WorldWideScience

Sample records for sample equipment upgrade

  1. Mongolia - Vocational Education - Equipment Upgrades

    Data.gov (United States)

    Millennium Challenge Corporation — Evaluation design The impact evaluation sought to identify the causal impact of exposure to equipment upgrades on subsequent outcomes. Insofar as we were not able to...

  2. Equipment and performance upgrade of compact nuclear simulator

    International Nuclear Information System (INIS)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators

  3. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators.

  4. 38 CFR 17.351 - Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center.

    Science.gov (United States)

    2010-07-01

    ... replacement and upgrading of equipment at Veterans Memorial Medical Center. 17.351 Section 17.351 Pensions... Philippines § 17.351 Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center. Grants to assist the Republic of the Philippines in the replacement and upgrading of equipment and in...

  5. 38 CFR 17.352 - Amounts and use of grant funds for the replacement and upgrading of equipment.

    Science.gov (United States)

    2010-07-01

    ... funds for the replacement and upgrading of equipment. 17.352 Section 17.352 Pensions, Bonuses, and... Amounts and use of grant funds for the replacement and upgrading of equipment. Grants awarded under § 17... States for the purpose. Funds appropriated for the upgrading and replacement of equipment at the Veterans...

  6. Performance Evaluation and Suggestion of Upgraded Fuel Handling Equipment for Operating OPR1000

    International Nuclear Information System (INIS)

    Chang, Sang Gyoon; Hwang, Jeung Ki; Choi, Taek Sang; Na, Eun Seok; Lee, Myung Lyul; Baek, Seung Jin; Kim, Man Su; Kunik, Jack

    2011-01-01

    The purpose of this study is to evaluate the performance of upgraded FHE (Fuel Handling Equipment) for operating OPR 1000 (Optimized Power Reactor) by using data measured during the fuel reloading, and make some suggestions on enhancing the performance of the FHE. The fuel handling equipment, which serves critical processes in the refueling outage, has been upgraded to increase and improve the operational availability of the plant. The evaluation and suggestion of this study can be a beneficial tool related to the performance of the fuel handling equipment

  7. Experiences in seismic upgrading of equipment and structures in Kozloduy nuclear power plant (440 WWER-PWR)

    International Nuclear Information System (INIS)

    Ordonez Villalobos, A.

    1993-01-01

    Within the framework of the 'Emergency programme for Nuclear Safety of Kozloduy NPP' it has been concluded that the increase in seismic safety of a NPP can be achieved by upgrading the key equipment in a cost effective way. Essential and vulnerable equipment has to be identified. Seismic capacity should be evaluated base don realistic state of the art criteria. Seismic review teams ef experienced engineers should conduct planned walk-downs in order to propose effective upgrading solutions. Team work of plan engineers and construction engineers would enhance the effectiveness of the solutions. It is recommended that all the participants be motivated and have a clear understanding of the objectives of the upgrading

  8. EMI environment EMC considerations concerning equipment upgrades at a nuclear utility power generating station a case history

    International Nuclear Information System (INIS)

    Metcalf, M.J.

    1993-01-01

    As equipment is upgraded during scheduled power outages in nuclear power generating stations, more and more utilities will be faced with the problem of dealing with Electromagnetic Compatibility (EMC) issues that have evolved with the trend of manufacturers designing equipment based around state-of-the-art high technology logic devices. This paper lists Commonwealth Edison Company (CECO) equipment that was scrutinized by National Technical Systems (NTS) for its EMI impact. The test requirements and test procedures for assessing EMI and EMC are outlined. Although on-site mapping data was gathered to assist CECO for the upgrade described here of the Auxiliary Electric Equipment Room of a Westinghouse Eagle 21 Reactor Protection System at the Zion Unit No.1 Station, blanket mapping of every location for every upgrade is a short term, expensive solution to the EMI problem. It is concluded that the primary problem of lack of system and component level EMI specifications must be addressed by a governing body. 7 refs., 2 figs

  9. Equipment and performance upgrade of compact nuclear simulator

    International Nuclear Information System (INIS)

    Park, J. C.; Kwon, K. C.; Lee, D. Y.; Hwang, I. K.; Park, W. M.; Cha, K. H.; Song, S. J.; Lee, J. W.; Kim, B. G.; Kim, H. J.

    1999-01-01

    The simulator at Nuclear Training Center in KAERI became old and has not been used effectively for nuclear-related training and researches due to the problems such as aging of the equipment, difficulties in obtaining consumables and their high cost, and less personnel available who can handle the old equipment. To solve the problems, this study was performed for recovering the functions of the simulator through the technical design and replacement of components with new ones. As results of this study, our test after the replacement showed the same simulation status as the previous one, and new graphic displays added to the simulator was effective for the training and easy for maintenance. This study is meaningful as demonstrating the way of upgrading nuclear training simulators that lost their functioning due to the obsolescence of simulators and the unavailability of components

  10. The suitability and installation of technological equipment when upgrading existing facilities

    Directory of Open Access Journals (Sweden)

    Ladnushkin A. A.

    2016-03-01

    Full Text Available to date, a large number of Russian companies in diverse and various industries, has old equipment and requires modernization of the technological process due to the growth of scientific and technological progress. In order to achieve goals when upgrading is considered such an important aspect as the readiness of the new equipment installation. Mounting hardware suitability describes the suitability and readiness of equipment for efficient Assembly at the user. Replacement of technological equipment requires large volumes of works on installation and dismantling, in the absence of the building has its own lifting mechanisms require large financial and labor costs. One of possible methods for replacement of process equipment is the technology of without crane installation allows us to carry out work in existing space planning. Today is the question of the necessity of development and introduction of new technological production methods and fixtures tooling in which it is possible to conduct installation and dismantling of technological equipment in the operating production process.

  11. Upgradation of nuclear medical equipment in the developing countries and its impact in Bangladesh

    International Nuclear Information System (INIS)

    Jahangir, Saleh Mahmud; Xie, Y.; Uddin, Md. Rokon; Haque, Mohammod Abu Sayid; Hoq, Mahbubul; Mawla, Yasmeen; Alom, Md. Zahangir; Morium, Tasnim

    2002-11-01

    Bangladesh has thirteen Nuclear Medical Centres and one Institute of Nuclear Medicine in the country which are being run and maintained by the physicians scientists and engineers of Bangladesh Atomic Energy Commission. The peaceful application of atomic energy was initiated through all these Centres with the use of clinical isotopes for thyroid and kidney studies. The equipment used for these purposes were the thyroid uptake system, rectilinear scanner and the multiprobe renogram system. The first gamma camera was installed in the country in 1980 at the Institute of Nuclear Medicine, Dhaka. That was the turning point for the country in the field of nuclear medicine. Presently all the nuclear medical establishments are equipped least with a gamma camera, thyroid uptake system and a renogram system. In the last two decades there has been a tremendous development in the design of nuclear medical equipment. Most of the old equipments were slow and manually operated. In the beginning of nineties of the past century there was an uprising in the computer technology and most of the manually operated machines were brought under computerization. It was basically done with a custom built processor to perform only the specific job and spare the users from doing some extra manual work. But the performances of the recent models of the same computerized equipment are by far the best as compared with the past ones. This report describes the role of the IAEA in the upgradation of medical equipment, PC interfacing, upgrading of old gamma cameras and the technological and socio-economic impact in Bangladesh

  12. Performing instrumentation and controls upgrades

    International Nuclear Information System (INIS)

    Kessler, F. M.; Connell, T. J.; Ryan, M. P.

    1992-01-01

    I and C upgrades are comprised of a varying range of content, complexity, expansiveness, and criticality. There are common threads in all upgrades which can be simplified by the development of a long term I and C upgrade plan. The development of a such a plan can establish effective ground rules for upgrades, large and small. It can be the basis from which to begin an upgrade evaluation and the standard which is used to compare the degree of compliance of any upgrade regarding the plan or to define the differences from the plan and an individual upgrade. Primary motivation for I and C upgrades are obsolescence and unavailability of spare parts. Numerous other areas of consideration are also involved in an upgrade. Today's technology results in most upgrades largely or totally utilizing digital equipment. The use of digital equipment is fairly new in many I and C applications and requires an elaborate evaluation from functional, qualification, operational, and licensing perspectives as well as others. A well defined upgrade plan developed as a basis for I and C upgrades is a significant start to ensuring an effective upgrade process. Properly developed and implemented, the plan will support I and C upgrade efforts to ensure that the intricacies associated with such tasks eliminate the existing problems which require the upgrade to be performed. The upgrade plan also results in ensuring the maximum benefit from all perspectives of the plant enhancements being carried out and considered for future implementation. Instrumentation and controls aging and replacement are issues of growing importance due to the potential for significant impact on plant operation and efficiency. Obsolescence and unavailability of spare parts are major drivers towards evaluating the cost benefits of upgrading current equipment. In addition to these two primary factors, the advantages of utilizing digital equipment have also become of prime importance when evaluating instrumentation and

  13. Upgrading of seismic capacity of WWER equipment including reactor control rods and distribution systems

    International Nuclear Information System (INIS)

    Kostarev, V.

    1993-01-01

    This paper concerns the experience of CKTI VIBROSEISM firm (CVS) in seismic capacity upgrading of the WWER equipment and pipings. During the last 15 years CVS has accumulated a lot of experimental and analysis results on many of WWER units 'in former Soviet Union. That might be very useful in seismic protecting of East European Nuclear Power Plants. (author)

  14. Upgrading Planning and Executive Strategy for Reactor Protection System and Relative Equipment in Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jiang Zuyue

    2010-01-01

    Qinshan Nuclear Power Plant (QNPP) is the first nuclear power plant in China which completed the reactor protection system (RPS) upgrading with new digital safety instrumentation and control (I and C) platform instead of original analog system. At the same time,the nuclear instrumentation system (NIS) was upgraded with the same digital I and C platform. For adapting QNPP's actual engineering situation,the upgrading planning was taken by comprehensively investigating current development and application of digital safety I and C platform in the worldwide scope and by reviewing plant's original systems operation history. The project executive strategy-QNPP's leading role with necessary overseas cooperation and internal technical supports as great as possible, was determined. Some significant factors might influence and restrict the RPS and relative equipment upgrading executive actions in an operating NPP were analyzed.Finally, the engineering feasibility was briefly assessed to recognize the anticipated issues and difficulties and to prepare the relative solutions in advance for the purpose of ensuring the RPS upgrading objectives completely realized. (authors)

  15. Backbone upgrades and DEC equipment replacement

    Science.gov (United States)

    Vancamp, Warren

    1991-01-01

    The NASA Science Internet (NSI) dual protocol backbone is outlined. It includes DECnet link upgrades to match TCP/IP link performance. It also includes the integration of backbone resources and central management. The phase 1 transition process is outlined.

  16. Drawing Evaluation Report for Sampling Equipment Drawings

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999, when equipment ownership is determined

  17. Drawing evaluation report for sampling equipment drawings

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  18. The Ural Electrochemical Integrated Plant Process for Managing Equipment Intended for Nuclear Material Protection, Control and Accounting System Upgrades

    International Nuclear Information System (INIS)

    Yuldashev, Rashid; Nosov, Andrei; Carroll, Michael F.; Garrett, Albert G.; Dabbs, Richard D.; Ku, Esther M.

    2008-01-01

    Since 1996, the Ural Electrochemical Integrated Plant (UEIP) located in the town of Novouralsk, Russia, (previously known as Sverdlovsk-44) and the United States Department of Energy (U.S. DOE) have been cooperating under the Nuclear Material Protection, Control and Accounting (MPC and A) Program. Because UEIP is involved in the processing of highly enriched uranium (HEU) into low enriched uranium (LEU), and there are highly enriched nuclear materials on its territory, the main goal of the MPC and A cooperation is to upgrade those systems that ensure secure storage, processing and transportation of nuclear materials at the plant. UEIP has completed key upgrades (equipment procurement and installation) aimed at improving MPC and A systems through significant investments made by both the U.S. DOE and UEIP. These joint cooperative efforts resulted in bringing MPC and A systems into compliance with current regulations, which led to nuclear material (NM) theft risk reduction and prevention from other unlawful actions with respect to them. Upon the U.S. MPC and A project team's suggestion, UEIP has developed an equipment inventory control process to track all the property provided through the MPC and A Program. The UEIP process and system for managing equipment provides many benefits including: greater ease and efficiency in determining the quantities, location, maintenance and repair schedule for equipment; greater assurance that MPC and A equipment is in continued satisfactory operation; and improved control in the development of a site sustainability program. While emphasizing UEIP's equipment inventory control processes, this paper will present process requirements and a methodology that may have practical and helpful applications at other sites.

  19. Development of electric discharge equipment for small specimen sampling

    International Nuclear Information System (INIS)

    Okamoto, Koji; Kitagawa, Hideaki; Kusumoto, Junichi; Kanaya, Akihiro; Kobayashi, Toshimi

    2009-01-01

    We have developed the on-site electric discharge sampling equipment that can effectively take samples such as small specimens from the surface portion of the plant components. Compared with the conventional sampling equipment, our sampling equipment can take samples that are thinner in depth and larger in area. In addition, the affection to the equipment can be held down to the minimum, and the thermally-affected zone of the material due to electric discharge is small, which is to be ignored. Therefore, our equipment is excellent in taking samples for various tests such as residual life evaluation.

  20. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  1. Drawing evaluation report for sampling equipment drawings; TOPICAL

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  2. Development of requirements for seismic upgrading of equipment of existing WWER-440 and WWER-1000 type NPPs

    International Nuclear Information System (INIS)

    Kaznovsky, S.; Ostretsov, I.

    1993-01-01

    The change in seismology data and safety demands a necessity arose for seismic upgrading of the existing operating NPPs of WWER type which have been originally designed and built without or with simplifies calculations of seismic influences. The paper describes the traditional methods and approaches and calculation-experimental method for examining and ensuring of equipment seismic resistance at the NPPs directly. Method of ground explosions is included as well

  3. CANDU Digital Control Computer upgrade options

    International Nuclear Information System (INIS)

    De Jong, M.S.; De Grosbois, J.; Qian, T.

    1997-01-01

    This paper reviews the evolution of Digital Control Computers (DCC) in CANDU power plants to the present day. Much of this evolution has been to meeting changing control or display requirements as well as the replacement of obsolete, or old and less reliable technology with better equipment that is now available. The current work at AECL and Canadian utilities to investigate DCC upgrade options, alternatives, and strategies are examined. The dependence of a particular upgrade strategy on the overall plant refurbishment plans are also discussed. Presently, the upgrade options range from replacement of individual obsolete system components, to replacement of the entire DCC hardware without changing the software, to complete replacement of the DCCs with a functionally equivalent system using new control computer equipment and software. Key issues, constraints and objectives associated with these DCC upgrade options are highlighted. (author)

  4. DWPF liquid sample station: Status of equipment development

    International Nuclear Information System (INIS)

    Caplan, J.R.

    1987-01-01

    This report summarizes operating experience and equipment status of the DWPF liquid sample cell. Operation hours to date, results of equipment inspections and problems encountered and their solutions are discussed. An equipment and instrumentation status updating DPST-85-592, DWPF LIQUID SAMPLE CELL MOCK-UP, is presented. Remaining development items are also outlined

  5. Design and implementation experience of seismic upgrades at Kozloduy and Paks NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Borov, V; Trichkov, V; Alexandrov, A; Jordanov, M [EQE-Bulgaria, Sofia (Bulgaria)

    1995-07-01

    Series of upgrades have been designed and implemented by EQE-Bulgaria at Kozloduy NPP and as a subcontractor of EQE-International - at Paks NPP. Wide variety of facilities have been upgraded, including Electrical Equipment, Control and Instrumentation Equipment, Technological Equipment, Brick Walls and Building Structures. Different design approaches and concepts have been applied in compliance with the specific technological and structural conditions. The effect of the excitation intensity as well as the presence of specific floor response spectra over the upgrading concept and cost is discussed. Specific problems of supporting heavy technological equipment are noted. A practical approach for seismic upgrading of Brick Walls, as well as a tendency for unification of the engineering design is shown. The first completely upgraded Building Structure at Kozloduy NPP is the structure of the Electrical Control Building to the Diesel Generator of the River-bank Pump Station. Specific problems of the implementation of the final upgrading design of the Diesel Generator Building are outlined. (author)

  6. Design and implementation experience of seismic upgrades at Kozloduy and Paks NPPs

    International Nuclear Information System (INIS)

    Borov, V.; Trichkov, V.; Alexandrov, A.; Jordanov, M.

    1995-01-01

    Series of upgrades have been designed and implemented by EQE-Bulgaria at Kozloduy NPP and as a subcontractor of EQE-International - at Paks NPP. Wide variety of facilities have been upgraded, including Electrical Equipment, Control and Instrumentation Equipment, Technological Equipment, Brick Walls and Building Structures. Different design approaches and concepts have been applied in compliance with the specific technological and structural conditions. The effect of the excitation intensity as well as the presence of specific floor response spectra over the upgrading concept and cost is discussed. Specific problems of supporting heavy technological equipment are noted. A practical approach for seismic upgrading of Brick Walls, as well as a tendency for unification of the engineering design is shown. The first completely upgraded Building Structure at Kozloduy NPP is the structure of the Electrical Control Building to the Diesel Generator of the River-bank Pump Station. Specific problems of the implementation of the final upgrading design of the Diesel Generator Building are outlined. (author)

  7. Status of the University of Missouri-Columbia Research Reactor upgrade

    International Nuclear Information System (INIS)

    McKibben, J.C.; Edwards, C.B. Jr.; Meyer, W.A. Jr.; Kim, S.S.

    1990-01-01

    The University of Missouri-Columbia (MU) Research Reactor Facility staff is in the process of upgrading the operational and research capabilities of the reactor and associated facilities. The upgrades include an extended life aluminide fuel element, a power increase, improved instrumentation and control equipment, a cold neutron source, a building addition, and improved research instrumentation and equipment. These upgrades will greatly enhance the capabilities of the facility and the research programs. This paper discusses the parts of the upgrade and current status of implementation. (author)

  8. Status of the University of Missouri-Columbia Research Reactor upgrade

    Energy Technology Data Exchange (ETDEWEB)

    McKibben, J C; Edwards, Jr, C B; Meyer, Jr, W A [MU Research Reactor, Columbia, MO (United States); Kim, S S [Idaho Nuclear Engineering Laboratory, Idaho Falls, ID (United States)

    1990-05-01

    The University of Missouri-Columbia (MU) Research Reactor Facility staff is in the process of upgrading the operational and research capabilities of the reactor and associated facilities. The upgrades include an extended life aluminide fuel element, a power increase, improved instrumentation and control equipment, a cold neutron source, a building addition, and improved research instrumentation and equipment. These upgrades will greatly enhance the capabilities of the facility and the research programs. This paper discusses the parts of the upgrade and current status of implementation. (author)

  9. Greenbelt Homes Pilot Program. Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    Energy Technology Data Exchange (ETDEWEB)

    Wiehagen, J. [Home Innovation Research Labs, Marlboro, MD (United States); Del Bianco, M. [Home Innovation Research Labs, Marlboro, MD (United States); Mallay, D. [Home Innovation Research Labs, Marlboro, MD (United States)

    2015-05-22

    The U.S. Department of Energy Building America team Partnership for Home Innovation wrote a report on Phase 1 of the project that summarized a condition assessment of the homes and evaluated retrofit options within the constraints of the cooperative provided by GHI. Phase 2 was completed following monitoring in the 2013–2014 winter season; the results are summarized in this report. Phase 3 upgrades of heating equipment will be implemented in time for the 2014–2015 heating season and are not part of this report.

  10. Estimation of Airline Benefits from Avionics Upgrade under Preferential Merge Re-sequence Scheduling

    Science.gov (United States)

    Kotegawa, Tatsuya; Cayabyab, Charlene Anne; Almog, Noam

    2013-01-01

    Modernization of the airline fleet avionics is essential to fully enable future technologies and procedures for increasing national airspace system capacity. However in the current national airspace system, system-wide benefits gained by avionics upgrade are not fully directed to aircraft/airlines that upgrade, resulting in slow fleet modernization rate. Preferential merge re-sequence scheduling is a best-equipped-best-served concept designed to incentivize avionics upgrade among airlines by allowing aircraft with new avionics (high-equipped) to be re-sequenced ahead of aircraft without the upgrades (low-equipped) at enroute merge waypoints. The goal of this study is to investigate the potential benefits gained or lost by airlines under a high or low-equipped fleet scenario if preferential merge resequence scheduling is implemented.

  11. Introduction of sample environment equipment for neutron scattering experiments

    International Nuclear Information System (INIS)

    Shimojo, Yutaka; Ihata, Yoshiaki; Kaneko, Koji; Takeda, Masayasu

    2013-02-01

    Neutron scattering experiments have been frequently performed under variety of sample conditions, such as various temperatures, pressures, magnetic fields and stresses, and those complex conditions to fully utilize superior properties of neutron. To this aim, a number of sample environment equipment, refrigerators, furnaces, pressure cells, superconducting magnets are equipped in JRR-3 to be used for experiments. In this document, all available sample environment equipment in both JRR-3 reactor and guide halls are summarized. We hope this document would help neutron scattering users to perform effective and excellent experiments. (author)

  12. High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test

    Energy Technology Data Exchange (ETDEWEB)

    Richard D. Boardman; B. H. O& #39; Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

    2004-02-01

    indicate that sodium-bearing waste can be successfully calcined at 600 C with an AAR of 1.75. Unburned hydrocarbons are reduced to less than 10 ppm (7% O2, dry basis), with >90% reduction of NOx emissions. Mercury removal by the carbon bed reached 99.99%, surpassing the control efficiency needed to meet MACT emissions standards. No deleterious impacts on the carbon bed were observed during the tests. The test results imply that upgrading the NWCF calciner with a more efficient cyclone separator and the proposed MACT equipment can process the remaining tanks wastes in 3 years or less, and comply with the MACT standards.

  13. Characterization sampling equipment status report - April through June 1996

    International Nuclear Information System (INIS)

    Blanchard, R.J.

    1996-01-01

    This report is the third status report on Characterization Sampling Equipment. It covers April through June 1996 activities. Subsequent reports are intended to be issued quarterly. The degree of success in sample recovery and in the availability of equipment to take samples is reported on as are the measures being taken to track and improve recovery and availability. Planned activities are also presented

  14. Industry perspective on digital upgrades: A utility perspective on digital upgrades

    International Nuclear Information System (INIS)

    Blauw, R.J.

    1994-01-01

    Nuclear utilities face the need to upgrade aging and obsolete safety related and other critical equipment. This is the result of operation and maintenance concerns for reliability and maintainability. Digital technology is an option for these upgrades. A number of utilities have attempted exercising the digital option. The regulatory licensing results have been inconsistent and have raised a variety of issues. These issues and the subsequent licensing uncertainties have caused some utilities to temporarily drop digital technology as an upgrade option. Resolution of these issues and the need for regulatory stability is driving the development of industry standards and guidelines. These will provide guidance to support consistent design and implementation of digital upgrades. Successful completion of these documents is necessary for renewed consideration of the use of digital technology. This paper will present a utility perspective on how project management, configuration control, and a rigorous design process can serve to address the present regulatory issues. These issues include commercial grade dedication, reliability, electromagnetic interference, and failure and error management. This perspective is consistent with the standards and guidelines development effort

  15. Approach of seismic upgrading in Kashiwazaki-Kariwa Nuclear Power Plant

    International Nuclear Information System (INIS)

    Sato, Hitoshi

    2009-01-01

    Because guide for reviewing seismic design of nuclear power reactor facilities was reworked in 2006, we formulated new Design Base Seismic Motion Ss, and we are doing evaluation of seismic safety (back-check). In Japan, depending on aseismatic importance, equipments are classified into S-class, B-class and C-class. For S-class equipments, we evaluate it on the basis of new Ss, and do seismic upgrading. For B-class and C-class equipments, we do seismic upgrading voluntarily on the basis of the experiences of the Niigataken Chuetsu-Oki (NCO) Earthquake. (author)

  16. Equipment for collecting samples of radioactive solutions

    International Nuclear Information System (INIS)

    Raggenbass, A.; Fradin, J.; Joubert, G.

    1958-01-01

    The authors present an equipment aimed at collecting samples of fission products to perform radio-chemical analysis. As the sample must have a total activity between 1 and 50 micro-Curie, this installation comprises a sampling system and a dilution device which aims at bringing the sample to the suitable activity. Samples are collected by means of needles. The sample reproducibility is discussed. The dilution device is described

  17. Status of the Upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M; Bartmann, W; Bartolome, S; Benedetto, E; Bertone, C; Blas, A; Bonnal, P; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Carlier, E; Cole, J; Dahlen, P; Delonca, M; Dobers, T; Findlay, A; Froeschl, R; Hansen, J; Hay, D; Jensen, S; Lacroix, J; Le Roux, P; Lopez Hernandez, L; Maglioni, C; Masi, A; Mason, G; Mathot, S; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Olek, S; Paoluzzi, M; Perillo-Marcone, A; Pittet, S; Puccio, B; Raginel, V; Riffaud, B; Ruehl, I; Sarrió Martínez, A; Tan, J; Todd, B; Venturi, V; Weterings, W

    2013-01-01

    The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H- ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.

  18. Safety upgrade at the Leningrad NPP

    International Nuclear Information System (INIS)

    Eperin, A.P.

    1996-01-01

    The LNPP was developed according to the standards of early 70's but, at the same time, during the whole period of operation, the Plant equipment, technological, automatic and control and protection systems were upgraded with regard to changing safety and reliability requirements. Main steps taken during the backfitting stage to improve the reliability and safety of LNPP equipment and systems are discussed

  19. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Lee, Dong Young; Cha, Kyung Ho; Park, Won Man; Song, Soon Ja; Lee, Jung Woon; Oh, In Seok; Moon, Byung Sou; Ham, Chang Shik; Seh, Kyung Won; Joo, Young Chang; Lee, Eui Jin

    1999-12-01

    We developed techniques for upgrading nuclear power plant simulators that lost some function due to aging and obsolescence of parts. This project will provide a guidance for resolving the problems with aged simulators. We transplanted the simulation code operated in Macro-VAX II into the HP workstation with operating system version 10.20. If further research is proceeded, it will be possible to build simulator system on PCs. (author)

  20. Year 2000 compliance status report for core sampling equipment

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    Several pieces of equipment that support core sampling activities are ''date aware'' and could be affected by the roll over to the year 2000. This report documents the testing and remedial efforts for this equipment

  1. Upgrade of Instrumentation for Purdue Reactor PUR-1

    International Nuclear Information System (INIS)

    Revankar, S.T.; Merritt, E.; Bean, R.

    2000-01-01

    The major objective of this program was to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective two projects on instrument upgrade were implemented. The first one was to convert the vacuum tube control and safety amplifiers (CSA) to solid state electronics, and the other was to upgrade the electrical and electronic shielding. This report is the annual report and gives the efforts and progress achieved on these two projects from July 1999 to June 2000

  2. High Flux Isotope Reactor power upgrade status

    International Nuclear Information System (INIS)

    Rothrock, R.B.; Hale, R.E.; Cheverton, R.D.

    1997-01-01

    A return to 100-MW operation is being planned for the High Flux Isotope Reactor (HFIR). Recent improvements in fuel element manufacturing procedures and inspection equipment will be exploited to reduce hot spot and hot streak factors sufficiently to permit the power upgrade without an increase in primary coolant pressure. Fresh fuel elements already fabricated for future use are being evaluated individually for power upgrade potential based on their measured coolant channel dimensions

  3. Seismic soil-structure-equipment interaction analysis of unit 5/6, Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Kostov, M [Bulgarian Academy of Sciences, Central Laboratory for Seismic Mechanics and Earthquake Engineering, Sofia (Bulgaria)

    1995-07-01

    This research project is aimed to analyse problems of soil-structure-equipment interaction under seismic excitation in case of Kozloduy NPP. Reevaluation and upgrading of Kozloduy NPP has started after 1977 Vrancea earthquake. New Safe Shutdown Earthquake (SSE) level was defined, upgrading most of structural equipment was performed, seismic instrumentation was installed. New investigations were initiated after 1990 IAEA mission visited the site. A comprehensive site confirmation project was started with a subsequent structural and equipment reevaluation and upgrading. This work deals with Units 5 and 6 of WWER-1000 type only.

  4. LHCb VELO Upgrade

    CERN Document Server

    Hennessy, Karol

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of $2\\times10^{33} \\mathrm{cm}^{-2}\\mathrm{s}^{-1}$. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have $55\\times55 \\mu m^{2}$ pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separate...

  5. LHCb DAQ network upgrade tests

    CERN Document Server

    Pisani, Flavio

    2013-01-01

    My project concerned the evaluation of new technologies for the DAQ network upgrade of LHCb. The first part consisted in developing and Open Flow-based Clos network. This new technology is very interesting and powerful but, as shown by the results, it still needs further improvements. The second part consisted in testing and benchmarking 40GbE network equipment: Mellanox MT27500, Chelsio T580 and Huawei Cloud Engine 12804. An event-building simulation is currently been performed in order to check the feasibility of the DAQ network upgrade in LS2. The first results are promising.

  6. Upgrade of the CATS sample changer on FIP-BM30A at the ESRF: towards a commercialized standard

    International Nuclear Information System (INIS)

    Jacquamet, L.; Joly, J.; Charrault, P.; Pirocchi, M.; Vernede, X.; Bouis, F.; Borel, F.; Ferrer, J.L.; Perin, J.P.; Denis, T.; Rechatin, J.L.

    2009-01-01

    An upgraded version of the sample changer 'CATS' (Cryogenic Automated Transfer System) that was developed on the FIP-BM30A beamline at the ESRF is presented. At present, CATS is installed at SLS (three systems), BESSY (one system), DLS (two systems) and APS (four systems for the LSCAT beamline). It consists mainly of an automated Dewar with an assortment of specific grippers designed to obtain a fast and reliable mounting/dismounting rate without jeopardizing the flexibility of the system. The upgraded system has the ability to manage any sample standard stored in any kind of puck. (authors)

  7. Facilities upgrade for natural forces: traditional vs. realistic approach

    International Nuclear Information System (INIS)

    Terkun, V.

    1985-01-01

    The traditional method utilized for upgrading existing buildings and equipment involves the following steps: performs structural study using finite element analysis and some in situ testing; compare predicted member forces/stresses to material code allowables; determine strengthening schemes for those structural members judged to be weak; estimate cost for required upgrades. This approach will result in structural modifications that are not only conservative but very expensive as well. The realistic structural evaluation approach uses traditional data to predict structural weaknesses as a final step. Next, using considerable information now available for buildings and equipment exposed to natural hazards, engineering judgments about structures being evaluated can be made with a great deal of confidence. This approach does not eliminate conservatism entirely, but it does reduce it to a reasonable and realistic level. As a result, the upgrade cost goes down without compromising the low risk necessary for vital facilities

  8. EBR-II fuel handling console digital upgrade

    International Nuclear Information System (INIS)

    Peters, G.G.; Wiege, D.D.; Christensen, L.J.

    1995-01-01

    The main fuel handling console and control system at the Experimental Breeder Reactor II (EBR-II) are being upgraded to a computerized system using high-end workstations for the operator interface and a programmable logic controller (PLC) for the control system. Two-dimensional (2D) and three-dimensional (3D) computer graphics will be provided for the operator which will show the relative position of under-sodium fuel handling equipment. This equipment is operated remotely with no means of directly viewing the transfer. This paper describes various aspects of the modification including reasons for the upgrade, capabilities the new system provides over the old control system, philosophies and rationale behind the new design, testing and simulation work, diagnostic features, and the advanced graphics techniques used to display information to the operator

  9. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Kallenbach, A.; Aguiam, D.; Aho-Mantila, L.

    2017-01-01

    The ASDEX Upgrade (AUG) programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. Since 2015, AUG is equipped with a new pair of 3-strap ICRF antennas, which were design...

  10. Upgrading instrumentation and control systems for plant safety and operation

    International Nuclear Information System (INIS)

    Martin, M.; Prehler, H.J.; Schramm, W.

    1997-01-01

    Upgrading the electrical systems and instrumentation and control systems has become increasingly more important in the past few years for nuclear power plants currently in operation. As the requirements to be met in terms of plant safety and availability have become more stringent in the past few years, Western plants built in the sixties and seventies have been the subject of manifold backfitting and upgrading measures in the past. In the meantime, however, various nuclear power plants are facing much more thorough upgrading phases because of the difficulties in obtaining spare parts for older equipment systems. As digital technology has become widespread in many areas because of its advantages, and as applications are continuously expanding, conventional equipment and systems are losing more and more ground as a consequence of decreasing demand. Merely because of the pronounced decline in demand for conventional electronic components it is possible for equipment manufacturers to guarantee spare parts deliveries for older systems only for specific future periods of time. In addition, one-off manufacture entails high costs in purchases of spare parts. As a consequence of current thinking more and more focusing on availability and economy, upgrading of electrical systems and instrumentation and control systems is becoming a more and more topical question, for older plants even to ensure completion of full service life. (orig.) [de

  11. QPS upgrade and machine protection during LS1

    International Nuclear Information System (INIS)

    Denz, R.

    2012-01-01

    The presentation will explain all the proposed changes and discuss the impact on other shutdown activities. The upgrade of the LHC Quench Protection System QPS during LS1 with respect to radiation to electronics will concern the re-location of equipment and installation of new radiation tolerant hardware. The mid-term plan for further R2E upgrades will be addressed. The protection systems for insertion region magnets and inner triplets will be equipped with a dedicated bus-bar splice supervision including some additional modifications in order to improve the EMC immunity. The extension of the supervision capabilities of the QPS will concern the quench heater circuits, the earth voltage feelers and some tools to ease the system maintenance. The protection of the undulators will be revised in order to allow more transparent operation. The installation of snubber capacitors and arc chambers for the main quad circuits will complete the upgrade of the energy extraction systems. Finally the re-commissioning of the protection systems prior to the powering tests will be addressed. (author)

  12. Maintenance and fabrication of nuclear electronic equipment

    International Nuclear Information System (INIS)

    Hong, Seok Boong; Chung, Chong Eun; Hwang, In Koo; Koo, In Soo; Park, Bum; Kim, Soo Hee; Lee, Seong Joo; Kim, Min Seok; Choi, Wha Lim

    2011-12-01

    - process equipment at PIEF, Chemical Analysis Team and RWFTF have been calibrated. - The electronic equipment and radiation equipment at RWTF and PIEF have been prepared. - Development and installation of integrated RMS software for Hanaro Cold Neutron Laboratory Building(CNLB) RMS, and development and performance upgrade of a portal monitor for CNLB. - Performance test of the Hardware/Software of digital unit controller has been performed, and functional upgrade of the Hardware/Software of stimulator for SMART MMIS performance test facility has also been performed. - A controller of high voltage power supply for a small electron beam generator and a controller for razer pinning and a remote monitoring apparatus of cathode power supply for a 0.2 Mev. small electron beam generator have been designed and fabricated. - Database construction for effective maintenance for the process equipment and radiation instruments are designed and constructed

  13. The LHCb VELO Upgrade

    CERN Document Server

    de Capua, Stefano

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-3, will transform the experiment to a triggerless system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm, enabling the detector to run at luminosities of 2×1033 cm−2 s −1 . The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current strip detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will allow for fast pattern recognition and track reconstruction in the software trigger. The silicon pixel sensors have 55×55 µm2 pitch, and are read out by the VeloPix ASIC. The VeloPix builds on the currently available Timepix3, modified to deliver a radiation hard design capable of an order of magnitude increase in output rate. The hottest regions will have pixel hit rates of 900 Mhits/s, yielding a total data rate more than 3 Tbit/s for the upgraded VELO...

  14. Recent Upgrades and Extensions of the ASDEX Upgrade ECRH System

    Science.gov (United States)

    Wagner, Dietmar; Stober, Jörg; Leuterer, Fritz; Monaco, Francesco; Münich, Max; Schmid-Lorch, Dominik; Schütz, Harald; Zohm, Hartmut; Thumm, Manfred; Scherer, Theo; Meier, Andreas; Gantenbein, Gerd; Flamm, Jens; Kasparek, Walter; Höhnle, Hendrik; Lechte, Carsten; Litvak, Alexander G.; Denisov, Gregory G.; Chirkov, Alexey; Popov, Leonid G.; Nichiporenko, Vadim O.; Myasnikov, Vadim E.; Tai, Evgeny M.; Solyanova, Elena A.; Malygin, Sergey A.

    2011-03-01

    The multi-frequency Electron Cyclotron Heating (ECRH) system at the ASDEX Upgrade tokamak employs depressed collector gyrotrons, step-tunable in the range 105-140 GHz. The system is equipped with a fast steerable launcher allowing for remote steering of the ECRH RF beam during the plasma discharge. The gyrotrons and the mirrors are fully integrated in the discharge control system. The polarization can be controlled in a feed-forward mode. 3 Sniffer probes for millimeter wave stray radiation detection have been installed.

  15. How to implement all HL-LHC upgrades

    CERN Document Server

    Rossi, L; Ballarino, A; Brüning, O; Jensen, E; Redaelli, S; Tavian, L; Todesco, E

    2014-01-01

    The luminosity upgrade will require major changes in the LHC machine layout : about 1.2 km of the machine will undergo major renova tion or modification. In the paper we will review the list of main equipment foreseen to be replaced or to be added. We will review the upgrade plan that should start already in the Long Shutdown (LS) 2 (with the installation of the first dispersion suppressor 11T dipole – collimator unit , the superconducting link in Point 7 and the cryo-plant in Point 4), through to the major works in LS3, synchronized with an upgrade of the LHC detectors. Best estimates of the required duration of the various shutdowns will be discussed, and also the main risks and their mitigation.

  16. Upgraded wood residue fuels 1995

    International Nuclear Information System (INIS)

    Vinterbaeck, J.

    1995-01-01

    The Swedish market for upgraded residue fuels, i.e. briquettes, pellets and wood powder, has developed considerably during the nineties. The additional costs for the upgrading processes are regained and create a surplus in other parts of the system, e.g. in the form of higher combustion efficiencies, lower investment costs for burning equipment, lower operation costs and a diminished environmental impact. All these factors put together have resulted in a rapid growth of this part of the energy sector. In 1994 the production was 1.9 TWh, an increase of 37 % compared to the previous year. In the forthcoming heating season 1995/96 the production may reach 4 TWh. 57 refs, 11 figs, 6 tabs

  17. Anesthetic equipment, facilities and services available for pediatric ...

    African Journals Online (AJOL)

    2011-04-09

    Apr 9, 2011 ... standards and increased use of disposable anesthetic equipment. An audit of equipment and facilities for anesthetic care in pediatric patients is important and should be carried out periodically to appraise the situation for upgrading of essential anesthetic facilities and equipment. Appendix A. 18th March, ...

  18. Upgrade of the computer-based information systems on USNRC simulators

    International Nuclear Information System (INIS)

    Griffin, J.I.

    1998-01-01

    In late 1995, the U.S. Nuclear Regulatory Commission (USNRC) began a project to upgrade the computer-based information systems on its BWR/6 and BandW Simulators. The existing display generation hardware was very old and in need of replacement due to difficulty in obtaining spare parts and technical support. In addition, the display systems used currently each require a SEL 32/55 computer system, which is also obsolete, running the Real Time Monitor (RTM) operating system. An upgrade of the display hardware and display generation systems not only solves the problem of obsolescence of that equipment but also allows removal of the 32/55 systems. These computers are used only to support the existing display generation systems. Shortly after purchase of the replacement equipment, it was learned that the vendor was no longer going to support the methodology. Instead of implementing an unsupported concept, it was decided to implement the display systems upgrades using the Picasso-3 UIMS (User Interface Management System) and the purchased hardware. This paper describes the upgraded display systems for the BWR/6 and BandW Simulators, including the design concept, display development, hardware requirements, the simulator interface software, and problems encountered. (author)

  19. Developments towards the LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Cid Vidal, Xabier, E-mail: xabier.cid.vidal@cern.ch

    2016-09-21

    The Vertex Locator (VELO) is a silicon strip detector surrounding the interaction region of the LHCb experiment. The upgrade of the VELO is planned to be installed in 2019–2020, and the current detector will be replaced by a hybrid pixel system equipped with electronics capable of reading out at a rate of 40 MHz. The new detector is designed to withstand the radiation dose expected at an integrated luminosity of 50 fb{sup −1}. The detector will be composed of silicon pixel sensors, read out by the VeloPix ASIC that is being developed based on the TimePix/MediPix family. The prototype sensors for the VELO upgrade are being irradiated in five different facilities and the post-irradiation performance is being measured with testbeams, and in the lab. These proceedings present the VELO upgrade and briefly discuss the results of the sensor testing campaign. - Highlights: • The VELO is the detector surrounding the LHCb collision point. • After its upgrade, the VELO will be capable of reading out at a rate of 40 MHz. • The detector will be composed of Si pixel sensors, read out by the VeloPix ASIC. • The irradiated prototype sensors for the VELO upgrade are currently being tested.

  20. Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    Energy Technology Data Exchange (ETDEWEB)

    Wiehagen, J. [Partnership for Home Innovation, Upper Marlboro, MD (United States); Del Bianco, M. [Partnership for Home Innovation, Upper Marlboro, MD (United States); Mallay, D. [Partnership for Home Innovation, Upper Marlboro, MD (United States)

    2015-05-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. It presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements.

  1. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  2. The LANSCE RICE control system upgrade.

    Energy Technology Data Exchange (ETDEWEB)

    Oothoudt, Michael; Schaller, S. (Stuart); Bjorklund, E. A. (Eric A.); Burns, M. J. (Mary J.); Carr, G. (Gary); Carr, G. (Gary); Faucett, John Allen,; Hayden, D. J. (David J.); Lusk, M. D. (Matthew D.); Merl, R. B. (Robert B.); Potter, J. M. (Jerry M.); Reynolds, J. A. (Jerome A.); Romero, D. B. (Dolores B.); Shelley, F. E. (Fred E.)

    2003-01-01

    The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem. The RICE subsystem upgrade is a challenge because of its technology (late 1960s), number of channels (>10,000), and unique characteristics (all-modules data takes, timed/flavored data takes). The plan is to replace at least the non-timed data and the command portions of the subsystem with Programmable Logic Controllers (PLCs). We discuss motivations, technological challenges, proof-of-principle, and planning. The boundary condition, as usual, is that we must implement these major changes on a running accelerator.

  3. The LANSCE RICE control system upgrade

    International Nuclear Information System (INIS)

    Oothoudt, Michael; Schaller, S.; Bjorklund, E.A.; Burns, M.J.; Carr, G.; Faucett, John Allen; Hayden, D.J.; Lusk, M.D.; Merl, R.B.; Potter, J.M.; Reynolds, J.A.; Romero, D.B.; Shelley, F.E.

    2003-01-01

    The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem. The RICE subsystem upgrade is a challenge because of its technology (late 1960s), number of channels (>10,000), and unique characteristics (all-modules data takes, timed/flavored data takes). The plan is to replace at least the non-timed data and the command portions of the subsystem with Programmable Logic Controllers (PLCs). We discuss motivations, technological challenges, proof-of-principle, and planning. The boundary condition, as usual, is that we must implement these major changes on a running accelerator.

  4. LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hennessy, Karol

    2017-02-11

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1}. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have 55×55 μm{sup 2} pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The foil will be manufactured through milling and possibly thinned further by chemical etching. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates. The current status of the VELO upgrade is described and latest results from operation of irradiated sensor assemblies are presented.

  5. MPC and A upgrades at the Institute of Theoretical and Experimental Physics (ITEP)

    International Nuclear Information System (INIS)

    Haase, M.; Smarto, C.; Baumann, M.

    1998-01-01

    Materials Protection, Control and Accounting (MPC and A) equipment upgrades are complete at the Institute of Theoretical and Experimental Physics (ITEP), a site that has significant quantities of weapons-potential nuclear materials. Cooperative work was initiated at this Moscow facility as a part of the US-Russian program to upgrade MPC and A systems. An initial site visit and assessment were conducted in September 1996 to establish communication between ITEP, the US Department of Energy (DOE), and participating US National Laboratories. Subsequently, an agreement was reached to develop two master plans for MPC and A upgrades. Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) assisted in developing a plan for Material Control and Accounting (MC and A) upgrades, and Sandia National Laboratories (SNL) assisted in developing a plan for Physical Protection System (PPS) upgrades. The MC and A plan included MC and A training, a mass measurement program, nondestructive assay instrumentation, item identification (bar coding), physical inventory taking, portal and hand-held nuclear material monitors, and a nuclear materials accounting system. The PPS plan included basic PPS design training, Central Alarm Station (CAS) relocation and equipment upgrades, a site and critical-building access control system, intrusion detection, alarm assessment, and guard force communications

  6. Upgrading of the LGD cluster at JINR to support DLNP experiments

    Science.gov (United States)

    Bednyakov, I. V.; Dolbilov, A. G.; Ivanov, Yu. P.

    2017-01-01

    Since its construction in 2005, the Computing Cluster of the Dzhelepov Laboratory of Nuclear Problems has been mainly used to perform calculations (data analysis, simulation, etc.) for various scientific collaborations in which DLNP scientists take an active part. The Cluster also serves to train specialists. Much has changed in the past decades, and the necessity has arisen to upgrade the cluster, increasing its power and replacing the outdated equipment to maintain its reliability and modernity. In this work we describe the experience of performing this upgrading, which can be helpful for system administrators to put new equipment for clusters of this type into operation quickly and efficiently.

  7. Upgrading of TREAT experimental capabilities

    International Nuclear Information System (INIS)

    Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

    1982-01-01

    The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system

  8. EBR-II Cover Gas Cleanup System (CGCS) upgrade graphical interface design

    International Nuclear Information System (INIS)

    Staffon, J.D.; Peters, G.G.

    1992-01-01

    Technology advances in the past few years have prompted an effort at Argonne National Laboratory to replace existing equipment with high performance digital computers and color graphic displays. Improved operation of process systems can be achieved by utilizing state-of-the-art computer technology in the areas of process control and process monitoring. The Cover Gas Cleanup System (CGCS) at EBR-II is the first system to be upgraded with high performance digital equipment. The upgrade consisted of a main control computer, a distributed control computer, a front end input/output computer, a main graphics interface terminal, and a remote graphics interface terminal. This paper describes the main control computer and the operator interface control software

  9. Status of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.; Rutherford, B.

    1992-01-01

    Certain components of the ATLAS control system are two generations behind today's technology. It has been decided to upgrade the control system. in part, by replacing Digital Equipment Corporation (DEC) PDP-11 computers with present-day VAX technology. Two primary goals have been defined for the upgraded control system. The first of these goals is to keep additional ''in-house'' written software to a minimum, while providing the portability necessary to ensure the continued use of existing software. In an attempt to achieve this goal, commercially-available software has been utilized to provide a foundation for the final control-system configuration. The second goal is to develop the new control system, while not interfering with accelerator operations. This paper describes some of the motivation for upgrading the ATLAS control system, the basic features of the new control system, and the present status of the system's development

  10. Safety upgrades to the NRU research reactor

    International Nuclear Information System (INIS)

    DeAbreu, B.; Mark, J.M.; Mutterback, E.J.

    1998-01-01

    The NRU (National Research Universal) Reactor is a 135 MW thermal research facility located at Chalk River Laboratories, and is owned and operated by Atomic Energy of Canada Limited. One of the largest and most versatile research reactors in the world, it serves as the R and D workhorse for Canada's CANDU business while at the same time filling the role as one of the world's major producers of medical radioisotopes. AECL plans to extend operation of the NRU reactor to approximately the year 2005 when a new replacement, the Irradiation Research Facility (IRF) will be available. To achieve this, AECL has undertaken a program of safety reassessment and upgrades to enhance the level of safety consistent with modem requirements. An engineering assessment/inspection of critical systems, equipment and components was completed and seven major safety upgrades are being designed and installed. These upgrades will significantly reduce the reactor's vulnerability to common mode failures and external hazards, with particular emphasis on seismic protection. The scheduled completion date for the project is 1999 December at a cost approximately twice the annual operating cost. All work on the NRU upgrade project is planned and integrated into the regular operating cycles of the reactor; no major outages are anticipated. This paper describes the safety upgrades and discusses the technical and managerial challenges involved in extending the operating life of the NRU reactor. (author)

  11. Seismic assessment and upgrading of nuclear power plants in Eastern Europe

    Energy Technology Data Exchange (ETDEWEB)

    Katona, T; Kostov, M

    1997-03-01

    The basic findings of the seismic re-qualification programmes going on recently at all VVER plants in Eastern Europe can be summarised. The problems of the seismic safety have to be solved taking into account the general concept of the nuclear safety enhancement of the units. There are cases where the system improvements lead to better and more effective solution of the problem than the structural upgrading. The equipment and piping of the primary system have sufficient capacity. The viscous dampers are considered usually for the upgrading. The equipment anchorage especially the electrical and I and C equipment anchorage have to be upgraded. There are general consideration for replacement of the hydraulic snubbers by viscous dampers in the primary circuit of the VVER 440/V230. The considerations are not only because of the better seismic behaviour but mainly because of the better operational performance. There is relatively good seismic instrumentation at the plants considered. The definition of the scram level of the units not designed for an OBE is an essential problem. More effort needed for the definition of this level on the basis of re-evaluation experience of the plant equipment and after the proper definition of post-earthquake activities. The seismic re-evaluation and re-qualification of the VVER units is a general safety issue in Easter European countries. This rather complex problem can be solved adopting the experience, methods and requirements of western countries and taking into account the design features of the VVER units as well as the as built and as it is conditions. (J.P.N.)

  12. Seismic assessment and upgrading of nuclear power plants in Eastern Europe

    International Nuclear Information System (INIS)

    Katona, T.; Kostov, M.

    1997-01-01

    The basic findings of the seismic re-qualification programmes going on recently at all VVER plants in Eastern Europe can be summarised. The problems of the seismic safety have to be solved taking into account the general concept of the nuclear safety enhancement of the units. There are cases where the system improvements lead to better and more effective solution of the problem than the structural upgrading. The equipment and piping of the primary system have sufficient capacity. The viscous dampers are considered usually for the upgrading. The equipment anchorage especially the electrical and I and C equipment anchorage have to be upgraded. There are general consideration for replacement of the hydraulic snubbers by viscous dampers in the primary circuit of the VVER 440/V230. The considerations are not only because of the better seismic behaviour but mainly because of the better operational performance. There is relatively good seismic instrumentation at the plants considered. The definition of the scram level of the units not designed for an OBE is an essential problem. More effort needed for the definition of this level on the basis of re-evaluation experience of the plant equipment and after the proper definition of post-earthquake activities. The seismic re-evaluation and re-qualification of the VVER units is a general safety issue in Easter European countries. This rather complex problem can be solved adopting the experience, methods and requirements of western countries and taking into account the design features of the VVER units as well as the as built and as it is conditions. (J.P.N.)

  13. Fire protection upgrading of four Russian 440/230 VVER units

    International Nuclear Information System (INIS)

    Corsini, G.; Yelfimov, S.

    1995-01-01

    The main goal of TACIS 3.6 a project funded by the Commission of the European Communities (CEC), was the front-end engineering for upgrading the Fire Protection System (FPS) of the safety-related equipment of Novovoronezh, Units 3 and 4, and Kola, Units 1 and 2, VVER 440/230 nuclear power plants. As a first step, all the safety-related equipment had to be identified, evaluation criteria had to be established and the existing FPS reviewed against the criteria. In the second step, the selection of the upgrading measures, depending on feasibility and cost estimate, has been accomplished, room by room. The third step, carried out on schedule and completed end July 95, has been essentially the preparation of the Technical Specifications for procurement of the needed equipment including remaining detail engineering. The Russian sub-contactor Atom Energo Project (AEP), who have been the designers of these older NPP s, have done the work with the Italian Ansaldo as the consultants of their Russian colleagues. Practical aspects of the engineering work are discussed and examples of improvements selected for retrofitting described. (author)

  14. Economic analysis for upgrade decision-making using a control system replacement example

    International Nuclear Information System (INIS)

    De Grosbois, J.; Wichman, R.; Hepburn, G.A.; Basso, R.; Kumar, V.; Deregowska, D.

    2006-01-01

    This paper (3rd in a CNS series) provides insight on how nuclear power plants can achieve better efficiencies and reduced operations and maintenance (O and M) costs by making well-informed equipment upgrade decisions. An investment decision in a plant system upgrade will have various technical options and associated performance outcomes. These can be modelled and evaluated using economic and financial analysis methods. The economic analysis usually involves a comparison of an investment scenario versus a no-investment scenario called difference case analysis. The investment may include several scenarios due to the existence of various options, different investment timings, or desired performance results. Classical approaches, using financial tools such as net present value and internal rate of return calculations, may be used to quantify the financial benefits of the difference cases when certainty about the outcomes is assumed. When making decisions under risk, the classical approaches may be augmented with methods that consider life-cycle costs and benefits, the cost consequences of and probability of equipment failure, the timing of the replacement, and the uncertainties in estimating costs and benefits. The use of expected value and Monte Carlo simulation, among others, allow the incorporation of financial and technical uncertainty into the analysis. Finally, sensitivity analysis enables better understanding of the problem and may improve the decision and clarify the level of confidence that should be put in the outcomes. This paper illustrates the use of financial decision analysis methods for equipment replacements using a control system upgrade example. These methods may easily be generalized for other types of plant upgrades. (author)

  15. Developing Major Steps for a Feasibility Study for Upgrading I and C Systems in a Large Scale for an Operating Nuclear Power Plant

    International Nuclear Information System (INIS)

    Suh, Yong Suk; Keum, Jong Yong; Kim, Dong Hoon; Kang, Hyeon Tae; Sung, Chan Ho; Lee, Jae Ki; Cho, Chang Hwan

    2009-01-01

    According to the IAEA report as of Jan. 2008, 436 nuclear power reactors are in operation over the world and 368 nuclear power reactors exceed their operating ages by 20 years. The average I and C equipment's life span is 20 years comparing with that the average reactor's life time is 40 to 60 years. This means that a reactor must be faced with I and C equipment obsolescence problems once or twice during its operating years. The I and C equipment is replaced with new equipment only when the obsolescence problem occurs in a nuclear power plant. This is called an equipment basis upgrade in this paper. This replacement is such a general practice that occurs only when needed. We can assume that most of I and C equipment of a plant will meet with the obsolescence problem almost same time since it started operating. Although there must be a little time difference in the occurrence of the problems among I and C equipment, the replacement will be required in consecutive years. With this assumption, it is recommendable to upgrade the equipment, which is to meet with the problem at the same time, with new equipment at the same time. This is called a system basis upgrade in this paper. The system-basis replacement can be achieved in a large scale by coupling systems whose functions are related each other and replacing them together with a new upto- date platform. This paper focuses on the large scale upgrade of I and C systems for existing and operating NPPs. While performing a feasibility study for the large scale upgrade for Korea standard nuclear power plants (KSNPs), six major steps are developed for the study. This paper is to present what to perform in each step

  16. Upgrade of the cryogenic infrastructure of SM18, CERN main test facility for superconducting magnets and RF cavities

    Science.gov (United States)

    Perin, A.; Dhalla, F.; Gayet, P.; Serio, L.

    2017-12-01

    SM18 is CERN main facility for testing superconducting accelerator magnets and superconducting RF cavities. Its cryogenic infrastructure will have to be significantly upgraded in the coming years, starting in 2019, to meet the testing requirements for the LHC High Luminosity project and for the R&D program for superconducting magnets and RF equipment until 2023 and beyond. This article presents the assessment of the cryogenic needs based on the foreseen test program and on past testing experience. The current configuration of the cryogenic infrastructure is presented and several possible upgrade scenarios are discussed. The chosen upgrade configuration is then described and the characteristics of the main newly required cryogenic equipment, in particular a new 35 g/s helium liquefier, are presented. The upgrade implementation strategy and plan to meet the required schedule are then described.

  17. A demonstrated method for upgrading existing control room interiors

    International Nuclear Information System (INIS)

    Brice, R.M.; Terrill, D.; Brice, R.M.

    1991-01-01

    The main control room (MCR) of any nuclear power plant can justifiably be called the most important area staffed by personnel in the entire facility. The interior workstation configuration, equipment arrangement, and staff placement all affect the efficiency and habitability of the room. There are many guidelines available that describe various human factor principles to use when upgrading the environment of the MCR. These involve anthropometric standards and rules for placement of peripheral equipment. Due to the variations in plant design, however, hard-and-fast rules have not and cannot be standardized for retrofits in any significant way. How then does one develop criteria for the improvement of a MCR? The purpose of this paper is to discuss, from the designer's point of view, a method for the collection of information, development of criteria, and creation of a final design for a MCR upgrade. This method is best understood by describing the successful implementation at Tennessee Valley Authority's Sequoyah nuclear plant

  18. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  19. Upgrading elastomer seals for nuclear service

    Energy Technology Data Exchange (ETDEWEB)

    Wittich, K C; Wensel, R; LaRose, R; Kuran, S

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs.

  20. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; LaRose, R.; Kuran, S.

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs

  1. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; Larose, R.; Kuran, S.

    1998-01-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussion with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author)

  2. Plant-wide integrated equipment monitoring and analysis system

    International Nuclear Information System (INIS)

    Morimoto, C.N.; Hunter, T.A.; Chiang, S.C.

    2004-01-01

    A nuclear power plant equipment monitoring system monitors plant equipment and reports deteriorating equipment conditions. The more advanced equipment monitoring systems can also provide information for understanding the symptoms and diagnosing the root cause of a problem. Maximizing the equipment availability and minimizing or eliminating consequential damages are the ultimate goals of equipment monitoring systems. GE Integrated Equipment Monitoring System (GEIEMS) is designed as an integrated intelligent monitoring and analysis system for plant-wide application for BWR plants. This approach reduces system maintenance efforts and equipment monitoring costs and provides information for integrated planning. This paper describes GEIEMS and how the current system is being upgraded to meet General Electric's vision for plant-wide decision support. (author)

  3. The DIII-D cryogenic system upgrade

    International Nuclear Information System (INIS)

    Schaubel, K.M.; Laughon, G.J.; Campbell, G.L.; Langhorn, A.R.; Stevens, N.C.; Tupper, M.L.

    1993-10-01

    The original DIII-D cryogenic system was commissioned in 1981 and was used to cool the cryopanel arrays for three hydrogen neutral beam injectors. Since then, new demands for liquid helium have arisen including: a fourth neutral beam injector, ten superconducting magnets for the electron cyclotron heating gyrotrons, and more recently, the advanced diverter cryopump which resides inside the tokamak vacuum vessel. The original cryosystem could not meet these demands. Consequently, the cryosystem was upgraded in several phases to increase capacity, improve reliability, and reduce maintenance. The majority of the original system has been replaced with superior equipment. The capacity now exists to support present as well as future demands for liquid helium at DIII-D including a hydrogen pellet injector, which is being constructed by Oak Ridge National Laboratory. Upgrades to the cryosystem include: a recently commissioned 150 ell/hr helium liquefier, two 55 g/sec helium screw compressors, a fully automated 20-valve cryogen distribution box, a high efficiency helium wet expander, and the conversion of equipment from manual or pneumatic to programmable logic controller (PLC) control. The distribution box was designed and constructed for compactness due to limited space availability. Overall system efficiency was significantly improved by replacing the existing neutral beam reliquefier Joule-Thomson valve with a reciprocating wet expander. The implementation of a PLC-based automatic control system has resulted in increased efficiency and reliability. This paper will describe the cryosystem design with emphasis on newly added equipment. In addition, performance and operational experience will be discussed

  4. The DIII-D cryogenic system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Schaubel, K.M.; Laughon, G.J.; Campbell, G.L.; Langhorn, A.R.; Stevens, N.C.; Tupper, M.L.

    1993-10-01

    The original DIII-D cryogenic system was commissioned in 1981 and was used to cool the cryopanel arrays for three hydrogen neutral beam injectors. Since then, new demands for liquid helium have arisen including: a fourth neutral beam injector, ten superconducting magnets for the electron cyclotron heating gyrotrons, and more recently, the advanced diverter cryopump which resides inside the tokamak vacuum vessel. The original cryosystem could not meet these demands. Consequently, the cryosystem was upgraded in several phases to increase capacity, improve reliability, and reduce maintenance. The majority of the original system has been replaced with superior equipment. The capacity now exists to support present as well as future demands for liquid helium at DIII-D including a hydrogen pellet injector, which is being constructed by Oak Ridge National Laboratory. Upgrades to the cryosystem include: a recently commissioned 150 {ell}/hr helium liquefier, two 55 g/sec helium screw compressors, a fully automated 20-valve cryogen distribution box, a high efficiency helium wet expander, and the conversion of equipment from manual or pneumatic to programmable logic controller (PLC) control. The distribution box was designed and constructed for compactness due to limited space availability. Overall system efficiency was significantly improved by replacing the existing neutral beam reliquefier Joule-Thomson valve with a reciprocating wet expander. The implementation of a PLC-based automatic control system has resulted in increased efficiency and reliability. This paper will describe the cryosystem design with emphasis on newly added equipment. In addition, performance and operational experience will be discussed.

  5. Upgrading BWR training simulators for annual outage operation training

    International Nuclear Information System (INIS)

    Yamakabe, K.; Nakajima, A.; Shiyama, H.; Noji, K.; Okabe, N.; Murata, F.

    2006-01-01

    Based upon the recently developed quality assurance program by the Japanese electric companies, BWR Operator Training Center (BTC) identified the needs to enhance operators' knowledge and skills for operations tasks during annual outage, and started to develop a dedicated operator training course specialized for them. In this paper, we present the total framework of the training course for annual outage operations and the associated typical three functions of our full-scope simulators specially developed and upgraded to conduct the training; namely, (1) Simulation model upgrade for the flow and temperature behavior concerning residual heat removal (RHR) system with shutdown cooling mode, (2) Addition of malfunctions for DC power supply equipment, (3) Simulation model upgrade for water filling operation for reactor pressurization (future development). We have implemented a trial of the training course by using the upgraded 800MW full-scope training simulator with functions (1) and (2) above. As the result of this trial, we are confident that the developed training course is effective for enhancing operators' knowledge and skills for operations tasks during annual outage. (author)

  6. Upgraded wood residue fuels 1995; Foeraedlade traedbraenslen 1995

    Energy Technology Data Exchange (ETDEWEB)

    Vinterbaeck, J [Swedish Univ. of Agricultural Science, Uppsala (Sweden). Dept. of Forest-Industry-Market Studies

    1995-11-01

    The Swedish market for upgraded residue fuels, i.e. briquettes, pellets and wood powder, has developed considerably during the nineties. The additional costs for the upgrading processes are regained and create a surplus in other parts of the system, e.g. in the form of higher combustion efficiencies, lower investment costs for burning equipment, lower operation costs and a diminished environmental impact. All these factors put together have resulted in a rapid growth of this part of the energy sector. In 1994 the production was 1.9 TWh, an increase of 37 % compared to the previous year. In the forthcoming heating season 1995/96 the production may reach 4 TWh. 57 refs, 11 figs, 6 tabs

  7. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  8. NCSU PULSTAR reactor instrumentation upgrade. Final technical report, September 6, 1990--March 19, 1993

    International Nuclear Information System (INIS)

    Bilyj, S.J.; Perez, P.B.

    1993-01-01

    The Nuclear Reactor Program at North Carolina State University initiated an upgrade program at the NCSU PULSTAR Reactor in 1990. Twenty-year-old instrumentation is currently undergoing replacement with solid-state and current technology equipment. The financial assistance from the United States Department of Energy has been the primary source of support. This report provides the status of the first two phases of the upgrade program

  9. Upgrades of Hanford Engineering Development Laboratory hot cell facilities

    International Nuclear Information System (INIS)

    Daubert, R.L.; DesChane, D.J.

    1987-01-01

    The Hanford Engineering Development Laboratory operates the 327 Postirradiation Testing Laboratory (PITL) and the 324 Shielded Materials Facility (SMF). These hot cell facilities provide diverse capabilities for the postirradiation examination and testing of irradiated reactor fuels and materials. The primary function of these facilities is to determine failure mechanisms and effects of irradiation on physical and mechanical properties of reactor components. The purpose of this paper is to review major equipment and facility upgrades that enhance customer satisfaction and broaden the engineering capabilities for more diversified programs. These facility and system upgrades are providing higher quality remote nondestructive and destructive examination services with increased productivity, operator comfort, and customer satisfaction

  10. The LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Dosil Suárez, Álvaro, E-mail: alvaro.dosil@usc.es

    2016-07-11

    The upgrade of the LHCb experiment, planned for 2019, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm. The upgraded detector will run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1} and probe physics beyond the Standard Model in the heavy flavour sector with unprecedented precision. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The detector comprises silicon pixel sensors with 55×55 μm{sup 2} pitch, read out by the VeloPix ASIC, based on the TimePix/MediPix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The detector halves are retracted when the beams are injected and closed at stable beams, positioning the first sensitive pixel at 5.1 mm from the beams. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates.

  11. Re-use of Low Bandwidth Equipment for High Bit Rate Transmission Using Signal Slicing Technique

    DEFF Research Database (Denmark)

    Wagner, Christoph; Spolitis, S.; Vegas Olmos, Juan José

    : Massive fiber-to-the-home network deployment requires never ending equipment upgrades operating at higher bandwidth. We show effective signal slicing method, which can reuse low bandwidth opto-electronical components for optical communications at higher bit rates.......: Massive fiber-to-the-home network deployment requires never ending equipment upgrades operating at higher bandwidth. We show effective signal slicing method, which can reuse low bandwidth opto-electronical components for optical communications at higher bit rates....

  12. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  13. Upgrading and modernization of the high flux reactor Petten

    International Nuclear Information System (INIS)

    Ahlf, J.

    1992-01-01

    The High Flux Reactor (HFR) at Petten, The Netherlands, owned by the European Communities and operated by the Netherlands Energy Research Foundation, is a water-cooled and moderated, multipurpose research reactor of the closed-tank in-pool type, operated at 45 MW. Performance upgrading comprised two power increases from 20 MW via 30 MW to 45 MW, providing more and higher rated irradiation positions in the tank. With the replacement of the original reactor vessel the experimental capabilities of the reactor were improved. Better pool side facilities and the introduction of a large cross-section, double, beam tube were implemented. Additional major installation upgrading activities consisted of the replacement of the primary and the pool heat exchangers, replacement of the beryllium reflector elements, extension of the overpower protection systems and upgrading of the nuclear instrumentation as well as the guaranteed power supply. Control room upgrading is in progress. A full new safety analysis, as well as the introduction of a comprehensive Quality Assurance system, are summarized under software upgrading. Continuous modernization and upgrading also takes place of equipment for fuel and structural materials irradiations for fission reactors and future fusion machines. In parallel, all supporting services, as well as the management structure for large irradiation programmes, have been developed. Presently the reactor is operating at about 275 full power days per year with an average utilization of the irradiation positions of 70 to 80%. (orig.)

  14. Fuel Handling Equipment Maintenance for Critical Path Time Savings

    Energy Technology Data Exchange (ETDEWEB)

    Saville, M.; Williams, A.

    2015-07-01

    By sharing lessons learned and operating experience gained by AREVA Stearns RogerTM Services from more than 45 years of servicing, maintaining, and upgrading Fuel Handling Equipment (FHE) and as the original equipment manufacturer to 56% of domestic U.S. FHE (PWR and BWR) as well as 19 units overseas, this paper presents trends and market forces that have led to the neglect of FHE, the risks of not adequately maintaining FHE, and the financial benefits of proactively maintaining FHE. The benefit to audiences is to come to a better understanding of how critical path delays can be avoided and thus reduce nuclear power plant operating costs. Note that statistics and monetary values given herein are based on recent typical experiences of AREVA Stearns RogerTM Services. Examples discussed are based on actual lessons learned. For the purposes of this paper, upgrades are considered a part of equipment maintenance unless specifically discussed separately. (Author)

  15. Progress in MPC and A upgrades at Luch

    International Nuclear Information System (INIS)

    Mizin, P.; Chukov, V.; Rogatchev, V.; Curtiss, J.; Erkkila, B.; Goodey, K.; Hembree, D. Jr.; Lowe, D.; Turner, C.

    1997-01-01

    Luch, a MINATOM facility, has been engaged in both scientific research and uranium processing for fifty years. Since the spring of 1996, Luch has participated in a program of US/Russia Cooperation in Nuclear MPC and A Upgrades. The program began with planning for immediate upgrades in MPC and A, with en emphasis on physical protection. In addition, US and Luch experts exchanged technical data during a number of workshops, to establish a common understanding of available MPC and A tools and equipment. Site characterizations and vulnerability assessments were then prepared by Luch, to form the basis for the current program of methodical upgrades in all areas of MPC and A. Access control, alarms and alarm communications are being improved as part of this program. Control of nuclear material is being enhanced through improvements in material monitoring and in transportation security when nuclear material is moved between buildings on the Luch site. A comprehensive, site-wide computer network for Luch was designed during a recent workshop. Acquiring and installing this computer system, complete with COREMAS software, is currently in progress. Nuclear material analysis will be improved through NDA techniques using Canberra InSpector systems. The planned upgrades in nuclear MPC and A will reinforce safeguards over large quantities of HEU at Luch

  16. Plant control system upgrades in the context of industry trends towards plant life-extension

    International Nuclear Information System (INIS)

    De Grosbois, J.; Basso, R.; Hepburn, A.; Kumar, V.

    2002-01-01

    Domestic CANDU nuclear plants were brought online between 1972 and 1986. Over the next decade, most of these stations will be nearing the end of their designed operating life. Effort has traditionally been placed on ensuring that the existing installed plant control system equipment could operate reliably until the end of this design life. Until recently, little attention has been given to plant control system upgrades or replacements to meet the expected requirement for 30+ years of additional plant operation following potential plant refurbishments. Industry developments are changing this thinking. The combination of expected increases in electricity demand (and prices), and the many recent successful turnaround stories of U.S. nuclear power plants has resulted in new interest in plant life improvement and plant life extension programs. Plant control system upgrade decisions are now being driven by the need to replace or upgrade these systems to support plant life extension. This article is the first of several that investigate aspects of plant control system upgrades or replacement, specifically in the context of the CANDU station digital control computers (DCCs). It sets the context for the discussion in the subsequent articles by providing a brief review of industry trends favouring plant refurbishment, by outlining the basic issues of aging and obsolescence of control system equipment, by establishing the need for upgrades and replacements, and by introducing some of the basic challenges to be addressed by the industry as it moves forward. (author)

  17. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  18. Micro-NRA and micro-3HIXE with He-3 microbeam on samples exposed in ASDEX Upgrade and Pilot-PSI machines

    NARCIS (Netherlands)

    Kelemen, M.; Zaloznik, A.; Vavpetic, P.; Pecovnik, M.; Pelicon, P.; Hakola, A.; Lahtinen, A.; Karhunen, J.; Piip, K.; van der Meiden, H. J.; Paris, P.; Laan, M.; Krieger, K.; Oberkofler, M.; Markelj, S.; ASDEX Upgrade team,

    2017-01-01

    Micro nuclear reaction analysis (micro-NRA) exploiting the nuclear reaction D(He-3,p)He-4 was used for post-mortem analyses of special marker samples, exposed to deuterium plasma inside ASDEX Upgrade (AUG) tokamak and to the deuterium plasma jet in the Pilot-PSI linear plasma gun. Lateral

  19. Upgrade of the NCSU PULSTAR instrumentation power channels. Final technical report, September 1, 1992 - August 31, 1994

    International Nuclear Information System (INIS)

    Perez, P.B.

    1998-01-01

    The Nuclear Reactor Program at North Carolina State University initiated an upgrade program at the NCSU PULSTAR Reactor in 1990. The originally supplied instrumentation has been replaced with solid-state and current technology equipment. The financial assistance from the US Department of Energy has been the primary source of support. This is the final report for the Instrumentation Upgrade

  20. Recent achievements of the ATLAS upgrade Planar Pixel Sensors R and D project

    International Nuclear Information System (INIS)

    Casse, G

    2014-01-01

    The ATLAS upgrade Planar Pixel Sensors (PPS) project aims to prove the suitability of silicon detectors processed with planar technology to equip all layers of the pixel vertex detector proposed for the upgrade of the ATLAS experiment for the future High Luminosity LHC at CERN (HL-LHC). The detectors need to be radiation tolerant to the extreme fluences expected to be received during the experimental lifetime, with optimised geometry for full coverage and high granularity and affordable in term of cost, due to the relatively large area of the upgraded ATLAS detector system. Here several solutions for the detector geometry and results with radiation hard technologies (n-in-n, n-in-p) are discussed

  1. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  2. ALICE upgrades its powerful eyes

    CERN Multimedia

    Yuri Kharlov, ALICE Collaboration

    2013-01-01

    The ALICE Photon Spectrometer (PHOS) is a high-resolution photon detector that measures the photons coming out of the extremely hot plasma created in the lead-lead collisions at the LHC. Taking advantage of the long accelerator shut-down, the ALICE teams are now repairing and upgrading the existing modules and getting ready to install the brand-new module in time for the next run. The upgraded PHOS detector will be faster and more stable with wider acceptance and improved photon identification.   PHOS crystal matrix during repair. The key feature and the main complexity of the ALICE PHOS detector is that it operates at a temperature of -25°C, which makes it the second-coldest equipment element at the LHC after the cryogenic superconducting magnets. Since 2009 when it was installed, the PHOS detector, with its cold and warm volumes, has been immersed in airtight boxes to avoid condensation in the cold volumes. The 10,752 lead tungstate crystals of the PHOS were completely insulated fr...

  3. New Equipping Strategies for Combat Support Hospitals

    Science.gov (United States)

    2010-01-01

    Combat and Doctrine Development and COL Timothy Lamb , supported by MAJ Gary Cooper, included members of our team in visits to Sierra Army Depot and...aspect of improving materiel stew - ardship is improving the quality of data related to the procurement, maintenance, and upgrading of equipment

  4. A safety equipment list for rotary mode core sampling systems operation in single shell flammable gas tanks

    International Nuclear Information System (INIS)

    SMALLEY, J.L.

    1999-01-01

    This document identifies all interim safety equipment to be used for rotary mode core sampling of single-shell flammable gas tanks utilizing Rotary Mode Core Sampling systems (RMCS). This document provides the safety equipment for RMCS trucks HO-68K-4600, HO-68K-4647, trucks three and four respectively, and associated equipment. It is not intended to replace or supersede WHC-SD-WM-SEL-023, (Kelly 1991), or WHC-SD-WM-SEL-032, (Corbett 1994), which classifies 80-68K-4344 and HO-68K-4345 respectively. The term ''safety equipment'' refers to safety class (SC) and safety significant (SS) equipment, where equipment refers to structures, systems and components (SSC's). The identification of safety equipment in this document is based on the credited design safety features and analysis contained in the Authorization Basis (AB) for rotary mode core sampling operations in single-shell flammable gas tanks. This is an interim safety classification since the AB is interim. This document will be updated to reflect the final RMCS equipment safety classification designations upon completion of a final AB which will be implemented with the release of the Final Safety Analysis Report (FSAR)

  5. Upgraded Features of Newly Constructed Fuel Assembly Mechanical Characterization Test Facility in KAERI

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kang Hee; Kang, Heung Seok; Yoon, Kyung Ho; Kim, Hyung Kyu; Lee, Young Ho; Kim, Soo Ho; Yang, Jae Ho [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Fuel assembly mechanical characterization test facility (FAMeCT) in KAERI is newly constructed with upgraded functional features such as increased loading capacity, under-water vibration testing and severe earthquake simulation for extended fuel design guideline. The facility building is compactly designed in the scale of 3rd floor building and has regions for assembly-wise mechanical test equipment, dynamic load (seismic) simulating test system, small scale hydraulic loop and component wise test equipment. Figure 1 shows schematic regional layout of the facility building. Mechanical test platform and system is designed to increase loading capacity for axial compression test. Structural stability of the support system of new upper core plate simulator is validated through a limit case functional test. Fuel assembly mechanical characterization test facility in KAERI is newly constructed and upgraded with advanced functional features such as uprated loading capacity, under-water vibration testing and severe earthquake simulation for extended fuel design guideline. This paper briefly introduce the test facility construction and scope of the facility and is focused on the upgraded design features of the facility. Authors hope to facilitate the facility more in the future and collaborate with the industry.

  6. Upgrading activities for the HFR Petten

    International Nuclear Information System (INIS)

    Ahlf, J.

    1990-01-01

    The HFR in Petten, the Netherlands, is a water cooled and moderated research reactor. It has been in continuous and successful operation for more than 25 years. The reactor is utilized as a multi-purpose research reactor with a predominance of materials testing for fission and fusion energy. It has been continuous policy to keep the installation up to date by implementing technical developments and by refurbishing or replacing all components and equipment which approach the end of their useful life. In addition the facilities and the ancillary experimental equipment are continuously adapted and kept versatile in view of changing requirements from the experimental programmes. Performance upgrading comprised increasing the power in two steps to 30 MW and now 45 MW, accompanied by improving the core loading pattern in order to provide an increasing number of high flux irradiation positions. These improvements were rendered possible because of achievements in fuel element design and manufacture. In the mid 70's it became apparent that embrittlement of the reactor vessel material would become a licensing problem. A decision was taken to replace the old vessel by a new one which then could take into account recent experience with respect to experimental requirements. After the vessel replacement a programme was started to replace other ageing components. The primary heat exchangers and the pool heat exchanger have been replaced recently; replacement of the beryllium reflector is nearly finished. All the nuclear instrumentation channels have been replaced. Repair or refurbishment of peripheral equipment such as the outlet line for secondary cooling, the guaranteed power supply for the reactor and the fire prevention system is under preparation. Because all upgrading actions were carefully planned well in advance of actual component failures, unanticipated outages could be avoided

  7. The point of view of thermal equipment users; Le point de vue des gestionnaires d`equipements thermiques

    Energy Technology Data Exchange (ETDEWEB)

    Barroyer, P. [Compagnie Generale de Chauffe, 59 - Saint Andre Lez Lille (France)

    1997-12-31

    The influence of new pollution regulations in France on the operation of thermal equipment for central heating systems or industrial heat process systems, is examined. The main French regulations concerning air pollution control and energy rational consumption are reviewed, and their effects on the design, equipment, operation and costs of heat plants are discussed: impacts of the decree on upgrading and disposal of fossil fuel ashes, the decree on special protection zone (large cities), the clean air law, the compulsory declaration for classified combustion plants and limit air pollution emission levels

  8. Design/Operations review of core sampling trucks and associated equipment

    International Nuclear Information System (INIS)

    Shrivastava, H.P.

    1996-01-01

    A systematic review of the design and operations of the core sampling trucks was commissioned by Characterization Equipment Engineering of the Westinghouse Hanford Company in October 1995. The review team reviewed the design documents, specifications, operating procedure, training manuals and safety analysis reports. The review process, findings and corrective actions are summarized in this supporting document

  9. Structural seismic upgrading of NPPs in Czech and Slovak republics

    Energy Technology Data Exchange (ETDEWEB)

    David, M [DAVID Consulting, Engineering and Design Office, Prague (Czech Republic)

    1997-03-01

    Several Nuclear Power Plants of the VVER type has been constructed during the past years in former Czechoslovak Republic. Some of them has been already put in operation and some of them are under construction. Nuclear Power Plants V1(2 units of VVER 440/230), V2(2 units of VVER 440/213) in Slovak and NPP Dukovany (4 units of VVER 440/213) in Czech republic are in operation. NPP Mochovce (4 units of VVER 440/213) in Slovak and NPP Temelin (4 units reduced now to 2 units VVER 1000) have been already almost completed, but still under construction. All above cited NPPs have not been either explicitly designed against earthquake or the design against earthquake or its input data must be upgraded to be compatible with present requirements. The upgrading of seismic input as well the seismic upgrading of all structures and technological equipments for so many NPPs has involved a lot of comprehensive work in Czech as well as in Slovak republics. The upgrading cannot be completed in a short time and as a rule the seismic upgrading has been usually performed in several steps, beginning with the most important arrangements against seismic hazard. The basic principles and requirements for seismic upgrading has been defined in accordance with the international and particularly with the IAEA recommendations. About the requirements for seismic upgrading of NPPs in Czech and Slovak republics will be reported in other contribution. This contribution is dealing with the problems of seismic upgrading of NNPs civil engineering structures. The aim of this contribution is to point out some specific problems connected firstly with very complicated concept of Versa structures and secondly with the difficult task to increase the structural capacity to the required seismic level. (J.P.N.)

  10. Structural seismic upgrading of NPPs in Czech and Slovak republics

    International Nuclear Information System (INIS)

    David, M.

    1997-01-01

    Several Nuclear Power Plants of the VVER type has been constructed during the past years in former Czechoslovak Republic. Some of them has been already put in operation and some of them are under construction. Nuclear Power Plants V1(2 units of VVER 440/230), V2(2 units of VVER 440/213) in Slovak and NPP Dukovany (4 units of VVER 440/213) in Czech republic are in operation. NPP Mochovce (4 units of VVER 440/213) in Slovak and NPP Temelin (4 units reduced now to 2 units VVER 1000) have been already almost completed, but still under construction. All above cited NPPs have not been either explicitly designed against earthquake or the design against earthquake or its input data must be upgraded to be compatible with present requirements. The upgrading of seismic input as well the seismic upgrading of all structures and technological equipments for so many NPPs has involved a lot of comprehensive work in Czech as well as in Slovak republics. The upgrading cannot be completed in a short time and as a rule the seismic upgrading has been usually performed in several steps, beginning with the most important arrangements against seismic hazard. The basic principles and requirements for seismic upgrading has been defined in accordance with the international and particularly with the IAEA recommendations. About the requirements for seismic upgrading of NPPs in Czech and Slovak republics will be reported in other contribution. This contribution is dealing with the problems of seismic upgrading of NNPs civil engineering structures. The aim of this contribution is to point out some specific problems connected firstly with very complicated concept of Versa structures and secondly with the difficult task to increase the structural capacity to the required seismic level. (J.P.N.)

  11. Soft ware upgrade for Mobile Laboratories in Estonia, Latvia and Lithuania

    DEFF Research Database (Denmark)

    Bargholz, Kim; Andersen, Frank

    1998-01-01

    In July-August 1998 the soft ware for controlling the measurements in the mobile laboratories have been upgraded. The mobile laboratories are sponsored by Danish east aid projects in cooperation with Rotaray Denmark.The equipment used is 4 L NaI(Tl) detectors mounted on the roof of the cars toget...

  12. An upgrade practice of a double-rack source 60Co source irradiator

    International Nuclear Information System (INIS)

    Dong Hui; Peng Wei; Liu Zhaomin

    2009-01-01

    An upgrade practice of a double-rack irradiator with the design capacity of 2.96 x10 16 Bq (800 kCi) was reported. The detailed contents and characteristics of this upgrade, a comparison on the facility performance before and after the upgrade, and the cost-benefit analysis were carried out. After upgrade, the facility performance increased over 50%, and brought much directly economical benefit and indirectly economical benefit. The upgrade was successful, and set up a demonstrational sample. (authors)

  13. PTC test bed upgrades to provide ACSES testing support capabilities at transportation technology center.

    Science.gov (United States)

    2015-06-01

    FRA Task Order 314 upgraded the Positive Train Control (PTC) Test Bed at the Transportation Technology Center to support : testing of PTC systems, components, and related equipment associated with the Advanced Civil Speed Enforcement System : (ACSES)...

  14. A safety equipment list for rotary mode core sampling systems operation in single shell flammable gas tanks; TOPICAL

    International Nuclear Information System (INIS)

    SMALLEY, J.L.

    1999-01-01

    This document identifies all interim safety equipment to be used for rotary mode core sampling of single-shell flammable gas tanks utilizing Rotary Mode Core Sampling systems (RMCS). This document provides the safety equipment for RMCS trucks HO-68K-4600, HO-68K-4647, trucks three and four respectively, and associated equipment. It is not intended to replace or supersede WHC-SD-WM-SEL-023, (Kelly 1991), or WHC-SD-WM-SEL-032, (Corbett 1994), which classifies 80-68K-4344 and HO-68K-4345 respectively. The term ''safety equipment'' refers to safety class (SC) and safety significant (SS) equipment, where equipment refers to structures, systems and components (SSC's). The identification of safety equipment in this document is based on the credited design safety features and analysis contained in the Authorization Basis (AB) for rotary mode core sampling operations in single-shell flammable gas tanks. This is an interim safety classification since the AB is interim. This document will be updated to reflect the final RMCS equipment safety classification designations upon completion of a final AB which will be implemented with the release of the Final Safety Analysis Report (FSAR)

  15. Functional Upgrading and Value Capture of Multinational Subsidiaries

    DEFF Research Database (Denmark)

    Burger, Anže; Jindra, Björn; Marek, Philipp

    2018-01-01

    survey-based business function indicators with longitudinal accounting data for a representative sample of multinational subsidiaries located in six Central and Eastern European countries (CEECs), we assess the impact of functional upgrading on foreign subsidiaries' value capture. The results provide......This paper investigates the relationship between the value capture of multinational subsidiaries and functional upgrading, which is defined as a diversification of employment from primary business functions to higher value adding activities such as ICT, R&D, marketing or logistics. By combining...... robust evidence that the breadth as well as the scope of functional upgrading induces an upward shift of subsidiaries' value added. The effect of functional upgrading is stronger in the earlier phases after entry of the foreign investor, while the long-term growth trend remains unaffected....

  16. Injection septa position and angle optimisation in view of the 2 GeV liu upgrade of the CERN PS

    CERN Document Server

    Serluca, HM; Forte, V; Fraser, M; Sterbini, G

    2017-01-01

    In the framework of the LHC Injector Upgrade (LIU)project the CERN PS injection kinetic energy will be up-graded from 1.4 to 2 GeV. The injection equipment, whichis already operating close to its limit, is being redesigned tocope with 30% increase in the beam rigidity. In this paper wepresent the experimental results from Machine Development(MD) studies on the present septum to explore its operationalhardware limits with respect to aperture restrictions, beamlosses and kick strengths in view of the LIU upgrade

  17. Upgrade of the CMS hardron calorimeter for an upgraded LHC

    OpenAIRE

    Anderson, Jake

    2012-01-01

    The CMS barrel and endcap hadron calorimeters (Hcal) upgrading the current photo-sensors are hybrid photodiodes (HPDs) to meet the demands of the upgraded luminosity of the LHC. A key aspect of the Hcal upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at L1 trigger. The increased segmentation can be achieved by replacing the HPD's with multi-pixel Geiger-mode avalanche photodiodes. The upgraded electron...

  18. Analysis Efforts Supporting NSTX Upgrades

    International Nuclear Information System (INIS)

    Zhang, H.; Titus, P.; Rogoff, P.; Zolfaghari, A.; Mangra, D.; Smith, M.

    2010-01-01

    The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

  19. Digital control of the superconducting cavities for the LEP energy upgrade

    International Nuclear Information System (INIS)

    Gavallari, G.; Ciapala, E.

    1992-01-01

    The superconducting (SC) cavities for the LEP200 energy upgrade will be installed in units of 16 as for the present copper cavity system. Similar equipment will be used for RF power generation and distribution, for the low-level RF system and for digital control. The SC cavities and their associated equipment however require different interface hardware and new control software. To simplify routine operation control of the SC cavity units is made to resemble as closely as possible that of the existing units. Specific controls for the SC cavities at the equipment level, the facilities available and the integration of the SC cavity units into the LEP RF control system are described. (author)

  20. I and C upgrading at nuclear power plants

    International Nuclear Information System (INIS)

    Tamiri, A.

    2003-01-01

    Continuing the operation of existing nuclear power plants will help reduce the number of new base-load nuclear and fossil power plants that need to be built. Old nuclear power plants in Canada are operating with analog instrumentation and control systems. For a number of reasons, such as changes and improvements in the applicable standards and design, maintenance problems due to the lack of spares, technical obsolescence, the need to increase power production, availability, reliability and safety, and in order to reduce operation and maintenance costs, instrumentation and control upgrading at nuclear power plants in a cost effective manner should be considered the greatest priority. Failures of instrumentation and control (I and C) due to aging and obsolescence issues may have an immediate negative impact on plant reliability and availability and also affect long-term plant performance and safety. In today's competitive marketplace, power plants are under pressure to cut spending on maintenance while reducing the risk of equipment failure that could cause unplanned outage. To improve plant safety and availability, old nuclear power plants will require investment in new technologies that can improve the performance and reduce the costs of generation by addressing the long term reliability of systems by up-grading to modem digital instrumentation and control and optimization opportunities. Boiler drum level control at nuclear power plants is critical for both plant protection and equipment safety and applies equality to high and low levels of water within the boiler drum. Plant outage studies at Pickering Nuclear have identified boiler drum level control and feed water control systems as major contributors to plant unavailability. Ways to improve transient and steady state response, upgrading existing poor analog control systems for boiler level and feed-water control systems at Pickering Nuclear, with enhanced and robust controller will be discussed in this paper

  1. Commissioning of inline ECE system within waveguide based ECRH transmission systems on ASDEX upgrade

    NARCIS (Netherlands)

    Bongers, W.A.; Kasparek, W.; Doelman, N. J.; Braber, R. van den; Brand, H. van den; Meo, F.; Baar, M.R. de; Amerongen, F.J.; Donné, A.J.H.; Elzendoorn, B.S.Q.; Erckmann, V.; Goede, A.P.H.; Giannone, L.; Grünwald, G.; Hollman, F.; Kaas, G.; Krijger, B.; Michel, G.; Lubyako, L.; Monaco, F.; Noke, F.; Petelin, M.; Plaum, B.; Purps, F.; Pierik, J.G.W. ten; Schüller, C.; Slob, J.W.; Stober, J.K.; Schütz, H.; Wagner, D.; Westerhof, E.; Ronden, D.M.S.

    2012-01-01

    A CW capable inline electron cyclotron emission (ECE) separation system for feedback control, featuring oversized corrugated waveguides, is commissioned on ASDEX upgrade (AUG). The system is based on a combination of a polarization independent, non-resonant, Mach-Zehnder diplexer equipped with

  2. Engineering task plan for BX/BY compressor upgrade

    International Nuclear Information System (INIS)

    Strand, R.G.

    1995-01-01

    This Engineering Task Plan outlines the remaining work to be completed for the BX/BY Instrument Air upgrade. Initial work efforts were guided by Engineering Work Plan, ''BX-BY Compressor Upgrade'' dated 1-25-93 (see Attachment A) which is provided for information. The overall engineering task is to provide a permanent replacement for the instrument air supply system for the 241-BX/BY Tank Farms. The existing system consists of a 25 horsepower Worthington non-lube compressor and an Oriad air dryer. The existing equipment is dated, requires high maintenance and is located in a contaminated zone making it unusable. The BX/BY instrument air replacement unit will be one of the 100 SCFM generic air stations. This station will be permanently sited with the addition of drawing changes to provide a concrete foundation, air piping to existing lines and electrical power supply tie-ins

  3. The US nuclear safety approach to upgrading the Russian and Ukrainian reactors

    International Nuclear Information System (INIS)

    Baron, S.

    1993-01-01

    Brookhaven National Laboratory reporting to the Department of Energy has the technical and administrative management responsibilities for improving the operational and design safety systems of RBMK and the VVER reactors in Russia and the Ukraine. U.S. experts and industry interact with the Russian/Ukraine designers and operators to jointly develop the detailed requirements for system upgrades. When available, indigenous equipment and materials will be utilized. The construction and installation of most upgrades will be accomplished by Russia and the Ukraine with U.S. support and participation. This will maximize technology transfer, provide funds to U.S. and recipient country industry, and limit the nuclear liability of U.S. industry. (author)

  4. Commissioning of inline ECE system within waveguide based ECRH transmission systems on ASDEX upgrade

    DEFF Research Database (Denmark)

    Bongers, W. A.; Kasparek, W.; Doelman, N.

    2012-01-01

    A CW capable inline electron cyclotron emission (ECE) separation system for feedback control, featuring oversized corrugated waveguides, is commissioned on ASDEX upgrade (AUG). The system is based on a combination of a polarization independent, non-resonant, Mach-Zehnder diplexer equipped with di...

  5. Studies on upgrading quality of zircon concentrate by flotation method

    International Nuclear Information System (INIS)

    Nguyen Duy Phap; Nguyen Duc Hung; Nguyen Duc Thai and others

    2004-01-01

    Results of this study show that it is possible to apply flotation to upgrading quality of zircon concentrate based on a simple technological flow-sheet and simple flotation agents. It is possible to use flotation equipment of Mexanov. Product criteria include ZrO 2 >64%; TiO 2 2 O 3 <0.1%. Flotation agents are simple, little noxious and easy for preparation. (PQM)

  6. Thermal System Upgrade of the Space Environment Simulation Test Chamber

    Science.gov (United States)

    Desai, Ashok B.

    1997-01-01

    The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.

  7. UPGRADES

    CERN Document Server

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  8. Shear and Thermal Testing of Adhesives for VELO Upgrade

    CERN Document Server

    De Capua, Stefano; Klaver, Suzanne; Parkes, Chris; Rodriguez Perez, Pablo; Shtipliyski, Antoni; Stelmasiak, Guy James

    2016-01-01

    As part of the R&D process of the LHCb VELO Upgrade, a study has been performed on the thermal and mechanical performance of the adhesives Stycast 2850FT, 3M 9461P, and Araldite 2011. One or more of these adhesives could be used to attach the ASICs and hybrids to the microchannel cooling substrate. Samples were irradiated at up to the maximum dose expected at the upgrade. Shear tests of the samples were made and a suitable performance obtained from all glues. Some failures were encountered with Stycast 2850FT glued samples and this is attributed to the sample preparation. The relative thermal conductivities of the adhesives were also determined by measuring the relative temperature difference across a glued joint while one side is heated.

  9. Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements

    International Nuclear Information System (INIS)

    French, Sean B.; Johns-Hughes, Kathryn W.

    2011-01-01

    Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

  10. U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant

    International Nuclear Information System (INIS)

    Saraev, O.; Haase, M.; Smarto, C.; Mikkelsen, K.; Heinberg, C.; Showalter, R.; Soo Hoo, M.; Hatcher, C.; Forehand, M.

    1998-01-01

    During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers

  11. EBR-II secondary sodium loop Plugging Temperature Indicator control system upgrade

    International Nuclear Information System (INIS)

    Carlson, R.B.; Gehrman, R.L.

    1995-01-01

    The Experimental Breeder Reactor II (EBR-II) secondary sodium coolant loop Plugging Temperature Indicator (PTI) control system was upgraded in 1993 to a real-time computer based system. This was done to improve control, to remove obsolete and high maintenance equipment, and to provide a graphical CRT based operator interface. A goal was to accomplish this inexpensively using small, reliable computer and display hardware with a minimum of purchased software. This paper describes the PTI system, the upgraded control system and its operator interface, and development methods and tools. The paper then assesses how well the system met its goals, discusses lessons learned and operational improvements noted, and provides some recommendations and suggestions on applying small real-time control systems of this type

  12. The Effect of Introducing Upgraded Remanufacturing Strategy on OEM’s Decision

    Directory of Open Access Journals (Sweden)

    Bangyi Li

    2018-03-01

    Full Text Available Although remanufacturing has great economic and environmental potential, internal cannibalization, and lack of consumer acceptance of remanufactured products prevent original equipment manufacturer (OEM from realizing the full potential value through remanufacturing. Practices show that remanufactured products can realize their value by the donation, besides resale. Thus, this paper incorporates the donation of remanufactured products with government subsidy and presents an upgraded remanufacturing strategy to expand the demand for remanufactured products and weaken the internal cannibalization of remanufactured products. We respectively construct the two-period game model with and without upgraded remanufacturing and explore the effect of upgraded remanufacturing on production decision, economic and environmental benefits. The main conclusions are as follows. The donation subsidy is negatively related with the sale quantity of remanufactured products, but is positively related with the donation quantity of remanufactured products and the quantity of new products. The donation subsidy expands the demand for remanufactured products and weakens internal cannibalization of remanufactured products. Whether the upgraded remanufacturing strategy is profitable depends on the fixed cost of the remanufacturing. When consumers consider remanufactured products environmentally friendly, the government can realize an OEM’s win-win situation where the economic and environmental benefits get improved by adjusting the donation subsidy. Otherwise, introducing upgraded remanufacturing makes the environment worse. Comparatively speaking, a low-cost and environmentally friendly manufacturer is relatively easier to achieve the win-win situation through donation subsidy.

  13. Equipment for collecting samples of radioactive solutions; Installation de prelevements d'echantillons de solutions radioactives

    Energy Technology Data Exchange (ETDEWEB)

    Raggenbass, A.; Fradin, J.; Joubert, G.

    1958-12-03

    The authors present an equipment aimed at collecting samples of fission products to perform radio-chemical analysis. As the sample must have a total activity between 1 and 50 micro-Curie, this installation comprises a sampling system and a dilution device which aims at bringing the sample to the suitable activity. Samples are collected by means of needles. The sample reproducibility is discussed. The dilution device is described.

  14. Supporting management of medical equipment for inpatient service in public hospitals: a case study.

    Science.gov (United States)

    Figueroa, Rosa L; Vallejos, Guido E

    2013-01-01

    This work presents a study of medical equipment availability in the short and long term. The work is divided in two parts. The first part is an analysis of the medical equipment inventory for the institution of study. We consider the replacement, maintenance, and reinforcement of the available medical equipment by considering local guidelines and surveying clinical personnel appreciation. The resulting recommendation is to upgrade the current equipment inventory if necessary. The second part considered a demand analysis in the short and medium term. We predicted the future demand with a 5-year horizon using Holt-Winters models. Inventory analysis showed that 27% of the medical equipment in stock was not functional. Due to this poor performance result we suggested that the hospital gradually addresses this situation by replacing 29 non-functional equipment items, reinforcing stock with 40 new items, and adding 11 items not available in the inventory but suggested by the national guidelines. The results suggest that general medicine inpatient demand has a tendency to increase within the time e.g. for general medicine inpatient service the highest increment is obtained by respiratory (12%, RMSE=8%) and genitourinary diseases (20%, RMSE=9%). This increment did not involve any further upgrading of the proposed inventory.

  15. OPERATIONAL EXPERIENCE: UPGRADED MPC AND A SYSTEMS FOR THE RADIOCHEMICAL PLANT OF THE SIBERIAN CHEMICAL COMBINE

    International Nuclear Information System (INIS)

    RODRIGUEZ, C.; GOLOSKOKOV, I.; FISHBONE, L.; GOODEY, K.; LOOMIS, M.; CRAIN, B. JR.; LARSEN, R.

    2003-01-01

    The success of reducing the risk of nuclear proliferation through physical protection and material control/accounting systems depends upon the development of an effective design that includes consideration of the objectives of the systems and the resources available to implement the design. Included among the objectives of the design are facility characterization, definition of threat, and identification of targets. When considering resources, the designer must consider funds available, rapid low-cost elements, technology elements, human resources, and the availability of resources to sustain operation of the end system. The Siberian Chemical Combine (SCC) is a multi-function nuclear facility located in the Tomsk region of Siberia, Russia. Beginning in 1996, SCC joined with the United States Department of Energy (US/DOE) Material Protection, Control, and Accounting (MPC and A) Program to develop and implement MPC and A upgrades for the Radiochemical, Chemical Metallurgical, Conversion, Uranium Enrichment, and Reactor Plants of the SCC. At the Radiochemical Plant the MPC and A design and implementation process has been largely completed for the Plutonium Storage Facility and related areas of the Radiochemical Plant. Design and implementation of upgrades for the Radiochemical Plant include rapid physical protection upgrades such as bricking up of doors and windows, and installation of security-hardened doors. Rapid material control and accounting upgrades include installation of modern balances and bar code equipment. Comprehensive MPC and A upgrades include the installation of access controls to sensitive areas of the Plant, alarm communication and display (AC and D) systems to detect and annunciate alarm conditions, closed circuit (CCTV) systems to assess alarm conditions, central and secondary alarm station upgrades that enable security forces to assess and respond to alarm conditions, material control and accounting upgrades that include upgraded physical

  16. Improved reliability, maintainability and safety through elastomer upgrading

    International Nuclear Information System (INIS)

    Wensel, R.; Wittich, K.C.

    1995-01-01

    Equipment in nuclear plants has historically contained whatever elastomer each component supplier traditionally used for corresponding non-nuclear service. The resulting proliferation of elastomer compounds, many of which are far from optimal for the service conditions (e.g., pressure, temperature, radiation, etc.), has multiplied the costs to provide station reliability, maintainability and safety. Cost-effective improvements are being achieved in CANDU plants by upgrading and standardizing on a handful of high performing elastomer compounds. These upgraded materials offer significant gains in service life over the materials they replace (often by factors of 2 or more). This rationalization of elastomer compounds also facilitates the EQ process for safety-related equipment. Detailed test data on aging is currently being generated for these specific elastomers, encompassing the conditions and media (air, water, oil) common in CANDU service. Two key elements characterize this testing. First, each result is specific to the compound used in the test, and second, it is specific to the tested failure mode (e.g., compression set, extrusion, fracture, etc.). Having fewer, but more thoroughly tested compounds, avoids the penalty (associated with poorly characterized materials) of having to replace parts prematurely because of conservatism, while maintaining safe, reliable service. This paper provides an overview of this approach covering: the benefits of compound rationalization; and the how and why of establishing relevant failure criteria; appropriate quality assurance to maintain EQ; procurement, storage and handling guidelines; and monitoring and predicting in-service degradation. (author)

  17. Analysis and tests of TF magnet insulation samples for the JET upgrade to 4 tesla

    CERN Document Server

    Miele, P; Bettinali, L; Kaye, A; Last, J; Papastergiou, S; Riccardo, V; Visca, E

    2000-01-01

    The JET Toroidal Field (TF) coils were originally designed for operation at 3.4 tesla. In order to upgrade the field to 4 tesla and thus improve the performance of the JET machine, new mechanical tests and analysis were carried out on the insulation of TF coil samples. They are aimed at investigating the mechanical properties and the status of the insulation in order to set allowable stresses and force limits. In particular since the shear stress in the insulation is strongly affected by the shear modulus of elasticity G, it is important to measure this parameter. A method for the measurement of G in glass-resin fibres, the V-notched beam method (Iosipescu method) , was applied. The particular shape of the rectangular Iosipescu V- notched sample and the particular modality of force application produce pure shear stress for a reliable measurement of the G value and of the shear strength of the insulation. The effect of temperature on these mechanical properties was also investigated. Results show higher averag...

  18. ALICE Upgrades: Plans and Potentials

    CERN Document Server

    Tieulent, Raphael

    2015-01-01

    The ALICE collaboration consolidated and completed the installation of current detectors during LS1 with the aim to accumulate 1 nb$^{-1}$ of Pb-Pb collisions during Run 2 corresponding to about 10 times the Run 1 integrated luminosity. In parallel, the ALICE experiment has a rich detector upgrade programme scheduled during the second LHC long shutdown (LS2, 2018-2019) in order to fully exploit the LHC Runs 3 and 4. The main objectives of this programme are: improving the tracking precision and enabling the read-out of all Pb-Pb interactions at a rate of up to 50 kHz, with the goal to record an integrated luminosity of 10 nb$^{-1}$ after LS2 in minimum-bias trigger mode. This sample would represent an increase by a factor of one hundred with respect to the minimum-bias sample expected during Run 2. The implementation of this upgrade programme, foreseen in LS2, includes: a new low-material Inner Tracking System at central rapidity with a forward rapidity extension to add vertexing capabilities to the current M...

  19. South Ukraine NPP: Safety improvements through Plant Computer upgrade

    International Nuclear Information System (INIS)

    Brenman, O.; Chernyshov, M. A.; Denning, R. S.; Kolesov, S. A.; Balakan, H. H.; Bilyk, B. I.; Kuznetsov, V. I.; Trosman, G.

    2006-01-01

    This paper summarizes some results of the Plant Computer upgrade at the Units 2 and 3 of South Ukraine Nuclear Power Plant (NPP). A Plant Computer, which is also called the Computer Information System (CIS), is one of the key safety-related systems at VVER-1000 nuclear plants. The main function of the CIS is information support for the plant operators during normal and emergency operational modes. Before this upgrade, South Ukraine NPP operated out-of-date and obsolete systems. This upgrade project wax founded by the U.S. DOE in the framework of the International Nuclear Safety Program (INSP). The most efficient way to improve the quality and reliability of information provided to the plant operator is to upgrade the Human-System Interface (HSI), which is the Upper Level (UL) CIS. The upgrade of the CIS data-acquisition system (DAS), which is the Lower Level (LL) CIS, would have less effect on the unit safety. Generally speaking, the lifetime of the LL CIS is much higher than one of the UL CIS. Unlike Plant Computers at the Western-designed plants, the functionality of the WER-1000 CISs includes a control function (Centralized Protection Testing) and a number of the plant equipment monitoring functions, for example, Protection and Interlock Monitoring and Turbo-Generator Temperature Monitoring. The new system is consistent with a historical migration of the format by which information is presented to the operator away from the traditional graphic displays, for example, Piping and Instrument Diagrams (P and ID's), toward Integral Data displays. The cognitive approach to information presentation is currently limited by some licensing issues, but is adapted to a greater degree with each new system. The paper provides some lessons learned on the management of the international team. (authors)

  20. UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3

    International Nuclear Information System (INIS)

    Revankar, S. T.

    2004-01-01

    The major objective of this program is to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective one project on design and installation of interface cards for channel four detector was considered. This report is the final report and gives the efforts and progress achieved on these projects from August 2002 to July 2004

  1. TMI-2 [Three Mile Island Nuclear Power Station] fuel canister and core sample handling equipment used in INEL hot cells

    International Nuclear Information System (INIS)

    McConnell, J.W. Jr.; Shurtliff, W.T.; Lynch, R.J.; Croft, K.M.; Whitmill, L.J.; Allen, S.M.

    1987-01-01

    This paper describes the specialized remote handling equipment developed and used at the Idaho National Engineering Laboratory (INEL) to handle samples obtained from the core of the damaged Unit 2 reactor at Three Mile Island Nuclear Power Station (TM-2). Samples of the core were removed, placed in TMI-2 fuel canisters, and transported to the INEL. Those samples will be examined as part of the analysis of the TMI-2 accident. The equipment described herein was designed for removing sample materials from the fuel canisters, assisting with initial examination, and processing samples in preparation for detailed examinations. The more complex equipment used microprocessor remote controls with electric motor drives providing the required force and motion capabilities. The remaining components were unpowered and manipulator assisted

  2. Injector upgrade for the S-DALINAC

    Energy Technology Data Exchange (ETDEWEB)

    Kuerzeder, Thorsten; Brunken, Marco; Conrad, Jens; Eichhorn, Ralf; Graef, Hans-Dieter; Richter, Achim; Sievers, Sven [Institut fuer Kernphysik, TU Darmstadt (Germany); Ackermann, Wolfgang; Mueller, Wolfgang F.O.; Steiner, Bastian; Weiland, Thomas [Institut fuer Theorie Elektromagnetischer Felder, TU Darmstadt (Germany); Fuerst, Joel [Argonne National Laboratory, Argonne (United States)

    2009-07-01

    The injector section of the S-DALINAC currently delivers beams of up to 10 MeV w ith a current of up to 60{mu}A. The upgrade aims to increase both parameters to 14 MeV and 150{mu}A in order to allow more demanding experiments. Therefor e, a modified cryostat module equipped with two new cavities is required. Due to an increase in rf power to 2 kW the old coaxial rf input couplers, being design ed for a maximum power of 500 W, have to be replaced by new waveguide couplers. We review the design principles and report on the fabrication of the cavities an d the whole module.

  3. The deuterium inventory in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Mayer, M.; Rohde, V.; Ramos, G; Vainonen-Ahlgren, E.; Likonen, J.; Herrmann, A.; Neu, R.

    2007-01-01

    The deuterium inventory in ASDEX Upgrade was determined by quantitative ion beam analysis techniques and SIMS for different discharge campaigns between the years 2002 and 2005. ASDEX Upgrade was a carbon dominated machine during this phase. Full poloidal sections of the lower and upper divertor tile surfaces, limiter tiles, gaps between divertor tiles, gaps between inner heat shield tiles and samples from remote areas below the roof baffle and in pump ducts were analysed, thus offering an exhaustive survey of all relevant areas in ASDEX Upgrade. Deuterium is mainly trapped on plasma-exposed surfaces of inner divertor tiles, where about 70% of the retained deuterium inventory is found. About 20% of the inventory is retained at or below the divertor roof baffle, and about 10% is observed in other areas, such as the outer divertor and in gaps between tiles. The long term deuterium retention is 3-4% of the total deuterium input. The obtained results are compared with gas balance measurements, and conclusions about tritium retention in ITER are made

  4. Update on the University of Missouri-Columbia Research Reactor Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    McKibben, J C; Rhyne, J J [University of Missouri-Columbia (United States)

    1992-07-01

    The University of Missouri-Columbia (MU) is in the process of upgrading the research and operational capabilities of the MU Research Reactor (MURR) and associated facilities. The plans include an expanded research building that will double the laboratory space, the addition of new research programs, instrumentation and equipment, a cold neutron source, and improved reactor systems. These enhancements, which are in various stages of completion, will greatly expand the present active multidisciplinary research programs at MURR.

  5. Upgrading during difficult times

    International Nuclear Information System (INIS)

    Tiefenbach, K.

    1993-01-01

    The Co-op Upgrader is part of an integrated refinery and upgrader complex in Regina, Saskatchewan. The upgrader processes 50,000 bbl/d heavy sour crude oil, mostly Fosterton and dilute Lloydminster crude, via hydrogen addition and carbon rejection, desulfurization, demetallization, and denitrification to yield a synthetic crude blend. The synthetic crude is refined to produce gasoline and diesel fuel. Byproducts from the integrated operation include 100,000 tonnes/y of petroleum coke, 65,000 tonnes/y of sulfur, propane, butane, fuel oil, and metals (Ni and V) in the form of spent catalysts. Recent operational and economic challenges faced by the upgrader are reviewed. Technical challenges include operating the upgrader's high-temperature high-pressure heavy oil hydrotreating unit and distillate hydrogenation unit, removal and replacement of the desulfurization catalyst, waste management, and producing coke of sufficient quality. Economic challenges include the shrinking differential between light and heavy oil, higher prices for natural gas (the main raw material for hydrogen production for upgrading), seasonal changes in product specifications, and lower prices for sulfur and metal byproducts. The upgrader is also affected by interest rates since borrowing costs are the single largest expenditure after crude oil purchases. 4 figs

  6. Environmental impact assessment of oilfield upgrades in Bohai Sea

    Science.gov (United States)

    Chen, Ruihui; Xiong, Yanna; Li, Jiao; Li, Xianbo

    2018-02-01

    This paper designed 65 environmental monitoring sites to collect samples and analyze for better evaluating the environmental impact generated by cuttings, mud, produced water with oil and oil pollutions that produced during the upgrading in the Bohai Sea where the oil field 34-1 upgraded. Collecting samples include ocean water, marine life and sediments and test items involve PH, dissolved oxygen (DO), salinity, chemical oxygen demand (COD), phosphate, organic carbon, sulfide, inorganic nitrogen, petroleum, copper (Cu), lead (Pb), zinc (Zn), cadmium (Cd), total chromium (Cr), total mercury (Hg) and arsenic (As). Meanwhile sample sites collect and analyze the abundance and diversity of marine plants and elaborated the environmental impact caused by upgrading renovation project from the aspects of sea water, marine life and marine sediments. Through analysis and comparison we found that seawater quality conform the Ш seawater quality standards, the excessive rate of Cu is 10%, the average diversity index of marine life is 2.34 and evenness is 0.68. Influence range of marine sediments and pollutants of production is within 2.68km and basically has no serious impact in the surrounding sea area. It’s worth nothing that reconstruction project has the risk of oil spilling and protective measures must be prepared.

  7. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, Susila; Tang, Y.N.

    1994-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans. ((orig.))

  8. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans

  9. Bi-Provincial Upgrader

    International Nuclear Information System (INIS)

    1997-01-01

    Husky Oil's Bi-Provincial Upgrader is located in the rural municipality of Wilton, east of Lloydminster, Saskatchewan. It is jointly owned by Husky Oil and the Saskatchewan government. The upgrader is designed to produce 7.300 m 3 /cd of synthetic crude from 8.440 m 3 /cd of diluted Lloyd blend and distillates from the existing Lloydminster refinery. The designed coke and sulphur production is 415 t/day and 240 t/day respectively. Chronology of the Bi-Provincial Upgrader project was presented, along with details of the heavy oil feedstock properties for Cold Lake, Lloydminster and Lloyd Blend. Upgrader production history since start-up, synthetic crude oil customers, and the evolution of prices for Edmonton light vs. Husky LLB at Hardisty were also reviewed. 3 tabs., 9 figs

  10. Analysis of Reactor Pressurized Thermal Shock Conditions Considering Upgrading of Systems Important to Safety

    International Nuclear Information System (INIS)

    Mazurok, A.S; Vyshemirskyij, M.P.

    2015-01-01

    The paper analyzes conditions of pressurized thermal shock on the reactor pressure vessel taking into account upgrading of the emergency core cooling system and primary overpressure protection system. For representative accident scenarios, calculation and comparative analysis was carried out. These scenarios include a small leak from the hot leg and PRZ SV stuck opening with re closure after 3600 sec and 3 SG heat transfer tube rupture. The efficiency of mass flow control by valves on the pump head (emergency core cooling systems) and cold overpressure protection (primary overpressure protection system) was analyzed. The thermal hydraulic model for RELAP5/Mod3.2 code with detailed downcomer (DC) model and changes in accordance with upgrades was used for calculations. Detailed (realistic) modeling of piping and equipment was performed. The upgrades prevent excessive primary cooling and, consequently, help to preserve the RPV integrity and to avoid the formation of a through crack, which can lead to a severe accident

  11. Upgrade and extension of the climate station at DTU Byg

    DEFF Research Database (Denmark)

    Andersen, Elsa; Dragsted, Janne; Kristensen, Troels V.

    In the period 2013-2014 the project “Upgrade and Extension of the Climate Station at DTU Byg” is carried out at DTU Byg. The aim of the project is to renew the hardware and the software for data acquisition and monitoring, exchange cables and cable connections in order to avoid interference...... of electrical noise from the surroundings and exchange worn out equipment. Further, the aim is to make measured data from the climate station easily available for the users....

  12. Upgrading of seismic design of nuclear power plant building

    Energy Technology Data Exchange (ETDEWEB)

    Akiyama, Hiroshi [Tokyo Univ. (Japan). Faculty of Engineering; Kitada, Yoshio

    1997-03-01

    In Japan seismic design methodology of nuclear power plant (NPP) structures has been established as introduced in the previous session. And yet efforts have been continued to date to upgrade the methodology, because of conservative nature given to the methodology in regard to unknown phenomena and technically-limited modeling involved in design analyses. The conservative nature tends to produce excessive safety margins, and inevitably send NPP construction cost up. Moreover, excessive seismic design can increase the burden on normal plant operation, though not necessarily contributing to overall plant safety. Therefore, seismic engineering has put to many tests and simulation analyses in hopes to rationalize seismic design and enhance reliability of seismic safety of NPPs. In this paper, we describe some studies on structural seismic design of NPP underway as part of Japan`s effort to upgrade existing seismic design methodology. Most studies described here are carried out by NUPEC (Nuclear Power Engineering Company) funded by MITI (the Ministry of International Trade and Industry Japan), though, similar studies with the same motive are also carrying out by nuclear industries such as utilities, NPP equipment and system manufacturers and building constructors. This paper consists of three sections, each introducing studies relating to NPP structural seismic design, new siting technology, and upgrading of the methodology of structural design analyses. (J.P.N.)

  13. Upgrading of seismic design of nuclear power plant building

    International Nuclear Information System (INIS)

    Akiyama, Hiroshi; Kitada, Yoshio.

    1997-01-01

    In Japan seismic design methodology of nuclear power plant (NPP) structures has been established as introduced in the previous session. And yet efforts have been continued to date to upgrade the methodology, because of conservative nature given to the methodology in regard to unknown phenomena and technically-limited modeling involved in design analyses. The conservative nature tends to produce excessive safety margins, and inevitably send NPP construction cost up. Moreover, excessive seismic design can increase the burden on normal plant operation, though not necessarily contributing to overall plant safety. Therefore, seismic engineering has put to many tests and simulation analyses in hopes to rationalize seismic design and enhance reliability of seismic safety of NPPs. In this paper, we describe some studies on structural seismic design of NPP underway as part of Japan's effort to upgrade existing seismic design methodology. Most studies described here are carried out by NUPEC (Nuclear Power Engineering Company) funded by MITI (the Ministry of International Trade and Industry Japan), though, similar studies with the same motive are also carrying out by nuclear industries such as utilities, NPP equipment and system manufacturers and building constructors. This paper consists of three sections, each introducing studies relating to NPP structural seismic design, new siting technology, and upgrading of the methodology of structural design analyses. (J.P.N.)

  14. HYACE - a novel autoclave coring equipment for systematic offshore gashydrate sampling

    Energy Technology Data Exchange (ETDEWEB)

    Amann, H.; Hohnberg, H.J.; Reinelt, R. [Technische Univ. Berlin (Germany). Inst. fuer Schiffs- und Meerestechnik, Fachgebiet Maritime Technik

    1997-12-31

    HYACE, the acronym for hydrate autoclave coring equipment system, is a research and development project sponsored by the European Union`s Marine Science and Technology Programme MAST. The project was to have started in the fourth quarter of 1997 and is to last 30 months. The main activities of the project will be in the development and prototype testing of an innovative down-hole controlled autoclave coring system. This system will be designed to sample marine sediments at extended down-hole conditions maintaining as many parameters constant as possible. In general terms, the main aim of the project is to contribute to systematic ground truthing of a necessarily ephemeral phenomenon of growing global significance: sampling and analysis of gas hydrates in their natural environment. (MSK)

  15. Incidence, predictors, and procedural results of upgrade to resynchronization therapy: the RAFT upgrade substudy.

    Science.gov (United States)

    Essebag, Vidal; Joza, Jacqueline; Birnie, David H; Sapp, John L; Sterns, Laurence D; Philippon, Francois; Yee, Raymond; Crystal, Eugene; Kus, Teresa; Rinne, Claus; Healey, Jeffrey S; Sami, Magdi; Thibault, Bernard; Exner, Derek V; Coutu, Benoit; Simpson, Chris S; Wulffhart, Zaev; Yetisir, Elizabeth; Wells, George; Tang, Anthony S L

    2015-02-01

    The resynchronization-defibrillation for ambulatory heart failure trial (RAFT) study demonstrated that adding cardiac resynchronization therapy (CRT) in selected patients requiring de novo implantable cardiac defibrillators (ICD) reduced mortality as compared with ICD therapy alone, despite an increase in procedure-related adverse events. Data are lacking regarding the management of patients with ICD therapy who develop an indication for CRT upgrade. Participating RAFT centers provided data regarding de novo CRT-D (CRT with ICD) implant, upgrade to CRT-D during RAFT (study upgrade), and upgrade within 6 months after presentation of study results (substudy). Substudy centers enrolled 1346 (74.9%) patients in RAFT, including 644 de novo, 80 study upgrade, and 60 substudy CRT attempts. The success rate (initial plus repeat attempts) was 95.2% for de novo versus 96.3% for study upgrade and 90.0% for substudy CRT attempts (P=0.402). Acute complications occurred among 26.2% of de novo versus 18.8% of study upgrade and 3.4% of substudy CRT implantation attempts (PRAFT study and other trials. © 2014 American Heart Association, Inc.

  16. Automated processing of forensic casework samples using robotic workstations equipped with nondisposable tips: contamination prevention.

    Science.gov (United States)

    Frégeau, Chantal J; Lett, C Marc; Elliott, Jim; Yensen, Craig; Fourney, Ron M

    2008-05-01

    An automated process has been developed for the analysis of forensic casework samples using TECAN Genesis RSP 150/8 or Freedom EVO liquid handling workstations equipped exclusively with nondisposable tips. Robot tip cleaning routines have been incorporated strategically within the DNA extraction process as well as at the end of each session. Alternative options were examined for cleaning the tips and different strategies were employed to verify cross-contamination. A 2% sodium hypochlorite wash (1/5th dilution of the 10.8% commercial bleach stock) proved to be the best overall approach for preventing cross-contamination of samples processed using our automated protocol. The bleach wash steps do not adversely impact the short tandem repeat (STR) profiles developed from DNA extracted robotically and allow for major cost savings through the implementation of fixed tips. We have demonstrated that robotic workstations equipped with fixed pipette tips can be used with confidence with properly designed tip washing routines to process casework samples using an adapted magnetic bead extraction protocol.

  17. ATLAS Tile Calorimeter performance for the phase II upgrade

    CERN Document Server

    Sellapillay, Kevissen

    2017-01-01

    The first part of the internship is focused on trying to assess the performance of the upgraded geometry of the ATLAS Tile Calorimeter. To do this, we use Monte Carlo generated samples for the upgraded geometry and from the current geometry, then we derive the pT response and resolution. The second part of the study is an analysis of the sensitivity of the two different geometries to a new heavy boson that would decay into a top quark pair $Z^{\\prime} \\rightarrow t\\bar{t}$.

  18. Upgrade of the ATLAS Silicon Tracker for the sLHC

    CERN Document Server

    Minano, M; The ATLAS collaboration

    2009-01-01

    While the CERN Large Hadron Collider (LHC) will start taking data this year, scenarios for a machine upgrade to achieve a much higher luminosity are being developed. In the current planning, it is foreseen to increase the luminosity of the LHC at CERN around 2016 by about an order of magnitude, with the upgraded muchine dubbed Super-LHC or SLHC. As radiation damage scales with integrated luminosity, the particle physics experiments at the SLHC will need to be equipped with a new generation of radiation-hard detectors. This is of particular importance for the semiconductor tracking detectors located close to the LHC interaction region, where the higest radiation doses occur. The ATLAS experiment will require a new particle tracking system for SLHC operation. In order to cope with the increase in background events by about one order of magnitude at the higher luminosity, an all silicon detector with enhanced radiation hardness is being designed. The new silicon strip detector will use significantly shorter stri...

  19. Upgrades and Real Time Ntm Control Application of the Ece Radiometer on Asdex Upgrade

    Science.gov (United States)

    Hicks, N. K.; Suttrop, W.; Behler, K.; Giannone, L.; Manini, A.; Maraschek, M.; Raupp, G.; Reich, M.; Sips, A. C. C.; Stober, J.; Treutterer, W.; ASDEX Upgrade Team; Cirant, S.

    2009-04-01

    The 60-channel electron cyclotron emission (ECE) radiometer diagnostic on the ASDEX Upgrade tokamak is presently being upgraded to include a 1 MHz sampling rate data acquisition system. This expanded capability allows electron temperature measurements up to 500 kHz (anti-aliasing filter cut-off) with spatial resolution ~1 cm, and will thus provide measurement of plasma phenomena on the MHD timescale, such as neoclassical tearing modes (NTMs). The upgraded and existing systems may be run in parallel for comparison, and some of the first plasma measurements using the two systems together are presented. A particular planned application of the upgraded radiometer is integration into a real-time NTM stabilization loop using targeted deposition of electron cyclotron resonance heating (ECRH). For this loop, it is necessary to determine the locations of the NTM and ECRH deposition using ECE measurements. As the magnetic island of the NTM repeatedly rotates through the ECE line of sight, electron temperature fluctuations at the NTM frequency are observed. The magnetic perturbation caused by the NTM is independently measured using Mirnov coils, and a correlation profile between these magnetic measurements and the ECE data is constructed. The phase difference between ECE oscillations on opposite sides of the island manifests as a zero-crossing of the correlation profile, which determines the NTM location in ECE channel space. To determine the location of ECRH power deposition, the power from a given gyrotron may be modulated at a particular frequency. Correlation analysis of this modulated signal and the ECE data identifies a particular ECE channel associated with the deposition of that gyrotron. Real time equilibrium reconstruction allows the ECE channels to be translated into flux surface and spatial coordinates for use in the feedback loop.

  20. Seismic verification of nuclear plant equipment anchorage

    International Nuclear Information System (INIS)

    Lepiece, M.; Van Vyve, J.

    1991-01-01

    More than 60% of the electrical power of Belgium is generated by seven PWR nuclear power plants. For three of them, the electro-mechanical equipment had to be reassessed after ten years of operation, because the seismic requirements were upgraded from 0.1 g to 0.17 g free field ground acceleration. The seismic requalification of the active equipment was a critical problem as the classical methods were too conservative. The approach based on the use of the past experience on the seismic behavior of nonnuclear equipment, chosen and developed by the SQUG, had to be transposed to the Belgian N.P.P. The decision of the accept-ability of equipment relies heavily on the aseismatic capacity of anchorage. The Electrical Power Research Institute (EPRI) developed the procedure and guideline for the demonstration of the aseismatic adequacy of equipment anchorage in a cost-effective and consistent manner, to support the decision by Seismic Review Team. The field inspection procedure to identify the type of fasteners and detect their possible defects and the verification procedure developed to calculate the aseismatic capacity of equipment anchorage on the strength of fasteners, the aseismatic capacity of anchorage and the comparison of the capacity with the demand are reported. (K.I.)

  1. Upgradation of nuclear medical equipment in the developing countries and its impact in Bangladesh

    CERN Document Server

    Jahangir, S M; Haque, M A S; Hoq, M; Mawla, Y; Morium, T; Uddin, M R; Xie, Y

    2002-01-01

    Bangladesh has thirteen Nuclear Medical Centres and one Institute of Nuclear Medicine in the country which are being run and maintained by the physicians scientists and engineers of Bangladesh Atomic Energy Commission. The peaceful application of atomic energy was initiated through all these Centres with the use of clinical isotopes for thyroid and kidney studies. The equipment used for these purposes were the thyroid uptake system, rectilinear scanner and the multiprobe renogram system. The first gamma camera was installed in the country in 1980 at the Institute of Nuclear Medicine, Dhaka. That was the turning point for the country in the field of nuclear medicine. Presently all the nuclear medical establishments are equipped least with a gamma camera, thyroid uptake system and a renogram system. In the last two decades there has been a tremendous development in the design of nuclear medical equipment. Most of the old equipments were slow and manually operated. In the beginning of nineties of the past centur...

  2. A Neutral Beam Injector Upgrade for NSTX

    International Nuclear Information System (INIS)

    Stevenson, T.; McCormack, B.; Loesser, G.D.; Kalish, M.; Ramakrishnan, S.; Grisham, L.; Edwards, J.; Cropper, M.; Rossi, G.; Halle, A. von; Williams, M.

    2002-01-01

    The National Spherical Torus Experiment (NSTX) capability with a Neutral Beam Injector (NBI) capable of 80 kiloelectronvolt (keV), 5 Megawatt (MW), 5 second operation. This 5.95 million dollar upgrade reused a previous generation injector and equipment for technical, cost, and schedule reasons to obtain these specifications while retaining a legacy capability of 120 keV neutral particle beam delivery for shorter pulse lengths for possible future NSTX experiments. Concerns with NBI injection included power deposition in the plasma, aiming angles from the fixed NBI fan array, density profiles and beam shine through, orbit losses of beam particles, and protection of the vacuum vessel wall against beam impingement. The upgrade made use of the beamline and cryo panels from the Neutral Beam Test Stand facility, existing power supplies and controls, beamline components and equipment not contaminated by tritium during DT [deuterium-tritium] experiments, and a liquid Helium refrigerator plant to power and cryogenically pump a beamline and three ion sources. All of the Tokamak Fusion Test Reactor (TFTR) ion sources had been contaminated with tritium, so a refurbishment effort was undertaken on selected TFTR sources to rid the three sources destined for the NSTX NBI of as much tritium as possible. An interconnecting duct was fabricated using some spare and some new components to attach the beamline to the NSTX vacuum vessel. Internal vacuum vessel armor using carbon tiles was added to protect the stainless steel vacuum vessel from beam impingement in the absence of plasma and interlock failure. To date, the NBI has operated to 80 keV and 5 MW and has injected requested power levels into NSTX plasmas with good initial results, including high beta and strong heating characteristics at full rated plasma current

  3. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  4. Implementation of an Enhanced Measurement Control Program for handling nuclear safety samples at WSRC

    International Nuclear Information System (INIS)

    Boler-Melton, C.; Holland, M.K.

    1991-01-01

    In the separation and purification of nuclear material, nuclear criticality safety (NCS) is of primary concern. The primary nuclear criticality safety controls utilized by the Savannah River Site (SRS) Separations Facilities involve administrative and process equipment controls. Additional assurance of NCS is obtained by identifying key process hold points where sampling is used to independently verify the effectiveness of production control. Nuclear safety measurements of samples from these key process locations provide a high degree of assurance that processing conditions are within administrative and procedural nuclear safety controls. An enhanced procedure management system aimed at making improvements in the quality, safety, and conduct of operation was implemented for Nuclear Safety Sample (NSS) receipt, analysis, and reporting. All procedures with nuclear safety implications were reviewed for accuracy and adequate detail to perform the analytical measurements safely, efficiently, and with the utmost quality. Laboratory personnel worked in a ''Deliberate Operating'' mode (a systematic process requiring continuous expert oversight during all phases of training, testing, and implementation) to initiate the upgrades. Thus, the effort to revise and review nuclear safety sample procedures involved a team comprised of a supervisor, chemist, and two technicians for each procedure. Each NSS procedure was upgraded to a ''Use Every Time'' (UET) procedure with sign-off steps to ensure compliance with each step for every nuclear safety sample analyzed. The upgrade program met and exceeded both the long and short term customer needs by improving measurement reliability, providing objective evidence of rigid adherence to program principles and requirements, and enhancing the system for independent verification of representative sampling from designated NCS points

  5. Status of TMX upgrade diagnostics construction

    International Nuclear Information System (INIS)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-01-01

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan

  6. Slum Upgrading and Health Equity.

    Science.gov (United States)

    Corburn, Jason; Sverdlik, Alice

    2017-03-24

    Informal settlement upgrading is widely recognized for enhancing shelter and promoting economic development, yet its potential to improve health equity is usually overlooked. Almost one in seven people on the planet are expected to reside in urban informal settlements, or slums, by 2030. Slum upgrading is the process of delivering place-based environmental and social improvements to the urban poor, including land tenure, housing, infrastructure, employment, health services and political and social inclusion. The processes and products of slum upgrading can address multiple environmental determinants of health. This paper reviewed urban slum upgrading evaluations from cities across Asia, Africa and Latin America and found that few captured the multiple health benefits of upgrading. With the Sustainable Development Goals (SDGs) focused on improving well-being for billions of city-dwellers, slum upgrading should be viewed as a key strategy to promote health, equitable development and reduce climate change vulnerabilities. We conclude with suggestions for how slum upgrading might more explicitly capture its health benefits, such as through the use of health impact assessment (HIA) and adopting an urban health in all policies (HiAP) framework. Urban slum upgrading must be more explicitly designed, implemented and evaluated to capture its multiple global environmental health benefits.

  7. Life extension, power upgrade, and return to service work for Pickering NGS and other PWR and CANDU plants

    International Nuclear Information System (INIS)

    Millman, J.; Idvorian, N.; Schneider, W.

    2002-01-01

    Work on life extension, power upgrade and return to service has been performed and is in progress for a number of PWR and CANDU plants. For PWR plants, power upgrade work has been done for the new replacement steam generators in several cases. This work consists of redoing the formal equipment qualification analysis and reports for the uprated operating conditions to support the application for license adjustment. Life extension assessments have been performed for several CANDU plants. These are highly detailed assessments in which the particular steam generator is reassessed part by part as to the ability of each to sustain full life operation and also extended life operation. Return to service work for Pickering NGSA specifically has included this type of assessment and also specific repair, cleaning and retrofit activities including secondary side inspection, waterlancing, divider plate repair, eddy current inspection, etc. Steam generator modifications and retrofit work have been performed in a number of cases. The paper discusses various life extension, power upgrade, equipment modification and return to service activities all of which are part of the renewed drive in the industry to realise the full potential of nuclear plants by getting more and better performance from the extended service of existing plants. (author)

  8. The upgrade of the ALICE Inner Tracking System

    CERN Document Server

    Ravasenga, Ivan

    2017-01-01

    In 2021, for the third run of the CERN Large Hadron Collider (LHC), Pb-Pb collisions will be performed at a centre-of-mass energy per nucleon of 5.5 TeV, with an integrated luminosity of $6 \\times 10^{27}$ cm$^{-2}$ s$^{-1}$ and at an unprecedented interaction rate up to 50 kHz. To fulfil the requirements of the ALICE physics program for Run 3, the ALICE experiment at LHC is planning a major upgrade during the Long Shutdown 2 of LHC in 2019-2020. One of the key elements, is the construction of a new ultra-light and high-resolution Inner Tracking System (ITS). The upgraded ITS will significantly enhance the determination of the distance of closest approach to the primary vertex, the tracking efficiency at low transverse momenta, and the read-out rate capabilities, with respect to what can be achieved with the current detector. It will consist of seven layers equipped with silicon Monolithic Active Pixel Sensors (MAPS) with a pixel size of the order of $30 \\times 30 \\mu m^2$. They will be produced by Towerjazz ...

  9. Studies for the ALICE inner tracking system upgrade

    International Nuclear Information System (INIS)

    Reidt, Felix

    2016-01-01

    The ALICE experiment at the CERN LHC identifies D"0 mesons via secondary-vertex reconstruction and topological cuts to reduce the corresponding combinatorial background in heavy-ion collisions. The D"0 meson is produced promptly in initial, hard scatterings via the strong interaction or as feed-down from weakly decaying B hadrons. Within this thesis, a novel method for the separation of prompt and feed-down D"0 mesons using cut variations was implemented and applied to data from p-Pb collisions at √(s_N_N)=5.02 TeV. The effectiveness of the secondary-vertex reconstruction strongly depends on the performance and in particular the pointing resolution of the Inner Tracking System. The upgrade of the ALICE Inner Tracking System for the Long Shutdown 2 of the LHC in 2019/2020 will significantly improve its vertex-reconstruction and tracking capabilities. It will be equipped with Monolithic Active Pixel Sensors manufactured using the TowerJazz 180 nm CMOS process on wafers with a high-resistivity epitaxial layer. In another part of this thesis, several pixel-chip prototypes of the ALPIDE architecture with in-pixel amplification and discrimination as well as in-matrix data reduction were characterised. The pALPIDE-2 prototype was measured to fulfil the requirements in terms of detection efficiency, fake-hit rate, position resolution and tolerance to irradiation with non-ionising energy loss. Based on simulations modelling the tracking and vertex-reconstruction performance of the upgraded Inner Tracking System, the perspective of the feed-down separation using cut variations after the upgrade was assessed within this thesis.

  10. Guideline on evaluation and acceptance of commercial grade digital equipment for nuclear safety applications

    International Nuclear Information System (INIS)

    1996-10-01

    Nuclear power plants are increasingly upgrading their instrumentation and control (I ampersand C) systems with commercial digital equipment, which allows them to continue meeting safety and reliability requirements while controlling operating costs. However, the use of commercial software-based devices for safety related applications has raised new issues that impact design, procurement, and licensing activities. This guideline describes a consistent, comprehensive approach for the evaluation and acceptance of commercial digital equipment for nuclear safety systems

  11. Main Control Room Upgrade for Kori Unit 1 in Korea

    International Nuclear Information System (INIS)

    Ha, Jae Taeg; Choi, Moon Jae

    2014-01-01

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles

  12. Main Control Room Upgrade for Kori Unit 1 in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Taeg; Choi, Moon Jae [KEPCO, Daejeon (Korea, Republic of)

    2014-08-15

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles.

  13. The upgraded external-beam PIXE/PIGE set-up at LABEC for very fast measurements on aerosol samples

    Energy Technology Data Exchange (ETDEWEB)

    Lucarelli, F., E-mail: lucarelli@fi.infn.it; Calzolai, G.; Chiari, M.; Giannoni, M.; Mochi, D.; Nava, S.; Carraresi, L.

    2014-01-01

    At the 3 MV Tandetron accelerator of the LABEC laboratory of INFN in Florence, an external beam facility is fully dedicated to measurements of elemental composition of atmospheric aerosol. The experimental set-up hitherto used for this kind of applications has been upgraded with the replacement of a traditional Si(Li) detector for the detection of medium–high Z elements with a silicon drift detector (SDD) with a big active area (80 mm{sup 2}) and 450 μm thickness, with the aim of obtaining better minimum detection limits (MDL) and reduce measuring times. The Upilex extraction window has been replaced by a more resistant one (Si{sub 3}N{sub 4}). A comparison between the old Si(Li) and the new SDD for aerosol samples collected on different substrata like Teflon, Kapton and Nuclepore evidenced the better performances of the SDD. It allows obtaining better results (higher counting statistics, lower MDLs) even in shorter measuring times, thus allowing very fast analysis of both daily and hourly samples.

  14. Overview of Mobile Equipment Used in Case of Beyond Design Basis Accident at NPP Krsko

    International Nuclear Information System (INIS)

    Lukacevic, H.; Kopinc, D.; Ivanjko, M.

    2016-01-01

    Terrorist attack in USA in the September 11, 2001 and accident at the Fukushima - Daiichi Nuclear Power Station in the March 11, 2011 highlight the importance of mitigating strategies in responding to Beyond Design Basis Accident (BDBA), while ensuring cooling of reactor core, containment and spent fuel pool. Nuclear Power Plant Krsko (NEK) has acquired additional mobile equipment and made necessary modifications on existing systems for the connection of this equipment (fast couplers). Usage of mobile equipment is not only limited to design basis accident (DBA), but, also to prevent and mitigate the consequences in case of BDBA, when other plant systems are not available. NEK also decided to take steps for upgrade of safety measures and prepared Safety Upgrade Program (SUP), which is consistent with the nuclear industry response to the Fukushima accident and is implementing main projects and modifications related to SUP. NEK mobile equipment is not required to operate under normal reactor plant operation except for periodic surveillance testing and is incorporated into the normal training process. Equipment is dislocated from the reactor building and most of the equipment is located in the new building, able to withstand extreme natural events, including earthquakes and tornadoes. The usage of all mobile equipment is prescribed as an additional option in NEK operating procedures in following cases and enables following options: filling various tanks, filling the steam generators, filling the containment, additional compressed air source, spent fuel pool refilling and spraying, alternative power supply. This document provides an overview of NEK mobile equipment, which consists of various mobile fire protection pumps, air compressors, protective equipment, fire trucks, diesel generators. Sufficient fuel supply for the equipment is provided on site for a minimum three days of operation. (author).

  15. Upgradation of automatic liquid scintillation counting system

    International Nuclear Information System (INIS)

    Bhattacharya, Sadhana; Behere, Anita; Sonalkar, S.Y.; Vaidya, P.P.

    2001-01-01

    This paper describes the upgradation of Microprocessor based Automatic Liquid Scintillation Counting systems (MLSC). This system was developed in 1980's and subsequently many systems were manufactured and supplied to Environment Survey labs at various Nuclear Power Plants. Recently this system has been upgraded to a more sophisticated one by using PC add-on hardware and developing Windows based software. The software implements more intuitive graphical user interface and also enhances the features making it comparable with commercially available systems. It implements data processing using full spectrum analysis as against channel ratio method adopted earlier, improving the accuracy of the results. Also it facilitates qualitative as well as quantitative analysis of the β-spectrum. It is possible to analyze a sample containing an unknown β-source. (author)

  16. Safety Review related to Commercial Grade Digital Equipment in Safety System

    International Nuclear Information System (INIS)

    Yu, Yeongjin; Park, Hyunshin; Yu, Yeongjin; Lee, Jaeheung

    2013-01-01

    The upgrades or replacement of I and C systems on safety system typically involve digital equipment developed in accordance with non-nuclear standards. However, the use of commercial grade digital equipment could include the vulnerability for software common-mode failure, electromagnetic interference and unanticipated problems. Although guidelines and standards for dedication methods of commercial grade digital equipment are provided, there are some difficulties to apply the methods to commercial grade digital equipment for safety system. This paper focuses on regulatory guidelines and relevant documents for commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. This paper focuses on KINS regulatory guides and relevant documents for dedication of commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. Dedication including critical characteristics is required to use the commercial grade digital equipment on safety system in accordance with KEPIC ENB 6370 and EPRI TR-106439. The dedication process should be controlled in a configuration management process. Appropriate methods, criteria and evaluation result should be provided to verify acceptability of the commercial digital equipment used for safety function

  17. Development of CMOS pixel sensors for the upgrade of the ALICE Inner Tracking System

    International Nuclear Information System (INIS)

    Molnar, L.

    2014-01-01

    The ALICE Collaboration is preparing a major upgrade of the current detector, planned for installation during the second long LHC shutdown in the years 2018-19, in order to enhance its low-momentum vertexing and tracking capability, and exploit the planned increase of the LHC luminosity with Pb beams. One of the cornerstones of the ALICE upgrade strategy is to replace the current Inner Tracking System in its entirety with a new, high resolution, low-material ITS detector. The new ITS will consist of seven concentric layers equipped with Monolithic Active Pixel Sensors (MAPS) implemented using the 0.18 μm CMOS technology of TowerJazz. In this contribution, the main key features of the ITS upgrade will be illustrated with emphasis on the functionality of the pixel chip. The ongoing developments on the readout architectures, which have been implemented in several fabricated prototypes, will be discussed. The operational features of these prototypes as well as the results of the characterisation tests before and after irradiation will also be presented

  18. Development of CMOS pixel sensors for the upgrade of the ALICE Inner Tracking System

    Science.gov (United States)

    Molnar, L.

    2014-12-01

    The ALICE Collaboration is preparing a major upgrade of the current detector, planned for installation during the second long LHC shutdown in the years 2018-19, in order to enhance its low-momentum vertexing and tracking capability, and exploit the planned increase of the LHC luminosity with Pb beams. One of the cornerstones of the ALICE upgrade strategy is to replace the current Inner Tracking System in its entirety with a new, high resolution, low-material ITS detector. The new ITS will consist of seven concentric layers equipped with Monolithic Active Pixel Sensors (MAPS) implemented using the 0.18 μm CMOS technology of TowerJazz. In this contribution, the main key features of the ITS upgrade will be illustrated with emphasis on the functionality of the pixel chip. The ongoing developments on the readout architectures, which have been implemented in several fabricated prototypes, will be discussed. The operational features of these prototypes as well as the results of the characterisation tests before and after irradiation will also be presented.

  19. Repairing and Upgrading Your PC

    CERN Document Server

    Thompson, Robert

    2009-01-01

    Repairing and Upgrading Your PC delivers start-to-finish instructions, simple enough for even the most inexperienced PC owner, for troubleshooting, repairing, and upgrading your computer. Written by hardware experts Robert Bruce Thompson and Barbara Fritchman Thompson, this book covers it all: how to troubleshoot a troublesome PC, how to identify which components make sense for an upgrade, and how to tear it all down and put it back together. This book shows how to repair and upgrade all of your PC's essential components.

  20. Upgrade Analog Readout and Digitizing System for ATLAS TileCal Demonstrator

    CERN Document Server

    Tang, F; Anderson, K; Bohm, C; Hildebrand, K; Muschter, S; Oreglia, M

    2015-01-01

    The TileCal Demonstrator is a prototype for a future upgrade to the ATLAS hadron calorimeter when the Large Hadron Collider increases luminosity in year 2023 (HL-LHC). It will be used for functionality and performance tests. The Demonstrator has 48 channels of upgraded readout and digitizing electronics and a new digital trigger capability, but is backwards-compatible with the present detector system insofar as it also provides analog trigger signals. The Demonstrator is comprised of 4 identical mechanical mini-drawers, each equipped with up to 12 photomultipliers (PMTs). The on-detector electronics includes 45 Front-End Boards, each serving an individual PMT; 4 Main Boards, each to control and digitize up to 12 PMT signals, and 4 corresponding high-speed Daughter Boards serving as data hubs between on-detector and off-detector electronics. The Demonstrator is fully compatible with the present system, accepting ATLAS triggers, timing and slow control commands for the data acquisition, detector control, and de...

  1. Resistive Micromegas for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    Iodice, Mauro; The ATLAS collaboration

    2016-01-01

    Large size resistive Micromegas detectors will be employed for the first time in high-energy physics experiments for the Muon Spectrometer upgrade of the ATLAS experiment at CERN. The current innermost stations of the muon endcap system, the Small Wheel, will be upgraded in 2019 to retain the good precision tracking and trigger capabilities in the high background environment expected with the upcoming luminosity increase of the LHC. Along with the small-strip Thin Gap Chambers (sTGC) the “New Small Wheel” will be equipped with eight layers of Micromegas (MM) detectors arranged in multilayers of two quadruplets, for a total of about 1200 m$^2$ detection planes. All quadruplets have trapezoidal shapes with surface areas between 2 and 3 m$^2$. The Micromegas system will provide both trigger and tracking capabilities. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, a challenging mechanical precision is required in the construction for each plane of the assembled modules, with an alig...

  2. Automated Clean Chemistry for Bulk Analysis of Environmental Swipe Samples - FY17 Year End Report

    Energy Technology Data Exchange (ETDEWEB)

    Ticknor, Brian W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Metzger, Shalina C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); McBay, Eddy H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hexel, Cole R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Tevepaugh, Kayron N. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bostick, Debra A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-11-30

    Sample preparation methods for mass spectrometry are being automated using commercial-off-the-shelf (COTS) equipment to shorten lengthy and costly manual chemical purification procedures. This development addresses a serious need in the International Atomic Energy Agency’s Network of Analytical Laboratories (IAEA NWAL) to increase efficiency in the Bulk Analysis of Environmental Samples for Safeguards program with a method that allows unattended, overnight operation. In collaboration with Elemental Scientific Inc., the prepFAST-MC2 was designed based on COTS equipment. It was modified for uranium/plutonium separations using renewable columns packed with Eichrom TEVA and UTEVA resins, with a chemical separation method based on the Oak Ridge National Laboratory (ORNL) NWAL chemical procedure. The newly designed prepFAST-SR has had several upgrades compared with the original prepFAST-MC2. Both systems are currently installed in the Ultra-Trace Forensics Science Center at ORNL.

  3. Guidelines for Electromagnetic Interference Testing of Power Plant Equipment: Revision 3 to TR-102323

    International Nuclear Information System (INIS)

    Cunningham, J.; Shank, J.

    2004-01-01

    To continue meeting safety and reliability requirements while controlling costs, operators of nuclear power plants must be able to replace and upgrade equipment in a cost-effective manner. One issue that has been problematic for new plant equipment and especially for digital instrumentation and control (I and C) systems in recent years is electromagnetic compatibility (EMC). The EMC issue usually involves testing to show that critical equipment will not be adversely affected by electromagnetic interference (EMI) in the plant environment. This guide will help nuclear plant engineers address EMC issues and qualification testing in a consistent, comprehensive manner

  4. Guidelines for Electromagnetic Interference Testing of Power Plant Equipment: Revision 3 to TR-102323

    Energy Technology Data Exchange (ETDEWEB)

    J. Cunningham and J. Shank

    2004-11-01

    To continue meeting safety and reliability requirements while controlling costs, operators of nuclear power plants must be able to replace and upgrade equipment in a cost-effective manner. One issue that has been problematic for new plant equipment and especially for digital instrumentation and control (I&C) systems in recent years is electromagnetic compatibility (EMC). The EMC issue usually involves testing to show that critical equipment will not be adversely affected by electromagnetic interference (EMI) in the plant environment. This guide will help nuclear plant engineers address EMC issues and qualification testing in a consistent, comprehensive manner.

  5. Typical cost analysis of I and C System Upgrade for NPPs in Korea

    International Nuclear Information System (INIS)

    Hyun, J. W.; Sung, C. H.; Chung, H. Y.

    2007-01-01

    About 450 nuclear power plants are operating in the world and almost half of these nuclear power plants are at least 20 years old. Most existing I and C(Instrumentation and Control) systems in nuclear power plants throughout the world were built with analog equipment and relays that were designed 30 to 50 years ago. And among these nuclear power plants many utilities are needed to modernize their I and C systems due to obsolescence and aging etc. Due to the upgrade characteristics of High cost and long term, in-depth feasibility study with systematic investment planning is needed for successful I and C modernization. Besides, in order to perform an efficient modernization project, cost effective analysis which is an essential factor for the Cost-benefit investment must be considered first. In this paper, a typical calculation has been made for evaluating the cost of each I and C upgrade for the target of Westinghouse plants in Korea and compared with the operating maintenance cost. This study is made in a part of economic analysis for research task, named 'Development of Reliability Evaluation system for Upgrading Nuclear Power Plant I and C systems', which performed during 2004 - 2007

  6. SRS control system upgrade requirements

    International Nuclear Information System (INIS)

    Hill, L.F.

    1998-01-01

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document

  7. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    Science.gov (United States)

    2015-12-01

    automatic blade fold of the new composite rotor blades, new performance matched transmissions, a new four-bladed tail rotor and drive system, upgraded...Upgrades December 2015 SAR March 18, 2016 10:59:17 UNCLASSIFIED 4 Col Steven Girard PMA-276 USMC Light/Attack Helicopter Program Executive Officer...attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance and fire support coordination

  8. Seismic upgrading of the Brookhaven High Flux Beam Research Reactor

    International Nuclear Information System (INIS)

    Subudhi, M.

    1985-01-01

    In recent years the High Flux Beam Research (HFBR) reactor facility at Brookhaven National Laboratory (BNL) was upgraded from 40 to 50 MW power level. The reactor plant was built in the early sixties to the seismic design requirements of the period, using the static load approach. While the plant power level was upgraded, the seismic design was also improved according to current design criteria. This included the development of new floor response spectra for the facility and an overall seismic analysis of those systems important to the safe shutdown of the reactor. Items included in the reanalysis are the containment building with its internal structure, the piping systems, tanks, equipment, and heat exchangers. This paper describes the procedure utilized in developing the floor response spectra for the existing facility. Also included in the paper are the findings and recommendations, based on the seismic analysis, regarding the seismic adequacy of structural and mechanical systems vital to achieving the safe shutdown of the reactor. 11 references, 4 figures, 1 table

  9. The role of lubricant analysis in maximizing lubricant and equipment life

    International Nuclear Information System (INIS)

    Janis, J.

    1995-01-01

    Lubricant analysis has always played an important yet somewhat invisible role in equipment health monitoring. At its most primitive, simple observations and field testing alert equipment operators to changing conditions. At its most advanced, data from performance and analytical tests are used to develop or select optimum lubricants for service, stretch drain intervals, predict remaining equipment life and identify potential equipment or system problems at an incipient stage. Coupled with thermography and vibration analysis, lubricant analysis can become a major component of a comprehensive predictive maintenance (PM) program. Ontario Hydro finds itself at a turning point regarding the use and monitoring of lubricants. Increasing emphasis on equipment reliability and plant life extension, coupled with major, recent changes in lubricant composition in response to environmental, energy and safety concerns, forces an upgrading of many aspects of lubricant monitoring so that it may establish itself as a key part of modern PM practices. This paper discusses some of these aspects. (author)

  10. Upgrading the ATLAS control system

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.

    1993-01-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ''in-house'' software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed

  11. LHC luminosity upgrade detector challenges

    CERN Multimedia

    CERN. Geneva; de Roeck, Albert; Bortoletto, Daniela; Wigmans, Richard; Riegler, Werner; Smith, Wesley H

    2006-01-01

    LHC luminosity upgrade: detector challenges The upgrade of the LHC machine towards higher luminosity (1035 cm -2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: • Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) • Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector developments (lectures 2-4) • Electronics, trigger and data acquisition challenges (lecture 5) Note: the much more ambitious LHC energy upgrade will not be covered

  12. The LHCb Muon Upgrade

    CERN Multimedia

    Cardini, A

    2013-01-01

    The LHCb collaboration is currently working on the upgrade of the experiment to allow, after 2018, an efficient data collection while running at an instantaneous luminosity of 2x10$^{33}$/cm$^{-2}$s$^{-1}$. The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. The muon system will be upgraded in two phases. In the first phase, the off-detector readout electronics will be redesigned to allow complete event readout at 40 MHz. Also, part of the channel logical-ORs, used to reduce the total readout channel count, will be removed to reduce dead-time in critical regions. In a second phase, higher-granularity detectors will replace the ones installed in highly irradiated regions, to guarantee efficient muon system performances in the upgrade data taking conditions.

  13. Studies for the ALICE inner tracking system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Reidt, Felix

    2016-04-28

    The ALICE experiment at the CERN LHC identifies D{sup 0} mesons via secondary-vertex reconstruction and topological cuts to reduce the corresponding combinatorial background in heavy-ion collisions. The D{sup 0} meson is produced promptly in initial, hard scatterings via the strong interaction or as feed-down from weakly decaying B hadrons. Within this thesis, a novel method for the separation of prompt and feed-down D{sup 0} mesons using cut variations was implemented and applied to data from p-Pb collisions at √(s{sub NN})=5.02 TeV. The effectiveness of the secondary-vertex reconstruction strongly depends on the performance and in particular the pointing resolution of the Inner Tracking System. The upgrade of the ALICE Inner Tracking System for the Long Shutdown 2 of the LHC in 2019/2020 will significantly improve its vertex-reconstruction and tracking capabilities. It will be equipped with Monolithic Active Pixel Sensors manufactured using the TowerJazz 180 nm CMOS process on wafers with a high-resistivity epitaxial layer. In another part of this thesis, several pixel-chip prototypes of the ALPIDE architecture with in-pixel amplification and discrimination as well as in-matrix data reduction were characterised. The pALPIDE-2 prototype was measured to fulfil the requirements in terms of detection efficiency, fake-hit rate, position resolution and tolerance to irradiation with non-ionising energy loss. Based on simulations modelling the tracking and vertex-reconstruction performance of the upgraded Inner Tracking System, the perspective of the feed-down separation using cut variations after the upgrade was assessed within this thesis.

  14. Designing the upgrade of the Early Warning System in Slovenia

    International Nuclear Information System (INIS)

    Cindro, M.; Mitic, D.; Stritar, A.

    2004-01-01

    When designing an upgrade of early warning network for radiological emergencies one has to consider physical criteria as well as technical and financial possibilities, making the system the best possible compromise between the above mentioned aspects. In the case of the Slovenian Early Warning System (EWS) upgrade, the design was even harder because of the need to implement the existing measuring sites into the new scheme. We plan to add 35 new locations with external radiation and meteorology measurements to the 42 already existing sites. In the article we will describe the selection criteria for measuring sites and the requirements for the measuring equipment as well as a discussion of the physical quantities that need to be measured. In addition to gamma dose rate measurements, which are essential for radiological emergencies, meteorological measurements also provide vital information for the assessment of the situation. Especially we describe an additional necessary meteorological equipment which has to be installed. Today's communication technologies offer many possibilities for data transfer from the measuring site to the central data gathering unit and one has to choose the most appropriate one, primarily considering reliability but also cost effectiveness. For that reason new measuring sites will be at the locations already used for meteorological measurements by the Environmental Agency of the Republic of Slovenia. The Central Unit (CU) of such a network is the core of the system were all data have to be controlled, analysed and presented to the operator providing him with as much data as possible in a simple and clear fashion. (author)

  15. Upgrader alley : oil sands fever strikes Edmonton

    International Nuclear Information System (INIS)

    Griffiths, M.; Dyer, S.

    2008-01-01

    Large-scale industrial complexes called upgraders are similar to oil refineries. Several upgraders are planned for the area just northeast of Edmonton, known as Upgrader Alley. Concerns have been expressed over the potential congestion and environmental impacts of these upgraders. Upgraders will also attract other industry, and the cumulative effects of development will have major impacts on the region, its people and the natural environment. The report provided an overview of Upgrader Alley, with reference to what is driving development; upgrading issues; what Upgrader Alley will look like; and how much water Upgrader Alley needs. The report also discussed impacts on the land, air quality, and greenhouse gases. Water demand issues were discussed with reference to impacts on the North Saskatchewan River, water levels, water quality, a water management framework, and groundwater resources. Cumulative impacts were also presented. It was concluded that if all the projects for which applications had been submitted were approved, the rapid pace of growth in Upgrader Alley would mimic that of Fort McMurray. If the rate of development were somewhat slower, there would be more time to develop and implement plans to reduce the impacts. 189 refs., 6 tabs., 14 figs

  16. Upgrading of Sergiev Posad department of Moscow NPO Radon

    International Nuclear Information System (INIS)

    Debieve, Pierre; Delecaut, Gregory; Vanleeuw, Daniel

    2007-01-01

    Available in abstract form only. Full text of publication follows: BELGATOM and IRE Consortium has been awarded by the European Commission end of 2005 to conduct a project entitled 'Upgrading of Sergiev Posad Department of Moscow NPO Radon and the assessment of the radiological impact in the area nearby'. The main aims to achieve in the frame of this Europe-aid Project are: - Improvement of the performance and the safety level of the present radwaste management system, taking into account the additional waste expected from the Kurchatov Institute rehabilitation and from the forecast decommissioning of Research Reactors on the territory of Moscow. - Basic design and assistance for the procurement of upgrading equipment related to: - radwaste sorting and pretreatment - replacement of the hydraulic system of the existing super-compactor - characterisation system for radwaste 'Support for preparing the PSAR and PEIAR for new licensing' Assessment of the radiological impact in an area of 50 km radius around Sergiev Posad Department. - The initial duration of this Project is 3 years, starting beginning of 2006. This paper describes the difficulties encountered to start and implement the Project and its status at the half of the planned time schedule. (authors)

  17. Real-time signal communication between diagnostic and control in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Treutterer, Wolfgang; Neu, Gregor; Raupp, Gerhard; Zehetbauer, Thomas; Zasche, Dieter; Lueddecke, Klaus; Cole, Richard

    2010-01-01

    The ASDEX Upgrade tokamak experiment is equipped with a versatile discharge monitoring and control system. It allows to develop and use advanced control algorithms to investigate plasma physics under well-defined conditions with the objective of optimising plasma performance. The achievable quality depends on the accuracy with which the plasma state can be reconstructed from measurements under real-time conditions. Today's advanced algorithms need physics quantities - scalar entities as well as profiles. These are obtained processing huge numbers of raw measurements with complex diagnostic algorithms. Adequate network communication for the resulting signals is crucial to satisfy real-time requirements, especially when several diagnostic systems cooperate in a feedback control loop. Support for the technology of choice, however, is not easily available for all of the diverse, highly specialised diagnostic systems. We give an overview about the methods that have been explored at ASDEX Upgrade for real-time signal transfer. In particular, we investigated reflective shared memory and Ethernet technologies. Our solution strives to combine their strengths. For fast communication on dedicated computing nodes, reflective shared memory is used. For the majority of diagnostic systems producing large data blocks at moderate rates, Ethernet connections with UDP protocol are employed. Following ASDEX Upgrade's framework concept, a software layer hides the networks used from both diagnostic and control applications.

  18. Real-time signal communication between diagnostic and control in ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Treutterer, Wolfgang, E-mail: Wolfgang.Treutterer@ipp.mpg.d [Max-Planck Institut fuer Plasmaphysik, Garching, EURATOM Association (Germany); Neu, Gregor; Raupp, Gerhard; Zehetbauer, Thomas; Zasche, Dieter [Max-Planck Institut fuer Plasmaphysik, Garching, EURATOM Association (Germany); Lueddecke, Klaus; Cole, Richard [Unlimited Computer Systems, Iffeldorf (Germany)

    2010-07-15

    The ASDEX Upgrade tokamak experiment is equipped with a versatile discharge monitoring and control system. It allows to develop and use advanced control algorithms to investigate plasma physics under well-defined conditions with the objective of optimising plasma performance. The achievable quality depends on the accuracy with which the plasma state can be reconstructed from measurements under real-time conditions. Today's advanced algorithms need physics quantities - scalar entities as well as profiles. These are obtained processing huge numbers of raw measurements with complex diagnostic algorithms. Adequate network communication for the resulting signals is crucial to satisfy real-time requirements, especially when several diagnostic systems cooperate in a feedback control loop. Support for the technology of choice, however, is not easily available for all of the diverse, highly specialised diagnostic systems. We give an overview about the methods that have been explored at ASDEX Upgrade for real-time signal transfer. In particular, we investigated reflective shared memory and Ethernet technologies. Our solution strives to combine their strengths. For fast communication on dedicated computing nodes, reflective shared memory is used. For the majority of diagnostic systems producing large data blocks at moderate rates, Ethernet connections with UDP protocol are employed. Following ASDEX Upgrade's framework concept, a software layer hides the networks used from both diagnostic and control applications.

  19. Setting priorities for safeguards upgrades

    International Nuclear Information System (INIS)

    Al-Ayat, R.A.; Judd, B.R.; Patenaude, C.J.; Sicherman, A.

    1987-01-01

    This paper describes an analytic approach and a computer program for setting priorities among safeguards upgrades. The approach provides safeguards decision makers with a systematic method for allocating their limited upgrade resources. The priorities are set based on the upgrades cost and their contribution to safeguards effectiveness. Safeguards effectiveness is measured by the probability of defeat for a spectrum of potential insider and outsider adversaries. The computer program, MI$ER, can be used alone or as a companion to ET and SAVI, programs designed to evaluate safeguards effectiveness against insider and outsider threats, respectively. Setting the priority required judgments about the relative importance (threat likelihoods and consequences) of insider and outsider threats. Although these judgments are inherently subjective, MI$ER can analyze the sensitivity of the upgrade priorities to these weights and determine whether or not they are critical to the priority ranking. MI$ER produces tabular and graphical results for comparing benefits and identifying the most cost-effective upgrades for a given expenditure. This framework provides decision makers with an explicit and consistent analysis to support their upgrades decisions and to allocate the safeguards resources in a cost-effective manner

  20. Cooling system upgrading from 250 kW to 1 MW

    International Nuclear Information System (INIS)

    Anderson, T.V.; Johnson, A.G.; Ringle, J.C.

    1972-01-01

    The Oregon State TRIGA reactor (OSTR) power capability was upgraded from 250 KW to 1 MW in 1969; however, funds were not available for simultaneous upgrading of the cooling system. Since then, the OSTR has been selectively operating at full power with the original 250 KW cooling system. After funds were made available in 1971 the construction on the new heat exchanger building began. The new cooling system was installed, equipment was checked out, corrections were made, and acceptance tests were run. In addition, several days were required to clean up the primary system water, since increased water flow (350 gpm) swirled 4 year's collection of sediment off the reactor tank bottom and into the primary system. Three interesting items have been noticed, which are apparently a result of the cooling system upgrading: (1) the radiation levels above the reactor tank have been reduced by a factor of 2 to 3, (2) a low resonance vibration in the reactor core occurs at 1 MW. The vibration is attributed to a combination of increased water turbulence and subcooled (surface) nucleate boiling, and (3) direct radiation levels from the demineralizer tank have increased approximately 8-fold. This resulted in a relocation of the tank and the use of supplemental shielding. Increased operating time at higher average power levels, plus disturbance of; sediment on the bottom of the reactor tank are believed to be the main sources of the higher radiation levels

  1. Evaluation of sampling equipment for RCRA [Resource Conservation and Recovery Act] monitoring in a deep unconfined aquifer

    International Nuclear Information System (INIS)

    Kasper, R.B.; Serkowski, J.A.

    1988-02-01

    Acceptable sampling devices identified include gas-operated bladder pumps and bailers constructed of nonreactive materials. In arid portions of the western United States, depths to ground water, which are often greater than 100 feet, make the use of bailers extremely time consuming. The efficiency of gas-operated bladder pumps decreases with depth, and special design and construction is often needed to accommodate higher gas pressures. Commercially available sampling pumps were evaluated for their suitability as sampling and purging equipment for installation in monitoring wells in a deep, unconfined aquifer. The test was conducted in a well where the depth to ground water was 340 feet. The objective was to identify equipment capable of discharge rates suitable for sampling (∼0.025 gpm) and, if possible, for purging (>1 gpm). The potential for physical or chemical alteration of the water sample was evaluated from literature sources and not specifically tested. Four positive-displacement pumps were tested, consisting of two bladder pumps, a gas-driven piston pump, and a mechanically-driven pump. All pumps could be installed in a 2-inch diameter well, although this was not important for the planned application. 4 refs., 1 tab

  2. Upgrading instrumentation and control in nuclear power plants. Design criteria

    International Nuclear Information System (INIS)

    Rodriguez Rodriguez, M.C.; Alvarez Menendez, A.

    1997-01-01

    The use of programmed digital technology in Protection, Control, Monitoring and Information Systems in new generation nuclear power plants, or the use of this technology to replace or upgrade existing systems based on wired analog instrumentation and electromechanical relays, has led to new international standards which establish new design requirements or adapt existing requirements to this technology. Additionally, both regulatory organisations and the industry are discussing the reliability of this technology, regarding common mode failures that may occur in redundant protection channels, due to the use of equipment and software with the same characteristics. The first part of this paper addresses the most important aspects of new international standards regarding classification criteria for I and C systems, equipment and functions, depending on their importance to safety and the design criteria applicable to each category. Special attention is drawn to requirements concerning software quality assurance and the design of new control rooms. The paper then goes on to discuss the different technical solutions being implemented, using equipment and software diversification, in order to prevent the possibility of common mode failures affecting the protection function. (Author)

  3. Pipeline transportation of emerging partially upgraded bitumen

    International Nuclear Information System (INIS)

    Luhning, R.W.; Anand, A.; Blackmore, T.; Lawson, D.S.

    2002-01-01

    The recoverable reserves of Canada's vast oil deposits is estimated to be 335 billion barrels (bbl), most of which are in the Alberta oil sands. Canada was the largest import supplier of crude oil to the United States in 2001, followed by Saudi Arabia. By 2011, the production of oil sands is expected to increase to 50 per cent of Canada's oil, and conventional oil production will decline as more production will be provided by synthetic light oil and bitumen. This paper lists the announced oil sands projects. If all are to proceed, production would reach 3,445,000 bbl per day by 2011. The three main challenges regarding the transportation and marketing of this new production were described. The first is to expand the physical capacity of existing pipelines. The second is the supply of low viscosity diluent (such as natural gas condensate or synthetic diluent) to reduce the viscosity and density of the bitumen as it passes through the pipelines. The current pipeline specifications and procedures to transport partially upgraded products are presented. The final challenge is the projected refinery market constraint to process the bitumen and synthetic light oil into consumer fuel products. These challenges can be addressed by modifying refineries and increasing Canadian access in Petroleum Administration Defense District (PADD) II and IV. The technology for partial upgrading of bitumen to produce pipeline specification oil, reduce diluent requirements and add sales value, is currently under development. The number of existing refineries to potentially accept partially upgraded product is listed. The partially upgraded bitumen will be in demand for additional upgrading to end user products, and new opportunities will be presented as additional pipeline capacity is made available to transport crude to U.S. markets and overseas. The paper describes the following emerging partial upgrading methods: the OrCrude upgrading process, rapid thermal processing, CPJ process for

  4. Upgrade of the LHCb ECAL monitoring system

    CERN Document Server

    Guz, Yu

    2015-01-01

    The LHCb ECAL is a shashlik calorimeter of 6016 cells, covering 7.68 x 6.24 m$^2$ area. To monitor the readout chain of each ECAL cell, the LHCb ECAL is equipped with a LED based monitoring system. During the LHC Run I (2009-2012) it was found that the precision of the monitoring suffers from the radiation degradation of transparency of polystyrene clear fibers used to transport the LED light to the ECAL photomultipliers. In order to improve the performance of the monitoring system, and especially in view of significant increase of LHCb working luminosity foreseen after 2018, the present plastic fibers have been replaced by radiation hard quartzfi bers. The performance of the old LHCb ECAL monitoring system during LHC Run I and the design of the upgraded system are discussed here.

  5. Seismic and environmental qualification of class IE equipment manufactured in Spain

    International Nuclear Information System (INIS)

    Gerini, P.; Lumbreras, A.; Naredo, F.

    1978-01-01

    Nuclear power plant instrumentation and control design is affected by several factors such as various plant operating conditions, transient response capability, safety requirements and changes in IEEE standards. Recent upgraded IEEE standards that call for Qualification of all Safety related I anc C equipment, namely IEEE 323 (Qualifying Class IE Electric Equipment for nuclear power generating stations) and its daughter Standard IEEE 344 (Recommended Practices for Seismic Qualification of Class IE Equipment for nuclear power generating stations) have been endorsed by the United States Nuclear Regulatory Commission through the issuance of corresponding Regulatory Guides. The author describes the Qualification requirements applicable to the Class IE I and C Components made in Spain for the different vintages of plants, and the programs implemented or plans established by Westinghouse to fulfill those requirements. (author)

  6. Scientific Equipment Division - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2001-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: - designing of devices and equipment for experiments in physics, their mechanical construction and assembly. In particular, there are vacuum chambers and installations for HV and UHV; - maintenance and upgrading of the existing installations and equipment in our Institute; - participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and a AO plotter, what allows us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop can offer a wide range of machining and treatment methods with satisfactory tolerances and surface quality. It offers the following possibilities: - turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc-type elements of a diameter up to 600 mm and a length not exceeding 300 mm; - milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm; - grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm; - drilling - holes of a diameter up to 50 mm; - welding - electrical and gas welding, including TIG vacuum-tight welding; - soft and hard soldering; - mechanical works including precision engineering; - plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides; - painting - paint spraying with possibility of using furnace-fred drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop posses CNC milling machine which can be used for machining of work-pieces up to 500 kg

  7. The ALICE Inner Tracking System Upgrade

    CERN Document Server

    Siddhanta, Sabyasachi

    2015-01-01

    The long term plan of ALICE (A Large Ion Collider Experiment) at the CERN Large Hadron Collider (LHC) is a detailed investigation and characterisation of the Quark-Gluon Plasma (QGP). ALICE has devised a comprehensive upgrade strategy to enhance its physics capabilities and to exploit the LHC running conditions after the second long shutdown of the LHC scheduled in 2019-20. The upgraded ALICE will focus on high precision measurements of rare probes over a wide range of momenta, which will significantly improve the performance with respect to the present experimental set up. The upgrade strategy is based on the fact that after LS2 LHC will progressively increase its luminosity with Pb beams eventually reaching an interaction rate of about 50 kHz. To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for...

  8. Performance and equipments upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Sim, Bong Shick; Kim, Jung Taek; Lee, Dong Young; Kim, Chang Hwoi; Park, Won Man; Song, Soon Ja; Yoo, Soon Duk; Yang, Kwang Nam

    1997-12-01

    The compact nuclear simulator (CNS) is installed in the Korea Atomic Energy Research Institute (KAERI) Nuclear Training Center in 1988. The CNS has been used for training of non-operator personnel such as NSSS design engineers, maintenance personnel, inspectors of regulatory body, etc. and for test facility of fuzzy control algorithm. The CNS was manufactured by KAERI and Studsvik (now Eurosim) joint project. The CNS mathematical modeling modeled a three loop Westinghouse Pressurizer Water Reactor (PWR), 993 MWe, mostly referred to as the Kori Unit 3 and 4 in Korea. But the main computer (Micro VAX II), a interface card between main computer and operator panel, and a graphic interface system are faced with frequent troubles by obsolescence and lack of spare parts. According to the above reasons, the CNS hardware should be replaced by state of the art equipment. It is planned to replace the main computer with HP workstation, a dedicated interface card with a PLC-based interface system, and a graphic interface system with an X-terminal based full graphics system. The software for a instructor console also will be modified text-based to Motif-based user interface. The Motif-based user interface provides more efficient and easy operation in a instructor console also will be modified text-based to Motif-based user interface. The Motif-based user interface provides more efficient and easy operation in a instructor console. (author). 124 refs., 2 tabs., 24 figs

  9. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  10. Upgradation of an Apple IIe based DC arc atomic emission spectrometer to a PC based system

    International Nuclear Information System (INIS)

    Sampathkumar, R.; Ravindranath, S.V.G.; Patil, P.B.; Deshpande, S.S.; Saha, T.K.; Handu, V.K.

    2004-01-01

    The analysis of Uranium metal and its compounds used as reactor fuel for the presence of impurities especially Cd and B which have a high neutron capture cross section is routinely performed in Spectroscopy Division. The DC Arc Atomic Emission Spectrometer in the Division was employing an Apple IIe computer for performing the control and data acquisition jobs. The system was upgraded to a PC based data acquisition system and the necessary software to perform the spectro chemical analysis has been developed. This becomes necessary in a scenario where the commercially available Atomic Emission Spectrometers are no longer equipped with DC arc source. Also the Apple IIe computer which was performing the control and data acquisition has gone obsolete and its spares are no longer available. Therefore, to derive the benefits of using DC arc as excitation source the system was upgraded to a PC based system. This paper describes the upgraded system and the various software features relating to the mode of data acquisition, method of analysis, data processing etc. implemented as required by the analysts. (author)

  11. Farm Equipment Manufacturing and Maintenance Services by Blacksmiths in Mali

    Directory of Open Access Journals (Sweden)

    O. Djiré

    2004-03-01

    Full Text Available The Office of Niger has largely contributed to the spread of animal traction technology. Draft animals being largely available, the major constraint has been the high price of imported equipment relative to the purchasing power of the farmers. From the 1980s, considerable quantities of animal traction implements have been introduced particularly by the Arpon project. These implements were assembled at a central workshop and distributed to farmers through a medium term credit facility, including purchase of oxen. Meanwhile support was given to the upgrading of the first blacksmiths’ workshops, providing them with basic equipment, on credit. In the Southern Mali cotton production zone as well as in the Segou River plains rice producing area, associations of blacksmiths have also been created. These networks have greatly contributed to the improvement of skills and turn over of their members. Blacksmiths have become the main producers of animal traction equipment in Mali. Also, farmers greatly appreciate after-sales services. Nevertheless, the sector is still handicapped by major constraints, which are the high price of imported steel, the poor distribution network for electricity and its high cost, as well as the actual absence of credit facilities for blacksmiths. Therefore, in 1997, the blacksmiths’ association of the Office of Niger zone, together with those of the two other zones have created the CMDT/ON/ORS Blacksmiths’ Federation. Its main purposes are the provision and distribution of raw materials (steel products, facilitation of workshop upgrading, organization of training and exchange sessions, and promotion of product marketing.

  12. Micromegas Detectors for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00211509

    2016-01-01

    Large area Micromegas (MM) detectors will be employed for the Muon Spectrometer upgrade of the ATLAS experiment at the LHC. A total surface of about $150m^2$ of the forward regions of the Muon Spectrometer will be equipped with 8 layers of MM modules. Each module covers a surface area of approximately 2 to $3 m^2$ for a total active area of $1200 m^2$. Together with the small- strips Thin Gap Chambers, they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS Endcap Muon tracking system in the planned 2018/19 shutdown. This upgrade will mantain a low pt threshold for single muons and provides excellent tracking capabilities for the HL-LHC phase. The NSW project requires fully efficient MM chambers with spatial resolution down to $100 \\mu m$, at rate capability up to about $15kHz/cm^2$ and operation in a moderate (highly inhomogeneous) magnetic field up to B=0.3 T. The required tracking capability is provided by the intrinsic spatial resolution combined with a challengi...

  13. Micromegas Detectors for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    Bianco, Michele; The ATLAS collaboration

    2015-01-01

    Large area Micromegas (MM) detectors will be employed for the Muon Spectrometer upgrade of the ATLAS experiment at the LHC. A total surface of about 150 m2 of the forward regions of the Muon Spectrometer will be equipped with 8 layers of MM modules. Each module covers a surface area of approximately 2 to 3 m$^{2}$ for a total active area of 1200 m$^{2}$. Together with the small-strips Thin Gap Chambers, they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS Endcap Muon tracking system in the planned 2018/19 shutdown. This upgrade will maintain a low pt threshold for single muons and provides excellent tracking capabilities for the HL- LHC phase. The NSW project requires fully efficient MM chambers with spatial resolution down to 100 $ \\mu m$, a rate capability up to about 15 kHz/cm$^{2}$ and operation in a moderate (highly inhomogeneous) magnetic field up to B=0.3 T. The required tracking capability is provided by the intrinsic spatial resolution combined with a cha...

  14. Resistive Micromegas for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00215987; The ATLAS collaboration

    2016-01-01

    Large size resistive micromegas detectors (MM) will be employed for the first time in high-energy physics experiments for the Muon Spectrometer upgrade of the ATLAS experiment at CERN. The current innermost stations of the muon endcap system, the Small Wheel, will be upgraded in 2019 to retain the good precision tracking and trigger capabilities in the high background environment expected with the upcoming luminosity increase of the LHC. Along with the small-strip Thin Gap Chambers (sTGC) the ``New Small Wheel'' will be equipped with eight layers of MM detectors arranged in multilayers of two quadruplets, for a total of about 1200 m$^2$ detection planes. All quadruplets have trapezoidal shapes with surface areas between 2 and 3 m$^2$. The MM system will provide both trigger and tracking capabilities. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, a challenging mechanical precision is required in the construction for each plane of the assembled modules, with an alignment of the reado...

  15. arXiv Architecture of the LHCb muon Frontend control system upgrade

    CERN Document Server

    Bocci, Valerio

    2016-10-06

    The LHCb experiment(Fig. 1), that is presently taking data at CERN (European Center for Nuclear Research) Large Hadron Collider (LHC), aims at the study of CP violation in the B meson sector. Its key elements is the Muon detector [1], which allows triggering, and muon identification from inclusive b decays. The electronic system (Fig. 2) of the whole detector is very complex and its Muon detector Experiment Control System (ECS) allows monitoring and control of a number of Front-End boards in excess of 7000. The present system in charge of controlling Muon detector Front-End (FE) Electronics consists of 10 Crates of equipment; each crate contains two kinds of modules: a Pulse Distribution Module (PDM) and up to 20 Service Boards (SB) connected via a custom Backplane for a total amount of about 800 microcontrollers[2]. LHCb upgrade is planned for 2018/19, which will allow the detector to exploit higher luminosity running. This upgrade will allow the experiment to accumulate more luminosity to allow measurements...

  16. Bohunice V-1. Review of safety upgrading and operating experiences

    International Nuclear Information System (INIS)

    Korec, J.; Kuschel, D.

    2000-01-01

    The Bohunice site in the Slovak Republic has two Russian-designed twin-unit nuclear power plants, one equipped with reactors of the WWER 440/230 type, the other with type WWER 440/213 reactors. Two older units (V-1) started commercial operation in late 1978 and 1980 respectively and have been supplying electricity to the national grid since that time without any events that could have degraded plant safety level. In the period prior to 1990 the utility Slovenske Elektrarne (S.E.) performed extensive modifications and upgrades to the original design of the two older units V-1 NPP. Furthermore, significant steps in safety improvement for Bohunice NPP V-1 have been made since 1990. Following the political restructuring of the former Czechoslovakia and the country's new open-door policy towards western organizations, several international expert missions were focused on evaluation of Bohunice NPP safety status level and operational reliability, particularly targeting the two older units. Based on recommendations of individual expert missions and complementary deterministic and probabilistic safety analyses performed by S.E., the Czechoslovak Nuclear Regulatory Authority issued the Resolution No. 5/91 defining 81 measures concerning further safety and reliability improvement of Bohunice V1 .A range of short-term and long-term upgrades was prioritised in terms of importance to plant safety and work to implement these measures commenced in the early nineties. During the 'Small Reconstruction' from 1991 to 1993 some of the short term upgrading measures were realized to eliminate the most serious safety deficits, thus to achieve a significant reduction in core damage frequency and a major improvement in confinement integrity. In this paper and presentation the goals of the gradual reconstruction project, basic engineering, detailed engineering and realization, last major stage of Unit 2 upgrade, as well as final stage of Unit 1 upgrade in early 2000 are presented

  17. Operability test procedure for TRUSAF assayer software upgrade

    International Nuclear Information System (INIS)

    Cejka, C.C.

    1995-01-01

    This OTP is to be used to ensure the operability of the Transuranic Waste Assay System (TRUWAS). The system was upgraded and requires a retest to assure satisfactory operation. The upgrade consists of an AST 486 computer to replace the IBM-PC/XT, and a software upgrade (CNEUT). The software calculations are performed in the same manner as in the previous system (NEUT), however, the new software is written in C Assembly Language. CNEUT is easier to use and far more powerful than the previous program. The TRUWAS is used to verify the TRU content of waste packages sent for storage in the Transuranic Storage and Assay Facility (TRUSAF). The TRUSAF is part of Westinghouse Hanford's certification program for waste to be shipped to the Waste Isolation Pilot Plant (WIPP) in New Mexico. The Transuranic Waste Assayer uses a combination passive-active neutron interrogation system to determine the TRU content of 55-gallon waste drums. The system consists of a shielded assay chamber; Deuterium-Tritium neutron generator; Helium-3 proportional counters; drum handling system; electronics including preamplifier, amplifier, and discriminator for each of the counter packages; and an AST 486 computer/printer system for data acquisition and analysis. The system can detect down to TRU levels of 10 nCi/g in the waste matrix. The equipment to be tested is: Assay Chamber Door Drum Turntable and Automatic Loading Platform Interlocks Assayer Software; and IBM computer/printer software. The objective of the test is to verify that the system is operational with the AST 486 computer, the software used in the new computer system correctly calculates TRU levels, and the new computer system is capable of storing and retrieving data

  18. Upgrading Custom Simulink Library Components for Use in Newer Versions of Matlab

    Science.gov (United States)

    Stewart, Camiren L.

    2014-01-01

    The Spaceport Command and Control System (SCCS) at Kennedy Space Center (KSC) is a control system for monitoring and launching manned launch vehicles. Simulations of ground support equipment (GSE) and the launch vehicle systems are required throughout the life cycle of SCCS to test software, hardware, and procedures to train the launch team. The simulations of the GSE at the launch site in conjunction with off-line processing locations are developed using Simulink, a piece of Commercial Off-The-Shelf (COTS) software. The simulations that are built are then converted into code and ran in a simulation engine called Trick, a Government off-the-shelf (GOTS) piece of software developed by NASA. In the world of hardware and software, it is not uncommon to see the products that are utilized be upgraded and patched or eventually fade away into an obsolete status. In the case of SCCS simulation software, Matlab, a MathWorks product, has released a number of stable versions of Simulink since the deployment of the software on the Development Work Stations in the Linux environment (DWLs). The upgraded versions of Simulink has introduced a number of new tools and resources that, if utilized fully and correctly, will save time and resources during the overall development of the GSE simulation and its correlating documentation. Unfortunately, simply importing the already built simulations into the new Matlab environment will not suffice as it will produce results that may not be expected as they were in the version that is currently being utilized. Thus, an upgrade execution plan was developed and executed to fully upgrade the simulation environment to one of the latest versions of Matlab.

  19. Upgrades of the ATLAS trigger system

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2018-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. \\\\ By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions ...

  20. Alberta oil sands crudes : upgrading and marketing

    International Nuclear Information System (INIS)

    Ashar, M.

    2008-01-01

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs

  1. Alberta oil sands crudes : upgrading and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Ashar, M. [Suncor Energy, Fort McMurray, AB (Canada)

    2008-05-15

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs.

  2. Proceedings: Electromagnetic interference control in modern digital instrumentation and control upgrades

    International Nuclear Information System (INIS)

    1993-06-01

    A workshop on Electro-Magnetic Interference (EMI) Control in Modern Digital Instrumentation ampersand Control System Upgrade was held in Baltimore on September 10-11, 1992 to provide a forum for technology transfer, technical information exchange, and education. The workshop was attended by more than 70 representatives of electric utilities, equipment manufacturers, engineering consulting organizations, and government agencies. The workshop consists of four sessions: (1) Organizational EMC Perspectives, (2) EMI Environment, Case Histories ampersand Solutions, (3) EMC in Digital Instrumentation ampersand Control Systems, and (4) EMI Utility Needs. A group discussion followed the presentations to identify utility needs. Individual papers have been cataloged separately

  3. A New Readout Electronics for the LHCb Muon Detector Upgrade

    CERN Multimedia

    Cadeddu, Sandro

    2016-01-01

    The 2018/2019 upgrade of LHCb Muon System foresees a 40 MHz readout scheme and requires the development of a new Off Detector Electronics (nODE) board that will be based on the nSYNC, a radiation tolerant custom ASIC developed in UMC 130 nm technology. Each nODE board has 192 input channels processed by 4 nSYNCs. The nSYNC is equipped with fully digital TDCs and it implements all the required functionalities for the readout: bunch crossing alignment, data zero suppression, time measurements. Optical interfaces, based on GBT and Versatile link components, are used to communicate with DAQ, TFC and ECS systems.

  4. To upgrade or not to upgrade

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn; Rose, Jørgen

    2017-01-01

    This paper identifies the key indicators that owners need to take into account in order to choose the most affordable extent of upgrading of a typical post-1945 building. The exterior look of the building is not to be changed. Indicators include measures, risk assessment related to the changes in...

  5. AGS intensity upgrades

    International Nuclear Information System (INIS)

    Roser, T.

    1995-01-01

    After the successful completion of the AGS Booster and several upgrades of the AGS, a new intensity record of 6.3 x 10 13 protons per pulse accelerated to 24 GeV was achieved. The high intensity slow-extracted beam program at the AGS typically serves about five production targets and about eight experiments including three rare Kaon decay experiments. Further intensity upgrades are being discussed that could increase the average delivered beam intensity by up to a factor of four

  6. Upgrading uncompetitive products economically

    DEFF Research Database (Denmark)

    Lu, Hua; Jensen, Christian Søndergaard

    2012-01-01

    for upgrading an uncompetitive product, and combine the solutions into a single solution. We also propose a spatial join-based solution that assumes P and T are indexed by an R-tree. Given a set of products in the same R-tree node, we derive three lower bounds on their upgrading costs. These bounds are employed...

  7. Performance of New and Upgraded Detectors for Luminosity and Beam Condition Measurement at CMS

    CERN Document Server

    Leonard, Jessica Lynn

    2015-01-01

    The beam monitoring and luminosity systems of the CMS experiment are enhanced by several new and upgraded sub-detectors to match the challenges of the LHC operation and physics program at increased energy and higher luminosity. A dedicated pixelated luminosity telescope is installed for a fast and precise luminosity measurement. This detector measures coincidences between several three-layer telescopes of silicon pixel detectors to arrive at luminosity for each colliding LHC bunch pair. An upgraded fast beam conditions monitor measures the particle flux using single crystalline diamond sensors. It is equipped with a dedicated front-end ASIC produced in 130 nm CMOS technology. The excellent time resolution is used to separate collision products from machine induced background, thus serving as online luminosity measurement. A new beam-halo monitor at larger radius exploits Cerenkov light from fused silica to provide direction sensitivity and excellent time resolution to separate incoming and outgoing particles....

  8. A technique for choosing an option for SDH network upgrade

    Directory of Open Access Journals (Sweden)

    V. A. Bulanov

    2014-01-01

    Full Text Available Rapidly developing data transmission technologies result in making the network equipment modernization inevitable. There are various options to upgrade the SDH networks, for example, by increasing the capacity of network overloaded sites, the entire network capacity by replacement of the equipment or by creation of a parallel network, by changing the network structure with the organization of multilevel hierarchy of a network, etc. All options vary in a diversity of parameters starting with the solution cost and ending with the labor intensiveness of their realization. Thus, there are no certain standard approaches to the rules to choose an option for the network development. The article offers the technique for choosing the SHD network upgrade based on method of expert evaluations using as a tool the software complex that allows us to have quickly the quantitative characteristics of proposed network option. The technique is as follows:1. Forming a perspective matrix of services inclination to the SDH networks.2. Developing the several possible options for a network modernization.3. Formation of the list of criteria and a definition of indicators to characterize them by two groups, namely costs of the option implementation and arising losses; positive effect from the option introduction.4. Criteria weight coefficients purpose.5. Indicators value assessment within each criterion for each option by each expert. Rationing of the obtained values of indicators in relation to the maximum value of an indicator among all options.6. Calculating the integrated indicators of for each option by criteria groups.7. Creating a set of Pareto by drawing two criteria groups of points, which correspond to all options in the system of coordinates on the plane. Option choice.In implementation of point 2 the indicators derivation owing to software complex plays a key role. This complex should produce a structure of the network equipment, types of multiplexer sections

  9. The ALICE TPC Upgrad

    Science.gov (United States)

    Castro, Andrew; Alice-Usa Collaboration; Alice-Tpc Collaboration

    2017-09-01

    The Time Projection Chamber (TPC) currently used for ALICE (A Large Ion Collider Experiment at CERN) is a gaseous tracking detector used to study both proton-proton and heavy-ion collisions at the Large Hadron Collider (LHC) In order to accommodate the higher luminosit collisions planned for the LHC Run-3 starting in 2021, the ALICE-TPC will undergo a major upgrade during the next LHC shut down. The TPC is limited to a read out of 1000 Hz in minimum bias events due to the intrinsic dead time associated with back ion flow in the multi wire proportional chambers (MWPC) in the TPC. The TPC upgrade will handle the increase in event readout to 50 kHz for heavy ion minimum bias triggered events expected with the Run-3 luminosity by switching the MWPCs to a stack of four Gaseous Electron Multiplier (GEM) foils. The GEM layers will combine different hole pitches to reduce the dead time while maintaining the current spatial and energy resolution of the existing TPC. Undertaking the upgrade of the TPC represents a massive endeavor in terms of design, production, construction, quality assurance, and installation, thus the upgrade is coordinated over a number of institutes worldwide. The talk will go over the physics motivation for the upgrade, the ALICE-USA contribution to the construction of Inner Read Out Chambers IROCs, and QA from the first chambers built in the U.S

  10. ATLAS Upgrade Programme

    CERN Document Server

    Hillier, S J; The ATLAS collaboration

    2012-01-01

    With the already outstanding LHC luminosity performance, and planned LHC upgrades in the upcoming shutdowns, it is expected that within a short time-scale, the general purpose LHC experiments will have to cope with luminosities beyond their original design. In order to maintain detector performance and sensitivity to expected and new physics processes, ATLAS has defined a continuous upgrade programme which foresees staged enhancements during the next 10 years of operation, and then more widespread changes before the transition to the highest luminosities after 2022. This talk will describe several components of the ATLAS upgrade, focusing in particular on the Inner Detector and Trigger. The Inner Detector faces two challenges in the higher luminosity environment: high particle multiplicities and increased radiation dose. These will be addressed in the short term by a new layer of Pixel detectors, and in the long term by a complete replacement. The Trigger faces an increasingly difficult task of distinguishing...

  11. Towards novel biogas upgrading processes

    Energy Technology Data Exchange (ETDEWEB)

    Privalova, E.

    2013-06-01

    (VOCs) before and after biogas upgrading was studied for biogas produced through anaerobic digestion of waste waters sludge. The ionic liquid [C{sub 4}mim][OAc] demonstrated its feasibility as a promising scrubbing media and exhibited high efficiency in terms of the removal of VOCs. Upon application of this ionic liquid, the amount of identified VOCs was diminished by around 65 wt %, while the samples treated with the aqueous mixture of 15 wt % N-methyldiethanolamine with addition of 5 wt % piperazine resulted in 32 wt % reduction in the amounts of volatile organic compounds only. (orig.)

  12. Modernization of the automation control system of technological processes at the preparation plant in the conditions of technical re-equipment

    Science.gov (United States)

    Lyakhovets, M. V.; Wenger, K. G.; Myshlyaev, L. P.; Shipunov, M. V.; Grachev, V. V.; Melkozerov, M. Yu; Fairoshin, Sh A.

    2018-05-01

    The experience of modernization of the automation control system of technological processes at the preparation plant under the conditions of technical re-equipment of the preparation plant “Barzasskoye Tovarischestvo” LLC (Berezovsky) is considered. The automated process control systems (APCS), the modernization goals and the ways to achieve them are indicated, the main subsystems of the integrated APCS are presented, the enlarged functional and technical structure of the upgraded system is given. The procedure for commissioning an upgraded system is described.

  13. Upgradation of Apsara reactor

    International Nuclear Information System (INIS)

    Mammen, S.; Mukherjee, P.; Bhatnagar, A.; Sasidharan, K.; Raina, V.K.

    2009-01-01

    Apsara is a 1 MW swimming pool type research reactor using high enriched uranium as fuel with light water as coolant and moderator. The reactor is in operation for more than five decades and has been extensively used for basic research, radioisotope production, neutron radiography, detector testing, shielding experiments etc. In view of its long service period, it is planned to carry out refurbishment of the reactor to extend its useful life. During refurbishment, it is also planned to upgrade the reactor to a 2 MW reactor to improve its utilization and to upgrade the structure, system and components in line with the current safety standards. This paper gives a brief account of the design features and safety aspects of the upgraded Apsara reactor. (author)

  14. Development of a Depleted Monolithic CMOS Sensor in a 150 nm CMOS Technology for the ATLAS Inner Tracker Upgrade

    CERN Document Server

    Wang, T.

    2017-01-01

    The recent R&D focus on CMOS sensors with charge collection in a depleted zone has opened new perspectives for CMOS sensors as fast and radiation hard pixel devices. These sensors, labelled as depleted CMOS sensors (DMAPS), have already shown promising performance as feasible candidates for the ATLAS Inner Tracker (ITk) upgrade, possibly replacing the current passive sensors. A further step to exploit the potential of DMAPS is to investigate the suitability of equipping the outer layers of the ATLAS ITk upgrade with fully monolithic CMOS sensors. This paper presents the development of a depleted monolithic CMOS pixel sensor designed in the LFoundry 150 nm CMOS technology, with the focus on design details and simulation results.

  15. Upgrade of the AGS H- linac

    International Nuclear Information System (INIS)

    Alessi, J.G.; Buxton, W.; Kponou, A.; LoDestro, V.; Mapes, M.; McNerney, A.J.; Raparia, D.

    1994-01-01

    The AGS linac presently accelerates 25 mA of H - to 200 MeV at a 5 Hz rep-rate and 500 μs pulse width. The Booster takes 4 pulses every 3.8 seconds, and the remaining pulses are used for isotope production. The authors are in the process of upgrading the linac to increase the average current delivered for isotope production by more than a factor of two, while at the same time expecting to decrease linac downtime. Various aspects of this upgrade are discussed, including the upgrade of the control system, new high power transmission line, transport line vacuum, and rf power supply system upgrades

  16. Biogas Upgrading and Waste-to-Energy | Bioenergy | NREL

    Science.gov (United States)

    Biogas Upgrading and Waste-to-Energy Biogas Upgrading and Waste-to-Energy NREL's waste-to-energy research and development required for upgrading biogas to fuels and high-value co-products. Featured (2014) Biogas Potential in the United States, NREL Fact Sheet (2013) View all NREL biogas upgrading and

  17. The Sustainability of Global Chain Governance: Network Structures and Local Supplier Upgrading in Thailand

    Directory of Open Access Journals (Sweden)

    Sungchul Cho

    2016-09-01

    Full Text Available Although it has been widely accepted that insertion into global production networks may play a critical role in fostering local supplier upgrading, scholars have yet to fully incorporate heterogeneous configurations of buyer-supplier relationships within networks into empirical testing. Using a representative sample of manufacturing firms in Thailand, we propose a more nuanced empirical framework that asks which features of buyer-supplier relationships are related to which aspects of local supplier upgrading. Our findings, derived from latent class analysis, show that the ways value chains are governed can exert varying effects on different types of technological upgrading. Being a multinational corporation (MNC supplier was found to have positive effects on process and minor product upgrading, irrespective of the types of buyer-supplier networks. However, we found a more radical type of upgrading (i.e., the development of own brands to be negatively related to insertion into ‘quasi-hierarchical’ or ‘buyer-driven relationships’, whilst involvement in ‘cooperative networks’ was associated with a significantly higher tendency of product and brand upgrading. Understanding this inherent relationality provides a crucial balance to previous firm-level findings, suggesting that the sustainability of participation in global value chains depends on the relational structures in which local manufacturers are embedded.

  18. Five TWh saved on profitable upgrading

    International Nuclear Information System (INIS)

    Bakken, Stein Arne.

    1999-01-01

    Article. In Norway, a project is planned to evaluate the upgrading potential of the hydroelectric power sector. The article criticizes the authorities for not supporting the upgrading of hydroelectric power plants in their eager to promote the development of wind power. An important contribution of the planned project will be a book from which the utilities may get advice on measures of upgrading. Generators and control systems account for 80% of the faults and interruptions in the power utilities. The turbine technology has made important progress in the 1990s. By pure upgrading measures alone, the turbine efficiencies may be increased enough for an additional 3 TWh to be taken out from the Norwegian hydroelectric power system. Today, the price of imported carbon-based Danish power determines whether the utilities find it profitable to rehabilitate the hydroelectric plants. The energy potential of upgrading is estimated to be 5 TWh. This energy can be generated with known technology and with no serious consequences for the environment

  19. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Carrio, F; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the luminosity will have increased 5-fold compared to the design luminosity (1034 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional luminosity increase by a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to u...

  20. Quantification of glibenclamide in cleaning samples of pharmaceutical equipment through high performance liquid chromatography

    International Nuclear Information System (INIS)

    Baeza Fonte, Alen Nils; Diaz Aguila, Elsa Eneida; Martinez Alfonso; Nancy

    2012-01-01

    to submit a selective analytical method for quantization of glibenclamide in cleaning samples of pharmaceutical equipment using high performance liquid chromatography. The mobile phase consisted of an equal mixing of acetonitrile/phosphate buffer KH 2 PO 4 ; with 0.037 mol/L concentration pH 5.25 and flow of 1.5 mL/min, in a Nucleosil 100 C8 column. Glibenclamide was injected with progesterone as internal standard and using an UV detector= 230 nm

  1. Upgrade trigger: Biannual performance update

    CERN Document Server

    Aaij, Roel; Couturier, Ben; Esen, Sevda; De Cian, Michel; De Vries, Jacco Andreas; Dziurda, Agnieszka; Fitzpatrick, Conor; Fontana, Marianna; Grillo, Lucia; Hasse, Christoph; Jones, Christopher Rob; Le Gac, Renaud; Matev, Rosen; Neufeld, Niko; Nikodem, Thomas; Polci, Francesco; Del Buono, Luigi; Quagliani, Renato; Schwemmer, Rainer; Seyfert, Paul; Stahl, Sascha; Szumlak, Tomasz; Vesterinen, Mika Anton; Wanczyk, Joanna; Williams, Mark Richard James; Yin, Hang; Zacharjasz, Emilia Anna

    2017-01-01

    This document presents the performance of the LHCb Upgrade trigger reconstruction sequence, incorporating changes to the underlying reconstruction algorithms and detector description since the Trigger and Online Upgrade TDR. An updated extrapolation is presented using the most recent example of an Event Filter Farm node.

  2. ATLAS Calorimeters: Run-2 performance and Phase-II upgrade

    CERN Document Server

    Boumediene, Djamel Eddine; The ATLAS collaboration

    2017-01-01

    The ATLAS detector was designed and built to study proton-proton collisions produced at the LHC at centre-of-mass energies up to 14 TeV and instantaneous luminosities up to 10^{34} cm^{−2} s^{−1}. A liquid argon (LAr)-lead sampling calorimeter is employed as electromagnetic calorimeter and hadronic calorimter, except in the barrel region, where a scintillator-steel sampling calorimeter (TileCal) is used as hadronic calorimter. This presentation will give first an overview of the detector operation and data quality, as well as the achieved performance of the ATLAS calorimetry system. Additionally, the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC) will be presented. For the HL-LHC, the instantaneous luminosity is expected to increase up to L ≃ 7.5 × 10^{34} cm^{−2} s^{−1} and the average pile-up up to 200 interactions per bunch crossing. The major R&D item is the upgrade of the electronics for both LAr and Tile calorimeters in order to cope wit...

  3. ATLAS calorimeters: Run-2 performances and Phase-II upgrades

    CERN Document Server

    Boumediene, Djamel Eddine; The ATLAS collaboration

    2017-01-01

    The ATLAS detector was designed and built to study proton-proton collisions produced at the LHC at centre-of-mass energies up to 14 TeV and instantaneous luminosities up to $10^{34} cm^{-2} s^{-1}$. A Liquid Argon-lead sampling (LAr) calorimeter is employed as electromagnetic and hadronic calorimeters, except in the barrel region, where a scintillator-steel sampling calorimeter (TileCal) is used as hadronic calorimeter. This presentation gives first an overview of the detector operation and data quality, as well as of the achieved performances of the ATLAS calorimetry system. Additionally the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC) are presented. For the HL-LHC, the instantaneous luminosity is expected to increase up to $L \\simeq 7.5 × 10^{34} cm^{-2} s^{-1}$ and the average pile-up up to 200 interactions per bunch crossing. The major R&D item is the upgrade of the electronics for both LAr and Tile calorimeters in order to cope with longer latenc...

  4. Processing options for bitumen upgrading

    International Nuclear Information System (INIS)

    Harji, A.N.; Koppel, P.E.; Mazurek, W.L.; Meysami, P.

    2003-01-01

    It is estimated that 178 billion barrels of oil can be recovered from Alberta's vast heavy oil reserves. The challenge lies in the logistics of recovering, upgrading and transporting the oil to market. The Canadian Energy Research Institute conducted a recent study to determine market potential by 2007 for diluted bitumen and synthetic crude oil produced from upgraded bitumen. The viability for a wide range of bitumen feedstocks was assessed along with the sensitivity of refinery demand to their prices. The 3 major markets for western Canadian bitumen include PADD 2 in the United States, western Canada, and Ontario. Bitumen is too viscous to transport by pipeline and cannot be processed by most of the existing refineries. Therefore, in order to develop a mass market for the product, bitumen must undergo the energy intensive upgrading process at existing refineries. The factors impacting which method of upgrading is most suitable were discussed with particular attention to the impact that Canada's ratification of the Kyoto Protocol may have on Alberta's bitumen resource in terms of costs of complying with greenhouse gas reduction initiatives. The authors emphasized that it is crucial to customize an upgrading project to meet site and market specific factors. 8 refs., 3 tabs., 3 figs

  5. Reactivity initiated accident analyses for the safety assessment of upgraded JRR-3

    International Nuclear Information System (INIS)

    Harami, Taikan; Uemura, Mutsumi; Ohnishi, Nobuaki

    1984-08-01

    JRR-3, currently a heavy water moderated and cooled 10 MW reactor, is to be upgraded to a light water moderated and cooled, heavy water reflected 20 MW reactor. This report describes the analytical results of reactivity initiated accidents for the safety assessment of upgraded JRR-3. The following five cases have been selected for the assessment; (1) uncontrolled control rod withdrawal from zero power, (2) uncontrolled control rod withdrawal from full power, (3) removal of irradiation samples, (4) increase of primary coolant flow, (5) failure of heavy water tank. Parameter studies have been made for each of the above cases to cover possible uncertainties. All analyses have been made by a computer code EUREKA-2. The results show that the safety criteria for upgraded JRR-3 are all met and the adequacy of the design is confirmed. (author)

  6. Safety design concept and analysis for the upgrading JRR-3

    International Nuclear Information System (INIS)

    Onishi, N.; Isshiki, M.; Takahashi, H.; Takayanagi, M.

    1990-01-01

    The Research Reactor No.3 (JRR-3) is under reconstruction for upgrading. This paper describes the safety design concepts of the architectural and engineering design, anticipated operational transients and accident conditions which are the postulated initiating events for the safety evaluation, and the safety criteria of the upgraded JRR-3. The safety criteria are defined taking into account those of Light Water Reactors and the characteristics of the research reactor. Using the example of the safety analysis, this paper describes analytical results of a reactivity insertion by removal of in-core irradiation samples, a pipeline break at the primary coolant loop and flow blockage to a coolant channel, which are the severest postulated initiating events of the JRR-3

  7. Pulsed power supply for Nova Upgrade

    International Nuclear Information System (INIS)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C.

    1992-01-01

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 μm light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps

  8. Hydrogen alternatives for a regional upgrader

    International Nuclear Information System (INIS)

    Bailey, R.T.; Padamsey, R.

    1991-01-01

    For a proposed regional upgrader in Alberta, hydrogen will be needed to upgrade the bitumen and heavy oil to be processed by that facility. The upgrader will rely on high conversion hydrocracking which consumes 3.4 wt % hydrogen to produce a 106% volume yield of high quality synthetic crude. The costs of producing hydrogen via steam reforming of methane, partial oxidation of coal or upgrading residues, and electrolysis are compared, showing that steam reforming is the cheapest. However, an even cheaper source of hydrogen is available in the Edmonton and Fort Saskatchewan area as byproducts from petrochemical plants. An economic analysis is presented of a proposed scheme to capture, purify, compress, and transfer hydrogen from one or two such plants to a nearby regional upgrader. The two plants could supply a total of 126.6 million ft 3 /d of hydrogen at a total installed capital cost of about half of that of a steam reforming plant of equivalent size. When operating costs are added (including the cost of replacing the hydrogen, currently used as fuel at the two plants, with natural gas), the total cost of hydrogen is substantially less than the costs for a hydrogen plant within the upgrader. 3 refs., 5 figs., 4 tabs

  9. ATLAS Upgrade Plans

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000/fb by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new...

  10. Governance and Upgrading Practices in Cloth Production Value Chain

    African Journals Online (AJOL)

    This study examines the governance _pal/ern and upgrading _practices of value chain of cloth _production, focusing on micro and small cloth _producing entetprises in Addis Ababa. The study is based on a sample of 222 respondents drawn from various actors of the value chain in the city. The value chain is found out to ...

  11. The front-end data conversion and readout electronics for the CMS ECAL upgrade

    CERN Document Server

    Mazza, Gianni

    2017-01-01

    The High Luminosity LHC (HL-LHC) will require a significant upgrade of the readout electronics for the CMS Electromagnetic Calorimeter (ECAL). The Very Front-End (VFE) output signal will be sampled at 160 MS/s (i.e. four times the current sampling rate) with 13 bit resolution. Therefore, a high-speed, high-resolution ADC is required. Moreover, each readout channel will produce 2.08 Gb/s, thus requiring fast data transmission circuitry. A new readout architecture, based on two 12 bit, 160 MS/s ADCs, lossless data compression algorithms and fast serial links have been developed for the ECAL upgrade. These functions will be integrated in a single ASIC which is currently under design in a commercial CMOS 65 nm technology using radiation damage mitigation techniques.

  12. US utility I ampersand C upgrade initiative

    International Nuclear Information System (INIS)

    Wilkinson, D.

    1993-01-01

    This paper describes an initiative which is being pursued to address the problems associated with the increasing obsolescence of instrumentation and control (I ampersand C) systems in nuclear power plants. Such efforts will improve safety, availability, and reliability of plant operation. The program presented is a joint plan between EPRI, utilities, and vendors, to bring about the development of technology to meet these needs, to encourage the private sector to develop such technology, and to prove to utilities the value and utility in applying such technology to upgrade their facilities. Part of this plan is demonstration programs where plant-wide sensor and I ampersand C improvements can be implemented, in a documented manner, to provide R ampersand D information on their performance, functionality, and reliability. The intent is to reduce the costs and shorten the learning curve associated with the utilization of modern I ampersand C equipment

  13. OMEGA Upgrade preliminary design

    International Nuclear Information System (INIS)

    Craxton, R.S.

    1989-10-01

    The OMEGA laser system at the Laboratory for Laser Energetics of the University of Rochester is the only major facility in the United States capable of conducting fully diagnosed, direct-drive, spherical implosion experiments. As such, it serves as the national Laser Users Facility, benefiting scientists throughout the country. The University's participation in the National Inertial Confinement Fusion (ICF) program underwent review by a group of experts under the auspices of the National Academy of Sciences (the Happer Committee) in 1985. The Happer Committee recommended that the OMEGA laser be upgraded in energy to 30 kJ. To this end, Congress appropriated $4,000,000 for the preliminary design of the OMEGA Upgrade, spread across FY88 and FY89. This document describes the preliminary design of the OMEGA Upgrade. The proposed enhancements to the existing OMEGA facility will result in a 30-kHJ, 351-nm, 60-beam direct-drive system, with a versatile pulse-shaping facility and a 1%--2% uniformity of target drive. The Upgrade will allow scientists to explore the ignition-scaling regime, and to study target behavior that is hydrodynamically equivalent to that of targets appropriate for a laboratory microfusion facility (LMF). In addition, it will be possible to perform critical interaction experiments with large-scale-length uniformly irradiated plasmas

  14. Alaska Seismic Network Upgrade and Expansion

    Science.gov (United States)

    Sandru, J. M.; Hansen, R. A.; Estes, S. A.; Fowler, M.

    2009-12-01

    AEIC (Alaska Earthquake Information Center) has begun the task of upgrading the older regional seismic monitoring sites that have been in place for a number of years. Many of the original sites (some dating to the 1960's) are still single component analog technology. This was a very reasonable and ultra low power reliable system for its day. However with the advanced needs of today's research community, AEIC has begun upgrading to Broadband and Strong Motion Seismometers, 24 bit digitizers and high-speed two-way communications, while still trying to maintain the utmost reliability and maintaining low power consumption. Many sites have been upgraded or will be upgraded from single component to triaxial broad bands and triaxial accerometers. This provided much greater dynamic range over the older antiquated technology. The challenge is compounded by rapidly changing digital technology. Digitizersand data communications based on analog phone lines utilizing 9600 baud modems and RS232 are becoming increasingly difficult to maintain and increasingly expensive compared to current methods that use Ethernet, TCP/IP and UDP connections. Gaining a reliable Internet connection can be as easy as calling up an ISP and having a DSL connection installed or may require installing our own satellite uplink, where other options don't exist. LANs are accomplished with a variety of communications devices such as spread spectrum 900 MHz radios or VHF radios for long troublesome shots. WANs are accomplished with a much wider variety of equipment. Traditional analog phone lines are being used in some instances, however 56K lines are much more desirable. Cellular data links have become a convenient option in semiurban environments where digital cellular coverage is available. Alaska is slightly behind the curve on cellular technology due to its low population density and vast unpopulated areas but has emerged into this new technology in the last few years. Partnerships with organizations

  15. Initial results in SST-1 after up-gradation

    Science.gov (United States)

    Pradhan, S.; Khan, Z.; Tanna, V. L.; Prasad, U.; Paravastu, Y.; Raval, D. C.; Masand, H.; Kumar, Aveg; Dhongde, J. R.; Jana, S.; Kakati, B.; Patel, K. B.; Bhandarkar, M. K.; Shukla, B. K.; Ghosh, D.; Patel, H. S.; Parekh, T. J.; Mansuri, I. A.; Dhanani, K. R.; Varadharajulu, A.; Khristi, Y. S.; Biswas, P.; Gupta, C. N.; George, S.; Semwal, P.; Sharma, D. K.; Gulati, H. K.; Mahajan, K.; Praghi, B. R.; Banaudha, M.; Makwana, A. R.; Chudasma, H. H.; Kumar, M.; Manchanda, R.; Joisa, Y. S.; Asudani, K.; Pandya, S. N.; Pathak, S. K.; Banerjee, S.; Patel, P. J.; Santra, P.; Pathan, F. S.; Chauhan, P. K.; Khan, M. S.; Thankey, P. L.; Prakash, A.; Panchal, P. N.; Panchal, R. N.; Patel, R. J.; Mahsuria, G. I.; Sonara, D. P.; Patel, K. M.; Jayaswal, S. P.; Sharma, M.; Patel, J. C.; Varmora, P.; Srikanth, G. L. N.; Christian, D. R.; Garg, A.; Bairagi, N.; Babu, G. R.; Panchal, A. G.; Vora, M. M.; Singh, A. K.; Sharma, R.; Nimavat, H. D.; Shah, P. R.; Purwar, G.; Raval, T. Y.; Sharma, A. L.; Ojha, A.; Kumar, S.; Ramaiya, N. K.; Siju, V.; Gopalakrishna, M. V.; Kumar, A.; Sharma, P. K.; Atrey, P. K.; Kulkarni, SV; Ambulkar, K. K.; Parmar, P. R.; Thakur, A. L.; Raval, J. V.; Purohit, S.; Mishra, P. K.; Adhiya, A. N.; Nagora, U. C.; Thomas, J.; Chaudhari, V. K.; Patel, K. G.; Dalakoti, S.; Virani, C. G.; Gupta, S.; Kumar, Ajay; Chaudhari, B.; Kaur, R.; Srinivasan, R.; Raju, D.; Kanabar, D. H.; Jha, R.; Das, A.; Bora, D.

    2017-04-01

    SST-1 Tokamak has recently completed the 1st phase of up-gradation with successful installation and integration of all its First Wall components. The First Wall of SST-1 comprises of ∼ 3800 high heat flux compatible graphite tiles being assembled and installed on 132 CuCrZr heat sink back plates engraved with ∼ 4 km of leak tight baking and cooling channels in five major sub groups equipped with ∼ 400 sensors and weighing ∼ 6000 kg in total in thirteen isolated galvanic and six isolated hydraulic circuits. The phase-1 up-gradation spectrum also includes addition of Supersonic Molecular Beam Injection (SMBI) both on the in-board and out-board side, installation of fast reciprocating probes, adding some edge plasma probe diagnostics in the SOL region, installation and integration of segmented and up-down symmetric radial coils aiding/controlling plasma rotations, introduction of plasma position feedback and density controls etc. Post phase-I up-gradation spanning from Nov 2014 till June 2016, initial plasma experiments in up-graded SST-1 have begun since Aug 2016 after a brief engineering validation period in SST-1. The first experiments in SST-1 have revealed interesting aspects on the ‘eddy currents in the First Wall support structures’ influencing the ‘magnetic Null evolution dynamics’ and the subsequent plasma start-up characteristics after the ECH pre-ionization, the influence of the first walls on the ‘field errors’ and the resulting locked modes observed, the magnetic index influencing the evolution of the equilibrium of the plasma column, low density supra-thermal electron induced discharges and normal ohmic discharges etc. Presently; repeatable ohmic discharges regimes in SST-1 having plasma currents in excess of 65 KA (qa ∼ 3.8, BT = 1.5 T) with a current ramp rates ∼ 1.2 MA/s over a duration of ∼ 300 ms with line averaged densities ∼ 0.8 × 1019 and temperatures ∼ 200 eV with copious MHD signatures have been experimentally

  16. Upgrading safety systems of industrial irradiation facilities

    International Nuclear Information System (INIS)

    Gomes, R.S.; Gomes, J.D.R.L.; Costa, E.L.C.; Costa, M.L.L.; Thomé, Z.D.

    2017-01-01

    The first industrial irradiation facility in operation in Brazil was designed in the 70s. Nowadays, twelve commercial and research facilities are in operation and two already decommissioned. Minor modifications and upgrades, as sensors replacement, have been introduced in these facilities, in order to reduce the technological gap in the control and safety systems. The safety systems are designed in agreement with the codes and standards at the time. Since then, new standards, codes and recommendations, as well as lessons learned from accidents, have been issued by various international committees or regulatory bodies. The rapid advance of the industry makes the safety equipment used in the original construction become obsolete. The decreasing demand for these older products means that they are no longer produced, which can make it impossible or costly to obtain spare parts and the expansion of legacy systems to include new features. This work aims to evaluate existing safety systems at Brazilian irradiation facilities, mainly the oldest facilities, taking into account the recommended IAEA's design requirements. Irrespective of the fact that during its operational period no event with victims have been recorded in Brazilian facilities, and that the regulatory inspections do not present any serious deviations regarding the safety procedures, it is necessary an assessment of safety system with the purpose of bringing their systems to 'the state of the art', avoiding their rapid obsolescence. This study has also taken into account the knowledge, concepts and solutions developed to upgrading safety system in irradiation facilities throughout the world. (author)

  17. Upgrading safety systems of industrial irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gomes, R.S.; Gomes, J.D.R.L.; Costa, E.L.C.; Costa, M.L.L., E-mail: rogeriog@cnen.gov.br, E-mail: jlopes@cnen.gov.br, E-mail: evaldo@cnen.gov.br, E-mail: mara@cnen.gov.br [Comissão Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil). Diretoria de Radioproteção e Segurança Nuclear; Thomé, Z.D., E-mail: zielithome@gmail.com [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil). Seção de Engenharia Nuclear

    2017-07-01

    The first industrial irradiation facility in operation in Brazil was designed in the 70s. Nowadays, twelve commercial and research facilities are in operation and two already decommissioned. Minor modifications and upgrades, as sensors replacement, have been introduced in these facilities, in order to reduce the technological gap in the control and safety systems. The safety systems are designed in agreement with the codes and standards at the time. Since then, new standards, codes and recommendations, as well as lessons learned from accidents, have been issued by various international committees or regulatory bodies. The rapid advance of the industry makes the safety equipment used in the original construction become obsolete. The decreasing demand for these older products means that they are no longer produced, which can make it impossible or costly to obtain spare parts and the expansion of legacy systems to include new features. This work aims to evaluate existing safety systems at Brazilian irradiation facilities, mainly the oldest facilities, taking into account the recommended IAEA's design requirements. Irrespective of the fact that during its operational period no event with victims have been recorded in Brazilian facilities, and that the regulatory inspections do not present any serious deviations regarding the safety procedures, it is necessary an assessment of safety system with the purpose of bringing their systems to 'the state of the art', avoiding their rapid obsolescence. This study has also taken into account the knowledge, concepts and solutions developed to upgrading safety system in irradiation facilities throughout the world. (author)

  18. Superconducting magnet development for the LHC upgrades

    International Nuclear Information System (INIS)

    Rossi, Lucio

    2012-01-01

    LHC is now delivering proton and heavy ion collisions at the highest energy. Upgrading the LHC beyond its design performance is a long term program that started during the LHC construction, with some fundamental R and D programs. The upgrade program is based on a vigorous superconductor and magnet R and D, aimed at increasing the field in accelerator magnets from 8 T to 12 T for the luminosity upgrade, with the scope of increasing the collider luminosity by a factor 5 to 10 from 2022. The upgrade program might continue with the LHC energy upgrade, which would require magnets producing field in the range of 16-20 T. The results obtained so far and the future challenges are discussed together with the possible plan to reach the goals. (author)

  19. Completion of the brightness upgrade of the ALS

    International Nuclear Information System (INIS)

    Steier, C; Madur, A; Bailey, B; Berg, K; Biocca, A; Black, A; Casey, P; Colomb, D; Gunion, B; Li, N; Marks, S; Nishimura, H; Pappas, C; Petermann, K; Portmann, G; Prestemon, S; Rawlins, A; Robin, D; Rossi, S; Scarvie, T

    2014-01-01

    The Advanced Light Source (ALS) at Berkeley Lab remains one of the brightest sources for soft x-rays worldwide. A multiyear upgrade of the ALS is underway, which includes new and replacement x-ray beamlines, a replacement of many of the original insertion devices and many upgrades to the accelerator. The accelerator upgrade that affects the ALS performance most directly is the ALS brightness upgrade [1], which reduces the horizontal emittance from 6.3 to 2.0 nm (2.5 nm effective). Magnets for this upgrade were installed in late 2012 and early 2013 followed by user operation with the reduced emittance.

  20. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2012-01-01

      Good progress is being made on the projects that will be installed during LS1. CSC chamber production for ME4/2 is progressing at a rate of four chambers per month, with 25 built so far, and the new electronics for ME1/1 is undergoing a pre-production integration testing. For the RPC chambers, gap production is underway with first deliveries to the chamber assembly sites at CERN and Ghent. The third site at Mumbai will begin production next month. For the PMT replacement in the forward hadron calorimeters (HF), the 1728 PMTs are all characterised and ready to be installed. Testing of the electronics boards is going well. Preparations to replace the HPDs in the outer calorimeter (HO) with SiPMs are also on-track. All components are at CERN and burn-in of the new front-end electronics is proceeding. There are three major upgrade projects targeting the period from LS1 through LS2: a new pixel detector, upgraded photo-detectors and electronics for HCAL, and development of a new L1 Trigger. The new ...

  1. UPGRADES

    CERN Multimedia

    Didier Contardo

    2012-01-01

      The CMS Upgrade Programme is making good progress on the LS1 and Phase 1 projects, in the planning for Phase 2. The construction of the ME4/2 muon chambers to be installed during LS1 has started and the two first CSC production chambers have been fully qualified. The three muon groups have recently established a set of milestones towards the completion of their project, that will be integrated in the detailed planning and scheduling for the shutdown work established by Technical Coordination. The project to replace the photo-detectors in the HF and HO calorimeters is also well advanced and at the validation stage. The operation of an HF slice with new multi-anode PMTs and back-end electronics has already been demonstrated in 2012. For the Phase 1 data-taking, as discussed in the Chamonix workshop, it is likely that the LHC performance will exceed the nominal luminosity and pile-up before the second shutdown, still scheduled in 2018. The collaboration is therefore pursuing a strategy to upgrade ...

  2. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    The three post-LS1 Phase 1 Upgrade projects (the L1-Trigger, Pixel Tracker, and HCAL) are all making excellent progress and are transitioning from the prototype to the execution phase. Meanwhile plans are developing for Phase 2, a major Upgrade programme targeting the third long shutdown, LS3. News on Phase 1 is included under the respective projects; we only provide a brief summary here. Phase 1 The plan for the L1 Trigger relies on the installation during the present shutdown of optical splitting for the Trigger input signals. This will allow the new Trigger system to be brought online and fully commissioned during beam operation in 2015, while CMS relies on the existing legacy Trigger for physics. Once fully commissioned the experiment can switch over to the new Trigger, which will provide greatly improved performance at high event pile-up, by 2016. System tests of the splitter system, and of the new architecture of the calorimeter trigger were very successful, and the work in LS1 is on-track. Prototype ...

  3. Parametric study on the thermal performance of beam screen samples of the High-Luminosity LHC upgrade

    Science.gov (United States)

    Borges de Sousa, P.; Morrone, M.; Hovenga, N.; Garion, C.; van Weelderen, R.; Koettig, T.; Bremer, J.

    2017-12-01

    The High-Luminosity upgrade of the Large Hadron Collider (HL-LHC) will increase the accelerator’s luminosity by a factor 10 beyond its original design value, giving rise to more collisions and generating an intense flow of debris. A new beam screen has been designed for the inner triplets that incorporates tungsten alloy blocks to shield the superconducting magnets and the 1.9 K superfluid helium bath from incoming radiation. These screens will operate between 60 K and 80 K and are designed to sustain a nominal head load of 15 Wm-1, over 10 times the nominal heat load for the original LHC design. Their overall new and more complex design requires them and their constituent parts to be characterised from a thermal performance standpoint. In this paper we describe the experimental parametric study carried out on two principal thermal components: a representative sample of the beam screen with a tungsten-based alloy block and thermal link and the supporting structure composed of an assembly of ceramic spheres and titanium springs. Results from both studies are shown and discussed regarding their impact on the baseline considerations for the thermal design of the beam screens.

  4. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    The polymetallic nodules occur at an average depth of 4500 m. Adequate equipment and techniques are required for the exploration at such depths. Shipboard and various laboratory equipments for the sampling of polymetallic nodules is described...

  5. Neutron radiography (NRAD) reactor 64-element core upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Bess, John D. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-03-01

    The neutron radiography (NRAD) reactor is a 250 kW TRIGA (registered) (Training, Research, Isotopes, General Atomics) Mark II , tank-type research reactor currently located in the basement, below the main hot cell, of the Hot Fuel Examination Facility (HFEF) at the Idaho National Laboratory (INL). It is equipped with two beam tubes with separate radiography stations for the performance of neutron radiography irradiation on small test components. The interim critical configuration developed during the core upgrade, which contains only 62 fuel elements, has been evaluated as an acceptable benchmark experiment. The final 64-fuel-element operational core configuration of the NRAD LEU TRIGA reactor has also been evaluated as an acceptable benchmark experiment. Calculated eigenvalues differ significantly (approximately ±1%) from the benchmark eigenvalue and have demonstrated sensitivity to the thermal scattering treatment of hydrogen in the U-Er-Zr-H fuel.

  6. Upgrading of the KSU simulators with new digital I and C systems

    International Nuclear Information System (INIS)

    Randen, K.

    1997-01-01

    Nearly all Swedish nuclear power plants, 9 ABB Atom BWRs and 3 Westinghouse PWRs in total, are presently in various stages of modernizing their I and C systems. This includes also major changes to the main control room with the introduction of large numbers of workstations for soft process control and supervision. These modernization programs also have implications on the seven plant specific full-scope simulators used at the KSU Nuclear Training and Safety Center for operator training. The utilities are considering this training to be an integral part of their programs and have requested KSU to provide training of operators before commissioning of the new equipment in the plants. There is also a request to validate modified operating procedures with the new I and C systems integrated into the simulators. Since the utilities are using different vendors, KSU is now Working with equipment from three vendors in the upgrading of the simulators. (author)

  7. Physical protection upgrades in Ukraine

    International Nuclear Information System (INIS)

    Djakov, A.

    1998-01-01

    The U.S. DOE is providing nuclear material safeguards assistance in both material control and accountability and in physical protection to several facilities in Ukraine. This paper summarizes the types of physical protection upgrades that have been or are presently being implemented at these facilities. These facilities include the Kiev Institute for Nuclear Research, Kharkov Institute of Physics and Technology, Sevastopol Institute of Nuclear Energy and Industry, and the South Ukraine Nuclear Power Plant. Typical upgrades include: hardening of storage areas; improvements in access control, intrusion detection, and CCTV assessment; central alarm station improvements; and implementation of new voice communication systems. Methods used to implement these upgrades and problems encountered are discussed. Training issues are also discussed

  8. Commissioning of inline ECE system within waveguide based ECRH transmission systems on ASDEX upgrade

    Directory of Open Access Journals (Sweden)

    Donné A.J.H.

    2012-09-01

    Full Text Available A CW capable inline electron cyclotron emission (ECE separation system for feedback control, featuring oversized corrugated waveguides, is commissioned on ASDEX upgrade (AUG. The system is based on a combination of a polarization independent, non-resonant, Mach-Zehnder diplexer equipped with dielectric plate beam splitters [2, 3] employed as corrugated oversized waveguide filter, and a resonant Fast Directional Switch, FADIS [4, 5, 6, 7] as ECE/ECCD separation system. This paper presents an overview of the system, the low power characterisation tests and first high power commissioning on AUG.

  9. Commissioning of inline ECE system within waveguide based ECRH transmission systems on ASDEX upgrade

    Science.gov (United States)

    Bongers, W. A.; Kasparek, W.; Doelman, N.; van den Braber, R.; van den Brand, H.; Meo, F.; de Baar, M. R.; Amerongen, F. J.; Donné, A. J. H.; Elzendoorn, B. S. Q.; Erckmann, V.; Goede, A. P. H.; Giannone, L.; Grünwald, G.; Hollman, F.; Kaas, G.; Krijger, B.; Michel, G.; Lubyako, L.; Monaco, F.; Noke, F.; Petelin, M.; Plaum, B.; Purps, F.; ten Pierik, J. G. W.; Schüller, C.; Slob, J. W.; Stober, J. K.; Schütz, H.; Wagner, D.; Westerhof, E.; Ronden, D. M. S.

    2012-09-01

    A CW capable inline electron cyclotron emission (ECE) separation system for feedback control, featuring oversized corrugated waveguides, is commissioned on ASDEX upgrade (AUG). The system is based on a combination of a polarization independent, non-resonant, Mach-Zehnder diplexer equipped with dielectric plate beam splitters [2, 3] employed as corrugated oversized waveguide filter, and a resonant Fast Directional Switch, FADIS [4, 5, 6, 7] as ECE/ECCD separation system. This paper presents an overview of the system, the low power characterisation tests and first high power commissioning on AUG.

  10. Upgrades of DARWIN, a dose and spectrum monitoring system applicable to various types of radiation over wide energy ranges

    Science.gov (United States)

    Sato, Tatsuhiko; Satoh, Daiki; Endo, Akira; Shigyo, Nobuhiro; Watanabe, Fusao; Sakurai, Hiroki; Arai, Yoichi

    2011-05-01

    A dose and spectrum monitoring system applicable to neutrons, photons and muons over wide ranges of energy, designated as DARWIN, has been developed for radiological protection in high-energy accelerator facilities. DARWIN consists of a phoswitch-type scintillation detector, a data-acquisition (DAQ) module for digital waveform analysis, and a personal computer equipped with a graphical-user-interface (GUI) program for controlling the system. The system was recently upgraded by introducing an original DAQ module based on a field programmable gate array, FPGA, and also by adding a function for estimating neutron and photon spectra based on an unfolding technique without requiring any specific scientific background of the user. The performance of the upgraded DARWIN was examined in various radiation fields, including an operational field in J-PARC. The experiments revealed that the dose rates and spectra measured by the upgraded DARWIN are quite reasonable, even in radiation fields with peak structures in terms of both spectrum and time variation. These results clearly demonstrate the usefulness of DARWIN for improving radiation safety in high-energy accelerator facilities.

  11. Upgrades of DARWIN, a dose and spectrum monitoring system applicable to various types of radiation over wide energy ranges

    International Nuclear Information System (INIS)

    Sato, Tatsuhiko; Satoh, Daiki; Endo, Akira; Shigyo, Nobuhiro; Watanabe, Fusao; Sakurai, Hiroki; Arai, Yoichi

    2011-01-01

    A dose and spectrum monitoring system applicable to neutrons, photons and muons over wide ranges of energy, designated as DARWIN, has been developed for radiological protection in high-energy accelerator facilities. DARWIN consists of a phoswitch-type scintillation detector, a data-acquisition (DAQ) module for digital waveform analysis, and a personal computer equipped with a graphical-user-interface (GUI) program for controlling the system. The system was recently upgraded by introducing an original DAQ module based on a field programmable gate array, FPGA, and also by adding a function for estimating neutron and photon spectra based on an unfolding technique without requiring any specific scientific background of the user. The performance of the upgraded DARWIN was examined in various radiation fields, including an operational field in J-PARC. The experiments revealed that the dose rates and spectra measured by the upgraded DARWIN are quite reasonable, even in radiation fields with peak structures in terms of both spectrum and time variation. These results clearly demonstrate the usefulness of DARWIN for improving radiation safety in high-energy accelerator facilities.

  12. Upgrades to the SPS-to-LHC Transfer Line Beam Stoppers for the LHC High-Luminosity Era

    CERN Document Server

    Kain, Verena; Fraser, Matthew; Goddard, Brennan; Meddahi, Malika; Perillo Marcone, Antonio; Steele, Genevieve; Velotti, Francesco

    2016-01-01

    Each of the 3 km long transfer lines between the SPS and the LHC is equipped with two beam stoppers (TEDs), one at the beginning of the line and one close to the LHC injection point, which need to absorb the full transferred beam. The beam stoppers are used for setting up the SPS extractions and transfer lines with beam without having to inject into the LHC. Energy deposition and thermo-mechanical simulations have, however, shown that the TEDs will not be robust enough to safely absorb the high intensity beams foreseen for the high-luminosity LHC era. This paper will summarize the simulation results and limitations for upgrading the beam stoppers. An outline of the hardware upgrade strategy for the TEDs together with modifications to the SPS extraction interlock system to enforce intensity limitations for beam on the beam stoppers will be given.

  13. Simulations of Inter-Strip Capacitance and Resistance for the Design of the CMS Tracker Upgrade

    CERN Document Server

    Eichhorn, Thomas; Ranjeet, Ranjeet; Eber, Robert; Lalwani, Kavita; Messineo, Alberto; Peltola, Timo Hannu Tapani; Printz, Martin; Ranjan, Kirti

    2014-01-01

    An upgrade of the LHC accelerator, the high luminosity phase of the LHC (HL-LHC), is foreseen for 2023. The tracking system of the CMS experiment at HL-LHC will face a more intense radiation environment than the present system was designed for. This requires an upgrade of the full tracker, which will be equipped with higher granularity as well as radiation harder sensors, which can withstand higher radiation levels and occupancies.\\\\ In order to address the problems caused by the intense radiation environment, extensive measurements and simulation studies have been initiated for investigating these different design and material options for Silicon micro-strip sensors.\\\\ The simulation studies are based on commercial packages (Silvaco and Synopsys TCAD) and aim to investigate sensor characteristics before and after irradiation for fluences up to $1.5 \\cdot 10^{15}\\,\\rm{n_{eq}/cm}^2$. A defect model was developed to implement the radiation damage and tuned to fit experimental measurements.\\\\ This paper cover...

  14. The front-end data conversion and readout electronics for the CMS ECAL upgrade

    Science.gov (United States)

    Mazza, G.; Cometti, S.

    2018-03-01

    The High Luminosity LHC (HL-LHC) will require a significant upgrade of the readout electronics for the CMS Electromagnetic Calorimeter (ECAL). The Very Front-End (VFE) output signal will be sampled at 160 MS/s (i.e. four times the current sampling rate) with a 13 bits resolution. Therefore, a high-speed, high-resolution ADC is required. Moreover, each readout channel will produce 2.08 Gb/s, thus requiring a fast data transmission circuitry. A new readout architecture, based on two 12 bit, 160 MS/s ADCs, lossless data compression algorithms and fast serial links have been developed for the ECAL upgrade. These functions will be integrated in a single ASIC which is currently under design in a commercial CMOS 65 nm technology using radiation damage mitigation techniques.

  15. Upgrading Probability via Fractions of Events

    Directory of Open Access Journals (Sweden)

    Frič Roman

    2016-08-01

    Full Text Available The influence of “Grundbegriffe” by A. N. Kolmogorov (published in 1933 on education in the area of probability and its impact on research in stochastics cannot be overestimated. We would like to point out three aspects of the classical probability theory “calling for” an upgrade: (i classical random events are black-and-white (Boolean; (ii classical random variables do not model quantum phenomena; (iii basic maps (probability measures and observables { dual maps to random variables have very different “mathematical nature”. Accordingly, we propose an upgraded probability theory based on Łukasiewicz operations (multivalued logic on events, elementary category theory, and covering the classical probability theory as a special case. The upgrade can be compared to replacing calculations with integers by calculations with rational (and real numbers. Namely, to avoid the three objections, we embed the classical (Boolean random events (represented by the f0; 1g-valued indicator functions of sets into upgraded random events (represented by measurable {0; 1}-valued functions, the minimal domain of probability containing “fractions” of classical random events, and we upgrade the notions of probability measure and random variable.

  16. Project scenarios for bitumen upgrading

    International Nuclear Information System (INIS)

    Koppel, P.E.; Mazurek, W.L.; Harji, A.

    2002-01-01

    The established reserves of Alberta's heavy oil resources are 178 billion barrels, and potential recoverable reserves are 315 billion barrels. The challenge of production includes the logistics of recovery, upgrading and transportation to market. Utilization of the bitumen is not simple because bitumen is too viscous to transport by pipeline. In addition, it is not processable by most existing refineries unless it can be upgraded through dilution. This paper examined different factors regarding the economic viability of various upgrading methods of a wide range of bitumen feedstocks. The study also examined the sensitivity of refinery demand to the prices of these feedstocks, along with the competitiveness among bitumen-based feedstock and conventional crudes. Western Canada, Ontario and the PADD II district in the United States are the 3 major markets for western Canadian bitumen based feedstock, the demand for which depends on refinery configurations and asphalt demand. This paper described the following 4 generic scenarios that describe Alberta bitumen upgrading projects: (1) adjacent to open pit mines, (2) adjacent to steam assisted gravity drainage (SAGD) facilities, (3) remotely located from resource production at an existing refinery, and (4) pipeline bitumen. It was noted that producers should determine the best way to upgrade the bitumen to ensure there is an economic market for the product, but they should also be aware not to over process the bitumen so as not to leave existing refinery facilities under-utilized. 2 refs., 1 tab., 3 figs

  17. System and process for upgrading hydrocarbons

    Science.gov (United States)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  18. Human-machine interface upgrade

    International Nuclear Information System (INIS)

    Kropik, M.; Matejka, K.; Sklenka, L.; Chab, V.

    2002-01-01

    The article describes a new human-machine interface that was installed at the VR-1 training reactor. The human-machine interface upgrade was completed in the summer 2001. The interface was designed with respect to functional, ergonomic and aesthetic requirements. The interface is based on a personal computer equipped with two displays. One display enables alphanumeric communication between the reactor operator and the nuclear reactor I and C. The second display is a graphical one. It presents the status of the reactor, principal parameters (as power, period), control rods positions, course of the reactor power. Furthermore, it is possible to set parameters, to show the active core configuration, to perform reactivity calculations, etc. The software for the new human-machine interface was produced with the InTouch developing tool of the Wonder-Ware Company. It is possible to switch the language of the interface between Czech and English because of many foreign students and visitors to the reactor. Microcomputer based communication units with proper software were developed to connect the new human-machine interface with the present reactor I and C. The new human-machine interface at the VR-1 training reactor improves the comfort and safety of the reactor utilisation, facilitates experiments and training, and provides better support for foreign visitors. (orig.)

  19. 222-S radioactive liquid waste line replacement and 219-S secondary containment upgrade, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    The U.S. Department of Energy (DOE) is proposing to: (1) replace the 222-S Laboratory (222-S) radioactive liquid waste drain lines to the 219-S Waste Handling Facility (219-S); (2) upgrade 219-S by replacing or upgrading the waste storage tanks and providing secondary containment and seismic restraints to the concrete cells which house the tanks; and (3) replace the transfer lines from 219-S to the 241-SY Tank Farm. This environmental assessment (EA) has been prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of NEPA (40 Code of Federal Regulations [CFR] 1500-1508), and the DOE Implementing Procedures for NEPA (10 CFR 1021). 222-S is used to perform analytical services on radioactive samples in support of the Tank Waste Remediation System and Hanford Site environmental restoration programs. Activities conducted at 222-S include decontamination of analytical processing and support equipment and disposal of nonarchived radioactive samples. These activities generate low-level liquid mixed waste. The liquid mixed waste is drained through pipelines in the 222-S service tunnels and underground concrete encasements, to two of three tanks in 219-S, where it is accumulated. 219-S is a treatment, storage, and/or disposal (TSD) unit, and is therefore required to meet Washington Administrative Code (WAC) 173-303, Dangerous Waste Regulations, and the associated requirements for secondary containment and leak detection. The service tunnels are periodically inspected by workers and decontaminated as necessary to maintain as low as reasonably achievable (ALARA) radiation levels. Although no contamination is reaching the environment from the service tunnels, the risk of worker exposure is present and could increase. 222-S is expected to remain in use for at least the next 30 years to serve the Hanford Site environmental cleanup mission

  20. APS Storage Ring Monopulse RF BPM Upgrade

    Science.gov (United States)

    Lill, R.; Pietryla, A.; Norum, E.; Lenkszus, F.

    2004-11-01

    The Advanced Photon Source (APS) is a third-generation synchrotron light source in its ninth year of operation. The storage ring monopulse radio frequency (rf) beam position monitor (BPM) was designed to measure single-turn and multi-turn beam positions for operations and machine physics studies. Many of the components used in the original design are obsolete and costly to replace. In this paper we present a proposal to upgrade the monopulse rf BPMs in which the existing system hardware is repartitioned and the aging data acquisition system is replaced. By replacing only the data acquisition system, we will demonstrate a cost-effective approach to improved beam stability, reliability, and enhanced postmortem capabilities. An eight-channel ADC/digitizer VXI board with sampling rate of up to 105 MHz (per channel) and 14-bit resolution coupled with a field-programmable gate array and embedded central processing will provide the flexibility to revitalize this system for another decade of operation. We will discuss the upgrade system specifications, design, and prototype test results.

  1. PSI: Upgrading

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade

  2. PSI: Upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1992-09-15

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade.

  3. Upgraded HFIR Fuel Element Welding System

    International Nuclear Information System (INIS)

    Sease, John D.

    2010-01-01

    The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

  4. Development of a high rate TPC. The ALICE TPC upgrade after LS2

    Energy Technology Data Exchange (ETDEWEB)

    Ball, Markus [Rheinische Friedrich-Wilhelms-Universitaet Bonn (Germany); Collaboration: ALICE-Collaboration

    2016-07-01

    The ALICE (A Large Ion Collider Experiment at CERN) collaboration plans an upgrade of the detector system during the second long shutdown of the LHC, during which the interaction rate will be increased to 50 kHz for Pb-Pb collisions. This demands operation of the Time Projection Chamber (TPC) in an ungated continuous mode. A conventional gating grid can not be used to prevent ions drifting back into the drift volume. Micro Pattern Gaseous Detectors (MPGD) such as GEMs and Micromegas offer suppression of the ion backflow. To keep distortions due to space-charge at a tolerable level an ion yield of 10 to 20 back drifting ions per incoming electron is required. However, the need for low ion backflow might be in conflict to other key parameters such as the detector performance and stability of the system. Therefore a careful optimisation of all three requirements was needed. Furthermore the large scale capability of the system has to be guaranteed. Test beams have been carried out to study the large scale performance with an Inner Readout Chamber (IROC) equipped with a multiple GEM system. Also an quadruple GEM Outer Readout Chamber (OROC) was assembled and successfully operated being the largest detector of this type. The upgrade of all readout chambers with a quadruple GEM system has started in 2016. The strategy and the work flow of the TPC upgrade are presented.

  5. Biogas upgrading to biomethane. Proceedings; Biogasaufbereitung zu Biomethan. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-05

    Within the 6th Hanauer Dialogue 'Biogas upgrading to biomethane' at 21st February, 2008, the following lectures were held: (a) Processing of biogas - an introduction (Michael Beil); (b) The climate protecting targets of the Federal Republic of Germany: Which role will play the upgrading of biogas, and which legal boundary conditions are created by the Federal Government? (Uwe Holzhammer); (c) Future strategy: CH{sub 4} grids (Juergen Schmid); (d) Biogas upgrading and biomethane utilization in Sweden (Anneli Petersson); (e) Biogas upgrading and utilization of bio methane in Switzerland (Arthur Wellinger); (f) Biogas upgrading by means of pressure swing adsorption (Alfons Schulte-Schulze Berndt); (g) Biogas upgrading by means of pressurized water washing (Ulf Richter); (h) Biogas upgrading for feeding in public grids. The case of biogas plant Bruck a.d. Leitha (Michael Harasek); (i) Biogas upgrading by means of chemical absorption according to the LP Cooab process (Jerome van Beek); (j) Practical experiences in unpressurized amine washing MT bio methane (Karsten Wuensche); (k) Biogas upgrading by means of organic physical washing with HAASE biogas amplifiers (Roland Kahn); (l) Upgrading using cryogenic technology; the GPP registered -system (Jeroen de Pater); (m) Micro Gas Distribution Systems: Alternatives to biogas upgrading and grid injection (Michael Beil, Bernd Krautkremer); (n) Feeding of exchange gas. The case of project Straelen and Kerpen (Frank Schaefer); (o) Feeding of biogas from the view of grid operators (Norbert Nordmeyer); BIOGASMAX: Biogas as Vehicle Fuel - Market Expansion to 2020 Air Quality (Michael Beil, Uwe Hoffstede); (p) Study: Feeding of biogas into the natural gas distribution system (Fachagentur Nachwachsende Rohstoffe).

  6. Upgrade of the ATLAS Hadronic Tile Calorimeter for the High Luminosity LHC

    CERN Document Server

    Hildebrand, Kevin; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter is the hadronic calorimeter covering the central region of the ATLAS detector at the Large Hadron Collider. It is a scintillator-steel sampling calorimeter read out via wavelength shifting fibers coupled to photomultiplier tubes (PMT). The PMT signals are digitized and stored on detector until a trigger is received. The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade (2024-2025) will accommodate the upgrade of the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. In the new architecture, all signals will be digitized and then transferred directly to the off-detector electronics, where the signals will be reconstructed, stored, and sent to the first level of trigger at the rate of 40 MHz. This will provide better precision of the calorimeter signals...

  7. Upgrade of the ATLAS Hadronic Tile Calorimeter for the High Luminosity LHC

    CERN Document Server

    Hildebrand, Kevin; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter is the hadronic calorimeter covering the central region of the ATLAS detector at the Large Hadron Collider. It is a scintillator-steel sampling calorimeter read out via wavelength shifting fibers coupled to photomultiplier tubes (PMT). . The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade (2024-2025) will accommodate the upgrade of the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. In the new architecture, all signals will be digitized and sent to the first level of trigger at the rate of 40 MHz. This will provide better precision of the calorimeter signals used by the trigger system and will allow the development of more complex trigger algorithms. Changes to the electronics will also contribute to the reliability and redundancy of the system. ...

  8. The D0 detector upgrade

    International Nuclear Information System (INIS)

    Bross, A.D.

    1995-02-01

    The Fermilab collider program is undergoing a major upgrade of both the accelerator complex and the two detectors. Operation of the Tevatron at luminosities upwards of ten time that currently provided will occur in early 1999 after the commissioning of the new Fermilab Main Injector. The D0 upgrade program has been established to deliver a detector that will meet the challenges of this environment. A new magnetic tracker consisting of a superconducting solenoid, a silicon vertex detector, a scintillating fiber central tracker, and a central preshower detector will replace the current central tracking and transition radiation chambers. We present the design and performance capabilities of these new systems and describe results from physics simulations that demonstrate the physics reach of the upgraded detector

  9. Public-Interest Benefit Evaluation of Partial- Upgrading Technology

    Directory of Open Access Journals (Sweden)

    G. Kent Fellows

    2017-01-01

    Full Text Available Approximately 60 per cent of Alberta’s oil sands production is non-upgraded bitumen which, after being mixed with a diluting agent (diluent to allow transport, is exported. A popular view within Alberta — and particularly among Albertan politicians — is that a much larger share of oil sands bitumen should be upgraded in the province. However, without public subsidies or government underwriting, it is uneconomic to build and operate new facilities in Alberta to fully upgrade the bitumen into synthetic crude oil. But there are new partial upgrading technologies being developed that, subject to successful testing at a larger (commercial pilot scale, can prove to be not only economic in Alberta, but also generate large social and economic benefits for the province. The advantages include a much smaller capital investment, a significant increase in the value of the product and market for the product and, even more importantly, a dramatic reduction in the need for large amounts of expensive diluent to transport the product to market. Indeed, the only diluent required will be that to move the bitumen from the production site to the partial upgrader and this can be continually recycled. The market for the synthetic crude oil produced by full upgrading is only getting tougher. Any Alberta bitumen fully upgraded here would compete closely with the rapidly expanding supply of light U.S. unconventional oil. Partial upgrading does not upgrade bitumen to a light crude, but to something resembling more of a medium or heavy crude, and at a lower cost per barrel than full upgrading. Unlike in the increasingly crowded light-crude market, the Alberta Royalty Review Advisory Panel recognized that currently there are gaps in several North American refineries that could be filled by this partially upgraded Alberta oil. A partial upgrader serving that less-competitive market not only appears to hold the potential for investors to make attractive returns in the

  10. Upgrading of PWR plant simulators

    International Nuclear Information System (INIS)

    Wada, Tomonori; Sasaki, Kazunori; Nakaishi, Hirokazu.

    1989-01-01

    For the education and training of operators in electric power plants, simulators have been employed, and it is well known that their effect is great. There are operation training simulators which simulate the dynamic characteristics of plants and all the machinery and equipment that operators handle, and train the procedure of restoration at the time of abnormality in plants, education simulators which can analyze the dynamic characteristics of plants efficiently in a short time, and offer information by visualizing phenomena with three-dimensional display and others so as to be easily understandable, and forecast simulators which do the analysis forecasting plant behavior at the time of abnormality in plants, and investigate the necessity of the guide for operation procedure and the countermeasures at the time of emergency. In this explanation, the upgrading of operation training simulators which have been put already in training is discussed. The constitution of simulator system and the instructor function, the outline of PWR plant simulation models comprising thermal flow model, pump model, leak model and so on, the techniques of increasing simulator speed, and the example of analysis using the NUPAC code are reported. (K.I.)

  11. TCV divertor upgrade for alternative magnetic configurations

    Directory of Open Access Journals (Sweden)

    H. Reimerdes

    2017-08-01

    Full Text Available The Swiss Plasma Center (SPC is planning a divertor upgrade for the TCV tokamak. The upgrade aims at extending the research of conventional and alternative divertor configurations to operational scenarios and divertor regimes of greater relevance for a fusion reactor. The main elements of the upgrade are the installation of an in-vessel structure to form a divertor chamber of variable closure and enhanced diagnostic capabilities, an increase of the pumping capability of the divertor chamber and the addition of new divertor poloidal field coils. The project follows a staged approach and is carried out in parallel with an upgrade of the TCV heating system. First calculations using the EMC3-Eirene code indicate that realistic baffles together with the planned heating upgrade will allow for a significantly higher compression of neutral particles in the divertor, which is a prerequisite to test the power dissipation potential of various divertor configurations.

  12. Advanced new technologies for residue upgrading

    International Nuclear Information System (INIS)

    Gillis, D.

    1997-01-01

    Viewgraphs summarizing UOP technologies for residue are provided. The upgrading technologies include: (1) Aquaconversion, (2) the Discriminatory Destructive Distillation process (3D), and (3) the RCD uniflex process. The Aquaconversion process is based on catalytic hydrovisbreaking. It makes use of a homogeneous (liquid phase) catalyst. The hydrogen is derived from water. The advantages of this process are improved residue stability and quality at higher conversion levels, high synthetic crude yields, low operational complexity, reduced transportation costs. The 3D process is a unique carbon rejection contaminant removal process which can process whole crudes through viscous residues. FCC type equipment is used. Performance characteristics and advantages of the process were highlighted. The RCD uniflex process makes use of proven fixed bed and ebullated bed technologies in a new process configuration in which the fixed bed system is located upstream of the ebullated bed system. In this process, the catalyst volume increases exponentially with increasing processing severity. Performance characteristics, design features, benefits and development progress to date are described. 1 tab., 21 figs

  13. The trend of the research and development for the upgrade of the high current energy system

    International Nuclear Information System (INIS)

    2010-01-01

    The high current energy technology ranges from a basic technology of the electric power field to a state-of-the-art technology and has been used extremely variously. In addition, as the energy technology advances, the expansion of applied field, such as the nuclear fusion and the exhaust thing processing, etc., requires a further upgrade of the large current technology. In this report, the trend of the research and development for the upgrade of the high current energy technology are summarized. In the following, the elemental technology including arc/plasma phenomena and the pulse power system is described in Chapter 2. In Chapter 3, the trend of the research and development for the upgrade of various equipments and devices such as the nuclear fusion development, the superconducting applications of SMES and the maglev transportation system, and the arc application of the exhaust processing for a medical waste, the radio active waste and a detrimental gas and the next generation lithography system. In Chapter 4, the analysis and the measurement technology of the arc phenomenon and the standardization of current shunt, etc are described. We hope this research report can contribute to the promotion of technical exchanges in different fields, and offer guidelines for future development in this high current energy technology. (author)

  14. Initial performance of upgraded Tevatron cryogenic systems

    International Nuclear Information System (INIS)

    Norris, B.L.

    1996-09-01

    Fermilab began operating a re-designed satellite refrigerator systems in November 1993. Upgrades were installed to operate the Tevatron at a magnet temperature of 3.5 K, approximately 1K lower than the original design. Refrigerator upgrades included new valve boxes, larger reciprocating expanders, the installation of cold vapor compressors, new sub-atmospheric instrumentation and an entirely new distributed controls system. Cryogenic system reliability data for Colliding Physics Run 1B is presented emphasizing a failure analysis for each aspect of the upgrade. Comparison to data for Colliding Physics Run 1A (previous to upgrade) is presented to show the impact of a major system overhaul. New operational problems and their solutions are presented in detail

  15. Upgrading nuclear safeguards in Kazakhstan

    International Nuclear Information System (INIS)

    Hunt, Maribeth; Murakami, Kenji

    2005-01-01

    accurately account for the nuclear material received, and to generally upgrade the safety, security, and accountancy standards. While the material that is actually in hold-up may not be of particular concern with respect to nuclear proliferation and nuclear security, a plant's declaration of hold-up may be a way of concealing diversion of nuclear material. Overstating the amount of material in hold-up can allow an operator to divert material. In the past, neither the UMP nor the IAEA has had an accurate estimate of the material designated as hold-up. When the hold-up of a plant can be characterized and verified it assures that this proliferation pathway is protected. During the PIV in September 2004, the Agency used its ISOCS system to re-measure points that had been measured during the PIV in 2003 and to measure points that the operator had measured with the systems provided by the Japanese and the United States. The result was that at the Physical Inventory Taking in 2004, UMP staff were able to make an effective declaration of hold-up and the Agency was able to verify it. At the same time, the rest of the work of the donor States was progressing. The funding from the Japanese government has assured the preparation of three procedures to standardize the nuclear material accountancy and control at the UMP and has sponsored the training of two UMP safeguards officials in Japan. One of the original goals of this integrated project was to significantly reduce, by 2005, the uncertainty in the measurement of hold-up at the UMP. Through the concerted efforts of the IAEA, donor States, and the European Union, this goal was reached in September 2004. Over the next year, work will concentrate on further training of personnel, the Russian translation and distribution of the procedures funded by the Japanese government, coordinating the delivery and installation of equipment from the United States, and UMP staff training in safeguards and safety culture

  16. Analysis of Energy Industry Upgrading in Northeast China

    Science.gov (United States)

    Liu, Xiao-jing; Ji, Yu-liang; Guan, Bai-feng; Jing, Xin

    2018-02-01

    Promoting regional economic growth and realizing the transformation of the mode of economic growth are in industrial upgrading essence The product is a carrier that represents a series of links of production, management and marketing behind the enterprise, and is a comprehensive reflection of the knowledge and ability of a country or region. Based on the industrial spatial structure, this paper visualizes the industrial space in Northeast China from 2005 to 2015, analyzes the comparative advantages of the energy industry in Northeast China, and examines the status quo of the upgrade of the energy industry according to the industrial upgrading status. Based on the industrial spatial structure, Industry intensity in the industrial space, put forward the future direction of the energy industry upgrade and upgrade path.

  17. INCREASING OF ECOLOGICAL EFFICIENCY OF WORN EQUIPMENT BY PARTIAL UPDATES. ANALYTICAL AND CONTROL ASPECT

    Directory of Open Access Journals (Sweden)

    S. Voinova

    2017-12-01

    Full Text Available The current state of worn industrial equipment and the resulting low performance indicators of its functioning, in particular, low environmental friendliness, are considered. It is shown that the normalization of the complex situation that has developed in production is an acute problem, the solution of which should begin with the implementation of a program for the partial renewal of worn equipment. It is pointed out that there is a high potential for improving the technological, including ecological, efficiency of functioning of the upgraded equipment. It is pointed out that the partial renewal is highly efficient, because of the small specific investments in it. The significant influence of the quality of control of the setting and implementation of the renewal program on its effectiveness was noted. It is shown that the process of renewal of worn-out equipment, ultimately, has an environmental focus, increases the environmental friendliness of the updated technical facility.

  18. Micro-NRA and micro-3HIXE with 3He microbeam on samples exposed in ASDEX Upgrade and Pilot-PSI machines

    Science.gov (United States)

    Kelemen, Mitja; Založnik, Anže; Vavpetič, Primož; Pečovnik, Matic; Pelicon, Primož; Hakola, Antti; Lahtinen, Aki; Karhunen, Juuso; Piip, Kaarel; Paris, Peeter; Laan, Matti; Krieger, Karl; Oberkofler, Martin; van der Meiden, Hennie; Markelj, Sabina

    2017-08-01

    Micro nuclear reaction analysis (micro-NRA) exploiting the nuclear reaction D(3He,p)4He was used for post-mortem analyses of special marker samples, exposed to deuterium plasma inside ASDEX Upgrade (AUG) tokamak and to the deuterium plasma jet in the Pilot-PSI linear plasma gun. Lateral concentration profiles of deuterium and erosion/deposition profiles of the marker materials were obtained by a combination of micro-NRA and particle induced X-ray emission by 3He beam (3HIXE). In the case of AUG samples, where 25 nm thick W marker layers had been deposited on unpolished and polished graphite substrates, the effect of surface roughness on local erosion and deposition was also investigated. The lateral distribution of W concentration showed that erosion is much more distinct in the case of polished samples and the resulting surface shows a ;leopard; skin pattern of W accumulated on carbon aggregates left on the surface from polishing. The Pilot-PSI samples indicated preferential accumulation of deuterium a few mm off from the centre of the region affected by the plasma beam. This is connected with the largest surface modifications while the thick deposited layers at the centre do not favour deuterium retention per se. The results were cross correlated with those obtained using laser-induced breakdown spectroscopy (LIBS). With its quantitative abilities, micro-NRA provided essential calibration data for in situ LIBS operation, as well as for complementary post mortem Secondary Ion Mass Spectroscopy (SIMS).

  19. RF upgrade program in LHC injectors and LHC machine

    International Nuclear Information System (INIS)

    Jensen, E.

    2012-01-01

    The main themes of the RF upgrade program are: the Linac4 project, the LLRF-upgrade and the study of a tuning-free wide-band system for PSB, the upgrade of the SPS 800 MHz amplifiers and beam controls and the upgrade of the transverse dampers of the LHC. Whilst LHC Splice Consolidation is certainly the top priority for LS1, some necessary RF consolidation and upgrade is necessary to assure the LHC performance for the next 3- year run period. This includes: 1) necessary maintenance and consolidation work that could not fit the shorter technical stops during the last years, 2) the upgrade of the SPS 200 MHz system from presently 4 to 6 cavities and possibly 3) the replacement of one LHC cavity module. On the longer term, the LHC luminosity upgrade requires crab cavities, for which some preparatory work in SPS Coldex must be scheduled during LS1. (author)

  20. OMEGA upgrade staging options

    International Nuclear Information System (INIS)

    Kelly, J.H.; Shoup, M.J.; Smith, D.L.

    1989-01-01

    The authors discuss how they are designing an upgrade to its 24-beam OMEGA laser system, OMEGA is a frequency tripled, all-rod system capable of producing 2 kJ at 0.8 ns on target. Important direct-drive-target-ignition physics could be investigated with an upgraded system capable of producing a shaped pulse consisting of a long (5ns) low-intensity, foot, smoothly transitioning into a short (0.5 ns), intense, compression pulse. The total pulse energy is 30 kJ, which, from target-irradiation uniformity considerations, must be distributed over 60 beams

  1. Upgrade of the monitoring system of LHCb ECAL

    CERN Document Server

    Guz, Iouri; Chernov, Evgeny; Egorychev, Victor; Kandybei, Sergii; Kvaratskheliya, Tengiz; Obraztsov, Vladimir; Perret, Pascal; Philippov, Sergey; Savrina, Daria; Shatalov, Sppavel; Zakoriuchkina, Tatiana; Zhokhov, Anatoli; Zvyagintsev, Serguei

    2016-01-01

    The LHCb ECAL is a shashlik calorimeter of 6016 cells, covering 7.686.24 m2 area. To monitor the readout chain of each ECAL cell, the LHCb ECAL is equipped with a LED based monitoring system. During the LHC Run I (2009-2012) it was found that the precision of the monitoring suffers from the radiation degradation of transparency of polystyrene clear fibers used to transport the LED light to the ECAL photomultipliers. In order to improve the performance of the monitoring system, and especially in view of significant increase of LHCb working luminosity foreseen after 2018, the present plastic fibers have been replaced by radiation hard quartz fibers. The design of the upgraded version of the LHCb ECAL monitoring system is described here. The usage and performance of the new system for the ECAL calibration during the LHCb Run II are discussed.

  2. Optical telescopes for COMPASS RICH1 up-grade

    CERN Document Server

    Sulc, M; Alekseev, M; Angerer, H; Appolonio, M; Birsa, R; Bordalo, P; Bradamante, F; Bressan, A; Busso, L; Chiosso, V M; Ciliberti, P; Colantoni, M L; Costa, S; Dibiase, N; Dafni, T; Dalla Torre, S; Diaz, V; Duic, V; Delagnes, E; Deschamps, H; Eyrich, W; Faso, D; Ferrero, A; Finger, M; Finger, M Jr; Fischer, H; Gerassimov, S; Giorgi, M; Gobbo, B; Hagemann, R; von Harrach, D; Heinsius, F H; Joosten, R; Ketzer, B; Königsmann, K; Kolosov, V N; Konorov, I; Kramer, D; Kunne, F; Levorato, S; Maggiora, A; Magnon, A; Mann, A; Martin, A; Menon, G; Mutter, A; Nähle, O; Neyret, D; Nerling, F; Pagano, P; Paul, S; Panebianco, S; Panzieri, D; Pesaro, G; Pizzolotto, C; Polak, J; Rebourgeard, P; Rocco, E; Robinet, F; Schiavon, P; Schill, C; Schoenmeier, P; Silva, L; Slunecka, M; Steiger, L; Sozzi, F; Svec, M; Tessarotto, F; Teufel, A; Wollny, H

    2006-01-01

    The central photon detection area of the Ring Imaging Cherenkov detector at COMPASS, a particle physics experiment at CERN SPS dedicated to hadron physics, has been upgraded from the previous system formed by wire chambers with CsI layers to a very fast UV extended multi anode photo multiplier tube array (MAPMT), including 576 tubes. The active area covered by the MAPMTs is 7.3 times smaller than the one previously equipped with CsI photocathodes, so 576 optical concentrators transforming the image from the old system focal plane to the new photocathode plane were needed. The telescope system formed by two fused silica lenses was designed, produced and assembled. The first prismatic plano-convex field lens is placed in the focal plane of the RICH mirrors. The second condenser lens is off centered and tilted and has one aspherical surface. All lenses have antireflection coating.

  3. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Oreglia, M; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The main upgrade will occur for the High Luminosity LHC phase (phase 2) which is scheduled around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to use will be decided after extensive test beam studies. High speed optical links are used to read out all digitized data to the counting room. For the off-detector electronics a new back-end architecture is being developed, including the initial trigger processing and pipeline memories. A demonstrator prototype read-out for a slice of the ...

  4. Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades

    International Nuclear Information System (INIS)

    Edmunds, T.; Saleh, R.; Zevanove, S.

    1992-02-01

    As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility's planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S ampersand S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS

  5. Silicon Sensors for the Upgrades of the CMS Pixel Detector

    CERN Document Server

    Centis Vignali, Matteo; Schleper, Peter

    2015-01-01

    The Compact Muon Solenoid (CMS) is a general purpose detector at the Large Hadron Collider (LHC). The LHC luminosity is constantly increased through upgrades of the accel- erator and its injection chain. Two major upgrades will take place in the next years. The rst upgrade involves the LHC injector chain and allows the collider to achieve a luminosity of about 2 10 34 cm-2 s-1 A further upgrade of the LHC foreseen for 2025 will boost its luminosity to 5 10 34 cm-2 s1. As a consequence of the increased luminosity, the detectors need to be upgraded. In particular, the CMS pixel detector will undergo two upgrades in the next years. The rst upgrade (phase I) consists in the substitution of the current pixel detector in winter 2016/2017. The upgraded pixel detector will implement new readout elec- tronics that allow ecient data taking up to a luminosity of 2 10 34 cm-2s-1,twice as much as the LHC design luminosity. The modules that will constitute the upgraded detector are being produced at dierent institutes. Ham...

  6. Upgrading of Intermediate Bio-Oil Produced by Catalytic Pyrolysis

    Energy Technology Data Exchange (ETDEWEB)

    Abdullah, Zia [Battelle Memorial Inst., Columbus, OH (United States); Chadwell, Brad [Battelle Memorial Inst., Columbus, OH (United States); Taha, Rachid [Battelle Memorial Inst., Columbus, OH (United States); Hindin, Barry [Battelle Memorial Inst., Columbus, OH (United States); Ralston, Kevin [Battelle Memorial Inst., Columbus, OH (United States)

    2015-06-30

    The objectives of this project were to (1) develop a process to upgrade catalytic pyrolysis bio-oil, (2) investigate new upgrading catalysts suited for upgrading catalytic pyrolysis bio-oil, (3) demonstrate upgrading system operation for more than 1,000 hours using a single catalyst charge, and (4) produce a final upgraded product that can be blended to 30 percent by weight with petroleum fuels or that is compatible with existing petroleum refining operations. This project has, to the best of our knowledge, for the first time enabled a commercially viable bio-oil hydrotreatment process to produce renewable blend stock for transportation fuels.

  7. NDT oriented equipment for observing the Doppler broadening of radiation produced by the annihilation of positrons in cylindrical samples

    International Nuclear Information System (INIS)

    Coleman, C.F.; Smith, F.A.; Hughes, A.E.

    1976-11-01

    This report describes the development of equipment for measuring annihilation line broadening in cylindrical samples a few millimetres in diameter, suitable for use in fatigue testing programs. A detached positron source is employed, allowing the samples to be scanned both longitudinally (resolution approximately 1 cm) and in azimuth. Some of the advantages of and problems associated with this configuration are discussed. The statistical precision of a number of parameters

  8. WNP-2 core model upgrade

    International Nuclear Information System (INIS)

    Golightly, C.E.; Ravindranath, T.K.; Belblidia, L.A.; O'Farrell, D.; Andersen, P.S.

    2006-01-01

    The paper describes the core model upgrade of the WNP-2 training simulator and the reasons for the upgrade. The core model as well as the interface with the rest of the simulator are briefly described . The paper also describes the procedure that will be used by WNP-2 to update the simulator core data after future core reloads. Results from the fully integrated simulator are presented. (author)

  9. Seismic evaluation and upgrading design of overhead roads between reactor buildings of WWER-1000 MW type NPP

    International Nuclear Information System (INIS)

    Jordanov, M.J.; Stoyanov, G.S.; Geshanov, I.H.; Kirilov, K.P.; Schuetz, W.

    2003-01-01

    to resist relevant design load combinations, calculation of all important characteristics for the upgraded structure, including derivation of response spectra for specific parts of the structure, where equipment is attached. (author)

  10. Upgrades to the ATLAS trigger system   

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2017-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions wit...

  11. The JLab 12 GeV Energy Upgrade of CEBAF for QCD and Hadronic Physics

    International Nuclear Information System (INIS)

    Lawrence Cardman; Leigh Harwood

    2007-01-01

    CEBAF at Jefferson Lab is a 5-pass, recirculating cw electron linac operating at ∼6 GeV and devoted to basic research in nuclear physics. The 12 GeV Upgrade is a major project, sponsored by the DOE Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. We anticipate that the project will receive Critical Decision 2 approval this year and begin construction in 2008. The research program motivating the Upgrade includes: the study of hybrid mesons, which involve excited states of the glue, to explore the nature of quark confinement; dramatic improvements in our understanding of the QCD structure of the hadrons through the extension of our knowledge of their parton distribution functions to high xBjorken, where they are dominated by underlying valence quark structure, and a program of nucleon ''tomography'' via measurements of the Generalized Parton Distributions (GPDs), a broad program of experiments in the physics of nuclei that aims to understand the QCD basis for the nucleon-nucleon force and how nucleons and mesons arise as an approximation to the underlying quark-gluon structure; and precision tests of the Standard Model through parity violating deep inelastic and Moeller scattering. The Upgrade includes: doubling the accelerating voltages of the linacs by adding 10 new high-performance cryomodules; the requisite expansion of the 2K cryogenics plant and rf power systems to support these cryomodules; upgrading the beam transport system from 6 to 12 GeV through extensive re-use and/or modification of existing hardware; and the addition of one recirculation arc, a new experimental area, and the beamline to it; and the construction of major new experimental equipment for the GPD, high-xBjorken, and hybrid meson programs. The presentation will describe the science briefly and provide some details about the accelerator plans

  12. The D0 upgrade

    International Nuclear Information System (INIS)

    Tuts, P.M.

    1992-10-01

    The original D0 detector was proposed in 1983, with a focus on high P T physics using precision measurements of e's, μ's, jets, and missing E T . This detector, as of the summer of 1992, has started data taking at the Fermilab Collider. However, by 1995/6 the luminosity will reach 10 31 cm -2 sec -1 , and the minimum bunch spacing will drop to 396ns from the present 3.5μs (by the Main Injector era, luminosities will approach 10 32 cm -2 sec -1 and minimum bunch spacings may reach 132ns). These changes in the accelerator conditions force us to upgrade or replace a number of detector subsystems in order to meet these new demands. In addition, the upgrade offers us the opportunity to expand the physics horizons to include not only the all important high P T physics menu, but also the low P T physics that has become increasingly important. In this paper we describe the D0 detector upgrade

  13. LHCb PID Upgrade Technical Design Report

    CERN Document Server

    LHCb Collaboration

    2013-01-01

    The LHCb upgrade will take place in the second long shutdown of the LHC, currently scheduled to begin in 2018. The upgrade will enable the experiment to run at luminosities of $2 \\times 10^{33}cm^{-2}s^{-1}$ and will read out data at a rate of 40MHz into a exible software-based trigger. All sub-detectors of LHCb will be re-designed to comply with these new operating conditions. This Technical Design Report presents the upgrade plans of the Ring Imaging Cherenkov (RICH) system, the calorimeter system and the muon system, which together provide the particle identication capabilities of the experiment.

  14. SVT: an online silicon vertex tracker for the CDF upgrade

    International Nuclear Information System (INIS)

    Bardi, A.; Belforte, S.; Berryhill, J.

    1997-07-01

    The SVT is an online tracker for the CDF upgrade which will reconstruct 2D tracks using information from the Silicon VerteX detector (SVXII) and Central Outer Tracker (COT). The precision measurement of the track impact parameter will then be used to select and record large samples of B hadrons. We discuss the overall architecture, algorithms, and hardware implementation of the system

  15. Instrumentation and control upgrade evaluation methodology: Final report. Volume 2: Workbook

    Energy Technology Data Exchange (ETDEWEB)

    Bliss, M.; Brown, E.; Florio, F.; Stofko, M.

    1996-07-01

    This workbook accompanies the methodology manual (EPRI TR-104963-V1) which describes how to develop an Upgrade Evaluation Report (UER). A UER is an evaluation that is performed by a nuclear power plant to decide the most cost-effective upgrade to perform (if any) for a previously identified Upgrade Candidate System. A UER defines the utility`s mission and objectives in regards to upgrade candidates, as well as the systems initial costs, benefits to each upgrade, and an initial upgrade schedule to cost-effectively implement system upgrades.

  16. Operational experiences and upgradation of waste management facilities Trombay, India

    International Nuclear Information System (INIS)

    Chander, Mahesh; Bodke, S.B.; Bansal, N.K.

    2001-01-01

    Full text: Waste Management Facilities Trombay provide services for the safe management of radioactive wastes generated from the operation of non power sources at Bhabha Atomic Research Centre, India. The paper describes in detail the current operational experience and facility upgradation by way of revamping of existing processes equipment and systems and augmentation of the facility by way of introducing latest processes and technologies to enhance the safety. Radioactive wastes are generated from the operation of research reactors, fuel fabrication, spent fuel reprocessing, research labs. manufacture of sealed sources and labeled compounds. Use of radiation sources in the field of medical, agriculture and industry also leads to generation of assorted solid waste and spent sealed radiation sources which require proper waste management. Waste Management Facilities Trombay comprise of Effluent Treatment Plant (ETP), Decontamination Centre (DC) and Radioactive Solid Waste Management Site (RSMS). Low level radioactive liquid effluents are received at ETP. Plant has 100 M 3 /day treatment capacity. Decontamination of liquid effluents is effected by chemical treatment method using co- precipitation as a process. Plant has 1800 M 3 of storage capacity. Chemical treatment system comprises of clarifloculator, static mixer and chemical feed tanks. Plant has concentrate management facility where chemical sludge is centrifuged to effect volume reduction of more that 15. Thickened sludge is immobilized in cement matrix. Decontamination Centre caters to the need of equipment decontamination from research reactors. Process used is ultrasonic chemical decontamination. Besides this DC provides services for decontamination of protective wears. Radioactive Solid Waste Management Site is responsible for the safe management of solid waste generated at various research reactors, plants, laboratories in Bhabha Atomic Research Centre. Spent sealed radiation sources are also stored

  17. Climate balance of biogas upgrading systems

    International Nuclear Information System (INIS)

    Pertl, A.; Mostbauer, P.; Obersteiner, G.

    2010-01-01

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO 2 .

  18. The spatial structure of type-I ELMs at the mid-plane in ASDEX Upgrade and a comparison with data from MAST

    International Nuclear Information System (INIS)

    Kirk, A; Eich, T; Herrmann, A; Muller, H W; Horton, L D; Counsell, G F; Price, M; Rohde, V; Bobkov, V; Kurzan, B; Neuhauser, J; Wilson, H

    2005-01-01

    The radial extent and spatial structure of type-I edge localized modes (ELMs) in ASDEX Upgrade are investigated using data from a mid-plane manipulator equipped with Langmuir probes and a fast visible imaging camera and are compared to data from MAST. Plasmas with a range of toroidal magnetic fields have been studied. The radial extent of the ELM efflux is found to be largest at the smaller toroidal magnetic field. A study of a series of shots on ASDEX Upgrade with different plasma edge to wall separation suggests that the closeness of the wall does not have a stabilizing effect on the radial extent of the ELM. The data from the mid-plane manipulator and from visible imaging are consistent with non-linear ballooning mode theory, which predicts that the ELM has a filament like structure. On both devices these structures have a poloidal extent of 5-10 cm and a typical toroidal mode number of ∼15 and are found to accelerate away from the plasma edge. The acceleration is ∼3 times larger on MAST than on ASDEX Upgrade

  19. New Physics perspectives with the upgraded LHCb detector

    International Nuclear Information System (INIS)

    Cavallero, G.

    2017-01-01

    First encouraging deviations from Standard Model have been observed by the LHCb Collaboration in the first phase of data taking. The LHCb upgrade will be crucial to conclude if New Physics exists up to ∼ O(100 TeV), thanks to the collection of a very large data sample of ∼ 50 fb"−"1 and to an innovative flexible software based trigger system. An overview of the main observables accessible to LHCb that could reveal New Physics effects is reported.

  20. Personal Dosimetry for Radiation Workers Upgrading an Old Petroleum Oil Field

    International Nuclear Information System (INIS)

    Gomaa, M.A.M.

    2011-01-01

    Radiation protection consultations and services were carried out over the last 15 years in Egypt at several petroleum companies. Egypt issued its first NORM Regulation in 2000; this was subsequently modified in 2006. The main aim of the present work was to report dosimetric experience gained during the handling of contaminated equipment in the upgrading of an old oilfield. Optimization of radiation protection was carried out using lead blankets. Film badges were distributed to workers. Films were redistributed to personnel every few weeks. More than 700 film badges were distributed during the working period and workers' health surveillance was carried out, including complete blood analysis. For the 5 month period, individual doses were estimated. The average effective dose was less than 1 mSv. (author)

  1. Operation status and upgrading of HIRFL

    International Nuclear Information System (INIS)

    Tang, J.Y.; Wang, Y.F.; Wei, B.W.

    2001-01-01

    The operation status and the undergoing upgrading at HIRFL machine are presented. The accelerated ion species with the machine have been expanding, including metallic ions and higher energy with the new ECR ion source. The upgrading of HIRFL as the pre-accelerator of CSR storage ring has been processing steadily. The new 14.5 GHz ECR ion source has been put in operation in early 1999. A full-superconducting ECR ion source of 18 GHz is under design. The manufacture of the new vacuum chamber for SFC is just finished and the installation is to be started. The construction of the new B1 buncher is nearly to be finished, and the off-line test and the installation will be started soon. Another two identical bunchers will be ordered after the test. The beam distribution system is under upgrading to make all experiment stations separate from the others and the time-sharing mode possible, and a new cancer-therapy station is also under construction. The other upgrading items include the yoke enlarging of SFC, beam diagnostics, computer control and beam distribution system

  2. Upgrade of the ATLAS hadronic Tile calorimeter for the High luminosity LHC

    CERN Document Server

    Asensi Tortajada, Ignacio; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS detector at the LHC. It is a sampling calorimeter consisting of alternating thin steel plates and scintillating tiles. Wavelength shifting fibers coupled to the tiles collect the produced light and are read out by photomultiplier tubes. An analog sum of the processed signal of several photomultipliers serves as input to the first level of trigger. Photomultiplier signals are then digitized at 40 MHz and stored on detector and are only transferred off detector once the first level trigger acceptance has been confirmed (at a rate of maximum 100 kHz). The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade, in 2024, will accommodate the upgrade of the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and of...

  3. RESEARCH OF RUSSIAN HIGH TECHNOLOGY MEDICAL EQUIPMENT MARKET: THE SOCIO-ECONOMIC ASPECTS

    Directory of Open Access Journals (Sweden)

    Станислав Сергеевич Отставнов

    2013-04-01

    Full Text Available The article presents the data obtained from comprehensive study of russian hi-tech medical equipment market. The size and the structure of Russian medical equipment market in 2005-2011 were investigated and market size forecast for 2012-2015 was given. Priority segments of Russian high-tech medical equipment market were identified (products with a high degree of visualization, anesthetic and ventilation equipment, patient monitors  based on the analysis of literature sources and morbidity structure. Key players in key segments of the market were identified and their financial performance such as number of employees, revenue, net profit, researches and development expenses were compared (according to actual annual reports.Research allowed to draw the following conclusion: today in the key segments of Russian high-tech medical equipment market the leadership of foreign companies  (Hitachi, Philips, Siemens, Toshiba, General Electric, Dräger is indisputable, objective preconditions for the fundamental change of the situation are absent. Import substitution requires the consolidation of domestic producers, adequate funding and human resource.The results can be used in practice by medical industry companies and State authorities on purpose to upgrade the medical industry.DOI: http://dx.doi.org/10.12731/2218-7405-2013-1-31

  4. Silicon Tracking Upgrade at CDF

    International Nuclear Information System (INIS)

    Kruse, M.C.

    1998-04-01

    The Collider Detector at Fermilab (CDF) is scheduled to begin recording data from Run II of the Fermilab Tevatron in early 2000. The silicon tracking upgrade constitutes both the upgrade to the CDF silicon vertex detector (SVX II) and the new Intermediate Silicon Layers (ISL) located at radii just beyond the SVX II. Here we review the design and prototyping of all aspects of these detectors including mechanical design, data acquisition, and a trigger based on silicon tracking

  5. Events as spaces for upgrading : Automotive events in Shanghai

    NARCIS (Netherlands)

    E. van Tuijl (Erwin); K. Dittrich (Koen)

    2015-01-01

    textabstractThis study contributes to the literature dealing with upgrading of the Chinese automotive industry by analysing the role of events in the upgrading process. By combining literature on temporary clusters with that of knowledge sourcing and upgrading, we investigate how firms use events

  6. Cost evaluation of I and C upgrade approach in nuclear power plants

    International Nuclear Information System (INIS)

    Kang, Hyun-Tae; Lee, Jae-Ki

    2013-01-01

    Highlights: • Cost evaluation process for I and C system upgrade is built. • 4 cost factors affecting I and C system upgrade are described. • Additional cost incurred by a phased upgrade is calculated. • Cost for system upgrade between upgrade implementations is compared. - Abstract: Utilities have recently been debating the respective pros and cons of implementation of a multi-phase upgrade during several normal outages versus a single major upgrade implementation during a prolonged outage. We have studied these approaches and have been developing the basic design of nuclear power plants (NPPs) instrumentation and control (I and C) upgrade since early 2008. As part of this study, analyses of the NPPs I and C systems were conducted and the need for upgrading the systems was raised. One of the primary concerns regarding the system upgrade is a cost-benefit implementation, which will influence the upgrade approach. From this viewpoint, the I and C upgrade must consider economic factors such as I and C vendor cost, architecture engineering cost, installation cost, utility cost, and other transition costs such as training and procedure development. This paper presents a comparison study of economical aspects including cost evaluation between the aforementioned upgrade implementations and suggests a solution for I and C upgrade approach

  7. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade was performed during the Extended Year End Technical Stop of 2016 and 2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics were also upgraded to QIE10-based electronics which implement larger dynamic range and a 6-bit TDC. Following this major upgrade, the Hadron Forward Calorimeters were commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  8. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    Science.gov (United States)

    Bilki, B.; Onel, Y.

    2018-03-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I Upgrade was performed during the Extended Year End Technical Stop of 2016-2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics were also upgraded to QIE10-based electronics which implement larger dynamic range and a 6-bit TDC. Following this major upgrade, the Hadron Forward Calorimeters were commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  9. Bohunice V1 NPP upgrading programme

    International Nuclear Information System (INIS)

    Kerak, J.

    2001-01-01

    The paper describes whole process of Bohunice V1 NPP nuclear safety and operational reliability level increase which has been performed since units commissioning (1. unit in 1978, 2. unit in 1980), continued Small Reconstruction (1991 -1993) and finished Gradual Upgrading(1994 -2000). The main purpose is to last stage -Gradual upgrading of Bohunice V1 NPP. (author)

  10. LEP is upgraded

    CERN Multimedia

    1995-01-01

    A superconducting radio-frequency cavity is installed on the Large Electron-Positron (LEP) collider. This upgrade, known as LEP-2, allowed the accelerator to reach new, higher energies and so investigate new areas of physics.

  11. Studies for the ALICE Inner Tracking System Upgrade

    CERN Document Server

    AUTHOR|(CDS)2079168; Musa, Luciano

    The ALICE experiment at the CERN LHC identifies D0 mesons via secondary-vertex reconstruction and topological cuts to reduce the corresponding combinatorial background in heavy-ion collisions. The D0 meson is produced promptly in initial, hard scatterings via the strong interaction or as feed-down from weakly decaying B hadrons. Within this thesis, a novel method for the separation of prompt and feed-down D0 mesons using cut variations was implemented and applied to data from p–Pb collisions at $\\sqrt(s_\\mathrm{NN})=5.02$ TeV. The effectiveness of the secondary-vertex reconstruction strongly depends on the performance and in particular the pointing resolution of the Inner Tracking System. The upgrade of the ALICE Inner Tracking System for the Long Shutdown 2 of the LHC in 2019/2020 will significantly improve its vertex-reconstruction and tracking capabilities. It will be equipped with Monolithic Active Pixel Sensors manufactured using the TowerJazz 180nm CMOS process on wafers with a high-resistivity epitax...

  12. Preliminary business plan: Plzen district heating system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The district heating system of the City of Plzen, Czech Republic, needs to have physical upgrades to replace aging equipment and to comply with upcoming environmental regulations. Also, its ownership and management are being changed as a result of privatization. As majority owner, the City has the primary goal of ensuring that the heating needs of its customers are met as reliably and cost-effectively as possible. This preliminary business plan is part of the detailed analysis (5 reports in all) done to assist the City in deciding the issues. Preparation included investigation of ownership, management, and technology alternatives; estimation of market value of assets and investment requirements; and forecasting of future cash flow. The district heating system consists of the Central Plzen cogeneration plant, two interconnected heating plants [one supplying both hot water and steam], three satellite heating plants, and cooperative agreements with three industrial facilities generating steam and hot water. Most of the plants are coal-fired, with some peaking units fired by fuel oil.

  13. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  14. Get a winning Oracle upgrade session using the quarterback approach

    Science.gov (United States)

    Anderson, G.

    2002-01-01

    Upgrades, upgrades... too much customer down time. Find out how we shrunk our production upgrade schedule 40% from our estimate of 10 days 12 hours to 6 days 2 hours using the quarterback approach. So your upgrade is not that complex, come anyway. This approach is scalable to any size project and will be extremely valuable.

  15. Slum upgrading in developing countries: lessons from Ghana and ...

    African Journals Online (AJOL)

    The paper identifies common elements in the upgrading programmes in the literature. It assesses two slum upgrading projects from Ghana and Kenya to determine how the elements were factored into the projects' implementation. The article concludes that stakeholders involved in slum upgrading in Africa should consider ...

  16. The LHCb VELO upgrade

    International Nuclear Information System (INIS)

    Rodríguez Pérez, Pablo

    2013-01-01

    LHCb is a forward spectrometer experiment dedicated to the study of new physics in the decays of beauty and charm hadrons produced in proton collisions at the Large Hadron Collider (LHC) at CERN. The VErtex LOcator (VELO) is the microstrip silicon detector surrounding the interaction point, providing tracking and vertexing measurements. The upgrade of the LHCb experiment, planned for 2018, will increase the luminosity up to 2×10 33 cm −2 s −1 and will perform the readout as a trigger-less system with an event rate of 40 MHz. Extremely non-uniform radiation doses will reach up to 5×10 15 1 MeV n eq /cm 2 in the innermost regions of the VELO sensors, and the output data bandwidth will be increased by a factor of 40. An upgraded detector is under development based in a pixel sensor of the Timepix/Medipix family, with 55×55μm 2 pixels. In addition a microstrip solution with finer pitch, higher granularity and thinner than the current detector is being developed in parallel. The current status of the VELO upgrade program will be described together with recent testbeam results

  17. Qinshan 300Mwe NPP full scope simulator upgrade

    International Nuclear Information System (INIS)

    Qi Kelin; Li Qing; Liu Wei, Lai Shengyuan

    2006-01-01

    On April 28,2004, RINPO was awarded the project for Qinshan 300Mwe NPP full scope simulator upgrade, the SAT (site acceptance test) was completed on June 30 2005 and the simulator put into operator training again. Scope of upgrade includes: computer system (DGI server and workstations) all replaced by microcomputers; G2 I/O controllers all replaced by RTP EIOBC; Unix-based simulation support environment replaced by RINPO's PC-based simulation environment RINSIMTM, Instructor software replaced by RINPO's PC-based instructor software with function and diagram redesigned; DEH, Feed-water control and some other digital control systems redeveloped to follow NPP modifications; desk-top simulator with soft panel control room developed as byproduct; most of the models not changed but it is planned the reactor core and PPC model will be upgraded in near future. SAT of upgrade demonstrates that the performance of the simulator much improved after the upgrade. (author)

  18. Coal upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Nunes, S. [IEA Clean Coal Centre, London (United Kingdom)

    2009-10-15

    This report examines current technologies and those likely to be used to produce cleaner coal and coal products, principally for use in power generation and metallurgical applications. Consideration is also given to coal production in the leading coal producing countries, both with developed and developing industries. A range of technologies are considered. These include the coal-based liquid fuel called coal water mixture (CWM) that may compete with diesel, the production of ultra-clean coal (UCC) and coal liquefaction which competes with oil and its products. Technologies for upgrading coal are considered, especially for low rank coals (LRC), since these have the potential to fill the gap generated by the increasing demand for coal that cannot be met by higher quality coals. Potential advantages and downsides of coal upgrading are outlined. Taking into account the environmental benefits of reduced pollution achieved through cleaner coal and reduced transport costs, as well as other positive aspects such as a predictable product leading to better boiler design, the advantages appear to be significant. The drying of low rank coals improves the energy productively released during combustion and may also be used as an adjunct or as part of other coal processing procedures. Coal washing technologies vary in different countries and the implications of this are outlined. Dry separation technologies, such as dry jigging and electrostatic separation, are also described. The demonstration of new technologies is key to their further development and demonstrations of various clean coal technologies are considered. A number of approaches to briquetting and pelletising are available and their use varies from country to country. Finally, developments in upgrading low rank coals are described in the leading coal producing countries. This is an area that is developing rapidly and in which there are significant corporate and state players. 81 refs., 32 figs., 3 tabs.

  19. Effective sample labeling

    International Nuclear Information System (INIS)

    Rieger, J.T.; Bryce, R.W.

    1990-01-01

    Ground-water samples collected for hazardous-waste and radiological monitoring have come under strict regulatory and quality assurance requirements as a result of laws such as the Resource Conservation and Recovery Act. To comply with these laws, the labeling system used to identify environmental samples had to be upgraded to ensure proper handling and to protect collection personnel from exposure to sample contaminants and sample preservatives. The sample label now used as the Pacific Northwest Laboratory is a complete sample document. In the event other paperwork on a labeled sample were lost, the necessary information could be found on the label

  20. Upgrade of of monitoring devices for radiation information

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jung Taek; Park, Won Man; Kim, Jung Soo; Lee, Bong Jae; Jae Yoo Kyung

    1999-01-01

    The Radiation Monitoring System (RMS) in Hanaro of KAERI and NPPs of Korea, supplied by victoreen, sometimes has been stopped to use slow 486 PC (Personal computer) and not to be enough memory in main processing computer, IOCA and IOCB, for signal processing and storing. It is very difficult for operator to operate and maintain RMS, because of using an unfamiliar operating system, SCO Unix, of main computer. And also, ScanRad (TM) program for processing and storing radiation signal has Y2K problems and is able to lose and not to display measuring signals. Therefore it needs to upgrade the computer system in RMS. This study is upgrading the main computer, IOCA, in RMS of Hanaro to Pentium PC, and changing operating System to Window NT-based system. Therefore it needs to upgrade the computer system in RMS. This study is upgrading the main computer, IOCA, in RMS of Hanaro to Pentium PC, and changing Operating System to Window NT-based system. Therefore a performance of the computer system in RMS has been upgraded for operator to be useful. This study is going two steps. First, the main computer, IOCA a part of the whole computer system has been upgraded to Pentium PC, and changed to Window NT-based system. Second, all of the computer system in Hanaro RMS is going to be upgraded. This study has got the following results: a RS-232C serial communication program: between the upgraded IOCA and LCU (Local Control Unit) -- a serial communication test configurating two LCU serial --a parallel communication test configurating two LCU parallel: GUI program to present a radioactive information -- overview schematic display page -- detail display pages -- alarm and event pages -- trend pages and group trend pages.

  1. Upgrade of of monitoring devices for radiation information

    International Nuclear Information System (INIS)

    Kim, Jung Taek; Park, Won Man; Kim, Jung Soo; Lee, Bong Jae; Jae Yoo Kyung

    1999-01-01

    The Radiation Monitoring System (RMS) in Hanaro of KAERI and NPPs of Korea, supplied by victoreen, sometimes has been stopped to use slow 486 PC (Personal computer) and not to be enough memory in main processing computer, IOCA and IOCB, for signal processing and storing. It is very difficult for operator to operate and maintain RMS, because of using an unfamiliar operating system, SCO Unix, of main computer. And also, ScanRad (TM) program for processing and storing radiation signal has Y2K problems and is able to lose and not to display measuring signals. Therefore it needs to upgrade the computer system in RMS. This study is upgrading the main computer, IOCA, in RMS of Hanaro to Pentium PC, and changing operating System to Window NT-based system. Therefore it needs to upgrade the computer system in RMS. This study is upgrading the main computer, IOCA, in RMS of Hanaro to Pentium PC, and changing Operating System to Window NT-based system. Therefore a performance of the computer system in RMS has been upgraded for operator to be useful. This study is going two steps. First, the main computer, IOCA a part of the whole computer system has been upgraded to Pentium PC, and changed to Window NT-based system. Second, all of the computer system in Hanaro RMS is going to be upgraded. This study has got the following results: a RS-232C serial communication program: between the upgraded IOCA and LCU (Local Control Unit) -- a serial communication test configurating two LCU serial --a parallel communication test configurating two LCU parallel: GUI program to present a radioactive information -- overview schematic display page -- detail display pages -- alarm and event pages -- trend pages and group trend pages

  2. The UKIRT Upgrades Programme

    Science.gov (United States)

    Adamson, Andy; Davies, John; Robson, Ian

    Tim Hawarden presented this paper to the 30th anniversary workshop, just a month before his untimely death. The editors have done their best to convert his talk into this paper, and gratefully acknowledge the assistance of Nick Rees (a member of the Upgrades team, now at Diamond Light Source). Tim's discussion concerned the UKIRT Upgrades Project, which ran through the 1990s and transformed the telescope and made it truly competitive on the world stage for operation into the twenty-first century. The reference list at the end of the paper is comprehensive; some of these are referred to in the paper itself and some are included for completeness only.

  3. Reflections on a digital upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tadjalli, M.

    2013-07-01

    Upon receiving US NRC's approval in 2010, the first RPS/ESPS digital upgrade using TELEPERM® XS technology was successfully installed in Spring of 2011 at the first Unit of a three-unit station, followed by the 2nd Unit installation in spring of 2012. Both Units' systems have been operating flawlessly since installation. After about two years of operation, a reflection on digital upgrades and lessons learned, from a vendor perspective, provides valuable insight for the commercial nuclear power industry.

  4. Argonne's atlas control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.; Quock, D.; Chapin, B.; Figueroa, J.

    1999-01-01

    The ATLAS facility (Argonne Tandem-Linac Accelerator System) is located at the Argonne National Laboratory. The facility is a tool used in nuclear and atomic physics research, which focuses primarily on heavy-ion physics. The accelerator as well as its control system are evolutionary in nature, and consequently, continue to advance. In 1998 the most recent project to upgrade the ATLAS control system was completed. This paper briefly reviews the upgrade, and summarizes the configuration and features of the resulting control system

  5. Upgrade of the LHC Injection Kicker Magnets

    CERN Document Server

    Barnes, M J; Baglin, V; Bregliozzi, G; Caspers, F; Calatroni, S; Day, H; Ducimetière, L; Garlaschè, M; Gomes Namora, V; Jimenez, J M; Magnin, N; Mertens, V; Métral, E; Salvant, B; Taborelli, M; Uythoven, J; Weterings, W

    2013-01-01

    Two LHC injection kicker systems, each comprising 4 magnets per ring, produce a kick of 1.3 T·m with a rise-time of less than 900 ns and a flattop ripple of less than ±0.5%. A beam screen is placed in the aperture of each magnet, to provide a path for the image current of the LHC beam and screen the ferrite yoke against wake fields. The screen consists of a ceramic tube with conductors in the inner wall. The initially implemented beam screen ensured a low rate of electrical breakdowns and an adequately low beam coupling impedance. Operation with increasingly higher intensity beams, stable for many hours at a time, has resulted in substantial heating of the ferrite yoke, sometimes requiring cool-down over several hours before the LHC can be refilled. During the long shutdown in 2013/2014 all eight kicker magnets will be upgraded with an improved beam screen and an increased emissivity of the vacuum tank. In addition equipment adjacent to the injection kickers and various vacuum components will be modified to...

  6. Completion of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F. H.

    1998-01-01

    In the fall of 1992 at the SNEAP(Symposium of North Eastern Accelerator Personnel) a project to up grade the ATLAS (Argonne Tandem Linear Accelerator System) control system was first reported. Not unlike the accelerator it services the control system will continue to evolve. However, the first of this year has marked the completion of this most recent upgrade project. Since the control system upgrade took place during a period when ATLAS was operating at a record number of hours, special techniques were necessary to enable the development of the new control system ''on line'' while still saving the needs of normal operations. This paper reviews the techniques used for upgrading the ATLAS control system while the system was in use. In addition a summary of the upgrade project and final configuration, as well as some of the features of the new control system is provided

  7. Is your upgrade worth it? process mining can tell

    NARCIS (Netherlands)

    Genuchten, van M.J.I.M.; Mans, R.S.; Reijers, H.A.; Wismeijer, D.

    2014-01-01

    Software vendors typically release updates and upgrades of their software once or twice a year. Users are then faced with the question of whether the upgrade is worth the price and the trouble. The software industry doesn't provide much evidence that it's worthwhile to upgrade to new releases. The

  8. Is your upgrade worth it? Process mining can tell

    NARCIS (Netherlands)

    Genuchten, M.J.I.M.; Mans, R.S.; Reijers, H.A.; Wismeijer, D.

    2014-01-01

    Software vendors typically release updates and upgrades of their software once or twice a year. Users are then faced with the question of whether the upgrade is worth the price and the trouble. The software industry doesn't provide much evidence that it's worthwhile to upgrade to new releases. The

  9. Photoelectric equipment type MFS-7 for analyzing oils

    International Nuclear Information System (INIS)

    Orlova, S.A.; Fridman, M.G.; Kholosha, T.V.; Ezhoda, G.D.; Nechitailov, V.V.

    1987-01-01

    The authors describe the equipment type MFS-7 which is intended for analyzing used oils for the wear products of motors. The difference between type MFS-7 and its predecessors lies in the application of computer techniques to control the equipment and process the output data; and in the design of the sample container, which allows for two methods of introducing the sample into the discharge. The photoelectric equipment consists of an excitation spectrum source IVS-28, having an ac arc mode and 1.v. spark, a polychoromator, a special sample holder for analyzing liquid samples, an electronic recording apparatus with digital voltmeter type ERU-18 and control computer system Spectr 2.2 based on a minicomputer with its own printer. The type MFS-7 equipment has been tested and put into mass production

  10. Environmental upgrading of a landfill

    International Nuclear Information System (INIS)

    Agostinetto, V.; Vendrame, G.

    1999-01-01

    This article refers to an experimental study concerning the vegetative upgrading of a closed-down landfill (once used for industrial waste disposal). The aim was to check the possibility of reconstructing or aiding the natural growth of a vegetation in keeping with the surrounding area, in a tried environment such as that of landfills. The original idea contained in the approved project - which meant to generically upgrade the territory by planting species belonging to the grassy layer, shrubs and trees - has, with time, undergone some changes. On the basis of both the knowledge acquired during management and of a more accurate analysis of the territory, the experiment was preferred to aim at finding out which were the species, both continental and Mediterranean, able to gradually adjust to the surrounding landscape, leaving to natural selection the task to decide which species were more suitable to the upgrading of closed-down landfills, and which planting technique was more effective [it

  11. Scenarios for the LHC Upgrade

    CERN Document Server

    Scandale, Walter

    2008-01-01

    The projected lifetime of the LHC low-beta quadrupoles, the evolution of the statistical error halving time, and the physics potential all call for an LHC luminosity upgrade by the middle of the coming decade. In the framework of the CARE-HHH network three principal scenarios have been developed for increasing the LHC peak luminosity by more than a factor of 10, to values above 1035 cm−2s−1. All scenarios imply a rebuilding of the high-luminosity interaction regions (IRs) in combination with a consistent change of beam parameters. However, their respective features, bunch structures, IR layouts, merits and challenges, and luminosity variation with β∗ differ substantially. In all scenarios luminosity leveling during a store would be advantageous for the physics experiments. An injector upgrade must complement the upgrade measures in the LHC proper in order to provide the beam intensity and brightness needed as well as to reduce the LHC turnaround time for higher integrated luminosity.

  12. Hydrogen assisted biological biogas upgrading

    DEFF Research Database (Denmark)

    Bassani, Ilaria

    Wind and biomass are promoted worldwide as sustainable forms of energy. Anaerobic digestion of biomass produces biogas with ∼50−70% CH4 and 30−50% CO2. However, biogas with >90% CH4 content has higher heating value, can be injected into the natural gas grid or used as alternative to natural gas...... as vehicle fuel. Methods currently available for biogas upgrading mainly consists of physicochemical CO2 removal, requiring the use of chemical substances and energy input and, thus, increasing process costs. This PhD project proposes an alternative to existing biogas upgrading technologies, where H2......, produced by water electrolysis, using excess of electricity from wind mills, is coupled with the CO2 contained in the biogas to convert them to CH4. This process is defined as biological biogas upgrading and is carried out by hydrogenotrophic methanogenic archaea that couples CO2 with H2 to produce...

  13. The Upgrade to Hybrid Incubators in China

    DEFF Research Database (Denmark)

    Hu, Yimei; Gao, Yuchen

    countries and emerging economics. Based on a single in-depth case-study of Tuspark Incubator, this study explores key factors and specific ways for the upgrade to hybrid incubators in the context of China. By using categorical analysis, three factors, i.e. incubation subdivision, intermediary platform......, and proactive approach, are found to be essential for a formerly government-sponsored TBI’s upgrading. The result of this study also provides new insights and several implications for incubator managers and policy makers in emerging economies. In addition, whether the key factors can be used in upgrade of other...... TBIs in China requires further study....

  14. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade is being performed during the Extended Year End Technical Stop of 2016 â?? 2017. In the framework of the upgrade, the PMT boxes are being reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics is also being upgraded to QIE10-based electronics which will implement larger dynamic range and a 6-bit TDC to eliminate the background to have an effect on the trigger. Following this major upgrade, the Hadron Forward Calorimeters will be commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  15. Upgrading of radon's type near surface repository in Latvia

    International Nuclear Information System (INIS)

    Abramenkovs, A.

    2006-01-01

    In 1959, the Soviet government decided to construct the near surface radioactive wastes repository 'Radons' near the Baldone city. It was put in operation in 1962. The changes in the development of the repository were induced by the necessarily to upgrade it for disposal of radioactive wastes from the decommissioning of the Salaspils Research Reactor (SRR). The safety assessment of repository was performed during 2000-2001 under the PHARE project for necessary upgrades of repository. The outline design for new vaults and interim storage for long lived radioactive wastes was elaborated during 2003-2004 years. The Environmental Impact Assessment (EIA) for upgrade of Baldone repository was performed during 2004-2005 years. It was found, that additional efforts must be devoted for solution of social aspects o for successful operation and upgrade of repository. It was shown by EIA, that the local population has a negative opinion against the upgrade of repository in Latvia. The main recommendations for upgrades were connected with increasing the safety of repository, increasing of PR activities for education of society and developing of compensation mechanism for local municipality. (author)

  16. Upgrading of data acquisition software for centralized radiation monitoring system in Malaysian Nuclear Agency

    Energy Technology Data Exchange (ETDEWEB)

    Yussup, F., E-mail: nolida@nm.gov.my; Ibrahim, M. M., E-mail: maslina-i@nm.gov.my; Soh, S. C.; Hasim, H. [Instrumentation and Automation Centre, Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Haris, M. F. [Information Technology Centre, Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Azman, A. [Prototype and Development Centre, Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Razalim, F. A. A.; Yapp, R. [Health Physics Group, Radiation Safety and Health Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Ramli, A. A. M. [Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia)

    2016-01-22

    With the growth of technology, many devices and equipments can be connected to the network and internet to enable online data acquisition for real-time data monitoring and control from monitoring devices located at remote sites. Centralized radiation monitoring system (CRMS) is a system that enables area radiation level at various locations in Malaysian Nuclear Agency (Nuklear Malaysia) to be monitored centrally by using a web browser. The Local Area Network (LAN) in Nuclear Malaysia is utilized in CRMS as a communication media for data acquisition of the area radiation levels from radiation detectors. The development of the system involves device configuration, wiring, network and hardware installation, software and web development. This paper describes the software upgrading on the system server that is responsible to acquire and record the area radiation readings from the detectors. The recorded readings are called in a web programming to be displayed on a website. Besides the main feature which is acquiring the area radiation levels in Nuclear Malaysia centrally, the upgrading involves new features such as uniform time interval for data recording and exporting, warning system and dose triggering.

  17. Upgrading of data acquisition software for centralized radiation monitoring system in Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Yussup, F.; Ibrahim, M. M.; Soh, S. C.; Hasim, H.; Haris, M. F.; Azman, A.; Razalim, F. A. A.; Yapp, R.; Ramli, A. A. M.

    2016-01-01

    With the growth of technology, many devices and equipments can be connected to the network and internet to enable online data acquisition for real-time data monitoring and control from monitoring devices located at remote sites. Centralized radiation monitoring system (CRMS) is a system that enables area radiation level at various locations in Malaysian Nuclear Agency (Nuklear Malaysia) to be monitored centrally by using a web browser. The Local Area Network (LAN) in Nuclear Malaysia is utilized in CRMS as a communication media for data acquisition of the area radiation levels from radiation detectors. The development of the system involves device configuration, wiring, network and hardware installation, software and web development. This paper describes the software upgrading on the system server that is responsible to acquire and record the area radiation readings from the detectors. The recorded readings are called in a web programming to be displayed on a website. Besides the main feature which is acquiring the area radiation levels in Nuclear Malaysia centrally, the upgrading involves new features such as uniform time interval for data recording and exporting, warning system and dose triggering

  18. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    CERN Document Server

    Rossel, R E; Richter, D; Wendt, K D A; Rothe, S; Marsh, B A

    2013-01-01

    With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The syst...

  19. Optimization bitumen-based upgrading and refining schemes

    Energy Technology Data Exchange (ETDEWEB)

    Munteanu, M.; Chen, J. [National Centre for Upgrading Technology, Devon, AB (Canada); Natural Resources Canada, Devon, AB (Canada). CanmetENERGY

    2009-07-01

    This poster highlighted the results of a study in which the entire refining scheme for Canadian bitumen as feedstocks was modelled and simulated under different process configurations, operating conditions and product structures. The aim of the study was to optimize the economic benefits, product quality and energy use under a range of operational scenarios. Optimal refining schemes were proposed along with process conditions for existing refinery configurations and objectives. The goal was to provide guidelines and information for upgrading and refining process design and retrofitting. Critical steps were identified with regards to the upgrading process. It was concluded that the information obtained from this study would lead to significant improvement in process performance and operations, and in reducing the capital cost for building new upgraders and refineries. The simulation results provided valuable information for increasing the marketability of bitumen, reducing greenhouse gas emissions and other environmental impacts associated with bitumen upgrading and refining. tabs., figs.

  20. Instrument hardware and software upgrades at IPNS

    International Nuclear Information System (INIS)

    Worlton, Thomas; Hammonds, John; Mikkelson, D.; Mikkelson, Ruth; Porter, Rodney; Tao, Julian; Chatterjee, Alok

    2006-01-01

    IPNS is in the process of upgrading their time-of-flight neutron scattering instruments with improved hardware and software. The hardware upgrades include replacing old VAX Qbus and Multibus-based data acquisition systems with new systems based on VXI and VME. Hardware upgrades also include expanded detector banks and new detector electronics. Old VAX Fortran-based data acquisition and analysis software is being replaced with new software as part of the ISAW project. ISAW is written in Java for ease of development and portability, and is now used routinely for data visualization, reduction, and analysis on all upgraded instruments. ISAW provides the ability to process and visualize the data from thousands of detector pixels, each having thousands of time channels. These operations can be done interactively through a familiar graphical user interface or automatically through simple scripts. Scripts and operators provided by end users are automatically included in the ISAW menu structure, along with those distributed with ISAW, when the application is started

  1. Replacement strategy for ASDEX upgrade's new control and data acquisition

    International Nuclear Information System (INIS)

    Raupp, G.; Behler, K.; Cole, R.; Engelhardt, K.; Lohs, A.; Lueddecke, K.; Neu, G.; Treutterer, W.; Vijverberg, Th.; Zasche, D.; Zehetbauer, Th.

    2004-01-01

    ASDEX Upgrade is being equipped with a new real-time plasma control and data acquisition system and a novel time system. Major components were implemented and installed. While much work for performance optimisation and application programming remains to be done, commissioning of the new system parallel to experiment operation is being prepared. Commissioning of the new system will be done step-by-step. To facilitate testing the old and new control systems share all input signals. Switching between old and new system can be performed within 60 min: 23 fibre optics for output of actuator commands and input triggers must be connected to the active system and minor modifications done to interface the machine protection. Commissioning phases include background listening, technical discharges and full plasma operation. With the strategy chosen we minimize risk to the machine and reduce interference with ongoing experiment campaigns

  2. NASA Glenn's Single-Stage Axial Compressor Facility Upgraded

    Science.gov (United States)

    Brokopp, Richard A.

    2004-01-01

    NASA Glenn Research Center's Single-Stage Axial Compressor Facility was upgraded in fiscal year 2003 to expand and improve its research capabilities for testing high-speed fans and compressors. The old 3000-hp drive motor and gearbox were removed and replaced with a refurbished 7000-hp drive motor and gearbox, with a maximum output speed of 21,240 rpm. The higher horsepower rating permits testing of fans and compressors with higher pressure ratio or higher flow. A new inline torquemeter was installed to provide an alternate measurement of fan and compressor efficiency, along with the standard pressure and temperature measurements. A refurbished compressor bearing housing was also installed with bidirectional rotation capability, so that a variety of existing hardware could be tested. Four new lubrication modules with backup capability were installed for the motor, gearbox, torquemeter, and compressor bearing housing, so that in case the primary pump fails, the backup will prevent damage to the rotating hardware. The combustion air supply line for the facility inlet air system was activated to provide dry air for repeatable inlet conditions. New flow conditioning hardware was installed in the facility inlet plenum tank, which greatly reduced the inlet turbulence. The new inlet can also be easily modified to accommodate 20- or 22-in.-diameter fans and compressors, so a variety of existing hardware from other facilities (such as Glenn's 9- by 15-Foot Low-Speed Wind Tunnel) can be tested in the Single-Stage Axial Compressor Facility. An exhaust line was also installed to provide bleed capability to remove the inlet boundary layer. To improve the operation and control of the facility, a new programmable logic controller (PLC) was installed to upgrade from hardwired relay logic to software logic. The PLC also enabled the usage of human-machine interface software to allow for easier operation of the facility and easier reconfiguration of the facility controls when

  3. Vibration aging of diesel-engine mounted electrical equipment

    International Nuclear Information System (INIS)

    Lee, B.J.; Morton, W.C.

    1994-01-01

    The Emergency Diesel Generator (EDG) in a Nuclear Power Plant is considered to be a component which is essential to safe plant operation. Failures of auxiliary equipment directly mounted on the EDG creates costly repairs, and compromises the engine's availability and reliability. Although IEEE-323 requires addressing of safety-related components due to mechanically induced vibration, very few guidelines exist in the nuclear industry to show how this may be accounted for. Most engine vendors rely on the empirical experience data as the basis of their evaluation for vibration. Upgrade of engine controls, addition of monitoring devices and other engine modifications require design and installation of new equipment to be mounted directly on the engine. This necessitates the evaluation for engine-induced vibration which is considered to be one of the most severe design parameters. This paper discusses the engine vibration characteristics, and the acquisition of extensive field vibration data on the diesel engine under operating conditions. The data is then used to develop life cycle vibration qualification test profiles that can be applied with confidence in a laboratory environment to qualify engine-mounted equipment. The intent is to validate a product's ability to survive under worst case, extended service on-engine conditions. This paper describes the procedures and approaches used to achieve those goals, and provides developed profile examples and test results

  4. A summary of the regional upgrader business plan

    International Nuclear Information System (INIS)

    Carpenter, J.S.

    1991-01-01

    The stakeholders with potential interests in an Alberta regional upgrader for bitumen, heavy oil, or refinery residue were identified and a reasonably comprehensive business plan for such an upgrader was created and analyzed. Assuming a plant accepting 30,000 bbl/d of feedstock using known hydrocracking and hydroprocessing technologies, producing a synthetic crude oil of a quality good enough to substitute for Alberta light crude in existing refineries, the risks, financing arrangements, and base case economics were examined. According to reasonable price forecasts and a socio-economic benefit assessment, there are enough benefits in such an upgrader to make its construction attractive in the near term. However, conventional investment economics make it unlikely that such a project could be supported in Alberta's current business environment. Accordingly, the business plan was revised to reduce risks and increase profitability to equity holders. The plant capacity would be doubled, with a major oil company acquiring half the output for its own production at less than half the installed cost. The rest of the plant would be owned by government and by smaller producers who would gain access to the upgrader feedstock capacity. A collar mechanism is offered to reduce bitumen price risks without impairing upgrader economics. A number of niche opportunities are also identified within the regional upgrader concept that would further enhance the return through lower costs. 2 figs., 4 tabs

  5. Use of ultrasound in petroleum residue upgradation

    Energy Technology Data Exchange (ETDEWEB)

    Sawarkar, A.N.; Pandit, A.B.; Samant, S.D.; Joshi, J.B. [Mumbai Univ., Mumbai (India). Inst. of Chemical Technology

    2009-06-15

    The importance of bottom-of-the barrel upgrading has increased in the current petroleum refining scenario because of the progressively heavier nature of crude oil. Heavy residues contain large concentrations of metals such as vanadium and nickel which foul catalysts and reduce the potential effect of residue fluidized catalytic cracking. This study showed that the cavitational energy induced by ultrasound be be successfully used to upgrade hydrocarbon mixtures. Conventional processes for the upgrading of residual feedstocks, such as thermal cracking and catalytic cracking, were carried out in the temperature range of 400-520 degrees C. Experiments were performed on 2 vacuum residues, Arabian mix vacuum residue (AMVR) and Bombay high vacuum residue (BHVR) and 1 Haldia asphalt (HA). These were subjected to acoustic cavitation for different reaction times from 15 to 120 minutes at ambient temperature and pressure. Two acoustic cavitation devices were compared, namely the ultrasonic bath and ultrasonic horn. In particular, this study compared the ability of these 2 devices to upgrade the petroleum residues to lighter, more value-added products. Different surfactants were used to examine the effect of ultrasound on upgrading the residue when emulsified in water. In order to better understand the reaction mechanism, a kinetic model was developed based on the constituents of the residue. The ultrasonic horn was found to be more effective in bringing about the upgrading than ultrasonic bath. The study also showed that the acoustic cavitation of the aqueous emulsified hydrocarbon mixture could reduce the asphaltenes content to a greater extent than the acoustic cavitation of non-emulsified hydrocarbon mixture. 20 refs., 11 tabs., 17 figs.

  6. Fitting partially upgraded oils into pipelines and refinery markets

    International Nuclear Information System (INIS)

    Flaherty, G.

    2000-01-01

    The logistics of transporting partially upgraded crudes in feeder and trunk pipeline systems is discussed. Logistic alternatives are evaluated against economic drivers for partial upgrading, and the impact of crude transportation logistics on the quality of crude that reaches refinery gates is assessed. The potential advantages of partial upgrading in the field are reviewed (including reduction of diluent required to meet pipeline density and viscosity specifications, cost and availability of diluent, limitations in diluent transportation infrastructure, increased chemical stability, increased attractiveness to refineries, shortage of refinery coking capacity, higher market value). The pros and cons of various upgrading processes, and the implications of each for producers and refiners are explained. The advantages of moving to large common streams, as opposed to the concept of 'boutique' crudes, are stressed as the surest way for producers to realize the maximum value of partially upgraded crudes

  7. Environmental assessment for the electric utility system distribution, replacements and upgrades at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    1992-04-01

    This Environmental Assessment evaluates the environmental effects resulting from the distribution of new electrical service, replacement of inadequate or aging equipment, and upgrade of the existing electrical utility system at Lawrence Livermore National Laboratory. The projects assessed herein do not impact cultural or historic resources, sensitive habitats or wetlands and are not a source of air emissions. The potential environmental effects that do result from the action are fugitive dust and noise from construction and the disposal of potentially contaminated soil removed from certain limited areas of the LLNL site as a result of trenching for underground transmission lines. The actions described in this assessment represent an improved safety and reliability to the existing utility system. Inherent in the increased reliability and upgrades is a net increase in electrical capacity, with future expansion reserve. As with any electrical device, the electrical utility system has associated electric and magnetic fields that present a potential source of personnel exposure. The potential is not increased, however, beyond that which already exists for the present electrical utility system

  8. Thyristor crowbar system for the high current power supplies of ASDEX upgrade

    International Nuclear Information System (INIS)

    Kaesemann, C.-P.; Lieshout, L. van; Huart, M.; Sihler, C.

    2005-01-01

    The ohmic heating system and the poloidal field coils of ASDEX upgrade are supplied by 15 thyristor converter units with an installed apparent power of 600 MVA. To protect the thyristor converters against dc overvoltage arising from abnormal operations and resulting damages caused by the large energy stored in the AUG magnet coils an overvoltage protection system was required. The paper describes the motivation for-and the design and testing of the thyristor crowbar system representing the thyristor converter overvoltage protection system. It will present the layout, analyse the results of measurements obtained during commissioning, compare them to the calculated (design) values and report on the first experience of operation on the AUG coils improving the safety of the equipment

  9. Energy upgrading measures improve also indoor climate

    DEFF Research Database (Denmark)

    Foldbjerg, Peter; Knudsen, Henrik Nellemose

    2014-01-01

    A new survey shows that the economy is what motivates Danish owners of single-family houses the most to start energy upgrading, and that improved indoor climate is also an important factor. After the upgrading, homeowners experience both improved economy and indoor climate. In a strategy...... to increase the number of homeowners who venture into a major energy upgrading of their house, the demonstrated positive side effects, more than energy savings, should be included in the communication to motivate homeowners. The barriers should be reduced by “taking the homeowners by the hand” and helping...... them to choose relevant energy-saving solutions as well as clarifying the financial consequences and opportunities....

  10. The CMS Tracker Upgrade for HL-LHC\\\\ Sensor R$\\&$D

    CERN Document Server

    Naseri, Mohsen

    2014-01-01

    At an instantaneous luminosity of 5~$\\times10^{34}~cm^{-2}~s^{-1}$, the high-luminosity phase of the Large Hadron Collider (HL-LHC) is expected to deliver a total of 3000~fb$^{-1}$ of collisions, hereby increasing the discovery potential of the LHC experiments significantly. However, the radiation environment of the tracking system will be severe, requiring new radiation hard sensors for the CMS tracker. Focusing on the upgrade of the outer tracker region, the CMS tracker collaboration has almost completed a large material investigation and irradiation campaign to identify the silicon material and design that fulfils all requirements of a new tracking detector at HL-LHC. Focusing on the upgrade of the outer tracker region, pad diodes as well as fully functional strip sensors have been implemented on silicon wafers with different material properties and thicknesses. The samples were irradiated with a mixture of neutrons and protons corresponding to fluences as expected for various positions in the future track...

  11. Advantages of customer/supplier involvement in the upgrade of River Bend's IST program

    International Nuclear Information System (INIS)

    Womack, R.L.; Addison, J.A.

    1996-01-01

    At River Bend Station, IST testing had problems. Operations could not perform the test with the required repeatability; engineering could not reliably trend test data to detect degradation; licensing was heavily burdened with regulatory concerns; and maintenance could not do preventative maintenance because of poor prediction of system health status. Using Energy's Total Quality principles, it was determined that the causes were: lack of ownership, inadequate test equipment usage, lack of adequate procedures, and lack of program maintenance. After identifying the customers and suppliers of the IST program data, Energy management put together an upgrade team to address these concerns. These customers and suppliers made up the IST upgrade team. The team's mission was to supply River Bend with a reliable, functional, industry correct and user friendly IST program. The IST program in place went through a verification process that identified and corrected over 400 individual program discrepancies. Over 200 components were identified for improved testing methods. An IST basis document was developed. The operations department was trained on ASME Section XI testing. All IST tests have been simplified and shortened, due to heavy involvement by operations in the procedure development process. This significantly reduced testing time, resulting in lower cost, less dose and greater system availability

  12. Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility

    Science.gov (United States)

    Webb, Andrew

    2000-01-01

    The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

  13. Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility

    Science.gov (United States)

    Webb, Andrew T.; Powers, Edward I. (Technical Monitor)

    2000-01-01

    The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

  14. Assessment of technical equipment supply in healthcare institutions: example of Almaty

    Directory of Open Access Journals (Sweden)

    Kuralbai K Kurakbayev

    2014-01-01

    Full Text Available Background: The share of healthcare-related expenditure in the Gross Domestic Product of Kazakhstan is relatively small, and it is strategically important to restructure budgetary expenses in favor of healthcare with simultaneous redistribution of resources in accordance with changing demands and prioritization of high-quality medical care. The aim of this study was to analyze resource provision to healthcare organizations in Kazakhstan and its structure and level assessment. Materials and Methods: The study is based on a comparative assessment of technical and technological equipment of medical institutions in Almaty, Kazakhstan. We analyzed the scope and structure of the financial component of the resource base in Almaty. We carried out information processing and analysis methods, content analysis, mathematical treatment, as well as conducted case studies. Also, we held opinion poll among medical staff (specialists, managerial staff (n = 300 P for trend < 0.001 and patients (n = 210 P for trend < 0.001. Results: About 18.8% of patients do not receive medical care because of defects of the equipment, whereas 19.9% of patients claim that the reason of refusal of the provision of medical services is an equipment overload. Conclusion: Most of the respondents referred to on poor technical equipment, mismatch with the world standards of performance and competitiveness. Lack of advanced medical technology, inadequate financing, insufficient supply of domestic medical equipment, and inadequate procurement by tender were also noted. The obtained data point to the need for optimization and upgrading medical equipment at various levels of healthcare.

  15. Original seismic and similar severe external loading design basis for WWER type nuclear power plants in Czech and Slovak Republics and actual issues of their upgrading

    International Nuclear Information System (INIS)

    Masopust, R.

    1993-01-01

    The WWER type NPPs located in Czech and Slovak republics have many seismic vulnerabilities similar to those recognized in many of the US NPPs prior to late seventies. They are mostly caused by underestimation of these problems in the design phases, sometimes due to inadequate performance and poor quality of works and some incompatibilities between the original Russian design and current international design bases and safety requirements. It is believed that the structures and equipment of these NPPs can be seismically upgraded at a moderate cost. It is also believed that the IAEA Benchmark study for seismic analysis and testing of WWER NPPs will develop recommendations to effective seismic upgrading of the existing plants

  16. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  17. Advantages of viscodampers for NPPs upgrading

    International Nuclear Information System (INIS)

    Reinsch, K.H.; Schwahn, K.J.; Podrouzek, J.

    1993-01-01

    Viscodampers GERB are the ideal components for seismic upgrading of flexible pipework systems of the existing operating NPPs, of WWER-440 type, namely in primary reactor part. There are cheap, maintenance-free, simple and their installation minimizes the support forces to the structures. The quoted attests are enclosed in this paper. The references for application on Bohunice NPP upgrading are positive, and they are used in Mochovce and Temelin NPP as well

  18. Academic Training - LHC luminosity upgrade: detector challenges

    CERN Multimedia

    Françoise Benz

    2006-01-01

    ACADEMIC TRAINING LECTURE SERIES 13, 14, 15, March, from 11:00 to 12:00 - 16 March from 10:00 to 12:00 Main Auditorium, bldg. 500 on 14, 15 March, Council Room on 13, 16 March LHC luminosity upgrade: detector challenges A. De Roeck / CERN-PH, D. Bortoletto / Purdue Univ. USA, R. Wigmans / Texas, Tech Univ. USA, W. Riegler / CERN-PH, W. Smith / Wisconsin Univ. USA The upgrade of the LHC machine towards higher luminosity (1035 cm-2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector ...

  19. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5x compared to the design luminosity (10^34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade is expected to happen around 2023. The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 ...

  20. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Lingemann, Joschka; Sakulin, Hannes; Jeitler, Manfred; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run 2 of the Large Hadron Collider pose new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run 1, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new microTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (GMT) which combines information from the muon trigger sub-systems and assigns the isolation variable. The upgraded GMT will be implemented using a Master Processor 7 card, built by Imperial College, that features a large Xilinx Virtex 7 FPGA. Up to 72 optical links at...

  1. LHCb VELO Upgrade

    CERN Document Server

    van Beuzekom, Martin; Ketel, Tjeerd; Gershon, Timothy; Parkes, Christopher; Reid, Matthew

    2011-01-01

    The VErtex LOcator (VELO) is a vital piece of apparatus for allowing precision measurements in hadronic physics. It provides not only superb impact parameter resolutions but also excellent momentum resolution, both important discriminating tools for precision high energy physics. This poster focuses on the R&D going into the future LHCb VELO detector. At present there are two proposed options for the upgrade; pixel chips or strip detectors. The LHCb upgrade is designed with higher luminosities and increased yields in mind. In order to get more out of the LHCb detector changes to the front end electronics will have to be made. At present, the first level hardware trigger is sets a limiting factor on the maximum efficiency for hadronic channels. As the VELO is positioned so close the proton-proton interaction region, whatever the choice of sensor, we will require efficient cooling and some proposed solutions are outlined. The LHCb TimePix telescope has had a very successful years running, with various devic...

  2. Industrial Clusters and Social Upgrading in Developing Countries

    DEFF Research Database (Denmark)

    Pyke, Frank; Lund-Thomsen, Peter

    In this article, we explore the relationship between industrial clusters and social upgrading in developing countries. Our article focuses on the hitherto little-considered influence of the economic and regulatory environment on the social upgrading of a cluster and on its governance system....... In doing so, we develop an analytical framework that seeks to explain how the enabling environment and different actors in cluster governance can either facilitate and/or hinder the process of social upgrading in cluster settings in developing countries. Finally, the conclusion outlines our main findings...

  3. The analysis and rationale behind the upgrading of existing standard definition thermal imagers to high definition

    Science.gov (United States)

    Goss, Tristan M.

    2016-05-01

    With 640x512 pixel format IR detector arrays having been on the market for the past decade, Standard Definition (SD) thermal imaging sensors have been developed and deployed across the world. Now with 1280x1024 pixel format IR detector arrays becoming readily available designers of thermal imager systems face new challenges as pixel sizes reduce and the demand and applications for High Definition (HD) thermal imaging sensors increases. In many instances the upgrading of existing under-sampled SD thermal imaging sensors into more optimally sampled or oversampled HD thermal imaging sensors provides a more cost effective and reduced time to market option than to design and develop a completely new sensor. This paper presents the analysis and rationale behind the selection of the best suited HD pixel format MWIR detector for the upgrade of an existing SD thermal imaging sensor to a higher performing HD thermal imaging sensor. Several commercially available and "soon to be" commercially available HD small pixel IR detector options are included as part of the analysis and are considered for this upgrade. The impact the proposed detectors have on the sensor's overall sensitivity, noise and resolution is analyzed, and the improved range performance is predicted. Furthermore with reduced dark currents due to the smaller pixel sizes, the candidate HD MWIR detectors are operated at higher temperatures when compared to their SD predecessors. Therefore, as an additional constraint and as a design goal, the feasibility of achieving upgraded performance without any increase in the size, weight and power consumption of the thermal imager is discussed herein.

  4. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  5. Regulatory requirements for replacement of analog systems with digital upgrades

    International Nuclear Information System (INIS)

    Loeser, P.J.

    1993-01-01

    This paper reviews briefly the regulatory guidelines which must be met in order to replace analog systems in nuclear power plants with digital systems. There is a move to do such replacements for a number of reasons: analog systems are aging, and showing considerable drift; few vendors manufacture analog systems today; support and parts are hard to get; digital systems provide flexibility. There is a safety concern however about undesirable and unpredictable effects to digital safety equipment due to plant transients, accidents, post-accident condition, and EMI/RF environmental interferences. License holders must comply with the requirements of 10 C.F.R. 50.59, which deals with safety concerns with respect to any changes to operating plants which may have an impact on the safety of the plant. NRC staff is taking the position that all digital upgrades will require an evaluation under this regulation

  6. SLC-2000: A luminosity upgrade for the SLC

    International Nuclear Information System (INIS)

    Breidenbach, M.; Decker, F.-J.; Helm, R.; Napoly, O.; Phinney, N.; Raimondi, P.; Raubenheimer, T.O.; Siemann, R.; Zimmermann, F.; Hertzbach, S.

    1996-01-01

    We discuss a possible upgrade to the Stanford Linear Collider (SLC), whose objective is to increase the SLC luminosity by at least a factor 7, to an average Z production rate of more than 35,000 per week. The centerpiece of the upgrade is the installation of a new superconducting final doublet with a field gradient of 240 T/m, which will be placed at a distance of only 70 cm from the interaction point. In addition, several bending magnets in each final focus will be lengthened and two octupole correctors are added. A complementary upgrade of damping rings and bunch compressors will allow optimum use of the modified final focus and can deliver, or exceed, the targeted luminosity. The proposed upgrade will place the SLC physics program in a very competitive position, and will also enable it to pursue its pioneering role as the first and only linear collider. (author)

  7. J-PARC accelerator and neutrino beamline upgrade programme

    Science.gov (United States)

    Friend, M.

    2017-09-01

    The 30 GeV proton beam from the J-PARC Main Ring (MR) accelerator is used to produce a world-class conventional neutrino beam - the neutrino source for the J-PARC long-baseline neutrino programme, including the current T2K experiment and proposed future experiments. Planned upgrades to increase the beam power of the MR from the current ˜400 kW to the design power of 750 kW and beyond, to 1.3+ MW, are underway. These include hardware modifications, such as upgrades of the MR magnet power supplies, RF systems, and feedback systems, as well as a change of the MR beam betatron tune point. Upgrades to the neutrino beamline, such as to the proton beam monitoring, horns, and radioactive material handling, will also be required to accommodate the increased proton beam power. An overview of planned J-PARC MR and neutrino facility upgrades is given.

  8. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    Science.gov (United States)

    Rossel, R. E.; Fedosseev, V. N.; Marsh, B. A.; Richter, D.; Rothe, S.; Wendt, K. D. A.

    2013-12-01

    With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The system contributes to four key aspects of RILIS operation: equipment monitoring, machine protection, automated self-reliance, and collaborative data acquisition. The overall concept, technologies used, implementation status and recent applications during the 2012 on-line operation period will be presented along with a summary of future developments.

  9. System upgrades to the DIII-D facility

    International Nuclear Information System (INIS)

    Kellman, A.G.

    2007-01-01

    Major upgrades to the DIII-D facility have been performed that significantly enhance the capability of both the DIII-D device and the entire facility. The most significant of these include the rotation of a neutral beam line, installation of a new lower divertor, and a significant set of new and enhanced diagnostics. The upgrades and initial results are presented in this paper

  10. CMS pixel upgrade project

    CERN Document Server

    Kaestli, Hans-Christian

    2010-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7~TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  11. CMS pixel upgrade project

    CERN Document Server

    INSPIRE-00575876

    2011-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7 TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  12. Expected performance of the upgrade ATLAS experiment for HL-LHC

    CERN Document Server

    Liu, Peilian; The ATLAS collaboration

    2018-01-01

    The Large Hadron Collider (LHC) has been successfully delivering proton-proton collision data at the unprecedented center of mass energy of 13 TeV. An upgrade is planned to increase the instantaneous luminosity delivered by the LHC in what is called the HL-LHC, aiming to deliver a total of up 3000/fb to 4000/fb of data per experiment. To cope with the expected data-taking conditions ATLAS is planning major upgrades of the detector. It is now a critical time for these upgrade projects and during the last year and a half, six Technical Design Reports (TDR) were produced by the ATLAS Collaboration. In these TDRs the physics motivation and benefits of such upgrades are discussed together with details on the upgrade project itself. In this contribution we review the expected performance of the upgraded ATLAS detector and the expected reach for physics measurements as well as the discovery potential for new physics that is expected by the end of the HL-LHC data-taking. The performance of object reconstruction under...

  13. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  14. Lawrence Berkeley Laboratory upgrading approaches to existing facilities

    International Nuclear Information System (INIS)

    Engle, H.M. Jr.

    1985-01-01

    The Lawrence Berkeley Laboratory Plant Engineering Department instituted a seismic risk investigation and seismic upgrade program in 1970. This paper covers the upgrade of two buildings with dissimilar framing systems; Building No. 10, a World War II vintage heavy timber frame building, and Building No. 80, a steel frame structure constructed in 1954. The seismic upgrade task for both structures required that the buildings be kept in service during rehabilitation with a minimum of disruption to occupants. Rehabilitations were phased over two and three year periods with construction management and supervision performed by LBL Plant Engineering staff

  15. Radiation hardened equipment and material data base

    International Nuclear Information System (INIS)

    Sumita, Kenji; Yamaoka, Hitoshi; Kakuta, Tsunemi; Shono, Yoshihiko; Nakamura, Tetsuo; Nakase, Yoshiaki; Furuta, Junichiro.

    1988-01-01

    In order to collect and put in order the results regarding radiation-withstanding equipment and materials, the Osaka Nuclear Science Association organized the committee composed of the experts in various fields in fiscal year 1986 for the purpose of building up the data base, and began the activity. From the trend of the research and development and the usefulness for the future, the fields of collecting data were decided as organic materials, optical fibers, semiconductor elements and compound semiconductors. By fiscal year 1987, the building-up of the prototype data base was aimed at, and system configuration, the making of the formats on the items and attributes of collected data, the action test of the system and so on were carried out. Under the background of the upgrading of LWRs, the development of FBRs and nuclear fusion reactors, the construction of a reprocessing plant and a low level waste storage facility, and the progress of various advanced technologies, the research on the equipment and materials having excellent radiation resistance and the development for heightening the performance have been carried out in many places separately, accordingly the activity for building up the prototype data base was begun, and about 600 cases were collected. (Kako, I.)

  16. Development of a serial powering scheme and a versatile characterization system for the ATLAS pixel detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Filimonov, Viacheslav

    2017-08-15

    In order to increase the probability of new discoveries the LHC will be upgraded to the HL-LHC. The upgrade of the ATLAS detector is an essential part of this program. The entire ATLAS tracking system will be replaced by an all-silicon detector called Inner Tracker (ITk) which should be able to withstand the increased luminosity of 5 x 10{sup 34} cm{sup -2}s{sup -1}. The work presented in this thesis is focused on the ATLAS ITk pixel detector upgrade. Advanced silicon pixel detectors will be an essential part of the ITk pixel detector where they will be used for tracking and vertexing. Characterization of the pixel detectors is one of the required tasks for a successful ATLAS tracker upgrade. Therefore, the work presented in this thesis includes the development of a versatile and modular test system for advanced silicon pixel detectors for the HL-LHC. The performance of the system is verified. Single and quad FE-I4 modules functionalities are characterized with the developed system. The reduction of the material budget of the ATLAS ITk pixel detector is essential for a successful operation at high luminosity. Therefore, a low mass, efficient power distribution scheme to power detector modules (serial powering scheme) is investigated as well in the framework of this thesis. A serially powered pixel detector prototype is built with all the components that are needed for current distribution, data transmission, sensor biasing, bypassing and redundancy in order to prove the feasibility of implementing the serial powering scheme in the ITk. Detailed investigations of the electrical performance of the detector prototype equipped with FE-I4 quad modules are made with the help of the developed readout system.

  17. Development of a serial powering scheme and a versatile characterization system for the ATLAS pixel detector upgrade

    International Nuclear Information System (INIS)

    Filimonov, Viacheslav

    2017-08-01

    In order to increase the probability of new discoveries the LHC will be upgraded to the HL-LHC. The upgrade of the ATLAS detector is an essential part of this program. The entire ATLAS tracking system will be replaced by an all-silicon detector called Inner Tracker (ITk) which should be able to withstand the increased luminosity of 5 x 10 34 cm -2 s -1 . The work presented in this thesis is focused on the ATLAS ITk pixel detector upgrade. Advanced silicon pixel detectors will be an essential part of the ITk pixel detector where they will be used for tracking and vertexing. Characterization of the pixel detectors is one of the required tasks for a successful ATLAS tracker upgrade. Therefore, the work presented in this thesis includes the development of a versatile and modular test system for advanced silicon pixel detectors for the HL-LHC. The performance of the system is verified. Single and quad FE-I4 modules functionalities are characterized with the developed system. The reduction of the material budget of the ATLAS ITk pixel detector is essential for a successful operation at high luminosity. Therefore, a low mass, efficient power distribution scheme to power detector modules (serial powering scheme) is investigated as well in the framework of this thesis. A serially powered pixel detector prototype is built with all the components that are needed for current distribution, data transmission, sensor biasing, bypassing and redundancy in order to prove the feasibility of implementing the serial powering scheme in the ITk. Detailed investigations of the electrical performance of the detector prototype equipped with FE-I4 quad modules are made with the help of the developed readout system.

  18. VVER-440 training simulators upgrades - Experience of CORYS T.E.S.S

    International Nuclear Information System (INIS)

    Bartak, J.; Fallon, B.

    2006-01-01

    The paper presents recent projects of upgrading screen operated simulators of VVER-440 nuclear power plants to full scale replica simulators, implemented by CORYS TESS. Control room replica full scope simulators were built for the Bohunice NPP in Slovakia and the Novovoronezh NPP in Russia. The scope of simulation was extended to reflect the current status of the units, which have undergone significant modernization programs over the last few years. The paper describes the software and hardware adaptations and evolutions of the existing simulators, the implementation in the simulator of modern supervision systems as well as of systems and equipment designed in the seventies and still used on the reference units. The training benefits of parallel use of control room replica and screen-operated simulators in the training process are discussed. (author)

  19. Remote upgrade and control system of NAT crossing based on mail protocol

    Directory of Open Access Journals (Sweden)

    Chen Lei

    2017-02-01

    Full Text Available This paper proposes a new scheme which uses transmits information such as related IP address and port by the mail server POP3 and SMTP protocol to realize net address turning (NAT crossing.The UDP connection between client and device node is realized by using "burrow" technology.Compared to the scheme that uses procedure server to realize NAT crossing schemes by the "burrow" technology,our scheme has advantages of saving operating costs,improving the stability of the system and enhancing the transferability of the system.With multiple equipment node,and a variety of network environment,we introduces the firmware update module,designs and realizes the remote upgrade and the control system of an intelligent device of Internet of Things based on the proposed scheme,and discusses the robustness of the system.

  20. Future of the CMS Muon System Upgrades and Aging

    CERN Document Server

    Pilot, Justin Robert

    2016-01-01

    The CMS detector currently includes three different muon detector types drift tubes (DT) in the central region, cathode strip chambers (CSC) in the forward regions, and resistive plate chambers (RPC) in both the forward and central regions. Several upgrade projects are planned to maintain high data-taking efficiency with the planned running conditions for the high-luminosity upgrade of the LHC. These upgrades are designed to ensure detector longevity and increase redundancy, while mitigating rate increases and retaining sensitivity to phyics processes. This involves changes to electronics and infrastructure of existing detectors, and adding new detectors in the forward region of the CMS experiment. Plans for each of the muon subsystems are described here in the context of the Phase-II upgrade schedule of the CMS experiment.

  1. Upgrading the BEPC control system

    International Nuclear Information System (INIS)

    Yang Liping; Wang Lizheng; Liu Shiyao

    1992-01-01

    The BEPC control system has been put into operation and operated normally since the end of 1987. Three years's experience shows this system can satisfy basically the operation requirements, also exhibits some disadvantages araised from the original centralized system architecture based on the VAX-VCC-CAMAC, such as slow response, bottle neck of VCC, less CPU power for control etc.. This paper describes the method and procedure for upgrading the BEPC control system which will be based on DEC net and DEC-WS, and thus intend to upgrade the control system architecture from the centralized to the distributed and improve the integral system performance. (author)

  2. Upgrade of reactor operation technology

    International Nuclear Information System (INIS)

    Itoh, Hideaki; Suzuki, Toshiaki; O-kawa, Toshikatsu

    2003-01-01

    To improve operational reliability and availability, the operation technology for a fast reactor was developed in the ''JOYO''. This report describes the upgrading of the simulator, plant operation management tools and fuel handling system for the MK-III core operation. The simulator was modified to the MK-III version to verify operation manuals, and to train operators in MK-III operation. The plant operation management tool was replaced on the operation experience to increase the reliability and efficiency of plant management works relating to plant operation and maintenance. To shorten the refueling period, the fuel handling system was upgraded to full automatic remote control. (author)

  3. Evaluation Of Gas Diffusion Through Plastic Materials Used In Experimental And Sampling Equipment

    DEFF Research Database (Denmark)

    Kjeldsen, Peter

    1993-01-01

    . Calculations show that diffusion of oxygen through plastic tubing and reactors into anoxic water can be a serious problem for a series of plastic materials. Comparison of the method for turbulent and laminar flow in tubings shows that the difference is insignificant for most cases. Calculations show also......Plastic materials are often used in experimental and sampling equipment. Plastics are not gas tight, since gases are able to diffuse through the walls of tubing and containers made of plastic. Methods for calculating the significance of gas diffusion through the walls of containers and the walls...... of tubings for both turbulent and laminar flow conditions is presented. A more complex model for diffusion under laminar flow conditions is developed. A comprehensive review on gas diffusion coefficients for the main gases (O2, N2, CO2, CH4 etc.) and for a long range of plastic materials is also presented...

  4. LHC Interaction Region Upgrade Phase I

    CERN Document Server

    Ostojic, R

    2009-01-01

    The LHC is starting operation with beam in 2008. The primary goal of CERN and the LHC community is to ensure that the collider is operated efficiently, maximizing its physics reach, and to achieve the nominal performance in the shortest term. Since several years the community has been discussing the directions for upgrading the experiments, in particular ATLAS and CMS, the LHC machine and the CERN proton injector complex. A well substantiated and coherent scenario for the first phase of the upgrade, which is foreseen in 2013, is now approved by CERN Council. In this paper, we present the goals and the proposed conceptual solution for the Phase-I upgrade of the LHC interaction regions. This phase relies on the mature Nb-Ti superconducting magnet technology, with the target of increasing the luminosity by a factor of 2-3 with respect to the nominal luminosity of 1034 cm-2s-1, while maximising the use of the existing infrastructure.

  5. The APS control system network upgrade

    International Nuclear Information System (INIS)

    Sidorowicz, K. v.; Leibfritz, D.; McDowell, W. P.

    1999-01-01

    When it was installed,the Advanced Photon Source (APS) control system network was at the state-of-the-art. Different aspects of the system have been reported at previous meetings [1,2]. As loads on the controls network have increased due to newer and faster workstations and front-end computers, we have found performance of the system declining and have implemented an upgraded network. There have been dramatic advances in networking hardware in the last several years. The upgraded APS controls network replaces the original FDDI backbone and shared Ethernet hubs with redundant gigabit uplinks and fully switched 10/100 Ethernet switches with backplane fabrics in excess of 20 Gbits/s (Gbps). The central collapsed backbone FDDI concentrator has been replaced with a Gigabit Ethernet switch with greater than 30 Gbps backplane fabric. Full redundancy of the system has been maintained. This paper will discuss this upgrade and include performance data and performance comparisons with the original network

  6. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, Walter; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred \\ifb\\ expected for LHC running to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for...

  7. Hardware upgrade for A2 data acquisition

    Energy Technology Data Exchange (ETDEWEB)

    Ostrick, Michael; Gradl, Wolfgang; Otte, Peter-Bernd; Neiser, Andreas; Steffen, Oliver; Wolfes, Martin; Koerner, Tito [Institut fuer Kernphysik, Mainz (Germany); Collaboration: A2-Collaboration

    2014-07-01

    The A2 Collaboration uses an energy tagged photon beam which is produced via bremsstrahlung off the MAMI electron beam. The detector system consists of Crystal Ball and TAPS and covers almost the whole solid angle. A frozen-spin polarized target allows to perform high precision measurements of polarization observables in meson photo-production. During the last summer, a major upgrade of the data acquisition system was performed, both on the hardware and the software side. The goal of this upgrade was increased reliability of the system and an improvement in the data rate to disk. By doubling the number of readout CPUs and employing special VME crates with a split backplane, the number of bus accesses per readout cycle and crate was cut by a factor of two, giving almost a factor of two gain in the readout rate. In the course of the upgrade, we also switched most of the detector control system to using the distributed control system EPICS. For the upgraded control system, some new tools were developed to make full use of the capabilities of this decentralised slow control and monitoring system. The poster presents some of the major contributions to this project.

  8. Upgrade of the ATLAS Level-1 Calorimeter Trigger

    CERN Document Server

    Wessels, M; The ATLAS collaboration

    2014-01-01

    The Level-1 Calorimeter Trigger (L1Calo) of the ATLAS experiment has been operating well since the start of LHC data taking, and played a major role in the Higgs boson discovery. To face the new challenges posed by the upcoming increases of the LHC proton beam energy and luminosity, a series of upgrades is planned for L1Calo. The initial upgrade phase in 2013-14 includes substantial improvements to the analogue and digital signal processing to allow more sophisticated digital filters for energy and timing measurement, as well as compensate for pile-up and baseline shifting effects. Two existing digital algorithm processor subsystems will receive substantial hardware and firmware upgrades to increase the real-time data path bandwidth, allowing topological information to be transmitted and processed at Level-1. An entirely new subsystem, the Level-1 Topological Processor, will receive real-time data from both the upgraded L1Calo and Level-1 Muon Trigger to perform trigger algorithms based on entire event topolo...

  9. Advantages of customer/supplier involvement in the upgrade of River Bend`s IST program

    Energy Technology Data Exchange (ETDEWEB)

    Womack, R.L.; Addison, J.A.

    1996-12-01

    At River Bend Station, IST testing had problems. Operations could not perform the test with the required repeatability; engineering could not reliably trend test data to detect degradation; licensing was heavily burdened with regulatory concerns; and maintenance could not do preventative maintenance because of poor prediction of system health status. Using Energy`s Total Quality principles, it was determined that the causes were: lack of ownership, inadequate test equipment usage, lack of adequate procedures, and lack of program maintenance. After identifying the customers and suppliers of the IST program data, Energy management put together an upgrade team to address these concerns. These customers and suppliers made up the IST upgrade team. The team`s mission was to supply River Bend with a reliable, functional, industry correct and user friendly IST program. The IST program in place went through a verification process that identified and corrected over 400 individual program discrepancies. Over 200 components were identified for improved testing methods. An IST basis document was developed. The operations department was trained on ASME Section XI testing. All IST tests have been simplified and shortened, due to heavy involvement by operations in the procedure development process. This significantly reduced testing time, resulting in lower cost, less dose and greater system availability.

  10. Protective equipment use among female rugby players.

    Science.gov (United States)

    Comstock, R Dawn; Fields, Sarah K; Knox, Christy L

    2005-07-01

    Our objective was to assess the prevalence of protective equipment use and the motivation for using protective equipment among a sample of US female rugby players. We surveyed a convenience sample of 234 current US female rugby players from 14 teams participating in a US women's rugby tournament, obtaining self-reported demographic, rugby exposure, and protective equipment use information. Mouthguards were the most commonly used piece of protective equipment: 90.8% of players reported having always worn a mouthguard while playing or practicing rugby within their most recent 3 months of play. Fewer than 15% of players reported having always worn other types of protective equipment. Equipment use varied by playing position. Whereas over 80% of players in all other positions always wore a mouthguard, 66.7% of scrum halves reported always wearing one. Both backs and forwards reported wearing shoulder pads, but only forwards reported always wearing padded headgear. Mouthguards, padded headgear, and shoulder pads were worn "to prevent injury," whereas ankle braces, neoprene sleeves, and athletic tape on joints were worn "to protect a current/recent injury." This is the first study of female rugby players to assess the prevalence of protective equipment use by playing position and the motivation for using protective equipment. With the exception of mouthguards, US female rugby players infrequently use protective equipment. Protective equipment use varies by playing position. Some types of protective equipment appear to be used as primary prevention mechanisms, whereas others are used as secondary or tertiary prevention mechanisms.

  11. TMX-Upgrade vacuum-system design and analysis

    International Nuclear Information System (INIS)

    Simonen, T.C.; Chargin, A.K.; Drake, R.P.; Nexsen, W.E.; Pickles, W.L.; Poulsen, P.; Stack, T.P.; Wong, R.L.

    1981-10-01

    This paper describes the design and analysis of the TMX Upgrade Vacuum System. TMX Upgrade is a modification of the TMX tandem mirror device. It will employ thermal barriers to further improve plasma confinement. Thermal barriers are produced by microwave heating and neutral-beam pumping. They increase the feasibility of tandem-mirror reactors by reducing both the required magnetic field strengths and the neutral-beam injection voltages

  12. Improvement in the competitiveness of an upgrading process of whole-tree chips; Kokopuuhakkeen puhdistusprosessin kilpailukyvyn parantaminen

    Energy Technology Data Exchange (ETDEWEB)

    Asplund, D [Jyvaeskylaen Teknologiakeskus Oy, Jyvaeskylae (Finland); Seppaenen, V [VTT Energy, Jyvaeskylae (Finland)

    1997-12-01

    Development of the upgrading method for whole-tree chips will be continued from the stage achieved in connection with the construction of the Kankaanpaeae demonstration plant in Finland. The aim is to reduce production costs by process-technical modifications and by equipment development and to increase the value of products. The target is to reduce the production costs of the fuel by at least FIM 7/MWh and to assort the pine pulp chips at least to two classes on the basis of fibre length. In preliminary tests with fibre length, principles of assorting were determined. Tests were carried out with a belt conveyor that throws chips to different distances according to mass and volume. The aim is to assort the chips according to dry-fresh density, which correlates with the fibre length. Modifications were designed and realised at the MASSAHAKE plant for the production of pine chips. By changing the chip size the pine chips can be upgraded in accordance with the pricing of saw chips. Process-technical changes can also be made to improve the yield and bark content of pulp chips. The economic effect of these modifications will not be seen until the pricing of products corresponds to the calculations. The changes affecting the yield will be realised according to the production level. It has been verified that it is possible to achieve cost savings and additional income, when the fuel cost is reduced by FIM 4.3 - 34.8/MWh, depending on the method of calculation. The project will be continued in 1997 by further development of assorting, by process and equipment-technical development of the MASSAHAKE method and by applying results to practice. (orig.)

  13. The CDF II eXtremely fast tracker upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abulencia, A.; Azzurri, P.; Cochran, E.; Dittmann, J.; Donati, S.; Efron, J.; Erbacher, R.; Errede, D.; Fedorko, I.; Flanagan, G.; Forrest, R.; /Illinois U., Urbana

    2006-09-01

    The CDF II Extremely Fast Tracker is the trigger track processor which reconstructs charged particle tracks in the transverse plane of the CDF II central outer tracking chamber. The system is now being upgraded to perform a three dimensional track reconstruction. A review of the upgrade is presented here.

  14. Instrumentation and control upgrade evaluation methodology. Volume 1: Manual. Final report

    International Nuclear Information System (INIS)

    Bliss, M.; Brown, E.; Florio, F.; Stofko, M.

    1996-07-01

    This methodology manual describes how to develop an Upgrade Evaluation Report (UER) for an I and C system that has been identified as an upgrade candidate in the I and C Life Cycle Management Plan (LCMP). A UER can be developed by a nuclear power plant to determine the cost-effectiveness and feasibility of upgrading an aging or obsolete Instrumentation and Control (I and C) System. A separate UER is developed for each upgrade candidate system. A UER will determine if a given system requires an upgrade or if it is more cost-effective to maintain the present system. If an upgrade is unnecessary, the system will be reclassified as a retained system and a system maintenance plan will be developed for it. This manual is accompanied by a workbook (EPRI TR-104963-V2) which contains various worksheets, outlines, and generic interview questions that aid in the UER development process

  15. Energy Reconstruction and high-speed Data Transmission with FPGAs for the Upgrade of the ATLAS Liquid Argon Calorimeter at LHC

    CERN Document Server

    Stärz, Steffen

    The Liquid Argon calorimeter of the ATLAS detector at CERN near Geneva is equipped with improved readout and trigger electronics for the operation at higher luminosity LHC in the frame of several upgrades (Phase-0, I, and II). Special attention is given to an early digitisation of detector raw data and their following digital data transmission and processing via FPGAs already for the Level-1 trigger. The upgrades additionally foresee to provide higher spatial granularity information for the Level-1 trigger in order to improve its performance for low momentum single particles at increased collision rates. The first part of this dissertation contains the development and implementation of a modular detector simulation framework, AREUS, which allows to analyse different filter algorithms for the energy reconstruction as well as their performance with respect to the expected digitised detector raw data. In this detector simulation framework the detailed algorithmic functionality of the FPGAs has been taken into ac...

  16. Microbial biocatalyst developments to upgrade fossil fuels.

    Science.gov (United States)

    Kilbane, John J

    2006-06-01

    Steady increases in the average sulfur content of petroleum and stricter environmental regulations concerning the sulfur content have promoted studies of bioprocessing to upgrade fossil fuels. Bioprocesses can potentially provide a solution to the need for improved and expanded fuel upgrading worldwide, because bioprocesses for fuel upgrading do not require hydrogen and produce far less carbon dioxide than thermochemical processes. Recent advances have demonstrated that biodesulfurization is capable of removing sulfur from hydrotreated diesel to yield a product with an ultra-low sulfur concentration that meets current environmental regulations. However, the technology has not yet progressed beyond laboratory-scale testing, as more efficient biocatalysts are needed. Genetic studies to obtain improved biocatalysts for the selective removal of sulfur and nitrogen from petroleum provide the focus of current research efforts.

  17. SLHC, the High-Luminosity Upgrade (public event)

    CERN Multimedia

    CERN. Geneva

    2010-01-01

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  18. Tackling Chinese Upgrading through Experimentalism and Pragmatism

    DEFF Research Database (Denmark)

    Kirkegaard, Julia Kirch

    2017-01-01

    This paper examines the development of China’s wind turbine industry, shedding light on the Chinese mode of disruptive industrial upgrading through policy pragmatism and fragmented, experimental governance. Based on a historical analysis of China’s wind turbine industry, the paper highlights three...... distinct phases, which are all marked by their own inbuilt and potentially self-disruptive impasses and associated crises. In turn, these impasses have forced the Chinese government into radical and flexible interventions, which have spurred on Chinese companies to creatively find new ways to develop...... and upgrade. The paper illustrates the transformation of Sino–foreign relations by China’s non-linear upgrading approach, particularly during the Chinese wind power industry’s quality crisis, and its development model. It also discusses the implications this examination of China’s approach has...

  19. Silicon sensors for the upgrades of the CMS pixel detector

    International Nuclear Information System (INIS)

    Centis Vignali, Matteo

    2015-12-01

    The Compact Muon Solenoid (CMS) is a general purpose detector at the Large Hadron Collider (LHC). The LHC luminosity is constantly increased through upgrades of the accelerator and its injection chain. Two major upgrades will take place in the next years. The first upgrade involves the LHC injector chain and allows the collider to achieve a luminosity of about 2.10 34 cm -2 s -1 . A further upgrade of the LHC foreseen for 2025 will boost its luminosity to 5.10 34 cm -2 s -1 . As a consequence of the increased luminosity, the detectors need to be upgraded. In particular, the CMS pixel detector will undergo two upgrades in the next years. The first upgrade (phase I) consists in the substitution of the current pixel detector in winter 2016/2017. The upgraded pixel detector will implement new readout electronics that allow efficient data taking up to a luminosity of 2.10 34 cm -2 s -1 , twice as much as the LHC design luminosity. The modules that will constitute the upgraded detector are being produced at different institutes. Hamburg (University and DESY) is responsible for the production of 350 pixel modules. The second upgrade (phase II) of the pixel detector is foreseen for 2025. The innermost pixel layer of the upgraded detector will accumulate a radiation damage corresponding to an equivalent fluence of Φ eq =2.10 16 cm -2 and a dose of ∼10 MGy after an integrated luminosity of 3000 fb -1 . Several groups are investigating sensor designs and configurations able to withstand such high doses and fluences. This work is divided into two parts related to important aspects of the upgrades of the CMS pixel detector. For the phase I upgrade, a setup has been developed to provide an absolute energy calibration of the pixel modules that will constitute the detector. The calibration is obtained using monochromatic X-rays. The same setup is used to test the buffering capabilities of the modules' readout chip. The maximum rate experienced by the modules produced in

  20. Tritium depth profiling in carbon samples from fusion experiments

    International Nuclear Information System (INIS)

    Friedrich, M.; Pilz, W.; Sun, G.; Behrisch, R.; Garcia-Rosales, C.; Bekris, N.; Penzhorn, R.-D.

    2000-01-01

    Tritium depth profiling by accelerator mass spectrometry has been performed at the Rossendorf 3 MV Tandetron. Tritium particles are counted after the accelerator using a semiconductor detector, while deuterium and other light elements are simultaneously measured with the Faraday cup between the injection magnet and the accelerator. Depth profiles have been measured in carbon samples cut from the first wall tiles of the Garching fusion experiment ASDEX-Upgrade and of the European fusion experiment JET, Culham/UK. Tritium contents in the JET samples were up to six orders higher than in samples from ASDEX-Upgrade. Tritium beam currents from samples with high tritium content were measured partly in the Faraday cup before the accelerator. A dedicated tritium AMS facility with an air-insulated 100 kV tandem accelerator is under construction

  1. Possibilities for automating coal sampling

    Energy Technology Data Exchange (ETDEWEB)

    Helekal, J; Vankova, J

    1987-11-01

    Outlines sampling equipment in use (AVR-, AVP-, AVN- and AVK-series samplers and RDK- and RDH-series separators produced by the Coal Research Institute, Ostrava; extractors, crushers and separators produced by ORGREZ). The Ostrava equipment covers bituminous coal needs while ORGREZ provides equipment for energy coal requirements. This equipment is designed to handle coal up to 200 mm in size at a throughput of up to 1200 t/h. Automation of sampling equipment is foreseen.

  2. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  3. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  4. Meteorological testing and analysis of sampling equipment for wet deposition

    International Nuclear Information System (INIS)

    Winkler, P.; Jobst, S.; Harder, C.

    1989-01-01

    11 rain collector types for wet deposition were subjected to a field test. Two of the nine types were identically constructed. The following measured values were analyzed: amount of rainfall, electrical conductivity, pH value, Cl - , NO 3 - , SO 4 = , NH 4 + , Na + , K + , Ca ++ , Mg ++ , Fe, Pb, Cu, Cd. The analysis was restricted to rainfall. In a basic study structural and statistical analyses of precipitations were made in order to find out from which extent of intensity resp. rain volume per rainfall the precipitations are important for wet deposition. Some sensors required intensities of nearly 1 mm/h in order to recognize all rainfalls. In order to reach a better standardization of the measuring technique the funnel geometry should be standardized. The current technique is not suited for correctly registering the deposition which is connected with light and very light rainfall. It was found out in rinsing tests with diluted HNO 3 that considerable amounts of trace metals accumulate at funnel walls and in headers, although the collecting device had been subjected to a thorough acid purification before. For the determination of the wet deposition of the trace metals problems arise if the samples are filtered and the filters are not analyzed. In that case particle-bound metals which are suspended in raindrops will not be registered. After comparing the equipment some of the devices were improved in order to eliminate known sources of contamination. (orig./KW) [de

  5. Major upgrades of the high frequency B-dot probe diagnostic suite on ASDEX Upgrade

    Directory of Open Access Journals (Sweden)

    Ochoukov Roman

    2017-01-01

    Full Text Available The high frequency B-dot (HFB probe diagnostic on the ASDEX Upgrade tokamak has undergone a considerable upgrade during the 2016 opening of the torus. The probe coverage is now greatly expanded toroidally, as well as radially with the addition of probes on the high field side and the removable manipulator head. A new 2-channel fast digitizer now allows to examine and record radio frequency (RF wave emissions emanating from the plasma in the ion cyclotron range of frequencies (ICRF. Possible studies that can be achieved now include: a study of core ICRF power absorption efficiency; a study of ion cyclotron emissions from the plasma generated by energetic ions; and study of ICRF wave/plasma turbulence interactions in the scrape-off layer region.

  6. Efficient Ways to Upgrade Docker Containers in Cloud to Support Backward Compatibility : Various Upgrade Strategies to Measure Complexity

    OpenAIRE

    MADALA, SRAVYA

    2016-01-01

    If the present world scenario in telecommunication systems is considered thousands of systems are getting moved into the cloud because of its wide features. This thesis explains the efficient ways to upgrade Docker containers in a way to support backward compatibility. It mainly concerns about the high-availability of systems in the cloud environment during upgrades. Smaller changes can be implemented automatically to some extent. The minor changes can be handled by Apache Avro where schema i...

  7. Catalytic upgrading of bio-oil produced from hydrothermal liquefaction of Nannochloropsis sp.

    Science.gov (United States)

    Shakya, Rajdeep; Adhikari, Sushil; Mahadevan, Ravishankar; Hassan, El Barbary; Dempster, Thomas A

    2018-03-01

    Upgrading of bio-oil obtained from hydrothermal liquefaction (HTL) of algae is necessary for it to be used as a fuel. In this study, bio-oil obtained from HTL of Nannochloropsis sp. was upgraded using five different catalysts (Ni/C, ZSM-5, Ni/ZSM-5, Ru/C and Pt/C) at 300 °C and 350 °C. The upgraded bio-oil yields were higher at 300 °C; however, higher quality upgraded bio-oils were obtained at 350 °C. Ni/C gave the maximum upgraded bio-oil yield (61 wt%) at 350 °C. However, noble metal catalysts (Ru/C and Pt/C) gave the better upgraded bio-oils in terms of acidity, heating values, and nitrogen values. The higher heating value of the upgraded bio-oils ranged from 40 to 44 MJ/kg, and the nitrogen content decreased from 5.37 to 1.29 wt%. Most of the upgraded bio-oils (35-40 wt%) were in the diesel range. The major components present in the gaseous products were CH 4 , CO, CO 2 and lower alkanes. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Progress and plan of KSTAR plasma control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Sang-hee, E-mail: hahn76@nfri.re.kr [National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, Y.J. [National Fusion Research Institute, Daejeon (Korea, Republic of); Penaflor, B.G. [General Atomics, San Diego, CA (United States); Bak, J.G.; Han, H.; Hong, J.S.; Jeon, Y.M.; Jeong, J.H.; Joung, M.; Juhn, J.W.; Kim, J.S.; Kim, H.S.; Lee, W.R.; Woo, M.H. [National Fusion Research Institute, Daejeon (Korea, Republic of); Eidietis, N.W.; Ferron, J.R.; Humphreys, D.A.; Hyatt, A.; Johnson, R.D.; Piglowski, D.A. [General Atomics, San Diego, CA (United States); and others

    2016-11-15

    Highlights: • Recent achievements of the KSTAR plasma control system are described. • Requirements and results of the testbed system for the future upgrade of the KSTAR plasma control system are presented. • An overview of the upgrade layout based is given. - Abstract: The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ∼48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable during the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.

  9. Investigation of thermal integration between biogas production and upgrading

    International Nuclear Information System (INIS)

    Zhang, Xiaojing; Yan, Jinying; Li, Hailong; Chekani, Shabnam; Liu, Loncheng

    2015-01-01

    Highlights: • Identify thermal characteristics of amine-based biogas upgrading for waste heat recovery. • Identify thermal characteristics of AD biogas production as sink for heat recovery. • Evaluation of thermal integration between biogas production and upgrading to improve overall energy efficiency. • Cost analysis applied for the economic feasibility of the thermal integration. • Using the principles of target design and system integration for connected thermal processes. - Abstract: Thermal integration of anaerobic digestion (AD) biogas production with amine-based chemical absorption biogas upgrading has been studied to improve the overall efficiency of the intergraded system. The thermal characteristics have been investigated for industrial AD raw biogas production and amine-based chemical absorption biogas upgrading. The investigation provides a basic understanding for the possibilities of energy saving through thermal integration. The thermal integration is carried out through well-defined cases based on the thermal characteristics of the biogas production and the biogas upgrading. The following factors are taken into account in the case study: thermal conditions of sub-systems, material and energy balances, cost issues and main benefits. The potential of heat recovery has been evaluated to utilise the waste heat from amine-based upgrading process for the use in the AD biogas production. The results show that the thermal integration has positive effects on improving the overall energy efficiency of the integrated biogas plant. Cost analysis shows that the thermal integration is economically feasible

  10. Control system upgrades support better plant economics

    International Nuclear Information System (INIS)

    De Grosbois, J.; Hepburn, A.; Storey, H.; Basso, R.; Kumar, V.

    2002-01-01

    This paper (second in the series, see [1]) provides insight on how nuclear plants can achieve better efficiencies and reduced operations and maintenance (O and M) costs through focused control system upgrades. An understanding of this relationship is necessary to properly assess the economics of plant refurbishment decisions. Traditional economic feasibility assessment methods such as benefit cost analysis (BCA), internal rate of return (IRR), benefit cost ratios (B/C), or payback analysis are often performed without full consideration of project alternatives, quantified benefits, and life cycle costing. Consideration must be given to not only capital cost and project risk, but also to the potential economic benefits of new technology and added functionality offered by plant upgrades. Recent experience shows that if upgrades are focused on priority objectives, and are effectively implemented, they can deliver significant payback over the life of the plant, sometimes orders of magnitude higher than their initial capital cost. The following discussion explores some of the key issues and rationale behind upgrade decisions and their impact on improved plant efficiency and reduced O and M costs. A subsequent paper will explain how the justification for these improvements can be captured in an economic analysis and feasibility study to support strategic decision-making in a plant refurbishment context. (author)

  11. ATLAS Muon Spectrometer Upgrades for the High Luminosity LHC

    CERN Document Server

    Valderanis, Chrysostomos; The ATLAS collaboration

    2015-01-01

    ATLAS Muon Spectrometer Upgrades for the High Luminosity LHC The luminosity of the LHC will increase up to 2x10^34 cm-2s-1 after the long shutdown in 2019 (phase-1 upgrade) and up to 7x10^34 cm-2s-1 after the long shutdown in 2025 (phase-2 upgrade). In order to cope with the increased particle fluxes, upgrades are envisioned for the ATLAS muon spectrometer. At phase-1, the current innermost stations of the ATLAS muon endcap tracking system (the Small Wheels) will be upgraded with 2x4-layer modules of Micromega detectors, sandwiched by two 4 layer modules of small strip Thin Gap Chambers on either side. Each 4-layer module of the so-called New Small Wheels covers a surface area of approximately 2 to 3 m2 for a total active area of 1200 m2 each for the two technologies. On such large area detectors, the mechanical precision (30 \\mu m along the precision coordinate and 80 \\mu m along the beam) is a key point and must be controlled and monitored along the process of construction and integration. The design and re...

  12. Thes - Website for Thermal Shields Upgrade Management

    CERN Document Server

    Micula, Adina

    2013-01-01

    There are a total of 1695 thermal shields (TS) in the interconnections between the superconducting magnets. During LHC Long Shutdown 1 (LS1) all of these TS are being upgraded with a new fixation design. This procedure involves the transport of all the TS from LHC to a workshop on the surface where they are being modified and the subsequent transport of the upgraded TS back to the tunnel where they are laid on the cryostats and await the closure of the interconnection. These operations have to be carefully coordinated in order to ensure that there are always enough modified TS to satisfy the demand in the tunnel and respect the time constraint imposed by the schedule of LS1. As part of my summer project, I developed a database driven website whose aim is to enable the TS upgrade monitoring.

  13. Experiences in controlling the upgrading of TRIGA 2000 Bandung reactor

    International Nuclear Information System (INIS)

    Huda, K.; Wibowo, Y.W.; Suprawhardana, M.S.

    2001-01-01

    TRIGA 2000 Bandung Reactor was established in 1961 for research, education and isotope production purposes. The reactor reached its first criticality in October 1964 and operated at nominal power of 250 kW until 1971. In 1971 the reactor was upgraded to the power level of 1000 kW. In order to raise the capacity of isotope production, the reactor has been upgraded again to the power level of 2000 kW. During the modification of the reactor, the Center for Research and Development of Nuclear Techniques (CRDNT) was management of the reactor as it faced many problems, either technical or non-technical ones. This caused the upgrading activities to take a long time. At this time, the reactor upgrading has almost finished, and the nuclear commissioning is going on. Several aspects and problems associated with the upgrading process have been reviewed and the results are discussed in the present paper. (author)

  14. Upgraded coal interest group. Quarterly report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Weber, W. [Electric Power Research Inst., Chattanooga, TN (United States); Lebowitz, H.E. [Fossil Fuel Sciences, Palo Alto, CA (United States)

    1995-12-31

    The objectives of the Upgraded Coal Interest Group (UCIG) are as follows: Review and update the status of various coal upgrading technologies and developments and critically assess the results. Perform engineering screening analyses on various coal upgrading approaches. Perform commercialization analyses that will promote the availability and use of upgraded coal products by quantifying the benefits of using them. Identify market opportunities for introduction of upgraded coals. Perform critical analyses on a variety of coals and technologies in areas important to users but not readily available. Perform critical experiments which will show the differences between technologies.

  15. Integrated oil production and upgrading using molten alkali metal

    Science.gov (United States)

    Gordon, John Howard

    2016-10-04

    A method that combines the oil retorting process (or other process needed to obtain/extract heavy oil or bitumen) with the process for upgrading these materials using sodium or other alkali metals. Specifically, the shale gas or other gases that are obtained from the retorting/extraction process may be introduced into the upgrading reactor and used to upgrade the oil feedstock. Also, the solid materials obtained from the reactor may be used as a fuel source, thereby providing the heat necessary for the retorting/extraction process. Other forms of integration are also disclosed.

  16. Soundness confirmation through cold test of the system equipment of HTTR

    International Nuclear Information System (INIS)

    Ono, Masato; Shinohara, Masanori; Iigaki, Kazuhiko; Tochio, Daisuke; Nakagawa, Shigeaki; Shimazaki, Yosuke

    2014-01-01

    HTTR was established at the Oarai Research and Development Center of Japan Atomic Energy Agency, for the purpose of the establishment and upgrading of high-temperature gas-cooled reactor technology infrastructure. Currently, it performs a safety demonstration test in order to demonstrate the safety inherent in high-temperature gas-cooled reactor. After the Great East Japan Earthquake, it conducted confirmation test for the purpose of soundness survey of facilities and equipment, and it confirmed that the soundness of the equipment was maintained. After two years from the confirmation test, it has not been confirmed whether the function of dynamic equipment and the soundness such as the airtightness of pipes and containers are maintained after receiving the influence of damage or deterioration caused by aftershocks generated during two years or aging. To confirm the soundness of these facilities, operation under cold state was conducted, and the obtained plant data was compared with confirmation test data to evaluate the presence of abnormality. In addition, in order to confirm through cold test the damage due to aftershocks and degradation due to aging, the plant data to compare was supposed to be the confirmation test data, and the evaluation on abnormality of the plant data of machine starting time and normal operation data was performed. (A.O.)

  17. Installation and Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Onel, Yasar

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade was performed during the Extended Year End Technical Stop of 2016-2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics was also being upgraded to QIE10-based electronics which will implement larger dynamic range and a 6-bit TDC to provide additional handles to eliminate the background. Following this major upgrade, the Hadron Forward Calorimeters are being commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  18. Upgrade of the ATLAS Level-1 Calorimeter Trigger

    CERN Document Server

    AUTHOR|(CDS)2072874

    2014-01-01

    The Level-1 calorimeter trigger (L1Calo) operated successfully during the first data taking phase of the ATLAS experiment at the LHC. Facing the new challenges posed by the upcoming increases of the LHC beam energy and luminosity, and from the experience of the previous running, a series of upgrades is planned for L1Calo. The initial upgrade phase in 2013-14 includes substantial improvements to the analogue and digital signal processing to cope with baseline shifts due to signal pile-up. Additionally a newly introduced system will receive real-time data from both the upgraded L1Calo and L1Muon trigger to perform trigger algorithms based on entire event topologies. During the second upgrade phase in 2018-19 major parts of L1Calo will be rebuilt in order to exploit a tenfold increase in the available calorimeter data granularity compared to that of the current system. The contribution gives an overview of the existing system and the lessons learned during the first period of LHC data taking. Based on these, the...

  19. Upgrade of the ATLAS Level-1 Calorimeter Trigger

    CERN Document Server

    Mueller, Felix; The ATLAS collaboration

    2014-01-01

    The Level-1 calorimeter trigger (L1Calo) operated successfully during the first data taking phase of the ATLAS experiment at the LHC. Based on the lessons learned , a series of upgrades is planned for L1Calo to face the new challenges posed by the upcoming increases of the LHC beam energy and luminosity. The initial upgrade phase in 2013-14 includes substantial improvements to the analogue and digital signal processing to cope with baseline shifts due to signal pile-up. Additionally a newly introduced system will receive real-time data from both the upgraded L1Calo and L1Muon trigger to perform trigger algorithms based on entire event topologies. During the second upgrade phase in 2018-19 major parts of L1Calo will be rebuilt in order to exploit a tenfold increase in the available calorimeter data granularity compared to that of the current system. In this contribution we present the lessons learned during the first period of LHC data taking. Based on these we discuss the expected performance improvements tog...

  20. DAQ Architecture for the LHCb Upgrade

    International Nuclear Information System (INIS)

    Liu, Guoming; Neufeld, Niko

    2014-01-01

    LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run at a high luminosity of 2 × 10 33 cm −2 s −1 . The upgraded detector will be read out at 40 MHz with a highly flexible software-based triggering strategy. The Data Acquisition (DAQ) system of LHCb reads out the data fragments from the Front-End Electronics and transports them to the High-Lever Trigger farm at an aggregate throughput of ∼ 32 Tbit/s. The DAQ system will be based on high speed network technologies such as InfiniBand and/or 10/40/100 Gigabit Ethernet. Independent of the network technology, there are different possible architectures for the DAQ system. In this paper, we present our studies on the DAQ architecture, where we analyze size, complexity and relative cost. We evaluate and compare several data-flow schemes for a network-based DAQ: push, pull and push with barrel-shifter traffic shaping. We also discuss the requirements and overall implications of the data-flow schemes on the DAQ system.

  1. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Souza, J; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5-fold compared to the design luminosity (10exp34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2023. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. The smallest independent on-detector electronics module has been reduced from 45 channels to 6, greatly reducing the consequences of a failure in the on-detector electronics. The size of t...

  2. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Reed, Robert; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the main hadronic calorimeter covering the central region of the ATLAS experiment at LHC. TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC operation (Phase 2 around 2023) where the peak luminosity will increase 5x compared to the design luminosity (10^{34} cm^{-2}s^{-1}) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims to replace the majority of the on- and off-detector electronics so that all calorimeter signals can be digitized and directly sent to the off-detector electronics in the counting room. This will reduce pile-up problems and allow more complex trigger algorithms. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to t...

  3. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2016-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase 2) where the peak luminosity will increase 5$\\times$ compared to the design luminosity ($10^{34} cm^{-2}s^{-1}$) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to the counting room while 5 Gbps down-links are used for synchronization, c...

  4. Emergency operating procedure upgrade program and audit results

    International Nuclear Information System (INIS)

    Graham, P.D.

    1989-01-01

    This paper describes the method and results of upgrading the River Bend station boiling water reactor 6 emergency operating procedures (EOPs). The upgrade program replaced difficult-to-implement narrative procedures with well-developed flowcharts. The flowcharts eliminate a number of human factors problems, are user friendly, provide for easy implementation, and provide technical information in a clear, concise format. Positive results were seen immediately. The operating crews found the flowcharts to be clear, understandable, and usable. Simulator training and EOP implementation became something that the operators no longer dreaded, and their confidence in their ability to control emergency situations was greatly improved. The paper provides a summary of the EOP upgrade program

  5. The upgrade of the CMS hadron calorimeter with silicon photomultipliers

    CERN Document Server

    Strobbe, N

    2017-01-01

    The upgrade of the hadron calorimeter of the CMS experiment at the CERN Large Hadron Collider is currently underway. The endcap sections will be upgraded in the winter of 2016–2017 and the barrel sections during the second LHC long shutdown in 2019. The existing photosensors will be replaced with about 16 000 new silicon photomultipliers (SiPMs), resulting in the first large installation of SiPMs in a radiation environment. All associated front-end electronics will also be upgraded. This paper discusses the motivation for the upgrade and provides a description 17 of the new system, including the SiPMs with associated control electronics and the front-end readout cards.

  6. Computer codes used during upgrading activities at MINT TRIGA reactor

    International Nuclear Information System (INIS)

    Mohammad Suhaimi Kassim; Adnan Bokhari; Mohd Idris Taib

    1999-01-01

    MINT TRIGA Reactor is a 1-MW swimming pool nuclear research reactor commissioned in 1982. In 1993, a project was initiated to upgrade the thermal power to 2 MW. The IAEA assistance was sought to assist the various activities relevant to an upgrading exercise. For neutronics calculations, the IAEA has provided expert assistance to introduce the WIMS code, TRIGAP, and EXTERMINATOR2. For thermal-hydraulics calculations, PARET and RELAP5 were introduced. Shielding codes include ANISN and MERCURE. However, in the middle of 1997, MINT has decided to change the scope of the project to safety upgrading of the MINT Reactor. This paper describes some of the activities carried out during the upgrading process. (author)

  7. Nitric Acid Revamp and Upgrading of the Alarm & Protection Safety System at Petrokemija, Croatia

    Directory of Open Access Journals (Sweden)

    Hoško, I.

    2012-04-01

    Full Text Available Every industrial production, particularly chemical processing, demands special attention in conducting the technological process with regard to the security requirements. For this reason, production processes should be continuously monitored by means of control and alarm safety instrumented systems. In the production of nitric acid at Petrokemija d. d., the original alarm safety system was designed as a combination of an electrical relay safety system and transistorized alarm module system. In order to increase safety requirements and modernize the technological process of nitric acid production, revamping and upgrading of the existing alarm safety system was initiated with a new microprocessor system. The newly derived alarm safety system, Simatic PCS 7, links the function of "classically" distributed control (DCS and logical systems in a common hardware and software platform with integrated engineering tools and operator interface to meet the minimum safety standards with safety integrity level 2 (SIL2 up to level 3 (SIL3, according to IEC 61508 and IEC 61511. This professional paper demonstrates the methodology of upgrading the logic of the alarm safety system in the production of nitric acid in the form of a logical diagram, which was the basis for a further step in its design and construction. Based on the mentioned logical diagram and defined security requirements, the project was implemented in three phases: analysis and testing, installation of the safety equipment and system, and commissioning. Developed also was a verification system of all safety conditions, which could be applied to other facilities for production of nitric acid. With the revamped and upgraded interlock alarm safety system, a new and improved safety boundary in the production of nitric acid was set, which created the foundation for further improvement of the production process in terms of improved analysis.

  8. Experiences with the upgraded SKP system during refuelling Paks nuclear power plant

    International Nuclear Information System (INIS)

    Baranyai, A.; Hetzmann, A.

    1997-01-01

    In order to control the neutron flux during the refueling period, new measuring chains were developed and put into operation by the experts of KFKI-RegTron Co., Ltd. and the Paks Nuclear Power Plant with the purpose of partially substituting the original Refuelling Neutron Monitoring system (SKP) of WWER-440 reactor units. The modified monitoring system processes the signals of detectors located in channels outside the core. The outputs of measurement amplifiers equipped with up-to-date electronics fit in the original system perfectly. Use of the out-of-core measuring technique confirmed the preliminary expectations: interference sensitivity has decreased, the neutron/gamma ration increased and refueling time has become shorter by one to one-and-a-half day. The paper details the reasons for upgrading, the essence of utilized solutions and the operational experience. (author)

  9. Initial results of the high resolution edge Thomson scattering upgrade at DIII-D.

    Science.gov (United States)

    Eldon, D; Bray, B D; Deterly, T M; Liu, C; Watkins, M; Groebner, R J; Leonard, A W; Osborne, T H; Snyder, P B; Boivin, R L; Tynan, G R

    2012-10-01

    Validation of models of pedestal structure is an important part of predicting pedestal height and performance in future tokamaks. The Thomson scattering diagnostic at DIII-D has been upgraded in support of validating these models. Spatial and temporal resolution, as well as signal to noise ratio, have all been specifically enhanced in the pedestal region. This region is now diagnosed by 20 view-chords with a spacing of 6 mm and a scattering length of just under 5 mm sampled at a nominal rate of 250 Hz. When mapped to the outboard midplane, this corresponds to ~3 mm spacing. These measurements are being used to test critical gradient models, in which pedestal gradients increase in time until a threshold is reached. This paper will describe the specifications of the upgrade and present initial results of the system.

  10. A summary of methods of predicting reliability life of nuclear equipment with small samples

    International Nuclear Information System (INIS)

    Liao Weixian

    2000-03-01

    Some of nuclear equipment are manufactured in small batch, e.g., 1-3 sets. Their service life may be very difficult to determine experimentally in view of economy and technology. The method combining theoretical analysis with material tests to predict the life of equipment is put forward, based on that equipment consists of parts or elements which are made of different materials. The whole life of an equipment part consists of the crack forming life (i.e., the fatigue life or the damage accumulation life) and the crack extension life. Methods of predicting machine life has systematically summarized with the emphasis on those which use theoretical analysis to substitute large scale prototype experiments. Meanwhile, methods and steps of predicting reliability life have been described by taking into consideration of randomness of various variables and parameters in engineering. Finally, the latest advance and trends of machine life prediction are discussed

  11. Design and construction of a air pollutant gases sampler equipment

    International Nuclear Information System (INIS)

    Gomez S, R.A.; Rodriguez, T.J.

    1996-01-01

    This thesis is about the sketch and construction of an equipment which samples contaminated gases in the air. The topic of this work, is to propose a solution for imported and national equipment. The solution consist on lower prices of imported and national equipment without loosing the accuracy and the precision of those now available. The investigation shows all process to sample gases and theirs measurement for which all the mechanical, electric and electronic equipment, and the necessary software for giving the results in a computerized way were outlined. With this work it was able to succeed in measurements with a national low price, accurate, reliable, programmable, completely automatic and easy to use. This equipment exceed in accuracy the Japanese and the american equipment

  12. Technologies for pre-screening IAEA swipe samples

    International Nuclear Information System (INIS)

    Smith, Nicholas A.; Steeb, Jennifer L.; Lee, Denise L.; Huckabay, Heath A.; Ticknor, Brian W.

    2015-01-01

    During the course of International Atomic Energy Agency (IAEA) inspections, many samples are taken for the purpose of verifying the declared facility activities and identifying any possible undeclared activities. One of these sampling techniques is the environmental swipe sample. Due to the large number of samples collected, and the amount of time that is required to analyze them, prioritizing these swipes in the field or upon receipt at the Network of Analytical Laboratories (NWAL) will allow sensitive or mission-critical analyses to be performed sooner. As a result of this study, technologies were placed into one of three categories: recommended, promising, or not recommended. Both neutron activation analysis (NAA) and X-ray fluorescence (XRF) are recommended for further study and possible field deployment. These techniques performed the best in initial trials for pre-screening and prioritizing IAEA swipes. We learned that for NAA more characterization of cold elements (such as calcium and magnesium) would need to be emphasized, and for XRF it may be appropriate to move towards a benchtop XRF versus a handheld XRF due to the increased range of elements available on benchtop equipment. Promising techniques that will require additional research and development include confocal Raman microscopy, fluorescence microscopy, and infrared (IR) microscopy. These techniques showed substantive responses to uranium compounds, but expensive instrumentation upgrades (confocal Raman) or university engagement (fluorescence microscopy) may be necessary to investigate the utility of the techniques completely. Point-and-shoot (handheld) Raman and attenuated total reflectance–infrared (ATR-IR) measurements are not recommended, as they have not shown enough promise to continue investigations.

  13. Technologies for pre-screening IAEA swipe samples

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Nicholas A. [Argonne National Lab. (ANL), Argonne, IL (United States); Steeb, Jennifer L. [Argonne National Lab. (ANL), Argonne, IL (United States); Lee, Denise L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Huckabay, Heath A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ticknor, Brian W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-11-09

    During the course of International Atomic Energy Agency (IAEA) inspections, many samples are taken for the purpose of verifying the declared facility activities and identifying any possible undeclared activities. One of these sampling techniques is the environmental swipe sample. Due to the large number of samples collected, and the amount of time that is required to analyze them, prioritizing these swipes in the field or upon receipt at the Network of Analytical Laboratories (NWAL) will allow sensitive or mission-critical analyses to be performed sooner. As a result of this study, technologies were placed into one of three categories: recommended, promising, or not recommended. Both neutron activation analysis (NAA) and X-ray fluorescence (XRF) are recommended for further study and possible field deployment. These techniques performed the best in initial trials for pre-screening and prioritizing IAEA swipes. We learned that for NAA more characterization of cold elements (such as calcium and magnesium) would need to be emphasized, and for XRF it may be appropriate to move towards a benchtop XRF versus a handheld XRF due to the increased range of elements available on benchtop equipment. Promising techniques that will require additional research and development include confocal Raman microscopy, fluorescence microscopy, and infrared (IR) microscopy. These techniques showed substantive responses to uranium compounds, but expensive instrumentation upgrades (confocal Raman) or university engagement (fluorescence microscopy) may be necessary to investigate the utility of the techniques completely. Point-and-shoot (handheld) Raman and attenuated total reflectance–infrared (ATR-IR) measurements are not recommended, as they have not shown enough promise to continue investigations.

  14. New drive converter and digital control for the pulsed power supply system of ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Käsemann, Claus-Peter, E-mail: c.p.kaesemann@ipp.mpg.de [Max Planck Institute for Plasma Physics, Boltzmannstraße 2, 85748 Garching (Germany); Jacob, Christian; Nguyen, Hong Ha; Stobbe, Ferdinand; Mayer, Alois [Max Planck Institute for Plasma Physics, Boltzmannstraße 2, 85748 Garching (Germany); Sachs, Edgar; Klein, Reiner [Siemens AG, Industrial Automation Systems, Gleiwitzer Straße 555, 90475 Nürnberg (Germany)

    2015-10-15

    Highlights: • IGBT converter system with integrated control. • Proven technology reduces time and budget. • Flexibility to be integrated into a 35 years old installation. • Stable control algorithms for static and dynamic speed control. • Possibilities for active and reactive power management. - Abstract: Safety and reliability are major issues for the ASDEX Upgrade (AUG) pulsed power supply systems. To avoid long downtimes during an experimental campaign, fault-prone components have to be identified and treated early. This becomes even more important due to the AUG participation in the EUROfusion Medium Sized Tokamak (MST) program. Operating equipment which is up to 40 years old adds additional complications. This contribution describes one such example where a 35 year old flywheel generator at AUG was identified as fault-prone and pre-emptively upgraded with a new drive converter with integrated control. Most challenging was to adapt a modern converter, originally designed for wind turbines, toward a drive system for a flywheel-motor-generator system. To identify the layout of the controller and the control parameters, accurate modeling and comprehensive simulations were performed. This effort paid off during commissioning and measuring results verified the calculated design values. Finally, the system shows good performance during AUG plasma experiments.

  15. A new readout control system for the LHCb upgrade at CERN

    International Nuclear Information System (INIS)

    Alessio, F; Jacobsson, R

    2012-01-01

    The LHCb experiment has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity. The entire readout architecture will be upgraded in order to cope with higher sub-detector occupancies, higher rate and higher network load. In this paper, we describe the architecture, functionalities and a first hardware implementation of a new fast Readout Control system for the LHCb upgrade, which will be entirely based on FPGAs and bi-directional links. We also outline the real-time implementations of the new Readout Control system, together with solutions on how to handle the synchronous distribution of timing and synchronous information to the complex upgraded LHCb readout architecture. One section will also be dedicated to the control and usage of the newly developed CERN GBT chipset to transmit fast and slow control commands to the upgraded LHCb Front-End electronics. At the end, we outline the plans for the deployment of the system in the global LHCb upgrade readout architecture.

  16. Safety system upgrades to a research reactor: A regulatory perspective

    International Nuclear Information System (INIS)

    Lamarre, G.B.; Martin, W.G.

    2003-01-01

    The NRU (National Research Universal) reactor, located at the Chalk River Laboratories of Atomic Energy of Canada Limited (AECL), first achieved criticality November 3, 1957. AECL continues to operate NRU for research to support safety and reliability studies for CANDU reactors and as a major supplier of medical radioisotopes. Following a detailed systematic review and assessment of NRU's design and the condition of its primary systems, AECL formally notified the Canadian Nuclear Safety Commission's (CNSC) predecessor - the Atomic Energy Control Board - in 1992 of its intention to upgrade NRU's safety systems. AECL proposed seven major upgrades to provide improvements in shutdown capability, heat removal, confinement, and reactor monitoring, particularly during and after a seismic event. From a CNSC perspective, these upgrades were necessary to meet modern safety standards. From the start of the upgrades project, the CNSC provided regulatory oversight aimed at ensuring that AECL maintained a structured approach to the upgrades. The elements of the approach include, but are not limited to, the determination of project milestones and target dates; the formalization of the design process and project quality assurance requirements; the requirements for updated documentation, including safety reports, safety notes and commissioning reports; and the approval and authorization process. This paper details, from a regulatory perspective, the structured approach used in approving the design, construction, commissioning and subsequent operation of safety system upgrades for an existing and operating research reactor, including the many challenges faced when attempting to balance the requirements of the upgrades project with AECL's need to keep NRU operating to meet its important research and production objectives. (author)

  17. EN-CV during LS1: upgrade, consolidation, maintenance, operation

    International Nuclear Information System (INIS)

    Nonis, M.

    2012-01-01

    The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a time-frame limited to around twelve months. According to the requests received so far, most projects are related to the upgrade of users' equipment, consolidation work, and the construction of new plants. However, through the experience gained from the first years of the LHC run, some projects are also needed to adapt the existing installations to the new operating parameters. Some of these projects are presented hereafter, outlining the impact that they will have on operational working conditions or risks of breakdown. Among these projects we find: the PM32 raising pumps, the cooling of the CERN Control Center, R2E, the backup cooling towers for ATLAS and cryogenics, a thermosyphon for ATLAS, or new pumps in UWs. Finally, EN-CV activities during LS1 for maintenance, operation, and commissioning will be mentioned since they represent a major workload for the Group

  18. Enhanced E-bed bottoms upgrading using latest catalytic technology

    Energy Technology Data Exchange (ETDEWEB)

    Toshima, H.; Mayo, S.; Sedlacek, Z.; Hughes, T.; De Wind, M. [Albermarle Corp., Amsterdam (Netherlands)

    2009-07-01

    The profitability of refineries depends on heavy oil upgrading in terms of price, conversion, yields and quality of the product. The Ebullated-bed process represents a solution for the effective primary upgrading of heavy oils. Since the 1970s, Albemarle has commercialized several E-bed catalysts to upgrade the bottoms in low sediment and high hydrogenation operations. Although an E-bed is used to maximize the conversion of vacuum residuum (VR), it is often limited by fouling caused by sediment in the product. In order to reduce sedimentation in the product, Albemarle developed an improved E-bed catalytic technology by characterizing the asphaltenes and sediments in order to better understand the oil chemistry and compatibility. The most recent development involves the patented catalyst-staging technology and the improved single catalyst application. Both achieve very low sediment or higher hydrodesulphurization (HDS) and Conradson carbon (CCR) removal for improved bottom upgrading. tabs., figs.

  19. Hybrid biogas upgrading in a two-stage thermophilic reactor

    DEFF Research Database (Denmark)

    Corbellini, Viola; Kougias, Panagiotis; Treu, Laura

    2018-01-01

    The aim of this study is to propose a hybrid biogas upgrading configuration composed of two-stage thermophilic reactors. Hydrogen is directly injected in the first stage reactor. The output gas from the first reactor (in-situ biogas upgrade) is subsequently transferred to a second upflow reactor...... (ex-situ upgrade), in which enriched hydrogenotrophic culture is responsible for the hydrogenation of carbon dioxide to methane. The overall objective of the work was to perform an initial methane enrichment in the in-situ reactor, avoiding deterioration of the process due to elevated pH levels......, and subsequently, to complete the biogas upgrading process in the ex-situ chamber. The methane content in the first stage reactor reached on average 87% and the corresponding value in the second stage was 91%, with a maximum of 95%. A remarkable accumulation of volatile fatty acids was observed in the first...

  20. MAPS development for the ALICE ITS upgrade

    OpenAIRE

    Yang, P; Aglieri, G; Cavicchioli, C; Chalmet, P L; Chanlek, N; Collu, A; Gao, C; Hillemanns, H; Junique, A; Kofarago, M; Keil, M; Kugathasan, T; Kim, D; Kim, J; Lattuca, A

    2015-01-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging senso...

  1. FPGA-based 10-Gbit Ethernet Data Acquisition Interface for the Upgraded Electronics of the ATLAS Liquid Argon Calorimeters

    CERN Document Server

    Grohs, J P; The ATLAS collaboration

    2013-01-01

    The readout of the trigger signals of the ATLAS Liquid Argon (LAr) calorimeters is foreseen to be upgraded in order to prepare for operation during the first high-luminosity phase of the Large Hadron Collider (LHC). Signals with improved spatial granularity are planned to be received from the detector by a Digitial Processing System (DPS) in ATCA technology and will be sent in real-time to the ATLAS trigger system using custom optical links. These data are also sampled by the DPS for monitoring and will be read out by the regular Data Acquisition (DAQ) system of ATLAS which is a network-based PC-farm. The bandwidth between DPS module and DAQ system is expected to be in the order of 10 Gbit/s per module and a standard Ethernet protocol is foreseen to be used. DSP data will be prepared and sent by a modern FPGA either through a switch or directly to a Read-Out System (ROS) PC serving as buffer interface of the ATLAS DAQ. In a prototype setup, an ATCA blade equipped with a Xilinx Virtex-5 FPGA is used to send da...

  2. Seismic assessment and upgrading of Paks nuclear power plant

    International Nuclear Information System (INIS)

    Tamas, K.

    2001-01-01

    A comprehensive programme for seismic assessment and upgrading is currently in progress at Hungary's Paks NPP. The re-evaluation of the site seismic hazard had been already completed. The technology of safe shut down and heat removal is established and the systems and structures relevant for seismic safety are identified. A seismic instrumentation is installed. The pre-earthquake preparedness and post-earthquake actions are elaborated. The methods for seismic capacity assessment are selected. The seismic capacity evaluation and the design of upgrading measures are currently in progress. The easy to perform upgrading covering the most urgent measures had been already performed. (author)

  3. Phase 1 upgrade of the CMS forward hadronic calorimeter

    CERN Document Server

    Noonan, Daniel Christopher

    2017-01-01

    The CMS experiment at the Large Hadron Collider at CERN is upgrading the photo- detection and readout system of the forward hadronic calorimeter. The phase 1 upgrade of the CMS forward calorimeter requires the replacement of the current photomultiplier tubes, as well as the installation of a new front-end readout system. The new photomultiplier tubes contain a thinner window as well as multi-anode readout. The front-end electronics will use the QIE10 ASIC which combines signal digitization with timing information. The major components of the upgrade as well as the current status are described in this paper.

  4. Tracking detectors for the sLHC, the LHC upgrade

    CERN Document Server

    Sadrozinski, Hartmut F W

    2005-01-01

    The plans for an upgrade of the Large Hadron Collider (LHC) to the Super-LHC (sLHC) are reviewed with special consideration of the environment for the inner tracking system. A straw-man detector upgrade for ATLAS is presented, which is motivated by the varying radiation levels as a function of radius, and choices for detector geometries and technologies are proposed, based on the environmental constraints. A few promising technologies for detectors are discussed, both for sensors and for the associated front-end electronics. On-going research in silicon detectors and in ASIC technologies will be crucial for the success of the upgrade.

  5. Constructing an I and C Upgrade Architecture for Korea Standard Nuclear Power Plants

    International Nuclear Information System (INIS)

    Suh, Yong Suk; Hur, Seop; Kim, Dong Hoon; Sung, Chan Ho; Kang, Hyun Tai; Lee, Jae Ki; Cho, Chang Hwan

    2008-01-01

    This paper presents three architectures of the KSNP I and C upgrade. The architectures are constructed with an adoption of PLCs and DCS technology and 3-phase upgrade strategy. The 3-phase upgrade strategy is established to ensure the safety of the upgrade. Based on the architecture, the cabinet configuration is being constructed. From the configuration, it is expected to figure out how to optimize the layout of the cabinets. It is required to study the performance and safety design requirements of the upgrade further

  6. Missile signal processing common computer architecture for rapid technology upgrade

    Science.gov (United States)

    Rabinkin, Daniel V.; Rutledge, Edward; Monticciolo, Paul

    2004-10-01

    Interceptor missiles process IR images to locate an intended target and guide the interceptor towards it. Signal processing requirements have increased as the sensor bandwidth increases and interceptors operate against more sophisticated targets. A typical interceptor signal processing chain is comprised of two parts. Front-end video processing operates on all pixels of the image and performs such operations as non-uniformity correction (NUC), image stabilization, frame integration and detection. Back-end target processing, which tracks and classifies targets detected in the image, performs such algorithms as Kalman tracking, spectral feature extraction and target discrimination. In the past, video processing was implemented using ASIC components or FPGAs because computation requirements exceeded the throughput of general-purpose processors. Target processing was performed using hybrid architectures that included ASICs, DSPs and general-purpose processors. The resulting systems tended to be function-specific, and required custom software development. They were developed using non-integrated toolsets and test equipment was developed along with the processor platform. The lifespan of a system utilizing the signal processing platform often spans decades, while the specialized nature of processor hardware and software makes it difficult and costly to upgrade. As a result, the signal processing systems often run on outdated technology, algorithms are difficult to update, and system effectiveness is impaired by the inability to rapidly respond to new threats. A new design approach is made possible three developments; Moore's Law - driven improvement in computational throughput; a newly introduced vector computing capability in general purpose processors; and a modern set of open interface software standards. Today's multiprocessor commercial-off-the-shelf (COTS) platforms have sufficient throughput to support interceptor signal processing requirements. This application

  7. Upgrading model for the Volleyball teachers

    Directory of Open Access Journals (Sweden)

    Tania Rosa García Hernández

    2017-07-01

    Full Text Available The nowadays society in this XXI century influenced by the progressive development of technologies of information and communication and the knowledge management demands a creative man, transformer of the context in which he takes place, an individual who accepts the challenges of the modern society and that at the same time takes the best of this development. Meeting this goal, the higher education holds the mission of preparing in a continuous and permanent way to the professionals according to the activity they carry out, updating the knowledge in the science they work on. The sport professionals are not the exception in this endeavor due to the formative role they play in the society, it is also caused by the dynamics and the current competitions, the steady changes of the sport rules and the gradual improvement of the athlete’s performance, the venues equipment and the competition itself worldwide. This work is aimed at proposing an upgrading course for the Volleyball professionals in the sport formation school (EIDE Ormani Arenado Llonchimplemented through a strategy based on the difficulties taken from the application of the scientific methods which facilitate a viable, flexible and feasible outcome and with a high social meaning, as it contributes to rise the professional profile of the individuals involved in the study.

  8. Analysis of integrated plant upgrading/life extension programs

    International Nuclear Information System (INIS)

    McCutchan, D.A.; Massie, H.W. Jr.; McFetridge, R.H.

    1988-01-01

    A present-worth generating cost model has been developed and used to evaluate the economic value of integrated plant upgrading life extension project in nuclear power plants. This paper shows that integrated plant upgrading programs can be developed in which a mix of near-term availability, power rating, and heat rate improvements can be obtained in combination with life extension. All significant benefits and costs are evaluated from the viewpoint of the utility, as measured in discounted revenue requirement differentials between alternative plans which are equivalent in system generating capacity. The near-term upgrading benefits are shown to enhance the benefit picture substantially. In some cases the net benefit is positive, even if the actual life extension proves to be less than expected

  9. EBR-II argon cooling system restricted fuel handling I and C upgrade

    International Nuclear Information System (INIS)

    Start, S.E.; Carlson, R.B.; Gehrman, R.L.

    1995-01-01

    The instrumentation and control of the Argon Cooling System (ACS) restricted fuel handling control system at Experimental Breeder Reactor II (EBR-II) is being upgraded from a system comprised of many discrete components and controllers to a computerized system with a graphical user interface (GUI). This paper describes the aspects of the upgrade including reasons for the upgrade, the old control system, upgrade goals, design decisions, philosophies and rationale, and the new control system hardware and software

  10. ATLAS Tracker Upgrade: Silicon Strip Detectors for the sLHC

    CERN Document Server

    Koehler, M; The ATLAS collaboration

    2010-01-01

    To extend the physics potential of the Large Hadron Colider (LHC) at CERN, upgrades of the accelerator complex and the detectors towards the Super-LHC (sLHC) are foreseen. The upgrades, separated in Phase-1 and Phase-2, aim at increasing the luminosity while leaving the energy of the colliding particles (7 TeV per proton beam) unchanged. After the Phase-2 upgrade the instantaneous luminosity will be a factor of 5-10 higher than the design luminosity of the LHC. Due to the increased track rate and extreme radiation levels for the tracking detectors, upgrades of the detectors are necessary. At ATLAS, one of the two general purpose detectors at the LHC, the current inner detector will be replaced by an all-silicon tracker. This article describes the plans for the Phase-2 upgrade of the silicon strip detector of ATLAS. Radiation hard n-in-p silicon detectors with shorter strips than currently installed in ATLAS are planned. Results of measurements with these sensors and plans for module designs will be discussed.

  11. Upgrade of the ATLAS hadronic Tile calorimeter for the High luminosity LHC

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00236332; The ATLAS collaboration

    2016-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS detector at the LHC. It is a sampling calorimeter consisting of alternating thin steel plates and scintillating tiles. Wavelength shifting fibers coupled to the tiles collect the produced light and are read out by photomultiplier tubes. An analog sum of the processed signal of several photomultipliers serves as input to the first level of trigger. Photomultiplier signals are then digitized and stored on detector and are only transferred off detector once the first trigger acceptance has been confirmed. The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade, in 2024, will accommodate the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. All signals will be digitized and then...

  12. Upgrade of the ATLAS hadronic Tile calorimeter for the High luminosity LHC

    CERN Document Server

    Mlynarikova, Michaela; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS detector at the LHC. It is a sampling calorimeter consisting of alternating thin steel plates and scintillating tiles. Wavelength shifting fibers coupled to the tiles collect the produced light and are read out by photomultiplier tubes. Currently, an analog sum of the processed signal of several photomultipliers serves as input to the first level of trigger. Photomultiplier signals are then digitized and stored on detector and are only transferred off detector once the first trigger acceptance has been confirmed. The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade, in 2024, will accommodate the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. All signals will be digitiz...

  13. PEP-II Transverse Feedback Electronics Upgrade

    International Nuclear Information System (INIS)

    Weber, J.; Chin, M.; Doolittle, L.; Akre, R.

    2005-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(R) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design

  14. PEP-II Transverse Feedback Electronics Upgrade

    International Nuclear Information System (INIS)

    Weber, J.M.; Chin, M.J.; Doolittle, L.R.; Akre, R.

    2006-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(reg s ign) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design

  15. PEP-II Transverse Feedback Electronics Upgrade

    CERN Document Server

    Weber, Jonah; Chin, Michael; Doolittle, Lawrence

    2005-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx® ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  16. Take control of upgrading to Snow Leopard

    CERN Document Server

    Kissell, Joe

    2009-01-01

    Installing a major new version of Mac OS X should be exciting and fun, but without proper guidance you may find it nerve-wracking or even risk losing valuable files. Fortunately, many thousands of people have upgraded Mac OS X calmly and successfully with Joe Kissell's previous best-selling Take Control of Upgrading... titles. Joe's friendly, expert steps-developed over innumerable test installations-help you to avoid trouble, understand what's going on when you install Snow Leopard, and easily recover from problem

  17. Front-end electronics for the upgraded GMRT

    International Nuclear Information System (INIS)

    Raut, Anil N; Bhalerao, Vilas; Kumar, A Praveen

    2013-01-01

    This paper first describes briefly the existing front-end receiver in use at the GMRT observatory and then details the ongoing development of next generation receiver systems for the upgraded GMRT. It covers the design of the new, two stage, room temperature, low noise amplifiers with better noise performance and matching, and improved dynamic range that are being implemented for the 130–260 MHz, 250–500 MHz and 550–900 MHz bands of the upgraded GMRT front-end systems.

  18. Mining Upgrades to Reduce Pollution

    Science.gov (United States)

    Settlement with Southern Coal Corporation and 26 affiliates requires the companies to comprehensively upgrade their coal mining and processing operations to prevent polluted wastewater from threatening rivers and streams and communities across Appalachia.

  19. The North West Sturgeon Upgrader: Good Money after Bad?

    Directory of Open Access Journals (Sweden)

    F.L. Ted Morton

    2015-04-01

    Full Text Available The North West Upgrader (NWU project illustrates the risks of government-led efforts to diversify Alberta’s economy. What began as a low-risk, low-cost project to encourage domestic bitumen upgrading has morphed into a multi-billion dollar boondoggle with high risks for Alberta taxpayers. Originally, the Government of Alberta (GOA intended to collect bitumen from producers in lieu of royalties and sell it to provincial upgraders, adding value to the commodity and creating jobs and revenues in Alberta. The private sector was to build and finance the new upgraders, as well as assume the market risks of low margins. The 2008 financial collapse effectively killed that plan. With just one prospect (NWU remaining, the Stelmach government decided to be more than the middleman. The GOA committed to retain ownership of the bitumen up to the point of sale, pay NWU a toll for the processing, and then sell the upgraded product. Under a new “take or pay” arrangement, the GOA assumed liabilities estimated at $19 billion over the 30-year contract with NWU, as well as the market risk of having to sell the upgraded product at below costs. As four different premiers and six different energy ministers cycled through Edmonton, construction costs soared to over $8 billion. The original $6.5 billion cap on the GOA’s liability for construction costs disappeared, and the GOA—and by extension, Alberta taxpayers— are now on the hook for $26 billion in processing payments — the equivalent of $63 per barrel. Falling oil prices are further undermining the prospects for the investment to break even. Written from a rare insider’s perspective, this paper analyzes the lack of effective government oversight and due diligence surrounding the North West Upgrade. Rather than being an exception, NWU fits the larger and longer pattern of failed “forced-growth” diversification initiatives in Alberta and other provinces. Alberta politicians should think long and

  20. ClinicalKey 2.0: Upgrades in a Point-of-Care Search Engine.

    Science.gov (United States)

    Huslig, Mary Ann; Vardell, Emily

    2015-01-01

    ClinicalKey 2.0, launched September 23, 2014, offers a mobile-friendly design with a search history feature for targeting point-of-care resources for health care professionals. Browsing is improved with searchable, filterable listings of sources highlighting new resources. ClinicalKey 2.0 improvements include more than 1,400 new Topic Pages for quick access to point-of-care content. A sample search details some of the upgrades and content options.

  1. Seismic analysis, evaluation and upgrade design for a DOE exhaust stack building

    International Nuclear Information System (INIS)

    Malik, L.E.; Maryak, M.E.

    1991-01-01

    An exhaust stack building of a nuclear reactor facility with complex structural configuration has been analyzed and evaluated and retrofitted for seismic forces. The building was built in the 1950's and had not been designed to resist seismic forces. A rigorous analysis and evaluation program was implemented to minimize costly retrofits required to upgrade the building to resist high seismic forces. Seismic evaluations were performed for the building in its as-is configuration, and as modified for several upgrade schemes. Soil-structure-interaction, basemat flexibility and the influence of the nearby reactor building were considered in rigorous seismic analyses. These analyses and evaluations enabled limited upgrades to qualify the stack building for the seismic forces. Some of the major conclusions of this study are: (1) a phased approach of seismic analyses, utilizing simplified models to evaluate practicable upgrade schemes, and, then incorporating the most suitable scheme in a rigorous model to obtain design forces for upgrades, is an efficient and cost-effective approach for seismic qualification of nuclear facilities to higher seismic criteria; and, (2) finalizing the upgrade of a major nuclear facility is an iterative process, which continues throughout the construction of the upgrades

  2. Hydrothermal Liquefaction and Upgrading of Municipal Wastewater Treatment Plant Sludge: A Preliminary Techno-Economic Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Snowden-Swan, Lesley J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhu, Yunhua [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jones, Susanne B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Elliott, Douglas C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schmidt, Andrew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hallen, Richard T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Billing, Justin M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hart, Todd R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fox, Samuel P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Maupin, Gary D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-06-08

    A preliminary process model and techno-economic analysis (TEA) was completed for fuel produced from hydrothermal liquefaction (HTL) of sludge waste from a municipal wastewater treatment plant (WWTP) and subsequent biocrude upgrading. The model is adapted from previous work by Jones et al. (2014) for algae HTL, using experimental data generated in fiscal year 2015 (FY15) bench-scale HTL testing of sludge waste streams. Testing was performed on sludge samples received from MetroVancouver’s Annacis Island WWTP (Vancouver, B.C.) as part of a collaborative project with the Water Environment and Reuse Foundation (WERF). The full set of sludge HTL testing data from this effort will be documented in a separate report to be issued by WERF. This analysis is based on limited testing data and therefore should be considered preliminary. Future refinements are necessary to improve the robustness of the model, including a cross-check of modeled biocrude components with the experimental GCMS data and investigation of equipment costs most appropriate at the smaller scales used here. Environmental sustainability metrics analysis is also needed to understand the broader impact of this technology pathway. The base case scenario for the analysis consists of 10 HTL plants, each processing 100 dry U.S. ton/day (92.4 ton/day on a dry, ash-free basis) of sludge waste and producing 234 barrel per stream day (BPSD) biocrude, feeding into a centralized biocrude upgrading facility that produces 2,020 barrel per standard day of final fuel. This scale was chosen based upon initial wastewater treatment plant data collected by the resource assessment team from the EPA’s Clean Watersheds Needs Survey database (EPA 2015a) and a rough estimate of what the potential sludge availability might be within a 100-mile radius. In addition, we received valuable feedback from the wastewater treatment industry as part of the WERF collaboration that helped form the basis for the selected HTL and upgrading

  3. PFP Wastewater Sampling Facility

    International Nuclear Information System (INIS)

    Hirzel, D.R.

    1995-01-01

    This test report documents the results obtained while conducting operational testing of the sampling equipment in the 225-WC building, the PFP Wastewater Sampling Facility. The Wastewater Sampling Facility houses equipment to sample and monitor the PFP's liquid effluents before discharging the stream to the 200 Area Treated Effluent Disposal Facility (TEDF). The majority of the streams are not radioactive and discharges from the PFP Heating, Ventilation, and Air Conditioning (HVAC). The streams that might be contaminated are processed through the Low Level Waste Treatment Facility (LLWTF) before discharging to TEDF. The sampling equipment consists of two flow-proportional composite samplers, an ultrasonic flowmeter, pH and conductivity monitors, chart recorder, and associated relays and current isolators to interconnect the equipment to allow proper operation. Data signals from the monitors are received in the 234-5Z Shift Office which contains a chart recorder and alarm annunciator panel. The data signals are also duplicated and sent to the TEDF control room through the Local Control Unit (LCU). Performing the OTP has verified the operability of the PFP wastewater sampling system. This Operability Test Report documents the acceptance of the sampling system for use

  4. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F

    2015-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (P hase - II ) where the pea k luminosity will increase 5 times compared to the design luminosity (10 34 cm −2 s −1 ) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity levelling. This upgrade is expe cted to happen around 202 4 . The TileCal upgrade aims at replacing the majority of the on - and off - detector electronics to the extent that all calorimeter signals will be digitized and sent to the off - detector electronics in the counting room. To achieve th e required reliability, redundancy has been introduced at different levels. Three different options are presently being investiga...

  5. The CMS Tracker upgrade for HL-LHC

    CERN Document Server

    Ahuja, Sudha

    2017-01-01

    The LHC machine is planning an upgrade program which will smoothly bring the luminosity to about 5 $\\times$ $10^{34} $cm$^{-2}$s$^{-1}$ in 2028, to possibly reach an integrated luminosity of 3000 fb$^{-1}$ by the end of 2037. This High Luminosity LHC scenario, HL-LHC, will require a preparation program of the LHC detectors known as Phase-2 upgrade. The current CMS Outer Tracker, already running beyond design specifications, and CMS Phase1 Pixel Detector will not be able to survive HL-LHC radiation conditions and CMS will need completely new devices, in order to fully exploit the high-demanding operating conditions and the delivered luminosity. The new Outer Tracker should have also trigger capabilities. To achieve such goals, R$\\&$D activities are ongoing to explore options both for the Outer Tracker, and for the pixel Inner Tracker. Solutions are being developed that would allow including tracking information at Level-1. The design choices for the Tracker upgrades are discussed along with some highlights...

  6. Control system for Fermilab's low temperature upgrade

    International Nuclear Information System (INIS)

    Norris, B.L.

    1996-09-01

    Fermilab recently upgraded the Tevatron Cryogenic Systems to allow for lower temperature operation. This Lower Temperature Upgrade grew out of a desire to increase the Colliding Beam Physics energy from 900 GeV to 1000 GeV. A key element in achieving this goal is the new cryogenic control system designed at Fermilab and installed in 24 satellite refrigerators and 8 compressor buildings. The cryogenic improvements and addition hardware like cold compressors exceeded the capability of the original distributed controls package. The new distributed controls package uses a Multibus II platform and Intel's 80386 microprocessor. Token Ring is used as the link to the systems 6 primary crate locations with Arcnet used as the connection to the systems numerous I/O crates. I/0 capabilities are double the capabilities of the original system. Software has also been upgraded with the introduction of more flexible control loop strategies and Finite State Machines used for automatic sequential control, like quench recovery or cold compressor pump down

  7. Interactive learning for upgrading and growth: Case of Indonesian fishery firms

    Directory of Open Access Journals (Sweden)

    Erman Aminullah

    2017-07-01

    Full Text Available This paper intends to reveal the interactive learning for upgrading and growth in Indonesian fishery firms. The main question is how learning and innovation have occurred in Indonesian fishery firms. The study was conducted in two categories of fishery firms: fish processing and aquaculture (shrimp. The interfirm interactions contain knowledge flows and feedback in local production network involving local suppliers and foreign buyers. The study found that the model of interactive learning for upgrading and growth work as a coupling of three loops: the upgrading capability, the growth formation, and limiting elements. The upgrading capability is subject to growth formation, which is determined by limiting elements.  The limiting elements will control the quantity and quality of materials supply that affect inter-firm interaction. The model suggests that the dynamics of upgrading and growth through interactive leraning will continue in a stable manner by easing the constraints of limiting elements through: combating illegal fishing, encouraging interaction with universities, shifting to higher added value products, institutional support for global trading,  preventing shrimp disease, providing infrastructure, business facilities, and regulation information.   Key words: upgrading, growth, limiting elements, knowledge flows, production network, global market.

  8. Upgrading Atucha 1 nuclear power plant. Regulatory perspective

    International Nuclear Information System (INIS)

    Caruso, G.

    1998-01-01

    Atucha 1 nuclear power plant has unique design and its commercial operation started in 1974. The upgrading decisions, the basis for an upgrading program and its status of implementation are presented. Regulatory decisions derived from the performance-based approach have the advantage that they enable balancing of the overall plant risk and identifying at different plant levels the areas where improvements are necessary. (author)

  9. B-physics studies for HL-LHC ATLAS upgrade

    CERN Document Server

    Jakoubek, Tomas; The ATLAS collaboration

    2017-01-01

    Simulation studies were made to estimate ATLAS HL-LHC upgrade performance for B-physics. In particular, the decay of $B_s^0 \\to J/\\psi\\phi$ is studied in order to measures the $CP$ violating mixing phase and the width difference between the $B_s^0$ eigenstates. The increased sensitivity is related mainly to the improved decay time resolution obtained with the upgraded ITk inner tracking detector.

  10. Shielding assessment of the ETRR-1 Reactor Under power upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Ahmad, E E [Reactor Department, Nuclear Research Center, Atomic Energy Authority, Cairo (Egypt)

    1997-12-31

    The assessment of existing shielding of the ETRR-1 reactor in case of power upgrading is presented and discussed. It was carried out using both the present EK-10 type fuel elements and some other types of fuel elements with different enrichments. The shielding requirements for the ETRR-1 when power is upgraded are also discussed. The optimization curves between the upgraded reactor power and the shield thickness are presented. The calculation have been made using the ANISN code with the DLC-75 data library. The results showed that the present shield necessitates an additional layer of steel with thickness of 10.20 and 25 cm. When its power is upgraded to 3, 6 and 10 MWt in order to cutoff all neutron energy groups to be adequately safe under normal operating conditions. 4 figs.

  11. Probabilistic risk assessment of earthquakes at the Rocky Flats Plant and subsequent upgrade to reduce risk

    International Nuclear Information System (INIS)

    Day, S.A.

    1989-01-01

    An analysis to determine the risk associated with earthquakes at the Rocky Flats Plant was performed. Seismic analyses and structural evaluations were used to postulate building and equipment damage and radiological releases to the environment from various magnitudes of earthquakes. Dispersion modeling and dose assessment to the public were then calculated. The frequency of occurrence of various magnitudes of earthquakes were determined from the Department of Energy natural Phenomena Hazards Modeling Project. Risk to the public was probabilistically assessed for each magnitude of earthquake and for overall seismic risk. Based on the results of this Probabilistic Risk Assessment and a cost/benefit analysis, seismic upgrades are being implemented for several plutonium-handling facilities for the purpose of risk reduction

  12. Expression of Interest for a Phase-II LHCb Upgrade: Opportunities in flavour physics, and beyond, in the HL-LHC era

    CERN Document Server

    Aaij, Roel; Adinolfi, Marco; Ajaltouni, Ziad; Akar, Simon; Albrecht, Johannes; Alessio, Federico; Alexander, Michael; Ali, Suvayu; Alkhazov, Georgy; Alvarez Cartelle, Paula; Alves Jr, Antonio Augusto; Amato, Sandra; Amerio, Silvia; Amhis, Yasmine; An, Liupan; Anderlini, Lucio; Andreassi, Guido; Andreotti, Mirco; Andrews, Jason; Anelli, Mario; Appleby, Robert; Archilli, Flavio; d'Argent, Philippe; Arnau Romeu, Joan; Artamonov, Alexander; Artuso, Marina; Aslanides, Elie; Auriemma, Giulio; Baalouch, Marouen; Babuschkin, Igor; Bachmann, Sebastian; Back, John; Badalov, Alexey; Baesso, Clarissa; Baker, Sophie; Balagura, Vladislav; Baldini, Wander; Balla, Alessandro; Baranov, Alexander; Barlow, Roger; Barschel, Colin; Barsuk, Sergey; Barter, William; Baryshnikov, Fedor; Baszczyk, Mateusz; Batozskaya, Varvara; Batsukh, Baasansuren; Battista, Vincenzo; Bay, Aurelio; Beaucourt, Leo; Beddow, John; Bedeschi, Franco; Bediaga, Ignacio; Beiter, Andrew; Bel, Lennaert; Bellee, Violaine; Belloli, Nicoletta; Belous, Konstantin; Belyaev, Ivan; Ben-Haim, Eli; Bencivenni, Giovanni; Benson, Sean; Beranek, Sarah; Berezhnoy, Alexander; Bernet, Roland; Bertolin, Alessandro; Betancourt, Christopher; Betti, Federico; Bettler, Marc-Olivier; van Beuzekom, Martinus; Bezshyiko, Iaroslava; Bifani, Simone; Billoir, Pierre; Birnkraut, Alex; Bitadze, Alexander; Bizzeti, Andrea; Blake, Thomas; Blanc, Frederic; Blouw, Johan; Blusk, Steven; Bocci, Valerio; Boettcher, Thomas; Bondar, Alexander; Bondar, Nikolay; Bonivento, Walter; Bordyuzhin, Igor; Borgheresi, Alessio; Borghi, Silvia; Borisyak, Maxim; Borsato, Martino; Bossu, Francesco; Boubdir, Meriem; Bowcock, Themistocles; Bowen, Espen Eie; Bozzi, Concezio; Braun, Svende; Britton, Thomas; Brodzicka, Jolanta; Brundu, Davide; Buchanan, Emma; Burr, Christopher; Bursche, Albert; Buytaert, Jan; Cadeddu, Sandro; Calabrese, Roberto; Calvi, Marta; Calvo Gomez, Miriam; Camboni, Alessandro; Campana, Pierluigi; Campora Perez, Daniel Hugo; Capriotti, Lorenzo; Carbone, Angelo; Carboni, Giovanni; Cardinale, Roberta; Cardini, Alessandro; Carletti, Maurizio; Carniti, Paolo; Carson, Laurence; Carvalho Akiba, Kazuyoshi; Casse, Gianluigi; Cassina, Lorenzo; Castillo Garcia, Lucia; Casu, Luigi; Cattaneo, Marco; Cavallero, Giovanni; Cenci, Riccardo; Chamont, David; Charles, Matthew; Charpentier, Philippe; Chatzikonstantinidis, Georgios; Chefdeville, Maximilien; Chen, Shanzhen; Cheung, Shu-Faye; Chobanova, Veronika; Chrzaszcz, Marcin; Chubykin, Alexsei; Ciambrone, Paolo; Cid Vidal, Xabier; Ciezarek, Gregory; Citterio, Mauro; Clarke, Peter; Clemencic, Marco; Cliff, Harry; Closier, Joel; Coco, Victor; Coelli, Simone; Cogan, Julien; Cogneras, Eric; Cogoni, Violetta; Cojocariu, Lucian; Collins, Paula; Comerma-Montells, Albert; Contu, Andrea; Cook, Andrew; Coombs, George; Coquereau, Samuel; Corti, Gloria; Corvo, Marco; Costa Sobral, Cayo Mar; Couturier, Benjamin; Cowan, Greig; Craik, Daniel Charles; Crocombe, Andrew; Cruz Torres, Melissa Maria; Cunliffe, Samuel; Currie, Robert; D'Ambrosio, Carmelo; Da Cunha Marinho, Franciole; Dall'Occo, Elena; Dalseno, Jeremy; David, Pieter; Davis, Adam; De Bruyn, Kristof; De Capua, Stefano; De Cian, Michel; De Miranda, Jussara; De Paula, Leandro; De Serio, Marilisa; De Simone, Patrizia; Dean, Cameron Thomas; Decamp, Daniel; Deckenhoff, Mirko; Del Buono, Luigi; Demmer, Moritz; Dendek, Adam; Derkach, Denis; Deschamps, Olivier; Dettori, Francesco; Dey, Biplab; Di Canto, Angelo; Di Nezza, Pasquale; Dijkstra, Hans; Dordei, Francesca; Dorigo, Mirco; Dosil Su{á}rez, Alvaro; Dovbnya, Anatoliy; Dreimanis, Karlis; Dufour, Laurent; Dujany, Giulio; Dungs, Kevin; Durante, Paolo; Dzhelyadin, Rustem; Dziurda, Agnieszka; Dzyuba, Alexey; D{é}l{é}age, Nicolas; Easo, Sajan; Ebert, Marcus; Egede, Ulrik; Egorychev, Victor; Eidelman, Semen; Eisenhardt, Stephan; Eitschberger, Ulrich; Ekelhof, Robert; Eklund, Lars; Ely, Scott; Esen, Sevda; Evans, Hannah Mary; Evans, Timothy; Falabella, Antonio; Farley, Nathanael; Farry, Stephen; Fay, Robert; Fazzini, Davide; Felici, Giulietto; Ferguson, Dianne; Fernandez, Gerard; Fernandez Prieto, Antonio; Ferrari, Fabio; Ferreira Rodrigues, Fernando; Ferro-Luzzi, Massimiliano; Filippov, Sergey; Fini, Rosa Anna; Fiore, Marco; Fiorini, Massimiliano; Firlej, Miroslaw; Fitzpatrick, Conor; Fiutowski, Tomasz; Fleuret, Frederic; Fohl, Klaus; Fontana, Marianna; Fontanelli, Flavio; Forshaw, Dean Charles; Forty, Roger; Franco Lima, Vinicius; Frank, Markus; Frei, Christoph; Fresch, Paolo; Fu, Jinlin; Funk, Wolfgang; Furfaro, Emiliano; F{ä}rber, Christian; Gallas Torreira, Abraham; Galli, Domenico; Gallorini, Stefano; Gambetta, Silvia; Gandelman, Miriam; Gandini, Paolo; Gao, Yuanning; Garcia Martin, Luis Miguel; Garc{í}a Pardi{ñ}as, Juli{á}n; Garra Tico, Jordi; Garrido, Lluis; Garsed, Philip John; Gascon, David; Gaspar, Clara; Gatta, Maurizio; Gavardi, Laura; Gazzoni, Giulio; Gerick, David; Gersabeck, Evelina; Gersabeck, Marco; Gershon, Timothy; Ghez, Philippe; Gian{ì}, Sebastiana; Gibson, Valerie; Girard, Olivier G{ö}ran; Giubega, Lavinia-Helena; Gizdov, Konstantin; Gligorov, Vladimir; Golubkov, Dmitry; Golutvin, Andrey; Gomes, Alvaro; Gorelov, Igor Vladimirovich; Gotti, Claudio; Govorkova, Ekaterina; Graciani Diaz, Ricardo; Granado Cardoso, Luis Alberto; Graug{é}s, Eugeni; Graverini, Elena; Graziani, Giacomo; Grecu, Alexandru; Greim, Roman; Griffith, Peter; Grillo, Lucia; Gruberg Cazon, Barak Raimond; Gr{ü}nberg, Oliver; Gushchin, Evgeny; Guz, Yury; Gys, Thierry; G{ö}bel, Carla; Hadavizadeh, Thomas; Hadjivasiliou, Christos; Haefeli, Guido; Haen, Christophe; Haines, Susan; Hamilton, Brian; Han, Xiaoxue; Hansmann-Menzemer, Stephanie; Harnew, Neville; Harnew, Samuel; Harrison, Jonathan; Hatch, Mark; He, Jibo; Head, Timothy; Heister, Arno; Hennessy, Karol; Henrard, Pierre; Henry, Louis; van Herwijnen, Eric; Heß, Miriam; Hicheur, Adl{è}ne; Hill, Donal; Hombach, Christoph; Hopchev, P H; Huard, Zachary; Hulsbergen, Wouter; Humair, Thibaud; Hushchyn, Mikhail; Hutchcroft, David; Idzik, Marek; Ilten, Philip; Jacobsson, Richard; Jalocha, Pawel; Jans, Eddy; Jawahery, Abolhassan; Jiang, Feng; John, Malcolm; Johnson, Daniel; Jones, Christopher; Joram, Christian; Jost, Beat; Jurik, Nathan; Kandybei, Sergii; Karacson, Matthias; Kariuki, James Mwangi; Karodia, Sarah; Kecke, Matthieu; Kelsey, Matthew; Kenzie, Matthew; Ketel, Tjeerd; Khairullin, Egor; Khanji, Basem; Khurewathanakul, Chitsanu; Kirn, Thomas; Klaver, Suzanne; Klimaszewski, Konrad; Klimkovich, Tatsiana; Koliiev, Serhii; Kolpin, Michael; Komarov, Ilya; Koppenburg, Patrick; Kosmyntseva, Alena; Kotriakhova, Sofia; Kozachuk, Anastasiia; Kozeiha, Mohamad; Kravchuk, Leonid; Kreplin, Katharina; Kreps, Michal; Krokovny, Pavel; Kruse, Florian; Krzemien, Wojciech; Kucewicz, Wojciech; Kucharczyk, Marcin; Kudryavtsev, Vasily; Kuonen, Axel Kevin; Kurek, Krzysztof; Kvaratskheliya, Tengiz; Lacarrere, Daniel; Lafferty, George; Lai, Adriano; Langenbruch, Christoph; Latham, Thomas; Lazzeroni, Cristina; Le Gac, Renaud; van Leerdam, Jeroen; Leflat, Alexander; Lefran{ç}ois, Jacques; Lef{è}vre, Regis; Lemaitre, Florian; Lemos Cid, Edgar; Leroy, Olivier; Lesiak, Tadeusz; Leverington, Blake; Li, Tenglin; Li, Yiming; Li, Zhuoming; Likhomanenko, Tatiana; Lindner, Rolf; Lionetto, Federica; Liu, Xuesong; Loh, David; Loi, Angelo; Longstaff, Iain; Lopes, Jose; Lucchesi, Donatella; Lucio Martinez, Miriam; Luo, Haofei; Lupato, Anna; Luppi, Eleonora; Lupton, Oliver; Lusiani, Alberto; Lyu, Xiao-Rui; Machefert, Frederic; Maciuc, Florin; Maev, Oleg; Maguire, Kevin; Malde, Sneha; Malinin, Alexander; Maltsev, Timofei; Manca, Giulia; Mancinelli, Giampiero; Manning, Peter Michael; Maratas, Jan; Marchand, Jean Fran{ç}ois; Marconi, Umberto; Marin Benito, Carla; Marinangeli, Matthieu; Marino, Pietro; Marks, J{ö}rg; Marras, Davide; Martellotti, Giuseppe; Martin, Morgan; Martinelli, Maurizio; Martinez Santos, Diego; Martinez Vidal, Fernando; Martins Tostes, Danielle; Massacrier, Laure Marie; Massafferri, Andr{é}; Matev, Rosen; Mathad, Abhijit; Mathe, Zoltan; Matteuzzi, Clara; Mauri, Andrea; Maurice, Emilie; Maurin, Brice; Mazurov, Alexander; McCann, Michael; McNab, Andrew; McNulty, Ronan; Meadows, Brian; Meier, Frank; Melnychuk, Dmytro; Merk, Marcel; Merli, Andrea; Michielin, Emanuele; Milanes, Diego Alejandro; Minard, Marie-Noelle; Mitzel, Dominik Stefan; Mogini, Andrea; Molina Rodriguez, Josue; Monroy, Igancio Alberto; Monteil, Stephane; Morandin, Mauro; Morawski, Piotr; Morello, Michael Joseph; Morgunova, Olga; Moron, Jakub; Morris, Adam Benjamin; Mountain, Raymond; Muheim, Franz; Mulder, Mick; Mussini, Manuel; M{ü}ller, Dominik; M{ü}ller, Janine; M{ü}ller, Katharina; M{ü}ller, Vanessa; Naik, Paras; Nakada, Tatsuya; Nandakumar, Raja; Nandi, Anita; Nasteva, Irina; Needham, Matthew; Neri, Nicola; Neubert, Sebastian; Neufeld, Niko; Neuner, Max; Nguyen, Thi Dung; Nguyen-Mau, Chung; Nieswand, Simon; Niet, Ramon; Nikitin, Nikolay; Nikodem, Thomas; Nogay, Alla; Novoselov, Alexey; O'Hanlon, Daniel Patrick; Oblakowska-Mucha, Agnieszka; Obraztsov, Vladimir; Ogilvy, Stephen; Oldeman, Rudolf; Onderwater, Gerco; Otalora Goicochea, Juan Martin; Otto, Adam; Owen, Patrick; Oyanguren, Maria Aranzazu; Pais, Preema Rennee; Palano, Antimo; Palutan, Matteo; Papanestis, Antonios; Pappagallo, Marco; Pappalardo, Luciano; Pappenheimer, Cheryl; Parker, William; Parkes, Christopher; Passaleva, Giovanni; Pastore, Alessandra; Patel, Mitesh; Patrignani, Claudia; Pearce, Alex; Pellegrino, Antonio; Penso, Gianni; Pepe Altarelli, Monica; Perazzini, Stefano; Perret, Pascal; Pescatore, Luca; Petridis, Konstantinos; Petrolini, Alessandro; Petrov, Aleksandr; Petruzzo, Marco; Picatoste Olloqui, Eduardo; Pietrzyk, Boleslaw; Pikies, Malgorzata; Pinci, Davide; Pistone, Alessandro; Piucci, Alessio; Placinta, Vlad-Mihai; Playfer, Stephen; Plo Casasus, Maximo; Poikela, Tuomas; Polci, Francesco; Poli Lener, Marco; Poluektov, Anton; Polyakov, Ivan; Polycarpo, Erica; Pomery, Gabriela Johanna; Ponce, Sebastien; Popov, Alexander; Popov, Dmitry; Popovici, Bogdan; Poslavskii, Stanislav; Potterat, C{é}dric; Price, Eugenia; Prisciandaro, Jessica; Prouve, Claire; Pugatch, Valery; Puig Navarro, Albert; Punzi, Giovanni; Qian, Chen; Qian, Wenbin; Quagliani, Renato; Rachwal, Bartolomiej; Rademacker, Jonas; Rama, Matteo; Ramos Pernas, Miguel; Rangel, Murilo; Raniuk, Iurii; Ratnikov, Fedor; Raven, Gerhard; Redi, Federico; Reichert, Stefanie; dos Reis, Alberto; Remon Alepuz, Clara; Renaudin, Victor; Ricciardi, Stefania; Richards, Sophie; Rihl, Mariana; Rinnert, Kurt; Rives Molina, Vicente; Robbe, Patrick; Rodrigues, Ana Barbara; Rodrigues, Eduardo; Rodriguez Lopez, Jairo Alexis; Rodriguez Perez, Pablo; Rogozhnikov, Alexey; Roiser, Stefan; Rollings, Alexandra Paige; Romanovskiy, Vladimir; Romero Vidal, Antonio; Ronayne, John William; Rotondo, Marcello; Rudolph, Matthew Scott; Ruf, Thomas; Ruiz Valls, Pablo; Saborido Silva, Juan Jose; Sadykhov, Elnur; Sagidova, Naylya; Saitta, Biagio; Salustino Guimaraes, Valdir; Sanchez Gonzalo, David; Sanchez Mayordomo, Carlos; Sanmartin Sedes, Brais; Santacesaria, Roberta; Santamarina Rios, Cibran; Santimaria, Marco; Santovetti, Emanuele; Saputi, Alessandro; Sarti, Alessio; Satriano, Celestina; Satta, Alessia; Saunders, Daniel Martin; Savrina, Darya; Schael, Stefan; Schellenberg, Margarete; Schiller, Manuel; Schindler, Heinrich; Schlupp, Maximilian; Schmelling, Michael; Schmelzer, Timon; Schmidt, Burkhard; Schneider, Olivier; Schopper, Andreas; Schreiner, HF; Schubert, Konstantin; Schubiger, Maxime; Schune, Marie Helene; Schwemmer, Rainer; Sciascia, Barbara; Sciubba, Adalberto; Semennikov, Alexander; Sergi, Antonino; Serra, Nicola; Serrano, Justine; Sestini, Lorenzo; Seyfert, Paul; Shapkin, Mikhail; Shapoval, Illya; Shcheglov, Yury; Shears, Tara; Shekhtman, Lev; Shevchenko, Vladimir; Siddi, Benedetto Gianluca; Silva Coutinho, Rafael; Silva de Oliveira, Luiz Gustavo; Simi, Gabriele; Simone, Saverio; Sirendi, Marek; Skidmore, Nicola; Skwarnicki, Tomasz; Smith, Eluned; Smith, Iwan Thomas; Smith, Jackson; Smith, Mark; Soares Lavra, Lais; Sokoloff, Michael; Soler, Paul; Souza De Paula, Bruno; Spaan, Bernhard; Spradlin, Patrick; Sridharan, Srikanth; Stagni, Federico; Stahl, Marian; Stahl, Sascha; Stefko, Pavol; Stefkova, Slavomira; Steinkamp, Olaf; Stemmle, Simon; Stenyakin, Oleg; Stevens, Holger; Stoica, Sabin; Stone, Sheldon; Storaci, Barbara; Stracka, Simone; Stramaglia, Maria Elena; Straticiuc, Mihai; Straumann, Ulrich; Sun, Liang; Sutcliffe, William; Swientek, Krzysztof; Syropoulos, Vasileios; Szczekowski, Marek; Szumlak, Tomasz; T'Jampens, Stephane; Tayduganov, Andrey; Tekampe, Tobias; Tellarini, Giulia; Teubert, Frederic; Thomas, Eric; van Tilburg, Jeroen; Tilley, Matthew James; Tisserand, Vincent; Tobin, Mark; Tolk, Siim; Tomassetti, Luca; Tonelli, Diego; Topp-Joergensen, Stig; Toriello, Francis; Tourinho Jadallah Aoude, Rafael; Tournefier, Edwige; Tourneur, Stephane; Trabelsi, Karim; Traill, Murdo; Tran, Minh T{â}m; Tresch, Marco; Trisovic, Ana; Tsaregorodtsev, Andrei; Tsopelas, Panagiotis; Tully, Alison; Tuning, Niels; Ukleja, Artur; Ustyuzhanin, Andrey; Uwer, Ulrich; Vacca, Claudia; Vagnoni, Vincenzo; Valassi, Andrea; Valat, Sebastien; Valenti, Giovanni; Van Dijk, Maarten; Vazquez Gomez, Ricardo; Vazquez Regueiro, Pablo; Vecchi, Stefania; van Veghel, Maarten; Velthuis, Jaap; Veltri, Michele; Veneziano, Giovanni; Venkateswaran, Aravindhan; Verlage, Tobias Anton; Vernet, Maxime; Vesterinen, Mika; Viana Barbosa, Joao Vitor; Viaud, Benoit; Vieira, Daniel; Vieites Diaz, Maria; Viemann, Harald; Vilasis-Cardona, Xavier; Vitti, Marcela; Volkov, Vladimir; Vollhardt, Achim; Voneki, Balazs; Vorobyev, Alexey; Vorobyev, Vitaly; Voß, Christian; de Vries, Jacco; V{á}zquez Sierra, Carlos; Waldi, Roland; Wallace, Charlotte; Wallace, Ronan; Walsh, John; Wang, Jianchun; Ward, David; Wark, Heather Mckenzie; Watson, Nigel; Websdale, David; Weiden, Andreas; Whitehead, Mark; Wicht, Jean; Wilkinson, Guy; Wilkinson, Michael; Williams, Mark Richard James; Williams, Matthew; Williams, Mike; Williams, Timothy; Wilson, Fergus; Wimberley, Jack; Winn, Michael Andreas; Wishahi, Julian; Wislicki, Wojciech; Witek, Mariusz; Wormser, Guy; Wotton, Stephen; Wraight, Kenneth; Wyllie, Kenneth; Xie, Yuehong; Xing, Zhou; Xu, Zhirui; Yang, Zhenwei; Yang, Zishuo; Yao, Yuezhe; Yin, Hang; Yu, Jiesheng; Yuan, Xuhao; Yushchenko, Oleg; Zarebski, Kristian Alexander; Zavertyaev, Mikhail; Zhang, Liming; Zhang, Yanxi; Zhelezov, Alexey; Zheng, Yangheng; Zhu, Xianglei; Zhukov, Valery; Zucchelli, Stefano; CERN. Geneva. The LHC experiments Committee; LHCC

    2017-01-01

    A Phase-II Upgrade is proposed for the LHCb experiment in order to take full advantage of the flavour-physics opportunities at the HL-LHC, and other topics that can be studied with a forward spectrometer. This Upgrade, which will be installed in Long Shutdown 4 of the LHC (2030), will build on the strengths of the current experiment and the Phase-I Upgrade, but will consist of re-designed sub-systems that can operate at a luminosity of $2 \\times 10^{34}\\,{\\rm cm}^{-2} s^{-1}$, ten times that of the Phase-I Upgrade detector. New and improved detector components will increase the intrinsic performance of the experiment in certain key areas. In particular the installation of a tungsten sampling electromagnetic calorimeter will widen LHCb's capabilities for decays involving $\\pi^0$ and $\\eta$ mesons, electrons, and photons from loop-level penguin processes. The physics motivation is presented, and the prospects for operating the LHCb Interaction Point at high luminosity are assessed. The challenges for the detect...

  13. CMS Calorimeter Trigger Phase I upgrade

    International Nuclear Information System (INIS)

    Klabbers, P; Gorski, T; Bachtis, M; Dasu, S; Fobes, R; Grothe, M; Ross, I; Smith, W H; Compton, K; Farmahini-Farahani, A; Gregerson, A; Seemuth, D; Schulte, M

    2012-01-01

    We present a design for the Phase-1 upgrade of the Compact Muon Solenoid (CMS) calorimeter trigger system composed of FPGAs and Multi-GBit/sec links that adhere to the μTCA crate Telecom standard. The upgrade calorimeter trigger will implement algorithms that create collections of isolated and non-isolated electromagnetic objects, isolated and non-isolated tau objects and jet objects. The algorithms are organized in several steps with progressive data reduction. These include a particle cluster finder that reconstructs overlapping clusters of 2x2 calorimeter towers and applies electron identification, a cluster overlap filter, particle isolation determination, jet reconstruction, particle separation and sorting.

  14. Upgrade of the synchronous data management system of the EAST poloidal field power supply

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Lili; Huang, Liansheng, E-mail: huangls@ipp.ac.cn; Fu, Peng; Gao, Ge; He, Shiying

    2016-11-15

    Highlights: • The upgraded synchronous data management system of EAST poloidal field power supply supports long-pulse data storage. • Slice storage mechanism on MDSplus has been adopted for quasi real-time data storage. • The state machine has been adopted for managing the system sequencer. • IEEE-1588 protocol via Ethernet for the synchronization of clock signal was detailed described. - Abstract: Poloidal field (PF) power supply is an important subsystem of the Experimental Advanced Superconducting Tokamak (EAST). The upgrade of the PF control system of EAST is a great improvement over the original data management system which could not meet the requirements necessary for experiments on synchronization, modularity and sampling rate. In order to better analyze the power operation performance, the Synchronization Data Management System (SDMS) needs to be upgraded as well. This upgrade is based on distributed data acquisition and an MDSPLUS database. It consists of three data acquisition nodes synchronized by an reference clock from the EAST central timing system that also provides the start trigger of the EAST pulse. After being processed by a signal conditioning unit, experimental signals are digitized and written into the database in MDSPLUS format. Multi-channel, multi-tasking and continuous data storage have been achieved by using multi-threading technology on a Linux operation system. The SDMS has been used on the server in PF control system for the entire 2015 EAST campaign. The SDMS has had good performance during experiments and convenient human-machine interface to satisfy the requirements of all the experiments.

  15. Upgrade of the synchronous data management system of the EAST poloidal field power supply

    International Nuclear Information System (INIS)

    Zhu, Lili; Huang, Liansheng; Fu, Peng; Gao, Ge; He, Shiying

    2016-01-01

    Highlights: • The upgraded synchronous data management system of EAST poloidal field power supply supports long-pulse data storage. • Slice storage mechanism on MDSplus has been adopted for quasi real-time data storage. • The state machine has been adopted for managing the system sequencer. • IEEE-1588 protocol via Ethernet for the synchronization of clock signal was detailed described. - Abstract: Poloidal field (PF) power supply is an important subsystem of the Experimental Advanced Superconducting Tokamak (EAST). The upgrade of the PF control system of EAST is a great improvement over the original data management system which could not meet the requirements necessary for experiments on synchronization, modularity and sampling rate. In order to better analyze the power operation performance, the Synchronization Data Management System (SDMS) needs to be upgraded as well. This upgrade is based on distributed data acquisition and an MDSPLUS database. It consists of three data acquisition nodes synchronized by an reference clock from the EAST central timing system that also provides the start trigger of the EAST pulse. After being processed by a signal conditioning unit, experimental signals are digitized and written into the database in MDSPLUS format. Multi-channel, multi-tasking and continuous data storage have been achieved by using multi-threading technology on a Linux operation system. The SDMS has been used on the server in PF control system for the entire 2015 EAST campaign. The SDMS has had good performance during experiments and convenient human-machine interface to satisfy the requirements of all the experiments.

  16. Pakistan upgrades PARR-1 and converts to LEU

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    The Pakistan Research Reactor, PARR-1, is a 5MW swimming pool type reactor originally designed to use MTR type fuel elements fabricated from uranium enriched to more than 90%. After about 24 years of satisfactory operation it is now planned to convert the reactor to use low enriched (20%) uranium fuel. The opportunity will also be taken to upgrade the reactor power to about 9MW. This power upgrading will meet the demand for higher neutron fluxes for experimental and radioisotope production as well as compensating for the neutron flux penalty arising from conversion from high enriched to low enriched fuel. During the process of conversion and upgrading it is also proposed to renovate existing services and associated systems and to add certain new safety related engineering. (author)

  17. Upgrade of the ATLAS Tile Calorimeter for the High Luminosity LHC

    CERN Document Server

    Tang, Fukun; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter of ATLAS covering the central region of the ATLAS experiment. TileCal will undergo a major replacement of its on- and off-detector electronics in 2024 for the high luminosity program of the LHC. The calorimeter signals will be digitized and sent directly to the off-detector electronics, where the signals are reconstructed and transmitted to the first level of trigger at a rate of 40 MHz. This will provide a better precision of the calorimeter signals used by the trigger system and will allow the development of more complex trigger algorithms. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies are being employed to determine which option will be selected. The off-detector electronics are based on the Advanced Telecommunications Computing Architecture (ATCA) standard and are equipped with high performance optical connectors. The system is designed to operate in a high radiation envi...

  18. Upgrade of the ATLAS Tile Calorimeter for the High Luminosity LHC

    CERN Document Server

    Tang, Fukun; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter of ATLAS cover-ing the central region of the ATLAS experiment. TileCal will undergo a major replacement of its on- and off-detector electronics in 2024 for the high luminosity program of the LHC. The calorimeter signals will be digitized and sent directly to the off-detector electronics, where the signals are reconstructed and shipped to the first level of trigger at a rate of 40 MHz. This will provide a better precision of the calorimeter signals used by the trigger system and will allow the development of more complex trigger algorithms. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies are being employed to determine which option will be selected. The off-detector electronic is based on the Advanced Telecommunications Computing Architecture (ATCA) standard and is equipped with high performance optical connectors. The system is designed to operate in a high radiation environmen...

  19. Orphee reactor experimental equipment

    International Nuclear Information System (INIS)

    1987-01-01

    Experimental equipment around the ORPHEE reactor is presented. The neutron source; and the spectrometers and sample environment (inelastic and quasi-elastic scattering, elastic scattering, spread scattering, small angle scattering) are described. An experiment proposal and reports guide is supplied [fr

  20. Human factors aspects of the major upgrade to control systems at the Los Alamos National Laboratory Plutonium Facility

    International Nuclear Information System (INIS)

    Higgins, J.; Pope, N.

    1997-01-01

    The Plutonium Facility (TA-55) at Los Alamos National Laboratory (LANL) has been in operation for over 15 years. It handles projects such as: stockpile maintenance, surveillance, and dismantlement; pit rebuild; plutonium power source fabrication for long duration spacecraft missions (e.g., Cassini); nuclear materials technology research; nuclear materials storage; and remediation of nuclear waste. The Operations Center of TA-55 is the nerve center of the facility where operators are on duty around the clock and monitor several thousand data points using the Facility Control System (FCS). The FCS monitors, displays, alarms, and provides some limited control of the following systems; HVAC, fire detection and suppression, radiation detection, electrical, and other miscellaneous systems. The FCS was originally based on late 1970s digital technology, which is not longer supported by the vendors. Additionally, the equipment failure rates increased notably in the 1990s. Thus, plans were put into place to upgrade and replace the FCS hardware, software, and display components with modernized equipment. The process was complicated by the facts that: the facility was operational and could not be totally closed for the modifications; complete documentation was not available for the existing system; the Safety Analyses for the facility were in the process of being upgraded at the same time; and of course limited time and budgets. This paper will discuss the human factors aspects of the design, installation, and testing of the new FCS within the above noted constraints. Particular items to be discussed include the functional requirements definition, operating experience review, screen designs, test program, operator training, and phased activation of the new circuits in an operational facility