive land management representation can be anticipated for all major models. To guide the prioritization of implementation, we evaluate ten land management practices-forestry harvest, tree species selection, grazing and mowing harvest, crop harvest, crop species selection, irrigation, wetland drainage, fertilization, tillage, and fire-for (1) their importance on the Earth system, (2) the possibility of implementing them in state-of-the-art ESMs, and (3) availability of required input data. Matching these criteria, we identify "low-hanging fruits" for the inclusion in ESMs, such as basic implementations of crop and forestry harvest and fertilization. We also identify research requirements for specific communities to address the remaining land management practices. Data availability severely hampers modeling the most extensive land management practice, grazing and mowing harvest, and is a limiting factor for a comprehensive implementation of most other practices. Inadequate process understanding hampers even a basic assessment of crop species selection and tillage effects. The need for multiple advanced model structures will be the challenge for a comprehensive implementation of most practices but considerable synergy can be gained using the same structures for different practices. A continuous and closer collaboration of the modeling, Earth observation, and land system science communities is thus required to achieve the inclusion of land management in ESMs. © 2017 John Wiley & Sons Ltd.

  7. Pharmacists' views on implementing a disease state management program for low back pain.

    Science.gov (United States)

    Abdel Shaheed, Christina; Maher, Christopher G; Williams, Kylie A; McLachlan, Andrew J

    2016-01-01

    Pharmacists have the potential to take a lead role in the primary care management of people with acute low back pain. The aim of this study was to investigate pharmacists' views on implementing a care program for people with acute low back pain in the community pharmacy. Recruitment of pharmacists for this study took place between July 2012 and March 2013. A convenience sample of 30 pharmacists who collaborated in recruiting participants for a low back pain clinical trial in Sydney (n=15 pharmacist recruiters and n=15 non-recruiters) completed an open-ended questionnaire. There was no marked variation in responses between the two groups. Participating pharmacists were receptive to the idea of implementing a care program for people with low back pain, highlighting the need for adequate reimbursement and adequate training of staff to ensure it is successful. Pharmacists identified that the follow up of people receiving such a service is dependent on several factors such as effective reminder systems and the proximity of patients to the pharmacy.

  8. Systematic Work Environment Management: experiences from implementation in Swedish small-scale enterprises.

    Science.gov (United States)

    Gunnarsson, Kristina; Andersson, Ing-Marie; Rosén, Gunnar

    2010-01-01

    Small-scale enterprises face difficulties in fulfilling the regulations for organising Systematic Work Environment Management. This study compared three groups of small-scale manufacturing enterprises with and without support for implementing the provision. Two implementation methods, supervised and network method, were used. The third group worked according to their own ideas. Twenty-three enterprises participated. The effects of the implementation were evaluated after one year by semi-structured dialogue with the manager and safety representative. Each enterprise was classified on compliance with ten demands concerning the provision. The work environment was estimated by the WEST-method. Impact of the implementation on daily work was also studied. At the follow-up, the enterprises in the supervised method reported slightly more improvements in the fulfilment of the demands in the provision than the enterprises in the network method and the enterprises working on their own did. The effect of the project reached the employees faster in the enterprises with the supervised method. In general, the work environment improved to some extent in all enterprises. Extensive support to small-scale enterprises in terms of advise and networking aimed to fulfil the regulations of Systematic Work Environment Management had limited effect - especially considering the cost of applying these methods.

  9. Implementing Environmental Practices for Accomplishing Sustainable Green Supply Chain Management

    Directory of Open Access Journals (Sweden)

    Minkyun Kim

    2017-07-01

    Full Text Available With the emergence of environmental protection as a global issue, implementing environmental practices for sustaining green supply chain management (GSCM has received a lot of attention. This study investigates the impact of integration with suppliers and supply disruption risk on environmental practices. It also examines the role of supplier integration and supply disruption risk on performance. Finally, it investigates the relationship between environmental practices and performance in order to sustain green supply chains. Based on 272 survey responses from supply and purchase managers, our research results support the positive impact of integration with suppliers and the negative impact of supply disruption risk on the adoption of environmental practices. Furthermore, they provide empirical evidence that environmental practices and integration with suppliers are positively associated with performance, while supply disruption risk is negatively associated with performance. This study identifies antecedents and establishes a research framework of GSCM. More importantly, it provides meaningful insights to managers regarding the implementation of environmental practices related to other supply chain practices for sustaining green supply chains.

  10. API manager implementation and its use for Indus accelerator control

    International Nuclear Information System (INIS)

    Merh, B.N.; Agrawal, R.K.; Barpande, K.; Fatnani, P.; Navathe, C.P.

    2012-01-01

    The control system software needed for operation of Indus accelerators is coupled to the underlying firmware and hardware of the control system by the Application Programming Interface (API) manager. In the three layered architecture of Indus control system, PVSS-II SCADA is being used at the layer-1(L1) for control and monitoring of various sub-systems. The layer-2(L2) consists of VME bus based system. The API manager plays a crucial role in interfacing the L1 and L2 of the control system. It has to interact with both the PVSS database and the L2. In order to access the PVSS database it uses the PVSS API, a C++ class library, whereas in order to access the L2 custom functions have been built. Several other custom functionalities have also been implemented. The paper presents the important aspects of the API manager like its implementation, its interface mechanism to the lower layer and features like configurability, reusable classes, multithreading capability etc. (author)

  11. Multiscale guidance and tools for implementing a landscape approach to resource management in the Bureau of Land Management

    Science.gov (United States)

    Carter, Sarah K.; Carr, Natasha B.; Miller, Kevin H.; Wood, David J.A.

    2017-01-19

    monitoring data needed to inform a landscape approach. We propose six core, broad-scale indicators of natural resource status and condition: the amount, spatial distribution, patch size and connectivity of ecosystems and wildlife habitats, and the pattern of existing development across the landscape. Additional supplemental broad-scale indicators may include fire return intervals, distributions of invasive species, and vulnerability of ecosystems to a changing climate. Landscape intactness is an additional derived indicator that is calculated from one or more of the core and supplemental broad-scale indicators. We then outline a process for assessing broad-scale indicators that is consistent with the overall BLM Assessment, Inventory, and Monitoring process, facilitating development of a multiscale natural resource monitoring program. Finally, we describe how broad-scale indicators of natural resource status and condition may guide field monitoring implemented through the BLM Assessment, Inventory and Monitoring program and help address complex management questions.In chapter 4, we consider the specific question of assessing the ecological integrity of rangelands across the western United States. We first define ecological integrity and its relation to land health. We then suggest that a combination of six local-scale indicators collected through field sampling at individual sites and five complementary broad-scale indicators together provide information on the composition, structure, and function of rangelands. The terrestrial monitoring indicators collected at the level of individual field sites are the amount of bare ground, vegetation composition (including invasive plants and plants of management concern), vegetation height, and the proportion of the soil surface in large intercanopy gaps. The broad-scale indicators are vegetation amount, distribution, patch size, connectivity, and productivity, along with the pattern of terrestrial development. Our suggested approach

  12. DOE methods for evaluating environmental and waste management samples

    International Nuclear Information System (INIS)

    Goheen, S.C.; McCulloch, M.; Thomas, B.L.; Riley, R.G.; Sklarew, D.S.; Mong, G.M.; Fadeff, S.K.

    1994-04-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) is a resource intended to support sampling and analytical activities for the evaluation of environmental and waste management samples from U.S. Department of Energy (DOE) sites. DOE Methods is the result of extensive cooperation from all DOE analytical laboratories. All of these laboratories have contributed key information and provided technical reviews as well as significant moral support leading to the success of this document. DOE Methods is designed to encompass methods for collecting representative samples and for determining the radioisotope activity and organic and inorganic composition of a sample. These determinations will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the U.S. Environmental Protection Agency, or others. The development of DOE Methods is supported by the Laboratory Management Division of the DOE. Methods are prepared for entry into DOE Methods as chapter editors, together with DOE and other participants in this program, identify analytical and sampling method needs. Unique methods or methods consolidated from similar procedures in the DOE Procedures Database are selected for potential inclusion in this document. Initial selection is based largely on DOE needs and procedure applicability and completeness. Methods appearing in this document are one of two types. open-quotes Draftclose quotes or open-quotes Verified.close quotes. open-quotes Draftclose quotes methods that have been reviewed internally and show potential for eventual verification are included in this document, but they have not been reviewed externally, and their precision and bias may not be known. open-quotes Verifiedclose quotes methods in DOE Methods have been reviewed by volunteers from various DOE sites and private corporations

  13. Implementation of the safety culture for HANARO safety management

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Jong Sup; Han, Gee Yang; Kim, Ik Soo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2008-11-15

    Safety is the fundamental principal upon which a management system is based. The IAEA INSAG(International Nuclear Safety Group) states the general aims of a safety management system. One of which is to foster and support a strong safety culture through the development and reinforcement of good safety attitudes and behavior in individuals and teams, so as to allow them to carry out their tasks safety. The safety culture activities have been implemented and the importance of a safety management in nuclear activities for a reactor application and utilization has also been emphasized for more than 10 years in HANARO which is a 30 MW multi purpose research reactor that achieved its first criticality in February 1995. The safety culture activities and implementation have been conducted continuously to enhance its safe operation such as the seminars and lectures related to safety matters, participation in international workshops and the development of safety culture indicators, a survey on the attitude of HANARO staff toward the safety culture indicators, a survey on the attitude of HANARO staff toward the safety culture, the development of operational safety performance indicators (SPIs), the preparation of a safety text book and the development of an e Learning program for a safety education purpose.

  14. Implementation of the safety culture for HANARO safety management

    International Nuclear Information System (INIS)

    Wu, Jong Sup; Han, Gee Yang; Kim, Ik Soo

    2008-01-01

    Safety is the fundamental principal upon which a management system is based. The IAEA INSAG(International Nuclear Safety Group) states the general aims of a safety management system. One of which is to foster and support a strong safety culture through the development and reinforcement of good safety attitudes and behavior in individuals and teams, so as to allow them to carry out their tasks safety. The safety culture activities have been implemented and the importance of a safety management in nuclear activities for a reactor application and utilization has also been emphasized for more than 10 years in HANARO which is a 30 MW multi purpose research reactor that achieved its first criticality in February 1995. The safety culture activities and implementation have been conducted continuously to enhance its safe operation such as the seminars and lectures related to safety matters, participation in international workshops and the development of safety culture indicators, a survey on the attitude of HANARO staff toward the safety culture indicators, a survey on the attitude of HANARO staff toward the safety culture, the development of operational safety performance indicators (SPIs), the preparation of a safety text book and the development of an e Learning program for a safety education purpose

  15. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Science.gov (United States)

    2011-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9457-6] California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of Direct Final Rule... Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143...

  16. Implementing and certifying a state of the art asset management approach - practical experiences

    NARCIS (Netherlands)

    Slootweg, J.G.; Clemens, G.J.M.B.

    2007-01-01

    Subject of the paper is the implementation of the Asset Management concept into the organization of Essent Netwerk First, the drivers for and essentials of the Asset Management concept are introduced. Then, the organization of Essent Netwerk’s Asset Management department is described. Finally, the

  17. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  18. Satellite-aided survey sampling and implementation in low- and middle-income contexts: a low-cost/low-tech alternative.

    Science.gov (United States)

    Haenssgen, Marco J

    2015-01-01

    The increasing availability of online maps, satellite imagery, and digital technology can ease common constraints of survey sampling in low- and middle-income countries. However, existing approaches require specialised software and user skills, professional GPS equipment, and/or commercial data sources; they tend to neglect spatial sampling considerations when using satellite maps; and they continue to face implementation challenges analogous to conventional survey implementation methods. This paper presents an alternative way of utilising satellite maps and digital aides that aims to address these challenges. The case studies of two rural household surveys in Rajasthan (India) and Gansu (China) compare conventional survey sampling and implementation techniques with the use of online map services such as Google, Bing, and HERE maps. Modern yet basic digital technology can be integrated into the processes of preparing, implementing, and monitoring a rural household survey. Satellite-aided systematic random sampling enhanced the spatial representativeness of the village samples and entailed savings of approximately £4000 compared to conventional household listing, while reducing the duration of the main survey by at least 25 %. This low-cost/low-tech satellite-aided survey sampling approach can be useful for student researchers and resource-constrained research projects operating in low- and middle-income contexts with high survey implementation costs. While achieving transparent and efficient survey implementation at low costs, researchers aiming to adopt a similar process should be aware of the locational, technical, and logistical requirements as well as the methodological challenges of this strategy.

  19. Demand chain management – The implementation

    Directory of Open Access Journals (Sweden)

    D Ericsson

    2011-12-01

    Full Text Available Most current supply chain models were developed during a period of relative stability. Today, the environment is discontinuous, volatile and unpredictable. This requires a major rethinking and revitalisation of existing supply chain models. Supply chains are much more than warehouses, transportation and technology, they are people powered and have to be treated as social and political as well as economic and technical systems.The most difficult yet challenging and rewarding factor is the change of mindset from approaches based on the old industrial paradigm to the new knowledge oriented paradigm. From "one size fits all" to customisation and buyer behaviour oriented segmentation based on structural flexibility. The new approach requires a change of processes and management systems, but most of all, a change of mindset, organisation structure and behaviour.This may create internal resistance that has to be overcome to reach the desired future state. This future state is highly dependent on cooperation and consensus with external companies, and the next step is therefore to extend the alignment approach to the chosen partners in the demand chain. The development towards channel rather than company competition requires an interorganisational approach to channel design. Internal alignment and cooperation is necessary but not sufficient, which means that an agile and dynamically aligned demand chain has to be created.All this is well known and documented in both research and theory. However, the challenge is to implement these theories, models and behaviour in practice. This paper presents one practical approach to implementation of the theories put forth by Ericsson [Ericsson D, 2011, Demand chain management - The evolution, ORiON, 27(1, pp. 45-81.].

  20. Knowledge Management Implementation In Indonesia Nuclear Energy Regulatory Agency (BAPETEN)

    International Nuclear Information System (INIS)

    Nurwidi Astuti, Y.H.

    2016-01-01

    Full text: Indonesian Nuclear Energy Regulatory Agency (BAPETEN) acquires the task and function to control the safety, security and safeguards in the field of nuclear energy through the development of legislation, licensing services, inspection and enforcement. Which is supported by review and assessment, emergency preparedness. Knowledge Management (KM) is importance for BAPETEN to achieve the Regulatory body effectiveness and product innovation. The Chairman of BAPETEN has set policies statement for KM implementation. To implement a knowledge management program, BAPETEN creates KM guidelines that includes blueprint and roadmap KM programme based on a KM readiness survey. The KM readiness survey involves 20% of staff who represent each unit and discussions with the senior manager of BAPETEN, and the result of readiness survey produce 13 KM BAPETEN initiatives strategic. After the initiative strategic has been obtained, BAPETEN creates the Roadmap of BAPETEN Knowledge Management for 2015–2019 programme for KM People with the activity sozialization of KM Guidebook, workshop SMART knowledge worker, nurture Community of practices (COP) and develop social network analysis (SNE). KM Process with activity focus group discussion, KM Readyness survey, KM Statement, KM Bapeten Guidebook, knowledge mapping, knowledge harvesting. KM Technology with activity develop knowledge system or portal, e-learning. (author

  1. METHODOLOGICAL BASES OF THE OPTIMIZATION OF ORGANIZATIONAL MANAGEMENT STRUCTURE AT IMPLEMENTING THE MAJOR CONSTRUCTION ENTERPRISE STRATEGY

    Directory of Open Access Journals (Sweden)

    Rodionova Svetlana Vladimirovna

    2015-09-01

    Full Text Available Planning and implementation of innovations on the microlevel of management and on the higher levels is a process of innovative projects portfolio implementation. Project management is aimed at some goal; therefore, defining the mission and aims of implementation is of primary importance. These are the part of the notion of development strategy of an enterprise. Creating a strategy for big construction holding companies is complicated by the necessity to account for different factors effecting each business-block and subsidiary companies. The authors specify an algorithm of development and implementation of the activity strategy of a big construction enterprise. A special importance of the correspondence of organizational management structure to the implemented strategy is shown. The innovative character of organizational structure change is justified. The authors offer methods to optimize the organizational management structure based on communication approach with the use of the elements graph theory. The offered methodological provisions are tested on the example of the Russian JSC “RZhDstroy”.

  2. Developing Leadership in Managers to Facilitate the Implementation of National Guideline Recommendations: A Process Evaluation of Feasibility and Usefulness

    Science.gov (United States)

    Tistad, Malin; Palmcrantz, Susanne; Wallin, Lars; Ehrenberg, Anna; Olsson, Christina B.; Tomson, Göran; Holmqvist, Lotta Widén; Gifford, Wendy; Eldh, Ann Catrine

    2016-01-01

    Background: Previous research supports the claim that managers are vital players in the implementation of clinical practice guidelines (CPGs), yet little is known about interventions aiming to develop managers’ leadership in facilitating implementation. In this pilot study, process evaluation was employed to study the feasibility and usefulness of a leadership intervention by exploring the intervention’s potential to support managers in the implementation of national guideline recommendations for stroke care in outpatient rehabilitation. Methods: Eleven senior and frontline managers from five outpatient stroke rehabilitation centers participated in a four-month leadership intervention that included workshops, seminars, and teleconferences. The focus was on developing knowledge and skills to enhance the implementation of CPG recommendations, with a particular focus on leadership behaviors. Each dyad of managers was assigned to develop a leadership plan with specific goals and leadership behaviors for implementing three rehabilitation recommendations. Feasibility and usefulness were explored through observations and interviews with the managers and staff members prior to the intervention, and then one month and one year after the intervention. Results: Managers considered the intervention beneficial, particularly the participation of both senior and frontline managers and the focus on leadership knowledge and skills for implementing CPG recommendations. All the managers developed a leadership plan, but only two units identified goals specific to implementing the three stroke rehabilitation recommendations. Of these, only one identified leadership behaviors that support implementation. Conclusion: Managers found that the intervention was delivered in a feasible way and appreciated the focus on leadership to facilitate implementation. However, the intervention appeared to have limited impact on managers’ behaviors or clinical practice at the units. Future

  3. Developing Leadership in Managers to Facilitate the Implementation of National Guideline Recommendations: A Process Evaluation of Feasibility and Usefulness

    Directory of Open Access Journals (Sweden)

    Malin Tistad

    2016-08-01

    Full Text Available Background: Previous research supports the claim that managers are vital players in the implementation of clinical practice guidelines (CPGs, yet little is known about interventions aiming to develop managers’ leadership in facilitating implementation. In this pilot study, process evaluation was employed to study the feasibility and usefulness of a leadership intervention by exploring the intervention’s potential to support managers in the implementation of national guideline recommendations for stroke care in outpatient rehabilitation. Methods: Eleven senior and frontline managers from five outpatient stroke rehabilitation centers participated in a fourmonth leadership intervention that included workshops, seminars, and teleconferences. The focus was on developing knowledge and skills to enhance the implementation of CPG recommendations, with a particular focus on leadership behaviors. Each dyad of managers was assigned to develop a leadership plan with specific goals and leadership behaviors for implementing three rehabilitation recommendations. Feasibility and usefulness were explored through observations and interviews with the managers and staff members prior to the intervention, and then one month and one year after the intervention. Results: Managers considered the intervention beneficial, particularly the participation of both senior and frontline managers and the focus on leadership knowledge and skills for implementing CPG recommendations. All the managers developed a leadership plan, but only two units identified goals specific to implementing the three stroke rehabilitation recommendations. Of these, only one identified leadership behaviors that support implementation. Conclusion: Managers found that the intervention was delivered in a feasible way and appreciated the focus on leadership to facilitate implementation. However, the intervention appeared to have limited impact on managers’ behaviors or clinical practice at the

  4. Implementation of a bridge management system in the municipal environment

    CSIR Research Space (South Africa)

    Nordengen, Paul A

    2006-10-01

    Full Text Available This paper describes the implementation of a bridge management system (BMS) in the municipal environment, with specific reference to the City of Cape Town, the Johannesburg Roads Agency and the Nelson Mandela Metropolitan Municipality...

  5. NASE 2015: Implementation of a Management Quality System

    Science.gov (United States)

    Ros, Rosa Maria; García, Beatriz; Santa Maria, Delia

    2015-08-01

    ISO 29990:2010, Learning services for non-formal education and training - Basic requirements for service providers, proposes enhance transparency and allow comparison on a worldwide basis of learning services, offering a single alternative backed by international consensus to the huge variety of national service and management standards which now exists in the field of non-formal learning. The objective of ISO 29990:2010 is to provide a generic model for quality professional practice and performance, and a common reference for learning service providers and their clients in the design, development and delivery of non-formal education, training and development.NASE project, which was born as a consequence of the implementation of IAU-10 Years Strategic Plan and it is in agreement with the proposal to increase the interest and efforts of IAU on schools before the university and constitutes good objective for the implementation of ISO 29990-2010.Taking into account the main objectives of the Strategic Plan, it is possible to remark that NASE acts on all the education levels, and had, during the past 5 years a big impact because Ministries of Education, Universities and Planetariums are involved. After 5 years NASE organized more than 60 courses in about 20 countries distributed in America, Africa, Asia and Europe. In many countries local governments changed their curriculum according NASE course contents (i.e. Nicaragua, Argentina and Honduras).The knowledge obtained by teachers is evaluated by the department of education of the local government or universities who participated. NASE acts as part of the Professional formation of Professors in Science and in this sense is a Program directed to the Tertiary and University Education.After 5 years of development, we present the implementation of a Quality Management System, according to ISO 29990:2010, devoted to Learning services for non-formal education and training. Basic requirements for service providers, and show

  6. Implementation of Quality Management System for Historical Building Conservation

    Directory of Open Access Journals (Sweden)

    Zahari N.F.

    2014-01-01

    Full Text Available The main objectives of this study are twofold. Firstly, to identify the implementation of ISO 9001 procedures being used as references for conservation works and the development of Quality Management System (QMS guidelines. Data were solicited from three (3 conservation areas. The analysis involved of descriptive approach and statistical methods. The findings revealed that QMS is not structurally established, implemented and enforced as part of conservation practice in Malaysia. From the findings, the authors hope to give clear perception to the reader on current preservation practice and the existence of QMS with reference to ISO 9001 for future conservation mechanism.

  7. Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Kimberlyn C. Mousseau

    2011-12-01

    The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

  8. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    International Nuclear Information System (INIS)

    Wecks, M.D.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  9. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste storage

    International Nuclear Information System (INIS)

    Kaspar, J.R.; Latray, D.A.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  10. Constraints to Senior Management's Capacity to Implement the Performance Management System in Senior Secondary Schools in Botswana

    Science.gov (United States)

    Bulawa, Philip

    2013-01-01

    The performance management system in different forms has been in existence in many countries for some years. In 1999 Botswana like other countries decided to implement a performance management system (PMS) across the entire public service including schools. At its introduction, the government explained the purpose for which this reform was being…

  11. Implementing Participatory Water Management: Recent Advances in Theory, Practice, and Evaluation

    Directory of Open Access Journals (Sweden)

    Yorck von Korff

    2012-03-01

    Full Text Available Many current water planning and management problems are riddled with high levels of complexity, uncertainty, and conflict, so-called "messes" or "wicked problems." The realization that there is a need to consider a wide variety of values, knowledge, and perspectives in a collaborative decision making process has led to a multitude of new methods and processes being proposed to aid water planning and management, which include participatory forms of modeling, planning, and decision aiding processes. However, despite extensive scientific discussions, scholars have largely been unable to provide satisfactory responses to two pivotal questions: (1 What are the benefits of using participatory approaches?; (2 How exactly should these approaches be implemented in complex social-ecological settings to realize these potential benefits? In the study of developing social-ecological system sustainability, the first two questions lead to a third one that extends beyond the one-time application of participatory approaches for water management: (3 How can participatory approaches be most appropriately used to encourage transition to more sustainable ecological, social, and political regimes in different cultural and spatial contexts? The answer to this question is equally open. This special feature on participatory water management attempts to propose responses to these three questions by outlining recent advances in theory, practice, and evaluation related to the implementation of participatory water management. The feature is largely based on an extensive range of case studies that have been implemented and analyzed by cross-disciplinary research teams in collaboration with practitioners, and in a number of cases in close cooperation with policy makers and other interested parties such as farmers, fishermen, environmentalists, and the wider public.

  12. Influencing Change : Organizational Change and the Implementation of Self-Managing Teams

    OpenAIRE

    Bergman, Amanda; Mashouri, Mastaneh

    2017-01-01

    Organizational changes are inevitable, yet up to 70% fail. Technological development and competition in a volatile environment require more flexible organizations. As such, implementing self-managed teams (SMTs) has become a more common approach. The fact that SMTs ought to be self-managed has further raised a debate, since it is argued that some form of manager still is required. Therefore, the following research question was proposed; How does the interplay of influences unfold between the ...

  13. The XML approach to implementing space link extension service management

    Science.gov (United States)

    Tai, W.; Welz, G. A.; Theis, G.; Yamada, T.

    2001-01-01

    A feasibility study has been conducted at JPL, ESOC, and ISAS to assess the possible applications of the eXtensible Mark-up Language (XML) capabilities to the implementation of the CCSDS Space Link Extension (SLE) Service Management function.

  14. Metastructuration actions of management: critical for stakeholder intervention in IS/IT implementations

    NARCIS (Netherlands)

    Dr. Ben Fruytier; Benny de Waal; Ronald Batenburg

    2012-01-01

    Metastructuration actions (overarching activities from management that shape and align users’ activities of IS/IT use) are often advocated to improve the success of IS/IT implementation. But how can management support enhance the success of IS/IT by metastructuration actions, when they are dealing

  15. Real-time recursive hyperspectral sample and band processing algorithm architecture and implementation

    CERN Document Server

    Chang, Chein-I

    2017-01-01

    This book explores recursive architectures in designing progressive hyperspectral imaging algorithms. In particular, it makes progressive imaging algorithms recursive by introducing the concept of Kalman filtering in algorithm design so that hyperspectral imagery can be processed not only progressively sample by sample or band by band but also recursively via recursive equations. This book can be considered a companion book of author’s books, Real-Time Progressive Hyperspectral Image Processing, published by Springer in 2016. Explores recursive structures in algorithm architecture Implements algorithmic recursive architecture in conjunction with progressive sample and band processing Derives Recursive Hyperspectral Sample Processing (RHSP) techniques according to Band-Interleaved Sample/Pixel (BIS/BIP) acquisition format Develops Recursive Hyperspectral Band Processing (RHBP) techniques according to Band SeQuential (BSQ) acquisition format for hyperspectral data.

  16. Organizational Factors that Affect the Implementation of Information Technology: Perspectives of Middle Managers in Iran.

    Science.gov (United States)

    Barzekar, Hosein; Karami, Mahtab

    2014-10-01

    to examine the organizational factors affecting the application of information technology in hospitals. Since the organizational factors are one of the most important determinants of successful projects, by understanding their impact and identifying them it can help planning a systematic IT implementation. In this cross-sectional descriptive study 110 middle managers were chosen from teaching hospitals. Structured questionnaire was used for the data collection. There was a significant relationship between organization resource, organizational knowledge, process, management structure and values and goals with implementation of information technology. Findings showed that organizational factors had a considerable impact on implementation of information technology. Top managers must consider the important aspects of effective organizational factors.

  17. Remedial Action and Waste Disposal Project Manager's Implementing Instructions

    International Nuclear Information System (INIS)

    Dronen, V.R.

    1998-01-01

    These Project Manager's Implementing Instructions provide the performance standards required of all Environmental Restoration Contractor personnel in their work during operation and administration of the Remedial Action and Waste Disposal Project. The instructions emphasize technical competency, workplace discipline, and personal accountability to ensure a high level of safety and performance during operations activities

  18. Enhancing Trust Management for Wireless Intrusion Detection via Traffic Sampling in the Era of Big Data

    DEFF Research Database (Denmark)

    Meng, Weizhi; Li, Wenjuan; Su, Chunhua

    2017-01-01

    many kinds of information among sensors, whereas such network is vulnerable to a wide range of attacks, especially insider attacks, due to its natural environment and inherent unreliable transmission. To safeguard its security, intrusion detection systems (IDSs) are widely adopted in a WSN to defend...... against insider attacks through implementing proper trustbased mechanisms. However, in the era of big data, sensors may generate excessive information and data, which could degrade the effectiveness of trust computation. In this paper, we focus on this challenge and propose a way of combining Bayesian......-based trust management with traffic sampling for wireless intrusion detection under a hierarchical structure. In the evaluation, we investigate the performance of our approach in both a simulated and a real network environment. Experimental results demonstrate that packet-based trust management would become...

  19. How to manage barriers to formation and implementation of policy packages in transport

    DEFF Research Database (Denmark)

    Åkerman, Jonas; Gudmundsson, Henrik; Sørensen, Claus Hedegaard

    2011-01-01

    The aim of this study has been to explore success factors and barriers to the formation and implementation of single policy measures and policy packages in transport, and to identify strategies to manage such barriers. As a first step, we developed a typology of barriers and success factors...... for policy formation and implementation. Secondly, we carried out an empirical analysis of barriers and success factors in four cases of policy packaging: Urban Congestion Charging; National Heavy Vehicle Fees; Aviation in the European Emissions Trading System and The EU’s First Railway Package. The third...... and final task was to identify more general strategies to manage barriers in policy formation and implementation. A main conclusion in this report is that a conscious application of these strategies may contribute significantly to successful formation and implementation of even controversial policies...

  20. Design and implementation of integrated solid wastes management pattern in industrial zones, case study of Shahroud, Iran.

    Science.gov (United States)

    Saeid, Nazemi; Roudbari, Aliakbar; Yaghmaeian, Kamyar

    2014-01-14

    The aim of the study was to design and implementation of integrated solid wastes management pattern in Shahroud industrial zone, evaluates the results and determine possible performance problems. This cross - sectional study was carried out for 4 years in Shahroud industrial zone and the implementation process included:1- Qualitative and quantitative analysis of all solid waste generated in the city, 2- determine the current state of solid waste management in the zone and to identify programs conducted, 3- Design and implementation of integrated solid wastes management pattern including design and implementation of training programs, laws, penalties and incentives and explain and implement programs for all factories and 4- The monitoring of the implementation process and determine the results. Annually, 1,728 tons of solid wastes generated in the town including 1603 tons of industrial wastes and 125 tons of municipal wastes. By implementing this pattern, the two separated systems of collection and recycling of domestic and industrial wastes was launched in this zone. Also consistent with the goals, the amount of solid wastes generated and disposed in 2009 was 51.5 and 28.6 kg per 100 million Rials production, respectively. Results showed that implementation of pattern of separated collection, training programs, capacity building, providing technical services, completing chain of industries and strengthening the cooperation between industrial estate management and industrial units could greatly reduce the waste management problems.

  1. Vehicle to Grid Implementation and Battery Management Optimization

    OpenAIRE

    Zhao, Yuchen

    2017-01-01

    ABSTRACT OF THE DISSERTATIONVehicle to Grid Implementation and Battery Management OptimizationbyYuchen ZhaoMaster of Science, Graduate Program in Electrical EngineeringUniversity of California, Riverside, September 2017Dr. Matthew Barth, Chairperson The need for energy independence and rising environmental pollution concerns are factors that drive the growing popularity of electric vehicles (EV), including electric and plug-in hybrid cars. Studies indicate the for 90% of the Americans who use...

  2. Hotel smoking policies and their implementation: a survey of California hotel managers.

    Science.gov (United States)

    Zakarian, Joy M; Quintana, Penelope J E; Winston, Carl H; Matt, Georg E

    2017-01-01

    Most states in the U.S. permit hotels to allow smoking in some guest rooms, and only five (Indiana, Michigan, North Dakota, Vermont, and Wisconsin) require that all hotel and motel rooms be 100% smoke-free (State and local 100% smokefree hotel and motel guest room laws enacted as of July 3, 2017). Little is known, however, about how hotels' smoking policies have been implemented. This study examined hotels' smoking policies and their implementation. A telephone survey of a random sample of 383 California hotel managers was conducted. Overall, 60.6% of hotels reported that smoking was prohibited in all guest rooms, and 4.7% reported that smoking was prohibited everywhere on their property. While California law permitted smoking in up to 65% of guest rooms, only 6.9% of rooms were reported as smoking-permitted. Over 90% of hotels had smoking rooms scattered among nonsmoking rooms, and about half of the smoking hotels reported that guests requesting either smoking or nonsmoking rooms were sometimes assigned to the other room type. When guests smoked in nonsmoking rooms fees could be substantial, but were often uncollected. Hotel smoking policies and their implementation fall short of protecting nonsmoking guests and workers from exposure to secondhand and thirdhand smoke. Complete indoor smoking bans for all hotels are needed to close existing loopholes. Nonsmokers who wish to protect themselves from exposure to tobacco smoke should avoid hotels that permit smoking and instead stay in completely smoke-free hotels.

  3. Designing and implementing a geographical information system: A guide for managers of area-wide pest management programmes

    International Nuclear Information System (INIS)

    2006-04-01

    Over the past two decades, the use of computer software and mapping methods known as geographical information systems (GIS) has been adopted by an ever growing variety of professionals. Every activity that deals with location dependent information can use GIS, and agriculture is no exception. The potential of GIS and remote sensing (RS) to facilitate the planning and implementation of areawide integrated pest management (AW-IPM) programmes is enormous but unfortunately, these methods are still much underused. AW-IPM programmes, especially those that integrate the sterile insect technique (SIT) with other surveillance and control methods, would benefit considerably by drawing on GIS/RS. These programmes are often implemented over large areas of even tens of thousands of square kilometres, where surveillance methods are deployed and large data sets are systematically generated on a daily basis. The acquisition of geo-referenced data sets on pest presence/absence, relative abundance, disease prevalence, crop damage, etc., that will allow accurate spatial and temporal analysis is important for proper and timely decision making to efficiently plan and implement any operational pest management programme. Animal health and plant protection officials and pest control programme managers might be intuitively aware of the importance of employing GIS as an analytical tool. However, they often lack a deeper understanding of its capabilities. Since GIS is a desk exercise using computers, data analysis is often left to the computer staff without proper directives from the programme managers on programmatic needs. This is unfortunate as it will usually NOT bring the desired GIS-processed information to the decision makers. This manual targets area-wide pest control programme administrators and managers of FAO and IAEA Member States in an attempt to demonstrate the type of data processing and spatial analysis that can be expected of GIS. The manual does not aim to provide

  4. 12 CFR 563b.500. - What management stock benefit plans may I implement?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What management stock benefit plans may I... management stock benefit plans may I implement? (a) During the 12 months after your conversion, you may... employee stock benefit plan (collectively, ESOP), and a management recognition plan (MRP), provided you...

  5. Implementation of burnup credit in spent fuel management systems

    International Nuclear Information System (INIS)

    Dyck, H.P.

    2001-01-01

    Improved calculational methods allow one to take credit for the reactivity reduction associated with fuel burnup. This means reducing the analysis conservatism while maintaining an adequate safety margin. The motivation for using burnup credit in criticality safety applications is based on economic considerations and additional benefits contributing to public health and safety and resource conservation. Interest in the implementation of burnup credit has been shown by many countries. In 1997, the International Atomic Energy Agency (IAEA) started a task to monitor the implementation of burnup credit in spent fuel management systems, to provide a forum to exchange information, to discuss the matter and to gather and disseminate information on the status of national practices of burnup credit implementation in the Member States. The task addresses current and future aspects of burnup credit. This task was continued during the following years. (author)

  6. Evidence-based management of ambulatory electronic health record system implementation: an assessment of conceptual support and qualitative evidence.

    Science.gov (United States)

    McAlearney, Ann Scheck; Hefner, Jennifer L; Sieck, Cynthia; Rizer, Milisa; Huerta, Timothy R

    2014-07-01

    While electronic health record (EHR) systems have potential to drive improvements in healthcare, a majority of EHR implementations fall short of expectations. Shortcomings in implementations are often due to organizational issues around the implementation process rather than technological problems. Evidence from both the information technology and healthcare management literature can be applied to improve the likelihood of implementation success, but the translation of this evidence into practice has not been widespread. Our objective was to comprehensively study and synthesize best practices for managing ambulatory EHR system implementation in healthcare organizations, highlighting applicable management theories and successful strategies. We held 45 interviews with key informants in six U.S. healthcare organizations purposively selected based on reported success with ambulatory EHR implementation. We also conducted six focus groups comprised of 37 physicians. Interview and focus group transcripts were analyzed using both deductive and inductive methods to answer research questions and explore emergent themes. We suggest that successful management of ambulatory EHR implementation can be guided by the Plan-Do-Study-Act (PDSA) quality improvement (QI) model. While participants did not acknowledge nor emphasize use of this model, we found evidence that successful implementation practices could be framed using the PDSA model. Additionally, successful sites had three strategies in common: 1) use of evidence from published health information technology (HIT) literature emphasizing implementation facilitators; 2) focusing on workflow; and 3) incorporating critical management factors that facilitate implementation. Organizations seeking to improve ambulatory EHR implementation processes can use frameworks such as the PDSA QI model to guide efforts and provide a means to formally accommodate new evidence over time. Implementing formal management strategies and incorporating

  7. Maximize Your Investment 10 Key Strategies for Effective Packaged Software Implementations

    CERN Document Server

    Beaubouef, Grady Brett

    2009-01-01

    This is a handbook covering ten principles for packaged software implementations that project managers, business owners, and IT developers should pay attention to. The book also has practical real-world coverage including a sample agenda for conducting business solution modeling, customer case studies, and a road map to implement guiding principles. This book is aimed at enterprise architects, development leads, project managers, business systems analysts, business systems owners, and anyone who wants to implement packaged software effectively. If you are a customer looking to implement COTS s

  8. Implementation of Environmental Flows for Intermittent River Systems: Adaptive Management and Stakeholder Participation Facilitate Implementation

    Science.gov (United States)

    Conallin, John; Wilson, Emma; Campbell, Josh

    2018-03-01

    Anthropogenic pressure on freshwater ecosystems is increasing, and often leading to unacceptable social-ecological outcomes. This is even more prevalent in intermittent river systems where many are already heavily modified, or human encroachment is increasing. Although adaptive management approaches have the potential to aid in providing the framework to consider the complexities of intermittent river systems and improve utility within the management of these systems, success has been variable. This paper looks at the application of an adaptive management pilot project within an environmental flows program in an intermittent stream (Tuppal Creek) in the Murray Darling Basin, Australia. The program focused on stakeholder involvement, participatory decision-making, and simple monitoring as the basis of an adaptive management approach. The approach found that by building trust and ownership through concentrating on inclusiveness and transparency, partnerships between government agencies and landholders were developed. This facilitated a willingness to accept greater risks and unintended consequences allowing implementation to occur.

  9. Implementation of Participatory Forest Management in Kenya

    DEFF Research Database (Denmark)

    Thygesen, S. H.; Løber, Trine; Skensved, E.M.

    2016-01-01

    This paper analyzes the distribution of powers before and after the implementation of participatory forest management (PFM) in Kenya. The paper is a case study of the Karima forest in the Central Highlands of Kenya. The study relies primarily on 34 semi-structured interviews with key actors...... of the forest communities and weak downward accountability relations. Finally, it illustrates a planning process, which has weaknesses in participation and inclusiveness. Consequently, the paper suggests three areas for PFM policy reform in Kenya: (i) the role (powers) and function of CFAs; (ii) benefit sharing...

  10. Key elements on implementing an occupational health and safety management system using ISO 45001 standard

    Directory of Open Access Journals (Sweden)

    Darabont Doru Costin

    2017-01-01

    Full Text Available Occupational health and safety (OHS management system is one of the main elements of the company’s general management system. During last decade, Romanian companies gained a valuable experience on implementing this type of management systems, using OHSAS 18001 referential and standard. However, the projected release of the ISO 45001 represents a new approach which requires the companies to take in consideration new key elements for a successful implementation of the OHS management system. The aim of the paper is to identify and analyse these key elements, by integration of the following issues: standard requirements, Romanian OHS legislation and good practice examples, including the general control measures for new and emerging risks such as psycho-social risks, workforce ageing and new technologies. The study results represent an important work instrument for each company interested to implement or upgrade its OHS management system using ISO 45001 standard and could be used regardless the company size or activity domain.

  11. Factors in Organisational Environmental Management System Implementation – Developed vs. Developing Country Contexts

    OpenAIRE

    Kola-Lawal, Constance; Wood, Mike; Alo, Babajide; Clark, Andrew

    2014-01-01

    Country specificities and national cultures influence Environmental Management Systems (EMS) implementation and pro-environmental behaviour in organisations. Previous studies have focused on organisations in developed or emerging economies, creating a need to establish the extent to which findings are applicable to developing counterparts. This paper presents EMS implementation from a developing country perspective, reporting on EMS implementation factors (drivers, benefits, barriers) affecti...

  12. Global Access Programs: A Collaborative Approach for Effective Implementation and Management.

    Science.gov (United States)

    Ainge, Debra; Aitken, Suzanne; Corbett, Mark; De-Keyzer, David

    Global access programs (GAPs) provide access to medicinal products for patients with serious medical conditions and no commercially available treatment options. Providing early access to medicines can be challenging for a pharmaceutical company. The demand for a GAP often occurs at a time when other activities are the prime focus, such as delivery of pivotal clinical trials or gaining of marketing authorization. Furthermore, the skills, experience, and infrastructure necessary to implement and manage a successful GAP vary significantly from those required for regular clinical trial execution, and the regulatory environment presents its own challenges, with regulations often poorly defined and with considerable inter-country variation. This article considers the triggers for early access requests and examines the need for companies to develop a global strategy for GAPs in order to respond appropriately to requests for early access. It also provides a comprehensive overview of the processes for GAP set-up, implementation, management, and closure, along with the considerations affecting the type and scope of GAP, such as demand, regulatory feasibility, license status of the product, drug pricing structure, company strategy, costs, and product supply. Also discussed is the need for appropriate personnel to implement and manage the GAP, and when to consider collaboration with an external GAP provider. In summary, GAPs require careful and efficient planning and management, from set-up to closure. Well-run GAPs provide an ethical and regulatory-compliant pathway for access of new treatments to patients with serious conditions and an unmet medical need.

  13. Computerized Analytical Data Management System and Automated Analytical Sample Transfer System at the COGEMA Reprocessing Plants in La Hague

    International Nuclear Information System (INIS)

    Flament, T.; Goasmat, F.; Poilane, F.

    2002-01-01

    Managing the operation of large commercial spent nuclear fuel reprocessing plants, such as UP3 and UP2-800 in La Hague, France, requires an extensive analytical program and the shortest possible analysis response times. COGEMA, together with its engineering subsidiary SGN, decided to build high-performance laboratories to support operations in its plants. These laboratories feature automated equipment, safe environments for operators, and short response times, all in centralized installations. Implementation of a computerized analytical data management system and a fully automated pneumatic system for the transfer of radioactive samples was a key factor contributing to the successful operation of the laboratories and plants

  14. Implementing new public management in Zimbabwe: Challenges and obstacles

    Directory of Open Access Journals (Sweden)

    Daniel Chigudu

    2014-06-01

    Full Text Available This paper is an exploratory study of the new public management (NPM’s implementation in Zimbabwe. The data presented is a review of the government’s policy initiatives and research publications. Findings suggest fragmented implementation of NPM reforms without requisite administrative skills, lack of resources, ill timing, and political inertia. This research’s underlying significance is that it provides insights to improve NPM and future public sector reforms. It contributes to relevant literature by filling gaps in the research on NPM in Zimbabwe The paper provides policy recommendations necessary for addressing public sector reforms in developing economies particularly in African countries that have a history of political instability.

  15. Environmental management practices in the Lebanese pharmaceutical industries: implementation strategies and challenges.

    Science.gov (United States)

    Massoud, May A; Makarem, N; Ramadan, W; Nakkash, R

    2015-03-01

    This research attempts to provide an understanding of the Lebanese pharmaceutical industries' environmental management strategies, priorities, and perceptions as well as drivers, barriers, and incentives regarding the implementation of the voluntary ISO 14001 Environmental Management System. Accordingly, a semistructured in-depth interview was conducted with the pharmaceutical industries. The findings revealed a significant lack of knowledge about the standard among the industries. The main perceived drivers for adopting the ISO 14001 are improving the companies' image and overcoming international trade. The main perceived barriers for acquiring the standard are the lack of government support and the fact that ISO 14001 is not being legally required or enforced by the government. Moreover, results revealed that adopting the ISO 14001 standard is not perceived as a priority for the Lebanese pharmaceutical industries. Although the cost of certification was not considered as a barrier for the implementation of ISO 14001, the majority of the pharmaceutical industries are neither interested nor willing to adopt the Standard if they are not exposed to any regulatory pressure or external demand. They are more concerned with quality and safety issues with the most adopted international standard among the industries being the ISO 9001 quality management system. This study highlights the aspect that financial barriers are not always the hurdles for implementing environmental management strategies in developing countries and underscores the need for regulatory frameworks and enforcement.

  16. Relationships between the implementation of quality management strategies and clinical outcomes in European hospitals.

    NARCIS (Netherlands)

    Suñol, R.; Arah, O.A.; Wagner, C.; Groene, O.

    2013-01-01

    Objectives: Considerable resources are spent on implementing hospital and departmental quality management strategies. Yet, the evidence on the factors associated with the uptake of hospitals of quality management and the impact of quality management systems on clinical outcomes is limited. We

  17. Environmental and Social Management System Implementation Handbook : Animal Production

    OpenAIRE

    International Finance Corporation

    2014-01-01

    Environmental and social responsibility is becoming more and more important in todayapos;s global economy. There are thousands of environmental and social codes and standards in the world today. The codes and standards define the rules and the objectives. But the challenge is in the implementation. An environmental and social management system (ESMS) helps companies to integrate the ru...

  18. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan Air Quality...

  19. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... approve revisions to the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan...

  20. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct... Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD...

  1. Facilitators and Barriers to Implementing Clinical Governance: A Qualitative Study among Senior Managers in Iran.

    Science.gov (United States)

    Ravaghi, Hamid; Rafiei, Sima; Heidarpour, Peigham; Mohseni, Maryam

    2014-09-01

    Health care systems should assign quality improvement as their main mission. Clinical governance (CG) is a key strategy to improve quality of health care services. The Iranian Ministry of Health and Medical Education (MOHME) has promoted CG as a framework for safeguarding quality and safety in all hospitals since 2009. The purpose of this study was to explore perceived facilitators and barriers to implementing CG by deputies for curative affairs of Iranian medical universities. A qualitative study was conducted using face to face interviews with a purposeful sample of 43 deputies for curative affairs of Iranian Medical Universities and documents review. Thematic analysis was used to analyze the data. Five themes were explored including: knowledge and attitude toward CG, culture, organizational factors, managerial factors and barriers. The main perceived facilitating factors were adequate knowledge and positive attitude toward CG, supporting culture, managers' commitment, effective communication and well designed incentives. Pe rceived barriers were the reverse of facilitators noted above in addition to insufficient resources, legal challenges, workload and parallel quality programs. Successful implementation of CG in Iran will require identifying barriers and challenges existing in the way of CG implementation and try to mitigate them by using appropriate facilitators.

  2. ON EXPERIENCE OF THE ELECTRONIC DOCUMENT MANAGEMENT SYSTEM IMPLEMENTATION IN THE MEDICAL UNIVERSITY

    OpenAIRE

    A. V. Semenets; V. Yu. Kovalok

    2015-01-01

    An importance of the application of the electronic document management to the Ukraine healthcare is shown. The electronic document management systems market overview is presented. Example of the usage of the open-source electronic document management system in the Ternopil State Medical University by I. Ya. Horbachevsky is shown. The implementation capabilities of the electronic document management system within a cloud services are shown. The electronic document management features of the Mi...

  3. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  4. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  5. Development and Implementation of a Pharmacist-Managed Clinical Pharmacogenetics Service

    Science.gov (United States)

    Crews, Kristine R.; Cross, Shane J.; McCormick, John N.; Baker, Donald K.; Molinelli, Alejandro R.; Mullins, Richard; Relling, Mary V.; Hoffman, James M.

    2011-01-01

    Purpose The development and implementation of a pharmacist-managed Clinical Pharmacogenetics service is described. Summary Therapeutic drug monitoring (TDM) is a well-accepted role of the pharmacist. Pharmacogenetics, the study of genetic factors that influence the variability in drug response among patients, is a rapidly evolving discipline that integrates knowledge of pharmacokinetics and pharmacodynamics with modern advances in genetic testing. There is growing evidence for the clinical utility of pharmacogenetics, and pharmacists can play an essential role in the thoughtful application of pharmacogenetics to patient care. A pharmacist-managed Clinical Pharmacogenetics service was designed and implemented. The goal of the service is to provide clinical pharmacogenetic testing for gene products important to the pharmacodynamics of medications used in our patients. The service is modeled after and integrated with an already established Clinical Pharmacokinetics service. All clinical pharmacogenetic test results are first reported to one of the pharmacists, who reviews the result and provides a written consult. The consult includes an interpretation of the result and recommendations for any indicated changes to therapy. In 2009, 136 clinical pharmacogenetic tests were performed, consisting of 66 TPMT tests, 65 CYP2D6 tests, and 5 UGT1A1 tests. Our service has been met with positive clinician feedback. Conclusion Our experience demonstrates the feasibility of the design and function of a pharmacist-managed Clinical Pharmacogenetics service at an academic specialty hospital. The successful implementation of this service highlights the leadership role that pharmacists can take in moving pharmacogenetics from research to patient care, thereby potentially improving patient outcomes. PMID:21200062

  6. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0180; FRL-9652-3] Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District portion of the California State Implementation Plan...

  7. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0276; FRL-9139-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  8. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9670-9] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  9. Power management implementation in FreeRTOS on LM3S3748

    Directory of Open Access Journals (Sweden)

    Simonović Mirela

    2013-01-01

    Full Text Available Power consumption has become a major concern of embedded systems today. With the aim to reduce power consumption during the runtime, operating systems are dealing with power management. In this work, the FreeRTOS port is extended with power management features on LM3S3748 microcontroller. Tickless idle technique is implemented to provide more powersaving during the processor idle periods.

  10. RESISTANCE TO CHANGE AND ERP IMPLEMENTATION SUCCESS: THE MODERATING ROLE OF CHANGE MANAGEMENT INITIATIVES

    Directory of Open Access Journals (Sweden)

    Zafar U. Ahmed

    2006-01-01

    Full Text Available Enterprise Resource Planning (ERP is a useful tool that builds strong capabilities, improves performance, supports better decision making, and provides competitive advantage for businesses. ERP aims to help the management by setting better business practices and equipping them with the right information to take timely decision. In any new technology implementation, one of the issues that need to be addressed is the resistance to change. Many implementations have failed due to strong resistance from the end users. Thus, the main purpose of this paper is to test the impact of resistance to change on ERP's implementation success and how change management initiatives acts in the capacity of a moderating role. Using data collected from 69 manufacturing organizations through a mail survey, it was found that resistance to change is negatively related to achievement of predetermined goals (b = –0.930, p < 0.01 and usersatisfaction (b = –0.952, p < 0.01. Further, change management initiatives did not moderate the relationship between resistance and predetermined goals but it moderated the relationship between resistance and user satisfaction. In addition, change management initiatives have a direct positive impact on user satisfaction. This research concludes that the human factor is very important in ERP's implementation.

  11. Guide to safe work : fatigue management : an employer's guide to designing and implementing a fatigue management program. 2 ed.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-02-15

    The impacts of fatigue on workplace safety are now commonly recognized. Many employers now wish to include fatigue management as part of their overall health and safety programs. This guide to fatigue management was written to help companies in the petroleum industry design and implement effective fatigue management programs that reduce incidents and injuries among employees. The guide provided information about workplace fatigue and discussed fatigue management issues and strategies. It was suggested that workplace culture can play a significant role in managing fatigue by allowing fatigue factors to be quickly recognized and managed. Employers who wish to build fatigue management programs should involve all levels of employees, and should consider all workplace practices and procedures. Consideration must also be given to the development of employee competency in managing fatigue. The guide included step-by-step recommendations for implementing a fatigue management program. It was concluded that the benefits of fatigue management include reduced worker absence and turnover, as well as avoiding the costs of safety incidents. 1 tab., 1 fig.

  12. Implementation of a quality management system at the PHOENIX facility (CryoMaK)

    International Nuclear Information System (INIS)

    Urbach, Elisabeth; Bagrets, Nadezda; Weiss, Klaus-Peter

    2013-01-01

    Within a variety of mechanical tests in the Cryogenic Material Test Facility Karlsruhe (CryoMaK) at Karlsruhe Institute of Technology (KIT) the PHOENIX facility was prepared for multiple standard tensile tests in liquid helium, liquid nitrogen and at room temperature. With the multiple specimens holder 10 specimens can be tested within one cool down one after another. A quality management system is needed for ensuring reproducible preconditions. For the guarantee of the competence of the laboratory and the measurement equipment, a quality management system was implemented and prepared for accreditation according to DIN EN ISO/IEC 17025 (ISO 17025). The implementation of a quality management system allows high precision test results included the estimation of measurement uncertainty. This paper gives an overview of the management and technical requirements for the accreditation of the PHOENIX testing facility

  13. Implementation of a quality management system at the PHOENIX facility (CryoMaK)

    Energy Technology Data Exchange (ETDEWEB)

    Urbach, Elisabeth, E-mail: elisabeth.urbach@kit.edu; Bagrets, Nadezda; Weiss, Klaus-Peter

    2013-10-15

    Within a variety of mechanical tests in the Cryogenic Material Test Facility Karlsruhe (CryoMaK) at Karlsruhe Institute of Technology (KIT) the PHOENIX facility was prepared for multiple standard tensile tests in liquid helium, liquid nitrogen and at room temperature. With the multiple specimens holder 10 specimens can be tested within one cool down one after another. A quality management system is needed for ensuring reproducible preconditions. For the guarantee of the competence of the laboratory and the measurement equipment, a quality management system was implemented and prepared for accreditation according to DIN EN ISO/IEC 17025 (ISO 17025). The implementation of a quality management system allows high precision test results included the estimation of measurement uncertainty. This paper gives an overview of the management and technical requirements for the accreditation of the PHOENIX testing facility.

  14. Barriers analysis for green supply chain management implementation in Indian industries using analytic hierarchy process

    DEFF Research Database (Denmark)

    Govindan, Kannan; Kaliyan, Mathiyazhagan; Kannan, Devika

    2014-01-01

    to the implementation of a green supply chain management (Green SCM) based on procurement effectiveness. A total of 47 barriers were identified, both through detailed literature and discussion with industrial experts and through a questionnaire-based survey from various industrial sectors. Essential barriers......Manufacturing industries started adopting the green concept in their supply chain management recently to focus on environmental issues. But, industries still struggle to identify barriers hindering green supply chain management implementation. This work focuses on identifying barriers...

  15. Implementing the MOVE! weight-management program in the Veterans Health Administration, 2007-2010: a qualitative study.

    Science.gov (United States)

    Weiner, Bryan J; Haynes-Maslow, Lindsey; Kahwati, Leila C; Kinsinger, Linda S; Campbell, Marci K

    2012-01-01

    One-third of US veterans receiving care at Veterans Health Administration (VHA) medical facilities are obese and, therefore, at higher risk for developing multiple chronic diseases. To address this problem, the VHA designed and nationally disseminated an evidence-based weight-management program (MOVE!). The objective of this study was to examine the organizational factors that aided or inhibited the implementation of MOVE! in 10 VHA medical facilities. Using a multiple, holistic case study design, we conducted 68 interviews with medical center program coordinators, physicians formally appointed as program champions, managers directly responsible for overseeing the program, clinicians from the program's multidisciplinary team, and primary care physicians identified by program coordinators as local opinion leaders. Qualitative data analysis involved coding, memorandum writing, and construction of data displays. Organizational readiness for change and having an innovation champion were most consistently the 2 factors associated with MOVE! implementation. Other organizational factors, such as management support and resource availability, were barriers to implementation or exerted mixed effects on implementation. Barriers did not prevent facilities from implementing MOVE! However, they were obstacles that had to be overcome, worked around, or accepted as limits on the program's scope or scale. Policy-directed implementation of clinical weight-management programs in health care facilities is challenging, especially when no new resources are available. Instituting powerful, mutually reinforcing organizational policies and practices may be necessary for consistent, high-quality implementation.

  16. Change Management Perspectives in an ERP Module Implementation: A Case Study in a Telecommunication Company

    Directory of Open Access Journals (Sweden)

    Tota Simatupang

    2016-06-01

    Full Text Available Successful Enterprise Resource Planning (ERP projects require change management to support the integration of the ERP systems into work environment because ERP imple¬men¬tations involve lots of changes on technical infrastructures, business processes, organization structure, rules and skills of people in the organization. This study was aimed to explain the challenges in implementing an ERP module in a Indonesian telecommunication company, focusing on the change management process involves in the project. A case study at a tele¬com¬munication company was used to collect empirical data and to analyses important aspects of project arrangements that will have an impact on the change management process accompanying the ERP implementation project. The following two aspects of changes were analyzed as the impact of ERP implementation: changes in individual behaviors and changes in the organisational practices. Based on the empirical study, two important aspects of change management effectiveness in the project and post-project stage were highlighted: alignment of the organization structure to support IT-business collaboration and alignment of employee orientation towards effective use of ERP systems. Besides, this study also highlighted that it is important to plan and execute change management process in the post-project stage to obtain benefits from ERP implementation.

  17. Implementation of relational data base management systems on micro-computers

    International Nuclear Information System (INIS)

    Huang, C.L.

    1982-01-01

    This dissertation describes an implementation of a Relational Data Base Management System on a microcomputer. A specific floppy disk based hardward called TERAK is being used, and high level query interface which is similar to a subset of the SEQUEL language is provided. The system contains sub-systems such as I/O, file management, virtual memory management, query system, B-tree management, scanner, command interpreter, expression compiler, garbage collection, linked list manipulation, disk space management, etc. The software has been implemented to fulfill the following goals: (1) it is highly modularized. (2) The system is physically segmented into 16 logically independent, overlayable segments, in a way such that a minimal amount of memory is needed at execution time. (3) Virtual memory system is simulated that provides the system with seemingly unlimited memory space. (4) A language translator is applied to recognize user requests in the query language. The code generation of this translator generates compact code for the execution of UPDATE, DELETE, and QUERY commands. (5) A complete set of basic functions needed for on-line data base manipulations is provided through the use of a friendly query interface. (6) To eliminate the dependency on the environment (both software and hardware) as much as possible, so that it would be easy to transplant the system to other computers. (7) To simulate each relation as a sequential file. It is intended to be a highly efficient, single user system suited to be used by small or medium sized organizations for, say, administrative purposes. Experiments show that quite satisfying results have indeed been achieved

  18. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion of...

  19. Important, misunderstood, and challenging: a qualitative study of nurses' and allied health professionals' perceptions of implementing self-management for patients with COPD.

    Science.gov (United States)

    Young, Hannah M L; Apps, Lindsay D; Harrison, Samantha L; Johnson-Warrington, Vicki L; Hudson, Nicky; Singh, Sally J

    2015-01-01

    In light of the growing burden of COPD, there is increasing focus on the role of self-management for this population. Currently, self-management varies widely. Little is known either about nurses' and allied health professionals' (AHPs') understanding and provision of self-management in clinical practice. This study explores nurses' and AHPs' understanding and implementation of supported COPD self-management within routine clinical practice. Nurses and AHPs participated in face-to-face semistructured interviews to explore their understanding and provision of COPD self-management, as well as their perceptions of the challenges to providing such care. Purposive sampling was used to select participants from a range of professions working within primary, community, and secondary care settings. Three researchers independently analyzed each transcript using a thematic approach. A total of 14 participants were interviewed. Nurses and AHPs viewed self-management as an important aspect of COPD care, but often misunderstood what it involved, leading to variation in practice. A number of challenges to supporting self-management were identified, which related to lack of time, lack of insight regarding training needs, and assumptions regarding patients' perceived self-management abilities. Nurses and AHPs delivering self-management require clear guidance, training in the use of effective self-management skills, and education that challenges their preconceptions regarding patients. The design of health care services also needs to consider the practical barriers to COPD self-management support for the implementation of such interventions to be successful.

  20. Site-Wide Integrated Water Monitoring - Defining and Implementing Sampling Objectives to Support Site Closure - 13060

    International Nuclear Information System (INIS)

    Wilborn, Bill; Knapp, Kathryn; Farnham, Irene; Marutzky, Sam

    2013-01-01

    The Underground Test Area (UGTA) activity is responsible for assessing and evaluating the effects of the underground nuclear weapons tests on groundwater at the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), and implementing a corrective action closure strategy. The UGTA strategy is based on a combination of characterization, modeling studies, monitoring, and institutional controls (i.e., monitored natural attenuation). The closure strategy verifies through appropriate monitoring activities that contaminants of concern do not exceed the SDWA at the regulatory boundary and that adequate institutional controls are established and administered to ensure protection of the public. Other programs conducted at the NNSS supporting the environmental mission include the Routine Radiological Environmental Monitoring Program (RREMP), Waste Management, and the Infrastructure Program. Given the current programmatic and operational demands for various water-monitoring activities at the same locations, and the ever-increasing resource challenges, cooperative and collaborative approaches to conducting the work are necessary. For this reason, an integrated sampling plan is being developed by the UGTA activity to define sampling and analysis objectives, reduce duplication, eliminate unnecessary activities, and minimize costs. The sampling plan will ensure the right data sets are developed to support closure and efficient transition to long-term monitoring. The plan will include an integrated reporting mechanism for communicating results and integrating process improvements within the UGTA activity as well as between other U.S. Department of Energy (DOE) Programs. (authors)

  1. Assessing and interpreting the benefits derived from implementing and using asset management systems.

    Science.gov (United States)

    2011-06-23

    Interest in asset management has grown over the last two decades but agencies continue to be : concerned about the cost to develop and implement asset management processes. While originally : introduced as a tool for policy analysis, HERS-ST is free ...

  2. Implementing context information management in forensic casework: Minimizing contextual bias in firearms examination

    NARCIS (Netherlands)

    Mattijssen, E.J.A.T.; Kerkhoff, W.; Berger, C.E.H.; Dror, I.E.; Stoel, R.D.

    2016-01-01

    Managing context information in forensic casework aims to minimize task-irrelevant information while maximizing the task-relevant information that reaches the examiner. A design and implementation of context information management (CIM) is described for forensic firearms examination. Guided by a

  3. Summary and conclusions: Specialist Meeting on Severe Accident Management Implementation

    International Nuclear Information System (INIS)

    1995-01-01

    During the first session of this meeting, regulators, research groups, designers/owners' groups and some utilities discussed the critical decisions in SAM (Severe Accident Management), how these decisions were addressed and implemented in generic SAM guidelines, what equipment and instrumentation was used, what are the differences in national approaches, etc. During the second session, papers were presented by utility specialists that described approaches chosen for specific implementation of the generic guidelines, the difficulties encountered in the implementation process and the perceived likelihood of success of their SAM programme in dealing with severe accidents. The third and final sessions was dedicated to discussing what are the remaining uncertainties and open questions in SAM. Experts from several OECD countries presented significant perspectives on remaining open issues

  4. Self-Managed Work Teams in Nursing Homes: Implementing and Empowering Nurse Aide Teams

    Science.gov (United States)

    Yeatts, Dale E.; Cready, Cynthia; Ray, Beth; DeWitt, Amy; Queen, Courtney

    2004-01-01

    Purpose: This article describes the progress of our study to examine the advantages and costs of using self-managed nurse aide teams in nursing homes, steps that are being taken to implement such teams, and management strategies being used to manage the teams. Design and Methods: A quasi-experimental design is underway where certified nurse aide…

  5. Integrated System Health Management: Foundational Concepts, Approach, and Implementation

    Science.gov (United States)

    Figueroa, Fernando

    2009-01-01

    A sound basis to guide the community in the conception and implementation of ISHM (Integrated System Health Management) capability in operational systems was provided. The concept of "ISHM Model of a System" and a related architecture defined as a unique Data, Information, and Knowledge (DIaK) architecture were described. The ISHM architecture is independent of the typical system architecture, which is based on grouping physical elements that are assembled to make up a subsystem, and subsystems combine to form systems, etc. It was emphasized that ISHM capability needs to be implemented first at a low functional capability level (FCL), or limited ability to detect anomalies, diagnose, determine consequences, etc. As algorithms and tools to augment or improve the FCL are identified, they should be incorporated into the system. This means that the architecture, DIaK management, and software, must be modular and standards-based, in order to enable systematic augmentation of FCL (no ad-hoc modifications). A set of technologies (and tools) needed to implement ISHM were described. One essential tool is a software environment to create the ISHM Model. The software environment encapsulates DIaK, and an infrastructure to focus DIaK on determining health (detect anomalies, determine causes, determine effects, and provide integrated awareness of the system to the operator). The environment includes gateways to communicate in accordance to standards, specially the IEEE 1451.1 Standard for Smart Sensors and Actuators.

  6. Implementing Human Resources Management (HRM) within Dutch VET schools: Examining the fostering and hindering factors

    NARCIS (Netherlands)

    Runhaar, P.R.; Sanders, K.

    2013-01-01

    Vocational Education and Training (VET) Institutions face serious challenges, like the implementation of competence-based education and upcoming teacher shortages, which urge them to implement Human Resources Management policy and practices (HRM). The implementation of HRM, however, often stagnates.

  7. Leadership in Real Time : A Model of Attributes Needed by a Project Manager in ERP Implementations

    OpenAIRE

    Gunson, John; De Blasis, Jean-Paul; Neary, Mary

    2003-01-01

    The characteristics and organizational impacts of an Enterprise Resource Planning (ERP) Implementation Project requires highly professional Project Manager skills and attributes. Some may be learned or bought but the more important skills need to be part of the Project Manager's personal makeup. Coaching, mentoring and leadership skills (and beyond) help the Project Manager to take right decisions as even unknown-unknown situations arise during the implementation. This paper contributes to id...

  8. Critical Success Factor for Implementing Km in Government Human Capital Management: Case Study Badan Kepegawaian Negara

    OpenAIRE

    Cahyaningsih, Elin; Sensuse, Dana Indra

    2014-01-01

    Nowadays, knowledge management in organization became a trend strategy in order to improve organization performance. But unfortunately, it's a big challenge to implementing knowledge management in organization, because it's relatively new and not many people knew about this. This research is done in order to realize bureaucratic reform in government service improvement according to PERMENPAN No. 14 Tahun 2011 is about knowledge management (KM) implementation in government. Knowledge managemen...

  9. A Necessary Evil: The Experiences of Managers Implementing Downsizing Programmes

    Science.gov (United States)

    Noronha, Ernesto; D'Cruz, Premilla

    2006-01-01

    This paper presents the findings of a phenomenological study, which describes the experiences of human resource (HR) managers implementing a downsizing program in a steel manufacturing organization in India. Data were collected through conversational interviews. Following van Manens sententious analytic approach, the core theme of a necessary…

  10. Employee perceptions of line management performance: applying the AMO theory to explain the effectiveness of line managers' HRM implementation

    NARCIS (Netherlands)

    Bos-Nehles, Anna Christina; van Riemsdijk, Maarten; Looise, Jan C.

    2013-01-01

    Line managers are today seen as increasingly important in effectively implementing HRM practices. Based on the Ability-Motivation-Opportunity (AMO) theory, we predict that line managers' performance in this regard will depend on their ability to apply HRM practices, and that their motivation and the

  11. Operation management system evaluation in the central Finland health care district - end users' view of system implementation.

    Science.gov (United States)

    Lemmetty, Kaisa; Häyrinen, Eija

    2005-01-01

    In this paper we evaluate the implementation of the operation management system in the Central Finland Health Care District. The implementation of the operation management system changed the practice of operation management for the surgical clinic and concerned 500 personnel in total. A survey was carried out to investigate the end users' views on the system's usefulness, usability and the training and user support provided. The users' possibilities to accomplish their tasks and the kind of obstacles they face in operation management were explored. The assessment revealed that more end support is needed after the system implementation, even though a generally positive attitude towards the system was manifested among the staff.

  12. A crisis management quality improvement initiative in a children's psychiatric hospital: design, implementation, and outcome.

    Science.gov (United States)

    Paccione-Dyszlewski, Margaret R; Conelea, Christine A; Heisler, Walter C; Vilardi, Jodie C; Sachs, Henry T

    2012-07-01

    Behavioral crisis management, including the use of seclusion and restraint, is the most high risk process in the psychiatric care of children and adolescents. The authors describe hospital-wide programmatic changes implemented at a children's psychiatric hospital that aimed to improve the quality of crisis management services. Pre/post quantitative and qualitative data suggest reduced restraint and seclusion use, reduced patient and staff injury related to crisis management, and increased patient satisfaction during the post-program period. Factors deemed beneficial in program implementation are discussed.

  13. Factors affecting strategic plan implementation using interpretive structural modeling (ISM).

    Science.gov (United States)

    Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba

    2018-06-11

    Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.

  14. Advancing the Use of Passive Sampling in Risk Assessment and Management of Sediments Contaminated with Hydrophobic Organic Chemicals: Results of an International Ex Situ Passive Sampling Interlaboratory Comparison.

    Science.gov (United States)

    Jonker, Michiel T O; van der Heijden, Stephan A; Adelman, Dave; Apell, Jennifer N; Burgess, Robert M; Choi, Yongju; Fernandez, Loretta A; Flavetta, Geanna M; Ghosh, Upal; Gschwend, Philip M; Hale, Sarah E; Jalalizadeh, Mehregan; Khairy, Mohammed; Lampi, Mark A; Lao, Wenjian; Lohmann, Rainer; Lydy, Michael J; Maruya, Keith A; Nutile, Samuel A; Oen, Amy M P; Rakowska, Magdalena I; Reible, Danny; Rusina, Tatsiana P; Smedes, Foppe; Wu, Yanwen

    2018-03-20

    This work presents the results of an international interlaboratory comparison on ex situ passive sampling in sediments. The main objectives were to map the state of the science in passively sampling sediments, identify sources of variability, provide recommendations and practical guidance for standardized passive sampling, and advance the use of passive sampling in regulatory decision making by increasing confidence in the use of the technique. The study was performed by a consortium of 11 laboratories and included experiments with 14 passive sampling formats on 3 sediments for 25 target chemicals (PAHs and PCBs). The resulting overall interlaboratory variability was large (a factor of ∼10), but standardization of methods halved this variability. The remaining variability was primarily due to factors not related to passive sampling itself, i.e., sediment heterogeneity and analytical chemistry. Excluding the latter source of variability, by performing all analyses in one laboratory, showed that passive sampling results can have a high precision and a very low intermethod variability (sampling, irrespective of the specific method used, is fit for implementation in risk assessment and management of contaminated sediments, provided that method setup and performance, as well as chemical analyses are quality-controlled.

  15. An ISM approach for the barrier analysis in implementing green supply chain management

    DEFF Research Database (Denmark)

    Mathiyazhagan, K.; Govindan, Kannan; NoorulHaq, A.

    2013-01-01

    As customers are becoming more environmental conscious and governments are making stricter environmental regulations, the industries need to reduce the environmental impact of their supply chain. Indian auto component manufacturing industries especially SMEs (Small and Medium Enterprises......) are focused to cleaner production by implementing Green Supply Chain Management (GSCM) in their industries. But they are struggling to implement GSCM concept. The present research analyzes the barriers for the implementation of GSCM concept which has been divided into two phases such as identification...... dominant one for the adoption of green supply chain management and this result is helpful for industries to make easier the adoption of green concept in their supply chain by removing the dominant barrier. It indicates that different Indian auto component manufacturing industries have differing barriers...

  16. Implementation and evaluation of a clinical data management programme in a primary care centre.

    LENUS (Irish Health Repository)

    Sweeney, J

    2014-11-01

    Electronic health records (EHR) support clinical management, administration, quality assurance, research, and service planning. The aim of this study was to evaluate a clinical data management programme to improve consistency, completeness and accuracy of EHR information in a large primary care centre with 10 General Practitioners (GPs). A Clinical Data Manager was appointed to implement a Data Management Strategy which involved coding consultations using ICPC-2 coding, tailored support and ongoing individualised feedback to clinicians. Over an eighteen month period there were improvements in engagement with and level of coding. Prior to implementation (August 2011) 4 of the 10 GPs engaged in regular coding and 69% of their consultation notes were coded. After 12 months, all 10 GPs and 6 nurses were ICPC-2 coding their consultations and monthly coding levels had increased to 98%. This structured Data Management Strategy provides a feasible sustainable way to improve information management in primary care.

  17. Community implementation dynamics: Nutrient management in the New York City and Chesapeake Bay Watersheds

    Directory of Open Access Journals (Sweden)

    Glenn Earl Sterner

    2015-04-01

    Full Text Available The creation of natural resource management and conservation strategies can be affected by engagement with local citizens and competing interests between agencies and stakeholders at the varying levels of governance. This paper examines the role of local engagement and the interaction between governance levels on the outcomes of nutrient management policy, a specific area of natural resource conservation and management. Presented are two case studies of the New York City and Chesapeake Bay Watersheds in the US. These case studies touch upon the themes of local citizen engagement and governance stakeholder interaction in changing nutrient management to improve water quality. An analysis of these cases leads to several key considerations for the creation and implementation of nutrient management and natural resource management more broadly, including the importance of: local citizen engagement, government brokering and cost sharing; and the need of all stakeholders to respect each other in the policy creation and implementation process.

  18. [DOE method for evaluating environmental and waste management samples: Revision 1, Addendum 1

    Energy Technology Data Exchange (ETDEWEB)

    Goheen, S.C.

    1995-04-01

    The US Dapartment of Energy`s (DOE`s) environmental and waste management (EM) sampling and analysis activities require that large numbers of samples be analyzed for materials characterization, environmental surveillance, and site-remediation programs. The present document, DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods), is a supplemental resource for analyzing many of these samples.

  19. [DOE method for evaluating environmental and waste management samples: Revision 1, Addendum 1

    International Nuclear Information System (INIS)

    Goheen, S.C.

    1995-04-01

    The US Dapartment of Energy's (DOE's) environmental and waste management (EM) sampling and analysis activities require that large numbers of samples be analyzed for materials characterization, environmental surveillance, and site-remediation programs. The present document, DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods), is a supplemental resource for analyzing many of these samples

  20. Implementing knowledge management in BNFL - A case study

    International Nuclear Information System (INIS)

    Grant, G.E.

    2004-01-01

    This paper describes the work that has been done within BNFL Environmental Services over the past 18 months to develop and implement a Knowledge Management framework within the business. The paper provides an overview of the approach used, lessons learnt and achievements to date. The conclusion is that the approach has delivered a framework that is scaleable and repeatable in alignment with the business strategy and that the required change in behaviour has started. The BNFL Environmental Services KM Team is now focussing its efforts on revising the framework for application in the new British Nuclear Group Project Services business. The short term goals are to embed Knowledge Management in business processes and to facilitate the creation of dynamic communities that will support the formation of the new business. (author)

  1. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  2. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  3. Development and implementation of the Dutch protocol for rehabilitative management in amyotrophic lateral sclerosis.

    Science.gov (United States)

    van den Berg, J P; de Groot, I J M; Joha, B C; van Haelst, J M; van Gorcom, P; Kalmijn, S

    2004-12-01

    In the Netherlands, rehabilitation care plays an important role in the symptomatic and palliative treatment of ALS patients. However, until 1999 there were no guidelines or practice parameters available for the management of ALS. Therefore, the Dutch protocol for rehabilitative management in ALS was developed. We describe the development process, the outcome and implementation of the protocol. A concept management protocol was written and the Delphi method was selected to develop the protocol further. This method comprises repetitive discussion sessions from postulates, using a combination of written questionnaires and work-conferences. Between 80 and 90 persons (rehabilitation team members of different professional backgrounds and neurologists) were involved in this process. The protocol was implemented by sending it to all consultants in rehabilitation medicine in the Netherlands; they were asked to inform all the treatment team members about the final protocol and to implement it in their treatment of ALS patients. The protocol was developed in 1999, implemented in 2000 and evaluated in 2001. Recommendations for improvement were made during the evaluation and improvements are currently being developed by an expert group. The protocol is widely used (88.9%) by consultants in rehabilitation medicine and their treatment teams in the Netherlands. The Dutch protocol for rehabilitative management was developed to provide an optimal and adequate care plan for patients with ALS. It is widely used in the Netherlands.

  4. [Investigation of doctors' and nurses' perceptions and implementation of delirium management in intensive care unit].

    Science.gov (United States)

    Luo, H B; Wang, X T; Tang, B; Zhu, Z N; Guo, H L; Li, Z Z; Sun, J H; Liu, D W

    2017-12-01

    Objective: To investigate doctors' and nurses' perceptions and implementation of delirium management in intensive care unit. Methods: A total of 197 doctors and nurses in 2 general ICUs and 3 special ICUs at Peking Union Medical College Hospital finished a self-designed questionnaire of delirium management. Results: There were 47 males and 150 females, 43 doctors and 154 nurses who participated in the survey.One hundred and twenty five participators were from general ICU and the others from special ICU. The ICU staff had a significant difference on the perceptions and implementation of delirium management( P delirium assessment" ( P delirium management,especially in special ICUs. Delirium management should be included as a routine care in ICU to improve patients' outcome.

  5. [Implementation and evaluation of case management in Catalonia: the ISP-SMD program].

    Science.gov (United States)

    Balsera Gómez, J; Rodríguez Medina, C; Caba Calvet, R; Vega Prada, R; Ruiz Ureña, H; Berruezo Ortiz, L; Clusa Gironella, D; Rodríguez Montes, M J; Haro Abad, J M

    2002-01-01

    The pilot study of the Individualized Service Program for people with Severe Mental Disorders (ISP-SMD) consists of the implementation of case management services in Catalonia. The ISP-SMD has been implemented in two health care sectors and will be expanded to the rest of Catalonia in the next years. The program serves people with persistent mental disorders who have serious social or family problems and/or who have inadequate mental health service use (high use of inpatient services, no use of community services). The ISP-SMD is a community intervention program that focuses its activities on direct care and coordination between services. Thirty patients have been included in the evaluation. The results of the pilot study have shown that, compared to the year before entering the program, the patients show better clinical status, they decrease their unmet need level, they have more appropriate use of health services and have lower treatment costs. Satisfaction of the patients, family members and professionals with the program is very high. It is possible to adapt and implement case management services in Catalonia. When implemented, they improve patient quality of life.

  6. Emergency Department Pain Management Following Implementation of a Geriatric Hip Fracture Program

    Directory of Open Access Journals (Sweden)

    Scott D. Casey

    2017-04-01

    Full Text Available Introduction: Over 300,000 patients in the United States sustain low-trauma fragility hip fractures annually. Multidisciplinary geriatric fracture programs (GFP including early, multimodal pain management reduce morbidity and mortality. Our overall goal was to determine the effects of a GFP on the emergency department (ED pain management of geriatric fragility hip fractures. Methods: We performed a retrospective study including patients age ≥65 years with fragility hip fractures two years before and two years after the implementation of the GFP. Outcomes were time to (any first analgesic, use of acetaminophen and fascia iliaca compartment block (FICB in the ED, and amount of opioid medication administered in the first 24 hours. We used permutation tests to evaluate differences in ED pain management following GFP implementation. Results: We studied 131 patients in the pre-GFP period and 177 patients in the post-GFP period. In the post-GFP period, more patients received FICB (6% vs. 60%; difference 54%, 95% confidence interval [CI] 45–63%; p<0.001 and acetaminophen (10% vs. 51%; difference 41%, 95% CI 32–51%; p<0.001 in the ED. Patients in the post-GFP period also had a shorter time to first analgesic (103 vs. 93 minutes; p=0.04 and received fewer morphine equivalents in the first 24 hours (15mg vs. 10mg, p<0.001 than patients in the pre-GFP period. Conclusion: Implementation of a GFP was associated with improved ED pain management for geriatric patients with fragility hip fractures. Future studies should evaluate the effects of these changes in pain management on longer-term outcomes.

  7. Implementation of customer relationship management and its advantages : Case company Forchem Oy

    OpenAIRE

    Puiseva, Maiju

    2014-01-01

    The purpose of this thesis was to bring out the key issues of the concept of customer relationship management and study its implementation and advantages in the case company. The topic of the thesis was assigned by the case company. Their objective was to understand customer relationship management better and to develop it to be one of the business processes. Theoretical part of the thesis studied customer service and customer relationship management and the importance of those. Theoretica...

  8. School Age Center Connections: Site-Based Management Strategies for Implementation of Quality Programs.

    Science.gov (United States)

    Willis, Dahna R.

    This paper describes the outcomes of a practicum that initiated site-based-management strategies to support the consistent implementation of a quality school-age child-care program. Implemented at a multisite child-care center, the program sought to enhance staff members' job satisfaction and maximize their opportunities for professional growth…

  9. Implementing an Open Source Learning Management System: A Critical Analysis of Change Strategies

    Science.gov (United States)

    Uys, Philip M.

    2010-01-01

    This paper analyses the change and innovation strategies that Charles Sturt University (CSU) used from 2007 to 2009 during the implementation and mainstreaming of an open source learning management system (LMS), Sakai, named locally as "CSU Interact". CSU was in January 2008 the first Australian University to implement an open source…

  10. Proceedings of the specialist meeting on severe accident management implementation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Niantic Specialist meeting was structured around three main themes, one for each session. During the first session, papers from regulators, research groups, designers/owners groups and some utilities discussed the critical decisions in Severe Accident Management (SAM), how these decisions were addressed and implemented in generic SAM guidelines, what equipment and instrumentation was used, what are the differences in national approaches, etc. During the second session, papers were presented by utility specialists that described approaches chosen to specific implementation of the generic guidelines, the difficulties encountered in the implementation process and the perceived likelihood of success of their SAM program in dealing with severe accidents. The third session was dedicated to discussing what are the remaining uncertainties and open questions in SAM. Experts from several OECD countries presented significant perspectives on remaining open issues

  11. Proceedings of the specialist meeting on severe accident management implementation

    International Nuclear Information System (INIS)

    1995-01-01

    The Niantic Specialist meeting was structured around three main themes, one for each session. During the first session, papers from regulators, research groups, designers/owners groups and some utilities discussed the critical decisions in Severe Accident Management (SAM), how these decisions were addressed and implemented in generic SAM guidelines, what equipment and instrumentation was used, what are the differences in national approaches, etc. During the second session, papers were presented by utility specialists that described approaches chosen to specific implementation of the generic guidelines, the difficulties encountered in the implementation process and the perceived likelihood of success of their SAM program in dealing with severe accidents. The third session was dedicated to discussing what are the remaining uncertainties and open questions in SAM. Experts from several OECD countries presented significant perspectives on remaining open issues

  12. Identifying concepts for studying implementation of information technology in facilities management

    DEFF Research Database (Denmark)

    Ebbesen, Poul; Bonke, Sten

    2014-01-01

    . Background: Experiences from the FM sector indicate that IT systems meant to support FM operations and workflows often do not generate the expected added value neither to the FM department itself nor to the basic organization supported by the FM department. Approach (Theory/Methodology): Based on findings......Purpose: To contribute to identifying a conceptual framework for describing and understanding the processes involved when implementing and using Information Technology (IT) in Facilities Management (FM). This paper discusses how basic concepts from different theories can be applied in parallel when...... from exciting research on IT implementation a range of more generic theoretical concepts applicable to the typical setting or situation of IT implementation in FM has been found. These theoretical concepts all clarify and describe different aspects of the implementation process and they may all...

  13. OSIRIS-REx Contamination Control Strategy and Implementation

    Science.gov (United States)

    Dworkin, J. P.; Adelman, L. A.; Ajluni, T.; Andronikov, A. V.; Aponte, J. C.; Bartels, A. E.; Beshore, E.; Bierhaus, E. B.; Brucato, J. R.; Bryan, B. H.; Burton, A. S.; Callahan, M. P.; Castro-Wallace, S. L.; Clark, B. C.; Clemett, S. J.; Connolly, H. C.; Cutlip, W. E.; Daly, S. M.; Elliott, V. E.; Elsila, J. E.; Enos, H. L.; Everett, D. F.; Franchi, I. A.; Glavin, D. P.; Graham, H. V.; Hendershot, J. E.; Harris, J. W.; Hill, S. L.; Hildebrand, A. R.; Jayne, G. O.; Jenkens, R. W.; Johnson, K. S.; Kirsch, J. S.; Lauretta, D. S.; Lewis, A. S.; Loiacono, J. J.; Lorentson, C. C.; Marshall, J. R.; Martin, M. G.; Matthias, L. L.; McLain, H. L.; Messenger, S. R.; Mink, R. G.; Moore, J. L.; Nakamura-Messenger, K.; Nuth, J. A.; Owens, C. V.; Parish, C. L.; Perkins, B. D.; Pryzby, M. S.; Reigle, C. A.; Righter, K.; Rizk, B.; Russell, J. F.; Sandford, S. A.; Schepis, J. P.; Songer, J.; Sovinski, M. F.; Stahl, S. E.; Thomas-Keprta, K.; Vellinga, J. M.; Walker, M. S.

    2018-02-01

    OSIRIS-REx will return pristine samples of carbonaceous asteroid Bennu. This article describes how pristine was defined based on expectations of Bennu and on a realistic understanding of what is achievable with a constrained schedule and budget, and how that definition flowed to requirements and implementation. To return a pristine sample, the OSIRIS-REx spacecraft sampling hardware was maintained at level 100 A/2 and scientists, engineers, managers, and technicians.

  14. Implementing Model-Check for Employee and Management Satisfaction

    Science.gov (United States)

    Jones, Corey; LaPha, Steven

    2013-01-01

    This presentation will discuss methods to which ModelCheck can be implemented to not only improve model quality, but also satisfy both employees and management through different sets of quality checks. This approach allows a standard set of modeling practices to be upheld throughout a company, with minimal interaction required by the end user. The presenter will demonstrate how to create multiple ModelCheck standards, preventing users from evading the system, and how it can improve the quality of drawings and models.

  15. Exploring physiotherapists' experiences of implementing a cognitive behavioural approach for managing low back pain and identifying barriers to long-term implementation.

    Science.gov (United States)

    Richmond, Helen; Hall, Amanda M; Hansen, Zara; Williamson, Esther; Davies, David; Lamb, Sarah E

    2018-03-01

    Our objectives were two-fold: (i) to describe physiotherapists' experiences of implementing a cognitive behavioural approach (CBA) for managing low back pain (LBP) after completing an extensive online training course (iBeST), and (ii) to identify how iBeST could be enhanced to support long-term implementation before scale up for widespread use. We conducted semi-structured interviews with 11 physiotherapists from six National Health Service departments in the Midlands, Oxfordshire and Derbyshire. Questions centred on (i) using iBeST to support implementation, (ii) what barriers they encountered to implementation and (iii) what of information or resources they required to support sustained implementation. Interviews were transcribed and thematically analysed using NVivo. Themes were categorised using the Theoretical Domains Framework (TDF). Evidence-based techniques were identified using the behaviour change technique taxonomy to target relevant TDF domains. Three themes emerged from interviews: anxieties about using a CBA, experiences of implementing a CBA, and sustainability for future implementation of a CBA. Themes crossed multiple TDF domains and indicated concerns with knowledge, beliefs about capabilities and consequences, social and professional roles, social influences, emotion, and environmental context and resources. We identified evidence-based strategies that may support sustainable implementation of a CBA for LBP in a physiotherapy setting. This study highlighted potential challenges for physiotherapists in the provision of evidence-based LBP care within the current UK NHS. Using the TDF provided the foundation to develop a tailored, evidence-based, implementation intervention to support long term use of a CBA by physiotherapists managing LBP within UK NHS outpatient departments. Copyright © 2017 Chartered Society of Physiotherapy. All rights reserved.

  16. Understanding influential factors on implementing green supply chain management practices: An interpretive structural modelling analysis.

    Science.gov (United States)

    Agi, Maher A N; Nishant, Rohit

    2017-03-01

    In this study, we establish a set of 19 influential factors on the implementation of Green Supply Chain Management (GSCM) practices and analyse the interaction between these factors and their effect on the implementation of GSCM practices using the Interpretive Structural Modelling (ISM) method and the "Matrice d'Impacts Croisés Multiplication Appliquée à un Classement" (MICMAC) analysis on data compiled from interviews with supply chain (SC) executives based in the Gulf countries (Middle East region). The study reveals a strong influence and driving power of the nature of the relationships between SC partners on the implementation of GSCM practices. We especially found that dependence, trust, and durability of the relationship with SC partners have a very high influence. In addition, the size of the company, the top management commitment, the implementation of quality management and the employees training and education exert a critical influence on the implementation of GSCM practices. Contextual elements such as the industry sector and region and their effect on the prominence of specific factors are also highlighted through our study. Finally, implications for research and practice are discussed. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Teachers' Reported Knowledge and Implementation of Research-Based Classroom and Behavior Management Strategies

    Science.gov (United States)

    Moore, Tara C.; Wehby, Joseph H.; Oliver, Regina M.; Chow, Jason C.; Gordon, Jason R.; Mahany, Laura A.

    2017-01-01

    Teachers' reported knowledge about and implementation of research-based classroom and behavior management strategies were examined. A total of 160 elementary teachers from two districts in different regions of the same state completed the researcher-developed "Survey of Classroom and Behavior Management." On average, teachers reported to…

  18. Implementing Human Resources Management (HRM) within Dutch VET Institutions: Examining the Fostering and Hindering Factors

    Science.gov (United States)

    Runhaar, Piety; Sanders, Karin

    2013-01-01

    Vocational Education and Training (VET) Institutions face serious challenges, like the implementation of competence-based education and upcoming teacher shortages, which urge them to implement Human Resources Management policy and practices (HRM). The implementation of HRM, however, often stagnates. This paper describes a qualitative study--in…

  19. A systematic review of instruments that assess the implementation of hospital quality management systems.

    NARCIS (Netherlands)

    Groene, O.; Botje, D.; Suñol, R.; Lopez, M.A.; Wagner, C.

    2013-01-01

    Purpose: Health-care providers invest substantial resources to establish and implement hospital quality management systems. Nevertheless, few tools are available to assess implementation efforts and their effect on quality and safety outcomes. This review aims to (i) identify instruments to assess

  20. Bridge management system for the Western Cape provincial government, South Africa: implementation and utilization

    CSIR Research Space (South Africa)

    Nell, AJ

    2008-10-01

    Full Text Available This paper describes the implementation and utilization of the bridge management system (BMS) of the Department of Transport and Public Works of the Western Cape Provincial Government. The implementation of the BMS as well as the visual assessment...

  1. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial... Quality Management District (AVAQMD) and Imperial County Air Pollution Control District (ICAPCD) portions... Technology (RACT),'' adopted on February 23, 2010. * * * * * (G) Antelope Valley Air Quality Management...

  2. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-30

    ...] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of...

  3. 78 FR 45114 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-07-26

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... the Antelope Valley Air Quality Management District (AVAQMD) portion of the California State... for the South Coast Air Quality Management District (SCAQMD). The Antelope Valley Air Pollution...

  4. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  5. Factors influencing the implementation of integrated management of childhood illness (IMCI) by healthcare workers at public health centers & dispensaries in Mwanza, Tanzania.

    Science.gov (United States)

    Kiplagat, Augustine; Musto, Richard; Mwizamholya, Damas; Morona, Domenica

    2014-03-25

    Integrated Management of Childhood Illness (IMCI) was developed by the World Health Organization (WHO) and the United Nations International Children's Fund (UNICEF) and aims at reducing childhood morbidity and mortality in resource-limited settings including Tanzania. It was introduced in 1996 and has been scaled up in all districts in the country. The purpose of this study was to identify factors influencing the implementation of IMCI in the health facilities in Mwanza, Tanzania since reports indicates that the guidelines are not full adhered to by the healthcare workers. A cross-sectional study design was used and a sample size of 95 healthcare workers drawn from health centers and dispensaries within Mwanza city were interviewed using self-administered questionnaires. Structured interview was also used to get views from the city IMCI focal person and the 2 facilitators. Data were analyzed using SPSS and presented using figures and tables. Only 51% of healthcare workers interviewed had been trained. 69% of trained Healthcare workers expressed understanding of the IMCI approach. Most of the respondents (77%) had a positive attitude that IMCI approach was a better approach in managing common childhood illnesses especially with the reality of resource constraint in the health facilities. The main challenges identified in the implementation of IMCI are low initial training coverage among health care workers, lack of essential drugs and supplies, lack of onsite mentoring and lack of refresher courses and regular supportive supervision. Supporting the healthcare workers through training, onsite mentoring, supportive supervision and strengthening the healthcare system through increasing access to essential medicines, vaccines, strengthening supply chain management, increasing healthcare financing, improving leadership & management were the major interventions that could assist in IMCI implementation. The healthcare workers can implement better IMCI through the

  6. Anthropological perspectives on money management: considerations for the design and implementation of interventions for substance abuse.

    Science.gov (United States)

    Carpenter-Song, Elizabeth

    2012-01-01

    There remains a long-standing argument regarding the need for money management strategies to control poor spending habits among people with substance use disorders. The objective was to review issues relevant to the design and implementation of money-management-based interventions for substance abuse. Using a comparative, cross-cultural framework of anthropology, this manuscript examines three challenges for the design and implementation of money management interventions for substance abuse: (i) clients may not trust mental health centers to manage their money, (ii) clients may have different economic perspectives from clinicians and researchers, and (iii) clients may obtain substances through informal networks of exchange. This article clarifies the inherently complex symbolic and social dimensions of money and addiction and illustrates the need for researchers and clinicians to be mindful of the cultural assumptions that underlie money management interventions for substance abuse. Using an anthropological approach toward understanding the issues surrounding money management for individuals struggling with addiction and mental illness has the potential to strengthen the design and implementation of money-management-based interventions in a manner that is acceptable and meaningful for this target population.

  7. Getting SaaSy: The Implementation of Magazine Manager at Canada Wide Media

    OpenAIRE

    Fleischmann, Ariane Louise

    2015-01-01

    In 2013, Canada Wide Media (Canada Wide), a regional magazine publisher based out of Vancouver, BC, upgraded its Customer Relationship Management (CRM) from outdated proprietary software – Media Services Group – to a Software-as-a-service (SaaS) vendor – Magazine Manager. Its implementation was considered a failure (by 2014 Canada Wide scrapped Magazine Manager in favour of Media Services Group’s later CRM iteration, Élan) and this report seeks to answer why. Through an examination of Canada ...

  8. DOE methods for evaluating environmental and waste management samples

    Energy Technology Data Exchange (ETDEWEB)

    Goheen, S.C.; McCulloch, M.; Thomas, B.L.; Riley, R.G.; Sklarew, D.S.; Mong, G.M.; Fadeff, S.K. [eds.

    1994-10-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) is a resource intended to support sampling and analytical activities for the evaluation of environmental and waste management samples from U.S. Department of Energy (DOE) sites. DOE Methods is the result of extensive cooperation from all DOE analytical laboratories. All of these laboratories have contributed key information and provided technical reviews as well as significant moral support leading to the success of this document. DOE Methods is designed to encompass methods for collecting representative samples and for determining the radioisotope activity and organic and inorganic composition of a sample. These determinations will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the U.S. Environmental Protection Agency, or others. The development of DOE Methods is supported by the Analytical Services Division of DOE. Unique methods or methods consolidated from similar procedures in the DOE Procedures Database are selected for potential inclusion in this document. Initial selection is based largely on DOE needs and procedure applicability and completeness. Methods appearing in this document are one of two types, {open_quotes}Draft{close_quotes} or {open_quotes}Verified{close_quotes}. {open_quotes}Draft{close_quotes} methods that have been reviewed internally and show potential for eventual verification are included in this document, but they have not been reviewed externally, and their precision and bias may not be known. {open_quotes}Verified{close_quotes} methods in DOE Methods have been reviewed by volunteers from various DOE sites and private corporations. These methods have delineated measures of precision and accuracy.

  9. DOE methods for evaluating environmental and waste management samples

    International Nuclear Information System (INIS)

    Goheen, S.C.; McCulloch, M.; Thomas, B.L.; Riley, R.G.; Sklarew, D.S.; Mong, G.M.; Fadeff, S.K.

    1994-10-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) is a resource intended to support sampling and analytical activities for the evaluation of environmental and waste management samples from U.S. Department of Energy (DOE) sites. DOE Methods is the result of extensive cooperation from all DOE analytical laboratories. All of these laboratories have contributed key information and provided technical reviews as well as significant moral support leading to the success of this document. DOE Methods is designed to encompass methods for collecting representative samples and for determining the radioisotope activity and organic and inorganic composition of a sample. These determinations will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the U.S. Environmental Protection Agency, or others. The development of DOE Methods is supported by the Analytical Services Division of DOE. Unique methods or methods consolidated from similar procedures in the DOE Procedures Database are selected for potential inclusion in this document. Initial selection is based largely on DOE needs and procedure applicability and completeness. Methods appearing in this document are one of two types, open-quotes Draftclose quotes or open-quotes Verifiedclose quotes. open-quotes Draftclose quotes methods that have been reviewed internally and show potential for eventual verification are included in this document, but they have not been reviewed externally, and their precision and bias may not be known. open-quotes Verifiedclose quotes methods in DOE Methods have been reviewed by volunteers from various DOE sites and private corporations. These methods have delineated measures of precision and accuracy

  10. Nuclear Knowledge Loss Risk Management (Lessons Learned, Implementation Experiences)

    International Nuclear Information System (INIS)

    Květoňová, Romana

    2014-01-01

    In the years 2007/2008 the Knowledge Management has emerged as one of the prime concerns in our HRM system. Based on the KM best practice data gathering, surveys and analyses, the detailed concept has been proposed and implemented primarily in our nuclear production units. Main objectives: • To identify, maintain and develop the unique knowledge; • To share the critical knowledge and the best practices; • To save the organization from critical capabilities and minimize the duplication effort; • To set up the succession planning system for the knowledge holders with potential knowledge loss; • To create effective system for the knowledge record sharing and its updating; • Further implementation of KM within production division as well as extension into another divisions

  11. Implementation of the Performance Management System (PMS) in Senior Secondary Schools in Botswana: An Investigation of Senior Management Team's Expected Benefits of the PMS

    Science.gov (United States)

    Bulawa, Philip

    2012-01-01

    Different forms of the performance management system have been implemented in many countries for some years. As in other countries, in 1999 the government of Botswana took a decision to implement a performance management system (PMS) across the entire public service including schools. The government explained the purpose for which this reform was…

  12. Barriers of implementation of environmental management accounting in business practice

    Directory of Open Access Journals (Sweden)

    Petra Mísařová

    2010-01-01

    Full Text Available Environmental management accounting is a very important source of information for decision-making management of the company. In many companies there were created a detailed and dynamic system of recording and processing of data on environmental costs that companies mistakenly issued for environmental management accounting. And also today for environmental accounting in the CR it is characteristic that in organizations is not normal monitoring of the environmental costs con­si­de­red as part of an integrated system for monitoring and evaluation of material, energy and financial flows. Companies do not use a wide range of options that the environmental management accounting provides. Why do not companies introduce environmental management accounting into its information system and do not use all the opportunities that EMA provides? In practice there are many barriers that prevent full-fledged process of implementation of environmental management accounting in the information system of companies. Many barriers were identified and were therefore subjected to cluster analysis. Clusters filled by identified barriers under the rules of cluster analysis are the result of cluster analysis.

  13. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-24

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura.... SUMMARY: EPA is finalizing approval of revisions to the Antelope Valley Air Quality Management District...

  14. 77 FR 39181 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-07-02

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) AGENCY: Environmental Protection Agency (EPA... Air Quality Management District. (1) Rule 1165, ``Glass Melting Furnaces,'' amended on August 25, 2008...

  15. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Butte County Air Quality Management...

  16. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Mojave Desert Air Quality Management...

  17. 78 FR 25011 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-04-29

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  18. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District...

  19. Design and implementation of an ERP platform as practice environment for learning in Operations Management

    Directory of Open Access Journals (Sweden)

    Juan Manuel Maqueira Marín

    2017-06-01

    Full Text Available Given the increasing business use of Enterprise Resource Planning (ERP software, it is necessary to have such platforms for application in the teaching-learning process in Operations Management. However, the implementation of commercial solutions is not adequate due to its high cost and to exceed the conceptual learning function, which is the main objective of this software tool with the students of Operations Management. Due to this, in this work we present the design and implementation of an ERP platform based on Open Source software and virtualization technologies. The designed platform provides an economical and adequate solution for the conceptual teaching of ERP software through the development of practices that allows students to learn the operation of an ERP and modules such as inventory management, purchasing management or sales management, among others.

  20. Implementation of Improved Management Control of Aviation Depot Level Repairable Funds

    Science.gov (United States)

    1986-12-01

    for comparing and testing. Pf ter Drucker states that ". . . control is an ambiguous word. It means the abiliti to direct oneself and one’s work. It...Frequency 50 LIST OF REFERENCES 1. Drucker , Peter F., The Practice of Management , Harper and Brothers Publishers, 1954. 2. Terry, George R., Principles of...NAVAL POSTGRADUATE SCHOOLMonterey, California 0- 6~~VI E1B9 87THESIS I IMPLEMENTATION OF IMPROVED MANAGEMENT CONTROL OF AVIATION DEPOT LEVEL

  1. Specifics of tourism system as a basis for yield management implementation

    OpenAIRE

    Ivo Županović

    2014-01-01

    Purpose – Purpose of the paper creation is the fact that without unit measurement of profit cannot be defined efficiency of any part of the tourism sector. Implementation of yield management allows the aforementioned premise, but primarily from the marketing aspect, where the financial aspect only occurs as a consequence. Also, the purpose of this paper is to prove the connection between operating part of yield management, more precisely price differentiation and strategic level (four predomi...

  2. ON EXPERIENCE OF THE ELECTRONIC DOCUMENT MANAGEMENT SYSTEM IMPLEMENTATION IN THE MEDICAL UNIVERSITY

    Directory of Open Access Journals (Sweden)

    A. V. Semenets

    2015-05-01

    Full Text Available An importance of the application of the electronic document management to the Ukraine healthcare is shown. The electronic document management systems market overview is presented. Example of the usage of the open-source electronic document management system in the Ternopil State Medical University by I. Ya. Horbachevsky is shown. The implementation capabilities of the electronic document management system within a cloud services are shown. The electronic document management features of the Microsoft Office 365 and Google Apps For Education are compared. Some results of the usage of the Google Apps For Education inTSMUas electronic document management system are presented.

  3. Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan.

    Science.gov (United States)

    Qureshi, Muhammad Imran; Iftikhar, Mehwish; Bhatti, Mansoor Nazir; Shams, Tauqeer; Zaman, Khalid

    2013-01-01

    In recent years, inventory management is continuous challenge for all organizations not only due to heavy cost associated with inventory holding, but also it has a great deal to do with the organizations production process. Cement industry is a growing sector of Pakistan's economy which is now facing problems in capacity utilization of their plants. This study attempts to identify the key strategies for successful implementation of just-in-time (JIT) management philosophy on the cement industry of Pakistan. The study uses survey responses from four hundred operations' managers of cement industry in order to know about the advantages and benefits that cement industry have experienced by Just in time (JIT) adoption. The results show that implementing the quality, product design, inventory management, supply chain and production plans embodied through the JIT philosophy which infect enhances cement industry competitiveness in Pakistan. JIT implementation increases performance by lower level of inventory, reduced operations & inventory costs was reduced eliminates wastage from the processes and reduced unnecessary production which is a big challenge for the manufacturer who are trying to maintain the continuous flow processes. JIT implementation is a vital manufacturing strategy that reaches capacity utilization and minimizes the rate of defect in continuous flow processes. The study emphasize the need for top management commitment in order to incorporate the necessary changes that need to take place in cement industry so that JIT implementation can take place in an effective manner.

  4. What are occupational safety and health management systems and why do companies implement them?

    NARCIS (Netherlands)

    Zwetsloot, G.I.J.M.

    2014-01-01

    In company practice and in governmental legislation, it is increasingly acknowledged that occupational safety and health (OSH) management should be performed systematically and continually. Implementing an OSH Management System (OSH MS) is the major strategy to achieve this.

  5. Assessment of environmental policy implementation in solid waste management in Kathmandu, Nepal.

    Science.gov (United States)

    Dangi, Mohan B; Schoenberger, Erica; Boland, John J

    2017-06-01

    In Nepal, full-fledged environmental legislation was rare before the democratic constitution of 1990. The first law covering the environment and sustainability was the Environment Protection Act 1997. While the Solid Waste Act was introduced in 1987, the problem of solid waste management still surfaces in Kathmandu. In order to understand the bedrock of this unrelenting failure in solid waste management, the manuscript digs deeper into policy implementation by dissecting solid waste rules, environmental legislations, relevant local laws, and solid waste management practices in Kathmandu, Nepal. A very rich field study that included surveys, interviews, site visits, and literature review provided the basis for the article. The study shows that volumes of new Nepalese rules are crafted without effective enforcement of their predecessors and there is a frequent power struggle between local government bodies and central authority in implementing the codes and allocating resources in solid waste management. The study concludes that Kathmandu does not require any new instrument to address solid waste problems; instead, it needs creation of local resources, execution of local codes, and commitment from central government to allow free exercise of these policies.

  6. The Implementation of a Quality Management Standard in a Food SME: A Network Learning Perspective

    Directory of Open Access Journals (Sweden)

    Zam-Zam Abdirahman

    2013-02-01

    Full Text Available In the modern agrifood economies, the development of quality management standards is crucial, and food small and medium enterprises (SMEs usually face difficulties in implementing them. In this context, the aim of the article is two‐fold. Firstly it is to craft an original analytical framework in line with the literature on innovation networks and related learning effects specifically devoted to the study of quality management standards implementation. Secondly the objective of the article is to apply this framework to a specific food SME case in order to test it and to identify the key network learningeffects that occur during the implementation of a quality management standard, namely the ISO 22000 standard for food safety. From this research, the practical output will be to propose tools to enhance food SMEs’ innovative capacity, through an improvement of their insertion in active formal and/or informal innovation networks. These specific tools will be especially targeted towards the strengthening of learning processes between the SME and the partners involved in the implementation.

  7. Implementation of Forestry Best Management Practices on Biomass and Conventional Harvesting Operations in Virginia

    Directory of Open Access Journals (Sweden)

    Scott M. Barrett

    2016-03-01

    Full Text Available Logging residues are often utilized as a Best Management Practice (BMP for stabilizing bare soil on forest harvesting operations. As utilization of woody biomass increases, concern has developed regarding availability of residues for implementing BMPs. The Virginia Department of Forestry (VDOF inspects all logging operations in Virginia and randomly selects a portion of harvests for more intensive audits. The VDOF BMP audit process intensively evaluates implementation of BMPs in seven categories (84 specific BMPs on 240 sites per year. This research analyzed three years of audit data (2010–2012 to quantify differences in BMP implementation between biomass and conventional harvesting operations. Among 720 audited tracts, 97 were biomass harvests, with 88 occurring in the Piedmont region. Only the streamside management zone (SMZ category had significant implementation percentage differences between biomass (83.1% and conventional harvests (91.4% (p = 0.0007 in the Piedmont. Specific areas where biomass harvesting operations had lower implementation were generally not related to a lack of residues available for implementing BMPs, but rather were from a lack of appropriate SMZs, overharvesting within SMZs, or inadequate construction of roads, skid trails, and stream crossings. Existing BMP recommendations already address these areas and better implementation would have negated these issues.

  8. 76 FR 38572 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) portion of the... approving with the dates that they were adopted by the Antelope Valley Air Quality Management District...

  9. How CEOs use management information systems for strategy implementation in hospitals.

    Science.gov (United States)

    Naranjo-Gil, David; Hartmann, Frank

    2007-04-01

    Institutional and market changes seem to force hospitals across the Western world to revitalize their corporate strategies towards more cost efficiency on the one hand, and more flexibility towards customer demands on the other hand. Hospitals, however, apparently differ in the extent to which they are able to implement such strategies effectively. This paper explores whether these different levels of effectiveness depend on how hospitals' top managers' use of the available management information systems (MIS). Based on data obtained from the 218 CEOs of public hospitals in Spain, we analyze how CEOs' professional and educational backgrounds affect their use of MIS, and how the use of the MIS subsequently supports or inhibits the implementation of these strategic goals. The results indicate that CEOs with a predominant clinical background focus more on non-financial information for decision-making and prefer an interactive style of using MIS, which together support flexibility strategies. CEOs with a predominant administrative background seem more effective in establishing cost-reduction strategies, through their larger inclination to emphasize financial information in combination with a diagnostic use of the MIS. Implications for the strategic management of hospitals are outlined.

  10. Nuclear plant life cycle management implementation guide. Final report

    International Nuclear Information System (INIS)

    Sliter, G.E.; Negin, C.A.

    1998-11-01

    Nuclear power plants, as baseload suppliers of electricity, are major corporate assets. As the nuclear industry enters its fourth decade as a major producer of clean electricity, the structure of the utility industry is undergoing a historical landmark transition from economic deregulation to a competitive, market-driven industry. An integral part of competition is to manage the operation of the key asset, the plant, in the long term, thereby enhancing its long-term profitability. Life cycle management (LCM) is a well-known technical-economic decision-making process for any large industrial facility. LCM optimizes the service life of a facility and maximizes its life-cycle asset value. LCM integrates aging management (maintaining the availability of costly-to-replace components and structures) with asset management (plant valuation and investment strategies that account for economic, performance, regulatory, and environmental uncertainties). LCM involves predicting maintenance, repair, and other capital costs for a nuclear unit far into the future, as well as planning and managing strategic issues such as waste disposal, fuel storage, decommissioning, and public acceptance. This Life Cycle Management Implementation Guide introduces the reader to the LCM concept and its benefits, describes the elements and activities associated with an LCM program (most of which already exist in all plants), gives an overview of asset and aging management, and provides key references related to life cycle management for nuclear power plants. It also summarizes the major elements of life cycle management required for license renewal or, for newer plants, keeping open the option of license renewal

  11. THE EFFICIENCY OF IMPLEMENTING PRIVATE MANAGEMENT IN STATE COMPANIES

    Directory of Open Access Journals (Sweden)

    Mungiu-Pupăzan Mariana Claudia

    2012-09-01

    Full Text Available In 2012, nine state-owned companies are expected to have private management giving up the statemanagement. Therefore, a full debate of this issue is required, taking into consideration the fact that, in ouropinion, this process involves more than just the replacement of a manager with another. The implementationof private management in companies of national strategy, currently in state ownership, is desired to be aprofound and also very complex process, aiming to change organizational culture in depth, both verticallyand horizontally, so as to increase efficiency in these companies.Implementation of private management could be a good opportunity for an efficient development ofthese companies, for an increasing level of competitiveness on the international market, but only in terms ofa leadership team chosen on performance criteria, with a coherent set of objectives and a high independencelevel of decision.There are some opinions from people with experience in managing both private and statecompanies. They believe that the idea of establishing a private management in state companies, is, in themain, good, but it is essential to take into consideration the idea of a team trained to lead the company,instead of one person as a general manager.Another element to be taken into account, so that this idea of private management may have thedesired effect, is to precisely determine companies where private management teams should be installed. Notall companies are suitable for the same private management strategy. This type of leadership is better forcompanies with a real international perspective, such as Tarom, while strategic companies should be ratherreformed, including management privatization, and kept as state strategic areas. However, strict criteria ofstate intervention in decision-making process should be established, a striking question concerning thecircumstances under which such a management team could be successful, given that state firms are

  12. Implementation of a compressive sampling scheme for wireless sensors to achieve energy efficiency in a structural health monitoring system

    Science.gov (United States)

    O'Connor, Sean M.; Lynch, Jerome P.; Gilbert, Anna C.

    2013-04-01

    Wireless sensors have emerged to offer low-cost sensors with impressive functionality (e.g., data acquisition, computing, and communication) and modular installations. Such advantages enable higher nodal densities than tethered systems resulting in increased spatial resolution of the monitoring system. However, high nodal density comes at a cost as huge amounts of data are generated, weighing heavy on power sources, transmission bandwidth, and data management requirements, often making data compression necessary. The traditional compression paradigm consists of high rate (>Nyquist) uniform sampling and storage of the entire target signal followed by some desired compression scheme prior to transmission. The recently proposed compressed sensing (CS) framework combines the acquisition and compression stage together, thus removing the need for storage and operation of the full target signal prior to transmission. The effectiveness of the CS approach hinges on the presence of a sparse representation of the target signal in a known basis, similarly exploited by several traditional compressive sensing applications today (e.g., imaging, MRI). Field implementations of CS schemes in wireless SHM systems have been challenging due to the lack of commercially available sensing units capable of sampling methods (e.g., random) consistent with the compressed sensing framework, often moving evaluation of CS techniques to simulation and post-processing. The research presented here describes implementation of a CS sampling scheme to the Narada wireless sensing node and the energy efficiencies observed in the deployed sensors. Of interest in this study is the compressibility of acceleration response signals collected from a multi-girder steel-concrete composite bridge. The study shows the benefit of CS in reducing data requirements while ensuring data analysis on compressed data remain accurate.

  13. A Collaborative Knowledge Management Process for Implementing Healthcare Enterprise Information Systems

    Science.gov (United States)

    Cheng, Po-Hsun; Chen, Sao-Jie; Lai, Jin-Shin; Lai, Feipei

    This paper illustrates a feasible health informatics domain knowledge management process which helps gather useful technology information and reduce many knowledge misunderstandings among engineers who have participated in the IBM mainframe rightsizing project at National Taiwan University (NTU) Hospital. We design an asynchronously sharing mechanism to facilitate the knowledge transfer and our health informatics domain knowledge management process can be used to publish and retrieve documents dynamically. It effectively creates an acceptable discussion environment and even lessens the traditional meeting burden among development engineers. An overall description on the current software development status is presented. Then, the knowledge management implementation of health information systems is proposed.

  14. System implementation: managing project and post project stage - case study in an Indonesian company

    NARCIS (Netherlands)

    Govindaraju, Rajesri; de Bruijn, E.J.; Fisscher, O.A.M.; Laptaned, U

    2007-01-01

    The research reported in this paper aims to get a better understanding of how the implementation process of enterprise systems (ES) can be managed, by studying the process from an organisational perspective. A review of the literature on previous research in ES implementation has been carried out

  15. Knowledge Management Implementation and the Tools Utilized in Healthcare for Evidence-Based Decision Making: A Systematic Review.

    Science.gov (United States)

    Shahmoradi, Leila; Safadari, Reza; Jimma, Worku

    2017-09-01

    Healthcare is a knowledge driven process and thus knowledge management and the tools to manage knowledge in healthcare sector are gaining attention. The aim of this systematic review is to investigate knowledge management implementation and knowledge management tools used in healthcare for informed decision making. Three databases, two journals websites and Google Scholar were used as sources for the review. The key terms used to search relevant articles include: "Healthcare and Knowledge Management"; "Knowledge Management Tools in Healthcare" and "Community of Practices in healthcare". It was found that utilization of knowledge management in healthcare is encouraging. There exist numbers of opportunities for knowledge management implementation, though there are some barriers as well. Some of the opportunities that can transform healthcare are advances in health information and communication technology, clinical decision support systems, electronic health record systems, communities of practice and advanced care planning. Providing the right knowledge at the right time, i.e., at the point of decision making by implementing knowledge management in healthcare is paramount. To do so, it is very important to use appropriate tools for knowledge management and user-friendly system because it can significantly improve the quality and safety of care provided for patients both at hospital and home settings.

  16. Total Quality Management Implementation and Guest Satisfaction in Hospitality

    Directory of Open Access Journals (Sweden)

    Miroslav Knežević

    2017-02-01

    Full Text Available Total quality management (TQM has become a modern system of constant improvement of the quality of all company activities. The purpose of this study is to measure the expectations and satisfaction of the guests concerning the attribute quality of the hotel product. Furthermore obtained results were compared in such a way as to analyse particularly the reviews of hotels which have implemented TQM and have the ISO 9001 certificates with reviews from hotels which have not implemented TQM and do not have the ISO 9001 certificates. The conducted analysis included 55 hotels in Serbia belonging to the 4- and 5-star categories, i.e. 1308 guests who have stayed in them. The results show that between the observed groups of guests there are fewer differences in expectations than in perception, and that generally speaking guests who have stayed in the hotels that have implemented TQM are more satisfied. The biggest difference concerning the guest satisfaction with the quality of service in the observed hotels is noticeable in relation to the employees and the value-for-money.

  17. CONSIDERATIONS REGARDING THE IMPLEMENTATION OF A PERFORMANCE MANAGEMENT SYSTEM IN PRIVATE HOSPITALS

    Directory of Open Access Journals (Sweden)

    Marian TAICU

    2013-09-01

    Full Text Available Obtaining performance in private hospitals require a proper management of costs and implementing a situation for performance monitoring. The implementation of a cost calculation method in hospitals is a complex process that must take into account the particularities of the activity in health care system. This paper presents a comparative analysis of four costing methods and a model of performance monitoring situation, adapted to the specific of the hospitals.

  18. IMPLEMENTATION OF WORK LIFE QUALITY PROGRAMS WITH THE PROJECT MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Maria Lúcia Granja Coutinho

    2010-06-01

    Full Text Available The research studies the implementation of Quality of Working Life (QWL programs using project management techniques. Quality of Work Life projects have undergone a constant increase in scope to the point where they currently involve such diverse themes as change in dietary habits, exercise, stress management, socio environmental responsibility, and adult education. The major focus of this research is to analyze the processes and knowledge areas of project management being used to deal with this increased scope. The managerial processes identified were divided into categories of preparation, structuring, execution, and conclusion. The knowledge areas studied were: communication, risks, human resources, and acquisitions. The firms studied included mid to large sized firms located in the north, southeast and south of Brazil. We interviewed managers, directors, CEOs, plant managers, and line managers as part of this effort. The results suggest that the project management practices used were ad hoc and based on day to day needs. They also suggest that sound project management practices are applicable to QWL programs in the firms we studied.

  19. The Implementation of Performance Measurement System (PMS: Malaysian Facilities Management (FM Industry

    Directory of Open Access Journals (Sweden)

    Myeda N.E.

    2014-01-01

    Full Text Available Performance Measurement System (PMS is an effective performance measurement tool and technique that is being widely implemented in the global industries. Literature has suggested the significant contributions of its implementation in enhancing the strategic service delivery and performance. However, there is little study undertaken to explore the PMS implementation in Facilities Management (FM industry, particularly focusing on Malaysia. This study explores the PMS practice among FM practitioners and their knowledge in Performance Measurement (PM generally. Findings from this study also proposed the 20 contributing factors that the FM practitioners believed are the barriers in implementing PMS. This research also suggests the future research opportunities in developing a PMS framework that can be used as guidance for FM service delivery in Malaysia.

  20. Quality assurance programs developed and implemented by the US Department of Energy's Analytical Services Program for environmental restoration and waste management activities

    International Nuclear Information System (INIS)

    Lillian, D.; Bottrell, D.

    1993-01-01

    The U.S. Department of Energy's (DOE's) Office of Environmental Restoration and Waste Management (EM) has been tasked with addressing environmental contamination and waste problems facing the Department. A key element of any environmental restoration or waste management program is environmental data. An effective and efficient sampling and analysis program is required to generate credible environmental data. The bases for DOE's EM Analytical Services Program (ASP) are contained in the charter and commitments in Secretary of Energy Notice SEN-13-89, EM program policies and requirements, and commitments to Congress and the Office of Inspector General (IG). The Congressional commitment by DOE to develop and implement an ASP was in response to concerns raised by the Chairman of the Congressional Environment, Energy, and Natural Resources Subcommittee, and the Chairman of the Congressional Oversight and Investigations Subcommittee of the Committee on Energy and Commerce, regarding the production of analytical data. The development and implementation of an ASP also satisfies the IG's audit report recommendations on environmental analytical support, including development and implementation of a national strategy for acquisition of quality sampling and analytical services. These recommendations were endorsed in Departmental positions, which further emphasize the importance of the ASP to EM's programs. In September 1990, EM formed the Laboratory Management Division (LMD) in the Office of Technology Development to provide the programmatic direction needed to establish and operate an EM-wide ASP program. In January 1992, LMD issued the open-quotes Analytical Services Program Five-Year Plan.close quotes This document described LMD's strategy to ensure the production of timely, cost-effective, and credible environmental data. This presentation describes the overall LMD Analytical Services Program and, specifically, the various QA programs

  1. Sample Management System for Heavy Ion Irradiation, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — A robotic sample management device and system for the exposure of biological and material specimens to heavy ion beams of the NASA Space Radiation Laboratory (NSRL)...

  2. Sample Management System for Heavy Ion Irradiation, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — A robotic sample management device and system for the exposure of biological and material specimens to heavy ion beams of the NASA Space Radiation Laboratory (NSRL)...

  3. Evaluation of an electronic health record-supported obesity management protocol implemented in a community health center: a cautionary note.

    Science.gov (United States)

    Steglitz, Jeremy; Sommers, Mary; Talen, Mary R; Thornton, Louise K; Spring, Bonnie

    2015-07-01

    Primary care clinicians are well-positioned to intervene in the obesity epidemic. We studied whether implementation of an obesity intake protocol and electronic health record (EHR) form to guide behavior modification would facilitate identification and management of adult obesity in a Federally Qualified Health Center serving low-income, Hispanic patients. In three studies, we examined clinician and patient outcomes before and after the addition of the weight management protocol and form. In the Clinician Study, 12 clinicians self-reported obesity management practices. In the Population Study, BMI and order data from 5000 patients and all 40 clinicians in the practice were extracted from the EHR preintervention and postintervention. In the Exposure Study, EHR-documented outcomes for a sub-sample of 46 patients actually exposed to the obesity management form were compared to matched controls. Clinicians reported that the intake protocol and form increased their performance of obesity-related assessments and their confidence in managing obesity. However, no improvement in obesity management practices or patient weight-loss was evident in EHR records for the overall clinic population. Further analysis revealed that only 55 patients were exposed to the form. Exposed patients were twice as likely to receive weight-loss counseling following the intervention, as compared to before, and more likely than matched controls. However, their obesity outcomes did not differ. Results suggest that an obesity intake protocol and EHR-based weight management form may facilitate clinician weight-loss counseling among those exposed to the form. Significant implementation barriers can limit exposure, however, and need to be addressed. © The Author 2015. Published by Oxford University Press on behalf of the American Medical Informatics Association. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  4. Importance of strategic management in the implementation of private medicine retailer programmes: case studies from three districts in Kenya

    Directory of Open Access Journals (Sweden)

    Marsh Vicki

    2010-07-01

    Full Text Available Abstract Background The home-management of malaria strategy seeks to improve prompt and effective anti-malarial drug use through the informal sector, with a potential channel being the Private Medicine Retailers (PMRs. Previous evaluations of PMR programmes focused on their impact on retailer knowledge and practices, with limited evidence about the influence of implementation processes on the impacts at scale. This paper examines how the implementation processes of three PMR programmes in Kenya, each scaled up within a district, contributed to the outcomes observed. These were a Ministry of Health programme in Kwale district; and two programmes supported by non-governmental organizations in collaboration with government in Kisii Central and Bungoma districts. Methods The research methods included 24 focus group discussions with clients and PMRs, 19 in-depth interviews with implementing actors, document review and a diary of events. The data were analysed using the combination of a broad policy analysis framework and more specific scaling up/diffusion of innovations frameworks. Results The Kisii programme, a case study of successful implementation, was underpinned by good relationships between district health managers and a “resource team”, supported by a memorandum of understanding which enabled successful implementation. It had flexible budgetary and decision making processes which were responsive to local contexts, and took account of local socio-economic activities. In contrast, the Kwale programme, which had implementation challenges, was characterised by a complex funding process, with lengthy timelines, that was tied to the government financial management system which constrained implementation Although there was a flexible funding system in Bungoma, a perceived lack of transparency in fund management, inadequate management of inter-organisational relationships, and inability to adapt and respond to changing circumstances led to

  5. Importance of strategic management in the implementation of private medicine retailer programmes: case studies from three districts in Kenya.

    Science.gov (United States)

    Abuya, Timothy; Amin, Abdinasir; Molyneux, Sassy; Akhwale, Willis; Marsh, Vicki; Gilson, Lucy

    2010-07-02

    The home-management of malaria strategy seeks to improve prompt and effective anti-malarial drug use through the informal sector, with a potential channel being the Private Medicine Retailers (PMRs). Previous evaluations of PMR programmes focused on their impact on retailer knowledge and practices, with limited evidence about the influence of implementation processes on the impacts at scale. This paper examines how the implementation processes of three PMR programmes in Kenya, each scaled up within a district, contributed to the outcomes observed. These were a Ministry of Health programme in Kwale district; and two programmes supported by non-governmental organizations in collaboration with government in Kisii Central and Bungoma districts. The research methods included 24 focus group discussions with clients and PMRs, 19 in-depth interviews with implementing actors, document review and a diary of events. The data were analysed using the combination of a broad policy analysis framework and more specific scaling up/diffusion of innovations frameworks. The Kisii programme, a case study of successful implementation, was underpinned by good relationships between district health managers and a "resource team", supported by a memorandum of understanding which enabled successful implementation. It had flexible budgetary and decision making processes which were responsive to local contexts, and took account of local socio-economic activities. In contrast, the Kwale programme, which had implementation challenges, was characterised by a complex funding process, with lengthy timelines, that was tied to the government financial management system which constrained implementation Although there was a flexible funding system in Bungoma, a perceived lack of transparency in fund management, inadequate management of inter-organisational relationships, and inability to adapt and respond to changing circumstances led to implementation difficulties. For effective scaling up of PMR

  6. Implementation of the environment management system within SC Aedificia Carpati S.A

    Energy Technology Data Exchange (ETDEWEB)

    Tanislav, A.; Rizea, D. [S.C Aedificia Carpati S.A, Bucharest (Romania)

    2000-07-01

    The implementation process followed by S.C Aedificia Carpati S.A for the Environment Management System (EMS) was explained. It took into account the requirements of sustainable development and environmental protection. Established in 1992, the company is active in the fields of monument restoration and the production of aluminium furnishings, marble, stone, wood processing, pre-cast concrete and concrete production. The implementation of EMS was based on aspects of: (1) human, physical and financial resources, (2) EMS alignment and integration, (3) consciousness and motivation of the environment protection, (4)knowledge, skills and training, (5) operational management, (6) preparation and reaction to critical situations, and (7) practical aspects regarding EMS within the company. The company practices wastes recycling of marble, plywood floors, walls and other demolition partitions and light concrete.

  7. Implementing the 2012 North American Waterfowl Management Plan revision: Populations, habitat, and people

    Science.gov (United States)

    Humburg, Dale D.; Anderson, Michael G.; Brasher, Michael G.; Carter, Michael F.; Eadie, John M.; Fulton, David C.; Johnson, Fred A.; Runge, Michael C.; Vrtiska, Mark P.

    2018-01-01

    The North American Waterfowl Management Plan (NAWMP) has established a model for wildlife conservation planning over the last 3 decades. Management at a continental scale, leveraged funding, regional partnerships, and a strong science basis have been notable features. Periodic updates to the NAWMP occurred since implementation in 1986; however, a fundamental revision was accomplished in 2012 after extensive stakeholder engagement. An explicit fundamental goal for waterfowl conservation supporters was added in 2012, complementing existing goals for sustainable populations and sufficient habitat found in previous updates. We present a synopsis of progress toward implementation of the 2012 NAWMP and challenge the waterfowl management community to continue with meaningful steps toward achieving NAWMP goals. Adding goals and objectives for supporters increases potential relevance of NAWMP; however, it also presents a level of complexity that was not entirely anticipated. Additionally, the 2012 NAWMP recognized that traditional support from waterfowl hunters alone will not be sufficient to support waterfowl conservation in the future. Simultaneous consideration of multiple objectives, although implicit before, now is a specific focus for habitat and harvest management affecting hunters and other users of the waterfowl resource. The waterfowl management community is faced with revisiting objectives and management actions related to harvest regulations, landscape priorities, habitat conservation, and public engagement to garner broader support. These persistent management challenges are tangible and relevant candidates for greater integration. Ultimately, the structures and processes supporting waterfowl management also will need to be reconsidered.

  8. Knowledge Management Implementation at the Women’s Branch of the Institute of Public Administration in Saudi Arabia: A Proposed Model

    Directory of Open Access Journals (Sweden)

    Eiman Saud Abokhodiar

    2014-05-01

    Full Text Available This article aims to introduce a proposed model of knowledge management implementation at the Women’s Branch of the Institute of Public Administration (WIPA. The model was built after a review and analysis of literature related to knowledge management implementation in higher education institutions. The research includes three sections. The first section deals with a theoretical framework of knowledge management, including a knowledge management definition, components of knowledge management systems, an academic knowledge framework, an organizational knowledge framework, and processes of knowledge management. The second section reviews and discusses the proposed model of knowledge management implementation at WIPA. Finally, the article concludes with a discussion of the success factors and expected barriers to the proposed model.

  9. Implementation of Mass Spectrometry for Bulk Analysis of Environmental and Nuclear Material Inspection Samples

    International Nuclear Information System (INIS)

    Bulyha, S.; Cunningham, A.; Koepf, A.; Macsik, Z.; Poths, J.

    2015-01-01

    In the frame of the ECAS project (Enhancing Capabilities of Safeguards Analytical Services) the IAEA Office of Safeguards Analytical Services has implemented the latest-generation inductively coupled plasma mass spectrometers, or ICP-MS, for (i) bulk analysis of uranium and plutonium isotopes in environmental inspection samples and (ii) impurity analyzes in uranium samples. The measurement accuracy for n(U-235)/ n(U-238) ratios has been improved by approximately five times with the new multi-collector ICP-MS equipment. Use of modern ICP-MS enabled also an improvement of instrumental detection limits for U-233 and U-236 and Pu isotopes by at least one order of magnitude in comparison to the values, which had been achieved with the previously used methods. The improved accuracy and precision for isotope ratio measurements is mainly due to the higher sensitivity and the possibility to simultaneously detect several U isotopes with a multi-collector detector block. Implementation of the ICP-MS has also demonstrated a possibility for an increased sample throughput. In parallel to the implementation of the ICP-MS, a new version of the ''modified total evaporation'' (MTE) method has been developed for isotopic analysis of uranium samples by multi-collector thermal ionization mass spectrometry (TIMS). The MTE method provides a measurement performance which is, in particular for minor uranium isotopes, by several orders of magnitude superior compared to the commonly used ''total evaporation'' method. The new mass spectrometric techniques significantly improve the capability of the IAEA safeguards laboratories to detect the presence of non-natural uranium and plutonium isotopes in environmental swipe samples and to identify previously imperceptible differences in nuclear ''signatures''. Thus, they enhance the IAEA's ability to obtain independent, timely and quality-assured safeguards-relevant data and ensure

  10. Associations among unit leadership and unit climates for implementation in acute care: a cross-sectional study.

    Science.gov (United States)

    Shuman, Clayton J; Liu, Xuefeng; Aebersold, Michelle L; Tschannen, Dana; Banaszak-Holl, Jane; Titler, Marita G

    2018-04-25

    Nurse managers have a pivotal role in fostering unit climates supportive of implementing evidence-based practices (EBPs) in care delivery. EBP leadership behaviors and competencies of nurse managers and their impact on practice climates are widely overlooked in implementation science. The purpose of this study was to examine the contributions of nurse manager EBP leadership behaviors and nurse manager EBP competencies in explaining unit climates for EBP implementation in adult medical-surgical units. A multi-site, multi-unit cross-sectional research design was used to recruit the sample of 24 nurse managers and 553 randomly selected staff nurses from 24 adult medical-surgical units from 7 acute care hospitals in the Northeast and Midwestern USA. Staff nurse perceptions of nurse manager EBP leadership behaviors and unit climates for EBP implementation were measured using the Implementation Leadership Scale and Implementation Climate Scale, respectively. EBP competencies of nurse managers were measured using the Nurse Manager EBP Competency Scale. Participants were emailed a link to an electronic questionnaire and asked to respond within 1 month. The contributions of nurse manager EBP leadership behaviors and competencies in explaining unit climates for EBP implementation were estimated using mixed-effects models controlling for nurse education and years of experience on current unit and accounting for the variability across hospitals and units. Significance level was set at α < .05. Two hundred sixty-four staff nurses and 22 nurse managers were included in the final sample, representing 22 units in 7 hospitals. Nurse manager EBP leadership behaviors (p < .001) and EBP competency (p = .008) explained 52.4% of marginal variance in unit climate for EBP implementation. Leadership behaviors uniquely explained 45.2% variance. The variance accounted for by the random intercepts for hospitals and units (p < .001) and years of nursing experience in current unit

  11. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air...: EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions of the...

  12. Exploring the Pattern of Internal Communication in Total Quality Management Implementation in Manufacturing Companies

    Directory of Open Access Journals (Sweden)

    Samsudin Sharina

    2017-01-01

    Full Text Available Communication is an important aspect of organizational dynamic process and it is irrefutable one of the critical success factors of the Total Quality Management (TQM implementation. Although there are increasing awareness concerning the importance of internal organizational communication, knowledge appears to have rarely translated into practice or there is lack of guidance to effectively practicing it. Therefore, a study was proposed to investigate the pattern of internal communication practice in TQM implementation. This paper concerns on focusing into internal communication practices in TQM implementation factors and the communication patterns in terms of message forms and mediums of communication to convey TQM messages. Reliability and Factor analysis were carried out to confirm items that form each factor in internal communication in TQM implementation. Based on the analysis of survey questionnaires distributed to 104 large manufacturing companies implementing TQM in Malaysia, it was found that there are certain communication patterns practice by the management when conveying and disseminating TQM messages, but they have no specific guidelines. Therefore, the internal communication practices are not well planned. Finally, it is suggested that further research should be carried out to explain clearly the role and strategy of communication on this issue in order to boost the success of TQM implementation particularly in manufacturing company.

  13. UF's Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP)

    OpenAIRE

    Aufmuth, Joe

    2018-01-01

    Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.

  14. CALCOM Database for managing California Commercial Groundfish sample data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The CALCOM database is used by the California Cooperative Groundfish Survey to store and manage Commercial market sample data. This data is ultimately used to...

  15. Human-centredness in customer relationship management implementation research: Towards a holistic perspective

    OpenAIRE

    Wikström, Carl-Erik; Isomäki, Hannakaisa

    2008-01-01

    The application of information technology (IT) to marketing through customer relationship management (CRM) software is growing rapidly, but the risk of failure remains high. We argue that research in CRM implementation success should focus more on human-centred issues. In this study we introduce a conceptual framework for a holistic view of humans in CRM and apply the framework to earlier research on CRM implementation. The results indicate that in most CRM approaches the prevailing conceptio...

  16. The role of managing knowledge and information in BIM implementation processes in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Nývlt Vladimír

    2018-01-01

    Full Text Available Czech construction sector is at the initial stages of implementing and assessing Building Information Management (BIM on pilot projects. Object modeling developed over the last 20 years is seemed as a stable ground for many professionals. 3D data models are basis for further concepts associated with BIM, helping to support Co-ordinated Project Information (CPI and Integrated Project Delivery (IPD. This paper presents the role of managing knowledge, information and critical success factors (CSF associated with BIM implementation within the construction industry in the Czech Republic. Determining the CSF in the context of BIM maturity levels should support BIM implementation processes within the construction industry and also within the associated bodies (education, government, technology.

  17. Implementation between Tradition and Management: Structuration and Styles of Implementation

    NARCIS (Netherlands)

    Terpstra, Jan; Havinga, Tetty

    2001-01-01

    This article presents a diachronic perspective for implementation research. It analyzes implementation practices in relation to their changing institutional context. Therefore, a comparison is made between different styles of implementation. The relationship between implementation practices and

  18. How change management can prevent the failure of information systems implementation among Malaysian government hospitals?

    Science.gov (United States)

    ChePa, Noraziah; Jasin, Noorhayati Md; Bakar, Nur Azzah Abu

    2017-10-01

    Fail to prevent or control challenges of Information System (IS) implementation have led to the failure of its implementation. Successful implementation of IS has been a challenging task to any organization including government hospitals. Government has invested a big amount of money on information system (IS) projects to improve service delivery in healthcare. However, several of them failed to be implemented successfully due to several factors. This article proposes a prevention model which incorporated Change Management (CM) concepts to avoid the failure of IS implementation, hence ensuring the success of it. Challenges of IS implementation in government hospitals have been discovered. Extensive literature review and deep interview approaches were employed to discover these challenges. A prevention model has been designed to cater the challenges. The model caters three main phases of implementation; pre-implementation, during implementation, and post-implementation by adopting CM practices of Lewin's, Kotter's and Prosci's CM model. Six elements of CM comprising thirteen sub-elements adopted from the three CM models have been used to handle CFFs of Human and Support issues; guiding team, resistance avoidance, IS adoption, enforcement, monitoring, and IS sustainability. Successful practice of the proposed mapping is expected to prevent CFFs to occur, hence ensuring a successful implementation of IS in the hospitals. The proposed model has been presented and successfully evaluated by the domain experts from the selected hospitals. The proposed model is believed to be beneficial for top management, IT practitioners and medical practitioners in preventing IS implementation failure among government hospitals towards ensuring the success implementation.

  19. Ethical budgets: a critical success factor in implementing new public management accountability in health care.

    Science.gov (United States)

    Bosa, Iris M

    2010-05-01

    New public management accountability is increasingly being introduced into health-care systems throughout the world - albeit with mixed success. This paper examines the successful introduction of new management accounting systems among general practitioners (GPs) as an aspect of reform in the Italian health-care system. In particular, the study examines the critical role played by the novel concept of an 'ethical budget' in engaging the willing cooperation of the medical profession in implementing change. Utilizing a qualitative research design, with in-depth interviews with GPs, hospital doctors and managers, along with archival analysis, the present study finds that management accounting can be successfully implemented among medical professionals provided there is alignment between the management imperative and the ethical framework in which doctors practise their profession. The concept of an 'ethical budget' has been shown to be an innovative and effective tool in achieving this alignment.

  20. Environmental and Social Management System Implementation Handbook : Food and Beverage

    OpenAIRE

    International Finance Corporation

    2014-01-01

    Environmental and social responsibility is becoming more and more important in today’s global economy. There are thousands of environmental and social codes and standards in the world today. The codes and standards define the rules and the objectives. But the challenge is in the implementation. An environmental and social management system (ESMS) helps companies to integrate the rules and ...

  1. 76 FR 70888 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-16

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Management District--SCAQMD) (1) Rule 1143, ``Consumer Paint Thinners & Multi-purpose Solvents...

  2. Knowledge Management Implementation in P2STPIBN as Internal TSO of BAPETEN

    International Nuclear Information System (INIS)

    Nugroho, D.H.

    2016-01-01

    Full text: Awareness of the importance of knowledge management implementation is growing since the launching in 2014 of BAPETEN’s (Nuclear Energy Regulatory Agency of Indonesia) vision to become a world-class nuclear energy regulatory agency. BAPETEN’s prime challenge arises since most of its human resources are still lacking experience, and many senior professionals have retired or are approaching retirement age. These challenges made P2STPIBN (Center for Regulatory Assessment on the Science and Technology of Nuclear Installation and Material) as an internal technical support organization (TSO) in BAPETEN aware that knowledge management should be implemented in advance. Following the BAPETEN Knowledge Management Guideline which was launched at the end of 2015, P2STPIBN, as part of BAPETEN, activated the knowledge management programme by creating a roadmap and programmes, such as a knowledge map and taxonomy, and a portal for knowledge repository (in progress). In the first quarter of FY of 2016 we started to build CoPs (community of practices) for the Nuclear Reactor Analysis, Nuclear Cyber Security and Nuclear Safety Culture based-on consideration of the needs on the most urgent knowledge. The CoP programme has run from the 2nd week of March 2016. The estimated challenges and anticipations are also discussed. (author

  3. Implementation of a change management solution based on a product lifecycle management system for a large international project; Einfuehrung eines Product-Lifecycle-Management-gestuetzten Aenderungsprozesses in einem internationalen Grossprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Luehr, Anneke

    2011-10-15

    This Thesis describes the implementation of a Change Management solution based on a Product Lifecycle Management System (PLM System) for a large international project. The objective of Change Management is to ensure a systematic line of action for approving and implementing changes in the project. The Deutsches Elektronen-Synchrotron DESY is one of the world's leading accelerator centres with locations in Hamburg and Zeuthen. Currently, DESY participates in the realization of the international research facility European X-Ray Free-Electron Laser (XFEL) at the Hamburg site. DESY was responsible for the planning of the XFEL. When the project entered the construction phase it was internationalized and now comprises project groups in 12 countries. Thus the requirements on Change Management have changed, as participants from several labs at many different locations are now involved. First the project scope is described and then a target process for the Change Management solution is developed by a requirement analysis. Afterwards the technical implementation of this process in DESY's PLM System is described and the Change Management solution is tested. The process is visualized using the Unified Modeling Language (UML). Finally a description is given of how to transfer the solution to the project environment. (orig.)

  4. GestationaL Obesity Weight management: Implementation of National Guidelines (GLOWING): a pilot cluster randomised controlled trial of a guideline implementation intervention for the management of maternal obesity by midwives.

    Science.gov (United States)

    Heslehurst, Nicola; Rankin, Judith; McParlin, Catherine; Sniehotta, Falko F; Howel, Denise; Rice, Stephen; McColl, Elaine

    2018-01-01

    Weight management in pregnancy guidelines exist, although dissemination alone is an ineffective means of implementation. Midwives identify the need for support to overcome complex barriers to practice. An evaluation of an intervention to support midwives' guideline implementation would require a large-scale cluster randomised controlled trial. A pilot study is necessary to explore the feasibility of delivery and evaluation prior to a definitive trial. The GestationaL Obesity Weight management: Implementation of National Guidelines (GLOWING) trial aims to test whether it is feasible and acceptable to deliver a behaviour change intervention to support midwives' implementation of weight management guidelines. GLOWING is a multi-centre parallel group pilot cluster randomised controlled trial comparing the delivery of a behaviour change intervention for midwives versus usual practice. Four NHS Trusts (clusters) will be randomised to intervention and control arms, stratified by size of maternity services. The intervention uses social cognitive theory and consists of face-to-face midwifery training plus information resources for routine practice. The main outcomes are whether the intervention and trial procedures are feasible and acceptable to participants and the feasibility of recruitment and data collection for a definitive trial. Target recruitment involves all eligible midwives in the intervention arm recruited to receive the intervention, 30 midwives and pregnant women per arm for baseline and outcome questionnaire data collection and 20 midwives and women to provide qualitative data. All quantitative and qualitative analyses will be descriptive with the purpose of informing the development of the definitive trial. This pilot study has been developed to support community midwives' implementation of guidelines. Community midwives have been selected as they usually carry out the booking appointment which includes measuring and discussing maternal body mass index. A

  5. Illustrating the multiple facets and levels of fidelity of implementation to a teacher classroom management intervention.

    Science.gov (United States)

    Reinke, Wendy M; Herman, Keith C; Stormont, Melissa; Newcomer, Lori; David, Kimberly

    2013-11-01

    Many school-based interventions to promote student mental health rely on teachers as implementers. Thus, understanding the interplay between the multiple domains of fidelity to the intervention and intervention support systems such as coaching and teacher implementation of new skills is an important aspect of implementation science. This study describes a systematic process for assessing multiple domains of fidelity. Data from a larger efficacy trial of the Incredible Years Teacher Classroom Management (IY TCM) program are utilized. Data on fidelity to the IY TCM workshop training sessions and onsite weekly coaching indicate that workshop leaders and the IY TCM coach implemented the training and coaching model with adequate adherence. Further, workshop leaders' ratings of engagement were associated with teacher implementation of specific praise, following training on this content. Lastly, the IY TCM coach differentiation of teacher exposure to coaching was evaluated and found to be associated with teacher implementation of classroom management practices and student disruptive behavior.

  6. Design and implementation of a safety health and environment management system in BHP Petroleum

    Energy Technology Data Exchange (ETDEWEB)

    Mattes, B.W.; Walters, C. [BHP Petroleum, Melbourne, VIC (Australia)

    1995-12-31

    The Australian/Asian operations group within BHP Petroleum (BHPP) is implementing and integrated management system with safety, occupational health and environmental elements as crucial components of all BHPP operations. Responsibility for the development, implementation and maintenance of the management system, and compliance with its provisions, rests with line management, a logical extension of the accountability and responsibility for safety, health and environment matters that rests with line managers within BHPP. Contractors are scrutinized to assess their safety, health and environmental performance and failure to meet minimal standards will result in their disqualification. The effectiveness of the BHPP Management System is yet to be fully determined, however, it will be measured against the performance of the company in the areas of zero lost time due to injuries, a drop in incidences requiring medical treatment or first aid, lower absenteeism and workers compensation bills, no oil spills, less car accidents, less back pain and RSI, better management of waste emissions to air, land and sea, and less equipment breakdowns. The trend in improved safety, health and environment performance are already apparent and auger well for the Company as it moves towards the new millennium. 7 figs., 2 photos., 4 refs.

  7. Implementing service quality based on ISO/IEC 20000 a management guide

    CERN Document Server

    Kunas, Michael

    2012-01-01

    Potential customers will look for suppliers with ISO/IEC 20000 certification, seeking the reassurance it provides. This book will guide you through implementation and certification. Your streamlined management processes will enable you to offer first-class customer service at competitive prices. The impact on your profit margins is clear!

  8. Challenges Implementing Work-Integrated Learning in Human Resource Management University Courses

    Science.gov (United States)

    Rook, Laura

    2017-01-01

    The examination of work-integrated learning (WIL) programs in the undergraduate Human Resource Management (HRM) curriculum is an area under-represented in the Australian literature. This paper identifies the challenges faced in implementing WIL into the HRM undergraduate curriculum. Qualitative semi-structured interviews were conducted with 38…

  9. A framework for implementation of user-centric identity management systems

    DEFF Research Database (Denmark)

    Adjei, Joseph K.; Olesen, Henning

    2010-01-01

    Users increasingly become part of electronic transactions, which take place instantaneously without direct user involvement. This leads to the risk of data manipulation, identity theft and privacy violation, and it has become a major concern for individuals and businesses around the world. Gov......-ernments in many countries are implementing identity man-agement systems (IdMS) to curtail these incidences and to offer citizens the power to exercise informational self-determination. Using concepts from technology adoption and fit-viability theo-ries as well as the laws of identity, this paper analyzes...... the crite-ria for successful implementation and defines a framework for a citizen-centric national IdMS. Results from a survey con-ducted in Ghana are also included....

  10. Environmental management systems implemented in the Spanish nuclear power plants

    International Nuclear Information System (INIS)

    Redondo, R.; Fernandez Guisado, M. B.; Hortiguela, R.; Bustamante, L. F.; Esparza, J. L.; Villareal, M.; Yague, F.

    2013-01-01

    The companies that own the Spanish Nuclear Power Plants, aware of social concern and in the context of a growing demanding environmental legislation, have a permanent commitment to the electricity production based on the principles of a maximum respect for the environment, safety, quality, professionalism and continuous improvement. In order to minimize the environmental impact of their plants they have implemented and Environmental Management System based on the ISO 14001 Standard. They minimize the environmental impact by identifying the significant environmental aspects and defining the corresponding objectives. This article describes the referred environmental management systems and their environmental objectives, as applied and defined by the Spanish Nuclear Power Plants. (Author)

  11. A framework to assess plan implementation maturity with an application to flood management in Vietnam

    NARCIS (Netherlands)

    Phi, Ho Long; Hermans, L.M.; Douven, W.J.A.M.; Halsema, Van G.E.; Khan, Malik Fida

    2015-01-01

    Implementation failure is a long-known Achilles’ heel of water and flood management plans. Contemporary planning approaches address the implementation challenge by using more participatory planning processes to ensure support for plans, assuming that this support will also benefit plan

  12. Evaluation of the Strategy Management Implementation in Project- Oriented Service Organizations

    Directory of Open Access Journals (Sweden)

    Abolfazl Sherafat

    2014-02-01

    Full Text Available Although developing strategic and operational plans is a difficult and complicated process, their successful implementation is much more difficult. Many organizations fail in the full implementation of their strategies. This is not due to the partial definition of strategies and organization‘s operational plan, but this is likely due to the lack of strong framework for creating alignment between employees and operational process and the organizational goals. To implement strategies effectively and to develop a comprehensive management system and to improve the performance, Robert Kaplan and David Norton introduced a modern management system which is Balanced ScoreCard. Likewise they introduced five main criteria: leadership, translation, alignment, every day process and ongoing process for a strategy oriented organization. This paper is intended to offer a systematic approach for measuring the effectiveness and efficiency of the strategic plan performance. For this study the questionnaire was distributed in a project- orientated service organization and after collection, by the use of statistical. Analysis especially factor analysis the grouping of sub-criteria under the five main criteria was confirmed. The statistical analysis showed that, two criteria of alignment and every day work had the lowest scores in terms of both implementation and effectiveness in the organization‘s senior and executive manager‘s point of view. With deep interview, studying of scorecards and meeting of the strategic committee of the studied organization, the two dimension of alignment and every day work were further examined and after identifying upgradeable areas, some suggestions for improving the effectiveness and efficiency of the studied organization were presented.

  13. Implementation of a standardized out-of-hospital management method for Parkinson dysphagia

    OpenAIRE

    Wei, Hongying; Sun, Dongxiu; Liu, Meiping

    2017-01-01

    Summary Objective: Our objective is to explore the effectiveness and feasibility of establishing a swallowing management clinic to implement out-of-hospital management for Parkinson disease (PD) patients with dysphagia. Method: Two-hundred seventeen (217) voluntary PD patients with dysphagia in a PD outpatient clinic were divided into a control group with 100 people, and an experimental group with 117 people. The control group was given dysphagia rehabilitation guidance. The experimental gr...

  14. 75 FR 25778 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California... Identification of plan. * * * * * (c) * * * (377) * * * (i) * * * (B) Yolo Solano Air Quality Management District...

  15. 78 FR 30768 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-05-23

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  16. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-10-25

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of.... * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management District. (1) Rule 1159...

  17. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-28

    ... California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District (SCAQMD) portion of the California State...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid...

  18. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-05-27

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9...

  19. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of.... * * * * * (c) * * * (378) * * * (i) * * * (E) Feather River Air Quality Management District. (1) Rule 3.22...

  20. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California... Governor's Designee. (i) Incorporation by reference. (A) South Coast Air Quality Management District. (1...