WorldWideScience

Sample records for sample block plans

  1. Automation of block assignment planning using a diagram-based scenario modeling method

    Directory of Open Access Journals (Sweden)

    In Hyuck Hwang

    2014-03-01

    Full Text Available Most shipbuilding scheduling research so far has focused on the load level on the dock plan. This is because the dock is the least extendable resource in shipyards, and its overloading is difficult to resolve. However, once dock scheduling is completed, making a plan that makes the best use of the rest of the resources in the shipyard to minimize any additional cost is also important. Block assignment planning is one of the midterm planning tasks; it assigns a block to the facility (factory/shop or surface plate that will actually manufacture the block according to the block characteristics and current situation of the facility. It is one of the most heavily loaded midterm planning tasks and is carried out manually by experienced workers. In this study, a method of representing the block assignment rules using a diagram was suggested through analysis of the existing manual process. A block allocation program was developed which automated the block assignment process according to the rules represented by the diagram. The planning scenario was validated through a case study that compared the manual assignment and two automated block assignment results.

  2. Automation of block assignment planning using a diagram-based scenario modeling method

    Directory of Open Access Journals (Sweden)

    Hwang In Hyuck

    2014-03-01

    Full Text Available Most shipbuilding scheduling research so far has focused on the load level on the dock plan. This is be¬cause the dock is the least extendable resource in shipyards, and its overloading is difficult to resolve. However, once dock scheduling is completed, making a plan that makes the best use of the rest of the resources in the shipyard to minimize any additional cost is also important. Block assignment planning is one of the midterm planning tasks; it assigns a block to the facility (factory/shop or surface plate that will actually manufacture the block according to the block characteristics and current situation of the facility. It is one of the most heavily loaded midterm planning tasks and is carried out manu¬ally by experienced workers. In this study, a method of representing the block assignment rules using a diagram was su¬ggested through analysis of the existing manual process. A block allocation program was developed which automated the block assignment process according to the rules represented by the diagram. The planning scenario was validated through a case study that compared the manual assignment and two automated block assignment results.

  3. A Study on Planning Strategies for Urban Housing Block Development

    Institute of Scientific and Technical Information of China (English)

    Zeng Wei; Wang Hua; You Juanjuan; Wang Linlin; Li Caige

    2016-01-01

    As a city is the carrier of human society and housing is an important part of a citizen's life and survival,the citizens' choice of their housing mode will influence the material and spiritual life of the individuals,families,and society.In view of the diversification of values and investments,people are eager for a harmonious relationship between the community and the city.As a kind of compact and efficient housing mode,the housing block highlights the organic link of the community within the city in an open and shared living environment.This paper reviews the development of housing blocks in various countries and summarizes the characteristics of housing blocks through a comparison with traditional gated residential quarters and urban blocks.It then analyzes the current difficulties of housing block development in China from aspects such as the planning concept,planning system,management mode,and development mode and accordingly proposes planning principles and strategies in hope of providing theoretical supports for the development and construction of housing blocks in China.

  4. Efficacy of virtual block objects in reducing the lung dose in helical tomotherapy planning for cervical oesophageal cancer: a planning study.

    Science.gov (United States)

    Ito, Makoto; Shimizu, Hidetoshi; Aoyama, Takahiro; Tachibana, Hiroyuki; Tomita, Natsuo; Makita, Chiyoko; Koide, Yutaro; Kato, Daiki; Ishiguchi, Tsuneo; Kodaira, Takeshi

    2018-04-04

    Intensity-modulated radiotherapy is useful for cervical oesophageal carcinoma (CEC); however, increasing low-dose exposure to the lung may lead to radiation pneumonitis. Nevertheless, an irradiation technique that avoids the lungs has never been examined due to the high difficulty of dose optimization. In this study, we examined the efficacy of helical tomotherapy that can restrict beamlets passing virtual blocks during dose optimization computing (block plan) in reducing the lung dose. Fifteen patients with CEC were analysed. The primary/nodal lesion and prophylactic nodal region with adequate margins were defined as the planning target volume (PTV)-60 Gy and PTV-48 Gy, respectively. Nineteen plans per patient were made and compared (total: 285 plans), including non-block and block plans with several shapes and sizes. The most appropriate block model was semi-circular, 8 cm outside of the tracheal bifurcation, with a significantly lower lung dose compared to that of non-block plans; the mean lung volumes receiving 5 Gy, 10 Gy, 20 Gy, and the mean lung dose were 31.3% vs. 48.0% (p block and non-block plans were comparable in terms of the homogeneity and conformity indexes of PTV-60 Gy: 0.05 vs. 0.04 (p = 0.100) and 0.82 vs. 0.85 (p = 0.616), respectively. The maximum dose of the spinal cord planning risk volume increased slightly (49.4 Gy vs. 47.9 Gy, p = 0.002). There was no significant difference in the mean doses to the heart and the thyroid gland. Prolongation of the delivery time was less than 1 min (5.6 min vs. 4.9 min, p = 0.010). The block plan for CEC could significantly reduce the lung dose, with acceptable increment in the spinal dose and a slightly prolonged delivery time.

  5. Strength and deformability of hollow concrete blocks: correlation of block and cylindrical sample test results

    Directory of Open Access Journals (Sweden)

    C. S. Barbosa

    Full Text Available This paper deals with correlations among mechanical properties of hollow blocks and those of concrete used to make them. Concrete hollow blocks and test samples were moulded with plastic consistency concrete, to assure the same material in all cases, in three diferente levels of strength (nominally 10 N/mm², 20 N/mm² and 30 N/mm². The mechanical properties and structural behaviour in axial compression and tension tests were determined by standard tests in blocks and cylinders. Stress and strain analyses were made based on concrete’s modulus of elasticity obtained in the sample tests as well as on measured strain in the blocks’ face-shells and webs. A peculiar stress-strain analysis, based on the superposition of effects, provided an estimation of the block load capacity based on its deformations. In addition, a tentative method to preview the block deformability from the concrete mechanical properties is described and tested. This analysis is a part of a broader research that aims to support a detailed structural analysis of blocks, prisms and masonry constructions.

  6. Strength and deformability of hollow concrete blocks: correlation of block and cylindrical sample test results

    OpenAIRE

    Barbosa, C. S.; Hanai, J.B.

    2009-01-01

    This paper deals with correlations among mechanical properties of hollow blocks and those of concrete used to make them. Concrete hollow blocks and test samples were moulded with plastic consistency concrete, to assure the same material in all cases, in three diferente levels of strength (nominally 10 N/mm², 20 N/mm² and 30 N/mm²). The mechanical properties and structural behaviour in axial compression and tension tests were determined by standard tests in blocks and cylinders. Stress and str...

  7. Special nuclear material inventory sampling plans

    International Nuclear Information System (INIS)

    Vaccaro, H.; Goldman, A.

    1987-01-01

    Since their introduction in 1942, sampling inspection procedures have been common quality assurance practice. The U.S. Department of Energy (DOE) supports such sampling of special nuclear materials inventories. The DOE Order 5630.7 states, Operations Offices may develop and use statistically valid sampling plans appropriate for their site-specific needs. The benefits for nuclear facilities operations include reduced worker exposure and reduced work load. Improved procedures have been developed for obtaining statistically valid sampling plans that maximize these benefits. The double sampling concept is described and the resulting sample sizes for double sample plans are compared with other plans. An algorithm is given for finding optimal double sampling plans that assist in choosing the appropriate detection and false alarm probabilities for various sampling plans

  8. Special nuclear material inventory sampling plans

    International Nuclear Information System (INIS)

    Vaccaro, H.S.; Goldman, A.S.

    1987-01-01

    This paper presents improved procedures for obtaining statistically valid sampling plans for nuclear facilities. The double sampling concept and methods for developing optimal double sampling plans are described. An algorithm is described that is satisfactory for finding optimal double sampling plans and choosing appropriate detection and false alarm probabilities

  9. IAEA Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geist, William H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-15

    The objectives for this presentation are to describe the method that the IAEA uses to determine a sampling plan for nuclear material measurements; describe the terms detection probability and significant quantity; list the three nuclear materials measurement types; describe the sampling method applied to an item facility; and describe multiple method sampling.

  10. A comparison of attribute sampling plans

    International Nuclear Information System (INIS)

    Lanning, B.M.

    1997-05-01

    This report describes, compares, and provides sample size selection criteria for the most common sampling plans for attribute data (i.e., data that is qualitative in nature such as Pass-Fail, Yes-No, Defect-Nondefect data). This report is being issued as a guide in prudently choosing the correct sampling plan to meet statistical plan objectives. The report discusses three types of sampling plans: AQL (Acceptable Quality Level expressed as a percent), RQL (Rejectable Quality Level as a percent), and the AQL/RQL plan which emphasizes both risks simultaneously. These plans are illustrated with six examples, one of which is an inventory of UF 6 cans whose weight must agree within 100 grams of its listed weight to be acceptable

  11. 40 CFR 141.802 - Coliform sampling plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Coliform sampling plan. 141.802... sampling plan. (a) Each air carrier under this subpart must develop a coliform sampling plan covering each... required actions, including repeat and follow-up sampling, corrective action, and notification of...

  12. Blocked Randomization with Randomly Selected Block Sizes

    Directory of Open Access Journals (Sweden)

    Jimmy Efird

    2010-12-01

    Full Text Available When planning a randomized clinical trial, careful consideration must be given to how participants are selected for various arms of a study. Selection and accidental bias may occur when participants are not assigned to study groups with equal probability. A simple random allocation scheme is a process by which each participant has equal likelihood of being assigned to treatment versus referent groups. However, by chance an unequal number of individuals may be assigned to each arm of the study and thus decrease the power to detect statistically significant differences between groups. Block randomization is a commonly used technique in clinical trial design to reduce bias and achieve balance in the allocation of participants to treatment arms, especially when the sample size is small. This method increases the probability that each arm will contain an equal number of individuals by sequencing participant assignments by block. Yet still, the allocation process may be predictable, for example, when the investigator is not blind and the block size is fixed. This paper provides an overview of blocked randomization and illustrates how to avoid selection bias by using random block sizes.

  13. Waste classification sampling plan

    International Nuclear Information System (INIS)

    Landsman, S.D.

    1998-01-01

    The purpose of this sampling is to explain the method used to collect and analyze data necessary to verify and/or determine the radionuclide content of the B-Cell decontamination and decommissioning waste stream so that the correct waste classification for the waste stream can be made, and to collect samples for studies of decontamination methods that could be used to remove fixed contamination present on the waste. The scope of this plan is to establish the technical basis for collecting samples and compiling quantitative data on the radioactive constituents present in waste generated during deactivation activities in B-Cell. Sampling and radioisotopic analysis will be performed on the fixed layers of contamination present on structural material and internal surfaces of process piping and tanks. In addition, dose rate measurements on existing waste material will be performed to determine the fraction of dose rate attributable to both removable and fixed contamination. Samples will also be collected to support studies of decontamination methods that are effective in removing the fixed contamination present on the waste. Sampling performed under this plan will meet criteria established in BNF-2596, Data Quality Objectives for the B-Cell Waste Stream Classification Sampling, J. M. Barnett, May 1998

  14. Appendix F - Sample Contingency Plan

    Science.gov (United States)

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  15. Statistical sampling plans

    International Nuclear Information System (INIS)

    Jaech, J.L.

    1984-01-01

    In auditing and in inspection, one selects a number of items by some set of procedures and performs measurements which are compared with the operator's values. This session considers the problem of how to select the samples to be measured, and what kinds of measurements to make. In the inspection situation, the ultimate aim is to independently verify the operator's material balance. The effectiveness of the sample plan in achieving this objective is briefly considered. The discussion focuses on the model plant

  16. Utility of Cytospin and Cell block Technology in Evaluation of Body Fluids and Urine Samples: A Comparative Study.

    Science.gov (United States)

    Qamar, Irmeen; Rehman, Suhailur; Mehdi, Ghazala; Maheshwari, Veena; Ansari, Hena A; Chauhan, Sunanda

    2018-01-01

    Cytologic examination of body fluids commonly involves the use of direct or sediment smears, cytocentrifuge preparations, membrane filter preparations, or cell block sections. Cytospin and cell block techniques are extremely useful in improving cell yield of thin serous effusions and urine samples, and ensure high diagnostic efficacy. We studied cytospin preparations and cell block sections prepared from 180 samples of body fluids and urine samples to compare the relative efficiency of cell retrieval, preservation of cell morphology, ease of application of special stains, and diagnostic efficacy. Samples were collected and processed to prepare cytospin smears and cell block sections. We observed that overall, cell yield and preservation of individual cell morphology were better in cytospin preparations as compared to cell blocks, while preservation of architectural pattern was better in cell block sections. The number of suspicious cases also decreased on cell block sections, with increased detection of malignancy. It was difficult to prepare cell blocks from urine samples due to low cellularity. Cytospin technology is a quick, efficient, and cost-effective method of increasing cell yield in hypocellular samples, with better preservation of cell morphology. Cell blocks are better prepared from high cellularity fluids; however, tissue architecture is better studied, with improved rate of diagnosis and decrease in ambiguous results. Numerous sections can be prepared from a small amount of material. Special stains and immunochemical stains can be easily applied to cell blocks. It also provides a source of archival material.

  17. Hanford site transuranic waste sampling plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    This sampling plan (SP) describes the selection of containers for sampling of homogeneous solids and soil/gravel and for visual examination of transuranic and mixed transuranic (collectively referred to as TRU) waste generated at the U.S. Department of Energy (DOE) Hanford Site. The activities described in this SP will be conducted under the Hanford Site TRU Waste Certification Program. This SP is designed to meet the requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (CAO-94-1010) (DOE 1996a) (QAPP), site-specific implementation of which is described in the Hanford Site Transuranic Waste Characterization Program Quality Assurance Project Plan (HNF-2599) (Hanford 1998b) (QAPP). The QAPP defines the quality assurance (QA) requirements and protocols for TRU waste characterization activities at the Hanford Site. In addition, the QAPP identifies responsible organizations, describes required program activities, outlines sampling and analysis strategies, and identifies procedures for characterization activities. The QAPP identifies specific requirements for TRU waste sampling plans. Table 1-1 presents these requirements and indicates sections in this SP where these requirements are addressed

  18. Realizing block planning concepts in make-and-pack production using MILP modelling and SAP APO

    DEFF Research Database (Denmark)

    Günther, H.O.; Grunow, M.; Neuhaus, U.

    2006-01-01

    of a major producer of hair dyes as a case study. We present two different implementations of the block planning concept. One utilizes the Production Planning/Detailed Scheduling module of the SAP APO© software. The other approach is based on a mixed-integer linear programming formulation. In contrast...

  19. The contribution of cell blocks in the diagnosis of mediastinal masses and hilar adenopathy samples from echobronchoscopy.

    Science.gov (United States)

    Lourido-Cebreiro, Tamara; Leiro-Fernández, Virginia; Tardio-Baiges, Antoni; Botana-Rial, Maribel; Núñez-Delgado, Manuel; Álvarez-Martín, M Jesús; Fernández-Villar, Alberto

    2014-07-01

    Cell block material from puncture can be obtained with endobronchial ultrasound-guided transbronchial needle aspiration (EBUS-TBNA) in many cases. The aim of this study was to analyse the value of additional information from cell blocks obtained with EBUS-TBNA samples from mediastinal and hilar lymph nodes and masses. Review of pathology reports with a specific diagnosis obtained from EBUS-TBNA samples of mediastinal or hilar lesions, prospectively obtained over a two-year period. The generation of cell blocks from cytology needle samples, the contribution to morphological diagnosis, and the possible use of samples for immunohistochemistry were analysed. One hundred and twenty-nine samples corresponding to 110 patients were reviewed. The diagnosis was lung cancer in 81% of cases, extrapulmonary carcinoma in 10%, sarcoidosis in 4%, lymphoma in 2.7%, and tuberculosis in 0.9%. Cell blocks could be obtained in 72% of cases. Immunohistochemistry studies on the cell blocks were significantly easier to perform than on conventional smears (52.6% vs. 14%, P<.0001). In 4cases, the cell block provided an exclusive morphological diagnosis (3sarcoidosis and one metastasis from prostatic carcinoma) and in 3carcinomas, subtype and origin could be identified. Exclusive diagnoses from the cell block were significantly more frequent in benign disease than in malignant disease (25% vs 0.9%, P=.002). Cell blocks were obtained from 72% of EBUS-TBNA diagnostic procedures. The main contributions of cell blocks to pathology examinations were the possibility of carrying out immunohistochemical staining for the better classification of neoplasms, especially extrapulmonary metastatic tumours, and the improved diagnosis of benign lesions. Copyright © 2013 SEPAR. Published by Elsevier Espana. All rights reserved.

  20. Appendix E - Sample Production Facility Plan

    Science.gov (United States)

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix E is intended to provide examples and illustrations of how a production facility could address a variety of scenarios in its SPCC Plan.

  1. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    International Nuclear Information System (INIS)

    T. Haney R. VanHorn

    2007-01-01

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used to determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality

  2. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    Energy Technology Data Exchange (ETDEWEB)

    T. Haney

    2007-07-31

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.

  3. Testing .NET application blocks version 1.0

    CERN Document Server

    Microsoft. Redmond

    2005-01-01

    Complex software environments require more in-depth testing. This book delivers the detailed guidance you need to plan and execute testing for the solutions you develop with Microsoft PATTERNS & PRACTICES application blocks. Whether you're customizing the application blocks or integrating them into existing applications, you'll understand the key considerations for verifying that your code meets its requirements for performance, availability, scalability, compatibility, globalization, and security features. You'll find code examples, sample test cases, and checklists that demonstrate how to p

  4. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Marutzky, Sam; Farnham, Irene

    2014-10-01

    The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.

  5. Final Sampling and Analysis Plan for Background Sampling, Fort Sheridan, Illinois

    National Research Council Canada - National Science Library

    1995-01-01

    .... This Background Sampling and Analysis Plan (BSAP) is designed to address this issue through the collection of additional background samples at Fort Sheridan to support the statistical analysis and the Baseline Risk Assessment (BRA...

  6. The study of importance sampling in Monte-carlo calculation of blocking dips

    International Nuclear Information System (INIS)

    Pan Zhengying; Zhou Peng

    1988-01-01

    Angular blocking dips around the axis in Al single crystal of α-particles of about 2 Mev produced at a depth of 0.2 μm are calculated by a Monte-carlo simulation. The influence of the small solid angle emission of particles and the importance sampling in the solid angle emission have been investigated. By means of importance sampling, a more reasonable results with high accuracy are obtained

  7. Integrated sampling and analysis plan for samples measuring >10 mrem/hour

    International Nuclear Information System (INIS)

    Haller, C.S.

    1992-03-01

    This integrated sampling and analysis plan was prepared to assist in planning and scheduling of Hanford Site sampling and analytical activities for all waste characterization samples that measure greater than 10 mrem/hour. This report also satisfies the requirements of the renegotiated Interim Milestone M-10-05 of the Hanford Federal Facility Agreement and Consent Order (the Tri-Party Agreement). For purposes of comparing the various analytical needs with the Hanford Site laboratory capabilities, the analytical requirements of the various programs were normalized by converting required laboratory effort for each type of sample to a common unit of work, the standard analytical equivalency unit (AEU). The AEU approximates the amount of laboratory resources required to perform an extensive suite of analyses on five core segments individually plus one additional suite of analyses on a composite sample derived from a mixture of the five core segments and prepare a validated RCRA-type data package

  8. Group Acceptance Sampling Plan for Lifetime Data Using Generalized Pareto Distribution

    Directory of Open Access Journals (Sweden)

    Muhammad Aslam

    2010-02-01

    Full Text Available In this paper, a group acceptance sampling plan (GASP is introduced for the situations when lifetime of the items follows the generalized Pareto distribution. The design parameters such as minimum group size and acceptance number are determined when the consumer’s risk and the test termination time are specified. The proposed sampling plan is compared with the existing sampling plan. It is concluded that the proposed sampling plan performs better than the existing plan in terms of minimum sample size required to reach the same decision.

  9. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene

    2018-03-01

    The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR

  10. 42 CFR 431.814 - Sampling plan and procedures.

    Science.gov (United States)

    2010-10-01

    ... reliability of the reduced sample. (4) The sample selection procedure. Systematic random sampling is... sampling, and yield estimates with the same or better precision than achieved in systematic random sampling... 42 Public Health 4 2010-10-01 2010-10-01 false Sampling plan and procedures. 431.814 Section 431...

  11. UMTRA project water sampling and analysis plan, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1994-06-01

    This water sampling and analysis plan summarizes the results of previous water sampling activities and the plan for water sampling activities for calendar year 1994. A buffer zone monitoring plan is included as an appendix. The buffer zone monitoring plan is designed to protect the public from residual contamination that entered the ground water as a result of former milling operations. Surface remedial action at the Gunnison Uranium Mill Tailings Remedial Action Project site began in 1992; completion is expected in 1995. Ground water and surface water will be sampled semiannually in 1994 at the Gunnison processing site (GUN-01) and disposal site (GUN-08). Results of previous water sampling at the Gunnison processing site indicate that ground water in the alluvium is contaminated by the former uranium processing activities. Background ground water conditions have been established in the uppermost aquifer (Tertiary gravels) at the Gunnison disposal site. The monitor well locations provide a representative distribution of sampling points to characterize ground water quality and ground water flow conditions in the vicinity of the sites. The list of analytes has been modified with time to reflect constituents that are related to uranium processing activities and the parameters needed for geochemical evaluation. Water sampling will be conducted at least semiannually during and one year following the period of construction activities, to comply with the ground water protection strategy discussed in the remedial action plan (DOE, 1992a)

  12. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  13. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  14. Evaluation Of Open, Wedge Filtered And Half Block Profile For Single And Plan Parallel Field For 60Co Teletherapy Unit

    International Nuclear Information System (INIS)

    Heru-Prasetio; Nasukha; Soejoko, Djarwani S

    2003-01-01

    TPS shall be evaluated with experimental data before it is used for patient treatment. This experiment was performed using small water phantom, at the depth of 10 cm, SSD technique for single beam and 16 cm, SAD technique for plan parallel beam. Measuring device used in this experiment is Farmer 2571 detector. It was found differences between experiment and TPS iSis are not significant. Single field experiment and TPS differences of 0.6%, 3.6% and 0.1% for open, wedge filter and half-blocked field, for plan parallel experiment and TPS differences are 2.1%, 2% and 2.4% for open, wedge filter and half-blocked field. (author)

  15. A novel directional asymmetric sampling search algorithm for fast block-matching motion estimation

    Science.gov (United States)

    Li, Yue-e.; Wang, Qiang

    2011-11-01

    This paper proposes a novel directional asymmetric sampling search (DASS) algorithm for video compression. Making full use of the error information (block distortions) of the search patterns, eight different direction search patterns are designed for various situations. The strategy of local sampling search is employed for the search of big-motion vector. In order to further speed up the search, early termination strategy is adopted in procedure of DASS. Compared to conventional fast algorithms, the proposed method has the most satisfactory PSNR values for all test sequences.

  16. Feasible sampling plan for Bemisia tabaci control decision-making in watermelon fields.

    Science.gov (United States)

    Lima, Carlos Ho; Sarmento, Renato A; Pereira, Poliana S; Galdino, Tarcísio Vs; Santos, Fábio A; Silva, Joedna; Picanço, Marcelo C

    2017-11-01

    The silverleaf whitefly Bemisia tabaci is one of the most important pests of watermelon fields worldwide. Conventional sampling plans are the starting point for the generation of decision-making systems of integrated pest management programs. The aim of this study was to determine a conventional sampling plan for B. tabaci in watermelon fields. The optimal leaf for B. tabaci adult sampling was the 6 th most apical leaf. Direct counting was the best pest sampling technique. Crop pest densities fitted the negative binomial distribution and had a common aggregation parameter (K common ). The sampling plan consisted of evaluating 103 samples per plot. This sampling plan was conducted for 56 min, costing US$ 2.22 per sampling and with a 10% maximum evaluation error. The sampling plan determined in this study can be adopted by farmers because it enables the adequate evaluation of B. tabaci populations in watermelon fields (10% maximum evaluation error) and is a low-cost (US$ 2.22 per sampling), fast (56 min per sampling) and feasible (because it may be used in a standardized way throughout the crop cycle) technique. © 2017 Society of Chemical Industry. © 2017 Society of Chemical Industry.

  17. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1996-02-01

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site

  18. Sampling and Analysis Instruction for the Demolition of the Masonry Block for the 108-F Biological Laboratory

    International Nuclear Information System (INIS)

    Byrnes, M. E.

    1999-01-01

    This sampling and analysis instruction (SAI) has been prepared to clearly define the sampling and analysis activities to be performed in support of the demolition and disposition (or disposal) of the 108-F Biological Laboratory masonry block walls

  19. Hydrogeologic investigations sampling plan: Revision 0

    International Nuclear Information System (INIS)

    1988-11-01

    The goal of this sampling plan is to identify and develop specific plans for those investigative actions necessary to: (1) characterize the hydrologic regime; (2) define the extent and impact of contamination; and (3) predict future contaminant migration for the Weldon Spring Site (WSS) and vicinity. The plan is part of the Weldon Spring Site Remedial Action Project (WSSRAP) sponsored by the US Department of Energy (DOE) and has been developed in accordance with US EPA Remedial Investigation (RI) and Data Quality Objective (DQO) guidelines. The plan consists of a sequence of activities including the evaluation of data, development of a conceptual model, identification of data uses and needs, and the design and implementation of a data collection program. Data will be obtained to: (1) confirm the presence or absence of contaminants; (2) define contaminant sources and modes of transport; (3) delineate extent of contaminant migration and predict future migration; and (4) provide information to support the evaluation and selection of remedial actions. 81 refs., 62 figs., 26 tabs

  20. UMTRA project water sampling and analysis plan, Maybell, Colorado

    International Nuclear Information System (INIS)

    1994-06-01

    This water sampling and analysis plan (WSAP) describes planned water sampling activities and provides the regulatory and technical basis for ground water sampling in 1994 at the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Maybell, Colorado. The WSAP identifies and justifies sampling locations, analytical parameters, and sampling frequencies at the site. The ground water data will be used for site characterization and risk assessment. The regulatory basis for the ground water and surface water monitoring activities is derived from the EPA regulations in 40 CFR Part 192 (1993) and the proposed EPA standards of 1987 (52 FR 36000). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. This WSAP also includes a summary and the results of water sampling activities from 1989 through 1992 (no sampling was performed in 1993)

  1. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine Project

    Directory of Open Access Journals (Sweden)

    Pedro Henrique Alves Campos

    Full Text Available Abstract Historically, since the 60's, traditional mine planning consists of several distinct stages: 1 Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2 Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3 Long-term production scheduling. Although considered quite satisfactory, this methodology presents some flaws: The stages, even if considered individually optimal, may not be when put together. The opportunity cost is not considered and the cut-off is fixed. Due to the recent computational advances, a new technique has been growing and is more reliable: the direct block sequencing. In this methodology, the steps are consolidated into only one process, improving the economic results, reducing the total execution time and obtaining, in fact, an optimal planning. The aim of this work is to compare the results of the two planning methods applied in a database of a Brazilian iron ore mine and to show the real advantages and disadvantages of each one. To solve the direct block sequencing technique, Doppler was used, a tool developed by Delphos Mine Planning Laboratory, located at the University of Chile. The traditional methodology was executed through Whittle software. Lastly, a medium-term scheduling was performed using Deswik software.

  2. The Toggle Local Planner for sampling-based motion planning

    KAUST Repository

    Denny, Jory; Amato, Nancy M.

    2012-01-01

    Sampling-based solutions to the motion planning problem, such as the probabilistic roadmap method (PRM), have become commonplace in robotics applications. These solutions are the norm as the dimensionality of the planning space grows, i.e., d > 5

  3. UMTRA Project water sampling and analysis plan, Gunnison, Colorado: Revision 1

    International Nuclear Information System (INIS)

    1994-11-01

    This water sampling and analysis plan summarizes the results of previous water sampling activities and the plan for future water sampling activities, in accordance with the Guidance Document for Preparing Sampling and Analysis Plans for UMTRA Sites. A buffer zone monitoring plan for the Dos Rios Subdivision is included as an appendix. The buffer zone monitoring plan was developed to ensure continued protection to the public from residual contamination. The buffer zone is beyond the area depicted as contaminated ground water due to former milling operations. Surface remedial action at the Gunnison Uranium Mill Tailings Remedial Action Project site began in 1992; completion is expected in 1995. Ground water and surface water will be sampled semiannually at the Gunnison processing site and disposal site. Results of previous water sampling at the Gunnison processing site indicate that ground water in the alluvium is contaminated by the former uranium processing activities. Background ground water conditions have been established in the uppermost aquifer at the Gunnison disposal site. The monitor well locations provide a representative distribution of sampling points to characterize ground water quality and ground water flow conditions in the vicinity of the sites. The list of analytes has been modified with time to reflect constituents that are related to uranium processing activities and the parameters needed for geochemical evaluation

  4. Sample collection and sample analysis plan in support of the 105-C/190-C concrete and soil sampling activities

    International Nuclear Information System (INIS)

    Marske, S.G.

    1996-07-01

    This sampling and analysis plan describes the sample collection and sample analysis in support of the 105-C water tunnels and 190-C main pumphouse concrete and soil sampling activities. These analytical data will be used to identify the radiological contamination and presence of hazardous materials to support the decontamination and disposal activities

  5. UMTRA water sampling and analysis plan, Green River, Utah

    International Nuclear Information System (INIS)

    Papusch, R.

    1993-12-01

    The purpose of this water sampling and analysis plan (WSAP) is to provide a basis for groundwater and surface water sampling at the Green River Uranium Mill Tailing Remedial Action (UMTRA) Project site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring locations

  6. Compatibility Grab Sampling and Analysis Plan for Fiscal Year 2001

    International Nuclear Information System (INIS)

    LAURICELLA, T.L.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for grab samples obtained to address waste compatibility

  7. Nitrate Waste Treatment Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory; Martinez, Patrick Thomas [Los Alamos National Laboratory; Garcia, Terrence Kerwin [Los Alamos National Laboratory

    2017-07-05

    This plan is designed to outline the collection and analysis of nitrate salt-bearing waste samples required by the New Mexico Environment Department- Hazardous Waste Bureau in the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit).

  8. Sampling plans for pest mites on physic nut.

    Science.gov (United States)

    Rosado, Jander F; Sarmento, Renato A; Pedro-Neto, Marçal; Galdino, Tarcísio V S; Marques, Renata V; Erasmo, Eduardo A L; Picanço, Marcelo C

    2014-08-01

    The starting point for generating a pest control decision-making system is a conventional sampling plan. Because the mites Polyphagotarsonemus latus and Tetranychus bastosi are among the most important pests of the physic nut (Jatropha curcas), in the present study, we aimed to establish sampling plans for these mite species on physic nut. Mite densities were monitored in 12 physic nut crops. Based on the obtained results, sampling of P. latus and T. bastosi should be performed by assessing the number of mites per cm(2) in 160 samples using a handheld 20× magnifying glass. The optimal sampling region for T. bastosi is the abaxial surface of the 4th most apical leaf on the branch of the middle third of the canopy. On the abaxial surface, T. bastosi should then be observed on the side parts of the middle portion of the leaf, near its edge. As for P. latus, the optimal sampling region is the abaxial surface of the 4th most apical leaf on the branch of the apical third of the canopy on the abaxial surface. Polyphagotarsonemus latus should then be assessed on the side parts of the leaf's petiole insertion. Each sampling procedure requires 4 h and costs US$ 7.31.

  9. Using Load Balancing to Scalably Parallelize Sampling-Based Motion Planning Algorithms

    KAUST Repository

    Fidel, Adam; Jacobs, Sam Ade; Sharma, Shishir; Amato, Nancy M.; Rauchwerger, Lawrence

    2014-01-01

    Motion planning, which is the problem of computing feasible paths in an environment for a movable object, has applications in many domains ranging from robotics, to intelligent CAD, to protein folding. The best methods for solving this PSPACE-hard problem are so-called sampling-based planners. Recent work introduced uniform spatial subdivision techniques for parallelizing sampling-based motion planning algorithms that scaled well. However, such methods are prone to load imbalance, as planning time depends on region characteristics and, for most problems, the heterogeneity of the sub problems increases as the number of processors increases. In this work, we introduce two techniques to address load imbalance in the parallelization of sampling-based motion planning algorithms: an adaptive work stealing approach and bulk-synchronous redistribution. We show that applying these techniques to representatives of the two major classes of parallel sampling-based motion planning algorithms, probabilistic roadmaps and rapidly-exploring random trees, results in a more scalable and load-balanced computation on more than 3,000 cores. © 2014 IEEE.

  10. Using Load Balancing to Scalably Parallelize Sampling-Based Motion Planning Algorithms

    KAUST Repository

    Fidel, Adam

    2014-05-01

    Motion planning, which is the problem of computing feasible paths in an environment for a movable object, has applications in many domains ranging from robotics, to intelligent CAD, to protein folding. The best methods for solving this PSPACE-hard problem are so-called sampling-based planners. Recent work introduced uniform spatial subdivision techniques for parallelizing sampling-based motion planning algorithms that scaled well. However, such methods are prone to load imbalance, as planning time depends on region characteristics and, for most problems, the heterogeneity of the sub problems increases as the number of processors increases. In this work, we introduce two techniques to address load imbalance in the parallelization of sampling-based motion planning algorithms: an adaptive work stealing approach and bulk-synchronous redistribution. We show that applying these techniques to representatives of the two major classes of parallel sampling-based motion planning algorithms, probabilistic roadmaps and rapidly-exploring random trees, results in a more scalable and load-balanced computation on more than 3,000 cores. © 2014 IEEE.

  11. Economic Design of Acceptance Sampling Plans in a Two-Stage Supply Chain

    Directory of Open Access Journals (Sweden)

    Lie-Fern Hsu

    2012-01-01

    Full Text Available Supply Chain Management, which is concerned with material and information flows between facilities and the final customers, has been considered the most popular operations strategy for improving organizational competitiveness nowadays. With the advanced development of computer technology, it is getting easier to derive an acceptance sampling plan satisfying both the producer's and consumer's quality and risk requirements. However, all the available QC tables and computer software determine the sampling plan on a noneconomic basis. In this paper, we design an economic model to determine the optimal sampling plan in a two-stage supply chain that minimizes the producer's and the consumer's total quality cost while satisfying both the producer's and consumer's quality and risk requirements. Numerical examples show that the optimal sampling plan is quite sensitive to the producer's product quality. The product's inspection, internal failure, and postsale failure costs also have an effect on the optimal sampling plan.

  12. UMTRA Project water sampling and analysis plan, Salt Lake City, Utah. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    This water sampling and analysis plan describes planned, routine ground water sampling activities at the US Department of Energy Uranium Mill Tailings Remedial Action Project site in Salt Lake City, Utah. This plan identifies and justifies sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring of ground water, sediments, and surface waters at monitoring stations on the site

  13. Ventilation and Air Quality in City Blocks Using Large-Eddy Simulation—Urban Planning Perspective

    Directory of Open Access Journals (Sweden)

    Mona Kurppa

    2018-02-01

    Full Text Available Buildings and vegetation alter the wind and pollutant transport in urban environments. This comparative study investigates the role of orientation and shape of perimeter blocks on the dispersion and ventilation of traffic-related air pollutants, and the street-level concentrations along a planned city boulevard. A large-eddy simulation (LES model PALM is employed over a highly detailed representation of the urban domain including street trees and forested areas. Air pollutants are represented by massless and passive particles (non-reactive gases, which are released with traffic-related emission rates. High-resolution simulations for four different city-block-structures are conducted over a 8.2 km 2 domain under two contrasting inflow conditions with neutral and stable atmospheric stratification corresponding the general and wintry meteorological conditions. Variation in building height together with multiple cross streets along the boulevard improves ventilation, resulting in 7–9% lower mean concentrations at pedestrian level. The impact of smaller scale variability in building shape was negligible. Street trees further complicate the flow and dispersion. Notwithstanding the surface roughness, atmospheric stability controls the concentration levels with higher values under stably stratified inflow. Little traffic emissions are transported to courtyards. The results provide urban planners direct information to reduce air pollution by proper structural layout of perimeter blocks.

  14. Tank 241-BY-105 rotary core sampling and analysis plan

    International Nuclear Information System (INIS)

    Sasaki, L.M.

    1995-01-01

    This Sampling and Analysis Plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for two rotary-mode core samples from tank 241-BY-105 (BY-105)

  15. 105-DR Large Sodium Fire Facility decontamination, sampling, and analysis plan

    International Nuclear Information System (INIS)

    Knaus, Z.C.

    1995-01-01

    This is the decontamination, sampling, and analysis plan for the closure activities at the 105-DR Large Sodium Fire Facility at Hanford Reservation. This document supports the 105-DR Large Sodium Fire Facility Closure Plan, DOE-RL-90-25. The 105-DR LSFF, which operated from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility in the 100-D Area of the Hanford Site. The LSFF was established to investigate fire fighting and safety associated with alkali metal fires in the liquid metal fast breeder reactor facilities. The decontamination, sampling, and analysis plan identifies the decontamination procedures, sampling locations, any special handling requirements, quality control samples, required chemical analysis, and data validation needed to meet the requirements of the 105-DR Large Sodium Fire Facility Closure Plan in compliance with the Resource Conservation and Recovery Act

  16. Microstructural Analyses of Topopah Spring Tuff from the Large Block Test at Fran Ridge, Nevada

    International Nuclear Information System (INIS)

    Roberts, J.J.

    2000-01-01

    Microstructural information (e.g., porosity, pore size distribution, and surface area) of porous media is critical to understanding water transport mechanisms and physical properties and their bearing on geophysical measurements. We report microstructural data obtained by mercury injection porosimetry (MIP) on 33 samples of densely welded Topopah Spring tuff from Fran Ridge, Yucca Mountain, Nevada Test Site (NTS), Nevada. The characterization of these samples is also important for the interpretation and analysis of the Large Block Test (LBT) performed in support of the Yucca Mountain Project (YMP). This report includes previously published data on samples from the same location (Roberts and Lin, 1996). We also present information from the Yucca Mountain Site Characterization Project/Lawrence Livermore National Laboratory (YMSCP/LLNL) Large Block Test Engineering Plan (Wilder, 1995) to allow correlation of our data directly to various planes within the Large Block

  17. Reachable Distance Space: Efficient Sampling-Based Planning for Spatially Constrained Systems

    KAUST Repository

    Xinyu Tang,

    2010-01-25

    Motion planning for spatially constrained robots is difficult due to additional constraints placed on the robot, such as closure constraints for closed chains or requirements on end-effector placement for articulated linkages. It is usually computationally too expensive to apply sampling-based planners to these problems since it is difficult to generate valid configurations. We overcome this challenge by redefining the robot\\'s degrees of freedom and constraints into a new set of parameters, called reachable distance space (RD-space), in which all configurations lie in the set of constraint-satisfying subspaces. This enables us to directly sample the constrained subspaces with complexity linear in the number of the robot\\'s degrees of freedom. In addition to supporting efficient sampling of configurations, we show that the RD-space formulation naturally supports planning and, in particular, we design a local planner suitable for use by sampling-based planners. We demonstrate the effectiveness and efficiency of our approach for several systems including closed chain planning with multiple loops, restricted end-effector sampling, and on-line planning for drawing/sculpting. We can sample single-loop closed chain systems with 1,000 links in time comparable to open chain sampling, and we can generate samples for 1,000-link multi-loop systems of varying topologies in less than a second. © 2010 The Author(s).

  18. Sampling plans in attribute mode with multiple levels of precision

    International Nuclear Information System (INIS)

    Franklin, M.

    1986-01-01

    This paper describes a method for deriving sampling plans for nuclear material inventory verification. The method presented is different from the classical approach which envisages two levels of measurement precision corresponding to NDA and DA. In the classical approach the precisions of the two measurement methods are taken as fixed parameters. The new approach is based on multiple levels of measurement precision. The design of the sampling plan consists of choosing the number of measurement levels, the measurement precision to be used at each level and the sample size to be used at each level

  19. Technical management plan for sample generation, analysis, and data review for Phase 2 of the Clinch River Environmental Restoration Program

    International Nuclear Information System (INIS)

    Brandt, C.C.; Benson, S.B.; Beeler, D.A.

    1994-03-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. The remedial investigation is entering Phase 2, which has the following items as its objectives: define the nature and extent of the contamination in areas downstream from the DOE ORR, evaluate the human health and ecological risks posed by these contaminants, and perform preliminary identification and evaluation of potential remediation alternatives. This plan describes the requirements, responsibilities, and roles of personnel during sampling, analysis, and data review for the Clinch River Environmental Restoration Program (CR-ERP). The purpose of the plan is to formalize the process for obtaining analytical services, tracking sampling and analysis documentation, and assessing the overall quality of the CR-ERP data collection program to ensure that it will provide the necessary building blocks for the program decision-making process

  20. UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years

  1. Sampling and Analysis Plan for PUREX canyon vessel flushing

    International Nuclear Information System (INIS)

    Villalobos, C.N.

    1995-01-01

    A sampling and analysis plan is necessary to provide direction for the sampling and analytical activities determined by the data quality objectives. This document defines the sampling and analysis necessary to support the deactivation of the Plutonium-Uranium Extraction (PUREX) facility vessels that are regulated pursuant to Washington Administrative Code 173-303

  2. UMTRA water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this document is to provide background, guidance, and justification for fiscal year (FY) 1994 water sampling activities for the uranium mil tailings site at Tuba City, Arizona. This sampling and analysis plan will form the basis for groundwater sampling and analysis work orders to be implemented in FY94

  3. Visual Sample Plan (VSP) Software: Designs and Data Analyses for Sampling Contaminated Buildings

    International Nuclear Information System (INIS)

    Pulsipher, Brent A.; Wilson, John E.; Gilbert, Richard O.; Nuffer, Lisa L.; Hassig, Nancy L.

    2005-01-01

    A new module of the Visual Sample Plan (VSP) software has been developed to provide sampling designs and data analyses for potentially contaminated buildings. An important application is assessing levels of contamination in buildings after a terrorist attack. This new module, funded by DHS through the Combating Terrorism Technology Support Office, Technical Support Working Group, was developed to provide a tailored, user-friendly and visually-orientated buildings module within the existing VSP software toolkit, the latest version of which can be downloaded from http://dqo.pnl.gov/vsp. In case of, or when planning against, a chemical, biological, or radionuclide release within a building, the VSP module can be used to quickly and easily develop and visualize technically defensible sampling schemes for walls, floors, ceilings, and other surfaces to statistically determine if contamination is present, its magnitude and extent throughout the building and if decontamination has been effective. This paper demonstrates the features of this new VSP buildings module, which include: the ability to import building floor plans or to easily draw, manipulate, and view rooms in several ways; being able to insert doors, windows and annotations into a room; 3-D graphic room views with surfaces labeled and floor plans that show building zones that have separate air handing units. The paper will also discuss the statistical design and data analysis options available in the buildings module. Design objectives supported include comparing an average to a threshold when the data distribution is normal or unknown, and comparing measurements to a threshold to detect hotspots or to insure most of the area is uncontaminated when the data distribution is normal or unknown

  4. High-performance serial block-face SEM of nonconductive biological samples enabled by focal gas injection-based charge compensation.

    Science.gov (United States)

    Deerinck, T J; Shone, T M; Bushong, E A; Ramachandra, R; Peltier, S T; Ellisman, M H

    2018-05-01

    A longstanding limitation of imaging with serial block-face scanning electron microscopy is specimen surface charging. This charging is largely due to the difficulties in making biological specimens and the resins in which they are embedded sufficiently conductive. Local accumulation of charge on the specimen surface can result in poor image quality and distortions. Even minor charging can lead to misalignments between sequential images of the block-face due to image jitter. Typically, variable-pressure SEM is used to reduce specimen charging, but this results in a significant reduction to spatial resolution, signal-to-noise ratio and overall image quality. Here we show the development and application of a simple system that effectively mitigates specimen charging by using focal gas injection of nitrogen over the sample block-face during imaging. A standard gas injection valve is paired with a precisely positioned but retractable application nozzle, which is mechanically coupled to the reciprocating action of the serial block-face ultramicrotome. This system enables the application of nitrogen gas precisely over the block-face during imaging while allowing the specimen chamber to be maintained under high vacuum to maximise achievable SEM image resolution. The action of the ultramicrotome drives the nozzle retraction, automatically moving it away from the specimen area during the cutting cycle of the knife. The device described was added to a Gatan 3View system with minimal modifications, allowing high-resolution block-face imaging of even the most charge prone of epoxy-embedded biological samples. © 2017 The Authors Journal of Microscopy © 2017 Royal Microscopical Society.

  5. Nonradioactive Dangerous Waste Landfill sampling and analysis plan and data quality objectives process summary report

    International Nuclear Information System (INIS)

    Smith, R.C.

    1997-08-01

    This sampling and analysis plan defines the sampling and analytical activities and associated procedures that will be used to support the Nonradioactive Dangerous Waste Landfill soil-gas investigation. This SAP consists of three sections: this introduction, the field sampling plan, and the quality assurance project plan. The field sampling plan defines the sampling and analytical methodologies to be performed

  6. Background Information for the Nevada National Security Site Integrated Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene; Marutzky, Sam

    2014-12-01

    This document describes the process followed to develop the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan). It provides the Plan’s purpose and objectives, and briefly describes the Underground Test Area (UGTA) Activity, including the conceptual model and regulatory requirements as they pertain to groundwater sampling. Background information on other NNSS groundwater monitoring programs—the Routine Radiological Environmental Monitoring Plan (RREMP) and Community Environmental Monitoring Program (CEMP)—and their integration with the Plan are presented. Descriptions of the evaluations, comments, and responses of two Sampling Plan topical committees are also included.

  7. 105-N Basin sediment disposition phase-one sampling and analysis plan

    International Nuclear Information System (INIS)

    1997-01-01

    The sampling and analysis plan (SAP) for Phase 1 of the 105-N Basin sediment disposition project defines the sampling and analytical activities that will be performed for the engineering assessment phase (phase 1) of the project. A separate SAP defines the sampling and analytical activities that will be performed for the characterization phase (Phase 2) of the 105-N sediment disposition project. The Phase-1 SAP is presented in the introduction (Section 1.0), in the field sampling plan (FSP) (Section 2.0), and in the quality assurance project plan (QAPjP) (Section 3.0). The FSP defines the sampling and analytical methodologies to be performed. The QAPjP provides information on the quality assurance/quality control (QA/QC) parameters related to the sampling and analytical methodologies. This SAP defines the strategy and the methods that will be used to sample and analyze the sediment on the floor of the 105-N Basin. The resulting data will be used to develop and evaluate engineering designs for collecting and removing sediment from the basin

  8. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site

  9. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-01-01

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user's guide to the Data Quality Objective process, and a self-assessment checklist

  10. Sampling and Analysis Plan for the 233-S Plutonium Concentration Facility

    International Nuclear Information System (INIS)

    Mihalic, M.A.

    1998-02-01

    This Sampling and Analysis Plan (SAP) provides the information and instructions to be used for sampling and analysis activities in the 233-S Plutonium Concentration Facility. The information and instructions herein are separated into three parts and address the Data Quality Objective (DQO) Summary Report, Quality Assurance Project Plan (QAP), and SAP

  11. Tank 241-AP-104 Grab Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AP-104. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AP-104 required to provide sample material to the Waste Treatment Contractor. Grab samples will be obtained from riser 001 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives and ICD-23. The 222-S Laboratory will receive samples; composite the samples; perform chemical analyses on composite samples; and provide samples to the Waste Treatment Contractor and the Process Chemistry Laboratory. The Process Chemistry Laboratory at the 222-S Laboratory Complex will perform process tests to evaluate the behavior of the 241-AP-104 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. The Waste Treatment Contractor will perform process verification and waste form qualification tests. Requirements for analyses of samples originating in the L and H DQO process tests will be documented in the corresponding test plan (Person 2000) and are not within the scope of this SAP. This report provides the general methodology and procedures to be used in the preparation, retrieval, transport, analysis, and reporting of results from grab samples retrieved from tank 241-AP-104

  12. Comparison and Field Validation of Binomial Sampling Plans for Oligonychus perseae (Acari: Tetranychidae) on Hass Avocado in Southern California.

    Science.gov (United States)

    Lara, Jesus R; Hoddle, Mark S

    2015-08-01

    Oligonychus perseae Tuttle, Baker, & Abatiello is a foliar pest of 'Hass' avocados [Persea americana Miller (Lauraceae)]. The recommended action threshold is 50-100 motile mites per leaf, but this count range and other ecological factors associated with O. perseae infestations limit the application of enumerative sampling plans in the field. Consequently, a comprehensive modeling approach was implemented to compare the practical application of various binomial sampling models for decision-making of O. perseae in California. An initial set of sequential binomial sampling models were developed using three mean-proportion modeling techniques (i.e., Taylor's power law, maximum likelihood, and an empirical model) in combination with two-leaf infestation tally thresholds of either one or two mites. Model performance was evaluated using a robust mite count database consisting of >20,000 Hass avocado leaves infested with varying densities of O. perseae and collected from multiple locations. Operating characteristic and average sample number results for sequential binomial models were used as the basis to develop and validate a standardized fixed-size binomial sampling model with guidelines on sample tree and leaf selection within blocks of avocado trees. This final validated model requires a leaf sampling cost of 30 leaves and takes into account the spatial dynamics of O. perseae to make reliable mite density classifications for a 50-mite action threshold. Recommendations for implementing this fixed-size binomial sampling plan to assess densities of O. perseae in commercial California avocado orchards are discussed. © The Authors 2015. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  13. Energy-Aware Path Planning for UAS Persistent Sampling and Surveillance

    Science.gov (United States)

    Shaw-Cortez, Wenceslao

    The focus of this work is to develop an energy-aware path planning algorithm that maximizes UAS endurance, while performing sampling and surveillance missions in a known, stationary wind environment. The energy-aware aspect is specifically tailored to extract energy from the wind to reduce thrust use, thereby increasing aircraft endurance. Wind energy extraction is performed by static soaring and dynamic soaring. Static soaring involves using upward wind currents to increase altitude and potential energy. Dynamic soaring involves taking advantage of wind gradients to exchange potential and kinetic energy. The path planning algorithm developed in this work uses optimization to combine these soaring trajectories with the overarching sampling and surveillance mission. The path planning algorithm uses a simplified aircraft model to tractably optimize soaring trajectories. This aircraft model is presented and along with the derivation of the equations of motion. A nonlinear program is used to create the soaring trajectories based on a given optimization problem. This optimization problem is defined using a heuristic decision tree, which defines appropriate problems given a sampling and surveillance mission and a wind model. Simulations are performed to assess the path planning algorithm. The results are used to identify properties of soaring trajectories as well as to determine what wind conditions support minimal thrust soaring. Additional results show how the path planning algorithm can be tuned between maximizing aircraft endurance and performing the sampling and surveillance mission. A means of trajectory stitching is demonstrated to show how the periodic soaring segments can be combined together to provide a full solution to an infinite/long horizon problem.

  14. Test plan for core sampling drill bit temperature monitor

    International Nuclear Information System (INIS)

    Francis, P.M.

    1994-01-01

    At WHC, one of the functions of the Tank Waste Remediation System division is sampling waste tanks to characterize their contents. The push-mode core sampling truck is currently used to take samples of liquid and sludge. Sampling of tanks containing hard salt cake is to be performed with the rotary-mode core sampling system, consisting of the core sample truck, mobile exhauster unit, and ancillary subsystems. When drilling through the salt cake material, friction and heat can be generated in the drill bit. Based upon tank safety reviews, it has been determined that the drill bit temperature must not exceed 180 C, due to the potential reactivity of tank contents at this temperature. Consequently, a drill bit temperature limit of 150 C was established for operation of the core sample truck to have an adequate margin of safety. Unpredictable factors, such as localized heating, cause this buffer to be so great. The most desirable safeguard against exceeding this threshold is bit temperature monitoring . This document describes the recommended plan for testing the prototype of a drill bit temperature monitor developed for core sampling by Sandia National Labs. The device will be tested at their facilities. This test plan documents the tests that Westinghouse Hanford Company considers necessary for effective testing of the system

  15. Genesis Contingency Planning and Mishap Recovery: The Sample Curation View

    Science.gov (United States)

    Stansbery, E. K.; Allton, J. H.; Allen, C. C.; McNamara, K. M.; Calaway, M.; Rodriques, M. C.

    2007-01-01

    Planning for sample preservation and curation was part of mission design from the beginning. One of the scientific objectives for Genesis included collecting samples of three regimes of the solar wind in addition to collecting bulk solar wind during the mission. Collectors were fabricated in different thicknesses for each regime of the solar wind and attached to separate frames exposed to the solar wind during specific periods of solar activity associated with each regime. The original plan to determine the solar regime sampled for specific collectors was to identify to which frame the collector was attached. However, the collectors were dislodged during the hard landing making identification by frame attachment impossible. Because regimes were also identified by thickness of the collector, the regime sampled is identified by measuring fragment thickness. A variety of collector materials and thin films applied to substrates were selected and qualified for flight. This diversity provided elemental measurement in more than one material, mitigating effects of diffusion rates and/or radiation damage. It also mitigated against different material and substrate strengths resulting in differing effects of the hard landing. For example, silicon crystal substrates broke into smaller fragments than sapphire-based substrates and diamond surfaces were more resilient to flying debris damage than gold. The primary responsibility of the curation team for recovery was process documentation. Contingency planning for the recovery phase expanded this responsibility to include not only equipment to document, but also gather, contain and identify samples from the landing area and the recovered spacecraft. The team developed contingency plans for various scenarios as part of mission planning that included topographic maps to aid in site recovery and identification of different modes of transport and purge capability depending on damage. A clean tent, set-up at Utah Test & Training Range

  16. Tank 241-U-105 push mode core sampling and analysis plan

    International Nuclear Information System (INIS)

    Bell, K.E.

    1995-01-01

    This Sampling and Analysis Plan (SAP) will identify characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples and two push mode core samples from tank 241-U-105 (U-105)

  17. Sampling and analysis plan for the 100-D Ponds voluntary remediation project

    International Nuclear Information System (INIS)

    1996-08-01

    This Sampling and Analysis Plan (SAP) describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds Resource Conservation and Recovery Act (RCRA) treatment, storage, and/or disposal (TSD) unit. This SAP includes the Field Sampling Plan (FSP) presented in Section 2.0, and the Quality Assurance Project Plan (QAPjP) described in Section 3.0. The FSP defines the sampling and analytical methodologies to be performed, and the QAPjP provides or includes information on the requirements for precision, accuracy, representativeness, comparability, and completeness of the analytical data. This sampling and analysis plan was developed using the Environmental Protection Agency's Seven-Step Data Quality Objectives (DQO) Guidance (EPA, 1994). The purpose of the DQO meetings was (1) to identify the contaminants of concern and their cleanup levels under the Washington State Model Toxics Control Act (MTCA, WAC-173-340) Method B, and (2) to determine the number and locations of samples necessary to verify that the 100-D Ponds meet the cleanup criteria. The data collected will be used to support RCRA closure of this TSD unit

  18. Evaluation of sampling plans for in-service inspection of steam generator tubes

    International Nuclear Information System (INIS)

    Kurtz, R.J.; Heasler, P.G.; Baird, D.B.

    1994-02-01

    This report summarizes the results of three previous studies to evaluate and compare the effectiveness of sampling plans for steam generator tube inspections. An analytical evaluation and Monte Carlo simulation techniques were the methods used to evaluate sampling plan performance. To test the performance of candidate sampling plans under a variety of conditions, ranges of inspection system reliability were considered along with different distributions of tube degradation. Results from the eddy current reliability studies performed with the retired-from-service Surry 2A steam generator were utilized to guide the selection of appropriate probability of detection and flaw sizing models for use in the analysis. Different distributions of tube degradation were selected to span the range of conditions that might exist in operating steam generators. The principal means of evaluating sampling performance was to determine the effectiveness of the sampling plan for detecting and plugging defective tubes. A summary of key results from the eddy current reliability studies is presented. The analytical and Monte Carlo simulation analyses are discussed along with a synopsis of key results and conclusions

  19. Sampling and Analysis Plan for the 221-U Facility

    International Nuclear Information System (INIS)

    Rugg, J.E.

    1998-02-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed to be conducted to support the evaluation of alternatives for the final disposition of the 221-U Facility. This SAP will describe general sample locations and the minimum number of samples required. It will also identify the specific contaminants of potential concern (COPCs) and the required analysis. This SAP does not define the exact sample locations and equipment to be used in the field due to the nature of unknowns associated with the 221-U Facility

  20. Acceptance Sampling Plans Based on Truncated Life Tests for Sushila Distribution

    Directory of Open Access Journals (Sweden)

    Amer Ibrahim Al-Omari

    2018-03-01

    Full Text Available An acceptance sampling plan problem based on truncated life tests when the lifetime following a Sushila distribution is considered in this paper. For various acceptance numbers, confidence levels and values of the ratio between fixed experiment time and particular mean lifetime, the minimum sample sizes required to ascertain a specified mean life were found. The operating characteristic function values of the suggested sampling plans and the producer’s risk are presented. Some tables are provided and the results are illustrated by an example of a real data set.

  1. In situ sampling cart development engineering task plan

    International Nuclear Information System (INIS)

    DeFord, D.K.

    1995-01-01

    This Engineering Task Plan (ETP) supports the development for facility use of the next generation in situ sampling system for characterization of tank vapors. In situ sampling refers to placing sample collection devices (primarily sorbent tubes) directly into the tank headspace, then drawing tank gases through the collection devices to obtain samples. The current in situ sampling system is functional but was not designed to provide the accurate flow measurement required by today's data quality objectives (DQOs) for vapor characterization. The new system will incorporate modern instrumentation to achieve much tighter control. The next generation system will be referred to in this ETP as the New In Situ System (NISS) or New System. The report describes the current sampling system and the modifications that are required for more accuracy

  2. The wild tapered block bootstrap

    DEFF Research Database (Denmark)

    Hounyo, Ulrich

    In this paper, a new resampling procedure, called the wild tapered block bootstrap, is introduced as a means of calculating standard errors of estimators and constructing confidence regions for parameters based on dependent heterogeneous data. The method consists in tapering each overlapping block...... of the series first, the applying the standard wild bootstrap for independent and heteroscedastic distrbuted observations to overlapping tapered blocks in an appropriate way. Its perserves the favorable bias and mean squared error properties of the tapered block bootstrap, which is the state-of-the-art block......-order asymptotic validity of the tapered block bootstrap as well as the wild tapered block bootstrap approximation to the actual distribution of the sample mean is also established when data are assumed to satisfy a near epoch dependent condition. The consistency of the bootstrap variance estimator for the sample...

  3. Sampling Plans for the Thrips Frankliniella schultzei (Thysanoptera: Thripidae) in Three Lettuce Varieties.

    Science.gov (United States)

    Silva, Alisson R; Rodrigues-Silva, Nilson; Pereira, Poliana S; Sarmento, Renato A; Costa, Thiago L; Galdino, Tarcísio V S; Picanço, Marcelo C

    2017-12-05

    The common blossom thrips, Frankliniella schultzei Trybom (Thysanoptera: Thripidae), is an important lettuce pest worldwide. Conventional sampling plans are the first step in implementing decision-making systems into integrated pest management programs. However, this tool is not available for F. schultzei infesting lettuce crops. Thus, the objective of this work was to develop a conventional sampling plan for F. schultzei in lettuce crops. Two sampling techniques (direct counting and leaf beating on a white plastic tray) were compared in crisphead, looseleaf, and Boston lettuce varieties before and during head formation. The frequency distributions of F. schultzei densities in lettuce crops were assessed, and the number of samples required to compose the sampling plan was determined. Leaf beating on a white plastic tray was the best sampling technique. F. schultzei densities obtained with this technique were fitted to the negative binomial distribution with a common aggregation parameter (common K = 0.3143). The developed sampling plan is composed of 91 samples per field and presents low errors in its estimates (up to 20%), fast execution time (up to 47 min), and low cost (up to US $1.67 per sampling area). This sampling plan can be used as a tool for integrated pest management in lettuce crops, assisting with reliable decision making in different lettuce varieties before and during head formation. © The Author(s) 2017. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  4. Group SkSP-R sampling plan for accelerated life tests

    Indian Academy of Sciences (India)

    Muhammad Aslam

    2017-09-15

    Sep 15, 2017 ... SkSP-R sampling; life test; Weibull distribution; producer's risk; ... designed a sampling plan under a time-truncated life test .... adjusted using an acceleration factor. ... where P is the probability of lot acceptance for a single.

  5. Designing a two-rank acceptance sampling plan for quality inspection of geospatial data products

    Science.gov (United States)

    Tong, Xiaohua; Wang, Zhenhua; Xie, Huan; Liang, Dan; Jiang, Zuoqin; Li, Jinchao; Li, Jun

    2011-10-01

    To address the disadvantages of classical sampling plans designed for traditional industrial products, we originally propose a two-rank acceptance sampling plan (TRASP) for the inspection of geospatial data outputs based on the acceptance quality level (AQL). The first rank sampling plan is to inspect the lot consisting of map sheets, and the second is to inspect the lot consisting of features in an individual map sheet. The TRASP design is formulated as an optimization problem with respect to sample size and acceptance number, which covers two lot size cases. The first case is for a small lot size with nonconformities being modeled by a hypergeometric distribution function, and the second is for a larger lot size with nonconformities being modeled by a Poisson distribution function. The proposed TRASP is illustrated through two empirical case studies. Our analysis demonstrates that: (1) the proposed TRASP provides a general approach for quality inspection of geospatial data outputs consisting of non-uniform items and (2) the proposed acceptance sampling plan based on TRASP performs better than other classical sampling plans. It overcomes the drawbacks of percent sampling, i.e., "strictness for large lot size, toleration for small lot size," and those of a national standard used specifically for industrial outputs, i.e., "lots with different sizes corresponding to the same sampling plan."

  6. An Internationally Coordinated Science Management Plan for Samples Returned from Mars

    Science.gov (United States)

    Haltigin, T.; Smith, C. L.

    2015-12-01

    Mars Sample Return (MSR) remains a high priority of the planetary exploration community. Such an effort will undoubtedly be too large for any individual agency to conduct itself, and thus will require extensive global cooperation. To help prepare for an eventual MSR campaign, the International Mars Exploration Working Group (IMEWG) chartered the international Mars Architecture for the Return of Samples (iMARS) Phase II working group in 2014, consisting of representatives from 17 countries and agencies. The overarching task of the team was to provide recommendations for progressing towards campaign implementation, including a proposed science management plan. Building upon the iMARS Phase I (2008) outcomes, the Phase II team proposed the development of an International MSR Science Institute as part of the campaign governance, centering its deliberations around four themes: Organization: including an organizational structure for the Institute that outlines roles and responsibilities of key members and describes sample return facility requirements; Management: presenting issues surrounding scientific leadership, defining guidelines and assumptions for Institute membership, and proposing a possible funding model; Operations & Data: outlining a science implementation plan that details the preliminary sample examination flow, sample allocation process, and data policies; and Curation: introducing a sample curation plan that comprises sample tracking and routing procedures, sample sterilization considerations, and long-term archiving recommendations. This work presents a summary of the group's activities, findings, and recommendations, highlighting the role of international coordination in managing the returned samples.

  7. Sampling plan to support HLW tank 16

    International Nuclear Information System (INIS)

    Rodwell, P.O.; Martin, B.

    1997-01-01

    Plans are to remove the residual waste from the annulus of High-Level Waste Tank 16, located in the H-Area Tank Farm, in 1998. The interior of the tank is virtually clean. In the late 1970's, the waste was removed from the interior of the tank by several campaigns of waste removal with slurry pumps, spray washing, and oxalic acid cleaning. The annulus of the tank at one time had several thousand gallons of waste salt, which had leaked from the tank interior. Some of this salt was removed by adding water to the annulus and circulating, but much of the salt remains in the annulus. In order to confirm the source term used for fate and transport modeling, samples of the tank interior and annulus will be obtained and analyzed. If the results of the analyses indicate that the data used for the initial modeling is bounding then no changes will be made to the model. However, if the results indicate that the source term is higher than that assumed in the initial modeling, thus not bounding, additional modeling will be performed. The purpose of this Plan is to outline the approach to sampling the annulus and interior of Tank 16 as a prerequisite to salt removal in the annulus and closure of the entire tank system. The sampling and analysis of this tank system must be robust to reasonably ensure the actual tank residual is within the bounds of analysis error

  8. Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102

  9. Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    RASMUSSEN, J.H.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102

  10. Abbreviated sampling and analysis plan for planning decontamination and decommissioning at Test Reactor Area (TRA) facilities

    International Nuclear Information System (INIS)

    1994-10-01

    The objective is to sample and analyze for the presence of gamma emitting isotopes and hazardous constituents within certain areas of the Test Reactor Area (TRA), prior to D and D activities. The TRA is composed of three major reactor facilities and three smaller reactors built in support of programs studying the performance of reactor materials and components under high neutron flux conditions. The Materials Testing Reactor (MTR) and Engineering Test Reactor (ETR) facilities are currently pending D/D. Work consists of pre-D and D sampling of designated TRA (primarily ETR) process areas. This report addresses only a limited subset of the samples which will eventually be required to characterize MTR and ETR and plan their D and D. Sampling which is addressed in this document is intended to support planned D and D work which is funded at the present time. Biased samples, based on process knowledge and plant configuration, are to be performed. The multiple process areas which may be potentially sampled will be initially characterized by obtaining data for upstream source areas which, based on facility configuration, would affect downstream and as yet unsampled, process areas. Sampling and analysis will be conducted to determine the level of gamma emitting isotopes and hazardous constituents present in designated areas within buildings TRA-612, 642, 643, 644, 645, 647, 648, 663; and in the soils surrounding Facility TRA-611. These data will be used to plan the D and D and help determine disposition of material by D and D personnel. Both MTR and ETR facilities will eventually be decommissioned by total dismantlement so that the area can be restored to its original condition

  11. IP Sample Plan #5 | NCI Technology Transfer Center | TTC

    Science.gov (United States)

    A sample Intellectual Property Management Plan in the form of a legal agreement between a University and its collaborators which addresses data sharing, sharing of research tools and resources and intellectual property management.

  12. Test plan for evaluating the performance of the in-tank fluidic sampling system

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    The PHMC will provide Low Activity Wastes (LAW) tank wastes for final treatment by a privatization contractor from double-shell feed tanks, 241-AP-102 and 241-AP-104, Concerns about the inability of the baseline ''grab'' sampling to provide large volume samples within time constraints has led to the development of a conceptual sampling system that would be deployed in a feed tank riser, This sampling system will provide large volume, representative samples without the environmental, radiation exposure, and sample volume impacts of the current base-line ''grab'' sampling method. This test plan identifies ''proof-of-principle'' cold tests for the conceptual sampling system using simulant materials. The need for additional testing was identified as a result of completing tests described in the revision test plan document, Revision 1 outlines tests that will evaluate the performance and ability to provide samples that are representative of a tanks' content within a 95 percent confidence interval, to recovery from plugging, to sample supernatant wastes with over 25 wt% solids content, and to evaluate the impact of sampling at different heights within the feed tank. The test plan also identifies operating parameters that will optimize the performance of the sampling system

  13. Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan; FINAL

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AZ-102. Push mode core samples will be obtained from risers 15C and 24A to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples, composite the liquids and solids, perform chemical analyses, and provide subsamples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AZ-102 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plan

  14. Soil Sampling Plan for the transuranic storage area soil overburden and final report: Soil overburden sampling at the RWMC transuranic storage area

    International Nuclear Information System (INIS)

    Stanisich, S.N.

    1994-12-01

    This Soil Sampling Plan (SSP) has been developed to provide detailed procedural guidance for field sampling and chemical and radionuclide analysis of selected areas of soil covering waste stored at the Transuranic Storage Area (TSA) at the Idaho National Engineering Laboratory's (INEL) Radioactive Waste Management Complex (RWMC). The format and content of this SSP represents a complimentary hybrid of INEL Waste Management--Environmental Restoration Program, and Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation/Feasibility Study (RI/FS) sampling guidance documentation. This sampling plan also functions as a Quality Assurance Project Plan (QAPP). The QAPP as a controlling mechanism during sampling to ensure that all data collected are valid, reliabile, and defensible. This document outlines organization, objectives and quality assurance/quality control (QA/QC) activities to achieve the desired data quality goals. The QA/QC requirements for this project are outlined in the Data Collection Quality Assurance Plan (DCQAP) for the Buried Waste Program. The DCQAP is a program plan and does not outline the site specific requirements for the scope of work covered by this SSP

  15. Spatial distribution and sequential sampling plans for Tuta absoluta (Lepidoptera: Gelechiidae) in greenhouse tomato crops.

    Science.gov (United States)

    Cocco, Arturo; Serra, Giuseppe; Lentini, Andrea; Deliperi, Salvatore; Delrio, Gavino

    2015-09-01

    The within- and between-plant distribution of the tomato leafminer, Tuta absoluta (Meyrick), was investigated in order to define action thresholds based on leaf infestation and to propose enumerative and binomial sequential sampling plans for pest management applications in protected crops. The pest spatial distribution was aggregated between plants, and median leaves were the most suitable sample to evaluate the pest density. Action thresholds of 36 and 48%, 43 and 56% and 60 and 73% infested leaves, corresponding to economic thresholds of 1 and 3% damaged fruits, were defined for tomato cultivars with big, medium and small fruits respectively. Green's method was a more suitable enumerative sampling plan as it required a lower sampling effort. Binomial sampling plans needed lower average sample sizes than enumerative plans to make a treatment decision, with probabilities of error of sampling plan required 87 or 343 leaves to estimate the population density in extensive or intensive ecological studies respectively. Binomial plans would be more practical and efficient for control purposes, needing average sample sizes of 17, 20 and 14 leaves to take a pest management decision in order to avoid fruit damage higher than 1% in cultivars with big, medium and small fruits respectively. © 2014 Society of Chemical Industry.

  16. Assessment of the dentoskeletal changes following the use of twin-block functional appliance and inclined anterior bite plan in the patients with class II malocclusion div 1 in 11-14 years old

    Directory of Open Access Journals (Sweden)

    Allahyar Geramy

    2015-12-01

    Full Text Available Background and Aims: Cl II malocclusion is one of the most common abnormalities in human societies and using a simple, affordable and accessible treatment that can be provided by general practitioners or specialists, to prevent future malocclusion complications is vital. Cl II malocclusion treatment using functional appliances such as twin block and anterior inclined bite plan have less cost, side effects and complications compared to fixed orthodontic or orthosurgery. Until now, the dentoskeletal changes resulting from the application of twin block and anterior inclined bite plan in patients with Class II malocclusion has not been evaluated. The objective of the present study was to assess the dentoskeletal changes following the use of twin-block functional appliance and inclined anterior bite plan in the patients with class II malocclusion div 1 during mixed dentition. Materials and Methods: In this retrospective cohort trial, 60 patients with the definitive diagnosis of Class II div. 1 malocclusion having ANB>2 and FMA angel between 20 and 30 and without any previous treatment or syndrome who were treated with twin-block or inclined anterior bite plan appliance were selected and their lateral cephalometries were traced before and after treatment. Selected distance and angular landmarks were measured on the cephalograms with the good reliability (ICC=0.953 and the changes occurred in the landmarks were statistically analyzed using Student t test. Results: Due to the increased mandibular growth, most of the landmarks experienced significant changes following the treatment with twin-block and inclined bite plan (P0.05, however, SNA (P=0.04, overjet (P=0.007 and wits appraisal (P=0.004 changed differently after using the appliances. Conclusion: Despite with most similarities of both twin-block and anterior inclined bite plan to correct class II div. 1 malocclusion, Due to the advantages of anterior inclined bite plan such as less size, good

  17. Visual Sample Plan (VSP) - FIELDS Integration

    Energy Technology Data Exchange (ETDEWEB)

    Pulsipher, Brent A.; Wilson, John E.; Gilbert, Richard O.; Hassig, Nancy L.; Carlson, Deborah K.; Bing-Canar, John; Cooper, Brian; Roth, Chuck

    2003-04-19

    Two software packages, VSP 2.1 and FIELDS 3.5, are being used by environmental scientists to plan the number and type of samples required to meet project objectives, display those samples on maps, query a database of past sample results, produce spatial models of the data, and analyze the data in order to arrive at defensible decisions. VSP 2.0 is an interactive tool to calculate optimal sample size and optimal sample location based on user goals, risk tolerance, and variability in the environment and in lab methods. FIELDS 3.0 is a set of tools to explore the sample results in a variety of ways to make defensible decisions with quantified levels of risk and uncertainty. However, FIELDS 3.0 has a small sample design module. VSP 2.0, on the other hand, has over 20 sampling goals, allowing the user to input site-specific assumptions such as non-normality of sample results, separate variability between field and laboratory measurements, make two-sample comparisons, perform confidence interval estimation, use sequential search sampling methods, and much more. Over 1,000 copies of VSP are in use today. FIELDS is used in nine of the ten U.S. EPA regions, by state regulatory agencies, and most recently by several international countries. Both software packages have been peer-reviewed, enjoy broad usage, and have been accepted by regulatory agencies as well as site project managers as key tools to help collect data and make environmental cleanup decisions. Recently, the two software packages were integrated, allowing the user to take advantage of the many design options of VSP, and the analysis and modeling options of FIELDS. The transition between the two is simple for the user – VSP can be called from within FIELDS, automatically passing a map to VSP and automatically retrieving sample locations and design information when the user returns to FIELDS. This paper will describe the integration, give a demonstration of the integrated package, and give users download

  18. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    International Nuclear Information System (INIS)

    2012-01-01

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the

  19. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the

  20. A high-pressure thermal gradient block for investigating microbial activity in multiple deep-sea samples

    DEFF Research Database (Denmark)

    Kallmeyer, J.; Ferdelman, TG; Jansen, KH

    2003-01-01

    Details about the construction and use of a high-pressure thermal gradient block for the simultaneous incubation of multiple samples are presented. Most parts used are moderately priced off-the-shelf components that easily obtainable. In order to keep the pressure independent of thermal expansion....... Sulfate reduction rates increase with increasing pressure and show maximum values at pressures higher than in situ. (C) 2003 Elsevier Science B.V. All rights reserved....

  1. Sequential Sampling Plan of Anthonomus grandis (Coleoptera: Curculionidae) in Cotton Plants.

    Science.gov (United States)

    Grigolli, J F J; Souza, L A; Mota, T A; Fernandes, M G; Busoli, A C

    2017-04-01

    The boll weevil, Anthonomus grandis grandis Boheman (Coleoptera: Curculionidae), is one of the most important pests of cotton production worldwide. The objective of this work was to develop a sequential sampling plan for the boll weevil. The studies were conducted in Maracaju, MS, Brazil, in two seasons with cotton cultivar FM 993. A 10,000-m2 area of cotton was subdivided into 100 of 10- by 10-m plots, and five plants per plot were evaluated weekly, recording the number of squares with feeding + oviposition punctures of A. grandis in each plant. A sequential sampling plan by the maximum likelihood ratio test was developed, using a 10% threshold level of squares attacked. A 5% security level was adopted for the elaboration of the sequential sampling plan. The type I and type II error used was 0.05, recommended for studies with insects. The adjustment of the frequency distributions used were divided into two phases, so that the model that best fit to the data was the negative binomial distribution up to 85 DAE (Phase I), and from there the best fit was Poisson distribution (Phase II). The equations that define the decision-making for Phase I are S0 = -5.1743 + 0.5730N and S1 = 5.1743 + 0.5730N, and for the Phase II are S0 = -4.2479 + 0.5771N and S1 = 4.2479 + 0.5771N. The sequential sampling plan developed indicated the maximum number of sample units expected for decision-making is ∼39 and 31 samples for Phases I and II, respectively. © The Authors 2017. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  2. Minimum description length block finder, a method to identify haplotype blocks and to compare the strength of block boundaries.

    Science.gov (United States)

    Mannila, H; Koivisto, M; Perola, M; Varilo, T; Hennah, W; Ekelund, J; Lukk, M; Peltonen, L; Ukkonen, E

    2003-07-01

    We describe a new probabilistic method for finding haplotype blocks that is based on the use of the minimum description length (MDL) principle. We give a rigorous definition of the quality of a segmentation of a genomic region into blocks and describe a dynamic programming algorithm for finding the optimal segmentation with respect to this measure. We also describe a method for finding the probability of a block boundary for each pair of adjacent markers: this gives a tool for evaluating the significance of each block boundary. We have applied the method to the published data of Daly and colleagues. The results expose some problems that exist in the current methods for the evaluation of the significance of predicted block boundaries. Our method, MDL block finder, can be used to compare block borders in different sample sets, and we demonstrate this by applying the MDL-based method to define the block structure in chromosomes from population isolates.

  3. A scalable method for parallelizing sampling-based motion planning algorithms

    KAUST Repository

    Jacobs, Sam Ade; Manavi, Kasra; Burgos, Juan; Denny, Jory; Thomas, Shawna; Amato, Nancy M.

    2012-01-01

    This paper describes a scalable method for parallelizing sampling-based motion planning algorithms. It subdivides configuration space (C-space) into (possibly overlapping) regions and independently, in parallel, uses standard (sequential) sampling-based planners to construct roadmaps in each region. Next, in parallel, regional roadmaps in adjacent regions are connected to form a global roadmap. By subdividing the space and restricting the locality of connection attempts, we reduce the work and inter-processor communication associated with nearest neighbor calculation, a critical bottleneck for scalability in existing parallel motion planning methods. We show that our method is general enough to handle a variety of planning schemes, including the widely used Probabilistic Roadmap (PRM) and Rapidly-exploring Random Trees (RRT) algorithms. We compare our approach to two other existing parallel algorithms and demonstrate that our approach achieves better and more scalable performance. Our approach achieves almost linear scalability on a 2400 core LINUX cluster and on a 153,216 core Cray XE6 petascale machine. © 2012 IEEE.

  4. A scalable method for parallelizing sampling-based motion planning algorithms

    KAUST Repository

    Jacobs, Sam Ade

    2012-05-01

    This paper describes a scalable method for parallelizing sampling-based motion planning algorithms. It subdivides configuration space (C-space) into (possibly overlapping) regions and independently, in parallel, uses standard (sequential) sampling-based planners to construct roadmaps in each region. Next, in parallel, regional roadmaps in adjacent regions are connected to form a global roadmap. By subdividing the space and restricting the locality of connection attempts, we reduce the work and inter-processor communication associated with nearest neighbor calculation, a critical bottleneck for scalability in existing parallel motion planning methods. We show that our method is general enough to handle a variety of planning schemes, including the widely used Probabilistic Roadmap (PRM) and Rapidly-exploring Random Trees (RRT) algorithms. We compare our approach to two other existing parallel algorithms and demonstrate that our approach achieves better and more scalable performance. Our approach achieves almost linear scalability on a 2400 core LINUX cluster and on a 153,216 core Cray XE6 petascale machine. © 2012 IEEE.

  5. Spatial Distribution and Sampling Plans for Grapevine Plant Canopy-Inhabiting Scaphoideus titanus (Hemiptera: Cicadellidae) Nymphs.

    Science.gov (United States)

    Rigamonti, Ivo E; Brambilla, Carla; Colleoni, Emanuele; Jermini, Mauro; Trivellone, Valeria; Baumgärtner, Johann

    2016-04-01

    The paper deals with the study of the spatial distribution and the design of sampling plans for estimating nymph densities of the grape leafhopper Scaphoideus titanus Ball in vine plant canopies. In a reference vineyard sampled for model parameterization, leaf samples were repeatedly taken according to a multistage, stratified, random sampling procedure, and data were subjected to an ANOVA. There were no significant differences in density neither among the strata within the vineyard nor between the two strata with basal and apical leaves. The significant differences between densities on trunk and productive shoots led to the adoption of two-stage (leaves and plants) and three-stage (leaves, shoots, and plants) sampling plans for trunk shoots- and productive shoots-inhabiting individuals, respectively. The mean crowding to mean relationship used to analyze the nymphs spatial distribution revealed aggregated distributions. In both the enumerative and the sequential enumerative sampling plans, the number of leaves of trunk shoots, and of leaves and shoots of productive shoots, was kept constant while the number of plants varied. In additional vineyards data were collected and used to test the applicability of the distribution model and the sampling plans. The tests confirmed the applicability 1) of the mean crowding to mean regression model on the plant and leaf stages for representing trunk shoot-inhabiting distributions, and on the plant, shoot, and leaf stages for productive shoot-inhabiting nymphs, 2) of the enumerative sampling plan, and 3) of the sequential enumerative sampling plan. In general, sequential enumerative sampling was more cost efficient than enumerative sampling.

  6. Sampling and Analysis Plan for K Basins Debris

    International Nuclear Information System (INIS)

    WESTCOTT, J.L.

    2000-01-01

    This Sampling and Analysis Plan presents the rationale and strategy for sampling and analysis activities to support removal of debris from the K-East and K-West Basins located in the 100K Area at the Hanford Site. This project is focused on characterization to support waste designation for disposal of waste at the Environmental Restoration Disposal Facility (ERDF). This material has previously been dispositioned at the Hanford Low-Level Burial Grounds or Central Waste Complex. The structures that house the basins are classified as radioactive material areas. Therefore, all materials removed from the buildings are presumed to be radioactively contaminated. Because most of the materials that will be addressed under this plan will be removed from the basins, and because of the cost associated with screening materials for release, it is anticipated that all debris will be managed as low-level waste. Materials will be surveyed, however, to estimate radionuclide content for disposal and to determine that the debris is not contaminated with levels of transuranic radionuclides that would designate the debris as transuranic waste

  7. Sampling and Analysis Plan for the 216-A-29 Ditch

    International Nuclear Information System (INIS)

    Petersen, S.W.

    1998-06-01

    This sampling and analysis plan defines procedures to be used for collecting and handling samples to be obtained from the 216-A-29 Ditch, and identifies requirements for field and laboratory measurements. The sampling strategy describes here is derived from a Data Quality Objectives workshop conducted in January 1997 to support sampling to assure worker safety during construction and to assess the validity of a 1988 ditch sampling campaign and the effectiveness of subsequent stabilization. The purpose of the proposed sampling and analysis activities is to characterize soil contamination in the vicinity of a proposed road over the 216-A-29 Ditch

  8. Sampling and analysis plan for the former Atomic Energy Commission bus lot property

    International Nuclear Information System (INIS)

    Nielson, R.R.

    1998-07-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed in support of an initial investigation of the former Atomic Energy Commission (AEC) bus lot property currently owned by Battelle Memorial Institute. The purpose of the proposed sampling and analysis activity is to investigate the potential for contamination above established action levels. The SAP will provide defensible data of sufficient quality and quantity to support recommendations of whether any further action within the study area is warranted. To assist in preparing sampling plans and reports, the Washington State Department of Ecology (Ecology) has published Guidance on Sampling and Data Analysis Methods. To specifically address sampling plans for petroleum-contaminated sites, Ecology has also published Guidance for Remediation of Petroleum Contaminated Sites. Both documents were used as guidance in preparing this plan. In 1992, a soil sample was taken within the current study area as part of a project to remove two underground storage tanks (USTs) at Battelle's Sixth Street Warehouse Petroleum Dispensing Station (Section 1.3). The results showed that the sample contained elevated levels of total petroleum hydrocarbons (TPH) in the heavy distillate range. This current study was initiated in part as a result of that discovery. The following topics are considered: the historical background of the site, current site conditions, previous investigations performed at the site, an evaluation based on the available data, and the contaminants of potential concern (COPC)

  9. Sampling and analysis plan for the former Atomic Energy Commission bus lot property

    Energy Technology Data Exchange (ETDEWEB)

    Nielson, R.R.

    1998-07-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed in support of an initial investigation of the former Atomic Energy Commission (AEC) bus lot property currently owned by Battelle Memorial Institute. The purpose of the proposed sampling and analysis activity is to investigate the potential for contamination above established action levels. The SAP will provide defensible data of sufficient quality and quantity to support recommendations of whether any further action within the study area is warranted. To assist in preparing sampling plans and reports, the Washington State Department of Ecology (Ecology) has published Guidance on Sampling and Data Analysis Methods. To specifically address sampling plans for petroleum-contaminated sites, Ecology has also published Guidance for Remediation of Petroleum Contaminated Sites. Both documents were used as guidance in preparing this plan. In 1992, a soil sample was taken within the current study area as part of a project to remove two underground storage tanks (USTs) at Battelle`s Sixth Street Warehouse Petroleum Dispensing Station (Section 1.3). The results showed that the sample contained elevated levels of total petroleum hydrocarbons (TPH) in the heavy distillate range. This current study was initiated in part as a result of that discovery. The following topics are considered: the historical background of the site, current site conditions, previous investigations performed at the site, an evaluation based on the available data, and the contaminants of potential concern (COPC).

  10. IP Sample Plan #1 | NCI Technology Transfer Center | TTC

    Science.gov (United States)

    Sample letter that shows how Universities including co-investigators, consultants, and collaborators can describe a data and research tool sharing plan and procedures for exercising intellectual property rights. The letter is to be used as part of the University's application. 

  11. Visual Sample Plan Version 7.0 User's Guide

    Energy Technology Data Exchange (ETDEWEB)

    Matzke, Brett D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Newburn, Lisa LN [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hathaway, John E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bramer, Lisa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wilson, John E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Dowson, Scott T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sego, Landon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pulsipher, Brent A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-03-01

    User's guide for VSP 7.0 This user's guide describes Visual Sample Plan (VSP) Version 7.0 and provides instructions for using the software. VSP selects the appropriate number and location of environmental samples to ensure that the results of statistical tests performed to provide input to risk decisions have the required confidence and performance. VSP Version 7.0 provides sample-size equations or algorithms needed by specific statistical tests appropriate for specific environmental sampling objectives. It also provides data quality assessment and statistical analysis functions to support evaluation of the data and determine whether the data support decisions regarding sites suspected of contamination. The easy-to-use program is highly visual and graphic. VSP runs on personal computers with Microsoft Windows operating systems (XP, Vista, Windows 7, and Windows 8). Designed primarily for project managers and users without expertise in statistics, VSP is applicable to two- and three-dimensional populations to be sampled (e.g., rooms and buildings, surface soil, a defined layer of subsurface soil, water bodies, and other similar applications) for studies of environmental quality. VSP is also applicable for designing sampling plans for assessing chem/rad/bio threat and hazard identification within rooms and buildings, and for designing geophysical surveys for unexploded ordnance (UXO) identification.

  12. Ground-water sample collection and analysis plan for the ground-water surveillance project

    International Nuclear Information System (INIS)

    Bryce, R.W.; Evans, J.C.; Olsen, K.B.

    1991-12-01

    The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy's (DOE's) Hanford Site in support of DOE's environmental surveillance responsibilities. The purpose of this document is to translate DOE's General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives

  13. Liquid effluent Sampling and Analysis Plan (SAP) implementation summary report

    International Nuclear Information System (INIS)

    Lueck, K.J.

    1995-01-01

    This report summarizes liquid effluent analytical data collected during the Sampling and Analysis Plan (SAP) Implementation Program, evaluates whether or not the sampling performed meets the requirements of the individual SAPs, compares the results to the WAC 173-200 Ground Water Quality Standards. Presented in the report are results from liquid effluent samples collected (1992-1994) from 18 of the 22 streams identified in the Consent Order (No. DE 91NM-177) requiring SAPs

  14. Planning Considerations Related to Collecting and Analyzing Samples of the Martian Soils

    Science.gov (United States)

    Liu, Yang; Mellon, Mike T.; Ming, Douglas W.; Morris, Richard V.; Noble, Sarah K.; Sullivan, Robert J.; Taylor, Lawrence A.; Beaty, David W.

    2014-01-01

    The Mars Sample Return (MSR) End-to-End International Science Analysis Group (E2E-iSAG [1]) established scientific objectives associ-ated with Mars returned-sample science that require the return and investigation of one or more soil samples. Soil is defined here as loose, unconsolidated materials with no implication for the presence or absence of or-ganic components. The proposed Mars 2020 (M-2020) rover is likely to collect and cache soil in addition to rock samples [2], which could be followed by future sample retrieval and return missions. Here we discuss key scientific consid-erations for sampling and caching soil samples on the proposed M-2020 rover, as well as the state in which samples would need to be preserved when received by analysts on Earth. We are seeking feedback on these draft plans as input to mission requirement formulation. A related planning exercise on rocks is reported in an accompanying abstract [3].

  15. IP Sample Plan #3 | NCI Technology Transfer Center | TTC

    Science.gov (United States)

    Sample Research Resources and Intellectual Property Plan for use by an Institution and its Collaborators for intellectual property protection strategies covering pre-existing intellectual property, agreements with commercial sources, privacy, and licensing.  | [google6f4cd5334ac394ab.html

  16. UMTRA Project water sampling and analysis plan, Canonsburg, Pennsylvania. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Surface remedial action was completed at the US Department of Energy (DOE) Canonsburg and Burrell Uranium Mill Tailings Remedial Action (UMTRA) Project sites in southwestern Pennsylvania in 1985 and 1987, respectively. The Burrell disposal site, included in the UMTRA Project as a vicinity property, was remediated in conjunction with the remedial action at Canonsburg. On 27 May 1994, the Nuclear Regulatory Commission (NRC) accepted the DOE final Long-Term Surveillance Plan (LTSP) (DOE, 1993) for Burrell thus establishing the site under the general license in 10 CFR section 40.27 (1994). In accordance with the DOE guidance document for long-term surveillance (DOE, 1995), all NRC/DOE interaction on the Burrell site's long-term care now is conducted with the DOE Grand Junction Projects Office in Grand Junction, Colorado, and is no longer the responsibility of the DOE UMTRA Project Team in Albuquerque, New Mexico. Therefore, the planned sampling activities described in this water sampling and analysis plan (WSAP) are limited to the Canonsburg site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring at the Canonsburg site for calendar years 1995 and 1996. Currently, the analytical data further the site characterization and demonstrate that the disposal cell's initial performance is in accordance with design requirements

  17. Sampling and analysis plan for Wayne Interim Storage Site (WISS), Wayne, New Jersey

    International Nuclear Information System (INIS)

    Brown, K.S.; Murray, M.E.; Rodriguez, R.E.

    1998-10-01

    This field sampling plan describes the methodology to perform an independent radiological verification survey and chemical characterization of a remediated area of the subpile at the Wayne Interim Storage Site, Wayne, New Jersey.Data obtained from collection and analysis of systematic and biased soil samples will be used to assess the status of remediation at the site and verify the final radiological status. The objective of this plan is to describe the methods for obtaining sufficient and valid measurements and analytical data to supplement and verify a radiological profile already established by the Project Remediation Management Contractor (PMC). The plan describes the procedure for obtaining sufficient and valid analytical data on soil samples following remediation of the first layer of the subpile. Samples will be taken from an area of the subpile measuring approximately 30 m by 80 m from which soil has been excavated to a depth of approximately 20 feet to confirm that the soil beneath the excavated area does not exceed radiological guidelines established for the site or chemical regulatory limits for inorganic metals. After the WISS has been fully remediated, the Department of Energy will release it for industrial/commercial land use in accordance with the Record of Decision. This plan provides supplemental instructions to guidelines and procedures established for sampling and analysis activities. Procedures will be referenced throughout this plan as applicable, and are available for review if necessary

  18. IP Sample Plan #4 | NCI Technology Transfer Center | TTC

    Science.gov (United States)

    Sample letter from Research Institutes and their principal investigator and consultants, describing a data and research tool sharing plan and procedures for sharing data, research materials, and patent and licensing of intellectual property. This letter is designed to be included as part of an application.

  19. Short-Run Contexts and Imperfect Testing for Continuous Sampling Plans

    Directory of Open Access Journals (Sweden)

    Mirella Rodriguez

    2018-04-01

    Full Text Available Continuous sampling plans are used to ensure a high level of quality for items produced in long-run contexts. The basic idea of these plans is to alternate between 100% inspection and a reduced rate of inspection frequency. Any inspected item that is found to be defective is replaced with a non-defective item. Because not all items are inspected, some defective items will escape to the customer. Analytical formulas have been developed that measure both the customer perceived quality and also the level of inspection effort. The analysis of continuous sampling plans does not apply to short-run contexts, where only a finite-size batch of items is to be produced. In this paper, a simulation algorithm is designed and implemented to analyze the customer perceived quality and the level of inspection effort for short-run contexts. A parameter representing the effectiveness of the test used during inspection is introduced to the analysis, and an analytical approximation is discussed. An application of the simulation algorithm that helped answer questions for the U.S. Navy is discussed.

  20. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  1. 105-F and DR Phase 1 Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    Curry, L.R.

    1998-06-01

    This SAP presents the rationale and strategy for characterization of specific rooms within the 105-F and 105-DR reactor buildings. Figures 1-1 and 1-2 identify the rooms that are the subject of this SAP. These rooms are to be decontaminated and demolished as an initial step (Phase 1 ) in the Interim Safe Storage process for these reactors. Section 1.0 presents the background and sites history for the reactor buildings and summarizes the data quality objective process, which provides the logical basis for this SAP. Preliminary surveys indicate that little radiochemical contamination is present. Section 2.0 presents the quality assurance project plan, which includes a project management structure, sampling methods and quality control, and oversight of the sampling process. Section 2.2.1 summarizes the sampling methods, reflecting the radiological and chemical sampling designs presented in Tables 1-17 and 1-18. Section 3.0 presents the Field Sampling Plan for Phase 1. The sampling design is broken into two stages. Stage 1 will verify the list of radioactive constituents of concern and generate the isotopic distribution. The objectives of Stage 2 are to estimate the radionuclide inventories of room debris, quantify chemical contamination, and survey room contents for potential salvage or recycle. Table 3-1 presents the sampling activities to be performed in Stage 1. Tables 1-17 and 1-18 identify samples to be collected in Stage 2. Stage 2 will consist primarily of survey data collection, with fixed laboratory samples to be collected in areas showing visible stains. Quality control sampling requirements are presented in Table 3-2

  2. Tank 241-B-203 push mode core sampling and analysis plan. Revision 1

    International Nuclear Information System (INIS)

    Jo, J.

    1995-01-01

    This Sampling and Analysis Plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for two push-mode core samples from tank 241-B-203 (B-203)

  3. Tank 241-B-204 push mode core sampling and analysis plan. Revision 1

    International Nuclear Information System (INIS)

    Sasaki, L.M.

    1995-01-01

    This Sampling and Analysis Plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for two push-mode core samples from tank 241-B-204 (B-204)

  4. Test plan for K Basin Sludge Canister and Floor Sampling Device

    International Nuclear Information System (INIS)

    Meling, T.A.

    1995-01-01

    This document provides the test plan and procedure forms for conducting the functional and operational acceptance testing of the K Basin Sludge Canister and Floor Sampling Device(s). These samplers samples sludge off the floor of the 100K Basins and out of 100K fuel storage canisters

  5. Efficient sampling algorithms for Monte Carlo based treatment planning

    International Nuclear Information System (INIS)

    DeMarco, J.J.; Solberg, T.D.; Chetty, I.; Smathers, J.B.

    1998-01-01

    Efficient sampling algorithms are necessary for producing a fast Monte Carlo based treatment planning code. This study evaluates several aspects of a photon-based tracking scheme and the effect of optimal sampling algorithms on the efficiency of the code. Four areas were tested: pseudo-random number generation, generalized sampling of a discrete distribution, sampling from the exponential distribution, and delta scattering as applied to photon transport through a heterogeneous simulation geometry. Generalized sampling of a discrete distribution using the cutpoint method can produce speedup gains of one order of magnitude versus conventional sequential sampling. Photon transport modifications based upon the delta scattering method were implemented and compared with a conventional boundary and collision checking algorithm. The delta scattering algorithm is faster by a factor of six versus the conventional algorithm for a boundary size of 5 mm within a heterogeneous geometry. A comparison of portable pseudo-random number algorithms and exponential sampling techniques is also discussed

  6. Tank 241-TX-113 rotary mode core sampling and analysis plan

    International Nuclear Information System (INIS)

    McCain, D.J.

    1998-01-01

    This sampling and analysis plan (SAP) identities characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for push mode core samples from tank 241-TX-113 (TX-113). The Tank Characterization Technical Sampling Basis document identities Retrieval, Pretreatment and Immobilization as an issue that applies to tank TX-113. As a result, a 150 gram composite of solids shall be made and archived for that program. This tank is not on a Watch List

  7. Gas and liquid sampling for closed canisters in KW Basin - Work Plan

    International Nuclear Information System (INIS)

    Pitkoff, C.C.

    1995-01-01

    Work Plan for the design and fabrication of gas/liquid sampler for closed canister sampling in KW Basin. This document defines the tasks associated with the design, fabrication, assembly, and acceptance testing equipment necessary for gas and liquid sampling of the Mark I and Mark II canisters in the K-West basin. The sampling of the gas space and the remaining liquid inside the closed canisters will be used to help understand any changes to the fuel elements and the canisters. Specifically, this work plan will define the scope of work and required task structure, list the technical requirements, describe design configuration control and verification methodologies, detail quality assurance requirements, and present a baseline estimate and schedule

  8. Tank 241-AY-101 Privatization Push Mode Core Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AY-101. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AY-101 required to satisfy ''Data Quality Objectives For RPP Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO)' (Nguyen 1999a), ''Data Quality Objectives For TWRS Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For Low-Activity Waste Feed Butch X (LAW DQO) (Nguyen 1999b)'', ''Low Activity Waste and High-Level Waste Feed Data Quality Objectives (L and H DQO)'' (Patello et al. 1999), and ''Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO)'' (Bloom 1996). Special instructions regarding support to the LAW and HLW DQOs are provided by Baldwin (1999). Push mode core samples will be obtained from risers 15G and 150 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples; composite the liquids and solids; perform chemical analyses on composite and segment samples; archive half-segment samples; and provide sub-samples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AY-101 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plans and are not within the scope of this SAP

  9. Arthroscopic medial meniscus trimming or repair under nerve blocks: Which nerves should be blocked?

    Science.gov (United States)

    Taha, AM; Abd-Elmaksoud, AM

    2016-01-01

    Background: This study aimed to determine the role of the sciatic and obturator nerve blocks (in addition to femoral block) in providing painless arthroscopic medial meniscus trimming/repair. Materials and Methods: One hundred and twenty patients with medial meniscus tear, who had been scheduled to knee arthroscopy, were planned to be included in this controlled prospective double-blind study. The patients were randomly allocated into three equal groups; FSO, FS, and FO. The femoral, sciatic, and obturator nerves were blocked in FSO groups. The femoral and sciatic nerves were blocked in FS group, while the femoral and obturator nerves were blocked in FO group. Intraoperative pain and its causative surgical maneuver were recorded. Results: All the patients (n = 7, 100%) in FO group had intraoperative pain. The research was terminated in this group but completed in FS and FSO groups (40 patients each). During valgus positioning of the knee for surgical management of the medial meniscus tear, the patients in FS group experienced pain more frequently than those in FSO group (P = 0.005). Conclusion: Adding a sciatic nerve block to the femoral nerve block is important for painless knee arthroscopy. Further adding of an obturator nerve block may be needed when a valgus knee position is required to manage the medial meniscus tear. PMID:27375382

  10. UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344

  11. Femoral nerve block in a representative sample of elderly people with hip fracture: A randomised controlled trial.

    Science.gov (United States)

    Unneby, Anna; Svensson, Olle; Gustafson, Yngve; Olofsson, Birgitta

    2017-07-01

    The number of elderly people with hip fracture and dementia is increasing, and many of these patients suffer from pain. Opioids are difficult to adjust and side effects are common, especially with increased age and among patients with dementia. Preoperative femoral nerve block is an alternative pain treatment. To investigate whether preoperative femoral nerve block reduced acute pain and opioid use after hip fracture among elderly patients, including those with dementia. In this randomised controlled trial involving patients aged ≥70years with hip fracture (trochanteric and cervical), including those with dementia, we compared femoral nerve block with conventional pain management, with opioid use if required. The primary outcome was preoperative pain, measured at five timepoints using a visual analogue scale (VAS). Preoperative opioid consumption was also registered. The study sample comprised 266 patients admitted consecutively to the Orthopaedic Ward. The mean age was 84.1 (±6.9)years, 64% of participants were women, 44% lived in residential care facilities, and 120 (45.1%) had dementia diagnoses. Patients receiving femoral nerve block had significantly lower self-rated pain scores from baseline to 12h after admission than did controls. Self-rated and proxy VAS pain scores decreased significantly in these patients from baseline to 12h compared with controls (pblock required less opioids than did controls, overall (2.3±4.0 vs. 5.7±5.2mg, pblock had lower pain scores and required less opioids before surgery compared with those receiving conventional pain management. Femoral nerve block seems to be a feasible pain treatment for elderly people, including those with dementia. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  12. Tank 241-AY-101 Privatization Push Mode Core Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AY-101. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AY-101 required to satisfy Data Quality Objectives For RPP Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO) (Nguyen 1999a), Data Quality Objectives For TWRS Privatization Phase I : Confirm Tank T Is An Appropriate Feed Source For Low-Activity Waste Feed Batch X (LAW DQO) (Nguyen 1999b), Low Activity Waste and High-Level Waste Feed Data Quality Objectives (L and H DQO) (Patello et al. 1999), and Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO) (Bloom 1996). Special instructions regarding support to the LAW and HLW DQOs are provided by Baldwin (1999). Push mode core samples will be obtained from risers 15G and 150 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples; composite the liquids and solids; perform chemical analyses on composite and segment samples; archive half-segment samples; and provide subsamples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AY-101 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plans and are not within the scope of this SAP

  13. Engine Fundamentals: Automotive Mechanics Instructional Program. Block 2.

    Science.gov (United States)

    O'Brien, Ralph D.

    The second of six instructional blocks in automotive mechanics, the lessons and supportive information in the document provide a guide for teachers in planning an instructional program in engine fundamentals at the secondary and postsecondary level. The material, as organized, is a suggested sequence of instruction within each block. Each lesson…

  14. Chain sampling plan (ChSP-1) for desired acceptable quality level (AQL) and limiting quality level (LQL)

    Science.gov (United States)

    Raju, C.; Vidya, R.

    2017-11-01

    Chain Sampling Plan is widely used whenever a small sample attributes plan is required to be used for situations involving destructive products coming out of continuous production process [1, 2]. This paper presents a procedure for the construction and selection of a ChSP-1 by attributes inspection based on membership functions [3]. A procedure using search technique is developed for obtaining the parameters of single sampling plan for a given set of AQL and LQL values. A sample of tables providing ChSP-1 plans for various combinations of AQL and LQL values are presented [4].

  15. Supplement to the UMTRA Project water sampling and analysis plan, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Mexican Hat, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Mexican Hat (DOE, 1994). Further, the supplement serves to confirm our present understanding of the site relative to the hydrogeology and contaminant distribution as well as our intention to continue to use the sampling strategy as presented in the 1994 WSAP document for Mexican Hat. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 (1991) and 60 FR 2854 (1995). Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Mexican Hat site are the Mexican Hat Long-Term Surveillance Plan (currently in progress), and the Mexican Hat Site Observational Work Plan (currently in progress)

  16. A high-pressure thermal gradient block for investigating microbial activity in multiple deep-sea samples

    DEFF Research Database (Denmark)

    Kallmeyer, J.; Ferdelman, TG; Jansen, KH

    2003-01-01

    Details about the construction and use of a high-pressure thermal gradient block for the simultaneous incubation of multiple samples are presented. Most parts used are moderately priced off-the-shelf components that easily obtainable. In order to keep the pressure independent of thermal expansion...... range of temperatures and pressures and can easily be modified to accommodate different experiments, either biological or chemical. As an application, we present measurements of bacterial sulfate reduction rates in hydrothermal sediments from Guyamas Basin over a wide range of temperatures and pressures...

  17. Tune Up: Automotive Mechanics Instructional Program. Block 5.

    Science.gov (United States)

    O'Brien, Ralph D.

    The fifth of six instructional blocks in automotive mechanics, the lessons and supportive information in the document provide a guide for teachers in planning an instructional program in automotive tune-ups at the secondary and post secondary level. The material, as organized, is a suggested sequence of instruction within each block. Each lesson…

  18. Fuel System: Automotive Mechanics Instructional Program. Block 4.

    Science.gov (United States)

    O'Brien, Ralph D.

    The fourth of six instructional blocks in automotive mechanics, the lessons and supportive information in the document provide a guide for teachers in planning an instructional program in automotive fuel systems at the secondary and post secondary level. The material, as organized, is a suggested sequence of instruction within each block. Each…

  19. Cooling System: Automotive Mechanics Instructional Program. Block 6.

    Science.gov (United States)

    O'Brien, Ralph D.

    The last of six instructional blocks in automotive mechanics, the lessons and supportive information in the document provide a guide for teachers in planning an instructional program in the automotive cooling system at the secondary and post secondary level. The material, as organized, is a suggested sequence of instruction within each block. Each…

  20. Baby boom. American anti-abortion politics blocks family planning funding around the world.

    Science.gov (United States)

    Sawicki, S

    1998-01-01

    American anti-abortion politics is blocking family planning (FP) funding around the world. US Representative Chris Smith, a Republican of New Jersey, attempted to amend a proposal that would require health-care providers of federal workers who cover prescription drugs to also pay for prescribed contraceptives. Smith's amendment would have exempted any contraceptive that inhibits implantation. This action was defeated but clearly revealed that this anti-abortion politician's agenda is also anti-FP. The right-wing has hampered Clinton administration efforts to support reproductive rights. There is a link between FP and the survival of the planet from an environmentalist point of view that recognizes the extreme danger of the resource depletion attendant upon overpopulation. The Vatican's opposition to reproductive rights has resulted in serious restrictions on the delivery of reproductive health care in cases where public hospitals have merged with Roman Catholic health corporations. The population problem is "fixable" but efforts to do so remain deadlocked by a vocal minority of conservatives.

  1. The Toggle Local Planner for sampling-based motion planning

    KAUST Repository

    Denny, Jory

    2012-05-01

    Sampling-based solutions to the motion planning problem, such as the probabilistic roadmap method (PRM), have become commonplace in robotics applications. These solutions are the norm as the dimensionality of the planning space grows, i.e., d > 5. An important primitive of these methods is the local planner, which is used for validation of simple paths between two configurations. The most common is the straight-line local planner which interpolates along the straight line between the two configurations. In this paper, we introduce a new local planner, Toggle Local Planner (Toggle LP), which extends local planning to a two-dimensional subspace of the overall planning space. If no path exists between the two configurations in the subspace, then Toggle LP is guaranteed to correctly return false. Intuitively, more connections could be found by Toggle LP than by the straight-line planner, resulting in better connected roadmaps. As shown in our results, this is the case, and additionally, the extra cost, in terms of time or storage, for Toggle LP is minimal. Additionally, our experimental analysis of the planner shows the benefit for a wide array of robots, with DOF as high as 70. © 2012 IEEE.

  2. Gas liquid sampling for closed canisters in KW Basin - test plan

    International Nuclear Information System (INIS)

    Pitkoff, C.C.

    1995-01-01

    Test procedures for the gas/liquid sampler. Characterization of the Spent Nuclear Fuel, SNF, sealed in canisters at KW-Basin is needed to determine the state of storing SNF wet. Samples of the liquid and the gas in the closed canisters will be taken to gain characterization information. Sampling equipment has been designed to retrieve gas and liquid from the closed canisters in KW basin. This plan is written to outline the test requirements for this developmental sampling equipment

  3. Failure-censored accelerated life test sampling plans for Weibull distribution under expected test time constraint

    International Nuclear Information System (INIS)

    Bai, D.S.; Chun, Y.R.; Kim, J.G.

    1995-01-01

    This paper considers the design of life-test sampling plans based on failure-censored accelerated life tests. The lifetime distribution of products is assumed to be Weibull with a scale parameter that is a log linear function of a (possibly transformed) stress. Two levels of stress higher than the use condition stress, high and low, are used. Sampling plans with equal expected test times at high and low test stresses which satisfy the producer's and consumer's risk requirements and minimize the asymptotic variance of the test statistic used to decide lot acceptability are obtained. The properties of the proposed life-test sampling plans are investigated

  4. Transuranic waste characterization sampling and analysis plan

    International Nuclear Information System (INIS)

    1994-01-01

    Los Alamos National Laboratory (the Laboratory) is located approximately 25 miles northwest of Santa Fe, New Mexico, situated on the Pajarito Plateau. Technical Area 54 (TA-54), one of the Laboratory's many technical areas, is a radioactive and hazardous waste management and disposal area located within the Laboratory's boundaries. The purpose of this transuranic waste characterization, sampling, and analysis plan (CSAP) is to provide a methodology for identifying, characterizing, and sampling approximately 25,000 containers of transuranic waste stored at Pads 1, 2, and 4, Dome 48, and the Fiberglass Reinforced Plywood Box Dome at TA-54, Area G, of the Laboratory. Transuranic waste currently stored at Area G was generated primarily from research and development activities, processing and recovery operations, and decontamination and decommissioning projects. This document was created to facilitate compliance with several regulatory requirements and program drivers that are relevant to waste management at the Laboratory, including concerns of the New Mexico Environment Department

  5. UMTRA project water sampling and analysis plan, Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1994-06-01

    Surface remedial action was completed at the Salt Lake City, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project site in the fall of 1987. Results of water sampling for the years 1992 to 1994 indicate that site-related ground water contamination occurs in the shallow unconfined aquifer (the uppermost aquifer). With respect to background ground water quality, contaminated ground water in the shallow, unconfined aquifer has elevated levels of chloride, sodium, sulfate, total dissolved solids, and uranium. No contamination associated with the former tailings pile occurs in levels exceeding background in ground water in the deeper confined aquifer. This document provides the water sampling and analysis plan for ground water monitoring at the former uranium processing site in Salt Lake City, Utah (otherwise known as the ''Vitro'' site, named after the Vitro Chemical Company that operated the mill). All contaminated materials removed from the processing site were relocated and stabilized in a disposal cell near Clive, Utah, some 85 miles west of the Vitro site (known as the ''Clive'' disposal site). No ground water monitoring is being performed at the Clive disposal site, since concurrence of the remedial action plan by the US Nuclear Regulatory Commission and completion of the disposal cell occurred before the US Environmental Protection Agency issued draft ground water standards in 1987 (52 FR 36000) for cleanup, stabilization, and control of residual radioactive materials at the disposal site. In addition, the likelihood of post-closure impact on the ground water is minimal to nonexistent, due to the naturally poor quality of the ground water. Water sampling activities planned for calendar year 1994 consist of sampling ground water from nine monitor wells to assess the migration of contamination within the shallow unconfined aquifer and sampling ground water from two existing monitor wells to assess ground water quality in the confined aquifer

  6. Comparison of the Cellient(™) automated cell block system and agar cell block method.

    Science.gov (United States)

    Kruger, A M; Stevens, M W; Kerley, K J; Carter, C D

    2014-12-01

    To compare the Cellient(TM) automated cell block system with the agar cell block method in terms of quantity and quality of diagnostic material and morphological, histochemical and immunocytochemical features. Cell blocks were prepared from 100 effusion samples using the agar method and Cellient system, and routinely sectioned and stained for haematoxylin and eosin and periodic acid-Schiff with diastase (PASD). A preliminary immunocytochemical study was performed on selected cases (27/100 cases). Sections were evaluated using a three-point grading system to compare a set of morphological parameters. Statistical analysis was performed using Fisher's exact test. Parameters assessing cellularity, presence of single cells and definition of nuclear membrane, nucleoli, chromatin and cytoplasm showed a statistically significant improvement on Cellient cell blocks compared with agar cell blocks (P cell groups, PASD staining or the intensity or clarity of immunocytochemical staining. A discrepant immunocytochemistry (ICC) result was seen in 21% (13/63) of immunostains. The Cellient technique is comparable with the agar method, with statistically significant results achieved for important morphological features. It demonstrates potential as an alternative cell block preparation method which is relevant for the rapid processing of fine needle aspiration samples, malignant effusions and low-cellularity specimens, where optimal cell morphology and architecture are essential. Further investigation is required to optimize immunocytochemical staining using the Cellient method. © 2014 John Wiley & Sons Ltd.

  7. Statistical sampling plan for the TRU waste assay facility

    International Nuclear Information System (INIS)

    Beauchamp, J.J.; Wright, T.; Schultz, F.J.; Haff, K.; Monroe, R.J.

    1983-08-01

    Due to limited space, there is a need to dispose appropriately of the Oak Ridge National Laboratory transuranic waste which is presently stored below ground in 55-gal (208-l) drums within weather-resistant structures. Waste containing less than 100 nCi/g transuranics can be removed from the present storage and be buried, while waste containing greater than 100 nCi/g transuranics must continue to be retrievably stored. To make the necessary measurements needed to determine the drums that can be buried, a transuranic Neutron Interrogation Assay System (NIAS) has been developed at Los Alamos National Laboratory and can make the needed measurements much faster than previous techniques which involved γ-ray spectroscopy. The previous techniques are reliable but time consuming. Therefore, a validation study has been planned to determine the ability of the NIAS to make adequate measurements. The validation of the NIAS will be based on a paired comparison of a sample of measurements made by the previous techniques and the NIAS. The purpose of this report is to describe the proposed sampling plan and the statistical analyses needed to validate the NIAS. 5 references, 4 figures, 5 tables

  8. Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    RASMUSSEN, J.H.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AZ-102 required to satisfy the Data Quality Objectives For TWRS Privatization Phase I : Confirm Tank TIS An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO) (Nguyen 1999a), Data Quality Objectives For TWRS Privatization Phase 1: Confirm Tank TIS An Appropriate Feed Source For Low-Activity Waste Feed Batch X (LAW DQO) (Nguyen 1999b), Low Activity Waste and High Level Waste Feed Data Quality Objectives (L and H DQO) (Patello et al. 1999) and Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO) (Bloom 1996). The Tank Characterization Technical Sampling Basis document (Brown et al. 1998) indicates that these issues, except the Equipment DQO apply to tank 241-AZ-102 for this sampling event. The Equipment DQO is applied for shear strength measurements of the solids segments only. Poppiti (1999) requires additional americium-241 analyses of the sludge segments. Brown et al. (1998) also identify safety screening, regulatory issues and provision of samples to the Privatization Contractor(s) as applicable issues for this tank. However, these issues will not be addressed via this sampling event. Reynolds et al. (1999) concluded that information from previous sampling events was sufficient to satisfy the safety screening requirements for tank 241-AZ-102. Push mode core samples will be obtained from risers 15C and 24A to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples, composite the liquids and solids, perform chemical analyses

  9. Field Investigation Plan for 1301-N and 1325-N Facilities Sampling to Support Remedial Design

    International Nuclear Information System (INIS)

    Weiss, S. G.

    1998-01-01

    This field investigation plan (FIP) provides for the sampling and analysis activities supporting the remedial design planning for the planned removal action for the 1301-N and 1325-N Liquid Waste Disposal Facilities (LWDFs), which are treatment, storage,and disposal (TSD) units (cribs/trenches). The planned removal action involves excavation, transportation, and disposal of contaminated material at the Environmental Restoration Disposal Facility (ERDF).An engineering study (BHI 1997) was performed to develop and evaluate various options that are predominantly influenced by the volume of high- and low-activity contaminated soil requiring removal. The study recommended that additional sampling be performed to supplement historical data for use in the remedial design

  10. Compatibility Grab Sampling and Analysis Plan for FY 2000

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for grab samples obtained to address waste compatibility. It is written in accordance with requirements identified in Data Quality Objectives for Tank Farms Waste Compatibility Program (Mulkey et al. 1999) and Tank Farm Waste Transfer Compatibility Program (Fowler 1999). In addition to analyses to support Compatibility, the Waste Feed Delivery program has requested that tank samples obtained for Compatibility also be analyzed to confirm the high-level waste and/or low-activity waste envelope(s) for the tank waste (Baldwin 1999). The analytical requirements to confirm waste envelopes are identified in Data Quality Objectives for TWRS Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for Low-Activity Waste Feed Batch X (Nguyen 1999a) and Data Quality Objectives for RPP Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for High-Level Waste Feed Batch X (Nguyen 1999b)

  11. Planning Related to the Curation and Processing of Returned Martian Samples

    Science.gov (United States)

    McCubbin, F. M.; Harrington, A. D.

    2018-04-01

    Many of the planning activities in the NASA Astromaterials Acquisition and Curation Office at JSC are centered around Mars Sample Return. The importance of contamination knowledge and the benefits of a mobile/modular receiving facility are discussed.

  12. SNUPPS power block engineering

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, C A [Bechtel Power Corp., San Francisco, Calif. (USA)

    1975-11-01

    The Standard Power Block is based on a modular concept and consists of the following: turbine building, auxiliary building, fuel building, control building, radwaste building, diesel generators building, and outside storage tanks and transformers. Each power block unit includes a Westinghouse pressurized water reactor and has a thermal power rating of 3425 MW(t). The corresponding General Electric turbine generator net electrical output is 1188 MW(e). This standardization approach results in not only a reduction in the costs of engineering, licensing, procurement, and project planning, but should also result in additional savings by the application of experience gained in the construction of the first unit to the following units and early input of construction data to design.

  13. Supplement to the UMTRA Project water sampling and analysis plan, Maybell, Colorado

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Maybell, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Maybell (DOE, 1994a). Further, this supplement serves to confirm our present understanding of the site relative to the hydrogeology and contaminant distribution as well as our intention to continue to use the sampling strategy as presented in the 1994 WSAP document for Maybell. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 (1994) and 60 CFR 2854 (1 995). Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Maybell site are the Maybell Baseline Risk Assessment (currently in progress), the Maybell Remedial Action Plan (RAP) (DOE, 1994b), and the Maybell Environmental Assessment (DOE, 1995)

  14. Engineering Task Plan to Expand the Environmental Operational Envelope of Core Sampling

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan authorizes the development of an Alternative Generation and Analysis (AGA). The AGA will determine how to expand the environmental operating envelope during core sampling operations

  15. An efficient, block-by-block algorithm for inverting a block tridiagonal, nearly block Toeplitz matrix

    International Nuclear Information System (INIS)

    Reuter, Matthew G; Hill, Judith C

    2012-01-01

    We present an algorithm for computing any block of the inverse of a block tridiagonal, nearly block Toeplitz matrix (defined as a block tridiagonal matrix with a small number of deviations from the purely block Toeplitz structure). By exploiting both the block tridiagonal and the nearly block Toeplitz structures, this method scales independently of the total number of blocks in the matrix and linearly with the number of deviations. Numerical studies demonstrate this scaling and the advantages of our method over alternatives.

  16. Chemical Hygiene Plan for Onsite Measurement and Sample Shipping Facility Activities

    International Nuclear Information System (INIS)

    Price, W.H.

    1998-01-01

    This chemical hygiene plan presents the requirements established to ensure the protection of employee health while performing work in mobile laboratories, the sample shipping facility, and at the onsite radiological counting facility. This document presents the measures to be taken to promote safe work practices and to minimize worker exposure to hazardous chemicals. Specific hazardous chemicals present in the mobile laboratories, the sample shipping facility, and in the radiological counting facility are presented in Appendices A through G

  17. UMTRA project water sampling and analysis plan -- Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-02-01

    Water sampling and analysis plan (WSAP) is required for each U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide a basis for ground water and surface water sampling at disposal and former processing sites. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring stations at the Navaho Reservation in Shiprock, New Mexico, UMTRA Project site. The purposes of the water sampling at Shiprock for fiscal year (FY) 1994 are to (1) collect water quality data at new monitoring locations in order to build a defensible statistical data base, (2) monitor plume movement on the terrace and floodplain, and (3) monitor the impact of alluvial ground water discharge into the San Juan River. The third activity is important because the community of Shiprock withdraws water from the San Juan River directly across from the contaminated alluvial floodplain below the abandoned uranium mill tailings processing site

  18. Supplement to the UMTRA Project water sampling and analysis plan, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Riverton (DOE, 1994). Further, the supplement serves to confirm the Project's present understanding of the site relative to the hydrogeology and contaminant distribution as well as the intent to continue to use the sampling strategy as presented in the 1994 WSAP document for Riverton. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 and 60 FR 2854. Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Riverton site are the Riverton Baseline Risk Assessment (BLRA) (DOE, 1995a) and the Riverton Site Observational Work Plan (SOWP) (DOE, 1995b)

  19. C-018H Pre-Operational Baseline Sampling Plan

    International Nuclear Information System (INIS)

    Guzek, S.J.

    1993-01-01

    The objective of this task is to field characterize and sample the soil at selected locations along the proposed effluent line routes for Project C-018H. The overall purpose of this effort is to meet the proposed plan to discontinue the disposal of contaminated liquids into the Hanford soil column as described by DOE (1987). Detailed information describing proposed transport pipeline route and associated Kaiser Engineers Hanford Company (KEH) preliminary drawings (H288746...755) all inclusive, have been prepared by KEH (1992). The information developed from field monitoring and sampling will be utilized to characterize surface and subsurface soil along the proposed C-018H effluent pipeline and it's associated facilities. Potentially existing contaminant levels may be encountered therefore, soil characterization will provide a construction preoperational baseline reference, develop personnel safety requirements, and determine the need for any changes in the proposed routes prior to construction of the pipeline

  20. Food safety assurance systems: Microbiological testing, sampling plans, and microbiological criteria

    NARCIS (Netherlands)

    Zwietering, M.H.; Ross, T.; Gorris, L.G.M.

    2014-01-01

    Microbiological criteria give information about the quality or safety of foods. A key component of a microbiological criterion is the sampling plan. Considering: (1) the generally low level of pathogens that are deemed tolerable in foods, (2) large batch sizes, and (3) potentially substantial

  1. 10 CFR Appendix A to Subpart U of... - Sampling Plan for Enforcement Testing of Electric Motors

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sampling Plan for Enforcement Testing of Electric Motors A Appendix A to Subpart U of Part 431 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY... to Subpart U of Part 431—Sampling Plan for Enforcement Testing of Electric Motors Step 1. The first...

  2. Double-Shell Tank (DST) Ventilation System Vapor Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples from the primary ventilation systems of the AN, AP, AW, and AY/AZ tank farms. Sampling will be performed in accordance with Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissions Sampling and Analysis (Air DQO) (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications. Vapor samples will be obtained from tank farm ventilation systems, downstream from the tanks and upstream of any filtration. Samples taken in support of the DQO will consist of SUMMA(trademark) canisters, triple sorbent traps (TSTs), sorbent tube trains (STTs), polyurethane foam (PUF) samples. Particulate filter samples and tritium traps will be taken for radiation screening to allow the release of the samples for analysis. The following sections provide the general methodology and procedures to be used in the preparation, retrieval, transport, analysis, and reporting of results from the vapor samples

  3. Compaction of bentonite blocks. Development of technique for industrial production of blocks which are manageable by man

    Energy Technology Data Exchange (ETDEWEB)

    Johannesson, L E; Boergesson, L; Sanden, T [Clay Technology AB, Lund (Sweden)

    1995-04-01

    In this report a useful technique for producing compacted blocks of bentonite is described. The report only deals with the technique to produce uniaxially compacted blocks (weight of the blocks: 10-15 kg) which are manageable by man. Tests for producing blocks with a weight of approximately 10 kg were carried out at Hoeganaes Bjuf AB in Bjuf. This industry is normally producing refractory bricks and other refractory products. The plant has facilities for handling large volumes of clay. Furthermore there are machines suitable for producing uniaxially compacted blocks. Performed tests at the plant show that it is possible to compact blocks with good quality. Best quality was reached with a coarsely ground bentonite at a water ratio of 20 %. The compaction was performed with lubricated form and stepwise loading. The tests at Hoeganaes Bjuf AB were preceded by tests in the laboratory. In these tests smaller samples were compacted for studying how different factors affect the quality of the samples (density, water ratio, homogeneity et cetera). The influence of following factors was studied: water ratio of bentonite; bentonite type and granulometry; compaction pressure; compaction rate; form geometry; form lubrication; form heating. The results from these tests were used to modify and optimize the technique in the factory.

  4. [THE TECHNOLOGY "CELL BLOCK" IN CYTOLOGICAL PRACTICE].

    Science.gov (United States)

    Volchenko, N N; Borisova, O V; Baranova, I B

    2015-08-01

    The article presents summary information concerning application of "cell block" technology in cytological practice. The possibilities of implementation of various modern techniques (immune cytochemnical analysis. FISH, CISH, polymerase chain reaction) with application of "cell block" method are demonstrated. The original results of study of "cell block" technology made with gelatin, AgarCyto and Shadon Cyoblock set are presented. The diagnostic effectiveness of "cell block" technology and common cytological smear and also immune cytochemical analysis on samples of "cell block" technology and fluid cytology were compared. Actually application of "cell block" technology is necessary for ensuring preservation of cell elements for subsequent immune cytochemical and molecular genetic analysis.

  5. Neuromuscular dose-response studies: determining sample size.

    Science.gov (United States)

    Kopman, A F; Lien, C A; Naguib, M

    2011-02-01

    Investigators planning dose-response studies of neuromuscular blockers have rarely used a priori power analysis to determine the minimal sample size their protocols require. Institutional Review Boards and peer-reviewed journals now generally ask for this information. This study outlines a proposed method for meeting these requirements. The slopes of the dose-response relationships of eight neuromuscular blocking agents were determined using regression analysis. These values were substituted for γ in the Hill equation. When this is done, the coefficient of variation (COV) around the mean value of the ED₅₀ for each drug is easily calculated. Using these values, we performed an a priori one-sample two-tailed t-test of the means to determine the required sample size when the allowable error in the ED₅₀ was varied from ±10-20%. The COV averaged 22% (range 15-27%). We used a COV value of 25% in determining the sample size. If the allowable error in finding the mean ED₅₀ is ±15%, a sample size of 24 is needed to achieve a power of 80%. Increasing 'accuracy' beyond this point requires increasing greater sample sizes (e.g. an 'n' of 37 for a ±12% error). On the basis of the results of this retrospective analysis, a total sample size of not less than 24 subjects should be adequate for determining a neuromuscular blocking drug's clinical potency with a reasonable degree of assurance.

  6. Optimal sampling plan for clean development mechanism energy efficiency lighting projects

    International Nuclear Information System (INIS)

    Ye, Xianming; Xia, Xiaohua; Zhang, Jiangfeng

    2013-01-01

    Highlights: • A metering cost minimisation model is built to assist the sampling plan for CDM projects. • The model minimises the total metering cost by the determination of optimal sample size. • The required 90/10 criterion sampling accuracy is maintained. • The proposed metering cost minimisation model is applicable to other CDM projects as well. - Abstract: Clean development mechanism (CDM) project developers are always interested in achieving required measurement accuracies with the least metering cost. In this paper, a metering cost minimisation model is proposed for the sampling plan of a specific CDM energy efficiency lighting project. The problem arises from the particular CDM sampling requirement of 90% confidence and 10% precision for the small-scale CDM energy efficiency projects, which is known as the 90/10 criterion. The 90/10 criterion can be met through solving the metering cost minimisation problem. All the lights in the project are classified into different groups according to uncertainties of the lighting energy consumption, which are characterised by their statistical coefficient of variance (CV). Samples from each group are randomly selected to install power meters. These meters include less expensive ones with less functionality and more expensive ones with greater functionality. The metering cost minimisation model will minimise the total metering cost through the determination of the optimal sample size at each group. The 90/10 criterion is formulated as constraints to the metering cost objective. The optimal solution to the minimisation problem will therefore minimise the metering cost whilst meeting the 90/10 criterion, and this is verified by a case study. Relationships between the optimal metering cost and the population sizes of the groups, CV values and the meter equipment cost are further explored in three simulations. The metering cost minimisation model proposed for lighting systems is applicable to other CDM projects as

  7. Health plan auditing: 100-percent-of-claims vs. random-sample audits.

    Science.gov (United States)

    Sillup, George P; Klimberg, Ronald K

    2011-01-01

    The objective of this study was to examine the relative efficacy of two different methodologies for auditing self-funded medical claim expenses: 100-percent-of-claims auditing versus random-sampling auditing. Multiple data sets of claim errors or 'exceptions' from two Fortune-100 corporations were analysed and compared to 100 simulated audits of 300- and 400-claim random samples. Random-sample simulations failed to identify a significant number and amount of the errors that ranged from $200,000 to $750,000. These results suggest that health plan expenses of corporations could be significantly reduced if they audited 100% of claims and embraced a zero-defect approach.

  8. Compatibility grab sampling and analysis plan for fiscal year 1999

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for grab samples obtained to address waste compatibility. Analytical requirements are taken from two revisions of the Compatibility data quality objectives (DQOs). Revision 1 of the DQO (Fowler 1995) listed analyses to be performed to meet both safety and operational data needs for the Compatibility program. Revision 2A of the DQO (Mulkey and Miller 1998) addresses only the safety-related requirements; the operational requirements of Fowler (1995) have not been superseded by Mulkey and Miller (1998). Therefore, safety-related data needs are taken from Mulkey and Miller (1998) and operational-related data needs are taken from Fowler (1995). Ammonia and total alpha analyses are also performed in accordance with Fowler (1998a, 1998b)

  9. Synthesis and gas permeability of block copolymers composed of poly(styrene-co-acrylonitrile) and polystyrene blocks

    Czech Academy of Sciences Publication Activity Database

    Lokaj, Jan; Brožová, Libuše; Holler, Petr; Pientka, Zbyněk

    2002-01-01

    Roč. 67, č. 2 (2002), s. 267-278 ISSN 0010-0765 R&D Projects: GA ČR GA203/99/0572 Institutional research plan: CEZ:AV0Z4050913 Keywords : azeotropic styrene-acrylonitrile copolymers * block copolymers * nitroxide-mediated copolymerization Subject RIV: CD - Macromolecular Chemistry Impact factor: 0.848, year: 2002

  10. Development and Demonstration of a Method to Evaluate Bio-Sampling Strategies Using Building Simulation and Sample Planning Software.

    Science.gov (United States)

    Dols, W Stuart; Persily, Andrew K; Morrow, Jayne B; Matzke, Brett D; Sego, Landon H; Nuffer, Lisa L; Pulsipher, Brent A

    2010-01-01

    In an effort to validate and demonstrate response and recovery sampling approaches and technologies, the U.S. Department of Homeland Security (DHS), along with several other agencies, have simulated a biothreat agent release within a facility at Idaho National Laboratory (INL) on two separate occasions in the fall of 2007 and the fall of 2008. Because these events constitute only two realizations of many possible scenarios, increased understanding of sampling strategies can be obtained by virtually examining a wide variety of release and dispersion scenarios using computer simulations. This research effort demonstrates the use of two software tools, CONTAM, developed by the National Institute of Standards and Technology (NIST), and Visual Sample Plan (VSP), developed by Pacific Northwest National Laboratory (PNNL). The CONTAM modeling software was used to virtually contaminate a model of the INL test building under various release and dissemination scenarios as well as a range of building design and operation parameters. The results of these CONTAM simulations were then used to investigate the relevance and performance of various sampling strategies using VSP. One of the fundamental outcomes of this project was the demonstration of how CONTAM and VSP can be used together to effectively develop sampling plans to support the various stages of response to an airborne chemical, biological, radiological, or nuclear event. Following such an event (or prior to an event), incident details and the conceptual site model could be used to create an ensemble of CONTAM simulations which model contaminant dispersion within a building. These predictions could then be used to identify priority area zones within the building and then sampling designs and strategies could be developed based on those zones.

  11. Radiotherapy facilities: Master planning and concept design considerations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-08-15

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology, a typical project work plan and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals.

  12. Radiotherapy facilities: Master planning and concept design considerations

    International Nuclear Information System (INIS)

    2014-01-01

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology, a typical project work plan and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals

  13. 40 CFR Appendix Xi to Part 86 - Sampling Plans for Selective Enforcement Auditing of Light-Duty Vehicles

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Sampling Plans for Selective Enforcement Auditing of Light-Duty Vehicles XI Appendix XI to Part 86 Protection of Environment ENVIRONMENTAL... Enforcement Auditing of Light-Duty Vehicles 40% AQL Table 1—Sampling Plan Code Letter Annual sales of...

  14. Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casella, Amanda J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pereira, Mario M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Steen, Franciska H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-01-01

    This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

  15. Block level energy planning for domestic lighting - a multi-objective fuzzy linear programming approach

    Energy Technology Data Exchange (ETDEWEB)

    Jana, C. [Indian Inst. of Social Welfare and Business Management, Kolkata (India); Chattopadhyay, R.N. [Indian Inst. of Technology, Kharagpur (India). Rural Development Centre

    2004-09-01

    Creating provisions for domestic lighting is important for rural development. Its significance in rural economy is unquestionable since some activities, like literacy, education and manufacture of craft items and other cottage products are largely dependent on domestic lighting facilities for their progress and prosperity. Thus, in rural energy planning, domestic lighting remains a key sector for allocation of investments. For rational allocation, decision makers need alternative strategies for identifying adequate and proper investment structure corresponding to appropriate sources and precise devices. The present study aims at designing a model of energy utilisation by developing a decision support frame for an optimised solution to the problem, taking into consideration four sources and six devices suitable for the study area, namely Narayangarh Block of Midnapore District in India. Since the data available from rural and unorganised sectors are often ill-defined and subjective in nature, many coefficients are fuzzy numbers, and hence several constraints appear to be fuzzy expressions. In this study, the energy allocation model is initiated with three separate objectives for optimisation, namely minimising the total cost, minimising the use of non-local sources of energy and maximising the overall efficiency of the system. Since each of the above objective-based solutions has relevance to the needs of the society and economy, it is necessary to build a model that makes a compromise among the three individual solutions. This multi-objective fuzzy linear programming (MOFLP) model, solved in a compromising decision support frame, seems to be a more rational alternative than single objective linear programming model in rural energy planning. (author)

  16. Tank 241-SY-101 push mode core sampling and analysis plan

    International Nuclear Information System (INIS)

    CONNER, J.M.

    1998-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for push mode core samples from tank 241-SY-101 (SY-101). It is written in accordance with Data Quality Objective to Support Resolution of the Flammable Gas Safety Issue (Bauer 1998), Low Activity Waste Feed Data Quality Objectives (Wiemers and Miller 1997 and DOE 1998), Data Quality Objectives for TWRS Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for Low-Activity Waste Feed Batch X (Certa 1998), and the Tank Safety Screening Data Quality Objective (Dukelow et al. 1995). The Tank Characterization Technical Sampling Basis document (Brown et al. 1998) indicates that these issues apply to tank SY-101 for this sampling event. Brown et al. also identifies high-level waste, regulatory, pretreatment and disposal issues as applicable issues for this tank. However, these issues will not be addressed via this sampling event

  17. Role of green spaces in spatial and functional conception of block 23 in Bela Crkva

    Directory of Open Access Journals (Sweden)

    Manić Božidar

    2011-01-01

    Full Text Available In this paper we examine the possibilities of improving urban settlement structure by interpolation of passive protection concepts against global climate changes, as a measure of bioclimatic design and town planning. As a kind of passive protection concept described in this paper, the way of applying green areas in urban fabric planning is pointed out. The research applies the method of analyses of subject matter - existing legislation, planning documents, professional literature, the available foreign practice, as well as scanning in situ. The case study shows the concept of planning solution to the block 23 in Bela Crkva, with special emphasis on the role of green areas. It points to the specific position of the block in the urban fabric, where the planned use - housing - is located in proximity to the existing use - industry. Then we analyze the possibility to affirm the existing, spontaneously developed agriculture activity in the block, through some planning guidelines, based on the presented comparative examples of urban agriculture in foreign countries.

  18. Soil sampling and analysis plan for the 3718-F Alkali Metal Treatment and Storage Facility closure activities

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-05-01

    Amendment V.13.B.b to the approved closure plan (DOE-RL 1995a) requires that a soil sampling and analysis plan be prepared and submitted to the Washington State Department of Ecology (Ecology) for review and approval. Amendment V.13.B.c requires that a diagram of the 3718-F Alkali Metal Treatment and Storage Facility unit (the treatment, storage, and disposal [TSD] unit) boundary that is to be closed, including the maximum extent of operation, be prepared and submitted as part is of the soil sampling and analysis plan. This document describes the sampling and analysis that is to be performed in response to these requirements and amends the closure plan. Specifically, this document supersedes Section 6.2, lines 43--46, and Section 7.3.6 of the closure plan. Results from the analysis will be compared to cleanup levels identified in the closure plan. These cleanup levels will be established using residential exposure assumptions in accordance with the Model Toxics Control Act (MTCA) Cleanup Regulation (Washington Administrative Code [WAC] 173-340) as required in Amendment V.13.B.I. Results of all sampling, including the raw analytical data, a summary of analytical results, a data validation package, and a narrative summary with conclusions will be provided to Ecology as specified in Amendment V.13.B.e. The results and process used to collect and analyze the soil samples will be certified by a licensed professional engineer. These results and a certificate of closure for the balance of the TSD unit, as outlined in Chapter 7.0 of the approved closure plan (storage shed, concrete pad, burn building, scrubber, and reaction tanks), will provide the basis for a closure determination.

  19. Soil sampling and analysis plan for the 3718-F Alkali Metal Treatment and Storage Facility closure activities

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1997-01-01

    Amendment V.13.B.b to the approved closure plan (DOE-RL 1995a) requires that a soil sampling and analysis plan be prepared and submitted to the Washington State Department of Ecology (Ecology) for review and approval. Amendment V.13.B.c requires that a diagram of the 3718-F Alkali Metal Treatment and Storage Facility unit (the treatment, storage, and disposal [TSD] unit) boundary that is to be closed, including the maximum extent of operation, be prepared and submitted as part is of the soil sampling and analysis plan. This document describes the sampling and analysis that is to be performed in response to these requirements and amends the closure plan. Specifically, this document supersedes Section 6.2, lines 43--46, and Section 7.3.6 of the closure plan. Results from the analysis will be compared to cleanup levels identified in the closure plan. These cleanup levels will be established using residential exposure assumptions in accordance with the Model Toxics Control Act (MTCA) Cleanup Regulation (Washington Administrative Code [WAC] 173-340) as required in Amendment V.13.B.I. Results of all sampling, including the raw analytical data, a summary of analytical results, a data validation package, and a narrative summary with conclusions will be provided to Ecology as specified in Amendment V.13.B.e. The results and process used to collect and analyze the soil samples will be certified by a licensed professional engineer. These results and a certificate of closure for the balance of the TSD unit, as outlined in Chapter 7.0 of the approved closure plan (storage shed, concrete pad, burn building, scrubber, and reaction tanks), will provide the basis for a closure determination

  20. Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    2000-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification. Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissions Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications

  1. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  2. Fixed-Precision Sequential Sampling Plans for Estimating Alfalfa Caterpillar, Colias lesbia, Egg Density in Alfalfa, Medicago sativa, Fields in Córdoba, Argentina

    Science.gov (United States)

    Serra, Gerardo V.; Porta, Norma C. La; Avalos, Susana; Mazzuferi, Vilma

    2013-01-01

    The alfalfa caterpillar, Colias lesbia (Fabricius) (Lepidoptera: Pieridae), is a major pest of alfalfa, Medicago sativa L. (Fabales: Fabaceae), crops in Argentina. Its management is based mainly on chemical control of larvae whenever the larvae exceed the action threshold. To develop and validate fixed-precision sequential sampling plans, an intensive sampling programme for C. lesbia eggs was carried out in two alfalfa plots located in the Province of Córdoba, Argentina, from 1999 to 2002. Using Resampling for Validation of Sampling Plans software, 12 additional independent data sets were used to validate the sequential sampling plan with precision levels of 0.10 and 0.25 (SE/mean), respectively. For a range of mean densities of 0.10 to 8.35 eggs/sample, an average sample size of only 27 and 26 sample units was required to achieve a desired precision level of 0.25 for the sampling plans of Green and Kuno, respectively. As the precision level was increased to 0.10, average sample size increased to 161 and 157 sample units for the sampling plans of Green and Kuno, respectively. We recommend using Green's sequential sampling plan because it is less sensitive to changes in egg density. These sampling plans are a valuable tool for researchers to study population dynamics and to evaluate integrated pest management strategies. PMID:23909840

  3. Savannah River Site sample and analysis plan for Clemson Technical Center waste

    International Nuclear Information System (INIS)

    Hagstrom, T.

    1998-04-01

    The purpose of this sampling and analysis plan is to determine the chemical, physical and radiological properties of the SRS radioactive Polychlorinated Biphenyl (PCB) liquid waste stream, to verify that it conforms to Waste Acceptance Criteria of the Department of Energy (DOE) East Tennessee Technology Park (ETTP) Toxic Substance Control Act (TSCA) Incineration Facility. Waste being sent to the ETTP TSCA Incinerator for treatment must be sufficiently characterized to ensure that the waste stream meets the waste acceptance criteria to ensure proper handling, classification, and processing of incoming waste to meet the Waste Storage and Treatment Facility's Operating Permits. This sampling and analysis plan is limited to WSRC container(s) of homogeneous or multiphasic radioactive PCB contaminated liquids generated in association with a treatability study at Clemson Technical Center (CTC) and currently stored at the WSRC Solid Waste Division Mixed Waste Storage Facility (MWSF)

  4. 241-Z-361 Sludge Characterization Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    BANNING, D.L.

    1999-08-05

    This sampling and analysis plan (SAP) identifies the type, quantity, and quality of data needed to support characterization of the sludge that remains in Tank 241-2-361. The procedures described in this SAP are based on the results of the 241-2-361 Sludge Characterization Data Quality Objectives (DQO) (BWHC 1999) process for the tank. The primary objectives of this project are to evaluate the contents of Tank 241-2-361 in order to resolve safety and safeguards issues and to assess alternatives for sludge removal and disposal.

  5. 241-Z-361 Sludge Characterization Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    BANNING, D.L.

    1999-07-29

    This sampling and analysis plan (SAP) identifies the type, quantity, and quality of data needed to support characterization of the sludge that remains in Tank 241-2-361. The procedures described in this SAP are based on the results of the 241-2-361 Sludge Characterization Data Quality Objectives (DQO) (BWHC 1999) process for the tank. The primary objectives of this project are to evaluate the contents of Tank 241-2-361 in order to resolve safety and safeguards issues and to assess alternatives for sludge removal and disposal.

  6. Equity Block Transfers in Transition Economies : Evidence from Poland

    NARCIS (Netherlands)

    Trojanowski, G.

    2002-01-01

    This Paper investigates valuation effects of share block transfers and employs agency theory to explain the determinants of block premia. A sample of transactions from Poland is used to measure benefits and costs of ownership concentration. Block premia are found to be substantially lower than in

  7. Sampling and analysis plan for the consolidated sludge samples from the canisters and floor of the 105-K East basin

    International Nuclear Information System (INIS)

    BAKER, R.B.

    1999-01-01

    This Sampling and Analysis Plan (SAP) provides direction for sampling of fuel canister and floor Sludge from the K East Basin to complete the inventory of samples needed for Sludge treatment process testing. Sample volumes and sources consider recent reviews made by the Sludge treatment subproject. The representative samples will be characterized to the extent needed for the material to be used effectively for testing. Sampling equipment used allows drawing of large volume sludge samples and consolidation of sample material from a number of basin locations into one container. Once filled, the containers will be placed in a cask and transported to Hanford laboratories for recovery and evaluation. Included in the present SAP are the logic for sample location selection, laboratory analysis procedures required, and reporting needed to meet the Data Quality Objectives (DQOs) for this initiative

  8. Tracer gas diffusion sampling test plan

    International Nuclear Information System (INIS)

    Rohay, V.J.

    1993-01-01

    Efforts are under way to employ active and passive vapor extraction to remove carbon tetrachloride from the soil in the 200 West Area an the Hanford Site as part of the 200 West Area Carbon Tetrachloride Expedited Response Action. In the active approach, a vacuum is applied to a well, which causes soil gas surrounding the well to be drawn up to the surface. The contaminated air is cleaned by passage through a granular activated carbon bed. There are questions concerning the radius of influence associated with application of the vacuum system and related uncertainties about the soil-gas diffusion rates with and without the vacuum system present. To address these questions, a series of tracer gas diffusion sampling tests is proposed in which an inert, nontoxic tracer gas, sulfur hexafluoride (SF 6 ), will be injected into a well, and the rates of SF 6 diffusion through the surrounding soil horizon will be measured by sampling in nearby wells. Tracer gas tests will be conducted at sites very near the active vacuum extraction system and also at sites beyond the radius of influence of the active vacuum system. In the passive vapor extraction approach, barometric pressure fluctuations cause soil gas to be drawn to the surface through the well. At the passive sites, the effects of barometric ''pumping'' due to changes in atmospheric pressure will be investigated. Application of tracer gas testing to both the active and passive vapor extraction methods is described in the wellfield enhancement work plan (Rohay and Cameron 1993)

  9. Engineering task plan for the development, fabrication and installation of rotary mode core sample truck bellows

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    The Rotary Mode Core Sampling Trucks (RMSCTs) currently use a multi-sectioned bellows between the grapple box and the quill rod to compensate for drill head motion and to provide a path for purge gas. The current bellows, which is detailed on drawing H-2-690059, is expensive to procure, has a lengthy procurement cycle, and is prone to failure. Therefore, a task has been identified to design, fabricate, and install a replacement bellows. This Engineering Task Plan (ETP) is the management plan document for accomplishing the identified tasks. Any changes in scope of the ETP shall require formal direction by the Characterization Engineering manager. This document shall also be considered the work planning document for developmental control per Development Control Requirements (HNF 1999a). This Engineering Task Plan (ETP) is the management plan document for accomplishing the design, fabrication, and installation of a replacement bellows assembly for the Rotary Mode Core Sampling Trucks 3 and 4 (RMCST)

  10. DOE responses to Ecology review comments for ''Sampling and analysis plans for the 100-D Ponds voluntary remediation project''

    International Nuclear Information System (INIS)

    1996-01-01

    The Sampling and Analysis Plan describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds at the Hanford Reservation. This report contains responses by the US Department of Energy to Ecology review for ''Sampling and Analysis Plan for the 100-D Ponds Voluntary Remediation Project.''

  11. 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Stacy R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    The 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base has been prepared in accordance with the “Letter of Agreement Between Department of Energy, National Nuclear Security Administration, Sandia Field Office (DOE/NNSA/SFO) and 377th Air Base Wing (ABW), Kirtland Air Force Base (KAFB) for Terrestrial Sampling” (signed January 2017), Sandia National Laboratories, New Mexico (SNL/NM). The Letter of Agreement requires submittal of an annual terrestrial sampling plan.

  12. 2018 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base.

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Stacy R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-01-01

    The 2018 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base has been prepared in accordance with the “Letter of Agreement Between Department of Energy, National Nuclear Security Administration, Sandia Field Office (DOE/NNSA/SFO) and 377th Air Base Wing (ABW), Kirtland Air Force Base (KAFB) for Terrestrial Sampling” (signed January 2017), Sandia National Laboratories, New Mexico (SNL/NM). The Letter of Agreement requires submittal of an annual terrestrial sampling plan.

  13. Sampling and Analysis Plan for Verification Sampling of LANL-Derived Residual Radionuclides in Soils within Tract A-18-2 for Land Conveyance

    Energy Technology Data Exchange (ETDEWEB)

    Ruedig, Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-30

    Public Law 105-119 directs the U.S. Department of Energy (DOE) to convey or transfer parcels of land to the Incorporated County of Los Alamos or their designees and to the Department of Interior, Bureau of Indian Affairs, in trust for the Pueblo de San Ildefonso. Los Alamos National Security is tasked to support DOE in conveyance and/or transfer of identified land parcels no later than September 2022. Under DOE Order 458.1, Radiation Protection of the Public and the Environment (O458.1, 2013) and Los Alamos National Laboratory (LANL or the Laboratory) implementing Policy 412 (P412, 2014), real property with the potential to contain residual radioactive material must meet the criteria for clearance and release to the public. This Sampling and Analysis Plan (SAP) is a second investigation of Tract A-18-2 for the purpose of verifying the previous sampling results (LANL 2017). This sample plan requires 18 projectspecific soil samples for use in radiological clearance decisions consistent with LANL Procedure ENV-ES-TP-238 (2015a) and guidance in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM, 2000). The sampling work will be conducted by LANL, and samples will be evaluated by a LANL-contracted independent lab. However, there will be federal review (verification) of all steps of the sampling process.

  14. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site

  15. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  16. Tank 241-Z-361 vapor sampling and analysis plan

    Energy Technology Data Exchange (ETDEWEB)

    BANNING, D.L.

    1999-02-23

    Tank 241-Z-361 is identified in the Hanford Federal Facility Agreement and Consent Order (commonly referred to as the Tri-Party Agreement), Appendix C, (Ecology et al. 1994) as a unit to be remediated under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). As such, the U.S. Environmental Protection Agency will serve as the lead regulatory agency for remediation of this tank under the CERCLA process. At the time this unit was identified as a CERCLA site under the Tri-Party Agreement, it was placed within the 200-ZP-2 Operable Unit. In 1997, The Tri-parties redefined 200 Area Operable Units into waste groupings (Waste Site Grouping for 200 Areas Soils Investigations [DOE-RL 1992 and 1997]). A waste group contains waste sites that share similarities in geological conditions, function, and types of waste received. Tank 241-Z-361 is identified within the CERCLA Plutonium/Organic-rich Process Condensate/Process Waste Group (DOE-RL 1992). The Plutonium/Organic-rich Process Condensate/Process Waste Group has been prioritized for remediation beginning in the year 2004. Results of Tank 216-Z-361 sampling and analysis described in this Sampling and Analysis Plan (SAP) and in the SAP for sludge sampling (to be developed) will determine whether expedited response actions are required before 2004 because of the hazards associated with tank contents. Should data conclude that remediation of this tank should occur earlier than is planned for the other sites in the waste group, it is likely that removal alternatives will be analyzed in a separate Engineering Evaluation/Cost Analysis (EE/CA). Removal actions would proceed after the U.S. Environmental Protection Agency (EPA) signs an Action Memorandum describing the selected removal alternative for Tank 216-Z-361. If the data conclude that there is no immediate threat to human health and the environment from this tank, remedial actions for the tank will be defined in a

  17. UMTRA project water sampling and analysis plan, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1994-04-01

    The Monument Valley Uranium Mill Tailings Remedial Action (UMTRA) Project site in Cane Valley is a former uranium mill that has undergone surface remediation in the form of tailings and contaminated materials removal. Contaminated materials from the Monument Valley (Arizona) UMTRA Project site have been transported to the Mexican Hat (Utah) UMTRA Project site for consolidation with the Mexican Hat tailings. Tailings removal was completed in February 1994. Three geologic units at the site contain water: the unconsolidated eolian and alluvial deposits (alluvial aquifer), the Shinarump Conglomerate (Shinarump Member), and the De Chelly Sandstone. Water quality analyses indicate the contaminant plume has migrated north of the site and is mainly in the alluvial aquifer. An upward hydraulic gradient in the De Chelly Sandstone provides some protection to that aquifer. This water sampling and analysis plan recommends sampling domestic wells, monitor wells, and surface water in April and September 1994. The purpose of sampling is to continue periodic monitoring for the surface program, evaluate changes to water quality for site characterization, and provide data for the baseline risk assessment. Samples taken in April will be representative of high ground water levels and samples taken in September will be representative of low ground water levels. Filtered and nonfiltered samples will be analyzed for plume indicator parameters and baseline risk assessment parameters

  18. Planning spatial sampling of the soil from an uncertain reconnaissance variogram

    Science.gov (United States)

    Lark, R. Murray; Hamilton, Elliott M.; Kaninga, Belinda; Maseka, Kakoma K.; Mutondo, Moola; Sakala, Godfrey M.; Watts, Michael J.

    2017-12-01

    An estimated variogram of a soil property can be used to support a rational choice of sampling intensity for geostatistical mapping. However, it is known that estimated variograms are subject to uncertainty. In this paper we address two practical questions. First, how can we make a robust decision on sampling intensity, given the uncertainty in the variogram? Second, what are the costs incurred in terms of oversampling because of uncertainty in the variogram model used to plan sampling? To achieve this we show how samples of the posterior distribution of variogram parameters, from a computational Bayesian analysis, can be used to characterize the effects of variogram parameter uncertainty on sampling decisions. We show how one can select a sample intensity so that a target value of the kriging variance is not exceeded with some specified probability. This will lead to oversampling, relative to the sampling intensity that would be specified if there were no uncertainty in the variogram parameters. One can estimate the magnitude of this oversampling by treating the tolerable grid spacing for the final sample as a random variable, given the target kriging variance and the posterior sample values. We illustrate these concepts with some data on total uranium content in a relatively sparse sample of soil from agricultural land near mine tailings in the Copperbelt Province of Zambia.

  19. UMTRA project water sampling and analysis plan, Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1994-02-01

    This water sampling and analysis plan (WSAP) provides the basis for ground water sampling at the Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site during fiscal year 1994. It identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring locations and will be updated annually. The Ambrosia Lake site is in McKinley County, New Mexico, about 40 kilometers (km) (25 miles [mi]) north of Grants, New Mexico, and 1.6 km (1 mi) east of New Mexico Highway 509 (Figure 1.1). The town closest to the tailings pile is San Mateo, about 16 km ( 10 mi) southeast (Figure 1.2). The former mill and tailings pile are in Section 28, and two holding ponds are in Section 33, Township 14 North, Range 9 West. The site is shown on the US Geological Survey (USGS) map (USGS, 1980). The site is approximately 2100 meters (m) (7000 feet [ft]) above sea level

  20. Implementing reduced-risk integrated pest management in fresh-market cabbage: influence of sampling parameters, and validation of binomial sequential sampling plans for the cabbage looper (Lepidoptera Noctuidae).

    Science.gov (United States)

    Burkness, Eric C; Hutchison, W D

    2009-10-01

    Populations of cabbage looper, Trichoplusiani (Lepidoptera: Noctuidae), were sampled in experimental plots and commercial fields of cabbage (Brasicca spp.) in Minnesota during 1998-1999 as part of a larger effort to implement an integrated pest management program. Using a resampling approach and the Wald's sequential probability ratio test, sampling plans with different sampling parameters were evaluated using independent presence/absence and enumerative data. Evaluations and comparisons of the different sampling plans were made based on the operating characteristic and average sample number functions generated for each plan and through the use of a decision probability matrix. Values for upper and lower decision boundaries, sequential error rates (alpha, beta), and tally threshold were modified to determine parameter influence on the operating characteristic and average sample number functions. The following parameters resulted in the most desirable operating characteristic and average sample number functions; action threshold of 0.1 proportion of plants infested, tally threshold of 1, alpha = beta = 0.1, upper boundary of 0.15, lower boundary of 0.05, and resampling with replacement. We found that sampling parameters can be modified and evaluated using resampling software to achieve desirable operating characteristic and average sample number functions. Moreover, management of T. ni by using binomial sequential sampling should provide a good balance between cost and reliability by minimizing sample size and maintaining a high level of correct decisions (>95%) to treat or not treat.

  1. Microbiological sampling plan based on risk classification to verify supplier selection and production of served meals in food service operation.

    Science.gov (United States)

    Lahou, Evy; Jacxsens, Liesbeth; Van Landeghem, Filip; Uyttendaele, Mieke

    2014-08-01

    Food service operations are confronted with a diverse range of raw materials and served meals. The implementation of a microbial sampling plan in the framework of verification of suppliers and their own production process (functionality of their prerequisite and HACCP program), demands selection of food products and sampling frequencies. However, these are often selected without a well described scientifically underpinned sampling plan. Therefore, an approach on how to set-up a focused sampling plan, enabled by a microbial risk categorization of food products, for both incoming raw materials and meals served to the consumers is presented. The sampling plan was implemented as a case study during a one-year period in an institutional food service operation to test the feasibility of the chosen approach. This resulted in 123 samples of raw materials and 87 samples of meal servings (focused on high risk categorized food products) which were analyzed for spoilage bacteria, hygiene indicators and food borne pathogens. Although sampling plans are intrinsically limited in assessing the quality and safety of sampled foods, it was shown to be useful to reveal major non-compliances and opportunities to improve the food safety management system in place. Points of attention deduced in the case study were control of Listeria monocytogenes in raw meat spread and raw fish as well as overall microbial quality of served sandwiches and salads. Copyright © 2014 Elsevier Ltd. All rights reserved.

  2. Radiotherapy Facilities: Master Planning and Concept Design Considerations (Russian Edition)

    International Nuclear Information System (INIS)

    2015-01-01

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology and a typical project work plan, and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals

  3. TMI-2 accident evaluation program sample acquisition and examination plan. Executive summary

    International Nuclear Information System (INIS)

    Russell, M.L.; McCardell, R.K.; Broughton, J.M.

    1985-12-01

    The purpose of the TMI-2 Accident Evaluation Program Sample Acquisition and Examination (TMI-2 AEP SA and E) program is to develop and implement a test and inspection plan that completes the current-condition characterization of (a) the TMI-2 equipment that may have been damaged by the core damage events and (b) the TMI-2 core fission product inventory. The characterization program includes both sample acquisitions and examinations and in-situ measurements. Fission product characterization involves locating the fission products as well as determining their chemical form and determining material association

  4. RoBlock: a prototype autonomous manufacturing cell

    Science.gov (United States)

    Baekdal, Lars K.; Balslev, Ivar; Eriksen, Rene D.; Jensen, Soren P.; Jorgensen, Bo N.; Kirstein, Brian; Kristensen, Bent B.; Olsen, Martin M.; Perram, John W.; Petersen, Henrik G.; Petersen, Morten L.; Ruhoff, Peter T.; Skjolstrup, Carl E.; Sorensen, Anders S.; Wagenaar, Jeroen M.

    2000-10-01

    RoBlock is the first phase of an internally financed project at the Institute aimed at building a system in which two industrial robots suspended from a gantry, as shown below, cooperate to perform a task specified by an external user, in this case, assembling an unstructured collection of colored wooden blocks into a specified 3D pattern. The blocks are identified and localized using computer vision and grasped with a suction cup mechanism. Future phases of the project will involve other processes such as grasping and lifting, as well as other types of robot such as autonomous vehicles or variable geometry trusses. Innovative features of the control software system include: The use of an advanced trajectory planning system which ensures collision avoidance based on a generalization of the method of artificial potential fields, the use of a generic model-based controller which learns the values of parameters, including static and kinetic friction, of a detailed mechanical model of itself by comparing actual with planned movements, the use of fast, flexible, and robust pattern recognition and 3D-interpretation strategies, integration of trajectory planning and control with the sensor systems in a distributed Java application running on a network of PC's attached to the individual physical components. In designing this first stage, the aim was to build in the minimum complexity necessary to make the system non-trivially autonomous and to minimize the technological risks. The aims of this project, which is planned to be operational during 2000, are as follows: To provide a platform for carrying out experimental research in multi-agent systems and autonomous manufacturing systems, to test the interdisciplinary cooperation architecture of the Maersk Institute, in which researchers in the fields of applied mathematics (modeling the physical world), software engineering (modeling the system) and sensor/actuator technology (relating the virtual and real worlds) could

  5. Microbiological quality of sliced and block mozzarella cheese

    Directory of Open Access Journals (Sweden)

    Mariana Fontanetti Marinheiro

    2015-06-01

    Full Text Available The aim of this study was to verify the microbiological quality of mozzarella cheese sold in retail markets of Pelotas, Rio Grande do Sul, Brazil. Forty samples of mozzarella cheese were analyzed, comprising 20 samples of block cheese and 20 of sliced cheese. The cheese samples were analyzed for thermotolerant coliform counts and coagulase positive staphylococci counts, and presence of Salmonella spp and Listeria monocytogenes. The percentage of 12,5% and 5% of the sliced and block cheese samples analyzed, respectively, exceeded the microbiological standards accepted by Brazilian legislation. These results indicate the need for a better product monitoring and more concern with hygiene and sanitary practices during industrial process.

  6. Improving methodology in open vessel digestion with a graphite heating block (T7)

    International Nuclear Information System (INIS)

    Kainrath, P.; Conrads, B.; Ross, A.

    2002-01-01

    Full text: Open block digestion systems have been very popular in environmental analysis over the past decades, but have consistently suffered from the major drawback of their sensitivity against corrosion and the subsequent risk of contamination. Therefore block digestion systems have not been considered state-of-the-art technology in trace and ultra trace sample preparation. Graphite block digestion systems are well established in North America and are recently becoming more frequently considered in Europe. These systems overcome the deficiencies of the traditional systems, made from stainless steel or aluminum, because the block is manufactured from graphite and typically coated with a fluoro-polymer to present the possibility metallic contamination from the surface of the system during the handling of the samples. Graphite block systems present an alternative to the current mainstream technology of open and closed vessel microwave assisted digestion systems, as they allow large numbers of samples to be digested simultaneously, thus overcoming one of the major weaknesses of closed vessel systems. More recently a number of improvements in the technology has been developed for graphite block digestion systems and studies have been performed to evaluate the effects of such improvements. The paper presented will deal with the technological improvements: monitoring and control of sample temperature vs. monitoring of block temperature, elimination of cross contamination effects during open vessel block digestion, evaporation of samples for pre-concentration or multiple digestion steps, addressing the needs of various labs and applications for block digesters. The effects of those developments will be discussed; application examples and finally an outlook into possible future trends for graphite block digestion systems will be given. (author)

  7. The building blocks of a 'Liveable Neighbourhood': Identifying the key performance indicators for walking of an operational planning policy in Perth, Western Australia.

    Science.gov (United States)

    Hooper, Paula; Knuiman, Matthew; Foster, Sarah; Giles-Corti, Billie

    2015-11-01

    Planning policy makers are requesting clearer guidance on the key design features required to build neighbourhoods that promote active living. Using a backwards stepwise elimination procedure (logistic regression with generalised estimating equations adjusting for demographic characteristics, self-selection factors, stage of construction and scale of development) this study identified specific design features (n=16) from an operational planning policy ("Liveable Neighbourhoods") that showed the strongest associations with walking behaviours (measured using the Neighbourhood Physical Activity Questionnaire). The interacting effects of design features on walking behaviours were also investigated. The urban design features identified were grouped into the "building blocks of a Liveable Neighbourhood", reflecting the scale, importance and sequencing of the design and implementation phases required to create walkable, pedestrian friendly developments. Copyright © 2015 Elsevier Ltd. All rights reserved.

  8. A sample lesson plan for the course English Composition II

    Directory of Open Access Journals (Sweden)

    Córdoba Cubillo, Patricia

    2005-03-01

    Full Text Available The goal of this article is to present a lesson plan and a series of sample tasks to help the instructors from the course English Composition II, at the School of Modern Languages from the University of Costa Rica, to guide students write an essay integrating the four skills: listening, speaking, reading, and writing. These activities will be a source of comprehensible input for the learners that will hopefully result in a good writing piece. El objetivo de este artículo es presentar un plan de lección y una serie de actividades que le ayudarán a los y las instructoras del curso Composición Inglesa II de la Escuela de Lenguas Modernas de la Universidad de Costa Rica a guiar a sus estudiantes a escribir un ensayo integrando las cuatro macro-destrezas, a saber comprensión auditiva, conversación, lectura y escritura. Mediante estas actividades se espera que los estudiantes elaboren un ensayo de calidad.

  9. Tank 241-SX-105 rotary mode core sampling and analysis plan

    International Nuclear Information System (INIS)

    Simpson, B.C.

    1998-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for rotary mode core samples from tank 241-SX-105 (SX-105). It is written in accordance with Tank Safety Screening Data Quality Objective (Dukelow et al. 1995) and Memorandum of Understanding for the Organic Complexant Safety Issue Data Requirements (Schreiber 1997a). Vapor screening issues apply as well, but are outside the scope of this SAP. A physical profile prediction based on waste fill history and previous sampling information is provided in Appendix A. Prior to core sampling, the dome space (below the riser) shall be measured for the presence of flammable gases. The measurement shall be taken from within the dome space and the data reported as a percentage of the lower flammability limit (LFL). The results shall be transmitted to the tank coordinator within ten working days of the sampling event (Schreiber 1997b). If the results are above 25 percent of the LFL when analyzing by gas chromatography/mass spectrometry or gas-specific monitoring gauges or above 10% of the LFL when analyzing with a combustible gas meter, the necessity for recurring sampling for flammable gas concentration and the frequency of such sampling will be determined by the Flammable Gas Safety Project. Any additional vapor sampling is not within the scope of this SAP

  10. An Agent-Based Solution Framework for Inter-Block Yard Crane Scheduling Problems

    Directory of Open Access Journals (Sweden)

    Omor Sharif

    2012-06-01

    Full Text Available The efficiency of yard operations is critical to the overall productivity of a container terminal because the yard serves as the interface between the landside and waterside operations. Most container terminals use yard cranes to transfer containers between the yard and trucks (both external and internal. To facilitate vessel operations, an efficient work schedule for the yard cranes is necessary given varying work volumes among yard blocks with different planning periods. This paper investigated an agent-based approach to assign and relocate yard cranes among yard blocks based on the forecasted work volumes. The goal of our study is to reduce the work volume that remains incomplete at the end of a planning period. We offered several preference functions for yard cranes and blocks which are modeled as agents. These preference functions are designed to find effective schedules for yard cranes. In addition, we examined various rules for the initial assignment of yard cranes to blocks. Our analysis demonstrated that our model can effectively and efficiently reduce the percentage of incomplete work volume for any real-world sized problem.

  11. Orientation: Automotive Mechanics Instructional Program. Block 1.

    Science.gov (United States)

    O'Brien, Ralph D.

    The first six instructional blocks in automotive mechanics, the lessons and supportive information in the document provide a guide for teachers in planning an instructional program in the basic theory and practice of a beginning course at the secondary and post-secondary level. The material, as organized, is a suggested sequence of instruction…

  12. Assessment of Single European Sky Implementation in the Functional Airspace Block Central Europe

    Directory of Open Access Journals (Sweden)

    Tomislav Mihetec

    2017-12-01

    implementation is performed through sub-regional grouping of Air Navigation Service Providers in a form of Functional Airspace Blocks. This paper analyses the level of implementation of ATM-related projects in the Functional Airspace Block Central Europe and their relation to other Functional Airspace Blocks defined in Europe. From this paper it is obvious that even though the planning of Single European Sky projects is based on the collaborative implementation of Functional Airspace Block level, the real implementation is fragmented and based on national levels.

  13. Mission Planning and Decision Support for Underwater Glider Networks: A Sampling on-Demand Approach.

    Science.gov (United States)

    Ferri, Gabriele; Cococcioni, Marco; Alvarez, Alberto

    2015-12-26

    This paper describes an optimal sampling approach to support glider fleet operators and marine scientists during the complex task of planning the missions of fleets of underwater gliders. Optimal sampling, which has gained considerable attention in the last decade, consists in planning the paths of gliders to minimize a specific criterion pertinent to the phenomenon under investigation. Different criteria (e.g., A, G, or E optimality), used in geosciences to obtain an optimum design, lead to different sampling strategies. In particular, the A criterion produces paths for the gliders that minimize the overall level of uncertainty over the area of interest. However, there are commonly operative situations in which the marine scientists may prefer not to minimize the overall uncertainty of a certain area, but instead they may be interested in achieving an acceptable uncertainty sufficient for the scientific or operational needs of the mission. We propose and discuss here an approach named sampling on-demand that explicitly addresses this need. In our approach the user provides an objective map, setting both the amount and the geographic distribution of the uncertainty to be achieved after assimilating the information gathered by the fleet. A novel optimality criterion, called A η , is proposed and the resulting minimization problem is solved by using a Simulated Annealing based optimizer that takes into account the constraints imposed by the glider navigation features, the desired geometry of the paths and the problems of reachability caused by ocean currents. This planning strategy has been implemented in a Matlab toolbox called SoDDS (Sampling on-Demand and Decision Support). The tool is able to automatically download the ocean fields data from MyOcean repository and also provides graphical user interfaces to ease the input process of mission parameters and targets. The results obtained by running SoDDS on three different scenarios are provided and show that So

  14. Mission Planning and Decision Support for Underwater Glider Networks: A Sampling on-Demand Approach

    Directory of Open Access Journals (Sweden)

    Gabriele Ferri

    2015-12-01

    Full Text Available This paper describes an optimal sampling approach to support glider fleet operators and marine scientists during the complex task of planning the missions of fleets of underwater gliders. Optimal sampling, which has gained considerable attention in the last decade, consists in planning the paths of gliders to minimize a specific criterion pertinent to the phenomenon under investigation. Different criteria (e.g., A, G, or E optimality, used in geosciences to obtain an optimum design, lead to different sampling strategies. In particular, the A criterion produces paths for the gliders that minimize the overall level of uncertainty over the area of interest. However, there are commonly operative situations in which the marine scientists may prefer not to minimize the overall uncertainty of a certain area, but instead they may be interested in achieving an acceptable uncertainty sufficient for the scientific or operational needs of the mission. We propose and discuss here an approach named sampling on-demand that explicitly addresses this need. In our approach the user provides an objective map, setting both the amount and the geographic distribution of the uncertainty to be achieved after assimilating the information gathered by the fleet. A novel optimality criterion, called A η , is proposed and the resulting minimization problem is solved by using a Simulated Annealing based optimizer that takes into account the constraints imposed by the glider navigation features, the desired geometry of the paths and the problems of reachability caused by ocean currents. This planning strategy has been implemented in a Matlab toolbox called SoDDS (Sampling on-Demand and Decision Support. The tool is able to automatically download the ocean fields data from MyOcean repository and also provides graphical user interfaces to ease the input process of mission parameters and targets. The results obtained by running SoDDS on three different scenarios are provided

  15. Mission Planning and Decision Support for Underwater Glider Networks: A Sampling on-Demand Approach

    Science.gov (United States)

    Ferri, Gabriele; Cococcioni, Marco; Alvarez, Alberto

    2015-01-01

    This paper describes an optimal sampling approach to support glider fleet operators and marine scientists during the complex task of planning the missions of fleets of underwater gliders. Optimal sampling, which has gained considerable attention in the last decade, consists in planning the paths of gliders to minimize a specific criterion pertinent to the phenomenon under investigation. Different criteria (e.g., A, G, or E optimality), used in geosciences to obtain an optimum design, lead to different sampling strategies. In particular, the A criterion produces paths for the gliders that minimize the overall level of uncertainty over the area of interest. However, there are commonly operative situations in which the marine scientists may prefer not to minimize the overall uncertainty of a certain area, but instead they may be interested in achieving an acceptable uncertainty sufficient for the scientific or operational needs of the mission. We propose and discuss here an approach named sampling on-demand that explicitly addresses this need. In our approach the user provides an objective map, setting both the amount and the geographic distribution of the uncertainty to be achieved after assimilating the information gathered by the fleet. A novel optimality criterion, called Aη, is proposed and the resulting minimization problem is solved by using a Simulated Annealing based optimizer that takes into account the constraints imposed by the glider navigation features, the desired geometry of the paths and the problems of reachability caused by ocean currents. This planning strategy has been implemented in a Matlab toolbox called SoDDS (Sampling on-Demand and Decision Support). The tool is able to automatically download the ocean fields data from MyOcean repository and also provides graphical user interfaces to ease the input process of mission parameters and targets. The results obtained by running SoDDS on three different scenarios are provided and show that So

  16. Sampling and Analysis Plan for N-Springs ERA pump-and-treat waste media

    International Nuclear Information System (INIS)

    Stankovich, M.T.

    1996-07-01

    This Sampling and Analysis Plan details the administrative procedures to be used to conduct sampling activities for characterization of spent ion-exchange resin, clinoptilolite, generated from the N-Springs pump-and-treat expedited response action. N-Springs (riverbank seeps) is located in the 100-N Area of the Hanford Site. Groundwater contained in the 100-NR-2 Operable Unit is contaminated with various radionuclides derived from wastewater disposal practices and spills associated with 100-N Reactor Operations

  17. Sampling and analysis plan (SAP) for WESF drains and TK-100 sump

    International Nuclear Information System (INIS)

    Simmons, F.M.

    1998-01-01

    The intent of this project is to determine whether the Waste Encapsulation and Storage Facility (WESF) floor drain piping and the TK-100 sump are free from contamination. TK-100 is currently used as a catch tank to transfer low level liquid waste from WESF to Tank Farms via B Plant. This system is being modified as part of the WESF decoupling since B Plant is being deactivated. As a result of the 1,1,1-trichloroethane (TCA) discovery in TK-100, the associated WESF floor drains and the pit sump need to be sampled. Breakdown constituents have been reviewed and found to be non-hazardous. There are 29 floor drains that tie into a common header leading into the tank. To prevent high exposure during sampling of the drains, TK-100 will be removed into the B Plant canyon and a new tank will be placed in the pit before any floor drain samples are taken. The sump will be sampled prior to TK-100 removal. A sample of the sludge and any liquid in the sump will be taken and analyzed for TCA and polychlorinated biphenyl (PCB). After the sump has been sampled, the vault floor will be flushed. The flush will be transferred from the sump into TK-100. TK-100 will be moved into B Plant. The vault will then be cleaned of debris and visually inspected. If there is no visual indication of TCA or PCB staining, the vault will be painted and a new tank installed. If there is an indication of TCA or PCB from laboratory analysis or staining, further negotiations will be required to determine a path forward. A total of 8 sets of three 40ml samples will be required for all of the floor drains and sump. The sump set will include one 125ml solid sample. The only analysis required will be for TCA in liquids. PCBs will be checked in sump solids only. The Sampling and Analysis Plan (SAP) is written to provide direction for the sampling and analytical activities of the 29 WESF floor drains and the TK-100 sump. The intent of this plan is to define the responsibilities of the various organizations

  18. Sampling and Analysis Plan for Tank 241-AP-108 Waste in Support of Evaporator Campaign 2000-1

    International Nuclear Information System (INIS)

    RASMUSSEN, J.H.

    2000-01-01

    This Tank Sampling and Analysis Plan (TSAP) identifies sample collection, laboratory analysis, quality assurance/quality control (QA/QC), and reporting objectives for the characterization of tank 241-AP-108 waste. Technical bases for these objectives are specified in the 242-A Evaporator Data Quality Objectives (Bowman 2000 and Von Bargen 1998) and 108-AP Tank Sampling Requirements in Support of Evaporator Campaign 2000-1 (Le 2000). Evaporator campaign 2000-1 will process waste from tank 241-AP-108 in addition to that from tank 241-AP-107. Characterization results will be used to support the evaporator campaign currently planned for early fiscal year 2000. No other needs (or issues) requiring data for this tank waste apply to this sampling event

  19. University of TX Bureau of Economic Geology's Core Research Centers: The Time is Right for Registering Physical Samples and Assigning IGSN's - Workflows, Stumbling Blocks, and Successes.

    Science.gov (United States)

    Averett, A.; DeJarnett, B. B.

    2016-12-01

    The University Of Texas Bureau Of Economic Geology (BEG) serves as the geological survey for Texas and operates three geological sample repositories that house well over 2 million boxes of geological samples (cores and cuttings) and an abundant amount of geoscience data (geophysical logs, thin sections, geochemical analyses, etc.). Material is accessible and searchable online, and it is publically available to the geological community for research and education. Patrons access information about our collection by using our online core and log database (SQL format). BEG is currently undertaking a large project to: 1) improve the internal accuracy of metadata associated with the collection; 2) enhance the capabilities of the database for both BEG curators and researchers as well as our external patrons; and 3) ensure easy and efficient navigation for patrons through our online portal. As BEG undertakes this project, BEG is in the early stages of planning to export the metadata for its collection into SESAR (System for Earth Sample Registration) and have IGSN's (International GeoSample Numbers) assigned to its samples. Education regarding the value of IGSN's and an external registry (SESAR) has been crucial to receiving management support for the project because the concept and potential benefits of registering samples in a registry outside of the institution were not well-known prior to this project. Potential benefits such as increases in discoverability, repository recognition in publications, and interoperability were presented. The project was well-received by management, and BEG fully supports the effort to register our physical samples with SESAR. Since BEG is only in the initial phase of this project, any stumbling blocks, workflow issues, successes/failures, etc. can only be predicted at this point, but by mid-December, BEG expects to have several concrete issues to present in the session. Currently, our most pressing issue involves establishing the most

  20. Ship Block Transportation Scheduling Problem Based on Greedy Algorithm

    Directory of Open Access Journals (Sweden)

    Chong Wang

    2016-05-01

    Full Text Available Ship block transportation problems are crucial issues to address in reducing the construction cost and improving the productivity of shipyards. Shipyards aim to maximize the workload balance of transporters with time constraint such that all blocks should be transported during the planning horizon. This process leads to three types of penalty time: empty transporter travel time, delay time, and tardy time. This study aims to minimize the sum of the penalty time. First, this study presents the problem of ship block transportation with the generalization of the block transportation restriction on the multi-type transporter. Second, the problem is transformed into the classical traveling salesman problem and assignment problem through a reasonable model simplification and by adding a virtual node to the proposed directed graph. Then, a heuristic algorithm based on greedy algorithm is proposed to assign blocks to available transporters and sequencing blocks for each transporter simultaneously. Finally, the numerical experiment method is used to validate the model, and its result shows that the proposed algorithm is effective in realizing the efficient use of the transporters in shipyards. Numerical simulation results demonstrate the promising application of the proposed method to efficiently improve the utilization of transporters and to reduce the cost of ship block logistics for shipyards.

  1. Sampling and analysis plan for assessment of beryllium in soils surrounding TA-40 building 15

    Energy Technology Data Exchange (ETDEWEB)

    Ruedig, Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-12-19

    Technical Area (TA) 40 Building 15 (40-15) is an active firing site at Los Alamos National Laboratory. The weapons facility operations (WFO) group plans to build an enclosure over the site in 2017, so that test shots may be conducted year-round. The enclosure project is described in PRID 16P-0209. 40-15 is listed on LANL OSH-ISH’s beryllium inventory, which reflects the potential for beryllium in/on soils and building surfaces at 40-15. Some areas in and around 40-15 have previously been sampled for beryllium, but past sampling efforts did not achieve complete spatial coverage of the area. This Sampling and Analysis Plan (SAP) investigates the area surrounding 40-15 via 9 deep (≥1-ft.) soil samples and 11 shallow (6-in.) soil samples. These samples will fill the spatial data gaps for beryllium at 40-15, and will be used to support OSH-ISH’s final determination of 40-15’s beryllium registry status. This SAP has been prepared by the Environmental Health Physics program in consultation with the Industrial Hygiene program. Industrial Hygiene is the owner of LANL’s beryllium program, and will make a final determination with regard to the regulatory status of beryllium at 40-15.

  2. Analysis of Block OMP using Block RIP

    OpenAIRE

    Wang, Jun; Li, Gang; Zhang, Hao; Wang, Xiqin

    2011-01-01

    Orthogonal matching pursuit (OMP) is a canonical greedy algorithm for sparse signal reconstruction. When the signal of interest is block sparse, i.e., it has nonzero coefficients occurring in clusters, the block version of OMP algorithm (i.e., Block OMP) outperforms the conventional OMP. In this paper, we demonstrate that a new notion of block restricted isometry property (Block RIP), which is less stringent than standard restricted isometry property (RIP), can be used for a very straightforw...

  3. Analysis of ground water and soil samples from severely arsenic affected blocks of Murshidabad district

    Directory of Open Access Journals (Sweden)

    Manali Biswas

    2017-10-01

    Full Text Available Contamination of groundwater and soil by arsenic is a serious threat to existence of mankind on the globe. Arsenic contaminates soil and groundwater by natural biogeochemical cycles. However, due to anthropogenic activities like indiscriminant use of arsenic in disinfectants, weedicides, medicines and fertilizers, arsenic toxicity is a severe environmental issue, both at national and global level. U.S. Environmental Protection Agency and World Health Organization prescribed the permissible limit of arsenic in drinking water to be 10 µg/l. Exposure to arsenic at higher levels over a considerable period of time leads to skin lesions and cancer, disorders of cardiovascular, respiratory, gastrointestinal, hepatic and renal systems. Murshidabad is one of the severely arsenic affected districts of West Bengal. We have analyzed soil and groundwater samples from some of the highly arsenic affected blocks of Murshidabad district. Both the soil and groundwater samples have an alkaline pH, a characteristic of the presence of arsenic in the tested samples. Unfortunately, the socio-economic conditions of these villages force the residents to use groundwater as the source of drinking water. Presence of considerably high amount of total dissolved solids in water samples make them further unfit for consumption. High amount of phosphate and iron present in some of the water samples takes a toll on the detoxification and excretory system of the body, if those water samples are consumed on a regular manner. Contamination of soil by the aforesaid contaminants results in biomagnification of these pollutants in the food chain. We could also isolate certain potentially arsenic resistant bacteria from the contaminated soil and water samples. At the next level we have surveyed an arsenic affected village to analyze the clinical manifestation of arsenic poisoning. In this village subjects developed rampant skin lesions throughout the body due to exposure to arsenic

  4. 31 CFR 595.301 - Blocked account; blocked property.

    Science.gov (United States)

    2010-07-01

    ... (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM SANCTIONS REGULATIONS General Definitions § 595.301 Blocked account; blocked property. The terms blocked account and blocked...

  5. Sampling and Analysis Plan for Supplemental Environmental Project: Aquatic Life Surveys

    Energy Technology Data Exchange (ETDEWEB)

    Berryhill, Jesse Tobias [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gaukler, Shannon Marie [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-26

    As part of a settlement agreement for nuclear waste incidents in 2014, several supplemental environment projects (SEPs) were initiated at Los Alamos National Laboratory (LANL or the Laboratory) between the U.S. Department of Energy and the state of New Mexico. One SEP from this agreement consists of performing aquatic life surveys and will be used to assess the applicability of using generic ambient water-quality criteria (AWQC) for aquatic life. AWQC are generic criteria developed by the U.S. Environmental Protection Agency (EPA) to cover a broad range of aquatic species and are not unique to a specific region or state. AWQC are established by a composition of toxicity data, called species sensitivity distributions (SSDs), and are determined by LC50 (lethal concentration of 50% of the organisms studied) acute toxicity experiments for chemicals of interest. It is of interest to determine whether aquatic species inhabiting waters on the Pajarito Plateau are adequately protected using the current generic AWQC. The focus of this study will determine which aquatic species are present in ephemeral, intermittent, and perennial waters within LANL boundaries and from reference waters adjacent to LANL. If the species identified from these waters do not generally represent species used in the SSDs, then SSDs may need to be modified and AWQC may need to be updated. This sampling and analysis plan details the sampling methodology, surveillance locations, temporal scheduling, and analytical approaches that will be used to complete aquatic life surveys. A significant portion of this sampling and analysis plan was formalized by referring to Appendix E: SEP Aquatic Life Surveys DQO (Data Quality Objectives).

  6. ANALYSING ACCEPTANCE SAMPLING PLANS BY MARKOV CHAINS

    Directory of Open Access Journals (Sweden)

    Mohammad Mirabi

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: In this research, a Markov analysis of acceptance sampling plans in a single stage and in two stages is proposed, based on the quality of the items inspected. In a stage of this policy, if the number of defective items in a sample of inspected items is more than the upper threshold, the batch is rejected. However, the batch is accepted if the number of defective items is less than the lower threshold. Nonetheless, when the number of defective items falls between the upper and lower thresholds, the decision-making process continues to inspect the items and collect further samples. The primary objective is to determine the optimal values of the upper and lower thresholds using a Markov process to minimise the total cost associated with a batch acceptance policy. A solution method is presented, along with a numerical demonstration of the application of the proposed methodology.

    AFRIKAANSE OPSOMMING: In hierdie navorsing word ’n Markov-ontleding gedoen van aannamemonsternemingsplanne wat plaasvind in ’n enkele stap of in twee stappe na gelang van die kwaliteit van die items wat geïnspekteer word. Indien die eerste monster toon dat die aantal defektiewe items ’n boonste grens oorskry, word die lot afgekeur. Indien die eerste monster toon dat die aantal defektiewe items minder is as ’n onderste grens, word die lot aanvaar. Indien die eerste monster toon dat die aantal defektiewe items in die gebied tussen die boonste en onderste grense lê, word die besluitnemingsproses voortgesit en verdere monsters word geneem. Die primêre doel is om die optimale waardes van die booonste en onderste grense te bepaal deur gebruik te maak van ’n Markov-proses sodat die totale koste verbonde aan die proses geminimiseer kan word. ’n Oplossing word daarna voorgehou tesame met ’n numeriese voorbeeld van die toepassing van die voorgestelde oplossing.

  7. Ultrasound-Guided Multiple Peripheral Nerve Blocks in a Superobese Patient

    Directory of Open Access Journals (Sweden)

    Alper Kilicaslan

    2014-01-01

    Full Text Available The number of obese patients has increased dramatically worldwide. Morbid obesity is associated with an increased incidence of medical comorbidities and restricts the application choices in anesthesiology. We report a successfully performed combined ultrasound-guided blockade of the femoral, tibial, and common peroneal nerve in a superobese patient. We present a case report of a 31-year-old, ASA-PS II, super obese man (190 kg, 180 cm, BMI: 58 kg/m2 admitted to the emergency department with a type II segmental tibia shaft fracture and ankle dislocation after a vehicle accident. After two failed spinal anesthesia attempts, we decided to apply a femoral block combined with a sciatic block. Femoral blocks were successfully performed with US guided in-plane technique. Separate blocks of the tibial and common peroneal nerves were planned after the sciatic nerve could not be located due to the thick subcutaneous tissue. We performed a tibial nerve block at 2 cm above the popliteal crease and common peroneal nerve at the level of the fibular head with US guided in-plane technique. The blocks were successful and no block-related complications were noted. Ultrasound guidance allows new approaches for multiple peripheral nerve blocks with low local anesthetic doses in obese patients.

  8. Nerve Blocks

    Science.gov (United States)

    ... News Physician Resources Professions Site Index A-Z Nerve Blocks A nerve block is an injection to ... the limitations of Nerve Block? What is a Nerve Block? A nerve block is an anesthetic and/ ...

  9. FIRM: Sampling-based feedback motion-planning under motion uncertainty and imperfect measurements

    KAUST Repository

    Agha-mohammadi, A.-a.; Chakravorty, S.; Amato, N. M.

    2013-01-01

    In this paper we present feedback-based information roadmap (FIRM), a multi-query approach for planning under uncertainty which is a belief-space variant of probabilistic roadmap methods. The crucial feature of FIRM is that the costs associated with the edges are independent of each other, and in this sense it is the first method that generates a graph in belief space that preserves the optimal substructure property. From a practical point of view, FIRM is a robust and reliable planning framework. It is robust since the solution is a feedback and there is no need for expensive replanning. It is reliable because accurate collision probabilities can be computed along the edges. In addition, FIRM is a scalable framework, where the complexity of planning with FIRM is a constant multiplier of the complexity of planning with PRM. In this paper, FIRM is introduced as an abstract framework. As a concrete instantiation of FIRM, we adopt stationary linear quadratic Gaussian (SLQG) controllers as belief stabilizers and introduce the so-called SLQG-FIRM. In SLQG-FIRM we focus on kinematic systems and then extend to dynamical systems by sampling in the equilibrium space. We investigate the performance of SLQG-FIRM in different scenarios. © The Author(s) 2013.

  10. FIRM: Sampling-based feedback motion-planning under motion uncertainty and imperfect measurements

    KAUST Repository

    Agha-mohammadi, A.-a.

    2013-11-15

    In this paper we present feedback-based information roadmap (FIRM), a multi-query approach for planning under uncertainty which is a belief-space variant of probabilistic roadmap methods. The crucial feature of FIRM is that the costs associated with the edges are independent of each other, and in this sense it is the first method that generates a graph in belief space that preserves the optimal substructure property. From a practical point of view, FIRM is a robust and reliable planning framework. It is robust since the solution is a feedback and there is no need for expensive replanning. It is reliable because accurate collision probabilities can be computed along the edges. In addition, FIRM is a scalable framework, where the complexity of planning with FIRM is a constant multiplier of the complexity of planning with PRM. In this paper, FIRM is introduced as an abstract framework. As a concrete instantiation of FIRM, we adopt stationary linear quadratic Gaussian (SLQG) controllers as belief stabilizers and introduce the so-called SLQG-FIRM. In SLQG-FIRM we focus on kinematic systems and then extend to dynamical systems by sampling in the equilibrium space. We investigate the performance of SLQG-FIRM in different scenarios. © The Author(s) 2013.

  11. Sampling and Analysis Plan for the 105-N Basin Water

    International Nuclear Information System (INIS)

    R.O. Mahood

    1997-01-01

    This sampling and analysis plan defines the strategy, and field and laboratory methods that will be used to characterize 105-N Basin water. The water will be shipped to the 200 Area Effluent Treatment Facility for treatment and disposal as part of N Reactor deactivation. These analyses are necessary to ensure that the water will meet the acceptance criteria of the ETF, as established in the Memorandum of Understanding for storage and treatment of water from N-Basin (Appendix A), and the characterization requirements for 100-N Area water provided in a letter from ETF personnel (Appendix B)

  12. SANS study of coated block copolymer micelles

    Czech Academy of Sciences Publication Activity Database

    Pleštil, Josef; Kříž, Jaroslav; Koňák, Čestmír; Pospíšil, Herman; Kadlec, Petr; Sedláková, Zdeňka; Grillo, I.; Cubitt, R.

    2005-01-01

    Roč. 206, č. 12 (2005), s. 1206-1215 ISSN 1022-1352 R&D Projects: GA ČR GA203/03/0600; GA AV ČR IAA1050201; GA AV ČR KSK4050111 Institutional research plan: CEZ:AV0Z40500505 Keywords : block copolymer micelles * core-shell polymers * nanoparticles Subject RIV: CD - Macromolecular Chemistry Impact factor: 2.111, year: 2005

  13. Planning Considerations for a Mars Sample Receiving Facility: Summary and Interpretation of Three Design Studies

    Science.gov (United States)

    Beaty, David W.; Allen, Carlton C.; Bass, Deborah S.; Buxbaum, Karen L.; Campbell, James K.; Lindstrom, David J.; Miller, Sylvia L.; Papanastassiou, Dimitri A.

    2009-10-01

    It has been widely understood for many years that an essential component of a Mars Sample Return mission is a Sample Receiving Facility (SRF). The purpose of such a facility would be to take delivery of the flight hardware that lands on Earth, open the spacecraft and extract the sample container and samples, and conduct an agreed-upon test protocol, while ensuring strict containment and contamination control of the samples while in the SRF. Any samples that are found to be non-hazardous (or are rendered non-hazardous by sterilization) would then be transferred to long-term curation. Although the general concept of an SRF is relatively straightforward, there has been considerable discussion about implementation planning. The Mars Exploration Program carried out an analysis of the attributes of an SRF to establish its scope, including minimum size and functionality, budgetary requirements (capital cost, operating costs, cost profile), and development schedule. The approach was to arrange for three independent design studies, each led by an architectural design firm, and compare the results. While there were many design elements in common identified by each study team, there were significant differences in the way human operators were to interact with the systems. In aggregate, the design studies provided insight into the attributes of a future SRF and the complex factors to consider for future programmatic planning.

  14. Testing block subdivision algorithms on block designs

    Science.gov (United States)

    Wiseman, Natalie; Patterson, Zachary

    2016-01-01

    Integrated land use-transportation models predict future transportation demand taking into account how households and firms arrange themselves partly as a function of the transportation system. Recent integrated models require parcels as inputs and produce household and employment predictions at the parcel scale. Block subdivision algorithms automatically generate parcel patterns within blocks. Evaluating block subdivision algorithms is done by way of generating parcels and comparing them to those in a parcel database. Three block subdivision algorithms are evaluated on how closely they reproduce parcels of different block types found in a parcel database from Montreal, Canada. While the authors who developed each of the algorithms have evaluated them, they have used their own metrics and block types to evaluate their own algorithms. This makes it difficult to compare their strengths and weaknesses. The contribution of this paper is in resolving this difficulty with the aim of finding a better algorithm suited to subdividing each block type. The proposed hypothesis is that given the different approaches that block subdivision algorithms take, it's likely that different algorithms are better adapted to subdividing different block types. To test this, a standardized block type classification is used that consists of mutually exclusive and comprehensive categories. A statistical method is used for finding a better algorithm and the probability it will perform well for a given block type. Results suggest the oriented bounding box algorithm performs better for warped non-uniform sites, as well as gridiron and fragmented uniform sites. It also produces more similar parcel areas and widths. The Generalized Parcel Divider 1 algorithm performs better for gridiron non-uniform sites. The Straight Skeleton algorithm performs better for loop and lollipop networks as well as fragmented non-uniform and warped uniform sites. It also produces more similar parcel shapes and patterns.

  15. A Decision Support Tool for Planning the Sampling of Tank 19

    International Nuclear Information System (INIS)

    Edwards, T.B.

    2002-01-01

    The Statistical Consulting Section (SCS) of the Savannah River Technology Center (SRTC) was asked to develop a decision support system (DSS) to aid in the planning of the process to characterize the heel of Tank 19. This characterization is to be based on samples of the tank heel, and the DSS is to be used to help determine the number of samples that might be needed to provide a meaningful characterization based upon assumptions for relevant variations and volumes. The objective of this report is to describe the framework used to develop the DSS and to document its calculations. The DSS was developed as a Microsoft Excel spreadsheet. Detailed input and output for two test cases are provided in the appendix as part of the documentation of this spreadsheet

  16. Morphological and physical characterization of poly(styrene-isobutylene-styrene) block copolymers and ionomers thereof

    Science.gov (United States)

    Baugh, Daniel Webster, III

    Poly(styrene-isobutylene-styrene) block copolymers made by living cationic polymerization using a difunctional initiator and the sequential monomer addition technique were analyzed using curve-resolution software in conjunction with high-resolution GPC. Fractional precipitation and selective solvent extraction were applied to a representative sample in order to confirm the identity of contaminating species. The latter were found to be low molecular weight polystyrene homopolymer, diblock copolymer, and higher molecular weight segmented block copolymers formed by intermolecular electrophilic aromatic substitution linking reactions occurring late in the polymerization of the styrene outer blocks. Solvent-cast films of poly(styrene-isobutylene-styrene) (PS-PIB-PS) block copolymers and block ionomers were analyzed using small-angle X-ray scattering (SAXS) and transmission electron microscopy (TEM). Four block copolymer samples with center block molecular weights of 52,000 g/mol and PS volume fractions (o sbPS) ranging from 0.17 to 0.31 were studied. All samples exhibited hexagonally packed cylinders of PS within the PIB matrix. Cylinder spacing was in the range 32 to 36 nm for most samples, while cylinder diameters varied from 14 to 21 nm. Porod analysis of the scattering data indicated the presence of isolated phase mixing and sharp phase boundaries. PS-PIB-PS block copolymers and ionomers therefrom were analyzed using dynamic mechanical analysis (DMA) and tensile testing. The study encompassed five block copolymer samples with similar PIB center blocks with molecular weights of approx52,000 g/mol and PS weight fractions ranging from 0.127 to 0.337. Ionomers were prepared from two of these materials by lightly sulfonating the PS outer blocks. Sulfonation levels varied from 1.7 to 4.7 mol % and the sodium and potassium neutralized forms were compared to the parent block copolymers. Dynamic mechanical analysis (DMA) of the block copolymer films indicated the existence

  17. The first urban plan of Uzice from 1863.

    Directory of Open Access Journals (Sweden)

    Kuzović Duško

    2012-01-01

    Full Text Available Urban plan for Uzice from 1863. started urban reforming of settlement. Historical events in 1862. set the basis: great fire and emigration of Turks from the city which reduced number from 5700 to 2490 inhabitants. At the same time, financial capacity of population weakened and that affected to dynamics of reconstruction. Sketch of current state from 1863. represents first geodetic record of the town. It provides important information about town state during Turkish occupation. On sketch of current state after the fire are seen unequal width winding streets, blocks with irregular borders, streams flowing freely through town, and, in the town center, a large cemetery which divides the town and prevents further development. According to the sketch was made the First regulation proposal on May 1863. (eng. Emanuel Shefel which included identical surface as area destroyed in the fire. With this plan cemetery located in center was abolished, regulation of river Djetinja and steam Uremovac was planned, formed two blocks at expense of river regulation, street routes were straightened, street axle fractures were planned only in areas of intersections, block boundaries realigned, blocks got proper geometry, and around the church and district office was formed a town market from which poured out the main street - carsija. Problems of this proposalwere that it envisaged small number of town markets, in relation to economic importance of the town and inappropriate main street solution. In order to help in rewriting the plan in the town were sent engineers Josip Klinar (from Cacak and Joseph Veseli (from Loznica. Together with E. Sefel they have made Second plan proposal: thay have expanded plan intervention to north (Military Circle, to west (stream Kostica, on cemetary space were formed two blocks and Knez Milos Market, on west side the block where was madrassa was reduced and school building was set on the regulatory line and thereby was formed Sveti Sava

  18. Sampling and analysis plan for the 107-N Basin recirculation building liquid/sediment

    International Nuclear Information System (INIS)

    Thompson, W.S.

    1997-02-01

    This sampling and analysis plan (SAP) defines the strategy and the field and laboratory methods that will be used to characterize the liquids and sediment within the following four 100-N buildings/areas: 1310-N valve pit area inside the Radioactive Chemical Waste Treatment Pump House (silo); 1314-N Waste Pump (Overflow) Tank at the Liquid Waste Disposal Station; 105-N Lift Station pump well and valve pit areas inside the 105-N Reactor Building; and 107-N Basin Recirculation Building. This characterization activity is being performed in support of the work scope identified in the N Reactor Deactivation Program Plan and the sampling strategy in the DQO. The characterization data will be used for comparison to decontamination and decommissioning (D and D) endpoint acceptance criteria in preparation for turnover of the above-listed facilities to the D and D project. The data will also be used for waste acceptance criteria evaluation in the selection of the appropriate disposition option for liquid and sediment currently contained in the facilities

  19. Seismic proof test of shielding block walls

    International Nuclear Information System (INIS)

    Ohte, Yukio; Watanabe, Takahide; Watanabe, Hiroyuki; Maruyama, Kazuhide

    1989-01-01

    Most of the shielding block walls used for building nuclear facilities are built by dry process. When a nuclear facility is designed, seismic waves specific at each site are set as input seismic motions and they are adopted in the design. Therefore, it is necessary to assure safety of the shielding block walls for earthquake by performing anti-seismic experiments under the conditions at each site. In order to establish the normal form that can be applied to various seismic conditions in various areas, Shimizu Corp. made an actual-size test samples for the shielding block wall and confirmed the safety for earthquake and validity of normalization. (author)

  20. Experimental scheme and restoration algorithm of block compression sensing

    Science.gov (United States)

    Zhang, Linxia; Zhou, Qun; Ke, Jun

    2018-01-01

    Compressed Sensing (CS) can use the sparseness of a target to obtain its image with much less data than that defined by the Nyquist sampling theorem. In this paper, we study the hardware implementation of a block compression sensing system and its reconstruction algorithms. Different block sizes are used. Two algorithms, the orthogonal matching algorithm (OMP) and the full variation minimum algorithm (TV) are used to obtain good reconstructions. The influence of block size on reconstruction is also discussed.

  1. Seeps and springs sampling and analysis plan for the environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and operated by Martin Marietta Energy Systems, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources.

  2. Seeps and springs sampling and analysis plan for the environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-08-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and operated by Martin Marietta Energy Systems, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources

  3. Groundwater Quality Sampling and Analysis Plan for Environmental Monitoring Waste Area Grouping 6 at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-09-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling

  4. Forward planning

    International Nuclear Information System (INIS)

    Fontenla, D.P.

    2008-01-01

    By definition, forward planning is a process where input consists of conditions on beam configurations and parameters and output consists of dose distributions on target and critical structures, in contrast to inverse planning, where the opposite is true. For forward planning IMRT, criteria are as follows: (i) Plans created as an extension of standard 3D conformational planning; (ii) No significant increase in the complexity of the treatment planning or treatment delivery process; (3) Treatment verification using standard QA procedures; and process consists of the following steps: (i) Create a standard 3D conformational treatment plan; (ii) Copy one of the existing beams; (iii) Create control points: design new beam segments, blocking high dose areas; (iv) Repeat for all beams; (v) Re-compute dose; and (vi) Adjust control points weights to achieve desired dose distribution. A detailed exposition, with many clinical examples, is given for the breast, lung, and brain (P.A.)

  5. Comparison of three cell block techniques for detection of low frequency abnormal cells

    Directory of Open Access Journals (Sweden)

    McCormack M

    2013-01-01

    Full Text Available Steven A Hecht, Matthew McCormackHologic Inc, Marlborough, MA, USABackground: The Cellient® Automated Cell Block System rapidly creates paraffin-embedded cell blocks by using vacuum filtration to deposit a layer of cells on a filter and infiltrate those cells with reagents and paraffin. This study used a “tracer” cell model to mimic low frequency abnormal cells and compare detection and representative sampling with simple sedimentation, Richard-Allan HistoGel™, and Cellient cell block techniques.Methods: Tracer cells were a cultured cell line (CaSki fixed in methanol, prestained in solution with hematoxylin, and quantified using a hemacytometer. Tracer cells were diluted in a 10-fold dilution series ranging from 100 to 0.1 tracer/mL in a background of pooled clinical serous effusion specimens. Ten replicates of each dilution were processed using each cell block method, and the resulting blocks were cut to produce two slides from each block. The slides were deparaffinized, counterstained with eosin, cover-slipped, and screened for the presence of tracer cells. Blocks were considered to be representative of the specimen if tracer cells were detected on either of the slides. If no tracer cells were observed on either slide, the block was recut to generate a third slide. If tracer cells were seen on the third slide, the block was considered representative of the specimen.Results: Tracer cells were identified on the initial slides for 20 of 40 (50.0% simple sedimentation, 21 of 40 (52.5% of HistoGel, and 25 of 40 (62.5% of Cellient cell blocks. Representative sampling of the 1 tracer/mL specimen was 10.0% for simple sedimentation and 30.0% for HistoGel and Cellient. Only Cellient showed representative sampling of the 0.1 tracer/mL specimen.Conclusion: The Cellient System blocks demonstrated representative sampling at the lowest tracer cell concentration compared with simple sedimentation and HistoGel.Keywords: Cellient®, HistoGel™, simple

  6. Ultrasound-guided transversus abdominis plane block in combination with ilioinguinal-iliohypogastric block in a high risk cardiac patient for inguinal hernia repair: a case report

    OpenAIRE

    BARISIN, STJEPAN; DUZEL, VIKTOR; SAKIC, LIVIJA

    2015-01-01

    Background and Purpose: A high risk cardiac patient, ASA IV, was planned for inguinal hernia repair. Since general anaesthesia presented a high risk, anaesthesia was conducted with a transversus abdominis plane (TAP) in combination with ilioinguinal-iliohypogastric (ILIH) block. Material and Methods: A 70-year old male patient with severe CAD and previous LAD PTCA, AVR, in situ PPM and severe MR and TR 3+, was planned for elective inguinal hernia repair. The preoperative ECH...

  7. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  8. Addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation

    International Nuclear Information System (INIS)

    1994-03-01

    This document is an addendum to the Phase 2 Sampling and Analysis Plan for the Clinch River Remedial Investigation (DOE 1993). The Department of Energy--Oak Ridge Operations (DOE-ORO) is proposing this addendum to the US Envianmental Protection Agency, Region IV (EPA-IV), and the Tennessee Department of Environment and Conservation (TDEC) as a reduced sampling program on the Clinch River arm of Watts Bar Reservoir and on Poplar Creek. DOE-ORO is proposing to maximize the use of existing data and minimize the collection of new data for water, sediment, and biota during Phase 2 of the Clinch River Remedial Investigation. The existing data along with the additional data collected in Phase 2 would be used to perform a baseline risk assessment and make remedial decisions. DOE-ORO considers that the existing data, the additional data collected in Phase 2, and on-site remedial investigation data would be sufficient to understand the nature and extent of the contamination problem in the Clinch River, perform a baseline risk assessment,and make remedial decisions. This addendum is organized in three sections. The first section provides background information and describes a rationale for modifying the Phase 2 Sampling and Analysis Plan. Section 2 presents a summary of the existing data for the Clinch River arm of Watts Bar Reservoir and an evaluation of the sufficiency of this data for a baseline human health and ecological risk assessment. Section 3 describes the revised Phase 2 Sampling and Analysis Plan for surface water, sediment, and biota in the Clinch River OU and in the Poplar Creek OU

  9. Cutaneous Sensory Block Area, Muscle-Relaxing Effect, and Block Duration of the Transversus Abdominis Plane Block

    DEFF Research Database (Denmark)

    Støving, Kion; Rothe, Christian; Rosenstock, Charlotte V

    2015-01-01

    BACKGROUND AND OBJECTIVES: The transversus abdominis plane (TAP) block is a widely used nerve block. However, basic block characteristics are poorly described. The purpose of this study was to assess the cutaneous sensory block area, muscle-relaxing effect, and block duration. METHODS: Sixteen...... healthy volunteers were randomized to receive an ultrasound-guided unilateral TAP block with 20 mL 7.5 mg/mL ropivacaine and placebo on the contralateral side. Measurements were performed at baseline and 90 minutes after performing the block. Cutaneous sensory block area was mapped and separated...... into a medial and lateral part by a vertical line through the anterior superior iliac spine. We measured muscle thickness of the 3 lateral abdominal muscle layers with ultrasound in the relaxed state and during maximal voluntary muscle contraction. The volunteers reported the duration of the sensory block...

  10. Health and safety plan for characterization sampling of ETR and MTR facilities

    International Nuclear Information System (INIS)

    Baxter, D.E.

    1994-10-01

    This health and safety plan establishes the procedures and requirements that will be used to minimize health and safety risks to persons performing Engineering Test Reactor and Materials Test Reactor characterization sampling activities, as required by the Occupational Safety and Health Administration standard, 29 CFR 1910.120. It contains information about the hazards involved in performing the tasks, and the specific actions and equipment that will be used to protect persons working at the site

  11. Sampling and analysis plan for sludge located in fuel storage canisters of the 105-K West basin

    International Nuclear Information System (INIS)

    Baker, R.B.

    1997-01-01

    This Sampling and Analysis Plan (SAP) provides direction for the first sampling of sludge from the K West Basin spent fuel canisters. The specially developed sampling equipment removes representative samples of sludge while maintaining the radioactive sample underwater in the basin pool (equipment is described in WHC-SD-SNF-SDD-004). Included are the basic background logic for sample selection, the overall laboratory analyses required and the laboratory reporting required. These are based on requirements put forth in the data quality objectives (WHC-SD-SNF-DQO-012) established for this sampling and characterization activity

  12. Conditioned blocking is re-established by neurotransplantation in mature rats

    Czech Academy of Sciences Publication Activity Database

    Morón, I.; Ballesteros, M. A.; Valoušková, Věra; Gallo, M.

    2001-01-01

    Roč. 12, č. 11 (2001), s. 2297-2301 ISSN 0959-4965 R&D Projects: GA MZd NF5400 Institutional research plan: CEZ:AV0Z5011922 Keywords : aging * conditioned blocking * neurotransplantation Subject RIV: FH - Neurology Impact factor: 2.374, year: 2001

  13. Salt Block II: description and results

    International Nuclear Information System (INIS)

    Hohlfelder, J.J.

    1980-06-01

    A description of and results from the Salt Block II experiment, which involved the heating of and measurement of water transport within a large sample of rock salt, are presented. These results include the measurement of water released into a heated borehole in the sample as well as measured temperatures within the salt. Measured temperatures are compared with the results of a mathematical model of the experiment

  14. 47 CFR 101.1405 - Channeling plan.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Channeling plan. 101.1405 Section 101.1405 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... Channeling plan. Each license shall have one spectrum block of 500 megahertz per geographic area that can be...

  15. 31 CFR 594.301 - Blocked account; blocked property.

    Science.gov (United States)

    2010-07-01

    ... (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY GLOBAL TERRORISM SANCTIONS REGULATIONS General Definitions § 594.301 Blocked account; blocked property. The terms blocked account and...

  16. 40 CFR Appendix X to Part 86 - Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks Table 1—Sampling...

  17. Orthodontic tooth movement of total buccally blocked-out canine: a case report

    OpenAIRE

    Alkhal, Hessa M; Rabie, Bakr; Wong, Ricky W K

    2009-01-01

    Orthodontic tooth movement of total buccally blocked-out canine is usually difficult as it is related with the problems of severe crowding, midline deviation, involvement of long root movement and risk of gingival recession. A case report was presented to illustrate the treatment principles. It demonstrated with careful planning in extraction sequence and orthodontic mechanics to deliver light, controlled force, condition of totally blocked out canine could be corrected with good results.

  18. Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. L. (Environmental Science Division)

    2011-06-30

    The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

  19. Arterial and venous plasma levels of bupivacaine following peripheral nerve blocks.

    Science.gov (United States)

    Moore, D C; Mather, L E; Bridenbaugh, L D; Balfour, R I; Lysons, D F; Horton, W G

    1976-01-01

    Mean arterial plasma (MAP) and peripheral mean venous plasma (MVP) levels of bupivacaine were ascertained in 3 groups of 10 patients each for: (1) intercostal nerve block, 400 mg; (2) block of the sciatic, femoral, and lateral femoral cutaneous nerves, with or without block of the obturator nerve, 400 mg; and (3) supraclavicular brachial plexus block, 300 mg. MAP levels were consistently higher than simultaneously sampled MVP levels, the highest levels occurring from bilateral intercostal nerve block. No evidence of systemic toxicity was observed. The results suggest that bupivacaine has a much wider margin of safety in humans than is now stated.

  20. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices

  1. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  2. ["Habitual" left branch block alternating with 2 "disguised" bracnch block].

    Science.gov (United States)

    Lévy, S; Jullien, G; Mathieu, P; Mostefa, S; Gérard, R

    1976-10-01

    Two cases of alternating left bundle branch block and "masquerading block" (with left bundle branch morphology in the stnadard leads and right bundle branch block morphology in the precordial leads) were studied by serial tracings and his bundle electrocardiography. In case 1 "the masquerading" block was associated with a first degree AV block related to a prolongation of HV interval. This case is to our knowledge the first cas of alternating bundle branch block in which his bundle activity was recorded in man. In case 2, the patient had atrial fibrilation and His bundle recordings were performed while differents degrees of left bundle branch block were present: The mechanism of the alternation and the concept of "masquerading" block are discussed. It is suggested that this type of block represents a right bundle branch block associated with severe lesions of the "left system".

  3. Groundwater quality sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of energy and managed by martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

  4. Groundwater quality sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-03-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of energy and managed by martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling

  5. Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System

  6. A SWOT analysis of Planning Support Systems

    NARCIS (Netherlands)

    Vonk, G.; Geertman, S.; Schot, P.P.

    2007-01-01

    Insight into the strengths, weaknesses, opportunities, and threats (SWOT) of planning support systems (PSS) is fragmented between users and system developers. The lack of combined insights blocks development in the right direction and makes potential users hesitant to apply PSS in planning. This

  7. A novel derivation of a within-batch sampling plan based on a Poisson-gamma model characterising low microbial counts in foods.

    Science.gov (United States)

    Gonzales-Barron, Ursula; Zwietering, Marcel H; Butler, Francis

    2013-02-01

    This study proposes a novel step-wise methodology for the derivation of a sampling plan by variables for food production systems characterised by relatively low concentrations of the inspected microorganism. After representing the universe of contaminated batches by modelling the between-batch and within-batch variability in microbial counts, a tolerance criterion defining batch acceptability (i.e., up to a tolerance percentage of the food units having microbial concentrations lower or equal to a critical concentration) is established to delineate a limiting quality contour that separates satisfactory from unsatisfactory batches. The problem consists then of finding the optimum decision criterion - arithmetic mean of the analytical results (microbiological limit, m(L)) and the sample size (n) - that satisfies a pre-defined level of confidence measured on the samples' mean distributions from all possible true within-batch distributions. This is approached by obtaining decision landscape curves representing collectively the conditional and joint producer's and consumer's risks at different microbiological limits along with confidence intervals representing uncertainty due to the propagated between-batch variability. Whilst the method requires a number of risk management decisions to be made such as the objective of the sampling plan (GMP-based or risk-based), the modality of derivation, the tolerance criterion or level of safety, and the statistical level of confidence, the proposed method can be used when past monitoring data are available so as to produce statistically-sound dynamic sampling plans with optimised efficiency and discriminatory power. For the illustration of Enterobacteriaceae concentrations on Irish sheep carcasses, a sampling regime of n=10 and m(L)=17.5CFU/cm(2) is recommended to ensure that the producer has at least a 90% confidence of accepting a satisfactory batch whilst the consumer at least a 97.5% confidence that a batch will not be

  8. A Fixed-Precision Sequential Sampling Plan for the Potato Tuberworm Moth, Phthorimaea operculella Zeller (Lepidoptera: Gelechidae), on Potato Cultivars.

    Science.gov (United States)

    Shahbi, M; Rajabpour, A

    2017-08-01

    Phthorimaea operculella Zeller is an important pest of potato in Iran. Spatial distribution and fixed-precision sequential sampling for population estimation of the pest on two potato cultivars, Arinda ® and Sante ® , were studied in two separate potato fields during two growing seasons (2013-2014 and 2014-2015). Spatial distribution was investigated by Taylor's power law and Iwao's patchiness. Results showed that the spatial distribution of eggs and larvae was random. In contrast to Iwao's patchiness, Taylor's power law provided a highly significant relationship between variance and mean density. Therefore, fixed-precision sequential sampling plan was developed by Green's model at two precision levels of 0.25 and 0.1. The optimum sample size on Arinda ® and Sante ® cultivars at precision level of 0.25 ranged from 151 to 813 and 149 to 802 leaves, respectively. At 0.1 precision level, the sample sizes varied from 5083 to 1054 and 5100 to 1050 leaves for Arinda ® and Sante ® cultivars, respectively. Therefore, the optimum sample sizes for the cultivars, with different resistance levels, were not significantly different. According to the calculated stop lines, the sampling must be continued until cumulative number of eggs + larvae reached to 15-16 or 96-101 individuals at precision levels of 0.25 or 0.1, respectively. The performance of the sampling plan was validated by resampling analysis using resampling for validation of sampling plans software. The sampling plant provided in this study can be used to obtain a rapid estimate of the pest density with minimal effort.

  9. 40 CFR Appendix A to Subpart G of... - Sampling Plans for Selective Enforcement Auditing of Marine Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Marine Engines A Appendix A to Subpart G of Part 91 Protection of Environment...-IGNITION ENGINES Selective Enforcement Auditing Regulations Pt. 91, Subpt. G, App. A Appendix A to Subpart G of Part 91—Sampling Plans for Selective Enforcement Auditing of Marine Engines Table 1—Sampling...

  10. Re-Planning for Compensator-Based IMRT with Original Compensators

    International Nuclear Information System (INIS)

    Zhang, Geoffrey; Feygelman, Vladimir; Stevens, Craig; Li Weiqi; Leuthold, Susan; Springett, Gregory; Hoffe, Sarah

    2011-01-01

    Compared with multileaf collimator (MLC)-based intensity-modulated radiotherapy (IMRT) for moving targets, compensator-based IMRT has advantages such as shorter beam-on time, fewer monitor units with potentially decreased secondary carcinogenesis risk, better optimization-to-deliverable dose conversion, and often better dose conformity. Some of the disadvantages include additional time for the compensators to be built and delivered, as well as extra cost. Patients undergoing treatment of abdominal cancers often experience weight loss. It would be necessary to account for this change in weight with a new plan and a second set of compensators. However, this would result in treatment delays and added costs. We have developed a method to re-plan the patient using the same set of compensators. Because the weight changes seen with the treatment of abdominal cancers are usually relatively small, a new 4D computed tomography (CT) acquired in the treatment position with markers on the original isocenter tattoos can be registered to the original planning scan. The contours of target volumes from the original scans are copied to the new scan after fusion. The original compensator set can be used together with a few field-in-field (FiF) beams defined by the MLC (or beams with cerrobend blocks for accelerators not equipped with a MLC). The weights of the beams with compensators are reduced so that the FiF or blocked beams can be optimized to mirror the original plan and dose distribution. Seven abdominal cancer cases are presented using this technique. The new plan on the new planning CT images usually has the same dosimetric quality as the original. The target coverage and dose uniformity are improved compared with the plan without FiF/block modification. Techniques combining additional FiF or blocked beams with the original compensators optimize the treatment plans when patients lose weight and save time and cost compared with generating plans with a new set of compensators.

  11. E-Block: A Tangible Programming Tool with Graphical Blocks

    Directory of Open Access Journals (Sweden)

    Danli Wang

    2013-01-01

    Full Text Available This paper designs a tangible programming tool, E-Block, for children aged 5 to 9 to experience the preliminary understanding of programming by building blocks. With embedded artificial intelligence, the tool defines the programming blocks with the sensors as the input and enables children to write programs to complete the tasks in the computer. The symbol on the programming block's surface is used to help children understanding the function of each block. The sequence information is transferred to computer by microcomputers and then translated into semantic information. The system applies wireless and infrared technologies and provides user with feedbacks on both screen and programming blocks. Preliminary user studies using observation and user interview methods are shown for E-Block's prototype. The test results prove that E-Block is attractive to children and easy to learn and use. The project also highlights potential advantages of using single chip microcomputer (SCM technology to develop tangible programming tools for children.

  12. Supplement to the UMTRA project water sampling and analysis plan, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1995-09-01

    The water sampling and analysis plan (WSAP) provides the regulatory and technical basis for ground water and surface water sampling at the Uranium Mill Tailings Remedial Action (UMTRA) Project Union Carbide (UC) and North Continent (NC) processing sites and the Burro Canyon disposal site near Slick Rock, Colorado. The initial WSAP was finalized in August 1994 and will be completely revised in accordance with the WSAP guidance document (DOE, 1995) in late 1996. This version supplements the initial WSAP, reflects only minor changes in sampling that occurred in 1995, covers sampling scheduled for early 1996, and provides a preliminary projection of the next 5 years of sampling and monitoring activities. Once surface remedial action is completed at the former processing sites, additional and more detailed hydrogeologic characterization may be needed to develop the Ground Water Program conceptual ground water model and proposed compliance strategy. In addition, background ground water quality needs to be clearly defined to ensure that the baseline risk assessment accurately estimated risks from the contaminants of potential concern in contaminated ground water at the UC and NC sites

  13. UMTRA project water sampling and analysis plan, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1994-04-01

    The Mexican Hat, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project site is a former uranium mill that is undergoing surface remediation in the form of on-site tailings stabilization. Contaminated surface materials from the Monument Valley, Arizona, UMTRA Project site have been transported to the Mexican Hat site and are being consolidated with the Mexican Hat tailings. The scheduled completion of the tailings disposal cell is August 1995. Water is found in two geologic units at the site: the Halgaito Shale Formation and the Honaker Trail Formation. The tailings rest on the Halgaito Shale, and water contained in that unit is a result of milling activities and, to a lesser extent, water released from the tailings from compaction during remedial action construction of the disposal cell. Water in the Halgaito Shale flows through fractures and discharges at seeps along nearby arroyos. Flow from the seeps will diminish as water drains from the unit. Ground water in the lower unit, the Honaker Trail Formation, is protected from contamination by an upward hydraulic gradient. There are no nearby water supply wells because of widespread poor background ground water quality and quantity, and the San Juan River shows no impacts from the site. This water sampling and analysis plan (WSAP) recommends sampling six seeps and one upgradient monitor well compared in the Honaker Trail Formation. Samples will be taken in April 1994 (representative of high group water levels) and September 1994 (representative of low ground water levels). Analyses will be performed on filtered samples for plume indicator parameters

  14. Pectoral nerves (PECS) and intercostal nerve block for cardiac resynchronization therapy device implantation.

    Science.gov (United States)

    Fujiwara, Atsushi; Komasawa, Nobuyasu; Minami, Toshiaki

    2014-01-01

    A 71-year-old man was scheduled to undergo cardiac resynchronization therapy device (CRTD) implantation. He was combined with severe chronic heart failure due to ischemic heart disease. NYHA class was 3 to 4 and electrocardiogram showed non-sustained ventricular. Ejection fraction was about 20% revealed by transthoracic echocardiogram. He was also on several anticoagulation medications. We planned to implant the device under the greater pectoral muscle. As general anesthesia was considered risky, monitored anesthesia care utilizing peripheral nerve block and slight sedation was scheduled. Pectoral nerves (PECS) block and intercostal block was performed under ultrasonography with ropivacaine. For sedation during the procedure, continuous infusion of dexmedetomidine without a loading dose was performed. The procedure lasted about 3 hours, but the patient showed no pain or restlessness. Combination of PECS block and intercostal block may provide effective analgesia for CRTD implantation.

  15. E-Block: A Tangible Programming Tool with Graphical Blocks

    OpenAIRE

    Danli Wang; Yang Zhang; Shengyong Chen

    2013-01-01

    This paper designs a tangible programming tool, E-Block, for children aged 5 to 9 to experience the preliminary understanding of programming by building blocks. With embedded artificial intelligence, the tool defines the programming blocks with the sensors as the input and enables children to write programs to complete the tasks in the computer. The symbol on the programming block's surface is used to help children understanding the function of each block. The sequence information is transfer...

  16. Sample size planning for composite reliability coefficients: accuracy in parameter estimation via narrow confidence intervals.

    Science.gov (United States)

    Terry, Leann; Kelley, Ken

    2012-11-01

    Composite measures play an important role in psychology and related disciplines. Composite measures almost always have error. Correspondingly, it is important to understand the reliability of the scores from any particular composite measure. However, the point estimates of the reliability of composite measures are fallible and thus all such point estimates should be accompanied by a confidence interval. When confidence intervals are wide, there is much uncertainty in the population value of the reliability coefficient. Given the importance of reporting confidence intervals for estimates of reliability, coupled with the undesirability of wide confidence intervals, we develop methods that allow researchers to plan sample size in order to obtain narrow confidence intervals for population reliability coefficients. We first discuss composite reliability coefficients and then provide a discussion on confidence interval formation for the corresponding population value. Using the accuracy in parameter estimation approach, we develop two methods to obtain accurate estimates of reliability by planning sample size. The first method provides a way to plan sample size so that the expected confidence interval width for the population reliability coefficient is sufficiently narrow. The second method ensures that the confidence interval width will be sufficiently narrow with some desired degree of assurance (e.g., 99% assurance that the 95% confidence interval for the population reliability coefficient will be less than W units wide). The effectiveness of our methods was verified with Monte Carlo simulation studies. We demonstrate how to easily implement the methods with easy-to-use and freely available software. ©2011 The British Psychological Society.

  17. Sampling and analysis plan for remediation of Operable Unit 100-IU-3 waste site 600-104

    International Nuclear Information System (INIS)

    1997-08-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities to support remediation of 100-IU-3 Operable Unit waste site 600-104. The purpose of the proposed sampling and analysis activities is to demonstrate that time-critical remediation of the waste site for soil containing 2,4-Dichlorophonoxyacetic acid salts and esters (2,4-D) and dioxin/furan isomers at concentrations that exceed cleanup levels has been effective. This shall be accomplished by sampling various locations of the waste site before and after remediation, analyzing the samples, and comparing the results to action levels set by the Washington State Department of Ecology

  18. Current status of preparing buffer/backfill block in HLW disposal abroad

    International Nuclear Information System (INIS)

    Yan Ming; Wang Xuewen; Zhang Huyuan

    2014-01-01

    There is an urgent need for China to commence the full-scale compaction test, resolving the preparation problem for buffer/backfill blocks when underground research laboratory project is planned for High Level Radioactive Waste (HLW) disposal. The foreign countries have some research about the preparation of buffer/backfill blocks in engineered barrier systems. The foreign research shows that installation of clay blocks with sector shape at waste pollution area is a feasible engineering method. Compacted clay blocks need to be cured in a cabinet with controlled temperature and humidity to avoid desiccation and surface powdering. A freeze mixing method, mixing powdered-ice and cooled bentonite, can be operated more easily and obtain more uniform hydration than the traditional mixing of water and bentonite. It is helpful to review and adsorb the foreign research results for the design of full-scale test of bentonite compaction. (authors)

  19. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Nonroad Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Nonroad Engines A Appendix A to Subpart F of Part 89 Protection of Environment... NONROAD COMPRESSION-IGNITION ENGINES Selective Enforcement Auditing Pt. 89, Subpt. F, App. A Appendix A to Subpart F of Part 89—Sampling Plans for Selective Enforcement Auditing of Nonroad Engines Table 1—Sampling...

  20. Tertiary block rotations in the Fars Arc (Zagros, Iran)

    Science.gov (United States)

    Aubourg, C.; Smith, B.; Bakhtari, H. R.; Guya, N.; Eshraghi, A.

    2008-05-01

    The Fars arc accommodates the oblique convergence between the Arabic plate and the Iran block. Many geological observations suggest block rotations from regional to local scales. We present palaeomagnetic investigations in the Fars arc and its eastern termination, the Zagros-Makran syntaxis. Sixty-four sites have been sampled covering the Palaeocene Pabdeh Fm. to Mio-Pliocene Agha-Jhari Fm., the latest being the most sampled formation. We document pre-tilting components in all formations. However, coarse fractions of Agha-Jhari clastics formation retain a post-tilting remagnetization. As a whole, block rotations rarely exceed 20°. In the western Fars arc, clockwise and counter-clockwise rotations of small amplitudes are consistent with the torsions observed near the strike slip Kazerun and Mangarak faults. In the Zagros Makran syntaxis, counter-clockwise and clockwise rotations are observed, respectively, in the western and eastern part. This pattern is consistent with an amplification of the shape of the syntaxis. Between Zagros and Makran, palaeomagnetic data support that the present-day arcuate shape of the arc is secondary. We assume that most of the block rotations took place during the Plio-Pleistocene, during a blocking stage of the Zagros-Makran syntaxis. We emphasize the role of Oman Peninsula which plays as an indenter for the propagation of the Fars thrust belt.

  1. Combined Psoas Compartment-Sciatic Block in a Pediatric Patient with High-Risk Cardiopulmonary

    OpenAIRE

    Levent Þahin

    2013-01-01

    There is high potential for complications in cardiopulmonary high-risk patients with valvular heart disease at perioperative period. The operation was planned due to pathological fracture of the femoral shaft of a nine year old male patient weighing 26 kilograms. He had 3o tricuspid insufficiency, 3o mitral insufficiency and pulmonary hypertension in preoperative evaluation. Sciatic nerve block and psoas compartment block was performed to patient for anesthesia and analgesia. In conclusion we...

  2. A large block heater test for high level nuclear waste management

    International Nuclear Information System (INIS)

    Lin, W.; Wilder, D.G.; Blink, J.A.

    1994-07-01

    The radioactive decay heat from nuclear waste packages may, depending on the thermal load, create coupled thermal-mechanical-hydrological-chemical (TMHC) processes in the near-field environment of a repository. A group of tests on a large block (LBT) are planned to provide a timely opportunity to test and calibrate some of the TMHC model concepts. The LBT is advantageous for testing and verifying model concepts because the boundary conditions are controlled, and the block can be characterized before and after the experiment. A block of Topopah Spring tuff of about 3 x 3 x 4.5 m will be sawed and isolated at Fran Ridge, Nevada Test Site. Small blocks of the rock adjacent to the large block will be collected for laboratory testing of some individual thermal-mechanical hydrological and chemical processes. A constant load of about 4 MPa will be applied to the top and sides of the large block. The sides will be sealed with moisture and thermal barriers. The large block will be heated by heaters within and guard heaters on the sides so that a dry-out zone and a condensate zone will exist simultaneously. Temperature, moisture content, pore pressure, chemical composition, stress, and displacement will be throughout the block during the heating and cool-down phases. The results from the experiments on small blocks and the tests on the large block will provide a better understanding of some concepts of the coupled TMHC processes. The progress of the project is presented in this paper

  3. Efficacy of Exclusive Lingual Nerve Block versus Conventional Inferior Alveolar Nerve Block in Achieving Lingual Soft-tissue Anesthesia.

    Science.gov (United States)

    Balasubramanian, Sasikala; Paneerselvam, Elavenil; Guruprasad, T; Pathumai, M; Abraham, Simin; Krishnakumar Raja, V B

    2017-01-01

    The aim of this randomized clinical trial was to assess the efficacy of exclusive lingual nerve block (LNB) in achieving selective lingual soft-tissue anesthesia in comparison with conventional inferior alveolar nerve block (IANB). A total of 200 patients indicated for the extraction of lower premolars were recruited for the study. The samples were allocated by randomization into control and study groups. Lingual soft-tissue anesthesia was achieved by IANB and exclusive LNB in the control and study group, respectively. The primary outcome variable studied was anesthesia of ipsilateral lingual mucoperiosteum, floor of mouth and tongue. The secondary variables assessed were (1) taste sensation immediately following administration of local anesthesia and (2) mouth opening and lingual nerve paresthesia on the first postoperative day. Data analysis for descriptive and inferential statistics was performed using SPSS (IBM SPSS Statistics for Windows, Version 22.0, Armonk, NY: IBM Corp. Released 2013) and a P nerve block in achieving selective anesthesia of lingual soft tissues. It is technically simple and associated with minimal complications as compared to IAN block.

  4. Laboratory Guide for Residual Stress Sample Alignment and Experiment Planning-October 2011 Version

    Energy Technology Data Exchange (ETDEWEB)

    Cornwell, Paris A [ORNL; Bunn, Jeffrey R [ORNL; Schmidlin, Joshua E [ORNL; Hubbard, Camden R [ORNL

    2012-04-01

    The December 2010 version of the guide, ORNL/TM-2008/159, by Jeff Bunn, Josh Schmidlin, Camden Hubbard, and Paris Cornwell, has been further revised due to a major change in the GeoMagic Studio software for constructing a surface model. The Studio software update also includes a plug-in module to operate the FARO Scan Arm. Other revisions for clarity were also made. The purpose of this revision document is to guide the reader through the process of laser alignment used by NRSF2 at HFIR and VULCAN at SNS. This system was created to increase the spatial accuracy of the measurement points in a sample, reduce the use of neutron time used for alignment, improve experiment planning, and reduce operator error. The need for spatial resolution has been driven by the reduction in gauge volumes to the sub-millimeter level, steep strain gradients in some samples, and requests to mount multiple samples within a few days for relating data from each sample to a common sample coordinate system. The first step in this process involves mounting the sample on an indexer table in a laboratory set up for offline sample mounting and alignment in the same manner it would be mounted at either instrument. In the shared laboratory, a FARO ScanArm is used to measure the coordinates of points on the sample surface ('point cloud'), specific features and fiducial points. A Sample Coordinate System (SCS) needs to be established first. This is an advantage of the technique because the SCS can be defined in such a way to facilitate simple definition of measurement points within the sample. Next, samples are typically mounted to a frame of 80/20 and fiducial points are attached to the sample or frame then measured in the established sample coordinate system. The laser scan probe on the ScanArm can then be used to scan in an 'as-is' model of the sample as well as mounting hardware. GeoMagic Studio 12 is the software package used to construct the model from the point cloud the

  5. Laboratory Guide for Residual Stress Sample Alignment and Experiment Planning-October 2011 Version

    International Nuclear Information System (INIS)

    Cornwell, Paris A.; Bunn, Jeffrey R.; Schmidlin, Joshua E.; Hubbard, Camden R.

    2012-01-01

    The December 2010 version of the guide, ORNL/TM-2008/159, by Jeff Bunn, Josh Schmidlin, Camden Hubbard, and Paris Cornwell, has been further revised due to a major change in the GeoMagic Studio software for constructing a surface model. The Studio software update also includes a plug-in module to operate the FARO Scan Arm. Other revisions for clarity were also made. The purpose of this revision document is to guide the reader through the process of laser alignment used by NRSF2 at HFIR and VULCAN at SNS. This system was created to increase the spatial accuracy of the measurement points in a sample, reduce the use of neutron time used for alignment, improve experiment planning, and reduce operator error. The need for spatial resolution has been driven by the reduction in gauge volumes to the sub-millimeter level, steep strain gradients in some samples, and requests to mount multiple samples within a few days for relating data from each sample to a common sample coordinate system. The first step in this process involves mounting the sample on an indexer table in a laboratory set up for offline sample mounting and alignment in the same manner it would be mounted at either instrument. In the shared laboratory, a FARO ScanArm is used to measure the coordinates of points on the sample surface ('point cloud'), specific features and fiducial points. A Sample Coordinate System (SCS) needs to be established first. This is an advantage of the technique because the SCS can be defined in such a way to facilitate simple definition of measurement points within the sample. Next, samples are typically mounted to a frame of 80/20 and fiducial points are attached to the sample or frame then measured in the established sample coordinate system. The laser scan probe on the ScanArm can then be used to scan in an 'as-is' model of the sample as well as mounting hardware. GeoMagic Studio 12 is the software package used to construct the model from the point cloud the scan arm creates. Once

  6. Spatial Distribution and Sampling Plans With Fixed Level of Precision for Citrus Aphids (Hom., Aphididae) on Two Orange Species.

    Science.gov (United States)

    Kafeshani, Farzaneh Alizadeh; Rajabpour, Ali; Aghajanzadeh, Sirous; Gholamian, Esmaeil; Farkhari, Mohammad

    2018-04-02

    Aphis spiraecola Patch, Aphis gossypii Glover, and Toxoptera aurantii Boyer de Fonscolombe are three important aphid pests of citrus orchards. In this study, spatial distributions of the aphids on two orange species, Satsuma mandarin and Thomson navel, were evaluated using Taylor's power law and Iwao's patchiness. In addition, a fixed-precision sequential sampling plant was developed for each species on the host plant by Green's model at precision levels of 0.25 and 0.1. The results revealed that spatial distribution parameters and therefore the sampling plan were significantly different according to aphid and host plant species. Taylor's power law provides a better fit for the data than Iwao's patchiness regression. Except T. aurantii on Thomson navel orange, spatial distribution patterns of the aphids were aggregative on both citrus. T. aurantii had regular dispersion pattern on Thomson navel orange. Optimum sample size of the aphids varied from 30-2061 and 1-1622 shoots on Satsuma mandarin and Thomson navel orange based on aphid species and desired precision level. Calculated stop lines of the aphid species on Satsuma mandarin and Thomson navel orange ranged from 0.48 to 19 and 0.19 to 80.4 aphids per 24 shoots according to aphid species and desired precision level. The performance of the sampling plan was validated by resampling analysis using resampling for validation of sampling plans (RVSP) software. This sampling program is useful for IPM program of the aphids in citrus orchards.

  7. Combined Psoas Compartment-Sciatic Block in a Pediatric Patient with High-Risk Cardiopulmonary

    Directory of Open Access Journals (Sweden)

    Levent Þahin

    2013-03-01

    Full Text Available There is high potential for complications in cardiopulmonary high-risk patients with valvular heart disease at perioperative period. The operation was planned due to pathological fracture of the femoral shaft of a nine year old male patient weighing 26 kilograms. He had 3o tricuspid insufficiency, 3o mitral insufficiency and pulmonary hypertension in preoperative evaluation. Sciatic nerve block and psoas compartment block was performed to patient for anesthesia and analgesia. In conclusion we think that combined psoas compartment-sciatic nerve block may be a good alternative to other methods of anesthesia in high-risk pediatric patients with cardiopulmonary perspective in lower-extremity surgery.

  8. The testing of thermal-mechanical-hydrological-chemical processes using a large block

    International Nuclear Information System (INIS)

    Lin, W.; Wilder, D.G.; Blink, J.A.; Blair, S.C.; Buscheck, T.A.; Chesnut, D.A.; Glassley, W.E.; Lee, K.; Roberts, J.J.

    1994-01-01

    The radioactive decay heat from nuclear waste packages may, depending on the thermal load, create coupled thermal-mechanical-hydrological-chemical (TMHC) processes in the near-field environment of a repository. A group of tests on a large block (LBT) are planned to provide a timely opportunity to test and calibrate some of the TMHC model concepts. The LBT is advantageous for testing and verifying model concepts because the boundary conditions are controlled, and the block can be characterized before and after the experiment. A block of Topopah Spring tuff of about 3 x 3 x 4.5 m will be sawed and isolated at Fran Ridge, Nevada Test Site. Small blocks of the rock adjacent to the large block will be collected for laboratory testing of some individual thermal-mechanical, hydrological, and chemical processes. A constant load of about 4 MPa will be applied to the top and sides of the large block. The sides will be sealed with moisture and thermal barriers. The large block will be heated with one heater in each borehole and guard heaters on the sides so that a dry-out zone and a condensate zone will exist simultaneously. Temperature, moisture content, pore pressure, chemical composition, stress and displacement will be measured throughout the block during the heating and cool-down phases. The results from the experiments on small blocks and the tests on the large block will provide a better understanding of some concepts of the coupled TMHC processes

  9. Determination of the influence of dispersion pattern of pesticide-resistant individuals on the reliability of resistance estimates using different sampling plans.

    Science.gov (United States)

    Shah, R; Worner, S P; Chapman, R B

    2012-10-01

    Pesticide resistance monitoring includes resistance detection and subsequent documentation/ measurement. Resistance detection would require at least one (≥1) resistant individual(s) to be present in a sample to initiate management strategies. Resistance documentation, on the other hand, would attempt to get an estimate of the entire population (≥90%) of the resistant individuals. A computer simulation model was used to compare the efficiency of simple random and systematic sampling plans to detect resistant individuals and to document their frequencies when the resistant individuals were randomly or patchily distributed. A patchy dispersion pattern of resistant individuals influenced the sampling efficiency of systematic sampling plans while the efficiency of random sampling was independent of such patchiness. When resistant individuals were randomly distributed, sample sizes required to detect at least one resistant individual (resistance detection) with a probability of 0.95 were 300 (1%) and 50 (10% and 20%); whereas, when resistant individuals were patchily distributed, using systematic sampling, sample sizes required for such detection were 6000 (1%), 600 (10%) and 300 (20%). Sample sizes of 900 and 400 would be required to detect ≥90% of resistant individuals (resistance documentation) with a probability of 0.95 when resistant individuals were randomly dispersed and present at a frequency of 10% and 20%, respectively; whereas, when resistant individuals were patchily distributed, using systematic sampling, a sample size of 3000 and 1500, respectively, was necessary. Small sample sizes either underestimated or overestimated the resistance frequency. A simple random sampling plan is, therefore, recommended for insecticide resistance detection and subsequent documentation.

  10. 300-FF-1 remedial action sampling and analysis plan DQO process summary report

    International Nuclear Information System (INIS)

    Carlson, R.A.

    1997-01-01

    The scope of the 300-FF-1 Operable Unit (OU) data quality objective (DQO) process includes the soil and debris from the waste sites identified in the Proposed Plan for the 300-FF-1 and 300-FF-5 Operable units and, as the DQO process evolved, refined by the 300-FF-1 Record of Decision (ROD). Exclusions are identified in Section 1.3. The 300-FF-1 waste sites are addressed throughout the DQO process as they were subdivided in the proposed plan. The waste sites are divided into areas or zones known to be above the cleanup standards, zones below the cleanup standards, and zones where the contamination level is currently unknown. The project objectives are (1) to identify the criteria by which 300-FF-1 contaminated soil and debris may be shipped to the Environmental Restoration Disposal Facility (ERDF), (2) to identify the criteria by which the 300-FF-1 waste sites can be demonstrated as meeting the cleanup criteria, and (3) to develop a sampling and analysis plan (SAP) that adequately allows the evaluation of soil and debris analysis against the criteria

  11. Guidance document for preparing water sampling and analysis plans for UMTRA Project sites. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    A water sampling and analysis plan (WSAP) is prepared for each Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide the rationale for routine ground water sampling at disposal sites and former processing sites. The WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine ground water monitoring stations at each site. This guidance document has been prepared by the Technical Assistance Contractor (TAC) for the US Department of Energy (DOE). Its purpose is to provide a consistent technical approach for sampling and monitoring activities performed under the WSAP and to provide a consistent format for the WSAP documents. It is designed for use by the TAC in preparing WSAPs and by the DOE, US Nuclear Regulatory Commission, state and tribal agencies, other regulatory agencies, and the public in evaluating the content of WSAPS

  12. Poly(ferrocenylsilane)-block-Polylactide Block Copolymers

    NARCIS (Netherlands)

    Roerdink, M.; van Zanten, Thomas S.; Hempenius, Mark A.; Zhong, Zhiyuan; Feijen, Jan; Vancso, Gyula J.

    2007-01-01

    A PFS/PLA block copolymer was studied to probe the effect of strong surface interactions on pattern formation in PFS block copolymer thin films. Successful synthesis of PFS-b-PLA was demonstrated. Thin films of these polymers show phase separation to form PFS microdomains in a PLA matrix, and

  13. Development of low thermal mass cement-sand block utilizing peat soil and effective microorganism

    Directory of Open Access Journals (Sweden)

    Irham Hameeda Mohamad Idris

    2018-06-01

    Full Text Available The development of low thermal mass cement-sand block by incorporating peat soil and Effective Microorganism (EM was studied systematically. In total, seven mixtures of cement-sand block targeted at a 28-days compressive strength of 7 MPa are designed. One control sample is made with a water/cement ratio (w/c of 0.5, three mixes using 3%, 6% and 10% peat soil replacing sand and three mixes using 10%, 20% and 30% EM replacing water. Modified blocks with 6% of peat soil and 30% of EM are the most optimum blocks to be used in the construction of masonry as they successfully reduced the thermal conductivity of the blocks with the value of 1.275 W/mK and 1.792 W/mK respectively when being compared to the thermal conductivity of the control sample which is 2.400 W/mK. Besides, they are also able to achieve higher strength than the desired compressive strength which is 7 MPa. The compressive strength of the samples with 6% of peat soil is 16.48 MPa at 28-days while 30.39 MPa for samples with 30% of EM. On the other hand, the water absorption rate of samples with 6% of peat soil is 7.6% while 6.1% for samples with 30% EM and both are okay since their rate of water absorption is lower than 20%. In conclusion, the addition of peat soil and EM in the cement-sand mix show promising performance as a low cost material to produce low thermal mass cement-sand block. Keywords: Effective microorganism, Peat soil, Thermal conductivity, Cement brick

  14. Field Sampling Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    International Nuclear Information System (INIS)

    Lewis, Michael George

    2016-01-01

    This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.

  15. Field Sampling Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Michael George [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-10-01

    This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.

  16. Specified assurance level sampling procedure

    International Nuclear Information System (INIS)

    Willner, O.

    1980-11-01

    In the nuclear industry design specifications for certain quality characteristics require that the final product be inspected by a sampling plan which can demonstrate product conformance to stated assurance levels. The Specified Assurance Level (SAL) Sampling Procedure has been developed to permit the direct selection of attribute sampling plans which can meet commonly used assurance levels. The SAL procedure contains sampling plans which yield the minimum sample size at stated assurance levels. The SAL procedure also provides sampling plans with acceptance numbers ranging from 0 to 10, thus, making available to the user a wide choice of plans all designed to comply with a stated assurance level

  17. Maximum type I error rate inflation from sample size reassessment when investigators are blind to treatment labels.

    Science.gov (United States)

    Żebrowska, Magdalena; Posch, Martin; Magirr, Dominic

    2016-05-30

    Consider a parallel group trial for the comparison of an experimental treatment to a control, where the second-stage sample size may depend on the blinded primary endpoint data as well as on additional blinded data from a secondary endpoint. For the setting of normally distributed endpoints, we demonstrate that this may lead to an inflation of the type I error rate if the null hypothesis holds for the primary but not the secondary endpoint. We derive upper bounds for the inflation of the type I error rate, both for trials that employ random allocation and for those that use block randomization. We illustrate the worst-case sample size reassessment rule in a case study. For both randomization strategies, the maximum type I error rate increases with the effect size in the secondary endpoint and the correlation between endpoints. The maximum inflation increases with smaller block sizes if information on the block size is used in the reassessment rule. Based on our findings, we do not question the well-established use of blinded sample size reassessment methods with nuisance parameter estimates computed from the blinded interim data of the primary endpoint. However, we demonstrate that the type I error rate control of these methods relies on the application of specific, binding, pre-planned and fully algorithmic sample size reassessment rules and does not extend to general or unplanned sample size adjustments based on blinded data. © 2015 The Authors. Statistics in Medicine Published by John Wiley & Sons Ltd. © 2015 The Authors. Statistics in Medicine Published by John Wiley & Sons Ltd.

  18. UMTRA project water sampling and analysis plan, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1994-07-01

    Surface remedial action will be completed at the Grand Junction processing site during the summer of 1994. Results of 1993 water sampling indicate that ground water flow conditions and ground water quality at the processing site have remained relatively constant with time. Uranium concentrations in ground water continue to exceed the maximum concentration limits, providing the best indication of the extent of contaminated ground water. Evaluation of surface water quality of the Colorado River indicate no impact from uranium processing activities. No compliance monitoring at the Cheney disposal site has been proposed because ground water in the Dakota Sandstone (uppermost aquifer) is classified as limited-use (Class 111) and because the disposal cell is hydrogeologically isolated from the uppermost aquifer. The following water sampling and water level monitoring activities are planned for calendar year 1994: (i) Semiannual (early summer and late fall) sampling of six existing monitor wells at the former Grand Junction processing site. Analytical results from this sampling will be used to continue characterizing hydrogeochemical trends in background ground water quality and in the contaminated ground water area resulting from source term (tailings) removal. (ii) Water level monitoring of approximately three proposed monitor wells projected to be installed in the alluvium at the processing site in September 1994. Data loggers will be installed in these wells, and water levels will be electronically monitored six times a day. These long-term, continuous ground water level data will be collected to better understand the relationship between surface and ground water at the site. Water level and water quality data eventually will be used in future ground water modeling to establish boundary conditions in the vicinity of the Grand Junction processing site. Modeling results will be used to help demonstrate and document the potential remedial alternative of natural flushing

  19. Block and sub-block boundary strengthening in lath martensite

    NARCIS (Netherlands)

    Du, C.; Hoefnagels, J.P.M.; Vaes, R.; Geers, M.G.D.

    2016-01-01

    Well-defined uniaxial micro-tensile tests were performed on lath martensite single block specimens and multi-block specimens with different number of block boundaries parallel to the loading direction. Detailed slip trace analyses consistently revealed that in the {110}<111> slip system with the

  20. On the Eigenvalues and Eigenvectors of Block Triangular Preconditioned Block Matrices

    KAUST Repository

    Pestana, Jennifer

    2014-01-01

    Block lower triangular matrices and block upper triangular matrices are popular preconditioners for 2×2 block matrices. In this note we show that a block lower triangular preconditioner gives the same spectrum as a block upper triangular preconditioner and that the eigenvectors of the two preconditioned matrices are related. © 2014 Society for Industrial and Applied Mathematics.

  1. Oil sands mine planning and waste management using goal programming

    Energy Technology Data Exchange (ETDEWEB)

    Ben-Awuah, E.; Askari-Nasab, H. [Alberta Univ., Edmonton, AB (Canada). Dept. of Civil and Environmental Engineering; Alberta Univ., Edmonton, AB (Canada). Mining Optimization Laboratory

    2010-07-01

    A goal programming method was used to plan waste management processes at an oil sands mine. This method requires the decision maker (DM) to set goals. Mine planning is used to determine a block extraction schedule that maximizes net present value (NPV). Due to land restrictions, tailings facilities are sited within the pit area and dykes are used to contain the tailings. Many of the materials used to construct the dykes come from the mining operation. The mine plan scheduled both ore and dyke material concurrently. Dykes were constructed simultaneously as the mine phase advanced. A model was used to classify an oil sands block model into different material types. A mixed integer goal programming (MIGP) method was used to generate a strategic schedule. Block clustering techniques were used to large-scale mine planning projects. The method was used to verify and validate synthetic and real case data related to the cost of mining all material as waste, and the extra cost of mining dyke material. A case study of an oil sands project was used to demonstrate the method. The study showed that the developed model generates a smooth and uniform strategic schedule for large-scale mine planning projects. tabs., figs.

  2. Oil sands mine planning and waste management using goal programming

    International Nuclear Information System (INIS)

    Ben-Awuah, E.; Askari-Nasab, H.; Alberta Univ., Edmonton, AB

    2010-01-01

    A goal programming method was used to plan waste management processes at an oil sands mine. This method requires the decision maker (DM) to set goals. Mine planning is used to determine a block extraction schedule that maximizes net present value (NPV). Due to land restrictions, tailings facilities are sited within the pit area and dykes are used to contain the tailings. Many of the materials used to construct the dykes come from the mining operation. The mine plan scheduled both ore and dyke material concurrently. Dykes were constructed simultaneously as the mine phase advanced. A model was used to classify an oil sands block model into different material types. A mixed integer goal programming (MIGP) method was used to generate a strategic schedule. Block clustering techniques were used to large-scale mine planning projects. The method was used to verify and validate synthetic and real case data related to the cost of mining all material as waste, and the extra cost of mining dyke material. A case study of an oil sands project was used to demonstrate the method. The study showed that the developed model generates a smooth and uniform strategic schedule for large-scale mine planning projects. tabs., figs.

  3. Powder wastes confinement block and manufacturing process of this block

    International Nuclear Information System (INIS)

    Dagot, L.; Brunel, G.

    1996-01-01

    This invention concerns a powder wastes containment block and a manufacturing process of this block. In this block, the waste powder is encapsulated in a thermo hardening polymer as for example an epoxy resin, the encapsulated resin being spread into cement. This block can contain between 45 and 55% in mass of wastes, between 18 and 36% in mass of polymer and between 14 and 32% in mass of cement. Such a containment block can be used for the radioactive wastes storage. (O.M.). 4 refs

  4. Population Blocks.

    Science.gov (United States)

    Smith, Martin H.

    1992-01-01

    Describes an educational game called "Population Blocks" that is designed to illustrate the concept of exponential growth of the human population and some potential effects of overpopulation. The game material consists of wooden blocks; 18 blocks are painted green (representing land), 7 are painted blue (representing water); and the remaining…

  5. Effects of Single Nucleotide Polymorphism Marker Density on Haplotype Block Partition

    Directory of Open Access Journals (Sweden)

    Sun Ah Kim

    2016-12-01

    Full Text Available Many researchers have found that one of the most important characteristics of the structure of linkage disequilibrium is that the human genome can be divided into non-overlapping block partitions in which only a small number of haplotypes are observed. The location and distribution of haplotype blocks can be seen as a population property influenced by population genetic events such as selection, mutation, recombination and population structure. In this study, we investigate the effects of the density of markers relative to the full set of all polymorphisms in the region on the results of haplotype partitioning for five popular haplotype block partition methods: three methods in Haploview (confidence interval, four gamete test, and solid spine, MIG++ implemented in PLINK 1.9 and S-MIG++. We used several experimental datasets obtained by sampling subsets of single nucleotide polymorphism (SNP markers of chromosome 22 region in the 1000 Genomes Project data and also the HapMap phase 3 data to compare the results of haplotype block partitions by five methods. With decreasing sampling ratio down to 20% of the original SNP markers, the total number of haplotype blocks decreases and the length of haplotype blocks increases for all algorithms. When we examined the marker-independence of the haplotype block locations constructed from the datasets of different density, the results using below 50% of the entire SNP markers were very different from the results using the entire SNP markers. We conclude that the haplotype block construction results should be used and interpreted carefully depending on the selection of markers and the purpose of the study.

  6. Zoonoses action plan Salmonella monitoring programme: an investigation of the sampling protocol.

    Science.gov (United States)

    Snary, E L; Munday, D K; Arnold, M E; Cook, A J C

    2010-03-01

    The Zoonoses Action Plan (ZAP) Salmonella Programme was established by the British Pig Executive to monitor Salmonella prevalence in quality-assured British pigs at slaughter by testing a sample of pigs with a meat juice enzyme-linked immunosorbent assay for antibodies against group B and C(1) Salmonella. Farms were assigned a ZAP level (1 to 3) depending on the monitored prevalence, and ZAP 2 or 3 farms were required to act to reduce the prevalence. The ultimate goal was to reduce the risk of human salmonellosis attributable to British pork. A mathematical model has been developed to describe the ZAP sampling protocol. Results show that the probability of assigning a farm the correct ZAP level was high, except for farms that had a seroprevalence close to the cutoff points between different ZAP levels. Sensitivity analyses identified that the probability of assigning a farm to the correct ZAP level was dependent on the sensitivity and specificity of the test, the number of batches taken to slaughter each quarter, and the number of samples taken per batch. The variability of the predicted seroprevalence was reduced as the number of batches or samples increased and, away from the cutoff points, the probability of being assigned the correct ZAP level increased as the number of batches or samples increased. In summary, the model described here provided invaluable insight into the ZAP sampling protocol. Further work is required to understand the impact of the program for Salmonella infection in British pig farms and therefore on human health.

  7. Block Copolymer Adhesion Measured by Contact Mechanics Methods

    Science.gov (United States)

    Falsafi, A.; Bates, S.; Tirrell, M.; Pocius, A. V.

    1997-03-01

    Adhesion measurements for a series of polyolefin diblocks and triblocks are presented. These materials have poly(ethylene-propylene) or poly(ethyl-ethylene) rubbery block, and semicrystalline polyethylene block as physical crosslinker. The experiments consist of compression and decompression profiles of contact area between the samples as a function of normal load, analyzed by the JKR Theory. The samples are prepared either by formation of caps from the bulk material in melting and subsequent cooling, and/or coating them in thin films on surface modified elastic foundations of polydimethylsiloxane caps. The latter minimizes the viscoelastic losses which are dominant in the bulk of material. The effect of molecular architecture and microstructure on adhesion energy and dynamics of separation, obtained from decompression experiments, is discussed in view of their influence on molecular arrangements at the contacting surfaces.

  8. Technology Development and Advanced Planning for Curation of Returned Mars Samples

    Science.gov (United States)

    Lindstrom, David J.; Allen, Carlton C.

    2002-01-01

    NASA Johnson Space Center (JSC) curates extraterrestrial samples, providing the international science community with lunar rock and soil returned by the Apollo astronauts, meteorites collected in Antarctica, cosmic dust collected in the stratosphere, and hardware exposed to the space environment. Curation comprises initial characterization of new samples, preparation and allocation of samples for research, and clean, secure long-term storage. The foundations of this effort are the specialized cleanrooms (class 10 to 10,000) for each of the four types of materials, the supporting facilities, and the people, many of whom have been doing detailed work in clean environments for decades. JSC is also preparing to curate the next generation of extraterrestrial samples. These include samples collected from the solar wind, a comet, and an asteroid. Early planning and R\\&D are underway to support post-mission sample handling and curation of samples returned from Mars. One of the strong scientific reasons for returning samples from Mars is to search for evidence of current or past life in the samples. Because of the remote possibility that the samples may contain life forms that are hazardous to the terrestrial biosphere, the National Research Council has recommended that all samples returned from Mars be kept under strict biological containment until tests show that they can safely be released to other laboratories. It is possible that Mars samples may contain only scarce or subtle traces of life or prebiotic chemistry that could readily be overwhelmed by terrestrial contamination . Thus, the facilities used to contain, process, and analyze samples from Mars must have a combination of high-level biocontainment and organic / inorganic chemical cleanliness that is unprecedented. JSC has been conducting feasibility studies and developing designs for a sample receiving facility that would offer biocontainment at least the equivalent of current maximum containment BSL-4 (Bio

  9. Rate-distortion optimization for compressive video sampling

    Science.gov (United States)

    Liu, Ying; Vijayanagar, Krishna R.; Kim, Joohee

    2014-05-01

    The recently introduced compressed sensing (CS) framework enables low complexity video acquisition via sub- Nyquist rate sampling. In practice, the resulting CS samples are quantized and indexed by finitely many bits (bit-depth) for transmission. In applications where the bit-budget for video transmission is constrained, rate- distortion optimization (RDO) is essential for quality video reconstruction. In this work, we develop a double-level RDO scheme for compressive video sampling, where frame-level RDO is performed by adaptively allocating the fixed bit-budget per frame to each video block based on block-sparsity, and block-level RDO is performed by modelling the block reconstruction peak-signal-to-noise ratio (PSNR) as a quadratic function of quantization bit-depth. The optimal bit-depth and the number of CS samples are then obtained by setting the first derivative of the function to zero. In the experimental studies the model parameters are initialized with a small set of training data, which are then updated with local information in the model testing stage. Simulation results presented herein show that the proposed double-level RDO significantly enhances the reconstruction quality for a bit-budget constrained CS video transmission system.

  10. Dispersion patterns and sampling plans for Diaphorina citri (Hemiptera: Psyllidae) in citrus.

    Science.gov (United States)

    Sétamou, Mamoudou; Flores, Daniel; French, J Victor; Hall, David G

    2008-08-01

    The abundance and spatial dispersion of Diaphorina citri Kuwayama (Hemiptera: Psyllidae) were studied in 34 grapefruit (Citrus paradisi Macfad.) and six sweet orange [Citrus sinensis (L.) Osbeck] orchards from March to August 2006 when the pest is more abundant in southern Texas. Although flush shoot infestation levels did not vary with host plant species, densities of D. citri eggs, nymphs, and adults were significantly higher on sweet orange than on grapefruit. D. citri immatures also were found in significantly higher numbers in the southeastern quadrant of trees than other parts of the canopy. The spatial distribution of D. citri nymphs and adults was analyzed using Iowa's patchiness regression and Taylor's power law. Taylor's power law fitted the data better than Iowa's model. Based on both regression models, the field dispersion patterns of D. citri nymphs and adults were aggregated among flush shoots in individual trees as indicated by the regression slopes that were significantly >1. For the average density of each life stage obtained during our surveys, the minimum number of flush shoots per tree needed to estimate D. citri densities varied from eight for eggs to four flush shoots for adults. Projections indicated that a sampling plan consisting of 10 trees and eight flush shoots per tree would provide density estimates of the three developmental stages of D. citri acceptable enough for population studies and management decisions. A presence-absence sampling plan with a fixed precision level was developed and can be used to provide a quick estimation of D. citri populations in citrus orchards.

  11. Lexical Planning in Sentence Production Is Highly Incremental: Evidence from ERPs.

    Science.gov (United States)

    Zhao, Li-Ming; Yang, Yu-Fang

    2016-01-01

    The scope of lexical planning, which means how far ahead speakers plan lexically before they start producing an utterance, is an important issue for research into speech production, but remains highly controversial. The present research investigated this issue using the semantic blocking effect, which refers to the widely observed effects that participants take longer to say aloud the names of items in pictures when the pictures in a block of trials in an experiment depict items that belong to the same semantic category than different categories. As this effect is often interpreted as a reflection of difficulty in lexical selection, the current study took the semantic blocking effect and its associated pattern of event-related brain potentials (ERPs) as a proxy to test whether lexical planning during sentence production extends beyond the first noun when a subject noun-phrase includes two nouns, such as "The chair and the boat are both red" and "The chair above the boat is red". The results showed a semantic blocking effect both in onset latencies and in ERPs during the utterance of the first noun of these complex noun-phrases but not for the second noun. The indication, therefore, is that the lexical planning scope does not encompass this second noun-phrase. Indeed, the present findings are in line with accounts that propose radically incremental lexical planning, in which speakers plan ahead only one word at a time. This study also provides a highly novel example of using ERPs to examine the production of long utterances, and it is hoped the present demonstration of the effectiveness of this approach inspires further application of ERP techniques in this area of research.

  12. Dismantling of the EB experiment: Experimental research on the retrieved GBM and bentonite blocks

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Jiang-Feng, E-mail: jeafliu@hotmail.com [State Key Laboratory for Geomchanics & Deep Underground Engineering, and School of Mechanics and Civil Engineering, China University of Mining & Technology, Xuzhou, Jiangsu 221116 (China); Laboratoire de Méchanique de Lille (LML), and École Centrale de Lille, BP 48, F-59651 Villeneuve d’Ascq Cedex (France); Skoczylas, Frédéric [Laboratoire de Méchanique de Lille (LML), and École Centrale de Lille, BP 48, F-59651 Villeneuve d’Ascq Cedex (France); Talandier, Jean [ANDRA, 1-7 rue Jean Monnet, 92298 Châtenay-Malabry Cedex (France); Pu, Hai [State Key Laboratory for Geomchanics & Deep Underground Engineering, and School of Mechanics and Civil Engineering, China University of Mining & Technology, Xuzhou, Jiangsu 221116 (China)

    2016-04-15

    Graphical abstract: - Highlights: • We present a demonstration of a new concept of HLW (high-level waste) repositories. • The hydro-mechanical characteristics of GBM and blocks were determined. • The water retention curves (WRCs) of GBM and blocks were presented. • The effective gas permeability of the GBM and blocks were measured. • The homogeneity of the GBM and blocks were investigated. - Abstract: The Engineered Barrier Emplacement Experiment in Opalinus Clay (EB experiment) was a full-scale test for the demonstration of a new concept of high-level waste (HLW) repositories in horizontal drifts in the Opalinus Clay formation. After 10.5 years of hydration, the EB experiment was dismantled in autumn 2012. Samples obtained from the granular bentonite material (GBM), and bentonite blocks were sent to a laboratory for further analysis. The bentonite samples analyzed at the Laboratory of Mechanic of Lille (LML) were obtained from the CMT1, CMT2, CMT3 and RW sections. Their physical states were determined, as were their effective gas permeability and swelling capacity at different relative humidity (RH) levels. The results indicate that the water contents of the GBM determined in the laboratory ranged between 25.63% and 44.88% and that the dry densities ranged between 1.13 and 1.44 g/cm{sup 3}. The blocks had water contents similar to (or slightly higher than) those of the GBM, and their dry densities had decreased from an initial value of 1.69 g/cm{sup 3} to values close to 1.30 g/cm{sup 3}, which were similar to the average values found in the GBM. The effective gas permeabilities of the GBM samples were within the range of 1.50 × 10{sup −22} m{sup 2} and 1.03 × 10{sup −17} m{sup 2}, whereas, the corresponding values of the samples obtained from the blocks were between 2.20 × 10{sup −21} m{sup 2} and 5.12 × 10{sup −21} m{sup 2}. The permeability values are primarily related to the dry densities and water contents of the samples. Contact with

  13. SLS Block 1-B and Exploration Upper Stage Navigation System Design

    Science.gov (United States)

    Oliver, T. Emerson; Park, Thomas B.; Smith, Austin; Anzalone, Evan; Bernard, Bill; Strickland, Dennis; Geohagan, Kevin; Green, Melissa; Leggett, Jarred

    2018-01-01

    The SLS Block 1B vehicle is planned to extend NASA's heavy lift capability beyond the initial SLS Block 1 vehicle. The most noticeable change for this vehicle from SLS Block 1 is the swapping of the upper stage from the Interim Cryogenic Propulsion stage (ICPS), a modified Delta IV upper stage, to the more capable Exploration Upper Stage (EUS). As the vehicle evolves to provide greater lift capability and execute more demanding missions so must the SLS Integrated Navigation System to support those missions. The SLS Block 1 vehicle carries two independent navigation systems. The responsibility of the two systems is delineated between ascent and upper stage flight. The Block 1 navigation system is responsible for the phase of flight between the launch pad and insertion into Low-Earth Orbit (LEO). The upper stage system assumes the mission from LEO to payload separation. For the Block 1B vehicle, the two functions are combined into a single system intended to navigate from ground to payload insertion. Both are responsible for self-disposal once payload delivery is achieved. The evolution of the navigation hardware and algorithms from an inertial-only navigation system for Block 1 ascent flight to a tightly coupled GPS-aided inertial navigation system for Block 1-B is described. The Block 1 GN&C system has been designed to meet a LEO insertion target with a specified accuracy. The Block 1-B vehicle navigation system is designed to support the Block 1 LEO target accuracy as well as trans-lunar or trans-planetary injection accuracy. This is measured in terms of payload impact and stage disposal requirements. Additionally, the Block 1-B vehicle is designed to support human exploration and thus is designed to minimize the probability of Loss of Crew (LOC) through high-quality inertial instruments and Fault Detection, Isolation, and Recovery (FDIR) logic. The preliminary Block 1B integrated navigation system design is presented along with the challenges associated with

  14. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2000-01-01

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  15. The dependence of the modulation transfer function on the blocking layer thickness in amorphous selenium x-ray detectors

    International Nuclear Information System (INIS)

    Hunter, David M.; Belev, Gueorgi; DeCrescenzo, Giovanni; Kasap, Safa O.; Mainprize, James G.; Rowlands, J. A.; Smith, Charles; Tuemer, Tuemay; Verpakhovski, Vladimir; Yin Shi; Yaffe, Martin J.

    2007-01-01

    Blocking layers are used to reduce leakage current in amorphous selenium detectors. The effect of the thickness of the blocking layer on the presampling modulation transfer function (MTF) and on dark current was experimentally determined in prototype single-line CCD-based amorphous selenium (a-Se) x-ray detectors. The sampling pitch of the detectors evaluated was 25 μm and the blocking layer thicknesses varied from 1 to 51 μm. The blocking layers resided on the signal collection electrodes which, in this configuration, were used to collect electrons. The combined thickness of the blocking layer and a-Se bulk in each detector was ∼200 μm. As expected, the dark current increased monotonically as the thickness of the blocking layer was decreased. It was found that if the blocking layer thickness was small compared to the sampling pitch, it caused a negligible reduction in MTF. However, the MTF was observed to decrease dramatically at spatial frequencies near the Nyquist frequency as the blocking layer thickness approached or exceeded the electrode sampling pitch. This observed reduction in MTF is shown to be consistent with predictions of an electrostatic model wherein the image charge from the a-Se is trapped at a characteristic depth within the blocking layer, generally near the interface between the blocking layer and the a-Se bulk

  16. Application of polyhydroxybutyrate-b-polyethyleneglycol (a block co-polymer) for solid phase extraction of lead and copper in different food samples

    International Nuclear Information System (INIS)

    Kazi, T.G.; Afridi, H.I.; Tuzen, M.; Naeemullah, A.

    2014-01-01

    In present work, a new adsorbent, polyhydroxybutyrate-b-polyethyleneglycol (block copolymer) was used for the preconcentration and separation of copper (Cu) and lead (Pb) ions without consuming expensive complexing reagent. The influence of various parameters like pH, adsorbent amount, and rates of flow of eluent, sample and sample volumes has been investigated. The polymer does not interact with alkaline earth metals, transition metals, alkaline, and few anions. The enrichment factor 50 was achieved in this method. The detection limit of method was found to be 0.36 micro g L/sup 1/ and 1.93 micro g L/sup 1/ for copper and lead, respectively. The recovery values of both analytes were found >96% and relative standard deviations (RSD) for all experiments were found less than 5%. The present method was validated by the analysis of Cu and Pb contents in various related certified reference materials (CRM) like; NIST SRM 1515 Apple leaves, IAEA -336 Lichen and GBW-07605 Tea. Found results and CRM values were precise and accurate. This developed method was then successfully applied for analysis of Cu and Pb in tap and bottled mineral water and real food samples. (author)

  17. Thermal Analysis, Structural Studies and Morphology of Spider Silk-like Block Copolymers

    Science.gov (United States)

    Huang, Wenwen

    Spider silk is a remarkable natural block copolymer, which offers a unique combination of low density, excellent mechanical properties, and thermal stability over a wide range of temperature, along with biocompatibility and biodegrability. The dragline silk of Nephila clavipes, is one of the most well understood and the best characterized spider silk, in which alanine-rich hydrophobic blocks and glycine-rich hydrophilic blocks are linked together generating a functional block copolymer with potential uses in biomedical applications such as guided tissue repair and drug delivery. To provide further insight into the relationships among peptide amino acid sequence, block length, and physical properties, in this thesis, we studied synthetic proteins inspired by the genetic sequences found in spider dragline silks, and used these bioengineered spider silk block copolymers to study thermal, structural and morphological features. To obtain a fuller understanding of the thermal dynamic properties of these novel materials, we use a model to calculate the heat capacity of spider silk block copolymer in the solid or liquid state, below or above the glass transition temperature, respectively. We characterize the thermal phase transitions by temperature modulated differential scanning calorimetry (TMDSC) and thermogravimetric analysis (TGA). We also determined the crystallinity by TMDSC and compared the result with Fourier transform infrared spectroscopy (FTIR) and wide angle X-ray diffraction (WAXD). To understand the protein-water interactions with respect to the protein amino acid sequence, we also modeled the specific reversing heat capacity of the protein-water system, Cp(T), based on the vibrational, rotational and translational motions of protein amino acid residues and water molecules. Advanced thermal analysis methods using TMDSC and TGA show two glass transitions were observed in all samples during heating. The low temperature glass transition, Tg(1), is related to

  18. Optimal sampling plan for clean development mechanism lighting projects with lamp population decay

    International Nuclear Information System (INIS)

    Ye, Xianming; Xia, Xiaohua; Zhang, Jiangfeng

    2014-01-01

    Highlights: • A metering cost minimisation model is built with the lamp population decay to optimise CDM lighting projects sampling plan. • The model minimises the total metering cost and optimise the annual sample size during the crediting period. • The required 90/10 criterion sampling accuracy is satisfied for each CDM monitoring report. - Abstract: This paper proposes a metering cost minimisation model that minimises metering cost under the constraints of sampling accuracy requirement for clean development mechanism (CDM) energy efficiency (EE) lighting project. Usually small scale (SSC) CDM EE lighting projects expect a crediting period of 10 years given that the lighting population will decay as time goes by. The SSC CDM sampling guideline requires that the monitored key parameters for the carbon emission reduction quantification must satisfy the sampling accuracy of 90% confidence and 10% precision, known as the 90/10 criterion. For the existing registered CDM lighting projects, sample sizes are either decided by professional judgment or by rule-of-thumb without considering any optimisation. Lighting samples are randomly selected and their energy consumptions are monitored continuously by power meters. In this study, the sampling size determination problem is formulated as a metering cost minimisation model by incorporating a linear lighting decay model as given by the CDM guideline AMS-II.J. The 90/10 criterion is formulated as constraints to the metering cost minimisation problem. Optimal solutions to the problem minimise the metering cost whilst satisfying the 90/10 criterion for each reporting period. The proposed metering cost minimisation model is applicable to other CDM lighting projects with different population decay characteristics as well

  19. Molecular testing guidelines for lung adenocarcinoma: Utility of cell blocks and concordance between fine-needle aspiration cytology and histology samples

    Science.gov (United States)

    Heymann, Jonas J.; Bulman, William A.; Maxfield, Roger A.; Powell, Charles A.; Halmos, Balazs; Sonett, Joshua; Beaubier, Nike T.; Crapanzano, John P.; Mansukhani, Mahesh M.; Saqi, Anjali

    2014-01-01

    Background: Lung cancer is a leading cause of mortality, and patients often present at a late stage. More recently, advances in screening, diagnosing, and treating lung cancer have been made. For instance, greater numbers of minimally invasive procedures are being performed, and identification of lung adenocarcinoma driver mutations has led to the implementation of targeted therapies. Advances in molecular techniques enable use of scant tissue, including cytology specimens. In addition, per recently published consensus guidelines, cytology-derived cell blocks (CBs) are preferred over direct smears. Yet, limited comparison of molecular testing of fine-needle aspiration (FNA) CBs and corresponding histology specimens has been performed. This study aimed to establish concordance of epidermal growth factor receptor (EGFR) and Kirsten rat sarcoma (KRAS) virus homolog testing between FNA CBs and histology samples from the same patients. Materials and Methods: Patients for whom molecular testing for EGFR or KRAS was performed on both FNA CBs and histology samples containing lung adenocarcinoma were identified retrospectively. Following microdissection, when necessary, concordance of EGFR and KRAS molecular testing results between FNA CBs and histology samples was evaluated. Results: EGFR and/or KRAS testing was performed on samples obtained from 26 patients. Concordant results were obtained for all EGFR (22/22) and KRAS (17/17) mutation analyses performed. Conclusions: Identification of mutations in lung adenocarcinomas affects clinical decision-making, and it is important that results from small samples be accurate. This study demonstrates that molecular testing on cytology CBs is as sensitive and specific as that on histology. PMID:24987443

  20. Molecular testing guidelines for lung adenocarcinoma: Utility of cell blocks and concordance between fine-needle aspiration cytology and histology samples

    Directory of Open Access Journals (Sweden)

    Jonas J. Heymann

    2014-01-01

    Full Text Available Background: Lung cancer is a leading cause of mortality, and patients often present at a late stage. More recently, advances in screening, diagnosing, and treating lung cancer have been made. For instance, greater numbers of minimally invasive procedures are being performed, and identification of lung adenocarcinoma driver mutations has led to the implementation of targeted therapies. Advances in molecular techniques enable use of scant tissue, including cytology specimens. In addition, per recently published consensus guidelines, cytology-derived cell blocks (CBs are preferred over direct smears. Yet, limited comparison of molecular testing of fine-needle aspiration (FNA CBs and corresponding histology specimens has been performed. This study aimed to establish concordance of epidermal growth factor receptor (EGFR and Kirsten rat sarcoma (KRAS virus homolog testing between FNA CBs and histology samples from the same patients. Materials and Methods: Patients for whom molecular testing for EGFR or KRAS was performed on both FNA CBs and histology samples containing lung adenocarcinoma were identified retrospectively. Following microdissection, when necessary, concordance of EGFR and KRAS molecular testing results between FNA CBs and histology samples was evaluated. Results: EGFR and/or KRAS testing was performed on samples obtained from 26 patients. Concordant results were obtained for all EGFR (22/22 and KRAS (17/17 mutation analyses performed. Conclusions: Identification of mutations in lung adenocarcinomas affects clinical decision-making, and it is important that results from small samples be accurate. This study demonstrates that molecular testing on cytology CBs is as sensitive and specific as that on histology.

  1. Field sampling and analysis plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Boston, H.L.; Ashwood, T.L.; Borders, D.M.; Chidambariah, V.; Downing, D.J.; Fontaine, T.A.; Ketelle, R.H.; Lee, S.Y.; Miller, D.E.; Moore, G.K.; Suter, G.W.; Tardiff, M.F.; Watts, J.A.; Wickliff, D.S.

    1992-02-01

    This field sampling and analysis (S ampersand A) plan has been developed as part of the Department of Energy's (DOE's) remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) located in Oak Ridge, Tennessee. The S ampersand A plan has been written in support of the remedial investigation (RI) plan for WAG 2 (ORNL 1990). WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the ORNL main plant area, White Oak Lake (WOL), White Oak Creek embayment (WOCE) on the Clinch River, and the associated floodplain and subsurface environment (Fig. 1.1). The WOC system is the surface drainage for the major ORNL WAGs and has been exposed to a diversity of contaminants from operations and waste disposal activities in the WOC watershed. WAG 2 acts as a conduit through which hydrologic fluxes carry contaminants from upgradient areas to the Clinch River. Water, sediment, soil, and biota in WAG 2 are contaminated and continue to receive contaminants from upgradient WAGs. This document describes the following: an overview of the RI plan, background information for the WAG 2 system, and objectives of the S ampersand A plan; the scope and implementation of the first 2 years of effort of the S ampersand A plan and includes recent information about contaminants of concern, organization of S ampersand A activities, interactions with other programs, and quality assurance specific to the S ampersand A activities; provides details of the field sampling plans for sediment, surface water, groundwater, and biota, respectively; and describes the sample tracking and records management plan

  2. Routine Radiological Environmental Monitoring Plan. Appendices

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST

  3. Two-Dimensional Liquid Chromatography Analysis of Polystyrene/Polybutadiene Block Copolymers.

    Science.gov (United States)

    Lee, Sanghoon; Choi, Heejae; Chang, Taihyun; Staal, Bastiaan

    2018-05-15

    A detailed characterization of a commercial polystyrene/polybutadiene block copolymer material (Styrolux) was carried out using two-dimensional liquid chromatography (2D-LC). The Styrolux is prepared by statistical linking reaction of two different polystyrene- block-polybutadienyl anion precursors with a multivalent linking agent. Therefore, it is a mixture of a number of branched block copolymers different in molecular weight, composition, and chain architecture. While individual LC analysis, including size exclusion chromatography, interaction chromatography, or liquid chromatography at critical condition, is not good enough to resolve all the polymer species, 2D-LC separations coupling two chromatography methods were able to resolve all polymer species present in the sample; at least 13 block copolymer species and a homopolystyrene blended. Four different 2D-LC analyses combining a different pair of two LC methods provide their characteristic separation results. The separation characteristics of the 2D-LC separations are compared to elucidate the elution characteristics of the block copolymer species.

  4. Investigation of bacterial transport in the large-block test, a thermally perturbed block of Topopah Spring tuff

    Energy Technology Data Exchange (ETDEWEB)

    Chen, C.I.; Meike, A.; Chuu, Y.J.; Sawvel, A.; Lin, W.

    1999-07-01

    Transport of bacteria is investigated as part of the Large-Block Test (LBT), a thermally perturbed block of Topopah Spring tuff. Two bacterial species, Bacillus subtilis and Arthrobacter oxydans, were isolated from the Yucca Mountain Tuff. Natural mutants that can grow under the simultaneous presence of the two antibiotics, streptomycin and rifampicin, were selected from these species by laboratory procedures, cultured, and injected into the five heater boreholes of the large block hours before heating was initiated. The temperature, as measured 5 cm above one of the heater boreholes, rose slowly over a matter of months to a maximum of 142 C and to 60 C at the top and bottom of the block. Samples were collected from boreholes located approximately 5 ft below the injection points. Double-drug-resistant microbes also appeared in the heater boreholes where the temperature had been sustainably high throughout the test. The number of double-drug-resistant bacteria that were identified in the collection boreholes increased with time until the heater was deactivated. Negative indications in the collection holes after the heater was deactivated support the supposition that these bacteria were the species that were injected. An apparent homogeneous distribution among the collection boreholes suggests no pattern to the migration of bacteria through the block. The relationship between bacterial migration and the movement of water is not yet understood. These observations indicate the possibility of rapid bacterial transport in a thermally perturbed geologic setting. The implications for colloid transport need to be reviewed.

  5. Investigation of bacterial transport in the large-block test, a thermally perturbed block of Topopah Spring tuff

    International Nuclear Information System (INIS)

    Chen, C.I.; Meike, A.; Chuu, Y.J.; Sawvel, A.; Lin, W.

    1999-01-01

    Transport of bacteria is investigated as part of the Large-Block Test (LBT), a thermally perturbed block of Topopah Spring tuff. Two bacterial species, Bacillus subtilis and Arthrobacter oxydans, were isolated from the Yucca Mountain Tuff. Natural mutants that can grow under the simultaneous presence of the two antibiotics, streptomycin and rifampicin, were selected from these species by laboratory procedures, cultured, and injected into the five heater boreholes of the large block hours before heating was initiated. The temperature, as measured 5 cm above one of the heater boreholes, rose slowly over a matter of months to a maximum of 142 C and to 60 C at the top and bottom of the block. Samples were collected from boreholes located approximately 5 ft below the injection points. Double-drug-resistant microbes also appeared in the heater boreholes where the temperature had been sustainably high throughout the test. The number of double-drug-resistant bacteria that were identified in the collection boreholes increased with time until the heater was deactivated. Negative indications in the collection holes after the heater was deactivated support the supposition that these bacteria were the species that were injected. An apparent homogeneous distribution among the collection boreholes suggests no pattern to the migration of bacteria through the block. The relationship between bacterial migration and the movement of water is not yet understood. These observations indicate the possibility of rapid bacterial transport in a thermally perturbed geologic setting. The implications for colloid transport need to be reviewed

  6. Using LEGO Blocks for Technology-Mediated Task-Based English Language Learning

    Science.gov (United States)

    Gadomska, Agnieszka

    2015-01-01

    LEGO blocks have been played with by generations of children worldwide since the 1950s. It is undeniable that they boost creativity, eye-hand coordination, focus, planning, problem solving and many other skills. LEGO bricks have been also used by educators across the curricula as they are extremely motivating and engaging and, in effect, make…

  7. Sampling and analysis plan for sampling of liquid waste streams generated by 222-S Laboratory Complex operations

    International Nuclear Information System (INIS)

    Benally, A.B.

    1997-01-01

    This Sampling and Analysis Plan (SAP) establishes the requirements and guidelines to be used by the Waste Management Federal Services of Hanford, Inc. personnel in characterizing liquid waste generated at the 222-S Laboratory Complex. The characterization process to verify the accuracy of process knowledge used for designation and subsequent management of wastes consists of three steps: to prepare the technical rationale and the appendix in accordance with the steps outlined in this SAP; to implement the SAP by sampling and analyzing the requested waste streams; and to compile the report and evaluate the findings to the objectives of this SAP. This SAP applies to portions of the 222-S Laboratory Complex defined as Generator under the Resource Conservation and Recovery Act (RCRA). Any portion of the 222-S Laboratory Complex that is defined or permitted under RCRA as a treatment, storage, or disposal (TSD) facility is excluded from this document. This SAP applies to the liquid waste generated in the 222-S Laboratory Complex. Because the analytical data obtained will be used to manage waste properly, including waste compatibility and waste designation, this SAP will provide directions for obtaining and maintaining the information as required by WAC173-303

  8. Sampling and analysis plan for remediation of Operable Unit 100-IU-3 waste site 600-104. Revision 1

    International Nuclear Information System (INIS)

    1997-08-01

    This sampling and analysis plan presents the rationale and strategy for the sampling and analysis activities to support remediation of 100-IU-3 Operable Unit waste site 600-104. The purpose of the proposed sampling and analysis activities is to demonstrate that time-critical remediation of the waste site for soil containing 2,4-Dichlorophenoxyacetic acid salts and esters (2,4-D) and dioxin/furan isomers at concentrations that exceed cleanup levels has been effective. This shall be accomplished by sampling various locations of the waste site before and after remediation, analyzing the samples, and comparing the results to action levels set by the Washington State Department of Ecology

  9. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    International Nuclear Information System (INIS)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S ampersand A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S ampersand A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI

  10. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI.

  11. Rapid detailed characterization of concrete shielding blocks utilizing internal natural radionuclides for calibration

    International Nuclear Information System (INIS)

    McDonald, R.J.; Smith, A.R.; Norman, E.B.; Cowles, D.

    1995-10-01

    Following many years of productive work, the SuperHILAC and Bevalac accelerators at Lawrence Berkeley National Laboratory were closed, leaving thousands of concrete shielding blocks available for reuse or disposal. The process history of these blocks as shielding precludes free release pending radiological characterization. This paper presents a method for the rapid characterization of gamma-ray-emitting radioisotopes in large samples of earth-like materials: concrete shielding blocks in this case. Active regions are identified with a sensitive radiation-survey instrument and then examined in detail with a high-efficiency lead-shielded Ge spectrometer. Naturally-occurring gamma-ray emissions from the decays of uranium, thorium, and potassium are used to calibrate the spectrometer. A simple relationship exists between the observed counting rate in a characteristic gamma ray and the activity in the block. This method, taking only tens of minutes per sample at the nano-Curie/gram sensitivity level, replaces much of the expensive coring and laboratory analysis methods needed otherwise

  12. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2000-05-23

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  13. A general approach to analyse preconditioners two-by-two block matrices

    Czech Academy of Sciences Publication Activity Database

    Axelsson, Owe

    2012-01-01

    Roč. 19, č. 2 (2012), s. 1-20 ISSN 1070-5325 R&D Projects: GA ČR GA105/09/1830 Institutional research plan: CEZ:AV0Z30860518 Keywords : block preconditioning * nonsymmetric matrices * saddle point systems Subject RIV: BA - General Mathematics Impact factor: 1.202, year: 2012 http://www.quosafulltext.com/sc_ddm/sc_ddm.jsp

  14. Generalized Block Failure

    DEFF Research Database (Denmark)

    Jönsson, Jeppe

    2015-01-01

    Block tearing is considered in several codes as a pure block tension or a pure block shear failure mechanism. However in many situations the load acts eccentrically and involves the transfer of a substantial moment in combination with the shear force and perhaps a normal force. A literature study...... shows that no readily available tests with a well-defined substantial eccentricity have been performed. This paper presents theoretical and experimental work leading towards generalized block failure capacity methods. Simple combination of normal force, shear force and moment stress distributions along...... yield lines around the block leads to simple interaction formulas similar to other interaction formulas in the codes....

  15. Rulison Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile

  16. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control

  17. Epidural block

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/patientinstructions/000484.htm Epidural block - pregnancy To use the sharing features on this page, please enable JavaScript. An epidural block is a numbing medicine given by injection (shot) ...

  18. Estimating the intensity of ward admission and its effect on emergency department access block.

    Science.gov (United States)

    Luo, Wei; Cao, Jiguo; Gallagher, Marcus; Wiles, Janet

    2013-07-10

    Emergency department access block is an urgent problem faced by many public hospitals today. When access block occurs, patients in need of acute care cannot access inpatient wards within an optimal time frame. A widely held belief is that access block is the end product of a long causal chain, which involves poor discharge planning, insufficient bed capacity, and inadequate admission intensity to the wards. This paper studies the last link of the causal chain-the effect of admission intensity on access block, using data from a metropolitan hospital in Australia. We applied several modern statistical methods to analyze the data. First, we modeled the admission events as a nonhomogeneous Poisson process and estimated time-varying admission intensity with penalized regression splines. Next, we established a functional linear model to investigate the effect of the time-varying admission intensity on emergency department access block. Finally, we used functional principal component analysis to explore the variation in the daily time-varying admission intensities. The analyses suggest that improving admission practice during off-peak hours may have most impact on reducing the number of ED access blocks. Copyright © 2012 John Wiley & Sons, Ltd.

  19. Engineering task plan for development, fabrication, and deployment of nested, fixed depth fluidic sampling and at-tank analysis systems

    International Nuclear Information System (INIS)

    REICH, F.R.

    1999-01-01

    An engineering task plan was developed that presents the resources, responsibilities, and schedules for the development, test, and deployment of the nested, fixed-depth fluidic sampling and at-tank analysis system. The sampling system, deployed in the privatization contract double-shell tank feed tank, will provide waste samples for assuring the readiness of the tank for shipment to the privatization contractor for vitrification. The at-tank analysis system will provide ''real-time'' assessments of the sampled wastes' chemical and physical properties. These systems support the Hanford Phase 1B Privatization Contract

  20. DNA degrades during storage in formalin-fixed and paraffin-embedded tissue blocks.

    Science.gov (United States)

    Guyard, Alice; Boyez, Alice; Pujals, Anaïs; Robe, Cyrielle; Tran Van Nhieu, Jeanne; Allory, Yves; Moroch, Julien; Georges, Odette; Fournet, Jean-Christophe; Zafrani, Elie-Serge; Leroy, Karen

    2017-10-01

    Formalin-fixed paraffin-embedded (FFPE) tissue blocks are widely used to identify clinically actionable molecular alterations or perform retrospective molecular studies. Our goal was to quantify degradation of DNA occurring during mid to long-term storage of samples in usual conditions. We selected 46 FFPE samples of surgically resected carcinomas of lung, colon, and urothelial tract, of which DNA had been previously extracted. We performed a second DNA extraction on the same blocks under identical conditions after a median period of storage of 5.5 years. Quantitation of DNA by fluorimetry showed a 53% decrease in DNA quantity after storage. Quantitative PCR (qPCR) targeting KRAS exon 2 showed delayed amplification of DNA extracted after storage in all samples but one. The qPCR/fluorimetry quantification ratio decreased from 56 to 15% after storage (p DNA analyzable by qPCR represented only 11% of the amount obtained at first extraction. Maximal length of amplifiable DNA fragments assessed with a multiplex PCR was reduced in DNA extracted from stored tissue, indicating that DNA fragmentation had increased in the paraffin blocks during storage. Next-generation sequencing was performed on 12 samples and showed a mean 3.3-fold decrease in library yield and a mean 4.5-fold increase in the number of single-nucleotide variants detected after storage. In conclusion, we observed significant degradation of DNA extracted from the same FFPE block after 4 to 6 years of storage. Better preservation strategies should be considered for storage of FFPE biopsy specimens.

  1. Predictability of blocking

    International Nuclear Information System (INIS)

    Tosi, E.; Ruti, P.; Tibaldi, S.; D'Andrea, F.

    1994-01-01

    Tibaldi and Molteni (1990, hereafter referred to as TM) had previously investigated operational blocking predictability by the ECMWF model and the possible relationships between model systematic error and blocking in the winter season of the Northern Hemisphere, using seven years of ECMWF operational archives of analyses and day 1 to 10 forecasts. They showed that fewer blocking episodes than in the real atmosphere were generally simulated by the model, and that this deficiency increased with increasing forecast time. As a consequence of this, a major contribution to the systematic error in the winter season was shown to derive from the inability of the model to properly forecast blocking. In this study, the analysis performed in TM for the first seven winter seasons of the ECMWF operational model is extended to the subsequent five winters, during which model development, reflecting both resolution increases and parametrisation modifications, continued unabated. In addition the objective blocking index developed by TM has been applied to the observed data to study the natural low frequency variability of blocking. The ability to simulate blocking of some climate models has also been tested

  2. Phase 2 Sampling Plan for Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    CDM Federal Programs Corporation (CDM Federal) was contracted by Energy Systems to prepare a Phase II Sampling Plan to describe the field investigation work necessary to address regulatory agency review comments on the Remedial Investigation of the Filled Coal Ash Pond (FCAP)/Upper McCoy Branch, Chestnut Ridge Operable Unit 2 at the Y-12 Plant, conducted by CH2M Hill in 1990. The scope and approach of the field investigation described in this plan specifically focus on deficiencies noted by the regulators in discussions at the comment resolution meeting of May 8, 1992, in Oak Ridge, Tennessee. This Phase II Sampling Plan includes a field sampling plan, a field and laboratory quality assurance project plan, a health and safety plan, a waste management plan, and appendixes providing an update to the applicable or relevant and appropriate requirements for this site and field and laboratory testing methods and procedures

  3. Field Sampling Plan for the Operable Units 6-05 and 10-04 Remedial Action, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. Wells

    2006-11-14

    This Field Sampling Plan outlines the collection and analysis of samples in support of Phase IV of the Waste Area Group 10, Operable Units 6-05 and 10-04 remedial action. Phase IV addresses the remedial actions to areas with the potential for unexploded ordnance at the Idaho National Laboratory Site. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. The remedial action consists of removal and disposal of ordnance by high-order detonation, followed by sampling to determine the extent, if any, of soil that might have been contaminated by the detonation activities associated with the disposal of ordnance during the Phase IV activities and explosives during the Phase II activities.

  4. The management plan of liquid effluent in Korean advanced light water reactor

    International Nuclear Information System (INIS)

    Kim, S. H.; Lim, H. S.; Jeong, D. W.; Jeong, D. Y.

    2001-01-01

    Non-radioactive liquid effluent in Korean Advanced Light Water Reactor is transferred and treated in centralized waste treatment facility after the radioactivity in effluent is checked within power block. The liquid effluent from centralized waste treatment facility will be discharged by way of discharge canal in order to be in the sufficient condition. As a result of investigating the radiation monitoring design in accordance with 20 provisions by Korean Regulatory Authority, each effluent radiation monitoring with 20 provisions by Korean Regulatory Authority, each effluent radiation monitoring design satisfies the regulatory guideline. In relation to sampling and analyses, most systems satisfy the regulatory guideline except for some effluents from turbine building. And, though sampling and analyses are performed after radioactivity is monitored at each system in turbine building, these exceptions in turbine building effluents are expected to cause no significant problems because radioactivity is monitored by direct or indirect methods prior to release from turbine building. Integrated monitoring on liquid effluent from the centralized waste water treatment facility is not necessary because radiation monitoring, sampling and analyses on each system within power block are performed, and operational effectiveness compared with cost according to adding the radiation monitoring equipment is too low. So, whether the radiation monitoring in this effluent is reflected on design or not is planned to be determined through discussion with regulatory authority

  5. Access block in NSW hospitals, 1999-2001: does the definition matter?

    Science.gov (United States)

    Forero, Roberto; Mohsin, Mohammed; Bauman, Adrian E; Ieraci, Sue; Young, Lis; Phung, Hai N; Hillman, Kenneth M; McCarthy, Sally M; Hugelmeyer, C David

    2004-01-19

    To estimate the magnitude of access block and its trend over time in New South Wales hospitals, using different definitions of access block, and to explore its association with clinical and non-clinical factors. An epidemiological study using the Emergency Department Information System datasets (1 January 1999 to 31 December 2001) from a sample of 55 NSW hospitals. Prevalence of access block measured by four different definitions; strength of association between access block, type of hospital, year of presentation, mode and time of arrival, triage category (an indicator of urgency), age and sex. Rates of access block (for all four definitions) increased between 1999 and 2001 by 1%-2% per year. There were increases across all regions of NSW, but urban regions in particular. Patients presenting to Principal Referral hospitals and those who arrived at night were more likely to experience access block. After adjusting for triage category and year of presentation, the mode of arrival, time of arrival, type of hospital, age and sex were significantly associated with access block. Access block continues to increase across NSW, whatever the definition used. We recommend that hospitals in NSW and Australia move to the use of one standard definition of access block, as our study suggests there is no significant additional information emerging from the use of multiple definitions.

  6. Groundwater level monitoring sampling and analysis plan for the environmental monitoring plan at waste area grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document is the Groundwater Level Monitoring Sampling and Analysis Plan (SAP) for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). Note that this document is referred to as a SAP even though no sampling and analysis will be conducted. The term SAP is used for consistency. The procedures described herein are part of the Environmental Monitoring Plan (EMP) for WAG 6, which also includes monitoring tasks for seeps and springs, groundwater quality, surface water, and meteorological parameters. Separate SAPs are being issued concurrently to describe each of these monitoring programs. This SAP has been written for the use of the field personnel responsible for implementation of the EMP, with the intent that the field personnel will be able to take these documents to the field and quickly find the appropriate steps required to complete a specific task. In many cases, Field Operations Procedures (FOPs) will define the steps required for an activity. The FOPs for the EMP are referenced and briefly described in the relevant sections of the SAPs, and are contained within the FOP Manual. Both these documents (the SAP and the FOP Manual) will be available to personnel in the field.

  7. Groundwater level monitoring sampling and analysis plan for the environmental monitoring plan at waste area grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the Groundwater Level Monitoring Sampling and Analysis Plan (SAP) for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). Note that this document is referred to as a SAP even though no sampling and analysis will be conducted. The term SAP is used for consistency. The procedures described herein are part of the Environmental Monitoring Plan (EMP) for WAG 6, which also includes monitoring tasks for seeps and springs, groundwater quality, surface water, and meteorological parameters. Separate SAPs are being issued concurrently to describe each of these monitoring programs. This SAP has been written for the use of the field personnel responsible for implementation of the EMP, with the intent that the field personnel will be able to take these documents to the field and quickly find the appropriate steps required to complete a specific task. In many cases, Field Operations Procedures (FOPs) will define the steps required for an activity. The FOPs for the EMP are referenced and briefly described in the relevant sections of the SAPs, and are contained within the FOP Manual. Both these documents (the SAP and the FOP Manual) will be available to personnel in the field

  8. Measurement of radioactivity in the environment - Soil - Part 2: Guidance for the selection of the sampling strategy, sampling and pre-treatment of samples

    International Nuclear Information System (INIS)

    2007-01-01

    This part of ISO 18589 specifies the general requirements, based on ISO 11074 and ISO/IEC 17025, for all steps in the planning (desk study and area reconnaissance) of the sampling and the preparation of samples for testing. It includes the selection of the sampling strategy, the outline of the sampling plan, the presentation of general sampling methods and equipment, as well as the methodology of the pre-treatment of samples adapted to the measurements of the activity of radionuclides in soil. This part of ISO 18589 is addressed to the people responsible for determining the radioactivity present in soil for the purpose of radiation protection. It is applicable to soil from gardens, farmland, urban or industrial sites, as well as soil not affected by human activities. This part of ISO 18589 is applicable to all laboratories regardless of the number of personnel or the range of the testing performed. When a laboratory does not undertake one or more of the activities covered by this part of ISO 18589, such as planning, sampling or testing, the corresponding requirements do not apply. Information is provided on scope, normative references, terms and definitions and symbols, principle, sampling strategy, sampling plan, sampling process, pre-treatment of samples and recorded information. Five annexes inform about selection of the sampling strategy according to the objectives and the radiological characterization of the site and sampling areas, diagram of the evolution of the sample characteristics from the sampling site to the laboratory, example of sampling plan for a site divided in three sampling areas, example of a sampling record for a single/composite sample and example for a sample record for a soil profile with soil description. A bibliography is provided

  9. The implementation of binding blocks in the classroom

    Science.gov (United States)

    Wright, A. J.; Willett, H. V.; Beanland, S. R.; Carson, M.; Davies, R. A.; Duffett, G.; Pastore, A.

    2017-09-01

    We discuss a series of activities for A-level students which can be carried out using the binding blocks three dimensional chart of nuclides. The planned activities cover four main sections which can be linked to the A-level curriculum; nuclear decays (as seen through the different colours on the chart), medical physics (medical isotopes highlighted on the chart), fusion on Earth (binding energy demonstrated through tower heights) and stellar fusion (which has a limit at 56Fe, illustrated by the decreasing tower heights).

  10. Initial analysis and curation plans for MUSES-C asteroidal samples

    Science.gov (United States)

    Yano, H.; Kushiro, I.; Fujiwara, A.

    that there are a few more areas of expertise still lacked within the recommended members. Thus, the competition shall be repeated one or two more times (in early 2003 after the launch, and possibly in 2005 after in-situ data is obtained) in order to collect the best Japanese experts in the whole range of different types of analyses at the time of the sample return. The final members of the MASPET will be appointed about 2 years prior to the Earth return. Then they will conduct a Stest runT of the whole initial analysis procedures at the ISAS asteromaterial curation facility, to be newly created in next a few years, and their respective analysis facilities. This talk also covers the current concepts of the facility and plans of analysis procedure flow.

  11. Sampling Based Trajectory Planning for Robots in Dynamic Human Environments

    DEFF Research Database (Denmark)

    Svenstrup, Mikael

    2010-01-01

    Open-ended human environments, such as pedestrian streets, hospital corridors, train stations etc., are places where robots start to emerge. Hence, being able to plan safe and natural trajectories in these dynamic environments is an important skill for future generations of robots. In this work...... the problem is formulated as planning a minimal cost trajectory through a potential field, defined from the perceived position and motion of persons in the environment. A modified Rapidlyexploring Random Tree (RRT) algorithm is proposed as a solution to the planning problem. The algorithm implements a new...... for the uncertainty in the dynamic environment. The planning algorithm is demonstrated in a simulated pedestrian street environment....

  12. Homogeneous bilateral block shifts

    Indian Academy of Sciences (India)

    Douglas class were classified in [3]; they are unilateral block shifts of arbitrary block size (i.e. dim H(n) can be anything). However, no examples of irreducible homogeneous bilateral block shifts of block size larger than 1 were known until now.

  13. Sampling and analysis plan for the preoperational environmental survey for the immobilized low activity waste (ILAW) project W-465

    International Nuclear Information System (INIS)

    Mitchell, R.M.

    1998-01-01

    This document provides a detailed description of the Sampling and Analysis Plan for the Preoperational Survey to be conducted at the Immobilized Low Activity Waste (ILAW) Project Site in the 200 East Area

  14. Preoperative CT planning of screw length in arthroscopic Latarjet.

    Science.gov (United States)

    Hardy, Alexandre; Gerometta, Antoine; Granger, Benjamin; Massein, Audrey; Casabianca, Laurent; Pascal-Moussellard, Hugues; Loriaut, Philippe

    2018-01-01

    The Latarjet procedure has shown its efficiency for the treatment of anterior shoulder dislocation. The success of this technique depends on the correct positioning and fusion of the bone block. The length of the screws that fix the bone block can be a problem. They can increase the risk of non-union if too short or be the cause of nerve lesion or soft tissue discomfort if too long. Suprascapular nerve injuries have been reported during shoulder stabilisation surgery up to 6 % of the case. Bone block non-union depending on the series is found around 20 % of the cases. The purpose of this study was to evaluate the efficiency of this CT preoperative planning to predict optimal screws length. The clinical importance of this study lies in the observation that it is the first study to evaluate the efficiency of CT planning to predict screw length. Inclusion criteria were patients with chronic anterior instability of the shoulder with an ISIS superior to 4. Exclusion criteria were patients with multidirectional instability or any previous surgery on this shoulder. Thirty patients were included prospectively, 11 of them went threw a CT planning, before their arthroscopic Latarjet. Optimal length of both screws was calculated, adding the size of the coracoid at 5 and 15 mm from the tip to the glenoid. Thirty-two-mm screws were used for patients without planning. On a post-operative CT scan with 3D reconstruction, the distance between the screw tip and the posterior cortex was measured. A one-sample Wilcoxon test was used to compare the distance from the tip of the screw to an acceptable positioning of ±2 mm from the posterior cortex. In the group without planning, screw 1 tended to differ from the acceptable positioning: mean 3.44 mm ± 3.13, med 2.9 mm, q1; q3 [0.6; 4.75] p = 0.1118, and screw 2 differed significantly from the acceptable position: mean 4.83 mm ± 4.11, med 3.7 mm, q1; q3 [1.7; 5.45] p = 0.0045. In the group with planning, position of

  15. A RESEARCH ON DIGITAL TECHNOLOGY’S APPLICATION IN PRESERVATION PLANNING OF WENMING HISTORICAL AND CULTURAL BLOCK IN KUNMING

    Directory of Open Access Journals (Sweden)

    X. Huo

    2013-07-01

    Full Text Available The preservation of traditional settlements plays an indispensable part in the field of heritage preservation. The traditional settlements, definitely with cumulative developmental layers, vary in elements and involving numerous stakeholders; therefore, preservation objects and methods are quite complicated. The traditional heritage investigating and recording tools, such as manual mapping, photographing and field reconnaissance, which have exposed many limitations and deficiencies in the actual work, have defects to meet the requirements of settlement heritage preservation projects. This paper describes the process of applying of modern digital heritage recording and investigation technology (mobile GIS and 3D laser scanning technology in the preservation of Wenming historical and cultural blocks in Kunming and argues that Mobile GIS and 3D laser scanning technology are capable of producing a complete and efficient workflow, as well as providing fundamental technical support for heritage preservation work. Through the research, this paper draws a conclusion that the advantages of the workflow including: (1 accurate and convenient recording, (2 efficient comprehensive spatial analysing, and (3 better integrating protection planning with the later dynamic monitoring and management. Additionally, the author forecasts the prospects of the application of this workflow in the preservation and utilization of settlement heritage.

  16. Test Results of a Nb3Sn Wind/React ''Stress-Managed'' Block Dipole

    International Nuclear Information System (INIS)

    McInturff, A.; Bish, P.; Blackburn, R.; Diaczenko, N.; Elliott, T.; Hafalia Jr., R.; Henchel, W.; Jaisle, A.; Lau, W.; Lietzke, A.; McIntyre, P.; Noyes, P.; Nyman, M.; Sattarov, A.; Sattarov, A.

    2006-01-01

    A second phase of a highfield dipole technology development has been tested. A Nb3Sn block-coil model dipole was fabricated, using magnetic mirror geometry and wind/react coil technology. The primary objective of this phase was to make a first experimental test of the stress-management strategy pioneered at Texas A and M. In this strategy a high-strength support matrix is integrated with the windings to intercept Lorentz stress from the inner winding so that it does not accumulate in the outer winding. The magnet attained a field that was consistent with short sample limit on the first quench; there was no training. The decoupling of Lorentz stress between inner and outer windings was validated. In ramp rate studies the magnet exhibited a remarkable robustness in rapid ramping operation. It reached 85 percent of short sample(ss) current even while ramping 2-3 T/s. This robustness is attributed to the orientation of the Rutherford cables parallel to the field in the windings, instead of the transverse orientation that characterizes common dipole designs. Test results are presented and the next development phase plans are discussed

  17. Meteorological monitoring sampling and analysis plan for the environmental monitoring plan at Waste Area Grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This Sampling and Analysis Plan addresses meteorological monitoring activities that wall be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Lockheed Martin Energy Systems, Inc. Meteorological monitoring of various climatological parameters (e.g., temperature, wind speed, humidity) will be collected by instruments installed at WAG 6. Data will be recorded electronically at frequencies varying from 5-min intervals to 1-h intervals, dependent upon parameter. The data will be downloaded every 2 weeks, evaluated, compressed, and uploaded into a WAG 6 data base for subsequent use. The meteorological data will be used in water balance calculations in support of the WAG 6 hydrogeological model

  18. Development of connecting method for mechanically cut reinforced concrete blocks

    International Nuclear Information System (INIS)

    Nishiuchi, Tatsuo

    2005-01-01

    The purpose of the study is to develop a practical method of disposing and recycling in dismantled reinforced concrete structures. We have devised a new method in which mechanically cut reinforced concrete blocks are connected and they are reused as a structural beam. In this method, concrete blocks are connected with several steel bars and the connected surface is wrapped with a fiber sheet. We verified that the load capacity of renewal beams was considerably large as same as that of continuous structural beams on the basis of experimental as well as numerical analysis results. As far as construction cost of reinforced concrete walls are concerned, we demonstrated that the cost of this method is slightly lower than that of the plan to use new and recycle materials. (author)

  19. Detection block

    International Nuclear Information System (INIS)

    Bezak, A.

    1987-01-01

    A diagram is given of a detection block used for monitoring burnup of nuclear reactor fuel. A shielding block is an important part of the detection block. It stabilizes the fuel assembly in the fixing hole in front of a collimator where a suitable gamma beam is defined for gamma spectrometry determination of fuel burnup. The detector case and a neutron source case are placed on opposite sides of the fixing hole. For neutron measurement for which the water in the tank is used as a moderator, the neutron detector-fuel assembly configuration is selected such that neutrons from spontaneous fission and neutrons induced with the neutron source can both be measured. The patented design of the detection block permits longitudinal travel and rotation of the fuel assembly to any position, and thus more reliable determination of nuclear fuel burnup. (E.S.). 1 fig

  20. Seasonal phenology, spatial distribution, and sampling plan for the invasive mealybug Phenacoccus peruvianus (Hemiptera: Pseudococcidae).

    Science.gov (United States)

    Beltrá, A; Garcia-Marí, F; Soto, A

    2013-06-01

    Phlenacoccus peruvianus Granara de Willink (Hemiptera: Pseudococcidae) is an invasive mealybug of Neotropical origin. In recent years it has invaded the Mediterranean Basin causing significant damages in bougainvillea and other ornamental plants. This article examines its phenology, location on the plant and spatial distribution, and presents a sampling plan to determine P. peruvianus population density for the management of this mealybug in southern Europe. Six urban green spaces with bougainvillea plants were periodically surveyed between March 2008 and September 2010 in eastern Spain, sampling bracts, leaves, and twigs. Our results show that P. peruvianus abundance was high in spring and summer, declining to almost undetectable levels in autumn and winter. The mealybugs showed a preference for settling on bracts and there were no significant migrations between plant organs. P. peruvianus showed a highly aggregated distribution on bracts, leaves, and twigs. We recommend abinomial sampling of 200 leaves and an action threshold of 55% infested leaves for integrated pest management purposes on urban landscapes and enumerative sampling for ornamental nursery management and additional biological studies.

  1. Corganiser: a web-based software tool for planning time-sensitive sampling of whole rounds during scientific drilling

    DEFF Research Database (Denmark)

    Marshall, Ian

    2014-01-01

    with a wide range of core and section configurations and can thus be used in future drilling projects. Corganiser is written in the Python programming language and is implemented both as a graphical web interface and command-line interface. It can be accessed online at http://130.226.247.137/.......Corganiser is a software tool developed to simplify the process of preparing whole-round sampling plans for time-sensitive microbiology and geochemistry sampling during scientific drilling. It was developed during the Integrated Ocean Drilling Program (IODP) Expedition 347, but is designed to work...

  2. Investigation of bacterial transport in the large-block test, a thermally perturbed block of Topopah Spring Tuff

    International Nuclear Information System (INIS)

    Chen, C. I.; Chuu, Y. J.; Lin, W.; Meike, A.; Sawvel, A.

    1998-01-01

    This study investigates the transport of bacteria in a large, thermally perturbed block of Topopah Spring tuff. The study was part of the Large-Block Test (LBT), thermochemical and physical studies conducted on a 10 ft x 10 ft x 14 ft block of volcanic tuff excavated on 5 of 6 sides out of Fran Ridge, Nevada. Two bacterial species, Bacillus subtilis and Arthrobacter oxydans, were isolated from the Yucca Mountain tuff. Natural mutants that can grow under the simultaneous presence of the two antibiotics, streptomycin and rifampicin, were selected from these species by laboratory procedures. The double-drug-resistant mutants, which could be thus distinguished from the indigenous species, were injected into the five heater boreholes of the large block hours before heating was initiated. The temperature, as measured 5 cm above one of the heater boreholes, rose slowly and steadily over a matter of months to a maximum of 142 C. Samples (cotton cloths inserted the length of the hole, glass fiber swabs, and filter papers) were collected from the boreholes that were approximately 5 ft below the injection points. Double-drug-resistant bacteria were found in the collection boreholes nine months after injection. Surprisingly, they also appeared in the heater boreholes where the temperature had been sustainably high throughout the test. These bacteria appear to be the species that were injected. The number of double-drug-resistant bacteria that were identified in the collection boreholes increased with time. An apparent homogeneous distribution among the observation boreholes and heater boreholes suggests that a random motion could be the pattern that the bacteria migrated in the block. These observations indicated the possibility of rapid bacterial transport in a thermally perturbed geologic setting

  3. A binary logistic regression model with complex sampling design of unmet need for family planning among all women aged (15-49) in Ethiopia.

    Science.gov (United States)

    Workie, Demeke Lakew; Zike, Dereje Tesfaye; Fenta, Haile Mekonnen; Mekonnen, Mulusew Admasu

    2017-09-01

    Unintended pregnancy related to unmet need is a worldwide problem that affects societies. The main objective of this study was to identify the prevalence and determinants of unmet need for family planning among women aged (15-49) in Ethiopia. The Performance Monitoring and Accountability2020/Ethiopia was conducted in April 2016 at round-4 from 7494 women with two-stage-stratified sampling. Bi-variable and multi-variable binary logistic regression model with complex sampling design was fitted. The prevalence of unmet-need for family planning was 16.2% in Ethiopia. Women between the age range of 15-24 years were 2.266 times more likely to have unmet need family planning compared to above 35 years. Women who were currently married were about 8 times more likely to have unmet need family planning compared to never married women. Women who had no under-five child were 0.125 times less likely to have unmet need family planning compared to those who had more than two-under-5. The key determinants of unmet need family planning in Ethiopia were residence, age, marital-status, education, household members, birth-events and number of under-5 children. Thus the Government of Ethiopia would take immediate steps to address the causes of high unmet need for family planning among women.

  4. Synthesis of amylose-block-polystyrene rod-coil block copolymers

    NARCIS (Netherlands)

    Loos, Katja; Stadler, Reimund

    1997-01-01

    In the present communication we demonstrate the synthesis of a hybrid block copolymer based on the combination of a biopolymer (amylose) with a synthetic block (polystyrene). To obtain such materials, amino-functionalized polymers were modified with maltoheptaose moieties that serve as initiators

  5. Liposomal bupivacaine peripheral nerve block for the management of postoperative pain.

    Science.gov (United States)

    Hamilton, Thomas W; Athanassoglou, Vassilis; Trivella, Marialena; Strickland, Louise H; Mellon, Stephen; Murray, David; Pandit, Hemant G

    2016-08-25

    Postoperative pain remains a significant issue with poor perioperative pain management associated with an increased risk of morbidity and mortality. Liposomal bupivacaine is an analgesic consisting of bupivacaine hydrochloride encapsulated within multiple, non-concentric lipid bi-layers offering a novel method of sustained release. To assess the analgesic efficacy and adverse effects of liposomal bupivacaine infiltration peripheral nerve block for the management of postoperative pain. We identified randomised trials of liposomal bupivacaine peripheral nerve block for the management of postoperative pain. We searched the Cochrane Central Register of Controlled Trials (CENTRAL) (2016, Issue 1), Ovid MEDLINE (1946 to January Week 1 2016), Ovid MEDLINE In-Process (14 January 2016), EMBASE (1974 to 13 January 2016), ISI Web of Science (1945 to 14 January 2016), and reference lists of retrieved articles. We sought unpublished studies from Internet sources, and searched clinical trials databases for ongoing trials. The date of the most recent search was 15 January 2016. Randomised, double-blind, placebo- or active-controlled clinical trials of a single dose of liposomal bupivacaine administered as a peripheral nerve block in adults aged 18 years or over undergoing elective surgery at any surgical site. We included trials if they had at least two comparison groups for liposomal bupivacaine peripheral nerve block compared with placebo or other types of analgesia. Two review authors independently considered trials for inclusion in the review, assessed risk of bias, and extracted data. We performed analyses using standard statistical techniques as described in the Cochrane Handbook for Systematic Reviews of Interventions, using Review Manager 5. We planned to perform a meta-analysis, however there were insufficient data to ensure a clinically meaningful answer; as such we have produced a 'Summary of findings' table in a narrative format, and where possible we assessed the

  6. Off-site emergency planning in Czech Republic

    International Nuclear Information System (INIS)

    Prouza, Z.; Drabova, D.

    1996-01-01

    In the Czech Republic, the NPP Dukovany - PWR 440/213-type (4 blocks) is currently in operation (from 1985) and NPP Temelin - PWR 1000 (2 blocks) is under construction. Radiation accident on the NPP is defined as an unexpected or unintentional event in a facility with a potential of off-site consequences. The principles of emergency planning in Czech Republic now are based on the philosophy and principles described in the ICRP Publication 40 and the IAEA Safety Series No. 55, 72, and includes already the post Chernobyl experiences. Nevertheless, Czech Republic legislation experiences an extensive reconstruction. The Atomic Act, which will be based from point of view the structure, philosophy and principles on new International Basic Safety Standards, already being elaborated. That acts and related laws should solve our legislative problems on field of emergency planning and preparedness

  7. Paravertebral Block Plus Thoracic Wall Block versus Paravertebral Block Alone for Analgesia of Modified Radical Mastectomy: A Retrospective Cohort Study.

    Directory of Open Access Journals (Sweden)

    Nai-Liang Li

    Full Text Available Paravertebral block placement was the main anesthetic technique for modified radical mastectomy in our hospital until February 2014, when its combination with blocks targeting the pectoral musculature was initiated. We compared the analgesic effects of paravertebral blocks with or without blocks targeting the pectoral musculature for modified radical mastectomy.We retrospectively collected data from a single surgeon and anesthesiologist from June 1, 2012, to May 31, 2015. Intraoperative sedatives and analgesic requirements, time to the first analgesic request, postoperative analgesic doses, patient satisfaction, and complications were compared.Fifty-four patients received a paravertebral block alone (PECS 0, and 46 received a paravertebral block combined with blocks targeting the pectoral musculature (PECS 1. The highest intraoperative effect-site concentration of propofol was significantly lower in the PECS 1 group than in the PECS 0 group [2.3 (1.5, 2.8 vs 2.5 (1.5, 4 μg/mL, p = 0.0014]. The intraoperative rescue analgesic dose was significantly lower in the PECS 1 group [0 (0, 25 vs 0 (0, 75 mg of ketamine, p = 0.0384]. Furthermore, the PECS 1 group had a significantly longer time to the first analgesic request [636.5 (15, 720 vs 182.5 (14, 720 min, p = 0.0001]. After further adjustment for age, body mass index, American Society of Anesthesiologists Physical Status classification, chronic pain history, incidence of a superficial cervical plexus block placement, and operation duration, blocks targeting the pectoral musculature were determined to be the only significant factor (hazard ratio, 0.36; 95% confidence interval, 0.23-0.58; p < 0.0001. Very few patients used potent analgesics including morphine and ketorolac; the cumulative use of morphine or ketorolac was similar in the study groups. However, the incidence of all analgesic use, namely morphine, ketorolac, acetaminophen, and celecoxib, was significantly lower in the PECS 1 group [3

  8. Patent Blocking and Infringement and their Effects on Firms?

    DEFF Research Database (Denmark)

    Grimpe, Christoph; Hussinger, Katrin

    In recent years, firms have increasingly contributed to and been confronted with a patent landscape characterized by numerous but marginal inventions, overlapping claims and patent fences. As a result, firms risk to be blocked in their patent applications or to be infringed upon by rivals. While...... both aspects constitute major challenges for the appropriation of returns to inventive activity, extant literature suggests that participation in the market for technology might actually resolve or at least alleviate these problems. In this paper, we investigate the effect of patent blocking...... and infringement on firms’ engagement in in- and cross-licensing. Based on a sample of more than 1000 German manufacturing firms our results show that firms engage in in-licensing as a reaction to patent blocking and in both in- and cross-licensing if their protected IP was infringed upon. However, these effects...

  9. Highly conductive side chain block copolymer anion exchange membranes.

    Science.gov (United States)

    Wang, Lizhu; Hickner, Michael A

    2016-06-28

    Block copolymers based on poly(styrene) having pendent trimethyl styrenylbutyl ammonium (with four carbon ring-ionic group alkyl linkers) or benzyltrimethyl ammonium groups with a methylene bridge between the ring and ionic group were synthesized by reversible addition-fragmentation radical (RAFT) polymerization as anion exchange membranes (AEMs). The C4 side chain polymer showed a 17% increase in Cl(-) conductivity of 33.7 mS cm(-1) compared to the benzyltrimethyl ammonium sample (28.9 mS cm(-1)) under the same conditions (IEC = 3.20 meq. g(-1), hydration number, λ = ∼7.0, cast from DMF/1-propanol (v/v = 3 : 1), relative humidity = 95%). As confirmed by small angle X-ray scattering (SAXS), the side chain block copolymers with tethered ammonium cations showed well-defined lamellar morphologies and a significant reduction in interdomain spacing compared to benzyltrimethyl ammonium containing block copolymers. The chemical stabilities of the block copolymers were evaluated under severe, accelerated conditions, and degradation was observed by (1)H NMR. The block copolymer with C4 side chain trimethyl styrenylbutyl ammonium motifs displayed slightly improved stability compared to that of a benzyltrimethyl ammonium-based AEM at 80 °C in 1 M NaOD aqueous solution for 30 days.

  10. Sampling and Analysis Plan for Release of the 105-C Below-Grade Structures and Underlying Soils

    International Nuclear Information System (INIS)

    Bauer, R.G.

    1998-02-01

    This sampling and analysis plan (SAP) presents the rationale and strategies for the sampling, field measurements, and analyses of the below-grade concrete structures from the Hanford 105-C Reactor Building and the underlying soils consistent with the land-use assumptions in the Record of Decision for the U.S. Department of Energy 100-BC-1, 100-DR-1, and 100-HR-1 Operable Units (ROD) (EPA 1995). This structure is one of nine surplus production reactors in the 100 Area of the Hanford Site. This SAP is based on the data quality objectives developed for the 105-C below-grade structures and underlying soils (BHI 1997)

  11. Planning for the Collection and Analysis of Samples of Martian Granular Materials Potentially to be Returned by Mars Sample Return

    Science.gov (United States)

    Carrier, B. L.; Beaty, D. W.

    2017-12-01

    NASA's Mars 2020 rover is scheduled to land on Mars in 2021 and will be equipped with a sampling system capable of collecting rock cores, as well as a specialized drill bit for collecting unconsolidated granular material. A key mission objective is to collect a set of samples that have enough scientific merit to justify returning to Earth. In the case of granular materials, we would like to catalyze community discussion on what we would do with these samples if they arrived in our laboratories, as input to decision-making related to sampling the regolith. Numerous scientific objectives have been identified which could be achieved or significantly advanced via the analysis of martian rocks, "regolith," and gas samples. The term "regolith" has more than one definition, including one that is general and one that is much more specific. For the purpose of this analysis we use the term "granular materials" to encompass the most general meaning and restrict "regolith" to a subset of that. Our working taxonomy includes the following: 1) globally sourced airfall dust (dust); 2) saltation-sized particles (sand); 3) locally sourced decomposed rock (regolith); 4) crater ejecta (ejecta); and, 5) other. Analysis of martian granular materials could serve to advance our understanding areas including habitability and astrobiology, surface-atmosphere interactions, chemistry, mineralogy, geology and environmental processes. Results of these analyses would also provide input into planning for future human exploration of Mars, elucidating possible health and mechanical hazards caused by the martian surface material, as well as providing valuable information regarding available resources for ISRU and civil engineering purposes. Results would also be relevant to matters of planetary protection and ground-truthing orbital observations. We will present a preliminary analysis of the following, in order to generate community discussion and feedback on all issues relating to: What are the

  12. Statistical Analysis of the Links between Blocking and Nor'easters

    Science.gov (United States)

    Booth, J. F.; Pfahl, S.

    2015-12-01

    Nor'easters can be loosely defined as extratropical cyclones that develop as they progress northward along the eastern coast of North America. The path makes it possible for these storms to generate storm surge along the coastline and/or heavy precipitation or snow inland. In the present analysis, the path of the storms is investigated relative to the behavior of upstream blocking events over the North Atlantic Ocean. For this analysis, two separate Lagrangian tracking methods are used to identify the extratropical cyclone paths and the blocking events. Using the cyclone paths, Nor'easters are identified and blocking statistics are calculated for the days prior to, during and following the occurrence of the Nor'easters. The path, strength and intensification rates of the cyclones are compared with the strength and location of the blocks. In the event that a Nor'easter occurs, the likelihood of the presence of block at the southeast tip of Greenland is statistically significantly increased, i.e., the presence of a block concurrent with a Nor'easter happens more often than by random coincidence. However no significant link between the strength of the storms and the strength of the block is identified. These results suggest that the presence of the block mainly affects the path of the Nor'easters. On the other hand, in the event of blocking at the southeast tip of Greenland, the likelihood of a Nor'easter, as opposed to a different type of storm is no greater than what one might expect from randomly sampling cyclone tracks. The results confirm a long held understanding in forecast meteorology that upstream blocking is a necessary but not sufficient condition for generating a Nor'easter.

  13. Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental, LLC

    2011-09-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2012 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2012 is in accordance with the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. Modifications to the CY 2012 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan. The following sections of this report provide details regarding

  14. Influence of anchor block size on the thickness of adsorbed block copolymer layers

    NARCIS (Netherlands)

    Belder, G.F; ten Brinke, G.; Hadziioannou, G

    1997-01-01

    We present surface force data on three different polystyrene/poly(2-vinylpyridine) block copolymers (PS/P2VP) with a fixed size of the nonadsorbing PS block but widely varying sizes of the adsorbing P2VP block. With respect to the sizes of the two blocks, they range from moderately to highly

  15. Automatic block-matching registration to improve lung tumor localization during image-guided radiotherapy

    Science.gov (United States)

    Robertson, Scott Patrick

    To improve relatively poor outcomes for locally-advanced lung cancer patients, many current efforts are dedicated to minimizing uncertainties in radiotherapy. This enables the isotoxic delivery of escalated tumor doses, leading to better local tumor control. The current dissertation specifically addresses inter-fractional uncertainties resulting from patient setup variability. An automatic block-matching registration (BMR) algorithm is implemented and evaluated for the purpose of directly localizing advanced-stage lung tumors during image-guided radiation therapy. In this algorithm, small image sub-volumes, termed "blocks", are automatically identified on the tumor surface in an initial planning computed tomography (CT) image. Each block is independently and automatically registered to daily images acquired immediately prior to each treatment fraction. To improve the accuracy and robustness of BMR, this algorithm incorporates multi-resolution pyramid registration, regularization with a median filter, and a new multiple-candidate-registrations technique. The result of block-matching is a sparse displacement vector field that models local tissue deformations near the tumor surface. The distribution of displacement vectors is aggregated to obtain the final tumor registration, corresponding to the treatment couch shift for patient setup correction. Compared to existing rigid and deformable registration algorithms, the final BMR algorithm significantly improves the overlap between target volumes from the planning CT and registered daily images. Furthermore, BMR results in the smallest treatment margins for the given study population. However, despite these improvements, large residual target localization errors were noted, indicating that purely rigid couch shifts cannot correct for all sources of inter-fractional variability. Further reductions in treatment uncertainties may require the combination of high-quality target localization and adaptive radiotherapy.

  16. Preparing a Safety Analysis Report using the building block approach

    International Nuclear Information System (INIS)

    Herrington, C.C.

    1990-01-01

    The credibility of the applicant in a licensing proceeding is severely impacted by the quality of the license application, particularly the Safety Analysis Report. To ensure the highest possible credibility, the building block approach was devised to support the development of a quality Safety Analysis Report. The approach incorporates a comprehensive planning scheme that logically ties together all levels of the investigation and provides the direction necessary to prepare a superior Safety Analysis Report

  17. Combined KHFAC + DC nerve block without onset or reduced nerve conductivity after block

    Science.gov (United States)

    Franke, Manfred; Vrabec, Tina; Wainright, Jesse; Bhadra, Niloy; Bhadra, Narendra; Kilgore, Kevin

    2014-10-01

    Objective. Kilohertz frequency alternating current (KHFAC) waveforms have been shown to provide peripheral nerve conductivity block in many acute and chronic animal models. KHFAC nerve block could be used to address multiple disorders caused by neural over-activity, including blocking pain and spasticity. However, one drawback of KHFAC block is a transient activation of nerve fibers during the initiation of the nerve block, called the onset response. The objective of this study is to evaluate the feasibility of using charge balanced direct current (CBDC) waveforms to temporarily block motor nerve conductivity distally to the KHFAC electrodes to mitigate the block onset-response. Approach. A total of eight animals were used in this study. A set of four animals were used to assess feasibility and reproducibility of a combined KHFAC + CBDC block. A following randomized study, conducted on a second set of four animals, compared the onset response resulting from KHFAC alone and combined KHFAC + CBDC waveforms. To quantify the onset, peak forces and the force-time integral were measured during KHFAC block initiation. Nerve conductivity was monitored throughout the study by comparing muscle twitch forces evoked by supra-maximal stimulation proximal and distal to the block electrodes. Each animal of the randomized study received at least 300 s (range: 318-1563 s) of cumulative dc to investigate the impact of combined KHFAC + CBDC on nerve viability. Main results. The peak onset force was reduced significantly from 20.73 N (range: 18.6-26.5 N) with KHFAC alone to 0.45 N (range: 0.2-0.7 N) with the combined CBDC and KHFAC block waveform (p conductivity was observed after application of the combined KHFAC + CBDC block relative to KHFAC waveforms. Significance. The distal application of CBDC can significantly reduce or even completely prevent the KHFAC onset response without a change in nerve conductivity.

  18. Sampling and analysis plan for the 116-C-5 retention basins characteristic dangerous waste determination

    International Nuclear Information System (INIS)

    Bauer, R.G.; Dunks, K.L.

    1996-03-01

    Cooling water flow from the rear face of the 100-B and 100-C reactors was diverted to large retention basins prior to discharge to the Columbia River. These retention basins delayed the release of the reactor coolant for decay of the short-lived activation products and for thermal cooling. Some of the activation products were deposited in sludge that settled in the basins and discharge lines. In addition, some contamination was deposited in soil around the basins and associated piping. The sampling objective of this project is to determine if regulated levels of leachable lead are present in the abrasive materials used to decontaminate the retention basin tank walls, in the material between the tank base plate and the concrete foundation, and in the soils immediately surrounding the perimeter of the retention basins. Sampling details, including sampling locations, frequencies, and analytical requirements, are discussed. Also described is the quality assurance plan for this project

  19. Gulf of Mexico Sales 142 and 143: Central and western planning areas

    International Nuclear Information System (INIS)

    1992-11-01

    This environmental impact statement (EIS) addresses two proposed Federal actions, lease Sales 142 and 143, that will offer for lease Gulf of Mexico Outer Continental Shelf (OCS) areas that may contain economically recoverable oil and gas resources. The lease sales are proposed for 1993 and include lease blocks in the Central Gulf of Mexico Planning Area (CPA) and Western Gulf of Mexico Planning Area (WPA). Up to 10,099 blocks will be available for lease under the two proposed actions; only a small percentage is expected to be actually leased. On average, 401 blocks in the Central Gulf and 264 blocks in the Western Gulf have been leased in individual Gulf of Mexico OCS lease sales since 1984. Of the blocks that will be leased as a result of the two proposed actions, only a portion will be drilled and result in subsequent production. The scoping process was used to obtain information and comments on the proposed actions and the potential environmental effects from diverse interests, including the affected States, Federal agencies, the petroleum industry, environmental and public interest groups, and concerned individuals. This volume, Volume 2, reports on impacts from Sales 142 and 143

  20. The U.S. Geological Survey Geologic Collections Management System (GCMS)—A master catalog and collections management plan for U.S. Geological Survey geologic samples and sample collections

    Science.gov (United States)

    ,

    2015-01-01

    The U.S. Geological Survey (USGS) is widely recognized in the earth science community as possessing extensive collections of earth materials collected by research personnel over the course of its history. In 2006, a Geologic Collections Inventory was conducted within the USGS Geology Discipline to determine the extent and nature of its sample collections, and in 2008, a working group was convened by the USGS National Geologic and Geophysical Data Preservation Program to examine ways in which these collections could be coordinated, cataloged, and made available to researchers both inside and outside the USGS. The charge to this working group was to evaluate the proposition of creating a Geologic Collections Management System (GCMS), a centralized database that would (1) identify all existing USGS geologic collections, regardless of size, (2) create a virtual link among the collections, and (3) provide a way for scientists and other researchers to obtain access to the samples and data in which they are interested. Additionally, the group was instructed to develop criteria for evaluating current collections and to establish an operating plan and set of standard practices for handling, identifying, and managing future sample collections. Policies and procedures promoted by the GCMS would be based on extant best practices established by the National Science Foundation and the Smithsonian Institution. The resulting report—USGS Circular 1410, “The U.S. Geological Survey Geologic Collections Management System (GCMS): A Master Catalog and Collections Management Plan for U.S. Geological Survey Geologic Samples and Sample Collections”—has been developed for sample repositories to be a guide to establishing common practices in the collection, retention, and disposal of geologic research materials throughout the USGS.

  1. Block Least Mean Squares Algorithm over Distributed Wireless Sensor Network

    Directory of Open Access Journals (Sweden)

    T. Panigrahi

    2012-01-01

    Full Text Available In a distributed parameter estimation problem, during each sampling instant, a typical sensor node communicates its estimate either by the diffusion algorithm or by the incremental algorithm. Both these conventional distributed algorithms involve significant communication overheads and, consequently, defeat the basic purpose of wireless sensor networks. In the present paper, we therefore propose two new distributed algorithms, namely, block diffusion least mean square (BDLMS and block incremental least mean square (BILMS by extending the concept of block adaptive filtering techniques to the distributed adaptation scenario. The performance analysis of the proposed BDLMS and BILMS algorithms has been carried out and found to have similar performances to those offered by conventional diffusion LMS and incremental LMS algorithms, respectively. The convergence analyses of the proposed algorithms obtained from the simulation study are also found to be in agreement with the theoretical analysis. The remarkable and interesting aspect of the proposed block-based algorithms is that their communication overheads per node and latencies are less than those of the conventional algorithms by a factor as high as the block size used in the algorithms.

  2. Engineering task plan for the annual revision of the rotary mode core sampling system safety equipment list

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan addresses an effort to provide an update to the RMCS Systems 3 and 4 SEL and DCM in order to incorporate the changes to the authorization basis implemented by HNF-SD-WM-BIO-001, Rev. 0 (Draft), Addendum 5 , Safety Analysis for Rotary Mode Core Sampling. Responsibilities, task description, cost estimate, and schedule are presented

  3. Abdominal wall blocks in adults

    DEFF Research Database (Denmark)

    Børglum, Jens; Gögenür, Ismail; Bendtsen, Thomas F

    2016-01-01

    been introduced with success. Future research should also investigate the effect of specific abdominal wall blocks on neuroendocrine and inflammatory stress response after surgery.  Summary USG abdominal wall blocks in adults are commonplace techniques today. Most abdominal wall blocks are assigned......Purpose of review Abdominal wall blocks in adults have evolved much during the last decade; that is, particularly with the introduction of ultrasound-guided (USG) blocks. This review highlights recent advances of block techniques within this field and proposes directions for future research.......  Recent findings Ultrasound guidance is now considered the golden standard for abdominal wall blocks in adults, even though some landmark-based blocks are still being investigated. The efficiency of USG transversus abdominis plane blocks in relation to many surgical procedures involving the abdominal wall...

  4. Energy and climate: Brussels plan put to the test; Energie et climat: le plan de Bruxelles mis a l'epreuve

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2008-07-01

    In early 2008, the European Commission presented its highly ambitious plan to reduce greenhouse gas emissions. Two stumbling blocks stand in the way: industry's obvious reluctance, and the unanswered but crucial question of how to fund the proposed measures. Included are measures to reduce energy consumption, increase the share of renewable energies and boost energy efficiency. But controversy surrounds the proposed plan: nuclear power is ignored in the EU document, the plan price tag is 90 billion euros in 2020 and seven member states ask for clarification. The Commission is hoping for approval of its plan before the end of 2008.

  5. Comparative study between ultrasound guided TAP block and paravertebral block in upper abdominal surgeries

    Directory of Open Access Journals (Sweden)

    Ruqaya M Elsayed Goda

    2017-01-01

    Conclusion: We concluded that ultrasound guided transverses abdominis plane block and thoracic paravertebral block were safe and effective anesthetic technique for upper abdominal surgery with longer and potent postoperative analgesia in thoracic paravertebral block than transverses abdominis block.

  6. Household waste behaviours among a community sample in Iran: an application of the theory of planned behaviour.

    Science.gov (United States)

    Pakpour, Amir H; Zeidi, Isa Mohammadi; Emamjomeh, Mohammad Mahdi; Asefzadeh, Saeed; Pearson, Heidi

    2014-06-01

    Understanding the factors influencing recycling behaviour can lead to better and more effective recycling programs in a community. The goal of this study was to examine factors associated with household waste behaviours in the context of the theory of planned behaviour (TPB) among a community sample of Iranians that included data collection at time 1 and at follow-up one year later at time 2. Study participants were sampled from households under the coverage of eight urban health centers in the city of Qazvin. Of 2000 invited households, 1782 agreed to participate in the study. A self-reported questionnaire was used for assessing socio-demographic factors and the TPB constructs (i.e. attitude, subjective norms, perceived behavioural control, and intention). Furthermore, questions regarding moral obligation, self-identity, action planning, and past recycling behaviour were asked, creating an extended TPB. At time 2, participants were asked to complete a follow-up questionnaire on self-reported recycling behaviours. All TPB constructs had positive and significant correlations with each other. Recycling behaviour at time 1 (past behaviour) significantly related to household waste behaviour at time 2. The extended TPB explained 47% of the variance in household waste behaviour at time 2. Attitude, perceived behavioural control, intention, moral obligation, self-identity, action planning, and past recycling behaviour were significant predictors of household waste behaviour at time 2 in all models. The fact that the expanded TPB constructs significantly predicted household waste behaviours holds great promise for developing effective public campaigns and behaviour-changing interventions in a region where overall rates of household waste reduction behaviours are low. Our results indicate that educational materials which target moral obligation and action planning may be particularly effective. Copyright © 2013 Elsevier Ltd. All rights reserved.

  7. Kennedy Space Center Orion Processing Team Planning for Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

  8. Field sampling and analysis plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Boston, H.L.; Ashwood, T.L.; Borders, D.M.; Chidambariah, V.; Downing, D.J.; Fontaine, T.A.; Ketelle, R.H.; Lee, S.Y.; Miller, D.E.; Moore, G.K.; Suter, G.W.; Tardiff, M.F.; Watts, J.A.; Wickliff, D.S.

    1992-02-01

    This field sampling and analysis (S & A) plan has been developed as part of the Department of Energy`s (DOE`s) remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) located in Oak Ridge, Tennessee. The S & A plan has been written in support of the remedial investigation (RI) plan for WAG 2 (ORNL 1990). WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the ORNL main plant area, White Oak Lake (WOL), White Oak Creek embayment (WOCE) on the Clinch River, and the associated floodplain and subsurface environment (Fig. 1.1). The WOC system is the surface drainage for the major ORNL WAGs and has been exposed to a diversity of contaminants from operations and waste disposal activities in the WOC watershed. WAG 2 acts as a conduit through which hydrologic fluxes carry contaminants from upgradient areas to the Clinch River. Water, sediment, soil, and biota in WAG 2 are contaminated and continue to receive contaminants from upgradient WAGs. This document describes the following: an overview of the RI plan, background information for the WAG 2 system, and objectives of the S & A plan; the scope and implementation of the first 2 years of effort of the S & A plan and includes recent information about contaminants of concern, organization of S & A activities, interactions with other programs, and quality assurance specific to the S & A activities; provides details of the field sampling plans for sediment, surface water, groundwater, and biota, respectively; and describes the sample tracking and records management plan.

  9. Characterization of a Poly(styrene-block-methylacrylate-random-octadecylacrylate-block-styrene) Shape Memory ABA Triblock Copolymer

    Science.gov (United States)

    Fei, Pengzhan; Cavicchi, Kevin

    2011-03-01

    A new ABA triblock copolymer of poly(styrene-block- methylacrylate-random-octadecylacrylate-block-styrene) (PS-b- PMA-r-PODA-b-PS) was synthesized by reversible addition fragmentation chain transfer polymerization. The triblock copolymer can generate a three-dimensional, physically crosslinked network by self-assembly, where the glassy PS domains physically crosslink the midblock chains. The side chain crystallization of the polyoctadecylacrylare (PODA) side chain generates a second reversible network enabling shape memory properties. Shape memory tests by uniaxial deformation and recovery of molded dog-bone shape samples demonstrate that shape fixities above 96% and shape recoveries above 98% were obtained for extensional strains up to 300%. An outstanding advantage of this shape memory material is that it can be very easily shaped and remolded by elevating the temperature to 140circ; C, and after remolding the initial shape memory properties are totally recovered by eliminating the defects introduced by the previous deformation cycling.

  10. Technical basis and programmatic requirements for large block testing of coupled thermal-mechanical-hydrological-chemical processes

    International Nuclear Information System (INIS)

    Lin, Wunan.

    1993-09-01

    This document contains the technical basis and programmatic requirements for a scientific investigation plan that governs tests on a large block of tuff for understanding the coupled thermal- mechanical-hydrological-chemical processes. This study is part of the field testing described in Section 8.3.4.2.4.4.1 of the Site Characterization Plan (SCP) for the Yucca Mountain Project. The first, and most important objective is to understand the coupled TMHC processes in order to develop models that will predict the performance of a nuclear waste repository. The block and fracture properties (including hydrology and geochemistry) can be well characterized from at least five exposed surfaces, and the block can be dismantled for post-test examinations. The second objective is to provide preliminary data for development of models that will predict the quality and quantity of water in the near-field environment of a repository over the current 10,000 year regulatory period of radioactive decay. The third objective is to develop and evaluate the various measurement systems and techniques that will later be employed in the Engineered Barrier System Field Tests (EBSFT)

  11. Fermion-scalar conformal blocks

    Energy Technology Data Exchange (ETDEWEB)

    Iliesiu, Luca [Joseph Henry Laboratories, Princeton University,Washington Road, Princeton, NJ 08544 (United States); Kos, Filip [Department of Physics, Yale University,217 Prospect Street, New Haven, CT 06520 (United States); Poland, David [Department of Physics, Yale University,217 Prospect Street, New Haven, CT 06520 (United States); School of Natural Sciences, Institute for Advanced Study,1 Einstein Dr, Princeton, New Jersey 08540 (United States); Pufu, Silviu S. [Joseph Henry Laboratories, Princeton University,Washington Road, Princeton, NJ 08544 (United States); Simmons-Duffin, David [School of Natural Sciences, Institute for Advanced Study,1 Einstein Dr, Princeton, New Jersey 08540 (United States); Yacoby, Ran [Joseph Henry Laboratories, Princeton University,Washington Road, Princeton, NJ 08544 (United States)

    2016-04-13

    We compute the conformal blocks associated with scalar-scalar-fermion-fermion 4-point functions in 3D CFTs. Together with the known scalar conformal blocks, our result completes the task of determining the so-called ‘seed blocks’ in three dimensions. Conformal blocks associated with 4-point functions of operators with arbitrary spins can now be determined from these seed blocks by using known differential operators.

  12. Structural analysis of ceramic blocks sealing or structural incorporated with the industrial laundry sludge

    International Nuclear Information System (INIS)

    Almeida, P.H.S.; Grippe, V.Y.Q.; Goulart, J.V.

    2016-01-01

    Industrial and commercial development of recent decades has led to an increase in waste generation. Thus, it is necessary to develop alternative and effective methods of treatment, replacing the simple disposal of these wastes in landfills. The objective of this work is to study the incorporation of textile industrial laundries sludge in ceramic blocks sealing or structural. Samples of ceramic blocks were produced using formulation with 20% sludge, the mass of ceramic clay. Structural analysis of the block was observed the tendency of most empty emergence (pores) during the firing of the blocks, as textile sludge was added in the ceramic paste composition. The mechanical testing of blocks compressive strength was above the minimum 3.0 MPa specified by the standard limit. The physical test water absorption of the blocks was within the range 8 to 22% specified by the standard. (author)

  13. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  14. Knowledge, attitude and practice of family planning methods among the rural females of Bagbahara block Mahasamund district in Chhattishgarh State, India

    Directory of Open Access Journals (Sweden)

    Mohammad Jawed Quereishi

    2017-01-01

    Full Text Available Background If many women in Chhattisgarh are not using family planning, it is not due to a lack of knowledge. Knowledge of contraception is nearly universal; 98 percent of currently married women know at least one modern family planning method. Women are most familiar with female sterilization (97 percent, followed by male sterilization (86 percent, the pill (68 percent, the condom (55 percent, and the IUD (40 percent. About two out of every five women (43 percent have knowledge of at least one traditional method. Yet only 45 percent of married women in Chhattisgarh are currently using some method of contraception, about the same as in Madhya Pradesh (44 percent but less than the national average (48 percent. Contraceptive prevalence in Chhattisgarh is considerably higher in urban areas (59 percent than in rural areas (42 percent. Objectives To assess the knowledge, attitude and practice of family planning methods, and factors that could affect their use, among the rural females of reproductive age group (15-49 years. Methods A total of 326 females of reproductive age group (15-49years from the rural areas of Bagbahara block of Mahasamund district in Chhattisgarh state were selected randomly and interviewed with the help of semi-structured interview schedule, which consists of demographic data, questions related to knowledge, attitude and practice of different contraceptive methods and factors affecting the use of these methods. Results Most of the respondents (79% were aware of at least one contraceptive method. The most common source of information on contraception was Health staffs (46%, followed by ASHA (Mitanin workers (42.5%, media (7.5% and relatives/friends (4%. Knowledge of non-contraceptive benefits of family planning methods was claimed by only 19% of the respondents, while knowledge about various adverse effects was reported by 32% of the respondents. About 62% of respondents showed favourable attitude towards family planning methods

  15. Block Cipher Analysis

    DEFF Research Database (Denmark)

    Miolane, Charlotte Vikkelsø

    ensurethat no attack violatesthe securitybounds specifiedbygeneric attack namely exhaustivekey search and table lookup attacks. This thesis contains a general introduction to cryptography with focus on block ciphers and important block cipher designs, in particular the Advanced Encryption Standard(AES...... on small scale variants of AES. In the final part of the thesis we present a new block cipher proposal Present and examine its security against algebraic and differential cryptanalysis in particular....

  16. Origami-inspired building block and parametric design for mechanical metamaterials

    Science.gov (United States)

    Jiang, Wei; Ma, Hua; Feng, Mingde; Yan, Leilei; Wang, Jiafu; Wang, Jun; Qu, Shaobo

    2016-08-01

    An origami-based building block of mechanical metamaterials is proposed and explained by introducing a mechanism model based on its geometry. According to our model, this origami mechanism supports response to uniaxial tension that depends on structure parameters. Hence, its mechanical properties can be tunable by adjusting the structure parameters. Experiments for poly lactic acid (PLA) samples were carried out, and the results are in good agreement with those of finite element analysis (FEA). This work may be useful for designing building blocks of mechanical metamaterials or other complex mechanical structures.

  17. Origami-inspired building block and parametric design for mechanical metamaterials

    International Nuclear Information System (INIS)

    Jiang, Wei; Ma, Hua; Feng, Mingde; Yan, Leilei; Wang, Jiafu; Wang, Jun; Qu, Shaobo

    2016-01-01

    An origami-based building block of mechanical metamaterials is proposed and explained by introducing a mechanism model based on its geometry. According to our model, this origami mechanism supports response to uniaxial tension that depends on structure parameters. Hence, its mechanical properties can be tunable by adjusting the structure parameters. Experiments for poly lactic acid (PLA) samples were carried out, and the results are in good agreement with those of finite element analysis (FEA). This work may be useful for designing building blocks of mechanical metamaterials or other complex mechanical structures. (paper)

  18. Phase 2 Sampling Plan for Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-08-01

    CDM Federal Programs Corporation (CDM Federal) was contracted by Martin Marietta Energy Systems, Inc. to prepare a Phase H Sampling Plan to describe field investigation work necessary to address regulatory agency review comments on the Remedial Investigation of Filled Coal Ash Pond (FCAP)/Upper McCoy Branch, Chestnut Ridge Operable Unit 2 at the Y-12 Plant, conducted by CH2M Hill in 1990. The scope and approach of the field investigation described in this plan specifically focus on deficiencies noted by the regulators in discussions at the comment resolution meeting of May 8, 1992, in Oak Ridge, Tennessee. This Phase II Sampling Plan includes a field sampling plan, a field and laboratory quality assurance project plan, a health and safety plan, a waste management plan, and appendixes providing an update to applicable or relevant and appropriate requirements for this site and field and laboratory testing methods and procedures. To address deficiencies noted by the regulators, the following activities will be conducted: Background surface soil and surface water/sediment samples will be collected based on statistical considerations for comparison to site data. Existing and new data to be collected will be used to support a human health risk assessment that includes the future homesteader scenario. Biological surveys, samples, and measurements will be collected/conducted to augment existing data and support an ecological risk assessment. Another round of groundwater sampling will be conducted, including on-site wells and the wells on Chestnut Ridge downgradient of the Security Pits. Borings will be completed in the FCAP to collect samples from below the surface depth to describe the chemical characteristics and volume of the ash. The volume of ash associated with sluice channel on Chestnut Ridge will be determined. Soil samples will be corrected below the coal ash in the FCAP and adjacent to sluice channel to evaluate soil contamination and migration of contaminants

  19. CdS-containing nano-assemblies of double hydrophilic block copolymers in water

    Czech Academy of Sciences Publication Activity Database

    Uchman, M.; Procházka, K.; Gatsouli, K.; Pispas, S.; Špírková, Milena

    2011-01-01

    Roč. 289, č. 9 (2011), s. 1045-1053 ISSN 0303-402X R&D Projects: GA ČR GCP205/11/J043; GA ČR GAP208/10/0353 Institutional research plan: CEZ:AV0Z40500505 Keywords : double hydrophilic block copolymers * polymer self-assembly * light scattering Subject RIV: CD - Macromolecular Chemistry Impact factor: 2.331, year: 2011

  20. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1998-12-31

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  1. Main-chain supramolecular block copolymers.

    Science.gov (United States)

    Yang, Si Kyung; Ambade, Ashootosh V; Weck, Marcus

    2011-01-01

    Block copolymers are key building blocks for a variety of applications ranging from electronic devices to drug delivery. The material properties of block copolymers can be tuned and potentially improved by introducing noncovalent interactions in place of covalent linkages between polymeric blocks resulting in the formation of supramolecular block copolymers. Such materials combine the microphase separation behavior inherent to block copolymers with the responsiveness of supramolecular materials thereby affording dynamic and reversible materials. This tutorial review covers recent advances in main-chain supramolecular block copolymers and describes the design principles, synthetic approaches, advantages, and potential applications.

  2. Ultrasound guided supraclavicular block.

    LENUS (Irish Health Repository)

    Hanumanthaiah, Deepak

    2013-09-01

    Ultrasound guided regional anaesthesia is becoming increasingly popular. The supraclavicular block has been transformed by ultrasound guidance into a potentially safe superficial block. We reviewed the techniques of performing supraclavicular block with special focus on ultrasound guidance.

  3. Validation of 31 of the most commonly used immunohistochemical antibodies in cytology prepared using the Cellient(®) automated cell block system.

    Science.gov (United States)

    Montgomery, Eric; Gao, Chen; de Luca, Julie; Bower, Jessie; Attwood, Kristropher; Ylagan, Lourdes

    2014-12-01

    The Cellient(®) cell block system has become available as an alternative, partially automated method to create cell blocks in cytology. We sought to show a validation method for immunohistochemical (IHC) staining on the Cellient cell block system (CCB) in comparison with the formalin fixed paraffin embedded traditional cell block (TCB). Immunohistochemical staining was performed using 31 antibodies on 38 patient samples for a total of 326 slides. Split samples were processed using both methods by following the Cellient(®) manufacturer's recommendations for the Cellient cell block (CCB) and the Histogel method for preparing the traditional cell block (TCB). Interpretation was performed by three pathologists and two cytotechnologists. Immunohistochemical stains were scored as: 0/1+ (negative) and 2/3+ (positive). Inter-rater agreement for each antibody was evaluated for CCB and TCB, as well as the intra-rater agreement between TCB and CCB between observers. Interobserver staining concordance for the TCB was obtained with statistical significance (P Cellient system are reliable and concordant with stains performed on the same split samples processed via a formalin fixed-paraffin embedded (FFPE) block. The Cellient system is a welcome adjunct to cytology work-flow by producing cell block material of sufficient quality to allow the use of routine IHC. © 2014 Wiley Periodicals, Inc.

  4. Initial Mechanical Testing of Superalloy Lattice Block Structures Conducted

    Science.gov (United States)

    Krause, David L.; Whittenberger, J. Daniel

    2002-01-01

    , which were not considered in the simplified computer models. The fatigue testing proved the value of redundancies since specimen strength was maintained even after the fracture of one or two ligaments. This ongoing test program is planned to continue through high-temperature testing. Also scheduled for testing are IN 718 lattice block panels with integral face sheets, as well as specimens cast from a higher temperature alloy. The initial testing suggests the value of this technology for large panels under low and moderate pressure loadings and for high-risk, damage-tolerant structures. Potential aeropropulsion uses for lattice blocks include turbine-engine actuated panels, exhaust nozzle flaps, and side panel structures.

  5. quality assessment of sandcrete blocks produced in adeta, kwara

    African Journals Online (AJOL)

    HOD

    This research assessed the quality of blocks produced in. Adeta, Ilorin West ... compared with the Nigerian Industrial Standards (NIS) specifications. ... to provide aesthetics to buildings and serve as control ... Cement is a construction material used in bonding with ... calculated as a percentage of the total sample weight.

  6. Addendum to Sampling and Analysis Plan (SAP) for Assessment of LANL-Derived Residual Radionuclides in Soils within Tract A-16-d for Land Conveyance and Transfer for Sewage Treatment Facility Area

    Energy Technology Data Exchange (ETDEWEB)

    Whicker, Jeffrey Jay [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gillis, Jessica Mcdonnel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Ruedig, Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-21

    This report summarizes the sampling design used, associated statistical assumptions, as well as general guidelines for conducting post-sampling data analysis. Sampling plan components presented here include how many sampling locations to choose and where within the sampling area to collect those samples. The type of medium to sample (i.e., soil, groundwater, etc.) and how to analyze the samples (in-situ, fixed laboratory, etc.) are addressed in other sections of the sampling plan.

  7. Neutron beam applications - Polymer study and sample environment development for HANARO SANS instrument

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hong Doo [Kyunghee University, Seoul (Korea); Char, Kook Heon [Seoul National University, Seoul (Korea)

    2000-04-01

    A new SANS instrument will be installed in HANARO reactor near future and in parallel it is necessary to develop the sample environment facilities. One of the basic items is the equipment to control the sample temperature of cell block with auto-sample changer. It is required to develop a control software for this purpose. In addition, softwares of the aquisition and analysis for SANS instrument must be developed and supplied in order to function properly. PS/PI block copolymer research in NIST will provide the general understanding of SANS instrument and instrument-related valuable informations such as standard sample for SANS and know-hows of the instrument building. The following are the results of this research. a. Construction of sample cell block. b. Software to control the temperature and auto-sample changer. c. Acquisition of the SANS data analysis routine and its modification for HANARO SANS. d. PS/PI block copolymer research in NIST. e. Calibration data of NIST and HANARO SANS for comparison. 39 figs., 2 tabs. (Author)

  8. Isostatic compaction of beaker shaped bentonite blocks on the scale 1:4

    Energy Technology Data Exchange (ETDEWEB)

    Johannesson, Lars-Erik [Clay Technology AB, Lund (Sweden); Nord, Sven [Ifoe Ceramics AB, Bromoella (Sweden ); Pusch, Roland [Geodevelopment AB, Lund (Sweden); Sjoeblom, Rolf [AaF-Energikonsult AB, Stockholm (Sweden)

    2000-09-01

    The purpose of the present work is to test, on a scale of 1:4, the feasibility of manufacturing bentonite blocks by isostatic compaction for application as a buffer material in a repository for spent nuclear fuel. In order for the tests to be sensitive to any weaknesses of the method, the blocks were shaped as beakers. The scope included the following: 1. Preparation of powder: a. mixing of the bentonite and addition of water in predetermined amounts, b. sieving to remove any lumps generated; 2. Isostatic compaction: a. establishment of a separate laboratory for the handling of bentonite powder (weighing, mixing, filling, sampling and machining), b. development and design of equipment and procedures for compaction of bentonite to beaker-shaped specimens, c. compaction process operation, d. visual inspection; 3. Sampling and characterisation: a. extraction of samples from the blocks made, b. determination of water content, c. determination of density, d. determination of strain at maximum stress by means of bending tests, e. determination of tensile strength by means of bending tests, f. determination of geometries of the blocks prepared; 4. Post-treatment by means of machining: a. machining of blocks made, b. visual inspection; 5. Evaluation. The work went very smoothly. No significant obstacles or unexpected events were encountered. The conclusions are as follows: The conclusions drawn in this report from work on the (linear)scale of one to four are very relevant to the full scale. Mixing of bentonite powder as well as moistening can be carried out on a pilot scale with a good homogeneity and with maintained good quality of the press powder. The compaction of bentonite can be carried out in a similar manner to the present operation at Ifoe Ceramics AB. This implies a very efficient handling as well as a very efficient use of the time in the press which may account for a large proportion of the total cost. The blocks could readily be produced to reproducible

  9. Potential use of sewage sludge ash (SSA as a cement replacement in precast concrete blocks

    Directory of Open Access Journals (Sweden)

    Pérez-Carrión, M.

    2014-03-01

    Full Text Available The present study explored the technological feasibility of re-using sewage sludge ash (SSA as a Portland cement replacement in commercially manufactured pre cast concrete blocks. The blocks analysed were made to the guidelines laid down in Spain’s National Plan for Waste Water Treatment Plant Sludge, 2001–2006, and European Union specifications (CE marking for such products. Performance was compared in three families of blocks, with 0, 10 and 20% SSA. The findings proved that SSA is apt for pre cast concrete block manufacture and that, in addition to the economic and environmental benefits afforded, its use would improve certain of the properties of conventional block.El objetivo de esta investigación es estudiar el uso potencial de las cenizas de lodos de depuradora (CLD, como sustitución del cemento Portland en bloques de hormigón prefabricados, de forma que se pueda lograr una revalorización de este material de desecho mediante este procedimiento. La metodología utilizada en este trabajo se rige por las directrices del Plan Nacional Español de Lodos de Aguas Residuales de 2001–2006, y por las exigencias del Consejo Europeo (marcado CE, que es obligatorio para este tipo de productos. Se han utilizado dos niveles de sustitución de cemento (10% y 20%, y todos los resultados han sido referidos a las muestras control. Los resultados obtenidos muestran que es posible utilizar una sustitución parcial del cemento por CLD, en la fabricación de bloques de hormigón prefabricados, y por lo tanto, se pueden conseguir beneficios económicos y ambientales, así como la mejora de una serie de propiedades.

  10. Analgesic effect of bilateral subcostal tap block after laparoscopic cholecystectomy

    International Nuclear Information System (INIS)

    Karam, K.; Khan, B.I.

    2018-01-01

    Pain after laparoscopic cholecystectomy is mild to moderate in intensity. Several modalities are employed for achieving safe and effective postoperative analgesia, the benefits of which adds to the early recovery of the patients. As a part of multimodal analgesia, various approaches of Transversus abdominis plane (TAP) block has been used for management of parietal and incisional components of pain after laparoscopic cholecystectomy. This study was designed to compare the analgesic efficacy of two different approaches of ultrasound guided TAP block, i.e., Subcostal-TAP block technique with ultrasound guided Posterior-TAP block for post-operative pain management in patients undergoing laparoscopic cholecystectomy under general anaesthesia. Methods: In this double blinded randomized controlled study, consecutive nonprobability sampling was done and a total of 126 patients admitted for elective laparoscopic cholecystectomy fulfilling the inclusion criteria were selected. After induction of general anaesthesia, patients were randomized through draw method and received either ultrasound guided posterior TAP block with 0.375% bupivacaine (20ml volume) on each side of the abdomen or subcostal TAP block bilaterally with the same. Up to 24 hours postoperatively, static and dynamic numeric rating pain scores were assessed. Results: We found statistically significant difference in mean static pain scores over 24 hours postoperatively in subcostal TAP group, suggesting improved analgesia. However, mean dynamic postoperative pain scores were comparable between the two groups. Whereas, patients in both groups were satisfied with pain management. Conclusions: Ultrasound guided subcostal TAP block provides better postoperative analgesia as compared to the Posterior TAP block in laparoscopic cholecystectomy. Otherwise both of the approaches improve patient outcomes towards early recovery and discharge from hospital. (author)

  11. FUZZY ACCEPTANCE SAMPLING AND CHARACTERISTIC CURVES

    Directory of Open Access Journals (Sweden)

    Ebru Turano?lu

    2012-02-01

    Full Text Available Acceptance sampling is primarily used for the inspection of incoming or outgoing lots. Acceptance sampling refers to the application of specific sampling plans to a designated lot or sequence of lots. The parameters of acceptance sampling plans are sample sizes and acceptance numbers. In some cases, it may not be possible to define acceptance sampling parameters as crisp values. These parameters can be expressed by linguistic variables. The fuzzy set theory can be successfully used to cope with the vagueness in these linguistic expressions for acceptance sampling. In this paper, the main distributions of acceptance sampling plans are handled with fuzzy parameters and their acceptance probability functions are derived. Then the characteristic curves of acceptance sampling are examined under fuzziness. Illustrative examples are given.

  12. Stabilized and Block Approximate Inverse Preconditioners for Problems in Solid and Structural Mechanics

    Czech Academy of Sciences Publication Activity Database

    Benzi, M.; Kouhia, R.; Tůma, Miroslav

    2001-01-01

    Roč. 190, - (2001), s. 6533-6554 ISSN 0045-7825 R&D Projects: GA AV ČR IAA2030801; GA ČR GA201/00/0080 Institutional research plan: AV0Z1030915 Keywords : preconditioning * conjugate gradient * factorized sparse approximate inverse * block algorithms * finite elements * shells Subject RIV: BA - General Mathematics Impact factor: 0.913, year: 2001

  13. Efficient Imaging and Real-Time Display of Scanning Ion Conductance Microscopy Based on Block Compressive Sensing

    Science.gov (United States)

    Li, Gongxin; Li, Peng; Wang, Yuechao; Wang, Wenxue; Xi, Ning; Liu, Lianqing

    2014-07-01

    Scanning Ion Conductance Microscopy (SICM) is one kind of Scanning Probe Microscopies (SPMs), and it is widely used in imaging soft samples for many distinctive advantages. However, the scanning speed of SICM is much slower than other SPMs. Compressive sensing (CS) could improve scanning speed tremendously by breaking through the Shannon sampling theorem, but it still requires too much time in image reconstruction. Block compressive sensing can be applied to SICM imaging to further reduce the reconstruction time of sparse signals, and it has another unique application that it can achieve the function of image real-time display in SICM imaging. In this article, a new method of dividing blocks and a new matrix arithmetic operation were proposed to build the block compressive sensing model, and several experiments were carried out to verify the superiority of block compressive sensing in reducing imaging time and real-time display in SICM imaging.

  14. Adductor Canal Block versus Femoral Nerve Block and Quadriceps Strength

    DEFF Research Database (Denmark)

    Jæger, Pia Therese; Nielsen, Zbigniew Jerzy Koscielniak; Henningsen, Lene Marianne

    2013-01-01

    : The authors hypothesized that the adductor canal block (ACB), a predominant sensory blockade, reduces quadriceps strength compared with placebo (primary endpoint, area under the curve, 0.5-6 h), but less than the femoral nerve block (FNB; secondary endpoint). Other secondary endpoints were...

  15. Asymmetric PS-block-(PS-co-PB)-block-PS block copolymers: morphology formation and deformation behaviour

    International Nuclear Information System (INIS)

    Adhikari, Rameshwar; Huy, Trinh An; Buschnakowski, Matthias; Michler, Goerg H; Knoll, Konrad

    2004-01-01

    Morphology formation and deformation behaviour of asymmetric styrene/butadiene triblock copolymers (total polystyrene (PS) content ∼70%) consisting of PS outer blocks held apart by a styrene-co-butadiene random copolymer block (PS-co-PB) each were investigated. The techniques used were differential scanning calorimetry, transmission electron microscopy, uniaxial tensile testing and Fourier-transform infrared spectroscopy. A significant shift of the phase behaviour relative to that of a neat symmetric triblock copolymer was observed, which can be attributed to the asymmetric architecture and the presence of PS-co-PB as a soft block. The mechanical properties and the microdeformation phenomena were mainly controlled by the nature of their solid-state morphology. Independent of morphology type, the soft phase was found to deform to a significantly higher degree of orientation when compared with the hard phase

  16. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Small Nonroad Engines A Appendix A to Subpart F of Part 90 Protection of Environment...-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Selective Enforcement Auditing Pt. 90, Subpt. F, App. A Appendix A to Subpart F of Part 90—Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines...

  17. Evaluation of sampling plans to detect Cry9C protein in corn flour and meal.

    Science.gov (United States)

    Whitaker, Thomas B; Trucksess, Mary W; Giesbrecht, Francis G; Slate, Andrew B; Thomas, Francis S

    2004-01-01

    StarLink is a genetically modified corn that produces an insecticidal protein, Cry9C. Studies were conducted to determine the variability and Cry9C distribution among sample test results when Cry9C protein was estimated in a bulk lot of corn flour and meal. Emphasis was placed on measuring sampling and analytical variances associated with each step of the test procedure used to measure Cry9C in corn flour and meal. Two commercially available enzyme-linked immunosorbent assay kits were used: one for the determination of Cry9C protein concentration and the other for % StarLink seed. The sampling and analytical variances associated with each step of the Cry9C test procedures were determined for flour and meal. Variances were found to be functions of Cry9C concentration, and regression equations were developed to describe the relationships. Because of the larger particle size, sampling variability associated with cornmeal was about double that for corn flour. For cornmeal, the sampling variance accounted for 92.6% of the total testing variability. The observed sampling and analytical distributions were compared with the Normal distribution. In almost all comparisons, the null hypothesis that the Cry9C protein values were sampled from a Normal distribution could not be rejected at 95% confidence limits. The Normal distribution and the variance estimates were used to evaluate the performance of several Cry9C protein sampling plans for corn flour and meal. Operating characteristic curves were developed and used to demonstrate the effect of increasing sample size on reducing false positives (seller's risk) and false negatives (buyer's risk).

  18. Adductor canal block versus femoral nerve block for analgesia after total knee arthroplasty

    DEFF Research Database (Denmark)

    Jaeger, Pia; Zaric, Dusanka; Fomsgaard, Jonna Storm

    2013-01-01

    Femoral nerve block (FNB), a commonly used postoperative pain treatment after total knee arthroplasty (TKA), reduces quadriceps muscle strength essential for mobilization. In contrast, adductor canal block (ACB) is predominately a sensory nerve block. We hypothesized that ACB preserves quadriceps...

  19. Epidural analgesia in early labour blocks the stress response but uterine contractions remain unchanged.

    Science.gov (United States)

    Scull, T J; Hemmings, G T; Carli, F; Weeks, S K; Mazza, L; Zingg, H H

    1998-07-01

    To determine the effect of epidural analgesia on biochemical markers of stress, plasma oxytocin concentrations and frequency of uterine contractions during the first stage of labour. Nine nulliparous women, in spontaneous labour, with a singleton fetus and cervical dilatation < or = 5 cm were enrolled. Epidural bupivacaine 0.25% (range 10-14 ml) was administered and bilateral sensory blockade to ice (T8-L4) achieved. Blood samples were collected before the epidermal block and every 10 min for one hour after the block was achieved for the measurement of plasma beta-endorphin, cortical, glucose, lactate and oxytocin concentrations. No exogenous oxytocin was given. Intensity of pain was assessed at the time of the blood sampling using a 10 cm visual analogue scale (VAS). The frequency of uterine contractions was recorded for 60 min before and after the epidural block. There was a decrease in plasma beta-endorphin and cortisol concentrations after epidural block (P < 0.01). There were no changes in plasma glucose and lactate concentrations. The mean VAS for pain decreased 10 min after epidural block was achieved and remained < 2 throughout the study period (P < 0.001). Mean plasma oxytocin concentrations did not change. The frequency of uterine contractions before and after the epidural block was similar. The metabolic stress response to the pain of labour was attenuated by epidural analgesia. In contrast, plasma oxytocin concentration and frequency of uterine contractions were unaffected by the attenuation of metabolic stress response.

  20. Block That Pain!

    Science.gov (United States)

    Skip Navigation Bar Home Current Issue Past Issues Block That Pain! Past Issues / Fall 2007 Table of ... contrast, most pain relievers used for surgical procedures block activity in all types of neurons. This can ...

  1. ALARA ASSESSMENT OF SETTLER SLUDGE SAMPLING METHODS

    International Nuclear Information System (INIS)

    Nelsen, L.A.

    2009-01-01

    The purpose of this assessment is to compare underwater and above water settler sludge sampling methods to determine if the added cost for underwater sampling for the sole purpose of worker dose reductions is justified. Initial planning for sludge sampling included container, settler and knock-out-pot (KOP) sampling. Due to the significantly higher dose consequence of KOP sludge, a decision was made to sample KOP underwater to achieve worker dose reductions. Additionally, initial plans were to utilize the underwater sampling apparatus for settler sludge. Since there are no longer plans to sample KOP sludge, the decision for underwater sampling for settler sludge needs to be revisited. The present sampling plan calls for spending an estimated $2,500,000 to design and construct a new underwater sampling system (per A21 C-PL-001 RevOE). This evaluation will compare and contrast the present method of above water sampling to the underwater method that is planned by the Sludge Treatment Project (STP) and determine if settler samples can be taken using the existing sampling cart (with potentially minor modifications) while maintaining doses to workers As Low As Reasonably Achievable (ALARA) and eliminate the need for costly redesigns, testing and personnel retraining

  2. ALARA ASSESSMENT OF SETTLER SLUDGE SAMPLING METHODS

    Energy Technology Data Exchange (ETDEWEB)

    NELSEN LA

    2009-01-30

    The purpose of this assessment is to compare underwater and above water settler sludge sampling methods to determine if the added cost for underwater sampling for the sole purpose of worker dose reductions is justified. Initial planning for sludge sampling included container, settler and knock-out-pot (KOP) sampling. Due to the significantly higher dose consequence of KOP sludge, a decision was made to sample KOP underwater to achieve worker dose reductions. Additionally, initial plans were to utilize the underwater sampling apparatus for settler sludge. Since there are no longer plans to sample KOP sludge, the decision for underwater sampling for settler sludge needs to be revisited. The present sampling plan calls for spending an estimated $2,500,000 to design and construct a new underwater sampling system (per A21 C-PL-001 RevOE). This evaluation will compare and contrast the present method of above water sampling to the underwater method that is planned by the Sludge Treatment Project (STP) and determine if settler samples can be taken using the existing sampling cart (with potentially minor modifications) while maintaining doses to workers As Low As Reasonably Achievable (ALARA) and eliminate the need for costly redesigns, testing and personnel retraining.

  3. Bundle Branch Block

    Science.gov (United States)

    ... known cause. Causes can include: Left bundle branch block Heart attacks (myocardial infarction) Thickened, stiffened or weakened ... myocarditis) High blood pressure (hypertension) Right bundle branch block A heart abnormality that's present at birth (congenital) — ...

  4. Resonant soft x-ray GISAXS on block copolymer films

    Science.gov (United States)

    Wang, Cheng; Araki, T.; Watts, B.; Ade, H.; Hexemer, A.; Park, S.; Russell, T. P.; Schlotter, W. F.; Stein, G. E.; Tang, C.; Kramer, E. J.

    2008-03-01

    Ordered block copolymer thin films may have important applications in modern device fabrication. Current characterization methods such as conventional GISAXS have fixed electron density contrast that can be overwhelmed by surface scattering. However, soft x-rays have longer wavelength, energy dependent contrast and tunable penetration, making resonant GISAXS a very promising tool for probing nanostructured polymer thin films. Our preliminary investigation was performed using PS-b-P2VP block copolymer films on beam-line 5-2 SSRL, and beam-line 6.3.2 at ALS, LBNL. The contrast/sensitivity of the scattering pattern varies significantly with photon energy close to the C K-edge (˜290 eV). Also, higher order peaks are readily observed, indicating hexagonal packing structure in the sample. Comparing to the hard x-ray GISAXS data of the same system, it is clear that resonant GISAXS has richer data and better resolution. Beyond the results on the A-B diblock copolymers, results on ABC block copolymers are especially interesting.

  5. Gulf of Mexico Sales 142 and 143: Central and western planning areas

    International Nuclear Information System (INIS)

    1992-11-01

    This environmental impact statement (EIS) addresses two proposed Federal actions, lease Sales 142 and 143, that will offer for lease Gulf of Mexico Outer Continental Shelf (OCS) areas that may contain economically recoverable oil and gas resources. The lease sales are proposed for 1993 and include lease blocks in the Central Gulf of Mexico Planning Area (CPA) and Western Gulf of Mexico Planning Area (WPA). Up to 10,099 blocks will be available for lease under the two proposed actions; only a small percentage is expected to be actually leased. On average, 401 blocks in the Central Gulf and 264 blocks in the Western Gulf have been leased in individual Gulf of Mexico OCS lease sales since 1984. Of the blocks that will be leased as a result of the two proposed actions, only a portion will be drilled and result in subsequent production. The scoping process was used to obtain information and comments on the proposed actions and the potential environmental effects from diverse interests, including the affected States, Federal agencies, the petroleum industry, environmental and public interest groups, and concerned individuals. The input from these sources aided in the identification of significant issues, possible alternatives to the proposed actions, and potential mitigating measures

  6. A randomized trial comparing surgeon-administered intraoperative transversus abdominis plane block with anesthesiologist-administered transcutaneous block.

    Science.gov (United States)

    Narasimhulu, D M; Scharfman, L; Minkoff, H; George, B; Homel, P; Tyagaraj, K

    2018-04-27

    Injection of local anesthetic into the transversus abdominis plane (TAP block) decreases systemic morphine requirements after abdominal surgery. We compared intraoperative surgeon-administered TAP block (surgical TAP) to anesthesiologist-administered transcutaneous ultrasound-guided TAP block (conventional TAP) for post-cesarean analgesia. We hypothesized that surgical TAP blocks would take less time to perform than conventional TAP blocks. We performed a randomized trial, recruiting 41 women undergoing cesarean delivery under neuraxial anesthesia, assigning them to either surgical TAP block (n=20) or conventional TAP block (n=21). Time taken to perform the block was the primary outcome, while postoperative pain scores and 24-hour opioid requirements were secondary outcomes. Student's t-test was used to compare block time and Kruskal-Wallis test opioid consumption and pain-scores. Time taken to perform the block (2.4 vs 12.1 min, P consumption (P=0.17) and postoperative pain scores at 4, 8, 24 and 48 h were not significantly different between the groups. Surgical TAP blocks are feasible and less time consuming than conventional TAP blocks, while providing comparable analgesia after cesarean delivery. Copyright © 2018 Elsevier Ltd. All rights reserved.

  7. Comparison of efficacy of transversus abdominis plane block and iliohypogastric/ilioinguinal nerve block for postoperative pain management in patients undergoing inguinal herniorrhaphy with spinal anesthesia: a prospective randomized controlled open-label study.

    Science.gov (United States)

    Okur, Onur; Tekgul, Zeki Tuncel; Erkan, Nazif

    2017-10-01

    The purpose of this study was to compare the effects of lateral abdominal transversus abdominis plane block (TAP block) and iliohypogastric/ilioinguinal nerve block (IHINB) under ultrasound guidance for postoperative pain management of inguinal hernia repair. Secondary purposes were to compare the complication rates of the two techniques and to examine the effects of TAP block and IHINB on chronic postoperative pain. This was a prospective randomized controlled open-label study. After approval of the Research Ethics Board, a total of 90 patients were allocated to three groups of 30 by simple randomized sampling as determined with a priori power analysis. Peripheral nerve blocks (TAP block or IHINB) were administered to patients following subarachnoid block according to their allocated group. Patient pain scores, additional analgesic requirements and complication rates were recorded periodically and compared. Pain scores were significantly lower in the study groups (p block group [GT] 266.6 ± 119.7 min; IHINB group [GI] 247.2 ± 128.7 min; and control group [GC] 79.1 ± 66.2 min; p block or IHINB for patients undergoing inguinal herniorrhaphy reduces the intensity of both acute and chronic postoperative pain and additional analgesic requirements.

  8. Influence of blocking on Northern European and Western Russian heatwaves in large climate model ensembles

    Science.gov (United States)

    Schaller, N.; Sillmann, J.; Anstey, J.; Fischer, E. M.; Grams, C. M.; Russo, S.

    2018-05-01

    Better preparedness for summer heatwaves could mitigate their adverse effects on society. This can potentially be attained through an increased understanding of the relationship between heatwaves and one of their main dynamical drivers, atmospheric blocking. In the 1979–2015 period, we find that there is a significant correlation between summer heatwave magnitudes and the number of days influenced by atmospheric blocking in Northern Europe and Western Russia. Using three large global climate model ensembles, we find similar correlations, indicating that these three models are able to represent the relationship between extreme temperature and atmospheric blocking, despite having biases in their simulation of individual climate variables such as temperature or geopotential height. Our results emphasize the need to use large ensembles of different global climate models as single realizations do not always capture this relationship. The three large ensembles further suggest that the relationship between summer heatwaves and atmospheric blocking will not change in the future. This could be used to statistically model heatwaves with atmospheric blocking as a covariate and aid decision-makers in planning disaster risk reduction and adaptation to climate change.

  9. Assessment of groundwater quality in Kashipur Block, Purulia district, West Bengal

    Science.gov (United States)

    Kundu, Anindita; Nag, S. K.

    2018-03-01

    Hydrogeochemical investigation of groundwater resources of Kashipur Block, Purulia district, West Bengal has been carried out to assess the water quality for domestic and irrigation uses. Twenty groundwater samples were collected and analyzed for pH, electrical conductivity, total dissolved solids, hardness, major anions (CO3 2-, HCO3 -, Cl-, SO4 2-, F-) and cations (Ca2+, Mg2+, Fe2+, Na+, K+). Study results reveal that the groundwater of the area is mostly acidic in nature. The trend amongst average ionic concentrations of cations and anions is Mg2+ > Ca2+ > Na+ > Fe2+ > K+ and Cl- > HCO3 - > CO3 2- > SO4 2- > F- respectively during the post monsoon whereas the trend for cations and anions are Mg2+ > Ca2+> Na+ > K+ > Fe and Cl- > HCO3 - > SO4 2- > F- > CO3 - in pre monsoon session, respectively. To explore the ionic toxicity of the study area, the derived parameters like sodium adsorption ratio, soluble sodium percentage, residual sodium carbonate, magnesium adsorption ratio, Kelly's ratio and permeability index were calculated. The hydro geochemical data suggest that weathering of rock forming minerals along with secondary contributions from agricultural and anthropogenic sources are mainly controlling the groundwater composition of Kashipur Block, Purulia District. According to piper diagram, water samples of most of the area of the block are fresh water and in some areas sulphate rich throughout the year. All samples are distributed to central rock dominance category. Groundwater chemistry of this block is mainly controlled by the interaction existing between the litho units and the percolating water into the subsurface domain. However, the groundwater quality and suitability of this study area can be termed as good to moderate with a few exceptions which have been encountered on a local scale.

  10. Multiblock variance partitioning: A new approach for comparing variation in multiple data blocks

    Energy Technology Data Exchange (ETDEWEB)

    Skov, Thomas [Quality and Technology, Department of Food Science, Faculty of Life Sciences, University of Copenhagen, Rolighedsvej 30, DK-1958 Frederiksberg C (Denmark)], E-mail: thsk@life.ku.dk; Ballabio, Davide [Milano Chemometrics and QSAR Research Group, Department of Environmental Sciences, University of Milano-Bicocca, P.za della Scienza, 1-20126 Milano (Italy); Bro, Rasmus [Quality and Technology, Department of Food Science, Faculty of Life Sciences, University of Copenhagen, Rolighedsvej 30, DK-1958 Frederiksberg C (Denmark)

    2008-05-12

    More than one multi-informative analytical technique is often applied when describing the condition of a set of samples. Often a part of the information found in these data blocks is redundant and can be extracted from more blocks. This study puts forward a method (multiblock variance partitioning-MVP) to compare the information/variation in different data blocks using simple quantitative measures. These measures are the unique part of the variation only found in one data block and the common part that can be found in more data blocks. These different parts are found using PLS models between predictor blocks and a common response. MVP provides a different view on the information in different blocks than normal multiblock analysis. It will be shown that this has many applications in very diverse fields such as process control, assessor performance in sensory analysis, efficiency of preprocessing methods and as complementary information to an interval PLS analysis. Here the ideas of the MVP approach are presented in detail using a study of red wines from different regions measured with GC-MS and FT-IR instruments providing different kinds of data representations.

  11. Thinking Outside the Block: An Innovative Alternative to 4X4 Block Scheduling.

    Science.gov (United States)

    Frank, Myra

    2002-01-01

    Introduces a 4x1 block scheduling method that was developed as an alternative to 4x4 block scheduling. Schedules Fridays for summer school, test preparation, and enrichment and elective courses. Includes suggestions on how to alleviate drawbacks of the 4x1 block schedule. (YDS)

  12. Distribution of short block copolymer chains in Binary Blends of Block Copolymers Having Hydrogen Bonding

    Science.gov (United States)

    Kwak, Jongheon; Han, Sunghyun; Kim, Jin Kon

    2014-03-01

    A binary mixture of two block copolymers whose blocks are capable of forming the hydrogen bonding allows one to obtain various microdomains that could not be expected for neat block copolymer. For instance, the binary blend of symmetric polystyrene-block-poly(2-vinylpyridine) copolymer (PS-b-P2VP) and polystyrene-block-polyhydroxystyrene copolymer (PS-b-PHS) blends where the hydrogen bonding occurred between P2VP and PHS showed hexagonally packed (HEX) cylindrical and body centered cubic (BCC) spherical microdomains. To know the exact location of short block copolymer chains at the interface, we synthesized deuterated polystyrene-block-polyhydroxystyrene copolymer (dPS-b-PHS) and prepared a binary mixture with PS-b-P2VP. We investigate, via small angle X-ray scattering (SAXS) and neutron reflectivity (NR), the exact location of shorter dPS block chain near the interface of the microdomains.

  13. Minimum Description Length Block Finder, a Method to Identify Haplotype Blocks and to Compare the Strength of Block Boundaries

    OpenAIRE

    Mannila, H.; Koivisto, M.; Perola, M.; Varilo, T.; Hennah, W.; Ekelund, J.; Lukk, M.; Peltonen, L.; Ukkonen, E.

    2003-01-01

    We describe a new probabilistic method for finding haplotype blocks that is based on the use of the minimum description length (MDL) principle. We give a rigorous definition of the quality of a segmentation of a genomic region into blocks and describe a dynamic programming algorithm for finding the optimal segmentation with respect to this measure. We also describe a method for finding the probability of a block boundary for each pair of adjacent markers: this gives a tool for evaluating the ...

  14. Whole arm manipulation planning based on feedback velocity fields and sampling-based techniques.

    Science.gov (United States)

    Talaei, B; Abdollahi, F; Talebi, H A; Omidi Karkani, E

    2013-09-01

    Changing the configuration of a cooperative whole arm manipulator is not easy while enclosing an object. This difficulty is mainly because of risk of jamming caused by kinematic constraints. To reduce this risk, this paper proposes a feedback manipulation planning algorithm that takes grasp kinematics into account. The idea is based on a vector field that imposes perturbation in object motion inducing directions when the movement is considerably along manipulator redundant directions. Obstacle avoidance problem is then considered by combining the algorithm with sampling-based techniques. As experimental results confirm, the proposed algorithm is effective in avoiding jamming as well as obstacles for a 6-DOF dual arm whole arm manipulator. Copyright © 2013 ISA. Published by Elsevier Ltd. All rights reserved.

  15. Engineering task plan for upgrades to the leveling jacks on core sample trucks number 3 and 4; TOPICAL

    International Nuclear Information System (INIS)

    KOSTELNIK, A.J.

    1999-01-01

    Characterizing the waste in underground storage tanks at the Hanford Site is accomplished by obtaining a representative core sample for analysis. Core sampling is one of the numerous techniques that have been developed for use given the environmental and field conditions at the Hanford Site. Core sampling is currently accomplished using either Push Mode Core Sample Truck No.1 or; Rotary Mode Core Sample Trucks No.2, 3 or 4. Past analysis (WHC 1994) has indicated that the Core Sample Truck (CST) leveling jacks are structurally inadequate when lateral loads are applied. WHC 1994 identifies many areas where failure could occur. All these failures are based on exceeding the allowable stresses listed in the American Institute of Steel Construction (AISC) code. The mode of failure is for the outrigger attachments to the truck frame to fail resulting in dropping of the CST and possible overturning (Ref. Ziada and Hundal, 1996). Out of level deployment of the truck can exceed the code allowable stresses in the structure. Calculations have been performed to establish limits for maintaining the truck level when lifting. The calculations and the associated limits are included in appendix A. The need for future operations of the CSTS is limited. Sampling is expected to be complete in FY-2001. Since there is limited time at risk for continued use of the CSTS with the leveling controls without correcting the structural problems, there are several design changes that could give incremental improvements to the operational safety of the CSTS with limited impact on available operating time. The improvements focus on making the truck easier to control during lifting and leveling. Not all of the tasks identified in this ETP need to be performed. Each task alone can improve the safety. This engineering task plan is the management plan document for implementing the necessary additional structural analysis. Any additional changes to meet requirements of standing orders shall require a

  16. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  17. Y-12 Plant Groundwater Protection Program: Groundwater and surface water sampling and analysis plan for Calendar Year 1998

    International Nuclear Information System (INIS)

    1997-09-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 1998 at the Department of Energy (DOE) Y-12 Plant. These monitoring activities are managed by the Y-12 Plant Environmental Compliance Organization through the Y-12 Plant Groundwater Protection Program (GWPP). Groundwater and surface water monitoring during CY 1998 will be performed in three hydrogeologic regimes at the Y-12 Plant: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located within Bear Creek Valley, and the Chestnut Ridge Regime is located south of the Y-12 Plant. Groundwater and surface water monitoring will be performed during CY 1998 to comply with: (1) requirements specified in Resource Conservation and Recover Act (RCRA) post-closure permits regarding RCRA corrective action monitoring and RCRA detection monitoring; (2) Tennessee Department of Environment and Conservation regulations governing detection monitoring at nonhazardous solid waste management facilities; and (3) DOE Order 5400.1 surveillance monitoring and exit pathway monitoring. Data from some of the sampling locations in each regime will be used to meet the requirements of more than one of the monitoring drivers listed above. Modifications to the CY 1998 monitoring program may be necessary during implementation. For example, changes in regulatory requirements may alter the parameters specified for selected monitoring wells, or wells could be removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 Plant GWPP manager and documented as addenda to this sampling and analysis plan

  18. 78 FR 22257 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Science.gov (United States)

    2013-04-15

    ... Blocking Agent in Radiation Emergencies, FDA (66 FR 64046, Dec. 11, 2001). Provide basic planning guidance... decision making. Chapter 4--Late Phase: A brief planning guidance on the cleanup process is included... PAG Manual. Basic planning guidance on approaching radioactive waste disposal is included. Please...

  19. Spatial variability of groundwater quality of Sabour block, Bhagalpur district (Bihar, India)

    Science.gov (United States)

    Verma, D. K.; Bhunia, Gouri Sankar; Shit, Pravat Kumar; Kumar, S.; Mandal, Jajati; Padbhushan, Rajeev

    2017-07-01

    This paper examines the quality of groundwater of Sabour block, Bhagalpur district of Bihar state, which lies on the southern region of Indo-Gangetic plains in India. Fifty-nine samples from different sources of water in the block have been collected to determine its suitability for drinking and irrigational purposes. From the samples electrical conductivity (EC), pH and concentrations of Calcium (Ca2+), Magnesium (Mg2+), Sodium (Na+), Potassium (K+), carbonate ion (CO 3 2- ), Bicarbonate ion (HCO 3 - ), Chloride ion (Cl-), and Fluoride (F-) were determined. Surface maps of all the groundwater quality parameters have been prepared using radial basis function (RBF) method. RBF model was used to interpolate data points in a group of multi-dimensional space. Root Mean Square Error (RMSE) is employed to scrutinize the best fit of the model to compare the obtained value. The mean value of pH, EC, Ca2+, Mg2+, Na+, K+, HCO3 -, Cl-, and F- are found to be 7.26, 0.69, 38.98, 34.20, 16.92, 1.19, 0.02, and 0.28, respectively. Distribution of calcium concentration is increasing to the eastern part and K+ concentrations raise to the downstream area in the southwestern part. Low pH concentrations (less than 6.71) occur in eastern part of the block. Spatial variations of hardness in Sabour block portraying maximum concentration in the western part and maximum SAR (more than 4.23) were recorded in the southern part. These results are not exceeding for drinking and irrigation uses recommended by World Health Organization. Therefore, the majority of groundwater samples are found to be safe for drinking and irrigation management practices.

  20. Preconception health: awareness, planning, and communication among a sample of US men and women.

    Science.gov (United States)

    Mitchell, Elizabeth W; Levis, Denise M; Prue, Christine E

    2012-01-01

    It is important to educate both men and women about preconception health (PCH), but limited research exists in this area. This paper examines men's and women's awareness of exposure to PCH information and of specific PCH behaviors, PCH planning, and PCH discussions with their partners. Data from Porter Novelli's 2007 Healthstyles survey were used. Women and men of reproductive age were included in the analysis (n = 2,736) to understand their awareness, planning, and conversations around PCH. Only 27.9% of women and men reported consistently using an effective birth control method. The majority of men (52%) and women (43%) were unaware of any exposure to PCH messages; few received information from their health care provider. Women were more aware than men of specific pre-pregnancy health behaviors. Women in the sample reported having more PCH conversations with their partners than did men. PCH education should focus on both women and men. Communication about PCH is lacking, both between couples and among men and women and their health care providers. PCH education might benefit from brand development so that consumers know what to ask for and providers know what to deliver.

  1. Sampling and analysis plan for phase II of the Bear Creek Valley treatability study Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    The Bear Creek Valley (BCV) Treatability Study is intended to provide site-specific data defining potential treatment technologies applicable to contaminated groundwater and surface water. This project directly supports Alternative 5 of the base action in the BCV Feasibility Study, and indirectly supports other alternatives through proof of concept. In that role, the ultimate goal is to install a treatment system that will remove uranium and nitrate from groundwater before it reaches Bear Creek. A secondary goal is the concurrent removal of technetium and several metals that impact ecological risk. This project is intended to produce hydraulic and treatment performance data required to design the treatment system to reach those goals. This project will also generate information that can be applied at other facilities within the Oak Ridge Reservation. This report is the sampling and analysis plan (SAP) for the field work component of Phase II of the BCV Treatability Study. Field work for this phase of the BCV Treatability Study consists of media testing. In-field continuous flow tests will be conducted over an extended time period (5 weeks) to generate data on long-term treatment effects on potential treatment media including sorbents and zero valent iron, over 28 weeks for constructed wetlands treatment, and over 24 weeks for algal mats treatment. The SAP addresses environmental sampling at the S-3 Site at the Oak Ridge Y-12 Plant. Samples will be taken from groundwater, effluent from test columns, effluent from an algal mat reactor, and effluent from a pilot-scale wetlands. This plan will be implemented as part of the BCV Phase II Treatability Study Best Management Practices Plan and in conjunction with the BCV Phase II Treatability Study Health and Safety Plan and the BCV Phase II Treatability Study Waste Management Plan

  2. Sampling and analysis plan for the characterization of eight drums at the 200-BP-5 pump-and-treat systems

    International Nuclear Information System (INIS)

    Laws, J.R.

    1995-01-01

    Samples will be collected and analyzed to provide sufficient information for characterization of mercury and aluminum contamination in drums from the final rinse of the tanks in the two pump-and-treat systems supporting the 200-BP-5 Operable Unit. The data will be used to determine the type of contamination in the drums to properly designate the waste for disposal or treatment. This sampling plan does not substitute the sampling requirements but is a separate sampling event to manage eight drums containing waste generated during an unanticipated contamination of the process water with mercury and aluminum nitrate nonahydrate (ANN). The Toxicity Characteristic Leaching Procedure (TCLP) will be used for extraction, and standard US Environmental Protection Agency (EPA) methods will be used for analysis

  3. Sampling and analysis plan for sludge located on the floor and in the pits of the 105-K basins

    International Nuclear Information System (INIS)

    BAKER, R.B.

    1998-01-01

    This Sampling and Analysis Plan (SAP) provides direction for the sampling of the sludge found on the floor and in the remote pits of the 105-K Basins to provide: (1) basic data for the sludges that have not been characterized to-date and (2) representative Sludge material for process tests to be made by the SNF Project/K Basins sludge treatment process subproject. The sampling equipment developed will remove representative samples of the radioactive sludge from underwater at the K Basins, depositing them in shielded containers for transport to the Hanford Site laboratories. Included in the present document is the basic background logic for selection of the samples to meet the requirements established in the Data Quality Objectives (DQO), HNF-2033, for this sampling activity. The present document also includes the laboratory analyses, methods, procedures, and reporting that will be required to meet the DQO

  4. Planning with Reachable Distances

    KAUST Repository

    Tang, Xinyu

    2009-01-01

    Motion planning for spatially constrained robots is difficult due to additional constraints placed on the robot, such as closure constraints for closed chains or requirements on end effector placement for articulated linkages. It is usually computationally too expensive to apply sampling-based planners to these problems since it is difficult to generate valid configurations. We overcome this challenge by redefining the robot\\'s degrees of freedom and constraints into a new set of parameters, called reachable distance space (RD-space), in which all configurations lie in the set of constraint-satisfying subspaces. This enables us to directly sample the constrained subspaces with complexity linear in the robot\\'s number of degrees of freedom. In addition to supporting efficient sampling, we show that the RD-space formulation naturally supports planning, and in particular, we design a local planner suitable for use by sampling-based planners. We demonstrate the effectiveness and efficiency of our approach for several systems including closed chain planning with multiple loops, restricted end effector sampling, and on-line planning for drawing/sculpting. We can sample single-loop closed chain systems with 1000 links in time comparable to open chain sampling, and we can generate samples for 1000-link multi-loop systems of varying topology in less than a second. © 2009 Springer-Verlag.

  5. Paroxysmal atrioventricular block: Electrophysiological mechanism of phase 4 conduction block in the His-Purkinje system: A comparison with phase 3 block.

    Science.gov (United States)

    Shenasa, Mohammad; Josephson, Mark E; Wit, Andrew L

    2017-11-01

    Paroxysmal atrioventricular (A-V) block is relatively rare, and due to its transient nature, it is often under recognized. It is often triggered by atrial, junctional, or ventricular premature beats, and occurs in the presence of a diseased His-Purkinje system (HPS). Here, we present a 45-year-old white male who was admitted for observation due to recurrent syncope and near-syncope, who had paroxysmal A-V block. The likely cellular electrophysiological mechanisms(s) of paroxysmal A-V block and its differential diagnosis and management are discussed. Continuous electrocardiographic monitoring was done while the patient was in the cardiac unit. Multiple episodes of paroxysmal A-V block were documented in this case. All episodes were initiated and terminated with atrial/junctional premature beats. The patient underwent permanent pacemaker implantation and has remained asymptomatic since then. Paroxysmal A-V block is rare and often causes syncope or near-syncope. Permanent pacemaker implantation is indicated according to the current guidelines. Paroxysmal A-V block occurs in the setting of diseased HPS and is bradycardia-dependent. The detailed electrophysiological mechanisms, which involve phase 4 diastolic depolarization, and differential diagnosis are discussed. © 2017 Wiley Periodicals, Inc.

  6. Estimation of americium in cemented waste block using gamma ray spectrometry

    International Nuclear Information System (INIS)

    Singh, Sarbjit; Mhatre, Amol; Sagar, Veena

    2012-05-01

    A method was developed for the estimation of 241 Am present in the cemented waste block which was cylindrical in shape. In such large sample, the attenuation of gamma rays increases with size of the sample and density of the material present. Attenuation correction was incorporated using linear attenuation coefficients of 59.54 keV gamma ray of 241 Am. Also in such large samples, error due to the distribution of activity is more. Estimation of 241 Am in the cemented sample was carried out by applying corrections for attenuation and for the sample geometry. (author)

  7. Improving the nutritive value of the blocks using gamma irradiation treatment

    International Nuclear Information System (INIS)

    Al-Masri, M. R.

    1993-09-01

    The effects of 100 KGy of gamma irradiation on dry matter and organic matter digestibility determined in vitro to improve the nutritive value of three types of blocks containing different feed stuffs were investigated. The compositions of the blocks were type I (wheat bran 28%, dried poultry manure 31%, molasses 20%, urea 10%, Ca(OH)2 6%, salt 5%). Type II (wheat bran 22%, dried poultry manure 10%, sugarbeet 30%, molasses 20%, urea 8%, Ca(OH)2 6%, salt 4%). Type III (olive-oil cake 35%. Wheat bran 30%, urea 100%, cement 15%, salt 10%). The results indicate that there was a significant difference (0.05) between the treated samples and the control for NDF, dry matter and organic matter digestibility. Gamma irradiation resulted in a significant increase (P<0.05) in dry matter and organic matter digestibility and a significant decrease (P<0.05) in NDF contents for the three types of feed blocks. Dry matter digestibility increased by 5% for all block types whereas organic matter digestibility increased by 7%, and 10% for block types I, II and III respectively. The increase in organic matter digestibility was probably due to a decrease in NDF content resulting from gamma irradiation. NDF decreased by 25%, 19% and 16% for block types I, II and III respectively. (author). 23 refs., 4 figs., 2 tabs

  8. Designers Block 2002

    DEFF Research Database (Denmark)

    Dickson, Thomas

    2002-01-01

    Artiklen indleder med: ved siden aaf Londons etablerede designmesse '100% Design', er der vokset et undergrundsmiljø af designudstillinger op. Det dominerende og mest kendte initiativ er Designers Block, der i år udstillede to steder i byen. Designers Block er et mere uformelt udstillingsforum...

  9. Comparison of three cell block techniques for detection of low frequency abnormal cells

    OpenAIRE

    McCormack M; Hecht SA

    2013-01-01

    Steven A Hecht, Matthew McCormackHologic Inc, Marlborough, MA, USABackground: The Cellient® Automated Cell Block System rapidly creates paraffin-embedded cell blocks by using vacuum filtration to deposit a layer of cells on a filter and infiltrate those cells with reagents and paraffin. This study used a “tracer” cell model to mimic low frequency abnormal cells and compare detection and representative sampling with simple sedimentation, Richard-Allan HistoGel&t...

  10. On the interaction of the morphological structure and the LC behaviour of LC side chain block copolymers

    NARCIS (Netherlands)

    Fischer, H.R.; Poser, S.; Arnold, M.

    1995-01-01

    The interaction between morphological structure and phase behaviour of a LC side group block copolymer has been investigated using DSC, TEM and small angle X-ray diffraction. All samples of Polystyrene-block-2-(3-cholesteryloxycarbonyloxy)ethyl methacrylate (PS-b-PChEMA) show a phase separation

  11. MANU. Isostatic compression of buffer blocks. Small scale

    International Nuclear Information System (INIS)

    Laaksonen, R.

    2010-01-01

    The purpose of this study was to become familiar with the isostatic compression technique and to manufacture specimens to study various aspects of the manufacturing process. These included for example the effect of moisture, maximum compressive pressure, vibration, vacuum, specimen size, coating, multiple compressions and duration of load cycle on the density and other properties of bentonite specimens. Also the amount of volumetric contraction was of interest in this study together with the used mould technology. This work summarizes the tests done with isostatic compression technique during 2008. Tests were mainly carried out with MX-80 bentonite, which is a commercial product and currently the reference bentonite in the repository reference plan. Tests were made from June to November 2008 both in Finland and in Sweden. VTT made four test series in Finland. MABU Consulting Ab made two test series in Sweden. Also Posiva Oy carried out one preliminary series before this study in Finland. The test results show that there is a clear relationship between density and moisture content at all pressure levels. The calculated degree of saturation of more moist samples remained at the level of 95 -to 98 % of full saturation. It should be possible to manufacture buffer blocks with high accuracy (density, water content, degree of saturation), if similar preliminary tests are done. Tests did not support the assumption that vacuum (partial or full) in the specimen during compression increases the final density. Tests showed that pre-vibrated specimens had a slightly higher density but the difference was insignificant. Coarse raw bentonite produced the highest dry density of all sodium bentonites used. The highest dry density values were received with Minelco's Ca-bentonite, but the average water content was not extremely accurate. The following recommendations were derived from the results of this project: additional tests should be carried out to determine the relationship

  12. Sampling-Based Motion Planning Algorithms for Replanning and Spatial Load Balancing

    Energy Technology Data Exchange (ETDEWEB)

    Boardman, Beth Leigh [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-12

    The common theme of this dissertation is sampling-based motion planning with the two key contributions being in the area of replanning and spatial load balancing for robotic systems. Here, we begin by recalling two sampling-based motion planners: the asymptotically optimal rapidly-exploring random tree (RRT*), and the asymptotically optimal probabilistic roadmap (PRM*). We also provide a brief background on collision cones and the Distributed Reactive Collision Avoidance (DRCA) algorithm. The next four chapters detail novel contributions for motion replanning in environments with unexpected static obstacles, for multi-agent collision avoidance, and spatial load balancing. First, we show improved performance of the RRT* when using the proposed Grandparent-Connection (GP) or Focused-Refinement (FR) algorithms. Next, the Goal Tree algorithm for replanning with unexpected static obstacles is detailed and proven to be asymptotically optimal. A multi-agent collision avoidance problem in obstacle environments is approached via the RRT*, leading to the novel Sampling-Based Collision Avoidance (SBCA) algorithm. The SBCA algorithm is proven to guarantee collision free trajectories for all of the agents, even when subject to uncertainties in the knowledge of the other agents’ positions and velocities. Given that a solution exists, we prove that livelocks and deadlock will lead to the cost to the goal being decreased. We introduce a new deconfliction maneuver that decreases the cost-to-come at each step. This new maneuver removes the possibility of livelocks and allows a result to be formed that proves convergence to the goal configurations. Finally, we present a limited range Graph-based Spatial Load Balancing (GSLB) algorithm which fairly divides a non-convex space among multiple agents that are subject to differential constraints and have a limited travel distance. The GSLB is proven to converge to a solution when maximizing the area covered by the agents. The analysis

  13. Soil sampling and analysis plan for the Bear Creek Valley Floodplain at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Sampling and Analysis Plan (SAP) for the Bear Creek Valley (BCV) Floodplain presents the approach and rationale for characterizing potentially contaminated soils and sediments of the Bear Creek floodplain and the impact of any contaminants on the floodplain ecosystem. In addition to this SAP, the Remedial Investigation Work Plan for Bear Creek (Y02-S600) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (ES/ER-19&D2) presents background information pertaining to this floodplain investigation.

  14. Soil sampling and analysis plan for the Bear Creek Valley Floodplain at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-03-01

    This Sampling and Analysis Plan (SAP) for the Bear Creek Valley (BCV) Floodplain presents the approach and rationale for characterizing potentially contaminated soils and sediments of the Bear Creek floodplain and the impact of any contaminants on the floodplain ecosystem. In addition to this SAP, the Remedial Investigation Work Plan for Bear Creek (Y02-S600) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (ES/ER-19 ampersand D2) presents background information pertaining to this floodplain investigation

  15. Anionic polymerization of acrylates. XIV. Synthesis of MMA/acrylate block copolymers initiated with ester-enolate/tert-alkoxide complex

    Czech Academy of Sciences Publication Activity Database

    Vlček, Petr; Čadová, Eva; Kříž, Jaroslav; Látalová, Petra; Janata, Miroslav; Toman, Luděk; Masař, Bohumil

    2005-01-01

    Roč. 46, č. 14 (2005), s. 4991-5000 ISSN 0032-3861 Institutional research plan: CEZ:AV0Z4050913 Keywords : ligated anionic polymerization * (meth)acrylates * block copolymers Subject RIV: CD - Macromolecular Chemistry Impact factor: 2.849, year: 2005

  16. FORC analysis of Ni(SiO{sub 2}) nanogranular film in the blocked regime

    Energy Technology Data Exchange (ETDEWEB)

    Lavin, R. [Departamento de Fisica, Universidad de Santiago de Chile, USACH, Av. Ecuador 3493, Santiago (Chile); Facultad de Ingenieria, Universidad Diego Portales, UDP, Ejercito 441, Santiago (Chile); Farias, C. [Facultad de Ingenieria, Universidad Diego Portales, UDP, Ejercito 441, Santiago (Chile); Denardin, J.C., E-mail: juliano.denardin@usach.cl [Departamento de Fisica, Universidad de Santiago de Chile, USACH, Av. Ecuador 3493, Santiago (Chile); Centro para el Desarrollo de la Nanociencia y la Nanotecnologia, CEDENNA, Av. Ecuador 3493, Santiago (Chile)

    2012-05-15

    In this work the magnetic and structural properties of granular Ni(SiO{sub 2}) films are studied by means of FORCs diagrams and microscopy. Transmission electron microscopy images show that the sample is composed of a fine dispersion of Ni nanoparticles with 3.7 nm in average sizes. Magnetic measurements as function of temperature show that the nanoparticles are superparamagnetic at room temperature and are blocked at 5 K. The FORCs diagrams obtained below the blocking temperature allow us to determine the average size of the nanoparticles and the distribution of sizes in a very good agreement with TEM images. - Highlights: Black-Right-Pointing-Pointer FORC study of Ni nanoparticles in the blocked regime. Black-Right-Pointing-Pointer The sample is composed of Ni nanoparticles with 3.7 nm in average size. Black-Right-Pointing-Pointer The dispersion of sizes of nanoparticles is wide. Black-Right-Pointing-Pointer FORC diagrams show a distribution of coercivity consistent with the distribution of sizes.

  17. Current situation of the project of 3. and 4. block of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Suchy, L.

    2006-01-01

    The contribution shows the basic information about the crucial milestone of 3. building and the current situation of the project of 3. and 4. block of the nuclear power plant Mochovce. Contribution also shows what activities were realized and what material in area of designation of the technical and safety standard of the project was elaborated in the past, the main activities planned for 2006 have been described, support for Feasibility Study elaborated by ENEL and description of the integrated management system. The basic thesis crucial for the next steps on the project of 3. and 4. block of Nuclear Power Plant Mochovce is presented in the conclusion

  18. Defense Resource Management Studies: Introduction to Capability and Acquisition Planning Processes

    Science.gov (United States)

    2010-08-01

    Evaluation Plans ( BEPs ) Establishes how the MoD approved, procurement action will proceed – Dates for requesting and receiving bids – Evaluation period...Proposed Bid and Evaluation Plan ( BEP ) Next chart highlights the intended process and products Flag Button BLOCK 6 8 Intended Process and Products...Funding Level and Source  Circular of Requirements (COR) with Key Performance Parameters (KPPs)  Bid and Evaluation Plan ( BEP ) A B C D E D1 D2 D3

  19. The Route Analysis Based On Flight Plan

    Science.gov (United States)

    Feriyanto, Nur; Saleh, Chairul; Fauzi, Achmad; Rachman Dzakiyullah, Nur; Riza Iwaputra, Kahfi

    2016-02-01

    Economic development effects use of air transportation since the business process in every aspect was increased. Many people these days was prefer using airplane because it can save time and money. This situation also effects flight routes, many airlines offer new routes to deal with competition. Managing flight routes is one of the problems that must be faced in order to find the efficient and effective routes. This paper investigates the best routes based on flight performance by determining the amount of block fuel for the Jakarta-Denpasar flight route. Moreover, in this work compares a two kinds of aircraft and tracks by calculating flight distance, flight time and block fuel. The result shows Jakarta-Denpasar in the Track II has effective and efficient block fuel that can be performed by Airbus 320-200 aircraft. This study can contribute to practice in making an effective decision, especially helping executive management of company due to selecting appropriate aircraft and the track in the flight plan based on the block fuel consumption for business operation.

  20. ANALYSIS OF EXISTING AND PROSPECTIVE TECHNICAL CONTROL SYSTEMS OF NUMERIC CODES AUTOMATIC BLOCKING

    Directory of Open Access Journals (Sweden)

    A. M. Beznarytnyy

    2013-09-01

    Full Text Available Purpose. To identify the characteristic features of the engineering control measures system of automatic block of numeric code, identifying their advantages and disadvantages, to analyze the possibility of their use in the problems of diagnosing status of the devices automatic block and setting targets for the development of new diagnostic systems. Methodology. In order to achieve targets the objective theoretical and analytical method and the method of functional analysis have been used. Findings. The analysis of existing and future facilities of the remote control and diagnostics automatic block devices had shown that the existing systems of diagnosis were not sufficiently informative, designed primarily to control the discrete parameters, which in turn did not allow them to construct a decision support subsystem. In developing of new systems of technical diagnostics it was proposed to use the principle of centralized distributed processing of diagnostic data, to include a subsystem support decision-making in to the diagnostics system, it will reduce the amount of work to maintain the devices blocking and reduce recovery time after the occurrence injury. Originality. As a result, the currently existing engineering controls facilities of automatic block can not provide a full assessment of the state distillation alarms and locks. Criteria for the development of new systems of technical diagnostics with increasing amounts of diagnostic information and its automatic analysis were proposed. Practical value. These results of the analysis can be used in practice in order to select the technical control of automatic block devices, as well as the further development of diagnostic systems automatic block that allows for a gradual transition from a planned preventive maintenance service model to the actual state of the monitored devices.

  1. Rapid detailed characterization of concrete shielding blocks utilizing internal natural radionuclides for calibration

    International Nuclear Information System (INIS)

    McDonald, R.J.; Smith, A.R.; Hurley, D.L.; Norman, E.B.; Schoonover, M.R.

    1998-01-01

    Following many years of productive research, the 184-inch Cyclotron, the SuperHILAC, and the BEVALAC accelerators at the Berkeley Laboratory were closed, leaving thousands of concrete shielding blocks available for reuse, recycling, or disposal. The process history of these blocks precludes free release pending radiological characterization. This paper describes a procedure whereby a high efficiency shielded germanium spectrometer is used to rapidly characterize natural and man-made activity within the blocks. The spectrometer is moved up to the block and 5 minutes of data are collected at the point on the block that registers highest on a micro-R meter. Sensitivity is better than 1 pCi/g (0.037 Bq/g) for Co-60 and Eu-152, the prominent man-made activities observed. One-time calibration of the detector system is obtained from a sample of concrete, drilled with a hammer drill, counted in our low-background facility, and compared to crushed rock with known U, Th, and K activity. A simple relationship exists between the counts/minute observed in a characteristic gamma-ray peak and the activity in the block. (author)

  2. B-cell waste classification sampling plan

    International Nuclear Information System (INIS)

    HOBART, R.L.

    1999-01-01

    This report documents the methods used to collect samples and analyze data necessary to verify and/or determine the radionuclide content of the 324 Facility B-Cell decontamination and decommissioning waste stream

  3. Independent verification of monitor unit calculation for radiation treatment planning system.

    Science.gov (United States)

    Chen, Li; Chen, Li-Xin; Huang, Shao-Min; Sun, Wen-Zhao; Sun, Hong-Qiang; Deng, Xiao-Wu

    2010-02-01

    To ensure the accuracy of dose calculation for radiation treatment plans is an important part of quality assurance (QA) procedures for radiotherapy. This study evaluated the Monitor Units (MU) calculation accuracy of a third-party QA software and a 3-dimensional treatment planning system (3D TPS), to investigate the feasibility and reliability of independent verification for radiation treatment planning. Test plans in a homogenous phantom were designed with 3-D TPS, according to the International Atomic Energy Agency (IAEA) Technical Report No. 430, including open, blocked, wedge, and multileaf collimator (MLC) fields. Test plans were delivered and measured in the phantom. The delivered doses were input to the QA software and the independent calculated MUs were compared with delivery. All test plans were verified with independent calculation and phantom measurements separately, and the differences of the two kinds of verification were then compared. The deviation of the independent calculation to the measurements was (0.1 +/- 0.9)%, the biggest difference fell onto the plans that used block and wedge fields (2.0%). The mean MU difference between the TPS and the QA software was (0.6 +/- 1.0)%, ranging from -0.8% to 2.8%. The deviation in dose of the TPS calculation compared to the measurements was (-0.2 +/- 1.7)%, ranging from -3.9% to 2.9%. MU accuracy of the third-party QA software is clinically acceptable. Similar results were achieved with the independent calculations and the phantom measurements for all test plans. The tested independent calculation software can be used as an efficient tool for TPS plan verification.

  4. Do different funding mechanisms produce different results? The implications of family planning for fiscal federalism.

    Science.gov (United States)

    McFarlane, D R; Meier, K J

    1998-06-01

    The 104th Congress considered massive structural changes in federal aid to the states. Not only would federal categorical grants be consolidated into block grants, but entitlement programs would be converted to block grants too. Using family planning as a case study, this article examines whether program impacts change if different grant mechanisms are employed. Findings from a pooled time series analysis of state family planning expenditures show that categorical funding (here, title X of the Public Health Service Act) is the most cost effective in producing desired outcomes, such as lowering infant mortality. Policies using entitlement grants are generally more cost effective than those that rely upon block grants. We discuss the implications of these findings for health policy more broadly and for fiscal federalism in general.

  5. Coastal protection using topological interlocking blocks

    Science.gov (United States)

    Pasternak, Elena; Dyskin, Arcady; Pattiaratchi, Charitha; Pelinovsky, Efim

    2013-04-01

    The coastal protection systems mainly rely on the self-weight of armour blocks to ensure its stability. We propose a system of interlocking armour blocks, which form plate-shape assemblies. The shape and the position of the blocks are chosen in such a way as to impose kinematic constraints that prevent the blocks from being removed from the assembly. The topological interlocking shapes include simple convex blocks such as platonic solids, the most practical being tetrahedra, cubes and octahedra. Another class of topological interlocking blocks is so-called osteomorphic blocks, which form plate-like assemblies tolerant to random block removal (almost 25% of blocks need to be removed for the assembly to loose integrity). Both classes require peripheral constraint, which can be provided either by the weight of the blocks or post-tensioned internal cables. The interlocking assemblies provide increased stability because lifting one block involves lifting (and bending) the whole assembly. We model the effect of interlocking by introducing an equivalent additional self-weight of the armour blocks. This additional self-weight is proportional to the critical pressure needed to cause bending of the interlocking assembly when it loses stability. Using beam approximation we find an equivalent stability coefficient for interlocking. It is found to be greater than the stability coefficient of a structure with similar blocks without interlocking. In the case when the peripheral constraint is provided by the weight of the blocks and for the slope angle of 45o, the effective stability coefficient for a structure of 100 blocks is 33% higher than the one for a similar structure without interlocking. Further increase in the stability coefficient can be reached by a specially constructed peripheral constraint system, for instance by using post-tension cables.

  6. Nalbuphine as an adjuvant to 0.25% levobupivacaine in ultrasound-guided supraclavicular block provided prolonged sensory block and similar motor block durations (RCT).

    Science.gov (United States)

    Abdelhamid, Bassant Mohamed; Omar, Heba

    2018-05-28

    Prolonged postoperative analgesia with early motor recovery for early rehabilitation is a challenge in regional block. The purpose of this study is to evaluate the effect of adding 20 mg nalbuphine to 25 ml of 0.25% levobupivacaine in supraclavicular brachial plexus block. One hundred thirty-five (135) patients scheduled for hand and forearm surgeries with supraclavicular block were randomly allocated into three equal groups. Group L received 25 ml of 0.5% levobupivacaine + 1 ml normal saline; group H received 25 ml of 0.25% levobupivacaine + 1 ml normal saline; and group N received 25 ml of 0.25% levobupivacaine + 1 ml (20 mg) nalbuphine. Onset time and duration of sensory and motor block, and time to first analgesic dose were recorded. Sensory block onset was comparable between the three groups. Motor block onset in group L and group N was comparable (13.16 ± 3.07 and 13.84 ± 3.05 min, respectively) and was shorter than that in group H (15.71 ± 2 0.91 min). Sensory block duration in group L and group N was comparable (522.22 ± 69.57 and 533.78 ± 66.03 min, respectively) and was longer than that in group H (342.67 ± 92.80 min). Motor block duration in group N and group H was comparable (272.00 ± 59.45 and 249.78 ± 66.01 min, respectively) and was shorter than that in group L (334.67 ± 57.90 min). Time to first analgesic dose was significantly longer in group N (649.78 ± 114.76 min) than that of group L and group H (575.56 ± 96.85 and 375.56 ± 84.49 min, respectively) and longer in group L when compared to group H. Adding 20 mg nalbuphine to 25 ml of 0.25% levobupivacaine in supraclavicular block provided prolonged duration of sensory block with similar duration of motor block.

  7. Depigmented Allergoids Reveal New Epitopes with Capacity to Induce IgG Blocking Antibodies

    OpenAIRE

    L?pez-Matas, M. Angeles; Gallego, Mayte; Iraola, V?ctor; Robinson, Douglas; Carn?s, Jer?nimo

    2013-01-01

    Background. The synthesis of allergen-specific blocking IgGs that interact with IgE after allergen immunotherapy (SIT) has been related to clinical efficacy. The objectives were to investigate the epitope specificity of IgG-antibodies induced by depigmented-polymerized (Dpg-Pol) allergoids and unmodified allergen extracts, and examine IgE-blocking activity of induced IgG-antibodies. Methods. Rabbits were immunized with native and Dpg-Pol extracts of birch pollen, and serum samples were obtain...

  8. Arterial and venous plasma levels of bupivacaine following epidural and intercostal nerve blocks.

    Science.gov (United States)

    Moore, D C; Mather, L E; Bridenbaugh, P O; Bridenbaugh, L D; Balfour, R I; Lysons, D F; Horton, W G

    1976-07-01

    Arterial and peripheral venous plasma levels of bupivacaine were determined in 30 patients following epidural anesthesia using 150 and 225 mg, as well as following intercostal nerve block with 400 mg. Arterial levels were consistently higher than levels in simultaneously sampled venous blood, and the highest levels occurred with bilateral intercostal nerve block. No evidence of systemic toxicity was observed. The results suggest that bupivacaine may have a wider margin of safety in man than is now stated.

  9. Protection of polyphenols in blueberry juice by vacuum-assisted block freeze concentration.

    Science.gov (United States)

    Orellana-Palma, Patricio; Petzold, Guillermo; Pierre, Lissage; Pensaben, José Manuel

    2017-11-01

    Block freeze concentration allows produces high-quality cryoconcentrates with important protection of valuable components from fresh fruit juices. The aim of this study was to investigate the use of vacuum-assisted block freeze concentration under different experimental conditions to protect polyphenols in the elaboration of concentrated blueberry juice. Fresh blueberry juice was radial or unidirectional frozen at -20 and -80 °C for 12 h and vacuum process was performed at 80 kPa during 120 min. Results showed a significant solute increased in the concentrated fraction in all treatments, and the best treatment was - 20 °C/unidirectional with a value of ≈63 °Brix, equivalent to an increase of 3.8 times in the total polyphenol content (76% of retention). The color of concentrated samples was darker than the initial sample, with ΔE* values of >25 CIELab units in all treatments. The vacuum-assisted block freeze concentrations was an effective technology for protecting polyphenols and obtain a concentrated with a higher concentration of solids from blueberry juice, as well as interesting values of process parameters. Copyright © 2017 Elsevier Ltd. All rights reserved.

  10. Imaging of block copolymer vesicles in solvated state by wet scanning transmission electron microscopy

    Czech Academy of Sciences Publication Activity Database

    Šlouf, Miroslav; Lapčíková, Monika; Štěpánek, M.

    2011-01-01

    Roč. 47, č. 6 (2011), s. 1273-1278 ISSN 0014-3057 R&D Projects: GA ČR GAP208/10/0353; GA AV ČR KAN200520704; GA AV ČR IAA400500703 Institutional research plan: CEZ:AV0Z40500505 Keywords : environmental scanning electron microscopy * self-assembly * amphiphilic block copolymers Subject RIV: CD - Macromolecular Chemistry Impact factor: 2.739, year: 2011

  11. On the interaction of the morphological structure and the LC behaviour of LC side chain block copolymers

    NARCIS (Netherlands)

    Fischer, H.R.; Arnold, M.

    1995-01-01

    The interaction between morphological structure and phase behaviour of a group of LC side group block copolymers have been investigated using DSC, TEM and small angle X-ray diffraction. Generally, phase separation between the two blocks was observed. It was found that in the case of those samples,

  12. SU-F-T-413: Calculation Accuracy of AAA and Acuros Using Cerrobend Blocks for TBI at 400cm

    International Nuclear Information System (INIS)

    Lamichhane, N; Studenski, M

    2016-01-01

    Purpose: It is essential to assess the lung dose during TBI to reduce toxicity. Here we characterize the accuracy of the AAA and Acuros algorithms when using cerrobend lung shielding blocks at an extended distance for TBI. Methods: We positioned a 30×30×30 cm3 solid water slab phantom at 400 cm SSD and measured PDDs (Exradin A12 and PTW parallel plate ion chambers). A 2 cm thick, 10×10 cm2 cerrobend block was hung 2 cm in front of the phantom. This geometry was reproduced in the planning system for both AAA and Acuros. In AAA, the mass density of the cerrobend block was forced to 9.38 g/cm3 and in Acuros it was forced to 8.0 g/cm3 (limited to selecting stainless steel). Three different relative electron densities (RED) were tested for each algorithm; 4.97, 6.97, and 8.97. Results: PDDs from both Acuros and AAA underestimated the delivered dose. AAA calculated that depth dose was higher for RED of 4.97 as compared to 6.97 and 8.97 but still lower than measured. There was no change in the percent depth dose with changing relative electron densities for Acuros. Conclusion: Care should be taken before using AAA or Acuros with cerrobend blocks as the planning system underestimates dose. Acuros limits the ability to modify RED when compared to AAA.

  13. SU-F-T-413: Calculation Accuracy of AAA and Acuros Using Cerrobend Blocks for TBI at 400cm

    Energy Technology Data Exchange (ETDEWEB)

    Lamichhane, N; Studenski, M [University of Miami, Miami, FL (United States)

    2016-06-15

    Purpose: It is essential to assess the lung dose during TBI to reduce toxicity. Here we characterize the accuracy of the AAA and Acuros algorithms when using cerrobend lung shielding blocks at an extended distance for TBI. Methods: We positioned a 30×30×30 cm3 solid water slab phantom at 400 cm SSD and measured PDDs (Exradin A12 and PTW parallel plate ion chambers). A 2 cm thick, 10×10 cm2 cerrobend block was hung 2 cm in front of the phantom. This geometry was reproduced in the planning system for both AAA and Acuros. In AAA, the mass density of the cerrobend block was forced to 9.38 g/cm3 and in Acuros it was forced to 8.0 g/cm3 (limited to selecting stainless steel). Three different relative electron densities (RED) were tested for each algorithm; 4.97, 6.97, and 8.97. Results: PDDs from both Acuros and AAA underestimated the delivered dose. AAA calculated that depth dose was higher for RED of 4.97 as compared to 6.97 and 8.97 but still lower than measured. There was no change in the percent depth dose with changing relative electron densities for Acuros. Conclusion: Care should be taken before using AAA or Acuros with cerrobend blocks as the planning system underestimates dose. Acuros limits the ability to modify RED when compared to AAA.

  14. Evacuation planning for Lilco's Shoreham plant

    International Nuclear Information System (INIS)

    Zorpette, G.

    1987-01-01

    This article reports that the Shoreham Nuclear Power Station, an 820-megawatt boiling-water reactor built by the Long Island Lighting Co., has taken 19 years to build and has so far cost nearly $5 billion. Because no emergency plan for coping with a major accident has been approved by the U.S. Nuclear Regulatory Commission, the plant has not been issued a Federal license to operate at full power. The cause of this impasse is the refusal of New York State and Suffolk County to participate in any emergency plan, on the ground that the geography of Long Island would make such a plan impossible to execute. The regulatory commission's rules require the operator of a nuclear plant to enlist cooperation from state and local authorities in an emergency plan. Shoreham's supporters charge that state and county are exploiting that requirement to block operation of the politically unpopular plant

  15. Geologic and petrophysic analysis of a travertine block as hydrocarbon reservoir analogue

    International Nuclear Information System (INIS)

    Basso, Mateus; Kuroda, Michelle Chaves; Vidal, Alexandre Campane

    2017-01-01

    Microbialitic limestones are gaining space in petroleum geology due to the existence of many reservoirs composed of these lithologies in the pre-salt producing fields. Travertine, calcareous tufa and stromatolites figure among the rocks proposed as analogous for the microbialitic rocks. This work conduces the study of geological, petrophysical and geophysical parameters of a travertine block measuring 1,60 x 1,60 x 2,70 m, weighing 21,2 tons and available in the Centro de Estudo do Petroleo (CEPETRO) at the Universidade Estadual de Campinas. The Italian block, named T-block, corresponds to the representative elementary volume of its original formation and allows the study in an intermediate scale between the hand sample and the outcrop scale. Permeability tests and gamma ray spectrometry measurements were conducted and the porosity was calculated by image analysis. Models were generated from the obtained data and then associated with descriptive geology of the block. A reduction in permeability, porosity and concentration of elements potassium (K), uranium (U) and thorium (Th) was recorded, following a gradient towards the top of the T-block accompanying the reduction in the degree of development of the rock fabric. (author)

  16. High priority tank sampling and analysis report

    International Nuclear Information System (INIS)

    Brown, T.M.

    1998-01-01

    In July 1993, the Defense Nuclear Facilities Board issued Recommendation 93-5 (Conway 1993) which noted that there was insufficient tank waste technical information and the pace to obtain it was too slow to ensure that Hanford Site wastes could be safely stored, that associated operations could be conducted safely, and that future disposal data requirements could be met. In response, the US Department of Energy, in May 1996, issued Revision 1 of the Recommendation 93-5 Implementation Plan (DOE-RL 1996). The Implementation Plan presented a modified approach to achieve the original plan's objectives, concentrating on actions necessary to ensure that wastes can be safely stored, that operations can be safely conducted, and that timely characterization information for the tank waste Disposal Program could be obtained. The Implementation Plan proposed 28 High Priority tanks for near term core sampling and analysis, which along with sampling and analysis of other non-High Priority tanks, could provide the scientific and technical data to confirm assumptions, calibrate models, and.measure safety related phenomenology of the waste. When the analysis results of the High Priority and other-tank sampling were reviewed, it was expected that a series of 12 questions, 9 related to safety issues and 3 related to planning for the disposal process, should be answered allowing key decisions to be made. This report discusses the execution of the Implementation Plan and the results achieved in addressing the questions. Through sampling and analysis, all nine safety related questions have been answered and extensive data for the three disposal planning related questions have been collected, allowing for key decision making. Many more tanks than the original 28 High Priority tanks identified in the Implementation Plan were sampled and analyzed. Twenty-one High Priority tanks and 85 other tanks were core sampled and used to address the questions. Thirty-eight additional tanks were auger

  17. Approximate design theory for a simple block design with random block effects

    OpenAIRE

    Christof, Karin

    1985-01-01

    Approximate design theory for a simple block design with random block effects / K. Christof ; F. Pukelsheim. - In: Linear statistical inference / ed. by T. Calinski ... - Berlin u. a. : Springer, 1985. - S. 20-28. - (Lecture notes in statistics ; 35)

  18. Approach for planning and operation of energy-efficient production systems; Vorgehensweise fuer Planung und Betrieb energieeffizienter Produktionssysteme

    Energy Technology Data Exchange (ETDEWEB)

    Weinert, Nils

    2010-07-02

    The integration of energy efficiency criteria into planning and operating of production systems substantially contributes to resource productivity and thus is an essential prerequisite for global sustainable development. Great potential can be identified for an early consideration of energy efficiency measures in an early planning phase. It is necessary to determine energy requirements during the planning process before the system is implemented. The objective of this thesis is the development of a planning system for the detailed prognosis of a production system's energy consumption. A concept is derived, by which a time based prediction of the amount of energy required by each machine and thus by the whole production system becomes possible. The planning system is methodologically integrated with well established approaches for manufacturing and factory planning. The methodology is based on the separation of production processes into segments, each with specific energy consumption. These segments, which are defined for equipment according to the possible operational states, are called EnergyBlocks. Each EnergyBlock describes the energy consumed and has a fixed or variable duration. A fixed duration results from operational states which last the shortest time technically possible, for example a machine start process. Variable durations represent operational states, whose length are dependant of the production task. Examples are manufacturing processes. The energy consumption of one block is mathematically described using power series. The energy consumption profile of a planned, not yet realized production process is modeled by arranging the EnergyBlocks to sequences. Depending on when the developed planning system is applied in the process of manufacturing and factory planning, energy consumption prognosis can be calculated as a power profile or as total consumption values, using the same model for both cases. Thus, the information density can be chosen

  19. An MILP approach to shelf life integrated planning and scheduling in scalded sausage production

    DEFF Research Database (Denmark)

    Günther, H.O.; van Beek, P.; Grunow, Martin

    2006-01-01

    in which shelf life aspects are integrated into operational production planning and scheduling functions. Specifically we make use of so-called Mixed Integer Linear Programming (MILP) models. Our research is based on an industrial case study of yogurt production. Relying on the principle of block planning...

  20. Solving block linear systems with low-rank off-diagonal blocks is easily parallelizable

    Energy Technology Data Exchange (ETDEWEB)

    Menkov, V. [Indiana Univ., Bloomington, IN (United States)

    1996-12-31

    An easily and efficiently parallelizable direct method is given for solving a block linear system Bx = y, where B = D + Q is the sum of a non-singular block diagonal matrix D and a matrix Q with low-rank blocks. This implicitly defines a new preconditioning method with an operation count close to the cost of calculating a matrix-vector product Qw for some w, plus at most twice the cost of calculating Qw for some w. When implemented on a parallel machine the processor utilization can be as good as that of those operations. Order estimates are given for the general case, and an implementation is compared to block SSOR preconditioning.

  1. Rolling block mazes are PSPACE-complete

    NARCIS (Netherlands)

    Buchin, K.; Buchin, M.

    2012-01-01

    In a rolling block maze, one or more blocks lie on a rectangular board with square cells. In most mazes, the blocks have size k × m × n where k, m, n are integers that determine the size of the block in terms of units of the size of the board cells. The task of a rolling block maze is to roll a

  2. A PMT-Block test bench

    International Nuclear Information System (INIS)

    Adragna, P.; Antonaki, A.

    2006-01-01

    The front-end electronics of the ATLAS hadronic calorimeter (Tile Cal) is housed in a unit, called PMT-Block. The PMT-Block is a compact instrument comprising a light mixer, a PMT together with its divider and a 3-in-1 card, which provides shaping, amplification and integration for the signals. This instrument needs to be qualified before being assembled on the detector. A PMT-Block test bench has been developed for this purpose. This test bench is a system which allows fast, albeit accurate enough, measurements of the main properties of a complete PMT-Block. The system, both hardware and software, and the protocol used for the PMT-Blocks characterization are described in detail in this report. The results obtained in the test of about 10 000 PMT-Blocks needed for the instrumentation of the ATLAS (LHC-CERN) hadronic Tile Calorimeter are also reported

  3. A PMT-Block test bench

    Energy Technology Data Exchange (ETDEWEB)

    Adragna, P [Dipartimento di Fisica ' E.Fermi' , Universita di Pisa and Istituto Nazionale di Fisica Nucleare, Sezione di Pisa, Largo B. Pontecorvo 3, Pisa 56127 (Italy); Universita degli studi di Siena, via Roma 56, 53100 Siena (Italy); Antonaki, A [Institute of Accelerating Systems and Applications, P.O. Box 17214, Athens 10024 (Greece); National Capodistrian University of Athens, 30 Panepistimiou st., Athens 10679 (Greece)] (and others)

    2006-08-01

    The front-end electronics of the ATLAS hadronic calorimeter (Tile Cal) is housed in a unit, called PMT-Block. The PMT-Block is a compact instrument comprising a light mixer, a PMT together with its divider and a 3-in-1 card, which provides shaping, amplification and integration for the signals. This instrument needs to be qualified before being assembled on the detector. A PMT-Block test bench has been developed for this purpose. This test bench is a system which allows fast, albeit accurate enough, measurements of the main properties of a complete PMT-Block. The system, both hardware and software, and the protocol used for the PMT-Blocks characterization are described in detail in this report. The results obtained in the test of about 10 000 PMT-Blocks needed for the instrumentation of the ATLAS (LHC-CERN) hadronic Tile Calorimeter are also reported.

  4. Test plan for the Sample Transfer Canister system

    International Nuclear Information System (INIS)

    Flanagan, B.D.

    1998-01-01

    The Sample Transfer Canister will be used by the Waste Receiving and Processing Facility (WRAP) for the transport of small quantity liquid samples that meet the definition of a limited quantity radioactive material, and may also be corrosive and/or flammable. These samples will be packaged and shipped in accordance with the US Department of Transportation (DOT) regulation 49 CFR 173.4, ''Exceptions for small quantities.'' The Sample Transfer Canister is of a ''French Can'' design, intended to be mated with a glove box for loading/unloading. Transport will typically take place north of the Wye Barricade between WRAP and the 222-S Laboratory. The Sample Transfer Canister will be shipped in an insulated ice chest, but the ice chest will not be a part of the small quantity package during prototype testing

  5. Masquerading bundle branch block as a presenting manifestation of complete atrioventricular block that caused syncope.

    Science.gov (United States)

    Jiao, Zhenyu; Tian, Ying; Yang, Xinchun; Liu, Xingpeng

    2017-10-01

    A 59-year-old male patient was admitted with the main complaints of stuffiness and shortness of breath. An ECG from precordial leads on admission showed masquerading bundle branch block. Syncope frequently occurred after admission. During syncope episodes, ECG telemetry showed that the syncope was caused by intermittent complete atrioventricular block, with the longest RR interval lasting for 4.36 s. At the gap of syncope, ECG showed complete right bundle branch block accompanied by alternation of left anterior fascicular block and left posterior fascicular block. The patient was implanted with a dual-chamber permanent pacemaker. Follow-up of 9 months showed no reoccurrence of syncope.

  6. UMAPRM: Uniformly sampling the medial axis

    KAUST Repository

    Yeh, Hsin-Yi Cindy

    2014-05-01

    © 2014 IEEE. Maintaining clearance, or distance from obstacles, is a vital component of successful motion planning algorithms. Maintaining high clearance often creates safer paths for robots. Contemporary sampling-based planning algorithms That utilize The medial axis, or The set of all points equidistant To Two or more obstacles, produce higher clearance paths. However, They are biased heavily Toward certain portions of The medial axis, sometimes ignoring parts critical To planning, e.g., specific Types of narrow passages. We introduce Uniform Medial Axis Probabilistic RoadMap (UMAPRM), a novel planning variant That generates samples uniformly on The medial axis of The free portion of Cspace. We Theoretically analyze The distribution generated by UMAPRM and show its uniformity. Our results show That UMAPRM\\'s distribution of samples along The medial axis is not only uniform but also preferable To other medial axis samplers in certain planning problems. We demonstrate That UMAPRM has negligible computational overhead over other sampling Techniques and can solve problems The others could not, e.g., a bug Trap. Finally, we demonstrate UMAPRM successfully generates higher clearance paths in The examples.

  7. Backfilling of deposition tunnels, block alternative

    International Nuclear Information System (INIS)

    Keto, P.; Roennqvist, P.-E.

    2007-03-01

    This report presents a preliminary process description of backfilling the deposition tunnels with pre-compacted blocks consisting of a mixture of bentonite and ballast (30:70). The process was modified for the Finnish KBS-3V type repository assuming that the amount of spent fuel canisters disposed of yearly is 40. Backfilling blocks (400 x 300 x 300 mm) are prepared in a block production plant with a hydraulic press with an estimated production capacity of 840 blocks per day. Some of the blocks are modified further to fit the profile of the tunnel roof. Prior to the installation of the blocks, the deposition tunnel floor is levelled with a mixture of bentonite and ballast (15:85). The blocks are placed in the tunnel with a modified reach truck. Centrifugal pellet throwing equipment is used to fill the gap between the blocks and the rock surface with bentonite pellets. Based on a preliminary assessment, the average dry density achieved with block backfill is sufficient to fulfil the criteria set for the backfill in order to ensure long-term safety and radiation protection. However, there are uncertainties concerning saturation, homogenisation, erosion, piping and self-healing of the block backfill that need to be studied further with laboratory and field tests. In addition, development efforts and testing concerning block manufacturing and installation are required to verify the technical feasibility of the concept. (orig.)

  8. SU-F-T-604: Dosimetric Evaluation of Intracranial Stereotactic Radiotherapy Plans On a LINAC

    Energy Technology Data Exchange (ETDEWEB)

    Sheth, N; Tabibian, A; Rose, J; Alvelo, M; Perel, C; Laiken, K; Kim, A [Bayonne Medical Center, Bayonne, NJ (United States)

    2016-06-15

    Purpose: To evaluate the dosimetry of cranial stereotactic radiotherapy (SRT) plans of varying techniques on linac that meets appropriate TG-142 tolerances using 1 cm leaf width multileaf collimator (MLC). Methods: Seventeen spherical targets were generated in the center of a head phantom with diameters ranging 8 mm to 40 mm. SRT plans used 100° non-coplanar arcs and 5 couch angles with 35° spacing. The field size was target plus 1 mm margin. Four plans were created for each target: symmetrical jaws blocking for 5 arcs with 0° collimator (J1C), symmetrical jaws blocking with 5 clockwise arcs with 0° collimator and 5 counter-clockwise arcs with 45° collimator (J2C), MLC blocking for 5 dynamic conformal arcs with 0° collimator (M1C), and MLC blocking for 5 clockwise dynamic conformal arcs with 0° collimators and 5 counter-clockwise dynamic conformal arcs with 45° collimator (M2C).Conformity was evaluated using a ratio of Rx to target volume (PITV). Heterogeneity was determined using a ratio of maximum dose to Rx dose. Falloff was scored using CGIg: difference of effective radii of spheres equal to half and full Rx volumes. Results: All plans met RTOG SRS criteria for conformity and heterogeneity. The mean PITV was 1.52±0.07, 1.49±0.08, 1.39±0.05, and 1.37±0.04 for J1C, J2C, M1C, and M2C plans respectively. The mean CGIg was 75.35±15.79, 74.19±16.66, 77.14±15.12, and 76.28±15.78 for J1C, J2C, M1C, and M2C plans respectively. The mean MDPD was 1.25±0.00 for all techniques. Conclusion: Clinically acceptable SRT plans for spherical targets were created on a linac with 1 cm MLC. Adding two collimator angles and MLC to arcs each improved conformity. The MLC improved the dose falloff while two collimator angles degraded it. This technique can expand the availability of SRT to patients especially to those who cannot travel to a facility with a dedicated stereotactic radiosurgery machine.

  9. SU-F-T-604: Dosimetric Evaluation of Intracranial Stereotactic Radiotherapy Plans On a LINAC

    International Nuclear Information System (INIS)

    Sheth, N; Tabibian, A; Rose, J; Alvelo, M; Perel, C; Laiken, K; Kim, A

    2016-01-01

    Purpose: To evaluate the dosimetry of cranial stereotactic radiotherapy (SRT) plans of varying techniques on linac that meets appropriate TG-142 tolerances using 1 cm leaf width multileaf collimator (MLC). Methods: Seventeen spherical targets were generated in the center of a head phantom with diameters ranging 8 mm to 40 mm. SRT plans used 100° non-coplanar arcs and 5 couch angles with 35° spacing. The field size was target plus 1 mm margin. Four plans were created for each target: symmetrical jaws blocking for 5 arcs with 0° collimator (J1C), symmetrical jaws blocking with 5 clockwise arcs with 0° collimator and 5 counter-clockwise arcs with 45° collimator (J2C), MLC blocking for 5 dynamic conformal arcs with 0° collimator (M1C), and MLC blocking for 5 clockwise dynamic conformal arcs with 0° collimators and 5 counter-clockwise dynamic conformal arcs with 45° collimator (M2C).Conformity was evaluated using a ratio of Rx to target volume (PITV). Heterogeneity was determined using a ratio of maximum dose to Rx dose. Falloff was scored using CGIg: difference of effective radii of spheres equal to half and full Rx volumes. Results: All plans met RTOG SRS criteria for conformity and heterogeneity. The mean PITV was 1.52±0.07, 1.49±0.08, 1.39±0.05, and 1.37±0.04 for J1C, J2C, M1C, and M2C plans respectively. The mean CGIg was 75.35±15.79, 74.19±16.66, 77.14±15.12, and 76.28±15.78 for J1C, J2C, M1C, and M2C plans respectively. The mean MDPD was 1.25±0.00 for all techniques. Conclusion: Clinically acceptable SRT plans for spherical targets were created on a linac with 1 cm MLC. Adding two collimator angles and MLC to arcs each improved conformity. The MLC improved the dose falloff while two collimator angles degraded it. This technique can expand the availability of SRT to patients especially to those who cannot travel to a facility with a dedicated stereotactic radiosurgery machine.

  10. The impact of sample size and marker selection on the study of haplotype structures

    Directory of Open Access Journals (Sweden)

    Sun Xiao

    2004-03-01

    Full Text Available Abstract Several studies of haplotype structures in the human genome in various populations have found that the human chromosomes are structured such that each chromosome can be divided into many blocks, within which there is limited haplotype diversity. In addition, only a few genetic markers in a putative block are needed to capture most of the diversity within a block. There has been no systematic empirical study of the effects of sample size and marker set on the identified block structures and representative marker sets, however. The purpose of this study was to conduct a detailed empirical study to examine such impacts. Towards this goal, we have analysed three representative autosomal regions from a large genome-wide study of haplotypes with samples consisting of African-Americans and samples consisting of Japanese and Chinese individuals. For both populations, we have found that the sample size and marker set have significant impact on the number of blocks and the total number of representative markers identified. The marker set in particular has very strong impacts, and our results indicate that the marker density in the original datasets may not be adequate to allow a meaningful characterisation of haplotype structures. In general, we conclude that we need a relatively large sample size and a very dense marker panel in the study of haplotype structures in human populations.

  11. Emplacement of small and large buffer blocks

    International Nuclear Information System (INIS)

    Saari, H.; Nikula, M.; Suikki, M.

    2010-05-01

    The report describes emplacement of a buffer structure encircling a spent fuel canister to be deposited in a vertical hole. The report deals with installability of various size blocks and with an emplacement gear, as well as evaluates the achieved quality of emplacement and the time needed for installing the buffer. Two block assembly of unequal size were chosen for examination. A first option involved small blocks, the use of which resulted in a buffer structure consisting of small sector blocks 200 mm in height. A second option involved large blocks, resulting in a buffer structure which consists of eight blocks. In these tests, the material chosen for both block options was concrete instead of bentonite. The emplacement test was a three-phase process. A first phase included stacking a two meter high buffer structure with small blocks for ensuring the operation of test equipment and blocks. A second phase included installing buffer structures with both block options to a height matching that of a canister-encircling cylindrical component. A third phase included testing also the installability of blocks to be placed above the canister by using small blocks. In emplacement tests, special attention was paid to the installability of blocks as well as to the time required for emplacement. Lifters for both blocks worked well. Due to the mass to be lifted, the lifter for large blocks had a more heavy-duty frame structure (and other lifting gear). The employed lifters were suspended in the tests on a single steel wire rope. Stacking was managed with both block sizes at adequate precision and stacked-up towers were steady. The stacking of large blocks was considerably faster. Therefore it is probably that the overall handling of the large blocks will be more convenient at a final disposal site. From the standpoint of reliability in lifting, the small blocks were safer to install above the canister. In large blocks, there are strict shape-related requirements which are

  12. Sampling pig farms at the abattoir in a cross-sectional study − Evaluation of a sampling method

    DEFF Research Database (Denmark)

    Birkegård, Anna Camilla; Hisham Beshara Halasa, Tariq; Toft, Nils

    2017-01-01

    slaughter pigs. It was not possible to visit farms within the designated timeframe. Therefore, it was decided to use convenience sampling at the abattoir. Our approach was carried out in three steps: 1) planning: using data from meat inspection to plan at which abattoirs and how many farms to sample; 2......A cross-sectional study design is relatively inexpensive, fast and easy to conduct when compared to other study designs. Careful planning is essential to obtaining a representative sample of the population, and the recommended approach is to use simple random sampling from an exhaustive list...... of units in the target population. This approach is rarely feasible in practice, and other sampling procedures must often be adopted. For example, when slaughter pigs are the target population, sampling the pigs on the slaughter line may be an alternative to on-site sampling at a list of farms. However...

  13. Multispectral data compression through transform coding and block quantization

    Science.gov (United States)

    Ready, P. J.; Wintz, P. A.

    1972-01-01

    Transform coding and block quantization techniques are applied to multispectral aircraft scanner data, and digitized satellite imagery. The multispectral source is defined and an appropriate mathematical model proposed. The Karhunen-Loeve, Fourier, and Hadamard encoders are considered and are compared to the rate distortion function for the equivalent Gaussian source and to the performance of the single sample PCM encoder.

  14. Comparative study between ultrasound guided tap block and paravertebral block in upper abdominal surgeries. Randomized controlled trial

    Directory of Open Access Journals (Sweden)

    Ruqaya M. Elsayed

    2017-01-01

    Conclusion: We concluded that ultrasound guided transversus abdominis plane block and thoracic paravertebral block were safe and effective anesthetic technique for upper abdominal surgery with longer and potent postoperative analgesia in thoracic paravertebral block than transversus abdominis block.

  15. Surface water sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of various water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants.

  16. Surface water sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-06-01

    This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of various water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants

  17. Mechanical properties of millet husk ash bitumen stabilized soil block

    African Journals Online (AJOL)

    This study presents an investigation into the improvement of strength and durability properties of lateritic soil blocks using Millet Husk Ash (MHA) and Bitumen as additives so as to reduce its high cost and find alternative disposal method for agricultural waste. The lateritic soil samples were selected and treated with 0%, ...

  18. Single-step brazing process for mono-block joints and mechanical testing

    Energy Technology Data Exchange (ETDEWEB)

    Casalegno, V.; Ferraris, M.; Salvo, M.; Rizzo, S. [Politecnico di Torino, Materials Science and Chemical Engineering Dept., Torino (Italy); Merola, M. [ITER International Team, llER Joint Work Site, Cadarache, 13 - St Paul Lez Durance (France)

    2007-07-01

    -active brazing alloy. On the joined samples were carried out morphological investigations and 'ad hoc' mechanical characterization techniques were set up, since mechanical resistance of mono-block samples can't easily be measured by usual mechanical tests. (authors)

  19. Single-step brazing process for mono-block joints and mechanical testing

    International Nuclear Information System (INIS)

    Casalegno, V.; Ferraris, M.; Salvo, M.; Rizzo, S.; Merola, M.

    2007-01-01

    alloy. On the joined samples were carried out morphological investigations and 'ad hoc' mechanical characterization techniques were set up, since mechanical resistance of mono-block samples can't easily be measured by usual mechanical tests. (authors)

  20. Seeps and springs sampling and analysis plant for the Environmental Monitoring Plan at Waste Area Grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the U.S. Department of Energy and operated by Lockheed Martin Energy System, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources.